HomeMy WebLinkAboutCT 76-17; CANON PARK UNIT 1, 2 AND 3; SOILS REPORT; 1977-12-07''I' 1 • (1-}1&/11. . tj~~ BENTON ENGINEERING. INC. RECEIV~jf APPLIED SOIL MECHANICS -FOUNDATIONS 6717 CqNVOY COURT SAN DIEGO. CALIFORNIA 92111 DEC 0 81977, PHILIP HENKING BENTON PRESIDENT· CIVIL ENGINEER December 7, 1977 CITY OF CARLSBAD EngineeH~neP'artrnent9t515 La Costa Lemd Company 2100 Costa Del Mar Road Carlsbad, California 92008 Subject: Gentlemen: Proje,ct No. 77-1-50 Results of Field Density Tests Taken iii Trench Backfill Canon Park Unit Nos. 1, 2 and 3 Carlsbad Tract No. 76 .. "17 La Costa Avenue and Cadencia Sfreet Carslbad, California This is to report the res,ults of field density tests taken in soils placed as backfill over certain uti! ity I ines in Cal'lon Park Unit Nos. 1, 2 and 3 in Carlsbad, California. The fests were taken during the weekly periods indicated below: Test Number 1 to 5, ind~sive 6 7 to 27, inclusive 28 to 34, incl-usive 35 and 36 37, 38 and 39 40 to 43, .inclusive Week Ending August 6, 1977 September 24, 1977 October 1, 1977 October 8, 1977 November 19, 1977 November 26, 1977 November 28, 1977 (date of last test) The approximate location at which the tests were taken and the final test results are presented as. follows; Depth of Test Below Maximum Approx-Finished Field Dry Dry Test imate Grade Moisture Density Density Percent No. Location in Feet % dry wt Ib/cu ft Ib/cu ft Compaction Sewer 2.0 13.8 109.5 121.6 90.3 Brava St. Sta. 8+69 Remarks : . • • .. Project No. 77-1-5D La Costa Land Company -2-December 7, 1977 Depth of Test Below Maximum Approx .. Finished Field Dry Dry Test imate Grade Moisture Density Density Percent No. Location in Feet % dry wt Ib/cu ft Ib/cu ft Compaction Remarks 2 Sewer 3.0 13. 1 100.9 118.6 85.1 85% BravaSt. Required Sta. 7+52 3 Sewer 2.0 12.4 " 102.4 114.6 89.4 85% Brava St. Required Sta. 5+80 4 Sewer 2.0 9.5 99.8 115.9 86.1 85% Cadencia St. Required Opp. Lot 3 5 Sewer 3.0 20.1 99.0 116.6 85.0 85% Cadencia St. Required Opp. Lot 6 6 Sewer 4.0 "20.6 100. 1 114.8 87.2 85% Hataca Rd. Required Std.. 5+00 7 Sewer 4.0 21.7 96.5 111.2 86.8 85% Hataca Rd. Required " St.a. 8+75 8 Sewer 2.0 .15.9 97.8 "107.8 90.7 Hataca Rd. Sta. 8+75 9 Sewer 5.0 22.9 97.4 109.0 87.4 85% Hataca Rd. Required Sta 7+00 10 Sewer 3.0 15.9 98.4 109.0 90.2 Hataca Rd. Sta. 7+00 BENTON ENGINEERING. INC. • • Project No. 77-1-5D La Costa Land Company -3-December 7, 1977 Depth of Test Below Maximum Approx-Finished Field Dry Dry Test imate Grade Moistvre Density Density Percent No. Location in Feet % dry wt Ib/cu ft Ib/cu ft Compaction Remarks 11 Sewer 3.0 18.0 95. 1 111 .2 85.5 85% Solano St. Required Sta. 9+70 12 Sewer 1.0 18.5 101.4 111 .2 91.2 Solano St. Sta. 9+70 13 Sewer 4.0 19. 1 96.9 111 .2 87.1 85% Solano St. ·.Required Sta. 6+20 14 Sewer 2.0 16.0 101.7 111 .2 9] .5 Solano St. Sta.6+20 15 Sewer 1.0 10.1 98.8 109.0 90.7 Solano St. Sta. 1 +00 16 Sewer 3.0 14.7 95.8 111.2 86.1 85% Solano St. Required Sta. 4+04 17 Sewer 1.0 13.8 105.8 114.2 92.6 Solano Sf. Sta. 4+02 18 Water 1.0 16.0 105. 1 114.2 92.0 Solano St. Sta. 3+25 19 Woter 1.0 22.6 101. 1 111 .2 91.0 Solano St. Sta.8+15 20 Water 1.0 19.5 87.1 111.3 78.3 Reworked Pueblo St. Sta 11 +00 BENTON ENGINEERING. INC. • e Project No. 77-1-:-5D . La Costa Land Company -4-December 7, 1977 Depth of Test Below Maximum Approx-Finished Field Dry Dry Test imate Grade Moisture Density Density Percent No. Location in Feet % dry wt Ib/cu ft Ib/cu ft Compaction Remarks 21 Water 1.0 17.4 91 • 1 ' 110.4 82.5 Rew'orked Rona Ct. Sta. 0+50 22 Sewer 1.0 14.6 83.5 110.4 75.6 Reworked Rona Ct. Sta. 0+70 23 Sewer 3.0 23.2 93.5 109.2 85.6 85% Cielo PI. Required Sta. 0+70 24 Sewer 1.0 14.7 93.0 109.2 85.2. Reworked Cielo PI. Sta. 0+70 25 Sewer 3.0 13.1 103.6 118.1 87.7 85% Carlino St. Required Sta. 1:0+85 26 Sewer 1.0 12.4 114.4 121.6 94.1 Carlino St. Sta. 10+85 27 Water 1.0 12.7 113.7 121.6 93.5 Carlino St. Sta. 9+90 28 Sewer 1.0 22.0 98.5 109.2 90.2 Check on Cielo PI. # 24 Sta. 0+70 29 Sewer 2.0 14.4 90.8 114.7 79.2 Reworked Ouinta St. Opp. Lot 60 30 Sewer 2.0 10.5 89.0 118.9 74.8 Reworked Del Rey Ave. Opp. Lot 38 BENTON ENGINEERING. INC. e e ,. Project No. 77-1-50 La Costa Land Company -5-December 7, 1977 Depth of Test Below Maximum Approx-Finished Field Dry Dry Test imate Grode Moisture Density Density Percent No. Location in Feet % dry wt Ib/cu ft Ib/cu ft Compaction Remarks 31 Sewer 2.0 10.7 101.,3 118.9 85.3 85% Del Rey Ave. Required Opp. Lot 128 32 Sewer 2.0 22.6 97.1 109.0 89.0 Reworked Easement Between Lots 172-173 33 Sewer 4.0 26.0 93.9 109.0 86.1 Reworked Easement Between Lpts 172-173 34 Sewer 4.0 15.3 112.8 121.6 92.8 E-asement Between Lots 172-173 "35 Sewer 2.0 11.7 103.3 114.7 90.1 Check on # 29 Ouinta St. Opp. Lot 60 36 Sewer 2.0 18.6 100.2 109.7 91.3 Del Rey Ave. Opp. Lot 56 37 Sewer 5.0 19.0 100.-8 109.0 92.5 Easement Between Lots 172-173 38 Sewer 4.0 19.2 103.9 109.0 95.3 Check on # 33 Easement Between Lots 172-173 BENTON ENGINEERING. INC. • Project No. 77-1-5D La Costa Land Company Depth of Test Below Approx-Finished Test imate Grade No. Location in Feet 39 Sewer 2.0 Easement Between Lots 172-173 40 . Water 1.0 Pueblo St. Sta. 11+00 41 Water 1.0 Rona Ct. Sta. 0+50 42 Sewer 1.0 Rana Ct. Sta. 0+70 43 Sewer 2.0 DelRey Ave. Opp. Lot 38 • -6-December 7, 1977 Maximum Field Dry Dry Moisture Density Density Percent % dry wt Ib/cu ft Ib/cu ft Compaction 18.2 104.7 114.1 91.8 18.6 101.4 111.9 90.6 9.8 103.6 110.4 93.8 16.2 100.6 110.4 91.1 14.7 110.2 121.6 90.6 LABORATORY TEST RESULTS The maximum dry densities and optimum moisture contents of the major fi II materials as determined by the A.S. T .M. D 1557-70 methoc;l that uses 25 blows of a 10 pound rammer falling from a height of 18 inches on each of 5 layers in a 4 inch diameter 1/30 cubic foot compaction cyl inder, are presented as follows: Maximum Optimum Mois- Dry Density ture Content Soil Description Ib/cu ft % dry wt Red brown silty clay 111.9 15.3 Brown gray silty clay .109.0 17.8 Light yellow brown silty very fine to tine 109.2 16.8 sand with clay binder and chunks of silty clay Yellow brown very fine to fine sandy clay 110.4 15.5 Gray brown fine sandy clay 110.9 14.3 BENTON ENGINEERING. INC. Remarks Check on # 32 Check on # 20 Check on # 21 Check on # 22 Check on # 30 , .. Project No. 77-1-5D La Costa Land Company Soil Description OHve green silty cloy • -7- Light gray brown clayey very fine to fine sand Gray with red brown and white sil'ty cloy Light brown and gray silty cloy Light yellow brown fine sandy cloy . Light gray clayey silt with streaks of red brown and yellow Light gray brown fine sandy cloy Respectfull y submittedr BENTON ~NGINEERING, INC. ByR.C~ R.C. Remer Reviewed by ~~< ~ S. H. Shu, Civil Engineer R.C .E. No. 19913 Dish: (2) Addressee (1) Addressee Attn: Mr. Burton C. Kromer (2) City of Carlsbad Engineering Deportment (1) Rick Engine,ering Company, Carisbad Maximum Dey Density Ib/cu ft 111 .2 114.2 114.7 118.6 121.6 111.3 118.1 BENTON ENGINEERING. INC. December 7, 1977 Optimum fv\ois- ture Content .% dry wt 15.0 14.4 15.3 14.0 11.5 16.0 14. 1