HomeMy WebLinkAboutAMEND 2017-0020; GRAND PACIFIC PALISADES RESORT; GEOTECHNICAL INVESTIGATIONS; 2017-11-20Geotechnical
Engineering
Services
GEOTECHNICAL INVESTIGATION
Hilton Tapestry Resorts Expansion
5803 Armada Drive
Carlsbad, California
Material
Inspection
and Testing
Environmental
Services
•
•
01 l·llT' I,()( \Tf(l',S
OH\\!;!· Cot 'd\
( 0/H'Ol{ \ IT Im\ V II
'c11,1' I I ,'j l'.ili:1:1 \'sl'l1lll
S1111,· \
\1uh,·ui;. ( .·\ ,;:s,1r1
I ,:I I l 11 ;_:, _''-1'-/-'
f·:/\ ; 1-1 I\< .. ' -~•)'' i
S\\ l>!l·LO
hll'Ll<:l \I ('Ot '\ 1 \
,. n ''J_, f,·1rh -.;q11;11,
•
•
•
•
•
•
•
•
-
---
--
l's·! S."'":; r: YJ'J<l
!·:\\ """ i ,, <•)'",11
ht ,,11 L\IP!l{I
Huitd11L' .:.\
{)('/1.\/h.t \\Pl·.\ll'HU
l)\'-,l' \ I( ll
."'i ,, 1>11-1.n IW.;r, nu
11 '·' 11 llil~'I 1111: ,·, 111
(;eotechnical Engineering
Construction Inspection
Materials Testing
Environmental
GEOTECHNICAL INVESTIGATION
Hilton Tapestry Resorts Expansion
5803 Armada Drive
Carlsbad, California
Prepared For:
Grand Pacific Palisades Hotel, LP
5900 Pasteur Court, Suite 200
Carlsbad, California 92008
Prepared By:
MTGL,lnC .
6295 Ferris Square, Suite C
San Diego, California 92121
November 20, 2017
MTGLProjectNo.1916A12
MTGLLogNo.17-1619
'
-<f:CFIVED
DE[ 0 6 2017
CITY Or' CARL~BAu
ni I\NNlt\lf~ DIVISION
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
.. ..
•
•
• -
-
• -
.. .. ..
• .. ()I{\ '-<,I COi 'n
('1HW11k\ll H!{\\,("ll
,. Su11,_' \ .. ..
-.. ..
-
..
-..
-..
-
• -
• ..
• -.. ..
• .. .. .. -
\11,:lt,·:iH. ( .\ \J_;:,-;1 ii,
I ,_'I -,, I l hi' ~<i•J<J
]·_1\ ~1-1-,,~.2>f.'l
s,, DtH,O
l\li'l'KI\I ('OI "\l"\
1-,.:,;_, f ,·n1·_ "q11:1k
Su1l,: l.
J ,·I ;-,_,;-, i;" ~ci•J''
! .i \ ,,;-.;\ ,; ; ·: "lq,,l I
I ; . .;1,i \1:11dun l',11-k\1->;
OC/1 \/hl ,,11E\Ll'HH:
l)f'.-,1' \ l ( ·11
:,.,111 i. i') I _2<11 •I I
'..; \ ", IJJJ-l :i I l)ISI' \ H 'H
\\\1\\ 11Li·_,\i11,·c·1,n1
November 20, 2017
Grand Pacific Palisades Hotel, LP
5900 Pasteur Court, Suite 200
Carlsbad, California 92008
Attention: Mr. Houston Arnold
Geotechnical Engineering
Construction Inspection
Materials Testing
Environmental
MTGLProjectNo. 1916A12
MTGL Log No. 17-1619
Subject: GEOTECHNICAL INVESTIGATION
Hilton Tapestry Resorts Expansion
5803 Armada Drive
Carlsbad, California
Dear Mr. Arnold:
In accordance with your request and authorization we have completed a
Geotechnical Investigation for the subject site. We are pleased to present the
following report which addresses both engineering geologic and geotechnical
conditions including a description of the site conditions, results of our field
exploration and laboratory testing, and our conclusions and recommendations for
grading and foundations design .
Based on our investigation, the site will be suitable for construction, provided the
recommendations presented herein are incorporated into the plans and specifications
for the proposed construction. Details related to geologic conditions, seismicity, site
preparation, foundation design, and construction considerations are also included in
the subsequent sections of this report.
We appreciate this opportunity to be of continued service and look forward to
providing additional consulting services during the planning and construction of the
project. Should you have any questions regarding this report, please do not hesitate
to contact us at your convenience .
Respectfully submitted,
MTGL,Inc.
4(,~
Sam E. Valdez, RCE 56226, GE 2813
Vice President\ Engineering
Page i of iii
.. --.. .. -..
,. .. .. ..
• .. -.. -
--..
.. -
--•
•
• ..
• ..
• ..
• ..
• ..
•
• ..
-
Hilton Tapestry Resort Expansion -Geotechnical Investigation
Carlsbad. California
TABLE OF CONTENTS
MTGL Project No. 1916A12
MTGLLogNo.17-1619
1.00 INTRODUCTION ...................................................................................................................... 1
1.01 PLANNED CONSTRUCTION .......................................................................................................... I
1.02 SCOPEOFWORK ........................................................................................................................ l
1.03 SITE DESCRIPTION ...................................................................................................................... 1
1.04 FIELD INVESTIGATION ................................................................................................................ 2
1.05 LABORATORYTESTING .............................................................................................................. 2
1.06 PERCOLATION TESTING .............................................................................................................. 3
2.00 FINDINGS .................................................................................................................................. 4
2.01 REGIONAL GEOLOGIC CONDIDONS ............................................................................................ 4
2.02 SITE GEOLOGIC CONDIDONS ..................................................................................................... 4
2.03 GROUNDWATER CONDIDONS ..................................................................................................... 5
2.04 FAULTING AND SEISMICITY ......................................................................................................... 5
2.05 LIQUEFACTION POTENTIAL .......................................................................................................... 5
2.06 LANDSLIDES ................................................................................................................................ 6
2.07 TSUNAMI AND SEICHE HAZARD .................................................................................................. 6
3.00 CONCLUSIONS ........................................................................................................................ 7
3.01 GENERALCONCLUSIONS ............................................................................................................ 7
3.02 EARTIIQUAKE ACCELERATIONS\ CBC SEISMIC PARAMETERS .................................................. 7
3.03 EXPANSION POTENTIAL .............................................................................................................. 8
4.00 RECOMMENDATIONS .......................................................................................................... 9
4.01 EXCAVATION CHARACTERISTICS/SHRINKAGE ........................................................................... 9
4.02 SETILEMENT CONSIDERATIONS ................................................................................................. 9
4.03 SITE CLEARING RECOMMENDATIONS ....................................................................................... 10
4.04 SITE GRADING RECOMMENDATIONS -STRUCTURES ................................................................ 10
4.05 SITE GRADING RECOMMENDATIONS-CUTIFILL TRANSIDON ................................................. 11
4.06 SITE GRADING RECOMMENDATIONS -HARDSCAPE ................................................................ 11
4.07 COMPACTION REQUIREMENTS ................................................................................................. 11
4.08 FILL MATERIALS ...................................................................................................................... 11
4.09 SLOPES ..................................................................................................................................... 12
4.10 FOUNDATIONS .......................................................................................................................... 12
4.11 CONCRETE SLABS ON GRADE AND MISCELLANEOUS FLATWORK ........................................... 13
4.12 PREWETTING RECOMMENDATION ............................................................................................ 14
4.13 CORROSIVITY ........................................................................................................................... 14
4.14 RETAINING W ALLS ................................................................................................................... 15
4.15 FOUNDATION SETBACKS .......................................................................................................... 16
4.16 Bro RETENTION BASIN ............................................................................................................. 17
4.17 CONSTRUCTION CONSIDERATIONS ........................................................................................... 17
4.17.1 MOISTURE SENS/TN£ SOll,S/WEATHER RELATED CONCERNS ............................................... 17
4.17.2 DRAINAGE AND GROUNDWATER CONSIDERATIONS .............................................................. 18
4.17.3 TEMPORARY EXCAVATIONS AND SHORING ........................................................................... 18
Page ii of iii 5 Fcrrif> Square. Suite C
San Diego. CA 92121
(858) '.117-3999
.. .. .. -.. .. .. ..
--
•
.. .. .. .. .. .. .. ..
-
• ..
• .. .. .. .. .. ..
.. ..
---
Hilton Tapestry Resort Expansion -Geotechnical Investigation
Carlsbad, California
MTGLProjectNo. 1916Al2
MTGLLogNo. 17-1619
4.17.4 UTIUTYTRENCHES ............................................................................................................. 20
4.17.5 SITE DRAlNAGE ................................................................................................................... 21
4.18 GE0TECHNICAL OBSERVATION/TESTING OF EARTHWORK OPERATI0NS ................................. 21
5.00 LIMITATIONS ........................................................................................................................ 22
ATTACHMENTS:
Figure 1 -Site Location Map
Figure 2 -Site Plan
Figure 3 -Retaining Wall Drainage Detail
Appendix A -References
Appendix B -Field Exploration Program
Appendix C -Laboratory Test Procedures
Appendix D -Percolation Test
Appendix E -Standard Earthwork and Grading Specifications
Page iii of iii
5 Ferri~ Square. Suite C
San Diego, CA 92121
(858) 537-3999
.. .. --.. ..
• -.. -.. .. ..
• ..
11
• .. ..
• .. .. ..
• ..
• ..
...
-
• .. ..
..
• --.. ..
Hilton Tapestry Resort Expansion -Geotechnical Investigation
Carlsbad, California
MTGL Project No. 19!6Al2
MTGL Log No. 17-1619
1.00 INTRODUCTION
In accordance with your request and authorization, MTGL, Inc. has completed a Geotechnical
Investigation for the subject site. The following report presents a summary of our findings,
conclusions and recommendations based on our investigation, laboratory testing, and engineering
analysis .
1.0 I Planned Construction
It is our understanding that one three-story hotel building is planned to be constructed between the
existing Karl Strauss restaurant and hotel in an area that is currently occupied with grass
landscaping and hardscape. The hotel building pad is anticipated to have a finish grade elevation
that is close to existing elevations of 155 feet ms!. Other improvements at the site are to include
retaining walls and associated underground utilities.
1.02 Scope of Work
The scope of our geotechnical services included the following:
• Review of geologic, seismic, ground water and geotechnical literature .
• Logging, sampling and backfilling of two exploratory borings drilled with a 6-inch diameter
solid-stem auger limited access drill rig to a maximum depth of 45½ feet below existing
grades. Appendix B presents a summary of the field exploration program .
• Laboratory testing of representative samples (See Appendix C) .
• Geotechnical engineering review of data and engineering recommendations .
• Performing of two (2) percolation tests in the proposed development area .
• Preparation of this report summarizing our findings and presenting our conclusions and
recommendations for the proposed construction .
1.03 Site Description
The project is located at 5803 Armada Drive, Carlsbad, California, see Site Location Map, Figure 1.
There is an existing Hilton hotel resort at the site. The area where the proposed hotel building is to
be located is a landscaped area east of an existing hotel building. A conference building and Karl
Strauss restaurant border the area on the northern and eastern sides. A retaining wall and walkway
border the area on the south. The Site Plan, Figure 2, shows the proposed development area .
Page 1 of 22
5 Ferris Square. Suite C
San Diego, CA 92121
(858) 517-3999
-,.
.. -.. -----.. -..
• .. ..
• .. .. .. .. .. .. ..
-• -•
.. ..
•
• ..
---..
Hilton Tapestry Resort Expansion -Geotechnical Investigation
Carlsbad, California
MTGL Project No. 1916A12
MTGLLogNo. 17-1619
The site was previously graded in the 1990s and developed into a hotel resort in the late 1990s
(Leighton and Associates. Inc., 1997). The area is relatively flat with an elevation of 155 to 156
feet above mean sea level (ms!). A retaining wall located south of the site was constructed to raise
the area to current grade.
1.04 Field Investigation
Prior to the field investigation, a site reconnaissance was performed by an engineer from our office
to mark the borings, as shown on the Site Plan, and to evaluate the boring locations with respect to
obvious subsurface structures and access for the drilling rig. Underground Service Alert was then
notified of the marked location for utility clearance .
Our subsurface investigation consisted of drilling test borings utilizing a limited access drill rig
equipped with a 6-inch diameter solid stem auger. See Appendix B for further discussion of the
field exploration including logs of test borings .
Borings were logged and sampled using Modified California Ring (Ring) and Standard Penetration
Test (SPT) samplers at selected depth intervals. Samplers were driven into the bottom of the boring
with successive drops of a 140-pound weight falling 30 inches. Blows required driving the last 12
inches of the 18-inch Ring and SPT samplers are shown on the boring logs in the "blows/foot"
column (Appendix B). SPT was performed in the borings in general accordance with the American
Standard Testing Method (ASTM) D1586 Standard Test Method. Representative bulk soil samples
were also obtained from our borings and test pits .
Each soil sample collected was inspected and described in general conformance with the Unified
Soil Classification System (USCS). The soil descriptions were entered on the boring logs. All
samples were sealed and packaged for transportation to our laboratory .
I.OS Laboratory Testing
Laboratory tests were performed on representative samples to verify the field classification of the
recovered samples and to determine the geotechnical properties of the subsurface materials. All
laboratory tests were performed in general conformance with ASTM or State of California Standard
Methods. The results of our laboratory tests are presented in Appendix C of this report .
Page 2 of 22
.:'i Ferri~ Square, Suite C
San Diego, CA 92121
(858) 537~3999
---.. .. -.. ..
-..
-..
•
•
•
•
•
•
•
•
--
---
..
..
.. ..
..
-..
-
-
Hilton Tapestry Resort Expansion -Geotechnical Investigation
Carlsbad. California
1.06 Percolation Testing
MTGL Project No. 1916Al2
MTGLLogNo. 17-1619
Percolation testing was conducted m general accordance with the guidelines presented in the
Design Manual for Onsite Wastewater Treatment Systems, 2010 Edition of the County of San
Diego Department of Environmental Health, Land and Water Quality Division. Two (2) test holes
were drilled to about 5 feet below existing grade within the fill soils. The holes were pre-socked
overnight and the tests were performed on November 14, 2017. The results indicate an infiltration
rate of 0.956 inches per hour for P-1 and 0.638 inches per hour for P-2. Appendix D presents the
results of the Percolation Testing .
Page 3 of22
5 Fenis Square, Suite C
San Diego. CA 92121
(858J 537-3999
--.. ..
-..
-..
..
-..
-..
... ----
-------..
... .. .. --
-----
Hilton Tapestry Resort Expansion -Geotechnical Investigation
Carlsbad. California
2.00 FINDINGS
2.01 REGIONAL GEOLOGIC CONDIDONS
MTGL Project No. 1916A12
MTGLLogNo.17-1619
The site is located in the coastal portion of the Peninsular Range Province of California. This area
of the Peninsular Range Province has undergone several episodes of marine inundation and
subsequent marine regression throughout the last 54 million years, which has resulted in the
deposition of a thick sequence of marine and nonmarine sedimentary rocks on the basement rock of
the Southern California Batholith. Gradual emergence of the region from the sea occurred in
Pleistocene time, and numerous wave-cut platforms, most of which were covered by relatively thin
marine and nonmarine terrace deposits, formed as the sea receded from the land. Accelerated
fluvial erosion during periods of heavy rainfall, coupled with the lowering of the base sea level
during Quaternary times, resulted in the rolling hills, mesas, and deeply incised canyons which
characterize the landforms in the general site vicinity today.
2.02 SITE GEOLOGIC CONDIDONS
As observed during this investigation, and our review of geotechnical maps, the site is underlain at
depth by Quaternary-aged Old Paralic Deposits, Unit 2-4 Undivided (QoP2-4) and Tertiary-aged
Santiago Formation (Tsa). Previously placed engineered fill materials were encountered above the
formational materials. Logs of the subsurface conditions encountered in our borings are provided
in Appendix B. Generalized descriptions of the materials encountered during this investigation are
presented below.
Previously placed fill soils were encountered in the borings and extended up to 8½ feet below
existing grade. As observed in our borings the fill materials consisted of reddish brown Silty Sand
(SM) that was fine to coarse grained, moist to wet, and medium dense. In general, the fill soils are
not considered suitable for support of proposed loading in their current condition.
Recommendations are presented in this report for remedial grading of existing fill materials .
Quaternary-aged Old Paralic Deposits, Unit 2-4 Undivided (Qorz-4) [formerly Terrace Deposits]
was encountered in the borings at depths that ranged from existing seven (7) to 8Y2 feet below
existing grade. As observed in our explorations, the Old Paralic Deposits consisted of Silty
Sandstone 'SM', Poorly Graded Sandstone with Silt 'SP-SM', and Poorly Graded Sandstone 'SP'.
Colors ranged from reddish brown, light brown, orangish brown, yellowish brown, and gray. The
sandy materials were fine to coarse grained, moist, and weakly to moderate cemented. In general,
the Old Paralic Deposits are considered suitable for support of structural loading in their current
condition.
Page 4 of 22
5 Ferris S4uarc. Suite C
San Diego, CA 92121
(858) :\17-3999
-,.
---,.
-----• .. .. .. .. .. -------.. .. .. -.. ..
-.. .. -... ..
,.
Hilton Tapestry Resort Expansion -Geotechnical Investigation
Carlsbad, California
MTGLProjectNo.1916Al2
MTGL Log No. 17-1619
Tertiary-aged Santiago Formation was encountered below the Old Paralic Deposits. The Santiago
Formation material encountered consisted of light brown, fine grained Silty Sandstone 'SM' that
was moist and weakly cemented. Gravel was encountered in the borings at the contact between the
Old Paralic Deposits and Santiago Formation. In general, the sandy materials of the Santiago
Formation are considered suitable for support of structural loading in their current condition;
however, there are highly expansive clayey portions of the formation that require special handling
during construction.
2.03 Groundwater Conditions
Groundwater was not encountered in the borings drilled for this investigation. Based on the relative
density of the formational materials at the site there is a high potential for perched water to appear
along the contact between the fill soils and the formational materials. It should be recognized that
excessive irrigation, or changes in rainfall or site drainage could produce seepage or locally perched
groundwater conditions within the soil underlying the site .
2.04 Faulting and Seismicity
Active earthquake faults are very significant geologic hazards to development in California. Active
faults are those which have undergone displacement within the last approximately 11,000 years.
Potentially active faults show evidence of displacement within the last approximately 1.6 million
years. The site is not located within an Alquist-Priolo Earthquake Fault Zone and there are no
known active faults mapped through the site, therefore, surface rupture of an active fault is not
considered to be a significant geologic hazard at the site .
Potential seismic hazards at the site are anticipated to be the result of ground shaking from seismic
events on distant active faults. The nearest known active fault is the Rose Canyon fault zone, which
is located about 4.5 miles west of the site. A number of other significant faults also occur in the
San Diego metropolitan area suggesting that the regional faulting pattern is very complex. Faults
such as those offshore are known to be active and any could cause a damaging earthquake. Other
active faults within the region include the Coronado Banks fault zone, approximately 20.4 miles
southwest of the site, and the Elsinore fault zone, approximately 23.1 miles northeast of the site.
The San Diego metropolitan area has experienced some major earthquakes in the past, and will
likely experience future major earthquakes .
2.05 LIQUEFACTION POTENTIAL
Page 5 of22
S Fcnis Square, Suite C
San Diego, CA 92121
(85HJ 537-3999
----.. ..
-
----
------
• ---..
----
-.. ..
11
------..
Hilton Tapestry Resort Expansion -Geotechnical Investigation
Carlsbad, California
MTGL Project No. 1916Al2
MTGLLogNo. 17-1619
Liquefaction is a phenomenon where earthquake induced ground vibrations increase the pore
pressure in saturated, granular soils until it is equal to the confining, overburden pressure. When
this occurs, the soil can completely lose its shear strength and become liquefied. The possibility of
liquefaction is dependent upon grain size, relative density, confining pressure, saturation of the
soils, and strength of the ground motion and duration of ground shaking. In order for liquefaction
to occur three criteria must be met: underlying loose, coarse-grained (sandy) soils, a groundwater
depth of less than about 50 feet and a nearby large magnitude earthquake. Given the relatively
dense nature of the subsurface soils, and the absence of a groundwater table, the potential for
liquefaction at the site is considered to be negligible.
2.06 LANDSLIDES
Evidence of ancient landslides was not found at the subject site. Recommendations are provided in
the following sections of the report which will help to reduce the potential for future slope
instabilities.
2.07 TSUNAMI AND SEICHE HAZARD
The site is not located within an area mapped by the California Geological Survey as subject to
inundation by tsunami. Given the location of the site at an elevation of approximately 155 feet ms!,
the inundation hazard posed by tsunami is considered to be low. Seiches are not considered to be a
hazard due the absence of above-ground tanks or reservoirs located immediately up gradient from
the site.
Page 6 of 22
5 Fcnis S4uare. Suite C
San Diego, CA 92 l 21
(858) 537-3999
-----
-----... --
• -..
-..
...
...
-----
•
... .. ..
•
• -.. --..
Hilton Tapestry Resort Expansion -Geotechnical Investigation
Carlsbad. California
3.00 CONCLUSIONS
3.01 GENERAL CONCLUSIONS
MTGL Project No. 1916Al2
MTGLLogNo. 17-1619
Given the findings of the investigation. it appears that the site geology is suitable for the proposed
construction. Based on the investigation, it is our opinion that the proposed development is safe
against landslides and settlement provided the recommendations presented in our report are
incorporated into the design and construction of the project. Grading and construction of the
proposed project will not adversely affect the geologic stability of adjacent properties. The nature
and extent of the investigation conducted for the purposes of this declaration are, in our opinion, in
conformance with generally accepted practice in this area. Therefore, the proposed project appears
to be feasible from a geologic standpoint. There appears to be no significant geologic constraint
onsite that cannot be mitigated by proper planning, design, and sound construction practices.
Specific conclusions pertaining to geologic conditions are summarized below:
• Due to proximity of the site to regional active and potentially active faults, the site could
experience moderate to high levels of ground shaking from regional seismic events within
the projected life of the building. A design performed in accordance with the current
California Building Code and the seismic design parameters of the Structural Engineers
Association of California is expected to satisfactorily mitigate the effects of future ground
shaking .
• The potential for active (on-site) faulting is considered low .
• The potential for liquefaction during strong ground motion is considered low .
• The potential for landslides to occur is considered low if the remedial recommendations
presented herein are incorporated.
• The on-site fill materials are considered not suitable for structural support in their present
condition. Recommendations are presented in the following sections for remedial grading
at the site.
• The proposed structures may be supported by a conventional shallow foundation system if
the undocumented fill materials are mitigated as recommended .
3.02 EARIBQUAKE ACCELERATIONS \CBC SEISMIC PARAMETERS
The 2016 California Building Code seismic design parameters were obtained from the USGS
website using a project location of latitude 33.124° North and a longitude of 117.314° West. Based
upon the anticipated grading requirements at the site a Site Class C was used for the project. The
2016 Seismic Design Parameters are presented below:
Page 7 of22
5 Fenis S4uare, Suite C
San Diego, CA 92121
(858) 537-3999
Hilton Tapestry Resort Expansion -Geotechnical Investigation
Carlsbad, California
Ground Motion Value Parameter
Ss 1.135g
S1 0.437g
Site Class C
SMs 1.135g
SM1 0.595g
Sos 0.757g
Soi 0.397g
3.03 EXPANSION POTENTIAL
MTGL Project No. 1916Al2
MTGL Log No. 17-1619
While not encountered in our investigation, there is a potential or highly expansive claystone
materials to be encountered within the Santiago Formation. The claystones have a very high
expansion potential and are not considered suitable for support of any new loads.
Recommendations are provided in this report for mitigation of these highly expansive clayey
materials if they are encountered. The fill materials observed at the site have a very low expansion
potential and are considered suitable for use as engineered fill.
Page 8 of 22
6295 Fem; S4uare. Suite C
San Diego, CA 92121
(858) 537-3999
..
• .. ..
..
• ..
• -
• ..
• .. .. ..
• -..
--.. -..
• .. --.. ..
·• ..
---..
--
Hilton Tapestry Resort Expansion -Geotechnical Investigation
Carlsbad. California
4.00 RECOMMENDATIONS
MTGL Project No. 1916A12
MTGL Log No. 17-1619
Our recommendations are considered minimum and may be superseded by more conservative
requirements of the architect, structural engineer, building code, or governing agencies. The
foundation recommendations are based on the expansion index and shear strength of the onsite
soils. Import soils, if necessary should have a very low expansion potential (Expansion Index less
than 20) and should be approved by the Geotechnical Engineer prior to importing to the site. In
addition to the recommendations in this section, additional general earthwork and grading
specifications are included in Appendix E .
4.0 I EXCAVATION CHARACTERISTICS/SHRINKAGE
Our exploratory borings were advanced with little difficulty within the fill soils and no oversize
materials were encountered in our subsurface investigation. Our exploratory borings were
advanced with some effort within the weakly to moderately cemented formational materials.
Accordingly, we expect that all earth materials will be rippable with conventional heavy-duty
grading equipment with experienced operators and that oversized materials are not expected .
Shrinkage is the decrease in volume of soil upon removal and recompaction expressed as a
percentage of the original in-place volume, which will account for changes in earth volumes that
will occur during grading. Bulking is the increase in volume of soil upon removal recompaction
expressed as a percentage of the original in-place volume. Our estimate for shrinkage of the onsite
fill soils are expected to range from 5 to 10 percent. Our estimate for bulking of the formational
materials is estimated to range from 5 to IO percent. It should be noted that bulking and shrinkage
potential can vary considerably based on the variability of the in-situ densities of the materials in
question .
4.02 SETTLEMENT CONSIDERATIONS
Based on the proposed grading recommendations, we anticipate that properly designed and
constructed foundations that are supported on compacted fill materials will experience a total static
settlement of up to 1.0 inch with differential settlements of ½ an inch. As a minimum, structures
supported by shallow conventional foundations should be designed to accommodate a total
settlement of at least 1.0 inch with differential settlements of½ an inch over a horizontal distance of
40 feet.
Page 9 of 22
5 Fenis S4uarc, Suite C
San Diego, CA 92121
(858) 537-3999
·-.. .. ..
-..
-
• .. ..
-
•
..
.. .. --
·• ..
·• ..
• .. ..
-.. .. -.. .. .. ..
-
"'" -..
Hilton Tapestry Resort Expansion -Geotechnical Investigation
Carlsbad, California
4.03 SITE CLEARING RECOMMENDATIONS
MTGL Project No. 1916A12
MTGLLogNo.17-1619
All surface vegetation, trash, debris, asphalt concrete, portland cement concrete and underground
pipes should be cleared and removed from the proposed construction site. Underground facilities
such as utilities may exist at the site. Depressions resulting from the removal of foundations of
existing buildings, buried obstructions and/or tree roots should be backfilled with properly
compacted material. All organics, debris, trash and topsoil should be removed from the grading
area and hauled offsite.
4.04 SITE GRADING RECOMMENDATIONS -STRUCTURES
Remedial grading for new building at the site should include removal of all previously placed fills
to expose undisturbed formational materials (Old Paralic Deposits, Unit 2-4). Based on
information from the borings, removals may extend to about 8½ feet below existing grade. The
bottom of the removals should then be evaluated by the geotechnical engineer or geologist to see if
further remedial grading is warranted. The horizontal limits of the removals should extend to at
least 5 feet beyond the building footprint.
Once formational materials have been exposed and approved, the undocumented fill materials ( with
an expansion index of less than 50 and with no deleterious materials) may be placed as compacted
fill. Prior to fill placement, the exposed excavation bottom should be scarified to a depth of 8 to 12
inches, moisture conditioned and re-compacted. The materials should be compacted to at least 90
percent of the maximum dry density as determined by ASTM Test Method D1557 at a moisture
content that is slightly above optimum moisture content.
If encountered, the highly expansive claystone materials of the Santiago Formation should not
underlie new structures. Remedial grading should include complete removal of all expansive
claystone materials beneath the structure. The claystone materials should be properly disposed of
off-site .
Page 10 of22
5 Fenis Square, Suite C
San Diego, CA 92121
(858} 537-3999
• ..
• ..
•
• .. .. ..
• .. .. .. .. .. .. .. ..
-..
---• ..
,.
.. .. .. -.. .. ..
.. ..
-..
Hilton Tapestry Resort Expansion -Geotechnical Investigation
Carlsbad. California
4.05 SITE GRADING RECOMMENDATIONS CUT/FILL TRANSIDON
MTGL Project No. 1916A12
MTGLLogNo.17-1619
After remedial grading to remove all previously placed fill has been performed, there is a potential
within the building footprint to have a transition where footings rest both on undisturbed
formational materials and compacted fill. This 'cut/fill' transition could result in adverse
differential settlement. To mitigate the cut/fill transition we recommend that the formational
deposits within the cut portion of the building pad be over-excavated to a depth equal to one-half of
the maximum fill depth (but not less than 3 feet) of the fill portion of the building pad. The depths
are those measured from the bottom of the proposed footings. The over-excavated cut soils may
then be placed as compacted fill. The purpose of the cut/fill mitigation is to provide a uniform fill
mat of at least three (3) feet beneath all of the footings .
4.06 SITE GRADING RECOMMENDATIONS HARDSCAPE
Hardscape areas should have the upper two (2) feet of previously placed fills removed and re-
compacted as engineered fill. If dense formational materials are encountered prior to reaching the
two feet, then the over-excavation may be terminated at the dense formational materials. Prior to
re-compaction of soils, the exposed excavation bottom should be scarified to at least 8 to 12 inches,
moisture conditioned, and compacted. The materials should be compacted to a minimum of 90
percent of the maximum density at a moisture content that is slightly above optimum. Processing
for hardscape areas should extend a minimum of two (2) feet outside the hardscape limits.
4.07 COMPACTION REQUIREMENTS
All fill materials should be compacted to at least 90 percent of maximum dry density as determined
by ASTM Test Method D 1557. Fill materials should be placed in loose lifts, no greater than 8
inches prior to applying compactive effort. All engineered fill materials should be moisture-
conditioned and processed as necessary to achieve a uniform moisture content that is slightly above
optimum moisture content and within moisture limits required to achieve adequate bonding
between lifts .
4.08 FILLMATERIALS
Removed and/or over-excavated soils may be reused as engineered fill except for expansive soils
( expansion index greater than 50) and soils containing detrimental amounts of organic material,
trash and other debris .
Page 11 of22
5 Fenis S4uarc, Suite C
San Diego, CA 92 I :! 1
(858J s:n~J999
-
-
--
•
---..
-..
---..
-
---
• ---.. .. ..
---..
Hilton Tapestry Resort Expansion -Geotechnical Investigation
Carlsbad, California
MTGL Project No. 1916Al2
MTGL Log No. 17-1619
hnported materials shall be free from vegetable matter and other deleterious substances, shall not
contain rocks or lumps of a greater dimension than 4 inches, shall have an expansion index of less
than 20, and shall be approved by the geotechnical consultant. Soils of poor gradation, expansion,
or strength properties shall be removed off-site.
4.09 SLOPES
Grading at the site may include construction of a minor fill slope. We recommend that slopes be
inclined no steeper than 2: 1 (horizontal to vertical). Fills over sloping ground should be
constructed entirely on prepared bedrock. In areas where the existing ground surface slopes at more
than a 5: 1 gradient, it should be benched to produce a level area to receive the fill. Benches should
be wide enough to provide complete coverage by the compaction equipment during fill placement.
Slopes constructed at 2: 1 or flatter should be stable with regard to deep seated failure with a factor
of safety greater than 1.5, which is the generally accepted safety factor. However, all slopes are
susceptible to surficial slope failure and erosion, given substantial wetting of the slope face.
Surficial slope stability may be enhanced by providing proper site drainage. The site should be
graded so that water from the surrounding areas is not able to flow over the top of the slopes.
Diversion structures should be provided where necessary. Surface runoff should be confined to
gunite-lined swales or other appropriate devises to reduce the potential for erosion. It is
recommended that slopes be planted with vegetation that will increase their stability. Ice plant is
generally not recommended .
4.10 FOUNDATIONS
The recommendations and design criteria are "minimum" in keeping with the current standard-of-
practice. They do not preclude more restrictive criteria by the governing agency or structural
considerations. The project structural engineer should evaluate the foundation configurations and
reinforcement requirements for actual structural loadings. The foundation design parameters
assume that remedial grading is conducted as recommended in this report, and that all the buildings
are underlain by a relatively uniform depth of compacted fill with a low expansion potential
(Expansion Index less than 50).
Conventional shallow foundations are considered suitable for support of the proposed structure
provided that remedial grading to remove undocumented fill materials and mitigation of cut/fill
transitions are performed .
Page 12 of22
5 Fcnis Square, Suite C
San Diego, CA 92121
(858) 5:17-3999
------
--
---
-----
------
• ..
• .. ..
-..
----
Hilton Tapestry Resort Expansion -Geotechnical Investigation
Carlsbad. California
MTGL Project No. 1916Al2
MTGLLogNo. 17-1619
Allowable Soil Bearing:
Minimum Footing Width:
Minimum Footing Depth:
Coefficient of Friction:
Passive Pressure:
3,000 lbs/ft2 (allow a one-third increase for short-term wind
or seismic loads). The allowable soil bearing may be
increase 500 lbs/ft2 for every 12-inch increase in depth above
the minimum footing depth and 250 lbs/ft2 for every 12-inch
increase in width above the minimum footing width. The
bearing value may not exceed 5,000 lbs/ft2
24 inches
24 inches below lowest adjacent soil grade
0.35
350 psf per foot of depth. Passive pressure and the friction
of resistance could be combined without reduction
4.11 CONCRE1E SLABS ON GRADE AND MISCELLANEOUS FLATWORK
Interior slab-on-grade should be designed for the actual applied loading conditions expected. The
structural engineer should size and reinforce slabs to support the expected loads utilizing accepted
methods of concrete design, such as those provided by the Portland Cement Association or the
American Concrete Institute. A modulus of subgrade reaction of 150 pounds per cubic inch (pci)
could be utilized in design. Based on geotechnical consideration, interior slab for conventional
slab-on-grade design should be a minimum of 5 inches and should be reinforced with at least No. 4
bars on I 8 centers, each way. Actual reinforcement should be designed by the project structural
engineer based upon medium expansion potential. Structural slabs should be designed by the
structural engineer and should span from foundation supports.
Concrete slabs constructed on soil ultimately cause the moisture content to rise in the underlying
soil. This results from continued capillary rise and the termination of normal evapotranspiration.
Because normal concrete is permeable, the moisture will eventually penetrate the slab. Excessive
moisture may cause mildewed carpets, lifting or discoloration of floor tiles, or similar problems .
To decrease the likelihood of problems related to damp slabs, suitable moisture protection measures
should be used where moisture sensitive floor coverings, moisture sensitive equipment, or other
factors warrant.
A commonly used moisture protection in southern California consists of about 2 inches of clean
sand covered by at least 10 mil plastic sheeting. In addition, 2 inches of clean sand are placed over
the plastic to decrease concrete curing problems associated with placing concrete directly on an
impermeable membrane. However, it has been our experience that such systems will transmit from
Page 13 of22
5 Fcnis S4uarc. Suite C
San Diego, CA 92 ! 21
(858J s:n.J999
---
--
-----... -..
,.
.. ..
----------.. .. .. .. .. ..
-
, ..
--
Hilton Tapestry Resort Expansion -Geotechnical Investigation
Carlsbad. California
MTGL Project No. 1916A12
MTGLLogNo.17-1619
approximately 6 to 12 pounds of moisture per 1,000 square feet per day. This may be excessive for
some applications, particularly for sheet vinyl, wood flooring, vinyl tiles, or carpeting with
impermeable backing that use water soluble adhesives. If additional moisture protection is needed,
then a Stego Wrap moisture barrier, or equivalent, may be used in lieu of 10 mil plastic sheeting.
The Stego Wrap should be installed per the manufacturers' recommendations.
Concrete is a rigid brittle material that can withstand very little strain before cracking. Concrete,
particularly exterior hardscape is subject to dimensional changes due to variations in moisture of the
concrete, variations in temperature and applied loads. It is not possible to eliminate the potential for
cracking in concrete; however, cracking can be controlled by use of joints and reinforcing. Joints
provide a pre-selected location for concrete to crack along and release strain and reinforcement
provides for closely spaced numerous cracks in lieu of few larger visible cracks. Crack control
joints should have a maximum spacing of 5 feet for sidewalks and 10 feet each way for slabs .
Differential movement between buildings and exterior slabs, or between sidewalks and curbs may
be decreased by doweling the slab into the foundation or curb.
Exterior concrete slabs on the expansive site soils may experience some movement and cracking .
Exterior slabs should be at least 4 inches thick and should be reinforce with at least 6x6,
W2.9/W2.9 welded wire fabric or No. 4 bars spaced at 18 inches on center, each way, supported
firmly at mid-height of the slab.
4.12 PREWETIINGRECOMMENDATION
The soils underlying the slab-on-grade should be brought to a minimum of 2% and a maximum of
4% above their optimum moisture content for a depth of 12 inches prior to the placement of
concrete. The geotechnical consultant should perform insitu moisture tests to verify that the
appropriate moisture content has been achieved a maximum of 24 hours prior to the placement of
concrete or moisture barriers.
4.13 Corrosivity
Corrosion series tests consisting of pH, soluble sulfates, soluble chlorides, and minimum resistivity
were performed on selected samples of the on-site soils. Soluble sulfate levels for the on-site fill
soils indicate a negligible sulfate exposure for concrete structure. As such, no special
considerations are required for concrete placed in contact with the on-site soils. However, it is
recommended that Type II cement to be used for all concrete .
Page 14 of 22
'.) Penis Square. Suite C
San Diego, CA 92121
(858) 537-3999
Hilton Tapestry Resort Expansion -Geotechnical Investigation
Carlsbad, Califo rnia
MTGL Project No. 1916A 12
MTGL Log No. 17-16 19
Based on the soluble chloride levels the on-site soils have a degree of corrosivity to metals that is
negligible. Based on the pH and Resistivity, the on-site soils have a degree of corrosivity to fe rrous
metals that is corrosive. The actual corrosive potential is determined by many factors in addition to
those presented herein. MTGL, Inc. does not practice corrosion engineering. Underground metal
conduits in contact with the soil need to be protected. We recommend that a corrosion engineer be
consul ted.
4.14 RETAJNING WALLS
Embedded structural walls should be designed for lateral earth pressures exerted on the walls. The
magnitude of these earth pressures will depend on the amount of deformation that the wall can yield
under the load. If the wall can yield sufficiently to mobilize the full shear strength of the soils, it
may be designed for the active condition. If the wall cannot yield under the applied load, then the
shear strength of the soil cannot be mobilized and the earth pressures will be higher. These walls
such as basement walls should be designed for the at rest condition. If a structure moves towards
the retained soils, the resul ting resistance developed by the soil will be the passive resistance.
For design purposes, the recommended equivalent fluid pressure for each case for walls constructed
above the static groundwater table, backfilled with low expansive soils, and where remedial grading
has been performed is provided below. Retainjng wall backfill should be compacted to at least
90% relative compaction based on the maximum density defined by ASTM D1 557. Retaining
structures may be designed to resist the following lateral earth pressures.
• Allowable Bearing Pressure -3,000 psf
• Coefficient of Friction (Soil to Footing) -0.35
• Passive Earth Pressure -equivalent fluid weight of 300 pcf
(Maximum of 2,000 pcf)
• At rest lateral earth pressure -60 pcf
• Acti ve Earth Pressures -equivalent fluid weights:
Slope of Retained Equivalent Fluid Weight
Material (pct)
Level 40
2: l (H:V) 55
Page 15 of 22
6295 Fenis S4uare. Suite C
San Diego. CA 921 :! I
(858) 537-3999
.. ..
..
•
•
•
• -..
-
• .. --
• .. ..
-..
-
• .. -..
• -..
• -
• -..
-..
-..
Hilton Tapestry Resort Expansion -Geotechnical Investigation
Carlsbad, California
MTGLProjectNo.1916A12
MTGL Log No. 17-1619
It is recommended that all retaining wall footings be embedded at least 24 inches below the lowest
adjacent finish grade. In addition, the wall footings should be designed and reinforced as required
for structural considerations .
Lateral resistance parameters provided above are ultimate values. Therefore, a suitable factor of
safety should be applied to these values for design purposes. The appropriate factor of safety will
depend on the design condition and should be determined by the project Structural Engineer. If
any super-imposed loads are anticipated, this office should be notified so that appropriate
recommendations for earth pressures may be provided .
Retaining structures should be drained to prevent the accumulation of subsurface water behind the
walls. Back drains should be installed behind all retaining walls exceeding 3.0 feet in height. A
typical detail for retaining wall back drains is presented as Figure 3. All back drains should be
outlet to suitable drainage devices. Walls and portions thereof that retain soil and enclose interior
spaces and floors below grade should be waterproofed and damp-proofed in accordance with the
2016 CBC .
For retaining walls exceeding 6 feet in height we recommend that a seismic retaining wall design be
conducted by the structural engineer. For seismic design we used a peak site acceleration of 0.45g
calculated from the modified seismic design parameters (Ss/2.5). For a retained wall condition,
such as the planned basement levels, we recommend a seismic load of 18H be used for design. The
seismic load is dependent of the retained wall height where H is the height of the wall, in feet, and
the calculated triangular loads result in pounds per square foot exerted at the base of the wall and
zero at the top of the wall.
4.15 FOUNDATION SETBACKS
As a minimum, structural foundations should be setback from any descending slope at least 8 feet.
Screen-wall foundations should have a minimum setback of 5 feet. The setback should be
measured horizontally from the bottom outside edge of the footing to the slope face. The horizontal
setback can be reduced by deepening the foundation to achieve the recommended setback distance
projected from the footing bottom to the slope face. It should be recognized that the outer few feet
of all slopes are susceptible to gradual down-slope movements due to slope creep. This will affect
hardscape such as concrete slabs. We recommend that settlement sensitive structures, including
concrete slabs, not be constructed within 5 feet of the slope top without a specific review by the
geotechnical consultant.
Page 16 of22
5 Fcnis Square. Suite C
San Diego, CA 9212 J
(8.'i8) 517-3999
..
11 .. .. ..
•
• ..
-
• ..
• .. .. .. ..
..
,.
-
-
-
•
• -
• .. .. .. ..
-
Hilton Tapestry Resort Expansion -Geotechnical Investigation
Carlsbad, California
MTGLProjectNo.1916Al2
MTGLLogNo. 17-1619
Utility trenches, swimming pools, and biorentention basins that are adjacent to foundations should
not extend into the footing influence zone defined as the area within a line projected at a I: 1
(horizontal to vertical) drawn from the bottom edge of the footing .
4.16 Bro RETENTION BASIN
Any bio retention basin proposed for the site should be designed by the project civil engineer using
the information presented in this report. We recommend that the bio retention basin be lined with
an impermeable barrier on the sides and bottom to prevent any water from migrating laterally into
the foundations of the existing structures or onto the existing descending slope. A subdrain should
be provided beneath the basin. Prior to discharge into the storm drain pipe, a seepage cutoff wall
should be constructed at the interface between the subdrain and storm drain pipe. The concrete
cutoff wall should extend a minimum of 6 inches beyond the perimeter of the gravel packed
subdrain system .
We performed two percolation tests at the site. The percolation tests were conducted in the
undocumented fill soils that exist on the site. Remedial grading has been recommended which
would result in the news fill soils being denser than the existing fills and subsequently less
permeable. The Old Paralic Deposits which exist beneath the fill soils are not permeable. Because
of these conditions we do not consider the site suitable for infiltration of storm water runoff.
4.17 CONS'IRUCTION CONSIDERATIONS
4.17 .1 MOISTURE SENSIDVE Son,s/WEATIIER RELATED CONCERNS
The upper soils encountered at this site may be sensitive to disturbances caused by construction
traffic and to changes in moisture content. During wet weather periods, increases in the
moisture content of the soil can cause significant reduction in the soil strength and its support
capabilities. In addition, soils that become excessively wet may be slow to dry and thus
significantly delay the progress of the grading operations. Therefore, it will be advantageous to
perform earthwork and foundation construction activities during the dry season. Much of the
on-site soils may be susceptible to erosion during periods of inclement weather. As a result, the
project Civil Engineer/Architect and Grading Contractor should take appropriate precautions to
reduce the potential for erosion during and after construction .
Page 17 of22
5 Ferris Sq_uare. Suite C
San Diego, CA 92121
(858) 537-.3999
-.. .. ..
-
-
• -
• .. ..
-..
,. ..
.. --
• -
• -..
•
•
•
•
•
•
•
-..
-
Hilton Tapestry Resort Expansion -Geotechnical Investigation
Carlsbad. California
4.17 .2 DRAINAGE AND GROUNDWATER CONSIDERATIONS
MTGLProjectNo. 1916A12
MTGL Log No. 17-1619
Groundwater was not encountered in the borings drilled for this investigation. It should be
noted, however, that variations in the ground water table may result from fluctuation in the
ground surface topography, subsurface stratification, precipitation, irrigation, and other factors
that may not have been evident at the time of our exploration. Seepage sometimes occurs
where relatively impermeable and/or cemented formational materials are overlain by fill soils .
We should be consulted to evaluate areas of seepage during construction .
Water should not be allowed to collect in the foundation excavation, on floor slab areas, or on
prepared subgrades of the construction area either during or after construction. Undercut or
excavated areas should be sloped to facilitate removal of any collected rainwater, groundwater,
or surface runoff. Positive site drainage should be provided to reduce infiltration of surface
water around the perimeter of the building and beneath the floor slabs. The grades should be
sloped away from the building and surface drainage should be collected and discharged such
that water is not permitted to infiltrate the backfill and floor slab areas of the building .
4.17.3 TEMPORARY EXCAVATIONS AND SHORING
Short term temporary excavations in existing soils may be safely made at an inclination of 1: 1
(horizontal to vertical) or flatter. If vertical sidewalls are required in excavations greater than 3
feet in depth, the use of cantilevered or braced shoring is recommended. Excavations less than
3 feet in depth may be constructed with vertical sidewalls without shoring or shielding. Our
recommendations for lateral earth pressures to be used in the design of cantilevered and/or
braced shoring are presented below. These values incorporate a uniform lateral pressure of 72
psf to provide for the normal construction loads imposed by vehicles, equipment, materials, and
workmen on the surface adjacent to the trench excavation. However, if vehicles, equipment,
materials, etc. are kept a minimum distance equal to the height of the excavation away from the
edge of the excavation, this surcharge load need not be applied .
Page 18 of 22
5 Ferris Square, Suite C
San Diego, CA 92121
(858) 517-3999
--
--..
.. ..
-
-
.. .. ..
• -
-
--
•
,.
-
• --
Hilton Tapestry Resort Expansion -Geotechnical Investigation
Carlsbad, California
MTGL Project No. 1916Al2
MTGLLogNo.17-1619
H
P ~ 30 H nsf 72 nsf P =25H sf
P Total -72 psi+ 30 H psi P Total= 72 sf+ 25 H s!
SHORING DESIGN: LATERAL SHORING PRESSURES
Design of the shield struts should be based on a value of 0.65 times the indicated pressure, Pa,
for the approximate trench depth. The wales and sheeting can be designed for a value of 2/3 the
design strut value.
STRUTS
(lyp.)
SHIELD
(typ.)
UNDISTURBED
SOIL
BEDDING Pa = 30 H'" psi
HEIGHT OF SHIELD, H,h = DEPTH OF TRENCH, D1 , MINUS DEPTH OF SLOPE, H1
TYPICAL SHORING
DETAIL
Placement of the shield may be made after the excavation is completed or driven down as the
material is excavated from inside of the shield. If placed after the excavation, some over-
excavation may be required to allow for the shield width and advancement of the shield. The
shield may be placed at either the top or the bottom of the pipe zone. Due to the anticipated
thinness of the shield walls, removal of the shield after construction should have negligible
effects on the load factor of pipes. Shields may be successively placed with conventional
trenching equipment.
Page 19 of 22
5 Penis Square. Suite C
San Diego, CA 92121
(858J 537-W99
-
-
-
--
..
---..
---
-
-
M
-
------
-
-
Hilton Tapestry Resort Expansion -Geotechnical Investigation
Carlsbad, California
MTGL Project No. 1916Al2
MTGL Log No. 17-1619
Vehicles, equipment, materials, etc. should be set back away from the edge of temporary
excavations a minimum distance of 15 feet from the top edge of the excavation. Surface waters
should be diverted away from temporary excavations and prevented from draining over the top
of the excavation and down the slope face. During periods of heavy rain, the slope face should
be protected with sandbags to prevent drainage over the edge of the slope, and a visqueen liner
placed on the slope face to prevent erosion of the slope face.
Periodic observations of the excavations should be made by the geotechnical consultant to
verify that the soil conditions have not varied from those anticipated and to monitor the overall
condition of the temporary excavations over time. If at any time during construction conditions
are encountered which differ from those anticipated, the geotechnical consultant should be
contacted and allowed to analyze the field conditions prior to commencing work within the
excavation. All Cal/OSHA construction safety orders should be observed during all
underground work.
4.17.4 UTILITYTRENCHES
All Cal/OSHA construction safety orders should be observed during all underground work. All
utility trench backfill within street right of way, utility easements, under or adjacent to
sidewalks, driveways, or building pads should be observed and tested by the geotechnical
consultant to verify proper compaction. Trenches excavated adjacent to foundations should not
extend within the footing influence zone defined as the area within a line projected at a 1: 1
(horizontal to vertical) drawn from the bottom edge of the footing. Trenches crossing
perpendicular to foundations should be excavated and backfilled prior to the construction of the
foundations. The excavations should be backfilled in the presence of the geotechnical engineer
and tested to verify adequate compaction beneath the proposed footing.
Utilities should be bedded and backfilled with clean sand or approved granular soil to a depth of
at least I-foot over the pipe. The bedding materials shall consist of sand, gravel, crushed
aggregate, or native, free draining soils with a sand equivalence of not less than 30. The
bedding should be uniformly watered and compacted to a firm condition for pipe support.
The remainder of the backfill shall be typical on-site soil or imported soil which should be
placed in lifts not exceeding 8 inches in thickness, watered or aerated to near optimum moisture
content, and mechanically compacted to at least 90% of maximum dry density (ASTM D1557).
Page 20 of 22
5 Ferris S<.juare, Suite C
San Diego, CA 92121
(858) 537-3999
---
----
--
-
--
--
-..
..
-
---
-
Hilton Tapestry Resort Expansion -Geotechnical Investigation
Carlsbad, California
4.17.5 SITE DRAINAGE
MTGL Project No. 19l6A12
MTGLLogNo. 17-1619
The site should be drained to provide for positive drainage away from structures in accordance
with the building code and applicable local requirements. Unpaved areas should slope no less
than 2% away from structure. Paved areas should slope no less than 1 % away from structures.
Concentrated roof and surface drainage from the site should be collected in engineered, non-
erosive drainage devices and conducted to a safe point of discharge. The site drainage should
be designed by a civil engineer.
4.18 GEOTECHNICAL OBSERV A TI ON/TESTING OF EARTHWORK OPERA TIO NS
The recommendations provided in this report are based on preliminary design information and
subsurface conditions as interpreted from the investigation. Our preliminary conclusion and
recommendations should be reviewed and verified during site grading, and revised accordingly if
exposed Geotechnical conditions vary from our preliminary findings and interpretations. The
Geotechnical consultant should perform Geotechnical observation and testing during the following
phases of grading and construction:
• During site grading and over-excavation.
• During foundation excavations and placement.
• Upon completion of retaining wall footing excavation prior to placing concrete.
• During excavation and backfilling of all utility trenches
• When any unusual or unexpected Geotechnical conditions are encountered during any
phase of construction.
Page 21 of 22
5 Ferrif> S4uarc. Suite('
San Dicgn, CA 92121
(858) 537-3999
---
-
-
-..
-.. ..
•
---
.... .. ..
---------
-..
Hilton Tapestry Resort Expansion -Geotechnical Investigation
Carlsbad, California
5.00 LIMITATIONS
MTGL Project No. 1916Al2
MTGLLogNo.17-1619
The findings, conclusions, and reconuuendations contained in this report are based on the site
conditions as they existed at the time of our investigation, and further assume that the subsurface
conditions encountered during our investigation are representative of conditions throughout the site.
Should subsurface conditions be encountered during construction that are different from those
described in this report, this office should be notified inuuediately so that our reconuuendations
may be re-evaluated.
This report was prepared for the exclusive use and benefit of the owner, architect, and engineer for
evaluating the design of the project as it relates to geotechnical aspects. It should be made available
to prospective contractors for information on factual data only, and not as a warranty of subsurface
conditions included in this report.
Our investigation was performed using the standard of care and level of skill ordinarily exercised
under similar circumstances by reputable soil engineers and geologists currently practicing in this or
similar localities. No warranty, express or implied, is made as to the conclusions and professional
advice included in this report .
This firm does not practice or consult in the field of safety engineering. We do not direct the
Contractor's operations, and we are not responsible for their actions. The contractor will be solely
and completely responsible for working conditions on the job site, including the safety of all
persons and property during performance of the work. This responsibility will apply continuously
and will not be limited to our normal hours of operation .
The findings of this report are considered valid as of the present date. However, changes in the
conditions of a site can occur with the passage of time, whether they are due to natural events or to
human activities on this or adjacent sites. In addition, changes in applicable or appropriate codes
and standards may occur, whether they result from legislation or the broadening of knowledge.
Accordingly, this report may become invalidated wholly or partially by changes outside our control.
Therefore, this report is subject to review and revision as changed conditions are identified.
Page 22 of 22
:'i Ft!rris Square. Suite C
San Dkgn, CA 92121
(858) 537-3999
-
-..
-
FIGURES
-
-
-
-..
-
•
...
,.
..
• .. ..
-..
l'.\ND
1ilfiger
arlsbad Outlet
\nn Taylor
,zumiez
Rubio s Coastal Grill
cks
B
El
,vron 6
\irport Rd
-0
Cl)
lands en Cl)
0
CJ ~
3e11 G) z 0
;1
(I)
The Flower
Fields
~
Palomar Airport Rd
0 Carl s Jr
7-Eleven
Q
State of California
Maintenance Stations
REFERENCE: Google Maps, November 17, 2017.
1vn;1"11 ,~ n 1u.:,t\..
6 e
Wok 'N' Bowl Ramen
~
G,
Karl Strauss
Brewing Com ny
Dino Island
" SEA LIFE Aquariur
Grand Pacific A
Palisades Resort & ., ' ct> (.Q
0
Cl ::,
0.
~
SITE
Palomar Airport Rd @ill
@ill Palomar Airport Rd E1
Wells Fargo Bank 0
starbucks
Go g le
c
ro "O
(0
§
<(
• ,
---• ' ,
~ NOSCALE
SITE LOCATION PLAN
PROJECT NO. 1916A12
MTGL, INC Log No. 17-1619
FIGURE 1
EXISllNC 8UILOINC
WISH flOOR = !6aJO
\
1os.
B-2
~ASS AREA~~
lIDill P-2T
MOIi' STRIP
\ ;._B_-1
~AZ Ali'EA\
.P-1 l
£X!SllNC BU/LO/NC
/'!NISH flOOR = !55. !9
1" = 20'
KEY:
~-2 ~ Boring Number and approximate location
•
P-1
REFERENCE: Topographic Survey provided by Excel Engineering, dated
September 1, 2017.
Percolation Number and approximate location
SITE PLAN
PROJECT NO. 1916A12
MTGL, INC Log No. 17-1619
FIGURE 2
---.. .. ..
--..
• -.. .. --..
...
--
-----..
----
Hilton Tapestry Resort Expansion -Geotechnical Investigation
Carlsbad. California
MTGL Project No. 1916Al2
MTGLLogNo. 17-1619
Retaining wall
Wall waterproofing
per architect's
specifications
Provide open cell head
joints or outlet drain at
50 feet on center to a ~
suitable drainage device ""'
Finished Grade
Compacted fill
Wall footing
SPECIFICATIONS FOR CLASS 2
PERMEABLE MATERIAL
(CAL TRANS SPECIFICATIONS)
Sieve Size % Passing
1" 100
3/4" 90-100
3/8" 40-100
No.4 25-40
No.8 18-33
No.30 5-15
No.SO 0-7
No.200 0-3
<1
4
~
<1
4
,¼
0
0
0
0
0
/2
0
0
_o.
Soil backfill, compacted to
90% relative compaction*
Filter fabric envelope
(Mirafi 140N or approved
equivalent) ••
Minimum of 1 cubic foot
per linear foot of 3/4"
crushed rock
~--3" diameter perforated
PVC pipe (schedule 40 or
equivalent) with perforations
oriented down as depicted
minimum 1 % gradient to
suitable outlet.
* Based on ASTM D1557
0 If class 2 permeable material (See
gradation to left) is used in place of
3/4" -1 1/2" gravel. Filter fabric may
be deleted. Class 2 permeable material
compacted to 90% relative compaction. •
RETAINING WALL DRAINAGE DETAIL
Figure 3
5 Fenis Square, Suite C
San Diego, CA 9212 !
(858) 537-.1999
---
"" ------..
• -..
-..
APPENDIX A --REFERENCES
-
-
-..
-... .. ..
-
----.. ..
--
..
-
-
-
--
------
•
---..
-
---
-
-
--
Hilton Tapestry Resort Expansion -Geotechnical Investigation
Carlsbad. California
APPENDIX A
REFERENCES
MTGLProjectNo. 1916A12
MTGL Log No. 17-1619
Anderson, J.G., Rockwell, T.K., Agnew, D.C (1989). Past and Possible Future Earthquakes of
Significance to the San Diego Region, Earthquake Spectra, Vol. 4, No. 2, pp 299-335.
California Building Standards Commission (2016). 2016 California Building Code, July 2016.
California Division of Mines and Geology, 1997, Fault-Rupture Hazard Zones in California,
Special Publication 42.
California Emergency Management Agency (2009). Tsunami Inundation Map For Emergency
Planning, Encinitas Quadrangle, June I.
California Geological Survey, 2008, Guidelines for Evaluating and Mitigating Seismic Hazards in
California, Special Publication 117.
Excel Engineering (2017). Topographic Survey, Field Survey Performed August 16, 2017, dated
September I, 2017.
Kennedy, Michael P. and Siang Tan (2005). Geologic Map of the Oceanside 30' x 60' Quadrangle,
California, USGS Digitally Prepared.
Leighton and Associates (1997). Geotechnical Investigation, Proposed Carlsbad Ranch Hotel and
Timeshare Resort, Lot 14 of Tract No. 92-7, Carlsbad Ranch, Carlsbad, California, Project No.
4971101-001, May 5.
Seed, H.B. and Whitman, R.V., 1970, Design of Earth Structures for Dynamic Loads in ASCE
Specialty Conference, Lateral Stresses in the Ground and Design of Earth-Retaining
Structures.
U.S. Geologic Survey (2017). Design Maps Summary Report, http://geohazards.usgs.gov/
U.S. Geologic Survey (2008). 2008 National Seismic Hazard Maps -Source Parameters.
Page A-1 5 Ferri~ Square, Suite C
San Diego, CA 92121
(858) .Y"7-3999
---
-------
..
--APPENDIXB
-FIELD EXPLORATION PROGRAM ..
-..
-.•
---
-
..
----... ..
-••
---
, ..
--.. -----.. -.. --
---..
-..
---..
---
---..
----
Hilton Tapestry Resort Expansion -Geotechnical Investigation
Carlsbad. California
APPENDIXB
FIELD EXPLORATION PROGRAM
MTGLProjectNo. 1916Al2
MTGL Log No. 17-1619
The subsurface conditions for this Geotechnical Investigation were explored by excavating two
exploratory borings. The exploratory borings were excavated using a 6-inch diameter solid-stem-
auger to a maximum depth of 45½ feet below existing grade. The approximate locations of the
borings are shown on the Site Plan (Figure 2). The field exploration was performed under the
supervision of our engineer who maintained a log of the subsurface soils encountered and obtained
samples for laboratory testing. All drive samples were obtained by SPT or California Tube
Sampler.
Subsurface conditions are summarized on the accompanying Logs of Borings. The logs contain
factual information and interpretation of subsurface conditions between samples. The stratum
indicated on these logs represents the approximate boundary between earth units and the transition
may be gradual. The logs show subsurface conditions at the dates and locations indicated, and may
not be representative of subsurface conditions at other locations and times.
Identification of the soils encountered during the subsurface exploration was made using the field
identification procedure of the Unified Soils Classification System (ASTM D2488). A legend
indicating the symbols and definitions used in this classification system and a legend defining the
terms used in describing the relative compaction, consistency or firmness of the soil are attached in
this appendix. Bag samples of the major earth units were obtained for laboratory inspection and
testing, and the in-place density of the various strata encountered in the exploration was determined
The exploratory borings were located in the field by using cultural features depicted on a
preliminary site plan provided by the client. Each location should be considered accurate only to
the scale and detail of the plan utilized.
The exploratory borings were backfilled in accordance with State of California regulations which
incorporated compacting soil cuttings and bentonite chips.
Page B-1 95 Fcnis Square. Suite C
San Diego. CA 92121
(858J .'B7-3999
Hilton Tapestry Resort Expansion -Geotechnical Investigation
Carlsbad, California
MTGL Project No. 1916Al2
MTGL Log No. 17-1619
UNIFIED SOIL CLASSIFICATION SYSTEM
(1.) GRAVELS Clean Gravels (less GW Well-graded gravels, gravel-sand mixtures.
~ (l'J > are more than half of than 5% fines) Ii ttle or no fines ·-·-(1.) 0 Cl')·-
"'-;;i "' coarse fraction larger Poorly-graded gravels, gravel-sand mixtures, "2 ·c: 8 Gravels with fines GP c B N than #4 sieve little or no fines .§ E ~
SANDS Clean Sands (less Silty Gravels. poorly-graded gravel-(1.) ~c..... c'tS GM :c ~ 0 -5 are more than half of than 5% fines) sand-silt mixtures ·;;; '-N '-
"' --(1.) ·s 0 -oil coarse fraction larger Clayey Gravels, poorly-graded gravel-
(1.) u /I l!l Sands with fines GC u than #4 sieve sand-clay mixtures ·e
"' Well-graded sands, gravelly sands, a. SW
~ little or no fines
(1.) ~ SP Poorly-graded sands, gravelly sands,
E little or no fines V) SIL TS AND CLAYS (1.) V) Silty Sands, poorly-graded sands--5 -;;i Liquid Limit SM -~ ·c: gravel-clay mixtures
(1.) B (1.) Less than 50 > "' > Clayey Sands, poorly-graded sand-(1.) E -~ SC izi .... "' gravel-silt mixtures
-e og Inorganic clays of low to med plasticity. "' ~N ML -0 -'*I: C /I C gravelly, sandy. silty, or lean clays "' ~ V) "' :-;: ..c Inorganic clays of low to med plasticity,
u:i 0 -CL Vl .... gravelly, sandy. silty, or lean clays (1.) :j -0 -(1.) -;;i
8 -~ E OL Organic silts and clays
<d "' of low olasticity N ~-~ ci (1.) SILTS AND CLAYS Inorganic silts, micaceous or diatomaceous z C Liquid Limit MH u: fine sands or silts Greater than 50 Inorganic clays of high plasticity, CH fat clavs
OH Organic silts and clays of medium
to high olasticity
Highly Organic Soils PT Peat. humus swamp soils with
high organic content
GRAIN SIZE SIZE PROPORTION
Descriotion Sieve Size Grain Size Aooroximate Size Trace -Less than 5%
Boulders >12" >12" Larner than basketball-sized Few -5% to I 0%
Cobbles 3"-12" 3"-12" Fist-sized to basketball-sized Little -15% to 20%
Gravel Coarse ¾"-3" ¾"-3" Thumb-sized Some -30% to 45%
Fine #4 -¾" 0.19" -0.75" Peat-sized to thumb-sized Most! y -50% to I 00%
Coarse #10 -#4 0.079" -0.19" Rock salt-sized to oea-sized MOISTURE CONTENT
Sand Medium #40-#10 0.017" -0.079" Sul!ar-sized to rock salt-sized Dry -Absence of moisture
Fine #200 -#40 0.0029" -0.017" Flour-sized to sugar-sized Moist -Damo but not visible
Fines Passing #200 <0.0029" Flour-sized or smaller Wet -Visible free water
CONSISTENCY FINE GRAINED SOILS RELATIVE DENSITY COARSE GRAINED SOILS
Apparent SPT Mod CA Sampler Apparent
Densitv <Blows/Foot) (Blows/Foot) Densitv
Very Soft <2 <3 Very Loose
Soft 2-4 3-6 Loose
Firm 5-8 7-12 Medium Dense
Stiff 9-15 13-25 Dense
Very Stiff 16-30 26-50 Very Dense
Hard >30 >50
Page B-2
SPT
<Blows/Foot)
<4
4-10
11-30
31-50
<50
Mod CA Sampler
<Blows/Foot)
<5
5-12
13-35
36-60
<60
6295 Ferris Square. Suite C
San Diego. CA 92121
(858) 537-3999
BORING NO. 1
Logged by: SEV Date Drilled: 10/30/2017
Method of Drilling: 6-inch diameter solid-stem auger limited access Elevation: 155' msl
I-w w i1:' ;e-;:::-u.. ...J ...J a: a. a. 0 ~
'=-w :1: :iii: !:. w
::c a. < < > a: DESCRIPTION LAB TESTS I-Cl) Cl) Cl) I-::> I-a. == w ~ iii Cl) w 0 > ...J z 5 0 ...J ii: ::> w
III 0 III 0 :1:
Grass: Heavily irrigated.
.... 1 '---FILL: Silty Sand (SM), reddish brown, fine to coarse, moist to wet, medium dense.
Maximum Density &
.... 2
Optimum Moisture,
pH, Resistivity,
... 3
Sulfate, Chloride -
4 16 CAL 123 7.5 ...
... 5
... 6 12 SPT -... 7
... 8 -
9 26 CAL 110 8.8 ... -OLD PARALIC DEPOSITS, Unit 2-4, Undivided (Q0 p2-4): Silty Sandstone 'SM',
.... 10 -orangish brown and gray, fine to coarse grained, moist, weakly to moderately
cemented.
.... 11 28 SPT Slightly clayey. -.... 12
.,_ 13
'-14
'-15 ..__
'-16 47 CAL -113 7.8
.... 17
.... 18
... 19
-20 '---Reddish brown and gray.
.... 21 26 SPT -... 22
-23
.. 24
'-25 ..__
... 26 49 CAL ..__ 110 6.4
.... 27
.... 28
.... 29
.... 30
A 6295 Ferris Square, Suite C
PROJECT NO. 1916A12 SanDiego,CA92121 LOG OF BORING PAGE B-1a
(858) 537-3999
BORING NO.1 (Continued)
Logged by: SEV Date Drilled: 10/30/2017
Method of Drilling: 6-inch diameter solid-stem auger limited access Elevation: 155' msl
I-w w i:L ~ i=' u. ..J ..J a: a. a. 0 ~ !!:. w :ii: :ii: !:. w
::c a. ca: ca: >-a: DESCRIPTION LAB TESTS I-Cl) Cl) Cl) I-::,
a. == w ~ in I-
w ~ Cl)
0 0 ..J z 0 ..J a: ::, w
aJ 0 aJ 0 :;
(Continued)
No. 200 Wash -31 24 SPT OLD PARALIC DEPOSITS, Unit 2-41 Undivided (O0p2-4): Poorly Graded .,__ -32 Sandstone with Silt 'SP-SM', light brown, gray, and yellow, fine to coarse grained,
moist, weakly to moderately cemented.
-33 (7.5% Passing No. 200 Sieve)
-34
... 35 .,__
... 36 52 CAL .,__ 103 8.9
... 37
... 38 -----------------·------·------------------------------------------------------------------------------------
... 39 Silty Sandstone 'SM', reddish brown and gray, fine to coarse grained, moist,
moderately cemented.
-40 .,__
,.... 41 90-11" SPT Gravels. .,__
,.... 42
,.... 43 .,__
SANTIAGO FORMATION (Tsa): Silty Sandstone 'SM', light brown, fine grained, No. 200 Wash
44 80-11½' SPT moist, weakly cemented. /16.3% Passino No. 200 Sieve) ,....
-45
Total Depth: 44 feet
Groundwater not encountered
-46 Backfilled on 10/30/2017
-47
... 48
... 49
... 50
... 51
,.... 52
... 53
... 54
I-55
-56
I-57
... 58
I-59
... 60
A 6295 Ferris Square, Sutte C
PROJECT NO. 1916A12 SanDiego,CA92121 LOG OF BORING PAGE B-1b
L-il i'1~f tilri. (858) 537-3999
BORING NO. 2
Logged by: SEV Date Drilled: 10/31/2017
Method of Drilling: 6-inch diameter solid-stem auger limited access Elevation: 155' msl
I-w w i:L ~ [ u. .J .J a: C. C. 0 a.,
w :: :: !:!:.. w
J: C. <( <( >-a: DESCRIPTION LAB TESTS I-fl) fl) fl) I-:::>
C. 3: w ~ U) I-fl) w 0 > .J z 5 0 .J a: :::> w
ID 0 ID 0 ::
Grass: Heavily irrigated.
... 1 FILL: Silty Sand (SM), brown, fine to coarse, moist to wet, medium dense.
... 2 Expansion Index
3 25 CAL 111 8.9 ... -... 4
5 26 CAL 119 7.2 Direct Shear ... -... 6 -
7 19 CAL 120 9.8 Consolidation ...
,_ 8 ,___ OLD PARALIC DEPOSITS, Unit 2-4, Undivided (Q0 p24): Silty Sandstone 'SM',
mottled reddish brown, yellow, and gray, fine to coarse grained, moist, weakly
9 29 CAL cemented. -,___
... 10 --
... 11 Weakly to moderately cemented.
38 SPT (22.2% Passing No. 200 Sieve) No. 200 wash --... 12
... 13 Slightly clayey.
,_ 14
,_ 15 -
16 45 CAL 108 5.2 ,_ -
,_ 17
-----------------·------·-----------------------------------------------------------------------------------,_ 18 Poorly Graded Sandstone 'SP', gray and yellowish brown, fine grained, moist,
... 19 weakly cemented.
-20 ,___
... 21 22 SPT ,___ ... 22
-23
... 24
,_ 25 ,___
··-·sg·· -----·ffo-·------------------------------------------------------------------------------------
26 CAL 6.2 -,___
Silty Sandstone 'SM', reddish brown, fine to coarse grained, moist, moderately
... 27 cemented.
... 28
... 29
,_ 30
~ 6295 Ferris Square, Suite C LOG OF BORING PROJECT NO. 1916A12 San Diego, CA 92121 PAGE B-2a
. (858) 537-3999
BORING NO. 2 (Continued)
Logged by: SEV Date Drilled: 10/31/2017
Method of Drilling: 6-inch diameter solid-stem auger limited access Elevation: 155' msl
t w w L2 -.:-..J ..J :,!!
a: 0. 0. (.) ~
!:!:. w :E :E !:, w
:c 0. < < > a: DESCRIPTION LAB TESTS
I-tn tn tn I-:::> I-0. 3: w ~ iii tn w 0 ~ ..J z 5 0 ..J a: :::> w
III 0 III 0 :E
(Continued)
... 31 26 SPT OLD PARALIC DEPOSITS, Unit 2-4, Undivided (O0p2-4): Silty Sandstone 'SM',
... 32 reddish brown, fine to coarse grained, moist, weakly cemented .
-33
-34
-35 ---------1-------·------·------------------------------------------------------------------------------------
... 36 50 CAL 105 7.0 Poorly Graded Sandstone with Silt 'SP-SM', light brown, fine grained, moist,
weakly cemented.
,_ 37
... 38
... 39
-40 -Gravel.
-41 78-9" ~
,_ 42 SANTIAGO FORMATION (Tsa): Silty Sandstone 'SM', light brown, fine to coarse
grained , moist, weakly cemented .
... 43
.,.. 44 -
"" 45 60 SPT
... 46 Total Depth: 45½ feet
.,.. 47 Groundwater not encountered
Backfilled: 10/31/2017
... 48
.,.. 49
-50
-51
-52
-53
-54
... 55
... 56
-57
-58
-59
-60 .. 6295 Ferris Square, Suite C
PROJECT NO. 1916A12 SanDiego,CA92121 LOG OF BORING PAGE B-2b
AlU ,\ i I t-h.. (858) 537-3999
PERCOLATION NO. 1
Logged by: SEV Date Drilled: 11/13/2017
Method of Drilling: 3½-inch diameter hand auger Elevation: 155' msl
t w w U:-~ .=-.J .J 0 a: Q. Q. ~
!:!::. w :i: :i: e:. w
J: Q. <( <( > a: DESCRIPTION LAB TESTS I-(/) (/) (/) I-:J I-Q. ;= w ~ cii (/) w 0 > .J z 0 C .J ir :J w
ID C ID C :i:
,_ 1 FILL: Silty Sand (SM), reddish brown, fine to coarse, moist to wet, medium dense.
,_ 2
,_ 3
,_ 4
,_ 5
,_ 6
,_ 7
,_ 8
,_ 9
,_ 10
,_ 11
,_ 12
,_ 13
-14
,_ 15
-16
,_ 17
,-18
-19
,-20
,_ 21
,_ 22
,_ 23
,-24
,-25
-26
,_ 27
,_ 28
,_ 29
,_ 30
A 6295 Ferris Square, Suite C
PROJECT NO. 1916A12 SanDiego,CA92121 LOG OF BORING PAGE 8-3
..l\111114 • f tt.. (858) 537-3999 ,.,
PERCOLATION NO. 2
Logged by: SEV Date Drilled: 11/13/2017
Method of Drilling: 3½-inch diameter hand auger Elevation: 155' msl
I-w w r2 -;:::-LL ...J ...J -;!?_
a: 0.. 0.. 0 ~
!:!:. w ~ ~ !:. w
J: 0.. ct ct > a: DESCRIPTION LAB TESTS I-(/) (/) (/) I-::,
0.. 3: w ~ iii I-
w > (/)
0 ...J z 0 C ...J ii: ::, w
Ill C Ill C ~
-1 FILL: Silty Sand (SM), brown, fine to coarse, moist to wet, medium dense.
,-2
-3
-4
-5
,-6
,-7
,-8
,-9
-10
-11
1-12
1-13
1-14
-15
-16
-17
1-18
,_ 19
1-20
,-21
,-22
-23
-24
._ 25
,-26
,-27
,-28
-29
-30
~ 6295 Ferris Square, Suite C
PROJECT NO. 1916A12 SanDiego,CA92121 LOG OF BORING PAGE 8-4
(858) 537 .3999
APPENDIXC
LABO RA TORY TEST PROCEDURES
APPENDIXC
LABO RA TORY TESTING PROCEDURES
1. Classification
2.
Soils were classified visually, generally according to the Unified Soil Classification System.
Classification tests were also completed on representative samples in accordance with
ASTM D422 for Grain Size. The test resultant soil classifications are shown on the Boring
Logs in Appendix B.
In-Situ Moisture/Density
The in-place moisture content and dry unit weight of selected soil samples were determined
using relatively undisturbed samples from the Cal Tube Sampler. The dry unit weights and
moisture contents are shown on the Boring Logs in Appendix B.
3. Percent Passing No. 200 Sieve
Particle size determinations for the percentage of sample passing the No. 200 sieve were
performed in general accordance with the laboratory procedures outlined in ASTM test
Method Dl 140. The results are shown on the Boring Logs in Appendix B.
4. Maximum Density
Maximum density tests were performed on a representative bag sample of the near surface
soils in accordance with ASTM Dl557. Test results are presented on the table below.
Sample Description Maximum Dry Optimum Moisture
Location Density (pcf) Content(%)
B-1 at 1' to 5' Silty Sand (SM) -Reddish Brown 132 9.0
5. Direct Shear
Direct Shear Tests were performed on an in-place sample of site soils in accordance with
ASTM D3080. The test results are presented in Figure C-1.
Page C-1
6295 Fen-is Square. Suite C
San Diego. CA 92121
(858) 537-3999
Hilton Tapestry Resort Expansion -Geotechnical Investigation
Carlsbad, California
6. Expansion Index
MTGL Project No. 1916Al2
MTGL Log No. 17-1619
Expansion Index testing was completed in accordance with the standard test method ASTM
D4829. Test results are presented below.
Sample Description Expansion Index Expansion
Location (El) Index
B-2 at 2' to 4 ' Silty Sand (SM) -Brown 0 Very Low
7. Corrosion
Chemical testing was performed on a representative sample to determine the corrosion
potential of the onsite soils. Testing consisted of pH, chlorides (CTM 422), soluble sulfates
(CTM 417), and resistivity (CTM 643). Test results are as follows:
Sample pH Chlorides Sulfates Resistivity
Location (oom) (ppm) (ohm-cm
B-1 at 1' to 5' 7.3 99 276 1,700
8. Consolidation
Consolidation tests were performed on representative, relatively undisturbed samples of the
underlying soils to . determine compressibility characteristics in accordance with ASTM
D2435. Test results are presented on Figure C-2.
Page C-2
6295 FcrTis Square. Suilc C
San Diego, CA 92121
(858) 537-3999
H
;,1:?~::; -=~= :::. :r::
-47 -,---+ ....... ---... --.... + .... ........ o ~-·-•··+ ........ _ ....... t ....... . I ••
0 2000 4000 6000
Normal Stress. psf
---r-..._ -
-+ +-------...... --
T+.-
T t:: i
-• +-... "1' • . ~--'--... -..
.. .. .. --+---i
! t + i I I
+ + t .
-+ .... ---,
•I ..
• • + • f t
.,_ ---+-'t' t I
~--+ t' ' .... ....-.... ,.. ......
8000 10000
6000 .. . -.... t -+ ~ -~-.
-!-+ I Sample No. 1 2 -. . . -. .. T . . --· I . . ... r t . . -----t ' t + . --t Water Content,% 7.2 7.2
5000 ... --+-T . I t -. ... + t Dry Density, pcf 118.6 118.9
. --. .....,_ -. . +-.J._ -+ . . . . -t • . 1 t + ~ Saturation, % 48.3 49.1
--. t ------t --+ +
• l-••
I I •• • •• ·r
12000
3
7.-4
117.5
48.1
f----• --+--,+ --. ' 4000
·c Void Ratio 0.3948 0.3910 0.4076 .... V) . + --+ • . + -• + a. ' i-I I I ... ,-~ -+. -T vi ;. + l-~ I ----V) . !'"/'"' l + I I ' !!:? ·--
u5 3000 1~ -t . . . + ... • . ; ... .... . I • + • t" + --<1l (I) + I . . -; . + ' .c -. . +---. ~ I -+ + -(/J 2000 W; --+-----t ' .... •-+ . '. --. --t -+ . . •
+ ;::/ r"t.' + ---+ -. I
1000 I t . -I . . ..._ __ -.
+ -. + ' . t l . -. -• -~-+ T ---.....
t 1 • . -+ . ' I ?" .... _..__,
0
0 5 10 15 20
Strain,%
Sample Type:
Description: Silty Sand (SM) -Brown
Assumed Specific Gravity= 2.65
Remarks:
Figure C-l
3
2
1
Diameter, in. 2.42 2.42 2.42
Heiaht, in. 1.00 1.00 1.00
Water Content,% 14.5 14.1 14.4
Dry Density, pct 119.6 120.5 119.6
0 Saturation, % 100.0 100.0 100.0 (I) ~
< Void Ratio 0.3830 0.3729 0.3830
Diameter, in. 2.42 2.42
Heiaht, in. 0.99 0.99
Normal Stress, psf l000 2000
Fail. Stress, psf 1274 1684
Strain,% 4.6 6.1
Ult. Stress , psf 886 1415
Strain,% 14.6 14.7
Strain rate, in./min. 0.010 0.010
Client:
Project: HILTON TAPESTRY
Sample Number: B2 Depth: 4'
Proj. No.: 19l 6-Al2 Date Sampled:
DIRECT SHEAR TEST REPORT
MTGL, Inc.
San Dieao. CA
2.42
0.98
4000
33 12
5.6
2974
14.7
0.0 10
CONSOLIDATION TEST REPORT
-0.2 \
0.0
0.2
0.4
0.6
C §
cil
E o.a
2l Q)
0..
1.0
\
' \
'-.. I\
" -
~ :\ ' \
1, ' ~ i\
' ~ :\
V ~ ~i Water
A~d
"\
' \ 1.2 ....___
............... \ ............ ...._
1.4
1.6
1 8
100
DRY DENSITY MOISTURE
(pcf) CONTENT, (%)
INITIAL 119.7 9.8
FINAL 13.8
-... ...... i""'l ~
1000
Pressure. p, psf
~
SUMMARY OF TEST RESULTS
SATURATION VOID SPECIFIC OVERBURDEN Pc
(%) RATIO GRAVITY (psf) (psf)
67.6 0.182
2.65 2053
100.0 0.365
Depth: 6' Sample Number: 82
Material Description: Silty Sand (SM) -Brown
Remarks:
uses:
MTGL, Inc. Client:
Project: HILTON TAPESTRY
San Die o CA Project No.: 1916-Al2
\ -\
!SWELL PRESS Cc (psf)
0.03
AASHTO:
Figure C-2
•
..
•
•
-
•
-
•
•
-
APPENDIXD
PERCOLATION TEST
-..
•
---
-
Hilton Tapestry Resort Expansion -Geotechnical Investigation
Carlsbad, California
APPENDIXD
PERCOLATION TEST
MTGL Project No. 1916Al2
MTGLLogNo. 17-1619
Two percolation tests were conducted in general accordance with the guidelines presented in the
Design Manual for Onsite Wastewater Treatment Systems (March 22, 2010 Edition) of the County
of San Diego Department of Environmental Health Land and Water Quality Division. The
percolation holes were drilled with a 3¼-inch auger to a depth of five (5) feet below existing grade .
The Site Plan, shows the approximate location of the percolation tests. The holes were presoaked
overnight and the test was performed on November 14, 2017. The percolation test results are
presented on Figures D-1 and D-2. Water was added during the percolation tests to help maintain a
constant level of water within the infiltration zone. The infiltration rate was estimated using the
Porchet Method with the percolation test data. The results of the percolation study indicates an
infiltration rate of 0.956 in/hr for P-1 and 0.638 81/hr for P-2.
Page D-1
5 Fc1Tis Square, Suit..: C
San Diego, CA 92121
(858) 537-3999
PERCOLATION DATA SHEET -
Project Name: Hilton Tapestry Job No.: 1916A12 Tested By: SEV
Test Hole No: P-1 Date Excavated: 11/13/2017 Date Tested: 11/14/2017
... Depth of Test Hole: 60Inches Soil Classification: Silty Sand 0: 3.25 Inches
Check for Sandy Soil Criteria Tested By: Date: Presoak:
SANDY SOIL CRITERIA TEST
• .. Trial Time Initial Final Change in
No. Time Interval Water Level Water Level Water Level
(min.) (inches) (inches) (inches)
..
-ii
1
I I
0:00
I I I
0.00
I 2 0:00 0.00
..
Use Normal Sandy (Circle One) Soil Criteria .. .. .. Reading Time Total Initial Final Change in Percolation
Time Interval Elapsed Time Water Leve1<1> Water Level Water Level Rate Number (min.) (hrs:min) (inches) (inches) (inches) (min/inch)
1 7:04 0:30 0:30 10.25 28.75 18.50 1.62 7:34
2 7:34 0:30 1:00 5.00 23.50 18.50 1.62 8:04
3 8:04 0:30 1:30 1.50 20.00 18.50 1.62 8:34
4 8:34 0:30 2:00 5.25 20.75 15.50 1.94 9:04
5 9:04 0:30 2:30 4.50 20.50 16.00 1.88 9:34 -.. 6 9:34 0:30 3:00 4.00 19.00 15.00 2.00 10:04
-7 10:04 0:30 3:30 4.25 19.25 15.00 2.00 10:34
8 10:34 0:30 4:00 3.00 17.75 14.75 2.03 11 :04
Average (of last 2) = 2.02
111 Water added to test hole after reading.
Infiltration Rate (Porchet Method}: Ho= 56.38
IIH 60 r Hf= 41.50 II 11 (in/hr)= 0.956 II I,= Lit (r+2Havg) IIH = 14.88 (Last 2 readings)
Hava;:: 48.94
Project No. 1916A12
Log No. 17-1619
FIGURE D-1
--PERCOLATION DATA SHEET
Project Name: Hilton Tapestry Job No.: 1916A12 Tested By: SEV
Test Hole No: P-2 Date Excavated: 11/13/2017 Date Tested: 11/14/2017
.. Depth of Test Hole: 62Inches Soil Classification: Silty Sand !<I: 3.25 Inches
-Check for Sandy Soil Criteria Tested By: Date: Presoak:
SANDY SOIL CRITERIA TEST -
·•
Trial Time Initial Final Change in
No. Time Interval Water Level Water Level Water Level
(min.) (inches) (inches) (inches) -
I
1
I I
0:00
I I I
0.00
I 2 0:00 0.00
• Use Normal Sandy (Circle One) Soil Criteria -
•
-
Reading Time Total Initial Final Change in Percolation
Time Interval Elapsed Time Water Leve1<1> Water Level Water Level Rate
Number (min.) (hrs:min) (inches) (inches) (inches) (min/inch)
..
1 7:06
7:36 0:30 0:30 3.75 19.50 15.75 1.90
2 7:36
8:06 0:30 1:00 8.00 17.50 9.50 3.16
3 8:06
8:36 0:30 1:30 3.50 15.00 11.50 2.61
-4 8:36 0:30 2:00 3.00 14.25 11.25 2.67
9:06
5 9:06
9:36 0:30 2:30 6.50 15.25 8.75 3.43
6 9:36
10:06 0:30 3:00 3.25 13.50 10.25 2.93
-7 10:06 0:30 3:30 2.00 13.25 11.25 2.67
10:36
8 10:36
11 :06 0:30 4:00 2.25 13.00 10.75 2.79
Average (of last 2) = 2.73
('I Water added to test hole after reading.
Infiltration Rate (Porchet Method): Ho= 59.88
IIH 60 r Hf= 48.88 II I, (in/hr)= 0.638 II I,= Ill (r+2Ha,g) IIH = 11.00 (Last 2 readings)
Havn = 54.38
Project No. 1916A 12
Log No. 17-1619
FIGURE D-2
APPENDIXE
STANDARD GRADING SPECIFICATIONS
Hilton Tapestry Resort Expansion -Geotechnical Investigation
Carlsbad, California
APPENDIXE
MTGL Project No. 1916Al2
MTGL Log No. 17-1619
GENERAL EARTHWORK AND GRADING SPECIFICATIONS
GENERAL
These specifications present general procedures and requirements for grading and earthwork as
shown on the approved grading plans, including preparation of areas to be filled, placement of fill,
installation of subdrains, and excavations. The recommendations contained in the attached
geotechnical report are a part of the earthwork and grading specifications and shall supersede the
provisions contained herein in the case of conflict. Evaluations performed by the Consultant during
the course of grading may result in new recommendations, which could supersede these
specifications, or the recommendations of the geotechnical report.
EARTHWORK OBSERVATION AND TESTING
Prior to the start of grading, a qualified Geotechnical Consultant (Geotechnical Engineer) shall be
employed for the purpose of observing earthwork procedures and testing the fills for conformance
with the recommendations of the geotechnical report and these specifications. It will be necessary
that the Consultant provide adequate testing and observation so that he may determine that the work
was accomplished as specified. It shall be the responsibility of the Contractor to assist the
Consultant and keep them apprised of work schedules and changes so that he may schedule his
personnel accordingly.
It shall be the sole responsibility of the Contractor to provide adequate equipment and methods to
accomplish the work in accordance with applicable grading codes or agency ordinances, these
specifications and the approved grading plans.
Maximum dry density tests used to determine the degree of compaction will be performed in
accordance with the American Society for Testing and Materials Test Method (ASTM) Dl557.
PREPARATION OF AREAS TO BE FILLED
Clearing and Grubbing: All brush, vegetation and debris shall be removed or piled and otherwise
disposed of.
Page E-1
5 Ferris Squme. Suitt: C
San Diego. CA 9212 I
(R"i8) 537-3999
-..
•
•
•
Hilton Tapestry Resort Expansion -Geotechnical Investigation
Carlsbad, California
MTGL Project No. 1916Al2
MTGLLogNo.17-1619
Processing: The existing ground which is determined to be satisfactory for support of fill shall be
scarified to a minimum depth of 12 inches. Existing ground, which is not satisfactory, shall be
overexcavated as specified in ~he following section.
Overexcavation: Soft, dry, spongy, highly fractured or otherwise unsuitable ground, extending to
such a depth that surface processing cannot adequately improve the condition, shall be
overexcavated down to firm ground, approved by the Consultant.
Moisture conditioning: Overexcavated and processed soils shall be watered, dried-back, blended,
and mixed as required to have a relatively uniform moisture content near the optimum moisture
content as determined by ASTM D1557.
Recompaction: Overexcavated and processed soils, which have been mixed, and moisture
conditioned uniformly shall be recompacted to a minimum relative compaction of 90 percent of
ASTMD1557 .
Benching: Where soils are placed on ground with slopes steeper than 5: 1 (horizontal to vertical),
the ground shall be stepped or benched. Benches shall be excavated in firm material for a
minimum width of 4 feet.
FILL MATERIAL
General: Material to be placed as fill shall be free of organic matter and other deleterious
substances, and shall be approved by the Consultant.
Oversize: Oversized material defined as rock, or other irreducible material with a maximum
dimension greater than 12 inches, shall not be buried or placed in fill, unless the location, material,
and disposal methods are specifically approved by the Consultant. Oversize disposal operations
shall be such that nesting of oversized material does not occur, and such that the oversize material
is completely surrounded by compacted or densified fill. Oversize material shall not be placed
within 10 feet vertically of finish grade or within the range of future utilities or underground
construction, unless specifically approved by the Consultant.
Import: If importing of fill material is required for grading, the import material shall meet the
general requirements .
Page E-2
5 Fenis S4.uare. Suit1: C
San Diego, CA 92121
(858) 5.17-3999
-
Hilton Tapestry Resort Expansion -Geotechnical Investigation
Carlsbad. California
FILL PLACEMENT AND COMPACTION
MTGL Project No. 1916Al2
MTGLLogNo. 17-1619
Fill Lifts: Approved fill material shall be placed in areas prepared to receive fill in near-horizontal
layers not exceeding 6 inches in compacted thickness. The Consultant may approve thicker lifts if
testing indicates the grading procedures are such that adequate compaction is being achieved with
lifts of greater thickness. Each layer shall be spread evenly and shall be thoroughly mixed during
spreading to attain uniformity of material and moisture in each layer.
Fill Moisture: Fill layers at a moisture content less than optimum shall be watered and mixed, and
wet fill layers shall be aerated by scarification or shall be blended with drier material. Moisture
conditioning and mixing of fill layers shall continue until the fill material is at uniform moisture
content at or near optimum.
Compaction of Fill: After each layer has been evenly spread, moisture conditioned, and mixed, it
shall be uniformly compacted to not less that 90 percent of maximum dry density in accordance
with ASTM D1557. Compaction equipment shall be adequately sized and shall be either
specifically designed for soil compaction or of proven reliability. to efficiently achieve the specified
degree of compaction.
Fill Slopes: Compacting on slopes shall be accomplished, in addition to normal compacting
procedures, by backrolling of slopes with sheepsfoot rollers at frequent increments of 2 to 3 feet as
the fill is placed, or by other methods producing satisfactory results. At the completion of grading,
the relative compaction of the slope out to the slope face shall be at least 90 percent in accordance
with ASTM D1557.
Compaction Testing: Field tests to check the fill moisture and degree of compaction will be
performed by the consultant. The location and frequency of tests shall be at the consultant's
discretion. In general, these tests will be taking at an interval not exceeding 2 feet in vertical rise,
and/or 1,000 cubic yards of fill placed. In addition, on slope faces, at least one test shall be taken
for each 5,000 square feet of slope face and/or each 10 feet of vertical height of slope.
SUBDRAIN INSTALLATION
Subdrain systems, if required, shall be installed in approved ground to conform to the approximate
alignment and details shown on the plans or herein. The subdrain location or materials shall not be
changed or modified without the approval of the Consultant. The Consultant, however, may
recommend and, upon approval, direct changes in subdrain line, grade or materials. All subdrains
should be surveyed for line and grade after installation and sufficient time shall be allowed for the
surveys, prior to commencement of fill over the subdrain.
Page E-3
5 Ferris Square, Suite C
s,m Diego. CA 92121
(858) 537-3999
--
Hilton Tapestry Resort Expansion -Geotechnical Investigation
Carlsbad, California
EXCAVATION
MTGL Project No. 1916Al2
MTGL Log No. 17-1619
Excavations and cut slopes will be examined during grading. If directed by the Consultant, further
excavation or overexcavation and refilling of cut areas, and/or remedial grading of cut slopes shall
be performed. Where fill over cut slopes are to be graded, unless otherwise approved, the cut
portion of the slope shall be made and approved by the Consultant prior to placement of materials
for construction of the fill portion of the slope.
Page E-4
5 Fen-is Squan.:. Suite C
San Diego. CA 921~1
(858) 537-3999
Corporate:
Phone: 714.632.2999 -FAX: 714.632.2974
2992 E. La Palma Ave, Suite A, Anaheim, CA 92806
Dispatch: 800.491.2990
San Diego/Imperial County:
Phone: 858.537.3999 -FAX: 858.537.3990
6295 Ferris Square, Suite C, San Diego, CA 92121
Dispatch: 800.491 .2990
Inland Empire:
Phone: 951 .653.4999 -Fax: 951 .653.4666
14467 Meridian Pkwy., Bldg. 2-A, Riverside, CA 92518
Dispatch: 800.491.2990
Indio:
Phone: 760.342.4677 -Fax: 760.342.4525
44917 Golf Center Parkway, Suite 1, Indio, CA 92201
Dispatch: 800.491.2990
PROJECT LISTINGS:
Highways; Streets; Airfield Paving; Parking
Lots; Garages; Vehicle Maintenance; Park-
ing Decks; Commercial Buildings; Shop-
ping Centers; Educational Facilities;
Classrooms; Office Buildings;
Industrial Parks; Hospitals &
Medical Facilities; Utilities;
Gas, Water, Electric;
Auditoriums &
Theaters; Postal
Facilities;
Housing