Loading...
HomeMy WebLinkAboutCT 73-39; Spinnaker Hills; Soils Report; 1976-10-29CT 73-39 - GEOCON ENGINEERS AND GEOLOGISTS * CONSULTANTS IN THE APPLIED EARTH SCIENCES " INCORPORATED - File No. D-0630-SO1 October 29, 1976 - Standard Pacific of San Diego 7670 Clairemont Mesa Boulevard San Diego, California 92111 Attention: Mr. Robert Allan Subject : Spinnaker Hills Units 1 & 2 TESTING AND OBSERVATION SERVICES Carlsbad, California DURING GRADING OPERATIONS FIRST REPORT OF WORK FROM 8f20f 76 - 1Of 29f 76 LOTS 23, 24, 25 & 26 Gentlemen: In accordance with your authorization, our firm is performing testing and observation services during grading operations on the subject project. Grading commenced with a clearing of surface organics, debris, and other deleterious material from the area to be graded. The then exposed ground surface which was to receive fill was pro- perly benched, scarified, moisture-conditioned, and recompacted in accordance with the project specifications and recornendations contained in the report of Soil Investigation prepared by Southern California Testing Laboratory, dated September 25, 1973. In-place density tests performed by ow firm indicated relative D1557-70, Method C. Fill derived from on-site cutting operations compactions of at least 90%, based upon ASTM Compaction Test was then placed in compacted layers until final elevations were reached. Grading operations for the subject lots have been com- pleted; however, grading for the remainder of the site has not. The soils exposed on the subject building pads are classified as being non-expansive. As such, no foundation or interior concrete slab-on-grade reinforcement is required. - - - 6645 CONVOY COURT SAN DIEGO, CALIFORNIA 92111 PHONE (714) 292-5100 , File No. D-0630-SO1 October 29, 1976 We will submit the results of laboratory and field tests with our final report of grading operations. Very truly yours, copies : (4) addressee