Loading...
HomeMy WebLinkAboutCT 2019-0002; MADISON FIVE; PRELIMINARY DRAINAGE REPORT AND STORM WATER STANDARD PROJECT REQUIREMENTS; 2019-01-17PRELIMINARY DRAINAGE REPORT AND STORM WATER STANDARD PROJECT REQUIREMENTS For MADISON STREET & OAK ST. Southeast Corner of Madison St. & Oak St. Carlsbad, CA APN 204-031-01 & 204-031-02 January 17, 2019 Mel Landy, PE PREPARED BY: Jose Sanchez, PE 2888 LOKER AVENUE EAST, SUITE 217 CARLSBAD, CA 92010 (760) 929-2288 Hwl. HOWES I WEILER I LANDY PLANNING & ENGINEERING Page | 1 of 77 DRAINAGE REPORT Madison Street & Oak Avenue TABLE OF CONTENTS Project Vicinity Map Introduction …………………………………………………………………….2 Existing Drainage Conditions…...…………………………………………….4 Proposed Drainage Conditions…...…………………………………………..4 Methodology ……...…………………………………………………………….4-7 Drainage Summary .……………………………………………………………8 Storm Water Quality Summary…………………………………………………8 Conclusions ………………………………………………………………………9 References ……………………………………………………………………….9 Appendix 1 Existing Conditions Calculations - Basin Map 2 Developed Conditions Calculations – Basin Map 3 Storm Water Standard Project Requirements 4 Maps and Charts, Weighted Runoff Coefficient Calc. www.HWL-PE.COM 2888 Loker Avenue East, Suite 217, Carlsbad, CA 92010 I Tel. 760.929.2288 I Email. info@HWL-PE.COM Page | 2 of 77 DRAINAGE REPORT Madison Street & Oak Avenue Introduction This Drainage Study for the proposed five-unit attached residential condominium building development for APN 204-031-01 and 204-034-02 has been prepared to analyze the hydrologic and hydraulic characteristics of the existing and proposed project site. This report intends to present both the methodology and the calculations used for determining the runoff from the project site in both the pre-developed (existing) conditions and the post-developed (proposed) conditions produced by the 100-year, 6-hour storm. In addition, this report will propose the sizing of all necessary storm drain facilities and storm drain piping to safely convey the runoff, based on the 100-year rainfall event, per County of San Diego Hydrology and Storm Drain Design Standards. Elevations range for the project site are approximately 54.0 feet above mean sea level (mls) in the south east corner of the site along the alley way to approximately 50.9 feet at the north west at the intersection of Madison street and Oak Avenue. The project is within two separate legal lots, known as APN 201-031-01 and 204-031-02, Lot 15 and 16. The site is located on the southeast corner of Madison street and Oak Avenue, in the city of Carlsbad, consisting of approximately 0.18 Acres. Said lots are bordered on the North by Oak Avenue, on the east by an alley, on the west by Madison Street and on the south by a single family residential property. See Vicinity Map Below. Project site is currently undeveloped and consists of a small shed at the northwest corner with fencing round the perimeter of the property. The vegetation within the site consist of mature trees and palm trees on the eastern portion of the project. www.HWL-PE.COM 2888 Loker Avenue East, Suite 217, Carlsbad, CA 92010 I Tel. 760.929.2288 I Email. info@HWL-PE.COM Page | 3 of 77 DRAINAGE REPORT Madison Street & Oak Avenue PROJECT VICINITY MAP www.HWL-PE.COM 2888 Loker Avenue East, Suite 217, Carlsbad, CA 92010 I Tel. 760.929.2288 I Email. info@HWL-PE.COM Page | 4 of 77 DRAINAGE REPORT Madison Street & Oak Avenue Existing Drainage Conditions Project site has a flat terrain with the high point of the site located on the south east corner adjacent to the alley with terrain sloping on a north westerly direction towards the intersection of Oak Ave. and Madison street. The project site does not have any under ground drainage system to convey flows off site, flows leave the site along the westerly property line where they comingle with flows from Madison Street and Oak Avenue before continuing a south westerly direction along Oak Avenue, until they enter an underground conveyance system located approximately 550 feet from the project site. Eventually flows discharge into Buena Vista Lagoon. Proposed Drainage Conditions The project proposes to create a five-unit multi-family residential site, with new impervious surfaces which consist of: attached garages, rooftops, walkways, and patio area. The site will include landscape areas within the frontage of Madison Street and Oak Avenue. There will be grading activities to level out areas for new improvements, but the drainage patterns will remain the same. The project proposes installation of raised planters for water quality purposes and storm drain systems that will convey flows to the same pre-development discharge points. Study Methodology The method of analysis was based on the Rational Method according to the San Diego. Runoff calculations for this study were accomplished by using the Rational Method. The Rational Method is a physically-based numerical method where runoff is assumed to be directly proportional to rainfall and area, less losses for infiltration and depression storage. Flows were computed based on the Rational formula: Q = CIA Where Q = Peak discharge (cfs); C = runoff coefficient, based on land use and soil type I = rainfall intensity (in/hr) A = watershed area (acre) (1) Runoff Coefficient, C Table 4-1 lists the estimated coefficients for urban areas. www.HWL-PE.COM 2888 Loker Avenue East, Suite 217, Carlsbad, CA 92010 I Tel. 760.929.2288 I Email. info@HWL-PE.COM Page | 5 of 77 DRAINAGE REPORT Madison Street & Oak Avenue Table 4-1 The runoff coefficient C for this site is calculated as follows pursuant to section 3.1.2 of the County Hydrology Manual. The runoff coefficient (C) represents the ratio of rainfall that runs off the watershed versus the portion that infiltrates to the soil. The runoff coefficient is dependent on the land use coverage and soil type (Table 4-1). Adjustment have been made to accurately represent the existing compacted rough graded condition. See appendix 3, for runoff coefficient calculations, which were prepared based on soil type and impervious percentage using the formula by the San Diego County Hydrology Manual C = 0.90 × (% Impervious) + Cp × (1 - % Impervious) Where: Cp = Pervious Coefficient Runoff Value for the soil type (shown in Table 3-1 as Undisturbed Natural Terrain/Permanent Open Space, 0% Impervious). Soil type can be determined from the soil type map provided in Appendix 4 of the San Diego County Hydrology Manual. (2) Rainfall Intensity, I Average rainfall intensity for a duration equal to the Tc for the area, in inches per hour. The storm frequency for this study has a 100-year recurrence interval. The six-hour anticipated precipitation for the project site subject to the design storm frequency. R -OFF ,ooEFFICIL"lT (%) Hnhologiir Soi:l!Type Ll\J"ID SE (County Eletm"nts) lmpE'I'!i". A B ,c D Permanent Open Spare 020 0. s 0.30 0.35 Resiooitiial, 1.0 DU/A or fess: 10 027 0.32 o,.J6 0.41 Residential, 2 .0 D /A or fess 20 0 4 0.3:S 0.412 0.46 Residential, .9 D /A or fess 25 038 0.41 0.45 0.49 Residential, 4.3 DU/A or fess 30 0.41 0.45 0.48: 0.5_ Residential, .3 D /A or less 40 0.48 0.51 0.54 0.57 Residential, 10.9 DU/ . ..tl. or Jess, 5 0.52 0.54 0,.5 0.60 Residential, 14.5 D -/A or less, so 055 0.00 0.6,3 Residential, 24.0 D 7Aor Jess, 65 0.66 0.69 0. l Resiooitiial, 3 .0 DU/A or Jess, 80 o: 6, o,.1s 0. 9 ei.ghl:!oJhiod CoD:llllelcial 80 0. 6, 0. 0. s: 0. 9 Ge:neraill Commerciaill 8.S 0.,80 0.81 0.82 Offi.ce Pro:fes&ionaYCo:mmerc ·.a1 90 o,. 0.85 limited Im.1e.1rial 90 0.84 0.85 Ge:neraill lmM:riaill 95 o,_g7 0.87 www.HWL-PE.COM 2888 Loker Avenue East, Suite 217, Carlsbad, CA 92010 I Tel. 760.929.2288 I Email. info@HWL·PE.COM Page | 6 of 77 DRAINAGE REPORT Madison Street & Oak Avenue P6 = 2.55 in P24 = 4.5 in P6 is in the range of 45% to 65% of P24 and therefore doesn’t need to be adjusted. The RM equation assumes that the storm event being analyzed delivers precipitation to the entire basin uniformly, and therefore the peak discharge rate will occur when a raindrop falls at the most remote portion of the basin arrives at the point of analysis. The RM also assumes that the fraction of rainfall that becomes runoff or the runoff coefficient C is not affected by the storm intensity, I, or the precipitation zone number. (1) Time of Concentration, Tc The time of concentration is the time required for runoff to flow from the most remote part of the watershed to the outlet point under consideration. The time of concentration for each sub-area on site, Tc is determined from the following formula (San Diego County Hydrology Manual, dated June 2003) with the initial lengths and times adjusted per Table 3-2 of the Manual for slope and land use. There is an illustration of this formula in Figure 2, which is per County 2003 Hydrology Manual. Time of concentration (TC) is composed of two components: The initial time of T, = l .B(l. ~C)✓D (For overland time of flow) 'S Where, T, = Time of Concentration (hours) D = Watercourse Distance (ft) S= Slope(%) C = Runoff Coefficient ( l 1.9 Ll )O.lSS T = --' M (For natural watersheds)! Where, T~ = Time of Concentration in hours (hou rs) L = Watercourse Distance (miles) M = Change in elevation along effective slope line (ft) The average rainfall intensity is ca lculated from the following equation (San Diego County Hydrology Manual, June 2003) Where, I = Rainfa ll Intensity (in/hr) P6 = Six hour precipitation (inches) D = Duration (min.) www.HWL-PE.COM 2888 Loker Avenue East, Suite 217, Carlsbad, CA 92010 I Tel. 760.929.2288 I Email. info@HWL-PE.COM Page | 7 of 77 DRAINAGE REPORT Madison Street & Oak Avenue concentration (Ti ), and the travel time (Tt ). The maximum overland flow length (LM ) is used from Table 4 in calculating the initial time of concentration. The source for this chart is the San Diego County Hydrology Manual (Table 3.2), June 2003. In addition to the above Ration Method assumptions, the conservative assumption that all runoff coefficients utilized for this report are based on Type “B” The County of San Diego Rational Method program within CivilDesign was utilized in calculating runoff for all basins smaller than 0.5 square miles in size. Table 4 • Maximum Overland Flow Length (LM) & Initial Time of Concentration (T;) Element DU/ 0.50% 1% 2% 3% 5% 10% Acre LM Ti LM Ti LM Ti LM Ti LM Ti LM Ti Natural 50 13.2 70 12.5 85 10.9 100 10.3 100 8.7 100 6.9 LDR 1 50 12.2 70 115 85 10.0 100 9.5 100 8.0 100 6.4 LDR 2 50 113 70 10.5 85 9.2 100 8.8 100 7.4 100 5.8 LDR 2.9 50 103.0 70 10.0 85 8.8 95 8.1 100 7.0 100 5.6 J:,,IDR 4.3 50 10.2 70 9.6 80 8.1 95 7.8 100 6.7 100 5.3 J:,,IDR 7.3 50 9.2 65 8.4 80 7.4 95 7.0 100 6.0 100 4.8 J:,,IDR 10.9 50 8.7 65 7.9 80 6.9 90 6.4 100 5.7 100 4.5 J:,,IDR 14.5 50 8.2 65 7.4 80 6.5 90 6.0 100 5.4 100 4.3 HDR 24 50 6.7 65 6.1 75 5.1 90 4.9 95 4.3 100 3.5 HDR 43 50 5.3 65 4.7 75 4.0 85 3.8 95 3.4 100 2.7 N. Com. 50 5.3 60 4.5 75 4.0 85 3.8 95 3.4 100 2.7 G. Com. 50 4.7 60 4.1 75 3.6 85 3.4 90 2.9 100 2.4 OP/Com 50 410 60 3.7 70 3.1 80 2.9 90 2.6 100 2.2 Limited ! 50 4.2 60 3.7 70 3.1 80 2.9 90 2.6 100 2.2 General I 50 3.7 60 3.2 70 2.7 80 2.6 90 2.3 100 19 www.HWL•PE.COM 2888 Loker Avenue East, Suite 217, Ca·lsbad, CA 92010 I Tel. 760.929.2288 I Email. info:WHWL•PE.COM Page | 8 of 77 DRAINAGE REPORT Madison Street & Oak Avenue Drainage Summary Upon performing hydrologic analysis of the project site in both the proposed developed and existing condition, the following results were produced: Table 1 - Summary of existing conditions BASIN / Node Effective C Tc (min.) I in/hr Area (ac) Total Qpeak (cfs) Total A / 15 0.27 11.6 3.91 0.18 0.19 Total -- -- -- 0.18 0.19 Table 2 – Summary of developed conditions BASIN / Node Effective C Tc (min.) I in/hr Area (ac) Total Qpeak (cfs) Total A /17 0.78 4.05 6.72 0.11 0.58 B/30 0.71 5.73 6.15 0.07 0.31 TOTAL -- -- -- 0.18 0.84 As shown on tables above, there will be an increase in a 100-year storm event in the proposed condition of 0.65 CFS. Storm water Quality Summary This project has been determined to be a “Standard Project” per the City of Carlsbad Storm Water Standards Questionnaire (E-34) and is therefore exempt from priority project requirements. The development proposes to reduce the discharge of pollutants offsite by utilizing source control and Site Design Low Impact Development (LID) BMP’s to the maximum extent possible. The project proposed landscaping and ground cover along the frontage of Madison Street and Oak Avenue. Roof downspouts will convey flows to eight (8) total planters within the project site. Five (5) raised planters are fronting Oak Avenue, two (2) raised planters fronting Madison Street, and one (1) ground planter is located at the south east corner of unit 3, which will be constructed with impermeable liner around the perimeter and along portion of unit 3 foundation (acting as a cutoff wall) to avoid lateral migration of infiltration under the building. Said planters will discharge flows via curb outlets at the predevelopment discharge point. As shown in Table 1 and Table 2, the project has increase peak flows in the unmitigated 100-year storm condition, therefor the proposed planters will be utilized to mitigate the increase runoff. The raised planters will be integrated with the landscape design to provide treatment to storm water runoff generated on-site before discharging runoff in a control manner. I I www.HWL-PE.COM 2888 Loker Avenue East, Suite 217, Carlsbad, CA 92010 I Tel. 760.929.2288 I Email. info@HWL-PE.COM Page | 9 of 77 DRAINAGE REPORT Madison Street & Oak Avenue Conclusions The proposed storm drain system was designed in accordance with the guidelines set by the County of San Diego. During the design of the proposed drainage systems precautions were taken to limit adverse downstream affects and to maintain existing drainage characteristics wherever possible. A summary of the facts and findings associated with this project and the measures addressed by this report is as follows: • The project will not significantly alter drainage patterns on the site. • The ultimate discharge points will not be changed. • Graded areas and slopes will be landscaped to reduce or eliminate sediment discharge. • The storm drain system for the project is designed to route and convey all resulting runoff from developed conditions to the existing points of discharge. References "San Diego County Hydrology Manual", revised June 2003, County of San Diego, Department of Public Works, Flood Control Section. "California Regional Water Quality Control Board Order No. 2001-07," California Regional Water Control Board, San Diego Region (SDRWQCB). “City of Carlsbad BMP Design Manual” February 2016, Edition www.HWL-PE.COM 2888 Loker Avenue East, Suite 217, Carlsbad, CA 92010 I Tel. 760.929.2288 I Email. info@HWL-PE.COM Page | 10 of 77 DRAINAGE REPORT Madison Street & Oak Avenue APPENDIX 1 Existing Conditions Calculations & Drainage Map www.HWL-PE.COM 2888 Loker Avenue East, Suite 217, Carlsbad, CA 92010 I Tel. 760.929.2288 I Email. info@HWL-PE.COM CJ) ~ ""Cl C 0 ~ ""Cl C 0 0 CJ) :§ [/) ·x w C 0 -~ ""Cl 0 ~ ""Cl C 0 cii w :::;; <( z w _J G:: ~ <( 0 l-o _J 0... w I-<( 0 w > <( (/) \ $ . " ~- ·"' .. \ \ .. " -< ;0 I I i 20 -------- nii111F ij SCALE: 1" = 20' ~ i i i 10 0 20 40 60 -- - _.I. 1 Hin,1. HOWES I WEILER I LANDY PLANNING & ENGINEERING DATE: Tel. 760.929.2288 Fax. 760.929.2287 2888 LOKER AVENUE EAST SUITE 217 CARLSBAD, CA 92010 LEGEM) Dal BASIN BOUNDARY SUBBASIN BOUNDARY ------ DRAINAGE DIRECTION DRAINAGE DESCRIPTION ACRES 0. CFS NODE EX IMPERVIOUS OAK AVE AND MADISON ST PRE-DEVELOPMENT CONDITION DRAINAGE EXHIBIT DRAWING: 1 /17 /19 SHEET 1 OF 1 Page | 11 of 77 DRAINAGE REPORT Madison Street & Oak Avenue San Diego County Rational Hydrology Program CIVILCADD/CIVILDESIGN Engineering Software,(c)1991-2009 Version 7.8 Rational method hydrology program based on San Diego County Flood Control Division 2003 hydrology manual Rational Hydrology Study Date: 12/11/18 ------------------------------------------------------------------------ Oak Ave. & Madison St. Pre-Development Condition 100-Year Storm Event ------------------------------------------------------------------------ ********* Hydrology Study Control Information ********** ------------------------------------------------------------------------ Program License Serial Number 6290 ------------------------------------------------------------------------ Rational hydrology study storm event year is 100.0 English (in-lb) input data Units used Map data precipitation entered: 6 hour, precipitation(inches) = 2.550 24 hour precipitation(inches) = 4.500 P6/P24 = 56.7% San Diego hydrology manual 'C' values used ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 5.000 to Point/Station 10.000 **** INITIAL AREA EVALUATION **** ______________________________________________________________________ Decimal fraction soil group A = 0.000 Decimal fraction soil group B = 1.000 Decimal fraction soil group C = 0.000 Decimal fraction soil group D = 0.000 [UNDISTURBED NATURAL TERRAIN ] (Permanent Open Space ) Impervious value, Ai = 0.000 Sub-Area C Value = 0.250 Initial subarea total flow distance = 50.000(Ft.) Highest elevation = 53.800(Ft.) Lowest elevation = 52.900(Ft.) Elevation difference = 0.900(Ft.) Slope = 1.800 % INITIAL AREA TIME OF CONCENTRATION CALCULATIONS: The maximum overland flow distance is 85.00 (Ft) for the top area slope value of 1.80 %, in a development type of Permanent Open Space In Accordance With Figure 3-3 Initial Area Time of Concentration = 11.60 minutes TC = [1.8*(1.1-C)*distance(Ft.)^.5)/(% slope^(1/3)] TC = [1.8*(1.1-0.2500)*( 85.000^.5)/( 1.800^(1/3)]= 11.60 Rainfall intensity (I) = 3.905(In/Hr) for a 100.0 year storm Effective runoff coefficient used for area (Q=KCIA) is C = 0.250 www.HWL-PE.COM 2888 Loker Avenue East, Suite 217, Carlsbad, CA 92010 I Tel. 760.929.2288 I Email. info@HWL-PE.COM Page | 12 of 77 DRAINAGE REPORT Madison Street & Oak Avenue Subarea runoff = 0.039(CFS) Total initial stream area = 0.040(Ac.) ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 10.000 to Point/Station 15.000 **** SUBAREA FLOW ADDITION **** ______________________________________________________________________ Rainfall intensity (I) = 3.905(In/Hr) for a 100.0 year storm User specified 'C' value of 0.270 given for subarea Time of concentration = 11.60 min. Rainfall intensity = 3.905(In/Hr) for a 100.0 year storm Effective runoff coefficient used for total area (Q=KCIA) is C = 0.266 CA = 0.048 Subarea runoff = 0.148(CFS) for 0.140(Ac.) Total runoff = 0.187(CFS) Total area = 0.180(Ac.) ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 15.000 to Point/Station 15.000 **** CONFLUENCE OF MINOR STREAMS **** ______________________________________________________________________ Along Main Stream number: 1 in normal stream number 1 Stream flow area = 0.180(Ac.) Runoff from this stream = 0.187(CFS) Time of concentration = 11.60 min. Rainfall intensity = 3.905(In/Hr) Summary of stream data: Stream Flow rate TC Rainfall Intensity No. (CFS) (min) (In/Hr) 1 0.187 11.60 3.905 Qmax(1) = 1.000 * 1.000 * 0.187) + = 0.187 Total of 1 streams to confluence: Flow rates before confluence point: 0.187 Maximum flow rates at confluence using above data: 0.187 Area of streams before confluence: 0.180 Results of confluence: Total flow rate = 0.187(CFS) Time of concentration = 11.596 min. Effective stream area after confluence = 0.180(Ac.) End of computations, total study area = 0.180 (Ac.) www.HWL-PE.COM 2888 Loker Avenue East, Suite 217, Carlsbad, CA 92010 I Tel. 760.929.2288 I Email. info@HWL-PE.COM Page | 13 of 77 DRAINAGE REPORT Madison Street & Oak Avenue APPENDIX 2 Developed Conditions Calculations & Drainage Map www.HWL-PE.COM 2888 Loker Avenue East, Suite 217, Carlsbad, CA 92010 I Tel. 760.929.2288 I Email. info@HWL-PE.COM CJ) ~ <J c 0 :;:; '6 C 0 0 <J Q) rn 0 0.. 0 L... 0... C 0 -~ <J 0 ::::;: <J C 0 .::£ 0 0 / >-t, 0 _J 0 Cl: ----0 >-:r: / (f) I-Cl: 0 0... w Cl: / _J 5 0 / z 0 (f) 0 <( ::::;: 0 z <( :::.:: <( 0 0 N Ol / (f) I-0 w --, 0 Cl: 0.. / cii w ::::;: <( I ' I ~ ~ fi? ®49.81 FL \ I Q100=0.54 cfs \ z w _J [;:: I V 100=2.77 fps ' I I Ol 0 I N " N I N " I w I-<( 0 I-0 _J 0... Ol 0 N " r---.:::::_ ~ w I-<( 0 w > <( (f) .. . ., ... I ·.· .. I .. I I I .. . I ... I I I i 20 .. . • \I> -----/ -----___ /_ \ \ \ \ \ \ "' ... ::::::::::::::::::::::: ... f'o'-"====-rr :::iII:lI!lllllI!lI!I:t:t.1-·: -----lJ-----' ..... -..-----~/~:::: :::::::):?/::::}:::::::::}:?/::?::::::: :-:-:::a::,·:,:-:-:-:::-;-:-~-::·:::. . I (J1 1rlllE 11'@1'1l'i~ @f li:/A\l'ilU,IBl/A\ll l\il/A\f ~@" 7rll'B! l@li~ v-l : 0.06 ,ao=0.32 ~Uli:1\1 ~7/ \\ 0.04 ..r0 23 I ACRES CFS 1w • \ ACRES CFS I I _,"--" I r-------------------------------------------------------------------------~ I I I lmrni ----- SCALE: 1" = 20' Hin,1. ~ i i i HOWES I WEILER I LANDY PLANNING & ENGINEERING Tel. 760.929.2288 Fax. 760.929.2287 10 0 20 40 60 2888 LOKER AVENUE EAST SUITE 217 CARLSBAD, CA 92010 ----- LEG9D Jlal BASIN BOUNDARY SUBBASIN BOUNDARY DRAINAGE DIRECTION RAISED PLANTERS DRAINAGE DESCRIPTION NODE □ BASIN ACRES 0,00 CFS 0 CONFLUENCE POINT C OAK AVE AND MADISON ST POST-DEVELOPMENT CONDITION DRAINAGE EXHIBIT DATE: DRAWING: 01 /17 /19 SHEET 1 OF 1 Page | 14 of 77 DRAINAGE REPORT Madison Street & Oak Avenue San Diego County Rational Hydrology Program CIVILCADD/CIVILDESIGN Engineering Software,(c)1991-2009 Version 7.8 Rational method hydrology program based on San Diego County Flood Control Division 2003 hydrology manual Rational Hydrology Study Date: 01/17/19 ------------------------------------------------------------------------ Oak ave and Madison Street Post-Development 100-Year Storm Event ------------------------------------------------------------------------ ********* Hydrology Study Control Information ********** ------------------------------------------------------------------------ Program License Serial Number 6290 ------------------------------------------------------------------------ Rational hydrology study storm event year is 100.0 English (in-lb) input data Units used Map data precipitation entered: 6 hour, precipitation(inches) = 2.550 24 hour precipitation(inches) = 4.500 P6/P24 = 56.7% San Diego hydrology manual 'C' values used BASIN A ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 5.000 to Point/Station 10.000 **** INITIAL AREA EVALUATION **** A.1____________________________________________________________________ Decimal fraction soil group A = 0.000 Decimal fraction soil group B = 1.000 Decimal fraction soil group C = 0.000 Decimal fraction soil group D = 0.000 [INDUSTRIAL area type ] (Limited Industrial ) Impervious value, Ai = 0.900 Sub-Area C Value = 0.840 Initial subarea total flow distance = 50.000(Ft.) Highest elevation = 53.500(Ft.) Lowest elevation = 52.750(Ft.) Elevation difference = 0.750(Ft.) Slope = 1.500 % INITIAL AREA TIME OF CONCENTRATION CALCULATIONS: The maximum overland flow distance is 70.00 (Ft) for the top area slope value of 1.50 %, in a development type of Limited Industrial In Accordance With Figure 3-3 Initial Area Time of Concentration = 3.42 minutes TC = [1.8*(1.1-C)*distance(Ft.)^.5)/(% slope^(1/3)] TC = [1.8*(1.1-0.8400)*( 70.000^.5)/( 1.500^(1/3)]= 3.42 Calculated TC of 3.421 minutes is less than 5 minutes, resetting TC to 5.0 minutes for rainfall intensity calculations Rainfall intensity (I) = 6.719(In/Hr) for a 100.0 year storm Effective runoff coefficient used for area (Q=KCIA) is C = 0.840 Subarea runoff = 0.226(CFS) Total initial stream area = 0.040(Ac.) www.HWL-PE.COM 2888 Loker Avenue East, Suite 217, Carlsbad, CA 92010 I Tel. 760.929.2288 I Email. info@HWL-PE.COM Page | 15 of 77 DRAINAGE REPORT Madison Street & Oak Avenue ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 10.000 to Point/Station 15.000 **** SUBAREA FLOW ADDITION **** A.2____________________________________________________________________ Calculated TC of 3.421 minutes is less than 5 minutes, resetting TC to 5.0 minutes for rainfall intensity calculations Rainfall intensity (I) = 6.719(In/Hr) for a 100.0 year storm User specified 'C' value of 0.790 given for subarea Time of concentration = 3.42 min. Rainfall intensity = 6.719(In/Hr) for a 100.0 year storm Effective runoff coefficient used for total area (Q=KCIA) is C = 0.810 CA = 0.081 Subarea runoff = 0.318(CFS) for 0.060(Ac.) Total runoff = 0.544(CFS) Total area = 0.100(Ac.) ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 10.000 to Point/Station 15.000 **** PIPEFLOW TRAVEL TIME (User specified size) **** ______________________________________________________________________ Upstream point/station elevation = 50.590(Ft.) Downstream point/station elevation = 49.850(Ft.) Pipe length = 105.00(Ft.) Slope = 0.0070 Manning's N = 0.012 No. of pipes = 1 Required pipe flow = 0.544(CFS) Given pipe size = 6.00(In.) NOTE: Normal flow is pressure flow in user selected pipe size. The approximate hydraulic grade line above the pipe invert is 0.280(Ft.) at the headworks or inlet of the pipe(s) Pipe friction loss = 0.841(Ft.) Minor friction loss = 0.179(Ft.) K-factor = 1.50 Pipe flow velocity = 2.77(Ft/s) Travel time through pipe = 0.63 min. Time of concentration (TC) = 4.05 min. ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 17.000 to Point/Station 17.000 **** SUBAREA FLOW ADDITION **** A.3___________________________________________________________________ Calculated TC of 4.052 minutes is less than 5 minutes, resetting TC to 5.0 minutes for rainfall intensity calculations Rainfall intensity (I) = 6.719(In/Hr) for a 100.0 year storm User specified 'C' value of 0.540 given for subarea Time of concentration = 4.05 min. Rainfall intensity = 6.719(In/Hr) for a 100.0 year storm Effective runoff coefficient used for total area (Q=KCIA) is C = 0.785 CA = 0.086 Subarea runoff = 0.036(CFS) for 0.010(Ac.) Total runoff = 0.580(CFS) Total area = 0.110(Ac.) ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 17.000 to Point/Station 17.000 **** CONFLUENCE OF MINOR STREAMS **** ______________________________________________________________________ www.HWL-PE.COM 2888 Loker Avenue East, Suite 217, Carlsbad, CA 92010 I Tel. 760.929.2288 I Email. info@HWL-PE.COM Page | 16 of 77 DRAINAGE REPORT Madison Street & Oak Avenue Along Main Stream number: 1 in normal stream number 1 Stream flow area = 0.110(Ac.) Runoff from this stream = 0.580(CFS) Time of concentration = 4.05 min. Rainfall intensity = 6.719(In/Hr) Summary of stream data: Stream Flow rate TC Rainfall Intensity No. (CFS) (min) (In/Hr) 1 0.580 4.05 6.719 Qmax(1) = 1.000 * 1.000 * 0.580) + = 0.580 Total of 1 streams to confluence: Flow rates before confluence point: 0.580 Maximum flow rates at confluence using above data: 0.580 Area of streams before confluence: 0.110 Results of confluence: Total flow rate = 0.580(CFS) Time of concentration = 4.052 min. Effective stream area after confluence = 0.110(Ac.) BASIN B ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 20.000 to Point/Station 25.000 **** INITIAL AREA EVALUATION **** B.1____________________________________________________________________ Decimal fraction soil group A = 0.000 Decimal fraction soil group B = 1.000 Decimal fraction soil group C = 0.000 Decimal fraction soil group D = 0.000 [HIGH DENSITY RESIDENTIAL ] (24.0 DU/A or Less ) Impervious value, Ai = 0.650 Sub-Area C Value = 0.670 Initial subarea total flow distance = 50.000(Ft.) Highest elevation = 53.300(Ft.) Lowest elevation = 52.300(Ft.) Elevation difference = 1.000(Ft.) Slope = 2.000 % Top of Initial Area Slope adjusted by User to 1.600 % INITIAL AREA TIME OF CONCENTRATION CALCULATIONS: The maximum overland flow distance is 75.00 (Ft) for the top area slope value of 1.60 %, in a development type of 24.0 DU/A or Less In Accordance With Figure 3-3 Initial Area Time of Concentration = 5.73 minutes TC = [1.8*(1.1-C)*distance(Ft.)^.5)/(% slope^(1/3)] TC = [1.8*(1.1-0.6700)*( 75.000^.5)/( 1.600^(1/3)]= 5.73 Rainfall intensity (I) = 6.153(In/Hr) for a 100.0 year storm Effective runoff coefficient used for area (Q=KCIA) is C = 0.670 Subarea runoff = 0.082(CFS) Total initial stream area = 0.020(Ac.) www.HWL-PE.COM 2888 Loker Avenue East, Suite 217, Carlsbad, CA 92010 I Tel. 760.929.2288 I Email. info@HWL-PE.COM Page | 17 of 77 DRAINAGE REPORT Madison Street & Oak Avenue ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 25.000 to Point/Station 30.000 **** SUBAREA FLOW ADDITION **** B.2____________________________________________________________________ Rainfall intensity (I) = 6.153(In/Hr) for a 100.0 year storm User specified 'C' value of 0.730 given for subarea Time of concentration = 5.73 min. Rainfall intensity = 6.153(In/Hr) for a 100.0 year storm Effective runoff coefficient used for total area (Q=KCIA) is C = 0.713 CA = 0.050 Subarea runoff = 0.225(CFS) for 0.050(Ac.) Total runoff = 0.307(CFS) Total area = 0.070(Ac.) ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 35.000 to Point/Station 35.000 **** CONFLUENCE OF MINOR STREAMS **** ______________________________________________________________________ Along Main Stream number: 1 in normal stream number 2 Stream flow area = 0.070(Ac.) Runoff from this stream = 0.307(CFS) Time of concentration = 5.73 min. Rainfall intensity = 6.153(In/Hr) Summary of stream data: Stream Flow rate TC Rainfall Intensity No. (CFS) (min) (In/Hr) 1 0.580 4.05 6.719 2 0.307 5.73 6.153 Qmax(1) = 1.000 * 1.000 * 0.580) + 1.000 * 0.707 * 0.307) + = 0.798 Qmax(2) = 0.916 * 1.000 * 0.580) + 1.000 * 1.000 * 0.307) + = 0.839 Total of 2 streams to confluence: Flow rates before confluence point: 0.580 0.307 Maximum flow rates at confluence using above data: 0.798 0.839 Area of streams before confluence: 0.110 0.070 Results of confluence: Total flow rate = 0.839(CFS) Time of concentration = 5.731 min. Effective stream area after confluence = 0.180(Ac.) End of computations, total study area = 0.180 (Ac.) www.HWL-PE.COM 2888 Loker Avenue East, Suite 217, Carlsbad, CA 92010 I Tel. 760.929.2288 I Email. info@HWL-PE.COM Page | 18 of 77 DRAINAGE REPORT Madison Street & Oak Avenue APPENDIX 3 Storm Water Standard Project Requirements www.HWL-PE.COM 2888 Loker Avenue East, Suite 217, Carlsbad, CA 92010 I Tel. 760.929.2288 I Email. info@HWL-PE.COM E-34 Page 1 of 4 REV 02/16 Development Services Land Development Engineering 1635 Faraday Avenue (760) 602-2750 www.carlsbadca.gov STORM WATER STANDARDS QUESTIONNAIRE E-34 INSTRUCTIONS: To address post-development pollutants that may be generated from development projects, the city requires that new development and significant redevelopment priority projects incorporate Permanent Storm Water Best Management Practices (BMPs) into the project design per Carlsbad BMP Design Manual (BMP Manual). To view the BMP Manual, refer to the Engineering Standards (Volume 5). This questionnaire must be completed by the applicant in advance of submitting for a development application (subdivision, discretionary permits and/or construction permits). The results of the questionnaire determine the level of storm water standards that must be applied to a proposed development or redevelopment project. Depending on the outcome, your project will either be subject to ‘STANDARD PROJECT’ requirements or be subject to ‘PRIORITY DEVELOPMENT PROJECT’ (PDP) requirements. Your responses to the questionnaire represent an initial assessment of the proposed project conditions and impacts. City staff has responsibility for making the final assessment after submission of the development application. If staff determines that the questionnaire was incorrectly filled out and is subject to more stringent storm water standards than initially assessed by you, this will result in the return of the development application as incomplete. In this case, please make the changes to the questionnaire and resubmit to the city. If you are unsure about the meaning of a question or need help in determining how to respond to one or more of the questions, please seek assistance from Land Development Engineering staff. A completed and signed questionnaire must be submitted with each development project application. Only one completed and signed questionnaire is required when multiple development applications for the same project are submitted concurrently. PROJECT INFORMATION PROJECT NAME: PROJECT ID: ADDRESS: APN: The project is (check one): New Development Redevelopment The total proposed disturbed area is: ________ ft2 (________) acres The total proposed newly created and/or replaced impervious area is: ________ ft2 (________) acres If your project is covered by an approved SWQMP as part of a larger development project, provide the project ID and the SWQMP # of the larger development project: Project ID SWQMP #: Then, go to Step 1 and follow the instructions. When completed, sign the form at the end and submit this with your application to the city. X 7,929 0.18 201-031-01-00 AND 204-031-02-00Southeast corner of Madison Street and Oak Avenue Oak Ave. & Madison St. 6,088 0.14 C cityof Carlsbad □ □ E-34 Page 2 of 4 REV 04/17 STEP 1 TO BE COMPLETED FOR ALL PROJECTS To determine if your project is a “development project”, please answer the following question: YES NO Is your project LIMITED TO routine maintenance activity and/or repair/improvements to an existing building or structure that do not alter the size (See Section 1.3 of the BMP Design Manual for guidance)? If you answered “yes” to the above question, provide justification below then go to Step 5, mark the third box stating “my project is not a ‘development project’ and not subject to the requirements of the BMP manual” and complete applicant information. Justification/discussion: (e.g. the project includes only interior remodels within an existing building): If you answered “no” to the above question, the project is a ‘development project’, go to Step 2. STEP 2 TO BE COMPLETED FOR ALL DEVELOPMENT PROJECTS To determine if your project is exempt from PDP requirements pursuant to MS4 Permit Provision E.3.b.(3), please answer the following questions: Is your project LIMITED to one or more of the following: YES NO 1.Constructing new or retrofitting paved sidewalks, bicycle lanes or trails that meet the following criteria: a)Designed and constructed to direct storm water runoff to adjacent vegetated areas, or other non- erodible permeable areas; b)Designed and constructed to be hydraulically disconnected from paved streets or roads; c)Designed and constructed with permeable pavements or surfaces in accordance with USEPA Green Streets guidance? 2.Retrofitting or redeveloping existing paved alleys, streets, or roads that are designed and constructed in accordance with the USEPA Green Streets guidance? 3.Ground Mounted Solar Array that meets the criteria provided in section 1.4.2 of the BMP manual? If you answered “yes” to one or more of the above questions, provide discussion/justification below, then go to Step 5, mark the second box stating “my project is EXEMPT from PDP …” and complete applicant information. Discussion to justify exemption ( e.g. the project redeveloping existing road designed and constructed in accordance with the USEPA Green Street guidance): If you answered “no” to the above questions, your project is not exempt from PDP, go to Step 3. X X X X □ □ □ □ □ □ □ □ E-34 Page 3 of 4 REV 04/17 STEP 3 TO BE COMPLETED FOR ALL NEW OR REDEVELOPMENT PROJECTS To determine if your project is a PDP, please answer the following questions (MS4 Permit Provision E.3.b.(1)): YES NO 1.Is your project a new development that creates 10,000 square feet or more of impervious surfaces collectively over the entire project site? This includes commercial, industrial, residential, mixed-use, and public development projects on public or private land. 2.Is your project a redevelopment project creating and/or replacing 5,000 square feet or more of impervious surface collectively over the entire project site on an existing site of 10,000 square feet or more of impervious surface? This includes commercial, industrial, residential, mixed-use, and public development projects on public or private land. 3.Is your project a new or redevelopment project that creates and/or replaces 5,000 square feet or more of impervious surface collectively over the entire project site and supports a restaurant? A restaurant is a facility that sells prepared foods and drinks for consumption, including stationary lunch counters and refreshment stands selling prepared foods and drinks for immediate consumption (Standard Industrial Classification (SIC) code 5812). 4.Is your project a new or redevelopment project that creates 5,000 square feet or more of impervious surface collectively over the entire project site and supports a hillside development project? A hillside development project includes development on any natural slope that is twenty-five percent or greater. 5.Is your project a new or redevelopment project that creates and/or replaces 5,000 square feet or more of impervious surface collectively over the entire project site and supports a parking lot? A parking lot is a land area or facility for the temporary parking or storage of motor vehicles used personally for business or for commerce. 6.Is your project a new or redevelopment project that creates and/or replaces 5,000 square feet or more of impervious street, road, highway, freeway or driveway surface collectively over the entire project site? A street, road, highway, freeway or driveway is any paved impervious surface used for the transportation of automobiles, trucks, motorcycles, and other vehicles. 7.Is your project a new or redevelopment project that creates and/or replaces 2,500 square feet or more of impervious surface collectively over the entire site, and discharges directly to an Environmentally Sensitive Area (ESA)? “Discharging Directly to” includes flow that is conveyed overland a distance of 200 feet or less from the project to the ESA, or conveyed in a pipe or open channel any distance as an isolated flow from the project to the ESA (i.e. not commingled with flows from adjacent lands).* 8.Is your project a new development or redevelopment project that creates and/or replaces 5,000 square feet or more of impervious surface that supports an automotive repair shop? An automotive repair shop is a facility that is categorized in any one of the following Standard Industrial Classification (SIC) codes: 5013, 5014, 5541, 7532-7534, or 7536-7539. 9.Is your project a new development or redevelopment project that creates and/or replaces 5,000 square feet or more of impervious area that supports a retail gasoline outlet (RGO)? This category includes RGO’s that meet the following criteria: (a) 5,000 square feet or more or (b) a project Average Daily Traffic (ADT) of 100 or more vehicles per day. 10.Is your project a new or redevelopment project that results in the disturbance of one or more acres of land and are expected to generate pollutants post construction? 11.Is your project located within 200 feet of the Pacific Ocean and (1) creates 2,500 square feet or more of impervious surface or (2) increases impervious surface on the property by more than 10%? (CMC 21.203.040) If you answered “yes” to one or more of the above questions, your project is a PDP. If your project is a redevelopment project, go to step 4. If your project is a new project, go to step 5, check the first box stating “My project is a PDP …” and complete applicant information. If you answered “no” to all of the above questions, your project is a ‘STANDARD PROJECT.’ Go to step 5, check the second box stating “My project is a ‘STANDARD PROJECT’…” and complete applicant information. X X X X X X X X X X X □ □ □ □ □ □ □ □ □ □ □ □ □ □ □ □ □ □ □ □ □ □ E-34 Page 4 of 4 REV 04/17 STEP 4 TO BE COMPLETED FOR REDEVELOPMENT PROJECTS THAT ARE PRIORITY DEVELOPMENT PROJECTS (PDP) ONLY Complete the questions below regarding your redevelopment project (MS4 Permit Provision E.3.b.(2)): YES NO Does the redevelopment project result in the creation or replacement of impervious surface in an amount of less than 50% of the surface area of the previously existing development? Complete the percent impervious calculation below: Existing impervious area (A) = __________________________ sq. ft. Total proposed newly created or replaced impervious area (B) = _________________________sq. ft. Percent impervious area created or replaced (B/A)*100 = __________% If you answered “yes”, the structural BMPs required for PDP apply only to the creation or replacement of impervious surface and not the entire development. Go to step 5, check the first box stating “My project is a PDP …” and complete applicant information. If you answered “no,” the structural BMP’s required for PDP apply to the entire development. Go to step 5, check the check the first box stating “My project is a PDP …” and complete applicant information. STEP 5 CHECK THE APPROPRIATE BOX AND COMPLETE APPLICANT INFORMATION My project is a PDP and must comply with PDP stormwater requirements of the BMP Manual. I understand I must prepare a Storm Water Quality Management Plan (SWQMP) for submittal at time of application. My project is a ‘STANDARD PROJECT’ OR EXEMPT from PDP and must only comply with ‘STANDARD PROJECT’ stormwater requirements of the BMP Manual. As part of these requirements, I will submit a “Standard Project Requirement Checklist Form E-36” and incorporate low impact development strategies throughout my project. Note: For projects that are close to meeting the PDP threshold, staff may require detailed impervious area calculations and exhibits to verify if ‘STANDARD PROJECT’ stormwater requirements apply. My Project is NOT a ‘development project’ and is not subject to the requirements of the BMP Manual. Applicant Information and Signature Box Applicant Name: Applicant Title: Applicant Signature: Date: * Environmentally Sensitive Areas include but are not limited to all Clean Water Act Section 303(d) impaired water bodies; areas designated as Areas of Special Biological Significance by the State Water Resources Control Board (Water Quality Control Plan for the San Diego Basin (1994) and amendments); water bodies designated with the RARE beneficial use by the State Water Resources Control Board (Water Quality Control Plan for the San Diego Basin (1994) and amendments); areas designated as preserves or their equivalent under the Multi Species Conservation Program within the Cities and County of San Diego; Habitat Management Plan; and any other equivalent environmentally sensitive areas which have been identified by the City. This Box for City Use Only City Concurrence: YES NO By: Date: Project ID: X OwnerDk Realty Holdings □ □ □ □ □ □ □ E-36 Page 1 of 4 Revised 09/16 Development Services Land Development Engineering 1635 Faraday Avenue (760) 602-2750 www.carlsbadca.gov STANDARD PROJECT REQUIREMENT CHECKLIST E-36 Project Information Project Name: Project ID: DWG No. or Building Permit No.: Source Control BMPs All development projects must implement source control BMPs SC-1 through SC-6 where applicable and feasible. See Chapter 4 and Appendix E.1 of the BMP Design Manual (Volume 5 of City Engineering Standards) for information to implement source control BMPs shown in this checklist. Answer each category below pursuant to the following.  "Yes" means the project will implement the source control BMP as described in Chapter 4 and/or Appendix E.1 of the Model BMP Design Manual. Discussion/justification is not required.  "No" means the BMP is applicable to the project but it is not feasible to implement. Discussion/justification must be provided. Please add attachments if more space is needed.  "N/A" means the BMP is not applicable at the project site because the project does not include the feature that is addressed by the BMP (e.g., the project has no outdoor materials storage areas). Discussion/justification may be provided. Source Control Requirement Applied? SC-1 Prevention of Illicit Discharges into the MS4 Yes No N/A Discussion/justification if SC-1 not implemented: SC-2 Storm Drain Stenciling or Signage Yes No N/A Discussion/justification if SC-2 not implemented: SC-3 Protect Outdoor Materials Storage Areas from Rainfall, Run-On, Runoff, and Wind Dispersal Yes No N/A Discussion/justification if SC-3 not implemented: C cityof Carlsbad □ □ □ □ □ □ □ □ □ E-36 Page 2 of 4 Revised 09/16 Source Control Requirement (continued) Applied? SC-4 Protect Materials Stored in Outdoor Work Areas from Rainfall, Run-On, Runoff, and Wind Dispersal Yes No N/A Discussion/justification if SC-4 not implemented: SC-5 Protect Trash Storage Areas from Rainfall, Run-On, Runoff, and Wind Dispersal Yes No N/A Discussion/justification if SC-5 not implemented: SC-6 Additional BMPs based on Potential Sources of Runoff Pollutants must answer for each source listed below and identify additional BMPs. (See Table in Appendix E.1 of BMP Manual for guidance). On-site storm drain inlets Yes No N/A Interior floor drains and elevator shaft sump pumps Yes No N/A Interior parking garages Yes No N/A Need for future indoor & structural pest control Yes No N/A Landscape/Outdoor Pesticide Use Yes No N/A Pools, spas, ponds, decorative fountains, and other water features Yes No N/A Food service Yes No N/A Refuse areas Yes No N/A Industrial processes Yes No N/A Outdoor storage of equipment or materials Yes No N/A Vehicle and Equipment Cleaning Yes No N/A Vehicle/Equipment Repair and Maintenance Yes No N/A Fuel Dispensing Areas Yes No N/A Loading Docks Yes No N/A Fire Sprinkler Test Water Yes No N/A Miscellaneous Drain or Wash Water Yes No N/A Plazas, sidewalks, and parking lots Yes No N/A For “Yes” answers, identify the additional BMP per Appendix E.1. Provide justification for “No” answers. □ □ □ □ □ □ □ □ □ □ □ □ □ □ □ □ □ □ □ □ □ □ □ □ □ □ □ □ □ □ □ □ □ □ □ □ □ □ □ □ □ □ □ □ □ □ □ □ □ □ □ □ □ □ □ □ □ □ □ □ □ □ □ □ □ □ □ □ □ □ □ □ □ □ E-36 Page 3 of 4 Revised 09/16 Site Design BMPs All development projects must implement site design BMPs SD-1 through SD-8 where applicable and feasible. See Chapter 4 and Appendix E.2 thru E.6 of the BMP Design Manual (Volume 5 of City Engineering Standards) for information to implement site design BMPs shown in this checklist. Answer each category below pursuant to the following.  "Yes" means the project will implement the site design BMPs as described in Chapter 4 and/or Appendix E.2 thru E.6 of the Model BMP Design Manual. Discussion / justification is not required.  "No" means the BMPs is applicable to the project but it is not feasible to implement. Discussion/justification must be provided. Please add attachments if more space is needed.  "N/A" means the BMPs is not applicable at the project site because the project does not include the feature that is addressed by the BMPs (e.g., the project site has no existing natural areas to conserve). Discussion/justification may be provided. Site Design Requirement Applied? SD-1 Maintain Natural Drainage Pathways and Hydrologic Features Yes No N/A Discussion/justification if SD-1 not implemented: SD-2 Conserve Natural Areas, Soils, and Vegetation Yes No N/A Discussion/justification if SD-2 not implemented: SD-3 Minimize Impervious Area Yes No N/A Discussion/justification if SD-3 not implemented: SD-4 Minimize Soil Compaction Yes No N/A Discussion/justification if SD-4 not implemented: SD-5 Impervious Area Dispersion Yes No N/A Discussion/justification if SD-5 not implemented: I ID ID ID ID ID ID ID ID ID ID ID ID ID ID ID E-36 Page 4 of 4 Revised 09/16 Site Design Requirement (continued) Applied? SD-6 Runoff Collection Yes No N/A Discussion/justification if SD-6 not implemented: SD-7 Landscaping with Native or Drought Tolerant Species Yes No N/A Discussion/justification if SD-7 not implemented: SD-8 Harvesting and Using Precipitation Yes No N/A Discussion/justification if SD-8 not implemented: I ID ID ID ID ID ID ID ID ID Page | 19 of 77 DRAINAGE REPORT Madison Street & Oak Avenue APPENDIX 4 Maps and Charts www.HWL-PE.COM 2888 Loker Avenue East, Suite 217, Carlsbad, CA 92010 I Tel. 760.929.2288 I Email. info@HWL-PE.COM Oak Avenue and Madison Street 1/17/2019 Basin ID Total Area (ac) Pervious Area - Soil Type B (sq-ft) Impervious Area - Soil Type B (sq-ft)% Impervious % Pervious Weighted Runoff Coeff C: A.1 0.05 1963 0 100%0%0.25 A.2 0.14 5806 158 97%3%0.27 Total 0.18 AC B 0.90 0.25 Basin ID Total Area (ac) Pervious Area - Soil Type B (sq-ft) Impervious Area - Soil Type B (sq-ft)% Impervious % Pervious Weighted Runoff Coef C: A.1 0.04 91 1434 6%94%0.86 A.2 0.06 477 2333 17%83%0.79 A.3 0.01 327 266 55%45%0.54 B.1 0.02 370 670 36%64%0.67 B.2 0.05 558 1627 26%74%0.73 Total 0.18 AC Impervious Pervious (landscape) Soil Type Pre-Project Drainage Post-Project Drainage Runoff Coefficient Table S:\PROJECTS\19201 OAK AND MADISON\CIVIL\REPORTS\HYDROLOGY\Appendix B - Weighted Runoff Coefficient\Oak and Madison_drn_calcs.xlsx Page | 20 of 77 DRAINAGE REPORT Madison Street & Oak Avenue --Watershed D~ivide -------------"\ '-. \~ / \ "· \ --··-~----··-···~----· ---....___ /'.-....___ '----------t----------------L-----------------t Watershed Divide Effective Slope Line O.sig.n Point (Watershed Outlet) 1----------------l ---------------->! Area "A"= Area "8 "' SOURCE:: ~lifomi::i DM:.ion of~~ (1011) :,,ncl Kirpioh {10t0) Oulgn Point FICURE Computation of Effective Slope for Natural Watersheds 39 ~ www.HWL-PE.C0M 2888 Loker Avenue tast, Swte 217, Carlsbad. GA 92010 I !el. 760.929.2288 J t,.,a,I. ,nto@HWL·Pt.COM Page | 21 of 77 DRAINAGE REPORT Madison Street & Oak Avenue i :x ~ ;!I 8 ;=: "' 0) 0) 0) ~ ~ )> ~ ~ C: :, g, ~ ff 5· !::1 "' ~ ;;; _[ ~ ill 0 0 ~ ! "' ,,, " "' 0) 0) !::I ~. ~ 3· 0 @· I ~ r. ;!I () 0 ;;: ,-. w w IL ?; w u z ;:; ~ w (/) Q'. ::, 0 0 "' w i 1001 1-5 I H/J/., ~ ~, ~ / I ,.,I =---1' I JO (/) w ,-. ::, z 20 ~ ?; w ::;; .= ~ ..J u.. 10 o s Q'. w > 0 -0 EXAMPLE: Given: Watercourse Distance (D} = 70 Feel Slope (s) =1.3% Runoff Coefficient (C) = 0.41 OV81land FIOIV Time (T) : 9.S Minutes T= 1.8(1.1-C)'Jo •rs SOURCE: A1rpor1 D<ainage, Federal A111ation AdministraWon, 196S Rational Formula -Overland Time of Flow Nomograph 43 FIGURE 3-3 Page | 23 of 77 DRAINAGE REPORT Madison Street & Oak Avenue 6E FHl 5000 4000 EQUATION Tc "' (1t~))°'385 Tc • Time or coocen1retlon (hOursJ L Walerc;ounMJ Distilflce (mlle.) Ci.E • Change In elevatlon along effective slope line (See F-.gure 3-5)(1eet) 3000 woo 1000 ' :iOO' 400 300 200 100 JD 20 10 5 6 E ' ' ,i~ ''°" ' ' ' ' ' ' SOURCE: California Dilli&IOn c:( Highways (1941) and Klrplch (1940) ' ' L MIias Feet '1 4000 3000 0"5 ' 2000 1800 1800 1~ 1200 1000 900 800 700 600 500 ~ 300 200 L ' Nomogroph for Determination of Tc Hour5 Minutes 4 3 2 40 JO 20 18 UI 1• ' ' 12 ' ' 10 ' 9 a 7 6 5 4 3 Tc lime of Concentrotion (Tc) or Travel Time [Tt) for Natural Wotersheds 2'<1 www.HWL-PE.COM 2888 Loker Avenue East, Suite 217. Carlsbad, CA 92010 I Tel. 760.929.2288 I Email. info@HWL-PE.COM I J Q g, � ,-..... - 32°30 G) ii'> � :t � N-...,. ,-'T I � J � j JC -0 v e Li, 0 ,. co g, t" i Ii'--(0 (0 ..-..-,+-..,.. ' ' ::.� -2 31�·------t----t--t-t-H-+-++++-H--t---$+++-+-H-+++--1----+-H---+-1J�'O, ---l---+-+-H---+---l-----l-----1-----1-----1------1---l------t-;G>-+--+--+-+-+----+--+--+--+--+-+-+----+--+-�,-+--+-+-+----+-----+--+-+---,·--+--+-'-+--+--,■:+-t-t-+-+-+-+-+-+-1--+-+-+--+-+-��, r? t"c-' -+--+-+----+-----+--+-+--+--+-+-+----+--+----1 ■ ..,.. ...,.. ,-�.-----t--+--+-+-+-1--+-+-+-+-+-+-t-t-!uµ'.I.: -+-+-+-+-+-1--+-+-+--+-+-+-1---+-(0 ...,. =--+--+--+-+-t-t--+--+--+--+-+-+-1-----, ■ ,-i ,- County of San Diego Hydrology Manual ... Rainfall Isopluvials 100 Year Rainfall Event- 6 Hours 3 �- lsopluvial (inches) THIS MAP IS PROVIDED WITHOLIT WARRANTY OF ANY KIND, EITHER EXPRESS OR IMPLIED, INCLUDING, BUT NOT LIMITED TO, THE IMPLIED WARRANTIES OF MERCHANTABILITY AND FITNESS FOR A PARTICULAR PURPOSE, Copyright SanGIS. All Rights: Reserved. This products may contain infonnation from the BANDAG Regional Information System which cannot be reproduced without the written permission of SANDAG. Thia product may contain information which has been reproduced with permission granted by Thomas Brothen!; Maps. 3 Miles I I ■ -I DPW ~GIS I I I I I s IJ IJl_...'._J---LIJ_J_J_l._j--f--~--!-l ---l-,4 ~14+-f--+-Lf-----~I _I_____J_~_!_~-'-+,-'-.-i-"-~1-+-1_:__~_:__l~---'---+---'--11-~~,1 ~ • 0 •-r--r--1-+ + ---r+-~ J + ~ r+r t t I l ,, I I I II I I • ~ ,-µJ == --=--+-: +---~+----,--1,-...,....-,1 e--+IT ~;--+--r-:---t-~-+-~-+-t ~ +-1+-cl +--+-l L ~--:-:r ---t-:--L-~--+--1-1 +-+-f--j--j--l -+l--t-t[-------1-1 ~ ~I i'-+-t-l-+-1-+-I~' -+--I -i--1 r-+-T rrl T -t-1+-tl--+-'-t-1 1 I I I I e,at.1:itlV Op si>-NDIEGQ s1JGIS Vi/c Have San Diep> Covcrcdi County of San Diego Hydrology Manual Rainfall Isopluvials 100 Year Rainfall Event-24 Hours --------lsopluvial (inches) Hydrologic Soil Group—San Diego County Area, California Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 12/7/2018 Page 1 of 436690203669028366903636690443669052366906036690683669020366902836690363669044366905236690603669068467757467765467773467781467789467797467805467813467821467829467837 467757 467765 467773 467781 467789 467797 467805 467813 467821 467829 467837 33° 9' 35'' N 117° 20' 44'' W33° 9' 35'' N117° 20' 41'' W33° 9' 34'' N 117° 20' 44'' W33° 9' 34'' N 117° 20' 41'' WN Map projection: Web Mercator Corner coordinates: WGS84 Edge tics: UTM Zone 11N WGS84 0 15 30 60 90Feet 0 5 10 20 30Meters Map Scale: 1:379 if printed on A landscape (11" x 8.5") sheet. Soil Map may not be valid at this scale. USDA = MAP LEGEND MAP INFORMATION Area of Interest (AOI) Area of Interest (AOI) Soils Soil Rating Polygons A A/D B B/D C C/D D Not rated or not available Soil Rating Lines A A/D B B/D C C/D D Not rated or not available Soil Rating Points A A/D B B/D C C/D D Not rated or not available Water Features Streams and Canals Transportation Rails Interstate Highways US Routes Major Roads Local Roads Background Aerial Photography The soil surveys that comprise your AOI were mapped at 1:24,000. Warning: Soil Map may not be valid at this scale. Enlargement of maps beyond the scale of mapping can cause misunderstanding of the detail of mapping and accuracy of soil line placement. The maps do not show the small areas of contrasting soils that could have been shown at a more detailed scale. Please rely on the bar scale on each map sheet for map measurements. Source of Map: Natural Resources Conservation Service Web Soil Survey URL: Coordinate System: Web Mercator (EPSG:3857) Maps from the Web Soil Survey are based on the Web Mercator projection, which preserves direction and shape but distorts distance and area. A projection that preserves area, such as the Albers equal-area conic projection, should be used if more accurate calculations of distance or area are required. This product is generated from the USDA-NRCS certified data as of the version date(s) listed below. Soil Survey Area: San Diego County Area, California Survey Area Data: Version 13, Sep 12, 2018 Soil map units are labeled (as space allows) for map scales 1:50,000 or larger. Date(s) aerial images were photographed: Nov 3, 2014—Nov 22, 2014 The orthophoto or other base map on which the soil lines were compiled and digitized probably differs from the background imagery displayed on these maps. As a result, some minor shifting of map unit boundaries may be evident. Hydrologic Soil Group—San Diego County Area, California Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 12/7/2018 Page 2 of 4USDA = □ D D D D D D D D ,,..,,,. ,,..,,,. □ ■ ■ □ □ ,,..._, t-+-t ~ tllWI ,..,,. ~ • Hydrologic Soil Group Map unit symbol Map unit name Rating Acres in AOI Percent of AOI MlC Marina loamy coarse sand, 2 to 9 percent slopes B 0.3 100.0% Totals for Area of Interest 0.3 100.0% Description Hydrologic soil groups are based on estimates of runoff potential. Soils are assigned to one of four groups according to the rate of water infiltration when the soils are not protected by vegetation, are thoroughly wet, and receive precipitation from long-duration storms. The soils in the United States are assigned to four groups (A, B, C, and D) and three dual classes (A/D, B/D, and C/D). The groups are defined as follows: Group A. Soils having a high infiltration rate (low runoff potential) when thoroughly wet. These consist mainly of deep, well drained to excessively drained sands or gravelly sands. These soils have a high rate of water transmission. Group B. Soils having a moderate infiltration rate when thoroughly wet. These consist chiefly of moderately deep or deep, moderately well drained or well drained soils that have moderately fine texture to moderately coarse texture. These soils have a moderate rate of water transmission. Group C. Soils having a slow infiltration rate when thoroughly wet. These consist chiefly of soils having a layer that impedes the downward movement of water or soils of moderately fine texture or fine texture. These soils have a slow rate of water transmission. Group D. Soils having a very slow infiltration rate (high runoff potential) when thoroughly wet. These consist chiefly of clays that have a high shrink-swell potential, soils that have a high water table, soils that have a claypan or clay layer at or near the surface, and soils that are shallow over nearly impervious material. These soils have a very slow rate of water transmission. If a soil is assigned to a dual hydrologic group (A/D, B/D, or C/D), the first letter is for drained areas and the second is for undrained areas. Only the soils that in their natural condition are in group D are assigned to dual classes. Rating Options Aggregation Method: Dominant Condition Hydrologic Soil Group—San Diego County Area, California Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 12/7/2018 Page 3 of 4USDA = Aggregation is the process by which a set of component attribute values is reduced to a single value that represents the map unit as a whole. A map unit is typically composed of one or more "components". A component is either some type of soil or some nonsoil entity, e.g., rock outcrop. For the attribute being aggregated, the first step of the aggregation process is to derive one attribute value for each of a map unit's components. From this set of component attributes, the next step of the aggregation process derives a single value that represents the map unit as a whole. Once a single value for each map unit is derived, a thematic map for soil map units can be rendered. Aggregation must be done because, on any soil map, map units are delineated but components are not. For each of a map unit's components, a corresponding percent composition is recorded. A percent composition of 60 indicates that the corresponding component typically makes up approximately 60% of the map unit. Percent composition is a critical factor in some, but not all, aggregation methods. The aggregation method "Dominant Condition" first groups like attribute values for the components in a map unit. For each group, percent composition is set to the sum of the percent composition of all components participating in that group. These groups now represent "conditions" rather than components. The attribute value associated with the group with the highest cumulative percent composition is returned. If more than one group shares the highest cumulative percent composition, the corresponding "tie-break" rule determines which value should be returned. The "tie-break" rule indicates whether the lower or higher group value should be returned in the case of a percent composition tie. The result returned by this aggregation method represents the dominant condition throughout the map unit only when no tie has occurred. Component Percent Cutoff: None Specified Components whose percent composition is below the cutoff value will not be considered. If no cutoff value is specified, all components in the database will be considered. The data for some contrasting soils of minor extent may not be in the database, and therefore are not considered. Tie-break Rule: Higher The tie-break rule indicates which value should be selected from a set of multiple candidate values, or which value should be selected in the event of a percent composition tie. Hydrologic Soil Group—San Diego County Area, California Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 12/7/2018 Page 4 of 4~