Loading...
HomeMy WebLinkAboutCT 76-15; Palisades Point Stabilization Fill; Soils Report; 1983-10-12- - -~ - ,- I- .- - - - - - - .- October 12, 1983 ENGINEERING OTECHNY-AL CONSUCTANTS W.O. 386904 Mola Development 808 Adams Avenue Huntington Beach, California 92648 Attn: Mr. Chris Christie Mr. John Millet Subject: Stabilization Fill Illustration, Palisades Point Project in Gentlemen: Carlsbad, California As requested, we have prepared an illustration outlining geotechnical requirements for a proposed cement treated stabilization fill for Lots 133 through 136. Construction procedure is anticipated to be similar to the other cement treated stabilization fills already constructed. Again, a two (2%) percent cement mix, temporary backcut of 0.75 to 1, and a six (6") inch perforated subdrain wrapped in filter paper and placed in sand bedding along the backcut may be used. Keyway width is variable, and may be determined by use of the accompanying illustration. If there are any questions, please feel free to contact us. Respectfully submitted: ACTION ENGINEERING CONSULTANTS &BP& BRUCE A. PACKARD RCE 13801 VICE PRESIDENT - ENGINEERING GW:ss attachment: Fill Illustration STAFF GEOLOGIST 1630-G South Sunkist St.. Anaheim, Ca. 92806 (213) 852-4710 (714) 634-2092 L3P3- 93 - - - .- .- - - - - - STABILIZATION FILL - KEY LOCATION WO 3869 - - - - - - - - PROPOSED 1.5:1 FILL SLOPE LOTS 128, 129 AND 130 PALISADES POINT PROJECT CARLSBAD, CALIFORNIA CONDUCTED FOR: MOLA DEVELOPMENT 808 ADAMS AVENUE HUNTINGTON BEACH, CALIFORNIA 92648 W.O. 386905 DECEMBER 12, 1983 1630-G South Sunkist Street Anaheim, California 92806 (714) 634-2092 (213) 852-4710