Loading...
HomeMy WebLinkAboutCT 72-20; LA COSTA VALE UNIT 2; SOILS REPORT; 1975-01-10• BENTON ENGINEERING. INC.~~ APPLIED SOIL MECHANICS -FOUNDATIONS /l.~'" J 6717 CONVOY COURT V SAN DIEGO, CALIFORNIA 92111 PHILIP HENKING BENTON PRESIDENT· CIVIL ENGINEER January 10, 1975 La Costa Land Company Costa Del Mar Road Carlsbad, California 92008 Subject: Gentlemen: Project No. 72-12-5DF Results of Field Density Tests Taken in Compacted Subgrade, Subbase and Base Material . La Costa Vale Unit No.2 Carlsbad Tract No. 72':'20.2 Carlsbad, California TELEPliONE (714) 565-1955 RECEIVED JAN 1 ~ 1975 CITY OF CARLSBAD EngIneering Department This is fo report the results of field densHy tests taken in compacted subgrade, subbase and base materials placed on the street areas of La Costa Vale Unit No.2 in Carlsbad, California. The tests were taken during the weekl'y periods indicated below: Test Number Week Ending Tests Taken in Subgrade and Subbase 1 to 17, inclusive 18 to 48, inclusive 49 to 70, inclusive 71 to 78, inclusive 79 to 91, inclusive Tests Taken in Base Material to 34, inclusive 35 to 62, inclusive, November 16, 1974 November 23, 1974 November 30, 1974 December 7, 1974 December 15, 1974 December 14, 1974 December 21, 1974 The approximate locations at which the tests were taken and the final test results are presented on pa9~s 3 to 10, inclusive, under the IITable of Test Results.1I The laboratory d.eterminations of the maximum dry densities and optimum moisture contents of the materials are 'presented ~n page 11, under the II Laboratory Test Resu I ts. II >, 0' Profect No. 72-12-5DF • -2-Janu.ary 10, 1975 , La Costa Vale Unit No.2 The final resul ts of the tests incHcate that the subgrade sorls have been compacted to at least 90 percent of maximum dry density and that the subbase and base materi.als have been com'- pacted to a minimum of 95 percent of maximum dry density. Respectfully submitted, BENTON ENG.INEERING, INC. BY-R'~~ R. C. Remer Reviewed by ~.2~JL f%t4_ ' ~nton, Civi -n "neer . RCR/PHB/pk Distr:' (4) Addressee ( 1 ) Addressee Attention: Mr. Burton L. Kramer . (2) City of Carlsbad Engineering Department (1) Rick Engineering Company, Carlsbad BENTON ENGINEERING;. INC. ; Proiect No. 72-12-50 • -3-e January·l,O., 1975' ., La Costa Vale Unit No.2 ,,' TABLE OF TEST RESUlTS Mdximum Approx-Type or Fteld Dry Dry Test imate Material Moisture Density Density Percent " No. Location Tested 0/0 dry wt Ib/cu ft Ib/cu ft Compaction Remarks Tests Taken in Subgrode and Subbase 1 La Costa Ave. Subgrade 12.1 112.3 118.8 94.7 Sta. 102+00 2 La Costa Ave. Subgrade 13.2 111.4 118.8 93.9 Sta.92+OO 3 La Costa Ave. Subgrade 12.4 113.2 121.6 93.2 Stat 88+00 4 Velero Ct. Subgrade 14.3 105.3 110.9 95.2 Stat 0+00 5 Retiro St. Subgrade 7.9 118.8 ·128·.0 92.9 Stat 9+00 6 Cadencia St. Subgrade 5.0 111.7 121.6 92.0' & Retiro St • . Std. 22+00 7 Cadencia St. Subgrade 6.0 113.8 123.6 92.2 Sta. 31+00 8 Cadencia St. Subgrade 4.7 106.2 116.8 91.0 Sta. 28-t<>0 9 Venado St. Subgrade 7.4 113.3 123.6 91.8 Sta. 4+00 10' Venado St. Subgrade 10.3 114.4 123.6 92.7 Stat 7+00 .. 11 Quinto St. Subgrode 11.7 113.7 123.6 92.2 Sta. 2-tOO 12 Venado St. Subgrode 10.9 108.5 118.3 91.7 Stat 5+00 13 Venado St. Subgrade 10.2 113.4 123.6 92.0 Sta. 12400 14 Piragua St. Subgrade 12.2 108.2 118.3 91.5 Sta. 22+50 15 Pirogua St. Subgrade 12.7 109.0 118.3 92.1 Stat 31+00 16 Cadencfa Subgrade 10.0 108.3 118.3 91.5 Sta. 32+00 17 Cadencta Subgrade 8.8 112.3 121.6 92.5 Sta. 35+50 18 La Costa Ave. Subbase 10.5 110.0 114.0 96.4 Stat 103+00 19 La Costa Ave. Subbase 13.6 107.2 114.0 94.2 Reworked' Sto. l02-tOO 20 La Costa Ave. Subbase 12.5 110.2 114.0 96.9 Sta. 1 01-tOO BENTON ENGINEERING, INC. . Protect No. 72-12-50 e -4-e January 10; 1975 La Costa Vale Unit No.2 TABLE OF TEST RESULTS (CaNT.) MaxImum Approx-Type of Field Dry Dry Test imate Material Moisture Density Density Percent No. Location Tested % dry wt Ib/cu ft Ib/cu ft Compaction . Remarks ! es ts Taken in Subgrade and Subbase (Con t. ). 21 La Costa Ave. Subbase 8.7 115.2 118.2 97.4 Sta. 99+00 22 La Costa Ave. Subbase 9.5 109.0 114.0 95.7 -Sta.97+00 23 La Costa Ave. Subbase 11.2 108.3 i 14.0· 95.0 Reworked Sta. 88+00 24 La Costa Ave. Subbase 9.9 107.6 118.2 91.0 Reworked Sta .• 91+00 25 Quinta St. Subbase 9.5 113.5 118.2 96.0 Sta. 1+50 26 Qu.inta St. Subbase 10.7 109.3 114.0 95.9 Sta. 3+50 27 Retiro St. Subbase 10.9 117.5 118.2 99.4 Sta. 4+50 28 La Costa Ave. Subbase 12.1 112.3 114.0 98.7 Check on #19 Sta. 102+00 29 La Costa Ave. Subbase 11.9 109.8 114.0 96.4 Check on #23 Sta.88+00 30 La Costa Ave. Subbase 11.5 112.7 114.0 99.0 . Check on #24 Sta. 91+00 31 La Costa Ave. Subbase 8.1 114.8 118.2 97.2 Sta. 93+00 32 La Costa Ave. Subbase 12.0 109.3 114.0 96.0 Sta. 95+00 33 Retlro St. Subbase "8.7 111.3 115.2 96.5 Sta.8+00 34-Velero Ct. Subbase 10.3 109.8 114.0 96.4 Sta. 0+50 35 Velero Ct. Subbase 10.3 108.8 114.0 95.5 Sta. 2+00 36 Velero Ct. Subbase 11.5 108.8 114.0 95.5 Sta.4+00 37 Retiro St. Subbase 10.3 110.8 1-15.2 96.2 Sta. 10+00 38 Retiro St. Subbase 10.1 114.5 118.2 96.9 Sta. 16+00 39 Venado St. Subbase 8.9 113.2 118.2 95.7 Sta. 1+00 40 Venado St. Subbase 9.5 115.2 118.2 97.6 Sta. 2+00 BENTON ENGINEERiNG. INC. • Project No. 72-12-50 e -5--January '10,-1975 La Costa Vale Unit No.2 TABLE OF TEST RESULTS (CONT.) Maximum Approx-Type of Field Dry Dry Test imate Material Moisture Density Density Percent No. -Location Tested % dry wt Ib/ cu .ft Ib/cu ft Compac;:tion Remarks Tests Taken in Subgrade and Subbase (Cont.) 41 Venado St. Subbase 8.9 114.3 118.2 96.7 Sta. 6+00 42 Venado St. Subbase 10.0 114.6 118.2 97.0 S to. 1 0+00 43 Venado St. Subbase 10.5 111.3 114.0 97.6 Sta. 14+00 44 Venado St. Subbase 11.3 110.3 114.0 96.7 Sta. 18+00 45 Piragua St. Subbase 8.0 109.6 114.0 '96.0 Sfa. 20+00 46 Piragua St. Subbase 7.0 108.7 114.0 95.4 Sta. 23+00 47 Piragua St. Subbase 13.2 110.0 114.0 96.5 Sta. 32-1{)0 48 Piraeua St. Subbase 10.9 115.3 118.2 97.7 Sta. 36+00 49 Piragua St. Subbase 8.5 112.6 118.2 95.3 Sta. 26+00 50 Cadencia Sf. Subbase 8.5 113.6 118.2 96. 1 Sta. 38+00 51 Coden cia St. Subbase 8.0 115.8 118.2 97.9 Sta. 34+00 52 Cadencia St. Subbase 4.2 107.5 110.7 97.2 StQ. 30+00 53 Cadencia St. Subbase 8.2 113.3 118.2 95.9 Sta. 24+00 54 Cadencla St. Subbase 7.3 115.2 118.2 97.5 Sta. 22+00 55 Cadencia Sf. Subbase 10.6 ' 112. 1 117.1 95.7 Sta.20+00 56 Venado St. Subbase 4.3 105.6 110.7 95.3 Sta. 16+00 57 Piragua St. Subbase 13.6 114.0 117.1 97.4 Sta. 28+00 58 LC! Costa Ave. Subbase 7.5 105.4 110.7 95.3 Sfa. 104+00 59 Cadencia St. Subbase 8.5 111.1 115.2 96.4 Sta." 18+00 60 Cadencla St. Subbase 10.5 108.5 114.0 95.2 Sta. 26+00 BENTON ENGINEERING, INC. • Proiect No. 72-12-50 e -6-January. 10, '1975 La Costa Vale Unit No.2 TABLE OF TEST RESULTS (CaNT.) Maximum Approx-Type of Field Dry Dry Test imate Material Moisture Density DensHy Percent No. Location Tested % dry wt Ib/cu ft Ib/cu ft Compaction Remarks Tests Taken In Subgrade and Subbase (Cont.) 61 Velero Ct. ' Subbose 13.2 102.6 114.0 90.0 Reworked Sta. 0-f{)0 62 Retiro St. Subbase 11.8 110.5 118.2 93.5 Reworked Sta.' 14-f{)0 63 Velero Ct. Subbase 5.8 107.5 110.7 97.2 Sta,. 3+00 64 Retiro St. Subbase 9.7 115.5 121.6 95.0 Sta. 6-f{)0 65 Retiro Sf. Subbase 10.3 116.2 118.2 98.5 Sta. 12-f{)0 66 'Retiro St. Subbase 9.5 112.3 117.1 96.0 . Sta. 18-f{)0 67 Cadencia St. Subbase 9.6 115.2 118.2 97.4 Sta. 28+00 68 Cadencia St. Subbase 10.8 114.0 118.2 96.4 Sta. 16+70 69 Piragua St. Subbase 13.3 110.0 114.0 96.5 StaG 30+00 70 . Piragua St. Subbase 11.1 110.3 114.0 96.9 Sfa. 24+50 71 Piragua St. Subbase 7.5 115.7 118.2 9S.0 Sta. 34-f{)0 72 Piragua St. Subbase 7.2 116.3 118.2' 98.3 Sta. 36+40 73 Velero Ct. Subbase 12.0 110.2 114.0 96.8 Check on #61 Sta. O-l{)() 74 Refiro St. Subbase 9.1 106.3 115.5 92.J Reworked Sta. 14-f{)0 75 Retiro Sf. Subbase 7.8 117.4 118.2 99.4 Check on #62 Sta. 14-f{)0 and #74 76 COdencia, St. Subbase 10.7 110.3 114.0 96.8 Sta. 25-f{)0 77 Cadencia St. Subbase 9.2 112.8 118.2 95.3 Sta. 27+00 78 Cadencia St. Subbase 9.6 118.6 120.6 98.3 Sta. 29+00 79 Retiro Sf. Subbase 9.9 110.2 115.5 95.5 Sta. 5-f{)O 80 Retiro St. Subbase 6.2 107.7 110.2 97.6 StaG 7+00 BENTON ENGINEERING. INC, Profect No. 72-12-5D e -7--January 10;' 1975 La Costa Vale Unit No.2 TABLE OF TEST RESULTS (CaNT.) Maximum Approx-Type of Field Dry Dry Test imate Material Moisture Density' Density Percent No. Location Tested % dry wt Ib/cu ft Ib/cu ft Compacti.on Remarks Tests Taken in Subgrade and Subbase (Cont.) 81 Retiro St. Subbase 7.0 108.6 114.0 95.2 Sla.4+10 82 Piragua St. Subbase 9.4 113.7 118.2 96.3 Stat 19+00 83 P'jragua St. Subbase 1107 ' 113.8 118,.2 96.3 Sta. 21-+00 84 Piragua St. Subbase 14~3 111.9 114.0 98.3 Stat 24+00 85 Venado St. Subbase 13.8 111.7 114.0 98.2 Sta. 11+00 86 Venaao St. Subbase 13.9 109.0 114.0 95.7 Sta. 15+00 87 Venado St. Subbase 14.6 99.8 110.2 90.7 Reworked Sta. 17+00 88 Venado St. Subbase 12.9 108.3 114.0 95.2 Stat 9+00 '89 Venado St. Subbase 10.7 109.5 114.0 96.2 Stat 7+00 90 Vertado St. Subbase 15. 1 108.1 110.2 98.0 Check on #87 Stat 17-+00 91 Venado St. Subbase 9.3 112.8 118.2 95.5 Sta,. 20+00 Tests Taken in Base Material' 1 La Costa Ave. Base 6.4 124.0 132.3 93.7 Reworked Stat 103+00 2, La Costa Ave. Base 6.4 126.7 132.3 95.7 Stat 101+00 3 La Costa Ave. Base 7. 1 127.2 132.3 96.2 Stat 99+00 4 La Costa Ave. Base 5.0 127.4 132.3 96.3 Stat 97+00 5 La Costa Ave. Base 7.8 126.3 132.3 95.5 Stat 95+00 6 'La Costa Ave. Base 6.7 126.8 132.3 95.8 Sta. 93+00 7 La Costa Ave. Base 6.5 127.4 132.3 96,.3 Stat 91+00 8 La Costa Ave'. Base 7.2 125.9 132.3 95.1 Stat 89+00 BENTON, ENGINEERING. INC, . Protect No. 72-12-50 e -8-• January.·10, 1975 La Costa Vale Unit No.2 TABLE OF TEST RESULTS (CaNT.) Maximum . Approx-Type of Field Dry Dry Test imQte Material Moisture Density Density Percent No. Location Tested % dry wt Ibl cu ft Ibl cu ft Compaction Remarks Tests Taken in Base Material 9 La Costa Ave. Base 5.0 130.3 132.3 98.5 Check on #1 Sta. 103~ 10 La Costa Ave. Base 8.9 125.0 132.3 94.5 Reworked Sta. 87fOO 11 Piragua St. Base 5.9 121.3 132.3 91.7 Reworked Sta. 28+50 12 Piragua St. Base 6.0 126.5 132.3 95.7 Sta. 36+00 13 Piragua St. Base 6.6 125.8 . 132.3 95.0 Sta. 34+00 14 Piragua St. Base 5.4 126.2 132.3 95.5 Sta. 32+00 15 Piragua· St. Base 7.8 123.4 132.3 93.3 Rewo~ked Sta. 30fOO 16 . Venado St. Base 5.6 126.3 132.3 95.5 Sta. 0+50 17 Venado St. Base 7.4 125.9 132.3 95.1 Sta. 2+50 18 Venado St. Base 5.4 122.2 132.3 92.3 Reworked Sta. 4+50 19 Venado St. Base 5.2 125.5 132.3 95.0 Sta. 6+50 20 Venado St. Base 5. 1 126.3 132.3 95.5 Sta. 8+50 21 Venado St. Base 7.3 126.0 132.3 95.2 Sta. 10+50. 22 Venado St. Base 5.4 129.7 133.9 97.0 Sta. 12+50 23 Venodo St. Base 5.8 128 •. 3 133.9 95.9 Sta.14+50 24 Venado St. BasE\' 7.3 126.0 132.3 95.3 Sto. 16+50 25 Venado St. Base 5.0 . 129.6 133.9 96.9 Sta. 18+50 26 Piraguo St. Base 10.0 129.8 133.9 96.9 Sta. 20+50 27 Piragua St. Base 5.7 131.3 133.9 98.2 Sta. 22+50 28· Pirogua St. Base 7.7 129.4 133.9 96.7 Sta. 24+50 BENTON ENGINEERING. INC. '" .. ~ Project No. 72-12-SD ·e -9-• January 10, -1975 ~ La Costa Vale Unit No.2 TABLE OF TEST RESULTS (CaNT.) Maximum Approx-Type of Field Dry Dry Test imate Material Moisture Density Density Percent No. Lotation Tested % dry wt Ib/cu ft Ib/cu ft Compaction Remarks Tests Taken in Base Material 29 Piragua St. Base 6.0 130.8 133.9 97.7 Sta. 26+50 30 Piragua St. Base 6.0 128.3 133.9 95.8 Check on #11 Sta. 28+50 Check on #18 31 venado St. Base 6.8 126.4 132.3 95.7 Sta. 4+50 32 La Costa Ave. Base 5.1 127.2 133.9 95.2 Sta. 95+00 33 La Costa Ave. Base 4.2 127.3 133.9 95.2 Check on 1110 Sta. 87+00 34 Piragua St. Base 3.2 125.5 132.3 95.0 Check on #15 Sta. 30+00 35 Cadencia St. Base 6.0 125.4 132.3 95.0 Sta. 16+30 36 Caden ci a St. Base 7.0 125.3 132.3 95.0 Sta.18+S0 37 Cadencia St. Base 7.2 126.3 132.3 95.6 Sta. 20+50 38 Cadencia St. Base 6.8 118.0 132.3 . 89.2 Reworked Sta. 22+50 39 Cadencia St. Base 4.6 126.0 132.3 95.2 Sta. 24+50 40 Cadencia St. Base 7.6 130.7 133.9 97.6 Sta. 26+50 41 Cadencia St. Base 4.7 127.2 132.3 96.1 Sta. 28+50 42 Cadencia St. Base 5.5 127.2 132.3 96. 1 Sta. 30+50 43 Cadencia St. Base 6.6 130.4 133.9 97.5 Sta .• 32+50 44 Cadencia St. Base 4.5 126.3 132.3 95.4 Sta. 34+50 . 45 Cadencia St. Base 4.7 114.7 132.3 86.8 Reworked Sta. 36+50 46 Cadencia St. Base 6.5 126.3 132.3 95.5 . Sta. 38+50 47 Cadencia St. Base 7.6 125.5 132.3 95.0 Check on #45 Sta. 36+50 48 Retiro St. Base 4.6 125.9 132.3 95.1 Sta. 17+00 BENTON ENGINEERING, INC, .. (I I' ~ Project No. 72-12-50 • -10-•• .January 10, f975 La Costa Vale Unit No.2 TABLE OF TEST RESULTS (CONT .) Maximum Approx-Type of Field Dry Dry Test in'late Material Moisture Density Density 'Percent No. Location Tested % dry wt Ib/cu ft Ib/cu ft Compaction Remarks Tests Taken in Base Material 49 Retiro St. Bas.e "7.7 123.4 132.3 93.4 Reworked Sta. 15+00 50' Retiro St. Base 5.9 118.8 132.3 89.8 Reworked Sta. 13+00 51 Retiro St. Base 6.4 126.8 132.3 95.9 ' Sfa,o 11+00 52 Retiro Sf. Base q.O 127.6 132.3 96.5 Sta. 9+00 53 Valero Ct. Base 6.1 126.5 132.3 95.6 Sta.4+00 54 Valero Ct. Base 7.1 115.7 132.3 87.5 Reworked Sta. 0+00 55 Valero Ct. Base 6.3 125.5 132.3 95.0 Sta. 2+50 56 Cadencia St. Base 6.2 125.6 132.3 95.0 Check on #38 Sta.22+50 57 Retiro St. Base 4.9 127.2 132.3 96.2 Check on #50 Sta. 13+00 58 Valero Ct. Base 7.0 128:3 133.9 95.9 Check on #54 Sta. 0+00 59 Retiro St. Base 6.7 129.0 133.9 96.4 Sta. 7+00 60 Retiro St. Base 6.6 125.9 132.3 95. 1 Sta. 5+00 61 Quinta St. Base 6.0 126.3 132.3 95.4 Sta. 3+00 62 Quinta St. Bose 6.0 127.9 132,.3 96.6 Sta. 1+00 BENTON ENGINEERING, INC. Project No. 72-12-5D • -11-• 'jan,Gary 10, 1975 La Costa Vale Unit No.2 LABORATORY TEST RESULTS The maximum dry densities and optimum moisture contents of the major fill materials as deter- mined by the A.S.T .M. D 1557-70 method, that uses'25 blows of a 10 pound rammer falling' from a height of 18' inches on each of 5 layers in a 4 inch diameter 1/30 cubic foot !=ompactidn cyl inder, are pr~sented as follows: Soil Description Gray brown fine sandy clay Light gray brown clayey fine sand Gray black silty clay light brpWn silty fine sand with c1ay.binder Light yellow brown fine sandy clay Light yellow silty fine sand Greenish brown fine sanely clay Brown clayey fine to medium sand L.ight gray silty clay with yeHow streaks Light gray brown silty fine sand Light yellow silty fine sand Light brown silty fine to medium sand Yellow brown slightly 'silty fine to coarse sand (D.G.Base) Light gray slight,ly silty fine to coarse sand (D.G. Base) BENTON ENGINEERING. INC. Maximum Dry Density Ib/cu ft 110.9 115.2 116.8 118.3 121.6 123.6 118.8 128.0 110.7 114.0 118.2 117.1 132.3 133.9 Optimum Mois-, ture Content % dry wt 14.3 14.7 11".8 11.9 11.5 10.5 12.2 9.2 15. 1 13.5 12..4 12.2 8.3 8. 1 , ~ I "