Loading...
HomeMy WebLinkAboutCT 14-10; POINSETTIA 61; THIRD PARTY GEOTECHNICAL REVIEW (THIRD REVIEW); 2018-04-25' HETHERINGTON ENGINEERING, INC. SOIL & FOUNDATION ENGINEERING• ENGINEERING GEOLOGY• HYDROGEOLOGY City of Carlsbad Community & Economic Development 1635 Faraday Carlsbad, California 92008-7314 Attention: Mr. Jason Geldert April 25, 2018 Project No. 8462. l Log No. 19807 Subject: THIRD-PARTY GEOTECHNICAL REVIEW (THIRD REVIEW) Poinsettia 61 Development Carlsbad, California GR2017-0052 References: Attached Dear Mr .. Gelder!: In accordance with your request, Hetherington Engineering, Inc. has provided third-party geotechnical review of References 11 and 12. The Geotechnical Consultant has responded to our prior comments and we have no additional comments. Observation and testing by the Geotechnical Consultant during construction should be required to verify anticipated conditions or to revise the geotechnical recommendations as considered necessary. A final geotechnical report of construction should be required. The opportunity to be of service is sincerely appreciated. If you have any questions regarding this report, please contact this office at your convenience. Mark D. Hethe 1 Civil Engineer 30 Geotechnical Engineer ( expires 3/31/20) Distribution: I-via e-mail (Tecla.Levy@carlsbadca.gov) ]-via e-mail (Jason.Geldert@carlsbadca.gov) 5365 Avenida Encinas, Suite A• Carlsbad, CA 92008-4369 • (760) 931-1917 • Fax (760) 931-0545 333 Third Street, Suite 2 • Laguna Beach, CA 92651-2306 • (949) 715-5440 • Fax (760) 931-0545 www.hetheringtonengineering.com ---------------- • REFERENCES I. "Soil and Geologic Reconnaissance, The Bridges at Poinsettia, Carlsbad, California", by Geocon, Incorporated, dated June 22, 2006. 2. "Report of Geotechnical Investigation, Poinsettia 61 Development, Carlsbad, California", by Group Delta Consultants, dated November 20, 2014. 3. "Slope Stability Considerations, Poinsettia 61 Development, Carlsbad, California", by Group Delta, dated March 6, 2015. 4. "Remedial Grading Summary and Plan Review, Poinsettia Development (EIRI 5-03), Carlsbad, California," by Group Delta Consultants, dated September 21, 2016. 5. "Supplemental MSE Retaining Wall Recommendations, Poinsettia 61 Development, Carlsbad, California," by Group Delta Consultants, dated July 12, 2017. 6. "Geotechnical Review of MSE Wall Plans, Poinsettia 61 Development, California, California", by Group Delta, dated August 28, 2017. 7. "Poinsettia Bridges Foundation Plan," by Moffatt and Nichol, dated October 4, 2017 (2-sheets). 8. "Supplemental Infiltration Information, Poinsettia 61 Development, Carlsbad, California", by Group Delta, dated December 8, 2017. 9. "Foundation Report, Poinsettia Lane Bridges Carlsbad, California", by Group Delta, dated December 22, 2017. 10. "Third-Paity Geotechnical Review (Second Review), Poinsettia 61 Development, California, California, GR2017-0052", by Hetherington Engineering, Inc., dated March 5, 2018. 11. "Response to Geotechnical Review Comments (Second Review), Poinsettia 61 Development, Carlsbad, California", by Group Delta, dated April 3, 2018. 12. Slope Stability input/output files for SLOPE/W analyses. HETHERINGTON ENGINEERING, INC. Project No. 8462. I Log No. 19807 -----------·-----------