Loading...
HomeMy WebLinkAboutCT 06-24; BRESSI RANCH VILLAGE CENTER; AS-GRADED REPORT OF POST GRADING; 2009-06-11I I I 1 I I I I I I I I 1 I I I .1 I I I Prepared for: LNR PROPERTY CORPORATION COMMERCIAL PROPERTY GROUP 4275 EXECUTIVE SQUARE, SUITE 210 LA JOLLA, CALIFORNIA 92037 Project No. 971009-051 June 11, 2009 AS-GRADED REPORT OF POST GRADING, BRESSI RANCH VILLAGE CENTER, CARLSBAD, CALIFORNIA Leighton and Associates, Inc. A LEIGHTON GROUP COMPANY I 1 4 I Leighton andAssociates, Inc. A LEIGHTON GROUP COMPANY 1 June 11, 2009 I Project No. 971009-051 I To: LNR Property Corporation Commercial Property Group 4275 Executive Square, Suite 210 La Jolla, California 92037 I Attention: Mr. Jeff Williams Subject: As-Graded Report of Post Grading, Bressi Ranch Village Center, Carlsbad, 1 California Introduction I In accordance with your request and authorization, Leighton and Associates, Inc. (Leighton) has. provided geotechnical observation and testing services during the post grading operations for I pavement and hardscapè areas as described below at Bressi Ranch Village Center project, located in Carlsbad, California (Figure 1). This report summarizes our geotechnical observations, field and laboratory test results, and the geotechnical conditions encountered during the post grading operations at the site. The purpose of our geotechnical observation and testing services was to document that the post grading operations for the subject site were performed in general accordance with the project geotechnical report (Appendix A), geotechnical recommendations ' made during the course of grading, and the City of Carlsbad requirements. As of the date of this report, the post grading operations relative to activities for the subject areas at The Bressi Ranch Village Center have been completed. Summary of Post Grading Operations I The post grading operations were. performed between March 2008 and January 2009. Post grading operations included: 1) sewer, water, storm drain, joint trench backfill and compaction; 2) I curb, curb & gutter and pavement subgrade processing; 3) pavement aggregate base material and asphalt concrete placement and compaction; and 4) geotechnical footing observations for Major C, and Shops A, B, C, D, E, F and G. I I I 3934 Murphy Canyon Road, Suite B205 • San Diego, CA 921234425 858.292.8030 • Fax 858.292.0771 971009-051 It should be noted that the pavement post grading activities were located northwest and around the Building Pad for Major "A"; north, south, and west of the Building Pad for Major "B"; north and west of the Building Pad for Major "C"; east and south of Pad "A"; east of Pad "B"; south and east of Shop A; north and south of Shops B, C and D; south of Shops F and G;árid north, south, and east-of Shop E. Compaction testing and observation was performed by representatives of our firm who were on- site on an as-needed basis during the post grading operations Specific observation and testing services conducted during the post grading operations are presented below. Trench Backfill Underground utilities (including sewer, water, storm drain, and joint trench) were installed during the development of the site. During the trench and backfill operations, native soils arid/or import soils were placed in 4- to 8-inch thick loose lifts, moisture-conditioned prior to fill placement, and compacted to a minimum 90 percent relative compaction (based on ASTM Test Method D1557).. Compaction of the trench backfill soils was accomplished by hand tampers, sheepsfoot roller, and/or wheel-rolling with heavy-duty construction equipment. The results and description of approximate location of the backfill tests are summarized in Appendix B. Structural Pavement Sections I. Prior to placement of the aggregate base material, parking and driveway pavement subgrade soils were processed (i.e. scarified to a minimum depth of 12 inches, moisture-conditioned to near-optimum moisture content and thoroughly mixed) and then compacted to a minimum of ' 95 percent relative compaction (based on ASTM Test Method D1557) in accordance with the project geotechnical recommendations (Leighton, 2008f). The aggregate base materials were then placed and compacted to a minimum of 95 percent of their respective maximum dry I .densities (based on ASTM Test Method D1557). Asphalt concrete materials placed in the drive and parking areas were placed and compacted to a minimum 95 percent relative compaction (based on batch plant maximum density provided by others). The field density test results for I . - the subgrade soil, aggregate base material; and asphalt concrete testing are summarized in Appendix B. Field and Laboratory Testing - Field density tests were performed during the placement and compaction of trench backfills, I subgrade soil preparation, and aggregate base material and asphalt concrete placement. Density tests were performed in general accordance with the Nuclear-Gauge Method (ASTM Test Methods D2922 and D3017). The results and approximate locations of the fielddensity tests I performed are summarized in Appendix B. The field density testing was performed in general accordance with the applicable ASTM standards, the current standard of care in the industry, and the precision of the testing method itself. Variations in relative compaction should be I expected from the results documented herein. 4 -2- Leighton 971009-051 As indicated in Appendix B, areas in which field density test results were less than the required minimum 90 or 95 relative compaction were reworked, recompacted, and re-tested until the minimum 90 or 95 percent relative compaction was achieved Asphalt concrete was placed and compacted to -a mnimum 95 percent relative compaction based on the maximum densities obtained from. the'AC supplier. Representative samples of the native soil and imported material placed and compacted during the post-grading operations were tested for maximum dry density and optimum moisture content in accordance with ASTM Test Method D1557 The laboratory test results are presented in Appendix C Asphalt concrete testing utilized maximum density values obtained from the AC supplier (and are included in Appehdix C). FOundation Excavation Observation For buildings identified as Major C, and Shops \A,. B, C," D, E, F and G, isolated spread footings and perimeter continuous footings wereexcavated and founded into competent fill soils as recormended in the project geotechrncal report (Leighton, 2007 and 2008a) Obsevatioji' arid/or testing of the footingi excavations and slab subgrade moisture conditioning wereobserved and/or pèrformed'by'representatives of Leighton. Summary of Conclusions The following is a summary of our conclusions based on our site observations and field and laboratory test results: . Geotechnical conditions encountered during the post-grading were generally as anticipated. Based on our observations and testing the post-grading Operations were performed in general accordance with the project geotechmcal recommendations and the City of Carlsbad requirements In our professional opinion, the geotechmcal aspects of the development have been evaluated and properly treated during the potgrading operations. Field density testing indicated that the trench backfill soils within the project were compacted to a minimum 90 percent relative compaction (based on ASTM Test Method D1557) Field density testing also indicated that the pavement subgrade soils and aggregate base matenals were compacted to a minimum 95 percent relative compaction (based on ASTM Test Method D1557). . . Field density testing during the paving. operations indicated that the asphalt concrete was compacted to a minimum 95 percent relative compaction of the maximum AC density provided by the AC.supplier. 4 Leighton 971009-051 I • Foundation excavations for buildings identified as Major C, and Shops A, B, C, D, E, F and G were observed and found to be consistent with design depths and bearing on. compacted fill - soil. Based onour geotechnical observations and testing, it is Our professional opinion (i.e., certifying-as I .defined by the California Business and Professions Code) that the soil engineering and engineering geologic aspects of the grading are in 'general compliance with the approved geotechnical report (Appendix A). I Limitations I The presence of our field representative at the site was intended to provide the owner with professional advice, opinions, and recommendations based, on observations of the contractor's work. Although the observations did not reveal obvious deficiencies or deviations from project I specifications, we. . do not guarantee the contractor's work, nor do our services relieve the contractor or his subcontractor's work, nor do our services relieve the contractor or his subcontractors of their responsibility if defects are subsequently discovered in their work Our I responsibilities did not include any supervision or direction of the actual work procedures of the contractor, his personnel, or subcontractors. The conclusions in this report are based on test results and observations of the grading and earthwork procedures used and represent our I engineering opinion as to the compliance of the results with the project specifications. If you have any questions regarding our report, please do not hesitate to contact this office. We I appreciate this opportunity to be of service. Respectfully submitted. I LEIGI-ITON AND ASSOCIATES, INC. Lu EV. CC_ I .' Wi1hnl CIVIL aD.OlsonRCE45283(9R Associate Engineer NO. 1349 .2 CERTIFIED (p GEOLOGIST Michael R. Stewart, CEG Vice President / Principal Geologist FCAL/ I Attachments: Figure 1 - Site Location Map Appendix A - References Appendix B - Summary of Field Density Tests I Appendix C - Laboratory Testing Procedures and Test Results Distribution: (6) Addressee I I I I I I I I I I I I I I I I I I 'I I 971009-051 I APPENDIX A I . References California Building Standards Commission (CBSC), 2007, California Building Code (CBC). I Carlsbad, City of, 2004, Standards for Design and Construction of Public Works Improvements in the City of Carlsbad, California, Project No. 05332-12-01, dated April 20, 1993, I revised June 2004. Project Design Consultants, 2007, Grading, Drainage and Erosion Control Plans For: Bressi Ranch I . Village Center, Carlsbad, California, Drawing Number 452-9A, 16 Sheets, date received December 12, 2007. I Leighton & Associates, 2007, Geotechnical Preliminary Investigation, Bressi Ranch Village Center, A Portion of Planning Area PA15, Carlsbad, California, Project No. 971009- 047, dated January 25, 2007. U , 2008a, Addendum Geotechnical Recommendations for Structural Foundations and Exterior Concrete Flatwork, Bressi Ranch Village Center, a Portion of Planning Area PA- 15, Carlsbad, California, Project No. 971009-050, dated January 15, 2008. 2008b, Geotechnical As-graded Completion Report of Rough and Fine Grading, I Building Pads for Major "A" through "C", Pad "A", and Shops "A", "B", and "D" through U "G", Bressi Ranch Village Center, Carlsbad, California, Project No. 971009-050, dated March 24, 2008. 2008c, Geotechnical As-graded Completion Report of Rough and Fine Grading, Building Pads for Pad "B" and Shop "C", Bressi Ranch Village Center, Carlsbad, I California, Project No. 971009-050, dated March 2, 2008. 2008d, Pavement Section Design Recommendations for the West Side of the Bressi I Ranch Village Center, Carlsbad, California, Project No. 971009-050, dated March 28, 2008. I , 2008e, Pavement Section Design Recommendations for the East Side of the Bressi Ranch Village Center, Carlsbad, California, Project No. 971009-051, dated May 8, 2008. I , 2008f, Pavement Section Design Recommendations for Bressi Ranch Village Center, Carlsbad, California, Project No. 971009-05 1, dated May 16, 2008. I I I I I I I I I I I I 1 Li I I I I I n H 971009-051 APPENDIX B Explanation of Summary of Field Density Tests I Test No. Test of Test No. Test of Prefix Test of Abbreviations Prefix Test of Abbreviations (none) GRADING Natural Ground NG (SG) SUBGRADE Original Ground OG (AB) AGGREGATE BASE Existing Fill EF (CB) CEMENT TREATED BASE Compacted Fill CF (PB) PROCESSED BASE Slope Face SF (AC) ASPHALT CONCRETE Finish Grade FG C Curb (S) SEWER (SD) STORM DRAIN G Gutter (AD) AREA DRAIN Curb and Gutter CG (W) DOMESTIC WATER Cross Gutter XG (RC) RECLAIMED WATER Street ST (SB) SUBDRA Th4 Sidewalk SW (G) GAS Driveway D (E) ELECTRICAL Driveway Approach DA (T) TELEPHONE Parking Lot P (JT) JOINT UTILITY Electric Box Pad EB (I) IRRIGATION Trash Enclosure . TE Bedding Material B Loading Ramp LR Shading Sand S Main M Lateral L Crossing X Manhole MH Fire Service FS Catch Basin CB Riser R Inlet I (RW) RETAINING WALL (P) PRESATURATION (CW) CRIB WALL (LW) (SF) LOFFELL WALL STRUCT FOOTING Moisture Content M Footing Bottom F Backfill B Wall Cell C (IT) INTERIOR TRENCH Plumbing Backfill P Electrical Backfill E N represents nuclear gauge tests that were performed in general accordance with most recent version of ASTM Test Methods D2922 and D3017. S represents sand cone tests that were performed in general accordance with most recent version of ASTM Test Method D1556. 15A represents first retest of Test No. 15 15B represents second retest of Test No. 15 0' in Test Elevation Column represents test was taken at the ground surface (e.g. finish grade or subgrade) 1" in Test Elevation Column represents test was taken one foot below the ground surface B-i - - - - - - - - - - - - - - - - - - - SUMMARY OF FIELD DENSITY TESTS Test No. Test Date Test Of Location Test Lot # Elev (ft) Soil Type Dry Density Field Max Moisture (%) Field Opt. Relative (%) Compaction Remarks AC 1 6/19/08 ST Nof Major A 0.0 ACI 140.2 146.0 0.0 96 AC 2 6/19/08 ST Nof Major A 0.0 ACI 139.9 146.0 0.0 96 AC 3 6/19/08 ST Nof Major A 0.0 ACI 139.9 146.0 0.0 96 AC 4 6/19/08 ST NWof Major A 0.0 AC! 141.7 146.0 0.0 97 AC 5 6/19/08 ST Wof Major A 0.0 ACI 139.8 146.0 0.0 96 AC 6 6/19/08 ST Wof Major A 0.0 ACI 142.6 146.0 0.0 98 AC 7 6/19/08 ST Wof Major A 0.0 AC! 142.0 146.0 0.0 97 AC 8 6/19/08 ST N of Shop E 0.0 ACI 142.8 146.0 0.0 98 AC 9 6/19/08 ST N of Shop E 0.0 ACI 142.3 146.0 0.0 97 AC 10 6/19/08 ST N of Major B 0.0 AC! 142.6 146.0 0.0 98 AC 11 6/19/08 ST NWof Major B 0.0 AC! 140.2 146.0 0.0 96 AC 12 6/19/08 ST N of Shop D 0.0 ACI 139.9 146.0 0.0 96 AC 13 6/19/08 ST N of Shop D 0.0 AC! 140.8 146.0 0.0 96 AC 14 6/19/08 ST Nof Shop D 0.0 AC! 140.6 146.0 0.0 96 AC 15 6/19/08 ST Nof Shop D 0.0 AC! 141.8 146.0 0.0 97 AC 16 6/19/08 ST Nof Shop D 0.0 AC! 140.5 146.0 0.0 96 AC 17 8/27/08 ST Nof Major A 0.0 ACI 141.8 146.0 0.0 97 AC 18 8/27/08 ST Nof Major A 0.0 AC! 140.3 146.0 0.0 96 AC 19 8/27/08 ST Nof Major A 0.0 ACI 141.2 146.0 0.0 97 AC 20 8/27/08 ST Nof Major A 0.0 AC! 141.8 146.0 0.0 97 AC 21 8/27/08 ST Nof Major A 0.0 AC! 141.6 146.0 0.0 97 AC 22 8/27/08 ST Nof Major A 0.0 ACI 142.7 146.0 0.0 98 AC 23 8/27/08 ST N of Major A 0.0 AC! 140.8 146.0 0.0 96 AC 24 8/27/08 P S of Shop G 0.0 AC! 139.9 146.0 0.0 96 AC 25 8/27/08 P S of Shop G 0.0 AC! 139.0 146.0 0.0 95 AC 26 8/27/08 P S of Shop G 0.0 AC! 139.8 146.0 0.0 96 AC 27 . 8/27/08 P Sof Shop F 0.0 ACI 140.7 146.0 0.0 96 AC 28 8/27/08 P 5 of Shop F 0.0 ACI 142.6 146.0 0.0 98 AC 29 8/27/08 P Sof Shop F 0.0 AC! 139.8 146.0 0.0 96 AC 30 8/27/08 P S of Shop F 0.0 AC! 139.5 146.0 0.0 96 AC 31 8/27/08 p S of Shop F 0.0 AC! 140.4 146.0 0.0 96 AC 32 8/27/08 P 5 of Shop F 0.0 AC! 139.8 146.0 0.0 96 Project Number: 971009-050 0 Project Name: LNR/Bressi Project Location: 0 . ki Client: 0 Page 1 of 8 6/8/20 11:32:04AM - - - - - - - - - - - - - - - - - - - SUMMARY OF FIELD DENSITY TESTS Test Test Test Location Test Soil Dry Density Moisture (%) Relative (%) No. Date Of Lot # Elev (ft) Type Field Max Field Opt. Compaction Remarks AC 33 8/27/08 P S of Shop F 0.0 ACI 139.5 146.0 0.0 96 AC 34 8/27/08 P S of Shop F 0.0 ACI 143.8 146.0 0.0 98 AC 35 8/27/08 P Sof Shop F 0.0 ACI 142.9 146.0 0.0 98 AC 36 8/28/08 P Parking East of Pad B& Shop A 0.0 ACI 140.5 146.0 0.0 96 AC 37 8/28/08 P Parking East of Pad B & Shop A 0.0 ACI 139.9 146.0 0.0 96 AC 38 8/28/08 P Parking East of Pad B & Shop A 0.0 ACI 141.8 146.0 0.0 97 AC 39 8/28/08 P Parking East of Pad B & Shop A 0.0 AC! 140.8 146.0 0.0 96 AC 40 8/28/08 P Parking East of Pad B & Shop A 0.0 ACI 139.7 146.0 0.0 96 AC 41 8/28/08 P Parking East of Pad B & Shop A 0.0 ACI 138.7 146.0 0.0 95 AC 42 8/28/08 P Parking East of Pad B & Shop A 0.0 ACI 138.7 146.0 0.0 95 AC 43 8/28/08 P Parking East of Pad B & Shop A 0.0 ACI 140.3 146.0 0.0 96 AC 44 8/28/08 P Parking East of Shop A 0.0 ACI 139.3 146.0 0.0 95 AC 45 8/28/08 P Parking East of Shop A 0.0 ACI 142.6 146.0 0.0 98 AC 46 8/28/08 P Parking East of Shop 0.0 ACI 138.9 146.0 0.0 95 AC 47 8/28/08 P Parking East of Shop 0.0 ACI 141.1 146.0 0.0 97 AC 48 8/28/08 P Parking East of Shop 0.0 ACI 140.3 146.0 0.0 96 AC 49 8/28/08 P Entry Driveway West ofF 0.0 ACI 140.6 146.0 0.0 96 AC 50 8/28/08 P Entry Driveway West ofF 0.0 ACI 139.9 146.0 0.0 96 AC 51 8/28/08 P Entry Driveway West of 0.0 ACI 138.8 146.0 0.0 95 AC 52 8/28/08 P North of Major C 0.0 AC! 138.9 146.0 : 0.0 95 AC 53 8/28/08 P North of Major C 0.0 ACI 140.1 146.0 0.0 96 AC 54 8/28/08 P North of Major C Parking 0.0 ACI 139.1 146.0 0.0 95 AC 55 8/28/08 P North of Major C Parking 0.0 ACI 140.8 146.0 0.0 96 AC 56 8/28/08 P North of Major C Parking 0.0 AC1 139.4 146.0 0.0 95 AC 57 8/28/08 P North of Major C Parking 0.0 ACI 143.3 146.0 0.0 98 AC 58 8/28/08 P North of Major C Parking 0.0 ACI 139.0 146.0 0.0 95 AC 59 8/28/08 p North of Major C Parking 0.0 ACI 141.2 146.0 0.0 97 AC 60 8/28/08 P North of Major C Parking 0.0 ACI 138.9 146.0 0.0 95 AC 61 8/28/08 P East of Shop 0.0 ACI 139.1 146.0 0.0 95 AC 62 8/28/08 P East of Shop D 0.0 ACI 139.4 146.0 0.0 95 AC 63 8/28/08 P East of Shop D 0.0 ACI 139.0 146.0 0.0 95 AC 64 8/28/08 P East of Shop D 0.0 ACI 139.1 146.0 0.0 95 Project Number: 971009-050 0 Project Name: LNR/Bressi Project Location: 0 Client: 0 Page 2of8 6/8/20 11:32:04AM - - - - - - - - - - - - - - - - -. - - SUMMARY OF FIELD DENSITY TESTS Test Test Test Location Test Soil Dry Density Moisture (%) Relative (%) No. Date Of Lot # Elev (ft) Type Field Max Field Opt. Compaction Remarks AC 65 8/28/08 P East of Shop D 0.0 AC! 141.2 146.0 0.0 97 AC 66 8/28/08 P South of Shop D 0.0 AC! 139.4 146.0 0.0 95 AC 67 9/3/08 P South of Shop D 0.0 ACI 140.0 146.0 0.0 96 AC 68 9/3/08 P South of Shop D 0.0 AC! 142.7 146.0 0.0 98 AC 69 9/3/08 P South of Shop D 0.0 AC! 142.7 146.0 0.0 98 AC 70 9/3/08 P South of Shop . 0.0 AC! 139.0 146.0 0.0 95 AC 71 9/3/08 P South of Shop 0.0 AC! 139.0 146.0 0.0 95 AC 72 9/3/08 p South of Shop D 0.0 AC! 141.2 146.0 0.0 97 AC 73 9/3/08 P South of Shop D 0.0 AC! 140.8 146.0 0.0 96 AC 74 9/3/08 P South of Major B 0.0 AC! 138.9 146.0 0.0 95 AC 75 9/3/08 P South of Major B 0.0 ACI 140.8 146.0 0.0 96 AC 76 9/3/08 P South of Major B 0.0 AC! 139.1 146.0 0.0 95 AC 77 9/3/08 P South of Major B 0.0 ACI 138.9 146.0 0.0 95 AC 78 9/3/08 P South of Major B 0.0 ACI 140.5 146.0 0.0 96 AC 79 9/3/08 P South of Major B 0.0 AC! 140.5 146.0 0.0 96 AC 80 9/3/08 P South of Major B 0.0 AC! 140.8 146.0 0.0 96 AC 81 10/14/08 PL South of Shop B 0.0 AC! 138.8 146.0 0.0 95 AC 82 10/14/08 PL South of Shop B . 0.0 AC! 138.0 146.0 0.0 95 AC 83 10/14/08 PL South of Shop C 0.0 AC! 136.7 146.0 0.0 94 Retest on 83A AC 83A 10/14/09 PL South of Shop C 0.0 ACI 140.2 146.0 0.0 96 Retest on 83 AC 84 10/14/09 PL South of Shop C 0.0 ACI 141.8 146.0 0.0 97 AC 85 10/14/09 PL South of Shop E 0.0 AC! 138.4 146.0 0.0 95 AC 86 10/14/09 PL South of Shop E 0.0 AC! 141.5 146.0 0.0 97 AC 87 10/14/09 PL South of Shop 0.0 AC! 140.0 146.0 0.0 96 AC 88 10/14/09 PL West of Major C 0.0 AC! 143.0 146.0 0.0 98 AC 89 10/14/09 PL West of Major C 0.0 AC! 138.7 146.0 0.0 95 AC 90 10/14/09 PL West of Major C 0.0 AC! 142.7 146.0 0.0 98 AC 91 10/14/09 PL West of Major C 0.0 ACI 139.4 146.0 0.0 95 AC 92 11/7/09 PL North of Major A 0.0 AC! 141.2 146.0 0.0 97 AC 93 11/7/09 PL North of Major A 0.0 AC! 138.0 146.0 0.0 95 AC 94 11/7/09 PL North of Major A 0.0 ACI 139.1 146.0 0.0 95 AC 95 11/7/08 PL North of Major A 0.0 ACI 134.5 146.0 0.0 92 Retest on 95A Project Number: 971009-050 Project Name: LNR/Bressi Project Location: 0 Client: 0 Page 3of8 6/8/20 11:32:04AM - mm - - - - - - - - - - - - - - - - SUMMARY OF FIELD DENSITY TESTS Test Test Test Location Test Soil Dry Density Moisture (%) Relative (%) No. Date Of Lot # Elev (ft) Type Field Max Field Opt. Compaction Remarks AC 95A 11/7/08 PL North of Major A 0.0 ACI 141.6 146.0 0.0 97 Retest of95 AC 96 11/7/08. FL North of Major A 0.0 ACI 138.1 146.0 0.0 95 AC 97 11/7/08 PL North of Major A 0.0 ACI 138.0 146.0 0.0 95 AC 98 11/7/08 PL North of Major A 0.0 ACI 134.5 146.0 0.0 92 Retest on 98A AC 98A 11/7/08 FL North of Major A . 0.0 AC! 138.4 146.0 0.0 95 Retest of98 AC 99 11/7/08 PL North of Major A 0.0 AC! 138.5 146.0 0.0 95 AC 100 11/7/08 PL North of Major A 0.0 AC! 141.1 146.0 0.0 97 AC 101 11/7/08 PL North of Major A 0.0 ACI 141.8 146.0 0.0 97 AC 102 11/7/08 PL North of Major A 0.0 ACI 138.7 146.0 0.0 95 AC 103 11/7/08 PL North of Major A 0.0 ACI 138.2 146.0 0.0 95 AC 104 11/7/08 PL North of Major A 0.0 ACI 139.4 146.0 0.0 95 AC 105 11/7/08 FL North of Major A 0.0 ACI 133.9 146.0 0.0 92 Retest on 105A AC 105A 11/7/08 PL North of Major A 0.0 ACI 139.6 146.0 0.0 96 Retest of 105 AC 106 12/30/09 PL Major C Trader Joes Parking 0.0 AC2 136.9 143.0 0.0 96 AC 107 12/30/09 PL Major C Trader Joes Parking 0.0 ACI 138.1 146.0 0.0 95 AC 108 12/30/09 PL Major C Trader Joes Parking 0.0 AC2 135.2 143.0 0.0 95 AC 109 12/30/09 PL Major C Trader Joes Parking 0.0 AC2 135.7 143.0 0.0 95 AC 110 12/30/09 PL Major C Trader Joes Parking 0.0 AC2 137.3 143.0 0.0 96 AC 111 12/30/09 PL Major C Trader Joes Parking 0.0 AC2 135.2 143.0 0.0 95 AC 112 12/30/09 PL Major C Trader Joes Parking 0.0 AC2 132.3 143.0 0.0 93 AC 113 12/30/09 PL Major C Trader Joes Parking 0.0 AC2 138.2 143.0 0.0 97 AC 114 12/30/09 PL Major C Trader Joes Parking 0.0 AC2 136.2 143.0 0.0 95 AC 115 12/30/09 FL Major C Trader Joes Parking 0.0 AC2 135.9 143.0 0.0 95 AC 116 12/30/09 PL Shops A,B,C Pad BNE Side 0.0 AC2 137.1 143.0 0.0 96 AC 117 12/31/09 PL Shops A, B, C Pad BNE Side 0.0 AC2 137.3 143.0 0.0 96 AC 118 12/31/09 PL Shops A,B,C Pad BNE Side 0.0 AC2 135.3 143.0 0.0 95 AC 119 12/31/09 PL Shops A,B,C Pad BNESide 0.0 AC2 138.2 143.0 0.0 97 AC 120 12/31/09 FL Shops A, B, C Pad B NE Side 0.0 AC2 135.1 143.0 0.0 94 AC 121 12/31/09 PL Shops A,B,C Pad BNE Side 0.0 AC2 139.0 14.3.0 0.0 97 AC 122 12/31/09 FL Shops A, B, C, Pad BNE Side 0.0 AC2 139.0 143.0 0.0 97 AC 123 12/31/09 FL Shops A,B,C Pad BNESide 0.0 AC2 137.4 143.0 0.0 96 AC 124 12/31/09 PL Shops A, B, C Pad B NE Side 0.0 AC2 138.5 143.0 0.0 97 Project Number: 971009-050 Project Name: LNRlBressi Project Location: 0 Client: 0 Page 4of8 618120 11:32:04AM - - - - - - - - - - - - - - - - - - - SUMMARY OF FIELD DENSITY TESTS Test Test Test Location Test Soil Dry Density Moisture (%) Relative (%) No. Date Of Lot # Elev (ft) Type Field Max Field Opt. Compaction Remarks Pad B NE Side Pad B NE Side Pad B NE Side Pad B NE Side Pad B NE Side Gateway Gateway Gateway Gateway Gateway Gateway Bressi Ranch Way Bressi Ranch Way Bressi Ranch Way Bressi Ranch Way Bressi Ranch Way Front Major A of D, C, B of D, C, B AC 125 12/31/09 PL AC 126 12/31/09 PL AC 127 12/31/09 PL AC 128 12/31/09 PL AC 129 12/31/09 PL AC 130 12/31/09 D AC 131 12/31/09 D AC 132 12/31/09 D AC 133 12/31/09 D AC 134 12/31/09 D AC 135 12/31/09 D AC 136 12/31/09 D AC 137 12/31/09 D AC 138 12/31/09 D AC 139 12/31/09 D AC 140 12/31/09 D AC 141 12/31/09 D AC 142 12/31/08 D AC 143 12/31/08 D AC 144 12/31/08 D AC 145 12/31/08 D AC 146 12/31/08 D AC 147 12/31/08 D AC 148 12/31/08 D AC 149 12/31/08 D AC 150 12/31/08 D AC 151 12/31/08 D AC 152 12/31/08 D AC 153 1/7/09 D AC 154 1/7/09 D AC 155 1/7/09 PL AC 156 1/7/09 PL Project Number:. Project Name: Project Location: Client: Shops A, B, C Shops A, B, C Shops A, B, C Shops A, B, C Shops A, B, C Entrance from Entrance from Entrance from Entrance from Entrance from Entrance from Driveway from Driveway from Driveway from Driveway from Driveway from Driveway from Front Major A Front Major A Front Major A Front Major A Shop E Front Shop E Front Major B Front Major B Front Major B Front Circle Corner Circle Corner Major A E Side Major A E Side Major A E Side Major A E Side 971009-050 LNR/Bressi 0 0 0.0 AC2 136.2 143.0 0.0 95 0.0 AC2 138.3 143.0 0.0 97 0.0 AC2 140.1 143.0 0.0 98 0.0 AC2 135.8 143.0 0.0 95 0.0 AC2 135.2 143.0 0.0 95 0.0 AC2 137.7 143.0 0.0 96 0.0 AC2 139.1 143.0 0.0 97 0.0 AC2 136.3 143.0 0.0 95 0.0 AC2 135.7 143.0 0.0 95 0.0 AC2 138.1 143.0 0.0 97 0.0 AC2 138.7 143.0 0.0 97 0.0 ACI 140.3 146.0 0.0 96 0.0 ACI 142.5 146.0 0.0 98 0.0 ACI 138.5 146.0 0.0 95 0.0 ACI 138.8 146.0 0.0 95 0.0 ACI 141.3 146.0 0.0 97 0.0 ACI 139.2 146.0 0.0 95 0.0 ACI 143.1 146.0 0.0 98 0.0 ACI 140.0 146.0 0.0 . 96 0.0 ACI 138.6 146.0 0.0 95 0.0 ACI 138.8 146.0 0.0 95 0.0 ACI 140.4 146.0 0.0 96 0.0 ACI 138.8 146.0 0.0 95 0.0 ACI 138.5 146.0 0.0 95 0.0 ACI 144.1 146.0 0.0 99 0.0 AC 1, 141.3 146.0 0.0 97 0.0 AC! 142.6 146.0 0.0 98 0.0 ACI 139.9 146.0 0.0 96 0.0 AC2 136.4 143.0 0.0 . 95 0.0 AC2 136.8 143.0 0.0 96 0.0 AC2 139.1 143.0 . 0.0 97 0.0 AC2 135.9 143.0 0.0 95 Page 5 of 8 6/I20 11:32:04AM - - - - - - - - - - - - - - - - - - - SUMMARY OF FIELD DENSITY TESTS Test No. Test Date Test Of Location Test Lot # Elev (ft) Soil Type Dry Density Field Max Moisture (%) Field Opt. Relative (%) Compaction Remarks AC 157 1/7/09 D Major AESide 0.0 AC2 135.8 143.0 0.0 95 AC 158 1/7/09 D Major ASSide 0.0 AC2 135.6 143.0 0.0 95 AC 159 1/7/09 D Major AS Side 0.0 AC2 135.6 143.0 0.0 95 AC 160 1/7/09 D Major ASSide 0.0 AC2 138.3 143.0 0.0 97 AC 161 1/7/09 D Major AS Side 0.0 AC2 139.4 143.0 0.0 97 AC 162 1/7/09 D Major AS Side 0.0 AC2 136.1 143.0 0.0 95 AC 163 1/7/09 D Major AS Side 0.0 AC2 136.1 143.0 0.0 95 AC 164 1/7/09 D Major ASSide 0.0 AC2 138.3 143.0 0.0 97 AC 165 1/7/09 D Major A W Side 0.0 AC2 137.1 143.0 0.0 96 AC 166 1/7/09 D Major A WSide 0.0 AC2 137.7 143.0 0.0 96 AC 167 1/7/09 D Major A WSide 0.0 AC2 139.1 143.0 0.0 97 AC 168 1/7/09 PL Major A W Side 0.0 AC2 135.4 143.0 0.0 95 AC 169 1/7/09 PL Major A W Side 0.0 AC2 136.0 143.0 0.0 95 AC 170 1/7/09 PL Major A W Side 0.0 AC2 135.5 143.0 0.0 95 AC 171 1/7/09 PL Major AWSide 0.0 AC2 136.8 143.0 0.0 96 AC 172 1/7/09 PL Major AWSide 0.0 AC2 138.3 143.0 0.0 97 AC 173 1/7/09 PL Major A W Side 0.0 AC2 135.9 143.0 0.0 95 AC 174 1/7/09 D Major AWSide 0.0 AC2 137.9 143.0 0.0 96 AC 175 1/7/09 D Access Rd from Bressi Ranch Way 0.0 AC2 138.1 143.0 0.0 97 AC 176 1/7/09 D Access Rd from Bressi Ranch Way 0.0 AC2 135.6 143.0 0.0 95 AC 177 1/7/09 D Access Rd from Bressi Ranch Way 0.0 AC2 135.9 143.0 0.0 95 AC 178 1/7/09 D Access Rd from Bressi Ranch Way 0.0 AC2 136.1 143.0 0.0 95 AC 179 1/7/09 D Access Rd from Bressi Ranch Way 0.0 AC2 136.7 143.0 0.0 96 AC 180 1/8/09 PL North Major B Parking Lot 0.0 AC2 135.3 143.0 0.0 95 AC 181 1/8/09 PL North Major B Parking Lot 0.0 AC2 135.4 143.0 0.0 95 AC 182 1/8/09 PL North Major B Parking Lot 0.0 AC2 136.1 143.0 0.0 95 AC 183 1/8/09 D South of Rubios or Shop F 0.0 AC2 137.3 143.0 0.0 96 AC 184 1/8/09 D South of Rubios or Shop F 0.0 AC2 135.8 143.0 0.0 95 AC 185 1/8/09 PL South of Rubios or Shop F 0.0 AC2 130.8 143.0 0.0 91 AC 186 1/8/09 PL North of Major A 0.0 AC2 137.3 143.0 0.0 96 AC 187 1/8/09 PL North of major A 0.0 AC2 138.0 143.0 0.0 97 AC 188 1/8/09 PL North of Major A 0.0 AC2 136.4 143.0 0.0 95 Project Number: 971009-050 Project Name: LNR/Bressi Project Location: 0 ki Client: 0 Page 6of8 6/8/20 11:32:04AM - - - - - - - - - - - - - - - - - - - SUMMARY OF FIELD DENSITY TESTS Test No. Test Date Test Location Of . Test Lot # Elev (ft) Soil Type Dry Density Field Max Moisture (%) Field Opt. Relative (%) Compaction Remarks AC 189 1/8/09 PL North of Major A 0.0 AC2 135.3 143.0 0.0 95 AC 190 1/8/09 PL North of Major A 0.0 AC2 139.3 143.0 0.0 97 AC 191 1/8/09 PL North of Major 0.0 AC2 135.7 143.0 0.0 95 AC 192 1/8/09 PL North of Major 0.0 AC2 135.9 143.0 0.0 95 AC 193 1/8/09 PL South of Shop G 0.0 AC2 138.1 143.0 0.0 97 AC 194 1/8/09 D South of Shop G 0.0 AC2 137.3 143.0 0.0 96 AC 195 1/8/09 D South of Shop 0.0 AC2 140.1 143.0 0.0 98 AC 196 1/8/09 PL North of Major A 0.0 AC2 135.8 143.0 0.0 95 AC 197 1/8/09 PL North of Major A 0.0 AC2 136.1 143.0 0.0 95 AC 198 1/8/09 PL North of Major A 0.0 AC2 135.3 143.0 0.0 95 AC 199 1/8/09 PL North of Major A 0.0 AC2 135.7 143.0 0.0 95 AC 200 1/8/09 D North of Major A . 0.0 AC2 139.3 143.0 0.0 97 AC 201 1/8/09 PL North of Major A 0.0 AC2 136.1 143.0 0.0 95 AC 202 1/8/09 PL North of Major A 0.0 AC2 136.7 143.0 0.0 96 AC 203 1/8/09 D Major A North Side 0.0 AC2 138.9 143.0 0.0 97 AC 204 1/8/09 D Major ANorth Side 0.0 AC2 136.2 143.0 0.0 95 AC 205 1/8/09 D Major ANorth Side 0.0 AC2 135.9 143.0 0.0 95 AC 206 1/8/09 D Shop E North Side 0.0 AC2 135.7 143.0 0.0 95 AC 207 1/8/09 D Shop E North Side 0.0 AC2 138.0 143.0 0.0 97 AC 208 1/8/09 D Major B North Side 0.0 AC2 140.1 143.0 0.0 98 AC 209 1/8/09 D Major B North Side 0.0 AC2 141.2 143.0 0.0 99 AC 210 1/8/09 D Circle Shop c/o Major B 0.0 AC2 137.4 143.0 0.0 96 AC 211 1/8/09 PL Parking Bay South of Major B 0.0 AC2 135.7 143.0 0.0 95 AC 212 1/8/09 PL Parking Bay South of Major B 0.0 AC2 138.2 143.0 0.0 97 AC 213 1/9/09 PL South of Shop E 0.0 AC2 135.8 143.0 0.0 95 AC 214 1/9/09 D South of Shop E 0.0 AC2 139.3 143.0 0.0 97 AC 215 1/9/09 D South of Shop E 0.0 AC2 136.6 143.0 0.0 96 AC 216 1/9/09 PL South of Major B 0.0 AC2 136.1 143.0 0.0 95 AC 217 1/9/09 PL South of Major B 0.0 AC2 135.4 143.0 0.0 95 AC 218 1/9/09 D South of Major B 0.0 AC2 135.8 143.0 0.0 95 AC 219 1/9/09 D South of Shop D 0.0 AC2 137.4 143.0 0.0 96 AC 220 1/9/09 FL South of Shop 0.0 AC2 135.7 143.0 0.0 95 Project Number: 971009-050 Project Name: LNR/Bressi Project Location: 0 Client: 0 Page 7of8 6/8/20 11:32:04AM min — — — — — — — — — — — — — — — — — SUMMARY OF FIELD DENSITY TESTS Test Test Test Location Test Soil Dry Density Moisture (%) Relative (%) No. Date Of Lot # Elev (ft) Type Field Max Field Opt. Compaction Remarks AC 221 1/9/09 PL South of Shop D 0.0 AC2 135.8 143.0 0.0 95 AC 222 1/9/09 PL South of Shop D 0.0 AC2 135.4 143.0 0.0 95 AC 223 1/9/09 D East of Shop D 0.0 AC2 138.1 143.0 0.0 97 AC 224 1/9/09 D Circle Corner Shop D 0.0 AC2 136.9 143.0 0.0 96 AC 225 1/9/09 D North of Shop D 0.0 AC2 140.1 143.0 0.0 98 AC 226 1/9/09 D North of Shop D 0.0 AC2 138.3 143.0 0.0 97, AC 227 1/9/09 D North of Shop D 0.0 AC2 137.2 143.0 0.0 96 Project Number: 971009-050 Project Name: LNR/Bressi Project Location: 0 Client: 0 Page 8 of 8 - - - - - - - - - - - - - - - - - - - SUMMARY OF FIELD DENSITY TESTS Test Test Test Location Test Soil Dry Density Moisture (%) Relative (%) No. Date Of Lot # Elev (ft) Type Field Max Field Opt. Compaction Remarks AB 1 6/4/08 ST El Fuerte Street Station 18+50 0.0 10 120.8 125.5 9.5 10.0 96 AB 2 6/4/08 ST El Fuerte Street Station 18+70 0.0 10 121.5 125.5 11.2 10.0 97 AB 3 6/11/08 DA Driveway Entrance from Gateway Rd. 0.0 10 120.8 125.5 11.2 10.0 96 AB 4 6/11/08 DA Driveway Entrance from Gateway Rd. 0.0 10 120.0 125.5 10.8 10.0 96 AB 5 6/12/08 DA Driveway Entrance from Finnila P1. 0.0 10 122.7 125.5 10.3 10.0 98 AB 6 6/12/08 DA Driveway Entrance from FinnilaPi. 0.0 10 120.5 125.5 10.6 10.0 96 AB 7 8/22/08 P South of Shop G 0.0 11 126.7 130.0 10.3 9.0 97 AB 8 8/22/08 P South of Shop G 0.0 11 126.0 130.0 9.5 9.0 97 AB 9 8/22/08 P South of Shop 0.0 11 124.9 130.0 9.8 9.0 96 AB 10 8/22/08 P North of Major A 0.0 11 126.2 130.0 11.4 9.0 97 AB 11 8/22/08 P North of Major A 0.0 11 124.8 130.0 10.6 9.0 96 AB 12 8/22/08 P North of Major A 0.0 11 125.0 130.0 10.7 9.0 96 AB 13 8/22/08 P North of Major A 0.0 11 126.7 130.0 9.7 9.0 97 AB 14 8/22/08 P North of Major A 0.0 11 125.2 130.0 9.9 9.0 96 AB 15 8/22/08 P North of Major A 0.0 11 124.8 130.0 10.7 9.0 96 AB 16 8/22/08 p North of Major A 0.0 11 124.7 130.0 10.0 9.0 96 AB 17 8/25/08 P South of Shop F 0.0 11 120.8 130.0 9.5 9.0 93 Retest on 17A AB 17A 8/25/08 P South of Shop F 0.0 11 125.7 130.0 10.1 9.0 97 Retest of 17 AB 18 8/25/08 P South of Shop F 0.0 11 124.3 130.0 9.5 9.0 96 AB 19 8/25/08 P South of Shop F 0.0 11 124.0 130.0 9.8 9.0 95 AB 20 8/25/08 P South of Shop F 0.0 11 124.8 130.0 9.3 9.0 96 AB 21 8/25/08 P South of Shop F 0.0 11 125.6 130.0 9.0 9.0 97 AB 22 8/25/08 p South of Shop F 0.0 II 125.5 130.0 10.6 9.0 97 AB 23 8/25/08 P South of Shop F 0.0 11 123.9 130.0 9.2 9.0 95 AB 24 8/26/08 ST West of Shop F 0.0 11 124.8 130.0 9.2 9.0 96 AB 25 8/25/08 ST West of Shop F 0.0 11 124.8 130.0 9.2 9.0 96 AB 26 8/26/08 P East of Pad B 0.0 11 124.8 130.0 9.9 9.0 96 AB 27 8/26/08 P East of Pad B 0.0 11 123.9 130.0 10.0 9.0 95 AB 28 8/26/08 P East of Pad B 0.0 11 123.9 130.0 10.4 9.0 95 AB 29 8/26/08 P East of Pad B 0.0 11 124.3 130.0 9.7 9.0 96 AB 31 8/26/08 P East of Pad B 0.0 11 124.8 130.0 9.8 9.0 96 AB 32 8/26/08 P East of Pad 0.0 11 125.2 130.0 9.3 9.0 96 Project Number: 971009-050 Project Name: LNR/Bressi Project Location: 0 Client: 0 Page 1 of 5 6/8/20 2:41:19PM AB 33 8/26/08 p East of Shop A AB 34 8/26/08 p North of Shop B AB 35 8/26/08 p North of Shop C AB 36 8/26/08 P North of Shop C AB 37 8/26/08 ST NE of Shop C AB 38 8/26/08 ST E of Shop C AB 39 8/26/08 ST Eof Shop C AB 40 8/26/08 ST N of Major C AB 41 8/26/08 ST N of Major C AB 42 8/26/08 ST N of Major C AB 43 8/26/08 ST N of Major C AB 44 8/26/08 ST N of Major C AB 45 8/26/08 ST N of Major C AB 46 8/26/08 ST N of Major C AB 47 9/2/08 P South of Shop D AB 48 9/2/08 P South of Shop D AB 49 9/2/08 P South of Shop D AB 50 9/2/08 P South of Shop D AB 51 9/2/08 P South of Shop D AB 52 9/2/08 ST E of Shop D AB 53 9/2/08 ST Eof Shop D AB 54 9/2/08 ST E of Shop D AB 55 9/2/08 P S of Major B AB 56 9/2/08 P Sof Major B AB 57 9/2/08 P S of Major B AB 58 9/2/08 P Sof Major B AB 59 9/2/08 p s of Major B AB 60 9/2/08 P S of Major B AB 61 9/24/08 P Major C AB 62 9/24/08 P Major C AB 63 9/24/08 XG N of Major C AB 64 9/24/08 XG N of Major C Project Number: 971009-050 Project Name: LNR1Bressi Project Location: 0 Client: 0 0.0 11 126.0 130.0 10.4 9.0 97 0.0 11 124.8 130.0 9.3 9.0 96 0.0 11 125.2 130.0 9.8 9.0 96 0.0 11 124.7 130.0 9.7 9.0 96 0.0 11 124.3 130.0 9.8 9.0 96 0.0 11 125.2 130.0 10.3 9.0 96 0.0 11 124.0 130.0 10.2 9.0 95 0.0 11 124.7 130.0 10.3 9.0 96 0.0 11 124.2 130.0 9.7 9.0 96 0.0 11 123.9 130.0 10.4 9.0 95 0.0 11 125.2 130.0 10.6 9.0 96 0.0 11 124.7 130.0 9.5 9.0 96 0.0 11 125.5 130.0 9.0 9.0 97 0.0 11 124.0 130.0 10.1 9.0 95 0.0 11 125.2 130.0 9.5 9.0 96 0.0 11 123.9 130.0 9.3 9.0 95 0.0 11 125.9 130.0 10.4 9.0 97 0.0 11 126.0 130.0 9.5 9.0 97 0.0 11 124.8 130.0 9.8 9.0 96 0.0 11 124.7 130.0 9.3 9.0 96 0.0 11 123.9 130.0 9.6 9.0 95 0.0 11 124.0 130.0 10.4 9.0 95 0.0 11 124.3 130.0 10.4 9.0 96 0.0 11 123.9 130.0 10.0 9.0 95 0.0 11 126.7 130.0 9.8 9.0 97 0.0 11 126.2 130.0 9.4 9.0 97 0.0 11 125.0 130.0 9.9 9.0 96 0.0 11 126.7 130.0 10.3 9.0 97 0.0 11 127.4 130.0 11.3 9.0 98 0.0 11 128.2 130.0 11.0 9.0 99 0.0 11 125.6 130.0 9.8 9.0 97 0.0 11 125.9 130.0 9.7 9.0 97 Page 2 of 5 - - 10111=11=1 - - - - - - - - - - - - - SUMMARY OF FIELD DENSITY TESTS Test Test Test Location Test Soil Dry Density Moisture (%) Relative (%) No. Date Of Lot # Elev (ft) Type Field Max Field Opt. Compaction Remarks 6/8/20 2:41:20PM - - - - - - - - - - - - - - - - - - - SUMMARY OF FIELD DENSITY TESTS Test Test Test Location Test Soil Dry Density Moisture (%) Relative (%) No. Date Of Lot # Elev (ft) Type Field Max Field Opt. Compaction Remarks AB 65 10/13/08 ST S of Shop B 0.0 12 114.5 127.0 10.5 6.5 90 Retest on 65A AB 65A 10/13/08 ST S of Shop B 0.0 12 121.8 127.0 9.2 6.5 96 Retest of 65 AB 66 10/13/08 ST S. of Shop B 0.0 12 116.2 127.0 11.7 6.5 91 Retest on66A AB 66A 10/13/08 ST S. of Shop B 0.0 12 121.3 127.0 9.8 6.5 96 Retest of 66 AB 67 10/13/08 ST S. of Shop B 0.0 12 114.0 127.0 10.8 6.5 90 Retest on 67A AB 67A 10/13/08 ST S. of Shop C 0.0 12 122.9 127.0 7.9 6.5 97 Retest of 67 AB 68 10/13/08 ST S of Shop C 0.0 12 115.9 127.0 11.0 6.5 91 Retest on 68A AB 68A 10/13/08 ST S of Shop C 0.0 12 121.8 127.0 8.5 6.5 96 Retest of 68 AB 69 10/13/08 ST Sof Shop C 0.0 12 121.9 127.0 8.0 6.5 96 AB 70 10/13/08 ST S of Shop C 0.0 12 122.8 127.0 7.9 6.5 97 AB 71 10/13/08 PL N of Major C 0.0 12 122.9 127.0 7.9 6.5 97 AB 72 10/13/08 PL N of Major C 0.0 12 122.8 127.0 8.2 6.5 97 AB 73 10/13/08 PL Nof Major C 0.0 12 121.5 127.0 8.0 6.5 96 AB 74 10/13/08 PL N of Major C 0.0 12 122.8 127.0 8.8 6.5 97 AB 75 10/13/08 PL S of Shop E 0.0 12 122.0 127.0 8.4 6.5 96 AB 76 10/13/08 PL Sof Shop E 0.0 12 121.6 127.0 8.3 6.5 96 AB 77 10/13/08 PL S of Shop E 0.0 12 122.3 127.0 8.0 6.5 96 AB 78 10/13/08 PL S of Shop E 0.0 12 122.3 127.0 8.0 6.5 96 AB 79 10/12/08 DA South Entrance 0.0 12 122.5 127.0 9.2 6.5 96 AB 80 11/6/08 PL Nof Major A 0.0 11 125.7 130.0 10.0 9.0 97 AB 81 11/6/08 PL Nof Major A 0.0 11 126.7 130.0 9.1 9.0 97 AB 82 11/6/08 PL N of Major A 0.0 11 123.0 130.0 8.2 9.0 95 AB 83 11/6/08 PL N of Major A 0.0 11 123.8 130.0 7.6 9.0 95 AB 84 11/6/08 PL N of Major A 0.0 11 125.6 130.0 7.0 9.0 97 AB 85 11/6/08 PL N of Major A 0.0 11 123.7 130.0 9.4 9.0 95 AB 86 11/6/08 PL Nof Major A 0.0 11 124.8 130.0 8.7 9.0 96 AB 87 11/6/08 PL Nof Major A 0.0 11 122.9 130.0 7.7 9.0 95 AB 88 11/6/08 PL Nof Major A . 0.0 11 125.8 130.0 7.2 9.0 97 AB 89 11/6/08 PL Nof Major A 0.0 11 125.7 130.0 8.4 9.0 97 AB 90 11/6/08 PL Nof Major A 0.0 11 124.6 130.0 8.0 9.0 96 AB 91 11/6/08 PL Nof Major A 0.0 11 122.3 130.0 7.4 9.0 94 Retest on 91A AB 91A 11/6/08 PL Nof Major A 0.0 11 125.3 130.0 8.1 9.0 96 Retest of91 Project Number: 971009-050 0 Project Name: LNR/Bressi Project Location: 0 Client: 0 Page 3of5 6/8/20 2:41:20PM - - - - - - - - - - - - - - - - - - - SUMMARY OF FIELD DENSITY TESTS Test Test Test Location Test Soil Dry Density Moisture (%) Relative (%) No. Date Of Lot # Elev (ft) Type Field Max Field Opt. Compaction Remarks AB 92 11/6/08 PL N of Major A 0.0 11 124.7 130.0 9.0 9.0 96 AB 93 11/6/08 PL N of Major A 0.0 11 123.1 130.0 8.8 9.0 95 AB 94 12/29/08 D Driveway N Side of Shop EfB 0.0 12 122.3 127.0 5.9 6.5 96 AB 95 12/29/08 D Driveway N Side of Shop EfB 0.0 12 118.1 127.0 6.3 6.5 93 Retest on95A AB 95 12/29/08 D Driveway N Side of Shop E/B 0.0 12 125.7 127.0 6.9 6.5 99 AB 96 12/29/08 D Driveway N Side of Shop E/B 0.0 12 122.7 127.0 5.3 6.5 97 AB 97 12/29/08 D Driveway Side of Major A 0.0 12 120.9 127.0 6.1 6.5 95 AB 98 12/29/08 D Driveway N Side of Major A 0.0 12 121.3 127.0 6.7 6.5 96 AB 99 12/29/08 D Driveway N Side of Major A 0.0 12 119.1 127.0 5.3 6.5 94 Retest on 99A AB 99A 12/29/08 D Driveway N Side of Major A 0.0 12 120.7 127.0 5.5 6.5 95 Retest of99 AB 100 12/29/08 D Driveway N Side of Major A 0.0 12 123.4 127.0 5.2 6.5 97 AB 101 12/29/08 D Driveway Side of Shop E 0.0 12 120.4 127.0 6.8 6.5 95 AB 102 12/29/08 D Between Major A&ShopE 0.0 12 124.3 127.0 6.6 6.5 98 AB 103 12/31/08 D Between Major to Shop E 0.0 13 124.1 131.1 8.3 7.8 95 AB 104 12/31/08 D Between Major to Shop E 0.0 13 123.9 131.1 8.0 7.8 95 AB 105 12/31/08 D Between Major A To Shop E 0.0 13 123.9 131.1 9.2 7.8 95 AB 106 12/31/08 D Between Major To Shop E 0.0 13 125.1 131.1 7.9 7.8 95 AB 107 12/31/08 D Between Major A to Shop E 0.0 13 126.3 131.1 8.3 7.8 96 AB 108 12/31/08 D Front Major A 0.0 13 123.9 131.1 9.9 7.8 95 AB 109 12/31/08 D Front Major A 0.0 13 124.4 131.1 8.1 7.8 95 AB 110 12/31/08 D Front Major A 0.0 13 125.3 131.1 8.8 7.8 96 AB 111 12/31/08 D Front Major A 0.0 13 128.1 131.1 7.8 7.8 98 AB 112 12/31/08 D Front Shop 0.0 13 125.9 131.1 9.1 7.8 96 AB 113 12/31/08 D Front Shop 0.0 13 127.3 131.1 8.9 7.8 97 AB 114 12/31/08 D Front Shop 0.0 13 126.1 131.1 9.3 7.8 96 AB 115 12/31/08 D Front Major B 0.0 13 126.8 131.1 9.1 7.8 97 AB 116 12/31/08 D Front Major B 0.0 13 124.9 131.1 8.0 7.8 95 AB 117 12/31/08 D Front Major B 0.0 13 125.5 131.1 9.2 7.8 96 AB 118 1/6/09 D Major AE Side 0.0 13 124.9 131.1 8.1 7.8 95 AB 119 1/6/09 D Major AE Side 0.0 13 125.5 131.1 9.3 7.8 96 AB 120 1/6/09 PL Major AESide 0.0 13 125.3 131.1 9.1 7.8 96 AB 121 1/6/09 PL Major AE Side 0.0 13 127.1 131.1 8.6 7.8 97 Project Number: 971009-050 0 Project Name: LNR/Bressi Project Location: 0 Client: 0 Page 4of5 6/8/20 2:41:20PM - - - - - - - - - - - - - - - - - - - SUMMARY OF FIELD DENSITY TESTS Test Test Test Location Test Soil Dry Density Moisture (%) Relative (%) No. Date Of Lot # Elev (ft) Type Field Max Field Opt. Compaction Remarks AB 122 1/6/09 D Major A E Side 0.0 13 128.5 131.1 7.6 7.8 98 AB 123 1/6/09 D Major AS Side 0.0 13 126.6 131.1 7.9 7.8 97 AB 124 1/6/09 D Major ASSide 0.0 13 124.6 131.1 8.3 7.8 95 AB 125 1/6/09 D Major S Side 0.0 13 129.1 131.1 8.1 7.8 98 AB 126 1/6/09 D Major ASSide 0.0 13 124.4 131.1 8.8 7.8 95 AB 127 1/6/09 D Major AS Side 0.0 13 124.5 131.1 9.6 7.8 95 AB 128 1/6/09 D Major AWSide 0.0 13 127.1 131.1 8.3 7.8 97 AB 129 1/6/09 PL . Major AWSide . 0.0 13 125.3 131.1 7.6 7.8 96 AB 130 1/6/09 PL Major AWSide 0.0 13 125.5 131.1 7.9 7.8 96 AB 131 1/6/09 D Major AWSide 0.0 13 124.8 131.1 8.1 7.8 95 AB 132 1/6/09 PL Major A W Side 0.0 13 124.3 131.1 9.3 7.8 95 AB 133 1/6/09 D Major AWSide 0.0 13 128.1 131.1 7.8 7.8 98 AB 134 1/6/09 D Major A W Side 0.0 13 125.6 131.1 8.9 7.8 96 Project Number: 971009-050 . Project Name: . LNR/Bressi . Project Location: 0 Client: 0 Page 5 of 5 6/8/20 2:41:20PM - - - - - - - - - - - - - - - - - - - SUMMARY OF FIELD DENSITY TESTS F Test Test Test Location Test Soil Dry Density Moisture (%) Relative (%) No. Date Of Lot # Elev (ft) Type Field Max Field Opt. Compaction Remarks SG 1 6/16/08 C SG 2 6/16/08 C SO 3 6/16/08 C SG 4 6/16/08 C SG 5 6/16/08 C SG 6 6/16/08 C SO 7 6/16/08 C SG 8 6/16/08 C SO 9 6/16/08 C SG 10 6/16/08 C SG 11 6/17/08 ST SO 12 6/17/08 ST SO 13 6/17/08 ST SG 14 6/17/08 ST SG 15 6/17/08 ST SO 16 6/18/08 C SG 17 6/18/08 C SG 18 6/18/08 C SO 19 6/18/08 C SO 20 6/18/08 CG SO 21 6/18/08 ST SO 22 6/18/08 ST SG 23 6/18/08 ST SG 24 6/18/08 ST SG 25 6/18/08 ST 50 26 6/18/08 ST SO 27 6/18/08 ST SO 28 6/18/08 ST SG 29 6/18/08 ST SO 30 6/18/08 ST SG 31 6/18/08 ST SO 32 6/18/08 ST Project Number: Project Name: Project Location: Client: North of Major A North of Major A North of Major A North of Major A North of Major A North of Major A North of Shop E North of Shop E East of Shop E East of Shop E North of Major A North of Major A North of Major A North of Major A North of Major A Northwest of Major A Southeast of Shop E North of Shop E North of Major B North of Shop D North of Major A Northeast of Shop E East of Shop E Southeast of Shop E Southeast of Shop E North of Shop E North of Major B North of Major B North of Major B North of Major B North of Shop D North of Shop D 0.0 4 109.9 113.0 16.9 16.0 97 0.0 4 108.5 113.0 16.8 16.0 96 0.0 4 108.5 113.0 16.5 16.0 96 0.0 9 106.6 112.0 16.1 15.5 95 0.0 9 107.9 112.0 16.0 15.5 96 0.0 9 107.5 112.0 15.9 15.5 96 0.0 9 106.8 112.0 15.4 15.5 95 0.0 9 106.7 112.0 15.9 15.5 95 0.0 9 107.5 112.0 15.6 15.5 96 0.0 9 106.8 112.0 15.8 15.5 95 0.0 2 111.2 116.0 14.2 14.0 96 0.0 2 111.8 116.0 13.9 14.0 96 0.0 2 112.6 116.0 14.5 14.0 97 0.0 2 111.2 116.0 14.7 14.0 96 0.0 2 111.9 116.0 13.9 14.0 96 0.0 2 113.4 116.0 14.1 14.0 98 0.0 2 111.8 116.0 13.5 14.0 96 0.0 2 111.5 116.0 14.6 14.0 96 0.0 2 110.9 116.0 14.4 14.0 96 0.0 6 111.0 116.0 15.5 14.0 96 0.0 2 112.5 116.0 14.2 14.0 97 0.0 2 112.0 116.0 13.5 14.0 97 0.0 2 113.5 116.0 13.8 14.0 98 0.0 2 113.9 116.0 14.7 14.0 98 0.0 2 113.8 116.0 13.9 14.0 98 0.0 4 109.3 113.0 16.5 16.0 97 0.0 4 107.9 113.0 16.1 16.0 95 0.0 4 109.1 113.0 16.5 16.0 97 0.0 4 109.5 113.0 17.0 16.0 97 0.0 4 107.8 113.0 16.8 16.0 95 0.0 6 110.9 116.0 15.5 14.0 96 0.0 6 111.5 116.0 14.5 14.0 96 971009-050 LN R/Bressi 0 0 Page 1 of 7 6/8/20 1:19:55PM Northeast of Shop E 0.0 6 111.0 116.0 14.3 14.0 96 Northeast of Shop E 0.0 6 109.9 116.0 14.0 14.0 95 South of Major A 0.0 4 107.8 113.0 16.1 16.0 95 South of Major A 0.0 4 108.4 113.0 16.5 16.0 96 East of Major A 0.0 4 108.2 113.0 16.0 16.0 96 East of Major A 0.0 4 109.5 113.0 17.8 16.0 97 East of Major A 0.0 4 108.2 113.0 16.6 16.0 96 Northeast of Major A 0.0 4 108.0 113.0 16.7 16.0 96 Northeast of Major A 0.0 4 109.9 113.0 16.5 16.0 97 Northeast of Major A 0.0 4 108.3 113.0 16.0 16.0 96 Northeast of Major A 0.0 4 108.9 113.0 16.9 16.0 96 Northeast of Major A 0.0 4 109.5 113.0 16.5 16.0 97 Northeast of Major A 0.0 4 108.7 113.0 17.1 16.0 96 Northeast of Major A 0.0 4 108.5 113.0 16.8 16.0 96 Northeast of Major A 0.0 4 109.5 113.0 16.6 16.0 97 Northeast of Major A 0.0 4 109.9 113.0 17.2 16.0 97 North of Major A Bio Swell 0.0 2 110.7 116.0 14.9 14.0 95 North of Major A Bio Swell 0.0 2 111.5 116.0 13.9 14.0 96 North of Major A Bio Swell 0.0 2 111.0 116.0 14.1 14.0 96 South of Shop D 0.0 3 109.9 116.0 14.8 13.5 95 South of Shop D 0.0 3 109.9 116.0 13.8 13.5 95 South of Major B 0.0 3 111.5 116.0 14.2 13.5 96 South of Major B 0.0 3 111.6 116.0 14.7 13.5 96 South of Major B 0.0 3 111.6 116.0 13.9 13.5 96 South of Major B 0.0 3 111.8 116.0 13.8 13.5 96 North of Major A 0.0 6 111.8 116.0 14.5 14.0 96 North of Major A 0.0 6 110.9 116.0 13.9 14.0 96 South of Shop F 0.0 6 110.5 116.0 14.5 14.0 95 South of Shop F 0.0 6 110.8 116.0 14.8 14.0 96 South of Shop F 0.0 6 111.7 116.0 14.6 14.0 96 South of Shop F 0.0 6 110.7 116.0 14.6 14.0 95 South of Shop F 0.0 6 110.8 116.0 14.8 14.0 96 971009-050 LNR/Bressi 0 0 Page 2 of 7 SO 33 6/18/08 ST SG 34 6/18/08 ST SG 35 6/20/08 C SO 36 6/20/08 C SG 37 6/20/08 C SG 38 6/20/08 C SG 39 6/20/08 C SG 40 6/20/08 C SO 41 6/23/08 C SO 42 6/23/08 C SG 43 6/23/08 C SG 44 6/23/08 C SO 45 6/25/08 C SO 46 6/25/08 C 50 47 6/25/08 C SO 48 6/25/08 C SO 49 7/17/08 C SG 50 7/17/08 C SO 51 7/17/08 C SO 52 7/18/08 C 50 53 7/18/08 C SO 54 7/18/08 C SO 55 7/18/08 C SO 56 7/18/08 C SO 57 7/18/08 C SO 58 7/21/08 C SO 59 7/21/08 C SO 60 7/21/08 C SO 61 7/21/08 C SO 62 7/21/08 C SO 63 7/21/08 C SO 64 7/21/08 C Project Number: Project Name: Project Location: Client: - - - - - - - - - - - - - - - - - - - SUMMARY OF FIELD DENSITY TESTS Test Test Test Location Test Soil Dry Density Moisture (%) Relative (%) No. Date Of Lot # Elev (ft) Type Field Max Field Opt. Compaction Remarks 6/8/20 1:19:56PM - - - - - - - - - - - - - - - - - - - SUMMARY OF FIELD DENSITY TESTS Test Test Test Location Test Soil Dry Density Moisture (%) Relative (%) No. Date Of Lot # Elev (ft) Type Field Max Field Opt. Compaction Remarks SG 65 7/21/08 C South of Shop F 0.0 6 110.5 116.0 14.2 14.0 95 SG 66 7/21/08 C South of Shop F 0.0 6 109.9 116.0 13.8 14.0 95 SG 67 7/21/08 C South of Shop F 0.0 6 111.4 116.0 13.9 14.0 96 SO 68 7/22/08 C South of Shop G 0.0 6 110.9 116.0 14.5 14.0 96 SO 69 7/22/08 C South of Shop 0 0.0 6 109.9 116.0 14.2 14.0 95 SO 70 7/22/08 C South of Shop F 0.0 6 110.8 116.0 15.5 14.0 96 SO 71 7/22/08 C South of Shop F&O 0.0 6 107.5 116.0 13.5 14.0 93 Retest on 7 1 A SO 71A 7/22/08 C South of Shop F&G 0.0 6 111.3 116.0 14.7 14.0 96 Retest of71 SO 72 7/22/08 C West of Shop F 0.0 6 110.9 116.0 13.9 14.0 96 SO 73 7/22/08 C West of Shop F 0.0 6 111.7 116.0 14.2 14.0 96 SG 74 7/23/08 C Northeast of Pad A 0.0 5 113.5 118.0 14.2 13.0 96 SO 75 7/23/08 C Northeast of Pad A 0.0 5 112.5 118.0 13.8 13.0 95 SO 76 7/23/08 C Northeast of Pad A 0.0 5 112.0 118.0 13.3 13.0 95 SO 77 7/24/08 C East of Pad A 0.0 5 114.5 118.0 14.5 13.0 97 SO 78 7/24/08 C Southeast of Pad A 0.0 5 113.8 118.0 14.3 13.0 96 SO 79 7/24/08 C East of Pad A 0.0 5 113.6 118.0 14.5 13.0 96 SO 80 7/24/08 C East of Pad A 0.0 5 113.7 118.0 13.9 13.0 96 SO 81 7/24/08 C East of Pad A 0.0 5 113.8 118.0 13.8 13.0 96 SO 82 8/1/08 C East of Pad B 0.0 6 112.3 116.0 15.1 14.0 97 SO 83 8/1/08 C East of Pad B 0.0 6 112.8 116.0 14.8 14.0 97 SO 84 8/1/08 C East of Pad B 0.0 6 113.5 116.0 14.9 14.0 98 SO 85 8/1/08 C East of Pad B 0.0 6 112.5 116.0 14.0 14.0 97 SO 86 8/4/08 C East of Pad B 0.0 6 111.5 116.0 15.4 14.0 96 SO 87 8/4/08 C East of Shop A 0.0 6 111.0 116.0 14.9 14.0 96 SO 88 8/4/08 C North of Shop B 0.0 6 112.8 116.0 14.0 14.0 97 SO 89 8/4/08 C North of Shop C 0.0 6 110.9 116.0 15.6 14.0 96 SO 90 8/4/08 C North of Shop C 0.0 6 110.5 116.0 15.2 14.0 95 SO 91 8/4/08 C East of Shop C 0.0 6 112.0 116.0 14.9 14.0 97 SO 92 8/6/08 C East of Pad B 0.0 6 109.8 116.0 15.5 14.0 95 SO 93 8/6/08 C East of Pad B 0.0 6 110.7 116.0 15.2 14.0 95 SO 94 8/6/08 C East of Pad B 0.0 6 110.3 116.0 14.5 14.0 95 SO 95 8/6/08 C East of Pad B 0.0 6 111.4 116.0 15.3 14.0 96 Project Number: 971009-050 Project Name: LNRlBressi Project Location: 0 Client: 0 Page 3 of 7 6/8/20 1:19:56PM - - - - - - - - - - - - - - - - - - - SUMMARY OF FIELD DENSITY TESTS Test Test Test Location Test Soil Dry Density Moisture (%) Relative (%) No. Date Of Lot # Elev (ft) Type Field Max Field Opt. Compaction Remarks SO 96 8/11/08 DA Driveway Entrance from Gateway Rd. 0.0 5 113.8 118.0 13.9 13.0 96 SG 97 8/11/08 DA Driveway Entrance from Gateway Rd. 0.0 5 114.6 118.0 14.7 13.0 97 SO 98 8/12/08 DA Driveway Entrance from Finnila Pi. 0.0 2 113.3 116.0 15.2 14.0 98 SG 99 8/12/08 DA Driveway Entrance from Finnila P1. 0.0 2 112.8 116.0 15.8 14.0 97 SG 100 8/13/08 .P South of Shop O from FinnilaPi. 0.0 9 101.2 112.0 15.0 15.5 90 Retest on IOOA SG 100A 8/13/08 P South of Shop G from Finnila Pi. 0.0 9 108.2 112.0 16.9 15.5 97 Retest of 100 SG 101 8/13/08 P South of Shop G from Finnila Pi. 0.0 9 107.9 112.0 15.9 15.5 96 SO 102 8/13/08 P South of Shop G from FinnilaPl. 0.0 9 107.0 112.0 16.8 15.5 96 SO 103 8/13/08 ST South of Shop G from Finnila Pt. 0.0 9 106.8 112.0 15.6 15.5 95 SO 104 8/13/08 ST South of Shop G from Finnila P1. 0.0 9 106.8 112.0 16.7 15.5 95 SG 105 8/13/08 ST South of Shop 0 from Finnila P1. 0.0 9 107.5 112.0 16.2 15.5 96 SO 106 8/13/08 ST North of Major A 0.0 9 106.2 112.0 16.8 15.5 95 SO 107 8/13/08 ST North of Major A 0.0 9 106.8 112.0 16.7 15.5 95 SG 108 8/13/08 ST North of Major A 0.0 9 108.3 112.0 16.3 15.5 97 50 109 8/15/08 P NW of Major A 0.0 6 109.9 116.0 14.7 14.0 95 SG 110 8/15/08 P NW of Major A 0.0 6 109.9 116.0 14.2 14.0 95 50 111 8/15/08 P NW of Major A 0.0 6 109.9 116.0 14.0 14.0 95 SO 112 8/15/08 P Sof Shop F 0.0 6 110.4 116.0 14.8 14.0 95 SG 113 8/15/08 P Sof Shop F 0.0 6 109.8 116.0 14.3 14.0 95 SG 114 8/15/08 P Sof Shop F 0.0 6 111.3 116.0 14.3 14.0 96 50 115 8/15/08 P 5 of Shop F 0.0 6 113.5 116.0 14.3 14.0 98 50 116 8/15/08 P Sof Shop F 0.0 6 111.0 116.0 14.7 14.0 96 50 117 8/15/08 P Sof Shop F 0.0 6 109.9 116.0 14.6 14.0 95 50 118 8/15/08 P Sof Shop F 0.0 6 109.9 116.0 14.9 14.0 95 50 119 8/15/08 P Sof Shop F 0.0 6 110.8 116.0 14.8 14.0 96 50 120 8/20/08 P Eof Pad B 0.0 6 110.5 116.0 14.9 14.0 95 SG 121 8/20/08 P Eof Pad B 0.0 6 111.6 116.0 15.2 14.0 96 SO 122 8/20/08 P Eof Pad B 0.0 6 110.4 116.0 15.7 14.0 95 50 123 8/20/08 P . Eof Pad B 0.0 6 111.3 116.0 14.3 14.0 96 SO 125 8/20/08 P Eof Pad B 0.0 6 112.7 116.0 14.2 14.0 97 SO 126 8/20/08 P Eof Pad B 0.0 6 111.8 116.0 14.0 14.0 96 50 127 8/20/08 P Eof Pad B 0.0 6 110.8 116.0 14.8 14.0 96 Project Number: Project Name: Project Location: Client: 971009-050 LN R/Bressi 0 0 Page 4 of 7 4r- 1 P 6/8/20 1:19:56PM - - - - - - - - == - - - - - - - - - SUMMARY OF FIELD DENSITY TESTS Test Test Test Location Test Soil Dry Density Moisture (%) Relative (%) No. Date Of Lot # Elev (ft) Type Field Max Field Opt. Compaction Remarks SG 128 8/20/08 P Eof Shop A 0.0 6 110.4 116.0 14.3 14.0 95 SO 129 8/20/08 p Nof Shop B 0.0 6 112.7 116.0 14.0 14.0 97 SG 130 8/20/08 p Nof Shop B 0.0 6 110.0 116.0 14.7 14.0 95 SO 131 8/20/08 P Nof Shop B 0.0 6 111.6 116.0 14.5 14.0 96 SO 132 8/20/08 p Nof Shop C 0.0 6 109.8 116.0 14.8 14.0 95 SO 133 8/20/08 SW Eof Shop C 0.0 6 111.0 116.0 15.5 14.0 96 SO 134 8/20/08 SW NEof Shop C 0.0 6 113.5 116.0 15.3 14.0 98 SG 135 8/20/08 SW SWof Shop F 0.0 6 106.6 116.0 14.7 14.0 92 SG 136 8/20/08 SW Wof Shop F 0.0 6 106.2 116.0 14.8 14.0 92 SO 137 8/20/08 P Nof Major A 0.0 2 110.8 116.0 15.2 14.0 96 SG 138 8/22/08 P Nof Major A 0.0 2 111.3 116.0 14.8 14.0 96 So 139 8/22/08 p Nof Major A 0.0 2 111.2 116.0 15.3 14.0 96 SG 140 8/22/08 P Nof Major A 0.0 2 110.9 116.0 15.0 14.0 96 SO 141 8/22/08 P Nof Major A 0.0 2 111.8 116.0 15.8 14.0 96 SO 142 8/22/08 P Nof Major A 0.0 2 113.4 116.0 14.7 14.0 98 50 143 8/22/08 p N of Major A 0.0 2 112.5 116.0 14.5 14.0 97 SO 144 8/22/08 p N of Major A 0.0 2 110.9 116.0 14.0 14.0 96 SO 145 8/22/08 p Eof Pad A 0.0 2 111.2 116.0 15.3 14.0 96 SO 146 8/22/08 P Eof Pad A 0.0 2 111.0 116.0 15.2 14.0 96 SO 147 8/25/08 ST Nof Major C 0.0 2 113.8 116.0 15.3 14.0 98 SO 148 8/25/08 P Nof Major C 0.0 2 110.7 116.0 15.8 14.0 95 50 149 8/25/08 P Nof Major C 0.0 2 110.9 116.0 14.7 14.0 96 SO 150 8/27/08 P Sof Shop D 0.0 5 113.5 118.0 14.2 13.0 96 SO 151 8/27/08 P Sof Shop D 0.0 5 113.0 118.0 13.8 13.0 96 SO 152 8/27/08 P Sof Shop D 0.0 5 114.7 118.0 13.5 13.0 97 SO 153 8/27/08 P Sof Shop D 0.0 5 112.9 118.0 14.5 13.0 96 50 154 8/27/08 P Sof Shop D 0.0 5 112.8 118.0 14.2 13.0 96 SO 155 8/27/08 P Sof Shop D 0.0 5 114.5 118.0 14.3 13.0 97 50 156 8/27/08 p Sof Shop D 0.0 5 114.3 118.0 14.6 13.0 97 SO 157 8/27/08 ST Eof Shop D 0.0 4 109.2 113.0 16.4 16.0 97 SO 158 8/27/08 ST Eof Shop D 0.0 4 108.5 113.0 16.2 16.0 96 SO 159 8/27/08 ST Eof Shop D 0.0 4 108.0 113.0 17.8 16.0 96 Project Number: 971009-050 Project Name: LNRlBressi Project Location: 0 Client: 0 Page of 6/8/20 1:19:56PM - - - - - - - - MM - - MM - - - - SUMMARY OF FIELD DENSITY TESTS Test Test Test Location Test Soil Dry Density Moisture (%) Relative (%) No. Date Of Lot # Elev (ft) Type Field Max Field Opt. Compaction Remarks SO 160 8/27/08 P Sof Major B 0.0 4 107.4 113.0 16.4 16.0 95 SG 161 8/27/08 P Sof Major B 0.0 4 108.2 113.0 16.0 16.0 96 SG 162 8/27/08 P Sof Major B 0.0 4 108.5 113.0 16.6 16.0 96 SG 163 8/27/08 P S of Major B 0.0 4 109.9 113.0 16.5 16.0 97 SG 164 8/27/08 P Sof Major B 0.0 4 110.4 113.0 16.3 16.0 98 SG 165 8/27/08 P s of Major B 0.0 4 108.5 113.0 16.7 16.0 96 SG 166 9/22/08 P Major 0 0.0 4 110.2 113.0 16.6 16.0 98 SG 167 10/7/08 p Sof Shop E 0.0 5 112.7 118.0 14.2 13.0 96 SG 168 10/7/08 P Sof Shop E 0.0 5 112.9 118.0 13.8 13.0 96 SG 169 10/7/08 P Sof Shop E 0.0 5 113.4 118.0 13.5 13.0 96 SG 170 10/22/08 DA SEntrance 0.0 5 113.5 118.0 14.8 13.0 96 SG 171 10/22/08 DA S Entrance 0.0 5 112.7 118.0 14.1 13.0 96 SG 172 10/31/08 p NEof Major C 0.0 5 111.8 118.0 13.8 13.0 95 SG 173 10/31/08 P NEof Major C 0.0 5 112.7 118.0 12.9 13.0 96 SO 174 10/31/08 p NEof Major C 0.0 5 113.0 118.0 13.5 13.0 96 SO 175 10/31/08 p NEof Major C 0.0 5 113.8 118.0 13.8 13.0 96 SO 176 10/31/08 p NEof Major C 0.0 5 112.7 118.0 13.0 13.0 96 SG 177 12/29/08 D Front NW Major A 0.0 7 107.3 111.5 18.8 17.5 96 SO 178 12/29/08 D Driveway to Bressi Ranch Way 0.0 4 107.1 113.0 18.3 16.0 95 SG 179 1/2/09 PL Stater Bros W Side 0.0 6 109.8 116.0 18.9 14.0 95 SG 180 1/2/09 D Stater Bros S Side 0.0 6 110.1 116.0 15.4 14.0 95 SG 181 1/2/09 D Stater Bros W Side 0.0 6 110.8 116.0 16.3 14.0 96 SG 182 1/5/09 D Major A E Side 0.0 6 110.9 116.0 15.4 14.0 96 SO 183 1/5/09 PL Major A E Side 0.0 6 110.3 116.0 16.3 14.0 95 SG 184 1/5/09 D Major AESide 0.0 6 114.1 116.0 12.9 14.0 98 SO 185 1/5/09 D Major AESide 0.0 6 111.6 116.0 14.2 14.0 96 SO 186 1/5/09 D Major ASSide 0.0 6 113.6 116.0 12.8 14.0 98 SO 187 1/5/09 D Major AS Side 0.0 6 110.8 116.0 16.1 14.0 96 SO 188 1/5/09 PL Major AS Side 0.0 6 111.7 116.0 14.3 14.0 96 SO 189 1/5/09 D Major A S Side 0.0 6 112.3 116.0 14.9 14.0 97 SG 190 1/5/09 PL Major A W Side 0.0 6 112.8 116.0 15.4 14.0 97 SG 191 1/5/09 D Major AWSide 0.0 6 111.1 116.0 15.8 14.0 96 Project Number: 971009-050 Project Name: LNR/Bressi Project Location: 0 Client: 0 Page 6of7 6/8/20 1:19:56PM - - - - - - - - - - - - - - - - - - - SUMMARY OF FIELD DENSITY TESTS Test Test Test Location Test Soil Dry Density Moisture (%) Relative (%) No. Date Of Lot # Elev (ft) Type Field Max Field Opt. Compaction Remarks SG 192 1/5/09 D Major A W Side 0.0 6 111.3 116.0 14.3 14.0 96 SG 193 1/5/09 D Major AWSide 0.0 6 110.9 116.0 15.1 14.0 96 SG 194 1/5/09 PL Major A W Side 0.0 6 112.1 116.0 15.8 14.0 97 SG 195 1/5/09 PL Major A W Side 0.0 6 113.2 116.0 13.9 14.0 98 Project Number: 971009-050 . . . Project Name: LNR/Bressi Project Location: 0 Client: 0 Page 7 of 7 6/8/20 1:19:56PM - - - - - - - - - - - - - - on - - - - SUMMARY OF FIELD DENSITY TESTS Test No. Test Date Test Of Location Test Lot # Elev (ft) Soil Type Dry Density Field Max Moisture (%) Field Opt. Relative (%) Compaction Remarks S 1 3/19/08 M Line SP3 Station 13+45 403.0 6 104.8 116.0 16.4 14.0 90 S 2 3/19/08 M Line SP3 Station 13+35 404.0 6 106.7 116.0 15.7 14.0 92 5 3 3/19/08 M Line SP3 Station 13+30 406.0 1 103.3 110.0 19.1 17.0 94 S 4 3/19/08 M Line SP3 Station 13+40 408.0 1 102.9 110.0 18.5 17.0 94 5 5 3/20/08 M Line SF1 Station 10+50 405.0 7 102.5 111.5 19.3 17.5 92 S 6 3/20/08 M Line SP Station 11+20 407.0 7 101.7 111.5 19.1 17.5 91 S 7 3/20/08 M Line SP Station 11+45 405.0 7 101.0 111.5 18.9 17.5 91 5 8 3/21/08 M Line SP Station 12+00 407.0 7 101.5 111.5 20.2 17.5 91 S 9 3/21/08 M Line SP Station 12+35 405.0 7 103.6 111.5 17.5 17.5 93 S 10 3/21/08 M Line SF! Station 12+60 408.0 7 101.7 111.5 19.3 17.5 91 S 11 3/21/08 M Pad 404.0 7 101.8 111.5 19.6 17.5 91 S 12 3/21/08 M Pad 407.5 7 101.2 111.5 18.8 17.5 91 5 13 3/26/08 M ElFuerte Station 16+70 371.0 3 107.3 116.0 15.8 13.5 93 S 14 3/26/08 M El Fuerte Station 16+65 372.0 3 108.6 116.0 14.4 13.5 94 S 15 3/26/08 M ElFuerte Station 16+72 373.0 3 105.8 116.0 15.1 13.5 91 S 16 3/26/08 M ElFuerte Station 16+30 375.0 3 105.9 116.0 13.9 13.5 91 S 17 3/26/08 M ElFuerte Station 16+20 375.0 3 108.7 116.0 14.1 13.5 94 S 18 3/26/08 M Line S3 Station 14+45 394.0 1 102.8 110.0 20.6 17.0 93 S 19 3/26/08 M Line S3 Station 14+65 396.0 1 100.8 110.0 20.4 17.0 92 5 20 3/26/08 M Line S3 Station 14+85 399.0 1 100.5 110.0 19.3 17.0 91 S 21 3/26/08 M Line S3 Station 15+05 402.0 1 101.3 110.0 19.6 17.0 92 S 22 4/4/08 M Line S4 Station 15+20 402.0 1 101.8 110.0 19.8 17.0 93 S 23 4/4/08 tvIH Manhole #4 Station 15+32 390.0 1 101.0 110.0 20.6 17.0 92 S 24 4/4/08 MI-I Manhole #4 Station 15+38 392.0 1 103.8 110.0 20.1 17.0 94 S 25 4/4/08 MH Manhole #4 Station 15+35 394.0 1 101.7 11.0.0 20.8 17.0 92 S 26 4/4/08 MH Manhole #4 Station 15+40 398.0 1 100.8 110.0 19.3 17.0 92 S 27 4/4/08 MH Manhole #4 Station 15+42 401.0 1 100.5 110.0 20.1 17.0 91 S 28 4/4/08 M Line S5 Station 15+50 390.0 1 103.7 110.0 20.8 17.0 94 5 29 4/4/08 M Line S5 Station 15+59 392.0 1 102.5 110.0 18.8 17.0 93 S 30 4/4/08 M Line S5 Station 15+70 394.0 1 103.0 110.0 20.2 17.0 94 S 31 4/4/07 M Line S5 Station 15+75 399.0 1 103.0 110.0 19.9 17.0 94 S 32 4/4/07 M Line S5 Station 15+50 402.0 1 103.7 110.0 18.8 17.0 94 Project Number: 971009-050 0 Project Name: LNR/Bressi Project Location: 0 Client: 0 Page 1 of 5 6/8/20 1:14:00PM - - - - - - - - - on - - - - - - - - - SUMMARY OF FIELD DENSITY TESTS Test Test Test Location Test Soil Dry Density Moisture (%) Relative (%) No. Date Of Lot # Elev (ft) Type Field Max Field Opt. Compaction Remarks S 33 4/4/07 M Line S5 Station 15+62 403.0 1 101.0 110.0 19.1 17.0 92 S 34 4/4/07 M Line S5 Station 15+71 402.0 1 101.7 110.0 18.6 17.0 92 S 35 4/7/07 MH Manhole #4 Station 15+58 387.0 1 103.7 110.0 18.0 17.0 94 S 36 4/7/08 MB Manhole #4 Station 15+49 390.0 1 105.7 110.0 17.8 17.0 96 5 37 4/7/08 MH Manhole #4 Station 15+49 393.0 1 101.5 110.0 18.1 17.0 92 S 38 4/7/08 MH Manhole #4 Station 15+69 396.0 1 101.9 110.0 18.8 17.0 93 S 39 4/7/08 MH Manhole #4 Station 15+63 400.0 1 100.9 110.0 19.6 17.0 92 5 40 4/7/08 MH Manhole #4 Station 15+50 385.0 1 102.7 110.0 19.3 17.0 93 S 41 4/7/08 MH Line S5 Station 15+60 390.0 1 101.8 110.0 18.6 17.0 93 S 42 4/7/08 M Line S5 Station 15+75 383:0 4 103.8 113.0 17.9 16.0 92 S 43 4/7/08 M Line S5 Station 15+80 385.0 4 103.5 113.0 17.4 16.0 92 S 44 4/7/08 M Line S5 Station 15+90 379.0 4 101.7 113.0 16.8 16.0 90 S 45 4/7/08 M Line S5 Station 15+92 374.5 4 103.6 113.0 17.8 16.0 92 S 46 4/7/08 M Line S5 Station 16+00 378.0 4 102.9 113.0 16.5 16.0 91 S 47 4/7/08 M Line S5 Station 16+10 377.0 4 103.5 113.0 17.8 16.0 92 5 48 4/7/08 M Line SP19 Station 19+10 395.0 4 101.9 113.0 18.2 16.0 90 S 49 4/7/08 M Line SP19 Station 19+20 402.0 4 101.8 113.0 18.7 16.0 90 S 50 4/8/08 M Line SP 18 Station 19+40 397.0 2 103.7 116.0 14.9 14.0 89 Retest on 50A S 50A 4/8/08 M Line SPI8 Station 19+40 397.0 2 105.8 116.0 15.7 14.0 91 Retest of 50 S 51 4/8/08 M Line SP 18 Station 19+75 400.0 2 101.9 116.0 13.7 14.0 88 Retest on 5 1 A S 51A 4/8/08 M Line SP 18 Station 19+75 400.0 2 105.2 116.0 16.2 14.0 91 Retest of5l S 52 4/8/08 M Line SP 18 Station 20+00 398.0 2 104.2 116.0 15.8 14.0 90 S 53 4/8/08 M Line SP19 Station 20+35 401.0 2 108.0 116.0 14.7 14.0 93 S 54 4/8/08 M Line SP19 Station 20+65 400.0 2 108.8 116.0 14.5 14.0 94 S 55 4/8/08 M Line Station 14+20 398.0 6 105.7 116.0 15.8 14.0 91 S 56 4/8/08 M Line B Station 13+90 401.0 6 105.8 116.0 16.5 14.0 91 S 57 4/8/08 M Line B Station 13+60 399.0 6 107.3 116.0 16.1 14.0 93 S 58 4/9/08 M Line Station 12+50 401.0 6 105.7 116.0 15.2 14.0 91 S 59 4/9/08 M Line B Station 12+20 404.0 6 108.0 116.0 16.7 14.0 93 S 60 4/9/08 M Line Station 12+00 400.0 6 105.8 116.0 16.3 14.0 91 S 61 4/9/08 M Line Station 11+30 404.0 6 105.5 116.0 16.2 14.0 91 S 62 4/9/08 M Line B Station 11+25 402.0 6 104.9 116.0 15.7 14.0 90 Project Number: 971009-050 Project Name: LNRlBressl Project Location: 0 Client: 0 Page 2of5 6/8/20 1:14:00PM - - - - mm - - - - - - - M" - mm - SUMMARY OF FIELD DENSITY TESTS Test Test Test Location Test Soil Dry Density Moisture (%) Relative (%) No. Date Of Lot # Elev (ft) Type Field Max Field Opt. Compaction Remarks S 63 4/9/08 M Line B Station 11+05 404.5 6 107.2 116.0 16.4 14.0 92 S 64 4/9/08 M Line B Station 10+75 402.0 6 107.6 116.0 15.9 14.0 93 5 65 4/9/08 M Line B Station 10+45 404.0 6 109.4 116.0 14.7 14.0 94 S 66 4/9/08 M Line B Station 10+10 406.0 6 105.0 116.0 16.3 14.0 91 S 67 4/10/08 MH Line S2 Station 12+55 396.0 4 102.7 113.0 19.5 16.0 91 S 68 4/10/08 MH Manhole #3 Station 12+75 397.0 4 102.8 113.0 18.5 16.0 91 S 69 4/10/08 MH Manhole #3 Station 12+60 399.0 4 101.8 113.0 18.6 16.0 90 S 70 4/10/08 MH Manhole #3 Station 12+71 401.0 2 105.7 116.0 15.7 14.0 91 S 71 4/10/08 MH Manhole #3 Station 12+60 403.0 2 105.9 116.0 14.9 14.0 91 S 72 4/10/08 MH Manhole #3 Station 10+00 398.0 6 104.8 116.0 18.2 14.0 90 5 73 4/10/08 MH Manhole #1 Station 9+90 399.0 6 106.8 116.0 16.9 14.0 92 5 74 4/10/08 MH Manhole #1 Station 10+05 402.0 6 106.2 116.0 16.0 14.0 92 S 75 4/10/08 MH Manhole #1 Station 10+10 404.0 6 100.3 116.0 14.2 14.0 86 Retest on 75A S 75A 4/10/08 MH Manhole #1 Station 10+10 404.0 6 108.2 116.0 16.8 14.0 93 Retest of 75 S 76 4/10/08 M Line Station 11+40 402.0 6 106.8 116.0 16.2 14.0 92 S 77 4/10/08 M Line C Station 10+90 404.0 6 105.2 116.0 15.7 14.0 91 S 78 4/10/08 M Line C Station 10+50 405.0 6 105.7 116.0 15.6 14.0 91 S 79 4/10/08 L Shop Station 10+36 404.0 6 105.8 116.0 16.8 14.0 91 S 80 4/10/08 L Shop Station 10+36 406.0 5 109.2 118.0 15.7 13.0 93 S 81 4/10/08 L Shop Station 10+36 405.0 5 110.8 118.0 14.5 13.0 94 S 82 4/10/08 L Shop Station 10+36 403.0 5 110.5 118.0 14.0 13.0 94 S 83 4/10/08 L Shop Station 10+50 405.0 5 110.8 118.0 16.7 13.0 94 S 84 4/11/08 M Line C Station 11+80 403.0 2 108.3 116.0 16.8 14.0 93 5 85 4/11/08 M Line C Station 12+20 405.0 2 110.9 116.0 15.5 14.0 96 S 86 4/11/08 M Line C Station 12+45 402.0 2 110.8 116.0 16.3 14.0 96 5 87 4/11/08 M Line C Station 12+70 404.0 2 108.5 116.0 16.0 14.0 94 S 88 4/11/08 M Line C Station 12+90 405.0 2 109.3 116.0 14.9 14.0 94 S 89 4/14/08 M Line Station 41+65 400.0 2 109.3 116.0 14.5 14.0 94 S 90 4/14/08 M Line Station 11+40 404.0 2 107.7 116.0 16.9 14.0 93 5 91 4/14/08 M Line Station 10+90 401.0 6 105.5 116.0 16.9 14.0 91 S 92 4/14/08 M Line Station 10+50 404.0 6 105.2 116.0 14.8 14.0 91 S 93 4/14/08 M Line C Station 10+30 401.0 6 106.8 116.0 15.2 14.0 92 Project Number: 971009-050 Project Name: LNRlBressi Project Location: 0 Client: 0 Page 3of5 6//20 1:14:00PM - .- - - - - - - - a. - - - - a. - SUMMARY OF FIELD DENSITY TESTS Test Test Test Location Test Soil Dry Density Moisture (%) Relative (%) No. Date Of Lot # Elev (ft) Type Field Max Field Opt. Compaction Remarks S 94 4/14/08 M Line C Station 10+20 403.0 6 107.7 116.0 15.8 14.0 93 S 95 4/15/08 MH Line S9/M}{#6 Station 13+00 338.5 4 102.8 113.0 18.2 16.0 91 S 96 4/15/08 MH Line S9/MH #6 Station 13+05 401.0 4 103.5 113.0 18.0 16.0 92 S 97 4/15/08 MH Line S9/MB #6 Station 12+95 403.0 4 103.8 113.0 18.8 16.0 92 S 98 4/15/08 MH Line S9/MH #6 Station 12+98 405.0 4 104.9 113.0 16.9 16.0 93 S 99 4/15/08 MH Line S11/MH #8 Station 10+45 400.0 6 102.2 116.0 17.9 14.0 88 S 99A 4/15/08 MH Line SII/MH #8 Station 10+45 400.0 6 107.9 116.0 15.2 14.0 93 S 100 4/15/08 MH Line Sll/MH#8 Station 10+36 402.0 6 104.5 116.0 16.7 14.0 90 S 101 4/15/08 MH Line SII/MH #8 Station 10+54 404.0 6 104.8 116.0 16.0 14.0 90 5 102 4/15/08 MH Line S11/MH #8 Station 10+30 405.5 6 108.2 116.0 14.5 14.0 93 S 103 4/16/08 MH Line S131MH#9 Station 10+00 397.0 6 105.5 116.0 15.8 14.0 91 5 104 4/16/08 MH Line S1311\4H #9 Station 10+00 399.0 6 107.6 116.0 16.9 14.0 93 S 105 4/16/08 MI-I Line S13fM}1#9 Station 9+98 402.0 6 105.0 116.0 14.7 14.0 91 S 106 4/16/08 MH Line 513/MH#9 Station 10+05 404.5 6 105.7 116.0 14.9 14.0 91 S 107 4/16/08 M Line Station 15+35 401.0 6 108.0 116.0 16.0 14.0 93 5 108 4/16/08 M Line C Station 15+20 404.0 6 105.9 116.0 16.2 14.0 91 S 109 4/16/08 M Line C Station 15+50 405.0 6 107.3 116.0 16.9 14.0 93 S 110 4/17/08 M Line C Station 15+90 400.0 1 102.5 110.0 20.2 17.0 93 S 111 4/17/08 M Line Station 16+15 403.0 1 101.9 110.0 19.8 17.0 93 S 112 4/17/08 M Line C Station 16+50 405.0 1 101.0 110.0 19.2 17.0 92 S 113 4/17/08 L Shop Station 15+97 404.0 1 102.0 110.0 19.2 17.0 93 S 114 4/17/08 L Shop Station 15+97 405.0 1 103.7 110.0 18.5 17.0 94 S 115 4/17/08 L Shop Station 16+41 403.0 1 103.6 110.0 18.0 17.0 94 S 116 4/17/08 L Shop Station 16+41 405.0 1 103.0 110.0 19.4 17.0 94 S 117 4/21/08 M Line Station 15+10 402.0 9 103.8 112.0 18.2 15.5 93 S 118 4/21/08 M Line Station 14+85 405.0 9 100.8 112.0 17.6 15.5 90 S 119 4/21/08 L Shop Station 14+59 401.0 9 100.9 112.0 17.5 15.5 90 S 120 4/21/08 M Line Station 14+45 404.0 9 102.7 112.0 18.4 15.5 92 S 121 4/21/08 L Shop F Station 14+28 404.0 9 100.8 112.0 17.2 15.5 90 5 122 4/21/08 M Line C Station 14+20 402.0 9 103.6 112.0 17.7 15.5 93 S 123 4/21/08 M Line Station 14+00 404.0 9 105.7 112.0 16.6 15.5 94 S 124 4/21/08 L Shop F Station 13+92 403.0 9 104.3 112.0 17.1 15.5 93 Retest on 99A Retest of 99 I Project Number: 971009-050 Project Name: LNR/Bressi Project Location: 0 Aft Client: 0 Page 4 of 5 VO 6/8/20 1:14:00PM -. -, - - .- SUMMARY OF FIELD DENSITY TESTS Test No. Test Date Test Of Location Test Lot # Elev (ft) Soil Type Dry Density Field Max Moisture (%) Field Opt. Relative (%) Compaction Remarks S 125 4/24/08 M Line Station 12+70 401.0 4 102.9 113.0 18.5 16.0 91 S 126 4/24/08 L Shop C Station 12+34 404.0 4 102.7 113.0 17.8 16.0 91 S 127 4/24/08 M Line Station 11+90 405.0 4 101.8 113.0 16.9 16.0 90 S 128 4/24/08 M Line Station 11+40 406.0 4 104.9 113.0 18.1 16.0 93 S 129 4/24/08 M Line Station 11+10 404.0 4 103.8 113.0 18.0 16.0 92 S 130 4/24/08 L Shop A Station 10+81 405.0 4 102.8 113.0 17.9 16.0 91 S 131 4/24/08 M Line Station 10+55 407.0 4 102.0 113.0 18.5 16.0 90 5 132 4/24/08 L Shop A Station 10+42 406.0 4 103.8 113.0 17.7 16.0 92 S 133 5/27/08 North of Shop B Station 11+12 404.0 4 102.8 113.0 17.5 16.0 91 S 134 5/27/08 North of Shop B Station 11+12 404.0 4 102.5 113.0 18.1 16.0 91 5 135 5/27/08 North of Shop B Station 11+12 406.0 4 103.6 113.0 18.0 16.0 92 S 136 5/30/08 South of Shop F Station 14+28 402.0 6 106.7 116.0 15.8 14.0 92 S 137 5/30/08 South of Shop F Station 14+28 403.0 6 106.3 116.0 15.0 14.0 92 5 138 5/30/08 South of Shop F Station 14+28 405.0 6 105.8 116.0 14.7 14.0 91 S 139 5/30/08 South of Shop F Station 14+28 405.0 6 105.0 116.0 15.2 14.0 91 S 140 6/2/08 South of Shop Station 16+52 402.5 6 106.2 116.0 16.2 14.0 92 S 141 6/2/08 South of Shop Station 16+52 404.0 6 106.2 116.0 15.5 14.0 92 S 142 6/2/08 South of Shop G Station 16+52 406.0 6 108.5 116.0 1.5 14.0 94 S 143 6/3/08 South of Shop D Station 10+67 401.0 6 104.9 116.0 15.9 14.0 90 S 144 6/3/08 South of Shop D Station 10+67 402.0 6 106.6 116.0 16.7 14.0 92 S 145 6/3/08 South of Shop D Station 10+67 404.0 6 107.7 116.0 16.0 14.0 93 S 146 6/3/08 South of Shop D Station 10+67 404.5 6 107.0 116.0 16.2 14.0 92 Project Number: 971009-050 Project Name: LNR/Bressi Project Location: 0 Client: 0 Page 5of5 . 6/8/20 1:14:00PM SUMMARY OF FIELD DENSITY TESTS Test No. Test Date Test Of Location Test Lot # Elev (ft) Soil Type Dry Density Field Max Moisture (%) Field Opt. Relative (%) Compaction Remarks JT 1 4/30/08 M Line A Station 5+60 408.5 4 102.8 113.0 17.9 16.0 91 JT 2 4/30/08 M Line Station 4+95 406.0 4 102.5 113.0 16.6 16.0 91 JT 3 4/30/08 M Line A Station 4+20 407.0 4 101.9 113.0 18.2 16.0 90 JT 4 4/30/08 M Line Station 3+50 406.0 4 103.7 113.0 17.2 16.0 92 JT 5 4/30/08 M Line Station 2+60 405.5 4 103.5 113.0 17.5 16.0 92 JT 6 5/1/08 M Line Station 2+00 403.5 4 101.8 113.0 16.6 16.0 90 JT 7 5/1/08 M Line A Station 1+50 404.0 4 102.5 113.0 18.1 16.0 91 JT 8 5/1/08 M Line A Station 1+00 404.0 4 103.6 113.0 18.5 16.0 92 JT 9 5/1/08 M Line Station 0+50 403.5 4 103.6 113.0 16.3 16.0 92 JT 10 6/6/08 M SWofMaiorA 400.0 4 103.5 113.0 18.4 16.0 92 JT 11 6/6/08 M SWofMajorA 400.0 4 102.9 113.0 17.2 16.0 91 JT 12 6/6/08 M SWofMajorA 400.0 4 101.9 113.0 16.5 16.0 90 JT 13 6/6/08 M S. ofMajorA 399.0 4 101.8 113.0 17.4 16.0 90 JT 14 6/9/08 M S. ofMajorA 400.0 4 103.2 113.0 16.9 16.0 91 JT 15 6/9/08 M S. ofMajorA 399.5 4 103.7 113.0 17.4 16.0 92 JT 16 6/9/08 M S. ofMajorA 400.0 4 102.9 113.0 17.8 16.0 91 JT 17 6/12/08 M S. ofMajorA 397.0 5 109.2 118.0 15.5 13.0 93 JT 18 6/12/08 M S. of Maim A 399.0 5 110.4 118.0 14.8 13.0 94 JT 19 6/12/08 M W.ofMajorA 397.0 5 109.9 118.0 15.7 13.0 93 JT 20 6/12/08 M W. ofMajorA 398.0 5 109.8 118.0 15.6 13.0 93 JT 21 6/12/08 M W.ofMajorA 402.0 4 102.7 113.0 18.1 16.0 91 JT 22 6/19/08 M SWofMajorA 403.0 4 104.5 113.0 17.5 16.0 92 JT 23 6/19/08 M S. of Shot) E 402.0 4 103.2 113.0 17.4 16.0 91 JT 24 6/19/08 M S. ofMajorB 401.5 4 103.0 113.0 17.0 16.0 91 JT 25 6/19/08 M W.ofMajorB 403.0 4 102.7 113.0 18.3 16.0 91 JT 26 6/19/08 M W. of Major B 404.0 4 104.5 113.0 17.8 16.0 92 JT 27 6/19/08 M SEof Shot) D 404.0 6 108.2 116.0 16.5 14.0 93 JT 28 6/19/08 M E.of Shop D 405.0 6 108.0 116.0 15.9 14.0 93 JT 29 6/19/08 M E. of Shop D 405.0 6 107.3 116.0 16.2 14.0 93 JT 30 6/19/08 M S.of Shop D 405.0 6 107.1 116.0 16.8 14.0 92 JT 31 6/30/08 M E. of Shop G 506.0 6 106.9 116.0 16.0 14.0 92 JT 32 6/30/08 M E.of Shoo G 406.0 6 108.2 116.0 15.2 14.0 93 Project Number: 971009-050 Project Name: LNRIBressi Project Location: 0 Client: 0 Pane 1 of 2 8/22/2 3:25:43PM SUMMARY OF FIELD DENSITY TESTS Test No. Test Date Test Location Of Test Lot # Elev (ft) Soil Type Dry Density Field Max Moisture (%) Field Opt. Relative (%) Compaction Remarks JT 33 7/1/08 M S. of Shop G 404.5 6 109.2 116.0 14.9 14.0 94 JT 34 7/1/08 M S.W. of Shop G 405.0 6 107.9 116.0 16.9 14.0 93 JT 35 7/1/08 M S.W.of Shop G 405.0 6 106.4 116.0 16.4 14.0 92 JT 36 7/1/08 M S. of Shop F 405.5 6 106.0 116.0 16.0 14.0 91 JT 37 7/11/08 M E.of Shop C 405.0 6 108.2 116.0 15.8 14.0 93 JT 38 7/11/08 M E.of Shop C 405.0 6 106.4 116.0 16.1 14.0 92 JT 39 7/11/08 M N. of Shop C 403.5 6 105.7 116.0 16.4 14.0 91 JT 40 7/11/08 M N.of Shop C 403.0 6 106.8 116.0 15.5 14.0 92 JT 41 7/14/08 M W.of Shop F 404.0 6 105.0 116.0 16.0 14.0 91 JT 42 7/14/08 M W.of Shop F 404.5 6 105.1 116.0 15.7 14.0 91 JT 43 7/14/08 M W.of Shop F 404.0 6 105.1 116.0 14.5 14.0 91 JT 44 7/29/08 M N. of Shope C 405.0 6 105.7 116.0 16.2 14.0 91 JT 45 7/29/08 M N. of Shope C 406.0 6 105.1 116.0 15.9 14.0 91 JT 46 7/29/08 M Between Shops C&B 405.5 6 106.6 116.0 14.9 14.0 92 JT 47 7/29/08 M Between Shops C&B 405.0 6 107.0 116.0 16.7 14.0 92 JT 48 7/29/08 M E.of Pad B 405.5 6 105.9 116.0 16.3 14.0 91 JT 49 7/29/08 M E.of Pad B 406.0 6 105.5 116.0 15.5 14.0 91 JT 50 7/29/08 M N. of Pad B 408.0 6 107.6 116.0 15.0 14.0 93 Project Number: 971009-050 Project Name: LNR/Bressi Project Location: 0 Client: 0 Pane 2 of 2 8/22/2 3:25:43PM SUMMARY OF FIELD DENSITY TESTS Test Test Test Location Test Soil Dry Density Moisture (%) Relative (%) No. Date Of Lot # Elev (ft) Type Field Max Field Opt. Compaction Remarks W 1 4/3/08 M Line Station 12+90 405.0 5 108.7 118.0 15.5 13.0 92 W 2 4/3/08 M Line A Station 12+50 405.0 5 108.5 118.0 13.9 13.0 92 W 3 4/3/08 M Line Station 11+35 403.0 5 109.6 118.0 13.8 13.0 93 W 4 4/3/08 M Line Station 11+00 404.0 5 108.5 118.0 14.6 13.0 92 W 5 4/11/08 M Line Station 10+25 406.0 5 107.6 118.0 13.8 13.0 91 W 6 4/11/08 M Line Station 10+60 406.0 5 109.6 118.0 13.8 13.0 93 W 7 4/11/08 M Line A Station 11+80 403.5 5 109.4 118.0 14.6 13.0 93 W 8 4/11/08 M Line A Station 12+00 404.0 5 107.2 118.0 13.8 13.0 91 W 9 4/14/08 S Line B Station 16+65 373.5 8 124.6 133.5 10.8 9.0 93 W 10 4/14/08 S Line B Station 16+40 373.5 8 127.5 133.5 9.9 9.0 96 W 11 4/14/08 M Line Station 16+55 374.5 4 103.8 113.0 18.2 16.0 92 W 12 4/14/08 M Line Station 16+50 374.0 4 102.9 113.0 17.9 16.0 91 W 13 4/18/08 FS East of Pad Station 10+18 403.5 5 108.5 118.0 15.7 13.0 92 W 14 4/18/08 FS East of Pad A Station 10+18 404.0 5 109.6 118.0 15.2 13.0 93 W 15 4/21/08 WS Pad Station 10+41 404.0 5 107.6 118.0 14.8 13.0 91 W 16 4/21/08 WS Pad Station 10+41 404.0 5 107.2 118.0 15.3 13.0 91 W 17 4/22/08 M Finila Place Station 13+10 406.0 5 108.6 118.0 14.8 13.0 92 W 18 4/22/08 M Finila Place Station 13+30 406.0 5 108.5 118.0 15.2 13.0 92 W 19 5/6/08 M Line B Station 15+00 399.5 8 125.8 133.5 10.3 9.0 94 W 20 5/6/08 M Line B Station 14+50 399.0 8 122.3 133.5 9.8 9.0 92 W 21 5/6/08 M Line B Station 13+90 399.5 8 123.0 133.5 10.8 9.0 92 W 22 5/6/08 M Line B Station 13+50 400.0 8 123.5 133.5 10.5 9.0 93 W 23 5/6/08 M Line C Station 18+80 398.5 8 122.8 133.5 10.0 9.0 92 W 24 5/6/08 M Line C Station 18+50 399.0 8 121.0 133.5 9.9 9.0 91 W 25 5/6/08 M Line C Station 17+70 400.0 8 123.5 133.5 11.6 9.0 93 W 26 5/6/08 M Line C Station 17+00 400.5 8 124.7 133.5 9.8 9.0 93 W 27 5/6/08 M Line C Station 16+40 401.0 8 123.2 133.5 10.2 9.0 92 W 28 5/6/08 M Line C Station 15+50 402.0 8 122.3 133.5 10.7 9.0 92 W 29 5/7/08 M Line C Station 18+60 401.0 5 103.2 118.0 16.7 13.0 87 Retest on29A W 29A 5/7/08 M Line C Station 18+60 401.0 5 106.2 118.0 15.4 13.0 90 Retest of 29 W 30 5/7/08 M Line Station 18+20 400.0 5 108.8 118.0 14.8 13.0 92 W 31 5/7/08 M Line Station 17+50 402.0 5 108.2 118.0 14.2 13.0 92 Project Number: 971009-050 401, Project Name: LNRlBressi Project Location: 0 Client: 0 Page 1 of 5 49 8/25/2 8:45:18AM - - - M ,MWM,M - - Map -, - ,- - ..- - SUMMARY OF FIELD DENSITY TESTS Test Test Test Location Test Soil Dry Density Moisture (%) Relative (%) No. Date Of Lot # Elev (ft) Type Field Max Field Opt. Compaction Remarks W 32 5/7/08 M Line Station 16+85 403.0 5 108.0 118.0 15.7 13.0 92 W 33 5/7/08 M Line B Station 14+00 402.0 5 106.9 118.0 14.7 13.0 91 W 34 5/7/08 M Line Station 13+40 402.0 5 108.8 118.0 15.2 13.0 92 W 35 5/14/08 S Line Station 13+00 401.0 8 128.5 133.5 10.8 9.0 96 W 36 5/14/08 S Line B Station 11+90 402.0 8 124.2 133.5 10.0 9.0 93 W 37 5/14/08 S Line B Station 11+00 403.0 8 124.0 133.5 10.5 9.0 93 W 38 5/14/08 M Line Station 12+80 403.0 5 105.8 118.0 14.8 13.0 90 W 39 5/14/08 M Line Station 12+00 404.0 5 107.7 118.0 15.5 13.0 91 W 40 5/14/08 M Line B Station 11+50 404.0 5 107.0 118.0 15.0 13.0 91 W 41 5/14/08 M Line B Station 10+90 403.5 5 109.3 118.0 15.2 13.0 93 W 42 5/14/08 M Line Station 10+50 405.0 5 107.5 118.0 13.9 13.0 91 W 43 5/15/08 M Line Station 16+10 375.0 4 102.7 113.0 17.7 16.0 91 W 44 5/15/08 M Line Station 16+00 379.0 4 100.2 113.0 15.2 16.0 89 Retest on44A W 44A 5/15/08 M Line B Station 16+00 379.0 4 103.3 113.0 16.8 16.0 91 Retest of 44 W 45 5/15/08 M Line B Station 15+90 377.0 4 103.7 113.0 17.7 16.0 92 W 46 5/15/08 M Line B Station 15+80 386.0 4 104.5 113.0 17.0 16.0 92 W 47 5/15/08 M Line B Station 15+75 . 386.0 4 105.7 113.0 17.7 16.0 94 W 48 5/15/08 M Line B Station 15+70 390.0 4 104.8 113.0 16.8 16.0 93 W 49 5/15/08 M Line B Station 15+65 392.5 4 104.2 113.0 16.0 16.0 92 W 50 5/17/08 M Line Station 10+30 405.0 6 107.3 116.0 15.8 14.0 93 W 51 5/17/08 M Line Station 9+50 406.0 6 109.5 116.0 16.2 14.0 94 W 52 5/17/08 M Line B Station 9+00 406.0 6 109.2 116.0 14.9 14.0 94 W 53 5/17/08 M Line Station 8+40 407.0 6 107.8 116.0 14.9 14.0 93 W 54 5/20/08 M Line C Station 16+50 404.0 6 107.8 116.0 15.8 14.0 93 W 55 5/20/08 M Line Station 15+40 403.0 6 107.3 116.0 15.0 14.0 93 W 56 5/20/08 M Line C Station 14+60 405.0 6 105.5 116.0 15.9 14.0 91 W 57 5/20/08 M Line Station 14+00 404.0 6 105.8 116.0 14.5 14.0 91 W 58 5/20/08 M Line Station 13+40 405.0 6 105.0 116.0 15.7 14.0 91 W 59 5/20/08 M Line Station 12+60 405.0 6 106.7 116.0 15.6 14.0 92 W 60 5/20/08 M Line Station 12+00 404.0 6 107.3 116.0 15.5 14.0 93 W 61 5/23/08 M Line Station 11+00 402.5 4 104.2 113.0 17.7 16.0 92 W 62 5/23/08 M Line Station 11+50 403.0 4 104.0 113.0 18.9 16.0 92 Project Number: 971009-050 Project Name: LNR/Bressi Project Location: 0 - Client: 0 Page 2of5 8/25/2 8:45:19AM - - - - - - - .- - - - IM1,10*1101- - ,- SUMMARY OF FIELD DENSITY TESTS Test Test Test Location Test Soil Dry Density Moisture (%) Relative (%) No. Date Of Lot # Elev (ft) Type Field Max Field Opt. Compaction Remarks W 63 5/23/08 M Line Station 10+20 403.0 4 104.9 113.0 17.5 16.0 93 W 64 6/3/08 M Line Station 11+50 404.0 6 102.5 116.0 14.8 14.0 88 W 64A 6/3/08 M Line C Station 11+50 404.0 6 107.5 116.0 16.5 14.0 93 W 65 6/3/08 M Line C Station 11+20 403.5 6 104.9 116.0 16.1 14.0 90 W 66 6/3/08 M Line C Station 10+80 404.0 6 104.7 116.0 15.2 14.0 90 W 67 6/3/08 M Line C Station 9+50 406.0 6 106.6 116.0 16.9 14.0 92 W 68 6/4/08 M South of Major B 400.0 9 101.5 112.0 17.9 15.5 91 W 69 6/4/08 M South of Major B 401.0 9 102.7 112.0 16.8 15.5 92 W 70 6/4/08 M South of Major B 401.5 9 101.8 112.0 16.2 15.5 91 W 71 6/4/08 M South of Major B 403.0 9 101.0 112.0 18.2 15.5 90 W 72 6/4/08 M South of Major B 404.0 9 103.4 112.0 15.9 15.5 92 W 73 6/4/08 M Line B Station 16+78 374.0 5 110.8 118.0 15.2 13.0 94 W 74 6/4/08 M Line Station 16+75 374.0 5 106.8 118.0 14.5 13.0 91 W 75 6/4/08 M Line B Station 16+78 374.0 5 106.5 118.0 14.7 13.0 90 W 76 6/9/08 FS North of Major A Station 14+80 401.0 5 108.2 118.0 15.5 13.0 92 W 77 6/9/08 PS North of Major A Station 14+95 402.0 5 108.5 118.0 14.8 13.0 92 W 78 6/9/08 FS North of Major A Station 14+95 402.0 5 108.0 118.0 15.2 13.0 92 W 79 6/9/08 WS Major A Station 14+80 401.5 5 107.5 118.0 13.9 13.0 91 W 80 6/9/08 WS Major Station 14+80 402.0 5 107.3 118.0 14.7 13.0 91 W 81 6/10/08 FS East of Shop D Station 10+80 404.0 6 106.6 116.0 15.2 14.0 92 W 82 6/10/08 FS East of Shop Station 10+54 403.0 6 104.9 116.0 14.8 14.0 90 W 83 6/10/08 WS Shop Station 11+04 404.0 6 107.0 116.0 14.1 14.0 92 W 84 6/10/08 WS Shop Station 11+04 404.0 6 107.3 116.0 15.7 14.0 . 93 W 85 6/10/08 HL Southeast of Shop D Station lO+15 404.0 6 105.8 116.0 16.2 14.0 91 W 86 6/10/08 HL Southeast of Shop DStation 10+15 404.5 6 105.0 116.0 15.8 14.0 91 W 87 6/11/08 HL South of Shop G Station 15+95 405.0 6 108.2 116.0 15.5 14.0 93 W 88 6/11/08 FS South of Shop G Station 16+48 405.0 6 106.0 116.0 14.9 14.0 91 W 89 6/11/08 FS South of Shop Station 16+70 404.0 6 106.2 116.0 14.8 14.0 92 W 90 6/11/08 FS South of Shop G Station 16+79 403.0 6 106.5 116.0 14.2 14.0 92 W 91 6/12/08 M Line Station 11+70 404.0 6 107.5 116.0 15.9 14.0 93 W 92 6/12/08 M Line Station 11+82 405.0 6 106.6 116.0 16.0 14.0 92 W 93 6/12/08 M Line C Station 13+05 404.0 6 105.8 116.0 16.7 14.0 91 Retest on 64A Retest of 64 Project Number: 971 009-050 Project Name: LNR/Bressi Project Location: 0 Client: 0 Page 3 of 5 8/25/2 8:45:19AM - - - - .- - - - - - - - - - - - - - - SUMMARY OF FIELD DENSITY TESTS Test Test Test Location Test Soil Dry Density Moisture (%) Relative (%) No. Date Of Lot # Elev (ft) Type Field Max Field Opt. Comnaction Remarks W 94 6/12/08 M Line Station 13+15 404.5 6 106.0 116.0 15.2 14.0 91 W 95 6/13/08 M Line Station 11+70 400.0 4 104.0 113.0 17.2 16.0 92 W 96 6/13/08 M Line Station 12+10 401.0 4 104.9 113.0 16.5 16.0 93 W 97 6/13/08 M Line Station 12+40 401.0 4 104.2 113.0 16.0 16.0 92 W 98 6/17/08 PS Southwest of Shop FStation 13+70 0.0 2 109.5 116.0 15.8 14.0 94 W 99 6/17/08 FS Southwest of Shop FStation 13+70 0.0 2 107.0 116.0 16.3 14.0 92 W 100 6/17/08 FS West of Shop F Station 13+70 0.0 2 107.1 116.0 16.0 14.0 92 W 101 6/20/08 M Line Station 12+65 404.5 6 105.8 116.0 15.2 14.0 91 W 102 6/20/08 M Line Station 12+25 405.0 6 105.2 116.0 16.5 14.0 91 W 103 6/20/08 M Line Station 11+50 405.0 6 106.8 116.0 16.3 14.0 92 W 104 6/24/08 M Line B Station 15+30 399.0 4 103.8 113.0 18.4 16.0 92 W 105 6/24/08 M Line Station 15+25 400.0 4 103.0 113.0 16.5 16.0 91 W 106 6/24/08 M Line Station 15+20 402.0 4 102.8 113.0 17.1 16.0 91 W 107 6/24/08 M Line Station 15+15 403.0 4 104.5 113.0 17.2 16.0 92 W 108 6/26/08 M Line Station 11+05 405.0 6 104.8 116.0 16.2 14.0 90 W 109 6/26/08 M Line Station 10+70 406.0 6 105.0 116.0 15.9 14.0 91 W 110 6/26/08 M Line Station 10+10 407.0 6 105.3 116.0 16.3 14.0 91 W 111 6/27/08 WS Pad Station 10+10 406.0 6 105.7 116.0 16.2 14.0 91 W 112 6/27/08 WS Pad Station 10+10 408.5 6 105.0 116.0 15.8 14.0 91 W 113 6/27/08 WS Shop A Station 10+63 404.0 6 106.8 116.0 16.2 14.0 92 W 114 6/27/08 WS Shop Station 10+63 405.0 6 106.8 116.0 15.9 14.0 92 W 115 7/8/08 PS North of Shop B Station 11+30 405.0 6 101.2 116.0 15.8 14.0 87 W liSA 7/8/08 FS North of Shop B Station 11+30 405.0 6 106.8 116.0 15.0 14.0 92 W 116 7/8/08 FS East of Shop A Station 10+60 406.0 6 105.5 116.0 16.2 14.0 91 W 117 7/8/08 FS East of Shop A Station 10+50 405.5 6 105.0 116.0 16.5 14.0 91 W 118 7/8/08 FS East of Shop A Station 10+50 406.0 6 106.2 116.0 16.0 14.0 92 W 119 7/8/08 FS East of Shop A Station 10+50 406.0 6 105.1 116.0 15.5 14.0 91 W 120 7/25/08 WS Reclaimed Water Station 10+62 411.5 4 104.2 113.0 17.9 16.0 92 W 121 7/25/08 WS Reclaimed Water Station 10+62 411.5 4 104.5 113.0 16.8 16.0 92 W 122 7/25/08 WS Reclaimed Water Station 10+62 . 408.0 4 103.9 113.0 18.1 16.0 92 W 123 7/25/08 WS Reclaimed Water Station 10+62 409.0 4 103.2 113.0 16.9 16.0 91 W 124 7/28/08 FS North of Major C 403.0 5 108.5 118.0 14.5 13.0 92 Retest on liSA Retest of 115 Project Number: 971009-050 Project Name: LNR/Bressi Project Location: 0 Client: 0 Page 4 of 5 8/25/2 8:45:19AM - - -. - - - - - - - - - - - - SUMMARY OF FIELD DENSITY TESTS Test Test Test Location Test Soil Dry Density Moisture (%) Relative (%) No. Date Of Lot # Elev (ft) Type Field Max Field Opt. Compaction Remarks I W 125 7/28/08 FS North of Major C 404.0 5 107.6 118.0 14.0 13.0 91 I Project Number: 971009-050 4 Project Name: LNR/Bressi Project Location: 0 Client: 0 Page of 5 8125/2 8:45:19AM - - M - - - - - - - = - - - - - - - - SUMMARY OF FIELD DENSITY TESTS Test Test Test Location Test Soil Dry Density Moisture (%) Relative (%) No. Date Of Lot # Elev (ft) Type Field Max Field Opt. Compaction Remarks SD 1 3/14/08 M Line A Station 10+10 396.0 1 102.8 110.0 19.8 17.0 93 SD 2 3/14/08 M Line A Station 10+30 397.0 1 102.9 110.0 18.4 17.0 94 SD 3 3/14/08 M Line Station 10+80 399.0 1 103.7 110.0 19.2 17.0 94 SD 4 3/14/08 M Line Station 11+20 400.0 5 107.3 118.0 14.9 13.0 91 SD 5 3/14/08 M Line A Station 11+50 400.5 5 109.4 118.0 15.7 13.0 93 SD 6 3/14/08 M Line A Station 12+00 401.0 5 107.9 118.0 14.7 13.0 91 SD 7 3/14/08 M Line A Station 12+30 403.0 5 107.5 118.0 16.2 13.0 91 SD 8 3/28/08 I Line A Station 11+65 400.0 5 109.6 118.0 15.2 13.0 93 SD 9 3/28/08 I Line A Station 11+75 400.5 5 109.2 118.0 13.8 13.0 93 SD 10 3/28/08 I Line A Station 11+70 402.0 5 110.7 118.0 15.2 13.0 94 SD 11 3/28/08 I Line Station 10+30 397.0 4 103.8 113.0 17.4 16.0 92 SD 12 3/28/08 I Line Station 10+40 397.0 4 102.8 113.0 16.9 16.0 91 SD 13 3/28/08 I Line A Station 10+35 398.0 4 103.5 113.0 17.2 16.0 92 SD 14 3/28/08 I Line Station 10+48 398.0 4 103.5 113.0 17.0 16.0 92 SD 15 3/28/08 I Line Station 10+50 0.0 4 102.0 113.0 16.1 16.0 90 SD 16 4/21/08 M Line C Station 12+85 403.0 4 104.8 113.0 18.1 16.0 93 SD 17 4/21/08 M Line C Station 13+35 404.0 4 104.5 113.0 18.0 16.0 92 SD 18 4/21/08 M Line Station 13+65 402.0 4 103.8 113.0 17.5 16.0 92 SD 19 4/21/08 M Line Station 13+70 403.0 4 100.2 113.0 16.7 16.0 89 Retest on 19A SD 19A 4/21/08 M Line C Station 13+70 403.0 4 105.9 113.0 18.5 16.0 94 Retest of 19 SD 20 4/21/08 M Line Station 12+00 405.0 4 103.7 113.0 16.9 16.0 92 SD 21 4/21/08 M Line Station 11+70 405.0 4 103.3 113.0 16.6 16.0 91 SD 22 4/21/08 M Line Station 11+40 401.0 2 106.9 116.0 15.8 14.0 92 SD 23 4/21/08 M Line Station 11+70 402.5 2 106.8 116.0 16.2 14.0 92 SD 24 4/21/08 M Line Station 12+00 403.0 2 107.3 116.0 16.0 14.0 93 SD 25 4/21/08 M Line Station 12+35 401.0 2 108.7 116.0 16.2 14.0 94 SD 26 4/21/08 M Line Station 12+70 402.0 2 108.0 116.0 15.8 14.0 93 SD 27 4/22/08 M Line B-3 Station 13+90 402.0 4 103.5 113.0 17.9 16.0 92 SD 28 4/22/08 M Line B-3 Station 14+20 404.0 4 101.9 113.0 16.5 16.0 90 SD 29 4/22/08 M Line B-3 Station 14+60 403.0 4 103.6 113.0 17.3 16.0 92 SD 30 4/22/08 M Line B-3 . Station 14+90 403.0 4 98.4 113.0 17.5 16.0 87 Retest on 30A SD 30A 4/22/08 M Line B-3 Station 14+90 403.0 4 101.8 113.0 16.9 16.0 90 Retest of 30 Project Number: 971009-050 Project Name: LNR/Bressi Project Location: 0 Client: 0 Page 1 of 5 8/25/2 9:37:30AM - - - - - - - - - - - - - - - - - - - SUMMARY OF FIELD DENSITY TESTS Test Test Test Location Test Soil Dry Density Moisture (%) Relative (%) No. Date Of Lot # Elev (ft) Type Field Max Field Opt. Compaction Remarks SD 31 4/22/08 M Line B-3 Station 15+20 404.0 4 102.7 113.0 16.6 16.0 91 SD 32 4/22/08 M Line B-3 Station 15+35 403.0 4 103.5 113.0 16.8 16.0 92 SD 33 4/22/08 M Line B-3 Station 15+70 405.5 4 101.9 113.0 17.9 16.0 90 SD 34 4/22/08 M Line B-3 Station 16+00 403.5 7 100.9 111.5 19.2 17.5 90 SD 35 4/28/08 M Line B-3 Station 11+15 399.0 2 105.2 116.0 15.8 14.0 91 SD 36 4/28/08 M Line B-3 Station 11+10 401.0 2 105.5 116.0 16.2 14.0 91 SD 37 4/28/08 M Line B-3 Station 11+20 402.0 2 104.9 116.0 16.0 14.0 90 SD 38 4/28/08 M Line B-3 Station 11+12 403.5 2 105.8 116.0 16.7 14.0 91 SD 39 4/29/08 M Line B-3 Station 11+32 401.0 2 106.7 116.0 15.8 14.0 92 SD 40 4/29/08 M Line B-3 Station 11+53 402.5 2 103.2 116.0 17.8 14.0 89 Retest on 40A SD 40A 4/29/08 M Line B-3 Station 11+53 402.5 2 109.5 116.0 15.9 14.0 94 Retest of 40 SD 41 4/29/08 M Line B-3 Station 11+35 404.0 2 105.2 116.0 16.3 14.0 91 SD 42 4/29/08 M Line B-3 Station 11+60 405.0 2 105.2 116.0 16.0 14.0 91 SD 43 5/1/08 CO Line Station 9+90 403.0 6 109.2 116.0 16.2 14.0 94 SD 44 5/1/08 CO Line B Station 10+00 404.5 6 107.7 116.0 15.9 14.0 93 SD 45 5/1/08 CO Line B Station 10+10 406.0 6 107.0 116.0 15.5 14.0 92 SD 46 5/1/08 M Line B Station 10+50 403.0 6 106.9 116.0 16.7 14.0 92 SD 47 5/1/08 M Line B Station 11+10 406.0 6 107.3 116.0 16.9 14.0 93 SD 48 5/1/08 M Line B Station 10+90 407.0 6 107.5 116.0 14.5 14.0 93 SD 49 5/2/08 CO Line H Station 13+95 392.0 9 101.8 112.0 17.8 15.5 91 SD 50 5/2/08 CO Line H Station 13+90 394.0 9 102.7 112.0 16.9 15.5 92 SD 51 5/2/08 CO Line Station 13+75 395.0 9 102.3 112.0 16.8 15.5 91 SD 52 5/2/08 CO Line Station 13+80 395.0 9 102.4 112.0 16.0 15.5 91 SD 53 5/2/08 CO Line H Station 13+80 394.0 9 103.7 112.0 16.8 15.5 93 SD 54 5/2/08 CO Line Station 14+05 . 396.0 9 102.9 112.0 17.3 15.5 92 SD 55 5/2/08 CO Line Station 14+10 396.0 9 102.2 112.0 16.2 15.5 91 SD 56 5/2/08 M Line H Station 14+00 398.0 9 101.8 112.0 17.2 15.5 91 SD 57 5/2/08 M Line Station 13+70 398.0 9 103.8 112.0 16.9 15.5 93 SD 58 5/2/08 M Line H Station 13+75 398.0 9 103.0 112.0 16.0 15.5 92 SD 59 5/6/08 M 4 inch Line South of Major A 397.0 9 98.7 112.0 17.8 15.5 88 Retest on59A SD 59A 5/6/08 M 4 inch Line South of Major A 397.0 9 102.7 112.0 17.2 15.5 92 Retest of59 SD 60 5/6/08 M 4 inch Line South of Major A 398.0 9 102.9 112.0 15.9 15.5 92 Project Number: 971009-050 40,1 Project Name: LNRlBressi Project Location: 0 Client: 0 . Page 2of5 8/25/2 9:37:30AM - - - - - - - - - - - - - - - - - - - SUMMARY OF FIELD DENSITY TESTS Test Test Test Location Test Soil Dry Density Moisture (%) Relative (%) No. Date Of Lot # Elev (ft) Type Field Max Field Opt. Compaction Remarks SD 61 5/6/08 M 4 inch Line South of Major A 399.0 9 102.8 112.0 16.5 15.5 92 SD 62 5/6/08 M 4 inch Line South of Major A 397.0 9 102.8 112.0 16.7 15.5 92 SD 63 5/6/08 M 4 inch Line South of Major A 398.0 9 102.5 112.0 17.2 15.5 92 SD 64 5/6/08 L 4 inch Line South of Major A 406.0 6 108.2 116.0 15.7 14.0 93 SD 65 5/6/08 M Line 405.0 6 106.5 116.0 14.9 14.0 92 SD 66 5/6/08 L Line 406.0 6 106.0 116.0 16.2 14.0 91 SD 67 5/6/08 M Line 407.0 6 106.2 116.0 16.0 14.0 92 SD 68 5/6/08 CB Line B-3 403.0 6 105.4 116.0 15.9 14.0 91 SD 69 5/6/08 CB Line B-3 404.0 6 105.0 116.0 15.5 14.0 91 SD 70 5/6/08 CB Line B-3 404.0 6 108.8 116.0 16.9 14.0 94 SD 71 5/7/08 M Line Station 12+30 397.0 4 103.8 113.0 16.9 16.0 92 SD 72 5/7/08 M Line H Station 12+50 398.0 4 103.8 113.0 17.5 16.0 92 SD 73 5/7/08 M Line H Station 12+70 396.5 4 102.5 113.0 17.0 16.0 91 SD 74 5/7/08 M Line Station 13+00 398.0 4 103.7 113.0 17.8 16.0 92 SD 75 5/7/08 I Line B-3 Station 15+17 403.0 6 107.5 116.0 15.8 14.0 93 SD 76 5/7/08 I Line B-3 Station 15+47 404.0 6 105.3 116.0 16.7 14.0 91 SD 77 5/7/08 I Line B-3 Station 15+90 406.0 6 105.2 116.0 16.0 14.0 91 SD 78 5/7/08 CB Line B-3 Station 14+70 405.0 6 105.3 116.0 15.5 14.0 91 SD 79 5/7/08 CB Line B-3 Station 14+75 405.0 6 104.9 116.0 15.0 14.0 90 SD 80 5/9/08 M Line Station 11+00 403.0 4 102.8 113.0 18.2 16.0 91 SD 81 5/9/08 M Line Station 10+80 402.0 4 102.7 113.0 18.0 16.0 91 SD 82 5/9/08 M Line Station 10+60 399.0 4 104.5 113.0 16.5 16.0 92 SD 83 5/9/08 M Line Station 10+35 402.0 4 103.9 113.0 17.8 16.0 92 SD 84 5/9/08 M Line Station 10+20 401.0 4 101.9 113.0 17.2 16.0 90 SD 85 5/13/08 I Line Station 13+25 405.0 4 103.8 113.0 16.8 16.0 92 SD 86 5/13/08 I Line Station 13+39 406.5 4 103.2 113.0 16.5 16.0 91 SD 87 5/13/08 I Line H Station 13+32 407.5 4 103.0 113.0 17.2 16.0 91 SD 88 5/13/08 CB Line H Station 11+05 397.0 4 104.5 113.0 16.9 16.0 92 SD 89 5/13/08 CB Line Station 11+10 398.0 4 103.2 113.0 17.2 16.0 91 SD 90 5/13/08 CB Line H Station 11+00 400.0 4 101.9 113.0 16.6 16.0 90 SD 91 5/13/08 CB Line H Station 11+10 401.5 4 102.7 113.0 16.5 16.0 91 SD 92 5/14/08 M Line El Station 11+52 398.0 4 104.2 113.0 16.5 16.0 92 Project Number: 971009-050 Project Name: LNR/Bressi Project Location: 0 Client: 0 Page 3 of 5 8/25/2 9:37:30AM - - - - - - - - - - - - - - - - - - - SUMMARY OF FIELD DENSITY TESTS Test Test Test Location Test Soil Dry Density Moisture (%) Relative (%) No. Date Of Lot # Elev (ft) Type Field Max Field Opt. Compaction Remarks SD 93 5/14/08 M Line El Station 11+52 400.0 4 104.9 113.0 17.8 16.0 93 SD 94 5/14/08 M Line El Station 11+32 402.0 4 103.8 113.0 17.0 16.0 92 SD 95 5/14/08 M Line El Station 11+52 399.0 4 103.2 113.0 16.6 16.0 91 SD 96 5/14/08 M Line El Station 11+52 401.0 4 103.8 113.0 17.8 16.0 92 SD 97 5/14/08 M Line El Station 11+52 403.0 4 104.7 113.0 17.2 16.0 93 SD 98 5/16/08 M Line El Station 10+15 400.0 4 104.9 113.0 17.2 16.0 93 SD 99 5/16/08 M Line El Station 10+30 402.0 4 103.8 113.0 16.9 16.0 92 SD 100 5/16/08 M Line El Station 10+50 403.0 4 102.7 113.0 18.0 16.0 91 SD 101 5/16/08 M Line El Station 10+60 400.0 4 103.8 113.0 17.8 16.0 92 SD 102 5/16/08 M Line El Station 11+20 403.0 4 103.2 113.0 17.2 16.0 91 SD 103 5/16/08 M Line El Station 11+00 397.0 4 104.7 113.0 16.2 16.0 93 SD 104 5/16/08 M Line Station 10+35 405.5 5 107.8 118.0 15.5 13.0 91 SD 105 5/16/08 M Line Station 11+00 406.0 5 107.2 118.0 14.4 13.0 91 SD 106 5/16/08 M Line Station 11+50 406.0 5 106.9 118.0 14.7 13.0 91 SD 107 5/16/08 M Line C Station 12+00 406.0 5 106.5 118.0 15.2 13.0 90 SD 108 5/21/08 CB Line Station 13+40 396.0 4 103.8 113.0 16.5 16.0 92 SD 109 5/21/08 CB Line Station 13+25 399.0 4 103.2 113.0 16.5 16.0 91 SD 110 5/21/08 CB Line Station 12+90 400.0 4 104.9 113.0 17.5 16.0 93 SD 111 5/21/08 CB Line Station 12+82 400.0 4 103.2 113.0 18.5 16.0 91 SD 112 5/21/08 CB Line Station 12+79 402.0 4 103.0 113.0 17.9 16.0 91 SD 113 5/29/08 1 Line C Station 12+50 402.0 5 107.3 118.0 14.2 13.0 91 SD 114 5/29/08 I Line C Station 12+35 402.0 5 106.9 118.0 13.8 13.0 91 SD 115 5/29/08 I Line C Station 12+40 404.0 5 107.4 118.0 14.5 13.0 91 SD 116 5/29/08 CO Line Station 10+00 399.0 4 103.7 113.0 17.9 16.0 92 SD 117 5/29/08 CO Line E Station 10+15 401.0 4 103.4 113.0 19.5 16.0 92 SD 118 6/2/08 1 Line El Station 11+70 398.0 7 100.9 111.5 18.9 17.5 90 SD 119 6/2/08 I Line El Station 11+60 399.0 7 102.8 111.5 17.9 17.5 92 SD 120 6/2/08 I Line El Station 11+60 399.0 7 101.6 111.5 18.5 17.5 91 SD 121 6/2/08 I Line El Station 11+52 401.0 7 101.0 111.5 18.0 17.5 91 SD 122 7/9/08 M Line Station 9+25 407.0 6 108.2 116.0 15.8 14.0 93 SD 123 7/9/08 M Line Station 9+68 406.5 6 106.5 116.0 16.1 14.0 92 SD 124 7/9/08 . M Line C Station 10+00 406.0 6 106.4 116.0 16.7 14.0 92 Project Number: 971009-050 Project Name: LNRlBressi Project Location: 0 Client: 0 Page 4of5 8/25/2 9:37:30AM - - - - - - - - - - - - - - - - - - - SUMMARY OF FIELD DENSITY TESTS Test Test Test Location Test Soil Dry Density Moisture (%) Relative (%) No. Date Of Lot # Elev (ft) Type Field Max Field Opt. Compaction Remarks SD 125 7/14/08 M Line Station 10+10 404.5 6 104.9 116.0 15.2 14.0 90 SD 126 7/14/08 M Line Station 10+35 405.0 6 107.0 116.0 14.8 14.0 92 SD 127 7/14/08 M Line Station 10+70 405.0 6 106.6 116.0 14.9 14.0 92 Project Number: 971009-050 0 Project Name: LNR/Bressi Project Location: 0 Client: 0 Page-5 of 8/25/2 9:37:30AM - - - - - - - - - - - - - - - - - - - SUMMARY OF FIELD DENSITY TESTS Test Test Test Location Test Soil Dry Density Moisture (%) Relative (%) No. Date Of Lot # Elev (ft) Type Field Max Field Opt. Compaction Remarks 1 2/1/08 CF Major 'C' 398.0 1 102.2 110.0 19.0 17.0 93 2 2/1/08 CF Major "C" 401.0 1 103.9 110.0 18.9 17.0 94 3 2/1/08 CF Major "C" 402.0 1 105.2 110.0 18.6 17.0 96 4 2/1/08 CF Major "C" 402.0 1 106.8 110.0 18.5 17.0 97 5 2/1/08 CF Major "C" 397.0 1 103.2 110.0 19.0 17.0 94 6 2/1/08 CF Major "C" 397.0 1 102.9 110.0 19.1 17.0 94 7 2/1/08 CF . Major "C" 400.0 1 102.7 110.0 19.2 17.0 93 8 2/1/08 CF Major "C" 402.0 1 103.4 110.0 20.1 17.0 94 9 2/6/08 CF Major "C" 403.0 1 103.9 110.0 19.4 17.0 94 10 2/6/08 CF Major "C" 402.0 1 102.0 110.0 19.0 17.0 93 11 2/6/08 CF Major "C" 403.0 1 102.7 110.0 19.8 17.0 93 12 2/6/08 CF Major "C" 402.0 2 106.7 116.0 16.0 14.0 92 13 2/6/08 CF Major "C" 402.0 2 105.2 116.0 16:9 14.0 91 14 2/6/08 CF Major "C" 404.0 2 105.9 116.0 16.5 14.0 91 15 2/6/08 CF Major "C" 404.0 2 106.8 116.0 17.7 14.0 92 16 2/7/08 CF Major "C" 405.0 2 106.3 116.0 17.1 14.0 92 17 2/7/08 CF Major "C" 402.0 2 105.4 116.0 16.5 14.0 91 18 2/7/08 CF Major "C" 402.0 2 105.0 116.0 16.2 14.0 91 19 2/7/08 CF Major "C" 404.0 2 104.9 116.0 17.7 14.0 90 20 2/7/08 CF Major "C" 403.0 2 107.8 116.0 16.3 14.0 93 21 2/8/08 CF Major "C" 402.0 2 107.3 116.0 15.7 14.0 93 22 2/8/08 CF Major "C" 402.0 2 106.9 116.0 16.8 14.0 92 23 2/8/08 CF Major "C" 403.0 2 104.7 116.0 19.2 14.0 90 24 2/8/08 CF Major "C" 404.0 2 104.9 116.0 19.0 14.0 90 25 2/8/08 CF Major "C" 404.0 2 104.5 116.0 15.2 14.0 90 26 2/11/08 CF Major "A" 400.0 3 106.1 116.0 17.1 13.5 91 27 2/11/08 CF Major "A" 401.0 3 104.7 116.0 16.9 13.5 90 28 2/11/08 CF Major "A" . 401.0 3 105.3 116.0 17.4 13.5 91 29 2/11/08 CF Major "A" . 401.0 3 106.6 116.0 16.6 13.5 92 30 2/11/08 CF Major "A" 401.0 3 104.5 116.0 15.5 13.5 90 31 2/12/08 CF Major "A" 401.0 3 105.9 116.0 14.9 13.5 91 32 1 2/12/08 CF Major "A' 401.0 3 107.1 116.0 15.2 13.5 92 Project Number: 971009-050 Project Name: LNR/Bressi Project Location: 0 . Client: 0 Page 1 of 5 6/26/2 3:51:35PM - - - - - - - - - - - - - - - - - - - SUMMARY OF FIELD DENSITY TESTS Test Test Test Location Test Soil Dry Density Moisture (%) Relative (%) No. Date Of Lot # Elev (ft) Type Field Max Field Opt. Compaction Remarks 33 2/12/08 CF Major "A" 401.0 3 106.2 116.0 16.1 13.5 92 34 2/12/08 CF Major 'A" 403.0 3 106.7 116.0 16.2 13.5 92 35 2/12/08 CF Major "A" 402.0 3 105.8 116.0 15.9 13.5 91 36 2/12/08 CF Major "A" 402.0 3 105.5 116.0 18.1 13.5 91 37 2/12/08 CF Major "A" 402.0 3 106.1 116.0 16.0 13.5 91 38 2/12/08 CF Major "A" 402.0 3 106.8 116.0 17.2 13.5 92 39 2/12/08 CF Major "A" 402.0 3 105.9 116.0 15.7 13.5 91 40 2/13/08 CF Major "A" 400.0 3 106.7 116.0 15.2 13.5 92 41 2/13/08 CF Major "A" 401.0 3 105.3 116.0 16.1 13.5 91 42 2/13/08 CF Major "A" 399.0 3 105.0 116.0 16.5 13.5 91 43 2/13/08 CF Major "A" 400.0 3 106.8 116.0 16.2 13.5 92 44 2/13/08 CF Major "A" 400.0 3 105.8 116.0 15.9 13.5 91 45 2/13/08 CF Pad "A" 404.0 4 104.1 113.0 18.1 16.0 92 46 2/13/08 CF Pad "A" 405.0 4 103.9 113.0 18.5 16.0 92 47 2/13/08 CF Pad "A" 406.0 4 103.5 113.0 18.2 16.0 92 48 2/13/08 CF Pad "A" 406.0 4 105.8 113.0 18.0 16.0 94 49 2/13/08 CF Pad "A" 406.0 4 103.8 113.0 18.6 16.0 92 50 4/19/08 CF Major "A" 401.0 4 104.3 113.0 18.2 16.0 92 51 4/19/08 CF Major "A" 403.0 4 104.7 113.0 18.8 16.0 93 52 4/19/08 CF Major "A" 403.0 4 103.9 113.0 17.9 16.0 92 53 4/19/08 CF Major "A" 403.0 4 104.7 113.0 18.9 16.0 93 54 4/19/08 CF Major "A" 403.0 4 104.5 113.0 19.1 16.0 92 55 4/19/08 CF Major "A" 403.0 4 104.0 113.0 18.4 16.0 92 56 4/19/08 CF Major "A" 403.0 4 103.8 113.0 18.0 16.0 92 57 4/19/08 CF Shop "E" 403.0 3 105.9 116.0 15.8 13.5 91 58 4/19/08 CF Shop "E" 403.0 3 106.2 116.0 16.2 13.5 92 59 4/19/08 CF Major "B" 403.0 3 108.4 116.0 14.8 13.5 93 60 4/19/08 CF Major "B" 404.0 3 107.4 116.0 15.2 13.5 93 61 4/19/08 CF Major "B" 404.0 3 106.2 116.0 15.0 13.5 92 62 4/19/08 CF Shop "E" 404.0 3 106.8 116.0 16.2 13.5 92 63 4/19/08 CF Shop "E" 404.0 3 108.5 116.0 15.2 13.5 94 64 4/19/08 CF Major "B" 405.0 3 103.2 116.0 11.9 13.5 89 Retest on64A Project Number: 971009-050 Apt Project Name: LNR/Bressi Project Location: 0 Client: 0 Page 2of5 6/26/2 3:51:36PM - - - - - - - - - - - - - - - - - - - SUMMARY OF FIELD DENSITY TESTS Test Test Test Location Test Soil Dry Density Moisture (%) Relative (%) No. Date Of Lot # Elev (ft) Type Field Max Field Opt. Compaction Remarks 64A 4/19/08 CF Major "B' 405.0 3 107.3 116.0 15.2 13.5 93 Retest of 64 65 4/19/08 CF Shop "E" 405.0 3 104.2 116.0 12.1 13.5 90 Retest on65A 65A 4/19/08 CF Shop "E" 405.0 3 108.2 116.0 16.0 13.5 93 Retest of 65 66 3/5/08 CF Major "B" 0.0 2 107.1 116.0 16.8 14.0 92 67 3/5/08 CF Major "B" 403.0 2 105.8 116.0 16.2 14.0 91 68 3/5/08 CF Major "B" 404.0 2 105.9 116.0 17.2 14.0 91 69 3/5/08 CF Major "B" 404.0 2 106.2 116.0 16.8 14.0 92 70 3/5/08 CF Major "B" 405.0 2 106.3 116.0 16.2 14.0 92 71 3/5/08 CF Major "B" 405.0 2 106.0 116.0 16.2 14.0 91 72 3/5/08 CF Major "B" 404.0 2 104.2 116.0 16.8 14.0 90 73 3/5/08 CF Major "B" 404.0 2 106.6 116.0 16.0 14.0 92 74 3/5/08 CF Shop "G" 405.0 4 103.9 113.0 19.1 16.0 92 75 3/5/08 CF Shop "G" 404.5 4 104.7 113.0 18.4 16.0 93 76 3/6/08 FG Major "C" 0.0 2 107.2 116.0 16.2 14.0 92 77 3/6/08 FG Major "C" 0.0 2 106.2 116.0 15.9 14.0 92 78 3/6/08 PG Major "C" 0.0 2 105.9 116.0 16.7 14.0 91 79 3/6/08 FG Major "C" 0.0 2 106.3 116.0 16.2 14.0 92 80 3/6/08 PG Major "A" 0.0 5 108.3 118.0 15.2 13.0 92 81 3/6/08 FG Major "A" 0.0 5 107.4 118.0 14.9 13.0 91 82 3/6/08 PG Major "A" 0.0 5 107.6 118.0 16.1 13.0 91 83 3/6/08 PG Major "A" 0.0 5 107.9 118.0 15.3 13.0 91 84 3/6/08 PG Major "A" 0.0 5 108.4 118.0 15.0 13.0 92 85 3/6/08 PG Major "A" 0.0 5 107.2 118.0 16.1 13.0 91 86 3/7/08 CF Shop "G" 405.0 3 105.7 116.0 16.1 13.5 91 87 3/7/08 CF Shop "G" 405.0 3 105.2 116.0 16.2 13.5 91 88 3/7/08 CF Shop "F" 404.5 3 106.3 116.0 16.8 13.5 92 89 3/7/08 CF Shop "F" 404.5 3 106.8 116.0 15.5 13.5 92 90 3/7/08 CF Shop "F" 405.0 3 105.7 116.0 16.2 13.5 91 91 3/7/08 CF Shop "F" 405.0 3 105.9 116.0 16.3 13.5 91 92 3/7/08 CF Shop "G" 406.0 3 101.2 116.0 17.1 13.5 87 Retest on92A 92A 3/7/08 CF Shop "G" 406.0 3 106.6 116.0 16.2 13.5 92 Retest of92 93 3/7/08 CF Shop "F" 405.5 3 104.8 116.0 15.2 13.5 90 Project Number: 971009-050 Project Name: LNR/Bressi Project Location: 0 Client: 0 Page 3of5 6/26/2 3:51:36PM - - - - - - - - - - - - - - - - - - - SUMMARY OF FIELD DENSITY TESTS Test Test Test Location Test Soil Dry Density Moisture (%) Relative (%) No. Date Of Lot # Elev (ft) Type Field Max Field Opt. Compaction Remarks 94 3/7/08 CF Shop 7" 405.5 3 104.9 116.0 16.0 13.5 90 95 3/12/08 CF Shop "B" 404.0 6 105.2 116.0 16.2 14.0 91 96 3/12/08 CF Shop "B" 405.0 6 107.4 116.0 15.9 14.0 93 97 3/12/08 CF Shop "B" 406.0 6 105.9 116.0 15.8 14.0 91 98 3/12/08 CF Shop "B" 406.0 6 105.7 116.0 15.3 14.0 91 99 3/12/08 CF Shop "B" 406.5 6 100.7 116.0 16.8 14.0 87 Retest on 99A 99A 3/12/08 CF Shop "B" 406.5 6 107.5 116.0 15.7 14.0 93 Retest of99 100 3/13/08 FG Shop 7' 0.0 5 108.9 118.0 18.0 13.0 92 101 3/13/08 FG Shop 7" 0.0 5 108.8 118.0 17.9 13.0 92 102 3/13/08 FG Shop "G" 0.0 5 108.5 118.0 17.8 13.0 92 103 3/13/08 FG Shop "G" 0.0 5 107.9 118.0 18.3 13.0 91 104 3/13/08 FG Shop "E" 0.0 2 104.8 116.0 17.0 14.0 90 105 3/13/08 FG Shop "E" 0.0 2 106.7 116.0 16.3 14.0 92 106 3/13/08 FG Major "B" 0.0 2 110.6 116.0 16.4 14.0 95 107 3/13/08 FG Major "B" 0.0 2 110.4 116.0 16.0 14.0 95 108 3/13/08 FG Major "B" 0.0 2 110.0 116.0 17.4 14.0 95 109 3/13/08 FG Major "B" 0.0 2 109.7 116.0 16.1 14.0 95 110 3/18/08 FG Pad "A" 0.0 5 106.9 118.0 15.2 13.0 91 111 3/18/08 FG Pad "A" 0.0 5 106.3 118.0 16.0 13.0 90 112 3/18/08 CF Major "A" 397.0 1 103.6 110.0 19.8 17.0 94 113 3/18/08 CF Major "A" 397.0 1 101.2 110.0 19.3 17.0 92 114 3/18/08 CF Major "A" 398.0 1 101.8 110.0 20.1 17.0 93 115 3/18/08 CF Major "A" 398.0 1 102.7 110.0 18.9 17.0 93 116 3/20/08 FG Shop "D" 0.0 5 112.6 118.0 13.9 13.0 95 117 3/20/08 FG Shop "D" 0.0 5 112.8 118.0 14.2 13.0 96 118 3/20/08 FG Shop "D" 0.0 5 111.8 118.0 14.6 13.0 95 119 3/20/08 FG Shop "A" 0.0 6 105.2 116.0 16.0 14.0 91 120 3/20/08 FG Shop "A" 0.0 4 102.7 113.0 18.0 16.0 91 121 3/20/08 FG Shop "A" 0.0 6 106.9 116.0 15.0 14.0 92 122 3/20/08 FG Shop "B" 0.0 5 112.8 118.0 15.0 13.0 96 123 3/20/08 FG Shop "B" 0.0 5 105.8 118.0 16.0 13.0 90 124 3/20/08 FG Pad "B" 0.0' 2 108.5 116.0 16.0 14.0 94 Project Number: 971009-050 40,1 Project Name: LNRlBressi Project Location: 0 Client: 0 Page 4of5 6/26/2 3:51:36PM - - - - - - - - - - - - - - ,- - - - - SUMMARY OF FIELD DENSITY TESTS Test Test Test Location Test Soil Dry Density Moisture (%) Relative (%) No. Date Of Lot # Elev (ft) Type Field Max Field Opt. Compaction Remarks 125 3/20/08 FG Pad 'B" 0.0 2 107.0 116.0 14.9 14.0 92 126 3/20/08 FG Shop "C" 0.0 6 108.6 116.0 13.9 14.0 94 127 3/20/08 FG Shop "C" 0.0 6 111.2 116.0 14.0 14.0 96 128 6/24/08 FG Major "A" Building Pad 0.0 5 107.9 118.0 14.7 13.0 91 129 6/24/08 FG Major "A" Building Pad 0.0 5 109.4 118.0 14.5 13.0 93 130 6/24/08 PG Major "A" Building Pad 0.0 5 109.2 118.0 15.1 13.0 93 131 6/24/08 PG Major "A" Building Pad 0.0 5 107.8 118.0 14.9 13.0 91 132 6/24/08 PG Major "A" Building Pad 0.0 5 109.2 118.0 14.5 13.0 93 Project Number: 971009-050 Project Name: LNR/Bressi Project Location: 0 Client: 0 Page 5 of 5 971009-051 APPENDIX C Laboratory Testing Procedures and Test Results Maximum Density Tests: The maximum dry density and optimum moisture Content of typical materials were determined in accordance with ASTM Test Method D1557. The results of these tests are presented in the table below: Sample Number i Sample Descri ption Maximum Dry Density (PCI:) Optimum Moisture Content (%) Olive gray silty to clayey SAND 110.6 17.0 2 Olive brown silty to clayey SAND 116.0 14.0 3 Yellow brown clayey SAND 116.0 13.5 4 Light olive brown silty to clayey SAND 113.0 16.0 5 Pale olive brown silty to clayey SAND 118.0 13.0 6 Gray silty SAND 116.0 14.0 7 Brown clayey SAND 111.5 17.5 8 Brown silty SAND (import) 133.5 9.0 9 Light brown silty to clayey SAND 112.0 15.5 10 Recycled Class II Base 125.5 10.0 11 Recycled Class II Base 130.0 9.0 12 Recycled Class II Base 127.0 6.5 13 Recycled Class II Base 131.1 7.8 C-' I I I I I I I I I I I I I I 1 I I I I 971009-051 APPENDIX C (continue) Laboratory Testing Procedures and Test Results "R"-Value: The resistance "R"-value was determined by the California Materials Method No. 301 for subgrade soils. The samples were prepared and exudation pressure and "R"-value determined on each one. The graphically determined "R"-value exudation pressure of 300 psi is summarized in the table below: Sample Number Sample Location Sample Description R-Value RI Driveway Adjacent to Pad 'A" Yellow brown clayey SAND 32 Ri Parking Area North of Major 'C" Yellow brown clayey, SAND 46 R3 Parking Area South of Shop "D" Olive brown silty lean CLAY 26 R4 Driveway Northeast Side of Major "A" Olive brown silty lean CLAY 24 R5 Parking Area South of Shop "F Olive brown clayey SILT 39 R6 Parking Area Southeast of Shop "G" Pale brown clayey SILT with sand 53 R7 Driveway South of Shop "G" Gray silty SAND 60 R8 Parking Area Northwest of Major "A" Pale brown SILT with sand 51 R9 Main East-West Driveway (North of Shop "E") Pale brown clayey SILT 34 RIO Driveway West of Shop "F" Gray clayey SILT 29 Ri I Parking Area East of Pad "B" Dark gray silty lean CLAY 25 R12 Main East-West Driveway (North of Major "A") Yellow brown clayey SILT with sand 34 R13 Driveway South Side of Major "A" Pale yellow brown clayey SILT 51 R14 Driveway South of Shop "E' Yellow brown silty lean CLAY 22 R15 Driveway South of Major "B" Pale yellow brown lean CLAY with sand 30 [_ f6 Main East-West Driveway (South of Shop "B') Gray silty SAND 57 C-2 I I I I I I I I I I I I I I I I I I I 971009-051 APPENDIX C (continue) Laboratory Testing Procedures and Test Results AC Laboratory Maximum Density Tests: The laboratory maximum density of the asphalt concrete sample was provided by the AC supplier. The values are presented in the table below: Sample Number Laboratory Density (pcf) AC1 146.0 AC2 143.0 C-3 I H I I I I I I I I I Li I 1 I j I I U 971009-051 APPENDIX C Laboratory Testing Procedures and Test Results Maximum Density Tests: The maximum dry density and optimum moisture content of typical materials were determined in accordance with ASTM Test Method D1557. The results of these tests are presented in the table below: Sample Number Sample Description Maximum Dr Dry Density (pcf) Optimum Moisture Content (%) 1 Olive gray silty to clayey SAND 110.0 17.0 2 Olive brown silty to clayey SAND 116.0 14.0 3 Yellow brown clayey SAND 116.0 13.5 4 Light olive brown silty to clayey SAND 113.0 16.0 5 Pale olive brown silty to clayey SAND 118.0 13.0 6 Gray silty SAND 116.0 14.0 7 Brown clayey SAND 111.5 17.5 8 Brown silty SAND (import) 133.5 9.0 9 Light brown silty to clayey SAND 112.0 15.5 10 Recycled Class II Base 125.5 10.0 11 Recycled Class II Base 130.0 9.0 12 Recycled Class II Base 127.0 6.5 13 Recycled Class II Base 131.1 7.8 C-i 971009-051 APPENDIX C (continue) Laboratory Testing Procedures and Test Results "R"-Value: The resistance "R"-value was determined by the California Materials Method No. 301 for subgrade soils. The samples were prepared and exudation pressure and "R"-value determined on each one. The graphically determined "R"-value exudation pressure of 300 psi is summarized in the table below: Sample Number Sample Location Sample Description h-Value RI Driveway Adjacent to Pad "A" Yellow brown clayey SAND 32 Ri Parking Area North of Major C" Yellow brown clayey SAND 46 R3 Parking Area South of Shop "D" Olive brown silty lean CLAY 26 R4 Driveway Northeast Side of Major "A" Olive brown silty lean CLAY 24 R5 Parking Area South of Shop "F" Olive brown clayey SILT 39 R6 Parking Area Southeast of Shop "G" Pale brown clayey SILT with sand 53 R7 Driveway South of Shop 'G" Gray silty SAND 60 R8 Parking Area Northwest of Major "A" Pale brown SILT with sand 51 R9 Main East-West Driveway (North of Shop "E") Pale brown clayey SILT 34 RIO Driveway West of Shop "F" Gray clayey SILT 29 Ri 1 Parking Area East of Pad "B" Dark gray silty lean CLAY 25 Ri2 Main East-West Driveway (North of Major "A") Yellow brown clayey SILT with sand 34 R13 Driveway South Side of Major "A" Pale yellow brown clayey SILT 51 R14 Driveway South of Shop "E" Yellow brown silty lean CLAY 22 R15 Driveway South of Major "B" Pale yellow brown lean CLAY with sand 30 R16 Main East-West Driveway (South of Shop "B") Gray silty SAND 57 C-2 I, I I I I , I I I I I I 1 I I I, I . I. 1 971009-051 APPENDIX C (continue) Laboratory Testing Procedures and Test Results AC Laboratory Maximum Density Tests: The laboratory maximum density of the asphalt concrete sample was provided by the AC supplier. The values are presented in the table below: Sample Number Laboratory Density (pcf) AC! 146.0 AC2 143.0 C-3