Loading...
HomeMy WebLinkAboutCT 13-04; GOLDEN SURF; HYDROLOGY AND HYDRAULICS REPORT; DWG 496-4A, CDP 13-33; 2016-10-28HYDROLOGY AND HYDRAULICS REPORT APN: 214-531-51 FOR Golden Surf CT 13-04 OWNER: ARZAN DEHMOUBED 6798 PASEO DEL NORTE CARLSBAD, CA 92011 PHONE: (760) 688-9962 LOCATION: I 000 Camino De Las Ondas Carlsbad, CA 920 I I PREPARED BY: SPEAR & ASSOCIATES, INC. CIVIL ENGINEERS AND LAND SURVEYORS 457 Production Street San Marcos, CA 92078 PHONE: (760) 736-2040 FAX: (760) 736-4866 Date: I 0/28/16 -\ l ,./ n · . . -- ·,1. -· DECLARATION OF RESPONSIBLE CHARGE I, HEREBY DECLARE THAT I AM THE CIVIL ENGINEER OF WORK FOR THIS PROJECT, THAT I HA VE EXERCISED RESPONSIBLE CHARGE OVER THE DESIGN OF THIS PROJECT AS DEFINED IN SECTION 6703 OF THE BUSINESS AND PROFESSIONAL CODE AND THAT THE DESIGN IS CONSISTENT WITH CURRENT DESIGN STANDARDS. I UNDERSTAND THAT THE CHECK OF PROJECT DRAWINGS AND SPECIFICATIONS BY THE CITY IS CONFINED TO A REVIEW ONLY AND DOES NOT RELIEVE ME, AS ENGINEER OF WORK, OF MY RESPONSIBILITIES FOR PROJECT DESIGN. L Danny Abada Registered Civil Engineer Spear & Associates Inc. I 0/28/16 DATE TABLE OF CONTENTS I. INTRODUCTION II. DISCUSSION/CONCLUSION SUMMARY OF FLOW RATES ATTACHMENTS A. LOCATION MAP B. HYDROLOGY CALCULATIONS C. HYDRAULIC CALCULATIONS D. DRAINAGE AREA MAP 2 3 6 22 30 I. INTRODUCTION This hydrology report is prepared for Golden Surf, Located at 1000 Camino De Las Ondas, Carlsbad, CA 92011. APN: 214-531 -51. The site is zoned residential and the project consists of developing 5 single family detached residential units in an approximate 0.77 acre site. (approx. 5.2 du/acre) The site has been graded and disturbed from its natural condition. The ground is mostly bare and is covered with a few patches of grass and a few trees. The existing topography ranges from 175 to 158 and slopes in an easterly direction. The existing site drainage flows east towards the adjacent residential development then continues sheet flowing along Lands End Court until it is intercepted by an existing stormdrain system which carries the flow south along Seascape Drive through a 42" RCP. (Reference Grading Plan DWG No. 496-4A) The flow discharges directly into Batiquitos Lagoon, approximately 1.3 miles south, and then continues 0.9 miles west to the Pacific Ocean. The proposed development wi II direct the proposed Areas A I, A2 and the offsite O I flow towards Lands End Court. The proposed areas B and C will be directed to an existing catch basin located approximately 120' east on Camino De Las Ondas. The entire site's runoff confluences inside the existing underground public stormdrain system and is directed to the 42" RCP described above. A post development capacity calculation of the gutter flow and catch basin located at Camino De Las Ondas shows no impact as a result of this development. We have used the County of San Diego Hydrology Manual to determine the run-off from the site for the 10 and I 00-year storm events. Based on the soil hydro logic group map in Appendix A of the County Hydrology Manual, the project soil uniformly consists of type D across all sub areas. The Rational method was used, according to the latest San Diego County Hydrology manual. The site was divided into tributary watersheds and the time of concentration for each watershed was calculated using the longest run with average peak QI 00 flow rates. The time of concentration was then used to calculate each runoff intensity. Then tributary areas factored by runoff coefficients were applied to the rational equation to generate peak flows. Hydraulic calculations were conducted using Hydraflow (as shown in attachment C) to size the proposed pipes in areas A and B and also to analyze the post development gutter flow on Camino De Las Ondas. II. DISCUSSION/CONCLUSION This project will not significantly alter existing drainage patterns along the site or divert runoff from existing conditions. Total I 0-year and 100-year post development peak runoffs from the site will not exceed pre-development rates. This was achieved with lower onsite flow velocities and increased times of concentration. Summary of pre and post development flow rates (cfs) Storm Event JO-year JOO-year (cfs) (cfs) Total Pre-Development to Lands 1.0 1.5 End Court Total Pre-Development to Camino 0.7 1.0 De Las Ondas Total Post-Development to Lands 1.0 1.5 End Court Total Post-Development to Camino 0.7 1.0 De Las Ondas 2 ATTACHMENT A 3 'e1>. .• :,~ e ~('\-~-ij)IS' ~\fi\\.O \>"'' "?_ eoo !l, {~ Cam·moO~~?> caminito Verde ~') ;1 3 · aoo o carninito Rosa . o <2. -:x \ C2,(\')\f\~\O r,3-~ ~ 'I:, =--~ SkysailAve m 822 '!', ~ % ~ 0. ~ .f f ,t.i 1024 g. l 1 _-;mse Rd ~ ~ l •I ~ . ',• I>:> ..J 8 (/1 (J,. 0 "'Cl 1£ ~O' I Q) -n i :r'"' VI J ns (I) :E 9 ~-~ort,Ct ' 0 II> ; -o U) '< Cl) ,-::: -~ z CIJ 0 :E ;::i. ;: (1) >. ~ ~ '° -r;:-.. Dennis' ' ~ ~ C> ~ • ~ 1 f ISite Location I r ... , _Oeacoo Bay'Rd 'II q, 6 Ji.,_~ a: w ~ z s · "' ,\ "' , .., 11 \ g °\' "' lands End Ct 11 ·~ ,uoo ~ camino De Las Oridas 9a0 1000 -.-o C.iinino De_Lils Ondas \ Q) en (\) 0 , 0 ~ ~ "j:. <>' \ ~ ~ ~ 'J;,, ~ .,. ~ ~ ~ £i ;. .~ 9-. ~ % C) -0 % ~~ ~ . '&"O" 'b" ~ <:;)', ,.\. ~ ~ ~ :; (/') (") ~$ o,,$ ~ g Beocon Bay Dr - Seahorse Ct _ ~ ~~ ,::.rs Lighth~l'id h-e,<:.' -~ .::f, ... i .@ Pacific Rim ~entary School 1\1.e!alci.oea 4ve 4. (b :. ~ ~ :n Q.. ATTACHMENT B 6 Post-Development Conditions 100-yr Event REACH TC C A Q cfs I Offsite 01 Resid. 0.57 0.03 0.02 A1 0.5 0.57 0.29 Confluence A' 8.5 0.30 2.50 4.68 1.4 A2 8.7 0.5 0.03 0.02 0.02 2.50 4.61 0.07 (To Lands End Court) Conf. 01 A1, A2, 8.7 I 0.32 2.50 4.61 1.5 (To Camino De Las Ondas) B 9.9 0.5 0.12 0.06 0.06 2.50 4.24 0.3 C 7 0.5 0.05 0.03 0.03 2.50 5.30 0.1 Existing Catch Basin @ Camino De Las Ondas, Confluence Flow Analysi s Offsite 02 5 0.85 0.18 0.15 0.15 2.50 6.59 1.0 Conf. B, C, 02 9.9 0.24 2.50 4.24 1.0 Pre-Development Conditions 100-yr Event REACH TC C A Q cfs Off site Res id. 0.57 0.03 0.02 Site 0.35 0.77 0.27 0.27 (Site To Lands End Court) Confluence , 7.21 0.29 2.50 5.21 1.5 (To Camino De Las Ondas) Offsite 02 I 5 I 0.85 I 0.18 0.15 0.15 2.50 6.59 1.0 (@ Existing Catch Basin @ Camino De Las Ondas) *Rational Method Q crA Soil Type D Note: A runoff coefficient of 0.85 was used for offsite 02 (Camino De Las Ondas), which consists of AC pavement, sidewalk and landscaping. 7 Post-Development Conditions 10-yr Event REACH TC C A Q cfs I Offsite 01 Resid. 0.57 0.03 0.02 A1 0.5 0.57 0.29 Confluence A 1 8.5 0.30 1.70 3.18 1.0 A2 8.7 0.5 0.03 0.02 0.02 1.70 3.13 0.05 (To Lands End Court) Conf. 01 A1, A218.7 I 0.32 1.70 3.13 1.0 (To Camino De Las Ondas) B 9.9 0.5 0.12 0.06 0.06 1.70 2.88 0.2 C 7 0.5 0.05 0.03 0.03 1.70 3.61 0.1 Existing Catch Basin@ Camino De Las Ondas, Confluence Flow Analysis Offsite 02 5 0.85 0.18 0.15 0.15 1.70 4.48 0.7 Conf. B, C, 02 9.9 0.24 1.70 2.88 0.7 Pre-Development Conditions 100-yr Event REACH TC C A Q cfs Offsite Resid. 0.57 0.03 0.02 Site 0.35 0.77 0.27 0.27 (Site To Lands End Court) Confluence 17.21 0.29 1.70 3.54 1.0 (To Camino De Las Ondas) Offsite 02 I 5 I o.85 I 0.18 0.15 0.15 1.70 4.48 0.7 (@ Existing Catch Basin @ Camino De Las Ondas) *Rational Method (Q CIA) Soil Type D 8 'l~tmffmffllllllllllllllllllllllillllillill!ll 1 11111111111il i I I lllllliillllll!llllliil :5 0 .c cii Q) .c s.otx I ::,....i 1-,...,,i \"),.,l_N,.,L~n,~111!111111!1111:11111i1 40L I ::::;...11 f'i.! !"N.:IIN..Jni,.ull+,.LJ~~ll!l!:llil!:t EQUATION = 7.44 P5 D·0.645 = Intensity (in/hr) 3.0f I i -,.....1 I l:,,.J I I I l<::111*1 I !~Ill f1'1,l.l:II I 1..11+.IJ I l~lllillllllil I I I ' I ' I 11: 11111 2.0 I I Kl I I I lrll..Ullll1mlllll~lll'millmlt~~~III 111111 ii i 11111 I ..... ,IJ K-l. ,i ~Ji '! 1' '~ N-, ' ™ ~1 : 11 r-,. ' I ', ]' ' ,, ,1 j,,1 ,, '~ ,,,,! ', "-' ~ ..... ,, ,,1 ' ~, I ; ,I )I~ i i ' "', ',,i. ~ g 1.0 ' ~ !, ~ ~ cp I 0 ~ -0 al Q. 6.0 "2., ! ! I ,..., I i ~ ~, '~ .. ;o.9 ' ~ ~ ' · 5.5 2:?. i ~ ~ I I I .... , ,, ~ ,, 5.0 g ·~o.e ~07 I I i I , IN... J ,, 1,,J I ' 4.5 "§' I I Ii r-, I : I J ,, I ' ' I I ,, (") -. I I 1, 4.0 l I ,, I ~ I I' 0.6 3.5 ~ I ! I II ~~ ' II 1'!' i Ir,, , I f ' ' '. 0.5 I I ' ~ : II I ,1 1, , .. , 1 3.0 - 04 I 2.5 2.0 1.5 1.0 0.11 1 l l ~ I I I \ I \ \ 1 I I \ ) 1 ! \ 1111 I I I\ I I q 1 ; \ i I\ l l I I j: \\ )\ \ 111) l\ I)) \ I ) ) ) l I ) j 1, ) I p I l I ) ) ) it\~ 5 6 7 8 9 10 15 20 30 40 50 2 3 4 5 6 Minutes Hours Duration Intensity-Duration Design Chart -Template Directions for Application: {1) From precipitation maps determine 6 hr and 24 hr amounts for the selected frequency. These maps are included in the County Hydrology Manual (10, 50, and 100 yr maps included in the Design and Procedure Manual}. (2) Adjust 6 hr precipitation (if necessary} so that it is within the range of 45% to 65% of the 24 hr precipitation (not applicaple to Desert). (3) Plot 6 hr precipitation on the right side of the chart. (4) Draw a line through the point parallel to the plotted lines. (5) This line is the intensity-duration curve for the location being analyzed. Application Form: (a) Selected frequency_:..'.:.:_ year 2. 5 4 3 P 6 58 (b) P5 = ---in., P24 = _· __ 'P = %(2) 2 5 24 (c) Adjusted P6<2) = _·_ in. (d) tx = __ min. (e) I = __ in./hr. Note: This chart replaces the Intensity-Duration-Frequency curves used since 1965. P6 1 1.5 2 2.5 3 3.5 4 4.5 5 5.5 6 Duration I I I I I I I 1 I I I 5 263 3.95 5.27 6.59 7.90 9.22 10.54 11.86 13.17 14.49 15.81 7 2.12 3.18" 4.24 5.30 6.3s"7.42 8.48. 9.54 · 10.60.11.66 12.72 10 1.68 2.53,3.37 4.21 5.05.5.90 6.74 7.58 8.42. 9.27 10.11 15 1.30 '195'259' 324 389.4.54. 5.19 5.84 6.49 7.13 7.78 20 1 08 1:62. 2.15. 2.69 3.23. 3.77. 4.31 4.85 5.39 5.93 6.46 25 093 1.40 1.87 2.33 2.80 327' 3.73. 4.20 4.67 5.13 5.60 30 0.83 1.24 1.66 2.07 2.49 290·. 3.32 3.73 4.15 4.56 4.98 40 0.69 1.03 1.38 1.72. 2 07 2.4 ( 2.76 3.10 3.45 3.79 4.13 50 0.60 0.90 1.19 1.49 1.79 2.09. 2.39 2.69 2.98 3.28 3.58 60 0 53 0.80 1.06. 1.33. 1.59 1.86 2.12 2.39 2.65 2.92 3.18 90 0.41 0 61 0.82 1.02 1.23 1.43. 163 1 .84 2.04 2.25 2.45 120 0.34 0.51 0.68 0.85 1.021.19 1.36 1.53 1.70 1.87 2.04 150 029 ·0.44 0.59: 0.73 0.88· 1.03· 1.18 1.32 1.47 1.62 1.76 1so·o:2s·o.390.s2·0.s5·0.1so,91·1.04 1.18 1.31 1.44 1.57 240 0.22 . 0.33 0.43, 0.54. 0.65. 0.76. 0.87 0.98 1.08 1.19 1.30 300 0.19 ·o.2a·o.3s 047 o.ss·o.66· 0.1s o,es o.94 1.03 1.13 360 0 17 0.25 0.33. 0 42 0.50. 0.58. 0.67 0.75 0.84 0.92 1.00 ~-UlR El ~ !! ~ ~ - , ll! -t in ' 33'30' ~::~:~'!: rt= ==:?"'.i.~ I I I I 33"30' . ~ .... , ... 1• Riverside County ----"--,--..;-~- ,,.,. '\!'' I ("'s., \'...',,, , \ \ ! \ i · .. -~ .... ! . ' ' , ' . ' I I ' ... ~ . ·-' ,. . .... \;:~.., A, \ .. ---\ ~ • • , '· ., " --.,~ \ • r.....-n ;_ .,... ,::-.--........ ....................... ...., -~ ........ ~-. ··•.•. . · v '1• •, '• I . \ ~ ~ ! I 33W -) 00 ~ . ~ Cl 8C)IMA 32"'45' 0 Cl ~ • ';) I - I 3 1 16 •••• tt.'ft'>'··: iii· ... : n •••••••••• L o ••• I c: •• i:......._ _I~ ::i ..... •' "<.1' ~ ~"30' ~"30' f r ~ ? t ~ ----- --~ ---- County of San Diego Hydrology Manual • Rairifall Isopluvials 100 Year Rainfall Event-6 Houn •••••••• IIIOl)luvlal C"""-l 117 18'31" 33 06'38" DPW ~GIS ~71'~\b<,., :....,,-.... ~-.,.,..,.,s,....;,.,.. S1fiGIS, \\,e H.1h_ '.'ian D1...,l:".o Cmu\_(l. +N ~'::!..'S'"'~...s=-....,.._...._ .. ,..._.... :=-.,:.:=:-...::.::.=-.:--.......... ., ...... ........ ..,_ ..................... . ..-................ ..... 3 0 3 Mli. e- 10 iii .... 8 ~ Sil .... I C f s . ~ ~ E ~ ! ~ ounty o an Diego 33" -·~ .. ~ Hydrology Manual -··, ?-:~!fr;--_/ Riverside County 33"30' • • 'Q •' ••• , :i / .......,_~~_:_ "r--"r ' ' • ~-~-J ... .--~~ _,,_ __ "'"R. · .... , .. ::_:.::_:.:; I ··· . .• '·-.::~.,:~"' ·.... ·,,:. ·v ··· .. -:::_·-<···· .. ·-.. r -..::.... . ·······-...... ~,~ \ \ -.... ... -.::11 ~.~ ·~ "-•••••••r I I •• • "'•Cl'• .... ' ·, ~ ., 't • • • "'·'"ii'. ..... •'(}., ... • .... , .... -.. ·-······ ..,.. . ..... 0-, .... '.; ...... • .. , • .;:··· .• * . I.II \ ••• Cf_ i \ . .. . ... " ... ~ ... \ I, • : ·,.-6:G""'' ,.• :-•• \ \ :•-.......... ,.,~.~ ·o. \ : ..... \ 1-' : • ..._ :· ••••• -., -.. ••• .: : •' II '• ,., • ,-. •. ••• .... \ •t \ ( •,._~ •'-"\ \ \ • .. , \ : . 'ft?\.\ I •... ,••••, .. '\ ~.. "\ 11 ............ ) l ..... • ,.. ....... \ \ \. -~~-.. , ... ,J I ·~· '---~ ' \\ •• \ : •• \ \ I •, i It .. -·-(•· ....... \"·?..·-'--' i l -~. ; ....... \ t\ ·1 ·~\ ...... _\....... i } ! \ 33"1 I "t1 (,\) n ..... -33"00' -; Oltlll.AMD " • • •• ·~ ~..r-... ~o-···,..-··-... ~ ·· .. r-4" _.: ·-a, ~· •· ~ ,, • ·.. ···-. ............ • .... tif..,.. •••• •• •• 1 \~ ... -~· -. -. --.. -........ ·t··---~·~ '\P'~ ... ~-.... 1,·· ..... ··~ I ..• : ~~ . -··.,.:...... ; ••• 'U J ... _·· ,._ .,~ • ·, \, ... _ • ...:-•-5,1),_....... •••• ...... ···..::·~--··~ 'f, 0 -~ n m ~ ? (,\) -~ 0 0 C: ::, 'l • " -y •I; .. ··: • \\ •,\,i \ ""•""4~ . ~ ·--::: .... -·--·'" .... · ' · •' I .r · '• : ~ ~· \ .. ; \ I Rairifa/1 Isopluvia/s 100 Year Rmd'all Event -24 Houn ........ 11,opll.MIII~) I I ~ . ····-... ~··,'-: .. ···.-.• \\\\' .····· ... ~!'< 32"45' ~ ~\..... : I •• • •• P945' I { I Ol • \ ----,a : •"""• •--...... I : '• \ ~,, ~ •;_ . _. • .. ••' .... ••••• ... ~• .. _ /' /1. V .. ~!!"-••............ &.. .• '\ .. : ,. .. ., \.,,._ '"•-...t .. ____ _ Rtfs S~GIS ~_,;.~~~":.;:.,. 'v.'~ H..i.v..: ~an D~..:g.c, Con.ri..J.! N Ml_.•-,.,a,•non-.,......-.,,..._~~ +:~.=..am:~~ OlilfllWII .................. ::=,,:.:=:-..::::.=-i:--.......... ., ....... 32"30' 32"30' I =.=:-~-..:---f ( S , ~ 2! 3 0 3MIIN --:= ~ co fo e--i -.... -.. :: -____________________________ .... ________________ _ 11 10.0 · • · '' ' ' ,_, 9 · 0tftf1iiiiil1~1+l-tr~\f~\\\\\"ttt\ 8.0 5 · 0 1 T'RJl NJmilimt 3.0 2.0 1--l--i--,f,_ 1-,-+--f-~-4-~~l~l-4-+-0H-t+-1-t-l-!-J.+W_.,j+~ EQUATION 7.44 P6 0-0.645 Intensity (in/hr) 6-Hour Precipitation (in) Duration (min) n 11 I , I , , r 1 1 r I I J 1 '1 I j 1 111,1· 1 ·11, 1 11.i1 5 1 I 'I I I I j ! : I' I jt I I j t 1-111 I I I I 11 1 I 11,1111 6 78910 15 20 30 40 50 1 2 3 4 5 6 Minutes Hours Duration 2.0 1.5 Intensity-Duration Design Chart· Template Directions for Application: ( 1) From precipitation maps determine 6 hr and 24 hr amounts for the selected frequency. These maps are included in the County Hydrology Manual (10, 50, and 100 yr maps included in the Design and Procedure Manual). (2) Adjust 6 hr precipitation (if necessary) so that it is within the range of 45% to 65% of the 24 hr precipitation (not applicaple to Desert). (3) Plot 6 hr precipitation on the right side of the chart. (4) Draw a line through the point parallel to the plotted lines. (5) This line is the intensity-duration curve for the location being analyzed. Application Form: 10 (a) Selected frequency ___ year (b) P -1. 7 . p -3 . 0 p 6 - 5 7 0/ (2) 6 ---in., 24 ----•p -,o (c) Adjusted p6<2l = ~ in. 24 (d) Ix = __ min. (e) I = __ in./hr. Note: This chart replaces the Intensity-Duration-Frequency curves used since 1965. P6 1 1.5 2 2.5 3 3.5 4 4.5 5 5.5 6 Duration I I I I . 1 . I I I I I I 5 2 63 3.95 5.27 6.59 7.90 9.22 1054 11.86 13.17 14.49 15.81 7 212 3.18 4.24 5.30 6.36 7.42 8.48 . 9.54 . 10.60 11.66 12.72 10 1.68 2.s3·3.31· 4,21 ·s.os·5.90 6,74 7.58 a.42 · 9,27 10,11 15 1.30'195'259'324'3,9g'4_54'519 5.84,6.49.7.13.7,78 20 1.os · rn2, 2. 1s' 2.69 · 3.2a · 3.77 · 4.31 · 4.8s · 5.39 5.93 6.46 25 0.93 1.40 1.87 2.33 2.80 3.27 3.73 -;i:20. 4.67 5.13 5.60 30 0.83 1.24 1.66 2.07 2.49 2.90 3.32 3.73 . 4.15 . 4.56 4.98 40 0.69 1.03 1.38 1.72 2.07 2.41, 2.76 . 3.10 3.45 3.79 4.13 50 0.60 0,90 1.19 1.49 1,79 2.09 2,39 2.69 2.98 3.28 , 3.58 so o.53 o.ao' 1.os 133 1.59 1.86 2.12 2.39 2.65 · 2.92 · 31a 90 0.41 0.61 0.82 1.02 123 1.43 163 1.84 2.04 2 25 2.45 120 0.34 0.51 0.68 0.85 · 1.02 1,19 1.36 1.53. 1.70. 1.87 2.04 150 029 ·o.44 0.59, 0.73 0.88103 U8 1.32, 1.47. 1.62 1 76 180 0.26 0.39 0.52 0.65 0.78 0.91, 1.04. 1.18 1.31 , 1.44 1.57 240 0.22 0.33'0.43' 0.54 0.65,0.76 0.87. 0.98. 1.08 1.19 1.30 300 o, 19 · 0.2a' o.38, 0.47 o.s6, o.66 o.75 · o.85 · o,94 1.03 · 1.13 360 0 17 . 0 25 0.33. 0.42 0.50. 0.58. 0.67 . 0,75 0.84 0.92 1.00 ~ ~ St !! ~ : R ~ ~ ~ ~ ;i ;i -- 33"30' ~ran~e rh ----:--... 7! I I I 33°30' Riverside County ·:,?-•••I ._____J__ _.....__ ______ ~ ------.::-,;-,.~....,~ . \,· "'· •. .. .. .. '· ·· ... \, · .. ~,. ·• ... ~··.. ··.• ··\. ·,. \\··.:-. .. \\ \ \ \ •I~\~, • '\ \ \ ... , ...... ··. \ ~ ,.._ '• \• '• ..... ~ -.~ . . ,\ . . . -... ,: l \ ',\\ \ : : . .. .. :-... ··,··. 'If' :\·iv,\ •. •, \ \ . \~ ····•· 15' ····'·oN:,,,;>• •••••• :: ~ I \. \ '• ..._.. ~ \ ~ ~ .. '••••• • t • • ' •, '· : • : • • • •• I /: • •• •••• • .............. -1:4----·+ .... :::::::::::---I ............... + ........ '· -0 -. . •.. --···1·········, '· ..• ....... ••• ••• .. •• I ··-· .. ~ ~ 0 .•••••••••• \ I ·: i I .,... -33'00' .... .M'.f ,--.1; I l k) ',I\~~ I ·= ..... 1 i' .. : 4':://'tsl \~ C 0 Jlt'IIJIJil.&.IU!M'!. .. ,,i 1 .. , ... • •. t • •.. I J UI c_. •.Ji. !o ... ,a :. •• .,; 0 0 r.'i) ~ ~ I ~~ -~;;1~2l -.... :--.:J! ---··,i:\\'·t "-• .,. .... \ .. -. "' • I\ •• I I ~ I 329'48~ ~ 9 ......... ~ •.•. :·1· : • ~" .. • •• •• -~l Ji : i'\ , . ~lv . D .. . 1> • . . j J I / / r-~ I 3 I ?5 ... ~.fr"1 ~ / I o ' ... ,. C: : . .. '< IX--' I ::i ....... 32"30' 32°30' f i: f f f f ----- -.. -- --- County of San Diego Hydrology Manual • Rainfall lsopluvials 10 Year Rainfall Event -6 Houn ........ IIOl)lu,riel (.-.ct.a) DPW ~GIS o-r_.,,,,...,.,~\t' ..... 5 :,.,-_,, .... --. ....-.,..~-"' s1fGIS \X\: H.i.v.: :San :);...:[;:, C()n:r<.....:.! N 1Nif .... llRINDB>.1HQUT ......... OFM#~D1ttel~ + ______ .,. __ _ OF----.,W,..,...._"1,111&......_..~ ~ ............... :=-.,:.:.=-.:.::.-:-.:--_,_,., ....... ==---=-----=---- 3 0 3 Ml• !""'"- 13 ~ r,, ~ !11 r: ~ r,, I .... ~ County of San Diego ... ;: ~ co ~ ... ... ;: 33 Hydrology Manual 33'30' I ,. ,. ''-.'' "\ ......... -.... ,~~\' , I • ... . s. . .,, ... . . ..... .. .. °'\· • ' ·, '· ~ ' '' '\ ·-.. ' .'!i ·' •. .. .............. .., '•.. ,.··, .... \ \ : ... ,~. , • .._)\. ·, ~ I \ ': \\.\\1 ····· ·<?··~.) 1 11 .. l,\"·····7 r'f'~ -,...... -i:t·._ .'iii, ... . .... _ .. ~· .. ; : r,~· ... ·-... \.... \ \ \·· ....... f '\ . .,,....... .... , .. _ .! ; .. -· ·-• •. \_ \ti;, • ~ : .. ;..,, ·t·· \,. t\ ("' I Rai,ifal/ lsopluvials ·. \ \ \ ; \ \ \ --- 33"15' I 'H: . .f ..... ; .... -...... ... , \••\\\ .. ·-·····--;{ :::. :=:> , • • • • • • '• ••••• 15' ..... i I 10 Year Rainfall Event -24 Houn ·····~·-·iZ:9-. ·--·-· I i I I I .......... laopluvial (lnclma) .--. ·._.... • ••• --·~ ~ --11 -··· ~ .... ____ ........ • ; -~"f!:i.. ··::: .. .-·· 1 I o....;.__;·· ··.... l ... .. ~ .. l)'I \ Cl .,.. -33'00' .... Cl 0 I 3 Cl -···-t ~ Ci) l)'I ............ ~ -=> I g> C: ::::, ~ ; . .l, .f \\'\"\ .. ·····-...~ ........ _____ ... ,· l \ l : 32"45' ••• : I / \ . \_ \ \ ... I DPW s1fGIS ~GIS .,....._.,,..~-~ Vlc H.1v...: San Diq;o Cuvuu.i! ~,,,....·-N,..&-.V"' ----,--I + =====-~""'5=" l I L J ........................ M e X \ C f I ::::e:=.e=--==--=-=-- 32'30' -.-..=.------------........ ., __ ........... ~ !!? ~ ~ ~ rr, 32'30' = E:: 3 0 3 MIIN .. ... ~ ~ ~-.. ... 14 San Diego Colmty Hydrology l\.lmmal Ila.le: June 200} Tahle3-l Secti.oo: Page: RUNOFF OOEFFICIENTS FOR URBAN AREAS Land!U!ie I RwmffCoefficimt "C'' Soil 'flw NRCS EBD1!1115 ~ %IMPER. A B Undi:stm:bed NallD'a] Teum (Nmural) Permmeot Open Space a-0.20 0.25 Low Density llesidemrial (IDB) Residential LO DU/A CIC less J 10 0.27 0.32 Low Density llesidemrial (IDR), ResicJe:nri:til 2.0 DU/A CIC less • 20 034 0.38 Low Density llesidetJrial (ID.RJ, ResideJlmill 29 DU/A CIC less J 25 03.8 0.4l Medium Density ResicJentiaJ (MDR) Residential 4.1 DU/A CIC less 30 0.4] 0.45 J Medium Density ResicJentiaJ (MDR) Residenti:111 7.1 DU/A CIC less J 40 0.48 0.51 Medium Density ResicJential (MDR) Residentull 10.9DU/AC1Cless • 45 0.52 0.54 Medium Density Fes:icJentiaJ (MDR) Residenti:1111 14.5 DU/A CIC less • 50 0.55 0.58 Hjgb Density Residential (HDR) Residenti:111 24.0 DU/A CIC less • 65 0.66 0.67 High Density Residential (HDR), Residential 4.i.O DU/A or less go 0.76 0.77 • Comnecial/IDm2s (N. CAIID) N~Commarial go 0.76 0.77 Commm:ia1/Irldn5 (G. CAIID) General Cornrneftial 85 0..80 0.80 COIDllll!ICiallI (O.P. C.om) Office Pmfessiana.JfComme,tial 90 0.&3 0.84 C~(l..im:itedl) Li:mi1'ed! Indnstrial 90 0.&3 0.84 CornrnerciBl/fnrfu cttrial (Genl!nJl I.) General lmtDstrial 95 0..87 0.87 C 030 0.36 0.42 0.45 0.48 0..54 0.57 0.60 0.69 0.78 0.78 0.81 0.84 0.84 0..87 3. 6of26 D 0.35 0.41 0.46 0.49 0.52~ 0 .57 0.60 0.63 0.71 0.19 0 .79 0.82 0..85 0•..85 Olt7 *'lbe values associated with ,Q% :impeivio1ls may be usl!d. fur dimer calallation of the aJil£Jff coefficiPD:t as dl!scribed. in Sectioo 3.1.2 (n!JD!~ ~ pelViam amoff coefficient, Cp, fur ~ !ilill 'l)'pe), CIC fur sreas.1bu"Will :rema:in midistmbed. in peq,etuity. Justifiarimtmust be gi\ll!ll that die area "Will remain lllllUnl :fixeve£ (e.,g., the 8lH is located in Clevelmd. Nmoml Forest). DU/A= dweUiDg UDit5I pee 3ICB! NR.CS = Ndi:ooal RJ!somces Coosenratio:n Senoce u 16 Runoff Coefficient Adjustment Post Development Area Roof Hardscape Parking isle Pervious Pavers Patio Pervious Pavers Landscaping Impervious Area 9274 27.62% Area s.f. 8924 350 7520 740 16040 33574 C = 0.90 x (% Impervious)+ Cp x (1 -% Impervious) % impervious = 27.62% Cp = 0.35 (Table 3.1, soil type D, 0% impervious, County Hydrology Manual) C = 0.50 17 Time of Concentration Initial Additional TC ---Location slope% Initial L (ft) Initial T (min Add'I L (ft) slope% area (ac) Q (cfs) V (ft/s) Inc. T (min) total T (min) (5 minutes mi1 n) * Est. Average Q A1 1.9 65 7 210 1.3 0.63 0.8 2.4 1.5 8.5 A2 1 65 8.7 15 1 8.7 B 1 65 8.7 105 1 0.13 0.2 1.5 1.2 9.9 C 1.9 60 7 0 7.0 Pre-Dev. 9 100 6.5 80 6 Kirpish Formula 0.7 7.2 Offsite 02 6 100 2.5 180 6 5.0 !(Camino De Las Ondas) Initial Initial TC 02 Pre-Dev A1 A2 B C Overland Flow C= 0.85 0.35 0.5 0.5 0.5 0.5 (Figure 3-3) D ft= 100 100 65 65 65 65 T min= 1.8(1.1-C)D112 S%= 6 9 1.9 1 1 1.9 8113 T= 2.5 6.5 7.0 8.7 8.7 7.0 Pre-Development Overland Travel Time Kirpish Formula Pre-Dev Tc min= (11.9L3/t,E)°-385 t,E ft= 5 L Feet= 80 L miles= 0.015152 T hours= 0.011051 T min= 0.7 18 <.D 100 I-UJ UJ u. ?; 0 UJ t) z <C I-rn i5 w (/) a:: :::> 0 (.) 0: lU I-<( ~ 30 (/) I:: ::i z 20 ~ z UJ :; i= ~ u. 0 C-;;;j 10 z :5 er w > 0 ~ 0 EXAMPLE: Given: Watercourse Distance (D) = 70 Feet Slope (s) = 1.3% Runoff Coefficient (C) = 0.41 Overland Flow Time (T) = 9.5 Minutes C " T= 1.8(1.1-)VD 3Vs. SOURCE: Airport Drainage, Federal Aviation Administration, 1965 FIGURE --·-------·- Rational Formula ~ Overland Time of Flow Nomograph 3.3 Channel Report Hydraflow Express Extension for AutoCAD® Civil 30® 2009 by Autodesk, Inc. Friday, Oct 28 2016 Area A 1 TC Longest Path Earthen Swale with Average Q Triangular Highlighted Side Slopes (z: 1) = 2.00, 2.00 Depth (ft) = 0.38 Total Depth (ft) = 0.50 Q (cfs) = 0.700 Area (sqft) = 0.29 Invert Elev (ft) = 100.00 Velocity (ft/s) = 2.42 Slope(%) = 1.30 Wetted Perim (ft) = 1.70 N-Value = 0.020 Crit Depth, Ye (ft) = 0.38 Top Width (ft) = 1.52 Calculations EGL (ft) = 0.47 Compute by: Known Q Known Q (cfs) = 0.70 Manning's n = 0.02 was used for the earthen swale per San Diego County Hydraulic Design Manual. Elev (ft) 101.00 100.75 100.50 100.25 100.00 0 The velocity was calculated using Hydraflow to estimate the time of concentration using the average flow rate within area Al Section Depth (ft) 1.00 .5 1.5 2 2.5 3 20 Reach (ft) Channel Report Hydraflow Express Extension for AutoCAD® Civil 30® 2009 by Autodesk, Inc. Friday, Oct 28 2016 Area 8 TC Longest Path Earthen Swale with Average Q Triangular Highlighted Side Slopes (z: 1) = 2.00, 2.00 Depth (ft) = 0.22 Total Depth (ft) = 0.50 Q (cfs) = 0.150 Area (sqft) = 0.10 Invert Elev (ft) = 100.00 Velocity (ft/s) = 1.55 Slope(%) = 1.00 Wetted Perim (ft) = 0.98 N-Value = 0.020 Crit Depth, Ye (ft) = 0.21 Top Width (ft) = 0.88 Calculations EGL (ft) = 0.26 Compute by: Known Q Known Q (cfs) = 0.15 Manning's n = 0.02 was used for the earthen swale per San Diego County Hydraulic Design Manual. Elev (ft) 101.00 100.75 100.25 100.00 0 The velocity was calculated using Hydraflow, to estimate the time of concentration using the average flow rate within area B Section Depth (ft) 0.50 .5 1.5 2 2.5 3 21 Reach (ft) ATTACHMENT C 22 Channel Report Hydraflow Express Extension for AutoCAD® Civil 30® 2009 by Autodesk, Inc. Q100 Pipe Sizing for C.B. @ Area A2 To C.B. @ A 1 Circular Diameter (ft) = 0.50 Invert Elev (ft) = 100.00 Slope(%) = 9.40 N-Value = 0.009 Calculations Compute by: Known Q Known Q (cfs) = 0.07 Elev (ft) 100.75 100.50 100.25 100.00 0 Highlighted Depth (ft) Q (cfs) Area (sqft) Velocity (ft/s) Wetted Perim (ft) Crit Depth, Ye (ft) Top Width (ft) EGL (ft) = = = = = = = = Friday, Oct 28 2016 0.06 0.070 0.01 5.19 0.35 0.13 0.33 0.48 Section 23 Reach (ft) Channel Report Hydraflow Express Extension for AutoCAD® Civil 30® 2009 by Autodesk, Inc. Friday, Oct 28 2016 Q100 Pipe Sizing For Conti. @ NE Corner of Area A 1 C.B. to South C.B. @A 1 Circular Diameter (ft) = 0.67 Invert Elev (ft) = 100.00 Slope(%) = 2.90 N-Value = 0.009 Calculations Compute by: Known Q Known Q (cfs) = 1.40 Elev (ft) 101.00 100.75 100.50 100.25 100.00 0 Highlighted Depth (ft) Q (cfs) Area (sqft) Velocity (ft/s) Wetted Perim (ft) Grit Depth, Ye (ft) Top Width (ft) EGL (ft) = = = = = = = = 0.32 1.400 0.17 8.38 1.03 0.56 0.67 1.41 Section 24 Reach (ft) Channel Report Hydraflow Express Extension for AutoCAD® Civil 30® 2009 by Autodesk, Inc. Friday, Oct 28 2016 Q100 Pipe Sizing, Conti. 01, A 1 & A2 @ C.B. To Outlet@ Lands End Ct Circular Highlighted Diameter (ft) = 1.00 Depth (ft) = 0.25 Q (cfs) = 1.500 Area (sqft) = 0.15 Invert Elev (ft) = 100.00 Velocity (ft/s) = 9.70 Slope(%) = 5.20 Wetted Perim (ft) = 1.05 N-Value = 0.009 Crit Depth, Ye (ft) = 0.52 Top Width (ft) = 0.87 Calculations EGL (ft) = 1.71 Compute by: Known Q Known Q (cfs) = 1.50 Elev (ft) Section Depth (ft 102.00 101.50 101.00 100.50 100.00 0 2 3 25 Reach (ft) Channel Report Hydraflow Express Extension for AutoCAD® Civil 30® 2009 by Autodesk, Inc. Q100 Pipe Sizing for C.B. @ Area B To Outlet Circular Diameter (ft) = 0.50 Invert Elev (ft) = 100.00 Slope(%) = 2.00 N-Value = 0.009 Calculations Compute by: Known Q Known Q (cfs) = 0.30 Elev (ft) 101.00 100.75 100.25 100.00 0 Highlighted Depth (ft) Q (cfs) Area (sqft) Velocity (ft/s) Wetted Perim (ft) Grit Depth, Ye (ft) Top Width (ft) EGL (ft) 1 Friday, Oct 28 2016 = 0.18 = 0.300 = 0.06 = 4.69 = = = = 0.64 0.28 0.48 0.52 Section 26 Reach (ft) Channel Report Hydraflow Express Extension for AutoCAD® Civil 30® 2009 by Autodesk, Inc. Tuesday, Sep 27 2016 Post Dev. Q100 Gutter Flow Analysis@ Camino De Las Ondas Gutter Highlighted Cross SI, Sx (fUft) = 0.02 Depth (ft) = 0.12 Cross SI, Sw (ft/ft) = 0.08 Q (cfs) = 1.000 Gutter Width (ft) = 1.50 Area (sqft) = 0.09 Invert Elev (ft) = 100.00 Velocity (fUs) = 11.11 Slope(%) = 6.00 Wetted Perim (ft) = 0.24 N-Value = 0.013 Crit Depth, Ye (ft) = 0.24 Spread Width (ft) = 1.50 Calculations EGL (ft) = 2.04 Compute by: Known Q Known Q (cfs) = 1.00 Elev (ft) Section Depth (ft) 101.00 1.00 100.75 0.75 100.25 ~ ~ _/ N7 ~ ~ 100.50 0.50 0.25 100.00 V 0.00 99.75 -0.25 0 5 10 15 20 25 30 35 27 Reach (ft) 411 a= Figure 2-4 0.01 -+-~~~~~~~~~~~--'-~~~-+--'-~~~~~~~~~~~~~---I 0.01 0.1 Depth of Approach Flow (ft) Figure 2-4 Interception Capacity of Curb Opening Inlet on Continuous Grade San Diego County Drainage Design Manual (July 2005) Page 2-14 1 28 Interception Capacity of Curb Opening Inlet on Continuous Grade Gutter Opening Total Capacity Location Q cfs Slope Flow Depth Depression a *2Capacity cfs/ft Len!:lth cfs Catch Basin @ Camino De Las Ondas Capacity Calculation 0.1 6 0.12 4" 0.21 5.00 0.11 *2 San Diego County Drainage Manual FIGURE 2-4 29 ATTACHMENT D 30 / \ 0 0 ~ 0 z ...J w C 0 w ~ 1 .. d., ' ;,i ' ;: ,, ,, I _-_, EX. PeJKINC LOf '---+~·1~'..---=,t===~~-::er~-::::::;::::::~ Ch. SICE.w.,_o==-'j,----(• ~ -(_,-vi\ ,_--1------~! ' CONG n, AS."H I ," r: ~': ;. ·:,: u I :, <, ,, 1 ',,_,. l ____ _'_r---- I '' '' -·--"-- I Ii Ji ' ' r: ,, :1 ,, ,, PLANS PREPARED B~ SPEAR & ASSOCIATES, INC. CIVIL ENGINEERING & LAND SURVEYING 475 PRODUCTION STREET, SAN MARCOS, CA 92078 PHONE (760) 736-2040 FAX (760) 736-4866 WWW.SPEARING.NET 20 /, ' ' ---IJ..__ ---,_ 10 I , ____ ) ~I<. CHAI~ LINK 1'£NCC EX. G~.'lAGE -OFFSlljE , 0.03 A(J:RES 0 20 DRAINAGE AR~ SURFACE BUILDING ROOFTOP HARSCAPING/SIDEWALK PARKING/DRIVE AISLE {PERVIOUS PAVERS) PATIO PERVIOUS HARDSCAPE 40 60 LANDSCAPING TOTAL LOT AR~ SYMBOL SOIL TYPE DRAINAGE AR~ '.4. 1/'.HN TYPED 8,924 SQ FT Ii I ' 11 TYPED 350 SQ FT ' I ' .\.i ~i;~!~ ~~!;~! TYPED 7,520 SQ FT TYPED 740 SQ FT {:<::;;:::J TYPED 16,040 SQ FT JJ,574 SQ FT , ;\;_ '\ -.. ;',// I --"-:1.e::· I '/,siJs :.,. I FL " \ ' I • ' . _j \,\ '·.;,----------" • \ I \, ,, I I I ' (/54.59) RI!./ 147.57 ,,w + .. -.. , t- _CON_c_j/ 0 \JI -1-.:-:- 1-- I I' ~/ ' I \ ~ \ \ i ::-. - .---,_ -··--.,,----- --->c:.o - POST DEVELOPMENT DRAINAGE MAP FOR: GOLDEN SURF 1000 CAMINO DE LAS ONDAS Ill l ! i I ' i. ! ! : I I I I I I I 1 I 0 0 I i r- 1 I I -r-- 1 0 -~ . ,,,1,_ ~ in· 1' I ASP.H I I T I 11 ' ,, I' 1, ,, Ii ~ ir 1: :;; ~1·IJ1 PLANS PREPARED BY: ~ I,':. SPEAR & ASSOCIATES, INC. ~ ~.J::ii:~" CIVIL ENGINEERING & LAND SURVEYING :a ~1\11 475 PRODUCTION STREET, SAN MARCOS, CA 92078 -~ PHONE (760) 736-2040 FAX (760) 736-4866 ~ 1 V WWW,SPEARINC.NET ~ ~ ~~~<"'.~Sc~ "' ~~~~.~~-~ ~~~"~ A~~~ y--= ' 20 10 I 0 20 40 60 ' SCALE.· /" = 20' i I I I + t- PRE DEVELOPMENT DRAINAGE GOLDEN SURF 1000 CAMINO DE LAS 1" I MAP 1 ·~ -, cm,c \ \ ,-·-.--_ FOR: ONDAS I ' I I. I i ' I ! I i I I I I I I i I I I I. I, ' ' J [ I ' I, I i ! ' i: I I' i' I I I, : : i I I, ' ' ii '' I I I: I, I I '' I i I , ' 'I !