HomeMy WebLinkAbout; ; 2002-2003 Budget; 2002-07-01CITY OF CARLSBAD
CALIFORNIA
Operating Budget and
Capital Improvement Program
2002-2003
CITY OF CARLSBAD
CALIFORNIA
Operating Budget and
Capital Improvement Program
2002-2003
City of Carlsbad
2002-03 Operating Budget
and Capital Improvement Program
Mayor
Claude "Buddy" Lewis
City Council
Matt Hall
Ramona Finnila
Ann Kulchin
Julie Nygaard
City Manager
Raymond R. Patchett
Administrative Services Director
James F. Elliott
Prepared by the Finance Department
Finance Director
Lisa Hildabrand, C.P.A.
Website: www.ci.carlsbad.ca.us
Photos on Cover: top left to bottom right: Fire vehicles in front of original fire station (early 1960’s), Twin Inns (1970’s), Carlsbad
High School Junior Varsity cheerleaders (1959), Carlsbad’s Little league (1960’s), Building department Christmas card (1974),
Carlsbad Triathlon professional division swim start (2001), Architectural rendering of Carlsbad City Hall Administration Building
CITY OF CARLSBAD, CALIFORNIA 2002-2003 BUDGET
TABLE OF CONTENTS
Readers Guide to the Budget ....................................................................................................................i
Councils Five-Year Vision Statements......................................................................................................ii
About the City of Carlsbad....................................................................................................................... iii
Organization Chart...................................................................................................................................iv
BUDGET OVERVIEW
City Manager’s Transmittal Letter.........................................................................................................A-1
2002 – 03 Budget Highlights.................................................................................................................A-3
Budget Summary................................................................................................................................A-17
Personnel Allocations .........................................................................................................................A-18
2002 –03 Budget Calendar.................................................................................................................A-20
Budget Awards....................................................................................................................................A-21
OPERATING BUDGET
Overview...............................................................................................................................................B-1
Projected Fund Balances....................................................................................................................B-14
Revenue Estimates.............................................................................................................................B-16
Budget Expenditure Schedule ............................................................................................................B-23
Program Summaries
Policy & Leadership Group
Policy and Leadership Group Summary .....................................................................................B-27
City Council.................................................................................................................................B-28
City Clerk.....................................................................................................................................B-30
City Treasurer .............................................................................................................................B-31
City Manager...............................................................................................................................B-33
Public Information .......................................................................................................................B-35
City Attorney................................................................................................................................B-36
Administrative Services
Administrative Services Summary ..............................................................................................B-37
Administration .............................................................................................................................B-38
Finance .......................................................................................................................................B-39
Purchasing..................................................................................................................................B-41
Human Resources ......................................................................................................................B-43
Workers’ Compensation..............................................................................................................B-45
Risk Management.......................................................................................................................B-46
Health Insurance.........................................................................................................................B-47
Records Management.................................................................................................................B-48
Information Technology...............................................................................................................B-50
Miscellaneous Non-Departmental...............................................................................................B-52
Public Safety
Public Safety Summary...............................................................................................................B-53
Police Department Summary......................................................................................................B-54
Administration .............................................................................................................................B-57
Field Operations..........................................................................................................................B-58
Community Services...................................................................................................................B-59
Canine.........................................................................................................................................B-61
CITY OF CARLSBAD, CALIFORNIA 2002-2003 BUDGET
TABLE OF CONTENTS
Public Safety (Continued)
Investigations/Field Evidence......................................................................................................B-62
Vice/Narcotics.............................................................................................................................B-63
Youth/School Programs..............................................................................................................B-64
Property and Evidence/Records .................................................................................................B-65
Family Services...........................................................................................................................B-66
Task Force..................................................................................................................................B-67
Support Operations.....................................................................................................................B-68
Communications Center..............................................................................................................B-69
Various Asset Forfeiture..............................................................................................................B-70
Bicycle Patrol ..............................................................................................................................B-71
Fire Department Summary..........................................................................................................B-72
Administration .............................................................................................................................B-74
Emergency Operations ...............................................................................................................B-75
Fire Prevention............................................................................................................................B-76
Weed Abatement ........................................................................................................................B-77
Disaster Preparedness................................................................................................................B-78
Community Development
Community Development Summary ...........................................................................................B-79
Administration .............................................................................................................................B-80
Land Use Planning & Planning Commission...............................................................................B-82
Geographical Information System...............................................................................................B-84
Economic Development..............................................................................................................B-85
Building Inspection......................................................................................................................B-86
Housing & Redevelopment Summary.........................................................................................B-87
Affordable Housing......................................................................................................................B-88
Rental Assistance .......................................................................................................................B-89
Community Development Block Grant........................................................................................B-90
Redevelopment Operations Village Area....................................................................................B-91
Low/Moderate Income Housing Village Area..............................................................................B-93
Redevelopment Operations South Carlsbad Area......................................................................B-94
Low/Moderate Income Housing South Carlsbad Area................................................................B-95
Community Services
Community Services Summary...................................................................................................B-97
Library Summary.........................................................................................................................B-98
Georgina Cole Library...............................................................................................................B-100
Dove Library..............................................................................................................................B-101
Genealogy/Local History...........................................................................................................B-103
Centro de Informaćion...............................................................................................................B-104
Technical Services....................................................................................................................B-105
Collection Development & Acquisitions.....................................................................................B-106
Media Services..........................................................................................................................B-107
Adult Learning Program............................................................................................................B-108
Cultural Arts Summary..............................................................................................................B-109
Arts Office .................................................................................................................................B-110
Sister City..................................................................................................................................B-112
Special Events ..........................................................................................................................B-113
Recreation Summary ................................................................................................................B-114
Park Planning & Recreation Management................................................................................B-116
Recreation Fee Supported........................................................................................................B-118
CITY OF CARLSBAD, CALIFORNIA 2002-2003 BUDGET
TABLE OF CONTENTS
Community Services (Continued)
Recreation – Aquatics...............................................................................................................B-120
Recreation – Agua Hedionda Lagoon Permits..........................................................................B-122
Recreation Operations..............................................................................................................B-123
Senior Programs.......................................................................................................................B-125
Public Works
Public Works Summary.............................................................................................................B-127
Administration ...........................................................................................................................B-128
Engineering...............................................................................................................................B-130
Storm Water Protection.............................................................................................................B-133
General Services Summary......................................................................................................B-135
Park Maintenance.....................................................................................................................B-137
Facilities Maintenance...............................................................................................................B-139
Street Tree Maintenance...........................................................................................................B-141
Median Maintenance.................................................................................................................B-142
Vehicle Maintenance.................................................................................................................B-143
Vehicle Replacement................................................................................................................B-145
Carlsbad Golf Course................................................................................................................B-146
Maintenance & Operations Summary.......................................................................................B-147
Street Maintenance...................................................................................................................B-149
Traffic Signal Maintenance........................................................................................................B-151
Street Lighting...........................................................................................................................B-152
Buena Vista Channel Maintenance...........................................................................................B-153
Water Operations......................................................................................................................B-154
Wastewater Operations.............................................................................................................B-156
Solid Waste Management.........................................................................................................B-157
CAPITAL IMPROVEMENT PROGRAM
Overview.............................................................................................................................................C-1
Future Growth.....................................................................................................................................C-2
Revenues............................................................................................................................................C-3
Capital Projects...................................................................................................................................C-5
Capital Projects 2002-03 to Buildout...................................................................................................C-5
Capital Projects – The Next Five Years..............................................................................................C-8
Summary.............................................................................................................................................C-9
Growth Management Plan ................................................................................................................C-10
California Assembly Bill 1600 (AB 1600) ..........................................................................................C-11
Detail Schedule of Capital Projects by Category ..............................................................................C-12
Capital Funds Projected Fund Balances for FY 2002-2003..............................................................C-13
Capital Revenues Actual and Estimated...........................................................................................C-14
Capital Funds Budget Expenditure Schedule ..................................................................................C-15
Capital Improvement Program Analysis of Available Balances 2002 to Buildout .............................C-18
Glossary of Capital Project Funding Sources ...................................................................................C-47
CITY OF CARLSBAD, CALIFORNIA 2002-2003 BUDGET
TABLE OF CONTENTS
APPENDICES
Planned Major Capital Outlay Items 2002 – 2003 ..............................................................................D-1
Out of State Travel Requests 2002 – 2003.........................................................................................D-3
Miscellaneous Statistical Information..................................................................................................D-6
Accounting Systems and Budgetary Control ......................................................................................D-7
Resolution Adopting the Budget .........................................................................................................D-8
Gann Limit Resolution.......................................................................................................................D-11
Glossary............................................................................................................................................D-13
READER’S GUIDE TO THE BUDGET
This budget document has been designed to provide the public concise and readable
information about the City of Carlsbad’s 2002-03 budget. The budget is separated into
three major sections: The Overview, the Operating budget and the Capital Improvement
Program.
Overview
The beginning of the budget document contains the City Manager’s transmittal letter and
overview information. The overview information will provide summary data to the reader
for both the Operating budget and the Capital Improvement Program, as well as
information on personnel allocations and debt management issues.
Operating Budget
The Operating budget section has 7 tabbed sections providing the summary information
and budget information for each of the 6 major service areas. The Operating budget
summary section begins with an overview of the revenue assumptions and the policies
used to develop the budget. The overview is followed by tables providing detailed
information on fund balances, expenditures and revenues. The following sections are
separated by major service areas, which are Policy and Leadership Group,
Administrative Services, Public Safety, Community Services, Community Development,
and Public Works. Within these broad categories, the budget is organized on a
departmental basis. Summaries, financial and descriptive, are included for department
groups containing more than one program. The summary page is followed by detailed
program information. Some departments consist of one program only, and thus only one
page is included for them. For each program, a financial history and the 2002-03 budget
figures are presented. Also included are narrative statements describing program
activities, associated workload measures or performance objectives, key achievements
for 2001-02 and key goals for 2002-03.
Capital Improvement Program
The Capital Improvement Program (CIP) is located in the back of the budget document.
An overview of the CIP provides general information about the process used in
preparing the budget for capital projects and describes how development information is
used to project future revenues that fund these projects. In addition, major CIP projects
are highlighted and discussed. The next section contains summary revenue and
expenditure tables by funding source and a detailed project expenditure schedule listing
the cost and timing of each future and current CIP project. Following this schedule are
fund summary pages, which list the revenues and detail expenditures by fund, thus
providing cash flow information and annual projected fund balances for each capital
improvement program fund.
Appendices
The Appendices contain a detailed listing of the 2002-03 Capital Outlay items by
department. Travel detail is presented next, so that Council may review and approve
these requests. The last section of the Appendices provides information on the Gann
Limit, budget process, accounting system and budgetary control, the adopted Resolution
for the budget, and a glossary.
i
COUNCIL VISION STATEMENTS
ii
Carlsbad City Council
Year 2002
FIVE-YEAR VISION STATEMENTS
City Council continues to clarify and pursue the
vision of Carlsbad that reflects the pride and
quality of life for all who live, work, and play here.
Carlsbad’s. . .
• diverse and healthy economic base provides opportunities for employment to the residents
of Carlsbad, economic vitality to the community, and the necessary revenues to support City
services,
• policies and decisions implement the General Plan, enforce the Growth Management Plan,
maintain the safety and security of its citizens, and are based on what is best for Carlsbad,
• leadership role in local and regional planning issues actively involves confronting
governmental issues at the local, state and national levels, and
• operates an open government for the betterment of the community in a non-partisan manner
while encouraging active citizen participation and involvement with the City Council, and the
City’s Boards and Commissions.
Carlsbad efficiently and effectively. . .
• delivers top-quality public services,
• manages environmental concerns proactively, including:
• open space
• water quality/conservation
• beach erosion
• air quality
• resource conservation and waste reduction
• wildlife habitats
• has a safe and efficient integrated transportation system,
• maintains Citywide “small town” community spirit, and
• has a Community where continuous and life-long learning are supported and embraced for
people of all ages.
ABOUT THE CITY OF CARLSBAD
iii
The City of Carlsbad is a unique coastal
community located 35 miles north of the
City of San Diego surrounded by mountains,
lagoons and the Pacific Ocean. The City is
governed by a five-member City Council
under the Council/Manager form of
government. Although the “village” dates
back more than 100 years, Carlsbad
incorporated in 1952 as a General Law city.
Currently, the City is about two-thirds
developed and is expected to grow from a
population of 88,000 to 117,000 once its 42
square miles are built out. Industries in the
area include a major regional shopping
center, a specialty outlet center, 20 auto
dealers, 31 hotels offering 3,300 rooms for
tourist lodging, high technology, multimedia
and biomedical businesses, electronics, golf
apparel and equipment manufacturers,
several business and light industry parks,
and numerous land developers building
single and multi-family housing in a variety
of community settings.
#
#
#
#
S a n F r a n c i s c o
L o s A n g e l e s
S a n D i e g o
N e v a d a
O r e g o n
C a l i f o r n i a C a l i f o r n i a
P a c i f i c
O c e a n
P a c i f i c
O c e a n
A r i z o n a C a r l s b a d C a r l s b a d
The City provides the full range of services normally associated with a municipality including
police, fire, parks and recreation, library, planning and zoning, building and engineering, various
maintenance services and administration. The City provides water services through the
Carlsbad Municipal Water District, a subsidiary district of the City. The City Council serves as
the Board of Directors for the Carlsbad Municipal Water District. Solid waste collection is
provided through a franchise agreement with a local refuse collection service.
In addition to the usual City services, Carlsbad offers a wide variety of programs to help local
residents and businesses. The City operates the Village Redevelopment agency that
encompasses 0.4 square miles of the downtown area. The South Carlsbad Coastal
Redevelopment area is just south of the Village Redevelopment area and fronts the Pacific
Ocean. In addition to the redevelopment project areas, the agency operates a housing authority
that provides housing assistance to 578 low income families. The City’s literacy program,
funded by the General fund, provides adult education to local area residents. Older Carlsbad
residents receive assistance through the City’s senior citizen programs. Also, the City provides
major support for the Convention and Visitors Bureau and the hiring center.
School programs and facilities are provided by four different school districts located within the
City boundaries. Although the City Council has no direct control over these school districts, the
Council recognizes the importance of quality school facilities and programs to Carlsbad’s
residents. The Council has worked closely with the schools in the past and staff continues to
meet with them on a regular basis
ELECTORATEMAYOR &COUNCILMAYOR &COUNCILArtsCommissionCITY OF CARLSBAD ORGANIZATION CHARTHistoricPreservationCommissionSister CityCommitteeLibrary Boardof TrusteesSerraCooperativeLibrary SystemAdvisory BoardBeachErosionCommitteeCommunityTelevisionFoundationPersonnelBoardTrafficSafetyCommissionUndergroundUtility AdvisoryCommitteeHousing &RedevelopmentCommissionHousing CommissionDesignReviewBoardPlanningCommissionivCITY CLERKCITY CLERKCITYTREASURERCITYTREASURERCITY MANAGERCITY ATTORNEYParks &RecCommissionSeniorCommissionADMINISTRATIVESERVICESPUBLICSAFETYPUBLICWORKSCOMMUNITYDEVELOPMENTCOMMUNITY SERVICESHUMANRESOURCESINFORMATIONTECHNOLOGYPURCHASINGElectedCouncil AppointedStaff SupportReporting RelationshipProgramsKEYRISKMANAGEMENTFIREFINANCERECORDSMANAGEMENTECONOMICDEVELOPMENTGEOGRAPHICINFO SYSTEMSPLANNINGRECREATIONSENIORCENTERHOUSING ANDREDEVELOPMENTLIBRARYBUILDINGARTSADMINISTRATIONENGINEERINGSERVICESPOLICEGENERAL SERVICESMAINTENANCE &OPERATIONS
OVERVIEWOVERVIEW
City of Carlsbad
Office of the City Manager
To the Honorable Mayor and City Council:
2002-03 BUDGET TRANSMITTAL
I am pleased to submit the 2002-03 Operating and Capital Improvement Program
budgets for the City of Carlsbad, which total $178.2 million, with projected revenues of
$174.5 million. Of the total budget, $140.2 million (79%) will be used to finance the
operations of the City while $38 million (21%) will go toward the construction of capital
improvements throughout Carlsbad. Our goal has been to prepare a comprehensive
financial plan for all services, programs, and capital projects, which will assist the Council
in the achievement of its vision for Carlsbad.
As part of the budget process each year, the state of the economy is reviewed to
determine how it may affect the City's revenues for the upcoming year. The past year
has been a rough one, both financially and emotionally. It began with the nation in a
recession and uncertain as to how long and how deep it would go. This was aggravated
by the tragic events of September 11th that, among other things, accelerated the decline
of a tourism industry already feeling the effects of the recession. The drop in tourism
affected both the City's transient occupancy taxes as well as its sales taxes. Finally, in
the beginning of 2002, the seriousness of the State's budget deficit began to come to
light. Hard hit by the declines in stock market-related income, soaring energy prices, and
fading exports, the State is now facing a deficit of about $23.6 billion (30% of its General
fund). At this time, a State budget has not been adopted. The effect of the imbalance in
the State's budget on Carlsbad remains as one of the biggest unknowns this year. City
revenues are at risk.
Despite the hardships of the past year, Carlsbad has continued to experience revenue
growth, with a 5.8% increase in the General fund revenues likely for fiscal year '02. The
recession has been mild and it appears that a slow recovery has begun. Revenue
growth will be modest in the upcoming year with only a 1% increase projected as the
economy continues on its slow, and sometimes bumpy, recovery.
The 2002-03 budget provides funding for a number of new programs and service
enhancements that will allow the City to meet its goals for the upcoming year. The focus
this year is on the continued implementation of the 177 capital improvement projects with
total appropriations for fiscal year 2002-03 expected to exceed $175 million. The
development experienced by the City over the past several years has provided the
funding to expand the park system with the addition of five new parks under construction
over the next five years. The City will also begin work on various road segments that will
greatly enhance the transportation system in the City. A large number of resources in the
operating budget will be dedicated to meeting the development schedule for these and
many other projects contained in the Capital Improvement Program.
One of the results of new development is higher growth in operating revenues. New
houses and businesses mean more property taxes, greater transient occupancy taxes,
additional business license tax as well as increases in a number of other revenue
sources. These help to offset the cost of providing services to the developments. As
the City builds out and development begins to decline, the growth in operating revenues
1200 Carlsbad Village Drive • Carlsbad, CA 92Ae$-1989 • (760) 434-2821 • FAX (760) 720-9461
will also slow. With an aggressive capital improvement program underway, careful
management will be required to insure that the City continues in good financial health as
it adds new facilities and services.
One of the newer systems in place to keep the City financially strong is the Infrastructure
Replacement fund. This system was set up to insure that funds are available when
needed to replace the City's streets, sidewalks and other infrastructure. The city of
Carlsbad is relatively new so it has not yet experienced the significant cost of replacing
the infrastructure as it ages. We are just beginning to experience the high cost of major
repairs on some of our older roads. The Infrastructure Replacement fund will be used to
accumulate funds and pay for the replacement of the City's infrastructure in the future.
This year's budget includes a $3.5 million transfer for this program.
As always, the provision of top quality public safety services is essential to achieving
Council's goals for the City. The needs have been evaluated and the budget
recommends the addition of seven new positions to the police department to maintain
Carlsbad's excellent services.
Over the City's past 50 years, Carlsbad has continued to grow and prosper as a result of
the vision and leadership of the City Council. The Council's commitment to their vision,
and their willingness to provide the funding to achieve it, has resulted in a highly
desirable City in which to live and work. The 2002-2003 operating and capital budgets
continue to provide for a high quality of life for current citizens as well as laying the
groundwork so that future generations will also be able to enjoy the benefits of our
community.
I would like to express my appreciation to the City Council for providing the direction and
support which are crucial to the ability of the City to achieve its goals. I would also like to
recognize the contributions of the City staff for not only creating a successful operating
plan and capital improvement program; but, also for their commitment to providing top-
quality services to all who live, work and play in Carlsbad. Their efforts are critical to the
City's ultimate success. I offer them my thanks for a job well done.
RAYMOND R. PATCHETT
City Manager
June 18,2002
A-2
CITY OF CARLSBAD BUDGET HIGHLIGHTS
CITY OF CARLSBAD
BUDGET HIGHLIGHTS
FISCAL YEAR 2002-2003
WHERE THE MONEY COMES FROM...
Transfers
5%
Taxes
41%
nmental
6%
Other
2%Interdepartmental
7%Licenses & Permits
1%
Charges for Services
11%
Utility Charges
15%
Impact Fees/Special
Taxes
8%Income from
Investments & Property
4%
Intergover
2002-2003
ESTIMATED REVENUES
$174.5 MILLION
WHERE THE MONEY GOES...
Community
Services
8%
Capital Projects
21%
Policy &
Leadership
2%
Public Safety
16%
Admin. Services
9%
Public Works
30%
Non Dept. &
Contingency
6%
Comm. Dev.
8%
2002-2003
ADOPTED BUDGET
$178.2 MILLION
The 2002-03 budget for all City funds totals $178.2 million with total revenues estimated
at $174.5 million. The City’s fiscal year runs from July 1 to June 30. Any amounts spent
in excess of the amount of revenue received will decrease the City’s available fund
balance.
A-3
The operating budget totals $140.2 million and is expected to generate $141.7 million in
CITY OF CARLSBAD BUDGET HIGHLIGHTS
revenues. This budget allocates the resources for the operations of all City programs.
The Capital Improvement Program (CIP) assesses the City’s long-term capital needs
and identifies potential revenue sources to meet these needs. The 2002-03 CIP
contains the current year budget allocation of $38 million and outlines approximately 177
future projects at a total cost of $353.3 million through build-out of the City. Capital
revenues for the 2002-03 fiscal year are estimated at $32.9 million. The capital projects
include parks, civic facilities, as well as all infrastructure needs anticipated for the future
which are not expected to be constructed by developers.
The budget overview on the following pages will provide the reader with a
good understanding of the budget process and the economic profile of the
city as well as with a broad overview of the services and projects planned
for the 2002-03 fiscal year. This section also addresses debt
management including a schedule of the outstanding bond issues. More
detail on the City’s numerous programs and projects can be found
throughout the remainder of the document.
BUDGET PROCESS
The budget process for the
City of Carlsbad begins in
January each year, with a
review and update of the City
Council’s five-year vision
statements. These
statements are shown on the
first page of this budget
document. Through the vision
statements, Council
continually defines and
clarifies their vision of
Carlsbad. The strategic goals
for the City are developed
next. The goals further define
the methods used to achieve
the vision and call out areas
in which Council would like to
place special emphasis
during the year. Once these
are developed, staff develops
operational goals based on
Council’s direction. These
operational goals are the
basis for the development of
the operating budget.
Carlsbad’s operating budget
allocates the revenues
generated through taxes, fees and other charges to the various programs and services
provided by the City to the community. The operating budget is a tool that guides the
achievement of Council’s vision and goals for the City. It allocates the resources and
sets the priorities for all of the programs offered by the City. Thus, it is an integral part of
making Carlsbad a wonderful community in which to live, work and play.
City of Carlsbad 2002-2003 Strategic Goals
Top Quality Services – Be a City that provides exceptional
services on a daily basis.
Transportation – Provide and maintain a multi-modal
transportation system, which includes public transportation, and which
moves goods, services and people through Carlsbad in a safe and
efficient manner that is coordinated with community development.
Balanced Community Development – Be a community that
promotes community spirit, quality neighborhoods, establishes
compatible residential and commercial uses, including entertainment
venues, and manages growth by providing an appropriate balance of
facilities and services.
Parks/Open Space/Trails – Acquire, develop and maintain a
broad range of fiscally responsible recreation and open space facilities
that actively address citizen needs and are consistent with the General
Plan and Growth Management Standards.
Water – Ensure reliable, high quality, diversified potable and
recycled water system leading to a drought-resistant community, in the
most cost effective manner.
Environmental Management – Be an environmentally sensitive
community by focusing on: Clean storm water, sewage collection and
treatment, solid waste and efficient use of energy including alternative
energy.
Finance – Implement proactive strategies that provide and manage
the necessary resources to ensure a high quality of life.
Communication – Ensure that citizens, staff and Council are well
informed, leading to a more responsive government and a higher level
of confidence in government.
Learning – Promote and support continuous learning opportunities
within the community and the City organization.
ECONOMIC PROFILE
A-4
CITY OF CARLSBAD BUDGET HIGHLIGHTS
The state of the economy, both national and local, has been topic of much debate over
the past year especially in light of the tragic events that occurred on September 11,
2001. Even before the terrorist attacks, there were questions of whether the nation was
in a recession, how long it would last, how deep it would be, and how it would affect our
local economy here in Southern California. The terrorist attacks in September and the
resulting war against terrorism made the situation even more tenuous. Now, with some
time behind us, we can look back and talk with more confidence about what has
happened and what is likely for the future.
It appears that the US economy went into recession in early 2001 due to a drop in
business investment, a steep decline in exports, and a dramatic cutback in production
and employment by manufacturers in order to keep inventories down. The terrorist
attacks on September 11th further aggravated these factors causing a steep drop off in
both business and pleasure travel. California followed the nation into the recession
and was hit hard by the high-tech slowdown, declines in stock market-related wealth and
income, soaring energy prices, fading exports, and uncertainties early in the year
associated with threats of rolling blackouts. Hardest hit in California was the Bay Area.
The San Francisco and San Jose regions suffered significant job losses during this time
period, while most of Southern California, with the exception of Los Angeles, saw
modest job growth. The State Department of Finance forecasts that the State’s
economic recovery will pick up as the year unfolds but job growth will likely be modest
for the next few months. Personal income is projected to grow by 3% during 2002 and
6.2% during 2003. Construction, on a statewide basis, will be constrained especially in
the non-residential sector due to high vacancy rates.
For the San Diego region, the worst of the very mild recession seems to be about over.
The leading indicators for San Diego rose 1.2 percent in February, which is the latest
information published by the University of San Diego School of Business Administration
at this time. According to the report, “February’s increase was the third in a row for the
USD Index of Leading Economic Indicators. The breadth of the advance was not very
strong, as only two components were up significantly as opposed to one that was down.
The other three components were unchanged or nearly so. Nevertheless, economists
usually look for three consecutive changes in a leading index as signal of a turning point
in an economy. The move is in line with the previous forecast for a rebound in San
Diego’s economy in the second half of 2002. The outlook is for continued slowing in the
first half of the year, with the unemployment rate hovering in the high 3% to 4% range.
That should fall back into the low 3% range by the end of the year as the local economy
strengthens.”
Through excellent planning
and foresight, and a little bit of
luck, the city of Carlsbad made
it through the year relatively
unscathed by the effects of the
economic downturn afflicting
the nation and the state.
Although revenue growth has
slowed and Transient
Occupancy Taxes (TOT or
hotel taxes) are depressed as
a result of the set backs in the
travel industry, the City’s
General fund revenues are still
expected to grow by 5.8% for
the 2001-02 fiscal year. A
$0
$50
$100
$150
$200
$250
$300
$350
$400
$450
1996 1997 1998 1999 2000 2001
City of Carlsbad
Median SFD Home Prices
In thousands
A-5
CITY OF CARLSBAD BUDGET HIGHLIGHTS
substantial portion of the growth is due to franchise taxes generated from activity at the
Encina power plant. These are discussed fully in the General fund revenues section of
the operating budget overview. Without the increase in franchise taxes, the growth
would have been 2%, which is less than the past few years but still respectable in a
recessionary year. Projections for the 2002-03 fiscal year reflect 5% growth (excluding
the changes in franchise taxes). Most of the increase is in the tax revenues, with lesser
growth in other revenues and declines in the development related revenues.
Carlsbad’s real estate market has continued strong throughout the year despite the
downturn in other parts of the economy. The number of permits issued this year
dropped in half; however, most of the decline was due to a lack of supply rather than a
lack of demand. With supply relatively low, housing prices have continued to escalate.
Median prices for single-family homes averaged $425,000 for calendar year 2001, a
12% increase from the previous year. Total assessed values in the City stand at over
$13 billion, double what they were just 5 years ago. Although this accelerated pace is
expected to level out over the next few years, the City still expects to add about 4,600
more residential units and an additional 4.5 million square feet of commercial/industrial
development over the next five years. The City’s residential housing stock is about 80%
built out with approximately 10,000 housing units remaining to develop over the next 20
ears. y
Commercial and industrial development is also an indicator of job growth in the City.
Carlsbad has been generating about 1,000 new jobs each year for the past 5 years.
Some of the major businesses in town include the Gemological Institute of America,
ViaSat, Invitrogen, Callaway, Taylor Made, Upper Deck, and many others.
Development has brought much needed entertainment and shopping venues to citizens
and visitors a like, as well as generating additional sales taxes to help pay for City
services. Carlsbad is
home to Car Country
Carlsbad – an auto mall,
the Carlsbad Company
Stores – a specialty
outlet center, Plaza
Camino Real – a regional
shopping mall, a Costco
center, and a number of
other local retail stores.
The success of these
centers has provided
Carlsbad with the highest
sales per outlet in San
Diego County.
Development has also
enhanced Carlsbad’s
reputation as a
destination resort for
tourism. The City is host
to a major family theme
park: Legoland, and has
two luxury resorts available for its visitors: the Four Seasons Resort at Aviara and the La
Costa Resort & Spa. There are also a number of other quality hotels and motels in the
City with the most recent additions being the Inns of America, which opened in
December 2001, and the Extended Stay America, which is expected to open in summer
2002. With these new openings, available hotel rooms in the City will total about 3,400.
Source: CALIFORNIA RETAIL SURVEY
A-6
CITY OF CARLSBAD BUDGET HIGHLIGHTS
Taxes generated by the hotels dropped off significantly this year, with the sharp decline
in the tourism industry, but are expected to recover over the next year.
Despite the evidence of a recovery on the way, it does not look like it will happen soon
enough to help the state of California through its budgetary woes. The May revision of
the Governor’s 2002-03 budget reports a projected $23.6 billion deficit through the 2002-
03 fiscal year, or 30 percent of the State’s General fund. While it’s difficult to tell what
the ultimate impact will be on local governments, the last recession has demonstrated
that if the State experiences budget shortfalls, it is likely that local government revenues
will also be impacted.
During the last recession, the State took over $2.5 million from Carlsbad in the form of a
reallocation of property taxes. These taxes were never allocated back to the City. The
Governor’s May Revision recommends eliminating the reimbursement for booking fees
(about $200,000 to Carlsbad), a 3.5% shift of Redevelopment Agency tax increment to
the State (similar to the property tax grab in the early 1990’s), and cutbacks in a number
of other State grant programs. While it would be preferable for the State to balance its
budget without impacting local government, if the State can limit the effects to only those
indicated in the May Revision, the impact on Carlsbad will be minimal. The danger is
that these will not be enough, and that further assaults on City revenue sources will
occur. The most likely candidate is the Vehicle License Fees (VLF).
VLF is collected by the Department of Motor Vehicles on all registered vehicles in the
State of California. It is divided among cities and counties and disbursed to cities mainly
on the basis of population. In the past years, the State gave a tax cut to the citizens of
California by reducing the VLF rate by 67%. At this time, the State is backfilling
(reimbursing) local governments for the loss of this revenue from the State’s General
fund. The May Revision suggests rolling back the tax cut to just 25%, while still
backfilling local governments for their share. However, if the State needs to find another
way to fund their deficit, they may choose not to fund the backfill. If this occurs, the City
could lose anywhere from $1.2 million to $3.3 million.
Regardless of what happens at the State level, Carlsbad is positioned well for its future.
It is the Council’s goal to insure that the City remains in good financial health and there
are a number of steps the City has taken to attain that goal. One of these is the Growth
Management Plan. This plan was adopted by the citizens to insure that all necessary
public facilities were constructed along with development. It also insures that a financing
plan is in place to pay for the facilities prior to the development of the property.
In addition to the Growth Management Plan, the City also prepares a long-term financial
model for both the capital and operating needs of the City. With a growing city such as
Carlsbad, it is imperative that we plan for the impacts of serving new development and
operating new public facilities, as well as planning for the capital needed to build them.
Thus, the City prepares a ten-year operating forecast for the General fund, and a 20+
year Capital Improvement Program. As part of the Capital Improvement Program, the
City annually calculates the amounts needed to pay for the various projects and
calculates the anticipated operating budget impacts. In this way, we can anticipate the
effects of development from both a capital and an operating perspective.
One of the newer initiatives the City has undertaken to assure its financial health is the
development of an Infrastructure Replacement fund. With this fund, the City has begun
to set aside money on an annual basis for major maintenance and replacement of its
infrastructure. Much of the City’s infrastructure is relatively new; thus, the City has not
felt the full impact of maintenance. By setting aside funds now, the citizens of Carlsbad
A-7
CITY OF CARLSBAD BUDGET HIGHLIGHTS
can be assured that the proper maintenance and replacement, when needed, will be
performed on the streets, parks, and many facilities for which the City is responsible.
Carlsbad’s current economic position is an enviable one. The healthy economy over the
past five years coupled with continued low inflation has kept consumer confidence high,
allowing for increased retail sales and tourism. The recession of the past year has been
$0
$10,000
$20,000
$30,000
$40,000
$50,000
$60,000
$70,000
97 98 99 00 01 02e 03e
General Fund - Top 5 Revenues
Property Tax Sales Tax TOT VLF Franchise Fees
In thousands
very mild and recovery appears to be on the way. The Carlsbad Company Stores,
opened in late 1997, has continued to expand and now contributes over $1 million
annually to the City’s sales tax receipts. Legoland contributes to the City’s sales tax
base as well as stimulating the development of new hotels in the area. The effect of the
new development and the demand for housing in Carlsbad is an increasing tax base.
The five major revenue sources for the City: property taxes, sales taxes, TOT, franchise
taxes, and vehicle license fees are expected to provide $66.2 million, or 77%, of the
City’s General fund revenues in 2003. These taxes and fees are the major source of
funding for most of the City’s services and allow the City to live up to its reputation as
one of the premier locations in San Diego County.
For fiscal year 2002-03, the City’s revenue projections reflect a return of consumer
confidence with growth in base sales taxes at about 5.6%. Housing values are expected
to level out; although, any changes in values this year will be reflected in next year’s
property tax receipts. Development is predicted at a rate similar to fiscal year 2002;
again the constraint is based on the limited supply not on the demand. And finally,
tourism is expected to slowly recover over the year with TOT receipts possibly reaching
2001’s level by the end of 2003. More information on all of the City’s revenues and
programs can be found in the later sections of this document.
A-8
CITY OF CARLSBAD BUDGET HIGHLIGHTS
2002-03 OPERATING REVENUES
BY FUND TYPE
$141.7 MILLION
GENERAL
61%
SPECIAL
REVENUE
7%
ENTERPRISE
21%
INTERNAL
SERVICE
9%
REDEVELOP-
MENT
2%
A-9
OPERATING BUDGET
Revenue Projections by
Fund Type
The City’s operations
are divided into various
funds. Each fund has
been established
because of certain
restrictions placed on
the use of the
resources received by
that fund. Any
unrestricted funds are
placed in the General
fund. Estimated
revenues for the City’s
five fund types are
shown on the accompanying graph.
General Fund
The fund receiving the largest slice of the revenues is the General fund, with estimated
revenues of $86 million. The General fund pays for most of the City services available to
City residents. The majority of the General fund revenues (76%) are derived from taxes.
The graph below illustrates the sources of revenue to the General fund.
Property taxes, at
$24.4 million, are the
largest General fund
revenue. The city
receives only about
13% of the property
taxes paid by its
citizens. The
remainder of the tax
goes to the school
districts, the state
and other various
agencies.
Sales tax is the
second largest
source of revenue for
the General fund.
Sales taxes are
estimated to bring in $23.5 million for the 2002-03 fiscal year. Automobile and
department store sales are the most significant contributors to the category of sales tax.
2002-03 GENERAL FUND REVENUES
$86 MILLION
SALES TAX
27%
BUS LIC TAX
3%
LICENSES &
PERMITS
2%
CHARGES FOR
SERVICES
6%
OTHER
REVENUE
5%
TRANSFER
TAXES
1%
PROPERTY TAX
29%
INC. FROM
INVEST & PROP
4%
TRANSIENT
TAX
11%
FRANCHISE
TAX
5%
INTERGOVERN-
MENTAL
7%
Transient occupancy taxes (hotel taxes) are estimated at $9.2 million and are the third
largest revenue source for the City. Franchise taxes, transfer taxes, and business
license taxes make up the remaining $7.9 million in tax revenues collected by the City.
Intergovernmental revenues are revenues collected by the State and other governmental
agencies and allocated to the City based on a formula. Examples of intergovernmental
revenues include motor vehicle license fees, state mandated cost reimbursements and
CITY OF CARLSBAD BUDGET HIGHLIGHTS
homeowner’s exemptions. Intergovernmental revenues are estimated at $6.4 million for
the upcoming year.
Licenses and permits account for $1.6 million of the General fund revenues and include
building permits and other development related permits. Charges for services are
estimated to be $5.3 million, a 7% decrease from last year, and include fees for
engineering, planning, building, recreation, and ambulance services. Development
revenues are expected to be less this year not due to economic restraints but rather
because there are simply less new developments ready to build.
Other revenue sources include charges collected from other departments, fines and
forfeitures, and miscellaneous revenues. Those sources total $4.1 million, or 5%, of the
General fund revenue. Income from investments and property are estimated at $3.7
million, or 4%, of the total revenues.
Special Revenue Funds
Revenues from Special Revenue funds are estimated at $10.6 million for 2002-03.
Funds collected in this category are legally restricted to specified purposes. Examples
of funding resources include donations, grants and special assessments. The types of
functions supported with Special Revenue funds include programs such as Section 8
Housing Assistance, Housing Trust fund, Community Development Block Grants
(CDBG), maintenance and assessment districts and the Storm Water Protection
Program.
Enterprise Funds
Enterprise fund revenues make up the second largest revenue group, totaling $29.8
million. Enterprise funds operate similar to a business in that they charge fees to cover
the cost of their services. Examples of the City’s enterprises include water and
sanitation services and solid waste management.
Internal Service Funds
Internal Service fund revenues, projected to be $12.7 million, are derived from charges
to the City programs that benefit from the services rendered. The funds collected must
be used specifically to support the internal service. Examples of the City’s Internal
Service funds include Liability, Health Insurance, Records Management, Information
Technology, Workers’ Compensation, and Vehicle Maintenance and Replacement.
Redevelopment Agency
Redevelopment Agency revenues, estimated at $2.6 million, come mainly from property
taxes collected within the redevelopment area. Carlsbad has two redevelopment areas.
The original area consists of 204 acres located in the downtown “Village Area” of the
City. The overall goal of the Village area redevelopment project is to create a pleasant,
attractive, accessible environment for living, shopping, recreation, civic, cultural and
service functions through the elimination of blighting influences, and through restoration
and new, private/public development forms which preserve and enhance the existing
character of the Village Area and surrounding community.
The second redevelopment area encompasses the land on which the Encina power
plant is located as well as additional parcels south of the plant. Development of a
master plan for this area will begin in the 2002-03 fiscal year. Funds collected within the
redevelopment areas must be used to repay the debt incurred and administration of the
Agency.
Operating Budget by Program
A-10
CITY OF CARLSBAD BUDGET HIGHLIGHTS
The total operating budget for the City equals $140.2 million, which is 2.7% less than the
2001-02 final budget. The operating budget is categorized by major service area (MSA).
Five MSAs have been identified which represent the key businesses of the City. The
following graph shows the operating budget for each of the MSAs.
2002-03 OPERATING EXPENDITURES
$140.2 MILLION
0
10
20
30
40
50
60
Policy &
Leadership
Admin.
Services
Public
Safety
Comm. Dev.Comm.
Services
Public
WorksIn millionsNon-Dept/
Conting.
Total funding allocated for the Policy and Leadership Group for 2002-03 is $3.7 million.
This MSA encompasses all elected officials and the chief executive offices for the City.
These include the offices of City Council, City Manager, Public Information, City Clerk,
City Attorney, and City Treasurer. A ¾ time Video Production Manager position was
added to expand the City’s communication efforts. In addition, a Volunteer Coordinator
position was added to increase the oversight and coordinate the use of volunteers in the
City.
The Administrative Services MSA, with a budget of $16.8 million, includes finance,
records management, human resources, purchasing, information technology, health
insurance, risk management, and workers’ compensation. These departments mainly
provide services to internal City departments. One new position has been added in the
information technology department to assist with desktop support.
Public Safety services are funded at $28.8 million and include
all the police and fire programs such as police patrol,
vice/narcotics, juvenile diversion and DARE programs, fire
prevention, emergency operations and disaster
preparedness. The 2002-03 budget includes seven new
positions in the police department mainly based upon the
anticipated growth in the City. These positions include a two
patrol officers, a DUI officer, an ID Theft Investigator, two communications officers and a
special events coordinator.
Community Development, with a budget of $14.3 million, provides the services that
A-11
CITY OF CARLSBAD BUDGET HIGHLIGHTS
guide and oversee the planning and development of Carlsbad as depicted in the City's
General Plan. The General Plan is the base document that expresses the goals and
public policy relative to future land use. It acts as a "constitution" for development and is
the foundation upon which all land use decisions are based. Also included under
Community Development are the housing and redevelopment programs. A Planning
Technician Intern position was added to provide employees with career growth
opportunities and to develop a pool of qualified in-house candidates to compete for
vacant planning technician positions as they arise.
Community Services, with a budget of $14.3 million, is made up of the library, recreation,
cultural arts and seniors programs. These programs are provided to a wide range of
people and assist in their education and cultural development. The 2002-03 budget
includes the conversion of 1.75 part time positions in the
library to full time. In addition, the Recreation department is
adding an Office Specialist position to staff the front counter
at the Swim Complex and a Management Assistant position
to oversee the development and distribution of the
Community Services Guide. In addition, with the opening of
Carrillo Ranch Park next spring, the budget includes a
contract curator position to manage the programs at this new
facility.
The service area requiring the largest amount of funds is Public Works with a budget of
$52.5 million. Public works is responsible for the building and maintenance of all of the
City’s infrastructure and facilities and for the provision of utility services. It is comprised
of the engineering, parks, streets, facilities, fleet, water and sewer departments. Two
new positions have been added in Public Works, a Park Maintenance Worker to staff
Poinsettia Park, and a Office Specialist to assist with the Storm Water Protection
Program.
The Non-Departmental and Contingency accounts total $9.9 million and include
programs benefiting the City as a whole such as community promotions, community
contributions, assessment services, transfers to other funds and Council’s contingency
account. Included in the non-departmental group is a $3.5 million transfer to the
Infrastructure Replacement fund. This program sets aside funds for the replacement of
the City’s base infrastructure. The contingency account, which is available to Council
for emergencies and unforeseen program needs that arise during the year, is budgeted
at $2.5 million. This is lower than the amount adopted in the 2001-02 budget. In total,
the contingency account amounts to 2.5% of the General fund budget.
CAPITAL IMPROVEMENT PROGRAM
The City of Carlsbad’s Capital Improvement Program (CIP) is a long-range planning
document, which outlines the expenditure plan for current and future capital projects and
the corresponding revenues to pay for those expenditures. Projects in the CIP consist
primarily of new construction or major maintenance and replacement of City facilities
such as parks, roads, civic facilities such as libraries, police and fire stations, and sewer,
water and drainage facilities. The Capital Improvement Program for 2002-03 totals $38
million in new appropriations. Some of the notable capital projects included in this year’s
budget are described below:
Park Development
• The design of Alga Norte Park located in the southeast quadrant is planned
in 2002-2003. The first phase of development (about 20 acres) will include
A-12
CITY OF CARLSBAD BUDGET HIGHLIGHTS
ball fields, soccer fields, tennis courts, picnic areas and tot lots.
• Construction of Larwin Park located in the northeast quadrant is scheduled.
This 22-acre park will encompass mainly passive uses including trails and tot
lots.
• Aviara Community Park is located in southwest
quadrant. An additional appropriation of $1 million
is included in the budget to begin construction of
this 24-acre park site. The park is planned to
include ball fields, soccer fields, basketball courts,
picnic areas and tot lots, and a community facility.
• Funds are included in the budget to begin planning
and design of the Pine School park site which is
located in the northwest quadrant of the City. An
extensive community outreach program with local
residents and various organizations will be implemented to gather public
input for the ultimate design of the park.
Civic Projects
• ADA projects will receive about $326,000 in funding for improvements at
Cannon Park, Holiday Park, and other locations throughout the City.
• Design of the Coastal Rail Trail will continue. This non-motorized pathway
will be located within the San Diego Northern Railway right-of-way extending
from Oceanside to downtown San Diego and will accommodate bicyclists,
joggers, and roller-bladers. The City expects to receive and additional
$110,000 in grant funding in 2002-03 to pay for the design.
• An additional $264,000 will be added to fund the Village
Public Parking Enhancement Program to increase
availability of parking and examine ways to better utilize
existing parking in the downtown area.
Streets and Traffic Signals
• Construction of several major street projects is included in the CIP, which,
once constructed, will improve the flow of regional and local traffic
throughout the City. Projects receiving appropriations in 2002-03 include
College Boulevard east of El Camino Real and the Rancho Santa Fe
Road widening and realignment project. In addition, next year’s Capital
Improvement Program includes $7.7 million in funding for street maintenance
and/or reconstruction projects.
• There are nine new traffic signals funded in the next fiscal year
at a cost of about $1.2 million. In addition, three older traffic
signals along El Camino Real will be replaced at the intersections
of Plaza Drive, Marron Road, and Hosp Way.
Sewer, Water and Drainage Facilities
• The Vista-Carlsbad Sewer Interceptor project will receive additional
A-13
CITY OF CARLSBAD BUDGET HIGHLIGHTS
funding for construction of an interceptor which will be located inside a
bridge structure across the Agua Hedionda Lagoon. In addition, the CIP
includes funding for the rehabilitation of the North Agua Hedionda
Interceptor.
• The CIP also includes the City’s share of costs for the Encina Sewer
Treatment Plant and related projects to pay for expansion of the sewer
system, flow equalization, and building improvements.
• Drainage facilities along the planned College Boulevard and Cannon Road
extensions are included in the budget at a cost of $2.6 million.
• Construction of waterlines are included in the CIP for the following locations:
College Boulevard from Cannon Road to Carlsbad Village Drive
El Camino Real from Cassia to Poinsettia Lane
El Camino Real from Faraday Avenue to Cougar Drive
• A recycled water system is being
developed to serve the industrial park area,
and to increase the City’s water supply and
reduce dependence on external suppliers.
Funding for the project will come from grants
and loans, which will be repaid from water
sales. The project is estimated to cost
about $37 million once complete. The
appropriations for this project were made
towards the end of 2001-02, and are therefore not included in the total new
appropriations amount.
STAFFING
The 2002-03 budget includes a total of 642.75 permanent positions (both full time and
¾-time positions) and 145.67 part-time positions (in full-time equivalents). This is an
increase of 15.5 permanent positions and 3.27 part-time positions (in full-time
equivalents).
DEBT MANAGEMENT ISSUES
The use of debt has always been a primary issue in the development of the Capital
Improvement Program and the policies to implement the Growth Management Program.
Over the years, the City has issued millions of dollars of bonds and Certificates of
Participation (COPs) to fund streets, buildings, sewer and water facilities, open space
acquisitions and other infrastructure projects. The City is continually evaluating its
outstanding debt as well as potential future issues to insure that interest costs are kept
at a minimum and the use of the bond funds is appropriate.
The following table identifies the debt the City has issued, the outstanding principal, the
2002-03 principal and interest payments and the scheduled year of payoff.
A-14
CITY OF CARLSBAD BUDGET HIGHLIGHTS
City of Carlsbad
Debt Outstanding
Outstanding 2002/03 Final
Repayment Original Principal Payment Payment
Bond Name Source Bond Issue At 6/30/02 P & I FY
1997 Hosp Grove Refunding
Certificates of
Participation
General fund $ 6,595,000 $ 4,515,000 $ 754,351 2009
1997 CMWD Refunding
Certificates of
Participation
Water
Enterprise
$ 7,400,000 $ 2,295,000 $ 1,219,860 2004
1996 Refunding Encina JPA
Sewer Expansion Sewer
Enterprise
$ 11,080,000 $ 8,870,000 $ 936,199 2014
1993 Redevelopment
Tax Allocation
Bonds
Redevelopment $ 15,495,000 $13,540,000 $ 1,043,777 2024
Subtotals $ 40,570,000 $29,220,000 $3,954,187
1997 Reassessment District
College & Alga Assessment
District
$ 18,475,000 $ 10,805,000 $ 1,701,111 2012
1997 Carlsbad Ranch
Assessment
District
$ 10,175,438 $ 9,085,000 $751,898 2023
1998 Rancho Carrillo
Assessment
District
$ 19,600,000 $ 18,835,000 $ 1,745,619 2028
Subtotals $ 48,250,438 $38,725,000 $4,198,628
Totals $ 88,820,438 $67,945,000 $8,152,815
Of the total debt outstanding, only $ 4.5 million will be paid back with General fund
monies. Annual debt service payments from the General fund average approximately
$750,000. The remaining debt will be repaid from water and sewer revenues and from
property owners benefiting from the improvements built with bond proceeds.
In addition to the existing issues, the City is considering using debt to fund several new
projects. These include the following:
Community Facilities District: In May 1991, the property owners approved a Mello-Roos
financing district, called Community Facilities District No. 1 (CFD). Approximately $109
million in capital projects will be financed using this mechanism, most of them without
the issuance of debt. The new city of Carlsbad city hall is scheduled for construction
sometime during the period of 2006-2011. Available CFD cash balances will be used to
pay for the design and construction costs, and if necessary, a bond will be issued to
supplement any deficiency. The project will proceed following a thorough review.
A-15
CITY OF CARLSBAD BUDGET HIGHLIGHTS
Golf Course Construction: In 1994-95 the City acquired a site for a municipal golf course
in the industrial corridor. Funding for the development of the course may be provided
through the use of COPs or other City-issued debt to be repaid from revenue generated
through the operation of the course. Various development options are being considered,
thus, the amount and timing of any debt issue is unknown.
New Road Construction: In order to assist in the completion of various major road
segments, the City is often asked to form financing districts that will spread the costs of
the public improvement over those properties that are benefiting from the improvements
and have them paid over a period of time. The City is considering three such requests
at this time. The requests are to finance the road improvements for the connection of
Poinsettia Lane and El Fuerte, College Blvd. and Cannon Road, and Melrose Ave. and
Faraday Ave. If the requests are approved by the City Council, tax-exempt bonds may
be issued for these projects over the next three years. Repayment of the bonds will
come solely from the property owners within the Financing Districts. It is not anticipated
that the City will have any obligation for the repayment of the bonds from general City
funds.
SUMMARY
The City of Carlsbad has weathered the latest recession with minimal
impact on its residents. There are still a number of uncertainties on
the horizon; however, due to the early planning and foresight by City
Council and residents, the City has a sound economic base from
which to grow.
As the population has increased, so have the resources that allow the
quality of life in Carlsbad to be maintained. Despite the recession, the
majority of the City’s base revenues have continued to grow. The
increased job opportunities from the development of the industrial and
commercial areas is creating a higher demand for housing which will continue to
increase the property taxes. Sales taxes and transient occupancy taxes were boosted
by the opening of the Four Seasons Resort in 1997; the Carlsbad Company Stores, a
specialty retail mall, in late 1997 with an expansion in 1999; Legoland in early 1999; as
well as growth in other hotels and restaurants. Although, the tourism industry declined in
the past year, it is expected that travel will pick back up in the upcoming year. In
addition, the development revenues are providing the funding to pay for the services
provided to the building industry and to offset the cost of capital improvements needed to
serve the growing population.
All of these events add to the diversity and strength of Carlsbad’s economic base that
will provide the funding for additional services needed to maintain the quality of life in
Carlsbad. The requests in this year’s budget reflect the anticipated achievement of
Council’s vision and goals for the City. It allocates the available funding in a manner
that proactively plans for the future. This plan will insure top quality services are provided
to all who live, work and play in Carlsbad.
A-16
BUDGET SUMMARY
FISCAL YEAR 2002-03
PROJECTED PROJECTED
BALANCE ESTIMATED ADOPTED FUND BALANCE
PROGRAM AREA JULY 1, 2002 REVENUES BUDGET TRANSFERS JUNE 30, 2003
OPERATING BUDGET
Policy / Leadership Group $3,714,161
Administrative Services 16,778,882
Public Safety 28,834,461
Community Development 14,250,727
Community Services 14,247,209
Public Works 52,484,180
Non Departmental & Contingencies 9,918,303
SUBTOTAL OPERATING $118,633,100 $141,660,175 $140,227,923 $0 $120,065,352
CAPITAL IMPROVEMENT PROGRAM
Fiscal Year 2002-03 $251,157,244 $32,868,249 $37,971,744 $246,053,749
2001-02 Continuing Appropriations (137,213,712)
$108,840,037
TOTAL OPERATING AND CAPITAL $369,790,344 $174,528,424 $178,199,667 $0 $228,905,389
FISCAL YEAR 2001-02
PROJECTED
BALANCE ESTIMATED ESTIMATED FUND BALANCE
PROGRAM AREA JULY 1, 2001 REVENUES EXPENDITURES TRANSFERS JUNE 30, 2002
OPERATING BUDGET
Policy / Leadership Group $3,175,814
Administrative Services 14,296,329
Public Safety 26,957,755
Community Development 13,039,477
Community Services 12,823,895
Public Works 48,667,092
Non Departmental & Contingencies 6,647,465 (1,500,000)
SUBTOTAL OPERATING $106,030,443 $139,710,484 $125,607,827 ($1,500,000) $118,633,100
CAPITAL IMPROVEMENT PROGRAM
Fiscal Year 2001-02 $244,283,779 $79,015,293 $73,641,828 $1,500,000 $251,157,244
TOTAL OPERATING AND CAPITAL $350,314,222 $218,725,777 $199,249,655 $0 $369,790,344
A-17
ADJUSTED OVER
FINAL PRELIMINARY (UNDER)
BUDGET BUDGET 2001-02
MAJOR SERVICE AREA 2001-02 2002-03 ALLOCATED
POLICY AND LEADERSHIP GROUP
CITY COUNCIL 1 1 0
CITY MANAGER 6 6 0
CITY TREASURER 0.75 0.75 0
PUBLIC INFORMATION 1 2.75 1.75
CITY CLERK 000
CITY ATTORNEY 7 7 0
ADMINISTRATIVE SERVICES
ADMINISTRATION 2 2 0
RECORDS MANAGEMENT 8 8 0
INFORMATION TECHNOLOGY 15 16 1
FINANCE 21 21 0
RISK MANAGEMENT 2 2 0
PURCHASING 6 6 0
HUMAN RESOURCES & WORKERS COMP 10 10 0
PUBLIC SAFETY
POLICE 143 150 7
FIRE 79.75 79.75 0
COMMUNITY DEVELOPMENT
COMMUNITY DEVELOPMENT ADMINISTRATION 3 3 0
BUILDING INSPECTION 13 13 0
ECONOMIC DEVELOPMENT 1 1 0
GEOGRAPHIC INFORMATION 2 2 0
PLANNING 25 25 0
HOUSING AND REDEVELOPMENT 10 10 0
COMMUNITY SERVICES
LIBRARY 46.25 48 1.75
CULTURAL ARTS 4.75 4.75 0
RECREATION 28 30 2
SENIOR PROGRAM 2 2 0
PUBLIC WORKS
ADMINISTRATION 3.50 6.4 2.9
ENGINEERING SERVICES 58.7 60.2 1.5
GENERAL SERVICES 57.25 58.25 1
MAINTENANCE & OPERATIONS 70.3 66.9 (3.4)
FULL AND 3/4 TIME LABOR FORCE 627.25 642.75 15.5
PERSONNEL ALLOCATIONS FOR 2001-02 AND 2002-03
A-18
SUMMARY OF REQUESTED LABOR FORCE BY CATEGORY
2001/02 2002/03 Difference
622 636 14
5.25 6.75 1.5
142.4 145.67 3.27
TOTAL LABOR FORCE 769.65 788.42 18.77
LIMITED TERM EMPLOYEES
INTERNS 2001/02 2002/03 Difference
(0.5)
TOTAL LIMITED TERM EMPLOYEES 5.5 6 0.5
PERSONNEL ALLOCATIONS FOR 2001-02 AND 2002-03 (Continued)
A-19
2002-03 BUDGET CALENDAR
DECEMBER
• Request Capital Project (CIP) submittals
• Set budget policies
JANUARY
• Operating revenue is projected for the General fund
•
•
Operating budget manual is distributed to departments
Budget preparer’s meeting
• Growth projections completed
FEBRUARY
• Departments submit CIP requests to Engineering
•
•
CIP analysis
Draft CIP is submitted to department heads
MARCH
• Leadership Team (LT) reviews CIP
• Departments submit operating budget requests to
Finance
• Finance department analyzes and complies the
operating budget submittals
MAY
JUNE
• LT reviews operating budget
• CIP Budget Workshop May 14 Council meeting
• Preliminary operating budget is sent to the printer
• Operating Budget Workshop June 4 Council meeting
• Citizens Budget Workshop June 13
• Council adopts final budget including: Operating budget,
Capital Improvement Program, and Annual Spending
Limitation June 18 Council meeting
Operating Budget * CIP
APRIL
A-20
BUDGET AWARDS
California Society of
Municipal finance Officers
Certificate of Award
Excellence in Operational Budgeting 2001-2002
Presented to
City of Carlsbad
TMi catlflaM Hcafilia iht uhlevtmtnt ofExctUtnct In OfmOonal Budgeting wtrf rtfleco an oiutUmOag kuJga Jo
m* Ou **1trfyi*t tudgtOxtpncta Iknugk which Ou t*4g* U Imfltmnut.
February 21,2002
i nfni ri iiiiiii n ni iiii nin
Dedicated to Excellence in Municipal Financial Management
California Society of
MunicipaC finance Officers
Certificate of Award
Excellence in Public Communication Budgeting 2001-2002
Presented to
City of Carlsbad
Ttli ctrtlflaat rteognka Iht mdtlntmmt tfExctttnet to PuNlc Communicant* Budgeting mi rtfltta mm *
•oaimml mnm On v»ttrfyi*i MgHlmg fnteo Imnugk trklem Ou tumgml U ImpUmanud.
February 21,2002
Dedicaied to Excellence tit Municipal Financial Management
The City of Carlsbad was recognized by the California Society of Municipal Finance Officers (CSMFO) for Excellence
in Operational Budgeting and Public Communication Budgeting for fiscal year 2001-02. The purpose of these awards
is to set a high standard of professionalism, which will enhance the audiences' understanding of the mechanics of
local government and special districts and to continue to enhance the budget and its process.
The City of Carlsbad believes that its fiscal year 2002-03 budget continues to meet the high standards of the CSMFO
program.
A-21
fi
in
mJ ;l
M
PI
m
mm
m
A-22
Ii
OPERATING BUDGET SUMMARYOPERATING BUDGET SUMMARY
200243 OPERATING BUDGET OVERVIEW
The Operating budget for fiscal year 2002-03 totals $140.2 million with revenues for the year
estimated at $141.6 million. General fund revenues are estimated at $86 million and budgeted
expenditures are $82.8 million.
REVENUE
The following table shows the total operating revenues the City anticipates receiving for 2001-
02, as well as those estimated for 2002-03.
REVENUE SUMMARY
BY FUND TYPE
(In Millions)
PROJECTED $ ESTIMATED
FUND
1.4% $ 1.9 $ 141.6 $ 139.7 TOTAL
4.0% 0.1 2.6 2.5
5.8% 0.7 12.7
REDEVELOPMENT
1.4% 0.4
12.0 INTERNAL SERVICE
-0.9%
29.7 29.3
(0.1) 10.6
ENTERPRISE
10.7
$ 86.0
SPECIAL REVENUE
0.9% 0.8 $ $ 85.2
CHANGE
GENERAL FUND
%
CHANGE 2002-03 2001 -02
Revenue estimates for the Operating budget indicate that the City will receive a total of $141.6
million, a $1.9 million increase over the current year projections. The majority of the increase is
in the General fund, due to projected growth in the major tax revenues, and the Internal Service
funds. These funds, as well as all other funds for the City, will be discussed in more detail
below.
General Fund
General fund revenues provide a representative picture of the local economy. These revenues
are of particular interest as they fund basic City services such as police, tire, library, street and
park maintenance and recreation programs. The table below shows a summarized outlook for
the major General fund revenues.
SIGNIFICANT GENERAL FUND REVENUES
ALES TAX
RANSIENT OCC. TAX
EHICLE LICENSE FEES
LL OTHER REVENUE i (In Millions)
PROJECTED ] ESTIMATED I $ %
2001 -02
$
2002-03 CHANGE CHANGE
22.5 $ 24.4
21.9
$ 1.9 8.4%
8.6
23.5 1.6 7.3%
9.2 0.6
7.4
7.0%
4.1 (3.3) -44.6%
4.6 4.9 0.3 6.5%
4.6 3.7
15.6 16.2 0.6 3.8%
(0.9) -19.6%
$ 85.2 .9% $ .8 $ 86.0
This year it is expected that property taxes will grow to $24.4 million, an 8.4% increase over
the past year. Property taxes tend to lag the rest of the economy as the tax for the upcoming
fiscal year is based on assessed values from the previous January. Thus, the taxes to be
received for fiscal year 2002-03 are based on values as of January 1, 2002. Sales taxes react
much quicker to changes in the economy and thus will typically grow faster in a recovery but
also drop off faster as the economy cools.
Property taxes also have a cap
on how fast they can grow.
This is due to Proposition 13.
the State in 1978. The Proposition 13 was adopted by
proposition limits the growth in
assessed values (and thus
property taxes) to no more
than 2% per year. The value
upon which the tax is based is
only increased to the full
I Property and Sales Tax Growth
' In thousands
IM.000
$25.000
$20.000 t- --__- tSalesTaxes -__
$15,000 .- ""
$10.000
market value upon the sale of
the property. Thus, property
taxes tend to grow slowly unless there is a significant amount of housing activity.
$o~~"-"~-~."~-~~"-~" I
__ ""- __________~.~~~- 93 94 95 96 97 98 99 00 01 OZe 03e ~
In more recent years, we have seen robust growth in property taxes due to new developments
and a large number of resales within the City, spurring revaluation of the parcels. The sale of
the Encina power plant, located along the shore in Carlsbad, is another factor contributing to the
rise in property taxes. With the deregulation of the power industry, San Diego Gas and Electric
sold the electrical generating plant to Cabrillo Power in March 2000. Since the plant was
previously considered Public Utility properly, it was assessed a unitary tax of which the City
received a very small share. Now that it is privately owned, it is locally assessed and taxed
giving the City an estimated $250,000 more in property taxes. During the past year, the State
Board of Equalization modified one of their rules to revert assessment of the power plant back
to the State, thus putting it back into the unitary system. Unless legislative action is taken, the
modified rule will become effective on January 1, 2003. There is a bill pending in the Senate at
this time, which will allow the state to assess the power plant but still distribute the taxes based
on the location of the plant. Unless this bill is passed, the City will lose approximately $250,000
in property taxes next year.
Sales taxes are expected to total $23.5 million for 2002-03, an increase of 7.3% over the 2001-
02 projections. These projections assume a base increase of 5.6% plus additional amounts for
General Reail
30%
31%
Food PrcdUSIs
12%
new retail sites locating to the City. One
of the most significant new sites on the
horizon is a retail center in the southern-
most part of the City. This center may
include approximately 190,000 square
feet of retail space as well as restaurants
and other commercial uses.
As can be seen in the accompanying
chart, the City's sales tax base is heavily
weighted in the transportation section,
which is predominantly new car sales.
B-2
Thirty-seven percent of the sales taxes received come from this source. After the terrorist
attacks in September, it was thought that new car sales may experience a significant decline,
thus, car manufacturers and dealers began offering very lucrative deals to keep car sales up.
The effect has been a strong surge in car sales resulting in continued growth in the City's sales
tax receipts. The projections assume that this trend will begin to slow down over the first half of
2002 and level out as the deals go away and demand diminishes.
Sales tax estimates also include approximately $665,000 that is restricted to spending on public
safety services under Proposition 172. Proposition 172 requires that the one-half cent increase
in California sales taxes be allocated to local agencies to fund public safety services.
The third highest General fund revenue source is Transient Occupancy Taxes (TOT or hotel
taxes) estimated at $9.2 million for 2002-03,
an increase of 7% over 2001-02 estimates. r Transient Occupancy Taxes TOT is the one revenue source for the City 1 In,ho~~
that was severely affected by the September I
terrorism attacks.
The tourism industry was already beginning to
slow due to the downturn in the national and
regional economies; the terrorism attacks
practically shut down the industry for a few 1 t2.m) i
weeks. The recovery from those events has 1
been very slow with a decline of 7% projected
for fiscal year (FY) 2002. Fiscal year 2003's
projected growth to $9.2 million will just bring
TOT back up to the fiscal year 2001 levels. Carlsbad's TOT would have been even lower if not
for the opening of a new hotel this year, the Inns of America, and a new hotel projected to open
in FY 2003, an Extended Stay America. The addition of this new facility will bring the total rooms
available in Carlsbad to over 3,400.
The largest increase in the current year (FY 2002) revenues is in Franchise taxes. Franchise
taxes are paid by certain industries that are using the City right-of-way to conduct their
businesses. The City currently has franchise agreements for cable TV service, solid waste
services, and gas and electric services. The cable and solid waste franchises have been growing along with the growth in population and changes in their rate structures. These
franchise revenues are projected to grow by about 3% in fiscal year 2003. The large increase in
franchise taxes has come from the taxes on gas and electric services, which are paid bv San
__1
01 OZe 03e
flrulY.ar
~ "~i
- ___
SDGE Franchise Taxes Diego Gas and Electric (SDG&E).
SDG&E pays franchise taxes for
which they transport gas and
I an "in-lieu'' franchise tax based on
transported on SDG&E lines but
59 2003 me purchased from another source.
In Milli
$5 I the use of the public land over
u electricity. The City also receives
$1 the value of gas and electricity
Fiscal Year " 1 The "in-lieu'' tax captures the
electricity that is transported using public lands but which would not otherwise be included in the
franchise taxes on gas and
8-3
calculations for franchise taxes due to deregulation of the power industry. The majority of the
“in-lieu” taxes received are attributable to Cabrillo Power, the operator of the Encina power
plant, based on the gas used in the generation of electricity. During the energy crisis in 2000
and 2001, average gas prices soared from about $3 per thousand cubic feet to, at times, more
than $12 per thousand cubic feet. In addition, the Encina power plant was operating at a much
higher capacity. The combination of these two factors resulted in an increase in franchise fees
to the City of over 100% in each of those years. Prices have now dropped back to more
“normal” levels, thus the projection for franchise taxes has been reduced back to 2001 levels, a
decline of $3.3 million.
Vehicle License Fees (VLF) are collected by the Department of Motor Vehicles when cars or
other vehicles are registered. They are calculated on the estimated value of the vehicle and are
distributed to cities and counties mainly based on population. The City’s revenues from this
source grew by about 10% per year from FY 1998 to FY 2001 but are expected to slow to about
a 6.5% increase for FY 2002. The high growth rate was partly due to Carlsbad’s increasing
population and partly to increasing auto sales statewide. Projections for FY 2003 anticipate
well as continued population increases in Carlsbad.
slightly stronger growth, at about 8%, reflecting a recovery statewide in the upcoming year as
Development-related revenues include planning, engineering and building permits, and fees
paid by developers to cover the cost of reviewing and monitoring development activities such as
plan checks and inspections. These revenues are difficult to predict as many of the planning
and engineering activities happen months or years before any structures are actually built.
Development-related revenues increased coming out of the recession as development in the
City picked up and housing demand grew. The City continued to issue a significant number of
building permits in 1997 through 1999; however, the revenues for planning and engineering . __ .. servlces dropped on; thereby,
flattening the total development
revenues received. Based on the
citywide growth projections shown
in the Capital Improvement
Program section of this document,
a 19% decrease in building permit
revenue is expected for the 2002-
03 fiscal year, significantly less
than the decline the previous year
of 56%. Permits issued are
expected to increase slightly in the
years after 2003 but will never
achieve the levels of the late
1990’s.
7 - -
Development Revenues and Permits Issued
$9 1 2.500
2,000
1,500 ,S ._ E 54 = $3 ~~
~~ 1,wo a“
.~ 500
0
Fiscal Year 97 98 99 2,000 01 02e 03e
___” -~ “Revenues +Residential Permits Issua I””
All other revenues include business license taxes, transfer taxes, interest earnings, ambulance
fees, recreation fees, and other charges and fees. The estimate for fiscal year 2002-03 totals
$16.2 million, a slight increase from fiscal year 2001-02.
Business license taxes are closely tied to the health of the economy and show an estimated
5.6% growth rate for 2002-03. There are currently about 6,500 licensed businesses in Carlsbad
with almost 2,000 of them based out of the home. Transfer taxes are expected to continue to
grow reflecting the strong real estate market in Carlsbad and new home development. Interest
Bd
income is projected to increase by 3%, mainly due to increasing balances,
about $3.3 million on its investments every year.
The City earns
Overall, the General fund revenues are expected to grow by about 1%, or $800,000, in the
upcoming year. The growth would have been about 5% if not for the decline in the franchise
taxes. Almost all of the growth is coming from the tax revenues, mainly property taxes and
sales taxes. Although the City had been experiencing revenue growth between 9 and 17% in
the late 1990's, it was not sustainable growth. Much of those increases were due to the opening
of new hotels, restaurants, retail centers, and new home development. As the City matures, it
will be increasingly more difficult to produce double-digit growth in revenues. The 5% gain
(excluding franchise taxes) projected for fiscal year 2002-03 is closer to what may be expected
in the future.
Other Funds
Revenues from Special Revenue funds are expected to total $10.6 million; an increase of
$100,000 from 2001-02. The types of services supported within Special Revenue funds include
programs funded by specific revenue
streams such as grants (Section 8
Housing Assistance, Community
Development Block Grants), donations,
special fees, and assessments (Housing
Trust fund, Maintenance Assessment
districts).
Special Revenue Funds
All Others
4%
Storm Water
Protection
10%
Maintenance
Districts
21%
Section 8
49%
The largest changes in the Special
Revenue funds occurred in two
programs: Storm Water Protection and
the Section 8 Housing. The Storm
Water Protection program was created
to respond to federal mandates to
reduce the pollutants in run-off water
that flows through the City's storm
drains. There is currently no funding
source for this mandated program; so, it is being funded through an advance from the General
fund. For fiscal year 2002-03, $1.1 million has been budgeted for the transfer compared with
$1.9 million in the previous year. Staff will be working over the next year to find a more
permanent method of funding all the requirements of this program. More information on the
program can be found in the section of this letter titled "Expenditures."
The other noteworthy difference was in the Section 8 Housing program. The City received an
additional allocation of 75 vouchers from the federal government for fiscal year 2002-03
resulting in an increase in grant funds of $1.1 million.
One additional change in the Special Revenue funds this year is the recording of the Senior
Nutrition grants and the related program costs in the General fund rather than in a Special
Revenue fund. The Senior Nutrition program is funded from both the General fund of the City
and specific grants received from the Federal government. The grants are approximately
$190,000 per year and will now be recorded in the General fund rather than in a separate fund
so that all program costs can be shown together.
B-5
Enterprise fund revenues for 2002-03 are projected at $29.7 million, up 1.7% or approximately
$500,000. Enterprise funds are similar to a business in that rates are charged to support the
operations that supply the service. Carlsbad
Enterprises include the water, recycled water
and sanitation services, solid waste
management, and the Carlsbad Golf Course.
There are no changes in any of the rate
structures anticipated in next fiscal year and
no significant changes projected for any of the
Recycled otner revenue sources.
Water
7%
Enterprise Revenues
Golf
Solid Course
Waste -^ 2%
2%
_ . ..Sanitation
Water
67%
Included in the estimated revenues for the
Golf Course fund is a $600,000 transfer from
the General fund. The City has been
transferring $600,000 per year to this fund to
assist in financing a future municipal golf
course. Last year the transfer was omitted as
the project was stalled in the permitting
process with the environmental agencies. The City is hopeful that the project will be able to
continue in fiscal year 2003 so the transfer has been reinstated.
Internal Service funds show the estimated revenues of $12.7 million for 2002-03, an increase
of $700,000, or 5.8%, over 2001-02 projections. Internal Service funds provide services within
the City itself and include programs such as the self-insurance funds for Workers'
Compensation, Liability and Health Insurance, as well as Information Technology and Vehicle
Maintenance and Replacement. Departments pay for services provided by these funds, thus
the rates charged for the services are based on the cost to provide the service. The goal of the
Internal Service funds is to match their budgeted expenses with charges to the departments
after allowing for a certain level of reserves within the fund. Explanations for the changes in
these funds can be found in the section of this letter titled "Expenditures."
Redevelopment revenues are expected to total $2.6 million in the upcoming year, a 2.2%
increase over the projections for the previous year. Most of the increase is due to projected
increases in tax increment, which reflect the growth in property taxes within the two established
redevelopment areas. As with most property in California, the growth in assessed values (and
thus property taxes) is limited to no more than 2% per year. The assessed value is only
increased to the full market value upon the sale of the property. Thus, unless there is significant
resale activity or new development, the increment would not be expected to grow more than 2%
per year.
As stated earlier in the discussion of the General fund's property taxes, the State Board of
Equalization recently modified one of their rules to revert assessment of the Encina power plant
back to the State as of January 1, 2003, thus putting it back into the unitary system. There is
legislation pending (Assembly Bill 81), which would allow the distribution of the taxes to remain
at the local level rather than on the unitary tax formulas. While the effect of this legislation on
the General fund is important, it is vital to the feasibility of the newly adopted South Carlsbad
Coastal Redevelopment Area (SCRRA). The power plant is one of the largest tax generators in
the SCCRA, which encompasses the power plant property and the properties south to the Ponto
area. If the property taxes from the Encina plant are reverted to a unitary basis, the
redevelopment area will not get any tax increment from the power plant, severely limiting the
B-6
amount of revenue that can be generated to use for redevelopment. The City is hopeful that
Assembly Bill 81 will be passed prior to the close of this legislative session.
EXPENDITURES
The City’s operating budget for 2002-03 totals $140.2 million, which
represents a decrease of $3.8 million, or 2.7%, from the current 2001-02
budget. This decrease is due to a number of changes within the programs
found in each of the funds. These will be discussed later in this document.
Budaetarv Policies
Budget policies were developed this year under the new process introduced last year. This
process is generally known as “Expenditure Control Budgeting” or ECB. Using this approach,
each department was given a block appropriation containing sufficient funds to provide the
current level of services for the upcoming year. As Carlsbad is a growing city, the block needed
to contain sufficient funds to pay for inflationary increases as well as growth in the customer
base.
For the 2002-03 budget, the block was calculated as follows:
Personnel and Maintenance and Operation costs were calculated using last year’s
adopted budget increased by an inflation factor of 3%, a growth factor of 3% and an
adjustment factor of .5% for a total of 6.5%. . Capital Outlay requests in excess of $10,000 were not included in the block budget.
These one-time items could be requested separately. Approved capital outlay requests
were added to the operating budgets.
All new positions needed to maintain the same service levels are funded from the block
appropriation. Budgets were not to exceed the block amounts and no additional appropriations
are expected during the year except in the case of a significant unanticipated event. Any
amounts that are unspent at the end of the fiscal year will be carried forward in their entirety to
the new fiscal year.
In addition to the block appropriations, budget requests could be made to implement specific
goals or to operate new facilities. If the request was approved, the additional funds were added
to the budget.
The 2002-03 budget reflects the following organizational and structural changes, which will
continue to contribute to the overall effectiveness of the organization:
9 The Seniors program receives grants for the Senior Nutrition Program. In the past, the
revenues and expenses for the Senior Nutrition Program were recorded in a Special
transferred to the General fund in the 2002-03 budget. The amount of the revenues
Revenue fund. In order to simplify the accounting, the revenues and expenses were
estimated for 2002-03 is $202,000.
0-7
Through the application of these guidelines and policies, the 2002-03 operating budget of
$140.2 million was developed. The budget includes funds to enhance the services already
being provided to the community, as well as the addition of several new programs. The
majority of the new programs and increases in services are the result of new facilities,
maintenance of existing facilities, and a continued focus on public safety, technology, and
customer service.
The 2002-03 operating budget includes 15.5 new full-time and three-quarter-time employees, an
increase of 2.5%. The net increase in hourly staff, totals approximately 3.27 full-time
equivalents (FTE). These changes will bring the total City workforce to 642.75 full and three-
quarter-time employees and 145.67 hourly FTE. These and other changes are addressed in
more detail as follows.
New facilities
The City has a large number of major capital projects scheduled to be built over the next five
years. As the City completes some of these projects, the costs of maintaining and operating
these facilities are added to the Operating Budget. This next year Carrillo Ranch Park will be
completed and open to the public. In addition, with the recent purchase of a future City Hall site,
costs associated with that facility have been added to the 2002-03 budget.
Carrillo Ranch Park - The Carrillo Ranch Park is due to open in the spring of
2003. In order to operate this facility, the operating budget includes funding for a
contract curator to create and manage the interpretive programs, supervise and
coordinate exhibit design consultants, schedule and supervise facility use by
lessors for special occasions, and perform the administrative day-to-day
operations. In addition, a part-time 1000-hour position has been added to assist
the curator. Both of these positions are proposed to be two-year limited term positions. During
this time period, the City will investigate and analyze the feasibility of forming a foundation to
operate the park.
There are also costs associated with the maintenance of Carrillo Ranch Park. Since the park
will not be open until the latter part of next year, no new positions have been added, only
amounts to cover contract labor to perform these functions. Once the park is operational, the
park and facility maintenance requirements will be evaluated and requested in the following
year’s budget.
Citv Hall CamDus - In December 2001, the City purchased the former Farmers Insurance
Building located at the corner of El Camino Real and Faraday Avenue, which is in the
geographic center of the City. The building is currently being leased to the former owners.
Over the next year, a facility needs analysis and other information will be gathered to assist
Council in determining the occupants and uses for this facility, as well as the use of any
buildings that are vacated. In the interim, there are costs of maintaining the building including
the site development and the building maintenance have been included in the 2002-03
association dues, landscaping, minor repairs, etc. Both the costs of the initial planning work for
operating budget.
Maintenance of Existing Facilities
additional resources for Poinsettia Park and Hosp Grove Park.
In order to provide better maintenance of our existing facilities, next year’s budget includes
Poinsettia Park - Poinsettia Park is one of the City's busiest parks. Currently, temporary
personnel perform the routine maintenance activities such as mowing edging, trimming, and
restroom cleaning. The 2002-03 budget recommends converting the temporary position to a
full-time Park Maintenance Worker I position. This new position will ensure that the
maintenance activities are performed effectively and efficiently, and that top quality service is
continually provided at this park site and will be available to maintain future facilities at this park
such as the tennis courts and gymnasium.
Hosu Grove Park - The City completed its Community Forest Management Plan in 2002. An
integral part of the plan is the rehabilitation and management program for Hosp Grove. This
program includes removing over 8,000 trees, planting 5,000 trees, installing an irrigation
system, improving soil conditions, and implementing fire prevention measures such as weed
abatement. The Park's budget includes $84,000 for contract labor to implement this program.
In addition, the Fire budget includes a 350-hour part-time position to assist with the fire
prevention portion of this program.
Public Safety
Public safety has always been a top Council priority. As the population of our
City continues to grow, additional public safety staff is required to maintain the
current level of safety services. There are seven new positions included in the
budget this year to continue Council's focus on public safety. These positions
include a two Patrol Officers, a DUI Officer, a Senior Police Officer to serve on
the County's Identity (ID) Theft Task Force, two Communications Officers and a
Special Events Coordinator.
The two Patrol Officers are needed as a result of the increase in population. Driving under the
influence of alcohol has been identified as the cause of a significant number of traffic collisions
in Carlsbad. The addition of an officer specifically designated for this purpose will not only
directly effect DUI enforcement but it will heighten the awareness of all officers as to the
importance of DUI enforcement.
The additional Senior Officer for the ID Theft Task Force will staff a regional task force to
address identity theft, which is a crime that is increasing exponentially with a large number of
victims. The City will be 100% reimbursed by the County of San Diego for this position.
The two Communications Officers requested are the result of a comprehensive overview of
police and fire dispatching performed in 2001-02. One of the conclusions reached in the study
is that the current minimum staffing in the communication center of two is inadequate. The
study recommends that the minimum staffing be increased to three with one of the three
dispatchers dedicated to fire dispatch only. Adding two Communication Officers will bring the
minimum staffing to three during peak periods.
The popularity of special events continues to grow while the responsibility for management of
those events becomes increasingly difficult. Presently, the Traffic Sergeant performs these
duties, which takes up about 75% of his time. A Special Events Coordinator position is being
recommended since it is a less costly position and would allow the Traffic Sergeant to spend
more of his time supervising the Traffic Division. In addition, having an employee whose main
focus is special event planning will result in a higher level of service to applicants and a greater
number of quality special events in our City.
Technology
The City continues to enhance its use of technology in order to reduce
processing costs and increase customer services. This year's budget includes
$105,000 for a new Citywide cashiering system. This would replace the current
outdated system with a state of the art system, which will improve the internal
controls over cash handling, improve accuracy and reporting abilities, and
make paying bills simpler and faster for our customers.
The budget also includes $165,000 to continue the implementation of the Document
Management System (DMS). The Document Management System will reduce the time it takes
staff to research archived documents. The plan for fiscal year 2002-03 is to implement public
access to the DMS. This will allow the public to access and retrieve City documents
electronically. The budget also includes an additional $55,000 for continued implementation of
the Request for Action System, which improves the City's response time to requests from
citizens and customers.
As the City continues to expand its use of technology, the Information Technology (IT)
department must expand its support of all the users of the technology. With the growth of
computers in the last three years, IT has had to use temporary help to keep pace with the
desktop support. The budget recommends replacing the temporary help with a permanent
Application Specialist position.
Customer Service
One of Council's goals is top quality service. In order to provide excellent customer service, we
must have knowledgeable employees with adequate training and experience. Community
Services utilizes a large number of part-time employees to serve their customers. These
employees help cover peak periods (such as summer programs), are available to cover nights
and weekend hours, and are a very valuable resource to these departments. In order to train
and supervise the part-time employees, full-time permanent positions are necessary. The
budget recommends the conversion of 1.75 full-time equivalent part-time employees in the
Library to full-time. These positions, which include a Librarian and a Circulation Supervisor, will
be available to work evenings and weekends and will offer the needed supervisory skills,
education, training, and experience so customer service will not be compromised.
In the Recreation department, a full-time Office Specialist II and a Management Assistant are
being recommended. The Office Specialist is to staff the front counter at the Swim Complex.
Currently the Swim Complex receptionist needs are being covered by a daily rotation of from
three to twelve staff. The inherent lack of accountability and business practice consistency
increases the risk of accounting and customer service errors. The new Management Assistant
position will support the overall customer service of the department. This position will oversee
the development and distribution of the Community Services Recreation Brochure and will
assist with identifying and analyzing the training needs of the Recreation division.
Budqet bv Fund Tvpe
This table ,shows the
changes in the operating
budget for fiscal year 2002-
03 compared to the current
budget for fiscal year 2001-
02. The General fund
contains most of the
discretionary revenues that
BUDGET MpENDrmF!E SUMMARY
BY FUND TYPE
BUDGET
(In Mllllont)
BUDGET
2001-02 $
CHANGE CHANGE 2002-03
%
_.
NND
GENERAL NND $
SPECIN RNENUE
844 5 12.8
82.8 $ (1.6) -1.9%
WlERFfUSE
10.6
30.2 30.3 (2.2)
1.4%
1.7
0.2
-19.0% (0.4) 2.1 FtEDR/ELopMENl
14.8
0.3%
14.6 INTERNAL SERVICE
0.1
-17.2%
TOTAL -2.7% $ (3.9) $ 140.2 $ 144.1
6-10
finance the basic core of City services. However, this should not diminish the importance of the
other operating funds, as they also contribute to the array of services available within Carlsbad.
The remainder of this section will provide more information about the proposed budgeted
expenditures by fund and program.
General Fund
Total budget for the General fund is $82.8 million, which is 1.9 % less than the previous budget
of $84.4 million. The decrease is mainly due to smaller budgets for the non-departmental
accounts and for the Council Contingency account.
I BY MAJOR SERVICE AREA Ill, I I BUDGET
(In Mil
FUND
POLICY/LEADERSHIP
I 2001-02 I$ 3.3
ADMINISTRATIVE SERVICES
PUBLIC SAFETY
5.5
COMMUNITY DEVELOPMENT
26.9
6.3
COMMUNITY SERVICES
PUBLIC WORKS
14.3
15.4
NON-DEPARTMENTAL 8.9
CONTINGENCY 3.8
TOTAL 1% 84.4
T t
The Council Continaencv account, which is
ms)
BUDGET
$ 3.7
2002-03
28.4
5.4
6.2
15.1
14.1
2.5
7.4
$ 82.8
$ I % 1
CHANGE 1 CHANGE
$ 0.4 I 12.1%
available for unanticioated emerclencies or
unforeseen program needs, is budgeted at $2.5 million, or approximateiy 2.5%, of the 2002-03
General fund budget. This is less than the 5% used last year. The Council‘s Contingency
account was budgeted less this year since, under the Expenditure Control budget approach,
fewer budget increases are requested. During 2001-02 less than $200,000 of the contingency
account was used.
Non-departmental expenses include payments for debt service, transfers to other funds, and
administrative and other expenses not associated with any one department. The largest
decrease is $1.5 million in the amount transferred to capital projects. These funds vary from
year-to-year based on the funding needs for the Capital Improvement Program. In addition, the
Infrastructure Replacement fund transfer was increased by $500,000. This amount is budgeted
at about 4% of General fund revenues. We have also reinstated the annual $600.000 transfer
to the Golf Course fund to cover property taxes, assessments, and other costs associated with
the continued planning of the proposed Golf Course.
The remainder of the changes in the recommended General fund budget are relatively minor.
These are addressed below by Major Service Area (MSA).
The Policy/Leadership Group includes all elected officials and the City
Manager’s Office. This budget is essentially the same as last year with
just the Public Information budget growing by $93,000 to fund the Public
Internet access to the DMS mentioned earlier.
Administrative Services’ $145,000 decrease is mainly due the costs of special projects
undertaken in the previous year, which will not be continuing.
6-11
The growth in Public Safety is due, for the most part, to increases in the block budget for
inflation and population growth and the pay off of the 800mHz system. The City entered
into a lease-purchase agreement in 1996 for the 800mHz radio system. With interest
declining in the past year, it now is more economical to pay off the lease rather than
continue the annual payments. Thus, $475,000 has been budgeted in the Fire
department budget to make the payment. All new positions were funded out of the block
budget with the exception of the Special Events Coordinator and the ID Theft
Investigator.
= In the Community Development area, the 2.6% decrease is mainly due to some one-
time costs in the previous year, and an additional $70,000 budgeted for the City Hall
Campus planning and facility needs analysis. . In the Community Services area, the 1.5% decrease is mainly due to some one-time
costs in the previous year, such as the $500,000 budgeted for the Library’s new
automation system. These decreases were offset by the increase from transferring the
Senior Nutrition Program to the General fund and account for the change in this MSA. . Public Works shows a slight decrease of 1.3%. The Parks Maintenance budget was
reduced by $40,000 as a result of the Poinsettia Park synthetic turf project. This project,
due to be completed in the Fall of 2002, is estimated to reduce water costs by
approximately $40,000 annually. Other decreases are due to one-time costs budgeted
in the previous year including $166,000 for the maintenance management system and
$1 10,000 for a traffic signal master plan. . Capital outlay expenses totaling approximately $914,000 have been included in the
General fund budget.
Changes In Other Funds
Special Revenue funds, at $10.5 million, show a decrease in anticipated spending of
approximately $2.2 million, or 17.5%. There are several reasons for the decrease. The Storm
Water Protection Program fund budget decreased by $800,000. Last year’s budget was the first
year of this program and contained over $900,000 in one-time start-up costs. This year’s
budget is mainly comprised of ongoing costs of the program. Another decrease is the result of
the transfer of the $200,000 Senior Nutrition program to the General fund. There was also a
$750,000 decrease in the Buena Vista Channel budget. Maintenance of the channel is done
every three to four years. During Fiscal Year 2001-02, $750,000 was appropriated for this
maintenance project.
Enterprise funds total $30.3 million, which is a slight increase of $131,000, or
.3%. These increases are mainly due to the block budget increases for
inflation and increased customer base. No increase in rates is forecasted for
the next year.
’ The Internal Service funds budgets increased in total by $215,000, or 1.4%.
’’ The Internal Service funds are self-supporting through user charges. The
health insurance budget showed the largest increase and is the result of anticipated increases
in Health Insurance fund rates for the City’s self-insured fund. The Vehicle Replacement fund
budget varies from year to year depending on the need for replacements. A list of the
requested vehicle replacements can be found at the end of this document.
6-12
The Redevelopment Agency budgets have decreased for 2002-03 by a total of $410,000. This
is mainly due to an additional $300,000 budgeted in the previous year for the South Carlsbad
Redevelopment Area master plan. The remaining funds are consistent with the previous year.
SUMMARY
As the City of Carlsbad enters its 50M year, it is evident that the
planning and foresight by the City Council and residents has provided a
sound economic base from which to grow. The increased job
opportunities from the development of the industrial and commercial
areas, as well as Carlsbad’s reputation as a quality city, are keeping the
demand for housing growing, which in turn increases the property tax
base. The continued opening and expansion of the commercial
ventures enhances Carlsbads standing as a destination resort.
C
All of these events add to the diversity and strength of Carlsbad’s economic base, which wil(
provide the funding for additional services needed to maintain the quality of life in Carlsbad. This
year’s budget reflects the anticipated achievement of Council’s vision and goals for the City. It
allocates the available funding in a manner that proactively plans for the future. This plan will
insure top quality services are provided to all who live, work, and play in Carlsbad.
6-13
CIN OF CARLSBAD
PROJECTED FUND BALANCES
OPERAlTNG FUNDS
UNRESERVED PROJECTED
FUND
BALANCE
JULY 1.2W1
ESTIMATED ESTIMdTED FUND BAWNCE
REVENUES EXPENDINRES TRANSFERS JUNE 30,2002
IGENERAL FUND
(SPECIAL REVENUE 1
STORM WATER PROTECTION
POLICE ASSETFORFEITURE
COPS GRANT
WWENFORCEMENTBLDCKGRANT
HWSING SECTION 8
HOUSINGTRUSTFUND
LIBRARY ENDOWMENTFUND
TREE MAINTENANCE
LIBRARY GIFTSIBEQUESTS
STREETLIGHTING
MEDAN MAINTENANCE
BUENA VISTA CRK CHNL MNT
LIBRARY GRANTS (CLsA,PLF)
ARTS SPECAL EVENTS
SENIOR NUTRITION
SENlMl DONATIONS
CDBG ENTlTLEMENTiREHAB
COMMUNITY ACTNITY GRANTS
CULTURAL ARTS PROGRAM
SISTER CITY DONATIONS
60,908,347
518.119
0
409.771
137.489
310,097
5,267,070
269,809
94,534
926,227
1,185,883
102.714
814,718
360.701
73,927
174.452
1.991
1.658
1,073,059
246.204
3.385
ARTS GENERAUGALLERY DONATIONS
TOTAL 12,108,570
135,532
>
[ENTERPRISE 1
WATER WEPATIONS
RECYCLED WATER OPERATIONS
9,430,587
1.147.508
SEWER OPERATIONS 5.386.008
SOLID WASTE MANAGEMENT 3.468314
TOTAL
GOLF COURSE
21.139.958
1,707.481
s
INTERNAL SERYICE
WORKER'S COMP SELF INSURANCE
RISK MANAGEMENT
907.192
HEALTH INSURANCE
2,324.401
74,922
VEHICLE MINTENANCE
RECORDSMANAGEMENT 0
399,809
VEHICLE REPLACEMENT 5.009.331
INFORMATION TECHNOLOGY
10.895.120
2.179.k65
TOTAL
IREDEVELOPMENT 1
VILLAGE OPERATIONS I DEBTSVC 1,098,421
VILLAGE LOWIMOD INCOME HOUSING (119,973)
SCCRA WERATIDNS I DEBT SVC 0
TOTAL
SCCRA LOWlMOD INCOME HOUSING
978.448
0
85,195,000 74,141,962
1,873,190
70,004
895,500
62,000
181.000 263.164
4,240.718
85.000
1,250,000
81,921
980.000 282.221
12,000
18.1%
627.982 601.409
452.827 507.471
843,089
40.0rJ
750,000
3.451
750,000
23.000
0
190,ow
25,687
28,000
178,893
963,OW
12,000
29.160
mmo
961.980
55.000 57.713
11,000 35.000
1.150 965
13.500
10,729.289 -
19.749.000
2.275.000
6,457,000
865.000
29,266,000
110.004 -
849.829
891.825
2.669.220
788.100
1.S6.409
1.700.075
11.993.458
3,746,000
1606.201
354,000
452.028
114.507
2,536.737 -
58,000
9,924.071
19,573,581
1,626,131
6,809,100
286,013
28,526.628
250.000
926.295
1,088,888
2,254.903
1.019.380
1,400,000
1,592,705
12,585,671
4.403.M)O
1.56o.m
1MI.309
90,819
17,463
1,829675
664.162 72,825.527
977.890
525.119
327,607
134,410
319,379
5.964.849
259.809
949,800
105.544
1,278,952
48.070
104.747
(364.162) 0
70.240
66,252
13,098
1.070.356
2,888
222.204
3.570
94.032
12,549,525 P
9,605,186
1.794.474
5,033,908
3.867.501
21,869,330
1,587,451 -
2,127,338
630.726
489.239
(231,280)
355,513
5.309.406
1,521,986
10.202.907 P
(300,000) 843,738
153zO8
2w.720
1365.710
97.044
TOTAL OPERATING FUNDS $106.030.443 $139,710,484 $127,107,827 So 1~18,633.100
8-14
CITY OF CARLSBAD
PROJECTED FUND BALANCES
OPERATING FUNDS
PROJECTED
8AIANCE ESTIMATED FUND BALANCE ESTIMATED
PROJECTED
FUND JULY 1.2W2 REVENUES EXPENDITURES TRANSFERS JUNE M.MO3
(GENERAL FUND 1
ISPEunL REVENUE I
STORM WATER PROTECTION
POLICE ASSETFORFEITURE
COPS GRANT
LAW ENFORCEMENT BLOCK GRANT
HOUSING SECTION 6
HOUSING TRUST FUND
LIBRARY ENDOWMENT FUND
LIBRARY GIFTSIBEQUESTS
TREE MAINTENANCE
MEDlAN MAINTENANCE
BUENAVISTA CRK CHNL MNT
STREETLIGHTING
LIBRARY GRANTS (CLSAS'LF)
ARTS SPECIAL EVENTS
SENIOR NUTRITION
SENIOR DONATIONS
CDBG ENTITLEMENTIREHAB
COMMUNITY ACTWIN GRANTS
CULTURAL ARTS PROGRAM
SISTER CIN DONATIONS
12.625.527
977.690
526,119
327.607
134,410
319,379
5,964,849
269.809
949,800
105.544
1.276.962
46.070
104.747
70.240
0
66.262
13.096
2,605
1.070356
222.204
3.570
06,041,000
1,126,419
55.WO
167.WO
5,324,822
7.WO
8lO.WO
12,000
24,000
637.7~
5S7.043
670.624
140.0W
26.004
0
26,OW
0
710,000
50.000
10.000
1.500
ARTS GENERAL DONATIONS
TOTAL
94,032
12.649.626
16.000
10.612.126 -
{ENTERPRISE
WATER OPERATIONS 9.506.186
RECYCLED WATER OPERATIONS 1,794,474
19,620,000
SEWER OPERATIONS
2.155.000
SOLID WASTE MANAGEMENT
5.033.906 6,565,000
GOLF COURSE
3.667.301 675.000
1,587,461 715,000
TOTAL 21,869,330 29,750,000 P
(INTERNAL SERVICE
WMIKER'S COMP SELF INSUR 630.726 7W.231
RISKMANAGEMENT
HEALTH INSURANCE
RECORDSMANAGEMENT
VEHICLE MAINTENANCE
VEHICLE REPLACEMENT
2,127,330 7W.W9
469,239
(231,2801
3,041,945
355,513
1.030.400
1,551.192
5,309,406 1.704.369
INFORMATION TECHNOLOGY
TOTAL 10,202,907
1,521,965
12,663,446
3,936.300
IREDEVELOPMENT 1
VILLAGE OPERATIONSIDEBTSVC
VILLAGE LWIMOD INCOME HOUSING
SCCRA OPERATIONSIDEBTSVC
SCCRA LOWIMOD INCOME HOUSING 97,044 119.5W
1,365,710 2.593.601
843.738 1,824,601
163.208 374.0W
291,720 475.500
TOTAL -
82,842,152
1.076.419
65.0W
347,541
5,335,969
0
255.163
12.000
95.307
727,159
1,139,441
577,760
1,590
0
31,632
0
769.692
0
50.500
M.WO
4.000
20.000
10.539.413
21.113.628
6,766,912
l.W.416
223,410
300.000
34.310.566
1,063,799
1,487,459
3,063,952
1,162,667
1,623,291
1,667.OW
4,495,634
14,823,822
1,501,860
69,692
97,512
1,711,970
22.906
300.000 76,124,375
1.027.890
516.119
147.066
141.410
6.519.686
308.212
269.809
660.361
34.237
7,333
1,010.145
243.157
66.608
0
91,252
13.098
2,996
1,059,856
2122.34
1.070
12,622.341
90.032
8,112,356
2,045,056
4,849,996
4,318,691
21,308,784
1,982,461
1,339,068
247.156
447,232
(363.567)
5.346.775
63.414
6.042.531
961.631
(300.WO) 666,479
437.516
669.706
1,967,341
193.658
TOTAL OPERATING FUNDS fll6.633.100 $14l.6B0.175 5140227.923 $0 $120,065,352
CITY OF CARLSBAD
OPERAllNG FUNDS
REVENUE ESTIMATES
ACTUAL PROJECTED ESTIWTED
REVENUE
AS % DIFFERENCE
REVENUE OF FY 0102 200102 TO REVENUE
REVENUE SOURCE 200001 200142 PROJECTED 200203 200203
[GENERAL FUND
TAXES
PROPERTY TAX
SALES TAX
TRANSIENTTAX
FRANCHISE TAX
TRANSFER TAX
BUSINESS LICENSE TAX
TOTAL TAXES
INTERGOVERNMENTAL
VEHICLE LICENSE FEES
519,657,514
21.198.728
8,269,484
3.915.978
2,300,387
1,095,037
57,435.104 -
4,318,128
122,500.000
21.930.000
8.800.000
7,382,000
2,460,000
1,000,000
83,872,000
4.600.000
I I
$24,370,000 8.3% 1.870.000
1,553,000
598.000
23,483,000 7.1%
9.198.000 7.0%
4.197.000 43.2%
2,588,000
(3,185,000)
5.6% 138,000
9.7%
1.7%
97.000
1.071.000 -
4,942,000 7.4% 342,000
OTHER
TOTAL INTERGOVERNMENTAL
1326.720
5.544.848 5,838,000
1.338.000 1,484,000 10.9%
488.000
146,000
____
LICENSES AND PERMITS r
BUILDING PERMITS 2,102.477 1.005.000 I 815.000 I -18.9% ~190,000~
OTHER LICENSES & PERMITS 1,308,679
TOTAL LICENSES a PERMITS 3,409,158
900.000
1.905.000
-18.9% (170,000)
-18.9% (380,000)
CHARGES FOR SERVICES
PLANNING FEES 820.456 580,000 I 600,000 I 3.5% 20.000
BUILDING DEPT. FEES
ENGINEERING FEES
AMBULANCE FEES
RECREATION FEES
OTHERCHARGESORFEES
TOTAL CHARGES FOR SERVICES
FINES AND FORFEITURES
AND PROPERW
INCOME FROM INVESTMENTS
~
1.420.181
884.384
1,443,594
1,132,480
889.823
890.000
1.400.000
1,200.000 1.258.000
-
560,000 -18.8% (130.000)
(400.000)
56.000
34.000
6,170,898 5,740,000 -7.0% (402,000)
18,000
1.000,000 -28.6%
4.7%
2.7%
2.9%
1.250.000 1,284,000
620,000 -
763.881 830,000 2.9% 24.000
4,081,918 3,960.000 -5.7% (225,000)
INTERDEPARTMENTAL CHARGES 2.147.717 2d00.000 8.7% 2O0,OOO 2,500,000
OTHER REVENUE SOURCES 1.312.367 650.000 7.7% 50,000 700.000
TOTAL GENERAL FUND 80,845,489 85,195,000 1.0% 846,000 88,041,000
B-16
OPERATING FUNDS
QTY OF CARLSBAD
REVENUE ESTlMATES
ACTUAL PROJECTED
REVENUE SOURCE
REVENUE REVENUE
200041 200142
SPECIAL REVENUE FUNDS
STORM WATER PROTECTION
TRANSFER FROM GENERAL FUND 0 1,873,190
INTEREST 0
0
0
1.873.190
POLICE ASSET FORFEITURE
~
ASSET FORFEITURES 88.727 45.000
INTEREST
TOTAL
28.299
115.025
25,000
70,000 ________
COPS GRANT
STATE FUNDING (AB3228) 0 157.000
TOTAL
INTEREST 11.752
11.752 181.000
14.000
LAW ENFORCEMENT BLOCK GRANT
STATE GRANT 158.872
INTEREST
OP TRANS IN
TOTAL
87.429
4.111 7.000
7.492
170,575 81,921
9,592
HOUSING - SECTION 8
INTEREST 6,870 0
FEDERALGRANT
OTHER
TOTAL
3,243.788
19.872
4,250,000
0
3,270.108 4,250,000
HOUSING TRUST FUND
INTEREST 524,320 250.000
INCLUSIONARY HOUSING FEES 1,858,958 730.000
TOTAL
OTHER 5.546 0
2,388,822 980.000
LIBRARY ENDOWMENT FUND
INTEREST 15.481 12.000
DONATIONS
TOTAL
0 0
15.461 12.000
LIBRARY GIFTSBEQUESTS
GIFTSIBEOUESTS
INTEREST
27,000
TOTAL 26,222 29,180
2,180
21.821
4,501
ESTIMATED
PROJECTED 200243 200243
OF FY 0142 200142TO REVENUE
AS % DIFFERENCE
1,076,419 d2.5% (796.771)
-33.3% (18,000)
0.0% 0
-21.4% (15,000) -
40.0%
-4.2% l7.000)
(7.000)
-7.7% (14,000) -
-100.0% (67.429)
0.0% 0
-100.0% (7,492)
-91.5% (87,429)
0.0% 0
1.074.822
0
25.3% 1,074,822
25.3%
0.0%
20.0% 50.000
30.1% (220,000)
0.0% 0
-17.4% (170,000)
0.0% 0
0.0% 0
0.0% 0
-22.2% (5.000)
38.9% 840
-17.7% (5.160)
CITY OF CARLSBAD
OPERATING FUNDS
REVENUE ESTIMATES
ACTUAL PROJECTED AS % ESTIMATED
REVENUE REVENUE OF FY 0102 REVENUE 200102 TO
DIFFERENCE
200041 200102 PROJECTED 200203 200203
385.629 0
-100.0% (3.481) 0 31.977 3.461
0.0% 0 0
417.606 3.461 -100.0% D- (3,4611
77,785 50,000
(38.641) 49.1% 40.020 78.561 45,615
4.0% (2.000) 48.000
465,882 417.321 10.2% 42,379 459.700
9,738
8,000
671.283
82.000 82.000 90.000
627,982
9.8%
637.720 1.6% -
418,996
13,503
417.321
3,000
19.4% 80.840 498,161
0.0% 0 3,000
REVENUE SOURCE
LIBRARY STATE GRANTS (CLSA. PLF)
GRANTS
TOTAL
INTEREST
TREE MAINTENANCE
INTEREST
MISC. REIMBURSEMENTS
TREE MAINTENANCE FEES
INTERDEPARTMENTAL
TOTAL
MEDIAN MAINTENANCE
INTEREST
MEDIAN MAINTENANCE FEES
OTHER
TOTAL
STREET LIGHTING
INTEREST
INTERDEPARTMENTAL
STREET LIGHTING FEES
OTHER
TOTAL
BUENA VISTA CREEK CHNL MAlNT
INTEREST
BUENA VISTA FEES
TOTAL
ARTS SPECIAL EVENTS
INTEREST
DONATIONS
TOTAL
SENIOR NUTRITION(2)
GRANTS
DONATIONS
TOTAL
479,613
47,114
452.827
32,506
____
10.4% 3,376
18.6% 84.216 -
105.260
38.499
65.000
38,500
635.191 674,612
60,000
4.7% 31.997 706.609
0.0% 0 38,500
-7.7% (5.000)
119.542
898.492 843.069
64957 0.9%
3.3% 27.555
558
68,502 40,000 0.0% 0
99,971
40.029 249.8% 99,971
22
68.524
29 344727.6%
i - -
5.255 3.000 0.0% 0
5.000
5.000
36.813
42.068
20.000
23,000
25.0%
21.7% -
110,716 100.000 0.0% 100
212,752
102.035 90,000 0.0%
190,000 -100.0%
(90.000)
(190.000) -
0-1 a
CIM OF CARLSBAD .
OPERAlING FUNDS
REVENUE ESTIMATES
ACNAL PROJECTED DIFFERENCE
REVENUE REVENUE REVENUE OF FY 0102 200102TO
REVENUESOURCE 200001 200102 PROJECTED 200203 200203
SENIOR DONATIONS
INTEREST 13,890 8,000 -37.5% (3.000) 5.000
OTHER
DONATIONS
TOTAL
34,110 20,000 20.000 0.0% 0
63.090 0
111,090 28.000 -10.7% (3,000)
CDEG ENTITLEMENT/REHAB
INTEREST 17,703 25.000
OTHER
-20.0% (5,000) 20,000
52.698 23,000 73.9% 17,000 40.000
GRANTREVENUE
TOTAL
452,891 915.000 -22.4% (205.000)
523.292 963,000 -20.0% (193,000)
COMMUNITYACTIVITYGRANTS
INTEREST
TOTAL
91.042 58,000
91.942 55.000
~
4.1% (5.000)
50.000 -9.1% (5.000)
CULTURAL ARTS PROGRAM
INTEREST 21.931
TOTAL 21,931
11.000
11.000
.S,l% (1.000)
.S,l% (1,000)
ARTS GENERALIGALLERY DONATIONS
INTEREST 11,820 5,000 4.000 .20.0% (1.000)
DONATIONS
TOTAL 108,151
94,341
13,500
8,500 41.2%
18.5%
3.500
2,500
SISTER CITY DONATIONS
INTEREST 329 ZOO 200 I 0.0% 0
DONATIONS
OTHER
TOTAL
2,322
300
2,951
950 1,300
0 0
36.8% 350
0.0% 0
1.150 36.8% 350 1.800 P
TOTAL SPECIAL REVENUE FUNDS 9,643,671 10.729.289 10,612,128 -1.1% (117.161)
8-19
CITY OF CARLSBAD
REVENUE ESIMATES
OPERATING FUNDS
ACTUAL PROJECTED
REVENUE REVENUE
REVENUE SOURCE 200041 IENTERPRISE FUNDS
200142
WATER OPERATIONS
WATER SALES
READY TO SERVE CHARGES
PROPERTYTAXES
NEW ACCOUNT CHARGES
BACK-FLOW PROGRAM FEES
PENALTY FEES
INTEREST
ENGINEERING 8 PLAN CHECK FEES
SERVICE CONNECTION FEES
ENGINEERING OVERHEAD
AGRICULTURAL CREDITS
OTHER
TOTAL
12,047.253
3,498.140
1.371.335
129,633
184.415
98.736
817.528
127,617
84,704
196,479
167.757
12,550,000
3,880,000
1,385,000
129,000
100.000
639,000
190.000
29,000
300,000
181.000
162.000
18.882.943
159.346
19.749.000
504,000
~
RECYCLED WATER
WATER SALES 1,078,229 1,191.000
READY-TO-SERVE CHARGE
RECYCLED WATER CREDITS
INTEREST
OTHER
TOTAL
80.982
284.341
108,161
18.128
1,567.821
82,000
517,000
470.000
15.000
2.276.000 -
SANITATION OPERATIONS
SERVICE CHARGES
LATERAL CONNECTIONS
PRE.TREATMENTCHARGES
ENGINEERING OVERHEAD
PENALNFEES
INTEREST
OTHER
TOTAL
5,826,618
27.500
53.479
236.964
51,578
485,649
6.496.298
14.512
5.800.000
28.000
54500
253,000
48.500
280.000
13,000
6,457,000 ____
SOLID WASTE MANAGEMENT
~
INTEREST 278,533
RECYCLING FEES (AB930) 227.297
PENALTY FEES
NONJURISDICTIONAL FEES
STATE GRANT
OTHER
TOTAL 785,752
184,000
224.000
0 28.000
208.000
23.000
193 0
665,000
255.453
24.278
____
GOLF COURSE
TRANSFER FROM GENERAL FUND 600,000 0
TOTAL
INTEREST 219.250
819.250
1lO.OOO
110,000
TOTAL ENTERPRISE FUNDS 28.552.064 29,256,000
ESTIMATED
REVENUE
200203
12,843.00C
3.8M.00C
1.399,OOC
129,OOC
103.OOC
18O.OOC
680,OOC
28,OOC
309.00C
178.000
158.000
19.620.000
(49.000
1.274.000
84,000
555,000
227,000
2.155.000
15,000 -
5.936.000
28.600
56,600
260,000
49,400
242.000
6,585.000
13,400
185.000
232,000
210.000
25,000
23.000
675.000 -
600.000
715.000
115,000 -
28,750,000 ____
AS %
OF FY 0102
DIFFERENCE
200102 TO
PROJECTED 200203
2.3%
2.4%
293.000
84,000
1.0% 14,000
0.0% 0
3.0%
5.3%
3.000
6.4%
9.5%
3.0%
(10,000)
41,000
(1,0001
-2.8% (5.0001
9.000
-2.5% (4.000)
-109.7% (553.000)
4.7% (129,000) ”
7.0% 83.000
2.4% 2,000
7.4% 38,000
51.7% (243,000)
0.0%
5.3%
0
(120.000)
2.3%
2.1%
136.000
600
2.0% 1.100
2.8%
1.9%
4.9%
3.1%
2.0%
7.000
900
(18,ooo)
400
128,000 -
0.5% 1.000
3.6%
4.9% ~1.0001
8,000
1.0% 2,000
0.0% 0
0.0%
1.5% 10.000
0
”
0.0%
4.6%
600.000
8 605.000
5.000
1.7% 494.000
-
B-20
OPERATING FUNDS
CrrY OF CARLSBAD
REVENUE ESTIMATES
ACTUAL PROJECED
REVENUE REVENUE REVENUE OF FY 0102 200102 TO
DIFFERENCE
REVENUE SOURCE 200001 200102 PROJECTED 200203 200243
\INTERNAL SERVICE FUNDS 1
WORKERS COMP SELF-INSURANCE
INTEREST 166.302
INTERDEPARTMENTAL 536.979
110.000
539.829
100.000 -9.1% (10.000)
800.231 11.2% 60,402
OTHER
TOTAL 757.210
53.929
649,828 700.231
0.0% 0
50.402 -
LIABILITY SELF-INSURANCE
INTEREST 238.822 150,000
INTERDEPARTMENTAL 727,473 741,825
OTHER 265,640
TOTAL
-33.3% (50.000)
-19.1% (141,816)
0 0.0%
1,231,935 891.825 -21.5% (191.816)
0
"
HEAlTH INSURANCE
INTEREST 30.287 24,000 -16.7% (4.000)
INTERDEPARTMENTAUREIMB.
OPERATING TRANSFER IN
2,565,651
74,000
-100.0%
TOTAL 2,669,938
0.0% 0.0%
372,725
2,645,220 14.2%
0
2,669,220 14.0% ____ "
RECORDSMANAGEMENT
INTEREST 0 0 0 I 0.0% 0
INTERDEPARTMENTAL 0 788.100
TOTAL 0 788.100
30.7%
30.7%
242.300
242,300 -
VEHICLE MAINTENANCE
INTERDEPARTMENTAL 1,366,182 1,428,409
INTEREST 43,940
OTHER
OPERATING TRANSFER IN
TOTAL 1,606,172 1.548.409 d6.3% 2,783
0
1.481.192 3.7% 52.783
0.0% 0
-50.0%
0.0%
20,000 20.000
148,650 100.000 50.000
47,400 0
(5o.ooO)
VEHICLE REPLACEMENT
INTERDEPARTMENTAL 1,344,083 1.460.075 I 1,464,368 1 0.3% 4.294
INTEREST
OTHER
TOTAL
426.402
369.125
2,139,610
240,000 0.0% 0
0
1,700,075 1.704.369 4.294
INFORMATION TECHNOLOGY L
INTEREST
INTERDEPARTMENTAL 3,205.000
158.325
3.M6.000
100.000
3,835.300
100,000
5.2%
0.0% 0
189,300
OTHER
TOTAL 3,401.MO
38.315
3.746.000 3,935,300
0.0% 0
188,300
TOTAL INTERNAL SERVICE FUNDS 11,806,505 11.998.458 5.6% 669.988 12.663.446 c
B-21
OPERATING FUNDS
CITY OF CARLSBAD
REVENUE ESnMATES
ACTUAL PROJECTED
REVENUE REVENUE REVENUE
REVENUE SOURCE 200041 200142 IREDEVELOPMENT FUNDS
200243
VILLAGE OPERATIONS /DEBTSERVICE
TAX INCREMENT
RENTAL INCOME 178,404 23.185
1,645.726 1,455,000
ADMINISTRATIVE FEES
INTEREST
66,416 42.616
OTHER
52.022 82,900
37,124 2.500
1.488.oOc
17.68:
42.616
12.300
4.00C
OPERATING TRANSFER IN 280.000
TOTAL 2,259,692 1,606.201
VILLAGE LOW AND MOD INCOME HSNG
TAX INCREMENT
INTEREST
OTHER
60,000
4,000
TOTAL 527.440 364.000
393,823
130.465
3.152
300,000 310.000
60.000
SCCRA OPERATIONS I DEBT SERVICE
TAX INCREMENT 0 452829 485500
INTEREST
TOTAL
0
SCCRA LOW AND MOD INCOME HSNG
TAX INCREMENT
INTEREST
TOTAL
AS % DIFFERENCE
OFFYO142 200142TO
PROJECTED 200243
-23.7% (5.500)
2.3% 33.000
0.0% 0
-12.8% (10,600)
60.0% 1.500
0.0% 0
1.2% 18.400 -
3.3% 1D.DOO
0.0% 0
0.0% 0
2.8% 10,000 "
3.0% 13.471
0.0% 10.000
0 - 23.471
3.1% 3.493
100.0% 1.500
4,993 4.4% -
2.2% 56.884
TOTAL OPERATING $133,634,861 $139,710,484 $141,660,175 1.4% $ 1,949,691 I
6-22
CrrY OF CAREBAD
OPERATING FUNDS
BUDGET EXPENDITURE SCHEDULE
mow2
199900 2wo41 ESTIMATED 2W1.02
DEPARTMENT ACTUALS ACTUALS EXPENDITURES BUDGET
GENERAL FUND
POLICY AND LEADERSHIP GROUP
CITY COUNCIL 229.049 233,983 283.151 286.734
CITY MANAGER 916,669 969.130 1.146.982 1,171,971
PUBLIC INFORMATION 0 218.613 323.545 378.236
CITY CLERK m1.092 88.558 274,640 321,932
CITYATORNEY 704.593 775.468 1,005,701 1,019,697
CITYTREASURER 114.715 114,675 141,795 155,529
TOTAL POLlCYlLEADERSHlP GROUP 2,166,318 2.410.427 3.175.814 3,336.099
ADMINISTRATIVE SERVICES
ADMINISTRATION 270,700 499,413 473.381 761.424
FINANCE 1,299,324 1,385,831 1,747,000 1,926,048
PURCWSING 429,997 504,140 618.052 664.678
HUMANRESOURCES 1,081.146 1,081.139 1,707,217 2,177,120
RECORDS MANAGEMENT (1) 682,170 1261,230 0 0
TOTAL ADMINISTRATIVE SERVICES 3,703,337 4,731,753 4,545,650 5329,270
PUBLIC SAFETY
~~~
POLICE
~~~ ~~~
12,876.387 13,841,287
FIRE
TOTAL PUBLIC SAFETY
8,561,067 9,556,920
21,437.454 - 23398,187
COMMUNITY DEVELOPMENT
COMMUNITYDEVELADMIN 449.671 406.232
GEOGRAPHIC INFORMATION 316,162
ECONOMIC DEVELOPMENT
262,476
161.252 133.875
PLANNING 2,265,048 2246.992
BUILDING
TOTAL COMMUNITY DEVELOPMENT
1.724.91 1 1.736257
4,917.044 4,847.832 -
COMMUNITY SERVICES
LIBRARY 4,175.824 6,266,112
CULTURAL ARTS PROGRAM 495,054 645,654
RECREATION 3,136,029 3.409.515
SENIOR PROGRAMS
TOTAL COMMUNITY SERVICES
339.062 366.497
8,145,969 10,887,778 -
10,092,318
10,455273
26,547,591
402,336
277.993
183,328
2.817.780
2.043.646
5,725,083
7214,932
637.308
4.078.321
429.440
12,360,001
16,092,318
10.834.138
26.920456
504,522
335.559
223,406
3,225.019
2.054.898
6,343,404
8,521,550
721.333
4,549,385
487,440
14,279.714
-
200203
BUDGET -
298.551
1,129,967
864.593
303,076
952.336
165.636
3.714.161
- -
714.140
2.016.098
690.770
1,963,843
0
5.384.851
-
=
16,971,861
11.450.059
28,421,920
- -
480,810
305.658
250,132
3267,587
1,873326
6,177,713
- -
8,059,193
710.195
4,558,457
736,425 - 14.084.270 -
MNCR (DEC)
0102BUD
TO
0243 BUD
3.4%
4.6%
128.6%
-5.9%
8.6%
6.5%
11.3% -
8.2%
4.7%
3.9%
-9.8%
0.0%
-2.6%
5.5%
5.7%
5.6%
4.7%
-8.9%
12.0%
1.3%
8.8%
-2.6% -
-5.4%
-1.5%
0.2%
51.1%
-1.5%
8-23
CITY OF CARISBAD
OPERATING FUNDS
BUDGET EXPENDITURE SCHEDULE
200142
199940 200041 ESTIMATED 200142
DEPARTMENT ACTUALS ACTUALS EXPENDITURES BUDGET
PUBLIC WORKS
PUBLIC WORKS ADMIN 612.698 488.41 1 510,738 637,915
ENGINEERING 4,516302 4,328,589 4.929.358 5.328.591
PARK MAINTENANCE 2,357,387 2.562.480 2.693.051 3.410.009
STREET MAINTENANCE 2,011,672 2,041,517 2,306,888 2.710.977
FACILITIES MAINTENANCE 1,856,329 2,068,387 2.33O.WO 2.579327
TRAFFIC SIGNAL MINT 425,493 743.584 610.345 698.632
TOTAL PUBLIC WORKS 11,780,091 12.232.908 13.640378 15.365,651 -
NON-DEPARTMENTAL
COMMUNITY PROMOTION (CCVB) 369.972
BEACH PARKING 0
COMMUNITY CONTRIBUTIONS 11,460
HIRING CENTER 76.673
HOSP GROVE PAYMENT 800,000
PROPERTY TAX ADMIN FEE 228.157
DUES &SUBSCRIPTIONS
MlSClTRANSFERS OUT
33,535
ASSESSMENT SERVICES
652.949
13,095
INFRASTRUCTURE REPLACE TRANS 2,000,000
GOLF COURSE TRANSFER 600,000
TRANSFER TO CIP f,OOO.OOO
TRANS TO STORM WATER PGM 0
MANAGEMENT INCENTIVE PAY 0
OTHER 37.761
11,821,602 TOTAL NON-DEPARTMENTAL -
370,279
0
0
82.583
800,WO
255.619
40.993
106,400
15.073
3,000,000
600,OMI
4,300,000
0
0
496,000
0
62.000
83.975
800,000
271,000
40.000
0
20.000
3.000.WO
0
1.5W.000
1.873.190
0
507,959
38,000
82.120
85.849
800.000
250.000
65,600
0
46,000
3.0W.000
0
1.5w.000
1,873,190
97.020
61.529 1,300 442.794
8,632,476 8.147.465 8,786,532
SUBTOTAL GENERAL FUND 64,031,815 87,941,361 74,141.982 80,567,126
CONTINGENCIES 0 0 0 3.814.590
TOTAL GENERAL FUND 64,031,815 67,841,361 74.141.982 84.381.716 ""
-
200243
BUDGET -
807,075
5,268,844
3.205.497
2.504.087
2.692.076
685,355
15.160.934
- -
363.000
38,000
11.235
85,849
800,000
325,000
62.400
0
58,400
3,500,000
m.wo
0
1.076.419
500.000
0
7,418,303
- -
80,342.152
2,5w,ooo -
82.842.152 -
lDlNCR (DEC)
0142BUD
TO
0243 BUD
26.5%
-1 2%
4.0%
-7.6%
4.4%
-1.9%
-1.39/.
-28.5%
0.0%
86.3%
0.0%
0.0%
30.0%
4.9%
27.0%
0.0%
16.7%
100.0%
-100.0%
42.5%
415.4%
0.0%
-15.6%
-0.3%
-34.5%
-1.8%
8-24
CITY OF CARLSBAD
OPERATING FUNDS
BUDGET EXPENDITURE SCHEDULE
200102
1999-00 2wo-01 ESTIMATED 2001-02
DEPARTMENT ACTUALS ACTUALS EXPENDITURES BUDGET
(SPECIAL REVENUE FUNDS
STORM WATER PROTECTION PGM 0 0 895.500 1,873,189
POLICE ASSET FORFEITURE 145,562 36,497 62.000
COPS FUND
130,602
106,868 146.268 263.164 263,164
LAW ENFORCEMENTBLOCK GRANT 111,991 79.929 65.000 217,006
HOUSING SECTION 8
HOUSING TRUST
2.832.087 3,185,288 4240.718 4.754.778
487,618 176,351 262.221 282.221
LIBRARY ENDOWMENT FUND 8.751 8.673 12,wo 12,000
LIBRARY GIFTSBEQUESTS 48,506 21.024 18.150 106.280
LIBRARY STATE GRANTS (3) 285.344 299,837 0 0
AV INSURANCE FUND (3) 39.174 0 0 0
TREE MAINTENANCE 519,656 547,853 604.409 876,260
MEDIAN MAINTENANCE 443.055 529.532 507.471 535.634
STREET LIGHTING 760.888 843.737 750,ow
BUENA VISTA CRK CHNL MNT
1.124.106
8.924 7,176 750,000 751,500
ARTS SPECIAL EVENTS 26.584 19.199 26,687 33.566
SENIOR NUTRITION (2) 209,687 210,762 178.893 197.925
SENIOR DONATIONS 120.065 87.860 136,ZW 136.200
CDBG ENTITLEMENTIREHAB 556,294 524.192 961,980 1,419,299
COMMUNIN ACTlVlN GRANTS 34.022 49.351 57.713 65.000
CULTURAL ARTS PROGRAM 33.269 22.808 35,000 48,000
SISTER CIN DONATIONS 700 2,880 965 5.566
ARTS GEWGALLERY DONATIONS
TOTAL SPECIAL REVENUE FUNDS
21.597 38.537 56,WO 147.904
6,800,852 8,837,734 9,924.071 12,780,200
ENTERPRISE FUNDS
WATER OPERATIONS 77,322,265 17.874.678 19.573.381 20,735,913
RECYCLED WATER OPERATIONS 1,527,181 1,315,999 1,628.134 1.662.132
SANITATION OPERATIONS 5.344.785 6,018,104 6,609,100 7.136.902
SOLID WASTE MANAGEMENT 148.676
GOLF COURSE
260.658 266.013 294,448
196,059 144.330 250.WO 349.750
TOTAL ENTERPRISE FUNDS 24336,966 25,613,767 26,528,626 30.179.145 -
INTERNAL SERVICE FUNDS
WORKERS COMP SELF INSURANCE 759.144 952,286 926.295
RISK MANAGEMENT
1.018.717
1.082.140 792.113 1,088,888
HEALTH INSURANCE
1,359,375
2,767,012 2,343,086 2,254,903
RECORDS MANAGEMENT (1) 0 0 1,019,380 l,M10.004
2,628,700
VEHICLE MAINTENANCE 1,482,277 1,586,803 1,592,705
VEHICLE REPLACEMENT
1,786,105
1.005.368 1.079.331 1,400,000
INFORMATION TECHNOLOGY
1,540,171
2,278,075 2,937,523 4,403.500 5,185.167
TOTAL INTERNAL SERVICE FUNDS 9,354,016 9,671.142 12.685.671 14,606,239
%INCR (DEC)
01-02BUD
2002-03
1.076.419
65,000
347,541
0
5,335.989
255.163
12.000
95,307
0
0
727.159
577.780
1,139,441
1.590
31,632
0
0
769,892
60.500
20,000
4,000
46.5%
-17.5%
42.5%
-50.2%
32.1%
-100.0%
12.2%
-9.6%
0.0%
-10.3%
0.0%
0.0%
7.5%
7.9%
1.4%
-99.8%
5.6%
-100.0%
-100.0%
-45.8%
4.9%
58.3%
-26.1 %
21,113,828 1 .8%
1,904,416 14.6%
8,768,912 6.2%
223.410 -24.1%
300.000 -14.2%
0.4% J 1,063,799 6.4%
1.487.459 9.4%
3,063,952 17.3%
1,182,667 8.5%
1,823,291 2.1%
1,667,000 6.2%
4,495,634 -13.3%
14,823,622 1.5%
CITY OF CAREBAD
OPERATING FUNDS
BUDGET EXPENDITURE SCHEDULE
200162 -1 01-02BUD
%INCR (DEC)
199960 MOO61 ESTIMATED 2001-02 I M02-03 I TO
DEPARTMENT ACTUALS ACTUALS EXPENDITURES BUDGET BUDGET 0263 BUD
IREDEVELOPMENT
VILLAGE OPERATIONS I DEBT SVC 3,780,315 2.221.511 1,580,884 1,594.361
VlLlAGE LOWIMOD INCOME HSNG 2,126,428
1.501.860
74,014
-5.8%
80.819 113.772 89.692 -21.2%
SCCRA OPERATIONS I DEBT SVC 0 0 160,309 30d.099 97.512 -73.2%
SCCRA LOWNOD INCOME HSNG 0 0 17.403
TOTAL REDEVELOPMENT 5,912.741 2.295.525 1.829.475 2.102.103
-23.3%
-18.6%
[TOTAL OPERATING FUNDS 110,638.390 112,359.529 127,107.827 144,051,403 140227,923 -2.7%
(2) Senior Nutrition Grant was moved lo the General fund in 200203.
(1) Records Management was convened to an internal Service fund in 200162.
(3) The revenue5 and expenses far these programs were transferred to the General fund.
6-26
PROGRAM:
FUND:
PROGRAM GROUP:
POLICY AND LEADERSHIP GROUP
VARIOUS
VARIOUS SUMMARY
PERSONNEL
MAINTENANCE & OPERATIONS
CAPITAL OUTLAY
GRAND TOTAL
FULL TIME POSITIONS T :, , . ,'
HOURLY/FTE POSITIONS
1999-2000
ACTUAL
1,505,677
642,611
18,030
2000-01
ACTUAL
1,570,077
806,255
34,095
2001-02
BUDGET
1,823,388
1,498,711
14,000
2,166,318) 2,410,427) 3,336,099
" •: > 14,50
0,50
. 14.75
0.50
15:75
0.00
2002-03
BUDGET
2,148,680
1,485,481
80,000
3,714,161
~ ' 17.50
0.00
Public
Information
23%
City Treasurer
4%
City Attorney
26%
City Council
8%
. City Manager
31%
City Clerk
8%
B-27
PROGRAM:
FUND:
PROGRAM GROUP:
CITY COUNCIL
GENERAL
CITY COUNCIL ACCT NO. 0010110
PERSONNEL
MAINTENANCE & OPERATIONS
CAPITAL OUTLAY
GRAND TOTAL
EULLTliETOSlTIDNS' ' , ,' ,"* .'•
HOURLY/FJE'POSITIONS -,
1999-2000
ACTUAL
158,014
71,036
0
229,050
" • - 1,00
" ' •' ' 0.00
2000-01
ACTUAL
167,611
66,372
0
233,983
-1.00
0.00
2001-02
BUDGET
184,245
104,489
0
288,734
. 1,00
o.oo
2002-03
BUDGET
191,988
106,563
0
298,551
1.00
' 0.00
PROGRAM GROUP DESCRIPTION:
As the legislative body of the City, the Council establishes the policies and regulatory ordinances under which the
City operates. The Council has defined goals and objectives to guide the allocation of City resources to meet the
needs of the community through the policy development process.
PROGRAM ACTIVITIES:
Meeting Attendance
• Prepare for and attend City Council Meetings, as well as various regional committee and community meetings.
Respond to the needs and requests of the residents of Carlsbad through personal contact and correspondence.
KEY GOALS FOR 2002-2003:
Top Quality Services
• Be a City that provides exceptional services on a daily basis
Transportation
• Provide and support a multi-modal regional and local transportation system, which includes public transport, and
which moves goods, services and people through Carlsbad in a safe and efficient manner that is coordinated
with community development.
Balanced Community Development
• Be a community that promotes community spirit, quality neighborhoods, establishes compatible residential and
commercial uses, including entertainment venues, and manages growth by providing an appropriate balance of
facilities and services.
Parks/Open Space/Trails
• Acquire, develop and maintain a broad range of fiscally responsible recreation and open space facilities that
actively address citizen needs and are consistent with the General Plan and Growth Management Standards.
Water
• Ensure reliable, high quality, diversified potable and recycled water system leading to a drought-resistant
community, in the most cost effective manner.
Environmental Management
• Be an environmentally sensitive community by focusing on: Clean storm water, sewage collection and
treatment, solid waste, and efficient use of energy including alternative energy.
Finance
• Implement proactive strategies that provide and manage fiscal resources effectively to ensure a high quality of
life.
B-28
PROGRAM: CITY COUNCIL PAGE TWO
FUND: GENERAL
PROGRAM GROUP: CITY COUNCIL ACCT NO. 0010110
KEY GOALS FOR 2002-2003 (Continued):
Communication
• Ensure that citizens, Council and staff are well informed, leading to a more responsive government and a high
level of citizen confidence in government.
Learning
• Promote and support continuous learning opportunities within the community and the City organization.
SIGNIFICANT CHANGES:
None.
B-29
PROGRAM:
FUND:
PROGRAM GROUP:
CITY CLERK
GENERAL
CITY CLERK ACCT NO. 0010210
PERSONNEL
MAINTENANCE & OPERATIONS
CAPITAL OUTLAY
GRAND TOTAL
F^ltTf ME POSITIONS,, ; '• >
HOURkY/FTE:POSmONS
1999-2000
ACTUAL
95,104
97,862
8,126
2000-01
ACTUAL
10,456
85,360
2,742
201,0921 98,558
, - , 0.00
0.00
0,00
0.00
2001-02
BUDGET
10,500
311,432
0
321,932
,0.00
0.00
2002-03
BUDGET
13,010
290,066
0
303,076
~> , 0.00
0.00
PROGRAM GROUP DESCRIPTION:
The City Clerk is responsible for performance of duties as defined in the State Government Code, the State
Elections Code and the Carlsbad Municipal Code. The City Clerk is also responsible for the provision of minutes for
the City Council, Water District Board of Directors, Housing and Redevelopment Commission, Public Improvement
Corporation, and Industrial Development Authority. The City Clerk is an elected position.
PROGRAM ACTIVITIES:
Election Administration
• Serve as the City's Election Officer, responsible for the administration of all Regular and Special Municipal
Elections, prepare all necessary documents in accordance with the Elections Code and coordinate with the
Registrar of Voters.
Political Reform Act Filing Administration
• Serve as the City's Filing Officer for all filings required by the Political Reform Act of 1974. This includes
notification of those required to file, provision of appropriate forms and receipt and review of Campaign
Statements and Statements of Economic Interests.
Record Of Proceedings
• Maintain accurate records of the proceedings of the legislative bodies as required by the Government Code,
including the following: City Council, Municipal Water District Board, Housing and Redevelopment Commission,
Public Improvement Corporation and Industrial Development Authority.
WORKLOAD STATISTICS:
CY/2000 CY/2001
Elections
General
Special
Filings
Campaign Statements
Statement of Economic Interest
Minutes
Council Minutes
CMWD Minutes
H + R Minutes
PIC Minutes
1
0
21
424
101
41
18
1
0
0
20
428
93
27
12
0
Claims Filed
Public Hearing Notices
Ordinances Published
Meetings Held
Council
CMWD Board
H&R Commission
Public Improvement Corporation
CY/2000 CY/2001
130 111
39
29
101
41
18
1
45
52
93
27
12
0
SIGNIFICANT CHANGES:
None.
B-30
PROGRAM:
FUND:
PROGRAM GROUP:
CASH MANAGEMENT
GENERAL
CITY TREASURER ACCTNO. 0010310
PERSONNEL
MAINTENANCE & OPERATIONS
CAPITAL OUTLAY
GRAND TOTAL
FULLTIME POSITIONS
HOURLY/FTE POSITIONS
1999-2000
ACTUAL
56,544
58,170
0
2000-01
ACTUAL
61,257
53,418
0
2001-02
BUDGET
66,440
89,089
0
2002-03
BUDGET
70,888
94,750
0
114,714J_ 114,675) 155,529] 165,638
,0.75
0.00
0.75
0.00
0,75
0.00
0.75
0.00
MISSION STATEMENT:
The Office of the City Treasurer has the mission of providing professional cash management for the City of Carlsbad
and all of its agencies, including among others, the Carlsbad Municipal Water District and the Carlsbad
Redevelopment Agency.
PROGRAM ACTIVITIES:
Cash Management
• Develop projections of cash receipts and cash expenditures from various City and external sources.
• Maintain records of cash receipts and cash disbursements into the Treasury.
• Retrieve daily on-line bank statements and return check listing, verify receipt of anticipated deposits, ensure that
all checks paid by the bank were valid City checks.
• Transfer cash daily into or out of the general checking account to ensure that appropriate balances are
maintained for the anticipated activity of the next day.
• Execute all electronic wires of funds, ensuring that all are signed by authorized personnel and are supported by
proper documentation.
• Develop contracts for cost-effective banking, both retail and custody services.
• Arrange for lines of credit and short-term loans as needed.
• Develop, maintain and ensure compliance with all Treasury internal controls.
Investment Management
• Develop and maintain the City's Investment Policy and present annually, or as necessary, to the City Council for
approval. Incorporate in the investment policy any changes in the City's financial requirements that affect
investments. Ensure compliance with the California Government Code.
• Develop and maintain a pool of investments for the City and its agencies.
• Research daily the financial markets and the financial forecasts.
• Determine daily the type of investments that should be made, considering the current cash position and financial
markets. Determine the dollar amount of the investment and the desired maturity date.
• Solicit telephone bids from approved financial institutions/brokers for available investments.
• Evaluate investment alternatives and effect investment purchases. Prepare trade authorizations and arrange
for payment, delivery and safekeeping of all purchases. Verify receipt and correctness of investments made.
• Maintain record for all investments and investment income.
• Reconcile the custodian's monthly report of investments held with Treasury records.
• Arrange for collateral contracts as required.
B-31
PROGRAM: CASH MANAGEMENT PAGE TWO
FUND: GENERAL
PROGRAM GROUP: CITY TREASURER ACCT NO. 0010310
PROGRAM ACTIVITIES (Continued):
Reporting and Oversight
• Develop and present to the City Council monthly reports of investment activities.
• In a timely manner, disclose to the City Council any information that could potentially threaten the safety and
liquidity of the investment pool.
• Develop and present to the City Council annual reports summarizing and analyzing the financial markets and
the portfolio performance for the past fiscal year. Compare the past fiscal year with the four preceding fiscal
years to provide perspective.
• Develop investment data for the City's Comprehensive Annual Financial Report.
• Develop investment data for the City's annual financial audit conducted by an independent auditor.
• Develop agenda, convene, conduct, and record proceedings of the Investment Review Committee each quarter,
or more frequently as needed.
WORKLOAD STATISTICS: (Est.)
FY1999 FY 2000 FY2001 FY2002
• Portfolio Balance (millions of $) 299 323 367 390
• Number of Investments in Portfolio 1,565 1,712 1,734 1,463
Investment Activity 262 220 266 265
(transactions per month)
• Number of Checks Cleared 14,820 14,639 14,010 14,437
KEY GOALS FOR 2002-03:
Finance
• Anticipate and meet the changing investment needs of the City in order to optimize investment returns,
consistent with maintaining safety of principal, and ensuring sufficient liquidity.
Learning
• Offer speaking engagements on City cash management and investments.
• Further develop the Treasury page of the City's web site, informing the community of the mission of the Office of
the Treasury, the City's Investment Policy, and investment activities. Use the web site as a forum to receive and
respond to community comments and questions.
SIGNIFICANT CHANGES:
None.
B-32
PROGRAM:
FUND:
PROGRAM GROUP:
CITY MANAGER
GENERAL
CITY MANAGER ACCT NO. 0011010
PERSONNEL
MAINTENANCE & OPERATIONS
CAPITAL OUTLAY
GRAND TOTAL
FUIlL TIME PQSJIIQNS „,:-,, ,-',
HOURLY/FTE POSITIONS ••'"'
1999-2000
ACTUAL
604,514
303,969
8,386
916,869
.: ' "„ -6J5
V ; 0.00
2000-01
ACTUAL
689,626
248,151
31,353
2001-02
BUDGET
745,157
423,814
3,000
969,130| 1,171,971
6,00
0.00
6.00
0,00
2002-03
BUDGET
769,646
360,321
0
1,129,967
* 6.00
0.00
PROGRAM GROUP DESCRIPTION:
The City Manager's Office houses the general administrative function of the City. The department's budget includes
the costs for the City Manager, the Assistant City Manager (who also serves as the head of the Community Services
Major Service Area) and the related support staff. The City Manager is generally responsible for the achievement of
the organization's goals that support the City Council's strategic goals.
PROGRAM ACTIVITIES:
Financial
• Promote sound financial practices and a balanced revenue expenditure basis.
Administration
• Provide timely and reasonable responses to citizens and customers.
Policy Development
• Assist Council in policy development.
PERFORMANCE MEASURES:
The City Manager's Office is generally measured by the overall success of the organization in accomplishing the
organizational goals of the City.
KEY GOALS FOR 2002-03:
Top Quality Services
• Be a City that provides exceptional services on a daily basis
Transportation
• Provide and support a multi-modal regional and local transportation system, which includes public transport, and
which moves goods, services and people through Carlsbad in a safe and efficient manner that is coordinated
with community development.
Balanced Community Development
• Be a community that promotes community spirit, quality neighborhoods, establishes compatible residential and
commercial uses, including entertainment venues, and manages growth by providing an appropriate balance of
facilities and services.
Parks/Open Space/Trails
• Acquire, develop and maintain a broad range of fiscally responsible recreation and open space facilities that
actively address citizen needs and are consistent with the General Plan and Growth Management Standards.
B-33
PROGRAM: CITY MANAGER PAGE TWO
FUND: GENERAL
PROGRAM GROUP: CITY MANAGER ACCT NO. 0011010
KEY GOALS FOR 2002-03 (Continued)
Water
• Ensure reliable, high quality, diversified potable and recycled water system leading to a drought-resistant
community, in the most cost effective manner.
Environmental Management
• Be an environmentally sensitive community by focusing on: Clean storm water, sewage collection and
treatment, solid waste, and efficient use of energy including alternative energy.
Finance
• Implement proactive strategies that provide and manage fiscal resources effectively to ensure a high quality of
life.
Communication
• Ensure that citizens, Council and staff are well informed, leading to a more responsive government and a high
level of citizen confidence in government.
Learning
• Promote and support continuous learning opportunities within the community and the City organization.
SIGNIFICANT CHANGES:
None.
B-34
PROGRAM:
FUND:
PROGRAM GROUP:
PUBLIC INFORMATION
GENERAL
PUBLIC INFORMATION ACCT NO. 0011012
PERSONNEL
MAINTENANCE & OPERATIONS
CAPITAL OUTLAY
GRAND TOTAL
FUttlTlME-POSfTjONS ". „ > - • ,,*., ..j-
HOUMLY/FTE POSITIONS
1999-2000
ACTUAL
0
0
0
2000-01
ACTUAL
0
218,613
0
2001-02
BUDGET
68,400
309,836
0
0| 21 8,61 3| 378,236
, . , . ,0.00
0.00
, 1.00
o.oo
, 1.00
0.00
2002-03
BUDGET
395,984
388,609
80,000
864,593
2.75
0.00
PROGRAM GROUP DESCRIPTION:
The Public Information Officer (PIO) is responsible for helping coordinate the dissemination of information regarding
various City programs. The PIO position and its related costs are housed in the City Manager's Office, which is
responsible for the general administrative functions of the City.
PROGRAM ACTIVITIES:
Customer Service
• Provide the citizens and customers of Carlsbad with more comprehensive information regarding services and
opportunities available throughout the City.
KEY GOALS FOR 2002-03:
Top Quality Services
• Provide the citizens and customers with information regarding City programs and opportunities.
• Continuously update citizens and customers on the progress of City programs and policies.
Communication
• Create a comprehensive approach to Citywide communications.
SIGNIFICANT CHANGES:
In order to improve the City's ability to Communicate with citizens, the Public Information Officer position was
converted to a Communication Manager and a % time Video Production Manager was added. Costs were also
included in this budget to allow public internet access to the Document Management System.
In addition, a Volunteer Coordinator Position was added to increase the oversight and coordination of volunteers in
the City.
B-35
PROGRAM:
FUND:
PROGRAM GROUP:
CITY ATTORNEY
GENERAL
CITY ATTORNEY ACCTNO. 0011210
PERSONNEL
MAINTENANCE & OPERATIONS
CAPITAL OUTLAY
GRAND TOTAL
FULt TIME. POSITIONS, . '.'....
HOURL-y/FT-E POSITIONS
1999-2000
ACTUAL
591,501
111,574
1,518
704,593
6.00
. . 0.50
2000-01
ACTUAL
641,127
134,341
0
775,468
6.00
0.50
2001-02
BUDGET
748,646
260,051
1 1 ,000
1,019,697
. 7.00
0.00
2002-03
BUDGET
707,164
245,172
0
952,336
7.00
0.00
PROGRAM GROUP DESCRIPTION:
Provide legal advice, assistance and guidance in accomplishing and implementing the Council's goals to:
• Ensure the effective and efficient delivery of top-quality services to our community
• Develop and implement proactive strategies to ensure the financial health of the community and the City
• Integrate a comprehensive and efficient transportation system, recognizing Carlsbad's essential role in the
region, with quality-of-life centered land use decisions
• Enhance educational opportunities for all segments of the Community.
PROGRAM ACTIVITIES:
• The City Attorney's Office provides legal advice and representation to the City Council, Housing and
Redevelopment Commission, Carlsbad Municipal Water District, City Clerk, City Treasurer, City Manager,
Boards and Commissions, and other City offices in order to provide services to the public as required or
permitted by law. The City Attorney is also responsible for assisting in the interpretation, administration and
enforcement of laws and regulations, and City programs.
• Draff and review all resolutions, ordinances, contracts, bonds, and other legal documents.
KEY GOALS FOR 2002-03:
Top Quality Services
To provide quality and timely legal advice to all elected and appointed City officials and all major service areas,
assisting them in making sound legal decisions to carry out the goals of the City Council including:
• Develop a strategic plan for the City Attorney's Office.
• Implementation of creative legal methods to accomplish strategic and operational goals.
• Offer education and training on relevant law to City staff.
• Manage litigation so that risk/exposure is reduced or minimized to an acceptable level.
SIGNIFICANT CHANGES:
None.
B-36
PROGRAM:
FUND:
PROGRAM GROUP:
ADMINISTRATIVE SERVICES
VARIOUS
ADMINISTRATIVE SERVICES SUMMARY
PERSONNEL
MAINTENANCE & OPERATIONS
CAPITAL OUTLAY
GRAND TOTAL
FULLTIME-POSITIONS,, , -••".-,-.
HOURLY/FTE POSITIONS
1999-2000
ACTUAL
3,497,609
6,980,977
171,123
10,649,709
, 54.00
. 2.00
2000-01
ACTUAL
4,225,250
7,779,333
139,176
12,143,759
- * , 63,00
1.50
2001-02
BUDGET
4,679,050
11,670,533
856,200
2002-03
BUDGET
5,046,706
11,544,776
542,100
17,205,783j_ 17,133,582
64,00
2.50
65,00
3.50
Records
Management Admin. Finance
Information 7% 4% 12%
Human
Health
Insurance
18%
Risk
Management
9%
Resources
12%
orker's
Comp.
6%
B-37
PROGRAM:
FUND:
PROGRAM GROUP:
ADMINISTRATION
GENERAL
ADMINISTRATIVE SERVICES ACCTNO. 0011110-12
PERSONNEL
MAINTENANCE & OPERATIONS
CAPITAL OUTLAY
GRAND TOTAL
FULLTIME POSITIONS, , „.
HOURLY/FTE POSITIONS ":
1999-2000
ACTUAL
210,776
55,926
3,998
2000-01
ACTUAL
215,197
239,626
44,590
2001-02
BUDGET
227,441
459,318
74,665
2002-03
BUDGET
239,790
429,350
45,000
270,700| 499,413) 761,424) 714,140
2.00
0.00
2.00
0.00
2.00
0.00
2.00
0.00
PROGRAM GROUP DESCRIPTION:
The Administrative Services Director provides leadership and coordination for the Administrative Services
departments that form the support structures for the City of Carlsbad. This budget includes the cost for the
Administrative Services Director and related support staff, special projects supporting organizational development
and certain special purpose programs and studies. Additionally, a diverse group of City employees working with
City's Leadership Team on ways to improve the organization, called the Strategic Change Team's funding falls in
this area.
The Administrative Services Departments include Finance, Human Resources, Information Technology, Purchasing,
Records Management, and Risk Management. These departments share a common goal of providing top quality
services to an assorted range of internal and external customers.
The goals of these departments focus on the creation of systems and structures that support the top quality service,
fiscally responsible management of our resources, employee development and learning, streamlining processes and
procedures, and construction of the infrastructure that serves the citizens of Carlsbad. More information on the
goals, achievements, workload statistics and programs within each Administrative Services department can be found
on the following budget summary pages.
KEY GOALS FOR 2002-03:
• The Administrative Services Director is responsible for assisting each department in the accomplishment of its
goals. The Director's primary role is to remove roadblocks, coordinate department efforts, deal with competing
priorities, assist with resource allocation, and provide leadership and support for the Administrative Services
staff.
• The Director is also responsible for furthering employee development, workplace improvement and
communication through implementation of the Experience Carlsbad Program, supporting the employee
development teams, and supporting the respectful workplace and safe workplace education efforts.
• As a member of project teams, the Director is responsible for the creation of financing programs that support the
City's capital improvement efforts including major road, water projects, parks, open space and trails.
• As part of the Leadership Team, the Director is the spokesperson for Administrative Services issues with the top
leadership of the City. With the other members of the Leadership Team, the Director is responsible for the
creation of an organization that can carry out the City Council's policy direction.
SIGNIFICANT CHANGES:
None.
B-38
PROGRAM:
FUND:
PROGRAM GROUP:
FINANCE
GENERAL/ENTERPRISE
FINANCE ACCTNO. 0011310
PERSONNEL
MAINTENANCE & OPERATIONS
CAPITAL OUTLAY
GRAND TOTAL
FULL TIME POSITIONS , ,
HOURtY/FJE PC-SITlQNg
GENERAL FUND
SEWER ENTERPRISE
WATER ENTERPRISE
TOTAL FUNDING
1999-2000
ACTUAL
967,205
322,498
9,621
2000-01
ACTUAL
1,221,516
538,971
12,344
1,299,324] 1,772,831
14,00
0.00
1,299,324
, : • • 21.00
^ 0.00
1,385,831
160,000
227,000
1,299,324| 1,772,831
2001-02
BUDGET
1,422,119
884,654
13,825
2,320,598
21.00
1.00
1,926,048
157,820
236,730
2002-03
BUDGET
1,448,990
982,308
0
2,431,298
21.00
.1.00
2,016,098
172,500
242,700
2,320,598) 2,431,298
MISSION STATEMENT:
Our mission is to ensure that the City of Carlsbad makes sound financial decisions. We take pride in accomplishing
this mission by maintaining individual and departmental credibility; working together as a team while respecting each
other's differences; and, consistently striving to go above and beyond expectations.
PROGRAM ACTIVITIES:
Lonq-Ranqe Financial Planning and Budget Management
• Prepare ten year operating forecasts incorporating various "what if scenarios to facilitate decision-making for
City Council and City departments.
• Prepare and monitor annual capital and operating budgets to allocate resources in a cost-effective manner in
alignment with the Council's goals.
• Perform bi-annual review of all City fees and present recommendations for changes to Council.
• Prepare annual cost allocation plan to provide an accurate accounting of program costs.
• Monitor and report on revenues and expenditures monthly to insure budgetary integrity and facilitate effective
decision-making.
Accounts Receivable/Payable. Payroll and Cashiering
• Accurately bill, collect, record, and report all City revenues.
• Collect all funds due the City through timely follow-up of delinquent accounts and use of collection agencies.
• Prepare checks for City employees, and service and commodity suppliers.
• Maintain turnaround time of 30 days to process and pay invoices.
General Accounting and Reporting
• Prepare and maintain finance records and documents in conformity with generally accepted accounting
principles and applicable legal and contractual provisions.
• Prepare Comprehensive Annual Financial Report in conformity with generally accepted accounting principles.
• Provide City management and Council with timely monthly financial reports.
• Monitor City debt issues to insure timely payment and identify refinancing opportunities. Provide continuing
disclosure as required.
Audits
• Monitor sales tax audit contract to ensure effectiveness.
• Perform in-house internal control reviews as needed.
Assessment District/CFD Administration
• Assist in evaluation and formation of new districts.
• Issue bonds for capital projects when required. Pay debt service and provide continuing disclosure information.
• Provide administration of CFDs and assessment districts as required by formation documents and State law.
B-39
PROGRAM:
FUND:
PROGRAM GROUP:
FINANCE
GENERAL/ENTERPRISE
FINANCE
PAGE TWO
ACCTNO. 0011310
WORKLOAD AND PERFORMANCE INDICATORS:
• Average number of days to issue Monthly
Financial Status Report
• Awards received for CAFR
• Awards received for Annual Budget
• Number of business licenses processed
• Number of account payable checks
processed
• Number of payroll checks issued
• Number of electronic payroll checks issued
• Outstanding debt issues administered
FY1999
N/A
CSMFO/GFOA
Meritorious:
Operating
5,616
N/A
11,197
11,362
$100 million
FY2000
19
CSMFO/GFOA
Excellence:
Operating and
Capital
GFOA
6,214
15,176
9,452
12,204
$81 million
FY2001
16
CSMFO/GFOA
Excellence:
Operating and
Capital
6,300
17,271
10,012
14,407
$77 million
KEY ACHIEVMENTS FOR 2001-02:
• Increased the efficiency and effectiveness of accessing information for financial reporting.
• Increased the efficiency of utility bill processing and timelier receipt of utility account revenue through the
implementation of cycle billing.
• Improved the City's collection efforts by implementing new processes and contracting for additional assistance
in collecting all revenue owed to the City.
• Prepared the City for implementation of the new financial reporting requirements for state and local
governments as set forth by the Governmental Accounting Standards Board by preparing pro forma statements
under the new rules.
• Developed and began implementation of an internal audit program to enhance the financial integrity of the City.
• Achieved efficiencies in the billing and collecting of false alarm penalties by bringing the billing operations in-
house.
KEY GOALS FOR 2002-03:
Top-Quality Services
• Increase the number of cashiering sites available to our customers, provide more timely information and
streamline processes through the selection of a Citywide cashiering system.
• Prepare a strategic plan for the use of city-owned property that will provide the space and facilities necessary to
encourage the achievement of the Community vision.
Transportation
• Assist in creating financing plans that will allow for the development of key road segments throughout the City.
Finance
• Insure continued financial health of the City through the use of improved forecasting techniques for revenues
and expenditures in the City's General fund.
• Improve the City's ability to monitor, forecast and provide for the replacement of the City's major infrastructure
assets.
• Compile forecasts and array options to assist the City Council in determining the future needs of the City's
lighting and landscape districts and alternatives for financing the costs of the storm water program.
• Evaluate the financial impacts of locating a seawater desalinization plant in Carlsbad.
SIGNIFICANT CHANGES:
Additional funds have been added for a citywide cashiering system.
B-40
PROGRAM:
FUND:
PROGRAM GROUP:
PURCHASING
GENERAL
PURCHASING ACCTNO. 0011410
PERSONNEL
MAINTENANCE & OPERATIONS
CAPITAL OUTLAY
1999-2000
ACTUAL
282,959
143,493
3,545
2000-01
ACTUAL
312,666
188,961
2,512
2001-02
BUDGET
363,545
289,933
11,200
2002-03
BUDGET
404,908
285,862
0
GRAND TOTAL ± 429,997| 504,140) 664,678[ 690,770
FULL TIME POSITIONS , - : "'** . '
HOURLY/FTE POSITIONS
; __ 5.00
1.00
, 6-00
0.50
, * 6.00
0.50
6.00
1.25
MISSION STATEMENT:
The Purchasing Department's mission is to provide top quality service through effective working relationships to
obtain the necessary goods and services in a professional, responsive, timely, and cost effective manner.
PROGRAM ACTIVITIES:
Bids and Quotations
• Update and maintain formal bid and quotation files.
• Prepare and maintain vendor lists by commodities.
• Issue and manage formal bid and quotation processes.
Commodity/Service Contracts
• Track and renew annual commodity and service contracts.
• Develop new annual contracts.
• Develop and administer joint agency contracts.
• Assist City departments in the creation and administration of contracts.
Public Works Contracts
• Maintain current contractor's list by classifications.
• Publish Public Works contracts, maintain plan logs and manage the bidding process.
Records Management
• Assist departments in transferring records to City storage facilities.
• Administer the records storage program at the City warehouse.
Central Stores
• Review and update Stores Catalog for items carried in Central Stores.
• Act as shipping and receiving for the Faraday Administration Center.
• Purchase and distribute office supplies for City departments.
Surplus Property
• Maintain inventory of surplus City property and direct surplus property to requesting departments as it becomes
available.
• Direct disposal of surplus and lost/unclaimed Police property.
B-41
PROGRAM: PURCHASING PAGE TWO
FUND: GENERAL
PROGRAM GROUP: PURCHASING ACCTNO. 0011410
PROGRAM ACTIVITIES (Continued):
Messenger and Mail Service
• Act as liaison with U. S. Postal Service.
• Alert City staff to postal requirements to improve deliverability.
• Review and update inter-departmental services.
• Reduce postage costs by the use of pre-sort of first-class mail.
• Collect outgoing City mail and apply postage.
• Maintain postage usage records by department/program.
• Sort and distribute all incoming City mail.
WORKLOAD STATISTICS:
(Est)
FY 99-00 FY 00-01 FY01-02
Number of Purchase Orders Issued 1,703 1,626 1,600
Dollar Amount of Purchase Orders Issued $38,627,055 $48,197,538 $55,000,000
Pieces of Mail Processed 124,507 157,482 175,000
KEY ACHIEVEMENTS FOR 2001-02:
• 99.6% of all completed purchase requests were processed within one working day.
• Established a new E-commerce site for purchase of maintenance, repair and industrial supplies.
• 90% of customers rated purchasing services as good or higher in a customer service survey.
• Provided nine classes on purchasing and contracting, four classes on the IFAS purchasing module, four classes
on mailing procedures, one class on online ordering of supplies and two classes on Internet purchasing
guidelines.
• Updated the City's Emergency Resources Directory.
• Participation on selection committee which established new County wide office supply contract.
• Negotiated contract for City Library and photocopy vending services.
• Negotiated office furniture contract to be used by the City and other agencies in the County.
• Converted three central stores paper forms to electronic forms available on the Intranet.
KEY GOALS FOR 2002-03:
Top Quality Services
• Improve contract management as well as track and create reports required by changes in the Purchasing
Ordinance.
• Provide Purchasing Web pages with frequently requested, highly accurate and timely information for our internal
and external customers.
• Receive the Achievement of Excellence in Procurement Award for 2002.
• Increase the number of annual contracts for goods and services by 10%.
SIGNIFICANT CHANGES:
Addition of hourly positions to provide support and coverage for mail service and central stores and to improve
contract management.
B-42
PROGRAM:
FUND:
PROGRAM GROUP:
HUMAN RESOURCES
GENERAL
HUMAN RESOURCES ACCT NO. 0011510 THRU 0011550
PERSONNEL
MAINTENANCE & OPERATIONS
CAPITAL OUTLAY
GRAND TOTAL
FULL TIME POSITIONS
HOURLY/FTE POSITIONS
1999-2000
ACTUAL
600,587
463,992
16,567
1,081,146
8.00
0.50
2000-01
ACTUAL
607,169
472,387
1,583
1,081,139
8.00
0.50
2001-02
BUDGET
659,150
1,496,711
21,259
2002-03
BUDGET
703,520
1,253,323
7,000
2,177,120] 1,963,843
9.00
0.50
9.00
0.75
MISSION STATEMENT:
People are our priority...We take care of the people who take care of Carlsbad.
PROGRAM ACTIVITIES:
Benefits
• Implement ongoing internal and external customer satisfaction feedback system for all major HR services.
Employment: Recruitment, Classification, Compensation, and Human Resource Systems
• Proactively consult with departments regarding their staffing and classification needs.
• Attract and retain qualified candidates for City employment and fill job vacancies.
• Maintain up-to-date classification and compensation structure.
• Conduct follow-up training in support of Performance Management and Compensation System for management
employees.
• Implement enhancements to Human Resources Information System to increase the efficiency and effectiveness
of the system.
• Participate in consortium testing for positions in Police and Fire.
Training
Present professional and personal development programs in supporting core competencies.
Conduct annual benefits education program with employees.
Educate employees on policies and requirements of Department of Transportation (DOT) Program.
Conduct quarterly management meetings.
Conduct Citywide workshops on employee orientation and City policies.
Administration
• Continue enhancements on the Human Resources web page and City's intranet to expand information access
to internal and external customers.
• Administer DOT Program for commercial drivers.
Employer/Employee Relations
• Implement Citywide employee appreciation events.
• Coordinate timetable for meeting and conferring with employee associations.
• Confer with City departments to identify areas of concern with current Memoranda of Understanding.
• Meet and confer with employee associations to communicate City Council direction and authority; share
employee interest with City Council.
• Consult with employees and departments concerning employee relations concerns and provide direction of City
policy.
• Assist departments in responding to outside regulatory agencies (Department of Fair Employment & Housing,
EEOC, etc.).
• Participate in Citywide committees reviewing process improvement, customer service and other areas for
enhanced employee satisfaction.
B-43
PROGRAM:
FUND:
PROGRAM GROUP:
HUMAN RESOURCES
GENERAL
HUMAN RESOURCES
PAGE TWO
ACCT NO. 0011510 THRU 0011550
WORKLOAD STATISTICS.
Measures for Classification/ FY01-02*
Compensation Review
Number of classification descriptions 20
revised/created
Number of positions reviewed 30
Measures for Recruitment
Number of applicants processed 2,370
Number of recruitments processed 41
Number of eligibles on employment list 422
Number of new hires 56
Number of promotions/transfers 17
* As of 04/15/02
** Average recruitment cycle time: 40.2 Working Days
(For period between: 12/01/00 & 05/04/01)
Five Year Recruitment Trend
0)osQ.in
I
Q.£UJ
00
on
60
on
n
24
79
?n
48
22
64
?3
52
Hi
56 v
D Promo/Trans
D Hires
97-98 98-99 99-00 00-01 01-02
Fiscal Year
KEY ACHIEVEMENTS FOR 2001-02:
• Processed 2755 applicants, 46 recruitments, 61 new hires and 24 promotions.
• Reorganized department - Appointed new Human Resources Director, hired new Human Resources Manager,
hired new clerical staff and created Resource Center and Business Partner structure.
• Updated departments' mission statement.
• Published HR Newsletter, as well as developed and distributed HR Brochure.
• Implemented "Office Partner Program" to address clerical coverage issues during absences.
• Implemented "HR is in" off site mobile services program.
• Enhanced the HR website, including new content such as salary schedules, benefits information, Memoranda of
Understanding and job descriptions.
• Enhanced employee development by offering Professional Growth Day, Conflict Resolution Skills for
Supervisors & Respectful Workplace training.
• Created and promoted organization wide recognition events for employees including: ice cream social, beach
fun run, Employee Appreciation Month, Taste of Carlsbad, and Health Expo.
• Conducted HR Customer Satisfaction Survey and developed action plan.
• Completed negotiations with CFA for a 5-year contract.
• Implemented a job-sharing program for the Police Communications Unit.
• Updated Drug & Alcohol Policy for Commercial Drivers and conducted annual training for supervisors and
employees.
• Developed a new Workplace Safety Policy and trained 51% of all full-time and part-time employees.
KEY GOALS FOR 2002-03:
Top Quality Services
• A strategic plan that allows the Human Resources Department to continually identify and implement
opportunities for improvement.
• A 10-year forecast model that projects future personnel costs, major operational costs and capital costs.
• Action plan to conduct a Business Process Review (BPR) of HR Resource Center processes. Streamlined HR
processes to improve efficiency within the HR Resource Center.
• Succession plan for the Fire Department that will include an in-depth analysis of the workforce and short-term
and long-term strategies for implementation.
• A Public Works maintenance classification structure that allows for flexibility of job assignments and provides
opportunities for professional development.
Learning
• Employee development program aimed at developing the core competencies that are important to the
organization.
• A critical evaluation of and strategic plan for a citywide Learning Management System.
SIGNIFICANT CHANGES:
None.B-44
PROGRAM:
FUND:
PROGRAM GROUP:
WORKERS' COMPENSATION
SELF INSURANCE
WORKERS' COMPENSATION ACCTNO. 6111520
PERSONNEL
MAINTENANCE & OPERATIONS
CAPITAL OUTLAY
GRAND TOTAL
FtiLL TIME POSITIONS • ~ . ', .. ,-
HOURLY/FTE POSITIONS
1999-2000
ACTUAL
82,848
676,296
0
2000-01
ACTUAL
71,836
880,450
0
2001-02
BUDGET
79,165
939,552
0
2002-03
BUDGET
95,152
988,647
0
759,144| 952,286] 1,018,717) 1,083,799
'". 1.00
0.00
1.00
0.00
1.00
. 0.00
,,'-" 1.00
0.00
MISSION STATEMENT:
People are our priority...we promote the development, well-being and success of employees and the organization.
PROGRAM ACTIVITIES:
Workers' Compensation Claims and Administration
• This fund is utilized to provide payment for medical, indemnity and defense expenses incurred as the result of
occupational injuries and illnesses. It is also utilized to pay for related administrative and insurance expenses.
PERFORMANCE MEASURE:
• Average lost days per claim = 5.4 (for the period of 07/01/01 - 01/01/02).
KEY GOALS FOR 2002-03:
Top Quality Services
• Implement systems to accurately capture and track occupational disability leave, monitor lost days of work and
make recommendations to reduce the number of days an employee is out of the workplace.
SIGNIFICANT CHANGES:
None.
B-45
PROGRAM:
FUND:
PROGRAM GROUP:
RISK MANAGEMENT
GENERAL LIABILITY SELF-INSURANCE
RISK MANAGEMENT ACCT NO. 6121930
PERSONNEL
MAINTENANCE & OPERATIONS
CAPITAL OUTLAY
GRAND TOTAL
FUfiLJlME POSITIONS', , % ,^v>
HOURCY/FTE POSITIONS
1999-2000
ACTUAL
139,404
940,252
2,484
2000-01
ACTUAL
149,712
642,400
0
2001-02
BUDGET
170,190
1,189,185
0
2002-03
BUDGET
186,073
1,301,386
0
1,082,1401 792,112| 1,359,375L 1,487,459
2,00
.*'• , * 0.50
2.00
0.50
•<•• 2.00
" 0.50
2,00
' 0.50
PROGRAM GROUP DESCRIPTION:
Risk Management administers the funding of the self-insured and insured portions of the program, manages the
administration of property and general liability claims, works in conjunction with the City Attorney's Office and outside
counsel to monitor, control and resolve litigated matters, and provides training for various departments to minimize
the risk of future losses.
PROGRAM ACTIVITIES:
Litigation Management
• The fund is used for settlements, costs and defense expenses incurred as the result of general liability claims
against the City, and for related administration and insurance expenses. Risk Management works with the City
Attorney's Office and outside counsel to monitor, control and resolve litigated matters in the areas of property,
casualty and general liability.
Insurance/Self-lnsurance
• Directs the marketing, renewal, planning and funding of the insured and self-funded portions of the program;
administers the general liability self-insurance funds.
Claims Management
• Directs and administers the claims management program for property, casualty and general liability by using a
combination of in-house services and a contract claim administrator.
Loss Prevention/Training
• Provides direction, programs and training for various City departments to minimize the risk of future losses.
KEY ACHIEVEMENTS FOR 2001-02:
• Developed a citywide ergonomics program.
• Implemented revisions to the professional services contract insurance requirements.
KEY GOALS FOR 2002-03:
Top Quality Services
• A policy on responsibility for sewer laterals.
• Implementation of records retention program.
• Strategic plan for a Citywide Learning Management system.
SIGNIFICANT CHANGES:
None.
B-46
PROGRAM:
FUND:
PROGRAM GROUP:
HEALTH INSURANCE
INTERNAL SERVICE
HUMAN RESOURCES ACCTNO. 6131520
PERSONNEL
MAINTENANCE & OPERATIONS
CAPITAL OUTLAY
GRAND TOTAL
FULLTIME POSITIONS'- ' ' • * . - '
HOURLY/FTE POSITIONS'. ' '
1999-2000
ACTUAL
46,440
2,720,572
0
2000-01
ACTUAL
53,886
2,289,200
0
2001-02
BUDGET
54,200
2,574,500
0
2002-03
BUDGET
57,452
3,026,500
0
2,767,012) 2,343,086| 2,628,700| 3,083,952
0,00aoo
. 0.00
0:00
< : . - 0.00
/' ' ' ,0.00
•'.' • 0.00
0.00
MISSION STATEMENT:
People are our priority...we promote the development, well-being and success of employees and the organization.
PROGRAM ACTIVITIES:
This fund is used to pay health insurance premiums for the General employees and dental premiums for all
employees.
SIGNIFICANT CHANGES:
None.
B-47
PROGRAM:
FUND:
PROGRAM GROUP:
RECORDS MANAGEMENT
INTERNAL SERVICE
RECORDS MANAGEMENT ACCTNO. 6141610
PERSONNEL
MAINTENANCE & OPERATIONS
CAPITAL OUTLAY
GRAND TOTAL
FULL TIME POSITIONS
HOURLY/FTE POSITIONS
1999-2000
ACTUAL
220,796
326,467
134,908
682,171
8.00
0.00
2000-01
ACTUAL
436,582
745,985
78,663
2001-02
BUDGET
486,230
547,474
56,300
2002-03
BUDGET
522,700
651,987
8,000
1 ,261,230) 1,090,004) 1,182,687
8.00
0.00
8.00
0.00
8.00
0.00
WORK PROGRAM:
The Records Management Department is responsible for developing and implementing Citywide records
management and document management programs, and is tasked with maintaining City records in an identifiable
and accessible manner to fulfill public, legal, and historical requirements for preservation and storage of information.
The Records Management Department also provides staff support for the part-time elected City Clerk.
PROGRAM ACTIVITIES:
Records Management
• Continue implementation of the Citywide Records Management Program and Document Management System
(DMS).
• Maintain City records in an identifiable and accessible manner in fulfillment of public, legal and historical
requirements for preserving and storing information.
Administrative Support Activities
Provide staff support for the part-time elected City Clerk, including the 2002 General Municipal election.
Ensure the City's compliance with the requirements of the "Brown Act" open meeting law.
Ensure that requirements for public hearing noticing are met.
Provide maintenance and quarterly supplement service to the Carlsbad Municipal Code on the Internet.
Provide subscription service for City Council agendas and minutes.
Assist the public and City departments with requests for information; providing research services concerning
Council action since City incorporation on July 16, 1952; providing copies upon request; and providing copy
certification services.
Maintain the City Hall Xerox 5885 by provision of key operator services, supplies and current maintenance
agreement.
B-48
PROGRAM:
FUND:
PROGRAM GROUP:
RECORDS MANAGEMENT
INTERNAL SERVICE
RECORDS MANAGEMENT
PAGE TWO
ACCTNO. 6141610
WORKLOAD STATISTICS:
Documents processed:
CY/2000
Agendas 161
Agenda Bills 415
Resolutions 441
Ordinances 38
Documents to Recorder 545
Contracts/Agreements 743
Subscriptions to Municipal Code 101
Copies 563,428
Images in QMS
Conversion 420,000
Day Forward 5,148
Corrections 2,240
Storage
Boxes of Files 282
Microfiche Boxes 12
KEY ACHIEVEMENTS FOR 2001-02:
CY/2001
125
621
414
52
472
307
106
51,378
0
229,905
2,527
284
12
• Document Management System (DMS) installed and operational and utilized by approximately 260 users
citywide.
• Records Retention Schedule and Procedures developed for citywide use and implemented Phase 2 and 3 in
departments.
KEY GOALS FOR 2002-03:
• Improve communication and provide access to information through the application of available technologies.
• Improve access to, and management of, City documents through the further implementation of the DMS and
complete phase three, which expands functionality and increases the number of users. Begin phase four
planning.
• Continue implementation of Records Management Program to organize City Records.
SIGNIFICANT CHANGES:
None.
B-49
PROGRAM:
FUND:
PROGRAM GROUP:
INFORMATION TECHNOLOGY
INTERNAL SERVICE
INFORMATION TECHNOLOGY ACCTNO. 6401710
PERSONNEL
MAINTENANCE & OPERATIONS
CAPITAL OUTLAY
GRAND TOTAL
FULLIOME.PQSITJONS *-,•-•<.,'.
HQURLY/FTE'POSITIQNS ! ' ->, , '
1999-2000
ACTUAL
946,594
1,331,481
0
2,278,075
,14:00
0.00
2000-01
ACTUAL
1,156,686
1,781,353
(516)
2001-02
BUDGET
1,217,010
3,289,206
678,951
2002-03
BUDGET
1,388,121
2,625,413
482,100
2,937,5231 5,185,167| 4,495,634
15.00
0.00
,15.00
0.00
= 16.00o.oo
MISSION STATEMENT:
Provide resources that will support departments in the performance of work tasks through technology.
PROGRAM ACTIVITIES:
Computer Support Services
• Ensure that all City computers remain operational with minimum downtime.
• Guarantee availability of hardware for all the City's mini computers, workstations, desktop computers, and the
Citywide network.
• Provide support for all standard City applications.
Telecommunication Support Services
• Ensure the City's telecommunication network and its associated equipment remain operational with minimum
downtime.
• Provide the necessary support for all telephone and data communication equipment.
New Systems Support
• Meet the information needs of the users and encourage the appropriate use of computers and communication
technology to increase productivity and enhance communication.
• Increase citizen access to City services through the use of technology.
KEY ACHIEVEMENTS 2001-02:
• Deployed an enterprise back-up system to backup data from servers' citywide to a central tape library at
Faraday.
• Implemented a Request for Action system that allows the City to provide quick and effective response to citizen
calls for service.
• Improved staff access to key information by continued enhancement of the intranet, adding budget and Human
Resources information links.
• Began rollout of Windows 2000 PC's.
• Formalized the Information Technology project request process through the Information Technology
Governance Committee (ITGC) to further the effective use of technology.
• Increased access to the Document Management System (DMS) by adding Purchasing department documents,
increasing general users and deploying several public access terminals.
• Provided for a more secure internal computing environment by:
• Separating our internal network into separate networks for staff and public.
• Deploying a more capable and scalable firewall infrastructure.
• Implementing email virus scanning and attachment blocking.
• Improved public printing at the libraries with the implementation of a new coin operated printing system.
• Improved reporting functions of IFAS through the additional CDD reports and users.
B-50
PROGRAM: INFORMATION TECHNOLOGY PAGE TWO
FUND: INTERNAL SERVICE
PROGRAM GROUP: INFORMATION TECHNOLOGY ACCTNO. 6401710
KEY GOALS FOR 2002-03:
Top Quality Service
• Improve access to and management of City documents through further implementation of a Document
Management System (DMS) that meets the needs of system users.
• Further the implementation of the Strategic Technology Plan to ensure effective use of information technology
Citywide.
• Upgrade PCs to Windows 2000 operating system Citywide.
SIGNIFICANT CHANGES:
Addition of full-time System Administrator I to assist with desktop and network support.
B-51
PROGRAM: MISCELLANEOUS NON-DEPARTMENTAL ACCT NO. 001-VARIOUS
150-1310
GENERAL FUND
Non-Departmental
Community Promotion
(Carlsbad Convention
and Visitor's Bureau)
Community Contributions
Beach Parking
Hiring Center
Dues and Subscriptions
Property Tax, LAFCO, & Other Admin. Fees
Misc Expenditures
Total Non-Departmental Expenditures
Transfers
Golf Course Contribution
Hosp Grove Debt Service
Infrastructure Replacement Fund
Transfer to Storm Water Program
Management Incentive Pay (Adopted budget)
Transfer to Capital Improvement Program
Misc / Transfers Out
Total General Fund Transfers
Contingencies
Contingencies (Adopted budget)
GENERAL FUND TOTAL
CARLSBAD COMMUNITY CONTRIBUTIONS
Community Activity Grants
1999-00
ACTUAL
$369,972
1 1 ,460
0
76,673
33,535
239,252
37,761
768,653
600,000
800,000
2,000,000
0
0
7,000,000
652,949
10,400,000
4,000,000
$15,168,653
FUND
34,022
2000-01
ACTUAL
$370,279
0
0
82,583
40,993
270,692
61,529
826,076
600,000
800,000
3,000,000
0
0
4,300,000
106,400
8,700,000
4,300,000
$13,826,076
49,351
2001-02
BUDGET
$507,959
82,120
36,000
85,849
65,600
296,000
0
1,073,528
0
800,000
3,000,000
1,873,190
460,000
1,500,000
0
7,633,190
3,987,320
$12,694,038
65,000
2002-03
BUDGET
$363,000
11,235
36,000
85,849
62,400
383,400
0
941,884
600,000
800,000
3,500,000
1,076,419
500,000
0
0
6,476,419
2,500,000
$9,918,303
60,500
B-52
PROGRAM: PUBLIC SAFETY
FUND: VARIOUS
PROGRAM GROUP: VARIOUS SUMMARY
PERSONNEL
MAINTENANCE & OPERATIONS
CAPITAL OUTLAY
GRAND TOTAL
FUt±miVtE, POSITIONS v H' „-" ' ",;L
HOURLY/FTE POSITIONS : " :, ,
1999-2000
ACTUAL
17,261,191
4,145,869
282,844
21,689,904
'- • 213,75
2,90
2000-01
ACTUAL
18,557,392
4,685,951
337,609
2001-02
BUDGET
19,948,868
6,820,577
550,777
2002-03
BUDGET
21,477,378
6,553,027
804,056
23,580,952) 27,320,222| 28,834,461
' -. ' '"' 217.75
2,43
,222.75
2.65
• 229.75
3.67
Police
60%
B-53
PROGRAM:
FUND:
PROGRAM GROUP:
POLICE
GENERAL
POLICE SUMMARY
PERSONNEL
MAINTENANCE & OPERATIONS
CAPITAL OUTLAY
GRAND TOTAL
FULL TIME POSITIONS
HOURLY/FTE POSITIONS
1999-2000
ACTUAL
10,124,737
2,806,964
197,136
2000-01
ACTUAL
10,731,244
3,104,807
187,981
2001-02
BUDGET
11,876,032
4,452,905
157,147
2002-03
BUDGET
13,018,757
4,209,645
156,000
13,128,837[ 14,024,032) 16,486,084| 17,384,402
134.00
1.90
138.00
1.43
143.00
1.65
150.00
2.50
MISSION STATEMENT:
With a commitment to professional excellence, the members of the Carlsbad Police Department provide quality
service to the community to ensure the preservation of life and property and the maintenance of law and order. In
doing so, we protect the rights of all persons; we strive to treat every person with respect, dignity and compassion;
we hold ourselves to the highest ethical and professional standards of conduct; we are committed to personal
integrity, common purpose and support of each other as essentials to an effective and productive work environment;
and we provide leadership in our profession as an example for all law enforcement and to guarantee the best
possible service to our citizens.
PERFORMANCE/WORKLOAD MEASURES:
2001 Average Response Times
Priority one calls are those in which there is an
immediate threat to life or property. Our goal is to
respond to all priority one calls in an average of six
minutes or less. In 2001, we responded on average
faster to priority one calls than our goal. Priority one
calls made up less than one percent of our total call
volume in 2001. Priority two (urgent calls) and
priority three (calls for reports) calls made up over 99
percent of our total call volume. Our average
response time in 2001 to the lowest priority call was
approximately 22 minutes.
Priority #
1
2
3
5.7
11.7
0 5
22,6
10 15 20 2
MINUTES
Citizen Satisfaction
In an effort to provide the best service possible to the
community, the Carlsbad Police Department has
been surveying victims of crime since 1991. This
survey helps the department measure satisfaction
and obtains feedback from citizens who have had
contact with our department. Over 4,000 responses
have been received to-date.
911 Dispatcher
Officers
Detectives
Records
Administration
4.4
4.7
4.4
4.5
4.5
1
Poor
3
Good
4 5
Excellent
B-54
PROGRAM:
FUND:
PROGRAM GROUP:
POLICE
GENERAL
POLICE
PAGE TWO
SUMMARY
PERFORMANCE/WORKLOAD MEASURES (Continued):
Crime
The Police Department measures crime with the
FBI index crimes. FBI index crimes include
homicide, rape, robbery, aggravated assault,
burglary, larceny/theft, and motor vehicle theft.
40
30
20
1 0
37.3
3 1 .0
28 .2
25.1
22.3
1997 1998 1999 2000 2001
FBI Index Crimes per 1,000 Population
KEY ACHIEVEMENTS FOR 2001-02:
• Crime continued to decrease to levels not seen in at least 20 years. When population is taken into
account, the FBI index crime rate for 2001 was likely the lowest on record and less than half of
what it was 10 years earlier.
• Priority one calls are those in which there is an immediate threat to life or property. Our goal is to
respond to all priority one calls in an average of six minutes or less, in 2001, we responded on
average faster to priority one calls than our goal (5.7 minutes).
• The School Resource Officer program was expanded to include middle schools. The School
Resource Officer program places an officer in our local schools to deter crime through
enforcement and to create positive interaction between the department, students, parents, and
school staff.
• The Police Department's juvenile diversion division offered a new series of classes for parents
with difficult children. "The Parent Project" series of classes was such a success, three
subsequent classes were offered including one in Spanish.
• The "Every 15 Minutes" program - to teach youth the dangers of drinking and driving - was
conducted for the first time at La Costa Canyon High School.
• To meet emerging crime trends, a new detective was trained to target financial crimes against the
elderly.
• The department presented a new parent awareness seminar, "Juvenile Drug Trends," for
Carlsbad community groups and schools concerning juvenile drug trends, the influence of music,
and gang recruitment techniques.
• The department continued to move forward with plans to replace our computer-aided dispatch
system and expand communications and technology available to officers in the field.
• The department was awarded a local law enforcement block grant to help fund participation in the
Simon Weisenthal Museum's "Tools for Tolerance" program, enhancements to the department's
hostage negotiation response, an additional radar trailer to monitor speeding in neighborhoods,
and drug court support.
• A comprehensive review of unsolved, old violent crime cases was conducted to determine viability
of DNA evidence.
• A citywide drill to increase critical incident capability was held.
B-55
PROGRAM: POLICE PAGE THREE
FUND: GENERAL
PROGRAM GROUP: POLICE SUMMARY
• The department worked in conjunction with local schools to develop plans for police response to
school incidents.
• The efficiency of police officer training was improved with the development of a well-managed and
cost effective training plan.
• A new program focusing on traffic safety education in the secondary schools was implemented.
KEY GOALS FOR 2002-03:
Top Quality Service
Enhanced disaster response.
Expand community involvement in special events planning process.
Implement recommendations to enhance public safety dispatching.
Improve response time through beat realignment.
Maintain or improve citizen satisfaction with investigative services.
Update long-range plan for staffing, equipment, and technology.
Finance
• Reduce time lost due to injuries through voluntary fitness/wellness program.
Communication
• Expand police department communications with the public.
Learning
• Expand traffic safety education in local schools.
B-56
PROGRAM:
FUND:
PROGRAM GROUP:
ADMINISTRATION
GENERAL
POLICE ACCT NO. 0012110
PERSONNEL
MAINTENANCE & OPERATIONS
CAPITAL OUTLAY
GRAND TOTAL
FULLTIM&F'OSfffONS'.'t,,, •--•: '
HOURLY/FTE POSITIONS
1999-2000
ACTUAL
294,487
459,542
4,897
2000-01
ACTUAL
323,563
591,989
0
758,926| 915,552
3.00
0.00
3.00
,0,00
2001-02
BUDGET
312,010
1,225,033
0
2002-03
BUDGET
310,807
1,024,546
0
1,537,043] 1,335,353
3.00
0.00
; 3.00
0.00
WORK PROGRAM:
Develop and administer functions and programs that support the City's and the Police Department's statement of
values in a manner responsive to the City and its citizens. Provide leadership and support to department divisions.
Establish policies and long-range plans to meet department goals and City needs.
PROGRAM ACTIVITIES:
Service Programs
• Develop and manage programs, which reduce crime, encourage citizen participation and improve Community
safety.
Organization
• Assist staff with individual and group development.
Division Support
• Provide support to divisions to assist with meeting goals.
Leadership
• Provide department staff with the knowledge and training necessary to carry out the department's mission.
SIGNIFICANT CHANGES:
None.
B-57
PROGRAM:
FUND:
PROGRAM GROUP:
FIELD OPERATIONS
GENERAL
POLICE ACCT NO. 0012120
PERSONNEL
MAINTENANCE & OPERATIONS
CAPITAL OUTLAY
GRAND TOTAL
FULL TIME' POSITIONS. •.,' • •=- .
HQURLY/FTE POSITIONS
1999-2000
ACTUAL
4,642,016
707,273
58,583
5,407,872
57.00
0.00
2000-01
ACTUAL
4,927,952
679,149
95,896
5,702,997
.59.00
0.00
2001-02
BUDGET
5,184,798
786,962
43,967
6,015,727
: 60.00
0.00
2002-03
BUDGET
5,499,226
728,052
46,000
6,273,278
. 62.00
0.00
WORK PROGRAM:
Respond to calls for service and provide emergency services, preventative patrol, traffic enforcement and special
enforcement to the community. Enforce laws and ordinances, preserve the peace and provide for the protection of
life and property through proactive programs of enforcement and prevention.
PROGRAM ACTIVITIES:
Calls for Service
• Respond to calls for emergency and non-emergency services.
• Investigate crimes.
• Enforce City ordinances.
Reports
• Take reports including crime, arrest, collisions, incident, citation, and field interview.
Response Time
• Respond to priority one calls in less than six minutes.
WORKLOAD STATISTICS:
Calls for Service
Cases
Average Priority One Response
(in minutes)
CY1998
67,076
9,083
5.6
CY1999
67,284
8,338
5.2
CY2000
64,366
8,381
5.1
CY2001
68,798
9,050
5.7
SIGNIFICANT CHANGES:
In order to maintain service levels, two new patrol officers have been added.
B-58
PROGRAM:
FUND:
PROGRAM GROUP:
COMMUNITY SERVICES
GENERAL
POLICE ACCT NO. 0012121-23, 2125, 2142
PERSONNEL
MAINTENANCE & OPERATIONS
CAPITAL OUTLAY
GRAND TOTAL
FULL TIME POSlTfOHS. , .;;
H0URE.Y/FTE POSITIONS
1999-2000
ACTUAL
824,191
244,842
4,400
1,073,433
,12.00
0:50
2000-01
ACTUAL
971,551
304,575
10,058
2001-02
BUDGET
1 ,207,724
338,700
82,464
2002-03
BUDGET
1,399,963
390,397
55,500
1, 286,1 84| 1,628,888j 1,845,860
: '1.3.00
0.50
14.00
0.50
16.00
0.50
WORK PROGRAM:
The Community Services division includes the following programs:
Traffic
• Provide traffic enforcement as a means of reducing collisions and hazardous violations in the community. Provide
accident investigation and traffic safety programs to make the streets and highways safer.
Volunteer Program
• Provide support to the members of the Police Department and help enhance Community safety and security
through education and crime prevention.
Reserve Program
• Provide assistance to the patrol and traffic functions, as well as other divisions within the department by
assignment as transport, cover, or working with officers.
Lagoon Patrol
• Maintain order in and around Agua Hedionda Lagoon on a year-round basis. Provide general coverage and
respond to concerns involving Agua Hedionda and the other City lagoons. Maintain order on City's trail systems
and in the City's parks.
Crime Prevention
• Help improve the quality of life for Carlsbad citizens through crime prevention awareness and education and help
reduce the rear of crime through the dissemination of information.
PROGRAM ACTIVITIES:
Traffic
• Maintain a high profile of traffic enforcement in order to reduce traffic collisions Citywide.
• Conduct accident investigations to document location, time and cause of traffic collisions in order to provide
targeted traffic enforcement.
• Provide data for traffic engineering.
Senior Volunteer Patrol
• Conduct crime prevention patrols.
• Assist with traffic control and special events.
• Conduct education activities in the community.
• Provide regular contact for homebound citizens.
In-House Volunteers
• Provide general clerical assistance.
• Provide data entry assistance.
• Contact crime victims.
• Provide assistance with special assignments and projects.
B-59
PROGRAM: COMMUNITY SERVICES PAGE TWO
FUND: GENERAL
PROGRAM GROUP: POLICE ACCTNO. 0012121-23,2125,2142
PROGRAM ACTIVITIES (Continued)
Reserves
• Provide special detail assistance to all divisions of the Police Department.
• Provide service to the spring and fall fairs, Oktoberfest, marathon, and other special events.
• Provide assistance with follow-up and special investigations for traffic officers and detectives.
Lagoon Patrol
• Enforce boating regulations.
• Monitor recreational boating operation on Agua Hedionda Lagoon.
• Patrol lagoon, trail, and park areas.
• Assist stranded boaters on Aqua Hedionda Lagoon.
Crime Prevention
• Target all groups within the community including crime victims and utilize community forums, surveys, media,
newsletters, and direct mailings.
• Create and implement education and awareness programs that reduce the threat of crime and enhance safety and
security.
WORKLOAD STATISTICS:
CY1998 CY1999 CY2000 CY2001
Injury collisions per mile of roadway 1.35 1.27 1.26 1.4
Number of volunteer hours contributed 16,411 14,736 15,355 14,497
Hours contributed by reserve officers 2,360 1,491 1,448 1,661
SIGNIFICANT CHANGES:
Addition of a traffic officer for DUI enforcement and a Special Events Coordinator to improve the service that the City
provides to special event promoters, applicants, residents and businesses.
B-60
PROGRAM:
FUND:
PROGRAM GROUP:
CANINE
GENERAL
POLICE ACCTNO. 0012124
PERSONNEL
MAINTENANCE & OPERATIONS
CAPITAL OUTLAY
GRAND TOTAL
FUttTIMErPOSiTIONS''" ' "' V." '<
HOURLY/FTE POSITIONS ,
1999-2000
ACTUAL
380,472
81,167
6,465
2000-01
ACTUAL
344,336
85,273
0
2001-02
BUDGET
352,051
82,984
0
2002-03
BUDGET
374,242
84,140
0
468,1 04| 429,609| 435,035| 458,382
.'>- ' „. -'4,00
0.00
4.00
0.00
" 4.00
0.00
r " ,- 4.00
0,00
WORK PROGRAM:
Augment patrol officers in general law enforcement efforts to deter crime. Enhance department's ability to locate
hidden suspects while providing greater officer safety through the use of trained Police dogs.
PROGRAM ACTIVITIES:
• Enforce laws throughout the City.
• Provide canine coverage on each patrol watch.
• Patrol remote areas using 4x4 vehicles.
• Provide canine demonstrations to schools and civic groups throughout the year to show the capabilities of
Police canine teams.
SIGNIFICANT CHANGES:
None.
B-61
PROGRAM:
FUND:
PROGRAM GROUP:
INVESTIGATIONS / FIELD EVIDENCE
GENERAL
POLICE ACCT NO. 0012126-2130
PERSONNEL
MAINTENANCE & OPERATIONS
CAPITAL OUTLAY
GRAND TOTAL
RM TIME POSITIONS ,: .
HOURE.WFTE POSITIONS
1999-2000
ACTUAL
1,180,726
222,490
2,730
1 ,405,946
14.00
0.90
2000-01
ACTUAL
880,022
187,869
0
1,067,891
•11.00
0.50
2001-02
BUDGET
1 ,027,408
215,338
27,500
2002-03
BUDGET
1,098,241
203,820
0
1,270,246] 1,302,061
12.00
0.50
= 12.00
-1.00
WORK PROGRAM:
Investigations
Provide follow-up investigations leading to the identification and apprehension of persons responsible for the
commission of crimes. Provide coordination of the criminal justice process; recover stolen property; process
property and evidence.
Field Evidence
To collect and process evidence collected in the field by police employees. Evidence may include fingerprints,
photographs, plaster casting, bodily fluids, and other items.
WORKLOAD STATISTICS:
Violent Crime Clearance Rate
Property Crime Clearance Rate
Property Recovery Rate
SIGNIFICANT CHANGES:
Part-time assistance has been added to handle the increase in evidence processing.
CY1998
48%
22%
26%
CY1999
45%
21%
26%
CY2000
56%
19%
38%
B-62
PROGRAM:
FUND:
PROGRAM GROUP:
VICE/NARCOTICS
GENERAL
POLICE ACCTNO. 0012131
PERSONNEL
MAINTENANCE & OPERATIONS
CAPITAL OUTLAY
GRAND TOTAL
FULL;TIM6:POSrriONS * •' ~ . -"' •• '.". .
HOURLY/FTE POSITIONS . 'V
1999-2000
ACTUAL
307,012
66,193
0
373,205
/ -">' ,3.00
0.00
2000-01
ACTUAL
367,070
76,196
44,091
487,357
4.00
0.00
2001-02
BUDGET
464,579
116,102
0
580,681
\ - 4.00
, • o.oo
2002-03
BUDGET
565,798
80,705
0
646,503
* 4.00
0.00
WORK PROGRAM:
Enforce the laws relating to vice and narcotics violations. Identify and assist in the prosecution of those responsible
for the use, distribution, sales, and proliferation of illegal drugs in the community. Identify and arrest those
responsible for the violation of laws concerning prostitution, gambling, liquor laws, and other illegal activities.
WORKLOAD STATISTICS:
Felony and Misdemeanor Arrests
SIGNIFICANT CHANGES:
CY1998
123
CY1999
179
CY 2000
117
CY2001
230
Includes overtime for tactical response team training and operations.
B-63
PROGRAM:
FUND:
PROGRAM GROUP:
YOUTH / SCHOOL PROGRAMS
GENERAL
POLICE ACCT NO. 0012132,41,43
PERSONNEL
MAINTENANCE & OPERATIONS
CAPITAL OUTLAY
GRAND TOTAL
FULL TIME POSITIONS
HOURLY/FTE POSITIONS
1999-2000
ACTUAL
406,974
99,789
7,187
2000-01
ACTUAL
444,023
93,770
26,149
513,950| 563,942
6.00
0.00
6.00
0.30
2001-02
BUDGET
484,175
161,980
193
646,348
6,00
. . 0.50
2002-03
BUDGET
502,667
163,735
0
666,402
. . 6.00
, 0.50
WORK PROGRAM:
Police School Resource Officers
Maintain order in and around schools to deter crime through enforcement and to create a positive interaction among
students, citizens and educators.
Juvenile Diversion
Provide juvenile diversion services and programs to all age levels of youth within the City of Carlsbad, both
delinquent and pre-delinquent, and within and prior to the criminal justice system.
D.A.R.E
Assist elementary and junior high school students in recognizing, and resisting, the pressures of drug use through
education.
PROGRAM ACTIVITIES:
Police School Resource Officers
• Maintain order and enforce laws on school campuses located within the City of Carlsbad.
• Educate staff and students regarding laws pertaining to schools, child abuse and law enforcement in general.
• Conduct follow-up investigations on juvenile and school-related crime.
• Serve as a resource for school safety preparedness.
D.A.R.E
• Provide drug abuse prevention instruction to schools located in Carlsbad including elementary and junior high
schools.
• Assist schools and parents with drug abuse prevention programs
SIGNIFICANT CHANGES:
One DARE officer position was converted to a School Resource Officer position at the request of Carlsbad Unified
School District.
B-64
PROGRAM:
FUND:
PROGRAM GROUP:
PROPERTY AND EVIDENCE / RECORDS
GENERAL
POLICE ACCTNO. 0012133,2145
PERSONNEL
MAINTENANCE & OPERATIONS
CAPITAL OUTLAY
GRAND TOTAL
FLJLtTlME; POSITIONS • , '' v
HOURLY/FTE POSITIONS
1999-2000
ACTUAL
292,920
52,465
6,616
352,001
•* "7,00
' 0.50
2000-01
ACTUAL
311,784
54,675
554
2001-02
BUDGET
353,395
61,960
998
367,013] 416,353
— ,7.00
"• ' 0.13
7.00
0.15
2002-03
BUDGET
366,573
66,965
0
433,538
7.00
0.00
WORK PROGRAM:
Property and Evidence
Responsible for the processing, retention, disposal, and security of all property and evidence obtained or seized by
the department.
Records
Provide processing, filing, and maintenance of all department law enforcement official records; responsible for data
entry into the ARJIS system and for Statewide reporting of crime information; responsible for public reception,
information and fingerprinting services for the public.
PROGRAM ACTIVITIES:
Property and Evidence
• Physically maintain and accurately track all property and evidence.
• Return property to lawful owners.
• Dispose of property according to law.
Records
• Process Police records including arrests, crime cases, citations, traffic collisions, and incident reports.
WORKLOAD STATISTICS:
Police Cases
SIGNIFICANT CHANGES:
None.
CY1998
9,083
CY1999
8,338
CY2000
8,381
CY2Q01
9,050
B-65
PROGRAM:
FUND:
PROGRAM GROUP:
FAMILY SERVICES
GENERAL
POLICE ACCTNO. 0012134
PERSONNEL
MAINTENANCE & OPERATIONS
CAPITAL OUTLAY
GRAND TOTAL
HJliJlFIME PdSlTJpNS' .'-, >-
HOURLY/FTE ROSff FONS
1999-2000
ACTUAL
344,764
9,376
0
2000-01
ACTUAL
350,550
7,476
0
2001-02
BUDGET
364,665
24,780
0
2002-03
BUDGET
379,558
25,600
0
354,1401 358,026| 389,445| 405,158
; - 4.00
->\ • , o.oo
4.00
0-00
,4.00
0.00
^4.00
. : Q.OO
WORK PROGRAM:
Provide follow-up investigation leading to the identification and apprehension of persons responsible for the
commission of crimes relating to juvenile offenders, juvenile victims and domestic violence incidents. Provide
coordination of the criminal justice process as it related to prevention, education, diversion, and enforcement.
PROGRAM ACTIVITIES:
• Investigate and follow-up on crime and incident reports as they relate to all phases of the family.
• Assist in the coordination of diversion, prevention and education activities offered by the department such as
DARE, GUIDE, Juvenile Justice Panel, parenting skills classes, activities for children after school, and
mentoring at-risk youth.
SIGNIFICANT CHANGES:
None.
B-66
PROGRAM:
FUND:
PROGRAM GROUP:
TASK FORCE
GENERAL
POLICE ACCTNO. 0012135
PERSONNEL
MAINTENANCE & OPERATIONS
CAPITAL OUTLAY
GRAND TOTAL
FULL -TIME POSITIONS
HQURtY/FTE POSITIONS -
1999-2000
ACTUAL
0
0
0
0
0,00
0:00
2000-01
ACTUAL
314,666
0
0
314,666
- .. ' 3,00
0.00
2001-02
BUDGET
275,092
5,995
0
2002-03
BUDGET
373,196
13,610
29,000
281,087] 415,806
3.00
0.00
4,00
0.00
WORK PROGRAM:
Participate in specialized regional crime-fighting task forces including North County Gang Task Force, Regional Auto
Theft Task Force, Narcotics Task Force, and ID Theft Task Force.
SIGNIFICANT CHANGES:
Addition of an investigator to staff a regional ID Theft Task Force. The salary and benefits for this position are 100%
reimbursed by the County of San Diego.
B-67
PROGRAM:
FUND:
PROGRAM GROUP:
SUPPORT OPERATIONS
GENERAL
POLICE ACCTNO. 0012140
PERSONNEL
MAINTENANCE & OPERATIONS
CAPITAL OUTLAY
GRAND TOTAL
HUiL'TliEP'OSmONS . "•?•'-•'
HOURLY/FTE PORTIONS ' : ' y -
1999-2000
ACTUAL
450,818
748,863
0
1,199,681
- 6.00
0:00
2000-01
ACTUAL
452,361
908,854
2,280
1,363,495
6.00
0.00
2001-02
BUDGET
467,925
1,212,777
25
1,680,727
: 6,00
0,00
2002-03
BUDGET
511,073
1,243,545
4,000
1,758,618
I, 6.00
:! ''- -0.50
WORK PROGRAM:
Provide support to the Police Department in the form of training, automated systems coordination and personnel
recruitment and hiring.
PROGRAM ACTIVITIES:
• Coordinate all department training.
• Recruit new employees.
• Organize testing programs and conduct POST mandated pre-employment investigations.
• Maintain and develop the department's automated systems such as CAD, ARJIS and the microcomputer
network.
SIGNIFICANT CHANGES:
A part-time employee has been added to assist with the implementation and operation of the new public safety
computer-aided dispatch and other technology related systems.
B-68
PROGRAM:
FUND:
PROGRAM GROUP:
COMMUNICATIONS CENTER
GENERAL
POLICE ACCTNO. 0012144
PERSONNEL
MAINTENANCE & OPERATIONS
CAPITAL OUTLAY
GRAND TOTAL
FULL IMPOSITIONS. ;
HOURLY/FTE POSITIONS
1999-2000
ACTUAL
887,152
79,970
2,007
969,129
, ,',, -16.00
.0.00
2000-01
ACTUAL
900,296
82,960
1,279
984,535
i,,,;;; -16.00
Q.QQ
2001-02
BUDGET
1,077,468
133,270
0
2002-03
BUDGET
1,290,372
139,030
1,500
1,210,738) 1,430,902
16.00
' 0,00
18.00
0.00
WORK PROGRAM:
Provide Police and Fire communications including answering calls for service and dispatching appropriate
emergency personnel.
PROGRAM ACTIVITIES:
• Provide routine and emergency communications service to Police, Fire and emergency medical programs.
WORKLOAD STATISTICS:
CY1998 CY1999 CY 2000 CY2001
Police Calls for Service 67,076 67,284 64,366 68,798
SIGNIFICANT CHANGES:
Two Communications Officers have been added to increase the minimum staffing in the communications center from
two to three during peak periods.
B-69
PROGRAM:
FUND:
PROGRAM GROUP:
VARIOUS
ASSET FORFEITURE
POLICE ACCTNO. 1212110
PERSONNEL
MAINTENANCE & OPERATIONS
CAPITAL OUTLAY
GRAND TOTAL
FULL TIMEPOSITIONS = „
HOURLY/FTE POSITIONS : (
1999-2000
ACTUAL
6,620
34,711
104,251
2000-01
ACTUAL
270
28,553
7,674
2001-02
BUDGET
55,426
75,176
0
2002-03
BUDGET
7,000
38,000
20,000
145,582| 36.497J 130,602) 65,000
0.00
0.00
,0.00
0.00
0.00
0.00
0.00
0.00
WORK PROGRAM:
The City of Carlsbad periodically receives forfeited funds and assets as a result of the Police Department's narcotics
enforcement efforts. These funds are restricted by statute for use by the Police Department only and cannot be
used to supplant existing budgets.
SIGNIFICANT CHANGES:
Included in the 2002-03 appropriation is funding for the reconfiguration of the community services - traffic lieutenant
area, an extra set of patrol vehicle equipment to reduce down-time when a patrol car is taken out of service, and
equipment and training for a taser lethal force alternative program.
B-70
PROGRAM:
FUND:
PROGRAM GROUP:
BICYCLE PATROL
COPS GRANT
POLICE ACCTNO. 123XXXX
PERSONNEL
MAINTENANCE & OPERATIONS
CAPITAL OUTLAY
GRAND TOTAL
FULL TIME POSITIONS, ; ,V" *'' >'•
HOURLY/FTE POSITIONS
1999-2000
ACTUAL
106,585
283
0
106,868
, '- ',2.00
0.00
2000-01
ACTUAL
142,800
3,468
0
146,268
: :- ,. 2,00
0.00
2001-02
BUDGET
249,316
11,848
2,000
263,164
" , „ ,4.00
0.00
2002-03
BUDGET
340,041
7,500
0
347,541
4.00
0.00
WORK PROGRAM:
This is the sixth year the City has received funding from the Citizen's Option for Public Safety (COPS). The City
Council approved the Police Department's request to use these funds for the continued hiring of two full-time officers
for assignment to the year-round bicycle patrol. During 2001, Council approved increasing bicycle patrol staffing
from two (2) to four (4). The bicycle patrol members patrol the beach and downtown areas as well as other areas as
required for special enforcement.
PROGRAM ACTIVITIES:
The patrol will direct attention to minor drug, alcohol, skateboarding, loitering, and noise complaints in the downtown
and beach areas of the City as well as other areas as needed.
SIGNIFICANT CHANGES:
None.
B-71
PROGRAM:
REFUND:
PROGRAM GROUP:
FIRE
GENERAL
FIRE SUMMARY
PERSONNEL
MAINTENANCE & OPERATIONS
CAPITAL OUTLAY
GRAND TOTAL
FU&tflME POSITIONS . <:: • >. '.•; -
HKXJRtY/FFE RCSITIONS
1999-2000
ACTUAL
7,136,454
1,338,905
85,708
8,561,067
.: -. ?7a75
1.00
2000-01
ACTUAL
7,826,148
1,581,144
149,628
9,556,920
79J5
1.00
2001-02
BUDGET
8,072,836
2,367,672
393,630
2002-03
BUDGET
8,458,621
2,343,382
648,056
10,834,138| 11,450,059
•..V-. .-79.7,5
1.00
79.75
1.17
PROGRAM GROUP DESCRIPTION:
The Fire Department's mission is to enhance the quality of life in our community by delivering exceptional services in
safeguarding lives, property and our environment. We measure our success in accomplishing our mission through
customer surveys, comparative analysis, operational effectiveness and goal accomplishment.
WORKLOAD STATISTICS:
Paramedic Satisfaction Survey
J I
1.00 2.00 3.00 4.00 5.00
Not Poor Fair Good Excellent
Acceptable
Total Incidents By Year
1997 1998 1999 2000 2001
4.55 4.68 4.78 4.81 4.98
(Priority 1 average response time in minutes)
Customer Service Ratings: The above chart
shows our customer satisfaction level for
emergency medical services for fiscal year
2000-01. The results show that our paramedics
continue to live up to the department's standard
for treating all patients as we would want our
own family treated.
Incidents & Response Times: The Fire
Department average response time in 2001 was
4.98 minutes and we reached the scene of
priority one incidents 79% of time in five minutes
or less. This achieves our average response time
goal but not our overall goal of arriving on scene
in five minutes or less 90% of the time.
KEY ACHIEVEMENTS FOR 2001-02:
• Developed a Fire Department 10-year Financial Plan.
• Received delivery of three new medic units (ambulances).
• Assisted in conducting a Critical Incident/Emergency Operations Center drill.
• Hired and/or promoted fourteen personnel.
• Completed the installation of Automatic External Defibrillators in all major city facilities and certified employees
at each facility on their use.
• Received certification of our Rescue Unit at the Medium Rescue level by the state Office of Emergency
Services.
B-72
PROGRAM: FIRE PAGE TWO
REFUND: GENERAL
PROGRAM GROUP: FIRE SUMMARY
KEY GOALS FOR 2002-03:
• Determine the feasibility of utilizing the inactive treatment facility on Tamarack Avenue as a multi-use training
facility.
• Evaluate the need and means for providing additional or modified ambulance services in the City.
• Continue to proceed with the relocation of Fire Station 6 in the southeast section of the City.
B-73
PROGRAM:
FUND:
PROGRAM GROUP:
ADMINISTRATION
GENERAL
FIRE ACCT NO. 0012210
PERSONNEL
MAINTENANCE & OPERATIONS
CAPITAL OUTLAY
GRAND TOTAL
POtE-T [ME POSITIONS , ,
ttQURLY/FTE POSITIONS
1999-2000
ACTUAL
297,491
310,434
50,435
658,360
3.75
0.00
2000-01
ACTUAL
321,922
365,984
34,561
2001-02
BUDGET
344,009
744,194
99,089
722,467| 1,187,292
, ,' ' 'J3,75
0.00
"', -. 3.75
0.00
2002-03
BUDGET
339,593
836,109
556,456
1,732,158
'<••"• '3.75
0.00
WORK PROGRAM:
The Administration Division coordinates the overall operation of the Fire Department.
PROGRAM ACTIVITIES:
Coordination
Provide program direction and planning for all divisions.
• Implement and support Fire Department specific values, mission, and vision.
• Support and facilitate department managers in accomplishing their goals.
• Facilitate team-building programs for all members of the management team.
• Promote increased communications and participation at all levels within the department.
Planning
Provide a planning interface with other City departments and regional agencies in order to facilitate improved Fire
services.
• Continue to oversee the implementation of the department's strategic plan.
• Monitor development under the Growth Management Program as it related to the relocation of Fire Stations 3 & 6.
• Participate in the San Diego County Unified Disaster Council and Hazardous Materials Response JPAs.
• Coordinate department information systems.
• Participate in regional planning activities, including the 800 MHz Regional Communication System and regional
cooperation on dispatching, training, recruitment and facilities.
SIGNIFICANT CHANGES:
None.
B-74
PROGRAM:
FUND:
PROGRAM GROUP:
EMERGENCY OPERATIONS
GENERAL
FIRE ACCTNO. 0012220
PERSONNEL
MAINTENANCE & OPERATIONS
CAPITAL OUTLAY
GRAND TOTAL
FULL ftME\POSiTIGNS . ,
HOURLY/FTE POSITIONS '
1999-2000
ACTUAL
6,466,699
868,445
27,329
7,362,473
,, 71DO,
OJOO
2000-01
ACTUAL
7,096,237
1,013,885
94,975
8,205,097
71,00
0.00
2001-02
BUDGET
7,270,343
1,206,846
291,541
2002-03
BUDGET
7,624,930
1,198,405
90,000
8,768,730] 8,913,335
71.00
0.00
7100
0.00
WORK PROGRAM:
Respond to citizen requests for assistance in a timely manner with appropriate equipment and properly trained
personnel.
PROGRAM ACTIVITIES:
Emergency Response
Maintain an effective fire and medical emergency response system throughout the City.
• Maintain fire apparatus, equipment and facilities at a high level of readiness.
• Maintain a response time of five minutes or less, 90% of the time, to priority one fire and medical calls for
service.
Training
Provide all safety personnel appropriate training in order to enhance their personal safety as well as services
provided to citizens.
• Provide 20 hours of training to all shift personnel on a monthly basis.
• Train personnel to meet individual and company performance standards.
• Provide 24 hours of annual EMS continuing education to all field personnel.
Service
Operations personnel will maintain a positive community profile of service, friendliness and responsiveness.
• Engine companies to participate in public education programs, special community events and code enforcement
inspections on an annual basis.
SIGNIFICANT CHANGES:
None.
B-75
PROGRAM:
FUND:
PROGRAM GROUP:
PREVENTION
GENERAL
FIRE ACCT NO. 0012225
PERSONNEL
MAINTENANCE & OPERATIONS
CAPITAL OUTLAY
GRAND TOTAL
FUklTfMEiPDSJTiONS' „
HOURLY/FTE POSITIONS
1999-2000
ACTUAL
372,264
32,484
2,136
2000-01
ACTUAL
407,989
44,840
20,092
406,884| 472,921
: , ,.--: 5.00
1.00
, - 5.00
1.00
2001-02
BUDGET
458,484
155,190
3,000
2002-03
BUDGET
494,098
50,690
0
616,674| 544,788
5.00
1.00
''-''• " '--, -5.00
4 - ~ 1.17
WORK PROGRAM:
Reduce the potential for fire and property loss in the community through Fire Code enforcement and Fire Protection
Engineering.
PROGRAM ACTIVITIES:
Enforcement and Engineering
Provide code enforcement occupancy inspections in existing public buildings and those under construction.
Provide training and administrative support for engine company code enforcement activities.
Conduct periodic fire inspections in commercial, industrial and multi-family residential buildings.
Perform code compliance reviews on construction plan submittals within 10 days.
Perform new construction inspections within 24 hours of request.
Conduct code compliance inspections in licensed care facilities.
Respond to citizen hazard inquiries and complaints.
SIGNIFICANT CHANGES:
The addition of a part-time Hosp Grove Forest Rehabilitation Officer to assist in implementing the Hosp Grove
Management and Rehabilitation Plan.
B-76
PROGRAM:
FUND:
PROGRAM GROUP:
WEED ABATEMENT
GENERAL
FIRE ACCT NO. 0012235
PERSONNEL
MAINTENANCE & OPERATIONS
CAPITAL OUTLAY
GRAND TOTAL
FULUJIME POSITIONS- , »
HOURLY/FTE POSITIONS
1999-2000
ACTUAL
0
73,178
0
2000-01
ACTUAL
0
96,883
0
2001-02
BUDGET
0
136,304
0
2002-03
BUDGET
0
137,250
0
73,178] 96,883^ 136,304| 137,250
0,00
0.00
0.00
Q;00
^ 0.00
0.00
0.00
0.00
WORK PROGRAM:
Manage the potential for grass and brush fires on unimproved property by means of a selective hazard abatement
program.
PROGRAM ACTIVITIES:
Hazard Identification
Identify and serve notice to owners of properties on which fire hazards exist or are likely to exist.
• Select 500-1100 parcels for clearance.
• Obtain City Council approval for abatement.
• Mail notices to property owners.
Hazard Abatement
Ensure effective abatement of hazards identified.
• Inspect all property noticed.
• During May through July, clean all property not previously abated by owners.
• Manage contractor performance and payment system.
• Obtain City Council approval to place abatement costs onto individuals property tax roll in July.
• Submit charges to County Auditor for recovery by property tax billing by August.
SIGNIFICANT CHANGES:
None.
B-77
PROGRAM:
FUND:
PROGRAM GROUP:
DISASTER PREPAREDNESS
GENERAL
FIRE ACCT NO. 0012240
PERSONNEL
MAINTENANCE & OPERATIONS
CAPITAL OUTLAY
GRAND TOTAL
FUtiLTJME.iJQSlTIONS " .•,,/".
HOURL'tiTTE'feOSITIONS
1999-2000
ACTUAL
0
54,364
5,808
60,172
• ,;• '-• , ,0.00
: -Q.QQ
2000-01
ACTUAL
0
59,552
0
59,552
- 0.00
UOO
2001-02
BUDGET
0
125,138
0
125,138
; ,j: 0.00
v " ' ' 0.00
2002-03
BUDGET
0
120,928
1,600
122,528
4-, , 0.00
* * ' , 0.00
WORK PROGRAM:
Develop and manage emergency preparedness and hazard mitigation programs that reduce the impact of natural
and man caused disasters.
PROGRAM ACTIVITIES:
Training and Education
Conduct classroom and simulation training sessions for all key City staff members.
• Conduct training and exercises with City Emergency Operations Center staff on disaster plan elements.
• Continue providing basic emergency response training to all City employees.
Planning
Develop a strategic plan to improve Citywide emergency preparedness.
• Develop a Hazard Mitigation plan.
• Restructure the emergency management administrative team.
• Coordinate program efforts to ensure future certification of the City by Federal Emergency Management Agency
(FEMA) as a "Disaster Resistant Community."
Inter-Agency Coordination
• Represent the interests of the City on the County Unified Disaster Council.
SIGNIFICANT CHANGES:
None.
B-78
PROGRAM:
FUND:
PROGRAM GROUP:
COMMUNITY DEVELOPMENT
VARIOUS
VARIOUS SUMMARY
PERSONNEL
MAINTENANCE & OPERATIONS
CAPITAL OUTLAY
GRAND TOTAL
FULL TIME, POSITIONS ; . : r, , . :
HOURLV/FTE POSITIONS .
1999-2000
ACTUAL
3,905,600
6,516,065
4,284,099
2000-01
ACTUAL
4,085,696
6,772,712
170,780
14,705,764L 11,029,188
, 53.75
1.50
, 53.75
1.50
2001-02
BUDGET
4,528,958
9,094,463
1,278,384
2002-03
BUDGET
4,811,481
9,038,214
401,032
14,901,805| 14,250,727
64.00
3.00
:, 54.00
4.14
Building
Inspection
Economic 14%
Development
1%
Redevelop-
ment
17%
Planning
21%
Comm. Dev
Admin. Ge°9raPhic
4o, Information
2%
Housing
Section 8
34%
CDBG Housing
/ Trusto2%
B-79
PROGRAM:
FUND:
PROGRAM GROUP:
ADMINISTRATION
GENERAL
COMMUNITY DEVELOPMENT ACCTNO. 0013010
PERSONNEL
MAINTENANCE & OPERATIONS
CAPITAL OUTLAY
GRAND TOTAL
FULLTIME; POSITION /; • .
HOBBLY/FTE-POSITIONS ,
1999-2000
ACTUAL
359,888
88,360
1,423
449,671
' ;s':,3.75
P.GQ
2000-01
ACTUAL
329,846
128,393
7,993
2001-02
BUDGET
267,214
182,838
54,470
2002-03
BUDGET
273,744
192,040
15,026
466,232| 504,522[ 480,810
, : 3.75
0,00
: , 3.00
, 0.00
3.00
0.00
MISSION STATEMENT:
The mission of Community Development is to guide and facilitate the development of the City of Carlsbad. We do
this in an atmosphere of creativity and cooperation. We are committed to the highest standard of integrity and
respect for diversity. We enhance the health, safety, welfare, and the quality of life for people at all economic levels
that live, work, or visit Carlsbad by providing for:
• Development of high quality projects and public facilities.
• Preservation of the local environment.
• Diverse housing, employment and enrichment opportunities.
• A strong and stable economic base
PROGRAM ACTIVITIES:
The Community Development Director assists departments within its Major Service Area (MSA) in accomplishing
individual goals. The Director also removes roadblocks, coordinates between departments with competing or
conflicting priorities, manages resource allocation and other support efforts.
KEY GOALS FOR 2002-03:
Top Quality Services
Respond to 95% of field inspection requests by the next working day.
Develop performance measures for all departments.
Average 24-hour response by Code Enforcement for non-health and safety calls for service.
Participate in the Carlsbad Emergency Management Administrative Team (CEMAT).
Participate in Performance Measurement Resource Team.
Balanced Community Development
• Resolution of Habitat Management Plan (HMP) and Golf Course planning.
• Develop South Carlsbad Coastal Redevelopment Area (SCCRA) land use strategies.
• Study codes, policies, and fees to support attraction of new commercial, recreation, and entertainment uses to
Carlsbad.
• Educate participants in the Section 8 homeownership program.
• Conduct a comprehensive facility analysis for City administration.
• Increase City owned and controlled parking in the Village redevelopment area.
• Acquire an affordable housing site in the Village redevelopment area.
• Eliminate blight in North State Street.
B-80
PROGRAM: ADMINISTRATION PAGE TWO
FUND: GENERAL
PROGRAM GROUP: COMMUNITY DEVELOPMENT ACCT NO. 0013010
KEY GOALS FOR 2002-03 (Continued):
Parks/Open Space/Trails
• Northeast park site acquisition.
• Comprehensive and qualitative open space management.
• Batiquitos Lagoon maintenance administration.
Environmental Management
• Community and City environmental consciousness.
Communication
• Additional emphasis on employee development and communication skills.
Learning
• Continuity of Community Development leadership through succession planning.
SIGNIFICANT CHANGES:
None.
B-81
PROGRAM:
FUND:
PROGRAM GROUP:
LAND USE PLANNING
& PLANNING COMMISSION
GENERAL
PLANNING ACCT NO. 0013210/0013220
PERSONNEL
MAINTENANCE & OPERATIONS
CAPITAL OUTLAY
GRAND TOTAL
FULL TIME POSITIONS ;: , ;
HOURtY/FTE POSITIONS
1999-2000
ACTUAL
1,731,671
514,196
19,181
2000-01
ACTUAL
1,825,764
420,829
399
2001-02
BUDGET
2,061,031
998,468
165,520
2002-03
BUDGET
2,286,680
980,907
0
2,265,048] 2,246,992| 3,225,019| 3,267,587
:> -V "•; ' 24,00
' : '••••' :'.' 1:00
24.00
1.00
;. . 25.00
2.00
1 25.00
. 2:00
MISSION STATEMENT:
The Planning Department's mission is to guide the planned physical development of the City in a manner that
preserves the quality of life for its citizens.
PROGRAM ACTIVITIES:
Implementation of General Plan
• Ensure that all new planning programs and development projects comply with the General Plan.
Review of Development Projects
• Provide technical support to the Planning Commission and City Council in a timely and efficient manner
regarding the compliance of all development proposals with the City's zoning, subdivision and environmental
ordinances. Update development standards as needed.
Preparation of Special Studies and Policy Review
• Prepare special studies relating to land use as directed by City Council. Provide advice to the City Council
and Planning Commission regarding policy matters related to planning and development in the City.
Implementation of Growth Management Plan
• Ensure that all development complies with the performance standards of the Growth Management Plan.
PERFORMANCE OBJECTIVES:
• Implement programs contained in the updated General Plan.
• Continue to address issues relating to endangered species and implementation of the Habitat Management
Plan.
• Ensure timely processing/review of projects in the City.
• Assist in administering the Growth Management Program, including on-going monitoring of activities.
B-82
PROGRAM:
FUND:
PROGRAM GROUP:
LAND USE PLANNING
& PLANNING COMMISSION
GENERAL
PLANNING
PAGE TWO
ACCT NO. 0013210/0013220
Number of Planning Applications Considered by the Planning Commission:
IstQtr 2ndQtr 3rd Qtr 4th Qtr
Applications Considered by
Planning Commission:
Using 1999 as a base year, 2000
reflected a 55% decrease, while year
2001 activities were up 6% over 1999.
Administrative approvals of PIPs, Sign
Permits/Programs, and Administrative
Variances are not included in the above
numbers. Administrative approvals
dropped significantly compared to
previous years with 247 in 1999, 257 in
2000, and 191 in 2001.
KEY ACHIEVEMENTS FOR 2001-02:
• Completed processing of Villages of La Costa and the Calavera Hills Master Plans.
• Continued processing of the Habitat Management Plan.
• Participated in the preparation of the Livable Communities Program including the update of the P.O. Ordinance.
• Completed a training program for the planning Commission.
• Completed the Comprehensive amendment/update of the sign ordinance.
KEY DEPARTMENT GOALS FOR 2002-03:
• Ensure top-quality services to our customers and citizens.
• Ensure that all development projects comply with City planning codes and policies.
• Continue to review all procedures and systems to ensure the timely processing of all applications, particularly
ones that create economic opportunities.
• Provide strategic advice regarding land use and long-term planning in the City.
• Continue the processing of the Bressi Ranch Master Plan, and the Carlsbad Oaks North Industrial Park.
• Enhance Planning Department information available on the web site.
• Continue to seek approval of the Habitat Management Plan (HMP) by the Coastal Commission and the wildlife
agencies.
SIGNIFICANT CHANGES:
A Planning Technician Intern position has been added to develop an internship program to promote and support
continuous learning opportunities within the City organization.
B-83
PROGRAM:
FUND:
PROGRAM GROUP:
GEOGRAPHIC INFORMATION SYSTEM
GENERAL
COMMUNITY DEVELOPMENT ACCT NO. 0013310
PERSONNEL
MAINTENANCE & OPERATIONS
CAPITAL OUTLAY
GRAND TOTAL
HULL TIME, POSITIONS .-. '• ;'
HOUftLY/FFE POSITIONS
1999-2000
ACTUAL
163,611
131,087
21,464
316,162
2.00
0.00
2000-01
ACTUAL
173,545
84,675
4,256
2001-02
BUDGET
185,600
149,150
809
262,476| 335,559
2.00
0.00
2.00
0.00
2002-03
BUDGET
201,418
104,240
0
305,658
2.00
0.50
MISSION STATEMENT:
The Carlsbad Geographic Information System (GIS) provides GIS processing services to all City departments and
disseminates GIS processing capabilities to appropriate City departments.
PROGRAM ACTIVITIES:
System Development
• Continue to work with user departments to determine and plan the use of the GIS for more effective and efficient
use of the City's spatial and spatially-related data. With the addition of a GIS Applications Specialist to the GIS
staff, we continue to be able to effectively expand the GIS program to enable various City staff to use GIS
technology. Evidence of this increased effectiveness is the quantity of GIS processing being done by Public
Works staff, using centralized GIS data and GIS software. Because of this increased use of GIS software, total
service requests in FY2000 were reduced, before springing back in response to new user demand from Public
Safety and Planning in FY 01 and 02.
Database Development
• Continue adding data layers to the enterprise-wide GIS, particularly in the areas of Public Works-related
infrastructure (street lights, street trees, assessment districts, signage, traffic signals, storm water facilities, etc.)
Database Maintenance
• Maintain the various layers within the GIS by keeping them accurate and current.
WORKLOAD STATISTICS:
Number of Service Requests:
FY2000 FY 2001 FY2002 (EsU
200 280 350
KEY ACHIEVMENTS FOR 2001-02:
• Successfully implemented a central data base of geographic information for access by all city staff.
• Through department-specific trainings, increased the usage rate of the intranet-based GIS interactive map.
KEY GOALS FOR 2002-03:
• Continue to participate in the development of a Public Works Maintenance Management System utilizing GIS
technology.
• Continue to reduce the cycle time between request and delivery of products/services.
• Disseminate GIS capabilities to City staff at the desktop level by implementing an intranet-based GIS.
• Develop the capability to search for, and select, information in the Document Management System (DMS) by
selecting areas of interest on a computer screen.
SIGNIFICANT CHANGES:
Addition of a part time position to assist in the development of a 'common places' database, and the editing of the
City's street address database.
B-84
PROGRAM:
FUND:
PROGRAM GROUP:
ECONOMIC DEVELOPMENT
GENERAL
COMMUNITY DEVELOPMENT ACCTNO. 0013510
PERSONNEL
MAINTENANCE & OPERATIONS
CAPITAL OUTLAY
GRAND TOTAL
FUkL'TFME POSITIONS ,;:! '. ;
HOURLY/FTE POSITIONS
1999-2000
ACTUAL
103,057
58,195
0
2000-01
ACTUAL
109,612
24,263
0
2001-02
BUDGET
113,906
109,500
0
2002-03
BUDGET
113,337
136,795
0
161,252| 133,875] 223,406| 250,132
1,00
0.00
. 1.00
0.00
: 1.00
0-00
L__ 1-00
0.00
MISSION STATEMENT:
Plan, organize and direct the implementation of the City's Economic Strategic Plan and Real Estate Asset Program.
PROGRAM ACTIVITIES:
Land Use
• Develop and implement land use and infrastructure strategies consistent with the General Plan that enhance
and promote economic development in Carlsbad.
Public Policy
• Develop sound policies and strategies that encourage quality business development and expansion, preserve
quality of life and consider the fiscal needs of the City.
Economic Resources
• Identify resources, opportunities and areas of economic focus. Establish programs to epitomize the positive
effects they have on the Community.
Promotion and Marketing
• Support public and private activities that focus on attracting desirable businesses and industries to the City, and
supports local tourism.
Public Relations and Education
• Provide opportunities for increased organizational, local business and citizen awareness of demographics and
economic goals and activities.
Real Estate Assets
• Coordinate the acquisition, disposal and leasing of City owned real property and the leasing of City utilized real
property.
KEY ACHIEVEMENTS FOR 2001- 02:
• Acquisition of Farmers Insurance Building.
• Completion of Tourism Study.
• Acquisition of properties adjacent to Pine School.
KEY GOALS FOR 2002- 03:
• Participate in regional economic development activities and projects.
• Identify and monitor progress of development projects that provide economic benefit to the City.
• Implement the City of Carlsbad's Economic Development Strategic Plan.
• Coordinate acquisition of real property associated with City Council goals.
• Civic Center facilities planning.
SIGNIFICANT CHANGES:
Additional funds have been budgeted to conduct a facilities needs analysis.
B-85
PROGRAM:
FUND:
PROGRAM GROUP:
BUILDING INSPECTION
GENERAL
BUILDING INSPECTION ACCTNO. 0013610
PERSONNEL
MAINTENANCE & OPERATIONS
CAPITAL OUTLAY
GRAND TOTAL
FUtCTtME POSITIONS
HOURLY/REPOSITIONS
1999-2000
ACTUAL
884,880
831,918
8,113
1,724,911
13.00
0.50
2000-01
ACTUAL
952,126
786,131
0
1,738,257
13.00
0.50
2001-02
BUDGET
1,116,738
933,360
4,800
2,054,898
13.00
1,00
2002-03
BUDGET
1,147,437
709,089
17,000
1,873,526
13;00
1.00
WORK PROGRAM:
The Building Department reviews applications for building permits, routes applications to applicable departments,
issues permits, and inspects structures under construction for compliance with Uniform Model Codes. The
department also provides code enforcement services for the City for zoning, housing, building, and other Municipal
Code violations.
PROGRAM ACTIVITIES:
• Receipt of building permit applications, coordination of building permit approvals, issuance of building permits,
inspection of new and remodeled structures, and related code enforcement activities.
PERFORMANCE MEASURES:
• The department tracks inspections per day, per field inspector, and a number of other statistical reports
associated with workloads. Customer service satisfaction levels for field inspections are also surveyed.
• The code enforcement monthly report tracks the number of days it takes to close various complaint categories.
KEY ACHIEVEMENTS FOR 2001-02:
Issued permits for $273 million in various types of construction projects.
Performed 50,000 various bldg inspections - 96% the next working day.
Final inspection on 1500 dwelling units.
Answered 2000 incoming calls for information at Code Enforcement.
Proactively removed 2000 illegal signs from the right of way.
Performed 5000 code enforcement inspections.
Handled 1000 open code enforcement cases.
KEY GOALS FOR 2002-03:
• Respond to 95% of requests for field inspections and 95% of non-health and safety-related code enforcement
calls the next working day.
• Continue to develop and implement an internship program for building inspectors.
• Provide 40 hours of staff development training for each employee.
SIGNIFICANT CHANGES:
None.
B-86
PROGRAM:
FUND:
DEPARTMENT:
HOUSING AND REDEVELOPMENT
VARIOUS
HOUSING AND REDEVELOPMENT SUMMARY
PERSONNEL
MAINTENANCE & OPERATIONS
CAPITAL OUTLAY
GRAND TOTAL
FUll TIME POSITIONS- •••'. , * ~ ! '
HOURLY/FTE POSITIONS ' :-;
1999-2000
ACTUAL
662,493
4,892,309
4,233,918
2000-01
ACTUAL
694,803
5,328,421
158,132
2001-02
BUDGET
784,469
6,721,147
1,052,785
9,788,720| 6,181,356| 8,558,401
' 10.00
0,00
r - 10.00
0.00
10.00
0.00
2002-03
BUDGET
788,865
6,915,143
369,006
8,073,014
10.00
0.64
MISSION STATEMENT:
Helping people achieve their dreams.
PROGRAM ACTIVITIES:
Affordable Housing
• Rental Assistance
• Homebuyers Assistance
• New Construction
• Rehabilitation
Enhancing Opportunities
• Career Development
• Plans
• Innovation
• Goals
Promoting Business Development
• Jobs
• Sales Tax
• New Products
• State Funds
Creating a Community Spirit
• Transportation
• Education
• Social Services
• Family Self-Sufficiency
Village Vision
• Creativity
• Expansions
• Revitalization
• Beautification
Increasing Revenues
• Federal Funds
• Property Tax
Excellent Service
B-87
PROGRAM:
FUND:
PROGRAM GROUP:
AFFORDABLE HOUSING
HOUSING TRUST FUND
HOUSING AND REDEVELOPMENT ACCTNO. 1333421
PERSONNEL
MAINTENANCE & OPERATIONS
CAPITAL OUTLAY
GRAND TOTAL
FiJLL TIME. POSITIONS : /;
HOGRLf/FTE POSITIONS : :
1999-2000
ACTUAL
129,701
29,577
328,340
487,618
2:15
: 0.00
2000-01
ACTUAL
131,798
41,007
3,546
176,351
2.15
0.00
2001-02
BUDGET
129,260
145,270
7,691
282,221
1;47
0.00
2002-03
BUDGET
125,314
128,424
1,425
255,163
••; - .-.-• 1;47
0.17
MISSION STATEMENT:
Helping people achieve their dreams.
PROGRAM ACTIVITIES:
Affordable Housing Programs
Provide staff support to implement the various affordable housing programs as set forth within the City's housing
element including:
• Mortgage Credit Certificate Program (MCC).
• Lease-to-Purchase Program
• Provide staff support to the Housing Commission.
• Participate in the San Diego Regional Housing Task Force
Affordable Housing Financial Assistance
• Negotiate and prepare financial assistance and loan documents for construction of single and multi-family
affordable housing projects.
Inclusionarv Housing
• Implement the Inclusionary Housing Ordinance by providing information to developers, the public and City staff
on the requirements of the ordinance.
• Negotiate and prepare affordable housing agreements.
• Monitor the development and operation of affordable housing developments,
WORKLOAD STATISTICS:
• Affordable Housing Units Approved:
• Affordable Housing Units Construction Starts:
• Financial Assistance to Affordable Housing Projects:
KEY GOALS FOR 2002-03:
99-00 00-01
26 units 36 units
97 units 92 units
$2,216,000 $1,135,000
EST.
01-02
286 units
182 units
$2,860,000
EST.
02-03
154 units
180 units
$3,220,000
Learning
Develop, maintain and enhance programs that result in an informed, knowledgeable and involved public through
enhanced community dialogue.
• Perform public outreach by making presentations to citizen, business and service groups, serve on regional
affordable housing committees and task forces, and make presentations at professional conferences about
affordable housing programs and their benefits to the City of Carlsbad
SIGNIFICANT CHANGES
None.
B-88
PROGRAM:
FUND:
PROGRAM GROUP:
RENTAL ASSISTANCE
HUD SECTION 8 HOUSING
HOUSING & REDEVELOPMENT ACCT NO. 1903401
PERSONNEL
MAINTENANCE & OPERATIONS
CAPITAL OUTLAY
GRAND TOTAL
FUU/flME POSITIONS * ". „• o - ,.
HQUREY/FTE POSITIONS ' '-'
1999-2000
ACTUAL
204,520
2,627,547
0
2000-01
ACTUAL
217,715
2,947,873
19,700
2001-02
BUDGET
293,728
4,439,423
21,627
2002-03
BUDGET
323,361
5,007,973
4,655
2,832,067] 3,185,288] 4,754,778j 5,335,989
,3.50
0:00
.'••- • , • 3,50
0.00
4.80
0.00
4.93
0.30
MISSION STATEMENT:
Helping people achieve their dreams.
PROGRAM ACTIVITIES:
Section 8 Tenant-Based Rental Assistance
• Provide federal funding to subsidize rents for 703 extremely-low and very-low income households.
• Assist low-income households in the community to access rental housing that is decent, safe and sanitary.
• Ensure program is being administered in compliance with federal regulations, federal guidelines, the Carlsbad
Administrative Plan, and the Public Housing Agency (PHA) Plan.
• Achieve and maintain a lease rate that effectively utilizes funding allocation.
Family Self-Sufficiency
• Designed to enable unemployed, under-employed or under-educated low-income families to achieve economic
independence from welfare.
• Assist families in identifying barriers to becoming self-sufficient.
• Provide guidance to the family to establish a five-year goal and plan.
• Coordinate needed support services and act as an advocate on behalf of the client.
Community Opportunities Program
• Collaborative effort among several local housing agencies.
• Provide education and guidance to rental assistance participants to reach personal goals and career objectives,
emphasizing housing opportunities in neighborhoods of choice.
• Participate in ongoing implementation of program changes and marketing of the program to participants and
owners in Carlsbad.
PERFORMANCE/WORKLOAD MEASURES:
• Maintain a Section Eight Management Assessment Program (SEMAP) ranking of "standard performer" or "high
performer."
• Achieve and maintain a lease rate utilizing 90-95% of allocated funds.
• Update and revise Administrative Plan to adopt changes in federal regulations.
• Expand rental assistance knowledge by conducting community workshops, providing owner and participant
newsletters and conducting owner outreach presentations.
SIGNIFICANT CHANGES:
Received an additional 75 housing vouchers to assist extremely low-income households in Carlsbad.
B-89
PROGRAM:
FUND:
PROGRAM GROUP:
COMMUNITY DEVELOPMENT BLOCK GRANT
CDBG ENTITLEMENT
HOUSING & REDEVELOPMENT ACCT NO. 3913401-02/
3917000
PERSONNEL
MAINTENANCE & OPERATIONS
CAPITAL OUTLAY
GRAND TOTAL
i=ULl.f)MEPQSmONS;,, ' ' • •
HOURLY/FTE POSITIONS* , /t
1999-2000
ACTUAL
99,150
300,489
156,655
556,294
' ", 1.50
0,00
2000-01
ACTUAL
102,951
299,357
121,884
524,192
' •..«•:• '1,25
0:00
2001-02
BUDGET
99,297
318,461
1,001,541
1,419,299
•1.18
* 0.00
2002-03
BUDGET
103,162
306,179
360,551
769,892
. 1-11
:.• 0.00
MISSION STATEMENT:
Helping people achieve their dreams.
PROGRAM ACTIVITIES:
Administration of Community Development Block Grant Program
• Provide staff support to the CDBG Funding Advisory Committee and City Council in the selection process to
identify activities to be included in the consolidated funding plan for the CDBG Program.
• Prepare a consolidated funding plan for submittal to U.S. Department of Housing and Urban Development
(HUD) for approval.
• Ensure documentation is maintained to meet guidelines established by HUD for continued CDBG funding.
• Monitor activities of grant sub-recipients to ensure that HUD and City requirements are met.
• Prepare consolidated annual performance and evaluation report for review and approval by City Council and
HUD.
PERFORMANCE MEASURES:
• Hold four (4) public meetings to review and obtain comments on the City's CDBG Program.
• Conduct selection process to identify a minimum of ten local public service agencies, which should be assisted
with funding through the CDBG Program.
• Monitor grant sub-recipients and maintain documentation necessary to meet federal guidelines to continue
receiving CDBG funds.
KEY ACHIEVEMENTS 2001-02:
• Identified potential property to purchase for development of affordable housing.
• Improved projects were started and/or completed on facilities for the La Posada de Guadalupe Homeless
Shelter.
KEY GOALS FOR 2002-03:
Top Quality Services
• Provide timely responses that result in high customer satisfaction.
SIGNIFICANT CHANGES:
None.
B-90
PROGRAM:
FUND:
PROGRAM GROUP:
REDEVELOPMENT OPERATIONS
VILLAGE AREA
REDEVELOPMENT AGENCY
HOUSING & REDEVELOPMENT ACCTNO. 8013410/8023412
PERSONNEL
MAINTENANCE & OPERATIONS
CAPITAL OUTLAY
GRAND TOTAL
FULC TIME POSITIONS ,, -'• "• ,-
HOORLY/FTE POSITIONS
1999-2000
ACTUAL
180,914
1,902,452
1,702,949
2000-01
ACTUAL
188,206
2,023,455
9,850
3,786,315] 2,221,511
-) v . 2.20
0.00
. 2.20
0:00
2001-02
BUDGET
153,410
1,424,817
16,134
1,594,361
1.56
0.00
2002-03
BUDGET
140,812
1,359,623
1,425
1,501,860
1.51
0.17
MISSION STATEMENT:
Helping people achieve their dreams.
PROGRAM ACTIVITIES:
Implementation of the Carlsbad Village Redevelopment Master Plan
• Coordination of project development and permit processing.
• Administration of the Parking-ln-Lieu Fee Program.
• Property acquisition for future redevelopment projects and facilitation of new development.
Community Relations and Public Relations Program
• Work with the Carlsbad Village Business Association and other business organizations to continue Community
awareness and public relations activities on behalf of the Redevelopment Agency.
• Continue implementation of the Village Beautification Program through coordination of maintenance efforts in
the Village.
. Work with NCTD to resolve parking and land use-related issues associated with the Village Commuter Rail
Station and surrounding properties.
PERFORMANCE/WORKLOAD MEASURES:
• Process 15 applications for redevelopment permits for improvements to existing structures or new construction
projects.
• Process 10 sign permit applications.
• Process five (5) preliminary review applications.
« Facilitate the development of at least one "special opportunity project" identified in the Village Redevelopment
Master Plan.
KEY ACHIEVEMENTS FOR 2001 -02:
• Processed 15 applications for redevelopment permits for improvements to existing structures or new
construction projects.
• Processed 11 sign permit applications.
• Processed 4 preliminary review applications.
• Developed the Village Parking Plan for removing impediments or otherwise enhancing existing public parking
lots within Village Redevelopment Area to improve utilization rates.
• Created a development plan for future redevelopment of the southwest corner of State St. and Grand Ave. to
assist with the elimination of blighting influences on North State St.
B-91
PROGRAM: REDEVELOPMENT OPERATIONS PAGE TWO
VILLAGE AREA
FUND: REDEVELOPMENT AGENCY
PROGRAM GROUP: HOUSING & REDEVELOPMENT ACCT NO. so 13410/8023412
KEY GOALS FOR 2002-03:
Finance
• Process redevelopment permits for all types of projects within the Village Area, which represent high-quality
development or redevelopment of properties and buildings.
• Eliminate blighting conditions and influences in the Village Redevelopment Area through facilitation of private
commercial and/or mixed-use development on North State Street.
Transportation
• Continue implementation of the Village Area Parking Program, which supports public/private partnerships in
financing the maintenance and construction of public parking lots in centralized areas and will encourage
visitors to the Village to utilize the public parking areas and to walk to surrounding businesses and/or tourist
activities.
« Execute the Village parking Plan (created last year) for removing impediments or otherwise enhancing existing
public parking lots within the Village Redevelopment Area to ensure better or more full utilization by
visitors/customers, business owners, employees, and/or commuters.
• Develop a Village parking enhancement assessment to pursue various opportunities available to increase City
owned public parking.
Balanced Community Development (also affects Finance Goal)
• Develop a financing and land use strategy (Redevelopment Operations Strategy) for the Village Redevelopment
Area following the July 2006 expiration of the Redevelopment Plan.
SIGNIFICANT CHANGES:
None.
B-92
PROGRAM:
FUND:
PROGRAM GROUP:
LOW/MODERATE INCOME HOUSING
VILLAGE AREA
REDEVELOPMENT AGENCY
HOUSING AND REDEVELOPMENT ACCTNO. 8033420
PERSONNEL
MAINTENANCE & OPERATIONS
CAPITAL OUTLAY
GRAND TOTAL
FULL TIME POSITIONS i
HOURLY/FTE POSITIONS
1999-2000
ACTUAL
48,208
32,244
2,045,974
2,126,426
, :o.65
0.00
2000-01
ACTUAL
54,133
16,729
3,152
2001-02
BUDGET
50,374
60,426
2,972
74,014| 113,772
0.90
0.00
0.38
0.00
2002-03
BUDGET
32,408
56,904
380
89,692
0.37
0.00
MISSION STATEMENT:
Helping people achieve their dreams.
PROGRAM ACTIVITIES:
Affordable Housing Project Processing Procedures
• Continue development of affordable housing project processing procedures.
Affordable Housing Project Coordination
• Assist in the structure and implementation of affordable housing projects.
Affordable Housing Education Program
• Direct educational programs for citizens, businesses and government agencies interested in affordable housing.
PERFORMANCE/WORKLOAD MEASURES:
• Process at least three (3) requests for financial assistance through the Housing Policy Team.
• Use existing low and moderate income housing funds to purchase property for an affordable housing project in,
or near, the Village Redevelopment Area through acquisition of vacant land and new construction or acquisition
of existing units and rehabilitation.
• Participate in at least three (3) outreach programs, professional conferences and/or citizen and business groups
on affordable housing.
KEY GOALS FOR 2002-03:
Top Quality Services
• Continue to assist private developers to provide affordable housing as required by the Inclusionary Housing
Ordinance.
Finance
• Attract and retain target industries, businesses and jobs that result in.improved economic health through the
implementation of affordable housing programs which serve to enhance the jobs/housing balance within the
Community.
SIGNIFICANT CHANGES:
None.
B-93
PROGRAM:
FUND:
PROGRAM GROUP:
REDEVELOPMENT OPERATIONS
SOUTH CARLSBAD AREA
REDEVELOPMENT AGENCY
HOUSING AND REDEVELOPMENT ACCTNO. 8103420/8113412
PERSONNEL
MAINTENANCE & OPERATIONS
CAPITAL OUTLAY
GRAND TOTAL
FULL TIME POSITIONS, , • > ,
ttOURLY/FTE POSITIONS
1999-2000
ACTUAL
0
0
0
2000-01
ACTUAL
0
0
0
2001-02
BUDGET
45,450
316,299
2,350
2002-03
BUDGET
50,580
46,457
475
L 0| 0| 364,099|_ 97,512
0.00
0.00
„ ,0.00
•: 0.00
0,5,0
0.00
0:46
0.00
MISSION STATEMENT:
Helping people achieve their dreams.
PROGRAM ACTIVITIES:
Implement Redevelopment Plan for South Carlsbad Coastal Redevelopment Area
• Facilitate redevelopment of the Encina Power Plant to a smaller, more efficient power generating plant. Utilize
excess property for projects that provide both a private and public benefit.
• Provide funding for the potential realignment of Carlsbad Boulevard which may yield excess property that could
provide for public recreational facilities and/or development of cultural facilities or other public facilities.
• Revitalize, redevelop and/or generally clean-up the Ponto Area.
• Enhance commercial and recreational functions/activities in the Redevelopment Area and increase parking and
open space amenities.
PERFORMANCE/WORKLOAD MEASURES:
• Complete land use concept and draft design guidelines for planning area three.
• Hold public meetings to gather citizen input regarding the specific plan.
KEY GOALS FOR 2002-03:
Balanced Community Development
• Develop a Conceptual Vision for the entire South Carlsbad Coastal Redevelopment Area.
• Initiate review of Vision by all appropriate parties, and initiate development of Master Plan for the South
Carlsbad Coastal Redevelopment Area.
SIGNIFICANT CHANGES:
None.
B-94
PROGRAM:
FUND:
PROGRAM GROUP:
LOW/MODERATE INCOME HOUSING
SOUTH CARLSBAD AREA
REDEVELOPMENT AGENCY
HOUSING AND REDEVELOPMENT ACCTNO. 8123420
PERSONNEL
MAINTENANCE & OPERATIONS
CAPITAL OUTLAY
GRAND TOTAL
FULL TiMe POSITIONS/ «„:;,: *„• '
HOURLY/FTE POSITIONS "-" '
1999-2000
ACTUAL
0
0
0
2000-01
ACTUAL
0
0
0
2001-02
BUDGET
12,950
16,451
470
0| 0| 29,871
''.'',, "y, • -I 0,00
0.00
'-' ,»•< ' t , O.GQ
0100
-.-•>. 0,11
0,00
2002-03
BUDGET
13,228
9,583
95
22,906
0.15
-0.00
MISSION STATEMENT:
Helping people achieve their dreams.
PROGRAM ACTIVITIES:
Implement City-Wide Affordable Housing Programs
• Affordable Housing Project Coordination for Inclusionary Housing Development.
• Affordable Housing Education Activities.
• Development of affordable housing programs.
• Facilitation of development of new affordable housing projects.
PERFORMANCE/WORKLOAD MEASURES:
• Utilize low and moderate income housing funds to assist with the development and/or construction of at least
one (1) new affordable housing project within the city limits of Carlsbad.
• Develop Housing Plan for South Carlsbad Coastal Redevelopment Area.
KEY GOALS FOR 2002-03:
Balanced Community Development
• Continue to assist private developers to provide affordable housing as required by the City's Inclusionary
Housing Ordinance.
• Implement affordable housing programs, which serve to enhance the jobs/housing balance within the
community.
SIGNIFICANT CHANGES:
None.
B-95
B-96
PROGRAM:
FUND:
PROGRAM GROUP:
COMMUNITY SERVICES
VARIOUS
VARIOUS SUMMARY
PERSONNEL
MAINTENANCE & OPERATIONS
CAPITAL OUTLAY
GRAND TOTAL
FULLTiME POSITIONS •:.'' -..
HOURLY/FTE POSITIONS
1999-2000
ACTUAL
5,342,170
3,360,592
228,980
8,931,742
' ..,-::.- -66,75
. . 111.70
2000-01
ACTUAL
6,315,466
4,897,699
186,373
11,399,538
72.75
123.35
2001-02
BUDGET
7,719,598
6,822,763
424,792
2002-03
BUDGET
8,298,170
5744,431
204,608
14,967,153| 14,247,209
80.00
120.66
84.75
119.91
Recreation
32%
Seniors
5%
Cultural Arts
6%
Library
57%
B-97
PROGRAM:
FUND:
PROGRAM GROUP:
LIBRARY
VARIOUS
LIBRARY SUMMARY
PERSONNEL
MAINTENANCE & OPERATIONS
CAPITAL OUTLAY
GRAND TOTAL
FULLttMEPOSITlONS... ,
HOURLY/FTE POSmONS
1999-2000
ACTUAL
2,907,768
1,571,982
69,736
2000-01
ACTUAL
3,657,162
2,907,332
31,352
4,549,486[ 6,595,846
; ;. . . 40.75
62.88
41.75
73.58
2001-02
BUDGET
4,504,051
4,053,311
82,466
8,639,828
45.25
69.51
2002-03
BUDGET
4,750,173
3,318,813
97,514
8,166,500
48,00
:67.25
PROGRAM DESCRIPTION:
The Carlsbad City Library provides educational, informational and recreational services for all community residents;
provides both print and non-print resources that respond to the interests and needs of a diverse population; provides
convenient access and adequate space for users and resources; and promotes a broad awareness of the library and
its services. The library contributes to the enrichment of Carlsbad's citizens by supporting lifelong learning and the
pursuit of knowledge.
KEY ACHIEVEMENTS FOR 2001 - 02:
Top-Quality Services
• Continued Sunday hours of 1-5 PM at both the Dove and Cole Libraries
• Continued to provide a wide variety of lectures, concerts and other programs for the entire community's
enjoyment.
• Completed the Library and Arts Cultural Plan.
• Provided the library catalog online, linked to the City's website, provided online databases as well as 24/7
reference services.
• Began the process of selecting a new automated library catalog system.
• Completed the installation of new, high quality public vend copiers in all library facilities.
Finance
• Continued development and support of the Carlsbad Library Foundation.
• Continued support of the Friends of the Library efforts to increase hours of operation of the bookstore.
Learning
• Published a new book, Windows on the Past: An illustrated History of Carlsbad, California, to commemorate the
50th anniversary of Carlsbad's city hood.
• Planned and implemented Carlsbad's 50lh Anniversary Celebration.
• Promoted the library's reading programs throughout local school districts.
• Continued to provide and promote computer literacy throughout the community.
• Coordinate with local school districts and other local agencies on the development of an annual educational
faire at the Dove Library.
• Continued to foster cooperation with the Carlsbad Unified School District in providing literacy instruction to high
school students.
• Participated in the continuing planning and development of the Carlsbad Citizens Academy, teaching members
of the community about how the City organization operates.
B-98
PROGRAM: LIBRARY PAGE TWO
FUND: VARIOUS
PROGRAM GROUP: LIBRARY SUMMARY
KEY GOALS FOR 2002-03:
Top-Quality Services
• Complete installation and migration of the new automated library system.
• Continue to provide a wide variety of lectures, concerts, and other programs for the entire community's
enjoyment.
• Develop and promote a system-wide volunteer program for the Carlsbad City Library.
Communication
• Participate in a new Citywide Communications Committee, which will guide and coordinate the City's
communications efforts throughout the community.
• Transform the current Community Services Brochure to include a quarterly City newsletter.
• Research methods to use current cablecast capabilities to communicate with citizens.
Learning
• Continue to promote the Library's reading programs throughout local school districts.
• Continue to provide and promote computer literacy throughout the community.
• Coordinate with local school districts and other local agencies on the development of an annual educational
faire at the Dove Library.
• Continue to foster cooperation with the Carlsbad Unified School District in providing literacy instruction to high
school students.
• Continue participation in the Carlsbad Citizen's Academy, teaching members of the community about how the
City organization operates.
B-99
PROGRAM:
FUND:
PROGRAM GROUP:
GEORGINA COLE LIBRARY
GENERAL
LIBRARY ACCT NO. 0014010/0014015-16/0014035
PERSONNEL
MAINTENANCE & OPERATIONS
CAPITAL OUTLAY
GRAND TOTAL
FULLIiMEPOSlTiONS .
HO0RLY/FTE POSITIONS /: ::
1999-2000
ACTUAL
385,564
217,661
0
2000-01
ACTUAL
1,018,749
553,837
23,210
2001-02
BUDGET
1 ,249,494
668,117
2,786
2002-03
BUDGET
1,299,290
547,595
38,880
603,225) 1,595,796] 1,920,397] 1,885,765
, -9.75
'•"': 'V:.: 18.69
10.75
26.51
-.-. ,• :- • 1.1.75
23.20
: 12.50
22.70
WORK PROGRAM:
The Cole Library is located in North Carlsbad. These services include print and non-print materials, reference
services, genealogy and local history, special programs for children, and monthly changes in exhibits and displays.
PROGRAM ACTIVITIES:
Reference
• Assist patrons in using the library, answer reference questions, reserve specific titles, and request materials
from other libraries.
Circulation
• Circulate print and non-print materials to children and adults, handle patron registration, collect fees and fines,
and track overdue items.
Programming
• Plan, schedule and develop programs for adults and children. Conduct classroom visits and tours for children
and offer computer and Internet classes for adults.
Collection Development
• Evaluate the Cole Library collection and select print and non-print materials.
Library Management
• Manage Cole Library, staff, volunteers, collection, and facility. Maintain awareness of the community.
PERFORMANCE OBJECTIVES:
• Schedule and supervise staff.
• Hire and train new staff.
• Prepare a monthly narrative and statistical summary of operation.
• Actively maintain a current, topical print and non-print collection.
• Maintain a safe and efficient facility.
• Survey the needs of, and interact with, the members of the Community.
• Respond to the needs of the community.
SIGNIFICANT CHANGES:
Three-quarters (.75) of a part-time position has been converted to a three-quarter (.75) full time Circulation
Supervisor in Cole Circulation in order to provide higher levels of customer service.
B-100
PROGRAM:
FUND:
PROGRAM GROUP:
DOVE LIBRARY
GENERAL
LIBRARY ACCTNO. 0014069-4095
PERSONNEL
MAINTENANCE & OPERATIONS
CAPITAL OUTLAY
GRAND TOTAL
FULL TIME POSITIONS" :.:; . . - /. -
HOURLt/FTE POSITIONS
1999-2000
ACTUAL
1,660,383
485,561
8,003
2000-01
ACTUAL
1,750,511
1,260,709
7,463
2,153,947| 3,018,683
19.00
33.25
- = 19.00
35.78
2001-02
BUDGET
2,130,429
1,713,633
63,929
3,907,991
20.50
34.70
2002-03
BUDGET
2,259,670
1,635,058
35,379
3,930,107
21.50
33.70
WORK PROGRAM:
The Dove Library is located in South Carlsbad. These services include print and non-print materials, reference
services, computer labs for adults and children, special programs, an art gallery, the Friends of the Library
bookstore, as well as an auditorium and meeting room.
PROGRAM ACTIVITIES:
Administration
Administration provides leadership for the Carlsbad City Library system; plans for the growth of resources and
facilities; manages all budget and fiscal matters; and coordinates relations with Local and State government, the
Library Board, the Friends of the Library, the Carlsbad Library Foundation, and the Serra Cooperative Library
System.
• Prepare department budget; process invoices, warrants and requisitions; monitor expenditures; maintain fiscal
records.
• Manage programs, exhibits and all external public relations.
• Handle grants and reports at Local and State levels.
• Provide leadership for the Library's divisions.
• Participate in and promote public education pertaining to historic areas and sites.
• Recognize historic sites by identifying various sites with plaques that will eventually be part of a historical tour.
Circulation
The circulation division registers library patrons as library members and Internet users and also provides services to
the Homebound Program and participates in the Braille Machine Exchange Program. Circulation staff checks in and
out materials, sorts and shelves library materials and repairs all audio-visual materials for the Carlsbad City Library.
• Register library patrons and Internet users; check out and in, renew, reserve, sort, and shelve library materials;
process and mail overdue, collection and reserve notices; collect fines and fees; rent audio-visual equipment;
and answer the renewal line.
• Provide library materials to patrons confined to the home and to patrons living in Harding House, Villas de
Carlsbad, Brighton Gardens, and Carisbad-by-the-Sea.
• Enroll visually impaired patrons in the Braille Institute; order and provide talking book machines and tapes;
exchange and provide repair for malfunctioning machines.
Reference
Reference Librarians assist the public with information needs, provide instruction in the use of resources and
perform research for local business, government, and the public. Reference support staff checks in and organizes
Library materials such as periodicals, pamphlets and maps for public use.
• Respond to in-person and telephone reference questions, provide instruction classes and tours, select new and
replacement materials, and facilitate book discussions.
• Provide directional information and answer basic reference questions.
• Manage a collection of 340 magazines and 32 newspapers and related back files.
• Provide public instruction in the use of computer data bases, the Internet and other software programs available
in the lab and the job and career center.
B-101
PROGRAM: DOVE LIBRARY PAGE TWO
FUND: GENERAL
PROGRAM GROUP: LIBRARY ACCTNO. 0014069-4095
PROGRAM ACTIVITIES (Continued):
Children's
The Children's Division serves children from toddler through high school and introduces young people to the
wonders of reading. The Division also assists teachers and adult students in education, child development,
children's literature, and serves as a parent resource.
• Respond to in-person and over-the-telephone questions, provide reader's advisory, library skills instruction,
group tours, and class visits.
• Select new children's materials, both print and non-print, and provide collection maintenance and stack
organization. There has been an increasingly heavy demand on our collection due to the rapid population
growth in the community.
• Provide programs to include Summer Reading Club, special holiday and seasonal events, annual short story
contest, spelling bee, and cultural enrichment programs. Introduce children to literature and encourage
creativity. Cooperative programs with the Centra de Informacion provide multi-cultural experiences.
• Supports youth and parent Internet access and research. The lab offers age appropriate introductory sessions
on Word, Power Point, and typing. A newsletter club has been established for young patrons. The lab strives to
feature web sites and other educational resources.
SIGNIFICANT CHANGES:
One (1.0) part-time position has been converted to one full-time librarian in order to provide higher levels of customer
service and more efficient use of staff time in the Children's division of the Dove Library.
B-102
PROGRAM:
FUND:
PROGRAM GROUP:
GENEALOGY/LOCAL HISTORY
GENERAL
LIBRARY ACCTNO. 0014025
PERSONNEL
MAINTENANCE & OPERATIONS
CAPITAL OUTLAY
GRAND TOTAL
FULLttME-POSITiONS . :
HOURLY/FFE POSITIONS
1999-2000
ACTUAL
64,993
2,949
19,715
2000-01
ACTUAL
82,405
9,047
0
87,657| 91,452
0.00
2;49
0.00
2.74
2001-02
BUDGET
125,548
8,295
5,306
139,149
0.00
3.00
2002-03
BUDGET
164,283
13,980
4,849
183,112
; 1.00
2.75
WORK PROGRAM:
The Genealogy/Local History Division, located at the Cole Library, provides reference and instructional assistance to
the public. The division head manages the selection, classification and organization of a 20,000 volume collection,
8,000 microfilm rolls, 120,000 microfiche, and 100 compact discs. It is a collection of excellence that draws
researchers from all over the nation.
PROGRAM ACTIVITIES:
General Reference Services
• Genealogy and local history staff respond to in-
person and telephone reference requests;
provide individual patrons with general
introduction to the collection; provide instruction
on the use of OPAC and other finding aids,
instruction on the use of various equipment
including personal computers, microfilm/fiche
readers and printers.
Collection Development Activities
• The staff participate in the Library's collection
development/acquisitions by completing catalog
checks, preparing order slips, receiving ordered
items, preparing items to send to Technical
Services, and receiving and shelving items from
Technical Services.
WORKLOAD STATISTICS:
1998-99 1999-00* 2000-01 2001-02
Reference Questions;
15,741 4,958
Computer Users:
2,323 854
20,520
1,524
In-House Usage:
22,868 9,068
Items Added:
666 600 1,016
23,000
2,600
59,435 60,000
1998-99 1999-00* 2000-01 2001-02
1,000
Coordination with NSDCGS
• The North San Diego County Genealogical
Society (NSDCGS) has been a support group for
this collection for 20 years. The division works
with and assists the Society in fund-raising for
the acquisition of materials for the collection and
in instructional programs.
1999
Programs:
41
2000*
45
2001
48
2002
50
*The Genealogy/Local History Section was closed
September 1999 through April 2000 for the Cole
Library remodel
SIGNIFICANT CHANGES:
Increase is due to full year funding for the Senior Librarian that was added in January 2002.
B-103
PROGRAM:
FUND:
PROGRAM GROUP:
CENTRO DE INFORMACION
GENERAL
LIBRARY ACCTNO. 0014030
PERSONNEL
MAINTENANCE & OPERATIONS
CAPITAL OUTLAY
GRAND TOTAL
FUUJIME'PGSmONScs . • i
HOURC.Y/FTE POSiTfOWS '',
1999-2000
ACTUAL
86,238
2,974
0
89,212
1.00
1.11
2000-01
ACTUAL
91,345
2,255
0
93,600
1.00
1.11
2001-02
BUDGET
94,659
4,254
1,727
100,640
: .i;00
1.11
2002-03
BUDGET
111,540
2,720
0
114,260
•".,-'.' ,1.00
1.40
WORK PROGRAM:
The Centra de Informacion meets the information needs of Spanish-speaking adults and children in Carlsbad.
Bilingual staff introduces residents to library services, which include Spanish-language print and non-print, bilingual
story hours for children and information and referral services. The Centre de Informacion staff is actively involved in
the community and work in partnership with schools, community agencies and other City departments to meet the
needs of our diverse community.
PROGRAM ACTIVITIES:
Outreach
• The Centra de Informacion is an active partner in
community activities. The Centra offers a
welcoming and culturally sensitive environment
that enables Spanish-speaking residents to
make use of public library services.
Programming
• The Centra de Informacion responds to
community information and educational needs by
providing a variety of adult and children's
programs.
SIGNIFICANT CHANGES:
None.
WORKLOAD STATISTICS:
1997-98 1998-99 1999-00 2000-01
Individual Patron Visits:
24,250 21,584 20,300 20,328
1997-98 1998-99 1999-00 2000-01
Program Attendance:
3,721 3,700 3,496 3,288
B-104
PROGRAM:
FUND:
PROGRAM GROUP:
TECHNICAL SERVICES
GENERAL
LIBRARY ACCTNO. 0014040
PERSONNEL
MAINTENANCE & OPERATIONS
CAPITAL OUTLAY
GRAND TOTAL
FULL TiME.ROSHlONS V ;, ,"
HOURLY/FTE POSITIONS
1999-2000
ACTUAL
387,399
99,499
0
2000-01
ACTUAL
401,682
130,494
0
486,898] 532,176
,, , 7:00
2.00
.. .- :< ZOO
,2.00
2001-02
BUDGET
463,009
609,895
1,206
2002-03
BUDGET
480,850
117,620
0
1,074,110] 598,470
7.00
2.50
7.00
2.50
WORK PROGRAM:
The Technical Services Division catalogs and prepares library materials for public use; maintains the library's on-line
database, manages the library's automated circulation system, on-line catalog, and related automated programs.
PROGRAM ACTIVITIES:
Processing
• Catalogs and processes both purchased items
and gifts. Repairs damaged materials and
arranges for binding and re-binding.
Database Maintenance
• Adds new items to the on-line database and
deletes information of lost or discarded materials.
PERFORMANCE OBJECTIVES:
WORKLOAD STATISTICS:
1997-98 1998-99 1999-00
Items Cataloged and Processed:
17,908 22,889 24,581
Items Handled for Binding:
1,707 1,695
2000-01
30,753
1997-98 1998-99
Items Added to Database:
17,908 22,889
Items Withdrawn:
16,059 18,261
1,561
1999-00
24,581
12,550
2,273
2000-01
30,753
11,783
Circulation System and On-Line Catalog
• Operates the Library's integrated library system, including all software-related activities, writes instructions, and
trains staff on new features.
• Ensure system availability at least 99 percent of the hours the library is open.
• Conduct four training sessions for staff following installation of new software.
SIGNIFICANT CHANGES:
None.
B-105
PROGRAM:
FUND:
PROGRAM GROUP:
COLLECTION DEVELOPMENT
& ACQUISITIONS
GENERAL/SPECIAL REVENUE
LIBRARY ACCTNO. 0014045/14540101
1454011/1454095
PERSONNEL
MAINTENANCE & OPERATIONS
CAPITAL OUTLAY
GRAND TOTAL
FULL Tlte:POSlTfONS
HOURLY/FTE POSITIONS
GENERAL FUND
STATE GRANTS
AV INSURANCE FUND
OTHER SPECIAL REVENUE
TOTAL FUNDING
1999-2000
ACTUAL
129,523
720,602
40,509
2000-01
ACTUAL
123,500
884,410
679
2001-02
BUDGET
149,904
958,904
7,512
2002-03
BUDGET
147,200
925,615
1,142
890,634| 1,008,589| 1,116,320| 1,073,957
2.00
0,96
508,859
285,344
39,174
57,257
890,634
2.00
0.96
678,855
299,837
0
29,897
1,008,589
2.00
1.00
998,040
0
0
118,280
1,116,320
2,00:. o.50
966,650
0
0
107,307
1,073,957
WORK PROGRAM:
Coordinate the selection of materials and plan collection development for all libraries. Allocate and monitor all
materials budgets. Order and receive all print and non-print materials.
PROGRAM ACTIVITIES:
Planning
• Develop plans for the collection of Materials.
Budgeting
• Prepare division and library-wide materials
budgets; monitor expenditures for department
and materials.
PERFORMANCE MEASURES:
Plan for collection space needs for the next five
(5) years.
Write materials collection statements for
reference areas at all facilities.
Track material accounts by major subjects.
Track vendor discounts.
Coordinate Selection of Materials
• Coordinate selection and ordering of print and
non-print materials.Coordinate selection and ordering of at least
16,000 new print and non-print materials.
SIGNIFICANT CHANGES:
None.
B-106
PROGRAM:
FUND:
PROGRAM GROUP:
MEDIA SERVICES
GENERAL
LIBRARY ACCTNO. 0014050
PERSONNEL
MAINTENANCE & OPERATIONS
CAPITAL OUTLAY
GRAND TOTAL
PULL TIME POSITIONS : ..':-.
HQURLYFTE POSiTtONS
1999-2000
ACTUAL
103,589
13,672
1,509
2000-01
ACTUAL
101,727
27,264
0
118,770] 128,991
-1.00
3.50
T.QO
3.60
2001-02
BUDGET
176,760
45,279
0
2002-03
BUDGET
163,780
43,640
14,543
222,039) 221,963
2.00
2.60
2.00
2.10
WORK PROGRAM:
The library's Media Services Division provides a wide range of professional media-related activities in support of the
library, other City departments and the City Council's communication needs. Tasked with managing the new
auditorium and meeting room, responsibilities now include overseeing operations, scheduling and providing
technical support for City and community organizations using these facilities. Services include presentation
technology support, video and cable television program production.
PROGRAM ACTIVITIES:
Programming Management
• Implement "Meeting Facility Use Policies and
Procedures." Maintain and analyze the service
delivery system. Monitor work flow, perform
ongoing fee collections and processing, and
provide comprehensive reports. Recruit,
interview, hire hourly staff, provide ongoing
training, and assign and supervise part-time
support staff.
Media Production Development
• Produce video, photographic and audio media
programs featuring such locally significant
information as: South Carlsbad City Council and
Quadrant Meeting cablecasts, library special
events, City community programs,
documentation of capital improvement projects,
growth and development.
Program Creation & Distribution
• Further define service level expectations among
Library and City departments for video program
production and distribution via available cable
televisions channels, web and intranet streaming,
library circulation, and other appropriate
technologies. Conduct research, gather
pertinent information, define infrastructure
requirements, identify, detail, and plan various
implementation options.
SIGNIFICANT CHANGES:
None.
PERFORMANCE MEASURES:
Provide two bi-annual comprehensive reports
including inquiries, bookings, income generated
and analysis, and recommendations for service
improvements.
Develop programming content plan, facilitate
planning, and produce media materials
accordingly.
Prepare and submit grant applications to help
underwrite production expenses for a series.
Conduct interviews.
Interview stakeholders.
Choose data, interview, and report.
B-107
PROGRAM:
FUND:
PROGRAM GROUP:
ADULT LEARNING PROGRAM
GENERAL
LIBRARY ACCTNO. 0014055
PERSONNEL
MAINTENANCE & OPERATIONS
CAPITAL OUTLAY
GRAND TOTAL
FULL TIME POSITIONS . ;
HOURLY/FTE POSITIONS
1999-2000
ACTUAL
90,079
29,064
0
2000-01
ACTUAL
87,243
39,316
0
119,143| 126,559
1,00
0.88
1,00
0.88
2001-02
BUDGET
114,248
44,934
0
159,182
1.00
1.40
2002-03
BUDGET
123,560
32,585
2,721
158,866
1.00
1:60
WORK PROGRAM:
The Adult Learning Program is the library's adult literacy service. The program provides free, multi-dimensional
learning experiences that enable English-speaking adults to develop basic literacy skills for independent lifelong
learning and decision-making. The program provides literacy services that support positive self-esteem and the
application of traditional and technology-based literacy skills in daily life, at work and in the Community.
PROGRAM ACTIVITIES:
Literacy Skill Development
• The program provides a variety of learning
experiences including one-to-one tutoring,
computer-assisted instruction and small-group
study. These varieties of learning experiences
are appropriate for each adult learner's individual
potential and skill needs in basic reading, writing,
math, critical thinking, and general knowledge.
SIGNIFICANT CHANGES:
None.
WORKLOAD STATISTICS:
1997-98 1998-99 1999-00 2000-01
132 122
Learners Studying:
143 127
Volunteer Tutors Instructing:
102 102 84 104
Instructional Hours Completed:
4,735 5,434 6,411 7,228
B-108
PROGRAM:
FUND:
PROGRAM GROUP:
CULTURAL ARTS
VARIOUS
CULTURAL ARTS SUMMARY
PERSONNEL
MAINTENANCE & OPERATIONS
CAPITAL OUTLAY
GRAND TOTAL
FULLTIME .POSITIONS
HOURLY/FTE POSITIONS . .
1999-2000
ACTUAL
288,791
255,154
33,269
577,214
: 4,00
1.78
2000-01
ACTUAL
372,600
326,867
29,591
729,058
4.00
2.66
2001-02
BUDGET
422,156
501,414
32,799
956,369
4.75
2.23
2002-03
BUDGET
397,799
375,626
12,402
785,827
: 4.75
.2.75
PROGRAM DESCRIPTION:
The Arts Office builds a sense of community by advancing the arts through educational, support services and
programs, which reach out to the community to develop cooperative relationships. These relationships provide
meaningful collaborations to develop and strengthen creative abilities and seek the highest quality of urban design
where arts have a significant presence, thereby enriching the lives of all Carlsbad residents.
KEY ACHIEVEMENTS FOR 2001-02:
• Produced 42 events attracting 39,000 people.
• Managed the William D. Cannon Art Gallery with a series of exceptional exhibits attracting 21,000 people.
• Continued the Arts Education Program for gallery exhibitions that served and provided 7,026 Carlsbad students
with classroom lesson workbooks, guided exhibit tours and creative workshops.
• Continued fundraising for gallery operations and arts education while sustaining levels of fundraising for all other
Arts Office programs ($66,450 for FY 2001/2002).
• Funded 56 performances, exhibits and special projects by organizations and schools in Carlsbad serving 14,500
people though the Community Grants Program.
• Provided information services via the City and CONVIS web sites, direct mail, telephone, information line,
distributed programs/newsletters/brochures, and displays at City facilities.
• Completed the Strategic Cultural Plan.
KEY GOALS FOR 2002-03:
Top Quality Services
• Implement the goals and objectives of the Strategic Cultural Plan.
• Generate sponsorship programs, fund-raising activities and collaborative projects.
• Promote, train and utilize volunteers and artists in providing services.
Learning
• Continue to work with school districts serving Carlsbad on arts education community/school planning.
• Continue to implement gallery arts education services for children and adults.
• Offer community-wide opportunities including multi-cultural events and educational opportunities for children and
adults.
• Fund-raise for arts education programs at the gallery.
B-109
PROGRAM:
FUND:
PROGRAM GROUP:
ARTS OFFICE
GENERAL FUND/ARTS GENERAL/
GALLERY DONATIONS
CULTURAL ARTS ACCTNO. 0014062/0014065/
0014068/147XXX/
142XXXX
PERSONNEL
MAINTENANCE & OPERATIONS
CAPITAL OUTLAY
GRAND TOTAL
FULL TIME POSITIONS • " ' •
HOURLY/FTE POSITIONS
GENERAL FUND
ARTS FUNDING
TOTAL FUNDING
1999-2000
ACTUAL
280,177
231,332
33,269
2000-01
ACTUAL
365,371
304,501
29,591
544,778| 699,463
4.00
1;78
489,912
54,866
544,778
4.00
2.55
638,118
61,345
2001-02
BUDGET
409,851
464,464
32,799
907,114
4,75
2,12
711,210
195,904
2002-03
BUDGET
384,805
343,326
12,402
740,533
: ;. 4,7.5
--•'• 2.64
700,533
40,000
699,463| 907,114| 740,533
WORK PROGRAM:
Implement the goals and policies of the City Council and City General Plan to plan, develop and promote the visual and
performing arts, and create a climate which encourages cultural and artistic development in Carlsbad and to enhance
educational opportunities for all segments of the community.
PROGRAM ACTIVITIES:
Volunteers
• Utilize volunteers for mailings, gallery events, jazz concerts, etc.
organizations and gallery docents and attendants.
Provide training for volunteers, artists, arts
Programs
• Produce eleven jazz concerts in the parks.
• Offer educational programs on arts and culture for children and adults.
• Offer performing arts programming at the Schulman Auditorium and other Carlsbad locations.
• Offer four (4) weeks of summer arts camp, two (2) weeks of Club Pelican, and four (4) weeks of Band Camp.
Information
• Produce a monthly calendar/newsletter.
• Produce ArtsBrag, an arts education newsletter.
• Arts Info Line for up-to-date information.
• Provide information, opportunities and resources to artists, citizens and the press.
• Provide educational information on four (4) gallery exhibitions and printed materials for exhibitions.
• Offer arts information on the City's Internet site.
Planning
• Assess short and long-range community needs for facilities and resources.
B-110
PROGRAM:
FUND:
PROGRAM GROUP:
ARTS OFFICE
GENERAL FUND/ARTS GENERAL/
GALLERY DONATIONS
CULTURAL ARTS
PAGE TWO
ACCT NO. 0014062/0014065/
0014068/14740101
1474020
KEY GOALS FOR 2002-03:
Top Quality Services
• Offer community-wide multi-cultural events (Festejando a las Madrecitas, an international multi-cultural festival and
"By Kids, for Kids."
• Serve on Chamber of Commerce Arts Education Committee.
• Continue to work with Carlsbad and Encinitas school districts implementing arts education programs.
• Offer programming and resources.
• Develop and strengthen arts organizations and provide cultural opportunities with grant allocations.
• Offer a grant initiative program to celebrate neighborhoods through the arts.
• Generate sponsorship and fund-raising activities for the Gallery, Arts Office Programs, and arts education programs.
• Submit grant applications to State and Federal funding agencies when appropriate.
• Produce a jazz program.
• Assist Arts Associates with fund-raising efforts.
• Serve on Library Foundation Board.
• Implement objectives of Cultural Arts Strategic Plan in arts education, and awareness of arts and cultural resources in
the City.
Quality of Life/Community Development
• Operate the Cannon Art Gallery with six (6) exhibitions per year.
• Provide staff assistance with the community festival, Artsplash.
• Operate the Sculpture Garden with one (1) exhibition per year.
WORKLOAD MEASURES:
Delivery of Top-Quality Services 1998-99 1999-00 2000-01 2001-02
Arts Office Events/Attendance 44/35,000 49/36,000 66/51,000 42/39,000
Community Grants Awards/Applications/Budget 21/$18,000 20/18,000 18/19,000 16/19,000
New Initiatives Grant/Budget 1/5,000 1/1,200
Educational Opportunities - Information Services 1998-99 1999-00 2000-01 2001-02
Newsletters (Issues/Distribution) 12/48,000 12/50,000 12/50,000 12/50,000
Special Publications (Per Year/Distribution) 11/24,000 17/86,000 48/60,000 52/58,000
Arts Info Line Calls (Monthly) 240 240 240 250
Diverse Economic Opportunities 1998-99 1999-00 2000-01 2001-02
Grants and Contributions $74,000 $89,050 $181,200 $68,950
SIGNIFICANT CHANGES:
None.
B-111
PROGRAM:
FUND:
PROGRAM GROUP:
SISTER CITY
GENERAL/SPECIAL REVENUE
CULTURAL ARTS ACCTNO. 0014066/1464010
PERSONNEL
MAINTENANCE & OPERATIONS
CAPITAL OUTLAY
GRAND TOTAL
FULLTIME POSITIONS
HOURLY/FTE POSITIONS
GENERAL FUND
SISTER CITY DONATIONS
TOTAL FUNDING
1999-2000
ACTUAL
0
5,842
0
2000-01
ACTUAL
0
10,396
0
2001-02
BUDGET
2,655
13,034
0
2002-03
BUDGET
2,862
10,800
0
5,842| 10,396] 15,689| 13,662
0,00
0.00
5,142
700
0.00
0;11
7,536
2,860
0.00
0.11
10,123
5,566
0.00
0.11
9,662
4,000
5,842| 10,396| 15,689| 13,662
WORK PROGRAM:
Coordinate Sister City relationship with the City of Futtsu, Japan and Karlovy Vary, Czech Republic.
PROGRAM ACTIVITIES:
Coordinate Sister City Program
• Arrange, host and conduct visits by one (1) student delegation and others as needed.
• Coordinate ongoing cultural and educational exchange projects.
Actively Pursue the Contribution of Funds for the Sister City Program.
• Coordinate programs including fund-raisers, festivals and scholarship exchange programs and raise funds for such
programs.
SIGNIFICANT CHANGES:
None.
B-112
PROGRAM:
FUND:
PROGRAM GROUP:
SPECIAL EVENTS
SPECIAL REVENUE FUND
CULTURAL ARTS ACCTNO. 1484010
PERSONNEL
MAINTENANCE & OPERATIONS
CAPITAL OUTLAY
GRAND TOTAL
FULL .TIME POSITIONS •'", - 'V ,,
HOURLY/FTE POSITIONS
1999-2000
ACTUAL
8,614
17,980
0
2000-01
ACTUAL
7,229
11,970
0
2001-02
BUDGET
9,650
23,916
0
2002-03
BUDGET
10,132
21,500
0
26,594| 19,199| 33,566| 31,632
0.00
OiOO
0;0Q
0.00
0.00
0.00
0.00
0.00
WORK PROGRAM:
Provide, within fiscal resources, a variety of performing arts programs to all Carlsbad residents.
PROGRAM ACTIVITIES:
Continue Performing Arts Programming
• Present 11 jazz concerts in four (4) quadrants.
• Produce and distribute jazz concert fundraising program.
• Present annual Mother's Day Festejando a las Madrecitas at Holiday Park.
• Provide staff for 50th Anniversary Pops concert.
Actively Pursue the Contribution of Gifts and Funds for the Arts
• Submit request for County Community Enhancement funds and Transient Occupancy Tax (TOT) funding.
• Obtain advertisements for jazz concert fundraising program.
• Assist Arts Associates in fundraising efforts at jazz concerts.
PERFORMANCE MEASURES:
• Presented 11 jazz concerts in four (4) parks with an attendance total of 33,000.
• Raised over $25,000 in fundraising contributions.
SIGNIFICANT CHANGES:
None.
B-113
PROGRAM:
FUND:
PROGRAM GROUP:
RECREATION
GENERAL/SPECIAL REVENUE
RECREATION SUMMARY
PERSONNEL
MAINTENANCE & OPERATIONS
CAPITAL OUTLAY
GRAND TOTAL
FULiMIME POSITIONS ' -. = : =
HbyRiy/FTE PX&JTIONS
1999-2000
ACTUAL
2,145,611
1,533,456
125,975
2000-01
ACTUAL
2,285,704
1,663,500
125,430
2001-02
BUDGET
2,793,391
2,268,038
309,527
3,805,042| 4,074,634| 5,370,956
= 22.00
47.04
27.00
47.11
30.00
48.92
2002-03
BUDGET
3,150,198
2,049,992
94,692
5,294,882
32,00
49.91
PROGRAM GROUP DESCRIPTION:
The Recreation Department provides diversified recreation facilities and programs for all ages of the population that
live, work and/or play in Carlsbad. The Department is responsible for planning future park sites and the operation of
current recreation programs and senior activities including youth and adult sports, special events, instructional
classes, facility rentals, aquatics, nutrition, and transportation programs.
Staff resources also support the Parks & Recreation Commission and Senior Commission, both of which act in an
advisory capacity to the City Council on matters pertaining to parks, landscape, recreation programs, senior
activities, and facilities.
KEY ACHIEVEMENTS FOR 2001-02:
• Prepared and processed the Larwin Park Master Plan including community out reach and Parks & Recreation
Commission and City Council Approval.
• Implemented an interim use strategy for Pine School and completed the required Hazardous Building Material
surveys & prepared bidding documents for structure demolition.
• Initiated Phase 2 of the Carillo Ranch Community Park.
• Received council endorsement of a strategic plan for the Recreation Department.
• Continued to enhance the Opportunity Grants Scholarship Program to over 50 community children, which
afforded them the opportunity to participate in recreation programs they would not otherwise be able to enjoy.
• Completed the design phase for the Aviara Community Park.
• Presented a funding strategy for the implementation of a citywide trails program.
KEY GOALS FOR 2002-03:
Top Quality Services
• Continue to Implement the use of customer surveys to evaluate and improve customer satisfaction.
• Conduct customer service training for employees.
• Generate sponsorship programs and fundraising activities.
• Promote the use of volunteers in providing City services.
• Maintain a Capital Improvement Program (CIP) that provides for development of recreation facilities.
• Annually revise CIP Budget.
• Enhance service delivery through effective location and development of recreation facilities and programs such
as Aviara Community Park, Carrillo Ranch Phase 2, Pine School, Larwin Park, the Stay-N-Play Program and
Citywide Trails System.
• Develop standards for current and future facilities that maintain top-quality, cost-effective delivery for recreation.
• Implementation of the Recreation Department Strategic Plan.
• Maintain an active role in supporting areas of mutual benefit between City and school districts, i.e., Joint Use
Agreements for use and maintenance of activity playfields and Community Swim Complex.
B-114
PROGRAM: RECREATION PAGE TWO
FUND: GENERAL/SPECIAL REVENUE
PROGRAM GROUP: RECREATION SUMMARY
KEY GOALS FOR 2002-03 (Continued):
Finance
• Provide recreational activities, facilities and other special events, which support local business and enhance
transient occupancy taxes (TOT) and sales tax revenue such as the triathlon, sport tournaments, and swim
meets.
• Prepare marketing packet promoting Carlsbad's public/private facilities and distribute to prospective user
groups.
• Provide a wide variety of revenue generating quality recreation opportunities to the public, i.e., special events,
youth and adult sports, educational classes, aquatic programs, day-trippers, lagoon permits, and facility rentals.
Learning
• Prepare monthly agendas for Parks and Recreation, and senior commissions that address relevant issues and
inspire community involvement.
• Continually monitor the Citywide interactive web page to display current recreation opportunities over the
Internet.
• Provide a wide variety of instructional classes for all ages and promote educational classes through distribution
of the Carlsbad Community Services and Recreation Guide three times per year.
• Provide and encourage a variety of professional training opportunities to all staff members.
• Create cross-training opportunities within the Recreation Department and across major service areas where
feasible.
• Provide the necessary tools required for employees to perform effectively.
Balanced Community Development
• Monitor and annually report on the status of the parks performance standard of the Growth Management Plan
and the implementation progress report for the Parks and Recreation element of the General Plan.
Parks/Open Space/Trails
• Implementation of a Citywide Trails Master Plan, including acquisition and development.
• Support and assist, where possible, the volunteer trails development program.
• Process the Aviara Community Park construction.
• Initiate and monitor Phase II development of Carrillo Ranch.
• Process the development of Larwin Park.
• Continue the master planning requirements for Alga Norte Park.
• Initiate the master planning process for Pine School.
• Secure acquisition of 10-15 acres of park property in the northeast quadrant.
B-115
PROGRAM:
FUND:
PROGRAM GROUP:
PARK PLANNING
& RECREATION MANAGEMENT
GENERAL FUND
COMMUNITY SERVICES ACCT NO. 0014510/0014545
PERSONNEL
MAINTENANCE & OPERATIONS
CAPITAL OUTLAY
GRAND TOTAL
FULLttME.ROSlTlONS , . . .
HOURLY/FTE POSITIONS
1999-2000
ACTUAL
358,017
195,066
20,811
2000-01
ACTUAL
394,475
194,231
1 1 ,466
2001-02
BUDGET
622,587
622,341
16,582
2002-03
BUDGET
721,911
561 ,970
8,300
573,894) 600,172] 1,261, 510| 1,292,181
: 3.00
: , 0.98
, 4.00
0.75
,7.00
0.25
7,00
: 0.75
WORK PROGRAM:
The Park Planning and Recreation Management Division provides administrative support for the City's ongoing recreation
programs and park development efforts. The Division also provides staff support to the Parks and Recreation
Commission which acts in an advisory capacity to the City Council to insure that top-quality park facilities and recreation
programs are developed and sustained for the benefit of those who live, work and/or play in Carlsbad.
PROGRAM ACTIVITIES:
Parks and Recreation Commission
This Division provides staff support to facilitate the effectiveness of the Parks and Recreation Commission in its goal
to implement the intent of the Parks and Recreation Element of the General Plan and advise the City Council on
associated matters.
• Prepare Parks and Recreation Commission Agendas and conduct meetings which address relevant issues,
encourage public input and foster public education on matters of parks and recreation and other associated civic
matters.
• Implement and/or process recommendations by the Commission for City Council consideration.
• Provide staff support to committees of the Commission which require more detailed review of issues relating to
park development, facilities, recreation programs, landscape, street trees, open space, and amenity goals and
guidelines.
• Conduct Commission workshops to improve the expertise and effectiveness of the Commission.
Administrative Services
Provide the required administrative support to a division with 32 full-time positions and approximately 50 hourly/full-
time equivalent positions, which operate with a budget of approximately 4.6 million.
• Maintain timely processing of special project requests, citizen concerns, departmental reports, City Council
agenda bills, resolutions and ordinances. Prepare and monitor departmental and individual goals and
objectives, budget administration for expenditures and revenue generation.
• Recommend and process personnel appointments, promotions, assignments and disciplinary action when
warranted. Provide on-going support to management, general and part-time employees. Implement the
services of contractual employees.
• Implement and maintain the strategic planning process for the Recreation Department.
• Facilitate a customer service training and orientation program for all new department employees
B-116
PROGRAM: PARK PLANNING PAGE TWO
& RECREATION MANAGEMENT
FUND: GENERAL FUND
PROGRAM GROUP: COMMUNITY SERVICES ACCT NO. 0014510/0014545
PROGRAM ACTIVITIES (Continued):
Park Acquisition, Planning and/or Development
Ensure adequate park acquisition, development and rehabilitation in order to meet the park performance standards
of the Growth Management Program. Provide for current and future community needs by addressing changing
recreation trends.
• Monitor and implement existing park agreements.
• Construct phase II of the Carrillo Ranch Master Plan.
• Coordinate and monitor the Capital Improvement Program (CIP) budget submittals for current and future park
development projects.
• Initiate the park planning process for the Pine School property.
• Finalize acquisition of acreage in the Northeast Quadrant to provide additional activity playfields.
• Provide staff support for the development of the municipal golf course.
• Develop the Aviara Community Park site Master Plan.
• Complete the Alga Norte park master plan process.
• Process the actions required to create a Citywide Trail System (land acquisition, maintenance system,
development, volunteers, etc.).
Recreation Programs
Manage the implementation, performance and adequacies of recreation programs.
• Provide a wide variety of recreation programs and special events for all segments of the population who live,
work and/or play in Carlsbad.
• Monitor and evaluate the effectiveness of recreational programs through the use of participant surveys.
• Maintain a self-sustaining percentage of recreational programs as recommended by the City Council.
• Prepare and distribute the Community Services & Recreation Guide three (3) times per year.
• Continually evaluate and implement the fee structure for recreation programs and facility rentals, in an effort to
sustain a competitive advantage over the private sector for similar services.
SIGNIFICANT CHANGES:
None.
B-117
PROGRAM:
FUND:
PROGRAM GROUP:
RECREATION FEE SUPPORTED
GENERAL
RECREATION ACCT NO. 0014515, 0014521-28
PERSONNEL
MAINTENANCE & OPERATIONS
CAPITAL OUTLAY
GRAND TOTAL
FULLTIME POSITIONS ••-.,••
HOURLY/FTE POSITIONS
1999-2000
ACTUAL
722,175
718,136
33,505
1,473,816
9.00
21.11
2000-01
ACTUAL
735,129
783,200
4,577
1,522,906
10:00
22.46
2001-02
BUDGET
827,639
853,432
0
1,681,071
10.00
24.29
2002-03
BUDGET
994,956
817,531
0
1,812,487
¥ =•-• \ 10.00
24.64
WORK PROGRAM:
The Recreation Fee Supported Division provides comprehensive opportunities for meeting the recreational needs
and interests of the community by providing self-sustaining fee-supported programs for all segments of the
population including those that live, work and/or play in Carlsbad.
PROGRAM ACTIVITIES:
Recreation programs include: enrichment classes, adult excursions, youth and adult sports, special events, youth
day camps, and after school programs.
The fee-supported division provides year around recreational programs for all ages, preschool to seniors, including
program design, planning, implementation and evaluation.
Review proposals and negotiate contracts with
instructors.
Schedule facilities for programs.
Prepare and distribute marketing materials.
Evaluate programs and analyze data on an ongoing
basis.
Prepare financial and revenue reports.
Research and implement program opportunities.
Conduct fee market studies on an ongoing basis.
Coordinate with school districts for youth and teen
programming.
Recruit, train and reward volunteers.
Generate program sponsors.
Utilize sports professionals to enhance program
quality.
Provide scholarships for Carlsbad resident youths.
WORKLOAD MEASURES:
2000-01
Estimate
2001-02
Projected
2002-03 2000-01
Estimate
2001-02
Projected
2002-03
Enrichment Classes
Conducted
Enrolled
Revenue
Daytrippers
Trips Conducted
Participants
Revenue
Camps
Camps
Participants
Revenue
1,650
16,600
$447,842
34
876
$44,566
39
793
$92,800
1,620
16,200
404,000
32
900
45,000
50
1,080
98,000
1,650
16,700
405,000
8
350
23,000
53
1,280
97,000
Youth Sports
Teams
Participants
Spectators
Revenue
Adult Sports
Teams
Participants
Spectators
Revenue
62
1,000
12,000
$36,000
320
4,900
30,000
$86,470
65
1,050
13,000
32,000
325
5,000
30,000
86,500
70
1,100
15,000
36,000
328
5,100
30,000
86,500
B-118
PROGRAM:
FUND:
PROGRAM GROUP:
RECREATION FEE SUPPORTED
GENERAL
RECREATION
PAGE TWO
ACCTNO. 0014515,0014521-28
Pre-school Classes
Conducted
Enrolled
Revenue
Fields
Maintained
Stav 'n1 Plav
Weeks
Participants
Revenue
2000-01
166
1,900
$112,652
Estimate
2001-02
167
1,900
117,766
Projected
2002-03
167
1,900
122,650
Special Events
Events
Participants
Revenue
2000-01
9
22,030
$61,940
Estimate
2001-02
10
24,050
82,000
Projected
2002-03
11
27,650
85,000
Community Volunteers
14
30
725
$1,000
14
32
800
$1,250
14
32
850
$1,500
Volunteers
Hours
Kids Camp
Camps
Participants
Revenue
1,170
8,200
11
1,045
$82,600
1,190
10,100
13
1,235
$123,000
1,220
10,200
13
1,625
$162,000
KEY GOALS FOR 2002-03:
Top Quality Services
• Begin the initial phases to implement the Recreation Department's Strategic Plan; the Strategic Plan will
enhance access to open space, provide safe places to gather, create life-ling learning opportunities, and build a
stronger community.
• Conduct customer service training for all staff to broaden their knowledge and improve service delivery.
• Measure customer satisfaction of service delivery through user surveys and analyze responses to improve
service delivery.
Finance
• Recruit, train and recognize volunteers through an annual awards program in order to improve service quality
and reduce program costs.
• Recruit and maintain program sponsors to promote local businesses and reduce operational costs.
• Provide a wide variety of revenue generating quality recreation opportunities, which support local businesses
and enhance transient occupancy taxes (TOT) and sales tax opportunities.
• Promote cooperative fundraising projects like "Clean Sweep" to provide volunteer assistance in the Community
and raise funds for scholarship programs.
Learning
• Collaborate with school districts to provide City and school facilities for youth programs including teen
dances, Stay 'N' Play and Grad Mite.
• Promote educational classes and programs for the community through the Community Services
brochure.
• Enhance knowledge and skills of staff by providing ongoing training and educational opportunities.
SIGNIFICANT CHANGES:
The increase in personnel costs is to fund the Recreation reorganization that was approved by Council in
5/2002.
B-119
PROGRAM:
FUND:
PROGRAM GROUP:
RECREATION-AQUATICS
GENERAL
RECREATION ACCTNO. 0014520
PERSONNEL
MAINTENANCE & OPERATIONS
CAPITAL OUTLAY
GRAND TOTAL
POLL TJte POSITIONS ;
HOXMEWFTE POSITIONS : '
1999-2000
ACTUAL
277,994
113,411
12,677
404,082
, 2.00
6.80
2000-01
ACTUAL
280,515
148,222
103,651
2001-02
BUDGET
290,215
124,953
153,884
2002-03
BUDGET
325,004
132,450
32,000
532,388] 569,052 1 489,454
2.00
'• " 7.25
3. 2.00
7.25
3.00
6.89
WORK PROGRAM:
The Aquatics Program provides for the operation of an attractive and safe community swim complex, which offers
comprehensive instruction and training, competition, and recreational swimming to all segments of the population
who live, work, and/or visit in Carlsbad.
PROGRAM ACTIVITIES:
Lessons/Training
Provide instruction in general aquatic, swimming, and diving skills for all ages and abilities; provide education and
training to the general public and City employees in first aid, CPR, and water rescue skills; serve as a North County
certification/training site for men and women wishing to qualify for employment at public swimming pools.
Fun and Fitness
Provide opportunities for recreational swimming, fitness lap swimming, and family-oriented aquatic special events.
WORKLOAD STATISTICS:
Actual
2000-01
Estimate
2001-02
Projected
2002-03
Instructional Lessons
Lane/Hours
Classes Conducted
Registered, Resident
Registered, Non-Resident
Revenue
Carlsbad High School P.E.
Lane/Hours
Participation
Recreation and Lap Swim
Lane/Hours
Daily Admissions
• Youth
• Adult
• Season Pass Administration
• Revenue
2,268
233
1,422
94
$38,213
852
2,126
18,985
5,818
7,135
16,149
$56,861
2,250
225
1,495
85
$38,290
664
2,030
16,425
5,400
6,000
16,000
$51,900
2,300
233
1,535
90
$42,000
840
2,100
16,715
5,500
7,005
17,100
$55,500
B-120
PROGRAM:
FUND:
PROGRAM GROUP:
RECREATION-AQUATICS
GENERAL
RECREATION
PAGE TWO
ACCTNO. 0014520
WORKLOAD STATISTICS (Continued):
Actual Estimate Projected
2000-01 2001-02 2002-03
Carlsbad Swim Masters
Lane/Hours 3,617 3,228 3,565
Participation 11,837 10,652 11,900
Revenue $37,178 $33,678 $35,000
Aquatic Exercise
Lane/Hours 230 210 230
Participation 1,336 1,200 1,200
Revenue $4,826 $3,800 $3,800
Carlsbad High School Teams
Lane/Hours 4,453 3,841 3,900
Participation 7,677 6,677 6,600
Revenue $17,464 $15,964 $15,500
North Coast Aquatics
Lane/Hours 2,735 2,537 2,500
Participation 8,631 7,976 7,900
Revenue $6,200 $5,610 $6,200
North Shore Aquatics (Age Group Water Polo)
Lane/Hours 1,126 1,000 1,000
Participation 1,356 1,200 1,200
Revenue $4,506 $4,200 $4,500
Carlsbad Water Polo (Boys Age Group Water
Polo) 1,560 1,250 1,560
Lane/Hours 2,055 900 2,055
Participation $4,500 $2,900 $4,500
Revenue
KEY GOALS FOR 2002-03:
Top Quality Services
• Be a city that provides exceptional aquatic services, programs, and facilities on a daily basis.
Learning
• Promote and support continuous aquatic training opportunities within the community and the City organization.
• Continue and expand the "Aquatic Trainee" program to help insure continued qualified staffing of aquatic
programs.
SIGNIFICANT CHANGES:
A full-time Office Specialist II position will be added to the staff the front counter of the Swim Complex.
B-121
PROGRAM:
FUND:
PROGRAM GROUP:
RECREATION - AGUA HEDIONDA
LAGOON PERMITS
GENERAL
RECREATION ACCTNO. 0014530
PERSONNEL
MAINTENANCE & OPERATIONS
CAPITAL OUTLAY
GRAND TOTAL
BULtatME POSITIONS , ,!
H0URLY/FTE POSITIONS
1999-2000
ACTUAL
10,505
1,655
0
12,160
r 0.00
•-• "•'..- 0.50
2000-01
ACTUAL
10,838
3,139
0
13,977
0.00
0:50
2001-02
BUDGET
27,427
3,373
0
30,800
0.00
0.50
2002-03
BUDGET
15,302
3,576
0
18,878
0.00
0.50
WORK PROGRAM:
Provides for the Agua Hedionda Lagoon Permits Program. All vessels on the water are required to obtain a valid
City use permit. The Permits Clerk supports this function.
PROGRAM ACTIVITIES:
Permits
Issue annual lagoon use permits, verify and monitor
DMV registration, and coordinate with the Police
Department to publish and distribute information
regarding use, rules and regulations of the lagoon.
Lagoon Clean-Up Program
Coordinate and oversee bi-annual Lagoon Clean-Up
Days (June/October).
SIGNIFICANT CHANGES:
None.
WORKLOAD STATISTICS:
Annual Permits
Daily Permits
Revenue
2000^01
350
289
$22,375
Estimated
2001-02
Projected
2002-03
365 350
293 280
$23,900 $22,500
B-122
PROGRAM:
FUND:
PROGRAM GROUP:
RECREATION OPERATIONS
GENERAL
RECREATION ACCTNO. 0014540,0014541,
0014542, 0014543
PERSONNEL
MAINTENANCE & OPERATIONS
CAPITAL OUTLAY
GRAND TOTAL
FULL TIME POSITIONS :>: ,
rtOURLY^FTE^POSmONS
1999-2000
ACTUAL
503,452
130,549
38,076
672,077
5 5.00
11.13
2000-01
ACTUAL
578,387
155,949
5,736
2001-02
BUDGET
718,362
157,729
130,861
2002-03
BUDGET
760,803
158,262
26,392
740,072 1 1,006,952 1 945,457
8.00
9.63
8.00
9.63
, iB.OO
9.63
WORK PROGRAM:
This division provides operational support for the Recreation Department including the operation of three community
centers and City facilities used by a variety of City departments and the general public for recreational use and
meetings. In addition, the Operations Division also provides maintenance to the many athletic fields owned by the
City and school districts serving the Carlsbad population.
PROGRAM ACTIVITIES:
Information and Enrollment Services
Staff provides information and registration services to the public on Recreation Department programs and facilities.
• Enroll participants via phone, mail and in-person for classes, special events and sports leagues.
• Collect and account for program revenue.
• Provide ongoing information and referral to the Community.
Facilities Operation
Staff coordinates public use of recreational facilities.
• Process applications for use of meeting rooms, picnic areas, athletic fields, gymnasiums and tennis courts.
• Crews maintain ballfields at school sites and Community centers and other park areas.
• Staff coordinates classes, meetings, dedications, and other functions at Community centers and additional City
facilities.
• Attendants attend to customer service issues and provide general clean-up and associated maintenance at
facilities.
Supervision
Supervisory staff coordinates operations of the Community centers and satellite facilities.
• Staff recruitment and development.
• Provides staff training.
• Serves as liaison to various Community organizations and Citywide committees.
• Respond to customers concerns and requests.
WORKLOAD MEASURES:
Reservations processed:
Number of Facility Users:
Revenue:
Number of Fields Maintained:
2000-01
3,152
964,980
$110,660
17
Estimate
2001-02
3,060
950,000
$123,000
17
Projected
2002-03
3,090
1,050,000
$128,000
17
B-123
PROGRAM: RECREATION OPERATIONS PAGE TWO
FUND: GENERAL
DEPARTMENT: RECREATION ACCTNO. 0014540,0014541,
0014542, 0014543
KEY GOALS FOR 2002-03:
Top Quality Services
• Begin the initial phases to implement the Recreation Department's Strategic Plan; the Strategic Plan will
enhance access to open space, provide safe places to gather, create life-long learning opportunities, and build a
stronger community,
• Conduct customer service training for employees to broaden their knowledge and improve service delivery
skills.
• Measure customer satisfaction of service delivery through user surveys and analyze responses to improve
service delivery.
• Monitor and maintain the Capital Replacement Program to provide safe, top-quality, equipment at all recreation
facilities and conform to City budget standards.
• Facilitate the equitable distribution of athletic fields by partnering with Carlsbad non-profit sports organizations to
ensure customer satisfaction of Carlsbad field users.
Balanced Community Development
• Prepare and distribute a marketing packet, which promotes Carlsbad hotels, restaurants, amenities, and City
facilities to all non-resident athletic groups that use Recreation Department facilities.
• Enhance revenues by promoting and facilitating the rental of City facilities to the public as an attractive and
competitive alternative to private sector facilities.
SIGNIFICANT CHANGES:
The addition of one (1) full-time Management Assistant position to enhanpe the administration of departmental
operations.
B-124
PROGRAM:
FUND:
PROGRAM GROUP:
SENIOR PROGRAMS
GENERAL/SPECIAL REVENUE
RECREATION
ACCT NO. 0014570,1434567,
1444567, 191XXX
PERSONNEL
MAINTENANCE & OPERATIONS
CAPITAL OUTLAY
GRAND TOTAL
FULL TIME POSITIONS . . ;
HOURLWfE POSITIONS
GENERAL FUND
DONATIONS
GRANTS
TOTAL
1999-2000
ACTUAL
273,468
374,639
20,906
669,013
3.00
6,52
339,061
120,065
209,887
669,013
2000-01
ACTUAL
286,360
378,759
0
665,119
3.00
:6.52
366,497
87,860
210,762
2001-02
BUDGET
307,161
506,210
8,200
821,571
3.00
7,00
487,446
136,200
197,925
665,119| 821,571
2002-03
BUDGET
332,222
376,203
28,000
736,425
3.00
: . , 7.50
736,425
0
0
736,425
WORK PROGRAM:
To provide a broad range of services and activities designed to foster independence, enhance the quality of life and
provide opportunities for lifelong learning and involvement for older adults in the Carlsbad area.
PROGRAM ACTIVITIES:
Education
Arrange for classes, seminars and other learning opportunities on topics pertinent to the concerns and interests of the
aging population and coordinate computer classes to teach the basics of computers (i.e., "Windows").
• Continue computer lab with open hours for seniors to drop in and receive training and technical advice.
• Provide seminars on estate planning, topics of interest and concern to seniors, personal safety, etc.
• Provide ongoing information and referral to Community resources.
• Provide ongoing classes in computer usage (e-mail, Internet, etc.).
Recreation
Offer excursions, special events and activities of particular interest to the mature adult, which promote social interaction.
• Continue the development of programs/groups that appeal to people with similar interests, i.e., Walking Group, PC
Users Groups, Writers Groups, Discussion Groups, etc.
• Provide day trips to local attractions, utilizing rented buses as well as public transportation (i.e., the Coaster, Trolley,
etc.).
Personalized Assistance
Coordinate the provision of professional services necessary to maintaining an independent lifestyle.
• Offer tax assistance to over 500 seniors.
• Arrange for free legal advice for over 200 seniors.
• Arrange for assistance with health insurance decisions.
Health Services
Arrange for screenings, services, classes, and lectures that promote healthy living.
• Monthly blood pressure checks, glucose and diabetes testing and cholesterol testing.
• Flu shots.
• Provide a minimum of four "special" health screenings, i.e., skin cancer, hearing, podiatry, cholesterol, etc.
• Continue offering body conditioning, exercise yoga, and dance for seniors.
B-125
PROGRAM: SENIOR PROGRAMS
FUND: GENERAL/SPECIAL REVENUE ACCT NO. 0014570,1434567,
PROGRAM GROUP: RECREATION 1444567,191XXX
PROGRAM ACTIVITIES (Continued):
Senior Grants
• Provide a minimum of $30,000 in nutritious lunches.
• Provide a minimum of $10,000 in delivered meals to the homes of Carlsbad's frail seniors.
• Provide over 8,500 rides to seniors who have no other means of getting to the Senior Center, shopping, medical
visits, and other necessary appointments.
Administration
Coordinates all operations of the senior center: staffing, volunteer recruitment, facility rentals, and grants management.
• After-hours facility rentals.
• Staff scheduling.
• Volunteer recruitment and training.
• Budget management.
• Senior Commission.
SIGNIFICANT CHANGES:
Effective 7/1/2002 the Senior Nutrition Grant revenues and expenditures have been incorporated into the General fund
budget.
B-126
\jJU _£AOsJ.£}JJ
PROGRAM:
FUND:
PROGRAM GROUP:
PUBLIC WORKS
VARIOUS
VARIOUS SUMMARY
PERSONNEL
MAINTENANCE & OPERATIONS
CAPITAL OUTLAY
GRAND TOTAL
FULL TIME PORTIONS > ... -v
HOURLY/RE POSITIONS
1999-2000
ACTUAL
10,797,482
26,208,276
1,369,366
38,375,124
, ;, 177,75
13.25
2000-01
ACTUAL
11,033,212
27,872,957
1,261,737
40,167,906
177,75
14J5
2001-02
BUDGET
12,555,292
36,942,006
2,225,129
51,722,427
189,75
13,60
2002-03
BUDGET
13,486,327
35,016,486
1,933,167
50,435,980
191,75
14.45
Maintenance &
Operations
65%
Engineering
PWAdrrin Services
2% 10%
General Services
21%
Storm Water
Protection
2%
B-127
PROGRAM:
FUND:
PROGRAM GROUP:
PUBLIC WORKS ADMINISTRATION
GENERAL
PUBLIC WORKS ADMINISTRATION ACCTNO. 0016010
PERSONNEL
MAINTENANCE & OPERATIONS
CAPITAL OUTLAY
GRAND TOTAL
FULL 'TIME POSITIONS :
HQURLY/FTE POSITIONS
1999-2000
ACTUAL
456,073
143,583
13,042
612,698
4,00
0,00
2000-01
ACTUAL
337,905
150,506
0
488,411
3.00
0.00
2001-02
BUDGET
365,349
260,566
12,000
2002-03
BUDGET
527,904
279,171
0
637,915] 807,075
3,50
0.00
6;40
0:00
WORK PROGRAM:
Provide leadership and coordination for Public Works programs; plan resources and facilities; manage all budget,
fiscal and personnel matters; coordinate programs with local, State and Federal governments and support City
boards, committees and commissions. Public Works includes Engineering Services, Solid Waste Management,
Traffic Signal Maintenance, General Services (Parks Maintenance, Facilities Maintenance, Fleet Maintenance,
Median Maintenance, Street Tree Maintenance), and Maintenance and Operations (Water Operations, Recycled
Water, Sanitation Operations, Buena Vista Channel Maintenance, Street Maintenance, Traffic Signal Maintenance,
Street Lighting, and Solid Waste Management).
PROGRAM ACTIVITIES:
Budget Preparation
• Coordinate department budget activities.
Performance Management
• Prepare goal documentation for Public Works major service area.
Strategic Planning
• Implement strategic plan and Public Works programs to meet current and long-range goals.
Maintenance Management and Quality Control
• Continue development of comprehensive systems inventory, maintenance standards and work reporting system.
KEY ACHIEVEMENTS FOR 2001 - 02:
• Designed a comprehensive public information an education program for the Public Works MSA.
• Implemented an organizational designed to ensure consistency of business practices and quality control across
the department.
• Designed and implemented an executive reporting system reflecting the performance of the entire Public Works
MSA.
• Implemented a benchmarking partnership program for incorporation into the Public Works performance
measurement program.
• Completed 100% design of Public Works Center.
• Completed implementation of automated RFA System in Maintenance and Operations.
B-128
PROGRAM: PUBLIC WORKS ADMINISTRATION PAGE TWO
FUND: GENERAL
PROGRAM GROUP: PUBLIC WORKS ADMINISTRATION ACCTNO.OOISOIO
KEY GOALS FOR 2002-03:
Top Quality Services
• Request for Action (RFA) System: Continue Citywide rollout of the RFA System that allows the City to provide
quick and effective response to citizen calls for service.
• Computerized Maintenance Management System (CMMS): Increased efficiency in the provision of maintenance
services of Public Works assets and reduction of overall lifecycle costs for City infrastructure. Fully implement
the CMMS into the Streets Division of Public Works.
• Standards of Care: Develop a Standards of Care program for public facilities that will define the elements and
provide an evaluation program, which will monitor and ultimately measure the quality of the required care for
facilities and to ensure the delivery of top quality service.
• Capital Project Tracking: Implement Microsoft Project 2002 to track the resource allocation and scheduled
progress of all Capital Improvement Projects in the City.
• Performance Measurement: A Public Works performance measurement program that includes effective
measures, solid benchmarks and stable benchmarking partners.
• Public Works Maintenance Classification Series: A maintenance classification structure that allows for flexibility
of job assignments and provides opportunities for professional development.
Communication
• Public Works Education & Outreach: Increase citizen awareness about Public Works, educate them on what
we do and how well we do it and improve our image.
• Public Works Website: Enhancement of website for Public Works and Planning.
SIGNIFICANT CHANGES:
Several positions were reallocated from other areas of public works to Public Works Administration to centralize the
administrative function.
B-129
PROGRAM:
FUND:
PROGRAM GROUP:
ENGINEERING
GENERAL/WATER & SEWER ENTERPRISE
ENGINEERING SERVICES ACCT NO. 0015710/5x15710
PERSONNEL
MAINTENANCE & OPERATIONS
CAPITAL OUTLAY
GRAND TOTAL
FULL TIME POSITIONS : . ;
HOIJRLY/FFE POSlt IONS •'-.-"-•
GENERAL FUND
SEWER ENTERPRISE
WATER ENTERPRISE
TOTAL FUNDING
1999-2000
ACTUAL
3,395,803
1,735,632
108,785
5,240,220
>5i:oo
, , 0.50
4,516,502
723,718
2000-01
ACTUAL
3,793,381
1,456,847
44,791
2001-02
BUDGET
4,126,200
2,367,150
184,241
5,295,019) 6,677,591
48.70
1.00
4,328,569
343,420
623,030
52.20
1:00
5,328,591
674,500
674,500
5,240,220) 5,295,019| 6,677,591
2002-03
BUDGET
4,154,789
1,924,890
0
6,079,679
51,70
'•:•* ,_1;00
5,266,844
349,519
463,316
6,079,679
WORK PROGRAM:
The Engineering Department supports the City Council's goals by providing high-quality service in
transportation engineering, project management, front counter operations, and construction inspection.
The Engineering Department provides services to the public and other City departments through
preparation and processing of design and construction documents and performing transportation studies.
The department is also responsible for ensuring that development and public improvements are properly
designed, constructed, and inspected while maintaining public safety and the well-being of the community.
PROGRAM ACTIVITIES:
Administration
• Coordinate and direct all divisions to ensure accomplishment of City Council Goals and Objectives,
provide administrative and clerical support to all divisions, ensure that the management reporting
system is accurately maintained and generates all reports on schedule, and provide accurate records
filed in a standardized and efficient manner.
Development Services
• Provide comprehensive engineering input for all land use development applications, process
engineering development plans and maps in a professional manner maintaining high-quality and
meeting production goals, ensure engineering questions related to land development are answered in
a timely and friendly manner.
Planning and Programs
• Coordinate the preparation of the annual update to the City's Buildout Capital Improvement Program,
update existing facility impact fee programs and assist developers with the formation of finance
districts to fund major public improvements. Administer and coordinate engineering activities for the
beach erosion, lagoon dredging, growth management monitoring, special districts program, and
facility mapping.
Design
• Design Citywide capital projects including roadways, storm water, potable water, recycled water, and
sewer systems; develop and maintain programs in five (5) areas including water resources, domestic
water systems, recycled water systems, sewer systems, and storm drain systems. For each of these
programs, Design provides a variety of services including planning, water supply and quality
monitoring, technical assistance, mapping, and facility location.
B-130
PROGRAM:
FUND:
PROGRAM GROUP:
ENGINEERING PAGE TWO
GENERAL/WATER & SEWER ENTERPRISE
ENGINEERING SERVICES ACCTNO. 0015710/5x15710
PROGRAM ACTIVITIES (Continued):
Transportation
• Review, investigate, analyze, and resolve a wide variety of transportation issues, concerns,
complaints, and inquiries. Maintain records of collision reports, speed surveys, traffic counts, and
assists in maintaining optimum traffic signal operations. Review traffic control plans, signing and
striping plans, traffic signal plans, review project submittals, provide interdepartmental coordination of
various issues, and staff the Traffic Safety Commission.
Construction Management and Inspection
• Perform construction management, administration and inspection for private grading agreements,
development improvement agreements, and capital improvement projects through the application of
uniform practices and policies, ensure construction of high-quality improvements, minimize
inconvenience to the public while ensuring safe work sites.
WORKLOAD STATISTICS:
Total Capital Improvement Program Appropriations
180,000,000
160,000,000
140,000,000
120,000,000
100,000,000
80,000,000
60,000,000
40,000,000
20,000,000
0
• New
O Carry Forward
FY 99-00 FY 00-01 FY01-02 FY 02-03
(Est.)
KEY ACHIEVEMENTS FOR 2001-02:
Rancho Santa Fe Road under construction (Olivenhain Road/Encinitas).
Cannon Road West Reach 1 completed.
Faraday Avenue completed.
Foxes Landing Sewer Lift Station completed.
Chinquapin Sewer Lift Station completed.
Overlay and reconstruct 7 miles of City streets.
Purchased 9.0 acres parcels of land for the Carlsbad Water Recycling Facility.
Developed the Carlsbad Residential Traffic Management Program and received City Council approval.
Developed Livable Streets Program.
El Fuerte 30" Water Line
Poinsettia Lane Bridge & Waterlines
KEY GOALS FOR 2002-03:
Transportation
• Continue work toward the construction of major road projects including: Cannon/College,
Faraday/Melrose, Rancho Santa Fe Road, and Poinsettia Lane.
B-131
PROGRAM: ENGINEERING PAGE THREE
FUND: GENERAL/WATER & SEWER ENTERPRISE
PROGRAM GROUP: ENGINEERING SERVICES ACCTNO. 0015710/5x15710
KEY GOALS FOR 2002-03 (Continued):
Parks/Open Space/Trails
• Complete permitting and design of Coastal Rail Trail in preparation for construction in FY04.
Water
• Construct Carlsbad recycled water facility, recycled water transmission pipelines and pump stations to
distribute water from the Phase II recycled water program.
• Update Water Master Plans per growth management data to ensure that the current planned facilities
are adequate for the existing rate of growth and future build-out.
Environmental Management
• Update Storm Drain Master Plans per the growth management data and National Pollution Discharge
Elimination System (NPDES) requirements and determine if the current planned facilities and Planned
Local Drainage Area fees are adequate for the existing rate of growth and future build-out.
• Update Sewer Master Plans per the growth management data to ensure that the current planned
facilities are adequate for the existing rate of growth and future build-out.
SIGNIFICANT CHANGES:
Two (2) positions were moved from Engineering to Public Works Administration and portions of
Development Services staff were allocated to Storm Water Protection to reflect the work they support for
that program.
B-132
PROGRAM:
FUND:
PROGRAM GROUP:
STORM WATER PROTECTION
SPECIAL REVENUE
STORM WATER PROTECTION ACCTNO. 1545710
PERSONNEL
MAINTENANCE & OPERATIONS
CAPITAL OUTLAY
GRAND TOTAL
FULL TIME POSITIONS . ,
HOURLY/FTE POSITIONS
1999-2000
ACTUAL
0
0
0
2000-01
ACTUAL
0
0
0
2001-02
BUDGET
248,397
1,582,510
42,282
2002-03
BUDGET
544,997
531,422
0
0| 0| 1,873,189| 1,076,419
0,00
0:00
0.00
0.00
6.50
0.00
, 8.60
0.00
WORK PROGRAM:
Provide leadership and coordination for Public Works programs related to storm water protection from pollution; plan
resources and facilities; manage all budget, fiscal and enforcement matters; coordinate programs with local, State
and Federal governments and support City boards, committees and commissions; ensure compliance with the
National Pollutant Discharge Elimination System (NPDES) Urban Storm Water Permit No. 2001-01 (the "Permit")
issued by the San Diego Regional Water Quality Control Board.
PROGRAM ACTIVITIES:
Industrial, Commercial. Residential and Municipal: Data Management/CIS Programs
The components of these programs include inspection of the facilities at least yearly, sampling and testing of storm water,
education using outreach materials, and enforcement of non-compliance sites. The number of Industrial sites that will be
inspected is approximately 188.
Education/Outreach and Public Participation
The Permit also requires the City conduct educational efforts and outreach to the public and focus groups regarding the new
requirements to all the different sectors. The Permit specifies in Sections F.1.d and F.2.J. that educational efforts should be
focused on city staff as well as externally. Outreach to Municipal Staff is intended to inform educate employees and city
contractors on the requirements imposed on all municipal facilities and operations.
Additional Educational efforts are outlined in Section F.4 of the Permit by specifying the target communities of the outreach
and topics to be covered. The Permit also specifies that the City and all Copermittees must include the Public by allowing
participation and input in local and regional programs.
Municipal Facilities
The Permit requires that all existing Municipal facilities be reviewed and modified, as needed, to prevent or reduce
the pollutants in runoff. This evaluation includes review of: Pollution Prevention practices, identifying all sources of
pollutants, implementing Best Management Practices and Maintaining all Storm Sewer System facilities and
structures. The Permit also requires special review of Pesticide, Herbicide, and Fertilizer use at all municipal
facilities. These requirements are found in Sections F.S.a of the Permit.
Planning & Construction
The Permit requires the City to review all Land-Use Planning for New Development and Redevelopment. This
requirement is found in section F.1 of the Permit and includes a complete review and revision, as needed, of the
General Plan. Construction activities in the City are also subject to new standards and requirements as directed in
the Permit.
Fiscal Analysis
The Permit requires an adequate funding mechanism be in place to cover the costs associated with the programs
being implemented. This will be an on-going effort to identify funding options and maintain those funding options in
future years in a manner that will consistently support these programs. The requirement is described in Section F.8
of the Permit.
B-133
PROGRAM: STORM WATER PROTECTION PAGE TWO
FUND: SPECIAL REVENUE
PROGRAM GROUP: STORM WATER PROTECTION ACCT NO. 1545710
KEY ACHIEVEMENTS FOR 2001-02:
• Prepared and submitted Carlsbad's Jurisdictional Urban Runoff Management Plan (JURMP)
• Revised applicable Municipal Code Sections to satisfy NPDES Order 2001-01 and developed an Enforcement
Response Plan.
• Environmental Programs Manager and Deputy City Attorney collaborated with Regional Copermittees to develop
a Memorandum of Understanding for long-term implementation of NPDES Order 2001-01 programs and
requirements.
• Completed Fiscal Analysis (Phase I) to determine long-term funding for the Storm Water Program
• Initiated Outreach and Education Program for Storm Water with the addition of an Internet Web page, HOT Line
enhancements and Best Management Practices brochures for residents and businesses. Conducted public
workshops, professional workshops and responded to requests for speaking engagements.
• Hiring of Senior Environmental Specialist and Environmental Specialist II completed.
• City staff training on Storm Water Protection was successfully initiated and continues.
• Environmental Program Staff completed Code Enforcement Training at Miramar College (POST 832)
• Response system to track complaints or referrals on potential storm water violations was initiated using Suit
Response Software.
• Complaint investigations established as a routine program to solve illegal discharge incidents.
• Environmental Programs Manager participated in regional workgroups and committees to represent the City's
interests: Committee Budget Committee Chair; 303(d) Workgroup member; Monitoring Subcommittee member.
• City staff participated in the establishment of the North County Outreach group.
• City staff audited all municipal facilities and implemented Best Management Practices to reduce pollutants to the
receiving waters.
• Environmental Program staff initiated coastal outfall bacteriological monitoring during wet weather season 2001.
• City's General Plan and associated Plans were amended to meet the requirements of NPDES Order 2001-01.
• Data management system initiated to track industrial and commercial facilities requiring inspection.
• City staff initiated survey of the storm drainage system to verify inventory.
• Permanent storm drain maintenance crew established in the Street Division of the Public Works Department.
KEY GOALS FOR 2002-03:
Environmental Management
• Be an environmentally sensitive community by focusing on: Clean storm water, sewage collection and
treatment, solid waste, and efficient use of energy including alternative energy.
Performance Measurement and Water Quality Strategic Plan
• Report Carlsbad Storm Water Protection Program Outcome and Performance Measurement System in
accordance with requirements of the NPDES Order 2001-01 to assess the effectiveness of the Jurisdictional
Urban Runoff Management Plan (J-URMP) prepared by the City. Implement an Impaired Water Body 303 (d)
List Water Quality Strategy and Monitoring Plan to support the de-listing of coastal lagoons by regional and
state agencies.
Outreach, Education, and Public Participation
• Implement multi-year Public Education, Outreach and Training activities in order to meet the requirements of
Carlsbad Jurisdictional Urban Runoff Management Plan (JURMP). The activities are to include limited
components of public outreach: Best Management Practices, external and internal training, and residential
audiences.
SIGNIFICANT CHANGES:
This is the second year of the Storm Water Protection Program budget. An Office Specialist II position was added
for clerical support and multiple positions were reallocated from other Public Works Departments to Storm Water
Protection to reflect their support for these program activities.
B-134
PROGRAM:
FUND:
PROGRAM GROUP:
GENERAL SERVICES
VARIOUS
GENERAL SERVICES SUMMARY
PERSONNEL
MAINTENANCE & OPERATIONS
CAPITAL OUTLAY
GRAND TOTAL
FULLTIME POSITIONS-
HOURLY/FTE POSITIONS
1999-2000
ACTUAL
2,720,590
4,060,942
1,058,609
7,840,141
5175
10.75
2000-01
ACTUAL
2,815,191
4,531,844
1,151,461
8,498,496
55.75
1325
2001-02
BUDGET
3,379,058
5,784,314
1,714,084
10,877,456
57.25
12.10
2002-03
BUDGET
3,610,297
5,711,006
1,671,500
10,992,803
58.25
12.45
PROGRAM GROUP DESCRIPTION:
The City's General Services Department is responsible for the preventative maintenance and repair of parks, school
athletic fields, City buildings and vehicles, public street trees, and medians.
PROGRAM ACTIVITIES:
Trees 8%Median 5%
Parks 28%
Vehicle
Replacement 16%
Vehicle
Maintenance 17%
Facilities 26%
KEY ACHIEVEMENTS FOR 2001 -02:
Parks Maintenance
• Planted nearly 200 five gallon trees at La Costa Canyon Park.
• Completed Dog Park.
• Competed Zone 5 (Carlsbad's Industrial Park located at Faraday Avenue and Camino Hills Drive).
• Improved safety standards to the tot lot at Poinsettia Park.
Street Tree Maintenance
• Planted 400 trees in the public right of way.
• Trimmed over 1,100 trees.
• Completed the City's Community Forest Management Plan.
• Responded to over 900 street tree work order/requests for action from citizens.
B-135
PROGRAM: GENERAL SERVICES
FUND: VARIOUS
PROGRAM GROUP: GENERAL SERVICES SUMMARY
KEY ACHIEVEMENTS FOR 2001-02 (Continued):
Median Maintenance
• Began maintaining newly landscaped medians on Carlsbad Blvd at Poinsettia.
Facilities Maintenance
• Furnished and installed a new emergency chlorine scrubber at Carlsbad Swim Complex.
• Remodeled the Snack Bar/Restroom Facility at Chase Field.
• Constructed a concrete enclosure for the emergency chlorine scrubber at the Carlsbad Swim Complex.
• Completed improvements to comply with the Americans with Disabilities Act (ADA) standards at Heritage Hall,
the Granary Building and at the Magee Park Restrooms.
• Furnished and installed a new room at Fire Station No. 5.
• Installed a new pool shell at the Carlsbad Swim Complex.
• 100% of emergency work orders were completed within 24 hours.
Vehicle Maintenance
• 100% of all internal surveys returned indicated the quality of service by fleet operations are "Good to Excellent"
in all service categories.
• Implemented a vehicle "leaner" program to staff to use when their vehicles are in the garage for preventative
maintenance services.
Vehicle Replacement
• Replaced 20 vehicles scheduled for replacement in the City's fleet.
• Purchased 4 additional vehicles that were approved in the Capital Outlay Budget.
KEY GOALS FOR 2002-03:
Top Quality Services
• Develop a Standards of Care program for the filed operations of General Services and an evaluation program to
monitor and ultimately measure the department's performance.
• Improve operational efficiencies by developing programs/plans to improve proficiencies identified by the
department's Maintenance Management Program.
• Achieve Fleet's performance measurement benchmark for completed scheduled preventive maintenance work
orders and availability of units by implementing the Action Plan identified in the 2002 State of Effectiveness
Report. In addition, determine the overall effectiveness of Fleet's Preventive Maintenance Program and identify
improvements, if warranted.
Environmental Management
• Implement a program that maximizes the use of available natural resources, introduces species and age
diversity, reduces tree stress factors, and provides an increase level of care that will reinvigorate trees in
Carlsbad.
B-136
PROGRAM:
FUND:
PROGRAM GROUP:
PARK MAINTENANCE
GENERAL
GENERAL SERVICES ACCTNO. 0015020
PERSONNEL
MAINTENANCE & OPERATIONS
CAPITAL OUTLAY
GRAND TOTAL
FULLTtME.POSiTlONS' , < - , „-
HOURLY/FTE POSITIONS
1999-2000
ACTUAL
1,011,992
1,319,343
26,062
2000-01
ACTUAL
1,051,111
1,475,763
35,586
2,357,397| 2,562,460
. . 19J5
7:50
20.15
7.75
2001-02
BUDGET
1,158,882
2,096,776
154,351
3,410,009
20.15
7.35
2002-03
BUDGET
1,310,584
1,894,913
0
3,205,497
21.35
7,15
WORK PROGRAM:
Maintain, preserve and enhance 300+ acres of park facilities, school athletic fields, beach accesses, and landscapes
at various civic facilities. This includes the maintenance of eight Community parks and 26 special use areas.
Manage over 625 acres of open space/undeveloped areas and provide services to other departments as well as
Community groups. Also included is the maintenance of an additional 13 acres of landscape/hardscape at the
recently acquired Farmers Insurance Building and an additional 20 acres at Carrillo Ranch.
PERFORMANCE MEASUREMENTS:
Benchmark
One hundred percent (100%) of safety work orders are addressed within 24-hours of being identified/reported.
"Addressed" means a safety work order will be inspected and assigned a course of action and any immediate
safety hazard resolved.
Result
One hundred percent (100%) of safety work orders were addressed within 24-hours of being identified/reported.
Benchmark
Ninety percent (90%) of customers rate Park Maintenance services as "Good" or "Excellent" (4 on a 1-5 scale) in
all customer service survey categories
Result
Parks Division
(Condition of Facilities)
Sports Fields/Courts
Tot Lots/Playgrounds
Picnic Areas
Landscaping/Fields
Restrooms
Average Rating
4.4
4.3
4.3
4.2
4.1
"Good" or "Excellent"
(Percent of Responses)
91%
89%
86%
82%
77%
PROGRAM ACTIVITIES:
Turf and Landscape Maintenance
• Direct management of 112 acres of turf and 162 acres of landscaping. Duties include mowing, fertilization,
renovation, re-planting, trimming, pesticide application, raking leaves/debris, turf sweeping, weeding cultivation,
edging, aerating, re-seeding, irrigation programming maintenance, and equipment maintenance.
B-137
PROGRAM:
FUND:
PROGRAM GROUP:
PARK MAINTENANCE
GENERAL
GENERAL SERVICES
PAGE TWO
ACCTNO. 0015020
PROGRAM ACTIVITIES (Continued)
Restroom Maintenance/Litter Control/Picnic Area Services
• Inspect, maintain, clean, paint, and repair 16 separate restroom facilities (as well as eight portable units) 5 plus
times per week. Cleaning, restocking, sanitizing, painting, and plumbing repairs comprise the duties of this
activity. Also associated with this activity is litter control; all parks, beach accesses and beach areas are
cleaned 4 plus times weekly to remove all litter and service all trash receptacles.
Court/Field/Tot Lot Maintenance
• Maintain 28 tennis courts (21 lighted), 17 basketball courts, 16 soccer fields, and 26 softball/baseball fields. All
athletic courts are cleaned/inspected on a weekly basis. Duties involve washing down, sweeping off, blowing
off, fence inspections/repairs, and paving surface inspections. In addition, this activity includes weekly
maintenance of all tot lots. This includes sand raking/leveling, sand roto tilling, play equipment inspection and
repair, and the necessary documentation of such actions.
Irrigation Maintenance
• Maintain all facility landscape irrigation systems. This includes programming over 100 different controllers, with
over 1,396 valves. Duties include replacement, repair, trouble shooting, and data entry/ programming using the
centralized irrigation system.
Open Space Maintenance
• Provide maintenance activities to City-owned open space, and areas of additional maintenance responsibilities.
Duties include trash removal, clean-up and weed abatement.
Miscellaneous Maintenance/Repair and Special Requests
• These activities, which are difficult to measure, include repair and upgrading park structures, facilities, play
equipment and fencing, and the installation of play equipment, bleachers, drinking fountains, soccer goals, trash
enclosures, concrete work, and painting projects. These additional activities also include special projects and
requests by the Community for turf installation, sculpture installation, various redevelopment requests, and
Community garden needs. The total amount of time spent on these activities amounts to approximately 12% of
park maintenance activities.
WORKLOAD STATISTICS:
NUMBER OF
COURTS/FIELDS/TOT LOTS
MAINTAINED
28
15
TURF & LANDSCAPE
MAINTENANCE
Picnic Area
7%
TwtnU Ball Fl*ld* Tot Lot* Buk»tb«ll Landscape 55%
SIGNIFICANT CHANGES:
Addition of a Park Maintenance Worker I to continue maintenance at Poinsettia Park, previously performed by
temporary employees.
B-138
PROGRAM:
FUND:
PROGRAM GROUP:
FACILITIES MAINTENANCE
GENERAL
GENERAL SERVICES ACCTNO. 0015060
PERSONNEL
MAINTENANCE & OPERATIONS
CAPITAL OUTLAY
GRAND TOTAL
FULL TOE 1?OSiTfONS ".*•'•>:
HOURLY/RE POSITIONS
1999-2000
ACTUAL
773,726
1,059,860
22,743
1,856,329
17.00
0.50
2000-01
ACTUAL
843,069
1,194,399
30,919
2,068,387
20,40
, . 1.00
2001-02
BUDGET
1,168,571
1,319,441
91,515
2,579,527
20.40
1.50
2002-03
BUDGET
1,191,669
1,435,907
64,500
2,692,076
: 20,60
2.05
WORK PROGRAM:
Maintain City facilities to provide safe, attractive buildings for the City to conduct its business and provide services to
the Community.
PERFORMANCE MEASURES:
• Benchmark
Ninety percent (90%) of internal surveys returned indicate the overall quality of service by Facilities Maintenance
at "Very Good" to "Excellent" in all survey categories.
Result
Eighty-five percent (85%) of internal surveys returned indicated the overall quality of service by Facilities
Maintenance are "Very Good" to "Excellent" in all survey categories.
• Benchmark
Ninety percent (90%) of priority one work orders completed within 24-hours; ninety percent (90%) of priority two
work orders completed within 72-hours.
Result
One hundred percent (100%) of priority one work orders completed within 24-hours; ninety-seven percent (97%)
of priority two work orders completed within 72-hours.
PROGRAM ACTIVITIES:
Building Maintenance
• Perform repairs and alterations as required to maintain and operate City facilities at a professional level.
Perform emergency repairs to eliminate hazards of unsanitary conditions and reduce liability. Remodel and/or
renovate City facilities to accommodate programmatic changes for City departments. Provide assistance in the
relocation of staff and/or office furnishings as required. Implement and manage a preventative maintenance
program for major mechanical systems, roofing and painting.
Custodial Services
• Provide professional level custodial services for all City facilities by utilizing City staff in the major buildings and
contract services in the smaller buildings.
Contract Maintenance
• Prepare and administer contracts for all building maintenance services, i.e., HVAC, plumbing, electrical,
construction projects, and custodial services.
B-139
PROGRAM:
FUND:
PROGRAM GROUP:
FACILITIES MAINTENANCE
GENERAL
GENERAL SERVICES
PAGE TWO
ACCTNO. 0015060
WORKLOAD STATISTICS:
Total Building Space Maintenance
800,628
Custodial Services
23%
Contract
FY02 FY03
SIGNIFICANT CHANGES:
Addition of 1,100 part time hours to assist with the increase in work orders.
77%
ln-House
B-140
PROGRAM:
FUND:
PROGRAM GROUP:
STREET TREE MAINTENANCE
MAINTENANCE ASSESSMENT
GENERAL SERVICES ACCTNO. 1605023
PERSONNEL
MAINTENANCE & OPERATIONS
CAPITAL OUTLAY
GRAND TOTAL
RttftlVE POSITIONS :, "•' , • -«
HOURLY/FTE POSITIONS
1999-2000
ACTUAL
280,604
236,834
2,218
2000-01
ACTUAL
285,276
256,752
5,625
519,6561 547,653
.- •' '',,,.5,50
1,25
5,90
2,00
2001-02
BUDGET
354,620
321,491
149
676,260
J: 5.90
1.75
2002-03
BUDGET
384,242
342,917
0
727,159
£ '• 5.90
f 1.75
WORK PROGRAM:
The Street Tree Division provides maintenance to all trees in the public right-of-way, and provides maintenance
services in Carlsbad's downtown Village, beach accesses, open space areas, and at City facilities.
PROGRAM ACTIVITIES:
Street Trees
• This division program provides maintenance for over 21,000 trees on City right-of-ways. The Maintenance
consists of pruning, planting, watering, removing, replacing, and root pruning. The division annually responds to
over 900 street tree work orders/requests, removes approximately 25 trees and plants over 400 trees annually
to help meet the Council's tree policy.
Contractual Tree Maintenance
• This program provides an on-going program for contracting, administering and overseeing the street tree
maintenance program beyond the scope of the division.
Weed Abatement
• This program involves the treatment of undeveloped right-of-way and open space areas for weed growth
removal. The activities include herbicide application and cultural practices to eliminate weed growth.
WORKLOAD STATISTICS:
1,285
1,146
Work Orders Trimmed Removed Planted
SIGNIFICANT CHANGES:
Implementation of the Community Forest Management Plan.
B-141
PROGRAM:
FUND:
PROGRAM GROUP:
MEDIAN MAINTENANCE
MAINTENANCE ASSESSMENT
GENERAL SERVICES ACCTNO. 1615024
PERSONNEL
MAINTENANCE & OPERATIONS
CAPITAL OUTLAY
GRAND TOTAL
FtflJUfiMEPOSTlQNS
HdJRLV/Ffl POSITIONS '". ,
1999-2000
ACTUAL
177,009
263,828
2,218
443,055
2.50
1.00
2000-01
ACTUAL
208,189
321,343
0
529,532
2,90
2.00
2001-02
BUDGET
202,125
333,360
149
535,634
2,90
1.50
2002-03
BUDGET
206,814
370,966
0
577,780
; v 2.50
1.50
WORK PROGRAM:
Provide weekly landscape maintenance and litter control to all City medians and to redevelop landscape
improvement areas.
PROGRAM ACTIVITIES:
Medians
• Maintain on a weekly basis, over 56 acres of landscaped medians. Maintenance includes trash pick-up, weed
control pruning, planting, pesticide application, removals, replanting, and irrigation repair/adjustment.
Contractual Median Maintenance
• Provide on-going program for contracting, administering and overseeing median maintenance for over 43 acres
of City medians.
Streetscape Maintenance
• Maintain approximately eight (8) acres of high-maintenance areas including planter boxes, downtown fountain,
pond, landscape pockets, and parking lots. Maintenance activities consist of litter control, weed control,
pruning, planting, pesticide/fertilizer application, irrigation repair/adjustment, parking lot sweeping, fountain
maintenance, and related duties with streetscape improvements.
WORKLOAD STATISTICS:
Acres Maintained
80%
Contract
20%
In-House
SIGNIFICANT CHANGES:
None.
B-142
PROGRAM:
FUND:
PROGRAM GROUP:
VEHICLE MAINTENANCE
INTERNAL SERVICE
GENERAL SERVICES ACCTNO. 6205060
PERSONNEL
MAINTENANCE & OPERATIONS
CAPITAL OUTLAY
GRAND TOTAL
FULLTIME POSITIONS : > Y . Y -'' -
HOURLY/FfE POSITIONS
1999-2000
ACTUAL
477,259
985,018
0
1,462,277
V; YYY7.QO
.. :: . 0.50
2000-01
ACTUAL
427,546
1,139,257
0
1,566,803
6.40
0.50
2001-02
BUDGET
494,860
1,255,245
36,000
1,786,105
7.90
0.00
2002-03
BUDGET
516,988
1,306,303
0
1,823,291
7.90
0,00
WORK PROGRAM:
Fleet Operations is an Internal Service fund within the City, which provides continuous repair and maintenance
service for City-owned vehicles and equipment operated by City departments. Fees developed on a cost recovery
system based on a per mile/hour charge by class of vehicle generate revenues to this department. This program
involves all facets of vehicle repair, maintenance and parts, ensures adequate supplies of fuel and oil are available
to operating departments, administers the collection and disposal of hazardous waste generated by City
departments, and oversees the collection of used oil and batteries from Carlsbad citizens and disposes of same in
accordance with County and State regulations. The fleet is comprised of 280 vehicles and 127 other pieces of
equipment.
PERFORMANCE MEASURES:
• Benchmark
Ninety percent (90%) of scheduled preventive maintenance work orders are completed within 48 hours from the
time the vehicle is delivered to the shop.
Result
Seventy-five point six percent (75.6%) of scheduled preventive maintenance work orders were completed within
48 hours from the time the vehicle was delivered to the shop.
• Benchmark
90% of internal surveys returned indicate the quality of service by fleet services/operations at "Good" to
"Excellent" in all service categories.
Result
One hundred percent (100%) of internal surveys returned indicate the quality of service by fleet
services/operations are "Good" to "Excellent" in all service categories.
PROGRAM ACTIVITIES:
Repair and Maintenance
• Provide routine preventative maintenance and repairs for the fleet; inspect vehicles required for the Biannual
Inspection of Terminals (BIT) and smog programs; sublet repairs to vendors as necessary; make road calls for
units disabled in the field.
Auto Parts
• Secure needed items for the maintenance and repair of the fleet through cooperative buying with other cities or
through State net discount; provide a perpetual inventory and automatically reorder quantities through the
automated management system.
B-143
PROGRAM:
FUND:
PROGRAM GROUP:
VEHICLE MAINTENANCE
INTERNAL SERVICE
GENERAL SERVICES
PAGE TWO
ACCTNO. 6205060
PROGRAM ACTIVIES (Continued)
Fuel and Oil
• Secure the necessary fuel and lubricating oil stocks through cooperative buying contracts with other agencies;
maintain sufficient stock on hand for emergencies; continue to supply fuels and lubricating oils to the Carlsbad
Unified School District, San Dieguito Union High School District, Cannon Pacific Services and Encina
Wastewater Authority; monitor fuel tanks in accordance with State and County regulations.
WORKLOAD STATISTICS:
NUMBER OF REPAIRS
Preventative Shop Repairs Vendor Emerg. Road
Maintenance Repairs Repairs
SIGNIFICANT CHANGES:
None.
B-144
PROGRAM:
FUND:
PROGRAM GROUP:
VEHICLE REPLACEMENT
INTERNAL SERVICE
GENERAL SERVICES ACCTNO. 6215061
PERSONNEL
MAINTENANCE & OPERATIONS
CAPITAL OUTLAY
GRAND TOTAL
FULLTIME POSITIONS,
HOURLY/FTE POSITIONS
1999-2000
ACTUAL
0
0
1,005,368
1,005,368
0.00
0.00
2000-01
|_ ACTUAL
0
0
1,079,331
2001-02
BUDGET
0
108,251
1,431,920
2002-03
BUDGET
0
60,000
1,607,000
1,079,331 1 1,540,171] 1,667,000
/ .. , 0.00
0.00
0.00
0.00
0.00
0.00
WORK PROGRAM:
This program sets a replacement charge for each piece of equipment in the City's motorized rental fleet with a value
of $5,000 or greater. This includes the determination of the economic life of individual units set forth in
Administrative Order No. 3, the development of proper specifications to suit user's needs, the outfitting of new units
before being placed into service and preparing replaced units for sale at auction or to interested public agencies or
special districts. The replacing of units enable the City to meet clean air requirements of the San Diego Basin and
ensures a more cost effective fleet.
PROGRAM ACTIVITIES:
Fund Maintenance
• Calculate future acquisition costs for units costing $5,000 or more in the rental fleet and establish an average
replacement charge by unit class.
Specification Writing
• Write specifications for the purchase of replacement units combining the needs of the users and economic
reality of the City.
Purchase and Disposal
• In partnership with the Purchasing Department, buy replacement units through the public bid process or in
cooperation with other public agencies through cooperative purchasing programs. Arrange for the public
auction of replaced units or sell them to other interested public agencies or special districts.
WORKLOAD STATISTICS:
500n
400
300-
200
100
0
402 407 410
39 44 57
Vehicle/Equipment Vehicle/Equipment
Acquired Disposed
Total Units
SIGNIFICANT CHANGES:
None.
B-145
PROGRAM:
FUND:
PROGRAM GROUP:
CARLSBAD GOLF COURSE
ENTERPRISE
GENERAL SERVICES ACCTNO. 5725001
PERSONNEL
MAINTENANCE & OPERATIONS
CAPITAL OUTLAY
GRAND TOTAL
FULLTIME POSITIONS ,
HOURLYFTE POSITIONS
1999-2000
ACTUAL
0
196,059
0
196,059
0,00
0.00
2000-01
ACTUAL
0
144,330
0
2001-02
BUDGET
0
349,750
0
2002-03
BUDGET
0
300,000
0
144,330| 349.75QL 300,000
0,00
0.00
. , 0,00
0.00
. 0.00
. 0.00
WORK PROGRAM:
Community Services and Park Development will assist the Project Oversight Committee in developing a municipal
golf course.
PROGRAM ACTIVITIES:
Continued Land Management Plan
• Maintain the proposed golf course property to
retain the viability of the project development.
PERFORMANCE OBJECTIVES:
• Land Management Program:
• Prevent further encroachment of existing
habitat.
• Remove unprotected and insignificant native
vegetation from project footprint.
Project Processing
• Continue environmental processing through
USF&W, CDF&G and the Coastal Commission.
SIGNIFICANT CHANGES:
None.
Preparation, review and analysis of proposed
golf course plan.
Retain environmental consultant and process
EIR.
Process approvals for the golf course.
Meet with Golf Course Steering Committee on an
as needed basis.
B-146
PROGRAM:
FUND:
PROGRAM GROUP:
MAINTENANCE & OPERATIONS
VARIOUS
MAINTENANCE & OPERATIONS SUMMARY
PERSONNEL
MAINTENANCE & OPERATIONS
CAPITAL OUTLAY
GRAND TOTAL
FULL TIME POSITIONS ,, . •-.-••
HOURLY/FTE POSITIONS
1999-2000
ACTUAL
4,225,016
20,268,119
188,930
2000-01
ACTUAL
4,086,735
21,733,760
65,485
2001-02
BUDGET
4,436,288
26,947,466
272,522
2002-03
BUDGET
4,648,340
26,569,997
261,667
24,682,065[ 25,885,980] 31,656,276j_ 31,480,004
7-f.OO
•2,00
70,30
0.50
, •/. 70.30
0.50
- , 66.90
1.00
PROGRAM GROUP DESCRIPTION:
This department is responsible for preventive maintenance, repair and operations of City and water district
infrastructure including City streets, water and sanitation systems, and management of the City's Solid Waste
Program.
PROGRAM ACTIVITIES:
Wastewater Operations
Recycled Water
Street Maintenance
Street Lighting
Traffic Signals
Solid Waste
WATER OPERATIONS
KEY ACHIEVEMENTS FOR 2001-02:
Utility Operations
• Received approval and permit amendment from the State Department of Health Services to perform a water
treatment pilot program using chlorine dioxide at Maerkle Reservoir.
• Worked cooperatively with the City's Finance Department to begin reading and billing water customers in cycles,
and achieved significant reductions between when consumption occurs and when a customer is notified of his
water use.
• Operated 17 sewer lift stations averaging 3.0 mgd of sewage pumped without a failure that resulted in a sewage
spill or contamination of the environment.
• Delivered over 20,000 acre feet of potable water, while meeting all the health standards established by the State
and Federal governments.
• Irrigated approximately 835 acres of landscape at 82 use sites with recycled water.
B-147
PROGRAM: MAINTENANCE & OPERATIONS
FUND: VARIOUS
PROGRAM GROUP: MAINTENANCE & OPERATIONS SUMMARY
KEY ACHIEVEMENTS FOR 2001 -02 (Continued):
Street/Construction/Maintenance
• Implemented the NPDES Municipal Facilities Component to prevent or reduce pollutants in runoff from all
municipal land use areas and activities.
• Eliminated a defective (private) lift station and converted it to a gravity system.
• Assisted in the development of the Area 5 park site.
Street Maintenance
• Implemented the NPDES Municipal Facilities Component to prevent or reduce pollutants in runoff from all
municipal land use areas and activities.
• Assisted in the development of the Area 5 park site.
Traffic Signal Maintenance
• Completed conversion to Video Detection Traffic Signal Control Activation at College Boulevard and Faraday
Avenue.
• Painted traffic heads at 6 intersections.
• Installed 10 battery backups at critical intersections.
• Completed conversion of traffic signal indicators from 8" to standard 12" LED.
• Completed conversion of old SDG&E service point to meet new standard service point meter service
connection.
Street Lighting
• Converted approximately 25 street lights to flat glass luminar.
Solid Waste Management
• Achieved a 59% solid waste diversion rate for reporting year 2000.
• Teamed with the City Manager's Office on negotiation of, and received approval from Council on, a new transfer
station and disposal services agreement as part of development of a long-term solid waste strategy.
KEY GOALS FOR 2002-03:
Top Quality Services
• Improve operational efficiencies in PW Maintenance & Operations by increasing efficiencies in productivity for
the work activity designated by each PW O&M Supervisor within their Efficiency Goal.
• Develop a STANDARDS OF CARE program for the field operations of the Public Works MSA and an evaluation
program to monitor and ultimately measure our performance.
Environmental Management
• Ensure effective and efficient collection, disposal and recycling of municipal solid waste generated in the City of
Carlsbad.
• Prevent or reduce pollutants in runoff from all municipal land use areas and activities by continuing implemented
BMP's and evaluating their effectiveness.
B-148
PROGRAM:
FUND:
PROGRAM GROUP:
STREET MAINTENANCE
GENERAL
MAINTENANCE & OPERATIONS ACCTNO. 0016355
PERSONNEL
MAINTENANCE & OPERATIONS
CAPITAL OUTLAY
GRAND TOTAL
FU1HME POSITIONS . , .
HOURLY/FTE POSITIONS
1999-2000
ACTUAL
1,000,374
971,454
39,844
2,011,672
21.25
. 0.00
2000-01
ACTUAL
1,026,962
1,007,042
7,513
2,041,517
2125
0.00
2001-02
BUDGET
1,186,803
1,517,942
6,232
2002-03
BUDGET
1,171,632
1,328,145
4,310
2,710,977) 2,504,087
21,25
0.00
19.50
0.00
WORK PROGRAM:
The Street Maintenance Division performs street and roadside maintenance to maximize the safety and circulation
efficiency of the roadway system.
PERFORMANCE MEASURES:
Roadway Safety:
• Benchmark
One hundred percent (100%) of roadway segments meet CalTrans collision rates.
Results
Ninety-five percent (95%) of Carlsbad's roadway segments meet CalTrans collision rates.
Roadway Circulation:
• Benchmark
Travel times on Palomar Airport Road and on El Camino Real as measured June 2000.
Results
Travel time decreased on Palomar Airport Road and increased on El Camino Real when measured December
2000.
Roadway Rideability:
• Benchmark
Average Pavement Condition Index (PCI) in the 70-85 range.
Measurement: Average PCI of 75 as measured in most recent survey, 1997-98.
PROGRAM ACTIVITIES:
Contract Management
• Contract Management consists of contract design, inspection, and support.
Roadside Maintenance
• Roadside Maintenance activities consist of weed abatement, litter pick-up, debris hauling, cement repair, and
guardrail maintenance.
Drainage System Maintenance
• The cleaning of brow ditches, catch basins, drainageways, and gutters.
City Sign Maintenance
• Fabricate, install and maintain all traffic, street name and special signs throughout the City.
B-149
PROGRAM:
FUND:
PROGRAM GROUP:
STREET MAINTENANCE
GENERAL
MAINTENANCE & OPERATIONS
PAGE TWO
ACCTNO. 0016355
PROGRAM ACTIVITIES (Continued)
Asphalt
• Consists of crack sealing, surface patching, trench repair, base replacement, and pothole patching.
Painting
• Consists of graffiti removal, line striping, crosswalks and stop bars, pavement messages, and curb and bull
nose painting.
WORKLOAD STATISTICS
PW STREET MAINTENANCE 2001 STAFF HOUR TOTALS
Painting
9.85%
Asphalt
11.30%
Misc Maintenance
16.06%
Contract Management
11.3%
Signs
2.57%Drainage
21.26%
Customer Services
8.4%
SIGNIFICANT CHANGES:
None.
B-150
PROGRAM:
FUND:
PROGRAM GROUP:
TRAFFIC SIGNAL MAINTENANCE
GENERAL
MAINTENANCE & OPERATIONS ACCTNO. 0016370
PERSONNEL
MAINTENANCE & OPERATIONS
CAPITAL OUTLAY
GRAND TOTAL
FULL TIME POSITIONS ,',
RQURLY/FTE POSITIONS > '
1999-2000
ACTUAL
28,751
381,767
14,975
2000-01
ACTUAL
55,006
688,558
0
425,493| 743,564
0.00
0.50
. . •.• 0.95
0.00
2001-02
BUDGET
57,420
531,359
109,853
L 698,632
0.95
0.00
2002-03
BUDGET
61,385
578,714
45,256
685,355
0.95
0.00
WORK PROGRAM:
Maintain the City's traffic signal system.
PROGRAM ACTIVITIES:
Customer Requests
• Respond to traffic signal repair requests.
Contract Administration
• Administer traffic signal maintenance agreement.
USA Markouts
• Mark underground utilities in coordination of the Dig Alert system.
Inspection/Construction Coordination
• Coordinate and inspect the installation and modification of traffic signals.
WORKLOAD STATISTICS:
PUBLIC WORKS TRAFFIC SIGNALS STAFF HOUR TOTALS
gj Inspection / Coordination
5.02%
I Miscellaneous
3.02%
O Customer Requests
40.11%QSpecial Projects
3.13%
H Contract Admin
13.13%
USA Markouts
35.59%
SIGNIFICANT CHANGES:
None.
B-151
PROGRAM:
FUND:
PROGRAM GROUP:
STREET LIGHTING
MAINTENANCE ASSESSMENT
MAINTENANCE & OPERATIONS ACCTNO. 1626357
PERSONNEL
MAINTENANCE & OPERATIONS
CAPITAL OUTLAY
GRAND TOTAL
FULL-TIME POSITIONS: ;
HOURkY/FTE POSITIONS
1999-2000
ACTUAL
231,484
528,823
581
760,888
4.00
1.00
2000-01
ACTUAL
202,609
641,128
0
843,737
. 2.85
0.00
2001-02
BUDGET
178,290
889,816
56,000
1,124,106
2.85
0.00
2002-03
BUDGET
186,630
952,811
0
1,139,441
2.40
0.00
WORK PROGRAM:
Maintain the City's street lighting system to maximize the safety and circulation efficiency of the roadway system.
PROGRAM ACTIVITIES:
Customer Requests
• Respond to street light repair requests.
Circuits
• Troubleshoot or repair of underground circuits and associated equipment.
USA Markouts
• Mark underground utilities in coordination with the dig alert system.
Surveillance and Repair
• Perform night surveillance to identify and schedule needed repairs.
System Upgrades
• Installation of technological advances.
WORKLOAD STATISTICS:
I Special Projects
4%
i lnspection\
Coordination
4%D Miscellaneous
4%
0 System Upgrades
3%
0 Circuits
4.72%
QSurveillance &
Repair
23.21%| USA Markouts
19%
0 Customer
Requests
38.07%
SIGNIFICANT CHANGES:
None.
B-152
PROGRAM:
FUND:
PROGRAM GROUP:
BUENA VISTA CHANNEL MAINTENANCE
MAINTENANCE ASSESSMENT
MAINTENANCE & OPERATIONS ACCTNO. 1636312
PERSONNEL
MAINTENANCE & OPERATIONS
CAPITAL OUTLAY
GRAND TOTAL
FUI&TME POSITIONS.;,., : ,.
HOURLY/FfE POSITIONS '
1999-2000
ACTUAL
0
8,924
0
2000-01
ACTUAL
0
7,176
0
2001-02
BUDGET
0
751,500
0
2002-03
BUDGET
0
1,590
0
8,924| 7,1 76| 751,500| 1,590
0.00
0:00
: , 0;QO0:00 0.00
0.00
, 0,00
0.00
WORK PROGRAM:
The Buena Vista Channel Maintenance Assessment District was created to ensure that adequate monies would be
collected to administer and maintain the Buena Vista Creek from Jefferson to Haymar Bridge. Property owners are
assessed annually and the revenues are placed in a fund to cover the costs of major dredging of the creek, which
could occur every four years. The last major clearing was completed in March of 1997.
PROGRAM ACTIVITIES:
• Administration of the Buena Vista Channel Maintenance District, monitoring revenues and calculating fees.
• Monitoring and periodic clearing of the overgrowth and silt within the channel.
WORKLOAD STATISTICS:
• Because the dredging of the channel only occurs every four years, there are no statistics available and no
performance measures have been identified for this program.
KEY GOALS FOR 2002-03:
Top Quality Services
• Evaluate alternative strategies following drainage studies in light of up-scaled environmental
clearances/mitigation measures to ensure desired drainage patterns.
SIGNIFICANT CHANGES:
No dredging of the channel planned for budget year.
B-153
PROGRAM:
FUND:
PROGRAM GROUP:
WATER OPERATIONS
WATER ENTERPRISE
MAINTENANCE & OPERATIONS ACCTNO. 5016310/5026310
PERSONNEL
MAINTENANCE & OPERATIONS
CAPITAL OUTLAY
GRAND TOTAL
FULL TIME POSITIONS j
HOURKY/FTE POSITIONS <
1999-2000
ACTUAL
2,238,360
14,727,211
78,326
2000-01
ACTUAL
2,160,295
15,300,675
53,676
2001-02
BUDGET
2,249,715
18,266,778
46,937
2002-03
BUDGET
2,390,299
18,823,128
205,801
17,043,897| 17,514,646| 20,563,430| 21,419,228
,32.00
'•••, 0.50
30.00
0150
: 30.00
0.50
. =32.60
: . 0.75
PROGRAM GROUP DESCRIPTION:
The Carlsbad Municipal Water District, a subsidiary district of the City of Carlsbad, provides potable water service to
approximately 85 percent of the City (66,300 customers). The District purchases 100% of its potable water as
treated water from the Metropolitan Water District and the San Diego County Water Authority.
PROGRAM ACTIVITIES:
Administration
• Provide support for Maintenance and Operations programs; coordinate budget development and fiscal activities;
maintain payroll records and time card administration; coordinate interdepartmental and interagency
communications.
Construction Maintenance
• Provide water and wastewater maintenance, scheduled and performed to provide a high level of maintenance
for infrastructure and maintained to insure safe and efficient distribution and collection systems.
Water Operations
• Provide operation and maintenance of the potable and recycled water reservoirs, pumping, regulating and
disinfection activities; collect water quality samples to ensure compliance with State and Federal regulations.
Cross Connection Control
• Implements and enforces cross connection control of potable and recycled water systems to ensure a safe
supply of potable water, and compliance with State and Federal regulations.
Meter Services
• Collect water customer usage data for utility billing to ensure financial viability of the District through timely and
accurate revenue collections; provide customer service for water utility customers and assist Construction and
Maintenance operations.
PERFORMANCE/WORKLOAD MEASURES:
Water Quality
• Ninety-eight percent (98%) of bacteria samples free of coliform bacteria as adopted by the City's Performance
Measurement Team. The State requirement is that less than 5 percent of all samples collected during any
month are total coliform-positive.
Fiscal
Year
1995-96
1996-97
1997-98
1998-99
1999-00
2000-01
Number
Collected
1,316
1,349
1,354
1,428
1,615
1,725
Total
Positive
4
6
1
3
1
3
Total
Bacteria-Free
1,312
1,343
1,353
1,425
1,614
1,722
Percent
Bacteria-Free
98.0%
98.1%
99.2%
99.0%
99.9%
99.8%
B-154
PROGRAM:
FUND:
PROGRAM GROUP:
WATER OPERATIONS
WATER ENTERPRISE
MAINTENANCE & OPERATIONS
PAGE TWO
ACCTNO. 5016310/5026310
PERFORMANCE/WORKLOAD MEASURES (Continued)
Water Reliability
• Annual number of hours per mile of distribution line that a water main is out of service will not exceed a total of
.05 hours in a year. This benchmark was established at baseline level and will be reviewed and revised, if
necessary, annually.
Fiscal
Year
1998-99
1999-00
2000-01
Total
Hours
18
17
0
Miles
Distribution Lines
350
400
410
Hours/Mile
Distribution Line
.05
.04
0.00
Water Delivery Efficiency
• Annual water loss not to exceed six percent as set by SMWD (City) Standard Bulletin 166-4, Urban Water Use
in California, August 1994. Distribution system losses commonly range between 6 and 15%. AWWA
recommends that the loss after treatment be maintained at 10% or less.
Fiscal
Year
1996-97
1997-98
1998-99
1999-00
2000-01
Water
Loss
2.08%
2.66%
4.87%
5.36%
4.29%
Cost of Service
Fiscal
Year
1999-00
2000-01
Delivered
(AC.-FT.)
20,069
21,135
Cost of
Service
$18,393,999
$19,375,900
Cost for
AC.-FT.
Delivered
$916.54
$916.77
WORKLOAD STATISTICS:
Water Use Data
Collection
29%
Daily
Water Service Turn- Operations/System
Off/On Maintenance Flow Control Station
9% 151% Maintenance
3%
Valve Maintenance
21%
Fire Hydrant \ Fire Hydrant
Maintenance Replacement/Repair
18% 5%
SIGNIFICANT CHANGES:
Several positions were allocated to water from sewer to accurately reflect the work performed for each program.
B-155
PROGRAM:
FUND:
PROGRAM GROUP:
WASTEWATER OPERATIONS
WASTEWATER ENTERPRISE
MAINTENANCE & OPERATIONS ACCTNO. 5116310
PERSONNEL
MAINTENANCE & OPERATIONS
CAPITAL OUTLAY
GRAND TOTAL
FQL1-TIME POSITIONS; •.-••/
HOURLY/FTBPOSiTIQNS
1999-2000
ACTUAL
664,730
3,562,581
55,204
2000-01
ACTUAL
588,775
3,881,613
4,296
4,282,5151 4,474,684
13.00
0,00
15.00
0.00
2001-02
BUDGET
694,540
4,765,143
53,500
5,513,183
= 15.00
0.00
2002-03
BUDGET
764,731
4,735,862
6,300
5,506,893
11.20
0.25
PROGRAM GROUP DESCRIPTION:
The City of Carlsbad, operates and maintains a sanitary sewer collection system, which covers approximately 65%
of the geographic area of the City. Sewage is treated by the Encina Wastewater Treatment Plant, a facility jointly
owned by the Cities of Carlsbad and Vista, the Leucadia County Water District, the Vallecitos Water District, the
Buena Vista Sanitation District, and the Encinitas Sanitary District..
PERFORMANCE MEASURES:
Sewer System Reliability
Total Gallons Spilled
Total Feet of Mains
Total Gallons per Foot
Sewer Cost Efficiency
Fiscal Year Expenses
Flow- mgd
Annual Flow
$/mg
WORKLOAD STATISTICS:
Benchmark
895,651
765,600
1.17
1999-00
895,651
765,600
1.17
2000-01
2,116,992
765,600
2.77
1997-98
$2,364,962.00
5.10
1,861.50
$1,270.00
1998-99
$2,244,652.00
5.98
2,182.70
$1,028.00
1999-00
$2,233,201.00
6.34
2,314.10
$965.00
2000-01
$2,308,593.00
6.50
2,372.50
$973.06
Sewer Lateral Main
Maintenance
2.7% FTE
Sewer Lateral Main
Stoppage
4.9% FTE
Sewer Lateral Main
Research
3.9% FTE
SIGNIFICANT CHANGES:
None.
B-156
PROGRAM:
FUND:
PROGRAM GROUP:
SOLID WASTE MANAGEMENT
SOLID WASTE ENTERPRISE
MAINTENANCE AND OPERATIONS ACCTNO. 5206375
PERSONNEL
MAINTENANCE & OPERATIONS
CAPITAL OUTLAY
GRAND TOTAL
FULL TIME P$S1T1ON$
HQURLY/FfE TOSITtONS
1999-2000
ACTUAL
61,317
87,359
0
148,676
••-, OJ5
0.00
2000-01
ACTUAL
53,088
207,568
0
2001-02
BUDGET
69,520
224,928
0
260,656] 294,448
025
0.00
:0.25
0,00
2002-03
BUDGET
73,663
149,747
0
223,410
0.25
0.00
WORK PROGRAM:
The Solid Waste Division of the Public Works Department promotes cost-effective solid waste management
programs through recycling, source reduction, composting, solid waste transfer, and other non-traditional programs.
PERFORMANCE MEASURES:
Customer Satisfaction
• Eighty-one point five percent (81.5%) rate solid waste services as "Good" or "Excellent".
Cost Efficiency
• Residential rates (adjusted for City fees) are third lowest in the County.
Diversion
• Year 2000 Diversion rate as reported to the California Integrated Waste Management Board: fifty-eight percent
(58%).
PROGRAM ACTIVITIES:
AB939
• Implement components of Source Reduction and Recycling Element (SRRE) and Household Hazardous Waste
Element (HHWE). Coordinate activities with Countywide Technical Advisory Committee. As required, prepare
and submit reports and documents.
Solid Waste
• Ensure collection and disposal of solid waste generated in Carlsbad; coordinate activities with regional groups;
administer and monitor the solid waste services contract; and review reports and rate requests from authorized
collector.
Recycling/Diversion
• Prepare and administer recycling contract. Prepare State and County grant applications. Attend regional
recycling meetings and coordinate City efforts with other agencies. Coordinate and monitor all recycling
programs.
SIGNIFICANT CHANGES:
Additional funds have been budgeted to perform a rate study in fiscal year 2002-2003.
B-157
B-158
IWP^r ",!,?>&'••' ; i -n" -: : ' V* !•.!•!":•;- ••-<>- l L
. *.-• . ... . ....•>•••'$ ' ",:^'&;-!.£i;i
" - '- ''. ";-,*<f't Lr^W^::'si, '""!
,- ;. ..'.'- :^.^.---^X:;:'^>-'^«4^,
.
- ' '.- "' '•'•'.^•W"!??;...)., .::»;/.>..,.'.,•....>•• ••;;.'ir":.,:.:;,--'y'H^sSO.,_ , / ,--, •.- . ,-;;»(;;^|P!.:,f:i'.!fer')fe."?.V ';>-;;-Ss8{*r.Airj:«4i»^:'^ISiij**^S^i»!
.:'-:'i:': j:>' i>.<;;i'P'# :,'>«'->~:i:%;.)J'f i'i'-1 c?** >'??••'•'• '" ' '-.• '''^::^:5/t''?^/'S^A'STif::i6iiS^^fej(«'fl'if!
•=•-"f;,*«/;-^!y%~7<>a=fe.Sli^ia.yi;:«7«iM&MXa^^^s..«S:*"«*lSi,if,,S, -i!»
-r-fr IL-A.4
2002-2003 CAPITAL IMPROVEMENT PROGRAM
OVERVIEW
The City of Carlsbad Preliminary Capital Improvement Program (CIP) is a planning document,
which outlines the expenditure plan for future capital projects and the corresponding revenues to
pay for those expenditures. The CIP is a financial planning document, not a commitment for
spending. Spending authorization is given only at the time the City Council formally adopts the
proposed budget, and, at that time, funds are only appropriated for the following fiscal year.
The information shown in subsequent years is being provided to provide the most
comprehensive snapshot of all the known future facilities the City of Carlsbad plans to construct.
What is the definition of a CIP project? Projects that are
shown in the CIP are generally defined as any construction (or
reconstruction) of major infrastructure or buildings that are
located on or in the ground. In most cases, the total construction
cost of each CIP project is added to the City's inventory of major
infrastructure and buildings.
The 2002-2003 Preliminary Capital Improvement Program outlines $38 million in new
appropriations and projected revenues during the fiscal year are estimated at $32.9 million. As
the City continues to grow and develop, there is a corresponding increase in the demand for
development-related services and new facilities. To ensure that the necessary infrastructure and
facilities are built on a schedule that meets or exceeds this demand, the citizens of Carlsbad
adopted a Growth Management Plan in 1986. The Growth Management Plan states that unless
a standard level of facilities is available to meet new demands resulting from the City's growth,
development cannot proceed. This Plan is the foundation for making decisions about the timing
and prioritization of the capital projects under consideration. A discussion of the City's Growth
Management Plan is located at the end of this report. This year's CIP reflects the Council's
continued commitment to constructing the necessary facilities, in response to the current and
anticipated development activity occurring throughout the City.
In addition to prioritizing projects based on growth management, projects are continuously
evaluated and prioritized to ensure the City's resources for facilities are allocated based on a
well thought-out plan.
Projects in this CIP document were prioritized based on the following criteria:
Project Ranking Criteria
1. Is the project needed now for health and safety of the
citizens, or to comply with growth management or legal
mandates?
2. Is the project needed soon for growth management
compliance?
3. Is the project needed now for other City standards
(example: ball field standards)?
4. Is the project needed soon for other City standards?
5. Does the project complete or provide part of the basic
infrastructure (example: a linking road segment)?
Are there other reasons to construct the project (example:
timing or funding opportunity)?
C-1
2002-2003 CAPITAL IMPROVEMENT PROGRAM
FUTURE GROWTH AND DEVELOPMENT
In order to estimate future revenues from development, several assumptions about the rate and
type of growth need to be made. These assumptions can change from year to year and
correlate with the economic climate.
Every year, City staff evaluates all existing and future development projects and compares these
projects to the buildout capacity of the City using adopted general plans. Information about
existing building activity combined with estimates of how remaining net developable land might
develop are then summarized to prepare future projections about when and where growth will
occur. Finance Department staff then prepares estimates of
future development fee revenues paid by those developments,
and compares these revenue estimates to the expenditure plan
to ensure that funding will be sufficient and available for
construction of the planned capital projects as shown in the CIP.
In addition to evaluating whether or not capital funds are
sufficient, several projects have significant operating cost
impacts that are also analyzed at that time. Where funding
discrepancies occur, project timing is again evaluated and
recommendations are made to resolve the discrepancies.
Residential development is expected to slow down in the coming years, as compared to the
previous 5-year period. This slow down is not necessarily based on economic conditions, but
rather on the development schedules of the remaining vacant parcels. Residential development
for 2001-2002 was projected at 587 building permits; however, recent estimates anticipate about
733 units will be permitted by the end of the current fiscal year. Construction is expected to
decrease to about 930 units per year for the next five years, as compared to an average of over
1600 units per year for the previous 5-year period.
Residential Units Trend 1986 to 2007
300<h GROWTH MANAGEMENT IMPLEMENTED
I
ACTUAL ESTIMATED
Non-residential development is also showing signs of slowing down. The average annual
building permits for the past 5 years was about 1,500,000 square feet of non-residential
development. This year, the estimate is for just over 800,000 square feet, and estimates for the
next 5 years are approximately 900,000 square feet per year. Projects include several
commercial/retail developments located in or near the areas where most of the residential
development has occurred or is planned over the next several years. A variety of projects are
C-2
2002-2003 CAPITAL IMPROVEMENT PROGRAM
planned in the next 5 years, including restaurants, hotels, shopping centers, golf company
expansions, and various other industrial and commercial development projects. The following
table shows the number of residential units and non-residential square feet of development used
in calculating estimated revenues for 2002-2003 and subsequent years to buildout.
Projected Development
Residential and Non-Residential Construction
Residential Non-Residential
Year
2001-2002 current
2002-2003
2003-2004
2004-2005
2005-2006
2006-2007
Years 6-10
Years 11 -buildout
Total Future
Units Square Feet
733
648
1,112
1,001
964
925
2,505
2,718
9,873
817,829
663,794
912,633
962,393
974,510
1,034,120
6,258,156
3,030,842
13,836,448
REVENUES
Revenues for Capital Projects from now until buildout total $427 million and may be segregated
into five major categories: 1) fees generated by development in Carlsbad, 2) special district fees
and taxes (Community Facilities Districts and Bridge and Thoroughfare Benefit Districts), 3)
Water and Sewer replacement reserves, 4) Infrastructure Maintenance and Replacement
transfers from the General Fund, and 5) other sources including grants, bond issues, and
contributions from other agencies.
Funding Sources 2002-2003 to Buildout
Total Revenue = $427 million
Development Special Water/Sewer Infrastructure Other
Fees Districts Replacement Maintenance Agencies
Approximately 38% of all capital revenue is received as a result of development, and is
dependent upon assumptions made about the City's annual growth in dwelling units and
commercial/industrial square feet. Development revenues include Public Facilities Fees (PFF),
C-3
2002-2003 CAPITAL IMPROVEMENT PROGRAM
Traffic Impact Fees (TIP), Park-ln-Lieu Fees (PIL), Planned Local Drainage (PLD) Fees, Water
Connection Fees (MFF), and Sewer Connection charges. Revenue from special districts, such
as Community Facilities Districts and Bridge and Thoroughfare Benefit Districts comprise 12% of
the total. Water and Sewer replacement revenues generated by user fees equal approximately
6% of total revenues, and are used to pay for replacement of existing water and sewer facilities.
Infrastructure Maintenance revenues are transfers from the Cities General Fund which are being
set aside to pay for replacement and major maintenance of capital facilities other than sewer
and water facilities, and equal 22% of future estimated revenues. The remaining 22% consist of
revenues from other agencies including Federal & State grants, the County sales tax program
(TransNet), contributions from other Cities and Counties, and pending financing districts.
Calculation of Future Fees
The revenue projections of the Capital Improvement Program reflect the growth assumptions
identified in the previous section. The following information delineates how those assumptions
were applied to estimate future development revenues. The mix of multi-family and single-family
residential units is assumed to be 35% and 65% respectively and reflects the anticipated mix of
residential development for each Local Facilities Management Zone. The building permit
valuation used for computing Public Facilities Fees is $154,000 per multi-family dwelling unit,
and $240,800 per single-family dwelling unit. A building permit valuation of $38 per square foot
of construction is used to calculate non-residential Public Facilities Fees.
In order to calculate estimated revenues for Traffic Impact Fees (TIF), the
number of average daily trips was computed for each type of
development use. A multi-family residential dwelling unit is assigned
eight trips per day and a single-family unit is assigned ten trips per day.
Each residential trip is valued at the current TIF of $94. The trips-per-day
value for commercial and industrial buildings are averaged at 32 trips per
1,000 square feet of development, although the actual volume of trips
generated by commercial/industrial building can vary widely depending on
the ultimate land use. The value assigned to each commercial/industrial trip is $38.
The implementation of CFD No. 1 in 1991 reduced the total amount of projected PFF and TIF
revenues, since some projects previously funded from these sources are now funded through
this CFD. CFD No. 2 is proposed to fund Rancho Santa Fe Road and Olivenhain Road, but has
not yet been formally established. A prepayment program is in place to enable development to
proceed within this proposed district.
Park-in-Lieu Fees are collected for the purchase and development of parkland within each
quadrant of the City. The fees are based on the acquisition cost of parkland, and were
increased in June 2001 to reflect the escalating cost of land
throughout the City. Projects in the CIP funded with Park-in-Lieu
Fees include Pine School Park site development in the NW
Quadrant, Larwin Community Park and future park development in
the NE Quadrant, parkland restoration and acquisition in the SW
Quadrant, and Alga Norte parkland acquisition in the SE Quadrant.
There are two existing Bridge and Thoroughfare Fee Districts (BTD), which were formed by
property owners to finance specific road construction projects located within each of the district
boundaries. Poinsettia Lane - Aviara Parkway (BTD No. 2) was formed to finance the
construction of Poinsettia Lane between Aviara Parkway and El Camino Real and Aviara
Parkway between Palomar Airport Road and Poinsettia Lane. BTD No. 3 (Cannon Road West)
was formed to fund portions of Cannon Road from Interstate 5 to El Camino Real.
C-4
2002-2003 CAPITAL IMPROVEMENT PROGRAM
Two additional financing districts may be formed in the upcoming years to fund College
Boulevard and Cannon Road extensions east of El Camino Real, and Melrose Drive and
Faraday Avenue extensions. City staff is currently working with property owners with pending
developments in those areas to assist in the formation of those financing districts.
CAPITAL PROJECTS
The following two sections provide summary expense and revenue data, as well as a description
of the major capital projects. The first section contains information through buildout, and the
second section focuses on the next five years.
CAPITAL PROJECTS 2002-2003 TO BUILDOUT
The CIP for 2002-2003 to buildout outlines approximately 177 future projects at $353.3 million.
CIP Project Statistics
Type of Project
Streets/Circulation
Parks
Sewer
Water
Facilities/Civic
Drainage
Other (loans)
Total Future
Quantity
81
16
29
31
13
7
N/A
177
Total Cost
$115,380,662
63,804,200
74,200,402
25,960,937
37,562,700
17,749,000
18,675,548
$353,333,449
Expenditures by Category
2002/2003 to buildout
Total = $353 million
Civic Drainage Parks Sewer Water Streets Loans
C-5
2002-2003 CAPITAL IMPROVEMENT PROGRAM
The largest expenditure category is for street and traffic signal construction projects, which total
$115.4 million or 32.7% of all future projects. Included in this category is construction of several
major roadways, which will add east-west connections and improve the flow of regional traffic as
well as local traffic throughout the City. Several of these roads will provide additional routes to
the neighboring cities of Oceanside, Vista and San Marcos.
Major street projects in the 2002-2003 to Buildout CIP:
• Faraday Avenue and Melrose Drive Extensions east of El Camino Real
• Poinsettia Lane to El Camino Real
• Poinsettia Lane east of El Camino Real
« Cannon Road to El Camino Real
• Cannon Road and College Boulevard East of El Camino Real
• Rancho Santa Fe Road to San Marcos and Encinitas
Proposed Major Road Projects
LEGEND:
RAILROAD
NEW ROAD PROJECTS
C-6
2002-2003 CAPITAL IMPROVEMENT PROGRAM
Sewer projects are the second largest expenditure category and total almost $74.2 million.
Projects include the construction of the South Agua Hedionda interceptor, the Vista/Carlsbad
trunk line interceptor, cleaning and refurbishment of existing sewer lines and access holes, the
repayment of bonds for the expansion of the Encina Wastewater Facility, and the Encina parallel
ocean outfall and cogeneration projects. The largest of these projects is the Vista/Carlsbad
interceptor currently under construction. There are several phases to this project which will span
over several years. Construction will occur along Jefferson Street from Interstate 5 to Oak
Avenue and along Oak Avenue from Jefferson Street to the west side of the railroad right-of-
way.
The third largest expenditure category is for park projects, which total $63.8 million, or 18.1%.
Park projects include acquisition and/or development of acreage within all quadrants of
Carlsbad. Future park projects include:
Northwest Quadrant Northeast Quadrant
Larwin ParkNW Quadrant Park (Pine School)
Community Facility (Pine School)
Cannon Lake Park
Hosp Grove-Buena Vista Lagoon Recreational Improvements
Southwest Quadrant
Poinsettia Park Phase II
Aviara Community Park
Southeast Quadrant
Alga Norte Park
Swimming Pool at Alga Norte Park
Leo Carrillo Park Phase III
In addition, Veteran's Memorial Park, a 100-acre site, which is centrally located in the City of
Carlsbad, and a business park recreational facility located in the industrial area is planned.
Environmental permits are continuing to be processed for the City's 250-acre golf course located
in the industrial corridor directly south of the future Veterans Memorial Park. Development is
currently on hold pending coastal commission review.
Water projects total about $26 million (7.3%). The primary projects
included in this category are reservoir construction and improvements,
and construction of recycled and potable pipelines. Some of the major
areas in which these installations or upgrades are planned include
segments of College Boulevard, Poinsettia Lane, El Fuerte, and along El
Camino Real.
Construction of City facilities such as libraries, administrative
facilities, and police and fire facilities total $37.6 million, or
10.6% of the total planned capital expenditures to buildout.
The Capital Improvement Program includes funds to
reconstruct and expand this facility in future years. A new City
Hall is planned for construction in the future; the timing and
location have not been determined.
Specific timing and cost estimates for all capital projects are identified in the Detail Schedule of
Capital Projects (2002-2003 to Buildout) following this narrative.
C-7
2002-2003 CAPITAL IMPROVEMENT PROGRAM
CAPITAL PROJECTS - THE NEXT FIVE YEARS
Some of the major projects planned for the next five years are discussed below; their locations
can be seen on the map in the previous section.
• Streets - Several large street construction projects are planned for the next 5 years. The
extensions of Cannon Road and Poinsettia Lane to El Camino Real are located west
of El Camino Real and are being constructed primarily as a result of residential
developments in those areas. College Boulevard and Cannon Road extensions to the
east and north, as well as Faraday Avenue and Melrose Drive extensions, are located
east of El Camino Real and will alleviate traffic on Palomar Airport Road. The widening
and realignment of Rancho Santa Fe will improve regional and local traffic flow
generated in the southern part of the City.
• Aviara Community Park - Construction is scheduled to begin next fiscal
year on this 24-acre site located in the southwest quadrant north of
Poinsettia Lane and west of El Camino Real. The park is planned to
include ball fields, soccer fields, basketball courts, tot lots, and open play
and picnic areas. A community center will also be constructed at this
location.
• Larwin Park - Larwin Park is located on a 22-acre site in the northeast
quadrant of the City. Plans for development of this park include
constructing trails, a tot lot, and other amenities.
• Alga Norte Park - This park site consists of 30 acres in the Southeast
Quadrant and may include amenities such as ball fields, soccer fields,
tennis courts, picnic areas, tot lots, restrooms and parking facilities.
Design of the park will begin next fiscal year, with construction in the
years to follow.
• Poinsettia Park Phase II - Within the next five years, development of the final phase of
Poinsettia Park is scheduled. Plans include a community center/gymnasium, an
enclosed soccer field, tot lots, picnic areas, a tennis complex, and additional parking.
• Pine School Park - Prior to development of this 7-acre site, an extensive community
outreach program with local residents and various organizations will be implemented to
gather public input for the ultimate design. Design and construction are planned in the
next two years.
• Fire Station No. 3 and No. 6 Relocation - Fire Station No. 6 is currently located in a
temporary facility in the southeast quadrant of Carlsbad. Relocation of this station to a
permanent facility along the east side of Rancho Santa Fe Road is scheduled to occur
concurrent with the road alignment project. This fire station is required to ensure a five-
minute response time within the southeast part of the City as development in that area
occurs. Fire Station No. 3 located in the northeast quadrant of the City, will be relocated
east towards Calavera Hills to better serve the growth in that area.
• Drainage Facilities - Funding for the construction of drainage facilities along College
Blvd. and Cannon Road are scheduled next fiscal year.
• Vista/Carlsbad Interceptor- The Vista/Carlsbad Interceptor project involves installation of
a new and upgraded sewer trunk line through the downtown portion of Carlsbad to the
C-8
2002-2003 CAPITAL IMPROVEMENT PROGRAM
Encina Water Pollution Control Facility. There are three phases left to complete this
project: the Agua Hedionda Lift Station, an interceptor in the Agua Hedionda bridge
structure, and interceptor from the Agua Hedionda Lagoon to the Encina Water Pollution
Control Facility. This project is required to handle buildout flows and replace deteriorated
pipeline, and is partially funded by the City of Vista. Construction is currently underway
and will continue for several more years.
• Waterlines - Several major water lines are scheduled for
construction within the next five years:
- Aviara Parkway from Poinsettia Lane to Palomar Airport Road
- College Boulevard from Cannon Road to Carlsbad Village Drive
- El Camino Real from Cassia to Poinsettia Lane
El Fuerte from Poinsettia Lane to Palomar Airport Road
College Boulevard from Maerkle Reservoir to Agua Hedionda
Creek
• Recycled Water Program - The city plans to construct a recycled water facility to
increase the supply of water and reduce dependence on external suppliers. Funding has
already been authorized for this project, which will span over several years.
SUMMARY
The proposed 2002-2003 to Buildout CIP is being driven by the City's commitment to insure that
facilities are available to service the developing areas as well as the current residents.
Carlsbad's philosophy has been to build quality capital facilities, which meet, and at times
exceed Growth Management standards. Phasing projects over a period of years to match
funding availability and maximizing the use of available resources are methods used in order to
meet the needs of Growth Management. The 2002-2003 to Buildout Capital Improvement
Program reflects the commitment of Carlsbad's Council and staff to continue providing its
residents with a better quality of life.
C-9
2002-2003 CAPITAL IMPROVEMENT PROGRAM
GROWTH MANAGEMENT PLAN
The Growth Management Plan was developed and voted into law by the citizens of Carlsbad in
1986. The plan was established in an effort to manage development within the City by linking
residential, commercial, and industrial development directly to standards for availability of public
services and facilities.
The Growth Management Plan adopted has established precise standards for eleven public
facilities. Standards must be met at all times as growth occurs. Facilities for which standards
have been established are as follows:
- City Administrative - Library
- Wastewater Treatment - Parks
- Circulation - Drainage
- Fire - Open Space
- Schools - Sewer Collection
- Water Distribution
The Plan requires that appropriate public facilities be available, in conformance with the adopted
performance standards, as development occurs. Unless each of the eleven public facility
standards have been met, no new development can occur.
The Growth Management Plan impacts both the Operating Budget and the Capital Improvement
Program. The detailed level of planning required by Growth Management has allowed
Carlsbad's Capital Improvement Program to anticipate the funding needed for capital
improvements through buildout of the City. The timing of construction of facilities is governed by
the rate of development and the 11 performance standards. New public facilities often require
additional staffing and other resources, which affects the Operating Budget. Facilities such as
community centers, parks, and fire stations have been constructed and opened to the public
under this program.
The Capital Improvement Program has been designed to specifically address areas where new
or expanded facilities will be needed to maintain compliance with the adopted performance
standards. With the adoption of the 2002-2003 CIP, compliance with the Growth Management
Plan is assured.
C-10
2002-2003 CAPITAL IMPROVEMENT PROGRAM
CALIFORNIA ASSEMBLY BILL 1600 (AB 1600)
In 1987, the California Legislature passed Assembly Bill 1600 (AB 1600) which set forth the
process a city or county must follow to establish developer fees to finance public facilities. This
legislation applies to fees established, increased, or imposed on or after January 1, 1989, the
effective date of the law. AB 1600 contains four general requirements:
1. A "nexus" or connection must be established between a development project or class of
project and the public improvement being financed with the fee. All AB 1600 fees adopted
by the City have met the nexus test. For example, Traffic Impact, Bridge and Thoroughfare
District and Drainage Sewer Benefit Area Fees were all established under AB 1600.
2. The fee must be segregated from the General fund. Carlsbad segregates all capital funds
not only from the General fund, but also each classification of fee as well.
3. Fees collected by a city or county must be spent or committed to a project within a five-year
period. Funds are viewed to be committed if they are programmed to be spent on a specific
project(s). If the money is not spent, findings must be made describing the continuing need
for that money each fiscal year after the five years has expired. The City of Carlsbad
commits the revenues from these fees through its Capital Improvement Program budget.
This budget, which is adopted by the City Council, sets forth the City's Capital expenditure
program from the current year to projected build out of the City. The expenditure plan is
updated annually as part of the City's budget process.
4. Refunds must be made only if the City cannot make the required findings. At this time, no
refunds are due because the City's Capital Improvement Program commits all AB 1600 fees
to projects to be constructed both in the current year and in the future.
C-11
CITY OF CARLSBAD
CAPITAL FUNDS
PROJECTED FUND BALANCES FOR FY 2001-2002
FUND
ASSESSMENT DISTRICTS
BTD#2 - POINSETTIA LANE/AVIARA PKWY
BTD#3 - CANNON ROAD WEST
CFD#1 -CITYWIDE
CFD #2 - RANCHO SANTA FE ROAD
GAS TAX
GENERAL CAPITAL CONST.
GOLF COURSE
GRANTS -COUNTY
GRANTS -FEDERAL
GRANTS - STATE
INFRASTRUCTURE MAI NT & REPL
OTHER
PARK FEE ZONES 5,13,16
PARK-IN-LIEU NE
PARK-IN-LIEU NW
PARK-IN-LIEU SE
PARK-IN-LIEU SW
PLANNED LOCAL DRAIN'G
PUBLIC FACILITIES FEE
REDEVELOPMENT BONDS
SEWER BENEFIT AREAS
SEWER CONNECTION
SEWER REPLACEMENT
TDA
TRAFFIC IMPACT FEE
TRANSNET/BIKE
TRANSNET/HIGHWAY
TRANSNET/LOCAL
TRANSNET/STP
WATER - MAJOR FACILITY
WATER - RECYCLED WATER
WATER - REPLACEMENT
TOTAL
JULY 1,2001
UNRESERVED
BALANCE
596,858
2,582,427
3,243,453
41,947,966
17,525,663
6,995,282
8,863,347
346,734
1,187,465
11,059
1,926,602
5,406,673
886,007
575,836
1,262,116
315,391
5,406,109
818,040
7,108,290
30,751,803
922,226
5,062,698
30,043,610
15,953,333
188,304
5,367,590
0
900,902
9,263,257
1,449,577
10,811,420
3,835,005
22,728,736
244,283,779
ESTIMATED
REVENUES
16,668
579,115
103,266
5,918,573
1,065,538
1,796,655
3,892,720
0
38,389
815,148
791,622
3,354,978
515,974
160,590
436,254
369,488
173,671
290,775
1,774,079
5,102,603
20,226
371,173
8,798,731
2,365,171
27,422
1,174,330
200,000
28,861
251,548
44,127
2,755,738
34,320,300
2,961,560
80,515,293
ESTIMATED
CAPITAL
EXPENDITURES
123,280
949,761
1,833,041
17,869,178
1,634,098
5,556,478
2,399,299
129,864
0
683,718
2,426,173
1,033,915
660,611
3,644
16,871
402,372
177,606
129,447
947,100
7,504,950
57,989
389,809
9,072,874
2,915,378
145,408
236,288
172,550
230,239
7,232,324
852,139
1,624,338
1,691,221
2,128,248
71,230,211
ESTIMATED
DEBT SERVICE
LOANS & OTHER
0
1,471,944
0
0
0
(1,471,944)
0
0
(300,000)
0
0
0
0
0
(192,150)
(19,427)
(568,367)
661,522
0
0
0
0
(942,161)
0
0
0
0
0
300,000
0
(2,024,808)
(131,024)
804,798
(2,411,617)
JUNE 30. 2002
PROJECTED
BALANCE
490,246
3,683,725
1,513,678
29,997,361
16,957,103
1,763,515
10,356,768
216,870
925,854
142,489
292,051
7,727,736
741,370
732,782
1,489,349
263,080
4,833,807
1,640,890
7,935,269
28,349,456
884,463
5,044,062
28,827,306
15,403,126
70,318
6,305,632
27,450
699,524
2,582,481
641,565
9,918,012
36,333,060
24,366,846
251,157,244
C-12
CITY OF CARLSBAD
CAPITAL FUNDS
PROJECTED FUND BALANCES FOR FY 2002-2003
FUND
ASSESSMENT DISTRICTS
BTD#2 - POINSETTIA LANE/AVIARA PKWY
BTD#3 - CANNON ROAD WEST
CFD#1 -CITYWIDE
CFD #2 - RANCHO SANTA FE ROAD
GAS TAX
GENERAL CAPITAL CONST.
GOLF COURSE
GRANTS - COUNTY
GRANTS - FEDERAL
GRANTS - STATE
INFRASTRUCTURE MAINT & REPL
OTHER
PARK FEE ZONES 5,13,16
PARK-IN-LIEU NE
PARK-IN-LIEU NW
PARK-IN-LIEU SE
PARK-IN-LIEU SW
PLANNED LOCAL DRAIN'G
PUBLIC FACILITIES FEE
REDEVELOPMENT BONDS
SEWER BENEFIT AREAS
SEWER CONNECTION
SEWER REPLACEMENT
TDA
TRAFFIC IMPACT FEE
TRANSNET/BIKE
TRANSNET/HIGHWAY
TRANSNET/LOCAL
TRANSNET/STP
WATER - MAJOR FACILITY
WATER - RECYCLED WATER
WATER - REPLACEMENT
TOTAL
JULY 1,2002
PROJECTED
BALANCE
490,246
3,683,725
1,513,678
29,997,361
16,957,103
1,763,515
10,356,768
216,870
925,854
142,489
292,051
7,727,736
741,370
732,782
1,489,349
263,080
4,833,807
1,640,890
7,935,269
28,349,456
884,463
5,044,062
28,827,306
15,403,126
70,318
6,305,632
27,450
699,524
2,582,481
641,565
9,918,012
36,333,060
24,366,846
251,157,244
ESTIMATED
REVENUES
0
1,620,700
135,252
3,870,758
0
2,469,687
0
0
0
0
0
3,600,000
1,151,000
141,794
342,211
32,619
86,664
8,889
603,266
3,397,914
0
400,000
1,977,500
1,400,000
70,000
929,395
0
1,211,000
4,600,000
0
817,740
160,000
3,841,860
32,868,249
2001-2002
CONTINUING
APPROPR.
335,010
468,584
130,535
14,871,611
16,137,578
1,308,410
4,731,143
216,870
0
126,149
50,167
1,184,585
11,349
13,000
533,128
0
4,622,393
219,100
2,679,281
18,463,451
580,335
2,660,211
6,269,269
7,615,973
68,849
2,082,593
27,450
364,212
813,268
319,814
4,762,008
33,431,004
12,116,382
137,213,712
NEW
APPROPR.
153,000
0
0
110,000
0
1,699,687
1,338,300
0
0
0
229,065
614,400
1,151,000
5,000
670,000
0
0
1,000,000
2,854,000
3,050,000
304,000
0
7,302,881
3,132,599
70,000
470,000
0
1,471,000
6,300,000
0
2,662,107
2,124,527
1,260,178
37,971,744
2002-2003
TOTAL CIP
APPROPR.
488,010
468,584
130,535
14,981,611
16,137,578
3,008,097
6,069,443
216,870
0
126,149
279,232
1,798,985
1,162,349
18,000
1,203,128
0
4,622,393
1,219,100
5,533,281
21,513,451
884,335
2,660,211
13,572,150
10,748,572
138,849
2,552,593
27,450
1,835,212
7,113,268
319,814
7,424,115
35,555,531
13,376,560
175,185,456
JUNE 30, 2003
PROJECTED
BALANCE
2,236
4,835,841
1,518,395
18,886,509
819,525
1,225,105
4,287,325
0
925,854
16,340
12,819
9,528,751
730,021
856,576
628,433
295,699
298,078
430,679
3,005,254
10,233,919
128
2,783,851
17,232,656
6,054,554
1,469
4,682,434
0
75,312
69,213
321,751
3,311,637
937,529
14,832,146
108,840,037
C-13
CITY OF CARLSBAD
CAPITAL FUNDS
REVENUES ACTUAL AND ESTIMATED
FUND
ASSESSMENT DISTRICTS
BTD#2 - POINSETTIA LANE/AVIARA PKWY
BTD#3 - CANNON ROAD WEST
CFD#1 -CITYWIDE
CFD #2 - RANCHO SANTA FE ROAD
GAS TAX
GENERAL CAPITAL CONST.
GOLF COURSE
GRANTS -COUNTY
GRANTS -FEDERAL
GRANTS -STATE
INFRASTRUCTURE MAINT & REPL
OTHER
PARK FEE ZONES 5,13,16
PARK-IN-LIEU NE
PARK-IN-LIEU NW
PARK-IN-LIEU SE
PARK-IN-LIEU SW
PLANNED LOCAL DRAIN'S
PUBLIC FACILITIES FEE
REDEVELOPMENT BONDS
SEWER BENEFIT AREAS
SEWER CONNECTION
SEWER REPLACEMENT
TDA
TRAFFIC IMPACT FEE
TRANSNET/BIKE
TRANSNET/HIGHWAY
TRANSNET/LOCAL
TRANSNET/STP
WATER - MAJOR FACILITY
WATER - RECYCLED WATER
WATER - REPLACEMENT
TOTAL CAPITAL FUNDS
1998-99
ACTUAL
REVENUES
9,494,392
213,180
291,424
15,184,782
2,247,234
1,610,623
1,581,221
289,482
293,629
79,745
45,414
N/A
2,471,355
1,203,795
69,997
207,517
701,093
326,350
1,061,677
8,562,805
254,554
452,181
5,200,226
1,750,325
321,253
1,691,916
1,524
3,310,960
4,103,007
98,380
3,738,617
1,073,366
2,506,152
49,227,405
1999-2000
ACTUAL
REVENUES
17,402,714
508,690
732,389
13,675,926
7,881,331
1,621,261
1,048,117
299,443
392,844
63,526
341,082
2,056,779
426,600
251,326
93,634
178,334
505,336
346,922
955,131
9,802,551
112,219
429,837
6,020,054
7,635,353
80,458
2,045,988
1,256
^ 1,030,781
8,248,042
60,903
4,182,167
2,091,983
10,683,240
101,206,217
2000-2001
ACTUAL
REVENUE
99,664
1,196,818
294,547
13,431,776
1,817,868
2,058,987
5,470,004
0
821,023
17,008
1,593,186
3,415,471
328,364
197,908
107,109
299,488
575,018
327,437
818,567
11,200,696
65,394
1,193,530
6,273,019
3,517,708
216,490
2,274,739
0
85,482
2,186,597
127,491
4,746,830
652,387
4,159,407
69,570,013
2001-2002
ESTIMATED
REVENUE
16,668
579,115
103,266
5,918,573
1,065,538
1,796,655
3,892,720
0
38,389
815,148
791,622
3,354,978
515,974
160,590
436,254
369,488
173,671
290,775
1,774,079
5,102,603
20,226
371,173
8,798,731
2,365,171
27,422
1,174,330
200,000
28,861
251,548
44,127
2,961,560
2,755,738
34,320,300
80,515,293
2002-2003
ESTIMATED
REVENUE
0
1,620,700
135,252
3,870,758
0
2,469,687
0
0
0
0
0
3,600,000
1,151,000
141,794
342,211
32,619
86,664
8,889
603,266
3,397,914
0
400,000
1,977,500
1,400,000
70,000
929,395
0
1,211,000
4,600,000
0
3,841,860
817,740
160,000
32,868,249
Note: Revenues include interfund loans and transfers.
C-14
CITY OF CARLSBAD
CAPITAL FUNDS
BUDGET EXPENDITURE SCHEDULE
FUND
ASSESSMENT DISTRICTS
BTD#2 - POINSETTIA LANE/AVIARA PKWY
BTD#3 - CANNON ROAD WEST
CFD#1 -CITYWIDE
CFD #2 - RANCHO SANTA FE ROAD
GAS TAX
GENERAL CAPITAL CONST.
GOLF COURSE
GRANTS - COUNTY
GRANTS - FEDERAL
GRANTS -STATE
INFRASTRUCTURE MAINT & REPL
OTHER
PARK FEE ZONES 5,13,16
PARK-IN-LIEU NE
PARK-IN-LIEU NW
PARK-IN-LIEU SE
PARK-IN-LIEU SW
PLANNED LOCAL DRAIN'G
PUBLIC FACILITIES FEE
REDEVELOPMENT BONDS
SEWER BENEFIT AREAS
SEWER CONNECTION
SEWER REPLACEMENT
TDA
TRAFFIC IMPACT FEE
TRANSNET/BIKE
TRANSNET/HIGHWAY
TRANSNET/LOCAL
TRANSNET/STP
WATER - MAJOR FACILITY
WATER - RECYCLED WATER
WATER - REPLACEMENT
TOTAL CAPITAL FUNDS
1999-2000
ACTUAL
11,924,563
1,213,557
742,315
16,748,124
3,661,865
533,719
1,822,728
1,114,278
1,670,154
6,834
280,296
0
2,588,302
4,330,562
0
0
0
18,900
917,040
2,339,380
10,733
466,244
2,085,199
721,280
160,468
1,656,187
27,603
905,021
2,520,005
0
2,698,172
322,818
1,388,764
62,875,111
2000-2001
ACTUAL
84,523
1,129,000
499,500
2,979,486
946,720
258,440
1,812,074
805,291
200,000
17,008
36,228
0
392,320
10,184
0
408,402
0
0
655,081
9,156,779
43,316
756,933
1,587,897
2,389,869
129,000
1,225,108
0
209,467
718,530
68,047
1,862,247
166,387
1,407,665
29,955,502
2001-2002 (1)
ESTIMATED
123,280
(522,183)
1,833,041
17,869,178
1,634,098
7,028,422
2,399,299
129,864
300,000
683,718
2,426,173
1,033,915
660,611
3,644
209,021
421,799
745,973
(532,075)
947,100
7,504,950
57,989
389,809
10,015,035
2,915,378
145,408
236,288
172,550
230,239
6,932,324
852,139
3,649,146
1,822,245
1,323,450
73,641,828
2001-2002
CONTINUING
APPROPR.
335,010
468,584
130,535
14,871,611
16,137,578
1,308,410
4,731,143
216,870
0
126,149
50,167
1,184,585
11,349
13,000
533,128
0
4,622,393
219,100
2,679,281
18,463,451
580,335
2,660,211
6,269,269
7,615,973
68,849
2,082,593
27,450
364,212
813,268
319,814
4,762,008
33,431,004
12,116,382
137,213,712
2002-2003
NEW
APPROPR.
153,000
0
0
110,000
0
1,699,687
1,338,300
0
0
0
229,065
614,400
1,151,000
5,000
670,000
0
0
1,000,000
2,854,000
3,050,000
304,000
0
7,302,881
3,132,599
70,000
470,000
0
1,471,000
6,300,000
0
2,662,107
2,124,527
1,260,178
37,971,744
2002-2003
TOTAL CIP
APPROPR.
488,010
468,584
130,535
14,981,611
16,137,578
3,008,097
6,069,443
216,870
0
126,149
279,232
1,798,985
1,162,349
18,000
1,203,128
0
4,622,393
1,219,100
5,533,281
21,513,451
884,335
2,660,211
13,572,150
10,748,572
138,849
2,552,593
27,450
1,835,212
7,113,268
319,814
7,424,115
35,555,531
13,376,560
175,185,456
(1) 2001-2002 estimated amount includes actual expenditures and encumbrances.
C-15
C-16
' •''/•' '^"j;';:!^\':l ;';V^?-'i';;-.Mllil|^py'
•- - ' " ;.'•<• ^, >>:*_,_";'", \',, -, " "<''•;; \^V;;^'^*«jA^;V*+**;^1l!l^ii^^^^«k>i «';
•«-*t- -':.;-..-- ;^:Vv';;|^;.'i;:i^Y'''^§M
, '•--,':. .:.: .:. ^••^^^•^yiSi^
, .:;'.: V^S^JpS^II"^'"
i&="Jl^:atS;:S^^fe«
C-17
DETAIL SCHEDULE OF CAPITAL PROJECTS BY CATEGORY
FISCAL YEARS 2002/2003 TO BUILD OUT
PROJECT
JOB KEY
38311
NEW
34411
35721
35722
36551
36851
36951
36881
36861
32441
33701
34553
34554
NEW
34691
34692,93
36341
38611
35081
36511
36501
36531
35101
38321
38331
38341
3516/77
36381
35761
36422
35151
36651
35781
30721
PROJECT TITLE
CIVIC PROJECTS
AMERICANS WITH DISABILITES ACT (ADA) PROJECTS
ADA - CANNON PARK
HOLIDAY PARK - RESTROOM IMPROVEMENTS
ADA - MISCELLANEOUS FACILITY MODIFICATIONS
ADMINISTRATIVE FACILITIES
CITY HALL
PUBLIC WORKS CENTER
PUBLIC WORKS CENTER
PUBLIC WORKS CENTER
POLICE & FIRE FACILITIES
POLICE & FIRE CAD IMPLEMENTATION
POLICE & FIRE TRAINING FACILITY FEASIBILITY STUDY
FIRE STATION # 3 RELOCATION
FIRE STATION #5 STORAGE BUILDING/RESTROOMS
FIRE STATION #6 - (PERMANENT)
POLICE TRAINING RANGE - RELOCATION
LIBRARY FACILITIES
COLE LIBRARY EXPANSION (35%)
COLE LIBRARY EXPANSION (65%)
SOUTH CARLSBAD LIBRARY
SOUTH CARLSBAD LIBRARY
MISCELLANEOUS PROJECTS
COASTAL RAIL TRAIL (CMAQ) - PROJECT STUDY REPORT
COASTAL RAIL TRAIL
COASTAL RAIL TRAIL - CORRIDOR ENHANCEMENT
CFD#1 ADMINISTRATION
OPPORTUNISTIC SAND PROGRAM
OPPORTUNISTIC SAND PROGRAM
PUBLIC WORKS INVENTORY AND FAC MAINT PROGRAM
SENIOR CENTER COURTYARD LANDSCAPING
REDEVELOPMENT PROJECTS
DOWNTOWN STREET LIGHTING ENHANCEMENT STUDY
VILLAGE AREA STREET FURNITURE AND PLANTERS
VILLAGE PUBLIC PARKING ENHANCEMENT PROGRAM
VILLAGE PUBLIC RELATIONS CAMPAIGN
SUBTOTAL CIVIC PROJECTS
FACILITIES MAINTENANCE
ASBESTOS SURVEY
CALAVERA HILLS CENTER - OFFICE EXPANSION
HARDING CENTER - FANS
HARDING CENTER - KITCHEN REMODEL
MISCELLANEOUS FACILITIES MAINTENANCE
SAFETY CENTER - BUILDING IMPROVEMENTS
SAFETY CENTER - CONFERENCE CENTER REFURBISHMENT
SENIOR CENTER - RECOAT ROOF
SENIOR CENTER FLOOR REPLACEMENT
WATER DISTRICT - REPAIR/REPLACE CONCRETE ENTRANCE
SUBTOTAL FACILITIES MAINTENANCE
PARK PROJECTS
CITYWIDE PARKS
BUSINESS PARK RECREATIONAL FACILITY
CARLSBAD MUNICIPAL GOLF COURSE
VETERAN'S MEMORIAL PARK
FUND
GCC
IM&R
GCC
CFD#1
CFD#1
WATER REPL
SEWER REPL
GCC
GCC
PFF
GCC
PFF
GCC
CFD#1
PFF
PFF
CFD#1
FED GRNT
TRANSNET/BIKE
GCC
CFD#1
GCC
ST GRANT
GCC
GCC
REDVL BONDS
REDVL BONDS
REDVL BONDS
REDVL BONDS
GCC
GCC
GCC
GCC
GCC
GCC
GCC
IM&R
GCC
WATER REPL
ZONES
GOLF COURSE
CFD#1
TOTAL
BUDGET
70,500
162,200
741,000
20,270,000
10,493,000
4,600,000
2,200,000
2,221,000
45,000
895,000
216,600
1,025,000
950,000
4,608,000
8,320,000
396,417
14,450,995
1,568,000
200,000
110,000
1,430,000
65,542
138,898
390,000
30,000
65,000
95,000
759,215
50,000
76,566,367
40,000
25,000
10,000
20,000
506,561
50,000
200,000
240,000
65,000
20,000
1,176,561
2,644,000
5,810,405
16,129,000
PRIOR
EXP/ENC
25,699
543,615
1,477,597
864,822
27,500
17,483
91,952
393,483
14,353,672
1,441,851
172,550
46,175
113,175
275,763
10,000
59,978
0
14,902
19,930,217
12,916
1,227
0
7,650
471,267
18,382
54,458
24,893
3,034
593,827
5,593,535
C-18
DETAIL SCHEDULE OF CAPITAL PROJECTS BY CATEGORY
FISCAL YEARS 2002/2003 TO BUILD OUT
BALANCE
FORWARD
YEAR1
2002-2003
YEAR 2
2003-2004
YEARS
2004-2005
YEAR 4
2005-2006
YEARS
2006-2007
YEAR 6-10
2007-2012
BUILDOUT
2012 +
22,301
56,385
9,015,403
4,600,000
2,200,000
1,356,178
17,500
199,117
858,048
2,934
97,323
126,149
27,450
19,367
25,723
114,237
30,000
55,000
15,022
495,215
15,098
19,348,450
27,084
23,773
10,000
12,350
35,294
31,618
110,542
40,107
16,966
307,734
13,000
216,870
22,500
162,200
141,000
10,135,000 10,135,000
895,000
25,000 1,000,000
4,608,000
8,320,000
110,000
110,000 110,000 110,000 110,000 110,000 550,000 330,000
20,000
264,000
20,000
874,700 110,000 11,245,000 11,140,000 110,000 13,478,000 330,000
35,000
240,000
275,000 - - - - •
5,000 2,626,000
8,064,000 8,065,000
C-19
DETAIL SCHEDULE OF CAPITAL PROJECTS BY CATEGORY
FISCAL YEARS 2002/2003 TO BUILD OUT
PROJECT
JOB KEY PROJECT TITLE
NORTHWEST QUADRANT PARKS
NEW BEACH ACCESS IMPROVEMENTS
CANNON LAKE PARK (6.7 ACRES)
36351 CHASE FIELD BATHROOM/SNACK BAR BLDG REPL
38631 HOLIDAY PARK - PLAYGROUND EQUIPMENT
HOSP GROVE/BUENA VISTA LAGOON REC'L IMPROVEMENTS
36961 KRUGER HOUSE PRE-SCHOOL TOT LOT
351 91 MISCELLANEOUS BEACH ACCESS REPAIRS/UPGRADES
38022 PARK SITE DEVELOPMENT - PINE SCHOOL
NEW SWIM COMPLEX - FILTRATION/HEATING RENOVATIONS
NORTHEAST QUADRANT PARKS
38561 LARWIN COMMUNITY PARK (22.3 ACRES)
PARK RESTORATION AND ACQUISITION
36981 PARK SITE ACQUISITION (15 ACRES) NE QUADRANT PARK
38011 PARK SITE DEVELOPMENT (15 ACRES)
SOUTHWEST QUADRANT PARKS
36991 AVIARA COMMUNITY PARK (24.25 ACRES) *
36491 AVIARA REIMBURSEMENT AGREEMENT
PARK RESTORATION AND ACQUISITION
POINSETTIA COMMUNITY PARK - PHASE II
38361 POINSETTIA COMMUNITY PARK - SOCCER FIELD STAIRS
38641 POINSETTIA COMMUNITY PARK - SYNTHETIC SOCCER FIELD
FUND
IM&R
PFF
GCC
IM&R
PIL-NW
GCC
GCC
PFF
IM&R
PIL-NE
PIL-NE
PFF
PIL-NE
PFF
PIL-SW
PIL-SW
PFF
GCC
IM&R
TOTAL
BUDGET
50,000
947,000
190,000
85,000
2,980,000
35,000
70,000
6,896,000
162,200
1,220,000
4,500,000
4,550,000
3,000,000
11,997,890
238,000
2,700,000
7,200,000
85,000
700,000
PRIOR
EXP/ENC
48,835
58,548
189,990
16,872
881,495
18,900
9,689
5,400
(*) AVIARA COMMUNITY PARK - $1,725,000 L/C FROM A VIARA LAND ASSOCIATES IS AVAILABLE IF NEEDED TO CONSTRUCT PHASE 1
SOUTHEAST QUADRANT PARKS
38371 ALGA NORTE LAND ACQUISITION
38372 ALGA NORTE PARK - PHASE I (30 ACRES)
ALGA NORTE PARK - PHASE II (50 METER POOL)
34561 LEO CARRILLO PARK - PHASE I & II
LEO CARRILLO PARK - PHASE III
35791 STAGECOACH PARK DRAIN (LOWER LEVEL)
38381 STAGECOACH PARK - TENNIS ACCESS WALKWAY
SUBTOTAL PARK PROJECTS
DRAINAGE PROJECTS
38041 AVIARA PARKWAY STORM DRAIN REIMBURSEMENT (PLDA "C")
36241 CARLSBAD BLVD STORM DRAIN REPLACEMENT
COLLEGE BLVD/CANNON RD REACH 3 DRAINAGE FACILITIES
COLLEGE BOULEVARD STORM DRAIN (REIMB./PLDA "B")
33381 DRAINAGE CHANNEL AND DESILTATION BASIN/CANNON RD (PLDA "B")
36225 FARADAY/MELROSE DRAINAGE FACILITIES (PLDA "B")
38651 LA COSTA AVENUE STORM DRAIN REPLACEMENT
NEW MASTER PLAN UPDATE
MISCELLANEOUS MASTER DRAINAGE FACILITIES
3681 1 MISCELLANEOUS ROAD SUBDRAINS
3681 2 MISCELLANEOUS ROAD SUBDRAINS
36813 MISCELLANEOUS ROAD SUBDRAINS
PARK DRIVE AND TAMARACK AVENUE STORM DRAIN (PLDA "B")
35281 SOUTH CARLSBAD VILLAGE STORM DRAIN
35282 SOUTH CARLSBAD VILLAGE STORM DRAIN
35284 SOUTH CARLSBAD VILLAGE STORM DRAIN
35283 SOUTH CARLSBAD VILLAGE STORM DRAIN (PLDA "B")
TAMARACK AND ECR STORM DRAIN AND SILT. BASIN (REIMB./PLDA "B")
38391 TAMARACK AND SUNNYHILL DRAINAGE MODIFICATIONS
36901 TORREJON PLACE STORM DRAIN RELINING
SUBTOTAL DRAINAGE PROJECTS
PIL-SE
PFF
PFF
PFF
PFF
GCC
GCC
PLD
IM&R
PLD
PLD
PLD
PLD
IM&R
PLD
PLD
GAS TAX
GCC
IM&R
PLD
TRANSNET-LOC
GAS TAX
TRANSNET/STP
PLD
PLD
GCC
GCC
4,800,000
8,250,000
5,936,000
5,568,000
1,703,000
15,000
25,000
98,486,495
290,000
80,000
2,600,000
2,100,000
1,260,459
1,200,000
128,500
254,000
10,936,000
10,000
200,000
275,000
500,000
4,700,000
3,400,000
1,240,000
1,160,000
1,279,000
30,000
80,000
31,722,959
177,607
13,499
5,054,348
6,581
12,075,299
9,600
419,504
68,379
16,169
438
4,669,543
3,235,726
920,186
733,695
11,400
10,084,640
C-20
DETAIL SCHEDULE OF CAPITAL PROJECTS BY CATEGORY
FISCAL YEARS 2002/2003 TO BUILD OUT
BALANCE
FORWARD
YEAR1
2002-2003
YEAR 2
2003-2004
YEAR 3
2004-2005
YEAR 4
2005-2006
YEARS
2006-2007
YEAR 6-10
2007-2012
BUILDOUT
2012 +
141,165
85,000
35,000
11,452
510,010
533,128
4,550,000
10,116,395
219,100
75,311
694,600
4,622,393
236,501
513,652
15,000
18,419
22,606,996
280,400
840,955
1,131,621
112,331
9,562
200,000
275,000
30,457
164,274
319,814
426,305
18,600
80,000
3,889,319
50,000
947,000
2,980,000
900,000 5,296,000
162,200
670,000
4,500,000
3,000,000
1,000,000
2,700,000
600,000 6,600,000
700,000 7,300,000
5,936,000
1,703,000
3,487,200 12,596,000 600,000 6,600,000 - 14,000,000 26,521,000
80,000
2,600,000
2,100,000
254,000
10,936,000
500,000
1,279,000
2,854,000 80,000 - - - 500,000 14,315,000
C-21
DETAIL SCHEDULE OF CAPITAL PROJECTS BY CATEGORY
FISCAL YEARS 2002/2003 TO BUILD OUT
PROJECT
JOB KEY
34891
34111
36691
36681
38071
38061
34491
36701
36661
35811
33221
34941
38911
36224
34951
36561
NEW
35371
35381
38091
35391
38101
34511
38081
38401
34521
38701
38702
33241
3828/3583
38551
34921
38861
31821
31822
38671
33762
33761
38411
38421
35341
PROJECT TITLE
SEWER PROJECTS
ENCINA WATER POLLUTION CONTROL FACILITY
BUILDING IMPROVEMENTS
CAPITAL ACQUISITIONS - UNIT I
CAPITAL PLANNING /SERVICES
COGENERATION REHABILITATION
FLOW EQUALIZATION PROJECT
PHASE IV EXPANSION - DEBT SERVICE
PHASE V EXPANSION
PHASE V EXPANSION - INTERIM CAPACITY
PLANT REHABILITATION
PUMP STATION INTERFACES
TECHNOLOGY MASTER PLAN
SEWER COLLECTION SYSTEM
AVENIDA ENCINAS GRAVITY SEWER
BUENA VISTA LIFT STATION
BUENA VISTA LIFT STATION PUMP ADDITION
CARLSBAD TRUNK SEWER REACHES VCT1A, VCT1B, VCT1C (SBA "A")
CHINQUAPIN LIFT STATION
EL CAMINO REAL SEWER - CHESTNUT TO TAMARACK
FARADAY AVENUE - ORION TO MELROSE SEWER
FOREST GRAVITY SEWER
FOXES SEWAGE LIFT STATION UPGRADE
HOME PLANT LIFT STATION
LA COSTA MEADOWS SEWER EXTENSION
LA GOLONDRIA SEWER EXTENSION
NIGHTSHADE GRAVITY SEWER EXTENSION
NORTH AGUA HEDIONDA INTERCEPTOR REHAB - EL CAMINO REAL/KELLY
NORTH AGUA HEDIONDA INTERCEPTOR REHABILITATION
NORTH AGUA HEDIONDA TRUNK SEWER REACH NAHT1A
NORTH BATIQUITOS INTERCEPTOR REHABILITATION
NORTH BATIQUITOS SEWAGE LIFT STATION MODIFICATIONS
PALMER WAY SEWER EXTENSION
POINSETTIA LANE SEWER RELOCATION
POINSETTIA SEWAGE LIFT STATION ODOR/NOISE ABATEMENT
SEWER ACCESS HOLE REHABILITATION
SEWER CONNECTION FEE UPDATE
SEWER LIFT STATION REPAIRS AND UPGRADES
SEWER LINE REFURBISHMENTS/REPLACEMENT
SEWER MASTER PLAN UPDATE
SEWER MASTER PLAN UPDATE
SEWER MONITORING PROGRAM
SOUTH AGUA HEDIONDA LIFT STATION AND FORCE MAIN
VISTA/CARLSBAD INTERCEPTOR - PAVEMENT OVERLAY
VISTA/CARLSBAD INTERCEPTOR AGUA HEDIONDA LIFT STATION (VC12)
VISTA/CARLSBAD INTERCEPTOR REACH VC11B
VISTA/CARLSBAD INTERCEPTOR REACH VC13 TO VC15
VISTA/CARLSBAD INTERCEPTOR REACH VC5A, 5B TO VC1 1 A
VISTA/CARLSBAD INTERCEPTOR REACH VC5A, 5B TO VC11A
VISTA/CARLSBAD INTERCEPTOR REHAB REACHES 1 THROUGH 3
SUBTOTAL SEWER PROJECTS
WATER DISTRIBUTION SYSTEM
"D" RESERVOIR - PHASE II
"D" RESERVOIR - PHASE II
580 ZONE SECONDARY SUPPLY
680 ZONE SUPPLY
AVIARA PARKWAY- POINSETTIA LANE TO PALOMAR AIRPORT ROAD
CALAVERA HILLS WATER BOOSTER STATION STANDBY GENERATOR
CANNON ROAD WEST TRANSMISSION MAIN
FUND
SEWER CONN
SEWER CONN
SEWER REPL
SEWER REPL
SEWER CONN
SEWER CONN
SEWER CONN
SEWER CONN
SEWER REPL
SEWER REPL
SEWER CONN
SEWER REPL
SEWER CONN
SEWER CONN
SEW BENEF
SEWER REPL
SEWER REPL
SEWER REPL
SEWER REPL
SEWER REPL
SEWER REPL
SEWER REPL
SEWER REPL
SEWER CONN
SEWER REPL
SEWER REPL
SEWER REPL
SEWER REPL
SEWER REPL
SEWER REPL
SEWER REPL
SEWER REPL
SEWER REPL
SEWER CONN
SEWER REPL
SEWER REPL
SEWER CONN
SEWER REPL
SEWER CONN
SEW BENEF
TRANSNET-LOC
SEWER CONN
SEWER CONN
SEWER CONN
SEWER CONN
SEWER REPL
SEWER REPL
WATER CONN
WATER REPL
WATER CONN
WATER CONN
WATER CONN
WATER CONN
WATER CONN
TOTAL
BUDGET
1,787,249
3,415,037
1,910,023
581,447
8,189,252
13,082,183
11,692,762
222,297
2,908,523
59,662
1,160,942
175,000
502,132
233,000
455,000
450,000
420,000
110,200
800,000
2,185,000
285,000
175,000
150,000
150,000
620,000
1,587,600
1,533,200
1,000,000
332,000
125,000
400,000
221,800
2,800,000
15,000
235,380
7,868,182
205,698
98,792
587,138
7,661,494
695,880
6,250,000
2,900,000
10,200,000
12,223,433
702,020
377,075
109,739,401
3,984,500
1,328,000
256,000
550,000
495,000
250,000
2,864,457
PRIOR
EXP/ENC
486,916
525,624
235,524
41,329
76,453
157,995
1,113,297
25,000
312,661
245,211
449,437
11,110
110,200
26,431
2,069,081
133,800
928
102,404
39,717
116,382
5,641
57,513
647,406
195,232
98,792
152,586
1,735,283
644,680
88,499
42,591
10,650,058
543,172
1,393
21,142,346
2,257,707
C-22
DETAIL SCHEDULE OF CAPITAL PROJECTS BY CATEGORY
FISCAL YEARS 2002/2003 TO BUILD OUT
BALANCE
FORWARD
YEAR1
2002-2003
YEAR 2
2003-2004
YEAR 3
2004-2005
YEAR 4
2005-2006
YEARS
2006-2007
YEAR 6-10
2007-2012
BUILDOUT
2012 +
206,398
98,820
267,445
2,734,201
713,406
64,302
232,196
17,649
28,559
256,921
563
408,890
273,569
115,919
616,200
399,072
34,800
22,596
360,283
783,618
9,359
177,867
1,220,776
10,466
54,552
2,660,211
51,200
261,501
257,409
1,573,375
158,848
325,682
14,396,653
606,750
1,093,935
124,050 124,050
112,099 112,099
2,542,735
942,161 936,199
7,467,810
124,050
112,099
936,256
124,050 124,050 657,868
112,099 52,101 276,135
259,016
2,870,987
939,581 936,394 4,671,045
1,512,475
630,422
322,431
3,720,547
3,435,093
66,987 74,430 74,430 74,430 74,430 394,479 803,844
17,013
375,127 444,595
175,000
233,000
100,000 355,000
500,000
35,000 250,000
50,000
50,000
50,000
125,000
100,000
100,000
620,000
837,600
158,000 1,375,200
600,000
297,200
21,700 200,100
100,000 100,000 100,000 100,000 100,000 500,000 900,000
300,000 300,000 300,000 300,000 300,000 1,500,000 3,000,000
20,000 20,000 20,000 20,000 100,000 200,000
3,266,000
769,360 5,130,640
2,600,000
500,000 4,700,000 5,000,000
50,000
10,435,480 10,842,688 8,761,395 12,480,800 1,606,975 11,837,657 18,235,407
3,984,500
1,328,000
256,000
550,000
495,000
50,000 200,000
C-23
DETAIL SCHEDULE OF CAPITAL PROJECTS BY CATEGORY
FISCAL YEARS 2002/2003 TO BUILD OUT
PROJECT
JOB KEY
35991
38171
36631
34461
38441
NEW
38431
38161
38691
36223
35691
38211
38231
38221
35311
34791
35851
34421
36581
38581
35491
38191
38531
35301
NEW
36641
38703
38704
34861
35861
38291
36751
36753
38871
38881
38891
36752
34871
PROJECT TITLE
CARLSBAD BOULEVARD - MANZANO DRIVE TO AVENIDA ENCINAS
CARLSBAD BOULEVARD - MANZANO DRIVE TO AVENIDA ENCINAS
COLLEGE BOULEVARD - CANNON ROAD TO CARLSBAD VILLAGE DRIVE
COLLEGE BOULEVARD - EL CAMINO REAL TO AGUA HEDIONDA CREEK
COLLEGE BOULEVARD (33" LINE TO CANNON ROAD)
COLLEGE BOULEVARD- MAERKLE RESERVOIR TO AGUA HEDIONDA CREEK
EL CAMINO REAL - PALOMAR AIRPORT ROAD SOUTH
EL CAMINO REAL CROSSING AT KELLY DRIVE
EL CAMINO REAL TRANSMISSION MAIN - LISA STREET TO KELLY DRIVE
EL CAMINO REAL TRANSMISSION MAIN FROM CASSIA TO POINSETTIA
EL CAMINO REAL TRANSMISSION MAIN FROM FARADAY TO COUGAR DRIVE
ELFUERTE - NORTH OF LOKER
EL FUERTE - ALGA ROAD TO POINSETTIA LANE
EL FUERTE - FARADAY TO MAERKLE RESERVOIR
EL FUERTE - POINSETTIA LANE TO PALOMAR AIRPORT ROAD
FARADAY AVENUE - ORION TO MELOROSE WATERLINE
FOUSSAT ROAD WELL ABANDONMENT
INTERSTATE 5 CROSSING
LAKE CALAVERA RESERVOIR IMPROVEMENTS
MARRON ROAD - PRESSURE REGULATING STATION TO OCEANSIDE
MISCELLANEOUS PIPELINE REPLACEMENT PROJECTS
MISCELLANEOUS STORAGE TANK REPAIRS
MISCELLANEOUS WATER RESERVOIR FENCING
NORTH AGUA HEDIONDA TRANSMISSION MAIN
OCEANSIDE INTERTIE UPGRADE
PALOMAR AIRPORT - NORTH OF OWENS
POINSETTIA LANE - EL CAMINO REAL TO "D" RESERVOIR
POINSETTIA LANE - EL FUERTE TO EL CAMINO REAL
POINSETTIA LANE - PASEO DEL NORTE TO CARLSBAD BOULEVARD
POINSETTIA LANE- FROM "D" RESERVOIR TO AMBROSIA LANE
PRESSURE REGULATING STATION - CANNON ROAD AND COLLEGE BLVD.
RANCHO CARRILLO OVERSIZING/EXTENSION
SEAWATER DESALINATION PROGRAMS
TANGLEWOOD PRESSURE REDUCING STATION REPLACEMENT
TAP NO. 2 RESERVOIR
TAP RESERVOIR EXTERIOR PAINTING
TRI-AGENCY PIPELINE EROSION PROTECTION
WATER CERTIFICATE OF PARTICIPATION (COP) PAYMENTS (16%)
WATER CERTIFICATE OF PARTICIPATION (COP) PAYMENTS (84%)
WATER OPERATIONS WATER PUMP PROJECT
WATER SYSTEM INTERTIE CONNECTION
WATER/SEWER MASTER PLAN UPDATE
WATER/SEWER MASTER PLAN UPDATE
SUBTOTAL WATER DISTRIBUTION SYSTEM
RECYCLED WATER PROJECTS
DEBT SERVICE ON STATE LOAN
INDUSTRIAL PARK SYSTEM
I-5 RECYCLED WATER TRANSMISSION LINE
RECYCLED LINE - POINSETTIA BRIDGE
RECYCLED WATER PH II
RECYCLED WATER PH II - TREATMENT FACILITY
RECYCLED WATER PH II - PIPELINES
RECYCLED WATER PH II - FLOW EQUALIZATION
RECYCLED WATER PH II - PUMP STATIONS
RECYCLED WATER PROG-PHASE II
PUMP STATION UPGRADE
SUBTOTAL RECYCLED WATER PROJECTS
FUND
WATER CONN
WATER REPL
WATER CONN
WATER CONN
WATER CONN
WATER REPL
WATER REPL
WATER CONN
WATER CONN
WATER CONN
WATER REPL
WATER CONN
WATER CONN
WATER CONN
WATER CONN
WATER CONN
WATER REPL
WATER CONN
WATER REPL
WATER REPL
WATER REPL
WATER REPL
WATER REPL
WATER CONN
WATER REPL
WATER CONN
WATER CONN
WATER CONN
WATER CONN
WATER CONN
WATER CONN
WATER CONN
WATER REPL
WATER REPL
WATER CONN
WATER REPL
WATER REPL
WATER REPL
WATER CONN
WATER REPL
WATER REPL
WATER REPL
WATER CONN
RECL WATER
RECL WATER
RECL WATER
RECL WATER
RECL WATER
RECL WATER
RECL WATER
RECL WATER
RECL WATER
WATER REPL
RECL WATER
TOTAL
BUDGET
133,000
142,000
550,000
235,000
421,000
2,340,000
3,225,000
94,000
250,000
835,800
660,000
148,750
2,000,000
330,000
820,000
97,210
150,000
982,000
1,650,000
604,000
1,400,000
170,000
110,000
130,000
100,000
150,000
2,700,000
2,800,000
375,000
322,000
250,000
90,000
649,860
120,000
1,750,000
120,000
150,000
391,450
2,055,110
55,000
400,000
124,580
31,145
39,839,862
1,880,702
1,179,539
140,000
240,000
600,000
12,860,000
15,800,000
2,970,000
2,600,000
4,000,000
400,000
42,670,241
PRIOR
EXP/ENC
10,501
174,805
512
1,057,880
97,210
914,186
178,466
24,500
11,945
12,492
659,040
194,231
71,913
33,497
6,000
552
34,774
102,206
27,019
5,869,436
316,328
19,595
157,797
584,285
1,519,724
806
2,388,767
4,987,302
C-24
DETAIL SCHEDULE OF CAPITAL PROJECTS BY CATEGORY
FISCAL YEARS 2002/2003 TO BUILD OUT
BALANCE
FORWARD
YEAR1
2002-2003
YEAR 2
2003-2004
YEAR 3
2004-2005
YEAR 4
2005-2006
YEARS
2006-2007
YEAR 6-10
2007-2012
BUILDOUT
2012 +
50,000
172,874
3,050,195
50,000
49,488
942,120
25,000
67,814
1,471,534
145,500
98,055
137,508
2,040,960
180,769
250,087
90,000
616,363
144,000
69,448
365,226
22,374
4,126
10,650,191
863,211
120,405
82,203
15,715
12,500,000
14,280,276
2,970,000
2,599,194
1,611,233
35,042,237
133,000
142,000
500,000
51,625
421,000
2,340,000
94,000
200,000
835,800
610,000
148,750
305,000
820,000
150,000
604,000
200,000 400,000 400,000 400,000
30,000 100,000
100,000
2,800,000
250,000
20,000 100,000
100,000 100,000 1,400,000
50,000
150,000
195,178 196,272
1,024,682 1,030,428
55,000
3,922,285 4,155,450 400,000 500,000 500,000 13,842,500
159,527 159,527 159,527 159,527 159,527 797,635 285,432
360,000
400,000
519,527 559,527 159,527 159,527 159,527 797,635 285,432
C-25
DETAIL SCHEDULE OF CAPITAL PROJECTS BY CATEGORY
FISCAL YEARS 2002/2003 TO BUILD OUT
PROJECT
JOB KEY PROJECT TITLE
CIRCULATION SYSTEM
TRAFFIC SIGNAL PROJECTS
TRAP SIG - ALGA ROAD AND CAZADERO
NEW TRAP SIG - ALGA ROAD AND XANA WAY
33691 TRAP SIG - AVIARA PARKWAY-POINSETTIA LANE TO EL CAMINO REAL
33692 TRAP SIG - AVIARA PARKWAY-POINSETTIA LANE TO EL CAMINO REAL
33693 TRAP SIG - AVIARA PARKWAY-POINSETTIA LANE TO EL CAMINO REAL
NEW TRAP SIG - CALLE BARCELONA AND PASEO ALISO
NEW TRAP SIG - CALLE BARCELONA AND PASEO AVELLANO
TRAP SIG - CAMINO DE LOS COCHES AND LA COSTA AVENUE
TRAP SIG - CAMINO VIDA ROBLE AND YARROW DRIVE
FUND
GAS TAX
GCC
TIP
ASMT DIST
GCC
GCC
GCC
PFF
PFF
35251 TRAP SIG - CANNON RD/PASEO DEL NORTE (SEE CANNON RD WID/l-5 TO PASEO DEL NORTE)
TRAP SIG - CANNON ROAD AND AVENIDA ENCINAS
TRAP SIG - CANNON ROAD AND COLLEGE BOULEVARD
PFF
PFF
TRAP SIG - CANNON ROAD AND FARADAY AVE. (SEE FARADAY ROAD EXTENSION STREET PRO.
TRAP SIG - CARLSBAD BOULEVARD AND AVENIDA ENCINAS
38461 TRAP SIG - CARLSBAD BOULEVARD AND CHERRY AVE
TRAP SIG - CARLSBAD BOULEVARD AND OAK AVENUE
TRAP SIG - CARLSBAD BOULEVARD AND STATE STREET
NEW TRAP SIG - CARLSBAD VILLAGE DR. AND CHATHAM RD.
TRAP SIG - CARLSBAD VILLAGE DRIVE AND AVENIDA DE ANITA
38471 TRAP SIG - CARLSBAD VILLAGE DRIVE AND PONTIAC
38481 TRAP SIG - CARLSBAD VILLAGE DRIVE TIMING UPGRADE
TRAP SIG - COLLEGE BOULEVARD AND EL CAMINO REAL
TRAP SIG - COLLEGE BOULEVARD AND CARLSBAD VILLAGE DRIVE
TRAP SIG - COLLEGE BOULEVARD AND LAKE BOULEVARD IN OCEANSIDE
38621 TRAP SIG - COLLEGE BOULEVARD AND TAMARACK
NEW TRAP SIG - EL CAM. REAL/PLAZA/MARRON/HOSP WY
38001 TRAP SIG - EL CAMINO REAL AND POINSETTIA LANE
38451 TRAP SIG - EL CAMINO REAL CORRIDOR STUDY
36461 TRAP SIG - FARADAY AND CANNON ROAD
NEW TRAP SIG - FARADAY AVE. AND CAMINO HILLS DRIVE
TRAP SIG - FARADAY AVENUE AND ORION STREET
3621 1 TRAP SIG - FARADAY AVENUE AND PRIESTLY DRIVE
TRAP SIG - FARADAY AVENUE AND RUTHERFORD ROAD
NEW TRAP SIG - LA COSTA AVENE AND CALLE MADERO
TRAP SIG - LA COSTA AVENUE/NUEVA CASTILLA
TRAP SIG - MELROSE DRIVE AND LA COSTA AVENUE
NEW TRAP SIG - MONROE STREET AND HOSP WAY
36441 TRAP SIG - PALOMAR AIRPORT ROAD AND MELROSE DRIVE
TRAP SIG - PASEO DEL NORTE AND CAR COUNTRY DR
TRAP SIG - POINSETTIA LANE AND BRIGANTINE ROAD
TRAP SIG - POINSETTIA LANE AND EL FUERTE STREET
38591 TRAP SIG - POINSETTIA LANE AND MELROSE DRIVE
38491 TRAP SIG - POINSETTIA LANE AND PASEO ESCUELA
TRAP SIG - POINSETTIA LANE AND SNAPDRAGON DR
TRAP SIG - RANCHO SANTA FE ROAD AND MELROSE DRIVE (SOUTH)
34061 TRAP SIG - RANCHO SANTA FE ROAD AND QUESTHAVEN ROAD
NEW TRAP SIG - TAMARACK AVE. AND PONTIAC DRIVE
NEW TRAP SIG - TAMARACK AVE. AND VALLEY STREET
TRAP SIG - TAMARACK AVENUE AND GARFIELD STREET
TRAP SIG - TAMARACK AVENUE AND HIGHLAND DRIVE
SUBTOTAL TRAFFIC SIGNAL PROJECTS
STREET PROJECTS
36161 ALGA RD STREET LIGHTING - ALICANTE ROAD TO EL FUERTE ST
36371 ALGA ROAD MEDIANS
36372 ALGA ROAD MEDIANS
AVENIDA ENCINAS WIDENING - SOUTH OF PALOMAR AIRPORT ROAD
35461 BTD#2/AVIARA PKWY - PALOMAR AIRPORT RD TO COBBLESTONE RD
35951 BTD#2/POINSETTIA LANE - AVIARA PKWY TO BLACK RAIL ROAD
35952 BTD#2/POINSETTIA LANE - AVIARA PKWY TO BLACK RAIL ROAD
36731 BTD#2/POINSETTIA LANE - REACH "C"
36741 BTD#2/POINSETTIA LANE - REACH ES "E,F,G"
PFF
GCC
GAS TAX
GAS TAX
GCC
GAS TAX
GCC
GAS TAX
PFF
PFF
PFF
GCC
TRANSNET-LOC
PFF
GCC
PFF
GCC
TIP
GAS TAX
GCC
GCC
GCC
PFF
GCC
PFF
GAS TAX
GCC
PFF
PFF
GAS TAX
GAS TAX
PFF
GCC
GCC
GCC
PFF
PFF
GAS TAX
GCC
IM&R
TIP
BTD#2
BTD#2
PFF
BTD#2
BTD#2
TOTAL
BUDGET
150,000
150,000
30,000
593,000
170,000
150,000
150,000
150,000
125,000
0
150,000
150,000
0
110,000
125,000
150,000
150,000
150,000
80,000
158,550
12,100
115,000
110,000
100,000
150,000
1,200,000
204,250
29,000
125,000
125,000
150,000
150,000
150,000
125,000
125,000
150,000
150,000
250,000
125,000
31,625
150,000
244,676
150,000
125,000
150,000
125,000
125,000
125,000
150,000
150,000
7,963,201
656,358
70,000
1,030,000
870,000
1,611,500
7,098,000
1,822,070
2,291,000
5,987,000
PRIOR
EXP/ENC
10,290
226,172
123,429
12,000
0
67,554
8,091
125,000
119,676
233
692,445
553,870
69,556
1,012,346
501,588
3,809,779
32,636
999,638
87,911
C-26
DETAIL SCHEDULE OF CAPITAL PROJECTS BY CATEGORY
FISCAL YEARS 2002/2003 TO BUILD OUT
BALANCE
FORWARD
YEAR1
2002-2003
YEAR 2
2003-2004
YEARS
2004-2005
YEAR 4
2005-2006
YEARS
2006-2007
YEAR 6-10
2007-2012
BUILDOUT
2012 +
19,710
213,828
35,121
100
100,000
204,250
29,000
57,446
116,909
0
124,767
901,131
102,488
444
17,654
5,912
221
1,789,434
362
462,089
150,000
150,000
153,000
170,000
150,000
150,000
150,000
125,000
150,000
150,000
110,000
125,000
150,000
150,000
150,000
80,000
115,000
110,000
100,000
50,000
1,200,000
125,000
150,000
25,000
150,000
125,000
125,000
150,000
150,000
125,000
125,000
31,625
150,000
125,000
150,000
125,000
150,000
125,000
125,000
150,000
150,000
2,378,000 300,000 275,000 - - 2,991,625 425,000
870,000
1,104,000
2,307,000 981,000
1,291,000
250,000 5,187,000
C-27
DETAIL SCHEDULE OF CAPITAL PROJECTS BY CATEGORY
FISCAL YEARS 2002/2003 TO BUILD OUT
PROJECT
JOB KEY
31841
31844
31845
31842
36821
34371
38501
34441
38541
36171
35571
35921
38511
36362
38141
36361
38121
36071
NEW
36431
33271
36221
36222
35931
36721
36841
38521
36031
36032
34011
38111
36671
36791
38681
36891
35511
38601/35521
NEW
31904
31906
3560
3391
36711
38131
33161
NEW
PROJECT TITLE
BTDS3 CANNON ROAD WEST
BTD#3 CANNON ROAD WEST
BTD#3 CANNON ROAD WEST
BTD#3 CANNON ROAD WEST TR SIGNAL ECR/CANNON
CANNON ROAD REACH 4 (EL CAMINO REAL TO OCEANSIDE - LOAN)
CANNON ROAD WIDENING FROM I-5 TO PASEO DEL NORTE
CARLSBAD BOULEVARD ENCINAS CREEK BRIDGE RAILING
CARLSBAD BOULEVARD MEDIAN-TAMARACK AVENUE TO PINE AVENUE
CARLSBAD BOULEVARD PEDESTRIAN ACCESS STUDY
CARLSBAD BOULEVARD REALIGNMENT - PHASE I REIMBURSEMENT
CARLSBAD BOULEVARD RETROFIT OVER SDNR
CARLSBAD BOULEVARD WIDENING - CANNON TO MANZANO
CARLSBAD BOULEVARD U-TURN
CARLSBAD VILLAGE DRIVE WIDENING
CHESTNUT AVENUE WALL
COLLEGE BLVD EAST OF ECR/CANNON ROAD REACH 3
COLLEGE BLVD EAST OF ECR/CANNON ROAD REACH 3,4
COLLEGE BLVD/CANNON ROAD DISTRICT FORMATION (LOAN)
EL CAMINO REAL AND CAMINO VIDA ROBLE
EL CAMINO REAL AND CARLSBAD VILLAGE DRIVE
EL CAMINO REAL AND FARADAY AVENUE
EL CAMINO REAL AT AVIARA PARKWAY/ALGA ROAD
EL CAMINO REAL IMPROVEMENTS
EL CAMINO REAL MEDIANS
EL CAMINO REAL WIDENING - LA COSTA AVENUE TO ARENAL ROAD
EL CAMINO REAL WIDENING - TAMARACK AVENUE TO CHESTNUT AVE.
FARADAY AVENUE - ORION WAY TO MELROSE DRIVE (LOAN)
FARADAY AVENUE AND MELROSE DRIVE EXTENSIONS
FARADAY AVENUE MITIGATION - SOUTH OF CANNON
I-5 AND LA COSTA AVENUE AUXILIARY LANES
LA COSTA AVENUE SIDEWALKS
MELROSE DRIVE AND ALGA ROAD
OCEAN STREET IMPROVEMENTS
OLIVENHAIN ROAD WIDENING MITIGATION MONITORING
ORION STREET FROM ECR TO FARADAY
ORION STREET FROM ECR TO FARADAY
PALOMAR AIRPORT ROAD AND COLLEGE BOULEVARD
PALOMAR AIRPORT ROAD MITIGATION MAINTENANCE
PALOMAR AIRPORT ROAD WIDENING AND BRIDGE RECONSTRUCTION
PALOMAR AIRPORT ROAD WIDENING AT PASEO DEL NORTE
PAVEMENT MANAGEMENT PROGRAM
PAVEMENT MANAGEMENT PROGRAM
PAVEMENT MANAGEMENT PROGRAM
POINSETTIA LANE EAST OF EL CAMINO REAL FINANCING PROGRAM
POINSETTIA LANE RAILROAD BRIDGE WIDENING
POINSETTIA LANE WIDENING (PASEO DEL NORTE TO BATIQUITOS LN)
RANCHO SANTA FE ROAD AND OLIVENHAIN IMPROVEMENTS
RANCHO SANTA FE ROAD AND OLIVENHAIN IMPROVEMENTS
RANCHO SANTA FE ROAD NORTH - PHASE I
RANCHO SANTA FE ROAD NORTH - PHASE I
RANCHO SANTA FE ROAD NORTH - PHASE II (BRIDGE)
SIDEWALK/STREET CONSTRUCTION PROGRAM (35601,33911)
SIDEWALK/STREET CONSTRUCTION PROGRAM(3391 3,36081)
SIDEWALK/STREET CONSTRUCTION PROGRAM(33913,36081)
TRAFFIC IMPACT FEE STUDY
TRAFFIC MONITORING PROGRAM
UNDERGROUND DIST. 17 - HARDING, ROOSEVELT
SUBTOTAL STREET PROJECTS
FUND
TRANSNET-HWY
CFD#1
TIF
BTD#3
GCC
TIF
GCC
PFF
GCC
GAS TAX
TRANSNET-LOC
TIF
GAS TAX
TIF
GCC
OTHER
TRANSNET-HWY
GCC
TIF
TIF
TIF
TIF
TRANSNET-LOC
PFF
TIF
TIF
GAS TAX
OTHER
CFD#1
CFD#1
GCC
TIF
GAS TAX
CFD#2
GCC
COUNTY
TIF
ASMT DIST
PFF
TIF
TRANSNET-LOC
GAS TAX
ST GRANT
GCC
PFF
TIF
CFD#2
OTHER
CFD#1
CFDS2
FED GRNT
TIF
TDA
TRANSNET-LOC
TIF
TIF
GCC
TOTAL
BUDGET
4,660,000
6,534,600
1,160,000
7,050,000
100,000
210,725
17,900
1,253,449
105,000
1,830,000
1,100,000
2,000,000
75,000
1,260,000
103,875
12,195,000
1,761,000
505,421
400,000
320,000
710,000
250,000
3,200,000
1,850,000
450,000
2,024,708
255,610
14,790,854
130,000
1,500,000
150,000
480,000
170,000
15,000
772,908
500,000
160,000
280,000
7,200,000
480,000
19,849,348
15,731,088
814,065
100,000
2,131,358
1,870,000
2,638,691
1,151,000
5,700,000
21,882,900
5,821,600
6,538,804
270,300
603,557
70,000
1,364,764
509,800
186,494,253
PRIOR
EXP/ENC
4,356,387
6,534,600
788,847
4,755,465
14,284
58,395
16,272
1,499,437
387,632
23,740
14,986
338,651
229,401
156,366
95,105
32,570
93,937
119,885
209,853
790,854
63,258
26,429
746,505
500,000
158,818
4,930,625
117,475
560,556
40,000
2,104,592
7,103
7,857
8,391,910
715,384
131,451
603,037
67,559
655,665
47,412,215
C-28
DETAIL SCHEDULE OF CAPITAL PROJECTS BY CATEGORY
FISCAL YEARS 2002/2003 TO BUILD OUT
BALANCE
FORWARD
YEAR1
2002-2003
YEAR 2
2003-2004
YEAR 3
2004-2005
YEAR 4
2005-2006
YEARS
2006-2007
YEAR 6-10
2007-2012
BUILDOUT
2012 +
43,613
0
371,153
130,535
85,716
152,330
17,900
105,000
330,563
712,368
51,260
88,889
11,349
320,599
349,055
304,895
677,430
456,063
522,115
45,757
66,742
150,000
143,571
15,000
26,403
0
121,182
18,723
343,926
24,444
60,000
26,766
2,631,588
5,692,143
13,490,990
23,420
68,849
520
2,441
9,099
30,071,001
260,000
500,000 1,664,000
1,237,177
2,000,000
1,260,000
11,845,000
1,211,000
320,000
250,000
300,000 1,500,000 1,400,000
150,000 150,000 150,000 850,000
450,000
1,382,708
14,000,000
1,500,000
480,000
160,000
750,000 6,450,000
480,000
4,800,000 1,700,000 1,900,000 2,100,000 2,100,000 2,300,000
1,469,687 600,000 13,200,000
229,065
1,870,000
1,151,000
5,821,600
400,000 400,000 400,000 400,000 400,000 600,000 3,200,000
70,000
70,000 70,000 70,000 70,000 70,000 350,000
509,800
10,620,552 10,721,600 17,902,708 2,570,000 3,970,000 23,480,177 39,746,000
C-29
DETAIL SCHEDULE OF CAPITAL PROJECTS BY CATEGORY
FISCAL YEARS 2002/2003 TO BUILD OUT
PROJECT
JOB KEY PROJECT TITLE
LOAN REPAYMENTS
GOLF COURSE FUND TO GENERAL FUND
BTDS2 REPAYMENT TO GENERAL FUND
BTDS2 REPAYMENT TO GAS TAX FUND
BTD#3 CANNON ROAD WEST TO GAS TAX FUND
PIL-SW TO GF - POINSETTIA PARK LAND
PIL-NW TO GF FOR PINE SCHOOL ACQUISITION
PIL=NW TO GF FOR MADISON ST PROPERTY PURCHASES
PIL-SE TO GF FOR ALGA NORTE LAND ACQUISITION
SBA C,D,E,F TO SEW REPL FOR S AGUA HEDIONDA INTERCEPTOR
SBA H TO SEWER REPLACEMENT FOR LIFT STATION PUMP
COLLEGE/CANNON TO GF
FARADAY/MELROSE TO GF
RECYCLED WATER TO WATER REPLACEMENT
LOAN FROM WATER REPLACEMENT FUND
SUBTOTAL LOAN REPAYMENTS
GRAND TOTAL ALL FUNDED PROJECTS
FUND
GOLF COURSE
BTD#2
BTD#2
BTD#3
PIL-SW
PIL-NW
PIL-NW
PIL-SE
SEW BENEF
SEW BENEF
OTHER
OTHER
RECL WATER
WATER CONN
TOTAL PRIOR
BUDGET EXP/ENC
2,737,200
500,000
1,000,000
2,000,000
1,550,000
860,000
220,000
2,250,000
3,770,000
42,494
350,000
790,854
1,605,000
1,000,000
18,675,548 0
632,010,436 141,463,275
C-30
—, BALANCE
FORWARD
DETAIL SCHEDULE OF CAPITAL PROJECTS BY CATEGORY
FISCAL YEARS 2002/2003 TO BUILD OUT
YEAR1
2002-2003
YEAR 2
2003-2004
YEARS
2004-2005
YEAR 4
2005-2006
YEARS
2006-2007
YEAR 6-10
2007-2012
BUILDOUT
2012 +
0
137,213,712
2,737,200
500,000
1,000,000
2,000,000
1,000,000 550,000
860,000
220,000
1,000,000 1,250,000
3,770,000
42,494
350,000
790,854
1,605,000
1,000,000
2,605,000 - 2,340,854 1,080,000 1,000,000 2,000,000 9,649,694
37,971,744 39,365,265 41,684,484 34,530,327 7,346,502 82,927,594 109,507,533
C-31
C-32
CAPITAL IMPROVEMENT PROGRAM FUND SUMMARY
ASSESSMENT DISTRICTS
BEGINNING FUND BALANCE (1)
REVENUES
DEVELOPERS ASSESSMENTS
TOTAL REVENUES
CAPITAL PROJECTS
PALOMAR AIRPORT ROAD MITIGATION MAINTENANCE
* TRAP SIG - AVIARA PARKWAY-POINSETTIA LANE TO EL CAMINO REAL
TOTAL PROJECT EXPENDITURES
ENDING FUND BALANCE
PRIOR
YEARS
N/A
N/A
280,000
440,000
720,000
N/A
YEAR1
2002-2003
155,236
0
0
0
153,000
153,000
2,236
YEAR 2
2003-2004
2,236
0
0
0
0
0
2,236
YEAR 3
2004-2005
2,236
0
0
0
0
0
2,236
YEAR 4
2005-2006
2,236
0
0
0
0
0
2,236
YEARS
2006-2007
2,236
0
0
0
0
0
2,236
BUILDOUT
2007++
2,236
0
0
0
0
0
2,236
BTD NO. 2 AVIARA PARKWAY - POINSETTIA LANE
BEGINNING FUND BALANCE (1)
REVENUES
DEVELOPER FEES
TOTAL REVENUES
CAPITAL PROJECTS
BTD#2/AVIARA PKWY - PALOMAR AIRPORT RD TO COBBLESTONE RD
* BTD#2/POINSETTIA LANE - AVIARA PKWY TO BLACK RAIL ROAD
BTD#2/POINSETTIA LANE - REACH "C"
BTD#2/POINSETriA LANE - REACH ES "E,F,G"
BTD#2 REPAYMENT TO GAS TAX FUND
BTD#2 REPAYMENT TO GENERAL FUND
TOTAL PROJECT EXPENDITURES
ENDING FUND BALANCE
PRIOR
YEARS
N/A
N/A
507,500
3,810,000
1,000,000
550,000
0
0
5,867,500
N/A
YEAR1
2002-2003
3,215,141
1,620,700
1,620,700
0
0
0
0
0
0
0
4,835,841
YEAR 2
2003-2004
4,835,841
1,052,500
1,052,500
0
0
0
0
0
0
0
5,888,341
YEARS
2004-2005
5,888,341
1,432,045
1,432,045
0
0
0
0
0
0
0
7,320,386
YEAR 4
2005-2006
7,320,386
1,307,680
1,307,680
0
0
0
0
0
0
0
8,628,066
YEARS
2006-2007
8,628,066
667,690
667,690
0
0
0
0
0
0
0
9,295,756
BUILDOUT
2007++
9,295,756
3,831,079
3,831,079
1,104,000
3,288,000
1,291,000
5,437,000
1,000,000
500,000
12,620,000
506,835
BTD NO. 3 CANNON ROAD WEST
BEGINNING FUND BALANCE (1)
REVENUES
DEVELOPER FEES
TOTAL REVENUES
CAPITAL PROJECTS
* BTD#3 CANNON ROAD WEST TR SIGNAL ECR/CANNON
REPAY LOAN TO GAS TAX FUND
TOTAL PROJECT EXPENDITURES
ENDING FUND BALANCE
PRIOR
YEARS
N/A
N/A
4,886,000
0
4,886,000
N/A
YEAR1
2002-2003
1,383,143
135,252
135,252
0
0
0
1,518,395
YEAR 2
2003-2004
1,518,395
194,652
194,652
0
0
0
1,713,047
YEAR 3
2004-2005
1,713,047
142,560
142,560
0
0
0
1,855,607
YEAR 4
2005-2006
1,855,607
151,800
151,800
0
0
0
2,007,407
YEARS
2006-2007
2,007,407
86,856
86,856
0
0
0
2,094,263
BUILDOUT
2007++
2,094,263
3,198,360
3,198,360
2,164,000
2,000,000
4,164,000
1,128,623
(1) Equal to the projected fund balance less any continuing appropriations.
* Project has multiple funding sources.C-33
CAPITAL IMPROVEMENT PROGRAM FUND SUMMARY
COMMUNITY FACILITIES DISTRICT NO.
BEGINNING FUND BALANCE (1)
REVENUES
DEVELOPER SPECIAL TAXES
TOTAL REVENUES
CAPITAL PROJECTS
* BTD#3 CANNON ROAD WEST
CFD#1 ADMINISTRATION
CITY HALL
* COLE LIBRARY EXPANSION (35%)
FARADAY AVENUE MITIGATION - SOUTH OF CANNON
1-5 AND LA COSTA AVENUE AUXILLARY LANES
* PUBLIC WORKS CENTER
* RANCHO SANTA FE ROAD NORTH - PHASE I
* SOUTH CARLSBAD LIBRARY
VETERAN'S MEMORIAL PARK
TOTAL PROJECT EXPENDITURES
ENDING FUND BALANCE
1 (CFD 1)
PRIOR
YEARS
N/A
N/A
6,534,600
0
0
0
130,000
0
10,493,000
5,700,000
14,450,995
0
37,308,595
N/A
YEAR1
2002-2003
15,125,750
3,870,758
3,870,758
0
110,000
0
0
0
0
0
0
0
0
110,000
18,886,508
YEAR 2
2003-2004
18,886,508
5,825,992
5,825,992
0
110,000
0
0
0
0
0
0
0
0
110,000
24,602,500
YEAR 3
2004-2005
24,602,500
4,461,691
4,461,691
0
110,000
10,135,000
0
0
0
0
0
0
0
10,245,000
18,819,191
YEAR 4
2005-2006
18,819,191
4,292,275
4,292,275
0
110,000
10,135,000
0
0
0
0
0
0
0
10,245,000
12,866,466
YEARS
2006-2007
12,866,466
3,976,821
3,976,821
0
110,000
0
0
0
0
0
0
0
0
110,000
16,733,287
BUILDOUT
2007++
16,733,287
13,050,671
13,050,671
0
880,000
0
4,608,000
0
1,500,000
0
0
0
16,129,000
23,117,000
6,666,958
RANCHO SANTA FE ROAD PROJECT (CFD 2)
BEGINNING FUND BALANCE (1)
REVENUES
DEVELOPER SPECIAL TAXES
TOTAL REVENUES
CAPITAL PROJECTS
OUVENHAIN ROAD WIDENING MITIGATION MONITORING
* RANCHO SANTA FE ROAD AND OUVENHAIN IMPROVEMENTS
* RANCHO SANTA FE ROAD NORTH - PHASE I
TOTAL PROJECT EXPENDITURES
ENDING FUND BALANCE
PRIOR
YEARS
N/A
N/A
15,000
2,638,691
21,882,900
24,536,591
N/A
YEAR1
2002-2003
819,525
0
0
0
0
0
0
819,525
YEAR 2
2003-2004
819,525
33,026
33,026
0
0
0
0
852,551
YEAR 3
2004-2005
852,551
129,291
129,291
0
0
0
0
981,843
YEAR 4
2005-2006
981,843
0
0
0
0
0
0
981,843
YEARS
2006-2007
981,843
0
0
0
0
0
0
981,843
BUILDOUT
2007++
981,843
2,347,949
2,347,949
0
0
0
0
3,329t792
(1) Equal to the projected fund balance less any continuing appropriations.
* Project has multiple funding sources.
C-34
CAPITAL IMPROVEMENT PROGRAM FUND SUMMARY
GAS TAX FUND
BEGINNING FUND BALANCE (1)
REVENUES
DEVELOPER FEES
LOAN REPAYMENTS
TOTAL REVENUES
CAPITAL PROJECTS
ALGA RD STREET LIGHTING - AUCANTE ROAD TO EL FUERTE ST
CARLSBAD BOULEVARD REALIGNMENT - PHASE I REIMBURSEMENT
CARLSBAD BOULEVARD U-TURN
FARADAY AVENUE - ORION WAY TO MELROSE DRIVE (LOAN)
GAS TAX FUND TO BTD#3 CANNON ROAD WEST
GAS TAX LOAN BTD#2
* MISCELLANEOUS ROAD SUBDRAINS
OCEAN STREET IMPROVEMENTS
* PAVEMENT MANAGEMENT PROGRAM
* SOUTH CARLSBAD VILLAGE STORM DRAIN
TRAF SIG - ALGA ROAD AND CAZADERO
TRAF SIG - CARLSBAD BOULEVARD AND OAK AVENUE
TRAF SIG - CARLSBAD BOULEVARD AND STATE STREET
TRAF SIG - CARLSBAD VILLAGE DRIVE AND AVENIDA DE ANITA
TRAF SIG - CARLSBAD VILLAGE DRIVE TIMING UPGRADE
TRAF SIG - FARADAY AVENUE AND PRIESTLY DRIVE
TRAF SIG - PASEO DEL NORTE AND CAR COUNTRY DR
TRAF SIG - POINSETTIA LANE AND PASEO ESCUELA
TRAF SIG - POINSETTIA LANE AND SNAPDRAGON DR
TOTAL PROJECT EXPENDITURES
ENDING FUND BALANCE
PRIOR
YEARS
N/A
N/A
656,358
1,830,000
75,000
255,610
2,000,000
1,000,000
10,000
170,000
461,401
3,400,000
0
0
0
0
12,100
125,000
0
0
0
9,995,469
N/A
YEAR1
2002-2003
455,105
2,469,687
0
2,469,687
0
0
0
0
0
0
0
0
1,469,687
0
0
0
0
80,000
0
25,000
0
0
125,000
1,699,687
1,225,105
YEAR 2
2003-2004
1,225,105
1,650,000
0
1,650,000
0
0
0
0
0
0
0
0
600,000
0
0
0
0
0
0
0
0
150,000
0
750,000
2,125,105
YEAR 3
2004-2005
2,125,105
1,700,000
0
1,700,000
0
0
0
0
0
0
0
0
0
0
0
150,000
0
0
0
0
0
0
0
150,000
3,675,105
YEAR 4
2005-2006
3,675,105
1,750,000
0
1,750,000
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
5/425,105
YEARS
2006-2007
5/125,105
1,800,000
0
1,800,000
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
7,225,105
BUILDOUT
2007++
7,225,105
27,000,000
3,000,000
30,000,000
0
0
0
0
0
0
0
0
13,200,000
0
150,000
0
150,000
0
0
0
125,000
0
0
13,625,000
23,600,105
GENERAL CAPITAL CONSTRUCTION (GCC)
BEGINNING FUND BALANCE (1)
REVENUES
GENERAL FUND TRANSFER
TOTAL REVENUES
CAPITAL PROJECTS
ADA - CANNON PARK
ADA - MISCELLANEOUS FACILITY MODIFICATIONS
* ALGA ROAD MEDIANS
ASBESTOS SURVEY
CALAVERA HILLS CENTER - OFFICE EXPANSION
CANNON ROAD REACH 4 (EL CAMINO REAL TO OCEANSIDE - LOAN)
CARLSBAD BOULEVARD ENCINAS CREEK BRIDGE RAILING
CARLSBAD BOULEVARD PEDESTRIAN ACCESS STUDY
CHASE FIELD BATHROOM/SNACK BAR BLDG REPL
CHESTNUT AVENUE WALL
* COASTAL RAIL TRAIL - CORRIDOR ENHANCEMENT
COLLEGE BLVD/CANNON ROAD DISTRICT FORMATION (LOAN)
FIRE STATION #5 STORAGE BUILDING/RESTROOMS
GCC LOAN TO COLLEGE/CANNON
GCC LOAN TO FARADAY/MELROSE
GCC LOAN TO PIL-NW FOR MADISON ST PROPERTY PURCHASES
GCC LOAN TO PIL-NW FOR PINE SCHOOL ACQUISITION
GCC LOAN TO PIL-SE FOR ALGA NORTE LAND ACQUISITION
GENERAL FUND LOAN TO BTD#2
GENERAL FUND TO GOLF COURSE FUND
(continued on next page)
PRIOR
YEARS
N/A
N/A
48,000
600,000
70,000
40,000
25,000
100,000
17,900
105,000
190,000
103,875
0
505,421
216,600
350,000
790,854
220,000
860,000
2,250,000
500,000
2,737,200
YEAR 1 YEAR 2 YEAR 3 YEAR 4 YEAR 5 BUILDOUT
2002-2003 2003-2004 2004-2005 2005-2006 2006-2007 2007++
5,625,625 4,287,325 4,137,325 4,012,325 4,012,325 4,012,325
0
0
22,500
141,000
0
0
0
0
0
0
0
0
110,000
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
* Project has multiple funding sources.C-35
CAPITAL IMPROVEMENT PROGRAM FUND SUMMARY
CAPITAL PROJECTS
HARDING CENTER - KITCHEN REMODEL
HARDING CENTER - FANS
KRUGER HOUSE PRE-SCHOOL TOT LOT
LA COSTA AVENUE SIDEWALKS
MISCELLANEOUS BEACH ACCESS REPAIRS/UPGRADES
MISCELLANEOUS FACILITIES MAINTENANCE
* MISCELLANEOUS ROAD SUBDRAINS
* OPPORTUNISTIC SAND PROGRAM
* ORION STREET FROM ECR TO FARADAY
POINSETTIA COMMUNITY PARK - SOCCER FIELD STAIRS
POINSETTIA LANE EAST OF EL CAMINO REAL FINANCING PROGRAM
POINSETTIA PARK LAND (GENERAL FUND)
POLICE & FIRE CAD IMPLEMENTATION
POLICE & FIRE TRAINING FACILITY FEASIBILITY STUDY
POLICE TRAINING RANGE - RELOCATION
PUBLIC WORKS INVENTORY AND FAC MAINT PROGRAM
SAFETY CENTER - BUILDING IMPROVEMENTS
SAFETY CENTER - CONFERENCE CENTER REFURBISHMENT
SENIOR CENTER COURTYARD LANDSCAPING
SENIOR CENTER FLOOR REPLACEMENT
STAGECOACH PARK - TENNIS ACCESS WALKWAY
STAGECOACH PARK DRAIN (LOWER LEVEL)
TAMARACK AND SUNNYHILL DRAINAGE MODIFICATIONS
TORRFJON PLACE STORM DRAIN REUNING
TRAP SIG - ALGA ROAD AND XANA WAY
* TRAP SIG - AVIARA PARKWAY-POINSETTIA LANE TO EL CAMINO REAL
TRAP SIG - CALLE BARCELONA AND PASEO ALISO
TRAP SIG - CALLE BARCELONA AND PASEO AVELLANO
TRAP SIG - CARLSBAD BOULEVARD AND CHERRY AVE
TRAP SIG - CARLSBAD VILLAGE DR. AND CHATHAM RD.
TRAP SIG - CARLSBAD VILLAGE DRIVE AND PONTIAC
TRAP SIG - COLLEGE BOULEVARD AND TAMARACK
TRAP SIG - EL CAMINO REAL CORRIDOR STUDY
TRAP SIG - FARADAY AVE. AND CAMINO HILLS DRIVE
TRAP SIG - FARADAY AVENUE AND RUTHERFORD ROAD
TRAP SIG - LA COSTA AVENE AND CALLE MADERO
TRAP SIG - LA COSTA AVENUE/NUEVA CASTILLA
TRAP SIG - MONROE STREET AND HOSP WAY
TRAP SIG - POINSETTIA LANE AND BRIGANTINE ROAD
TRAP SIG - RANCHO SANTA FE ROAD AND QUESTHAVEN ROAD
TRAP SIG - TAMARACK AVE. AND PONTIAC DRIVE
TRAP SIG - TAMARACK AVE. AND VALLEY STREET
UNDERGROUND DIST. 17 - HARDING, ROOSEVELT
20,000
10,000
35,000
150,000
70,000
506,561
200,000
65,542
772,908
85,000
100,000
1,550,000
2,221,000
45,000
950,000
390,000
50,000
165,000
30,000
65,000
25,000
15,000
30,000
80,000
0
0
0
0
0
0
158,550
100,000
29,000
0
0
0
0
0
0
125,000
0
0
0
17,773,411
N/A
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
35,000
0
0
0
0
0
0
150,000
170,000
150,000
0
0
0
0
50,000
0
0
0
0
0
0
0
0
0
0
509,800
1,338,300
4,287,325
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
150,000
0
0
0
0
0
0
0
0
0
0
0
0
0
150,000
4,137,325
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
125,000
0
0
125,000
4,012,325
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
4,012,325
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
4,012,325
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
150,000
125,000
0
0
0
0
125,000
150,000
125,000
125,000
150,000
31,625
0
0
125,000
0
1,106,625
2,905,700
GOLF COURSE FUND
BEGINNING FUND BALANCE (1)
REVENUES
GOLF COURSE REVENUE
TOTAL REVENUES
CAPITAL PROJECTS
CARLSBAD MUNICIPAL GOLF COURSE
REPAY LOAN TO GENERAL FUND
TOTAL PROJECT EXPENDITURES
ENDING FUND BALANCE
PRIOR
YEARS
N/A
N/A
5,810,405
0
5,810,405
N/A
YEAR1
2002-2003
0
0
0
0
0
0
0
YEAR 2
2003-2004
0
0
0
0
0
0
0
YEAR 3
2004-2005
0
0
0
0
0
0
0
YEAR 4
2005-2006
0
0
0
Or
0
0
0
YEARS
2006-2007
0
0
0
0
0
0
0
BUILDOUT
2007++
0
2,737,200
2,737,200
0
2,737,200
2,737,200
0
(1) Equal to the projected fund balance less any continuing appropriations.
* Project has multiple funding sources.
C-36
CAPITAL IMPROVEMENT PROGRAM FUND SUMMARY
GRANTS - COUNTY
BEGINNING FUND BALANCE (1)
REVENUES
GRANT REVENUE (LOAN REIMBURSEMENT)
TOTAL REVENUES
CAPITAL PROJECTS
* ORION STREET FROM ECR TO FARADAY
TOTAL PROJECT EXPENDITURES
ENDING FUND BALANCE
PRIOR
YEARS
N/A
N/A
500,000
500,000
N/A
YEAR1
2002-2003
925,854
0
0
0
0
925,854
YEAR 2
2003-2004
925,854
0
0
0
0
925,854
YEAR 3
2004-2005
925,854
0
0
0
0
925,854
YEAR 4
2005-2006
925,854
0
0
0
0
925,854
YEARS
2006-2007
925,854
0
0
0
0
925,854
BUILDOUT
2007++
925,854
0
0
0
0
925,854
GRANTS - FEDERAL
PRIOR
YEARS
BEGINNING FUND BALANCE (1) N/A
REVENUES
HBBR GRANT REVENUE (RANCHO SANTA FE ROAD)
CMAQ & TEA GRANT REVENUE (RAIL TRAIL)
OTHER GRANT REVENUE
TOTAL REVENUES N/A
CAPITAL PROJECTS
* COASTAL RAIL TRAIL (CMAQ) -PROJECT STUDY REPORT 1,568,000
* RANCHO SANTA FE ROAD NORTH - PHASE II (BRIDGE) 0
TOTAL PROJECT EXPENDITURES 1,568,000
ENDING FUND BALANCE N/A
YEAR1
2002-2003
16,340
0
0
0
0
0
0
0
16,340
YEAR 2
2003-2004
16,340
5,821,600
0
0
5,821,600
0
5,821,600
5,821,600
16,340
YEAR 3
2004-2005
16,340
0
0
0
0
0
0
0
16,340
YEAR 4
2005-2006
16,340
0
0
0
0
0
0
0
16,340
YEARS
2006-2007
16,340
0
0
0
0
0
0
0
16,340
BUILDOUT
2007++
16,340
0
0
0
0
0
0
0
16,340
GRANTS - STATE
BEGINNING FUND BALANCE (1)
REVENUES
GRANT REVENUE
TOTAL REVENUES
CAPITAL PROJECTS
* OPPORTUNISTIC SAND PROGRAM
* PAVEMENT MANAGEMENT PROGRAM
TOTAL PROJECT EXPENDITURES
ENDING FUND BALANCE
PRIOR
YEARS
N/A
N/A
138,898
585,000
723,898
N/A
YEAR1
2002-2003
241,884
0
0
0
229,065
229,065
12,819
YEAR 2
2003-2004
12,819
0
0
0
0
0
12,819
YEAR 3
2004-2005
12,819
0
0
0
0
0
12,819
YEAR 4
2005-2006
12,819
0
0
0
0
0
12,819
YEARS
2006-2007
12,819
0
0
0
0
0
12,819
BUILDOUT
2007++
12,819
0
0
0
0
0
12,819
(1) Equal to the projected fund balance less any continuing appropriations.
* Project has multiple funding sources.C-37
CAPITAL IMPROVEMENT PROGRAM FUND SUMMARY
INFRASTRUCTURE MAINTENANCE & REPLACEMENT (IM&R)
BEGINNING FUND BALANCE (1)
REVENUES
GENERAL FUND TRANSFER
LICENSE TAX ON NEW CONSTRUCTION
TOTAL REVENUES
CAPITAL PROJECTS
* ALGA ROAD MEDIANS
BEACH ACCESS IMPROVEMENTS
CARLSBAD BLVD STORM DRAIN REPLACEMENT
HOLIDAY PARK - PLAYGROUND EQUIPMENT
HOLIDAY PARK - RESTROOM IMPROVEMENTS
LA COSTA AVENUE STORM DRAIN REPLACEMENT
* MISCELLANEOUS ROAD SUBDRAINS
POINSETTIA COMMUNITY PARK - SYNTHETIC SOCCER RELD
SENIOR CENTER - RECOAT ROOF
SWIM COMPLEX - FILTRATION/HEATING RENOVATIONS
TOTAL PROJECT EXPENDITURES
ENDING FUND BALANCE
PRIOR
YEARS
N/A
N/A
1,030,000
0
0
85,000
0
128,500
275,000
700,000
0
0
2,218,500
N/A
YEAR1
2002-2003
6,543,151
3,500,000
100,000
3,600,000
0
50,000
0
0
162,200
0
0
0
240,000
162,200
614,400
9,528,751
YEAR 2
2003-2004
9,528,751
3,666,322
100,000
3,766,322
0
0
80,000
0
0
0
0
0
0
0
80,000
13,215,073
YEAR 3
2004-2005
13,215,073
3,867,877
100,000
3,967,877
0
0
0
0
0
0
0
0
0
0
0
17,182,950
YEAR 4
2005-2006
17,182,950
4,038,191
100,000
4,138,191
0
0
0
0
0
0
0
0
0
0
0
21,321,141
YEARS
2006-2007
21,321,141
4,204,045
100,000
4,304,045
0
0
0
0
0
0
0
0
0
0
0
25,625,186
BUILDOUT
2007++
25,625,186
71,372,107
1,500,000
72,872,107
0
0
0
0
0
0
0
0
0
0
0
98,497,293
I
OTHER REVENUES
BEGINNING FUND BALANCE (1)
REVENUES
OTHER AGENCIES
DEVELOPER FUNDING
TOTAL REVENUES
CAPITAL PROJECTS
* COLLEGE BLVD EAST OF ECR/CANNON ROAD REACH 3
COLLEGE/CANNON TO GF
FARADAY AVENUE AND MELROSE DRIVE EXTENSIONS
FARADAY/MELROSE TO GF
* RANCHO SANTA FE ROAD AND OUVENHAIN IMPROVEMENTS
TOTAL PROJECT EXPENDITURES
ENDING FUND BALANCE
PRIOR
YEARS
N/A
N/A
350,000
0
790,854
0
0
1,140,854
N/A
YEAR1
2002-2003
730,021
1,151,000
0
1,151,000
0
0
0
0
1,151,000
1,151,000
730,021
YEAR 2
2003-2004
730,021
0
0
0
0
0
0
0
0
0
730,021
YEAR 3
2004-2005
730,021
0
15,000,000
15,000,000
0
0
14,000,000
790,854
0
14,790,854
939,167
YEAR 4
2005-2006
939,167
0
0
0
0
0
0
0
0
0
939,167
YEARS
2006-2007
939,167
0
0
0
0
0
0
0
0
0
939,167
BUILDOUT
2007++
939,167
0
11,845,000
11,845,000
11,845,000
350,000
0
0
0
12,195,000
589,167
PARK FEE ZONES 5,13,16
BEGINNING FUND BALANCE (1)
REVENUES
DEVELOPER FEES
TOTAL REVENUES
CAPITAL PROJECTS
BUSINESS PARK RECREATIONAL FACILITY
TOTAL PROJECT EXPENDITURES
ENDING FUND BALANCE
PRIOR
YEARS
N/A
N/A
13,000
13,000
N/A
YEAR1
2002-2003
719,782
141,794
141,794
5,000
5,000
856,576
YEAR 2
2003-2004
856,576
147,268
147,268
0
0
1,003,845
YEAR 3
2004-2005
1,003,845
159,017
159,017
0
0
1,162,862
YEAR 4
2005-2006
1,162,862
110,000
110,000
0
0
1,272,862
YEARS
2006-2007
1,272,862
170,000
170,000
0
0
1,442,862
BUILDOUT 1
2007++
1,442,862 '
1,603,495 1
1,603,495 1
2,626,000 1
2,626,000
420,356
(1) Equal to the projected fund balance less any continuing appropriations.
* Project has multiple funding sources.
C-38
CAPITAL IMPROVEMENT PROGRAM FUND SUMMARY
PARK-IN-LIEU NE
BEGINNING FUND BALANCE (1)
REVENUES
DEVELOPER FEES
TOTAL REVENUES
CAPITAL PROJECTS
LARWIN COMMUNITY PARK (22.3 ACRES)
PARK RESTORATION AND ACQUISITION
PARK SITE DEVELOPMENT (15 ACRES)
TOTAL PROJECT EXPENDITURES
ENDING FUND BALANCE
PRIOR
YEARS
N/A
N/A
550,000
0
0
550,000
N/A
YEAR1
2002-2003
956,221
342,211
342,211
670,000
0
0
670,000
628,432
YEAR 2
2003-2004
628,432
242,214
242,214
0
0
0
0
870,646
YEAR 3
2004-2005
870,646
642,201
642,201
0
0
0
0
1,512,848
YEAR 4
2005-2006
1,512,848
566,648
566,648
0
0
0
0
2,079,496
YEARS
2006-2007
2,079,496
555,538
555,538
0
0
0
0
2,635,034
BUILDOUT
2007++
2,635,034
4,879,841
4,879,841
0
4,500,000
3,000,000
7,500,000
14,875
PARK-IN-LIEU NW
BEGINNING FUND BALANCE (1)
REVENUES
DEVELOPER FEES
TOTAL REVENUES
CAPITAL PROJECTS
HOSP GROVE/BUENA VISTA LAGOON REC'L IMPROVEMENTS
PIL=NW TO GF FOR MADISON ST PROPERTY PURCHASES
PIL-NW TO GF FOR PINE SCHOOL ACQUISITION
TOTAL PROJECT EXPENDITURES
ENDING FUND BALANCE
PRIOR
YEARS
N/A
N/A
0
0
0
0
N/A
YEAR1
2002-2003
263,080
32,619
32,619
0
0
0
0
295,699
YEAR 2
2003-2004
295,699
284,678
284,678
0
0
0
0
580,378
YEAR 3
2004-2005
580,378
432,948
432,948
0
0
0
0
1,013,326
YEAR 4
2005-2006
1,013,326
530,807
530,807
0
220,000
860,000
1,080,000
464,133
YEARS
2006-2007
464,133
551,564
551,564
0
0
0
0
1,015,697
BUILDOUT
2007++
1,015,697
2,538,382
2,538,382
2,980,000
0
0
2,980,000
574,080
PARK-IN-LIEU SE
BEGINNING FUND BALANCE (1)
REVENUES
DEVELOPER FEES
TOTAL REVENUES
CAPITAL PROJECTS
ALGA NORTE LAND ACQUISITION
PIL-SE TO GF FOR ALGA NORTE LAND ACQUISITION
TOTAL PROJECT EXPENDITURES
ENDING FUND BALANCE
PRIOR
YEARS
N/A
N/A
4,800,000
0
4,800,000
N/A
YEAR1
2002-2003
211,414
86,664
86,664
0
0
0
298,078
YEAR 2
2003-2004
298,078
37,777
37,777
0
0
0
335,854
YEAR 3
2004-2005
335,854
259,992
259,992
0
0
0
595,846
YEAR 4
2005-2006
595,846
371,099
371,099
0
0
0
966,945
YEARS
2006-2007
966,945
371,099
371,099
0
1,000,000
1,000,000
338,044
BUILDOUT
2007++
338,044
679,978
679,978
0
1,250,000
1,250,OOO
(231,978)
PARK-IN-LIEU SW
BEGINNING FUND BALANCE (1)
REVENUES
DEVELOPER FEES
TOTAL REVENUES
CAPITAL PROJECTS
AVIARA REIMBURSEMENT AGREEMENT
PARK RESTORATION AND ACQUISITION
REPAYMENT TO GF - POINSETTIA PARK LAND
TOTAL PROJECT EXPENDITURES
ENDING FUND BALANCE
PRIOR
YEARS
N/A
N/A
238,000
0
0
238,000
N/A
YEAR1
2002-2003
1,421,790
8,889
8,889
0
0
1,000,000
1,000,000
430,679
YEAR 2
2003-2004
430,679
437,764
437,764
0
0
0
0
868,442
YEAR 3
2004-2005
868,442
479,984
479,984
0
0
550,000
550,000
798,427
YEAR 4
2005-2006
798,427
368,877
368,877
0
0
0
0
1,167,303
YEARS
2006-2007
1,167,303
217,771
217,771
0
0
0
0
1,385,074
BUILDOUT
2007++
1,385,074
1,314,959
1,314,959
0
2,700,000
0
2,700,000
33
(1) Equal to the projected fund balance less any continuing appropriations.
* Project has multiple funding sources.C-39
CAPITAL IMPROVEMENT PROGRAM FUND SUMMARY
PLANNED LOCAL DRAINAGE AREA FEES (PLDA)
BEGINNING FUND BALANCE (1)_
REVENUES
DEVELOPER FEES
TOTAL REVENUES
CAPITAL PROJECTS
AVIARA PARKWAY STORM DRAIN REIMBURSEMENT (PLDA "C")
COLLEGE BLVD/CANNON RD REACH 3 DRAINAGE FACILITIES
COLLEGE BOULEVARD STORM DRAIN (REIMB./PLDA "B")
DRAINAGE CHANNEL AND DESILTATION BASIN/CANNON RD (PLDA "B")
FARADAY/MELROSE DRAINAGE FAaLITIES (PLDA "B")
MASTER PLAN UPDATE
MISCELLANEOUS MASTER DRAINAGE FACILITIES
PARK DRIVE AND TAMARACK AVENUE STORM DRAIN (PLDA "B")
* SOUTH CARLSBAD VILLAGE STORM DRAIN (PLDA "B")
TAMARACK AND ECR STORM DRAIN AND SILT. BASIN (REIMB./PLDA "B")
TOTAL PROJECT EXPENDITURES
ENDING FUND BALANCE
PRIOR
YEARS
N/A
N/A
290,000
0
0
1,260,459
1,200,000
0
0
0
1,160,000
0
3,910,459
N/A
YEAR1
2002-2003
5,255,988
603,266
603,266
0
2,600,000
0
0
0
254,000
0
0
0
0
2,854,000
3,005,254
YEAR 2
2003-2004
3,005,254
1,163,185
1,163,185
0
0
0
0
0
0
0
0
0
0
0
4,168,438
YEAR 3
2004-2005
4,168,438
1,139,701
1,139,701
0
0
0
0
0
0
0
0
0
0
0
5,308,139
YEAR 4
2005-2006
5,308,139
1,185,487
1,185,487
0
0
0
0
0
0
0
0
0
0
0
6,493,626
YEARS
2006-2007
6,493,626
864,238
864,238
0
0
0
0
0
0
0
0
0
0
0
7,357,864
BUILDOUT
2007++
7,357,864
7,843,992
7,843,992
0
0
2,100,000
0
0
0
10,936,000
500,000
0
1,279,000
14,815,000
386,855
PUBLIC FACILITY FEE FUND (PFF)
BEGINNING FUND BALANCE (1)
REVENUES
DEVELOPER FEES
LAS PALMAS BUILDING LEASE REVENUE
TOTAL REVENUES
CAPITAL PROJECTS
ALGA NORTE PARK - PHASE I (30 ACRES)
ALGA NORTE PARK - PHASE H (50 METER POOL)
AVIARA COMMUNITY PARK (24.25 ACRES) *
* BTD#2/POINSETTTA LANE - AVIARA PKWY TO BLACK RAIL ROAD
CANNON LAKE PARK (6.7 ACRES)
CARLSBAD BOULEVARD MEDIAN-TAMARACK AVENUE TO PINE AVENUE
* COLE LIBRARY EXPANSION (65%)
EL CAMINO REAL MEDIANS
FIRE STATION # 3 RELOCATION
FIRE STATION #6 - (PERMANENT)
LEO CARRILLO PARK - PHASE I & II
LEO CARRILLO PARK - PHASE III
PALOMAR AIRPORT ROAD WIDENING AND BRIDGE RECONSTRUCTION
PARK SITE ACQUISITION (15 ACRES) NE QUADRANT PARK
PARK SITE DEVELOPMENT - PINE SCHOOL
POINSETTIA COMMUNITY PARK - PHASE H
POINSETTIA LANE RAILROAD BRIDGE WIDENING
* SOUTH CARLSBAD LIBRARY
TRAF SIG - CAMINO DE LOS COCHES AND LA COSTA AVENUE
TRAP SIG - CAMINO VIDA ROBLE AND YARROW DRIVE
TRAF SIG - CANNON ROAD AND AVENIDA ENdNAS
TRAF SIG - CANNON ROAD AND COLLEGE BOULEVARD
TRAF SIG - CARLSBAD BOULEVARD AND AVENIDA ENdNAS
TRAF SIG - COLLEGE BOULEVARD AND EL CAMINO REAL
TRAF SIG - COLLEGE BOULEVARD AND CARLSBAD VILLAGE DRIVE
TRAF SIG - COLLEGE BOULEVARD AND LAKE BOULEVARD/OCEANSIDE
TRAF SIG - EL CAMINO REAL AND POINSETTIA LANE
TRAF SIG - FARADAY AND CANNON ROAD
TRAF SIG - MELROSE DRIVE AND LA COSTA AVENUE
TRAF SIG - PALOMAR AIRPORT ROAD AND MELROSE DRIVE
TRAF SIG - POINSETTIA LANE AND EL FUERTE STREET
TRAF SIG - POINSETTIA LANE AND MELROSE DRIVE
TRAF SIG - RANCHO SANTA FE ROAD AND MELROSE DRIVE (SOUTH)
TRAF SIG - TAMARACK AVENUE AND GARFIELD STREET
TRAF SIG - TAMARACK AVENUE AND HIGHLAND DRIVE
TOTAL PROJECT EXPENDITURES
ENDING FUND BALANCE
PRIOR
YEARS
N/A
N/A
250,000
0
10,997,890
1,822,070
0
16,272
0
550,000
0
0
5,568,000
0
0
4,550,000
700,000
0
2,131,358
396,417
0
0
0
0
0
0
0
0
204,250
125,000
0
125,000
0
119,676
0
0
0
27,555,933
N/A
YEAR1
2002-2003
9,886,005
3,085,662
312,252
3,397,914
700,000
0
1,000,000
0
0
0
0
150,000
0
25,000
0
0
0
0
900,000
0
0
0
0
0
150,000
0
0
0
0
0
0
0
0
125,000
0
0
0
0
0
3,050,000
10,233,919
YEAR 2
2003-2004
10,233,919
5,089,060
324,742
5,413,802
7,300,000
0
0
0
0
0
0
150,000
0
0
0
0
0
0
5,296,000
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
12,746,000
2,901,721
YEAR 3
2004-2005
2,901,721
4,709,251
337,732
5,046,983
0
0
0
0
0
0
0
150,000
0
1,000,000
0
0
0
0
0
600,000
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
1,750,000
6,198,704
YEAR 4
2005-2006
6,198,704
4,578,581
351,241
4,929,822
0
0
0
0
0
0
0
0
895,000
0
0
0
0
0
0
6,600,000
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
7,495,000
3,633,526
YEARS
2006-2007
3,633,526
4,483,470
365,291
4,848,761
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
8,482,287
BUILDOUT
2007++
8,482,287
16,195,729
5,657,676
21,853,405
0
5,936,000
0
0
947,000
1,237,177
8,320,000
850,000
0
0
0
1,703,000
7,200,000
0
0
0
0
0
150,000
125,000
0
150,000
110,000
115,000
110,000
100,000
0
0
150,000
0
150,000
125,000
150,000
150,000
150,000
27,928,177
2,407,515
(1) Equal to the projected fund balance less any continuing appropriations.
* Project has multiple funding sources.C-40
CAPITAL IMPROVEMENT PROGRAM FUND SUMMARY
REDEVELOPMENT BONDS
BEGINNING FUND BALANCE (1)
REVENUES
BOND PROCEEDS
TOTAL REVENUES
CAPITAL PROJECTS
DOWNTOWN STREET LIGHTING ENHANCEMENT STUDY
VILLAGE AREA STREET FURNITURE AND PLANTERS
VILLAGE PUBLIC PARKING ENHANCEMENT PROGRAM
VILLAGE PUBLIC RELATIONS CAMPAIGN
TOTAL PROJECT EXPENDITURES
ENDING FUND BALANCE
PRIOR
YEARS
N/A
N/A
65,000
75,000
495,215
30,000
665,215
N/A
YEAR1 YEAR 2 YEARS YEAR 4 YEAR 5 BUILDOUT
2002-2003 2003-2004 2004-2005 2005-2006 2006-2007 2007++
304,128
0
0
0
20,000
264,000
20,000
304,000
128
128
0
0
0
0
0
0
0
128
128
0
0
0
0
0
0
0
128
128
0
0
0
0
0
0
0
128
128
0
0
0
0
0
0
0
128
128
0
0
0
0
0
0
0
128
SEWER BENEFIT AREA FEES (SBA)
BEGINNING FUND BALANCE (1)
REVENUES
DEVELOPER FEES
TOTAL REVENUES
CAPITAL PROJECTS
CARLSBAD TRUNK SEWER REACHES VCT1A, VCT1B, VCT1C (SBA "A")
SBA C,D,E,F TO SEW REPL FOR S AGUA HEDIONDA INTERCEPTOR
SBA H TO SEWER REPLACEMENT FOR LIFT STATION PUMP
SOUTH AGUA HEDIONDA LIFT STATION AND FORCE MAIN
TOTAL PROJECT EXPENDITURES
ENDING FUND BALANCE
PRIOR
YEARS
N/A
N/A
0
0
0
4,395,494
4,395,494
N/A
YEAR1
2002-2003
2,383,851
400,000
400,000
0
0
0
0
0
2,783,851
YEAR 2
2003-2004
2,783,851
400,000
400,000
0
0
0
0
0
3,183,851
YEAR 3
2004-2005
3,183,851
400,000
400,000
100,000
0
0
0
100,000
3,483,851
YEAR 4
2005-2006
3,483,851
400,000
400,000
355,000
0
0
0
355,000
3,528,851
YEARS
2006-2007
3,528,851
400,000
400,000
0
0
0
0
0
3,928,851
BUILDOUT
2007++
3,928,851
10,900,000
10,900,000
0
3,770,000
42,494
3,266,000
7,078,494
7,750,357
SEWER CONNECTION FEE FUND
BEGINNING FUND BALANCE (1)
REVENUES
DEVELOPER FEES
OTHER AGENCY CONTRIBUTIONS
TOTAL REVENUES
CAPITAL PROJECTS
BUENA VISTA LIFT STATION
BUENA VISTA LIFT STATION PUMP ADDITION
BUILDING IMPROVEMENTS
CAPITAL ACQUISITIONS - UNIT I
FLOW EQUALIZATION PROJECT
NIGHTSHADE GRAVITY SEWER EXTENSION
PHASE IV EXPANSION - DEBT SERVICE
PHASE V EXPANSION
PHASE V EXPANSION - INTERIM CAPACITY
SEWER CONNECTION FEE UPDATE
* SEWER MASTER PLAN UPDATE
SEWER MONITORING PROGRAM
TECHNOLOGY MASTER PLAN
VISTA/CARLSBAD INTERCEPTOR AGUA HEDIONDA LIFT STATION (VC12
VISTA/CARLSBAD INTERCEPTOR REACH VC11B
VISTA/CARLSBAD INTERCEPTOR REACH VC13 TO VC15
* VISTA/CARLSBAD INTERCEPTOR REACH VC5A, 5B TO VC11A
TOTAL PROJECT EXPENDITURES
ENDING FUND BALANCE
PRIOR
YEARS
N/A
N/A
502,132
0
693,314
624,444
2,775,530
0
0
789,859
222,297
15,000
205,698
207,138
341,220
350,000
300,000
0
12,223,433
19,250,065
YEAR1
2002-2003
22,558,037
777,500
1,200,000
1,977,500
0
0
1,093,935
124,050
2,542,735
0
942,161
0
0
0
0
0
0
0
2,600,000
0
0
7,302,881
N/A 17,232,656
YEAR 2
2003-2004
17,232,656
1,421,112
500,000
1,921,112
0
0
0
124,050
0
0
936,199
7,467,810
0
0
0
20,000
0
0
0
500,000
0
9,048,059
10,105,709
YEAR 3
2004-2005
10,105,709
2,319,330
3,600,000
5,919,330
0
0
0
124,050
0
50,000
936,256
0
0
0
0
20,000
0
769,360
0
4,700,000
0
6,599,666
9,425,373
YEAR 4
2005-2006
9/425,373
2,182,217
4,600,000
6,782,217
0
0
0
124,050
0
100,000
939,581
0
0
0
0
20,000
0
5,130,640
0
5,000,000
0
11,314,271
4,893,319
YEARS
2006-2007
4,893,319
1,983,140
0
1,983,140
0
0
0
124,050
0
0
936,394
0
0
0
0
20,000
0
0
0
0
0
1,080,444
5,796,015
BUILDOUT
2007++
5,796,015
15,652,230
0
15,652,230
0
233,000
0
2,170,343
2,870,987
0
8,391,592
3,435,093
0
0
0
300,000
819,722
0
0
0
0
18,220,737
3,227,508
(1) Equal to the projected fund balance less any continuing appropriations.
* Project has multiple funding sources.C-41
CAPITAL IMPROVEMENT PROGRAM FUND SUMMARY
SEWER REPLACEMENT FUND
BEGINNING FUND BALANCE (1)
REVENUES
TRANSFER FROM OPERATING FUND
LOAN REPAYMENTS
TOTAL REVENUES
CAPITAL PROJECTS
AVENIDA ENCINAS GRAVITY SEWER
CAPITAL PLANNING /SERVICES
CHINQUAPIN LIFT STATION
COGENERATION REHABILITATION
EL CAMINO REAL SEWER - CHESTNUT TO TAMARACK
FARADAY AVENUE - ORION TO MELROSE SEWER
FOREST GRAVITY SEWER
FOXES SEWAGE LIFT STATION UPGRADE
HOME PLANT LIFT STATION
LA COSTA MEADOWS SEWER EXTENSION
LA GOLONDRIA SEWER EXTENSION
NORTH AGUA HEDIONDA INTERCEPTOR REHAB - EL CAM. REAL/KELLY
NORTH AGUA HEDIONDA INTERCEPTOR REHABILITATION
NORTH AGUA HEDIONDA TRUNK SEWER REACH NAHT1A
NORTH BATIQUTTOS INTERCEPTOR REHABILITATION
NORTH BATIQUITOS SEWAGE LIFT STATION MODIFICATIONS
PALMER WAY SEWER EXTENSION
PLANT REHABILITATION
POINSETTIA LANE SEWER RELOCATION
POINSETTIA SEWAGE LIFT STATION ODOR/NOISE ABATEMENT
* PUBLIC WORKS CENTER
PUMP STATION INTERFACES
SEWER ACCESS HOLE REHABILITATION
SEWER LIFT STATION REPAIRS AND UPGRADES
SEWER LINE REFUR8ISHMENTS/REPLACEMENT
* SEWER MASTER PLAN UPDATE
SEWER REPL TO SEW BENEF FOR LIFT STATION PUMP
SEWER REPL TO SEW BENEF FOR S AGUA HEDIONDA INTERCEPTOR
* VISTA/CARLSBAD INTERCEPTOR REACH VC5A, 5B TO VC11A
VISTA/CARLSBAD INTERCEPTOR REHAB REACHES 1 THROUGH 3
TOTAL PROJECT EXPENDITURES
ENDING FUND BALANCE
PRIOR
YEARS
N/A
N/A
0
502,969
450,000
0
420,000
110,200
300,000
2,185,000
0
0
0
0
750,000
0
400,000
34,800
125,000
1,345,493
400,000
0
2,200,000
42,649
900,000
235,380
1,868,182
98,792
42,494
3,770,000
702,020
327,075
17,210,054
N/A
YEAR1
2002-2003
7,787,153
1,400,000
0
1,400,000
175,000
112,099
0
0
0
0
500,000
0
35,000
0
0
620,000
837,600
0
0
297,200
0
66,987
0
21,700
0
17,013
100,000
0
300,000
0
0
0
0
50,000
3,132,599
6,054,554
YEAR 2
2003-2004
6,054,554
1,400,000
0
1,400,000
0
112,099
0
0
0
0
0
0
250,000
0
0
0
0
158,000
600,000
0
0
74,430
0
200,100
0
0
100,000
0
300,000
0
0
0
0
0
1,794,629
5,659,925
YEAR 3
2004-2005
5,659,925
1,400,000
0
1,400,000
0
112,099
0
0
0
0
0
0
0
50,000
50,000
0
0
1,375,200
0
0
0
74,430
0
0
0
0
100,000
0
300,000
0
0
0
0
0
2,061,729
4,998,196
YEAR 4
2005-2006
4,998,196
1,400,000
0
1,400,000
0
112,099
0
0
0
0
0
0
0
125,000
100,000
0
0
0
0
0
0
74,430
0
0
0
0
100,000
0
300,000
0
0
0
0
0
811,529
5,586,667
YEARS
2006-2007
5,586,667
1,400,000
0
1,400,000
0
52,101
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
74,430
0
0
0
0
100,000
0
300,000
0
0
0
0
0
526,531
6,460,136
BUILDOUT
2007++
6,460,136
6,000,000
3,812,494
9,812,494
0
906,557
0
581,447
0
0
0
0
0
0
0
0
0
0
0
0
0
1,198,323
0
0
0
0
1,400,000
0
4,500,000
0
0
0
0
0
8,586,327
7,686,303
TDA - LOCAL TRANSPORTATION FUNDS
BEGINNING FUND BALANCE (1)
REVENUES
TDA GRANT
TOTAL REVENUES
CAPITAL PROJECTS
* SIDEWALK/STREET CONSTRUCTION PROGRAM(33913,36081)
TOTAL PROJECT EXPENDITURES
ENDING FUND BALANCE
PRIOR
YEARS
N/A
N/A
200,300
200,300
N/A
YEAR1
2002-2003
1,469
70,000
70,000
70,000
70,000
1,469
YEAR 2
2003-2004
1,469
0
0
0
0
1,469
YEAR 3
2004-2005
1/469
0
0
0
0
1,469
YEAR 4
2005-2006
1,469
0
0
0
0
1/469
YEARS
2006-2007
1/469
0
0
0
0
1,469
BUILDOUT
2007++
1,469
0
0
0
0
1,469
(1) Equal to the projected fund balance less any continuing appropriations.
* Project has multiple funding sources.C-42
CAPITAL IMPROVEMENT PROGRAM FUND SUMMARY
TRAFFIC IMPACT FEES (TIF)
BEGINNING FUND BALANCE (1)
REVENUES
DEVELOPER FEES
MISC. REIMBURSEMENTS
TOTAL REVENUES
CAPITAL PROJECTS
AVENIDA ENCINAS WIDENING - SOUTH OF PALOMAR AIRPORT ROAD
* BTD#3 CANNON ROAD WEST
CANNON ROAD WIDENING FROM 1-5 TO PASEO DEL NORTE
CARLSBAD BOULEVARD WIDENING - CANNON TO MANZANO
CARLSBAD VILLAGE DRIVE WIDENING
EL CAMINO REAL AND CAMINO VIDA ROBLE
EL CAMINO REAL AND CARLSBAD VILLAGE DRIVE
EL CAMINO REAL AND FARADAY AVENUE
EL CAMINO REAL AT AVIARA PARKWAY/ALGA ROAD
EL CAMINO REAL WIDENING - LA COSTA AVENUE TO ARENAL ROAD
EL CAMINO REAL WIDENING - TAMARACK AVENUE TO CHESTNUT AVE.
MELROSE DRIVE AND ALGA ROAD
PALOMAR AIRPORT ROAD AND COLLEGE BOULEVARD
PALOMAR AIRPORT ROAD WIDENING AT PASEO DEL NORTE
POINSETTIA LANE WIDENING (PASEO DEL NORTE TO BATIQUITOS LN
* SIDEWALK/STREET CONSTRUCTION PROGRAM (35601,33911)
* TRAP SIG - AVIARA PARKWAY-POINSETTIA LANE TO EL CAMINO REAL
TRAF SIG - FARADAY AVENUE AND ORION STREET
TRAFFIC IMPACT FEE STUDY
TRAFFIC MONITORING PROGRAM
TOTAL PROJECT EXPENDITURES
ENDING FUND BALANCE
PRIOR
YEARS
N/A
N/A
0
1,160,000
210,725
0
0
400,000
0
710,000
0
0
642,000
0
0
0
0
738,804
30,000
0
70,000
664,764
4,626,293
N/A
YEAR1
2002-2003
4,223,039
929,395
0
929,395
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
400,000
0
0
0
70,000
470,000
4,682,434
YEAR 2
2003-2004
4,682,434
1,296,599
0
1,296,599
0
0
0
0
0
0
0
0
0
0
0
0
0
480,000
0
400,000
0
0
0
70,000
950,000
5,029,033
YEAR 3
2004-2005
5,029,033
1,332,643
0
1,332,643
0
0
0
0
0
0
0
0
0
0
1,382,708
0
0
0
0
400,000
0
0
0
70,000
1,852,708
4,508,968
YEAR 4
2005-2006
4,508,968
1,269,317
0
1,269,317
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
400,000
0
0
0
70,000
470,000
5,308,285
YEARS
2006-2007
5,308,285
1,220,767
0
1,220,767
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
400,000
0
0
0
70,000
470,000
6,059,051
BUILDOUT
2007++
6,059,051
9,596,594
357,000
9,953,594
870,000
0
0
2,000,000
1,260,000
0
320,000
0
250,000
450,000
0
480,000
160,000
0
1,870,000
3,800,000
0
150,000
0
350,000
11,960,000
4,052,645
TRANSNET/BICYCLE
BEGINNING FUND BALANCE (1)
REVENUES
TRANSNET REVENUE
TOTAL REVENUES
CAPITAL PROJECTS
* COASTAL RAIL TRAIL
TOTAL PROJECT EXPENDITURES
ENDING FUND BALANCE
PRIOR
YEARS
N/A
N/A
200,000
200,000
N/A
YEAR1 YEAR 2 YEAR 3 YEAR 4 YEARS BUILDOUT
2002-2003 2003-2004 2004-2005 2005-2006 2006-2007 2007++
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
TRANSNET/HIGHWAY
BEGINNING FUND BALANCE (1)
REVENUES
TRANSNET REVENUE
TOTAL REVENUES
CAPITAL PROJECTS
* BTD#3 CANNON ROAD WEST
* COLLEGE BLVD EAST OF ECR/CANNON ROAD REACH 3,4
TOTAL PROJECT EXPENDITURES
ENDING FUND BALANCE
PRIOR
YEARS
N/A
N/A
4,400,000
550,000
4,950,000
N/A
YEAR1
2002-2003
335,312
1,211,000
1,211,000
260,000
1,211,000
1,471,000
75,312
YEAR 2
2003-2004
75,312
0
0
0
0
0
75,312
YEAR 3
2004-2005
75,312
0
0
0
0
0
75,312
YEAR 4
2005-2006
75,312
0
0
0
0
0
75,312
YEARS
2006-2007
75,312
0
0
0
0
0
75,312
BUILDOUT
2007++
75,312
0
0
0
0
0
75,312
(1) Equal to the projected fund balance less any continuing appropriations.
* Project has multiple funding sources.C-43
CAPITAL IMPROVEMENT PROGRAM FUND SUMMARY
TRANSNET-LOCAL
BEGINNING FUND BALANCE (1)
REVENUES
TRANSPORTATION TAXES
TOTAL REVENUES
CAPITAL PROJECTS
CARLSBAD BOULEVARD RETROFIT OVER SDNR
EL CAMINO REAL IMPROVEMENTS
* PAVEMENT MANAGEMENT PROGRAM
* SIDEWALK/STREET CONSTRUCTION PROGRAM(33913,36081)
* SOUTH CARLSBAD VILLAGE STORM DRAIN
TRAP SIG - EL CAM. REAL/PLAZA/MARRON/HOSP WY
VISTA/CARLSBAD INTERCEPTOR - PAVEMENT OVERLAY
TOTAL PROJECT EXPENDITURES
ENDING FUND BALANCE
PRIOR
YEARS
N/A
N/A
1,100,000
-
4,949,348
603,557
4,700,000
-
695,880
12,048,785
N/A
YEAR1
2002-2003
1,769,213
4,600,000
4,600,000
0
300,000
4,800,000
0
0
1,200,000
0
6,300,000
69,213
YEAR 2
2003-2004
69,213
3,200,000
3,200,000
0
1,500,000
1,700,000
0
0
0
0
3,200,000
69,213
YEAR 3
2004-2005
69,213
1,900,000
1,900,000
0
0
1,900,000
0
0
0
0
1,900,000
69,213
YEAR 4
2005-2006
69,213
2,100,000
2,100,000
0
0
2,100,000
0
0
0
0
2,100,000
69,213
YEARS
2006-2007
69,213
3,500,000
3,500,000
0
1,400,000
2,100,000
0
0
0
0
3,500,000
69,213
BUILDOUT
2007++
69,213
2,300,000
2,300,000
0
0
2,300,000
0
0
0
0
2,300,000
69,213
TRANSNET - SURFACE TRANSPORTATION
BEGINNING FUND BALANCE (1)
REVENUES
STP REVENUE
TOTAL REVENUES
CAPITAL PROJECTS
* SOUTH CARLSBAD VILLAGE STORM DRAIN
TOTAL PROJECT EXPENDITURES
ENDING FUND BALANCE
PROGRAM (STP)
PRIOR
YEARS
N/A
N/A
1,240,000
1,240,000
N/A
YEAR1
2002-2003
321,751
0
0
0
0
321,751
YEAR 2
2003-2004
321,751
0
0
0
0
321,751
YEAR 3
2004-2005
321,751
0
0
0
0
321,751
YEAR 4
2005-2006
321,751
0
0
0
0
321,751
YEARS
2006-2007
321,751
0
0
0
0
321,751
BUILDOUT
2007++
321,751
0
0
0
0
321,751
(1) Equal to the projected fund balance less any continuing appropriations.
* Project has multiple funding sources.
C-44
CAPITAL IMPROVEMENT PROGRAM FUND SUMMARY
WATER - MAJOR FACILITY FEE FUND
BEGINNING FUND BALANCE (1)
REVENUES
DEVELOPER FEES
TOTAL REVENUES
CAPITAL PROJECTS
* "D" RESERVOIR - PHASE II
580 ZONE SECONDARY SUPPLY
680 ZONE SUPPLY
AVIARA PARKWAY- POINSETTIA LANE TO PALOMAR AIRPORT ROAD
CALAVERA HILLS WATER BOOSTER STATION STANDBY GENERATOR
CANNON ROAD WEST TRANSMISSION MAIN
* CARLSBAD BOULEVARD - MANZANO DRIVE TO AVENIDA ENdNAS
COLLEGE BOULEVARD - CANNON ROAD TO CARLSBAD VILLAGE DRIVE
COLLEGE BOULEVARD - EL CAMINO REAL TO AGUA HEDIONDA CREEK
COLLEGE BOULEVARD (33" LINE TO CANNON ROAD)
EL CAMINO REAL CROSSING AT KELLY DRIVE
EL CAMINO REAL TRANSMISSION MAIN - USA STREET TO KELLY DRIV
EL CAMINO REAL TRANSMISSION MAIN FROM CASSIA TO POINSETTIA
ELFUERTE - NORTH OF LOKER
EL FUERTE - ALGA ROAD TO POINSETTIA LANE
EL FUERTE - FARADAY TO MAERKLE RESERVOIR
EL FUERTE - POINSETTIA LANE TO PALOMAR AIRPORT ROAD
FARADAY AVENUE - ORION TO MELOROSE WATERUNE
INTERSTATE 5 CROSSING
LOAN FROM WATER REPLACEMENT FUND
NORTH AGUA HEDIONDA TRANSMISSION MAIN
PALOMAR AIRPORT - NORTH OF OWENS
POINSETTIA LANE - EL CAMINO REAL TO "D" RESERVOIR
POINSETTIA LANE - EL FUERTE TO EL CAMINO REAL
POINSETTIA LANE - PASEO DEL NORTE TO CARLSBAD BOULEVARD
POINSETTIA LANE- FROM "D" RESERVOIR TO AMBROSIA LANE
PRESSURE REGULATING STATION - CANNON ROAD AND COLLEGE BLV
RANCHO CARRILLO OVERSIZING/EXTENSION
TAP NO. 2 RESERVOIR
* WATER CERTIFICATE OF PARTICIPATION (COP) PAYMENTS (84%)
* WATER/SEWER MASTER PLAN UPDATE
TOTAL PROJECT EXPENDITURES
ENDING FUND BALANCE
PRIOR
YEARS
N/A
N/A
0
0
0
0
0
2,864,457
0
50,000
183,375
0
0
50,000
0
0
2,000,000
25,000
0
97,210
982,000
0
0
150,000
2,700,000
0
375,000
322,000
0
90,000
150,000
0
31,145
10,070,187
N/A
YEAR1
2002-2003
5,156,004
817,740
817,740
0
0
0
0
0
0
0
500,000
51,625
0
0
0
835,800
0
0
0
0
0
0
0
0
0
0
0
0
0
250,000
0
0
1,024,682
0
2,662,107
3,311,637
YEAR 2
2003-2004
3,311,637
1,704,731
1,704,731
0
0
0
495,000
50,000
0
0
0
0
421,000
94,000
200,000
0
148,750
0
0
820,000
0
0
0
30,000
0
0
0
0
0
0
0
0
1,030,428
0
3,289,178
1,727,190
YEAR 3
2004-2005
1,727,190
2,803,311
2,803,311
0
0
0
0
200,000
0
0
0
0
0
0
0
0
0
0
0
0
0
0
1,000,000
100,000
0
0
0
0
0
0
0
0
0
0
1,300,000
3,230,501
YEAR 4
2005-2006
3,230,501
2,530,897
2,530,897
0
0
0
0
0
0
0
p
b
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
100,000
0
0
100,000
5,661,398
YEARS
2006-2007
5,661,398
2,530,173
2,530,173
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
100,000
0
0
100,000
8,091,572
BUILDOUT
2007++
8,091,572
8,715,041
8,715,041
3,984,500
256,000
550,000
0
0
0
133,000
0
0
0
0
0
0
0
0
305,000
0
0
0
0
0
0
0
2,800,000
0
0
0
0
1,400,000
0
0
9/428,500
7,378,112
WATER - RECYCLED WATER FUND
BEGINNING FUND BALANCE (1)
REVENUES
TRANSFER FROM OPERATING FUND
LOANS & OTHER
TOTAL REVENUES
CAPITAL PROJECTS
DEBT SERVICE ON STATE LOAN
1-5 RECYCLED WATER TRANSMISSION LINE
INDUSTRIAL PARK SYSTEM
PUMP STATION UPGRADE
RECYCLED LINE - POINSETTIA BRIDGE
* RECYCLED WATER PH II
* RECYCLED WATER PH II - FLOW EQUALIZATION
* RECYCLED WATER PH II - PIPELINES
* RECYCLED WATER PH II - PUMP STATIONS
* RECYCLED WATER PH II - TREATMENT FACILITY
RECYCLED WATER TO WATER REPLACEMENT
TOTAL PROJECT EXPENDITURES
ENDING FUND BALANCE
PRIOR
YEARS
N/A
N/A
0
140,000
1,179,539
0
240,000
600,000
2,970,000
15,800,000
2,600,000
12,500,000
0
36,029,539
N/A
YEAR1
2002-2003
2,902,056
160,000
0
160,000
159,527
0
0
0
0
0
0
0
0
360,000
1,605,000
2,124,527
937,529
YEAR 2
2003-2004
937,529
160,000
0
160,000
159,527
0
0
400,000
0
0
0
0
0
0
0
559,527
538,002
YEAR 3
2004-2005
538,002
160,000
0
160,000
159,527
0
0
0
0
0
0
0
0
0
0
159,527
538,475
YEAR 4
2005-2006
538,475
160,000
0
160,000
159,527
0
0
0
0
0
0
0
0
0
0
159,527
538,948
YEARS
2006-2007
538,948
160,000
0
160,000
159,527
0
0
0
0
0
0
0
0
0
0
159,527
539,421
BUILDOUT
2007++
539,421
1,120,000
0
1,120,000
1,083,067
0
0
0
0
0
0
0
0
0
0
1,083,067
576,354
(1) Equal to the projected fund balance less any continuing appropriations.
* Project has multiple funding sources.C-45
CAPITAL IMPROVEMENT PROGRAM FUND SUMMARY
WATER REPLACEMENT FUND
BEGINNING FUND BALANCE (1)
REVENUES
TRANSFER FROM OPERATING FUND
LOAN REPAYMENTS
TOTAL REVENUES
CAPITAL PROJECTS
* "D" RESERVOIR - PHASE II
* CARLSBAD BOULEVARD - MANZANO DRIVE TO AVENIDA ENCINAS
COLLEGE BLVD - MAERKLE RESERVOIR TO AGUA HEDIONDA CREEK
EL CAMINO REAL - PALOMAR AIRPORT ROAD SOUTH
EL CAMINO REAL TRANSMISSION MAIN FROM FARADAY TO COUGAR DR
FOUSSAT ROAD WELL ABANDONMENT
IND'L PARK SYSTEM - LOAN TO RECYCLED WATER
LAKE CALAVERA RESERVOIR IMPROVEMENTS
LOAN TO WATER CONNECTION FUND
MARRON ROAD - PRESSURE REGULATING STATION TO OCEANSIDE
MISCELLANEOUS PIPELINE REPLACEMENT PROJECTS
MISCELLANEOUS STORAGE TANK REPAIRS
MISCELLANEOUS WATER RESERVOIR FENCING
OCEANSIDE INTERTIE UPGRADE
* PUBLIC WORKS CENTER
* RECYCLED WATER PROG-PHASE II
SEAWATER DESALINATION PROGRAMS
TANGLEWOOD PRESSURE REDUCING STATION REPLACEMENT
TAP RESERVOIR EXTERIOR PAINTING
TRI-AGENCY PIPELINE EROSION PROTECTION
* WATER CERTIFICATE OF PARTICIPATION (COP) PAYMENTS (16%)
WATER DISTRICT - REPAIR/REPLACE CONCRETE ENTRANCE
WATER OPERATIONS WATER PUMP PROJECT
WATER SYSTEM INTERTIE CONNECTION
* WATER/SEWER MASTER PLAN UPDATE
TOTAL PROJECT EXPENDITURES
ENDING FUND BALANCE
PRIOR
YEARS
N/A
N/A
0
0
0
3,225,000
50,000
0
1,605,000
1,650,000
1,000,000
0
0
170,000
110,000
0
4,600,000
4,000,000
649,860
0
70,000
0
0
20,000
0
400,000
124,580
17,674,440
N/A
YEAR1
2002-2003
12,250,464
2,236,860
1,605,000
3,841,860
0
0
0
0
610,000
150,000
0
0
0
0
200,000
0
0
0
0
0
0
0
50,000
0
195,178
0
55,000
0
0
1,260,178
14,832,146
YEAR 2
2003-2004
14,832,146
2,281,597
0
2,281,597
0
0
0
0
0
0
0
0
0
0
400,000
0
0
100,000
0
0
0
20,000
0
150,000
196,272
0
0
0
0
866,272
16,247,471
YEAR 3
2004-2005
16,247,471
2,327,229
1,000,000
3,327,229
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
100,000
0
0
0
0
0
0
0
100,000
19,474,700
YEAR 4
2005-2006
19,474,700
241,249
0
241,249
0
0
0
0
0
0
0
0
0
0
400,000
0
0
0
0
0
0
0
0
0
0
0
0
0
0
400,000
19,315,949
YEARS
2006-2007
19,315,949
300,000
0
300,000
0
0
0
0
0
0
0
0
0
0
400,000
0
0
0
0
0
0
0
0
0
0
0
0
0
0
400,000
19,215,949
BUILDOUT
2007++
19,215,949
0
0
0
1,328,000
142,000
2,340,000
0
0
0
0
0
0
604,000
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
4,414,000
14,801,949
(1) Equal to the projected fund balance less any continuing appropriations.
* Project has multiple funding sources.
C-46
I GLOSSARY OF CAPITAL PROJECT FUNDING SOURCES ~~|
Assessments Districts (ASMT DIST) - Capital projects financed by the issuance of Assessment
District bonds. Projects include street construction and improvements to Alga Road and College
Boulevard.
Bridge and Thoroughfare Districts - Bridge and Thoroughfare District No. 3 developer fees to
partially fund Cannon Road improvements. Bridge and Thoroughfare District No. 2 developer
fees to partially fund the Poinsettia Lane and Aviara Parkway street construction project.
CFD #1 - The City of Carlsbad Community Facilities District No. 1 (Mello-Roos) funds civic
projects, I-5 interchanges, and road segments.
CFD #2 - The proposed City of Carlsbad Community Facilities District No. 2 will fund widening
and other improvements to Rancho Santa Fe Road.
County Grants (COUNTY) - County contributions partially fund Orion Street from El Camino Real
to Faraday.
Federal Grants (FED GRNT) - Projects funded from Federal Grants include the Coastal Rail
Trail and the Bridge on Rancho Santa Fe Road North.
Gas Tax - Gas Tax funding for street projects are received under the Streets & Highways Code
of the State of California.
General Capital Const. (GCC) - General Capital Construction funds, created through fund
transfers from the City's General Fund., are used to fund various municipal and other capital
projects.
Golf Course - The Golf Course Enterprise Fund is used to pay for construction of the City's
Municipal Golf Course.
Infrastructure Maintenance and Replacement Fund - Receipt of license taxes on new
construction and annual transfers from the General Fund pay for major maintenance and
replacement of the City's infrastructure.
Other - Contributions from other agencies or nearby cities fund projects including the Vista-
Carlsbad Sewer Interceptor and South Agua Hedionda Interceptor construction.
Park in Lieu (PIL) - Park in Lieu Fees are charged to developers for park acquisition and
development. PIL fees are segregated by quadrant to fund park projects: PIL Area 1 NW, PIL
Area 2 NE, PIL Area 3 SW, and PIL Area 4 SE.
Planned Local Drainage (PLD) - Drainage facilities necessitated by growth are paid from
developer Planned Local Drainage Fees.
Public Facilities Fees (PFF) - Public Facilities Fees are charged to developers to fund civic
facilities, park development, streets, traffic signals, and other facilities.
C-47
SDG&E - San Diego Gas & Electric Company installs underground utilities within the City
boundaries.
Sewer Benefit Area Fees (SEWER BENEF) - Development fees collected for the construction
and improvement of interceptor systems located within specific Benefit Areas.
Sewer Connection (SEWER CONN) - Development fees include Sewer Connection charges for
expansion of sewer lines and facilities.
Sewer Replacement (SEWER REPL) - Sewer Replacement is part of sewer user fees and pays
for repair and replacement of the City's existing sewer system.
State Grants (ST GRANT) - State Grants include funding for the Coastal Rail Trail and Carlsbad
Boulevard Bridge replacement.
Tax Increment Bond (REDVL BONDS) - Property taxes generated by increases in assessed
values in the Redevelopment project area. Funds are used to repay Tax Increment Bonds and
finance land acquisition and project construction in the downtown Village district.
TDA - City street and bicycle projects receive funding from Transportation Development Act
sales tax receipts.
Traffic Impact Fees (TIP) - Developer Traffic Impact Fees are used for various street
construction and improvement projects.
TransNet (TRNSNT/BIKE. /HWY, /LOCAL. /STP)- Receipts of County Sales Taxes allocated by
the San Diego Regional Transportation Commission finance various bicycle, freeway
interchange, and local road improvement projects.
Water Connection (WATER CONN) - Development fees include Major Facility Fees used to fund
expansion of water lines and various water projects.
Water Replacement (WATER REPL) - Water Replacement funds are included in water utility
rates and pay for the repair and replacement of existing water lines and facilities.
Water Recycled (RECL WATER) - Recycled Water is purified wastewater to be used for
irrigation purposes.
Zone 5. 13. 16 Park Fee (ZONE 5)- Fees paid by development in Local Facilities Management
Zones 5, 13, and 16 will fund the proposed Business Park Recreational Facility in the City's
industrial corridor.
C-48
APPENDICESAPPENDICES
)Key
CTTY OF CARLSBAD
PLANNED MAJOR CAPITAL OUTLAY ITEMS 2002-2003
Item Description Qty Cost
IfiENERAfcFHIW::::::::::::::::::::::;:::::;:::::;:;^-:::::-:::::::::::::;-:::::
0011410 PURCHASING
1 TOTAL LEADERSHIP GROUP & ADMIN1S 1 KA 1 1 Vt St
001 21 20 POLICE FIELD OPERATIONS
0012121 TRAFFIC
0012135 TASK FORCES
0012220 EMERGENCY OPERATIONS
I TOTAL PUBLIC SAFETY
001 301 0 COMMUNITY DEVELOPMENT ADMIN
0013610 BUILDING
I TOTAL COMMUNITY DEVELOPMENT
0014010 COLE LIBRARY - ADMIN
0014065 ARTS OFFICE
0014520 AQUATICS
0014541 RECREATION. OPERATIONS - STAGECOACH
0014543 RECREATION OPERATIONS - HARDING
I TOTAL COMMUNl 1 V SERVICES
001 6370 TRAFFIC SIGNAL MAINTENANCE
I TOTAL PUBLIC WORKS
0012210 FIRE ADMINISTRATION
1 TOTAL tAisi inti LEASES
(TOTAL GENERAL FUND
ISPEC»L:sui>iBS:;:;:;:;:;:>i:;:;:;:;t;:;:;:;:;:;:;:i:;:;:::;:;:;:;:;:;:;:;>:i>
121-2110 POLICE ASSET FORFEITURE
1 TOTAL POLICE ASSET FORFEITURE
5016310 WATER OPERATIONS
| IOIAL WAItK traitKKKISfc
5116310 SANITATION
:|
Furniture for scanning & document management system workstation
Subtotal Purchasing
RVICES
Marked police sedan with police package
Subtotal Police Operations
Marked police sedan with police package
Subtotal Police Field Operations
Unmarked police sedan with radio
Subtotal Task Forces
Thermal Imaging Camera
Subtotal Fire Emergency Operations
Scan/Read/Print machine for microfische reading/ printing
Subtotal Community Development Admin
Sub-compact sedan for code enforcement officer
Subtotal Building
Modular furniture for reference staff and manager.
Subtotal Cole Library Admin
Xerox copier with facsimile unit
Subtotal Arts
Customer Counter/Receptionist workspace
Subtotal Aquatics
Systems furniture for supervisor's office
Subtotal Operations - Stagecoach
Systems furniture for reception area
Subtotal Operations - Harding
Emergency Battery back-up system
Subtotal Traffic Signal Maintenance
800 MHz lease payoff
Subtotal Existing Leases
:l
Police patrol car equipment package
Subtotal Police Asset Forfeiture
Xerox copier (water/sewer sharing cost)
Update/replace obsolete tone telemetry communication equipment
Subtotal Water Operations
Xerox copier ( water/sewer sharing cost)
Subtotal Sanitation
1
1
1
1
1
1
1
1
1
1
1
1
6
1
1
26
1
I
15,000
15,000
$15,000 |
32,000
32,000
40,000
40,000
22,000
22,000
18,500
18,500
$112,500 |
15,026
15,026
17,000
17,000
$32,026 |
25,000
25,000
12,402
12,402
29,000
29,000
12,392
12,392
14,000
14,000
$92,794 |
42,023
42,023
$42,023 I
554,456
554,456
$554,456 I
$848,799
1
20,000
20,000
$2O,OOO 1
12,601
193,748
206,349
$206,349 I
see above
0
lUIALSANHAllON
D-1
Org Key Department
CITY OF CARLSBAD
PLANNED MAJOR CAPITAL OUTLAY ITEMS 2002-2003
Item Description Qty Cost
6215061 VEHICLE REPLACEMENT
I TOTAL VEHICLE REPLACEMENT
6401710 INFORMATION TECHNOLOGY
1 TOTAL INFORM A 1 ION It tnnuLOGY
1 TOTAL SPECIAL FUNDS
I GRAND TOTAL
Sedan - intermediate
Sedan - Police
SUV - full size
SUV - intermediate
Minivan
Motorcycle - full size
Motorcycle - all terrain
Truck - compact pickup
Truck - 1/2 ton pickup
Truck - 3/4 ton pickup
Truck - 1 ton flatbed
Truck - 1 ton utility
Truck - 10 cu. Yd dump
Truck - patch
Truck - paint large
Truck - fire
Radarboard, mobile
Compressor, trailer mounted
Steam cleaner, trailer mounted
Tractor, small
Mower, special
Subtotal Vehicle Replacement
Replace all 3Com routers with Cisco routers
Server hard drives
Replace file server for Faraday network
Internet caching device
Network attached storage (NAS)
Network/ web servers
Replace PC's and/or printers
Web server
Test/Training server
Internet virus scanning device
Subtotal Information Technology
2
9
2
2
3
1
2
3
3
6
1
2
1
1
1
1
1
1
1
1
1
15
20
1
1
3
2-4
200
1
1
1
36,000
230,000
76,000
52,000
63,000
12,000
18,000
54,000
60,000
144,000
28,000
60,000
92,000
60,000
170,000
380,000
15,000
13,000
8,000
15,000
21,000
1,607,000
$1,607,000 I
95,000
12,000
20,000
11,000
15,000
16,000
261,000
6,000
6,000
17,000
459,000
$459,OOO |
$2,292,349 1
$3,141,148 |
D-2
CITY OF CARLSBAD
OUT OF STATE TRAVEL REQUESTS 2002-2003
ORG KEY DEPARTMENT TRAVEL DESCRIPTION
#OF
PEOPLE DESTINATION
0010110
0010210
0010310
0011010
0011110
001111
0011112
0011210
0011310
0011410
0011510
0012110
0012130
0012131
0012140
0012141
0012210
0012220
0012225
0013010
CITY COUNCIL
CITY CLERK
CITY TREASURER
CITY MANAGER
ADMINISTRATIVE SERVICES ADMIN
ADMIN SERVICES - Special Projects
STRATEGIC CHANGE TEAM
CITY ATTORNEY
FINANCE
PURCHASING
HUMAN RESOURCES
POLICE ADMINISTRATION
POLICE INVESTIGATIONS
POLICE VICE/NARCOTICS
POLICE SUPPORT OPERATIONS
DARE
FIRE ADMINISTRATION
EMERGENCY OPERATIONS
FIRE - PREVENTION
COMMUNITY DEVELOPMENT
Meetings with Federal Legislators
Innovation Groups.Transforming Local Gov't Conference
IIMC Annual Conference
Election Center Training
Municipal Treasurers' Assoc of US/CAN Conference
Innovation Groups.Transforming Local Gov't Conference
ICMA Best Practices Conference
ICMA Annual Conference
Legislative Meetings
ICMA Annual Conference
IG Forum Meetings (quarterly)
Innovation Groups.Transforming Local Gov't Conference
Innovation Groups.Transforming Local Govt Conference
Research Training Trips
IMLA Annual Conference
IMLA Mid-Year Conference
Nat1 1 College of DA's - Govt Civil Practice
GFOA Conference
Software Users Conference
Innovation Groups National Purchasing Alliance (3 trips)
Disability Management Employer Coalition (DMEC)
Society for Human Resource Management (SHRM)
Linkage Certificate Program
Inf 1 Association of Chiefs of Police (ACP) Conference
For suspect and/or witness interviews
For suspect and/or witness interviews
CAD User Conference
National DARE Conference
International Fire Chiefs' Conference
Southern Area Fire Equipment Rescue Conference
Fire Investigation Training Seminar
National Fire Academy - Executive Development
Innovations Group School of Leadership & Change
ULI Conference
APA National Conference
4
5
1
1
1
3
4
3
10
1
1
8
3
4
1
1
1
1
3
1
1
1
2
1
3
3
1
1
3
1
7
1
1
Washington, DC
Piano, TX
Columbus, OH
Baltimore. MD, San Antonio. TX
Washington D. C.
Piano, TX
Tacoma, WA
Pennsylvania
Washington. DC
Pennsylvania
Western United States
Piano, TX
Piano. TX
Out of State
Denver, CO
Washington, DC
Park City, UT
Out of State
Out of State
Undetermined
San Antonio, TX
Orlando, FL
Various Locations
Minneapolis. MN
Unknown
Unknown
Reno, NV
Las Veaas. NV
Kansas Citv. MO
Reno, NV
Las Vegas. NV
Emmitsburg, MD
Various Destinations
TBD
Denver. CO
BUDGET
REQUEST
7.000
5,000
12,000
2.500
2.000
4,500
1,400
1,400
5,500
5,000
3,500
5,000
19,000
1,940
1,720
3,660
16,400
16,400
4,300
1.700
6,000
1.500
1,800
1,200
4,500
1,300
2,750
4,050
4,500
4,500
2,000
1,400
8,000
1 1 ,400
1,500
1,500
1,200
1,200
1.000
1,000
3.000
3,000
1.650
1,650
1.500
1,500
800
2.250
3,050
1.250
1,250
13,950
2,500
2.500
18,950
D-3
CITY OF CARLSBAD
OUT OF STATE TRAVEL REQUESTS 2002-2003
ORG KEY DEPARTMENT TRAVEL DESCRIPTION
#OF
PEOPLE DESTINATION
0013210
0013310
0013510
0013610
0014062
0014065
0014070
0014510
0014570
0015710
0016010
PLANNING
GEOGRAPHIC INFO. SYSTEMS
ECONOMIC DEVELOPMENT
BUILDING INSPECTION
GALLERY
ARTS OFFICE
LIBRARY
PARK PLANNING & REC MGMT
SENIOR PROGRAMS
ENGINEERING
PUBLIC WORKS ADMIN
APA National Conference
Permits Plus Users Conference
URISA Annual Meeting
ULI Real Estate School
ULI Workshop
Economic Development - Attraction Visit
Facility Site Visits
ULI Annual Conference
Int'l Conf of Bldg Officials Annual Business Mtg
Sierra "Permits" Annual Conference
American Assoc. of Museums Conference
American for the Arts National Conferecne
American Library Association Annual Conference
American Society of Landscape Architects
National Council on Aging Conference
AWWA Fall Conference
American Membrane Technology Association Conference
Permits Plus Users Conference
ASCE 2002 Pipelines Conference
APWA Conference
2
1
1
1
1
2
1
1
1
1
1
1
1
1
1
1
1
1
1
Denver, CO
Reno, NV
Chicago, IL
Western United States
Various - TBD
Various -TBD
Various - Out of state
Various - TBD
Fort Worth. TX
Reno. NV
New York. NY
Portland. OR
Toronto. Canada
New Orleans, LA
Washinoton D. C.
Reno, NV
Charleston, SC
Reno. NV
Cleveland. OH
Kansas City. MO
(TOTAL GENERAL FUND
BUDGET
REQUEST
4,000
2.000
6,000
2.100
2,100
2,600
1,000
1,500
10.000
1,000
16,100
1,000
1.000
2,000
1.700
1,700
2.500
2,500
1.200
1,200
1.900
1.900
1.650
1.650
2,000
1.500
900
2.000
6,400
3.500
3,500
165,560
1545710 STORM WATER PROTECTION Storm Water Conference 2 TBD
5016310 WATER OPERATIONS Colorado River Water Users Association
ACWA Spring Conference
Permits Plus Users Conference
AWWA Fall Conference
1 Las Vegas, NV
1 Lake Tahoe, NV
1 Reno, NV
3 Reno, NV
5026310 RECYCLED WATER OPERATIONS American Backflow Prevention Association
ttron User Conference
1 Las Vegas, NV
1 Ft. Lauderdate, FL
5116310 SANITATION OPERATIONS Harris Utility Billing Conference
Tri-State Water/Sewer Seminar
1 Las Vegas, NV
2 Laughlin, NV
6141610 RECORDS MANAGEMENT Annual ARMA Conference
AIIM Annual Conference
MER Conference
1 New Orleans. LA
1 New York, NY
1 Chicago. IL
D-4
CITY OF CARLSBAD
OUT OF STATE TRAVEL REQUESTS 2002-2003
m
m
m
gg
mm
Mi
••
m
«•
^
aM
ORG KEY DEPARTMENT TRAVEL DESCRIPTION
6401710 INFORMATION TECHNOLOGY Tivoli Disaster Recovery
Interop
Permits Plus Users Conference
Internet World
Brainshare
On-Line Learning Conference
Class Conference
Project Leadership Conference
FileNET Users Conference
AIIM Conference
Library Conference
NEC Users Conference
Harris Users Conference
#OF
PEOPLE
1
1
1
1
2
1
1
1
1
1
1
2
1
DESTINATION
Colorado Springs, CO
Las Vegas. NV
Reno, NV
TBD
Salt Lake City, Utah
TBD
Victoria, Canada
TBD
Washington D. C.
New York, NY
TBD
TBD
TBD
TOTAL OTHER FUNDS
GRAND TOTAL TRAVEL
BUDGET
REQUEST
3,500
2,300
1,100
1,500
5,400
2,500
1,500
2,400
2,200
2,200
1.000
4,500
2,000
32,100
55,850
$ 221,410
D-5
MISCELLANEOUS STATISTICAL INFORMATION 2002-03
Date of Incorporation
Type of City
Form of Government
Area
Population (CA Dept of Finance Report 01/01/02)
Net Assessed Valuation
July 16,1952
General Law
Council/Manager
42.19sq. miles
88,000
11,850,678,972
Streets:
Number of Street Lights
Miles of Streets
Fire Protection:
Number of Stations
Number of Firefighters & Officers
6,138
255
6
73
Police Protection:
Number of Stations 1
Number of Sworn Police Officers 109
Municipal Water District:
Number of Customers 75,000
Number of Water Connections 24,300
Average Daily Consumption (in Millions of Gallons) 17.6
Miles of Lines and Mains 400
Miles of Sewers 149
Recreation and Culture:
Number of Parks 37
Acres of Parks (Improved Community & Special Use Areas) 214
Acres of Open Space (Special Resource Areas & General
City-Owned Open Space) 490
Number of Pools 1
Number of Libraries 2
Number of Volumes 280,458
Total Number of Authorized Full-Time City Employees 642.75
Source: City of Carlsbad, Finance Department
D-6
ACCOUNTING SYSTEMS AND BUDGETARY CONTROL
The City's accounting system is designed around a few basic principles.
1. The City is not one single entity. It is the total of many entities, each with its separate
function and legal restrictions on the use of resources. In the private sector, a corporation
may have many "subsidiaries" which make up the parent corporation; in the public sector,
a city government may have a variety of "funds" that provide the basis for separately
recording the financial data related to a specific entity. A fund is an accounting entity with
a complete set of self-balancing accounting records. Each fund has been established
because of some restriction on the use of resources received by that fund. This report
includes the transactions of all entities over which the City Council of the City of Carlsbad
have authority (as defined by the Governmental Accounting Standards Board).
2. The City's accounting system operates on a modified accrual basis for all governmental
type funds. Governmental funds include the General, Special Revenue, Debt Service,
and Capital Projects funds. A modified accrual system is one where (a) revenues are
recognized when they are both measurable and collectable within the accounting period,
or soon enough after the end of the period to pay liabilities of the period; and (b)
expenditures, other than principal and interest on long-term debt, are recorded when
liabilities are incurred.
3. The proprietary fund types (the Enterprise funds and the Internal Service funds) use the
accrual method of accounting. Revenues are recognized in the period earned and
expenses are recognized in the period incurred.
4. Internal controls exist with the accounting system to ensure safety of assets from
misappropriation, unauthorized use or disposition, and to maintain the accuracy of
financial record keeping. These internal controls must be established consistent with the
sound management practices based on the cost/benefit of the controls imposed. The cost
of a control should not be excessive in relation to its benefit as viewed by City
management. The internal controls in existence within the City's system are sufficient to
ensure, in all material aspects, both the safety of the City's assets and the accuracy of the
financial record keeping system.
5. Budgetary control is maintained through monthly reports on all revenue and expenditure
accounts as well as special reports summarizing the financial position of the City. The
City Council has authority to control the budget through adoption of a formal budget at the
beginning of each year and by amending the budget as necessary throughout the year.
Expenditures should not exceed budgeted figures. All appropriations expire at year-end
unless specifically carried into the new fiscal year by Council actions. The Carlsbad
Municipal Code requires that the Financial Management Director prepare annually the
budget for the City Manager showing estimated revenues and expenditures.
6. Controls on the use and transfers of budget funds are outlined in the adopted budget
resolution in the appendix of this document.
D-7