HomeMy WebLinkAboutCT 73-18; Rancho Del Ponderosa Unit 1 Lots 17-25; Soils Report; 1975-12-08WOODWARD-CLYDE CONSULTANTS CONSIJLTING ENGINEERS. GEOLOGlSTS AND EN"lRclNMENTAL SClENTlSTS WESTERN REGION 3467 Kurtl street San Diego December 8, 1975 Callfornla 92110 Project No. 72-253 Phone (714) 7242911 Ponderosa Homes 2082 Business Center Drive, Suite 100 Irvine, California 92664 Attention: Mr. Terry Teeple FINAL REPORT OF ENGINEERING OBSERVATION AND COMPACTION TESTING RANCH0 DEL PONDEROSA UNIT NO. 1 (CARLSBAD TRACT 73-18) LOTS 17 THROUGH CARLSBAD, CALIFORNIA In accordance with your request and our agreement dated October 24, 1975, we are providing soil engineering services in conjunction with the grading of the subject site. These services included: (1) Engineering observation of the grading operation. (2) Observation of the removal of loose surface and alluvial soil where encountered prior to placing fill. (3) Observation of the removal of potentially expansive soil from the top 2 feet of rough lot grade where encountered. (4) Taking field density tests in the fill placed and compacted. (5) Performing laboratory tests on representative samples of the material used for fill. Site preparation, compaction, and testing were done between November 12 and December 4, 1975 in general accordance with the "Specifications for Controlled Fill" in the Woodward-Gizienski & Associates report entitled "Soil Investigation for the Proposed Ranch0 De1 Ponderosa Development (Weigand Property), San Diego County, California", dated September 13, 1973. s1010.21.58 Ponderosa Homes Project No. 72-253 December 8, 1975 Page 2 General Site Grading Fill was placed, compacted, and tested on Lots 17 through 25. The grading operation essentially consisted of removing loose surface soil where encountered, preparing the ground surface prior to placing fill and making design cuts and fills. As the site grading progressed, the compaction procedures were observed, and field density tests were made to determine the relative compaction of the fill in place. Field observations and field density test results indicate that the fill has been compacted to 90% or more of maximum laboratory density. The approximate locations of field density tests and the limits of compacted fill have been recorded on a copy of the grading glan for reference. The results of field density tests and of relative compaction, expressed as a percent of maximum laboratory density, are given on the attached forms. Laboratory tests to determine moisture-density relationships, maximum dry density, optimum moisture content, grain size distribution, plasticity characteristics, and strength characteristics were performed on representative samples of the material used for fill. The results of laboratory tests are given on the attached forms. Finish Grade Soil Conditions .__--____ All the lots covered by this report are cut-fill or fill lots. Laboratory tests and visual inspection indicate that nonexpansive fill was placed within 2 feet of rough grade on all fill lots and on the fill portions of cut-fill lots noted herein. In the case of the cut portion of cut-fill Lots 20 through 25, potentially expansive soil was excavated and replaced with nonexpansive fill to a depth of 2 feet below roughs lot grade and within the limits of the entire level lot. Rough lot grade is defined as that grade set in the field by the grade checker from reference stakes established by the surveyor and represents rough grade at the time we were inspecting the removal and replacement of expansive soils. Likewise the depths of undercutting of expansive soil and/or depths of placement of nonexpansive soil were in accordance with Imeasurements made by and grades set by the contractor's grade checker. WOODWARD-CLYDE CONSULTRNTS rll*.11*11*.. L*lll”E.“.. Ih.<III>” I.,. .“O .*“I”II*“.“lll ,E,.N,l.,. Ponderosa Homes Project No. 72-253 December 8, 1975 Page 3 Foundation Recommendations - All Lots (1) Foundations for single or two-story residential structures placed on nonexpansive undisturbed soil or nonexpansive properly compacted i fill may be designed for a bearing pressure of 2,000 psf (dead plus live loads) at a depth of 12 inches below lowest adjacent rough or compacted grade. Footings should have a minimum width of 12 inches. These pressures may be increased by one-third for loads that include wind or seismic forces. (2) Structures that will not tolerate differential settlements (such as foundations, swimming pools, concrete decks, walls, etc.) should not be located within 5 feet of the top of a slope. Footings located closer than 5 feet from the top of a slope should be extended in depth until the outer bottom edge of the footing is 5 feet horizontally from the outside face of the slope. The elevations of compaction tests shown as finished grade (FG) tests correspond to the elevations shown on the grading plans for "Carlsbad Tract 73-18, (Ranch0 De1 Ponderosa Unit 140. l)", dated August 15, 1974, prepared by Rick Engineering Company, San Diego, California. Elevations and locations shown in this report are based on field surveys established by others. This report covers the fill placed under our observation during the dates specified herein. Additional fill placed after these dates, as well as the backfill in utility trenches located within 5 feet of a building and greater than 12 inches deep, or any trench 5 feet or more from a building and in excess of 5 feet in depth, should be compacted under the observation of this office and tested to assure compliance with the earthwork specifications for the project. This office should be contacted at least 24 hours prior to backfilling operations. Utility service trenches within 5 feet of a building that are perpendicular to the building footings and are less than 12 inches wide and less than 3 feet deep are not subject to this recommendation. The inspections of foundation preparation, types of materials and soil placement and compaction as well as tests of compaction made during the period of our services on the subject site were in accordance with the local acceptable standards for this period. The conclusions or opinions drawn from the tests and site inspections apply only to our work with respect to grading and represent conditions at the date of our final inspection. WOODWARD-CLYDE CONSULTANTS <.<1*.1*1 Ia*” **<,,*..I,, O.,llll<l I.,. .*m .*11111*1.*11, .<:,1*1 I,,. Ponderosa Homes Project No. 72-253 December 8, 1975 Page 4 We will accept no responsibility for any subsequent changes made to the site by others or by uncontrolled action of water or by failure of others to properly repair damages caused by uncontrolled action of water. WOODWARD-CLYDE CONSULTANTS ,,’ ,;i’ &/g&c-&( ,~James L. Henry, (,.- LJL/JLH/EtiP/RPW/jr Attachments (1) Ponderosa IHomes (4) Ponderosa Homes, San Diego Attention: Karl Kreutzer (1) Rick Engineering Company WOODWARD-CLYDE CONSULTANTS CII”.YI,I”Y .“<I#“. . . . . O.“L‘mI.l. L”D .““I”I>*“I*I*L .c1.*11.1. ’ COMPACTION TEST RESULTS JOB NAME RANCH0 DEL PONDEROSA UNIT NO. 1 DATE ~wor=xm ‘2-8-75 JOB NUMPER 72-253 DATES COYEREO November 12, 1975 Through December 4, 1975 PAGE 1 or 3 .llLD LA.O”AW”” “IUIIY. DIH.,,” D~“.l?-i ~0”,.cr10” -z-- KI x 0. LA.. DE”‘. -- 16.9 101.7 17.6 99.5 16.9 99.6 19.0 101.9 17.6 101.8 15.6 103.3 16.9 100.3 15.6 103.9 18.3 102.3 16.9 104.0 17.6 103.8 16.3 105.2 19.0 103.1 15.6 104.9 16.9 105.2 15.G 99.0 103.5 104.9 104.3 104.3 100.3 103.9 106.0 RSl REIISl LOEATlOH rLEY*,ION NUMOFR 0, OF ,LIlT --- - 1 6.9 6.9 7.6 9.0 6.9 17.6 16.3 120' 15.6 120' 16.3 120' 15.6 120' 13.6 13.0 16.9 15.6 16.3 16.3 100.5 105.0 106.6 115.0 112.0 101.2 101.9 102.8 103.8 18.3 103.0 18.3 104.6 15.6 105.3 19.0 103.6 15.6 104.1 16.3 105.2 109.5 109.5 109.5 109.5 109.5 109.5 109.5 113.5 113.5 113.5 113.5 113.5 113.5 113.5 113.5 109.5 113.5 113.5 113.5 113.5 109.5 113.5 113.5 113.5 113.5 113.5 122.0 92.7 90.8 90.9 93.0 92.9 94.3 91.6 91.5 90.1 91.6 91.3 92.7 90.9 92.4 92.7 90.4 91.2 92.4 91.9 91.9 91.6 91.5 93.3 88.5 92.5 93.8 94.3 91.9 90.8 91.5 92.2 91.4 90.7 92.1 92.7 91.3 91.6 92.7 iiov 12 :iov 13 10 (JOV 14 ilOV 17 :IOV 18 AOV 19 LOT 27 98’ 29 98’ 28 100' 30 100' LOT 27 El 102' 102' 104' 8 104' 9 2 107' 10 31 107' 11 LOT 28 10' ;L 12' 12' 12' 16 ;; LOT 33 32 I 115' 115l 115' 117' 117' 117' 118' 23 24 25 LOT 43 32 30~ 28 2276 28 24 43 120' 105' 108' 110' 113' 1 22.0 1 11.5 : 11.5 11.5 1 13.5 3.5 3.5 3.5 3.5 3.5 3.5 29 26 30 27 31 26 32 27 33 34 LOT 26 115' 27 118' 26 120' 35 36 37 38 27 :B 123' 123' 123' : COMPACTION TEST RESULTS Joe NAME RANCH0 DEL PONDEROSA UNIT NO. 1 DATE REPORTED 12-8-,5 JOB NUMBER 72-253 DATES COYERED November 12, 1975 Through December 4, 1975 PAGE 2 or 3 DATE 3m.T IlnK,T L~CATIO” ELLYlTlDW yy.“.“f .,mLo LA.O”Aro”” “lU,lYl DIN*IT” Dml4.m co*cAcvIoY NU”BEIl 0, O.TIST !A 0”” WT. PC, ?c. Y 0. LA.. DIY.. -.- .---_ NOV 20 39 ~__ i? 42 ii 45 NOV 21 46 47 ii 50 51 NOV 22 52 53 54 55 56 z: 59 20 60 18 idOV.24 61 LOT 19 62 17 63 18 64 17 65 18 66 8 67 El IiOV 25 70 71 72 73 74 75 76 LOT 33 44 8 34 32 30 28 LOR 8 LOT 20 :: 18 2 19 30 32 34 LOT 45 44 . 42 43 :: 44 123' 17.6 101.8 123' 16.3 103.3 123' 9.9 112.0 126' 13.0 113.9 126' 11.1 112.0 126' 9.3 112.9 126' 10.5 111.6 126' 18.3 103.8 123' 19.0 102.1 128' 16.3 104.7 128' 15.6 102.5 128' 16.9 103.3 128' 19.0 101.8 120' 9.9 110.3 123' 12.3 107.7 125' 11.7 111.0 127' 12.3 103.5 127' 12.3 109.0 130' 14.3 106.0 130' 13.0 105.7 133' 14.3 104.2 133' 14.3 104.7 FG 135.8' 14.9 104.5 135' 14.3 106.4 137' 12.3 106.6 FG 138.8' 15.6 106.6 FG 133.4' 14.9 106.0 129' 19.0 102.5 130' 17.6 104.0 130' 15.6 103.5 130' 15.6 103.2 128' 14.9 104.5 130' 16.9 105.0 130' 18.3 103.8 133' 17.6 104.1 133' 18.3 104.9 135' 14.9 105.0 135' 17.6 107.0 111.5 111.5 22.0 22.0 22.0 22.0 22.0 11.5 11.5 11.5 11.5 11.5 11.5 115.0 115.0 115.0 115.0 115.0 115.0 115.0 115.0 115.0 15.0 15.0 15.0 15.0 15.0 11.5 11.5 111.5 111.5 111.5 111.5 111.5 111.5 111.5 111.5 111.5 91.2 92.6 91.8 93.2 91.7 92.6 91.4 93.0 91.5 93.8 91.9 92.6 91.3 95.8 93.5 96.5 94.3 94.7 92.1 91.8 90.6 91.0 91.0 92.6 92.7 92.7 92.2 92.0 93.3 92.7 92.5 93.6 94.1 93.0 93.4 94.0 94.1 95.9 COMPACTION TEST RESULTS JOB iNAME RANCH0 DEL PONDEROSA UNIT NO. 1 DATEREPORTED 12-8-75 Joe NUMBER 72-253 DATESCOVERED November 12, 1975 Through December 4, 1975 PAGE 3 0, 3 o*r= TC‘V 11111*1 LOCAIIOIl YOIM”E .llLD l.A.OIAro”” “.U,I”l HUMBER 0, l!LLY*TIO* 50*11N? DmNml” D~“‘,Tv COICACTIOY or TIST -.- .--__ + D”” WT. -“_ CSI # 0. LA.. Lm**. DEC 3 77 LOT 20 FG 135.0' 13.0 106.9 115.0 92.9 :i ;: FG FG 132.6' 131.6' 13.0 14.3 1oa.5 104.6 115.0 115.0 94.2 90.9 80 23 FG 128.9' 12.3 106.0 115.0 92.1 El 125' 11.7 108.7 115.0 94.4 82 FG 127.0' 11.7 110.6 115.0 96.2 iDEC 4 LOT 28 :7 24 FG 128.2' 13.0 107.0 115.0 93.0 FG 131.2 13.0 107.1 115.0 93.1 132' 14.9 105.9 115.0 92.1 FG 128.2' 13.6 105.8 115.0 92.1 87 25 FG 127.0' 11.7 107.3 115.0 93.5 PLASTICITY CHARACTERISTICS 1 2 3 ICOBBLESI TA/y1 c, zp f 1 SILT h CLAY [ Liquid Limit, % 54 44 no Plasticity Index, % 35 24 1001 I I I r--*--A. I I 1 Classification bv Unified Soil -,. -. I,1 I” 1 Classification l2-l CL P-l 80 60 40 E ZERO AIR VOIDSCURVES P 20 0 1000 100 10 GRAIN SIZE, mm MECHANICAL ANALYSIS DIRECT SHEAR TEST DATA 12 3 Dry Density, pcf 89.6 102.2~ 90.2- Initial Water Content, % 16.0 17.9 15.3 Final Water Content. % 2.U 24.3 27.6 Apparent Cohesion, psf 7nn 5Rf-l i ?~80 Apparent Friction Angle. degrees 80 7”” 17” SWELL TEST DATA lnitiel Dry Density. pcf I 1 Final Dry Density, pcf Final Water Content. % t-l Load. psf - Swell, percent I I I SAMPLE LOCATION 1 I0T # 9 2 LOT # 25 3 IOT # 77 40 LABORATORY C MPACTION LABORATORY COMPACTION TEST TESTMETHO!,: f STM-D 1557-70 -A FILL SUITABILITY TESTS RANCHO DEL PONDEROSA #l DRAWN BY: /\s CHECKED BY@ PROJECTNO: 72-253 DATE: 12-[{-75 FIGVRE NO: W”““Wl¶R”.PI ““F r”NclllT1Iurc 151 14( 13c 1x 11c 100 90 80 PLASTICITY CHARACTERISTICS 4 5 I I COBBLESl TA/F 1 c, sp1”y f 1 SILT b CLAY Liquid Limit, % 31 Plasticity Index, % 9 Classification by Unified Soil Classification SYstem SC NP VOIDSCURVES 100 g 80 g E 60 : 40 2 e 20 II II I 1000 100 10 1.0 0.1 0.01 0.001 GRAIN SIZE, mm MECHANICAL ANALYSIS DIRECT SHEAR TEST DATA 4 5 Dry Density, pcf 109.6 102.7 Initial Water Content, % 12.9 14.9 Final Water Content, % 3210 7.1 19.0 Apparent Cohesion. psf 280 Apparent Friction Angle, degrees 32" 30" SWELL TEST DATA I 1 Initial Dry Density, pcf Initial Water Content. % Final Dry Density, pcf Final Water Content, % aad. psf . . . -II Maximum Dry Density. pcf : L”N I tNT, % I” 20 30 40 LABORATORY COMPACTION TEST FILL SUITABILITY TESTS RANCH0 DEL PONDEROSA # 1 I DHPiWN BY: i\s CHECKED BY: PROJECT NO: 72-253 DATE: ,2-&75 1 FlG”RENO: WOOUWARD-CLYDE CONSULTANTS PLASTICITY CHARAC’rERlSTlCS 11 12 13 CODBLES S!!W s>WL c f c II, , , Lilluid Linlit, ‘76 34 - PI:Isticity I,xhx, X Jll’~L .L L Classification by Unified Soil Classification System (31) SC-m (SM) ZERD AIR VOIDS CURVES 1000 100 10 1.0 0.1 0.01 GRAIN SIZE. mm MECHANICAL ANALYSIS DIRECT SHEAR TEST DATA ,I ,2 I Dry Density, pcf 111 107 ID4 1 '- Initial Water Content. % 13 16 Final Water Content, % 17 20 __ ..-- ~-. ApparenLCaherion, psf 180 560 Apparent Friction Aoglc. dugreci 3y” 27-F --, SWELL TEST DATA Initial Dry Density, pcf Initial Water Content, % Final Dry Density, pcf Final Water Content, % Load, psf -.--- Swell. percent 11 12 -_ DA-..- -- 17 __ .-La- - __ 21 -- 160 1: -_ 0.7 kximum Dry 11 12 1 Dcnrity. pcf 118.5 115.5 116.0~-1.&M Optimum Moisture Content. % 12.0 15.0 13.0 MOISTURE CONTENT, % 10 20 30 40 wlqk\ [ 13 1 Fill lot l@-217 LABORATORY COMPACTION TEST FILL SUITABILITY TESTS RANCH0 DEL POKDEROSA DRAWNBY: BH 1 CHECKEDBY ECTNCI: 72-253F DATE: 6-14-761 FGVRE NO: 2. WOODWARD-CLYDE CONSULT;