HomeMy WebLinkAboutCT 72-03; Tri-City Auto Plaza; Soils Report Interim; 1973-03-12- - - PHlLlP HENKING BENroN PF‘FPlDLNT ClYlL LNGlNLLil BENTON ENGINEERING, INC. APPLIED SOlI. MECHANICS ~~~ FOIINO*TIONS 6717 CDNVOI CC>UHT SAN DILljO CALIFOHIIIA 9211, March 12, 1973 Mr. Howard Hassett c/o Bridge Motor Inn 1103 North Hill Street Oceanside, Colifomio 92054 Subiect: Project No. 72-10-3D Interim Report on Compacted Filled Ground TriCity Atlto And Plaza Del Norte Carlsbad, California CT- 72-3 Dear Mr. Has&t: This is to report the results of tests and observations made in order to inspect the compaction of ftlled ground placed to date on carlain areas of the TriCity Auto Plaza end on the ri ht re- 7 half of Plaza Del Norte between Tri-City Auto Plaza and Palomar Airport Road in Car s ad, California. The fills were placed during the period between October 10, 1972 and February 7,1973. The grading plans used for the placement of filled ground were prepared by Associated Engineers. The approximate locations at which the tests were taken and the final test results are presented on pages 3 ta 9, inclusive, under the ‘Table of Test Results. ” The laboratory determinations of the maximum dry densities and optimum moisture contents of the major fill materials ore presented on page 10, under the “laboratory Test Results. ” Some of the maximum dry densities shown in the ‘7oble of Test Results” were combinations of these. The tests were taken during the weekly periods indicated below: Test Number Week Ending 1 to 45, inclusive October 14, 1972 46 te 66, inclusive October 21, 1972 67 to 110, inclusive October 28, 1972 111 to 136, inclusive November 4, 1972 137to 144, inclusive November 18,+19R 145 to 155, inclusive November 25, 1972 -, - - - - - - - - - Project No. R-10-3D TriClty Auto Plaza -2- Test Number Week Ending 156 ta 172, inclusive 173 to 179, inclusive 180 to 188, inclusive 189 to 194, inclusive 195 to 217, inclusive 218 to 227, inclusive 228 to 241, inclusive 242 to 257, Inclusive 258 to 270, Inclusive December 2, 1972 December 23, 1972 December 30, 1972 January 6, 1973 January 13, 1973 January 20, 1973 January 27, 1973 Februay 3, 1973 February 10, 1973 March 12, 1972 Existing loose or very moist to saturated unsuttable soils were removed as required at certain locations in order to place the compacted filled ground on natuml soils suitable for support of the proposed structures mrd/or filled ground. Compacting of filled ground has not been completed in the following areas: 1. The upper two feet below existing grade on certain portions of Lots 1, 2, and 3. 2. Approximately 1.5 feet of fill in a 50 feet wide strip at the rear of lob8and9. Except in the above described areas and areas where loose soils have been stockpiled in mounds, the final results of tests and observations Indicate that the compacted fllled ground placed on the remaining portions of the site has been placed at 98 percent of the mmrimum dry density or greater. Footings placed on filled ground, uniformly compacted to at least 90 percent of mcmimum dry density, may be designed In accordance with the recommendations presented in our reports on Project No. 72+21A, doted September 8, 1972 and October 16, 1972. If footings are placed closer to the exposed slepes than 5 lest inside the top of compacted filled ground slopes, these should be deepened one foot below a 1 l/2 horizontal to 1 vertical line projected outward and downward from a point 5 feet horlrontally inside the top of compacted filled ground slopes. A plan showing the approximate areas and depths of filled ground placed under our inspection In accordance with the approved specifications will be submitted with our final report on this prolect. Respectfully submltted, BENTON ENGINEERING, INC. ByML?&tee . C. Remer Distr: (5) Addressee (1) Pusociated Engineen RCR/PHB/prw BENTQN ENGlNEERING. INC. ,- - - - - - - -~ - - - Project No. 72-lo-3D Tri-City Auto Plaza Test No. Approx- imate Location Lot No. Depth of Fill at Test in Feet Field DV DV Moisture Density Density %drywt Ib/cu ft Ib/cu ft Percent Compaction Remarks 1 10 2.0 6.8 117.0 125.5 93.1 2 10 2.0 6.3 118.3 125.5 94.2' 3 16 2.0 7.9 121.0 125.5 96.4 4 10 2.0 6.2 116.3 128.6 90.5 5 10 2.0 9.4 123.2 129.4 95.2 6 10 2.0 9.5 122.9 129.4 94.8 7 10 2.0 8.8 122.9 129.4 94.8 8 10 2.0 8.3 124.6 129.4 96.2 9 10 2.0 7.6 117.3 128.6 91.2 10 10 2.0 9.5 131.0 132.6 99.6 11 10 2.0 7.7 120.2 127.2 94.4 12 10 2.0 7.8 118.8 125.5 94.6 13 10 1.0 5.6 109.0 120.8 90.3 14 10 1.0 6.0 116.8 125.5 93.0 15 3 2.0 8.7 118.1 127.2 92.8 16 3 2.0 5.2 110.1 120.8 91.2 17 3 2.0 7.7 118.5 127.2 93.0 18 2 2.0 9.3 125.1 129.4 96.7 19 2 2.0 9.6 123.2 125.1 98.5 20 2 2.0 8.2 124.6 125.1 99.5 21 2 2.0 9.6 123.0 125.1 98.4 22 1 2.0 8.9 123.0 132.6 92.7 23 1 2.0 8.9 122.1 132.6 92.1 24 3 2.0 7.3 126.0 132.6 95.0 25 3 2.0 6.3 117.0 125.5 93.2 26 2 2.0 7.1 123.5 129.4 95.4 27 2 2.0 5.9 125.3 132.6 94.5 28 2 2.0 6.6 121.0 129.4 93.5 29 1 2.0 6.6 115.0 125.5 91.5 30 1 2.0 9.2 123.9 132.6 93.4 31 2 2.0 7.1 122.4 132.6 92.3 32 2 2.0 7.9 122.1 132.6 92.0 33 2 2.0 6.0. 120.8 128.6 93.8 34 1 2.0 6.1 121.4 128.6 94.4 35 1 2.0 7.3 121.5 128.6 94.5 36 1 1.0 7.4 122.1 128.6 95.0 37 2 2.0 6.0 120.0 127.2 94.3 38 2 2.0 6.8 120.0 129.4 92.5 39 2 2.0 7.3 120.3 129.4 93.0 40 2 2.0 8.0 119.0 128.3 92.7 -3- March 12, 1973 TABLE OF TEST RESULTS BENTON ENGINEERING. INC. - - - - -. - - - - - - Proiect No. 72-lo-3D Tri-City Auto Plaza Test No. Approx- imate Location Lot No. Depth of Fill at Test InFeet Field Moisture %drywt DV Density Ib/cu ft Maximum b Density Ib/cu ft Percent Compaction Remarks 41 2 4.0 7.6 120.0 127.2 94.4 42 2 4.0 6.7 122.3 129.4 94.5 43 2 4.0 6.7 116.2 124.7 93.2 44 2 4.0 9.6 117.6 128.6 91.4 45 2 4.0 7.1 121.0 128.6 94.0 46 2 4.0 7.2 124.5 132.6 93.9 47 2 4.0 8.5 126.0 132.6 95.0 48 1 4.0 8.1 123.1 132.6 92.9 49 1 4.0 7.2 123.6 132.6 93.1 50 2 4.0 8.1 123.0 132.6 92.6 51 2 2.0 6.6 119.0 127.2 93.5 52 2 2.0 7.5 125.9 132.6 94.8 53 2 2.0 7.0 120.5 127.2 94.7 54 1 2.0 7.2 130.0 132.6 98.0 55 1 2.0 7.9 127.5 132.6 96.1 56 2 2.0 9.3 124.0 132.6 93.4 57 2 2.0 9.8 121.5 132.6 91.5 58 2 2.0 9.0 118.2 127.2 92.9 59 2 2.0 9.1 117.8 127.2 92.4 60 2 2.0 8.2 123.1 132.6 92.8 61 10 2.0 7.8 124.3 132.6 93.7 62 10 c2.0 8.7 126.0 132.6 94.8 63 10 2.0 8.5 121.6 128.6 94.5 64 10 2.0 8.5 123.9 132.6 93.4 65 10 4.0 7.8 125.2 132.6 94.5 66 10 2.0 8.2 120.8 128.6 93.9 67 2 2.0 6.5 119.8 128.6 93.0 68 2 2.0 6.3 120.6 128.6 93.8 69 3 2.0 7.2 120.4 128.6 93.6 70 3 2.0 7.4 119.5 128.6 93.0 71 2 2.0 8.0 120.5 128.6 93.6 72 3 2.0 7.1 116.0 125.5 92.4 73 2 2.0 6.3 119.1 125.5 94.9 74 10 2.0 6.8 116.1 125.5 92.5 75 10 2.0 10.6 118.8 126.7 93.7 76 10 4.0 6.9 117.2 125.5 93.5 77 10 4.0 6.7 122.9 129.4 94.8 78 10 4.0 7.0 121.2 129.4 93.6 79 10 6.0 6.2 117.0 125.5 93.0 80 10 6.0 8.4 126.0 132.6 95.0 -4- March 12, 1973 TABLE OF TEST RESULTS(CONT.) BENTON ENGINEERING. INC. - - - - - - - - - Project No. 72-103D Tri-City Auto Plaza -5- Test No. 81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 100 101 102 103 104 105 106 107 108 109 110 111 112 113 114 115 116 117 118 119 120 Approx- Depth imate of Fill Location at Test Lot No. in Feet 2 2 3 3 3 3 3 3 3 2 3 3 2 3 2 2 1 2 2 1 1 1 1 1 1 2 2 2 2 2 4.0 4.0 4.0 2.0 2.0 2.0 4.0 4.0 4.0 4.0 2.0 4.0 4.0 4.0 3.0 3.0 3.0 4.0 4.0 3.0 4.0 3.0 3.0 3.0 4.0 4.0 4.0 4.0 4.0 4.0 TABLE OF TEST RESULTS(CONT.) 10 - Bldg. "A" 7.0 10 - Bldg. "A" 6.0 10 - Bldg. "A" 6.0 10 - Bldg. "B" 10 - Bldg. "B" ;.; . 10 - Bldg. "B" 2.0 10 - Bldg. "C" 2.0 10 - Bldg. "C" 2.0 10 - Bldg. "C" 2.0 10 - Bldg. "D" 3.0 Field DV DV Moisture Density Density %drywt Ib/cu ft Ib/cu ft Rrcent Compaction Remarks 8.0 119.0 128.6 92.4 8.2 119.0 128.6 92.4 7.5 120.0 128.6 93.2 6.4 119.0 128.6 92.4 8.4 117.3 128.6 91.3 8.3 117.0 127.2 91.8 7.8 121.6 127.2 95.5 7.8 118.0 127.2 92.5 7.2 116.0 125.5 92.4 7.9 120.3 127.2 94.5 10.0 129.8 132.6 97.8 9.7 124.7 132.6 94.0 7.5 119.8 128.6 93.0 6.9 121.0 128.6 93.9 9.2 128.5 132.6 96.8 8.2 124.6 132.6 94.0 9.7 128.5 132.6 96.8 9.9 124.1 126.7 98.0 12.7 118.2 127.0 93.0 10.5 128.0 129.8 98.6 8.9 129.0 132.6 97.3 6.7 119.5 128.6 93.0 7.6 119.0 129.4 92.0 8.3 119.0 129.4 92.0 7.9 127.9 128.6 99.4 8.5 121.0 128.6 94.0 9.8 125.5 127.0 98.8 7.6 123.0 128.6 95.5 6.6 120.3 128.6 93.5 9.7 122.8 127.0 96.6 5.0 117.9 128.6 91.5 5.0 118.3 128.6 92.0 6.8 122.0 128.6 94.8 6.2 118.8 125.2 94.8 5.5 118.4 12502 94.5 7.5 129.1 132.6 97.5 6.3 123.0 128.6 95.7 5.7 115.4 123.2 93.5 5.2 119.2 128.6 92.6 6.1 125.1 132.6 94.5 March 12, 1973 Finished Grade Finished Grade Finished Grade Finished Grade Finished Grade Finished Grade Finished Grade Finished Grade Finished Grade FInished Grade BENTON ENOINEERING. INC. -~ - - - - - - - - - Project No. 72-10-30 Tri-City Auto Plaza -6- Test No. 121 122 123 124 125 126 127 128 129 130 131 132 133 134 135 136 137 138 139 140 141 142 143 144 145 146 147 148 149 150 151 152 153 154 155 156 157 158 159 160 Approx- DsPth lmate of Fill Location at Test Lot No. in Feet 10 2.0 10 2.0 10 2.0 2 4.0 2 4.0 2 4.0 2 4.0 2 4.0 3 2.0 3 2.0 3 6.0 3 4.0 3 2.0 Sta.30+90* 1.0 Sta. 30+85 3.0 Sta. 30 +90 5.0 TABLE OF TEST RESULTS(CONT.) 4.0 4.0 4.0 4.0 4.0 6.0 6.0 6.0 6.0 6.0 6.0 6.0 2.0 2.0 2.0 4.0 4.0 1.0 1.0 2.0 2.0 2.0 Field DV Moisture Density % drywt Ib/cu ft Maximum DV Density Ib/cu ft Percent Compaction Remarks 9.3 127.5 132.6 96.2 Finished Grade 8.3 127.2 132.6 96.0 Finished Grade 8.6 125.6 132.6 94.7 Finished Grade 6.7 119.8 128.6 93.0 8.2 121.9 128.6 94.6 5.5 119.3 125.5 95.0 8.4 115.0 125.5 91.5 8.2 120.0 128.6 93.3 8.2 123.0 128.6 95.6 8.1 120.9 128.6 93.9 6.8 117.2 125.5 93.5 4.8 116.8 125.5 92.9 8.2 121.2 128.6 94.2 6.4 122.0 128.6 94.9 6.4 121.2 128.6 94.2 6.1 122.7 128.6 95.4 6.4 122.5 128.6 95.1 7.9 119.1 128.6 92.6 5.7 123.2 128.6 95.8 9.8 120.0 128.6 93.3 10.3 118.6 128.6 92.2 6.9 121.0 124.7 97.0 8.5 118.0 124.7 94.5 9.9 118.6 128.6 92.2 7.9 126.1 128.6 98.1 8.7 123.3 128.6 96.0 5.9 115.7 124.7 92.7 7.9 126.1 128.6 98.0 7.0 118.1 127.0 93.0 10.8 115.2 127.0 90.8 7.3 116.8 120.8 96.6 7.5 115.7 120.8 95.8 7.4 123.1 128.6 95.7 11.0 119.0 128.6 92.5 7.3 121.3 128.6 94.4 6.2 113.6 124.7 91.2 8.8 123.7 128.6 96.2 7.9 126.3 128.6 98.3 8.9 122.9 128.6 95.7 9.2 121.4 129.4 93.9 * lndlcates Stationing on Plaza Del Norte March 12, 1973 BENTON ENGINEERING. INC - -. - - -. - - - - - - - Project No. R-10-3D TriCity Auto Plaza -7- Test No. 161 I62 163 164 165 166 167 168 169 170 171 172 173 174 175 176 177 178 179 180 181 182 183 184 185 186 187 188 189 190 191 192 193 194 195 1% 197 198 199 200 Approx- Depth imate of Fill Location ot Test Lot No. In Feet 1 3.0 10 -Bldg. "D" 6.0 10 -Bldg. "D" 6.0 10 10 9 10 10 10 10 10 IO 2 2 9 9 9 9 9 9 9 9 5 5 5 10 10 10 10 10 10 Sta16+00 Sta 17+ II0 Sta18+00 Sta 12+ 10 Sta 13 + 10 Sta 14+ IO Sta 15 + 00 : 6.0 Z 2.0 2.0 2.0 2.0 2.0 2.0 2.0 4.0 4.0 4.0 4.0 2.0 2.0 2.0 2.0 2.0 1.5 1.0 1.0 2.0 4.0 6.0 7.0 7,o 3.0 2.0 2.0 2.0 2.0 isi 210 Z TABLE OF TEST RESULTS (CONT.) Field DV Moisture Density % dry wi Ib/cu R Maximum DV Density Ib/cu ft Percent Compact ion Remarks 9.3 113.3 125.5 90.5 8.2 127.8 129.4 98.6 8.3 121.0 123.1 98.3 5.9 122.0 129,4 94.2 9.7 126.0 129.4 97.3 8.8 125.0 129.4 96.4 7.8 123.8 129.4 95.5 7.3 121.3 125.5 96.5 8.1 121.1 125.5 96.5 6.5 117.2 125.5 93.3 702 121.8 125.5 97.0 7.8 123.1 125.5 98.0 8.4 128.8 132.6 97.1 8.0 128.1 132.6 96.6 9.7 127.9 132.6 96.5 11.0 125.8 132.6 94.8 9.5 126.8 132.6 95.6 7.9 116.2 120.8 96.3 8.5 115.4 120.8 95.5 6.3 119.2 125.5 94.9 6.2 120.4 125.5 96.0 6.4 120.0 125.5 95.6 8.1 ill.3 120-8 92.2 8.1 113.0 120.8 93.6 7.9 114.8 120.8 95.0 7.7 123.1 129.4 95.2 7.8 122.2 129.4 94.4 7.9 118.8 125.5 94.6 800 116.3 120.8 96.4 8.1 116.8 120.8 96.8 9.2 114.2 120.8 94.5 8.8 115.1 120.8 95.4 8.9 113.8 120.8 94.3 8.6 114.9 120.8 95.2 7.8 114.7 120.8 95.1 10.2 111.1 120.8 92.0 7.6 115.9 120.8 96.0 8.6 112.2 120.8 93.0 8.7 130.1 132.6 98.2 8.7 129.1 132.6 97.4 March 12, 1973 Finished Grade Flnished Grade Finished Grade Finished Grade Finished Grade Finished Grade Finished Grade Finished Grade Finished Grade Finished Grade Finished Grade Finished Grade Finlshed Grade Finished Grade Finished Grade Finished Grade Finished Grade Finished Grade Finished Grade BENTON ENaNEERING. INC. - - - - - - - - - - - - - P+sctNo.R-10-3D TriCity Auto Plaza Test No. 201 202 203 204 205 206 207 208 209 210 211 212 213 214 215 216 217 218 219 220 i-z 223 224 225 226 227 228 229 230 231 232 233 234 235 236 237 238 239 240 Appmx- Depth lmate of Fill Locotlon at Test lot No. in Feet 3 3 sto 12 + 50 Sta13+50 Sta 14+ 50 Sta15+50 Sta 16+ 50 Sta 17+50 Sta 18 + 30 Sta 19+00 sto 7+50 Sta 8 + 50 Sta 9+50 Sta lo+50 Sta 11 +50 Sta 5+50 Sta 6+50 Sta 9+00 St0 lO+ 00 Sta li+OO Sta 9+W St0 lO+ 00 Sta 9+00 Sta 20+ 00 Sta21+00 Sta 22 + CO Sta 24+ 00 7 7 7 7 7 7 7 7 7 3 3 2.0 2.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 1.0 2.0 2.0 2.0 2.0 2.0 2.0 ::: 4.0 4.0 6.0 5.0 8.0 1.0 1.0 1.0 1.0 2.0 2.0 2.0 2.0 4.0 4.0 4.0 5.0 5.0 6.0 6.0 6.0 6.0 -8- March 12, 1973 TABLE OFlESTfESULTS (CONT.) Field Dry Moisture Density %drywt Ib/cu ft 8.5 8.8 10.7 9.9 10.5 11.3 8.9 8.1 8.2 8.2 8.3 10.0 9.5 9.6 10.5 9.8 9.9 8.6 9.8 8.8 10.9 8.8 8.8 10.7 8.1 7.6 7.9 7.1 8.0 10.1 9.2 9.6 10.3 11.0 11.1 11.2 10.8 10.3 1X 130.7~. 132.6 98.5 128.6 132.6 97.0 116.8 128.6 90.7 116.1 128.6 90.2 116.1 128.6 90.2 122.2 132.6 92.2 126.1 132.6 95.0 124.0 132.6 93.5 124.9 132.6 94.2 124.4 132.6 93.9 124.0 132.6 93.5 127.8 132.6 96.4 124.8 132.6 94.1 126.2 132.6 95.3 126.9 132.6 95.6 124.4 132.6 93.9 122.1 132.6 92.1 127.8 132.6 96.5 123.8 132.6 93.4 120.8 132.6 91.2 126.6 132.6 95.5 128.0 132.6 96.5 125.4 132.6 94.6 119.2 132.6 90.0 123.3 132.6 93.1 123.6 132.6 93.2 124.3 132.6 93.8 129.2 132.6 97.5 126.1 132.6 95.1 121.9 132.6 91.9 123.1 132.6 92.9 117.2 125.5 93.5 115.4 125.5 92.1 115.9 125.5 92.4 114.8 125.5 91.4 115:1 125.5 91.6 116.6 125.5 92.8 120.0 127.2 94.3 120.2 127.2 94.5 120.8 129.4 93.1 Maximum Dry Density Ib/'cu ft Percent Compaction Remarks BENTON ENGINEERING. INC - .- - - - - - - - - - - - Pro/ect No. R-10-3D TrlClty Auto Plaza Approx- imate Test Locatlon No. Lot No. 241 1 iii Sta Sta 42 43 + + 50 50 244 Sta 44+ 50 245 Sta 45+50 246 Sta46+50 247 Sta 47+ 50 248 Sta31 +50 249 Sta 32 +50 250 Sta33 +50 z Sta 34+50 Sta 35 + 50 253 Sta 36 + 00 E Sta37+00 Sta 38 +oO 256 Sta 39+ 00 257 Sta 40 + 00 258 Sta 41 + 00 259 Sta 47+ 50 260 Sta 48 +50 261 sto 49+ 50 262 Sta 50+50 263 Sta52+00 264 Sta 53 + 50 265 Sta 55 + 00 266 Sta 56 + 50 267 Sta58 + 00 268 Sta 32 + 00 269 Sta 33 + 00 270 Sta 34 + 00 271 3 272 2 273 2 274 1 275 2 276 3 277 2 Depth of Fill at Test InFeet 0.0 1.5 1'*: l:o 1.0 1.5 1.0 :-ii 1:o 1.0 2.5 ::i 1.5 1.0 2.0 1.0 1.0 1.5 1.0 1.8 1.5 1.5 2.5 2.5 3.0 3.0 3.0 8.0 8.0 6.0 6.0 6.0 8.0 6.0 -9- TABLE OFTESTRESULTS(CONT.) Field DV Molsture Den&y % dry wt Ib/cu ft Maximum b Denslty Ib/cu ft Percent Compatlon Remarks 10.4 120.8 129.4 93.2 10.8 124.1 127.2 97.5 10.4 125.2 127.2 98.4 10.6 124.8 127.2 98.0 10.8 123.4 127.2 97.0 10.9 125.4 127.2 98.5 7.1 127.2 127.2 100.0 8.8 123.1 127.2 96.6 8.1 124.1 127.2 97.4 8.6 124.2 127.2 97.5 9.4 118.8 125.5 94.6 9.2 123.8 129.4 95.6 8.9 123.8 129.4 95.6 9.1 124.8 129.4 96.3 8.5 120.2 125.5 95.7 8.6 121.5 125.5 96.9 9.1 119.6 125.5 95.3 9.3 122.2 125.5 97.5 10.3 121.5 125.5 96.9 9.9 121.8 125.5 97.0 9.5 121.8 125.5 97.0 9.7 121.1 125.5 96.5 9.6 120.2 125.5 95.7 8.9 126.2 129.4 97.5 8.8 124.8 129.4 96.4 9.7 124.1 129.4 95.9 8.2 123.1 129.4 95.2 10.1 123.5 129.4 95.4 9.7 122.4 125.5 97.5 9.2 124.7 129.4 96.3 11.1 121.9 128.6 94.9 11.9 118.9 128.6 92.5 11.9 117.9 128.6 91.7 11.4 117.3 128.6 91.2 10.9 119.7 128.6 93.1 11.7 116.2 128.6 90.5 11.6 117.7 128.6 91.5 March 12, 1973 Revised March 23, 1973 Finished Grade Finished Grade Finlshed Grade Flnlshed Grade Flnlshed Grade Finished Grade Finlshed Grade Flnlshed Graie Finished Grade Finished Grade Finished Grade Flnlshed Grade Finished Grade Finished Grade Finished Grade Finished Grade Flnfshed Grate Flnlshed Grade Finished Grade Finished Grade Finished Gmde Finished Grade Finished Gmde Finished Gmde Finished Grade Finished Grade BENTON ENGlNEERING. INC. Project No. R-10-3D TrlClty Auto Plaza -lO- March 12, 1973 LABORATORY TEST RESULTS The maximum dry densities and optimum molsture contents of the major fill materials cs determined by the A.S.T.M. D 1557-66T method, thot uses 25 blows of a 10 pound mmmer falling from a height of 18 inches on each of 5 layen in a 4 Inch diameter l/30 cubic foot compaction cylinder, are presented as follows: Soil Description Maximum Optimum Mois- Dry Density ture Content Ib/cu ft %drywt - Dark brown silty fine to medium sand 129.4 8.4 Redknown clayey fine to medium sand 127.2 10.8 Brown silty fine to medium sand 125.5 9.2 Brown silty fine to medium sand 132.6 7.8 Brewn slightly silty flne to medium sand 127.0 8.5 Brown slightly silty fine to medium sand 128.6 8.8 - Light brown slightly silty fine to medium sand 120.8 9.0 BENTON ENGINEERING. INC. - - - - - - - - - - - - BENTON ENGINEERING, INC. APPLIED SOlL MECHANICS --. FOUNOATIONJ 5717 CONVOY COURT *AN DIEGO. CALIFORNIA 82,11 PHILIP HENKING BENTON PREOIDEIIT ClWL ENc3,HEEl Mr. Howard Hassett c/o Bridge Motor Inn 1103 North Hill Street Oceanside, California 92054 April 4, 1973 TELEPHD”E i-7,41 565~lslli5 Subject: Project No. 72-lo-3D Finol Report on Compacted Filled Ground Tri-City Auto Plaza And Plaza Del idorte Corlsbad, California Dear Mr. Hassett: This is to report the results of tests and observations made in order to inspect the compaction of filled ground placed on certain areas of the Trl-City Auto Plaza and on the right holf of Plaza Del Norte between Tri-City Auto Plaza and Palomar Airport Rood in Carlsbad, Calif- ornia. The fills were placed during the period between October 10, 1972 and March 19, 1973. The approximate areas ond depths of filled ground placed under our inspection in accordance with the approved specifications are shown on the attached Drawing No. 1, entitled “Loca- tion of Compacted Filled Ground.” The grading plon used for the placement of filled ground was prepared by Associated Engineers. The final results of Test Ph. 1 to 270, inclusive, were presented in our report dated March 12, 1972. The results of tests takan during the final site grading, Numbers 271 to 277, inclusive, taken on March 19, 1973, are presented on the attached page 9 of the “Table of Test Resulk,” revised March 23, 1973. The approximate locations at which the tesk were taken on the Tri-City Auto Plaza site are shown on Drawing No. 1. Tests taken on Plaza Del Norte, south of Tri-City Auto Plaza, are located according to street stationing. The labora- tory determinations of the maximum dry densities and optimum moisture contents of the major fill materials are presented on page 10 under the “Laboratory Test Resulk.” Some of the maxi- mum dry densities shown in the “Table of Test Results” were combinations of these. Existing loose or very moist to saturated soils were removed as required at certain locations in order to place the compacted filled ground on natuml soils suitoble for support of the proposed structures and/or filled ground. It should be noted that some loose soils have been stockpiled in mounds above the original ground surface on portions of Lots 6 and 7. - - - - - - - Project No. 72-1 O-3D Tri-City Auto Plaza Carlsbad, California -2- April4, 1973 The final results of tests and observations indicate that the compacted filled ground within the approved shaded areas shown on Drawing No. 1 has been placed at 90 percent of the maximum dry density or greater. Footings placed on filled ground, uniformly compacted to at least 90 percent of maximum dry density, may be designed in accordance with the recom- mendations presented in our reports on Prefect No. 72-8-21A, dated September 8, 1972 and October 16, 1972. If footings clre placed closer to the exposed slopes than 5 feet inside the top of compacted filled ground slopes, these should be deepened one foot below o 1 l/2 hori- zontal to 1 vertical line projected outward and downward from CI point 5 feet horizontally in- side the top of compacted filled ground slopes. Respectfully submitted, BENTON ENGINEERING, INC. Reviewed Distr: (5) Addressee (1) Associated Engineers (1) Fiest, Vetter, Knouf ond Loy Attention: Mr. R. Knouf