Loading...
HomeMy WebLinkAboutCT 06-24; BRESSI RANCH VILLAGE CENTER; WATER SYSTEM ANALYSIS; 2007-11-02I I I I I I I I I I I I I I I I I I I CT WATER SYSTEM ANALYSIS FOR THE BRESSI RANCH COMMERCIAL SITE November 2,2007 J(ECEIVE.f'" NO\! 07 10Gl ENG\NEER.\NC ~-?t DEPARTMEN1 Prepared By: Dexter Wilson Engineering, Inc. 2234 Faraday Avenue Carlsbad, CA 92008 Job No: 869-001 C' ~ ~1 ~ ~-; ~ .. ~ 0 -= =~ .-== Ja I I I I I I I I I I I I I I I I I I I November 2, 2007 LNR Property Corporation 4275 Executive Square, Suite 210 La Jolla, CA 92037 Attention: Jeff Williams, Project Manager Subject: Water System Analysis for the Bressi Ranch Commercial Site 869-001 This letter summarizes our analysis and recommendations for providing water service. to the Bressi Ranch Commercial Site development. The proposed development consists of 122,092 square feet of building space over 8 lots on 13.72 acres of the Bressi Ranch project. The project is located within the Carlsbad Municipal Water District's .550 Water Pressure Zone. This area of the system is supplied by a 550 Zone Pressure Reducing Station. Existing water service lines within the vicinity of the Bressi Ranch Commercial Site include 12-inch 550 Zone water lines in Gateway Road, EI Fuerte Street, Bressi Ranch Way, Finnila Place and Town Garden Road. Purpose of Study A water system analysis dated October 22, 2002 (revised November 5, 2003) was prepared for the Bressi Ranch project which includes the Commercial Site. This study identified the backbone water facilities necessary to serve the overall project, but did not identify how onsite water service would be provided to the commercial area. The purpose of this study is to identify the proposed water system layout necessary to provide domestic and fire protection service to the Commercial Site. I I I I I I I I I I I I I I I I I I I Jeff Williams November 2, 2007 Page 2 Water Demands The two demands used to design the system are domestic demands from the building and fire flow demands. The projected water fixture units for the buildings have not yet been established. As a result, this water study shows the locations of proposed building water services, but the sizes are to be determined at a later date. Domestic water demands were approximated based on the City of Carlsbad's Engineering Standards, Volume 2 for Potable Water Design Guidelines. Per this document, a commercial average day demand factor of 2,300 gpd/10,000 ft2 was utilized. Maximum day demand and peak hour demands were calculated based on the peaking factors of 1.65 and 2.9, respectively, times the average day demand. A summary of building square footage, associated demands, and hydraulic n;l.odel reference (Node #) can be found in Appendix A. A design fire flow rate of 4,000 gpm was used in the fire system analysis, based on the 2003 Carlsbad Municipal Water District Water Master Plan. Fire sprinkler pipe sizing and design are not considered in this water system analysis and will be p.rovided by others. Proposed Domestic Water System Based on finish floor elevations ranging from 402 to 410.5 feet, the maximum onsite static pressure with service from the 550 Zone ranges from 60.4 to 64.1 psi. Proposed water lines to serve the Bressi Ranch Commercial Site shall be 8-inch and 12-inch. The proposed water lines shall connect to existing water lines within the Bressi Ranch project in four locations. Figure 1 provides the recommended water facilities for the project. I I I I I I I I I I I I I I I I I I I Jeff Williams November 2, 2007 Page 3 Computer Model The KYPIPE computer analysis developed by the UJ?iversity of Kentucky was utilized to determine residual pressures throughout the distribution system. This computer model utilizes the Hazen-Williams Equation to determine dynamic losses in the piping system. A Hazen-Williams "C" Factor of 120 was used in our analysis. Although this factor is conservative for PVC piping, we felt it appropriate to allow for pipe aging and other minor losses in the backbone distribution system. To determine the appropriate input hydraulic gradeline for the computer model, we relied on the November 5, 2003 Potable and Reclaimed Water System Analysis for Bressi Ranch. Table 1 summarizes the available hydraulic gradeline' at the intersection of Bressi Ranch Way and El Fuerte Street (Node 502 from the 11103 Study), TABLE 1 AVMLABLEHGLSUMMARY Avera e Da Demand Peak Hour Demand Max Day + 4,000 GPM Fire Flow 546 526 .-I , ~ __ ....J ' --, ~ ",,"", "" " \ J " CONNECT TO • " /EXISTING 12 ..... WATER UNE " , )', '-~ ~~ N~ ~ ~ I U) " t· -----Q: l:r ~ I· """ ~ bP l/e1(7'e 87'1(;;,----7-- 1 ,,,_ ~ I 1 ~~/---­ ____ u 1""--- I I I I CONNECT TO EXISTING 12" WATER LINE LEGE~D ... PO:l --® PfOPOSE~ 550 ZONE WATER UNE EIISTING 550 ZONE WATER LINE PjOPOSE9 FIRE HYDRANT EXISTING FftRE HYDRANT PRbpOSEDI WATER SERVICE BOYS AND GIRLS CLUB -, _-J.. _ ___." " -"----It I --r-oJ ~2._ _I '---..,... ..... \ \PACIFIC\DWG\869001\FIGURE-1.DWG 11-01-07 12:53: 37 LAYOUT: MODEL / I PROPOSED MAJOR "A" FF=405.0 I / I I I ~ I ~I ~/ iJJ/ / I I / /'" ..... 1 / ,~.~ ~"). / /.p ~~"" " :'-----N eII ,.-" BRESS] _Y!_~-' / / / "" / -~ -' n~ " \~ " t-.'/-. • ----------- NOTESI 1. ALL WATER LINES ARE 550 ZONE. 2. BU I LD I NG PROPOSED MAJOR ' C' SERVED BY EXISTING WATER LINE • FIGURE 1 BRESSI RANCH COMMERCIAL SITE PROPOSED WATER FACILITIES I I I I I I I I I I I I I I I I I I I Jeff Williams November 2, 2007 Page 5 Fire Flow Analysis The proposed onsite water lines were sized based on the required fire flow for the buildings within the project. The November 5, 2003 water study included hydraulic modeling of the water system to ensure that fire flow requirements could be met throughout the system, including a fire flow rate of 4,000 gpm for the industrial areas. For the on site analysis in this study, the 4,000 gpm fire flow was split evenly between two adjacent hydrants. Appendix B provides a hydraulic model of the onsite system to ensure that the fire flow requirements are met with the proposed onsite piping configuration. The results of the hydraulic analysis indicate that the piping has been adequately sized to supply the domestic and fire protection needs of the project. Exhibit A provides the node and pipe diagram that corresponds with the hydraulic model. Thank you for the opportunity to work on your project. If you have any questions or require additional information, please let us know. Dexter Wilson Engineering, Inc. Stephen M. Nielsen SMN:sbr I I I APPENDIX A I BUILDING REFERENCE DATA I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I BRESSI RANCH COMMERCIAL SITE BUILDING DEMAND Proposed Major "A" 43,830 7.00 11.55 20.30 Proposed Major "B" 17,285 2.76 4.56 8.01 . Proposed Major "C" 12,007 1.92 3.16 5.56 Proposed Pad "A" 5,070 0.81 1.34 2.35 Proposed Pad "B" 4,500 0.72 1.19 2.08 Proposed Shop "A" 4,780 0.76 1.26 2.21. Proposed Shop "B" 5,880 0.94 1.55 2.72 . Proposed Shop "e" 4,960 0.79 1.31 2.30 Proposed Shop "D" 8,400 1.34 2.21 3.89 Proposed Shop "E" 4,880 0.78 1.29 2.26 Proposed Shop "F" 5,860 0.94 1.54 2.71 Proposed Shop "G" 4,640 0.74 1.22 2.15 ADD = Average Day Demand MDD = Maximum Day Demand PH = Peak Hour Demand ** Domestic demand served by existing 12-inch in Town Garden Road 20 8 110 2 12 12 12 12 8 26 14 16 I I I APPENDIXB I COMPUTER MODELING OUTPUT I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I The following conditions were modeled: 1. Average day demands 2. Peak hour demands 3. Maximum day demands plus 4,000 gpm fire flow at Nodes 2 and 104 4. Maximum day demands plus 4,000 gpm fire flow at Nodes 12 and 14 5. Maximum day demands plus 4,000 gpm fire flow at Nodes 14 and 16 6. Maximum day demands plus 4,000 gpm fire flow at Nodes 18 and 26 I I I I I I I I I I I I I I I I I I I TABLE B-1 COMPUTER MODELING SUMMARY Average Day Demands 60.4 64.1 60.4 64.1 40 Yes 0.03 Peak Hour Demands 60.4 64.1 58.7 62.4 t/ 40 Yes 0.09 Max. Day Demands Plus 4,000 ) J GPM Fire at Nodes 2 and 104 60.4 64.1 39.5 52.6 20 Yes 12.773 Max. Day Demands Plus 4,000 , GPM Fire at Nodes 12 and 14 60.4 64.1 34.9 50.8 20 Yes 12.803 Max. Day Demands Plus 4,000 GPM Fire at Nodes 14 and 16 60.4 64.1 46.6 50.9 J 20 Yes 6.45 Max. Day Demands Plus 4,000 I GPM Fire at Nodes 18 and 26 60.4 64.1 39.2 50.5 20 Yes 12.763 1 Based on 550 Foot Supply HGL 2 For onsite area only 3 Velocities of greater than 8.0 ft/s only occur in 8-inch dead end pipes during a fire flow scenario. Given that pressure and flow requirements are met, we recommend leaving these lines as 8-inch due to water quality concerns. I BRESSI RANCH COMMERCIAL SITE WATER SYSTEM ANALYSIS 11-01-07 I I FLOWRATE IS EXPRESSED IN GPM AND PRESSURE IN PSIG I A SUMMARY OF THE ORIGINAL DATA FOLLOWS I I PIPE NO. NODE NOS. LENGTH DIAMETER ROUGHNESS MINOR LOSS K FIXED GRADE (FEET) (INCHES) 3 2 4 120.0 8.0 120.0 .00 5 108 4 180.0 8.0 120.0 .00 I 7 110 6 250.0 12.0 120.0 .00 9 6 8 120.0 12.0 120.0 .00 11 6 10 120.0 12.0 120.0 .00 I 13 10 12 340.0 8.0 120.0 .00 15 10 14 50.0 12.0 120.0 .00 17 14 16 280.0 12.0 120.0 .00 19 16 18 300.0 12.0 120.0 .00 I 21 18 20 25.0 12.0 120.0 .00 23 116 20 200.0 12.0 120.0 .00 25 20 22 275.0 12.0 120.0 .00 27 22 24 50.0 12.0 120.0 .00 I 29 24 6 225.0 12.0 120.0 .00 31 22 26 340.0 8.0 120.0 .00 101 0 102 120.0 12.0 120.0 .00 550.00 I 103 102 104 120.0 12.0 120.0 .00 105 104 106 80.0 12.0 120.0 .00 107 106 108 180.0 12.0 120.0 .00 109 108 110 230.0 12.0 120.0 .00 I 111 110 112 100.0 12.0 120.0 .00 113 106 114 475.0 12.0 120.0 .00 115 114 116 440.0 12.0 120.0 .00 I 117 116 118 80.0 12.0 120.0 .00 119 118 120 375.0 12.0 120.0 .00 121 120 122 1400.0 12.0 120.0 .00 123 122 112 400.0 12.0 120.0 .00 I 125 0 120 100.0 12.0 120.0 .00 550.00 JUNCTION NUMBER DEMAND ELEVATION CONNECTING PIPES I 2 .81 408.00 3 4 .00 406.00 3 5 6 .00 407.00 7 9 11 29 I 8 4.10 407.00 9 10 .00 408.00 11 13 15 12 3.21 410.00 13 14 .94 408.00 15 17 I 16 .74 407.00 17 19 18 .00 404.00 19 21 20 7.00 404.00 21 23 25 I 22 .00 405.00 25 27 31 I I I I I I I I I I I I I I I I I I I I BRESSI RANCH COMMERCIAL SITE WATER SYSTEM ANALYSIS 11-01-07 24 .00 406.00 27 29 26 .78 402.00 31 102 .00 405.00 101 103 104 .00 410.50 103 105 106 .00 410.00 105 107 113 108 .00 406.00 5 107 109 110 1. 92 408.00 7 109 111 112 .00 408.00 111 123 114 .00 405.00 113 115 116 .00 385.00 23 115 117 118 .00 380.00 117 119 120 .00 350.00 119 121 125 122 .00 390.00 121 123 OUTPUT SELECTION: ALL RESULTS ARE OUTPUT EACH PERIOD 3 VALUES ARE OUTPUT FOR MAXIMUM AND MINIMUM PRESSURES THIS SYSTEM HAS 28 PIPES WITH 24 JUNCTIONS , 3 LOOPS AND 2 FGNS I BRESSI RANCH COMMERCIAL SITE WATER SYSTEM ANALYSIS 11-01-07 I THE RESULTS ARE OBTAINED AFTER 12 TRIALS WITH AN ACCURACY .00006 BRESSI RANCH I COMMERCIAL SITE WATER SYSTEM ANALYSIS -AVERAGE DAY DEMANDS I PIPE NO. NODE NOS. FLOWRATE HEAD LOSS PUMP HEAD MINOR LOSS VELOCITY HL/1000 3 2 4 -.81 .00 .00 .00 -.01 .00 5 108 4 .81 .00 .00 .00 .01 .00 I 7 110 6 7.07 .00 .00 .00 .02 .00 9 6 8 4.10 .00 .00 .00 .01 .00 11 6 10 3.12 .00 .00 .00 .01 .00 I 13 10 12 3.21 .00 .00 .00 .02 .00 15 10 14 -.09 .00 .00 .00 .00 .0.0 17 14 16 -1. 03 .00 .00 .00 .00 .00 19 16 18 -1.77 .00 .00 .00 -.01 .00 I 21 18 20 -1.77 .00 .00 .00 -.01 .00 23 116 20 9.70 .00 .00 .00 .03 .00 25 20 22 .93 .00 .00 .00 .00 .,00 I 27 22 24 .15 .00 .00 .00 .00 .00 29 24 6 .15 .00 .00 .00 .00 .00 31 22 26 .78 .00 .00 .00 .00 .00 101 0 102 8.91 .00 .00 .00 .03 .00 I 103 102 104 8.91 .00 .00 .00 .03 .00 105 104 106 8.91 .00 .00 .00 .03 .00 107 106 108 6.15 .00 .00 .00 .02 .00 109 108 110 5.34 .00 .00 .00 .02 .00 I 111 110 112 -3.64 .00 .00 .00 -.01 .00 113 106 114 2.76 .00 .00 .00 .01 .00 115 114 116 2.76 .00 .00 .00 .01 .00 I 117 116 118 -6.94 .00 .00 .00 -.02 .00 119 118 120 -6.94 .00 .00 .00 -.02 .00 121 120 122 3.64 .00 .00 .00 .01 .00 123 122 112 3.64 .00 .00 .00 .01 .00 I 125 0 120 10.59 .00 .00 .00 .03 .00 I JUNCTION NUMBER DEMAND GRADE LI'NE ELEVATION PRESSURE 2 .81 550.00 408.00 61. 53 4 .00 550.00 406.00 62.40 6 .00 550.00 407.00 61.97 I 8 4.10 550.00 407.00 61. 97 10 .00 550.00 408.00 61. 53 12 3.21 550.00 410.00 60.67 I 14 .94 550.00 408.00 61.53 16 .74 550.00 407.00 61.97 18 .00 550.00 404.00 63.27 20 7.00 550.00 404.00 63.27 I 22 .00 550.00 405.00 62.83 24 .00 550.00 406 .. 00 62.40 26 .78 550.00 402.00 64.13 102 .00 550.00 405.00 62.83 I 104 .00 550.00 410.50 60.45 106 .00 550.00 410.00 60.67 108 .00 550.00 406.00 62.40 I 110 1. 92 550.00 408.00 61.53 I I I I I I I I I I I I I I I I I I I I BRESSI RANCH COMMERCIAL SITE WATER SYSTEM ANALYSIS 112 .00 550.00 408.00 61.53 114 .00 550.00 405.00 62.83 116 .00 550.00 385.00 71.50 118 .00 550.00 380.00 73.67 120 .00 550.00 350.00 86.67 122 .00 550.00 390.00 69.33 MAXIMUM PRESSURES 120 .00 550.00 350.00 86.67 118 .00 550.00 380.00 73.67 116 .00 550.00 385.00 71. 50 MINIMUM PRESSURES 104 .00 550.00 410.50 60.45 12 3.21 550.00 410.00 60.67 106 .00 550.00 410.00 60.67 THE NET SYSTEM DEMAND = 19.50 SUMMARY OF INFLOWS(+) AND OUTFLOWS(-) FROM FIXED GRADE NODES PIPE NUMBER FLOWRATE 101 8.91 125 10.59 THE NET FLOW INTO THE SYSTEM FROM FIXED GRADE NODES = THE NET FLOW OUT OF THE SYSTEM INTO FIXED GRADE NODES = 19.50 .00 11-01-07 I BRESSI RANCH COMMERCIAL SITE WATER SYSTEM ANALYSIS 11-01-07 I A SUMMARY OF CONDITIONS SPECIFIED FOR THE NEXT SIMULATION FOLLOWS I THE DEMANDS ARE CHANGED FROM ORIGINAL VALUES BY A FACTOR 2.90 THE FOLLOWING CHANGES IN PIPE DATA ARE SPECIFIED I FOR PIPE NUMBER 101 THE VALUE OF THE FIXED GRADE IS CHANGED TO 546.0 FOR PIPE NUMBER 125 THE VALUE OF THE FIXED GRADE IS CHANGED TO 546.0 I THE RESULTS ARE OBTAINED AFTER 2 TRIALS WITH AN ACCURACY .00000 I BRESSI RANCH COMMCERCIAL SITE PEAK HOUR DEMANDS I PIPE NO. NODE NOS. FLOWRATE HEAD LOSS PUMP HEAD MINOR LOSS VELOCITY HL/I000 I 3 2 4 -2.35 .00 .00 .00 -.01 .00 5 108 4 2.35 .00 .00 .00 .01 .00 7 110 6 20.50 .00 .00 .00 .06 .00 9 6 8 11. 89 .00 .00 .00 .03 .00 I 11 6 10 9.04 .00 .00 .00 .03 .00 13 10 12 9.31 .00 .00 .00 .06 .00 15 10 14 -.27 .00 .00 .00 .00 .00 17 14 16 -2.99 .00 .00 .00 -.01 .00 I 19 16 18 -5.14 .00 .00 .00 -.01 .00 21 18 20 -5.14 .00 .00 .00 -.01 .00 23 116 20 28.14 .00 .00 .00 .08 .00 I 25 20 22 2.70 .00 .00 .00 .01 .00 27 22 24 .44 .00 .00 .00 .00 .00 29 24 6 .44 .00 .00 .00 .00 .00 31 22 26 2.26 .00 .00 .00 . Cll .00 I 101 0 102 25.85 .00 .00 .00 .07 .00 103 102 104 25.85 .00 .00 .00 .07 .00 105 104 106 25.85 .00 .00 .00 .07 .00 I 107 106 108 17.85 .00 .00 .00 .05 .00 109 108 110 15.50 .00 .00 .00 .04 .00 111 110 112 -10.56 .00 .00 .00 -.03 .00 113 106 114 8.00 .00 .00 .00 .02 .00 I 115 114 116 8.00 .00 .00 .00 .0·2 .00 117 116 118 -20.14 .00 .00 .00 -.06 .00 119 118 120 -20.14 .00 .00 .00 -.06 .00 121 120 122 10.56 .00 .00 .00 .03 .00 I 123 122 112 10.56 .00 .00 .00 .03 .00 125 0 120 30.70 .00 .00 .00 .09 .00 I JUNCTION NUMBER DEMAND GRADE LINE ELEVATION PRESSURE 2 2.35 546.00 408.00 59.80 4 .00 546.00 406.00 60.67 I 6 .00 546.00 407.00 60.23 8 11. 89 546.00 407.00 60.23 10 .00 546.00 408.00 59.80 I 12 9.31 546.00 410.00 58.93 I I I I I I I I I I I I I I I I I I I I BRESSI RANCH COMMERCIAL SITE WATER SYSTEM ANALYSIS 14 16 18 20 22 24 26 102 104 106 108 110 112 114 116 118 120 122 120 118 116 104 12 106 2.73 2.15 .00 20.30 .00 .00 2.26 .00 .00 .00 .00 5.57 .00 .00 .00 .00 .00 .00 MAXIMUM .00 .00 .00 MINIMUM .00 9.31 .00 546.00 546.00 546.00 546.00 546.00 546.00 546.00 546.00 546.00 546.00 546.00 546.00 546.00 546.00 546.00 546.00 546.00 546.00 PRESSURES 546.00 546.00 546.00 PRESSURES 546.00 546.00 546.00 THE NET SYSTEM DEMAND = 56.55 408.00 407.00 404.00 404.00 405.00 406.00 402.00 405.00 410.50 410.00 406.00 408.00 408.00 405.00 385.00 380.00 350.00 390.00 350.00 380.00 385.00 410.50 410.00 410.00 59.80 60.23 61. 53 61. 53 61.10 60.67 62.40 61.10 58.72 58.93 60.67 59.80 59.80 61.10 69.77 71. 93 84.93 67.60 84.93 71.93 69.77 58.72 58.93 58.93 SUMMARY OF INFLOWS(+) AND OUTFLOWS(-) FROM FIXED GRADE NODES PIPE NUMBER 101 125 FLOWRATE 25.85 30.70 THE NET FLOW INTO THE SYSTEM FROM FIXED GRADE NODES = THE NET FLOW OUT OF THE SYSTEM INTO FIXED GRADE NODES 56.55 .00 11-01-07 I BRESSI RANCH COMMERCIAL SITE WATER SYSTEM ANALYSIS . 11-01-07 I A SUMMARY OF CONDITIONS SPECIFIED FOR THE NEXT SIMULATION FOLLOWS I THE DEMANDS ARE CHANGED FROM ORIGINAL VALUES BY A FACTOR :L.65 THE FOLLOWING SPECIFIC DEMAND CHANGES ARE MADE : I JUNCTION NUMBER DEMAND 2 2001.39 104 2000.00 I THE FOLLOWING CHANGES IN PIPE DATA ARE SPECIFIED FOR PIPE NUMBER 101 THE VALUE OF THE FIXED GRADE IS CHANGED TO 526.0 I FOR PIPE NUMBER 125 THE VALUE OF THE FIXED GRADE IS CHANGED TO 526.0 I THE RESULTS ARE OBTAINED AFTER 4 TRIALS WITH AN ACCURACY .00085 BRESSI RANCH COMMERICAL SITE MAXIMUM DAY DEMANDS PLUS 4000 GPM FIRE FLOW I SPLIT BETWEEN NODES 2 AND 104 I PIPE NO. NODE NOS. FLOWRATE HEAD LOSS PUMP HEAD MINOR LOSS VELOCITY HLjl000 3 2 4 -2001.39 -9.19 .00 .00 -12.77 -76.58 5 108 4 2001. 39 13.79 .00 .00 12.77 76.58 7 110 6 -511. 68 -.21 .00 .00 -1. 45 -.85 I 9 6 8 6.76 .00 .00 .00 .02 .00 11 6 10 -232.19 -.02 .00 .00 -.66 -.20 13 10 12 5.30 .00 .00 .00 .03 .00 I 15 10 14 -237.49 -.01 .00 .00 -.67 -.21 17 14 16 -239.04 -.06 .00 .00 -.68 -.21 19 16 18 -240.26 -.06 .00 .00 -.68 -.21 21 18 20 -240.26 -.01 .00 .00 -.68 -.21 I 23 116 20 539.35 .19 .00 .00 1. 53 .94 25 20 22 287.54 .08 .00 .00 .82 .29 27 22 24 286.26 .01 .00 .00 .81 .29 29 24 6 286.26 .07 .00 .00 .81 .29 I 31 22 26 1.29 .00 .00 .00 .01 .00 101 0 102 2318.69 1. 68 .00 .00 6.58 13.96 103 102 104 2318.69 1. 68 .00 .00 6.58 13.96 I 105 104 106 318.69 .03 .00 .00 .90 .35 107 106 108 890.36 .43 .00 .00 2.53 2.37 109 108 110 -1111.03 -.82 .00 .00 -3.15 -3.57 111 110 112 -602.51 -.12 .00 .00 -1. 71 -1.15 I 113 106 114 -571. 68 -.50 .00 .00 -1. 62 -1:04 115 114 116 -571. 68 -.46 .00 .00 -1. 62 -1.04 117 116 118 -1111.03 -.29 .00 .00 "'3.15 -3.57 I 119 118 120 -1111.03 -1. 34 .00 .00 -3.15 -3.57 121 120 122 602.51 1. 61 .00 .00 1. 71 1.15 123 122 112 602.51 .46 .00 .00 1. 71 1.15 125 0 120 1713.54 .80 .00 .00 4.86 7.97 I JUNCTION NUMBER DEMAND GRADE LINE ELEVATION PRESSURE I 2 2001.39 499.22 408.00 39.53 I I I I I I I I I I I I I I I I I I I I BRESSI RANCH COMMERCIAL SITE WATER SYSTEM ANALYSIS 11-01-07 4 .00 50B.41 406.00 44.3B 6 .00 523.23 407.00 50.37 B 6.76 523.23 407.00 50.37 10 .00 523.25 40B.00 49.94 12 5.30 523.25 410.00 49.0B 14 1. 55 523.26 40B.00 49.95 16 1. 22 523.32 407.00 50.41 18 .00 523.38 404.00 51. 73 20 11. 55 523.39 404.00 51. 74 22 .00 523.31 405.00 51.27 24 .00 523.29 406.00 50.B3 26 1. 29 523.31 402.00 52.57 102 .00 524.32 405.00 51.71 104 2000.00 522.65 410.50 48.60 106 .00 522.62 410.00 4B.80 lOB .00 522.19 406.00 50.35 110 3.17 523.02 40B.00 49.B4 112 .00 523.13 408.00 49.89 114 .00 523.12 405.00 51.1B 116 .00 523.58 3B5.00 60.05 lIB .00 523.B6 380.00 62.34 120 .00 525.20 350.00 75.92 122 .00 523.59 390.00 57.89 MAXIMUM PRESSURES 120 .00 525.20 350.00 75.92 lIB .00 523.B6 3BO.00 62.34 116 .00 523.5B 385.00 60.05 MINIMUM PRESSURES 2 2001.39 499.22 40B.00 39.53 4 .00 50B.41 406.00 44.3B 104 2000.00 522.65 410.50 4B.60 THE NET SYSTEM DEMAND = 4032.23 SUMMARY OF INFLOWS(+) AND OUTFLOWS(-) FROM FIXED GRADE NODES PIPE NUMBER FLOWRATE 101 231B.69 125 1713.54 THE NET FLOW INTO THE SYSTEM FROM FIXED GRADE NODES = 4032.23 THE NET FLOW OUT OF THE SYSTEM INTO FIXED GRADE NODES .00 I BRESSI RANCH COMMERCIAL SITE WATER SYSTEM ANALYSIS 11-01-07 I A SUMMARY OF CONDITIONS SPECIFIED FOR THE NEXT SIMULATION FOLLOWS I THE DEMANDS ARE CHANGED FROM ORIGINAL VALUES BY A FACTOR 1. 65 THE FOLLOWING SPECIFIC DEMAND CHANGES ARE MADE : I JUNCTION NUMBER DEMAND 12 2005.33 14 2001.55 I THE RESULTS ARE OBTAINED AFTER 3 TRIALS WITH AN ACCURACY .00065 I BRESSI RANCH COMMERCIAL SITE MAXIMUM DAY DEMANDS PLUS 4000 GPM FIRE FLOW SPLIT EVENLY BETWEEN NODES 12 AND 14 I PIPE NO. NODE NOS. FLOWRATE HEAD LOSS PUMP HEAD MINOR LOSS VELOCITY HL/1000 3 2 4 -1. 34 .00 .00 .00 -.01 .00 I 5 108 4 1. 34 .00 .00 .00 .01 .00 7 110 6 1952.64 2.54 .00 .00 5.54 10.16 9 6 8 6.76 .00 .00 .00 .02 .00 11 6 10 2659.43 2.16 .00 .00 7.54 18.00 I 13 10 12 2005.33 26.13 .00 .00 12.80 76.86 15 10 14 654.10 .07 .00 .00 1. 86 1. 34 17 14 16 -1347.45 -1. 43 .00 .00 -3.82 -5.11 19 16 18 -1348.67 -1. 54 .00 .00 -3.83 -5.12 I 21 18 20 -1348.67 -.13 .00 .00 -3.83 -5.12 23 116 20 2075.06 2.27 .00 .00 5.89 11. 37 25 20 22 714.84 .43 .00 .00 2.03 1.58 I 27 22 24 713.55 .08 .00 .00 2.02 1. 57 29 24 6 713.55 .35 .00 .00 2.02 1. 57 31 22 26 1.29 .00 .00 .00 .01 .00 101 0 102 1823.38 1. 07 .00 .00 5.17 8 .. 95 I 103 102 104 1823.38 1. 07 .00 .00 5.17 8.95 105 104 106 1823.38 .72 .00 .00 5.17 8.95 107 106 108 1205.87 .75 .00 .00 3.42 4.16 I 109 108 110 1204.54 .95 .00 .00 3.42 4.15 111 110 112 -751.27 -.17 .00 .00 -2.13 -1.73 113 106 114 617.50 .57 .00 .00 1. 75 1. 20 115 114 116 617.50 .53 .00 .00 1. 75 1.20 I 117 116 118 -1457.56 -.47 .00 .00 -4.13 -5.91 119 118 120 -1457.56 -2.22 .00 .00 -4.13 -5.91 121 120 122 751.27 2.42 .00 .00 2.13 1. 73 I 123 122 112 751.27 .69 .00 .00 2.13 1. 73 125 0 120 2208.83 1. 28 .00 .00 6 .. 27 12.76 I JUNCTION NUMBER DEMAND GRADE LINE ELEVATION PRESSURE 2 1. 34 522.39 408.00 49.57 4 .00 522.39 406.00 50.43 6 .00 518.89 407.00 48.49 I 8 6.76 518.89 407.00 48.49 10 .00 516.73 408.00 47.12 12 2005.33 490.60 410.00 34.93 I 14 2001. 55 516.67 408.00 47.09 I I I I I I I I I I I I I I I I I I I I BRESSI RANCH COMMERCIAL SITE WATER SYSTEM ANALYSIS 16 18 20 22 24 26 102 104 106 108 110 112 114 116 118 120 122 120 118 116 12 14 10 1. 22 .00 11. 55 .00 .00 1.29 .00 .00 .00 .00 3.17 .00 .00 .00 .00 .00 .00 MAXIMUM .00 .00 .00 MINIMUM 2005.33 2001.55 .00 518.10 519.63 519.76 519.33 519.25 519.33 524.93 523.85 523.14 522.39 521. 43 521.61 522.57 522.04 522.51 524.72 522.30 PRESSURES 524.72 522.51 522.04 PRESSURES 490.60 516.67 516.73 THE NET SYSTEM DEMAND = 4032.21 407.00 404.00 404.00 405.00 406.00 402.00 405.00 410.50 410.00 406.00 408.00 408.00 ·405.00 385.00 380.00 350.00 390.00 350.00 380.00 385.00 410.00 408.00 408.00 48.14 50.11 50.16 49.54 49.07 50.84 51. 97 49.12 49.03 50.43 49.15 49.23 50.94 59.38 61. 75 75.71 57.33 75.71 61.75 59.38 34.93 47.09 47.12 SUMMARY OF INFLOWS(+) AND OUTFLOWS(-) FROM FIXED GRADE NODES PIPE NUMBER 101 125 FLOWRATE 1823.38 2208.83 THE NET FLOW INTO THE SYSTEM FROM FIXED GRADE NODES = THE NET FLOW OUT OF THE SYSTEM INTO FIXED GRADE NODES 4032.21 .00 11-01-07 I BRESSI RANCH COMMERCIAL SITE WATER SYSTEM ANALYSIS 11-01-07 I A SUMMARY OF CONDITIONS SPECIFIED FOR THE NEXT SIMULATION FOLLOWS I THE DEMANDS ARE CHANGED FROM ORIGINAL VALUES BY A FACTOR 1. 65 THE FOLLOWING SPECIFIC DEMAND CHANGES ARE MADE : I JUNCTION NUMBER DEMAND 14 2001. 55 16 2001.21 I THE RESULTS ARE OBTAINED AFTER 3 TRIALS WITH AN ACCURACY .00221 I BRESSI RANCH COMMERCIAL SITE MAXIMUM DAY DEMANDS PLUS 4000 GPM FIRE FLOW SPLIT EVENLY BETWEEN NODES 14 AND 16 I PIPE NO. NODE NOS. FLOWRATE HEAD LOSS PUMP HEAD MINOR LOSS VELOCITY HL/1000 3 2 4 -1. 34 .00 .00 .00 -.01 .00 I 5 108 4 1.34 .00 .00 .00 .01 .00 7 110 6 1882.84 2.37 .00 .00 5.34 9.49 9 6 8 6.76 .00 .00 .00 .02 .00 11 6 10 2273.54 1. 62 .00 .00 6.45 13.46 I 13 10 12 5.30 .00 .00 .00 .03 .00 15 10 14 2268.24 .67 .00 .00 6.43 13.40 17 14 16 266.69 .07 .00 .00 .76 .25 19 16 18 -1734.52 -2.45 .00 .00 -4.92 -8.16 I 21 18 20 -1734.52 -.20 .00 .00 -4.92 -8.16 23 116 20 2144.82 2.42 .00 .00 6.08 12.08 25 20 22 398.76 .15 .00 .00 1.13 .54 I 27 22 24 397.47 .03 .00 .00 1.13 .53 29 24 6 397.47 .12 .00 .00 1.13 .53 31 22 26 1.29 .00 .00 .00 .01 .00 101 0 102 1814.31 1. 06 .00 .00 5.15 8.86 I 103 102 104 1814.31 1. 06 .00 .00 5.15 8.86 105 104 106 1814.31 .71 .00 .00 5.15 8.86 107 106 108 1156.42 .69 .00 .00 3.28 3.85 I 109 108 110 1155.08 .88 .00 .00 3.28 3.84 111 110 112 -730.92 -.16 .00 .00 -2.07 -1. 65 113 106 114 657.89 .64 .00 .00 1. 87 1.35 115 114 116 657.89 .60 .00 .00 1. 87 1. 35 I 117 116 118 -1486.93 -.49 .00 .00 -4.22 -6.13 119 118 120 -1486.93 -2.30 .00 .00 -4.22 -6.13 121 120 122 730.92 2.30 .00 .00 2.07 1. 65 123 122 112 730.92 .66 .00 .00 2.07 1. 65 I 125 0 120 2217.85 1. 29 .00 .00 6.29 12.86 I JUNCTION NUMBER DEMAND GRADE LINE ELEVATION PRESSURE 2 1. 34 522.47 408.00 49.60 4 .00 522.47 406.00 50.47 6 .00 519.21 407.00 48.63 I 8 6.76 519.21 407.00 48.63 10 .00 517.60 408.00 47.49 12 5.30 517.60 410.00 46.63 I 14 2001.55 516.93 408.00 47.20 I I I I I I I I I I I I I I I I I I I I BRESSI RANCH COMMERCIAL SITE WATER SYSTEM ANALYSIS 16 18 20 22 24 26 102 104 106 108 110 112 114 116 118 120 122 120 118 116 12 14 10 2001.21 .00 11. 55 .00 .00 1.29 .00 .00 .00 .00 3.17 .00 .00 .00 .00 .00 .00 MAXIMUM .00 .00 .00 MINIMUM 5.30 2001.55 .00 516.86 519.30 519.51 519.36 519.33 519.36 524.94 523.87 523.16 522.47 521. 59 521.75 522.52 521.92 522.41 524.71 522.41 PRESSURES 524.71 522.41 521. 92 PRESSURES 517.60 516.93 517.60 THE NET SYSTEM DEMAND = 4032.16 407.00 404.00 404.00 405.00 406.00 402.00 405.00 410.50 410.00 406.00 408.00 408.00 405.00 385.00 380.00 350.00 390.00 350.00 380.00 385.00 410.00 408.00 408.00 47.60 49.96 50.05 49.56 49.11 50.86 51. 97 49.13 49.04 50.47 49.22 49.29 50.93 59.33 61. 71 75.71 57.38 75.71 61. 71 59.33 46.63 47.20 47.49 SUMMARY OF INFLOWS(+) AND OUTFLOWS(-) FROM FIXED GRADE NODES PIPE NUMBER 101 125 FLOWRATE 1814.31 2217.85 THE NET FLOW INTO THE SYSTEM FROM FIXED GRADE NODES = THE NET FLOW OUT OF THE SYSTEM INTO FIXED GRADE NODES 4032.16 .00 11-01-07 I BRESSI RANCH COMMERCIAL SITE WATER SYSTEM ANALYSIS 11-01-07 I A SUMMARY OF CONDITIONS SPECIFIED FOR THE NEXT SIMULATION FOLLOWS I THE DEMANDS ARE CHANGED FROM ORIGINAL VALUES BY A FACTOR 1. 65 THE FOLLOWING SPECIFIC DEMAND CHANGES ARE MADE : I JUNCTION NUMBER DEMAND 18 2000.00 26 2000.00 I THE RESULTS ARE OBTAINED AFTER 4 TRIALS WITH AN ACCURACY .00053 I BRESSI RANCH COMMERCIAL SITE MAXIMUM DAY DEMANDS PLUS 4000 GPM FIRE FLOW SPLIT EVENLY BETWEEN NODES 18 AND 26 I PIPE NO. NODE NOS. FLOWRATE HEAD LOSS PUMP HEAD MINOR LOSS VELOCITY HL/I000 3 2 4 -1. 34 .00 .00 .00 -.01 .00 5 108 4 1. 34 .00 .00 .00 .01 .00 I 7 110 6 1772.85 2.12 .00 .00 5.03 8.49 9 6 8 6.76 .00 .00 .00 .02 .00 11 6 10 564.30 .12 .00 .00 1. 60 1. 02 I 13 10 12 5.30 .00 .00 .00 .03 .00 15 10 14 559.00 .05 .00 .00 1.59 1.00 17 14 16 557.45 .28 .00 .00 1. 58 1. 00 19 16 18 556.23 .30 .00 .00 1.58 .99 I 21 18 20 -1443.77 -.15 .00 .00 -4.10 -5.81 23 116 20 2253.53 2.65 .00 .00 6.39 13.24 25 20 22 798.21 .53 .00 .00 2.26 1. 94 I 27 22 24 -1201. 79 -.21 .00 .00 -3.41 -4.13 29 24 6 -1201.79 -.93 .00 .00 -3.41 -4.13 31 22 26 2000.00 26.01 .00 .00 12.76 76.49 101 0 102 1798.66 1. 05 .00 .00 5.10 8.72 I 103 102 104 1798.66 1. 05 .00 .00 5.10 8.72 105 104 106 1798.66 .70 .00 .00 5.10 8.72 107 106 108 1078.75 .61 .00 .00 3.06 3.38 109 108 110 1077.41 .78 .00 .00 3.06 3.38 I 111 110 112 -698.61 -.15 .00 .00 -1. 98 -1.51 113 106 114 719.91 .76 .00 .00 2.04 1. 60 115 114 116 719.91 .70 .00 .00 2.04 1. 60 I 117 116 118 -1533.62 -.52 .00 .00 -4.35· -6.4.9 119 118 120 -1533.62 -2.43 .00 .00 -4.35 -6.49 121 120 122 698.61 2.12 .00 .00 1. 98 1. 51 123 122 112 698.61 .61 .00 .00 1.98 1. 51 I 125 0 120 2232.22 1. 30 .00 .00 6.33 13.01 I JUNCTION NUMBER DEMAND GRADE LINE ELEVATION PRESSURE 2 1. 34 522.60 408.00 49.66 4 .00 522.60 406.00 50.53 6 .00 519.70 407.00 48.84 I 8 6.76 519.70 407.00 48.84 10 .00 519.58 408.00 48.3-5 12 5.30 519.58 410.00 47.48 I 14 1. 55 519.53 408.00 48.33 I I I I I I I I I I I I I I I I I I I I BRESSI RANCH COMMERCIAL SITE WATER SYSTEM ANALYSIS 16 18 20 22 24 26 102 104 106 108 110 112 114 116 118 120 122 120 118 116 26 12 14 1. 22 2000.00 11. 55 .00 .00 2000.00 .00 .00 .00 .00 3.17 .00 .00 .00 .00 .00 .00 MAXIMUM .00 .00 .00 MINIMUM 2000.00 5.30 1. 55 519.25 518.95 519.10 518.56 518.77 492.56 524.95 523.91 523.21 522.60 521. 82 521.97 522.45 521.74 522.26 524.70 522.58 PRESSURES 524.70 522.26 521.74 PRESSURES 492.56 519.58 519.53 THE NET SYSTEM DEMAND 4030.89 407.00 404.00 404.00 405.00 406.00 402.00 405.00 410.50 410.00 406.00 408.00 408.00 405.00 385.00 380.00 350.00 390.00 350.00 380.00 385.00 402.00 410.00 408.00 48.64 49.81 49.87 49.21 48.87 39.24 51. 98 49.14 49.06 50.53 49.32 49.39 50.89 59.26 61. 65 75.70 57.45 75.70 61.65 59.26 39.24 47.48 48.33 SUMMARY OF INFLOWS(+) AND OUTFLOWS(-) FROM FIXED GRADE NODES PIPE NUMBER FLOWRATE 101 1798.66 125 2232.22 THE NET FLOW INTO THE SYSTEM FROM FIXED GRADE NODES = THE NET FLOW OUT OF THE SYSTEM INTO FIXED GRADE NODES 4030.89 .00 11-01-07 ~--- ----I ~~ LEGEND P~OPOSE(j) 550 ZONE WATER LINE ---EJISTING b50 ZONE WATER LINE ... pJopos~ FIRE HYDRANT I>O<l EX\STING fflRE HYDRANT ~ CO~PUTERI MODEL NODE NUMBER [AJ COMPUTER \ MODEL PIPE NUMBER , ---- \ \PACIFIC\DWG\869001\EXHIBIT-A.DWG 11-01-07 12: 54: 21 LAYOUT: MODEL PROPOSED MAJOR "B" PROPOSED ',I MAJOR "A" . NOTES: 1 • ALL WATER LINES ARE 550 ZONE. 2. BUILDING PROPOSED MAJOR "C" SERVED BY EXISTING WATER LINE. .~ .. ~ N~ I .. ,~, . « (.,) en, EXHIBIT A BRESSI RANCH COMMERCIAL SITE NODE AND PIPE DIAGRAM .'~