Loading...
HomeMy WebLinkAboutCT 82-04; PALOMAR OAKS II; RECOMMENDATIONS FOR TEMPORARY SHORING; 1988-08-10I I I I I I I I I I I I I I I I I I I REXmMENDATIOOS FOR TEMPORARY SlDRlN:; ProPOOED OOX ClLVERr P.AICMAR OAKS II SUBDIVISICN '- ~kJ~ (!T8). ... L{ PREPARED FOR: Birtcher Constru.ction 27822 El Lazo Road • Laguna Niguel, California 92656-3989 PREPARED BY: SoutheI:n Califo:rn.ia Soil & Testing, Inc. Post Office Box 20627 6280 Riverdale Street San Diego, California 9212.0 v I I I I I I I I I I I I I I I I I I I SOUTHERN CALIFORNIA SOIL AND TESTING, INC. 6280 RIVERDALE ST. SAN DIEGO, CALIF. 92120 • TELE 280-4321 • P.O. BOX 20627 SAN DIEGO, CAl.IF. 92.120 6 7 BEN T E R P R I S EST. ESC 0 N 0 I 0 0, CAL. I F. 9 2 0 2 5 • TEL. E 7 4 6 -4 5 4 4 August 10, 1988 Birtcher Construction 27822 El Lazo Road Laguna Niguel, California 92656-3989 A'ITENTION: Mr. Michael Dixon SCS&T 8821057 Repc:>rt No. 2-R SUBJECT: Recormendations for Temporary Shoring, Proposed Box CuLvert; Palomar oaks II Subdivision, Carlsbad, California. Gentlem:m: This report has been prepared to present design criteria for tempbraIY shoring along the north side of the proposed box culvert at the subject site. Our recormendations are based on our previous investigations at the site and on three recent test trenches excavated near the north edge of the proposed culvert. The three recent test trenches were excavated to determine what soil conditions will exist along the alignnent of the proposed culvert and to locate the SIX;&E conduit that parallels the culvert. The conduit was fund to be concrete encased with the top south edge located from 3.5 to 5.5 feet below the sidewalk. The south edge is also located about eight feet horizontally from the face-of-curb along the street. The close proximity of this conduit will require shoring for the culvert excavation. On the south side of the culvert the temporaIY slope can be laid back to eliminate the need for shoring. SOUTHERN CALIFORNIA SOIL AND TESTING. INC. I I I I I I I I I I I I I I I I I I I SCS&T 8821057 August 10, 1988 Page 2 A site plan and cross-sections at the two angle points and the center of the culvert are presented on Plates Number 1 through 4. The' cross-sections alsp show the approximate position of the SCG&E conduit. These cro$s-sections illustrate that shoring will be necessary along the north side of the culvert as a result of the SCG&E culvert. The soils exposed in our test trenches ~ generally about four to five feet of medium dense fill over lightly to moderately cemented sandstones. In exception, the test trench at the west angle point encountered either a slopewash material or highly weathered sandstone below the fill. This material was uncenented and had pockets of friable sands. Unshored temporary slopes for the excavation for the culvert may be constructed at a 0.5 to 1.0, horizontal to vertical ratio, with the lower four feet cut vertical. At the west end where the slopewash was found, the slope should be cut at a 0.75 to 1.0 ratio. Shoring consisting of vertical steel H-beam solder beams with treated ~ lagging be~ the beams may be used to shore the north side of the culvert excavation. An allowable passive pressure of 600 pounds per square foot per foot of depth may be used in design of the solder l:Jeam eniJec::lnent. This value should be limited to a maximum value of 8000 pounds per square foot. The allowable bearing capacity of 10,000 psf may be used for solqer beams extending a least 10 feet below the bottom of the excavation. The active pressure for the slope may be assuned. to be equivalent to the pressure indicated in the following diagrams. q, : 120 H, ,PSF H 1 : HEIGHT OF SLOPEABO.VE TOP OF SHORING, FT H 2 : HEIGHT OF SHORING, FT q 2 : .21(q,>, PSF/FT q3 = 2eH2 , PSF/FT I I I I I I I I I I I I I I I I I I I SCS&T 8821057 August 10, 1988 Page 3 The above diagrams is for a sloping backfill (0.5 to 1) and for a drained condition. Surcharge loading from the adjacent street and temporary construction equipment loads should be added to the aforementioned values if necessary. If you should have any questions after reviewing this report, please do not hesitate to contact this office. This opportunity to be of professional service is sincerely appreCiated. Respectfully submitted, SOUI'HERN CALIFORNIA SOIL & TESTING, INC. ~lI'a"t;;. Charles H. Christian, R.G.E. #00215 CHC:m.v cc: (6) Submitted (1) SCS&T, Escondido I I I I I I I I I I I. 1 I I I I I I I PALOMAR OAKS ROAD B LEGEND ~ A CROSS SECTION ~ SOUTHERN CALIFORNIA ~ SOIL & TESTING,INC. A SCALE 1" =20' o 10 20 30 40 Proposed Box Culvert BY: DBA DAT£: 8-11-88 JOB NUMBER: 882105.7 Plate No. 1 I I I I I I I I I I I I I I I I I I I ~ W o M ~------~------~-4~~ ~-------+----~~2 \ Ow· Goa ~ oc I\. a: a: I' GoCJ ~----~----~_\~---+------~--~~~ ~------~--------~~-----~--------~------~o o III ~ o M ~ o ('II ~ o ~ ~ Proposed Box Culvert o o ~ BY: DBA DATE: ~ I c( Z o -.... (J W (/) I (/) (/) o a: (J. ~ SOUTHERN CALIFORNIA ~ SOIL & TESTING,INC. JOB NUMBER: 8821057 Plate No.2 '0 ,.. 1/ I 0 I ,.. ,.. III a: ... .. til' 'I -ea: CJ ::E 0 ...I 0°0 f/) <C Ao-e 0 . ..1 a:' 0 -e_0 '" I A.-ea: en I 0 \0 I I 0 III ... I £Q I £Q I 0 z ~ 0 -l- I 0 w en 0 I I ("\ en en 0 a: I 0 0 IU. 0 f/) N I 0 \ Ow Z AoO = \ Oc ° a: a: a: AoCJ I CJ .... 0 .-c z I -CJ -a: 0 I 0 0 0: 0 0 ~ ("\ N .-.-.-.-.- I I ~ SOUTHERN CALIFORNIA Proposed Box Culvert ~ SOIL & TESTING,INC. BY: B DATE: 8-11-88 I~ JOB NUMBER: 8821057 Plate No.3 I I I I I I I 1 I I I I I I I 'I I I 'I ~ ________ ~~ ____ ~ 0 CO Q ~I ~w ~ f---t-H--'-Q. Q ---1--------+------1 0 Z I ~= Pl, ~ \ /" -' ~ Z -CJ .:c o ~ __ --~,~----+_ __ --_+----~o N , ~-----+4~~----r------_+------~ 0 \ ~ ~------~------~------~------~ 0 o Pl ... o N ~ o ~ ~ 8 Pr osed Box Culvert " o I 0' Z o -t- O w o I 0' o o a: o ~ SOUTHERN CALIFORNIA 'W SOIL & TESTING,INC. 57 plate No. 4