Loading...
HomeMy WebLinkAboutCT 73-29; Carrillo Estates; Final Soils Report; 1977-08-05. . .67-i~rlz Street jan Dlego. Calllorn!a 921 10 ', Telex 697-841 714-224-2911 Ponderosa Homes, Inc. Suite 2E 70951 Sorrento Valley Road San Diego, California 92121 Attention: Mr. Ron Shackleford WkmdwardDClyde Consultants August 5, 1977 Project No. 77-105-9F FINAL REPORT OF ENGINEERING . -i . ~- " OBSERVATION AND COMPACTION TESTING CARILLO ESTATES UNIT NO. 1 CARLSBAD, CALIFORNIA In accordance with your request and our agreement dated December 19, 1976, we have provided soil engineering services in conj ction with the grading of the subject site. These services included: r (1) Engineering observation of the grading operation; (2) Observation of the preparation of areas to receive fill; (3) Observation of the removal of potentially expansive soil, where .. -i encountered, at rough lot grade and replacement with non-expansive (4) Observation of the removal of hard rock, where encountered, in the soil ; top two feet of rough lot grade and replacement with select material ; (5) Taking field density tests in the fill placed and compacted; and (6) Performing laboratory tests on representative samples of the material used for fill. GENERAL SITE GRADING /"- Site preparation, compaction, and testing were done between February 22 opinion that this earthwork was completed in general accordance with the and July 21, 1977. Based on our observation and testing, it is our earthwork reconunendations in the Woodward-Gizienski and Associates report entitled "Soil Investigation for the Proposed Carillo Estates, Carlsbad, California," dated September 6, 1973, and the "Specifications for Con- trolled Fill" in our addendum letter dated October 24, 1975, entitled "Clarification of Slope Stability Analyses and Earthwork Specifications, Carillo Estates, Carlsbad, California." Fi 11 was placed, compacted, and tested on Lots 71 through 83, and 93 watering and compacting loose soil on the lots prior to placing fill to through 134. The grading operation essentially consisted of scarifying, bring the lots to design grades. Potentially expansive soil and oversize rock encountered within the top two feet of rough lot grade was removed and replaced with properly compacted select soil. Consulting Engineers. Geolcglsts and EnvironmentalScientlsts Oltlces in Other Prlnclpal Clttes S1010.14.26 KA W 1. .,' ,' .. 'erosa Homes, Inc. j'ect No. 77-105-9F 5t 5, 1977 Woodward-Clyde Consultants Jge 2 - i /, As the site grading progressed, the compaction procedures were observed, and field density tests were made to determine the relative compaction of the fill in Dlace. Field observations and field density test results . " -~ ~ indicate that the fill has been compacted to 90% or more if maximum laboratory density. The approximate locations of field density tests and the limits of compacted fill have been recorded on a copy of the grading plan for reference. The results of field density tests and of are given on the attached forms. relative compaction, expressed as a percent of maximum laboratory density, Laboratory tests to determine moisture-density relationships, maximum dry density, optimum moisture content, grain size distribution, plasticity on representative samples of the material used for fill. The results characteristics, and strength and swell characteristics were performed of laboratory tests are given on the attached forms. FINISH GRADE SOIL CONDITIONS During the grading operation certain lots were specially treated to pro- vide a specified depth of selected soil at rough grade. Laboratory tests and visual inspection indicate that nonexpansive fill was placed within two feet of rough grade on all fill lots and on the fill portion of cut-fill lots. On Lots 93 through 98 potentially expansive soil was excavated and re- grade and within the limits of the entire level lot. In addition, rock placed with nonexpansive fill to a depth of two feet below rough lot were removed and disposed of in deeper fill areas in accordance with outcrops existing in areas of shallow cut and fill on Lots 71, 72 and 73 specifications. A visual inspection of cut Lots 84 through 92 and the cut portion of cut-fill Lots 83 and 99 through 105 at completion of grading indicates that potentially expansive soil is not evident at rough surface. FOUNDATION RECOMMENDATIONS - ALL LOTS Foundations for single or two-story structures placed on nonexpan- sive undisturbed soil or nonexpansive properly compacted fill may be designed for a bearing pressure of 2,000 psf (dead plus live loads) at a depth of 12 inches below compacted fill or undisturbed The bearing pressure may be'increased by one-third for loads that cut lot grade. Footings should have a minimum width of 12 inches.. include wind or seismic forces. Structures that will not tolerate differential settlements (such as .foundations, swimming pools, concrete decks, walls, etc.) should not be located within five feet of the top of a slope. Footings located closer that five feet from the top of a slope should be ex- feet horizontally from the outside face of the slope. tended in depth until the outer bottom edge of the footing is five Ponderosa Homes, Inc. August 5, 1977 Project No. 77-105-9F Page 3 Woodward-Clyde Consultants GENERAL The elevations of compaction tests shown as finished grade (FG) tests correspond to the elevations shown on the grading plans for "Carlsbad Tract No. 73-29, (Carillo Estates Unit No. l)," dated February 22, 1977, prepared by Rick Engineering Company. Elevations and locations shown in this report are based on field surveys established by others. Rough lot grade is defined as that grade set in the field by the grade checker from reference stakes established by the surveyor, and repre- . -i .- sents rough grade at the time we were inspecting the removal and replace- " merit of expansive soils. Likewise, the depths of undercutting of expansive soil and/or depths of placement of nonexpansive soil were in accordance with measurements made by and grades set by the contractor's grade checker. This report covers the fill placed under our observation during the dates specified herein. Additional fill placed after these dates, as well as the backfill in utility trenches located within five feet of a building and greater than 12 inches deep, or any trench five feet or more from a building and in excess of five feet in depth, should be compacted under the observation of this office and tested to verify compliance wi%h the earthwork specifications for the project. This office should be con- tacted at least 24 hours prior to backfilling operations. Utility . service trenches within five feet of a building that are perpendicular to the building footings and less than 12 inches wide and less than three feet deep are not subject to this recommendation. The inspections of foundation preparation, types of materials and soil placement and compaction, as well as tests of compaction made during the local acceptable standards for this period. The conclusions or the period of our services on the subject site, were in accordance with work with respect to grading, and represent conditions at the date of opinions drawn from the tests and site inspections apply only to our our final inspection. We will accept no responsibility for any subsequent changes made.to the others to properly repair damages caused by uncontrolled action of site by others, or by uncontrolled action of water, or by failure of water. NOO9@%D-CLYDE CONSUL3 Richard P. While, R.E. 21992 JEC/JLHjRPW/EHP/sva Attachments (4) Ponderosa Homes, Inc., San Diego (2) Ponderosa Homes, Inc., Irvine - COMPACTION TEST RESULTS .I JOL ~pu; . CARILLO ESTATES UNIT Yl JOB NUMBER 77-105-9F (STREETS) DATESCOVERED March 17, 1977 through July 20, 1977 DATEREPORTED August 5, 1977 PAGE s-1 OF 5-3 114.7 125.5 91.3 MARCH 17 S-1 GAVIOTA LN OPP LOT 65 384 ' 10.5 MARCH 18 5-2 GAVIOTA LN OPP LOT 139 388' 14.3 s-3 GAVIOTA LN OPP LOT 140 392' 10.5 GAVIOTA LN OPP LOT 141 396' 9.9 s-5 FLAMENCO ST OPP 'LOT 142 394' 11.1 . -" MARCH -i 9 - s-4 " 108.7 115.2 117.0 125.5 92.0 91.7 115.1 114.1 125.5 125.5 91.6 91 .o FLAMENCO ST OPP LOT 63 FLAMENCO ST OPP LOT 62 410' 398' 13.0 13.6 103.5 104.8 104.0 106.8 107.1 103.6 104.9 106.0 106.0 114.0 114.0 114.0 114.0 114.0 90.7 92.0 91.3 93.7 94.0 MARCH 21 S-6 s-7 S-8 . FLAMENCO ST OPP LOT 1 GAVIOTA LN OPP LOT 142 GAVIOTA LN OPP LOT 138 402 ' 14.9 401 ' 13.0 393' 14.9 430' 15.6 434' 14.3 440 437 ' 13.0 12.3 452' 13.0 MARCH 24 S-9 s-10 APRIL 1 S-11 5-12 .. 112.0 1 12.. 0 SOCORRO LN OPP LOT 29 SOCORRO LN OPP LOT 27 92.3 92.1 S-13 5-14 SOCORRO LN OPP LOT 32 SOCORRO LN OPP LOT 26 SOCORRO LN OPP LOT 35 114.0 114.0 114.0 93.0 93.0 92.5 105.7 105.2 105.0 APRIL 4 S-15 S-17 S-16 sOCORRO LN OPP LOT 32 SOCORRO LN OPP LOT 39 442' 18.3 473 ' 13.0 ." ~.~~ 114.0 114.0 92.2 92.0 S-18 SOCORRO LN OPP LOT 37 LA GOLONDRINA ST OPP 468' 14.9 380 ' 13.6 105.0 106.9 107.6 114.0 114.5 114.5 92.0 93.3 94.0 APRIL 13 S-19 5-20 LA GOLONDRINA ST OPP LOT 57 385 ' 14.9 LOT 10 LA GOLONDRINA ST OPP LOT 58 390' 14.3 396' 12.3 " _< >'* . : .'> 106.1 114.0 93.1 APRIL 19 5-21 .. ~. . : . :. . , . 4 ,. .., . .; " . c APRIL 21 S-22 . I. .. . .,.. ~. ,. 109.2 ..:, . . 118.0 LA GOLONDRINA ST OPP LOT 9 92.6 108.4 11.8.0 91.9 APRIL 26 5-23 LA GOLONDRINA ST OPP 402' LOT 57 12.3 LA GOLONDRINA ST OPP 453' 14.9 LOT 49 102.3 111.5 91.7 102.2 111.5 91.6 APRIL 28 S-24 S-25 LA-GOLONDRINA ST OPP 442' 15.6 LOT 51 COMPACTION TEST RESULTS JoEN~ME ' ' CARILLO ESTATES UNIT #1 DATEREPORTED August 5, 1977 Jos NUMBER 77-105-9F (STREETS) DATE~COVERED March 17, 1977 through July 20, 1977 PAGE 5-2 of S-3 _c MAY 3 5-26 LA GOLONORINA ST OPP 408 ' 13.0 105.9 114.0 92.9 LOT 56 LOT 58 5-27 LA GOLONDRINA ST OPP 408 ' 13.0 107.0 118.0 90.7 . _" MAY4' MAY 5 MAY 11 MAY 12 MAY 19 MAY 25 MAY 31 JUNE 1 JUNE 3 * S-28 5-29 5-30 5-31 5-32 s-33 s-34 s-35 5-36 5-37 5-38 s-39 S-40 5-41 s-42 . ., s-43 s-44 . .. 5-45 5-46 s-47 . 5-48 LA GOLONDRINA ST OPP 412' 408 ' EL PERICO ST OPP LOT 10 412' LA GOLONORINA ST OPP 417' LA GOLONDRINA ST OPP 411 ' EL PERICO ST OPP LOT 11 417' LA GOLONDRINA ST OPP EL PERICO ST OPP LOT 10 422' 422' LA GOLONDRINA ST OPP 418' LA GOLONORINA ST .OPP LOT 57 LOT 59 .~ .. ~ .. . . . LOT 56 LOT 9 LOT 55 LOT 57 LA GOLONORINA ST OPP 427' LOT 11 LA GOLONDRINA ST OPP 431 ' EL PERICO ST OPP LOT 10 426' LOT 54 EL PERICO ST OPP LOT 23 . 441' EL GAVILAN CT OPP LOT 24 310' EL GAVILAN CT OPP LOT.23 315' EL GAVILAN CT OPP LOT 78 320' EL GAVILAN CT OPP LOT 325' 125 EL GAVILAN, CT OPP LOT 126 123 330' EL GAVILAN CT OPP LOT 330' EL GAVILAN CT OPP LOT 335' EL GAVILAN CT OPP LOT 335' 125 123 11.7 14.9 14.3 11.7 14.3 11.1 12.3 14.3 11.7 15.6 12.3 14.3 14.9 12.3 13.0 13.0 14.3 13.0 13.6 14.3 14.3 107.3 106.9 107.0 110.5 107.2 104.2 106.2 106.3 105.0 110.2 106.3 105.7 105.0 105.8 104.9 107.0 106.0 108.0 109.0 106.2 106.0 118.0 118.0 114.0 118.0 118.0 114;O 114.5 114.5 114.5 .. 115.0 114.5 114.5 114.0 115.0 115.0 115.0 115.0 115.0 . 115.0 115.0 115.0 91 .o 90.5 93.8 93.6 91 .o 91.5 92.7 92.8 91.7 95.6 92.9 92.3 92.1 91.9 91.3 93.0 ,92.0 94.0 94.7 92.5 92.3 COMPACTION TEST RESULTS JOE NCYE ,. CARILLO ESTATES UNIT #1 JOB NUMBER 77-105-9F (STREETS) DATES~OVERED March 17, 1977 through July 20, 1977 PAGE 5-3 OF S-3 JUNE 6 " . -._ JUNE 7 JUNE 9 JUNE 20 JUNE 22 JUNE 23 JUNE 30 JULY 5 JULY 20 s-49 S-50 S-51 - S-52 s-53 s-54 s-55 S-56 s-57 s-58 s-59 S-60 S-61 S-62 S-63 5-64 S-65 5-66 5-67 5-68 S-69 S- 70 5-71 S-72 5-73 EL GAVILAN CT OPP LOT EL GAVILAN CT OPP LOT GAVIOTA LN OPP LOT 76 EL GAVILAN CT OPP LOT EL GAVILAN CT OPP LOT LA PALOMA ST OPP LOT LA PALOMA ST OPP LOT LA PALOMA ST OPP LOT 79 CAYENNE LN OPP LOT 112 CAYENNE LN OPP LOT 113 CAYENNE LN OPP LOT 109 CAYENNE LN OPP LOT 106 CAYENNE LN OPP LOT 107 CAYENNE LN OPP LOT 111 CAYENNE LN OPP COT 99 128 77 127 124 121 118 CAYENNE LN OPP LOT 101 CAYENNE LN OPP LOT 104 GAVIOTA LN OPP LOT 129 EL GAVILAN CT OPP LOT 79 EL GAVILAN CT OPP LOT 76 EL GAVILAN CT OPP LOT 126 .- - GAVIOTA LN OPP LOT 75 GAVIOTA LN OPP LOT 129 GAVIOTA LN OPP LOT 130 GAVIOTA Lri OPP LOT 132 340' 340' 345' 345' 345' 345' 350' 350' 342' 347 ' 347 ' 347' 352' 352' 354' 356' 355' 350' 350 ' 349' 354 ' 355' 360' 384' 370' 13.0 13.0 13.6 13.6 14.9 13.6 11.7 12.3 13.0 12.3 13.0 11.7 15.6 14.3 14.9 18.3 18.3 13.0 14.3 15.6 13.0 77.7 13.6 12.3 14.3 108.5 106.2 110.0 107.2 104.0 105.8 105.0 106.3 105.4 106.5 105.5 108.1 106.7 106.3 104.5 103.8 104.9 106.9 104.6 103.8 107.9 108.3 106.2 108.4 106.0 115.0 115.0 115.0 115.0 115.0 115.0 115.'0 115.0 315i0 115.0 115..0 115.0 115.0 115.0 115.0 111.5 111.5 ,115.0 115.0 115.0 115.0 115.0 115.0 115.0 115.0 94.4 92.5 95.5 93.3 90.5 92.0 91.1 92.5 91.5. 92.6 91.6 94.0 92.7 92.5 91 .o 93.0 94.0 93.0 91 .o 90.3 93.7 94.2 '.'* ..92 .5 94.3 92.2 .. COMPACTION TEST RESULTS JOB NaME '. ,CARILL0 ESTATES UNIT #1 JO~ NUMBER 77-1 May 13, 1977 through July 20, 1977 PAGE 1 OF MAY 13 317 318 31 9 320 .. . MAY 17 MAY 18 MAY 19 322 323 324 325 326 327 328 329 330 331 332 333 334 336 335 337 338 339 340 341 342 343 344 MAY 20 346 347 348 349 350 MAY 23 351 352 353 354 . ' 355 LOT 106 LOT 108 LOT 107 LOT 109 LOT 106 LOT 108 LOT 126 LOT 125 LOT 126 LOT 126 LOT 124 LOT 124 LOT 125 LOT 124 LOT 126 LOT 107 LOT 109 LOT 106 LOT 111 LOT 108 LOT 110 LOT 112 LOT, 114 LOT 125 LOT 126 LOT 127 LOT 125 LOT 107 . ~. .-. . LOT 109 LOT 111 LOT 113 LOT 115 LOT 114 ' LOT 112 LOT 110 LOT 108 LOT 106 LOT 107 LOT 109 283 ' 288' 283 ' 288' 292' 292' 280 ' 285' 285 ' 290' 290' 294' 294' 299' 299' 297' 297 ' 297 ' 301 ' 301 ' 301 ' 301 ' 301 ' 304 ' 304' 309' 309 ' 306 ' 306' 306' 306' 306' 311 ' 311 ' 311 ' 311 ' 311 ' 316' 316' 14.3 1413 12.3 13.0 13.0 12.3 13.0 12.3 13.0 14.9 13.6 14.3 13.6 14.9 14.9 14.3 13.6 14.3 13.6 13.0 13.0 14.3 14.3 13.6 14.3 13.0 13.0 12.3 14.3 13.6 13.6 14.9 13.0 14.3 13.6 13.0 13.0 14.9 13.0 105.7 105.1 106.3 106.4 112.9 105.9 106.2 103.5 105.1 106.0 105.0 105.8 106.0 104.0 105.6 106.2 110.0 107.2 106.9 109.0 108.0 107.0 105.9 107.2 106.5 105.0 108.2 105.3 105.1 107.9 108.0 107.6 105.1 106.1 106.0 106.7 107.8 106.9 107.7 114.5 114.5 114.5 114.5 119.5 115.0 115.0 115.0 115.0 115.0 115.0 115.0 115.0 7 1 5 .-0 115.0 115,O 115.0 115.0 115.0 115.0 115.0 115.0 115.0 115.0 115.0 115.0 '115.0 115.0 115.0 115.0 115.0 115.0 115.0 115.0 115.0 115.0 115.0 115.0 115.0 92.3 91.9 92.9 93.0 94.3 92.0 92.5 91.4 94.4 92.3 91.3 92.3 92.0 90.5 91.6 92.5 95.6 93.2 94.7 94.0 92.8 93.0 92.0 92.5 93.3 91.3 94.4 91.6 91.5 93.9 94.0 93.5 91.5 92.4 92.1 92.6 93.6 93 .O 93.5 .. COMPACTION TEST RESULTS J0'. NAME.' . CARILLO ESTATES UNIT #1 u*TERwoRrEo August 5, 1977 JOB NUMBER 77-105-9F - DATE.~OVERED May 13, 1977 through July 20, 1977 PAGE OF 7 MAY 25 356 357 358 359 - - 360 - -.c - MAY 26 .. . . MAY 31 JUNE 1 JUNE 2 JUNE 3 .. ..- . 384 * 361 362 363 364 . ~. 365 366 367 370 369 371 372 373 374 376 375 377 378 379 380 382 368 381 383 385 386 387 JUNE 6 388 389 391 390 LOT 111 LOT 113 LOT 115 LOT 78 LOT 126 LOT 124 LOT 121 LOT 127 LOT 125 LOT 123 LOT 121 LOT 78 LOT 126 LOT 124 LOT 122 LOT 79 LOT 77 LOT 127 LOT 78 LOT 125 LOT 123 LOT 121 LOT 77 LOT 79 LOT 80 LOT 128 LOT 126 LOT 124 316' 13.0 106.1 115.0 92.4 316' 13.0 106.7 115.0 92.6 316' 15.6 107.9 115.0 93.7 314' 13.6 110.6 115.0' 96.2 314' 13.6 108.0 115.0 93.8 314' 314' 319' 319' 319' 319' 319' 324' 324' 324' 324 ' 324' 329' 329' 329' 329' 329' 334' 334' 334' 334' 334 ' 334' 14.9 12.3 13.0 13.0 13.6 14.9 13.0 14.3 14.3 12.3 13.6 14.3 13.0 14.9 11.7 14.3 12.3 13.0 14.3 14.9 14.3 13.6 13.0 106.0 105.9 104.8 107.8 104.7 105.2 107.0 104.7 104.7 108.7 105.8 106.8 105.0 105.0 107.5 106.0 104.0 106.1 106.9 105.8 106.2 I 106.9 108.8 115.0 92.2 115.0 92.0 115.0 91.2 115.0 115.0 91.1 93.6 115.0 91.5 115.0 115.0 93.0 91 .o $15.0 91 .o 115.0 92.0 li5.0 94.4 115.0 92.8 115.0 115.0 91.3 91.3 115.0 94.5 115.0 93.5 115.0 92.2 115.0 115.0 90.5 115.0 92.3 92.7 115.0 115.0 92.0 92.5 115.0 92.7 LOT 122 334' 12.3 108.3 115.0 LOT 120 334' 12.3 108.4 115.0 94.2 '. LOT 76 339' 13.0 105.1 115.0 , 91.4 94.3 ,... .. LOT 78 339' 14.3 106.0 115.0 92.2 LOT 81 LOT 127 LOT 125 339' 12.3 107.7 115.0 93.5 339' 11.7 108.3 115.0 94.2 339' 12.3 106.8 115.0 92.7 LOT 123 339' 14.9 105.7 115.0 91.9 392 LOT 121 339' 15.6 103.7 115.0 90.2 ., COMPACTION TEST RESULTS JOON-E ' CARILLO ESTATES UNIT #1 DATE REPORTED August 5, 1977 JOO NUMOER 77-105-9F - DATES~OVERED May 13, 1977 through July 20, 1977 PAGE 3 OF 7 JUNE 7 393 394 395 396 - - 397 - - 398 399 400 ~ "C JUNE 8 JUNE 9 JUNE 10 JUNE 15 JUNE 16 401 403 402 404 405 406 407 408 409 41 1 41 0 41 2 41 3 41 4 41 5 41 6 41 7 41 8 41 9 420 421 422 . 423 424 425 - 426 428 427 430 429 431 . . 432 433 434 LOT 128 LOT 126 LOT 124 LOT 122 LOT 120 LOT 77 LOT 79 LOT 80 LOT 106 LOT 110 LOT 103 LOT 112 LOT 114 LOT 116 LOT 107 LOT 109 LOT 111 LOT 113 LOT 115 LOT 106 LOT 108 LOT 110 LOT 112 LOT 114 LOT 116 LOT 100 LOT 99 LOT 101 LOT 107 LOT 109 LOT 113 LOT 111 LOT 115 LOT 117 LOT 106 LOT 108 LOT 110 LOT 112 LOT 114 LOT 116 LOT 119 LOT 107 344' 13.0 105.1 115.0 91.5 344 ' 13.0 107.0 115.0 93.0 344' 13.6 105.2 115.0 91.6 344' 12.3 110.0 115.0 95.6 344' 11.1 108.9 115.0 94.6 344' 344 ' 12.3 106.0 115.0 92.3 13.0 107.9 115.0 93.7 344 ' 12.3 105.9 115.0 92.0 321 ' 321 ' 321 ' 321 ' 321 ' 321 ' 326' 326' 326' 326' 326' 331 ' 331 ' 331 ' 331 ' 331 ' 331 ' 453' 456' 456' 336' 336 ' 336' 336' 336 ' 336' 341 ' 341 ' .341' 341 ' 341 ' 341 ' 341 ' 346 ' 13.0 13.0 14.9 12.3 13.0 11.7 12.3 12.3 13.0 13.0 11.1 12.3 11.7 13.6 13.0 11.7 15.6 12.3 14.3 14.3 13.6 13.6 14.3 13.0 14.9 13.0 13.6 14.3 14.9 13.6 13.6 15.6 13.6 13.6 105.8 108.4 105.0 107.9 107.8 108.1 108.0 105.5 106.1 105.3 107.1 105.0 106.3 104.8 105.4 107.2 104.9 106.5 107.5 104.7 105.2 105.8 105.7 105.5 106.2 106.2 105.3 105.5 107.1 106.3 107.1 109.1 106.6 107.9 115.0 115.0 115.0 115.0 115.c 115.0 115:O 115.0 115.0 115.0 115.0 115.0 115.0 115.0 115.0 115.0 115.0 115.0 115.0 . 115.0 115.0 115.0 114.5 115.0 114.5 114.5 115.0 115.0 115.0 115.0 115.0 115.0 115.0 115.0 .. - 92.0 94.3 91.1 93.8 93.6 94.0 93.9 92.4 91.6 91.5 93.3 92.5 91.1 91.5 91.2 93.4 92.6 91.3 93.5 91 .o 91.5 92.0 91.9 ; 92.2 92.7 92.7 91.7 91.6 93.1 92.4 93.1 94.9 93.9 92.7 COMPACTION TEST RESULTS JOB NAYE'' . CARILLO ESTATES UNIT #1 DATEREPORTED August 5, 1977 JOB NUMBER 77-105-9F - DATEsCoVERED May 13, 1977 through July 20, 1977 PAGE OF 7 JUNE 17 435 436 437 " 438 . "- 439 - - 440 JUNE 20 JUNE 21 JUNE 22 JUNE 23 JUNE 24 .., , - . JUNE 27 441 442 443 444 445 446 447 448 449 450 451 452 453 454 455 456 457 458 459 460 461 462 463 464 465 466 467 468 469 470 LOT 109 LOT 111 LOT 113 LOT 115 LOT 117 LOT 120 LOT 95 LOT 95 LOT 81 LOT 80 LOT 82 LOT 106 LOT 108 LOT 110 LOT 112 LOT 114 LOT 116 LOT 119 LOT 107 LOT 109 LOT 111 LOT 113 LOT 115 LOT 117 LOT 120 LOT 106 LOT 108 LOT 110 LOT 112 LOT 107 LOT 81 LOT 80 LOT 81 LOT 82 LOT 95 LOT 94 346 ' 14.3 107.7. 115.0 93.7 346 ' 15.6 107.5 115.0 93.5 346' 14.3 106.7 114.5 93.1 346 ' 14.3 107.6 114.5 94.0 346' 13.6 108.8 115.0 94.6 346' 14.3 106.5 114.5 93 .O 346' 349' 12.3 346' 14.3 13.0 349' 349' 13.0 17.6 349' 349' 14.9 349' 18.3 349' 17.6 349' 18.3 16.9 349 ' 14.9 349' 14.9 353' 15.6 353' 353' 12.3 14.3 353' 353' 14.9 353 ' 19.0 17.6 353' 356 ' 15.6 15.6 356' 11.7 .,.,,. 356' ... . .,. , 13.6.:~ 356' 358' 14.3 351 ' 11.7 13.0 353' 12.3 353' 13.0 355' 12.3 351 ' 11.1 355' 13.0 106.0 104.6 108.5 106.9 107.0 105.0 104.9 104.1 103.8 105.0 104.5 106.1 106.7 106.6 106.3 102.5 104.5 104.0 103.5 103.2 106.6 105.8". 107.0 107.3 105.0 106.0 106.0 105.0 105.2 106.9 115.0 115.0 115.0 115.0 111.5 111.5 .l11'.5 111.5 111.5 111.5 115.0 115.0 115.0 115.0 115.0 111.5 111.5 111..5 71 1.5 .111.5 115.0 115.0 115.0 115.0 115.0 115.0 115.0 115.0 115.0 115.0 92.0 91 .o 94.1 93.0 95.9 94.0 94.0 93.4 93.0 94.1 93.6 92.2 92.8 92.7 92.5 91 .o 92.0 93.3 92.7 92.5 92.6 92.0 93.0 41.5 93.5 92.2 92.1 91.4 92.9 91.5 COMPACTION TEST RESULTS Jon N6YE ' CARILLO ESTATES UNIT #1 DATEREPORTED August 5, 1977 J~~ NUUSER 77-105-9F - DATESCOVERED May 13, 1977 through July 20, 1977 PAGE 5 OF 7 JUNE 28 471 472 473 474 " 47 5 - -~" " JUNE 29 JUNE 30 JULY 1 JULY 5 JULY 6 JULY 7 476 477 478 479 480 481 482 483 484 485 486 487 488 489 490 491 492 494 493 495 496 497 498 499 500 501 502 503 504 505 LOT 82 LOT 118 LOT 129 LOT 125 LOT 127 LOT 123 LOT 121 LOT 76 LOT 128 LOT 75 LOT 126 LOT 124 LOT 122 LOT 76 LOT 129 LOT 127 LOT 125 LOT 123 LOT 75 LOT 121 LOT 130 LOT 128 LOT 126 LOT 129 LOT 127 LOT 76 LOT 75 LOT 130 LOT 129 LOT 76 LOT 74 ". . . LOT 130 LOT 75 " LOT 131 LOT 130 358' 351 ' 346 ' 346 ' 346 ' 346' 346' 346 ' 349' - 352' 349' 349' 349' 352' 352' 352' 352' 352' 352' 356' 356' 356' 355' 358' 357' 358' 360' 360' 363' 363' 366' 366' 369' .372' 369' 14.9 13.0 13.0 12.3 13.0 13.0 11.7 11.1 11.9 15.6 12.3 13.0 12.3 11.7 15.6 11.7 13.6 11.7 14.3 11.1 13.0 16.9 12.3 16.3 11.7 12.3 14.9 12.3 13.6 14.3 12.3 11.7 12.3 13.0 13.6 105.9 105.9 107.1 107.3 107.0 105.8 110.6 104.0 110.2 108.7 106.2 104.9 105.0 110.2 106.3 104.2 104.1 105.1 106.3 106.9 104.6 109.9 106.9 106.1 104.3 103.8 104.8 106.9 105.2 104.8 106.2 108.7 108.5 106.8 106.9 115.0 115.0 i15.0 115.0 115.0 115.0 115.0 115.0 115.0 115.0 114.0 114.0 114.0 "314.0 115.0 115.0 115.0 115.0 114.0 114.0 114.0 114.0 114.0 114.0 114.0 ' 114.0 114.0 114.0 114.0 114.0 115.0 115.0 115.0 115.0 115.0 92.0 92.0 93.1 93.4 93 .O 91.9 96.2 90.5 94.4 95.9 93.3 92 .O 92.0 93.3 95.9 90.6 91.5 90.5 93.7 93.4 91.8 96.4 93.7 93.1 91.6 91 .o 91.9 93.6 92.4 92.0 92.5 94.4 94.3 92.9 93.0 COMPACTION TEST RESULTS JOB N&ut. CfiRILLO ESTATES UNIT #1 JOB NUMBER 77-105-9F DITE~~OVERED May 13. 1977 through July 20, 1977 PAGE 6 OF 7 JULY 8 506 ,507 508 509 51 0 . -c " " JULY 11 JULY 12 JULY 13 JULY 14 JULY. 15 51 1 51 2 51 3 51 4 51 5 516 51 7 519 520 521 522 523 524 525 527 526 528 529 530 531 532 533 534 535 536 . 537 538 539 540 518 LOT 74 LOT 131 LOT 74 LOT 132 LOT 73 LOT 132 LOT 133 LOT 105 LOT 134 LOT 104 LOT 103 LOT 106 LOT 107 LOT 108 LOT 109 LOT 110 LOT 111 LOT 112 LOT 113 LOT 114 LOT 116 LOT 115 LOT 117 LOT 118 LOT 120 LOT 119 LOT 102 LOT 101 LOT 100 LOT 99 LOT 98 LOT 97 LOT 93 LOT 94 LOT 96 FG FG FG FG FG FG FG FG FG FG FG FG FG FG FG FG FG FG FG FG FG FG FG FG ' FG FG FG 373' 376' 377' 330 ' 384' 390' 384' 393 ' 359.3' 359.3' 358.9' 359.3' 359.3' 358.4' 358.9' 358.0' 357.5' 357.0' 356.7' 356.2' 355.8' 355.5' 355.2' 353.8' 353.9' 354.0' 358.41 358.0' 357.5' 357.0' 356.5' 354.7' 360.3 357.4' 354.3' 13.6 11.1 13.6 11.7 14.3 13.0 11.1 11.7 13.0 12.3 11.7 13.0 12.3 11.1 13.0 11.7 13.0 1 1 1 1 1 1 1 1 14.9 14.6 14.3 13.6 13.0 12.3 14.9 11.7 11.1 13.0 2.3 3.0 3.0 2.3 2.3 2.3 5.6 1.7 104.8 111.9 105.5 106.0 105.0 105.9 105.0 105.0 105.9 106.0 106.5 107.8 107.7 105.7 103.7 108.0 105.4 105.5 107.9 105.3 106.5 106.1 104.9 108.0 107.2 105.2 104.7 104.0 104.8 108.4 106.3 105.0 105.0 105.9 107.1 115.0 115.0 115.0 115.0 115.0 115.0 115.0 11 ,11' 11 11: 11 11 11 5.0 5.0 5.0 5.0 5.0 5.0 5:O 115..0 115.0 115.0 115.0 115.0 115.0 115.0 115.0 115.0 115.0 115.0 115.0 115.0 115.0 115.0 1 1 1 15.0 15.0 15.0 15.0 15.0 15.0 91 .o 97.2 91.6 92.3 91.4 92.2 91.4 91.2 92.0 92.3 92.6 93.7 93.6 91.9 94.4 94.0 91.5 93.8 91.6 91.5 92.6 92.4 91.3 93.9 93.4 91.5 91 .o 90. 5 91.2 94.3 *'92.5 91.1 91.1 92.0 93.2 COMPACTION TEST RESULTS JO~ NIUE'. . CARILLO ESTATES UNIT #1 JOB NUMBER 77-105-9F DATEBIZOVERED May 13, 1977 through July 20, 1977 544 . L 545 -- - 546 548 547 . "- JULY 19 549 550 551 552 553 554 555 556 JULY 20 557 558 559 560 561 562 563 564 565 566 570 571 LOT 95 FG LOT 80 LOT 81 FG FG LOT 82 FG LOT 83 FG LOT 121 FG LOT 123 LOT 122 FG FG LOT 124 FG LOT 125 FG LOT 126. LOT 127 FG FG LOT 128 LOT 129 LOT 139 FG FG FG LOT 131 FG LOT 132 LOT 133 LOT 134 FG FG FG LOT 76 FG LOT 75 LOT 74 LOT 73 LOT 72 LOT 71 LOT 78 LOT 77 LOT 79 LOT 79 FG FG FG FG FG FG LOT 78 FG FG . .- LOT: -. 77 ... ..... , (. ~. . , .~ 353.3' 356.2' 358.1' 360.5' 362.9' 354.1' 353.6' 353.1 ' 353.3' 355.5' 357.2' 358.5' 360.7' 366.7' 374.4' 382.5' 388.9' 392.7' 395.1' 364.1' 371 .5' 379.1' 386.5' 391.5' 394.7' 347 ' 350' 350' 351.4' 353.2' 353.4' 13.0 14.3 14.3 13.0 14.9 14.9 15.6 14.3 14.3 14.9 13.6 13.0 12.3 13.0 14.3 13.6 14.9 14.3 13.0 14.9 14.9 13.6 12.3 14.9 14.3 13.0 14.3 12.3 13.6 13.6 14.9 106.0 104.9 107.9 106.9 104.7 106.0 107.2 110.0 108.7 107.8 108.0 106.7 107.0 105.5 105.2 105.8 105.7 106.5 107.9, 105.0 111.5 109.0 109.3 106.7 106.5 107.0 104.2 106.9 104.8 105.7 105.7 115.0 115.0 115.0 115.0 115.0 115.0 115.0 115.0 115.0 115.0 115.0 115.0 115.0 115.0 '1 1 5.0 115.0 115.0 115.0 115.0 115.0 115.0 115.0 115.0 115.0 115.0 1 1 1 '' 1 1 1 1 5.0 5.0 5.0 5.0 5.0 5.0 92.3 91.2 93.7 91 .o 93.0 92.3 95.7 91.2 94.4 93.6 94.0 92.6 93.1 91.7 92.0 91.5 92.6 91.9 93.6 91.4 96.9 94.7 95.3 92.6 92.5 93.1 90.7 92.7 91.2 91.9 91.9 - I PLASTICITY CHARACTERISTICS~ 1 I 1 I 150 ZERO AIR VOIDS CURVES - :- 140 - CORBLES GRAVEL] S:.I(D CLAY Itlcjml I 100 (3 z 80 ._ ul v) 2 60 I- Z w 40 0 cc E 20 0 1000 100 10 1.0 0.1 0.01 0.001 GRAIN SIZE, mm MECHANICAL ANALYSIS DIRECT SHEAR TEST DATA Final Water Content. % Apparent Cohesion. psf 260 320 420 Apparent Frictlon Angle. degrees 27 9 15 - . .LABORATORY COMPACTION TEST . ' . .. .. . - ". FILL SUITABILITY TESTS I .. CARILLO 'ESTATES UNIT 1 DFIAWN BY: I*liit; I CHECKED BYd// I PROJECTNO: 77-105-9 I DATE: 3-16-77 I FIGURENO: 4 I- ?.. ~ ..; . ' . . .: ._ WUODWARD.CLY0E COKSULTRF!TS .. . ... .~ : : , : - .," . .,. .. . . .: I , .,>.".. _.'( .. 1 2( 1 If 1 101 9c GRAIN SIZE, mrn MECHANICAL ANALYSIS DIRECT SHEAR TEST DATA I ' II Ory Density, pcf 103 Initial Water Content, Yo 16 Finil Water Content. 06 Apparent Cohesion, psf 340 . Apparenl Friction Angle. degrees 36 io ' SWELL TEST DATA 4 I I Initial Dry Density. pcf I101 I Initial Water Content. ?& I 1A I Final Dry Density. pcf I101 I , .., , I Final Water Content. % 22 Load. psf .' ' ~' ' Swell. percent 0.8 " 160 . .. FILL SUITABILITY TESTS ,. .. - CARRILLO ESTATES UrIIT 1, . ". . .. ., D~AWNOY: MU& I CHECKED IIY&'{ 1 PROJECTNO: 77-105-9F I DATE: 3-16-77 1 FIGURE NO: ~ , WOODVIARO-CLYDE CONSULTAMTS .. .. - PLASTICITY CHARACTERISTICS 5 Llquid Limit, % 33 Plasticity Index. % Classification by Unlfled Soil Clasrificatlon System COBBLES 1 , I I GRAVEL 1 , SAND { SILT 6 CLAY ., " GRAIN SIZE. mm MECHANICAL ANALYSIS . LABORATORY COMPACTION TEST . FILL SUITABILITY TESTS . . CARILLO ESTATES UNIT 1 .. . DRAWNEY&) CHECKEDBY: EIIP/ PROJECTNO: 77-105-9F I DATE: 5-12-77 I FIGURENO -1 .. . WOODWARD-CLYDE CONSULTANTS . ' ., _* ., .~ , ., . PLASTICITY CHARACTERISTICS 6 COBBLES 1 1 c~ 1 1 i { SILT 6 CLAY Liquid Limit, % Plasticltv Index. % Classification by Unified Soil Classification System ZERO AIR VOIDSCURVES GRAIN SIZE, mrn MECHANICAL ANALYSIS ... : * LABORATORY COMPACTION TEST .: ' . .. . .. . .. ._ .. .. .,?,., _,.~. . FILL SUITABILITY TESTS ,. . . ?~: ~ -... '~ . I( , .~ , . .~. " .. -: I DATE: 5-12-77 FIGURE NO 2 WOODWARD-CLYDE CONSULTANTS 1 51 r PLASTICITY CHARACTERISTICS 7 8 COBBLES rn I 1 GRAVELl 1 SILT 6 CLAY - Liquid Limit, % 31 31 Plasticity Index. % 7 '8 100 Classiflcation by Unified Soil Classification System SM SM g - 80 2 60 t- z w 40 0 a ln -ln 3 ZERO AIR VOIDSCURVES !2 20 2.80 SG n 1 3( 11c 1 oc 9c 80 iooo 100 IO 1.0 0.1 0.01 0.001 GRAIN SIZE, rnm MECHANICAL ANALYSIS SWELL TEST DATA 7. 8 I Initial Dry Density. pcf 103 102 Initial Water Content, % 16 14 Final Dry Density, pcf 102 101 Final Water Content. % 22 21 " Load, tnf 160 ' 160 Swell, percent 0.6 1.4 SAMPLE LOCATION , . I 7 I Cut Arm Borrow Pit 8 1 Lot 109 I I I 1 LABORATORY C%MfjTI,C#,-70A TEST METHOD: .. SHEAR DISPLACEMENT. inches I SWPLE DATA 1 I Smnple NO: 14 - I 1 Classification: Height. inches 0.807 Diameter. inches Initial Conditions: Dry Density. pcf 100.9 Hoisture Content. 5 IY.9 After Soaking: Dry Density. pcf 103.3 Moisture Content. % Surcharge during soaking: r , t0nSlsq.ft. TEST DATA 1 Angle of Friction. degrees 31 Cohesion. psf 450 - NORMAL STRESS, 1 ., .c .. ..... DIRECT SHEAR TEST .. tonslsq.ft. . .j -i ..... ......... _. . <. ., . .. .... .. , ., .. ,I , ' .. .. CARRI LLO ESTATES ,I ._ . WOCWARD - GIZIENSKI & ASSOCIATES CONSULTING s0.1~ AND FOUNDATION ENGINEERS AND GEOLOGISTS ., . SAn OIEGO, CALIFORNIA DR. BY: ALS IAPPROX. SCALE: - - - IPROJ. NO: 73-203 CK'D BY: & IDATE: 8-15-73 IFIGURE NO: 21 .. . .. y SWPLE DATA Sample No: II - 2 Classification: Height. inches Diameter. inches Initial Conditions: Dry Density. pcf 105.2 Moisture Content. X 14.6 * After Saaking: Dry Density. pcf 106.6 Moisture Content. Z 1 13.9 Surcharge during snaking:. tons/sq.ft. I TEST DATA I I Angle of Friction. degrees1 23 I - 0 .02 .04 .06 -08 -10 -12 914 Cohesion. psf 410 ~ 1 SHEAR Dl SPLACWENT. inches 0.5 1.0 1.5 ,I 2.0 NORMAL STRESS, tons/sq.ft. F DIRECT SHEAR TEST . . , , .. .. ., . 2 , :' i ., . ~ .. .~ .~ .... .,.... CARR I LLO ESTATES . ,' '. .. ., : ., ' ' : : ,. .,;., > .. . , . ..j. ., .. ..~ . . WOOWARD - GI Zl ENSKI & ASSOCIATES .;.. .'. .. ", 1. CONSULTING SOIL AND FOUNDATION EHGINEERS AND GEOLOGISTS . . .. : . . .. . ... , %, . Shn DIEGO, CALIFORNIA .,. , . " I .: .. . DR. BY: ALS IAPPROX. SCALE: - - - IPROJ. NO: 7x33 CKTI BY:%~DATE: 8-1573 IFIGURE NO: 20 ... . - .. .. ,. -. x : .t :' . i :. . ., . .$... 0 so3 -06 .09 .I2 .I5 .I8 SHEAR DISPLACEMENT. inches - SWPLE DATA 1 Classification: Sample No: 3 - 3 Height. inches 0.807 Diameter. inches Initial Conditions: Dry Density. pcf I 11.6 Moisture Content. $ 9.0 After Soakina: Dry Density. pcf 114.3 Moisture Content. % 1 7.6 Surcharge during soaking: tons'/sq.ft. I TEST DATA Angle of Friction. degrees 28 Cohesion. osf I 500 0 .. ..I ,. 1.0 , . ,. 2.0 NORMAL STRESS, .. . .' ,., ~ ?8.,:*:.:,;.2: ' - ..:*I , i-* '. DIRECT SHEAR TEST .. .. ..., , ,& ~. .. ,: . . ,n:*..:..;r ._ <:::?. . ~ ... CARRILLO ESTATES - . ..l. ,.? . , I , . I ' -. WODWARD - GIZIENSKI & ASSOCIATES DR. BY: ALS IAPPROX. SCALE: - - - IPROJ. NO: 73-203 CKV BY:%]DATE: 8-15-73 IFIGURE NO: 19 CONSULTING SOIL'AND FOUNDATION ENGINEERS AWD.GEOLOGISTS . ..-. SAN DIEGO. CALIFORNIA " .02 .04 -0.5 .08 0.10 0.12 SHEAR.DISPLACMNT. inches SWPLE DATA I Sample NO: 2 - 5 , 1 Classification: Height. inches 0.807 Diameter. inches 1.99 Initial Conditions: Dry Density. pcf 107.0 Moisture Content. 5 13.7 After Soaking: Dry Density. pcf 107.8 1 Surcharge during =:king: . ton.slsq.ft. I TEST DATA I Angle of Friction. degrees . 25 Cohesion. psf 350 ,. ... . , ' DIRECT SHEAR TEST..'";.'.''. ~. 1 . $$ '' - ., ~ .. .. -, ,, .. , I .~ ,/ ., .. . , ': . ' .. CARRILLO 'ESTATES :.,..,,::!: .. ,.. ... .. , .. . ., ... I , ,.~- . . , . .. . .. .. . MOWARD - GlZl ENSKI h ASSOCIATES +&&+.. .. ~.. DR. BY: ALS IAPPROX. SCALE: - - - IPROJ. NO: 73-213 . .~. . .. .. .. CONSULTING SOIL AND FOUNDATION WGINEERS AND GEOLOGISTS-. ,, . . I SbN DIEGO, CALIFORNIA '".' ' ' ~ ,. . .x. .. .. .. . . . .. .. : . . . ,. 1 i