Loading...
HomeMy WebLinkAboutCT 72-25; Alicante Hills Lot 1; Soils Report Final; 1974-06-14PHIUP liENKING BENTON rm=*,m*7 CIVIL LNrlNa.?ll BENTON ENGINEERING, INC. APPLIED SOIL MECHANICS - FOUNDATIONS June 14, 1974 ;tLEPMonE (714) 555.19!3s La Costa Land Company Costa Dal Mar Road Car&bad, California 92008 Subiect: Project No. 72-6-20D RECEIVED Report on Compacted Filled Ground f Alicante Hills Tract No. 72-25 JW 1 7 1974 La Costa Area Carl&d, California CIP/ OF CARLSBAD Building Department Gentlemen: This is to report the results of tests and observations made in order to inspect the compaction of filled ground laced on a portion of Lot 1 of Alicante Hills in Carlsbad, California. The fill was placed d J rrng the period between April 15 and April 22, 1974. The approximate area and depths of filled ground placed under our inspection in accordance with the approved specifications are shown on the attached Drawing No. 1, entitled “Location of Compacted Filled Ground.” The grading plon used for the placement of filled ground was prepared by Rick Engineering Company. The approximate locations at which the tests were taken ore shown on Drawing No. 1 and the final test results are presented on page 3, under the “Table of Test Results.” The laboratory determinations of the maximum dry densi ties and optimum moisture contents of the major fill materials are presented on page 3, under the “Labamtory Test Results. ” Some of the maximum dry densities shown in the “Table of Test Results” were combinations of these. The tests were taken on the dates indicated below: Test Number Date 1 and 2 April 15, 1974 3 April 16, 1974 4 April 17, 1974 5 April 18, 1974 6 April 22, 1974 7 to 10, incfusive May31; 1974 The final results of tests and observations indicate that the compacted filled ground has been placed at 90 percent of the maximum dry density or greater. It has been determined that the fill materials, compacted to 90 percent of the maximum dry density’, have a safe bearing value of 1300 pounds per square foot for one foot wide continuous footings founded at a minimum depth of one foot below the final compacted ground surface and placed five feet or more inside the tap Project No. 72-6-20D La Costa Land Company -2- June 14, 1974 of compacted filled ground slopes within and northerly of the dashed line described as the “limit of approved building area” on Drawing No. 1. Oversized rock fragments and boulders were placed in a designated disposal area at the location shown an Drawing No. 1. Sail has been placed over the rocks; however, the area is not approved for the support of buildings and footings. The compacted filled ground placed on the area for the proposed swimming pool was placed over existing relatively highly compressible natuml alluvial and/or bay mud type rolls. Expansive soils were placed in the upper three feet below final grade in the filled ground areas and expansive natuml sails also exist at depths of less than three feet below final grade in certain shallaw fill and cut areas. Therefore, in order to minimize possible detrimental effects caused by these potentially “expansive” solls, the following special design and precautions are recommended: 1) Use continuous interconnecting reinforced concrete footings throughout, and place these at a minimum depth of two feet below the lowest adiacent exterior final ground surface. 2) 3) Reinforce all interior and exterior footings with at least one 15 steel bar at 3 inches abave the bottam of the footings and one #5 bar placed 1 l/2 inches below the tep of the stems of the footings. Reinforce all concrete slabs on gmde with at least 6 x 6 - lo/10 welded wire fabric. A minimum of 4 inches of 3/4 to 1 inch size crushed rock should be placed beneath all concrete slabs and covered with a moisture barrier. Two inches of clean sand should then be placed over the moisture barrier and below the bottom of the slab. Wherever pmcticable, floor slabs should be sepamted from adjacent footings by a l/2 inch thickness of construction felt or equiva- lent to allow independent movement of the slabs relative ta the footings. 4) Provide positive dminage away from all perimeter footings ta at least 5 feet outside the buildings. Al I buried exterior utility lines should be City of Carl&ad approved plastic lines due to the corrosive chamcteristlcr of the soils, unless sufficient field tests am taken to establish that noncorrosive soils exist in the utility tmnch areas. Respectfully submitted, BENTON ENGINEERING, INC. BY-z&?~~ R. C. Remer Reviewed by (5ii$t43& -.. Philip H. Bentcn, Civil Engin&. Distribution on page three. RCR/PHB/ew BENTON ENGINEERING. TNC. Project No. 72-6-20D La Costa Land Company Test No. Depth of Fill at Test in Feet 1 1.0 2 3.0 3 2.0 4 4.0 5 1.0 6 1.0 7 4.0 8 1.0 9 1.0 10 1.0 -3- June 14, 1974 TABLE OF TEST RESULTS Field DrY Moisture Density % dry wt Ib/cu ft 14.5 105.8 13.5 105.8 19.5 103.1 16.1 109.5 17.7 105.3 13.9 101.3 19.2 106.1 15.4 107.1 16.1 105.2 13.8 109.0 Maximum DV Density Ib/cu ft 117.9 113.4 117.9 117.9 113.4 108.9 116.5 117.0 112.3 119.6 Percent Compaction 90.0 93.4 87.5 93.1 93.0 93.1 91.1 91.5 93.7 91.1 Reworked Check on #3 LABORATORY TEST RESULTS The maximum dry densities ond optimum moisture contents of the malor fill materials as determined by the A.S.T.M. D 1557-70 method, that uses 25 blows of a 10 pound rammer falling from a height of 18 inches on each of 5 layers in a 4 inch diameter l/30 cubic foot compaction cylinder, are presented as follows: Soil Description Yellow brawn silty fine ta medium sand Light brawn silty clay Light olive gmy very fine sandy clay Light gray clay Light olive gmy silty clay Maximum Dry Density Ib/cu ft 117.9 108.9 122.3 110.7 117.0 Distr: La Casta Land Company, Curlsbad (2) Attention: Mr. LesVaughn (1) Attention: Mr. Burton Kramer (2) Rick Engineering Company City of Carl&ad (2) Attention: Building Department Optimum Mais- ture Content 96 dry wt 13.4 15.5 10.7 14.1 13.7 BENTON ENGINEERING. INC. P”lLlP HENKING BENTON l 11KS101)11 ClYlL lHDlHIl” La Costa Land Company Costa Del Mar Rood Carl&d, California 92008 BENTON ENGINEERING. INC. APPLIED SOIL MECHANICS FUVNDATIONS 6717 CONYOY COURT SAN DIEGO. CALIbO”NIA 9iill January 27, 1975 Subject: Project No. 72-6-20D Results of Field Density Tests Taken in Compacted Subbase And Base Materials Alicante Hills Carlsbad Tract No. 72-25 Carlsbod, Colifornio I,IIP.IUNI 17141 865.1856 CITY OF CARLSBAD En&=ing Department Gentlemen: This is to report the results of field density tests taken in compacted subbase and base materials placed In the street areas of Alicante Hills in Clrlsbad, California. -.,_ “,_ _^,,.,.., ,,.. .,. The tests were taken on the dotes indicated below: Test Number Tests Taken in Suhbnse Date 1 and 2 December 27, 1974 3 to 13, inclusive January 2, 1975 14 to 22, inclusive January 3, 1975 23 to 34, inclusive January 6, 1975 Tests Taken in Base Material 1 to 6, inclusive 7 to 27, inclusive 28 to 31, inclusive 32 to 36, inclusive 37 and 38 Januory 16, 1975 January 17, 1975 January 20, 1975 January 21, 1975 January 22, 1975 The opproxlmate locatlans at which the tests were taken and the final test results are presented on pages 3 to 7, inclusive, under the “Table of Test Results. ” The laboratory determinations of the maximum dry densities and optimum moisture contents of the materials are presented on page 8, under the “Loboratory Test Results. ” Project NO. 72-6-20D -2- Jonuary 27, 1975 La Costa Land Company The final results of the tests indicate that the subbase and base moterinls have been compacted to a minimum of 95 percent of maximum dry density. Respectfully submitted, BENTON ENGINEERING, INC. By&?&-&&C& R. C. Remer Reviewed by ( \,s’ +“~J- / , Philip H. Bedton, Civil Engineer Distr: (4) Addressee (I ) Addressee Attention: Mr. Burton L. Kramer (2) City of C&bad Engineering Department (1) Rick brgineering Company, C&bad RCR/PHB/ew BENTON ENGINEERING. INC Project No. 72-6-20D Lo Costa Land Compony Test No. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Approx- Field DV imate Moisture Density Location % dry wt ib/cu ft Alfll Way sta. l+OO Alfil Way sto. 7+00 Al icante Rd. Sto. 36+00 Aliconte Rd. sta. 36+00 Al icante Rd. S to. 38+00 Alicante Rd. sto. 4oHlo Al lcante Rd. stc. 40+00 Aliconte Rd. Sto. 38+00 Alicante Rd. 90. 40+00 Al icante Rd. sta. 42100 Al icante Rd. Sta. 44+00 Alicante Rd. sto. 46+00 Al lcante Rd. Sta. 48+00 Alfil Way Sto. l+oO Alicante Rd. sta. 46MO Alicante Rd. sta. 48+00 Alicante Rd. Sta. 28+X Alicante Rd. sto. 30+00 Aliconte Rd. Sto. 32+00 Aliconte Rd. sto. 34+00 13.0 12.4 17.8. 14.7 16.1 13.2 13.4 15.9 13.6 13.2 12.9 14.9 14.3 11.7 15.1 15.3 16.7 14.5 12.6 13.5 Tests Taken in Subbase 102.1 101.4 103.3 105.8 100.0 104.9 102.6 105.5 105.1 104.8 105.2 101.6 102.1 105.0 104.9 106.1 105.2 105.1 105.4 105.4 -3- Jonuory 27, 1975 TABLE OF TEST RESULTS Maximum DV Density Ib/cu ft 110.2 110.2 110.2 110.2 110.2 110.2 110.2 110.2 110.2 110.2 110.2 110.2 110.2 110.2 110.2 110.2 110.2 110.2 110.2 110.2 SENTON ENGINEERING. INC Percent Compactio,i 92.5 92.0 93.8 95.7 90.7 95.0 92.9 ) 95.7 95.4 95.0 95.5 92.0 92.7 95.2 95.0 96.2 95.5 95.4 95.6 95.6 Remarks Reworked Reworked Reworked Check on #3 Reworked Reworked Check on #5 Check on #7 Reworked Reworked Check on # 1 Check on #12 Check on 813 Project No. 72-6-20D La Costa Land Company -4- Test No. 21 22 23 24 25 26 27 28 29 30 31 32 33 34 Approx- imate Location Alfil Woy 90. 3+00 Alfil Way sto. 5+00 Alfil Way Sta. 5+00 Alffl Way sto. 7+00 Alfil Way sta. 9+uO Alfii Way sta. llto0 Alfil Way sta. 13-H)o Alfil Way sto. 15+00 Alfil Way sto. 17+Oo Alfil Woy sta. 19+00 Alfil Way Sta. 21+50 Condil Way sta. 0+50 Candil Way Sta. 2+50 Alfll Way sto. 15+00 Alicante St, Sto. 29+OO Aliconte St. sta. 31+00 Aliconte St. sta. 33+Oo Alicante St. Sta. 35+00 Aliconte St. sto. 37+00 TABLE OF TEST RESULTS (CONT.) Maximum Field DV DV Moisture Density Density % dry wt lb/cu ft Ib/cu ft Tests Taken in Subbase 10.8 105.1 110.2 13.1 101.4 110.2 10.5 105.1 110.2 11.2 104.7 110.2 9.4 105.4 110.2 9.3 104.9 110.2 12.4 105.6 110.2 12.7 102.4 110.2 10.1 106.4 110.2 12.2 105.1 110.2 9.0 107.0 110.2 13.1 105.2 110.2 10.2 105.1 110.2 9.0 106.4 110.2 Tests Taken in Bose Moterial 8.6 124. 1 130.3 6.5 125.6 130.3 6.6 125.5 130.3 6.1 123.7 130.3 8.5 126.9 130.3 Jonuory 27, 1975 Percent Compaction 95.4 92.0 95.3 95.0 95.6 95.0 95.7 93.0 96.5 95.3 97.0 95.5 95.3 96.6 95.3 94.3 96.4 95.0 97.2 Remorks Reworked Check on x22 Check on #2 Reworked Check on #28 BENTON ENGINEERING. INC. Project No. 72-6-20D La Costa Land Company -5- Test No. 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 Approx- imate Location Aliconte St. sto. 39too Alicante St. sta. 41+00 Al iconte St. sta. 43+00 Alicante St. sto. 45+00 Alicante St. 90. 47+00 Alicante St. sto. 48+10 Aliconte St. sta. 47+QO Alicante St. sta. 48+10 Alfll Way sto. 21+40 Alfil Way sta. 20+50 Alfil Way Sto. 19+25 Alfil Way sta. 17+00 Candll Way Sta. 2+50 Candil Way sta. 0+50 Alfll Woy sta. 15+00 Alfil Way sta. 13400 Alfll Way sta. ll+oo Alfil Way sta. 940 Alfil Way sta. 7*0 Alfil Way sto. 5+00 Alfil Way sta. 3+00 TABLE OF TEST RESULTS (CC+‘:.) Field DV Moisture Density % dry wf Ib,‘cu ft 8.1 123.6 8.9 128.6 7.3 124.1 8.9 126.4 8.7 122.2 6.5 120.8 5.4 130.4 6.3 123.9 4.8 126.1 6.0 127.6 6.5 127.9 6.2 125.7 9.5 124.9 7.0 125.4 8.1 127.1 6.9 126.9 6.5 125.4 8.9 124.1 7.0 126.4 7.0 125.8 8.7 124.4 Maximum DV Density Ib/cu ft 130.3 130.3 130.3 130.3 130.3 130.3 130.3 130.3 130.3 130.3 130.3 130.3 130.3 130.3 130.3 130.3 130.3 130.3 130.3 130.3 130.3 Jonuary 27, 1975 Percent Compaction Remorks 94.9 98.7 95.3 97.1 93.8 Reworked 92.6 Reworked 100.0 Check on #IO 95.1 Check on “11 96.7 97.9 98.1 96.5 95.8 96.4 97.5 97.2 96.3 95.2 97.1 96.5 95.4 BENTON ENGINEERING. INC. Project No. 72-6-20D La Costa Land Company -5- Test NO. 27 . 28 29 30 31 32 33 34 TABLE OF TEST RESULTS (CONT.) January 27, 1975 Approx- Field DV imate Moisture Density Location % dry wt Ib/cu ft Maximum b Density I b/cu ft Percent Compaction demorks Alfil Way 8.9 sta. l+oo Access Rd. 8.7 Bet. Alicante Hills 8 La Costo South I5 sta. 22+Oo Access Rd. 8.1 Bet. Aliconte Hills 8, La Costa South t5 Sto. 24+00 Access Rd. 8.7 Bet. Alicante Hills B La Costa South 85 Sto. 26+00 Access Rd. 8.7 Bet. Aliconte Hills 8 Lo Costa South 15 Sta. 24+00 Access Rd. 8.3 Bet. Aliconte Hills & La Costa South 65 sto. 22too Access Rd. 8.6 Bet. Aliconte Hills 8, La Costa South 85 Sta. 2440 Accerr Rd. 7.5 Bet. Alicontr Hills & La Costa South fi5 Sto. 26+00 Tests Token in Bose Moterial (Cont.) 129.0 130.3 98.9 127.0 130.3 97.5 121.5 130.3 93.2 Reworked 128.5 130.3 98.6 123.8 130.3 95.0 Check on #29 124.5 130.3 95.6 124.0 130.3 95.2 123.8 130.3 95.0 BENTON ENGINEERING. INC. Project No. 72-6-20D La Costa Land Company -7- Test No. Approx- imate Location 35 Access Rd. Bet. Allcante Hills 8 La Costa South 15 Sta. 29+35 36 Access Rd. Bet. Alicante Hills 8, La Costa South 65 Sta. 32+00 37 Access Rd. Bet. Alicante Hills 8 La Costa South 85 sto. 31+90 38 Access Rd. Bet. Alicante Hills B Lo Costa South #5 Sta. 29+65 TABLE OF TEST RESULTS (CONT.) January 27, 1975 Maximum Field Dry DV Moisture Density Demity PercWt % dry wt Ib/cu ft lb/w ft compacr;sn i.rlmc; Tests Taken in Base Material (Cont.) 9.5 128.0 130.3 98.2 8.6 126.4 130.3 97.0 5.1 8.8 124.3 130.3 95.4 126.1 130.3 96.7 BENTON ENGINEERING. INC. Project No. 72-6-201) -8- . .. La Costa Land Company January 27, 1975 LABORATORY TEST RESULTS The maximum dry densities and optimum moisture contents of the materials as determined by the A.S.T.M. D 1557-70 method, that uses 25 blows of a 10 pound rammer falling fwm a height of 18 inches on each of 5 layers In a 4 Inch diameter l/30 cubic foot compaction cylinder, ore presented as fol I aws: Soil Description Yellow brown silty very fine to fine sand Gray brown slightly silty fine to coarse sand (decomposed granl te base) Maximum Optimum Mois- Dry Density two Content Ib/cu ft % dry wt 110.2 13.8’ 130.3 7.8 BENTON ENGINEERING. INC.