Loading...
HomeMy WebLinkAboutCT 82-24; SEA GATE VILLAGE; INTERIM PAVEMENT DESIGN REPORT NO. 2; 1986-07-02". ..(r,. PACIFIC SOILS ENGINEERING, INC. 7370 OPPORTUNITY ROAD, SUITE "N", SAN DIEGO, CALIFORNIA 92111 TELEPHONE: (619) 560.1713 Grupe Development Company 17800 Castleton Street - Suite .270. City of Industry,' CA. 91748 • COUNTY OFFICE 1402 W. 240th Street Harbor City. CA 907.10.1307 (213) 325.7272 or 775-6771 ORANGE COUNTY OFFICE 17909 Fitch Irvine, CA 92714-6097 (714) 863-9118 July 2,-1986 Work Order 400011 Attention: Mr. Bruce Crable, Director of Construction Subject: . Interim Pavement Design Report No.2, _ .824T1.n the City of Carlsbad, CA. - References: 1) Addendum to Interim Pavement De- sign, Report, Sea Gate Village, Carls- bad Tract No.82-24, dated May 28, 1986, by Pacific -Soils Engineering, Inc.' 2) 'Project Grading Report for Sea Gate Village, Carlsbad Tract No.82-24, dated, November 27,' 1985, by Pacific Soils Engineering, Inc. Gentlemen: This report presents engineering data,' test results and calculations relative to the pavement design for a portion of the subject pro- ject. This report specifically pertains to' the limits of streets as described below:' ' ''Li1ri'ts <'f' :Paven'e.n:t Design 'Street ' , 'S't'at;i:On P.aseo del Norte 26+00 to 36+20 Three (3) subgrade samples were.obtained, from Paseo del Norte. Classification tests' indicated that all the soils were very similar so one (1) "R"-Value test was conducted -for analysis. I., .' I Work Order 400011 Page Two July 2, 1986 Test results indicated a "R"-Valué of 22 and a hydrometer analysis shows there is 71 percent sand, 15 percent silt and '14 percent clay,for a portion of Paseo del Nôrte. All results are present- ed in Table I andon Plate -A. A 'Traffic Index of 8.0 has been utilized for Paseo del' Norte as per discussions with City of Carlsbad personnel and Table 'A for secondary arterial streets. The following design calculation is presented: G.E. = (0.0384) (T.I.) (100-11 R") (0.0384) (8.0) (78) = 24.0-inches G.E. Try '4-inches of A.C.= 8.0-inches G.E. 15-inches of A.B. 16.5-inches G.E. 24.5-inches G.E. Since 24.5 is greater -than 24.0, Section' is okay. In summary the' recommended section .f or a portion of Paseo del Norte is: 4-inches asphaltic concrete., over 15-inches aggregate base The on-site soils are not expansive in nature' and special treat- ment beneath the curb, gutter and sidewalks is not necessary. fAs a part of preparation for base and asphaltic concrete, the .sub- grade shall be suitably moisture conditioned, processed and mixed as necessary,to attain near optimum moisture and compacted in- place to a minimum of 95 percent of the Laboratory Standard ASTM: D 1557-78. All utility trench backfill should likewise be compacted. PACIFIC BOILS ENGINEERING, INC. Work Order 400011 Page Three July 2, 1986 Aggregate base material should be placed on the compacted sub- grade and compacted in-place to a minimum of 95 percent of the Laboratory Standard Test Method California 216E. Preparation for cornpaction'operations and base and pavement construction operations should be accomplished in accordance with current requirements of the City -of Carlsbad and under the observation, inspection and testing of a representative of the-site-soil engineering firm.'.. Respectfully submitted, PACIFIC; SOILSI ENGINEERING, INC; By: ztlot4~ DOUGLOS DUNHAM, Staff Engineer' Dist: (3) Addressee ' (2) 'City of Carlsbad Reviewed by: REX P. KETTER,'R.C.E. 15251 Executive Vice President ' DD/RPK:kr H Work Order 400011 July 2, 1986 T AD L E 1.. Hydrometer Analysis ............... Sample No. Safllple:. :S;t:a:t:in. . %Sn,S.ilt-,%c-1y: 1 . 79 8 13 2 31+00 •. 71 15 14 22 3. 34+00 84 5 11 p PACIFIC SOILS ENGINEERING, INC. . AC.IFrC -.SOTTJS1.NCINEEi(G PAVEMENT DESIGN' DATA C - . I I-' w. o. 400c// Project G1qr ½a,46B Axsao y Sample Location 10,4590 2L. .A'917 (577? Depth /•c; .ø/•5• SPECIMEN A C 1{oisture Content .7. /44 ,2 /S.7 Compaction Pressure, psi 3 4 Dry Density, psf //SB '21.0 1/9.2 Exudation Pressure, psi // 5 Expansion Pressure:pL Q.D. 7 5 it-Value by Stabilometer EXUDATION PRESSURE CEART IIIIMRIIIIRII U UIMI$RIIIIIII U :.UIIIRII$III MRIRi ,IIIIMU$MI$ IIUM.IRRIII .IIIIRUMIUNa MEIRMEEMINERNMEN MENOMONEE so MOMMIKEREAKEEMN MOMEMEEMEMEME •I1IRIIINRIUI MEMEMEMEMWEEME U RIRMIRI*IRI U IIUI•R5SRIII U MRRIRUIiIII U I IMRRIUIIJI•I U $IIRRUUNIRIII • . Is .1. II ii II II II U .S. STANDAIm sirt . • I_a__lI a aaii a- — -- I _____ ,I -j I II II ____ I . I U— TIUUI R-VALUE @ 300 psi 22. SAND EQUIVALENT VALUE PL!TE_/4