Loading...
HomeMy WebLinkAboutCT 08-07; LA COSTA TOWN SQUARE OFFICE; FINAL AS GRADED GEOTECHNICAL REPORT; 2015-11-13z w w z z w Corporate I-leaclquarters 6280 Piverdale Street San Diego, CA 92120 P 619.280.4321 T 877.215.4321 F 619.280.4717 W www.scst.com SDVOSB. DVB SB FINAL AS-GRADED GEOTECHNICAL REPORT LA COSTA TOWN SQUARE OFFICE DEVELOPMENT LA COSTA AVENUE CARLSBAD, CALIFORNIA PROJECT NO. C.T. 08-07 PREPARED FOR: MR. JUAN ARRIAGA CONSTRUCTION MANAGER TERRAMAR RETAIL CENTER 5973 AVENIDA ENCINAS, SUITE 300 CARLSBAD, CA 92008 PREPARED BY: SOUTHERN CALIFORNIA SOIL & TESTING, INC. 6280 RIVERDALE STREET SAN DIEGO, CALIFORNIA 92120 Providing Professional Engineering Services Since 1959 0 z w w z 0 z w Corporate Head quarters 6280 Riverdale Street San Diego, CA 92120 P 619.280.4321 1 877.215.4321 I 619.280.4717 W www.scst.com SDVOSB. OVB . SB November 13, 2015 Mr. Juan Arriaga Construction Manager Terramar Retail Center 5973 Avenida Encinas, Suite 300 Carlsbad, California 92008 SCST No. 1211179 Report 70 Subject: FINAL AS-GRADED GEOTECHN lCAL REPORT LA COSTA TOWNE SQUARE - OFFICE DEVELOPMENT LA COSTA AVENUE CARLSBAD, CALIFORNIA TRACT NO. C.T.01-09 References: 1.) "Geotechnical Investigation, La Costa Towne Square Office Development, Carlsbad, California"; prepared by Southern California Soil and Testing, Inc.; dated July 31, 2013 (SCSI 1111198-1 R). 2.) "Interim As-Graded Geotechnical Report, La Costa Towne Square, Commercial I Development, Pads I through 10, 14, 22 and 25, and Office Development, Carlsbad, California"; prepared by Southern California Soil and Testing, Inc.; dated July 31, 2013 (SCSI 1211179-38). I 3.) "Grading Plans, La Costa Town Square Commercial offsite grading (Office) Carlsbad, California"; prepared by O'Day Consultants; dated January 2012. Dear Mr. Arriaga: In accordance with your request, Southern California Soil and Testing, Inc. (SCST) prepared this report to present the results of field observations and tests performed during the grading for the planned subdivision. 1. PROJECT DESCRIPTION AND SUMMARY The project is located north of the intersection of La Costa Avenue and Camino De Las Coches in the City of Carlsbad, California. Mass grading for the project included the construction of a residential subdivision, open space area, commercial retail space and office space. This report presents the earthwork observations and compaction tests performed for office development. In general, the grading operations consisted of the over-excavation of undocumented fill, alluvium and weathered rock beneath and the replacement of this or other processed fill material to reach the planned final pad grade elevations. SCSI performed our services between December 1, 2012 and December 18, 2013. TNT Grading of San Marcos, California performed the grading. TNT Grading provided SCST with spot elevations, as requested, using their in-field GPS mapping system to assist in determining Terramar Retail Centers November 13, 2015 La Costa Towne Square —Office Development SCST No. 1211179-70 Carlsbad, California Page 2 the locations and elevations of our field density tests. Since grading, we visited the site in November I 2015 to observe the field conditions 1.1. PRIMARY EQUIPMENT I The primary equipment used for the site mass grading operations included: John Deere 824 Loader • Water truck Caterpillar D6 Dozer • Caterpillar 350 Excavator Caterpillar D8 Dozer • Caterpillar 651 Scraper . Caterpillar D9 Dozer • Terex 24 Scraper John Deere 800 Excavator 1.2. CLEARING AND GRUBBING ' Site preparation began with the demolition of the existing improvements and the clearing and grubbing of the existing vegetation and organic matter at the proposed development area. The material generated from these operations was exported from the residential site. 1.3. SITE GRADING In general, the grading operations consisted of the over-excavation of undocumented fill, alluvium and weathered rock beneath and the replacement of this or other processed fill material to reach the planned final pad grade elevations. The bottoms of the excavated areas typically exposed Tertiary-age Del Mar Formation or metavolcanic rock. The grading contractor scarified, moisture conditioned, and compacted the surface exposed at the bottom of the excavations. Fill was placed in 6 to 8-inch lifts, moisture conditioned to near optimum moisture content and compacted until field density tests indicated a minimum of 90% relative compaction. Figure 1 presents the approximate locations of these tests. All references to optimum moisture and relative compaction in this report are based on the ASTM D 1557 laboratory test method. Compaction was achieved by means of a John Deere 824 rubber tire loader and other heavy construction equipment. This process continued until planned elevations were reached. Mining excavation occurred at a location on the east end of the site, as shown in Figure 1. Removals from the excavation were transported off site. Rock was used to backfill the excavation area. Two foot minus rock was used to backfill the excavation area up to a depth of approximately 5 feet below finished grade. Six inch minus rock was used for backfill up to a depth of approximately 18-inches below finished grade. Three inch minus rock was used for ' backfill up to finished grade. The fill slope, located along the north side of the retaining wall, was built during the commercial retail space phase of construction as part of field observation and testing services Terramar Retail Centers November 13, 2015 La Costa Towne Square —Office Development SCSTNo. 1211179-70 Carlsbad, California Page 3 SCST provided for the La Costa Commercial project. Reference commercial as-graded report 1 43. 1.4. SUBDRAINS Canyon subdrains were installed at the bottom of removals wherever fill depths exceed 10 feet and where groundwater seepage was observed during grading. Canyon subdrains were constructed using perforated pipe (SDR 35 or equivalent), surrounded by at least 6 cubic feet per lineal foot of crushed rock wrapped in filter fabric (Mirafi 140N or equivalent). Figure 1 presents the locations of the installed canyon subdrains. The locations of the canyon subdrains were surveyed by others. I 2. AS-BUILT GEOLOGY An SCSI geologist observed the geologic conditions exposed during grading. The geologic conditions encountered during grading generally were as anticipated and as presented in the referenced project I geotechnical report. Figures 1 and 2 present approximate geologic contacts.In our professional opinion and to the best of our knowledge, no significantly adverse geologic conditions were observed I and the site appears to be geologically suitable for the proposed construction. 3. SITE IMPROVEMENTS 1 3.1. ANCHOR® WALL BACKFILL The approximate locations for the Anchor® wall backfill tests are listed on Figures 4 through 7. The Anchor® wall backfill in-place density tests have been labeled "WB". The contractor placed manufactured fill material produced by screening and crushing operations on-site for I the wall backfill. The backfill material was compacted in thin lifts until field density tests indicated a minimum of 90% relative compaction. Compaction was achieved primarily by means of a four to six ton riding vibratory roller or hand tamper. The reinforcing grid placement was also observed. Backdrains were placed behind each Anchor® wall. The backdrains consisted of 4-inch 1 diameter perforated pipe (SDR 35) surrounded by a minimum of one cubic feet per lineal foot of crushed rock, which was then wrapped in filter fabric material. As of the date of this report, I and to our knowledge, these subdrains have not been connected to an approved outlet. It is recommended that the outlets for the subdrains be kept free of debris and be allowed to freely I flow at all times. Special inspection requirements verified in accordance with ESR-21 13 or Section 4.3 of the ' California Building Code include: 1. Soil conditions were substantially in conformance with those described in the referenced project geotechnical investigation report. " z II1• z I Terramar Retail Centers November 13, 2015 La Costa Towne Square —Office Development SCSTNo. 1211179-70 Carlsbad, California Page 4 The base of the Anchor® wall was founded in a layer of crushed rock that, in turn, was founded in compacted fill or formational materials. In our opinion, these soils are suitable for the support of the proposed wall. The Anchor® wall, including geogrid type, length and placement, was constructed substantially in accordance with the plans. The angle of the face of the wall was in substantial conformance with the wall section on the applicable plans. The Anchor® wall was constructed with a backdrain at the base of the wall, immediately behind the block. The backdrains were surrounded by a minimum of one cubic foot of 3h-inch crushed rock per linear foot. The rock was wrapped with filter fabric. The backdrain outlets should be connected to storm drains or outlets onto paved areas, in a timely manner. These outlets should be kept free of debris and be allowed to freely flow at all times. The outlets have not been tied in to date. We observed the construction of the Anchor® wall under our purview, and performed laboratory and field in-situ density /moisture content testing. The results of our tests and observations are the basis for our opinion that the wall was constructed in substantial conformance with geotechnical recommendations, the City of Carlsbad Special Inspection Ordinances concerning Anchor® walls and the California Building Code. 4. FIELD OBSERVATIONS AND LABORATORY TESTS A representative of SCST performed periodic field observations and density tests during the grading operations at the locations shown on Figure 1. The density tests were performed according to ASTM I D 6938 (nuclear gauge) procedures. The results of these tests are shown on Figures 3 through 7. The accuracy of the in-situ density test locations and elevations is a function of the accuracy of the survey control provided by others than SCST representatives. Unless otherwise noted, their locations and I elevations were determined by pacing and hand level methods and should be considered accurate only to the degree implied by the method used. I As used herein, the term "observation" implies only that we observed the progress of work we were involved with, and performed field density tests which, in conjunction with our observations, were the I base for our opinion as to whether the work was performed in substantial conformance with the geotechnical recommendations and the requirements of the applicable agencies. Maximum dry density determinations were performed on representative samples of the soils used in the compacted fills according to ASTM D 1557. The results of these tests, presented on Figure 8, were used in conjunction with the field density tests to determine the degree of relative compaction of the compacted fill. Rock corrections were applied to the soil samples having not more than 40 percent by weight retained on the #4 sieve or not more than 30 percent by weight retained on the %-inch sieve according to Terramar Retail Centers November 13, 2015 La Costa Towne Square —Office Development SCST No. 1211179-70 Carlsbad, California Page 5 ASTM D 4718. The results of these tests, as presented on Figure 8, were used in conjunction with the field density tests to determine the degree of relative compaction of the compacted fill. 5. REMAINING WORK The following operations remain to be completed. It is recommended that field observations and relative compaction tests be performed during these operations to verify that these operations are being performed in accordance with job requirements and local grading ordinances. . Connection of all wall subd rains to approved outlets The grading contractor sheet graded the pad to the planned final pad grade elevation. We anticipate additional grading will be required once final development plans are available. The main geotechnical consideration existing at the site consists of: . A cut/fill transition across the site Highly expansive soil Hard rock that can require blasting or specialized rock breaking techniques to excavate SCSI should be contacted to provide specific geotechnical recommendations once the final development plans are available. CONCLUSIONS Based on our field observations and the in-place density test results, it is the opinion of SCSI that the geotechnical engineering and engineering geology aspects of the grading are in compliance with the approved referenced geotechnical report, the City of Carlsbad Grading Ordinance, and the Grading/Improvement Plan Drawing for Project Number C.T. 08-07. Minimum recommendations for the design of the foundations, as presented in the referenced report(s), remain applicable. LIMITATIONS This report covers only the services performed between December 1, 2012 and December 18, 2013. Our opinions are based on our observations and the relative compaction test results and are limited by the scope of the work that we agreed to perform. Our work was performed in accordance with the currently accepted standard of practice and in such a manner as to provide a reasonable measure of the compliance of the grading and backfill operations with the project requirements. No warranty, express or implied, is made or intended with respect to the work that we have performed, and neither the performance of this work nor the submittal of this report should be construed as relieving the contractor of its responsibility to conform with the project requirements. Terramar Retail Centers November 13, 2015 La Costa Towne Square —Office Development SCSTNo. 1211179-70 Carlsbad, California Page 6 Our work was generally performed on an "on-call" basis. Therefore, the in-place density tests performed by our field representative can only be construed as representative of the areas tested as shown on the attached figures. I If you have any questions regarding this document, please contact us at 619-280-4321. Respectfully Submitted, SOUTHERN CALIFORNIA AND TESTING, INC. 0ESSi0 E1 NO. 2767 N0.2472 ENGINEERING EotOGIST N. Emil Rudolp ,GE 276 'Ct' Douglas iKinner, CEG F CP Principal Engineer Senior Engineering Geologist TH:ER:DAS Attachments: Figures 1 and 2 - In-Place Density Test Location Map Figures 3 through 7 - Field Density and Laboratory Compaction Test Results Figure 8 - Maximum Density Determinations (1) Addressee via e-mail: Juan.Arriagapdcenters.com 0 z w CJ w _J � (f) 0 (f) 188) 0� -4�U! ( :alB:JS 6Liii1:i :·oN qor mr :ils sio1: ·,aqwaAON :a1uo 'E Q) E 0. 0 1 0 � !E Q. Ol C u�(.') 0 "' E :.:J Q) .; E -�0. 0. <( j\ ,-, I I I I I I / I ( J ( J, __ , , __ , B!UJOJ!IB:) 'peqsµe:) 8Nl□lln8 381��0 SNOl1V8011S31 A.l.lSN30 38Vld-NI >lt!OMH1W3 3t!Vnos NMOl V!S08 Vl \ \ \ \ \ \ \ ... , ' \ \ \\ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ '8NI '8Nl1S31 '11710S VIN!:10::lllV:J N!:13Hln0S JOB NAME: La Costa Square Office Site JOB NUMBER: 1211179 IN-PLACE DENSITY TESTS I TEST ELEVATION MOISTURE DRY DENSITY SOIL REL.COMP. NO. DATE LOCATION (feet,MSL) (percent) (p.c.f.) TYPE (percent) 32 1/15/13 East side of Office site 254.0 19.9 108.6 3 91.1 33 1/15/13 East side of Office site 256.0 18.0 108.5 3 91.0 44 1/17/13 Commercial South Building 14 260.0 13.8 110.1 3 92.4 49 1/17/13 Commercial South Building 14 267.5 12.5 112.9 3 94.7 50 1/17/13 Commercial South Building 14 272.0 18.8 100.6 3 84.4 51 1/17/13 RETEST OF 50 272.0 14.0 108.2 3 90.8 52 1/18/13 Off-Site South Lot #2 260.0 19.7 109.7 3 92.0 53 1/18/13 Off-Site South Lot #2 261.5 18.0 108.9 3 91.4 54 1/18/13 Commercial South Building 14 274.0 19.2 104.7 3 87.8 55 1/18/13 RETEST OF 54 274.0 18.0 108.0 3 90.6 159 2/7/13 South of lot #2 office site 263.5 11.0 99.4 2 93.5 162 2/7/13 South of lot #2 office site 267.0 16.3 104.1 4 92.1 177 2/12/13 S. of lot#2 office site 266.0 13.3 103.2 12 94.4 178 2/12/13 S. of lot#2 office site 267.0 16.4 97.2 12 88.9 180 2/12/13 RETEST#178 267.0 14.0 99.3 12 90.9 181 2/13/13 S. of lot#2 office 269.5 18.5 103.8 12 95.0 186 2/13/13 S. lot#2 office 274.0 14.8 105.0 6 92.3 187 2/13/13 S. lot#2 office 272.0 14.5 102.3 12 93.6 192 2/14/13 South lot Office 276.0 18.0 103.3 6 90.9 205 2/15113 S. of Lot 2 Office 277.5 16.8 98.9 2 93.0 217 2/19/13 S. of Lot 2 Office 279.0 14.8 106.2 6 93.4 223 2/20/13 S. of Lot 2 Office 276.0 13.0 105.8 6 93.1 224 2/20/13 S. of Lot Office 278.0 18.3 103.8 6 91.3 229 2/20/13 S. of Lot Office 280.0 13.6 111.9 8 90.4 230 2/21/13 S. of 10t2 office 279.0 14.5 102.5 6 90.1 231 2/21/13 S. of Lot Office 268.0 19.4 99.4 2 93.5 232 2/21/13 S. of Lot 2 Office 271.0 20.0 101.0 2 95.0 236 2/21/13 S. of Lot 2Office 274.0 19.4 96.8 2 91.1 237 2/21/13 S. of Lot 2Office 276.0 18.3 97.1 2 91.3 242 2/22/13 S. of Lot 2 Office 282.5 20.0 99.9 2 94.0 341 3/7/13 5 of lot 2 office 284.0 13.0 100.0 2 94.1 345 3/7/13 S of lot 2 office 287.0 13.8 97.2 2 91.4 346 3/7/13 S of lot 2 office 289.0 14.4 98.4 2 92.6 415 3/21/13 5 of lot 2 office 293.0 18.8 103.7 4 91.8 781 6/17/13 5 of Lot Office 291.0 15.8 101.4 16 92.4 782 6/17/13 S of Lot Office 293.5 16.1 99.9 16 91.1 786 6/18/13 S of Lot 2 slope test Office 282.0 16.2 101.8 16 92.8 787 6/19/13 Sof Lot i Office 276.5 21.2 102.0 16 93.0 790 6/19/13 5 of Lot Office 279.0 12.5 105.0 1 92.7 807 6/26/13 Slope test S of Lot 2 Office 278.0 16.0 100.7 16 91.8 808 6/26/13 Slope test S of Lot 2 Office 282.0 11.9 104.1 1 91.9 810 6/26/13 S of Lot 1 Office 281.0 8.6 109.4 3 91.8 TURN OVER DATE BETWEEN TPC AND WHITING TURNER #N/A 848 7/11/13 S.W. Corner Office site 278.0 11.2 119.6 17b 92.0 849 7/11/13 SW. Corner Office site 280.0 10.8 121.4 17b 93.4 850 7/11/13 S.W. Corner Office site 283.0 12.1 120.1 17b 92.4 851 7/12/13 SW. Corner Office site 285.0 11.2 119.7 17b 92.1 852 7/12/13 S.W. Corner Office site 287.0 12.1 123.4 17b 94.9 853 7/12/13 S.W. Corner Office site 289.0 10.6 121.3 17b 93.3 903 7/31/13 E of Lot 2 Office 388.5 12.2 111.5 9 87.1 904 7/31/13 RETEST 903 Office 388.5 15.3 117.7 9 92.0 905 7/31/13 E of Lot 2 Office 390.5 12.6 112.1 7 92.0 906 7/31/13 E of Lot 1 Office 377,5 15.3 90.2 16 82.2 907 7/31/13 RETEST 906 Office 377.5 23.3 99.2 16 90.4 908 7/31/13 E of Lot 1 Office 378.5 24.0 100.6 16 91.7 909 7/31/13 E of Lot 1 Office 377.0 23.0 100.3 16 91.4 916 8/2/13 east of lot 1 office 280.0 21.5 98.4 16 89.7 917 8/2/13 Re-Test 916 280.0 22.1 99.3 16 90.5 918 8/2/13 east of lot 1 office 282.0 7.2 127.9 22d 92.3 962 8/16/13 Lot Office 287.0 11.8 130.4 22c 95.0 1056a 9/16/13 E side Office site 384.0 10.7 126.8 22b 93.4 1057 9/16/13 E side Office site 386.0 8.9 124.1 22b 91.4 1058 9/16/13 E side Office site 386.0 9.5 122.6 22b 90.3 1059 9/16/13 E side Office site 385.0 11.4 125.2 22b 92.2 1060 9/16/13 E side Office site 387.0 12.1 122.9 22b 90.5 1065 9/17/13 E side Office site 388.0 7.6 127.4 22b 93.8 FIGURE 3 JOB NAME: La Costa Square Office Site JOB NUMBER: 1211179 IN-PLACE DENSITY TESTS TEST ELEVATION MOISTURE DRY DENSITY SOIL REL.COMP. NO. DATE LOCATION (feet,MSL) (percent) (p.c.f.) TYPE (percent) 1066 9/17/13 E side Office site 386.0 8.3 129.3 22b 95.2 1067 9/17/13 E side Office site 390.0 11.1 126.4 22b 93.1 1068 9/17/13 E side Office site 390.0 10.3 123.9 22b 91.2 1069 9/17/13 E side Office site 392.0 10.5 122.6 22b 90.3 1070 9/17/13 E side Office sit e 392.0 9.7 124.8 22b 91.9 1071 9/18/13 E side Office site 294.0 10.3 126.7 22b 93.3 1072 9/18/13 E side Office site 293.5 11.7 124.9 22b 92.0 1073 9/18/13 Wside Office site 289.0 8.5 123.5 22b 90.9 1074 9/18/13 Wside Office site . 289.0 7.8 122.9 22b 90.5 1075 9/18/13 Wside Office site 291.0 12.1 126.1 22b 92.9 1076 9/18/13 W side Office site 291.0 11.9 127.3 22b 93.7 1077 9/18/13 W side Office site 291.0 11.5 125.5 22b 92.4 1084 9/19/13 W side Office site 292.0 11.2 122.5 15 92.3 1085 9/19/13 W side Office site 293.0 8.7 120.3 15 90.7 1086 9/20/13 Wside Office site 294.0 9.6 120.9 15 91.1 9/23/13 Wside Office site 292.5 11.2 124.0 15 93.4 P 1091 1117 10/1/13 Slope Wend of 01 Wall Office 296.0 12.8 120.3 17d 90.8 1118 10/1/13 Slope Wend of 01 Wall Office 298.0 10.6 119.8 17d 90.4 1119 10/1/13 Slope Wend of 01 Wall Office 300.0 11.0 120.9 17d 91.2 Anchor Wall WB122 4/4/13 Anchor Wall 1 Office Sta 3+50 291.3 9.7 122.5 20 92.9 WB123 4/4/13 Anchor Wall 1 Office Sta 5+75 293.3 10.6 120.8 20 91.6 WB124 4/4/13 Anchor Wall 1 Office Sta 7+20 295.3 10.0 121.1 20 91.8 WB138 4/12/13 Anchor Wall 1 Office Sta 2+50 294.0 9.5 120.2 20 91.1 W8139 4/12/13 Anchor Wall 1 Office Sta 3+00 294.0 10.3 121.3 20 92.0 WB140 4/12/13 Anchor Wall 1 Office Sta 3+50 294.0 11.1 122.5 20 92.9 WB141 4/12/13 Anchor Wall 1 Office Sta 4+00 294.0 11.0 120.8 20 91.6 WB142 4/12/13 AnchorWall 1 Office Sta 4+50 294.0 10.4 118.9 20 90.1 WB143 4/12/13 Anchor Wall 1 Office Sta 5+00 294.0 9.7 119.4 20 90.5 WB144 4/12/13 Anchor Wall 1 Office Sta 5+50 294.0 8.1 125.3 20 95.0 WB173 4/22/13 Anchor Wall 1 Office Sta 4+30 295.3 8.8 120.7 20 91.5 WB174 4/22/13 Anchor Wall 1 Office Sta 5+00 295.3 9.4 119.5 20 90.6 WB175 4/22/13 Anchor Wall 1 Office Sta 5+65 295,3 9.2 123.1 20 93.3 W6176 4/22/13 Anchor Wall 1 Office Sta 6+25 295.3 10.3 121.7 20 92.3 WB179 4/22/13 Anchor Wall 1 Office Sta 2+40 Anchor Wall 1 Office Sta 2+90 295.3 8.6 124.0 20 94.0 WB180 4/22/13 295.3 9.7 120.8 20 91.6 WB181 4/22/13 Anchor Wall 1 Office Sta 3+40 295.3 11.0 121.0 20 91.7 WB182 4/23/13 Anchor Wall 1 Office Sta 7+75 296.7 9.2 124.8 20 94.6 WB183 4/23/13 Anchor Wall 1 Office Sta 7+25 296.7 9.6 122.1 20 92.6 WB184 4/23/13 Anchor Wall 1 Office Sta 6+75 296.7 7.9 120.0 20 91.0 WB185 4/24/13 Anchor Wall 1 Office Sta 6+25 296.7 8.9 118.2 18 93.1 WB186 4/24/13 Anchor Wall 1 Office Sta 5+75 296.7 11.0 117.3 18 92.4 WB187 4/24/13 Anchor Wall 1 Office Sta 5+25 296.7 11.6 115.8 18 91.2 WB188 P 4/24/13 Anchor Wall 1 Office Sta 4+75 296.7 10,4 120.4 18 94.8 WB189 4/24/13 Anchor Wall 1 Office Sta 4+25 296.7 10.9 117.9 18 92.8 WB190 4/24/13 Anchor Wall 1 Office Sta 3+75 296.7 9.5 115.8 18 91.2 WB191 4/24/13 Anchor Wall 1 Office Sta 3+25 296.7 9.1 116.9 18 92.0 4/24/13 Anchor Wall 1 Office Sta 2+75 296.7 9.9 115.2 18 90.7 WB192 WB193 4/25/13 Anchor Wall 1 Office Sta 6+50 298.0 9.6 115.8 18 91.2 WB194 4/25/13 Anchor Wall 1 Office Sta 6+00 298.0 9.0 117.3 18 92.4 WB195 4/25/13 Anchor Wall 1 Office Sta 5+50 298.0 10.2 114.9 18 90.5 4/25/13 Anchor Wall 1 Office Sta 5+00 298.0 9.9 114.6 18 90.2 WB196 WB197 4/25/13 Anchor Wall 1 Office Sta 4+50 298.0 8.7 115.6 18 91.0 WB198 4/25/13 Anchor Wall 1 Office Sta 4+00 298.0 8.2 119.3 18 93.9 WB199 4/25/13 Anchor Wall 1 Office Sta 3+50 298.0 10.8 117.4 18 92.4 WB200 4/25/13 Anchor Wall 1 Office Sta 3+00 298.0 10.4 115.9 18 91.3 WB201 P 4/26/13 Anchor Wall 1 Office Sta 7+00 298.0 8.7 121.1 18 95.4 WB202 4/26/13 Anchor Wall 1 Office Sta 7+50 298.0 9.3 118.9 18 93.6 WB203 4/26/13 Anchor Wall 1 Office Sta 7+75 300.0 9.1 120.4 18 94.8 WB204 4/26/13 Anchor Wall 1 Office Sta 7+25 300.0 10.4 116.3 18 91.6 WB205 4/26/13 Anchor Wall 1 Office Sta 6+75 300.0 8.9 115.8 18 91.2 WB206 4/26/13 Anchor Wall 1 Office Sta 6+25 300.0 8.5 114.6 18 90.2 WB207 4/26/13 Anchor Wall 1 Office Sta 5+75 300.0 12.0 117.4 18 92.4 WB208 4/26/13 Anchor Wall 1 Office Sta 5+25 300.0 11.4 115.9 18 91.3 FIGURE 4 JOB NAME: La Costa Square Office Site JOB NUMBER: 1211179 IN-PLACE DENSITY TESTS I TEST ELEVATION MOISTURE DRY DENSITY SOIL REL.COMP. NO. DATE LOCATION (feet,MSL) (percent) (p.c.f.) TYPE (percent) WB209 4/26/13 Anchor Wall 1 Office Sta 4+75 300.0 10.2 118.9 18 93.6 WB210 4/29/13 Anchor Wall 1 Office Sta 4+25 300.0 12.0 118.2 18 93.1 WB211 4/29/13 Anchor Wall 1 Office Sta 3+75 300.0 12.4 116.6 18 91.8 WB212 4/29/13 Anchor Wall 1 Office Sta 3+15 302.0 11.6 115.9 18 91.3 WB213 4/29/13 Anchor Wall 1 Office Sta 3+65 302.0 11.2 120.4 18 94.8 WB214 4/29/13 Anchor Wall 1 Office Sta 4+15 302.0 9.7 118.4 18 93.2 W6215 4/29/13 Anchor Wall 1 Office Sta 4+65 302.0 10.4 121.9 18 96.0 WB216 4/29/13 Anchor Wall 1 Office Ste 5+15 302.0 10.1 117.3 18 92.4 WB217 4/29/13 Anchor Wall 1 Office Sta 5+65 302.0 11.8 115.5 18 90.9 WB218 4/30/13 Anchor Wall 1 Office Sta 6+15 302.0 11.2 114.9 18 90.5 WB219 4/30/13 Anchor Wall 1 Office Sta 6+65 302.0 12.4 116.2 18 91.5 WB220 4/30/13 Anchor Wall 1 Office Sta 7+15 302.0 10.5 117.1 18 92.2 WB221 4/30/13 Anchor Wall 1 Office Ste 7+65 302.0 8.1 120.4 18 94.8 WB222 4/30/13 Anchor Wall 1 Office Sta 3+00 304.0 7.7 122.6 15 92.4 WB223 4/30/13 Anchor Wall 1 Office Sta 3+50 304.0 8.9 121.4 15 91.5 W6224 4/30/13 Anchor Wall 1 Office Sta 4+00 304.0 6.8 119.9 15 90.4 WB225 5/1/13 Anchor Wall 1 Office Sta 4+50 304.0 7.9 120.2 19 90.5 WB226 5/1/13 Anchor Wall 1 Office Sta 5+00 304.0 8.8 124.7 19 93.9 WB227 5/1/13 Anchor Wall 1 Office Sta 5+50 304.0 8.4 123.9 19 93.3 WB228 5/1/13 Anchor Wall 1 Office Sta 6+00 304.0 7.3 120.6 19 90.8 WB229 5/1/13 Anchor Wall 1 Office Sta 6+50 304.0 9.3 122.4 19 92.2 W6230 5/1/13 Anchor Wall 1 Office Sta 7+00 304.0 9.0 125.1 19 94.2 WB231 5/1/13 Anchor Wall 1 Office Sta 7+50 304.0 7.8 124.5 19 93.8 WB232 5/2/13 Anchor Wall 1 Office Sta 3+25 306.0 8.5 125.3 19 94.4 WB233 5/2/13 Anchor Wall 1 Office Sta 3+75 306.0 8.9 120.3 19 90.6 WB234 5/2/13 Anchor Wall 1 Office Sta 4+25 306.0 9.4 122.0 19 91.9 WB235 5/2/13 Anchor Wall I Office Sta 4+75 306.0 9.0 124.9 19 94.1 W6236 5/2/13 Anchor Wall 1 Office Sta 5+25 306.0 9.6 121.6 19 91.6 WB237 5/2/13 Anchor Wall 1 Office Sta 5+75 306.0 9.9 120.4 19 90.7 WB238 5/2/13 Anchor Wall 1 Office Sta 6+25 306.0 7.8 126.1 19 95.0 WB239 5/2/13 Anchor Wall 1 Office Sta 6+75 306.0 8.4 119.9 19 90.3 WB240 5/3/13 Anchor Wall 1 Office Sta 7+25 306.0 9.7 119.5 19 90.0 WB241 5/3/13 Anchor Wall 1 Office Sta 3+35 308.0 9.3 121.5 19 91.5 WB242 5/3/13 Anchor Wall 1 Office Sta 3+85 308.0 10.3 120.6 19 90.8 W8243 5/3/13 Anchor Wall 1 Office Sta 4+35 308.0 10.1 121.4 19 91.4 WB244 5/3/13 Anchor Wall 1 Office Sta 4+85 308.0 8.7 120.3 19 90.6 WB245 5/3/13 Anchor Wall 1 Office Sta 5+35 308.0 9.3 125.9 19 94.8 WB246 5/3/13 Anchor Wall 1 Office Sta 5+85 308.0 9.6 124.4 19 93.7 WB247 5/3/13 Anchor Wall 1 Office Sta 6+35 308.0 11.4 123.2 19 92.8 WB248 5/3/13 Anchor Wall 1 Office Sta 6+85 308.0 10.8 119.8 19 90.2 WB249 5/3/13 Anchor Wall 1 Office Sta 7+15 308.0 7.8 120.8 19 91.0 WB250 5/8/13 Anchor Wall 1 Office Sta 8+15 298.0 7.8 125.7 19 94.7 WB251 5/8/13 Anchor Wall 1 Office Sta 8+65 298.0 9.5 123.1 19 92.7 WB252 5/8/13 Anchor Wall 1 Office Sta 9+10 298.0 11.7 119.7 19 90.1 WB253 5/8/13 Anchor Wall 1 Office Sta 8+25 300.0 8.8 126.0 19 94.9 WB254 5/8/13 Anchor Wall 1 Office Sta 8+75 300.0 10.2 124.4 19 93.7 WB255 5/8/13 Anchor Wall 1 Office Sta 9+20 300.0 10.0 121.9 19 91.8 WB256 5/9/13 Anchor Wall 1 Office Sta 8+00 302.0 12.6 122.3 19 92.1 WB257 5/9/13 Anchor Wall 1 Office Sta 8+50 302.0 11.3 126.3 19 95.1 WB258 5/9/13 Anchor Wall 1 Office Sta 9+00 302.0 10.5 123.9 19 93.3 WB259 5/9/13 Anchor Wall 1 Office Sta 8+05 304.0 11.2 120.8 19 91.0 WB260 5/9/13 Anchor Wall 1 Office Sta 8+55 304.0 9.8 119.8 19 90.2 WB261 5/9/13 Anchor Wall 1 Office Sta 9+05 304.0 8.7 120.3 19 90.6 WB262 5/10/13 Anchor Wall 1 Office Sta 8+00 306.0 8.6 123.3 19 92.8 WB263 5/10/13 Anchor Wall 1 Office Sta 8+50 306.0 9.7 121.6 19 91.6 WB264 5/10/13 Anchor Wall 1 Office Ste 9+00 306.0 9.8 121.0 19 91.1 WB265 5/10/13 Anchor Wall 1 Office Sta 9+30 306.0 9.3 126.2 19 95.0 WB266 5/10/13 Anchor Wall 1 Office Sta 9+40 308.0 11.4 119.9 19 90.3 WB267 5/10/13 Anchor Wall 1 Office Sta 8+90 308.0 10.2 124.1 19 93.4 WB268 5/10/13 Anchor Wall 1 Office Sta 8+40 308.0 5.8 115.4 19 86.9 WB269 5/10/13 RETEST#WB268 308.0 7.5 119.5 19 90.0 WB270 5/10/13 Anchor Wall 1 Office Sta 7+90 308.0 8.1 119.7 19 90.1 WB271 5/13/13 Anchor Wall 1 Office Ste 3+00 310.0 8.6 122.7 19 92.4 WB272 5/13/13 Anchor Wall 1 Office Sta 3+50 310.0 8.3 121.0 19 91.1 WB273 5/13/13 Anchor Wall 1 Office Sta 4+00 310.0 9.5 123.8 19 93.2 WB274 5/13/13 Anchor Wall 1 Office Ste 4+50 310.0 9.9 119.9 19 90.3 FIGURE 5 JOB NAME: La Costa Square Office Site JOB NUMBER: 1211179 IN-PLACE DENSITY TESTS TEST ELEVATION MOISTURE DRY DENSITY SOIL REL.COMP. NO. DATE LOCATION (feet,MSL) (percent) (p.c.f.) TYPE (percent) WB275 5/13113 Anchor Wall 1 Office Sta 5+00 310.0 9.8 120.4 19 90.7 WB276 5/13/13 Anchor Wall 1 Office Sta 5+50 310.0 10.3 120.9 19 91.0 WB277 5/13/13 Anchor Wall 1 Office Sta 6+00 310.0 8.9 122.6 19 92.3 WB278 5/13/13 Anchor Wall 1 Office Sta 6+50 310.0 9.4 119.8 19 90.2 WB279 5/13/13 Anchor Wall 1 Office Sta 7+00 310.0 9.7 123.5 19 93.0 WB280 5/14/13 Anchor Wall 1 Office Sta 3+20 311.0 11.3 118.4 18 93.2 WB281 5/14/13 Anchor Wall 1 Office Sta 3+60 311.0 11.9 115.9 18 91.3 WB282 5/14/13 Anchor Wall 1 Office Sta 4+10 311.0 10.4 117.4 18 92.4 WB283 5/14/13 Anchor Wall I Office Sta 4+60 312.0 10.6 121.3 18 95.5 WB284 5/14/13 Anchor Wall 1 Office Sta 5+10 312.0 10.0 119.5 18 94.1 W6285 5/14/13 Anchor Wall 1 Office Sta 5+60 312.0 9.8 117.5 18 92.5 WB286 5/14/13 Anchor Wall 1 Office Sta 6+10 312.0 12.4 117.8 18 92.8 WB287 5/14/13 Anchor Wall 1 Office Sta 6+60 312.0 11.1 114.9 18 90.5 WB288 5/14/13 Anchor Wall 1 Office Sta 7+10 312.0 10.7 116.7 18 91.9 WB424 6/21/13 Anchor Wall 1 Office Sta 9+00 310.0 7.3 123.8 20 93.9 WB425 6/21/13 Anchor Wall 1 Office Sta 8+50 310.0 7.1 125.6 20 95.2 WB426 6/21/13 Anchor Wall 1 Office Sta 8+00 310.0 8.6 120.4 20 91.3 WB427 6/21/13 Anchor Wall 1 Office Ste 7+50 310.0 8.0 121.6 20 92.2 WB428 6/21/13 Anchor Wall 1 Office Sta 9+25 312.0 8.4 120.9 20 91.7 WB429 6/21/13 Anchor Wall 1 Office Sta 8+75 312.0 7.4 119.9 20 90.9 WB430 6/21/13 Anchor Wall 1 Office Sta 8+25 312.0 7.2 122.2 20 92.6 WB431 6/21/13 Anchor Wall 1 Office Sta 7+75 312.0 7.0 123.8 20 93.9 WB432 6/21/13 Anchor Wall 1 Office Sta 7+25 312.0 6.7 124.4 20 94.3 WB433 6/25/13 Anchor Wall 1 Office Sta 9+30 314.0 5.0 121.4 20 92.0 WB434 6/25/13 Anchor Wall 1 Office Sta 8+80 314.0 5.3 119.8 20 90.8 WB435 6/25/13 Anchor Wall 1 Office Sta 8+30 314.0 5.9 119.5 20 90.6 W6436 6/25/13 Anchor Wall 1 Office Sta 7+80 314.0 5.9 122.1 20 92.6 WB437 6/25/13 Anchor Wall 1 Office Sta 7+30 314.0 4.6 127.0 20 96.3 TURN OVER DATE BETWEEN TPC AND WHITING TURNER WB463 7/1/13 Anchor Wall 1 Office Sta 9+60 316.0 6.5 120.8 20 91.6 WB464 7/1/13 Anchor Wall 1 Office Sta 9+10 316.0 6.0 119.9 20 90.9 WB465 7/1/13 Anchor Wall 1 Office Sta 8+60 316.0 5.8 121.4 20 92.0 WB466 7/1/13 Anchor Wall 1 Office Sta 8+10 316.0 5.4 119.4 20 90.5 WB467 7/1/13 Anchor Wall 1 Office Sta 7+60 316.0 5.9 121.0 20 91.7 WB468 7/1/13 Anchor Wall 1 Office Sta 7+20 316.0 6.2 119.6 20 90.7 WB483 7/2/13 Anchor wall 1 Office Sta 9+50 318.0 8.4 118.9 20 90.1 WB484 7/2/13 Anchor wall 1 Office Sta 9+00 318.0 6.7 123.5 20 93.6 W8485 7/2/13 Anchor wall 1 Office Sta 8+60 318.0 6.5 122.9 20 93.2 WB486 7/2/13 Anchor wall 1 Office Sta 8+10 318.0 8.2 121.4 20 92.0 WB487 7/3/13 Anchor wall 1 Office Sta 9+60 320.0 7.8 122.4 20 92.8 WB488 7/3/13 Anchor wall 1 Office Sta 9+10 320.0 7.9 125.8 20 95.4 WB606 8/8/13 Anchor Wall 1 Office Sta 1+35 294.0 9.0 124.6 20 94.5 WB607 8/8/13 Anchor Wall 1 Office Sta 1+85 294.0 8.6 119.9 20 90.9 WB608 8/8/13 Anchor Wall 1 Office Ste 2+25 294.0 8.4 122.7 20 93.0 WB609 8/8/13 Anchor Wall 15 Comm Sta 3+30 320.8 7.6 126.2 20 95.7 WB610 8/8/13 Anchor Wall 15 Comm Sta 3+80 321.4 9.4 123.9 20 93.9 WB611 8/8/13 Anchor Wall 15 Comm Sta 4+20 323.4 8.8 120.2 20 91.1 WB612 8/9/13 Anchor Wall 1 Office Sta 1+45 296.0 7.3 122.2 20 92.6 WB613 8/9/13 Anchor Wall 1 Office Sta 1+80 296.0 7.2 125.8 20 95.4 WB614 8/9/13 Anchor Wall 1 Office Sta 2+30 296.0 8.3 122.5 20 92.9 WB615 8/12/13 Anchor Wall I Office Sta 1+25 298.0 9.2 125.2 20 94.9 WB616 8/12/13 Anchor Wall 1 Office Sta 1+75 298.0 7.8 123.6 20 93.7 W6617 8/12/13 Anchor Wall 1 Office Sta 2+25 298.0 8.3 122.9 20 93.2 WB618 8/13/13 Anchor Wall 1 Office Sta 1+15 300.0 6.2 126.4 20 95.8 WB619 8/13/13 Anchor Wall 1 Office Sta 1+65 300.0 7.5 122.9 20 93.2 WB620 8/13/13 Anchor Wall 1 Office Sta 2+15 300.0 6.4 125.2 20 94.9 WB621 8/13/13 Anchor Wall 1 Office Sta 2+55 300.0 5.9 120.4 20 . 91.3 WB622 8/14/13 Anchor Wall 1 Office Sta 1+10 302.0 6.9 120.6 20 91.4 WB623 8/14/13 Anchor Wall 1 Office Sta 1+60 302.0 7.1 119.8 20 90.8 FIGURE 6 JOB NAME: La Costa Square Office Site JOB NUMBER: 1211179 IN-PLACE DENSITY TESTS TEST ELEVATION MOISTURE DRY DENSITY SOIL REL.COMP. NO. DATE LOCATION (feet,MSL) (percent) (p.c.f.) TYPE (percent) WB624 8/14/13 Anchor Wall 1 Office Sta 2+10 302.0 9.8 124.1 20 94.1 WB625 8114/13 Anchor Wall 1 Office Sta 2+60 302.0 8.3 121.7 20 92.3 WB626 8/15/13 Anchor Wall 1 Office Sta 1+30 304.0 8.7 120.7 20 91.5 8/15/13 Anchor Wall 1 Office Sta 1+80 304.0 8.9 124.7 20 94.5 WB627 WB628 8/15/13 Anchor Wall 1 Office Sta 2+30 304.0 9.9 122.4 20 92.8 W8629 8/15/13 Anchor Wall 1 Office Sta 2+80 304.0 7.6 123.3 20 93.5 WB630 8/16/13 Anchor Wall 1 Office Sta 1+05 306.0 7.6 126.3 20 95.8 WB631 8/16/13 Anchor Wall 1 Office Sta 1+55 306.0 8.9 123.8 20 93.9 WB632 8/16/13 Anchor Wall 1 Office Sta 2+05 306.0 8.4 122.1 20 92.6 WB633 8/16/13 Anchor Wall 1 Office Sta 2+55 306.0 8.2 125.4 20 95.1 WB634 6/16/13 Anchor Wall 1 Office Sta 2+95 306.0 9.1 119.9 20 90.9 WB635 8/19/13 Anchor Wall 1 Office Sta 1+40 307.0 7.8 123.6 20 93.7 WB636 8/19/13 Anchor Wall 1 Office Sta 1+90 308.0 9.5 125.7 20 95.3 WB637 8/19/13 Anchor Wall 1 Office Sta 2+40 308.0 9.1 120.6 20 91.4 WB638 8/19/13 Anchor Wall 1 Office Sta 2+90 308.0 9.0 120.1 20 91.1 WB639 8/19/13 Anchor Wall 1 Office Sta 3+15 308.0 8.3 122.8 20 93.1 WB640 8/20/13 Anchor Wall 1 Office Sta 2+45 310.0 8.4 119.7 20 90.8 WB641 8/20/13 Anchor Wall 1 Office Sta 2+95 310.0 9.1 123.5 20 93.6 WB642 8/20/13 Anchor Wall 1 Office Sta 3+25 310.7 7.9 120.8 20 91.6 Storm Drain SD117 4/9/13 SD Sheet 3 Office 286.0 12.1 102.1 2 96.0 SD1I8 4/9/13 SD Sheet 3 Office 288.0 11.8 100.7 2 94.7 SD119 4/10/13 SD Sheet 3 Office 286.0 14.2 99.3 2 93.4 S0120 4/10/13 SD Sheet 3 Office 288.0 15.1 101.2 2 95.2 SD121 4/10/13 SD Sheet 3 Office 290.0 13.9 100.1 2 94.2 5D122 4/10/13 SD Sheet 3 Office 290.0 12.8 101.1 2 95.1 SD134 4/12/13 Storm Drain Sheet 3 Office 283.0 18.8 102.5 12 93.8 4/12/13 Storm Drain Sheet 3 Office 285.0 18.0 101.2 12 92.6 SD135 SD136 4/12/13 Storm Drain Sheet 3 Office 287.0 18.5 101.8 12 93.1 S0157 4/18/13 Storm Drain Sheet 3 Office 285.0 12.7 100.1 2 94.2 5D158 4/18/13 Storm Drain Sheet 3 Office 287.0 13.0 101.7 2 95.7 5D159 4/18/13 Storm Drain Sheet 3 Office 284.0 19.6 100.0 2 94.1 SD160 4/18/13 Storm Drain Sheet 3 Office 286.0 19.3 99.7 2 93.8 SID 18O 4/23/13 Storm Drain Sheet 3 Office 282.0 15.2 102.2 1 90.2 SD181 4/23/13 Storm Drain Sheet 3 Office 286.0 16.1 104.8 1 92.5 5D193 4/26/13 Storm Drain Sheet 3 Office 258.0 14.5 93.1 1 82.2 SD194 4/26/13 RETEST #5D193 258.0 14.4 105.7 1 93.3 SD195 4/26/13 Storm Drain Sheet 3 Office 290.0 14.2 102.5 1 90.5 5D196 4/26/13 Storm Drain Sheet 3 Office 288.0 14.4 102.0 1 90.0 SD197 4/26/13 Storm Drain Sheet 3 Office 286.0 14.5 103.1 1 91.0 5D198 4/26/13 Storm Drain Sheet 3 Office 260.0 13.9 104.2 1 92.0 5D199 4/26/13 Storm Drain Sheet 3 Office 292.0 14.0 105.0 1 92.7 5D200 4/29/13 Storm Drain Sheet 3 Office 290.0 15.3 102.2 1 90.2 SD201 4/29/13 Storm Drain Sheet 3 Office 280.0 15.3 102.4 1 90.4 5D202 4/29/13 Storm Drain Sheet 3 Office 270.0 15.1 102.5 1 90.5 5D203 4/29/13 Storm Drain Sheet 3 Office 265.0 16.2 102.2 1 90.2 SD204 4/29/13 Storm Drain Sheet 3 Office 265.0 16.8 102.1 1 90.1 SD205 4/29/13 Storm Drain Sheet 3 Office 265.0 16.2 102.7 1 90.6 Sewer S115 11/6/13 Sewer Office 280.0 8.3 102.6 1 90.6 S116 11/6/13 Sewer Office 261.0 9.2 103.1 1 91.0 S117 11/6/13 Sewer Office 286.0 10.2 106.3 1 93.8 S118 11/6/13 Sewer Office 293.0 9.8 105.7 1 93.3 S119 I 11/6/13 Sewer Office 290.0 10.0 103.8 1 91.6 S120 11/6/13 Sewer Office 288.0 9.6 104.2 1 92.0 S121 I 11/6/13 Sewer Office 286.0 8.7 105.1 1 92.8 FIGURE 7 JOB NAME: La Costa Square Office Site JOB NUMBER: 1211179 I MAXIMUM DENSITY AND OPTIMUM MOISTURE SUMMARY (ASTM D1557) I Soil Maximum Optimum Type Soil Description Density, Pc f Moisture, % 1 Tan Fine Silty Sand 113.3 14.5 2 Tan Fine Silty Sand 106.3 14.7 3 Brown Clayey Sand 119.2 9.7 4 West Canyon Source 113.0 13.9 5 Brown Clayey Sand 129.8 9.1 5a Rock Percent- %5 131.4 8.7 5b Rock Percent- %10 133.1 8.3 5c Rock Percent- %15 134.8 7.9 5d Rock Percent- %20 136.5 7.5 5e Rock Percent- %25 138.3 7.1 5f Rock Percent- %30 140.1 6.7 6 Light Brown Clayey Sand 113.7 15.8 7 Brown Silty Sand 121.9 12.4 8 Yellow Clayey Sand with Gravel 123.8 12.5 9 Brownish Tan Clayey Sand with Gravel 128.0 9.1 10 Brown Silty Sand 125.4 8.6 11 Tan Silty Sand 127.2 9.2 12 White Silty Sand 109.3 15.5 13 Brown -3" Screened Shot Rock 117.0 15.0 13a Rock Percent- %5 118.4 14.3 13b Rock Percent- % 10 119.9 13.6 13c Rock Percent- %15 121.4 12.9 13d Rock Percent- %20 122.9 12.3 13e Rock Percent- %25 124.5 11.6 13f Rock Percent- %30 126.1 10.9 14 Reddish Brown Silty Sand with Rock 119.8 14.0 14a Rock Percent- %5 121.1 13.4 14b Rock Percent- % 10 122.5 12.7 14c Rock Percent- %15 123.8 12.1 14d Rock Percent- %20 125.3 11.5 14e Rock Percent- %25 126.7 10.8 14f Rock Percent- %27 127.3 10.6 15 -1" Screened Wall Select 132.7 8.7 16 Gray Silty Sand 109.7 20.2 17 -3' Screening Res. 'Cut 127.5 10.2 17a Rock Percent- %5 128.7 9.8 17b Rock Percent- % 130.0 9.3 17c Rock Percent- %15 131.2 8.9 17d Rock Percent- %20 132.5 8.4 17e Rock Percent- %25 133.9 8.0 17f Rock Percent- %30 135.2 7.5 18 1"- (Wall Backfill) 127.0 10.0 19 Brown Silty Sand with Rock 132.8 8.0 19a Rock Percent- %5 134.0 7.7 19b Rock Percent- %10 135.3 7.3 19c Rock Percent- %15 136.6 7.0 19d Rock Percent- %20 137.9 6.7 19e Rock Percent- %25 139.2 6.3 19f Rock Percent- %37 142.5 5.5 20 1" Screened Select Wall Backfill 131.9 8.4 21 Tan Silty Sand 116.2 12.5 22 3" Manufactured Capping Material 133.0 10.5 22a Rock Percent- %5 134.4 10.0 22b Rock Percent- % 135.8 9.6 22c Rock Percent- %15 137.2 9.1 22d Rock Percent- %20 138.6 8.7 22e Rock Percent- %25 140.1 8.2 22f Rock Percent- %43 145.7 6.5 23 1' Screened Select Wall Backfill 131.9 7.8 131 Class II Base 137.3 8.2 FIGURE 8