Loading...
HomeMy WebLinkAboutCT 72-24; SPANISH VILLAGE UNIT 1 AND 2; GRADING; 1973-05-31• • • • • • • • • ., ,PHILIP HENKING BENTON PRESiDENT. CtVIL ENGINEER La Costa Land Company Costa Del Mar Road Carlsbad, Cal ifornia 92008 Attention: Mr. Irv Roston BENTON ENGINEERING, INC. APPLIED SOil .. MECHANICS -FOUNDATIONS 6717 CONVOY COURT SAN DIEGO, CALIFORNIA 92111 May 31, 1973 , Subject: Project No. 73-3-16BC Gentlemen: Review of Pre I iminary Grading Plan Spanish Village Units 1 and 2 Rancho La Costa Carlsbad, Cal ifornia TEI,EPHONE (714) 565·1955 In ac:cordance with the request made by Mr. Sam Gaines of Rick Engineering in San Diego, California, a review was made of the preliminary grading plem prepared by Rick Engineering of San Diego and dated April 2, 1973 with a revision on May 23, 1973. The preHminarygrad- ing plan shows a total of 129 lots easterly of Borings 4 and 11 described in our report da'ted May 10, 1973. Generally ,the proposed cut and fill slopes shown on the grading plari are feqsible ,from slope stabiLity poirH of view except the proposed 2 horizontal to 1 vertical cut slope southerly of So ~~!.1b.!,.e.r.ge.<;?!,~d~~~,QY~Qllqrl."w.iI Ls_':!tlb.'.2J.!eh.2..p-t~s I~I id~g.~~ in the_tc:e ar~a of.,,!b~.lope. It l~.J.,~~§.~tTJe_C:Rromended:"that-t.bfoLp.tQP"Q'§'~ ,~ut slo~e i~ !?! area be cJian9!S!..~!:S9LltQLta.L.v..eI.tl.cJ;1J_Q!'.it~~ltte r • ;In lieu of this, th~P-tmo~~~~lid~.qEm~t,!llg)!.l?~_Q.Y..eJ:excavg.ted .... to.,Q,"d.ist,ance . .equ.(.v.alent to the ~-o,f-Gu.t-er-9r.e.oter inside th@..P...me.g§ed ... .£il.I"'slg~_s<~,C_e and then re.compacted to a 2 horizontal to ]_v.e.r.tJ&~ql..!!'(lbil ized fill slQpes. Th is area should be carefu J1y ~xamjned Py an engin~ering geologist during .... g(c;d"Tn'9·in C;;der to determine the ·Iateral extent and geometric configuration of the landslided zone. Detailed slope stobilHy analysis based on the geometric configuration of the landsl-ided mass should be performed to determine the 'required thickness of the stabilized fills and the necessity of a shear key for the fill slope. The recommended thickness of overex~avation may have te be adjusted in accordance with the findings of the slope stability analysis. Respectfully submitted, BENTON ENGINEERING, INC. Fsviewed ~,~ Distr: (4) Addressee (1) Attention: Mr. Bob Stork (2) Rick Engineering, San Diego Ath;mtion: Mr. Sam Gaines SHS/PHB/meg