HomeMy WebLinkAboutCT 16-02; OCEAN; PRELIMINARY DRAINAGE REPORT FOR OCEAN CONDOMINIUMS; 2016-08-23• • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • PRELIMINARY DRAINAGE REPORT FOR OCEAN CONDOMINIUMS August23,2016 Prepared for: MJNF Holding, LLC 1907 Apple St, Suite 8 Oceanside, CA 92054 Prepared by: David Wiener, P.E. 5050 Avenida Encinas, Suite 260 Carlsbad , CA 92008 (760) 603-6252 dwiener@mbakerintl.com Michael Baker INTERNATIONAL RECEIVED SE? OS 20\6 ARLS6A0 C\IY Or\Ni oN\S\ON PLANN ( 4 ( I • (, C C , C: ( ; C; ( ; ( ~ C ( : (,,, ,,, ("'• !Iii., c.: C C C C C C C C 0 • • • • • • • • • Table of Contents 1 Introduction and Purpose ....................................................................................... 1 1.1 Background and Project Description .............................................................. 1 1.2 Pre-Development Drainage Patterns .............................................................. 1 1.3 Post Development Drainage Patterns ............................................................. 1 2 Rational Hydrology ................................................................................................. 2 3 4 Detention Calculations ............................................................................................ 2 Conclusions ............................................................................................................ 3 Technical Appendices Appendix A: Existing Hydrology Map Appendix B: Proposed Hydrology Map Appendix C: Detention Calculations Ocean Condominiums Preliminary Drainage Report Michael Baker INTERNATIONAL { :: I ,, \ " c:~ C) I',, \1,lf' C C (, ... ,;ii C C C C C C C C C C C C C C C C C C C C C C C C ,... 1 Introduction and Purpose 1.1 Background and Project Description The site is located at 2501 State Street in Carlsbad, California. APN 155-200-04. The parcel area is 0.49 acres. In the existing condition, the project site is occupied by an office building (Soil Retention Systems Inc.) with asphalt parking lot. The site is surrounded by NCTD right-of-way to the west, State Street to the east, senior living to the north, and recently constructed condominiums to the south. In the proposed condition, the existing building and parking will be demolished and removed. In its place, 17 condominium units will be constructed on a podium deck. The podium will enclose the proposed parking structure. The finish floor of the parking structure will be approximately 3 feet below existing grade. A new driveway entrance off of State Street will be constructed for the parking structure. 1.2 Pre-Development Drainage Patterns The runoff from the site flows to the east to State Street via surface flow, roof downspouts and a sidewalk underdrain. Area drains capture the flow on site and convey it to sidewalk underdrain. Once in the curb and gutter of State Street, flow travels to the north, where it enters existing storm drain piping. The piping outfalls to Buena Vista Lagoon via 66" pipe. A small portion of the site (approximately 0.4 acres, or 8% of the parcel area) flows to the adjacent properties to the north and west. Refer to the Existing Hydrology Map in Appendix A. 1.3 Post-Development Drainage Patterns Drainage patterns will not change as a result of the project. However there will no longer be flows to adjacent properties. The entire site will be captured in private onsite drainage piping and discharge to State Street via sidewalk underdrains. The majority of the site will consist of the building structure (approximately 0.42 acres). Rainfall that hits the exposed surface (roof and hardscape) of the building will be directed to raised planters. The planters will connect to drain piping through the building and onto State Street. Approximately 0.07 acres of the site beyond the building structure will consist of permeable paver walkways, landscape area, and concrete hardscape. These areas will sheet flow or area drain to State Street. Refer to the Proposed Hydraulics Exhibit in Appendix B. Ocean Condominiums Preliminary Drainage Report 1 Michael Baker INTERNATIONAL I " (''" I"" G C C C C C C C C C C C C C C C C C C C C C C C C C • Q C C C - 2 Rational Hydrology The Rational Method hydrology study was completed using methodology described in the San Diego County Hydrology Manual. The design storm for this study is the 100-year events. Using the San Diego County Hydrology Manual lsopluvial Map, the 100-year PG was found to be 2.5 inches. Based on the geotechnical report for the project, the soil type was assumed to be type 'D'. A runoff coefficient ("C") value of 0.35 was used for pervious area and 0.90 for impervious areas. In the existing condition, C was assumed to be 0.85 per the Manual for office/commercial site. The time of concentration (Tc) to each node was assumed to be 5 minutes. The intensity was found using Figure 3-2 (San Diego County Hydrology Manual). The drainage areas and node designations used can be seen on the Hydrology Maps in Appendices A and B. The flow (Q) at each node was calculated using the Rational Equation Q=CIA, where: • Q = Flow (cubic feet per second) • C = runoff coefficient • I = Intensity (inches per hour) • A= Drainage Area (acres) 3 Detention Calculations Rational method calculations determined that peak flowrate in the proposed condition is 2.68 cfs. Therefore detention measures must be used to attenuate the flow to the pre- development level of 2.52 cfs. Flow reduction of at least 0.16 cfs is required. Using results from rational method calculations for peak flow in the proposed condition, 6-hour hydrographs were generated using the County approved software prepared by Rick Engineering Company, which utilizes the methods described in Section 6 of the San Diego County Hydrology Manual. Hydraflow Hydrographs software was used to route the post-development hydrographs through proposed biofiltration planters, which will provide both flood control and water quality treatment. The biofiltration planters were modeled using stage, storage, discharge data produced by San Diego Hydrology Model (SOHM). The detention and peak flow mitigation calculations can be found in Appendix C. The biofiltration planter details can be found on the DMA Plan, and in the Storm Water Quality Management Plan (SWQMP) for the project. Ocean Condominiums Preliminary Drainage Report 2 Michael Baker INTERNATIONAL ( ,., ,, 0 C C C C C C C C C C C C C C C C C C C C C C C C) C 0 0 C 4 Conclusions Drainage patterns will not change significantly as a result of the proposed improvements. In both the existing and proposed condition the site drains to State Street via sidewalk underdrain pipe. The project will decrease peak 100-year discharges from the project site. Peak flow is mitigated by routing through the proposed biofiltration raised planters on the podium deck. The peak flows in the existing versus proposed condition on shown below. Refer to the attached Appendices for maps and calculations. Proposed piping from the site will consist of sidewalk underdrains. From Manning's Equation, Omax in a 4" underdrain pipe at 2% slope is 0.36 cfs. Based on the peak flow of 0.91 cfs in the proposed condition, there will need to be three 4" sidewalk underdrain connections from the site, outfalling to the gutter on State Street. Existino Condition A (acres) I C I Q100 (cfs) 0.45 I 0.85 I 2.52 Proposed Condition Area A (acres) A B Total Ocean Condominiums Preliminary Drainage Report 0.42 0.07 0.49 C 0100 (cfs) 0.85 2.49 0.39 0.19 2.68 3 Mitigated Q100 (cfs} 0.72 0.19 0.91 Michael Baker INTERNATIONAL • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • Appendix A: Existing Hydrology Map I 20 10 0 20 40 50 ~I ~1 .:J1----r i----;1 SCALE: 1 "=20 ' HYDROLOGY CALCULATIONS DRAINAGE AREA= 19,500 SF= 0.45 ACRES C = 0.85 (TABLE 3-1: OFFICE) Tc= 5 MINUTES (ASSUMED MIN.) PB (100) = 2.5 INCHES I100 = 7.44 P6 (TcA-.645) = 6.6 INCHES/HOUR 0100 =CIA= 0.85 * 6.6 * 0.45 = 2.52 CFS I ! I I / I EX. LEGEND EX . CONTOUR -( I J )-- EXISTING STORM DRAIN ---Su---- PROJECT DRAINAGE BOUNDARY----- DIRECTION OF FLOW SITE DISCHARGE POINT - Ocean CONDOMINIUMS EXISTING HYDROLOGY MAP Michael Baker INTERNATIONAL 5050 Avenida Encinas Suite 260 Carlsbad, CA 92008 Phone: (760) 476-9193 MBAKERINTL.COM • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • Appendix B: Proposed Hydrology Map .,,. .,,. PROP. POINT. •.. s iTE DISCHARGE···· 0100 = 0.91 cfs 3 CURB OUTLE_TS / / PLANVIEW -ABOVE PODIUM DECK Existing Condition A (acres) C 0.45 0 .. 85 I t !'. • ,j . 'i ' .,,. Q100 (cfs) '} 5') .~11/H; .... LEGEND RAISED PLANTER ON PODIUM DECK (BIOFILTRATION BMP) IMPERVIOUS ROOF f;:'·,·· .',1 IMPERVIOUS EXPOSED HARDSCAPE I : • : I DRAINAGE AREA ~ HYDROLOGY CALCULATIONS -AREA A DRAINAGE AREA= 18,290 SF= 0.42 ACRES C = 0.90 (PODIUM) Tc= 5 MINUTES (ASSUMED MIN.) Ps (100) = 2.5 INCHES !100 = 7.44 Ps (TcA-.645) = 6.6 INCHES/HOUR Q100 = CIA = 0.90 * 6.6 * 0.345 = 2.49 CFS UNMITIGATED 0100 = 0 . 72 CFS MIT I GA TED ( THROUGH PLANTERS) 20 10 0 20 40 60 1-~f---1 ___ 1----i1 SCALE: 1 "=20' .~··· PROP . SI TE DI SCHARGE·· · - POINT. 0100 = 0.91 cfs 3 CURB OUTLETS ' , .. r-: ,,l l / / RAISED PODIUM -----·· / GROUND LEVEL -OUTSIDE OF PODIUM Proposed Condition Area A (acres) C 0100 (cfs) Mitigated 0100 (cfs) A 0.42 0.85 2.49 0.72 B 0.07 0.39 0.19 0.19 Total 0.49 2.68 0.91 :l l LEGEND PERMEABLE PA VER WALKWAY fbsj:Lc't:j~ LANDSCAPE AREA DRAINAGE AREA HYDROLOGY CALCULATIONS -AREA B DRAINAGE AREA= 3,245 SF= 0.074 ACRES IMPERVIOUS AREA= 225 SF= 7% C = 0.9(7%) + 0.35(93%) = 0.39 Tc= 5 MINUTES (ASSUMED MIN.) Ps (100) = 2.5 INCHES !100 = 7.44 Ps (TcA-.645) = 6.6 INCHES/HOUR 0100 =CIA= 0.39 * 6.6 * 0.074 = 0. 19 CFS Ocean CONDOMINIUMS PROPOSED HYDROLOGY MAP Michael Baker INTERNATIONAL 5050 Avenida Encinas Suite 260 Carlsbad, CA 92008 Phone: (760) 476-9193 MBAKERINTL.COM E ~ 0 • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • -·-..... ' ~ _-~, '-.::----~· ------ Appendix C: Proposed Detention Calculations RATIONAL METHOD HYDROGRAPH PROGRAM COPYRIGHT 1992, 2001 RICK ENGINEERING COMPANY RUN DATE 8/25/2016 HYDROGRAPH FILE NAME Text1 TIME OF CONCENTRATION 5 MIN. 1 ' 6 HOUR RAINFALL 2.5 INCHES BASIN AREA 0.42 ACRES ( ' RUNOFF COEFFICIENT 0.9 (:';, ',~ PEAK DISCHARGE 2.49 CFS (i"i',;) TIME (MIN)= 0 TIME (MIN) = 5 (I:'' TIME (MIN)= 10 "'" TIME (MIN)= 15 (". TIME (MIN) = 20 W TIME (MIN)= 25 a TIME (MIN)= 30 V TIME (MIN) = 35 • TIME (MIN) = 40 TIME (MIN) = 45 • TIME (MIN) = 50 TIME (MIN)= 55 • TIME (MIN)= 60 TIME (MIN) = 65 • TIME (MIN) = 70 TIME (MIN) = 75 • TIME (MIN) = 80 TIME (MIN) = 85 TIME (MIN) = 90 • TIME (MIN) = 95 • TIME (MIN)= 100 TIME (MIN)= 105 • TIME (MIN)= 110 TIME (MIN)= 115 ll/flll\ TIME (MIN)= 120 w TIME (MIN)= 125 .,., TIME (MIN)= 130 w TIME (MIN)= 135 TIME (MIN) = 140 C TIME (MIN)= 145 ..., TIME (MIN)= 150 w TIME (MIN)= 155 TIME (MIN)= 160 C TIME (MIN)= 165 TIME (MIN) = 170 C TIME (MIN) = 175 TIME (MIN)= 180 C TIME (MIN)= 185 TIME (MIN)= 190 C TIME (MIN)= 195 TIME (MIN) = 200 C TIME (MIN)= 205 TIME (MIN)= 210 C TIME (MIN)= 215 TIME (MIN)= 220 C TIME (MIN) = 225 TIME (MIN) = 230 • TIME (MIN) = 235 TIME (MIN) = 240 • TIME (MIN)= 245 TIME (MIN) = 250 • TIME (MIN) = 255 TIME (MIN) = 260 • TIME (MIN)= 265 TIME (MIN)= 270 • TIME (MIN)= 275 TIME (MIN) = 280 • TIME (MIN) = 285 TIME (MIN) = 290 • TIME (MIN) = 295 TIME (MIN) = 300 • TIME (MIN) = 305 TIME (MIN)= 310 • TIME (MIN)= 315 TIME (MIN) = 320 • TIME (MIN) = 325 TIME (MIN)= 330 • TIME (MIN) = 335 TIME (MIN) = 340 TIME (MIN) = 345 C TIME (MIN) = 350 C TIME (MIN) = 355 ,.. DISCHARGE (CFS)= 0 DISCHARGE (CFS)= 0.1 DISCHARGE (CFS) = 0.1 DISCHARGE (CFS) = 0.1 DISCHARGE (CFS) = 0.1 DISCHARGE (CFS)= 0.1 DISCHARGE (CFS)= 0.1 DISCHARGE (CFS) = 0.1 DISCHARGE (CFS) = 0.1 DISCHARGE (CFS) = 0.1 DISCHARGE (CFS) = 0.1 DISCHARGE (CFS)= 0.1 DISCHARGE (CFS)= 0.1 DISCHARGE (CFS)= 0.1 DISCHARGE (CFS)= 0.1 DISCHARGE (CFS) = 0.1 DISCHARGE (CFS) = 0.1 DISCHARGE (CFS)= 0.1 DISCHARGE (CFS) = 0.1 DISCHARGE (CFS)= 0.1 DISCHARGE (CFS) = 0.1 DISCHARGE (CFS) = 0.1 DISCHARGE (CFS) = 0.1 DISCHARGE (CFS) = 0.1 DISCHARGE (CFS)= 0.1 DISCHARGE (CFS) = 0.1 DISCHARGE (CFS)= 0.1 DISCHARGE (CFS)= 0.1 DISCHARGE (CFS) = 0.1 DISCHARGE (CFS) = 0.1 DISCHARGE (CFS)= 0.1 DISCHARGE (CFS)= 0.1 DISCHARGE (CFS) = 0.1 DISCHARGE (CFS)= 0.1 DISCHARGE (CFS)= 0.1 DISCHARGE (CFS)= 0.1 DISCHARGE (CFS)= 0.1 DISCHARGE (CFS)= 0.1 DISCHARGE (CFS) = 0.1 DISCHARGE (CFS) = 0.2 DISCHARGE (CFS) = 0.2 DISCHARGE (CFS) = 0.2 DISCHARGE (CFS) = 0.2 DISCHARGE (CFS)= 0.2 DISCHARGE (CFS) = 0.2 DISCHARGE (CFS) = 0.3 DISCHARGE (CFS) = 0.3 DISCHARGE (CFS) = 0.5 DISCHARGE (CFS)= 0.7 DISCHARGE (CFS) = 2.49 DISCHARGE (CFS)= 0.4 DISCHARGE (CFS) = 0.3 DISCHARGE (CFS)= 0.2 DISCHARGE (CFS) = 0.2 DISCHARGE (CFS) = 0.2 DISCHARGE (CFS) = 0.1 DISCHARGE (CFS)= 0.1 DISCHARGE (CFS)= 0.1 DISCHARGE (CFS)= 0.1 DISCHARGE (CFS)= 0.1 DISCHARGE (CFS) = 0.1 DISCHARGE (CFS) = 0.1 DISCHARGE (CFS) = 0.1 DISCHARGE (CFS) = 0.1 DISCHARGE (CFS)= 0.1 DISCHARGE (CFS) = 0.1 DISCHARGE (CFS) = 0.1 DISCHARGE (CFS)= 0.1 DISCHARGE (CFS)= 0.1 DISCHARGE (CFS)= 0.1 DISCHARGE (CFS)= 0.1 DISCHARGE (CFS)= 0.1 ft' c::, • • • Q C C C C C C C C C C C • • • • • • • • • C C C ,... TIME (MIN) = 360 TIME (MIN) = 365 DISCHARGE (CFS)= 0.1 DISCHARGE (CFS)= 0 G:) ~,1,, 'Iii# 4~;) Cit) ft) 0 • • • C C 0 C 0 C C C C C C C 0 • • • • • • • • • • • SDHM 3.0 PROJECT REPORT Biofiltration Planter -Stage/Storage/Discharge Project Name: OCEAN CONDOMINIUMS Site Address: 2501 STATE ST City : CARLSBAD Report Date: 8/25/2016 Name : BIOFILTRATION PLANTER Surface Area: 1,285 square feet Material thickness of first layer: 2 Material type for first layer: Sandy loam Material thickness of second layer: 1 Material type for second layer: GRAVEL Material thickness of third layer: O Material type for third layer: GRAVEL Underdrain used Underdrain Diameter: 4 inches Discharge Structure Riser Height: 0.33 ft. Riser Diameter: 12 in. Hydraulic Table Stas:e ( feet) Area(ac.) Volume(ac-ft.) 0.0000 0.0295 0.0000 0.5000 0.0295 0.0059 1.0000 0.0295 0. 0119 1.5000 0.0295 0.0178 2.0000 0.0295 0.0237 2.5000 0.0295 0.0299 3.0000 0.0295 0.0360 3.5000 0.0295 0.0507 Dischars:e(cfs) 0.0000 0.0019 0.0104 0.0301 0.0604 0.0700 0.0700 0.7235 CJ C) () () Ct> () 0 0 C> C) 0 C C C C C C C C C C C> • • • • C • 0 C C C C - 1 Hyd rog ra Ph s Um ma ry Re po rtydraflow Hydrographs Extension for AutoCAD® Civil 30® 2009 by Autodesk, Inc. v6.066 Hyd. Hydrograph Peak Time Time to Hyd. Inflow Maximum Total Hydrograph No. type flow interval peak volume hyd(s) elevation strge used description (origin) (cfs) (min) (min) (cuft) (ft) (cuft) 1 Manual 2.490 5 245 3,717 ----------------Area A 3 Reservoir 0.723 5 250 3,582 1 13.50 2,207 Mitigated Flow ocean planters.gpw Return Period: 100 Year Thursday, Aug 25, 2016 • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 30® 2009 by Autodesk, Inc. v6.066 Hyd. No. 1 Area A Hydrograph type Storm frequency Time interval a (cfs) 3.00 2.00 1.00 0.00 ,_ ,_ , 0.0 = Manual = 100 yrs = 5 min ,._ 1.0 -HydNo.1 2.0 Peak discharge Time to peak Hyd. volume Area A Unmitigated Hyd. No. 1 --100 Year ~ -~- - --,_ I 3.0 4.0 5.0 •~ \ 6.0 2 Thursday, Aug 25, 2016 = 2.490 cfs = 4.08 hrs = 3,717 cuft a (cfs) 3.00 2.00 1.00 0.00 7.0 Time {hrs) • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 30® 2009 by Autodesk, Inc. v6.066 Hyd. No. 3 Mitigated Flow Hydrograph type Storm frequency Time interval Inflow hyd. No. Reservoir name = Reservoir = 100 yrs = 5 min = 1 -Area A = Planters Storage Indication method used . Mitigated Flow 3 Thursday, Aug 25, 2016 I Peak discharge = 0.723 cfs Time to peak = 4.17 hrs Hyd. volume = 3,582 cuft Max. Elevation = 13.50 ft Max. Storage = 2,207 cuft Q (cfs) Hyd. No. 3 --100 Year Q (cfs) 3.00 --,-----r----.------,.-----.------,.-----.------,.-----.--------..-3.00 0.00 ~~~~~l::::=~===d::==-.L..--L--L __ J_ o.oo 0.0 2.0 4.0 6.0 8.0 10.0 12.0 14.0 16.0 18.0 -HydNo.3 -HydNo.1 11111111111 Total storage used = 2,207 cuft Time (hrs) • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • Pond Report Hydraftow Hydrographs Extension for AutoCAD® Civil 30® 2009 by Autodesk, Inc. v6.066 Pond No. 1 -Planters Pond Data Pond storage is based on user-defined values . Stage I Storage Table Stage (ft) Elevation (ft) Contour area (sqft) Iner. Storage (cuft) 0.00 10.00 n/a 0 0.50 10.50 n/a 257 1.00 11.00 n/a 257 1.50 11.50 n/a 257 2.00 12.00 n/a 257 2.50 12.50 n/a 274 3.00 13.00 n/a 266 3.50 13.50 n/a 640 Total storage (cuft) 0 257 514 771 1,028 1,302 1,568 2,208 Culvert / Orifice Structures Weir Structures [AJ [BJ [CJ [PrfRsrJ [AJ [BJ Rise (in) = 0.00 0.00 0.00 0.00 Crest Len (ft) = 0.00 0.00 Span (in) = 0.00 0.00 0.00 0.00 Crest El. (ft) = 0.00 0.00 No. Barrels = 0 0 0 0 Weir Coeff. = 3.33 3.33 Invert El. (ft) = 0.00 0.00 0.00 0.00 Weir Type -- Length (ft) = 0.00 0.00 0.00 0.00 Multi-Stage = No No Slope(%) = 0.00 0.00 0.00 n/a N-Value = .013 .013 .013 nla Orifice Coeff. = 0.60 0.60 0.60 0.60 Exfil.(in/hr) = 0.000 (by Wet area) Multi-Stage = n/a No No No TW Elev. (ft) = 0.00 4 Thursday, Aug 25, 2016 [CJ [DJ 0.00 0.00 0.00 0.00 3.33 3.33 No No Note: CulverVOrifice outflows are analyzed under inlet (ic) and outlet (oc) control. Weir risers checked for orifice conditions (ic) and submergence (s) . Stage (ft) 4.00 3.00 ,_ ' 2.00 1.00 I I 0.00 0.00 0.08 -Total Q - 1- - 0.16 0.24 Stage I Discharge - --~ I•- - 0.32 0.40 0.48 - , __ 0.56 0.64 0.72 Elev (ft) 14.00 13.00 12.00 11.00 10.00 0.80 Discharge (cfs)