Loading...
HomeMy WebLinkAboutCT 76-15; PALISADES POINT; PRELIMINARY SOILS INVESTIGATION; 1983-06-30,,-" PRELIMINARY SOILS ENGINEERING INVESTIGATION TRACT No. 76-15 PALISADES POINT CARLSBAD, CALIFORNIA CONDUCTED FOR: MOLA DEVELOPMENT RECEIVED ~lAR 22 1985 CITY OF CARLSBAD ENG1NE~RING DEPARTMENT 808 ADAMS AVENUE HUNTINGTON-BEACH, CALIFORNIA 92648 w.O. 386901 JUNE 30, 1983 1630-G South Sunkist Street Anaheim,. California 92806 (714) 634-2092 (213) 852-4710. ,--~ACTION ~ ENGINEERING '-------------<GEOTECHNIC:AL CONSULTANTS June 30, 1983 Mola Development 808 Adams Avenue Huntington Beach, California 92648 W.O. 386901 Subject: Preliminary Soils Engineering Investigation Tract No. 76-15 Palisades Point Carlsbad, California Gentlemen: Pursuant to your request, a Preliminary Soils Engineering Investigation. was performed at the subject site. The purpose of the investigation was to determine the general engineering characteristics of the soils and bedrock materials on and underlying the site and to provide specific recommendations for the design of foundations and under- ground improvements. It is proposed to develop the site with 139 residential lots t,obe occupied by one and two-story wood frame structures construc,ted over slab on grade. The structural loads are not known at this time, but for the purpose of this report, they are assumed at the twenty (20) kip range for column loads and wall loads in the range of three' (3) kips per lineal foot. Grading will be comprised. of a cut and fill operation. Maximum thickness of fill will be on the order of fifty (50') feet. Cut slopes will be up to sixty-five (65±') feet high at a ratio of 1.5:1 (horizontal:vertical) and fifty (50±') feet high at 2:1. slopes will be up to forty-seven (47±') feet high at a ratio of and sixty (60') feet high at 2:1. J630-G South Sunkist St.. Anaheim. Ca_ 92806 (213) 852-4710 (714) 634-2092 Fill 1.5:1 Mo la Deve.lopment P-e.ge 3 (.~ W.O. 386901 (. borings by backhoe and bucket auger drilling equipment at locations shown on the attached plan. As the :test borings were advanced, the soils were visually classified by the Field Engineer. A summary of the borings is attached. Undisturbed samples for detailed testing in our laboratory were obtained by pushing or driving a sampling spoon into the material. A solid barrel-type spoon was used having an inside diameter of 2.50 inches with a tapered cutting tip at the lower end and a ball valve at the upper end. The barrel is lined with thin brass rings~ each one (1") inch in length. The spoon penetrated into the soil below the depth of boring approximately twelve (12") inches. The central portion of this sample was retained for testing. All samples in their natural field condition were sealed in air-tight containers and transported to the laboratory. LABORATORY TESTING Shear tests were made with a direct shear machine of the strain control type in which the rate of strain is 0.05 inches per minute. The machine is so designed that tests may be performed ensuring ~ minimum of distur- bance from the field conditions. Saturated specimens were subjected to shear under various normal loads. The results of tests, based on ultimate residual values, are tabulated below: Boring Depth in Cohesion Angle of Internal No. Feet Material Lbs./Sq. Ft. Frictipn (Degrees) B-1 44.5 Sandstone 300 35 B-3 26.5 Sandstone 1100 35* TP:-3 11. 0 Claystone** 150 10 (initial shear) 150 20 TP-2 2.0 Silty Sandstone 250 26 TP-4 2.0 Sandstone . O' 39 .-. TP-6 3.0 Terrace Deposit 150 33 . TP-7 4.0 Clayey Sand***' :: 22 400 TP-9 5.0 Sandy Clay 27 250 1630-6 South Sunkist Street Anaheim, California 92806 (714) 634-2092 (213) 852~4 710 A w.o. 386901 Mola Development • P~~e 2 /. SITE CONDITIONS The subject site is a vacant forty-eight (48) acre parcel of gently rolling terrain forming the east flank of a northwest trending ridge- line. It is bound on the east by El Camino Real and existing condo- minium units, and on the north, west and south by vacant land and existing residences. Elevations within the site range from a high of 330± feet along the southwest property line to a low of 120± feet along El Camino Real producing a relief of some 210 feet. Vegetation consists of dry grass and brush and scattered small trees. FILL CONDITIONS Fill materials were encountered as described in the attached Geological Report and illustrated on the Geological Map. These materials are considered to be moderately compact at best. NATURAL CONDITIONS Natural earth materials present consist of residual soils, alluvium,. terrace deposits and sedimentary bedrock. Residual soils and alluvium consist of clayey SANDS and sandy CLAYS. Terrace deposits are composed of firm, RED/BROWN, silty SANDS with occasional lenses of GRAVEL and CLAY SAND. The sedimentary bedrock is made up of two (2) units: (1) a firm, GREY/WHITE, silty and clayey SANDSTONE with (2) interbeds and lenses of GREY/GREEN silty CLAY. Additional details concerning the natural earth materials are presented in the accompanying Geological Report. FIELD INVESTIGATION A field investigation was performed from May 25, 1983 through June 7, 1983, consisting of th~ excavation of fifteen (15) test pits and t630-G South Sunkist Street Anaheim, California 92806 (714) 634-2092 (213) 852-4710 ,. { Mola Development " PaO'e 4 :rlP W.O. 386901 Test results by Woodward-Gizienski & Associates (1973): Sandstone Claystone Compacted Fill .300 600 450 *Test performed at field moisture 35 25 27 **Re-molded to field density and re-sheared three times ***Re-molded to approximately 90% of maximum density Consolidation tests were performed on in-situ moisture and saturated specimens of typical soils. The consolidometer, like the direct shear machine, is designed to receive the specimens in the field condition. Porous stones, placed at the top of the specimens, permit the free flow of water into or from the specimens during the test. Successive load increments were applied to the top of the specimen and progressive and final load settlements under each increment were recorded to an accuracy of 0.0001 inch. The final settlements so obtained are plotted to determine the curves shown in Appendix C. Expansion tests were performed on typical specimens of natural soils. These tests were performed in accordance with the procedures outlined in U.B.C. Standard 29-2. Results of these tests are presented in T~ble II and indicate ,the soil and bedrock materials exhibit expansion potentials ranging from very high to low, with higher values corres- ponding to claystone bedrock and lower values to sandstone bedrock. CONCLusrONS AND RECOMMENDATIONS On the basis of our investigation, development of the site as proposed is considered feasible from a soils engineering s.tandpoint provided that the recommendations,stated herein are incorpo~ated into the design of the grading plan and foundation systems and are implementeq. in the field. Existing trees, low vegetation and old irrigation systems shall be stripped and removed from the site. 1630-G South Sunkist Street' Anaheim, California 92806 (714) 634-2092 (213) 852-4710 Mqla Development P~:~e 5 w.o. 386901 The entire grading operation shall be done in accordance with the attached "Specifications for Grading." All loose alluvial and fill material shall be removed from the proposed fill areas. The bottoms of all excavations shall be inspected by the Project Soil Engineer and Geologist prior to the placement of any fill. Any import fill material to the site shall not have an expansion index greater than twenty (20), and shall be tested by our laboratory~ All grading and/or foundation plans shall be reviewed by the Soil Engineer. SLOPE STABILITY Based on the stability analyses contained i~ App.endix A, the following maximum slope heights are recolllJllended: Slope Maximum Surficial Material Ratio Height Stability Fill Slope 1.5:1 .35 ok , -, 2:1 60 ok Cut Slopes Terrace 1. 5: 1 30 Low Deposits 2:1 65 Low Sandstone 1.5:1 65 ok 2:1 65 ok Claystone 1.5:1 10 Low 2:1 15 Low Surficial stability conditions should be re-evaluated at the time of grading, since loose sands or clay in cut slopes could degrade stability, and fill slopes composed primarily of sand will likely be subject to surficial erosion. Slopes exhibiting low surficial stability should be planted as soon as grading is completed, and it may be prudent to consider the use of 1630-G South Sunkist Street Anaheim, California 92806 (714) ·634-2092 (213) 852-4710 Mola Development P"~ge 6 w.o. 386901 hydromulch or"other means to encourage plant growth and retard slope erosion. The above s lope heights have been determined for the maximum he"ights propo.sed by the current grading plan, .and where. these slopes exceed a factor of safety of 1.5 and 1.1 for static and pseudostatic cases, respectively", lower slope heights are indicated. Local geologic structtlre, and the presence of claystone bodies in cuts, may require ~tabilization; such measures shall be evaluated at the time o.f grading. On the basis of the Geologist's report and stability calculations, it has been determined that the proposed 1.5:1 sixty-five (65±') foot high buttress/cut slope at the rear of Lots 100 through 109 does not exhibit a suitable factor of safety again$t deep seated failure. This slope should be constructed at a ratio of 2:1 or flatter. A retaining or crib wall may be used at the toe of the' slope, in order to prevent reduction in lot sizes. Plans for any such retaining structures should be reviewed by this office prior to construction. Proposed fill slopes over thirty-five (35') feet in height should be flattened from 1.5:1 to 2:1. Additional recommendations regarding slope stability are contained in the attached Geological Report. FOUNDATIONS The proposed structures shall be supported by isolated and continuous spread footings placed a minimum depth of twelve (12") inches below lowest adjacent finish grade utilizing a recommended safe bearing-value of 2600 pounds per square foot and 2100 pounds per square foot, respect- ively. This value is for dead plus live load and may be increased by one-third (1/3) for total including seismic and wind loads. where allowed by code. Increases in bearing capacity for increases in footing dimensions are tabulated below: 1630-G South Sunkist Street Anaheim, California 92806 (714) 634-2092 (213) 852-4710 Mola Development Page 7 Continuous Isolated Minimum Depth (inches) 12 12 Minimum Width (inches) 12 12 Bearing Value (psf) 2100 2600 W.O. 386901 Depth Width (psf/ft) (psf/ft) 314 314 109 105 Maximum 4100 4100 Due to varying expansive conditions, minimum embedments will vary in accordance with the attached "Expansive Soil Recommendations." Footings which span from native material to compacted fill shall be reinfor.ced.: with' a minimum of one (1) 115 bar top and bottom to control potential differential movement. Reinforcing bars shall extend a minimum of ten (10') feet on either side of transition line. Footings placed on or adjacent to slopes shall have a minimum horizontal distance of five (5') feet from .the edge of the footings to the face of the slope. LATERAL DESIGN Lateral restraint at the base of footings and on slabs may be assumed to be the product of the dead load and a coefficient of friction of 0.35. Passive pressure on the face of footings may als·o be used to resist lateral forces. A passive pressure of zero at the surface of finished grade, increasing at the rate of 240 pounds per square foot of depth to a maximum value of 2400 pounds per square foot may be used for natural soil and compacted fill at this site. If passive pressure and friction are combined when evaluating the lateral resistance, the value of the passive pressure should be limited to two-thirds (2/3) of the values given above. EXPANSIVE SOILS Results of expansion tests indicate that the near surface soils have a very low to very high expansion potential (refer to Table I). Expansive soil recommendations in Ap.pendix C shall -be considered in design of foundations and slabs for puildings lying within the respective soil types. A lot by lot testing at the completion of grading will be made to determine the expansion potential. 1630-G South Sunkist Street Anaheim, California 92806 (714) 634-2092 (213)B5N710 . A Mola Development I>age 8 w.o. 386901 Positive drainage away from the foundations shall be maintained. CDT/FILL LOTS On pads where a transition from cut to fill occurs within the planned building area, the natural material should be undercut toa depth of thirty (30") inches below finished grade and replaced as compacted fill to develop a more uniform condition of support for the buildings affected. This requirement may be waived at the discretion of the Soil Engineer if field tests show the natural material. to be satis- factorily compacted -(85% minimum relative compaction) within the specified depth. After completing the undercut,. the exposed surface material should be scarified to a minimum depth of six (6") inches, brought_ to approximate optimum moisture content and compacted to at least ninety (90%) percent of maximum density in preparation to receive fill. As an alternative to undercutting transition pads, it would be acceptable. to deepen footings in shallow fill areas so that the ent-i,re foundation system would rest on natural material. GRADING REQUIREMENTS It is recommended that site grading be carried out in accordance with the "Specifications for Grading" in Appendex B. Additional requirements may be recorrnnended by the Soil Engineer in the course of work, depending upon conditions exposed during grading. SETTLEMENT The maximum anticipated total settlement is on the order of ·one-half (1/2") inch. Differential settlements are expected to be less than one-fourth (1/4) inch, measured between adjacent structural elements. SUBSIDENCE AND SHRINKAGE Subsidence over the site is anticipated to be on the order of 0.20 feet. Shrinkage of reworked materials should be in the range of fifteen (15%) percent. 1630-G South Sunkist Street Anaheim, California 92806 (714) 634-2092 (213) 852-4710 Mola Development .Page 9 , PAVEMENT STRUCTURAL SECTIONS W.O. 386901 Representative samples of subgrade materials should be obtained after the roadways have been rough-graded and tested to establish R~values for use in calculating suitable pavement structural sections for the various areas. UTILITY LINE BACKFILLS It is recommended that backfills placed below and within five (5') feet of buildings, below asphalt concrete pavement and portland cement concrete flatwork, and within ten (10') feet of any slope, be compacted to at least ninety (90%) percent of maximum density. Backfills placed in other areas to be landscaped need only to be compacted to eighty-five (85%) percent of maximum density. All backfills require:~ testing at two (2') foot vertical intervals during placement. On-site sandy materials are considered excellent for use in utility line backfills; however, finer-grained materials may be difficult to compact. As an alternative to compacting the backfills, trenches could be backfilled with a sand-cement slurry containing at least five (5%) percent cement per cubic yard. In this case, field density testing will be waived by this office; however, batch plant tickets and perio.ciic inspection during placement may be required. If the slurry method is selected, eighteen (18") inche.s of compacted,. fine-grained site material should be provided in areas to be landscaped to minimize water infiltration and to promote plant growth. CAVING Caving did not occur in any of the bo:rings drilled for this investigation and is not expected to be of significant concern during grading and construction operations. The regulations of Cal/OSHA should be observed during pe.rformance of all work. FLOQR SLABS Slabs on grade should be designed according to recommendations for medium expansive conditions, as shown in A.ppendix. C. -Care should .. be 1630-G South Sunkist Street Anaheim, California 92806 . (714) 634-2092 (213) 852-4710 MoJa Deve lopment i Page 10 W.O. 386-901 exercised to ensure that reinforcing mesh is placed in the center of the slab. The soil should be kept moist prior to casting the slab. However, if the soils at grade become disturbed during construction, they should be brought to approximately optimum moisture content and be rolled to a firm, unyielding condition prior t·o placing concrete. In areas where a moisture sensitive floor covering will be used, a. vapor barrier consisting of a plastic film (6 mil polyvinyl chloride or equivalent) should be used. Since the vapor barrier will prevent moisture from draining from fresh concrete, a better concrete finish can usually be obtained if at least two (2") inches of sand is spread over the vapor barrier prior to placement of concrete. IN-GRADING TESTING AND INSPECTION Periodic site inspections by our Soil Engineer and/or Qeologist during grading and foundation construction will be necessary to verify the soil and geological conditions encountered during the course of this investigation. Further recommendations may be required if conditions other than anticipated are encountered. In addition, continuous testing during placement of fill will be necessary in order to verify that adequate compaction is being achieved. GENERAL INFORMATION This re.port presents recommendations pertaining' to the subject site based on the assumption that the subsurface conditions do not deviate appreciably from those disclosed by our exploratory excavations. Our recommendations are based on the technical information gathered, our understanding of the proposed construction, and our experience in the geotechnical field. We do not guarantee the performance of the project, only that our engineering work and judgements meet the standard of care of our profession at this time. In view of the general conditions in the area, the possibility of different local .soil conditions cannot be discounted. Any deviations 1630-G South Sunkist Street Anaheim, California 92806 (714) 634-2092 (213) 852-4710 Mola Development Page 11 w.o. 386901 or unexpected conditions observed during construction should be brought to the attention of the Geotechnical Engineer. In this way, any required supplemental recommendations can be made with a minimum of delay to the project. If the proposed construction will differ from our present. understanding of the proj ect, the existing information and pos.sibly new factors may have to be evaluated. Any design changes and the finished plans should be reviewed by the Geotechnical Consultant. Of particular importance would be ext~nding development to new areas, changes in structural loading conditions, postponed development for more than a year, or changes in ownership. This report is issued with the understanding that it is the respon- sibility of the owner, or of his representative, to ensure that the information and recommendations contained here are called to the attention of the Architects and Engineers for the project and incor- porated into the plans and that the necessary steps are taken to see that the Contractors and Subcontractors carry out such recotmnendations in the field. This report is subject to review by the controlling authorities for this project. We appreciate this opportunity to be of service to you. Respectfully submitted: ACTION ENGINEERING CONSULTANTS ~t?~ BRUCE A. PACKARD RCE 13801 VICE PRESIDENT -ENGINEERING GW:RA:ss #a~ «WaKV-GARY ALLACE STA GEOLOGIST 0J~ ROLAND ACUNA STAFF ENGINEER 1630-G South Sunkist Street Anaheim, California 92806 (714) 634-2092 (213) 852-4710