Loading...
HomeMy WebLinkAbout; ; 2002 - 2003 Technical Appendix; 2002-10-08CITY OF CARLSBAD CALIFORNIA Capital Improvement Program Technical Appendix 2002-2003 to Buildout CIVIC PROJECTS Americans with Disabilities Act (ADA) Proiects Funding Matrix for ADA Projects ............................................................................................................................................. 1 Cannon Park ............................................................................................................................................................................ 2 Restroom Remodel at Holiday Park .......................................................................................................................................... 3 Miscellaneous Faclllty Modlflcations 4 .. .. ......................................................................................................................................... Administrative Facilitv Proiects Funding Matrix for Administrative Facility Projects .................................................................................................................... 5 City Hall ................................................................................................................................................................................... 6 Public Works Center ................................................................................................................................................................ 7 Police and Fire Facilitv Proiects Funding Matrix for Police and Fire Facility Projects ................................................................................................................. 8 Police and Fire CAD Implementation ........................................................................................................................................ 9 Police and Fire Training Facility Site Selection and Feasibility Study ...................................................................................... 10 Fire Station No . 3 (Relocation) .............................................................................................................................................. 11 Fire Station No . 5 Storage BuildinglRestrooms ...................................................................................................................... 12 Fire Station No . 6 (Permanent) .............................................................................................................................................. 13 Police Training Range - Relocation ........................................................................................................................................ 14 Librarv Facilitv Proiects .. Funding Matrix for Library Faclllty Projects ............................................................................................................................ 15 Cole Library Expansion .......................................................................................................................................................... 16 Miscellaneous Proiects Funding Matrix for Miscellaneous Projects ........................................................................................................................... 17 . Coastal Rail Trail ................................................................................................................................................................... 18 Downtown Rail Corridor Enhancement ................................................................................................................................... 19 Community Facllttles District #1 Administration ..................................................................................................................... 20 Public Works Inventory and Facilities Management Program ................................................................................................. 21 Carlsbad Senior Center Courtyard Renovation ....................................................................................................................... 22 ... Redevelopment Proiects Funding Matrix for Redevelopment Projects ........................................................................................................................... 23 Village Area Street Furniture and Planters 25 Downtown Street Lighting Enhancement Study 24 Village Public Parking Enhancement Program ....................................................................................................................... 26 Village Public Relations Campaign ......................................................................................................................................... 27 ...................................................................................................................... .............................................................................................................................. FACILITY MAINTENANCE PROJECTS Facility Maintenance Proiects Funding Matrix for Facility Maintenance Projects ................................................................................................................... 28 Asbestos Survey .................................................................................................................................................................... 29 Calavera Hills Center Office Expansion .................................................................................................................................. 30 Harding Center - Fans ........................................................................................................................................................... 31 Harding Center - Kitchen Remodel ........................................................................................................................................ 32 Miscellaneous City Facility Maintenance Projects ................................................................................................................... 33 Safety Center Bulldlng Improvements .................................................................................................................................... 34 Safety Center - Conference Center Refurbishment ................................................................................................................ 35 Senior Center - Recoat Roof .................................................................................................................................................. 36 Water District - Repair/Replace Concrete Entrance 38 Senior Center Floor Replacement 37 .. .......................................................................................................................................... ............................................................................................................... PARKS PROJECTS Citwvide Parks Proiects Funding Matrix for Citywide Parks Projects .......................................................................................................................... 39 Business Park Recreational Fachty 40 Carlsbad Munlclpal Golf Course 41 Veteran’s Memorial Park ....................................................................................................................................................... 42 .. ....................................................................................................................................... .. ............................................................................................................................................ Northwest Quadrant Parks Projects Funding Matrix for Northwest Quadrant Parks Projects .......................................................................................................... 43 Cannon Lake Park ................................................................................................................................................................. 44 Chase Field BathroomdSnackbar Building Replacement ....................................................................................................... 45 Hosp Grove/Buena Vista Lagoon Recreational Improvements 47 Holiday Park Playground Equipment 46 Kruger House Pre-School Tot Lot ........................................................................................................................................... 48 Miscellaneous Beach Access RepairkJpgrades ...................................................................................................................... 49 Park Site Development - Pine School .................................................................................................................................... 50 Swim Complex FiltratiodHeating Renovation ......................................................................................................................... 51 ...................................................................................................................................... ............................................................................................... ii Northeast Quadrant Parks Proiects Funding Matrix for Northeast Quadrant Parks Projects .......................................................................................................... 52 Larwin Community Park ......................................................................................................................................................... 53 Park Restoration and Acqulsltlon ........................................................................................................................................... 54 Park Site Acquwtlon .............................................................................................................................................................. 55 Park Site Development .......................................................................................................................................................... 56 ... ... Southwest Quadrant Parks Proiects Funding Matrix for Southwest Quadrant Parks Projects ........................................................................................................ 57 Aviara Community Park .......................................................................................................................................................... 58 Aviara Reimbursement Agreement ......................................................................................................................................... 59 Park Restoration and Acqulsltlon ............................................................................................................................................ 60 Poinsettia Community Park - Soccer Field Stairs 62 Poinsettia Community Park - Phase II 61 Poinsettia Park Synthetic Soccer Field ................................................................................................................................... 63 ... .................................................................................................................................... ................................................................................................................... Southeast Quadrant Parks Proiects Funding Matrix for Southeast Parks Projects ........................................................................................................................ 64 . Alga Norte Park Land Dedication/Acquisltlon 65 Alga Norte Park - Phase I ....................................................................................................................................................... 66 Alga Norte Park - Phase I1 (50 Meter Pool) ............................................................................................................................ 67 Leo Carrillo Park - Phases I & II) ............................................................................................................................................ 68 Leo Carrillo Park - Phase 111 .................................................................................................................................................... 69 Stagecoach Park Drain ........................................................................................................................................................... 70 .. ........................................................................................................................ Stagecoach Park Tennis Access ............................................................................................................................................ 71 DRAINAGE PROJECTS Drainaae Projects Funding Matrix for Drainage Projects .................................................................................................................................... 72 . . Aviara Parkway Storm Drain Reimbursement .......................................................................................................................... 73 Carlsbad Boulevard Storm Drain Replacement ...................................................................................................................... 74 College Boulevard Storm Drain .............................................................................................................................................. 75 Drainage Channel and Desiltation Basin/Cannon Road .......................................................................................................... 76 La Costa Avenue Storm Drain Replacement .......................................................................................................................... 77 Master Drainage Plan Update ................................................................................................................................................. 78 Miscellaneous Master Drainage Facllltles ............................................................................................................................... 79 Miscellaneous Road Subdrains .............................................................................................................................................. 80 South Carlsbad Village Storm Drain 82 Park Drive and Tamarack Avenue Storm Drain 81 Tamarack and El Camino Real Storm Drain and Siltation Basin ............................................................................................ 83 Tamarack and Sunnyhill Street Drainage Modifications .......................................................................................................... 84 Torrejon Place Storm Drain Relining ...................................................................................................................................... 85 ... ...................................................................................................................... ....................................................................................................................................... iii SEWER PROJECTS Encina Water Pollution Control Facilitv Proiects Funding Matrix for Encina Water Pollution Control Facility Projects ..................................................................................... 86 Building Improvements .......................................................................................................................................................... 87 Capital Acquisltlons Unit 1 88 Capital Planning Services ...................................................................................................................................................... 89 Cogeneration Project .............................................................................................................................................................. 90 Flow Equalization Project ...................................................................................................................................................... 91 Phase IV Expansion - Debt Service ........................................................................................................................................ 92 Phase V Expansion ............................................................................................................................................................... 93 Phase V Expansion - Interim Capacity .................................................................................................................................. 94 Plant Rehabilitation ................................................................................................................................................................ 95 Pump Station Interfaces ........................................................................................................................................................ 96 Technology Master Plan ........................................................................................................................................................ 97 .. ..................................................................................................................................................... Sewer Collection Svstem Proiects Funding Matrix for Sewer Collection System Projects ............................................................................................................ 98 Avenida Encinas Gravity Sewer .............................................................................................................................................. 99 Carlsbad Trunk Sewer Reaches VCTl A, VCTIB, VCTlC 101 Buena Vista Lift Station & Pump Addition 100 El Camino Real Sewer - Chestnut to Tamarack ................................................................................................................... 102 Forest Gravity Sewer ........................................................................................................................................................... 103 Home Plant Lift Station ......................................................................................................................................................... 104 La Costa Meadows Sewer Extension ................................................................................................................................... 105 La Golondrina Sewer Extension ........................................................................................................................................... 106 Nightshade Gravity Sewer Extension .................................................................................................................................... 107 North Agua Hedionda Interceptor Rehabilitation .................................................................................................................. 108 North Agua Hedionda Trunk Sewer Reach NAHTIA ............................................................................................................ 109 North Batiquitos Sewage Lift Station Modifications 111 North Batiquitos Interceptor Rehabilltation 110 Palmer Way Sewer Extension ............................................................................................................................................. 112 Poinsettia Lane Sewer Relocation ........................................................................................................................................ 113 Poinsettia Sewage Lift Station Odor and Noise Abatement .................................................................................................. 114 Sewer Access Hole Rehabllltatlon ........................................................................................................................................ 115 Sewer Connection Fee Update ............................................................................................................................................ 116 Sewer Lift Station - Miscellaneous Repairs & Upgrades ...................................................................................................... 117 Sewer Line RefurbishmenffReplacement .............................................................................................................................. 118 ............................................................................................................................ .................................................................................................... .. ........................................................................................................................... ............................................................................................................... ... iv Sewer Collection Svstem Proiects (Continuedl Master Plan Update .............................................................................................................................................................. 119 Sewer Monltorlng Program 120 .. ................................................................................................................................................... South Agua Hedionda Lift Station and Force Main ............................................................................................................... 121 VistdCarlsbad Interceptor Sewer Reaches VC5A, 5B to 11A ............................................................................................... 122 VistdCarlsbad Interceptor Sewer Reach VCI 1 B .................................................................................................................. 124 VistdCarlsbad Interceptor Sewer Reaches VCI 3 to VCI 5 ................................................................................................... 125 VistdCarlsbad Interceptor Agua Hedionda Lift Station (VC 12) ............................................................................................ 123 VistdCarlsbad Interceptor Sewer Rehabilitation Reaches 1 thru 3 ....................................................................................... 126 WATER PROJECTS Water Distribution System Proiects Funding Matrix for Water Distribution System Projects ......................................................................................................... 127 ....................................................................................................................................................... 580 Zone Secondary Supply 129 "D Reservoir - Phase II 128 680 Zone Supply ................................................................................................................................................................. 130 Aviara Parkway - Poinsettia Lane to Palomar Airport Road ............................ 1 .................................................................... 131 Cannon Road West Transmlsslon Main 133 ................................................................................................................................................ Calavera Hills Water Booster Station Standby Generator ..................................................................................................... 132 Carlsbad Boulevard - (Manzano Drive to Avenida Encinas) .............................................................................................. 134 College Boulevard from Cannon Road to Carlsbad Village Drive ......................................................................................... 135 College Boulevard (33" Line to Cannon Road) ..................................................................................................................... 137 College Boulevard Maerkle Reservoir to Agua Hedionda Creek ........................................................................................... 138 .. .............................................................................................................................. College Boulevard - El Camino Real to Agua Hedionda Creek ............................................................................................ 136 El Camino Real (Palomar Airport Road South) .................................................................................................................... 139 El Camino Real Crossing at Kelly Drive ............................................................................................................................... 140 El Camino Real Transmission Main - Lisa Street to Kelly Drive ............................................................................................ 141 El Camino Real Transmission Main from Faraday Avenue to Cougar Drive 143 El Carnino Real from Cassia to Poinsettia 142 El Fuerte (North of Loker) .................................................................................................................................................... 144 El Fuerte (Alga Road to Poinsettia Lane) .............................................................................................................................. 145 El Fuerte (Faraday to Maerkle Reservoir) ............................................................................................................................. 146 El Fuerte (Poinsettia Lane to Palomar Airport Road) ............................................................................................................ 147 Foussat Road Well Abandonment ........................................................................................................................................ 148 Lake Calavera Reservoir Improvements ............................................................................................................................... 149 ............................................................................................................................ ......................................................................... V Water Distribution System Proiects (Continued) Marron Road (Pressure Regulating Station to Oceanside) .................................................................................................. 150 Miscellaneous plpellne Replacements .................................................................................................................................. 151 Miscellaneous Storage Tank Repairs ................................................................................................................................... 152 Miscellaneous Water Reservoir Fencing ............................................................................................................................... 153 North Agua Hedionda Transmlssron Main 154 Oceanside Intertie Upgrade .................................................................................................................................................. 155 palomar Airport (North of Owens) ...................................................................................................................................... 156 poinsettia Lane from “D” Reservoir to Ambrosia Lane ........................................................................................................ 157 Poinsettia Lane/Cassia Road (El Camin0 Real to “D Reservoir) .......................................................................................... 158 Poinsettia Lane (El Fuerte to El Gamin0 Real) ..................................................................................................................... 159 poinsettia Lane (paseo Del Norte to Carlsbad Boulevard) .................................................................................................. 160 Pressure Regulating Station (Cannon Road and College Boulevard) .................................................................................. 161 Seawater Desallnatlon Programs 162 Tanglewood Pressure Reducing Station Replacement ......................................................................................................... 163 TAP No . 2 Reservoir ............................................................................................................................................................. 164 TAP Reservoir Exterior Palntlng ........................................................................................................................................... 165 Tri-Agency Pipeline Erosion Protection ................................................................................................................................ 166 Water Certificate of Participation (COP) Payments ............................................................................................................. 167 Water Operations Water Pump Project ................................................................................................................................ 168 Water System Intertie Connection ....................................................................................................................................... 169 Master plan Update .............................................................................................................................................................. 170 .. .. ............................................................................................................................ .. ......................................................................................................................................... .. Recvcled Water Proiects Funding Matrix for Recycled Water Projects ....................................................................................................................... 171 Debt Sewice on State Loan ................................................................................................................................................. 172 Industrial Park System ......................................................................................................................................................... 173 1-5 Recycled Water Transmlsslon Line 174 Recycled Water Program - Phase I1 Design Report ............................................................................................................. 175 phase 11 Treatment Faclllty 176 Recycled Water phase I1 - Pipelines .................................................................................................................................... 177 Recycled Water Phase I1 - Flow Equalization ...................................................................................................................... 178 Recycled Water phase 11 - pump Stations ........................................................................................................................... 179 Pump Station Upgrade ......................................................................................................................................................... 180 .. ................................................................................................................................ .. ................................................................................................................................................... vi CIRCULATION SYSTEM PROJECTS Traffic Siqnal Proiects Funding Matrix for Traffic Signal Projects . Sheet 1 ............................................................................................................. 181 Funding Matrix for Traffic Signal Projects . Sheet 2 .............................................................................................................. 182 Alga Road and Cazadero Drive ............................................................................................................................................ 183 Alga Road and Xana Way .................................................................................................................................................... 184 Aviara Parkway (Poinsettia Lane to El Camino Real) .......................................................................................................... 185 Calle Barcelona and Paseo Aliso .......................................................................................................................................... 186 Camino De Los Coches and La Costa Avenue 188 Calle Barcelona and Paseo Avellano 187 Camino Vida Roble and Yarrow Drive ................................................................................................................................. 189 Cannon Road and Avenida Encinas ..................................................................................................................................... 190 Cannon Road and College Boulevard ................................................................................................................................... 191 Carlsbad Boulevard and Avenida Encinas ........................................................................................................................... 192 Carlsbad Boulevard and Cherry Avenue ............................................................................................................................... 193 Carlsbad Boulevard and Oak Avenue ................................................................................................................................... 194 Carlsbad Boulevard and State Street ................................................................................................................................... 195 Carlsbad Village Drive and Chatharn Road ........................................................................................................................... 196 Carlsbad Village Drive and Avenida De Anita ....................................................................................................................... 197 Carlsbad Village Drive and Pontiac Drive ............................................................................................................................. 198 Carlsbad Village Drive Signal Re-Timing .............................................................................................................................. 199 College Boulevard and El Camino Real ............................................................................................................................... 200 College Boulevard and Carlsbad Village Drive ................................................................................................................... 201 College Boulevard and Tamarack Avenue (Lake Calavera Entrance) .................................................................................. 202 College Boulevard and Tamarack Avenue (N) ...................................................................................................................... 203 El Carnino Real Traffic Signal Rehabilitation ........................................................................................................................ 204 El Camino Real and Poinsettia Lane .................................................................................................................................. 205 El Camino Real Corridor Study ............................................................................................................................................. 206 Faraday Avenue and Cannon Road ...................................................................................................................................... 207 Faraday Avenue and Camino Hills Drive .............................................................................................................................. 208 Faraday Avenue and Orion Street ....................................................................................................................................... 209 Faraday Avenue and Priestly Drive ....................................................................................................................................... 210 Faraday Avenue and Rutherford Road ................................................................................................................................. 211 La Costa Avenue and Calle Madero ..................................................................................................................................... 212 La Costa Avenue and Nueva Castilla Way ........................................................................................................................... 213 Melrose Drive and La Costa Avenue .................................................................................................................................. 214 Monroe Street and Hosp Way .............................................................................................................................................. 215 .................................................................................................................................... .................................................................................................................... vii Traffic Siqnal Proiects (Continued) Palomar Airport Road and Melrose Drive ........................................................................................................................... 216 Paseo Del Norte and Car Country Drive ............................................................................................................................... 217 Poinsettia Lane and Brigantine Road ................................................................................................................................... 218 Poinsettia Lane and El Fuerte Street ................................................................................................................................... 219 Poinsettia Lane and Melrose Drive ...................................................................................................................................... 220 Poinsettia Lane and Paseo Escuela ..................................................................................................................................... 221 Poinsettia Lane and Snapdragon Drive ................................................................................................................................ 222 Rancho Santa Fe Road and Calle Juniper0 (Formerly Melrose Drive South) ....................................................................... 223 Rancho Santa Fe Road (Formerly Questhaven Road ......................................................................................................... 224 Tamarack Avenue and Pontiac Drive ................................................................................................................................... 225 Tamarack Avenue and Valley Street .................................................................................................................................... 226 Tamarack Avenue and Garfield Street ................................................................................................................................. 227 Tamarack Avenue and Highland Drive ................................................................................................................................ 228 Street Proiects Funding Matrix for Street Projects . Sheet 1 ........................................................................................................................ 229 . Funding Matrix for Street Projects . Sheet 2 ......................................................................................................................... 230 Alga Road Street Lighting Alicante Road to El Fuerte Street ................................................................................................ 231 Alga Road Medians .............................................................................................................................................................. 232 Avenida Encinas Widening South of Palomar Airport Road ................................................................................................. 233 B&TD#2 Aviara Parkway - Palomar Airport Road to Cobblestone Road .............................................................................. 234 B&TD#2 - Aviara Parkway to Black Rail Road ...................................................................................................................... 235 B&TD#2 Poinsettia Lane - Reach "C" (Black Rail Road to Zone 19 Boundary) .................................................................... 236 B&TD#2 Poinsettia Lane Reaches "E", "F & "G" (Cassia Road to El Camino Real) ............................................................ 237 B&TD#3 -Cannon Road West ............................................................................................................................................. 238 El Camino Real to Oceanside - Cannon Road Reach 4 ....................................................................................................... 239 Cannon Road Widening from 1-5 to Paseo Del Norte ......................................................................................................... 240 Carlsbad Boulevard Median Tamarack Avenue to Pine Avenue 242 Carlsbad Boulevard Encinas Creek Bridge Railing 241 Carlsbad Boulevard Pedestrian Access Study ...................................................................................................................... 243 Carlsbad Boulevard Realignment - Phase 1 ........................................................................................................................ 244 Carlsbad Boulevard Bridge Retrofit Over San Diego Northern Railroad ............................................................................... 245 Carlsbad Boulevard Widening - Cannon Road to Manzano Drive ........................................................................................ 246 Carlsbad Village Drive Widening .......................................................................................................................................... 247 Chestnut Avenue Wall .......................................................................................................................................................... 248 College BoulevardKannon Road Reach 3 ........................................................................................................................... 249 ............................................................................................................... .......................................................................................... viii Street Proiects (Continued) El Camino Real and Camino Vida Roble ............................................................................................................................. 250 El Camino Real and Faraday Avenue .................................................................................................................................. 252 El Camino Real at Aviara Parkway/Alga Road ..................................................................................................................... 253 El Camino Real Improvements ............................................................................................................................................. 254 El Camino Real Medians ..................................................................................................................................................... 255 El Camino Real Widening La Costa Avenue to Arena1 Road ............................................................................................... 256 El Camino Real Widening Tamarack Avenue to Chestnut Avenue ...................................................................................... 257 Faraday Avenue/Melrose Drive Extensions ......................................................................................................................... 258 Faraday Avenue Mitigation - South of Cannon Road ........................................................................................................... 259 Interstate 5 and La Costa Avenue Auxiliary Lanes ............................................................................................................... 260 La Costa Avenue Sidewalks ................................................................................................................................................. 261 Melrose Drive and Alga Road .............................................................................................................................................. 262 Ocean Street Improvements ................................................................................................................................................. 263 Olivenhain Road Widening Mitigation Monitoring .................................................................................................................. 264 Orion Street from El Camino Real to Faraday Avenue ......................................................................................................... 265 Palomar Airport Road and College Boulevard ..................................................................................................................... 266 Palomar Airport Road Widening and Bridge Reconstruction ................................................................................................ 267 Palomar Airport Road Widening at Paseo Del Norte ............................................................................................................ 268 Pavement Management Program ........................................................................................................................................ 269 Poinsettia Lane East of El Camino Real Financing Program ................................................................................................ 270 Poinsettia Lane Railroad Bridge Widening .......................................................................................................................... 271 Poinsettia Lane Widening (Paseo Del Norte to Batiquitos Lane) .......................................................................................... 272 Olivenhain Road/Rancho Santa Fe Road Intersection .......................................................................................................... 273 Rancho Santa Fe Road North Phase I ................................................................................................................................ 274 Rancho Santa Fe Road North Phase II ............................................................................................................................... 275 SidewalWStreet Construction Program ................................................................................................................................ 276 Traffic Impact Fee Study Update .......................................................................................................................................... 277 Traffic Monitoring Program .................................................................................................................................................. 278 Underground Dlstrlct No . 17 ................................................................................................................................................. 279 El Camino Real and Carlsbad Village Drive ......................................................................................................................... 251 .. ix INTRODUCTION The purpose of this Technical Appendix is to provide a brief description of the project scope, location and need for those projects approved in the City of Carlsbad 2002-03 Capital Improvement Program (CIP) Budget. Also included at the beginning of each project category is a funding matrix which identifies the proposed funding source(s), funding amounts and timing for each of the approved CIP projects included with the respective category. All projects with any current or future funding are listed. Most of the cost estimates included in this appendix are preliminary as detailed designs have not been completed. All costs are in current dollars, therefore, projects in future years should be anticipated to escalate over time to account for inflation. CIVIC PROJECTS AMERICANS WITH DISABILITIES ACT (ADA) PROJECTS FUNDING MATRIX FOR AMERICAN'S WITH DISABILITIES ACT (ADA) PROJECTS FUTURE YEAR BUDGET MOUNTS PROJ 2012+ 2W7-2012 2006-2007 2005-2006 2004-2005 2003-2004 2002-2003 SERVICE BUDGET SOURCE PROJECTTITLE NO. BUILWUT YEAR6-10 YEARS YEAR4 YEAR 3 YEAR 2 YEAR 1 YEAROF TOTAL FUNDING 3831 1 IMR HOLIDAY PARK - RESTROOM IMPROVEMENTS NEW 22,SW 70,500 GCC ADA - CANNON PARK 741,000 GCC ADA - MISCELLANEOUS FACILITY MODIFICATIONS 2441 1 2004 162,200 162,200 141 .OW Page 1 CAPITAL PROJECT DESCRIPTION AMERICANS WITH DISABILITIES ACT (ADA) - CANNON PARK PROJECT NAME PROJECT NO. 38311 'ROJECT LOCATION MAP: WOJECT LOCATION: >annon Park - Northeast corner of Cannon Road and Carlsbad Boulevard. WOJECT DESCRIPTION: 'rovide handicap facilities to Cannon Park. Improvements include sidewalk to 311 facilities, handicap picnic area, handicap accessible drinking fountain, iandicap accessible playground equipment surfacing to equipment, and lasketball court improvements. WOJECT NEED rhis project is needed to bring all major park facilities into compliance with the 4merican with Disabilities Act. New equipment and improved facilities will ncrease the safety of this park for citizens to use. :INANCING: Purpose Estimated Cost Fundina Source Construction Design $65,500 Total Cost = $70,500 $5,000 GCC GCC CANPKADA Page 2 CAPITAL PROJECT DESCRIPTION NONE AMERICANS WITH DISABILITIES ACT (ADA) - RESTROOM REMODEL AT HOLIDAY PARK PROJECT NO. PROJECT NAME PROJECT LOCATION MAP: ~ PROJECT LOCATION: The restroom is located on the west side of Holiday Park adjacent to Pi0 Pic0 \venue. PROJECT DESCRIPTION: rhis project includes demolishing the existing 400 square foot facility and :onstructing a new 750 square foot facility for wheelchair accessibility and for Idditional stalls and accessories. WOJECT NEED: rhis project will meet the Council goal of providing Top Quality Services and will also comply with ADA standards. =INANCING: Purpose Estimated Cost Fundina Source Design $15,000 IM&R Construction $147,200 IM&R Total Cost = $162,200 >EQA Status = Exempt Holiday Page 3 CAPITAL PROJECT DESCRIPTION 3441 1 AMERICANS WITH DISABILITIES ACT (ADA) - MISCELLANEOUS FACILITY MODIFICATIONS PROJECT NO. PROJECT NAME 'ROJECT LOCATION MAP: WOJECT LOCATION: :ity Hall, Harding Community Center, Krugar House, and Elmwood House. WOJECT DESCRIPTION: Iacility modifications such as restroom alterations, new drinking fountains, ?ntry ramps, handrail modifications, new signage and parking lot changes. A xeliminafy survey of City facilities in 1992 indicated the estimated cost ipproached $600,000. Due to the complexity of the law and the significant ;cope of work involved at all facilities, costs could be much higher. Therefore, his project is recommended to be phased in over several years. WOJECT NEED: The Americans with Disabilities Act requires numerous facility modifications and upgrades to make them accessible to disabled persons. Purpose Estimated Cost Fundinq Source Construction $741,000 GCC Total Cost = $741 ,ow ADAMODIF Page 4 ADMINISTRATIVE FACILITY PROJECTS FUNDING MATRIX FOR ADMINISTRATIVE FACILITIES PROJECTS PROJECT TITLE Page 5 CAPITAL PROJECT DESCRIPTION ADMINISTRATIVE FACILITIES - CITY HALL PROJECT NAME PROJECT NO. NONE PROJECT LOCATION MAP: WOJECT LOCATION: II Camino Real and Faraday Avenue. WOJECT DESCRIPTION: 'urchase of the 128,000 square foot "Farmers Building" at the intersection o il Camino Real and Faraday Avenue. The building will be the future site for i :ity Hall and Council Chambers complex. Project will consolidate al Idministrative operations and facilities in one location for organizational anc Iperational efficiency. Include 1% for public art. 'ROJECT NEED: qequired to meet Growth Management Standards, :INANCING: Purpose DesignIConstruction Total Cost = Estimated Cost Fundlnq Source $20,270,000 CFD #1 $20,270,000 CITYHALL Page 6 CAPITAL PROJECT DESCRIPTION 35721.35722. ADMINISTRATIVE FACILITIES - PUBLIC WORKS CENTER PROJECT NAME 36551 PROJECT NO. I PROJECT LOCATION MAP: 'ROJECT LOCATION: 'hase I1 of Safety & Service Center, Orion Way. 'ROJECT DESCRIPTION: :onstruction of Phase II of the Public Safety and Service Center consists Irimarily of the Public Works Center and associated improvements, ihe project includes oftice, shops, yard, warehouse, and parking tc iccommodate the Public Works MSA. The warehouse will also provide or citywide warehousing and storage. Additionally, the project increases Safet) >enter parking and includes funding for public art. Project also include: elocation of the existing ballfield to the corner of Faraday Avenue and Caminc iills Drive. 'ROJECT NEED: 3equired to meet Growth Management Standards. VNANCING: PurDose Estimated Cost Funding Source Design/Construction $10,493,000 CFD #1 Design/Construction $4,600,000 Design/Construction $2,200,000 Water Replacement Sewer Replacement Total Cost E $17,293,000 Wnual Operating Cost = $159,080 Page 7 POLICE AND FIRE FACILITY PROJECTS FUNDING MATRIX FOR POLICE AND FIRE FACILITY PROJECTS Page a CAPITAL PROJECT DESCRIPTION POLICE AND FIRE FACILITIES - POL 'ROJECT LOCATION MAP: NOT APPLICABLE 9ND FIRE CAD IMPLEMENTATION PROJECT NO. 36851 'ROJECT LOCATION: jafety Center. 'ROJECT DESCRIPTION: CAD) system and implement an 800 MHz radio data communication system. -his project will replace an existing 13 year old Computer Aided Dispatch -he replacement of the CAD system is necessary due to the age and utmoded technology of the existing system and the inability to implemenl najor portions of the data communications system due to the outmoded echnology of the existing system. 'ROJECT NEED lepartments to provide a timely response to emergency incidents. This -he primary purpose of the CAD system is to enable the police and fire :upports Council Goal Strategic Goal of Top Quality Services by being able ta brovide timely responses that result in high customer satisfaction anc mprove work processes through the use of best technology and ntormation. -he technology of the existing CAD system prevents the police and fire lepartments from implementing components of the 800 MHz Data :ommunication system such as Automatic Vehicle Locator (AVL), integration vith City mapping system, records retrieval and field reporting. :INANCING: PurDose Estimated Cost Fundina Source Installation 52,221,000 GCC Total Cost = $2,221 ,ow CAData Page 9 CAPITAL PROJECT DESCRIPTION 36951 POLICE AND FIRE FACILITIES - POLICE AND FIRE TRAINING FACILITY PROJECT NO. SITE SELECTION AND FEASIBILITY STUDY PROJECT NAME 1 PROJECT LOCATION MAP: FS3reloc ~~~ ~~~ ~ 'ROJECT LOCATION: In the north side of Tamarack Avenue east of Pontiac Drive at the site of the !xisting Calavera Sewer Treatment Plant. 'ROJECT DESCRIPTION: 'reparation of a site selection and feasibility study report for the construction 01 I combined police and fire training facility to include facilities for training on fir€ uppression, exterior and interior fire operations, technical rescues, emergenc) nedical and hazardous material operations. Additionally, the facility ma) nclude facilities for training on vehicle operations, K-9 training, and searcl varrantltactical team training. Additional support facilities would include )arking, conference/classrooms, restrooms, and kitchenleating area. WOJECT NEED Top quality services are provided when the workforce is highly trained anc ;killed in their job requirements. The Police and Fire Departments have nc idequate area or facility to conduct a number of training evolutions. Currently raining activities take place on private property or they don't take place at all. 'INANCING: Purpose Estimated Cost Fundina Source Feasibility Study $45,000 GCG Total Cost = $45,000 Page 10 CAPITAL PROJECT DESCRIPTION POLICE AND FIRE FACILITIES - FIRE STATION NO. 3 (RELOCATION) PROJECT NAME I PROJECT LOCATION MAP: FIRESTA3.doc NONE PROJECT NO. 'ROJECT LOCATION: Southwest comer of Carlsbad Village Drive and Glasgow Street adjacent to :alavera Park. 'ROJECT DESCRIPTION: -his new station will be a 3,500 quare foot suburban facility housing one I-person engine company. It will be the same design as Stations 4 and 6. Wter relocation, the existing Fire Station No. 3 building and site will be sold. ncludes 1% cost for public art in compliance with Ordinance No. 1279. 'ROJECT NEED: ielocation of this fire station is required to ensure a five minute response time vithin the northeast quadrant of the City as development occurs. :INANCING: Purpose Estimated Cost Fundina Source Design/Construction $895,000 PFF Total Cost = $895,000 Page 11 CAPITAL PROJECT DESCRIPTION 36881 POLICE AND FIRE FACILITIES - FIRE STATION NO. 5 STORAGE BUlLDlNGlRESTROOMS PROJECT NO. PROJECT NAME 'ROJECT LOCATION MAP: / / 'ROJECT LOCATION: 1540 Orion Way adjacent to the Public Safety Center and Fire Station No. 5. 'ROJECT DESCRIPTION: :onstruct a 2,469 square foot combined public restroomslsecure storage acility adjacent to Fire Station No. 5. The structure will be designed and built tc rovide for fire equipment storage and roof ventilation training. The structure vill be designed to accommodate a future second floor. The overall design will icorporate the same building materials as the existing building. The public estrooms will serve citizens utilizing the new Skateboard Park. 'ROJECT NEED hrrent storage has been outgrown and portable, plastic enclosures are being lsed to alleviate problem. Project will provide additional enclosed, secure Itorage space at Fire Station No. 5. Facility will also include restrooms, vending nachines, drinking fountain and pay phone for citizens using Skateboard Park. VNANCING: Purpose Estimated Cost Fundina Source Construction $216,600 GCC Total Cost = $216,600 FS5stor Page 12 CAPITAL PROJECT DESCRIPTION POLICE AND FIRE FACILITIES - FIRE STATION NO. 6 (PERMANENT) PROJECT NAME I PROJECT LOCATION MAP: FIRESTAG NONE PROJECT NO. ~~ ~ ~~ ~~ ~ ~ ~ WOJECT LOCATION: 3n the east side of the relocated Rancho Santa Fe Road. Precise location ta )e determined. ?ROJECT DESCRIPTION: rhis new station will be a 3,500 square foot suburban facility housing one 3-person engine company. It will be the same design as Stations 3 and 4. 4fter construction, the existing temporary Station No. 6 will be dismantled anc ,he land restored for use by the developer. WOJECT NEED: The fire station is required to ensure a five minute response time within the joutheast corner of the City as development occurs. ncludes 1% cost for public art in compliance with Ordinance No. 1279. 9NANCING: PurDose Estimated Cost Fundins Source DesignIConstruction $1,025,000 PFF Total Cost = $1,025,000 Page 13 CAPITAL PROJECT DESCRIPTION 36861 POLICE AND FIRE FACILITIES - POLICE TRAINING RANGE - RELOCATION PROJECT NO. PROJECT NAME 'ROJECT LOCATION MAP: NONE ~ ~~ ~ ~ ~~~ ~~~ ~~~ ?ROJECT LOCATION: Zity of Carlsbad (CMWD) owned property southerly of Lake Calavera. WOJECT DESCRIPTION: hnstruct an outdoor Carlsbad Police Training Range including access road($ and utilities, parking lot, storage and restroom facility, sound attenuation jtructure, earthen berms, and landscaping. WOJECT NEED: Uecessitated by pending City Golf Course Project construction. Existing Police rraining Range facility within Macario CanyonNeteran's Memorial Park is to be emoved. 'INANCING: Pumose Estimated Cost Funding Source Design $50,000 GCC Construction $900,000 GCC Total Cost = $950,000 Policerg Page 14 LIBRARY FACILITY PROJECTS FUNDING MATRIX FOR LIBRARY FACILITY PROJECTS PROJ NO. FUTURE YEAR BUDGETMOUNTS FUNDING 2012+ 2007-2012 2006-2007 2005-2006 2W-2005 2003-2004 2002-2003 SERVICE BUDGET SOURCE BUILDOUT YM6-10 YEAR5 YEAR4 YEAR3 YEAR 2 YEAR1 YEAROF TOTAL PROJECT TITLE COLE LIBRARY EXPANSION (35%) COLE LIBRARY EXPANSION (65%) - CFWl 4.608,WO PFF 4,608,wo 8,320.ooO 8.320,WO Page 15 CAPITAL PROJECT DESCRIPTION LIBRARY FACILITIES - COLE LIBRARY EXPANSION PROJECT NAME PROJECT NO. NONE PROJECT LOCATION MAP: 'ROJECT LOCATION: rt the site of the existing Cole Library, 1250 Carlsbad Village Drive, adjacent to le existing City Hall. 'ROJECT DESCRIPTION: :onstruction of a new 45,155 square foot library on the present site, east of the !xisting library building. 'ROJECT NEED: 'he Library Master Plan calls for expansion of the Cole Library to meet the lrowth management standard at buildout. The 1998 Feasibility Study ecommends replacement of the existing library with a 45,155 square foot new Iuilding. This construction will satisfy the buildout growth management itandard of 100,000+ square feet of library space. Project includes 1% for Iublic art. :INANCING: PurDose Estimated Cost Fundina Source DesignlConstruction $8,320,000 PFF DesignlConstruction $4,606,000 CFD #I Total Cost = $12,928,000 D(P-COLE.doc Page 16 MISCELLANEOUS PROJECTS FUNDING MATRIX FOR MISCELLANEOUS PROJECTS Page 17 CAPITAL PROJECT DESCRIPTION MISCELLANEOUS PROJECTS - COASTAL RAIL TRAIL PROJECT NAME I PROJECT LOCATION MAP: Rl-trail 34552 & 34553 PROJECT NO. 'ROJECT LOCATION: Vithin the San Diego Northern Railroad (SDNRR) right-of-way between the Iceanside Transit Station and the Encinitas Coaster Station. 'ROJECT DESCRIPTION: :onstruction of a 16-foot wide paved multi-modal bicycle/pedestrian trai icluding graded shoulders, landscaping, signage, safety devices at roadwa) irossings, bicycle loop detectors and other ancillary facilities. The project alsc icludes demolition of the existing eastern trestle bridge over the Aguz iedionda Lagoon (which supports the Vista Carlsbad sewer trunkline) and its eplacement with a new shared trunklinelpedestrian bridge. 'ROJECT NEED: ransportation facilities. The linking of four North County Coaster transi 'he project accomplishes the Council goal of promoting multi-moda tations with a pedestrianhicycle trail will encourage the use of non-motorizec ransport through the City, as well as to and from the transit stations. PurDose Estimated Cost Fundins Source Project Study Report $192,000 Project Study Report TSM 5768,000 DesignlStudy CMAQ 5120,000 * DesignlStudy 5184,000 * TDA APCD DesignlConstruction Construction 55,824,000 54,513,500 * CMAQ Construction 5600,000 * TEA Construction $1,341,500 * TrmsBike Total Cost = $13,543,000 TEA-21 Funds programmed in Regional Transportation Improvement Program (RTIP), :IP appropriates design funds only at this time. ~ ~~ Page 18 CAPITAL PROJECT DESCRIPTION NONE MISCELLANEOUS PROJECTS - DOWNTOWN RAIL CORRIDOR ENHANCEMENT PROJECT NO. PROJECT NAME PROJECT LOCATION MAP: PROJECT LOCATION: within the railroad right-of-way on the west side of the tracks between Located in the coastal zone within City jurisdiction. The project is located Tamarack Avenue and Carlsbad Village Drive. PROJECT DESCRIPTION: Enhancement of the west side of the railroad right-of-way between Carlsbad Village Drive and Tamarack Avenue. The right-of-way is 200 feel wide, 100 feet on both sides of the existing tracks. Enhancements would treatment, picnic tables, drinking fountains, exercise equipment, tables include such amenities as a trail parallel to the tracks, special landscape and other appropriate features that will provide an attractive staging area fol groups and commuters. The project also proposes a formal pedestrian crossing at Chestnut Avenue. PROJECT NEED: The project enhances the downtown rail corridor providing landscapins and alternative uses for the rail corridor and would be a compliment to the area of the railroad right-of-way that traverses through the Carlsbad Village Coastal Rail Trail Project (Project No. 3455). This project would enhance ar Area and could be used by citizens and visitors to the downtown area. The project provides an opportunity to enhance a blighted area of town anc provide for a linear park amenity. FINANCING Pumose Estimated Cost Fundinq Source Property Acquisition $27,500 Design $82,500 Total cost = $1 10,500 CEQA Status = Future CEQA Required. Annual Operating Cost = $5,000 GCC GCC Railcorr Page 19 CAPITAL PROJECT DESCRIPTION NONE MISCELLANEOUS PROJECTS - COMMUNITY FACILITIES DISTRICT #I ADMINISTRATION PROJECT NO. PROJECT NAME PROJECT LOCATION MAP: NIA CFD#IADM 'ROJECT LOCATION: 4lA 'ROJECT DESCRIPTION: :ity costs to administer Communities Facilities District No. 1 (CFD #i). 'ROJECT NEED: Mministration of Communities Facilities District No. 1 is needed to assure thal he CFD #i taxes are properly levied and collected in conformance with State aw and to be certain that funding for the CFD #1 projects is available at the ime of need for the various projects. FINANCING: PurDose Estimated Cost Funding Source Administration $i.430,000 CFD #1 Total Cost = $1,430,000 Page 20 CAPITAL PROJECT DESCRIPTION 36341 PROJECT NO. PUBLIC WORKS INVENTORY AND , MISCELLANEOUS PROJECTS - FACILITIES MANA' DRn I ~~ 'ROJECT LOCATION MAP: NOTAPPLICABLE ENT PROGRAM 'ROJECT LOCATION: NIA 'ROJECT DESCRIPTION: -his project will create a comprehensive computer based geographical information ,ystem (GB) for all capital improvements maintained within the Public Works Aajor Service Area. In addition to establishing a COmpUter inventory Of all Public Vorks facilities, the program will establish service standards, track maintenance tistories, identify hazard areas, project future replacement and maintenance needs md project future staffing levels needed to maintain the existing and projected 'ublic Works inventory. 'ROJECT NEED: rhis project is needed to modernize the Public Works function5 Of the City. 'resently, the inventory control and maintenance programming functions of the >ublic Works Service Area are disjointed, minimal or non-existent. This results in owered maintenance and staffing efficiency. Completion Of the program Will result n better utilization of staff resources, improved maintenance of Public Works jecreased facility life cycle ccsts. acilities, improved budgeting for maintenance services and capital projects and "NANCING: Purpose Estimated Cost Fundinq Source Data AcquisitionlPrograms $390,000 GCC Total Cost = $390,000 PWINVENT.doc Page 21 CAPITAL PROJECT DESCRIPTION I PROJECT LOCATION MAP: I Senctrydren PROJECT LOCATION: Carlsbad Senior Center, 799 Pine Avenue. PROJECT DESCRIPTION: Re-landscape and upgrade the courtyard at the Carlsbad Senior Cente including planting, irrigation new planters, hardscape improvements an1 possibly a water feature. PROJECT NEED: past 12 years. A new plan incorporating new plantings and development o Landscaping in the Senior Center Courtyard has become overgrown during thc more user-friendly space is needed to make this feature of the facility mort usable by the many customers. FINANCING: PurDose Estimated Cost Fundina Source Design Construction Total Cost = $30,000 $5,000 $25,000 GCC GCC 2EQA Status: Statutorily or categorically exempt. Page 22 REDEVELOPMENT PROJECTS FUNDING MATRIX FOR REDEVELOPMENT PROJECTS Page 23 CAPITAL PROJECT DESCRIPTION REDEVELOPMENT - DOWNTOWN STREET LIGHTING ENHANCEMENT STUDY PROJECT NAME PROJECT LOCATION MAP: STRLIGHT 35081 PROJECT NO. PROJECT LOCATION: Bounded by the northerly city limits, Pacific Ocean, 1-5 and Agua Hedionda PROJECT DESCRIPTION: 'ROJECT NEED: ncrease customer service and safety. :INANCING: Purpose Estimated Cost StudyFieport $65,000 $65,000 Total Cost = Fundina Source Redevelopment Bonds Page 24 CAPITAL PROJECT DESCRIPTION REDEVELOPMENT - VILLAGE AREA STREET FURNITURE AND PLANTERS PROJECT NO. 36511 PROJECT NAME PROJECT LOCATION MAP: PROJECT LOCATION: Within boundaries of Village Redevelopment Area. PROJECT DESCRIPTION: To provide for additional street furniture and landscape planters within Village Redevelopment Area. The additional furniture may include replacement of jamaged benches, landscape planters and/or trash cans as well as the addition of new benches, landscape planters and/or trash cans. PROJECT NEED: The ambiance of the Village Redevelopment Area is enhanced through sttractive street furniture, which includes benches, landscaped planters, and :rash cans. In some cases, existing street furniture or landscaped planters lave been damaged and are in need of replacement. In other cases, there nay be additional need for street furniture or landscaped planters to continue snhancement of the Village Area. The proposed projecffprogram is designed :o continue enhancement of the Village Redevelopment Area. Purpose Estimated Cost Fundina Source Furniture $95,000 Redevelopment Bonds Total Cost = $95,000 PLANTERS Page 25 CAPITAL PROJECT DESCRIPTION 36501 REDEVELOPMENT - VILLAGE PUBLIC PARKING ENHANCEMENT PROGRAM PROJECT NO. PROJECT NAME I PROJECT LOCATION MAP: VILLGPKG 'ROJECT LOCATION: Vithin boundaries of Village Redevelopment Area. 'ROJECT DESCRIPTION: nplementation of recommendations within Village Parking Program, which tclude acquisition of land for future public parking, a study of impediments to 111 utilization of existing public parking lots, and improvements to existing ublic parking lots (as needed) to encourage full utilization of existing public arking lots. 'ROJECT NEED: 'arking in the Village Redevelopment Area has been an issue for severa ears. A Village Parking Program is currently being prepared to address $commended actions to pursue to address the underutilization of existing arious parking issues within the Village. This program will identif) Nublic parking lots and to plan for future parking needs. The proposed projects Ire consistent with the needs to address parking in the Village. :INANCING: Purpose Estimated Cost Fundina Source Land Acquisition $759,215 Redevelopment Bonds Total Cost = $759,215 Page 26 CAPITAL PROJECT DESCRIPTION REDEVELOPMENT -VILLAGE PUBLIC RELATIONS CAMPAIGN PROJECT NAME 36531 PROJECT NO. 'ROJECT LOCATION MAP 'ROJECT LOCATION: Yithin boundaries of Village Redevelopment Area. 'ROJECT DESCRIPTION: mplementation of recommendation within Village Parking Program, which lrovides for a marketing study and public relations plan to encourage :ustomers, business owners, and employees to park in existing public parking )ts and to walk to their various destinations within the Village Redevelopment wea. 'ROJECT NEED: 'arking in the Village Redevelopment Area has been an issue for several ears. A Village Parking Program is currently being prepared to address 'arious parking issues within the Village. This program will provide for a study Ind marketing plan to enhance the pedestrian-orientation desired for the lillage Redevelopment Area. :INANCING: PurDose Estimated Cost Fundina Source Public Relations $50,000 Redevelopment Bonds Total Cost = $50,000 CAMPAIGN Page 27 FACILITY MAINTENANCE PROJECTS FUNDING MATRIX FOR FACILITIES MAINTENANCE PROJECTS ~ FUTURE YEAR BUDGET AMOUNTS PRW NO. PROJECTTITLE FUNDING TOTAL YEAROF YEAR 1 YEAR 2 SOURCE BUDGET SERVICE 2002-2003 2003-2004 2ooC2005 2005-2006 2006.2007 2007.2012 a12+ YEAR 3 YEAR4 YEAR5 YEAR6-10 BUILDOUT 35101 IASBESTOS SURVFV I I I I I I Page 28 CAPITAL PROJECT DESCRIPTION FACILITIES MAINTENANCE -ASBESTOS SURVEY PROJECT NAME PROJECT NO. 35101 'ROJECT LOCATION MAP: CITYWIDE ~ ~ 'ROJECT LOCATION: All City facilities. 'ROJECT DESCRIPTION: survey all City facilities to identify presence of asbestos and recommend appropriate abatement method. 'ROJECT NEED: XHA requirement. =INANCING: PurDose Estimated Cost Funding Source Survey Report $40,000 GCC Total Cost = $40,000 4SBESTOS.doc Page 29 CAPITAL PROJECT DESCRIPTION 38321 FACILITIES MAINTENANCE - CALAVERA HILLS CENTER OFFICE EXPANSION PROJECT NO. PROJECT NAME PROJECT LOCATION MAP: Cal-expn 'ROJECT LOCATION: !997 Glasgow Drive at Calavera Hills Community Center (Reception Office) 'ROJECT DESCRIPTION: inlarge Reception Office to accommodate second computer station to process ecreation program registrations and provide desk space for Office Assistant. bmodel includes moving current reception counter out 4-112 feet into lobby ma, remodeling front counter workspace that is ergonomic and provide vorkspace for Office Assistant to process registration and handle phones. 'ROJECT NEED: -his project will assist staff in providing efficient and effective service to OUI :itizens. Current office does not provide adequate space to handle the 10,OOC egistrations and facility use applications we receive annually. The anticipatec )opulation growth of more than 3,000 in the Calavera Hills area in 200C ncreases the need for adequate workspace. :INANCING: PurDose Estimated Cost Funding Source Design $600 GCC Construction $24,400 GCC Total Cost = $25,000 Page 30 CAPITAL PROJECT DESCRIPTION PROJECT NO. 38331 PROJECT LOCATION MAP: PROJECT LOCATION: Harding Community Center Auditorium and Recreation Hall 3096 Harding Street PROJECT DESCRIPTION: The Harding Center Auditorium and Recreation Hall gets very warm during the summer months (June-September). The auditorium and recreation hall are twc of the largest facilities available to the public to rent for many types of occasions. PROJECT NEED: This project was brought to the attention of the Harding Community Center stail by several facility users of the auditorium and recreation hall. The installation of ceiling fans to circulate the air would assist in the overall :ooling of the interior of these buildings. The upgrade will also make the 'acilities more attractive. 'INANCING: PurDose Estimated Cost Fundlna Source Construction $10,000 GCC E1 0,000 Total Cost = lnnual Operating Cost = $250 Page 31 CAPITAL PROJECT DESCRIPTION FACILITIES MAINTENANCE - HARDING CENTER - KITCHEN REMODEL PROJECT NAME PROJECT LOCATION MAP: PROJECT NO. 38341 'ROJECT LOCATION: -larding Community Center Recreation Hall, 3096 Harding Street. 'ROJECT DESCRIPTION: ?emode1 the recreation hall kitchen which would include all appliances, counter ops and cabinets. This project will benefit the community user groups, facility lser groups, and department classes. The revenue generated from facility entals will cover all costs within a fiscal year. 'ROJECT NEED: The kitchen is in its current condition when the City took over the facility !5 years ago. The oven and burners do not work properly. The counter tiles are :hipped. The project is needed to maintain safe conditions for rental groups and department classes, as well as to the community center a much needed ace lift. The upgrade would save the City money and in return generate evenue in facility rentals. :INANCING: Purpose Estimated Cost Funding Source Construction $20,000 GCC Total Cost = $20,000 Hdg-kchn Page 32 CAPITAL PROJECT DESCRIPTION ~ 35161 FACILITIES MAINTENANCE - MISCELLANEOUS CITY FACILITY MAINTENANCE PROJECTS No. PROJECT NAME PROJECT LOCATION MAP: VARIOUS CITY FACILITIES MlSCMAlN 'ROJECT LOCATION: larious City facilities. 'ROJECT DESCRIPTION: innualized funding for miscellaneous facility maintenance projects to be :arried out on various City facilities. Maintenance activities covered under this mject description include, but are not limited to: exterior and interior painting, ermite mitigation, exterior door replacements, carpet and floor renovations, md roof rehabilitation. WOJECT NEED: rhese are minor maintenance projects that are necessary to preserve anc Irotect various facilities. :INANCING: Purpose Estimated Cost Fundina Source Maintenance $506,561 GCC Total Cost = $506,561 Page 33 'ROJECT LOCATION MAP CAPITAL PROJECT DESCRIPTION 36381 FACILITIES MAINTENANCE - SAFETY CENTER BUILDING IMPROVEMENTS PROJECT NO. PROJECT NAME \\ PROJECT LOCATION: The Public Safety Center at 2560 Orion Way. PROJECT DESCRIPTION: Upgrade and renovate several areas of the Safety Center including thc Community Services Area, Report Writing Area, Patrol Civilian Cornmunit) Services Officer Area, Sally Port Area, and Crime Lab/Cal ID Area ant Zonference Facility. Also included is the replacement of numerous broker :hairs. PROJECT NEED: The Safety Center has now been in service for 12 years. There are severa areas where upgrades or improvements are needed to eliminate unsightl) :onditions and improve occupant safety. Also proposed are some minol modifications to improve functionality, service quality and customer satisfaction PurDose Estimated Cost Fundina Source Construction $50,000 GCC Total Cost = $50,000 SCTRMISC Page 34 CAPITAL PROJECT DESCRIPTION 35761 FACILITIES MAINTENANCE - SAFETY CENTER CONFERENCE CENTER REFURBISHMENT PROJECT NO. PROJECT NAME PROJECT LOCATION MAP: SFTYCNTR PROJECT LOCATION: The Public Safety Center at 2560 Orion Way. PROJECT DESCRIPTION: Hire a consultant to review the existing conferencehraining facilities at thc Public Safety Center and to prepare a report recommending various ways t( improvements, lighting system enhancements, environmental controls, visua improve the facilities. Specific recommendations should include audiohisua appearance and furniture needs. PROJECT NEED: The existing facility is nearly 12 years old and in need of an upgrade The current sound system is inadequate for existing uses. Users of the facilio complain of the lack of individual environmental controls and poor lighting Improvements are needed to bring the audio/visual capabilities up to curreni technological standards. FINANCING: PurDose Estimated Cost Fundina Source Refurbishment $200,000 GCC Total Cost = $200,000 Page 35 CAPITAL PROJECT DESCRIPTION FACILITIES MAINTENANCE - SENIOR CENTER - RECOAT ROOF PROJECT NAME PROJECT NO. 36422 I PROJECT LOCATION MAP: SNCTROOF PROJECT LOCATION: 799 Pine Avenue. PROJECT DESCRIPTION: +coat roof membrane with reflective coating. WOJECT NEED: 3oof is nine years old and basically sound except for reflective coating that hac kteriorated and is peeling. Recoating is necessary to preserve integrity o ,oaf. :INANCING: PurDore Estimated Cost Fundina Source Construction $240,000 IM&R $240,000 Total Cost = Page 36 CAPITAL PROJECT DESCRIPTION FACILITIES MAINTENANCE - SENIOR CENTER FLOOR REPLACEMENT PROJECT NAME PROJECT LOCATION MAP: I VINYLFLR PROJECT NO. 35151 'ROJECT LOCATION: Senior Center at 799 Pine Avenue 'ROJECT DESCRIPTION: qeplace vinyl floor in auditorium and waterproof concrete expansion joints. 'ROJECT NEED: doisture is penetrating through concrete expansion joints, causing floor to spa1 md delaminate. 'INANCING: Purpose Estimated Cost Fundina Source Maintenance $65,000 GCC Total Cost = $65,OOo Page 37 CAPITAL PROJECT DESCRIPTION FACILITIES MAINTENANCE - WATER DISTRICT - REPAIWREPLACE CONCRETE ENTRANCE PROJECT 36651 NO. PROJECT NAME PROJECT LOCATION MAP: I WDENTRNC PROJECT LOCATION: 5950 El Camino Real. PROJECT DESCRIPTION: Repairhplace concrete Steps, sidewalk and entrance slab. PROJECT NEED: soil is Settling, causing concrete to shift and pull apart. FINANCING: PurDose Estimated Cost Fundina Source Construction $20,000 Water Replacement $20,000 Total Cost = Page 38 PARKS PROJECTS CITYWIDE PARKS PROJECTS FUNDING MATRIX FOR CITYWIDE PARKS PROJECTS PRW ~ FUNDING BUILOOUT YEAR 6-10 YEAFIR5 YEAR4 2012+ 2007-2012 200€-2007 2005-2006 2004-2005 2003-2004 2002-2003 SERVICE BUDGET SOURCE YEAR 3 YEAR 2 YWl YEAROF TOTAL FUTURE VEAR BUDGET AMOUNTS NO. PROJECT TITLE 35781 5,810,405 GOLFCOURSE 2,644,030 CARLSBAD MUNICIPAL GOLF COURSE 30721 2,626,000 5,000 ZONE 5 BUSINESS PARK RECREATIONAL FAClLiTY VETERANS MEMORIAL PARK 8.065,wo 8,064.oOo 16,129,000 CFDXl Page 39 CAPITAL PROJECT DESCRIPTION 35781 CITYWIDE PARKS PROJECTS - BUSINESS PARK RECREATIONAL FACILITY PROJECT NO. PROJECT NAME PROJECT LOCATION MAP: PROJECT LOCATION: In Zone 5, at the corner of Faraday and Camino Hills, PROJECT DESCRIPTION: In FY 98-99, the City acquired 13 acres to develop into the Business Park Recreation Facility. Proposed amenities may include a fitness center, swimming pool, ball fields, soccer fields, basketball, handball, volle@all courts, picnic areas, jogging trails, etc. It is anticipated that staff will meet with the business park community to gather input into the most needed amenities. The City may explore privatization options for a portion of the development (e.g., the fitness center) which may accelerate development Project includes 1% for public art. PROJECT NEED: Demand and need for recreational facilities within the industrial area identified through a Parks and Recreation Commission subcommittee who conducted two independent surveys and received input from Zone 5, 13, and 16 developers. Purpose Estimated Cost Fundina Source Design/Construction $2,644,000 Zone 5 Fee Total Cost = $2,644,000 Estimated Annual Operating Cost = $200,000 BUS-PARK Page 40 CAPITAL PROJECT DESCRIPTION CITYWIDE PARKS PROJECTS - CARLSBAD MUNICIPAL GOLF COURSE PROJECT NAME ~~ PROJECT LOCATION MAP: PROJECT LOCATION: Palomar Airport Road and College Boulevard. PROJECT DESCRIPTION: I Design an 18-hole championship golf course. Work will include grading, landscaping a clubhouse, access roads and utilities. The Golf Course Steering Committee may consider additional features to be included. I PROJECT NEED: I Because of strong citizen interest, the Parks and Recreation Commission recommended building a golf course. Part of the Parks and Recreation Element of the General Plan. FINANCING: PurDose Estimated Cost Funding Source Design $5,810,405 Golf Course Enterprise Fund Total Cost = $5,810,405 Page 41 GOLFDEV CAPITAL PROJECT DESCRIPTION CITYWIDE PARKS PROJECTS - VETERAN'S MEMORIAL PARK PROJECT NAME PROJECT NO. NONE 'ROJECT LOCATION MAP: PROJECT LOCATION: This property is located south and east of Agua Hedionda Lagoon, near the geographic center of Carlsbad. PROJECT DESCRIPTION: The Master Plan for development of Veteran's Memorial Park includes the following improvements: streets, utilities, communily leisure needs, open space interpretive area, parking and maintenance facility. Other suggested uses for this park area include amphitheater complex, sports complex, conference center and numerous other active/passive recreational amenities. Project funding includes 1% for public art. PROJECT NEED: The Macario Canyon property has been under City lease or ownership for a would provide the needed parkland for all quadrants at buildout. Part of the number of years. The development of this property, since it is centrally located, Parks and Recreation Element of the General Plan. FINANCING: PurDose Estimated Cost Funding Source DesignlConstruction $16,129,000 CFD #I Total Cost = $16,129,000 Annual Operating Cost = $660,000 IETERAN.doc Page 42 NORTHWEST QUADRANT PARKS PROJECTS FUNDING MATRIX FOR NORTHWEST QUADRANT PARKS PROJECTS Page 43 CAPITAL PROJECT DESCRIPTION NORTHWEST QUADRANT PARKS - CANNON LAKE PARK PROJECT NAME PROJECT NO. NONE I PROJECT LOCATION MAP: CANLAKE.doc PROJECT LOCATION: of the AT&SF Railway tracks. In the Northwest Quadrant at Cannon Lake: South of Cannon Road and wes PROJECT DESCRIPTION: Develop a 6.7 acre site. Development may include restrooms, parking an( passive areas for picnicking and leisure recreation activities. Also includes 1% for public art. PROJECT NEED: Required to meet Growth Management Standards and identified in the Park! and Recreation Element of the General Plan. FINANCING: Pumose Estimated Cost Fundinq Source DesignIConstruction $947,000 PFF Total Cost = $947,000 4nnual Operating Cost = $80,400 Page 44 CAPITAL PROJECT DESCRIPTION NORTHWEST QUADRANT PARKS - CHASE FIELD BATHROOMSlSNACKBAR BUILDING REPLACEMENT PROJECT 36351 NO. PROJECT NAME PROJECT LOCATION MAP: AVE I CHESTNU I CHSEFLD2 PROJECT LOCATION: Chase Field - 3433 Harding Street. PROJECT DESCRIPTION: Demolish and Size to be 900 square feet. reconstruct bathroomknackbarktorage facility at Chase Fielc PROJECT NEED: This heavily used facility is in need of replacement. The original structure wa: :onstructed by volunteers 25+ years ago. Although some modifications werl :omPleted in 1985, the building is not meeting current needs. A new1 jesigned, slightly larger building would provide the citizens of Carlsbad quality facility with less maintenance. FINANCING: PurDose Estimated Cost Fundina Source Construction Planning/Study $159,000 $31,000 GCC GCC Total Cost = $190,000 Page 45 CAPITAL PROJECT DESCRIPTION PROJECT LOCATION MAP: PROJECT NO. 38631 PROJECT LOCATION: Chestnut Avenue and Pi0 Pic0 Drive PROJECT DESCRIPTION: Replace existing playground equipment with equipment that meets all ADA and iew safety standards. This project will also include installing cushioned ubberized surfacing to provide ADA access to the playground equipment and swing sets. WOJECT NEED: rhis project meets Council Goal A - Ensure the effective and efficient delivey If top-quality services to our community. This project also meets Operational ;oal A4 - Construct, maintain and operate facilities that support topquality iewice deliwety in conformance with Cify budgets and standards. In addition, his project will help meet legal requirements (Le., ADA, State legislation). Puroose Estimated Cost Fundins Source Construction $85,000 IM&R Total Cost = $85,000 :EQA Status: Statutorily or categorically exempt. Plgmdeq Page 46 CAPITAL PROJECT DESCRIPTION NORTHWEST QUADRANT PARKS - HOSP GROVUBUENA VISTA LAGOON RECREATIONAL IMPROVEMENTS PROJECT NAME WOJECT LOCATION MAP NONE PROJECT NO. 'ROJECT LOCATION: n the northwest quadrant from Hosp Grove along the south shore of the 3uena Vista Lagoon to the Pacific Ocean. Includes Maxton Brown Park, daxton Brown extension, and Maxton Brown expansion area. 'ROJECT DESCRIPTION: )evelop a variety of recreational opportunities including passive parks, mardwalks. view areas, trails, parking and staging areas in Hosp Grove, the 3uena Vista Lagoon, and out to the Pacific Ocean. Also includes 1% for public rrt. WOJECT NEED: 3equired to meet Growth Management standards and is part of the Northwest luadrant Park Enhancement Program. :INANCING: PurDose Estimated Cost Fundinn Source Design/Construction $2,980,000 PIL-NW Total Cost = $2,960,000 HOSPGRVZ Page 47 CAPITAL PROJECT DESCRIPTION NORTHWEST QUADRANT PARKS - KRUGER HOUSE PRESCHOOL TOT LOT 36961 PROJECT NO. PROJECT NAME PROJECT LOCATION MAP: PROJECT LOCATION: Holiday Park, northeast corner at Kruger House PROJECT DESCRIPTION: existing Play equipment, enlarge area, provide new fencing, provide storage Enlarge children's area tot lot to bring it up to current standards. Replam structure and reconstruct asphalt surfacinghrails. PROJECT NEED: Existing area does not meet CRSC or ADA standards. This project would improve the area and bring the play area up to all federal standards. It would alSO provide a pleasant experience for the pre-school program. PurDose Estimated Cost Fundina Source Construction $35,000 GCC Total Cost = $35,000 Kruger Page 48 CAPITAL PROJECT DESCRIPTION 35191 NORTHWEST QUADRANT PARKS - MISCELLANEOUS BEACH ACCESS REPAWUPGRADES PROJECT NO. PROJECT NAME 'ROJECT LOCATION MAP: \ PACIFIC OCEAN I SITE PROJECT ~ ~ ~~~ PROJECT LOCATION: Beach accesses at Christiansen Way, Beech Street, Carlsbad Village Drive anc Grand Avenue. PROJECT DESCRIPTION: Provide major repairs to beach accesses, replace existing deteriorated beach access steps, railing, and foundations. Upgrade base (re-engineer) tc withstand high surf conditions, use heavy aluminum for handrails to replace existing eroded galvanized metal. PROJECT NEED: Major repairs are required to keep the beach accesses in a long-term safe zondition. These improvements will dramatically reduce the amount of labol and materials currently being expended on painting and maintenance of steps and handrails. FINANCING: Purwse Estimated Cost Fundins Source Design $5,000 IM&R Construction $115,000 IM&R Total Cost E $120,000 BEACHACC Page 49 CAPITAL PROJECT DESCRIPTION NONE NORTHWEST QUADRANT PARKS - PARK SITE DEVELOPMENT - PINE SCHOOL PROJECT NO. PROJECT NAME I PROJECT LOCATION MAP: PARKSIT2 'ROJECT LOCATION: 'ine School site; within the block of Harding, Pine, Chestnut and Madison. 'ROJECT DESCRIPTION: )evelop seven (7) acres of land as a park. Development may include lightec laseball fields, lighted multi-use turfed area, roofed picnic structure, parking ot, tot-lot and landscaping. Construct a 20,000 square foot communi0 :enter/gymnasium. Facility will include basketball, volleyball, gymnastics wobic exercise areas, meeting rooms, kitchen and office space. Also includes I% for public art. 'ROJECT NEED: Iequired to meet Growth Management Standards and identiiied in the Parks and Recreation Element of the General Plan. :INANCING: Purpose Estimated Cost Fundina Source PlanningEtudy $200,000 Design $500,000 Construction $6,196,000 Total Cost = $6,896,000 \nnual Operating Cost = $105,000 PFF PFF PFF ~ ~ Page 50 CAPITAL PROJECT DESCRIPTION PROJECT LOCATION MAP: ~ WOJECT LOCATION: nside equipment building of Swim Complex at 3401 Monroe street. 'ROJECT DESCRIPTION: 'erform structural changes to the Swim Complex to allow installation of 2 righ-rate or rapid sand filtration system and replacement heating system rhis will involve filling the current filter pit with gravel and capping it to allow )lacement of new filters and creating a new surge tank under the pool deck. 'ROJECT NEED: -he facility is now over twenty years old and is heavily used by the genera ublic, as well as school and community groups. There are many advantages bf replacing the existing filtration system with an alternative system. ;peed controllers which would reduce electrical usage and cost when the poo -he advantages of replacing the system include the ability to install motol 5 not in use and significantly reduced personnel hours due to lowel naintenance. :INANCING: Purpose Estimated Cost Fundinq Source Design $16,110 Construction $146,090 IM&R IM&R Total Cost = $1 62,200 :EQA Status = Exempt Swimcorn2 Page 51 NORTHEAST QUADRANT PARKS PROJECTS I' 'I FUNDING MATRIX FOR NORTHEAST QUADRANT PARKS PROJECTS FUTURE YEAR BUDGET AMOUNTS PRW NO. FUNDING 2012+ 2007-2012 2006-2007 2005-2006 2004-2005 2W3-2304 2002-2W3 SERVICE BUDGET SOURCE BUILDOUT YEAR6-10 YEAR 5 YEAR 4 YEAR 3 YEAR 2 YEAR I YEAROF TOTAL PROJECT TITLE 38561 4,500,000 PIL-NE 1,220,000 PIL-NE LARWlN COMMUNITY PARK (22.3 ACRES) 4,550,000 PFF PARK RESTORATION AND ACQUISITION 670,000 36981 3 000~000 R con con PI, "F PARK SITE DEVFI OPMFNT I1 5 ACRFS) SO1 1 PARK SITE ACQUISKION (IS ACRES) NE QUADRANT PARK 4,500,000 Page 52 CAPITAL PROJECT DESCRIPTION NORTHEAST QUADRANT PARKS - LARWIN COMMUNITY PARK PROJECT NAME PROJECT NO. 38561 I PROJECT LOCATION MAP: C LARWINPK PROJECT LOCATION: This project is located in the northeast quadrant on the north side of Carlsbal Village Drive, west of Concord Street. PROJECT DESCRIPTION: This 22.3 acre site is constrained by steep slopes, sensitive habitat and powe lines. For that reason, grading and development will be confined to a sma area. Park development may consist of limited grading and construction of twl tennis courts, a tot-lot, restrooms, a picnic area, a level turfed area, a parkin! ot and a trail system. Project funding includes 1 % for public art. PROJECT NEED: 'art of the Parks and Recreation Element of the General Plan and required tc neet Growth Management Standards. Currently there are numerou: lpartments and attached housing projects in this area with a large number o :hildren requiring recreational area. PurDose Estimated Cost Fundina Source Construction $1,220,000 PIL-NE Total Cost = $1,220,000 hnual Operating Cost c $120,000 Page 53 CAPITAL PROJECT DESCRIPTION NORTHEAST QUADRANT PARKS - PARK RESTORATION AND ACQUISITION PROJECT NAME PROJECT LOCATION MAP: PKNERSTR PROJECT NO. NONE PROJECT LOCATION: To be determined at various locations in the northeast quadrant of the City. PROJECT DESCRIPTION: Restore existing parks when and as required; acquire additional park Ian1 required by Growth Management Standards; provide additional funds in tht future if budgeted amounts fall short. PROJECT NEED: TO meet Growth Management Standards and the General Plan. =INANCING: Purpose Estimated Cost Fundina Source Restoration/Acquisition $4,500,000 PIL-NE Total Cost 3 $4,500,000 Page 54 CAPITAL PROJECT DESCRIPTION NORTHEAST QUADRANT PARK - PARK SITE ACQUISITION PROJECT NAME PROJECT LOCATION MAP: PROJECT NO. 36981 PROJECT LOCATION: In the northeast quadrant. Possibly to be within the Robertson Ranch, at thc iuture site of the flood control project just noltheast of Rancho Carlsbad Mobilc Home Park and adjacent to the future CUSD high school site. PROJECT DESCRIPTION: 4cquire ~t 15 acres for future development of ball fields. 'ROJECT NEED 3ecause of development constraints, Larwin Park was unable to fulfill the neec iortheast quadrant for ballfield development to meet the City's guidelines fol or active ball fields. Therefore, f 15 acres will be acquired somewhere in thc lumbers of ball fields per quadrant. :INANCING: PurDose Estimated Cost Fundlna Source Land Acquisition $4,550,000 PFF Total Cost = $4,550,000 NEQUAD-1 Page 55 CAPITAL PROJECT DESCRIPTION PROJECT NO. 3801 1 'ROJECT LOCATION MAP: PROJECT LOCATION: In the northeast quadrant. Possibly at the site of a proposed flood control WJjeCt, located northeast of the Rancho Carlsbad Mobile Home Park and adjacent to the future CUSD high school site. PROJECT DESCRIPTION: 3evelop * 15 acres for ball fields. WOJECT NEED: %Cause of development constraints, Larwin Park was unable to fulfill the need or active ball fields. Therefore, * 15 acres will be developed somewhere in the iortheast quadrant for ballfields to meet the City's guidelines for numbers of )all fields per quadrant. :INANCING: PurDose Estimated Cost Fundina Source Planning/Study $140,000 Environmental Design Construction $150,000 Total Cost = $3,000,000 PIL-NE $10,000 PIL-NE $2,700,000 PIL-NE PIL-NE hnual Operating Cost = $225,000 NEQUAD-2 Page 56 .SOUTHWEST QUADRANT PARKS PROJECTS FUNDING MATRIX FOR SOUTHWEST QUADRANT PARKS PROJECTS Page 57 CAPITAL PROJECT DESCRIPTION SOUTHWEST QUADRANT PARKS - AVIARA COMMUNITY PARK PROJECT NAME PROJECT NO. 36991 'ROJECT LOCATION: lorthwest corner of Poinsettia Lane and Ambrosia Road. :onstruction of a 24-acre community park that would provide one lighted adult ioccer field, one ballfield, two 112 court basketball court, tot-lot, open turf and bicnic area, parking, and a maintenance building. Also, construction of two 7,000 square foot community center that would include meeting rooms and bark offices. Project includes 1% for Public Art. 7equired to meet Growth Management Standards and identified in the 'arks and Recreation Element of the General Plan. PurDose Estimated Cost Fundina Source PlanningIStudy $235,000 PFF Environmental $15,000 Design $250,000 PFF PFF Construction $1 1,497,890 PFF Total Cost = $1 1,997,890 hnual Operating Cost = $363,750 ZONE194 Page 58 CAPITAL PROJECT DESCRIPTION 36491 PROJECT NO. SOUTHWEST QUADRANT PARKS - AVIARA REIMBURSEMENT AGREEMENT PROJECT NAME I PROJECT LOCATION MAP: Aviareim 'ROJECT LOCATION: 1 the southwest quadrant, at the northern tip of Zone 19, north Of 'oinsettia Lane and west of El Camino Real. 'ROJECT DESCRIPTION: 'his is a reimbursement to the Aviara Land Associates Company made in ccordance with the Aviara Master Plan parks agreement relating to the cquisition of property for the future Zone 19 park site. 'ROJECT NEED .he Zone 19 park is required to meet growth management for park land within le southwest quadrant. :INANCING: PurDose Estimated Cost Fundlna Source Reimbursement $238,000 PIL-sw Total Cost = $238,000 Page 59 CAPITAL PROJECT DESCRIPTION NONE SOUTHWEST QUADRANT PARKS - PARK RESTORATION AND ACQUISITION PROJECT NO. PROJECT NAME PROJECT LOCATION MAP: WOJECT LOCATION: To be determined at various locations in the southwest quadrant of the City WOJECT DESCRIPTION: 3estore existing parks when and as required: acquire additional park land equired by Growth Management Standards; provide additional funds in the uture if budgeted amounts fall short. JROJECT NEED: To meet Growth Management Standards and the General Plan. :INANCING: PurDose Estimated Cost Fundinq Source Restoration/Acquisition $2,700,000 PIL-sw Total Cost = $2,700,000 PKSWRSTR Page 60 CAPITAL PROJECT DESCRIPTION NONE SOUTHWEST QUADRANT PARKS - POINSETTIA COMMUNITY PARK (PHASE 11) PROJECT NO. PROJECT NAME PROJECT LOCATION MAP: \ PROJECT LOCATION: 'oinsettia Community Park in the southwest quadrant east of Paeo del Norte letween Palomar Airport Road and Poinsettia Lane. PROJECT DESCRIPTION: 'hase II of this 42 acre park includes development of the remainder of :he facilities called out in the Master Plan and not developed in earlier 'hases. Amenities will include a community center/gymnasium, enclosed soccer field, tot lots, picnic areas, tennis complex, and additional parking. ncludes 1% for public art. PROJECT NEED: 3equired to meet Growth Management Standards and identified in the Parks md Recreation Element of the General Plan. 'INANCING: Purpose Estimated Cost Fundinq Source Design $600,000 PFF Construction $6,600,000 PFF Total Cost = $7,200,000 innual Operating Cost = $377,500 Page 61 CAPITAL PROJECT DESCRIPTION SOUTHWEST QUADRANT PARKS - POINSETTIA COMMUNITY PARK - SOCCER FIELD STAIRS PROJECT NO. 38361 PROJECT NAME 'ROJECT LOCATION MAP: ~~ ~__ PROJECT LOCATION: 'oinsettia Community Park on Hidden Valley Road. PROJECT DESCRIPTION: Zonstruct concrete stairs from the parking lot sidewalk towards the middle 01 :he soccer field at Poinsettia Community Park. The stairs would be 8' wide, witP iandrails on both sides, and extend 40' from the parking lot down to the soccel ield. PROJECT NEED: This project increases safety and convenience. Most users access the soccel 9eld from the parking lot where a steep embankment exists. Currently there is io designated walkway. Community sports organizations have requested stairs le installed at the field. FINANCING: Purpose Estimated Cost Funding Source Design $5.000 Construction Total Cost = $85,000 GCC $80,000 GCC Page 62 CAPITAL PROJECT DESCRIPTION 38641 SOUTHWEST QUADRANT PARKS - POINSETTIA PARK SYNTHETIC SOCCER FIELD PROJECT NO. PROJECT NAME WOJECT LOCATION MAP: PROJECT LOCATION: Poinsettia Park at existing soccer field site. PROJECT DESCRIPTION: Replace existing natural grass field with a synthetic field filled over with ground- up rubber and sand. The field will have a substantial gravel base with appropriate drainage. PROJECT NEED: This new synthetic field would give our customers/users 365 days per year of usage. Currently, the demand of our users cannot be met and the field is closed almost four months per year. The new sandrubber base field would help to reduce injury to users. There would be no clumps, uneven surface, or slippery conditions. A major factor supporting this project is the savings in labor. A new "fieldturf" soccer field would actually save substantial maintenance costs of $40,000+. The savings would be in water, fertilizer, seed, sod and all related renovation costs. PurDose Estimated Cost Fundina Source Design Construction $690,000 $10,000 Total Cost = $700,000 CEQA Status: Statutorily or categorically exempt. IM&R IM&R Synthfld Page 63 SOUTHEAST QUADRANT PARKS PROJECTS FUNDING MATRIX FOR SOUTHEAST QUADRANT PARKS PROJECTS Page 64 CAPITAL PROJECT DESCRIPTION SOUTHEAST QUADRANT PARKS - ALGA NC PROJECT LOCATION MAP: WOJECT LOCATION: n the Southwest Quadrant, east of El Camino Real and north of and adjacen o future Poinsettia Lane. WOJECT DESCRIPTION: 4cquisition of approximately 16 acres of parkland within future Alga Norte Park rhirty three acres have been set aside by Villages of La Costa Master Plan fol his park site. An undetermined portion of the 33 acres will be required as park kdication depending on the units ultimately developed (for CIP purposes, it is tstimated that 50% or 17 acres may be dedicated). Per a Parks Agreement he City has the right to purchase the remaining acres at $1 75,00O/acre. WOJECT NEED: Additional land will help meet the Civs Park Site Amenities Goals anc hidelines (ballfield and other park facility standards). :INANCING: Purpose Estimated Cost Fundina Source Land Acquisition $4,800,000 PIL-SE Total Cost = $4,800,000 ALGADEDI Page 65 CAPITAL PROJECT DESCRIPTION PROJECT NO. NONE PROJECT LOCATION MAP: PROJECT LOCATION: In the Southeast Quadrant, east of El Camino Real and north of and adjacer to future Poinsettia Lane. PROJECT DESCRIPTION: The first phase of this project will include development of approximatel 30 acres of the proposed total of 33 acres of park. Amenities may includc Dallfields, soccer fields, tennis courts, basketball courts, picnic areas ’estrooms, parking, etc. PROJECT NEED qequired to meet Growth Management Standards and identified in the Park: and Recreation Element of the General Plan. =INANCING: Pumose Estimated Cost Fundina Source Studies $250,000 Design $250,000 Construction $7,750,000 Total Cost = $8,250,000 PFF PFF PFF ALGANOW Page 66 CAPITAL PROJECT DESCRIPTION 38372 SOUTHEAST QUADRANT PARKS - ALGA NORTE PARK PHASE II (50 METER POOL) PROJECT NO. PROJECT NAME PROJECT LOCATION MAP: 'ROJECT LOCATION: n the Southeast Quadrant, tentatively anticipated to be east of El Camino Real md north and adjacent to the future Poinsettia Lane. :onstruction of a 50 meter pool with a pool office facility, showers/restrooms, jarking and perimeter landscaping. 'ROJECT NEED: llga Norte Park is identified in the Parks and Recreation Element as the site of I future public swimming pool. The existing swim complex is currently past :apacity and cannot be used for major swim meet events due to inadequate iize. A new 50 meter pool will assure that adequate swimming facilities will be wailable for current and future residents. Also includes 1% for public art. Purpose Estimated Cost Fundinq Source Planning/Study $250,000 Design $500,000 Construction $5,486,000 Total Cost = $5,936,000 hnual Operating Cost = $660,000 PFF PFF PFF ALGANORl Page 67 CAPITAL PROJECT DESCRIPTION SOUTHEAST QUADRANT PARKS - LEO CARRILLO PARK (PHASES I & 11) PROJECT NAME PROJECT LOCATION MAP ECT J I I , PROJECT NO. 34561 'ROJECT LOCATION: n the Southeast Quadrant, approximately one mile south of Palomar Airpod load adjacent to the future extension of Melrose Drive and future 'oinsettia Lane. 'ROJECT DESCRIPTION: :onstruction of a 6-foot high slumpstone wall around the perimeter of the 26.9 cre Leo Carrillo homestead site. In the natural open space areas, the ,lumpstone wall will give way to vinyl chain link fencing. The project additionally icludes minor grading to accommodate the wall, barrier landscaping along the vall, irrigation and some remedial building restoration and fire protection to ,tabilize the existing historic structures. 'ROJECT NEED: 'erimeter fencing is required to protect the historic site from increased human ltrusion created by the ongoing development of the surrounding property. The roposed building restoration is needed to stabilize those structures no1 reviously restored or stabilized during the 1991 Carrillo Ranch restoration Irogram and fire sprinklers to protect structures from fire. :INANCING: PurDose Estimated Cost Fundina Source Design/Construction $5,568,000 PFF Total Cost = $5,568,000 hnual Operating Cost = $453,000 -EOCARIA Page 68 CAPITAL PROJECT DESCRIPTION NONE SOUTHEAST QUADRANT PARKS - LEO CARRILLO PARK - PHASE 111 PROJECT NO. PROJECT NAME I PROJECT LOCATION MAP: LEOCRlll WOJECT LOCATION: 3oad adjacent to the future extension of Melrose Drive and future PoinsettiE n the Southeast Quadrant, approximately one mile south of Palomar Airpor -ane. WOJECT DESCRIPTION: rhis phase of the project involves development of the remaining elements 01 he park. Anticipated facilities include the remainder of amenities no1 :ompleted in Phase I and II. Project also includes 1% for public art. WOJECT NEED: 3equired to meet Growth Management Standards and identified in the Park: ind Recreation Element of the General Plan. :INANCING: PurDose Estimated Cost Fundinq Source DesignIConstruction $1,703,000 PFF Total Cost = $1,703,000 bnual Operating Cost = $150,000 Page 69 CAPITAL PROJECT DESCRIPTION 35791 SOUTHEAST QUADRANT PARKS - STAGECOACH PARK DRAIN PROJECT NO. PROJECT NAME WOJECT LOCATION MAP: TAGEDRN PROJECT LOCATION: Entrance to Stagecoach Park gymnasium. PROJECT DESCRIPTION: qelocate drain from the entrance to the Community Center/Gymnasium to the iorth. PROJECT NEED: The current drain floods during heavy rains and needs to be moved away from he entrance to the Community Center/Gymnasium. :INANCING: Purpose Estimated Cost Fundina Source Repairs $15,000 GCC Total Cost = $15,000 Page 70 CAPITAL PROJECT DESCRIPTION SOUTHEAST QUADRANT PARKS - ! "n 'ROJECT LOCATION MAP: PROJECT LOCATION: Stagecoach Park along Camino de 10s Coches, at tennis courts. PROJECT DESCRIPTION: nstall steps and concrete surfacing to tennis courts from street. WOJECT NEED: Many tennis court users park, or pick-upldrop-off students using tennis facilities It the park. The existing landscape is destroyed from current foot traffic. This mess will enable public to use courts from close by parking. It would minimize mrrent landscape damage. This project was initiated from public input. =INANCING: Purpose Estimated Cost Fundinq Source Design Construction $5,000 $20,000 GCC GCC Total Cost = f25,ooO SRennis Page 71 DRAINAGE PROJECTS FUNDING MATRIX FOR DRAINAGE PROJECTS (2) See Street Pm@cts - Faraday AvelMelrose Dr Extensions tor details Page 72 CAPITAL PROJECT DESCRIPTION 38041 DRAINAGE PROJECTS - AVIARA PARKWAY STORM DRAIN REIMBURSEMENT PROJECT NO. PROJECT NAME PROJECT LOCATION MAP: T PROJECT LOCATION: Along Aviara Parkway from Cobblestone Road to Encinas Creek. PROJECT DESCRIPTION: Reimbursement to developers for the construction of portions of Master Storm Drainage Facilities "C" and CFA. The constructed facility consisted of approximately 526 feet of 72-inch RCP and 1,257 feet of 66-inch RCP. The developer also constructed a portion of Master Storm Drainage Facility "C consisting of approximately 150 feet of double barreled 8-foot by 8-foot box culvert beneath Aviara Parkway at Encinas Creek. A complete audit of construction costs for eligibility requirements will be undertaken prior to reimbursing the developer from the PLDA fund. The constructed facilities are in excess of the facilities identified in the Master Drainage Plan. Reimbursement will not exceed the value of the improvement costs as estimated in the Master Drainage Plan without first amending the Master Drainage Plan and revising the PLDA fees accordingly. PROJECT NEED: The above described Master Drainage Plan facilities were recently constructed by a developer. Pursuant to the provisions of the Local Drainage Area (PLDA) Fee Program, the developer is eligible to receive reimbursement for the cost of :onstructing these facilities in excess of the PLDA fees required of the developing project. FINANCING: Purpose Estimated Cost Fundina Source Reimbursement $290,000 PLDA 'C" Total Cost = $290,000 Avia-dm Page 73 CAPITAL PROJECT DESCRIPTION 36241 DRAINAGE PROJECTS - CARLSBAD BOULEVARD STORM DRAIN REPLACEMENT PROJECT NO. PROJECT NAME PROJECT LOCATION MAP: PROJECT LOCATION: From Carlsbad Boulevard to the San Diego Northern Railroad tracks just south of the railroad overcrossing. PROJECT DESCRIPTION: Relocate and replace approximately 350 feet of 18-inch corrugated metal would include installation of new storm drain inlets and an outlet. storm drain pipe (CMP) with a reinforced concrete storm drain pipe. Project PROJECT NEED: The existing CMP has corroded away and drainage water is now undermining the soil column above the pipe. Recently, a sinkhole developed which required extensive maintenance repairs. The pipe crosses private property along a previously vacated street right-of-way. At one point, the pipe runs beneath a private structure built many years ago over the vacated street. Replacing the pipe will reduce the potential of local flooding on Carlsbad Boulevard and/or damage to the structure above the pipe as well as additional maintenance repairs. FINANCING: Purpose Estimated Cost Fundina Source PlanningEtudy $7,000 Design Construction $20,000 $53,000 Total Cost = E80,ooO IM&R IM&R IM&R CBSTRMDR Page 74 CAPITAL PROJECT DESCRIPTION DRAINAGE PROJECTS - COLLEGE BOULEVARD STORM DRAIN PROJECT NAME NONE PROJECT NO. 'ROJECT LOCATION MAP: 'ROJECT LOCATION: \long College Boulevard from El Camino Real to the Agua Hedionda Creek. 'ROJECT DESCRIPTION: >onstruction of a 78 and 90 inch storm drain including inlets, outlet, and mess hold appurtenances within future College Boulevard east of El Camino 7eal. The project includes construction of a bridge structure for the College 3oulevard crossing of the Agua Hedionda Creek. This project is identified as acility BL in the Master Drainage and Storm Water Quality Management Plan. WOJECT NEED: The project is required to accommodate development of the property east of El :amino Real at College Boulevard in accordance with the Master Drainage 'Ian. The project will be constructed by a developer as a condition of project tpproval. Reimbursement may occur during earlier years. Until a eimbursement agreement is prepared and agreed to by the City, staff did not vant to pre-commit to a reimbursement schedule. :INANCING: Purpose Estimated Cost Fundinq Source Reimbursement $2,100.000 PLDA "B" Fees Total Cost = $2,100,000 Page 75 CAPITAL PROJECT DESCRIPTION 33381 DRAINAGE PROJECTS - DRAINAGE CHANNEL AND DESILTATION BASINCANNON ROAD PROJECT '0. PROJECT NAME PROJECT LOCATION MAP: L STORMDRl PROJECT LOCATION: Park. East of El Camino Real along the north side of Rancho Carlsbad Mobile Homc PROJECT DESCRIPTION: Construct a desiltation basin at the northeast corner of the Rancho Carlsbac Mobile Home Park and a drainage channel from the basin to El Camino Real. PROJECT NEED: Required by the Drainage Master Plan to handle runoff from futurf development. FINANCING: Pumose Estimated Cost Fundinq Source DesignIConstruction $1,260,459 PLDA Fees Total Cost = $1,260,459 ~ Page 76 CAPITAL PROJECT DESCRIPTION 38651 DRAINAGE PROJECTS - LA COSTA AVENUE STORM DRAIN REPLACEMENT PROJECT NO. PROJECT NAME PROJECT LOCATION MAP: PROJECT LOCATION: entrance into the Marbella condominium complex. On the southerly side of La Costa Avenue approximately 300 feet east of tht PROJECT DESCRIPTION: Avenue and line the pipelines under and to the south of La Costa Avenue Replace the storm drain system down the slope on the south side of La Cost: The project will include the installation of sixty feet of 24" RCP, two storm drair cleanouts, a connection to an existing curb inlet and lining the existing 21" an( 18" CMP. PROJECT NEED: The project is needed to protect La Costa Avenue from damage that couk result from uncontrolled storm water runoff and general public safety concern: relative to the slope erosion. FINANCING: Pumose Estimated Cost Fundina Source Environmental $10,000 IM&R Design $29,000 IM&R Construction $89,500 IM&R Total Cost = $128,500 'roject requires additional CEQA processing. LCstrmdr ~ Page 77 CAPITAL PROJECT DESCRIPTION DRAINAGE PROJECTS - MASTER DRAINAGE PLAN UPDATE PROJECT NAME PROJECT NO. 38721 PROJECT LOCATION MAP VARIOUS LOCATIONS OF THE CITY PROJECT LOCATION: Throughout the City. PROJECT DESCRIPTION: Update the Civs Master Drainage and Storm Water Quality Management Plan based on current growth projections and recent changes in NPDES requirements, and obtain necessary CEQA approval for adoption by City Council. PROJECT NEED: facilities based on the timing of growth projections and NPDES requirements. The Master Plan update will help identify the need for changes to planned The City's Master Drainage and Storm Water Quality Management Plan was completed in 1994. Since 1994, there have been several changes to the Civs growth patterns due to the HMP and HCP that impact growth projections anc densities in various areas of the City. This Master Plan is necessary fol identifying the facilities needed to meet Growth Management Standards. In addition, recent changes in NPDES requirements should be incorporated in the Citfs Storm Water Quality Management Plan. FINANCING: Purpose Estimated Cost Fundinq Source Studies/Rsports $254,000 PLDA Total Cost = $254,000 Project requires additional CEQA processing Dmg-MP CAPITAL PROJECT DESCRIPTION NONE DRAINAGE PROJECTS - MISCELLANEOUS MASTER DRAINAGE FACILITIES PROJECT NO. PROJECT NAME PROJECT LOCATION MAP: VARIOUS LOCATIONS THROUGHOUT THE CITY 'ROJECT LOCATION: larious locations throughout the City. 'ROJECT DESCRIPTION: >onstruction of various maior storm drain facilities within the City. The facilities unded through this program are outlined in the Master Drainage and Storm Mater Management Plan. 'ROJECT NEED: lequired to meet Growth Management Standards and identified in the Master hainage and Storm Water Quality Management Plan. 3NANCING. Purpose Estimated Cost Fundina Source Design/Construction $10,936,000 PLDA Fees Total Cost = $l0,936,000 MASTRDRN Page 79 CAPITAL PROJECT DESCRIPTION DRAINAGE PROJECTS - MISCELLANEOUS ROAD SUBDRAINS PROJECT NAME PROJECT LOCATION MAP: Misc-dm 36811,36812, & PROJECT NO. 3681 3 PROJECT LOCATION: Nine locations throughout Carlsbad: 1. Carlina & Hataca Road 6. Quebrada Circle 2. Calavo Court 7. Linda Lane 3. Park Drive & Cove 4. Alicante & Corte De La Vista 8. Avenida Nieve 5. La Costa Avenue & Cadencia 9. Circulo Adorno PROJECT DESCRIPTION: Preparation of an engineering study report investigating the potential cause: and remedies for various surface/subsurface drainage problems occurring 3 the Various Street locations listed above. Repairs will be made to the exten funding is available. Additional funding requests will be made after more detailed cost estimates are prepared in the study report. PROJECT NEED: 3ased upon citizen request and maintenance staff requests, I. Save maintenance dollars ?. Mitigates hazards from slip and falls 3. Relieve health hazards :INANCING: PurDose Estimated Cost Fundinq Source Planning/Study Planning/Study $30,000 Design $40,000 Construction $275,000 Construction $130,000 Total Cost = $485,000 $10,000 Gas Tax GCC GCC IM&R GCC :EQA Status: Statutorily or categorically exempt. Page 80 CAPITAL PROJECT DESCRIPTION NONE DRAINAGE PROJECTS - PARK DRIVE AND TAMARACK AVENUE STORM DRAIN PROJECT NO. PROJECT NAME PROJECT LOCATION MAP: PROJECT LOCATION: \long Park Drive from Monroe Street to Tamarack Avenue and along Tamarack 4venue from Park Drive to James Drive. WOJECT DESCRIPTION: Installation of approximately 2,100 linear feet of 24-inch diameter reinforcec :onCrete storm drain pipe including access holes and other appurtenances. ,dentified within the Master Drainage Plan as facility "BCA. WOJECT NEED: qequired to prevent flooding of properties west of Park Drive and north 01 ramarack Avenue. The development of a proposed new subdivision east 01 'ark Drive between Tamarack Avenue and Monroe Street will add the existinG jrainage and create a greater need for this master planned drainage facility. FINANCING: PurDose Estimated Cost Fundins Source PlanningIStudy $100,000 PLDA "8" Construction $400,000 PLDA "6 Total Cost = $500,000 Parl-tam Page 81 CAPITAL PROJECT DESCRIPTION 35281,35282, DRAINAGE PROJECTS - SOUTH CARLSBAD VILLAGE STORM DRAIN PROJECT NAME 35283 & 35284 PROJECT NO. ?ROJECT LOCATION MAP: PROJECT ~~~~ ~ ~ ~ 'ROJECT LOCATION: )ak Avenue to Agua Hedionda Lagoon along the easterly portion of the qorthern San Diego Railroad right-of-way. 'ROJECT DESCRIPTION: 2onstruct an underground storm drain system to carry storm water from the ma bounded by Carlsbad Village Drive, Highland Drive, Garfield Street and 4gua Hedionda Lagoon. The majority of the construction will occur within the Vorthern San Diego Railroad right-of-way. WOJECT NEED: The project will reduce flooding and standing water along its route. 'INANCING: Purpose Estimated Cost Fundina Source Construction $4,700,000 Construction TransNeVLocal Construction $1,240,000 TransNeVSTP Construction $1,160,000 PLDA'W Total Cost = $lO,saa,oOo $3,400,000 Gas Tax SCBADVSD Page 82 CAPITAL PROJECT DESCRIPTION DRAINAGE PROJECTS - TAMARACK AND EL CAMINO REAL STORM DRAIN AND SILTATION BASIN PROJECT NAME JROJECT LOCATION MAP: TAMECRSD PROJECT NO. NONE PROJECT LOCATION: kt the southeast corner of Tamarack Avenue and El Camino Real. PROJECT DESCRIPTION: Reimbursement of developer fees for the construction of a 45-inch and 75-inch storm drainage system together with appurtenant inlets, access holes anc sutlet structures. Project also includes the installation of an approximate 32,000 cubic yard siltation basin. The project facilities are identified as facilities 'BF , "BFB and Basin "BFI". PROJECT NEED: 4 developer is currently processing plans for developing a project at the southeast corner of Tamarack Avenue and El Camino Real. As a condition 01 jevelopment, the developer will be required to install the above-describec Master Drainage Plan facilities. The cost of the facilities is expected to exceec the drainage fee obligation for the project, thus creating the need fol eimbursement. The total cost of the facilities as estimated in the Mastel 3rainage Plan is $1,323,000. The estimated fee obligation for the project is !ipproximately $44,000. The amount of potential reimbursement is, therefore, 61,279,000. Reimbursement may occur during earlier years. Until a reimbursement agreement is prepared and agreed to by the City, staff did no1 nrant to pre-commit to a reimbursement schedule. FINANCING: Purpose Estimated Cost Fundina Source Reimbursement $1,279,000 PLDA "B Fees Total Cost E $1,279,000 Page 83 CAPITAL PROJECT DESCRIPTION 38391 DRAINAGE PROJECTS - TAMARACK AND SUNNYHILL STREET DRAINAGE MODIFICATIONS PROJECT NO. PROJECT NAME 'ROJECT LOCATION MAP: PROJECT LOCATION: Along Sunnyhill Drive south of Tamarack Avenue. PROJECT DESCRIPTION: Modify the street grade and/or install drainage catch basins to eliminate cross-street drainage flows and flooding of adjacent residential property. PROJECT NEED: This project is the result of a citizen request to eliminate an existing streei drainage problem along Sunnyhill Drive near its intersection with Tamarack Avenue. Due to the flat grade and lack of curb and gutter improvements alonc this section of Sunnyhill Drive, the street drainage backs up near the Intersection of Tamarack Avenue and flows down an adjacent driveway. The owner of the property at this location has experienced significant damage to his property over the past several years. City maintenance crews previousl) reconstructed the adjacent street improvements to improve drainage at this location. The reconstruction reduced but did not eliminate the problem. Additional reconstruction and/or extension of nearby drainage facilities are ieeded to completely eliminate the problem. Purpose Estimated Cost Fundinq Source Design Construction $25,000 $5,000 Total Cost = $30,000 GCC GCC Tamsun Page 84 CAPITAL PROJECT DESCRIPTION DRAINAGE PROJECTS - TORREJON PLACE STORM DRAIN RELINING PROJECT NAME ~~ ~~ PROJECT LOCATION MAP PROJECT NO. 36901 PROJECT LOCATION: Between Torrejon Place and Marbella condo project located on the north side of La Costa Avenue. PROJECT DESCRIPTION: Repair and reline approximately 162 feet of existing corregated metal pips (CMP) with plastic tube liner. PROJECT NEED: Project is needed to mitigate a potential flooding and slope failure. Project originated from citizen requests due to appearance of eroding slope. FINANCING: Pumose Estimated Cost Fundina Source Construction Design $70,000 $10,000 GCC GCC Total Cost = $so,ooo Torrejon Page a5 SEWER PROJECTS ENCINA WATER POLLUTION CONTROL FACILITY PROJECTS FUNDING MATRIX FOR ENCINA WATER POLLUTION CONTROL FACILITY PROJECTS Page 86 CAPITAL PROJECT DESCRIPTION 34891 ENCINA WATER POLLUTION CONTROL FACILITY - BUILDING IMPROVEMENTS PROJECT NO. PROJECT NAME 'ROJECT LOCATION MAP ROJECT LOCATION: ncina Water Pollution Control Facility at 6200 Avenida Encinas. ROJECT DESCRIPTION: I construct and/or improve existing building facilities at the Encina Watel ollution Control Facility. Cost represents City's pro-rated share of the building iprovements. uilding improvements include: I Additional Office I Employee Locker Facilities I Expanded Laboratory Facilities ROJECT NEED: eeded to provide office and laboratory facilities at the Encina Water Pollutior ontrol Facility. INANCING: PurDose Estimated Cost Fundina Source Design/Construction $1,787,249 City Sewer Connect. Fees Total Cost = $1,787,249 ENCINA-1 Page 87 CAPITAL PROJECT DESCRIPTION PROJECT NO. 34111 ENCINA WATER POLLUTION CONTROL FACILITY - CAPITAL ACQUISITIONS UNIT 1 PROJECT NAME PROJECT LOCATION MAP: I ENCINA-2 PROJECT LOCATION: Encina Water Pollution Control Facility at 6200 Avenida Encinas. PROJECT DESCRIPTION: tarious Capital Improvements. Cost represents City's pro-rated share of thc :spital acquisitions. 'ROJECT NEED: TO upgrade the existing plant. :INANCING: Purpose Estimated Cost Fundinq Source Design/Construction $3,415,037 Sewer Connect. Fees Total Cost $3,415,037 Page aa CAPITAL PROJECT DESCRIPTION 36691 ENCINA WATER POLLUTION CONTROL FACILITY - CAPITAUPLANNING SERVICES PROJECT NO. PROJECT NAME I PROJECT LOCATION MAP: CAPTPLAN ~ ~~ WOJECT LOCATION: ;outh of Palomar Airport Road on the east side of Avenida Encinas. 'ROJECT DESCRIPTION: 'he funds for this project are being set aside on an annual basis to pay for Iecessary capital planning services for the Encina Treatment Plant. TIOJECT NEED Ingoing capital planning for future projects at the Encina Treatment Plant is Necessary to assure that Growth Management Standards for sewer treatmeni ,apacity will continue to be met. Cost represents the City's pro-rated share 01 le CapitaVPlanning Services. :INANCING: Pumose Estimated Cost Fundina Source Planning Services $1,910,023 Sewer Replacement Total Cost = $1,910,023 Page 89 CAPITAL PROJECT DESCRIPTION XAARI ENCINA WATER POLLUTION CONTROL FACILITY - COGENERATION PROJECT PROJECT NO. -. PROJECT NAME 'ROJECT LOCATION MAP ~ ~ ~~ ~ ~~ ~ WOJECT LOCATION: tncina Water Pollution Control Facility at 6200 Avenida Encinas. WOJECT DESCRIPTION: owest power price rates from San Diego Gas & Electric, Encina will be n order to conform with mandated air quality regulations and to ensure the ~pgrading and programming the electrical generators which power the blowers within the sewer treatment facility. Cost represents City's pro-rated share of he cogeneration project. WOJECT NEED To meet air quality regulations. 3NANCING: Pumose Estimated Cost Fundina Source Design/Construction $581,447 City Sewer Connect. Fees Total Cost = $501,447 ENCCOGEN Page 90 CAPITAL PROJECT DESCRIPTION 36681 ENCINA WATER POLLUTION CONTROL FACILITY - FLOW EQUALIZATION PROJECT PROJECT NO. PROJECT NAME 'ROJECT LOCATION MAP: 'ROJECT LOCATION: iouth of Palomar Airport Road on the east side of Avenida Encinas. ROJECT DESCRIPTION: :onstruction of a reservoir/tank to retain flows which exceed the capacity of the scean outfall line. Retained flows would be released during periods of low flow. 'he retention reservoirhank may double as a reclycled water reservoir. 'ROJECT NEED lequired to meet Growth Management Standards and identified in the Master 'Ian of Sewage. Construction of the project will eliminate the need for a econd ocean outfall line. Cost represents the Citys pro-rated share of the low Equalization Project. 'INANCING: Purpose Preliminary Engineering Total Cost = Estimated Cost $8,189,252 $8,109,252 Fundinq Source Sewer Connect. Fees -LOWEQ Page 91 CAPITAL PROJECT DESCRIPTION NONE ENCINA WATER POLLUTION CONTROL FACILITY - PHASE IV EXPANSION DEBT SERVICE PROJECT No. PROJECT NAME I PROJECT LOCATION MAP: TREATPLT ~ ~ ~ ~ 'ROJECT LOCATION: ;outh of Palomar Airport Road on the east side of Avenida Encinas. WOJECT DESCRIPTION ixpansion of the Encina Water Pollution Control Facility to increase treatmeni :apacity from 22.5 million gallons per day to 36.0 million gallons per day of raw iewage. Cost includes bond financing and interest costs. 'ROJECT NEED: 3equired to meet Growth Management Standards and identified in the Mastel 'Ian of Sewage. :INANCING. Pumose Estimated Cost Fundins Source Debt Service $13,082,183 City Sewer Connect. Fees Total Cost = $13,082,183 Page 92 CAPITAL PROJECT DESCRIPTION 38071 ENCINA WATER POLLUTION CONTROL FACILITY - PHASE V EXPANSION PROJECT NO. PROJECT NAME PROJECT LOCATION MAP: PROJECT LOCATION: Encina Water Pollution Control Facility at 6200 Avenida Encinas. PROJECT DESCRIPTION: Expand the Encina Water Pollution Control Facility to buildout for the treatmen! of 45-60 MGD of wastewater. Cost represents City's pro-rated share of the Phase V expansion. PROJECT NEED: To provide for ultimate wastewater treatment capacity of the Carlsbad Sewer District. FINANCING: Purpose Estimated Cost Funding Source DesignIConstruction $11,692,762 City Sewer Connect. Fees Total Cost = $11,692,762 EWPCF-V Page 93 CAPITAL PROJECT DESCRIPTION 38061 ENCINA WATER POLLUTION CONTROL FACILITY - PHASE V EXPANSION - INTERIM CAPACITY PROJECT NO. PROJECT NAME WOJECT LOCATION MAP: PROJECT LOCATION: South of Palomar Airport Road on the east side of Avenida Encinas. PROJECT DESCRIPTION: to meets current needs. The interim improvements include primary Construction of necessary interim improvements to provide additional capacity enhancement facilities and fourth aeration basin facilities. Cost represents Civs pro-rated share of the interim capacity improvements. PROJECT NEED: Required to assure that Growth Management Standards for sewer treatment capacity will continue to be met. FINANCING: Purpose Estimated Cost Fundinq Source Construction $222,298 Sewer Connection Fee Total Cost = $222,298 INTERIM Page 94 CAPITAL PROJECT DESCRIPTION 34491 PROJECT NO. ENCINA WATER POLLUTION CONTROL FACILITY - PLANT REHABILITATION PROJECT NAME 'ROJECT LOCATION MAP: 'ROJECT LOCATION: incina Water Pollution Control Facility at 6200 Avenida Encinas. 'ROJECT DESCRIPTION: 4 consultant will be hired to provide yearly recommendations for machinety ,ehabilitation to ensure the efficient operating ability of the Encina Sewer rreatment Facility. The costs represent the City's pro-rated share to ,ehabilitate the Encina Treatment Plan. 'ROJECT NEED To ensure proper operating ability of Encina sewer treatment. 'INANCING: Purpose Estimated Cost Fundina Source Rehabilitation $2,908,523 City Sewer Replacement Total Cost = $2,906,523 ENCINSEW Page 95 CAPITAL PROJECT DESCRIPTION 36701 ENCINA WATER POLLUTION CONTROL FACILITY - PUMP STATION INTERFACES PROJECT NO. PROJECT NAME I PROJECT LOCATION MAP: INTRFACE 'ROJECT LOCATION: south of Palomar Airport Road on the east side of Avenida Encinas. 'ROJECT DESCRIPTION: The project consists of a review of the possible methods to develop active nonitoring of the various sewer pump stations which pump sewage from )utside agencies. Presently, City capacity at Encina is calculated by subtracting Ither agency flows from the available plant capacity. Development of an active nterface to the pump station would provide more accurate and reliable neasurement of the Cis treatment capacity. 'ROJECT NEED: 3equired to assure that Growth Management Standards for sewer treatmen: - :apacity will continue to be met. =INANCING: PurDose Estimated Cost Fundina Source Construction $59,662 Sewer Replacement Total Cost = $59,662 Page 96 CAPITAL PROJECT DESCRIPTION ENCINA WATER POLLUTION CONTROL FACILITY - TECHNOLOGY MASTER PLAN PROJECT NO. 36661 PROJECT NAME PROJECT LOCATION MAP: PROJECT LOCATION: South of Palomar Airport Road on the east side of Avenida Encinas. PROJECT DESCRIPTION: Development of a master plan to evaluate new treatment technologies fo Dossible incorporation into the Encina Treatment Plant, PROJECT NEED: UeW treatment technologies are constantly being developed. This study wil lelp to evaluate whether any of the new technologies can be used in a COS ?ffective manner at the Encina WPCF. Required to assure that Growtt danagement Standards for sewer treatment capacity will continue to be met. :INANCING: Pumose Estimated Cost Fundins Source Master Plan $1,160,942 Sewer Connection Fee Total Cost = $1,160,942 Page 97 ~ SEWER COLLECTION SYSTEM PROJECTS FUNDING MATRIX FOR SEWER COLLECTION SYSTEM PROJECTS Page 98 CAPITAL PROJECT DESCRIPTION SEWER COLLECTION SYSTEM - AVENIDA ENCINAS GRAVITY SEWER PROJECT NAME PROJECT LOCATION MAP: PROJECT NO. 3581 1 ~~ PROJECT LOCATION: \long north side of Lanakai Mobile Home Park. PROJECT DESCRIPTION: 2onstruct approximately 1,000 feet of 8" gravity sewer. 'ROJECT NEED: The existing forcemain releases unacceptable levels of hydroden sulfide gas esulting in numerous odor complaints and deterioration of the gravity sewer iystem. :INANCING: Purpose Estimated Cost Funding Source Design Construction $50,000 Sewer Replacement $125,000 Sewer Replacement $175,000 Total Cost = Avencsew Page 99 CAPITAL PROJECT DESCRIPTION 33221 SEWER COLLECTION SYSTEM - BUENA VISTA LIFT STATION 81 PUMP ADDITION PROJECT NO. PROJECT NAME PROJECT LOCATION MAP WOJECT LOCATION: 4djacent to the east side of Jefferson Street just south of Buena Vista Creek. 'ROJECT DESCRIPTION: Jpgrade and expand the lift station facility to a capacity of 15.5 million gallons Ier day (MGD). Improvements include revision to building to add a second lump. Project costs will be shared with the Ci of Vista. The below stated loor, new control systems, new back-up generator and the addition of one new :ost estimate is Carlsbad's share of the total project cost. WOJECT NEED: Jeeded to meet future demand. =INANCING: Purwse Estimated Coot Fundlna Source Design/Construction $502,132 Pump Addition Sewer Connect. Fees $233,000 Sewer Connect. Fees Total Cost = $735,132 BUENASTA Page 100 CAPITAL PROJECT DESCRIPTION PROJECT LOCATION MAP: PROJECT LOCATION: From Vancouver Street and Simsbury Court within Calavera Hills north to thl Vista Carlsbad Trunkline located adjacent to Highway 78. PROJECT DESCRIPTION: Construct 1,000 feet of 8-inch diameter sewer, 2,000 feet of 10-inch diamete sewer, and 3,000 feet of 12-inch diameter sewer. PROJECT NEED: As Calavera Hills developed. several temporary sewage lift stations wert constructed due to a lack of existing facilities downstream of the project sites At the time, it was anticipated that the downstream properties would develop ir a timely fashion negating any need for long-term maintenance of the temporan lift stations. The two listed stations are aging and in need of increased repai and maintenance. In lieu of expending the additional funds to upgrad< temporary Stations, Staff is proposing completing the extension of the gravitl lines from the stations to the existing Vista Carlsbad Trunk Line sewer. The lit stations would then be abandoned and removed. FINANCING: Purpose Estimated Cost Fundina Source Land Acquisition Design $20,000 Sewer Benefit Zone Fee Construction $80,000 Sewer Benefit Zone Fee $355,000 Sewer Benefit Zone Fee Total Cost = $455,000 VCTlABC Page 101 CAPITAL PROJECT DESCRIPTION SEWER COLLECTION SYSTEM - EL CAMIF I PROJECT LOCATION MAP: PROJECT LOCATION: Tamarack Avenue. The project is located in El Camino Real between Chestnut Avenue an( PROJECT DESCRIPTION: Extend an 8 PVC sewer northerly in El Camino Real from Tamarack Avenue The project consists of approximately 4,200 linear feet of 8" PVC and elever sewer manholes. PROJECT NEED: Provides sewer service to existing homeowners which are currently on septic systems. Provides a health benefit within an urban area. FINANCING: PurDose Estimated Cost Fundina Source Construction Design Total Cost = $384,000 $36,000 Sewer Replacement Sewer Replacement $420,000 4nnual Operating Cost = $1,600 Page 102 CAPITAL PROJECT DESCRIPTION PROJECT LOCATION MAP FORSTSTA PROJECT NO. 34951 PROJECT LOCATION: Along Forest Avenue at Highland Drive. PROJECT DESCRIPTION: Abandon sewage lift station and construct gravity sewer, PROJECT NEED: -xisting lift station does not meet current electrical and ventilation safef 'equirements, and wet well and mechanical equipment need replacernen! ;ewer pipeline eliminates need for upgrade of facility. :INANCING: - PurDose Estimated Cost Fundina Source Design $100,000 Sewer Replacement Construction $700.000 Sewer Replacement Total Cost = $800,000 Page 103 SEWER COLLECTION SYSTEI DRn~ I PROJECT LOCATION MAP: CAPITAL PROJECT DESCRIPTION NONE M - HOME PLANT LIFT STATION PROJECT NO. IECT 7- NAME P t P fi - - V8 - P F tt P F - P " - 'ROJECT LOCATION: lome Plant Lift Station near Carlsbad Boulevard and northern City limits. 'ROJECT DESCRIPTION: leplace pumps, upgrade wetwell and manifold piping, relocate wetwell entilation system and reconstruct influent sewer manhole. 'ROJECT NEED: 'ield review shows that sand accumulating in the wet well is due to undersized le maintenance costs at the pump station. umps. Installing larger pumps and completing the other upgrades will reduce 'INANCING: PurDose Estimated Cost Fundinq Source Construction Design $250,000 $35,000 Sewer Replacement Sewer Replacement Total Cost = $285,000 'roject requires additional CEQA processing. Homeplnl Page 104 CAPITAL PROJECT DESCRIPTION NONE SEWER COLLECTION SYSTEM - LA COSTA MEADOWS SEWER EXTENSION PROJECT NO. PROJECT NAME 'ROJECT LOCATION MAP: Lcmeadow WOJECT LOCATION: I La Costa from the end of Chorlito Street to El Fuerte Street. 'ROJECT DESCRIPTION: 3emoval of the La Costa Meadows Litt Station and extension of an eight-inch lravity sewer approximately 600 feet to the new gravity sewer constructed in il Fuerte Street by the Rancho Carrillo project developer. 'ROJECT NEED: -he La Costa Meadows Lift Station was constructed to temporarily divert ewage flows into existing Leucadia County Water District (LCWD) facilities. -he diversion was required due to a lack of City sewer facilities located lownstream of the La Costa Meadows project within the Rancho Carrillo Valley. 'he "diversion" agreement between the City and LCWD required the lbandonment of the lift station and connection to City sewer facilities when the lownstream properties were developed and new sewer facilities extended up il Fuerte Street. The needed downstream sewer collection facilities were ecently constructed as part of the Rancho Carrillo project. INANCING: Purpose Estimated Cost Fundinq Source Design Construction $25,000 Sewer Replacement $150,000 Sewer Replacement Total Cost = $175,000 Page 105 CAPITAL PROJECT DESCRIPTION NONE SEWER COLLECTION SYSTEM - LA GOLONDRINA SEWER EXTENSION PROJECT NO. PROJECT NAME PROJECT LOCATION MAP: ~~ ~ ~ ~ ~~ ~~ PROJECT LOCATION: in La Costa from the end of La Golondrina Street north of Poinsettia Lane. PROJECT DESCRIPTION: Removal of the La Golondrina Lift Station and extension of an eight-inch diameter gravity sewer approximately 1,000 feet to the new gravity sewer :onstructed in Poinsettia Lane by the Rancho Carrillo project developer. PROJECT NEED: The La Costa Golondrina Lift Station was constructed to temporarily dived sewage flows into existing Leucadia County Water District (LCWD) facilities. The diversion was required due to a lack of City sewer facilities located downstream of the Ponderosa Homes project within the Rancho Carrillo Valley, The "diversion" agreement between City and LCWD require the abandonmeni Df the lift station and connection to City sewer facilities when the downstream woperties were developed and new sewer facilities extended up the future Poinsettia Lane. The needed downstream sewer collection facilities were recently completed as part of the Rancho Carrillo project. FINANCING: Purpose Estimated Cost Fundina Source Planning/Study Land Acquisition $5,000 Sewer Replacement Design $5,000 Sewer Replacement Construction $100,000 Sewer Replacement $40,000 Sewer Replacement Total Cost = $150,000 Page 106 CAPITAL PROJECT DESCRIPTION SEWER COLLECTION SYSTEM - NIGHTSHADE GRAVITY SEWER EXTENSION PROJECT NAME PROJECT LOCATION MAP: NONE PROJECT NO. PROJECT LOCATION: Blackrail Road west to Nightshade Road. PROJECT DESCRIPTION: Construct 2,000 feet of 8-inch diameter gravity sewer, PROJECT NEED TO COmPlY with Sewer Master Plan to extend gravity sewer to property affected 3y Poinsettia Lane extension. Purpose Estimated Cost Fundinq Source Planning/Study $5,000 Design $45,000 Sewer Connection Sewer Connection Construction $100,000 Sewer Connection Total Cost = S150,OW Nightshade Page 107 CAPITAL PROJECT DESCRIPTION SEWER COLLECTION SYSTEM - NC REHABILITATION - EL ( Don PROJECT LOCATION MAP: 35371 I AGUA HEDIONDA INTERCEPTOR PROJECT NO. NO REAL TO KELLEY WOJECT LOCATION: Uorth bank of Agua Hedionda Lagoon and Creek, from El Camino Real to :ove Drive (Foxes Landing Sewer Lift Station). WOJECT DESCRIPTION: b Design and construct access road to facilitate gravity sewer maintenance from El Camino Real to Park Drive (about 5,700 LF). Enhancements to involve public trail improvements. D Design and construct erosion protection for access road and existing gravity sewer where needed. b Evaluate sewer realignment to relocate access holes away from creek to prevent inundation, reduce inflow, and improve access for maintenance. D Assess all access holes (45 AH max), replacehhabilitate as necessary. D Conduct environmental survey and prepare documents necessary to D Design and construct mitigation site. 'ROJECT NEED: mplementation of the project will avoid accidental sewage sDill to the laaoon obtain permits. md creek, reduce inflow io the sewer, and allow for mahtenance vehicles to iccess the sewer. :INANCING: Purpose Estimated Cost Funding Source Environmental $1 57.700 PropertyAcquisition Sewer Replacement $85,800 Design Sewer Replacement Construction $1,840.000 $144,000 Sewer Replacement Sewer Replacement Total Cost = $2,207,600 'roject requires additional CEQA processinq. Naguaecr Page 108 CAPITAL PROJECT DESCRIPTION NONE SEWER COLLECTION SYSTEM - NORTH AGUA HEDIONDA TRUNK SEWER REACH NAHTlA PROJECT No. PROJECT NAME PROJECT LOCATION MAP: 'ROJECT LOCATION: dong the north side of Tamarack Avenue from El Camino Real to Calavera lills Treatment Plant. 'ROJECT DESCRIPTION: temove existing forcemain and construct 5,000 feet of 8-inch diameter gravity ewer pipeline. 'ROJECT NEED: Vhen the Calavera Hills Sewer Treatment Plant was initially constructed, there (as no provision for extending a gravity sewer line downstream of the plant. Vhen the decision was made not to activate the plant, the sewer mains lischarging into the plant site were connected to force main pipe which was riginally intended to carry flow up to the plant from projects located lownstream of the plant. The existing force main is not sloped properly to landle gravity flow and lacks the necessary access holes for proper naintenance. Removal of the existing force main and construction of a new lravity line will complete this portion of the sewer master plan. :INANCING: PurDose Estimated Cost Fundina Source PlanninglStudy $58,000 Design $100,000 Sewer Replacement Sewer Replacement Construction $1,375,200 Sewer Replacement Total Cost = $1,533,200 NAHTlA CAPITAL PROJECT DESCRIPTION PROJECT LOCATION MAP: NBATINT PROJECT LOCATION: Vorth side of Batiquitos Lagoon from El Camino Real west to North Batiquito! -ift Station. WOJECT DESCRIPTION: luring high rainfall periods, the Batiquitos Lagoon level rises to flood above tht ?xisting access road and access hole covers. The project will design a ner mess road to the sewer and raise access hole covers to a higher elevatior vhere required. 'ROJECT NEED: TO avoid accidental sewage spill, reduce inflow to the sewer, and allow fo naintenance vehicles to access the sewer. VNANCING: PurDose Estimated Cost Fundina Source Design $270,000 Sewer Replacement Environmental $80,000 Sewer Replacement Construction Land Acquisition $30,000 Sewer Replacement $620,000 Sewer Replacement Total Cost = fl,ooO,Ooo Page 110 CAPITAL PROJECT DESCRIPTION 'ROJECT LOCATION MAP: PROJECT LOCATION: End of Gabbiano Lane. PROJECT DESCRIPTION: 'rovide structural modifications to dry well and wet well. Modify mechanica md electrical systems as needed to eliminate failures. 'ROJECT NEED: Fxisting structure does not allow wet well to be cleaned out. Existing structure leeds openings to allow lifl station pumps to be removed. Existing electrical gystem needs to be modified to stop pumps from locking out unnecessarily. :INANCING: PurDose Estimated Cost Fundincl Source Design $10,000 Sewer Replacement Construction $322,000 Sewer Replacement Total Cost = $332,000 Northbat Page 111 CAPITAL PROJECT DESCRIPTION SEWER COLLECTION SYSTEM - PALMER WAY SEWER EXTENSION PROJECT NAME PROJECT NO. 35391 'ROJECT LOCATION MAP WOJECT LOCATION: :ram Cougar Drive north to proposed housing tract in the extension of Palmer May. WOJECT DESCRIPTION: 'he existing sewer in Palmer Way terminates at Cougar Drive. Sewer service o the industrial park north of Faraday Avenue and east of El Camino Real is lrovided by existing private lift stations for each major building complex. listrict maintenance personnel are often called to correct problems at the itations when they occur. By extending the existing gravity sewer in Palmer Yay, the private lift stations can be eliminated. Construct 800 feet of &inch liameter pipe. 'ROJECT NEED: b eliminate sewage spills from failed private li stations. :INANCING: Pumose Estimated Cost Fundina Source Design/Construction $125,000 Sewer Replacement Total Cost = $125,000 PALMERWY - Page 112 CAPITAL PROJECT DESCRIPTION 381 0 SEWER COLLECTION SYSTEM - POINSETTIA LANE SEWER RELOCATION PROJECT NO. PROJECT NAME PROJECT LOCATION MAP: 'ROJECT LOCATION: 'oinsettia Lane near railroad. 'ROJECT DESCRIPTION: 3elocate 2,000 feet of 21" sewer. 'ROJECT NEED: The existing sewer facilities beneath the Poinsettia Lane bridge crossing the SDNRR are inaccessible and are difficult to maintain properly. The proposed videning of the Poinsettia Lane bridge improvements will exacerbate the ~roblem. The proposed relocation project will be timed to coincide with the levelopment of the adjacent Poinsettia Properties project to reduce costs and ?liminate the need to pay for the necessary easements. :INANCING: PurDose Estimated Cost Fundinq Source Design Construction Total Cost $400,0oO $100,000 Sewer Replacement $300,000 Sewer Replacement Poin-sew Page 113 CAPITAL PROJECT DESCRIPTION SEWER COLLECTION SYSTEM - POINSElTIA SEWAC DDn 'ROJECT LOCATION MAP: NONE FT STATION ODOR AND NOISE ABATEMENT PROJECT NO. ~ PROJECT LOCATION: 2425 Poinsettia Lane - Poinsettia Sewage Lift Station PROJECT DESCRIPTION: ducting, to treat foul air from the lift station wetwell to reduce corrosion and Installation of an activated carbon adsorption odor control system, including control odor emissions, and sound enclosures for outdoor fans. PROJECT NEED: The existing lift station emits odors that can reach future developments in close proximity to the lift station. In addition, uncovered supply and exhaust fans generate noise that reach or exceed 60 dBa at the fenceline. Control of the odors and reduction of noise will promote "good neighbor" policy and a higher level of service to adjacent residents. ~~ FINANCING: PurDose Estimated Cost Fundinq Source Environmental $6,000 Design Sewer Replacement Construction $1 5,700 Sewer Replacement $200,100 Sewer Replacement Total Cost = $221,800 Annual Operating Cost = $11,000 CEQA Status: Statutorily or categorically exempt. Poinlifl Page 114 CAPITAL PROJECT DESCRIPTION 3451 1 SEWER COLLECTION SYSTEM - SEWER ACCESS HOLE REHABILITATION PROJECT NO. PROJECT NAME 'ROJECT LOCATION MAP: VARIOUS LOCATIONS THROUGHOUT THE CITY 'ROJECT LOCATION: larious locations within the City sewer line. 'ROJECT DESCRIPTION: :lean and refurbish access holes older than 30 years, or replace if not able to efurbish. The access holes needing repair will be determined during yearly Ispection. 'ROJECT NEED: daintain system in good condition to avoid major problems. :INANCING: Purpose Estimated Cost Fundina Source Design/Construction $2,800,000 Sewer Replacement Total Cost = $2,800,000 ;WRREFUR Page 115 CAPITAL PROJECT DESCRIPTION 38081 SEWER COLLECTION SYSTEM - SEWER CONNECTION FEE UPDATE PROJECT NO. PROJECT NAME PROJECT LOCATION MAP NIA Swrfee 'ROJECT LOCATION: 41A 'ROJECT DESCRIPTION: 'repare a fee study report to update and reevaluate the existing sewel ionnection fee program. 'ROJECT NEED: -he recent update to the Sewer Master Plan includes facilities and/or cosi stirnates which will differ from the previous list of facilities and/or cosi stirnates considered when the existing sewer connection fee program was Ipproved. Development potentials have also changed over the past few years LS a result of emerging habitaffenvironmental constraints. These changes nake it necessary to reevaluate the existing fee structure. This update will be iompleted after the update to the Sewer Master Plan. :INANCING: PurDose Estimated Cost Fundinq Source Fee Study Report $15,000 Sewer Conn. Total cost = $15,000 Page 116 CAPITAL PROJECT DESCRIPTION 38401 SEWER COLLECTION SYSTEM - SEWER LIFT STATION - MISCELLANEOUS REPAIRS & UPGRADES PROJECT NO. PROJECT NAME PROJECT LOCATION MAP: 'ROJECT LOCATION: iome Plant, Villas, Terramar and Gateshead sewer lift stations. 'ROJECT DESCRIPTION: ?epair and upgrade various sewer lift stations throughout the City. Repairs nclude replacing existing malfunctioning alarm dialers at the Home Plant anc lillas Sewer Lift Stations; replacing old pumps at the Terramar, Villas ant sateshead Sewer Lift Stations; replacing existing gas monitoring units, and the vet well lining at the Villas Sewer Lift Station. 'ROJECT NEED: -hew projects are needed to properly maintain the existing sewer lift station: ind prevent potential sewage spills. Many of the existing stations are 15 years )r older and require periodic upgrades and/or replacement of pumps anc !lectrical systems to increased maintenance costs. :INANCING: Purpose Estimated Cost Fundina Source Design Construction $40,000 Sewer Replacement $1 95,380 Sewer Replacement Total Cost = $235,380 :EQA Status: Statutorily or categorically exempt. SewerlR Page 117 CAPITAL PROJECT DESCRIPTION 34521 SEWER COLLECTION SYSTEM - SEWER LINE REFURBISHMENT/REPLACEMENT PROJECT NO. PROJECT NAME PROJECT LOCATION MAP: VARIOUS LOCATIONS THROUGHOUT THE CITY SEWERLNE ~ 'ROJECT LOCATION: larious locations within the City sewer limits. 'ROJECT DESCRIPTION: :lean and refurbish existing sewer lines older than 30 years or replace if noi lble to refurbish. The sewer lines needing repair will be determined by yearl) V inspection. 'ROJECT NEED: Aaintain system in good condition to avoid major problems. :INANCING: Purpose Estimated Cost Fundincl Source Design/Construction $7,868,182 Sewer Replacement Total Cost = 57,868,182 Page 118 CAPITAL PROJECT DESCRIPTION LOCATIONS THROUGHOUT THE CITY Th F 1 F 1 - - C C F 1 f; a tl a C n t - F I - MASTER PLAN UPDATE 38701 & 38702 PROJECT NO. ~ 'ROJECT LOCATION: 'hroughout the City. 'ROJECT DESCRIPTION: Jpdate the City's Water, Sewer and Reclaimed Water Master Plans based on ,urrent growth projections and obtain necessary CEQA approval through the :ompletion of an EIR for adoption by City Council. 'ROJECT NEED: acilities based on the timing of growth projections. The Ciws Water, Sewer -he Master Plan update will help identify the need for changes to plannea md Reclaimed Water Master Plans were last updated in 1997. Since 1997, +ere have been several changes to the City's growth patterns due to the HMF Ind HCP that impact growth projections and densities in various areas of the Xty. These Master Plans are necessary for identifying the facilities needed tc neet Growth Management Standards. In addition, the current Master Plans lave not been CEQA approved and, therefore, not adopted by Council. ~ ~~ Estimated Cost Fundinq Source $205,698 Sewer Connection Fee $98,792 Sewer Replacement Total Cost = $304,500 'reject requires additional CEQA processing. Mstrplan Page 119 CAPITAL PROJECT DESCRIPTION SEWER COLLECTION SYSTEM - SEWER MONITORING PROGRAM PROJECT NAME 33241 PROJECT NO. 'ROJECT LOCATION MAP: NIA ~~ ~ ~~ ~~ PROJECT LOCATION: Citywide within the City's sewer service area. PROJECT DESCRIPTION: the Carlsbad sewer service area. Perform sewer flow measurements when Monitor sewer flows and remaining capacities in lines and pump stations within required. Update Sewer Master Plan and review adequacy of sewer fees as required. PROJECT NEED: To ensure that sewer flows do not exceed line capacity and to ensure timely upgrades of sewer systems in conformance with the Growth Management Standards. FINANCING: Purpose Estimated Cost Fundina Source Monitoring $587,138 Sewer Connect. Fees Total Cost = $587,138 EWERMON ~ ~ Page 120 CAPITAL PROJECT DESCRIPTION 35831 & 38281 SEWER COLLECTION SYSTEM - SOUTH AGUA HEDIONDA LIFT STATION AND FORCE MAIN PROJECT NO. PROJECT NAME PROJECT LOCATION MAP: WOJECT LOCATION: 4long Cannon Road from Armada Drive to El Camino Real. :onstruct 350 HP sewage lift station and force main in Cannon Road Reaches SAHl, SAH2, and SAH3. WOJECT NEED: To provide sewer service to those areas generally tributary to the south side oi 4gua Hedionda Lagoon. :INANCING: Purpose Estimated Cost Fundina Source Planning/Study $100,000 Sewer BenefiVArea Fee Land Acquisition $100,000 Design Sewer BenefiVArea Fee Construction $4,621,494 $740,000 Sewer Benefit Area Fee Construction Sewer Benefit Area Fee $610,000 City of Vista Total Cost = $6,171,494 'ROJECT STATUS: Iesign began February 2002. Geotechnical investigation being performed. \pplication for CUP/ CDP being prepared. SOAGPHII Page 121 CAPITAL PROJECT DESCRIPTION 3182 & 3855 SEWER COLLECTION SYSTEM - VISTNCARLSBAD INTERCEPTOR SEWER REACHES VC5A.5B TO 11A PROJECT NO. PROJECT NAME 'ROJECT LOCATION MAP 'ROJECT LOCATION: dong Jefferson Street from Interstate 5 to Oak Avenue, along Oak Avenue rom Jefferson Street to the west side of the railroad right-of-way, along the ailroad right-of-way from Oak Street to the Agua Hedionda Lagoon. -he project also includes a spur line connection along Chestnut Avenue from he railroad right-of-way to Harding Street. 'ROJECT DESCRIPTION: 3eplace the existing VistdCarlsbad Interceptor Sewer from Reaches Vc5 to lCllA with a new 36 to 78 diameter pipeline. WOJECT NEED: 3equired to handle buildout flows and to replace deteriorated Pipeline. :INANCING: Puroose Design/Construction Total Cost = Estimated Cost Fundins Source $1 2,223,433 Sewer Connection Fee $702,020 Sewer Replacement $695,880 TransNet Local $1 3,621,330 ' Cost includes Vista's share. PROJECT STATUS 2onstruction activities are ongoing. VC-SEWER Page 122 CAPITAL PROJECT DESCRIPTION SEWER COLLECTION SYSTEM - VISTNCARLSBAD INTERCEPTOR AGUA HEDIONDA LIFT STATION (VC 12) PROJECT NAME 34921 PROJECT NO. 'ROJECT LOCATION MAP: PROJECT LOCATION: On the south shore of Agua Hedionda Lagoon adjacent to the east side of the railroad tracks. PROJECT DESCRIPTION: Upgrade existing pump station to increase capacity for buildout conditions. Replace existing pumps with larger capacity pumps and associated appurtenances. Cost is Carlsbads share which is 50% of the total cost of xoject. PROJECT NEED: Required to handle sewage flows for buildout population. Purvose Estimated Cost Fundinq Source Environmental $508,800 Design Sewer Connection Fee $610,600 Construction $5,130,500 Sewer Connection Fee Sewer Connection Fee Total Cost = $6,250,000 Includes Vista's share of costs. 4nnual Operating Cost = $149,000 Agualift Page 123 CAPITAL PROJECT DESCRIPTION NONE SEWER COLLECTION SYSTEM - VISTNCARLSBAD INTERCEPTOR SEWER REACH VC11B PROJECT No. PROJECT NAME 'ROJECT LOCATION MAP: 'ROJECT LOCATION: 4long NCTD railroad right-of-way from Olive Avenue south across Agua iedionda Lagoon to the Agua Hedionda Lift Station. VIOJECT DESCRIPTION: +?place existing VistalCarlsbad Interceptor Sewer Reach VCllB and bridge lesigned as parf of trail system. wood trestle) with 48" pipeline and a new concrete bridge. Bridge shall be WOJECT NEED: qequired to handle buildout flows to replace existing pipeline and the WOOC ]ridge. The new bridge is also to be used for City trail system. FINANCING: PurDose Estimated Cost Environmental $100,000 Design $200,000 Construction $2,600,000 Total Cost = $2,900,000 * Cost includes Vista's share of costs. Funding Source Sewer Connection Fee Sewer Connection Fee Sewer Connection Fee \nnual Operating Cost = $568 EWVC11B Page 124 CAPITAL PROJECT DESCRIPTION PROJECT LOCATION MAP: C vc13vc15 'ROJECT LOCATION: 'rom the Agua Hedionda Lift Station south to the Encina Water Pollutior :ontrol Facility. 'ROJECT DESCRIPTION: 3eplace existing VistdCarlsbad Interceptor Sewer Reaches VC13 to VClt vith a 54" pipeline. 'ROJECT NEED Wired to handle buildout flows and deteriorated pipelines. :INANCING: Purpose Estimated Cost Fundinq Source Design $700,000 Construction Sewer Connection Fees $9,500,000 Sewer Connection Fees Total Cost = $10,200,000 * Cost includes Vista's share, Page 125 CAPITAL PROJECT DESCRIPTION 3867 SEWER COLLECTION SYSTEM - VISTNCARLSBAD INTERCEPTOR SEWER PROJECT NO. REHABILITATION REACHES 1 THRU 3 PROJECT NAME PROJECT LOCATION MAP: /PROJECT PROJECT LOCATION: Highway 78 from Jefferson Street to the City limits. Reaches 1, 2 and 3 of the VistdCarlsbad Interceptor Sewer located south of PROJECT DESCRIPTION: Reaches 1,2 and 3 of the VistdCarlsbad (V/C) 36 Ductile Iron Interceptor and manholes have corroded significantly. Pipes will be lined with PVC and manholes will be rehabilitated. V/C interceptor is jointly owned by the City of Vista and the City of Carlsbad. Through a joint City agreement, Carlsbad is responsible for 15% of the cost for maintenance and improvements to Reaches 1, 2 and 3. The City of Vista is responsible for managing projects within these reaches. Costs below reflect the City of Carlsbads share of project. PROJECT NEED: 0 Increase safety: Pipeline and manholes have been determined to be in poor condition. Risk of pipeline failure and sewage spill in environmentally sensitive area exists. 0 Unmet needs: Manholes are currently unlined. Concrete is exposed tc hydrogen sulfide environment. Lining will increase longevity of the manhole. Lining of pipeline will reduce ground water infiltration into the wastewater system. FINANCING: Purpose Estimated Cost Funding Source Design $32,940 Sewer Replacement Construction $344,135 Sewer Replacement Total Cost = $377,075 Project requires additional CEQA processing. VCinierc Page 126 WATER PROJECTS I ~ WATER DISTRIBUTION SYSTEM PROJECTS FUNDING MATRIX FOR WATER DISTRIBUTION SYSTEM PROJECTS Page 127 CAPITAL PROJECT DESCRIPTION WATER DISTRIBUTION SYSTEM - “D” RESERVOIR PHASE II PROJECT NAME PROJECT LOCATION MAP I DRESERV2 33761 & 33762 PROJECT NO. PROJECT LOCATION: 4djacent to the existing “D’ Reservoir. PROJECT DESCRIPTION: >onstruction of second phase improvements to this site include an 8.5 rnilliol 3allon reservoir. WOJECT NEED: 4dditional reservoir capacity is required to serve the entire southwester1 luadrant and adjacent areas. VNANCING: PurDose Estimated Cost Fundina Source Design/Construction $3,984,500 Water Connection Fee Design/Construction $1,328,000 Replacement Total Cost = $5,312,500 Page 128 CAPITAL PROJECT DESCRIPTION WATER DISTRIBUTION SYSTEM - 580 ZONE SECONDARY SUPPLY PROJECT NAME PROJECT LOCATION MAP: 580ZONE PROJECT NO. NONE PROJECT LOCATION: \long Oceanside/Carlsbad city limits between future Cannon Road an1 ?xisting T.A.P. 21-inch line. 'ROJECT DESCRIPTION: nstall 1,750 LF of 16-inch line. (680-550 H.G. Zone) 'ROJECT NEED: TO meet the future demands of the area. Developer to pay 50% of cost. :INANCING: PurDose Estimated Cost Fundina Source Design/Construction $256,000 Water Connection Fee Design/Construction $256,000' Other - Developer Total Cost = $512,000 Developer cost not shown in CIP schedules. ~~ Page 129 CAPITAL PROJECT DESCRIPTION WATER DISTRIBUTION SYSTEM - 680 ZONE SUPPLY PROJECT NAME NONE PROJECT NO. I PROJECT COCATION MAP: ~~ 680ZONE - PROJECT LOCATION: Along Oceanside/Carlsbad city limits between Maerkle Dam and future Cannon Road. PROJECT DESCRIPTION: Construct 16" 680 line from Masrkle Resetvoir along the Oceanside boundary to Cannon Road with a pressure regulating station (1019 to 680). Install 1,750 LF of 16" line and a pressure regulating station. PROJECT NEED: To meet the future demands of the area. FINANCING: PurDose Estimated Cost Fundina Source DesignIConstruction $550.000 Water Connection Fee Total Cost = $550,000 ~ Page 130 CAPITAL PROJECT DESCRIPTION 3841 1 WATER DISTRIBUTION SYSTEM - AVIARA PARKWAY (POINSETTIA LANE TO PALOMAR AIRPORT ROAD) PROJECT NO. PROJECT NAME PROJECT LOCATION MAP: 'ROJECT LOCATION: :uture Aviara Parkway from Poinsettia Lane to Palomar Airport Road. 'ROJECT DESCRIPTION: nstall 4,400 LF of 12-inch line and 3,150 LF of 16-inch line. Each pipeline is or a different pressure zone. In 375 H.G. Zone and 550 H.G. Zone). 'ROJECT NEED: o meet the future demands of the area. Developer to pay 50% of the cost. VNANCING: Purpose Estimated Cost Fundina Source Construction $495,000 Water Connection Fee Construction $495,000 Other - Developer Total Cost = $990,ooo Developer cost not shown in CIP schedules. 4viara Page 131 CAPITAL PROJECT DESCRIPTION 38421 WATER DISTRIBUTION SYSTEM - CALAVERA HILLS WATER BOOSTER STATION PROJECT NO. STANDBY GENERATOR PROJECT NAME 'ROJECT LOCATION MAP WOJECT LOCATION: :allege Boulevard at Carlsbad Village Drive. 'ROJECT DESCRIPTION: %rnish and install standby generator and generator building at Calavera Hills 3ooster Pump Station. 'ROJECT NEED: The existing booster station at this location does not have backup power. If an ?lectrical power outage occurs, the pump station will not operate. The addition )f a permanent generator at this facility will increase reliability in accordance Nith Council goals. :INANCING: Purpose Estimated Cost Fundina Source Planning/Study $20,000 Design Water Connection $30,000 Water Connection Construction $200,000 Water Connection Total Cost = $250,000 Calhills Page 132 CAPITAL PROJECT DESCRIPTION 35341 WATER DISTRIBUTION SYSTEM - CANNON ROAD WEST TRANSMISSION MAIN PROJECT NO. PROJECT NAME PROJECT LOCATION MAP: 'ROJECT LOCATION: n Cannon Road from LEG0 Drive east to El Camino Real. WOJECT DESCRIPTION: Jpsize 5,135 feet of 8-inch pipeline to 16-inch pipeline in Cannon Road 'xtension, install 568 feet of 8-inch pipeline in El Camino Real notth of Cannon qoad, construct a pressure reducing station, install 160 feet of casing pipe at 4gua Hedionda Bridge, install 7,300 feet of 24-inch recycled water pipeline WOJECT NEED: To meet the future demands of the area and relocate line to Cannon Road. )eveloper to pay 50% of cost. :INANCING: Purpose Design Constructic Estimated Cost Fundins Source $100,000 Water Connection M $2,764,457 Water Connection Total Cost = $2,864,457 CANNON Page 133 CAPITAL PROJECT DESCRIPTION 35991 WATER DISTRIBUTION SYSTEM - CARLSBAD BOULEVARD (MANZANO DRIVE TO AVENIDA ENC2 PROJECT NO. PROJECT NAME WOJECT LOCATION MAP: XADBLVD 'ROJECT LOCATION: >arkbad Boulevard, Manzano Drive to Avenida Encinas. 'ROJECT DESCRIPTION: nstall2,500 LF of 10-inch line in Manzano Drive. In 255 H.G Zone) )ROJECT NEED To relocate and meet the future demands of the area. :INANCING: PurDose Estimated Cost Construction $133,000 Construction $142,000 Funding Source Water Connection Fee Water Replacement Total Cost = $275,000 Page 134 CAPITAL PROJECT DESCRIPTION NONE WATER DISTRIBUTION SYSTEM - COLLEGE BOULEVARD FROM CANNON ROAD TO PROJECT NO. CARLSBAD VILLAGE DRIVE PROJECT NAME PROJECT LOCATION MAP: MKE PROJECT LOCATION: College Boulevard from future Cannon Road to Carlsbad Village Drive. PROJECT DESCRIPTION: Install 3,560 linear feet of 16-inch line and a pressure regulating station. Install 2,000 linear feet of 18-inch line. (In 490-446 H.G Zone) PROJECT NEED: To meet the future demands of the area. Developer to pay 50% of the cost. FINANCING: PurDose Estimated Cost Design/Construction $550,000 Design/Construction $550,000 Total Cost = s1,1oo,oM) 'Developer cost not shown in CIP schedules. Fundina Source Other - Developer Water Connection Fee COLLEGE3 Page 135 CAPITAL PROJECT DESCRIPTION WATER DISTRIBUTION SYSTEM - COLLEGE BOULEVARD - EL CAMINO REAL TO PROJECT NO. 38171 AGUA HEDIONDA CREEK PROJECT NAME PROJECT LOCATION MAP: WOJECT LOCATION: >allege Boulevard from El Carnino Real north 400 feet. WOJECT DESCRIPTION: nstall400 linear feet of 36-inch D.I.P. :In 490 H.G. Zone) WOJECT NEED: The developer (Sycamore Creek) will be constructing full street improvements vith the waterlines. :INANCING: PurDose Estimated Cost Fundina Source DesignKonstruction $235,000 Water Connection Fee Total Cost = $235,000 :OLLEGEl Page 136 CAPITAL PROJECT DESCRIPTION PROJECT LOCATION MAP: COLLEGE5 PROJECT LOCATION: College Boulevard from 400’ north of El Camino Real northerly to futur Cannon Road. PROJECT DESCRIPTION: Install 3,850 LF of 16-inch line. (In 490 H.G Zone) PROJECT NEED: TO meet the future demands of the area. Developer to pay 50% of cost. FINANCING: Pumose Estimated Cost Fundina Source Design/Construction $421,000 Water Connection Fee Design/Construction $421,000 * Other - Developer Total Cost = $842,000 ‘Developer cost not shown in CIP schedules Page 137 CAPITAL PROJECT DESCRIPTION 36631 WATER DISTRIBUTION SYSTEM - COLLEGE BOULEVARD MAERKLE RESERVOIR TO PROJECT NO. AGUA HEDIONDA CREEK PROJECT NAME 'ROJECT LOCATION MAP 'ROJECT LOCATION ?om Maerkle Reservoir west to the future extension of College Boulevard then iouth along College Boulevard to the Agua Hedionda Creek. 'ROJECT DESCRIPTION: nstall8,500 LF of 33-inch waterline. In 490 H.G. Zone). 'ROJECT NEED: To meet immediate and future demands of the District. :INANCING: Purpose Estimated Cost Fundina Source Design Construction $340,000 $2,000,000 Water Replacement Water Replacement Total Cost = $2,340,000 MAERKLE2 Page 136 CAPITAL PROJECT DESCRIPTION I I PROJECT LOCATION MAP: I ECRPARSO PROJECT LOCATION: El Camino Real - Palomar Airport Road South 7,000 LF. PROJECT DESCRIPTION: %place 20” steel water line in El Camino Real South 7,000 LF with a neb 20-inch water line. ’ROJECT NEED +.?placing old Steel water line to avoid high maintenance costs and exten( lipeline to new Poinsettia Lane road alignment. =INANCING: PurDose Estimated Cost Fundlnq Source Design Construction $1 00,000 $3,125,000 Water Replacement Water Replacement Total Cost = $3,225,000 Page 139 CAPITAL PROJECT DESCRIPTION PROJECT LOCATION MAP: PROJECT LOCATION: El Camino Real at Kelly Drive. PROJECT DESCRIPTION: 'nstall300 LF of 12 line. :In 490 H.G Zone) 'ROJECT NEED: TO meet the future demands of the area. :INANCING: Purpose Estimated Cost Fundina Source Design/Construction $94,000 Water Connection Fee Total Cost = $94,000 ECRCROSS Page 140 CAPITAL PROJECT DESCRIPTION WATER DISTRIBUTION SYSTEM - EL CAMINO REAL TRANSMISSION MAIN LISA STREET TO KELLY DRIVE PROJECT NAME I PROJECT LOCATION MAP: ECR-tran PROJECT NO. 38441 'ROJECT LOCATION: il Camino Real from Lisa Street to Kelly Drive. 'ROJECT DESCRIPTION: ;onstruct 2,000 feet of 10-inch diameter pipeline from Lisa Street tc :elly Drive. 'ROJECT NEED: '0 provide a looping water pipeline in the area. Needed to meet master plar equirements and increase reliability. :INANCING: Purpose Estimated Cost Fundins Source Design $50,000 Water Connection Fund Construction $200,000 Water Connection Fund Total Cost = $250,000 Page 141 CAPITAL PROJECT DESCRIPTION NONE WATER DISTRIBUTION SYSTEM - EL CAMINO REAL FROM CASSIA TO POINSETTIA PROJECT NO. PROJECT NAME 'ROJECT LOCATION MAP: PROJECT LOCATION: In El Camino Real between Cassia Road and Poinsettia Lane. PROJECT DESCRIPTION: Design and construct approximately 1,900 feet of 30-inch steel potable water transmission main in El Camino Real from Cassia Road to Poinsettia Lane using open trench excavation. The steel pipe will be cement-mortar lined, tape-wapped. and cement coated. The pipeline will also be cathodically protected with magnesium anode beds. PROJECT NEED: To meet the future demands of the area per Growth Management Standards. FINANCING: PurDose Estimated Cost Fundinq Source Design $84,000 Construction Water Connection Fees $752,000 Water Connection Fees Total cost = $836,000 Annual Operating Cost = $2,692 CEQAStatus: Statutorily or categorically exempt. ECR-Cass Page 142 CAPITAL PROJECT DESCRIPTION 38431 WATER DISTRIBUTION SYSTEM - EL CAMINO REAL TRANSMISSION MAIN FROM PROJECT NO. FARADAY AVENUE TO COUGAR DRIVE PROJECT NAME 'ROJECT LOCATION MAP: \\W# ROJECT LOCATION: I Camino Real from Faraday Avenue north to Cougar Drive and pressure tducing station north side of Faraday Avenue. 'ROJECT DESCRIPTION: :onstruction of 1,500 feet of 24-inch diameter transmission main and pressure ?ducing station. ROJECT NEED: D complete transmission main replacement from Palomar Airport Road to losp Way and Pressure Reducing Station at Faraday Avenue. INANCING: PurDose Estimated Cost Fundina Source Design $50,000 Construction $610,000 Water Replacement Water Replacement Total Cost = $660,000 ECRTRANS Page 143 CAPITAL PROJECT DESCRIPTION WATER DISTRIBUTION SYSTEM - EL FUERTE (NORTH OF LOKER) PROJECT NAME PROJECT NO. NONE PROJECT LOCATION MAP: PROJECT LOCATION: El Fuerte Avenue between Loker north to future Faraday Avenue. PROJECT DESCRIPTION: nstall2,300 LF of 16-inch line. :In 700-550 H.G. Zone). WOJECT NEED: To meet the future demands of the area. Developer to pay 75% of the cost. Purpose Estimated Cost DesignIConstruction DesignlConstruction $446,250 * $148,750 Total Cost = $595,000 Developer cost not shown in CIP schedules. Fundinq Source Water Connection Fee Other - Developer ELFUERT5 Page 144 CAPITAL PROJECT DESCRIPTION PROJECT LOCATION MAP s; PROJECT SITE ~ PROJECT LOCATION: Future El Fuerte from Alga Road to Poinsettia Lane. PROJECT DESCRIPTION: Install 5,050 LF of 30-inch line and a pressure regulating station. :In 700 H.G. Zone). 'ROJECT NEED: TO meet the future demands of the area. :INANCING: PurDose Estimated Cost DesignIConstruction $2,000,000 Total Cost = $2,000,000 Fundina Source Water Connection Fee ELFUERTE Page 145 CAPITAL PROJECT DESCRIPTION WATER DISTRIBUTION SYSTEM - EL FUERTE (FARADAY TO MAERKLE RESERVOIR) NONE PROJECT NO. PROJECT NAME 'ROJECT LOCATION MAP: ELFUERT2 PROJECT LOCATION: In portion of El Fuerte and easement northwesterly to Maerkle. PROJECT DESCRIPTION: nstall8,800 LF of 16-inch and a pressure regulating station. :In 700 H.G. Zone). 'ROJECT NEED: To meet the future demands of the area. Developer to pay 75% of the cost. :INANCING: PurDose Estimated Cost Design/Construction Design/Construction $330,000 $990,000 * Total Cost = $1,320,000 Fundinq Source Water Connection Fee Other - Developer Developer cost not shown in CIP schedules. Page 146 CAPITAL PROJECT DESCRIPTION NONE WATER DISTRIBUTION SYSTEM - EL FUERTE (POINSElTIA LANE TO PALOMAR AIRPORT ROg PROJECT NAME PROJECT LOCATION MAP: - ELFUERT4 PROJECT LOCATION: Future El Fuerte from future Carrillo Way to Palomar Airport Road. PROJECT DESCRIPTION: Install 4,100 LF of 24-inch line. PROJECT NEED: To meet the future demands of the area. FINANCING: PurDose Estimated Cost Design/Construction $820,000 Total Cost = $820,000 Fundina Source Water Connection Fee Page 147 CAPITAL PROJECT DESCRIPTION NONE WATER DISTRIBUTION SYSTEM - FOUSSAT ROAD WELL ABANDONMENT PROJECT NO. PROJECT NAME I PROJECT LOCATION MAP: Foussat PROJECT LOCATION: Southeast corner of Foussat Road and Mission Avenue in Oceanside. WOJECT DESCRIPTION: 4bandon well per State standards, remove pumps, valves, concrete structures md general restoration of property. PROJECT NEED: The existing well and equipment are not usable and must be properly removed. FINANCING: Pumose Estimated Cost Fundina Source Design $40,000 Construction $110,000 Water Replacement Fund Water Replacement Fund Total Cost = $150,000 ~ Page 148 CAPITAL PROJECT DESCRIPTION WATER DISTRIBUTION SYSTEM - LAKE CALAVERA RESERVOIR IMPROVEMENTS PROJECT NO. 3821 1 PROJECT NAME 'ROJECT LOCATION MAP: \ A I\i ",' LAKE CALAVERA PROJECT LOCATION: Lake Calavera in the northeast quadrant of the City. PROJECT DESCRIPTION: Replace outlet tower valves and piping. Remove silt and other accumulated debris and re-grade reservoir bottom to increase storage capacity, improve hydraulic flows to the outlet pipe and to reduce future tule incursion into the open water portion of the reservoir. PROJECT NEED: The existing valves located within the outlet tower have failed and water is presently draining from the reservoir and cannot be stopped. Left unrepaired, the lake will completely dty up. Since the reservoir must be drained to effect the repair, staff believes it would also be a good opportunity to remove the accumulated silt and debris. This would help pave the way for future use of the reservoir for recycled water storage by reducing tule incursions, improving the habitat values, improving hydraulic flow to the outlet pipes and improving water quality of the reservoir. FINANCING: Purvote Estimated Cost Fundina Source Planning/Study Design $50,000 Water Replacement Construction $100,000 $1,500,000 Water Replacement Water Replacement Total Cost = $1,650,000 PROJECT STATUS: Environmental Issues. Biological study ongoing. Lake-cal Page 149 CAPITAL PROJECT DESCRIPTION WATER DISTRIBUTION SYSTEM - MARRON ROAD (PRESSURE REGULATING STATION TO OCEANSIDE) PROJECT NO. NONE PROJECT NAME PROJECT LOCATION MAP: /RJECT I MARRONRD PROJECT LOCATION: Marron Road from Avenida de Anita easterly 5,450 feet. PROJECT DESCRIPTION: 'nStall5,450 LF of *Cinch line and two pressure regulating stations. Developel :o pay 50% of cost. PROJECT NEED: TO meet future demands in accordance with Growth Management Standards. :INANCING: Purvose Estimated Cost Fundina Source Design/Construction Design/Construction $604,000 $604,000 * Replacement Other - Developer Total Cost = $1,208,000 Developer cost not included in CIP schedules. Page 150 CAPITAL PROJECT DESCRIPTION NONE WATER DISTRIBUTION SYSTEM - MISCELLANEOUS PIPELINE REPLACEMENTS PROJECT NO. PROJECT NAME PROJECT LOCATION MAP: CITYWIDE WOJECT LOCATION: Jarious locations. WOJECT DESCRIPTION 3eplace existing small diameter and older pipelines at 21 locations. WOJECT NEED: The older pipelines do not supply sufficient water to meet current fire flow :onditions and to replace deteriorated pipelines. :INANCING: Purpose Estimated Cost Fundina Source Construction $1,400,000 Water Replacement Total Cost = $1,400,000 WTR-PIPE Page 151 CAPITAL PROJECT DESCRIPTION 38231 WATER DISTRIBUTION SYSTEM - MISCELLANEOUS STORAGE TANK REPAIRS PROJECT NO. PROJECT NAME 'ROJECT LOCATION MAP: VARIOUS LOCATIONS PROJECT LOCATION: At various existing storage tank locations. PROJECT DESCRIPTION: appurtenances. Install cathodic protection systems. Remove and replace deteriorated tank floor sections, ladders and PROJECT NEED Existing tanks have corrosion problems to rectify FINANCING: PurDose Estimated Cost Fundinq Source Construction Design $150,000 $20,000 Water Replacement Water Replacement Total Cost = $170,000 Misctank Page 152 CAPITAL PROJECT DESCRIPTION WATER DISTRIBUTION SYSTEM - MISCELLANEOUS WATER RESERVOIR FENCING PROJECT NO. 38221 PROJECT NAME PROJECT LOCATION MAP: Reselvoirs PROJECT LOCATION: At Various water reservoir locations throughout the City as shown on the ma, including the TAP, "C", "E", Santa Fe I1 and Calavera reservoirs. PROJECT DESCRIPTION: Install protective fencing around the identified reservoir sites for safety an, security purposes. PROJECT NEED: 'reject is required to protect the existing reservoir sites from vandalism and t( mure Safety of the public. Ongoing development in the City has made thest isolated reServOir Sites more accessible to the public thus intensifying thc leed for protective fencing. Purpose Estimated Cost Fundina Source Construction $110,000 Water Replacement Fund Total cost = $1 10,000 Page 153 CAPITAL PROJECT DESCRIPTION NONE WATER DISTRIBUTION SYSTEM - NORTH AGUA HEDIONDA TRANSMISSION MAIN PROJECT NO. PROJECT NAME PROJECT LOCATION MAP: 'ROJECT LOCATION: rlorth side of Agua Hedionda Lagoon from Via Hinton to Crestview Street. 'ROJECT DESCRIPTION: >onstruct 1 ,OOO feet of 8-inch diameter pipeline. 'ROJECT NEED: To provide a looping water pipeline in the service area to meet master plan equirements and increase system reliability. :INANCING: PurDose Estimated Cost Fundinq Source Design $30,000 Construction $100,000 Water Connection Water Connection Total Cost = $130,000 No-agua Page 154 CAPITAL PROJECT DESCRIPTION WATER DISTRIBUTION SYSTEM - OCEANSIDE INTERTIE UPGRADE PROJECT NAME PROJECT NO. 3531 1 PROJECT LOCATION MAP: PIMA CAMINO RML PROJECT LOCATION: El Camino Real near State Highway 78. PROJECT DESCRIPTION: Make improvements to increase reliability of water system intertie with City 01 3ceanside. System supplies 5 cfs of treated water to Carlsbad. During smergencies and periods of water supply curtailment, the Oceanside intertie Drovides backup. PROJECT NEED: The system requires valve, pipe, and meter replacement. FINANCING: Purpose Estimated Cost Fundina Source Design/Construction $100,000 Water Replacement Total Cost = $1 00,000 OSlDElNT ~~ Page 155 CAPITAL PROJECT DESCRIPTION WATER DISTRIBUTION SYSTEM - PALOMAR AIRPORT (NORTH OF OWENS) PROJECT NO. 34791 PROJECT NAME PROJECT LOCATION MAP: PROJECT LOCATION: In Palomar Airport from Owens Place to Airport Road. PROJECT DESCRIPTION: Install 625 LF of 12" line. PROJECT NEED: To meet the future demands of the airport area and two-way feed. FINANCING: Puroose Estimated Cost Fundina Source Design/Construction $150,000 Water Connection Fee Total Cost = $150,000 PALAIRPT Page 156 CAPITAL PROJECT DESCRIPTION WATER DISTRIBUTION SYSTEM - POINSElTIA LANE FROM “D RESERVOIR TO AMBROSIA LANE PROJECT NO. 36581 PROJECT NAME PROJECT LOCATION MAP: /PKOJtC I I POINS#lB ~ PROJECT LOCATION: Poinsettia Lane from “D” Reservoir east 2,800 feet to Ambrosia Lane. PROJECT DESCRIPTION: Install 2,800 LF of 12-inch line. PROJECT NEED: To meet the future demands of the area. Developer to pay 75% of the cost. FINANCING: Pumose Estimated Cost Fundina Source DesignKonstruction $322,000 Water Connection Fee Total Cost $322,000 Page 157 CAPITAL PROJECT DESCRIPTION WATER DISTRIBUTION SYSTEM - POINSETTIA LANUCASSIA ROAD JEL CAMINO REAL TO “D” RESERVOIR) PROJECT NAME PROJECT LOCATION MAP: POINSET2 PROJECT NO. 35851 PROJECT LOCATION: Poinsettia Lane from “D Reservoir to Cassia Road to El Camino Real. PROJECT DESCRIPTION: Install 5,550 LF of 30-inch line. :In 550 H.G. Zone). PROJECT NEED: TO meet the future demands of the area. Developer to pay 50% of the cost. ’INANCING: Purpose Estimated Cost Fundina Source DesignIConstruction $2,700,000 Water Connection Fee Total Cost = $2,700,000 Page 158 CAPITAL PROJECT DESCRIPTION NONE WATER DISTRIBUTION SYSTEM - POINSETTIA LANE (EL FUERTE TO EL CAMINO REAL) PROJECT NO. PROJECT NAME PROJECT LOCATION MAP: POINSET3 PROJECT LOCATION: Future Poinsettia Lane (from future El Fuerte to El Camino Real). PROJECT DESCRIPTION: Install 7,250 LF of 30-inch line and a pressure regulating station. :In 700-55-H.G Zones). WOJECT NEED: To meet the future demands of the area. :INANCING: PurDose Estimated Cost Fundina Source Design Construction $ 200,000 $2.600.000 Water Connection Water Connection Total Cost $2,600,000 Page 159 CAPITAL PROJECT DESCRIPTION 34421 WATER DISTRIBUTION SYSTEM - POINSElTIA LANE (PASEO DEL NORTE TO CARLSBAD BOULEVARD) PROJECT NO. PROJECT NAME WOJECT LOCATION MAP: PROJECT LOCATION: Poinsettia Lane from Paseo del Norte to Carlsbad Boulevard. PROJECT DESCRIPTION: Install 1,500 LF of 1 2-inch line. [In 318 H.G. Zone). PROJECT NEED: To meet the future demands of the area. xossing. FINANCING: Locate pipeline in new bridge Purpose Estimated Cost Design/Construction $375,000 Total Cost = $375,000 Fundina Source Water Connection Fee POINSLN2 Page 160 CAPITAL PROJECT DESCRIPTION NONE WATER DISTRIBUTION SYSTEM - PRESSURE REGULATING STATION (CANNON RD. & COLLEGE BLVD.) PROJECT NO. PROJECT NAME PROJECT LOCATION MAP: PROJECT LOCATION: -uture intersection of Cannon Road and College Boulevard. PROJECT DESCRIPTION: nstall pressure regulating station. ?aecial Note: This project will take place when the existing Cannon - Reservoir is taken out of service. :In 490-392 H.G. Zones). 'ROJECT NEED: To meet the future demands of the area. =INANCING: PurDose Estimated Cost Design/Construction $250,000 Total Cost = a50,ooo Fundlna Source Water Connection Fee PRESSREG Page 161 CAPITAL PROJECT DESCRIPTION 35491 WATER DISTRIBUTION SYSTEM - SEAWATER DESALINATION PROGRAMS PROJECT NO. PROJECT NAME WOJECT LOCATION MAP: NIA PROJECT LOCATION: Vot Applicable. PROJECT DESCRIPTION: Preparation of a report investigating various methods of treating City owned groundwater located in the San Luis aquifer in Oceanside and identifying :onveyance methods to transport the treated water to Carlsbad. Also included s a study of the feasibility of constructing a seawater desalination plant and dentifying potential sites upon which to construct a desalination plant. PROJECT NEED To develop supplemental source of water. FINANCING: PurDose Estimated Cost Fundina Source Planning Study $649,860 Water Replacement Total Cost = $649,860 IESALINA Page 162 CAPITAL PROJECT DESCRIPTION PROJECT LOCATION MAP: PROJECT LOCATION: Intersection of Carlsbad Village Drive and El Camino Real. PROJECT DESCRIPTION: Replace vault, piping and valves of existing pressure reducing station. PROJECT NEED: The existing pressure reducing station is to be replaced due to deteriorated condition of vault, valve and piping. FINANCING: Purpose Estimated Cost Fundinq Source Design Construction Total Cost = $120,000 $20,000 Water Replacement Fund $100,000 Water Replacement Fund Tangle Page 163 CAPITAL PROJECT DESCRIPTION WATER DISTRIBUTION SYSTEM - TAP NO. 2 RESERVOIR - PROJECT NAME PROJECT LOCATION MAP: PROJECT NO. 381 91 JROJECT LOCATION: -ocated adjacent to TAP No. 1 Reservoir west of the future College Boulevard iorth of Carlsbad Wage Drive within Calavera Hills. PROJECT DESCRIPTION: r\cquisition of a project site and construction of a 3.0 million gallon Watel storage reservoir. PROJECT NEED This is a Master Plan facility required to meet day-to-day Operational watel storage needs. Initial funds are needed to purchase the needed site prior tc levelopment of the surrounding property by the Calavera Hills Master Plan leveloper. Construction of the reservoir facility is required due to the levelopment of the surrounding area. PurDose Estimated Cost Fundina Source Land Acquisition $150,000 Water Connection Fund Design Construction $1,500,000 Water Connection Fund $100,000 Water Connection Fund Total Cost = $1,750,000 TAP#2 Page 164 CAPITAL PROJECT DESCRIPTION WATER DISTRIBUTION SYSTEM - TAP RESERVOIR EXTERIOR PAINTING PROJECT NAME PROJECT LOCATION MAP: PROJECT NO. 38531 PROJECT LOCATION: Northwest corner of Carlsbad Village Drive at College Boulevard. PROJECT DESCRIPTION: Repaint the exterior of TAP Reservoir. PROJECT NEED The existing paint has deteriorated and requires repainting prior to new homes Deing constructed. Also will include anti-graffiti coating. FINANCING: Purpose Estimated Cost Fundina Source Design Construction $5,000 Water Replacement $115,000 Water Replacement Total Cost = $120,000 Ext-pnt Page 165 CAPITAL PROJECT DESCRIPTION 35301 WATER DISTRIBUTION SYSTEM - TRI-AGENCY PIPELINE EROSION PROTECTION PROJECT NO. PROJECT NAME TRIAGNCY ?ROJECT LOCATION South of Calaveras Lake from City limits west to College Boulevard. ?ROJECT DESCRIPTION: The tri-agency pipeline is the major transmission main to the north portion oi ,he City. At several locations, flood waters and stream crossings have eroded :he soil cover above the pipeline exposing the pipeline to potential damage. The access road is also damaged precluding access by maintenance lersonnel. PROJECT NEED: To protect the pipeline from damage and provide access for maintenance mrsonnel. FINANCING: Purnose Estimated Cost Fundina Source Construction $150,000 Water Replacement Total Cost 3 $150,000 Page 166 CAPITAL PROJECT DESCRIPTION NONE WATER DISTRIBUTION SYSTEM - WATER CERTIFICATE OF PARTICIPATION (COP) PAYMENTS PROJECT NO. PROJECT NAME ~~ PROJECT LOCATION MAP: NIA 'ROJECT LOCATION: laries. 'ROJECT DESCRIPTION: 'ast Water District improvements. Cost includes bond financing and interest :ost. WOJECT NEED: 3equired to meet the Growth Management Standards and identified in the Mater Master Plan. :INANCING: Purpose Estimated Cost Fundina Source Debt Repayment $2,055,110 Debt Repayment Water Connection Fee $391,450 Water Replacement Total Cost = $2,446,560 ~ ~~ VATERCOP Page 167 CAPITAL PROJECT DESCRIPTION NONE WATER DISTRIBUTION SYSTEM -WATER OPERATIONS WATER PUMP PROJECT PROJECT NO. PROJECT NAME I PROJECT LOCATION MAP: Waterpmp WOJECT LOCATION: 3lery Pump Station - Janis Way. WOJECT DESCRIPTION: The Water District's Ellery Pump Station is designed to maintain adequate flow juring fire demands and boost pressure in the event of a significant drop in lressure or increase in demand. The pump station operates from a motor :ontrol center that has a service life in excess of twenty years. The scope oi his project is the replacement of the pump station's motor control center. WOJECT NEED: The motor control center for the Ellery Pump Station has over twenty years 01 service life. Its design is outdated, major components are obsolete and, as a ssult, repairs may not be possible. Replacement of the motor control centel Mill ensure reliability, efficiency, availability of parts and the ability to pul naintenance in a safe and timely manner. 'INANCING: Purpose Estimated Cost Fundinq Source Construction $55,000 Water Replacement Total cost = $55,000 XQA Status = Future CEQA required Page 168 CAPITAL PROJECT DESCRIPTION WATER DISTRIBUTION SYSTEM - WATER SYSTEM INTERTIE CONNECTION PROJECT NAME PROJECT LOCATION MAP: I WTRINTER PROJECT NO. 36641 PROJECT LOCATION: VID - Business Park Drive Vallecitos Water District Olivenhain Water District San Dieguito Water District PROJECT DESCRIPTION: :onstruct pipeline system intertie with adjacent water agencies includin! tista Irrigation District, Vallecitos Water District, Olivenhain Water District, anc ;an Dieguito Water District, 'ROJECT NEED: hing emergencies, these interties could supply water to the City and alsc xovide water back to the adjacent agencies. :INANCING: PurDose Estimated Cost Fundina Source Design/Construction $400,000 Water Replacement Total Cost = $4oo,OOo Page 169 CAPITAL PROJECT DESCRIPTION WATER DISTRIBUTION SYS' Dan I PROJECT LOCATION MAP: LOCATIONS THROUGHOUT THE CITY - MASTER PLAN UPDATE JAhAF 38701 & 38702 PROJECT NO. 'ROJECT LOCATION: "hroughout the City. Jpdate the Civs Water, Master Plans based on current growth projections and )btain necessary CEQA approval through the completion of an EIR for adoption by City Council. WOJECT NEED: The Master Plan update will help identify the need for changes to planned daster Plan was last updated in 1997. Since 1997, there have been several acilities based on the timing of growth projections. The Civs Water :hanges to the City's growth patterns due to the HMP and HCP that impact Jrowth projections and densities in various areas of the City. The Master Plan s necessary for identifying the facilities needed to meet Growth Management Standards. In addition, the current Master Plan has not been CEQA approved md, therefore, not adopted by Council. =INANCING: Estimated Cost $124,580 $31,145 Total Cost = $155,725' 'roject requires additional CEQA processing. Fundlna Source Water Connection Fee Water Replacement Mstmlan Page 170 RECYCLED WATER PROJECTS FUNDING MATRIX FOR RECYCLED WATER PROJECTS 38871 RECYCLED WATER PH II. PIPELINES 38881 RECYCLED WATER PH II - FLOW EQUALiZATION RECL WATER 2,970,000 RECL WATER 15,800,000 38891 RECYCLED WATER PH II - PUMP STATIONS 34871 PUMP STATION UPGRADE RECL WATER 2,M)O.wO RECL WATER (1) See Street Pmjeds - Poinsettia Lane Railmad Bridge Widening for details Page 171 CAPITAL PROJECT DESCRIPTION RECYCLED WATER PROJECTS - DEBT SERVICE ON STATE LOAN PROJECT NAME NONE PROJECT NO. I PROJECT LOCATION MAP: I NIA DEBTSERV 'ROJECT LOCATION: 4IA 'ROJECT DESCRIPTION: 3epayment of a low interest loan obtained through the State's Revolving Func o pay for the City's Phase I recycled water system. Total amount of the loan tc )e paid in equal installments over a 20-year period. 'ROJECT NEED: :he loan was required to fund the City's Phase I recycled water program. VNANCING: PurDose Estimated Cost Funding Source Loan Repayment $1,880.702 Recycled Water Total Cost = $1,880,702 CAPITAL PROJECT DESCRIPTION RECYCLED WATER - INDUSTRIAL PARK SYSTEM PROJECT NAME PROJECT LOCATION MAP: PROJECT NO. 34861 PROJECT LOCATION: Palomar Airport Road, Camino Vida Roble, El Camino Real. PROJECT DESCRIPTION: Develop recycled water system to College Business Park, Carlsbad Researcl :enter, Carlsbad Airport Center and Olympic Resort. PROJECT NEED: To supply recycled water for irrigation at existing industrial parks. =INANCING: Pumose Estimated Cost Fundina Source Construction Design $1,079,539 Recycled Water $100,000 Recycled Water Total Cost = $1,179,539 RCINDPRK Page 173 CAPITAL PROJECT DESCRIPTION 35861 RECYCLED WATER PROJECTS - 1-5 RECYCLED WATER TRANSMISSION LINE PROJECT NO. PROJECT NAME PROJECT LOCATION MAP: ? t, L PROJECT LOCATION: 1-5 Freeway from Palomar Airport Road to Carlsbad Village Drive. PROJECT DESCRIPTION: Caltrans installed a transmission main from Poinsettia Lane north tc Jefferson Street in 1996. The pipeline was oversized to supply recycled watet :o areas north of Tamarack Avenue. PROJECT NEED: To supply recycled water to Carlsbad north of Tamarack Avenue. =INANCING: PurDose Estimated Cost Fundina Source Design/Construction $140,000 Recycled Water Total Cost = $140,000 I5TRNSLN ~ Page 174 CAPITAL PROJECT DESCRIPTION 36751 RECYCLED WATER PROJECTS - RECYCLED WATER PROGRAM - PHASE II DESIGN REPORT PROJECT No. PROJECT NAME PROJECT LOCATION MAP: NIA PHASE11 'ROJECT LOCATION: ,t various locations throughout the Ci. 'ROJECT DESCRIPTION: 2onceptual design of the Phase I1 Recycled Water Program projects. The projects include construction of a 4.25 MGD tertiary water reclamation iant on property located south of the EWPCF, expansion of the Meadowlark NRP by an additional 1.0 MGD, conversion of the existing Mahr and Lake 3alavera Reservoirs to seasonal storage, conversion of Santa Fe I Reservoir :o diurnal storage, and construction of various transmission mains and pump stations. 'ROJECT NEED: b provide additional recycled water to meet Phase II demand requirements 01 1,480 acre-feet per year. Purpose Estimated Cost Fundinq Source Design $600,000 Recycled Water Page 175 CAPITAL PROJECT DESCRIPTION RECYCLED WATER - PHASE II TREATMENT FACILITY PROJECT NAME PROJECT LOCATION MAP: 36752 & 36753 PROJECT NO. 'ROJECT LOCATION: outh of Encina Water Pollution Control Facility (EWPCF). 'ROJECT DESCRIPTION: iesign and construction of the Phase II Recycled Water Treatment Facilities ear EWpCF on Avenida Encinas (4.0 mgd). This prOjed is one Of a Series Of rejects included in the Phase I1 Recycled Water Program as identified in the :ity's Recycled Water Master Plan. 'ROJECT NEED: b provide additional recycled water to meet Phase I1 demand requirements Of ,480 acre-feet per year. :INANCING: PurDose Estimated Cost Fundina Source Design $360,000 Recycled Water Construction $12,500,000 Recycled Water Construction $4,000,000 Water Replacement Total Cost = $16,860,000 Page 176 WOJECT LOCATION MAP: J PROJECT NO. 38871 PROJECT LOCATION: Palomar Airport industrial corridor and portion of northeast quadrant. PROJECT DESCRIPTION: Construction of approximately 120,126 feet of distribution pipelines ranging ir size from 4 inches to 24 inches in diameter, 3 pressure reducing stations anc :onnecting the Carlsbad Water Reclamation Facility with the Mahr Reservoir, PROJECT NEED: 3educe the use of potable water by providing reclaimed water for irrigation Jurposes. rINANCING: PurDose Estimated Cost Fundinq Source Total Cost = $15,800,000 Recycled Water Pipeline Page 177 CAPITAL PROJECT DESCRIPTION RECYCLED WATER - RECYCLED WATER PHASE II - FLOW EQUALIZATION PROJECT NAME I PROJECT LOCATION MAP: PROJECT NO. 38881 PROJECT LOCATION: Adjacent to the Carlsbad Water Reclamation Facility. PROJECT DESCRIPTION: 2onstruction of a water storage facility adjacent to the Encina WPCF for tht jual purpose of providing a clearwell for plant operations and a forebay, whict Mould allow the pumps to operate at a constant discharge rate or adjus lumping rates based on peak irrigation periods. WOJECT NEED: 3educe the use of potable water by providing reclaimed water for irrigatior Iurposes. =INANCING: PurDose Estimated Cost Fundinq Source Total Cost = $2,970,000 Recycled Water Flowequa ~ Page 178 CAPITAL PROJECT DESCRIPTION RECYCLED WATER - RECYCLED WATER PHASE II - PUMP STATIONS PROJECT NAME 'ROJECT LOCATION MAP: PROJECT NO. 38891 ~~~____~ 'ROJECT LOCATION: D" Tanks, Palomar Airport Road and El Carnino Real, and College Boulevard orth of Cannon Road. 'ROJECT DESCRIPTION: ;onstruction of pump stations to transport reclaimed water to the following ervice areas: I "D" Tank Pump Station (3841550 Zone) I Calavera Pump Station (550 Zone) I PARlECR Pump Station (660 Zone) 'ROJECT NEED: lurposes. o reduce the use of potable water by providing reclaimed water for irrigation :INANCING: PurDose Estimated Cost Fundinq Source Total Cost = $2,600,000 Recycled Water Page 179 CAPITAL PROJECT DESCRIPTION RECYCLED WATER - PUMP STATION UPGRADE PROJECT NAME PROJECT NO. 3487 1 WOJECT LOCATION MAP: PALOMAR AIRPORT 'ROJECT LOCATION: II Camino Real south of Palomar Airport Road. SROJECT DESCRIPTION: ixisting pumps are inefficient, pumps need to maintain level and onfoff control, wxmanent enclosure is needed to reduce vandalism and maintenance, and nstall landscaping to improve site aesthetics. WOJECT NEED: txisting pumps are inefficient, pumps need to maintain level rather than on/off :ontrol, permanent enclosure is needed to reduce vandalism and maintenance, md landscaping will improve site aesthetics. INANCING: Puroose Estimated Cost Fundina Source Design/Construction $400,000 Recycled Water Total Cost = $400,000 1CSTNUPG Page 180 CIRCULATION SYSTEM PROJECTS TRAFFIC SIGNAL PROJECTS FUNDING MATRIX FOR TRAFFIC SIGNAL PROJECTS Page 181 Page 182 CAPITAL PROJECT DESCRIPTION NONE CIRCULATION SYSTEM TRAFFIC SIGNALS - ALGA ROAD AND CAZADERO DRIVE PROJECT NO. PROJECT NAME I PROJECT LOCATION MAP: ALGACAZA PROJECT LOCATION: 4t the intersection of Alga Road and Cazadero Drive. PROJECT DESCRIPTION: Installation of a fully traffic actuated traffic signal with Type 170 controller an1 appurtenant striping and signing. PROJECT NEED: Saltrans signal warrants have been met. The intersection is listed on th, qualification list of the City's Traffic Signal Evaluation Policy. FINANCING: Puroose Estimated Cost Fundinq Source Design $5,000 Gas Tax Construction $145,000 Gas Tax Total Cost = $1 50,000 Page 183 CAPITAL PROJECT DESCRIPTION NONE CIRCULATION SYSTEM TRAFFIC SIGNALS -ALGA ROAD AND XANA WAY PROJECT NO. PROJECT NAME I PROJECT LOCATION MAP: Algaxana 'ROJECT LOCATION: it the intersection of Alga Road and Xana Way. 'ROJECT DESCRIPTION: nstallation of a 6-phase, fully actuated traffic signal, including a Type 170 :ontroller, 200 SA local intersection control program and appurtenant striping md signing. 'ROJECT NEED: Since a Caltrans traffic signal warrant has been met, the intersection has been ncluded on the Traffic Signal Qualification List, which is part of the Civs Traffic Signal Evaluation Policy. The installation of a traftic signal will increase the ;afety for both motorists and pedestrians entering and crossing Alga Road rom Xana Way, which are currently unmet needs. :INANCING: Purpose Estimated Cost Fundina Source Design Construction $10,000 $140,000 GCC GCC Total Cost = $150,000 bnual Operating Cost = $5,000 3EQAStatus: Statutorily or categorically exempt. Page 184 CAPITAL PROJECT DESCRIPTION 33691,33692 & 33693 CIRCULATION SYSTEM TRAFFIC SIGNALS - AVIARA PARKWAY (POINSETTIA LANE TO EL CAMINO REA9 PROJECT NO. PROJECT NAME 'ROJECT LOCATION MAP: \ -.- IN. WOJECT LOCATION: 4t various intersections on Aviara Parkway between Poinsettia Lane and II Camino Real. WOJECT DESCRIPTION: Zonstruct traffic signals and/or make minor drainage improvements to the 'ollowing intersections with Aviara Parkway: I. Poinsettia Lane - Minor Drainage Improvements 2. Nightshade Road - Traffic Signal 3. Kestrol Drive - Traffic Signal 1. Tohee Lane - Traffic Signal 5. Black Rail Road 5. Finch Lane - Traffic Signal WOJECT NEED: Signals needed to comply with Growth Management Standards. Traffic signals will be installed when they are warranted. Minor street improvements are ieeded to accommodate street drainage. Improvements will be constructed when Aviara Parkway is extended north of Poinsettia Lane. =INANCING: PurDose Estimated Cost Fundina Source Design/Construction $593,000 Design/Construction $30,000 Assessment District 88-01 Design/Construction $170,000 TIF GCC Total cost = $793,000 VlATSlG Page 185 CAPITAL PROJECT DESCRIPTION NONE CIRCULATION SYSTEM TRAFFIC SIGNALS - CALLE BARCELONA AND PASEO ALE0 PROJECT '0. PROJECT NAME 'ROJECT LOCATION MAP: P PROJECT LOCATION: Intersection of Calle Barcelona and Paseo Aliso. PROJECT DESCRIPTION: controller, 200 SA local intersection control program and appurtenant striping Installation of a 4-leg, fully actuated traffic signal, including a Type 170 and signing. PROJECT NEED: A Caltrans traffic signal warrant has been met. The intersection is listed on the Traffic Signal Qualification List of the Civs 2002 Traffic Signal Evaluation Policy. The installation of this traffic signal will assign the right-of-way for both motorists and pedestrians entering and crossing at this intersection. This is an elementary school pedestrian crossing. FINANCING: Purpose Estimated Cost Fundinq Source Construction $150,000 GCC Total Cost = $150,000 Annual Operating Cost = $5,000 CEQA Status = Exempt Callepas Page 186 CAPITAL PROJECT DESCRIPTION CIRCULATION SYSTEM TRAFFIC SIGNALS - CALLE BARCELONAAND PASEO AVELLANO PROJECT NO. NONE PROJECT NAME I PROJECT LOCATION MAP: Callebarc PROJECT LOCATION: Intersection of Calk Barcelona and Paseo Avellano. PROJECT DESCRIPTION: Installation of a 4-leg, fully actuated traffic signal, including a Type 17C controller, 200 SA local intersection control program and appurtenant stripin( and signing. PROJECT NEED: A Caltrans traffic signal warrant has been met. The intersection is listed on thr Traffic Signal Qualification List of the City’s 2002 Traffic Signal Evaluatior Policy. The installation of this traffic signal will assign the right-of-way for boti- motorists and pedestrians entering and crossing at this intersection. FINANCING: Pumose Estimated Cost Fundina Source Construction $150,000 GCC Total Cost = $150,000 4nnual Operating Cost = $5,000 ZEQA Status = Exempt ~___ Page 187 CAPITAL PROJECT DESCRIPTION NONE CIRCULATION SYSTEM TRAFFIC SIGNALS - CAMINO DE LOS COCHES AND LA COSTA AVENUE PROJECT NO. PROJECT NAME ’ROJECT LOCATION MAP: ’ROJECT LOCATION: ntersection of Camino de 10s Coches and La Costa Avenue. ’ROJECT DESCRIPTION: nstallation of a 4-phase, fully actuated traffic signal, including a Type 170 antroller and 176 intersection control program. ’ROJECT NEED: Jeeded to comply with Growth Management Standards. Installation will occur then traffic signal warrants are met. VNANCING: Purmse Estimated Cost Fundina Source Design/Construction $150,000 PFF Total Cost = $150,000 CAMINODE Page 188 CAPITAL PROJECT DESCRIPTION NONE CIRCULATION SYSTEM TRAFFIC SIGNALS - CAMINO VlDA ROBLE AND YARROW DRIVE PROJECT NO. PROJECT NAME PROJECT LOCATION MAP: LOCATION f PROJECT LOCATION: Intersection of Camino Vida Roble and Yarrow Drive, PROJECT DESCRIPTION: controller, 176 intersection control program, minor intersection improvements Installation of a 2-phase, fully actuated traffic signal, including a Type 17C signing and striping. PROJECT NEED: Needed to comply with Growth Management Standards and traffic signa warrants. Installation will occur when traffic signal warrants are met. FINANCING: Pumose Estimated Cost Fundinq Source Design/Construction $125,0000 PFF Total Cost = $125,000 CAMINOYA Page 189 CAPITAL PROJECT DESCRIPTION NONE CIRCULATION SYSTEM TRAFFIC SIGNALS - CANNON ROAD AND COLLEGE BOULEVARD PROJECT NO. PROJECT NAME 'ROJECT LOCATION MAP: ! I 'ROJECT LOCATION: ntersection of Cannon Road and College Boulevard. 'ROJECT DESCRIPTION: nstallation of an 8-phase, fully actuated traffic signal, including a Type 170 :ontroller and 176 intersection control program. 'ROJECT NEED: deeded to comply with Growth Management Standards. Installation will occur vhen traffic signal warrants are met. 3NANCING: Purpose Estimated Cost Fundina Source Design/Construction $1 50,000 PFF Total Cost = $150,000 :ANNON2 Page 191 CAPITAL PROJECT DESCRIPTION NONE CIRCULATION SYSTEM TRAFFIC SIGNALS - CARLSBAD BOULEVARD AND AVENIDA ENCINAS PROJECT NO. PROJECT NAME I PROJECT LOCATION MAP: CBADAVEN ROJECT LOCATION: ltersection of Carlsbad Boulevard and Avenida Encinas. 'ROJECT DESCRIPTION: lstallation of a 4-phase, fully actuated traffic signal, including a Type 170 ontroller and 176 intersection control program. Replacement for existing ouble signals when Carlsbad Boulevard is realigned. 'ROJECT NEED: leeded to comply with Growth Management Standards. Installation to OCCUr !hen Carlsbad Boulevard is realigned. :INANCING: Purpose Estimated Cost Fundina Source Design/Construction $110,000 PFF Total Cost = $11 0,000 Page 192 CAPITAL PROJECT DESCRIPTION CIRCULATION SYSTEM TRAFFIC SIGNALS - CARLSBAD BOULEVARD AND CHERRY AVENUE PROJECT NO. 38461 PROJECT NAME PROJECT LOCATION MAP: PACIFIC OCEAN 'ROJECT LOCATION: ntersection of Carlsbad Boulevard and Cherry Avenue. 'ROJECT DESCRIPTION: nstallatiin of a 4-phase, fully actuated traffic signal, including a Type 170 :ontroller, 200 SA local intersection control program and appurtenant striping md signing. 'ROJECT NEED: :altrans traffic signal warrants have been met. The intersection is listed on the lualification list of the City's Traffic Signal Evaluation Policy. :INANCING: Purpose Estimated Cost Fundina Source Design $10,000 GCC Construction $115,000 GCC Total Cost = $125,000 CBCheny Page 193 CAPITAL PROJECT DESCRIPTION ~ ~ NONE CIRCULATION SYSTEM TRAFFIC SIGNALS - CARLSBAD BOULEVARD AND OAK AVENUE NO. PROJECT NAME ’ROJECT LOCATION MAP: ~ ~~~ %OJECT LOCATION: 4t the intersection of Carlsbad Boulevard and Oak Avenue. WOJECT DESCRIPTION: nstallation of a fully traffic actuated traffic signal with Type 170 controller and appurtenant striping and signing. WOJECT NEED: 3altrans signal warrants have been met. The intersection is listed on the qualification list of the City’s Traffic Signal Evaluation Policy. =INANCING: PurDose Estimated Cost Fundina Source Design $5,000 Construction Total Cost = $150,000 Gas Tax $145,000 Gas Tax BLVDOAK Page 194 CAPITAL PROJECT DESCRIPTION NONE CIRCULATION SYSTEM TRAFFIC SIGNALS - CARLSBAD BOULEVARD AND STATE STREET PROJECT NO. PROJECT NAME I PROJECT LOCATION MAP PROJECT LOCATION: At the intersection of Carlsbad Boulevard and State Street. PROJECT DESCRIPTION: 'nStallatiOn of a fully traffic actuated traffic signal with Type 170 controller an, 3ppurtenant striping and signing. 'ROJECT NEED: %trans Signal warrants have been met. The intersection is listed on th, lualification list of the City's Traffic Signal Evaluation Policy. :INANCING: Pumose Estimated Cost Fundinq Source Construction Design $5,000 $145,000 Gas Tax Gas Tax Total Cost = $150,000 CB-STATE Page 195 CAPITAL PROJECT DESCRIPTION NONE CIRCULATION SYSTEM TRAFFIC SIGNALS - CARLSBAD VILLAGE DRIVE AND CHATHAM ROAD PROJECT No. PROJECT NAME WOJECT LOCATION MAP: PROJECT LOCATION: Intersection of Carlsbad Village Drive and Chatham Road. PROJECT DESCRIPTION: Installation of a 4-leg, fully actuated traffic signal, including a Type 170 controller, 200 SA local intersection control program and appurtenant striping and signing. PROJECT NEED: A Caltrans traffic signal warrant has been met. The intersection is listed on the Traffic Signal Qualification List of the City's 2002 Traffic Signal Evaluation Policy. The installation of this traffic signal will assign the right-of-way for both motorists and pedestrians entering and crossing at this intersection. FINANCING: PurDose Estimated Cost Fundina Source Construction $150,000 GCC Total cost = $150,000 Annual Operating Cost = $5,000 CEQA Status = Exempt XDchath __~ Page 196 CAPITAL PROJECT DESCRIPTION NONE CIRCULATION SYSTEM TRAFFIC SIGNALS - CARLSBAD VILLAGE DRIVE AND AVENIDA DE ANITA PROJECT NO. PROJECT NAME 'ROJECT LOCATION MAP: WOJECT LOCATION: It the intersection of Carlsbad Village Drive and Avenida De Anita. 'ROJECT DESCRIPTION: appurtenant striping and signing. The traffic signal is a requirement of the nstallation of a fully traffic actuated traffic signal with Type 170 controller and adjacent development project. The budgeted amount represents the City's ?stirnated contribution. WOJECT NEED: :altrans signal warrants have been met. The intersection is listed on the qualification list of the City's Traffic Signal Evaluation Policy In addition, the Iroperty to the south of the intersection is approved for a residential jevelopment which will add a fourth leg to the intersection. The development is :onditioned to pay for one quarter of the traffic signal work. No development schedule has been submitted, however, the project tentative map will expire his year with a potential for two more years worth of extensions. :INANCING: PurDose Estimated Cost Fundins Source Construction $80,000 Gas Tax Total Cost = $80,000 :VDAVENI Page 197 CAPITAL PROJECT DESCRIPTION 38471 CIRCULATION SYSTEM TRAFFIC SIGNALS - CARLSBAD VILLAGE DRIVE AND PONTIAC DRIVE PROJECT NO. PROJECT NAME PROJECT LOCATION MAP: 'ROJECT LOCATION: ntersection of Carlsbad Village Drive and Pontiac Drive. 'ROJECT DESCRIPTION: nstallation of a 4-phase, fully actuated traffic signal including a Type 17C :ontroller, 200 SA local intersection control program and appurtenant striping knd signing. 'ROJECT NEED: :altrans traffic signal warrants have been met. The intersection is listed on the lualification list of the Civs Traffic Signal Evaluation Policy. :INANCING: PurDose Estimated Cost Fundinq Source Construction Design $10,000 $148,550 GCC GCC Total Cost = $158,550 CVDgont Page 198 CAPITAL PROJECT DESCRIPTION CIRCULATION SYSTEM TRAFFIC SIGNALS - CARLSBAD VILLAGE DRIVE SIGNAL RE-TIMING PROJECT NO. NONE PROJECT NAME PROJECT LOCATION MAP: LEGEND: PROPOSED INTERSECTIONS TO BE STUDIED PROJECT LOCATION: Existing traffic signals on Carlsbad Village Drive at State Street, Roosevel Street, Madison Street, Jefferson Street and Harding Street (5 locations). PROJECT DESCRIPTION: Re-timing of traffic signals including field inventory, traffic counts anc preparation of signal timing plans. PROJECT NEED: This will be a CMAQ funded project. As such, local agencies are required to spend required monies and apply for federal reimbursement. FINANCING: PurDose Estimated Cost Fundinq Source Design $12,100 Gas Tax Total Cost = $12,100 CVD-sgnl Page 199 CAPITAL PROJECT DESCRIPTION NONE CIRCULATION SYSTEM TRAFFIC SIGNALS - COLLEGE BOULEVARD AND EL CAMINO REAL PROJECT NO. PROJECT NAME PROJECT LOCATION MAP: WOJECT LOCATION: ntersection at College Boulevard and El Camino Real. 'ROJECT DESCRIPTION: :ontroller and a Type 176 intersection control program. nstallation of an 8-phase, fully actuated traffic signal including a Type 170 WOJECT NEED: Jeeded to meet Growth Management Standards. :INANCING: PurDose Estimated Cost Fundina Source Design/Construction $115,000 PFF Total Cost = $115,000 COLL-ECR ~ ~~ Page 200 CAPITAL PROJECT DESCRIPTION NONE CIRCULATION SYSTEM TRAFFIC SIGNALS - COLLEGE BOULEVARD AND CARLSBAD VILLAGE DRIVE PROJECT NO. PROJECT NAME WOJECT LOCATION MAP ~~~~~ WOJECT LOCATION: ntersection of College Boulevard and Carlsbad Village Drive. WOJECT DESCRIPTION: :ontroller and 176 intersection control program. nstallation of an %phase, fully actuated traffic signal, including a Type 170 WOJECT NEED: Ueeded to comply with Growth Management Standards. Installation will occur Nhen traffic signal warrants are met. 'INANCING: Purpose Estimated Cost Fundina Source Design/Construction $1 10,000 PFF Total Cost = $110,000 COL-CVD Page 201 CAPITAL PROJECT DESCRIPTION CIRCULATION SYSTEM TRAFFIC SIGNALS - COLLEGE BOULEVARD AND TAMARACK AVENUE (S) PROJECT NO. NONE {LAKE CALAVERA ENTRANCE) PROJECT NAME PROJECT LOCATION MAP: . \ LAKE 7' CALAVERA \ P- PROJECT LOCATION: Intersection of College Boulevard and Lake Calavera entrance. PROJECT DESCRIPTION: Installation of a 4-phase, fully actuated traffic signal, including a Type 17C controller and 176 intersection control program. PROJECT NEED: Needed to comply with Growth Management Standards and traffic signal rvarrants. FINANCING: Purpose Estimated Cost Fundinq Source Design/Construction $100,000 PFF Total Cost = $100,000 COLLKCAL Page 202 CAPITAL PROJECT DESCRIPTION 38621 CIRCULATION SYSTEM TRAFFIC SIGNALS - COLLEGE BOULEVARD AND TAMARACK AVENUE (N) PROJECT NO. PROJECT NAME 'ROJECT LOCATION MAP: 'ROJECT LOCATION: itersection of College Boulevard and Tamarack Avenue (N). WOJECT DESCRIPTION: istallation of an 6-phase, fully actuated traffic signal, including a Type 170 :ontroller, 200 SA local intersection control program and appurtenant striping md signing. 'ROJECT NEED: \n elementary school is scheduled to be constructed within the next year on Bmarack Avenue east of College Boulevard. In addition, at some time in the uture, College Boulevard will be opened to the north to the City of Oceanside, vhich will be a direct connection to the Highway 78 corridor. A traffic signal will leed to be in operation at this intersection at this time. YNANCING: PurDose Estimated Cost Fundina Source Design $10,000 GCC Construction $140,000 GCC Total Cost = $150,000 \nnual Operating Cost = $5,000 :EQA Status: Statutorily or categorically exempt. Coltam Page 203 CAPITAL PROJECT DESCRIPTION CIRCULATION SYSTEM TRAFFIC SIGNALS - EL CAMINO REAL TRAFFIC SIGNAL REHABILITATION PROJECT NO. NONE PROJECT NAME PROJECT LOCATION MAP: 1 - SIGNAL LOCATION - PROJECT LOCATION: Signalized intersections of El Camino Real and Plaza Drive, El Camino Re; and Marron Road, and El Camino Real and Hosp Way. PROJECT DESCRIPTION: Design and rebuild existing signalized intersections to include all sign; appurtenances and to meet ADA requirements. Repair concrete and rebuild i portion of Marron Road east of El Camino Real. PROJECT NEED: Underground signal facilities at this location have deteriorated to the poin #here conductors can no longer be pulled through the system. This project wi reduce the need for future maintenance and restore the ability for maintenancl crews to make future repairs should equipment become damaged o malfunction. Pull boxes and signal poles require location for installation of ADI pedestrian ramps. Replacing a cross-gutter in Marron Road will improve thl driving conditions. FINANCING: Purpose Estimated Cost Fundina Source Design Construction $70,000 $1,130,000 Total Cost = $1,200,000 CEQA Status = Exempt IM&R IM&R ~~ ECRrehab Page 204 CAPITAL PROJECT DESCRIPTION 38001 CIRCULATION SYSTEM TRAFFIC SIGNALS - EL CAMINO REAL AND POINSETTIA LANE PROJECT NO. PROJECT NAME I PROJECT LOCATION MAP: PROJECT LOCATION: Intersection of El Camino Real and Poinsettia Lane. PROJECT DESCRIPTION: Installation of an &phase, fully actuated traffic signal, including a Type 17( sontroller and 176 intersection control program. PROJECT NEED: Needed to comply with Growth Management Standards. FINANCING: PurDose Estimated Cost Fundina Source Design Construction Total cost = $204,250 $5,000 PFF $199,250 PFF ECR3 Page 205 CAPITAL PROJECT DESCRIPTION 38451 CIRCULATION SYSTEM TRAFFIC SIGNALS - EL CAMINO REAL CORRIDOR STUDY PROJECT NO. PROJECT NAME PROJECT LOCATION MAP: WOJECT LOCATION: Uong El Camino Real from SR78 to Marron Road, WOJECT DESCRIPTION: rhis project will study and analyze the existing traffic patterns along El Camino 3eal in the proximity of State Highway 78 to determine what, if any, potential tctions can be taken to reduce existing traffic congestion levels. WOJECT NEED The project is needed to help mitigate traffic congestion on El Camino Real. YNANCING: PurDose Estimated Cost Fundina Source Study/Report $29,000 GCC Total Cost = $29,000 Ecrcorr Page 206 CAPITAL PROJECT DESCRIPTION -~ ~~ ~ -~ 36461 PROJECT NO. CIRCULATION SYSTEM TRAFFIC SIGNALS - FARADAY AVENUE AND CANNON ROAD PROJECT NAME ’ROJECT LOCATION MAP SIGNAL \ L LOCATION ~~ ~ ’ROJECT LOCATION: itersection of Cannon Road and Faraday Avenue. ’ROJECT DESCRIPTION: Istallation of a 4-phase, fully actuated traffic signal, including a Type 170 :ontroller and 176 intersection control program. Project will be constructed as )art of the Faraday Avenue Extension street project. See the Faraday Avenue ixtension street project Technical Appendix sheet for full comprehensive lroject funding. ’ROJECT NEED: deeded to comply with Growth Management Standards. Installation will occur vhen traffic signal warrants are met. :INANCING: PurDose Estimated Cost Fundina Source Design/Construction $125,000 PFF Total Cost = $125,000 CANNONTS Page 207 CAPITAL PROJECT DESCRIPTION NONE CIRCULATION SYSTEM TRAFFIC SIGNALS - FARADAY AVENUE AND CAMINO HILLS DRIVE PROJECT NO. PROJECT NAME I PROJECT LOCATION MAP: Faraday 'ROJECT LOCATION: ntersection of Faraday Avenue and Camino Hills Drive. WOJECT DESCRIPTION: :ontroller, 200 SA local intersection control program and appurtenant striping nstallation of a 3-leg, fully actuated traffic signal, including a Type 17C md signing. WOJECT NEED: 4 Caltrans traffic signal warrant has been met. The intersection is listed on the rraffic Signal Qualification List of the City's 2002 Traffic Signal Evaluatior Jolicy. The installation of this traffic signal will assign the right-of-way for bott notorists and pedestrians entering and crossing at this intersection. :INANCING: Purpose Estimated Cost Fundina Source Construction $125,000 GCC Total Cost = $125,000 Innual Operating Cost = $5,000 Page 208 CAPITAL PROJECT DESCRIPTION NONE CIRCULATION SYSTEM TRAFFIC SIGNALS - FARADAY AVENUE AND ORION STREET PROJECT NO. PROJECT NAME I PROJECT LOCATION MAP: FARAORIO 'ROJECT LOCATION: it the intersection of the above named streets. 'ROJECT DESCRIPTION: lstall a 4-phase fully actuated traffic signal including a Type 170 controller anc Lpe 176 intersection control program. 'ROJECT NEED: leeded to comply with Growth Management Standards. TNANCING: PurDose Estimated Cost Funding Source DesignlConstruction $150,000 TIF Total Cost = $150,000 Page 209 CAPITAL PROJECT DESCRIPTION 36211 CIRCULATION SYSTEM TRAFFIC SIGNALS - FARADAY AVENUE AND PRIESTLY DRIVE PROJECT NO. PROJECT NAME I PROJECT LOCATION MAP: 'ROJECT LOCATION: \t the intersection of Faraday Avenue and Priestly Drive. 'ROJECT DESCRIPTION: nstallation of a fully traffic actuated traffic signal with Type 170 controller and rppurtenant striping and signing. 'ROJECT NEED: :altrans signal warrants have been met. The intersection is listed on the qualification list of the City's Traffic Signal Evaluation Policy. :INANCING: Purpose Estimated Cost Fundina Source Design $5,000 Gas Tax Construction $145,000 Gas Tax Total Cost = $150,000 Page 210 CAPITAL PROJECT DESCRIPTION NONE CIRCULATION SYSTEM TRAFFIC SIGNALS - FARADAY AVENUE AND RUTHERFORD ROAD PROJECT NO. PROJECT NAME I PROJECT LOCATION MAP: PROJECT LOCATION: 4t the intersection of Faraday Avenue and Rutherford Road. PROJECT DESCRIPTION: Installation of an 8-phase, fully actuated traffic signal, including a Type 17C :ontroller, 200 SA local intersection control program and appurtenant striping md signing. PROJECT NEED: >altrans traffic signal warrants have been met. The intersection is listed on the qualification list of the Citfs Traffic Signal Evaluation Policy. =INANCING: Purpose Estimated Cost Fundina Source Design $1 0,000 GCC Construction $140,000 GCC Total Cost = $150,000 Faruthfd Page 211 CAPITAL PROJECT DESCRIPTION NONE CIRCULATION SYSTEM TRAFFIC SIGNALS - LA COSTA AVENUE AND CALLE MADERO PROJECT '0. PROJECT NAME ROJECT LOCATION MAP: .acosta 'ROJECT LOCATION: ltersection of La Costa Avenue and Calle Madero. 'ROJECT DESCRIPTION: wtallation of a 3-leg, fully actuated traffic signal, including a Type 170 ontroller, 200 SA local intersection control program and appurtenant striping md signing. 'ROJECT NEED: \ Caltrans traffic signal warrant has been met. The intersection is listed on the 'raffic Signal Qualification List of the City's 2002 Traffic Signal Evaluation 'olicy. The installation of this traffic signal will assign the right-of-way for both notorists and pedestrians entering and crossing at this intersection. PurDose Estimated Cost Fundinq Source Construction $125,000 GCC Totel Cost = $125,000 4nnual Operating Cost = $5,000 Page 212 CAPITAL PROJECT DESCRIPTION NONE CIRCULATION SYSTEM TRAFFIC SIGNALS - LA COSTA AVENUE AND NUEVA CASTILLA WAY PROJECT NO. PROJECT NAME 'ROJECT LOCATION MAP: 'ROJECT LOCATION: ntersection of La Costa Avenue and Nueva Castilla Way. 'ROJECT DESCRIPTION: nstallation of a 4-phase, fully actuated traffic signal including a Type 170 :ontroller, 200 SA local intersection control program and appurtenant striping md signing. 'ROJECT NEED: :altrans traffic signal warrants have been met. The intersection is listed on the lualification list of the Civs Traffic Signal Evaluation Policy. :INANCING: Pumose Estimated Cost Fundina Source Design $10,000 GCC Construction $1 15,000 GCC Total Cost = $125,000 LCANueva Page 213 CAPITAL PROJECT DESCRIPTION CIRCULATION SYSTEM TRAFFIC SIGNAL5 DDn NONE iLROSE DRIVE AND LA COSTA AVENUE PROJECT No. 'ROJECT LOCATION: ltersection of Melrose Drive and La Costa Avenue. 'ROJECT DESCRIPTION: istallation of a 4-phase, fully actuated traffic signal, including a Type 17C ontroller and 176 intersection control program. IROJECT NEED: leeded to comply with Growth Management Standards. :INANCING: PurDose Estimated Cost Fundincl Source DesignlConstruction $150,000 PFF Total Cost = $150,000 MELROSE Page 214 CAPITAL PROJECT DESCRIPTION NONE CIRCULATION SYSTEM TRAFFIC SIGNALS - MONROE STREET AND HOSP WAY PROJECT NO. PROJECT NAME I PROJECT LOCATION MAP: I LOCATION SIGNAL Monroe WOJECT LOCATION: ntersection of Monroe Street and Hosp Way. WOJECT DESCRIPTION: :ontroller, 200 SA local intersection control program and appurtenant striping nstallation of a 4-leg, fully actuated traffic signal, including a Type 17C md signing. WOJECT NEED: 1 Caltrans traffic signal warrant has been met. The intersection is listed on the rraffic Signal Qualification List of the City's 2002 Traffic Signal Evaluatior 'olicy. The installation of this traffic signal will assign the right-of-way for both notorists and pedestrians entering and crossing at this intersection. =INANCING: PurDose Estimated Cost Fundinq Source Construction $150,000 GCC Total Cost = $1 50,000 4nnual Operating Cost = $5,000 Page 215 CAPITAL PROJECT DESCRIPTION 36441 CIRCULATION SYSTEM TRAFFIC SIGNALS - PALOMAR AIRPORT ROAD AND MELROSE DRIVE PROJECT NO. PROJECT NAME PROJECT LOCATION MAP: Y WOJECT LOCATION: ntersection of Palomar Airport Road and Melrose Drive. WOJECT DESCRIPTION: :ontroller and 176 intersection control program. nstallation of an 8-phase, fully actuated traffic signal, including a Type 170 'ROJECT NEED: qeeded to comply with Growth Management Standards. 'INANCING: PurDose Estimated Cost Fundina Source Design/Construction $250,000 PFF Total Cost = $250,000 'ARMELRO Page 216 CAPITAL PROJECT DESCRIPTION NONE CIRCULATION SYSTEM TRAFFIC SIGNALS - PASEO DEL NORTE AND CAR COUNTRY DRIVE No. PROJECT NAME I PROJECT LOCATION MAP: ~~ PDN-CCDR WOJECT LOCATION: it the intersection of Paseo Del Norte and Car Country Drive. WOJECT DESCRIPTION: ippurtenant striping and signing. nstallation of a fully traffic actuated traffic signal with Type 170 controller an( WOJECT NEED: :altrans signal warrants have been met. The intersection is listed on thc lualification list of the City's Traffic Signal Evaluation Policy. :INANCING: PurDose Estimated Cost Fundinq Source Design $5,000 Gas Tax Construction $120,000 Gas Tax Total Cost = $125,000 Page 217 CAPITAL PROJECT DESCRIPTION CIRCULATION SYSTEM TRAFFIC SIGNALS DFIA I PROJECT LOCATION MAP: PROJECT LOCATION: Intersection of Poinsettia Lane and Brigantine Road, PROJECT DESCRIPTION: Construction of a City Standard traffic signal. The money set aside for this project represents a prorated share of the traffic signal improvement a6 contributed by the Oceanbluff development. The remaining signal cost will be the responsibility of other adjacent development. Construction of the traffic signal will not occur until traffic signal warrants have been met. PROJECT NEED: Required to accommodate the safe and efficient flow of traffic from Brigantine Drive onto Poinsettia Lane which is classified as a major arterial in the City's Circulation Element. The need for the signal is created by the development oi adjacent properties. Early developing properties which do not trigger the :onstruction of the signal are required to contribute a fair share contribution oi the total cost to install the traffic signal. FINANCING: Pumose Estimated Cost Fundinq Source Construction $31,625 GCC' Total Cost = $31.625 'From developer exaction Poin-brig Page 218 CAPITAL PROJECT DESCRIPTION NONE CIRCULATION SYSTEM TRAFFIC SIGNALS - POINSElTIA LANE AND EL FUERTE STREET PROJECT NO. PROJECT NAME PROJECT LOCATION MAP: \ PROJECT LOCATION: Intersection of Poinsettia Lane and El Fuerte Street. PROJECT DESCRIPTION: Installation of an 8-phase, fully actuated traffic signal, including a Type 170 controller and 176 intersection control program. PROJECT NEED: Needed to comply with Growth Management Standards. FINANCING: Purpose Estimated Cost Fundinq Source DesignlConstruction $150.000 PFF Total Cost = $150,000 POlNSETl Page 219 CAPITAL PROJECT DESCRIPTION 38591 CIRCULATION SYSTEM TRAFFIC SIGNALS - POINSETTIA LANE AND MELROSE DRIVE PROJECT No. PROJECT NAME PROJECT LOCATION MAP: POINMELR 'ROJECT LOCATION: ntersection of Poinsettia Lane and Melrose Drive. JROJECT DESCRIPTION: nstallation of a 4-phase, fully actuated traffic signal, including a Type 170 :ontroller and 176 intersection control program. JROJECT NEED: qeeded to comply with Growth Management Standards. :INANCING: Purpose Estimated Cost Fundina Source Design/Construction $244,676 PFF Total Cost = $244,676 Page 220 CAPITAL PROJECT DESCRIPTION 38491 CIRCULATION SYSTEM TRAFFIC SIGNALS - POINSETTIA LANE AND PASEO ESCUELA PROJECT NO. PROJECT NAME I PROJECT LOCATION MAP: Poins-In ROJECT LOCATION: t the intersection of Poinsettia Lane and Paseo Escuela within Carrillo Ranch. ROJECT DESCRIPTION: Istallation of a fully traffic actuated traffic signal with Type 170 controller and ppurtenant striping and signing. 'ROJECT NEED: Lequire to provide safe ingress and egress into the San Marcos Elementan ichool site within the Rancho Carrillo Master Plan project. The signal was no! lade a condition of the master plan of the adjacent planning area project. The ignal should be installed prior to the extension of Poinsettia Lane West tC :I Fuerte Street or El Camino Real. :INANCING: Purmse Estimated Cost Fundina Source Construction $150,000 Gas Tax Total Cost = $150,000 Page 221 CAPITAL PROJECT DESCRIPTION NONE CIRCULATION SYSTEM TRAFFIC SIGNALS - POINSETTIA LANE AND SNAPDRAGON DRIVE PROJECT NO. PROJECT NAME I PROJECT LOCATION MAP: POINSNAP JROJECT LOCATION: 4t the intersection of Poinsettia Lane and Snapdragon Drive. JROJECT DESCRIPTION: xppurtenant striping and signing. nstallation of a fully traffic actuated traffic signal with Type 170 controller and JROJECT NEED: >altrans signal warrants have been met. The intersection is listed on the qualification list of the City’s Traffic Signal Evaluation Policy. =INANCING: PurDose Estimated Cost Fundinq Source Design $5,000 Gas Tax Construction $120,000 Gas Tax Total Cost = $125,000 Page 222 CAPITAL PROJECT DESCRIPTION NONE CIRCULATION SYSTEM TRAFFIC SIGNALS - RANCHO SANTA FE ROAD AND CALLE JUNIPER0 PROJECT NO. {FORMERLY MELROSE DRIVE SOUTH) PROJECT NAME 'ROJECT LOCATION MAP SIGNAL LOCATION _- ._ 'U 'ROJECT LOCATION: Ttersection of Rancho Santa Fe Road and future Calle Junipero, formerl) Aelrose Drive South. 'ROJECT DESCRIPTION: nstallation of a 4-phase, fully actuated traffic signal, including a Type 17C :ontroller and 176 intersection control program. 'ROJECT NEED: deeded to comply with Growth Management Standards. :INANCING: Pumose Estimated Cost Fundinq Source Design/Construction $150,000 PFF Total Cost = $1 50,000 RSFMELRO Page 223 CAPITAL PROJECT DESCRIPTION 34061 ClRCULATlON SYSTEM TRAFFIC SIGNALS - RANCHO SANTA FE ROAD AND SAN ELlJO ROAD No. jFORMERLY QUESTHAVEN ROAD) PROJECT NAME 'ROJECT LOCATION: qtersection of Rancho Santa Fe Road and San Elijo Road, formerly luesthaven Road. 'ROJECT DESCRIPTION: istallation of a 3-phase fully actuated traffic signal, including a Type 17C ontroller, 200 SA intersection control program, striping and signing, flashing leacons and intersection improvements to construct the signal. .he City of San Marcos is responsible for 1/3 share of this signal. Staff wil lursue a cost sharing agreement with the City of San Marcos. 'ROJECT NEED. deeded to comply with Growth Management Standards. :INANCING: PurDose Estimated Cost Fundlna Source Design/Construction $125,000 GCC Total cost = $125,000 RSFQUEST - ~ Page 224 CAPITAL PROJECT DESCRIPTION NONE CIRCULATION SYSTEM TRAFFIC SIGNALS -TAMARACK AVENUE AND PONTIAC DRIVE PROJECT NO. PROJECT NAME I PROJECT LOCATION MAP: Tam&pont PROJECT LOCATION: Intersection of Tamarack Avenue and Pontiac Drive. PROJECT DESCRIPTION: :ontroller, 200 SA local intersection control program and appurtenant stripins nstallation of a 3-leg, fully actuated traffic signal, including a Type 170 and signing. PROJECT NEED: 4 Caltrans traffic signal warrant has been met. The intersection is listed on the Traffic Signal Qualification List of the City's 2002 Traffic Signal Evaluatior Policy. The installation of this traffic signal will assign the right-of-way for botb notorists and pedestrians entering and crossing at this intersection. PurDose Estimated Cost Fundlna Source Construction $125,000 GCC Total Cost = $125,000 4nnUal Operating Cost = $5,000 Page 225 CAPITAL PROJECT DESCRIPTION NONE CIRCULATION SYSTEM TRAFFIC SIGNALS - TAMARACK AVENUE AND VALLEY STREET PROJECT NO. PROJECT NAME PROJECT LOCATION MAP: WOJECT LOCATION: ntersection of Tamarack Avenue and Valley Street. WOJECT DESCRIPTION: :ontroller, 200 SA local intersection control program and appurtenant striping nstallation of a 3-leg, fully actuated traffic signal, including a Type 170 md signing. WOJECT NEED: 4 Caltrans traffic signal warrant has been met. The intersection is listed on the rraffic Signal Qualification List of the Citvs 2002 Traffic Signal Evaluation 'olicy. The installation of this traffic signal will assign the right-of-way for both notorists and pedestrians entering and crossing at this intersection. This is an ?lementary school pedestrian crossing. :INANCING: PurDose Estimated Cost Fundinq Source Construction $125,000 GCC Total Cost = $125,000 \nnual Operating Cost = $5,000 Tam-vall Page 226 CAPITAL PROJECT DESCRIPTION NONE CIRCULATION SYSTEM TRAFFIC SIGNALS - TAMARACK AVENUE AND GARFIELD STREET PROJECT NO. PROJECT NAME DROJECT LOCATION MAP: 'ROJECT LOCATION: itersection of Tamarack Avenue and Garfield Street. 'ROJECT DESCRIPTION: istallation of a 2-phase, fully actuated traffic signal, including a Type 17C ontroller, 176 intersection control program, minor intersection improvements, igning and striping. 'ROJECT NEED: leeded to meet Growth Management Standards and future traffic signa rarrants. 3NANCING: Purpose Estimated Cost DesignlConstruction $150,000 Total Cost = $150,000 Fundina Source PFF TAMGAR Page 227 CAPITAL PROJECT DESCRIPTION NONE CIRCULATION SYSTEM TRAFFIC SIGNALS - TAMARACK AVENUE AND HIGHLAND DRIVE No. PROJECT NAME 'ROJECT LOCATION MAP: 'ROJECT LOCATION: ntersection of Tamarack Avenue and Highland Drive. 'ROJECT DESCRIPTION: nstallation of a 2-phase. fully actuated traffic signal, including a Type 170 nntroller. 176 intersection control program, minor intersection imprOVementS, iigning and striping. 'ROJECT NEED: deeded to comply with Growth Management Standards and traffic signal warrants. :INANCING: Purpose Estimated Cost Fundina Source DesignlConstruction $150,000 PFF Total Cost = $150,000 rAMAHlGH Page 228 STREET PROJECTS FUNDING MATRIX FOR STREET PROJECTS Page 229 Page 230 CAPITAL PROJECT DESCRIPTION 36161 CIRCULATION SYSTEM STREET PROJECTS -ALGA ROAD STREET LIGHTING PROJECT NO. ALICANTE ROAD TO EL FUERTE STREET PROJECT NAME 'ROJECT LOCATION MAP: 'ROJECT LOCATION: 4long Alga Road from Alicante Road to El Fuerte Street. WOJECT DESCRIPTION: iecessary conduit and conductors. Removal of thirty seven (37) existing pole- nstallation of thirty (30) street lights (200W HPS, mastarm-mounted) and nounted street lights on south side of Alga Road. WOJECT NEED 4lga Road to meet minimum City Standards for a major arterial. n response to citizen request, this project will upgrade street lighting on :INANCING: PurDose Estimated Cost Fundina Source Design Construction $606,358 $50,000 Total Cost = $656.358 Gas Tax Gas Tax ALGASTLT Page 231 CAPITAL PROJECT DESCRIPTION CIRCULATION SYSTEM STREET PROJECTS - ALGA ROAD MEDIANS PROJECT NAME PROJECT LOCATION MAP: 36371 & 36372 PROJECT NO. WOJECT LOCATION: 3n Alga Road from Paseo Candalero to El Fuerte Street. WOJECT DESCRIPTION: The installation of landscaping, irrigation and hardscape improvements within he median along Alga Road from El Camino Real to El Fuerte Street. The nedian improvements on Alga Road from El Camino Real to Alicante Road are :urrently the responsibility of the adjoining Villages of La Costa Development IS successor in interests to the Reimbursement Agreement for Public mprovements executed by the City and Daon Corporation on June 9, 1983. The remaining median improvements along Alga Road were developed under essor County Standards and cannot be made an obligation of any adjacent levelopment. WOJECT NEED: The existing median improvements along this portion of Alga Road are not in :onformance with City Standards and create a visual blight in the adjoining leighborhood. :INANCING: PurDose Constructic Design Estimated Cost Fundincl Source $70,000 In $1,030,000 Total Cost = $1,100,000 GCC IM&R Algamedi Page 232 CAPITAL PROJECT DESCRIPTION 'ROJECT LOCATION MAP: \ ~ JROJECT LOCATION: !long the west side of Avenida Encinas south of Palomar Airport Road ldjacent to the San Diego Northern Railway properly. JROJECT DESCRIPTION: Niden the west side of Avenida Encinas to full secondary arterial standards rom Palomar Airport Road to approximately 800 feet south. The work includes llacement of fill material and construction of new curbs, gutters, aggregate lase, asphalt paving and striping. JROJECT NEED: qequired to comply with Growth Management Standards. 3NANCING: PurDose Estimated Cost Fundinq Source Design/Construction $870,000 TIF Total Cost = $870,000 ,VENIDA Page 233 CAPITAL PROJECT DESCRIPTION 35461 CIRCULATION SYSTEM STREET PROJECTS - B&TD#2 AVIARA PARKWAY PROJECT NO. PALOMAR AIRPORT ROAD TO COBBLESTONE ROAD PROJECT NAME 'ROJECT LOCATION MAP: WOJECT LOCATION: llong Aviara Parkway from Palomar Airport Road to Cobblestone Road. WOJECT DESCRIPTION: :onstruction of center two lanes of Aviara Parkway including full width grading md right-of-way acquisition. 'ROJECT NEED: The project is needed to complete a Circulation Element roadway and to :omply with the Growth Management Program. :INANCING: Pumose Estimated Cost Fundina Source Reimbursements $1,611,500 B&TD #2 Total Cost = $1,611,500 POIN-PAR Page 234 CAPITAL PROJECT DESCRIPTION 35951 & 35952 CIRCULATION SYSTEM STREET PROJECTS - B&TD#2 - AVIARA PARKWAY TO BLACK RAIL ROAD PROJECT NO. PROJECT NAME PROJECT LOCATION MAP ~~ WOJECT LOCATION: 4long Poinsettia Lane from Aviara Parkway to Black Rail Road. WOJECT DESCRIPTION: :onstruction or reimbursement to developers for the construction of the )utside two lanes of Poinsettia Lane to major arterial standards including the :ost for full width grading and acquisition of right-of-way. The project is funded jrimarily from funds collected through formation of Bridge and Thoroughfare Iistrict No. 2 (B&TD#2). WOJECT NEED: 3equired to meet Growth Management Standards. :INANCING: Purpose Estimated Cost Fundina Source Design/Construct/Land Acquisition $7,098,000 B&TD #2 Design/Construct/Land Acquisition $1,822,000 PFF Total Cost $8,920,000 POlNAVlA Page 235 CAPITAL PROJECT DESCRIPTION CIRCULATION SYSTEM STREET PROJECl (BLACK RAIL ROAD 1 PRO. 'ROJECT LOCATION MAP: 36731 I&TD#2 POINSElTIA LANE - REACH "C" PROJECT NO. )NE 19 BOUNDARY) WOJECT LOCATION: llong future Poinsettia Lane from Black Rail Road to the existing terminus of 'oinsettia Lane at the western boundary of Zone 19. WOJECT DESCRIPTION: kquisition of full 102-foot width right-of-way for future Poinsettia Lane ncluding necessary slope and construction easements. Full width grading of he right-of-way to major arterial standards including any necessary drainage md erosion control measures. Construction of two 18-foot paved traffic lanes In either side of a raised unimproved median. The project is part of the rnprovements funded by Bridge and Thoroughfare District No. 2 (B&TD#2). 'ROJECT NEED: 2ompletion of this road segment combined with the road improvements to 'oinsettia Lane and Cassia Road currently under design and/or construction vill provide a complete road linkage from Interstate 5 to El Camino Real, hereby relieving some traffic on Palomar Airport Road and providing excellent mess to the future Zone 19 park site. Purpose Estimated Cost Fundinq Source DesignIConstructionl Land Acquisition $2,291,000 B&TD #2 Total Cost = $2,291 ,OW POINLANE Page 236 CAPITAL PROJECT DESCRIPTION 36741 CIRCULATION SYSTEM STREET PROJECTS - B&TD #2 POINSETTIA LANE REACHES "E", "F" & "G" PROJECT NO. {CASSIA ROAD TO EL CAMINO REAL) PROJECT NAME PROJECT LOCATION MAP: WOJECT LOCATION: 4long the future extension of Poinsettia Lane from its existing terminus at tht Zone 19/21 boundary east approximately 3,400 feet to El Camino Real. WOJECT DESCRIPTION: >onstruction of Reach "E of Poinsettia Lane including full width grading tc najor arterial standards, adequate drainage improvements necessary tc lrotect the roadbed, and two 18-foot paved traffic lanes separated by a raisec mimproved median. Also included within the project are all land acquisitior and environmental mitigation costs. The project is part of the improvement: unded by Bridge and Thoroughfare District No. 2 (B&TD#2). WOJECT NEED: 3equired pursuant to the City's Circulation Elements and Growth Managemen 'rogram. Purpose Estimated Cost Fundinq Source Design/Construction Land Acquisition $5,987,000 Total Cost = $5,987,000 B&TD#2 B&TD#2E Page 237 CAPITAL PROJECT DESCRIPTION 31 841.31 842. 31844&31845 CIRCULATION SYSTEM STREET PROJECTS - B&TD #3 - CANNON ROAD WEST PROJECT NO. PROJECT NAME PROJECT LOCATION MAP: CANNWEST PROJECT LOCATION: Future Cannon Road from Lego Drive to El Camino Real along the south si of the Agua Hedionda Lagoon. PROJECT DESCRIPTION: Work includes full width grading, curb and gutter, base and paving, rais Construct a 4-lane major arterial road from Lego Drive to El Camino Re five span, pre-stressed concrete bridge over the Macario Canyon draina landscaped median, sidewalks and streetlights, as well as a dual 450 foot lor channel and a 130 foot single span concrete bridge across Agua Hedion Creek at El Camino Real. In addition, the project includes the widening accommodate dual left turn lanes on to Cannon Road. The El Camino Rt El Camino Real north and south of the future Cannon Road intersection widening work includes median installation and widening of the existi El Camino Real bridge over Agua Hedionda Creek to provide for pedestri, access. NOTE: The eastern portion of Cannon Road West may be constructed entirc or in phases by the adjacent land developer. In such case, the C may reimburse the developer for eligible work in accordance with Council approved reimbursement agreement. PROJECT NEED: Required to comply with Growth Management Standards and to complete vital arterial roadway identified in the Circulation Element of the General Plan. FINANCING: Purwse Estimated Cost Fundina Source Construction $4,600,000 TransNeffHighway Construction $6,534,600 Construction $7,050,000 ECR Intersection $1,160,000 TIF Total Cost = $19,344,600 CFD #1 B&TD #3 Page 238 CAPITAL PROJECT DESCRIPTION 36821 CIRCULATION SYSTEM STREET PROJECTS - EL CAMINO REAL TO OCEANSIDE - PROJECT NO. CANNON ROAD REACH 4 PROJECT NAME PROJECT LOCATION MAP: "U I WOJECT LOCATION: 4long Cannon Road from future College Boulevard to the CarlsbadOceanside :ity limits. 'ROJECT DESCRIPTION: 2onstruction of Reach 4 of Cannon Road to full major arterial standards, ncluding all required environmental mitigation costs. WOJECT NEED: qequired pursuant to the City Circulation Element and to comply with the >rowth Management Circulation Standards. Since the project passes through he existing coastal sage habitat preserve area, it is not included as a financing equirement of any of the local facilities management plans. :INANCING: Pumose Estimated Cost Fundina Source Preliminary Design $100,000 GCC Total Cost = $100,000 Cannon34 Page 239 CAPITAL PROJECT DESCRIPTION 34371 & 35251 CIRCULATION SYSTEM STREET PROJECTS - CANNON ROAD WIDENING FROM 1-5 TO PASEO DEL NORTE PROJECT NO. PROJECT NAME 'ROJECT LOCATION MAP: c t t 'ROJECT LOCATION: :annon Road from Interstate 5 northbound ramps to Paseo del Norte. 'ROJECT DESCRIPTION: baving, and streetlights as required. Work will also include construction of a -he addition of one westbound traffic lane. Construction will include grading, emporary A.C. curb along the north right-of-way line, installation of median sndscaping and irrigation and construction of a fully actuated traffic signal tc iclude a Type 170 Controller. 'ROJECT NEED: +squired to meet Growth Management Standards. :INANCING: PurDose Estimated Cost Fundina Source Design/Construction $210,725 TIF Traffic Signal $165,000 PFF Total Cost = $375,725 CANNWIDE Page 240 CAPITAL PROJECT DESCRIPTION 38501 CIRCULATION SYSTEM STREET PROJECTS - CARLSBAD BOULEVARD PROJECT NO. ENCINAS CREEK BRIDGE RAILING PROJECT NAME PROJECT LOCATION MAP: PROJECT LOCATION: On southbound Carlsbad Boulevard at the Encinas Creek Bridge. PROJECT DESCRIPTION: Replace existing deteriorated bridge railing with new railing. This project is included with the Highway Bridge Replacement and Rehabilitation (HBRR) program and will receive 80% funding from Federal HBRR funds. PROJECT NEED: The existing bridge railing is deteriorated and in need of replacement for safety reasons. FINANCING: PurDose Estimated Cost Fundinq Source Design Construction $10,000 GCC $7,900 GCC Total Cost $17,900 Csbad-sb Page 241 CAPITAL PROJECT DESCRIPTION 34441 CIRCULATION SYSTEM STREET PROJECTS - CARLSBAD BOULEVARD MEDIAN PROJECT NO. TAMARACK AVENUE TO PINE AVENUE PROJECT NAME WOJECT LOCATION MAP PROJECT LOCATION: Carlsbad Boulevard from Tamarack Avenue to Pine Avenue. PROJECT DESCRIPTION: Construct raised, landscaped median. Work includes concrete curb, landscaping, irrigation and colored, stamped concrete. PROJECT NEED: The median is needed to brina this section of Carlsbad Boulevard up to City .. Standards for a major arterial. FINANCING: ~~ ~ ~ Purpose Estimated Cost Design/Construction $1,253,449 Total Cost = $1,253,449 Fundinq Source PFF CBMEDIAN Page 242 CAPITAL PROJECT DESCRIPTION 38541 CIRCULATION SYSTEM STREET PROJECTS - CARLSBAD BOULEVARD PEDESTRIAN ACCESS STUDY PROJECT NO. PROJECT NAME 'ROJECT LOCATION MAP , 'ROJECT LOCATION: :arkbad Boulevard from north city limits to State Street. 'ROJECT DESCRIPTION: The project involves the preparation of a feasibility study reviewing )edestrian/bicycle/vehicle access and safety issues along Carlsbad Boulevard tdjacent to the Buena Vista Lagoon and identification of potential safety mprovements. The report will also review the scope of the environmental and Iperational impacts on the corridor and development of a planning level Cost stimate of the various options identified in the study. WOJECT NEED: rhis project is needed to improve the safety for pedestrians and bicyclists raveling between Carlsbad and Oceanside along Carlsbad Boulevard. =INANCING: PurDose Estimated Cost Fundina Source Study/Report $105,000 GCC Total Cost = $105,000 Cbadnth Page 243 CAPITAL PROJECT DESCRIPTION 36171 CIRCULATION SYSTEM STREET PROJECTS - CARLSBAD BOULEVARD REALIGNMENT - PHASE 1 PROJECTNO. PROJECT NAME 'ROJECT LOCATION MAP: PROJECT ~~ ~ ?ROJECT LOCATION: Vong Carlsbad Boulevard from approximately 1200 feet south of Poinsettia -ane to approximately 1200 feet north of Poinsettia Lane. PROJECT DESCRIPTION: Reconstruction of Carlsbad Boulevard to conform with current City Standards for a major arterial roadway. The project also includes realignment of the ,oadway to the most easterly location possible within the existing right-of-waq Construction will occur concurrent with adjacent development pursuant to a imits. Phase I of the project occurs between Poinsettia Lane and Island Way. reimbursement agreement. PROJECT NEED: T3e project will maximize the use of the existing right-of-way along Carlsbac Boulevard. This will allow for possible expansion of the State Park facilities including additional beach parking spaces. The imminent development of the adjacent Poinsettia Properties project creates an opportunity to initiate the firs phase of the realignment project. Initial funding for the project will provide fol the preparation of preliminary engineering plans and environmental studies tc select an alignment and develop preliminary cost estimates for the eventua project. Purpose Estimated Cost Funding Source Reimbursement $1,830,000 Gas Tax Total Cost = SI ,830,000 Cbadreal2 Page 244 CAPITAL PROJECT DESCRIPTION 35571 PROJECT NO. CIRCULATION SYSTEM STREET PROJECTS - CARLSBAD BOULEVARD BRIDGE RETROFIT OVER SAN DIEGO NORTHERN RAILROAD PROJECT NAME I PROJECT LOCATION MAP: RRBRIDGE 'ROJECT LOCATION: )n Carlsbad Boulevard 500 southerly of its intersection with State Street. 'ROJECT DESCRIPTION: 'he project consists of removing the existing 72 year old two-lane bridge ana ;an Diego Northern Railroad. onstructing a new four-lane bridge with bicycle lanes and sidewalks over the 'ROJECT NEED: :altrans has determined that the bridge over the railroad is vulnerable tc iighways Administration will fund a seismic retrofit of the bridge. Given the evere damage during the design earthquake. Caltrans and the Federal Ige and conditions of the bridge, Caltrans has agreed to apply the retrofit funds Dwards the construction of a replacement bridge. Widening of the bridge is lecessary to bring this section of Carlsbad Boulevard into conformance witk :ity Standards and to assure compliance with Growth Management Standards It buildout. :INANCING: Purpose Estimated Cost Fundina Source Design $500,000 TransNetRocal Construction $soO,oOO TransNeVLocal Total Cost = $1,100,000 Page 245 CAPITAL PROJECT DESCRIPTION NONE CIRCULATION SYSTEM STREET PROJECTS - CARLSBAD BOULEVARD WIDENING - PROJECT NO. CANNON ROAD TO MANZANO DRIVE PROJECT NAME PROJECT LOCATION MAP: I I ~ PROJECT . WOJECT LOCATION: 2arlsbad Boulevard from Manzano Drive to Cannon Road. WOJECT DESCRIPTION: Niden Carlsbad Boulevard from two lanes to four lanes with a center raisec nedian (major arterial). Construct pavement, curb and gutter, stampec :onCrete and landscaping. 4 planning study was initiated in 1992 to determine alignment alternatives anc nvestigate property access problems. 'ROJECT NEED: 3equired to meet Growth Management Standards and the Circulation Elemen d the General Plan. :INANCING: PurDose Estimated Cost Fundina Source Design/Construction $2,000,000 TIF Total Cost = $2,000,000 CBADWIDE Page 246 CAPITAL PROJECT DESCRIPTION NONE ClRCULATlON SYSTEM STREET PROJECTS - CARLSBAD VILLAGE DRIVE WIDENING No. PROJECT NAME 'ROJECT LOCATION MAP: XDWIDEN 'ROJECT LOCATION: )n Carlsbad Village Drive from 200 feet east of PontiaC Drive to 200 feet east jf Victoria Street. 'ROJECT DESCRIPTION: Widen Carlsbad Village Drive to secondary arterial standards; street is :urrently only half-width. Construct curb & gutter, sidewalk, streetlights, nedian curb, base and asphalt pavement. The project design may include ;tandard modifications consistent with local environmental and topographical :onstraints of the project site. 'ROJECT NEED: qequired to meet Growth Management Standards and the Circulation Element )f the General Plan. :INANCING: PurDose Estimated Cost Fundina Source Design/Construction $1.260.000 TIF Total Cost = $1,260,000 Page 247 CAPITAL PROJECT DESCRIPTION PROJECT LOCATION MAP: PROJECT NO. 38551 PROJECT LOCATION: Along the south side of Chestnut Avenue from Cameo Road to Celinda Drive. PROJECT DESCRIPTION: Construct 3,000 lineal feet of fencing/wall adjacent to the Chestnut Avenue right-of-way. PROJECT NEED: The recent widening of Chestnut Avenue created a new slope adjacent to existing residents. Existing walls were relocated, but due to elevation differences brought about by the new slope, wall heights were reduced. Also, the relocated fences were not uniform and left an unsightly appearance. FINANCING: PurDose Estimated Cost Fundina Source Design/Construction $103,875 GCC Total Cost = $1 03,875 Cheswall Page 248 CIRCULATION SYSTEM STREET PROJECTS - ( I PROJECT LOCATION MAP: CAPITAL PROJECT DESCRIPTION 36361,36362 & 38141 ZOLLEGE BOULEVARDlCANNON ROAD REACH 3 PROJECT NO. JECTI.---- I- I I 1 I 1 I 1 i i I I I ! I ( ( 1 PROJECT LOCATION: Along the extension of College Boulevard from El Camino Real to Carlsbac Village Drive and along the extension of Cannon Road from El Camino Real tc College Boulevard. PROJECT DESCRIPTION: Formation of a Bridge and Thoroughfare District (B&TD#4) for the purpose o financing the construction of the above described sections of Collegt Boulevard and Cannon Road. The improvements within the project include ful width grading of the College and Cannon roadways to major arterial standards :onstruction of the center two lanes separated by a raised unimproved median installation of needed drainage improvements to protect the roadbed, and ful width improvements of the arterial intersections with El Camino Real. Alsc Included is a bridge structure on College Boulevard at the Agua Hediond; Creek overcrossing. The outside traffic lanes, fronting improvements an( nedian landscapinghardscaping will be the obligation of adjacent developin( 3roperly owners. PROJECT NEED: The project is required to complete the Circulation Element of the General Plar and to comply with the Growth Management Standard for circulation facilities Financing for the project is required prior to any further development withir Zones 7, 14, and 15. Construction of the project may occur in phase: :onsistent with the requirements of the various individual zone plans. The CiQ :ost for district formation will be recouped from B&TD#4 fees upon formation o :he district. Pumose Estimated Cost Funding Source District Formation/ Preliminary Studies Preliminary Enaineerina Desian .- I ConGruction Construction Construction $505,421 $1,292,221 $150,000 $2,600,000 $10,902,779 $1,611,000 GCC (Loan) TransNet Hwy. 78 B&TD#4 PLDA "B" TransNet Hwy. 78 B&TDW Total Cost = $1 7,061,421 WTD-4 Page 249 CAPITAL PROJECT DESCRIPTION CIRCULATION SYSTEM STREET PROJECTS - EL CAMINO REAL AND CAMINO VlDA ROBLE PROJECT NO. 38121 PROJECT NAME PROJECT LOCATION MAP: I I II 11 II I1 /I I1 I1 II I1 Tr II 11 I/ 11 /I aROJECT LOCATION: 9t the intersection of El Camino Real and Camino Vida Roble. WOJECT DESCRIPTION: >onstruct dual left-turn lanes and modify traffic signal. WOJECT NEED: 3equired to meet Growth Management Standards. :INANCING: Purpose Estimated Cost Fundina Source Planning $40,000 Land Acquisition $80,000 Design $80,000 Construction $200,000 Total Cost = $400,000 TIF TIF TIF TIF ECRCAMIN Page 250 CAPITAL PROJECT DESCRIPTION NONE CIRCULATION SYSTEM STREET PROJECTS - EL CAMINO REAL AND CARLSBAD VILLAGE DRIVE PROJECT NO. PROJECT NAME PROJECT LOCATION MAP: I CARLSBAD VILMGE DR. WOJECT LOCATION: 4t the intersection of El Camino Real and Carlsbad Viltage Drive. 'ROJECT DESCRIPTION: >onstruct northbound and southbound dual left-turn lanes on El Camino Real. WOJECT NEED: 3equired to meet Growth Management Standards. =INANCING: Purpose Estimated Cost Fundina Source Construction $320,000 TIF Total Cost = $320,000 iCRCVDR Page 251 CAPITAL PROJECT DESCRIPTION 36071 PROJECT NO. CIRCULATION SYSTEM STREET PROJECTS - EL CAMINO REAL AND FARADAY AVENUE PROJECT NAME 'ROJECT LOCATION MAP: ""_ II I1 il II 11 ti ,. ' FARADAY AVE. 'ROJECT LOCATION: 'he intersection of El Camino Real and Faraday Avenue. 'ROJECT DESCRIPTION: itersection improvements which include adding three exclusive right turns southbound, eastbound and westbound). Construct curb and gutter, asphalt lavement and sidewalk. Additional right-of-way will be required. 'ROJECT NEED: 3equired to meet Growth Management Standards. Purpose Estimated Cost Fundina Source PlanningIStudy $1 0,000 TIF Design $60,000 TIF Construction $640,000 TIF Total Cost = $710,000 ECRFARAD Page 252 CAPITAL PROJECT DESCRIPTION PROJECT LOCATION MAP: WOJECT LOCATION: 3n El Camino Real at Aviara Parkway/Alga Road. WOJECT DESCRIPTION: :onstruction of median improvements and lane striping immediately south o iviara Parkway/Alga Road to accommodate dual northbound to westbounc urn lanes. May include modification to the existing traffic signal standards. WOJECT NEED: 3equired to comply with Growth Management Standards. :INANCING: PurDose Estimated Cost Fundinq Source Design/Construction $250,000 TIF Total Cost = $250,000 ECRAVIAR Page 253 CAPITAL PROJECT DESCRIPTION NONE CIRCULATION SYSTEM STREET PROJECTS - EL CAMINO REAL IMPROVEMENTS PROJECT NO. PROJECT NAME PROJECT LOCATION MAP \ CIN OF ENCINITK PROJECT LOCATION: darious segments of El Camino Real. WOJECT DESCRIPTION: 2onstruction of curb, gutter, sidewalks, pavement, median, roadway 'ehabilitation, and signal modifications on El Camino Real. Roadway widening iites include: b El Camino Real south of Cougar Drive El Camino Real at Rancho Real D El Camino real north of Poinsettia Lane WOJECT NEED: 4djacent properly is fully-developed. Project will fund roadway improvements to ~rovide full-width construction of El Camino Real. :INANCING: Pumose Estimated Cost Fundinq Source Design $180,000 TransNet Local Environmental Construction $3,000,000 20,000 TransNet Local TransNet Local Total Cost = $3,200,000 Elcamino Page 254 CAPITAL PROJECT DESCRIPTION CIRCULATION SYSTEM STREET PROJECTS - EL CAMINO REAL MEDIANS PROJECT NAME I PROJECT LOCATION MAP: \ 36431 PROJECT NO. PROJECT LOCATION: 4t various locations along El Camino Real between the north and south Cit Joundaries. WOJECT DESCRIPTION: 2onstruct raised, landscaped medians at various places where no develope will be obligated to do so as a condition of a private development. Worl ncludes median curb, stamped concrete paving, irrigation and landscaping. VOTE: Project funds may be used to reimburse developer for construction o the development. Currently, $100,000 is budgeted to reimburse thf median improvements in excess of those improvements required o to the Rancho Carlsbad Mobile Home Park. Evans Point developer for median improvements constructed adjacen WOJECT NEED: Iaised landscaped medians md to meet City standards. are required on prime arterials for vehicular safet! PurDose Estimated Cost Fundina Source Construction $1,850,000 PFF Tots1 Cost = $1,850,000 ECRMDIAN Page 255 CAPITAL PROJECT DESCRIPTION NONE CIRCULATION SYSTEM STREET PROJECTS - EL CAMINO REAL WIDENING PROJECT NO. LA COSTA AVENUE TO ARENAL ROAD PROJECT NAME PROJECT LOCATION MAP: I ECRLACOS WOJECT LOCATION: 3n the west side of El Camino Real from La Costa Avenue to Arena1 Road. WOJECT DESCRIPTION: 4dd the southbound lane for a length of approximately 3,400 feet to widen tht street to full prime arterial standards. Construct curb & gutter, sidewalk, base md asphalt pavement and streetlights. 'ROJECT NEED: qequired to comply with Growth Management Standards. ;INANCING: Purpose Estimated Cost Fundina Source Design/Construction $450,000 TIF Total Cost = $450,000 Page 256 CAPITAL PROJECT DESCRIPTION 33271 CIRCULATION SYSTEM STREET PROJECTS - EL CAMINO REAL WIDENING PROJECT NO. TAMARACK AVENUE TO CHESTNUT AVENUE PROJECT NAME WOJECT LOCATION MAP: 'ROJECT LOCATION: \long El Camino Real from Tamarack Avenue to Chestnut Avenue. 'ROJECT DESCRIPTION: 4dd the outside lane to widen street to full prime arterial standards. Widen vest side approximately 1,200 feet in length and east side approximately io0 feet in length. Construct curb & gutter, sidewalk, base, and asphalt )avement and streetlights. 'ROJECT NEED: -0 complete widening to prime arterial standards where no developers are ikely to develop and to improve the road capacity. :INANCING: Purpose Estimated Cost Fundlna Source Design/Construction $2,024,708 TIF Total Cost = $2,024,708 iCRWIDE2 Page 257 CAPITAL PROJECT DESCRIPTION 36221,36222, 36223,36224 CIRCULATION SYSTEM STREET PROJECTS - F, "me 'ROJECT LOCATION MAP: OCEANSIDE L L r-+ IAY AVENUElMELROSE DRIVE EXTENSIONS PROJECT NO. & 36225 UAMF \long the extension of Melrose Drive from Palomar Airport Road to the CarlsbadNista :ity limit and along the extension of Faraday Avenue from Orion Way to Melrose Drive n Vista. PROJECT DESCRIPTION: 2onstruction of two lanes of Faraday Avenue approximately 1.3 miles from its curreni :erminus at Orion Way easterly to Melrose Drive in the City of VisIa and the :onstruction of four lanes of Melrose DiNe approximately 0.3 miles from Palomal 4irport Road to its current terminus at the CarlsbadNista city boundary. The projecl Nould include the reconstruction of a portion of existing Melrose Drive in the City 01 dista and the construction of a bridge over the Agua Hedionda Creek along Faraday \venue. The project also includes construction of 16-inch potable and 8-inch recycled Mater main and a sewer main within the Faraday roadbed. PROJECT NEED: The project is required to complete the Circulation Element of the General Plan and to :omply with the Growth Management Standard. The project will divert significanl mounts of traffic from existing Palomar Airport Road by providing a second eastlwesl 3rterial linkage from Melrose Drive to Interstate 5 through the core of the Carlsbad and dista industrial centers. 9NANCING: Purpose Estimated Cost Funding Source Preliminary Studies Preliminary Studies $60,000 DesionIConstruction $14.790.854 $255,610 GCC Gas Tax B&TD #S ~ ~~ ~~~~~ ~ ~,~ "," DGidConstruction $3,000,000 * DesigdConstruction FederaVSTP $1,200,000 ++ PLDA '6" Design Design $97,210 ++ $110,200 ++ Water Connection Sewer Replacement Total Cost I $19,513,874 'Funding is not confirmed and, therefore, not shown in CIP schedules. k+Completed - Project Nos. 36223, 36224, 36225 XQA Status: EIR pending certification. Far-melr Page 258 CAPITAL PROJECT DESCRIPTION PROJECT LOCATION MAP FARADAY 'ROJECT LOCATION: \lorth side of Faraday Avenue, east of Cannon Road. 'ROJECT DESCRIPTION: donitoring and maintenance of a coastal sage scrub mitigation site. 'ROJECT NEED: 3equired by Resource Agency permits to construct Faraday Avenue. 3NANCING: PurDose Estimated Cost Fundina Source Mitigation Maintenance $130,000 CFD#l Total Cost = $130,000 Page 259 CAPITAL PROJECT DESCRIPTION CIRCULATION SYSTEM FREEWAY INTERCHANGE PROJECTS - INTERSTATE 5 AND PROJECT NO. 32191 LA COSTA AVENUE AUXILIARY LANES PROJECT NAME PROJECT LOCATION MAP: 'ROJECT LOCATION: 4t the intersection of Interstate 5 and La Costa Avenue. WOJECT DESCRIPTION: The addition of auxiliary traffic lanes on Interstate 5 to be installed at the future lirection of Caltrans. WOJECT NEED: 3equired to meet Growth Management Standards. :INANCING: PurDose Estimated Cost Fundinq Source Design/Construction $1,500,000 CFD #1 Total Cost = $1,500,000 I-5LAcos Page 260 CAPITAL PROJECT DESCRIPTION 36721 CIRCULATION SYSTEM STREET PROJECTS - LA COSTA AVENUE SIDEWALKS PROJECT NO. PROJECT NAME WOJECT LOCATION MAP: 0 PROPOSED LOCATIONS OF TEMPORARY A.C. SIDEWALK PROJECT LOCATION: 4t 13 various locations along the north side of La Costa Avenue from II Camino Real to Gibralter Street. PROJECT DESCRIPTION: :onstruction of approximately 1,450 lineal feet of asphalt concrete sidewalk ldjacent to 13 separate vacant parcels along the north side of La Costa 4venue. Installation of these sidewalk improvements will complete the sidewalk linkage along the north side of La Costa Avenue from Rancho Santa =e to El Camino Real. The interim improvements will ultimately be replaced nith City Standard concrete sidewalks as the adjacent vacant parcels develop. PROJECT NEED: This stretch of La Costa Avenue was constructed without sidewalks while undel Sounty jurisdiction. Upon annexation to the City, the adjacent property owners qave been required to install sidewalk frontage improvements in accordance Nith City Standards upon development of their respective properties. FOI tarious reasons, 13 of the properties have remained vacant and withoul sidewalk improvements. Pedestrians wishing to travel along La Costa Avenue nust presently cross the unimproved frontages along dirt trails. In response ta :itizen and pedestrian requests, the City Council directed staff to install interim asphalt concrete sidewalks across the 13 vacant parcels. PurDose Estimated Cost Fundins Source DesignIConstruction $1 50,000 GCC Total Cost = $150,000 LACOSTSW Page 261 CAPITAL PROJECT DESCRIPTION NONE CIRCULATION SYSTEM STREET PROJECTS - MELROSE DRIVE AND ALGA ROAD PROJECT NO. PROJECT NAME 'ROJECT LOCATION MAP: 9 i - ""_ -1. I ""_ ALGA ROAD 'ROJECT LOCATION: it the intersection of Melrose Drive and Alga Road. 'ROJECT DESCRIPTION: :onstruct dual left-turn lanes on all approaches to the intersections- lorthbound, southbound, eastbound and westbound. 'ROJECT NEED: 3equired to meet Growth Management Standards. :INANCING: Purpose Estimated Cost Fundina Source Design/Construction $480.000 TIF Total Cost = f480,oOo MELROALG Page 262 CAPITAL PROJECT DESCRIPTION CIRCULATION SYSTEM STREET PROJECTS - OCEAN STREET IMPROVEMENTS PROJECT NO. 36841 PROJECT NAME PROJECT LOCATION MAP: PROJECT LOCATION: Along Ocean Street from Oak Avenue to Pacific Avenue. PROJECT DESCRIPTION: Street to accommodate drainage, pedestrians and street parking. Futurf Preparation of a comprehensive alignment study for the improvement of Ocear construction would continue to occur as adjacent properties develop ir accordance with the proposed comprehensive plan. The City may alsc construct portions of the road if necessary to complete needed links as fundins becomes available. PROJECT NEED: Ocean Street is an important coastal access route for the North Carlsbac beaches. The existing street improvements were constructed in patch work fashion over the years by various developing andlor redeveloping properties In many areas, Ocean Street remains partially unimproved. The resulting roac includes sections of narrowed roadway widths, substandard or nonexisten sidewalks, poor street drainage and inadequate parking spaces. Completion o a comprehensive set of improvement drawings would greatly facilitate the future construction of Ocean Street either as a City project or by adjacenl developing property owners. FINANCING: Purpose Estimated Cost Fundina Source PlanningBudy Design $50,000 $120,000 Total Cost = $170,000 Gas Tax Gas Tax Ocean Page 263 CAPITAL PROJECT DESCRIPTION 38521 CIRCULATION SYSTEM STREETS PROJECTS - OLIVENHAIN ROAD WIDENING PROJECT NO. MITIGATION MONITORING PROJECT NAME 'ROJECT LOCATION MAP: BLVD 'ROJECT LOCATION: )livenhain Road from El Camino Real to approximately 700 feet west 01 rrmagosa Drive. 'ROJECT DESCRIPTION: :ompletion of the five-year monitoring of the environmental mitigatior wasures installed concurrent with the realignment, reconstruction anc ridening of Olivenhain Road to prime arterial standards. 'ROJECT NEED: lequired pursuant to environmental permits. :INANCING: PurDose Estimated Cost Fundinq Source Mitigation Monitoring 515,000 CFD #2 Total Cost = 51 5,000 OLVNROAD Page 264 CAPITAL PROJECT DESCRIPTION CIRCULATION SYSTEM STREET I EL CAMINO REAL 1 PRO, WOJECT LOCATION MAP: JECTS - ORION STREET FROM IRADAY AVENUE 36031 & 36032 PROJECT NO. 'ROJECT LOCATION: \long Orion Street from El Camino Real to Faraday Avenue adjacent to the County Vaste Transfer Station and along the east side of El Camino Real from the intersection vith Orion Street to approximately 400 feet south. 'ROJECT DESCRIPTION: :onstruction of a 40-foot wide (curb-to-curb) street from El Camino Real to Faraday (venue (at its intersection with Orion Street). Length is approximately 2,000 feet. :onstruct sidewalk on both sides, curb 8, gutter pavement and street lighting. Project llso includes extending the existing acceleration lane on the east side of El Camino 7eal north of Palomar Airport Road to the access road, a distance of approximately .OO feet. 'ROJECT NEED: 'he existing access road sewing the Coast Waste Management facility, the Carlsbad hunicipal Water District headquarters, and the City Hiring Center is severely leteriorated and in need of major rehabilitation. In an attempt to remedy the situation, he City imposed a condition on a proposed CUP modification of the Coast Waste acility to repair and rehabilitate the existing access road. Since the property was lwned by the County, Coast Waste Management Company felt it was a County lbligation. In a settlement agreement amon st the three parties, the County agreed 3 reimburse the City up to $500,000 9 or the improvement of the access oad, installation of a right-turn lane on El Camino Real, and to add dual left-turn lanes It the Faraday intersection with El Camino Real. The City a reed to act as lead for the :onstruction of these improvements. The Faraday Avenue/if Camino Real intersection nprovements are included in a separate project description. :INANCING: Purpose Estimated Cost Funding Source Design Construction Construction $500:000 Total Cost = $1,272,908 GCC GCC County Orion Page 265 CAPITAL PROJECT DESCRIPTION NONE CIRCULATION SYSTEM STREET PROJECTS - PALOMAR AIRPORT ROAD AND COLLEGE BOULEVARD PROJECT NO. PROJECT NAME PROJECT LOCATION MAP: i IT '\ I '\ I 1, :w .w :" .2 :- 0 io PALOMAR AIRPORT ROAD PROJECT LOCATION: 4t the intersection of the Palomar Airpolt Road and College Boulevard. WOJECT DESCRIPTION: :onstruct dual left-turn lane on College Boulevard southbound to eastbound 'roject work includes reconstruction of median improvements, striping an( 3ignal modifications. Additional right-of-way will be required. 'ROJECT NEED: 3equired to meet Growth Management Standards. Purpose Estimated Cost Fundina Source Design/Construction $160,000 TIF Total Cost = $1 60,000 PARCOLLE Page 266 CAPITAL PROJECT DESCRIPTION CIRCULATION SYSTEM STREET PROJECTS - PALOMAR AIRPORT ROAD WIDENING AND PROJECT NO. NONE BRIDGE RECONSTRUCTION PROJECT NAME I PROJECT LOCATION MAP: PROJECT LOCATION: On Palomar Airport Road between Carlsbad Boulevard and 1-5 over the Sar Diego Northern Railway. PROJECT DESCRIPTION: Reconstruct old interchange and connect Palomar Airport Road to Carlsbac Boulevard with a standard signalized tee intersection. Construct four lanes 3f asphalt pavement on Palomar Airport Road (600 feet) and Carlsbac Boulevard (1,000 feet) including curb and gutter, medians, sidewalk streetlights, traffic signal and new bridge over railroad. PROJECT NEED: Required to meet Growth Management Standards. Project will improve the :apacity of the intersection and free two parcels of land which the City car ease or develop. FINANCING: PurDose Estimated Cost Fundinq Source Construction Design $750,000 $6,450,000 PFF PFF Total Cost = $7,200,000 PARBRIDG Page 267 CAPITAL PROJECT DESCRIPTION CIRCULATION SYSTEM STREET PROJECTS - PALOMAR AIRPORT ROAD WIDENING AT PROJECT NO. 38111 PASEO DEL NORTE PROJECT NAME WOJECT LOCATION MAP: Pargdn PROJECT LOCATION: 3n the north side of Palomar Airport Road at the intersection with Paseo Del Vorte. WOJECT DESCRIPTION: Niden the easterly approach of Palomar Airport Road (PAR) at the intersection If Paseo Del Norte (PDN) to accommodate an additional through lane. The added lane would be designed to align with the existing "right-turn only" lane mto northbound Interstate 5. The existing westbound to northbound right-turn ane from PAR to PDN would be relocated slightly north of its current location to ?liminate the partial offset with the existing "right-turn only' lane on the wesi side of the intersection. PROJECT NEED: 3equired to meet the Growth Management Circulation Standard. The curreni ntersection is operating at an unacceptable level of service due to a backup oi :raffic attempting to go northbound along Interstate 5. A current CIP project will econfigure the existing PAW-5 northbound intersection to allow for dual .ight-turn movements onto the freeway. This project will allow for smoother ,ransition of the westbound to northbound traffic into the two right-turn lanes 'rom traffic proceeding westbound along PAR through the PDN intersection. FINANCING: Purpose Estimated Cost Fundina Source Planning/Study $50,000 TIF Land Acquisition $100,000 TIF Design $80,000 TIF Construction $250,000 TIF Total Cost = $480,000 Page 268 CAPITAL PROJECT DESCRIPTION 36671.36791 & 38681 CIRCULATION SYSTEM STREET PROJECTS - PAVEMENT MANAGEMENT PROGRAM PROJECT NO. PROJECT NAME 'ROJECT LOCATION MAP: THROUGHOUT THE CITY 'ROJECT LOCATION: -hroughout the City. 'ROJECT DESCRIPTION: o extend the service lie of city streets and to maintain a smooth and safe -he Pavement Management Program is an ongoing annual program designed Iriving surface for vehicles. The City utilizes a pavement management latabase program to determine pavement management needs for the purpose If establishing which streets are to be oil sealed, chipped sealed, overlaid or md the pavement management database is updated to reflect current econstructed. On a periodic basis the condition of the roads are field surveyed :onditions. Each year, specific pavement management projects are defined md funding is transferred into a pavement management project account. WOJECT NEED: :ity streets require annual maintenance to maintain a safe and smooth driving urface and to extend the useful service life of the streets. :INANCING: PurDose Estimated Cost Fundina Source Pavement Management $19,849,348 TransnetRocal Pavement Management $15,731,088 Gas Tax Pavement Management $814,065 State Grant Pavement Management $121,182 PAR Assessment District Total Cost = $36,515,723 PVMTMGMT Page 269 CAPITAL PROJECT DESCRIPTION 36891 CIRCULATION SYSTEM STREET PROJECTS - POINSElTIA LANE EAST OF EL CAMINO REAL PROJECT NO. FINANCING PROGRAM PROJECT NAME PROJECT LOCATION MAP: ~ PROJECT LOCATION: Nong the future alignment of Poinsettia Lane from El Camino Real east to FI Fuerte Street. PROJECT DESCRIPTION: =ormation of a financing districtlprogram to guarantee the construction 01 'oinsettia Lane to full major arterial standards west of El Camino Real. The xoject, in conjunction with the Poinsettia Lane improvements proposed west of 3 Camino Real, will complete another easthest arterial linkage from Melrose 3rive to Interstate 5. WOJECT NEED: 3equired pursuant to the City Circulation Element and Growth Management 'rogram. The recent failure of the PAR/ECR intersection to meet the Growth danagement circulation standard makes it imperative to construct additional ?astlwest arterial connectors to reduce traffic loads along the PAR corridor. PurDose Estimated Cost Fundina Source Preliminary Engineering $100,000 Total Cost = $100,000 GCC Poineast Page 270 CAPITAL PROJECT DESCRIPTION CIRCULATION SYSTEM STREET PROJECTS - POINSETTIA LANE RAILROAD BRIDGE WIDENING PROJECT NO. 35511 & 38291 PROJECT NAME PROJECT LOCATION MAP: PROJECT LOCATION: 4long Poinsettia Lane between Carlsbad Boulevard and Avenida Encinas ove he San Diego Northern Railway. WOJECT DESCRIPTION: 3nly one-half width bridge currently exists over the railroad. This project wil :omplete the other half of the prestressed concrete bridge so that four lanes o his major arterial can continue across the railroad. WOJECT NEED: 3equired to meet Growth Management Standards and identified in the >irculation Element of the General Plan. :INANCING: Pumose Estimated Cost Fundina Source Design Construction $300,000 $1,831,358 PFF PFF $240,000 Recycled Water Total Cost = $2,371,358 POINBRDG Page 271 CAPITAL PROJECT DESCRIPTION CIRCULATION SYSTEM STREET PROJECTS - POINSETTIA LANE WIDENING NONE PROJECT NO. lPASE0 DEL NORTE TO BATlQUlTOS LANE) PROJECT NAME WOJECT LOCATION MAP: PROJECT LOCATION: From Paseo Dei Norte to Batiquitos Lane. PROJECT DESCRIPTION: Niden Poinsettia Lane from Paseo Del Norte to Batiquitos Lane to six lanes b) 3dding one lane in each direction. Construct curb and gutter, base, asphali lavement and sidewalk. Right-of-way is required. PROJECT NEED: 3equired to meet Growth Management Standards. FINANCING: PurDose Estimated Cost Fundina Source Design/Construction $1,870,000 TIF Total Cost = $1,870,000 POINWIDE Page 272 CAPITAL PROJECT DESCRIPTION CIRCULATION SYSTEM STREETS PROJECTS - OLIVENHAIN ROAD/ RANCHO SANTA FE ROAD INTERSECTION PROJECT NAME 'ROJECT LOCATION MAP: PROJECT NO. NONE 'ROJECT LOCATION: ntersection of Rancho Santa Fe Road and Olivenhain Road, 'ROJECT DESCRIPTION: :omplete full intersection improvements to the Rancho Santa Fe Road and )livenhain Road intersection to General Plan standards. Extend streel nprovements on Rancho Santa Fe Road between the Olivenhain Municipal Vater District access to a distance approximately 200 feet east of the itersection with Olivenhain Road. Extend street improvements on Olivenhain load from the intersection with Olivenhain Road west to meet existing ull-width improvements within the City of Encinitas. The project would involve ight-of-way acquisition, grading, storm drains, removal of existing nprovements and installatlon of surface improvements, street lights, and :oordination with agencies for utility realignment 'ROJECT NEED: -hese improvements are required in order to keep intersection capacity at 01 below the thresholds dictated by the Growth Management Standards and pel le General Plan for build-out. Full intersection improvements will improve ,ehicular circulation and increase safety to serve the public and nearby levelopments to the south that will im act the intersection once full occupancy j reached. The City of Encinitas and glivenhain Municipal Water District are in .upport of the project and will reimburse the City of Carlsbad for their share oi he improvements. PurDose Estimated Cost Fundina Source Studies/Reports Environmental Property Acquisition Construction Design Construction $15,000 $65,000 $105,000 $2,333,691 $1,151,000 $120,000 CFD #2 CFD #2 CFD #2 CFD #2 CFD #2 Other Total Cost = $3,789,691 'roiect requires additional CEQA processing. Olivenrsf Page 273 CAPITAL PROJECT DESCRIPTION 31 904 & 31 906 CIRCULATION SYSTEM STREET PROJECTS - RANCHO SANTA FE ROAD NORTH PHASE I PROJECT NO. PROJECT NAME PROJECT LOCATION MAP: PROJECT WOJECT LOCATION: Zlong the future alignment of Rancho Santa Fe Road from La Costa Avenue to ipproximately 1,800 feet south of Questhaven Road. WOJECT DESCRIPTION: :onstruction of 4 lanes of Rancho Santa Fe Road to prime arterial standards ncluding full width grading. Project involves the realignment of Rancho Santa -e Road easterly of its present alignment to a location approximately in the irea of the current truck bypass route. WOJECT NEED: qequired to meet Growth Management Standards. :INANCING: PurDose Estimated Cost Fundinq Source Design/Construction $5,700,000 Design/Construction $21.882.900 CFD #1 CFD #2 Total Cost = $27,582,900 RSFN-PHI Page 274 CAPITAL PROJECT DESCRIPTION NONE CIRCULATION SYSTEM STREET PROJECTS - RANCHO SANTA FE ROAD NORTH PHASE II PROJECT NO. PROJECT NAME WOJECT LOCATION MAP: PROJECT WOJECT LOCATION: 4long Rancho Santa Fe Road from approximately 1,800 feet south of 3uesthaven Drive to Melrose Drive. 'ROJECT DESCRIPTION: 2onstruction of Rancho Santa Fe Road bridge over the San Marcos Creek. WOJECT NEED: qequired to meet Growth Management Standards. :INANCING: Purvose Estimated Cost Funding Source Bridge $5,821,600 * Federal Grant (HBRR) Total Cost = $5,821,600 Excludes $320,000 previously spent for design. RSFNPHll Page 275 CAPITAL PROJECT DESCRIPTION 3391 1,3391 3 35601,36081 & 3671 1 CIRCULATION SYSTEM STREET PROJECTS - SIDEWALWSTREET CONSTRUCTION PROGRAM PROJECT NO. PROJECT NAME 'ROJECT LOCATION MAP N/A i PROJECT LOCATION: Various streets throughout the City. PROJECT DESCRIPTION: The SidewalWStreet Construction Program is an annual program designed to :omplete missing links of sidewalk throughout the City. In most cases, :onstruction of the sidewalk improvements involve construction of adjacent stfeet improvements to bring them into conformance with City Standards. Each /ear, several sidewalWstreet projects are selected from the City's missing idewalk priority list for inclusion into that year's sidewalWstreet construction Iroject. WOJECT NEED: +squired to meet the pedestrian circulation policies of the Circulation Element If the General Plan. :INANCING: Pumose Estimated Cost Fundina Source Design/Construction $6,538,804 TIF Design/Construction $270,300 TDA Design/Construction $603,557 TransNetiLocal Total Cost = $7,412,661 SWCONPGM Page 276 CAPITAL PROJECT DESCRIPTION 38131 CIRCULATION SYSTEM STREET PROJECTS - TRAFFIC IMPACT FEE STUDY UPDATE PROJECT NO. PROJECT NAME PROJECT LOCATION MAP: NOT APPLICABLE TlFstudy 'ROJECT LOCATION: :itywide. 'ROJECT DESCRIPTION: 'reparation of a new Traffic Impact Fee Study Report for the purpose 01 lpdating the existing Traffic Impact Fees. The new study will remove from :onsideration completed and/or unnecessary projects and include any newl) dentified project needs. Also included in this project will be a new analysis 01 he future traffic impacts using the latest City land use assumptions. The current Traffic Impact Fee Program was last updated in 1991. Over the last few years, there has been a significant increase in development activity Aany of the roads included in the fee program have been constructed. Othel ncluded road projects will be built from other funding sources. Also land USE :hanges. especially with regard to habitat preservation, have altered the future raffic generation rates for City buildout. A new traffic fee study is needed tc tnalyze the past changes and current buildout traffic needs for the City. PurDose Estimated Cost Fundins Source PlanningIStudy $70,000 TIF Total Cost = $70,000 Page 277 CAPITAL PROJECT DESCRIPTION 33161 CIRCULATION SYSTEM STREET PROJECTS - TRAFFIC MONITORING PROGRAM PROJECT NO. PROJECT NAME PROJECT LOCATION MAP: NIA TRAFFMON WOJECT LOCATION: :itywide. 'ROJECT DESCRIPTION: 'erform traffic vehicle counts, analyze and report annually on adequacy 01 :irculation system and identify any intersections or links that fail to meei irowth Management Standards. WOJECT NEED: To ensure that the circulation system meets Growth Management Standards. :INANCING: PurDose Estimated Cost Fundina Source Field CountsIReports $1,364,764 TIF Total Cost = $1,364,764 4nnual Expenditures are approximately $52,000 Page 278 CAPITAL PROJECT DESCRIPTION CIRCULATION SYSTEM STREET PROJECTS - UNDERGROUND DISTRICT NO. 17 NONE PROJECT NO. PROJECT NAME I PROJECT LOCATION MAP: PROJECT LOCATION: Harding Street between Carlsbad Village Drive and Palm Avenue east, an( Roosevelt Street between Carlsbad Village Drive and Magnolia Street. PROJECT DESCRIPTION: 3emoval of overhead electric, telephone and cable lines and appurtenance: and undergrounding of said lines including property service extensions or lortions of Harding Street and Roosevelt Street (SDG&E 20Afunded program), Iesign and installation of new City-owned and maintained street lightins ;ystems on portions of Roosevelt Street and Harding Street. WOJECT NEED: 3nce the existing wood pole mounted street lights are removed due to thc Jndergrounding of the utility lines, portions on Harding Street and Roosevel Street will be left without any street lighting. This request is being made in orde o add a new underground serviced street lighting system. The new system wil allow for an upgraded spacing pattern to meet the needs and requests of thc leighborhoods. =INANCING: Purpose Estimated Cost Fundinq Source Studies & Reports $75,000 Design Construction $100,000 $334.800 Total Cost = $509,800 Innual Operating Cost = $3,726 GCC GCC GCC Undist17 Page 279