HomeMy WebLinkAboutCT 73-08; CARLSBAD PALISADES; SOIL INVESTIGATION FOR THE PROPOSED RANCHO AGUA HEDIONDA; 1973-03-03''l, , '. ' 7' 1-'}\ , ' ;;.:::' ---~ - SOIL INVESTIGATION FOR THE PROPOSED RANCHO AGUA HEDIONDA -63 ACRE SITE CARLSBAD, CALI FORNIA for Dougl as Pad fi c Corporat; on Post Office Box 1207 San Clemente, California 92672 by WOODWARD-GIZIENSKI & ASSOCIATES Consulting Soil and Foundation Engineers .and Geologi-s(s (An Affiliate of Woodward-Clyde Consultants) : 1 1 I t i' • TRANSMITTAL tiE:TTER SCOPE FIELD INVESTIGATION LABORATORY TESTS TABL'E OF CONTENTS SITE, SOIL AND GEOLOGIC CON~ITIONS Topography and Surface Features D.escriipti on of S.oil and 'Geo 109i.c Units Overburden Soils Quaternary Alluvial Deposits Quaternary Terrace Deposits T.ertiary Marine Sediments Geol~gic Structure Mineral Resources Ground Water RECOMMENDATIONS AND CONCLUSIONS LIMITATIONS FIGURE 1. -. SITE PLAN FIGURE 2 -lOG OF TEST BORING 1 FIGURE 3 -tOG OF TEST BORING 2 FIGURE 4 -LOG OF TEST BORING 2 FIGURE 5 .... LOG OF TEST BORING 3 FIGURE 6 -LOG OF TEST BORING 3 FIGURE 7 -' LOG OF TEST BORING 4 FIGURE 8 -LOG OF TEST BORING 4 FIGURE' 9 -LOG OF TEST BORING 5 fiGURE 10 -LOG OF TEST BORING 6 FIGURE 11 ... LOGS OF TEST BORINGS 7 AND 8 --------~-----.--- ... Page 1 2 2 3 3 4 6 7 8 8 12 . t , . .... '. FIGURE 12 ... LOG OF TEST BORING 9 FIGURE 13 -LOG OF TEST BORING 10 FIGURE 14 -LOG OF TEST BORING 11 FIGURE 15 -GRAIN SIZE DISTRIBUTION CURVES .. FIGURE 16 -FILL SUITABILITY TESTS FIGURE 17 -RESULTS OF LOADED SWELL TESTS ATTACHMENT I -STABILITY ANALYSIS ~ • ATTACHMENT II -SPECIFICATIONS FOR CONTROLLED FILL .' , .. .... '.. • r , . .. -. ... ,.' • • CONSULTING SOIL AND FOUNDATION ENGINEERS AND GEOLOGISTS 3467 :Ku rt,z 'Street Sa" Die&,o C.Jifornill 921'10 (71") 224-2?1l An affiliate of Woodward -(Jlyde Consultants March 3, 1973 Project No. 73-130 Douglas Pacific Corporation Post Office Box 1207 San Clemente, California 92672 Attention: Mr. Jerry J. Johnston In accordance with your request and letter dated February 1, 1973, we have investigated the existing soil and geologic conditions at the site of a proposed subdivision to be located on a ~3 acre site in Rancho Agua Hedionda, Carls'bad, California. The accompanying report represents the results of this subsurface exploration and the laboratory tests, as well as the conclusions and recolmlendati ons pertai'ni n9 to thi s si teo The engineer assigned to this project is Richard P. While of our firm. WOODWARI)-GIZIENSKI & ASSOCIATES . ro, Lbuis J. L~ R.E. 29 RPW/LJL/mf (26) Douglas Pacific Corporation (1) Environmental Impact Profiles Attention: 'Mr. Bfollansdee I _ __...._-----. ..... __ v ..... _ " ___ .. -• -• __ ~~~ __ •• -..... _.... • .-_ ••• ' .. • ". SCOPE Thi.s report describes an invest; gati on of the ~urfaGe and . underlying soil and geologic conditions at the site of a proposed. s'ubd;vision to be located on.a 63 acre parcel in Rancho Agua Hedionda. The site is situated between Skyline Road and E1 Camino Real aDd east of the terminus of Birch and McArthur Avenues in Carlsbad, Calif- ornia. The purpose of the ;nv~stigati.on is to determine the surface and subsurface soil condi ti o~s, inc1 uding the presence and effect of fillS, loose or porous soils and potentia11y expansive soils, the· availability of select fill material 'and the characteristics of exca- vation in the proposed .. cu~ area; to make recommend'ations regarding grading including any required t·rea:tment of fill foundations, loose or porous soil s, the potenti ally. expansive soils , the requi rement of .:bl.as.ting har.d :r.D,ck., if .. any .. the .amount of compaction required in the fills, and guidelines for the design of cut and fill slopes;. to de- termine the most suitable types and required depths of foundations for the support of the pr,opos'ed structures and the allowable soil bearing pressures to be used in the design of the foundations on the compacted fill and natural native soil. In addition, comments on minera1 resources, ground water and seismic risk are also presented. It is our understanding that the proposed subdivision is to be limited to residen.tial wood-frame structures supported on con- tinuous footings or a pier and grade-beam foundation with a raised wooden floor or a slab-on-grade floor. At the time of this writing no plans were available designating the pro'posed grading or layout , . of structures. A tentative earthwork distribution plan, a topographic ... WOODWARD· GIZIENSKI & ASSOCIATES COfIlII&.lI'" lOlL AND FOUNDATIOIC ·IfIGINIlQ AND gEOLOGISTS , ., '. • m~,p of th~ :§3 ,~cre site,.~nd ~ road layout were provi,~ed.for our studies. 'A lpre1 imi,naryengineeri:ng and, geol,ogical reconnaissance was made on , , , ," " F¢bruary ~. 1973. the Jresults of which were reported to you in ,a letter dated' February 13, 1973. FIEI,.D INVESTIGATION, During the peri od between February 19 and 21. 1973, four bycket excav,ations and six Small diameter auger test bori-ngs were made ranging in depth from approximately 50 ft to 70 ft and 10 ft to 25 ft, respective1y. below ~he groun~ surface. The bucket excavations were made with a 3D-in. diameter bucket 'auger ,rig and the small diameter borings were made wi~h a 6-;'n. diameter truck-mounted, power auger ~t the approximate locations shown on the Site Plan, Fig. 1. 'The test borings were located in"the field wiih the aid of an undated un~it1ed topographic map of the general a'rea provided us by Douglas Pacific "Corpor~ti"on. The .drilliJng.was .con.d~,cted under the supervision of a prOject geolQg,ist from our firm. Field logs were prepared by the geologist on the basis" of an i'nspection of the samples secured and of the excavated materi al. The Logs of Test Borings shown on Fl gs. 2 . thr,ou~ 14 are bas,ed on a visual inspection of the samples in the laboratory, the laboratory test resu'lts and the field logs. The vertical position of each sample is shown on the Logs of Test Borings. LABORATORV TESTS The soils encountered were visually classified and evaluated with respect to strength, swelli1ng and compressibility characterist.ics, . lstics of 'representative s·amp1es C?f the finer grained soil. F11l . ..... . .". WOODWARD· GIZIENSKI & ASSaCIA'T:ES CilNiul.n ... 1011. NlD 'OUNDAnON IJIIQINIlIII NlD QIOLoe,ISl:" .-. ---~-, . . Project No. 73-l30~ • Page 3 suitability tests, including compaction tests" direct shear tests, expansibility characteristi·cs and'g,rain size analyses were performed . . on samples of the anticipated predominant fill soils. Strength and compressibi1ity characteristics were evaluated by direct shear and un- confined compression tests on selected relatively undisturbed samples and by consideration of the density and moisture content of the samples and the penetration resistance of the sampler. The geologic character- istics of the soils were also considered in this reg~rd. Expansion characteristics were determined by loaded swell tests on undisturbed and compacted samples. The results of the moisture content, dry density, un- confined compression and direct shear tests on relatively undisturbed drive samples are shown with the penetra~ion resistance of the sampler at the corresponding sample location on the Logs of Test Borings. The results of a grain size ana1yses are shown on Fig. 15, -the Tesu1ts of the fill suitability tests a're presented on Fig. 16, and the results of the loaded swell tests are reported on Fig. 18. A slow direct shear test on a recompacted sample of claystone is c.urrently under-' way at this time. T'he ,resu1 tsof this test will be forwarded in an addendum ass,o.on as possible .• SITE, SOIL .• AND ,GEOLOGI'C CONDITIONS' . . i("he '$'ub,ject lpr,operty is located south and west of El Camino Real approxtmate1y 2000 ft $'.outh ,of th.e Chestnut Avenue intersec·ti'on. The northern ipa·rt of the ,western ib.o~uflda.ry is adjacent to a residential . ' . , .' ~rea ,a1ong$kyl1ine Ii)i·rve ,and the south :end of the ,property i-s immediately. . . .. ~ " 1"..' J l ~ i t 'f 1 \4 l ' l 'to J t f f t • P,age, 4 ·northof a 'residential development a1 ongKe1ly Drive. The site is of moderate to steep hilly topography (side slopes range in inclination :between 4 and ?O to'1) between the approximate elevations of 50 and 330 ft (plan datum). The site lies on the slopes ,of an old eroded mesa remnant surface. The slopes are eroded into drainage swales and easterly extending ri dges, wi th minor 'badland topography present on , ' some of the upper slopes. The lower' portion of the site is generally covered by a , , sparse growt·h of nativ~ chaparral grasses and gr~und cover. The upper area, above approximate elevation 230 ft, is ,defined by an existing old fence line and is generally covered by moderate to heavy chaparral and a ground cover. In the lower elevations Of the site,on a relatively flat area next to El Camino Real, a small area exists where offsite fill was placed during grad'ing of an adjacent subd'ivisl0n. 'The fill was placed an" compaction was observed by Woodward-Gizienski & Associates , ' a~d a rep.ort is currently being prepared to cover this fill. Also, present on the site are several dirt trails and dozer trails with thei r as soc; ate,d cuts and fill s. Description of Soil and Geologic Units Our investigation indicates that the subsurface materials on the subject site can be divided into four main gr,oups or units. These are in i,ncreasi ng age: overburden soi 1s, Quaternary a 11uvi a 1 deposits, Quaternary terrace deposits, and Tertiar.y marine sediments. The group designated as overburden soils comprise the residual soil man.tle which is generally considered to be nonfonnational in character. .., ... ,.. .... WOODWARD· GIZIENSKI & ASSOCIAlES COHIULTINII lOlL AIID rOUHDATlDfl IHDINIUS AIIO IIEOLOGISTS t l l t f I t f. l l f ~ I' I: I . ! f i f 'Project No. 73-1 • Page 5 Overbu'rden Soils A residual $oi1 mantle covers the mesa surface and,side hill areas and has developed over the Quaternary alluvial desposits in the lower portions of the site. This topsoil cover consists of 1 to 3 ft of loose yellow-brown silty sand, overlying the Quaternary terrace deposi t, and up to 1 ft of dark b,rown 5i 1 ty sand underlain by 4 to 5 ft of gray-brown silty to sandy clay; overlying the Tertiary sediments. A 1 to 2 ft cover of brown to dark brown silty sand overlies the Quaternary alluvial deposi'ts in the upper drainage areas; the lower areas are generally cover- ed by 1 ft o~ very dark gray-brown sandy clay to clayey sand. Quaternary Alluvial Deposits These deposits are found in the wide drainage areas and the lower part of the site and were present to a maximum depth of 42 ft in Boring 1. The deposits consist of interbedded layers and lenses of silty and clayey sands, silty and sandy clays, and gravel. The upper 6 to 10 ft of the sandy materials are con~ -s;-dered lo'os-e-and/or'-'Porot./s ;'n -natu-re. !,he ,amount of clayey material within the deposits was found to be greater in borings made in the lower part of the site (below elevation 150 ft). Quaternary Terrace Depo,sits Below the residual soil mantle on the remnants of the old mes~ surface, formational soils exist consisting of den'se red brown silty sand with occassional layers and lenses of clayey sand an~. gravel. This material is found above an approximate elevation, of 260 ft, but has a somewh'at irregular contact with the underlying Tertiary sediments due to the undulating surface upon which the terrace materials were deposited. The probable age of this unit is late Pleistocene. Tertiary Marine Sediments , Below the Quaternary terrace material, the alluvial deposits described above, and extending to significant depths on the site WOODWARD· GIZIENSKI. & ASSOCIATES COHSUl.nJiIG IOU. AND FOUNoAnoH [NGINUIUI ANO G[OLOGISTS I: . l!o< .... ~:' '"' •• .'~. ... ~ • '" .. ' .' I. :: ::::.. ;">:.J"';", '; >, ,;. 'is fo.un4: ~Jtt~rl)~gded ,l~j.er,s'(a,ri,cflens'es :of'very: dens.e ~ht~h~-~",i'at $flty "$~n4\, 'hlr(f9ray .. g~'~n :$a:ndycl ay, ;hard: 'b.rown stlt,S(, clar, I:; ,.,,' ...... :,,: ,:.~nd :very ~en$e '9r~y 's11t,y ,'to .'.c1~eY,s:and .. '~~i:tish-9;ra~' :sH'ty-. , , . '~ '$~"d~:Q~c;\iI'r$: I,di,rec;tly Jrene~th 'tb4f terr.ace matetiall and, a,t"'d~pth: " , ' .' ,thh ma~e~la 1: ,\gr:ade,$ .. ;Onto ,a-,sfto4y to sniy, ,ela)!stone Hlterbe,d:decj: " I . _, \wlth$rl~y ,and {clay.ey ;$ang,s. Jh~se latters'pUs ,und'erlie tn,e: , ,'fnte:rmetUa"te 'to loW~r ipor.t;pn ,'({IT' the site \and,ar,e generally, fQund: I . '.. . " " . . . ~, .. -' " "', \below; ~~n ielev~tion LQf:22:5 'rt~ , As ind; cated,;fn Tes,t Boring,S 4' " , 11n4 10, 'the ,e,~ste.rll' \e~ten(lln9. "ridges found w:lthin\' th~, centra:J' I Ipa·rt 'of \the §'1te ',I're (und~rl~1~ lpreCi,om1.ncrtely :~y the. ·~laye¥'~nd;', : :$·andymat~rjti'l.", '1Ttl~ 1yp,per ',sandy ;portfon :Qf ,this' :u,nlt; n,' d'esC'tr1b'e4( ' I,' ", . 'fYrtti~'r ~no.rtb iA:$' lhe Torr:E!Y' i,Fpnnatlon 'of :Eopene; 'Age,,: whf ch: ~tOu,1:d[" ' \.ro~k, 'th~ 1p,t\Qb:~ble i~9~ ,of ,thtJ .uMtt (as &ocene • J I~ I; " I', ~ , I', I: t~ I; . II ci • , .' Ji ,-. ~ ,~. " :: I; I: . " " .' "~ . '(G~Cl~~i~.{Str,uctuy.:e . , " I _ T _" _ • ..,4J4.» '.... __ • " ' ~. ~ .' . ,~. -' : " ~ . . "rh~ ter~~r~t>', {geologk ~lil:n;t:, ,as obser,ve-d"fn the' 'bucf(e:t. hQiles an-d; , " , , ~~j~cent :r,Q~d iCI.J;tS., \ex"hlbit l' :h:omoc'H:J'ia'l ,di-p to the west Cih'dl have em '. iQur 1nves;tig.ation i~:di-ca:tes that therea~e no landsHdes, .. , -, , ,or :guring:t:he !re·cQnnais $ Jtlce, \pf ,the 'Site. Fau,lt1.ng:was Cilbs.e.rvedi in' " :rQ~,d ~C!.!t 'sQuth ,of :the.si tel ~b,ut :th~ faul ts were conf1·ned"to: the 'Str~i'n ian4F~'ult iM~lye~.nt 'In'ilest~:ga'tton." 'i,ndicates" that: tOe.-'clQs,e,s-t ,iteii~~ ~~~y'lt (a'H>n:9 \wht~h (e.P1c.erit.r.$ ;01 ,Kag-ni,tude' 4 ar. grea~~er haVe: '" .. " ~ . ( , .... , " .... :WQODW.ARD; ·GIZiEKSUI, ASS'Q'CIA.'i'£S;· ,~~,. AIIC!"OU"'~TlO!'! I~~~' ~D;,~qiIIl"'\ < ., I' I: Ii -. I: -' I' I~ ~, • Pwge 7 been recorded is the Elsinore fault zone located approxi,mate1y 19 miles northeast of the subject site. Our earthquake (active fault) evaluation of the s1t~ revealed that, as indicated by C. F. Richter's regiona1ization map. the Carlsbad area has been historically an area 'of relatively low activity. Maps, on which earthquakes Magnitude 5 and over between 1934 and the present, ,and Magnitude 4 and over from 1934-1961 period (Departmen~ of Water Resources Bulletin), revealed that most of the earthquakes have occured some distance from the property and appear to be associated with known active fault 'zones. As previously indi cated, th,e closest acti ve fau1 t on whi ch repeated epicenters have occured is along the Elsinore fault zone situated some 19 miles from the subject site. In thi.s reg~rd, the paper prepared by McEuen and Pinckney. concludes that based on current . available data, "A Richter Magnitude 7.3 earthquake on the Elsi!,1ore' fault havi:ng a statist;,ca1 repeat intetva1 of 60 years' appears to be the 'max1mym probable' ,earthquake for San Diego.'11 For most construc- tign the 'm~ximYm .prob~b~~e' :e.arthquake ;s recomnende,d for design. ~M1:neralResources. /A ;~v1.ew ,Of A',Mines land i,Mi.neral Resources ·of San, 'Otego: County-.:. " C.~HfQrn1a!·" '.Cil1i'forn1.a If,)iYi$i,pn :01 ;tUnes and, Geology' 'county' Report :NQ.3, 19§3., in,d1~ate.$th:at tb~e 'mi,neral ·resources :present on the pro: .. , ;pe.r~y {~r.e n 1mi 'ted. t~" ;the :u:ppe·r !po.t:ti,Qns of. the tert;at'yag~'se.(Iiment$ . ... .' ,whlch ~CQn$a1n .~ I~Yartz" ,rich 'felds,pathic s.andstone. Ttti!s: $and's:tOn~l ;'$, • • "," • _ ...... l ...•. :.p't~nt1~11.Y'. iA ;~q_r.c;ial "Qraqe :$pecial:ty .sand.,·· :Q:ut fie,l:dl 1nves.tigati'Qn , , , , " rtte~h~.a Ith,'t (~n· lth1.$ ls1te·'i.t· t$ IOf ,a· ltmi,ted'quan'l.tl an~! g,enera,H~ " 1 .. " ,. ..",. '-..... ...," 'WOOD.WARD·· ·GIZi.ENSKI; I ASSOCIATES: . coiliu':r_~iOit AND,;ou'Ii\ATlOI'Ir _t.: ~~: ... ~~; I! f l ' f I; " I' I: ,~ '": .. I: I' I> I I: I: Ii I: Project No. 73-130 • P,age 8 • is overlain by a thick overburden of terrace materials and soil mantle. Ground Water No ground water was encountered in any of the test borings at the time of excavating. In addition, no springs, water seeps, swampy or marshy a'reas, or water loving plants were noted 'during our .... reconnaissance of th.e site. Due to the general abs'ence of these features and the elevation of the site above the adjacent valleys, it is un 1 i ke 1y that ground water wi 11 be encountered at s ; gn i fi cant depth on the site. RECOMMENDATIONS AND CONCLUSIONS Among the items which should be considered in the development of a subdivision are the stability of cut a~d fil1.s10pes, the volume change characteristics of the soils, the rippability of materials, in cut areas, the fill suitability c~aracteristi'cs of the anticipated fill material, and the presence, if any, of potential slide areas. ·These factors have been evaluated and our conclusions are the following: (1) The results of our soil and geologic investigation have not revealed any major adverse soil or geologic conditions which would preclude further development of the site. However, potentially highly expansive soils exist at depths in the Formational soils and selective grading may have to be employed in order to arrive at satisfactory finish grade soil condition. (2) Our investigation did not reveal the presence o'f land- slides in areas that were previously suspect as reported in our pre- liminary eng'ineering geology stUdy. , (3) The ground which will receive fill and/or residential ... .... -'. WOODWARD· GIZ·IENSKI & ASSOCIATES CONSUl.TlNG lOll. AHD fOUNDATION INGINEIM AHD QlOI.OGISTI J, I' . J I' J ' I I' I J- I" J: 4:~ I f l· I' I Ji f, I • '$tructure$ ,will. in our opinion, have an adequate bearing value t.o :safelY support-the,pr.o.posed lo~,ds .. when treated as des.cribed ·in the following paragraphs and in the attached IISpecifications for Controlled fil1.11 Footings for structures placed ori prop~rly compacted nonexpan- sive fill or undis'turbednonexpans;v,e firm nath~e 'materials maybe desi gned for a :soi 1 be'arin"g pressureo! .'25'0.0 'lb/ft.2 'at a' depth of 12 in. below rough lot grade., All footings should have a minimum width of 12 i'n. It should be noted that San Diego County Building Ins'Pection~ Departmentcurrerit1y r~quires a minimum depth of 18 in. 'and a wi dth of l5 in. for footings supporting two-story residential structure,s unless the footings are structurally designed and special inspection is .provided durJng concrete pouring. (4) The soils on the site range from 'es's:entially 'nonexpan- sive to highly expansive in nature. The formational whitish gray sandstone and the red brown terrace sands are nonexpansive to low in potenti.a1 expansion •. the topsoilS and the clayey soils witMn the alluvium appe.ar to be low to moderate in potential expansio~. The claystone portion of the Tertiary sediments are potentially highly expansive in nature. (5) It is recorrmended that the following table be used as a preliminary guide in designing cut and fill slopes at the subject site. , .. WOODWARD· GIZIENSKI & ASSOCIA'TES COHSUI.TlIMI lOll.. AHD FOUNDATION INCIINIEIIS AHD G£DLDGlITS I· I " I I' I, I I I' I, I I J ~ . i I ~ I J I ;). • P,age 10 '-. Allowable Height of Slope , Slope In.cl1natlon -Slope Incl1natl0n .' Material 1-1/2, : 1 ' . , .. ,2. : 1 . til Predominate 60 Q) .35 c.. Sandstone 0 ..... .. . . , , . ".- til ..., Pre-dominate 35 ::J 55 u Cl aystone , . ,- Fill Slopes 30 50 .-' .. ... , ... The above table is based on a mi ni~um= factor of safety Of. 1. 8 under stati c cond; ti ons as determi ned by the Janbu method of analysis (Attachment 1). Soil parameters used in our analysis are based on the results of direct shear tests performed for this i'lwes- -tigation, on similar samples in adjacent areas, and our eXperi-enCf,:! with the formations in the subject area. Higher cut of fill slopes may be allol~able~ but. will require more detailed analysis and possibly additional laboratory tests. In this regClrd, it is recommended that grading plans be reviewed by our' office prior to fin'alizing. Very often thestabi 1i ty of cut slopes depends on 9eo109; c factors. It is further recommended that all cut slopes be eXClmined during and at the completiGn of grading to verify 'geo1ogic conditions. Should. adverse cond'itioMS such as water seepage, fractured claystone - or clay sa,ams become apparent, buttressing may be required. All slopes should be plante,d, drained and, properly maintained to help control erosion. , (6) It 1S our opinion that the soils in the subject area .. . ~.' WOODWARD· GlllENSKI &: ASSOCIATES CONSULTING SOIL -".PlO FllUNOATlON ENI;IN[£ItS,AND a;:OtOGISTS I: I: J: J I I I I J I~ I \, ... I I 1,- I' I: I' I I -,:!., 'Project No. 73-. • P,age' 11 can be excavated with normal heavy grading equipment. Our test bori,n.gs were drilled to approximate, depth~ rang.ing from 15 ft to 80 ft without refusal. This indicates the subsurface conditions at the spe,cific locations of the test borings; however, based upon the test borings and our experience in simil ar soils in adjacent areas, no IIhard rockll is anticipated on this site \'lithin anticipated depth of ~xcavation. (7) It should be anticipated that potent;'ally expansive 'soils will be encountered in the following areas: (a) Where shallow cut or fills are made in the clayey surface soils. ' (b) Where Terti.ary claystone is exposed at,finisbed grade in deep cuts. (e) Where clays within the alluvial deposits are eXPQsed at finished grade in deep cuts. It is recommended that potentially expansive soils be replac- ed within the entire level pad area to a minimum of 3 ft below rough lot grade wi th properly compacted nonexpans i ve soil avai lab 1 e at the site. This will require sel~,ctive grading and possibly stockpiling of select soils for later use. Low to moderately expansive soils, i.e. the clayey sand portion of the .topsoils, alluvial soil and ter- ti-ary sediments, may he ucti li zed at ftnish grade providing footings and sl,a:bs are reinforced. :(:8') 'Duringgradi'ng', it is recommended that looseandjo'Y' porol,Js' surfaces,oils and any :exT-sting uncompaGted fills,. not temoveod. by grad;'ng epe.ratiio'ns ,be excavated, replaced and~ cornpacted;lJE!fOre new fills, fo'otings or slabs are placed. The surface of' l'oose and/or iff ·WOOD,WAR:b .GIIIENSKI & ASS:OCIAfU CONSULl1HQ iOIL AHD'·,c)'UNDATtll'H IHG'!lURS AlII! GEOLOGISTS 1 , t:.:-., Project No. ~3-1~ • P.age 12 porous materials ~as a variable thickness, but appears to r~nge ~rom 1 to 10 ft across the site. Due t~ the anticipated variation~ in depth of the existing loose materials, the depth of excavation and compaction should be controlled in the field by a qualified soil engineer upon visual examination of the exposed materials. (9) A set of nSpe,cif1cations for Controlled Fillll is attached. The recommendations made as a part of this soils repo~t sha 11 become a part of the "Specifi cations for Controlled Fill". LIMITATION.S The conclusions and recommendation·s made' in this report are based on the assumption that the soils conditfons do not dey; ate appreciably from those disclosed Oy the test borings. When grading plans are available~ they should be reviewed by our office so that -add ~.t i ona ~ r.e.commendat.;.ons .may. be ... matte., ,as .requ ir.ed. A 1 so, i f Va ri - ations are encountered during construction, we should be notified so that we may make supplemental recommendations, if this should be requi red. Evaluations and utilizations of soil materials and rock fonnations for support of structures· includes investigation of the subsurface condi ti ons , analysis, fonnul ations of recommendati ons and inspections during grading. The soil investigation is not completed lmtil the soil engi neer has been able to exami ne the soi 1 and rock in excavations or cut slopes so that he can make the necessary modl- fications, tf needed. We emphasize the importance of the.soil engtneer continuing his services thrQugh the inspection of grading, including construction of fills and foundation excavations. WOQDWARD • GIZIENSKI & ASSOCIA·TES CONSULTINCI SOIL AHD FOUNDATION --[NCINE£IUI AND GEOLOGISTS II .0 5 10 ~ 15 j! I 20 ~ ..,.. I.-~ "ti c :::J e (!) ~ .25 i :5 35 a.. ~ 1. , .... ,,-~~4---: ...... ___ '-~'--..... ..,.""'"'!""-~<4-r £bring I st i ff, roo i st, dark broW'} sandy clay (a..) Dense, rroist1 yellow-broW'} clayey fine sand (SC) 'Medium dense, moi st, yello.w w :gray 'P.arcus to 7' .depth Fran 7ft. to ·alft. -interbedded with silty fine sand (S+-S» and silty to sandy cl ay (o..-a-I) . 'Medium dense, darrp, gray fine to t»a,rse sand (SP) with chunks of c'layey sand Parti ally porous ~e layers of clean coarse sand with peQbles and gravel Hard, roo i st, b1 ack sandy c1 ay (crt) Interbedded w rth med i I.fIl dense 1i ght gray brQW1 5 i lty sand (s.+-SP) , " 1 aye), §U i (t.t1.)" .' , ~ns~, moist, black clayey silt (t.fi ) Hard, !foist, gray sandy to silty Gl ay (Oi) For Legend, see Figure ij.. Topsoi I Ouaternary Alluvium . Older Redidu~tTopsoil Terti ary Sedimell.ts 1 L;OG OF TEST BORI'NG I 63 ACRE $1 TE -RA:NCHO AGUA HEDIONDA l,..OOlNJARD -GI ZI ENSKI & ASSOCI ATES' .. ; I . , . ! t CONSULTING SOIL AKD, FOUHDATIO" ENGINEERS AND GEOLOGISTS 'J . CAL I A o 5 ,," ';. +' 10 CI) & CD ~ '+-L. ::J <;I) -0 15 c ::J 0 ~ ~ --dl3 :S a> 0.. ~ '. 25 30 10 .. ' 35 .:.~ For ~end, see Fi gure lJ.. (bring 2 Med'il.JTl dense, mist, black clayey fine sand (SC Hard, mist, light red-brown sandy clay (CL) wi th gravel Porous Med i urn dense, moist., ~ i ght brown to 1 i ght ye 11 ow-:broW'l s i 1 ty fi'ne sand' (~) wi th layers of sandy c1 ay (CL) and some C1 ean sand Porous scattered pebbles and gravel Dense, moist, dark gray clay~y sand (SC) Hard, mist, gray-green sandy to silty clay (0'1) , Dense, moist, light gray-brown clayey sand (SC some silty clay (eL) Interbedded dense, mist, gray clayey fine sand (SC) and hard, moist, brown ,silty clay (CH) Topsoi 1 Quaternary Alluvium Older ' Residual Topsoil TerHary Sed im~nts ----' --------,'-- continued on next page LOG OF TEST OOR.I NG 2 63 ACRE S'ITE -RANCHO AGUA' HEOIONDA WX)cWARD' -GI ZIENSKI & ASSOCI ATtS CONSULTING SOIL AND FOUNDATION ENGINEERS AND GEOLOGISTS , ~'''')i> l\~ Ji . l 1 35 +' ! (l) i 40 ::J CI) "C t-c::: ij9 _J ::J g ~ ..-~ ..c +' Cl.. ~ .Boring2 continued -_. ----_. ~-------.. -.~---sane as before II Hard, moist, bro~m silty to~ sandy clay (Cl) blocky fracturing LEGEND DATD ,= Dry at time of drilling. WC = 'Water Content in percent of dry weight. DO = Dry Density in pef. Be = Hu·mber. of bJows by 14-0 pound hammer fal i ing 30 inches to drive sampler 12 inches. Sampler Data: ID = 2.0", 00 = 2.5". UCS = Unconfined Compressive Strength· irt ~$f. OS = Direct Shear Test Data: ~ = Angle of Apparent Frlct~on in degrees. e = Apparent Cohesion in psf. LL = Liquid Limit in percent. PI = Plasticity Index. (SM) = Group classification symbol in accordance with the Unified Soil Classification System. ~ = Sample Number. lOG OF TESTBO.R I NG 2 Tertiary ~Sediments . 63 ACRE SI TE -RANCHO AGUA RED I OND.A WX)I).JARD - G I ZI ENSK I & ASSOCI ATES CONSULTING SOIL AHD FOUNDATION EHGIHEERS AHD GfOIJlGI-STS SAN 0 I, I . ' 0, R o ~ we = 10 I' I: 5 I' I I +' f() J! .-15 ~ ::J en '"g ::J I 0 d5 ~ aJ .... I '" '> ~ ~ a. ~ 1/ N • ... 2,5 r' \"(,J I qs I: I.- I' 55 I I ~! For~ Legend, see Fi gure 11-. I I ,.': .:; ~ ;, '.~' ~ <> '~ ':.'" ~ 'Boring 3 Dense, damp,' red,.,brOnTl silty medil,lm to f,ine sand (SM) wi th scattered pebbles WIt/1 gravel -Har:d, damp, .~ray ''Sandy clay (-CH) Very dense, damp, whitish gray silty me,dium to fine sand (s-i) trace day clayey sand (sel 'Cl ay' 'bed tCl-) Hard, moist, gray-green sandy clay (CH) . Very dense, damp, light gray silty fine sand (~) trace clay . , Dense, c1 ayey wi th depth --- - ---- ---continued on next page Pleistocene Terrace material Tertiary Sed iments sandstone wi th sane 01 aystone --------- LOG OF TEST BORING 3 63 ACRE SITE -' RANCHO AGUA' HEDIONDA " , WJOa..JARO - G I Z I ENSK I & ASsOC I ATES CONSULTING SOIL AltO FOUNDATION ENGINEERS AND GEOLOGISTS SAH 01 £00, I FO.RH IA I I; I: , ! o+J & J 0> ~ '+-~ .~ 1 "t::I c: e CJ I ~ ..... cii :P 0.. J c8 J I ',-~ I i I- I I I I I 55 60 65 70 75 80 DATD ". , Boring 3 mAti-nue<! ----...--:----------. --,_ ....... Very dense, damp, light gray silty fi-ne sand (9-t) Hard, moist, gray-green silty clay (CH) Very dense, moist, light gray ·clayey silt Mi . Very dense, damp, 1 ight gray silty . sand (9-1) . For Legend, see Fi gure lJ.. LQG OF TEST BORI NG 3 Tertiary Sediments Sandstone wi:th some claystone and sandstone -63 ACRE SI TE -RANCHO AGUA HEDlONDA WJQlNJARD -GI ZIENSKI & ASSOCIATES COMSULTING SOIL AND FOUNDATION EMGIHEERS AltO GEOLOG.1STS SAM CALI FORN I A I I I': I: I . I I, I I I I ,--.: I I I- I I . I" I J o 5 .... ~ /0 /5 25 30 35 , Boring ij Graded Cut Pad Hard, danp, 1 i gh t gray,,:, broW"! sit ty clay (Oi) Hard, damp, gray-brown sandy to silty c1 ay (Oi) Hard, moist, brownsi lty clay (01) Hard, moist, gray fine sandy clay (CH) Very dense, moist, light gray silty fine sand (SM) Trace clay Hard, moist, gray-green silty clay (CH) Very dense, danp, 1 j,ght gray c1 ayey si 1 t (MH) ~-----' -----continued Q'l next. page For Legend, seeFi gu reiji LOG OF TESTBOR I NG ij Ter:tiary Sed'iments Claystone w,j th some sandstone 63 ACRE 81 TE -RANCHO "GUA" HEDtON'DA , WJO(l.JARD --'G I Z I tNSK I '& ASSOC I CONSULTING SOILAMO FOUHOATIOH EHGIHEt~S AND ~LOGISrs IEOO ,-J f~"" , < I I' I' I: I I I I I I, I ,t, .~ I I' I· ,', , :~~.~. ,". ~ . I J , I 1J5 .r::. ~ ~ 55 60 65 70 , _______ Ibrin~ ~nti~ued _' __ _ ,Very den.se, damp, 1 i'ght gray clayey silt '(MH) Very dense, rroi st, gray si·1ty medium to fine sand ($1) . . .. ~.~ .. , . 1:1 :;:::'GS~ TSilty fine sand (~l : :;'~;i~. chunks of hard clay . til. hard c10y bed DATO For Legend, ~ Fi gure IJ. / LOG OF TEST OOR I H'G q Terti,ary Sed i'ments Sandstone with some mudstone 63 ACRE SITE -RANCHO AGUA~'HEDIONDA ~[)..JARD - G I Z I ENSK I & ASSOC I ATES COMSULTlIfG SOIL AIID FOUHDATIOM EHGIHEERS AND GEOLOGISTS SAN IEOO. IFO .:.' -~,' " •• • tJ·,· \ ' ~ l.a. ~I ---.. ,;~ ~ I: I· f ~. I It I· I I , 0 5 10 15 20 25 ac = 5 Be = 26 Bt-; 60 Be = 23 . os: ~ = 22 C = .SSO Be = 36 Be = " 2 Boring 5 ., .. : ..... .; (Loose,) roi st, brown silt.y sand' '.. +" _.:..:$...,..f-_S..;..C.!..-,T_ra_c_e _c_l a..::.,y'---_Po....,ro_u._s __ '::,'::'.".:' t-bd i urn dense, 100 i st, . yell ~brown :3:":.;'~:.:: si lty sand ($f) (Porous) ," ,( &J:;';~~ ! .~~~::::' .. \ '.; .... , .. 'Very 'dense, danp, yell ow-broW'! silty fine sand .(~) with trace of clay SI i~htly Porous TQP!$oi 1 . Qua,ternary . Alluvium ij :; .;'~lf ~ ;~i.:j~' Medium dense, moist yel10t0i-bro\"ll silty m~ium to fine sand (~) Sli gh Hy Pbrrus . Scme layers of c1 ayey sand (g.» :,}.:.~-Y :} ~(~@1 .. ,.:,~.::: !l Clean sand (sp) with gravel . Dense, moi st, brovm .si 1 ty fi ne sans (g.,t) wi th chunks of t 1 ay (CL) Hard, moist, gray sandy' clay (el) Te,rtj·ary Sed imen.is. ~ For legend, see Fi gure q. LOG OF TEST BORING 5 63 AC.RE 51 TE. "'RAnCHO AGUA H,EDlONQA WJODtJARD -G 1 ZI ENSKI & ASSOC I ArtS CONSULTING SOIL AHO FOUHOATIOK ENGINEERS ,AKD GEOLOGISTS 01 CAUFO 0 5 +' cu i2. I ~ 't ~. 10 '"0 c ::I ~ ~ .- a3 15 ..r::. +' ~ 20 25 , Be = 3 LL = 28 PI = 13 Be = 16 Be = 30 Be = 28 we = 10 DO = 108 B~ = 33 os: ':::; 29 = 320 ~ ,~, '; .. "~:: ~ .: .~/:~'.~ ~::; :~:~t::~!.: ... :: .... .... ' DAlO Ebri 119' 6 Very loose, moist, black clayey sand . Topsoi J (Se) Porous Loose to rnedill'll dense, lOOist, yellow Quaternary brO'll'l sil.ty medi urn to fine sand (9.1) Alluvium some layers of clay (ell Porous Very stiff, moist, dark broW) sandy cl ay (eL) Slightly porous M3d i urn dense, bro,.m clayey damp, sand (SC.l -51 ightly porous wi th gravel Hard, moi st, gray sandy clay ( eL) Terti art' Sedimen s Dense, moist, light gray clayey sand (SC) &coning sandier with depth with gravel 'to'.. : ~\.' 4 .... " For Legend, see Figure ~. LOG OF TEST BORING 6 63 ACRE SITE -RANCHO AGUA· HEDIONDA WXlOWARD - G I ZI ENSK I & ASSOC I ATES COHSULTIHG 'SOIL AND FOUNDATION ENGINEERS AND GEOLOGISTS SAN 01 I FORNIA ~ I .. Jl ~ ~. P " <iH ! I '4), ~ i~ 't!! .... ; -0 I "0 ,~ I ! --·83 I £i ·,:N I ~:, ;<' I I I- I I I ':1' ","" t I " " , . 15 '0 ---: : ~ : , I '11\' i ;y. " .' fine ~Md: (Hard, !Ilbtst, :black :sandy ,clay (tt)\ ;$Hgntl yporous :~hlil :dense,JTX:'iist, igray-br:owh c1sand (SC) some,-clay!chunks s , --. :~n~~f '/i'Pi $'t" Hght9ta1-,br.t'W.O (~l~yey, :f'loe ~d fSC): _ ~slI9h'tJy !PQt'Ous ' ,> ,t: I' , 'Quater-nary '" ,Al:t,Vi om , LOGS OF tESt 'aJRlNG,S7 AND 8 , !o3A'CRESI TE oil RAftCHO AGUA 'H'EOrONT}A .... ,6 IENSKl & AS' :SbiL NCO', rOHlEHGIHEERS _",,". : ( ,,\'. " ,l'",' , , 1 .. ' ~ ,',,' I ~ l ;:,'0':: t, , '. -, ' , .,' ~ '" ... ' " . ~. " . . " .-~ , ' '. ','., " . ".: '. ':, .. ', • > ". ~ • :'1""., ... ~, " ~ . -,~ ~ " t " , "t,' . '. ~ " ',' <. . "-, : ... "'<, '. , .', ' .-'. '-.' " (,,'" '. " ~ .' " :t .:. ,'J-,-' " .. ' " .' to.O',·~i£$t', s)t1tN.G g,,~ ~:. ,-: -, .... , -~ -'- ;..:-~ " :.~~ ... :'t"::,,~'.~ ~~. ; .-~ ;. , ~.' '.", •• ACt,! 8f1£'".. 'RANCHO AGlJA.JtEt;l' <tfDA .. :·,>:, --, .' ~ .' I,',' 1 ' , J' I I I I':~ I I ,. ;; I . :' 15" , 19 ' :I't = , ," ,-, '. , . ~', .' : " . ,'" . , " " ',' '-' '. ; , !to,r !l:;egend" S~ 'Fi gu te q:. ,lOG' OF rEST BORIt~G, 10 ... , .-G,rZI'ENSKI&ASSOCI ArES 'CQHSO,LTHIG 'SOH, ,AND FOUHDuroH ElCGIIt'EERS' AMQ GEOl~~I$1S: I: I 0 .' , , i 5 I ," ..... ~ J 8 ~ . 't 10 ~ ~ "0 c: :J e (!) J' ~ ~ IS' :P I ! i 20 I L J '" j 25 1 t· 8e =, 3 we = 6 DO = 112 Bj -38 os: = 33 ' c = 0 Be = 3~ Be = 5~ , , I, " '£bring II , , Very loose, rroi st, dark broW'! si lty , fi ne sand ($1) Porous Dense, danp, brOW"l to yel1o~bro,.,n silty fine sand (SM-SP) sl ightly Topsoil Quaternary Alluvium ~ , porous , '~~,::!:;'" ':Part i ally canmted '~"'~~.: .. j~.'~.'::~ ~l = ::: :~::: I~ . ~~~ a.y interbeds Hard, moist, gray-brown clay (CH) For Legend, s~ Fi gure It Terti ary Sed iments • Cl aystone' LOG OF TEST BORLHG II 63 ACRE ,~ITE -RANCHO AGU~ HEDIONDA ' , WX)[)..JARO - G I Z I ENSK I & ASSOC I ATES COHSU!.JING SOIL AHO FOUNDATION ENGINEERS AND GEOLOGISTS SAM 0 I Eoo CALI FORH I A " r-· f I':nlllll .... SILT andiCbA'f f I I J I I ¥ I f, ~, ,I ~, t I 'tV!, .,. ~ I ;:; , , .-- , " ,FJne 'Sieve Sit'!s ,j , 10-1'6 20 '30 140 60 80 J ~O !200" 1 "'I ,",' 0, _ -, i ~~tlj::.:t"t,~,~~:tj:~~::t:~j,,:,~t=~~t:t=t:======t:~~=====4' "';1' '-', ," ',' '" , : 30 It -,--' -, , J " t 1 ' It (I"LI .;.J.,.,,~'I-:.Lo' :',&.",' :~.....,.t-J..."""",J"., ,,;1,1; .. ,..,., ,~"""",, ",,", _.,..',;I;.':.-J"-L.L"""""'"u......-L-J,o.--U;..;.;k,,~ ___ -'-_ ....... _____ ....-....I'IOO 100 '50 ' 1.0 0.1 0.05 0.01 0.'0050.00:1 (G,8'4JN SUE 'Iff ,MILLIMETERS *l:L *pr -.. ----. --- 3 .. ':1 ~ Srlly med1um ,'to 'fitre sand (SM) ..,. '*u, = 'Lj,ql)id i~,imit *p I ::; Plastfcity.h'ldex GRA fN S I tED I S TR I BU'nOH CURVES 63 ACRE SI IE -RAN,CHO AGUA. HED H)N'OA , ' , :PR~ ~BY,:G~ itAr.rRQ.!'~l.'~ : i PROJ;. JtO: 73,..',,~ I :<iX:'j') BY.. :DATE;,3)/?/7.3 ':FJGUREHO,:' , J5 I ' " ," ."',,". J .... I .,.: 'f . _, 1-·' ~j",>. -1 ~. • , , ~ ... .J R I I I -I l I f I': i -- oJ< _ , ........ r-. I,' _. "'''' ' ..... "'-"""'" r ,. " --' -. ".~ -.~. --.. -'---"'J. :olRECT SH,~TEST D~JA \ '-'-- !D"';-O~n,i't;y, :fI,cf . , :nO :lnrt"l.l iW.t~r 'C9ntent. % " '17 , -. -------. -~ -; iFina,l ;W~ter :(!911tent. %, 1:1 : ~p'anmt Cobe~ion. ,psf 380, :Appare~t friet·ion Angle. 0 .27 130 120 i 1; I a. - '90 MAX I MUIo40RY DEHSITY.pcf OPTl~H 'MQISTURE CO!HEn, ~ 10 20 , , " ; , LAEeRArORY'~'ACnOM LABORATORY COMP~CTlO'" TESTMETHOO: ASlM-O 1557-79. 2 "~IS '15 7 380 22 , lotECHNHCAL AHALYS/:S 3: t, II:,IO.IW 200" 100 3 , ~ ""\"~ -,-,,' -:; , \\..' .. ' , ·80 " .C!) 'z: ;; 60 " Ct) -c Q.. J\~, I-z: 110' w -Q .cz: ·w ';' \\ ,a.. :' -20 . ,-=' o .. 1.1 I .I J', .I .I" . , . 10C'i0 100,10 1.0 0.1 0.0.1 0.001 'GRAINSI'ZE I.H MI LtIMET£RS i, 1: rLASTI CliY CHARACTERI'STICS' ,L.iq\lid Limit, 'f. "Plasticity Index. r. . ~--~--~~----~--~~~ Clas'si fication by Uni fied SoH J Cl'ass;-ficatLon System ,S;iELL '[EST" DATA 2 , Initial Dry Density. pcf ~~~--~~~--~~~--~ i, Initial Water Content. % ~--~----~--~~--4---~ Load. psf !: 'Percent Swell 30 . ' HOTE: ~'; Spec;Jme.n I = Sample 1joo.9 Spc'cimen 2 = ' ' Samp Ie 5-5 Specimen 3 = Sample 6-2 FilL SUITABt.LllY TESTS 63 ACRE 51 TE -"RAN CHO AGUAH ED ION,DA ... GIZtENSKI & ASSOCFA CONSULTING SOIL·' -.-' " , ' 'RESUt TS OF LOADED SViELL TESTS ----Initial Final Vol ume Change Sample Dry Water Dry Water Pressure Air Saturate Number Density Content Saturation Densi ty Content Saturation Dry pef :. % % pef '. : ' " S-t 1Ia-r6 '8'5 , 112 10-2 93 28· 95 '88 : . OJ arreter of Samp 1 es: 1.94-inches Height of Samples: -0.628 inches % % psf % of InHial Heigh,t 15 ' 85 ·160 -1.6 -, 1'.-0' 33 100 160 -0.1 I 5.1 " . , -. RESULTS OF LOADED SWELL TESTS ':63 ACRE SITE ... RANCHO AGUA HEDfONDA wx)DWARD - G I ZI ENSKI .& ... dJ\..IL. -- " CONSULTING SOl L ANt) TlON ENGINEERS AND GEOLOGISTS .' , I· I, ~ I· I J I I I .. • STABILITY ANALYSIS CUT SLOPE IN PREDOMINANTLY SANDSTONE Assumptions: (l) ?) (~~ (5) ('6) Haximum height of slopes, Maximum slope inclination, Unit weight of soil, Apparent angle of internal friction, Apparent cohesion, No seepage forces. References: H y + c = = = = A ttachment I P,age 1 of 3 Case a 35 -l-l/~:l 120pcf 35° , 300psf (1) Janbu, 'N., ''''Stabflity Analysis of S'lopes \-lith Dimensionless P'arameters", Harvard Soil Mechanics S~ries No. 46, 1954. (2) J'anbu, N., "Dimensi onl ess Parameters for Homogeneous Earth Slopes ", JSMFD, No. sr46 , November, 1967. Analysis: • Case b 60 2: 1 120pcf 35° 300psf Safety Factor, F.S. Case a ~here Ncf is the stapi 1 i ty No. for slopes with both c and ~." -. y H tan ~ c = 120 x 35 x tan 35 300 From Fi gure 10 of Reference 2 F S -25 x 300 • • -120 x 35, 1 .78 ' , Caseb = 9.8 25 A H tan $ , Acf = c = , l20 x 60 x tan 35 300 = .16.8 Ncf = 46 F S -46 x 300 -_' '1,.91 • • -120x 60 " WOODWARD· GIZIENSKI & ASSOCIATES CONSUlTING SOIL 'AND rOUNOATIOH (NQINELIIS AHO GEOLOGISTS J~J:, iU~:" ... ~,<c",<,v> .. -, -'" ,. . \ .... ' ", . 't I·' -" • I .. I· I , I''': I , I ~ . P;roject'N~.. 73.0 Assumptfons: • STABILITY ANALYSIS CUT SLOPES IN PREDOMINANTLY CLAYSTONE H = , Attachment I P,age 2 of 3 Case . 35 q 'Maximum. height of s,lop"es, lMaximum slope inclination, Unit weight of soil,' -:. l ... ·1/2 .... l Apparent angle of internal friction, Appanmt co'hes; on , No seepage forces. y 'f -C = 120pcf' = 25° = 600 ps'f References: (1) (2) Analysis: Case a Janbu, Nq "Stability Analysis of Slopes \'1ith Dimens;'onless Parameter-s", Harvard Soil Mechanics Series No. 4:6, H}54. , . J'anbu, N .. ,· "Dimensionless Parameters for Homogeneous Earth ~ Slopes", JSMFD, No; SM6, November, 1967. Where Nef is the stability No. for s 1 op~s wi th both c and ~." . ). . _ .. ::yH tan L = . 'cf - c 12Gx 35 x tan 25 600 :; 3.29 10 13 From Figure. of Reference 2 Nef = F 5 13 x 600 1'. '86 ' •• = 12:0 x 3S"" = Case b ~ 1\ -·"cf - r.S. AH tan!" ' c . 20 x '600 = 12Q x55 ,.. = 120 x 55 x tan 25 . , 600 -. .... 5 .. 13 ... 1.85 " -"-.. i Cas.e' 0 " .. 55, 2: 1 120pcf 25° , 600 psf -- WOODWARD· GIZIENSKI & ASSOCIATES ~OIolSULTlHQ 101i. ANO fOUNOATION ENQINEllIS AND (ltoL~I.sn I:' I I, i I I, {o. I' I I: I· I I I·· I I· I I I I I -. ProjectNQ. 73"lii ., Assumptions: STABILITY ANALYSIS FILL SLOPES (1) Maximumhei ght of sl op'es, (2) Maximum slope inclinati.on, (3) Unit weight of soil, . (4) Apparent angle of internal friction, (5) Apparent cohesio.n, (6) No seep'age forces. References: H y .~ C = :;: = :;: Attachment l' P.age' 3 of 3· f '; Ca·se a ~O .' 1-1/2: 1 120pcf 27° 4S(}'psf (l) Janbu, N.!t ·ItStaMlity Analysis of Slopes with Dimensionless Parameters". Harvard Soil Mechanics Series No. 46;.1954 .. . (2) J'anbu, N." "Dimension1ess Parameters for Homogeneous Earth Slopes II, JSt1FD., ·No. SM6, November, 1967. Analysis: Ca,se .b SO 2: 1; 120pcf 2.7° 45@psf Safety Factor ,f ~S·. Case a Where Ncf is the stabil i ty No. for sjopes with both cand 41'.· A :;: -X H tan 'w cf' . c 120 x 30 x tan 27 -:;: 450 4.08 'From Fig.ure 10 '·of Reference 2 15 x 450 F.S. :;: 120 x 30 • 1 .. 88'· Case .r;, N = 15 cf 'J. H tant . 120 x 50 x tan 27 }.cf = c .. 450 Nef = 25· 25 x 45"0 F.S. ::: 120 x 50 :: Laa .= 6.8 .. ' WOODWARD" GIZIENSKI & A.SSOCIATES CONSULTING lOlL AND 'OUNDATION £NQIN£lIl$' AND Gro~O<.'$1S J' i , J i I I i J " I' Project No. 73~130 • ., SPEC IFICATIONS FOR CONTROLLED, FILL I, 0 GENERAL Attachment II P'age l' of 4 These specifications cover preparation ,of existing surfaces to receive fills; t,he type of soil suitable fpr use in fills; the control of com- paction ~nd the methods of testing com~acted fills. It shall be the Contractor's responsibility to place, spread, \'Jater and compact the fill in strict accordance with these specifications. A Soil Engojneer shall be the O\'mer's representative to inspect the construction of fills. Exca..,. v,ation and the placing ,of fill shall -be ,under the direct ;·nspection Of the Soil [n9i neer and he s'ba'll "give 'wr'itten noti ce of conforma:nce Vii th the specifications upon completion ~f grading. Deviations frOm these specifications w111 be permitted only upon written authorization from the Soil Engineer. A soi1 investigation ,has been made for this project; any recommendati ons made i·n the report of the soi 1 i nvestigati on or subsequent reports shall become an apdendum to thes'e specifications. 'Il. 'SCOPE The placement of control1ed fi.11 :by t~eCon.tractor shall i·nc1.udealJ clearing and grubbing, removal 'of 'ex i sti'ng unsatisfactory'material, preparati on of the areas to be 'ffl led, 'sprei3-di ng and compacti on of fill in the areas to be fi 1 led , and a 11 other Vlork necessary to complete the I grad; ng, of the., fi 1.1 ed . areas. ' ; III. MATERIALS , , I 1,0' ft I· I I J I I, 1. Materials for compacted fill shall cons,ist of any material imported or excavated from the cut areas that, in the opinion of the 50;1 ~ngineer, is suitab1e for use in constructing, f;l1s~ The material shall contain no rocks or hard lumps greater than 6 inches in size ~nd shall contain at ' least 40% of material smaller than 1/4 inch in size. Nd materi~l of a perishat;>le, spongy, or othervlise improper-nature shall be used in filling. 2. Material pliced within 24 inches of roug~ lot grade shall be'select materi-al that contains no rocks or hard lumps greater 'than 6 inches in , size and that svIel1s less' than 3% when compacted as hereinafter specified for compacted fi 11 and whens\:(bjected to an axial pressure of 160 :psf. 3. Representative samp1.esof mate~ial to be used for fill shall 'be tested . in the 1aboratory by the Soil Engi,neer in order to determine the maximum density, optimum moisturec,ontent and classificati-on of the 5,oi1., In addi~;on; the Soil Engineer shall determine the approximate bearing value of a reCOnl- pacted, saturated sample by direct shear tests or other' tests applicable to the particular soil. . . ,- 4. During grading operations, soil types other than those analyzed: in the' ,report of the so i 1 i nves ti ga tion may be encountered by the Contractor. The Soil Engineer shall be consulted to determine the suitabil'ity of these soils. WOODWARD· GJZIENSKJ & ,ASSOCIATES COfdULTIHQ IOI~ AI«) 'OUHD4nOH (HQIH(~ AND 18fOLOOIlTS J J I J I I I I I I I I ~. I, I· I I J I , I IV~ P,roject 'No. 73-130 • 'COMPACTEG !FT~LS .1. ,General •• ... ~-- Attachment II 'P'age 2 of 4 (a) 'Unless othe'rwise speCified, fill materiaf shall be compacted by the Contractor whi 1e at a moisture content neat' the optimum moi'sture content and to a density that is not less than: 90% of the -maximum density determined in accordance. with ASTM Test 'No. 'D1557-70T, or other density methods that will obtatn ~quivalent ,resql 1;s. (b) Potentially expansive soils may be, used in fills below a depth of 24 inches and shall be compacted at a moisture content greater than the optimum moisture content for the material. , ' 2. C1e~~ing and Preparing Areas to be Filled (a) All trees, brush, gr~ss and other objectioriable material shall be collected, piled' and burned· or otherwise disposed of by the Con- tractor so as to leave the areas that have been cleared with a neat finis'he:q appeara'nce free from u.nsightly debris. {a} ,All 'Vegetable matter and objectionable mater,ial ,shall be removed, 'by the Contracto,r from the, surface upon which the fill is, to ~e placed and :any loose and porous soils shall be temove,d 'or compacted 'to' the depth shown on the plans. The surface shall then be plowed or scarified to a minim'um' depth of 6 inches until the surface is free from uneven features that would tend to prevent uniform compaction by the equipment ·te~;ae :'l:Is-eO. , . ", ' (C) Where fills are constructed on hillsides or slopes, the slope of· the ·ori 9i na 1 ground on ~'/h i eh the fi 11 is to be placed sh~Jl be stepped 10r ,keyed by the Contractor as sh0wn on the attached figure. The step$ shall extend completely through the soil mantle and into the underlying fOl"mation materials. (d) fAfter the foundation for the fill has been cleared, plowed or sca,rifi~d" i't shall be disced or bladed by the Contractor until it is uni:form and free from clods, brought to' the proper moisture content and 'C()mj)'a:c,te.d as's pec; fi ed for fill. 3. P'-lac~ng, Spreading., and Compaction Fill Material Ca) 'The fHl mate,rial shall be placed by the Contractor in layers that 'when -tomp,acted. shall not exceed 6 i nehes. Each layer shall be spread :~yenly anCfsha 11 :Qe thoroughly mixed during the spread; ng to obtai n :unifQrmity. ofma,terfa~ in e~ch layer. ' (b) 'Wh-en the'moisture content of, the fill material is above that spe,cifi-ed J>y the Soil Engineer, the fill material ~hall be aerated by tJy the 'Contractor 'by blading, mixing or other satisfactory methods until the motsture c00tent is as specified. WOODWARD· GIZlENSKI & A'SSOCIATES C:ONSULTING 40lL ANO FOUNDATION lNGINUIIS iIIiD GtOI:OGlSTS ---;;'l 1 j , I I I ) '1 I I J . I· I I I , V. VI. . Project No. 73-l~ •• Attachment II Page 3 of 4 (c) When the moisture content of the fill material is below that specified by the Soil 'Engineer, water shall be added by the Con-· tractor until the moisture content is 'as specified. (d) After each layer has been placed, mixed and spread evenly, it . sha 11 be thoroughly:' con]pacted by the Contractor to the spec; fi ed density. Compaction shall be accomplished by sheepsfoot rollers, vibratory roller, multiple-wheel pneumatic-tired rollers or other types of acceptable compacting equipment. Equipment shall be of such design that it \·1111 be able to compact -the fill to the specified density. ~ompaction shall be continuous over the ehtire area and the equipment shall make sufficient trips to insure that the desired density has. been obtained throughout the entire fill. (e) Surface of fill slo.pes shall be compacted and there'shall be no loose soil o~ the slopes, INSPECTION 1. Observations and compaction tests shall be made by the Soil Ehgineer during the filling and compaction operations so that he can state his opinion that the fill was constructed in accordance with the specifications. '2. The Soil Engineer shall make field density tests in accordance with ASTt~ . TeSt No. D-1556-64T. Density tests shall b~ made in the compacted materials below the surface where· the surface is diSturbed. When these tests indicate that the density of any 19.yer of fill or portion thereof is below the specified -density, the 'Particula-r layer o'r pO'rtions -shall be revlOrked until the specified density has been obtained. PROTECTION OF ~JORK . -1. During construction the contractor. shall properly grade all excavated suffaces to provide positive drainage and prevent ponding of water. He sha 11 control surface water to avoi d damage to adjoi ni n9 properti es. or to finished \'Iork on the site. The Cpntractor shall take remedial measures to prevent erosion of freshly graded areas and until such time as permanent draina,ge and eros~on control meas'ures have been installed. . " 2. After completion of grading and the Soil Engineer has finished his observations of the work, no further excavation or filling shall be done except .under the observation of the Soil Engineer. , , WOODWARD· GIZIENSKI & ASSOCIATES CONSULTING SOIL ANO fOUNOATlON [NGIN([R5 AND GlOlOCI5TS --~ .. . '. ii' , ! : il; ! [ ' .. I ;a\ .. ~ 'I' . , j i 'Ii ---... ~ ~ -~.'IiMIIIIioIIII ...... ~ ~ ~ ~ ----. .~ ~ .~ ;-.- , ). -. , . Strip dS Specified '\ -0 ' ..., ~ Gro'.md o~ C-&. ~ m-oj gem6v~ all Topsoil NOtES, .-....... the ~~ri!!A~\ ",tcl:eb: .~ ... Qf \<ey-sha:l1be 2 feet ~'ider than t;h~ eQ!I1J~~¢ ttQn,' e.<t;.tt~m~nt, ~n4 no t less than 10 fee·t. Th~ 9~t~f(h~' ~d'ge 0'£ bO~~Ofil k~y shall be below ~opsoil QJi lC)o$e G:.~rf~~e ~te~14'1. K.~Y$\ a:J'~ :r~qy,i:r~9: ""here the .natural slope is £ teepet . .... . eh<!tl (, tiortiollt4'l: t;;Q ;1 vet;tJt:al, or wl;tere spec:ified by $o::tl. Engineer~. Slope Ratio.. N M <+r 2' 0' • 1 .....s 1" w~ ,.!.d W,i 0" ;. f, ~I l! ..... ;.; . . See Note r .... ..: ........... /~~,~ i I. ~IJ '." 0' 'f. it. k B. j See Note ~ f l ~ ~ ff • ~. !( t; ~ ~ i ~ ~'~Iil <0 c-t-' roo. (') ~::r 3. : o Cl) .. -t,::S c-t-/'! • ~ ...... .... f. '... . ......... -.. .. ......... "........... .. .. -........... -. J.' -1'" ... '" '1*= .. I ...... 3467 Kurtz Street .• San Qiego, California 92110' 71 -224-2911 x 69Z, 841 Douglas Southwest Corporation Post Office Box 1114 Carlsbad, California 92008 ·Attention: Mr. Mike Roston SHALLOW SLOPE SLOUGH LNG CARLSBAD PALISADES CARLSBAD, CALIFORNIA Aug.ust 30, 1977 Project No. 57372W \! I ' .J ti\lJ:ti . SEPo'21U77 .. Jj!JIj\J'.west Ivn In accordance with your request we have made an tnspection of the exi-sting slopes paranel and facing E1 Cami·no Real and TarnaraGk Street at the eastern boundary of the subject subdivision. The purpose .of our inspection was to document the shallow slope failures wHich have occured an~ to express an opinion relative t~ the ~ause and effects of the failures. Inspections of the subject slopes were made by Mr. James Cavallinand ~1r. Richard P. While, engineers of our firm,on August 19, and 23, 1977. The slopes in question are approximately 45 f.eet high (maximum) and in- clined on 1-1/2 to 1 (horizontal to vertical). These inspections revealed that p~rtions of the slopes have suffered shallow slope sloughing. The areas involved generally ranged from 40 to 100 feet in width and involves .the lower one-half to two-thirds of the slope. An examination of the scarp at the top of the slipouts indicates that the failures involve the Quter approximately 12 to 18 in~hes of the slope. It was 'noted that tne slope covering consists of a long-bladed grass with'a sparse to moderate growth of bushes. It.was also noted that soil appeared to be saturated to the depth of failure and that the soil in the outer zones of the slope appeared to be clayey to s.i1ty sand ranging to lean sandy claY (comp~cted fill). " ' , Based on the resul ts of our i nspecti on and a bri ef rev;,ew of our files, we present the following conclusions and recommendations at this, time. (:1) It is our' opinion that the most recent type of failures suffered by. the slope are simila.r to those which have occured previously in this area and are not deep-seated and should not endanger structures at the top of the slope. Previous failures have be~n investigated at the subject site involving the· same slopes and reports concerning this problem have been issued on May 12, 1976, June 14, 1976, and January 12', 1977 . 80nsulting Engineers, Geologists I3ndEnvironm(!l1t~1 Scientists Offices inOth~r PFincipal.Gitie$ • i Doug.1 as Southweserporation August 30, 1977 Project No. 57372W Page 2 Lward-CIYde Consultants (2) It is our oplnlon that the outer typically loose near sur- face soil and vegetation of the slope became saturated du~ing recent rains and slipped downslope in a sheetflow under its own weight. It appea~s that the relatively wet (saturated) zone and the zone of failure correspond to the depth of roots of the vegetation.' It is recommended that a landscape architect or contractor be employed to study this prob.lem further and to determine if the slo.ughing could be related to the type of slope planting .employed. (3) It is recolTQllended that after the area has dried, the existing sloughed mat.erial be removed and the scarp area be fi·l1ed with granular soil, th~ slope trimmed to the desired slope surface and the area re-pl anted in accordance with a. landscape arch itect I·S recommei1dat;ons. (4) It'is recommended that future irrigation of the slope De carefully controlled such that only enough moisture is iupp1ied to support the selected vegetation .. ' If there are any questions concerning this matter, plea~ecall or write at your convenience. WOODWARD-CLYDE CONSUlTANTS .~ .. (! ~ . : '--/~ .----~ .~ --:r--e--C L.. /7 V' . Louis J. Le(:( . R.E. 14129 LJL/RPWjlkm (4) 3467 Kurtz Street •- San Diego. California 9211 ", . 714-224-2911 - Telex 697-841 Douglas Southwest Corporati6n PosE Office Box lll~ Carlsbad, California 92008, Attention: Mr. Mike Roston SHALLOW SLOPE SLOUGHING CARLSBAD PALISADES CARLSBAD, CALIFORNIA I Woedwa.Clyde 'Consu:l:tants August 30, 1-977 Project No. 57372W In accordance with your request we have made an inspection of the existing slopes parallel and facing El Camino Real and TamaraGk Street at the eastern boundary of the subject subdivision. The purpose ,of our inspection was to document the shallow slope failures whfch have occured and to express an opinion relative to the c'ause and effects of the fa il ures. Inspections of the subject slopes were made by Mr. James Cavallin and ~1r. Richard P. While, engineers of our firm, on August 19, and 23,.1977. The slopes in question are approximately 45'feet high (maximum) 'and in- clined on 1-1/2 to 1 (horizontal to vertica1). The'se inspections revealed that portions of the slopes have suffered ?hallow slope sloughing. The ar~as involved generally ranged from 40 to 100 feet in width, and involves the lower one-half to two-thirds of the slope. An examinatio'n of the scarp at the top of the slipouts indicates that the failure.s involve the outer approximately 12'to 18 inches of the slope. It was, noted that, the slope covering consists of a long-bladed grass with a spar'se to moderate growth of b~shes. It was also noted that soil appeared to be saturated to the depth of fa i 1 ure and that the soil in the outer zones of the slope appeared to be clayey to silty sand ranging to lean sandy clay (compacted fill).' . Based on the results of our inspection and a brief review of ,our fHes, we present the following conclusions and recommendations at this time. (1) It is our opinion that the most recent type of faill,.lres suffered by the slope are similar to those which have occured previously in this area and are not deep.seated and should not endanger structures .at the top of the slope. Previous failures have been investigated at the subject site involving the same slopes and reports concerning this problem have been issued on May 12,1976, June 14,1976, and January 12,1977. Consulting Engineers, Geologists and Environmental Scientists , Offices in Other Principal Cities Douglas Southwest.rporation August 30, 1977 -• Project No. 57372W Page 2 V.dWard-Clyde Consultants- (2) It is our Opln-10n that the outer typically loose,near sur- face soil and vegetation of the slope became saturated during recent -rains and slipped downslope in a sheetflow under its own weight. It appears that the relatively wet (saturated) zone and the zone of - failure correspond to ,the depth of roots of the vegetation.-It is recommended that a landscape architect or contractor be employed to study this problem further and to determine if the slQughing could - be related-to the type of slope planting employed. (3) It; is recommended that after the area has dried, the existing sloughed material be removed and the scarp area be filled with granular soil, the slope trimmed to the desired slope surface and the area re-planted in accordance with a landscape architect's racomme~dations . . (4) It is recommended that future irrigation of the slope tie carefully controlled such that only enough moisture is supplied to support the selected vegetati~n. - If there are anj questions concerning this m~tter, please call or write at your convenience. WOODWARD-C~YDE CONSULTANTS -1 I /' '-.'. .' '-.-,P/ --~ '~' ~e~.C L-, L./ Louis J. Le R. E. 14129 LJL/RPW/1 km (4) WESTERN REGION' ;3467 KUlll Sir ecl San Drc!!o Cahforni.) <;)2110 Phone (714) 224 2911 • WOQOWARD-'ClYD,E CnNSU1TANTS CONSULTING ENGINEERS. GEOLOGISTS AND ENVIRONMENTAL SCIENTISTS . lJanuary 12, 1977 Project No. 73-130 Douglas Southwest Corporation P.O. Box 1114 Carlsbad. CA 92008 Attention:' Mr. John C. Douglass Jr. Pr.es i dent SHALLOW SLOPE SLOUGHING CARLSBAD PALISADES CARLSBAD, CALIFORNIA In accord,a=nce with :your .request~ vie have made an inspection of the slope paralleling El Camino Real; nQrth of Tamarack Street, at the eastern . bOllndary of the subject subdivision. The p,urpose of. our ;,nspection were· to document the shallQw slope failure which has occutred and to express an opinion relative to the cause and effect of the failure. An inspection of the slope was made by a project engineer of our f4rm on January 10, 1977. 'This inspection revealed that a porti·on of the slope' behind building pads 71 through 75 has suffered shallow slope sloughing. The area involved is approximately 70 to 80 feet long and covers the middle one-third of the slope. Our examination of the scarp at the ~op of th~ slip:out indicates that the failure involves the outer, approximately 12 inches of the slope. It Itlas also noted that the slope covering consisted of a relative shallow rooted grass covering. and that the suil appeared to be saturated to the depth of the failure. The soil in ... ~- the outer zones of the slope appeared to be sandy to clayey silt. A review of our records revealed that the iTope in question is composed o'f compacted fill, approximately 46 feet high a'nd,icnclined on 1-1/2 tal (horizontal to vertical)·slope. =-~-, . Based on the results of our inspection and a brief review of bur fUes we present the followingconciusions and recommendations at this time: ·' ','7 /' Douglas Southwest ,.oration Page 2 .. '" Project No. 7~-130' . January 12, 1977 1) It iSQur opinion that tl:Je,type of failure suffered by the sl~pe. is not deep-seated and should rtot endanger stiuctures at the top . of the slope. . 2) It ,is our .opinion that tAe outer typica·lly loose, soH on the. slope became saturated d~ring recent rains and slipped, down ,slope in a IIsheet flQ,w'u' under its 'own' weight. 3) It is our op'; n ton tha t the type of fa i lure suffered by the slope is r:lot uncommon with one'and ,a 'half to .one inclined fill slopesi particula.rly during periods of heavy -raihfal~, S'uchas that experienced in the San Diego area in ,the p.astweek, Over-irrigation.;s another typiqil cause of this type of failure in one, and ahcl'1f to o.h·e sTo.pes ... In contrast to this" ·our experience ,over the past few years has ;'ndicated that two to one i'ncl in:eo fi 11. s 1 ope·s .ao il1qt 'experi,.ehce thi:s sort of failure nearly as often. 4} It is recommended that fal 1C)W;.ng, a few .da,ys o:f drying, the sCgrp . area at the top of the slough be filled with gra-~ular sO'il a.nd replanted .. 1t is further recomm'ended that a ,deeper ·tooted slope 'coveri'ng of bushes and small tree's, such :as ·acacia, :be 'employed over th.e slOPe. A "·a:ndsc;ape· architect or contractor should 'be 'emplQyed to determine the proper slope COver; ng .. If there .are ·a.ny questions concerning this matter, please ca.ll br w'rite at your ~onvenience~ Very truly yaurs, ItJOODiMRD-CLYDE 'CONSULTANTS d. /li._/k1~ ~l(~~"-----'. JC/hm (4) ",'\.. ' ---"--'-="'"--• • WOODWARD-CLYDE CONSULTANTS CONSULTING ENGINEERS. GEOLOGISTS AND ENVlr10NMENTAL SCIENTISTS PROCEDUR~S FOR MINIMIZING· SLOUGHING OF 1-1/2 TO 1 SLOPES tARLSBAD PALISADES CARLSBAD ,CALIFORN IA ,"' .~.'~ ~', r~ ...:.: .• j ... ~~::;'~1f,,~\!,~~:';:~' ~:.>~",:i;~;·~~~;;;;',··;·;::~~::;~.~t .~J~:~~:.'~~~::;.~;:;~:~ .. ':.:::;.:.~: :.,;'::~::'.":~~.~ ~.:' " "~.:.~: '" '~,. . . .' '" ~\' ... :"l.".~ .... "" ~-.t(~,.~, ..f"i';.r3..; *",~ .. ~I->.},~ _:~·.ottt!~,i1!,t; .. ! ;-"', .,,<\.> r,' ,n'~ ~I\: ~~. t'b\..~ l~~~"';..; .. "t~: ';'.i~f.~.~"""" · .... f~'~J. la.1Wo... '. " :' ..... ..... .~ .... ~ .'.,. ~. ., • ,-) .. :.0 ", ... :" ..... .010 .... ~ ... """ • ., .,.<' • .,...,./ .~~'. ,.. t'":. ,.1;''''6"" # ~ ...... In accQrdancewith ou.r' proposal .dat~d Narch 4, 197.6, we' are' presenting some prbcedur:es"'rpertai'bing';"to'~the"stabi'~'i za,tion',of"*,ttta,,o'uter'$11 ay~rs,y.of· .. "r··. ", •. :. soil in 1-1/2 to,l'fill slopes. TheS.eprocedt.,lresa·re bas'ed'on research, into available' information and .pub] ications concerned with, s'lope stabil i:zation and ou'r .experience over the years with this problem . . The slope ;slGughihg ufrder questiofl l,S the i;ype ,of slope' instab.ility ...... , ~1't4"_ . typi ca 1,' of 'what"'occuts"on4 !llgrw:·s.,J opes' i,n ... 't~e'''·San ·O~ ego, area· constructed' . . ". I", ': .:, 'at!:inc1inati;Ohs}~(~)"f:~'J,:,;llZ':~to. t/.on::st'eel?er;;'-0:~T~~'~,<;a·u.ses>o:f~?'sUCIl,::sloughs·;'il:..·, ,: ' . ;.,./ 'a're genera l1yass:o'Ciate'd. wi th'''Yo·6se'ning:''·b~r;·'~11r;Tace:,:"s'o{1's',·:tcfue~t6''·Weat})eH ng'.~'·~~.'~';:': '~!J>:>':" "-.'":' ~ or langscapi'ng"'procedures' ana""concen,tratton-():f,~water.~due".t.o, ... ;;t.,r.igat.i.QrL, ...... ~ ... " .. ,., .... .-. .. or ra ~n. The s 1,P,U9h,ing i sg.~ner.:a 1](1" 1 ilt}i.~e$·to\:,~,!;i.~{«)qq,\.J~~r:)~ ,.to } ~:e:~. of. ' matet:'lal on th'e slope and should be 'treated' as ~part of no:rmqJ ,erQs,on'~ /. ama intenane-e. ' TOi styp:e :a'f sl{)u,ghir:l:g. j s notde'ep~seated, qf) pr'i g,if( and' does not· res.l;l;.l ti1n,ca t'a;s:tro:prr~~.':·damage.) tQjie~J:Q.e,gF~.~l-. .wadj,ac.~n·t pr~p.,~~~ i e~~ . ... •• "'. ' ...... -_ ... -... ... .. 1....".. -"''1'''' , .... ~ •• ......-, .... ,"'-" .... "'.40 .. -. ......... 4'! ._., .. _ .. to< .... ,:~" --..... 9~.Ji\H.j .......... "'" ~ ...... ....:,l.u .-.;..~i· . T~e .f?l1owing paragt.aphs eons.ti~~te;·,pro¢:~~~.r~s :~:h~~"C~~)d::,b:e 'employed' ·to :ml mml ze the ·s] ol:1gh1"n,§ pr;oblem.v\o\ 'to. "-, , " ..... "'. ';';";' •. ' <.:-\":'; ,' .. '.. , • _. \;; Of·: 'tf' -.'.~~ .'It' ': ',~ ~",":.\ I· ••• }· ', .. -t',l.\il,.~,,! .,.',,1 \. • ..;II"" : :~ • ~ • It, ..,. t. • ... , t;. ",.. "'''~ ,"'" ..... • \. _ ..... ~., .~ ...... .. ~ -. A." , .,' • ~ . , • • ,'" .. ' 1 '1" 1;' .... .r 11;' .... • • u, '" " '.(l) It ,has, ,been "Our ;exp'~rH~l',lce'':1;n~t~''l:Hle ,:Qf,::the-must"'effeettve ': t , methods of milTimiZfng, sv.rfac;esl:Qug:J:ting 'is ·to oy~.rpuH:d the s1op.e.s,""say , ,3 t~ 5' feet 'du~,ing 'grad;:ng; ... ~.nd ~nen ":'c~t.:bac~;~.he :~{op~ ~n .~h~ ,desir~d . >des:} gn s J op'e ·wlth doz~rs ,·.:grad~ VI S .:or oth~r·'. cgnvement places qf eql.n pment. Th is ,pr.ocedure,Jresu·l ts ~,A~rda; debse'r.. .. slQP~.J.$~;nf~~,elwh.i .ch:~ttt:mQre ,~; ilJperroeab 1 e. .. a,~t,l e'~~ } ~~e;,ly~ ~t,~.~r9de ~;>.~J,tJ ~BP,e.~Ts~i~~ k,b.e~',~arti,c;ul arJx,~~~~~~tiye ,1Ja' . r • . ~ . granular o·r 0·nJy.:s11ghtly~c.ra~ey,~S'o'il~!<.;~ndji,1'-s')igel1era:l\1'y'~les's.l\effectnt~.. " '. ,; ,: .. ';t '.~M.t!.l"l n ,(:'1 ayey).s'oiJs';1;i..The:;, res lIl:tilnt:t.s.1 op~ '.{;f(owe·v~I:;,~may~,b~~,QJ ~f,Jc,!;itt.~ to ~{~~ " ~,' "'.. .'-"~ 'Plant due to ,the i'ocrease' ';rfdens;ty 'a'ndmay 'C:~'tis·e s0111e '1 a'rids,cap.ing." ~ .. " """ ,A."; ,._".,.. . ···"'''··prob 1 ems"l<'''~\''':.~+'''''''~'<I'''''''~!1''I':I." ~>.! '. ' ', .. , . '-_ to •• \ -. •• ~ " ~V1";:''''' ·1."':<:·f,~~~~~~~~~~-\nol't"1t~~~~;~""~!~n~·~1t~~ S'H"'A#x'~1~,,*~.':~ .Jl'\~"" ~""*'~').-::~1?"",~ • " '. ' ,~. • "I~ .~,,,, .. :to .. _. -, ------....... -.. -... ~. uglas Southwest cotatio'n . Project No. 73~130 . June 14, 1976 I Page 2, . .... ·>,.r:.::' .. i::'l~' :-,,:. ~~',:~~:-:::;-:::-,j:::,.;>: .~.:~.~~:;.' :~;~.::,:~:.~~:~~~~~:~~.~~i~i:'v.:;'~Y;;;~;;'tE·:/·.,~:' .. ~ ~~':~0~~~ '~\41~ ~.;'~':~:'.;~~~:.:~. ;;S-',:~ it: ~\:~'i,('~~·.-'::,~;;;\~! .. ~: ,+: ::;.;::::~t~!'; ' . ... .... ... • ,I'.J ... U 1 .... _4W"''!.,: ...... , ... ~'\., .:r~ .. r;<,,1J ..... ..,J'('".\i.-.,~ir,t •• ~>t"l.., ... ~"!C}.JJ 1"0 f.· •• ·O."-'.'I..:Jo.:t· .. :.r'\...~.~ .. ~~fr-~~.'lh.!."'i'~.t"''''" -\lo/·'C"r"~·t\~·~ k'( ..... ~' ...... ,...'\."'~ .... 1'.;""1.., ••• '''~''~ 4. . .' .. 'J .. ". '( 2) .,.~. Experi';n~e 'has' ·s'h~~Jn!'·t·har:'ii' ~a'r'i'et?'dt~'egettati'on' -p~op:er'1y"~"~":':;':~;:';~;9~::t< ,.'~ ~' .. ~?:::xr' '.' . . installed help·s··min·imize-slope· .. sloogh·ing·;·· ........ The .. vegetation"consists of ',. ,~ bushes and ground cover having variable root depths. It should be noted that careful maintenance, is. necessary in the beginning a,nd that the slope is generally vulnerable to sloughing until the root system 1S well established. A landscape architect should be consulted for a proper seed mix. " ~ " ' • c,' • _ • ,,' ',' \.' ~"~'1 • ';'" ,,' ';" <.,',,':' .; " :;,: ~ :.:"': .":,;; : "":" ~':"I;:v~,,~·~i", .'If~;/~~-:~'~" •. : ~:~ ;~ •. ~~',,~.~ ''''~~~~:;(;/~';;'' ':. "r''': n· '." ,;,-:::::' ~ :'~f. !~t, ,;'" \ J (.~) ~<~ut~}ne:tti ng~h~s':·:b~~n~:emp~.oyedf", in;sa~dy/s_bfl.~:~an.(L~~~PP.~'~!~:::~~.O~~f~;~i:~~E?·::':f/{::;:":;--. . help mlnlm1Ze the'formatlon"of erOSlOn gullles and helps malntaln the-'>" ' '" -.>- ",'" ",' '''-, .... '' .. soi'l on ·"the·s·l ope" unt i l' vegeta ti on~'ha5'" a""'chance··to·"become "estab 1 i shed""~·~·-.' ..... _. ~--' " .~~ .. ~.,,~. This has been successfully employed in various areas of San Diego County,' (4) Wood cribing, s~ch as 2 x 61 s or 2 x 8 1 s constructed tn 5 foot squares, can a,lso be employed; this is generally expensive and is a procedure having a function similar to jute netting, to help maintain , the surface of the soil .until"landscaping. has become 'establ ish~d ..... Along"~ . " ,"-· .. t~, . . '. with,. thi s. procedure':, a.'pproximately:.5 ,feet:.J o'ng,' steel,.r:ei nforc,tng bars,'can.· ...... , -~'-". -. '. be driven, 'vertically into the slope'on ap'proximately'5 foot centers 'to' ,~' . .. hold the'cribing or netting'in'place"and"provide"stability"to'a,greater" depth. (5) Stabilization of the outer layers of soil with additives such as lime or cement, has generally not been employed in the San Diego p'rea; hm'/ever, it'is a possibility and could be considered in extreme . conditions.:'·'Landscaping'of"the slopes'will' be'difficult with this' . , d' . ,--. ....... . '.. '.' ." I ); . "l: J' • '. "" h.... ," . t ........ ,.:,/:::,.r~r '. ' ... ".'. ...~. ..' .... . > ~ ,. proce ure ."~'i .~ ... P--.;o. ~ •• " .... "" .'! ... ~ ... : ' .. .« ""ir~:' }-'\. tr"".:'t :;,.,..,.,.;..1. 3,1.,-,. '" • '\j.t '\"', .• ,... I .\:': .. ' .. · •• ·v ,; I' • • ... -..... .... :,' .," ," . ..r~::"""~' ... ~ .. ~;.. ... .o;..l ••• \.-.;.~,-:\.y_:: .. ~:: ... ,..;:.~ ........ \..t.,:"~.o4,'~':"":::;"fJ'''.~~'~··'''-'~~\·'.' .... w'l .... :,'1 .. ,<~/.~/~ ... _".'!-'J:, •• ;). ~~·.t.·· .. ."#i!~·"t?II ... '.'.~·,,.~: • ~··~I.. ..f"'::~_ (6)-' -An' important factor-in·,any procedure,to,minimize,sloughi·ng .. of .... , .. slopes is the control of water falling on the slopes ... While it is not practical to control the rainfall, careful contrciT:~f' irrigation during the summer months can be employed, .such that only enough water is applied to maintain the life of the.plants. ~lt:5s also jmportant, that good~, slope dra i nage. be ma i nta i ned and, that no .. wa ter be a 11 owed to dra i ri oyer the slope or no ponding o~'water be allowed abo~e the slope in pad' . areas. ,.,' v < • As mentioned previously, the abqve, procedu·resare. intended .. to·minimize sloughing of the soils on the 'slope.' They-are not'intended to eliminate the problem ~nd'periodic maintenance may stil~ be required locally. If there ar,e any questions concerning, the above recommendations, pl ease call or write at your convenience. , ,\,' .. , ...... ~~t:..:::.,.,.,;'$'fI~"'r .... t ... "' ................. ,1..', •• J" LJL/RPWwe :r" .' , ., ~ . (4) WOODWARD·CLYDE CONSULTANTS • ' •. WiO.:OiO:WA:R:O-CtVD.E C.g·NSULTANTS WESTERN'REGION 3467KurtzStr~et San Diego California 92110 Phone (714) 224·2911 CONSIJL.'I"ING ~NGJNEERS. GEOL.OGISTS AND ENVIRONMENTAL. SCIENTISTS ~1ay 12, 1976 PrOject No. 73-130 Douglas Southwest C0rporation Post Office Box 1114 Carlsbad, California 92008· Attention: Mr. Steve Minor SLOPE SLOUGHING INVESTIGATION CARLSBAD PALISADES CARLSBAD, CALIFORNIA In accordance with your request and our proposal dated March 4, 1976, we have made an investigation concerning the recent Sloughtng of the fill slope at the rear of Lot 4 facing on E1 Camino Real at the subject subdivision. The purpose of our investigation was to determine, "if possible, the cause of the sloughing, to determine the ground conditions in the slope, and to present recommendations for slope rebuilding. In regard to. this latter item, the slope h'as been reconstructed; therefore, our comments will be directed to the adequacy of the reconstruction based on our observations in the field during slope rebuilding. Field Investigation The field investigation for the subject project consisted of visual inspections of the slope at various times and the drill ing of a test boring into the slope from the pad above-the slope top. Visual inspections of the slope were mad€l on 'February 24, ,March 1, March 2, and March 9, 1976 by €lither a project engineer or project geologist of our firm. Two of the inspections were made during slope reconstruction which enabled the examination of the soil$ at depth within the slope. The test· boring was drilled on March 8, 1976, approximately 10 feet back from the top of ·the slope with a 6-inch diameter, continuous flight, truck- mounted power auger. The boring was drilled to a depth of 52 feet and a well point was installed at a depth of 50 feet., The well point was filled around with pea gravel and sand was poured into the boring around a 1-1/2 inch pipe extending up from the well point to a depth Of 7 feet where a dry bentonitic plug was established to a depth of 2 feet and the remainder of the boring packed with native sandy clay material. do.uglas Southwest Corporation Project No. 73-13. May 12, 1976 • Laboratory Tests ' PafJe 2 • Samples of the material composing the slope were obtained by the project geologist during one of the inspection visits. The samples were examined in the laboratory by the project engineer and visually classified. These classifications were substantiated by grain size analyses and the determination of plasticity characteristics on several representative samples. The results of these tests are found on the attached Figure 1. Slope Conditions and Reconstruction The initial site inspection was made by a project engineer of o.ur. firm and r~vealed the following slope conditions. (a) The subject slope at the time of our injtial inspection was approximately 52 feet in height and inclined on 1-1/2 to1 (horizontal to vertical). The slope was landscaped with a shallow rooted vegetation consisting primarily of daisies and grass. (b) An approximate 100 foot section of the slope had suffered sha 11 ow s 1 oughi ng to depths rangi ng from 12 to 24 inches from a point approximately midway in the slope height to the toe. (c) The material exposed was generally light grey si1ty to clayey sands. Several small water seeps were noted issuing from the slope at various heights. Shortly after this inspection,extavation of the sloaghed material and reconstruction of the slope commenced. Inspections made during excavation indicate that the soil conditions ·VoJithin the slope generally consisted '. of alternating layers of compacted silty to clayey sand and lean sandy clay having a.mottled coloring ranging from light grey to dark brown. At this time, it was ~pparent that the outer approximate 1 to 2 feet of the slope is primarily silty to clayey sand. During excavation, a water seep was noted near the toe of the slope and another on a conStruction bench about midway in the slope excavation. In this regard, local information indicates that ponding of water occurred above the slope at various periods during the rainy season. The test boring drilled above the ilope revealed well compacted, damp, grey to brown silty sands, clayey sand and sandy clay which extended to a depth of approximately 49 feet where a 2 foot layer of recompacted topsoil consisting of sandy clay was encountered underlain by dehse poorly to moderately indurated sandstone of Tertiary age. No groundwater was encountered in the test boring at the time of drilling. MeastJrements were made periodically during the slope reconstruction and no grOundwater was apparent in the test boring during these inspect·ions. The la.st check on the well pO'int was' made on ~1arch 17, 1976. WOODWARD·CLYDE CONSULTANTS DouqlasSouthwes.t "orpora ti on Project No. 73-1 May 12, 1976 . Conclusions and ~ecommendations • p[j(J.(~ 3 (1) In summary, our inspections and test boring at the site :j.ndi·cate that the slope is composed of compacted layers and lenses of silty and clayey sand with sandy clay with an outer 1 to 2 foot layer of silty to clayey sand. Results of our test boring did not reveal the presenc~ of a groundwater table within the fill. It is our opinion at this time that the water seeps observed during slope reconstruction are most probably associated with ponding of water above the slope and are of a temporary nature. (2) Based on our inspections of the slope and our experi~nce with similar slope failures, it is our opinion that the cause of slope failure can be attributed to the 'typically looser soil on the outer edges of slopes becoming saturated during the rainy period and slipping in a "sheet flow ll under its own weight down slope. The water seepage probably contributed to the sloughing. (3) It is our opinion that the material exposed in the slope durtng the reconstruction procedure is a material whic~ has sufficient compacted strengths such that deep-seated slope failure is not likely to result. This conclusion ~ssumes no excessive hydrostatic pressures exist within the slope; none· were indicated by water level measurements in the well point installed in the slope area. (4) Based on a review of our final report of slope recqnstruction dated April 23, 1976, it is our opinion that the subject slope, as recDnstructed, will have adequate indicated factors of safety against deep-seated fai1ure~ (5) In order to minimize the possibility of future sloughing, it is recommended that the depressed area, causing ponding of water above the slope during rainy periods be provided with positive surface drainage. and that adequate landscaping maintenance be provided. (6) It is recommended that the ~ell point be monitored periodically during rainy periods for the next few years as a check 6n groundwater conditions within the slope. If water does accumulate behind the slope, additional studies may be required. If there are any questions concerning our slope investigation, please call or write at your convenience. WOODWARD-CLYDE CONSULTANTS LJL/RPW/jd (4) Attachment WOODWARD·CLYDE CONSULTANt~ (!) z: (/) en c( ~ t- ffi c.> 0<: ~ ua."M ~_ ..... ___ •. COB8LES......--~~----~t---.,..--'-~"'-y---~ 81 LT ancj Cl.AY Mesh Openlns .. Ins. _81 eve Sj les Hygr6meter Analysis __ 100 7 6 3 2 .1 ~ ..L ~ 10 16 20 30 ~O 60 80 I~O 200 o r'.. __ :0- ":-~ : .... 90 :, 10 \ I\, \. 80 \ 20 -' _\ 70 1\ \ 30 60 1 \_. I \ \ 4 -' -\ \ \ 50 ~O 30 20 10 o \ ---\-. \ ~ - L\ \; 5 ··n· -----r--' ~ -\ "X ----"'-\. .-_S _ .. --..... r-..... - 1-- 100 50 10.0 5.0 1.0 0.1 0.05 GRAIN SIZE' IN MILLIMETERS SAMPLE CLASSIFICATION AND S~IDOL 1 Sil ty sand (SM) 4 Silty to sandy clay (CL) 5 Clayey sand (SC) *LL = Liquid Limit *PI = Plasticity Index GRAIN SIZr; DISTRIBUTION CURVES CARLSBAD PALISADES SLOPE STUDY \ "\ , -- \ \ 'I. 60 ~ -'\-.. " "'-70 ......... . " ........ ........ '" -"' ......... , ~----.~ ""--. ...:. 80 -" 90 0.01 0~OO5 100 0.001 *LL *PI 33 12 37 19 ---- DRAWNBY:_ALS I CHECKEDBY:~f0l PROJECT NO: -73-130 I DATE: 5-11-76 I FIGURE NO: WOODWARD·Cl VDE CONSULTANTS ---~---"----'~--'~~~~~~~~~-----=-'--~-'"----'----------------------_ ... . ' , j.-.. ~I· •• ' , :t'. • • ~,"" • , w 'I'I'I~ iii' • WOODWARD-CLYDE CONSULTANTS C6NSULTING ENGINEERS. GEOLOGISTS AND ENVIRONMENTAL SCIENTISTS ... ..... f' ''1'''' In' " .... ., ... ~-r, ."~t' .~ ..... ~ ... , · .. " .... ·• ......... -';-..,!I:f~.,'·.·I·:~";"! .... f ... ·;···~~, ,'j"t .... ~....... ~. ","'.p_ •••• , ....... _? ... "~~"".'. f/ ,. ...... SLOPE SLOUGHING INVESTIGATION CARLSBAD PALISADES CARLSBAD, CALIFORNIA . In accordance. with 'Your request .. .:ind,-.our. ·proposal. ,dated Mar.c;h 4, 1976, we have made ari investigation concerning'th~~ecent slnughing of the fill slope at the· .. rear of. Lot. 4 ~facing~ .. on.'.E1."Camino: Real .. at .the .. subject .', subdivision. The purpose of o~r 'investigation was to determine, if possible, the cause of the sloughing, to determine the ground conditions in the slope, and to present recommendations for slope rebuilding. In regard to this latter item, the slope has been reconstructed; therefore, our comments wi 11-be di rected to the adequacy of the recons tructi on 'baSed on our observations ·in the,~ield.du~ing .slope rebuilding . • ~.! I~~ -' .. ::~,;~.~" .~ .• ::.:~.:-.:-:::.:. ~!~~'.: .·:)~"~~t:·t: ~ ~:~.;: .. ". '~;~;:~_:"~.~~;'.;I;·~ .. ·; '+t':~"'r ~ .l.~.' :;';. ::.:: !fl~~~{:~. ':" : .. ',~': /~ ~ z; ':> ... f'~ ••• ,\: .~.>::. -:-~ . Fi e 1 d I nyes t, gat 1 on . : .iI.. • .... ,,< ... "",.;1 ,.:::\:{·t,;:: ... ·~~·1 \j, .... ',t.~ ~ ' .. >; :.: .. :.:.-:! ..... ,"~ ..• ,.: .. "' •... i::. ,.::::.~.> ~ .. .?: .. ;,~ ,.' , The f'i e 1 d i ~~~'s·t~i·g;tio·n· .. f'~;NPthE;·"'su·i:d e'c't' 'pro'j ect cons i's'ted of vi suaY" .,~. inspections of the slope at various times and the drilling of a test .' . .. , '" .. ",.' ,boring into the slope from the pad above the slope top. Vi~ual inspections of the slope were made'on February 24, ~1arch 1, ~1arch 2, and March 9, 1976 by either a project engineer or project geologist of our firm.' Two of the inspections were made during slope' reconstruction \,!hich enabled the examination of the soils ~t depth within the slope~ The test boring waS drilled on March 8, 1976, approximately 10 feef:back from the top of the slope with a 6-inch diameter,'continuous flight, truck- mounted power auger. The bori ng wa's dr·j 11 ed to a depth of 52 feet and a well point was installed at a depth of 50, feet .. The well point was filled around with pea gravel and ~and was poured into the boring around a 1-1/2 inch pipe extending up from the well point to a.depth of 7 feet where a dry bentonitic plug was established to a depth of'2 feet and the rema i nder· of ·the· bori ng···packed "with'~ nat; ve ·.sandy·.cl ay. mater; al. ; . .< .'-t \. • It" • ~ • :', . ', ..... ::.1';.~,; .. J: .. ;.\ .. ; :. ,':::' , .. ~'.>.: >;>'.:5 :: .. >{:.<: ... .'.~ ... >::: '''':''> <~;.:.,.'".' ,)., .... < .. :, .... 1.,,::<:, " .', .<" .• .' •.. '. :. ...' ..... ,'f!:"" .... ~ ~. .' , .' ' \ .. .. '.l ....1 'J .~;~; 'I' .. ,'.l' .. ug1as Southwest co~orat;on Prbject No. 73-130 May 12, 1976 - Laboratory Tests Page 2 • . ~. ' ...... ~: .. "~':~ .. ...:)~ . .f;~-:",~~ ;·~'''>~i:·;.;~:l:::~"'::'';~17'~::~-::~,:''·:-~~:~r~;'<:e",~J,J:~~;;'~0::;'"l~:'~'r":~;',1~,.~'>4 J'·:~:,~.~,.t~ .. _,. ., .,~~~.,~,~ ~. ."_ ~¥~~ ~~, ... ~;:"'Samp 1 e~ '~of,:, 't;h~ ,:.ma teri'~"/co~p~s,i ng:~:th~~.,:s.:),~·p~ ;·\1~t~'·~;db~~;i;~~d:>,bY·:;:th.e:~ ~t:oj ~.c_V::i;·;~.:;<·:;~·:;::~~~~~,~~,,· geologlst durlng one of the lnspectlon V1SltS. The samples·were examlned . ' .. in' the'laboratorl by the project"'-engineer :and visually classifi.ed .. These classifications were substantiated by grain size analyses and the determination of plasticity characteristics on several representative samples. The results of these tests are found on the attached Figure 1. ,_ Slope Conditions and Reconstruction.", ('~ .. , ", ... _ ... ,4 .. ,._ "' ...... 1 '..... "_: ' ••. • .. 4 :~ .. ~ '. .~ .. ;' <*~~ ... : .: <:"~':~';~":~~~:"':""~';':'::"t'~~·,1 .. >T"',~~.f. ;': ~:":~ ::f~·~ .... :r; '~.~t-""ko;'\~~~::;::,~:~~~>.,.L'l ~':":<~pi:":"~"""" . ,I' ~ <:'* ~:-: .~~,., .. ~ ~ ~~ .. ~: .. '~\~~:.-,(':.:~ :_: .. :. ~~: ;~/;~, ... I :'~-:>I·~.~~r~::4; The'initia,'site inspection was' made by a proj-ect'en~ineer-of"our' firm" ; •. _.,"" ...... -, .. _.M,'''' ~"'''and''''reveal ea'the'Y"'fo 116W; n'g'~-s'TbP~"'''eondi ti'ons: . .. "~" ... ' ........... ' " .... »~ .... ' ~'" " .... . (a) The subject slope at the time of our i niti.a 1 i nspecti on was approximately 52 feet in height and inclined on 1~1/2 to 1 (horizontal to vertical). The slope was landscaped with a shallow rooted vegetation consisting primarily of daisies and grass. • ,--... ---... '¥ , •• 0. .... \. ... ~ .. ", '-~"_""""'''-'''''''''''''''''''''''' ,,. J .4, ,_, .'.~ '';~'\H .::-,.: ~ ' ... ",,: . .,:( b),:.<ll:n .. ap·p~o~ima:·te··i Q:O :';';ot:'fse-c'ti'on: '~;f' :t'he: ~, o'pe,"'had: ~'uffered ~ .... ~' ,,; ... .-~f':~>:' . shallow sloughing to depths ranging {rom 12 to 24 inches'from a-.' ¥ .. poi nt apprdxima te'ly"mi dwaY"'i n 'the'.;slo·pe1'hei ght;··to"the ;'toe':""~ -". ",H.·,-..... ,., " (c) The material exposed was generally light grey silty to clayey sands. Several small water seeps were noted issuing fro~ the slope a~ various heights. -, .~ ,', .. ~ .~ .Shortly aftef. this inspection, excavation of the ~loughed material and reconstructi on '\ of. ... the .. s 1,ope,',(;oJ!lQ1en,ced .. ~::]<Inspec.t~ ons "made: duri ng' excava ti'of}, .. , indicate that the soil conditions within' the slope generally consisted' . of a lternati ng 1 ayers of compacted .... s i-l ty"to clayey .. sand·, and·.1 ean .. sandy "'~ clay having a mottled coloring r.anging from light grey to dark brown. . , , "\ "\ " ' At this time, it was apparent that the outer approximate 1 to 2 feet of 'the slope is primarily silty to clayey sand. During excavation, a water seep was noted near the toe of the slope and another pn a construction bench about midway in the slope excavation. In this regard, local information indicates that PQnding of water occurred above the slope at various periods during the rainy season. " ~he test boring drilled above the slope 'revealed well compac~ed, damp, , grey to brown silty sands, 'clayey sand and sandy clay which extended to . a depth of approximately 49 f~et· where a 2 foot laYer of recompacted topsoil consisting of sandy clay was encountered underlain by dense poorly to moderately indurated sandstone of Tertiary age. No gro,undwater was encountered in the test boring at the time of.drilling. Measurements , were m-ad.e. per; adi ca )1.Y" dlir'j ng,'-th~"'s 1 optt·recon-sth.ic'tfo·o-·"a'nd no"groundwater .-.. ' was apparent,"in' :the:",·test:bor,ing~.during~-th~se;,inspections •. -·;The last:·:·· ... ':.,) ,- check on the well point was' made on March 17, 1976, '>/~'-.. , " • I hi "'-~ ....... I.t .. _l.~" 'tt '''''-''t'I.,1/' 'l·.I'~~ .. .,.,~' ... t-t"J\"',i? "'t~"9.,1,~! ....... \-I·""~ ... -t ... ''t .. 'l ... t>-t\ 'f"" j'\ ~~to'fr'" '\' If ~ 1 .... :~1~"~~ ,t.--..... /. r-PlI"," f' T 'I. ... ": • ~1I<"l • • ""'at" ~ ~"-r'''' .,'1"" ' .. '" ~ II", ~, • -... ~~-. '-..... . \- WOODWARD·CLYDE CONSULTANTS .. , " .: oJ" ~:_" I ..... 1' . ; ... -", L)()Ug I il;; Soutflwes t Cor'Pora 'C'I on ",...,-f Project No. 73-130 .' .. .7"/ t~ay 12, 1976 Conclusions and Recbmmendations Page j • • ," "J" ~. '~."" , ....... , " .. .,.,.~'<'\-.... ,.~.~ ... ~ .. 1;~(1'· .: ..... ~:.t"'.~:· ......... )' .. t:.~I'~~~ \~\ ....... ;./~"" -""I'.,,,,,,,~,~~~, •• :f.j"'J':":' ,:':. ; '; • .'K","sl .. '1 ',~~' " " ",' "" ... .. '. "'" t i. "1".' • '~~ (T)" ;:·Ih '.sLiinm'a'ry r;,QLir,.:':'i ,'fspect,i QnS"'I·arid.:':test':~boti.ng,,7~t ;tbe·),i :te',:j·hdi ca t.~ ':. .. '~;."'.>/~:.;>'-: . ./ that the slope is composed of compacted layers and lenses of silty and .. . , clayey sand wfth'''sandy c'lay"w'ith an' outer"l'to 2 foot layer of silty to clayey sand. Results of our test boring did not reveal the presence of a groundwater tabl e withi n the fi 11. It is our opi ni on at thi s ti'flle that the water seeps observed during slope reconstruction are most probably associated with ponding of water above the slope and are of a temporary nature • . .... I,'" .' , .... "i; •• 1<.~ ........... -.,..,..'t".~.; .. ,(~.' >-\.," .~ ......... ,:-r ••. '.~.(' "'4""" '/o,,;:~' .. 4.' l' . ~: .. , " .. ,.' .......... , ....... ___ ,'. ... ... r , . ,": .. ". ','.:'.," .-;.:~; {2l""~' ·Ba·sed~··oh bur·i r'l~pe~ti oii~' :9l,~the~.s 19P·e~·an.9;b,~f~~·expe.t'i ~nc~~'''wj th ~.~~:, :)<,.:\: : >.:.~:;:>:, -similar slope failures:' it is' our 'opinion that the cause of $.lope·failure '''''' .... , ...• .," -f' ., ..... " , ·"""can""be'"aYffiolrtecrto·"tne, .. tYj:5'i caTly-'T06s·er· ... s·oi 1 '<dn-"'th~~o·uter·-edges 'of"' . ... .. --~, slopes becoming saturated during the rainy period and slipping in a "sheet flow" under its own weight down slope. The water seepage probably contributed to the sloughiflg. (3) It is our opinion ... th,at. the mate~ial. expos~ed, 1.1! th~ ,?)ope. . . ... . .. _., during the .reconstruction procedure is a material which has sufficient . 'compacted ·strengths~· such' :tha t:-deep--:seated . slope:. fa i "ur.e~·i s·.~not ·n ke ly :~to:~' ;': ~:~.'" '.! .~:~~:<. result. This conclusion assumes no excessive hydrostatic; pressures exist within 'the slope;" none" were""iricrfca'tecj"by 'wat'er':level"'m-easurements"'<"'" .. , .. · .... 1'· J. in the well point installed in the slope area. (4) Based on a review of our final report of slope reconstruction dated April 23, 1976, it is our opinion that the subject slope, as . reconstructed, wi 11 have adequate i ndi cated factors of safety against d t d 'f '1 '" .,.,,-,~. " .. ~ .... : ............... ',.' ... ' ...... ', .. ' ....... ' " eep-se~ e 'al ~r:e.· .... ·.· ... :t~.:~;;.:· . ..,..:·' .. : ... "':"';-!"'-':"'-.•.... _ ...... > .. ~' ............. , .. ': ... ', ., . . 1 ~,' ! ri,.:.,,::'} ,~~·.f.. ~ ,6 ; .. ~"~'~ ~~~ _ ::~~: ~~. ~~:.~l; .',:.~:~ ~~:~ .. ",. ~::.>~"/~,\~; .... ~~.:J:'~~~l\::r~!'~{·~.~ ·1~;~~,:.;j4. ~ _~~t,~*;~~/,:':'~ ~?{ }::~.;; ~:',: ~ ... ~~ ... :,~~:~.~~,~"f~~:::::~ '~~;'~~'~~!':L', ~",:1 ~;. "" •. ~,.~. . ~ ~ ~ .. (5) 'In order to·'minlmi'z'e··the·"poss'ibilitY·of 'fi.Jtur·Ef slougning::it'··· '. '.' .. '" "is recommended·-that·-the depressed-~area'-~causing' ponding' of·water·above·~ . ."''''7''.'' ·the slope during rainy periods be provided with positive surface drainage. and that adequate landscaping maintenance be provided. ~. 1'''.\' , 1, _ (6)' It'·...;s recommended that the ~el~,;.p0jn.t be.monitored periodically during rainy periods for the next few years as a check on groundwater conditions within .the slope .• If water does accumulate behind the slope, additional studies I1my be required. ; . ;'. ) '~" .'" ". ~". :( ....... ' •• ~ ... -r '.' -'o,.~,,, • If there are any questions conc~rn1ng our slope investigat',on, please -, can or write. at your convani ence·. " . WOODWARD-CLYDE CONSULTANTS LJLjRPWjjd (4) .. " .~~ .... , .. Attachment· } ,. ~ ~"" 0 ... WOODWARD·CLYDE CONSULTANTS <)..' ~ • I \ ( to • 1';. ... t ,# ".> '1..... ~ ..... to, '. . ; ,''' ..• ' .... ' •. ~., ':. ~. .. "! w' t< \" .. 10.... .. I .. SilT IJncj CLAY Mesh Open i n!) -, ins. Sieve,Sizes Hydrometer Analysis 3 2 I 3' 1. I 0 I 6 20 30 40 60 80 140 200 "~W' ~ •••• _.,.~ _, • _____ .,~ ..... ___ ._ o 10 I~ 20 \ OU-~~~--~~~~~~----~~~"--~~~~~------~--~------~IGO .' 100 ~50~~"~"" "1,0.0' 5.0" '1.0' , 0.1 0~05 0.01 ' 0.005 ' 0.001 'n" ., ,GRAI~' Slzt IN MI LLIMETERS .-, " SAMPLE, -, CLASSIFICATION AND SYMBOL -"'LL *PI " , ),,~ .... .. '(SM) " -Si i ty ':,sand " ' 33 " " l? . J ..... ' . . ., ., " -4' Silty to sandy clay (CL) 37 19 (SC) \ 5 -Clayey sand , ----' " .' . " \ . ' " , , I " . .. . . . , . , . /' ", . . '/ A::;'; J 'f Li~u~:X~·"~~;,~!; .:0; ;:;:~'~; ~~ ~~: .:;~;,~.":,:~ ;:: >'~;,; ,::, ,,:,.,:; ,,' ,",. : ',' .. .J ,' .... *p, = PI ast i city 'ndex .... , . ..,. ... "I}.'-. '.l, .... ;\".~." •• ~.;'}OOr t-"'l:·+~.~~'1-r':·:'I'::"!l'-·:f'" ''''':rl ".,.;.-o;";'l·~.'t1~·~t~r.\(rk~ 4 ~)l.,''''''~{J,-~:'''''':'''''i' I~\o;~'~""""" .... ".' ., GRAIN SIZE DISTRIBUTION CURVES CARLSBAD PALISADES SLOPE STUDY DRAWN BY: ALS I CHECKEDBY:~~ I PROJECTNO: 73-130 I DATE: 5-11-1'6 1 FIGURE NO: .~.. . .... " • t' ~ ,'" \" (' .... < ~" " - WOODWARD·Cl. YD~ CONSULTANTS -r .. ' .. • • WOO:Q'WARD-C1YDE CO:NSULTANTS CONSULTING ENGINEERS. GEOLOGISTS AND ENVIRONMENTAL SCIENTISTS WESTERN REGION 3467 Kurtz Street San Diego California 92110 Phone (714) 224·2911 ·April 23, 1976 Project· No. 73-130 Douglass Pacific Southwest P.O. Box 1114 Carlsbad, California 92008 Attention: Mr. Leonard Minor FINAL REPORT OF ENGINEERING OBSERVATION AND COMPACTION TESTING SLOPE REBUILDING REAR OF LOT 4 CARLSBAD PALISADES CARLSBAD, CALIFORNIA RECEIVED APR23 1976 ... In accordance with the request of Mr. Steve Minor of your firm, we have provided soil engineering services in conjunction with the regrading of the subject slope at the Carlsbad Palisades Development. These services included: . (1) Engineering observation of the grading operation. (2) ,Observation of the. placement of subsurface drains in connection with the slope rebuilding .. (3) Taking field density tests in the fill placed and compacted. (4) Performing laboratory tests on representative samples of the material used for fill. Site preparation, compaction~ and testing were done between March g, -1976 and March 17, 1976 in accordance with the IISpecifications for Controlled Fillll in the Woodw~rd-Gizienski & Associates report entitled IISoil Investigation for the proposed Rancho Agua Hedionda -63 Acre Site, Carlsbad,California,1I dated March 3,1973. . ~O~glaSS Pacific SouthW.-·~ / / Project No. 73-130 April 23, 1976 • Grading of the subject site essentially consisted of the excavatiori of a , sloughed mass of soil from the slope area, and disposing of this material Q.ffsite fonowed by placing and compacting a stockpiled material ;·n the excavation. The excavation extended 12 to 18 inches below the side0alk level at the slope toe and for a distance of 20 feet from the curb. An approximate 1 to 1 slope extended from base up to a bench 15 to 20 feet above the sidewalk. The bench was approximately 10 feet wi~e and the excavation sloped up on an approximate 1 ta 1 slop~ which day1ighted at the slope face some 10 feet below tbe top of the slope. Two drains consisting of a 6 inch perforated PVC pipe overlain by crushed rock were was placed; one at the sidewalk level and one on the b,ench midway in the slope. The perforation in the pipe were placed f~cing downward in native material. The crushed rock, a relatively clean open graded material, was placed over the pipe in a thickness of approximately ~2 inches. Fill material was then brought from a stockpile on the lot above and compacted into the excavation. Upon'finishing the rebuilding, the slope was track walked with dozer equipment. As the site grading progressed, the compaction procedures were observed, and field density tests were mClde to determine the relativecbmpaction of the fill in place. Field observations and field density tests -results indicate that the fill has been compacted to 90% or more of maximum laboratory density. The approximate lo~ations of field density tests and :the limits of compacted fill have been recorded on a copy of the grading plan for reference. The' results of field density tests and of relative compaction, expressed as a percent of maximum laboratory density, are given on the attached forms. Laboratory tests to determine moisture-density relationships, maximum, dry density, optimum moisture content, and grain size distribution were performed on representative s(lmples of the material used for fill. The results of laboratory tests are given on the attached forms. The inspections of foundation preparC\tion, types of materials and soil pl~cement and compaction as well as tests of compaction made during the period of our services on the subjec't site were in a.ccordance wjth the. local acceptable standards for this period. The conclusions or optrrions drawn from the tests and site inspections apply only to our work with respect to grading and represent condi~ions at the date of our final inspection. Page' 2 ~glass Pacific SouthWW· ,/roject No. 73-130 /,/APril 23, 1976 We will accept no responsibility for any subsequent changes made to' the site by others or by uncontrolled action of water or by failure of others to properly repair damages caused by uncontrolled action of water. WOODWARD-CLYDE CONSUlTANTS 14129 LJL/JLH/RPW/EHP/we Attachments (5) Page 3 WOODWARD·CLYDE CONSULTANTS ~""""""":\"~"'!" '-;; , . ' '.MPACTION TEST RESULTS • /' / CARLSBAD PALISADES Apr; 1 23, 1976 ~;, NAME DATE REPORTED )B NUMBER 73-130 (Slope Repair -Pad 4) 'TEa COVERED March 10 through March 17, 1976 PAGE 1 OF 1 WOISTURI: P'II:LD U_ORATORY RI:UT'YE DATE "'ST ItETEST LOCATION ELEVATION CONTENT pENa'TY DENSITY CON,.ACT'ON NUNS.:It 01' Ol'TI:ST "" DltYWT. I'CI' I'Cr '/0 OP'U •• DENS. ~CH 10 1 30' FROM W END TOE +2' 9.9 114.6 122.Q 93.9 2 50' FROM WEND +4' B.7 111.3 122.0 91.2 3 30' FROM E END +5' 9.3 112.9 122.0 92.2 ~CH 11 4 lB' FROM E END +7 1 11.7, 117.B 125.5 93:B 5 MIDDLE +10' B.7 112.5 122.0 92.2 6 .20' FROM E END +13' B.7 109.0 122.0 B~.3 7 6 20 1 FROM E END +13' . 6.9 115.3 129.0 90.0 B MIDDLE +15 1 9.9 1.1 1. 3 122.0 . 91.2 :CH 12 9 30' FROM E END +16' 6.4 i l5. 3 129 .. 0 90.0 10 15' FROM E END +lB' 13.0 121. 1 131.5 92'. 1 11 MIDDLE +]9' 12.3 126.4 131. 5 96.1 CH 15 12 30' FROM ~! END +B' 9.3 112.5 122.0 92.2 13 MIDDLE +23 1 . 13.0 112.7 122.0 92.3 14 40 1 FROM WEND +13' 12.3 11B.O 122.0 96.7 15 25' FRO~1 E END +25' 13.6 114.2 122.0 93.6 CH 16 16 MIDDLE +2B' 13.0 112.2 122.0 92.0 ' 17 70' FROM WEND +1B' 11.7 11 1.4 122.0 91. 3 1B 100' FROM WEND +2B I 13.0 11B.4 122.0 97.0 19 60' FROM WEND +23' . 13.0 .110.5 122.0 . 90 •. ,6 :H 17 20 BO' FRor~ WEND +2B' 11. 1 115.6 122.0 94.7 21 50' FROM WEND +25' 11.7 113.0 122.0 92.6 / " • PLASTICITY CHARACTERISTICS , Liquid Limit. % " Plasticity Index. % Classification by Unified Soil' Classification System 150 .......... , -...\ ...... 1 \- 1\ \ 1\ ZERO AIR VOIDS CURVES _\ Ii ''\ 2.80 SG \ 1\ 2.70 SG 1\ , \ 1\ 2.60 SG " 140 r' -r-t"r-=\:=t.t:\----2.50 SG \ 1\ \ \1\ .\1\ \ 130 "1--+-+-1-\+[\-\+-\ \\\...,.,,!\ .... / (,J 0. \1\ \ \\ 1\ ~ \ \ • t-=~4"..""":::'::!!.!.T-----i SI L T & CLAY. 100 (,!) z 80 ~ « 60 0.. I-~ 40 (,) ex: l:e 20 o I I I !. I 'I 1000 100 10 1.0 0.1 GRAIN SiZE, mm ; MECHANICAL ANALYSIS DIRECT SHEAR TEST DATA 0.010;001 Dry Density ,..:...pc.:..:,.f ____ ----JI-_-+-_-J.----I Initial Water Content, % .~~-~r--~--~--~ Final Water Content; % --~--~~-~--~~-4 Apparent Cohesion, psf -~~---~~--~----11---~ Apparent Friction Angle, degrees SWELL TEST DATA Initial Dry Density, pef ~~-~---;-~~------J1---4 Initial Water Content, % ~~~-----+--~~~~--~ Final pry Density, pef ~~-------+--~~--~~~I Final Water Content, % --~-------+----~--~--_4 Load, psf 1-' , Swell, pereen~ ____ --L __ ...J...._--'_.....--,I 'I\r\. r-,.\ Maximum Dry Density, pef 16 122.0 Optimum Moisture 11 0 Content, % • II I DRAWN BY: MOISTURE CONTENT, % 10 20 30 LABORATORY COMPACTION TEST CHECKED BY: FILL SUITABILITY TESTS tARLSBAD PALISADES PROJECT NO: 73-1 30 SAMPLE LOCATION 16 PAD 4 SLOPF FILL' (BORRm PIT) FIGURE NO: WOODWARD·tl YDE CONSUL TA'NTS / 15 0 14 0 13 0 120 110 00 10 . PLASTICITY CHARACTERISTICS· Liquid limit, % Plasticity Index, % Classification by Unified Soil Classification System , \ i\ 1\ \ 1\ ZERO AIR VOIDS CURVES \ 1\ ' \: 2.80 SG \ I\-r-2.70 SG 1\ \ \ 1\ 2.60 SG \ 1\ , \ 2.50 SG .~. 1\ \ \\ ~ '\ K \ f'\' \ 10/11 11\ .\\ 1\ 1/ \ \\' \ ) \ \ 4 j 1\\ 1\\ \ /. !\\ \\ 1\ \ !\ .' \ \ \\ ..-(.) 1\ \ \ i\ 0. 1--\ \ \\ I (!) \ \ t\ LU ~ \ \ 1\\ I- Z 1\ " \ ~ :::> \ 1\ >-I\. a: f\ .\ l\ 0 b----: \\ 1\' 1\ f\.' 1\.\ \ Maximum Dry 10/11 4 Den~ity, !'let 1.11 r.:. 125 Optimum Moisture Content, % 9.0 10. 1 1 J I MOISTURE CONTENT, % 10 20 ,\ ,\ r\ ,\ r\' 1,\ r\. .~ .~ ~~:!::.+--'-!~-r--~ SILT & CLAY 100 (!) z 80 ~ « 60 0- I-m 40 C,) a: ~ 2 o o I. I I I I .1 I 1 000 100 10 1.0 0.1' 0.01 0.00.1 GRAIN SIZE, inm MECHANICAL ANALYSIS DIRECT SH Dry Density, Initial Water EAR TEST DATA pcf . Content, % ~------~---+----4---~ Final Water Content, % Apparent Co hesion, J'lsf Apparent Fri etion Angle, degrees SWELL TES T DATA Initial Dry D erisity, pet Initial Water Content, % Final Dry De nsity, pef. Final Water C ~. ontent, % t-Load, pst Swell, percen 1 and 2 pointers ~\ r\' l\ SAMPLE LOCATION 1\.\ ~" " '\ ."\ ~t\. '\ K: r\ " " 1\..'\ '" ~I 30 40 LABORATORY COMPACTION LABORATORY COMPACT/ON TEST TEST MET~OD: ______ --,- FILL SUITABILITY TESTS CARLSBAD PALISADES AWN BY: . • CHECKED BY, PROJEct NO: 73-1 30 ------~----~~----~----~----~ • • WOODW,ARD·CLYDECONSULTANTS WESTERN REGION 3467 Kurtz Street San Diego California 92110 Phone (714) 224-2911 CONSULTING EN(i!NEERS, GEOLOGISTS AND ENVIRONMENTAL SCIENT March 4, 1976 Proposal No. P7~C06 Project No. 73-130 Dougl ass Southwest Corporation P.O. Box 1114 Carlsbad, California 92008 Attention~ Mr. Leonard Minor AGREEMENT 'FOR SOIL ENGINEERING SERVICES INVESTIGATION AND RECOMMENDATIONS FOR SLOPE STABILIZATlQN CARLSBAD PALISADES CARLSBAD, CALIFORNIA In accordance with your request, Woodward-Clyde Consultants i'S proceeding with additional soil engineering services in connection with the subject project. These services will include: (1) Periodic visual inspections of the slope. (2) The drilling of a test boring to check on th~ groundwater conditions at the back of the slope. (3) Research available information and publications relative to current slope stabilization. (4) Analyzing field conditions and preparing conclusions and'recommendations for slope treatment. . (5) Presenting our findings and conclusions and recommendations in a letter-type report. , A preliminary soil invest~gation and other studies have been performed' for this project by Woodward-Gizienski & Associates under the·ir Project No. 73-130. This data is available to us and will be used, as required, to adequately perform our services. /'~ Ooug 1 as s Southwes t.'oora t ion Proposal No. P76CO , Project No. 73-130 MarCh 4, 1976 •' , .' It is anticipated that our services will incur an overall expense ranging from $1000 to $1100. lnvoi ces for these servi ces wi 11 be sent to Do'uglass Southerwest Corporation at the above address. A charge of 1% per month on the unpaid balance will be made on accounts older than 30 'days from date of invQice. If any action is brought to enforce this agreement, the prevailing party shall be entitled to recover reasonable attorney's fees. The work involved will require the services of various personnel and certain types of tests. Charges for these will be in accordance with pertinent services and tests taken from the attached List of Charges. We appreciate the opportunity of working with you on thi's project.Yo~r signature below will be acknowledgment of our mutual understandi.ng. Please return the original to this office for our records. Very truly yours, LJL/we Attachment Page 2 AGREED TO THIS, ____________ DAY OF_'_' __ '_'_'_'_'_' ._._ .. _._. ' ___ ,1976 FIRM ADDRESS ____ ·_·_· --..' ,_. _. _ .. _.."..-_-,.-__ BY ______________________ ~ ________ ___ WOODWARD-CLYDE CONSULTANTS W,on·nWA· ',An ·CLY:D'E-Cc'O:!',N:SU>:LT-A-","T'-S' .1 lQU· _ '; , ., •. "I.' '; -n CONSULTING ENGINEERS. GEOLOGISTS AND ENVIRONMENTAL SCIENTISTS WESTERN REGION 3467 Kurtz Street San Diego California 92110 Phone (714) 224-2911 June 27, 1975 Project No. 73-130 Douglass Pacific Southwest Corporation Post Office Box 1114 Carlsbad, California 92008 Attention: Mr. Leonard Minor CARLSBAD PALISADES, UNIT NO. 1 CARLSBAD TRACT 73-8 STREET SUBGRADE AND BASE COMPACTION TEST RESULTS CARLSBAD, CALIFORNIA : Attached are the results of field density tests taken at the subject . project at the request and under the direction of Mr. Steve Minor, Project Supervisor-, on the dates indicated and at the locations given.' Also attached are the results of laboratory tests performed on a sample of the materi a 1 used for fi 11. These tests represent the relative compaction and water contents at the locations tested. Opinions as to the relative compaction, wat~r content or suitability of the fill in areas not tested will be expressed by Us 011 ly \"here we have observed thep 1 acement of such fil 1, and have sati s- fied ourselves tha~ construction procedures followed in other areas are represented by the areas tested. WOODWARD-CLYDE CONSULTANTS JLHjRPvJjEHP jen Attachments (5) Douglass Pacific Southwest Corporation '(6) Rick Engineering . // .OMPACTION TEST RESUL. /' /fi NAME CARLS~AD PALISADES UNIT NO • 1 DATE REPORTED 6/27/75 JOB NUMBER 73-130 (STREETS--SUBGRADE & BASE) DATE6C~)vERED JUfle 19 through 23, 1975 DATIE JUNE 19 JUNE 23 TICST HUMP"R SG-10 SG-11 SG-12 SG-13 8-11 , 8-12 8-1-3 8-14 RETEST 01' LOCATION PALISADES DRIVE UNIT 1: OPPOSITE LOT 63 OPPOSITE LOT 88 OPPOSITE' LOT 107 OPPOSITE LOT 115 PALISADES DRIVE: OPPOS ITE LOT 63 OPPOS ITE LOT 83 OPPOSITE LOT 95 OPPOSITE LOT 111 , - PAGE $-1 OF $-1 MOI.TURK YIELD J.AISORATORY REIJ.TlVE ELEVATION COHTENT OF TEST 'flo DRY-WT. DENSITY DENSITY COMPACTION Pc" reI' _ % 01' LAD, DEI"., Subgrade 8.7 120.1 128.5 93.5 II 11. 1 119.7 128.5 93.2 II-11.7 120.6 128.5 93.9 II 9.3 118.2 128.5 92.0 Top of Base 8.1 130.7 130.0 100+ II 8.1 131. 7 130.0 '100+ II 7.5 120.8 -130.0 97.6 II 8.1 128.0 130.0 98.3 150 140 130 120 ·110 100 90 PLASTICITY CHARACTERISTICS Liquid ~imit. % Plasticity .Index. % Crassifj~ation by Unified Soil ClassiliC;;ltion System -- \ \ :\ \ -\ 1\ ZERO AIR VOIDS CURVES \ '\ ' \ 2.80 SG . - 100 ~ 80 ~ ~ 60 I-m 40 (.) a:: ~ 2 o 0 3 ~ Ij. 10 40 I \. -\ \ \ 1\ ~ '-15 '\ r r r 1-1 -1 I , t - ---2.70 SG 1 1\ 000 100 10 1.0 0.1 0.01 0.001 \ 1\ 2.60 SG \ !\ \ 2.50 SG GRAIN $~ZE, mm MECHANICAL ANALYSIS \ .~ \\ ~ \ 1\ \ . \ 1\ DIRECT SHE AR TEST DATA 15 .-, ~ ~~ \ 1\ . Dry Density, ,/ \ ~ \ /' Initial Water \ \ ~ Final Water C '\ i\ \ \ Apparent Co \\ \\ Apparent Frie 1\ \ 1\ pef Content, % ontent, % hesion, psf tion Angle, degte~s -• ..... \ \ .\\ u-\\ \ 1\ 0; 1-' \ 1\ ~\ J: ~ ,\ \' \ -SWELL TES LU T DATA ~ \ 1\ ~\ Initial Dry De I- Z i\\ \ f\. Initial Water ;:) \ \ ~\ Final Dry Den >- nsity. pet C(;mtent, % sity, pef a:: \ f\\ 1\ Final Water C Q , ontent, % \\ \' Load, pst 1\ \ ,\ ,. \. Swell, percent \\ ,\ 1\ \ \ \.\ -\. \. 1\\ "-t\\ l\ SAMPLE LOCATION Maximum Dry 15 \['\\ l"'~ Density. pcf 130.0 '\ ~'\ ~t\. 15 Oppos He Lot 25 Optimum Moisture 8.5 \ '''\. r\ Contont,% .'\ " '" MOISTURE CONTENT. % 1"'-~l 10 20 30 40 LABORATORY COMPACTION LABORATORY COMPACTION TEST TEST METHOD: ASTM-O 1557-70 A FILL SUITABILITY TESTS CARLSBAD PALISADES ORAWNBV: A.s.1 CHECKEDIlV:# I PROJECT No:. 7J-130 I DATE: 5/16;75 I FIGURE NO: 1 WOODWARD·CLYDE Cor~SUl TAN'fS 3467 KURTZ STR~ET SAN DIEGO CALIFORNIA 92110 (71,., 224-~11 • April 22, 1975 Project No. 73-130 Douglass Pacific Southwest Corporation Post Office Box 1114 . Carlsbad, California 92008 , . Attention: Mr. Leonard Minor INTERIM 'REPORT OF ENGINEERING OBSERVATION AND COMPACTION TESTING CARLSBAD PALISADES UNIT NO. 1 OFFSITE FILLS (FUTURE U~IT NO.2) CARLSBAD, CALIFORNIA '.' , . In accordance with your request and our proposal dated July 29, 1974, we have provided soil engineering services in conjunction with the placing of offsite fills at the subject site. These services included: (1) Engineering observation of the grading operation. (2) Taking field density tests in the fill placed and compacted. (3) Perfonning laboratory tests on representative samples of the mat~rial used fGr fill. Site preparation, compaction and testing were done between November 21, 1974 and February 25, 1975 ;'n accordance with the "Specifications for Controlled Fillil in our t'eport entitled "Soi1 Investigation for the Proposed Agua Hedionda 63 Acre Site, Carlsbad, California", dated Marcb 3,1973. Fill was placed, compacted and tested in the.fo1lowing areas during the grading of Carlsbad Palisades Unit No.1: ' (1) A cut slope located south and adjacent to Tamara,ck Avenue in future Uni t No.2 was excavated and rebuilt with compacted fill to buttress the slope in accordance with Section B-B of the approved plans. Minor ad- ditional fill was plac'ed above the buttress to accomodate a water line. This latter fill was placed in an area designated as an extension of Neblina Drive and a future street. (2) (3) '.' • Fill wasplacee, compacted and tested east 'of the temporary accessro~d, and north of Bui.lding Pads 115 through 119 and Pad 10'6. ' Fill was placed, compacted and tested in an area southwest of Palisades Drive. approximately 300 feet north of its intersection with Tamarack Avenue. This was a daylight fill placed to provide drainage. Oompaction procedures were observed. and field density tests were made to determine the relative compaction of the fill in place. Field observations and field density test results indicate that the fill has been compacted to 90% or more of maximum laboratory density. The approximate locations of field density tests and the limits of compacted fill have been recorded on a, ' capy of the grading plan for reference'. The results of field density tests a'nd of relative compaction. express'ed as a percent of maximum laboratory d,ensfty., ~re given on the attached forms. ' Laboratory tests to 'det~nni ne lTlGisture-densi ~y relationships, maximum dry dens'lty, optimum moisture content. grai n size distribution t plasti city char-. acter; sti cs, and strength, and swell cnaracteris t1 cs were petfonned on repre- sentative sampl es of the material used for fill. The results of 1 aboratory tests are given on the attached forms. It is our understanding that add;tiona.lgrading will be done in these areas at a later date. Foundation recommendations will be made in our final report at the completion of grading. The elevations of compaction tests shown as finished grade (FG), tests corres- ~ond to the elevations shown on the grading plans for "Carlsbad Tract 73-8 (Carlsbad Palisades Unit NG. 1)", Sheet 6 of 6 in prints dated September 19,' , 1974, prepared by Rick Engineering Company, San Diego, California. Elevations and locations shown in this report are based on field surveys established by others. ' This report covers the fill placed under our observation during the ·d~tes specified herein. Additional fill placed after these dates should be compacted under thecIDs'ervatial1 of this office and tested to assure compliance with the earthwork specifications for the project. This office should be contacted at' least 24 hours prior to start of grading operations. The inspections of foundation preparat;'Gn, types of materials and soil place- ment and compaction as well as tests ·of compaction made during the period of our serVices on the subject site were in accordance with the local acceptable standards for this period. The conchlsions or opinions drawn from the tests' and site ins'pections apply only to Gt:ir work with respect 'to grading and repre- sent conditions at the date of our ffnal inspection. ... Page 3 We will aeeept no responsibility for any subsequent changes made to the site by others or by uncontrolled action of water or by failure of others ttl. prop.erl,y repair damages caused by uncontrolled action of water. WOOm4ARD-CL YDE CONSULTANTS l~l/JLH/EHP/en Attachments (4) D~uglass.Paci:ic Southwest Corporation. (1 ) R, ck Engmeerl ng Company , .. '$ '~':~"~f~·'''f·-f?:~ /'- ~/' .. .OMPACTION TEST RESUL. Ja. NAflilll CARLSBAD PALISADES UNIT #1 (FUTURE UNIT #2) • DATI: R£,.o"nc 4/22/75 ." J~ NUMal:R 7~-130 (STREETS) DATUCOVl:I'lItD February 20 through February 25, 1975 PAGE S-1 0,. S-1 MOItn'UItE !"IItLO "'.OItATORY ItELATIYC DATil TIIaT ItIiTEaT NUM.Iit'! OF ,"OCATION ELEYATION COHTIINT OIlHalTY 'OIlN,arTT CO .. ,.Ac:TIOH 01" TEaT '110 OilY WT. PCI', PC, .. OF t.A8. PEN .. OFFSITE STREET FILLI UNIT #2 FROM eTR LINE OF.tAMARACK AVE: FEB. 20 S-l STATION 11+63, 186 1 S 202 1 11.7 119.6 i 27.0· 94.1 $-2 11+90, 186 1 S 204 1 12.3, 118.2 127.0 9,3.0 5-3 12+40, 2241 $ 206' 9.9 118.9 125.5 94.7 - 5-4 12+25, 197 1 S 208 1 11.1 117 .6 128;5 91.5 5-5 ' 10+85 t 197 1 S 210' 13.6 112.3 121.5 92.4 FEB. 21 5-6 STATION 12+25, 236 1 S 212' 12.3 114.0 121.5 93.8- 5-7 11+62, 212'$ 2141 13.0 112.7 121 .S 92.7 5-8 12+36, 270' 5 216' , 11.1 119.4 128.5 92.9 5-9 1(1)+87, 226 1 S 218 1' 10.5 118.5 12,8.5 92.2 5-10 11+75 f 254' S 220' 11.1 117 .6 128.5 9-1'.5' 5-11 12+20, 266' 5 2241 10.5 111.3 128~,5 91..2 5-12 12+27, 314' S 5G 2,26' '12.3' ll9'.2 128'.5 92.7 £!B .. 24 5-13 STATION 10+39, 220' 5 5G 220' 11.1 11,8.6 l28.5 92.2' ~ . .,' 'W,OODWAlO • GlZIENSK'1 & A'S:S:O:CI'Al'ES COHSUUING ~Oll. ANO rOUNOATION (NGINEfAS AM/l' GCOL~"TS /' .OMPACTIOK TEST RESUL. ~~ I)"T.RI:PoMT~ 4/22/15 ' /;loti N"MIl CARLSBAD PALiSADES UNIT 1 Jotl NUMall:1!I 73-130 . ' '(VJESTERL Y OF;FSITE FILL) D"~. COVERED November 1 through December 2, 1974 "AGI: wO-1 0.. Ji/ti-1 -MOIIlTUJia I'II:I,D u.So\iAi'QIU ~"ft !to\\'II 'laT ~T LOCATION EL&VATIOH CONicHT OllNiI'''''' Hie.,n CQ1.""CTIQtf "~~!lIt" 0, Ol'TC.T 'lit ~Y'iWT. l"C' ~ ~;)Y~'.~t,I!i .. FROM TH~ CENTERLINE OF EL CAMINO REAL: NOV .. 1 1 STA 504+47, S. 135' 114' 9.9 116.3 '125.5 92.6 NOV. 19 2 STA,S04+00, S 108' 116 1 11.7 118.0 118.0 9@.8 NOV._f2. 3 STA 504+73, S. 173' HS" 12.3 105.3 111.(;) 9ll);.0' ~ NOV. 22 4 STA '5'04+20, S. 185' 120' 13.6 112:.9, 117.0 9'6'.4 , . NOV. 25 5 STA 5'!15+30, S. 14B' 124' 12.3 108.3' 120.0 90,.2 NOV. 26 6 STA 505+6'5, S. 88' 128 1 11.7 113.1 119.0 95.5 O£c. 2 7 STA 505+44·, S. 219' 132' 9.3 109.5 121 .. 5 90:.1- DEC. 13 8 STA 5G6+53', S. 148 1 136' n.7 110.3 118.0 93'.4, DEC. 19 9 STA. 506+17, S. 240' 138' 14.3 110.1 1l5~5 95.8 10 STA. 504+78, S. 115' 138' 13~6 108.2 115.5 93.6 DEC • 20 11 STA. 5Q4+64, 54 255' 140' 11.7 107.9 118.0 91.4 • ~_m. 12· STA. 505+84, S. 162' 142' . 11.7 112.0 118.0 94'.9' JAN. 15 13 STA. 506+90, S. 242' 144' 13.6 104.1 115.5 9(1).1 14 STA. 506+12, s. 103' 146' 12.3 105.6 115.5 91.4 JAN,. 16 15 STA. 505+20, S. 165' 148' 12.3 113.2 118.,5 95.5 16 . STA. 506+26, S • 152' FG 150' 11.7 108.3 118.'S 91.3 JAN. 17 17 STA. 506+13, S. 285' 152 1 12.3 n2.5 121.5 92.5 .... -18 STA. 504+50, S. 295' 154' . 10.5 110.2 118.5 92.9 JAN. 20 19 STA. 504+26, S. 160 1 156' n.1 109.9 118.5 92.1 '20 STA. 504+75, S. 375' 156' 11.1 108.3 118.5 91.3 gAN. 21 21 STA. 505+62, S. 320' 156 1 13.0 108.9 118.5 '91.9 JAN. 23 22 STA. 505+00, S. 21'5 1 158' 12.3 109.9 118.5 92.7 ..- JAN. 24 23 STA. 50'5+05, S. 303' 158 1 12.,3 111.4 121.5 91.6 24 STA. 405+30, S. 100' 160' . 13.0 114.2 121~5 93.9 2S STA. 504+70~ S. 320' 160 ' 11.7 111.8 121.5 92.0 26 STA. 504+60, S. 39Q 1 162' 12.3 113.5 12.1. 5 93.4 WOODWARD· GIZIENSKI & ASSQCIATES COlI_liNG S1)1i. AND rOUHO'"TION 1"&'"'lllS AND ClECl.OG.ITS ~ 'i'·"",.""J"~~7,-,t~"'f :\1~0.i;l~r~ .. " ..... , ... / ~COM·PACTION TEST RESU.~' //' ~.c ~;- /" .CARLSBAD PALISADES UNIT #1 Joe NAMIl DATI: RI:POltTED 4/22/75 • J~ NUM.tlt 73-130 (FUTURE UNIT '2 OFFSITE FIll) DAn. COYEltED January 8 through F~bruary 19, 1975 "AGE 2 ... 1 0"2-1 Moui",". 1'11lU) LA.OItATORY ItItLATiVI DATIl 'TIIlIT RlTI[IT -L.OCATIOH IlI.IVATIOH cOIiCUNT D&NIITT DItNIITY colli "ACTION "UN.1l1t 01' OI'T&ST , DIIYWT. PCI' PCI' "" OI'~.DIDCL FROM CENTER LINE OF TAMARACK AVE: JAN. 8 1 STATION 8+86, SOUTH 100' 153 1 13.6 115.2 118.5 97.2 2 9+15, SOUTH 75' , 155' 13.0 114.1 118.5 96.2 3 9+00, SOUTH 120' 157' 13.6 114.8 119.0 . 96.4 4 9+38, SOUTH 65' 159' 13.6 113.2 119.0 95. 1 , JAN; ~ 5 STATION 8+90, SOUTH 84' 161' 13.0 112.8 119.0 94.7 FES. 7 6 STATION 9+26, SOUTH 86' 163' 11.7 109.3 119.0 91.8 . 7 10+05, SOUTH 49 I 165' 12.3 110.6 119.0 92.9 8 9+03, SOUTH 98' 167' 8.7 116.2 127.0 91.4 FES. 11 9 STATION 9+63, SOUTH 46' 169' 10.5 118.5 127.0 93.3' 10 10+40, SOUTH 60' 171' 10.5 118.8 128.5 92 •. 4 11 9+ 11, SOUTH 110 I 113' 11.1 117.3 127.0 9'2.,3 12 11+16, SOUTH 46' 175' 9.9 116.8 127.0 91.,9 fEa. 12 13 STATION 9+61, SOUTH 78' 177' 12.3 119.7 128.5 93.1 14 10+62, SOUTH 76 1 179' 11.1 118.2 128.5 91 •. 9 15 9+43, SOUTH 108' 181' 9.9 117.7 128.5 91.5 16 11+89, SOUTH 46' 183' 9.9 120.5 128.5 93..1 17 10+17, SOUTH 84 1 185' 10.5 . 119.,6 128.5 93.0 FEB. 13 18 STATION 12+40, SOUTH 74' 186' 14.3 115.9 118.0 98.2 .19 9+~2, SOUTH 141' 187' 12.3 119.9 128.5 93.~ 20 11+90, SOUTH 87' 188 1 13.6 109.3 118.0 92.6 21 11+02, SOUTH '102' 190' 11.7 117.3 127.5 92.0 22 9+60, SOUTH 119' 192 1 10.5 117.8 127.5 92.3 FEB. 14 23 STATION )1+90, SOUTH 106' 194 1 11.7 119.2 127.5 93.4 24 10+68, SOUTH 119' 196' 11.1 118.5 127.5 92.9 25 9+62, SOUTH 153' 198' 11.1 117.5 127.5 92.1 26 11+40, SOUTH 15·2' 200 1 n.7 118.7 128.5 92.3 FEB. 18 27 STATION 10+18, SOUTH 120' 202 1 13.6 114.3 121.5 94.0 28 £H82, SOUTH 170' . 204' 13.6 113.2 121.5 93.1 29 9+40, SOUTH 133' 206' 12.3 118.3 128.5 92.0 30 10+13, SOUTH 139' 208 1 10.5 117.5 J 27.0 92.5 FEB. 19 31 STATION 10+32, SOUTH 183' 210" 11.1 116.3 127.0 91.5 32 10+30, SOUTH 166' 2121 13.6 111.9 121.5 92.0 33 9+84, SOUiH 194' 214' 10.5 118.8 127.0 93.5 34 10+36, So.UTH 172' 216' 12.3 117.5 128.5 91.4 35 9+93, SOU"TH 187' 218' 10.5 117.7 127.0 92.6 36 10+21, SOUTH 201' 220' 9.9 116.5 127.0 91. 7 WOODW-ARD • GIZIENSKI & ASSOCIATES CONSulTING ~OIL ""0 rOUND" liON ("GIN-tiltS "",0 GfOL,OCII\l" . ·~'IJI}~~ -_._-----. - / / .OMPACTION TESTRESUL.· .Joe NAMa CARLSPADPALISADES UNIT 1 DATI[.R£I'OATII:D 4/2//75 .lOll NUN.EIl 73-130 (SOUTHERLY OFF~SITE FILL) DATEI!I COV~"ED December 2, 1974 through January 28, 1975 ftAGESO-l 0,. 50-1 IIOI.TUIIII .'ItLO LA.ORATORY IIItU,.'VIl ~TI: """T III1TII.T L.OCATIOH I:LICVATIOH CONTIeNT ·DII:'NIIITY DiM.ITY 'COM-PACTION ·NU ... 1:1t 01' 01"'1'&.'1' ... DIIYwT. 1'<:1" PCI' % 01" &.All. OlEN" FROM tHE CTR LINE OF PALISADES DR: . DEC. 2 1 STATION 4+36, SOUTH 29' 132' 13 •. 0 108.9 118.0 92_.2 DEC. 13 2 STATION 4+70, SOUTH 34' 136' 12.3 118.2 127.0 93.0 DEC. 23 3 STATION 3+75, SOUTH 50' 140'-11. 1 116.8 127.0 91.9 JAN. 17 4 STATION 5+26, SOUTH 40' 142' 11.7 112.3 -121. 5 -92.4 JAN. 27 5 STATION 4+20, SOUTH 55 1 144' 12.3 1-10.3 121.5 90.7 6 STATION 3+30, SOUTH 35' 146' 11.7 111. 7 121.5 ·91.9 .JAN. 28 7 STATION 5+70, SOUTH 55' 148 1 12.3 109.6 121.5 90.2 8 STATION 4+82, SOUTH 66'FG 150' 13.0 113.0 12.1. 5 93.0 ,-- WOODWARD· GIZIENSIO & ASSOCIATES CONSULTII<G "OIL AI<o FOUI<DATIOl< 'I<GII<UII' ANO QlOLOCISTS (' .! : : .: ~'=" I, ;_Ql . : . '. 'PUSl'lCrW 'CHARACtER.! Silts: ~ :r _____ " ~.'''~ __ '-~ .... __ ,_~'-.~~"~~ _. . . ... ,. ~ I '. ~ ;: ti·4ui:d :ljmit~ ~ . , ~~ . . , i; • 1 ;,~ip'.l~~t-i~.i:t;:lna~x.l~ ", , : tCranifiCdi.Qii 'by: ,Qftif,i~lf$on :: iC1Jl:siHcatiCHl·Sy,s,1.e.i l' ---~ .--"-• ,-~~ -, I 1"2 3> : . ~ ",-,. .". ( . ", , ~~'~;:_j6'_,::2~'~~_:! sc , ! 'I f,>'~_,W~'_'-'_ ~, ~_'A' rg-::-,-.>ar7··'-_-''i ·~~·.:""-."-f~(t~.j.fi1-~.-i& ~.~."~-, , " ~ I ::-~,_~, --_~ _~. : • ___ , '0-_, __ , ! " :; i \ ---- , i. :90: 'Q"XID :D:RV " 'OEMll TV. 'pc1, ., I , . :; , l" I; ( : . ,l ,i , ' ,I , , ',. ,", ~ 'oprj'I'IJM~M'O 'GlURE ; :CO!lTEM)' •. ~ i : . ; ~'.' t' - ",0 ZO 30; itW ., .. ' ;IJaRltOtf ;OtWACTJ~' tt:S;.:.-T~ .......... _____ ioiiiloooioo"""""~_~_ ..... ,' ~,,~~_' .. " ..... 'iI!io!i-'iiooIiJI' --__ flll.'SUltABILll'f tEsts: tAtdlSg~DPAL:t.SAr;)'~S, urU!' NO.l " i '" ----". --~ ~-~,,' ,-"'---" '~--,', ---, ~. ' I -, .. -,. i' DlREC1·SHtAR TEST DATA "' Dry Oeo~ity, pcf , , tnltia. w._ter Content. ~ ~ Final Water Cont~nt, ~' Apparel'll Cohesion. p&f ~pparent Friction ,Angle. \) " ,~W'ZERO AIR VOIDS CUR'YES I--+-~~~," '~'\ .\ " \,~2.70 S.G. , 130 ~-4--+-~, 4\~[\/ 2.60 S. G. .. 1\ , ..... 2.50 $.6,. !\ l\....-~ '.\1\ 1\ \ o ' I. I I I . ,I I :I I 1000 '100 10 1.0 0,1 0.01 0.001' GRAIN SIZE 1M Mllll~ETERS PLASTI C f 1Y CHARACTERISTICS liquid limit. ~ PI alt i ci t y I "Clex • ". Classification bYlIni,fied Soil Classification Systea SWELL TEST DATA Initial Or~ Density. pet Initial Water Content. ~ load.' psf Percent Swell " , '" 4 33 15 SC 4 - -- - ;' 5 " 6:," 34 32 : , 11 SC sc 5 6 ,)05.7 ... 12.1 - 160 '. -" .' 3. 9 - , " SAMPLE LOCATION \. ~ '\. 4 'Pad 15 . ~~~~~~+-~~~~I'~I.~,',~ ~ ~~~~~ ____ ~ ________ ~ 4 5 6 t\ S Pad 53, lot 2 90 ~AX I fi«JM DRY OEMSI TY. pc,f 'OPTIMUM·MOISTURE COtHEltT. ~ LA~ORATORY CQMPACrtON 121. 0 118..0 117. o"~~ ~6 -+-.i-pa.;.;,.;d;;....2;;;..;;2~...;...;...~------i ~ ,'~~'~~~~~~--____ ~ ____ ~-J "1. 5 12.0 12. 5 \.. \.. t\. TIST Io4E11tOO: ASn1-D1557-70}.' , FU.l SUITABILIlY rESTS, tARlSBAD PALISADES UNIT NO.1 Z I ENSKI & ASSOt I ATts "",..,. -----,-, > --. • • MlECHAH I CAL ANAL YSI S ." 3 a q 10 '10 200 100 -~ DIRECT. SHEAR TEST DATA 1 80 Dry Density,. pet (.!) "., x " . -. .Initial Water COntent. 10 c;; . i\\ \.. ~7 !:1 60 " 9..:;,' M\ C1. Final Water Content. % I-\\ "'-ffilW Apparent Cohesion. psf ..., ~"' t-..... .-0::.-.. UJ ~ ,.~ Apparent Friction Angle. c A.. 20 ..... " . lj I. 0 I I f I , , , I 1140 1000 100 10 1.0 0.1 0.01 0.001 \ 1\ ~ZERO AIR VOIDS CU~VES GRAIH srZE 1M MILLIMETERS \ \-IC~B8LE~IG~ArE~ lei S:MEi]SILt & CLAY] V' \ , -\ \ .. \ V2.7G 5.G. , 130 \ PLAST' C 11Y CHARACTER I:ST ICS \~2.60 S.G. 7 8 9 i\ ~~V2.50 ~.G. Liquid limi t, % 34 -36. 1 '\ ~\ Plasticity Index. r. 15 -20 1/ 1\ \\ 'Classification by Unified Soil 1: R'\\ 120 .g--. Class; fication System CL SC SC ! ,/ 1\' ~'" :R ~ 7" "\ I~\I\ . .... r ..~ v V a. 7 :::;;: 7 -\ I~'~ ..... -; SWELL iEST DATA 9 9A 'ffi r-..' ,\ ! 10 L::j )r. '\ ~ t\ Initial Dry Density, pef 116.1: 115.0 l-.. - % 1\ \ Initial Water Content. ~ ll.4 13.6' '-:::> " >-\ \ f\ Load. pst" 160 ,160 , 0: Q f\ 1\\ -- \ \ i\ Percent Swell 3.2 0.8 1,00 \ f\ :\. " - \\ i\ SAMPLE LOCATION \ ~~ 7 Section A ... A, Stat-i-on 488+5"0 90 HAXIMUM DRY 7 8 9 i\ 8 Pad 1 ~ DENSI TY. pet 115.5 121. 5 127.0 ~~. 9' Tamarack Ave. Station 2+00 OPTIMUM MOISTURE 'f\! Co!(TENT. '/. 15.0 13.0 11.0 I\. I\. r-.. ~ ~\.. 80 0 MOISTURE CONTENT, 7-~~) 10 20 30 40 lABORATORY COMPACTI~~ TEST Fill SUITABILITY TESTS LABORATORY COMPACTION . CARLSBAD PALISADES TEST MEl1fOD: ASTM-D 70 A -UNIT ,NO. 1 WOODWARD -G I Z I ENSI< I & ASSOC I ATE.S COHSULTiNG SOIL AND FOUNDATION ENGII~'EERS AND GEOLOGISTS . SAN 01 ~GO. CALI FORN I A . . OR. BY: GS , SCALE: ---. PROJ.HO: 73-130 , ' CK'D BY: i~~,tl1) DATE: 12/13/74 PAGE :l nf Ii ~ ------.--- ~ .. " . .....:.-....... -",~ ... ~...... . " --• IRa _ • ....... 4 : t.ECHA.~ I CAl AMAL YS I S 100 ~ __ ~3~~a~~_'~O~.~~~~~r-~~~ I\~ 1\. DIRECT SHEA~ TEST DATA 10 11 12 Dry Qensity, pet -107.7 106.5 80 . C!J x \\\. \ \ . Initial Water Content. ~ -13.1 13.0 Ci) ~ 60 \ kf-12 final Water Content. ~ 16.2 18.0 a.:. -~ Apparent Cohesion. psf 240 420 ffi IlO . -u a:. \~ w Apparent Friction Angle. o· 28 25 0..20 \ .:--.... ·lD - o J I I J I I I i f-_';::: 1'10 .--,.......,.~_ \ I\.WZERO AIR YOIDS CURVES 1000100 10 l.·Q O. I 0.01 0.001 ~\ IG~~ ~ ~ \ 120 ....-+-t-:H--/+=1~\~4-,~tJ\t\ II ~~ ~~~ .... 1 V :/\'~f\ ~~~~~/.~~~~~~~ ~~,_~~~7'+-~-4~\F~~~~ II 0 '!i1I--i-+-+-+-+-+---fl~ '.r-"'n-~-\ ~ t-+--t--t-t--+-+-+.-->f--l \' \'tf4.t\ ~~~~~-+-+-+~~~~~ )to . \ \r\ ~~~~~-+-+-+-+-rK~~\ " ,\1\ 160 J-+-+--+-4-~-+---1--+-+-~~-l\-\, GRAIN SIZE ttl NILLHIETERS , " PLASTICITY CHARACTERISTICS 10 11 12 Liquid Limi t, ~ 28 --. Plasticity Index. ~ 11 NP NP Class(fication by Unified Soil 'CI ass; t i cati on System SC SM SM SWELL TEST DATA 10 11 12 Initial Dry Densit,. pci 115.2 -- I n.j t i at Water COI'I t~t~ ~ 9.1 -- load.,. pst 160 -- Percen t Swe II ·1.3' -- .,. , '\ :SAMPLE LOCATION , '\ r\. I----r-"'-. ------"'-----,..,------4 I--II-f-+-+-+-+-t--t---+---+--+--+--fo.\~~~~ lOT amarcack Station 14 . 90 ~AXI~lM DRY 1--J.1~04-.;..11=--~1..::.2--+1\~ 11 Lot s:1~ - ~D_~_S_'n_._p_et~. ____ ~.~1~Z7.~.~0~1~2~0~.O~11~8~.~51~~~t~12~'~Lo~t~9®~ __________ ~ ____ ~ OPTIMUM MOISTURE 1'1, COOT EHT. ~ 9 • 5 12 . 5 13 . 0 f\. ~ " .. ~ f\..~ MO I STURE CONTENT ~ "~ ~ I 80~O~~~~I~O--~~~~2~O~~~--~~~~~~~ I il I f . ! i i I -I I • LABORATORY C()PACTION TES-;.;.T __ """"-______________ --; FI LlUSU I TABllI TV TESTS. I' CAmtSBAD PALISADES !UNIT NO. 1 J-------........ ..;..;...-------------·~I WOOIl-JARD -em Z I ENSI( I & ASSOC I ATES$! COHSULTING SOIL AI1DF.mlJtIDATI~ E/<lGINEERS AND GEOLOGISTS !I . • SArti 101 El:(), CALlf-Ql\IiIA ,,~ J-------..-...r-.;..;,.-~;..;.;......;.....;..;....;;....;.;.;....,...--~~ ...... -··i DR. DY: GS SCMflE:-- -PROJ. ~o:73-1~O !:: CK'O BY: !ZfJu/ DAnE: 12/13/74 PAnE 4 OT 4 ,.1 ... ........ {."'---:' ==--e ~ .• ;~j LABORATORY COMPACTION TEST MffiiOO: ASTM-D 1557-70 A 1110 130 120 110 100 90 tECHANICAL ANALYSIS DIRECT.. SHEAR TEST DATA 13 . 14 100 3 l IJ 10 110 200 1:\ ~ " Dry Density, pcf '. 113.8 115.5 14 \ \ 1"3 Initial Water Content. %. 10. 1 11.5 .. \ \ --.- - Final Water Content. r. 14.4 13. 1 \ \: \ \ Apparent Cohesion. pst. 210 330 , Apparent Friction Angle. 0 29 33 \ f\ ~ZERO AIR VOIDS CURVES , \- ~ \ 1\ \ \ -\ V2.70 S.G. \~2.60 S.G. -1-13 i{'W 2.50 S.G. "-y I ~ \\ I <II' r\ l\\\ \ \ 1\ f--'-'4. , \ .... \ \r\ v r\\ \ Q. ~ \ 1\ r\ ::z:: '\ . c.:::I .~ \ 1\ 1\ ~ -:z 1\ :::I >-\ \ r\ 0:: Q J, 1\' '\ r\ \. \ 1\ \ -\ \ \ '.' 1\ MAXIMtJt.t DRY 13 14 DENSITY. p'cf 127.5 128.5 QPTIMUM-MOISTURE 10.0 11"0 CONTENT . .,. MOISTURE CONTENT % -10 20 LABORATORY C()PACTI~ LABORATORY COMPACTION TEST METHOD: ASU1-0 1557-7~A -\' , o L I 1 I I I_ I I r--=:::: 1000 100 10 J 0 0 I 0 01 0 001 . . . GRAIN SIZE IN MILLIMETERS ~OBBLESIGRAVEL I ~AH~ . cl f c I m_ , ISILT& CLAY ] , PLASTICITY CHARACTERISTICS 13 14 Liquid LimH, r. -. 29 Plasticity Inaex. r. NP 9 Classification by Unified Soil Classification System SM SM-SC SWELL TEST DATA 13 14 Initial Dry Density, pcf .. 115 .. 6 Initial Water Content. % -11.4 - Load. psf ... 1---. 160 Percen t Swe 11 -0.1 1\ SAMPLE LOCATION i\\. 13 Borrow Area Upper Tamg,Ta.ck 30 \ ~~~ \. " !\.. 14 Borrow Area Upper Tamarack r-... ~~ ~,,~ Fill SUITABILITY TESTS CARLSBAD PALISADES UNIT 1 WOODWARD -GIZ!8~SKI & ASSOCIATES CONSULTING SOIL AND FOUNDATION ENG HEERS AND GEOLOGISTS SAN DIEGO, CALI , A I • 3467 KURTZ STREET SAN DIEGO CALIFORNIA 921 10 (714) 224·2911 April 15, 1975 Project No. 73-130 Douglass Pacific Southwest Corporation P.O. Box 1114 Car1sbaq, California 92008 Attention: Mr. LeQnard Minor FINAL' REPORT OF ENGINEERING OBSERVATION AND COMPACTION TESTING CARLSBAD PALISADES UNIT 1 CARLSBAD TRACT 73-8 BUI LDI NG pADS 33' THROUGH 6i, 63 THROUGH 9:l 95 THROUGH 119, AND COMMON AREA LOTS 32, 62, 94 AND 120 CARLSBAD, CALIFORNIA • In accordance with your request and our proposal dated July 29, 1974, we have provided soil engineering services. in conjunction with the grading 6f the subject site. These services included: (1) Engineering observation of the grading operation .. (2) Observation of the removal of loose surface and alluvial soil prior to placing fill. (3) Observation of the removal of potentially highly expans'ive soil from the finish grade pad areas and replacing it with nonexpansive soil. - (4) Performing periodic geological inspecti-ons of the cut .slope areas.! (5) Observati~n of the special preparation ·of foundation areas offill slopes over 50 feet in height. (6)· Observation of the construction of buttress fills in cut slopes Where required.' . (7) Taking field density tests in the fill placed and compacted. .'- .- • (8) 'Performing laboratory tests on representative samples oT the material used for fill. Page 2 Site preparation, compacti.on and test;-ng were done between October 25, 1974 and February 25, "975 in accordance with the "Specifications for Controlled Fillil in the Woodward-Gizienski & Associates report entitled "Soil Investigation for the Proposed Rancho Agua Hedionda-63 Acre Site, Carlsbad, California,!! dated March 3, 1973~ and addendum reports dated May 16, 1973 and Octobet 1, 1973 (revised October 26, 1973} and letter of August 22, 1974. GENERAL GRADING AND COMPACTION CONTROL PROCEDURES Fill was placed, compacted and tested on all the subJect .pads covered in ·this report, that is Pads 32 through 12.0. Preliminary site preparation included removing loose or porous surface soils, where encountered, and special preparation of the foundation for the fill slope at the rear of Pads 67 through 77 and .-:: 99 through 106 which was done in accordance with our recommendations and is similar to Section IIA-A'I of the approved grading. plans. In addition, the toes of two slopes, the large cut at the southwest corner of the site, and' the toe of the cut-fill slope at the rear of Pads 38 through 45, were excavated and buttressed with compacted fi II in accordance wi th recomme·ndati cns and Settfon. IIB_8 i1 of the grading plans. As the site grading progressed, the compaction procedures were obse,rved, and field density tests were mdae to determine the relative compaction of .the fill in place. Field observations and field density test results indicate tha t the fill ha s been compacted to 90% or' more of max.inium 1 abora tory dens ity. The approximate locations of field density tests and the limits of compacted fill have been recorded on a copy of the grading pl~n for reference. The results of field density tests and of relative compaction, expressed asa percent of maximum laboratory density, are g·iven on the attached forms. Laboratory tests to determine moisture-density relationships, maximum· dry density, optimum moisture content, gratn size distribution, plasticity.character- istics, and strength and swell characteristics were performed on representative samples of the material used for filT. The results of laboratory tests are given on the attached forms. - FINISH GRADE PREPARATION During the grading operation certain pads were specially treated tfr provide a specified depth of selected soil at rough grade. laboratory tests and visual inspection lndtcate that nonexpansive fill was placed withi n 3 feet of rough grade on a 11 bu i 1 ding pad areas noted here; n, and within 2 feet of rough grade in other areas including the remainder of the level portions of the lots, and common and parking areas. I' I . glass Pacific souti.~.st Corporation ';'Project No. 73-130 Apr; 1 1~. 1975 • The cut portions of Pad$ 1 ,21, 22, 30, 31' and 33 to 61 were undercu-t to remove potentially expansive soil. The, expansive soil was replaced with nonexpans;:ve fill to a depth of 3 feet below Tough pad graqe with Hl the ,proposed bu i1 ding pad area. Other level lots were' undercut and replaced tQ a depth of -.. 2 feet., " Rough lot grade is defined as that grade set in the field by the graqe chec~er from reference .st~;kesestab 1 i shed by the surveyor and repres'ents rough grade, Page 3 at the time we were inspecting the removal and replacement of expansiveso'ils,. likewise the depths of undercutt; ng of expans iV,eso; land/or depths bfplacement of nonexpans i ve soil were in accordance wi-th measurements made by and grades ' set by the contractor'! s grade checker. FOUNDATION REOOMMENDATIONS (AI,.L LOTS) (1)' Foundations for single or two-story multi--dwelling structures placed,' on nonexpans ive properly compacted filT may be designed for a 'oeari'ng pressure ( of :2,500 psf (dead plus live leads) at a depth of 12 inches below COnip'acted ' fill lot grade. , Footings should have a minimum width of 12 inches. These pressures may be 1,ncreased. by one-third for loads that jncl ude wind' -or sei smic forces. . (2) Structures that will not tol erate different; q 1 settl ements (such as, foun,dations, . swirnining pools~concrete decks, walls, etc.) should not be located within' , 5 feet· of the top of a slope. Footings located closer than 5 feet from the top. of a slope s:hou 1 d ,be extended in depth unt i 1 t-he outer bottom ~d.ge of the footing is 5 feet horizontally from the outsi-de face of the slope. (3) It should be anticipated that structures, s'uch as swimming pools, that . extend below a depth of 2 feet may be founded in potenti~11y expansive 'soils and may require speCial treatment or design.' . LIMHATIONS The elevations of compactton tests shown as finished grade (FG) tests correspond to the elevations ShOWh on, the grading plans for "Carlsbad Tract 73-8, Carlsbad .. Palisades UnH No. ,", printdated Septel1'lber 19,1974, prepared by Ri-c~ El)gineeri,ng Compa,ny, Sa'n Diego, California. Elevations and locations shown tn this report are based on field surveys esta'blished by.others. This repott covers the fill placed under our observation dUring the dates specified herein. Additional fill placed a'fter these dates, as well as the backfill . i,n utility trenches located within 5 feet ofa building and greater than 12 inches deep, or any trench 5 fe'et or more from a bLi il di ng .and in excess of 5 feet in depth, shoul dbe cornpa.cted under the observati.on of thi-s office ,and tested to assure, compliance with the earthwork specifications for the project. , Th,is office should be contacted at least '24 hours prior to backfilling operations . . Utility servi-ce trenches within 5 feet ,of a bui'lcting that are perpendi,cular to the bui ldi n9 foot; ngs and are less than' 12 inches wi,de and 1 ess than ~ feet deep are not subject to th,is recommendation. Oouglass Pacific sout.r '~st Corporation Project No. 73-130 April 15, 1975 • Page 4 The inspections of foundation preparation, types of materi'als and soil placeme-nt and compaction as well as tests of compaction made during the period of our services on the subject site were in accordance with the local acceptable standards for this period. The conclusions or opinions drawn from the tests and sit~ inspections apply only to our work with respect to grading and represent conditions at the date of our final inspection. We accept no responsibility for" any subsequent changes made to the site by others or by uncontrolled action of water or by failure of others to properly repair damages ~aused by uncontrolled action of water. . WOODWARD-CLYDE CONSULTANTS JEC/JLH/RPW/EHP/we Attachments (5) Douglass Pacific Southwest Corporation (1) Rick Engineering Company" ... ,,:: '~ ,~:i.': t,~:,>.: ~-;~T :: ,r .OMPACTION TESTRESUL1. / ( toe NAME CARL~BAD PALISADES UNIT #1 DATE REf'ORTEOApri 1 15, 1975 Joe NUMBER 73-130 DATES COVERED December 13, 1974 through 'February 25, 1975 PAGE 1 OF 5 MOIIlTURJI: .. lltLD I.AII0RATORY RItLATIVIt DATI: TlI:.T R!:TEST LOCATION EL:EVATION CONUNT DENlIIT'\t' DENlIllTV COMPACTION NUMIIEa 01' OFTI:ST 'I\, DI'CYWT. pc,.. I'cr' 'I. OF·LAB. DENS. 1974 DEC. 13 163 NORTHEAST OF LOT 40 1141 12.3 113.2 121. 5 93.1 164 NORTH OF LOT 46 1.20' 13.0 115.8 121.5 95.3 165 LOT 110 136' 9.9 114.3 125.5 9).0 166 EAST 0 F LOT 42 118 1 12.3 110·.2 118.0 93.3 167 EAST 0 F LOT 46 1241 12.3 114.3 121. 5 94.0 168 LOT 84 136' 11.7 116.5 127.0 91.7 DEC. 16 169 LOT 76 126' 7.5 103.0 125.5 82.0. 170 LOT 81 124' 10.5 114. 1 125.5 90.9- 171 HEST OF LOT 80 126 1 10.5 113.5 125.5 90.4 172 169 LOT 76 126 1 9.9 113.8 125.5 90.6 17'3 NORTHEAST OF LOT 69 80 1 . 16.3 109.3 115.5 94.6 174 NORTHEAST OF LOT 69 82 1 13.6 114.2 121'.5 93.9 175 NORTH OF LOT 69 84 1 14.3 108.0 115.5 . 93.5 DEC 18 176 NORTHEAST OF LOT 87 1221 10.5 115.2 127.0 90.7 177 lOT 93 126 1 13~6 108 . .8 117.0 92.9 178 LOT 82 ·12.8' 14.3 107.5 115.5 93.0 DEC . .19 1:79 . LOT 118 .1381 13.6 106.3 1] 5.5 92.0 180 SOUTH OE LOT 104 138 1 13.6 105.5 115.5 91.3 DEC. 20 181 LOT 32 FG 106 1 12.3 122.2 127.0 96.2 182 LOT 32 FG l06 1 9.9 121. e 127.0 95.2 DEC. 23 183 LOT 101 140' 11.7 113.5 121. 5 93.4 184 LOT 116 142' 12.3 110.7 121. 5 91.1 185 LOT 108 1421 12.3 106.5 117.0 91.0 ~ D~C. 24 186 NORTHEAST OF LOT p9 86' 14.3 1'08.2 115.5 93.6 187 NORTHEAST OF LOT 69 88' 1'1 .7 109.5 117.0 93.'5 188 lOT 98 1441 11.1 108.0 117.0 92.3 189 NORTHEAST OF LOT 71 90' 11.1 llL3 117.0 95.1 190 NORTH OF LOT 75 92' 11. 7 110.6 117.0 94.5 DEC. 26 191 EAST OF LOT 96 94 1 14.3 109.0 115.5 94.3 192 NORTH OF LOT 70 96' 11.7 111. 3 121. 5 91.6 193 NORTH OF lOT 73 98' 12.3 114.2 121. 5 93.9 194 LOT 96 100' . 14.3 107.2 115 .. 5 92.8 :.MPACTION TEST RESULT:~. CARLSBAD PALISADES 'UNIT #1 DATE:REPORTEO April 15, 1975 . )B NUMBER 73-130 )'TES COVERED December 13, 1974 through February 25, 1975 PAGE: 2 OF 5 MOISTURE I'IIELD LASOnATORY .RItLAT/VIE DATil: TEIIT RETEsT LOCATION ELEVATION CONTENT DENalTY DENSITY COMPACTION NUMOER '01' OF'iEST 'If. ORYWT. f'C1' f'C1' 'J. 01' LAO. DE·US. 974 IEC. 27 195 NORTH OF LOT 77 102' 11.1 112.2 121. 5 92.3 . -' ---196 LOT 74 . 104' 12.3 108.3 117.0 92.5 197 NORTHEAST OF LOT 71 106' 12.3 113.6 121. 5 93.4 198 LOT 69 108 1 1L7 110.2 117.0 94. 1 199 SOUTH OF LOT 71 110" 12.3 114.7 121.5 94.4 lEe. 31 200 NORTHWEST OF LOT 75 112' 13.6 105.4 115.5 91.2 201 LOT 71 114' 13.6 104.5 115.5 90.4 202 LOT 68 116' 14.3 116.8 121. 5 96. 1 ·975 IAN. 2 203 LOT 15 118 1 6.4 107.0 118.5 90.2 204 EAST OF LOT 46 120' n.7 1.09.8 118.5 92.·6 205 LOT 70 120' 12.3 110.3 118.5. 93.0 206 LOT 72 1221 13.0 107.5 118.5 90.7 207 LOT 64 122' 12.3 112.3 120.0 93.5 'AN. ~ 208 LOT 66 124' 11.7 106.7 118.5 90.0 209 LOT 73 1.24' 11.7 111. 3 118.5 93.9 210 LOT 79 126' 12.3 109.2 118.5 92.1 211 NORTH LOT 72 126 1 12.3 108.5 118.5 91. 5 212 lOT 77 128' 11.7 111. 9 118.5 94.4 AN. 6 213 LOT 78 130 1 12.3 108.9 118.5 91..8 214 LOT 91 130' 12.3 109.7 118.5 92.5 215 LOT 68 132' 11.7 108.0 118.5 91.1 216 LOT 88 130' 11.7 109.5 118.5 92.4 'AN. 7 2177 LOT 65 128' 11.7 108. 1 118.5 91. 2 218 LOT 83 132' 12.3 ·108.0 118.5 91.1 219 LOT 86 132 1 11 .7 109.0 118.5 91.9 AN. 8 220 WEST OF LOT 68 129 1 12.3 115.9 118.5 97.8 221 LOT 76 128' 11. 7 109.2 118.5 92. 1 222 SOUTH OF LOT 77 130' ' 13.0-108.5 118.5 91.5 AN. 9 223 NORTH OF LOT 38 116' '12.3 110.3 118.5 93.0 224 LOT 99 136' 11.7 111. 7 118.5 94.2 225 NORTH OF LOT 39 1'8' 11.7 109.7 118.5 92.5 226 NORTH Of LOT 38 120' 11.7 106.3 118.0 90.0 . eOMPACTION TEST RESULT. CARLSBAD PALISADES UNIT #1 DATE REPORTED April 15, 1975 • Joe NUMBER 73~130 DATES COVERED December 13, 1974 through February 25, 1975 PAGE 3 OF 5 MOISTURE I'IItLD LABORATORY ,,,/CLATIVE PhTJ: nr:.T IlItTEST LOCATION ELEVATION CONTENT PItNIIITY , DIIN.ITY COMPACTION HUM""" ' 01' OF'TEST % PRYWT. P'CI' I'CI' % Of' LAB. DENa, JAN. 10 227 LOT 76 132 1 12.3 ' 111. 2 118. ~ 93.8 228 40 1221 12.3 112.5 118.0 95.3 229 42 124, ' 12.3 113.2 118. S 95.9 230 39 126 1 12.3 106.9 118.0 90.5 JAN. 13 231 LOT 4" 126' 11.7 111. 8 118.0 ' 94.7 232 46 128 1 11.7 ' 108.0 118.0 91. 5 233 NORTHEAST OF LOT 99 138' 12.3 110.2 118.0 93.3 234 LOT 99 140' 11.7 109.5 118.0 92.7 235 86 133' 11.7 106.9 118.0 90.5 JAN. 14 236 LOT 94 132' 11.7 115.1 127.0 90.6 237 94 134' 11. 1 110.9 120.0 92.4 238 100 142' 11.7 108.3 118.0 91.7 239 106 142' 10.5 107.5 118.0 91.1 240 EAST LOT 99 144' 12.3 109.1 118.0 92.4 JAN. 15 241 LOT 63 130' 9.9 111.8 125.5 89.0 242 241 '63 130' 10'.5 113.1 125.5 90'.1 243 67 131' 11. 1 116.9 125.5 93.1 244 SO 131' 11.7 115.0 125.5 9i.6 JAN. 16 245 lOT 70 132" 11.7 114.2 125.5 90.9 JAN. 17 246 LOT 115 146' 11.7 108.0 118.0 91.5 241 101 146' 12'.3 110.0 118.5 92.S -LOT 69 JAN. 20 248 132' 5.3 103.5 128.5 80.5 249 73 132' 4.7 108.9 128.5 84.7 250 79 131' 6.4 115.9 125.5 92.3 2'51 32 98' 11.7 108.1 127.5 84.7 JAN. 21 252 LOT 105 148' 12.3 110.2 118.5 92.9 253 EAST OF LOT 69 148 1 12.3 109.5 118.5 92.4 254 LOT 119 150' 11.7 110.0 120.0 91.6 JAN 22 255 LOT 104 150' 13.6 109.3 120.0 91.0 256 117 152' 12.3 110.2 121. 5 90.6 257 111 152' 11.7 111.5 121.5 91.7 258 120 152' 11. 7 108.0 118.5 91.1 JAN., 23 259 LOT 97 149' 12.3 112.5 121. 5 92.5 . 260 9S 149' 11. 1 109.6 118.5 92.4 "",~~ ~'O'B-/·NAMJ'E 'OMPACTION TEST RESULT. (MAL CARLSBAD PALISADES UNIT #1 DATE REPORTED April 15, 1975 , JOB NUMBER 73-130 DATES COVERED December 13, 1974 through February 25, 1975 i"AGe: 4 OF 5 MOI.TURIC !'IELD LA.ORATORY R£LATIVE ~.T RETE.T NUIoIDER 01' LOCATION ELEVATION CONTENT DENSITY' DENalTY COMPACTION OF TEST "At DRY'WT. PCI' rcl' % 01' LAB. DEN!'. DATE JAN. 28 261 WEST OF LOT 33, BUTTRESS 1271 12.3 115.8 121. 5 95.3 262 WEST OF LOT 57, BUTTRESS 128' 13.0 113.2 121.5 93 .. 1 263 WEST OF LOT 58, BUTTRESS 130' 12.3 113.8 121. 5 93.6 JAN. 29 264 248 LOT 69 132' 11.7 117 • .2 128.5 91. 2 265 249 73 132' 12.3 118.0 128.5 91.8 266 63 FG 131.5' 13.6 115.6 127.5 90.6 267 66 FG 133.0' 13.0 117.2 127.5 91.9 268 70 FG 133.5' 13.0 117.6 127.5 92.2 269 74 FG 134.0 1 13.6 118.1 127.5 92.6 270 81 FG 132.5' 13.0 116.3 127.5 91.2 271 84 FG 136.0' 13.6 Tl7.4 127.5 ·92.0 272 94 FG 135.3' 13.0 118.9 128.5 92.5 273 77 FG 135.0' 13.0 116.5 127.5 91.3 274 91 FG 136.5' 12.3 116.8 127.5 .91.6 275 ~IEST OF LOT 52, BUTTRESS 132 1 13.6 110.2 121.5 90.6 276 SW OF LOT 276, BUTTRESS 134' 13.0 111. 5 121.5 ·91~7 277 WESt OF LOT 55, BtlTTRESS 136' 14.3 107.3 115.5 92.9 JAN. 30 27.8 LOT 51 132' 12.3 117.3 1.27.0 92.3 279 46 132' 13.0 117.0 127.5 91.7 280 54 131' . 13.0 116.6 127.5 . ,91. 4 281 44 131' 12.3 117.2 127.5 9L9 282 40 129' 11.7 116.8 127.5 91.6 283 37 128' 12.3 117.5 . 127.5 92.1 284 33 127' 12.3 118.3 127.5 92.7 JAN. 31 285 LOT 49 FG 133. l' 12.3 116.0 127.0 91. 3 286 55 FG 132.5' 12.3 117.6 127.5 92.2 287 47 FG 133.3' ' 13.0 119.5 127.5 93.7 288 35 FG 128.7' 12.3 117.2 128.5 91.5 289 38 FG 129.8' 13.0 116.5 127.5 91.3 290 41 FG 130.5' 13.6 117.9' 127.5 92.4 291 117 154' 13.6 11'6.9 128.5 . 90.9 292 109 150 ' 12.3 118.3 128.5 92.0 FEB. 7 293 LOT 100 150' 13.0 117.2 128.5 91.2 294 120 154 ' '\3.6 117 .6 128.5 91.5 295 109 150' 13.0 118.5 128.5 92.2 296 103 152 ' . 13.0 116.4 128.5 90.5 297 112 154 ' 13.6 119.2 128.5 92.9 298 105 153' 13.6 118.7 128.5 92.3, .OMPACTION TEST RESUL. ' CARLSB~D PALISADES UNIT #1 .JOB NUMBER 73-130 DATESCOV.ERED December 13, 1974 through February 25, 1975 DATE.REPORTED Apri 1 15, 1975 PAGE 5 OF 5 MOISTURE I',ELD LABORATORY RELATIVE DATE nST Rf:TEST NUNBER or FEB. n 299 300 301 302 303 FEB. 12 304 .305 306 307 308 309 310 F~B. 13 311 312 313 314 315 251 ,FEB~ 24 316 317 318 319 320 321 322 323 FEB. 25 324 325 326 LOCAT'ON ELEVATION COlnltNT DENSITY DItNS'TT COMPACTION OF TEST ... DItY WT. reI' reI' % 01' LAB. DEN •• WEST OF LOT 33, BUTTRESS WEST OF LOT 56, BUTTRESS NORTH OF LOT 35 SW OF LOT 33, BUTTRESS NORTH OF LOT 35 WEST OF LOT 52, BUTTRESS NORTH OF LOT 35 WEST OF lOT 57, BUTTRESS W~ST OF LOT 33, BUTTRESS NORTH OF LOT 35 138' 140' 116' 142' 119' 144' 122' 146' . 148' 12.3 13.0 12.3 12.3 9.3 WEST OF LOT 52, BUTTRESS WEST OF LOT 58, BUTTRESS ' 125' 150' 152' 10.5 5.3 12.3 13.0 9.3 8.7 9.3 WEST OF LOT 33, BUTTRESS 154' 12.3 WEST OF LOT 55, BUTTRESS 156' 8.7 WEST OF LOT 58, BUTTRESS FG 157.7' 10.5 WEST OF LOT 55, BUTTRESS FG 158.2' 9.3 LOT 32 98' 13.0 LOT 111 108 96 99 102 106 116 120 LOT 59 56 43 FG 155.5 1 FG 151.5' FG 151.5' FG 152.4' FG 153.6' FG 154.8' FG 156.0' FG 155.3 ' 9.9 6.4 5.8 4.7 8.7 10.5 11. 1 9.9 FG 124 .. 5' 8.7 FG 131.0' 9.9 FG 132.2' . 8.7 111. 5 11 J. 2 110.7 117.0 107.3 110.9 111.2 112.2 105.8 116.0 117.8 118.3 113.2 117.5 1,19.2 116.7 116.5 118 .. 4 116.8 117.2 116.5 115.9 116. 1 117.3 116.7 116.3 117.5 117.,9 121. 5 121. 5 115.5 127.0 119.0 121.5 120.0 121. 5 115.5 128.5 127.0 127.0 121.5 127.0 128.5 128.5 127.5 127.5 128.5 128.5 128.5 120.0 128.5 128.5 128.5 127.5 127.5 127.5 91. 7 93.1 95.8 92. 1 90. 1 91.2 92.6 92.3 91. 6- 90.2 92.7 93. 1 93.1 92.5 92.7 90.8 91. 3 92.8 90.8, .91. 2 90.6 96.5 90.3 91.2 90.8 91. 2 92.1 92.4 , I I . , ~ 7 JOB NAME JOB NUMBER .OMFACTION TEST RESUL" , " CARLSBAD PALISADES UNIT #1 DATE REPORTED April 15 ~ 1975 73-130 (STREETS) I DATESCOVEREO December 6, 1974 through J-anuary 28, 1975 PAGE 1 OF' i DATE TKaT RETEST Nlholl!E:ft 01' MOISTURK .. IIELD LA~OR~TpRY ftl!:L,o\TIVE ELEVATION CONTI!:NT DENallTY DleNalTV CO",,.ACT,ION , OF TEST % DRY WT. PCI' -"CI' % 01' LAD. DI:NS. DEC. 6 S-5 PALISADES DRIVE: STA 3+63, -SOUTH HALF 134 1 13.6 112.2 ·121. 5 92.3 DEC. 13 S-6 PALISADES DRIVE: , ,STA 5+52, SOUTH HALF 138 1 10.5 116.2 127.0 91.4 DEC. 24 S-7 PALISADES DRIVE: STA 5+83, NORTH HALF 1421 11. 1 117 .5 127.0 92.5 - JAN. 21 S-8 PALISADES DRIVE:. STA 8+50, NORTH HALF 58 1 10.5 109.3 ll8~ 5 92.2 JAN. 24 S-9 PALISADES DRIVE: STA 8+55, NORTH HALF 60 1 11.7 111. 2 121. 5 91.5 S-10 STA 8+62, NORTH HALF 62 1 11. 1 108.6 118.5 91.6 JAN. 27 $-11 PALISADES DRIVE: ----STA 4+66, NORTH HALF 1441 13.0 112.4 121. 5 92.5 .. S-12 STA 5+28, SOUTH HALF 146 1 11.7 ·110.2 118.5 92.9 JAN. 28 S-13 PALISADES DRIVE: STA 6+18, NORTH HALF 148 1 12.3 . 111.0 121.5 . 91.3 FEB. 25 S-14 PALISADES DRIVE STA 4+62 SOUTH HALF 145 1 9.9 114.2 121.5 93.9 '.}OMPACTION TEST RESUL.:' CARLSBAD PALISADES UNIT #1 DATE REPORTED Apr; 1 15, 1975, I ~ r 0' .JOB NUMBER 73-130 (STORM DRAIN) DATES 'COVERED January 8, 1975 through January 23, 1975 PAGE SO-1 01" SO-l MOISTURK P"IELD LABORATORY RKLA1'IVE DATE TIts,. IIETE'T LOCATION ELEVATION CONTENT DENalTY DENalTY COMPACTION NUMBER 01' DF'TEST 'lit r;nty viT. I"CI' I"CI' % OF,LAD. DENa. ---- JAN. 8 SD-1 BETWEEN LOTS 75 AND 76 126 t 11. 7 98. 1 118.5 82.7 JAN. 9 SD-2 SO-1 BETWEEN LOTS 75 AND 76 126' 11.7 104.9 118.5 88.5 SO-3 SO-2 BETWEEN LOTS 75 AND 76 126' 11.7 107.8 118.5 90.9 JAN. 22 SO-4 BETWEEN LOTS 3 AND 4 93' 12.3 94.9 115.5 82. 1 SO-5 50-4 BETWEEN LOTS 3 AND 4 92' 11. 7 104.9 115.5 90.8 JAN. 23 SO-6 BETWEEN LOTS 3 AND 4 94' 9.9 109.4 121.0 90.4~ 130 120 110 100 90 MECHANICAL ANAlYSI S DIRECT ~iEAR TEST DATA 1 2 3 Dry Density, pcf 106.7 -- 100 3 4 ~ (0 IW 200 80 .~ \\ Initial Water Content. % 12; 7 . - - Final Water Content. 'to 17.2 - - Apparent Cohesion. psf 240 -- Apparent Friction Angle. c 28 - - 1\\ I\~ ~2 1\ ~-~*' 1'-. 1 -U 1--'._ r--~."... r-.-.~ CI') !;i 60 0;. I-ffilJO (,.) IX UJ 0..20 o I I I I . I I I I 1000 (00 10 (0 0 ( 0 01 0 001 . . . 0> \ 1\ 1 . WZE'RO AIR VOIDS CURVES GRAnl SIZE IN ~~ILLI~EtERS \ \-EOB8lESIG~ArEf I cl ~r f jSILT & CLAY ,I .~ \ \ :\ V2.70 S.G. \ PLASTICI1Y CHARACTERrSTICS 1 \ ~2.60 S.G. 2 3 \' \;V 2.50 S. G. Liquid Limit. 1, -36 29 .. . F\. "-l 1\ Plasticity Index: % NP 21 l2 3 f--l-./ \ ~\ ;' \ Classification by Unified Soil 2 r-f.-! \ 1\ i\ Classification System SM SC SC I /' '" 'tl \ .. 1 -V ~ l\ [\ .... 7' u 1/ ~\ \ Q. I-~ l\ f\ SWEll TEST DATA r; , \ ~ \ 1\ f\ Initial Dry Density. pet t--f\ Initial Water Cont~nt. ~ % :::> \ \ [\ .. . .. >-load. psf "" Q I\~ Percen t Swe II '\ 1\ \ r\ t'\ ~ \ SAMPLE LOCATION '\ " r\ .. .\. ,,).. 1 Pad 94 I-IAXIIoIUM DRY 1 2 3 r\ 2 Pad 120 OENSI TY.pcf 119.0 127.0 125.5 ~D. 3 Pad 96 ~I\! OPTI~ ~OISTURE C~lEHT. % 12.5 10.0 MOISTURE CONTENT 'f. 10 20 LABORATORY COMPACTION LABORATORY COMPACTION TEST METliOD: ASTM -D 1557-70 A 10.0 I\. ~ i'\. 30 I\. ~'\. ~~) Fill SUITABILITY TESTS CARLSBAG PALISADES UNIT NO. 1 hOOlYv-JARD -Gl Z I ENSK I & ASSOC IATES CONSULTING SOl LAND FOUtWATlOO ENGINEERS MID GEOLOGISTS SAN DIEGO. CALI IA IIlO 130 120 110 100 90 - MECHAA I CAl AHAL YS I S DIRECT SHEAR TEST.DATA Dry Density, pcf : 100 3 l "10 41J 200 80 .. ;j. 4 ~ :\' h Initial Water Content. % Final Water Content. 1- Apparent Cohesion. psf Apparent Friction Angle. 0 \\ .. "'"'\\ 5~ ~ " ..... '--, r--.... --r--......... -..::::: ." ~ 60 ~. f-GJIlO <..> 0:. ·LLJ 0..20 o .L 1 I I I Lt .1 J 1000 100 10 I 0 0 I 0 01 0 001 \ r\ . ~lERO AIR VOIDS CURVES GRAIN SllE Ilf MILLIMETERS \-ICOBBLESI G~Ar~~ I c I ~N!~ ; ISILT .& CLAY I ~ \ \ \ \ ~2.70 S.G. PLASTICITY CHARACTERISTICS 1\\ ~2.60 S.G. 4 5 6 \ 2.50 S.G. Liquid Limit. r. 33 v 34 37 '\ \ ;\ Plasticity Index. ~. 15 11 20 \ 1\ Classification by Unified Soil ;,A-~ ~ Classification System SC SC SC / 1\' t\.\ -+-I /' r\ ~~ .... 0 '/ 01 ~\ \ 0.. f-5 1---; rI .I " i\ r\ SYt£LL TEST DATA 4 5 ~ \ \ 6 ..... Yi 6 r hi .\ \ \ Inilial Dry Density. pcf -105.7 -f--[\ \ z: Initial Water Content. % 12. 1 :;:::. - - >-\ \ 1\ 150 '" Load. psf 0 t\\ -. -~ Percent Swell 3.9 \ \ \ -- \ f\ ~ r\ \ SAMPLE LOCATION \\ \. - l\ ~~. 4 Pad 15 J.4AXIMUM DRY 4 5 6 r'. 5 Pad 53, Lot 2 - DENSI TY. pcf 121. O. 118.0 117.0 ~~ 6 Pad 22 ~~~ OPTI~ MOISTURE Co!(TEHT. 'to 11. 5 12.0 I MOISTURE CONTENT 10 20 LABORATORY C()PACTI~ LABORATORY COMPACTION TEST METHOD: ASH1-D 1 557 -70 A '!. 12.5 r\. r\.r\. 30 r'\. .... ~~ ~~I .FILL SUITABILITY TESTS, CARLSBAD PALISAnES UNIT NO. 1 WOODWARD' - G I Z I ENSKI &,ASSOC I ATES . COHSULJI HG SO I L AMD FOUHDAHON SAN DIEGO, CA -. • Vi --" ;:;;;--. MECHMICAL ANALYSIS 100 3 ! ~ 10 110 200 DIRECT· SHEAR TEST DATA ~~ ~ 80 Dry Oensi ty. pcf <!) ,\ x Initial Water Content. r.. : ~ 60 1\\ \-r-.7 1-\\ -< ~..:; 0-Final Water Content. ~ l-. \\ '\. ffilIO Apparent Cohesion. psf c.> .~ "-"-0::. W """"'=: .:~ ~ Apparent Friction Angle. 0 0.. 20 (j 0 1 I 1 I J I I I I 140 . 1000 100 10 1.0 0.1 0.01 0.001 \ ~-' ~ZERO AIR VOIDS CURVES GRAIN SIZE IN MILLIMETERS \ \-ICOBBLESI GRAVEL I SAM~ "ISILT & ~LAYJ ~ \ c I f c 1m t 1\ 1\ \ \ \ V2.70 S.G. - 130 \ty2.60 S.G. PLASTICITY CHARACTERISTICS 7 8 9 1\ 2.50 S.G. liquid limit. "/0 34 36 to. -~ r-~\ ~~ Plasticity Index. % 15 -20. 1/\ ~ CI·assifi-ca.tion by Unified Soil 120 9-'--~/ ). r'\'!\ Classification System CL SC SC V 1\ ~\\ R ~ V i ~ '+-. 0 (,) L a. I~~ r: 7 ./ ~. :r -", SWELL TEST DATA 9 9A <!:J ~ \ ~ 110 -LU 116.1 115.0. 3: \ \ 1\ Initial Dry Dehsity. pef . I--1\ \ Initial Water Content. ~ 11.4 13:6 :z: :::> >-\ ~ ~ Load. 'psf 160. 160. 0::: Cl [\1\ t- \ \ 1\ Percent Swell 3.2 . 0..8 100 1\ 1\. r'. .. [\,. SAMPLE LOCATION \\ 1\ 1\ ~ 7 Sect; on A-A, Stat; on 488+-50. 90 MAXIMUM DRY 7 8 9 r'\ -8 Pad 1 DENSI TV. pcf 115.5 121. 5 127. a ~~ 9 Tamarack Av_e, Stat; on 2+00 OPTIMUM MOISTURE f\~ CONTENT. % 15.0. 13.0. 11.0 ~ ['),. ~ ~' ~ MOIS.TURE CONTENT c' . ~1--..) 80 0 -7· 10 20 30 40 LABORATORY COMPACTION TEST FILL SU I TAB'I LI TY TESTS LABORATORY COMPACTION CARLSBAD PALISADES TEST J.1EJHOD: ASTM-O 70 A UNIT NO. 1 WOODWARD - G III 8~SK I & 'ASSOC I ATES CONSULTING SOIL AND FOUNDATION ENGINEtRS AND GEOLOGISTS SAN DIEGO. OALIFORNIA . DR. BY: GS SCALE: ---PROJ.NO: 73-130. J. jfA,tJ , CK'D BY: DATE: 12/1317..1 PAGE 3 of' Ll. 1..0 130 120 110 100 90 DIRECT SHEAR TEST DATA 10 11 Pry Density, 'pef':--107.7 -Initial Water Content. % -13. 1 Final Water Content. r. -16.2 Apparent Cohesion. psf -,240 Apparent Friction Angle. 0 -28 \ 1\ ~ZERO AIR VOIDS CURVES \- ~ \ \ \ '\ y2.70 S.G. ~2.60 S.G. IX-V 2. 50 S. G. \.....- / \ \ 1\ ~G h;.' rI 1\ ,,\ / \ \ 1\ II --~ ~ ~ '~ to 1 /. \' ~[\ .... u / 0- f-h . \' f~ !\ ~-~ [\\ '" ~ \ 1\ r\ f--1\ \ z: ::> >-\ \ t\ at: Q ~ f\\ \ \ 1\ '\ r\ 1\ f\ ~\ \ \ \. 12 1013.5' 13.0 18.0 420 CI :Ie en 100 80 ~ 60 0- f-ffillO <..) IX W n. =:; -... ~CHMHC"l ANALYSI S 3 I ~ 10 IK) 200 1\-:\ ~ -y\ \ \\ . \ ~ ~ 12 \,\ \. 1 -~~ \ ~ -10 25 20 "'-........ J---o I I 1 .1 I " , I -r-~',::: 1000 100 10 I 0 0 I 0 01 0 001 . . GRAiK SIZE 1M HILLIMETERS [COBBlES~RA~E~ I SAM[_ c I· c 1 m f I~ I L T & CLAY I -- PLASTICITY CHARACTERISTICS 10 11 12 liqu.id Limit, 1. 28· -- Plasticity Index. r. 11 NP NP Classification br Unified Soil Classification System SC SM -SM SWELL TEST DATA 10 11 12 Initial Dry Density. pet 115.2 -- Initial Water Content. % 9.1 -- Load. psf -160 -- Percen t Swe 11 1.3 -- . - SAMPLE LOCATION ,. \ ,~ 10 Tamarack Station 14 MAXlt-IlM DRY 10 11 DENSITY. pet 127.0 120.0 OPTIIolIM MO I STURE 9.5 12.5 C~TEHT. % MOISTURE CONTEHT 'f, 10 20 LABORATORY COMPACTION LABORATORY COMPACTION TEST METHOD: ASTM-D1557 -70 A 12 118.5 13.'0 ~ 11 Lot 58 ~~~ 12 Lot 59 ~r\.r\. ~ ~~ ~ )..., FILL SUITABILITY TESTS CARLSBAD PALISADES UNIT NO. 1 WOOOlvJARQ. -51 Z I ENSK I & ASSOC I ATES COtISULTING SOIl: AND FOUNDATI¢H ENGINEERS AltO GEOLOGISTS SAN DIEC-<>. CALI IA ,. • MECHM I CAL ANAL YSJS 3 ! ij 10 40 200 100 1'\ '" " DIRECT SHEAR TEST DATA 13 14 [\'1 80 Dry Dens i ty, pcf " . 113.8 115.5 CI 14 .\ \ ·]3 _ :z:: I nj t j alWater Content. % 10. 1 11.5 en \ '\ ~ 60 Q. \ Final Water C~ntent. ~ 14.4 13.1 'I-' 'I, \ \ ffi40 Apparent Cohesion. psf 210 330 <..> '\ , 0. W ~ Apparent Friction Angle. e. 29 33 Q.. 20 K 0 I I I I '1 1 1 1 ---=- IIW 1000 100 10 1.0 0.1 0.01 0.001 \ 1\ ' ~ZERO AIR VOIDS CUKVES GRAIH SIZE IN ,~~LLI~ET~RS \-[COBBLEsl GRAVEL I SAH~ lSI LT& CLAY I to \ clf clm f, . 1,\ , \ y2.70 S.G. 130 PLASTICITY CHARACTERISTICS 13 14 I \y2.60 S.G. -f-'-13 X-~~2.50 S.G. Liquid Limi t, r. 29 -, -y 1\ ~ l~ Plasticity Index. 10 NP 9 l\\\ ' . J .,-1 [\ Classification by Unified Soil 120 \ \ ~ Classification System SM SM-SC f--"""-14 -1\ \ \ \ 1\ 1\ , .... (.) 1\ \ \ 0- f-\ 1\ 1\ SWELL TEST DATA 13 14 :z: .~ c:> 110 W f\ ~ \ i\ r\ Initial Dry Density, pcf -115.6 I-,-f\ Initial WQter Content. % 11.4 % -:::> \ \ f\ .. >-Load. psf 160 0::: -c r\ 1\\ Percent Swell 0-O. 1 \ \ 1\ 100 '\ r\ \ \ \ - '\ " SAMPLE LOCATION ~ t , '\ . \\. 13 Borrow Area Upp~r Tamarack 90 MAXIMUM DRY 13 14 i\ 14 Borrow Area Upper -Tamarack DENSITY. pcf 127.5 128. ~ ~~, OPTIMUM MOISTURE 10.0 11.C r\ f\l. CONTENT. 1-'" r\..~ r\.. ~'\. MO!STURt CONTENT, 1-~~) 80 0 10 20 30 40 LABORATORY CCW ACT I~ TEl,T .-FILL SU I TABI LI TV n;STS LABORATORY COMPACTION TEST METHOD: 8SH1-Q ] 55Z-Z0 A CARLSBAD PALISADES UNIT 1 WOODWARD -GIZIENSKI & ASSOC I ArES COf(SULHNG SOl LAND FOUNDAT'ION ENGINEERS AND GEOLOGISTS SAN D I EGO, CA LI FORNI A OR. BY: AS 'SCALE: -iPROJ. 1010: 73-130 CK'D BY; c./# DATE 4/1':J/I':J :PAGE T of • • WOODWARD· GIZIENSKI & ASSOCIATES. 3467 ·Kurtz Street San Diego California 92110 (714) 224-2911 CONSULTING SOIL AND FOUNDATION ENGINEERS AND GEOLOGISTS All affiliate of Woodward -Clyde Consultallts December 13, 1974 Project No~ 73-130 Douglass Pacific Southwest Corporation p . O. Box 1114 Carlsbad, California 92008. Attention: Mr. Leonard O. Minor and Mr. Richard Epson FINAL REPORT OF ENGINEERING OBSERVATION AND COi~?ACTIO:'J TESTING CARLSBAD PALISADES UNIT NO. 1 CARLSBAD TRACT 73-8 (63 ACRE SITE -AQUA HEDIONDA RANCHO) LOTS 1 THROUGH 31 CARLSBAD, CALIFORNIA In accordance with your request and our proposal ,dated July 29, f974 (reissued September 11, 1974), we have provided soil engineering services in conjunction with the grading of the subject site. These services i.ncluded; (1) Engineering observation of the grading ope~ation. (2) Observation of the removal of loose surface and alluvial soil prior to placing fill. (3) Observation of the removal of potentially highly expansive soil from the finish grade pad areas and replacing it with nonexpansive soil. (4) Performing period'ic geologic inspections of the slope areas. (5) Observation of the special preparation of foundation areas for fill slopes over 50 feet in height. (6) Taking field density tests in the fill placed and compacted. (7) Performin9 laboratory tests on representative samples of the material used for fill. , . D~~-;i~ss Pacific Southwest Corporati-on Page 2 ' Project No. 73-130. ' December 13, 1974 _ ." Site preparation, compaction and testing w~re done between October 25 -and December 11, 1974 in accordance with the, "S pec ifications for Controlled Fi 11" in our report entitl ed II Soil Invest; ga-ti on for the Proposed Rancho Agua ~-Iedionda -63 Acre Site, Carlsbad, California," dated March 3,1973, and addenda dated May 16,1973 and October 1,1973 (revised October 26, .. 1973) and letter of August 22, 1974. . ' - 'GENERAL GRADING AND COMPACTION CONTROL PROCEDURES Fill was placed, compacted a~d tested oh all the lots covered in this , report, that is, Lots 1 through 31. Preliminary site preparation included removing loose or porous surface soils where encountered and special preparation of the foundation for the fill slopd at the southeast site corner which was done in accordance with our recommendations and is similar to IISection A-A" of the approved gtading plans. As the site grading progressed, the compaction procedures were observed, and field density tests were made to determine the relative compaction of the fill in place. Field observations and field density test results indicate that the fill has been compacted to 90% or more of maximum laboratory density. The approximate locations of fi'eld density tests and the limi,ts - of compacted fill have beel') recorded on a copy of the grading plan for reference. The results of field density te$ts and of relative compaction, expressed as a percent of maximum laboratory density, are given on the attached forms. Laboratory tests to determine moisture. ... density relationships, maximum , ,dry density, optimum moisture content, grain size distribution, p-lasticity characteristics, and strength and swell characteristics were performed on representative samples of the material used for fill. The results of laboratory tests are given on the attached forms. FINISH GRADE PREPARATION During the grading operation certain lots were specially treated to provide a specified depth of selected soil at rough grade. Laboratory tests and visual inspection ind-;cate that nonexpansive fill was placed \'1ithin 3 feet of rough grade on all building areas of the pads noted herein, and wit~in 2 feet of rough grade in other areas including the remainder of the level pad and private areas and parking areas. The cut porti ons of Pads 1, 21, 22, 30 and 31 ~/ere undercut for potenticd ly expansive soil to a depth of 3 feet below rough lot grade and within the proposed building area plus 5 feet and to a depth of 2 feet ,in other areas and replaced with nonexpans;ve soil. , , WOODWARD· GIZIENSKI & ASSOCIATES C:ONSULTINII SOIL AND' FOUNDATION [NQINEERS AND QtDLOGIITS- • Rough lot grade" is defi ned as that grade set in the fi e 1 d by the grade checker from reference" stakes establ ;shed by the surveyor and r"epresents rough grade at the time we were inspecting the removal and replacement of expansive soils. Likewise the depths of undercutting of expansive soil and/or depths of placement of nonexpansive soil were in accordance with measurements made by and grades set by the contractorls grade checker. FOUNDATION RECOM~1ENDATIONS (ALL LOTS) (1) Foundations for single or two-story multi-dwelling structures placed on nonexpans;ve properly compacted fill may be designed for a bearing. " pressure of 2,500 psf (dead plus live loads) at a depth of 12 inche~below compacted fill lot grade. Footings should have a minimum width of Il inches. These pressures may be increased by one-third for lo"ads that" include wind or seismic forces. (2) Structures that will .not tolerate differential settlements (such as foundations, swimming pools, concrete decks, walls, etc.) should not be located within 5 feet of the top of a slope. FootingS located ~16ser t~an 5 feet from the top of a slope should be extended in depth until the outer bottom edge of the footing is 5 feet horizontally from the outside face of the slope. (3) It should be anticipated that structures, s~ch as swimming pools, that extend below a depth of 2 feet may be founded in potentially expahsive soils and may require special treatment or design. LIMITATIONS The elevations of compaction tests, shown as finished grade (FGY tests, correspond to the elevations shown on the undated grading plans for IICarlsbad Tract 73-8, Carlsbad Palisades Unit No. 1", prepared by Rick tngineertng Company, San Diego, California. Elevations and locations shown in this. report are based on field surveys established by others. This report covets the fill placed under our observation during the ~ates specified herein. Additional fill pl.aced after these dates, as well as the backfill in utility trenches located within 5 feet of a building and" greater than 12 inches deep, or any trench 5 feet or more from a building and in excess of 5 feet in depth, should be compacted under the observation of this office and tested to" assure compliance with the earthwork speCifications for the project. This office should be contacted at least 24 hours prior to backfilling operations. Utility service trenches within 5 feet of a building that are perpendicular to the building footings and a·re less than 12 inches wide and less than 3 feet deep are not subject to this recomrnenda t ion. WOODWARD . GIZI~NSKI & ASSOCIATES CONSULTINO SOIL AND YOUNDATION-ENCiUN£f,1tS AND cEOt.OQISTS • The inspections of foundation preparati·on, types of materials and soil placement and compaction as well as tests of compactien made during the period of our services on the subject site were in accordance with the local acceptable standards for this period. The conclusion'S or opinions drawn from the tests and site inspections apply only to our work with respect to grading and represent conditions at t~e date of our final inspection. We will accept no responsibility for any subsequent changes made to the site by others or by uncontrolled action of water or by failure of others to properly repair damages caused by uncontrolled action of water. WOODWARD-GIZIENSKI & ASSOCIATES Attachments (5) Douglass Pacific Southwest Corporation (1) Rick Engineering Company WOODW'ARD· GIZIENSKI & ASSOCIATES CONSUlTING lOll AND fOUNDATION ENQINUIIS AND Q[OlOGIITi T "...... "" fOMPACTION TEST RESUL. ~;}O.NAMI CARLSBAD PALISAD S UNIT #1.. . . DATE REPORTED December 13, 1971 JOB NUMBER 73-130 OATES COVEftED October 31 ,throtigh D~cember 11,1974 PAGE 1 O~ 6 I MOISTURE ,.'ELD LABORATCun "EUTIVE DATE TIlaT RETEST LOCATION ELEVATION CONTENT DENS ITT DEllZITY COI41'ACTIOH NUMBER 01' OF TEST '!Io DIlYwi', PCI' PCI' % 01' LAB. DEHS. OCT. 31 1 SOUTHEAST OF LOT 17 46 ' 8.7 '103.7 121.0 85.4 2 1 SOUTHEAST OF LOT 17 46' 9.9 1 ]8. 2 121.0 97.6 " NOV. 14 3 NORTH OF LOT 105 108' 8.7 119'.1 127.0 93.7 4 SOUTH OF LOT 101 106' 9.9 114.6 ' 125.5 91.3 5 NORTH OF LOT 100 100' 7.5 114.0 121.0 94.2 6 NORTH OF LOT 93 102' 11.1 116.8 127.0 91.9 ~OV . 4 7 SOUTHEAST OF LOT 17 48 ' 7.5 .105.6' 121.0 87.2 8 SOUTHEAST OF LOT 17 48' 6.9 109.0 121.0 90.0 9 EAST OF LOT 17 50' 11.1 115.0 127.0 90.5 10 SOUTHEAST OF LOT 17 52' 10.5 117.8 127.0 92.7 11 EAST OF' LOT 17 54' 11.7 1T2.3 127.0 88.5 i 10V. 5 I 12 SOUTHEAST OF LOT 17 56' 8. 1 117.1 121.0 96.4 13 LOT 17-58' 10.5 115.0 121.0 . 94.9 14 11 EAST OF LOT 17 54' . 11. 7 116.8 127.0 92.0' 15 EAST OF LOT 17 62 ' 11.1 113.9 127.0 89.6 OV. 6 16 EAST OF LOT 18 64' 7.5 110.3 121.0 91.0 17 LOT 15 66' , 6.9 123.2 125.5 98.4 18 SOUTHWEST OF LOT 14 68' 8.1, 113.9 121.0 94. 1 19 15 EAST OF LOT 17 62' 10.5 117.8 127.0 92.5 20 LOT 14 68' 10.5 117.8 125.5 ·'.93.8 21 SOUTHWEST OF LOT 12 6B' 8.7 118.0 117.0 100+ 22 NORTH OF LOT 26 70' 9.9 118.4 117.0 100+ )V. 7 23 NORTHEAST OF LOT 15 54 1 9.3 122.0 125.5 97.1 -.--24 NORTHEAST Of LOT 17 56 ' 12.3 111. 5 115.5 96.4 25 EAST OF LOT 17 58' 13.0 1l6.1 121.0 96.1 26 EAST OF LOT 17 70 ' 11. 1 110.4 121.0 .91.1 27 WEST OF LOT 11 72' 16.9 115.0 127.0 90.5 28 LOT 11 741 9.9 115.2 125.5 91. 7 29 EAST OF LOT 17 60' 13.0 116.0 125.5 92.5 30 LOT 17 72' 14.3 107.0 115.5 92.8 31 LOT 14 74' 13.6 108.6 115.5 94.0 32 EAST OF LOT 17 64' 13.0 107.2 115.5 93.0 V. 8' 33 WEST OF LOT 15 76' 10.5 112.2 118..0 95.4 ----34 LOT 14 76 1 15.6 110.2, 115.5 95.5 ,. 35 EAST OF LOT 17 74' 13.6 116 .. 0 . 117.d 99.0 36 EAST OF LOT 17 66' 10.5 113.5 118.0 96.1 o· 37 EAST OF LOT 18 78' 14.9 108.8 115.5 94.6 : I 38 NORTH OF LOT 16 7B' 12.3 107.2 115.5 93.0 39 EAST OF LOT 17 68 ' 8.7 108.2 118.0 91.8 ! 40 NORTHEAST OF LOT 17 62 ' 9.3 111.1 118.0 94.4 ~ . WOODWA~~· GIZIENSKI & ASSOCIATES COHSULTINI! IOiL ANO rOUNOATlON lHGINURS ""'9 G[OLOCOISf1 I I' l -~-~~~~".-.... ~ ~ ...,.-.~-.. ............... ""~~~ ~ , ~~I,~~llUr~~",~, •• '!l-"" rMPACTION TEST RESUL. CARLSBAD PALISADES UNIT #1 DATE REP9RTIED December 13, 197 JOB NUMBI);R 73-130 ' . PATEl!;! COVERED October 31 through December 11,1974 PAGE 2 OF 6 MO'3TURII: "'Eu) LA.OR .... TORY Rm..AT'VE DATI!: nST RITEST LOCAT'OH ELEVATION CO/iTILNT DENalTv DENSITY COlA PACTION HUN.Eft or Or-TEST "J\o DRYWT. 'rer 1'(;1' % or ·LAa. DENa. NOV. a 41 LOT 10 78 1 7.5 106.6 117.0 91.0 42 LOT 12 80 1 9.3 112.8' 118.0 95.6 NOV. 11 43 LOT 18 80 1 12.3 114.2 118.0, 97.0 44 SOUTHWEST OF LOT 13 80 1 11.1 109.9 117.0 93.8 45 EAST OF LOT 17 82 1 11.7 107.0 11-5.0 92.6 46 EAST OF LOT 18 82 1 6.9 ,118.4 121.0 93 .• 9 47 LOT 9 84 1 n.1 107.7 115.5 93.2 48 SOUTH OF LOT 19 84' 14.3 111. 1 117.0 94.8 49 NORTH OF LOT 14 62' 9.9 106.6 115.5 92.3 50 LOT 13 84 1 10 .. 5 109.6 ·117.0 . 93.5 51 NORTHEAST OF LOT 15 64' 12.3 lOB,. 5 115.5 ' 93.8 52 LOT 24 86 1 10.5 108.4 117.0 92.7 53 NORTH OF LOT 15 66' 11.7 110.2 1.15.5 95.4 54 NORTHEAST OF LOT 14 68' 10.5 113.4 11B.0 96.1 ~OV .• 12 55 SOUTHEAST OF LOT 14 88' 9.3 113. 1 117.0 96.8 56 EAST Of LOT 14 70' ll..? 114.5 118.0 97.0 57 LOT 10 86' 11. 1 112.7 11B.O 95.4 58 NORTHWEST OF LOT 19' 88' 11.1 110.1 117.0 94.1 59 NORTH OF LOT 27 88' 10.5 110.9 118.0 93.8 60 NORTHEAST OF LOT 16 72' 10.5 114.9 118.0 97.4 61 WEST OF LOT 9'3 106 1 12.3 lll.9 119.0 89.6 62 NORTHEAST OF LOT 15 741 11.7 107.3' 115.5 " 93.3 63 NORTH OF LOT 110 104' 12.3 108.1 119.0 90.8 WV. 13 64 NORTHWEST OF LOT 20 90' 12.3 109.7 118.0 92.8 65 LOT 25 90' 11.7 111. 1 118.0 94.2 66 LOT 28 92 1 14.3 105.9 115.5. 91.1 67 LOT 21 94' 11. 1 111. 3 118.0 94.5 68 EAST OF LOT 24 92' 12.3 110.0 118.0 93.2 69 LOT 17 78'. 8.1 101 .3 . 115.5 87.7 70 Lor 26 92' 9.9 104.5 115~ 5 90.6 71 61 WEST OF LOT 93 106' 8.1 108.2 119'.0 91.1 72 69 LOT 15 78 1 10.5 107.2 115.5 92.8 73 WEST OF LOT 98 106' 10.5 115.0 125.5 91.6 74 NORTHEAST OF LOT 14 82' 8.1 107.6 115.3 93.0 75 NORTHEAST OF LOT 14 84' 9.3 107.2 118.0 91.0 .OV. 14 76 LOT 20 94' 8.7 118.5 1.21.5 97.6 77 LOT 8 96' 11. 1 114.1 121.5 94.1 78 NORTHWEST OF LOT 11 94' 9.3 115.7 1'21.5 94.9 79 NORTH OF LOT 4 BO' 9.3 118.0 '121. 5 96.8 80 NORTH O~ LOT 4 84' 10.5 108.'9 117'.0 93.0 ~ J WOODWARD· GIZIENSKI & ASSOCIATES 1 CONSULTING lOlL ANO rOUNOAlION l'NIIINUft5 AND Q(OLOGIS15, ~ erOMPACTION TEST RJ:!SUL.; CARLSBAD PALISADES UNIT #1 . DATE REPORTED December 13, i 1971 I JOII NUMBER 73-130 OATES COVERED Oct~ber 31 through December 11, 1974 PAGE 3 OF 6 MOI.TUIt& YIELD LABORATORY ItELATIVE DATI: naT Ila:TEII'r LOCATION ELEVATION CONTENT PENS,lTY DENalTY CON';ACTION NUNSEII 01' OF TEST 11. DIIYWT. PCI' PCI' '4 01' LAC. Du.:a. NOV. 11 81 SOUTHEAST OF LOT 27 96' 10.5. 108.0 117.0 92.2 82 LOT 23 ' 96' 9.9 104.0 118.0 88.2 83 SOUTH OF LOT 21 98' 13.6 116.7 121. 5 95.~ 84 LOT 4 86' 10.5 108.0 118.0 91.4 85 WEST OF LOT 4 88' 9.9 110.0 118.0 93.2 86 LOT 3 90' 13.0 111.3 121. S 91.8 87 LOT 16 92' 14.3 113.3 121.S 93,~ 1 NOV. 15 88 LOT 29 94 ' 16.3 109.2 121.5· 90.0 89 EAST OF LOT 17 94' . 11.1 112.9 121.S 92.5 90 LOT 17 96 ' 13.6 113.1 127.0 89.2 91 82 LOT 23 96' 9.9 107.2 118.0 91.1 92 90. LOT 17 96' 13.6 115. 1 127.0 90.8 93 LOT 100 108' 8. 1 10S.7 119.0 88.8 94 LOT 92 108' 9.9 108.1 119.0 91.0 NOV .• 18 95 LOT 6 '95' 3. 1 119.2 127.0 93.8 96 LOT 11 98' 8.7 118.9 127.0 93.6 97 LOT 16 99' 8.7 119.3 127.0 93 •. 9 98 SOUTH OF LOT 103 110' 9.9 ' 109. 1 119.0 91.6 99 LOT 98 112' 11.1 115.6 127.0 91.0 100 LOI 92 108' 8.7 . 107.3 119.0 90.1 NOV. 19 101 LOT 104 114' 9.9 122.8 125.S 97.8 102 LOT 87 114' 8.7 123.2 125.5 98. 1 103 LOT 99 116' 11. 1 113.9 119.0 95.7 104 LOT 12 99' 12.3 119.3 127.0 93.9 lOS LOT 6 96' 12.3 118.5 127.0 93.3- NOV. 20 106 LOT 5 FG 97.7' 13.6 114.9 127.0 90.4 107 LOT 8 FG 98.7' 14.3 . 121 . .0 127.0 9S~2 108 LOT 11 FG 100.9' 14.3 115.0 127 .. 0 90.5 109 LOT 16 FG 102.2' 13.6 119.0 127.0 93.7 110 LOT 77 116' 7.5 110.1 118.0 93.3 111 LOT 105 118' 12.3 110.4 117.0 94.3 112 LOT 109 118' 11.1 106.1 117.0 90.6 ~OV. 21 113 LOT 190 118' 9.9 105~9 117.0 90.5 114 LOT 107 120' 11. 1 106.3 117.0 . 90.8 115 LOT 87 120' 11. 1 105.8 117.0 90.4 116 LOT 103 122' 12.3 106.1 117.0 90.6 WOODWARD· GrZIENSKJ & ASSOCIATES. CONSULTING SOIL ANO rOUNO ... TlON [NGIN[(It\ ... NO G(Ol()(lISl' \I',.' ,', ' rfil~7~~~ ;P' JOB NAME .OMPACTION TEST RESUL.~ CARLSBAD PALISADES UNIT #1 " JOB NUMBER 73-130 DATES COVERED October 31 through December 11, 1974 DATE nST NUMSE" NOV. 22 117 118 119 '20 121 \ ' RETEST 01' . ' LOCATION NORTH OF LOT 106 NORTH OF LOT '01 LOT 114 NORTH OF LOT 104 SOUTH OF LOT 105 ~O'STURE ELEVATION CONTENT OF TEST ~ DIIY WT. 1241 124' 1241 124' 124' 14.3 16.9 13.6 15.6 14.3 DATE REPORTED December 13, 1974 PAGf; 4 OF 6 'IEL.P 'U,IS0RATClIIY , III:LATlV~ DENSITY DENSITY COIol,. ... CTIOH PC" J.cl' ~ 0, LAB. D£><a. 109.4 111.0 93.5 112.4 117.0 96.0 117.0 117.0 100.8 111." 117.0 94.9 111. 7 117.0 95.4 WOODWARD· GfZIENSK:1 & ASSOCIATES CONSULTINC SOIL "NO rOUHD"lIDH (HCIHU"S ""0 C(OLoGl$!S ': 'M.~";fil!J!/Wf'7" .COMPACTION TEST RESUL,. ,?' ~". DATI: REPORTED December 13, 197 CARLSBAD PALISADES UNIT 1 " JOB NUMBER 73-130 DATU COYE~EO October 31 throu"gh December 11, 1974 . PAGE 5 0,-: {5 MOISTu,"e VIIELD LA.ORATORY 'RIELATIVIE DATI nST RETCST LOCATION ELI!;YATION CONTINT OIENSITY . OIENSITY COMi>ACTION NUN.EII 01' OF TEST 'II. DIIYWT. reI' KI' % ~I' LAB. DVIS. NOV. "2·5 122 LOT 119 126 1 11.7 111.1 120.0 92.5 123 LOT 8.9 126 1 12.3 109.8 118.0 93.0 NOV. 26 124 LOT 97 128 1 12.3 110.2 117."0 94.1 NOV. 27 125 LOT 93 128 1 11.7 119.5 127.0' 94.0 126 LOT 106 130 I 12.3 1.21.3 127.0 95.5 127 LOT 95 130 I 12.3 111.7 118.0 95.4 DEC. 2 128 EAST OF LOT 46 101' l1.7 106.7 118.0 90.4 129 LOT 101 132 1 12.3 108.2 120.0 90.6 130 LOT 112 132 I 14.3 105.2 115.5 91.0 131 LOT 95 132' 11. 7 107.2 117.0 9l.6 DEC. 3 132 LOT 32 105 1 11.7 114.9 127.0 90.,4 133 EAST OF LOT 39 96 1 15.6 110.8 120.0 92.3 134 " II LOT 38 98' 13.6 115.3 121.5 94 . .8 135 II II LOT 38 laO' 12.3 116.0 121.5 95.4 WOODWARD· GIZIENSKI & ASSOCIATES CONSULTING SOIl. AND rOUNOATlOH INGIN£lIlS .... 0 G£OLOfOISlS ~'>~~" , . .. ..... • ,J." __ .. ~, ... h .... ~~_~ ......... I~' _ .. ~ ___ ' _ ~ ... ,-__ ""iSl. b.adW?*'f A''iilJl."b');rh;H ...................... , " , .' - '. / 'O~PACTION TEST RESUL" / " F ~ , • .r- 'vv JOII NAME CARLSBAD PALISADES UNIT 1 DATE RItJtORTEO 12/13/74 . \ JOB NUMBER 73-130 (FILL) DATE. COVERED October 31 through December 11, 1974 PAGE 6 0 .. 6 MOIiTUlut .. IELD L.A. ORATORY RI:L.ATIVI: DATI: 'naT IIeTeST LOCATION I:LEVATION CONTENT OltNSITY DltNSITY COMPACTION ·NUMSltll 0 .. orrTlI;sT "I(,OIlY-WT. PC;!' PC, % 0,. LAB. DItHS, )EC. 6 136 £0 OF LOT 38 102 1 13.0 113.9 120.0 94.9 137 NE. OF LOT 105 134' 15.6 108 .. 3 115.5 93.7 138 NE. OF LOT 102 134' 13.6 '114.2 121.5 9.3.9 139 N. OF LOT 99 134' 13.0 112.8 118.0 . 95.5 140 £0 OF LOT 45 104' 13.0 111. 9 118.0 94.8 141 E. OF LOT 39 106' 13.6 112.9 120.0 94.0 142 £0 OF LOT 47 108' 13.0 111. 7 11-8.0 94.6 143 E. OF LOT 38 110' 13,.6 112.0 118.0 94.9 DEC. 9 144 NE. OF LOT 93 120' 10.5 102.2 118.5 91.3 145 LOT 86 120' 14.3 114.9 127.0 90.4 146 LOT 92 120' 14.3 115.3 127.0 90.7 147 LOT 32 102' 12.3 109.2 118.0 92.5 DEC. 10 148 LOT 21 101' 8.7 115.1 127.0 90.6 149 £0 OF LOT 46 112' 13.0 113.6 121.5 93.4 150 £oOF LOT 47 116' 12.3 112.7 121. 5 92.7 151 LOT 27 89' 11.7 114.6 127.0 90.2 152 LOT 22 101' 12.3 115.0 127.0 90.5 DEC. 11 153 LOT 25 99' 13.0 117.8 127.0 92.7 154 LOT 31 97' 11.1 116.5 127.0 91.7 155 LOT 3 97' 9.9 118.3 127.0 93.1 156 LOT 18 FG'102.4' 13.6 114.8 127.0 90.3 157 LOT 24 FG 102.0 1 12.3 114.6 127.0 90.2 158 LOT 32 104' 13.0 115.2 127.0 90.7 159 LOT 26 FG 100.3 12.3 109.0 120.0 90.8 160 LOT 29 FG 98.7 13.6 116.7 127.0 91.8 161 LOt 1 FG 98.7 12.3 109.3 120.0 91.0 162 LOT 28 FG 99.3 13.6 115.5 127.0 90.9 WOODWARD· GIZIENSKI & ASSOCIATES CONSULT'NG ~o,~ AND rOUNDAlION IN''INnlt~ AND Q£OLOlllsn JOB NUMBER eCOMPAc-:rON TE$T RE~UL_ CARLSBAD PALISADES UNIT 1 73-130 (STREETS) O ... nREI"ORTltD December 13, 1"97 OATES COVERED November 21 through November 27, 1974, ,. ... GE 1 01" 1 MOIITUIIK I'IELD LAilOIllATOIIY ftl:LATIYIt PATE ftST RItTEST LOCATION ELEVATION CONTENT DEH.,Tl-DEH.,TY COMPACTION HUM.EII Or' Ol'TEST 11. DItYWT. pel' PC7 "4 0 .. LAB. DItH •• PALISADES DRIVE STATION NOV. 21 $-1 4+15 N. HALF 120' 14.3 1:08.0 117.0 92.3 NOV. 25 ~-2 4+24 CENTER 122' n.l 114.9 ·127.0 90.4 NOV. 26 $-3 3+82 N.· HALF 126 1 11.7 106.1 117.0 90.6 NOV. 27 S-4 5+15 N. HALF 130.1 12.3 117 .2 127.0 92.2 • WOODWARD· GIZIENSKI & ASSOCIATES CONSULTING lOlL AND fOUNDATION lNGINElII' A"D Q[OLOGISTS I~ 130 120 110 100 90 FC • . DIRECT ~EAR TEST DATA 1 2 3 Dry Dens i ty. pet 106.7 -- Initial Water Content. % 12.7 -- Final Water Content. ~ 17.2 -- Apparent Cohesion. psf 240 -- Apparent Friction Angle. 0 28 .-- • ' ~CHAHICAl AHAl.YSIS 3 I ~ 10 ~ 200 100 ~ ~ \ ,\-f. -2 \ \ 1-~ ''- i ~ '-'-- r--.:. 1--..... ~l I. /1 , ~ I ~l I ,I· I 1 1 I I .1 ,I ,..;;;; I 0 0 I 0 01 0 001 II o 1000 100 10 \ [\ . . . WZERO AIR VOIDS CURVES GRAIN SIZE IN MILLIMETERS \ \.- ~ \ ICOBBLESI g~AJ:f I c I~~~ , ISILT & CLAY 'I i\ r\ V2.70 S.G. \ PLASTICllY CHARACTERISTICS \ Dr' 2.60 S. G. ' 1 !\! V'" 2.50 S. G. Liquid Limit. " -~ . i.A ~, 1\ Plasticity Index. r. NP :-;/ \\ 3 f-Classi fication by Uni fied Soi I 2 f--hi \ i\ 1\ Classification System SM I ./. ~~ \ ... 1 V ~ ,\ 1\ <J /./ ~\ " \ 0.. ~ ~ t\ "-SWELL TEST DATA a5 1\ " \ ~ \ 1\ 1\ I.ndial Dry Density. pet l- x 1\ \ Initial Water Content. :;, , :::t. >-\ \ ~ Of: ' Load. psf Q [\ 1\\ Percen t Swe II , ',\ 1\ \ ~ ~ .. \. \ SAMPLE LOCATION \ \ \ ,\. ~1 1 Pad 94 MAXIMUtoI DRY 1 2 3 ~ 2 Pad 120 DEHS ITY. pcf 119.0 127.0 125.5 ~~ 3 Pad 96 OPTI~ MOISTURE r\. ~ CONTENT. ~ 12.5 10.0 10.0 r\. i\..r\. r\.'" ~ MOISTURE CONTENT -;. ,r--.... ""1 .. 10 20 30 LAOORA TORY C(M> ACT I a. TEST LABORATORY COMPACTION TEST Io4ETHOD: ASTM -D 1557-70 A FilL SUITABILITY TESTS CARLSBAD PALISADES UNIT NO. 1 2 36 21 SC WOODWARD -61· Z I HJSK i & ASSOC 1 ATES 3 .. 29 12 SC .. , CONSULTING SOIL AND FQUKOAHON ENGINEERS AND GEOLOGISTS SAN DI'E(~. CALIFORNIA , GS PROJ. NO: 73-130 I I I . I ~ t I I j , i ; OR~ BY: I StALE: --: - CK'D BY: In TE; 12/13/74 PAGE 1, of '/1../ .' .' 130 120 110 100 90 tEOiANI ~ AHA!. YSI S 'DIRECT $HEAR TEST DATA Dry Densi ty, pcf ,100 3 • .. 10 ..0 200 ·80 \~ £1.' ~: ''t\ , h Initial Water Content. % Final Water Content. % Apparent Cohesion. psf \\ . , 5--' k\'. \\ r-.... ~ ........ en ~ 60 A- I- ffillO <.,) oc. , Apparent Friction Angle. 0 ........ .......: ""-'. ' ~ w 0..20 o t .1 1. i I I, I I 1000 100 10 I 0 0 I 0 01 0 001 1\ . . . . VZERO A I'R VO I OS CURVES ,GRAIN SIZE 1M HI LLIMETERS \.. (COBBLESI G~ArE~ ,I c; ~AHr f 'Is I LTtr CLA~ ~ \ \ , \ \ V2.70 S.G. PLASTICITY CHARACTERISTICS ~2.60 S.G. 4 5 6. '\., 2.50 5.G. L i qU i d Li mit. 1-33 34 37 '\.---, \ 1\' Plasticity Index.'!. l5 11 20 \ 1\ Classification by Unified. Soil fA-~ ~ Classification System SC SC SC J 1\" ~\ '--~ ~ V .' f-\ 1,\ 1\ .... 'II 1/ 1\\ \ u ~ I-5 !--= ~ .I , 1\ 1\ SWELL TEST DATA 4 5 6 a v ~ \ ~ 6 f--; hi \ 1\ 1\ Initial Dry Density. pef -' 105.7: -,I- \ x 1\ Initial Water Content .. ~ -' 12.1 -::> >-\ '\ f\ Load. psf 160 "" Q [\ ~\ - - Percent Swell 3.9' , \ l\ -- '\ ~ 1\ 1\ \ SAMPLE LOCATION , \ 1\ l\ ~~ 4 Pad 15 . J.4AXIMUM DRY 4 5 6 '\ 5 Pad 53J.. Lot '2 DENS ITY, pcf 121.0 118.0 117.0 ~~ 6 Pad 22 , OPTIMUM MOISTURE \.~ C(»tTENT. % 11.5 12.0 12.5 '\. '\. ~ " [\.~ MO I STURE CONTENT, 'f. f'\.~) 10 20 LAOORATORY C{M> ACT I (J4 LABORATORY COMPACTION TEST wrnoo: ASTM-D 1557-70 A 30 FILL SUITABILIlY TESTS, CARLSBAD 'PALISADES UNIT NO. 1 ~DWARD - G I Z I rnSK I & ASSOC I ATES , ...- 1'10 130 110 100 90 DIRECT SHEAR TEST DATA Dry Densi ty, pet Initial Water Content, % Final Water Content. 1- Apparent Cohesion. psf Apparent Friction Angle. 0 \ 1\ r ~ ~ZERO AIR VOIDS CURVES ~ \ .\ \ \ V2.70 S.G. \[\/2.60 S. G. \ '0. 2.50 S.G. ~ \ K\ .I \ \~ 9 ). ",\,1 ~ .' V :\, , ~\\ !A ~ V \ !~'I\ ~ ~ ~~ u V Q. 7 ~ /" \ I~I\ I-.~ i§ , ~ ~ \ i\ t'\ l- x 1\ \ :::> >-\ \ f\ cr: Q 1\ \ r\ '\ f\ '\ 1\ f\ f\ .\ \\ I\, MAXIMUM DRY 7 8 f\ 100 80 C!J x U) ~ 60 c... I-ffi'lO (,.) cc. W c... 20 o I t.£CH~ I CAL ANAl YS I S 3 a q 10 '10 200 -~, .1\ l\\ ~~.~ ~r !:J-'l ~\ \\ "-.~." t-... '"0:::: ::..: ~ 't5 . I I I I I. I I 1000 100 10 I 0 0 I 0 01 0 001 ' . GRAIN S'IZE III MILLIMETERS ICOBBLESIGRAVEL I . SANf ' ,ISILT& CLAY] elfclm f, PLAST I CITY CHARACTER 1St I CS 7 8 9 Liquid Limit, r. 34 -36 Plasticity Index. r. 15 -20 Classification by Unified Soil Classification System CL SC SC SWELL TEST DATA 9 9A Ini\ial Dry Density, pef 116. 1 115.0 , Initial Water Content. % 11.4 13.6 Load. psf '160 '~ 160 Percent Swell 3.2 0.8 SAMPLE LOCArlON ~.\. 7 . Section A-A, Station 488+50 9 ~ 8 Pad 1 DENSI TY. pcf 115.5 121. 5 127.0 ~~ 9 Tamarack Ave, Station 2+00' ' OPT I MUM HO i STURE CONTENT,'!. 15,0 13.0 MO I STURE CONTENT. '/. 10 20 LAOORATORY C()PACTIOH LABORATORY COMPACTION TEST METHOD: ASTM.,.D 70 A 11.0 30 \.~ '~ ,,, ,-' t\.'" ~~) '10 FILL SlHTABILIlY TESTS CARLSBAD PALISADES UNIT NO. 1 WOODWARD -GI Z I ENSK I & ASSOC I A . h._ ' , .... , --------vl ... • tE<AiAH I CAL AHAL YS I S ,,: . t, ,- '-' 3 I " 10 160 200 , -100 DIRECT SHEAR TEST DATA 10 11 12 ~~ t\ \ \ \ 107.7 106.5 80 Dr)' Density, pcf _ -Cl' \ . !: , Initial Water 'Content. % -13. 1 13.0 CI) \ ~ f-12 :i 60 16.2 18.0 c.. 11\ \ Final Water Content, .,. -I-y~ ffilIO Apparent Cohesion. psf -240 420 u I _ -:-oJ ~\{ 0:. W \ ...... 10 0 a.. Apparent Friction Angle. -28 25 20 "-,:'-.-f;;::;::: I -l I 11 I I I I r-~''::: 0 1110 1000 100 10 1.0 0.1 0.01 0.001 \ 1\ ~ZERO AIR VOIDS CURVES GRAIN SIZE 1M MILLIMETERS \.- (COBBLESI G~Ar~' I c I ~~ lSILT & CLAY:) ~ \ ~ \ !\ ' ~2.70 S.G. \ , 130 PLASTICITY CHARACTERISTICS \ [\/2.60 S.G. 10 11 12 LX-V""" 2. SO, S. G. Liquid Limit, 10 28 --~ J '\ 1\ Plasticity Index. r. 11 NP NP ~G V ~\ ~ 1\ Classification by Unified Soil 120 I \ \ ~ Classi fication System SC SM SM II 1-", r r\'~ \ 1 1/ '\ ~ , r\ .... I\-~ \ u /' a. I-'h . \ ~~ 1\ ~ . ,\, \ SWELL TEST DATA 10 11 12 '-110 ~ \ 1\ 1\ Initial Dry Density. pcf 115.2 --l- X 1\ \ Initial Water Content. :Z _ 9.1 --' ::;) > \ \ 1\ lit: Load. psf 160 -c:o f\ 1\ " - Percent Swell \ \ 1\ 1.3 --100 \ \ , \ \ SAMPLE LOCATION \ \ \ \ \\ 10 Tamarack Station 14 90 t.tAXIf.U4 DRY 'lo 11 12 1\ 11 Lot 58 DEHSI TY. pet 127.0 120.0 118.5 ~~~ 12 Lot 59 OPT I J.IJM MO I STURE . 9.5 12.5 13.0 COMTENT. % ~l\.~ I " '\.~ 8°0 MOISTURE CONTENT '/. ~hl, 10 20 30 LjQ. ~OORATORY CCWACTI()4 TEIT. FILL SUITABILITY TESTS LABORATORY COMPACTION CARLSBAD PALISADES TEST MrntOD: ASTM-O "557-70 A UN1T NO. 1 hOODWARD -GIZIENSKI & i\~Sflt I ATES COItSULTlHG SOIL AND FOUHOAHOH EHGIHEERS AND GEOLOGISTS SAM DlfGO. CALIFORNIA DR. BY: GS I SCALE: IPROJ. NO: 73-.30 CK'D BY I DATE: 12/l3/74 !PAGE 40f 4 ~ :c •• • WOODWARD· GIZIENSKI & ASSOCIATES 3467 Kurtz Street San Diego California 92110 (714) 224-2911 " CONSULTING SOIL AND FO.UNDATION ENGINEERS AND GEOLOGISTS An affiliate of Woodward -Clyde Consultants October 1, 1973 Project No. 73-13b Revised: October 26, 1973 Douglass Pacific Southwest Corporation Post Office Box 38 . Oceanside, California 92054 Attention: Mr. Frederick K. Musser RECOMMENDATIONS FOR BUTTRESSING OF SLOPES AND FILL FOUNDATION TREATNENTS CARLSBAD PALISADES CARLSBAD, CALIFORNIA In accordance with the request of Mr. Dick Slayter of Rick Engineering Company, we have made additional slope stab-;lity analyses of the subject site". These analyses are based 011 a revie\;t of the latest grading plan provided us by Rick Engineedng Company on September 19, 1973. A pre- "liminary investigCl.tion of the site was made by our .firm and the results presented in a report dated March 3, 1973. An addendum letter concerning additional soil studies of the site including a.dditlonal borings-and laboratory tests is d-atedf'1ay16, 1973. The data in these soil reports provide the basis for our slope analyses. The recent grading plan provided us indicates the followin~ cut and fill slope configurations: Type of Slope Approximate Inclination* Approximate Maxjmum Height Cut 1-1/2 to 1 74 tt Fi 11 1-1/2 to 1 60 ft Cut-Fill 1-1/2 to 1 67 ft (predominantly cut) Cut-Fill 1-1/2 to 1 73 ft (predominantly fill) * In slopes over 50 feet in height a bench is ~rovided at approximate mid-height. u, Douglass paCific,6h"est Project No. 73-130 October 1, 1973 Revised: October 26, 1913 Corporation • Page 2 ---.~> Our studies included the establishment of soil parameters for use in slope stability analyses; these parameters are based on laboratory tests contained in the preliminary report, additional labora.tory tests (including, slow direct shear tests performed under saturated conditions) and our experience with similar soils in" adjacent areas. Based on our analyses, we have arrived at revised general slope criteria for the subject site. The criter"ia. is based on a minimum factor of safety against deep-seated slope failure of 1.5 under static cQnditions. The follow- ing table presents these criteria: Slope Cut Cut Fill Fi 11 Materiai Sandstone Claystone Compacted fill of any suitable on- site soil Compacted Sandstone • I Ha= allowable slope height for 1-1/2 to 1 inclination 76 ~ft ,0 ~ft 30 ft qO ft * * NOTE: Compacted fi 11 slopes over 60 feet in he"i ght shaul d h"ave the outer "50 feet compacted to an average relati ve compaction of 93 pel~Cel1t with a minimun) compaction of 91 percent. As an alterna'te, the slope should be reduced to 2 to 1 inc1inatton. Several of the proposed slopes~ according to the most recent grading plan fal1 outside of the criteria listed above. In addition, several of the cut- fill slopes in our opinion that fall vJithin the height limitations~ do not have adequate safety factors against slope failure. These slopes are shmvn ' on the attached Site Pl an, and recommendati ons for fi 11 foundation" treatment and/or buttressing are presented below: Cut Slopes Composed of Claystone over ~)O feet in Overall Height It is recommended that this entire cut slope be 9uttresse<i. with compacted sandstone in accordance with the following sketch. Compacted Sandstone .L ---=:'-¥ .3' Min imuro T ,'.' Slope ~Claystone~ Drain System as required" To be determined in field during conslr~ction" to ath'ieve adequate WOODWARD· GIZIENSKI & ASSOCIATES CONSULTING SOIL AND rOUNOATlor. ENGINEERS A",O-Q£OLOG.515 T 0' l060' Dougl ass Paci fi c ~.IVJest Corpol~at'i 0n rroject No. 73-130 ,. October 1, 1973 Revised: October 26, 1973 Page 3 ;510Res Composed 'of Compacted Fill over 30 feet ~nd 1 ess than 60. feet in Overall Heig,ht. It is recommended that all fill slopes greater than 30 feet in height be constructed in accordance \\fith the follo\lJing typical sketch: ~_-'---'-'_-"'-o ........ ...,....,.. __ l 30" Min" ~30'to60' Sandstone , ~' (soc note page 2) , I ' , ". " .-;':~;;Jj{/., · ~iH"~!le~iai;te com, acted _.-L_-7;L~xcavate aod ',ccom,acted 3' HI n(,1----:...:::::~-,.;.::>-.c .../ If claystone 1 n key ;. ~ Remove all overburden ' ~ -from ke¥ area for insp.ection . Cut-Fill Slopes with Claysto~e in Cut Portion It is recommended that special treatment be employed in the cut portion of these slopes in accordance with the fo 11 ovli ng sketch: Compacted Sand stone i----~·:-;-7~~'~~~~~ I~_:" ~v; ,~: __ ~:l',"'::: 1, ].IJ~ :.;..: , :.~,.·i:· ~Suitable on site compacted ", --.~"'," fill materi aJ , . ( eo note page 2) _1 ~ _______ }-requi red· 3' J.(i n,,-:----1.:.r It is generally recommended that the natural overburden soils be benched through and into formational soils as the fill progresses up slope. In many cases, the ~tability nf claystone slopes will depend on the actual geologic conditions exposed in the slope. Criteria to be considered include intense fracturing, jointing or faulting, weakclayseams within the claystone, bedding atdtudes and water seeps. These criteria can best be evaluated by a geologic examination of the cuts during grading. Some of the lower cut slopes, falling within our criteria above, may have to be buttressed depending ~n the presence or absence of the adverse geologic features. WOODWARD· GHI.ENSKl&ASSOCIATES CONSUL TINa SOIL AHO FOUNOIITIOH ENGINEERS AND GEOLOGISTS Doug 1 as s Pac ifi c S.1I'lCS t Project No. 73-130 October 1, 1973 Revised: October 26, 1973 .. , .. ~~ . Corporation '. .In re.gard to landscaping the slopes, whether a particular species ,of vegetation would be more suitable than another, can be best determined by the landscape architect. It is recommended, however, that controls be placed on irrigating the slope such that excessive wetting of the slope does not occur that would cause saturation of the outer portions of the .slope and possible ,subsequent sloughing. Cal~eful consideration should be given to the design of the irrigation system such that the possibility of leakage and breakage of water lines are minimized. It is recommended that the lots above slopes be properly drained and/ol" bermed as required and that no ponding of water occur in the pad near the rear slope. It is recommended that final grading plans be reviewed by our office prior to final .submittal. If there ai~e any questions concerning our recommendations' above or any other part of the project, please call or write at your COlweni ence. ' WOODWARD-GIZIENSKI & ASSOCIATES d~/~-. L011is J. L~~E. 14129 LlL/RPH/mf <, (4) Dougl ass Paci fi c Southwest Corporati.on Attention: Fred~rick Musser (2) Rick Engineering Company Attention: Dale Gleed Attachment WOODWARD· GIZIENSIO & ASSOCIAtES CONSUL liNG SOIL AND fOUNDATION ENGIN£[IIS' AHD GEOLOGISTS / . WOODWARD· GIZIENSKI & ASSOCIATES, ~ONSULTING SOIL AND FOUNDATION ENGINEERS AND GEOLOGISTS An affiliate of Woodward -Clyde Consultants 3467"Kurtz 'Street San Diego California 92110 (714) 224·2911 August 8, 1973 Project No. 73-130 Douglas Pacific Corporation P.O. Box 1207 San Clemente, California 92672 Attention: Mr., Jerry Johnston SLOPE BENCHES CARLSBAD PALISADES CARLS BAD, CAL I FO RN lA, In accordance w'ith the request' of Mr., Dick Slater of Rick Engineering Company, we have made a study b,f the use of benches in proposed slopes for the subject subdivision. The proposed cut and fill slopes have maximum heights 6n the' order of approximatel'y 65 feet, accord,ing to the latest preliminary ,grading plan prepared by Rick Engineering Company. Our study is based on information contained in a preliminary soil investigation for the site presented in a report dated March 3, 1973, an addendum letter concerning additional soil studies at the site, dat~d May 16, 1973, and our general experience in the field of soil engineering for land development projects in the area. Slope stability problems can be divided into three main 'areas. The first area is surface sloughing, which is caused when loose surface sOi,15 become saturated due to excessive irrigation runoff or heavy rain, loose strength and slide down the slope. The second area is erosion gullying, which results from the coalescing of rain runoff or sprinkler-water which results in small streams of water running down the slope, which erode channels. Deep-seated slope failure is a function of the slope geometry, geologic factors and soil strength perameters. . The effects of benches in each of the above areas of concern are as follows: Surface Sloughing " Benches catch sloughed soil and help keep material off the lot pads, walkways an'd roadways below slopes. However, benches can become, plugged with sloughed material and cause ponding of water. Subsequent infiltration of the ponded water into the slope can aqgravate the condition of sloughin~ and effect deep-seated slope stability. Surface sloughing can generally be minimized by good compaction of the slopes, planting and carefully con- trolled irrigation. Douglas pacifi1-··poration Project No. 73-I ,o,ugust 8,1973 . f' . Page 2, , 'Eros i on' Gu 11.1'; og BEmche's in the slope reduce the distance that water travels on' slopes and thereby limits the tributary area and hence the formation of the gulli.es. Here, as in surface sloughing this condition can be controlled by planting and adequate compaction. Also, cohesive soils may be used on the slopes, as a cap over granular soils to resist erosion. Small diameter rip-rap, gunite, and soil cement can protect exposed slopes from erosion. 'Deep-seated 'Failure Slope benches reduced the overall inclination of a slope, thereby increasing the calculated factor of s51fety. In general, however, tbe reduction is only significant~in slopes ,over 75 feet in height. Buttresses of $elected soils can be used to increase the factor of safety of a given slope without reducing the inclination. ' Soils of the subject site, in general, range from silty and c'layey sands to clay-siltstones materials. Gullying in these materia1s, either compacted slopes or natural cut slopes, is generally less of a problem than with clean granular and gr~velly soils., It is concluded, based on the discusston above that benches in slopes at the subject site are not generally required for deep-seated stability. It is also evident that other procedures ,may be followed which would serve the same purpose as benches, such as careful compaction of the slopes, planting and careful irrigation control. It is recommended, however, that some kind of minimum control for slopes between hei.ghts of 50 and 75 feet, say one bench midway in the s.1ope, be provided in order 'to help minimize erosion gullies and sloughing. ' If there are any questions concerning this matter, please call or write at your convenience'. He are currently reviewing the most recent grading plans provided by Rick Engineering Company, 'in particular .in regard to the proposed' cut and fill slopes and are preparing recommendations for buttressing where required. These recommendations will be presented in a few days. WOODWARD-GIZIENSKI & ASSOCIATES d~/.,~~&~· J~ts E. Cavallin, R.E. 17553 RP\t1/ J EC/mb (4) Douglas Pacific Corp. (2) Rick Engineering Co. (l) Doug'las Pacific Corp., Attn: f1r. Joaquin Garcia WOODWARD· GIZIENSKI & ASSOCIATES CONSULTING SOIL AND FOUNOATION £N"'N((!!S ,foND .. EOLO .. ,STS , . ~