Loading...
HomeMy WebLinkAboutCT 83-03; CALAVERA HILLS, 5 LOTS; FIELD OBSERVATION AND RELATIVE COMPACTION TETS; 1983-08-30' • 35 --03 REPORT OF FIELD OBSERVATION AND RELATIVE COMPACTION TESTS CALAVERA HILLS UNIT C AND D. PHASE II CARLSBAD, CALIFORNIA PREPARED FOR: Pacific Scene, Inc. 3900 Harney Street San Diego, California 92110 PREPARED BY: Southern California Soil & Testing, Inc. Post Office Box 20627 6280 Riverdale Street San Diego, California 92120 CT ~3- D3 SOUTHERN CALIFORNIA SOIL AND TESTING, INC. &zeo RIVEROALE ST. SAN DIEGO. CALIF. 92120 • TELE 2804321 • P.O. BOX 20627 SAN DIEGO. CALIF. 92120 678 ENTERPRISE ST. ESCONOIDO, CALIF. 92025 • T E L E 746-4544 August 30, 1983 Pacific Scene, Inc. SCS&T 14181 3900 Harney Street Report No. 6 San Diego, California 92110 SUBJECT: Report of Field Observation and Relative Compaction Tests, Calavera Hills,.Unit C and 'D, Phase II, Carlsbad, California. REFERENCES: 1) Preliminary Geotechnical Investigation for the Proposed Lake Calavera Hills Units C and D, 'Prepared by Wood- ward-Clyde Consultants, dated June 30, 1980. 2) Earthpackage Investigation, Carlsbad Tract 82-47, Prepared by Woodward-Clyde Consultants, dated July •27, 1982. Gentlemen: In accordance with your request, this report has been prepared tO present the results of the field observations and relative compaction tests per- formed at the subject site by Southern California Soil & Testing, Inc. These services were performed between May 13 and August 4, 1983. SITE DESCRIPTION The subject site is an irregular shaped parcel of land that is situated in the Calavera Hills area of Carlsbad, California. Topographically, this site was dominated by two relatively large drainage swales which traversed the site in a general north-south direction. Elevations were observed to range from approximately 190 feet (MSL) in the bottom of the major drain- SOUTHERN CALIFORNIA SOIL AND TESTING, INC. .* SCS&T 14181 August 30, 1983 Page 2 age swale to a maximum on the order of 340 feet. Vegetation at this site consisted of a light grass cover on the ridge tops and dense brush in the drainage swales. This site is surrounded by both developed and undevel- oped residential property. PROPOSED CONSTRUCTION It is our understanding that approximately 130 additional residential units are proposed at this site. These units will consist of one and two story, wood-framed duplex structures with light structural loading condi- tions. AVALIABLE PLANS To assist in determining the locations and elevations of our field density tests and to define the general extent of the site grading for this phase of work, we were provided with .a grading plan prepared by Rick Engineering Company. A copy of this plan is on file at our office which shows the locations of our in-place density tests. SITE PREPARATION - Prior to grading, the areas to be filled were cleaned of debris and vegeta- tion. The soft alluvium in the can were removed to firm natural ground and stockpiled for furture use. Subdrains were then installed as -shown in the referenced reports and at the approximate locations indicated on the approved grading plans. The canyons were then backfilled to within 5 feet of finished grade with mixtures of fractured rock and sandy clays obtained from the on-site cuts. Oversized rocks were placed and control- led as recommended in the referenced reports. All clayey expansive soils were kept at least three feet from finished grade, thus allowing the use of conventional foundational, systems. SOUTHERN CALIFORNIA SOIL AND TESTING. INC. S SCS&T 14181 August 30, 1983 Page 3 The mass grading was performed by Chilcote, Inc. of El Cajon using the following equipment: 5 - 651 Scrappers 3 - D-9 Dozers 1 - D-8 Dozer 1 - 455 Komatsu Dozer 1 - 824 Compactor 1 - 988 Loader 1- Motor Grader 1 - 850 Dozer 1 - 4000 Gallon Water Truck 1 - 8000 Gallon Water Pull 1 - 5 x 5 Sheepsfoot Roller FIELD OBSERVATION AND TESTING Observations and field density tests were performed by a representative of Southern California Soil & Testing, Inc. during the mass grading opera- tions. The density tests were taken according to A.S.T.M. Test 1556-74 and the results of those tests are shown on the attached plates. The locations and elevations of the in-situ tests were determined in accor- dance with their importance and the accuracy and proximity of the survey control provided by other than Southern California Soil & Testing, Inc. representatives. Unless otherwise noted, their locations and elevations were determined by pacing and hand level methods and should be considered accurate only to the degree implied by the method used. As used herein, the term "observation" implies only that we observed the progress of work we agreed to be involved with, and performed tests, on which, together, we based our opinion as to whether the work essentially complies with the job requirements, local grading ordinances and the Uniform Building Code. LABORATORY TESTS Maximum dry density determinations, were performed on representative sam- ples of the soils used in the compacted fills according to A.S.T.M Test SOUTHERN CALIFORNIA SOIL AND TESTING. INC. SCS&T 14181 August 30, 1983 Page 4 1557-78, Method A. This method. specifies that a four (4). inch diameter cylindrical mold of 1/30 cubic foot volume be used and that the soil tested be placed in five'(5) equal layers with each layer compacted by twenty-five (25) blows of a 10 pound hammer with an 18 inch drop. The results of these tests, as presented. on Plate Number 2, were used in conjunction with the field density tests to determine the degree of rela- tive compaction of the compacted fill. CONCLUSIONS Based on field observations and the density test results, it is the opin- ion, of Southern California Soil and Testing, Inc. that the grading was performed basically in accordance, with the recommendations contained in the Geotechnical Report prepared by Woodward-Clyde Consultants dated June 30, 1980, and the. recommendations contained there-in do apply to the subject site. This report covers only the work performed between May13 and August 4, 1983. Additional testing will, be required for utility trench backfill, for retaining wall backfill and for pavement subgrade. . . As limited by the scope of. the seriices which We agreed to perform, our opinions presented herein are based on our observation's and the relative compaction test results. Our work was performed in acc,ordance with the currently, accepted standards of practice'and in such a manner as to pro- vide a reasonable measure of the compliance of the,mass grading operations with the job requirements. No warranty, express or implied is given or intended with respect to the services which we have performed, and neither the performance of those services nor the submittal of this report should be construed as relieving the grading contractor of his primary responsi- bility to conform with the job requirements. SOUTHERN CALIFORNIA SOIL AND TESTING. INC. S SCS&T 14181 August 30, 1983 Page 5 If you should have any questions after reviewing this report, please do not hesitate to contact' this office. This opportunity to be of professional service is sincerely appreciated. Respectfully submitted, SOUTHERN CALIFORNIA SOIL & TESTING, INC. Robert R. Russell, R.C.E. #32142 RRR:mw cc: (6) Submitted (1) SCS&T, Escondido SOUTHERN CALtFORNIA SOIL AND TESTING. INC. DATE B-29-83 JOB NO.14181 ELEV. OR DRY DEN. TEST DEPTH OF MOIST. LBS.! SOIL RELATIVE NO. DATE LOCATION ,. TEST.FT. h CU. FT. TYPE COMP. 01 1 5-13-83 Subdrain Sta. 2+00 255 16.3 109.4 1 93.9 2 5-13-83 Subdrain Sta. 1+10 234 16.3 108.7 1 93.5 3 5-16-83 Subdrain Sta. 0+50 240 16.3 \104.7 1 90.0 4 5-16-83 Subdrain Sta. 1+75 246 14.3 105.2 1 90.4 5 5-17-83 . Subdrain Sta. 0+90 243 16.3 106.5 1 91.5 6 5-17-83 Subdrain Sta. 3+50 264 15.9 104.9 1 90.1 7 5-17-83' Woodstock Street ....- 262 17.6 109.2 1 93.8 8 5-17-83. Lot 240 267 1P.3 109.4 1 93.9 9 5-17-83. Lot 240 . 266 18.3 108.4 1 93.1 10 5-17-83 Lot 239 269 17.6 108.9 1 93.6 11 5-18-83 Lot 240 290 19.0 103.9 1 90.0 12 5-18-83 Lot 240 293 17.6 103.9 1 90.0 13 5-18-83 Lot 206 . 296 13.6 104.2 1 90.1 14 5-18-83 Lot 207 .295 18.4 106.4 1 91.4 15 5-18-83 Lot 208 298 12.4 105.0 1 90.2 16 . 5-18-83 . Lot 208 .- 297 13.0 104.8 1 90.3 17, 5-19-83 Lot 216 .. 300 12.4 105.5 1 90.7 18 5-19-83 . Lot 217 297 16.4 108.7 4 91.3 19 5-24-83 5Ubdrajn Sta. 0+25 280 NG 11.7 106.0 1 91.1 20 5-24-83 Lot 216 282 13.6 110.3 4 92.7 21 . 5-24-83 Lot 224 258 NG 11.7 107.8 4 90.6 22 5-24-83 Lot 223 21 11.1 110.3 4 92.7 23 5725-83 Lot 216 284 13.6 113.5 4 94.5 24 5-25-83 - Lot 217 ' 287 13.6 113.8 4 95.6 25 5-25-83 Lot 217 . 288.5 11.7 116.9 4 98.2 TEST NO. DATE S LOCATION DATE 8-29-83 JOB NO. 14181 ELEV. OR DRY DEN. DEPTH OF MOIST. LBS.! SOIL RELATIVE TEST.FT. % Cu. FT. TYPE COMP. 26 5-25-83 Lot 216 291 13.0 111.7 4 93.9 27 5-25-83 Lot 215 293 7.0 108.5 3 ('T5 28 5-26-83 Lot 215 Retest of #27 - 293 13.0 116.6 3 95.6 29 5-26-83 Lot 217 296 13.6 116.5 3 95.5 30 5-26-83 Lot 217 298 14.3 118.5 3 97.1 31 5-26-83 Lot 218 . 300 14.3 112.9 3 92.5 32 5-26-83 Lot 216 . 302 14.9 113.1 3 92.8 33 5-27-83 Lot 218 . 304.5 11.1 109.1 4 91.7 34 5-27-83 Lot 216 306 16.3 114.4 3 .95.4 35 5-27-83 Lot 217 309 11.7 113.4 . 3 . 93.0 36 5-27-83 Lot 219 311 13.6 . 111.7 4 .93.9 37 5-27-83 Lot 215 311 11.1 108.7 4 91.3 38 5-27-83 Lot 218 313 12.4 114.2 3 93.6 39 5-31-83 Lot 217 314 11.1 114.3 3 93.7 40 5-31-83 Lot 216 316 13.6 112.3 3 92.4 - 41 6-18-83 . Lot 223 290 9.9 110.7 3 90.7 42 6-18-83 Lot 224 . 266 8.7 112.8 3 92,5 43 6-18-83 Lot 223 290 11.1 108.1 6 94.6 44 . 6-20-83 Lot 235 320 14.3 109.1 6 96.0 45 6-20-83 Lot 234 323 14.9 107.4 6 94.3 46 6-20-83 Lot 234 . . 325 15.6 105.7 6 . 92.5 47 6-20-83 Lot 220 . 292 14.3 111.0 6 97.2 48 6-20-83 Lot 222 . 294 14.9 106.6 6 93,3 49 6-21-83 Lot 224 280 13.6 105.2 6 92.1 50 6-21-83 Lot 218 300 14.9 111.9 6 98.1 DATE_!__ JOB NO. 14181 ELEV. OR DRY DEN. TEST. DEPTH OF MOIST. LBS.! SOIL RELATIVE NO. DATE LOCATION TEST.FT. % Cu. FT. TYPE COMP. 51 6-21-83 Lot 235 252 16.3 115.5 3 94.4 - 52 6-21-83 Lot 218 264 16.3 111.0 6 97.3 53 6-21-83 Lot 217 260 14.9 110.6 6 96.8 54 6-21-83 Lot 215 254 15.6 1.13.3 6 99.0 55 6721-83 Lot 214 317 14.3 112.0 6 98.0 56 . 6-21-83 Lot 214 . 315 14.9 110.3 6 96.6 57 6-21-83 Lot 215 315 15.6 .110.2 6 96.5 58 6-22-83 Lot 217 . 317 14.3 106.4 6 93.1 59 .6-22-83 Lot 215 317 16.3 . 112.5 6 98.5 60 6-22-83 Lot213 300 14.9 . 110.7 6 96.9 61 6-22-83 Lot 210 300 13.6 102.9 6 90.0 62 6-22-83 Lot 215 . 319 13.6 103.7 6 90.8 63 6-22-83 Lot 213 • 303 16.3 108.3 6 94.8 64 6-22-83 Lot 213 321 13.0 104.2 6 91.2 65 6-22-83 Lot 231 290 14.3 104.2 6 91.2 66 6-23-83 Lot 235 • 315 13.6 102.8 6 90.0 67 6-23-83 - Lot215 Slope • - 310 14.3 103.6 6 90.7 68 6-23-83 Lot 214 Slope • • 297 16.3 111.5 .6 97.6 69 6-23-83 Lot 223 • 302 14.9 107.0 6 93.6 70 6-23-83 Lot 220 300 14.9 103.4 6 90.5 71 6-23-83 Lot 222 • 302 • 13.6 104.6 6- 91.6 72 6-23-83 Lot 223 • 305 14.9 104.7 6 91.7 73 6-23-83, Lot 221 •. • • 307 14.3 111.7 6 97.8 74 • 6-24-83 Lot. 193 . 270 . 15.6 114.7 3 94.0 75 6-24-83 Lot 199 274 14.9 116.8 3 - .95.7 1 (1 DATE 8_2.9-83...._. JOB NO. 14181 ELEV. OR DRY DEN. TEST DEPTH OF MOIST. LBS.! SOIL RELATIVE NO. DATE LOCATION TEST.FT Cu. FT. TYPE COMP 76 6-24-83 Lot 221 309 14.9 110.4 6 96.6 77 6-24-83 'Lor 219 311 14.3 107.3 6 93.9 78 6-24-83 Lot 222 278 15.6 106.1 6 92.9 79 6-24-83 Subdrain Sta. 0+50 262 15.6 119.1 3 97.7 80 6-25-83 Subdrain Sta. 1+50 264 12.4 107.3 4 90.0 81 6-25-83 Subdrain Sta. 0+90 266 14.3 107.5 4 90.1- 82 6-25-83 Subdrain Sta. 1+20 268 14.9 109.6 4 91.9 83 6-25-83 Subdrain Sta. 2+00 271 17.6 113.3 3 92.9 84 6-25-83 Subdrain Sta. 2+25 287 21.2 107.4 4 90.0 85 6-25-83 Subdrain Sta. 1+60 280 19.8 107.1 4 90.0 86 6-27-83 Lot 224 280 14.3 110.0 6 96.3 87 6-27-83 Lot 222 312 15.6 108.2 6 94.7 88 6-27-83 Lot 220 314 14.9 103.8 6 91.0 89 6-27-83 Lot 221 315 15.6 110.6 6 96.8 90 6-27-83 Lot 219 317 15.6 113.1 6 99.0 91 6-27-83 Lot 224 283 14.3 112.5 6 98.5- 92 6-27-83 Lot 230 S 319 14.3 111.4 6 97.5 93 6-27-83 Lot 222 317 14.3 104.8 6 91.8 94 6-27-83 Lot 219 319 13.0 104.8 6 91.8 95 6-27-83 Lot 223 315 15.6 112.4 6 98.4 96 6-30-83 Lot 216 294 14.3 106.3 6 93.1 97 6-30-83 Lot 218 317 15.6 111.8 6 97.0 98 6-30-83 Lot 223 317 i.6 106.0 6 92.9 99 6-30-83 Lot 214 306 14.9 ' 109.7 6 96.1 100 6-30-83 Lot 193 285 NG 12.4 113.8 4 96.2 TEST NO. DATE S LOCATION DATE. 8-29-83 JOB NO. 14181 ELEV. OR . DRY DEN. DEPTH OF MOIST. LBS.! SOIL RELATIVE 0/ TEST.FT. /0 CU. FT. TYPE COMP. 101 6-30-83 Lot 195 287 15.6 112.9 4 95.4 102 6-30-83 Lot 197 289 14.9 103.3 6 904 103 6-30-83 Lot 199 293 15.6 106.0 6 92.8 104 6-30-83 Lot 224 286 11.6 113.3 6 99.2 105 6-30-83 Lot 204 310 14.3 109.9 6 96.2 106 6-30-83 Lot 200 295 12.4 104.6 6 91.4 107 6-30-83 Lot 204 290 13.6 107.6 4 91.0 108 7-1-83 Lot 175 286 11.1 116.9 3 95.8 109 7-1-83 Lot 177 288 11.1 103.2 4 87.7 110 7-1-83 Lot 180 305. 17.6 109.9 4 92.9 111 7-1-83 Retest of .109 288 . 17.0 110.3 3 904 112 7-1-83 Lot 178 291 15.6 111.0 3 91.0 113 7-5-83 Lot 160 323 8.1 115.5 3 . 94.7 114 7-5-83 Lot 172 320 11.7 118.6 3 98.7 115 7-5-83 Lot 190 300 NG 13.6 112.7 3 92.4 116 7-5-83 Lot 160 326 7.5 108.5 4 91.3 117 7-5-83 Lot 186 296 NG 11.1 109.3 4 92.0 118 7-5-83 Lot 183 310 13.6 108.1 6 94.7 1.19 7-5-83 Lot 189 306. 14.9 . 114.5 4 96.7 120 7-5-83 Lot 175 Slope 290 14.3 1 108.3 6 94.9 121 7-5-83 Lot 178 Slope 300 14.3 105.5 6 92.3 122 7-5-83 Lot 191 303 0.9 107.1 4 90.5 123 7-5-83 Lot 193 298 14.3 113.0 4 95.5 124 7-5-83 Lot 187 309 12.4- 109.6 4 92.6 125 7-6-83 Lot 192 • 306 • 14.9 115.8 4 97.9 DATE 8-29-83 JOB NO. 14181 ELEV. OR DRY DEN. % ]EST DEPTH OF MOIST. LBS.! SOIL RELATIVE NO. DATE LOCATION TEST FT Cu. FT. TYPE COMP. 126 7-6-83 Lot 224 317 15.6 105.9 6 92.7 127 7-6-83 Lot 222 319 15.6 106.2 6 92.9 128 7-6-83 Lot 219 Slope 292 14.9 104.7 6 91.7 129 7-6-83 Lot 217 Slope 300 12.4 103.1 6 90.3 130 7-6-83 Lot 230/228 320 14.9 107.1 6 93.8 131 7-6-83 Lot 229/228 322 FG 13.6 106.5 6 92.3 132 7-6-83 Lot 225/227 320 FG 12.4 109.5 6 95.8 133 7-6-83 Lot 192 300 9.9 108.2 6 94.7 134 7-6-83 Lot 195 . 303 14.9 112.3 6 94.9 135 7-6-83 Lot 249 331 14.3m 108.8 6 95.2 136 7-6-83 .. Lot 248 330 14.3 111.1 6 97.3 137 7-6-83 Lot 249 33.3 14.9 109.1 6 95.5 138 7-7-83 Woodstock Road 333 14.3 102.9 6 90.1 139 7-7-83 Woodstock Road 335 14.9 106.0 6 93.0 140 7-7-83 Woodstock Road 337 13.6 103.9 6 91.0 141 7-7-83 Lot 117 334 14.3 107.2 6 93.4 142 7-7-83 Lot 118 . 336 13.6 106.5 6 93.3 143 7-7-83 Lot 113 333 14.9 108.1 6 94.7 144 7-7-83 Lot 115 338 14.9 104.5 6 91.5 145 7-7-83 Lot 119 . 340 14.3 106.2 6 92.9. 146 7-8-83 . Lot 116 337 14.9 106.8 6 93.7 147 7-8-83 Lot 118 337 13.6 107.4 6 94.1 148 7-8-83 Lot 117 . 336 14.9 105.0 6 91.9 149 7-8-83 Lot 114 . 339 14.3 105.4 6 92.3 150 7-8-83 . Woodstock Extention 327 15.6 108.9 6 95.4 DATE 8-29-83 JOB NO. 14181 ELEV. OR DRY DEN. TEST DEPTH OF MOIST. LBS.! SOIL RELATIVE NO. DATE • LOCATION TEST.FT. % Cu. FT. TYPE COMP. 151 7-8-83 Woodstock 329 15.6 110.3 6 96.6 152 7-8-83 Lot 234 320 14.9 105.4 6 92.3 153 778-83 Lot 236 321 15.6 108.7 6 95.2 154 7-8-83 Lot 167 310 14.3 109.5 4 92.1 155 7-8-83 Lot 169 311 14.3 105.9 6 92.7 156 7-8-83. Lot 194 321 13.6 108.7 4 91.4 15.7 7-8-83 Lot 192 : 323 15.6 111.1 4 93.5 158 7-11-83 Lot 204 Slope . 305 14.9 106.1 6 92.9 159 7-11-83 Lot 200 . .315 14.9 112.4 6 97.8 160 7-11-83 Woodstock Slope . 33(1 8.7 103.0 6 90.2 161 7-11-83 Woodstock Slope i 336 9.9 105.2 6 92.1 162 7-11-83 Lot 197 306 11.1 111.0 4 93.3 163 7-11-83 Lot 915 . . 308 13.0 108.6 6 95.1 164 7-11-83 Lot 202 . ''. 295 12.4 113.7 4 95.6 165 7-1.1-83 Lot 190 311 14.9 104.7 4 91.7 166 7-11-83 Lot 189 . 309 14.3 107.7 4 • 91.0. 167. 7-11-83 ' Lot 193. . ' 311 14.3 109.2 4 91.9 168 7-11-83 ' Lot 196 • 313 12.4 108.4 6 ' 94.9 169 7-12-83 Lot 202 Slope 306; 12.4 109.8 4 92.4 170 7-12-83 Lot 200 300 . 9.9 .113.5 4 94.4 171 7-12-83 Lot.197 309 11.7 , 107.0 6 . 93.7 172 7-12-83 Lot 192 313 15.6 ' 100.5 6 J:8:7:. !9~ 173 7-12-83 Lot 207 319 13.6 110.1 4 92.6 174 7-12-83 Retest of #172 313 1F.,4 106.7 6 93.4 175 7-12-83 ' Lot 204 320 14.3 , 111.8 4 94.0 DATE 8-29-83 JOB NO. 14181 ELEV'• OR DRY DEN. TEST VDEPTH OF MOIST. LBS.! SOIL RELATIVE NO. DATE LOCATION TEST.FT. Cu. FT. TYPE COMP. 176 7-12-83 Lor 206 Slope 318 15.6 108.6 6 95.1- 177 7-12-83 Lot203 Slope 319 13.6 102.1 6 90.0 178 7-12-83 Lot 188 314 14.3 110.4 4 94.8 179 7-12-83 Lot 210 322 14.9 109.3 6 95.7 180 7-12-83 Lot 209 324 FG 15.6 ,. 110.7 6 96.3 181 7-12-83 Lot 226 320.4 10.5 104.4 6 91.4 182 7-12-83 Lots 218/219 321 10.1 102.9 6 90.1 183 7-12-83 Lot 225 319.5 12.5 118.0 4 99.2 184 7-12-83 Lot 224 316 8.3 112.3 6 98.3 185 . 7-12-83 Lot 224 . 319.5 14.2 108.2 6 94.7 186 7-12-83 Lot 218 Slope 298 13.7 112.4 6 98.5 187 7-12-83 Lot 224 Slope 307 8.4 114.4 4 98.1 188 7-13-83 Lot 204 321 9.9 114.4 4 96.2 189 7-13-83 Lot 202 318 13.6 109.7 6 96.1 190 7-13-83 Lot 200 320 12.4 108.6 6 95.1 191 7-13-83 Lot 189 . 312 11.1 106.5 6 93.4' 192 7-13-83 ' ' Lot 191 313 13.6 109.7 6 96.0 193 7-13-83 , Lot 199 322 14.9 114.8 4 96.5 194 7-13-83 Lot 2.01 323 15.6 112.0 6 98.1 195 7-13-83 Lot 212 323 15.6 116.7 4 . 98.1 196 7-13-83 Lot 214 320 13.6 107.3 6 93.9 197 7-13-83 Lot 208 323 11.1 112.9 6 98.9 198 7-13-83 Lot 211 324 1.6 115.1 5 97.5 199 7-13-83 Lot 206 322 13.6 108.8 5 91.4 200 7-13-83 ' Lot 210. 325 FG 12.4 111.8 5. 93.0 DATE 8-29-83 .ELEV. OR TEST DEPTH OF MOIST NO. ' DATE, LOCATION TEST.FT. % JOB NO.14181 DRY DEN. LBS.! SOIL RELATIV Cu. FT. TYPE COMP. 201 7-14-83 Lot 197 317 13.6 108.5 4 90.0 202 7-14-83 'Lot 195 317 14.3 111.6 4 93.4 203, 7-14-83 Lot 193 315 FG 14.9 108.3 6 94.8 204 7-14-83 Lot 207 324 FG 14.9 105.9 6 92.7 205 7-14-83 Lot 183 315 15.6 109.6 6 96.0 206 7-14-83 Lot 200 323 FG 14,9 108.9 6 95.3 207 7-14-83 Lot 198 319 FG 14.3 111.9 6 97.9 208 7-14-83 Lot. 916 318 FG 12.4 110.1 6 96.4 209 7-14-83 Lot 194 318 FG 13.6 112.6 4 94.1 210 7-14-83 Lot 184 317 15.6 97.3 6 211 7-14-83 , Lot 182 320 FG 14.9 103.6 6, 90.8 212 7-15-83 Lot 184 Retest of #210 317 13.6 112.2 6 98.2 213 7-15-83 Lot 166 320 14.3. 115.0 5 95.6 214 7-15-83 Lot 168 322 13.6 110.2 5 91.9 215 7-15-83 , Lot 186 316 FG 13.6 118.0 5 98.8 216 7-15-83 ' Lot 188 ' 316 FG 11.7 101.4 6 88.8 217 7-15-83 Lot 190 315 FG 14.9 113.9 4 95.3 218 7-15-83 Lot 188 Retest of #216- 316 FG 14.3 105.9 6 92.7 219 7-15-83 Lot 194 ' 313 FG 11.7 107.5 4 90.9 220 7-15-83 Lot 196 318 FG 14.3 107.6 4 90.1 221 7-15-83 Lot 197 319 FG 13.0 108.6 4 90.9 222 7-15-83 Lot 199 323 FG 14.3 111.9 4 93.6 223 7-15-83 Lot 187 316.7 13.6 106.3 . 6 92.9 224 7-15-3 Lot 192 14. 4 FC, 13.6 108.9 6 94.7 225 7-15-83 Lot 195 318 FG 14.9 109.1 6 95.5 DATE 8-29-83 JOB NO. 14181 ELEV. OR DRY DEN. TEST DEPTH OF MOIST. LBS.! SOIL RELATIVE NO. DATE LOCATION TEST.FT. % Cu. FT. TYPE COMP. 226 7-18-83 Lot 179, 315 12.4 107.2 6 93.9 227 7-18-83 Lot 175 314 13.6 105.1 6 92.0 228 7-18-83 Lot 177 Slope 302 '13.6 102.6 6 90.0 229 7-18-83 Lot 179 312 14.3 104.9, 6 91.9 230 7-18-83 Lot 180 313 12.4 108.3 6 94.9 231 7-19-83 Lot 176 317 14.3 111.0 6 97.2 232 7-19-83 Lot 178 319 14.9 110.1 6 96.4 233 7-19-83 Lot 174 ' 322 14.3 104.3 6 91.4 234 7-19-83 Lot 155 325 ' 12.4 104.4 6 91.5 235 7-19-83 Lot 130 341 12.4 106.4 6 93.1 236 7-21-83 Lot 144 327 14.9 109.0 6 ' 95.5 237 ' 7-21-83 Lot 142 ' 336 13.6 110.8 6 97.0 238 7-21-83 Lot 146 329 15.6 110.9 6 97.1 239 7-21-83 Lot 137 , ' 336 14.9 106.3 6 93.1 240 7-21-83 , Lot 174 Slope 320 11.7 103.3 6 90.5 241 7-21-83 Lot 133 338. '9.9 109.8 6 96.2 242 7-21-83 , Lot 150 •. . . 331 12.4 106.9 6 93.6 243 7721-83 Lot 169 . 323 14.3 108.0 6 94.6 244 7-21-83 ' Lot 141 340 13.0 105.3 6 92.2 245 7-21-83 Lot 147 335 FG 12.4 ' 106.4 6 93.2 246 7-22-83 Lot 132 340 ' 13.6 107.6 6 94.2 247 7-22-83 Lot 134 341 13.6 105.0 6 91.9 248 7-22-83 Lot 136 ' 342 . 13.6 106.2 , 6 92.9 249 7-22-83 Lot 144 ' , 334 FG 14.3 107.2 6 , 93.9 250 7-22-83 Lot 141 ' ' 341 136 110.1 , 6 96.4 DATE 8-29-83 JOB NO. 14181 ELEV. OR DRY DEN. TEST DEPTH OF MOIST. LBS.! SOIL RELATIVE .00 NO. DATE LOCATION TEST.FT. CU. FT.'TYPE -COMP. 251 7-23-83 Lot 131 341 13.0 103.5 6 90.6 252 7-23-83 Lot 133 342 13.6 105.0 6 92.0 23 7-23-83 Lot 143 334 FG 14.3 108.2 6 94.7 254 7-23-83 Lot 133 343 FG 1.6 107.2 6 93.3 255 723-83 Lot 135 343 FG 13.6 105.4 6 92.3 256 8-2-83 Lot 155 Slope 327 9.9 106.8 6 93.5 257 8-2.-83 Lot 130 Slope 329 9.3 108.2 6 94.8 258 8-2-83 Lot 174 Slope 327 9.9 106.4 6 93.2 259 8-2-83 Lot 174 Slope . 320 9.9 109.4 6 95.7 260 8-2-83 Lot 130 344 9.9 105.4 6 92.3 261 8-4-83 Lot 121 338 12.4 105.5 6 92.3 262 8-4-83 . Lot 123 . 340 12.4 110.4 6 96.7 263 8-4-83 Lot 125 342 13.0 110.4 6 96.7 264 8-4-83 Lot 127 343 13.6 109.9 6 96.2 265 8-4-83 Lot 127 344 . 12.4 111.6 6 97.7 Optimum Moisture Maxinui Dry Density Soil Types (percent) (pcf) 1 13.5 116.4 2 12.5 121.0 3 10.3 122.0 4 11.3 119.3 5 12.3 118.1 6 10.7 114.2