HomeMy WebLinkAboutCT 15-09; Quarry Creek PA R-4 East; QUARRY CREEK R-4 CIRCULATION IMPACT REPORT; 2015-07-15URBAN SYSTEMS ASSOCIATES, INC. PLANNING & TRAFFIC ENGINEERING, MARKETING & PROJECT SUPPORT ATTN: FROM: CONSULTANTS TO INDUSTRY AND GOVERNMENT Aaron Parker, P.E. SB&O Justin P. Schlaefli, PE TE PTOE MEMO E-Mail: T aaronp@sboinc.com TOTAL PAGES (Including 2+attachments Cover): DATE: July 15, 2015 TIME: 2:24:40 PM JOB NUMBER: 002715 SUBJECT: Quarry Creek R-4 Circulation Impact Report Confidential Communications This transmittal is intended for the recipient named above. Unless otherwise expressly indicated, this entire communication is confidential and privileged information. lfyou are not the intended recipient, do not disclose, copy, distribute or use this information. If you received this transmission in error, please notify us immediately by telephone, at our expense and destroy the information. As requested, we have completed our review of the site plan provided for the Quarry Creek Planning Area 3 (R- 3). Compared to the approved traffic study for the Quarry Creek project, the residential unit count has increased by 20 units as discussed and approved in several previous memos and conformance reviews with the City of Carlsbad. Thi s minor increase from 188 units to 205 units has previously been reviewed and approved and will not be discussed here. However, there is also a minor reconfiguration of access. Previous plans showed "Public Street D" connecting all the way through R-4 to a cul-de-sac at the terminus of "Public Street A" as shown in Attachment A. The cu rrent configuration would have "Public Street D" terminating at a cul-de-sac at "Private Driveway A" within R-4. This would serve as the terminus of "Public Street D" with traffic wishing to travel to "Public Street A" having to traverse private drives. The current proposal is shown in Attachment B. We have evaluated the effect of this redistribution of traffic and have determined that the planned configuration will function adequately without significant effects on Street A. This analysis is discussed below. Trip Generation The anticipated trip generation from R-4 is shown in the Table 1. Redistribution of Traffic As discussed above, the minor alteration in access and connection of "Public Street D" will cause a redistribution of traffic due to the removal of a direct connection to "Public Street A". However, this will primarily effect traffic from R-5 which already planned primary access fro m "Public Street A". Therefore, the redistribution is anticipated to be minor with a small increase in traffic resulting at the intersection of "Street B" and "Street A". Thi s redi stribution is expected to result in the volumes shown in Attachment C with peak hour volumes at the intersections at "Public Street B" being very similar to previous studies. Conclusion: Based on the volumes in this analysis, it is not anticipated that the reconfigured access will have any impacts or cause any changes to the planned roadway network for the Quarry Creek Master Plan area. Quarry] Creek R4 Memo 8451 Miralani Drive, Suite A • San Diego, CA 92123 • (858) 560-4911 Aaron Parker, P.E. SB&O, Inc. PLANNING AREA R-4 (East) R-4 {West) Subtotal R-4 (East) R-4 (West) Subtotal Difference AMOUNT TRIP RATE* 125 DU 8/ DU 63 DU 10/ DU 149 DU 8/ DU 56 DU 10/ DU TABLE 1 Project Trip Generation Original Project AM PEAK HOUR ADT %* # 1/0 IN 1,000 8 80 2 :8 8 630 8 so 3:7 15 1,630 130 23 Proposed Project 1,192 8 95 2:8 19 560 8 so 3:7 15 1,752 145 34 122 15 11 •Source: SANDAG Brief Gulde Vehicular Traffic Generation Rates For the San Diego Region, April 2002 . .. Note: Trip rate adjusted to account for possible 30 child day-care facility (Strips/ child x 30 = 1S0 ADT). I / O =Inbound/ Outbound ratio. Quan Y2, © Urban Systems Associates, Inc. July 14, 2015 PM PEAK HOUR OUT %* # 1/0 IN OUT 72 10 100 7:3 70 30 35 10 63 7:3 44 19 107 163 114 49 76 10 119 7:3 83 36 35 10 56 7:3 39 17 111 175 123 53 4 12 9 4 Creek R4 Memo 845 I Miralani Dr., Suite A • San Diego, CA 92 l 26 • (858) 560-4911 Aaron Parker, P.E. SB&O, Inc. Quarry, Cr111lk Mast11r Plan Quarry, Cr111lk lnv11Stors, LLC 001307 Attachment A FIGURE 11-2 Vehicular Circulation Plan 11-3 Quarry3 © Urban Systems Associates, inc. July 14, 2015 C> Urban Syst11ms A..ssoctatGS, Inc. Octob11r 5, 1012 001307-Report_H.doc Creek R4 Memo 8451 Mira/ani Dr., Suite A • San Diego, CA 92126 • (858) 560-4911 Aaron Parker, P.E. SB&O, Inc. ,.,.,. © Urban Systems Associates, Inc. Attachment B ,.,..,,,. ... -w~ ,:,-.~-11,,0: .. ...,,:_v,_..,..,,.,,)o)t,01 Quar,y4 '··...__ ....... \ \ \ IIWl'JMI,_. OI/AHliY CIICCK PIANHINC Allt:A 11-• CAST AH() wcsr 8451 Miralani Dr., Suite A• San Diego, CA 92126 • (858) 560-4911 July 14, 2015 ~ ---- Creek R4 Memo . . Aaron Parker, P.E. SB&O, Inc. Attachment C Quarry5 8451 Mira/ani Dr., Suite A • San Diego, CA 92126 • (858) 560-4911 © Urban Systems Associates, Inc. July 14, 2015 ---- Creek R4 Memo