Loading...
HomeMy WebLinkAboutCT 07-05; LA COSTA GREENS NEIGHBORHOOD 1.03; INTERIM REPORT OF TESTING & OBSERVATION FOR RETAINING WALL; 2009-02-04GEOCON INCORPORATED Project No. 06403752-32A February 4,. 2009 .. . '. / icl-oi.os EOTECHN!CAL CONSULTANTS ) CoiRich 4747 Morena Boulevard, Suite 100 San Diego, California 92117 . . . Attention: Ms. Teri Shusterman Subject: VILLAGES OF LA COSTA THE GREENS NEIGHBORHOOD 1.03 VERDURA WALL NOS. A THROUGH D INTERIM REPORT OF TESTING AND .QBSERVATION SERVICES FOR SEGMENTAL (GEOSYNTHETIC REINFORCED) RETAINING WALL References: 1. Update Geotechnical Report, Villages of La Costa, The Greens, Neighborhood 1.03, Lots 1 through 38, Carlsbad, California, prepared by Geocon Incorporated, dated February 7, 2008 (Project No. 06403-52-32): . Consultation - Geotechnical Parameters for Segmental Retaining Wall, Villages of. La Costa - The Greens, Neighborhood 1.03, Lots 1 through .38, Carlsbad, California, prepared by Geocon Incorporated, dated 'October, 6, 2008 (Project No. 06403-52-32A); "erdura Segmental Retaining Walls, .La Costa Greens, Neighborhood 1.3, Carlsbad, California, prepared by Southern California'Geotechnical, dated October 13, 2008, (Project No: CT07-05, Drawing No. 457-8A). Dear Ms. Shusterman: In accordance with the request of your onsite superintendent, Mr. Larry Willis, we have provided compaction jesting, and observation services during the construction of the segmental retaining wall (SRW) atihe subject project. We will prepare a final report 'subsequent to the completion of the remaining retaining walls. • , We, prformed our services on January 2, 2009 through January 21, 2009. The scope of our services included:' Performing testing and observation services during the installation of the subject wall. Providing geotechni'cal consultation during wall construction. 6960 Flanders Drive • San Diego California 92121-2974 0 Telephone (858) 558.6900 • Fax (858) 558-6159 Performing laboratory tests on soil'used for wall backfill to aid in evaluating the compaction characteristics (maximum dry density and optimum moisture content), shear strength, Atterberg Limits, and sieve analysis.. Preparing this report of geotechnical services performed during wall backfill operations. The Verdura segmental retaining walls with maximum height of approximately 7 feet were constructed along the southern portion of the subject site. The wall contractor was Soil Retention Design Incorporated. Prior to placing the wall units, a representative of Geocon Incorporated observed the footing excavations along the base of the wall. Our observations indicate the soil conditions exposed in the footings consisted of properly compacted fill or formational materials. The bearing strata at the base of the excavations are considered suitable for the. support of the retaining wall and the soil conditions encountered are consistent with those described in the referenced geotechnical report and letter. A wall drain, consisting of a 4-inch-diameter perforated drainpipe embedded in 3%-inch gravel and wrapped in filter fabric (Mirafi 140N or equivalent), was installed at the base of the backcut along the length of the wall and outlet at 50-foot intervals through the face of-the wall in substantial conformance with the referenced wall plans. The drain should be connected to an approved outlet or drainage system. Backfill material was placedand compacted in layers to the design elevations. In addition, the geogrid reinforcement was placed at locations in accordance with the referenced retaining wall plans. The geogrid reinforcement consisted of Mirafi SXT. During the backfill operations, we observed compaction procedures and performed in-place density tests using a nuclear gauge in substantial conformance with ASTM Test Procedure D 2922. Results of the field tests are summarized in Table I. In general, the in-place dry density test results indicate wall backfill materials possess a dry density of least 90 percent of the laboratory maximum dry density near to slightly above optimum moisture content at the locations tested. We performed laboratory tests on the, material used for backfill Jo evaluate moisture-density relationships, maximum dry density and optimum moisture content (ASTM D 1557), direct shear (ASTM D 3080), Atterberg Limits (ASTM D 4318), and particle size/sieve analysis (ASTM D 422). Laboratory test results are presented on Tables II through V. From a geotechnical engineering standpoint, it is the opinion of Geocon Incorporated the Verdura segmental retaining wall system was constructed in general conformance with the project plans and specifications. Project No. 06403-52-32A -2- February 4, 2009 Should you have any questions regarding this report, or if we may be of further service, please contact the undersigned at your convenience. Very truly yours, GEOCON INCORPORATED Michael C. Ertwine Sad awn Weedon Senior Staff Geologist EG 1778 GE 2714 MCE:AS:SW:dmc 0 (2) Addressee 'VO JA W del) ColRich Job Site AU Attention: Mr. Larry Willis R 01 CO cc 0 No. 2714 IL No. 1778 Exp. 06/30109 m Project No. 06403-52-32A 0 -3- February 4, 2009 TABLE I SUMMARY OF FIELD DENSITY TEST RESULTS Test No. Date Location Elev. or Depth t) Curve No. Plus 3/4" Rock (%) Field Dry Dens. (pCf) Field Moist. Cont. Field Rel. Comp. Reqd. Re!. Comp. VW 1 01/02/09 Wall C - Footing Area 10+75 307 5 0 102.0 16.9 90 90 VW 2 01/02/09 Wall C -Footing Area ll+65 309 4 0 105.8 16.1 91 90 VW 3 01/05/09 WallC10+40 306 1 0 113.3 12.0 91 90 VW 4 01/05/09 WallC11+00 310 1 0 111.9 12.8 90 90 VW 5 01/05/09 Wall C11+55 310 I 0 112.6 14.3 91 90 VW 6 01/05/09 Wall C10+70 ------------------------------------------------------------------------------------------------------------------------------------------------------------------------ 310 1 0 112.1 12.1 90 90 VW 7 01/06/08 Wall C11+75 311 1 0 111.8 11.6 90 90 VW 8 01/06/08 Wall Cl0+40 311 1 0 114.7 11.2 92 90 VW 9 01/06/08 Wall CIO+95 311 1 0 115.8 14.0 93 90 VW 10 01/06/08 Wall C11-s-35 312 1 0 116.0 12.0 93 90 VW iF 01/06/08 Wall C11+90 312 1 0 116.0 12.0 93 90 VW 12 01/06/08 Wall C10+55 310 1 0 113.0 12.4 91 90 VW 13 01/06/08 Wall C11+00 311 1 0 112.0 13.0 90 90 VW 14 01/08/09 Wall C10+95 311 1 0 113.4 15.0 91 90 VW 15- 01/08/09 WaliC 10+60 , 310 1 0 112.4 15.3 90 90 VW 16 01/08/09 Wall CII+45 313 1 0 111.6 12.8 90 90 VW 17 01/08/09 Wall C12+00 312 1 0 111.9 13.4 90 90 VW 18 01/09/09 Wall B - Footing Area 10+40 294 1 0 114.5 12.5 92 90 VW 19 01/09/09 Wall 10+65 292 1 0 111.8 13.3 90 90 VW 20 01/08/09 Wall B10+20 . 296 1 0 113.6 12.1 91 90 VW 21 01/12/09 WailA - Footing Area 10+60 ------------------------------------------------------------------------------------------------------------------------------------------------------------------------ 293 1 0 111.5 12.6 90 90 VW 22 01/12/09 Wall A1O-i-30 297 1 0 109.1 13.6 88 90 VW 22A 01/12/09 Wall A1O-i-30 297 1 0 113.2 12.9 91 90 VW 23 01/12/09 Wall Ai0+60 294, 1 0 111.9 11.7 90 90 VW 24 01/12/09 Wall A10+35 299 1 0 112.4 14.1 90 90. VW 25 01/13/09 Wall A10+55 294 1 0 111.8 11.6 90 90 VW 26 01/13/09 Wall AIO+20 301 1 0 115.0 12.4 93 90 VW 27 01/13/09 Wall A10+60 302 1 0 112.2 13.7 90 90 VW 28 01/13/09 Wall B- Footing Area l0+35 283 1 0 113.6 12.1 91 90 VW 29 01/13/09 Wall 10+15 286 1 0 114.7 11.8 92 90 VW , 30 01/14/09 Wall B 10+25 285 1 0 107.4 13.0 86 90 VW 30A 01/14/09 Wall 10+25 .285 1 0 112.5 13.8 91 90 VW 31 01/14/09 Wall 10+05 285 1 0 112.8 12.4 91 90 VW 32 01/14/09 Wall BIO+30 286 1 0 112.9 12.8 91 90 VW 33 01/14/09 Wall 10+15 . 287 1 0 112.4 12.4 90 90 VW 34 01/14/09 Wall B10+30 288 1 0 112.9 12.8 91 90 VW 35 01/15/09 WailD - Footing Area 10+10 299 1 0 113.1 13.2 91 90 VW 36 01/15/09 Wall D- Footing Area lO+15 301 1 0 111.7 11.8 90 90 VW 37 01/16/09' Wall. D- Footing Area lO+20 301 2 0 117.4 10.2 92 90 VW 38 01/16/09 Wall D10+45 303 2 . 0 118.6 11.3 93 90 VW 39 01/16/09 Wall Dl0+25 303 1 0 113.3 13.1 91 90 VW 40 01/16/09 Wa1lD10+40 304 1 0 111.9 12.6 90 90 VW 41 01/16/09 Wall D10+80 305 2 0 115.9 11.3 91 90 VW 42 01/16/09 Wall D11+20 307 1 0 114.7 11.4 92 90 VW 43 01/16/09 Wall D10+35 305 1 0 112.0 12.5 90 90 Project No. 06403-52-32B February 4, 2009 TABLE! SUMMARY OF FIELD DENSITY TEST RESULTS Elev. Plus Field Field Field Reqd. or 3/4 Dry Moist. Re!. Rel. Depth Curve Rock Dens. Cont. Comp. Comp. Test No. Date Location (t) No. (%) (D VW 44 01/20/09 Wall D 10+55 306 1 0 107.4 12.3 86 90 VW, 44A 01/20/09 Wall D10+55 306 1 0 113.4 12.9 91 90 VW 45 01/20/09 Wall 11+00. 308 2 0. 116.1 11.8 91 90 VW 46 01/20/09 Wall D11+30 309 2 0 114.7 13.2 90 90 VW 47 01/20/09 Wall D10+85 309 2 0 114.9 12.5 90 90 VW 48 01/21/09 Wall DIO+30 ------------------------------------------------------------------------------------------------------------------------------------------------------------------------- 306 1 0 111.5 13.0 90 90 VW 49 01/21/09 Wall D!l+05 310 1 0 112.8 11.5 91 90 VW 50 01/21/09 Wall 16+55 309 1 . 0 112.0 12.0 90 90 .VW 51 01/21/09 Wall Dl0-i-95 312 1 0 .114.0 13.9 92 90 VW 52 01/21/09 Wall D11+25 . 312 2 0 118.2 10.6 93 90 C / Project No. 06403-52-32B February 4, 2009 TABLE I - EXPLANATION OF CODED TERMS - TEST SUFFIX A, B, C,. . . : Retest of previous density test failure, following moisture conditioning and/or recompaction. - TRll(E-OUT— Fill in area of density test failure was removed and replaced with properly compacted fill soil. - PREFIX CODE DESIGNATION FOR TEST NUMBERS VW - Verdura Wall Backfill -CURVE NO. Corresponds to curve numbers listed in the summary of laboratory maximum dry density and optimum moisture content test results table for selected fill soil samples encountered during testing and observation. - ROCK CORRECTION For density tests with rock percentage greater than zero, laboratory maximum dry density and optimum moisture content were adjusted for rock content. For tests with rock content equal to zero, laboratory maximum dry density and optimum moisture content values are unadjusted. TYPE OF TEST SC: • Sand Cone Test (ASTM D1556) NU: Nuclear Density Test (ASTM D2922) OT: Other - ELEVATION/DEPTH Test elevations/depths have been rounded to the nearest whole foot. - LOCATION DESCRIPTION (IP): Indicates in-place tests Where (IP) appears in the location description, the compaction procedures were not observed by a representative of Geocon. Tests were taken at the surface or in test pits after placement of the fill. The results of these tests are indicative of the relative compaction at the location of the test only and may not be extrapolated to adjacent areas. Geocon has no opinion regarding the relative compaction of fill in adjacent areas. Project No: 06403-52-32B 0 February 4, 2009 TABLE II SUMMARY OF LABORATORY MAXIMUM DRY DENSITY AND OPTIMUM MOISTURE CONTENT TEST RESULTS ASTM D1557 Sample No. Description Maximum Dry Density (pcf) Optimum Moisture Content (%) 1 Olive brown, Silty SAND 124.2 11.0 2 Brown, Clayey SAND 127.4 10.2 4 I Light yellowish brown, Silty SAND 116.5 13.3 5 Light brown to reddish brown , Silty to Clayey SAND 113.4 15.0 TABLE III SUMMARY OF LABORATORY DIRECT SHEAR TEST RESULTS ASTM D3O8O Sample No. Dr y Density (pet) Moisture Content (°) Unit Cohesion (psf) Angle of Shear Resistance (degrees) Initial Final 1 .110.1. 12.5 I 23.4 270 32 2 114.2 10.4 18.4 225 33 Samples were remolded to approximately 90 percent of laboratory maximumdry density at near optimum moisture content. - - . TABLE IV SUMMARY OF LABORATORY ATTERBERG LIMITS TEST RESULTS ASTM 04318 Sample No. Liquid Limit Plastic Limit Plasticity Index 1. .37 18 19.' 2 . 112 36 18 TABLE - SUMMARY OF LABORATORY PARTICAL SIZE/SIEVE ANALYSIS TEST RESULTS ASTM D 422 Sieve Size Sample No. 1 (% passing) Sample No. 2 (% passing) 1 inch 100 . . 100 3/4 inch 99 98 3/sinch 99 95 No.4 . 99 94 No.8 99 89 No. 30 . 90 . 78 No. 50 84 68 No. 200 34 34 i Project No. 06403-52-32A . February 4, 2009