HomeMy WebLinkAboutCT 73-18; Rancho Del Ponderosa Unit 1 Lots 1-63; Soils Report; 1976-02-13WOODWARD-CLYDE CONSULTANTS CONSULTING ENGINEERS. GEOLOGISTS AND ENVIRONMEN ‘AL SCIENTISTS WESTERN REGION 3467 Kuttz Street February 13, 1976 San DIego Project No. 72-253 California92110 Phone (714) 224-2911 Ponderosa Homes 2082 Business Center Drive, Suite 100 Irvine, California 92664 San LlG&,, c,j;r', Attention: Mr. Terry Teeple FINAL REPORT OF ENGINEERING OBSERVATION AND COMPACTION TESTING RANCH0 DEL PONDEROSA UNIT NO. 1 AND OFFSITE FILLS (CARLSBAD TRACT 73-18) LOTS 1 THROUGH 63 CARLSBAD, CALIFORNIA In accordance with your request and our agreement dated October 24, 1975, we have provided soil engineering services in conjunction with the grading of the subject site. These services included: (1) Engineering observation of the grading operation. (2) Observation of the removal of loose surface and alluvial soil where encountered prior to placing fill. (3) Observation of the removal of potentially expansive soil from rough lot grade where encountered and replacing it with nonexpansive soil. (4) Taking field density tests in the fill placed and compacted. (5) Performing laboratory tests on representative samples of the material used for fill. (6) Periodic engineering and geologic inspections of the cut slope areas. General Site Grading - Site preparation, compaction, and testing were done between November 12, 1975 and January 27, 1976 in accordance with the "Specifications for Controlled Fill" in the Woodward-Gizienski & Associates report entitled "Ranch0 De1 Ponderosa Development (Weigand Property) San Diego County, California", dated September 13, 1973. Ponderosa Homes Project No. 72-253 FebYuary 13, 1976 Page 2 Fill was placed, compacted and tested on Lots 4 throu<h 53. The grading operation essentially consisted of excavating and compacting loose surface and alluvial soils where encountered, undercutting expansive soil encountered at finish grade and replacing it with compacted nonexpansive fill, and making design cuts and fills in accordance with grading plans. This included the placing of fills adjacent to the site in the area of Unit 2 and Constructing a large fill in a canyon area in future Unit 3. As the site grading progressed, the compaction procedures were observed, and field density tests were made to determine the relative compaction of the fill in place. Field observations and field density test results indicate that the fill has been compacted to 90% or more of maximum laboratory density. The approximate locations of field densi,ty tests and the limits of compacted fill have been recorded on a copy of the grading plan for reference. The results of field density tests and of relative compaction, expressed as a percent of maximum laboratory density, are given on the attached forms. Laboratory tests to determine moisture-density relationships, maximum dry density, optimum moisture content, grain size distribution, plasticity characteristics, and strength characteristics were performed on representative samples of the material used for fill. The results of laboratory tests are given on the attached forms. The following lots are fill lots either as a result of design fills as a result of undercutting at finish grade: Lots 4 through 15 an 17 through 53. Q The following lots are cut lots at the end of the grading period: Lots 1, 2, 3 and 54 through 63. Lot 16 is a cut-fill lot. Special Finish Grade Treatment During the grading operation certain lots were specially treated to provide a specified depth of selected soil at rough grade. laboratory tests and visual inspection indicate that nonexpansive fill was placed within 3 feet of rough grade on all fill lots and on the fill portion of the cut-fill lot noted herein. On Lots 4 through 7, 9 through 15, the cut portion of 16, 20 through 26, 36,37 and 38 potentially expansive soil was excavated and replaced with nonexpansive fill to a depth of 2 feet below rough lot grade and within the limits of the entire level lot. WflllllW~RD.CLVl)C CONSMVANTS Ponderosa Homes Project No. 72-253 - February 13, 1976 Page 3 Rough lot grade is defined as that grade set in the field by the grade checker from reference stakes established by the surveyor and represents rough grade at the time we were inspecting the removal and replacement of, expansive soils. Likewise the depths of undercutting of expansive soil and/or depths of placement of nonexpansive soil were in accordance with measurements made by and grades set by the contractor's grade checker. A visual inspection of cut Lots 1, 2, 3, and 54 through 63 at completion of grading indicate that potentially expansive soil is not evident at rough grade surface. Geologic Inspections Geologic inspections were made of the cut slopes on site during the . grading period. The purpose of these inspections was to determine whether any adverse geologic conditions are apparent in the slope. The cut slope bordering Olivenhain Road was examined on November 17, 1975 by an engineering geologist of our firm. This inspection revealed that the slope is a combination cut-fill slope with an approximate 2 to 1 (horizontal to vertical) inclination and approximately 30 feet high at the maximum point. The cut portion of the slope IS composed of interbeddea greenish- grey claystone and siltstone with some sandstone similar to materials found in Tertiary sediments common to the area. The orientation of the strata in the slope was essentially horizontal and jointing and fracturing were not intense. No clay seams or groundwater was noted in the slope. There were no apparent geologic conditions exposed in the slope that are considered, in our opinion, adverse to the relative stability of the slope. The cut-fill slope between Lots 9 - 10, and 7 - 8 was examined on December 12, 1975. This slope is approximately 15 feet in height oriented in an east west direction and inclined on 2 to 1. The slope generally incorporated interbedded sandstone and claystone of Tertiary age. A thin and very stiff, discontinuous clay seam was noted in the approximate mid-height of the slope. Measurement of the orientation of the seam revealed that it varied from horizontal to approximately 2 to 3 degrees to the west. The compacted fill portion of the slope thickens rapidly towards the west and the slope becomes a fill slope at the western edge of Lot 8. It is our opinion that this compacted fill provides a resisting mass against possible movement in a westerly direction. We have reviewed our previous slope stability analysis taking into consideration the presence of the clay seam. It is our opinion that the presence of this seam does not significantly effect the relative overall stability of the slope. WOOOWNlO-CI,VDC CONSMTIINIS Ponderosa Homes .Project No. 72-253 . February 13, 1976 Page 4 A final inspection of the subdivsion was made by the project engineer on January 23, 1976. This inspection revealed several small wet areas in the slope; however, no free seeping or standing water was noted. The most noticeble wet area was at the toe of the slope at the rear of Lot 14. Here the wetness extended approximately 6 inches above the lot level and generally covered an area approximately 5 feet wide by 15 feet long paralleling the slope. A toe drain consisting of a perforated pipe placed in a shallow trench at the slope toe and embedded in a filter material may be employed to help minimize the problem. This system could exit between lots to a curb outlet. Details of drain construction can be issued upon request. The wet area may dry up in time and depending on construction schedule, it may be convenient to observe the seep for a period of time before making a decision to inctall the drain. Ept&ation Recommendations - All Lots (1) Foundations for single or two-story residential structures placed on nonexpansive undisturbed soil or nonexpansive properly compacted fill may be designed far a bearing pressure of 2,000 psf (dead plus live loads) at a depth of 12 inches below compacted fill or undisturbed cut lot qrade. Footings should have a minimum width of 12 inches. The bearing pressure may be increased by one-third for loads that include wind or seismic forces. (2) Structures that will not tolerate differential settlements (such as foundations, swimming pools, concrete decks, walls, etc.) should not be located within 5 feet of the top of a slope. Footings located closer than 5 feet from the top of a slope should be extended in depth until the outer bottom edge of the footing is 5 feet horizontally from the outside face of the slope. (3) Itis recomnlended that expansive soils be considered in the design of other structures that may be placed on the lots below grade such as swimlning pools. Limitations and Backfilling The elevations of compaction tests shown as finished grade (FG) tests correspond to the elevations shown on the grading plans for "Carlsbad Tract No. 73-18, (Ranch0 De1 Ponderosa) Unit No. 1" dated August 15, 1974, prepared by Rick Engineering Company, San Diego, California. Elevations and locations shown in this report are based on field surveys established by others. WOODWARD~CLVDE CONSlll.TANTS Ponderosa Homes Project No. 72-253 - February 13, 1976 Page 5 This report covers the fill placed under our observation during the dates specified herein. Additional fill placed after these dates, as well as the backfill in utility trenches located within 5 feet of a building and greater than 12 inches deep, or any trench 5 feet or more from a building and in excess of 5 feet in depth, should be compacted under the observation of this office and tested to assure compliance with the earthwork specifications for the project. This office should be contacted at least 24 hours prior to backfilling operations. Utility service trenches within 5 feet of a building that are perpendicular to the building footings and are less than 12 inches wide and less than 3 feet deep are not subject to this recommendation. The inspections of foundation preparation, types of materials and soil placement and compaction as well as tests of compaction made during the period of our services on the subject site were in accordance with the local acceptable standards for this period. The conclusions or opinions drawn from the tests and site inspections apply only to our work with respect to grading and represent conditions at the date of our final inspection. We will accept no responsibility for any subsequent changes made to the site by others or by uncontrolled action of water or by failure of others to properly repair damages caused by uncontrolled action of water. WOODWARD-CLYDE CONSULTANTS LJL/JLH/RPW/EHP/we Attachments (1) Ponderosa Homes, Irvine - Attention: Terry Teeple (4) Ponderosa Homes, San Diego - Attention: Karl Kreutzer (1) Rick Engineering Company WOOOWARD CLVOC CONSIIIIANIS COMPACTION TEST RESULTS JOB NIlME RANCH0 DEL PONUEROSA UNIT NO. 1 DI\TE REPORTED 12-g-75 JOB NUMBER 72-253 DATES COYERED November 12, 1975 Through Decelnber 4, 1975 PAGE 1 OF 3 - YOWTU". VllLD L*.O11*m"" "ILLIIYK DITl 7r.I RcTLar LOEAIIO" ILIYATIOH CO"Tm4, DIUSIT" DIH,lrv coY.IcTIoY HUMBLR or or71111 * DllUT. PC, PC, x 0. LA.. DCY,. -~__ -__ -___ !OV 12 1 LOT 27 2 29 98’ 16.9 101.7 109.5 92.7 98' 17.6 99.5 109.5 90.8 100' 16.9 99.6 109.5 90.9 100' 19.0 101.9 109.5 93.0 101.3 109.5 92.9 103.3 109.5 94.3 100.3 109.5 91.6 163.9 113.5 91.5 102.3 113.5 90.1 104.0 113.5 91.6 103.8 105.2 103.1 104.9 105.2 99.0 103.5 104.9 104.3 113.5 113.5 113.5 113.5 113.5 109.5 113.5 113.5 113.5 113.5 109.5 113.5 113.5 113.5 113.5 113.5 122.0 122.0 111.5 111.5 111.5 113.5 113.5 113.5 113.5 113.5 113.5 113.5 91.3 .~' 92.7 ." 90.9 92.4 92.7 y.; : ;2:4 91.9 91.9 .91.6 91.5 93.3 33.5 92.5 93.8 94.3 91.9 90.8 91.5 92.2 91.4 90.7 92.1 92.7 91.3 91.6 92.7 3 4 28 30 LOT 27 29 28 IOV 13 5 6 102' 17.6 102' 15.6 7 104' 16.9 104' 15.6 a 9 IO 10 .nv 14 11 ~.__ i: 30 29 31 107' 18.3 107' 16.9 110' 17.6 LOT 23 30 32 29 31 112' 16.9 110' 16.3 110' 19.0 112' 15.6 14 15 .nv 17 lG LOT 33 17 32 112' 15.6 115' 16.? 115' 16.9 13 30 19 28 20 29 21 31 115' 17.G 117' 19.0 1 117' 16.9 1 117' 17.6 118' 16.3 120' 15.6 120' 16.3 120' 15.6 3.6 3.0 6.9 5.6 6.3 6.3 04.3 00.3 1 03.9 1 06.0 00.5 05.0 06.6 15.0 1 12.0 II 31.2 22 33 23 44 'iv 12: 24 25 26 27 24 LOT 43 32 30 28 29 30 31 32 101.9 102.8 103.8 26 110' 27 113' LOT 26 115' 18.3 27 118' 18.3 103.0 104.G '105.3 103.6 104.1 105.2 COMPACTION TEST RESULTS JOB idAME RANCH0 DEL PONDCROSA UNIT NO. 1 DATEREPORTED 12-8-75 JOQ NVMBER 72-253 DATES COVERED November 12, 1975 Through December 4, 1975 P.&GE 2 OF 3 YD3IT”II .ICLD lA.O”lro”” “ILAll’ll DATE nsr RE,Z,T LDCAllON ELE”*ItOH COUTlNT DIN*,,” DIH.I1T COYCAnlOY H”“eER or TrsT x 0”” WT. KP Y 0, LA.. DC”.. .-- AOV 20 39 40 LOT 33 44 8 123' 123' 123' 126' 126' 126' 126' 17.6 ~16.3 9.9 13.0 11.1 9.3 10.5 126' 128' 128' 128' 128' 123' 18.3 19.0 16.3 15.6 16.9 19.0 120' 9.9 123' 12.3 125' 11.7 127' 12.3 127' 12.3 130' 14.3 130' 13.0 133' 14.3 133' 14.3 FG 135.8' 135' 137' FG 138.8' 14.9 14.3~ 12.3 15.6 14.9 19.0 17.6 15.6 15.6 14.9 16.9 18.3 17.6 18.3 14.9 17.6 111.5 111.5 122.0 122.0 122.0 122.0 122.0 111.5 111.5 111.5 111.5 111.5 111.5 115.0 115.0 115.0 115.0 115.0 115.0 115.0 115.0 115.0 115.0 115.0 115.0 115.0 115.0 111.5 111.5 111.5 111.5 111.5 111.5 111.5 111.5 111.5 111.5 111.5 91.2 92.6 91.8 93.2 91.7 92.6 91.4 93.0 91.5 93.8 91.9 92.6 :~' 91.3 95.0 93.5 96.5 1 94.3 : 94.7 92.1 91.8 90.6 91 .o 91 .o 92.6 92.7 92.7 92.2 92.0 93.3 92.7 92.5 93.6 94.1 93.0 93.4 94.0 94.1 95.9 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 01.8 03.3 12.0 13.9 12.0 12.9 11.6 03.8 02.1 04.7 02.5 03.3 01.8 10.3 07.7 11.0 03.5 41 42 34 43 32 44 45 30 28 JOV 21 46 47 LOR 8 29 31 33 40 49 50 51 '1OV 22 52 53 54 55 LOT 20 19 21 18 20 21 :i 18 109.0 106.0 105.7 104.2 104.7 60 ~lV.24 61 LOT 19 62 17 104.5 106.4 106.6 106.6 1" 1; G4 65 66 18 a 30 33.4' 29' 30' 30' 30' 1 28' 130' 130' 133' 133' 135' 135' 106.0 102.5 104.0 103.5 103.2 67 68 59 32 34 LOT 45 44. 42 104.5 105.0 103.8 iOV 25 70 71 72 73 ‘I 3 45 104.1 104.9 105.0 107.0 74 75 76 42 44 COMPACTION TEST RESULTS JOB !‘!AME RANCH0 DEL PONDEROSA UNIT NO. 1 0*7E~EPoRTED 12-e-75 JOB NVMBEH 72-253 DHESCOVER~~ November 12, 1975 Through December 4, 1975 PAGE 3 OF 3 - c.ATI TWST RK,I,T LOCATION YOI.I""I .llLD LA.Oll*m"" "lLA7,"1 LL~YIIIOH COUllNT DIHBITI t,X",,W *Y"Bcrl OF OF TLLlT * D"" WT. CoYP.cr,aN PC. v. 0, LA.. ImY., -"_ li:C 3 77 LOT 20 FG 135.0' 13.0 106.9 115.0 92.9 71: 2 'I FG 132.6' 13.0 103.5 115.0 94.2 79 FG 131.6' 14.3 30 104.6 115.0 90.9 :: FG 128.9' 12.3 106.0 115.0 92.1 ::l 26 125' 11.7 103.7 115.0 82 94.4 27 FG 127.0' 11.7 110.6 115.0 96.2 IIEC 4 83 LOT 28 FG 128.2' 13.0 107.0 115.0 34 93.0 29 FG 131.2 13.0 1p7.1 115.0 93.1 35 132' 14.9 86 105.9 115.0 92.1 Sk FG 128.2' 13.6 105.8 115.0 92.1 87 25 FG 127.0' 11.7 107.3 115.0 93.5 .,, COMPACTION TEST RESULTS JOB NaME RAKCiiO DEL POCDEROSA UNIT #l DATEREPORTEO February 13, 1976 JOB NUMBER 72-253 D~T~BC~XRED December 4, 1975.through January 23, 1976 PAGE 1 OF 3 LA~ORATOW “ILAIIYI DIH.IT* COY*AcTIOH PC, % or LAB. DKH.. DEC 4 88 _- E9 LOT 26 FG 126.8' FG 134.4' 133' 133' 136' 136' 11.1 105.2 13.0 106.0 13.0 104.8 12.3 105.5 11.1 104.0 13.0 105.8 FC 138.1' 139' 142' FG 140.2' 138' 138' 138' 141' 141' 141' 141' 12.3 107.3 13.0 105.9 14.3 107.0 11.7 106.6 13.0 106.9 12.3 105.0 12.3 106.0 12.3 106.9 14.9 104.8 11.7 104.3 12.3 106.9 144' 13.0 104.6 144' 11.7 105.0 144' 12.3 106.2 145' 14.3 106.3 148' 13.6 104.1 148' 15.6 110.2 148' 14.3 105.2 148' 13.6 104.8 151' 12.3 103.8 151' 16.3 106.1 151' 16.9 109.9 151' 12.3 106.3 151' 13.0 104.9 154' 11.1 106.9 154' 11.7 105.1 154' 11.7 104.2 154' 13.0 105.7 154' 13.0 107.8 154' 12.3 106.0 158' 11.7 105.0 158' 11.1 105.9 158' 12.3 108.5 158' 12.3 106.2 158' 11.7 106.0 158' 11.1 111.9 158' 13.6 106.9 .91.5 92.1 2: 5:o 5.0 5.0 z; 35 34 SO 91 92 91.0 91.7 90.5 93 32 91.9 93.4 92.0 93.0 92.6 92.9 91.4 .._ 92.2 93.6 DEC 17 94 95 96 97 115.0 LOT 33 35 115.0 115.0 115.0 36 34 51 4453 ii I 11' 11, 11, 11, 5.0 E it; E 4:o 98 99 100 101 52 102 42 103 44 124 46 91.9 91.6 93.7 DEC 18 105 __- 106 107 108 LOT 41 114.0 114.0 114.0 114.0 114.0 114.0 114.0 114.0 114.0 ,113.5 113.5 115.0 115.0 115.0 115.0 115.0 115.0 115.0 115.0 91.8 92.1 93.3 93.4 109 110 111 112 113 114 115 116 DEC 19 117 LOT 45 118 40 119 42 91.4 96.6 92.4 92.0 91 .o 93.5 96.8 92.5 92.2 93.0 91.5 90.6 91.9 93.7 92.3 44 46 :i 121 122 123 124 49 115.0 115.0 115.0 115.0 91.2 92.2 94.4 51 i: 12G 127 128 92.5 2 47 115.0 92.3 115.0 97.2 115.0 93.0 129 130 COMPACTION TEST RESULTS JOB NI\ME RAijCiiO DEL PONDEROSA UNIT #l D*TEREPORTED February 13, 1976 JOB NUMBER 72-253 D~TESCWERED December 4, 1975 through January 23, 1976 PAGE 2 OF 3 DATE TZST RETEST LOCAT,ON ELL”*TION HUMBER OF TEST __- ~ 20 DEC 131 LOT 9 132 10 133 11 134 12 FG ;4” 15 31 DEC 22 139 LOT 32 140 35 141 52 142 50 143 39 144 40 iii 42 146 44 DEC 23 147 148 149 150 151 152 153 154 155 LEC 26 156 LOT 40 157 42 158 159 160 DEC 27 161 162 163 164 165 166 167 168 169 170 LOT 46 53 51 49 i 43 45 47 48 LOT 50 52 8 8 4"; 43 45 FG FG FG FG 27.5' 11.1 108.7 28.4' 12.3 107.7 30.7' 11.7 106.5 31.6' 13.0 105.9 34.0' 13.0 105.0 35.0' 13.0 106.9 37.8' 11.7 108.7 36.2' 14.3 105.0 37.4' 42.5' it % 13.6 105.5 13.6 104.8 14.9 106.0 12.3 105.9 13.0 104.8 13.0 104.7 13.6 107.8 14.9 105.2 160' 162' 162' 162' 162' 162' 162' 162' 162' 164' 164' 164' 164' 164' 14.3 107.5 12.3 106.0 14.3 104.0 13.0 106.1 14.9 1'06.9 164' 14.3 105.8 164' 13.6 106.2 131' 13.0 106.8 134' 12.3 108.3 137' 12.3 108.4 140' 13.0 105.1 16G' 14.3 106.0 166' 12.3 107.7 166' 11.7 108.3 166' 12.3 106.8 “OI,T”I)I ,,LLD CD”TIHT OrY*,T” 5 Dll WT. 13.0 107.0 14.3 104.7 14.3 104.7 13.6 105.8 12.3 108.7 14.3 106.9 13.0 105.0 14.9 105.0 11.7 108.8 115.0 115.0 115.0 115.0 115.0 115.0 115.0 115.0 115.0 115.0 115.0 115.0 115.0 115.0 115.0 115.0 115.0 115.0 115.0 115.0 E 5:o 11 E 5.0 E 2:: 115.0 115.0 115.0 115.0 115.0 115.0 115.0 115.0 93.5 92.2 90.5 92.3 92.7 92.0 92.5 92.7 94.2 94.3 91.4 92.2 93.5 115.0 94.2 115.0 92.7 94.4 93.6 92.6 92.0 91.4 92.9 94.4 91.4 91.6 91.0 92.2 92.0 ..,; 91.1 91.0 93.6 91.5 93.0 : 91 .o 91 .o 92.0 94.4 92.8 91.3 91.3 94.5 COMPACTION TEST RESULTS JOB NAME RANCH0 DEL PCijDEROSA UNIT #1 D*TEREPORTED February 13, 1976 JOB NUMBER 72-253 DATESCOVERED December 4, 1975 through January 23, 1976 PAGE 3 OF 3 DEC 29 171 LOT 47 166' 172 49 166' DEC 30 JAN 22 JAN 23 173 174 175 176 177 178 179 180 181 182 183 184 185 186 187 188 189 190 19,l 192 193 194 195 196 197 198 51 zo” 42 39 41 43 44 LOT 53 52 51 48 FG 169.0' 47 FG 169.3' 46 FG 169.3' 45 FG 169.3' 36 FG 145.0' LOT 37 38 8 LOT 6 4" 16 166' 166' FG 167.7' FG 168.2' FG 167.4' FG 167.9' FG 168.7' FG 169.0' FG 167.6' FG 167.8' FG 168.2' FG 168.5' FG 168.7' 13.0 105.8 14.9 105.0 13.0 108.4 12.3 107.9 13.0 107.8 11.7 108.1 12.3 108.0 13.0 105.5 13.0 105.5 13.0 105.3 FG 147.0' 11.1 107.1 FG 148.4' 11.7 105.0 FG 141.1' 12.3 106.3 FG 142.5' 13.6 104.8 FG 146.1' 13.0 105.4 FG 147.6' 11.7 107.2 FG 151.0' 15.6 104.9 FG 138.8' 12.3 106.5 *O,,V”“= COWIIICT * 0”” WT. 14.9 105.7 15.6 103.4 13.0 105.1 13.0 107.0 13.6 105.2 12.3 110.0 11.1 108.9 12.3 106.0 13.0 107.9 12.3 105.9 t.A~oI*ro~” “ILAIIVI DLHDlTv EOYPACTION 2 % 0, LAP. DLN.. -____ 115.0 115.0 115.0 115.0 115.0 115.0 115.0 115.0 115.0 115.0 115.0 115.0 115.0 115.0 115.0 115.0 115.0 115.0 115.0 115.0 115.0 115.0 115.0 115.0 115.0 115.0 115.0 115.0 91.8 90.8 91.4 93.1 91.5 95.6 94.6 92.2 93.8 92.1 92.0 91.1 .~' 94.3 93.8 93.6 94.0 93.9 : 91.6 91.6 91.5 93.3 91.1 92.5 91.2 91.5 93.4 91.3 92.6 I COMPACTION TEST RESULTS JOB NAME RANCH0 DEL PONDEROSA UwIT #l ~~~~~~~~~~~~ February 13, 1976 .JOQ NUMBER 72-253 (Streets) DATES COYERED November 14, 1975 through January 23, 1976 PaGES-1 d-2 OAll TSST RETLOT LDCAllD” ELE”AmOH NUMBCR 0. OF TEST riov 14 S-l NOV 17 s-2 s-3 NOV 18 s-4 s-5 NOV 20 S-6 s-7 NOV 24 S-8 s-9 iiov 25 s-10 s-11 s-12 s-13 EC 17 s-14 s-15 DEC 18 S-16 S-l 7 DEC 19 S-18 DEC 20 s-19 s-20 LA BR&CA HAY: OPP LOT 30 LA BRUSCA NAY: OPP LOT 29 OPP LOT 31 LA BRUSCA WAY: OPP LOT 28 OPP LOT 30 LA BRUSCA WAY: OpP LOT 9 LA t;f\CAlRENA DRIVE: OPP LOT 8 LA MACARENA DRIVE: Opt' LOT 8 LA BRUSCA WAY: OPP LOT 29 LA BRUSCA WAY: OPP LOT 32 LA MACARENA DRIVE: OPP LOT 35 LA TINADA COURT: OPP LOT 8 OPP LOT 42 LA TINADA COURT: OPP LOT 51 OPP LOT 43 LA TINADA COURT: OPP LOT 44 OPP LOT 41 LA TINADA COURT: OPP LOT 50 LA TINADA COURT: OPP LOT 48 OPP LOT 52 110' 15.6 103.8 114' 16.9 104.0 117' 16.3 105.1 120' 16.9 105.2 123' 17.6 101.8 126' 15.6 104.2 126' 15.6 105.3 130' 16.3 103.8 130' 16.3 105.0 133' 17.6 103.9 133' 17.6 101.8 135' 16.9 103.6 135' 13.0 107.0 140' 144' 14.9 11.7 105.9 107.3 148' 13.0 106.0 152' 12.3 105.0 155' 159' 159' 14.3 11.1 12.3 107.0 104.0 106.2 FIILD LA~ORATOR” “LUIIVI q IUSITI DSH,,Tv EOYCACTlOll --EL- * 0, !-Am. 0n.H.. PC, 113.5 113.5 113.5 113.5 111.5 113.5 113.5 113.5 113.5 113.5 109.5 113.5 115.0 115.0 115.0 115.0 115.0 115.0 115.0 115.0 91.4 91.6 92.5 92.7 91.2 91.7 92.7 .' 94.1 92.5 : 91.5 92.7 91.3 93.0 92.1 93.5 92.0 91.4 93.0 90.5 93.3 . . COMPACTION TEST RESULTS JDQ NAME RANCH0 DEL PONDEROSA UNIT #T ~~~~~~~~~~~~ February 13, 1976 JOB NUMBER 72-253 (Streets) DATES COYERED November 14, 1975 through January 23, 1976 PnGE s-2 OF s-2 DATE Tn(lT RETEET LOClTlON ELEY*TIOH NUMBLR or OF TEST - DEC 23 s-21 LA s-22 DEC 26 S-23 LA S-24 s-25 TINADA COURT: OPP LOT 51 OPP LOT 45 TINADA COURT: OPP LOT 43 OPP LOT 40 LOS PINOS DRIVE: OPP LOT 53 162' 11.7 105.1 115.0 91.5 162' 13.0 104.8 115.0 92.1 165' 165' 164' JAN 23 S-26 LOS PINOS DRIVE: OPP LOT 54 168' S-27 OPP LOT 53 170' YOISTVII ,IILD LA~OIAIO** “‘UT,“. CO”TZNT DINBlT” DI(NmT* COYP*cTIO” * DIY ‘II. PCI % or IAm. OL*L,. 16.9 I109.9 113.5 96.8 13.6 104.8 115.0 92.1 14.3 105.0 115.0 91.4 11.1 112.0 115.0 97.3 13.6 106.9 115.0 93.2 ." ‘. COMPACTION TEST RESULTS ,’ Joe NnME RANCH0 EEL PONDEROSA UNIT #l JOBNVMBER 72-253 (Electrical Trench Backfill) DATEsCOYEREDDecember 29, 1975 through January 6, 1976 DATEREPORTED February 13, 197 PKk-1 OF E-1 YOI.T”II llr2.D l.A.OR*TOn* “lLATl”l O*TL nm RrTEIT LOC*TtON ELEY*TION CONIINT DrNslr” OSN.IT* CDUPlCTlOH NUMBCR OF OF TEST * D”V WT. KI % or LAB. DLW‘. ___- --- -.___ DEC 29 E-l OLIVENHAIN ROAD: STA 23t60 130' 14.9 104.5 115.0 91.0 E-2 STA 23tO0 131' 14.3 106.4 115.0 92.4 E-3 STA 22tO0 134' 14.9 106.0 115.0 92.1 DEC 30 E-4 OLIVENHAIN ROAD: STA 22tO0 125' 13.0 106.7 115.0 92.7 E-5 STA 22t50 129' 14.3 104.6 115.0 90.8 JAN 5 E-6 OLIVENHAIN ROAD: STA 20tO0 115' 12.3 106.0 115.0 92.0 E-7 STA 18tO0 105' 14.3 104.7 115.0 91.0 E-8 STA 18t80 111' 14.3 104.2 115.0 90.6 .', JAN 6 E-9 OLIVENHAIN ROAD: STA 2Ot75 121' 13.0 105.7 115.0 91.8 E-10 STA 16tO0 95 ' 14.3 106.0 115.0 92.0 PLASTICITY CHARACTERISTICS , 2 I3 { SILT b CLAY] ~~I::~ Classification by Unified Soil z 60 2 tu 40 ) 2 ZERO AIR VOIDSCURVES %! 20 nl ’ II I I II I I II II I I 1 \--h 2.50 SG iooo 100 10 1.0 0.1 0.01 0.001 GRAIN SIZE, mm MECHANICAL ANALYSIS Final Water Content, % Apparent Cohesion, psf Apparent Frktion Angle, degrees SWELL TEST DATA I I I I lflitial Dry Density, pcf -..__ -- Inillal Warer Content, % _--_ - _-~ ~~~__.. Final Dry Density. pcf Final Water Content % --1- 1 Load, psf Swell, percent SAMPLE LOCATION 1 !a#9 2 wff-?5 Optimum Moisture 3 LOT #I 77 L AIIOIlAlO,,Y (:OMI’ACTION ,~,L!il do II:ST M~-IIIOI): 5lM-I) l!i57-70e:~fl LAnORATOnY COMPACTION ~..~-- ‘. l-000 100 10 1.0 0.1 0.01 0.001 GRAIN SIZE. mm MECHANICAL ANALYSIS DIRECT SHEAR TEST DATA 4 5 PLASTICITY CHARACTERISTICS 4 5 Liquid Limit, % ZERO AIR VOIDSCURVES Dry Density. pcf 109.6 102.7 Initial Water Content, % 12.9 14.9 Final Water Content. % ,.- 12.1 19 .n ~~_- Apparent Cohesion. prf ..joo 280 Apparent Friction Angle, degrees 1 32” 30” ILAIIDffA~fOItY COMPACTION TEST LABoRAToRY yfy~~fi~\~~,-7” I\ TLS~f MC11101): :~ I II I, :;lll~rAllll,ITY Tl’S~l’S I:Al~ll.llrl Ill I I’~ii~lnl~lci,!;/\ // I 11II,\WN II” .~ I,‘, 1 “I’!,‘:“‘~,; ,;Y:~~~-l,~IIoI1~!l)N(I. I/;I-~~~~_l._~I-I;--‘I~~ij_l_lL111161;nl_NI(__ PLASTICITY CHARACTERISTICS 6 7 I rCOBBLES I GRy,L I _ , SAN: I Liouid Limit % SILT L CLAY I ,G,T,C,nl, f I I 1-l I Plasticitv Index. % INPINPI I ‘--I I..:.;~, ~~~~, Class!fmtlon by Unified Soil 80 1 Classification System 1 Xl 1 >M 1 ‘i? 2 6” 2 60 + 5 40 E /’ / / 1000 100 10 1.0 0.1 0.01 0.001 GRAIN SIZE, mm MECHANICAL ANALYSIS DIRECT SHEAR TEST DATA fj 7 Dry Density. pcf .~ 9.3 107.4 Initial Water Content, % 17.1 15.4 Final Water Content, % 16.1 19.7 Apparent Cohesion. psf 60 160 Apparent Friction Angle. degrees 31 a 35’ SWELL TEST DATA I I I 1 Initial Dry Density, pcf I-- ___ I Initial Water Content. % ___-__ 1 Final Dry Density. pcf Final Water Content, 96 Load, psf Swell, percent LABORATORY COMPACTION --^- . .r-. .^^. TM -D L557 711 A LABORATORY COMPACTION TEST I tsr Nit I nvv FILL SUITARII.ITY TESTS IUNCtIO DLL PONDEROSA f/l P"O.lECT NO: 77- 253 DATE: Y/13/76 FlO"HE NO: :j . ..^" -..,__- ^...^ L - --.- -.------~-