Loading...
HomeMy WebLinkAboutSDP 99-07; RANCHO LA COSTA VILLAGE; INTERIM REPORT OF COMPACTION TESTING; 2001-01-29GEOCON INCORPORATED Project No. 05467-52-07 January 29, 2001 GEOTECHNICAL CONSULTANTS 6 Simac Construction, Inc. 15938 Bernardo Center Drive San Diego, California 92127 Attention: Mr. Richard Simis Subject: RANCHO LA COSTA VILLAGE BUILDING PAD A CARLSBAD, CALIFORNIA INTERIM REPORT OF COMPACTION TESTING References: 1. Update Soil and Gelogic Investigation [forj Rancho La Costa Village Retail Center, Carlsbad, California, prepared by Geocon Incorporated, dated December 23, 1997 (Project No. 05467-12-04). Interim Report of Testing and Observation Services During Site Grading [for] Rancho La Costa Village, Carlsbad, California, prepared by Geocon Incorporated, dated November 27, 2001. (Project No. 05467-12-07) Grading Plans For. Rancho La Costa Village, prepared by Stuart Engineering, dated September 4, 2001. Gentlemen: At the request of your onsite superintendent Mr. Don Anthony, this letter has been prepared to confirm that grading of Building Pad A for the subject development is complete. From a geotechnical standpoint, earthwork operations were performed in substantial conformance with the referenced grading plan and project geotechnical report. A Geocon representative has observed and tested fill soils placed up to rough pad grade for the subject building pad. A final report will be prepared upon completion of grading. Should you have any questions regarding this letter, or if we may be of further service, please contact the undersigned at your convenience. Very truly yours, TED AU SADR #1778 - CERTIFIED * ENGINEERING * p GEOLOGIST A -' 08/3 1/03 OPC .I \14 JIL1M 4OFESS/Ok Shawn Weedon (( RCE 61803 UJ c61803 cr Exp: 06/30/05 SW:AS : dlj (4) Addressee (2/del) Simac Construction Inc. (Job Site) 6960 Flanders Drive 0 San Diego, California 92121-2974 U Telephone (858) 558-6900 0 Fax (858) 558-6159