HomeMy WebLinkAboutCT 03-02; CARLSBAD RANCH PLANNING AREA 5; ACOUSTICAL ANALYSIS REPORT; 2002-12-02ACOUSTECH CONSULTANTS
REPORT No. 1102-CBS
Acoustical Analysis Report for
Carlsbad Ranch Planning Area 5
Legoland Resort & Hotel
Tentative Map
December 2, 2002
Prepared For:
Mr. Tim Stripe
Grand Pacific Resorts
5900 Pasteur Court,
Suite 200
Carlsbad, CA 92008
For Submittal To:
City of Carlsbad
Planning Department
2075 Las Palmas Drive
Carlsbad, California 92009-1576
Prepared By:
Gary W. Hicks
Acoustech Consultants
Certified Acoustical Consultant -San Diego County
~d~
Report No. 1102-CB5
SUMMARY OF FINDINGS
1.0 Introduction
1.1 Purpose
1.2 Requirements
2.0 Site Location & Plan
3.0 Site Noise Conditions
TABLE OF CONTENTS
3.1 Existing Site Noise Conditions
3.2 Future Site Noise Conditions
4.0 Determination of Future Noise Levels at Exterior Walls
5.0 Interior Noise Mitigation Feasibility
6.0 Miscellaneous Noise Sources
7.0 Exterior Use Areas
References
Appendix A-Traffic Noise Models
December 2, 2002
1
1
1
1
1
1
1
5
6
6
7
7
7
ACOUSTECH CONSULTANTS 11736 Treadwell Drive, Poway, California 92064 Telephone (619) 271-6675
Report No. 1102-CBS December 2, 2002
SUMMARY OF FINDINGS
• As portions of the project site lies within the 60-70 dB CNEL Noise Contours of
McClellan-Palomar Airport, an acoustical study is required to show that interior
noise levels may be feasibly mitigated, if necessary, to :S 45 dB CNEL.
• The principal noise source impacting the southern portion of the site is the
McClellan-Palomar Airport operations, with some minimal noise contribution from
Palomar Airport Road.
• The principal noise source impacting the northern portion of the site is traffic noise
due to Cannon Road.
• Current exterior noise levels due to McClellan Palomar Airport aircraft noise are
determined from the 1995 Airport Noise Contours to be up to 64 dBA CNEL in a
small southern portion of the project site, as illustrated in Figure 2-2 of the report.
All other portions of the site will have noise levels due to aircraft below 60 dB
CNEL. Year 2020 noise levels were adjusted for a 50% increase in airport
operations, yielding worst-case aircraft noise exposure to the site of 66 dB CNEL.
• In addition to aircraft noise, Palomar Airport Road traffic noise is expected to
increase future noise levels of southern-most rooms by approximately 0.4 dB, with
a total noise exposure to worst-case rooms of 66. 4 dB CNEL from both sources.
• Cannon Road traffic noise is expected to increase future noise levels of northern-
most rooms by approximately 7.2 dB, with a total noise exposure to worst-case
rooms of 66.7 dB CNEL.
• No special buildi~g construction is required with the exception that single-glazed
windows may need to be closed to achieve the desired interior noise levels.
• If windows must be closed, mechanical ventilation or air-conditioning will be
required to provide fresh air circulation per UBC standards.
• Dual-glazed windows are not expected to be required.
• A thorough acoustical analysis must be performed to determine specific mitigation
requirements when constructions drawings are ready for submittal to ensure
compliance with CAC Title 24 interior noise requirements.
• No significant noise sources have been identified within the project, nor are there
any nose sensitive receptors located nearby.
• There are no known noise impacts from or to the adjacent properties.
ACOUSTECH CONSULTANTS 11736 Treadwell Drive, Poway, California 92064 Telephone (619) 271-6675
Report No. 1102-CB5
1.0 Introduction
1.1 Purpose
1 December 2, 2002
Carlsbad Ranch Planning Area 5 is a proposed destination resort with approximately
350 hotel rooms, 350 timeshare units, 2 restaurants, recreational areas and meeting
rooms. Planning is currently at the tentative map stage and hotels rooms and unit
rooms have not yet been delineated. The purpose of this acoustical study is to
provide an evaluation of the exterior noise environment due to aircraft and local
roadways and the feasibility of potential mitigation to assure interior noise levels due
to do not exceed 45 dB CNEL.
1.2 Requirements
A small portion of the proposed project lies within the 60 dB CNEL contour of the
McClellan-Palomar Airport. The Noise/Land Use Implementation Directives of the
airport state that all transient lodging buildings within CNEL 60-70 contours must
be subjected to an acoustical study to determine that interior noise levels will not
exceed 45 dB CNEL. Evaluation of the noise environment and the basic building
shell is conducted to validate the ability of the project to meet standards.
This study will not satisfy California Noise Insulation Standards (CAC, Title 24)
requirements that interior noise levels in all hotel rooms and multi-family residences
do not exceed 45 dB CNEL, as they require analysis of as-yet unavailable
construction documents.
2.0 Site Location & Plan
The proposed complex will consist of approximately 350 hotel rooms, 350 timeshare
units, 2 restaurants, recreational areas and meeting rooms. The southern property
line borders ~egoland Park. Directly to the west is planned golf course. Cannon
Road forms the relatively small northern border of the project site. The eastern
border is directly adjacent to open space and Hidden Valley Road. Figure 2-1 shows
vicinity map and Figure 2-2 illustrates the site plan.
3.0 Site Noise Conditions
3.1 Existing Site Noise Conditions
Aircraft Noise
We have been provided the 1995 Noise Contours for McClellan-Palomar Airport.
See Figure 3-1. Using these contours and a scaling technique, we have established
the location of the airport contours upon the project site plan (Figure 2-2). It can be
seen from the figure that buildings to the south of the 60 dB CNEL noise contour
will be subjected to aircraft noise levels ranging from 60 dB CNEL to 64 dB CNEL.
North of the 60 dB CNEL contour line, buildings will be exposed to aircraft noise
levels of< 60 dB CNEL.
ACOUSTECH CONSULTANTS 11736 Treadwell Drive, Poway, California 92064 Telephone (619) 271-6675
Report No. 1102-CBS
.P-' CU f C O c..r:.v,
1
2
3
4
5
2
GEMOLOGICAL IN RESEARCH & DEVE~~ITUTE OF AMERICA
COMMUNITY HOTEL PMENT / OFFICE
LEGOLAND AND RETAIL
RESORT
6
7
8a
86
9
December 2, 2002
SPECIALTY RETAIL
FLOWER FIELDS
GOLF COURSE
GOLF COURSE
NATURAL OPEN SPACE
SOURCE: Carlsbad Ranch .. Specd,c Plan, 1995
t
1200· north
ACOUSTECH , , , Figure 2-1 Vicin1'ty Ma
CONSULl'ANTS p 11736 Trca<lwcll D . nvc, Poway c 1·c ' a 11ornia 92064 Telephone (858) 271-6675
~5dBCNEL
:1 Noise Contours
)> n 0
C ~ tn n :r:
n
C
2 c.r.:
C r: -► 2 -c/2
Ci :;. < !>
N -.J ......
I 0\ 0\ -.J VI
lfil17 ~ RUNWAY
PROTECTION ZONE
FLIGHT ACTIVITY ZONE
SOURCE: Son Diego As5ociolion of Governments
t
(T 3000· norih
.. ·· • ..
z 0 -,< < // ''. ; / ::;
····· .... ····r···• ...... ·······.... ·.;,,·;,:·:·:··:~-.:.'..:~.,/ ,.•··· ~->·
/::::>·.-..... ,::·•.·: .. , ...... . .. ·····
; ·.::/···./ ...... , .. ·······.
~·:::::::.:;:-_(:~:::.-_-----,,\ ~
L----\--y---~.~~~· \ ---_____ _,,,)f.: .... ·:.<\,··-··_..... l/\
\./'; ............ ••'\ I ---···•·... I \ .,,..-, I
·.. I I .,' : I
·····... \ I .,,..-..-I __,.---..·· ' ,_ ... ,.......... ,.·····... \
I----. • V•\ ... ·.! \\ ··-...... ; ..... .
-""':, r, ---~·~ ~:·~·~~·=·1:~~·:·~·t~·:·~:·~·:::-,::.~.T~~-.,,_,-·-f'/
:I . j
l \ \, .f ,,·.·.·.' ; I I : i I. .
·· i I\ \ / j
i I\ II ,i -I+ .. =·'
•--.:.. ...
i·········; ,f ,1 \ ! ,...... . I • •.•••••
\ ........ '',{,,,.cc~:::ci.:.:•.:~.:::.::;,_,:~-\,-:: .. ~~--:~_;=:.·.~.· .. ~.·.;L/~.: ... ·,; L.. /)
-.. ,··········•"····"··"· .. ..~-····-··-·· i_
••••oouoooo,0000, i
i -~~·········1 .. -·•· t~ / \ ... _ ... i ;!·' ; ·• ............. { , ••. ) ·····-·······-···········-·· l-·--·-· .. ;::.~...... ! ~ \
ti (1)
(")
(1) a O' ~
N
N 0 0 N
Figure 3-1 McClellan-Palomar Airport 1995 Noise Contours
Report No. 1102-CBS 5 December 2, 2002
Traffic Noise Due to Palomar Airport Road
Traffic noise due to Palomar Airport Road may potentially impact the project in the
southern portion of the site. Per SANDAG's Average Weekday Traffic Volumes
Report, 51,100 ADT was reported for Palomar Airport Road for the year 2000.
Utilizing our traffic model (Ref. 1), the current traffic noise is estimated to be 77.4
dB CNEL at 50 feet from centerline. The unmitigated current traffic noise level at
the nearest project building facade ( ~ 1600 feet from centerline) is estimated to be
54.8 dB CNEL. See Appendix A for details.
Traffic Noise Due to Cannon Road
Traffic noise due to Cannon Road may potentially impact the project in the northern
portion of the site. Current year 2000 traffic volumes for Cannon Road is reported
by SANDAG to be 3200. Our traffic model projects a traffic noise level of 65.7 dB
CNEL at 50 feet from centerline. The unmitigated traffic noise level at the nearest
project building facade ( ~ 130 feet from centerline) is estimated to be~ 59.5 dB
CNEL.
3.2 Future Site Noise Conditions
Aircraft Noise
The future noise levels are unknown. A 50% increase in airport volume by year the
2020 would result in a 2 dB increase in worst-case noise levels to 66 dB CNEL. The
typical small and commuter aircraft spectrum for 66 dB CNEL is shown below.
Aircraft Noise Spectrum:
125 250 500
72 70 62
1000
58
Traffic Noise Due to Palomar Airport Road
2000
56
4000
54
dBA
66
Utilizing SANDAG's online Transportation Forecast Information Center (TFIC), we
find that year 2020 traffic volumes for Palomar Airport Road are forecast to be
63,000 ADT in the area of the project. Our traffic model predicts year 2020 traffic
noise from this roadway will be 78.3 dB CNEL at 50 feet from centerline, or a 0.9
dB increase from current levels.
Traffic Noise Due to Cannon Road
Again utilizing SAND AG' s TFIC, we find that year 2020 traffic volumes for
Cannon Road are forecast to be 17,000 ADT in the area of the project. Our traffic
model predicts year 2020 traffic noise from Cannon Road will be 72.9 dB CNEL at
50 feet from centerline, or a 7 .2 dB increase from current levels.
ACOUSTECH CONSULTANTS 11736 Treadwell Drive, Poway, California 92064 Telephone (619) 271-6675
Report No. 1102-CBS 6
4. 0 Determination of Future Noise Levels at Exterior Walls
Worst-Case Rooms -Southern End of Project
December 2, 2002
Rooms in the southern portion of the project site will potentially be subjected to
noise levels potentially as high as 66 dB CNEL due to aircraft noise. Future traffic
noise from Palomar Airport Road is predicted to be 78.3 dB CNEL at 50 feet from
centerline. The nearest residential buildings from Palomar Airport Road are
approximately 1600 feet from the roadway centerline. The unmitigated noise level at
this distance is predicted to be 55.7 dB CNEL at nearest, worst-case facades. Noise
levels from both aircraft and vehicular traffic noise at the facades could potentially
be as high as 66.4 dB CNEL.
Worst-Case Rooms -Northern End of Proiect
'
The noise environment at the northern portion of the project site will be dominated
by traffic noise due to Cannon Road. At the worst-case residential building facades,
approximately 130 feet from centerline, future noise levels are estimated to be 66. 7
dB CNEL.
5.0 Interior Noise Mitigation Requirements
The City and State require that interior noise levels not exceed a CNEL of 45 dB in
all transient lodging buildings and multi-family dwellings. At this stage in the
planning, it is only necessary to ensure that mitigation is feasible to reduce interior
noise to 45 dB CNEL or less.
Worst-Case Rooms -Southern End of Project
The estimated future facade noise levels in the southern portion of the site are 66 to
66.4 dB CNEL. Typical building construction will provide approximately 10-15 dB
noise reduction with windows open and 25-30 dB with closed windows. In order to
achieve interior noise levels of 45 dB or less, no special building construction is
required with the exception that single-glazed windows may need to be closed to
achieve the desired interior noise levels. In that case, mechanical ventilation or air-
conditioning will be required to provide fresh air circulation per UBC standards.
Worst-Case Rooms -Northern End of Project
Future traffic noise levels from Cannon Road are predicted to be as high as 66. 7 dB
CNEL at facades facing the roadway. As above, no special building construction is
required with the exception that single-glazed windows may need to be closed to
achieve the desired interior noise levels. In that case, mechanical ventilation or air-
conditioning will be required to provide fresh air circulation per UBC standards.
A thorough acoustical analysis must be performed to determine specific mitigation
requirements.
ACOUSTECH CONS ULT ANTS 11736 Treadwell Drive, Poway, California 92064 Telephone (619) 271-6675
Report No. 1102-CB5 7 December 2, 2002
6.0 Miscellaneous Noise Sources
There are no known significant noise sources within the project that will affect
exterior sites. Should noise sources be found, mitigation may be required to meet
property line noise limits. Other than traffic and aircraft noise, there are no other
known sources at adjoining properties.
7.0 Exterior Use Areas
Exterior use areas located south of the 60 dB CNEL noise contour for the
McClellan-Palomar Airport shall be subjected to noise levels as high as 66.4 dB
CNEL. For the Carlsbad Ranch Specific Plan, exposure of up to 70 dB CNEL is
considered normally acceptable for all non-retail exterior site uses.
REFERENCES
1. "Calculation of Day-Night Levels Resulting From Highway Traffic"; Simpson,
Miles; U.S. Environmental Protection Agency, August 1982.
ACOUSTECH CONSULTANTS 11736 Treadwell Drive, Poway, California 92064 Telephone (619) 271-6675
Report No. 1102-CBS
Appendix A
Traffic Noise Models
December 2, 2002
ACOUSTECH CONSULTANTS 11736 Treadwell Drive, Poway, California 92064 Telephone (858) 271-6675
Acoustech Consultants
Job -Roadway
Location
Condition
Mix Condition
Yeh. Type
Speed
Mix%
No. of veh.
SEL
Gradient Adj.
Stop Sign Adj.
Comp. Leq @ 50 ft
Comp. Ldn-CNEL
Leq@ 50'
Ldn-CNEL @ 50'
77.4
(@ 50 ft)
Le~oland Resort
Palomar Airport:
Current
Estimated
Autos
50
0.950
48545
72.3
0.0
0.0
73.5
72.9
78.0
77.4
70
7.4
0.493
3.11
156
Legoland Resort
Traffic Noise Model
ADT
Night%
Rd Gradient
Rd surface
(A-MT-HT)
Speed
V=x%ADT
Med. T. H.T.
50 50
0.020 0.030
1022 1533
82.3 89.3
0.0 0.0
0.0 0.0
66.8 75.5
66.2 74.9
65 I 60
12.4 17.4
0.827 1.160
6.71 14.45
335 I 723
Palomar Airport Road
Current -Estimated Traffic Mix
1102-CB5
51100
0.12
0%
N
95-2-3
50
0.100
I 55 jdB CNEL
22.4
1.493
31.14
I 1557 1ft from CL
Acoustech Consultants
Job
Roadway
Location
Condition
Mix Condition
Yeh. Type
Speed
Mix%
No. of veh.
SEL -Gradient Adj.
Stop Sign Adj.
Comp. Leq @ 50 ft
Comp. Ldn-CNEL
Leq@ 50'
Ldn-CNEL @ 50'
78.3
(@ 50 ft)
Legoland Resort
Palomar Airport
2020
Estimated
Autos
50
0.950
59850
72.3
0.0
0.0
74.5
73.8
78.9
78.3
70
8.3
0.553
3.58
179
Legoland Resort
Traffic Noise Model
ADT
Night%
Rd Gradient
Rd surface
(A-MT-HT)
Speed
V=x%ADT
Med. T. H.T.
50 50
0.020 0.030
1260 1890
--
82.3 89.3 --
0.0 0.0
0.0 0.0
67.7 76.5
67.1 75.8
65 I 60
13.3 18.3
0.887 1.220
7.70 16.60
385 I 830
Palomar Airport Road
2020 -Estimated Traffic Mix
1102-CB5
63000
0.12
0%
N
95-2-3
50
0.100
·-. . ---
---. . -
--
I 55 !dB CNEL
23.3
1.553
35.75
I 1788 jftfrom CL
Acoustech Consultants
Job
Roadway
Location
--
Condition
Mix Condition
Veh. Type
Speed
Mix%
No. ofveh.
SEL
Gradient Adj.
S_top Sig~ Adj.
Comp. Leq @ 50 ft
Comp. Ldn-CNEL
Leq@ 50'
Ldn-CNEL @ 50'
65.7
(@ 50 ft)
Legoland Resort
Traffic Noise Model
Legoland Resort ADT
Cannon
Current
Estimated
Autos
40
0.920
2944
70.3
0.0
0.0
59.4
58.8
66.3
65.7
70
-4.3
-0.287
0.52
26
Night%
Rd Gradient
Rd surface
(A-MT-HT)
Speed
V=x%ADT
Med. T. H.T.
40 40
0.040 0.040
128 128
80.3 89.3
0.0 0.0
0.0 0.0
55.8 64.8
55.2 64.2
65 I 60
0.7 5.7
0.047 0.380
1.11 2.40
56 I 120
Cannon Road
Current -Estimated Traffic Mix
1102-CB5
3200
0.12
0%
N
92-4-4
40
0.100
I 55 !dB CNEL
10.7
0.713
5.17
I 258 !ft from CL
Acoustech Consultants
Job
Roadway
Location
Condition
Mix Condition
Veh. Type
Speed
Mix%
No. ofveh.
SEL
Gradient Adj.
Stop Sign Adj.
Comp. Leq @ 50 ft
Comp. Ldn-CNEL
Leq@ 50'
Ldn-CNEL @ 50'
72.9
(@ 50 ft)
Legoland Resort
Cannon
2020
Estimated
Autos
40
0.920
15640
70.3
0.0
0.0
66.7
66.1
73.5
72.9
70
2.9
0.193
1.56
78
Legoland Resort
Traffic Noise Model
ADT
Night%
Rd Gradient
Rd surface
(A-MT-HT)
Speed
V=x% ADT
Med. T. H.T.
40 40
0.040 0.040
680 680
80.3 89.3
0.0 0.0
0.0 0.0
63.1 72.0
62.4 71.4
65 I 60
7.9 12.9
0.527 0.860
3.36 7.24
168 I 362
Cannon Road
2020 -Estimated Traffic Mix
1102-CB5
17000
0.12
0%
N
92-4-4
40
0.100
I 55 jdB CNEL
17.9
1.193
15.61
I 780 !ft from CL