HomeMy WebLinkAboutCT 82-23; Vons Market Pad - ECR & Alga; Soils Report; 1989-12-22INTERIM AS-GRADED REPORT
VONS MARKET PAD PLAZA PASEO REAL COMMERCIAL DEVELOPMENT
EL CAMINO REAL AND ALGA ROAD
CARLSBAD, CALIFORNIA
~~ ~~
PREPARED FOR:
MR. MITCHELL BROWN JOHNSON WAX DEVELOPMENT COMPANY
3150 BRISTOL STREET, SUITE 250 COSTA MESA, CALIFORNIA 92626
DECEMBER 22, 1989 PROJECT NO. 100170-06
Johnson Wax Development Company December 22, 19S9
Project NO. 100170-06
TABLE OF CONTENTS
&
Site Location and Description ...................................... 1
Proposed Construction ........................................... 2
Grading Operations ............................................. I 7
Geolozic Conditions ............................................. 3
Fill Placement ................................................. 3
Conclusions ................................................... 4
Recommendations .............................................. 5
Limitations ................................................... 6
Illustrations
Figure 1 - Site Location Map
Figure 2 - Site Plan
Figure 3 - Geotechnical Map
Figure 4 - Field Density Test Location Map
Table 1 - Summary of Field Density Test Results
Appendices
Appendix A - References
Appendix B - Laboratory Test Results
- December 22, 1989
Project No. 100170-06
Johnson Wax Development Company
3150 Bristol Street, Suite 250 - Costa Mesa, California 92626
Attention: Mr. Mitchell Brown
Subject: Interim As-graded Report, Vons Market Pad, Plaza
Paseo Real Commercial Development, El Camino Real
and Alga Road, Carlsbad, California
-
Gentlemen:
In accordance with your request, we have performed on-site obsemations and soil testing
during grading of the Vons market pad located within the subject development (Figures
1 and 2). This report summarizes our field observations during grading, laboratory and
field density test results, and geotechnical conditions. Foundation and floor slab
recommendations for the proposed market building are also provided.
The market pad is underlain by fill material placed under the observation and testing of
both Geocon, Inc. and Ninyo & Moore. Geocon’s grading reports pertaining to the subject
development are refe.renced in Appendix A. Ninyo & Moore performed a subsurface
investigation to evaluate the previously placed fill material. The results of this investigation
are provided in our report dated August 31, 1989 (Appendix A).
It should be emphasized that this report provides our observations, test results, and
recommendations specifically pertaining to the proposed Vons market. Our findings and
recommendations regarding the entire subject development will be incorporated into om
final as-graded report.
Site Location and Description
The subject site i<!ocated in the eastern portion of Carlsbad in San Diego County. The
- site is bounded by El Camino Real to the east, Alga Road to the south, and undevelop-
ed property to the north and west. The site is legally described as Lot 1 of Carlsbad
- -
10225 Barnes Canyon Road SuiteA-I 12 - San Diego. Callforn!a?2121 * Phone (619) 457-0400 - Fax (619) 556-1236
Johnson Wax Development Company December 22, 1989
Project No. 100170-06
Tract No. 82-23. The market pad is located in the south-central portion of the lot (Figure
2).
Prouosed Construction
Based on review of the grading plans prepared by Rick Engineering Company, dated
November 7, 1989, (Appendix A), and building plans, dated December 21, 1989, prepared
by MCG Architects, the market building will consist of an approximately 45,000 square-
foot, concrete block, one-story structure with a mezzanine level. We understand that the
building will be founded on shallow perimeter footings and isolated interior footings with
a concrete slab-on-grade floor.
Gradinq Operations
Review of Geocon’s grading reports indicated that initial grading of the site was performed
between September 1983 and June 1984. Vegetation, loose topsoil, and loose alluvial soils
were reportedly removed. The exposed natural ground surface was reportedly scarified,
moisture conditioned, and compacted prior to fill placement.
Grading operations, observed and tested by our firm, were performed between September
and December 1989.. The pre-existing fill was scarified, moisture conditioned, and
recompacted prior to additional-fill placement. Localized areas of loose material were also
moisture conditioned and recompacted. Up to approximately 5 feet of additional fill was
placed on the pad during our grading involvement.
Heavy earth moving equipment was used during grading which included scrapers,
bulldozers, and rubber tire compactors. Representatives of our firm performed grading
observations and testing of compacted fill on a full-time basis.
2
Johnson Wax Development Company December 22, 19S9
Project No. 100170-06
Compacted fill material placed on the site during our observation and testing was derived
from on-site and from a nearby borrow area. The borrow area was located roughly 500
feet west of the subject site.
Geologic Conditions
During grading operations, geologic conditions were observed and documented by our field
geologist. Detailed descriptions of the encountered geologic conditions as well as a seismic
analysis will be provided in our final as-graded report for the entire development.
Based on review of geologic data referenced in Appendix A and our visual observations
during grading, the site does not appear to be underlain by any active faults or landslides.
Borings performed at the site indicated that the ground water table is well below the zone
of influence of liquefaction.
Fill Placement
Fill Material Placed Durine Ninvo & Moore's Observation and Testing
Fill materials placed and compacted under the observation and testing of
Ninyo & Moore consisted of on-site and borrow materials. These
materials generally consisted of silty, very fine to medium sand; clayey,
fine to medium sand; silty sandstone; and sandy claystone.
Field density tests performed by our firm indicated a minimum relative
compaction of 90 percent, based on ASTM D1557-78. Compaction tests
were performed in accordance with ASTM D1556-82 (sand cone method)
and ASTM D2937-83 (nuclear gauge method). The results of our field
density tests are presented in Table 1. Test locations are indicated on
Figure 4.
Maximum dry density, optimum moisture content, and expansion index
tests were performed on the fill material placed on the market pad. The
Johnson Wax Development Company December 22, 19S9
Project No. 100170-06
expansion index tests indicated a very low to low potential for expansion,
based on UBC 29-2. The results of our laboratory tests are presented in
Appendix B.
Geocon. Ids. Compacted Fill Soils
Borings performed by our firm during our earlier subsurface investigation
(Appendix A) indicated that the pre-existing engineered fill in the vicinity
of the market pad consisted primarily of clayey sand and sandy clay.
Laboratory tests performed by our firm indicated an average relative
compaction of approximately 90 percent, based on ASTM D1557-78.
Field density tests performed by Geocon, Inc. during grading indicated a
minimum relative compaction of 90 percent, based on ASTM D1556.
Expansion index tests performed by Geocon indicated a very low potential
for expansion. The results of Geocon’s field density and expansion index
tests are provided in their soils reports referenced in Appendix A.
CONCLUSIONS - Based on our review of the materials referenced in Appendix A, grading observations, and
testing, it is our opinion that the grading was performed in substantial conformance with
the recommendations of the geotechnical consultant, site grading plans (Appendix A:
Reference lo), and the requirements of the City of Carlsbad. Field density tests
performed by our firm indicated a minimum relative compaction of 90 percent (based on
ASTM D1557-78) for tests taken on the subject building pad. Expansion tests indicated
a very low to low expansion potential for the near-surface soil on the pad.
-
-
-
- As stated earlier in this report, the site was previously graded under the observation and
testing of Geocon, Inc. It should be emphasized that Ninyo & Moore assumes no
responsibility for the performance of fill material placed under the purview of others. -
4
Johnson Wax Development Company December 22, 1989
Prqject No. 100170-06
RECOMMENDATIONS
Foundation and Floor Slab Design
Foundations and slabs should be designed in accordance with structural
considerations and the following minimum recommendations. The
proposed building may be supported on continuous perimeter footings
founded at a minimum depth of 18 inches below adjacent grade. Footings
should be a minimum of 18 inches wide with at least two number 4
reinforcing bars at the top and bottom, and should conform to the
recommendations of the project structural engineer. Footings conforming
to these minimum specifications may be designed for an allowable bearing
capacity of 2,000 pounds per square foot. Isolated interior footings
founded at a minimum depth of 18 inches below top of slab and having
minimum dimensions of 24 inches square may also be designed for an
allowable bearing capacity of 2,000 pounds per square foot. Isolated
footings should be reinforced in accordance with the recommendations of
the project structural engineer. These bearing capacity values may be
increased by one-third for transient loads such as wind and seismic forces.
The slab-on-grade floor should have a minimum thickness of 6 inches and
should be reinforced with a minimum of number 3 reinforcing bars placed
18 inches on centers in both directions. Slab reinforcement should be
placed within the center one-third of the slab section. Correct placement
of reinforcing steel is vital for the reinforcement to perform adequately.
Floor slabs subject to warehouse-type loads, such as heavy wheel-loads or
high area-loads due to materials storage should conform to the design
recommendations of the project structural engineer. Moisture sensitive
floor slabs should be underlain by a minimum of 2 inches of clean sand,
underlain by a 6 mil or thicker plastic moisture barrier, underlain in turn
by at least 4 inches of 3i8'inch pea gravel or equivalent crushed rock.
5
Johnson Wax Development Company December 22, 1989
Project No. 100170-06
In order to minimize shrinkage cracks, we recommend that the concrete
have a 4 inch slump during placement and be appropriately inspected
and tested. All concrete should be placed on adequately moistened soil.
Surface Drainage
Surface drainage of the lot should be controlled at all times. Positive
surface drainage should be provided to direct surface water away from the
structure and toward the street or suitable drainage facility. Ponding of
water should be avoided adjacent to the structure.
Additional Recommendations
Additional recommendations concerning flatwork design, street and
parking area sections, etc. will be provided in our final as-graded report.
LIMITATIONS
The geotechnical services outlined in this report have been conducted in accordance with
current practice and the standard of care exercised by geotechnical consultants performing
similar tasks in this area. No other warranty, expressed or implied, is made regarding the
conclusions, recommendations, and professional opinions presented in this report. Site
conditions may vary from those observed and described in this report. Our conclusions
and recommendations are based on an analysis of the observed conditions. If actual
conditions differ from those described in this report, our office should be notified and
additional recommendations, if required, can be provided upon request.
6
Johnson Wax Development Company December 22, 1989
Project No. 100170-06
We appreciate the opportunity to be of service. If you have any questions, please contact
the undersigned.
Very truly yours,
NINYO & MOORE
Bruce Bowman
Project Geologist >I i
BDB/CACKCG/atm
Distribution: (4) Addressee
(1) City of Carlsbad, Engineering Department
(1) City of Carkbad, Engineering Department
Attention: Mr. Dick Cook
Attention: Mr. Walter Brown
7
- REFERENCE: 1986 Aerial Fot.o-Map Book.
0 2000 4000
Scale in Feet
NORTH -
I SITE LOCATION MAP
VONS MARKl3 PLAZA PASEO REAL CARLSBAD. CALIFORNIA
PROJECT NO./ DATE
100170-0(5 I 12/89 FIGURE 1
LEGEND
Approxlmata footprlnt of
VONS MAm(ET bulldng
SITE PLAN
VONS MARKET PLAZA PASEO REAL
CARLSBAD. CALIFORNIA
PROJECT NO.1 DATE
100170-06 I 12/89 1 FIGURE 2
TABLE 1 *
SWARV OF FIELD DENSITY TESTS FOR PROJECT # 100170-06
Test A rox Moisture Content Dr Density Relative Soil
No. Date of Test Location Rev Field optiMn Fierd Max. Cnpactlon Type (feeti (X) (X) (Wf) (Wf) (X) No. Remarks Test
6#
8' 711
9* 1 O# 11#
27' 12#
31' 180# 191# 219' 220' 223' 224*
14.1 14.7 16.0 14.9 14.8 16.5 16.8 12.2 12.4 14.5 13.2 12.2 11.0 13.1 12.0
11.7 11.7 10.5 12.0 12.0 12.0 12.0 11.7 11.7 12.0 14.0 12.0 12.0 14.0 14.0
109.4 108.7 117.8 99.9 103.9 116.1 113.7 109.0 108.9 106.8 103.8 107.8 106.1 103.6 103.1
119.8 119.8 122.8 117.7 117.7
117.7 117.7
119.8 119.8 117.7 114.2
117.7 117.7
114.2 114.2
91 91 96 85 88 99 97 91 91 91 91 92 90 91 90
* Test results prescribed on Table 1 include tests performed in the vicinity of
the subject pad by Ninyo & Moore. Results of tests performed by Geocon,
Inc., are provided in their grading reports referenced in Appendix k
! ; 2 RETEST ON 11s 2 RETEST ON 12# 2 RETEST OF 9* 2 RETEST OF lo# 1
2 1
4 2
4 2
4
EXPANSION INDEX TEST RESULTS
Performed in general accordance with UBC Standard 29-2.
NUMBER
INITIAL
MOISTURE
NUMBER SAMPLE
DRY DENSITY
COMPACTED
(PCF)
105.3
100.2
107.5
99.5
MOISTURE FINAL
(8)
18.6
23.3
16.7
21.3
VOLUMETRIC
SWELL
(IN.)
-0.001
0.042
-0.001
0.025
EXPANSION
INDEX
-1
42
-1
25
MAXIMUM DENSITY TEST RESULTS
Performed in general accordance with ASTM D1557-78.
SOIL DESCRIPTION
Yellowish-Tan silty Sand (SM).
Medium brown silty/clayey SAND (SM/SC).
Reddish-Tan silty SAND (SM).
Yellowish-Brown silty SAND (SM).
DRY DENSITY
MAXIMUM
(PCF)
119.8
117.7
122.8
114.2
EXPANSION
POTENTIAL
Very Low
LOW
Very Low
LOW
MOISTURE
OPTIMUM
CONTENT (%I
11.7
12.0
10.5
14.0
THE AYERICAN SOCIETY FOR TESTING AXD MATERILLS !.457.’1 HAS E\’ALCATED THE PRECISION OF TEE ?Ik)iI?lUH
DEXSITY TEST METHOD [ASTM 01557-781, AXD HAS IC3iCATED THAT VARIATIOXS IN THE TEST RESCLTS ChS
OCCL‘R. ASTM DEFISES THE ACCEPThELE RATGE OF XC FZSYLTS IW TABLE 3 IS THE TEXT OF AST?l D1557-7$.
THE RANGE IS COXSIDERED ACCEPTABLE IF THE DIFFERENCE 3ETlCEES ANY TWO RESl‘LTS EXPRESSED AS A PER- CENTAGE OF THE AVERAGE VALUE OF THE TKO RESULTS 3CrS !;@T EXCEED 4.0 PEXCENT. AS SET, ASTX HAS CCT
>E?ZSITY TEST RESULTS COULD hLS0 OCCUR. hCCOECISGLY, THE ACCCMCY OF THE RELATIVE CONFkCTION \-;.ICES REPORTED PRECISION VALUES FOR FIELD DESSITY TEST .‘.:iTAODS, BCT I.:E ESPECT THhT VARIATIOSS IS TEE FIELD
?RESENTED 19 THIS REPORT IS DEPESDEXT 08 THE FREC1S:ON OF THE ASTM TEST ?IETHOD. hND THEREFORE, 7AE TEST RESULTS MAY BE SUBJECT TO VARIATION.
I Vons Market
Johnson Wax Development Company
APPENDIX A
References
December 22, 1989
Project No. 100170-06
1. Eisenberg, L., 1983, “Pleistocene Marine Terrace and Eocene Geology, Encinitas
2. Geocon, Inc., “Geotechnical Investigation for Tentative Planned Development, Map
3. Geocon, Inc., “Report of Testing and Observation Services During Mass Grading
and Rancho Santa Fe Quadrangles.:
82-83, Carlsbad, California,” dated May 25, 1983.
Operations for Carlsbad Tract No. 82-83, Carlsbad, California,” dated May 21, 1984.
4. Geocon, Inc., “Final Report of Testing and Observation Services During Mass Grading Operations for SDP 82-4 and CT 82-23, Carlsbad, California,”
dated September 19, 1984.
5. Ninyo & Moore, ”Geotechnical Investigation, Plaza Paseo Real, El Camino Real
and Alga Road, Carlsbad, California”, dated August 31, 1989.
6. Rick Engineering Company, “Site Grading Plans for Plaza Paseo Real,” dated July
17, 1989.
7. Rick Engineering Company, ”Rough Grading Plans for Plaza Paseo Real,” dated
July 21, 1989.
8. Rick Engineering Company, “Site Grading Plans for Plaza Paseo Real,” dated July
31, 1989.
9. Rick Engineering Company, “Interim Grading Plans for Plaza Paseo Real”, dated
September 9, 1989.
10. Rick Engineering Company, “Site Grading Plans for Plaza Paseo Real,” dated November 7, 1989.
11. Rick Engineering Company, Structural Plans Entitled ”Plaza Paseo Real Vons Market #65, Carlsbad, California,” dated December 21, 1989.
Aerial Photoeraphs
Source Date Scale Flight Numbers
USDA 4-11-53 1:20,000 AXN-8M 21 and 73