Loading...
HomeMy WebLinkAboutCT 74-8; NEC Oak Ave and Valley St; Soils Report; 1975-02-21DUCO Engineering, Inc. ,,AF~‘3f* .oUNDlCfloN * GEOL GIG IN”EBT,GATIONL FILL CONTROL -SOIL TESTING 1170 CENTRE DRIVE. SUITE F WN,N”T, CALlFORNlA 91789 (213) 964-3440 . 964.3449 - - -. -. - .- .- - ,.- .-, February 21, 1975 S. L b b Service Corp. P.O. Box B Carlsbad, California 92008 Subject: Report of Compaction Tests Tract No. 74-8 N.E.C. of Oak Ave. and Valley Street Carlsbad, California Job No.: 4-123 RECE/,,, JAN 24 1975 % PF c4R~s~~o Bul’d%? Depa&)@nt Gentlemen: In accordarle with your request this firm has inspected and tested the compac :d fill placed on the subject site between February 18 and February 21, 1975. A plan of the site showing the test locat- ions and other data pertinent to this report is attached as figure number 1. Reference data used in the preparation was a Report of Soils Inves- tigation, dated 11-5-74, prepared by this firm and a Grading Plan of the site prepared by Brian Smith Engineers, Inc. Ground preparation, grading and testing of the site were conducted in the following manner: SITE PREPARATION 1. No surface or subsurface structures were present on the site upon our arrival. 2. Surface debris and vegetation were stripped and hauled offsite. 2: No trees were present on the site. The exposed surface of the natural ground was prepared to rec- eive fill by scarifying to a depth of 8 inches, watering as necessary and compacting to minimum requirements. GRADING 1. Fill soils were spread in 6 to 8 inch loose lifts, watered as necessary and compacted to minimum requirements. 2. The method used for adding moisture and compacting was a water truck and rolling with a dual 5X5 aheepsfoot roller. - Job No.: 4-123 TESTING - 1. Maximum density and optimum moisture were determined for each type of fill soil in accordance with ASTM test method D1557-70. 2. Field density tests were performed in accordance with ASTM test method D1556. 3. Expansion tests using a 60 P.S.F. surcharge load were performed on typical samples of the fill soils remolded to 90% compaction. 4. Results of the field density tests taken during the course of grading are attached as a part of this report. SUMMARY OF LABORATORY TESTS - Soil Type Max. Den. opt. Moist. X Expansion A- Silty Sand 127.5 PCF 8.5% 0.0 - - -. - B- Clayey Silty Sand 127.7 PCF 10.2% 0.3 CONCLUSIONS AND RECOMMENDATIONS The soils on the site are considered nonexpansive. No remedial construction measures are deemed necessary. The allowable soil bearing value for continuous and square foot- ings imbedded a minimum of 12 and 18 inches below the lowest adj- acent finished grade shall be 1500 and 1750 P.S.F. respectively The foregoing values are for dead and live loads and may safely be increased l/3 for temporary horizontal forces. It is the opinion of this firm that the fill placed on the sub- ject site, as reported herein, has been properly compacted and placed on a suitably prepared subgrade and is suitable for the purpose intended. .- Respectfully submitted, Job No.: 4-123 - Test No.- Date - 1 2-18-75 2 ,I - 3 II -4 11 5 2-20-75 - 6 " 7 II - 8 11 -9 2-21-75 10 " - 11 " 12 " - Lot _No. 10 1 9 2 3 3 8 2 9 8 7 4 SUMMARY OF FIELD DENSITY TESTS Elevations I Moist. Dry Den. Soil Nat. Fin. Gr. Test Field PCF Field m 170.0 171.0 170.0 7.0 117.9 A 170.0 ; 171.0 171.0 8.3 117.9 A 172.5 176.0 174.5 8.4 118.4 A 172.0 176.0 174.0 7.9 119.4 A 176.0 180.0 178.0 10.1 115.5 B 177.0 180.0 179.5 10.7 120.6 B 176.3 180.0 178.5 8.8 118.8 A 173.0 .Cl76.0 176.0 8.5 115.8 A 172.0 176.0 176.0 7.9 119.0 A 178.0 180.0 180.0 8.9 119.0 B 180.5 182.0 182.0 8.5 117.1 B 181.0 182.0 182.0 10.2 118.1 B a Camp. 92.5 92.5 92.9 93.6 90.4 94.4 93.1 90.8 93.3 93.2 91.7 92.5 . - - VALLEY s 7-e Duco ENGINEERING .5 LOC~T,ON oF y---J F\CC C+.-iALE I”= 50 Il7A ‘-TUTOC no C,,,TC c Wbl UllT cr., ,c TEST i. ,1 I ~~~~ JOB NO. 4-l?? -. - - - ^