Loading...
HomeMy WebLinkAboutCT 72-24; LA COSTA SOUTH UNIT 2, 3 AND 4; PRELIMINARY SOILS; 1969-05-22• J' '. • • • • • .' • ·f BENTON ENGINEJ;RING, INC. APPLIED SOIL MECHANICS -F0UNDATIONS 6'741 EL CAJON BOULEVARD el.,IEE •• ," e17d::« l-x //,"/j ,'f ~1 ~ If/? e IIJ:-j, ' PHIL,IP HENKING BENTON PRESIDE!'IT , CIVIL ENGINEER SAN DIEGO. CALIFORNIA 92,115 May 22, 1969 Rancho La Costa, Inc. Route 1, Box 2550 Encinitas, California Subject: Gentlemen: Project No. 69-3-24BC Preliminary Soils Investigation La Costa South Unit Nos. 2, 3, and 4 East of the Intersection of La Costa Avenue and EI Cami'no Real San Diego County, California CONCLUSIONS It is concluded from the field investigation and laboratory test results that: SAN DIEGO, 583-5654 LA MESA, 469-5654 1. The natural s,oils beneath the loose or soft upper soils on the si tes are sui table for the support of the proposed fills and (me or two story residential dwellings. However, expan- sive sandy clay or clay soils may exist near proposed finished grade in certai n areas and specially designed footings and slabs are recommerideq where these expansive soils are allowed to remaj,n in-place at depths within the upper 3 feet be[ow finished grade. 2. I t is concluded from the resul ts of laboratory tests that the firm and very firm natural soils have a safe bearing capacity of at least 1795 pQVnds per square foot for one foot wide continuous footings placed one foot below the firm undisturbed natural ground surface. The , settlement of a one foot wide continuous footing loaded to 1795 pounds per lineal foot and founded " on suitable undisturbed natural soils is estimated to be less than 1/8 inch. , ' , 3. ' The resul Is of the laboratory expansi.on tests' indicate that clay and fi ne sandy clay ,soils, similar to those encountered between 0 . .5 and 2.5 feet in Bori~ 1 and the fine sandy clew fOund between 1.5 and 4.5 feet In Boring 3 would be considered as "expansi,ve" soils. Therefore, in order to avoid the use of specially designed footirgs and slabs, it is recommended that, wherever practicable, the "expansive" clay and sandy clay soHs be removed to a depth of 3 feet below proposed finished grade and be replaced with nonexpansive 50115 uniformly com- pact~d to at least 90 percent of maximum dry d~nsity. In filled ground areas, all "expansive" soils should be placed at least 3 feet below the final compacted fill surface. ' , , , , , • • • • • • Project No. 69-3-24BC Rancho La Costa, Inc. -2-May 22, 1969 If "expansive II soHsare allowed to remai;n in the upper 3 feet below finished grade., then it is recommended that footlrgs and slabs be specially designed. The required special design will be dependent upon the degree of expansion potential of the soli, the thickness of the layer, and the location of the expansive layer with respect to the footirGs or concrete slabs. The lots requirirg specially designed footings and ~Iabs will be listed upon the completion of gradi ng • 4. All of the soils may be .satisfactorily ·compacted In the fill areas and, when com- pacted to at least 90 percent of maximum dry density, have a safe bearing capacity of 2000 pounds per square foot for one foot wide footi~s placed 1 foot below the compacted.ground surface. The settlement of a one foot wide continuous footillJ placed on fill soHs uniformly cOmpacted to 90 percent oimaximum dry density is estimated to be less than 1/8 inch. It is recommended that all soft or. loose soils existing in proposed compacted filled ground areas be removed as required by the soils engineer and the compacted filled ground be placed on firm natural soils. Recommendations for the placement of filled ground are presented in the attached' "Standard Specifications for Placement of Compacted Fille.d Ground," Appendix AA. 5. It is concluded from the test data that the proposed cuts may be safely excavated on ·a· slope ratio of 1 1/2 horizontal tol vertical. The fill soil", when uniformly compacted to atleciSt 90 percent of maximum. dry density In accordance with the approved specifica'tions, wii I be stable for heights up to 70 feet when constructed on a 1 1/2 horizontal to 1 vertical or flatter slope. . The above conclusions assume that suitable erosional control and pro~r drainage will be provided to prevent surface water from running over the top of exposed slopes. • If any soil types are encountered duri~ the grading Qperati~n that were not tested in this invest- igation, additionel laboratory tests will be conducted in order to determine their physical characteristics, and· supplemental reports and recommendations will automatically become a part of the specifications. . • The data presented on the attached pages are a part of this report. Respec tfu" y subm i tted , BENTON ENGINEERING, INC.. (2) Addressee (2) Rick E~ineerrlll Company By .-R. ~ ~ . (1:)' San. Diego Gas & Ele,ctri,c Company Dlstr : • R. C. Remer Attention: Mr. W. K. Wall ~~ (4) County of SanDieq'c;.E~ineering Dept. . ----Attention: Mr. Ray Spencer Revie.~db~ Philip H. enton, ~,ivil Ergineer • • I, , ~ ",II ~ ',\ i . . '\ i~ BENTON ENGINEERING, .tNC. , . i • • • • • • '. • Proieet' ~o. 69::.3-24BC Ra nch'o I:a' Costa, Inc'. -3- DISCUSSION May 22, 1969 A prel,iminary soils in'lestig.ation has been completed on the proposed La' Costa South Uni t Nos. 2, 3 and 4 located adjacent to La Costa Avenue east of ~I Camino Real In San Diego County, CaHfornia. The objectives of the investigation were to determine the exi.ti~ soil conditions and physical properties of the soils in order that el1Jineeri~ recommendations could be presented for the gradf.r~ and development of proposed buildi~ sites for residential type dwellings. In'order to accomplish these oblectives, seven Dori!1)s were drilled with a truck-mounted rotary bucket type drill rig, undisturbed and loose bag samples were obtCllned, and laborCitory tests were performed on these samples. The proposed subdivisions are locah,d on the, south side of the valleyextendi~ easterly from the Batiqultos Lagoon northeast of Encinitas, California. Unit No. 2 is located adjacent to the exlstll1Jgolf course and varies In elevation from approximately 34 feet to 92 feet. Unit Nos. 3 Clnd 4 are located primarily on the higher land alo~ the top of the steep slopil'G hill- sides forming the south rim of the v~lIey. Much of the land for Units No., 3 and No, 4 has been cultivated, The upper soils on the lower slope areas of U ni t No. 2 are described. by the U. S, Department of Agriculture as AI·viso Loam and Huerhuero Fine Sandy Loam. The upper soils on Unit Nos, 3 and 4 are descri~ed primarily as Carlsbad Loamy Fine Sand. The major soli types encountered i,n the exploration bori~s., as clClSsified accordil'lJ to the Unified Soil ClassificCltion Chart·, consisted of si Ity and slightly sil ty sand, clay, sandy clay, clayey sand, and gravelly clayey . sand, Layers of sil·tstone and claystone were also observed in th,e lower portion of the cut slope opposite Lot 191 of Unit No.2. Field Investigation Seven borings were drilled with a truck-mounted rotary bucket-type dri.1I rig at the approximate locations shown on the attached Drawi I'lJ No.1, entitled "location of test Bori~s." The bori~s were drilled to depths of 4 to 22 feet below the existil1J ground surface, A continuous log of the soils encountered in the boril'Gs was recorded at the time of dri II il'lJ and is shown in de.tail on Drawing Nos. 2 to 6, inclusive, each entitled, IISummary Sheet." A log was also recorded of the soils exposed on two cut banks existil1J on Unit No', 2., one opposite Lot 191 and one opposite Lot 194., The log ·of the soi 15 observed on these cut banks is presented on Drawi I1J Nos. 7 and 8. The soils were visually classified by field Identification procedures in accordance with the ·Unl-fied Soil Classification Chart. A simplified description of this classification system is presented In the attached Appendix A at the end of this report. Undisturbed samples were obtai ned at frequent intervals I n the soils ·ahead of 'the dri II ing. The drop weight used for driving the samp!.ll'G tube into the soils wc:iS the IIKelly" bar of the drill rig which weighs 1623 pounds, and the average drop was ·12 inches. The general procedures used in field samplil1J are described under "Samplil'lJ" in Appendix B • BENTON ENGINEERING. INC. • • • • • • • • • • • Project No. 69-3-248C Rancho La Costa'i Inc. LabQratory Tests -4-May 22; 1969 laborc:ttory tesf$ were performed on all undisturbed samples of the soils In order to determine . the dry density and moisture content. The results of these tests are presented on Drawi~ . Nos. 2 to 6, Inclusive . C;onsolldation tests were performed on representative samples in 9rder to determine the load-settlement characteristics of the soils and the results of these tests are presented graphically on Drawing Nos. 9 and 10, each entitled "Consolidation Curves. II . In addition to the above laboratory tests., expansion tests were performed on som, of the· clayey soils encountered to determine their volumetric challle characteristics with change. i.nmoisture content. The recorded expansions of the samples are presented as fol lows: 80ril1J No. 1 1 3 3 Sanple No. 1 2 8ag 1* 8ag 2* Depth of Sanple, in Feet 1.0-1.5 1.5-2.0 2.0-3.0 6.0-7.0 Soil Description Clay FI ne sandy cI ay Fi"ne sandy clay Silty very fi ne to fi ne sClnd with clay bi ndel' Percent Expansi on Under Unit load of 500 Pounds per SquCll'e Foot from Air Dry . to Saturati on . 4.54 4.99 11.34 1.06 . ' * Indicates test sample compacted to 92 percent of maximum dry density. The general procedures used for the precedi~ laboratory tests are described briefly in Appendix 8. Compaction tests were performed on representative samples ,of the soUs to be excavated to establish compaction criteria. The soils were testedaccordil1J to a modified A.S. T.M. 01557- 58T method of compaction which uses 25 blows of a 10 pound hammer droppi~ 18 inches on each of 5 layers in a 4 irich diameter 1/30 cubic foOt mold. The results of the tests are presented as folloWl: Maximum Optimum Mois- 80rt~ 8ag Depth No. Sample ill Feet Soil Dry Density ture Content Oescri pti on Ib/cu ft % dry wt 3 1 2-3 3. 2 6-7 Fi ne sandy clay 117.4, 13. 1 Si·lty very fine to 111.8 1'2.6 fino sand with 6 clay binder 112.3 SI I ty veryfi ne to 13.8 flne sand BENTON ENGINEERING, INC. i i • • . , • •• • • • • • • Project No o69-a~24BC Rancho ~a Costa, Inc 0 -5-May 22, 1969 In order better to classify the finer grained soils, Atterberg Limit tests were performed on . certai n samples in accordance wi.th A.S 0 T oM 0 Designations D 423-61T and D 424-59. The results of these tests and th'e group symbols, for the soils finer than the No. 40 sieve, are presented as follows: Borirg Sample Depth Liquid Plastic Plasticity Group No • No. in Feet Soil Description Limit Limit Index Symbol 1 1 1.0-'1.5 Clay 41.4 13.3 28.1 CL 3 Bag 1 2.0-3.0 Fi ne sandy c I ar 61.9 15.5 46.4 CH DIrect shear tests were performed on saturated and drained samples in order to determine the minimum argle of internal friction and apparfmt cohesion of the various soils. The resul ts of the tests are presented in the followl~ tabulation 0 A~le of Normal Shearing Internal Apparent Load In Resistance Friction Cohesi()n ktps/sq ft kips/sq ft Degrees Ib/sq ft Bortrg 1, Sample 2 0.5 0.74 21 550 Depth: 1 .5-2 .0 feet ·1.0 0.90 2.0 1.66 Boring 5, Sample 2 . 0.5 1.69 31 1200 Depth: 2.0-2.5 feet 1.0 1.81 .2.0 2.78 Bori rg 3, Bag 2* 0.5 0.77 31 460 Depth: 6 .0-7 00 feet 1.0 ·1.05 2.0 1.95 Borirg 6, Bag 1* 0.5 0.60 36 300 Depth: 5 .0-6 .0 feet 1.0 1.07 2.0 1.80 * Indicates tests were performed on samples remolded to 90 percent of maximum dry density BENTON ENGINEERING. INC. • • • • • • • • • • " . . . . < .. ~-~ ~ ; .. Pro,.'dt No. 69.;.3:"24SC R~richo La',COsta, Inc. -6-May 22, 1969 Using the iower values of Internal a~le of fric.tlon and apparent cohesion, and the TerzCGhi Formula for' local shear failure, the safe allowable bearillJ pressures for the soils are det~r" mi.ned· as follows: . Local Shear Formula: Q'd = 2/3 c N'C =y.Of N'q +Y SN'y Assumptions : (1) Continuous footillJ 1 foot wide = 2S (2) Depth of footi I1':J = 1 foot = Of Undisturbed natural soils $= 21 0 ~Ie = 12.5 c = 550 Ib/sq ft N'q =5.6 y = 120 Ib/cu ft N 'y ::;:: 2.2 Q'd = (2/3 x 550 x 12.5 + 120 x 1 x 5.6 + 120 x 0.5 x 2.2) = 5,384 Ib/sq ft Q'd Safe'.= Q'd.-:-3 (Factor of Safety) = 1,795 Ib/sq ft FiU.soils compacted to 90 percent ofmax.imum dry density $ = 310 c = 460 Ib/sq ft y = 113lb/cuft N 'C =19.5 N' == 10 0 'q • N 'y=6.0 Qld = (2/3 x 460 x 19.5 + 113 x 1 x 10.0 + 113 x 0.5 x 6.0) == 7,449 Ib/sq ft Qld Safe = Qld -73 (Factor of Safety) = 2,483 Ib/sq ft BENTON ENGINEERING, INC. • • • • • • • • LII ~ cC Z III 0 .... • ! . LIla: .... LII ::1:'" A. III ... LII ~~ A.~ <::;) LII IIIZ a " SUMMARY SHEET ' '. BORING-NO. . 1 ELEVATIQN 82' 11 >-. )0. " ... • ...... LII' m ~ =; i;;z ": Vz t: Zilla::;) ::;)a:. LII A. ....... )0 ~ v «0 -LII III a: ... ...... LII ' ... III LII ~ ito-a . ::1:111 ...... >. )0 III III i;; III ,j; t: ~~ a:!!!I LII!: a • a a:~ --O~~~~--~~~~~--~----~-=~~~----~--~--~~--~--+-~ ~0/ Brown, Slightly Moist, Loose,. SILTY FINE 1 +-u L \ Topsoil '. SAND ,j ~1J;::. \Red-bro~oist, Firm _ CLAY 9.7 13.9 109.6 2 ~);I\VerY Firm .. ' ...-(M.'rges) / 9.7 10. 1 110.8 ".' .... '.' Brown and Gray, Slightly Moist, FINE SANDY 3 : : : : :r\ Very Firm , CLAY (Merges) / ~ · .... Brown and Gray, Slightly Moist, 4-~ Very Firm CLAYEY FINE ·14.6 10.5 104.3 · ... · ... 5 .'," .~' '!:, Brown and Gray, Slightly Moist, ' ~,:::~,;, Very Firmj 50 to 60 Percent .6 \ Gravel to 3 Inches BORING N.O. .. 2 EloEVATI9H .2061 SAND CLAYEY FINE SANDY GRAVEL o ~Xi: Brown, Sligh tly Moist, Loose, SIL TY 1 ~l~I\ToPSoil . FINE SAND /J--l;...:..6=+--=-5.::.;::.8~97~'~0r-----+_-f ,', _ ~~ 1\ Brown, Moist I L?ose CLA YEY FI NE / ,'" i'i~~;.':~ Light Brown and Light Gray, '\. SAND 2 ..... $~ .. ~ \ Moist, Loose SLIGHTLY SILTY . ''i(~,Y:; ~ , FINE TO MEDIUM 3 -,~:,ZZ:': .--.------SAND -~~3' ~;;.: Very F~rm, Lightly Cemented 4 ~~ , 11.37.9107.2 "37. 1 12.4 112.8 o -Indicates Undisturbed Drive Sample 11 -The elevations presented herein were determined from the contours PROJECT NO. '69-3-24BC shown on the tentative m~p, pr~pared by Rick E~ineeri~ Company . BENTON r I'," , -' !<' • ENGINEERING, INC. DRAWING NO, 2 1 ( • • • • • • • • I • • '. ~ .2 ('II . 8 z ... .-c :J -:E 8 V') .e ~ 0 -' LU ~ 0< Z ca 0 .., ~ LUIIC SUMMARY SHEET .... LU ::cti A.ID BORING'NO. 3. to-LU; ~~ A.u. 0<::) LU "'Z 2121 Q ELEVATION 1 Brown, Slightly Moist, Loose, Topsoil 2 . :::::':::: Gray, Very Moist, Soft ,1 ---.- 3 : 1 ,',,' Moist, Medium Firm 5 6 7 8 9 10 11 12 13 Red-brown, Moist, Firm, 'Contains Clay \ Binder in Some ZoE!!.- Ligh t Brown, Very Fi r~ SILTY FINE SAND FINE SANDY CLAY (Merges) SilTY VERY FINE TO FINE SAND 3.2 24.0 100.0 38.9 11.5 109.0 35.4 10.8 111.0 1 35 A 10.9 no. 9 5-£~~ ____________________ -L ______ ~ __ ~~-J~~--~~~--~ o -Indicates Loose Bag Sdmple PROJECT NO. 69-3-24BC BENTON ENGINEERING" INC.' DRAWING NO. 3 . i , . 1 , ! • • • • • • • • • I. I; ...... o· -N . ! .... . -C ~ -:e ~ R ~ ..9 ~' c( Z IIQ o ..., SUMMARY SHEET BORING' NO. 4 ELEVATION 186' Light Brown, Moist', Very Firm \ ' SILTY FINE SAND SILTY FINE SAND BORING NO. --=5~ ELEVATION 2051 Brown,SUgh,tly Moist, Loose , SILTY FINE ~~~~T_oPLs_o~H ____ --~~~----~~~S~A~N~D~--~ light Brown and light 'Gray I SILTY VERY , Moist l Loose..,--__ FI NE TO FINE ~um Firm _. _' ___ . SAND Firm . Light Brown a~ Light Gray, Moist, Very Firm SILTY VERY FINE SAND PROJECT NO. 69-3-24BC BENTON ENGINEERING, INC. 0.4 10.8 93.0 24.3 12.3 112.1 25.9 11.2 109.8 38.9. 7.9 112.4 0.8 11.8 95.5 6.4 18.2 105 .1 11.3 22.6 102.9 24 3 15. 1 115.4 DRAWING NO, 4 , • • • • • • • • • • '. w ~ < Z c '0 ., :' 3: ",1I:iC .... '" xlii o.c t-", ~~ 0.10&. < :). '" "'Z Q PROJECT NO. 69-3-24BC SUMMARY SHEET BORING' NO. 6 ELEVATION 238' SILTY FINE' SAND SILTY VERY FIN~ TO FINE SAND BENTON ENGINEERING, INC. ). ). C) Ii "'..: ... ..,: ",' ..: iii 10&. vii: '" ....... Q~~ Z . ..:Z . Z '" :) '" 0. ....... ). '" U «0 ~ "''''ae Q ....... "', ... "', '" ii:oQ vi x"' ..... > ..: )io ",-'" iii: ~;e ..: c "'0. 10&. .... '" -Q Q ..:~ 22.7 12.0 109.0 32.4 11.2 106.9 34 . 0 11. 9' 107 . 1 19.4 11.6 108.0 DRAWING NO •. 5 r~ • '. • • • • • • ! • • • ~ .2 N . 8 Z ... . -c ::> -:E ~ Vl .E 8 ~ 0 ..J ~W :e < Z IC o .., ! loll" ... I0Il ::z:lU a..1C t-w :i::i: AoU. <::t loll "'Z Q SUMMARY SHEET BORING' NO. 7 ELEVATION ~ 237' Brown, Sbightly Moist, Loose, Topsoil SILTY FINE SAND FI NE TO ME DIUM .l----!:3~.2~1~7.!.!.. 7-+1~03~i 1+' --,-,--i-'-----i SANDY CLAY 12 .,PROJECT NO. '69-3-24BC BENTON SILTY VERY FINE TO FINE SAND ENGINEERING, INC. 22.7 . 11. 1 102.8 32.4 15.8 112.9 32.4 14.5 109.8 34.0 15.2 106.6 DRAWING NO. 6 • • • •• • .q- I • N .... ·c :::> -:S 8 V) • .2 ~ .9 • • .' iU :e 0< Z &G 0 .... .' ~ iUlI:II: .... iU ::clii Ao&G :e:e .... iU 0<::) Ao"", iU Q "'Z · .. 5-~.~ , .. 6 · .... ~ . . . . -. · ... ~ .... .... • 0', 7 ::~ _ .. -" .. •• •• 8-.. .,. · .... -...... .. -. 9 :: :..;. . .• ·-w- .~ ... 1 , .•. · .. -.. a·", -.•.. ... .-. 11-& ..... w··.· ...... . .-' .... 12 ~:~ •••• ... -,,;,: 1" •..• ' -~~. 1.1 --~ •• ~.: ,--"' .. - 15- 16- -:?-:?: 17-~5(':). 23-~ 2~~ 25-~ ~ SUMMARY SHEET Cut Slope ,Opposite Lot No. 191 La CostQ South Unit No.2 ELEVATION 70 I Brown, Slightly Moist, Loose Light Gray and Light Brown, Moist, Very Firm, Alternatiil1 Layers GRAVELLY CLAYEY FI NE TO , MEDIUM SAND SILTY VERY FINE SAND, SILTSTONE, AND CLAYSTONE' PROJECT NO. 69-3-24BC BENTON ENGINEERING, INC. DRAWING NO. ,7 \ j .. ,. >->-...: SUMMARY SHEET C) Ii Il0l''': .... w' ~ Il0l= . 111: o~~ iii .... ut: Cut $Jope Opposte Lot No. 194 Ilol ;;;-Z III: Z . ..... Il0l Z :;) ~~~. ::J:ti A.CC Ilol A. iilt;>-Ilol u· .... .". ~.~ La Costa South Unit No.2 Ilol ~ --III: Q' ....... ::J:cn-A.'" <:;) "'0 0 >'" "'iii: Ilol cnz ELEVATION SO·' > ...: ~~ III:CC Q iii: Il0l_ '" Q .... ac::.:: 0 • -0 ~ Brown; Moist, Loose, Topsoil SILTY FINE SAND 1 .' .' ... ~ . Gray and Brown, Moist, Firm ...... . .. . , FINE,SANDY ........... _. 2 ., ., . ~ ' .. .... , ..... CLAY • 0° ••••••• ........... 3 "0° • °0 , ........ , Brown, Moist, Very Firm eLA YEY FI NE TO -..... -... 4-0<" .;: ... MEDIUM SAND ..... -.. " ......... , ...... ,. · ...... • 5 · ........ · ... , · ...... 6-· ....... .. ~. .. . . · .... · ...... • 1 ~ . o. Z .. ~E 7 -...... ~ Brown, Moist, Very Firm -I SILTY FINE s-SAND -~ . 9-~ • • l ::> • i: 8 en R ~. 0 -' ... ,; ... " Brown, Moist, Very Firm, 10 -.-. · ...... 40 Percent Gravel to 3 Inches ..•.... -..... ,. and Cobbles to 6 Inches 11-· .. :.;.. ... · ....... ----,--_.-......... Few~Lenses GRAVELLY T •.... ---_. ...... CLA YEY FI NE TO 12 ,..-.. · ....... . , MEDIUM SAND ..•.. • ., T • .- 13-...... ---• '1" ••• ... -Clay Lenses ........ '" .. ' .. 14 ..... ,: ..... I ... •• ... ' -..... 0-" -- • I· ... ·r· 15 .-... ..•.... . ~ .. - I .. •·.•· .. 16-.. '"_00 -.-' 1_·..-1 .. ··._. -· ..... 1_.-:)'" ._ •• _0' 1-··.· ._ .. '.' • Ilol . ~ 22 ,' .•. -.... -.. ~ . _ ..... 1' ...... 4( z .•.. --. 23 ....... ' CC' 0 .., . • PROJECT NO. ENGINEERING, DRAWING NO. 69-3-24BC BENTON INC. a - - • CONSOLIDATION CURVES LOAD IN KIPS PER SQUARE FOOT • 0°·2 0.4 0.6 0.8 1.0 2 4 6 8 10_ . 16 Boring 2 cr------r---,Samp'le 2 t--Der,th '?, • r---t--. r-t--r-c -- 1 1---., ---. ~ r---t--j--.,. t-----I-~ r-r-~ • -~ r--" ~ - 2 en en I&J Z - ~ (.) • :z: I- '¢ I N ·0 • Z ..., ·2 :::> -= 5 c.n 0 Boring 3 1&1 r------..J Sample -Bag #2 Il. I----2 Depth ... 6.5' e( t-en -r--. t--Remoldeq to I----t--I&. 1-_ t--r-90% of Max j,-, 0 r---r----1 r-I mllln Dry Densit I--r-t--~ z ~ 1&1 ~ (.) 0:: I&J -t-~ Il. I'· R ~, u: ..9 I z 2 -. 2 .. l-e( Q ..J 0 en z • 0 (.) • 0 -Boring 4 r--r--r--~ r-Sample 2 r-I:-. ~ Deoth 2,5' ~ !---~ -l-I--r-~ r--_ ~ 1 ~ ~ • I&J 2 2 I '« ~ 0 Indicates percent consol idation at fieldmQlsture CD 0 .., •. Indicates percent consol idati on after satur~ti on • PROJECT NO. DRAWING NO. 69-3-24BC BENTON ENGINEERING., INC. 9 ... , - • CONSOLIDATION CURVES LOAD IN KIPS PER SQUARE FOOT • 0°·2 0.4 0.6 0.8 1.0 2 4 6 8 10 16 'Bori~ 5 ~~ '50mp e 2 -Deoth 2 ,5' .' --t---;---. r-----r----t--t--l-t---~ .1 1---~ ----------~ -. ~ • 2 ---. VI VI 1&1 Z :Ie: (,) • :t: l-e Boring 6 1&1 ..J Sample -Bag # 1 Q. r----2 r---Depth 5.5 1 4 • VI -r-:-' RemGlded to I---r-t--Ll- t--_ t--t-90% of Mdximui 0 r--r--~ Dry Density 1 l-t--t-~ z ----~ IIJ (,) cr: .' r---:::: r---.... 1&1 ~ Q. • I Z 2 9 I-4 9 ..J 0 VI Z 0 (,) • , ' • 1&1 2: 4 Z 0 Indicates percent consol idation at field moisture CD 0 .., • Indicates percent consol idation after saturation .-• PROJECT NO. DRAWING NO. 69 ... 3-24BC BENTON ENGINEERING, INC. 10