Loading...
HomeMy WebLinkAboutCT 06-06; LA COSTA OAKS NORTH NEIGHBORHOOD 3.7; BMP VERIFICATION; 2010-07-07ALEG RETENVI RON MENTAL Protecting the Environment for Future Génerátions CITY OF Carlsbad 5950 El Camino Real Carlsbad, CA 92008 BMP Verification of Installation Required Prior to Occupancy June 7, 2010 Property Address: La Costa Oaks 3.7 North - Phase 4 Lots 14 -22 Responsible Party and/or Property Owner: Colrich Communities To verify Treatment Control BMPs are installed prior to occupancy of lots 14 - 22 at The La Costa Oaks 3.7 North residential project developed by Colrich Communities, the following is a list of Treatment Control BMPs and frequency of maintenance of the TCB's that are installed on the project at this time of verification. Treatment Control BMP Maintenance Frequency 1. MP-51 Vortex Seperator Minimum Once a Year Whe maintenance of the Treatment Control BMP's after Colrich Communities has completed the project will be turned over to Home Owners Association. The Home Owners Association has contracted Walters Management Company to maintain the Treatment Control BMP's after the completion of the project. Contact information for Walters Management Company is listed below: 6+ Contact: Gene Salvia or Engrid Barton Phone Number: 760-431-2522 Active construction BMPs in the active phases are being maintained by The Land Stewards erosion control company. Inspections of the active areas are completed by Alegre Environmental on a routine basis as well as before and after rain events. I, John Gentillon, hereby certify that the above information is correct to the best of my knowledge. Signature Date___________________________ 455 North Twin Oaks Valley Road, San Marcos, CA 92069 Toll Free: (888)794-6255 * Phone: (858)527-1795 * Fax: (858)527-1884 www.alegreenvironmental.com