Loading...
HomeMy WebLinkAboutCT 74-06; KAMAR PARK-ADAMS; STREET COMPACTION TEST RESULT; 1978-08-09·') ( 3467 Kurtz Street San Diego, California 92110 714-224-2911 Telex 697-841 • Kamar Construction 325 Elm Street Carlabad, California 920~8 Attention: Mr. Jerry Rombotis CARLSBAD TRAC~ 74-6 STREET COMPACTION TEST RESULTS CARLSBAD, CALIFORNIA Gentlemen: woodwarlclyde Consultants A-ugust 9, 1978 Project No. 57209W-FCOI 0 LtE' RECEIVED CITY Of' CARLSB!4D Engineering Department Attached are the results of f.ield density tests taken 'in accordance with ASTM Test No. D. 1556-64, at the subject project at your request and under the direction of Mr. Russ Hughes, on the dates and at the locations jndicated. Also attached are the results of laboratory compaction tests perfor~ed on samples of the materials used for fill. These tests represent the relative compaction and water contents at the locations test.ed. _ Opinions as t.o the rela- tive compaction, water content or sv.itability of the fill in areas not tested will be expressed by us only wbere we have observed the placement of stich fill and have satisfied . ourselvp.~ that construction procedures followed in other areas aJ;e represented by the areas tested. Very truly yours, WOODWARD-CLYDE CONSULTANTS ~~~. James E. Cavallln R.E. 17553 JEC/RPW/EHP/lkm At.tachments (2) Kamar Construction Company (1) City of Carlsbad Engineering Department, Attention; Mr. Russ Morrison Consulting Engineers, Geologists and Environmental Scientists Offices in Other Princip<;i.1 Cities 150 14 0 13 a l2 0 110 100 90 PLASTICITY CHARACTERISTICS Liquid Limit, % Plasticity Ingex,% Classitica~ion by Unified Soil Classification System, , 1\ 1\ 1\ ZERO AIR VOIDS CURVES '\ ' \: 2.80 SG \ 1\ \ 2.70 SG 1\ ' \1\ 2.60 SG \ ~ \ 2.50 SG \ i\ ' \ \ 1\ \ 1\ \ \ \ \ 1\ V-!" \1\ V \' r\,.' \ / \ 1\ \ \\ \ \\ \\ f\ .\ 1\ .... \ \ \\ (.) f\\ \ \ 0. I 1-" \ \ \ ::r: c::J \ \ r\ w 3 \ \ r-..\ I- Z ,\ \ t\ ~ \ 1\ 1\\ >-a:: f\ \ !\ Cl , 100 ~ 80 ~ « 60 0- I- ill 40 u a:: ~ 2 o a • I I I I I I 1 I 1000 100 ; 0 1;0 0.1 0.01 0.001 GRAIN SIZE, mm MECHANICAL ANAL YSIS DIRECT SH EAR TEST DATA Dry Density, pcf Initial Water Content, % Final Water Content, % Apparent Co hesion, .pst Apparent Fri ction Angle, degrees SWELL TES T DATA Initial Dry 0 ensity, pcf I,nitial Water Contef'1t, '% Final Dry De nsity, pct Final Water C ontent, % 1 \;\ f\' I-Load, psI 1\ r\\ ,\ 1\\ ,\ 1\ \ .-\ f\\ 1\ f\ 1\\ r\ , Maximum Dry 12 r-.,.' Density, pet 129.5 '\ Optimum Moisture Content, % 7.5 I 1 I MOISTURE COr-JTENT, % 10 20 30 LABORATORY COMPACTION TEST Swell, percen t " ~ SAMPLE LOCATION ~'\ r\. ,,\ I\' 12 N Santa Fe Pit " f'.' ~ '\ I'\. r-0, f'\ r'\.1 40 LAf30RATORYCOrv;PACTION TEST METHOD: ASIM-D 155770 A FILL SUITABILITY TESTS I ,LAGUNA RIVIERA 6 & 7 ,I DRAWN BY: ALS/ CHECKED BY:~ PROJECT NO: 75-105-23F I DATE: 5-6-76 I FIGURE~NO: 1 " ~ .. WOODWARD·CLYDE CONSULTANTS~ -'-'.' ~. . ~. ." .. -...... : ... e -• COMPACTION TEST RESULTS" j,--' .~ JOIJ NAME CARLSBAD TRACT 74..,.6 DATE REPORTED JULY 18, 1978 JOB NuMBER 57209W-FC01 (STREETS) DATES COVERED JULY 12 -13, 1978 PAGE 1 0.. 1 MOIIlTUR& P'IELD &.A.ORATORY RIt&.ATIYE 'DATE TIIST RETEST ,LOCATION ELEVATION CONTENT OENSITT OKN.!'" COMPACTION NUMBER OP' OP'TEST ~ DRYWT. rep' rep % 0,. &.A •• DENS. JULY 12 S-l CALAVO COURT BETWEEN LOTS 3 & 4 SUBGRADE 9.9 121.5 12-6.0 96 S-2 CALAVO COURT OPPOSITE LOT 9 SUBGRADE 4.3 120.4 126.0 95 S-3 PARK DRIVE OPPOSITE LOT 1 SUBGRADE 6.5 125.7 136.0 97 S-4 PARK DRIVE OPPOSITE LOT 10 SUBG~.DE 9.1 124.4 12-6.0 98 - JULY 13 S-5 CALAVO COURT TOP OF I3ETWEEN LOTS 3 '& 4 BASE -9.9 128.2 129.6 9-9 S-6 CALAVO COURT TOP OF OPPOSITE LOT 9 BASE 5.4 126.5 129.5 97 S-7 PARK DRIVE TOP OF OPPOSITE tOT 1 BASE 4.3 125.3 129.5 96 S-8 PARK DRIVE TOP OF OPPOSITE LOT 10 BASE 5.4 123.2 129.5 95 -Lit;. -Woodward·CIydeConsultants '~ COHSUI:-TING _ENG-INIERS. 9EOL.OCfSTS (j) AND ENVIRONMENTAL. SCIENTIST,S ' :;l' . - --