Loading...
HomeMy WebLinkAbout; ; 2004 - 2005 Technical Appendix; 2005-01-01iiiiiiiliiiiiiiiiiiiriiiiifiiiiifiiif INTRODUCTION The purpose of this Technical Appendix is to provide a brief description of the project scope, location and need for those projects approved in the City of Carlsbad 2004-05 Capital Improvement Program (CIP) Budget. Also included at the beginning of each project category is a funding matrix which identifies the proposed funding source(s), funding amounts and timing for each of the approved CIP projects included with the respective category. All projects with any current or future funding are listed. Most of the cost estimates included in this appendix are preliminary as detailed designs have not been completed. All costs are in current dollars, therefore, projects in future years should be anticipated to escalate over time to account for inflation. I 1 f I I t I I I I I I I I f ] I • 1 I ) I • i I i i ) f i i i i ) i , i TABLE OF CONTENTS CIVIC PROJECTS Americans with Disabilities Act (ADA) Projects Funding Matrix for ADA Projects 1 Cannon Park 2 Administrative Facility Projects Funding Matrix for Administrative Facility Projects 3 Civic Center 4 Public Works Center 5 Police and Fire Facility Projects Funding Matrix for Police and Fire Facility Projects 6 Police and Fire CAD Implementation 7 Fire Station No. 3 (Relocation) 8 Fire Station No. 5 Storage Building/Restrooms 9 Fire Station No. 6 (Permanent) 10 City Safety Training Facility- Relocation 11 Library Facility Projects Funding Matrix for Library Facility Projects 12 Cole Library Expansion 13 Miscellaneous Projects Funding Matrix for Miscellaneous Projects 14 Coastal Rail Trail 15 Coastal Rail Trail Corridor Enhancement 16 Community Facilities District #1 Administration 17 Proposition "C" Projects 18 Public Works Inventory and Facilities Management Program 19 CUSD Administration Building Acquisition & Remodel 20 Village Public Parking Enhancement Program 21 Village Public Relations Campaign 22 FACILITY MAINTENANCE PROJECTS Facility Maintenance Projects Funding Matrix for Facility Maintenance Projects 23 Beach Access Repair/Upgrades 24 Calavera Community Center Siding 25 Chase Field Lighting Improvement 26 Cole Library HVAC Replacement "",27 Holiday Park Restroom Improvements 28 Laguna Riviera Park Restroom Replacement 29 Safety Center Building Improvements 30 Safety Center Conference Center Refurbishment 31 Carlsbad Senior Center Courtyard Renovation 32 Stagecoach Park Picnic Shelter 33 Stagecoach Park Synthetic Turf Fields 34 Swim Complex Filtration/Heating Renovation 35 Tot Lot Improvement Projects 36 Various Facility Concrete Repairs 37 PARKS PROJECTS Citywide Parks Projects Funding Matrix for Citywide Parks Projects 38 Business Park Recreational Facility 39 Carlsbad Municipal Golf Course 40 Lake Calavera Trails Master Plan 41 Veteran's Memorial Park 42 Northwest Quadrant Parks Projects Funding Matrix for Northwest Quadrant Parks Projects 43 Cannon Lake Park 44 Hosp Grove/Buena Vista Lagoon Recreational Improvements 45 Park Acquisition 46 Park Site Development - Pine School 47 Pine School Park- Phase II (Community Building) 48 Northeast Quadrant Parks Projects Funding Matrix for Northeast Quadrant Parks Projects 49 Hidden Canyon Park 50 Park Site Acquisition 51 Park Site Development 52 i } f i i i i I i i I i i i i i i i i i i ) i i i i I i f i f ! r I i i Southwest Quadrant Parks Projects Funding Matrix for Southwest Quadrant Parks Projects 53 Aviara Community Park - Phase 1 54 Aviara Community Park - Phase II (Community Building) 55 Aviara Reimbursement Agreement 56 Park Restoration and Acquisition 57 Poinsettia Community Park - Phase II 58 Poinsettia Park Synthetic Soccer Field 59 Southeast Quadrant Parks Projects Funding Matrix for Southeast Parks Projects 60 Alga Norte Park- Phase I 61 Alga Norte Park - Phase II (50 Meter Pool) 62 Leo Carrillo Park- Phases I & II 63 Leo Carrillo Park - Phase III 64 Park Restoration and Acquisition 65 DRAINAGE PROJECTS Drainage Projects Funding Matrix for Drainage Projects 66 Agua Hedionda Channel Improvements 67 Aviara Parkway Storm Drain Reimbursement 68 Carlsbad Boulevard Storm Drain Replacement 69 College Boulevard / Cannon Road (Calavera Creek Channel and Drainage Basin BJ) 70 College Boulevard / Cannon Road (Drainage Basin BJB) 71 College Boulevard Bridge Facility 72 College Boulevard Storm Drainage Facility BL 73 Faraday / Melrose Drainage Facilities 74 Gabbiano Lane Storm Drain Modification Study 75 Highland Drive Storm Drain 76 Master Drainage Plan Update 77 Miscellaneous Master Drainage Facilities 78 Miscellaneous Road Subdrains 79 Park Drive and Tamarack Avenue Storm Drain 80 South Carlsbad Village Storm Drain 81 Tamarack and El Camino Real Storm Drain and Siltation Basin 82 Tamarack and Sunnyhill Street Drainage Modifications 83 in i i i I i i iI I i i i i i i i i i i i i i i i i \ i i i i i i t SEWER PROJECTS Encina Water Pollution Control Facility Projects Funding Matrix for Encina Water Pollution Control Facility Projects 84 Building Improvements 85 Capital Acquisitions Replacement/Rehabilitation 86 Flow Equalization Project 87 Phase IV Expansion - Debt Service 88 Phase V Expansion 89 Pump Station Interfaces 90 Staffing / Professional Services & Misc 91 Technology Enhancement 92 Sewer Collection System Projects Funding Matrix for Sewer Collection System Projects 93 Avenida Encinas Gravity Sewer 94 Buena Vista Lift Station Force Main (VC-4) 95 Buena Vista Lift Station & Pump Addition 96 Carlsbad Trunk Sewer Reaches VCT1 A, VCT1B, VCT1C 97 El Camino Real Sewer - Chestnut to Tamarack 98 Forest Gravity Sewer 99 Foxes Sewage Lift Station Upgrade 100 Home Plant Lift Station 101 La Costa Meadows Sewer Extension 102 La Golondrina Sewer Extension 103 North Agua Hedionda Interceptor Rehabilitation - East Segment El Camino Real to Kelly Drive 104 North Agua Hedionda Interceptor Rehabilitation - West Segment Cove Drive to Hoover Street 105 North Agua Hedionda Trunk Sewer Reach NAHT1A 106 North Batiquitos Interceptor Rehabilitation 107 North Batiquitos Sewage Lift Station Modifications 108 Poinsettia Lane Sewer Relocation 109 Poinsettia Sewage Lift Station Odor and Noise Abatement 110 Removal of Existing Lift Stations 111 Sewer Lift Station - Miscellaneous Repairs & Upgrades 112 Sewer Line Refurbishment/ Replacement 113 Master Plan / Connection Fee Update 114 Sewer Monitoring Program 115 IV i i i i I i § l i I i i i i i i f t i i r i i i i i i i I i i i i i r i r i Sewer Collection System Projects (Continued) South Agua Hedionda Lift Station and Force Main 116 Vista/Carlsbad Interceptor Agua Hedionda Lift Station (VC 12) 117 Vista/Carlsbad Interceptor Sewer Reach VC11B 118 Vista/Carlsbad Interceptor Sewer Reaches VC13to VC15 119 Vista/Carlsbad Interceptor Sewer Reaches VC5A, 5B to 11A 120 Vista/Carlsbad Interceptor Sewer Rehabilitation Reaches 1 thru 3 121 WATER PROJECTS Water Distribution System Projects Funding Matrix for Water Distribution System Projects - Sheet 1 122 Funding Matrix for Water Distribution System Projects - Sheet 2 123 "D" Reservoir- Phase II 124 "D" Reservoir - Black Rail Road Improvements 125 Aviara Parkway 126 Calavera Hills Water Booster Station Standby Generator 127 Cannon Road East of El Camino Real 128 Carlsbad Boulevard South of Avenida Encinas 129 College Boulevard from Cannon Road to Carlsbad Village Drive 130 College Boulevard - Cannon Road to Badger Lane 131 College Boulevard (16" Line to Cannon Road) 132 College Boulevard Maerkle Reservoir to Agua Hedionda Creek 133 Crestview Drive Transmission Main 134 Demolition of Water Facilities at Pajama Drive 135 Desalination Groundwater/Seawater Study 136 El Camino Real (Palomar Airport Road South) 137 El Camino Real between College & Jackspar 138 El Camino Real Crossing at Kelly Drive 139 El Camino Real Transmission Main - Lisa Street to Kelly Drive 140 El Camino Real Transmission Main from Faraday Avenue to Cougar Drive 141 El Camino Real / Carlsbad Village Drive Water Pipeline Replacement 142 El Fuerte (North of Loker) 143 El Fuerte (Alga Road to Poinsettia Lane) 144 El Fuerte (Poinsettia Lane to Palomar Airport Road) 145 El Fuerte and Corintia Street 146 Faraday Avenue Extension 147 Foussat Road Well Abandonment 148 Lake Calavera Reservoir Improvements 149 v lifiiiiliiiiiiiiiifitiiiiiiiiiiitiiifi Water Distribution System Projects (Continued) Maerkle Pump Station 150 Maerkle Reservoir Storage (TAP #2) 151 Marron Road (Pressure Regulating Station to Oceanside) 152 Master Plan Update 153 Melrose Drive / Palomar Airport Road to Faraday 154 Miscellaneous Pipeline Replacements 155 Miscellaneous Storage Tank Repairs 156 Miscellaneous Water Reservoir Fencing 157 Oceanside Intertie Upgrade 158 Palomar Airport (North of Owens) 159 San Marcos Blvd. Pipeline Replacement Palomar Airport Road West of San Diego County Water Authority (SDCWA) 160 Palomar Airport Road/El Camino Real Pump Station 161 Poinsettia Lane (El Camino Real to "D" Reservoir) 162 Poinsettia Lane (El Camino Real to Skimmer Court) 163 Poinsettia Lane (Skimmer Court to Cassia Road 164 Poinsettia Lane East of Black Rail Road 165 Poinsettia Lane from "D" Reservoir to Ambrosia Lane 166 Pressure Reducing Station - Sycamore Creek 167 Pressure Regulating Station (Cannon Road and College Boulevard) 168 Rancho Carrillo Oversizing / Extension 169 Tanglewood Pressure Reducing Station Replacement 170 TAP Reservoir Exterior Painting 171 Water Operations Water Pump Project 172 Water System Intertie Connection 173 Recycled Water Projects Funding Matrix for Recycled Water Projects 174 Chestnut Avenue Recycled Water Line 175 Debt Service on State Loan 176 I-5 Recycled Water Transmission Line 177 Paseo Del Norte Recycled Pipeline Replacement 178 Pump Station Removal 179 Recycled Water Phase II - Facility 180 Recycled Water Phase II - Flow Equalization 181 Recycled Water Phase II - Mahr Reservoir Improvements 182 Recycled Water Phase II - Pipelines 183 Recycled Water Phase II - Pump Stations 184 vi iifiiiiifiiiiiiifiiiiiiiiiiitiiiiiiiii CIRCULATION SYSTEM PROJECTS Traffic Signal Projects Funding Matrix for Traffic Signal Projects - Sheet 1 185 Funding Matrix for Traffic Signal Projects - Sheet 2 186 Alga Road and Cazadero Drive 187 Alga Road and Xana Way 188 Aviara Parkway (Poinsettia Lane to El Camino Real) 189 Calle Barcelona and Paseo Aliso 190 Calle Barcelona and Paseo Avellano 191 Camino De Los Coches and Calle Acervo 192 Camino De Los Coches and La Costa Avenue 193 Camino Vida Roble and Yarrow Drive 194 Cannon Road and Avenida Encinas 195 Cannon Road and Car Country Drive 196 Cannon Road and College Boulevard 197 Carlsbad Boulevard and Avenida Encinas 198 Carlsbad Boulevard and Cherry Avenue 199 Carlsbad Boulevard and Oak Avenue 200 Carlsbad Village Drive and Glasgow Drive 201 Carlsbad Village Drive and Chatham Road 202 Carlsbad Village Drive and Avenida De Anita 203 College Boulevard and El Camino Real 204 College Boulevard and Carlsbad Village Drive 205 College Boulevard and Tamarack Avenue (S) (Lake Calavera Entrance) 206 College Boulevard and Tamarack Avenue (N) 207 El Camino Real / Plaza Drive / Marron Road / Hosp Way 208 El Camino Real and Poinsettia Lane 209 El Camino Real Corridor Study 210 Faraday Avenue and Cannon Road 211 Faraday Avenue and Camino Hills Drive 212 Faraday Avenue and Orion Street 213 Faraday Avenue and Priestly Drive 214 Faraday Avenue and Rutherford Road 215 La Costa Avenue and Esfera Street 216 La Costa Avenue and Levante Street 217 La Costa Avenue and Nueva Castilla Way 218 Melrose Drive and La Costa Avenue 219 Monroe Street and Hosp Way 220 vii i r ) i i i i i i i i f ] i } ; > { i i i i i i i i i i i i i i ; t i t i Traffic Signal Projects (Continued) Palomar Airport Road and Melrose Drive 221 Paseo Del Norte and Car Country Drive 222 Poinsettia Lane and Black Rail Road 223 Poinsettia Lane and Brigantine Road 224 Poinsettia Lane and El Fuerte Street 225 Poinsettia Lane and Melrose Drive 226 Poinsettia Lane and Paseo Escuela 227 Poinsettia Lane and Snapdragon Drive 228 Rancho Santa Fe Road and Calle Junipero (Formerly Melrose Drive South) 229 Rancho Santa Fe Road and San Elijo Road (Formerly Questhaven Road) 230 Tamarack Avenue and Pontiac Drive 231 Tamarack Avenue and Valley Street 232 Tamarack Avenue and Garfield Street 233 Street Projects Funding Matrix for Street Projects - Sheet 1 234 Funding Matrix for Street Projects - Sheet 2 235 Avenida Encinas Widening South of Palomar Airport Road 236 B&TD#2 Poinsettia Lane - Reach "C" (Black Rail Road to Zone 19 Boundary) 237 B&TD#2 Poinsettia Lane Reach "E" (Cassia Road to Skimmer Court) 238 B&TD#2 Poinsettia Lane Reaches "A" & "B"and Aviara Parkway 239 B&TD#2 Poinsettia Lane Reaches "F" & "G" (Skimmer Court to El Camino Real) 240 B&TD#3 - Cannon Road West 241 Cannon Road Reach 4B - College Boulevard to Oceanside 242 Cannon Road Widening from I-5 to Paseo Del Norte 243 Carlsbad Boulevard at Breakwater Road - Left Turn Lane 244 Carlsbad Boulevard Encinas Creek Bridge Replacement 245 Carlsbad Boulevard Median Tamarack Avenue to Pine Avenue 246 Carlsbad Boulevard Pedestrian Access Study 247 Carlsbad Boulevard Realignment - Phase 1 248 Carlsbad Boulevard Bridge Retrofit Over San Diego Northern Railroad 249 Carlsbad Boulevard Widening - Cannon Road to Manzano Drive 250 Carlsbad Village Drive Widening 251 College Boulevard Reach A and Cannon Road Reach 4A 252 College Boulevard / Cannon Road Reach 3 Assessment District 253 VIII I 1 I I I I I I I I 1 1 I 1 I ! I 1 f ! I I 1 I I I f I I I I 1 I ! I } I i Street Projects (Continued) El Camino Real and Carlsbad Village Drive 254 El Camino Real and Faraday Avenue 255 El Camino Real at Aviara Parkway/Alga Road 256 El Camino Real Medians 257 El Camino Real Widening - Rancho Carlsbad Drive to Sunnycreek Road 258 El Camino Real Widening La Costa Avenue to Arenal Road 259 El Camino Real Widening - Lisa Street to Crestview Drive 260 El Camino Real Widening - North of Cougar Drive 261 El Camino Real Widening Tamarack Avenue to Chestnut Avenue 262 Faraday Avenue / Melrose Drive Extensions 263 Faraday Avenue Mitigation - South of Cannon Road 264 Interstate 5 and La Costa Avenue Auxiliary Lanes 265 Melrose Drive and Alga Road 266 Olivenhain Road Widening Mitigation Monitoring 267 Palomar Airport Road and College Boulevard 268 Palomar Airport Road Widening and Bridge Reconstruction 269 Palomar Airport Road Widening at Paseo Del Norte 270 Pavement Management Program 271 Poinsettia Lane East of El Camino Real Financing Program 272 Poinsettia Lane Widening (Paseo Del Norte to Batiquitos Lane) 273 Rancho Santa Fe Road and Olivenhain Road Improvements 274 Rancho Santa Fe Road North Phase I 275 Rancho Santa Fe Road North Phase II 276 Rancho Santa Fe Road South (To Encinitas) 277 Sidewalk / Street Construction Program 278 Traffic Monitoring Program 279 Underground District No. 17 280 IX CIVIC PROJECTS I I f I I i I i I i I i l i I i i i i i i i i i i i i t f i I i i AMERICANS WITH DISABILITIES ACT (ADA) PROJECTS FUNDING MATRIX FOR AMERICAN'S WITH DISABILITIES ACT (ADA) PROJECTS PROJ NO. 38311 PROJECT TITLE ADA - CANNON PARK FUNDING SOURCE GCC TOTAL BUDGET 70,500 YEAR OF SERVICE 2004 FUTURE YEAR BUDGET AMOUNTS YEAR1 2004-2005 YEAR 2 2005-2006 YEAR 3 2006-2007 YEAR 4 2007-2008 YEARS 2008-2009 YEAR 6-10 2010-2014 BUILDOUT 2015-2020 I l I I I 1 I 1 I 1 i 1 I 1 I 1 I I I 1 i 1 i 1 i 1 I 1 I 1 I 1 Page 1 I 1 II II I * 1 I ! I l I I I 1 i I I 1 I 1 I I I i I 1 I i t CAPITAL PROJECT DESCRIPTION AMERICANS WITH DISABILITIES ACT (ADA) - CANNON PARK PROJECT NAME 38311 PROJECT NO. PROJECT LOCATION MAP:PROJECT LOCATION: Cannon Park - Northeast corner of Cannon Road and Carlsbad Boulevard. PROJECT DESCRIPTION: Provide handicap facilities to Cannon Park. Improvements include sidewalk to all facilities, handicap picnic area, handicap accessible drinking fountain, handicap accessible playground equipment, surfacing to equipment, and basketball court improvements. PROJECT NEED: This project is needed to bring all major park facilities into compliance with the American with Disabilities Act. New equipment and improved facilities will increase the safety of this park for citizens to use. FINANCING: Purpose Design Construction Total Cost = Estimated Cost $5,000 $65,500 $70,500 Funding Source GCC GCC CANPKADA.doc Page 2 f ) I i I i I I I i I i i i i i i i r I i i i i i i i i i i i i i i i i i i ADMINISTRATIVE FACILITY PROJECTS FUNDING MATRIX FOR ADMINISTRATIVE FACILITIES PROJECTS PROJ NO. 35721 35722 36551 PROJECT TITLE CIVIC CENTER PUBLIC WORKS CENTER PUBLIC WORKS CENTER PUBLIC WORKS CENTER FUNDING SOURCE CFD#1 CFD*1 WATER REPL SEWER REPL TOTAL BUDGET 21,284,000 10,950,757 4,830,000 2,310,000 YEAR OF SERVICE FUTURE YEAR BUDGET AMOUNTS YEAR1 2004-2005 100,000 YEAR 2 2005-2006 9,350,000 4,830,000 2,310,000 YEARS 2006-2007 10,642,000 YEAR 4 2007-2008 10,642,000 YEARS 2008-2009 YEAR 6-10 2010-2014 BUILDOUT 2015-2020 ii ii ii ii ii fi it ii ii •• •• II 11 11 11 ii Page 3 II II II f i f i i i f i ( i i i i i i i i i I i i ) i i i i t i i i i I i f i i i CAPITAL PROJECT DESCRIPTION ADMINISTRATIVE FACILITIES - CIVIC CENTER PROJECT NAME NONE PROJECT NO. PROJECT LOCATION MAP: PROJECT SITE PROJECT LOCATION: El Camino Real and Faraday Avenue. PROJECT DESCRIPTION: Redesign the existing 128,000 square foot "Farmers Building" at the intersection of El Camino Real and Faraday Avenue as a future City Hall and Council Chambers complex. Project will consolidate all administrative operations and facilities in one location for organizational and operational efficiency. Include 1% for public art. PROJECT NEED: Required to meet Growth Management Standards. FINANCING: Purpose Estimated Cost Funding Source Design/Construction $21,284,000 CFD #1 Total Cost = $21,284,000 CITYHALL.doc Page 4 CAPITAL PROJECT DESCRIPTION ADMINISTRATIVE FACILITIES - PUBLIC WORKS CENTER PROJECT NAME 35721,35722, 36551 PROJECT NO. PROJECT LOCATION MAP: PROJECT STE PROJECT LOCATION: Phase II of Safety & Service Center, Orion Way. PROJECT DESCRIPTION: Construction of Phase II of the Public Safety and Service Center consists primarily of the Public Works Center and associated improvements. The project includes office, shops, yard, warehouse, and parking to accommodate the Public Works MSA. The warehouse will also provide for citywide warehousing and storage. Additionally, the project increases Safety Center parking and includes funding for public art. PROJECT NEED: Required to meet Growth Management Standards. FINANCING: Purpose Estimated Cost Design/Construction $10,950,757 Design/Construction $2,310,000 Design/Construction $4,830,000 Funding Source CFD#1 Sewer Replacement Water Replacement Total Cost =$18,090,757 Annual Operating Cost = $159,080 COMMSERV Page 5 II II II II I I i i i i i i i i i i i i i i i i i i i i i i i i i i i i i j r i i i POLICE AND FIRE FACILITY PROJECTS FUNDING MATRIX FOR POLICE AND FIRE FACILITY PROJECTS PROJ NO. 36851 36881 39011 36861 PROJECT TITLE POLICE & FIRE CAD IMPLEMENTATION FIRE STATION # 3 RELOCATION FIRE STATION #5 STORAGE BUILDING/RESTROOMS FIRE STATION #6 - (PERMANENT) CITY SAFETY TRAINING FACILITY FUNDING SOURCE GCC PFF GCC PFF GCC TOTAL BUDGET 2,459,500 2,400,000 316,600 3,600,500 950,000 YEAR OF SERVICE 2006 FUTURE YEAR BUDGET AMOUNTS YEAR1 2004-2005 3,550,000 YEAR 2 2005-2006 YEARS 2006-2007 YEAR 4 2007-2008 YEARS 2008-2009 YEAR 6-10 2010-2014 2,400,000 BUILDOUT 2015-2020 •Illllllllllllfl Page 6 I I I I I II II II 11 II I f I 1 I 1 I 1 f 1 I 1 I 1 I I 1 1 I ] I ] I i I ] CAPITAL PROJECT DESCRIPTION POLICE AND FIRE FACILITIES - POLICE AND FIRE CAD IMPLEMENTATION PROJECT NAME 36851 PROJECT NO. PROJECT LOCATION MAP: NOT APPLICABLE PROJECT LOCATION: Safety Center. PROJECT DESCRIPTION: This project will replace an existing 13 year old Computer Aided Dispatch (CAD) system and implement an 800 MHz radio data communication system. The replacement of the CAD system is necessary due to the age and outmoded technology of the existing system and the inability to implement major portions of the data communications system due to the outmoded technology of the existing system. PROJECT NEED: The primary purpose of the CAD system is to enable the police and fire departments to provide a timely response to emergency incidents. This supports Council Goal Strategic Goal of Top Quality Services by being able to provide timely responses that result in high customer satisfaction and improve work processes through the use of best technology and information. The technology of the existing CAD system prevents the police and fire departments from implementing components of the 800 MHz Data Communication system such as Automatic Vehicle Locator (AVL), integration with City mapping system, records retrieval and field reporting. FINANCING: Purpose Installation Total Cost = Estimated Cost $2,459,500 $2,459,500 Funding Source GCC CAData Page 7 CAPITAL PROJECT DESCRIPTION POLICE AND FIRE FACILITIES - FIRE STATION NO. 3 (RELOCATION) PROJECT NAME NONE PROJECT NO. PROJECT LOCATION MAP: PROJECT SITE FIRESTA3 ii ii ii ii ii ii il ii PROJECT LOCATION: Southwest corner of Carlsbad Village Drive and Glasgow Street adjacent to Calavera Park. PROJECT DESCRIPTION: This new station will be a 6,000 square foot suburban facility housing one 3-person engine company. It will be the same design as Stations 4 and 6. After relocation, the existing Fire Station No. 3 building and site will be sold. Includes 1% cost for public art in compliance with Ordinance No. 1279. PROJECT NEED: Relocation of this fire station is required to ensure a five minute response time within the northeast quadrant of the City as development occurs. FINANCING: Purpose Environmental Design Construction Admin/Inspection Total Cost = Estimated Cost Funding Source $2,000 $180,000 $2,095,000 $123,000 $2,400,000 PFF PFF PFF PFF Page 8 § • li 11 11 fill firiiiliiiiifiiifiiiiiiiiiiiiifiii CAPITAL PROJECT DESCRIPTION 36881 POLICE AND FIRE FACILITIES - FIRE STATION NO. 5 STORAGE BUILDING/RESTROOMS PROJECT NO. PROJECT NAME PROJECT LOCATION MAP:PROJECT LOCATION: 2540 Orion Way adjacent to the Public Safety Center and Fire Station No. 5. PROJECT DESCRIPTION: Construct a 2,469 square foot combined public restrooms/secure storage facility adjacent to Fire Station No. 5. The structure will be designed and built to provide for fire equipment storage and roof ventilation training. The structure will be designed to accommodate a future second floor. The overall design will incorporate the same building materials as the existing building. The public restrooms will serve citizens utilizing the new Skateboard Park. PROJECT NEED: Current storage has been outgrown and portable, plastic enclosures are being used to alleviate problem. Project will provide additional enclosed, secure storage space at Fire Station No. 5. Facility will also include restrooms, vending machines, drinking fountain and pay phone for citizens using Skateboard Park. FINANCING: Purpose Construction Total Cost = Estimated Cost Funding Source $316,600 GCC $316,600 FSSstor Page 9 CAPITAL PROJECT DESCRIPTION POLICE AND FIRE FACILITIES - FIRE STATION NO. 6 (PERMANENT) PROJECT NAME 39011 PROJECT NO. PROJECT LOCATION MAP: fPKOJLCI SITE FIRESTA6.doc II || II •• il II PROJECT LOCATION: On the east side of the existing Rancho Santa Fe Road west of proposed Rancho Santa Fe Road. PROJECT DESCRIPTION: This new station will be a 6,000 square foot suburban facility housing one 3-person engine company. It will be the same design as Stations 3 and 4. This station will require a traffic signal to gain access onto Rancho Santa Fe Road for response to emergencies. The signal will only be activated for emergency egress. This station also requires an access easement across the Habitat Conservation Plan area that requires approval of the Department of Fish & Game and the U.S. Wildlife Service. After construction, the existing temporary Station No. 6 will be dismantled and the land restored for use by the developer. Includes 1 % cost for public art in compliance with Ordinance No. 1279. PROJECT NEED: The fire station is required to ensure a five minute response time within the southeast corner of the City as development occurs. FINANCING: Purpose Environmental Design Construction Acquisition Admin/Inspection Total Cost = Estimated Cost $152,500 $332,500 $2,625,000 $110,000 $380,500 $3,600,500 Funding Source PFF PFF PFF PFF PFF Page 10 II II II II r i i i i i i i i i i i f i i r c i i i i i i i i i i i i CAPITAL PROJECT DESCRIPTION i i 36861 POLICE AND FIRE FACILITIES - CITY SAFETY TRAINING RANGE - RELOCATION PROJECT NO. PROJECT NAME PROJECT LOCATION MAP: NONE Policerg PROJECT LOCATION: City of Carlsbad (CMWD) owned property southerly of Lake Calavera. PROJECT DESCRIPTION: Construct an outdoor Carlsbad Police Training Range including access road(s) and utilities, parking lot, storage and restroom facility, sound attenuation structure, earthen berms, and landscaping. PROJECT NEED: Necessitated by pending City Golf Course Project construction. Existing Police Training Range facility within Macario Canyon/Veteran's Memorial Park is to be removed. FINANCING: Purpose Design Construction Total Cost = Estimated Cost Funding Source $50,000 $900,000 $950,000 GCC GCC Page 11 I 1 I I f ! I ! I I f I I ! I I I 1 I I I I 1 I I 1 I I I I I 1 t 1 I j I I LIBRARY FACILITY PROJECTS FUNDING MATRIX FOR LIBRARY FACILITY PROJECTS PROJ NO. 32441 PROJECT TITLE COLE LIBRARY EXPANSION (35%) COLE LIBRARY EXPANSION (65%) SOUTH CARLSBAD LIBRARY POST OCCUPANCY (No TA) FUNDING SOURCE CFD#1 PFF CFDtM TOTAL BUDGET 5,200,000 8,320,000 56,355 YEAR OF SERVICE FUTURE YEAR BUDGET AMOUNTS YEAR1 2004-2005 YEAR 2 2005-2006 YEAR 3 2006-2007 YEAR 4 2007-2008 YEARS 2008-2009 YEAR 6-10 2010-2014 5,200,000 8,320,000 BUILDOUT 2015-2020 I I fill Page 12 I 1 I fitiiitlfitiiifififiilfiiiiitiiiiififi CAPITAL PROJECT DESCRIPTION LIBRARY FACILITIES - COLE LIBRARY EXPANSION PROJECT NAME NONE PROJECT NO. PROJECT LOCATION MAP:PROJECT LOCATION: At the site of the existing Cole Library, 1250 Carlsbad Village Drive, adjacent to the existing City Hall. PROJECT DESCRIPTION: Construction of a new 45,155 square foot library on the present site, east of the existing library building. PROJECT NEED: The Library Master Plan calls for expansion of the Cole Library to meet the growth management standard at buildout. The 1998 Feasibility Study recommends replacement of the existing library with a 45,155 square foot new building. This construction will satisfy the buildout growth management standard of 100,000+ square feet of library space. Project includes 1% for public art. FINANCING: Purpose Design/Construction Design/Construction Total Cost = Estimated Cost Funding Source $8,320,000 $5,200,000 $13,520,000 PFF CFD#1 EXP COLE Page 13 f i ( i f 1 i l I i C i i i I i f i i ) i 1 I I i i l I i i I i I i c i r i MISCELLANEOUS CITYWIDE PROJECTS FUNDING MATRIX FOR MISCELLANEOUS PROJECTS PROJ NO. 34553 34554 34556 36341 NEW NEW 36501 36531 PROJECT TITLE COASTAL RAIL TRAIL DESIGN (CMAQ) COASTAL RAIL TRAIL (TEA-21) COASTAL RAIL TRAIL COASTAL RAIL TRAIL - CORRIDOR ENHANCEMENT CFD#1 ADMINISTRATION PROPOSITION C PROJECTS PUBLIC WORKS INVENTORY AND FAC MAINT PROGRAM SENIOR CENTER - CUSD ACQUISITION SENIOR CENTER - CUSD ACQUISITION VILLAGE PUBLIC PARKING ENHANCEMENT PROGRAM VILLAGE PUBLIC RELATIONS CAMPAIGN FUNDING SOURCE FED GRNT FED GRNT TRANSNET/BIKE GCC CFD#1 GCC GCC REDVL VILLAGE GCC REDVL VILLAGE REDVL VILLAGE TOTAL BUDGET 4,044,194 1,157,187 231 ,488 110,000 1,210,000 29,636,000 404,992 1 ,380,000 815,000 851,215 50,000 YEAR OF SERVICE 2005 2005 2005 FUTURE YEAR BUDGET AMOUNTS YEAR1 2004-2005 1,564,247 305,753 120,000 110,000 1 ,380,000 815,000 YEAR 2 2005-2006 110,000 YEAR 3 2006-2007 110,000 YEAR 4 2007-2008 110,000 YEARS 2008-2009 110,000 YEAR 6-10 2010-2014 550,000 29,636,000 851,215 BUILDOUT 2015-2020 110,000 1 I I 1 I 1 II II Page 14 II II II i f I i i I 1 i i I i i i i i r i i i t l I I f i i i i i i i f i t i i i CAPITAL PROJECT DESCRIPTION MISCELLANEOUS CITYWiDE PROJECTS - COASTAL RAIL TRAIL PROJECT NAME 34552, 34553 & 34554 PROJECT NO. PROJECT LOCATION MAP UIY 01- OCLANSIUL CITY OF ENCINITAS Rl trail PROJECT LOCATION: Within the San Diego Northern Railroad (SDNRR) right-of-way between the Oceanside Transit Station and the Encinitas Coaster Station. PROJECT DESCRIPTION: Construction of a 16-foot wide paved multi-modal bicycle/pedestrian trail including graded shoulders, landscaping, signage, safety devices at roadway crossings, bicycle loop detectors and other ancillary facilities. The project also includes construction of a portion of a trestle bridge over the Agua Hedionda Lagoon. The Coastal Rail Trail through Carlsbad will be constructed in phases as funding allows. PROJECT NEED: The project accomplishes the Council goal of promoting multi-modal transportation facilities. The linking of four North County Coaster transit stations with a pedestrian/bicycle trail will encourage the use of non-motorized transport through the City, as well as to and from the transit stations. FINANCING: Purpose Project Study Report Project Study Report Design/Study Design/Study Design/Construction Construction Construction Construction Estimated Cost $192,000 $768,000 $120,000 $184,000 $5,824,000 * $4,513,500 * $600,000 $1,341,500 * Funding Source TSM CMAQ TDA APCD CMAQ TEA-21 TEA Trans/Bike Total Cost = $13,543,000* A total of $1,990,000 appropriated in FY 04/05 for construction of Phase I through portions of Carlsbad. CAPITAL PROJECT DESCRIPTION 34556 MISCELLANEOUS CITYWIDE PROJECTS - COASTAL RAIL TRAIL CORRIDOR ENHANCEMENT PROJECT NAME PROJECT NO. PROJECT LOCATION MAP:PROJECT LOCATION: Located in the coastal zone within City jurisdiction. The project is located within the railroad right-of-way on the west side of the tracks between Tamarack Avenue and Carlsbad Village Drive. PROJECT DESCRIPTION: Enhancement of the west side of the railroad right-of-way between Carlsbad Village Drive and Tamarack Avenue. The right-of-way is 200 feet wide, 100 feet on both sides of the existing tracks. Enhancements would include such amenities as a trail parallel to the tracks, special landscape treatment, picnic tables, drinking fountains, exercise equipment, tables and other appropriate features that will provide an attractive staging area for groups and commuters. The project also proposes a formal pedestrian crossing at Chestnut Avenue. PROJECT NEED: The project enhances the downtown rail corridor providing landscaping and alternative uses for the rail corridor and would be a compliment to the Coastal Rail Trail Project (Project No. 3455). This project would enhance an area of the railroad right-of-way that traverses through the Carlsbad Village Area and could be used by citizens and visitors to the downtown area. The project provides an opportunity to enhance a blighted area of town and provide for a linear park amenity. FINANCING: Purpose Property Acquisition Design Total Cost = Estimated Cost $27,500 $82,500 $110,000 Funding Source GCC GCC Annual Operating Cost = $5,000 Railcorr Page 16 11(11111 I I I I I i I I I 1 t I I 1 I I I I I 1 I I I 1 I I I i f I f 1 f 1 f ) I I CAPITAL PROJECT DESCRIPTION NONE MISCELLANEOUS CITYWIDE PROJECTS - COMMUNITY FACILITIES DISTRICT #1 ADMINISTRATION PROJECT NO. PROJECT NAME PROJECT LOCATION MAP: N/A CFD#1ADM PROJECT LOCATION: N/A PROJECT DESCRIPTION: City costs to administer Communities Facilities District No. 1 (CFD #1). PROJECT NEED: Administration of Communities Facilities District No. 1 is needed to assure that the CFD #1 taxes are properly levied and collected in conformance with State law and to be certain that funding for the CFD #1 projects is available at the time of need for the various projects. FINANCING: Purpose Administration Total Cost = Estimated Cost Funding Source $1,210,000 CFD#1 $1,210,000 Page 17 CAPITAL PROJECT DESCRIPTION MISCELLANEOUS CITYWIDE PROJECTS - PROPOSITION "C" PROJECTS NONE PROJECT NO. PROJECT NAME PROJECT LOCATION MAP: N/A PROP C Projects PROJECT LOCATION: In miscellaneous locations throughout the City not specifically determined at this time. PROJECT DESCRIPTION: Spending of funds from various sources including the General Fund in an amount over $1 million to construct recreational facilities including a swimming pool complex, trails linkages and open space, a city safety training facility and a portion of Cannon Road east of College Boulevard (known as Reach 4). PROJECT NEED: Projects are needed for various reasons including compliance with growth management standards, compliance with General Plan Goals and Objectives and other community needs. The expenditure of funds for these projects from various sources including the General Fund were approved by a vote of the qualified voters of Carlsbad in a general election. FINANCING: Purpose Land Acquisition/ Design/Construction Total Cost = Estimated Cost $29,636,000 $29,636,000 Funding Source GCC* * Other funding sources may be substituted in lieu of GCC Funds as such fund sources become available. Page 18 C 1 I I i f i i i i i i i I i i i i i i \ f i i i f i i i i i i i i i t i r ? i CAPITAL PROJECT DESCRIPTION MISCELLANEOUS CITYWIDE PROJECTS - PUBLIC WORKS INVENTORY AND FACILITIES MANAGEMENT PROGRAM PROJECT NAME 36341 PROJECT NO. PROJECT LOCATION MAP: NOT APPLICABLE PROJECT LOCATION: N/A PROJECT DESCRIPTION: This project will create a comprehensive computer based geographical information system (GIS) for all capital improvements maintained within the Public Works Major Service Area. In addition to establishing a computer inventory of all Public Works facilities, the program will establish service standards, track maintenance histories, identify hazard areas, project future replacement and maintenance needs and project future staffing levels needed to maintain the existing and projected Public Works inventory. PROJECT NEED: This project is needed to modernize the Public Works functions of the City. Presently, the inventory control and maintenance programming functions of the Public Works Service Area are disjointed, minimal or non-existent. This results in lowered maintenance and staffing efficiency. Completion of the program will result in better utilization of staff resources, improved maintenance of Public Works facilities, improved budgeting for maintenance services and capital projects and decreased facility life cycle costs. FINANCING: Purpose Data Acquisition/Programs Total Cost = Estimated Cost $404,992 $404,992 Funding Source GCC PW IN VENT Page 19 CAPITAL PROJECT DESCRIPTION NONE MISCELLANEOUS CITYWIDE PROJECTS - CUSP ADMINISTRATION BUILDING ACQUISITION & REMODEL PROJECT NO. PROJECT NAME PROJECT LOCATION MAP: CUSD_Adm •••iiaiiiiii PROJECT LOCATION: Part of the Carlsbad Senior Center building located at Pine and Harding. PROJECT DESCRIPTION: Acquire and remodel former CUSD Administrative Offices for City use. PROJECT NEED: Provide needed expansion for the Senior Center and office space for Recreation Department or other City functions. FINANCING: Purpose Acquisition Acquisition Total Cost = Estimated Cost $1,380,000 $ 815,000 $2,195,000 Funding Source Village Redevelopment GCC Page 20 I i I I I i I i I I I l i I I i t f t f I l i I i I I i f i i i i i i i CAPITAL PROJECT DESCRIPTION 36501 MISCELLANEOUS CITYWIDE PROJECTS - VILLAGE PUBLIC PARKING ENHANCEMENT PROGRAM PROJECT NO. PROJECT NAME PROJECT LOCATION MAP:PROJECT LOCATION: Within boundaries of Village Redevelopment Area. PROJECT DESCRIPTION: Implementation of recommendations within Village Parking Program, which include acquisition of land for future public parking, a study of impediments to full utilization of existing public parking lots, and improvements to existing public parking lots (as needed) to encourage full utilization of existing public parking lots. PROJECT NEED: Parking in the Village Redevelopment Area has been an issue for several years. A Village Parking Program is currently being prepared to address various parking issues within the Village. This program will identify recommended actions to pursue to address the underutilization of existing public parking lots and to plan for future parking needs. The proposed projects are consistent with the needs to address parking in the Village. FINANCING: Purpose Land Acquisition Total Cost = Estimated Cost $851,215 $851,215 Funding Source Village Redevelopment VILLGPKG.doc Page 21 CAPITAL PROJECT DESCRIPTION 36531 MISCELLANEOUS CITYWIDE PROJECTS - VILLAGE PUBLIC RELATIONS CAMPAIGN PROJECT NO. PROJECT NAME PROJECT LOCATION MAP: CAMPAIGN.doc • ••••Iflllll PROJECT LOCATION: Within boundaries of Village Redevelopment Area. PROJECT DESCRIPTION: Implementation of recommendation within Village Parking Program, which provides for a marketing study and public relations plan to encourage customers, business owners, and employees to park in existing public parking lots and to walk to their various destinations within the Village Redevelopment Area. PROJECT NEED: Parking in the Village Redevelopment Area has been an issue for several years. A Village Parking Program is currently being prepared to address various parking issues within the Village. This program will provide for a study and marketing plan to enhance the pedestrian-orientation desired for the Village Redevelopment Area. FINANCING: Purpose Public Relations Total Cost = Estimated Cost $50,000 $50,000 Funding Source Village Redevelopment Page 22 i • i i i i i • i a • FACILITY MAINTENANCE PROJECTS I 1 f i i i I I i I I 1 I i E ! I I I ) I 1 I i I 1 I I I I I 1 I 1 I } i i FACILITY MAINTENANCE PROJECTS FUNDING MATRIX FOR FACILITIES MAINTENANCE PROJECTS PROJ NO. 38961 39411 38841 39421 38971 39431 36381 35761 38611 39361 39371 38981 39441 39241 36651 PROJECT TITLE BEACH ACCESS STAIRS REPLACEMENT CALAVERA COMMUNITY CENTER SIDING CHASE FIELD LIGHTING IMPROVEMENTS COLE LIBRARY HVAC REPLACEMENT HOLIDAY PARK - RESTROOM IMPROVEMENTS LAGUNA RIVIERA PARK RESTROOM REPLACEMENT SAFETY CENTER - BUILDING IMPROVEMENTS SAFETY CENTER - CONFERENCE CENTER REFURBISHMENT SENIOR CENTER COURTYARD LANDSCAPING STAGECOACH PARK PICNIC SHELTER STAGECOACH PARK SYNTHETIC TURF SWIM COMPLEX - FILTRATION/HEATING RENOVATIONS TOT LOT IMPROVEMENTS VARIOUS FACILITY CONCRETE REPAIRS WATER DISTRICT - REPAIR/REPLACE CONCRETE ENTRANCE FUNDING SOURCE IRF IRF IRF IRF IRF IRF GCC GCC GCC GCC GCC IRF IRF IRF WATER REPL TOTAL BUDGET 300,000 60,000 300,000 800,000 387,200 170,000 50,000 200,000 30,000 100,000 1 ,600,000 263,300 162,000 192,000 20,000 YEAR OF SERVICE 2005 2005 2006 2006 2005 2006 2006 FUTURE YEAR BUDGET AMOUNTS YEAR1 2004-2005 250,000 60,000 40,000 170,000 100,000 1 ,600,000 162,000 YEAR 2 2005-2006 760,000 225,000 YEARS 2006-2007 YEAR 4 2007-2008 YEARS 2008-2009 YEAR 6-10 2010-2014 BUILDOUT 2015-2020 Page 23 • I II It 11 11 II II I 1 I i I i I 1 I I I 1 I ! I ) f 1 f i f 1 I 1 1 I I 1 CAPITAL PROJECT DESCRIPTION i i i i i i i i i i 38961 FACILITIES MAINTENANCE - BEACH ACCESS REPAIR/UPGRADES PROJECT NAME PROJECT NO. PROJECT LOCATION MAP: PROJECT SITE PROJECT LOCATION: Beach accesses at Christiansen Way, Beech Street, Carlsbad Village Drive, Grand Avenue, and Rue Des Chateaux. PROJECT DESCRIPTION: Provide major repairs to beach accesses, replace existing deteriorated beach access steps, railing, and foundations. Upgrade base (re-engineer) to withstand high surf conditions, use heavy aluminum for handrails to replace existing eroded galvanized metal. PROJECT NEED: Major repairs are required to keep the beach accesses in a long-term safe condition. These improvements will dramatically reduce the amount of labor and materials currently being expended on painting and maintenance of steps and handrails. FINANCING: Purpose Design Construction Admin/Inspection Total Cost = Estimated Cost $37,000 $257,000 $6,000 $300,000 Funding Source IRF IRF IRF BEACHACC.doc Page 24 CAPITAL PROJECT DESCRIPTION FACILITIES MAINTENANCE - CALAVERA COMMUNITY CENTER SIDING PROJECT NAME 39411 PROJECT NO. PROJECT LOCATION MAP: Calavera Itllflllllli PROJECT LOCATION: Calavera Community Center on Glasgow Drive. PROJECT DESCRIPTION: Replace approximately 2,000 square feet of existing redwood siding and underlying felt on the fascia of the Calavera Community Center. PROJECT NEED: Redwood siding and the underlying felt on the fascia of the building must be replaced to restore the aesthetics of the building and prevent water infiltration to the structural members. FINANCING: Purpose Admin/Inspection Construction Total Cost = Estimated Cost $3,500 $56,500 $60,000 Funding Source IRF IRF Page 25 i i f i I i I i I i I i i i c ; f i t i i i f i i i i i CAPITAL PROJECT DESCRIPTION I I I i I i I i i i 38841 FACILITIES MAINTENANCE - CHASE HELD LIGHTING IMPROVEMENT PROJECT NAME PROJECT NO. PROJECT LOCATION MAP: CHESTNUT AVE. PROJECT LOCATION: 3433 Harding (corner of Chestnut and Harding). PROJECT DESCRIPTION: Replacement of obsolete sports lighting and upgrade of site electrical systems to current electrical codes and standards. Construction includes demolition of the existing systems, abandonment of the obsolete underground and above ground electrical systems, replacement of the electrical systems with new equipment that meets current electrical code requirements, replacement of 14 sports light assemblies on wooden poles with 8 galvanized steel sports lights. Open trenching and boring of sports light foundations will be the primary methods of construction. PROJECT NEED: Chase Field was constructed approximately 25 years ago with volunteer efforts. The current sports lighting and site electrical systems are in poor condition and does not meet current Little League lighting standards or current electrical code. The project is intended to replace all these deficiencies with modern equipment that will provide increased safety to the public and better off site light control to minimize effects on the local residents. FINANCING: Purpose Design/Reports Construction Total Cost = Estimated Cost $28,000 $272,000 $300,000 Funding Source IRF IRF CHASE_#2 Page 26 CAPITAL PROJECT DESCRIPTION FACILITIES MAINTENANCE - COLE LIBRARY HVAC REPLACEMENT PROJECT NAME 39421 PROJECT NO. PROJECT LOCATION MAP: Cole lib PROJECT LOCATION: Cole Library- 1250 Carlsbad Village Drive. PROJECT DESCRIPTION: Complete refurbishing or replacement of the current HVAC system with modern, energy efficient HVAC systems to improve reliability, efficiency, and reduce repair and maintenance costs. PROJECT NEED: The HVAC system is in need of major refurbishment or complete replacement in order to provide environmental control of the Cole Library. Major components of the system are in poor condition due primarily to age. At this time, it is not cost-effective to continue the intensive maintenance that is required to keep the system operational. There is a potential for a major component failure due to the age of the system that would render the entire system non-operational. FINANCING: Purpose Design/Studies Construction Total Cost = Estimated Cost $40,000 $760,000 $800,000 Funding Source IRF IRF II III! Page 27 II II II f s i \ I i i i I i i iiiiiiiiifliiiiii CAPITAL PROJECT DESCRIPTION i i t i i i f i i i 38971 FACILITIES MAINTENANCE - HOLIDAY PARK RESTROOM IMPROVEMENTS PROJECT NAME PROJECT NO. PROJECT LOCATION MAP:PROJECT LOCATION: The two (2) restrooms are located in Holiday Park adjacent to Pio Pico Avenue. PROJECT DESCRIPTION: This project includes demolishing the two (2) existing 400 square foot facilities and constructing one (1) 750 square foot and one (1) 800 square foot facility for wheelchair accessibility and additional stalls and accessories. PROJECT NEED: This project will meet the Council goal of providing Top Quality Services and will also comply with ADA standards. FINANCING: Purpose Design Construction Inspection Total Cost = Estimated Cost $27,000 $347,700 $12,500 $387,200 Funding Source IRF IRF IRF Holiday Page 28 CAPITAL PROJECT DESCRIPTION FACILITIES MAINTENANCE - LAGUNA RIVIERA PARK RESTROOM REPLACEMENT PROJECT NAME 39431 PROJECT NO. PROJECT LOCATION MAP: Lagunapk II II II II II II PROJECT LOCATION: Corner of Park Drive and Kelly Drive, adjacent to Kelly School. PROJECT DESCRIPTION: Remodel and/or replace existing park restrooms. PROJECT NEED: The facilities have deteriorated with age and constant use. To keep the park in a top-quality condition, a complete remodel or reconstruction of the structure is necessary. FINANCING: Purpose Design Construction Inspection Total Cost = Estimated Cost $10,000 $150,000 $10,000 $170,000 Funding Source IRF IRF IRF Page 29 I • I 1 I !iiiitiiififififltltititiftijiiii CAPITAL PROJECT DESCRIPTION 36381 FACILITIES MAINTENANCE - SAFETY CENTER BUILDING IMPROVEMENTS PROJECT NAME PROJECT NO. PROJECT LOCATION MAP: PROJECT .SITE PROJECT LOCATION: The Public Safety Center at 2560 Orion Way. PROJECT DESCRIPTION: Upgrade and renovate several areas of the Safety Center including the Community Services Area, Report Writing Area, Patrol Civilian Community Services Officer Area, Sally Port Area, and Crime Lab/Cal ID Area and Conference Facility. Also included is the replacement of numerous broken chairs. PROJECT NEED: The Safety Center has now been in service for 12 years. There are several areas where upgrades or improvements are needed to eliminate unsightly conditions and improve occupant safety. Also proposed are some minor modifications to improve functionality, service quality and customer satisfaction. FINANCING: Purpose Construction Total Cost = Estimated Cost $50,000 $50,000 Funding Source GCC SCTRMISC Page 30 CAPITAL PROJECT DESCRIPTION 35761 FACILITIES MAINTENANCE - SAFETY CENTER CONFERENCE CENTER REFURBISHMENT PROJECT NO. PROJECT NAME PROJECT LOCATION MAP: ROJECT PROJECT LOCATION: The Public Safety Center at 2560 Orion Way. PROJECT DESCRIPTION: Hire a consultant to review the existing conference/training facilities at the Public Safety Center and to prepare a report recommending various ways to improve the facilities. Specific recommendations should include audio/visual improvements, lighting system enhancements, environmental controls, visual appearance and furniture needs. PROJECT NEED: The existing facility is nearly 12 years old and in need of an upgrade. The current sound system is inadequate for existing uses. Users of the facility complain of the lack of individual environmental controls and poor lighting. Improvements are needed to bring the audio/visual capabilities up to current technological standards. FINANCING: Purpose Refurbishment Total Cost = Estimated Cost Funding Source $200,000 GCC $200,000 SFTYCNTR Page 31 I 1 I 1 I 1 f 1 I I I I I 1 I i I I I I I 1 II II II II II II II I CAPITAL PROJECT DESCRIPTION i r i 11 ii ii 11 38611 FACILITIES MAINTENANCE - CARLSBAD SENIOR CENTER COURTYARD RENOVATION PROJECT NO. PROJECT NAME PROJECT LOCATION MAP:PROJECT LOCATION: Carlsbad Senior Center, 799 Pine Avenue. PROJECT DESCRIPTION: Re-landscape and upgrade the courtyard at the Carlsbad Senior Center including planting, irrigation new planters, hardscape improvements and possibly a water feature. PROJECT NEED: Landscaping in the Senior Center Courtyard has become overgrown during the past 12 years. A new plan incorporating new plantings and development of more user-friendly space is needed to make this feature of the facility more usable by the many customers. FINANCING: Purpose Design Construction Total Cost = Estimated Cost Funding Source $5,000 $25,000 $30,000 GCC GCC Page 32 Senctryd CAPITAL PROJECT DESCRIPTION FACILITIES MAINTENANCE - STAGECOACH PARK PICNIC SHELTER PROJECT NAME 39361 PROJECT NO. PROJECT LOCATION MAP:PROJECT LOCATION: Stagecoach Community Park, 3420 Camino de los Coches. PROJECT DESCRIPTION: Remove volleyball court and build picnic shelter. PROJECT NEED: To increase usage of Stagecoach Community Park by providing a shaded picnic area near an athletic field. FINANCING: Purpose Design Construction Admin/Inspection Total Cost = Estimated Cost $15,000 $77,000 $8,000 $100,000 Funding Source GCC GCC GCC Picnic Page 33 ii ii ii ii i a 11 11 I 1 II II i I II Hi 1 i II 11 II II II II il CAPITAL PROJECT DESCRIPTION • i ii i i i i i ii 39371 FACILITIES MAINTENANCE - STAGECOACH PARK SYNTHETIC TURF FIELDS PROJECT NAME PROJECT NO. PROJECT LOCATION MAP:PROJECT LOCATION: Stagecoach Park - Camino de los Coches PROJECT DESCRIPTION: Construct/install synthetic turf fields on field numbers 2 and 3 at Stagecoach Park. PROJECT NEED: Existing fields are in very poor condition and they cannot take the constant wear-and-tear from soccer and baseball activities. The growth in population has created a demand for fields that cannot be met with prolonged periods of closure. These fields will be open 365 days a year and maintenance cost can be reduced. FINANCING: Purpose Design Construction Admin/Inspection Total Cost = Estimated Cost Funding Source $25,000 $1,500,000 $75,000 $1,600,000 IRF IRF IRF Stgcoach2 Page 34 CAPITAL PROJECT DESCRIPTION 38981 FACILITIES MAINTENANCE PARKS - SWIM COMPLEX FILTRATION/HEATING RENOVATION PROJECT NO. PROJECT NAME PROJECT LOCATION MAP:PROJECT LOCATION: Inside equipment building of Swim Complex at 3401 Monroe Street. PROJECT DESCRIPTION: Perform structural changes to the Swim Complex to allow installation of a high-rate or rapid sand filtration system and replacement heating system. This will involve filling the current filter pit with gravel and capping it to allow placement of new filters and creating a new surge tank under the pool deck. PROJECT NEED: The facility is now over twenty years old and is heavily used by the general public, as well as school and community groups. There are many advantages of replacing the existing filtration system with an alternative system. The advantages of replacing the system include the ability to install motor speed controllers which would reduce electrical usage and cost when the pool is not in use and significantly reduced personnel hours due to lower maintenance. FINANCING: Purpose Design Construction Total Cost = CEQA Status = Exempt Estimated Cost $16,000 $247,300 $263,300 Funding Source IRF IRF Swimcom2 Page 35 » i ii ii i J ii ii i ii ii r i i i ii ii ii ii ii I 1 I i i i I i I iil ii t i li ii 11 ii li i! CAPITAL PROJECT DESCRIPTION 11 i i ii 11 i i 39441 FACILITIES MAINTENANCE - TOT LOT IMPROVEMENT PROJECTS PROJECT NAME PROJECT NO. PROJECT LOCATION MAP: Project Ste Fjroj'ect ite PROJECT LOCATION: • Stagecoach Park • Holiday Park • Scout House PROJECT DESCRIPTION: Hosp Grove Laguna Riviera This is the third and final phase for the tot lot improvement project. Phase III includes removing and replacing tot lot equipment, and installation of a rubberized surface. PROJECT NEED: This project is the final phase of updating existing playground equipment to comply with ADA and safety standards. FINANCING: Purpose Construction Total Cost = Estimated Cost $162,000 $162,000 Funding Source IRF Page 36 Tot lot CAPITAL PROJECT DESCRIPTION FACILITIES MAINTENANCE - VARIOUS FACILITY CONCRETE REPAIRS PROJECT NAME 39241 & 36651 PROJECT NO. PROJECT LOCATION MAP: VARIOUS CITYWIDE LOCATIONS Concrete PROJECT LOCATION: Various park and civic center locations. PROJECT DESCRIPTION: Removal and replacement of damaged concrete, flatwork, driveways, curbs, stairs, and parking lot islands at multiple facilities and parks throughout the City. PROJECT NEED: Multiple service areas have concrete surface improvements that are in need of repair. FINANCING: Purpose Administration Construction Construction Total Cost = Estimated Cost Funding Source $2,000 $20,000 $190,000 $212,000 IRF Water Replacement IRF Page 37 I i I I f i E a E t i j i i i • t I i • I i f i i i i i i I ft i 1 • I i PARKS PROJECTS r i I i I i i i i i i i i i i i i I i i i i i i i i i i i i i i i i i i i i CITYWIDE PARKS PROJECTS FUNDING MATRIX FOR CITYWIDE PARKS PROJECTS PROJ NO. 39721 38661 PROJECT TITLE BUSINESS PARK RECREATIONAL FACILITY CARLSBAD MUNICIPAL GOLF COURSE LAKE CALAVERA TRAILS MASTER PLAN/CONSTRUCTION VETERAN'S MEMORIAL PARK FUNDING SOURCE ZONES GOLF COURSE GCC CFD#1 TOTAL BUDGET 2,626,000 29,988,000 412,500 18,336,000 YEAR OF SERVICE 2006 FUTURE YEAR BUDGET AMOUNTS YEAR1 2004-2005 350,000 15,000 YEAR 2 2005-2006 28,650,000 312,500 YEAR 3 2006-2007 YEAR 4 2007-2008 YEARS 2008-2009 YEAR 6-10 2010-2014 9,168,000 BUILDOUT 2015-2020 2,626,000 9,168,000 Page 38 II fit) till fill! I 5 I i i i I i i i lliliiiiiiiiliiiil CAPITAL PROJECT DESCRIPTION I I I i I i I I I ! NONE CITYWIDE PARKS PROJECTS - BUSINESS PARK RECREATIONAL FACILITY PROJECT NAME PROJECT NO. PROJECT LOCATION MAP:PROJECT LOCATION: In Zone 5, at the corner of Faraday and Camino Hills. PROJECT DESCRIPTION: In FY 98-99, the City acquired 13 acres to develop into the Business Park Recreation Facility. Proposed amenities may include a fitness center, swimming pool, ball fields, soccer fields, basketball, handball, volleyball courts, picnic areas, jogging trails, etc. It is anticipated that staff will meet with the business park community to gather input into the most needed amenities. The City may explore privatization options for a portion of the development (e.g., the fitness center) which may accelerate development Project includes 1 % for public art. PROJECT NEED: Demand and need for recreational facilities within the industrial area identified through a Parks and Recreation Commission subcommittee who conducted two independent surveys and received input from Zone 5, 13, and 16 developers. FINANCING: Purpose Design/Construction Total Cost = Estimated Cost Funding Source $2,626,000 Zone 5 Fee $2,626,000 Page 39 BUS PARK.doc CAPITAL PROJECT DESCRIPTION CITYWIDE PARKS PROJECTS - CARLSBAD MUNICIPAL GOLF COURSE PROJECT NAME 39721 PROJECT NO. PROJECT LOCATION MAP:PROJECT LOCATION: Palomar Airport Road and College Boulevard. PROJECT DESCRIPTION: Design and construct an 18-hole championship golf course. Work will include grading, landscaping a clubhouse, access roads and utilities. The Golf Course Steering Committee may consider additional features to be included. PROJECT NEED: Because of strong citizen interest, the Parks and Recreation Commission recommended building a golf course. Part of the Parks and Recreation Element of the General Plan. FINANCING: Purpose Estimated Cost Design/Environmental $1,338,000 Construction $28,650,000 Funding Source Golf Course Enterprise Fund Golf Course Enterprise Fund Total Cost =$29,988,000 Annual Operating Cost = $195,000 GOLFDEV.doc Page 40 • i t a i i i i i i i I i 1 i I i . •i t i I i i 1 i i I i i • f i i i f i f i i i i i i 1 I I I i i I I i I i I i i 1 CAPITAL PROJECT DESCRIPTION I I f i I I I ! I 1 38661 CITYWIDE PARKS PROJECTS - LAKE CALAVERA TRAILS MASTER PLAN PROJECT NAME PROJECT NO. PROJECT LOCATION MAP: PROJECT SITE PROJECT LOCATION: In the Northeast Quadrant - Lake Calavera City Mitigation Site. PROJECT DESCRIPTION: Develop a Master Plan for a public multi-use, recreational trail system situated within a 266-acre property owned by the City. Trails to be developed as multi- purpose non-paved recreational trails with trailhead parking area, signage, benches, litter receptacles, interpretive signage and passive picnic areas. Project includes utilizing volunteers to construct approximately 2.5 miles of the proposed 5 miles of trails. PROJECT NEED: This project is part of the citywide trails program and trails in the Lake Calavera area have been identified in the City's Open Space and Conservation Resource Management Plan for the Lake Calavera area, as well as the Trails Feasibility Study done in 1990. Citizens surveys indicate the desire to have increased access to open space and trails. Voters approved Prop C in 2002 which identified trails as one of the recreational facilities they would support funding. FINANCING: Purpose Environmental Design Construction Total Cost = Estimated Cost $25,000 $40,500 $347,000 $412,500 Funding Source GCC GCC GCC Annual Operating Cost = $20,000 Lake_cal Page 41 CAPITAL PROJECT DESCRIPTION CITYWIDE PARKS PROJECTS - VETERAN'S MEMORIAL PARK PROJECT NAME NONE PROJECT NO. PROJECT LOCATION MAP:PROJECT LOCATION: This property is located south and east of Agua Hedionda Lagoon, near the geographic center of Carlsbad. PROJECT DESCRIPTION: The Master Plan for development of Veteran's Memorial Park includes the following improvements: streets, utilities, community leisure needs, open space interpretive area, parking and maintenance facility. Other suggested uses for this park area include amphitheater complex, sports complex, conference center and numerous other active/passive recreational amenities. Project funding includes 1 % for public art. PROJECT NEED: The Macario Canyon property has been under City lease or ownership for a number of years. The development of this property, since it is centrally located, would provide the needed parkland for all quadrants at buildout. Part of the Parks and Recreation Element of the General Plan. FINANCING: Purpose Design/Construction Total Cost = Estimated Cost $18,336,000 $18,336,000 Funding Source CFD#1 VETERAN.doc Page 42 • • 1 • i • f I i i k i 1 i » i J t • • • f i i i i • ( 1 i i t • i • i i i i i )( i i i i i i i t i i i i t i i i i i i i i i i ( i i i i NORTHWEST QUADRANT PARKS PROJECTS FUNDING MATRIX FOR NORTHWEST QUADRANT PARKS PROJECTS PROJ NO. NEW 38022 PROJECT TITLE CANNON LAKE PARK (6.7 ACRES) HOSP GROVE/BUENA VISTA LAGOON REC'L IMPROVEMENTS PARKLAND ACQUISITION PARK SITE DEVELOPMENT - PINE PARK SITE DEVELOPMENT - PINE COMMUNITY BUILDING FUNDING SOURCE PFF PIL-NW PIL-NW PFF PFF TOTAL BUDGET 2,058,000 1 ,280,000 600,000 6,199,000 3,885,000 YEAR OF SERVICE 2006 2004 FUTURE YEAR BUDGET AMOUNTS YEAR1 2004-2005 997,000 YEAR 2 2005-2006 YEARS 2006-2007 YEAR 4 2007-2008 YEARS 2008-2009 YEAR 6-10 2010-2014 600,000 3,885,000 BUILDOUT 2015-2020 2,058,000 1,280,000 • • i I i I l I I i i I i i I 1 i i Page 43 I 1 1 i i I 1 i 1 i i f 1 • i 1 I f I I I I 1 I i I I I I t i I I I 1 I i I I I I * I I I I ) CAPITAL PROJECT DESCRIPTION NORTHWEST QUADRANT PARKS - CANNON LAKE PARK PROJECT NAME I I I I i 1 I I I I NONE PROJECT NO. PROJECT LOCATION MAP: ROJECT SITE PROJECT LOCATION: In the Northwest Quadrant at Cannon Lake: South of Cannon Road and west of the AT&SF Railway tracks. PROJECT DESCRIPTION: Develop a 6.7 acre site. Development may include restrooms, parking and passive areas for picnicking and leisure recreation activities. Also includes 1% for public art. PROJECT NEED: Required to meet Growth Management Standards and identified in the Parks and Recreation Element of the General Plan. FINANCING: Purpose Design/Construction Total Cost = Estimated Cost $2,058,000 $2,058,000 Funding Source PFF CANLAKE.doc Page 44 CAPITAL PROJECT DESCRIPTION NORTHWEST QUADRANT PARKS - HOSP GROVE/BUENA VISTA LAGOON RECREATIONAL IMPROVEMENTS PROJECT NAME NONE PROJECT NO. PROJECT LOCATION MAP:PROJECT LOCATION: In the northwest quadrant including Hosp Grove and portions of the south shore of Buena Vista Lagoon between Hosp Grove and the ocean. PROJECT DESCRIPTION: Develop a variety of recreational opportunities including passive park areas, parking and staging areas within Hosp Grove. Also includes boardwalk segment and view areas along the south shore of Buena Vista Lagoon between the existing "Duck Observation Area" and 1-5 and pedestrian connections between existing Maxton Brown Park and the ocean. Includes 1% for public art. PROJECT NEED: Required to meet Growth Management standards and is part of the Northwest Quadrant Park Enhancement Program. FINANCING: Purpose Design/Construction Total Cost = Estimated Cost $1,280,000 $1,280,000 Funding Source PIL-NW Page 45 HOSPGRV2 i I l a i a i a ft • t I f I I I i I a f a f » i ) i i I a • I • a I a i i ! i I i f i i i I I i 1 i I i I H I f i f i I i i } CAPITAL PROJECT DESCRIPTION NORTHWEST QUADRANT PARKS - PARK ACQUISITION PROJECT NAME 11(111111! NONE PROJECT NO. PROJECT LOCATION MAP: HIGHWAY PROJECT LOCATION: To be determined at various locations within the northwest quadrant. PROJECT DESCRIPTION: Acquire additional park land required by Growth Management Standards. PROJECT NEED: To meet Growth Management Standards and the General Plan. FINANCING: Purpose Estimated Cost Funding Source Restoration/Acquisition $600,000 PIL-NW Total Cost = $600,000 NWQUADPK Page 46 CAPITAL PROJECT DESCRIPTION 38022 NORTHWEST QUADRANT PARKS - PARK SITE DEVELOPMENT - PINE SCHOOL PROJECT NO. PROJECT NAME PROJECT LOCATION MAP:PROJECT LOCATION: Pine School site; within the block of Harding, Pine, Chestnut and Madison. PROJECT DESCRIPTION: Develop seven (7) acres of land as a park. Development may include lighted baseball fields, lighted multi-use turfed area, roofed picnic structure, parking lot, tot-lot and landscaping. Construct a 20,000 square foot community center/gymnasium. Facility will include basketball, volleyball, gymnastics, aerobic exercise areas, meeting rooms, kitchen and office space. Also includes 1% for public art. PROJECT NEED: Required to meet Growth Management Standards and identified in the Parks and Recreation Element of the General Plan. FINANCING: Purpose Planning/Study Design Construction Admin/Inspection Total Cost = Estimated Cost $200,000 $848,000 $5,000,000 $151,000 $6,199,000 Funding Source PFF PFF PFF PFF Annual Operating Cost = $120,000 Parksit2 Page 47 i§i * i ) ii ft * fi ii 11 11 it I i I 1 t i I i i i i t i i i t i t i f i t i i CAPITAL PROJECT DESCRIPTION i i i i i i \ i i NONE NORTHWEST QUADRANT PARKS - PINE SCHOOL PARK - PHASE II (COMMUNITY BUILDING) PROJECT NAME PROJECT NO. PROJECT LOCATION MAP: SITE PROJECT LOCATION: Pine School site; within the block of Harding, Pine, Chestnut and Madison. PROJECT DESCRIPTION: Construct a 20,000 square foot community facility/gymnasium. Facility will include basketball, volleyball, gymnastics, multi-purpose rooms, meeting rooms, teen center, and office space. PROJECT NEED: Required to meet Growth Management Standards, identified in the Parks and Recreation Element of the General Plan, and meets Recreation Facility Guidelines for one community center per quadrant. FINANCING: Purpose Design Construction Total Cost = Estimated Cost $300,000 $3,585,000 $3,885,000 Funding Source PFF PFF Pinepkll Page 48 I i t j t i i f i i t i t i i I t i t i f i i i i ; t i f i i NORTHEAST QUADRANT PARKS PROJECTS FUNDING MATRIX FOR NORTHEAST QUADRANT PARKS PROJECTS PROJ NO. 38561 36981 38011 PROJECT TITLE HIDDEN CANYON PARK (22.3 ACRES) PARK SITE ACQUISITION (15 ACRES) NE QUADRANT PARK PARK SITE DEVELOPMENT (15 ACRES) FUNDING SOURCE PIL-NE PFF PIL-NE TOTAL BUDGET 1,758,000 4,550,000 4,000,000 YEAR OF SERVICE FUTURE YEAR BUDGET AMOUNTS YEAR1 2004-2005 YEAR 2 2005-2006 YEAR 3 2006-2007 YEAR 4 2007-2008 YEARS 2008-2009 YEAR 6-10 2010-2014 BUILDOUT 2015-2020 4,000,000 Page 49 • i i i i i f i • I i t i i i I i I t i f • < • I • • i i • i i • a t * i i i i i i i i i i t i f i t ) i t i ) i i f i i i i i CAPITAL PROJECT DESCRIPTION i i I NORTHEAST QUADRANT PARKS - HIDDEN CANYON PARK PROJECT NAME i i i i i 38561 PROJECT NO. PROJECT LOCATION MAP:PROJECT LOCATION: This project is located in the northeast quadrant on the north side of Carlsbad Village Drive, west of Concord Street. PROJECT DESCRIPTION: This 22.3 acre site is constrained by steep slopes, sensitive habitat and power lines. For that reason, grading and development will be confined to a small area. Park development may consist of limited grading and construction of two tot-lots, restroom, a picnic area, a level turfed area, a parking lot at Vancouver Street, expansion of gravel parking lot at Dog Park, and a trail system. Project funding includes 1% for public art. PROJECT NEED: Part of the Parks and Recreation Element of the General Plan and required to meet Growth Management Standards. Currently there are numerous apartments and attached housing projects in this area with a large number of children requiring recreational area. FINANCING: Purpose Design Construction Admin/Inspection Total Cost = Estimated Cost $90,000 $1,536,000 $132,000 $1,758,000 Funding Source PIL-NE PIL-NE PIL-NE Annual Operating Cost = $120,000 Page 50 HIDCNYPK CAPITAL PROJECT DESCRIPTION NORTHEAST QUADRANT PARK - PARK SITE ACQUISITION PROJECT NAME 36981 PROJECT NO. PROJECT LOCATION MAP: HWY /a PROJECT AREA PROJECT LOCATION: In the northeast quadrant. Possibly to be within the Robertson Ranch, at the future site of the flood control project just northeast of Rancho Carlsbad Mobile Home Park and adjacent to the future CUSD high school site. PROJECT DESCRIPTION: Acquire ± 15 acres for future development of ball fields. PROJECT NEED: Because of development constraints, Larwin Park was unable to fulfill the need for active ball fields. Therefore, ±15 acres will be acquired somewhere in the northeast quadrant for ballfield development to meet the City's guidelines for numbers of ball fields per quadrant. FINANCING: Purpose Land Acquisition Total Cost = Estimated Cost $4,550,000 $4,550,000 Funding Source PFF NEQUAD_1 Page 51 • i ii •§ IB ii ••f ft It II I I ( I f i t I i i i i i i I I i i I ) i i f i I i i i CAPITAL PROJECT DESCRIPTION NORTHEAST QUADRANT PARKS - PARK SITE DEVELOPMENT PROJECT NAME I 1 f J t } I I I I 38011 PROJECT NO. PROJECT LOCATION MAP: HWY /B PROJECT AREA PROJECT LOCATION: In future Robertson Ranch development near the corner of Cannon Road and El Camino Real. PROJECT DESCRIPTION: Develop ± 15 acres for soccer fields with restrooms and parking. PROJECT NEED: Because of development constraints, Hidden Canyon Park was unable to fulfill the need for active ball fields. Therefore, ±15 acres will be developed somewhere in the northeast quadrant for sports fields to meet the City's guidelines for numbers of sports fields per quadrant. FINANCING: Purpose Construction Total Cost = Estimated Cost $4,000,000 $4,000,000 Funding Source PIL-NE NEQUAD_3.doc Page 52 I 1 ! I f i t ! I I I 1 I ! I I I i t I i 1 I I t i t 1 t I f i I ! f ! i i SOUTHWEST QUADRANT PARKS PROJECTS FUNDING MATRIX FOR SOUTHWEST QUADRANT PARKS PROJECTS PROJ NO. 36991 36491 39451 38641 PROJECT TITLE AVIARA COMMUNITY PARK (24.25 ACRES)* AVIARA COMMUNITY PARK COMMUNITY BUILDING AVIARA REIMBURSEMENT AGREEMENT PARK RESTORATION AND ACQUISITION POINSETTIA COMMUNITY PARK - PHASE II POINSETTIA COMMUNITY PARK - SYNTHETIC SOCCER FIELD FUNDING SOURCE PFF PFF PIL-SW PIL-SW PFF IRF TOTAL BUDGET 10,700,000 3,675,000 238,000 2,300,000 8,505,000 763,992 YEAR OF SERVICE 2005 2007 FUTURE YEAR BUDGET AMOUNTS YEAR1 2004-2005 400,000 YEAR 2 2005-2006 YEARS 2006-2007 YEAR 4 2007-2008 YEARS 2008-2009 YEAR 6-10 2010-2014 3,675,000 8,105,000 BUILDOUT 2015-2020 2,300,000 Page 53 • i f i » i i i • I i i • i t i i i i i i I i i t j i i f i f i I i i i t i t i i I CAPITAL PROJECT DESCRIPTION i i t i i i i i 36991 SOUTHWEST QUADRANT PARKS - AVIARA COMMUNITY PARK - PHASE I PROJECT NAME PROJECT NO. PROJECT LOCATION MAP:PROJECT LOCATION: Northwest corner of Poinsettia Lane and Ambrosia Road. PROJECT DESCRIPTION: Construction of a 24-acre community park that would provide one lighted adult soccer field, one ballfield, two 1/2 court basketball court, tot-lot, open turf and picnic area, parking, and a maintenance building. Project includes 1% for Public Art. PROJECT NEED: Required to meet Growth Management Standards and identified in the Parks and Recreation Element of the General Plan. FINANCING: Purpose Planning/Study Environmental Design Construction Total Cost = Estimated Cost $235,000 $15,000 $250,000 ,$10,200,000 $10,700,000 Funding Source PFF PFF PFF PFF Annual Operating Cost = $340,000 Zone19-l Page 54 CAPITAL PROJECT DESCRIPTION NONE SOUTHWEST QUADRANT PARKS - AVIARA COMMUNITY PARK - PHASE II (COMMUNITY BUILDING) PROJECT NO. PROJECT NAME PROJECT LOCATION MAP:PROJECT LOCATION: Northwest corner of Poinsettia Lane and Ambrosia Road. PROJECT DESCRIPTION: Construction of two 18,000 square foot community facilities that would include meeting and activity rooms and park offices. Project includes 1 % for Public Art. PROJECT NEED: Required to meet Growth Management Standards and identified in the Parks and Recreation Element of the General Plan and meets the Recreation Facility Guidelines. FINANCING: Purpose Construction Total Cost = Estimated Cost $3,675,000 $3,675,000 Funding Source PFF Page 55 Zone19ll I I I I I I I i I I i i I 1 f i f I I I f 1 f 1 I i i 1 CAPITAL PROJECT DESCRIPTION I i ! I I I I } I I 36491 SOUTHWEST QUADRANT PARKS - AVIARA REIMBURSEMENT AGREEMENT PROJECT NAME PROJECT NO. PROJECT LOCATION MAP: PKUJLCI SITE PROJECT LOCATION: In the southwest quadrant, at the northern tip of Zone 19, north of Poinsettia Lane and west of El Camino Real. PROJECT DESCRIPTION: This is a reimbursement to the Aviara Land Associates Company made in accordance with the Aviara Master Plan parks agreement relating to the acquisition of property for the future Zone 19 park site. PROJECT NEED: The Zone 19 park is required to meet growth management for park land within the southwest quadrant. FINANCING: Purpose Reimbursement Total Cost = Estimated Cost $238,000 $238,000 Funding Source PIL-SW Aviareim Page 56 CAPITAL PROJECT DESCRIPTION SOUTHWEST QUADRANT PARKS - PARK RESTORATION AND ACQUISITION PROJECT NAME NONE PROJECT NO. PROJECT LOCATION MAP: HWY78 PROJECT LOCATION: To be determined at various locations in the southwest quadrant of the City. PROJECT DESCRIPTION: Restore existing parks when and as required; acquire additional park land required by Growth Management Standards; provide additional funds in the future if budgeted amounts fall short. PROJECT NEED: To meet Growth Management Standards and the General Plan. FINANCING: Purpose Estimated Cost Funding Source Restoration/Acquisition $2,300,000 PIL-SW Total Cost = $2,300,000 PKSWRSTR Page 57 I i I ! I j I 1 I 1 i I I \ C I I I I I I I f 1 I I I CAPITAL PROJECT DESCRIPTION 1 t I I 1 I I 1 { i 39451 SOUTHWEST QUADRANT PARKS - POINSETTIA COMMUNITY PARK (PHASE ID PROJECT NAME PROJECT NO. PROJECT LOCATION MAP: PKOJLCI PROJECT LOCATION: Poinsettia Community Park in the southwest quadrant east of Paeo del Norte between Palomar Airport Road and Poinsettia Lane. PROJECT DESCRIPTION: Phase II of this 42 acre park includes development of the remainder of the facilities called out in the Master Plan and not developed in earlier Phases. Amenities will include a community facility/gymnasium, enclosed soccer field, tot lot, picnic areas, tennis complex, and additional parking. Includes 1% for public art. PROJECT NEED: Required to meet Growth Management Standards and identified in the Parks and Recreation Element of the General Plan. Also needed to meet the Recreation Facility Guidelines. FINANCING: Purpose Design/Admin/lnsp Construction Total Cost = Estimated Cost $600,000 $7,905,000 $8,505,000 Funding Source PFF PFF Page 58 Poins CAPITAL PROJECT DESCRIPTION SOUTHWEST QUADRANT PARKS - POINSETTIA PARK SYNTHETIC SOCCER FIELD PROJECT NAME 38641 PROJECT NO. PROJECT LOCATION MAP: HKUJLCI SITE PROJECT LOCATION: Poinsettia Park at existing soccer field site. PROJECT DESCRIPTION: Replace existing natural grass field with a synthetic field filled over with ground- up rubber and sand. The field will have a substantial gravel base with appropriate drainage. PROJECT NEED: This new synthetic field would give our customers/users 365 days per year of usage. Currently, the demand of our users cannot be met and the field is closed almost four months per year. The new sand/rubber base field would help to reduce injury to users. There would be no clumps, uneven surface, or slippery conditions. A major factor supporting this project is the savings in labor. A new "fieldturf" soccer field would actually save substantial maintenance costs of $40,000+. The savings would be in water, fertilizer, seed, sod and all related renovation costs. FINANCING: Purpose Design Construction Total Cost = Estimated Cost $10,000 $753,992 $763,992 Funding Source IRF IRF Synthfld Page 59 • I I I » I I 1 I I I 1 I I I I I I I ! I I I I I I t I I I I I I 1 I 1 I i I I SOUTHEAST QUADRANT PARKS PROJECTS FUNDING MATRIX FOR SOUTHEAST QUADRANT PARKS PROJECTS PROJ NO. 38372 39251 34561 PROJECT TITLE ALGA NORTE PARK - PHASE I (30 ACRES) ALGA NORTE PARK - PHASE II (POOL) ALGA NORTE PARK - PHASE II (POOL) PROP C FUNDS LEO CARRILLO PARK - PHASE I & II LEO CARRILLO PARK - PHASE III PARK RESTORATION AND ACQUISITION FUNDING SOURCE PFF PFF GCC PFF PFF PIL-SE TOTAL BUDGET 13,829,308 5,936,000 5,364,000 6,163,000 2,100,000 800,000 YEAR OF SERVICE 2005 2,003 FUTURE YEAR BUDGET AMOUNTS YEAR1 2004-2005 851,308 5,364,000 YEAR 2 2005-2006 5,436,000 YEAR 3 2006-2007 YEAR 4 2007-2008 YEARS 2008-2009 YEAR 6-10 2010-2014 BUILDOUT 2015-2020 2,100,000 800,000 Page 60 1111 t I I ! f i ! 1 I 1 I 1 i I ! I I I I I I 1 I i I I I I CAPITAL PROJECT DESCRIPTION SOUTHEAST QUADRANT PARKS - ALGA NORTE PARK - PHASE I PROJECT NAME I i ! i i I i i i 38372 PROJECT NO. PROJECT LOCATION MAP: PKUJLCI PROJECT LOCATION: In the Southeast Quadrant, east of El Camino Real and north of and adjacent to future Poinsettia Lane. PROJECT DESCRIPTION: The first phase of this project will include development of approximately 30 acres of the proposed total of 30 acres of park. Amenities include ballfields, basketball courts, picnic areas, restrooms, parking, skate park, dog park, tot lots, etc. Also included is 1% for Public Art. PROJECT NEED: Required to meet Growth Management Standards and identified in the Parks and Recreation Element of the General Plan. FINANCING: Purpose Studies Design Construction Total Cost = Estimated Cost $250,000 $250,000 $12,329,308 $13,829,308 Funding Source PFF PFF PFF Annual Operating Cost = $347,000 ALGANOR2 Page 61 CAPITAL PROJECT DESCRIPTION 39251 SOUTHEAST QUADRANT PARKS - ALGA NORTE PARK PHASE II (50 METER POOL) PROJECT NO. PROJECT NAME PROJECT LOCATION MAP: PKUJLCI PROJECT LOCATION: In the Southeast Quadrant, east of El Camino Real and north and adjacent to the future Poinsettia Lane. PROJECT DESCRIPTION: Construction of a 50 meter pool with a pool office facility, showers/restrooms, parking and perimeter landscaping. PROJECT NEED: Alga Norte Park is identified in the Parks and Recreation Element as the site of a future public swimming pool. The existing swim complex is currently past capacity. A new 50 meter pool will assure that adequate swimming facilities will be available for current and future residents. Also includes 1% for Public Art. FINANCING: Purpose Design Construction Construction Total Cost = Estimated Cost $500,000 $5,436,000 $5,364,000 $11,300,000 Funding Source PFF PFF GCC (Prop C) Annual Operating Cost = $453,000 ALGANOR1 Page 62 • I II 11 II II II I i I 1 I I I I I I f I I 1 1 I I I I ! I 1 I i I I I CAPITAL PROJECT DESCRIPTION i i i r SOUTHEAST QUADRANT PARKS - LEO CARRILLO PARK PHASES I & II PROJECT NAME i i i i 34561 PROJECT NO. PROJECT LOCATION MAP:PROJECT LOCATION: In the Southeast Quadrant, approximately one mile south of Palomar Airport Road adjacent to the future extension of Melrose Drive and future Poinsettia Lane. PROJECT DESCRIPTION: Grading, historic renovation, infrastructure, landscaping and walkways. PROJECT NEED: Required per Growth Management standards. FINANCING: Estimated Cost $6,163,000 $6,163,000 Purpose Design/Construction Total Cost = Funding Source PFF Annual Operating Cost = $377,400 LEOCARIA Page 63 CAPITAL PROJECT DESCRIPTION SOUTHEAST QUADRANT PARKS - LEO CARRILLO PARK - PHASE PROJECT NAME NONE PROJECT NO. PROJECT LOCATION MAP:PROJECT LOCATION: In the Southeast Quadrant, approximately one mile south of Palomar Airport Road adjacent to the future extension of Melrose Drive and future Poinsettia Lane. PROJECT DESCRIPTION: Development of historical ranch into a community park. Project includes completion of remainder of Master Plan (not completed in Phase II). Project includes renovation of additional buildings, construction of additional restrooms, arboretum area, additional landscaping, etc. PROJECT NEED: Required to meet Growth Management Standards and identified in the Parks and Recreation Element of the General Plan. FINANCING: Purpose Design/Construction Total Cost = Estimated Cost $2,100,000 $2,100,000 Funding Source PFF LEOCRIII.doc Page 64 II II II I I I 1 I I i I I i I I ! 1 I 1 I 1 i 1 I ! I 1 f I I I I ! t I t \ I 1 I 1 I I CAPITAL PROJECT DESCRIPTION NONE SOUTHEAST QUADRANT PARKS - PARK RESTORATION AND ACQUISITION PROJECT NAME PROJECT NO. PROJECT LOCATION MAP: TO BE DETERMINED PROJECT LOCATION: To be determined at various locations in the southeast quadrants of the City. PROJECT DESCRIPTION: Restore existing parks when and as required; acquire additional park land required by Growth Management Standards; provide additional funds in the future if budgeted amounts fall short. PROJECT NEED: To meet Growth Management Standards and the General Plan. FINANCING: Purpose Estimated Cost Restoration/Acquisition $800,000 Total Cost = $800,000 Funding Source PIL-SE PKSERSTR Page 65 DRAINAGE PROJECTS Illlllllllillllllllllilltlllllllllllll DRAINAGE PROJECTS I l I i f 1 I i i i f r i I i I i i i I I I i I I l I t i I I I I 99 ooo'6i2' i. ooo'gee'oi. OZOZ-910Z inocnma ooo'oos ooo'eaz'i HOZ-OLOZ (H-Quvax 600Z-800Z 9UV3A 800Z-ZOOZ frHV3A ZOOZ-900Z CdVHA 900Z-SOOZ 2HV3A 000'9I2 ooo'96 198'9£Z £99'680't OOQ'08 sooz-^ooz 1.UV3A siNnowv lagans HVHA aunind 30IAH3S dO UV3A oo^'gi ooo'ezs' i 000'09l'L LSZ'L99't 61?3'8ZO'e ooo'ooz> OOO'OOS OOO'S/,2 DOO'002 OOO'OI. 000'9E6'Ol 000 >S2 009'992 ooo'se ooo'ooe 1.98'SZ.g ooo'eaz'i £99'680'|. OOO'OOS'2 ooo'os 000'062 009'092'l isoana 1V1O1 003 aid aid dJ.S/13NSNVd± XVI SVO OO1-13NSNVU1 aid dtdl ooo XVI SVO aid aid aid XVI SVO aid aid aid aid aid dUI aid aid sodnos ONIQNnd SNOIlVOIdlQO^ 33VNIVUQ miHANNHS QNV XOVyVWVl (.a. vaid/awiad) Nisva ins v NIVUQ >MUOIS HOB « >iovuviflivi (.a,, vaid) Nivua nyois aoxrniA avasnuvo Hinos Nivua IMUOIS 30\niiA avasiuvo Hinos Nivya ifliuois aovmiA avasnuvo Hinos Nivtia WHOIS 39\miA avasnyvo Hinos (.9. VQId) NlVdd IMyOlS 30N3AV XOVdVIWl QNV 3AIUQ »yVd SNivyaans avoa sno3N\m30siiAi SNivyaans avoy sno3N\m30SiiM SNivyaans avoy snosNVTHOSin S3iiniovd 30VNivya usisvw snosNxrnsosiw 3ivadn N\nd ysisvw Nivya wyois 3AiHa ONVIHOIH Nonvoidiaow Nivya i^iyois 3N\n ONVIOVO (.a. void) S3iiniovd ssvNivya 3Soyi3kN/Avavyvd (.a. vaid/awi3y) na Ainiovd Nivya i^iyois aAia 3031100 (.a. vaid/awigy) ia Ainiovd 3saiya OAIS 3031100 (,,a, vaid/awi3y - ara Nisva) ay NONNVo/aAia 3031100 (13NNVHO -yo vysAvivo QNV ra) au NONNVo/aAia 3031100 !N3iAi30vid3y NIVUO i^iyois aAia avasiyvo (.0. void) iN3W3synawi3y Nivya lAiyois AVMxuvd vyviAv (.a. void) 13NNVHO VONOI03H vnov aniu iosroud |.6E8e 68296 ^8296 282S6 1.8396 6^896 2t896 U896 I.ZZ86 I.S066 ifeee 93296 6969S 69696 tf296 Hr086 L8666 •ON roud SlO3rOdd 3OVNIVdQ HOd XIU1VIAI ONIONHd ijfifjfiiitititifffiiifitiitti CAPITAL PROJECT DESCRIPTION DRAINAGE PROJECTS - AGUA HEDIONDA CHANNEL IMPROVEMENTS PROJECT NAME I ! I ! 33381 PROJECT NO. PROJECT LOCATION MAP:PROJECT LOCATION; Along the Agua Hedionda Creek Channel, east of El Camino Real within Rancho Carlsbad Mobile Home Park. PROJECT DESCRIPTION: Studies to further determine the requirements per state and federal environmental agencies for the improvements to a 2,400 foot long section of Agua Hedionda Creek located just upstream of the El Camino Real drainage undercrossing. The proposed work includes dredging approximately 30,000 cubic yards of accumulated sediment, stabilization of the channel banks and widening of the channel at the confluence of the Agua Hedionda and Calavera Creeks and mitigation work for the impacts associated with the channel improvement project. Further studies will determine the scope of the mitigation work and the construction costs associated with mitigation and construction. PROJECT NEED: Required by the Drainage Master Plan to handle runoff from future development. FINANCING: Purpose Studies/Design Total Cost = Estimated Cost $1,260,500 $1,260,500 Funding Source PLDA "B" Fees STORMDR1.doc Page 67 CAPITAL PROJECT DESCRIPTION DRAINAGE PROJECTS - AVIARA PARKWAY STORM DRAIN REIMBURSEMENT PROJECT NAME 38041 PROJECT NO. PROJECT LOCATION MAP: ROJECT Avia_drn II II II II II II II PROJECT LOCATION: Along Aviara Parkway from Cobblestone Road to Encinas Creek. PROJECT DESCRIPTION: Reimbursement to developers for the construction of portions of Master Storm Drainage Facilities "C" and CFA. The constructed facility consisted of approximately 526 feet of 72-inch RCP and 1,257 feet of 66-inch RCP. The developer also constructed a portion of Master Storm Drainage Facility "C" consisting of approximately 150 feet of double barreled 8-foot by 8-foot box culvert beneath Aviara Parkway at Encinas Creek. A complete audit of construction costs for eligibility requirements will be undertaken prior to reimbursing the developer from the PLDA fund. The constructed facilities are in excess of the facilities identified in the Master Drainage Plan. Reimbursement will not exceed the value of the improvement costs as estimated in the Master Drainage Plan without first amending the Master Drainage Plan and revising the PLDA fees accordingly. PROJECT NEED: The above described Master Drainage Plan facilities were recently constructed by a developer. Pursuant to the provisions of the Local Drainage Area (PLDA) Fee Program, the developer is eligible to receive reimbursement for the cost of constructing these facilities in excess of the PLDA fees required of the developing project. FINANCING: Purpose Reimbursement Total Cost = Estimated Cost $290,000 $290,000 Funding Source PLDA"C" Page 68 I I I !1 i I i 1 1 i 1 i I I 1 I I I I I ] I i I I I J CAPITAL PROJECT DESCRIPTION i i I i i i i i i i 36241 DRAINAGE PROJECTS - CARLSBAD BOULEVARD STORM DRAIN REPLACEMENT PROJECT NO. PROJECT NAME PROJECT LOCATION MAP:PROJECT LOCATION: From Carlsbad Boulevard to the San Diego Northern Railroad tracks just south of the railroad overcrossing. PROJECT DESCRIPTION: Relocate and replace approximately 350 feet of 18-inch corrugated metal storm drain pipe (CMP) with a reinforced concrete storm drain pipe. Project would include installation of new storm drain inlets and an outlet. PROJECT NEED: The existing CMP has corroded away and drainage water is now undermining the soil column above the pipe. Recently, a sinkhole developed which required extensive maintenance repairs. The pipe crosses private property along a previously vacated street right-of-way. At one point, the pipe runs beneath a private structure built many years ago over the vacated street. Replacing the pipe will reduce the potential of local flooding on Carlsbad Boulevard and/or damage to the structure above the pipe as well as additional maintenance repairs. FINANCING: Purpose Planning/Study Design Construction Total Cost = Estimated Cost $7,000 $20,000 $53,000 $80,000 Funding Source IRF IRF IRF CBSTRMDR Page 69 CAPITAL PROJECT DESCRIPTION 36363 DRAINAGE PROJECTS - COLLEGE BOULEVARD / CANNON ROAD (CALAVERA CREEK CHANNEL AND DRAINAGE BASIN BJ) PROJECT NAME PROJECT NO. PROJECT LOCATION MAP: PKOJLCI SITE PROJECT LOCATION: Along Calavera Creek from El Camino Real to future College Boulevard and within the Little Encinas Creek immediately east of the future College Boulevard. PROJECT DESCRIPTION: Construction of a 49 acre-foot drainage retention basin covering approximately 8 acres of land within and adjacent to the Little Encinas Creek located east of the future College Boulevard at the northeast corner of the Rancho Carlsbad Mobile Home Park (RCMHP). Included with the project is a reinforced concrete box culvert. Also included is the improvement of the Calavera Creek overlfow channel located along the north side of the RCMHP perimiter wall. The construction of the retention basin will require relocation of an existing RV storage lot, community garden and maintenance yard owned by the RCMHP property owners association. The proposed site of the relocated facility is along the alignment of the Calavera Creek overflow channel. PROJECT NEED: This project is one in a series of projects designed to help reduce flooding along the Agua Hedionda Creek primarily within the RCMHP community. The series of projects include the construction of four floodwater retention basins, including Basin BJ, Basin BJB, the Melrose Drive Basin and the Faraday Avenue basin, and the dredging and/or improvement of the Agua Hedionda and Calavera Creek channels. FINANCING: Purpose Total Cost Total Cost = Estimated Cost $2,500,000 $2,500,000 Funding Source PLDA "B" Basin BJ Page 70 II II II II II II II II II II II II I I I 1 1 I 1 I II 11 11 I ] II II f 1 II II I i CAPITAL PROJECT DESCRIPTION ii ii 11 i i i i 36363 DRAINAGE PROJECTS -COLLEGE BOULEVARD / CANNON ROAD (DRAINAGE BASIN BJB) PROJECT NAME PROJECT NO. PROJECT LOCATION MAP:PROJECT LOCATION: Within and adjacent to Calavera Creek located at the northeast corner of the Cannon Road and College Boulevard intersection. PROJECT DESCRIPTION: Construction of a 49 acre-foot drainage retention basin covering approximately 15 acres of land within and adjacent to Calavera Creek located northeast of the College Boulevard and Cannon Road intersection. The project includes construction of a 11-foot by 7-foot reinforced concrete box extending across the College Boulevard and Cannon Road intersection, a 72-inch low flow pipe draining the retention basin, a concrete spillway and rock slope protection. PROJECT NEED: This project is one of a series of projects designed to help reduce flooding along the Agua Hedionda Creek especially within the RCMHP community. The series of projects include the construction of four floodwater retention basins, including Basin BJ, Basin BJB, the Melrose Drive Basin and the Faraday Avenue basin, and the dredging and/or improvement of the Agua Hedionda and Calavera Creek channels. FINANCING: Purpose Reimbursement Reimbursement Total Cost = Estimated Cost $ 550,000 $539,663 $1,089,663 Funding Source PLDA "B" Fed Grant Basin-BJB Page 71 CAPITAL PROJECT DESCRIPTION DRAINAGE PROJECTS - COLLEGE BOULEVARD BRIDGE FACILITY PROJECT NAME PROJECT NO. PROJECT LOCATION MAP: LAKE CAUWERA PROJECT LOCATION: At the College Boulevard crossing of the Agua Hedionda Creek. PROJECT DESCRIPTION: Construction of a bridge structure for the College Boulevard crossing of the Agua Hedionda Creek. PROJECT NEED: The project is needed to protect College Boulevard from flood damage. FINANCING: Estimated Cost Funding Source $1,783,000 PLDA "B" $1,783,000 Purpose Design/Construction Total Cost = Collbrdg Page 72 • * 11 11 II 11 II 11 II II II 11 11 •• II I I i 1 II 11 II II II II II I I I I II II CAPITAL PROJECT DESCRIPTION i i i i i i i i i i i i DRAINAGE PROJECTS - COLLEGE BOULEVARD STORM DRAIN FACILITY BL PROJECT NAME PROJECT NO. PROJECT LOCATION MAP: PROJECT SITE PROJECT LOCATION: Within College Boulevard from El Camino Real to Agua Hedionda Creek. PROJECT DESCRIPTION: Construction of a 70-inch and 90-inch RCP storm drain including inlets, outlet and appurtenances within College Boulevard from El Camino Real to the Agua Hedionda Creek. PROJECT NEED: The project is needed to control drainage within College Boulevard and protect College Boulevard for flood damage. FINANCING: Purpose Reimbursement Total Cost = Estimated Cost $275,861 $275,861 Funding Source PLDA "B" CoLblvd Page 73 CAPITAL PROJECT DESCRIPTION DRAINAGE PROJECTS - FARADAY/MELROSE DRAINAGE FACILITIES PROJECT NAME 36225 PROJECT NO. PROJECT LOCATION MAP: PROJECT PROJECT LOCATION: Within Faraday Avenue at the crossing of the Agua Hedionda Creek tributary draining the raceway properties. PROJECT DESCRIPTION: Construction of a 49 acre foot floodwater retention facility including a reinforced concrete box culvert beneath Faraday Avenue. PROJECT NEED: This project is one of a series of projects designed to help reduce flooding along the Agua Hedionda Creek especially within the RCMHP community. The series of projects include the construction of four floodwater retention basins, including Basin BJ, Basin BJB, the Melrose Drive Basin and the Faraday Avenue basin, and the dredging and/or improvement of the Agua Hedionda and Calavera Creek channels. FINANCING: Purpose Design/Construction Total Cost = Estimated Cost $300,000 $300,000 Funding Source PLDA "B" Farbasin Page 74 If II i I II II II II II II II 14 II II II II II II II II i I i J i I I i i i i I i r i i i i i I i I I f i i i f i CAPITAL PROJECT DESCRIPTION i i i i i i i i 39341 DRAINAGE PROJECTS - GABBIANO LANE STORM DRAIN MODIFICATION STUDY PROJECT NAME PROJECT NO. PROJECT LOCATION MAP:PROJECT LOCATION: Southerly end of Gabbiano Lane. PROJECT DESCRIPTION: Study the configuration of the public storm drain outlet and develop a revised configuration that will enable the adjacent private desiltation basin to drain entirely. PROJECT NEED: The project will identify a permittable project that will reduce the maintenance cost for both the private and public facilities associated with the storm drain outlet. FINANCING: Purpose Environmental Report Total Cost = Estimated Cost $15,000 $20,000 $35,000 Funding Source Gas Tax Gas Tax Gabbiano Page 75 CAPITAL PROJECT DESCRIPTION DRAINAGE PROJECTS - HIGHLAND DRIVE STORM DRAIN PROJECT NAME 39051 PROJECT NO. PROJECT LOCATION MAP: HighldSD II II If 11 II PROJECT LOCATION: North end of Highland Drive. PROJECT DESCRIPTION: Design and construct a portion of Drainage Master Plan Facility "AC" at the north end of Highland Drive. PROJECT NEED: The existing 24" CMP is undersized and in need of replacement. Master Drainage Plan Facility "AC" requires upsizing to a 36" RCP. FINANCING: Purpose Total Cost = Estimated Cost $256,600 Funding Source PLDA Page 76 1 I 1 i • I 1 I I I J I I I 1 i I I I I I I I I I I 1 I I I I I CAPITAL PROJECT DESCRIPTION i i i i i t i i i i 38721 DRAINAGE PROJECTS - MASTER DRAINAGE PLAN UPDATE PROJECT NAME PROJECT NO. PROJECT LOCATION MAP: VARIOUS LOCATIONS OF THE CITY PROJECT LOCATION: Throughout the City. PROJECT DESCRIPTION: Update the City's Master Drainage and Storm Water Quality Management Plan based on current growth projections and recent changes in NPDES requirements, and obtain necessary CEQA approval for adoption by City Council. PROJECT NEED: The Master Plan update will help identify the need for changes to planned facilities based on the timing of growth projections and NPDES requirements. The City's Master Drainage and Storm Water Quality Management Plan was completed in 1994. Since 1994, there have been several changes to the City's growth patterns due to the HMP and HCP that impact growth projections and densities in various areas of the City. This Master Plan is necessary for identifying the facilities needed to meet Growth Management Standards. In addition, recent changes in NPDES requirements should be incorporated in the City's Storm Water Quality Management Plan. FINANCING: Purpose Studies/Reports Total Cost = Estimated Cost $254,000 $254,000 Funding Source PLDA Drng_MP Page 77 CAPITAL PROJECT DESCRIPTION DRAINAGE PROJECTS - MISCELLANEOUS MASTER DRAINAGE FACILITIES PROJECT NAME NONE PROJECT NO. PROJECT LOCATION MAP: VARIOUS LOCATIONS THROUGHOUT THE CITY MASTRDRN PROJECT LOCATION: Various locations throughout the City. PROJECT DESCRIPTION: Construction of various major storm drain facilities within the City. The facilities funded through this program are outlined in the Master Drainage and Storm Water Management Plan. PROJECT NEED: Required to meet Growth Management Standards and identified in the Master Drainage and Storm Water Quality Management Plan. FINANCING: Purpose Design/Construction Total Cost = Estimated Cost $10,936,000 $10,936,000 Funding Source PLDA Fees Page 78 • * ti ii ii i j i i li il fi il li I 1 it II II II • I i • I i i 1 i 1 I i ijtififiiibitiiliiiiti CAPITAL PROJECT DESCRIPTION DRAINAGE PROJECTS - MISCELLANEOUS ROAD SUBDRAINS PROJECT NAME I 1 I 1 I ! f I 36811,36812, & 36813 PROJECT NO. PROJECT LOCATION MAP: HWY/ii PROJECT LOCATION: Nine locations throughout Carlsbad: 1. Carlina & Hataca Road 2. Calavo Court 3. Park Drive & Cove 4. Alicante & Corte De La Vista 5. La Costa Avenue & Cadencia PROJECT DESCRIPTION: 6. Quebrada Circle 7. Linda Lane 8. Avenida Nieve 9. Circulo Adorno Preparation of an engineering study report investigating the potential causes and remedies for various surface/subsurface drainage problems occurring at the various street locations listed above. Repairs will be made to the extent funding is available. Additional funding requests will be made after more detailed cost estimates are prepared in the study report. PROJECT NEED: Based upon citizen request and maintenance staff requests. 1. Save maintenance dollars 2. Mitigates hazards from slip and falls Relieve health hazards3. FINANCING: Purpose Planning/Study Planning/Study Design Construction Construction Total Cost = Estimated Cost $10,000 $30,000 $40,000 $275,000 $130,000 $485,000 Funding Source Gas Tax GCC GCC IRF GCC Misc drn Page 79 CAPITAL PROJECT DESCRIPTION DRAINAGE PROJECTS - PARK DRIVE AND TAMARACK AVENUE STORM DRAIN PROJECT NAME NONE PROJECT NO. PROJECT LOCATION MAP:PROJECT LOCATION: Along Park Drive from Monroe Street to Tamarack Avenue and along Tamarack Avenue from Park Drive to James Drive. PROJECT DESCRIPTION: Installation of approximately 2,100 linear feet of 24-inch diameter reinforced concrete storm drain pipe including access holes and other appurtenances. Identified within the Master Drainage Plan as facility "BCA". PROJECT NEED: Required to prevent flooding of properties west of Park Drive and north of Tamarack Avenue. The development of a proposed new subdivision east of Park Drive between Tamarack Avenue and Monroe Street will add the existing drainage and create a greater need for this master planned drainage facility. FINANCING: Purpose Planning/Study Construction Total Cost = Estimated Cost $100,000 $400,000 $500,000 Funding Source PLDA "B" PLDA "B" Parkjam Page 80 • a i • •fi ii ii fi ii fi R i till ii • •fi i a i a fa I 1 I I I I I i liiifitjiiilfiiitiiiiititiriti CAPITAL PROJECT DESCRIPTION DRAINAGE PROJECTS - SOUTH CARLSBAD VILLAGE STORM DRAIN PROJECT NAME 35281,35282, 35283 & 35284 PROJECT NO. PROJECT LOCATION MAP:PROJECT LOCATION: Oak Avenue to Agua Hedionda Lagoon along the easterly portion of the Northern San Diego Railroad right-of-way. PROJECT DESCRIPTION: Construct an underground storm drain system to carry storm water from the area bounded by Carlsbad Village Drive, Highland Drive, Garfield Street and Agua Hedionda Lagoon. The majority of the construction will occur within the Northern San Diego Railroad right-of-way. PROJECT NEED: The project will reduce flooding and standing water along its route. FINANCING: Estimated CostPurpose Construction Construction Construction Construction Total Cost = $4,700,000 $3,078,249 $1,561,751 $1,160,000 $10,500,000 Funding Source TransNet/Local Gas Tax TransNet/STP PLDA "B" SCBADVSD Page 81 CAPITAL PROJECT DESCRIPTION DRAINAGE PROJECTS - TAMARACK AND EL CAMINO REAL STORM DRAIN AND SILTATION BASIN PROJECT NAME NONE PROJECT NO. PROJECT LOCATION MAP:PROJECT LOCATION: At the southeast corner of Tamarack Avenue and El Camino Real. PROJECT DESCRIPTION: Reimbursement of developer fees for the construction of a 45-inch and 75-inch storm drainage system together with appurtenant inlets, access holes and outlet structures. Project also includes the installation of an approximate 32,000 cubic yard siltation basin. The project facilities are identified as facilities "BF'V'BFB" and Basin "BF1". PROJECT NEED: A developer is currently processing plans for developing a project at the southeast corner of Tamarack Avenue and El Camino Real. As a condition of development, the developer will be required to install the above-described Master Drainage Plan facilities. The cost of the facilities is expected to exceed the drainage fee obligation for the project, thus creating the need for reimbursement. The total cost of the facilities as estimated in the Master Drainage Plan is $1,323,000. The estimated fee obligation for the project is approximately $44,000. The amount of potential reimbursement is, therefore, $1,279,000. Reimbursement may occur during earlier years. Until a reimbursement agreement is prepared and agreed to by the City, staff did not want to pre-commit to a reimbursement schedule. FINANCING: Purpose Reimbursement Total Cost = Estimated Cost $1,279,000 $1,279,000 Funding Source PLDA "B" Fees TAMECRSD Page 82 •ill ii fi ii 11 till II il II 11 1 I I I I I I I I I i 1 I I I \ I I I I f I I I I I I CAPITAL PROJECT DESCRIPTION I I 1 I \ I \ ! I I I 38391 DRAINAGE PROJECTS - TAMARACK AND SUNNYHILL STREET DRAINAGE MODIFICATIONS PROJECT NO. PROJECT NAME PROJECT LOCATION MAP:PROJECT LOCATION: Along Sunnyhill Drive south of Tamarack Avenue. PROJECT DESCRIPTION: Modify the street grade and/or install drainage catch basins to eliminate cross-street drainage flows and flooding of adjacent residential property. PROJECT NEED: This project is the result of a citizen request to eliminate an existing street drainage problem along Sunnyhill Drive near its intersection with Tamarack Avenue. Due to the flat grade and lack of curb and gutter improvements along this section of Sunnyhill Drive, the street drainage backs up near the intersection of Tamarack Avenue and flows down an adjacent driveway. The owner of the property at this location has experienced significant damage to his property over the past several years. City maintenance crews previously reconstructed the adjacent street improvements to improve drainage at this location. The reconstruction reduced but did not eliminate the problem. Additional reconstruction and/or extension of nearby drainage facilities are needed to completely eliminate the problem. FINANCING: Purpose Design Construction Total Cost = Estimated Cost $5,000 $71,400 $76,400 Funding Source GCC GCC Tarn sun Page 83 SEWER PROJECTS i i i i f i i i t i t i r i I i i i i i f i i I I i i i i i i i i i I i i ENCINA WATER POLLUTION CONTROL FACILITY PROJECTS FUNDING MATRIX FOR ENCINA WATER POLLUTION CONTROL FACILITY PROJECTS PROJ NO. 34892 34112 36681 38071 36701 38851 36661 36662 PROJECT TITLE BUILDING IMPROVEMENTS CAPITAL ACQUISITIONS/REPLACEMENT/REHAB FLOW EQUALIZATION PROJECT PHASE IV EXPANSION - DEBT SERVICE PHASE V EXPANSION PUMP STATION INTERFACES STAFFING/PROF SERVICES AND MISC TECHNOLOGY ENHANCEMENT TECHNOLOGY ENHANCEMENT FUNDING SOURCE SEWER REPL SEWER REPL SEWER CONN SEWER CONN SEWER CONN SEWER REPL SEWER REPL SEWER CONN SEWER REPL TOTAL BUDGET 3,046,926 6,921,963 2,557,571 10,267,567 8,358,850 30,836 3,428,406 633,717 1,189,595 YEAR OF SERVICE FUTURE YEAR BUDGET AMOUNTS YEAR1 2004-2005 318,568 939,581 7,507,000 227,446 YEAR 2 2005-2006 223,290 936,394 241,898 YEARS 2006-2007 223,290 933,944 204,683 248,100 YEAR 4 2007-2008 223,290 935,506 161,265 YEARS 2008-2009 223,290 937,169 130,253 YEAR 6-10 2010-2014 1 ,629,605 4,656,782 692,737 262,270 BUILDOUT 2015-2020 3,744,179 928,191 1,645,672 679,225 Page 84 f 1 II II II II II II 11(1 I 1 I I f I I I I I I I I I I I I I I I I I I I I 1 I 1 CAPITAL PROJECT DESCRIPTION ENCINA WATER POLLUTION CONTROL FACILITY - BUILDING IMPROVEMENTS PROJECT NAME t I I I ! 34892 PROJECT NO. PROJECT LOCATION MAP: ROJECT PROJECT LOCATION: Encina Water Pollution Control Facility at 6200 Avenida Encinas. PROJECT DESCRIPTION: To construct and/or improve existing building facilities at the Encina Water Pollution Control Facility. Cost represents City's pro-rated share of the building improvements. Building improvements include: • Additional Office • Employee Locker Facilities • Expanded Laboratory Facilities PROJECT NEED: Needed to provide office and laboratory facilities at the Encina Water Pollution Control Facility. FINANCING: Purpose Estimated Cost Funding Source Design/Construction $3,046,926 Sewer Replacement Total Cost = $3,046,926 ENCINA-1 Page 85 CAPITAL PROJECT DESCRIPTION ENCINA WATER POLLUTION CONTROL FACILITY - CAPITAL ACQUISITIONS REPLACEMENT/REHABILITATION PROJECT NAME 34111 & 34112 PROJECT NO. PROJECT LOCATION MAP: PROJECT PROJECT LOCATION: Encina Water Pollution Control Facility at 6200 Avenida Encinas. PROJECT DESCRIPTION: Various Capital Improvements. Cost represents City's pro-rated share of the capital acquisitions, replacement, and rehabilitation. PROJECT NEED: To upgrade the existing plant. FINANCING: Purpose Estimated Cost Funding Source Design/Construction $6,921,963 Sewer Replacement Total Cost = $6,921,963 Page 86 ENCINA-2.doc • • ii • • le ii ii II f i i i f ; t i f i t i f i f i i I t » I i I i i i i i f i i CAPITAL PROJECT DESCRIPTION ENCINA WATER POLLUTION CONTROL FACILITY - FLOW EQUALIZATION PROJECT PROJECT NAME f j I 1 I I 36681 PROJECT NO. PROJECT LOCATION MAP: ROJECT PROJECT LOCATION: South of Palomar Airport Road on the east side of Avenida Encinas. PROJECT DESCRIPTION: Construction of a reservoir/tank to retain flows which exceed the capacity of the ocean outfall line. Retained flows would be released during periods of low flow. The retention reservoir/tank may double as a reclycled water reservoir. PROJECT NEED: Required to meet Growth Management Standards and identified in the Master Plan of Sewage. Construction of the project will eliminate the need for a second ocean outfall line. Cost represents the City's pro-rated share of the Flow Equalization Project. FINANCING: Purpose Studies/Engineering Total Cost = Estimated Cost $2,557,571 $2,557,571 Funding Source Sewer Connection FLOWEQ.doc Page 87 CAPITAL PROJECT DESCRIPTION NONE ENCINA WATER POLLUTION CONTROL FACILITY - PHASE IV EXPANSION DEBT SERVICE PROJECT NO. PROJECT NAME PROJECT LOCATION MAP: ROJECT PROJECT LOCATION: South of Palomar Airport Road on the east side of Avenida Encinas. PROJECT DESCRIPTION: Expansion of the Encina Water Pollution Control Facility to increase treatment capacity from 22.5 million gallons per day to 36.0 million gallons per day of raw sewage. Cost includes bond financing and interest costs. PROJECT NEED: Required to meet Growth Management Standards and identified in the Master Plan of Sewage. FINANCING: Purpose Debt Service Total Cost = Estimated Cost Funding Source $10,267,567 Sewer Connection $10,267,567 TREATPLT Page 88 f • it • i 11 ii ii I I I i I I 1 I I I I I i I i I I I i i i I I I i i I i i CAPITAL PROJECT DESCRIPTION ENCINA WATER POLLUTION CONTROL FACILITY - PHASE V EXPANSION PROJECT NAME I 1 I 1 I 1 I 1 38071 PROJECT NO. PROJECT LOCATION MAP: ROJECT PROJECT LOCATION: Encina Water Pollution Control Facility at 6200 Avenida Encinas. PROJECT DESCRIPTION: Expand the Encina Water Pollution Control Facility to buildout for the treatment of 45-60 MGD of wastewater. Cost represents City's pro-rated share of the Phase V expansion. PROJECT NEED: To provide for ultimate wastewater treatment capacity of the Carlsbad Sewer District. FINANCING: Purpose Estimated Cost Funding Source Design/Construction $8,358,850 Sewer Connection Total Cost = $8,358,850 EWPCF-V.doc Page 89 CAPITAL PROJECT DESCRIPTION 36701 ENCINA WATER POLLUTION CONTROL FACILITY - PUMP STATION INTERFACES PROJECT NO. PROJECT NAME PROJECT LOCATION MAP: ROJECT SITE PROJECT LOCATION: South of Palomar Airport Road on the east side of Avenida Encinas. PROJECT DESCRIPTION: The project consists of a review of the possible methods to develop active monitoring of the various sewer pump stations which pump sewage from outside agencies. Presently, City capacity at Encina is calculated by subtracting other agency flows from the available plant capacity. Development of an active interface to the pump station would provide more accurate and reliable measurement of the City's treatment capacity. PROJECT NEED: Required to assure that Growth Management Standards for sewer treatment capacity will continue to be met. FINANCING: Purpose Construction Total Cost = Estimated Cost Funding Source $30,836 Sewer Replacement $30,836 INTRFACE Page 90 liiifiiliiiitl i i i i i i { i i i i f i t i i i i i i f I I i i i l i I i t i i i CAPITAL PROJECT DESCRIPTION ENCINA WATER POLLUTION CONTROL FACILITY - STAFFING/PROFESSIONAL SERVICES & MISC. PROJECT NAME 38851 PROJECT NO. PROJECT LOCATION MAP: PROJECT PROJECT LOCATION: Encina Water Pollution Control Facility at 6200 Avenida Encinas. PROJECT DESCRIPTION: The funds for this project are used by the Encina Water Pollution Control Facility to develop and implement its buildout Capital Improvement Program. The cost is Carlsbad's share to cover staff, overhead and hiring consultants to design and develop bid specifications for future capital acquisitions and the replacement / rehabilitation of facilities at the sewer treatment plant. PROJECT NEED: To ensure the efficient and effective operation of Encina Water Pollution Control Facility. FINANCING: Purpose Estimated Cost Funding Source Admin/Professional Serv. $3,428,406 Sewer Replacement Total Cost = $3,428,406 ENCINA-Staffing.doc Page 91 CAPITAL PROJECT DESCRIPTION ENCINA WATER POLLUTION CONTROL FACILITY - TECHNOLOGY ENHANCEMENT PROJECT NAME 36661 & 36662 PROJECT NO. PROJECT LOCATION MAP: 'PROJECT PROJECT LOCATION: South of Palomar Airport Road on the east side of Avenida Encinas. PROJECT DESCRIPTION: Development of a master plan to evaluate new treatment technologies for possible incorporation into the Encina Treatment Plant. PROJECT NEED: New treatment technologies are constantly being developed. This study will help to evaluate whether any of the new technologies can be used in a cost effective manner at the Encina WPCF. Required to assure that Growth Management Standards for sewer treatment capacity will continue to be met. FINANCING: Purpose Master Plan Total Cost = Estimated Cost Funding Source $633,717 $1,189,595 $1,823,312 Sewer Connection Sewer Replacement TECHPLAN Page 92 Illlllllilfllll I I I 1 I 1 ! 1 t I f I I 1 f i I 1 i I I I I I I I I I I 1 I J I J I ! I ! SEWER COLLECTION SYSTEM PROJECTS FUNDING MATRIX FOR SEWER COLLECTION SYSTEM PROJECTS PROJ NO. NEW 33221 38911 36224 34951 36561 38731 39511 38741 35371 35381 38091 38101 38751 NEW 38401 39271 33241 39521 3828/ 3583 38551 34921 38861 39491 31821 31822 38671 39501 PROJECT TITLE AVENIDA ENCINAS GRAVITY SEWER BUENA VISTA LIFT STATION FORCE MAIN BUENA VISTA LIFT STATION CARLSBAD TRUNK SEWER REACHES VCT1 A, VCT1B, VCT1C (SBA V EL CAMINO REAL SEWER - CHESTNUT TO TAMARACK FARADAY AVENUE - ORION TO MELROSE SEWER FOREST GRAVITY SEWER FOXES SEWAGE LIFT STATION UPGRADE HOME PLANT LIFT STATION LA COSTA MEADOWS SEWER EXTENSION LA GOLONDRIA SEWER EXTENSION NORTH AGUA HEDIONDA INTERCEPTOR REHAB - EAST SEGMENT NORTH AGUA HEDIONDA INTERCEPTOR - WEST SEGMENT NORTH AGUA HEDIONDA TRUNK SEWER REACH NAHT1 A NORTH BATIQUITOS INTERCEPTOR REHABILITATION NORTH BATIQUITOS SEWAGE LIFT STATION MODIFICATIONS POINSETTIA LANE SEWER RELOCATION POINSETTIA SEWAGE LIFT STATION ODOR/NOISE ABATEMENT REMOVE EXISTING LIFT STATIONS SEWER LIFT STATION REPAIRS AND UPGRADES SEWER LINE REFURBISHMENT/REPLACEMENT SEWER MASTER PLAN/CONNECTION FEE UPDATE SEWER MONITORING PROGRAM SEWER MONITORING PROGRAM SOUTH AGUA HEDIONDA LIFT STATION AND FORCE MAIN VISTA/CARLSBAD INTERCEPTOR - PAVEMENT OVERLAY (Streets) VISTA/CARLSBAD INTERCEPTOR AGUA HEDIONDA LIFT STATION (VC12) VISTA/CARLSBAD INTERCEPTOR REACH VC1 1 B VISTA/CARLSBAD INTERCEPTOR REACH VC13 TO VC15 VISTA/CARLSBAD INTERCEPTOR REACH VC5A, 5B TO VC1 1 A VISTA/CARLSBAD INTERCEPTOR REACH VC5A, 5B TO VC1 1 A VISTA/CARLSBAD INTERCEPTOR REHAB REACHES 1 AND 2 VISTA/CARLSBAD INTERCEPTOR REHAB REACH 3 FUNDING SOURCE SEWER REPL SEWER CONN SEWER CONN SEW BENEF SEWER REPL SEWER REPL SEWER REPL SEWER REPL SEWER REPL SEWER REPL SEWER REPL SEWER REPL SEWER REPL SEWER REPL SEWER REPL SEWER REPL SEWER REPL SEWER REPL OTHER SEWER REPL SEWER REPL SEWER REPL SEWER CONN SEWER REPL SEW BENEF TRANSNET-LOC SEWER CONN SEWER CONN SEWER CONN SEWER CONN SEWER REPL SEWER REPL SEWER CONN TOTAL BUDGET 236,250 1,244,000 256,921 455,000 450,000 110,200 900,000 2,185,000 585,000 210,000 600,000 620,000 3,630,000 1,633,200 1,100,000 607,000 400,000 266,800 630,000 280,380 5,100,000 320,000 200,475 320,000 8,827,415 695,880 6,250,000 3,549,000 10,200,000 12,223,433 702,020 752,075 2,570,000 YEAR OF SERVICE 2003 2006 2006 2007 2007 2005 2005 2008 2008 2008 2007 FUTURE YEAR BUDGET AMOUNTS YEAR1 2004-2005 100,000 550,000 50,000 100,000 275,000 45,000 45,000 300,000 20,000 769,360 24,000 500,000 375,000 2,570,000 YEAR 2 2005-2006 160,000 600,000 158,000 60,000 300,000 20,000 5,130,640 625,000 4,700,000 YEAR 3 2006-2007 236,250 1,475,200 60,000 300,000 20,000 5,000,000 YEAR 4 2007-2008 100,000 80,000 300,000 20,000 YEARS 2008-2009 355,000 300,000 20,000 YEAR 6-10 2010-2014 1,500,000 320,000 100,000 BUILDOUT 2015-2020 1,244,000 430,000 1 ,800,000 120,000 Page 93 • • II II II « 1 II II fill i i i i i i i i c i i i i i i i t i i i i i i i i i i i i i i i i CAPITAL PROJECT DESCRIPTION 35811 SEWER COLLECTION SYSTEM - AVENIDA ENCINAS GRAVITY SEWER PROJECT NAME PROJECT NO. PROJECT LOCATION MAP:PROJECT LOCATION: Along north side of Lanakai Mobile Home Park. PROJECT DESCRIPTION: Replace approximately 1,000 feet of 8" gravity sewer. PROJECT NEED: The existing forcemain releases unacceptable levels of hydroden sulfide gas resulting in numerous odor complaints and deterioration of the gravity sewer system. FINANCING: Purpose Design/Admin/lnsp Construction Total Cost = Estimated Cost Funding Source $61,250 $175,000 $236,250 Sewer Replacement Sewer Replacement Avencsew Page 94 CAPITAL PROJECT DESCRIPTION NONE SEWER COLLECTION SYSTEM - BUENA VISTA LIFT STATION FORCE MAIN (VC-4) PROJECT NO. PROJECT NAME PROJECT LOCATION MAP:PROJECT LOCATION: Along the south shore of the Buena Vista Lagoon between the Buena Vista Lift Station and 1-5. PROJECT DESCRIPTION: Replace existing 16" pipeline with 24" pipeline to provide dual 24" force mains. PROJECT NEED: Increase capacity of sewer force main system to accommodate future sewer generation. FINANCING: Purpose Design Environmental Construction Admin/Inspection Total Cost = Estimated Cost Funding Source $75,000 $125,000 $944,000 $100,000 $1,244,000 Sewer Connection Fees Sewer Connection Fees Sewer Connection Fees Sewer Connection Fees Buenlift Page 95 Illlllllllllllill t i i i f i i i CAPITAL PROJECT DESCRIPTION 33221 SEWER COLLECTION SYSTEM - BUENA VISTA LIFT STATION & PUMP ADDITION PROJECT NAME PROJECT NO. PROJECT LOCATION MAP:PROJECT LOCATION: Adjacent to the east side of Jefferson Street just south of Buena Vista Creek. PROJECT DESCRIPTION: Upgrade and expand the lift station facility to a capacity of 15.5 million gallons per day (MGD). Improvements include revision to building to add a second floor, new control systems, new back-up generator and the addition of one new pump. Project costs will be shared with the City of Vista. The below stated cost estimate is Carlsbad's share of the total project cost. PROJECT NEED: Needed to meet future demand. FINANCING: Purpose Estimated Cost Funding Source Design/Construction $256,921 Sewer Connect. Fees Total Cost = $256,921 BUENASTA Page 96 CAPITAL PROJECT DESCRIPTION NONE SEWER COLLECTION SYSTEM - CARLSBAD TRUNK SEWER REACHES VCT1A. VCT1B. VCT1C PROJECT NAME PROJECT NO. PROJECT LOCATION MAP:PROJECT LOCATION: From Vancouver Street and Simsbury Court within Calavera Hills north to the Vista Carlsbad Trunkline located adjacent to Highway 78. PROJECT DESCRIPTION: Construct 1,000 feet of 8-inch diameter sewer, 2,000 feet of 10-inch diameter sewer, and 3,000 feet of 12-inch diameter sewer. PROJECT NEED: As Calavera Hills developed, several temporary sewage lift stations were constructed due to a lack of existing facilities downstream of the project sites. At the time, it was anticipated that the downstream properties would develop in a timely fashion negating any need for long-term maintenance of the temporary lift stations. The two listed stations are aging and in need of increased repair and maintenance. In lieu of expending the additional funds to upgrade temporary stations, staff is proposing completing the extension of the gravity lines from the stations to the existing Vista Carlsbad Trunk Line sewer. The lift stations would then be abandoned and removed. FINANCING: Purpose Land Acquisition Design Construction Total Cost = Estimated Cost Funding Source $20,000 $80,000 $355,000 $455,000 Sewer Benefit Zone Fee Sewer Benefit Zone Fee Sewer Benefit Zone Fee VCT1ABC Page 97 ft I II 11 II II II II 1 • • • II I I • • IB f I II I I I I i I I I i i i I i i i i i i i I i i i i i i i f \ i i i i i i i CAPITAL PROJECT DESCRIPTION 38911 SEWER COLLECTION SYSTEM - EL CAMINO REAL SEWER - CHESTNUT TO TAMARACK PROJECT NAME PROJECT NO. PROJECT LOCATION MAP:PROJECT LOCATION: The project is located in El Camino Real between Chestnut Avenue and Tamarack Avenue. PROJECT DESCRIPTION: Extend an 8" PVC sewer northerly in El Camino Real from Tamarack Avenue. The project consists of approximately 4,200 linear feet of 8" PVC and eleven sewer manholes. PROJECT NEED: Provides sewer service to existing homeowners which are currently on septic systems. Provides a health benefit within an urban area. FINANCING: Purpose Design Construction Estimated Cost $36,000 $414,000 Funding Source Sewer Replacement Sewer Replacement Total Cost = $450,000 Annual Operating Cost = $1,600 ECRchest Page 98 CAPITAL PROJECT DESCRIPTION SEWER COLLECTION SYSTEM - FOREST GRAVITY SEWER PROJECT NAME 34951 PROJECT NO. PROJECT LOCATION MAP: SEWER ALIGNMENT "A 78 PROJECT LOCATION: Along Forest Avenue at Highland Drive. PROJECT DESCRIPTION: Abandon sewage lift station and construct gravity sewer. PROJECT NEED: Existing lift station does not meet current electrical and ventilation safety requirements, and wet well and mechanical equipment need replacement. Sewer pipeline eliminates need for upgrade of facility. FINANCING: Purpose Design Construction Admin/Inspection Total Cost = Estimated Cost Funding Source $100,000 $700,000 $100,000 $900,000 Sewer Replacement Sewer Replacement Sewer Replacement Forststa Page 99 • 1 fl II II II II II f 1 1 1 II II II II •• i • II II • • • • iiiiiilfiilifiiiijfififlfiiitiiilififi CAPITAL PROJECT DESCRIPTION 36561 SEWER COLLECTION SYSTEM - FOXES SEWAGE LIFT STATION UPGRADE PROJECT NAME PROJECT NO. PROJECT LOCATION MAP:PROJECT LOCATION: North side of Agua Hedionda Lagoon east of Interstate 5. PROJECT DESCRIPTION: Upgrade electrical motors and controls, replace pumps, ventilation system, and repair or replace wetwell, acquire additional property. PROJECT NEED: Existing sewage lift station has safety hazards, does not meet current codes for electrical and ventilation safety, wetwell deteriorated, and pumps and controls need replacement. Wetwell volume needs to be increased and generator needs to be permanently mounted. FINANCING: Purpose Design/Construction Total Cost = Estimated Cost $2,185,000 $2,185,000 Funding Source Sewer Replacement FOXES LS Page 100 CAPITAL PROJECT DESCRIPTION SEWER COLLECTION SYSTEM - HOME PLANT LIFT STATION PROJECT NAME 38731 PROJECT NO. PROJECT LOCATION MAP: \ PACIFIC OCEAN PROJECT LOCATION: Home Plant Lift Station near Carlsbad Boulevard and northern City limits. PROJECT DESCRIPTION: Replace pumps, upgrade wetwell and manifold piping, relocate wetwell ventilation system, reconstruct influent sewer manhole, and replace 260 feet of 15-inch gravity sewer pipeline. PROJECT NEED: Field review shows that sand accumulating in the wet well is due to undersized pumps. Installing larger pumps, replacing existing pipeline, and completing the other upgrades will reduce the maintenance costs at the pump station. FINANCING: Purpose Design Construction Admin/Inspection Total Cost = Estimated Cost $50,000 $495,000 $40,000 $585,000 Funding Source Sewer Replacement Sewer Replacement Sewer Replacement Homeplnt Page 101 I I f I I 1 I I I 1 t 1 I 1 111 I i I i I I I I illiiifiijfilifiiiiititifiiif CAPITAL PROJECT DESCRIPTION 39511 SEWER COLLECTION SYSTEM - LA COSTA MEADOWS SEWER EXTENSION PROJECT NAME PROJECT NO. PROJECT LOCATION MAP:PROJECT LOCATION: In La Costa from the end of Chorlito Street to El Fuerte Street. PROJECT DESCRIPTION: Removal of the La Costa Meadows Lift Station and extension of an eight-inch gravity sewer approximately 600 feet to the new gravity sewer constructed in El Fuerte Street by the Rancho Carrillo project developer. PROJECT NEED: The La Costa Meadows Lift Station was constructed to temporarily divert sewage flows into existing Leucadia County Water District (LCWD) facilities. The diversion was required due to a lack of City sewer facilities located downstream of the La Costa Meadows project within the Rancho Carrillo Valley. The "diversion" agreement between the City and LCWD required the abandonment of the lift station and connection to City sewer facilities when the downstream properties were developed and new sewer facilities extended up El Fuerte Street. The needed downstream sewer collection facilities were recently constructed as part of the Rancho Carrillo project. FINANCING: Purpose Design Construction Admin/Inspection Total Cost = Estimated Cost Funding Source $25,000 $150,000 $35,000 $210,000 Sewer Replacement Sewer Replacement Sewer Replacement Lcmeadow Page 102 CAPITAL PROJECT DESCRIPTION SEWER COLLECTION SYSTEM - LA GOLONDRINA SEWER EXTENSION PROJECT NAME NONE PROJECT NO. PROJECT LOCATION MAP:PROJECT LOCATION: In La Costa from the end of La Golondrina Street north of Poinsettia Lane. PROJECT DESCRIPTION: Removal of the La Golondrina Lift Station and extension of an eight-inch diameter gravity sewer approximately 1,000 feet to the new gravity sewer constructed in Poinsettia Lane by the Rancho Carrillo project developer. PROJECT NEED: The La Costa Golondrina Lift Station was constructed to temporarily divert sewage flows into existing Leucadia County Water District (LCWD) facilities. The diversion was required due to a lack of City sewer facilities located downstream of the Ponderosa Homes project within the Rancho Carrillo Valley. The "diversion" agreement between City and LCWD require the abandonment of the lift station and connection to City sewer facilities when the downstream properties were developed and new sewer facilities extended up the future Poinsettia Lane. The needed downstream sewer collection facilities were recently completed as part of the Rancho Carrillo project. FINANCING: Purpose Planning/Study Land Acquisition Environmental Design Construction Admin/Inspection Total Cost = Estimated Cost Funding Source $10,000 $5,000 $25,000 $60,000 $435,000 $65,000 $600,000 Sewer Replacement Sewer Replacement Sewer Replacement Sewer Replacement Sewer Replacement Sewer Replacement La_golon Page 103 II II II • I i i i \I I I I I I I I I ! I I I 1 I I I 1 I I I I I 1 CAPITAL PROJECT DESCRIPTION t 1 I 1 t I I I i I 38741 SEWER COLLECTION SYSTEM - NORTH AGUA HEDIONDA INTERCEPTOR REHABILITATION - EAST SEGMENT EL CAMINO REAL TO KELLY DRIVE PROJECT NAME PROJECT NO. PROJECT LOCATION MAP:PROJECT LOCATION: North bank of Agua Hedionda Lagoon and Creek, from El Camino Real and Cannon Road intersection to the Kelly Drive/Cove Drive intersection. PROJECT DESCRIPTION: • Replace/rehabilitate 21 access holes. • Conduct environmental survey and prepare documents necessary to obtain permits. PROJECT NEED: Implementation of the project will avoid accidental sewage spill to the lagoon and creek, and reduce inflow to the sewer. FINANCING: Purpose Environmental/Design Construction Total Cost = Estimated Cost $9,000 $611,000 $620,000 Funding Source Sewer Replacement Sewer Replacement Naguaecr Page 104 CAPITAL PROJECT DESCRIPTION SEWER COLLECTION SYSTEM - NORTH AGUA HEDIONDA INTERCEPTOR REHABILITATION - WEST SEGMENT COVE DRIVE TO HOOVER STREET PROJECT NAME 35371 PROJECT NO. PROJECT LOCATION MAP: NAI_west • a i i i • t • i i i i t i I • PROJECT LOCATION: North bank of Agua Hedionda Lagoon and Creek, from Cove Drive to Hoover Street. PROJECT DESCRIPTION: • Design and construct access road and shoreline protection wall to facilitate gravity sewer maintenance from Cove Drive to Hoover Street. • Design and construct erosion protection for access road and existing gravity sewer where needed. • Replace 700 linear feet of 24-inch diameter sewerline. • Replace/rehabilitate 19 access holes. • Conduct environmental survey and prepare Environmental Impact Report necessary to obtain permits. • Design and construct mitigation site. PROJECT NEED: Implementation of the project will avoid accidental sewage spill to the lagoon and creek, reduce inflow to the sewer, and allow for maintenance vehicles to access the sewer. FINANCING: Purpose Study Environmental Property Acquisition Design Construction Estimated Cost $24,599 $829,808 $45,000 $199,916 $2,530,677 Funding Source Sewer Replacement Sewer Replacement Sewer Replacement Sewer Replacement Sewer Replacement Total Cost = $3,630,000 Annual Operating Cost = $5,000 Page 105 [ I (I i I i 1 II i I i r i i i f I l i i l I i i i i i CAPITAL PROJECT DESCRIPTION f i f i l i i i NONE SEWER COLLECTION SYSTEM - NORTH AGUA HEDIONDA TRUNK SEWER REACH NAHT1A PROJECT NAME PROJECT NO. PROJECT LOCATION MAP:PROJECT LOCATION: Along the north side of Tamarack Avenue from El Camino Real to Calavera Hills Treatment Plant. PROJECT DESCRIPTION: Remove existing forcemain and construct 5,000 feet of 8-inch diameter gravity sewer pipeline. PROJECT NEED: When the Calavera Hills Sewer Treatment Plant was initially constructed, there was no provision for extending a gravity sewer line downstream of the plant. When the decision was made not to activate the plant, the sewer mains discharging into the plant site were connected to force main pipe which was originally intended to carry flow up to the plant from projects located downstream of the plant. The existing force main is not sloped properly to handle gravity flow and lacks the necessary access holes for proper maintenance. Removal of the existing force main and construction of a new gravity line will complete this portion of the sewer master plan. FINANCING: Purpose Planning/Study Design Construction Admin/Inspection Total Cost = Estimated Cost Funding Source $58,000 $100,000 $1,375,200 $100,000 $1,633,200 Sewer Replacement Sewer Replacement Sewer Replacement Sewer Replacement NAHT1A Page 106 CAPITAL PROJECT DESCRIPTION 35381 SEWER COLLECTION SYSTEM - NORTH BATIQUITOS INTERCEPTOR REHABILITATION PROJECT NO. PROJECT NAME PROJECT LOCATION MAP:PROJECT LOCATION: North side of Batiquitos Lagoon from El Camino Real west to North Batiquitos Lift Station. PROJECT DESCRIPTION: During high rainfall periods, the Batiquitos Lagoon level rises to flood above the existing access road and access hole covers. The project will design a new access road to the sewer and raise access hole covers to a higher elevation where required. PROJECT NEED: To avoid accidental sewage spill, reduce inflow to the sewer, and allow for maintenance vehicles to access the sewer. FINANCING: Purpose Estimated Cost Funding Source Design Environmental Land Acquisition Construction Admin/Inspection Total Cost = $270,000 $80,000 $30,000 $620,000 $100,000 $1,100,000 Sewer Replacement Sewer Replacement Sewer Replacement Sewer Replacement Sewer Replacement Page 107 Nbatint • m t i i j i i I 1 i i i i i i i i I i i i r i i i i i i i i i i i i i i i f i i CAPITAL PROJECT DESCRIPTION i ! 38091 SEWER COLLECTION SYSTEM - NORTH BATIQUITOS SEWAGE LIFT STATION MODIFICATIONS PROJECT NAME PROJECT NO. PROJECT LOCATION MAP: PROJECT STE PROJECT LOCATION: End of Gabbiano Lane. PROJECT DESCRIPTION: Replace miscellaneous equipment damaged by corrosion. Provide structural modifications to dry well and wet well. Modify mechanical and electrical systems as needed to eliminate failures. Provide color study and necessary HVAC and odor control modifications. PROJECT NEED: Existing structure does not allow wet well to be cleaned out. Existing structure needs openings to allow lift station pumps to be removed. Existing electrical system needs to be modified to stop pumps from locking out unnecessarily. FINANCING: Purpose Design Construction Admin/Inspection Total Cost = Estimated Cost Funding Source $124,880 $429,120 $53,000 $607,000 Sewer Replacement Sewer Replacement Sewer Replacement Northbat Page 108 CAPITAL PROJECT DESCRIPTION SEWER COLLECTION SYSTEM - POINSETTIA LANE SEWER RELOCATION PROJECT NAME 38101 PROJECT NO. PROJECT LOCATION MAP:PROJECT LOCATION: Poinsettia Lane near railroad. PROJECT DESCRIPTION: Relocate 2,000 feet of 21" sewer. PROJECT NEED: The existing sewer facilities beneath the Poinsettia Lane bridge crossing the SDNRR are inaccessible and are difficult to maintain properly. The proposed widening of the Poinsettia Lane bridge improvements will exacerbate the problem. The proposed relocation project will be timed to coincide with the development of the adjacent Poinsettia Properties project to reduce costs and eliminate the need to pay for the necessary easements. FINANCING: Purpose Design Construction Total Cost = Estimated Cost Funding Source $100,000 $300,000 $400,000 Sewer Replacement Sewer Replacement Poin sew Page 109 II II II II II II II II I I I I I I 1 1 I i II II II II II II II II II CAPITAL PROJECT DESCRIPTION I I I I I 1 I ! I I 38751 SEWER COLLECTION SYSTEM - POINSETTIA SEWAGE LIFT STATION ODOR AND NOISE ABATEMENT PROJECT NO. PROJECT NAME PROJECT LOCATION MAP:PROJECT LOCATION: 2425 Poinsettia Lane - Poinsettia Sewage Lift Station. PROJECT DESCRIPTION: Installation of an activated carbon adsorption odor control system, including ducting, to treat foul air from the lift station wetwell to reduce corrosion and control odor emissions, and sound enclosures for outdoor fans. PROJECT NEED: The existing lift station emits odors that can reach future developments in close proximity to the lift station. In addition, uncovered supply and exhaust fans generate noise that reach or exceed 60 dBa at the fenceline. Control of the odors and reduction of noise will promote "good neighbor" policy and a higher level of service to adjacent residents. FINANCING: Purpose Environmental Design Construction Admin/Inspection Total Cost = Estimated Cost $6,000 $15,700 $200,100 $45,000 Funding Source Sewer Replacement Sewer Replacement Sewer Replacement Sewer Replacement $266,800 Annual Operating Cost = $11,000 Poinlift Page 110 CAPITAL PROJECT DESCRIPTION SEWER COLLECTION SYSTEM - REMOVAL OF EXISTING LIFT STATIONS PROJECT NAME NONE PROJECT NO. PROJECT LOCATION MAP: SIMSBURY /VILLAS FARADAY (LOWER) FARADAY •(UPPER) PROJECT LOCATION: • Gateshead • Vancouver • Simsbury • Villas • Woodstock • Faraday (upper) • Faraday (lower) PROJECT DESCRIPTION: Remove existing lift stations and construct new gravity sewer. PROJECT NEED: Identified in 2003 Sewer Master Plan Update. Removal of lift stations will reduce maintenance and operation costs. FINANCING: Purpose Design/Admin/lnsp Construction Total Cost = Estimated Cost Funding Source $100,000 $530,000 $630,000 Other Other Rem lift Page 111 ii •• ii ii ii ii ii ii ii ii • • • a • • • •• •• • II I i II II II iiiiiiiiiiiiiiiiii CAPITAL PROJECT DESCRIPTION 11 ii ii ii 38401 SEWER COLLECTION SYSTEM - SEWER LIFT STATION - MISCELLANEOUS REPAIRS & UPGRADES PROJECT NO. PROJECT NAME PROJECT LOCATION MAP: HWY78 PROJECT LOCATION: Villas, Terramar and Gateshead sewer lift stations. PROJECT DESCRIPTION: Repair and upgrade various sewer lift stations throughout the City. Repairs include replacing existing malfunctioning alarm dialers at the Home Plant and Villas Sewer Lift Stations; replacing old pumps at the Terramar, Villas and Gateshead Sewer Lift Stations; replacing existing gas monitoring units, and the wet well lining at the Villas Sewer Lift Station. PROJECT NEED: These projects are needed to properly maintain the existing sewer lift stations and prevent potential sewage spills. Many of the existing stations are 15 years or older and require periodic upgrades and/or replacement of pumps and electrical systems to increased maintenance costs. FINANCING: Purpose Design Construction Admin/Inspection Total Cost = Estimated Cost Funding Source $40,000 $195,380 $45,000 $280,380 Sewer Replacement Sewer Replacement Sewer Replacement Sewerlft Page 112 CAPITAL PROJECT DESCRIPTION SEWER COLLECTION SYSTEM - SEWER LINE REFURBISHMENT/REPLACEMENT PROJECT NAME 39271 PROJECT NO. PROJECT LOCATION MAP: VARIOUS LOCATIONS THROUGHOUT THE CITY PROJECT LOCATION: Various locations within the City sewer limits. PROJECT DESCRIPTION: Clean and refurbish existing sewer lines older than 30 years or replace if not able to refurbish. The sewer lines needing repair will be determined by yearly TV inspection. PROJECT NEED: Maintain system in good condition to avoid major problems. FINANCING: Estimated Cost Funding Source $5,100,000 Sewer Replacement $5,100,000 Purpose Design/Construction Total Cost = SEWERLNE.doc Page 113 • i ii ii •• 11 ii ii ii f i mm mm i • i • i • i • i i i • 11 11 I i f 1 I I iiiiiiiiiitiiiiiiiiiiiiiiii CAPITAL PROJECT DESCRIPTION ! I 1 I 1 NONE SEWER COLLECTION SYSTEM - MASTER PLAN/CONNECTION FEE UPDATE PROJECT NAME PROJECT NO. PROJECT LOCATION MAP: LOCATIONS THROUGHOUT THE CITY Mstrplan PROJECT LOCATION: Throughout the City. PROJECT DESCRIPTION: Update the City's 2003 Sewer Master Plan based on anticipated growth projections. PROJECT NEED: The Master Plan update will help identify the need for changes to planned facilities based on the timing of growth projections and Growth Management Standards. FINANCING: Purpose Report/Admin Total Cost = Estimated Cost Funding Source $320,000 Sewer Replacement $320,000 Page 114 CAPITAL PROJECT DESCRIPTION SEWER COLLECTION SYSTEM - SEWER MONITORING PROGRAM PROJECT NAME 39521 & 33241 PROJECT NO. PROJECT LOCATION MAP: N/A SEWERMON.doc PROJECT LOCATION: Citywide within the City's sewer service area. PROJECT DESCRIPTION: Monitor sewer flows and remaining capacities in lines and pump stations within the Carlsbad sewer service area. Perform sewer flow measurements when required. Update Sewer Master Plan and review adequacy of sewer fees as required. PROJECT NEED: To ensure that sewer flows do not exceed line capacity and to ensure timely upgrades of sewer systems in conformance with the Growth Management Standards. FINANCING: Purpose Monitoring Monitoring Total Cost = Estimated Cost Funding Source $200,475 $320,000 $520,475 Sewer Connection Sewer Replacement Page 115 II It II II II II J 1 II II II II •• i i i i i i i i i i i i I i i i i i i i i i i i i i i j I i i i I ! i i I i CAPITAL PROJECT DESCRIPTION 35831 & 38281 SEWER COLLECTION SYSTEM - SOUTH AGUA HEDIONDA LIFT STATION AND FORCE MAIN PROJECT NO. PROJECT NAME PROJECT LOCATION MAP:PROJECT LOCATION: Along Cannon Road from Armada Drive to El Camino Real. PROJECT DESCRIPTION: Construct 350 HP sewage lift station and force main in Cannon Road Reaches SAH1,SAH2,andSAH3. PROJECT NEED: To provide sewer service to those areas generally tributary to the south side of Agua Hedionda Lagoon. FINANCING: Purpose Estimated Cost Funding Source Planning, Permitting & Design $1,500,000 Sewer Benefit Area Fee Construction $7,327,415 Sewer Benefit Area Fee Total Cost = $8,827,415 Annual Operating Cost = $435,000 SOAGPHII Page 116 CAPITAL PROJECT DESCRIPTION SEWER COLLECTION SYSTEM - VISTA/CARLSBAD INTERCEPTOR AGUA HEDIONDA LIFT STATION (VC 12) PROJECT NAME 34921 PROJECT NO. PROJECT LOCATION MAP: SITE PROJECT LOCATION: On the south shore of Agua Hedionda Lagoon adjacent to the east side of the railroad tracks. PROJECT DESCRIPTION: Upgrade existing pump station to increase capacity for buildout conditions. Replace existing pumps with larger capacity pumps and associated appurtenances. Carlsbad shares the total cost of the project with the City of Vista at a 50/50% share. PROJECT NEED: Required to handle sewage flows for buildout population. FINANCING: Purpose Environmental Design Construction Estimated Cost Funding Source $508,800 $610,600 $5,130,600 Sewer Connection Fee Sewer Connection Fee Sewer Connection Fee Total Cost = $6,250,000 * Includes Vista's share of costs. Annual Operating Cost = $149,000 Agualift Page 117 I I I 1 I I I 1 I 1 I 1 I 1 I 1 r i r i i i i i i i I ! I I I i I I I I 1 I I I I I I I I I CAPITAL PROJECT DESCRIPTION I 1 f 1 I ! I I 38861 SEWER COLLECTION SYSTEM - VISTA/CARLSBAD INTERCEPTOR SEWER REACH VC11B PROJECT NO. PROJECT NAME PROJECT LOCATION MAP: PACIFIC OCEAN ENCINA WATER POLLUTION CONTROL FACILITY PROJECT LOCATION: Along NCTD railroad right-of-way from Olive Avenue south across Agua Hedionda Lagoon to the Agua Hedionda Lift Station. PROJECT DESCRIPTION: Replace existing Vista/Carlsbad Interceptor Sewer Reach VC11B and bridge (wood trestle) with 800 feet of 54-inch pipeline and a new concrete bridge. Project cost is shared with the City of Vista. PROJECT NEED: Required to handle buildout flows by replacing existing pipeline and the wood bridge. FINANCING: Purpose Environmental Design Property Acquisition Construction Estimated Cost Funding Source $100,000 $200,000 $14,000 $3,235,000 $3,549,000 Sewer Connection Fee Sewer Connection Fee Sewer Connection Fee Sewer Connection Fee Total Cost = *Cost includes Vista's share of costs. Annual Operating Cost = $568 SEWVC11B.doc Page 118 CAPITAL PROJECT DESCRIPTION 39491 SEWER COLLECTION SYSTEM - VISTA/CARLSBAD INTERCEPTOR SEWER REACHES VC13 TO VC15 PROJECT NO. PROJECT NAME PROJECT LOCATION MAP: PROJECT FACILITY PROJECT LOCATION: From the Agua Hedionda Lift Station south to the Encina Water Pollution Control Facility. PROJECT DESCRIPTION: Replace existing Vista/Carlsbad Interceptor Sewer Reaches VC13 to VC15 with a 54" pipeline. Project cost is shared with the City of Vista. PROJECT NEED: Required to handle buildout flows and deteriorated pipelines. FINANCING: Purpose Estimated Cost Funding Source Design Construction Total Cost = $700,000 Sewer Connection Fees $9,500,000 Sewer Connection Fees $10,200,000 * *Cost includes Vista's share. VC13VC15.doc Page 119 • • •• II II II I I i r i r i i i i i t i i i i \ t i t i i § i i i i i i i i i i i i i i i i CAPITAL PROJECT DESCRIPTION 31821 & 31822 SEWER COLLECTION SYSTEM - VISTA/CARLSBAD INTERCEPTOR SEWER REACHES VC5A.5B TO 11A PROJECT NO. PROJECT NAME PROJECT LOCATION MAP: PROJECT PROJECT LOCATION: Along Jefferson Street from Interstate 5 to Oak Avenue, along Oak Avenue from Jefferson Street to the west side of the railroad right-of-way, along the railroad right-of-way from Oak Street to the Agua Hedionda Lagoon. The project also includes a spur line connection along Chestnut Avenue from the railroad right-of-way to Harding Street. PROJECT DESCRIPTION: Replace the existing Vista/Carlsbad Interceptor Sewer from Reaches VC5 to VC11A with a new 36" to 78" diameter pipeline. Project cost is shared with the City of Vista. PROJECT NEED: Required to handle buildout flows and to replace deteriorated pipeline. FINANCING: Purpose Design/Construction Total Cost = * Cost includes Vista's share. Estimated Cost Funding Source $12,223,433 $702,020 $12,925,453 * Sewer Connection Fee Sewer Replacement VC SEWER.doc Page 120 CAPITAL PROJECT DESCRIPTION SEWER COLLECTION SYSTEM - VISTA/CARLSBAD INTERCEPTOR SEWER REHABILITATION REACHES 1 THRU 3 PROJECT NAME 39501 & 38671 PROJECT NO. PROJECT LOCATION MAP: PROJECT PROJECT LOCATION: Reaches 1, 2 and 3 of the Vista/Carlsbad Interceptor Sewer located south of Highway 78 from Jefferson Street to the City limits. PROJECT DESCRIPTION: Reaches 1, 2 and 3 of the Vista/Carlsbad (V/C) 36" Ductile Iron Interceptor and manholes have corroded significantly. VC1 and 2 will be lined with PVC and manholes will be rehabilitated. VC3 will be completely replaced. V/C interceptor is jointly owned by the City of Vista and the City of Carlsbad. Through a joint City agreement, Carlsbad is responsible for 15% of the cost for maintenance and improvements to Reaches 1, 2 and 3. The City of Vista is responsible for managing projects within these reaches. Costs below reflect the City of Carlsbad's share of project. PROJECT NEED: Increase safety: Pipeline and manholes have been determined to be in poor condition. Risk of pipeline failure and sewage spill in environmentally sensitive area exists. Unmet needs: Manholes are currently unlined. Concrete is exposed to hydrogen sulfide environment. Lining will increase longevity of the manhole. Lining of pipeline will reduce ground water infiltration into the wastewater system. FINANCING: Purpose Design Construction Construction Estimated Cost Funding Source $32,940 $719,135 $2,570,000 Sewer Replacement Sewer Replacement Sewer Connection Total Cost = $3,322,075 * *Cost includes Administration and Inspection costs. VCinterc Page 121 I I II II II II II II II II • I WA TER PROJECTS f i I i ! i I i t i I i I i r i i i i i t i f i t i i i i i i i i i r i I i WATER DISTRIBUTION SYSTEM PROJECTS FUNDING MATRIX FOR WATER DISTRIBUTION SYSTEM PROJECTS PROJ NO. 33762 33761 39541 NEW 38421 NEW NEW 38921 NEW 36631 39551 NEW 34461 NEW 38441 38431 39111 39121 38161 39131 NEW 36223 NEW 39031 38211 NEW NEW NEW NEW NEW 39041 38231 38221 35311 34791 PROJECT TITLE "D" RESERVOIR - PHASE II "D" RESERVOIR - PHASE II "D" RESERVOIR - BLACK RAIL ROAD IMPROVEMENTS AVIARA PARKWAY AT PLUM TREE CALAVERA HILLS WATER BOOSTER STATION STANDBY GENERATO CANNON ROAD EAST OF EL CAMINO REAL CARLSBAD BOULEVARD - SOUTH OF AVENIDA ENCINAS COLLEGE BLVD - CANNON ROAD TO CARLSBAD VILLAGE DRIVE COLLEGE BOULEVARD - CANNON TO BADGER LANE COLLEGE BOULEVARD (16' LINE TO CANNON ROAD) COLLEGE BLVD-MAERKLE RESERVOIR TO AGUA HEDIONDA CREEK CRESTVIEW DRIVE TRANSMISSION MAIN DEMOLITION OF WATER FACILITIES AT PAJAMA DRIVE DESALINATION GROUNDWATER/SEAWATER STUDY EL CAMINO REAL - PALOMAR AIRPORT ROAD SOUTH EL CAMINO REAL BETWEEN COLLEGE AND JACKSPAR EL CAMINO REAL CROSSING AT KELLY DRIVE EL CAMINO REAL TRANSMISSION MAIN - LISA ST TO KELLY DR EL CAMINO REAL TRANSMISSION MAIN FROM FARADAY TO COUGAf EL CAMINO REAL/CARLSBAD VILLAGE DR PIPELINE REPLACEMENT EL FUERTE - NORTH OF LOKER EL FUERTE - ALGA ROAD TO POINSETTIA LANE EL FUERTE - POINSETTIA LANE TO PALOMAR AIRPORT ROAD EL FUERTE AND CORINTIA STREET FARADAY AVENUE - ORION TO MELROSE WATERLINE FARADAY AVENUE EXTENSION FOUSSAT ROAD WELL ABANDONMENT LAKE CALAVERA RESERVOIR IMPROVEMENTS MAERKLE PUMP STATION IMPROVEMENTS MAERKLE PUMP STATION IMPROVEMENTS MAERKLE RESERVOIR STORAGE (TAP #2) MARRON RD - PRESSURE REGULATING STATION TO OCEANSIDE MASTER PLAN UPDATE MELROSE DRIVE - PALOMAR AIRPORT ROAD TO FARADAY MISCELLANEOUS PIPELINE REPLACEMENT PROJECTS MISCELLANEOUS STORAGE TANK REPAIRS MISCELLANEOUS WATER RESERVOIR FENCING OCEANSIDE INTERTIE UPGRADE PALOMAR AIRPORT - NORTH OF OWENS FUNDING SOURCE WATER CONN WATER REPL WATER REPL WATER REPL WATER CONN WATER CONN WATER REPL WATER CONN WATER CONN WATER CONN WATER REPL WATER REPL WATER REPL WATER REPL WATER REPL WATER CONN WATER CONN WATER CONN WATER REPL WATER REPL WATER CONN WATER CONN WATER CONN WATER REPL WATER CONN WATER CONN WATER REPL WATER REPL WATER CONN WATER REPL WATER CONN WATER CONN WATER CONN WATER CONN WATER REPL WATER REPL WATER REPL WATER REPL WATER CONN TOTAL BUDGET 5,163,800 1 ,721 ,200 182,500 397,000 405,000 687,400 765,500 700,000 645,200 421,000 2,762,100 130,000 60,000 649,860 3,225,000 624,900 94,000 214,300 710,000 50,000 148,750 2,000,000 1,141,000 135,000 97,210 647,600 202,500 2,675,000 675,000 675,000 11,475,000 618,000 43,200 719,500 1,655,900 170,000 110,000 100,000 150,000 YEAR OF SERVICE FUTURE YEAR BUDGET AMOUNTS YEAR1 2004-2005 182,500 60,000 321 ,000 52,500 280,000 96,988 YEAR 2 2005-2006 50,000 687,400 421,000 30,000 94,000 164,300 400,000 145,500 100,000 YEAR 3 2006-2007 355,000 100,000 400,000 YEAR 4 2007-2008 397,000 645,200 647,600 719,500 255,900 YEARS 2008-2009 765,500 135,000 11,475,000 YEAR 6-10 2010-2014 5,163,800 1,721,200 649,860 675,000 675,000 618,000 43,200 BUILDOUT 2015-2020 2,762,100 624,900 Page 122 • 1 II • 1 II II II II I I I 1 I I C 1 I I I I I I f ! ( 1 I ! f i i i i \ i i i i i FUNDING MATRIX FOR WATER DISTRIBUTION SYSTEM PROJECTS PROJ NO. 39102 39101 35851 NEW NEW NEW NEW NEW 36581 NEW 38781 38581 39231 39561 39151 38531 39001 36641 PROJECT TITLE PAR/ECR PUMP STATION PAR/ECR PUMP STATION POINSETTIA LANE - EL CAMINO REAL TO "D" RESERVOIR POINSETTIA LANE - EL CAMINO REAL TO SKIMMER COURT POINSETTIA LANE - SKIMMER COURT TO CASSIA POINSETTIA LANE - SKIMMER COURT TO CASSIA POINSETTIA LANE EAST OF BLACK RAIL ROAD 12" POINSETTIA LANE EAST OF BLACK RAIL ROAD 12" POINSETTIA LANE - FROM 'D" RESERVOIR TO AMBROSIA LANE PRESSURE REDUCING STATION - SYCAMORE CREEK PRESSURE REGULATING STATION - CANNON AND COLLEGE RANCHO CARRILLO OVERSIZING/EXTENSION RANCHO SANTA FE RD. PIPELINE REPLACEMENT (PROJECT 39071) SAN MARCOS BLVD. PIPELINE REPLACEMENT (PAR w/o SDCWA) TANGLEWOOD PRESSURE REDUCING STATION REPLACEMENT TAP RESERVOIR EXTERIOR PAINTING WATER OPERATIONS WATER PUMP PROJECT WATER SYSTEM INTERTIE CONNECTION FUNDING SOURCE WATER CONN WATER REPL WATER CONN WATER CONN WATER REPL WATER CONN WATER CONN WATER REPL WATER CONN WATER CONN WATER CONN WATER CONN WATER REPL WATER REPL WATER REPL WATER REPL WATER REPL WATER REPL TOTAL BUDGET 607,500 607,500 2,700,000 203,100 394,000 309,000 185,700 185,600 322,000 101,300 250,000 90,000 773,000 2,656,000 300,000 120,000 55,000 400,000 YEAR OF SERVICE FUTURE YEAR BUDGET AMOUNTS YEAR1 2004-2005 532,500 532,500 2,656,000 100,000 YEAR 2 2005-2006 YEAR 3 2006-2007 YEAR 4 2007-2008 YEARS 2008-2009 YEAR 6-10 2010-2014 203,100 394,000 309,000 185,700 185,600 101,300 BUILDOUT 2015-2020 Page 123 PROJECT LOCATION MAP: CAPITAL PROJECT DESCRIPTION WATER DISTRIBUTION SYSTEM - "D" RESERVOIR PHASE PROJECT NAME 33761 & 33762 PROJECT NO. PROJECT LOCATION: Adjacent to existing "D" Reservoir. PROJECT DESCRIPTION: Construct new 8.5 MG water reservoir to service 375 Zone. PROJECT NEED: Provide additional daily storage within the distribution system for ultimate demands. FINANCING: Purpose Construction Construction Total Cost = Estimated Cost Funding Source $5,163,800 $1,721,200 $6,885,000 Water Connection Water Replacement D Resll Page 124 • Iflilllflfllltl I ! I I I I I I I I I I I 1 f ! I S I I I I I I I I i I I I I I I ! I I I ! CAPITAL PROJECT DESCRIPTION 39541 WATER DISTRIBUTION SYSTEM PROJECTS - "D" RESERVOIR - BLACK RAIL ROAD IMPROVEMENTS PROJECT NO. PROJECT NAME PROJECT LOCATION MAP: PROJECT PROJECT LOCATION: Black Rail Road segment adjacent to "D" Tank Reservoir. PROJECT DESCRIPTION: Black Rail Road improvements include paving, base, sidewalks, curb and gutter, grading, retaining wall, and undergrounding of existing utilities. PROJECT NEED: The Black Rail Road improvements fronting the "D" Tank Reservoir are required by CUP 03-15. FINANCING: Purpose Design Construction Admin/Inspection Total Cost = Estimated Cost $28,000 $130,000 $24,500 $182,500 Funding Source Water Replacement Water Replacement Water Replacement Blackrail Page 125 CAPITAL PROJECT DESCRIPTION PROJECT LOCATION MAP: WATER DISTRIBUTION SYSTEM - AVIARA PARKWAY PROJECT NAME PROJECT NO. #19 PROJECT LOCATION: Aviara Parkway at Plum Tree, north to Mariposa Street, then east to Sapphire Drive. PROJECT DESCRIPTION: Construct 3,100 feet of 8-inch watermain. PROJECT NEED: Provide redundant supply to residential development. FINANCING: Purpose Estimated Cost Funding Source Construction Adm/Design/lnsp Total Cost = $300,000 $97,000 $397,000 Water Replacement Water Replacement Aviara Page 126 II f 1 I I II f 1 I I f I I 1 fllillllflflfllllili CAPITAL PROJECT DESCRIPTION 1 I 1 I I ! I I 1 ! 38421 WATER DISTRIBUTION SYSTEM - CALAVERA HILLS WATER BOOSTER STATION STANDBY GENERATOR PROJECT NAME PROJECT NO. PROJECT LOCATION MAP: \ CITY OF OCEANSIDE J X/LAKE CALAVERA PROJECT SITE PROJECT LOCATION: College Boulevard at Carlsbad Village Drive. PROJECT DESCRIPTION: Furnish and install standby generator and generator building at Calavera Hills Booster Pump Station. PROJECT NEED: The existing booster station at this location does not have backup power. If an electrical power outage occurs, the pump station will not operate. The addition of a permanent generator at this facility will increase reliability in accordance with Council goals. FINANCING: Purpose Design/Adm/lnsp Construction Total Cost = Estimated Cost Funding Source $105,000 $300,000 $405,000 Water Connection Water Connection Calhills Page 127 CAPITAL PROJECT DESCRIPTION WATER DISTRIBUTION SYSTEM - CANNON ROAD EAST OF EL CAMINO REAL PROJECT NAME PROJECT LOCATION MAP: PROJECT NO. #9 PROJECT LOCATION: In Cannon Road from Merwin Drive east to intersection with College Boulevard. PROJECT DESCRIPTION: Construct 4,400 feet of 12-inch watermain. PROJECT NEED: Provides water supply for new development and creates 375 Zone loop east of El Camino Real. FINANCING: Purpose Construction Adm/Design/lnsp Total Cost = Estimated Cost Funding Source $512,400 Water Connection $175,000 Water Connection $687,400 Cannon2 Page 128 • I II II II II II II II II II •• • • II II II II II II II rifiiiiiiitifififififiiiiitiiiiiiifiti CAPITAL PROJECT DESCRIPTION WATER DISTRIBUTION SYSTEM - CARLSBAD BOULEVARD SOUTH OF AVENIDA ENCINAS PROJECT NO. PROJECT NAME PROJECT LOCATION MAP: #22 PROJECT LOCATION: Carlsbad Boulevard from Avenida Encinas south to District boundary. PROJECT DESCRIPTION: Construct 4,900 feet of 12-inch watermain. PROJECT NEED: Provides a two-way emergency connection with San Diego Water District 240 Zone. Can also supply water to 318 Zone west of I-5. FINANCING: Purpose Construction Adm/Design/lnsp Total Cost = Estimated Cost Funding Source $565,500 Water Replacement $200,000 Water Replacement $765,500 Cbadblv2 Page 129 CAPITAL PROJECT DESCRIPTION WATER DISTRIBUTION SYSTEM - COLLEGE BOULEVARD FROM CANNON ROAD TO CARLSBAD VILLAGE DRIVE PROJECT NAME 38921 PROJECT NO. PROJECT LOCATION MAP: LAKE CALAVERA PROJECT LOCATION: College Boulevard from future Cannon Road to Carlsbad Village Drive. PROJECT DESCRIPTION: Install 6,330 linear feet of 16-inch line and a pressure regulating station. (In 490-446 H.G. Zone) PROJECT NEED: To meet the future demands of the area by increasing supply capacity to 446 Zone from Maerkle Reservoir. Developer to pay 50% of the cost. FINANCING: Purpose Estimated Cost Funding Source Design/Construction $700,000 Water Connection Fee Design/Construction $550,000 * Other - Developer Total Cost =$1,250,000 *Developer cost not shown in CIP schedules. COLLEGES Page 130 II II 11 II I 1 II II II II tiiiiiiiiiiiiiiifififiiiiiiitiiifififi CAPITAL PROJECT DESCRIPTION WATER DISTRIBUTION SYSTEM - COLLEGE BOULEVARD - CANNON ROAD TO BADGER LANE PROJECT NO. PROJECT NAME PROJECT LOCATION MAP: PROJECT #8 PROJECT LOCATION: College Boulevard from Cannon Road south to Badger Lane. PROJECT DESCRIPTION: Construct 4,130 feet of 12-inch watermain. PROJECT NEED: Provides water supply for new development and creates 375 Zone loop east of El Camino Real. FINANCING: Purpose Construction Adm/Design/lnsp Total Cost = Estimated Cost Funding Source $500,000 Water Connection $145,200 Water Connection $645,200 College Page 131 CAPITAL PROJECT DESCRIPTION NONE WATER DISTRIBUTION SYSTEM - COLLEGE BOULEVARD (16" LINE TO CANNON ROAD) PROJECT NO. PROJECT NAME PROJECT LOCATION MAP: LAKE CALAVERA #7 PROJECT LOCATION: College Boulevard from 400' north of El Camino Real northerly to future Cannon Road. PROJECT DESCRIPTION: Install 4,000 LF of 16-inch line. (In 490 H.G. Zone) PROJECT NEED: To meet the future demands of the area from LFMP Zones 14 and 15. Developer to pay 50% of cost. FINANCING: Purpose Design/Construction Design/Construction Total Cost = Estimated Cost Funding Source $421,000 $421,000 $842,000 Water Connection Fee Other - Developer 'Developer cost not shown in CIP schedules. Colleges Page 132 || f| I] II (I II II tl II II II II II II II II II II II i ii i i i i I I i i I i i i r i I i I I I I I I CAPITAL PROJECT DESCRIPTION fill i i i j 36631 WATER DISTRIBUTION SYSTEM - COLLEGE BOULEVARD MAERKLE RESERVOIR TO AGUA HEDIONDA CREEK PROJECT NAME PROJECT NO. PROJECT LOCATION MAP: FARAI PROJECT LOCATION: From Maerkle Reservoir west to the future extension of College Boulevard. PROJECT DESCRIPTION: Install 9,300 LF of 36-inch waterline. (In 490 H.G. Zone). PROJECT NEED: Increase supply from Maerkle Reservoir and provide redundant supply pipeline. Supply to new 490 Zone development east of El Camino Real. FINANCING: Purpose Design/Adm/lnsp Construction Total Cost = Estimated Cost $662,100 $2,100,000 $2,762,100 Funding Source Water Replacement Water Replacement Maerkle2 Page 133 CAPITAL PROJECT DESCRIPTION WATER DISTRIBUTION SYSTEM - CRESTVIEW DRIVE TRANSMISSION MAIN PROJECT NAME NONE PROJECT NO. PROJECT LOCATION MAP: 'PROJECT PROJECT LOCATION: Crestview Drive west of El Camino Real. PROJECT DESCRIPTION: Construct 600 feet of 8-inch diameter pipeline. PROJECT NEED: To provide a redundant water supply to existing residential area. FINANCING: Purpose Estimated Cost Funding Source Design Construction Total Cost = $30,000 $100,000 $130,000 Water Replacement Water Replacement No_agua Page 134 II II 11 fl 11 II II II f • II II 11 II II II II f I I 1 I I I 1 I I I I I I I ! I I I 1 I I I I I I CAPITAL PROJECT DESCRIPTION I I I i I I I ! I l I 1 39551 WATER DISTRIBUTION SYSTEM - DEMOLITION OF WATER FACILITIES AT PAJAMA DRIVE PROJECT NAME PROJECT NO. PROJECT LOCATION MAP: Project Site PROJECT LOCATION: Corner of Pajama Drive and Mesa Boulevard in the City of Oceanside. PROJECT DESCRIPTION: Remove an existing abandoned surge tank and a control building. PROJECT NEED: Facilities were abandoned in 1971 when Carlsbad began using imported water and quit pumping from the San Luis Rey River Valley. FINANCING: Purpose Estimated Cost Funding Source Construction $40,000 Admin/Design/Inspection $20,000 Water Replacement Water Replacement Total Cost =$60,000 Pajamadr Page 135 CAPITAL PROJECT DESCRIPTION NONE WATER DISTRIBUTION SYSTEM - DESALINATION GROUNDWATER/SEAWATER STUDY PROJECT NO. PROJECT NAME PROJECT LOCATION MAP: N/A PROJECT LOCATION: Not Applicable. PROJECT DESCRIPTION: Preparation of a report investigating various methods of treating City owned groundwater located in the San Luis aquifer in Oceanside and identifying conveyance methods to transport the treated water to Carlsbad. Also included is a study of the feasibility of constructing a seawater desalination plant and identifying potential sites upon which to construct a desalination plant. PROJECT NEED: To develop supplemental source of water. FINANCING: Purpose Planning Study Total Cost = Estimated Cost $649,860 $649,860 Funding Source Water Replacement DESALINA Page 136 11 11 II II II II II 11 1119 i i f i i i ii i i II II I! II II II Ii II I CAPITAL PROJECT DESCRIPTION i 11 ii i i ii ii 34461 WATER DISTRIBUTION SYSTEM - EL CAM1NO REAL fPALOMAR AIRPORT ROAD SOUTH) PROJECT NAME PROJECT LOCATION MAP: PALOMAR PROJECT NO. #16 PROJECT LOCATION: El Camino Real - Palomar Airport Road South 6,100 LF. PROJECT DESCRIPTION: Replace 20" steel water line in El Camino Real South 6,100 LF with a new 24-inch water line. PROJECT NEED: Replacing old steel water line to avoid high maintenance costs and extend pipeline to new Poinsettia Lane road alignment. FINANCING: Purpose Design Construction Admin/Inspection Total Cost = Estimated Cost $305,000 $2,620,000 $300,000 $3,225,000 Funding Source Water Replacement Water Replacement Water Replacement ECRPARSO Page 137 CAPITAL PROJECT DESCRIPTION WATER DISTRIBUTION SYSTEM - EL CAMINO REAL BETWEEN COLLEGE & JACKSPAR PROJECT NO. PROJECT NAME PROJECT LOCATION MAP: #4 PROJECT LOCATION: Jackspar Drive from Longfellow to El Camino Real, south on El Camino Real to College Boulevard, and northeast on College Boulevard to Badger Lane. PROJECT DESCRIPTION: Construct 4,000 feet of 12-inch watermain. PROJECT NEED: Connects isolated portions of 375 Zone and provides for supply from Maerkle Reservoir for existing and future development. FINANCING: Purpose Construction Adm/Design/lnsp Total Cost = Estimated Cost Funding Source $462,900 $162,000 $624,900 Water Connection Water Connection Coll ECR Page 138 • I II II II II II II II II I 1 i i i i i i i i i i iiii 11 11 11 ii 11 tiii CAPITAL PROJECT DESCRIPTION i i i i r i i i NONE WATER DISTRIBUTION SYSTEM - EL CAMINO REAL CROSSING AT KELLY DRIVE PROJECT NAME PROJECT LOCATION MAP: PROJECT NO. #31 PROJECT LOCATION: El Camino Real at Kelly Drive. PROJECT DESCRIPTION: Install 300 LF of 12" line. (In 490 H.G. Zone) PROJECT NEED: To meet the future demands of the area. Increase supply to 255 Zone directly from 490 Zone through Kelly Pressure Reducing Station. FINANCING: Purpose Design/Construction Total Cost = Estimated Cost $94,000 $94,000 Funding Source Water Connection ECRCROSS Page 139 CAPITAL PROJECT DESCRIPTION WATER DISTRIBUTION SYSTEM - EL CAMINO REAL TRANSMISSION MAIN LISA STREET TO KELLY DRIVE PROJECT NAME 38441 PROJECT LOCATION MAP: PROJECT NO. #3 PROJECT LOCATION: El Camino Real from Lisa Street to Kelly Drive. PROJECT DESCRIPTION: Construct 2,000 feet of 10-inch diameter pipeline from Lisa Street to Kelly Drive. PROJECT NEED: To provide a looping water pipeline in the area. Needed to meet master plan requirements and increase reliability. FINANCING: Purpose Design/Adm/lnsp Construction Total Cost = Estimated Cost Funding Source $50,000 $164,300 $214,300 Water Connection Water Connection ECR Iran Page 140 11 ii ii ii 11 fi ii ii 11 ii ii ii •• ii i i ii i I I I I I I i i I I I i i 1 i i I l I i I I I i i i i CAPITAL PROJECT DESCRIPTION 1 I ! ! 1 I I f I I I 38431 WATER DISTRIBUTION SYSTEM - EL CAMINO REAL TRANSMISSION MAIN FROM FARADAY AVENUE TO COUGAR DRIVE PROJECT NAME PROJECT NO. PROJECT LOCATION MAP: PROJECT PROJECT LOCATION: El Camino Real from Faraday Avenue north to Cougar Drive and pressure reducing station north side of Faraday Avenue. PROJECT DESCRIPTION: Construction of 1,500 feet of 30-inch diameter transmission main and pressure reducing station. PROJECT NEED: Larger diameter pipe reduces pressure loss during emergency supply to 550 Zone from Maerkle Reservoir. FINANCING: Purpose Design Construction Total Cost = Estimated Cost $50,000 $660,000 $710,000 Funding Source Water Replacement Water Replacement ECRTRANS Page 141 CAPITAL PROJECT DESCRIPTION WATER DISTRIBUTION SYSTEM - EL CAMINO REAL/CARLSBAD VILLAGE DRIVE WATER PIPELINE REPLACEMENT PROJECT NAME 39111 PROJECT NO. PROJECT LOCATION MAP: PROJECTSITE PROJECT LOCATION: El Camino Real at Carlsbad Village Drive. PROJECT DESCRIPTION: Replace 200 feet of existing 10-inch diameter water pipeline crossing El Camino Real at Carlsbad Village Drive. The pipeline shall be replaced between existing pressure reducing stations. Existing pipeline cannot be repaired. PROJECT NEED: Existing pipeline has corroded and cannot be repaired because of depth and interference with existing storm drain. This pipeline supplies water to an existing pressure reducing station supplying water to the 330 pressure zone. Replacing this pipeline will ensure water redundancy and reliability in the services area. FINANCING: Purpose Design Construction Total Cost = Estimated Cost $15,000 $35,000 $50,000 Funding Source Water Replacement Water Replacement ECFLCVD Page 142 • i i i i i i i i r i i i i i i I i i E i i i i i i i t i I I I 1 I 1 I ! I ! f 1 E 1 t 1 CAPITAL PROJECT DESCRIPTION I I I \ 1 1 I 1 I ! 39121 WATER DISTRIBUTION SYSTEM - EL FUERTE (NORTH OF LOKER) PROJECT NAME PROJECT LOCATION MAP: PROJECT PROJECT NO. #13 PROJECT LOCATION: El Fuerte Avenue between Loker north to future Faraday Avenue. PROJECT DESCRIPTION: Install 2,200 LF of 16-inch line. (In 700-550 H.G. Zone). PROJECT NEED: To meet the future demands of the area. Developer to pay 75% of the cost. Provides looped supply to new North 700 Zone. FINANCING: Purpose Design/Construction Design/Construction Total Cost = Estimated Cost Funding Source $148,750 $246,900 $395,650 Water Connection Fee Other - Developer *Developer cost not shown in CIP schedules. ELFUERT5 Page 143 CAPITAL PROJECT DESCRIPTION WATER DISTRIBUTION SYSTEM - EL FUERTE (ALGA ROAD TO POINSETTIA LANE) PROJECT NAME 38161 PROJECT NO. PROJECT LOCATION MAP:PROJECT LOCATION: Future El Fuerte from Alga Road to Poinsettia Lane. PROJECT DESCRIPTION: Install 5,050 LF of 30-inch line and a pressure regulating station. (In 700 H.G. Zone). PROJECT NEED: To meet the future demands of the area. FINANCING: Estimated Cost Funding Source $2,000,000 Water Connection Fee $2,000,000 Purpose Design/Construction Total Cost = ELFUERTE Page 144 I • II fl II El II II El II It f I I • CAPITAL PROJECT DESCRIPTION 39131 WATER DISTRIBUTION SYSTEM - EL FUERTE (POINSETTIA LANE TO PALOMAR AIRPORT ROAD) PROJECT NO. PROJECT NAME PROJECT LOCATION MAP: I #15 PROJECT LOCATION: Future El Fuerte south of Palomar Airport Road. PROJECT DESCRIPTION: Install 5,200 LF of 24-inch line. PROJECT NEED: To meet the future demands of the area. Connects 700 North and 700 South pressure zones. FINANCING: Purpose Design/Adm/lnsp Construction Total Cost = Estimated Cost Funding Source $291,000 $850,000 $1,141,000 Water Connection Fee Water Connection Fee ELFUERT4 Page 145 CAPITAL PROJECT DESCRIPTION WATER DISTRIBUTION SYSTEM - EL FUERTE AND CORINTIA STREET PROJECT NAME PROJECT LOCATION MAP: PROJECT SITE PROJECT NO. #21 PROJECT LOCATION: Intersection of El Fuerte and Corintia Street. PROJECT DESCRIPTION: Construct Pressure Reducing Station. PROJECT NEED: Provide redundant water supply to 680,580 South and 510 Zones. FINANCING: Purpose Estimated Cost Funding Source Construction Adm/Design/lnsp Total Cost = $100,000 $35,000 $135,000 Water Replacement Water Replacement EIFuert3 Page 146 • if i i i i i r i i i i i i i i i i i i • I 1 I ! I 1 I I I I I I I 1 I J t I I I I I I 1 I 1 I 1 I 1 ! 1 I CAPITAL PROJECT DESCRIPTION ! I I I WATER DISTRIBUTION SYSTEM - FARADAY AVENUE EXTENSION PROJECT NAME PROJECT LOCATION MAP: PROJECT NO. #14 PROJECT LOCATION: In future Faraday Avenue extension between El Fuerte and Melrose Avenue. PROJECT DESCRIPTION: Construct 3,600 feet of 16-inch watermain. PROJECT NEED: Provides looped study to LFMZ Zone 16 and supply to 550 Zone from 700 to 550 PRV. FINANCING: Purpose Construction Adm/Design/lnsp Total Cost = Estimated Cost Funding Source $480,600 $167,000 $647,600 Water Connection Water Connection Faraday Page 147 CAPITAL PROJECT DESCRIPTION WATER DISTRIBUTION SYSTEM - FOUSSAT ROAD WELL ABANDONMENT PROJECT NAME 39031 PROJECT NO. PROJECT LOCATION MAP:PROJECT LOCATION: Southeast corner of Foussat Road and Mission Avenue in Oceanside. PROJECT DESCRIPTION: Abandon well per State standards, remove pumps, valves, concrete structures and general restoration of property. PROJECT NEED: The existing well and equipment are not usable and must be properly removed. FINANCING: Estimated Cost Funding SourcePurpose Design Construction Total Cost = $40,000 $162,500 $202,500 Water Replacement Fund Water Replacement Fund Foussat Page 148 IB II ! 1 I i 1 ! I i II II II f 1 II II II ft II II I 1 I I f I iiiiiifiiiiififiiififi CAPITAL PROJECT DESCRIPTION i i i i i i i i i i 38211 WATER DISTRIBUTION SYSTEM - LAKE CALAVERA RESERVOIR IMPROVEMENTS PROJECT NAME PROJECT NO. PROJECT LOCATION MAP: PROJECT SITE CITY OF OCEANSIDE CTTYTF CARISBAB LAKE CALAVERA PROJECT LOCATION: Lake Calavera in the northeast quadrant of the City. PROJECT DESCRIPTION: Replace outlet tower valves and piping to restore function. Repair existing spillway and channel to improve flow, safety, and access. Upgrade existing access road and improve security with fencing and gates. PROJECT NEED: The existing valves located within the outlet tower have failed and water is presently draining from the reservoir and cannot be stopped. Left unrepaired, the lake will completely dry up and does not comply with dam safety requirements. The walkway structure to the outlet tower was removed due to safety issues, but direct access to the outlet structure needs to be restored for maintenance purposes. FINANCING: Purpose Environmental Design Construction Admin/Inspection Total Cost = Estimated Cost Funding Source $57,850 $404,800 $1,918,120 $294,230 $2,675,000 Water Replacement Water Replacement Water Replacement Water Replacement Lake cal Page 149 CAPITAL PROJECT DESCRIPTION WATER DISTRIBUTION SYSTEM - MAERKLE PUMP STATION PROJECT NAME PROJECT LOCATION MAP: PROJECT NO. #29(a) & (b) PROJECT LOCATION: Maerkle Reservoir. PROJECT DESCRIPTION: Enlarge pump station. PROJECT NEED: Required for emergency supply from Maerkle Reservoir. FINANCING: Purpose Estimated Cost Funding Source Construction Construction Total Cost = $675,000 $675,000 $1,350,000 Water Connection Water Replacement MaerkleS Page 150 II II II II I I II I ! I ! I I I 1 i i I i i } i i r ] i i i \ f i t i f i CAPITAL PROJECT DESCRIPTION i i i i i i i i WATER DISTRIBUTION SYSTEM - MAERKLE RESERVOIR STORAGE (TAP #2) PROJECT NAME PROJECT LOCATION MAP: PROJECT NO. #28 PROJECT LOCATION: Adjacent to Maerkle Reservoir. PROJECT DESCRIPTION: Construct buried 15 MG water storage reservoir next to existing Maerkle Reservoir. PROJECT NEED: Provides additional emergency storage to meet 10-day storage criteria based on ultimate demands. FINANCING: Purpose Construction Adm/Design/lnsp Total Cost = Estimated Cost Funding Source $10,000,000 $1,475,000 $11,475,000 Water Connection Water Connection Maerkle Page 151 CAPITAL PROJECT DESCRIPTION NONE WATER DISTRIBUTION SYSTEM - MARRON ROAD (PRESSURE REGULATING STATION TO OCEANSIDE) PROJECT NO. PROJECT NAME PROJECT LOCATION MAP:PROJECT LOCATION: Marron Road from Avenida de Anita easterly 6,600 feet. PROJECT DESCRIPTION: Install 6,600 LF of 12-inch line and two pressure regulating stations. Developer to pay 50% of cost. PROJECT NEED: To meet future demands in accordance with Growth Management Standards. Provide additional supply to 255 Zone. FINANCING: Purpose Estimated Cost Design/Construction $618,000 Design/Construction $618,000 Funding Source Water Connection Other - Developer Total Cost =$1,236,000 *Developer cost not included in CIP schedules. MARRONRD.doc Page 152 li ii iiii it it •* ft ii ii fi it • • mm I ! f 1 I I I I i i I i t ! f i t i I i i i i 1 i i f i CAPITAL PROJECT DESCRIPTION WATER DISTRIBUTION SYSTEM - MASTER PLAN UPDATE PROJECT NAME i I I I t I I 1 I ! NONE PROJECT NO. PROJECT LOCATION MAP: LOCATIONS THROUGHOUT THE CITY PROJECT LOCATION: Throughout the City. PROJECT DESCRIPTION: Update the CMWD's 2003 Water Master Plan based on anticipated growth projections and obtain necessary CEQA approval through an amendment to the EIR for adoption by City Council. PROJECT NEED: The Master Plan update will help identify the need for changes to planned facilities based on the timing of growth projections and Growth Management Standards. FINANCING: Study Total Cost = Estimated Cost $43,200 $43,200 Funding Source Water Connection Fee Mstrplan Page 153 CAPITAL PROJECT DESCRIPTION WATER DISTRIBUTION SYSTEM - MELROSE DRIVE PALOMAR AIRPORT ROAD TO FARADAY PROJECT NO. PROJECT NAME PROJECT LOCATION MAP: ROJECT #12 PROJECT LOCATION: Melrose Drive between Palomar Airport Road and Faraday Avenue. PROJECT DESCRIPTION: Construct 4,000 feet of 16-inch watermain. PROJECT NEED: Provide looped supply to new North 700 Zone in LFMZ Zone 16 business park. FINANCING: Purpose Estimated Cost Funding Source Construction Adm/Design/lnsp Total Cost = $533,000 Water Connection $186,500 Water Connection $719,500 Melrose Page 154 t i ii ii ii ii ii ii f i 11 li •• • »••ii II r i i \ i i i i I i I I I I I I I I I ! f i I 1 f I I I CAPITAL PROJECT DESCRIPTION i i l i f i f i 39041 WATER DISTRIBUTION SYSTEM - MISCELLANEOUS PIPELINE REPLACEMENTS PROJECT NAME PROJECT NO. PROJECT LOCATION MAP: CITYWIDE WTR_PIPE.doc PROJECT LOCATION: Various locations. PROJECT DESCRIPTION: Replace existing small diameter and older pipelines at 14 locations. PROJECT NEED: Provide increased water supply to meet fire flow requirements. FINANCING: Estimated CostPurpose Design Construction Admin/Inspection Total Cost = $150,000 $1,456,000 $49,900 $1,655,900 Funding Source Water Replacement Water Replacement Water Replacement Page 155 CAPITAL PROJECT DESCRIPTION WATER DISTRIBUTION SYSTEM - MISCELLANEOUS STORAGE TANK REPAIRS PROJECT NAME 38231 PROJECT NO. PROJECT LOCATION MAP: VARIOUS LOCATIONS Misctank PROJECT LOCATION: At various existing storage tank locations. PROJECT DESCRIPTION: Remove and replace deteriorated tank floor sections, ladders and appurtenances. Install cathodic protection systems. PROJECT NEED: Existing tanks have corrosion problems to rectify. FINANCING: Purpose Estimated Cost Funding Source Design Construction Total Cost = $20,000 $150,000 $170,000 Water Replacement Water Replacement Page 156 1 1 I 1 I 1 I 1 I 1 I I fl • 1 II 11 II II 11 II CAPITAL PROJECT DESCRIPTION i i r i i i 38221 WATER DISTRIBUTION SYSTEM - MISCELLANEOUS WATER RESERVOIR FENCING PROJECT NO. PROJECT NAME PROJECT LOCATION MAP: COSTA LO PROJECT LOCATION: At various water reservoir locations throughout the City as shown on the map including the TAP, "C", "E", Santa Fe II and La Costa Lo. PROJECT DESCRIPTION: Install protective fencing around the identified reservoir sites for safety and security purposes. PROJECT NEED: Project is required to protect the existing reservoir sites from vandalism and to ensure safety of the public. Ongoing development in the City has made these once isolated reservoir sites more accessible to the public thus intensifying the need for protective fencing. FINANCING: Purpose Construction Total Cost = Estimated Cost Funding Source $110,000 Water Replacement Fund $110,000 Reservoirs Page 157 CAPITAL PROJECT DESCRIPTION WATER DISTRIBUTION SYSTEM - OCEANSIDE INTERTIE UPGRADE PROJECT NAME 35311 PROJECT NO. PROJECT LOCATION MAP:PROJECT LOCATION: El Camino Real near State Highway 78. PROJECT DESCRIPTION: Make improvements to increase reliability of water system intertie with City of Oceanside. System supplies 5 cfs of treated water to Carlsbad. During emergencies and periods of water supply curtailment, the Oceanside intertie provides backup. PROJECT NEED: The system requires valve, pipe, and meter replacement. FINANCING: Purpose Estimated Cost Funding Source Design/Construction $100,000 Water Replacement Total Cost = $100,000 OSIDEINT Page 158 ••••iiiitiiiia I ! I 1 I I I I I 1 1 1 I I I 1 I } I } f 1 I 1 I I I 1 I 1 I 1 t ! CAPITAL PROJECT DESCRIPTION I f ! 34791 WATER DISTRIBUTION SYSTEM - PALOMAR AIRPORT (NORTH OF OWENS) PROJECT NAME PROJECT NO. PROJECT LOCATION MAP:PROJECT LOCATION: In Palomar Airport from Owens Place to Airport Road. PROJECT DESCRIPTION: Install 625 LF of 12" line. PROJECT NEED: To meet the future demands of the airport area and two-way feed. FINANCING: Purpose Estimated Cost Funding Source Design/Construction $150,000 Water Connection Fee Total Cost = $150,000 PALAIRPT Page 159 CAPITAL PROJECT DESCRIPTION WATER DISTRIBUTION SYSTEM - SAN MARCOS BLVD. PIPELINE REPLACEMENT PALOMAR AIRPORT ROAD WEST OF SAN DIEGO COUNTY WATER AUTHORITY (SDCWA) PROJECT NAME 39561 PROJECT LOCATION MAP: PROJECT NO. #26 PROJECT LOCATION: Palomar Airport Road west of the San Diego County Water Authority (SDCWA) Connection #1. PROJECT DESCRIPTION: Replace approximately 4,100 feet of existing 27-inch and 21-inch diameter steel waterline with new 30-inch steel watermain. PROJECT NEED: Reduce velocity and provide increased capacity from SDCWA #1 Connection to 700 Zone. In addition, both the 21 -inch and 27-inch pipes are over 40 years old and at the end of their service life. FINANCING: Purpose Design Construction Adm/lnsp Total Cost = Estimated Cost Funding Source $101,000 $2,435,000 $120,000 $2,656,000 Water Replacement Water Replacement Water Replacement PARwater Page 160 I I II II II II II II tl II II f • 11 • f I i 1 II 11 II r i i ? i i iiiiitiiificiiifirif CAPITAL PROJECT DESCRIPTION 39101 & 39102 WATER DISTRIBUTION SYSTEM - PALOMAR AIRPORT ROAD/EL CAMINO REAL PUMP STATION PROJECT NO. PROJECT NAME PROJECT LOCATION MAP: #20 PROJECT LOCATION: Intersection of Palomar Airport Road and El Camino Real. PROJECT DESCRIPTION: Grade site and construct a pump station to supply water from 490 pressure zone to 700 pressure zone. PROJECT NEED: To supply water from Maerkle Reservoir (490 pressure zone) to 700 pressure zone during emergencies and during routine maintenance of the imported water aqueducts. FINANCING: Purpose Construction Construction Total Cost = Estimated Cost $607,500 $607,500 $1,215,000 Funding Source Water Replacement Fee Water Connection Fee 700 ZONE Page 161 CAPITAL PROJECT DESCRIPTION WATER DISTRIBUTION SYSTEM - POINSETTIA LANE (EL CAMINO REAL TO "D" RESERVOIR) PROJECT NAME 35851 PROJECT NO. PROJECT LOCATION MAP: PKOJLCI SITE PROJECT LOCATION: Poinsettia Lane from Black Rail Road to El Camino Real. PROJECT DESCRIPTION: Install 5,800 LF of 12-inch line. PROJECT NEED: To meet the future demands of the area. Completes 375 Zone loop along Poinsettia Lane. Increases capacity to/from D3 Reservoir. FINANCING: Purpose Design/Adm/lnsp Construction Total Cost = Estimated Cost Funding Source $ 540,000 $2,160,000 $2,700,000 Water Connection Fee Water Connection Fee POINSET3 Page 162 •IllllJflflllfliJt • i i i i i i i i i i i i I I f i I i I i \ i i i i i i CAPITAL PROJECT DESCRIPTION WATER DISTRIBUTION SYSTEM - POINSETTIA LANE (EL CAMINO REAL TO SKIMMER COURT) PROJECT NAME { ! £ i I i I PROJECT LOCATION MAP: PROJECT NO. $25 PROJECT LOCATION: Poinsettia Lane from El Camino Real to Skimmer Court. PROJECT DESCRIPTION: Install 1,300 LF of 12-inch line. (In 375 H.G. Zone). PROJECT NEED: Parallel existing 8-inches to increase capacity in the 375 Zone and supply from 550 Zone. FINANCING: Purpose Design/Adm/lnsp Construction Total Cost = Estimated Cost Funding Source $50,000 $153,100 $203,100 Water Connection Fee Water Connection Fee POINSET2.doc Page 163 CAPITAL PROJECT DESCRIPTION WATER DISTRIBUTION SYSTEM - POtNSETTIA LANE (SKIMMER COURT TO CASSIA ROAD) PROJECT NO. PROJECT NAME PROJECT LOCATION MAP: #17 PROJECT LOCATION: In Poinsettia Lane between Skimmer Court and Cassia Road. PROJECT DESCRIPTION: Construct 4,500 feet of 12-inch watermain. PROJECT NEED: Completes 375 Loop on Poinsettia Lane. Increase capacity to/from D3 Reservoir. FINANCING: Purpose Construction Construction Total Cost = Estimated Cost Funding Source $309,000 $394,000 $703,000 Water Connection Water Replacement Poinskim Page 164 I I || II I J I I f I II II II II € • II II II II II II II II 11 II 1 i 11 I I I I I \ I ! I } t 1 I 1 f 1 CAPITAL PROJECT DESCRIPTION I ! I I I ! I WATER DISTRIBUTION SYSTEM - POINSETTIA LANE EAST OF BLACK RAIL ROAD PROJECT NAME PROJECT LOCATION MAP: PROJECT NO. #18 PROJECT LOCATION: Poinsettia Lane - 1,100 feet east of Black Rail Road. PROJECT DESCRIPTION: Construct 1,100 feet of 30-inch watermain. PROJECT NEED: Increase supply to 550 Zone and D3 Reservoir. FINANCING: Estimated CostPurpose Construction Construction Total Cost = $185,700 $185,600 $371,300 Funding Source Water Connection Water Replacement Poinblack Page 165 CAPITAL PROJECT DESCRIPTION 36581 WATER DISTRIBUTION SYSTEM - POINSETTIA LANE FROM "D" RESERVOIR TO AMBROSIA LANE PROJECT NAME PROJECT NO. PROJECT LOCATION MAP:PROJECT LOCATION: Poinsettia Lane from "D" Reservoir east 2,800 feet to Ambrosia Lane. PROJECT DESCRIPTION: Install 2,800 LF of 12-inch line. (In 550 H.G. Zone) PROJECT NEED: To meet the future demands of the area. Developer to pay 75% of the cost. FINANCING: Purpose Estimated Cost Funding Source Design/Construction $322,000 Water Connection Fee Total Cost = $322,000 POINS#18 Page 166 II II I 1 I I (1 El II II II I • § 1 t 1 II II II II I • II II iifiiiiiiiiiKiEiritfiiiifi CAPITAL PROJECT DESCRIPTION ! ! ! ! 1 WATER DISTRIBUTION SYSTEM - PRESSURE REDUCING STATION - SYCAMORE CREEK PROJECT NAME PROJECT LOCATION MAP: PROJECT i r i i PROJECT NO. #30 PROJECT LOCATION: Within Sycamore Creek area of LFMZ Zone 15. PROJECT DESCRIPTION: Upgrade existing Pressure Reducing Station for 490 to 375 Zone. PROJECT NEED: Increase capacity of existing Pressure Reducing Station to supply new development from 490 Zone. FINANCING: Purpose Construction Adm/Design/lnsp Total Cost = Estimated Cost Funding Source $76,300 $25,000 $101,300 Water Connection Water Connection Page 167 PRSJmpr CAPITAL PROJECT DESCRIPTION WATER DISTRIBUTION SYSTEM - PRESSURE REGULATING STATION (CANNON ROAD AND COLLEGE BOULEVARD) PROJECT NAME 38781 PROJECT NO. PROJECT LOCATION MAP: U\KE CALAVERA PROJECT LOCATION: Future intersection of Cannon Road and College Boulevard. PROJECT DESCRIPTION: Install pressure regulating station. Special Note: This project will take place when the existing Cannon Reservoir is taken out of service. (In 490-392 H.G. Zones). PROJECT NEED: To meet the future demands of the area. FINANCING: Estimated Cost Funding Source $250,000 Water Connection Fee $250,000 Purpose Design/Construction Total Cost = PRESSREG Page 168 ii ii ii ii ii ii » i ii ii • • mm mm mm t • • •• • I I I I I \ I I I i 1 i * i I I I i i I i i I i i i i i CAPITAL PROJECT DESCRIPTION i i i i i i i i i 38581 WATER DISTRIBUTION SYSTEM - RANCHO CARRILLO OVERSIZING/EXTENSION PROJECT NO. PROJECT NAME PROJECT LOCATION MAP: -8" WATER OVERSIZE PIPELINE PROJECT LOCATION: The waterline extends from Melrose Drive west along Via Patron and Terraza Portico to an existing waterline in Carrillo Way. Also include are two short extension within Paseo Aspada and Rancho Miel. PROJECT DESCRIPTION: Construction of new 8" and 10" water mains. A 10" waterline will be extended from an existing waterline in Melrose Drive to an existing waterline in Carrillo Way through the Village 'N' development of Rancho Carrillo to provide a looped water connection. The project also includes the extension of two 8" lines within Paseo Aspada and rancho Miel to complete the looped system. PROJECT NEED: To meet the future demands of the area and to provide for a looped water line for greater reliability to the existing residents within Village 'N' of the Rancho Carrillo development. FINANCING: Purpose Design/Construction Total Cost = Estimated Cost $90,000 $90,000 Funding Source Water Connection Fee RCJDver Page 169 CAPITAL PROJECT DESCRIPTION 39151 WATER DISTRIBUTION SYSTEM - TANGLEWOOD PRESSURE REDUCING STATION REPLACEMENT * PROJECT NO. PROJECT NAME PROJECT LOCATION MAP:PROJECT LOCATION: Intersection of Carlsbad Village Drive and El Camino Real. PROJECT DESCRIPTION: Replace vault, piping and valves of existing pressure reducing station. PROJECT NEED: The existing pressure reducing station is to be replaced due to deteriorated condition of vault, valve and piping. FINANCING: Purpose Design Construction Total Cost = Estimated Cost Funding Source $50,000 $250,000 $300,000 Water Replacement Fund Water Replacement Fund Tangle Page 170 I fl If II II II It II II II 1 I II II • 1 II I * II II II 1 * CAPITAL PROJECT DESCRIPTION WATER DISTRIBUTION SYSTEM - TAP RESERVOIR EXTERIOR PAINTING PROJECT NAME ill!!! 38531 PROJECT NO. PROJECT LOCATION MAP:PROJECT LOCATION: Northwest corner of Carlsbad Village Drive at College Boulevard. PROJECT DESCRIPTION: Repaint the exterior of TAP Reservoir. PROJECT NEED: The existing paint has deteriorated and requires repainting prior to new homes being constructed. Also will include anti-graffiti coating. FINANCING: Purpose Design Construction Total Cost = Estimated Cost Funding Source $5,000 $115,000 $120,000 Water Replacement Water Replacement Extr_pnt Page 171 CAPITAL PROJECT DESCRIPTION WATER DISTRIBUTION SYSTEM - WATER OPERATIONS WATER PUMP PROJECT PROJECT NAME 39001 PROJECT NO. PROJECT LOCATION MAP:PROJECT LOCATION: Ellery Pump Station - Janis Way. PROJECT DESCRIPTION: The Water District's Ellery Pump Station is designed to maintain adequate flow during fire demands and boost pressure in the event of a significant drop in pressure or increase in demand. The pump station operates from a motor control center that has a service life in excess of twenty years. The scope of this project is the replacement of the pump station's motor control center. PROJECT NEED: The motor control center for the Ellery Pump Station has over twenty years of service life. Its design is outdated, major components are obsolete and, as a result, repairs may not be possible. Replacement of the motor control center will ensure reliability, efficiency, availability of parts and the ability to pull maintenance in a safe and timely manner. FINANCING: Purpose Construction Total Cost = Estimated Cost $55,000 $55,000 Funding Source Water Replacement Waterpmp Page 172 i i i • ii ii ii ii ii ii r« i fi ii ft • ft « ii § a i • • I I I i i ! I i I I E i i i I ! I l I 1 f i I I I 1 I I CAPITAL PROJECT DESCRIPTION I i i i I i I i i i 36641 WATER DISTRIBUTION SYSTEM - WATER SYSTEM INTERTIE CONNECTION PROJECT NAME PROJECT NO. PROJECT LOCATION MAP:PROJECT LOCATION: VID - Business Park Drive Vallecitos Water District Olivenhain Water District San Dieguito Water District PROJECT DESCRIPTION: Construct pipeline system intertie with adjacent water agencies including Vista Irrigation District, Vallecitos Water District, Olivenhain Water District, and San Dieguito Water District. PROJECT NEED: During emergencies, these interties could supply water to the City and also provide water back to the adjacent agencies. FINANCING: Purpose Design/Construction Total Cost = Estimated Cost $400,000 $400,000 Funding Source Water Replacement WTRINTER Page 173 i i i t i i i I i I i i i I \ i i i i f i I l i \ i i i i i i i i i i i i RECYCLED WATER PROJECTS FUNDING MATRIX FOR RECYCLED WATER PROJECTS PROJ NO. NEW 35861 39141 34871 36753 38881 38901 38871 38891 PROJECT TITLE CHESTNUT AVENUE RECYCLED WATER LINE DEBT SERVICE ON STATE LOAN I-5 RECYCLED WATER TRANSMISSION LINE PASEO DEL NORTH RECYCLED PIPELINE REPLACEMENT PUMP STATION REMOVAL RECYCLED WATER PH II - FACILITY RECYCLED WATER PH II - FLOW EQUALIZATION RECYCLED WATER PH II - MAHR RESERVOIR IMPROVEMENTS RECYCLED WATER PH II - PIPELINES RECYCLED WATER PH II - PUMP STATIONS FUNDING SOURCE WATER REPL RECL WATER RECL WATER WATER REPL RECL WATER RECL WATER RECL WATER RECL WATER RECL WATER RECL WATER TOTAL BUDGET 394,000 1,561,648 140,000 660,000 400,000 12,000,018 3,536,000 1,790,000 19,810,500 3,816,900 YEAR OF SERVICE FUTURE YEAR BUDGET AMOUNTS YEAR1 2004-2005 159,527 YEAR 2 2005-2006 394,000 159,527 120,405 400,000 YEARS 2006-2007 159,527 YEAR 4 2007-2008 159,527 YEARS 2008-2009 159,527 YEAR 6-10 2010-2014 764,013 BUILDOUT 2015-2020 Page 174 li ii i • I I I i I i i I t 1 I I i i li l I i l i l •II Ii 11 i 1 1 i I i i I i I I I I I i I J I i t J I 1 f 1 I i I I I i f J CAPITAL PROJECT DESCRIPTION RECYCLED WATER PROJECTS - CHESTNUT AVENUE RECYCLED WATER LINE PROJECT NAME I ! I I I 1 NONE PROJECT NO. PROJECT LOCATION MAP:PROJECT LOCATION: Chestnut Avenue from 1-5 to SDNR right-of-way. PROJECT DESCRIPTION: Construct an 8-inch PVC recycled waterline in Chestnut Avenue from the existing line in 1-5 to the railroad right-of-way. PROJECT NEED: The new 8-inch line will provide the distribution of recycled water to the future Pine School Park and the Coastal Rail Trail. FINANCING: Purpose Administration Design Construction Total Cost = Estimated Cost Funding Source $17,000 $25,000 $352,000 $394,000 Water Replacement Water Replacement Water Replacement Chestnut Page 175 CAPITAL PROJECT DESCRIPTION RECYCLED WATER PROJECTS - DEBT SERVICE ON STATE LOAN PROJECT NAME NONE PROJECT NO. PROJECT LOCATION MAP: N/A DEBTSERV PROJECT LOCATION: N/A PROJECT DESCRIPTION: Repayment of a low interest loan obtained through the State's Revolving Fund to pay for the City's Phase I recycled water system. Total amount of the loan to be paid in equal installments over a 20-year period. PROJECT NEED: The loan was required to fund the City's Phase I recycled water program. FINANCING: Purpose Estimated Cost Funding Source Loan Repayment $1,561,648 Recycled Water Total Cost = $1,561,648 Page 176 f l i i i i I I f • i i i 1 i i f i f i t i t a ft i i i i i i i ( a • I I I 1 I I I I I I I l I I I I I i I I I I 1 I 1 I I i I I I j CAPITAL PROJECT DESCRIPTION RECYCLED WATER PROJECTS - 1-5 RECYCLED WATER TRANSMISSION LINE PROJECT NAME E i i i i i 35861 PROJECT NO. PROJECT LOCATION MAP: PROJECT PROJECT LOCATION: I-5 Freeway from Palomar Airport Road to Carlsbad Village Drive. PROJECT DESCRIPTION: Caltrans installed a transmission main from Poinsettia Lane north to Jefferson Street in 1996. The pipeline was oversized to supply recycled water to areas north of Tamarack Avenue. PROJECT NEED: To supply recycled water to Carlsbad north of Tamarack Avenue. FINANCING: Purpose Estimated Cost Funding Source Design/Construction $140,000 Recycled Water Total Cost = $140,000 I5TRNSLN Page 177 CAPITAL PROJECT DESCRIPTION 39141 RECYCLED WATER PROJECTS - PASEO DEL NORTE RECYCLED PIPELINE REPLACEMENT PROJECT NO. PROJECT NAME PROJECT LOCATION MAP:PROJECT LOCATION: In Paseo Del Norte from Poinsettia Park boundary north to Palomar Airport Road. PROJECT DESCRIPTION: Construct 4,000 feet of 12-inch diameter pipe in Paseo Del Norte from Sea Gate Drive to Palomar Airport Road, and in Palomar Airport Road from Paseo Del Norte to Armada Drive. Other alternative pipeline alignments will be considered. PROJECT NEED: The existing 12-inch diameter steel pipeline, installed in 1962, from Paseo Del Norte north to Palomar Airport Road broke in 2001. The existing pipeline is located in an easement that crosses Encinas Creek near the entrance to Costco. Attempts made to locate and fix the break have been unsuccessful primarily because of the woodland area. The recycled water master plan requires this pipeline to be in place to provide adequate flows to areas north of Palomar Airport Road in the 384 pressure zone for future recycled water customers. FINANCING: Purpose Estimated Cost Design & Environmental $60,000 Construction $600,000 Funding Source Water Replacement Water Replacement Total Cost =$660,000 PDN_pipe Page 178 I I 1 I I I I I I 1 I J I 1 I I ii ii ii • a • • I I I I I I I I t i i i i I i \ i i i i f i i i i \ i i CAPITAL PROJECT DESCRIPTION RECYCLED WATER - PUMP STATION REMOVAL PROJECT NAME I \l\\\\\\\ 34871 PROJECT NO. PROJECT LOCATION MAP: PALOMAR PROJECT PROJECT LOCATION: El Camino Real south of Palomar Airport Road. PROJECT DESCRIPTION: Remove existing pump station and rehabilitate site. PROJECT NEED: Upon completion of Encina Basin Phase II and Carlsbad Boulevard Reclamation Facility Projects, existing pump station is no longer necessary. FINANCING: Purpose Estimated Cost Funding Source Design/Construction $400,000 Recycled Water Total Cost = $400,000 RCSTNUPGdoc Page 179 CAPITAL PROJECT DESCRIPTION RECYCLED WATER PHASE II - FACILITY PROJECT NAME 36752 & 36753 PROJECT NO. PROJECT LOCATION MAP: ROJECT SITE PROJECT LOCATION: South of Encina Water Pollution Control Facility (EWPCF). PROJECT DESCRIPTION: Design and construction of the Phase II Recycled Water Treatment Facilities near EWPCF on Avenida Encinas (4.0 mgd). This project is one of a series of projects included in the Phase II Recycled Water Program as identified in the City's Recycled Water Master Plan. PROJECT NEED: To provide additional recycled water to meet Phase II demand requirements of 4,480 acre-feet per year. FINANCING: Purpose Construction Total Cost = Estimated Cost Funding Source $12,000,018 Recycled Water $12,000,018 Trt_plnt Page 180 II II fl II II II II II I 1 I J I I i i l i i i i i ? i i i i i I f i i i i i t i i \ CAPITAL PROJECT DESCRIPTION RECYCLED WATER - RECYCLED WATER PHASE II - FLOW EQUALIZATION PROJECT NAME \ i \ i i 38881 PROJECT NO. PROJECT LOCATION MAP: PROJECT SITE PROJECT LOCATION: Adjacent to the Carlsbad Water Reclamation Facility. PROJECT DESCRIPTION: Construction of a water storage facility adjacent to the Encina WPCF for the dual purpose of providing a clearwell for plant operations and a forebay, which would allow the pumps to operate at a constant discharge rate or adjust pumping rates based on peak irrigation periods. PROJECT NEED: Reduce the use of potable water by providing reclaimed water for irrigation purposes. FINANCING: Purpose Total Cost = Estimated Cost $3,536,000 Funding Source Recycled Water Flowequa Page 181 CAPITAL PROJECT DESCRIPTION RECYCLED WATER PROJECTS - PHASE II - MAHR RESERVOIR IMPROVEMENTS PROJECT NAME 38901 PROJECT NO. PROJECT LOCATION MAP: HWY78 PROJECT LOCATION: At Mahr Reservoir. PROJECT DESCRIPTION: Mahr Reservoir is an existing earthen fill dam constructed in 1982 to store recycled water from the Meadowlark Reclamation Facility. It is located east of Rancho Santa Fe Road just south of Melrose Drive. Both the Meadowlark Reclamation Facility and Mahr Reservoir are owned and operated by Vallecitos Water District (VWD). PROJECT NEED: To meet water quality and operation needs for CMWD's recycled water system requires certain improvements be made to Mahr Reservoir. These improvements include: • Dredging and cleaning the reservoir bottom • Modifying the inlet/outlet works • Adding an aeration/destratification system • Performing miscellaneous site work FINANCING: Purpose Total Cost = Estimated Cost $1,790,000 Funding Source Recycled Water MahrJI Page 182 ti fi i • fi 11 11 il •• * * I I I 1 I i I I I ) I ! { ! I ! I ! I ! I i ! 1 I 1 ! ! I i f CAPITAL PROJECT DESCRIPTION RECYCLED WATER - RECYCLED WATER PHASE II - PIPELINES PROJECT NAME C I I 1 I I 38871 PROJECT NO. PROJECT LOCATION MAP: PROJECT AREA PROJECT LOCATION: Palomar Airport industrial corridor and portion of northeast quadrant. PROJECT DESCRIPTION: Construction of approximately 120,126 feet of distribution pipelines ranging in size from 4 inches to 24 inches in diameter, 3 pressure reducing stations and connecting the Carlsbad Water Reclamation Facility with the Mahr Reservoir. PROJECT NEED: Reduce the use of potable water by providing reclaimed water for irrigation purposes. FINANCING: Purpose Total Cost = Estimated Cost Funding Source $19,810,500 Recycled Water Pipeline Page 183 CAPITAL PROJECT DESCRIPTION RECYCLED WATER - RECYCLED WATER PHASE II - PUMP STATIONS PROJECT NAME 38891 PROJECT NO. PROJECT LOCATION MAP: Pumpstat i • CAUWERA PUMP STATION PAR/ECR PUMP STATION PROJECT LOCATION: "D" Tanks, Palomar Airport Road and El Camino Real, and College Boulevard north of Cannon Road. PROJECT DESCRIPTION: Construction of pump stations to transport reclaimed water to the following service areas: • "D" Tank Pump Station (384/550 Zone) • Calavera Pump Station (550 Zone) • PAR/ECR Pump Station (660 Zone) PROJECT NEED: To reduce the use of potable water by providing reclaimed water for irrigation purposes. FINANCING: Purpose Total Cost = Estimated Cost Funding Source $3,816,900 Recycled Water Page 184 ii • • m CIRCULATION SYSTEM PROJECTS II t 1 I I I j i I I I I I ! } i I I I I i I I I I f I i I I I I J I ! I i TRAFFIC SIGNAL PROJECTS FUNDING MATRIX FOR TRAFFIC SIGNAL PROJECTS PROJ NO. 38931 33691 33692 33693 38941 39161 39021 39061 38461 39171 39181 38811 39311 38621 38991 38001 38451 36461 36211 NEW 39381 36441 39351 39391 PROJECT TITLE TRAP SIG - ALGA ROAD AND CAZADERO TRAP SIG - ALGA ROAD AND XANA WAY TRAP SIG - AVIARA PKWY-POINSETTIA LN TO EL CAMINO REAL TRAP SIG - AVIARA PKWY-POINSETTIA LN TO EL CAMINO REAL TRAP SIG - AVIARA PKWY-POINSETTIA LN TO EL CAMINO REAL TRAP SIG - CALLE BARCELONA AND PASEO ALISO TRAP SIG - CALLE BARCELONA AND PASEO AVELLANO TRAP SIG - CAMINO DE LOS COCHES AND CALLE ACERVO TRAP SIG - CAMINO DE LOS COCHES AND LA COSTA AVENUE TRAP SIG - CAMINO VIDA ROBLE AND YARROW DRIVE TRAP SIG - CANNON ROAD AND AVENIDA ENCINAS TRAP SIG - CANNON ROAD AND CAR COUNTRY TRAP SIG - CANNON ROAD AND COLLEGE BOULEVARD TRAP SIG - CARLSBAD BOULEVARD AND AVENIDA ENCINAS TRAP SIG - CARLSBAD BOULEVARD AND CHERRY AVE TRAP SIG - CARLSBAD BOULEVARD AND OAK AVENUE TRAP SIG - CARLSBAD VILLAGE DRIVE AND GLASGOW DRIVE TRAP SIG - CARLSBAD VILLAGE DRIVE AND CHATHAM ROAD TRAP SIG - CARLSBAD VILLAGE DRIVE AND AVENIDA DE ANITA TRAP SIG - COLLEGE BOULEVARD AND EL CAMINO REAL TRAP SIG - COLLEGE BOULEVARD AND CARLSBAD VILLAGE DRIVE TRAP SIG - COLLEGE BOULEVARD AND TAMARACK AVE (SOUTH) TRAP SIG - COLLEGE BOULEVARD AND TAMARACK AVE (NORTH) TRAP SIG - EL CAMINO REAL/PLAZA/MARRON/HOSP WAY TRAP SIG - EL CAMINO REAL AND POINSETTIA LANE TRAP SIG - EL CAMINO REAL CORRIDOR STUDY TRAP SIG - FARADAY AND CANNON ROAD TRAP SIG - FARADAY AVENUE AND CAMINO HILLS DRIVE TRAP SIG - FARADAY AVENUE AND ORION STREET TRAP SIG - FARADAY AVENUE AND PRIESTLY DRIVE TRAP SIG - FARADAY AVENUE AND RUTHERFORD ROAD TRAP SIG - LA COSTA AVENUE AND ESFERA STREET TRAP SIG - LA COSTA AVENUE AND LEVANTE TRAP SIG - LA COSTA AVENUE/NUEVA CASTILLA TRAP SIG - MELROSE DRIVE AND LA COSTA AVENUE TRAP SIG - MONROE STREET AND HOSP WAY TRAP SIG - PALOMAR AIRPORT ROAD AND MELROSE DRIVE TRAP SIG - PASEO DEL NORTE AND CAR COUNTRY DRIVE TRAP SIG - POINSETTIA LANE AND BLACK RAIL ROAD FUNDING SOURCE GAS TAX GCC TIP ASMT DIST GCC GCC GCC GCC PFF PFF PFF GCC PFF PFF GCC GAS TAX GCC GCC GAS TAX PFF PFF PFF GCC TRANSNET-LOC PFF GCC PFF GCC TIP GAS TAX GCC GAS TAX GCC GCC PFF GCC PFF GAS TAX GCC TOTAL BUDGET 185,000 235,270 30,000 602,649 160,000 188,074 185,000 190,000 185,000 185,000 150,000 176,400 185,000 185,000 185,000 185,000 210,000 210,000 80,000 185,000 185,000 188,178 210,000 1,200,000 204,250 29,000 125,000 185,000 185,000 210,000 185,000 185,000 210,000 185,000 185,000 185,000 250,000 210,000 210,000 YEAR OF SERVICE 2003 2004 2004 2004 2005 2005 2005 FUTURE YEAR BUDGET AMOUNTS YEAR1 2004-2005 60,000 210,000 210,000 210,000 YEAR 2 2005-2006 185,000 YEAR 3 2006-2007 185,000 YEAR 4 2007-2008 YEARS 2008-2009 YEAR 6-10 2010-2014 185,000 185,000 185,000 185,000 185,000 185,000 185,000 185,000 185,000 185,000 185,000 185,000 185,000 185,000 185,000 BUILDOUT 2015-2020 Page 185 f • • a « • I 1 f 1 I i f f I I t 1 f 3 ( ! I I f I I 1 I ! I 1 I I I 1 i i i ! ! 1 I FUNDING MATRIX FOR TRAFFIC SIGNAL PROJECTS PROJ NO. 39461 38491 38821 34061 39401 PROJECT TITLE TRAP SIG - POINSETTIA LANE AND BRIGANTINE ROAD TRAP SIG - POINSETTIA LANE AND EL FUERTE STREET (REIMB) TRAP SIG - POINSETTIA LANE AND MELROSE DRIVE TRAP SIG - POINSETTIA LANE AND PASEO ESCUELA TRAP SIG - POINSETTIA LANE AND SNAPDRAGON DRIVE TRAP SIG - RANCHO SANTA FE RD AND MELROSE DR (SOUTH) TRAP SIG - RANCHO SANTA FE ROAD AND QUESTHAVEN ROAD TRAP SIG - TAMARACK AVENUE AND PONTIAC DRIVE TRAP SIG - TAMARACK AVENUE AND VALLEY STREET TRAP SIG - TAMARACK AVENUE AND GARFIELD STREET FUNDING SOURCE GCC PFF PFF GAS TAX GAS TAX PFF GCC GCC GCC PFF TOTAL BUDGET 185,000 210,000 185,000 210,000 190,000 185,000 125,000 210,000 185,000 185,000 YEAR OF SERVICE 2005 FUTURE YEAR BUDGET AMOUNTS YEAR1 2004-2005 210,000 210,000 YEAR 2 2005-2006 YEAR 3 2006-2007 YEAR 4 2007-2008 YEARS 2008-2009 YEAR 6-10 2010-2014 185,000 185,000 185,000 185,000 BUILDOUT 2015-2020 185,000 Page 186 CAPITAL PROJECT DESCRIPTION CIRCULATION SYSTEM TRAFFIC SIGNALS - ALGA ROAD AND CAZADERO DRIVE PROJECT NAME NONE PROJECT NO. PROJECT LOCATION MAP:PROJECT LOCATION: At the intersection of Alga Road and Cazadero Drive. PROJECT DESCRIPTION: Installation of a four-leg, fully actuated traffic signal, including a type 170 controller, 200SA local intersection control program, video detection, battery back-up system, appurtenant signing and striping, and signal interconnect to adjacent controllers. PROJECT NEED: Caltrans signal warrants have been met. The intersection is listed on the qualification list of the City's Traffic Signal Evaluation Policy. The installation of this traffic signal will assign the right-of-way for both motorists and pedestrians entering and crossing at the intersection. FINANCING: Purpose Design Construction Admin/Inspection Total Cost = Estimated Cost $8,000 $165,000 $12,000 $185,000 Funding Source Gas Tax Gas Tax Gas Tax ALGACAZA Page 187 iiiltiiiiiiiil i t i f i { i 1 i i i { i ! i { t i i f i f i f i i i i i CAPITAL PROJECT DESCRIPTION CIRCULATION SYSTEM TRAFFIC SIGNALS - ALGA ROAD AND XANA WAY PROJECT NAME 38931 PROJECT NO. PROJECT LOCATION MAP: SIGNAL PROJECT LOCATION: At the intersection of Alga Road and Xana Way. PROJECT DESCRIPTION: Installation of a four-leg, fully actuated traffic signal, including a type 170 controller, 200SA local intersection control program, video detection, battery back-up system, appurtenant signing and striping, and signal interconnect to adjacent controllers. PROJECT NEED: Since a Caltrans traffic signal warrant has been met, the intersection has been included on the Traffic Signal Qualification List, which is part of the City's 2004 Traffic Signal Evaluation Policy. The installation of a traffic signal will increase the safety for both motorists and pedestrians entering and crossing Alga Road from Xana Way, which are currently unmet needs. FINANCING: Purpose Design Construction Admin/Inspection Total Cost = Estimated Cost $3,870 $204,700 $26,700 $235,270 Funding Source GCC GCC GCC Annual Operating Cost = $5,000 Algaxana Page 188 CAPITAL PROJECT DESCRIPTION CIRCULATION SYSTEM TRAFFIC SIGNALS - AVIARA PARKWAY (POINSETTIA LANE TO EL CAMINO REAU PROJECT NAME 33691, 33692 & 33693 PROJECT NO. PROJECT LOCATION MAP:PROJECT LOCATION: At various intersections on Aviara Parkway between Poinsettia Lane and El Camino Real. PROJECT DESCRIPTION: Construct traffic signals and/or make minor drainage improvements to the following intersections with Aviara Parkway: 1. Poinsettia Lane - Minor Drainage Improvements 2. Nightshade Road - Traffic Signal 3. Kestrol Drive - Traffic Signal 4. Tohee Lane - Traffic Signal 5. Black Rail Road - Traffic Signal 6. Finch Lane - Traffic Signal PROJECT NEED: Signals needed to comply with Growth Management Standards. Traffic signals will be installed when they are warranted. Minor street improvements are needed to accommodate street drainage. Improvements will be constructed when Aviara Parkway is extended north of Poinsettia Lane. FINANCING: Purpose Design/Construction Design/Construction Design/Construction Total Cost = Estimated Cost Funding Source $602,649 $30,000 $160,000 $792,649 Assessment District 88-01 TIP GCC AVIATSIGLdoc Page 189 I 1 I I I 1 I I CAPITAL PROJECT DESCRIPTION 38941 CIRCULATION SYSTEM TRAFFIC SIGNALS - CALLE BARCELONA AND PASEO ALISO PROJECT NAME PROJECT NO. PROJECT LOCATION MAP:PROJECT LOCATION: Intersection of Calle Barcelona and Paseo Aliso. PROJECT DESCRIPTION: Installation of a four-leg, fully actuated traffic signal, including a type 170 controller, 200SA local intersection control program, video detection, battery back-up system, appurtenant signing and striping, and signal interconnect to adjacent controllers. PROJECT NEED: A Caltrans traffic signal warrant has been met. The intersection is listed on the Traffic Signal Qualification List of the City's 2004 Traffic Signal Evaluation Policy. The installation of this traffic signal will assign the right-of-way for both motorists and pedestrians entering and crossing at this intersection. This is an elementary school pedestrian crossing. FINANCING: Purpose Design Construction Admin/Inspection Estimated Cost $3,500 $141,980 $42,594 Funding Source GCC GCC GCC Total Cost = $188,074 Annual Operating Cost = $5,000 Callepas Page 190 CAPITAL PROJECT DESCRIPTION NONE CIRCULATION SYSTEM TRAFFIC SIGNALS - CALLE BARCELONA AND PASEO AVELLANO PROJECT NAME PROJECT NO. PROJECT LOCATION MAP:PROJECT LOCATION: Intersection of Calle Barcelona and Paseo Avellano. PROJECT DESCRIPTION: Installation of a four-leg, fully actuated traffic signal, including a type 170 controller, 200SA local intersection control program, video detection, battery back-up system, appurtenant signing and striping, and signal interconnect to adjacent controllers. PROJECT NEED: A Caltrans traffic signal warrant has been met. The intersection is listed on the Traffic Signal Qualification List of the City's 2004 Traffic Signal Evaluation Policy. The installation of this traffic signal will assign the right-of-way for both motorists and pedestrians entering and crossing at this intersection. FINANCING: Purpose Design Construction Admin/Inspection Total Cost = Estimated Cost $8,000 $165,000 $12,000 $185,000 Funding Source GCC GCC GCC Callebarc Page 191 • I II • I I I C i I I I i I 1 I i 1 I ! ! f ! f ! f I t I f I f 1 f I CAPITAL PROJECT DESCRIPTION i i i i I i I i E i 39161 CIRCULATION SYSTEM TRAFFIC SIGNALS - CAMINO DE LOS COCHES AND CALLE ACERVO PROJECT NO. PROJECT NAME PROJECT LOCATION MAP:PROJECT LOCATION: At the intersection of Camino De Los Coches and Calle Acervo. PROJECT DESCRIPTION: Installation of a three-leg, fully-actuated traffic signal, including a Type 170E controller, 200SA local intersection control program, video detection, battery back-up system, appurtenant signing and striping, and signal interconnect to adjacent controllers at Camino De Los Coches and La Costa Canyon High School Driveway and Camino De Los Coches and Rancho Santa Fe Road. PROJECT NEED: This intersection meets two of the eleven Caltrans Traffic Signal Warrants (Warrant #9, Four Hour Volume, and Warrant #11, Peak Hour Volume). There have been four accidents in a 12-month period ending March 2003. Caltrans considers five accidents or more during a 12-month period to be significant. FINANCING: Purpose Design Construction Admin/Inspection Total Cost = Estimated Cost $8,000 $161,000 $21,000 $190,000 Funding Source GCC GCC GCC Annual Operating Cost = $5,000 CDLC_CA Page 192 CAPITAL PROJECT DESCRIPTION CIRCULATION SYSTEM TRAFFIC SIGNALS - CAMINO DE LOS COCHES AND LA COSTA AVENUE PROJECT NAME NONE PROJECT NO. PROJECT LOCATION MAP: IGNAL LOCATION CAMINODE • I f 1 PROJECT LOCATION: Intersection of Camino de los Coches and La Costa Avenue. PROJECT DESCRIPTION: Installation of a four-leg, fully actuated traffic signal, including a type 170 controller, 200SA local intersection control program, video detection, battery back-up system, appurtenant signing and striping, and signal interconnect to adjacent controllers. PROJECT NEED: Needed to comply with Growth Management Standards. Installation will occur when traffic signal warrants are met. The installation of this traffic signal will assign the right-of-way for both motorists and pedestrians entering and crossing at the intersection. FINANCING: Purpose Design Construction Admin/Inspection Total Cost = Estimated Cost Funding Source $8,000 $165,000 $12,000 $185,000 PFF PFF PFF Page 193 I • i i t i i i i i I i fiiirifififififiti CAPITAL PROJECT DESCRIPTION i i i i i i i i i NONE CIRCULATION SYSTEM TRAFFIC SIGNALS - CAMINO VIDA ROBLE AND YARROW DRIVE PROJECT NO. PROJECT NAME PROJECT LOCATION MAP: SIGNAL LOCATION PROJECT LOCATION: Intersection of Camino Vida Roble and Yarrow Drive. PROJECT DESCRIPTION: Installation of a three-leg, fully actuated traffic signal, including a type 170 controller, 200SA local intersection control program, video detection, battery back-up system, appurtenant signing and striping, and signal interconnect to adjacent controllers. PROJECT NEED: Needed to comply with Growth Management Standards and traffic signal warrants. Installation will occur when traffic signal warrants are met. The installation of this traffic signal will assign the right-of-way for both motorists and pedestrians entering and crossing at the intersection. FINANCING: Purpose Design Construction Admin/Inspection Total Cost = Estimated Cost Funding Source $8,000 $165,000 $12,000 $185,000 PFF PFF PFF CAMINOYA Page 194 CAPITAL PROJECT DESCRIPTION 39021 CIRCULATION SYSTEM TRAFFIC SIGNALS - CANNON ROAD AND AVENIDA ENCINAS PROJECT NO. PROJECT NAME PROJECT LOCATION MAP: Ira RD. PROJECT LOCATION: Intersection of Cannon Road and Avenida Encinas, immediately west of Interstate 5. PROJECT DESCRIPTION: Installation of a 5-phase, fully actuated traffic signal, including a Type 170 controller, 176 intersection control program and minor intersection improvements. PROJECT NEED: Needed to comply with Growth Management Standards. Installation will occur when traffic signal warrants are met. FINANCING: Purpose Estimated Cost Funding Source Design/Construction $150,000 PFF Total Cost = $150,000 CANNON1 Page 195 I I I 1 • 1 I 1 1 1 1 1 1 i s i i i i i I i i i i i i i i ! i i I i f i i i i CAPITAL PROJECT DESCRIPTION I f i l i f i I i f i 39061 CIRCULATION SYSTEM TRAFFIC SIGNALS - CANNON ROAD AND CAR COUNTRY DRIVE PROJECT NO. PROJECT NAME PROJECT LOCATION MAP: SIGNAL LOCATION PROJECT LOCATION: Intersection of Cannon Road and Avenida Encinas, immediately west of Interstate 5. PROJECT DESCRIPTION: Installation of a fully actuated traffic signal, including a Type 170 controller, 176 intersection control program and minor intersection improvements. PROJECT NEED: Needed to comply with Growth Management Standards. Installation will occur when traffic signal warrants are met. FINANCING: Purpose Estimated Cost Funding Source Design/Construction $176,400 GCC Total Cost = $176,400 Can_car Page 196 CAPITAL PROJECT DESCRIPTION NONE CIRCULATION SYSTEM TRAFFIC SIGNALS - CANNON ROAD AND COLLEGE BOULEVARD PROJECT NO. PROJECT NAME PROJECT LOCATION MAP:PROJECT LOCATION: Intersection of Cannon Road and College Boulevard. PROJECT DESCRIPTION: Installation of a four-leg, fully actuated traffic signal, including a type 170 controller, 200SA local intersection control program, video detection, battery back-up system, appurtenant signing and striping, and signal interconnect to adjacent controllers. PROJECT NEED: Needed to comply with Growth Management Standards. Installation will occur when traffic signal warrants are met. The installation of this traffic signal will assign the right-of-way for both motorists and pedestrians entering and crossing at the intersection. FINANCING: Purpose Design Construction Admin/Inspection Total Cost = Estimated Cost Funding Source $8,000 $163,000 $12,000 $185,000 PFF PFF PFF CANNON2 Page 197 • I 1 I 1 i I I I 1 f I iiiiiiiifll ilifirifififiiii CAPITAL PROJECT DESCRIPTION i i i i i t i i i NONE CIRCULATION SYSTEM TRAFFIC SIGNALS - CARLSBAD BOULEVARD AND AVENIDA ENCINAS PROJECT NO. PROJECT NAME PROJECT LOCATION MAP: SIGNAL LOCATON PROJECT LOCATION: Intersection of Carlsbad Boulevard and Avenida Encinas. PROJECT DESCRIPTION: Installation of a three-leg, fully actuated traffic signal, including a type 170 controller, 200SA local intersection control program, video detection, battery back-up system, appurtenant signing and striping, and signal interconnect to adjacent controllers. PROJECT NEED: Needed to comply with Growth Management Standards. Installation to occur when Carlsbad Boulevard is realigned. The installation of this traffic signal will assign the right-of-way for both motorists and pedestrians entering and crossing at the intersection. FINANCING: Purpose Design Construction Admin/Inspection Total Cost = Estimated Cost Funding Source $8,000 $165,000 $12,000 $185,000 PFF PFF PFF CBADAVEN Page 198 CAPITAL PROJECT DESCRIPTION 38461 CIRCULATION SYSTEM TRAFFIC SIGNALS - CARLSBAD BOULEVARD AND CHERRY AVENUE PROJECT NO. PROJECT NAME PROJECT LOCATION MAP: PROJECT SITE PACIFIC OCEAN PROJECT LOCATION: Intersection of Carlsbad Boulevard and Cherry Avenue. PROJECT DESCRIPTION: Installation of a three-leg, fully actuated traffic signal, including a type 170 controller, 200SA local intersection control program, video detection, battery back-up system, appurtenant signing and striping, and signal interconnect to adjacent controllers. PROJECT NEED: Caltrans traffic signal warrants have been met. The intersection is listed on the qualification list of the City's Traffic Signal Evaluation Policy. The installation of this traffic signal will assign the right-of-way for both motorists and pedestrians entering and crossing at the intersection. FINANCING: Purpose Design Construction Admin/Inspection Total Cost = Estimated Cost Funding Source $8,000 $165,000 $12,000 $185,000 GCC GCC GCC CBCherry Page 199 II II II ! i l t i I I I i i i i i i i f i i i l i I i t i i CAPITAL PROJECT DESCRIPTION 1 I I I I I I ! ! I I NONE CIRCULATION SYSTEM TRAFFIC SIGNALS - CARLSBAD BOULEVARD AND OAK AVENUE PROJECT NO. PROJECT NAME PROJECT LOCATION MAP:PROJECT LOCATION: At the intersection of Carlsbad Boulevard and Oak Avenue. PROJECT DESCRIPTION: Installation of a four-leg, fully actuated traffic signal, including a type 170 controller, 200SA local intersection control program, video detection, battery back-up system, appurtenant signing and striping, and signal interconnect to adjacent controllers. PROJECT NEED: Caltrans signal warrants have been met. The intersection is listed on the Traffic Signal Qualification List of the City's 2004 Traffic Signal Evaluation Policy. The installation of this traffic signal will assign the right-of-way for both motorists and pedestrians entering and crossing at the intersection. FINANCING: Purpose Design Construction Admin/Inspection Estimated Cost $8,000 $165,000 $12,000 Funding Source Gas Tax Gas Tax Gas Tax Total Cost = Annual Operating Cost: = $5,000 $185,000 CBLVDOAK.doc Page 200 CAPITAL PROJECT DESCRIPTION 39171 CIRCULATION SYSTEM TRAFFIC SIGNALS - CARLSBAD VILLAGE DRIVE AND GLASGOW DRIVE PROJECT NO. PROJECT NAME PROJECT LOCATION MAP: CITYOFOCEANSJDE CITY OF CARLSBAD PROJECT LOCATION: At the intersection of Carlsbad Village Drive and Glasgow Drive. PROJECT DESCRIPTION: Installation of a four-leg, fully-actuated traffic signal, including a Type 170E controller, 200SA local intersection control program, video detection, battery back-up system, appurtenant signing and striping, and signal interconnect to adjacent controllers at Carlsbad Village Drive (CVD) and Tamarack Avenue and Carlsbad Village Drive and College Boulevard. PROJECT NEED: The adjacent intersection to the west (CVD/Tamarack) is currently signalized and the adjacent intersection to the east (CVD/College) will be signalized upon the completion of College Boulevard south of CVD. Due to the increase in vehicular volume, Caltrans Traffic Signal Warrant #7 (Systems Warrant) is projected to be satisfied after the aforementioned extension of College Boulevard. FINANCING: Purpose Design Construction Admin/Inspection Total Cost = Estimated Cost $8,000 $180,000 $22,000 $210,000 Funding Source GCC GCC GCC Annual Operating Cost: $5,000 CVD_glas Page 201 II II II II II II II I I I f I I I I I I I 1 I ! ! ! ( ! I ! f I I I I I I CAPITAL PROJECT DESCRIPTION \ i i f i i i I 39181 CIRCULATION SYSTEM TRAFFIC SIGNALS - CARLSBAD VILLAGE DRIVE AND CHATHAM ROAD PROJECT NO. PROJECT NAME PROJECT LOCATION MAP:PROJECT LOCATION: Intersection of Carlsbad Village Drive and Chatham Road. PROJECT DESCRIPTION: Installation of a four-leg, fully actuated traffic signal, including a type 170 controller, 200SA local intersection control program, video detection, battery back-up system, appurtenant signing and striping, and signal interconnect to adjacent controllers. PROJECT NEED: A Caltrans traffic signal warrant has been met. The intersection is listed on the Traffic Signal Qualification List of the City's 2004 Traffic Signal Evaluation Policy. The installation of this traffic signal will assign the right-of-way for both motorists and pedestrians entering and crossing at this intersection. FINANCING: Purpose Design Construction Admin/Inspection Total Cost = Estimated Cost $8,000 $180,000 $22,000 Funding Source GCC GCC GCC $210,000 Annual Operating Cost = $5,000 CVDchath Page 202 CAPITAL PROJECT DESCRIPTION 38811 CIRCULATION SYSTEM TRAFFIC SIGNALS - CARLSBAD VILLAGE DRIVE AND AVENIDA DE ANITA PROJECT NO. PROJECT NAME PROJECT LOCATION MAP:PROJECT LOCATION: At the intersection of Carlsbad Village Drive and Avenida De Anita. PROJECT DESCRIPTION: Installation of a fully traffic actuated traffic signal with Type 170 controller and appurtenant striping and signing. The traffic signal is a requirement of the adjacent development project. The budgeted amount represents the City's estimated contribution. PROJECT NEED: Caltrans signal warrants have been met. The intersection is listed on the qualification list of the City's Traffic Signal Evaluation Policy. In addition, the property to the south of the intersection is approved for a residential development which will add a fourth leg to the intersection. The development is conditioned to pay for one quarter of the traffic signal work. No development schedule has been submitted, however, the project tentative map will expire this year with a potential for two more years worth of extensions. FINANCING: Purpose Construction Total Cost = Estimated Cost $80,000 $80,000 Funding Source Gas Tax CVDAVENI Page 203 II II II i i f i i i i I i i 1 i 1 I I f i i i i I I I i I i I I CAPITAL PROJECT DESCRIPTION i i I i f i i i i i NONE CIRCULATION SYSTEM TRAFFIC SIGNALS - COLLEGE BOULEVARD AND EL CAMINO REAL PROJECT NO. PROJECT NAME PROJECT LOCATION MAP:PROJECT LOCATION: Intersection at College Boulevard and El Camino Real. PROJECT DESCRIPTION: Installation of an 8-phase, fully actuated traffic signal including a Type 170 controller and a Type 176 intersection control program. PROJECT NEED: Needed to meet Growth Management Standards. FINANCING: Purpose Design Construction Admin/lnsp Total Cost = Estimated Cost Funding Source $8,000 $165,000 $12,000 $185,000 PFF PFF PFF COLL_ECR Page 204 CAPITAL PROJECT DESCRIPTION NONE CIRCULATION SYSTEM TRAFFIC SIGNALS - COLLEGE BOULEVARD AND CARLSBAD VILLAGE DRIVE PROJECT NAME PROJECT NO. PROJECT LOCATION MAP:PROJECT LOCATION: Intersection of College Boulevard and Carlsbad Village Drive. PROJECT DESCRIPTION: Installation of a four-leg, fully actuated traffic signal, including a type 170 controller, 200SA local intersection control program, video detection, battery back-up system, appurtenant signing and striping, and signal interconnect to adjacent controllers. PROJECT NEED: Needed to comply with Growth Management Standards. Installation will occur when traffic signal warrants are met. The installation of this traffic signal will assign the right-of-way for both motorists and pedestrians entering and crossing at the intersection. FINANCING: Purpose Design Construction Admin/Inspection Total Cost = Estimated Cost Funding Source $8,000 $165,000 $12,000 $185,000 PFF PFF PFF COL CVD Page 205 Illlllllllllllflllllllllllllllll t i 11 ii ii t i • 1 ii fi ii ii ii 11 ii i i CAPITAL PROJECT DESCRIPTION I i 11 I i II il 39311 CIRCULATION SYSTEM TRAFFIC SIGNALS - COLLEGE BOULEVARD AND TAMARACK AVENUE (LAKE CALAVERA ENTRANCE) PROJECT NAME PROJECT NO. PROJECT LOCATION MAP:PROJECT LOCATION: Intersection of College Boulevard and Lake Calavera entrance. PROJECT DESCRIPTION: Installation of a 4-phase, fully actuated traffic signal, including a Type 170 controller and 176 intersection control program. PROJECT NEED: Needed to comply with Growth Management Standards and traffic signal warrants. FINANCING: Purpose Estimated Cost Funding Source Design/Construction $188,178 PFF Total Cost = $188,178 COLLKCAL Page 206 CAPITAL PROJECT DESCRIPTION 38621 CIRCULATION SYSTEM TRAFFIC SIGNALS - COLLEGE BOULEVARD AND TAMARACK AVENUE (N) PROJECT NO. PROJECT NAME PROJECT LOCATION MAP: CITY OF OCWNSIDE_ CITY OF f LOCATION \ PROJECT LOCATION: Intersection of College Boulevard and Tamarack Avenue (N). PROJECT DESCRIPTION: Installation of a three-leg, fully actuated traffic signal, including a type 170 controller, 200SA local intersection control program, video detection, battery back-up system, appurtenant signing and striping, and signal interconnect to adjacent controllers. PROJECT NEED: An elementary school was constructed at Tamarack Avenue east of College Boulevard. In addition, at some time in the future, College Boulevard will be opened to the north to the City of Oceanside, which will be a direct connection to the Highway 78 corridor. The installation of this traffic signal will assign the right-of-way for both motorists and pedestrians entering and crossing at the intersection. FINANCING: Purpose Design Construction Admin/Inspection Total Cost = Annual Operating Cost = $5,000 Estimated Cost Funding Source $8,000 $180,000 $22,000 $210,000 GCC GCC GCC Page 207 Col tarn II II 11 II II ! 1 i i t i i i i i i i t : i f i j i i r i i i i \ i i i \ i i i i i i i i CAPITAL PROJECT DESCRIPTION 38991 CIRCULATION SYSTEM TRAFFIC SIGNALS - EL CAMINO REAL / PLAZA DRIVE / MARRON ROAD / HOSP WAY PROJECT NAME PROJECT NO. PROJECT LOCATION MAP: SIGNAL LOCATION PROJECT LOCATION: Signalized intersections of El Camino Real and Plaza Drive, El Camino Real and Marron Road, and El Camino Real and Hosp Way. PROJECT DESCRIPTION: Design and rebuild existing signalized intersections to include all signal appurtenances and to meet ADA requirements. Repair concrete and rebuild a portion of Marron Road east of El Camino Real. PROJECT NEED: Underground signal facilities at this location have deteriorated to the point where conductors can no longer be pulled through the system. This project will reduce the need for future maintenance and restore the ability for maintenance crews to make future repairs should equipment become damaged or malfunction. Pull boxes and signal poles require location for installation of ADA pedestrian ramps. Replacing a cross-gutter in Marron Road will improve the driving conditions. FINANCING: Purpose Design Construction Total Cost = Estimated Cost $70,000 $1,130,000 $1,200,000 Funding Source TransNet-Local TransNet-Local ECRrehab Page 208 CAPITAL PROJECT DESCRIPTION CIRCULATION SYSTEM TRAFFIC SIGNALS - EL CAMINO REAL AND POINSETTIA LANE PROJECT NAME 38001 PROJECT NO. PROJECT LOCATION MAP:PROJECT LOCATION: Intersection of El Camino Real and Poinsettia Lane. PROJECT DESCRIPTION: Installation of a four-leg, fully actuated traffic signal, including a type 170 controller, 200SA local intersection control program, video detection, battery back-up system, appurtenant signing and striping, and signal interconnect to adjacent controllers. PROJECT NEED: Needed to comply with Growth Management Standards. The installation of this traffic signal will assign the right-of-way for both motorists and pedestrians entering and crossing at the intersection. FINANCING: Purpose Design Construction Admin/Inspection Total Cost = Estimated Cost Funding Source $8,000 $180,000 $16,250 $204,250 PFF PFF PFF ECR3 Page 209 • IN II II II 11 It • * II I * §a I • i II I i I! II II i i i i i s f i i ! r i i i i i i CAPITAL PROJECT DESCRIPTION I 1 1 I } I ! ! i ! ! 38451 CIRCULATION SYSTEM TRAFFIC SIGNALS - EL CAMINO REAL CORRIDOR STUDY PROJECT NAME PROJECT NO. PROJECT LOCATION MAP:PROJECT LOCATION: Along El Camino Real from SR78 to Marron Road. PROJECT DESCRIPTION: This project will study and analyze the existing traffic patterns along El Camino Real in the proximity of State Highway 78 to determine what, if any, potential actions can be taken to reduce existing traffic congestion levels. PROJECT NEED: The project is needed to help mitigate traffic congestion on El Camino Real. FINANCING: Purpose Estimated Cost Funding Source Study/Report $29,000 GCC Total Cost = $29,000 Ecrcorr Page 210 CAPITAL PROJECT DESCRIPTION 36461 CIRCULATION SYSTEM TRAFFIC SIGNALS - FARADAY AVENUE AND CANNON ROAD PROJECT NO. PROJECT NAME PROJECT LOCATION MAP:PROJECT LOCATION: Intersection of Cannon Road and Faraday Avenue. PROJECT DESCRIPTION: Installation of a 4-phase, fully actuated traffic signal, including a Type 170 controller and 176 intersection control program. Project will be constructed as part of the Faraday Avenue Extension street project. See the Faraday Avenue Extension street project Technical Appendix sheet for full comprehensive project funding. PROJECT NEED: Needed to comply with Growth Management Standards. Installation will occur when traffic signal warrants are met. FINANCING: Purpose Estimated Cost Funding Source Design/Construction $125,000 PFF Total Cost = $125,000 CANNONTS Page 211 I I I I II 1II II II II II II • 1 I 1 I 1 I ! I I 1 I I I 1 f S [ 3 I S I 1 I I I I I I I 1 CAPITAL PROJECT DESCRIPTION I J I 1 I \ i I NONE CIRCULATION SYSTEM TRAFFIC SIGNALS - FARADAY AVENUE AND CAMINO HILLS DRIVE PROJECT NO. PROJECT NAME PROJECT LOCATION MAP: P&OM/V? PROJECT LOCATION: Intersection of Faraday Avenue and Camino Hills Drive. PROJECT DESCRIPTION: Installation of a three-leg, fully actuated traffic signal, including a type 170 controller, 200SA local intersection control program, video detection, battery back-up system, appurtenant signing and striping, and signal interconnect to adjacent controllers. PROJECT NEED: A Caltrans traffic signal warrant has been met. The intersection is listed on the Traffic Signal Qualification List of the City's 2004 Traffic Signal Evaluation Policy. The installation of this traffic signal will assign the right-of-way for both motorists and pedestrians entering and crossing at this intersection. FINANCING: Purpose Design Construction Admin/Inspection Total Cost = Estimated Cost $8,000 $165,000 $12,000 $185,000 Funding Source GCC GCC GCC Faraday Page 212 CAPITAL PROJECT DESCRIPTION NONE CIRCULATION SYSTEM TRAFFIC SIGNALS - FARADAY AVENUE AND ORION STREET PROJECT NO. PROJECT NAME PROJECT LOCATION MAP:PROJECT LOCATION: At the intersection of the above named streets. PROJECT DESCRIPTION: Installation of a four-leg, fully actuated traffic signal, including a type 170 controller, 200SA local intersection control program, video detection, battery back-up system, appurtenant signing and striping, and signal interconnect to adjacent controllers. PROJECT NEED: Needed to comply with Growth Management Standards. The installation of this traffic signal will assign the right-of-way for both motorists and pedestrians entering and crossing at the intersection. FINANCING: Purpose Design Construction Admin/Inspection Total Cost = Estimated Cost Funding Source $8,000 $165,000 $12,000 $185,000 TIP TIP TIP FARAORIO Page 213 I 1 ii • m • • i m • • in ii i • i • • I 1 1 I I i I lI 1 I 1 I ! I I I I I i I I f I I I I l CAPITAL PROJECT DESCRIPTION i i i \ i i i i r i 36211 CIRCULATION SYSTEM TRAFFIC SIGNALS - FARADAY AVENUE AND PRIESTLY DRIVE PROJECT NAME PROJECT NO. PROJECT LOCATION MAP:PROJECT LOCATION: At the intersection of Faraday Avenue and Priestly Drive. PROJECT DESCRIPTION: Installation of a three-leg, fully actuated traffic signal, including a type 170 controller, 200SA local intersection control program, video detection, battery back-up system, appurtenant signing and striping, and signal interconnect to adjacent controllers. PROJECT NEED: Caltrans signal warrants have been met. The intersection is listed on the qualification list of the City's Traffic Signal Evaluation Policy. The installation of this traffic signal will assign the right-of-way for both motorists and pedestrians entering and crossing at the intersection. FINANCING: Purpose Design Construction Admin/Inspection Total Cost = Estimated Cost $8,000 $180,000 $22,000 $210,000 Funding Source Gas Tax Gas Tax Gas Tax FDYPRIES Page 214 CAPITAL PROJECT DESCRIPTION NONE CIRCULATION SYSTEM TRAFFIC SIGNALS - FARADAY AVENUE AND RUTHERFORD ROAD PROJECT NO. PROJECT NAME PROJECT LOCATION MAP:PROJECT LOCATION: At the intersection of Faraday Avenue and Rutherford Road. PROJECT DESCRIPTION: Installation of a four-leg, fully actuated traffic signal, including a type 170 controller, 200SA local intersection control program, video detection, battery back-up system, appurtenant signing and striping, and signal interconnect to adjacent controllers. PROJECT NEED: Caltrans traffic signal warrants have been met. The intersection is listed on the qualification list of the City's Traffic Signal Evaluation Policy. The installation of this traffic signal will assign the right-of-way for both motorists and pedestrians entering and crossing at the intersection. FINANCING: Purpose Design Construction Admin/Inspection Total Cost = Estimated Cost Funding Source $8,000 $165,000 $12,000 $185,000 GCC GCC GCC Faruthfd Page 215 II II II 11 II 11 II 11 II I I II II I I I 1 I I t I 1 I I I I I I I I ! 1 ! I ! I I I I I I CAPITAL PROJECT DESCRIPTION I 1 I 1 f ! I ! I I NONE CIRCULATION SYSTEM TRAFFIC SIGNALS - LA COSTA AVENUE AND ESFERA STREET PROJECT NO. PROJECT NAME PROJECT LOCATION MAP:PROJECT LOCATION: La Costa Avenue and Esfera Street. PROJECT DESCRIPTION: Installation of a three-leg, fully actuated traffic signal, including a type 170 controller, 200SA local intersection control program, video detection, battery back-up system, appurtenant signing and striping, and signal interconnect to adjacent controllers. PROJECT NEED: The installation of this traffic signal will assign the right-of-way for both motorists and pedestrians entering and crossing at the intersection. FINANCING: Purpose Design Construction Admin/Inspection Total Cost = Estimated Cost $8,000 $165,000 $12,000 $185,000 Funding Source GCC GCC GCC La_costa Page 216 CAPITAL PROJECT DESCRIPTION CIRCULATION SYSTEM TRAFFIC SIGNALS - LA COSTA AVENUE AND LEVANTE STREET PROJECT NAME 39381 PROJECT NO. PROJECT LOCATION MAP:PROJECT LOCATION: La Costa Avenue and Levante Street. PROJECT DESCRIPTION: Installation of a three-leg, fully actuated traffic signal, including a type 170 controller, 200SA local intersection control program, video detection, battery back-up system, appurtenant signing and striping, and signal interconnect to adjacent controllers. PROJECT NEED: The installation of this traffic signal will assign the right-of-way for both motorists and pedestrians entering and crossing at the intersection. FINANCING: Purpose Design Construction Admin/Inspection Total Cost = Estimated Cost $8,000 $180,000 $22,000 $210,000 Funding Source GCC GCC GCC Lacosta_2 Page 217 iiliiiiiiiiiiiiil • i • 1 11 t • 11 ii 11 11 ii • f I I I I i f i 1 I I I I 1 ! 1 f ! I 1 ! 1 I 1 I I I I CAPITAL PROJECT DESCRIPTION i t i i t i i NONE i i CIRCULATION SYSTEM TRAFFIC SIGNALS - LA COSTA AVENUE AND NUEVA CASTILLA WAY PROJECT NO. PROJECT NAME PROJECT LOCATION MAP: SIGNAL LOCATION PROJECT LOCATION: Intersection of La Costa Avenue and Nueva Castilla Way. PROJECT DESCRIPTION: Installation of a four-leg, fully actuated traffic signal, including a type 170 controller, 200SA local intersection control program, video detection, battery back-up system, appurtenant signing and striping, and signal interconnect to adjacent controllers. PROJECT NEED: Caltrans traffic signal warrants have been met. The intersection is listed on the qualification list of the City's Traffic Signal Evaluation Policy. The installation of this traffic signal will assign the right-of-way for both motorists and pedestrians entering and crossing at the intersection. FINANCING: Purpose Design Construction Admin/Inspection Total Cost = Estimated Cost Funding Source $8,000 $165,000 $12,000 $185,000 GCC GCC GCC LCANueva Page 218 CAPITAL PROJECT DESCRIPTION NONE CIRCULATION SYSTEM TRAFFIC SIGNALS - MELROSE DRIVE AND LA COSTA AVENUE PROJECT NO. PROJECT NAME PROJECT LOCATION MAP: MELROSE PROJECT LOCATION: Intersection of Melrose Drive and La Costa Avenue. PROJECT DESCRIPTION: Installation of a four-leg, fully actuated traffic signal, including a type 170 controller, 200SA local intersection control program, video detection, battery back-up system, appurtenant signing and striping, and signal interconnect to adjacent controllers. PROJECT NEED: Needed to comply with Growth Management Standards. The installation of this traffic signal will assign the right-of-way for both motorists and pedestrians entering and crossing at the intersection. FINANCING: Purpose Design Construction Admin/Inspection Total Cost = Estimated Cost Funding Source $8,000 $165,000 $12,000 $185,000 PFF PFF PFF I I 1 1 t I I 1 I I I I I I I I t • Page 219 • • t § ! I I I I i I i I 1liEIfiflfiflflflfi CAPITAL PROJECT DESCRIPTION f i t i i i i i { i NONE CIRCULATION SYSTEM TRAFFIC SIGNALS - MONROE STREET AND HOSP WAY PROJECT NAME PROJECT NO. PROJECT LOCATION MAP: SIGNAL LOCATION PROJECT LOCATION: Intersection of Monroe Street and Hosp Way. PROJECT DESCRIPTION: Installation of a four-leg, fully actuated traffic signal, including a type 170 controller, 200SA local intersection control program, video detection, battery back-up system, appurtenant signing and striping, and signal interconnect to adjacent controllers. PROJECT NEED: A Caltrans traffic signal warrant has been met. The intersection is listed on the Traffic Signal Qualification List of the City's 2004 Traffic Signal Evaluation Policy. The installation of this traffic signal will assign the right-of-way for both motorists and pedestrians entering and crossing at this intersection. FINANCING: Purpose Design Construction Admin/Inspection Total Cost = Estimated Cost $8,000 $165,000 $12,000 $185,000 Funding Source GCC GCC GCC Monroe Page 220 CAPITAL PROJECT DESCRIPTION 36441 CIRCULATION SYSTEM TRAFFIC SIGNALS - PALOMAR AIRPORT ROAD AND MELROSE DRIVE PROJECT NO. PROJECT NAME PROJECT LOCATION MAP:PROJECT LOCATION: Intersection of Palomar Airport Road and Melrose Drive. PROJECT DESCRIPTION: Installation of an 8-phase, fully actuated traffic signal, including a Type 170 controller and 176 intersection control program. Modify existing traffic signal to accommodate construction of north leg of Melrose Avenue. PROJECT NEED: Needed to comply with Growth Management Standards. FINANCING: Purpose Estimated Cost Funding Source Design/Construction Admin/Inspection Total Cost = $200,000 $50,000 $250,000 PFF PFF PARMELRO Page 221 • I I I I I I I I I I I I I I I ! 1 f i I I I 1 1I I 1 I 1 f ) f I f I I 1 f I CAPITAL PROJECT DESCRIPTION i i f i f i i i i t i 39351 CIRCULATION SYSTEM TRAFFIC SIGNALS - PASEO DEL NORTE AND CAR COUNTRY DRIVE PROJECT NAME PROJECT NO. PROJECT LOCATION MAP: \ PROJECT LOCATION: At the intersection of Paseo Del Norte and Car Country Drive. PROJECT DESCRIPTION: Installation of a three-leg, fully actuated traffic signal, including a type 170 controller, 200SA local intersection control program, video detection, battery back-up system, appurtenant signing and striping, and signal interconnect to adjacent controllers. PROJECT NEED: Caltrans signal warrants have been met. The intersection is listed on the qualification list of the City's 2004 Traffic Signal Evaluation Policy. The installation of this traffic signal will assign the right-of-way for both motorists and pedestrians entering and crossing at the intersection. FINANCING: Purpose Design Construction Admin/Inspection Total Cost = Annual Operating Cost: = $5,000 Estimated Cost $8,000 $180,000 $22,000 $210,000 Funding Source Gas Tax Gas Tax Gas Tax PDN_CCDR.doc Page 222 CAPITAL PROJECT DESCRIPTION 39391 CIRCULATION SYSTEM TRAFFIC SIGNALS - POINSETTIA LANE AND BLACK RAIL ROAD PROJECT NO. PROJECT NAME PROJECT LOCATION MAP:PROJECT LOCATION: At the intersection of Poinsettia Lane and Black Rail Road. PROJECT DESCRIPTION: Installation of a four-leg, fully actuated traffic signal, including a type 170 controller, 200SA local intersection control program, video detection, battery back-up system, appurtenant signing and striping, and signal interconnect to adjacent controllers at Poinsettia Lane and Aviara Parkway and Poinsettia Lane and Ambrosia Lane. PROJECT NEED: Future traffic on Poinsettia Lane will increase once the roadway extends from its current terminus at Black Rail Road eastward to El Camino Real, thereby necessitating the installation of a traffic signal at this location. The installation of this traffic signal will assign the right-of-way for both motorists and pedestrians entering and crossing at the intersection. FINANCING: Purpose Design Construction Admin/Inspection Total Cost = Annual Operating Cost: = $5,000 Estimated Cost $8,000 $180,000 $22,000 $210,000 Funding Source GCC GCC GCC Poin_brr •iiiaiaiiiiiifiii • i • m Page 223 • i m • m i i i i i i I i 1 I I ! I } r ! f ! i 1 I I I I I I I \ CAPITAL PROJECT DESCRIPTION i i i i i j i \ i i NONE CIRCULATION SYSTEM TRAFFIC SIGNALS - PQINSETTIA LANE AND BRIGANTINE ROAD PROJECT NO. PROJECT NAME PROJECT LOCATION MAP:PROJECT LOCATION: Intersection of Poinsettia Lane and Brigantine Road. PROJECT DESCRIPTION: Installation of a three-leg, fully actuated traffic signal, including a type 170 controller, 200SA local intersection control program, video detection, battery back-up system, appurtenant signing and striping, and signal interconnect to adjacent controllers. PROJECT NEED: Required to accommodate the safe and efficient flow of traffic from Brigantine Drive onto Poinsettia Lane which is classified as a major arterial in the City's Circulation Element. The need for the signal is created by the development of adjacent properties. Early developing properties which do not trigger the construction of the signal are required to contribute a fair share contribution of the total cost to install the traffic signal. FINANCING: Purpose Design Construction Admin/Inspection Total Cost = Estimated Cost $8,000 $165,000 $12,000 $185,000 Funding Source GCC GCC GCC Poin_brig Page 224 CAPITAL PROJECT DESCRIPTION 39461 CIRCULATION SYSTEM TRAFFIC SIGNALS - POINSETTIA LANE AND EL FUERTE STREET PROJECT NO. PROJECT NAME PROJECT LOCATION MAP:PROJECT LOCATION: Intersection of Poinsettia Lane and El Fuerte Street. PROJECT DESCRIPTION: Installation of a four-leg, fully actuated traffic signal, including a type 170 controller, 200SA local intersection control program, video detection, battery back-up system, appurtenant signing and striping, and signal interconnect to adjacent controllers. PROJECT NEED: Needed to comply with Growth Management Standards. The installation of this traffic signal will assign the right-of-way for both motorists and pedestrians entering and crossing at the intersection. FINANCING: Purpose Design Construction Admin/Inspection Estimated Cost Funding Source $8,000 $180,000 $22,000 PFF PFF PFF Total Cost = $210,000 Annual Operating Cost: = $5,000 POINSET1.doc Page 225 11 it ft ii •• • * t t • • ii t i ii it •• t f i f ! I i f I I I I 1 f ! f i f ! f I f 1 f I 1 I I 1 CAPITAL PROJECT DESCRIPTION I i I I f ! i ! I f CIRCULATION SYSTEM TRAFFIC SIGNALS - POINSETTIA LANE AND MELROSE DRIVE PROJECT NO. PROJECT NAME PROJECT LOCATION MAP: 'SIGNAL LOCATION PROJECT LOCATION: Intersection of Poinsettia Lane and Melrose Drive. PROJECT DESCRIPTION: Installation of a 4-phase, fully actuated traffic signal, including a Type 170 controller and 176 intersection control program. PROJECT NEED: Needed to comply with Growth Management Standards. FINANCING: Purpose Design Construction Admin/Inspection Total Cost = Estimated Cost Funding Source $8,000 $165,000 $12,000 $185,000 PFF PFF PFF POINMELR.doc Page 226 CAPITAL PROJECT DESCRIPTION 38491 CIRCULATION SYSTEM TRAFFIC SIGNALS - POINSETTIA LANE AND PASEO ESCUELA PROJECT NO. PROJECT NAME PROJECT LOCATION MAP:PROJECT LOCATION: At the intersection of Poinsettia Lane and Paseo Escuela within Carrillo Ranch. PROJECT DESCRIPTION: Installation of a four-leg, fully actuated traffic signal, including a type 170 controller, 200SA local intersection control program, video detection, battery back-up system, appurtenant signing and striping, and signal interconnect to adjacent controllers. PROJECT NEED: Require to provide safe ingress and egress into the San Marcos Elementary School site within the Rancho Carrillo Master Plan project. The signal was not made a condition of the master plan of the adjacent planning area project. The signal should be installed prior to the extension of Poinsettia Lane west to El Fuerte Street or El Camino Real. The installation of this traffic signal will assign the right-of-way for both motorists and pedestrians entering and crossing at the intersection. FINANCING: Purpose Design Construction Admin/Inspection Estimated Cost $8,000 $180,000 $22,000 Funding Source Gas Tax Gas Tax Gas Tax Total Cost = Annual Operating Cost: = $5,000 $210,000 Poinsjn Page 227 • t i 11 t i ii ii ii ii is • • t m • • 11 • • ii i i i i i i f i f i f i f t r ; f i f i f i f i t i f i CAPITAL PROJECT DESCRIPTION i i i i t i t i ! i 38821 CIRCULATION SYSTEM TRAFFIC SIGNALS - POINSETTIA LANE AND SNAPDRAGON DRIVE PROJECT NO. PROJECT NAME PROJECT LOCATION MAP: SIGNAL LOCATION -o PROJECT LOCATION: At the intersection of Poinsettia Lane and Snapdragon Drive. PROJECT DESCRIPTION: Installation of a three-leg, fully actuated traffic signal, including a type 170 controller, 200SA local intersection control program, video detection, battery back-up system, appurtenant signing and striping, and signal interconnect to adjacent controllers. PROJECT NEED: Caltrans signal warrants have been met. The intersection is listed on the qualification list of the City's 2004 Traffic Signal Evaluation Policy. The installation of this traffic signal will assign the right-of-way for both motorists and pedestrians entering and crossing at the intersection. FINANCING: Purpose Design Construction Admin/Inspection Estimated Cost $8,000 $170,000 $12,000 Funding Source Gas Tax Gas Tax Gas Tax Total Cost = $190,000 Annual Operating Cost: = $5,000 POINSNAP.doc Page 228 CAPITAL PROJECT DESCRIPTION CIRCULATION SYSTEM TRAFFIC SIGNALS - RANCHO SANTA FE ROAD AND CALLE JUNIPERO (FORMERLY MELROSE DRIVE SOUTH) PROJECT NAME NONE PROJECT NO. PROJECT LOCATION MAP:PROJECT LOCATION: Intersection of Rancho Santa Fe Road and future Calle Junipero, formerly Melrose Drive South. PROJECT DESCRIPTION: Installation of a three-leg, fully actuated traffic signal, including a type 170 controller, 200SA local intersection control program, video detection, battery back-up system, appurtenant signing and striping, and signal interconnect to adjacent controllers. PROJECT NEED: Needed to comply with Growth Management Standards. The installation of this traffic signal will assign the right-of-way for both motorists and pedestrians entering and crossing at the intersection. FINANCING: Purpose Design Construction Admin/Inspection Total Cost = Estimated Cost Funding Source $8,000 $165,000 $12,000 $185,000 PFF PFF PFF RSFMELRO Page 229 I I II II II II II 11 II i i i I f i I i t i i ! I I f ! I I I I I I I I I 1 CAPITAL PROJECT DESCRIPTION I i i i I i I i f i I i 34061 CIRCULATION SYSTEM TRAFFIC SIGNALS - RANCHO SANTA FE ROAD AND SAN ELUO ROAD PROJECT NO. (FORMERLY QUESTHAVEN ROAD) PROJECT NAME PROJECT LOCATION MAP:PROJECT LOCATION: Intersection of Rancho Santa Fe Road and San Elijo Road, formerly Questhaven Road. PROJECT DESCRIPTION: Installation of a three-leg, fully actuated traffic signal, including a type 170 controller, 200SA local intersection control program, video detection, battery back-up system, appurtenant signing and striping, and signal interconnect to adjacent controllers. The City of San Marcos is responsible for 1/3 share of this signal. Staff will pursue a cost sharing agreement with the City of San Marcos. PROJECT NEED: Needed to comply with Growth Management Standards. The installation of this traffic signal will assign the right-of-way for both motorists and pedestrians entering and crossing at the intersection. FINANCING: Purpose Construction Total Cost = Estimated Cost $125,000 $125,000 Funding Source GCC RSFQUEST Page 230 CAPITAL PROJECT DESCRIPTION 39401 CIRCULATION SYSTEM TRAFFIC SIGNALS - TAMARACK AVENUE AND PONTIAC DRIVE PROJECT NO. PROJECT NAME PROJECT LOCATION MAP:PROJECT LOCATION: Intersection of Tamarack Avenue and Pontiac Drive. PROJECT DESCRIPTION: Installation of a three-leg, fully actuated traffic signal, including a type 170 controller, 200SA local intersection control program, video detection, battery back-up system, appurtenant signing and striping, and signal interconnect to adjacent controllers. PROJECT NEED: A Caltrans traffic signal warrant has been met. The intersection is listed on the Traffic Signal Qualification List of the City's 2004 Traffic Signal Evaluation Policy. The installation of this traffic signal will assign the right-of-way for both motorists and pedestrians entering and crossing at this intersection. FINANCING: Purpose Design Construction Admin/Inspection Total Cost = Estimated Cost $8,000 $180,000 $22,000 $210,000 Funding Source GCC GCC GCC Annual Operating Cost = $5,000 Tam&pont Page 231 II • • II 11 II 11 • • 11 II I I • II II II II II II • i i i i i i i i i firiiififiiiiiiiii CAPITAL PROJECT DESCRIPTION i i t i i i i i i i NONE CIRCULATION SYSTEM TRAFFIC SIGNALS - TAMARACK AVENUE AND VALLEY STREET PROJECT NO. PROJECT NAME PROJECT LOCATION MAP:PROJECT LOCATION: Intersection of Tamarack Avenue and Valley Street. PROJECT DESCRIPTION: Installation of a four-leg, fully actuated traffic signal, including a type 170 controller, 200SA local intersection control program, video detection, battery back-up system, appurtenant signing and striping, and signal interconnect to adjacent controllers. PROJECT NEED: A Caltrans traffic signal warrant has been met. The intersection is listed on the Traffic Signal Qualification List of the City's 2004 Traffic Signal Evaluation Policy. The installation of this traffic signal will assign the right-of-way for both motorists and pedestrians entering and crossing at this intersection. This is an elementary school pedestrian crossing. FINANCING: Purpose Design Construction Admin/Inspection Total Cost = Estimated Cost $8,000 $165,000 $12,000 $185,000 Funding Source GCC GCC GCC Tarn vail Page 232 CAPITAL PROJECT DESCRIPTION NONE CIRCULATION SYSTEM TRAFFIC SIGNALS - TAMARACK AVENUE AND GARFIELD STREET PROJECT NO. PROJECT NAME PROJECT LOCATION MAP: SGNAL LOCATION PROJECT LOCATION: Intersection of Tamarack Avenue and Garfield Street. PROJECT DESCRIPTION: Installation of a four-leg, fully actuated traffic signal, including a type 170 controller, 200SA local intersection control program, video detection, battery back-up system, appurtenant signing and striping, and signal interconnect to adjacent controllers. PROJECT NEED: Needed to meet Growth Management Standards and future traffic signal warrants. The installation of this traffic signal will assign the right-of-way for both motorists and pedestrians entering and crossing at the intersection. FINANCING: Purpose Design Construction Admin/Inspection Total Cost = Estimated Cost Funding Source $8,000 $165,000 $12,000 $185,000 PFF PFF PFF TAMGAR.doc Page 233 • a ii ii ii ii ii • • • • f i • i STREET PROJECTS I I I J i t i i I i i I I i i I i t i i i i i i i i i i i i i i i i \ FUNDING MATRIX FOR STREET PROJECTS PROJ NO. 36731 39221 35951 36741 39331 31842 31841 31844 31845 38141 34371 39471 39191 38541 36171 35571 36362 38791 36071 36431 39091 39081 NEW NEW 39571 39291 36222 35931 38521 PROJECT TITLE AVENIDA ENCINAS WIDENING - SOUTH OF PALOMAR AIRPORT RD BTD#2 POINSETTIA LANE - REACH "C" BTD#2/POINSETTIA LANE - REACH E (PARTIAL FUNDING) BTD#2/POINSETTIA LANE - REACHES A & B AND AVIARA PKWY BTD#2/POINSETTIA LANE - REACHES F & G BTD#3 CANNON ROAD - EL CAMINO TO FROST (REIMB.) BTD#3 CANNON ROAD - FROST TO FARADAY (REIMB.) BTD#3 CANNON ROAD WEST BTD#3 CANNON ROAD WEST BTD#3 CANNON ROAD WEST CANNON ROAD REACH 4B CANNON ROAD WIDENING FROM I-5 TO PASEO DEL NORTE CARLSBAD BLVD AT BREAKWATER ROAD - LEFT TURN LANE CARLSBAD BOULEVARD ENCINAS CREEK BRIDGE REPLACEMENT CARLSBAD BOULEVARD ENCINAS CREEK BRIDGE REPLACEMENT CARLSBAD BOULEVARD MEDIAN-TAMARACK AVE TO PINE AVE CARLSBAD BOULEVARD PEDESTRIAN ACCESS STUDY CARLSBAD BOULEVARD REALIGNMENT - PHASE I REIMBURSEMENT CARLSBAD BOULEVARD RETROFIT OVER SDNR CARLSBAD BOULEVARD WIDENING - CANNON TO MANZANO CARLSBAD VILLAGE DRIVE WIDENING COLLEGE BOULEVARD REACH A AND CANNON REACH 4A COLLEGE/CANNON ASSESSMENT DISTRICT EL CAMINO REAL AND CARLSBAD VILLAGE DRIVE EL CAMINO REAL AND FARADAY AVENUE EL CAMINO REAL AT AVIARA PARKWAY/ALGA ROAD EL CAMINO REAL MEDIANS EL CAMINO REAL MEDIANS - LA COSTA EL CAMINO REAL WIDENING - RHO CSBD TO SUNNY CR (LOAN) EL CAMINO REAL WIDENING - LA COSTA AVE TO ARENAL RD EL CAMINO REAL WIDENING - LISA ST TO CRESTVIEW DR (LOAN) EL CAMINO REAL WIDENING - NORTH OF COUGAR DRIVE (LOAN) EL CAMINO REAL WIDENING - TAMARACK AVE TO CHESTNUT AVE EL CAMINO REAL WIDENING - S CHESTNUT FARADAY AVENUE AND MELROSE DRIVE EXTENSIONS FARADAY AVENUE MITIGATION - SOUTH OF CANNON I-5 AND LA COSTA AVENUE AUXILLARY LANES MELROSE DRIVE AND ALGA ROAD OLIVENHAIN ROAD WIDENING MITIGATION MONITORING FUNDING SOURCE TIP BTD#2 BTD#2 BTD#2 BTD#2 BTD#3 BTD#3 TRANSNET-HWY CFD#1 TIP TRANSNET-HWY TIP REDVL SCCRDA REDVL SCCRDA FED GRNT PFF GCC GAS TAX TRANSNET-LOC TIP TIP OTHER ASMT DIST TIP TIP TIP PFF PFF TRANSNET-LOC TIP TRANSNET-LOC TRANSNET-LOC TIP TIP OTHER CFD#1 CFD#1 TIP CFD#2 TOTAL BUDGET 870,000 3,122,900 3,790,000 7,274,823 1 ,841 ,090 925,000 5,675,009 4,660,000 6,534,601 1,160,000 1 ,761 ,000 210,725 155,000 451,000 1,804,000 1,237,177 105,000 1,830,000 1,100,000 2,000,000 1,260,000 1,713,000 425,000 320,000 881,000 250,000 1,759,500 90,500 1 ,800,000 450,000 959,000 493,000 1,382,708 522,115 1 ,021 ,826 5,500,000 1,500,000 480,000 15,000 YEAR OF SERVICE 2006 2006 FUTURE YEAR BUDGET AMOUNTS YEAR1 2004-2005 350,000 925,000 155,000 1 96,000 55,000 140,000 150,000 493,000 1,382,708 YEAR 2 2005-2006 1 ,804,000 1,308,000 708,430 YEAR 3 2006-2007 600,000 959,000 YEAR 4 2007-2008 YEARS 2008-2009 YEAR 6-10 2010-2014 870,000 1,237,177 320,000 250,000 450,000 BUILDOUT 2015-2020 3,440,000 2,500,000 1,000,000 400,000 2,000,000 1,260,000 850,000 1,500,000 480,000 Page 234 FUNDING MATRIX FOR STREET PROJECTS PROJ NO. 34011 39481 38111 36671 36791 38681 36892 38601 31906 39071 38801 38831 39531 39281 38951 PROJECT TITLE PALOMAR AIRPORT ROAD AND COLLEGE BOULEVARD PALOMAR AIRPORT ROAD MITIGATION MAINTENANCE (No TA) PALOMAR AIRPORT ROAD WIDENING AND BRIDGE RECONSTRUCT. PALOMAR AIRPORT ROAD WIDENING AT PASEO DEL NORTE PAVEMENT MANAGEMENT PROGRAM PAVEMENT MANAGEMENT PROGRAM PAVEMENT MANAGEMENT PROGRAM PAVEMENT MANAGEMENT PROGRAM POINSETTIA LANE EAST OF EL CAMINO REAL FINANCING PROGRAM POINSETTIA LANE WIDENING (PASEO DEL NORTE TO BATIQUITOS) RANCHO SANTA FE ROAD AND OLIVENHAIN IMPROVEMENTS RANCHO SANTA FE ROAD NORTH - PHASE I RANCHO SANTA FE ROAD NORTH - PHASE II (BRIDGE) RANCHO SANTA FE ROAD SOUTH SIDEWALK/STREET CONSTRUCTION PROGRAM SIDEWALK/STREET CONSTRUCTION PROGRAM TRAFFIC MONITORING PROGRAM UNDERGROUND DISTRICT 17 - HARDING, ROOSEVELT FUNDING SOURCE TIP ASMT DIST REDVLSCCRDA TIP TRANSNET-LOC GAS TAX IRF ST GRANT ASMT DIST TIP CFD#2 CFD#2 CFD#2 CFD#2 TIF T1F TIF GCC TOTAL BUDGET 160,000 292,000 500,000 525,000 23,989,348 39,621,088 7,500,000 1,089,065 72,432 1 ,870,000 3,800,000 26,284,656 18,419,000 1,350,000 834,259 3,126,822 1,210,611 509,800 YEAR OF SERVICE FUTURE YEAR BUDGET AMOUNTS YEAR1 2004-2005 500,000 45,000 3,470,000 500,000 35,000 300,000 70,000 509,800 YEAR 2 2005-2006 2,600,000 600,000 300,000 70,000 YEARS 2006-2007 2,500,000 800,000 300,000 70,000 YEAR 4 2007-2008 2,600,000 800,000 300,000 70,000 YEARS 2008-2009 1 ,370,000 2,230,000 300,000 70,000 YEAR 6-10 2010-2014 160,000 15,000,000 2,500,000 1 ,500,000 350,000 BUILDOUT 2015-2020 16,000,000 5,000,000 1 ,870,000 420,000 i n i m i i i i ii ii ii Page 235 I •• I f i i i i i i i I i iiiiiiiiiiiiiii CAPITAL PROJECT DESCRIPTION i i i i i i i i i NONE CIRCULATION SYSTEM STREET PROJECTS - AVENIDA ENCINAS WIDENING SOUTH OF PALOMAR AIRPORT ROAD PROJECT NAME PROJECT NO. PROJECT LOCATION MAP:PROJECT LOCATION: Along the west side of Avenida Encinas south of Palomar Airport Road adjacent to the San Diego Northern Railway property. PROJECT DESCRIPTION: Widen the west side of Avenida Encinas to full secondary arterial standards from Palomar Airport Road to approximately 800 feet south. The work includes placement of fill material and construction of new curbs, gutters, aggregate base, asphalt paving and striping. PROJECT NEED: Required to comply with Growth Management Standards. FINANCING: Purpose Estimated Cost Funding Source Design/Construction $870,000 TIP Total Cost = $870,000 AVENIDA Page 236 CAPITAL PROJECT DESCRIPTION CIRCULATION SYSTEM STREET PROJECTS - B&TD#2 POINSETTIA LANE - REACH "C" (BLACK RAIL ROAD TO ZONE 19 BOUNDARY) PROJECT NAME 36731 PROJECT NO. PROJECT LOCATION MAP:PROJECT LOCATION: Along future Poinsettia Lane from Black Rail Road to the existing terminus of Poinsettia Lane at the western boundary of Zone 19. PROJECT DESCRIPTION: Acquisition of full 102-foot width right-of-way for future Poinsettia Lane including necessary slope and construction easements. Full width grading of the right-of-way to major arterial standards including any necessary drainage and erosion control measures. Construction of two 18-foot paved traffic lanes on either side of a raised unimproved median. The project is part of the improvements funded by Bridge and Thoroughfare District No. 2 (B&TD#2). PROJECT NEED: Completion of this road segment combined with the road improvements to Poinsettia Lane and Cassia Road currently under design and/or construction will provide a complete road linkage from Interstate 5 to El Camino Real, thereby relieving some traffic on Palomar Airport Road and providing excellent access to the future Zone 19 park site. FINANCING: Purpose Design/Construction/ Land Acquisition Total Cost = Estimated Cost $3,122,900 $3,122,900 Funding Source B&TD #2 POINLANE Page 237 II II II II II II II •• I i J i i I I i i t i f ] f i f i r ; i i I i f I I ) i i I I CAPITAL PROJECT DESCRIPTION CIRCULATION SYSTEM STREET PROJECTS - B&TD #2 POINSETTIA LANE REACH "E" (CASSIA ROAD TO SKIMMER COURT) PROJECT NAME i i i i i i 39221 PROJECT NO. PROJECT LOCATION MAP: J PROJECT LOCATION: Along the future extension of Poinsettia Lane from its existing terminus at Cassia Road east to Skimmer Court. PROJECT DESCRIPTION: Partial funding for construction of Reach "E" of Poinsettia Lane including full width grading to major arterial standards, adequate drainage improvements necessary to protect the roadbed, and two 18-foot paved traffic lanes separated by a raised unimproved median. Also included within the project are all land acquisition and environmental mitigation costs. The project is part of the improvements funded by Bridge and Thoroughfare District No. 2 (B&TD#2). PROJECT NEED: Required pursuant to the City's Circulation Elements and Growth Management Program. FINANCING: Purpose Design/Construction Land Acquisition Total Cost = Estimated Cost $3,790,000 $3,790,000 Funding Source B&TD#2 B&TD#2E Page 238 CAPITAL PROJECT DESCRIPTION CIRCULATION SYSTEM STREET PROJECTS - B&TD#2 - POINSETTIA LANE REACHES "A" & " B" AND AVIARA PARKWAY PROJECT NAME 35951 PROJECT NO. PROJECT LOCATION MAP:PROJECT LOCATION: Along Poinsettia Lane from Aviara Parkway to Black Rail Road. PROJECT DESCRIPTION: Construction or reimbursement to developers for the construction of the outside two lanes of Poinsettia Lane to major arterial standards including the cost for full width grading and acquisition of right-of-way. The project is funded primarily from funds collected through formation of Bridge and Thoroughfare District No. 2 (B&TD#2). PROJECT NEED: Required to meet Growth Management Standards. FINANCING: Purpose Estimated Cost Design/Construct/Land Acquisition $7,274,823 Total Cost = $7,274,823 Funding Source B&TD #2 POINAVIA.doc Page 239 f i i i i till lilt II II II 11 ft * r i I i i i i i i i 1 i ! i i ? 1 j i ! i ] i i I i CAPITAL PROJECT DESCRIPTION i I i I i i i 36741 CIRCULATION SYSTEM STREET PROJECTS - B&TD #2 POINSETTIA LANE REACHES "F" & "G" (SKIMMER COURT TO EL CAMINO REAL) PROJECT NAME PROJECT NO. PROJECT LOCATION MAP: EACHG PROJECT LOCATION: Along the future extension of Poinsettia Lane from its existing terminus at the Zone 19/21 boundary east approximately 3,400 feet to El Camino Real. PROJECT DESCRIPTION: Reimbursement for construction of Reach "F" and "G" of Poinsettia Lane including full width grading to major arterial standards, adequate drainage improvements necessary to protect the roadbed, and two 18-foot paved traffic lanes separated by a raised unimproved median. Also included within the project are all land acquisition and environmental mitigation costs. The project is part of the improvements funded by Bridge and Thoroughfare District No. 2 (B&TD#2). PROJECT NEED: Required pursuant to the City's Circulation Elements and Growth Management Program. FINANCING: Purpose Design/Construction Land Acquisition Total Cost = Estimated Cost $1,841,090 $1,841,090 Funding Source B&TD#2 B&TD#2FG Page 240 CAPITAL PROJECT DESCRIPTION CIRCULATION SYSTEM STREET PROJECTS - B&TD #3 - CANNON ROAD WEST PROJECT NAME 39331, 31841,31842, 31844 & 31845 PROJECT NO. PROJECT LOCATION MAP:PROJECT LOCATION: Future Cannon Road from Lego Drive to El Camino Real along the south side of the Agua Hedionda Lagoon. PROJECT DESCRIPTION: Construct a 4-lane major arterial road from Lego Drive to El Camino Real. Work includes full width grading, curb and gutter, base and paving, raised landscaped median, sidewalks and streetlights, as well as a dual 450 foot long, five span, pre-stressed concrete bridge over the Macario Canyon drainage channel and a 130 foot single span concrete bridge across Agua Hedionda Creek at El Camino Real. In addition, the project includes the widening of El Camino Real north and south of the future Cannon Road intersection to accommodate dual left turn lanes on to Cannon Road. The El Camino Real widening work includes median installation and widening of the existing El Camino Real bridge over Agua Hedionda Creek to provide for pedestrian access. NOTE: The eastern portion of Cannon Road West may be constructed entirely or in phases by the adjacent land developer. In such case, the City may reimburse the developer for eligible work in accordance with a Council approved reimbursement agreement. PROJECT NEED: Required to comply with Growth Management Standards and to complete a vital arterial roadway identified in the Circulation Element of the General Plan. FINANCING: Purpose Construction Construction Construction ECR Intersection Total Cost = Estimated Cost $4,660,000 $6,534,601 $6,600,009 $1,160,000 $18,954,610 Funding Source TransNet/Highway CFD#1 B&TD #3 TIF CANNWEST.doc Page 241 • •ii ii II 11 li 11 • a lim i •i • II ii ! I 1 I I i J i I I I f i i i i \ i i i i I i i i i i CAPITAL PROJECT DESCRIPTION i I i i i I i I i i i i 38141 CIRCULATION SYSTEM STREET PROJECTS - CANNON ROAD REACH 4B COLLEGE BOULEVARD TO OCEANSIDE PROJECT NAME PROJECT NO. PROJECT LOCATION MAP:PROJECT LOCATION: Along Cannon Road from future College Boulevard to the Carlsbad/Oceanside city limits. PROJECT DESCRIPTION: Preliminary design of Reach 4 of Cannon Road to full major arterial standards, including all required environmental mitigation costs. PROJECT NEED: Required pursuant to the City Circulation Element and to comply with the Growth Management Circulation Standards. Since the project passes through the existing coastal sage habitat preserve area, it is not included as a financing requirement of any of the local facilities management plans. FINANCING: Purpose Preliminary Design Total Cost = Estimated Cost $1,761,000 $1,761,000 Funding Source TransNet Hwy Cannon34 Page 242 CAPITAL PROJECT DESCRIPTION 34371 CIRCULATION SYSTEM STREET PROJECTS - CANNON ROAD WIDENING FROM I-5 TO PASEO DEL NORTE PROJECT NO. PROJECT NAME PROJECT LOCATION MAP:PROJECT LOCATION: Cannon Road from Interstate 5 northbound ramps to Paseo del Norte. PROJECT DESCRIPTION: The addition of one westbound traffic lane. Construction will include grading, paving, and streetlights as required. Work will also include construction of a temporary A.C. curb along the north right-of-way line, and installation of median landscaping and irrigation. PROJECT NEED: Required to meet Growth Management Standards. FINANCING: Purpose Estimated Cost Funding Source Design/Construction $210,725 TIP Total Cost = $210,725 CANNWIDE.doc Page 243 • 1 II II II •• I • 19 II f 1 11 11 II I \ I 1 I I I i i i i i l I i i I i i i i i i i I i i I CAPITAL PROJECT DESCRIPTION i i I i i i I i i CIRCULATION SYSTEM STREET PROJECTS - CARLSBAD BOULEVARD AT BREAKWATER ROAD - LEFT TURN LANE PROJECT NAME 39471 PROJECT NO. PROJECT LOCATION MAP: PROJECT SITE PROJECT LOCATION: Northbound Carlsbad Boulevard at Breakwater Road PROJECT DESCRIPTION: Installation of left turn lane on northbound Carlsbad Boulevard including the required roadway widening, median removal, drainage structures, traffic signal modifications, and signing and striping. PROJECT NEED: Access to the South Carlsbad State Beach campground facility is restricted to southbound traffic only. Vehicles approaching on westbound Poinsettia Lane and northbound Carlsbad Boulevard must divert north on Carlsbad Boulevard. The proposed left turn lane will allow these northbound vehicles to u-turn at Breakwater Road and enter the campground from southbound Carlsbad Boulevard. FINANCING: Purpose Total Cost = Estimated Cost Funding Source $155,000 SCCRDA Uturncbad Page 244 CAPITAL PROJECT DESCRIPTION CIRCULATION SYSTEM STREET PROJECTS - CARLSBAD BOULEVARD ENCINAS CREEK BRIDGE REPLACEMENT PROJECT NAME 39191 PROJECT NO. PROJECT LOCATION MAP: PROJECT PROJECT LOCATION: Southbound lanes of Carlsbad Boulevard south of Palomar Airport Road and north of the South Carlsbad State Beach campgrounds. PROJECT DESCRIPTION: Complete replacement of the existing bridge structure for southbound lanes of Carlsbad Boulevard originally constructed in 1913. The budget for this project includes staff time to pursue federal grants for funding of the project. PROJECT NEED: Carlsbad Boulevard is a major north/south transportation roadway in north county. The bridge structure does not meet seismic standards and is close to exceeding its expected service life. Reinforcing steel is exposed and corroding and Caltrans has recommended that the bridge be replaced. FINANCING: Purpose Studies & Reports Environmental Design Construction Construction Total Cost = Estimated Cost Funding Source $50,000 $125,000 $80,000 $196,000 $1,804,000 $2,255,000 SCCRDA SCCRDA SCCRDA SCCRDA Federal Grant ECbridge • • I Page 245 f I II i 1 II i i i i i i i i i t i i i c i i l i i r i i i f i i i CAPITAL PROJECT DESCRIPTION i i i i i I i i i 34441 CIRCULATION SYSTEM STREET PROJECTS - CARLSBAD BOULEVARD MEDIAN TAMARACK AVENUE TO PINE AVENUE PROJECT NAME PROJECT NO. PROJECT LOCATION MAP: PACIFIC PROJECT LOCATION: Carlsbad Boulevard from Tamarack Avenue to Pine Avenue. PROJECT DESCRIPTION: Construct raised, landscaped median. Work includes concrete curb, landscaping, irrigation and colored, stamped concrete. PROJECT NEED: The median is needed to bring this section of Carlsbad Boulevard up to City Standards for a major arterial. FINANCING: Purpose Estimated Cost Funding Source Design/Construction $1,237,177 PFF Total Cost = $1,237,177 CBMEDIAN Page 246 CAPITAL PROJECT DESCRIPTION 38541 CIRCULATION SYSTEM STREET PROJECTS - CARLSBAD BOULEVARD PEDESTRIAN ACCESS STUDY PROJECT NO. PROJECT NAME PROJECT LOCATION MAP:PROJECT LOCATION: Carlsbad Boulevard from north city limits to State Street. PROJECT DESCRIPTION: The project involves the preparation of a feasibility study reviewing pedestrian/bicycle/vehicle access and safety issues along Carlsbad Boulevard adjacent to the Buena Vista Lagoon and identification of potential safety improvements. The report will also review the scope of the environmental and operational impacts on the corridor and development of a planning level cost estimate of the various options identified in the study. PROJECT NEED: This project is needed to improve the safety for pedestrians and bicyclists traveling between Carlsbad and Oceanside along Carlsbad Boulevard. FINANCING: Purpose Study/Report Total Cost = Estimated Cost Funding Source $105,000 GCC $105,000 Cbadnth Page 247 • • ii ii ii ii ii ii ii ii » • • a • i 11 • « i • fi 11 ii • i i i i i f i i a i i i i i r i ! f i i I I i i I i CAPITAL PROJECT DESCRIPTION i i i i i i ! i i i i 36171 CIRCULATION SYSTEM STREET PROJECTS - CARLSBAD BOULEVARD REALIGNMENT - PHASE 1 PROJECT NAME PROJECT NO. PROJECT LOCATION MAP: PROJECT PACIFIC BATIQUITOS LAGOON PROJECT LOCATION: Along Carlsbad Boulevard from approximately 1200 feet south of Poinsettia Lane to approximately 1200 feet north of Poinsettia Lane. PROJECT DESCRIPTION: Reconstruction of Carlsbad Boulevard to conform with current City Standards for a major arterial roadway. The project also includes realignment of the roadway to the most easterly location possible within the existing right-of-way limits. Phase I of the project occurs between Poinsettia Lane and Island Way. Construction will occur concurrent with adjacent development pursuant to a reimbursement agreement. PROJECT NEED: The project will maximize the use of the existing right-of-way along Carlsbad Boulevard. This will allow for possible expansion of the State Park facilities including additional beach parking spaces. The imminent development of the adjacent Poinsettia Properties project creates an opportunity to initiate the first phase of the realignment project. Initial funding for the project will provide for the preparation of preliminary engineering plans and environmental studies to select an alignment and develop preliminary cost estimates for the eventual project. FINANCING: Purpose Reimbursement Total Cost = Estimated Cost $1,830,000 $1,830,000 Funding Source Gas Tax Cbadreal2 Page 248 CAPITAL PROJECT DESCRIPTION CIRCULATION SYSTEM STREET PROJECTS - CARLSBAD BOULEVARD BRIDGE RETROFIT OVER SAN DIEGO NORTHERN RAILROAD PROJECT NAME 35571 PROJECT NO. PROJECT LOCATION MAP: PKOJhCI PROJECT LOCATION: On Carlsbad Boulevard 500' southerly of its intersection with State Street. PROJECT DESCRIPTION: The project consists of removing the existing 72 year old two-lane bridge and constructing a new four-lane bridge with bicycle lanes and sidewalks over the San Diego Northern Railroad. PROJECT NEED: Caltrans has determined that the bridge over the railroad is vulnerable to severe damage during the design earthquake. Caltrans and the Federal Highways Administration will fund a seismic retrofit of the bridge. Given the age and conditions of the bridge, Caltrans has agreed to apply the retrofit funds towards the construction of a replacement bridge. Widening of the bridge is necessary to bring this section of Carlsbad Boulevard into conformance with City Standards and to assure compliance with Growth Management Standards at buildout. FINANCING: Purpose Design Construction Estimated Cost Funding Source $500,000 $600,000 TransNet/Local* TransNet/Local* Total Cost = $1,100,000 * Funds totaling approximately $800,000 to be reimbursed from State Grant. RRbridge Page 249 • i tie ! I i I I l I I I i t i i i r i i i i i i i t i f i i i t i i i CAPITAL PROJECT DESCRIPTION lift! NONE CIRCULATION SYSTEM STREET PROJECTS - CARLSBAD BOULEVARD WIDENING - PROJECT NO. CANNON ROAD TO MANZANO DRIVE PROJECT NAME PROJECT LOCATION MAP:PROJECT LOCATION: Carlsbad Boulevard from Manzano Drive to Cannon Road. PROJECT DESCRIPTION: Widen Carlsbad Boulevard from two lanes to four lanes with a center raised median (major arterial). Construct pavement, curb and gutter, stamped concrete and landscaping. A planning study was initiated in 1992 to determine alignment alternatives and investigate property access problems. PROJECT NEED: Required to meet Growth Management Standards and the Circulation Element of the General Plan. FINANCING: Purpose Estimated Cost Funding Source Design/Construction $2,000,000 TIP Total Cost = $2,000,000 CBADWIDE Page 250 CAPITAL PROJECT DESCRIPTION NONE CIRCULATION SYSTEM STREET PROJECTS - CARLSBAD VILLAGE DRIVE WIDENING PROJECT NO. PROJECT NAME PROJECT LOCATION MAP:PROJECT LOCATION: On Carlsbad Village Drive from 200 feet east of Pontiac Drive to 200 feet east of Victoria Street. PROJECT DESCRIPTION: Widen Carlsbad Village Drive to secondary arterial standards; street is currently only half-width. Construct curb & gutter, sidewalk, streetlights, median curb, base and asphalt pavement. The project design may include standard modifications consistent with local environmental and topographical constraints of the project site. PROJECT NEED: Required to meet Growth Management Standards and the Circulation Element of the General Plan. FINANCING: Purpose Estimated Cost Funding Source Design/Construction $1,260,000 TIP Total Cost = $1,260,000 CVDWIDEN Page 251 • 1 11 II II II II I I I j I , I , i I I I I i I ! ! } i 1 I I E I I 1 f i I CAPITAL PROJECT DESCRIPTION \ i i i l i t i i i i 36362 CIRCULATION SYSTEM STREET PROJECTS - COLLEGE BOULEVARD REACH A AND CANNON ROAD REACH 4A PROJECT NAME PROJECT NO. PROJECT LOCATION MAP: PROJECT r PROJECT LOCATION: College Boulevard east of ECR from the existing College Boulevard terminus at Badger Lane to Cannon Road and Cannon Road from College Boulevard to approximately 1,200 foot east. PROJECT DESCRIPTION: Construction of the core improvements to College Boulevard from Badger Lane to Cannon Road and Cannon Road from College Boulevard to approximately 1,200 feet east of the College/Cannon intersection. The core improvements include full-width grading, two 18-foot paved travel lanes (one on each side of a raised unimproved median), median curbs, transition to full improvements at the intersection of College Boulevard and Cannon Road, drainage improvements to protect the road fill, a bridge structure across Sunny Creek, erosion control, environmental mitigation and Master Drainage Plan flood retention Basin BJ. The Basin BJ improvements include relocation of the existing private RV storage, maintenance facilities and community garden owned by the Rancho Carlsbad Mobile Home Park residents which currently occupy the proposed basin site. PROJECT NEED: The project is needed to comply with the City's Growth Management Plan and to complete the Circulation Element. FINANCING: Purpose Environmental Construction Total Cost = Estimated Cost $220,000 $1,493,000 $1,713,000 Funding Source Other (Developer) Other (Developer) CollegeA Page 252 CAPITAL PROJECT DESCRIPTION 38791 CIRCULATION SYSTEM STREET PROJECTS - COLLEGE BOULEVARD/CANNON ROAD REACH 3 ASSESSMENT DISTRICT PROJECT NO. PROJECT NAME PROJECT LOCATION MAP: LAKE CALAVERA PROJECT LOCATION: Along the extension of College Boulevard from Cannon Road to Carlsbad Village Drive and along the extension of Cannon Road from El Camino Real to College Boulevard. PROJECT DESCRIPTION: Formation of a financing district for the purpose of financing the construction of the above described sections of College Boulevard and Cannon Road. The improvements within the project jnclude full width grading of the College and Cannon roadways to major arterial standards, construction of the center two lanes separated by a raised unimproved median, installation of needed drainage improvements to protect the roadbed, and fulj width improvements of the arterial intersections with El Camino Real. The outside traffic lanes, fronting improvements and median landscaping/hardscaping will be the obligation of adjacent developing property owners. PROJECT NEED: The project is required to complete the Circulation Element of the General Plan and to comply with the Growth Management Standard for circulation facilities. Financing for the project is required prior to any further development within Zones 7 and 14. Construction of the project may occur in phases consistent with the requirements of the various individual zone plans. FINANCING: Purpose Preliminary Studies/ Environmental Total Cost = Estimated Cost $425,000 $425,000 Funding Source Assessment District *Excludes District design and construction costs. B&TD 4 Page 253 i i i i f i t i t i i I i i i i i I i I i ! } f i I s c } I I i i i i f i i i I i i i I i CAPITAL PROJECT DESCRIPTION NONE CIRCULATION SYSTEM STREET PROJECTS - EL CAMINO REAL AND CARLSBAD VILLAGE DRIVE PROJECT NO. PROJECT NAME PROJECT LOCATION MAP: ECRCVDR CARLSBAD VILLAGE DR. PROJECT LOCATION: At the intersection of El Camino Real and Carlsbad Village Drive. PROJECT DESCRIPTION: Construct northbound and southbound dual left-turn lanes on El Camino Real. PROJECT NEED: Required to meet Growth Management Standards. FINANCING: Purpose Estimated Cost Funding Source Construction $320,000 TIP Total Cost = $320,000 Page 254 CAPITAL PROJECT DESCRIPTION 36071 CIRCULATION SYSTEM STREET PROJECTS - EL CAMINO REAL AND FARADAY AVENUE PROJECT NAME PROJECT NO. PROJECT LOCATION MAP: I I AVE. TT 25 ECRFARAD PROJECT LOCATION: The intersection of El Camino Real and Faraday Avenue. PROJECT DESCRIPTION: Intersection improvements which include adding three exclusive right turns (southbound, eastbound and westbound). Construct curb and gutter, asphalt pavement and sidewalk. Additional right-of-way will be required. PROJECT NEED: Required to meet Growth Management Standards. FINANCING: Purpose Admin/Inspection Design Construction Total Cost = Estimated Cost Funding Source $67,000 $33,000 $781,000 $881,000 TIF TIF TIF Page 255 i i i i I i i i iiiiiififififiitiiii CAPITAL PROJECT DESCRIPTION i i f i i i i NONE CIRCULATION SYSTEM STREET PROJECTS - EL CAMINO REAL AT AVIARA PARKWAY/ALGA ROAD PROJECT NO. PROJECT NAME PROJECT LOCATION MAP:PROJECT LOCATION: On El Camino Real at Aviara Parkway/Alga Road. PROJECT DESCRIPTION: Construction of median improvements and lane striping immediately south of Aviara Parkway/Alga Road to accommodate dual northbound to westbound turn lanes. May include modification to the existing traffic signal standards. PROJECT NEED: Required to comply with Growth Management Standards. FINANCING: Purpose Estimated Cost Funding Source Design/Construction $250,000 TIP Total Cost = $250,000 ECRAVIAR Page 256 CAPITAL PROJECT DESCRIPTION CIRCULATION SYSTEM STREET PROJECTS - EL CAMINO REAL MEDIANS PROJECT NAME 39091 & 36431 PROJECT NO. PROJECT LOCATION MAP:PROJECT LOCATION: At various locations along El Camino Real between the north and south City boundaries. PROJECT DESCRIPTION: Construct raised, landscaped medians at various places where no developer will be obligated to do so as a condition of a private development. Work includes median curb, stamped concrete paving, irrigation and landscaping. NOTE: Project funds may be used to reimburse developer for construction of median improvements in excess of those improvements required of the development. Currently, $100,000 is budgeted to reimburse the Evans Point developer for median improvements constructed adjacent to the Rancho Carlsbad Mobile Home Park. PROJECT NEED: Raised landscaped medians are required on prime arterials for vehicular safety and to meet City standards. FINANCING: Purpose Construction Total Cost = Estimated Cost Funding Source $1,850,000 PFF $1,850,000 ECRMDIAN.doc Page 257 III! i I I I I I i i i i i i i f i i \ i i i i i I i i CAPITAL PROJECT DESCRIPTION i i i i i i i i i i i i 39081 CIRCULATION SYSTEM STREET PROJECTS - EL CAMINO REAL WIDENING - RANCHO CARLSBAD DRIVE TO SUNNYCREEK ROAD PROJECT NAME PROJECT NO. PROJECT LOCATION MAP: PROJECT SITE PROJECT LOCATION: East side of El Camino Real from Rancho Carlsbad Drive to Sunnycreek Road. PROJECT DESCRIPTION: Widening approximately 1,500 linear feet of roadway including construction of curb, gutter, sidewalks, pavement, median, roadway rehabilitation, signal modifications on El Camino Real, and modifications to the golf course entrance and the 10th hole of the golf course. PROJECT NEED: El Camino Real is identified in the SANDAG Congestion Management Plan (CMP) as a failing road. Adjacent property is fully developed. Widening this section of roadway will contribute to the City's CMP deficiency plan as mandated by the State. FINANCING: Purpose Design & Environmental Right-of-Way Construction Admin/lnsp Total Cost = Estimated Cost $200,000 $500,000 $950,000 $150,000 $1,800,000 Funding Source *TransNet Local *TransNet Local TransNet Local 'Funding source may change if adjacent property develops or assessment districts are formed. ECFLRCD Page 258 CAPITAL PROJECT DESCRIPTION CIRCULATION SYSTEM STREET PROJECTS - EL CAMINO REAL WIDENING LA COSTA AVENUE TO ARENAL ROAD PROJECT NAME NONE PROJECT NO. PROJECT LOCATION MAP: ECRLACOS • I I • PROJECT LOCATION: On the west side of El Camino Real from La Costa Avenue to Arenal Road. PROJECT DESCRIPTION: Add the southbound lane for a length of approximately 3,400 feet to widen the street to full prime arterial standards. Construct curb & gutter, sidewalk, base, and asphalt pavement and streetlights. PROJECT NEED: Required to comply with Growth Management Standards. FINANCING: Purpose Estimated Cost Funding Source Design/Construction $450,000 TIP Total Cost = $450,000 Page 259 I I i i i i i i i i i i t i I i t i I i I i l i i i i i i i i i i i I i i ; i i CAPITAL PROJECT DESCRIPTION NONE CIRCULATION SYSTEM STREET PROJECTS - EL CAMINO REAL WIDENING - LISA STREET TO CRESTVIEW DRIVE PROJECT NAME PROJECT NO. PROJECT LOCATION MAP: PROJECT SITE PROJECT LOCATION: West side of El Camino Real from south of Lisa Street to Crestview Drive. PROJECT DESCRIPTION: Widening approximately 1,200 linear feet of roadway including construction of curb, gutter, sidewalks, pavement, median, and roadway rehabilitation on El Camino Real. PROJECT NEED: El Camino Real is identified in the SANDAG Congestion Management Plan (CMP) as a failing road. Adjacent property is fully developed. Widening this section of roadway will contribute to the City's CMP deficiency plan as mandated by the State. FINANCING: Purpose Design & Environmental Right-of-Way Construction Total Cost = Estimated Cost $82,000 $250,000 $627,000 $959,000 Funding Source TransNet Local TransNet Local TransNet Local •Funding source may change if adjacent property develops or assessment districts are formed. ECR_Lisa Page 260 CAPITAL PROJECT DESCRIPTION CIRCULATION SYSTEM STREET PROJECTS - EL CAMINO REAL WIDENING NORTH OF COUGAR DRIVE PROJECT NAME NONE PROJECT NO. PROJECT LOCATION MAP: ROJECT PROJECT LOCATION: East side of El Camino Real north of Cougar Drive. PROJECT DESCRIPTION: Widening approximately 250 linear feet of roadway including construction of curb, gutter, sidewalks, pavement, median, and roadway rehabilitation on El Camino Real. PROJECT NEED: El Camino Real is identified in the SANDAG Congestion Management Plan (CMP) as a failing road. Adjacent property is fully developed. Widening this section of roadway will contribute to the City's CMP deficiency plan as mandated by the State. FINANCING: Purpose Design & Environmental Right-of-Way Construction Total Cost = Estimated Cost $30,000 $60,000 $403,000 $493,000 Funding Source TransNet Local TransNet Local TransNet Local *Funding source may change if adjacent property develops or assessment districts are formed. Elcamino Page 261 • • • a i i i i i i i I i I I 1 i I i I i i i I i i i I i i \ i t CAPITAL PROJECT DESCRIPTION CIRCULATION SYSTEM STREET PROJECTS - EL CAMINO REAL WIDENING TAMARACK AVENUE TO CHESTNUT AVENUE PROJECT NAME 39571 & 39291 PROJECT NO. PROJECT LOCATION MAP: PROJECT PROJECT LOCATION: Along El Camino Real from Tamarack Avenue to Chestnut Avenue. PROJECT DESCRIPTION: Add the outside lane to widen street to full prime arterial standards. Widen west side approximately 1,200 feet in length and east side approximately 600 feet in length. Construct curb & gutter, sidewalk, base, and asphalt pavement and streetlights. PROJECT NEED: To complete widening to prime arterial standards where no developers are likely to develop and to improve the road capacity. FINANCING: Purpose Estimated Cost Funding Source Design/Construction $1,904,823 TIP Total Cost = $1,904,823 ECRWIDE2.doc Page 262 CAPITAL PROJECT DESCRIPTION CIRCULATION SYSTEM STREET PROJECTS - FARADAY AVENUE/MELROSE DRIVE EXTENSIONS PROJECT NAME 36222 PROJECT NO. PROJECT LOCATION MAP:PROJECT LOCATION: Along the extension of Melrose Drive from Palomar Airport Road to the Carlsbad/Vista city limit and along the extension of Faraday Avenue from Orion Way to Melrose Drive in Vista. PROJECT DESCRIPTION: Construction of two lanes of Faraday Avenue approximately 1.3 miles from its current terminus at Orion Way easterly to Melrose Drive in the City of Vista and the construction of four lanes of Melrose Drive approximately 0.3 miles from Palomar Airport Road to its current terminus at the CarlsbadA/ista city boundary. The project would include the reconstruction of a portion of existing Melrose Drive in the City of Vista and the construction of a bridge over the Agua Hedionda Creek along Faraday Avenue. PROJECT NEED: The project is required to complete the Circulation Element of the General Plan and to comply with the Growth Management Standard. The project will divert significant amounts of traffic from existing Palomar Airport Road by providing a second east/west arterial linkage from Melrose Drive to Interstate 5 through the core of the Carlsbad and Vista industrial centers. FINANCING: Purpose Estimated Cost Funding Source Preliminary Design Design/Construction Design Design Total Cost +++= $1,021,826 $3,000,000 $97,210 $110,200 $4,229,236 H-++ Other (Developer) Other Water Connection Sewer Replacement ++ Completed - Project Nos. 36223, 36224, 36225 +++Excludes construction costs by developer CEQA Status: EIR pending certification. Far melr I I I i 1 \ i i i I f I 1 ! I ! I! i I ! I i I i I i i ! CAPITAL PROJECT DESCRIPTION I i i i I i I i 35931 CIRCULATION SYSTEM STREET PROJECTS - FARADAY AVENUE MITIGATION - SOUTH OF CANNON ROAD PROJECT NO. PROJECT NAME PROJECT LOCATION MAP:PROJECT LOCATION: North side of Faraday Avenue, east of Cannon Road. PROJECT DESCRIPTION: Monitoring and maintenance of a coastal sage scrub mitigation site. PROJECT NEED: Required by Resource Agency permits to construct Faraday Avenue. FINANCING: Purpose Estimated Cost Funding Source Mitigation Maintenance $5,500,000* CFD#1 Total Cost = $5,500,000* * Construction of Faraday Avenue was completed in 2003. A balance of $63,661 remains to cover costs associated with maintenance of environmental mitigation requirements. FARADAY.doc Page 264 CAPITAL PROJECT DESCRIPTION CIRCULATION SYSTEM FREEWAY INTERCHANGE PROJECTS - INTERSTATE 5 AND LA COSTA AVENUE AUXILIARY LANES PROJECT NAME PROJECT NO. PROJECT LOCATION MAP:PROJECT LOCATION: At the intersection of Interstate 5 and La Costa Avenue. PROJECT DESCRIPTION: The addition of auxiliary traffic lanes on Interstate 5 to be installed at the future direction of Caltrans. PROJECT NEED: Required to meet Growth Management Standards. FINANCING: Purpose Estimated Cost Funding Source Design/Construction $1,500,000 CFD #1 Total Cost = $1,500,000 l-5LACOS.doc Page 265 i i i i i i i i f i i i f i ! i f i f i f i I i f i i i t i i i CAPITAL PROJECT DESCRIPTION i i I f i i NONE CIRCULATION SYSTEM STREET PROJECTS - MELROSE DRIVE AND ALGA ROAD PROJECT NO. PROJECT NAME PROJECT LOCATION MAP: Vi TT oo O ALGA ROAD PROJECT LOCATION: At the intersection of Melrose Drive and Alga Road. PROJECT DESCRIPTION: Construct dual left-turn lanes on all approaches to the intersections- northbound, southbound, eastbound and westbound. PROJECT NEED: Required to meet Growth Management Standards. FINANCING: Purpose Estimated Cost Funding Source Design/Construction $480,000 TIP Total Cost = $480,000 MELROALG Page 266 CAPITAL PROJECT DESCRIPTION CIRCULATION SYSTEM STREETS PROJECTS - OLIVENHAIN ROAD WIDENING MITIGATION MONITORING PROJECT NAME 38521 PROJECT NO. PROJECT LOCATION MAP: OLVNROAD II I PROJECT LOCATION: Olivenhain Road from El Camino Real to approximately 700 feet west of Armagosa Drive. PROJECT DESCRIPTION: Completion of the five-year monitoring of the environmental mitigation measures installed concurrent with the realignment, reconstruction and widening of Olivenhain Road to prime arterial standards. PROJECT NEED: Required pursuant to environmental permits. FINANCING: Purpose Estimated Cost Funding Source Mitigation Monitoring $15,000 CFD #2 Total Cost = $15,000 Page 267 i !f i i i i i t i i i I i f ! f ! f i f i f i i i i i CAPITAL PROJECT DESCRIPTION i § i i t i i NONE i i CIRCULATION SYSTEM STREET PROJECTS - PALOMAR AIRPORT ROAD AND COLLEGE BOULEVARD PROJECT NO. PROJECT NAME PROJECT LOCATION MAP: PALOMAR AIRPORT ROAD PROJECT LOCATION: At the intersection of the Palomar Airport Road and College Boulevard. PROJECT DESCRIPTION: Construct dual left-turn lane on College Boulevard southbound to eastbound. Project work includes reconstruction of median improvements, striping and signal modifications. Additional right-of-way will be required. PROJECT NEED: Required to meet Growth Management Standards. FINANCING: Purpose Estimated Cost Funding Source Design/Construction $160,000 TIP Total Cost = $160,000 PARCOLLE Page 268 CAPITAL PROJECT DESCRIPTION 39481 CIRCULATION SYSTEM STREET PROJECTS - PALOMAR AIRPORT ROAD WIDENING AND BRIDGE RECONSTRUCTION PROJECT NAME PROJECT NO. PROJECT LOCATION MAP: PROJECT RD. PROJECT LOCATION: On Palomar Airport Road between Carlsbad Boulevard and I-5 over the San Diego Northern Railway. PROJECT DESCRIPTION: Reconstruct old interchange and connect Palomar Airport Road to Carlsbad Boulevard with a standard signalized tee intersection. Construct four lanes of asphalt pavement on Palomar Airport Road (600 feet) and Carlsbad Boulevard (1,000 feet) including curb and gutter, medians, sidewalk, streetlights, traffic signal and new bridge over railroad. PROJECT NEED: Required to meet Growth Management Standards. Project will improve the capacity of the intersection and free two parcels of land which the City can lease or develop. FINANCING: Purpose Environmental Design Inspection Construction Total Cost = Estimated Cost Funding Source $250,000 $500,000 $250,000 $10,000,000 $11,000,000 Unfunded SCCRDA Unfunded Unfunded PARBRIDG.doc Page 269 I 1 i i i i i i i i i i i i i i ? I s i I I i I i i i 1 i t i i i CAPITAL PROJECT DESCRIPTION CIRCULATION SYSTEM STREET PROJECTS - PALOMAR AIRPORT ROAD WIDENING AT PASEO DEL NORTE PROJECT NAME i I i I i i 38111 PROJECT NO. PROJECT LOCATION MAP:PROJECT LOCATION: On the north side of Palomar Airport Road at the intersection with Paseo Del Norte. PROJECT DESCRIPTION: Widen the easterly approach of Palomar Airport Road (PAR) at the intersection of Paseo Del Norte (PDN) to accommodate an additional through lane. The added lane would be designed to align with the existing "right-turn only" lane onto northbound Interstate 5. The existing westbound to northbound right-turn lane from PAR to PDN would be relocated slightly north of its current location to eliminate the partial offset with the existing "right-turn only1 lane on the west side of the intersection. PROJECT NEED: Required to meet the Growth Management Circulation Standard. The current intersection is operating at an unacceptable level of service due to a backup of traffic attempting to go northbound along Interstate 5. This project will allow for smoother transition of the westbound to northbound traffic into the two right-turn lanes to northbound 1-5 from traffic proceeding westbound along PAR through the PDN intersection. FINANCING: Purpose Admin/Inspection Construction Total Cost = Estimated Cost $55,000 $480,000 $525,000 Funding Source TIP TIP Par_pdn Page 270 CAPITAL PROJECT DESCRIPTION CIRCULATION SYSTEM STREET PROJECTS - PAVEMENT MANAGEMENT PROGRAM PROJECT NAME 36671, 36791 & 38681 PROJECT NO. PROJECT LOCATION MAP: THROUGHOUT THE CITY PROJECT LOCATION: Throughout the City. PROJECT DESCRIPTION: The Pavement Management Program is an ongoing annual program designed to extend the service life of city streets and to maintain a smooth and safe driving surface for vehicles. The City utilizes a pavement management database program to determine pavement management needs for the purpose of establishing which streets are to be oil sealed, chipped sealed, overlaid or reconstructed. On a periodic basis the condition of the roads are field surveyed and the pavement management database is updated to reflect current conditions. Each year, specific pavement management projects are defined and funding is transferred into a pavement management project account. PROJECT NEED: City streets require annual maintenance to maintain a safe and smooth driving surface and to extend the useful service life of the streets. FINANCING: Purpose Pavement Management Pavement Management Pavement Management Pavement Management Total Cost = Estimated Cost Funding Source $24,039,341 $39,621,088 $1,089,065 $7,500,000 $72,249,494 TransNet/Local* Gas Tax State Grant IRF * Includes $49,993 balance forward from Project No. 38551. PVMTMGMT.doc Page 271 I 1 ii ii i i i i li ii t i i; ii 11 ii ii ii ii CAPITAL PROJECT DESCRIPTION i i ii ii i i i i 36892 CIRCULATION SYSTEM STREET PROJECTS - POINSETTIA LANE EAST OF EL CAMINO REAL PROJECT NO FINANCING PROGRAM PROJECT NAME PROJECT LOCATION MAP:PROJECT LOCATION: Along the future alignment of Poinsettia Lane from El Camino Real east to El Fuerte Street. PROJECT DESCRIPTION: Formation of a financing district/program to guarantee the construction of Poinsettia Lane to full major arterial standards west of El Camino Real. The project, in conjunction with the Poinsettia Lane improvements proposed west of El Camino Real, will complete another east/west arterial linkage from Melrose Drive to Interstate 5. PROJECT NEED: Required pursuant to the City Circulation Element and Growth Management Program. The recent failure of the PAR/ECR intersection to meet the Growth Management circulation standard makes it imperative to construct additional east/west arterial connectors to reduce traffic loads along the PAR corridor. FINANCING: Purpose Preliminary Engineering Total Cost = Estimated Cost $72,432 $72,432 Funding Source ASMT DIST Poineast Page 272 CAPITAL PROJECT DESCRIPTION CIRCULATION SYSTEM STREET PROJECTS - POINSETTIA LANE WIDENING (PASEO DEL NORTE TO BATIQUITOS LANE) PROJECT NAME NONE PROJECT NO. PROJECT LOCATION MAP:PROJECT LOCATION: From Paseo Del Node to Batiquitos Lane. PROJECT DESCRIPTION: Widen Poinsettia Lane from Paseo Del Norte to Batiquitos Lane to six lanes by adding one lane in each direction. Construct curb and gutter, base, asphalt pavement and sidewalk. Right-of-way is required. PROJECT NEED: Required to meet Growth Management Standards. FINANCING: Purpose Estimated Cost Funding Source Design/Construction $1,870,000 TIF Total Cost = $1,870,000 POINWIDE Page 273 • 1 m i • • 11 11 ii ii it i • 111!liiiiiiiiitiiiiiiiiiiili CAPITAL PROJECT DESCRIPTION 1 i I i i i i i f i CIRCULATION SYSTEM STREETS PROJECTS - RANCHO SANTA FE ROAD AND OLIVENHAIN ROAD IMPROVEMENTS PROJECT NAME 38601 PROJECT NO. PROJECT LOCATION MAP: PROJECT PROJECT LOCATION: Intersection of Rancho Santa Fe Road and Olivenhain Road. PROJECT DESCRIPTION: Complete full intersection improvements to the Rancho Santa Fe Road and Olivenhain Road intersection to General Plan standards. Extend street improvements on Rancho Santa Fe Road between the Olivenhain Municipal Water District access to a distance approximately 200 feet east of the intersection with Olivenhain Road. Extend street improvements on Olivenhain Road from the intersection with Olivenhain Road west to meet existing full-width improvements within the City of Encinitas. The project would involve right-of-way acquisition, grading, storm drains, removal of existing improvements and installation of surface improvements, street lights, and coordination with agencies for utility realignment PROJECT NEED: These improvements are required in order to keep intersection capacity at or below the thresholds dictated by the Growth Management Standards and per the General Plan for build-out. Full intersection improvements will improve vehicular circulation and increase safety to serve the public and nearby developments to the south that will impact the intersection once full occupancy is reached. The City of Encinitas and Olivenhain Municipal Water District are in support of the project and will reimburse the City of Carlsbad for their share of the improvements. FINANCING: Purpose Estimated Cost Funding Source Design/Construction $3,800,000 CFD #2 Total Cost = $3,800,000 Olivenrsf Page 274 CAPITAL PROJECT DESCRIPTION 31906 CIRCULATION SYSTEM STREET PROJECTS - RANCHO SANTA FE ROAD NORTH PHASE I PROJECT NO PROJECT NAME PROJECT LOCATION MAP: PROJECT PROJECT LOCATION: Along the future alignment of Rancho Santa Fe Road from La Costa Avenue to approximately 1,800 feet south of Questhaven Road. PROJECT DESCRIPTION: Construction of 4 lanes of Rancho Santa Fe Road to prime arterial standards including full width grading. Project involves the realignment of Rancho Santa Fe Road easterly of its present alignment to a location approximately in the area of the current truck bypass route. PROJECT NEED: Required to meet Growth Management Standards. FINANCING: Purpose Estimated Cost Funding Source Design/Construction $26,284,656 CFD #2 Total Cost = $26,284,656 RSFN_PHI.doc Page 275 mm mm i m mm i i i i i i • • • i i i i i 1 i i i i I i i i i ii i ! i i i i i I ; i i i i i i i i i i I i CAPITAL PROJECT DESCRIPTION 39231 & 39071 CIRCULATION SYSTEM STREET PROJECTS - RANCHO SANTA FE ROAD NORTH PHASE II PROJECT NO. PROJECT NAME PROJECT LOCATION MAP: PROJECT PROJECT LOCATION: Along Rancho Santa Fe Road from approximately 1,800 feet south of San Elijo Road to Melrose Drive. PROJECT DESCRIPTION: Realignment and widening of Rancho Santa Fe Road and construction of new bridge structures over the San Marcos Creek. PROJECT NEED: Required to meet Growth Management Standards. FINANCING: Estimated Cost Funding SourcePurpose Design/Environmental Bridge Pipeline Replacement Total Cost = $3,100,000 $15,319,000 $773,000 $19,192,000 CFD#2 CFD#2 Water Replacement RSFNPHII.doc Page 276 CAPITAL PROJECT DESCRIPTION 38801 CIRCULATION SYSTEM STREET PROJECTS - RANCHO SANTA FE ROAD SOUTH (TO ENCINITAS) PROJECT NO. PROJECT NAME PROJECT LOCATION MAP: PROJECT PROJECT LOCATION: Along Rancho Santa Fe Road south from Olivenhain Road to Encinitas. PROJECT DESCRIPTION: Construction of Rancho Santa Fe Road to modified secondary arterial road standards including full width grading and necessary drainage facilities. PROJECT NEED: Required to meet Growth Management Standards for Zone 11 development. FINANCING: Purpose Estimated Cost Funding Source Design/Construction $1,350,000 CFD #2 Total Cost = $1,350,000 RSFSOUTH Page 277 ft 1 I J ft M ft 1 ft 1 II ft iitiiiiiiiiiliiiiiiifiiiiiii CAPITAL PROJECT DESCRIPTION f i i i i i i § i i 38831 & 39531 CIRCULATION SYSTEM STREET PROJECTS - SIDEWALK/STREET CONSTRUCTION PROGRAM PROJECT NO. PROJECT NAME PROJECT LOCATION MAP: N/A PROJECT LOCATION: Various streets throughout the City. PROJECT DESCRIPTION: The Sidewalk/Street Construction Program is an annual program designed to complete missing links of sidewalk throughout the City. In most cases, construction of the sidewalk improvements involve construction of adjacent street improvements to bring them into conformance with City Standards. Each year, several sidewalk/street projects are selected from the City's missing sidewalk priority list for inclusion into that year's sidewalk/street construction project. PROJECT NEED: Required to meet the pedestrian circulation policies of the Circulation Element of the General Plan. FINANCING: Purpose Estimated Cost Funding Source Design/Construction $3,961,081 TIP Total Cost = $3,961,081 SWCONPGM.doc Page 278 CAPITAL PROJECT DESCRIPTION CIRCULATION SYSTEM STREET PROJECTS - TRAFFIC MONITORING PROGRAM PROJECT NAME 39281 PROJECT NO. PROJECT LOCATION MAP: N/A PROJECT LOCATION: Citywide. PROJECT DESCRIPTION: Perform traffic vehicle counts, analyze and report annually on adequacy of circulation system and identify any intersections or links that fail to meet Growth Management Standards. PROJECT NEED: To ensure that the circulation system meets Growth Management Standards. FINANCING: Purpose Estimated Cost Funding Source Field Counts/Reports $1,210,611 TIP Total Cost = $1,210,611 Annual Expenditures are approximately $70,000. TRAFFMON.doc Page 279 ft Ji •i. • ft • a i • • i i I I i i I i t i i i i i I i I i I I 1 i I i l i 1 i i i CAPITAL PROJECT DESCRIPTION l i i i i i i i i i 38951 CIRCULATION SYSTEM STREET PROJECTS - UNDERGROUND UTILITY NO. 17 (ROOSEVELT STREET) PROJECT NAME PROJECT NO. PROJECT LOCATION MAP:PROJECT LOCATION: Roosevelt Street from Carlsbad Village Drive to Magnolia Avenue. PROJECT DESCRIPTION: Place all overhead utilities underground, including electric, telephone, and cable television lines. Work includes trenching, placing conduit and cable, restoring surface, and removal of existing poles and all overhead lines. PROJECT NEED: This project is identified on the City Council's adopted Underground Priority List. FINANCING: Purpose Design/Construction Street Lights Total Cost = Estimated Cost Funding Source $850,000 $509,800 $1,359,800 20A Funds (SDG&E) GCC UUD17.doc Page 280