HomeMy WebLinkAboutCT 74-21; El Fuerte Business Park I Lot 14; Soils Report; 1989-08-26- - APPLIED OE~TE~HNICAL ENOINEE~WO, INC. - - - .- - - - - - - - I r August 26, 1989 P,roject No. 87-l 68A Prime Contractors 4501 East La Palma, Suite 200 Anaheim, California 92807-I 907 Attention: Steve I Subject: Business Park I e Street and Loker Avenue Reference: Engineering, Incorporated Road and El Fuerte Street Gentlemen: This report is being submitted the conclusion of contains a summarization grading activities observation services by our firm development. grading operations. It and the associated for the commercial fNGlN$RlNG tiEPi. LIBRAfly 1 .o pRaF(?,T DNEl C#,~FN city of Cadsbad 21375 Las PiMas Drive 1 .I bcatioo Carkbad, CA 9NO9-4859 The project site is I cated on Lot 14, at the northwest corner of El Fuerte Street a R d Loker Avenue in the City of Carlsbad. 14661-C Myford Road . Tustm, CA 92680 . (714) 669-8081 I 7 r I-- r- - - - - .- - - -. - _- August 26, 1989 Project No. 87-168A Page Two 1.2 Jmorovements Site improvements consisted of several concrete tilt-up structures. 2.0 PRCWCT GRADI& reliminarv Site Investiaatipl! P An evaluation of the site was performed by our firm in August 1987. Results of the investigation were presented in our Soil and Foundation Investigation Report, Project No. 87-l 68, dated August 13, 1987 . 2.1 2.2 Site Grading Site grading consisted of the excavation and recompaction of the upper 1 to 3 feet of the on-site soil. Gradina Period Grading operations commenced on May, 1988. Our final inspection of the utility .backfill was on March 27, 1989. 3.0 GRADING ORSFRVATION 3.1 Jurisdiction Grading activities for the development were under jurisdiction of the City of Carlsbad. APPLIED GEOTECHNICAL ENGINEERING. INC. - 7 7 - - - - - - - - - - - - - - - August 26, 1989 Project No. 87-168A Page Three 3.2 j?ailv Reoort of Gradina Observation and Testing A field observation work sheet was prepared by our Soils Technician for each observed day of grading activity and was reviewed by our supervising Soils Engineer. 3.3 3.4 Yerification We concur that earthwork construction performed under our observation was performed in accordance with the project specifications, the Soils Engineer’s recommendations, and the City Excavation and Grading Code. Field Testina Procedures Test Methods - Field density tests were performed with a 6-inch sand cone in accordance with the procedures outlined in A.S.T.M. Test Method D1556, and the Nuclear Test (A.S.T.M. D2922 and D3017). Number of Tests - The results of the 166 field density tests performed during this phase of grading are presented in the “Summary of Field Density Tests.” Field testing was used to determine the degree of compaction as fill materials were being compacted. ) ocation of Field Tests - The approximate location of each field density test is identified on the “Density Test Location Plan,“, Figure No. 1. APPLIED GEOTECHNICAL ENGINEERING. INC. - - - - - - - - - - - - - - - - - - - August 26, 1989 Project No. 87-168A Page Four 3.5 l.&Qratorv Testino Procedures Compaction Characteristics - Soil samples obtained from the field were visually identified. The procedures outlined in A.S.T.M. Test Method D1557-78 were used to determine the compaction characteristics of the fill materials. The results of the laboratory compaction ,tests are presented below: LABORATORY COMPACRON TEST RESULTS Maximum Optimum Soil Sail Dry Density Moisture Content Descriotion fwcu. ft.1 IPercent A Silty SAND 1165 12.5 B Sandy CLAY 116.0 16.1 C Silty SAND 120.0 12.0 D Silty SAND 122.0 11.5 E Rock Base 140.0 5.0 4.0 PROJFCT IMPROVFMENT 4.1 Utilities The utility trench backfills were probed and tested to verify compaction. The backfill material consisted of the excavated on-site soil and mechanically compacted. , APPLIED GEOTECHNICAL ENGINEERING. INC. - - - - - - - - - - -- - - - - - - - - August 26, 1989 Proiect No. 87-168A Page Five 4.2 4.3 The probing and testing indicated that the trench backfills have been properly compacted and are considered suitable for the intended use. Utility trenches observed consisted of sewer, water, storm drains, electric, and gas. Footina Observation The building pad footing excavations were observed by a representative of our firm. The exposed footing trenches were found to be satisfactory and suitable for the placement of concrete. . mrsh Grading On-site drainage is provided by surface gradients sloping away from the structures to suitable discharge facilities The opportunity to be of service is sincerely appreciated. If you have any questions or if we can be of further service, please call. Very truly yours, APPLIED GEOTECHNICAL ENGINEERING, INCORPORATED /*A Peter C. Yong, G.E., M.S. RGE 919 PCY:jb APPLIED GEOTECHNICAL ENGINEERING, INC. - - - - - - - - - - - - - - -~ - -. - SUMMARY OF FIELD DENSITY TESTS PROJECT: Allen Company Project No: 67-166-l Page 1 Park 1, Lot 14 Data: August 29, 1969 Palomar Airport FM/El Fuerte St. Carlsbad FIELD RELATIVE REFER- DRY WATER cfly CCM- REMARKS TEST DATECF TEST DEPTH axr DENsrrY cx3nm-r DENSfTY PACTiDN la TEST LCCATtCN (FEET) CD!?& (pcf) (sl.) (PC0 W) 1 513166 2 513166 3 513166 4 513166 5 513166 6 513166 7 513166 6 514166 9 614166 10 516166 11 516166 12 516166 13 516166 14 519166 15 519166 16 5l10166 17 5/l 0166 16 5/l 0166 19 5/l 2166 20 5/l 2166 Building 3 - 1 A Building 3 - 1 B Building 5 - 1 B Building 5 - 1 A Building 2 - 1 A Building 2 - 1 A Building 5 - 1 A Building 5 FG A Building 5 F.G A Building 2 0 A Building 2 0 A Building 2 0 B Building 3 - 1 B Building 1 - 1 A Building 1 - 1 A Building 4 - 1 B Building 3 - 1 B Building 5 FSG. B Building 4 - 1 B Building 1 - 1 B l Nuclear Test Method 116.5 22.3 109.7 116 20.6 99.6 116 20.9 104.6 116.5 19.4 101.3 116.5 15.3 110.1 116.5 15.6 112.9 116.5 23 106 116.5 20.5 113.4 116.5 16.9 110 116.5 16.6 112.5 116.5 21.9 106.6 116 21.9 96.9 116 20.6 102.7 116.5 14.3 105.6 116.5 15.9 104.9 116 19.1 97.7 116 16.4 106.6 116 15.7 104.4 116 19.7 104.5 116 16.9 105.3 9 Sand Cone Test Method APPLIED GEOTECHNICAL ENGINEERING. INC. 949 66§ Failed, see #I7 905 67§ Failed, see #7 95§ 97§ 91§ Passed test #4 97§ 94§ 97§ 929 65§ Failed, see #31 6f3§ Failed, see #I7 915 90§ 65’ Failed, see #19 92’ passed test #2, 13 90’ 904 Passed test #I6 915 - - - - - - - - - - - - - - - - - - _- SUMMARY OF FIELD DENSITY TESTS PROJECT: Allen Company Project No: 67-166-l Page 2 Park 1, Lot 14 Date: August 29, 1969 Palomar Airport RdlEl Fuerte St. Carlsbad MAxlfvnJM FIELD RELATIVE REFER- OFN WATER IXf COM AEMARKS TEST DATEOF TEST DEPTH mYi DENSITY CoNrENr DENSRY PACTION fo TEST LOCATION (FEET) CUFiVE 21 5/12/66 Building 1 - 1 A 22 5/12/66 Parking Area F.G B 23 5/12/66 Building 5 F.G. A 24 5/16/66 Building 4 - 1 B 25 5/16/66 Parking Area FG B 26 5/16/66 Parking Area F.G A 27 5/16/66 Parking Area FG. A 26 5/16/66 Building 5 0 B 29 5/16/66 Building 5 0 B 30 5127166 Building 2 S.G. B 31 5127166 Building 2 - 1 B 32 6/l/66 Building 1 S.G. B 33 6lll66 Building 1 S.G. B 34 6lll66 Building 4 S.G. B 35 6lll66 Building 4 S.G. B 36 6lll66 Building 2 S.G. B 37 611166 Building 2 S.G. B 36 6lll66 Building 2 S.G. B 39 6/l/66 Building 3 S.G. B 40 6/l I66 Building 3 S.G. B 9 Sand Cone Test Method (PCf) w (PCf) 116.5 16.3 109.2 116 13.6 113.5 116.5 13.2 107.6 116 16.2 104.4 116 22 106.4 116.5 14.9 109.7 116.5 16.3 109.6 116 14 110.1 116 19.3 106.2 116 15.1 100.6 116 12.7 106.1 116 15.7 107.3 116 16.9 105.3 116 17.4 106.2 116 14.6 106.4 116 16 103.6 116 13.6 106.7 116 14 105.6 116 13.6 106.9 116 16.4 104.7 (“W 949 965 925 90§ 929 949 945 955 w 67§ Failed, see #36 919 Passed test #I2 935 91§ 925 929 90§ 92§ 919 Passed test #30 949 90§ APPLIED GEOTECHNICAL ENGINEERING, INC. - - - - - - - - - - - - - - - - - - SUMMARY OF flELD DENSITY TESTS PROJECT: Allen Company Project No: 67-166-l Page 3 Park 1, Lot 14 Date: August 29, 1969 Palomar Airport RdlEl Fuerte St. Carlsbad FIELD RELATIVE REFER- CFif WATER CRf COM FEMAFIKS TEST DATEOF TEST DEPTHBcEDENsllY CCNTENT DENSKY PACTION fa. TEST LCCATtCN (FEET) CURVE 41 42 43 44 45 46 47 46 49 50 51 52 53 54 55 56 57 56 59 60 612166 Sewer Line - 4 614166 Sewer Trench -5 614166 Sewer Trench -2.5 614166 Sewer Trench -2.5 614166 Sewer Trench -1.5 614166 Sewer Trench -0.5 6117l66 Storm Drain FG 6/17/66 Storm Drain F.G 6/17/66 Storm Drain F.G 6/17/66 Storm Drain F.G 6/17/66 Storm Drain -2 6/17/66 Storm Drain F.G 6/17/66 Storm Drain F.G 6/1~7/66 Sewer Line F.G 6/17/66 Sewer Line -2 6/l 7166 Sewer tine -2 6/l 7166 Sewer Line -4 6/17/66 Sewer Line -2 6/17/66 Sewer Line F.G 9/l 9166 Parking Area - 1 B B B B B B B B B B B B B B B B B B B D (pcf) tw (pcf) W) 116 23.6 92.3 79’ Failed, see #57 116 12.5 109.6 95’ 116 15.6 110.4 95’ 116 13.2 110.7 95’ 116 15.3 112.1 97’ 116 13.4 111.5 96’ 116 12.5 109.6 95’ 116 10.6 112.7 97’ 116 15.5 102.5 66’ Failed, see #50 116 14.6 106.4 93’ Passed test #49 116 9.3 110.5 95’ 116 19 106.1 93’ 116 6.7 105.6 91’ 116 10.7 116.9 100’ 116 15.6 110.4 95’ 116 13.4 111.6 96’ 116 17.6 104.9 90’ Passed test #41 116 13 105.4 91’ 116 13 105.3 91; 122 14.3 110.5 91’ l Nuclear Test Method APPLIED GEOTECHNICAL ENGINEERING, INC. - - - - - - - - - - - - - - - - - - - SUMMARY OF FIELD DENSITY TESTS PROJECT: Allen Company Project No: 67-166-l Page 4 Park 1, Lot 14 Date: August 29, 1969 Palomar Airport RdlEl Fuerte St. Carlsbad MAXIMLM FIELD RELATIVE REFER- CRY WATER Dtf CQM- REMAFIKS TEST DATEOF TEST CEPTH BEE DENSRY CoNlENT DENSRY PACTION lul TEST LCCATlON (FEET) CURVE 61 9119166 Parking Area - 1 62 9/19/66 Parking Area - 1 63 9/19/66 Parking Area - 1 64 10/21/66 Water Trench -1.5 65 1112l66 Water Main - 2 66 1112/66 Water Main - 2 67 1112/66 Water Main -0.5 66 1112/66 Water Main -0.5 69 1 119l66 Storm Drain S.G. 70 1119/66 Water Line S.G. 71 1 Ill 0166 Water Line S.G. 72 1 Ill 0166 Water Line S.G. 73 11110166 Water Line S.G. 74 11/10166 Storm Drain S.G. 75 1 III 0166 Water Line S.G. 76 1 l/l 0166 Water Line S.G. 77 11122l66 SDGE Electric. -1.5 76 11/22/66 SDGE Electric. -1.5 79 11122l66 SDGE Electric. -1.5 60 l/17/69 Bldg. #2 S.G. l Nuclear Test Method D D D B C C C C B B B B B B B B B B B B (pcf) (“4 (pcf) (“4 122 13.5 111.1 91’ 122 12.9 111.9 92’ 122 14.1 112 92’ 116 17.6 104.4 90’ 120 11.6 116.1 96’ 120 13.3 111.1 93’ 120 14.6 111.5 93’ 120 13 111.7 93’ 116 12 109.6 94’ 116 IO 107.6 93’ 116 14.6 106.6 92’ 116 7.7 112.5 96’ 116 11.3 105.4 91’ 116 II .4 106.9 92’ 116 10.3 110.4 95’ 116 11.6 106.6 94’ 116 14.5 100.4 67’ Failed See#76 116 15.1 107.1 92’ Passed test #77 116 16.3 100.1 66’ Failed See#l13 116 17.1 106.9 90’ APPLIED GEOTECHNICAL ENGINEERING, INC. - - - - - - - - - - - - - - - - - - SUMMARY OF FlELD DENSITY TESTS PRQIECT: Allen Company Project No: 67-l 66-l Page 5 Park 1, Lot 14 Date: August 29, 1969 Palomar Airport RUIEI Fuerte St. Carlsbad FIELD RELATIVE REFER- CRI WATER CRY COM- REMARKS TEST DATECF TEST OEPlHaXr DEN6tlYCCNlENT DENSR-Y PACTIDN la. TEST LOCATION (FEET) CURVE 61 l/17/69 Bldg. #2 S.G. B 62 1117l69 Parking Area S.G. B 63 Ill 7169 Parking Area S.G. B 64 1117l69 Parking Area S.G. B 65 l/17/69 Parking Area S.G. B 66 lll7l69 Parking Area S.G. B 67 1117l69 Parking Area S.G. B 6 6 1 /I 7169 Parking Area S.G. B 69 Ill 7169 Parking Area S.G. B 90 1116l69 Curb & Gutter S.G. B 91 Ill 6169 Curb 8 Gutter S.G. B 92 1 Il6l69 Curb 8 Gutter S.G. B 93 III 6169 Curb 8 Gutter S.G. B 94 111~6/69 Curb 8 Gutter S.G. B 95 III 6169 Curb B Gutter S.G. B 96 Ill 6169 Curb & Gutter S.G. B 97 1116/69 Curb 8 Gutter S.G. B 96 1119l69 Curb 8 Gutter S.G. B 99 l/19/69 Flow Line S.G. B 100 1119/69 Flow Line S.G. B l Nuclear Test Method (Pet) w (pet) 116 19.9 101.3 116 21.7 102.7 116 19.5 106 116 20.3 105.6 116 16.9 105 116 19.3 107.5 116 21 105.3 116 22.1 104.1 116 24.3 99.7 116 22.9 100.3 116 20.3 105.5 116 16.7 106.5 116 14.1 109.9 116 17.6 107.1 116 16.9 104.3 116 14.1 106.7 116 17.6 106.7 116 20.5 104.3 116 22.4 106.1 116 19.3 104.9 APPLIED GEOTECHNICAL ENGINEERING, INC. (“4 67’ 69’ 91’ 91’ 91’ 93’ 91’ 90. 66’ 66’ 91’ 92’ 95’ 93’ 90’ 92’ 92’ 90’ 91’ 90’ Failed See #95 Failed See #91 Failed See #97 Failed See #96 Passed test #62 Passed test #61 Passed test #69 Passed test #90 - - - - - - - - - - - - - - - - - - SUMMARY OF FlELD DENSITY TESTS PROJECT: Allen Company Project No: 67-166-l Page 6 Park 1, Lot 14 Date: August 29, 1969 Palomar Airport RUlEI Fuerte St. Carlsbad FIELD RELATIVE REFER- tHf WATER CRI OOM- TEST DATEOF TEST EPTHB\IcE DENSITY - DENSKY PACTION REMARKS fa. TEST LOCATION (FEET) CURVE 101 1 I1 9169 Flow Line S.G. B 102 1 II 9169 Flow Line S.G. B 103 1120/69 Gas Line S.G. B 104 1 I20169 Gas Line S.G. B 105 1120/69 Gas Line S.G. B 106 112Ol69 Curb 8 Gutter S.G. B 107 1120/69 Curb 8 Gutter S.G. B 106 112Ol69 Curb B Gutter S.G. B 109 1123169 Flowline S.G. B 110 1123169 Flowline S.G. B 111 1123169 Elect. Line - 1 B 112 l/23/69 Elect. Line - 1 B 113 1123l69 Elect. Line - 1 B 114 1126169 Flowline S.G. B 115 1126169 Flowline S.G. B 116 1126/69 Flowline S.G. B 117 1126169 Curb 8 Gutter S.G. B 116 l/26/69 Curb & Gutter S.G. B 119 1131/69 Driveway S.G. B l Nuclear Test Method 9 Sand Cone Test Method (PC0 (PCf) W) 116 17.6 105.9 91’ 116 23.3 99.4 65’ Failed See #I16 116 15.7 106.2 92’ 116 14 107.5 93’ 116 11.4 109.7 95’ 116 22.3 101.9 66’ Failed See#lO6 116 21.6 99.9 66’ Failed See#lO6 116 21.9 104.6 90’ Passed #106,107 116 11.3 111.5 96’ 116 10.6 111.3 96’ 116 13.1 97.7 64’ Failed See#l13 116 20.5 94.4 61’ Failed See#ll3 116 13 105.1 91’ Pass#79,111,112 116 19 107.5 93’ 116 11.3 105.2 91’ 116 19.5 105.7 91’ 116 13.9 109.4 94’ 116 14.3 104.3 90: Passed test #102 116 19.4 105.3 915 - - - - - - - - -. - -. - - - - _- - - SUMMARY OF FIELD DENSITY TESTS PROJECT: Allen Company Project No: 67-166-1 Page 7 Park 1, Lot 14 Date: August 29, 1969 Palomar Airport RUIEI Fuerte St. Carlsbad MAXMUM FIELD RELATIVE REFER. LEN WATER CRf CCM- REMARKS TEST DATEOF TEST CEPTHarr DENSITY CCNTENT DENSiTY PACTiON la. TEST LOCATION (FEET) CURVE 120 II31169 Curb Area S.G. B 121 1131/69 Flow Line S.G. B 122 217169 Flow Line S.G. B 123 217169 Flow Line S.G. B 124 217169 Flow Line S.G. B 125 217169 Flow Line S.G. B 126 217169 Flow tine S.G. B 127 3121169 Parking Area S.G. B 126 3/21/69 Parking Area S.G. B 129 3l21169 Parking Area S.G. B 130 3/21/69 Parking Area S.G. B 131 2121169 Parking Area S.G. B 132 2122169 Parking Area S.G. B 133 2122169 Parking Area S.G. B 134 2/22/69 Parking Area S.G. B 135 2122169 Parking Area S.G. B 136 2122169 Parking Area S.G. B 137 2123169 Parking Area S.G. E 136 2123169 Parking Area S.G. B l Nuclear Test Method 9 Sand Cone Test Method (pet) WI 116 14.2 116 12.4 116 12 116 17.6 116 17 116 15 116 4.3 116 16.5 116 14 116 15.7 116 13.2 116 13.6 116 13.6 116 16 116 12.2 116 14.3 116 15.3 140 6.3 116 11 ‘1.. (pcf) (“4 107 925 102.1 665 Failed, See #I22 112.1 969 Passed test #I21 109.7 959 109.1 945 113.7 96§ 113.2 9’94 112.3 979 112.7 97§ 112.1 97§ 107.3 939 113.7 965 115.4 99§ 112.1 975 114.2 w 115.2 99§ 112.1 97§ ‘137.5 965 112.2 97§ APPLIED GEOTECHNICAL ENGINEERING. INC. - SUMMARY OF FIELD DENSITY TESTS PROJECT: Allen Company Project No: 67-166-1 Page 9 Park 1, Lot 14 Date: August 29, 1969 Palomar Airport RdlEl Fuerte St. Carlsbad - MAXIMUM FIELD RELATIVE REFER- ORI WATER Cftf KM- REfdARKS TEST DATE OF TEST oEPlHB3cEDENsmcoNTENT DENSITY PACTION - N3. TEST LOCATlON (FEET) CURVE 156 - 159 - 160 161 - 162 - 163 164 - 165 - 166 - - - - - - - 313169 Parking Area R.B. 313169 Parking Area R.B. 313169 Parking Area R.B. 313169 Parking Area R.B. 313169 Parking Area R.B. 3127169 Water Trench -1.5 3127169 Sewer Trench -1.5 3127169 Water Trench R.B. 3127169 Sewer Trench R.B. l Nuclear Test Method 5 Sand Cone Test Method E E E E E B C E E (pcf) W) (pcf) w 140 7.1 139 99§ 140 6.4 136.2 99§ 140 7.5 136 99§ 140 5.3 135.9 97§ 140 5.6 139.3 995 116 14.3 110.9 96§ 120 11.1 119.9 995 140 5.3 134.6 965 140 6.4 136.2 979 - APPLIED GEOTECHNICAL ENGINEERING, INC. - - - - - - - - - - - - - - - - - - SUMMARY OF flELD DENSITY TESTS PROJECT: Allen Company Project No: 67-l 66-l Page 6 Park 1, Lot 14 Date: August 29, 1969 Palomar Airport RUlEI Fuerte St. Carlsbad MAxiMuM FIELD RELATIVE REFER- CRf WATER CRY CCM TEST. DATECF TEST E!‘TH B-X.X DENSTTV CCNTENT DENSTTY PACTIDN ND. TEST LCCATiCN (FEET) CUM 139 2123169 Parking Area S.G. B 140 2123169 Parking Area S.G. B 141 2123169 Parking Area S.G. B 142 2123169 Parking Area S.G. B 143 2123169 Parking Area S.G. B 144 2123169 Parking Area S.G. B 145 2123169 Parking Area S.G. B 146 2123169 Parking Area S.G. B 147 312169 Parking Area R.B. E 146 312169 Parking Area R.B. E 149 312169 Parking Area R.B. E 150 312169 Parking Area R.B. E 151 312169 Parking Area R.B. E 152 3/2/69 Parking Area R.B. E 153 312169 Parking Area R.B. E 154 312169 Parking Area R.B. E 155 312169 Driveway R.B. E 156 313169 Parking Area R.B. E 157 313169 Parking Area R.B. E l Nuclear Test Method 5 Sand Cone Test Method (pet) w (pcf) rw 116 9.6 110.5 95§ 116 11 114.3 99§ 116 15 113.6 965 116 11 106.3 935 116 14.4 115.9 995 116 14.7 115.3 99§ 116 12.1 110.7 955 116 16.5 111.7 965 140 5 136.6 96§ 140 5.6 135.2 97§ 140 6.5 133.5 955 140 7.2 139.9 995 140 7.2 135.7 979 140 6.6 133.1 95§ 140 6.7 136.2 99§ 140 6.6 137 96§ 140 5.6 139.9 995 140 6.4 137 96§ 140 6 139.1 99i