Loading...
HomeMy WebLinkAboutCT 82-24; SEA GATE VILLAGE; ADDENDUM TO INTERIM PAVEMENT DESIGN REPORT; 1986-05-28. PACIFIC SOILS ENGINEERING M-1402 W. 240th Street 7370 OPPORTUNITY ROAD, SUITE "N", SAN DIEGO, CALIFO Harbor City, CA 90710-1307. TELEPHONE: (619) 560-1713 (213) 325.7272 or 775-6771 MAY 29 1986 ORANGE COUNTY OFFICE 17909 Fitch CITY OF CARLSBAD Irvine, CA 92714-6097 ENGINEERING DEPARTMENT (714) 863-9118 Grupe Development Company 17800 Castleton Street - Suite 270 City of Industry, CA. 91748 May 28, 1986 Work Order 400011 Attention: Mr. Bruce Crable, Director of Construction Subject: Addendum to Interim Pavement Design Report, Sea Gate Village, Carlsbad Tract No.82-84, in the City of Carlsbad, California References: 1) Interim Pay Gate Village Carlsbad Trdct~!No. dated April 2 , 1986, by Paci ic Soils Engineering, Inc. 2) Project Grading Report for Sea Gate Village, Carlsbad Tract No.82-84, dated November 27, 1985, by Pacific Soils Engineering, Inc. Gentlemen: This report presents engineering data, test results and calcula- tions relative to the pavement design for a portion of the sub- ject project. This report specifically pertains to the limits of interior streets as described below: Street Sea Gate Road Mariner Street Shore Crest Road Limits of Paveflen't De sigh Stations 9 +00 to 12+00 20+00 to 25+69 1 +00 to 5+60 Sample Station 10+80 23+30 3+00 P~e 4pp,ej • Work Order-.40001'1 Page Two May 28,'1986 This report also covers any parking or access areas within these limits. Three (3) subgrade samples were obtained from the private street areas stated above. Classification tests indicated that all the soils were very similar so one (1) "R"-Value test was conducted for analysis. Test results indicated a: "R"-Value of 44 for the interior streets. Sand equivalent tests and hydrometer analysis indicated a S.E. of 21 (81% Sand, 11% Silt, 8% Clay) for Sea Gate Road; a S.E. of 19 (78% Sand, 10% Silt, 12% Clay) for Mariner Street; and a S.E. of 20 (82% Sand, 8% Silt, 10% Clay) for Shore Crest Road. These results are presented on Plate A and Table I. A Traffic. Index of 6.0 has been utilized for Sea Gate Road. A Traffic mdix of 5.0 has been utilized for Mariner Street, Shore Crest Road, access and parking areas, as per the City of Carlsbad, Table A for local streets. The following design claculations are presented: Gravel. Equivalent - 0.0384 (Traffic Index) 100-"R" Use "R" = 44 For Sea Gate Road - T.I. = 6.0 G.E. = 0.0384 (6.0) (100-44) = . :1:2:.:9:0-inches Try 4-inches A.C.over 6-inches Aggregate Base (Minimum section per Table A) -inches 9.3-inches G.E. ::_ 6.6-inches G.E. 15.9-inches G.E. greater than 12.90-inches; okay PACIFIC SOILS ENGINEERING, INC. V Work Order 400011 Page Three May 28, 1986 For Mariner Street, Shore Crest Road, Access and Parking Lanes - T.I. = 5.0 G.E. = 0.0384 (5.,0)(100-44) = 10.75-inches Try 3-inches A.C. over 6-inches Aggregate Base (Minimum section per Table A) c 3-inches A C 7.5-inches G.E. 6-inches. A C 6.6-inches G.E. 14.1-inches reater than 10.75-inches; okay In summary, the recommended sections are: Sea. Gate Road - 4-inches A.C.over 6-inches A.B. Mariner Street, Shore Crest Road, Access and Parking Lanes - 3-inches A.C.over 6-inches A.B. The on-site soils are not expansive in nature and special treat- ment beneath the curb, gutter and sidewalks is not necessary. As a part of preparation for base and asphaltic concrete, the subgrate shall be suitably moisture conditioned, processed and mixed as necessary to attain near optimum moisture and compacted in-place to a minimum of 95 percent of the Laboratory Standard ASTM:D 1557-78. All utility trench backfill should likewise be compacted. Aggregate base material should be placed on the compacted sub- grade and compacted in-place to a minimum of 95 percent of the Laboratory Standard Test Method California 216E., Preparation for compaction operations and base and pavement construction-operations should be accomplished in accordance with current requirements of the City of Carlsbad and under the PACIFIC SOILS ENGINEERING, INC. 1 HO /' Work Order 400011 Page Four May 28, 1986 observation, inspection and testing of a representative of the site soil engineering firm. Respectfully submitted, PACIFIC SOILS ENGINEERING, INC. Reviewed by: By:_r 'oe &~ @, Q DOUG S DUNHAM, REX P. KETTER, R.C.E. 15251 Staff Engineer Executive Vice President Dist: (3) Addressee (2) City of Carlsbad DD/RPK:kr PACIFIC SOILS ENGINEERING, INC. S Work Order 40001.1 May 28, 1986: Sample No. Limits Station 1 Mariner Street between Sea Gate and Winddrift Drive Winddrift to Station 22+00 23+30 = 44 (78%Sand,10%Silt,12%Clay) S.E. = 19 2 Winddrift Drive from Station 22+00 to and including Shore Crest Road Shore Crest Road to Sea Gate Road 3+00 (82%Sand,8%Silt,10%Clay) S.E. = 20 3 Sea Gate Road from Shore Crest Road to Mariner Street, also includes Sea Gate Road recreation parking area 10+80 (81%Sand,ll%Silt,8%Clay) S.E. = 21 PACIFIC SOILS ENGINEERING, INC. EXUDATION PRESSURE CHART 0 MENNNEMENMENNNE uiuimiivaii • II .00 SI 5, ii I, IS PAVEMENT DESIGN DATA C C W.O. 4000 Ii Projectco W P ctYT1 Burint ç A- c '=i-;_. V Sample I ' Location_1fl*Q . STLT Depth-1 - 0 SPECIMEN A ..B C Moisture Content 7 io•I j ,rg jj-.r Compaction Pressure, psi 6e 5 Dry Density, psf Exudation Pressure, psi 51 Q q.z rJcf I Expansio Pressure, sf R-Value by Stabilometer L_f. s f; U.S. STANDARD SIEVE -SIZE