Loading...
HomeMy WebLinkAboutCT 15-09; Quarry Creek PA R-4 East; UPDATE REPORT QUARRY CREEK R-4; 2015-07-10UPDATE REPORT QUARRY CREEK R-4 CARLSBAD, CALIFORNIA PREPARED FOR CORNERSTONE COMMUNITIES SAN DIEGO, CALIFORNIA JULY 10, 2015 PROJECT NO. 07135-42-05 GEOCON INCORPORATED -\ GEOTECHNICAL a Project No. 07135-42-05 July 10, 2015 Cornerstone Communities 4365 Executive Drive, Suite 600 San Diego, California 92121 Attention: Mr. Jack Robson ENVIRONMENTAL. MATERIALSO Subject: UPDATE REPORT QUARRY CREEKR-4 CARLSBAD, CALIFORNIA References: I. Update Geotechnical Investigation, Quarry Creek, Carlsbad/Oceanside, California, prepared by Geocon Incorporated, dated February 24, 2015 (Project No. 07135- 42-05). 2. Site Plan for Quarry Creek, Planning Area R-4 East and West, prepared by SB&O, Inc., plot date June 28, 2015. Dear Mr. Robson: In accordance with the request of SB&O, we have reviewed the above-referenced site plan which includes proposed building pad locations and pad elevations for the R-4 area at the subject site. The purpose of our review was to evaluate if the recommendations in Reference I remain applicable for the proposed grading and building locations shown in Reference 2. Area R-4 is located at the southwest comer of the Quarry Creek property. Review of Reference 2 indicates that fine grading will consist of cuts and fills of approximately 6 feet or less from proposed sheet grade elevations to construct 56 single-family detached lots, 29 duplex lots, and 29 triplex lots. Based on pad grades shown on Reference 2, at the completion of mass grading, the site will be underlain by both native terrace deposits and compacted fill. Figure I shows the pre-grading site geology using Reference 2 as the base map. At the completion of mass grading, an updated geologic map should be prepared based on actual graded conditions. Based on our review of Reference 2, it is the opinion of Geocon Incorporated that the recommendations contained in Reference I remain applicable to the proposed project. However, an 6960 Flanders Drive • San Diego, California 92121-2974 • Telephone 858.558.6900 • Fox 858.558.6159 update geotechnical report should be prepared for the site once mass grading is completed. The update report will provide recommendations for fine grading, including undercutting of cut to fill transition lots, based on actual as-graded conditions. If you have any questions regarding this letter, or if we may be of further service, please contact the undersigned at your convenience. Very truly yours, GEOCONINCORPORATED le~-~ Ro e C. Mikesell GE 33 RCM:dmc (I) (e-mail) Addressee SB&O, Inc. Attention: Mr. Aaron Parker Project No. 07135-42-05 -2 -July t0, 2015 GRAPHIC SCAI.C .. ,· .... " ....... "' .. ·~ ...... · .. ';;";..' =..,;;'""~· .... -, .. · ~ Qud(_J.MlCICU,,llMTl.011.1.CO---~ Ocf •. ,.~,-/;.rt:Cl"UC----J Oaf M..1.UWNie----.-1 Oc--"""""" Qlsf ~~ Qt_,_,f(~DO'(llfl'"~-~ Ts ~f()IIW.llONII)-.-~ Jspi -&lil.TOIHTNltM'~-~ ,-...,_, .. · .-Ltt:A-0/f-l'lUII.Oo:ltCOOlffAC• -=--·w .......... ,0.....-~ GEOLOGIC MAP OUAUr:Y CREEK R-4 CAA1S8AD, CAIJFOlcNIA __, ,•.,oa .... 01-10.,0,~ --1nm-,2-G$