HomeMy WebLinkAbout; ; 2005 - 2006 Technical Appendix; 2006-07-01INTRODUCTION The purpose of this Technical Appendix is to provide a brief description of the project scope, location and need for those projects approved in the City of Carlsbad 2005-06 Capital Improvement Program (CIP) Budget. Also included at the beginning of each project category is a funding matrix which identifies the proposed funding source(s), funding amounts and timing for each of the approved CIP projects included with the respective category. All projects with any current or future funding are listed. Most of the cost estimates included in this appendix are preliminary as detailed designs have not been completed. All costs are in current dollars, therefore, projects in future years should be anticipated to escalate over time to account for inflation. TABLE OF CONTENTS CIVIC PROJECTS Administrative Facility Projects Funding Matrix for Administrative Facility Projects 1 Civic Center 2 City Administration Training Facility 3 Public Works Center 4 Police and Fire Facility Projects Funding Matrix for Police and Fire Facility Projects 5 Fire Station No. 3 (Relocation) 6 Fire Station No. 5 Storage Building/Restrooms 7 Fire Station No. 6 (Permanent) 8 Police and Fire CAD Implementation 9 Public Safety Training Facility 10 Library Facility Projects Funding Matrix for Library Facility Projects 11 Cole Library Expansion 12 Carlsbad Library Learning Center 13 Miscellaneous Projects Funding Matrix for Miscellaneous Projects 14 Bicycle Master Plan 15 Community Facilities District #1 Administration 16 Coastal Rail Trail 17 Coastal Rail Trail Corridor 18 Opportunistic Sand Program 19 Pedestrian Master Plan 20 Proposition "C" Projects 21 Public Works Inventory and Facilities Management Program 22 Village Public Parking Enhancement Program 23 FACILITY MAINTENANCE PROJECTS Facility Maintenance Projects Funding Matrix for Facility Maintenance Projects 24 Beach Access Repair/Upgrades 25 Chase Field Lighting Improvement 26 Cole Library HVAC Replacement 27 Holiday Park Restroom Improvements 28 Laguna Riviera Park Restroom Replacement 29 Repair/Recoat Guardrail Palomar Airport Bridge at Carlsbad Boulevard 30 Safety Center Building Improvements 31 Safety Center Conference Center Refurbishment 32 Carlsbad Senior Center Courtyard Renovation 33 Stagecoach Park Picnic Shelter 34 Stagecoach Park Synthetic Turf Fields 35 Tot Lot Improvement Projects 36 Various Facility Concrete Repairs 37 PARKS PROJECTS Citvwide Parks Projects Funding Matrix for Citywide Parks Projects 38 Business Park Recreational Facility 39 Carlsbad Municipal Golf Course 40 Lake Calavera Trails Master Plan 41 Senior Center Expansion 1st Floor 42 Senior Center Expansion 2nd Floor 43 Veteran's Memorial Park 44 Northwest Quadrant Parks Projects Funding Matrix for Northwest Quadrant Parks Projects 45 Park Acquisition 46 Pine Avenue Park- Phase 1 47 Pine Avenue Park - Phase II (Community Building) 48 Northeast Quadrant Parks Projects Funding Matrix for Northeast Quadrant Parks Projects 49 Hidden Canyon Park 50 Park Site Acquisition 51 Park Site Development 52 Southwest Quadrant Parks Projects Funding Matrix for Southwest Quadrant Parks Projects 53 Aviara Community Park- Phase 1 54 Aviara Community Park - Phase II (Community Building) 55 Aviara Reimbursement Agreement 56 Poinsettia Community Park - Phase II 57 Southeast Quadrant Parks Projects Funding Matrix for Southeast Parks Projects 58 Alga NortePark- Phase 1 59 Alga Norte Park Phase II (Aquatics Center) 60 Carrillo Ranch Phase III Barn/Theater 61 Carrillo Ranch Erosion Repair 62 Leo Carrillo Park-Phase III 63 DRAINAGE PROJECTS Drainage Projects Funding Matrix for Drainage Projects 64 Agua Hedionda Channel Improvements 65 Aviara Parkway Storm Drain Reimbursement 66 Carlsbad Boulevard Storm Drain Replacement 67 College Boulevard Bridge Facility 68 College Boulevard/Cannon Road (Drainage Basin BJB) 69 College Boulevard/Cannon Road (Calavera Creek Channel and Drainage Basin BJ) 70 Cynthia Lane Storm Drain 71 Faraday/Melrose Drainage Facilities 72 Gabbiano Lane Storm Drain Modification Study 73 Highland Drive Between Pine Avenue and Basswood Avenue 74 Highland Drive Storm Drain 75 La Costa Avenue Storm Drain Replacements 76 Master Drainage Plan Update 77 Miscellaneous Master Drainage Facilities 78 Miscellaneous Road Subdrains 79 Park Drive and Tamarack Avenue Storm Drain 80 Tamarack and El Camino Real Storm Drain and Siltation Basin 81 SEWER PROJECTS Encina Water Pollution Control Facility Projects Funding Matrix for Encina Water Pollution Control Facility Projects 82 Building Improvements 83 Capital Acquisitions Replacement/Rehabilitation 84 Flow Equalization Project 85 Phase IV Expansion Debt Service 86 Phase V Expansion 87 Pump Station Interfaces 88 Staffing / Professional Services & Misc 89 Technology Enhancement 90 Sewer Collection System Projects Funding Matrix for Sewer Collection System Projects 91 Avenida Encinas Gravity Sewer 92 Buena Interceptor Sewer Improvements 93 Buena Vista Lift Station & Pump Addition 94 Buena Vista Lift Station Force Main (VC-4) 95 Carlsbad Trunk Sewer Reaches VCT1 A, VCT1B, VCT1C 96 Forest Gravity Sewer 97 Home Plant Lift Station 98 La Costa Meadows Sewer Extension 99 La Golondrina Sewer Extension 100 North Agua Hedionda Interceptor Rehabilitation - West Segment Cove Drive to Hoover Street 101 North Agua Hedionda Interceptor Rehabilitation - East Segment El Camino Real to Kelly Drive 102 North Agua Hedionda Trunk Sewer Reach NAHT1A 103 North Batiquitos Interceptor Rehabilitation 104 North Batiquitos Sewage Lift Station Modifications 105 Poinsettia Lane Sewer Relocation 106 Poinsettia Sewage Lift Station Odor and Noise Abatement 107 Sewer Lift Station - Miscellaneous Repairs & Upgrades 108 Sewer Line Refurbishment/ Replacement 109 Master Plan / Connection Fee Update 110 Sewer Monitoring Program 111 IV Sewer Collection System Projects (Continued) South Agua Hedionda Lift Station and Force Main 112 Terramar Lift Station Emergency Generator 113 Vista/Carlsbad Interceptor Agua Hedionda Lift Station (VC 12) 114 Vista/Carlsbad Interceptor Sewer Reach VC11B 115 Vista/Carlsbad Interceptor Sewer Reaches VC13 to VC15 116 Vista/Carlsbad Interceptor Sewer Rehabilitation Reaches 1 thru 3 117 WATER PROJECTS Water Distribution System Projects Funding Matrix for Water Distribution System Projects - Sheet 1 118 Funding Matrix for Water Distribution System Projects - Sheet 2 119 "D" Reservoir-Phase 11 120 "D" Reservoir- Black Rail Road Improvements 121 "D" Reservoir Improvements 122 Aviara Parkway 123 Calavera Hills Water Booster Station Standby Generator 124 Cannon Road East of El Camino Real 125 Carlsbad Boulevard South of Avenida Encinas 126 College Boulevard from Cannon Road to Carlsbad Village Drive 127 College Boulevard - Cannon Road to Badger Lane 128 College Boulevard (ECR to Cannon Road) 129 College Boulevard Maerkle Reservoir to Agua Hedionda Creek 130 Crestview Drive Transmission Main 131 Demolition of Water Facilities at Pajama Drive 132 Desalination Groundwater/Seawater Study 133 El Camino Real (Palomar Airport Road South) 134 El Camino Real between College & Jackspar 135 El Camino Real Crossing at Kelly Drive 136 El Camino Real Transmission Main - Lisa Street to Kelly Drive 137 El Camino Real Transmission Main from Faraday Avenue to Cougar Drive 138 El Camino Real / Carlsbad Village Drive Water Pipeline Replacement 139 El Fuerte (North of Loker) 140 El Fuerte (Alga Road to Poinsettia Lane) 141 El Fuerte (Poinsettia Lane to Palomar Airport Road) 142 El Fuerte and Corintia Street 143 Water Distribution System Projects (Continued) Faraday Avenue Extension 144 Foussat Road Well Abandonment 145 Lake Calavera Reservoir Improvements 146 Maerkle Pump Station 147 Maerkle Reservoir Storage (TAP #2) 148 Marron Road (Pressure Regulating Station to Oceanside) 149 Master Plan Update 150 Melrose Drive / Palomar Airport Road to Faraday 151 Miscellaneous Pipeline Replacements 152 Miscellaneous Storage Tank Repairs 153 Miscellaneous Water Reservoir Fencing 154 Oceanside Intertie Upgrade 155 Palomar Airport (North of Owens) 156 Palomar Airport Road / El Camino Real Pump Station 157 Poinsettia Lane (El Camino Real to Skimmer Court) 158 Poinsettia Lane (Skimmer Court to Cassia Road) 159 Poinsettia Lane East of Black Rail Road 160 Pressure Reducing Station - Sycamore Creek 161 Pressure Regulating Station (Cannon Road and College Boulevard) 162 Rancho Carrillo Oversizing/ Extension 163 San Marcos Blvd. Pipeline Replacement Palomar Airport Road West of San Diego County Water Authority (SDCWA) 164 Tanglewood Pressure Reducing Station Replacement 165 TAP Reservoir Exterior Painting 166 Water Operations Water Pump Project 167 Water System Intertie Connection 168 Recycled Water Projects Funding Matrix for Recycled Water Projects 169 Chestnut Avenue Recycled Water Line 170 El Camino Real and Tamarack RW Pump Station 171 I-5 Recycled Water Transmission Line 172 Paseo Del Norte Recycled Pipeline Replacement 173 Pump Station Removal 174 Recycled Water Phase II - Facility 175 Recycled Water Phase II - Flow Equalization 176 Recycled Water Phase II - Mahr Reservoir Improvements 177 Recycled Water Phase II - Pipelines 178 Recycled Water Phase II - Pump Stations 179 vi CIRCULATION SYSTEM PROJECTS Traffic Signal Projects Funding Matrix for Traffic Signal Projects - Sheet 1 180 Alga Road and Cazadero Drive 181 Aviara Parkway (Poinsettia Lane to El Camino Real) 182 Aviara Parkway and Camino De Las Ondas 183 Calle Barcelona and Paseo Avellano 184 Camino De Los Coches and Calle Acervo 185 Camino De Los Coches and La Costa Avenue 186 Camino Vida Roble and Yarrow Drive 187 Cannon Road and Avenida Encinas 188 Cannon Road and College Boulevard 189 Carlsbad Boulevard and Tamarack Avenue Signal Repairs 190 Carlsbad Boulevard and Cherry Avenue 191 Carlsbad Village Drive and Glasgow Drive 192 College Boulevard and Carlsbad Village Drive 193 El Camino Real / Plaza Drive / Marron Road / Hosp Way 194 El Camino Real and Chestnut Avenue Signal Repairs 195 El Camino Real and Poinsettia Lane 196 El Camino Real and Tamarack Avenue Signal Repairs 197 Faraday Avenue and Camino Hills Drive 198 Faraday Avenue and Orion Street 199 Faraday Avenue and Priestly Drive 200 Faraday Avenue and Rutherford Road 201 La Costa Avenue and Esfera Street 202 La Costa Avenue and Levante Street 203 La Costa Avenue and Nueva Castilla Way 204 Melrose Drive and La Costa Avenue 205 Monroe Street and Hosp Way 206 Palomar Airport Road and Melrose Drive 207 Paseo Del Norte and Car Country Drive 208 Poinsettia Lane and Black Rail Road 209 Poinsettia Lane and Brigantine Road 210 Poinsettia Lane and El Fuerte Street 211 VII Traffic Signal Projects (Continued) Poinsettia Lane and Snapdragon Drive 212 Rancho Santa Fe Road and Calle Junipero (Formerly Melrose Drive South) 213 Rancho Santa Fe Road and San Elijo Road (Formerly Questhaven Road) 214 Tamarack Avenue and Pontiac Drive 215 Tamarack Avenue and Valley Street 216 Tamarack Avenue and Garfield Street 217 Video Detection Conversion 218 Street Projects Funding Matrix for Street Projects - Sheet 1 219 Funding Matrix for Street Projects - Sheet 2 220 Avenida Encinas Widening South of Palomar Airport Road 221 B&TD#2 Poinsettia Lane Reach "E" (Cassia Road to Skimmer Court) 222 Bridge and Thoroughfare District No. 2 Poinsettia Lane Reaches A, B, C, F, G & Aviara Parkway Reimbursement 223 B&TD#3 - Cannon Road West Frost Avenue to Faraday Avenue (Reimbursement) 224 Cannon Road Reach 4B - College Boulevard to Oceanside 225 Carlsbad Boulevard at Breakwater Road - Left Turn Lane 226 Carlsbad Boulevard and State Street Pedestrian and Intersection Enhancement Design 227 Carlsbad Boulevard and State Street Intersection Enhancement Design 228 Carlsbad Boulevard Encinas Creek Bridge Replacement 229 Carlsbad Boulevard Median Tamarack Avenue to Pine Avenue 230 Carlsbad Boulevard Bridge Retrofit Over San Diego Northern Railroad 231 Carlsbad Boulevard Widening - Cannon Road to Manzano Drive 232 Carlsbad Village Drive Widening 233 College Boulevard Reach A and Cannon Road Reach 4A 234 College Boulevard / Cannon Road Reach 3 Assessment District 235 El Camino Real and Carlsbad Village Drive 236 El Camino Real and Faraday Avenue 237 El Camino Real at Aviara Parkway/Alga Road 238 El Camino Real Medians 239 El Camino Real Widening La Costa Avenue to Arenal Road 240 El Camino Real Widening - Lisa Street to Crestview Drive 241 El Camino Real Widening - North of Cougar Drive 242 El Camino Real Widening Tamarack Avenue to Chestnut Avenue 243 Faraday Avenue / Melrose Drive Extensions 244 Faraday Avenue Mitigation - South of Cannon Road 245 viii Street Projects (Continued) Interstate 5 and La Costa Avenue Auxiliary Lanes 246 Melrose Drive and Alga Road 247 Palomar Airport Road and College Boulevard 248 Palomar Airport Road Widening at Paseo Del Norte 249 Park Drive, Marina Drive to Cove Drive 250 Pavement Management Program 251 Poinsettia Lane East of El Camino Real Financing Program 252 Poinsettia Lane Widening (Paseo Del Norte to Batiquitos Lane) 253 Rancho Santa Fe Road and Olivenhain Road Improvements 254 Rancho Santa Fe Road North Phase I 255 Rancho Santa Fe Road North Phase II 256 Rancho Santa Fe Road South (To Encinitas) 257 Sidewalk / Street Construction Program 258 Traffic Monitoring Program 259 Underground District No. 17 (Roosevelt Street) 260 IX CIVIC PROJECTS ADMINISTRATIVE FACILITY PROJECTS FUNDING MATRIX FOR ADMINISTRATIVE FACILITIES PROJECTS PROJ NO. NEW 35721 35722 36551 PROJECT TITLE CIVIC CENTER CITY ADMIN TRAINING FACILITY (PRE-DESIGN) PUBLIC WORKS CENTER PUBLIC WORKS CENTER PUBLIC WORKS CENTER FUNDING SOURCE CFD#1 GCC CFD*1 WATER REPL SEWER REPL TOTAL BUDGET 24,051,000 100,000 13,325,750 5,877,500 2,810,000 FUTURE YEAR BUDGET AMOUNTS YEAR1 2005-2006 100,000 1,471,964 - - YEAR 2 2006-2007 10,617,484 5,877,500 2,810,000 YEAR 3 2007-2008 - YEAR 4 2008-2009 24,051,000 YEARS 2009-2010 YEAR 6-10 2010-2015 BUILDOUT 2015-2020 Page 1 o o CAPITAL PROJECT DESCRIPTION ADMINISTRATIVE FACILITIES - CIVIC CENTER PROJECT NAME o NONE PROJECT NO. PROJECT LOCATION MAP: ~v PROJECT LOCATION: El Camino Real and Faraday Avenue. PROJECT DESCRIPTION: Redesign the existing 128,000 square foot "Farmers Building" at the intersection of El Camino Real and Faraday Avenue as a future City Hall and Council Chambers complex. Project will consolidate all administrative operations and facilities in one location for organizational and operational efficiency. Include 1% for public art. PROJECT NEED: Required to meet Growth Management Standards. FINANCING: Purpose Estimated Cost Design/Construction $24,051,000 Total Cost = $24,051,000 Funding Source CFD#1 CITYHALL.doc Page 2 CAPITAL PROJECT DESCRIPTION ADMINISTRATIVE FACILITIES - CITY ADMINISTRATION TRAINING FACILITY PROJECT NAME NONE PROJECT NO. PROJECT LOCATION MAP: ill *] V ,'f PROJECT SITE \\ u PROJECT LOCATION: At either the Carlsbad Safety Center or the Carlsbad Municipal Water District building. PROJECT DESCRIPTION: Prepare design plans and specifications for a citywide training facility. When not in use by City personnel, facility would be available for professional development courses, computer training, and/or provide educational conference and meeting facility space for public and private sector organizations and educational institutions. PROJECT NEED: Facility would provide facilities and services for employee development activities sponsored by the City for its employees. FINANCING: Purpose Pre-Design Total Cost = Estimated Cost $100,000 $100,000 Funding Source GCC TRAININGFACILITY Page 3 o o CAPITAL PROJECT DESCRIPTION ADMINISTRATIVE FACILITIES - PUBLIC WORKS CENTER PROJECT NAME o 3572 & 3655 PROJECT NO. PROJECT LOCATION MAP: PROJECT PROJECT LOCATION: Phase II of Safety & Service Center, Orion Way. PROJECT DESCRIPTION: Construction of the Public Works Center and associated improvements. The project includes office, shops, yard, warehouse, and parking to accommodate the Public Works MSA. The warehouse will also provide forcitywide warehousing and storage. Additionally, the project increases Safety Center parking and includes funding for public art. PROJECT NEED: Required to meet Growth Management Standards. FINANCING: Purpose Estimated Cost Design/Construction $13,325,750 Design/Construction $2,810,000 Design/Construction $5,877,500 Funding Source CFD#1 Sewer Replacement Water Replacement Total Cost =$22,013,250 Annual Operating Cost = $159,080 COMMSERV.doc Page 4 POLICE AND FIRE FACILITY PROJECTS FUNDING MATRIX FOR POLICE AND FIRE FACILITY PROJECTS PROJ NO. 36881 39011 36851 36861 PROJECT TITLE FIRE STATION #3 RELOCATION FIRE STATION #5 STORAGE BUILDING/RESTROOMS FIRE STATION #6 (PERMANENT) POLICE & FIRE CAD IMPLEMENTATION PUBLIC SAFETY TRAINING FACILITY FUNDING SOURCE PFF GCC PFF GCC GCC TOTAL BUDGET 3,166,400 316,600 5,400,000 2,312,228 950,000 FUTURE YEAR BUDGET AMOUNTS YEAR1 2005-2006 1,799,500 YEAR 2 2006-2007 YEAR 3 2007-2008 264,120 YEAR 4 2008-2009 2,902,280 YEARS 2009-2010 YEAR 6-10 2010-2015 BUILDOUT 2015-2020 Page 5 CAPITAL PROJECT DESCRIPTION POLICE AND FIRE FACILITIES - FIRE STATION NO. 3 (RELOCATION) PROJECT NAME NONE PROJECT NO. PROJECT LOCATION MAP: PROJECT STE PROJECT LOCATION: Southwest corner of Carlsbad Village Drive and Glasgow Street adjacent to Calavera Park. PROJECT DESCRIPTION: This new station will be a 6,000 square foot suburban facility housing one 3-person engine company. It will be the same design as Stations 4 and 6. After relocation, the existing Fire Station No. 3 building and site will be sold. Includes 1% cost for public art in compliance with Ordinance No. 1279. PROJECT NEED: Relocation of this fire station is required to ensure a five minute response time within the northeast quadrant of the City as development occurs. FINANCING: Purpose Environmental Design Construction Admin/Inspection Total Cost = Estimated Cost Funding Source $2,000 $264,120 $2,506,100 $394,180 $3,166,400 PFF PFF PFF PFF FIRESTA3 Page 6 CAPITAL PROJECT DESCRIPTION POLICE AND FIRE FACILITIES - FIRE STATION NO. 5 STORAGE BUILDING/RESTROOMS PROJECT NAME 36881 PROJECT NO. PROJECT LOCATION MAP: 1YIR PROJECT LOCATION: 2540 Orion Way adjacent to the Public Safety Center and Fire Station No. 5. PROJECT DESCRIPTION: Construct a 2,469 square foot combined public restrooms/secure storage facility adjacent to Fire Station No. 5. The structure will be designed and built to provide for fire equipment storage and roof ventilation training. The structure will be designed to accommodate a future second floor. The overall design will incorporate the same building materials as the existing building. The public restrooms will serve citizens utilizing the new Skateboard Park. PROJECT NEED: Current storage has been outgrown and portable, plastic enclosures are being used to alleviate problem. Project will provide additional enclosed, secure storage space at Fire Station No. 5. Facility will also include restrooms, vending machines, drinking fountain and pay phone for citizens using Skateboard Park. FINANCING: Purpose Construction Total Cost = Estimated Cost Funding Source $316,600 GCC $316,600 FSSstor Page 7 CAPITAL PROJECT DESCRIPTION POLICE AND FIRE FACILITIES - FIRE STATION NO. 6 (PERMANENT) PROJECT NAME 39011 PROJECT NO. PROJECT LOCATION MAP: HKUJLU SITE PROJECT LOCATION: On the east side of the existing Rancho Santa Fe Road west of proposed Rancho Santa Fe Road. PROJECT DESCRIPTION: This new station will be a 6,200 square foot suburban facility housing one 3-person engine company. This station will require a traffic signal to gain access onto Rancho Santa Fe Road for response to emergencies. The signal will only be activated for emergency egress. This station also requires an access easement across the Habitat Conservation Plan area that requires approval of the Department of Fish & Game and the U.S. Wildlife Service. After construction, the existing temporary Station No. 6 will be dismantled and the land restored for use by the developer. Includes 1 % cost for public art in compliance with Ordinance No. 1279. PROJECT NEED: The fire station is required to ensure a five minute response time within the southeast corner of the City as development occurs. FINANCING: Purpose Environmental Design Construction Acquisition Admin/Inspection Total Cost = Estimated Cost $152,500 $450,000 $4,387,500 $60,000 $350,000 $5,400,000 Funding Source PFF PFF PFF PFF PFF FIRESTA6 Page 8 CAPITAL PROJECT DESCRIPTION POLICE AND FIRE FACILITIES - POLICE AND FIRE CAD IMPLEMENTATION PROJECT NAME 36851 PROJECT NO. PROJECT LOCATION MAP: NOT APPLICABLE PROJECT LOCATION: Safety Center. PROJECT DESCRIPTION: This project will replace an existing 13 year old Computer Aided Dispatch (CAD) system and implement an 800 MHz radio data communication system. The replacement of the CAD system is necessary due to the age and outmoded technology of the existing system and the inability to implement major portions of the data communications system due to the outmoded technology of the existing system. PROJECT NEED: The primary purpose of the CAD system is to enable the police and fire departments to provide a timely response to emergency incidents. This supports Council Goal Strategic Goal of Top Quality Services by being able to provide timely responses that result in high customer satisfaction and improve work processes through the use of best technology and information. The technology of the existing CAD system prevents the police and fire departments from implementing components of the 800 MHz Data Communication system such as Automatic Vehicle Locator (AVL), integration with City mapping system, records retrieval and field reporting. FINANCING: Purpose Installation Total Cost = Estimated Cost $2,312,228 $2,312,228 Funding Source GCC CAData Page 9 CAPITAL PROJECT DESCRIPTION POLICE AND FIRE FACILITIES - PUBLIC SAFETY TRAINING FACILITY PROJECT NAME 36861 PROJECT NO. PROJECT LOCATION MAP:PROJECT LOCATION: Adjacent to the Carlsbad Safety Center and Fire Station No. 5. PROJECT DESCRIPTION: Preparation of site and design plans for a 25-lane shooting range, 4-story fire training tower, 2-story residential training prop, outdoor seating pavilion, fire administration office building with classroom, and storage facilities. PROJECT NEED: Existing Police Training Range facility within Veterans Memorial Park will be removed with the construction of the City golf course project. FINANCING: Purpose Design/Studies Total Cost = Estimated Cost $950,000 $950,000 Funding Source GCC FIRINGRANGE Page 10 LIBRARY FACILITY PROJECTS FUNDING MATRIX FOR LIBRARY FACILITY PROJECTS PROJ NO. NEW NEW 37711 PROJECT TITLE LIBRARY EXPANSION (COLE) LIBRARY EXPANSION (COLE) LIBRARY EXPANSION (LEARNING CENTER - ADVANCE) LIBRARY EXPANSION (LEARNING CENTER - ADVANCE) LIBRARY EXPANSION (LEARNING CENTER) FUNDING SOURCE CFD#1 PFF GCC CFD#1 OTHER TOTAL BUDGET 4,378,600 9,400,000 600,000 1,497,398 958,163 FUTURE YEAR BUDGET AMOUNTS YEAR1 2005-2006 600,000 1,497,398 191,986 YEAR 2 2006-2007 YEAR 3 2007-2008 YEAR 4 2008-2009 YEARS 2009-2010 YEAR 6-10 2010-2015 BUILDOUT 2015-2020 4,378,600 9,400,000 Page 11 CAPITAL PROJECT DESCRIPTION LIBRARY FACILITIES - COLE LIBRARY EXPANSION PROJECT NAME NONE PROJECT NO. PROJECT LOCATION MAP:PROJECT LOCATION: At the site of the existing Cole Library, 1250 Carlsbad Village Drive, adjacent to the existing City Hall. PROJECT DESCRIPTION: Construction of a new 45,155 square foot library on the present site, east of the existing library building. PROJECT NEED: The Library Master Plan calls for expansion of the Cole Library to meet the growth management standard at buildout. The 1998 Feasibility Study recommends replacement of the existing library with a 45,155 square foot new building. This construction will satisfy the buildout growth management standard of 100,000+ square feet of library space. Project includes 1% for public art. FINANCING: Purpose Design/Construction Design/Construction Total Cost = Estimated Cost Funding Source $9,400,000 $4,378,600 $13,778,600 PFF CFD#1 EXP COLE Page 12 CAPITAL PROJECT DESCRIPTION LIBRARY FACILITIES - CARLSBAD LIBRARY LEARNING CENTER PROJECT NAME 37711 PROJECT NO. PROJECT LOCATION MAP: V--//PROJECT SITE PROJECT LOCATION: 3368 Eureka Place - adjacent to Holiday Park. PROJECT DESCRIPTION: The existing 5,723 square feet of building will be remodeled and a second story added consisting of 4,988 square feet (total 10,711 square feet). An existing home (housing Head Start) will be demolished and relocated to a modular building to be located on the east side of the property. The main building will allow the Adult Learning and Centra de Informacion to operate in a permanent location. PROJECT NEED: To provide a permanent location for the Adult Learning and Centra de Informacion programs. FINANCING: Purpose Construction Construction Construction Total Cost = Estimated Cost Funding Source $600,000 $1,497,398 $958,163 $3,055,561 GCC CFD#1 Other LEARNCTR Page 13 MISCELLANEOUS CITYWIDE PROJECTS FUNDING MATRIX FOR MISCELLANEOUS PROJECTS PROJ NO. 39601 34554 34557 34556 34553 39261 NEW NEW 36341 36501 PROJECT TITLE BICYCLE MASTER PLAN CFD#1 ADMINISTRATION COASTAL RAIL TRAIL COASTAL RAIL TRAIL COASTAL RAIL TRAIL - CORRIDOR ENHANCEMENT COASTAL RAIL TRAIL (CMAQ) OPPORTUNISTIC SAND PEDESTRIAN MASTER PLAN PEDESTRIAN MASTER PLAN PROPOSITION C PROJECTS PUBLIC WORKS INVENTORY AND FAC MAINT PROGRAM VILLAGE PUBLIC PARKING ENHANCEMENT PROGRAM FUNDING SOURCE TRANSNET/BIKE CFD#1 TRANSNET/BIKE OTHER GCC FED GRNT OTHER TDA GCC GCC GCC REDVL VILLAGE TOTAL BUDGET 150,000 1,100,000 221,801 184,176 110,000 4,113,784 57,240 100,000 150,000 22,711,000 404,992 850,000 FUTURE YEAR BUDGET AMOUNTS YEAR1 2005-2006 150,000 110,000 100,000 150,000 YEAR 2 2006-2007 110,000 YEAR 3 2007-2008 110,000 YEAR 4 2008-2009 110,000 YEARS 2009-2010 110,000 YEAR 6-10 2010-2015 550,000 22,711,000 850,000 BUILDOUT 2015-2020 Page 14 CAPITAL PROJECT DESCRIPTION MISCELLANEOUS CITYWIDE PROJECTS - BICYCLE MASTER PLAN PROJECT NAME 39601 PROJECT NO. PROJECT LOCATION MAP: N/A PROJECT LOCATION: N/A PROJECT DESCRIPTION: To study the City's bicycle needs and to develop a citywide bicycle network which will tie into regional bicycle paths and also with the City's Trails System. Construction of certain bicycle routes allows compliance with requirements of the Federal Clean Air Act. Requires completion of Environmental Impact Report. PROJECT NEED: In order to be eligible for certain funding sources, cities must have an adopted Bicycle Plan. FINANCING: Purpose Study/Report Environmental Total Cost = Estimated Cost Funding Source $50,000 $100,000 $150,000 TransNet/Bike TransNet/Bike BICYCLE.doc Page 15 CAPITAL PROJECT DESCRIPTION NONE MISCELLANEOUS CITYWIDE PROJECTS - COMMUNITY FACILITIES DISTRICT #1 ADMINISTRATION PROJECT NO PROJECT NAME PROJECT LOCATION MAP: N/A CFD#1ADM PROJECT LOCATION: N/A PROJECT DESCRIPTION: City costs to administer Communities Facilities District No. 1 (CFD #1). PROJECT NEED: Administration of Communities Facilities District No. 1 is needed to assure that the CFD #1 taxes are properly levied and collected in conformance with State law and to be certain that funding for the CFD #1 projects is available at the time of need for the various projects. FINANCING: Purpose Administration Total Cost = Estimated Cost Funding Source $1,100,000 CFD#1 $1,100,000 Page 16 CAPITAL PROJECT DESCRIPTION MISCELLANEOUS CITYWIDE PROJECTS - COASTAL RAIL TRAIL PROJECT NAME 3455 PROJECT NO. PROJECT LOCATION MAP LI IT 0 UdAN'jIUt PROJECT LOCATION: Within the San Diego Northern Railroad (SDNRR) right-of-way between the Oceanside Transit Station and the Encinitas Coaster Station. PROJECT DESCRIPTION: Construction of a 16-foot wide paved multi-modal bicycle/pedestrian trail including graded shoulders, landscaping, signage, safety devices at roadway crossings, bicycle loop detectors and other ancillary facilities. The Coastal Rail Trail through Carlsbad will be constructed in phases as funding allows. PROJECT NEED: The project accomplishes the Council goal of promoting multi-modal transportation facilities. The linking of four North County Coaster transit stations with a pedestrian/bicycle trail will encourage the use of non-motorized transport through the City, as well as to and from the transit stations. FINANCING: Purpose Design/Construction Design/Construction Design/Construction Estimated Cost $4,113,784 $221,801 $184,176 Funding Source TEA Trans/Bike APCD Total Cost = $4,519,761 Rl trail Page 17 o o CAPITAL PROJECT DESCRIPTION MISCELLANEOUS CITYWIDE PROJECTS - COASTAL RAIL TRAIL PROJECT NAME o 3455 PROJECT NO. PROJECT LOCATION MAP CIIY 0 UCLANSIUL PACIFIC OCEAN PROJECT LOCATION: Within the San Diego Northern Railroad (SDNRR) right-of-way between the Oceanside Transit Station and the Encinitas Coaster Station. PROJECT DESCRIPTION: Construction of a 16-foot wide paved multi-modal bicycle/pedestrian trail including graded shoulders, landscaping, signage, safety devices at roadway crossings, bicycle loop detectors and other ancillary facilities. The Coastal Rail Trail through Carlsbad will be constructed in phases as funding allows. PROJECT NEED: The project accomplishes the Council goal of promoting multi-modal transportation facilities. The linking of four North County Coaster transit stations with a pedestrian/bicycle trail will encourage the use of non-motorized transport through the City, as well as to and from the transit stations. FINANCING: Purpose Design/Construction Design/Construction Design/Construction Estimated Cost $4,113,784 $221,801 $184,176 Funding Source TEA Trans/Bike APCD Total Cost = $4,519,761 Rl trail Page 17 CAPITAL PROJECT DESCRIPTION MISCELLANEOUS CITYWIDE PROJECTS - COASTAL RAIL TRAIL CORRIDOR ENHANCEMENT PROJECT NAME 34556 PROJECT NO. PROJECT LOCATION MAP:PROJECT LOCATION: Located in the coastal zone within City jurisdiction. The project is located within the railroad right-of-way on the west side of the tracks between Tamarack Avenue and Carlsbad Village Drive. PROJECT DESCRIPTION: Enhancement of the west side of the railroad right-of-way between Carlsbad Village Drive and Tamarack Avenue. The right-of-way is 200 feet wide, 100 feet on both sides of the existing tracks. Enhancements would include such amenities as a trail parallel to the tracks, special landscape treatment, picnic tables, drinking fountains, exercise equipment, tables and other appropriate features that will provide an attractive staging area for groups and commuters. The project also proposes a formal pedestrian crossing at Chestnut Avenue. PROJECT NEED: The project enhances the downtown rail corridor providing landscaping and alternative uses for the rail corridor and would be a compliment to the Coastal Rail Trail Project (Project No. 3455). This project would enhance an area of the railroad right-of-way that traverses through the Carlsbad Village Area and could be used by citizens and visitors to the downtown area. The project provides an opportunity to enhance a blighted area of town and provide for a linear park amenity. FINANCING: Purpose Property Acquisition Design Total Cost = Estimated Cost $27,500 $82,500 $110,000 Funding Source GCC GCC Annual Operating Cost = $5,000 Railcorr Page 18 CAPITAL PROJECT DESCRIPTION MISCELLANEOUS PROJECTS - OPPORTUNISTIC SAND PROGRAM PROJECT NAME 39261 PROJECT NO. PROJECT LOCATION MAP: HIGHWAY 78 BEACH NOURISHMENT SITE PROJECT LOCATION: Along the Carlsbad coastline. PROJECT DESCRIPTION: Secure permits from the regulatory and resource agencies to allow the City to administer a program of using inland sources of beach quality material for an ongoing local beach nourishment program. PROJECT NEED: To allow for an ongoing beach nourishment activity on the Carlsbad coastline. FINANCING: Purpose Estimated Cost Funding Source Study/Permits $57,240 State Grant Total Cost = $57,240 OpporsndNEW Page 19 CAPITAL PROJECT DESCRIPTION MISCELLANEOUS CITYWIDE PROJECTS - PEDESTRIAN MASTER PLAN PROJECT NAME NONE PROJECT NO. PROJECT LOCATION MAP: N/A PROJECT LOCATION: N/A PROJECT DESCRIPTION: To study the City's pedestrian needs and develop a citywide pedestrian network which will tie into the City's trail system. Construction of certain pedestrian routes allow compliance with requirements of the Federal Clean Air Act. PROJECT NEED: A Pedestrian Master Plan is necessary to quality for certain funding sources. FINANCING: Estimated Cost Funding SourcePurpose Study/Report Study/Report Total Cost = $100,000 $150,000 $250,000 TDA GCC RED PLAN Page 20 CAPITAL PROJECT DESCRIPTION MISCELLANEOUS CITYWIDE PROJECTS - PROPOSITION "C" PROJECTS PROJECT NAME NONE PROJECT NO. PROJECT LOCATION MAP: N/A PROJECT LOCATION: In miscellaneous locations throughout the City not specifically determined at this time. PROJECT DESCRIPTION: Spending of funds from various sources including the General Fund in an amount over $1 million to construct recreational facilities including a swimming pool complex, trails linkages and open space, a city safety training facility and a portion of Cannon Road east of College Boulevard (known as Reach 4). PROJECT NEED: Projects are needed for various reasons including compliance with growth management standards, compliance with General Plan Goals and Objectives and other community needs. The expenditure of funds for these projects from various sources including the General Fund were approved by a vote of the qualified voters of Carlsbad in a general election. FINANCING: Projects Original Set Aside Aquatic Complex City/Safety Training Facility Cannon Road - Reach 4 Trails/Open Space Remaining Allocation Allocation $35,000,000 $11,239,000 $1 ,050,200 $0 $0 $22,711,000 * Other funding sources may be substituted such fund sources become available. in lieu of GCC Funds as PROP C Projects Page 21 CAPITAL PROJECT DESCRIPTION MISCELLANEOUS CITYWIDE PROJECTS - PUBLIC WORKS INVENTORY AND FACILITIES MANAGEMENT PROGRAM PROJECT NAME 36341 PROJECT NO. PROJECT LOCATION MAP: NOT APPLICABLE PROJECT LOCATION: N/A PROJECT DESCRIPTION: This project will create a comprehensive computer based geographical information system (GIS) for all capital improvements maintained within the Public Works Major Service Area. In addition to establishing a computer inventory of all Public Works facilities, the program will establish service standards, track maintenance histories, identify hazard areas, project future replacement and maintenance needs and project future staffing levels needed to maintain the existing and projected Public Works inventory. PROJECT NEED: This project is needed to modernize the Public Works functions of the City. Presently, the inventory control and maintenance programming functions of the Public Works Service Area are disjointed, minimal or non-existent. This results in lowered maintenance and staffing efficiency. Completion of the program will result in better utilization of staff resources, improved maintenance of Public Works facilities, improved budgeting for maintenance services and capital projects and decreased facility life cycle costs. FINANCING: Purpose Data Acquisition/Programs Total Cost = Estimated Cost $404,992 $404,992 Funding Source GCC PWINVENT Page 22 CAPITAL PROJECT DESCRIPTION 36501 MISCELLANEOUS CITY WIDE PROJECTS - VILLAGE PUBLIC PARKING ENHANCEMENT PROGRAM PROJECT NO. PROJECT NAME PROJECT LOCATION MAP:PROJECT LOCATION: Within boundaries of Village Redevelopment Area. PROJECT DESCRIPTION: Implementation of recommendations within Village Parking Program, which include acquisition of land for future public parking, a study of impediments to full utilization of existing public parking lots, and improvements to existing public parking lots (as needed) to encourage full utilization of existing public parking lots. PROJECT NEED: Parking in the Village Redevelopment Area has been an issue for several years. A Village Parking Program is currently being prepared to address various parking issues within the Village. This program will identify recommended actions to pursue to address the underutilization of existing public parking lots and to plan for future parking needs. The proposed projects are consistent with the needs to address parking in the Village. FINANCING: Purpose Land Acquisition Total Cost = Estimated Cost $850,000 $850,000 Funding Source Village Redevelopment VILLGPKG Page 23 FACILITY MAINTENANCE PROJECTS FACILITY MAINTENANCE PROJECTS FUNDING MATRIX FOR FACILITIES MAINTENANCE PROJECTS PROJ NO. 38961 38841 39421 38971 39431 NEW 36381 35761 38611 39361 39371 39441 39241 PROJECT TITLE BEACH ACCESS STAIRS REPLACEMENT CHASE FIELD LIGHTING IMPROVEMENTS COLE LIBRARY HVAC REPLACEMENT HOLIDAY PARK - RESTROOM IMPROVEMENTS LACUNA RIVIERA PARK RESTROOM REPLACEMENT REPAIR RECOATING GUARDRAIL PAR BRIDGE AT CARLSBAD BLVD SAFETY CENTER - BUILDING IMPROVEMENTS SAFETY CENTER - CONFERENCE CENTER REFURBISHMENT SENIOR CENTER COURTYARD LANDSCAPING STAGECOACH PARK PICNIC SHELTER STAGECOACH PARK SYNTHETIC TURF TOT LOT IMPROVEMENTS VARIOUS FACILITY CONCRETE REPAIRS FUNDING SOURCE IRF IRF IRF IRF IRF GCC GCC GCC GCC GCC GCC IRF IRF TOTAL BUDGET 517,500 300,000 1,264,600 530,808 260,000 130,000 157,540 200,000 30,000 100,000 1,600,000 259,500 256,265 FUTURE YEAR BUDGET AMOUNTS YEAR1 2005-2006 217,500 1,200,700 225,000 90,000 130,000 97,500 YEAR 2 2006-2007 YEAR 3 2007-2008 YEAR 4 2008-2009 YEARS 2009-2010 YEAR 6-10 2010-2015 BUILDOUT 2015-2020 Page 24 CAPITAL PROJECT DESCRIPTION FACILITIES MAINTENANCE - BEACH ACCESS REPAIR/UPGRADES PROJECT NAME 38961 PROJECT NO. PROJECT LOCATION MAP: PROJECT SITE ' PROJECT LOCATION: Beach accesses at Christiansen Way, Beech Street, Carlsbad Village Drive, Grand Avenue, Rue Des Chateaux, Tamarack Avenue, Cherry Avenue, Maple Avenue, and Sycamore Avenue. PROJECT DESCRIPTION: Provide major repairs to beach accesses, replace existing deteriorated beach access steps, railing, and foundations. Upgrade base (re-engineer) to withstand high surf conditions, use heavy aluminum for handrails to replace existing eroded galvanized metal. PROJECT NEED: Major repairs are required to keep the beach accesses in a long-term safe condition. These improvements will dramatically reduce the amount of labor and materials currently being expended on painting and maintenance of steps and handrails. FINANCING: Purpose Design Construction Admin/Inspection Total Cost = Estimated Cost $37,000 $474,500 $6,000 $517,500 Funding Source IRF IRF IRF BEACHACC2 Page 25 CAPITAL PROJECT DESCRIPTION FACILITIES MAINTENANCE- CHASE FIELD LIGHTING IMPROVEMENT PROJECT NAME 38841 PROJECT NO. PROJECT LOCATION MAP: CHESTNUT AVE. PROJECT LOCATION: 3433 Harding (corner of Chestnut and Harding). PROJECT DESCRIPTION: Replacement of obsolete sports lighting and upgrade of site electrical systems to current electrical codes and standards. Construction includes demolition of the existing systems, abandonment of the obsolete underground and above ground electrical systems, replacement of the electrical systems with new equipment that meets current electrical code requirements, replacement of 14 sports light assemblies on wooden poles with 8 galvanized steel sports lights. Open trenching and boring of sports light foundations will be the primary methods of construction. PROJECT NEED: Chase Field was constructed approximately 25 years ago with volunteer efforts. The current sports lighting and site electrical systems are in poor condition and does not meet current Little League lighting standards or current electrical code. The project is intended to replace all these deficiencies with modern equipment that will provide increased safety to the public and better off site light control to minimize effects on the local residents. FINANCING: Purpose Design/Reports Construction Total Cost = Estimated Cost $28,000 $272,000 $300,000 Funding Source IRF IRF CHASE_#2 Page 26 CAPITAL PROJECT DESCRIPTION FACILITIES MAINTENANCE - COLE LIBRARY HVAC REPLACEMENT PROJECT NAME 39421 PROJECT NO. PROJECT LOCATION MAP:PROJECT LOCATION: Cole Library- 1250 Carlsbad Village Drive. PROJECT DESCRIPTION: Complete refurbishing or replacement of the current HVAC system with modern, energy efficient HVAC systems to improve reliability, efficiency, and reduce repair and maintenance costs. PROJECT NEED: The HVAC system is in need of major refurbishment or complete replacement in order to provide environmental control of the Cole Library. Major components of the system are in poor condition due primarily to age. At this time, it is not cost-effective to continue the intensive maintenance that is required to keep the system operational. There is a potential for a major component failure due to the age of the system that would render the entire system non-operational. FINANCING: Purpose Design/Studies Construction Total Cost = Estimated Cost $40,000 $1,224,600 $1,264,600 Funding Source IRF IRF Colejib Page 27 CAPITAL PROJECT DESCRIPTION FACILITIES MAINTENANCE - HOLIDAY PARK RESTROOM IMPROVEMENTS PROJECT NAME 38971 PROJECT NO. PROJECT LOCATION MAP:PROJECT LOCATION: The two (2) restrooms are located in Holiday Park adjacent to Pio Pico Avenue. PROJECT DESCRIPTION: This project includes rehabilitating the two (2) existing 400 square foot facilities for wheelchair accessibility, installation of additional stalls and accessories, and roof replacements. PROJECT NEED: This project will meet the Council goal of providing Top Quality Services and will also comply with ADA standards. FINANCING: Purpose Design Construction Inspection Total Cost = Estimated Cost $27,000 $491,308 $12,500 $530,808 Funding Source IRF IRF IRF Holiday Page 28 CAPITAL PROJECT DESCRIPTION FACILITIES MAINTENANCE - LACUNA RIVIERA PARK RESTROOM REPLACEMENT PROJECT NAME 39431 PROJECT NO. PROJECT LOCATION MAP:PROJECT LOCATION: Corner of Park Drive and Kelly Drive, adjacent to Kelly School. PROJECT DESCRIPTION: Remodel and/or replace existing park restrooms. PROJECT NEED: The facilities have deteriorated with age and constant use. To keep the park in a top-quality condition, a complete remodel or reconstruction of the structure is necessary. FINANCING: Purpose Design Construction Inspection Total Cost = Estimated Cost $10,000 $240,000 $10,000 $260,000 Funding Source IRF IRF IRF Lagunapk Page 29 CAPITAL PROJECT DESCRIPTION FACILITIES MAINTENANCE - REPAIR/RECOAT GUARDRAIL PALOMAR AIRPORT BRIDGE AT CARLSBAD BOULEVARD PROJECT NAME NONE PROJECT NO. PROJECT LOCATION MAP: \fc\\ PROJECT SITE PROJECT LOCATION: Palomar Airport Bridge over San Diego Northern Railway tracks at Carlsbad Boulevard. PROJECT DESCRIPTION: On the existing bridge, remove existing coating on steel guardrail and apply a new moisture cured urethane coating to steel. Lead paint removal may be required which involves vacuum recovery system. Repair guardrail supports, clean sidewalks, investigate cracks on concrete columns, and make remedial repairs if required. PROJECT NEED: Existing bridge has severe corrosion on steel guardrails. Cracks at guardrail supports need to be repaired with epoxy cement. FINANCING: Purpose Study Construction Admin Total Cost = Estimated Cost $10,000 $110,000 $10,000 $130,000 Funding Source GCC GCC GCC PARBridge Page 30 CAPITAL PROJECT DESCRIPTION FACILITIES MAINTENANCE - SAFETY CENTER BUILDING IMPROVEMENTS PROJECT NAME 36381 PROJECT NO. PROJECT LOCATION MAP: PROJECT SITE PROJECT LOCATION: The Public Safety Center at 2560 Orion Way. PROJECT DESCRIPTION: Upgrade and renovate several areas of the Safety Center including the Community Services Area, Report Writing Area, Patrol Civilian Community Services Officer Area, Sally Port Area, and Crime Lab/Cal ID Area and Conference Facility. Also included is the replacement of numerous broken chairs. PROJECT NEED: The Safety Center has now been in service for 14 years. There are several areas where upgrades or improvements are needed to eliminate unsightly conditions and improve occupant safety. Also proposed are some minor modifications to improve functionality, service quality and customer satisfaction. FINANCING: Purpose Construction Total Cost = Estimated Cost $157,540 $157,540 Funding Source GCC SCTRMISC Page 31 CAPITAL PROJECT DESCRIPTION 35761 FACILITIES MAINTENANCE - SAFETY CENTER - CONFERENCE CENTER REFURBISHMENT PROJECT NO PROJECT NAME PROJECT LOCATION MAP: PROJECT SITE PROJECT LOCATION: 2560 Orion Way. PROJECT DESCRIPTION: Renovate Conference Center - including new public address and video projection system, new lighting, new wall covering, carpet and new tables and seating. PROJECT NEED: Conference Center is fourteen years old and is in need of renovation. Public address system is antiquated and obsolete. New system would provide for computer presentations similar to those in City Council Chambers, improved lighting and control system, improved acoustics with new wall coverings, etc. FINANCING: Purpose Construction Total Cost = Estimated Cost $200,000 $200,000 Funding Source GCC SCTRCONF Page 32 CAPITAL PROJECT DESCRIPTION FACILITIES MAINTENANCE - CARLSBAD SENIOR CENTER COURTYARD RENOVATION PROJECT NAME 38611 PROJECT NO. PROJECT LOCATION MAP:PROJECT LOCATION: Carlsbad Senior Center, 799 Pine Avenue. PROJECT DESCRIPTION: Re-landscape and upgrade the courtyard at the Carlsbad Senior Center including planting, irrigation new planters, hardscape improvements and possibly a water feature. PROJECT NEED: Landscaping in the Senior Center Courtyard has become overgrown during the past 12 years. A new plan incorporating new plantings and development of more user-friendly space is needed to make this feature of the facility more usable by the many customers. FINANCING: Purpose Design Construction Total Cost = Estimated Cost Funding Source $5,000 $25,000 $30,000 GCC GCC Senctryd Page 33 CAPITAL PROJECT DESCRIPTION FACILITIES MAINTENANCE - STAGECOACH PARK PICNIC SHELTER PROJECT NAME 39361 PROJECT NO. PROJECT LOCATION MAP:PROJECT LOCATION: Stagecoach Community Park, 3420 Camino de los Coches. PROJECT DESCRIPTION: Remove volleyball court and build picnic shelter. PROJECT NEED: To increase usage of Stagecoach Community Park by providing a shaded picnic area near an athletic field. FINANCING: Purpose Design Construction Admin/Inspection Total Cost = Estimated Cost $15,000 $77,000 $8,000 $100,000 Funding Source GCC GCC GCC Picnic Page 34 CAPITAL PROJECT DESCRIPTION FACILITIES MAINTENANCE - STAGECOACH PARK SYNTHETIC TURF FIELDS PROJECT NAME 39371 PROJECT NO. PROJECT LOCATION MAP:PROJECT LOCATION: Stagecoach Park - Camino de los Coches PROJECT DESCRIPTION: Construct/install synthetic turf fields on field numbers 2 and 3 at Stagecoach Park. PROJECT NEED: Existing fields are in very poor condition and they cannot take the constant wear-and-tear from soccer and baseball activities. The growth in population has created a demand for fields that cannot be met with prolonged periods of closure. These fields will be open 365 days a year and maintenance cost can be reduced. FINANCING: Purpose Design Construction Admin/Inspection Total Cost = Estimated Cost Funding Source $25,000 $1,500,000 $75,000 $1,600,000 IRF IRF IRF Stgcoach2 Page 35 CAPITAL PROJECT DESCRIPTION FACILITIES MAINTENANCE - TOT LOT IMPROVEMENT PROJECTS PROJECT NAME 39441 PROJECT NO. PROJECT LOCATION MAP: PROJECT, SITE PROJECT SITE PROJECT SITE PROJECT SITE PROJECT SITE PROJECT LOCATION: • Stagecoach Park • Holiday Park • Scout House PROJECT DESCRIPTION: Hosp Grove Laguna Riviera Poinsettia Park • La Costa Canyon Park This is the third and final phase for the tot lot improvement project. Phase III includes removing and replacing tot lot equipment, and installation of a rubberized surface. PROJECT NEED: This project is the final phase of updating existing playground equipment to comply with ADA and safety standards. FINANCING: Purpose Construction Total Cost = Estimated Cost $259,500 $259,500 Funding Source IRF Tot lotNEW Page 36 CAPITAL PROJECT DESCRIPTION FACILITIES MAINTENANCE - VARIOUS FACILITY CONCRETE REPAIRS PROJECT NAME 39241 PROJECT NO. PROJECT LOCATION MAP: VARIOUS CITYWIDE LOCATIONS Concrete PROJECT LOCATION: Various park and civic center locations. PROJECT DESCRIPTION: Removal and replacement of damaged concrete, flatwork, driveways, curbs, stairs, and parking lot islands at multiple facilities and parks throughout the City. PROJECT NEED: Multiple service areas have concrete surface improvements that are in need of repair. FINANCING: Purpose Construction Total Cost = Estimated Cost Funding Source $256,265 IRF $256,265 Page 37 PARKS PROJECTS CITYWIDE PARKS PROJECTS FUNDING MATRIX FOR CITYWIDE PARKS PROJECTS PROJ NO. 39721 38661 NEW NEW PROJECT TITLE BUSINESS PARK RECREATIONAL FACILITY CARLSBAD MUNICIPAL GOLF COURSE LAKE CALAVERA TRAILS MASTER PLAN/CONSTRUCTION SENIOR CTR EXPANSION - 1ST FLOOR SENIOR CTR EXPANSION - 2ND FLOOR VETERAN'S MEMORIAL PARK FUNDING SOURCE ZONES GOLF COURSE GCC REDVL VILLAGE GCC CFD#1 TOTAL BUDGET 2,967,400 39,784,200 497,000 615,000 329,000 20,719,680 FUTURE YEAR BUDGET AMOUNTS YEAR1 2005-2006 36,803,000 397,000 615,000 329,000 YEAR 2 2006-2007 YEAR 3 2007-2008 YEAR 4 2008-2009 YEARS 2009-2010 YEAR 6-10 2010-2015 10,359,840 BUILDOUT 2015-2020 2,967,400 10,359,840 Page 38 o o CAPITAL PROJECT DESCRIPTION CITYWIDE PARKS PROJECTS - BUSINESS PARK RECREATIONAL FACILITY PROJECT NAME o NONE PROJECT NO. PROJECT LOCATION MAP: ^PROJECTSITE PROJECT LOCATION: In Zone 5, at the corner of Faraday and Camino Hills. PROJECT DESCRIPTION: In FY 98-99, the City acquired 13 acres to develop into the Business Park Recreation Facility. Proposed amenities may include a fitness center, swimming pool, ball fields, soccer fields, basketball, handball, volleyball courts, picnic areas, jogging trails, etc. It is anticipated that staff will meet with the business park community to gather input into the most needed amenities. The City may explore privatization options for a portion of the development (e.g., the fitness center) which may accelerate development Project includes 1% for public art. PROJECT NEED: Demand and need for recreational facilities within the industrial area identified through a Parks and Recreation Commission subcommittee who conducted two independent surveys and received input from Zone 5, 13, and 16 developers. FINANCING: Purpose Design/Construction Total Cost = Estimated Cost Funding Source $2,967,400 Zone 5 Fee $2,967,400 BUS PARK.doc Page 39 CAPITAL PROJECT DESCRIPTION CITYWIDE PARKS PROJECTS - CARLSBAD MUNICIPAL GOLF COURSE PROJECT NAME 39721 PROJECT NO. PROJECT LOCATION MAP: AVE. PROJECT LOCATION: Palomar Airport Road and College Boulevard. PROJECT DESCRIPTION: Design and construct an 18-hole championship golf course. Work will include grading, landscaping a clubhouse, access roads and utilities. The Golf Course Steering Committee may consider additional features to be included. PROJECT NEED: Because of strong citizen interest, the Parks and Recreation Commission recommended building a golf course. Part of the Parks and Recreation Element of the General Plan. FINANCING: Purpose Estimated Cost Design/Environmental $2,981,200 Construction $36,803,000 Funding Source Golf Course Enterprise Fund Golf Course Enterprise Fund Total Cost =$39,784,200 Annual Operating Cost = $195,000 GOLFDEV.doc Page 40 O (0 UJ Q Cv OLU a.<o o UJ oOLQ. UJ < oUJ O Q. oIo oUJ 3tt Q. Z O oo oUl 3OLQ. ro ro co M_ 18 !G ro g I CO co "roO) & O 20) jo roO CO drantPTIONS CO _S«"O .CO ~ CO O .ro ° '55 co S •— co _- ~ o *;.* 5 w co CM "Cro .Q = > o_i -J5 2 ro g a. ~ Q O w p O — ® Tl "° O S S 8 § & 8£i S." ~ o w s:= O ro 'e/>m•o — -o east Quahe NoCO ff _ O) i;§ b |'") g i co * co o•5 £ w .S ° E >,'ro 2 -^o -° J= Q. en i= glj -O T-, >, •o ro 5 a) jo ^ c ro _ co °- CD 2 co S> g ro j= o> » .-e^ ro 3Q. ro c c ^o ~ E OJECT DESCR£ a. ,_ ro w "o gtiill •5-E o ro c ^co £ O O ^ u. W ,9O n tom O O OO O OCDOCD cuenresQ- o o oo o oO O 0 m" T-" T-~<N ^r co««•<«• ^ oo •»-» O => •B i £ o a fc Q) > => « Q•S5 b §. ,_ ft J> UJ- Q-.O QL Q. ts 2 i » ° E •s-5 E§°^ O&'S^ro >« « •£W ro C T3 <0 cZ 2 ro 3 g a)I— ro 2 CO ro 12 .. "m 11s.> w c C 0) OUJ Q O c-1 oooo"CN la> °-O "ro (D.*:CO CAPITAL PROJECT DESCRIPTION CITYWIDE PARKS PROJECTS - SENIOR CENTER EXPANSION 1ST FLOOR PROJECT NAME NONE PROJECT NO. PROJECT LOCATION MAP: PROJECT SITE PROJECT LOCATION: Senior Center Building located at Pine Avenue and Harding Street. PROJECT DESCRIPTION: ,STTenant improvements to the 1 floor area of existing Senior Center. Improvements include exercise rooms, art room, t.v. room, multi-purpose room, game room, health screening room, and computer room. PROJECT NEED: Needed to meet the needs of a growing senior population and expanding program needs. FINANCING: Purpose Design/Construction Total Cost = Estimated Cost $615,000 $615,000 Funding Source Redev Village SeniorCtM Page 42 CAPITAL PROJECT DESCRIPTION CITYWIDE PARKS PROJECTS - SENIOR CENTER EXPANSION 2ND FLOOR PROJECT NAME NONE PROJECT NO. PROJECT LOCATION MAP: PROJECT SITE PROJECT LOCATION: Senior Center Building located at Pine Avenue and Harding Street. PROJECT DESCRIPTION: -,ndTenant improvements to the 2 floor area of existing Senior Center (approximately 5,770 square feet) into City offices. PROJECT NEED: Needed office space for City functions. FINANCING: Estimated CostPurpose Desig n/Construction Total Cost = $329,000 $329,000 Funding Source GCC SeniorCtr2 Page 43 CAPITAL PROJECT DESCRIPTION CITYWIDE PARKS PROJECTS - VETERAN'S MEMORIAL PARK PROJECT NAME NONE PROJECT NO. PROJECT LOCATION MAP:PROJECT LOCATION: This property is located south and east of Agua Hedionda Lagoon, near the geographic center of Carlsbad. PROJECT DESCRIPTION: The Master Plan for development of Veteran's Memorial Park includes the following improvements: streets, utilities, community leisure needs, open space interpretive area, parking and maintenance facility. Other suggested uses for this park area include amphitheater complex, sports complex, conference center and numerous other active/passive recreational amenities. Project funding includes 1 % for public art. PROJECT NEED: The Macario Canyon property has been under City lease or ownership for a number of years. The development of this property, since it is centrally located, would provide the needed parkland for all quadrants at buildout. Part of the Parks and Recreation Element of the General Plan. FINANCING: Purpose Design/Construction Total Cost = Estimated Cost $20,719,680 $20,719,680 Funding Source CFD#1 VETERAN Page 44 NORTHWEST QUADRANT PARKS PROJECTS FUNDING MATRIX FOR NORTHWEST QUADRANT PARKS PROJECTS PROJ NO. 38022 PROJECT TITLE PARKLAND ACQUISITION PINE AVENUE PARK - PHASE 1 PINE AVENUE PARK - PINE COMMUNITY BUILDING - PHASE II PINE AVENUE PARK - PINE COMMUNITY BUILDING - PHASE II FUNDING SOURCE PIL-NW PFF PIL-NW PFF TOTAL BUDGET 600,000 7,082,000 1,400,000 6,192,000 FUTURE YEAR BUDGET AMOUNTS YEAR1 2005-2006 YEAR 2 2006-2007 YEARS 2007-2008 YEAR 4 2008-2009 539,000 YEARS 2009-2010 600,000 1,400,000 5,653,000 YEAR 6-10 2010-2015 BUILDOUT 2015-2020 Page 45 CAPITAL PROJECT DESCRIPTION NORTHWEST QUADRANT PARKS - PARK ACQUISITION PROJECT NAME NONE PROJECT NO. PROJECT LOCATION MAP: HIGHWAY PROJECT LOCATION: To be determined at various locations within the northwest quadrant. PROJECT DESCRIPTION: Acquire additional park land required by Growth Management Standards. PROJECT NEED: To meet Growth Management Standards and the General Plan. FINANCING: Purpose Estimated Cost Funding Source Restoration/Acquisition $600,000 PIL-NW Total Cost = $600,000 NWQUADPK Page 46 CAPITAL PROJECT DESCRIPTION NORTHWEST QUADRANT PARKS - PINE AVENUE PARK PHASE I PROJECT NAME 38022 PROJECT NO. PROJECT LOCATION MAP: SITE PROJECT LOCATION: Pine School site; within the block of Harding, Pine, Chestnut and Madison. PROJECT DESCRIPTION: Develop seven (7) acres of land as a park. Development may include lighted baseball fields, lighted multi-use turfed area, roofed picnic structure, parking lot, tot-lot and landscaping. Construct a 20,000 square foot community center/gymnasium. Facility will include basketball, volleyball, gymnastics, aerobic exercise areas, meeting rooms, kitchen and office space. Also includes 1 % for public art. PROJECT NEED: Required to meet Growth Management Standards and identified in the Parks and Recreation Element of the General Plan. FINANCING: Purpose Design Construction Admin/Inspection Total Cost = Estimated Cost $1,038,000 $5,574,076 $469,924 $7,082,000 Funding Source PFF PFF PFF Annual Operating Cost = $120,000 Parksit2 Page 47 0 O CAPITAL PROJECT DESCRIPTION NORTHWEST QUADRANT PARKS - PINE AVENUE PARK - PHASE II (COMMUNITY BUILDING) PROJECT NAME O NONE PROJECT NO. PROJECT LOCATION MAP:PROJECT LOCATION: Pine School site; within the block of Harding, Pine, Chestnut and Madison. PROJECT DESCRIPTION: Construct a 20,000 square foot community facility/gymnasium. Facility will include basketball, volleyball, gymnastics, multi-purpose rooms, meeting rooms, teen center, and office space. PROJECT NEED: Required to meet Growth Management Standards, identified in the Parks and Recreation Element of the General Plan, and meets Recreation Facility Guidelines for one community center per quadrant. FINANCING: Purpose Design/Admin Construction Total Cost = Estimated Cost $1,400,000 $6,192,000 $7,592,000 Funding Source PIL-NW PFF Pinepkll Page 48 NORTHEAST QUADRANT PARKS PROJECTS FUNDING MATRIX FOR NORTHEAST QUADRANT PARKS PROJECTS PROJ NO. 38561 36981 38011 PROJECT TITLE HIDDEN CANYON PARK (22.3 ACRES) PARK SITE ACQUISITION (15 ACRES) NE QUADRANT PARK PARK SITE DEVELOPMENT (15 ACRES) FUNDING SOURCE PIL-NE PFF PIL-NE TOTAL BUDGET 1,886,766 4,550,000 4,000,000 FUTURE YEAR BUDGET AMOUNTS YEAR1 2005-2006 YEAR 2 2006-2007 YEAR 3 2007-2008 YEAR 4 2008-2009 YEARS 2009-2010 YEAR 6-10 2010-2015 BUILDOUT 2015-2020 4,000,000 Page 49 CAPITAL PROJECT DESCRIPTION NORTHEAST QUADRANT PARKS - HIDDEN CANYON PARK PROJECT NAME 38561 PROJECT NO. PROJECT LOCATION MAP:PROJECT LOCATION: This project is located in the northeast quadrant on the north side of Carlsbad Village Drive, west of Concord Street. PROJECT DESCRIPTION: This 22.3 acre site is constrained by steep slopes, sensitive habitat and power lines. For that reason, grading and development will be confined to a small area. Park development may consist of limited grading and construction of two tot-lots, restroom, a picnic area, a level turfed area, a parking lot at Vancouver Street, expansion of gravel parking lot at Dog Park, and a trail system. Project funding includes 1% for public art. PROJECT NEED: Part of the Parks and Recreation Element of the General Plan and required to meet Growth Management Standards. Currently there are numerous apartments and attached housing projects in this area with a large number of children requiring recreational area. FINANCING: Purpose Design Construction Admin/Inspection Total Cost = Estimated Cost $90,000 $1,664,766 $132,000 $1,886,766 Funding Source PIL-NE PIL-NE PIL-NE Annual Operating Cost = $120,000 HIDCIMYPK Page 50 CAPITAL PROJECT DESCRIPTION NORTHEAST QUADRANT PARK - PARK SITE ACQUISITION PROJECT NAME 36981 PROJECT NO. PROJECT LOCATION MAP: HWY /a PROJECT PROJECT LOCATION: In the northeast quadrant. Possibly to be within the Robertson Ranch, at the future site of the flood control project just northeast of Rancho Carlsbad Mobile Home Park and adjacent to the future CUSD high school site. PROJECT DESCRIPTION: Acquire ± 15 acres for future development of ball fields. PROJECT NEED: Because of development constraints, Larwin Park was unable to fulfill the need for active ball fields. Therefore, ± 15 acres will be acquired somewhere in the northeast quadrant for ballfield development to meet the City's guidelines for numbers of ball fields per quadrant. FINANCING: Purpose Land Acquisition Total Cost = Estimated Cost $4,550,000 $4,550,000 Funding Source PFF NEQUAD_1 Page 51 PROJECT LOCATION MAP: CAPITAL PROJECT DESCRIPTION NORTHEAST QUADRANT PARKS - PARK SITE DEVELOPMENT PROJECT NAME 38011 PROJECT NO. PROJECT PROJECT LOCATION: In future Robertson Ranch development near the corner of Cannon Road and El Camino Real. PROJECT DESCRIPTION: Develop ± 15 acres for soccer fields with restrooms and parking. PROJECT NEED: Because of development constraints, Hidden Canyon Park was unable to fulfill the need for active ball fields. Therefore, ± 15 acres will be developed somewhere in the northeast quadrant for sports fields to meet the City's guidelines for numbers of sports fields per quadrant. FINANCING: Purpose Construction Total Cost = Estimated Cost $4,000,000 $4,000,000 Funding Source PIL-NE NEQUAD 3 Page 52 SOUTHWEST QUADRANT PARKS PROJECTS FUNDING MATRIX FOR SOUTHWEST QUADRANT PARKS PROJECTS PROJ NO. 36991 36491 39451 PROJECT TITLE AVIARA COMMUNITY PARK (24.25 ACRES) * AVIARA COMMUNITY PARK COMMUNITY BUILDING AVIARA COMMUNITY PARK COMMUNITY BUILDING AVIARA REIMBURSEMENT AGREEMENT POINSETTIA COMMUNITY PARK - PHASE II FUNDING SOURCE PFF PFF PIL-SW PIL-SW PFF TOTAL BUDGET 10,700,000 5,444,000 1,925,000 238,000 11,645,000 FUTURE YEAR BUDGET AMOUNTS YEAR1 2005-2006 YEAR 2 2006-2007 YEAR 3 2007-2008 YEAR 4 2008-2009 YEARS 2009-2010 844,000 YEAR 6-10 2010-2015 10,801,000 BUILDOUT 2015-2020 5,444,000 1,925,000 Page 53 CAPITAL PROJECT DESCRIPTION SOUTHWEST QUADRANT PARKS -AVIARA COMMUNITY PARK - PHASE I PROJECT NAME 36991 PROJECT NO. PROJECT LOCATION MAP:PROJECT LOCATION: Northwest corner of Poinsettia Lane and Ambrosia Road. PROJECT DESCRIPTION: Construction of a 24-acre community park that would provide one lighted adult soccer field, one ballfield, two 1/2 court basketball court, tot-lot, open turf and picnic area, parking, and a maintenance building. Project includes 1% for Public Art. PROJECT NEED: Required to meet Growth Management Standards and identified in the Parks and Recreation Element of the General Plan. FINANCING: Purpose Planning/Study Environmental Design Construction Total Cost = Estimated Cost $235,000 $15,000 $250,000 $10,200,000 $10,700,000 Funding Source PFF PFF PFF PFF Annual Operating Cost = $340,000 Zone19-l Page 54 CAPITAL PROJECT DESCRIPTION NONE SOUTHWEST QUADRANT PARKS - AVIARA COMMUNITY PARK - PHASE II (COMMUNITY BUILDING) PROJECT NO. PROJECT NAME PROJECT LOCATION MAP: HKUJLUSITE PROJECT LOCATION: In the southwest quadrant at the northern end of the Aviara community at the intersection of Poinsettia Lane and Ambrosia. PROJECT DESCRIPTION: Construction of a 18,000 square foot community facility that would include meeting and activity rooms and park offices. Project includes 1 % for Public Art. PROJECT NEED: Required to meet Growth Management Standards and identified in the Parks and Recreation Element of the General Plan and meets the Recreation Facility Guidelines. FINANCING: Purpose Design/Construction Design/Construction Total Cost = Estimated Cost $1,925,000 $5,444,000 $7,369,000 Funding Source PIL-SW PFF Zone19ll Page 55 CAPITAL PROJECT DESCRIPTION SOUTHWEST QUADRANT PARKS - AVIARA REIMBURSEMENT AGREEMENT PROJECT NAME 36491 PROJECT NO. PROJECT LOCATION MAP:PROJECT LOCATION: In the southwest quadrant, at the northern tip of Zone 19, north of Poinsettia Lane and west of El Camino Real. PROJECT DESCRIPTION: This is a reimbursement to the Aviara Land Associates Company made in accordance with the Aviara Master Plan parks agreement relating to the acquisition of property for the future Zone 19 park site. PROJECT NEED: The Zone 19 park is required to meet growth management for park land within the southwest quadrant. FINANCING: Purpose Reimbursement Total Cost = Estimated Cost $238,000 $238,000 Funding Source PIL-SW Aviareim Page 56 CAPITAL PROJECT DESCRIPTION SOUTHWEST QUADRANT PARKS - POINSETTIA COMMUNITY PARK (PHASE II) PROJECT NAME 39451 PROJECT NO. PROJECT LOCATION MAP:PROJECT LOCATION: Poinsettia Community Park in the southwest quadrant east of Paeo del Norte between Palomar Airport Road and Poinsettia Lane. PROJECT DESCRIPTION: Phase II of this 42 acre park includes development of the remainder of the facilities called out in the Master Plan and not developed in earlier Phases. Amenities will include a community facility/gymnasium, enclosed soccer field, tot lot, picnic areas, tennis complex, and additional parking. Includes 1% for public art. PROJECT NEED: Required to meet Growth Management Standards and identified in the Parks and Recreation Element of the General Plan. Also needed to meet the Recreation Facility Guidelines. FINANCING: Purpose Design/Admin/lnsp Construction Total Cost = Estimated Cost $950,000 $10,695,000 $11,645,000 Funding Source PFF PFF Poins II Page 57 SOUTHEAST QUADRANT PARKS PROJECTS FUNDING MATRIX FOR SOUTHEAST QUADRANT PARKS PROJECTS PROJ NO. 38372 39251 39252 NEW PROJECT TITLE ALGA NORTE PARK - PHASE I (30 ACRES) ALGA NORTE PARK - PHASE II (POOL) ALGA NORTE PARK - PHASE II (POOL) PROP C FUNDS LEO CARRILLO - HISTORIC BARN (50% GRANT) LEO CARRILLO PARK - EROSION CONTROL LEO CARRILLO PARK - PHASE III LEO CARRILLO PARK - PHASE III FUNDING SOURCE PFF PFF GCC GCC GCC PFF PIL-SE TOTAL BUDGET 12,561,308 6,708,000 11,239,000 395,070 180,000 1,900,000 800,000 FUTURE YEAR BUDGET AMOUNTS YEAR1 2005-2006 6,208,000 5,875,000 180,000 YEAR 2 2006-2007 YEAR 3 2007-2008 YEAR 4 2008-2009 YEARS 2009-2010 YEAR 6-10 2010-2015 BUILDOUT 2015-2020 1,900,000 800,000 Page 58 CAPITAL PROJECT DESCRIPTION SOUTHEAST QUADRANT PARKS - ALGA NORTE PARK - PHASE I PROJECT NAME 38372 PROJECT NO. PROJECT LOCATION MAP: PKUJLCI PROJECT LOCATION: In the Southeast Quadrant, east of El Camino Real and north of and adjacent to future Poinsettia Lane. PROJECT DESCRIPTION: The first phase of this project will include development of approximately 30 acres of the proposed total of 30 acres of park. Amenities include ballfields, basketball courts, picnic areas, restrooms, parking, skate park, dog park, tot lots, etc. Also included is 1 % for Public Art. PROJECT NEED: Required to meet Growth Management Standards and identified in the Parks and Recreation Element of the General Plan. FINANCING: Purpose Studies Design Construction Total Cost = Estimated Cost $25,000 $1,430,000 $11,106,308 $12,561,308 Funding Source PFF PFF PFF Annual Operating Cost = $347,000 ALGANOR2 Page 59 CAPITAL PROJECT DESCRIPTION SOUTHEAST QUADRANT PARKS - ALGA NORTE PARK PHASE II (AQUATICS CENTER) PROJECT NAME 39251 & 39252 PROJECT NO. PROJECT LOCATION MAP: PKUJLUI PROJECT LOCATION: In the Southeast Quadrant, east of El Camino Real and north and adjacent to the future Poinsettia Lane. PROJECT DESCRIPTION: Construction of a 50 meter pool with a pool office facility, showers/restrooms, parking and perimeter landscaping. PROJECT NEED: Alga Norte Park is identified in the Parks and Recreation Element as the site of a future public swimming pool. The existing swim complex is currently past capacity. A new 50 meter pool will assure that adequate swimming facilities will be available for current and future residents. Also includes 1 % for Public Art. FINANCING: Purpose Design Construction Construction Total Cost = Estimated Cost $650,000 $6,058,000 $11,239,000 $17,947,000 Funding Source PFF PFF GCC (Prop C) Annual Operating Cost = $453,000 ALGANOR1 Page 60 o o CAPITAL PROJECT DESCRIPTION SOUTHEAST QUADRANT PARKS - CARRILLO RANCH PHASE III BARN/THEATER PROJECT NAME O NONE PROJECT NO. PROJECT LOCATION MAP: v\ i/c vv "^>i5^ PROJECTX "V? //>x\SITE^\///<r^ / / o n3 =3•< •< o o•TJ 1J o r~r.•^ >. ^f\ ^<f xv> ^ C\ // Pf M \Y,-- /f^V,j^ff^OX^^^%H/^ ^-^ ~^° ..3) O\ \\ ^P ^^S=3I^~^^-^. s2 n n \\ \\\ j^ rrx ^Sf^W— ^w x\, i i,' > c \v. ^e-.v^ x-?'lf^,(. \\ PROJECT LOCATION: Within Carrillo Ranch Park. PROJECT DESCRIPTION: Construction of the "Barn/Theater" portion of future Phase III of Carrillo Ranch. Includes foundation, roof, and wall stabilization and miscellaneous other renovations. PROJECT NEED: The Carrillo Ranch Master Plan calls for the renovation and adoptive reuse of the barn into a theater for visitor orientation presentations, showing old Leo Carrillo films, and various educational purposes. The project will also provide revenue generating opportunities as it can be rented as a meeting facility. FINANCING: Purpose Design Construction Administration Total Cost = Estimated Cost $66,054 $307,003 $22,018 $395,075 Funding Source GCC GCC GCC CarrilloBarn Page 61 CAPITAL PROJECT DESCRIPTION SOUTHEAST QUADRANT PARKS - CARRILLO RANCH EROSION REPAIR PROJECT NAME NONE PROJECT NO. PROJECT LOCATION MAP: a PROJECTX V SITE X ^ PROJECT LOCATION: Carrillo Ranch Park. PROJECT DESCRIPTION: Correct erosion problems in select decomposed granite paving areas of the recently completed Carrillo Ranch Phase II project, including adding drainage structures and stabilization binders. PROJECT NEED: Certain areas of decomposed granite paving have incurred severe erosion during recent rain storms. Sediment from erosion has caused an unsafe park condition resulting in park closures, continues to require expensive maintenance, and may pose sedimentation problems in the two creeks that border the park. FINANCING: Purpose Design Construction Admin/Inspection Total Cost = Estimated Cost $5,000 $169,400 $5,600 $180,000 Funding Source GCC GCC GCC CarrilloErosion Page 62 0 O CAPITAL PROJECT DESCRIPTION SOUTHEAST QUADRANT PARKS - LEO CARRILLO PARK - PHASE III PROJECT NAME O NONE PROJECT NO. PROJECT LOCATION MAP:PROJECT LOCATION: In the Southeast Quadrant, approximately one mile south of Palomar Airport Road adjacent to the future extension of Melrose Drive and future Poinsettia Lane. PROJECT DESCRIPTION: Development of historical ranch into a community park. Project includes completion of remainder of Master Plan (not completed in Phase II). Project includes renovation of additional buildings, construction of additional restrooms, arboretum area, additional landscaping, etc. PROJECT NEED: Required to meet Growth Management Standards and identified in the Parks and Recreation Element of the General Plan. FINANCING: Purpose Design/Construction Design/Construction Total Cost = Estimated Cost $1,900,000 $800,000 $2,700,000 Funding Source PFF PIL-SE LEOCRIII.doc Page 63 DRAINAGE PROJECTS DRAINAGE PROJECTS FUNDING MATRIX FOR DRAINAGE PROJECTS PROJ NO. 33381 38041 36241 36363 36363 NEW 36225 39341 NEW 39051 39052 NEW 38721 36811 PROJECT TITLE AGUA HEDIONDA CHANNEL (PLDA "B") AVIARA PARKWAY STORM DRAIN REIMBURSEMENT (PLDA "C") CARLSBAD BLVD STORM DRAIN REPLACEMENT COLLEGE BLVD. BRIDGE FACILITY BL (REIMB./PLDA "B") COLLEGE BLVD/CANNON RD (BASIN BJB - REIMB./PLDA "B") (FEMA + PLD) COLLEGE BLVD/CANNON RD (BJ AND CALAVERA CR. CHANNEL) CYNTHIA LANE STORM DRAIN FARADAY/MELROSE DRAINAGE FACILITIES (PLDA"B") GABIANO LANE STORM DRAIN MODIFICATION HIGHLAND DRIVE - BETWEEN PINE & BASSWOOD HIGHLAND DRIVE STORM DRAIN HIGHLAND DRIVE STORM DRAIN LA COSTA AVE STORM DRAIN REPLACEMENT MASTER PLAN UPDATE MISCELLANEOUS MASTER DRAINAGE FACILITIES MISCELLANEOUS ROAD SUBDRAINS PARK DRIVE AND TAMARACK AVENUE STORM DRAIN (PLDA "B") TAMARACK AND ECR STORM DRAIN AND SILT. BASIN (REIMB./PLDA "B") FUNDING SOURCE PLD PLD IRF PLD PLD PLD IRF PLD GAS TAX GCC PLD GCC IRF PLD PLD GAS TAX PLD PLD TOTAL BUDGET 1,260,500 290,000 80,000 1,783,000 830,910 2,778,833 100,000 300,000 35,000 240,000 450,600 199,000 492,150 454,933 10,936,000 485,000 500,000 1,279,000 FUTURE YEAR BUDGET AMOUNTS YEAR1 2005-2006 100,000 43,200 492,150 475,000 YEAR 2 2006-2007 196,800 YEAR 3 2007-2008 YEAR 4 2008-2009 YEARS 2009-2010 YEAR 6-10 2010-2015 1,783,000 500,000 BUILDOUT 2015-2020 10,936,000 1,279,000 Page 64 CAPITAL PROJECT DESCRIPTION DRAINAGE PROJECTS - AGUA HEDIONDA CHANNEL IMPROVEMENTS PROJECT NAME 33381 PROJECT NO. PROJECT LOCATION MAP:PROJECT LOCATION: Along the Agua Hedionda Creek Channel from the downstream edge of the Cannon Road bridge to approximately 3,100 feet upstream of the El Camino Real bridge. PROJECT DESCRIPTION: The proposed work includes dredging approximately 40,000 cubic yards of accumulated sediment from within the Agua Hedionda channel, widening and improvement of the channel at the confluence of the Agua Hedionda and Calavera Creeks, reconstruction of the bridge piers under El Camino Real to streamline flows and reduce potential blockages, stabilization of the Calavera Creek channel and mitigation work for the impacts associated with the channel improvement project. Further studies will determine the scope of the mitigation work and the construction costs associated with mitigation and construction. The project may also include removal of the weir wall at the confluence of Calavera Creek with Little Encinas Creek and modifications to the outlet structure at Basin BJB. PROJECT NEED: Required by the Drainage Master Plan to mitigate potential flooding impacts to the Rancho Carlsbad Mobile Home Park development. FINANCING: Purpose Studies/Design Total Cost = Estimated Cost $1,260,500 $1,260,500 Funding Source PLDA "B" Fees STORMDR1.doc Page 65 CAPITAL PROJECT DESCRIPTION 38041 DRAINAGE PROJECTS - AVIARA PARKWAY STORM DRAIN REIMBURSEMENT PROJECT NO. PROJECT NAME PROJECT LOCATION MAP: ROJECT PROJECT LOCATION: Along Aviara Parkway from Cobblestone Road to Encinas Creek. PROJECT DESCRIPTION: Reimbursement to developers for the construction of portions of Master Storm Drainage Facilities "C" and CFA. The constructed facility consisted of approximately 526 feet of 72-inch RCP and 1,257 feet of 66-inch RCP. The developer also constructed a portion of Master Storm Drainage Facility "C" consisting of approximately 150 feet of double barreled 8-foot by 8-foot box culvert beneath Aviara Parkway at Encinas Creek. A complete audit of construction costs for eligibility requirements will be undertaken prior to reimbursing the developer from the PLDA fund. The constructed facilities are in excess of the facilities identified in the Master Drainage Plan. Reimbursement will not exceed the value of the improvement costs as estimated in the Master Drainage Plan without first amending the Master Drainage Plan and revising the PLDA fees accordingly. PROJECT NEED: The above described Master Drainage Plan facilities were recently constructed by a developer. Pursuant to the provisions of the Local Drainage Area (PLDA) Fee Program, the developer is eligible to receive reimbursement for the cost of constructing these facilities in excess of the PLDA fees required of the developing project. FINANCING: Purpose Reimbursement Total Cost = Estimated Cost $290,000 $290,000 Funding Source PLDA "C" Avia_drn Page 66 CAPITAL PROJECT DESCRIPTION 36241 DRAINAGE PROJECTS - CARLSBAD BOULEVARD STORM DRAIN REPLACEMENT PROJECT NO PROJECT NAME PROJECT LOCATION MAP:PROJECT LOCATION: From Carlsbad Boulevard to the San Diego Northern Railroad tracks just south of the railroad overcrossing. PROJECT DESCRIPTION: Relocate and replace approximately 350 feet of 18-inch corrugated metal storm drain pipe (CMP) with a reinforced concrete storm drain pipe. Project would include installation of new storm drain inlets and an outlet. PROJECT NEED: The existing CMP has corroded away and drainage water is now undermining the soil column above the pipe. Recently, a sinkhole developed which required extensive maintenance repairs. The pipe crosses private property along a previously vacated street right-of-way. At one point, the pipe runs beneath a private structure built many years ago over the vacated street. Replacing the pipe will reduce the potential of local flooding on Carlsbad Boulevard and/or damage to the structure above the pipe as well as additional maintenance repairs. FINANCING: Purpose Planning/Study Design Construction Total Cost = Estimated Cost $7,000 $20,000 $53,000 $80,000 Funding Source IRF IRF IRF CBSTRMDR Page 67 CAPITAL PROJECT DESCRIPTION DRAINAGE PROJECTS - COLLEGE BOULEVARD BRIDGE FACILITY PROJECT NAME PROJECT NO. PROJECT LOCATION MAP: WKE CAUVERA PROJECT LOCATION: At the College Boulevard crossing of the Agua Hedionda Creek. PROJECT DESCRIPTION: Construction of a bridge structure for the College Boulevard crossing of the Agua Hedionda Creek. PROJECT NEED: The project is needed to protect College Boulevard from flood damage. FINANCING: Purpose Estimated Cost Funding Source Design/Construction $1,783,000 PLDA "B" Total Cost = $1,783,000 Collbrdg Page 68 CAPITAL PROJECT DESCRIPTION 36363 DRAINAGE PROJECTS -COLLEGE BOULEVARD / CANNON ROAD (DRAINAGE BASIN BJB) PROJECT NO. PROJECT NAME PROJECT LOCATION MAP: PROJECT PROJECT LOCATION: Within and adjacent to Calavera Creek located at the northeast corner of the Cannon Road and College Boulevard intersection. PROJECT DESCRIPTION: Construction of a 49 acre-foot drainage retention basin covering approximately 15 acres of land within and adjacent to Calavera Creek located northeast of the College Boulevard and Cannon Road intersection. The project includes construction of a 11-foot by 7-foot reinforced concrete box extending across the College Boulevard and Cannon Road intersection, a 72-inch low flow pipe draining the retention basin, a concrete spillway and rock slope protection. PROJECT NEED: This project is one of a series of projects designed to help reduce flooding along the Agua Hedionda Creek especially within the RCMHP community. The series of projects include the construction of four floodwater retention basins, including Basin BJ, Basin BJB, the Melrose Drive Basin and the Faraday Avenue basin, and the dredging and/or improvement of the Agua Hedionda and Calavera Creek channels. FINANCING: Purpose Reimbursement Reimbursement Total Cost = Estimated Cost $ 291,247 $539,663 $830,910 Funding Source PLDA "B" Fed Grant Basin-BJB Page 69 CAPITAL PROJECT DESCRIPTION DRAINAGE PROJECTS - COLLEGE BOULEVARD / CANNON ROAD (CALAVERA CREEK CHANNEL AND DRAINAGE BASIN BJ) PROJECT NAME 36363 PROJECT NO. PROJECT LOCATION MAP:PROJECT LOCATION: Along Calavera Creek from El Camino Real to future College Boulevard and within the Little Encinas Creek immediately east of the future College Boulevard. PROJECT DESCRIPTION: Construction of a 49 acre-foot drainage retention basin covering approximately 8 acres of land within and adjacent to the Little Encinas Creek located east of the future College Boulevard at the northeast corner of the Rancho Carlsbad Mobile Home Park (RCMHP). Included with the project is a reinforced concrete box culvert under future College Boulevard. Also included is an 84 inch storm drain pipe proposed along the north side of Cannon Road, designed to take overflow drainage from the Calavera Creek. The construction of the retention basin requires relocation of an existing RV storage lot, community garden and maintenance yard owned by the RCMHP property owners association. The proposed site of the relocated facility is north of the RCMHP and south of Cannon Road. PROJECT NEED: This project is one in a series of projects designed to help reduce flooding along the Agua Hedionda and Calavera Creeks primarily within the RCMHP community. The project also eliminates flooding of El Camino Real during a 100-year flood event. The series of projects include the construction of four floodwater retention basins, including Basin BJ, Basin BJB, the Melrose Drive Basin and the Faraday Avenue basin, and the dredging and/or improvement of the Agua Hedionda and Calavera Creek channels. FINANCING: Purpose Total Cost Total Cost = Estimated Cost $2,778,833 $2,778,833 Funding Source PLDA"B" Basin BJ Page 70 CAPITAL PROJECT DESCRIPTION DRAINAGE PROJECTS - CYNTHIA LANE STORM DRAIN PROJECT NAME NONE PROJECT NO PROJECT LOCATION MAP:PROJECT LOCATION: Cynthia Lane PROJECT DESCRIPTION: Replace existing 18" CMP with a new 24" RCP. PROJECT NEED: The current drainage system is old and insufficient to convey peak storm runoff. FINANCING: Purpose Environmental Design Construction Admin/Inspection Total Cost = Estimated Cost $5,000 $25,000 $50,000 $20,000 $100,000 Funding Source IRF IRF IRF IRF CYNTHIA Page 71 CAPITAL PROJECT DESCRIPTION DRAINAGE PROJECTS - FARADAY/MELROSE DRAINAGE FACILITIES PROJECT NAME 36225 PROJECT NO. PROJECT LOCATION MAP: PROJECT PROJECT LOCATION: Within Faraday Avenue at the crossing of the Agua Hedionda Creek tributary draining the raceway properties. PROJECT DESCRIPTION: Construction of a 49 acre foot floodwater retention facility including a reinforced concrete box culvert beneath Faraday Avenue. PROJECT NEED: This project is one of a series of projects designed to help reduce flooding along the Agua Hedionda Creek especially within the RCMHP community. The series of projects include the construction of four floodwater retention basins, including Basin BJ, Basin BJB, the Melrose Drive Basin and the Faraday Avenue basin, and the dredging and/or improvement of the Agua Hedionda and Calavera Creek channels. FINANCING: Purpose Design/Construction Total Cost = Estimated Cost $300,000 $300,000 Funding Source PLDA "B" Farbasin Page 72 o o CAPITAL PROJECT DESCRIPTION DRAINAGE PROJECTS - GABBIANO LANE STORM DRAIN MODIFICATION STUDY PROJECT NAME O 39341 PROJECT NO. PROJECT LOCATION MAP:PROJECT LOCATION: Southerly end of Gabbiano Lane. PROJECT DESCRIPTION: Study the configuration of the public storm drain outlet and develop a revised configuration that will enable the adjacent private desiltation basin to drain entirely. PROJECT NEED: The project will identify a permittable project that will reduce the maintenance cost for both the private and public facilities associated with the storm drain outlet. FINANCING: Purpose Environmental Report Total Cost = Estimated Cost $15,000 $20,000 $35,000 Funding Source Gas Tax Gas Tax Gabbiano Page 73 CAPITAL PROJECT DESCRIPTION NONE DRAINAGE PROJECTS - HIGHLAND DRIVE BETWEEN PINE AVENUE AND BASSWOOD AVENUE PROJECT NO. PROJECT NAME PROJECT LOCATION MAP: PINE AVENUE ALTERNATIVE ALIGNMENT BASSWOOD AVENUE ALTERNATIVE ALIGNMENT PROJECT LOCATION: West side of Highland Drive between Pine Avenue and Basswood Avenue PROJECT DESCRIPTION: Construction of an 18" reinforced concrete storm drain pipe along Highland Drive from a low point at the mid-block between Pine Avenue and Basswood Avenue to a point of discharge into an existing drainage channel on either Pine Avenue or Basswood Avenue. The specific alignment will be determined after further study and analysis of potential alternative storm drain alignments. The project will include construction of catch basin, junction structures and pipe outlet improvements. PROJECT NEED: The project is needed to prevent potential flooding of private property downstream of Highland Drive. FINANCING: Purpose Design Construction Admin/Inspection Total Cost = Estimated Cost $25,000 $196,800 $18,200 $240,000 Funding Source GCC GCC GCC Highland Page 74 CAPITAL PROJECT DESCRIPTION DRAINAGE PROJECTS - HIGHLAND DRIVE STORM DRAIN PROJECT NAME 39051 & 39052 PROJECT NO. PROJECT LOCATION MAP:PROJECT LOCATION: North end of Highland Drive. PROJECT DESCRIPTION: Design and construct a portion of Drainage Master Plan Facility "AC" at the north end of Highland Drive. PROJECT NEED: The existing 24" CMP is undersized and in need of replacement. Master Drainage Plan Facility "AC" requires upsizing to a 36" RCR FINANCING: Purpose Design/Construction Design/Construction Total Cost = Estimated Cost $450,600 $199,000 $649,600 Funding Source PLDA GCC HIGHLDSD Page 75 CAPITAL PROJECT DESCRIPTION DRAINAGE PROJECTS - LA COSTA AVENUE STORM DRAIN REPLACEMENTS PROJECT NAME NONE PROJECT NO. PROJECT LOCATION MAP:PROJECT LOCATION: Various locations on La Costa Avenue east of El Camino Real. PROJECT DESCRIPTION: Replace old corrugated metal storm drains with reinforced concrete pipe at various locations along La Costa Avenue east of El Camino Real. PROJECT NEED: Existing corrugated metal storm drains are in very poor condition and need to be replaced in order to maintain adequate drainage. FINANCING: Purpose Design Construction Admin/Inspection Total Cost = Estimated Cost $50,000 $378,000 $64,150 $492,150 Funding Source IRF IRF IRF LaCostaSD Page 76 CAPITAL PROJECT DESCRIPTION DRAINAGE PROJECTS - MASTER DRAINAGE PLAN UPDATE PROJECT NAME 38721 PROJECT NO. PROJECT LOCATION MAP: VARIOUS LOCATIONS OF THE CITY PROJECT LOCATION: Throughout the City. PROJECT DESCRIPTION: Update the City's Master Drainage Plan (MDP) based on current growth projections, new Federal storm water quality permit requirements, the City's Habitat Management Plan (HMP) and construction and environmental mitigation cost increases. Also included is the cost to prepare and process an environmental impact report for the updated MDP. PROJECT NEED: The MDP update will help identify the need for changes to planned facilities based on the timing of growth projections and NPDES requirements. The City's MDP was last updated in 1994. Since 1994, there have been several changes to the City's growth patterns due to the HMP and HCP that impact growth projections and densities in various areas of the City. This Master Plan is necessary for identifying the facilities needed to meet Growth Management Standards. FINANCING: Purpose Studies/Reports Total Cost = Estimated Cost $454,933 $454,933 Funding Source PLDA DRNG MP Page 77 CAPITAL PROJECT DESCRIPTION DRAINAGE PROJECTS - MISCELLANEOUS MASTER DRAINAGE FACILITIES PROJECT NAME NONE PROJECT NO. PROJECT LOCATION MAP: VARIOUS LOCATIONS THROUGHOUT THE CITY MASTRDRN PROJECT LOCATION: Various locations throughout the City. PROJECT DESCRIPTION: Construction of various major storm drain facilities within the City. The facilities funded through this program are outlined in the Master Drainage and Storm Water Management Plan. PROJECT NEED: Required to meet Growth Management Standards and identified in the Master Drainage and Storm Water Quality Management Plan. FINANCING: Purpose Design/Construction Total Cost = Estimated Cost $10,936,000 $10,936,000 Funding Source PLDA Fees Page 78 CAPITAL PROJECT DESCRIPTION DRAINAGE PROJECTS - MISCELLANEOUS ROAD SUBDRAINS PROJECT NAME 3681 PROJECT NO. PROJECT LOCATION MAP:PROJECT LOCATION: Nine locations throughout Carlsbad: 1. Carlina & Hataca Road 2. Calavo Court 3. Park Drive & Cove 4. Alicante & Corte De La Vista 5. La Costa Avenue & Cadencia 6. Quebrada Circle 7. Linda Lane 8. Avenida Nieve 9. Circulo Adorno PROJECT DESCRIPTION: Preparation of an engineering study report investigating the potential causes and remedies for various surface/subsurface drainage problems occurring at the various street locations listed above. Repairs will be made to the extent funding is available. Additional funding requests will be made after more detailed cost estimates are prepared in the study report. PROJECT NEED: Based upon citizen request and maintenance staff requests. 1. Save maintenance dollars 2. Mitigates hazards from slip and falls 3. Relieve health hazards FINANCING: Purpose Design/Construction Total Cost = Estimated Cost $485,000 $485,000 Funding Source Gas Tax Misc drn Page 79 CAPITAL PROJECT DESCRIPTION DRAINAGE PROJECTS - PARK DRIVE AND TAMARACK AVENUE STORM DRAIN PROJECT NAME NONE PROJECT NO. PROJECT LOCATION MAP:PROJECT LOCATION: Along Park Drive from Monroe Street to Tamarack Avenue and along Tamarack Avenue from Park Drive to James Drive. PROJECT DESCRIPTION: Installation of approximately 2,100 linear feet of 24-inch diameter reinforced concrete storm drain pipe including access holes and other appurtenances. Identified within the Master Drainage Plan as facility "BCA". PROJECT NEED: Required to prevent flooding of properties west of Park Drive and north of Tamarack Avenue. The development of a proposed new subdivision east of Park Drive between Tamarack Avenue and Monroe Street will add the existing drainage and create a greater need for this master planned drainage facility. FINANCING: Purpose Planning/Study Construction Total Cost = Estimated Cost $100,000 $400,000 $500,000 Funding Source PLDA "B" PLDA "B" Park_tam Page 80 CAPITAL PROJECT DESCRIPTION DRAINAGE PROJECTS - TAMARACK AND EL CAMINO REAL STORM DRAIN AND SILTATION BASIN PROJECT NAME NONE PROJECT NO. PROJECT LOCATION MAP:PROJECT LOCATION: At the southeast corner of Tamarack Avenue and El Camino Real. PROJECT DESCRIPTION: Reimbursement for the construction of a 45-inch and 75-inch storm drainage system together with appurtenant inlets, access holes and outlet structures. Project also includes the installation of an approximate 32,000 cubic yard siltation basin. The project facilities are identified as facilities "BF", "BFB" and Basin "BF1". PROJECT NEED: The Robertson Ranch property owners are currently processing a master plan for development of the Robertson Ranch project including the property at the southeast corner of Tamarack Avenue and El Camino Real. As a condition of development, the developer will be required to install the above-described Master Drainage Plan facilities. The cost of the facilities is expected to exceed the drainage fee obligation for the project, thus creating the potential need for reimbursement. FINANCING: Purpose Reimbursement Total Cost = Estimated Cost $1,279,000 $1,279,000 Funding Source PLDA"B"Fees TAMECRSD.doc Page 81 SEWER PROJECTS ENCINA WATER POLLUTION CONTROL FACILITY PROJECTS FUNDING MATRIX FOR ENCINA WATER POLLUTION CONTROL FACILITY PROJECTS PROJ NO. 34892 34112 36681 38071 36701 38851 36661 PROJECT TITLE BUILDING IMPROVEMENTS CAPITAL ACQUISITIONS/REPLACEMENT/REHAB FLOW EQUALIZATION PROJECT PHASE IV EXPANSION - DEBT SERVICE PHASE V EXPANSION PUMP STATION INTERFACES STAFFING/PROF. SERVICES AND MISC. TECHNOLOGY ENHANCEMENT FUNDING SOURCE SEWER REPL SEWER REPL SEWER CONN SEWER CONN SEWER CONN SEWER REPL SEWER REPL SEWER CONN TOTAL BUDGET 3,046,926 10,561,943 2,557,571 9,327,985 11,796,787 30,836 2,508,045 633,717 FUTURE YEAR BUDGET AMOUNTS YEAR1 2005-2006 467,273 936,394 2,804,221 276,403 YEAR 2 2006-2007 442,474 933,944 254,303 YEAR 3 2007-2008 738,974 935,506 150,696 YEAR 4 2008-2009 385,187 937,169 115,385 YEARS 2009-2010 423,803 933,006 117,359 YEAR 6-10 2010-2015 2,732,235 4,651,966 602,971 BUILDOUT 2015-2020 2,831,593 639,030 Page 82 CAPITAL PROJECT DESCRIPTION ENCINA WATER POLLUTION CONTROL FACILITY - BUILDING IMPROVEMENTS PROJECT NAME 34892 PROJECT NO. PROJECT LOCATION MAP: ROJECT PROJECT LOCATION: Encina Water Pollution Control Facility at 6200 Avenida Encinas. PROJECT DESCRIPTION: To construct and/or improve existing building facilities at the Encina Water Pollution Control Facility. Cost represents City's pro-rated share of the building improvements. Building improvements include: • Additional Office • Employee Locker Facilities • Expanded Laboratory Facilities PROJECT NEED: Needed to provide office and laboratory facilities at the Encina Water Pollution Control Facility. FINANCING: Purpose Estimated Cost Funding Source Design/Construction $3,046,926 Sewer Replacement Total Cost = $3,046,926 ENCINA-1 Page 83 CAPITAL PROJECT DESCRIPTION ENCINA WATER POLLUTION CONTROL FACILITY - CAPITAL ACQUISITIONS REPLACEMENT/REHABILITATION PROJECT NAME 34112 PROJECT NO. PROJECT LOCATION MAP:PROJECT LOCATION: Encina Water Pollution Control Facility at 6200 Avenida Encinas. PROJECT DESCRIPTION: Various Capital Improvements. Cost represents City's pro-rated share of the capital acquisitions, replacement, and rehabilitation. PROJECT NEED: To upgrade the existing plant. FINANCING: Purpose Estimated Cost Funding Source Design/Construction $10,561,943 Sewer Replacement Total Cost = $10,561,943 ENCINA-2.doc Page 84 CAPITAL PROJECT DESCRIPTION 36681 ENCINA WATER POLLUTION CONTROL FACILITY - FLOW EQUALIZATION PROJECT PROJECT NO PROJECT NAME PROJECT LOCATION MAP: PROJECT PROJECT LOCATION: South of Palomar Airport Road on the east side of Avenida Encinas. PROJECT DESCRIPTION: Construction of a reservoir/tank to retain flows which exceed the capacity of the ocean outfall line. Retained flows would be released during periods of low flow. The retention reservoir/tank may double as a reclycled water reservoir. PROJECT NEED: Required to meet Growth Management Standards and identified in the Master Plan of Sewage. Construction of the project will eliminate the need for a second ocean outfall line. Cost represents the City's pro-rated share of the Flow Equalization Project. FINANCING: Purpose Studies/Engineering Total Cost = Estimated Cost $2,557,571 $2,557,571 Funding Source Sewer Connection FLOWED Page 85 CAPITAL PROJECT DESCRIPTION NONE ENCINA WATER POLLUTION CONTROL FACILITY - PHASE IV EXPANSION DEBT SERVICE PROJECT NO PROJECT NAME PROJECT LOCATION MAP: 'PROJECT PROJECT LOCATION: South of Palomar Airport Road on the east side of Avenida Encinas. PROJECT DESCRIPTION: Expansion of the Encina Water Pollution Control Facility to increase treatment capacity from 22.5 million gallons per day to 36.0 million gallons per day of raw sewage. Cost includes bond financing and interest costs. PROJECT NEED: Required to meet Growth Management Standards and identified in the Master Plan of Sewage. FINANCING: Purpose Debt Service Total Cost = Estimated Cost Funding Source $9,327,985 Sewer Connection $9,327,985 TREATPLT Page 86 o o CAPITAL PROJECT DESCRIPTION ENCINA WATER POLLUTION CONTROL FACILITY - PHASE V EXPANSION PROJECT NAME O 38071 PROJECT NO. PROJECT LOCATION MAP: PROJECT SITE PROJECT LOCATION: Encina Water Pollution Control Facility at 6200 Avenida Encinas. PROJECT DESCRIPTION: Expand the Encina Water Pollution Control Facility to buildout for the treatment of 45-60 MGD of wastewater. Cost represents City's pro-rated share of the Phase V expansion. PROJECT NEED: To provide for ultimate wastewater treatment capacity of the Carlsbad Sewer District. FINANCING: Purpose Estimated Cost Funding Source Design/Construction $11,796,787 Sewer Connection Total Cost = $11,796,787 EWPCF-V.doc Page 87 CAPITAL PROJECT DESCRIPTION 36701 ENCINA WATER POLLUTION CONTROL FACILITY - PUMP STATION INTERFACES PROJECT NO PROJECT NAME PROJECT LOCATION MAP: RD. PROJECT PROJECT LOCATION: South of Palomar Airport Road on the east side of Avenida Encinas. PROJECT DESCRIPTION: The project consists of a review of the possible methods to develop active monitoring of the various sewer pump stations which pump sewage from outside agencies. Presently, City capacity at Encina is calculated by subtracting other agency flows from the available plant capacity. Development of an active interface to the pump station would provide more accurate and reliable measurement of the City's treatment capacity. PROJECT NEED: Required to assure that Growth Management Standards for sewer treatment capacity will continue to be met. FINANCING: Purpose Construction Total Cost = Estimated Cost Funding Source $30,836 Sewer Replacement $30,836 INTRFACE Page 88 CAPITAL PROJECT DESCRIPTION ENCINA WATER POLLUTION CONTROL FACILITY - STAFFING/PROFESSIONAL SERVICES & MISC. PROJECT NAME 38851 PROJECT NO. PROJECT LOCATION MAP: PROJECT PROJECT LOCATION: Encina Water Pollution Control Facility at 6200 Avenida Encinas. PROJECT DESCRIPTION: The funds for this project are used by the Encina Water Pollution Control Facility to develop and implement its buildout Capital Improvement Program. The cost is Carlsbad's share to cover staff, overhead and hiring consultants to design and develop bid specifications for future capital acquisitions and the replacement / rehabilitation of facilities at the sewer treatment plant. PROJECT NEED: To ensure the efficient and effective operation of Encina Water Pollution Control Facility. FINANCING: Purpose Estimated Cost Funding Source Admin/Professional Serv. $2,508,045 Sewer Replacement Total Cost = $2,508,045 ENCINA-Staffing Page 89 o o CAPITAL PROJECT DESCRIPTION ENCINA WATER POLLUTION CONTROL FACILITY - TECHNOLOGY ENHANCEMENT PROJECT NAME O 36661 PROJECT NO. PROJECT LOCATION MAP:PROJECT LOCATION: South of Palomar Airport Road on the east side of Avenida Encinas. PROJECT DESCRIPTION: Development of a master plan to evaluate new treatment technologies for possible incorporation into the Encina Treatment Plant. PROJECT NEED: New treatment technologies are constantly being developed. This study will help to evaluate whether any of the new technologies can be used in a cost effective manner at the Encina WPCF. Required to assure that Growth Management Standards for sewer treatment capacity will continue to be met. FINANCING: Purpose Master Plan Total Cost = Estimated Cost Funding Source $633,717 Sewer Connection $633,717 TECHPLAN.doc Page 90 SEWER COLLECTION SYSTEM PROJECTS FUNDING MATRIX FOR SEWER COLLECTION SYSTEM PROJECTS PROJ NO. NEW 33221 36224 34951 38731 39511 35371 38741 35381 38091 38101 38751 38401 39271 39522 35831 NEW 34921 38861 39491 38671 39501 PROJECT TITLE AVENIDA ENCINAS GRAVITY SEWER BUENA INTERCEPTOR SEWER IMPROVEMENTS BUENA VISTA LIFT STATION BUENA VISTA LIFT STATION FORCE MAIN CARLSBAD TRUNK SEWER REACHES VCT1A, VCT1B, VCT1C (SBA "A") FARADAY AVENUE - ORION TO MELROSE SEWER (See Streets) FOREST GRAVITY SEWER HOME PLANT - PIPELINE REPLACEMENT HOME PLANT LIFT STATION REHABILITATION LA COSTA MEADOWS SEWER EXTENSION LA GOLONDRIA SEWER EXTENSION NORTH AGUA HEDIONDA INTERCEPTOR - WEST SEGMENT NORTH AGUA HEDIONDA INTERCEPTOR REHAB - EAST SEGMENT NORTH AGUA HEDIONDA TRUNK SEWER REACH NAHT1A NORTH BATIQUITOS INTERCEPTOR REHABILITATION NORTH BATIQUITOS SEWAGE LIFT STATION MODIFICATIONS POINSETTIA LANE SEWER RELOCATION - Reimb POINSETTIA SEWAGE LIFT STATION ODOR/NOISE ABATEMENT SEWER LIFT STATION REPAIRS AND UPGRADES SEWER LINE REFURBISHMENTS/REPLACEMENT SEWER MASTER PLAN/CONNECTION FEE UPDATE SEWER MONITORING PROGRAM SOUTH AGUA HEDIONDA LIFT STATION AND FORCE MAIN TERRAMAR LIFT STATION EMERGENCY GENERATOR VISTA/CARLSBAD INTERCEPTOR AGUA HEDIONDA LIFT STATION (VC12) VISTA/CARLSBAD INTERCEPTOR REACH VC11B VISTA/CARLSBAD INTERCEPTOR REACH VC13 TO VC15 VISTA/CARLSBAD INTERCEPTOR REHAB REACHES 1 AND 2 VISTA/CARLSBAD INTERCEPTOR REPLACEMENT REACH 3 FUNDING SOURCE SEWER REPL SEWER REPL SEWER CONN SEWER CONN SEW BENEF SEWER REPL SEWER REPL SEWER REPL SEWER REPL SEWER REPL SEWER REPL SEWER REPL SEWER REPL SEWER REPL SEWER REPL SEWER REPL SEWER REPL SEWER REPL SEWER REPL SEWER REPL SEWER REPL SEWER CONN SEW BENEF SEWER REPL SEWER CONN SEWER CONN SEWER CONN SEWER REPL SEWER CONN TOTAL BUDGET 266,963 2,340,000 632,132 1,376,800 503,600 110,200 900,000 440,000 650,000 283,000 654,000 4,177,750 620,000 1,781,220 1,199,000 607,000 400,000 283,800 1,360,380 5,644,600 354,200 330,000 8,827,415 198,000 8,775,000 3,549,000 13,000,000 830,975 2,570,000 FUTURE YEAR BUDGET AMOUNTS YEAR1 2005-2006 460,000 160,000 654,000 547,750 99,000 330,000 22,000 25,000 625,000 1,300,000 78,900 YEAR 2 2006-2007 266,963 1,880,000 650,000 73,000 114,220 243,800 330,000 22,000 173,000 100,640 11,200,000 70,000 YEAR 3 2007-2008 100,000 1,667,000 80,000 330,000 22,000 7,555,000 500,000 YEAR 4 2008-2009 403,600 100,000 330,000 22,000 2,000,000 YEARS 2009-2010 100,000 330,000 22,000 YEAR 6-10 2010-2015 500,000 1,650,000 354,200 110,000 BUILDOUT 2015-2020 1,376,800 1,744,600 110,000 Page 91 CAPITAL PROJECT DESCRIPTION SEWER COLLECTION SYSTEM - AVENIDA ENCINAS GRAVITY SEWER PROJECT NAME 35811 PROJECT NO. PROJECT LOCATION MAP: PROJECT AREA PROJECT LOCATION: Along north side of Lanakai Mobile Home Park. PROJECT DESCRIPTION: Replace approximately 1,000 feet of 8" gravity sewer. PROJECT NEED: The existing forcemain releases unacceptable levels of hydroden sulfide gas resulting in numerous odor complaints and deterioration of the gravity sewer system. FINANCING: Purpose Design/Admin/lnsp Construction Total Cost = Estimated Cost Funding Source $61,250 $205,713 $266,963 Sewer Replacement Sewer Replacement Avencsew Page 92 CAPITAL PROJECT DESCRIPTION NONE SEWER COLLECTION SYSTEM - BUENA INTERCEPTOR SEWER IMPROVEMENTS PROJECT NO PROJECT NAME PROJECT LOCATION MAP: PROJECT (BUENA INTERCEPTOR) PROJECT LOCATION: Buena Interceptor Sewer from El Camino Real to the Encina Wastewater Treatment Plant. PROJECT DESCRIPTION: The Buena Interceptor Sewer conveys wastewater for the cities of Carlsbad and Vista. The existing system capacity is inadequate for projected future flows. The project will be mitigated with an alignment and capacity studies with an alternatives analysis. PROJECT NEED: Required to meet future sewer drainage basin flows. Also required pursuant to the Carlsbad/Buena Sanitation Agreement. FINANCING: Purpose Studies Design Environmental Construction Admin/Inspection Total Cost = Estimated Cost Funding Source $100,000 $104,000 $80,000 $1,800,000 $256,000 $2,340,000 Sewer Replacement Sewer Replacement Sewer Replacement Sewer Replacement Sewer Replacement BUENA INT Page 93 CAPITAL PROJECT DESCRIPTION 33221 SEWER COLLECTION SYSTEM - BUENA VISTA LIFT STATION & PUMP ADDITION PROJECT NO PROJECT NAME PROJECT LOCATION MAP:PROJECT LOCATION: Adjacent to the east side of Jefferson Street just south of Buena Vista Creek. PROJECT DESCRIPTION: Upgrade and expand the lift station facility to a capacity of 15.5 million gallons per day (MGD). Improvements include revision to building to add a second floor, new control systems, new back-up generator and the addition of one new pump. Project costs will be shared with the City of Vista. The below stated cost estimate is Carlsbad's share of the total project cost. PROJECT NEED: Needed to meet future demand. FINANCING: Purpose Estimated Cost Funding Source Design/Construction $632,132 Sewer Connect. Fees Total Cost = $632,132 BUENASTA Page 94 CAPITAL PROJECT DESCRIPTION SEWER COLLECTION SYSTEM - BUENA VISTA LIFT STATION FORCE MAIN (VC-4) PROJECT NAME NONE PROJECT NO. PROJECT LOCATION MAP:PROJECT LOCATION: Along the south shore of the Buena Vista Lagoon between the Buena Vista Lift Station and 1-5. PROJECT DESCRIPTION: Replace existing 16" pipeline with 24" pipeline to provide dual 24" force mains. PROJECT NEED: Increase capacity of sewer force main system to accommodate future sewer generation. FINANCING: Purpose Design Environmental Construction Admin/Inspection Total Cost = Estimated Cost Funding Source $75,000 $125,000 $1,076,800 $100,000 $1,376,800 Sewer Connection Fees Sewer Connection Fees Sewer Connection Fees Sewer Connection Fees Buenlift Page 95 CAPITAL PROJECT DESCRIPTION NONE SEWER COLLECTION SYSTEM - CARLSBAD TRUNK SEWER REACHES VCT1A. VCT1B. VCT1C PROJECT NAME PROJECT NO. PROJECT LOCATION MAP:PROJECT LOCATION: From Vancouver Street and Simsbury Court within Calavera Hills north to the Vista Carlsbad Trunkline located adjacent to Highway 78. PROJECT DESCRIPTION: Construct 1,000 feet of 8-inch diameter sewer, 2,000 feet of 10-inch diameter sewer, and 3,000 feet of 12-inch diameter sewer. PROJECT NEED: As Calavera Hills developed, several temporary sewage lift stations were constructed due to a lack of existing facilities downstream of the project sites. At the time, it was anticipated that the downstream properties would develop in a timely fashion negating any need for long-term maintenance of the temporary lift stations. The two listed stations are aging and in need of increased repair and maintenance. In lieu of expending the additional funds to upgrade temporary stations, staff is proposing completing the extension of the gravity lines from the stations to the existing Vista Carlsbad Trunk Line sewer. The lift stations would then be abandoned and removed. FINANCING: Purpose Estimated Cost Funding Source Land Acquisition Design Construction Total Cost = $20,000 $80,000 $403,600 $503,600 Sewer Benefit Zone Fee Sewer Benefit Zone Fee Sewer Benefit Zone Fee VCT1ABC Page 96 CAPITAL PROJECT DESCRIPTION SEWER COLLECTION SYSTEM - FOREST GRAVITY SEWER PROJECT NAME 34951 PROJECT NO. PROJECT LOCATION MAP: SEWER PROJECT LOCATION: Along Forest Avenue at Highland Drive. PROJECT DESCRIPTION: Abandon sewage lift station and construct gravity sewer. PROJECT NEED: Existing lift station does not meet current electrical and ventilation safety requirements, and wet well and mechanical equipment need replacement. Sewer pipeline eliminates need for upgrade of facility. FINANCING: Purpose Design Construction Admin/Inspection Total Cost = Estimated Cost Funding Source $100,000 $700,000 $100,000 $900,000 Sewer Replacement Sewer Replacement Sewer Replacement Forststa Page 97 CAPITAL PROJECT DESCRIPTION SEWER COLLECTION SYSTEM - HOME PLANT LIFT STATION PROJECT NAME 38731 PROJECT NO. PROJECT LOCATION MAP: PACIFIC OCEAN PROJECT LOCATION: Home Plant Lift Station near Carlsbad Boulevard and northern City limits. PROJECT DESCRIPTION: Replace pumps, upgrade wetwell and manifold piping, relocate wetwell ventilation system, reconstruct influent sewer manhole, and replace 260 feet of 15-inch gravity sewer pipeline. PROJECT NEED: Field review shows that sand accumulating in the wet well is due to undersized pumps. Installing larger pumps, replacing existing pipeline, and completing the other upgrades will reduce the maintenance costs at the pump station. FINANCING: Purpose Design Construction Admin/Inspection Total Cost = Estimated Cost $50,000 $1,000,000 $40,000 $1,090,000 Funding Source Sewer Replacement Sewer Replacement Sewer Replacement Homeplnt Page 98 CAPITAL PROJECT DESCRIPTION SEWER COLLECTION SYSTEM - LA COSTA MEADOWS SEWER EXTENSION PROJECT NAME 39511 PROJECT NO. PROJECT LOCATION MAP:PROJECT LOCATION: In La Costa from the end of Chorlito Street to El Fuerte Street. PROJECT DESCRIPTION: Removal of the La Costa Meadows Lift Station and extension of an eight-inch gravity sewer approximately 600 feet to the new gravity sewer constructed in El Fuerte Street by the Rancho Carrillo project developer. PROJECT NEED: The La Costa Meadows Lift Station was constructed to temporarily divert sewage flows into existing Leucadia County Water District (LCWD) facilities. The diversion was required due to a lack of City sewer facilities located downstream of the La Costa Meadows project within the Rancho Carrillo Valley. The "diversion" agreement between the City and LCWD required the abandonment of the lift station and connection to City sewer facilities when the downstream properties were developed and new sewer facilities extended up El Fuerte Street. The needed downstream sewer collection facilities were recently constructed as part of the Rancho Carrillo project. FINANCING: Purpose Design Construction Admin/Inspection Total Cost = Estimated Cost Funding Source $25,000 $210,000 $35,000 $283,000 Sewer Replacement Sewer Replacement Sewer Replacement Lcmeadow Page 99 CAPITAL PROJECT DESCRIPTION SEWER COLLECTION SYSTEM - LA GOLONDRINA SEWER EXTENSION PROJECT NAME NONE PROJECT NO. PROJECT LOCATION MAP:PROJECT LOCATION: In La Costa from the end of La Golondrina Street north of Poinsettia Lane. PROJECT DESCRIPTION: Removal of the La Golondrina Lift Station and extension of an eight-inch diameter gravity sewer approximately 1,000 feet to the new gravity sewer constructed in Poinsettia Lane by the Rancho Carrillo project developer. PROJECT NEED: The La Costa Golondrina Lift Station was constructed to temporarily divert sewage flows into existing Leucadia County Water District (LCWD) facilities. The diversion was required due to a lack of City sewer facilities located downstream of the Ponderosa Homes project within the Rancho Carrillo Valley. The "diversion" agreement between City and LCWD require the abandonment of the lift station and connection to City sewer facilities when the downstream properties were developed and new sewer facilities extended up the future Poinsettia Lane. The needed downstream sewer collection facilities were recently completed as part of the Rancho Carrillo project. FINANCING: Purpose Planning/Study Land Acquisition Environmental Design Construction Admin/Inspection Total Cost = Estimated Cost Funding Source $10,000 $5,000 $25,000 $60,000 $489,000 $65,000 $654,000 Sewer Replacement Sewer Replacement Sewer Replacement Sewer Replacement Sewer Replacement Sewer Replacement La_golon Page 100 CAPITAL PROJECT DESCRIPTION SEWER COLLECTION SYSTEM - NORTH AGUA HEDIONDA INTERCEPTOR REHABILITATION - WEST SEGMENT COVE DRIVE TO HOOVER STREET PROJECT NAME 35371 PROJECT NO. PROJECT LOCATION MAP:PROJECT LOCATION: North bank of Agua Hedionda Lagoon and Creek, from Cove Drive to Hoover Street. PROJECT DESCRIPTION: • Design and construct access road and shoreline protection wall to facilitate gravity sewer maintenance from Cove Drive to Hoover Street. • Design and construct erosion protection for access road and existing gravity sewer where needed. • Replace 700 linear feet of 24-inch diameter sewerline. • Replace/rehabilitate 19 access holes. • Conduct environmental survey and prepare Environmental Impact Report necessary to obtain permits. • Design and construct mitigation site. PROJECT NEED: Implementation of the project will avoid accidental sewage spill to the lagoon and creek, reduce inflow to the sewer, and allow for maintenance vehicles to access the sewer. FINANCING: Purpose Study Environmental Property Acquisition Design Construction Estimated Cost $24,599 $829,808 $45,000 $199,916 $3,078,427 Funding Source Sewer Replacement Sewer Replacement Sewer Replacement Sewer Replacement Sewer Replacement Total Cost = $4,177,750 Annual Operating Cost = $5,000 NAI west Page 101 CAPITAL PROJECT DESCRIPTION SEWER COLLECTION SYSTEM - NORTH AGUA HEDIONDA INTERCEPTOR REHABILITATION - EAST SEGMENT EL CAMINO REAL TO KELLY DRIVE PROJECT NAME 38741 PROJECT NO. PROJECT LOCATION MAP:PROJECT LOCATION: North bank of Agua Hedionda Lagoon and Creek, from El Camino Real and Cannon Road intersection to the Kelly Drive/Cove Drive intersection. PROJECT DESCRIPTION: • Replace/rehabilitate 21 access holes. • Conduct environmental survey and prepare documents necessary to obtain permits. PROJECT NEED: Implementation of the project will avoid accidental sewage spill to the lagoon and creek, and reduce inflow to the sewer. FINANCING: Purpose Environmental/Design Construction Total Cost = Estimated Cost $9,000 $611,000 $620,000 Funding Source Sewer Replacement Sewer Replacement Naguaecr Page 102 CAPITAL PROJECT DESCRIPTION NONE SEWER COLLECTION SYSTEM - NORTH AGUA HEDIONDA TRUNK SEWER REACH NAHT1A PROJECT NO PROJECT NAME PROJECT LOCATION MAP:PROJECT LOCATION: Along the north side of Tamarack Avenue from El Camino Real to Calavera Hills Treatment Plant. PROJECT DESCRIPTION: Remove existing forcemain and construct 5,000 feet of 8-inch diameter gravity sewer pipeline. PROJECT NEED: When the Calavera Hills Sewer Treatment Plant was initially constructed, there was no provision for extending a gravity sewer line downstream of the plant. When the decision was made not to activate the plant, the sewer mains discharging into the plant site were connected to force main pipe which was originally intended to carry flow up to the plant from projects located downstream of the plant. The existing force main is not sloped properly to handle gravity flow and lacks the necessary access holes for proper maintenance. Removal of the existing force main and construction of a new gravity line will complete this portion of the Sewer Master Plan. FINANCING: Purpose Planning/Study Design Construction Admin/Inspection Total Cost = Estimated Cost Funding Source $58,000 $100,000 $1,523,220 $100,000 $1,781,220 Sewer Replacement Sewer Replacement Sewer Replacement Sewer Replacement NAHT1A Page 103 CAPITAL PROJECT DESCRIPTION SEWER COLLECTION SYSTEM - NORTH BATIQUITOS INTERCEPTOR REHABILITATION PROJECT NAME 35381 PROJECT NO. PROJECT LOCATION MAP:PROJECT LOCATION: North side of Batiquitos Lagoon from El Camino Real west to North Batiquitos Lift Station. PROJECT DESCRIPTION: During high rainfall periods, the Batiquitos Lagoon level rises to flood above the existing access road and access hole covers. The project will design a new access road to the sewer and raise access hole covers to a higher elevation where required. PROJECT NEED: To avoid accidental sewage spill, reduce inflow to the sewer, and allow for maintenance vehicles to access the sewer. FINANCING: Purpose Estimated Cost Funding Source Design Environmental Land Acquisition Construction Admin/Inspection Total Cost = $270,000 $80,000 $30,000 $719,000 $100,000 $1,199,000 Sewer Replacement Sewer Replacement Sewer Replacement Sewer Replacement Sewer Replacement Nbatint Page 104 CAPITAL PROJECT DESCRIPTION 38091 SEWER COLLECTION SYSTEM - NORTH BATIQUITOS SEWAGE LIFT STATION MODIFICATIONS PROJECT NO PROJECT NAME PROJECT LOCATION MAP: PROJECT SITE PROJECT LOCATION: End of Gabbiano Lane. PROJECT DESCRIPTION: Replace miscellaneous equipment damaged by corrosion. Provide structural modifications to dry well and wet well. Modify mechanical and electrical systems as needed to eliminate failures. Provide color study and necessary HVAC and odor control modifications. PROJECT NEED: Existing structure does not allow wet well to be cleaned out. Existing structure needs openings to allow lift station pumps to be removed. Existing electrical system needs to be modified to stop pumps from locking out unnecessarily. FINANCING: Purpose Design Construction Admin/Inspection Total Cost = Estimated Cost Funding Source $124,880 $429,120 $53,000 $607,000 Sewer Replacement Sewer Replacement Sewer Replacement Northbat Page 105 CAPITAL PROJECT DESCRIPTION SEWER COLLECTION SYSTEM - POINSETTIA LANE SEWER RELOCATION PROJECT NAME 38101 PROJECT NO. PROJECT LOCATION MAP: PACIFIC OCEAN PROJECT LOCATION: Poinsettia Lane near railroad. PROJECT DESCRIPTION: Relocate 2,000 feet of 21" sewer. PROJECT NEED: The existing sewer facilities beneath the Poinsettia Lane bridge crossing the SDNRR are inaccessible and are difficult to maintain properly. The proposed widening of the Poinsettia Lane bridge improvements will exacerbate the problem. The proposed relocation project will be timed to coincide with the development of the adjacent Poinsettia Properties project to reduce costs and eliminate the need to pay for the necessary easements. FINANCING: Purpose Design Construction Total Cost = Estimated Cost Funding Source $100,000 $300,000 $400,000 Sewer Replacement Sewer Replacement Poin sew Page 106 CAPITAL PROJECT DESCRIPTION 38751 SEWER COLLECTION SYSTEM - POINSETTIA SEWAGE LIFT STATION ODOR AND NOISE ABATEMENT PROJECT NO. PROJECT NAME PROJECT LOCATION MAP:PROJECT LOCATION: 2425 Poinsettia Lane - Poinsettia Sewage Lift Station. PROJECT DESCRIPTION: Installation of an activated carbon adsorption odor control system, including ducting, to treat foul air from the lift station wetwell to reduce corrosion and control odor emissions, and sound enclosures for outdoor fans. PROJECT NEED: The existing lift station emits odors that can reach future developments in close proximity to the lift station. In addition, uncovered supply and exhaust fans generate noise that reach or exceed 60 dBa at the fenceline. Control of the odors and reduction of noise will promote "good neighbor" policy and a higher level of service to adjacent residents. FINANCING: Purpose Environmental Design Construction Admin/Inspection Total Cost = Estimated Cost $6,000 $15,700 $217,100 $45,000 Funding Source Sewer Replacement Sewer Replacement Sewer Replacement Sewer Replacement $283,800 Annual Operating Cost = $11,000 Poinlift Page 107 CAPITAL PROJECT DESCRIPTION 38401 SEWER COLLECTION SYSTEM - SEWER LIFT STATION - MISCELLANEOUS REPAIRS & UPGRADES PROJECT NO. PROJECT NAME PROJECT LOCATION MAP: BUENAVISTA PROJECT LOCATION: Villas, Terramar and Gateshead sewer lift stations. PROJECT DESCRIPTION: Repair and upgrade various sewer lift stations throughout the City. Repairs include replacing existing malfunctioning alarm dialers at the Home Plant and Villas Sewer Lift Stations; replacing old pumps at the Terramar, Villas and Gateshead Sewer Lift Stations; replacing existing gas monitoring units, and the wet well lining at the Villas Sewer Lift Station. PROJECT NEED: These projects are needed to properly maintain the existing sewer lift stations and prevent potential sewage spills. Many of the existing stations are 15 years or older and require periodic upgrades and/or replacement of pumps and electrical systems to increased maintenance costs. FINANCING: Purpose Design Construction Admin/Inspection Total Cost = Estimated Cost Funding Source $40,000 $1,275,380 $45,000 $1,360,380 Sewer Replacement Sewer Replacement Sewer Replacement Sewerlft Page 108 CAPITAL PROJECT DESCRIPTION SEWER COLLECTION SYSTEM - SEWER LINE REFURBISHMENT/REPLACEMENT PROJECT NAME 39271 PROJECT NO. PROJECT LOCATION MAP: VARIOUS LOCATIONS THROUGHOUT THE CITY PROJECT LOCATION: Various locations within the City sewer limits. PROJECT DESCRIPTION: Clean and refurbish existing sewer lines older than 30 years or replace if not able to refurbish. The sewer lines needing repair will be determined by yearly TV inspection. PROJECT NEED: Maintain system in good condition to avoid major problems. FINANCING: Purpose Estimated Cost Funding Source Design/Construction $5,644,600 Sewer Replacement Total Cost = $5,644,600 SEWERLNE Page 109 CAPITAL PROJECT DESCRIPTION NONE SEWER COLLECTION SYSTEM - MASTER PLAN/CONNECTION FEE UPDATE PROJECT NO. PROJECT NAME PROJECT LOCATION MAP: LOCATIONS THROUGHOUT THE CITY Mstrplan PROJECT LOCATION: Throughout the City. PROJECT DESCRIPTION: Update the City's 2003 Sewer Master Plan based on anticipated growth projections. PROJECT NEED: The Master Plan update will help identify the need for changes to planned facilities based on the timing of growth projections and Growth Management Standards. FINANCING: Purpose Report/Admin Total Cost = Estimated Cost Funding Source $354,200 Sewer Replacement $354,200 Page 110 CAPITAL PROJECT DESCRIPTION SEWER COLLECTION SYSTEM - SEWER MONITORING PROGRAM PROJECT NAME 39522 PROJECT NO. PROJECT LOCATION MAP: N/A PROJECT LOCATION: Citywide within the City's sewer service area. PROJECT DESCRIPTION: Monitor sewer flows and remaining capacities in lines and pump stations within the Carlsbad sewer service area. Perform sewer flow measurements when required. Update Sewer Master Plan and review adequacy of sewer fees as required. PROJECT NEED: To ensure that sewer flows do not exceed line capacity and to ensure timely upgrades of sewer systems in conformance with the Growth Management Standards. FINANCING: Purpose Monitoring Total Cost = Estimated Cost Funding Source $330,000 Sewer Connection $330,000 SEWERMON Page 111 CAPITAL PROJECT DESCRIPTION SEWER COLLECTION SYSTEM - SOUTH AGUA HEDIONDA LIFT STATION AND FORCE MAIN PROJECT NAME 35831 & 38281 PROJECT NO. PROJECT LOCATION MAP:PROJECT LOCATION: Along Cannon Road from Armada Drive to El Camino Real. PROJECT DESCRIPTION: Construct 350 HP sewage lift station and force main in Cannon Road Reaches SAH1,SAH2,andSAH3. PROJECT NEED: To provide sewer service to those areas generally tributary to the south side of Agua Hedionda Lagoon. FINANCING: Purpose Estimated Cost Funding Source Planning, Permitting & Design $1,500,000 Sewer Benefit Area Fee Construction $7,327,415 Sewer Benefit Area Fee Total Cost = $8,827,415 Annual Operating Cost = $435,000 SOAGPHII Page 112 CAPITAL PROJECT DESCRIPTION NONE SEWER COLLECTION SYSTEM - TERRAMAR LIFT STATION EMERGENCY GENERATOR PROJECT NO PROJECT NAME PROJECT LOCATION MAP: \ SITE TERRAMAR LIFT STATION PROJECT LOCATION: The existing lift station is located approximately 500 feet west of the railroad right-of-way on the north side of Cannon Road. PROJECT DESCRIPTION: Construct approximately 500 linear feet of sewer pipeline from the lift station to the Vista/Carlsbad interceptor or install a standby generator. PROJECT NEED: Currently, the Terramar Lift Station has no redundancy for electric power outages. Staff responds by bringing a portable generator to the site. Installation of an emergency overflow pipe system or emergency generator will diminish risk of sewer spills. FINANCING: Purpose Design/Studies Construction Admin/Inspection Total Cost = Estimated Cost $20,200 $154,000 $24,000 $198,000 Funding Source Sewer Replacement Sewer Replacement Sewer Replacement TERRAMAR Page 113 CAPITAL PROJECT DESCRIPTION SEWER COLLECTION SYSTEM - VISTA/CARLSBAD INTERCEPTOR AGUA HEDIONDA LIFT STATION (VC 12) PROJECT NAME 34921 PROJECT NO. PROJECT LOCATION MAP:PROJECT LOCATION: On the south shore of Agua Hedionda Lagoon adjacent to the east side of the railroad tracks. PROJECT DESCRIPTION: Upgrade existing pump station to increase capacity for buildout conditions. Replace existing pumps with larger capacity pumps and associated appurtenances. Carlsbad shares the total cost of the project with the City of Vista at a 50/50% share. PROJECT NEED: Required to handle sewage flows for buildout population. FINANCING: Purpose Environmental Design Construction Estimated Cost Funding Source $508,800 $610,600 $7,655,600 Sewer Connection Fee Sewer Connection Fee Sewer Connection Fee Total Cost = $8,775,000 Includes Vista's share of costs. Annual Operating Cost = $149,000 Agualift Page 114 CAPITAL PROJECT DESCRIPTION 38861 SEWER COLLECTION SYSTEM - VISTA/CARLSBAD INTERCEPTOR SEWER REACH VC11B PROJECT NO PROJECT NAME PROJECT LOCATION MAP: FACILITY PROJECT LOCATION: Along NCTD railroad right-of-way from Olive Avenue south across Agua Hedionda Lagoon to the Agua Hedionda Lift Station. PROJECT DESCRIPTION: Replace existing Vista/Carlsbad Interceptor Sewer Reach VC11B and bridge (wood trestle) with 800 feet of 54-inch pipeline and a new concrete bridge. Project cost is shared with the City of Vista. PROJECT NEED: Required to handle buildout flows by replacing existing pipeline and the wood bridge. FINANCING: Purpose Environmental Design Property Acquisition Construction Estimated Cost Funding Source $100,000 $200,000 $14,000 $3,235,000 $3,549,000 Sewer Connection Fee Sewer Connection Fee Sewer Connection Fee Sewer Connection Fee Total Cost = "Cost includes Vista's share of costs. Annual Operating Cost = $568 SEWVC11B Page 115 CAPITAL PROJECT DESCRIPTION 39491 SEWER COLLECTION SYSTEM - VISTA/CARLSBAD INTERCEPTOR SEWER REACHES VC13 TO VC15 PROJECT NO. PROJECT NAME PROJECT LOCATION MAP: PROJECT POLLUTION CONTROLFACILITY PROJECT LOCATION: From the Agua Hedionda Lift Station south to the Encina Water Pollution Control Facility. PROJECT DESCRIPTION: Replace existing Vista/Carlsbad Interceptor Sewer Reaches VC13 to VC15 with a 54" pipeline. Project cost is shared with the City of Vista. PROJECT NEED: Required to handle buildout flows and deteriorated pipelines. FINANCING: Purpose Estimated Cost Funding Source Design Construction Total Cost = $700,000 Sewer Connection Fees $12,300,000 Sewer Connection Fees $13,000,000 * *Cost includes Vista's share. VC13VC15 Page 116 CAPITAL PROJECT DESCRIPTION SEWER COLLECTION SYSTEM - VISTA/CARLSBAD INTERCEPTOR SEWER REHABILITATION REACHES 1 THRU 3 PROJECT NAME 39501 & 38671 PROJECT NO. PROJECT LOCATION MAP: PROJECT PROJECT LOCATION: Reaches 1, 2 and 3 of the Vista/Carlsbad Interceptor Sewer located south of Highway 78 from Jefferson Street to the City limits. PROJECT DESCRIPTION: Reaches 1, 2 and 3 of the Vista/Carlsbad (V/C) 36" Ductile Iron Interceptor and manholes have corroded significantly. VC1 and 2 will be lined with PVC and manholes will be rehabilitated. VC3 will be completely replaced. V/C interceptor is jointly owned by the City of Vista and the City of Carlsbad. Through a joint City agreement, Carlsbad is responsible for 15% of the cost for maintenance and improvements to Reaches 1, 2 and 3. The City of Vista is responsible for managing projects within these reaches. Costs below reflect the City of Carlsbad's share of project. PROJECT NEED: Increase safety: Pipeline and manholes have been determined to be in poor condition. Risk of pipeline failure and sewage spill in environmentally sensitive area exists. Unmet needs: Manholes are currently unlined. Concrete is exposed to hydrogen sulfide environment. Lining will increase longevity of the manhole. Lining of pipeline will reduce ground water infiltration into the wastewater system. FINANCING: Purpose Design/Construction Construction Estimated Cost Funding Source $830,975 $2,570,000 Sewer Replacement Sewer Connection Total Cost = $3,400,975 * *Cost includes Administration and Inspection costs. VCinterc Page 117 WA TER PROJECTS WATER DISTRIBUTION SYSTEM PROJECTS FUNDING MATRIX FOR WATER DISTRIBUTION SYSTEM PROJECTS PROJ NO. 33762 33761 39541 39321 38421 38921 36631 39551 34461 38441 38431 39111 39121 38161 39131 36223 39031 38211 39041 38231 38221 35311 PROJECT TITLE "D" RESERVOIR - PHASE II "D" RESERVOIR - PHASE II "D" RESERVOIR - BLACK RAIL ROAD IMPROVEMENTS "D" RESERVOIR IMPROVEMENTS AVIARA PARKWAY AT PLUM TREE CALAVERA HILLS WATER BOOSTER STATION STANDBY GENERATOR CANNON ROAD EAST OF EL CAMINO REAL - Reimb CARLSBAD BOULEVARD - SOUTH OF AVENIDA ENCINAS COLLEGE BOULEVARD - CANNON RD TO CARLSBAD VILLAGE DR - Reimb COLLEGE BOULEVARD - CANNON TO BADGER LANE COLLEGE BOULEVARD (ECR TO CANNON ROAD) - Reimb COLLEGE BOULEVARD- MAERKLE RESERVOIR TO AGUA HEDIONDA CREEK CRESTVIEW DRIVE TRANSMISSION MAIN DEMOLITION OF WATER FACILITIES AT PAJAMA DRIVE DESALINATION GROUNDWATER/SEAWATER STUDY EL CAMINO REAL - PALOMAR AIRPORT ROAD SOUTH EL CAMINO REAL BETWEEN COLLEGE AND JACKSPAR EL CAMINO REAL CROSSING AT KELLY DRIVE EL CAMINO REAL TRANSMISSION MAIN - LISA STREET TO KELLY DRIVE EL CAMINO REAL TRANSMISSION MAIN FROM FARADAY TO COUGAR DRIVE EL CAMINO REAL/CARLSBAD VILL DR PIPELINE REPL. EL FUERTE - NORTH OF LOKER - Reimb EL FUERTE - ALGA ROAD TO POINSETTIA LANE - Reimb EL FUERTE - POINSETTIA LANE TO PALOMAR AIRPORT ROAD - Reimb EL FUERTE AND CORINTIA STREET FARADAY AVENUE - ORION TO MELROSE WATERLINE - Reimb (See Streets) FARADAY AVENUE EXTENSION - Reimb FOUSSAT ROAD WELL ABANDONMENT LAKE CALAVERA RESERVOIR IMPROVEMENTS MAERKLE PUMP STATION IMPROVEMENTS MAERKLE PUMP STATION IMPROVEMENTS MAERKLE RESERVOIR STORAGE (TAP #2) MARRON ROAD - PRESSURE REGULATING STATION TO OCEANSIDE MASTER PLAN UPDATE MELROSE DRIVE - PALOMAR AIRPORT ROAD TO FARADAY - Reimb MISCELLANEOUS PIPELINE REPLACEMENT PROJECTS MISCELLANEOUS STORAGE TANK REPAIRS MISCELLANEOUS WATER RESERVOIR FENCING OCEANSIDE INTERTIE UPGRADE FUNDING SOURCE WATER CONN WATER REPL WATER REPL WATER REPL WATER REPL WATER CONN WATER CONN WATER REPL WATER CONN WATER CONN WATER CONN WATER REPL WATER REPL WATER REPL WATER REPL WATER REPL WATER CONN WATER CONN WATER CONN WATER REPL WATER REPL WATER CONN WATER CONN WATER CONN WATER REPL WATER CONN WATER CONN WATER REPL WATER REPL WATER CONN WATER REPL WATER CONN WATER CONN WATER CONN WATER CONN WATER REPL WATER REPL WATER REPL WATER REPL TOTAL BUDGET 5,715,200 1,905,000 182,500 156,000 439,400 448,200 760,800 847,200 1,300,000 714,100 466,000 3,615,000 143,900 60,000 719,260 3,225,000 691,600 104,000 470,000 774,100 65,000 148,750 2,000,000 1,141,000 149,400 97,210 716,800 202,500 3,693,100 747,100 747,100 12,700,300 684,000 47,800 796,300 1,809,800 161,000 120,400 110,700 FUTURE YEAR BUDGET AMOUNTS YEAR1 2005-2006 760,800 495,000 104,000 420,000 64,100 15,000 492,600 400,000 161,000 10,400 YEAR 2 2006-2007 50,000 466,000 360,000 525,500 400,000 YEAR 3 2007-2008 439,400 398,200 714,100 2,760,000 30,000 716,800 796,300 409,800 110,700 YEAR 4 2008-2009 847,200 113,900 149,400 12,700,300 YEARS 2009-2010 YEAR 6-10 2010-2015 5,715,200 1,905,000 719,260 747,100 747,100 47,800 BUILDOUT 2015-2020 691,600 684,000 Page 118 FUNDING MATRIX FOR WATER DISTRIBUTION SYSTEM PROJECTS PROJ NO. 34791 39102 39101 38781 38581 39231 39561 39151 38531 39001 36641 PROJECT TITLE PALOMAR AIRPORT - NORTH OF OWENS PAR/ECR PUMP STATION PAR/ECR PUMP STATION POINSETTIA LANE - EL CAMINO REAL TO SKIMMER CT (Reimb) POINSETTIA LANE - SKIMMER CT TO CASSIA POINSETTIA LANE - SKIMMER CT TO CASSIA POINSETTIA LANE EAST OF BLACK RAIL ROAD 12" POINSETTIA LANE EAST OF BLACK RAIL ROAD 12" PRESSURE REDUCING STATION - SYCAMORE CREEK PRESSURE REGULATING STATION - CANNON AND COLLEGE - Reimb RANCHO CARRILLO OVERSIZING/EXTENSION RANCHO SANTA FE RD PIPELINE REPLACEMENT (See Streets) SAN MARCOS BOULEVARD WEST OF SDCWA TANGLEWOOD PRESSURE REDUCING STATION REPLACEMENT TAP RESERVOIR EXTERIOR PAINTING WATER OPERATIONS WATER PUMP PROJECT WATER SYSTEM INTERTIE CONNECTION FUNDING SOURCE WATER CONN WATER CONN WATER REPL WATER CONN WATER REPL WATER CONN WATER CONN WATER REPL WATER CONN WATER CONN WATER CONN WATER REPL WATER REPL WATER REPL WATER REPL WATER REPL WATER REPL TOTAL BUDGET 150,000 997,350 990,350 224,800 436,100 342,000 205,500 205,400 112,100 250,000 93,700 773,000 3,001,000 332,000 132,700 60,900 439,000 FUTURE YEAR BUDGET AMOUNTS YEAR1 2005-2006 64,100 57,100 3,700 345,000 32,000 12,700 5,900 39,000 YEAR 2 2006-2007 YEAR 3 2007-2008 YEAR 4 2008-2009 YEARS 2009-2010 YEAR 6-10 2010-2015 224,800 436,100 342,000 205,500 205,400 112,100 BUILDOUT 2015-2020 Page 119 CAPITAL PROJECT DESCRIPTION WATER DISTRIBUTION SYSTEM - "D" RESERVOIR PHASE II PROJECT NAME 33761 & 33762 PROJECT NO. PROJECT LOCATION MAP:PROJECT LOCATION: Adjacent to existing "D" Reservoir. PROJECT DESCRIPTION: Construct new 8.5 MG water reservoir to service 375 Zone. PROJECT NEED: Provide additional daily storage within the distribution system for ultimate demands. FINANCING: Purpose Construction Construction Total Cost = Estimated Cost Funding Source $5,715,200 $1,905,000 $7,620,200 Water Connection Water Replacement D Resll Page 120 CAPITAL PROJECT DESCRIPTION 39541 WATER DISTRIBUTION SYSTEM PROJECTS - "D" RESERVOIR - BLACK RAIL ROAD IMPROVEMENTS PROJECT NO PROJECT NAME PROJECT LOCATION MAP: PROJECT PROJECT LOCATION: Black Rail Road segment adjacent to "D" Tank Reservoir. PROJECT DESCRIPTION: Black Rail Road improvements include paving, base, sidewalks, curb and gutter, grading, retaining wall, and undergrounding of existing utilities. PROJECT NEED: The Black Rail Road improvements fronting the "D" Tank Reservoir are required by CUP 03-15. FINANCING: Purpose Design Construction Admin/Inspection Total Cost = Estimated Cost $28,000 $130,000 $24,500 $182,500 Funding Source Water Replacement Water Replacement Water Replacement Blackrail Page 121 CAPITAL PROJECT DESCRIPTION WATER DISTRIBUTION SYSTEM - "D" RESERVOIR IMPROVEMENTS PROJECT NAME 39321 PROJECT NO. PROJECT LOCATION MAP:PROJECT LOCATION: The "D" Reservoir site is located on Black Rail Road south of Poinsettia Lane. PROJECT DESCRIPTION: The "D" Reservoir improvements includes a slurry seal of all of the existing asphalt concrete pavement. PROJECT NEED: Pavement maintenance is required to maintain a safe and smooth driving surface while extending the useful service of the site pavement. FINANCING: Purpose Construction Admin/Design/lnsp Total Cost = Estimated Cost Funding Source $142,500 $13,500 $156,000 Water Replacement Fund Water Replacement Fund D Tanks Page 122 CAPITAL PROJECT DESCRIPTION WATER DISTRIBUTION SYSTEM - AVIARA PARKWAY PROJECT NAME PROJECT LOCATION MAP: PROJECT NO. #19 PROJECT LOCATION: Aviara Parkway at Plum Tree, north to Mariposa Street, then east to Sapphire Drive. PROJECT DESCRIPTION: Construct 3,100 feet of 8-inch watermain. PROJECT NEED: Provide redundant supply to residential development. FINANCING: Estimated Cost Funding SourcePurpose Construction Adm/Design/lnsp Total Cost = $342,400 $97,000 $439,400 Water Replacement Water Replacement Aviara Page 123 CAPITAL PROJECT DESCRIPTION WATER DISTRIBUTION SYSTEM - CALAVERA HILLS WATER BOOSTER STATION STANDBY GENERATOR PROJECT NAME 38421 PROJECT LOCATION MAP: CITY OF OCEANSIDE -WOFWSBSD LAKE CALAVERA PROJECT SITE PROJECT NO. #37 PROJECT LOCATION: College Boulevard at Carlsbad Village Drive. PROJECT DESCRIPTION: Furnish and install standby generator and generator building at Calavera Hills Booster Pump Station. PROJECT NEED: The existing booster station at this location does not have backup power. If an electrical power outage occurs, the pump station will not operate. The addition of a permanent generator at this facility will increase reliability in accordance with Council goals. FINANCING: Purpose Design/Adm/lnsp Construction Total Cost = Estimated Cost Funding Source $105,000 $343,200 $448,200 Water Connection Water Connection Calhills Page 124 o CAPITAL PROJECT DESCRIPTION WATER DISTRIBUTION SYSTEM - CANNON ROAD EAST OF EL CAMINO REAL PROJECT NAME O PROJECT LOCATION MAP: PROJECT PROJECT NO. #9 PROJECT LOCATION: In Cannon Road from Merwin Drive east to intersection with College Boulevard. PROJECT DESCRIPTION: Construct 4,400 feet of 12-inch watermain. PROJECT NEED: Provides water supply for new development and creates 375 Zone loop east of El Camino Real. FINANCING: Purpose Construction Adm/Design/lnsp Total Cost = Estimated Cost Funding Source $585,800 $175,000 $760,800 Water Connection Water Connection Cannon2 Page 125 CAPITAL PROJECT DESCRIPTION WATER DISTRIBUTION SYSTEM - CARLSBAD BOULEVARD SOUTH OF AVENIDA ENCINAS PROJECT NO. PROJECT NAME PROJECT LOCATION MAP: #22 PROJECT LOCATION: Carlsbad Boulevard from Avenida Encinas south to District boundary. PROJECT DESCRIPTION: Construct 4,900 feet of 12-inch watermain. PROJECT NEED: Provides a two-way emergency connection with San Diego Water District 240 Zone. Can also supply water to 318 Zone west of I-5. FINANCING: Purpose Construction Adm/Design/lnsp Total Cost = Estimated Cost Funding Source $647,200 $200,000 $847,200 Water Replacement Water Replacement Cbadblv2 Page 126 o o CAPITAL PROJECT DESCRIPTION WATER DISTRIBUTION SYSTEM - COLLEGE BOULEVARD FROM CANNON ROAD TO CARLSBAD VILLAGE DRIVE PROJECT NAME O 38921 PROJECT NO. PROJECT LOCATION MAP: LAKE CALAVERA PROJECT LOCATION: College Boulevard from future Cannon Road to Carlsbad Village Drive. PROJECT DESCRIPTION: Install 6,330 linear feet of 16-inch line and a pressure regulating station. (In 490-446 H.G. Zone) PROJECT NEED: To meet the future demands of the area by increasing supply capacity to 446 Zone from Maerkle Reservoir. FINANCING: Purpose Estimated Cost Funding Source Design/Construction $1,300,000 Water Connection Fee Total Cost = $1,300,000 COLLEGE3.doc Page 127 CAPITAL PROJECT DESCRIPTION WATER DISTRIBUTION SYSTEM - COLLEGE BOULEVARD - CANNON ROAD TO BADGER LANE PROJECT NO. PROJECT NAME PROJECT LOCATION MAP: ir PROJECT #8 PROJECT LOCATION: College Boulevard from Cannon Road south to Badger Lane. PROJECT DESCRIPTION: Construct 4,130 feet of 12-inch watermain. PROJECT NEED: Provides water supply for new development and creates 375 Zone loop east of El Camino Real. FINANCING: Purpose Construction Adm/Design/lnsp Total Cost = Estimated Cost Funding Source $568,900 Water Connection $145,200 Water Connection $714,100 College Page 128 CAPITAL PROJECT DESCRIPTION NONE WATER DISTRIBUTION SYSTEM - COLLEGE BOULEVARD (ECR TO CANNON ROAD) PROJECT NO. PROJECT NAME PROJECT LOCATION MAP: LAKE CALAVERA #7 PROJECT LOCATION: College Boulevard from 400' north of El Camino Real northerly to future Cannon Road. PROJECT DESCRIPTION: Install 4,000 LF of 16-inch line. (In 490 H.G. Zone) PROJECT NEED: To meet the future demands of the area from LFMP Zones 14 and 15. Developer to pay 50% of cost. FINANCING: Purpose Design/Construction Design/Construction Total Cost = Estimated Cost Funding Source $466,000 $466,000 $932,000 Water Connection Fee Other - Developer *Developer cost not shown in CIP schedules. Colleges Page 129 CAPITAL PROJECT DESCRIPTION WATER DISTRIBUTION SYSTEM - COLLEGE BOULEVARD MAERKLE RESERVOIR TO AGUA HEPIONDA CREEK PROJECT NAME 36631 PROJECT LOCATION MAP: ~l PROJECT NO. #10&#11 PROJECT LOCATION: From Maerkle Reservoir west to the future extension of College Boulevard. PROJECT DESCRIPTION: Install 9,300 LF of 36-inch waterline. (In 490 H.G. Zone). PROJECT NEED: Increase supply from Maerkle Reservoir and provide redundant supply pipeline. Supply to new 490 Zone development east of El Camino Real. FINANCING: Purpose Design/Adm/lnsp Construction Total Cost = Estimated Cost $662,100 $2,952,900 $3,615,000 Funding Source Water Replacement Water Replacement Maerkle2 Page 130 CAPITAL PROJECT DESCRIPTION WATER DISTRIBUTION SYSTEM - CRESTVIEW DRIVE TRANSMISSION MAIN PROJECT NAME NONE PROJECT NO. PROJECT LOCATION MAP: PROJECT PROJECT LOCATION: Crestview Drive west of El Camino Real. PROJECT DESCRIPTION: Construct 600 feet of 8-inch diameter pipeline. PROJECT NEED: To provide a redundant water supply to existing residential area. FINANCING: Estimated Cost Funding SourcePurpose Design Construction Total Cost = $30,000 $113,900 $143,900 Water Replacement Water Replacement No_agua Page 131 CAPITAL PROJECT DESCRIPTION WATER DISTRIBUTION SYSTEM - DEMOLITION OF WATER FACILITIES AT PAJAMA DRIVE PROJECT NAME 39551 PROJECT NO. PROJECT LOCATION MAP: ] PD DD DO. \ PROJECT LOCATION: Corner of Pajama Drive and Mesa Boulevard in the City of Oceanside. PROJECT DESCRIPTION: Remove an existing abandoned surge tank and a control building. PROJECT NEED: Facilities were abandoned in 1971 when Carlsbad began using imported water and quit pumping from the San Luis Rey River Valley. FINANCING: Purpose Estimated Cost Funding Source Construction $40,000 Admin/Design/Inspection $20,000 Water Replacement Water Replacement Total Cost =$60,000 Pajamadr Page 132 CAPITAL PROJECT DESCRIPTION NONE WATER DISTRIBUTION SYSTEM - DESALINATION GROUNDWATER/SEAWATER STUDY PROJECT NO PROJECT NAME PROJECT LOCATION MAP: N/A PROJECT LOCATION: Not Applicable. PROJECT DESCRIPTION: Preparation of a report investigating various methods of treating City owned groundwater located in the San Luis aquifer in Oceanside and identifying conveyance methods to transport the treated water to Carlsbad. Also included is a study of the feasibility of constructing a seawater desalination plant and identifying potential sites upon which to construct a desalination plant. PROJECT NEED: To develop supplemental source of water. FINANCING: Purpose Planning Study Total Cost = Estimated Cost $719,260 $719,260 Funding Source Water Replacement DESALINA Page 133 CAPITAL PROJECT DESCRIPTION WATER DISTRIBUTION SYSTEM - EL CAMINO REAL (PALOMAR AIRPORT ROAD SOUTH) PROJECT NAME 34461 PROJECT LOCATION MAP: PROJECT NO. #16 PROJECT LOCATION: El Camino Real - Palomar Airport Road South 6,100 LF. PROJECT DESCRIPTION: Replace 20" steel water line in El Camino Real South 6,100 LF with a new 24-inch water line. PROJECT NEED: Replacing old steel water line to avoid high maintenance costs and extend pipeline to new Poinsettia Lane road alignment. FINANCING: Purpose Design Construction Admin/Inspection Total Cost = Estimated Cost $305,000 $2,620,000 $300,000 $3,225,000 Funding Source Water Replacement Water Replacement Water Replacement ECRPARSO Page 134 CAPITAL PROJECT DESCRIPTION WATER DISTRIBUTION SYSTEM - EL CAMINO REAL BETWEEN COLLEGE & JACKSPAR PROJECT NO. PROJECT NAME PROJECT LOCATION MAP: #4 PROJECT LOCATION: Jackspar Drive from Longfellow to El Camino Real, south on El Camino Real to College Boulevard, and northeast on College Boulevard to Badger Lane. PROJECT DESCRIPTION: Construct 4,000 feet of 12-inch watermain. PROJECT NEED: Connects isolated portions of 375 Zone and provides for supply from Maerkle Reservoir for existing and future development. FINANCING: Purpose Construction Adm/Design/lnsp Total Cost = Estimated Cost Funding Source $529,600 $162,000 $691,600 Water Connection Water Connection Page 135 ColLECR CAPITAL PROJECT DESCRIPTION WATER DISTRIBUTION SYSTEM - EL CAMINO REAL CROSSING AT KELLY DRIVE PROJECT NAME NONE PROJECT LOCATION MAP: PROJECT NO. #31 PROJECT LOCATION: El Camino Real at Kelly Drive. PROJECT DESCRIPTION: Install 300 LF of 12" line. (In 490 H.G. Zone) PROJECT NEED: To meet the future demands of the area. Increase supply to 255 Zone directly from 490 Zone through Kelly Pressure Reducing Station. FINANCING: Purpose Estimated Cost Design/Construction $104,000 Total Cost = $104,000 Funding Source Water Connection ECRCROSS Page 136 CAPITAL PROJECT DESCRIPTION WATER DISTRIBUTION SYSTEM - EL CAMINO REAL TRANSMISSION MAIN LISA STREET TO KELLY DRIVE PROJECT NAME 38441 PROJECT LOCATION MAP: PROJECT NO. #3 PROJECT LOCATION: El Camino Real from Lisa Street to Kelly Drive. PROJECT DESCRIPTION: Construct 2,000 feet of 10-inch diameter pipeline from Lisa Street to Kelly Drive. PROJECT NEED: To provide a looping water pipeline in the area. Needed to meet master plan requirements and increase reliability. FINANCING: Purpose Design/Adm/lnsp Construction Total Cost = Estimated Cost Funding Source $50,000 $420,000 $470,000 Water Connection Water Connection ECR_tran Page 137 CAPITAL PROJECT DESCRIPTION WATER DISTRIBUTION SYSTEM - EL CAMINO REAL TRANSMISSION MAIN FROM FARADAY AVENUE TO COUGAR DRIVE PROJECT NAME 38431 PROJECT NO. PROJECT LOCATION MAP: PROJECT SITE PROJECT LOCATION: El Camino Real from Faraday Avenue north to Cougar Drive and pressure reducing station north side of Faraday Avenue. PROJECT DESCRIPTION: Construction of 1,500 feet of 30-inch diameter transmission main and pressure reducing station. PROJECT NEED: Larger diameter pipe reduces pressure loss during emergency supply to 550 Zone from Maerkle Reservoir. FINANCING: Purpose Design Construction Total Cost = Estimated Cost $50,000 $724,100 $774,100 Funding Source Water Replacement Water Replacement ECRTRANS Page 138 CAPITAL PROJECT DESCRIPTION WATER DISTRIBUTION SYSTEM - EL CAMINO REAL/CARLSBAD VILLAGE DRIVE WATER PIPELINE REPLACEMENT PROJECT NAME 39111 PROJECT NO. PROJECT LOCATION MAP: PROJECTSITE PROJECT LOCATION: El Camino Real at Carlsbad Village Drive. PROJECT DESCRIPTION: Replace 200 feet of existing 10-inch diameter water pipeline crossing El Camino Real at Carlsbad Village Drive. The pipeline shall be replaced between existing pressure reducing stations. Existing pipeline cannot be repaired. PROJECT NEED: Existing pipeline has corroded and cannot be repaired because of depth and interference with existing storm drain. This pipeline supplies water to an existing pressure reducing station supplying water to the 330 pressure zone. Replacing this pipeline will ensure water redundancy and reliability in the services area. FINANCING: Purpose Design Construction Total Cost = Estimated Cost $15,000 $50,000 $65,000 Funding Source Water Replacement Water Replacement ECR CVD Page 139 CAPITAL PROJECT DESCRIPTION WATER DISTRIBUTION SYSTEM - EL FUERTE (NORTH OF LOKEFO PROJECT NAME 39121 PROJECT LOCATION MAP: PROJECT PROJECT NO. #13 PROJECT LOCATION: El Fuerte Avenue between Loker north to future Faraday Avenue. PROJECT DESCRIPTION: Install 2,200 LF of 16-inch line. (In 700-550 H.G. Zone). PROJECT NEED: To meet the future demands of the area. Developer to pay 75% of the cost. Provides looped supply to new North 700 Zone. FINANCING: Purpose Design/Construction Design/Construction Total Cost = Estimated Cost Funding Source $148,750 $246,900 * $395,650 Water Connection Fee Other - Developer *Developer cost not shown in CIP schedules. ELFUERT5 Page 140 CAPITAL PROJECT DESCRIPTION WATER DISTRIBUTION SYSTEM - EL FUERTE (ALGA ROAD TO POINSETTIA LANE) PROJECT NAME 38161 PROJECT NO. PROJECT LOCATION MAP:PROJECT LOCATION: Future El Fuerte from Alga Road to Poinsettia Lane. PROJECT DESCRIPTION: Install 5,050 LF of 30-inch line and a pressure regulating station. (In 700 H.G. Zone). PROJECT NEED: To meet the future demands of the area. FINANCING: Purpose Estimated Cost Funding Source Design/Construction $2,000,000 Water Connection Fee Total Cost = $2,000,000 ELFUERTE Page 141 CAPITAL PROJECT DESCRIPTION 39131 WATER DISTRIBUTION SYSTEM - EL FUERTE fPOINSETTIA LANE TO PALOMAR AIRPORT ROAD) PROJECT NO. PROJECT NAME PROJECT LOCATION MAP: #15 PROJECT LOCATION: Future El Fuerte south of Palomar Airport Road. PROJECT DESCRIPTION: Install 5,200 LF of 24-inch line. PROJECT NEED: To meet the future demands of the area. Connects 700 North and 700 South pressure zones. FINANCING: Purpose Design/Adm/lnsp Construction Total Cost = Estimated Cost Funding Source $291,000 $850,000 $1,141,000 Water Connection Fee Water Connection Fee ELFUERT4 Page 142 CAPITAL PROJECT DESCRIPTION WATER DISTRIBUTION SYSTEM - EL FUERTE AND CORINTIA STREET PROJECT NAME PROJECT LOCATION MAP: PROJECT NO. #21 PROJECT LOCATION: Intersection of El Fuerte and Corintia Street. PROJECT DESCRIPTION: Construct Pressure Reducing Station. PROJECT NEED: Provide redundant water supply to 680,580 South and 510 Zones. FINANCING: Estimated Cost Funding SourcePurpose Construction Adm/Design/lnsp Total Cost = $114,400 $35,000 $149,400 Water Replacement Water Replacement EIFuertS Page 143 CAPITAL PROJECT DESCRIPTION WATER DISTRIBUTION SYSTEM - FARADAY AVENUE EXTENSION PROJECT NAME PROJECT LOCATION MAP: PROJECT PROJECT NO. #14 PROJECT LOCATION: In future Faraday Avenue extension between El Fuerte and Melrose Avenue. PROJECT DESCRIPTION: Construct 3,600 feet of 16-inch watermain. PROJECT NEED: Provides looped study to LFMZ Zone 16 and supply to 550 Zone from 700 to 550 PRV. FINANCING: Purpose Construction Adm/Design/lnsp Total Cost = Estimated Cost Funding Source $549,800 $167,000 $716,800 Water Connection Water Connection Faraday Page 144 CAPITAL PROJECT DESCRIPTION WATER DISTRIBUTION SYSTEM - FOUSSAT ROAD WELL ABANDONMENT PROJECT NAME 39031 PROJECT LOCATION MAP: PROJECT NO. #32 PROJECT LOCATION: Southeast corner of Foussat Road and Mission Avenue in Oceanside. PROJECT DESCRIPTION: Abandon well per State standards, remove pumps, valves, concrete structures and general restoration of property. PROJECT NEED: The existing well and equipment are not usable and must be properly removed. FINANCING: Estimated Cost Funding SourcePurpose Design Construction Total Cost = $40,000 $162,500 $202,500 Water Replacement Fund Water Replacement Fund Foussat Page 145 O O CAPITAL PROJECT DESCRIPTION WATER DISTRIBUTION SYSTEM - LAKE CALAVERA RESERVOIR IMPROVEMENTS PROJECT NAME O 38211 PROJECT NO. PROJECT LOCATION MAP: a CITY OF OCEANSIDE JU - ^ CITY OTCARISBAD"" LAKE CALAVERA PROJECT LOCATION: Lake Calavera in the northeast quadrant of the City. PROJECT DESCRIPTION: Replace outlet tower valves and piping to restore function. Repair existing spillway and channel to improve flow, safety, and access. Upgrade existing access road and improve security with fencing and gates. PROJECT NEED: The existing valves located within the outlet tower have failed and water is presently draining from the reservoir and cannot be stopped. Left unrepaired, the lake will completely dry up and does not comply with dam safety requirements. The walkway structure to the outlet tower was removed due to safety issues, but direct access to the outlet structure needs to be restored for maintenance purposes. Repair of the outlet structure will also allow Calavera Dam to function as a flood control retention facility to help alleviate potential downstream flooding in the area of the Rancho Carlsbad Mobile Home Park. FINANCING: Purpose Environmental Design Construction Admin/Inspection Total Cost = Estimated Cost Funding Source $57,850 $404,800 $2,936,220 $294,230 $3,693,100 Water Replacement Water Replacement Water Replacement Water Replacement Lake cal Page 146 CAPITAL PROJECT DESCRIPTION WATER DISTRIBUTION SYSTEM - MAERKLE PUMP STATION PROJECT NAME PROJECT LOCATION MAP: MAERKLE PROJECT NO. #29(a) & (b) PROJECT LOCATION: Maerkle Reservoir. PROJECT DESCRIPTION: Enlarge pump station. PROJECT NEED: Required for emergency supply from Maerkle Reservoir. FINANCING: Purpose Estimated Cost Funding Source Construction Construction Total Cost = $747,100 $747,100 $1,494,200 Water Connection Water Replacement Page 147 MaerkleS CAPITAL PROJECT DESCRIPTION WATER DISTRIBUTION SYSTEM - MAERKLE RESERVOIR STORAGE (TAP #2) PROJECT NAME PROJECT LOCATION MAP: PROJECT NO. #28 PROJECT LOCATION: Adjacent to Maerkle Reservoir. PROJECT DESCRIPTION: Construct buried 15 MG water storage reservoir next to existing Maerkle Reservoir. PROJECT NEED: Provides additional emergency storage to meet 10-day storage criteria based on ultimate demands. FINANCING: Purpose Construction Adm/Design/lnsp Total Cost = Estimated Cost Funding Source $11,225,300 $1,475,000 $12,700,300 Water Connection Water Connection Maerkle Page 148 CAPITAL PROJECT DESCRIPTION NONE WATER DISTRIBUTION SYSTEM - MARRON ROAD (PRESSURE REGULATING STATION TO OCEANSIDE) PROJECT NO. PROJECT NAME PROJECT LOCATION MAP: PROJECT PROJECT LOCATION: Marron Road from Avenida de Anita easterly 6,600 feet. PROJECT DESCRIPTION: Install 6,600 LF of 12-inch line and two pressure regulating stations. Developer to pay 50% of cost. PROJECT NEED: To meet future demands in accordance with Growth Management Standards. Provide additional supply to 255 Zone. FINANCING: Purpose Estimated Cost Design/Construction $684,000 Design/Construction $684,000 Funding Source Water Connection Other - Developer Total Cost =$1,368,000 *Developer cost not included in CIP schedules. MARRONRD Page 149 CAPITAL PROJECT DESCRIPTION WATER DISTRIBUTION SYSTEM - MASTER PLAN UPDATE PROJECT NAME NONE PROJECT NO. PROJECT LOCATION MAP: LOCATIONS THROUGHOUT THE CITY PROJECT LOCATION: Throughout the City. PROJECT DESCRIPTION: Update the CMWD's 2003 Water Master Plan based on anticipated growth projections and obtain necessary CEQA approval through an amendment to the EIR for adoption by City Council. PROJECT NEED: The Master Plan update will help identify the need for changes to planned facilities based on the timing of growth projections and Growth Management Standards. FINANCING: Study Total Cost = Estimated Cost $47,800 $47,800 Funding Source Water Connection Fee Mstrplan Page 150 CAPITAL PROJECT DESCRIPTION WATER DISTRIBUTION SYSTEM - MELROSE DRIVE PALOMAR AIRPORT ROAD TO FARADAY PROJECT NO. PROJECT NAME PROJECT LOCATION MAP: PROJECT #12 PROJECT LOCATION: Melrose Drive between Palomar Airport Road and Faraday Avenue. PROJECT DESCRIPTION: Construct 4,000 feet of 16-inch watermain. PROJECT NEED: Provide looped supply to new North 700 Zone in LFMZ Zone 16 business park. FINANCING: Estimated Cost Funding SourcePurpose Construction Adm/Design/lnsp Total Cost = $609,800 $186,500 $796,300 Water Connection Water Connection Melrose Page 151 CAPITAL PROJECT DESCRIPTION WATER DISTRIBUTION SYSTEM - MISCELLANEOUS PIPELINE REPLACEMENTS PROJECT NAME 39041 PROJECT NO. PROJECT LOCATION MAP: CITYWIDE PROJECT LOCATION: Various locations. PROJECT DESCRIPTION: Replace existing small diameter and older pipelines at 14 locations. PROJECT NEED: Provide increased water supply to meet fire flow requirements. FINANCING: Estimated Cost Funding SourcePurpose Design Construction Admin/Inspection Total Cost = $150,000 $1,609,900 $49,900 $1,809,800 Water Replacement Water Replacement Water Replacement WTFLPIPE Page 152 CAPITAL PROJECT DESCRIPTION 38231 WATER DISTRIBUTION SYSTEM - MISCELLANEOUS STORAGE TANK REPAIRS PROJECT NO PROJECT NAME PROJECT LOCATION MAP: VARIOUS LOCATIONS PROJECT LOCATION: At various existing storage tank locations. PROJECT DESCRIPTION: Remove and replace deteriorated tank floor sections, ladders and appurtenances. Install cathodic protection systems. PROJECT NEED: Existing tanks have corrosion problems to rectify. FINANCING: Estimated Cost Funding SourcePurpose Design Construction Total Cost = $20,000 $141,000 $161,000 Water Replacement Water Replacement Misctank Page 153 CAPITAL PROJECT DESCRIPTION 38221 WATER DISTRIBUTION SYSTEM - MISCELLANEOUS WATER RESERVOIR FENCING PROJECT NO PROJECT NAME PROJECT LOCATION MAP: U\ COSTA LO PROJECT LOCATION: At various water reservoir locations throughout the City as shown on the map including the TAP, "C", "E", Santa Fe II and La Costa Lo. PROJECT DESCRIPTION: Install protective fencing around the identified reservoir sites for safety and security purposes. PROJECT NEED: Project is required to protect the existing reservoir sites from vandalism and to ensure safety of the public. Ongoing development in the City has made these once isolated reservoir sites more accessible to the public thus intensifying the need for protective fencing. FINANCING: Purpose Construction Total Cost = Estimated Cost Funding Source $120,400 Water Replacement Fund $120,400 Reservoirs Page 154 CAPITAL PROJECT DESCRIPTION WATER DISTRIBUTION SYSTEM - OCEANSIDE INTERTIE UPGRADE PROJECT NAME 35311 PROJECT NO. PROJECT LOCATION MAP: PROJECT PROJECT LOCATION: El Camino Real near State Highway 78. PROJECT DESCRIPTION: Make improvements to increase reliability of water system intertie with City of Oceanside. System supplies 5 cfs of treated water to Carlsbad. During emergencies and periods of water supply curtailment, the Oceanside intertie provides backup. PROJECT NEED: The system requires valve, pipe, and meter replacement. FINANCING: Purpose Estimated Cost Funding Source Design/Construction $110,700 Water Replacement Total Cost = $110,700 OSIDEINT Page 155 CAPITAL PROJECT DESCRIPTION WATER DISTRIBUTION SYSTEM - PALOMAR AIRPORT (NORTH OF OWENS) PROJECT NAME 34791 PROJECT NO. PROJECT LOCATION MAP:PROJECT LOCATION: In Palomar Airport from Owens Place to Airport Road. PROJECT DESCRIPTION: Install 625 LF of 12" line. PROJECT NEED: To meet the future demands of the airport area and two-way feed. FINANCING: Purpose Estimated Cost Funding Source Design/Construction $150,000 Water Connection Fee Total Cost = $150,000 PALAIRPT Page 156 CAPITAL PROJECT DESCRIPTION WATER DISTRIBUTION SYSTEM - PALOMAR AIRPORT ROAD/EL CAMINO REAL PUMP STATION PROJECT NAME PROJECT LOCATION MAP: 39101 & 39102 PROJECT NO. #20 PROJECT LOCATION: Intersection of Palomar Airport Road and El Camino Real. PROJECT DESCRIPTION: Grade site and construct a pump station to supply water from 490 pressure zone to 700 pressure zone. PROJECT NEED: To supply water from Maerkle Reservoir (490 pressure zone) to 700 pressure zone during emergencies and during routine maintenance of the imported water aqueducts. FINANCING: Purpose Construction Construction Total Cost = Estimated Cost $990,350 $997,350 $1,987,700 Funding Source Water Replacement Fee Water Connection Fee 700 ZONE Page 157 CAPITAL PROJECT DESCRIPTION WATER DISTRIBUTION SYSTEM - POINSETTIA LANE (EL CAMINO REAL TO SKIMMER COURT) PROJECT NAME PROJECT LOCATION MAP: PROJECT NO. $25 PROJECT LOCATION: Poinsettia Lane from El Camino Real to Skimmer Court. PROJECT DESCRIPTION: Install 1,300 LF of 12-inch line. (In 375 H.G. Zone). PROJECT NEED: Parallel existing 8-inches to increase capacity in the 375 Zone and supply from 550 Zone. FINANCING: Purpose Design/Adm/lnsp Construction Total Cost = Estimated Cost Funding Source $50,000 $174,800 $224,800 Water Connection Fee Water Connection Fee POINSET2 Page 158 o oCAPITAL PROJECT DESCRIPTION O WATER DISTRIBUTION SYSTEM - POINSETTIA LANE (SKIMMER COURT TO CASSIA ROAD) PROJECT NAME PROJECT LOCATION MAP: PROJECT NO. #17 PROJECT LOCATION: In Poinsettia Lane between Skimmer Court and Cassia Road. PROJECT DESCRIPTION: Construct 4,500 feet of 12-inch watermain. PROJECT NEED: Completes 375 Loop on Poinsettia Lane. Increase capacity to/from D3 Reservoir. FINANCING: Purpose Construction Construction Total Cost = Estimated Cost Funding Source $342,000 $436,100 $778,100 Water Connection Water Replacement Poinskim Page 159 CAPITAL PROJECT DESCRIPTION WATER DISTRIBUTION SYSTEM - POINSETTIA LANE EAST OF BLACK RAIL ROAD PROJECT NO PROJECT NAME PROJECT LOCATION MAP: #18 PROJECT LOCATION: Poinsettia Lane - 1,100 feet east of Black Rail Road. PROJECT DESCRIPTION: Construct 1,100 feet of 30-inch watermain. PROJECT NEED: Increase supply to 550 Zone and D3 Reservoir. FINANCING: Estimated Cost Funding SourcePurpose Construction Construction Total Cost = $205,500 $205,400 $410,900 Water Connection Water Replacement Poinblack Page 160 CAPITAL PROJECT DESCRIPTION WATER DISTRIBUTION SYSTEM - PRESSURE REDUCING STATION - SYCAMORE CREEK PROJECT NO. PROJECT NAME PROJECT LOCATION MAP: PROJECT #30 PROJECT LOCATION: Within Sycamore Creek area of LFMZ Zone 15. PROJECT DESCRIPTION: Upgrade existing Pressure Reducing Station for 490 to 375 Zone. PROJECT NEED: Increase capacity of existing Pressure Reducing Station to supply new development from 490 Zone. FINANCING: Purpose Construction Adm/Design/lnsp Total Cost = Estimated Cost Funding Source $87,100 $25,000 $112,100 Water Connection Water Connection PRSJmpr Page 161 CAPITAL PROJECT DESCRIPTION WATER DISTRIBUTION SYSTEM - PRESSURE REGULATING STATION (CANNON ROAD AND COLLEGE BOULEVARD) PROJECT NAME 38781 PROJECT NO. PROJECT LOCATION MAP: WKE CALAVERA PROJECT LOCATION: Future intersection of Cannon Road and College Boulevard. PROJECT DESCRIPTION: Install pressure regulating station. Special Note: This project will take place when the existing Cannon Reservoir is taken out of service. (In 490-392 H.G. Zones). PROJECT NEED: To meet the future demands of the area. FINANCING: Purpose Estimated Cost Funding Source Design/Construction $250,000 Water Connection Fee Total Cost = $250,000 PRESSREG Page 162 CAPITAL PROJECT DESCRIPTION 38581 WATER DISTRIBUTION SYSTEM - RANCHO CARRILLO OVERSIZING/EXTENSION PROJECT NO. PROJECT NAME PROJECT LOCATION MAP: OVERSIZE PIPELINE PROJECT LOCATION: The waterline extends from Melrose Drive west along Via Patron and Terraza Portico to an existing waterline in Carrillo Way. Also include are two short extension within Paseo Aspada and Rancho Miel. PROJECT DESCRIPTION: Construction of new 8" and 10" water mains. A 10" waterline will be extended from an existing waterline in Melrose Drive to an existing waterline in Carrillo Way through the Village 'N' development of Rancho Carrillo to provide a looped water connection. The project also includes the extension of two 8" lines within Paseo Aspada and rancho Miel to complete the looped system. PROJECT NEED: To meet the future demands of the area and to provide for a looped water line for greater reliability to the existing residents within Village 'N' of the Rancho Carrillo development. FINANCING: Purpose Design/Construction Total Cost = Estimated Cost $93,700 $93,700 Funding Source Water Connection Fee RC Over Page 163 CAPITAL PROJECT DESCRIPTION WATER DISTRIBUTION SYSTEM - SAN MARCOS BLVD. PIPELINE REPLACEMENT PALOMAR AIRPORT ROAD WEST OF SAN DIEGO COUNTY WATER AUTHORITY (SDCWA) PROJECT NAME 39561 PROJECT LOCATION MAP: PROJECT NO. #26 PROJECT LOCATION: Palomar Airport Road west of the San Diego County Water Authority (SDCWA) Connection #1. PROJECT DESCRIPTION: Replace approximately 4,100 feet of existing 27-inch and 21-inch diameter steel waterline with new 30-inch steel watermain. PROJECT NEED: Reduce velocity and provide increased capacity from SDCWA #1 Connection to 700 Zone. In addition, both the 21-inch and 27-inch pipes are over 40 years old and at the end of their service life. FINANCING: Purpose Design Construction Adm/lnsp Total Cost = Estimated Cost Funding Source $101,000 $2,780,000 $120,000 $3,001,000 Water Replacement Water Replacement Water Replacement PARwater Page 164 CAPITAL PROJECT DESCRIPTION 39151 WATER DISTRIBUTION SYSTEM - TANGLEWOOD PRESSURE REDUCING STATION REPLACEMENT PROJECT NO PROJECT NAME PROJECT LOCATION MAP:PROJECT LOCATION: Intersection of Carlsbad Village Drive and El Camino Real. PROJECT DESCRIPTION: Replace vault, piping and valves of existing pressure reducing station. PROJECT NEED: The existing pressure reducing station is to be replaced due to deteriorated condition of vault, valve and piping. FINANCING: Purpose Design Construction Total Cost = Estimated Cost Funding Source $50,000 $282,000 $332,000 Water Replacement Fund Water Replacement Fund Tangle Page 165 CAPITAL PROJECT DESCRIPTION WATER DISTRIBUTION SYSTEM - TAP RESERVOIR EXTERIOR PAINTING PROJECT NAME 38531 PROJECT NO. PROJECT LOCATION MAP:PROJECT LOCATION: Northwest corner of Carlsbad Village Drive at College Boulevard. PROJECT DESCRIPTION: Repaint the exterior of TAP Reservoir. PROJECT NEED: The existing paint has deteriorated and requires repainting prior to new homes being constructed. Also will include anti-graffiti coating. FINANCING: Purpose Design Construction Total Cost = Estimated Cost Funding Source $5,000 $127,700 $132,700 Water Replacement Water Replacement Extr_pnt Page 166 CAPITAL PROJECT DESCRIPTION WATER DISTRIBUTION SYSTEM - WATER OPERATIONS WATER PUMP PROJECT PROJECT NAME 39001 PROJECT NO. PROJECT LOCATION MAP:PROJECT LOCATION: Ellery Pump Station - Janis Way. PROJECT DESCRIPTION: The Water District's Ellery Pump Station is designed to maintain adequate flow during fire demands and boost pressure in the event of a significant drop in pressure or increase in demand. The pump station operates from a motor control center that has a service life in excess of twenty years. The scope of this project is the replacement of the pump station's motor control center. PROJECT NEED: The motor control center for the Ellery Pump Station has over twenty years of service life. Its design is outdated, major components are obsolete and, as a result, repairs may not be possible. Replacement of the motor control center will ensure reliability, efficiency, availability of parts and the ability to pull maintenance in a safe and timely manner. FINANCING: Purpose Construction Total Cost = Estimated Cost $60,900 $60,900 Funding Source Water Replacement Waterpmp Page 167 CAPITAL PROJECT DESCRIPTION WATER DISTRIBUTION SYSTEM - WATER SYSTEM INTERTIE CONNECTION PROJECT NAME 36641 PROJECT NO. PROJECT LOCATION MAP:PROJECT LOCATION: VID - Business Park Drive Vallecitos Water District Olivenhain Water District San Dieguito Water District PROJECT DESCRIPTION: Construct pipeline system intertie with adjacent water agencies including Vista Irrigation District, Vallecitos Water District, Olivenhain Water District, and San Dieguito Water District. PROJECT NEED: During emergencies, these interties could supply water to the City and also provide water back to the adjacent agencies. FINANCING: Purpose Design/Construction Total Cost = Estimated Cost $439,000 $439,000 Funding Source Water Replacement WTRINTER Page 168 RECYCLED WATER PROJECTS FUNDING MATRIX FOR RECYCLED WATER PROJECTS PROJ NO. NEW 39141 34871 36753 38881 38901 38871 38891 PROJECT TITLE CHESTNUT AVENUE RECYCLED WATER LINE ECR/TAMARACK PUMP STATION REMOVAL I-5 RECYCLED WATER TRANSMISSION LINE PASEO DEL NORTE RECYCLED PIPELINE REPLACEMENT PUMP STATION REMOVAL RECYCLED WATER PH II - FACILITY RECYCLED WATER PH II - FLOW EQUALIZATION RECYCLED WATER PH II - MAHR RESERVOIR IMPROV. RECYCLED WATER PH II - PIPELINES RECYCLED WATER PH II - PUMP STATIONS FUNDING SOURCE WATER REPL WATER REPL WATER REPL WATER REPL WATER REPL RECL WATER RECL WATER RECL WATER RECL WATER RECL WATER TOTAL BUDGET 436,100 76,500 133,305 727,200 442,700 12,165,018 4,093,279 2,346,000 21,852,521 4,918,574 FUTURE YEAR BUDGET AMOUNTS YEAR1 2005-2006 133,305 67,200 442,700 YEAR 2 2006-2007 436,100 YEAR 3 2007-2008 76,500 YEAR 4 2008-2009 YEARS 2009-2010 YEAR 6-10 2010-2015 BUILDOUT 2015-2020 Page 169 o o CAPITAL PROJECT DESCRIPTION RECYCLED WATER PROJECTS - CHESTNUT AVENUE RECYCLED WATER LINE PROJECT NAME O NONE PROJECT NO. PROJECT LOCATION MAP:PROJECT LOCATION: Chestnut Avenue from 1-5 to SDNR right-of-way. PROJECT DESCRIPTION: Construct an 8-inch PVC recycled waterline in Chestnut Avenue from the existing line in 1-5 to the railroad right-of-way. PROJECT NEED: The new 8-inch line will provide the distribution of recycled water to the future Pine School Park and the Coastal Rail Trail. FINANCING: Purpose Administration Design Construction Total Cost = Estimated Cost Funding Source $17,000 $25,000 $394,100 $436,100 Water Replacement Water Replacement Water Replacement Chestnut Page 170 CAPITAL PROJECT DESCRIPTION RECYCLED WATER PROJECTS - EL CAMINO REAL AND TAMARACK RW PUMP STATION PROJECT NAME NONE PROJECT NO. PROJECT LOCATION MAP: CALAVERA /f"WASTEWATER // //TREATMENT /( c~7 PLANT /T^"A // PROJECT LOCATION: Southeast corner of El Camino Real and Tamarack Avenue. PROJECT DESCRIPTION: Remove existing pump station and rehabilitate the site. PROJECT NEED: Existing pump station was constructed for the Calavera Wastewater Treatment Plant, which is no longer necessary. Removes attractive nuisance and reduces maintenance needs. FINANCING: Purpose Design Construction Admin/Inspection Total Cost = Estimated Cost $10,000 $50,000 $16,500 $76,500 Funding Source Recycled Water Recycled Water Recycled Water ECR_PUMP Page 171 CAPITAL PROJECT DESCRIPTION RECYCLED WATER PROJECTS -1-5 RECYCLED WATER TRANSMISSION LINE PROJECT NAME 35861 PROJECT NO. PROJECT LOCATION MAP: PROJECT PROJECT LOCATION: I-5 Freeway from Palomar Airport Road to Carlsbad Village Drive. PROJECT DESCRIPTION: Caltrans installed a transmission main from Poinsettia Lane north to Jefferson Street in 1996. The pipeline was oversized to supply recycled water to areas north of Tamarack Avenue. PROJECT NEED: To supply recycled water to Carlsbad north of Tamarack Avenue. FINANCING: Purpose Estimated Cost Funding Source Design/Construction $133,305 Recycled Water Total Cost = $133,305 I5TRNSLN Page 172 CAPITAL PROJECT DESCRIPTION 39141 RECYCLED WATER PROJECTS - PASEO DEL NORTE RECYCLED PIPELINE REPLACEMENT PROJECT NO PROJECT NAME PROJECT LOCATION MAP:PROJECT LOCATION: In Paseo Del Norte from Poinsettia Park boundary north to Palomar Airport Road. PROJECT DESCRIPTION: Construct 4,000 feet of 12-inch diameter pipe in Paseo Del Norte from Sea Gate Drive to Palomar Airport Road, and in Palomar Airport Road from Paseo Del Norte to Armada Drive. Other alternative pipeline alignments will be considered. PROJECT NEED: The existing 12-inch diameter steel pipeline, installed in 1962, from Paseo Del Norte north to Palomar Airport Road broke in 2001. The existing pipeline is located in an easement that crosses Encinas Creek near the entrance to Costco. Attempts made to locate and fix the break have been unsuccessful primarily because of the woodland area. The recycled water master plan requires this pipeline to be in place to provide adequate flows to areas north of Palomar Airport Road in the 384 pressure zone for future recycled water customers. FINANCING: Purpose Estimated Cost Design & Environmental $60,000 Construction $667,200 Funding Source Water Replacement Water Replacement Total Cost =$727,200 PDN_pipe Page 173 CAPITAL PROJECT DESCRIPTION RECYCLED WATER - PUMP STATION REMOVAL PROJECT NAME 34871 PROJECT NO. PROJECT LOCATION MAP: PROJECT PROJECT LOCATION: El Camino Real south of Palomar Airport Road. PROJECT DESCRIPTION: Remove existing pump station and rehabilitate site. PROJECT NEED: Upon completion of Encina Basin Phase II and Carlsbad Boulevard Reclamation Facility Projects, existing pump station is no longer necessary. FINANCING: Purpose Estimated Cost Funding Source Design/Construction $442,700 Recycled Water Total Cost = $442,700 RCSTNUPG Page 174 CAPITAL PROJECT DESCRIPTION RECYCLED WATER PHASE II - FACILITY PROJECT NAME 36753 PROJECT NO. PROJECT LOCATION MAP: ROJECT SITE PROJECT LOCATION: South of Encina Water Pollution Control Facility (EWPCF). PROJECT DESCRIPTION: Design and construction of the Phase II Recycled Water Treatment Facilities near EWPCF on Avenida Encinas (4.0 mgd). This project is one of a series of projects included in the Phase II Recycled Water Program as identified in the City's Recycled Water Master Plan. PROJECT NEED: To provide additional recycled water to meet Phase II demand requirements of 4,480 acre-feet per year. FINANCING: Purpose Construction Total Cost = Estimated Cost Funding Source $12,165,018 Recycled Water $12,165,018 Trt_plnt Page 175 CAPITAL PROJECT DESCRIPTION RECYCLED WATER - RECYCLED WATER PHASE II - FLOW EQUALIZATION PROJECT NAME 38881 PROJECT NO. PROJECT LOCATION MAP: V, PROJECT SITE PROJECT LOCATION: Adjacent to the Carlsbad Water Reclamation Facility. PROJECT DESCRIPTION: Construction of a water storage facility adjacent to the Encina WPCF for the dual purpose of providing a clean/veil for plant operations and a forebay, which would allow the pumps to operate at a constant discharge rate or adjust pumping rates based on peak irrigation periods. PROJECT NEED: Reduce the use of potable water by providing reclaimed water for irrigation purposes. FINANCING: Purpose Total Cost = Estimated Cost $4,093,279 Funding Source Recycled Water Flowequa Page 176 CAPITAL PROJECT DESCRIPTION RECYCLED WATER PROJECTS - PHASE II - MAHR RESERVOIR IMPROVEMENTS PROJECT NAME 38901 PROJECT NO. PROJECT LOCATION MAP: HWY78 PROJECT LOCATION: At Mahr Reservoir. PROJECT DESCRIPTION: Mahr Reservoir is an existing earthen fill dam constructed in 1982 to store recycled water from the Meadowlark Reclamation Facility. It is located east of Rancho Santa Fe Road just south of Melrose Drive. Both the Meadowlark Reclamation Facility and Mahr Reservoir are owned and operated by Vallecitos Water District (VWD). PROJECT NEED: To meet water quality and operation needs for CMWD's recycled water system requires certain improvements be made to Mahr Reservoir. These improvements include: • Dredging and cleaning the reservoir bottom • Modifying the inlet/outlet works • Adding an aeration/destratification system • Performing miscellaneous site work FINANCING: Purpose Total Cost = Estimated Cost $2,346,000 Funding Source Recycled Water Mahr Page 177 CAPITAL PROJECT DESCRIPTION RECYCLED WATER - RECYCLED WATER PHASE II - PIPELINES PROJECT NAME 38871 PROJECT NO. PROJECT LOCATION MAP: PROJECT:A PROJECT LOCATION: Palomar Airport industrial corridor and portion of northeast quadrant. PROJECT DESCRIPTION: Construction of approximately 120,126 feet of distribution pipelines ranging in size from 4 inches to 24 inches in diameter, 3 pressure reducing stations and connecting the Carlsbad Water Reclamation Facility with the Mahr Reservoir. PROJECT NEED: Reduce the use of potable water by providing reclaimed water for irrigation purposes. FINANCING: Purpose Total Cost = Estimated Cost Funding Source $21,852,521 Recycled Water Pipeline Page 178 CAPITAL PROJECT DESCRIPTION RECYCLED WATER - RECYCLED WATER PHASE II - PUMP STATIONS PROJECT NAME 38891 PROJECT NO. PROJECT LOCATION MAP: CAUWERA PUMP STATION PAR/ECR SI PROJECT LOCATION: "D" Tanks, Palomar Airport Road and El Camino Real, and College Boulevard north of Cannon Road. PROJECT DESCRIPTION: Construction of pump stations to transport reclaimed water to the following service areas: • "D" Tank Pump Station (384/550 Zone) • Calavera Pump Station (550 Zone) • PAR/ECR Pump Station (660 Zone) PROJECT NEED: To reduce the use of potable water by providing reclaimed water for irrigation purposes. FINANCING: Purpose Total Cost = Estimated Cost Funding Source $4,918,574 Recycled Water Pumpstat Page 179 CIRCULATION SYSTEM PROJECTS TRAFFIC SIGNAL PROJECTS FUNDING MATRIX FOR TRAFFIC SIGNAL PROJECTS PROJ NO. 33692 33693 NEW 39161 39021 NEW 38461 39171 38991 NEW 38001 NEW 36211 NEW 39381 36441 39351 39391 39461 38821 34061 39401 NEW PROJECT TITLE TRAP SIG - ALGA ROAD AND CAZADERO TRAP SIG - AVIARA PARKWAY-POINSETTIA LANE TO EL CAMINO REAL TRAP SIG - AVIARA PARKWAY-POINSETTIA LANE TO EL CAMINO REAL TRAP SIG - AVIARA PKWY AND CAMINO DE LAS ONDAS- REIMS TRAP SIG - CALLE BARCELONA AND PASEO AVELLANO TRAP SIG - CAMINO DE LOS COCHES AND CALLE ACERVO TRAP SIG - CAMINO DE LOS COCHES AND LA COSTA AVENUE TRAP SIG - CAMINO VIDA ROBLE AND YARROW DRIVE TRAP SIG - CANNON ROAD AND AVENIDA ENCINAS TRAP SIG - CANNON ROAD AND COLLEGE BOULEVARD TRAP SIG - CARLSBAD BLVD & TAMARACK SIGNAL REPAIRS TRAP SIG - CARLSBAD BOULEVARD AND CHERRY AVE TRAP SIG - CARLSBAD VILLAGE DRIVE AND GLASGOW DR TRAP SIG - COLLEGE BOULEVARD AND CARLSBAD VILLAGE DR - Reimb TRAP SIG - EL CAM. REAL/PLAZA/MARRON/HOSP WY TRAP SIG - EL CAMINO REAL AND CHESTNUT SIGNAL REPAIRS TRAP SIG - EL CAMINO REAL AND POINSETTIA LANE TRAP SIG - EL CAMINO REAL AND TAMARACK SIGNAL REPAIRS TRAP SIG - FARADAY AVE. AND CAMINO HILLS DRIVE TRAP SIG - FARADAY AVENUE AND ORION STREET TRAP SIG - FARADAY AVENUE AND PRIESTLY DRIVE TRAP SIG - FARADAY AVENUE AND RUTHERFORD ROAD TRAP SIG - LA COSTA AVENUE AND ESFERA STREET TRAP SIG - LA COSTA AVENUE AND LEVANTE TRAP SIG - LA COSTA AVENUE/NUEVA CASTILLA TRAP SIG - MELROSE DRIVE AND LA COSTA AVENUE TRAP SIG - MONROE STREET AND HOSP WAY TRAP SIG - PALOMAR AIRPORT ROAD AND MELROSE DRIVE TRAP SIG - PASEO DEL NORTE AND CAR COUNTRY DR TRAP SIG - POINSETTIA LANE AND BLACKRAIL ROAD TRAP SIG - POINSETTIA LANE AND BRIGANTINE ROAD TRAP SIG - POINSETTIA LANE AND EL FUERTE STREET (REIMB) TRAP SIG - POINSETTIA LANE AND SNAPDRAGON DR TRAP SIG - RANCHO SANTA FE ROAD AND CALLE JUNIPERO TRAP SIG - RANCHO SANTA FE ROAD AND SAN ELIJO ROAD TRAP SIG - TAMARACK AVE. AND PONTIAC DRIVE TRAP SIG - TAMARACK AVE. AND VALLEY STREET TRAP SIG - TAMARACK AVENUE AND GARFIELD STREET VIDEO DETECTION CONVERSION FUNDING SOURCE GAS TAX OTHER GCC GCC GCC GCC PFF PFF PFF PFF IRF GCC GCC PFF TRANSNET-LOC IRF PFF IRF GCC TIF GAS TAX GCC GAS TAX GCC GCC PFF GCC PFF GAS TAX GCC GCC PFF GAS TAX PFF GCC GCC GCC PFF GAS TAX TOTAL BUDGET 210,000 863,000 260,000 105,000 210,000 190,000 185,000 185,000 150,000 210,000 230,000 185,000 210,000 210,000 1,311,000 206,000 204,250 141,000 185,000 210,000 210,000 185,000 190,000 210,000 185,000 185,000 210,000 250,000 210,000 210,000 185,000 210,000 190,000 210,000 125,000 210,000 185,000 210,000 1,850,000 FUTURE YEAR BUDGET AMOUNTS YEAR1 2005-2006 105,000 230,000 206,000 141,000 210,000 517,000 YEAR 2 2006-2007 67,000 YEAR 3 2007-2008 190,000 277,000 YEAR 4 2008-2009 260,000 100,000 247,000 YEARS 2009-2010 307,000 YEAR 6-10 2010-2015 210,000 210,000 185,000 210,000 185,000 210,000 185,000 185,000 185,000 210,000 185,000 210,000 185,000 435,000 BUILDOUT 2015-2020 185,000 185,000 210,000 Page 180 CAPITAL PROJECT DESCRIPTION NONE CIRCULATION SYSTEM TRAFFIC SIGNALS - ALGA ROAD AND CAZADERO DRIVE PROJECT NO PROJECT NAME PROJECT LOCATION MAP:PROJECT LOCATION: At the intersection of Alga Road and Cazadero Drive. PROJECT DESCRIPTION: Installation of a four-leg, fully actuated traffic signal, including a type 170 controller, 200SA local intersection control program, video detection, battery back-up system, appurtenant signing and striping, and signal interconnect to adjacent controllers. PROJECT NEED: Caltrans signal warrants have been met. The intersection is listed on the qualification list of the City's Traffic Signal Evaluation Policy. The installation of this traffic signal will assign the right-of-way for both motorists and pedestrians entering and crossing at the intersection. FINANCING: Purpose Design Construction Admin/Inspection Total Cost = Estimated Cost $8,000 $190,000 $12,000 $210,000 Funding Source Gas Tax Gas Tax Gas Tax ALGACAZA Page 181 CAPITAL PROJECT DESCRIPTION CIRCULATION SYSTEM TRAFFIC SIGNALS - AVIARA PARKWAY (POINSETTIA LANE TO EL CAMINO REAL) PROJECT NAME 33692 & 33693 PROJECT NO. PROJECT LOCATION MAP:PROJECT LOCATION: At various intersections on Aviara Parkway between Poinsettia Lane and El Camino Real. PROJECT DESCRIPTION: Construct traffic signals and/or make minor drainage improvements to the following intersections with Aviara Parkway: 1. Nightshade Road - Traffic Signal 2. Tohee Lane - Traffic Signal PROJECT NEED: Signals needed to comply with Growth Management Standards. Traffic signals will be installed when they are warranted. Minor street improvements are needed to accommodate street drainage. Improvements will be constructed when Aviara Parkway is extended north of Poinsettia Lane. FINANCING: Purpose Desig n/Construction Design/Construction Total Cost = Estimated Cost Funding Source $260,000 $100,000 $360,000 Other GCC Original project cost estimated at $1,123,000. $763,000 expended in previous years for construction of existing traffic signals along Aviara Parkway. AVIATSIG.doc Page 182 CAPITAL PROJECT DESCRIPTION NONE CIRCULATION SYSTEM TRAFFIC SIGNALS - AVIARA PARKWAY AND CAMINO DE LAS ONDAS PROJECT NO. PROJECT NAME PROJECT LOCATION MAP:PROJECT LOCATION: Aviara Parkway and Camino de las Ondas. PROJECT DESCRIPTION: Installation of a fully-actuated traffic signal and appurtenant striping and signage. Developer of North Coast Calvary Chapel (MS 04-02) will design and construct signal and may apply for reimbursement of half the cost pursuant to a development condition for the project. PROJECT NEED: Required to provide safe ingress and egress to the Mariner's Point and North Coast Calvary Chapel developments. FINANCING: Purpose Construction (Reimb.) Total Cost = Estimated Cost $105,000 $105,000 Funding Source GCC Aviara Ondas Page 183 CAPITAL PROJECT DESCRIPTION NONE CIRCULATION SYSTEM TRAFFIC SIGNALS - CALLE BARCELONA AND PASEO AVELLANO PROJECT NAME PROJECT NO. PROJECT LOCATION MAP:PROJECT LOCATION: Intersection of Calle Barcelona and Paseo Avellano. PROJECT DESCRIPTION: Installation of a four-leg, fully actuated traffic signal, including a type 170 controller, 200SA local intersection control program, video detection, battery back-up system, appurtenant signing and striping, and signal interconnect to adjacent controllers. PROJECT NEED: A Caltrans traffic signal warrant has been met. The intersection is listed on the Traffic Signal Qualification List of the City's 2004 Traffic Signal Evaluation Policy. The installation of this traffic signal will assign the right-of-way for both motorists and pedestrians entering and crossing at this intersection. FINANCING: Purpose Design Construction Admin/Inspection Total Cost = Estimated Cost $8,000 $190,000 $12,000 $210,000 Funding Source GCC GCC GCC CALLEBARC Page 184 CAPITAL PROJECT DESCRIPTION CIRCULATION SYSTEM TRAFFIC SIGNALS - CAMINO DE LOS COCHES AND CALLE ACERVO PROJECT NAME o 39161 PROJECT NO. PROJECT LOCATION MAP:PROJECT LOCATION: At the intersection of Camino De Los Coches and Calle Acervo. PROJECT DESCRIPTION: Installation of a three-leg, fully-actuated traffic signal, including a Type 170E controller, 200SA local intersection control program, video detection, battery back-up system, appurtenant signing and striping, and signal interconnect to adjacent controllers at Camino De Los Coches and La Costa Canyon High School Driveway and Camino De Los Coches and Rancho Santa Fe Road. PROJECT NEED: This intersection meets two of the eleven Caltrans Traffic Signal Warrants (Warrant #9, Four Hour Volume, and Warrant #11, Peak Hour Volume). There have been four accidents in a 12-month period ending March 2003. Caltrans considers five accidents or more during a 12-month period to be significant. FINANCING: Purpose Design Construction Admin/Inspection Total Cost = Estimated Cost $8,000 $161,000 $21,000 $190,000 Funding Source GCC GCC GCC Annual Operating Cost = $5,000 CDLC CA Page 185 CAPITAL PROJECT DESCRIPTION NONE CIRCULATION SYSTEM TRAFFIC SIGNALS - CAMINO DE LOS COCHES AND LA COSTA AVENUE PROJECT NAME PROJECT NO. PROJECT LOCATION MAP:PROJECT LOCATION: Intersection of Camino de los Coches and La Costa Avenue. PROJECT DESCRIPTION: Installation of a four-leg, fully actuated traffic signal, including a type 170 controller, 200SA local intersection control program, video detection, battery back-up system, appurtenant signing and striping, and signal interconnect to adjacent controllers. PROJECT NEED: Needed to comply with Growth Management Standards. Installation will occur when traffic signal warrants are met. The installation of this traffic signal will assign the right-of-way for both motorists and pedestrians entering and crossing at the intersection. FINANCING: Purpose Design Construction Admin/Inspection Total Cost = Estimated Cost Funding Source $8,000 $165,000 $12,000 $185,000 PFF PFF PFF CAMINODE Page 186 CAPITAL PROJECT DESCRIPTION NONE CIRCULATION SYSTEM TRAFFIC SIGNALS - CAMINO VIDA ROBLE AND YARROW DRIVE PROJECT NO PROJECT NAME PROJECT LOCATION MAP:PROJECT LOCATION: Intersection of Camino Vida Roble and Yarrow Drive. PROJECT DESCRIPTION: Installation of a three-leg, fully actuated traffic signal, including a type 170 controller, 200SA local intersection control program, video detection, battery back-up system, appurtenant signing and striping, and signal interconnect to adjacent controllers. PROJECT NEED: Needed to comply with Growth Management Standards and traffic signal warrants. Installation will occur when traffic signal warrants are met. The installation of this traffic signal will assign the right-of-way for both motorists and pedestrians entering and crossing at the intersection. FINANCING: Purpose Design Construction Admin/Inspection Total Cost = Estimated Cost Funding Source $8,000 $165,000 $12,000 $185,000 PFF PFF PFF CAMINOYA Page 187 CAPITAL PROJECT DESCRIPTION 39021 CIRCULATION SYSTEM TRAFFIC SIGNALS - CANNON ROAD AND AVENIDA ENCINAS PROJECT NO PROJECT NAME PROJECT LOCATION MAP:PROJECT LOCATION: Intersection of Cannon Road and Avenida Encinas, immediately west of Interstate 5. PROJECT DESCRIPTION: Installation of a 5-phase, fully actuated traffic signal, including a Type 170 controller, 176 intersection control program and minor intersection improvements. PROJECT NEED: Needed to comply with Growth Management Standards. Installation will occur when traffic signal warrants are met. FINANCING: Purpose Estimated Cost Funding Source Design/Construction $150,000 PFF Total Cost = $150,000 CANNON1 Page 188 CAPITAL PROJECT DESCRIPTION NONE CIRCULATION SYSTEM TRAFFIC SIGNALS - CANNON ROAD AND COLLEGE BOULEVARD PROJECT NO PROJECT NAME PROJECT LOCATION MAP: 7—-/LAKE c^-7 CALAVERA PROJECT LOCATION: Intersection of Cannon Road and College Boulevard. PROJECT DESCRIPTION: Installation of a four-leg, fully actuated traffic signal, including a type 170 controller, 200SA local intersection control program, video detection, battery back-up system, appurtenant signing and striping, and signal interconnect to adjacent controllers. PROJECT NEED: Needed to comply with Growth Management Standards. Installation will occur when traffic signal warrants are met. The installation of this traffic signal will assign the right-of-way for both motorists and pedestrians entering and crossing at the intersection. FINANCING: Purpose Design Construction Admin/Inspection Total Cost = Estimated Cost Funding Source $8,000 $190,000 $12,000 $210,000 PFF PFF PFF CANNON2 Page 189 CAPITAL PROJECT DESCRIPTION CIRCULATION SYSTEM TRAFFIC SIGNALS - CARLSBAD BOULEVARD AND TAMARACK AVENUE SIGNAL REPAIRS PROJECT NAME NONE PROJECT NO. PROJECT LOCATION MAP:PROJECT LOCATION: Carlsbad Boulevard and Tamarack Avenue. PROJECT DESCRIPTION: Remove and replace all traffic signal equipment including signal controller/cabinet, signal poles and mast arms, vehicle and signal indications, conduit and conductors. Existing electrical service cabinet is adequate and does not need to be replaced. Install video detection and UPS battery back-up systems. PROJECT NEED: Due to age of equipment and proximity to ocean, the existing signal equipment is badly corroded and in need of replacement. Underground conduit is corroded and overfilled, making repair/maintenance work difficult. FINANCING: Purpose Design Construction Admin/Inspection Total Cost = Estimated Cost $5,000 $201,500 $23,500 $230,000 Funding Source IRF IRF IRF Cbad Tam Page 190 CAPITAL PROJECT DESCRIPTION 38461 CIRCULATION SYSTEM TRAFFIC SIGNALS - CARLSBAD BOULEVARD AND CHERRY AVENUE PROJECT NO PROJECT NAME PROJECT LOCATION MAP: PROJECT SITE PROJECT LOCATION: Intersection of Carlsbad Boulevard and Cherry Avenue. PROJECT DESCRIPTION: Installation of a three-leg, fully actuated traffic signal, including a type 170 controller, 200SA local intersection control program, video detection, battery back-up system, appurtenant signing and striping, and signal interconnect to adjacent controllers. PROJECT NEED: Caltrans traffic signal warrants have been met. The intersection is listed on the qualification list of the City's Traffic Signal Evaluation Policy. The installation of this traffic signal will assign the right-of-way for both motorists and pedestrians entering and crossing at the intersection. FINANCING: Purpose Design Construction Admin/Inspection Total Cost = Estimated Cost Funding Source $8,000 $165,000 $12,000 $185,000 GCC GCC GCC CBCherry Page 191 CAPITAL PROJECT DESCRIPTION 39171 CIRCULATION SYSTEM TRAFFIC SIGNALS - CARLSBAD VILLAGE DRIVE AND GLASGOW DRIVE PROJECT NO PROJECT NAME PROJECT LOCATION MAP:PROJECT LOCATION: At the intersection of Carlsbad Village Drive and Glasgow Drive. PROJECT DESCRIPTION: Installation of a four-leg, fully-actuated traffic signal, including a Type 170E controller, 200SA local intersection control program, video detection, battery back-up system, appurtenant signing and striping, and signal interconnect to adjacent controllers at Carlsbad Village Drive (CVD) and Tamarack Avenue and Carlsbad Village Drive and College Boulevard. PROJECT NEED: The adjacent intersection to the west (CVD/Tamarack) is currently signalized and the adjacent intersection to the east (CVD/College) will be signalized upon the completion of College Boulevard south of CVD. Due to the increase in vehicular volume, Caltrans Traffic Signal Warrant #7 (Systems Warrant) is projected to be satisfied after the aforementioned extension of College Boulevard. FINANCING: Purpose Design Construction Admin/Inspection Total Cost = Estimated Cost $8,000 $180,000 $22,000 $210,000 Funding Source GCC GCC GCC Annual Operating Cost: $5,000 CVD_glas Page 192 CAPITAL PROJECT DESCRIPTION NONE CIRCULATION SYSTEM TRAFFIC SIGNALS - COLLEGE BOULEVARD AND CARLSBAD VILLAGE DRIVE PROJECT NO. PROJECT NAME PROJECT LOCATION MAP:PROJECT LOCATION: Intersection of College Boulevard and Carlsbad Village Drive. PROJECT DESCRIPTION: Installation of a four-leg, fully actuated traffic signal, including a type 170 controller, 200SA local intersection control program, video detection, battery back-up system, appurtenant signing and striping, and signal interconnect to adjacent controllers. PROJECT NEED: Needed to comply with Growth Management Standards. Installation will occur when traffic signal warrants are met. The installation of this traffic signal will assign the right-of-way for both motorists and pedestrians entering and crossing at the intersection. FINANCING: Purpose Design Construction Admin/Inspection Total Cost = Estimated Cost Funding Source $8,000 $190,000 $12,000 $210,000 PFF PFF PFF COL CVD Page 193 CAPITAL PROJECT DESCRIPTION CIRCULATION SYSTEM TRAFFIC SIGNALS - EL CAMINO REAL / PLAZA DRIVE / MARRON ROAD / HOSP WAY PROJECT NAME 38991 PROJECT NO. PROJECT LOCATION MAP: SIGNAL PROJECT LOCATION: Signalized intersections of El Camino Real and Plaza Drive, El Camino Real and Marron Road, and El Camino Real and Hosp Way. PROJECT DESCRIPTION: Design and rebuild existing signalized intersections to include all signal appurtenances and to meet ADA requirements. Repair concrete and rebuild a portion of Marron Road east of El Camino Real. PROJECT NEED: Underground signal facilities at this location have deteriorated to the point where conductors can no longer be pulled through the system. This project will reduce the need for future maintenance and restore the ability for maintenance crews to make future repairs should equipment become damaged or malfunction. Pull boxes and signal poles require location for installation of ADA pedestrian ramps. Replacing a cross-gutter in Marron Road will improve the driving conditions. FINANCING: Purpose Design Construction Total Cost = Estimated Cost $70,000 $1,241,000 $1,311,000 Funding Source TransNet-Local TransNet-Local ECRREHAB Page 194 CAPITAL PROJECT DESCRIPTION CIRCULATION SYSTEM TRAFFIC SIGNALS - EL CAMINO REAL AND CHESTNUT AVENUE SIGNAL REPAIRS PROJECT NAME NONE PROJECT NO. PROJECT LOCATION MAP: HWY 78 PROJECT LOCATION: El Camino Real and Chestnut Avenue. PROJECT DESCRIPTION: Remove and replace all traffic signal equipment including signal controller/cabinet, electrical service enclosure, vehicle and signal indications, conduit and conductors. Install video detection and UPS battery back-up systems. Minor sidewalk repairs on northeast (including retaining wall) and southeast corners to provide minimum pedestrian clearance per ADA requirements. Existing poles/mast arms to remain. PROJECT NEED: Due to age of equipment, the existing signal equipment is badly corroded and in need of replacement. Underground conduit is corroded and overfilled, making repair/maintenance work difficult and also needs to be replaced. FINANCING: Purpose Design Construction Admin/Inspection Total Cost = Estimated Cost Funding Source $20,000 $167,500 $18,500 $206,000 IRF IRF IRF ECR_Chest Page 195 CAPITAL PROJECT DESCRIPTION CIRCULATION SYSTEM TRAFFIC SIGNALS - EL CAMINO REAL AND POINSETTIA LANE PROJECT NAME 38001 PROJECT NO. PROJECT LOCATION MAP:PROJECT LOCATION: Intersection of El Camino Real and Poinsettia Lane. PROJECT DESCRIPTION: Installation of a four-leg, fully actuated traffic signal, including a type 170 controller, 200SA local intersection control program, video detection, battery back-up system, appurtenant signing and striping, and signal interconnect to adjacent controllers. PROJECT NEED: Needed to comply with Growth Management Standards. The installation of this traffic signal will assign the right-of-way for both motorists and pedestrians entering and crossing at the intersection. FINANCING: Purpose Design Construction Admin/Inspection Total Cost = Estimated Cost Funding Source $8,000 $180,000 $16,250 $204,250 PFF PFF PFF ECR3 Page 196 CAPITAL PROJECT DESCRIPTION CIRCULATION SYSTEM TRAFFIC SIGNALS - EL CAMINO REAL AND TAMARACK AVENUE SIGNAL REPAIRS PROJECT NAME NONE PROJECT NO. PROJECT LOCATION MAP: PROJECT SITE PROJECT LOCATION: El Camino Real and Tamarack Avenue. PROJECT DESCRIPTION: Remove and replace all underground conduit, conductors and pull boxes. Install video detection system and UPS battery back-up system. PROJECT NEED: Due to age of equipment, underground conduit is corroded and overfilled, making repairs/maintenance work difficult. Video detection and battery back-up system will be installed to bring signal operations up-to-date. FINANCING: Purpose Design Construction Admin/Inspection Total Cost = Estimated Cost Funding Source $4,000 $122,400 $14,600 $141,000 IRF IRF IRF ECR Tarn Page 197 CAPITAL PROJECT DESCRIPTION NONE CIRCULATION SYSTEM TRAFFIC SIGNALS - FARADAY AVENUE AND CAMINO HILLS DRIVE PROJECT NO PROJECT NAME PROJECT LOCATION MAP:PROJECT LOCATION: Intersection of Faraday Avenue and Camino Hills Drive. PROJECT DESCRIPTION: Installation of a three-leg, fully actuated traffic signal, including a type 170 controller, 200SA local intersection control program, video detection, battery back-up system, appurtenant signing and striping, and signal interconnect to adjacent controllers. PROJECT NEED: A Caltrans traffic signal warrant has been met. The intersection is listed on the Traffic Signal Qualification List of the City's 2004 Traffic Signal Evaluation Policy. The installation of this traffic signal will assign the right-of-way for both motorists and pedestrians entering and crossing at this intersection. FINANCING: Purpose Design Construction Admin/Inspection Total Cost = Estimated Cost $8,000 $165,000 $12,000 $185,000 Funding Source GCC GCC GCC Faraday Page 198 CAPITAL PROJECT DESCRIPTION NONE CIRCULATION SYSTEM TRAFFIC SIGNALS - FARADAY AVENUE AND ORION STREET PROJECT NO PROJECT NAME PROJECT LOCATION MAP:PROJECT LOCATION: At the intersection of the above named streets. PROJECT DESCRIPTION: Installation of a four-leg, fully actuated traffic signal, including a type 170 controller, 200SA local intersection control program, video detection, battery back-up system, appurtenant signing and striping, and signal interconnect to adjacent controllers. PROJECT NEED: Needed to comply with Growth Management Standards. The installation of this traffic signal will assign the right-of-way for both motorists and pedestrians entering and crossing at the intersection. FINANCING: Purpose Design Construction Admin/Inspection Total Cost = Estimated Cost Funding Source $8,000 $190,000 $12,000 $210,000 TIP TIP TIP FARAORIO Page 199 CAPITAL PROJECT DESCRIPTION 36211 CIRCULATION SYSTEM TRAFFIC SIGNALS - FARADAY AVENUE AND PRIESTLY DRIVE PROJECT NO PROJECT NAME PROJECT LOCATION MAP:PROJECT LOCATION: At the intersection of Faraday Avenue and Priestly Drive. PROJECT DESCRIPTION: Installation of a three-leg, fully actuated traffic signal, including a type 170 controller, 200SA local intersection control program, video detection, battery back-up system, appurtenant signing and striping, and signal interconnect to adjacent controllers. PROJECT NEED: Caltrans signal warrants have been met. The intersection is listed on the qualification list of the City's Traffic Signal Evaluation Policy. The installation of this traffic signal will assign the right-of-way for both motorists and pedestrians entering and crossing at the intersection. FINANCING: Purpose Design Construction Admin/Inspection Total Cost = Estimated Cost $8,000 $180,000 $22,000 $210,000 Funding Source Gas Tax Gas Tax Gas Tax FDYPRIES Page 200 CAPITAL PROJECT DESCRIPTION NONE CIRCULATION SYSTEM TRAFFIC SIGNALS - FARADAY AVENUE AND RUTHERFORD ROAD PROJECT NO. PROJECT NAME PROJECT LOCATION MAP:PROJECT LOCATION: At the intersection of Faraday Avenue and Rutherford Road. PROJECT DESCRIPTION: Installation of a four-leg, fully actuated traffic signal, including a type 170 controller, 200SA local intersection control program, video detection, battery back-up system, appurtenant signing and striping, and signal interconnect to adjacent controllers. PROJECT NEED: Caltrans traffic signal warrants have been met. The intersection is listed on the qualification list of the City's Traffic Signal Evaluation Policy. The installation of this traffic signal will assign the right-of-way for both motorists and pedestrians entering and crossing at the intersection. FINANCING: Purpose Design Construction Admin/Inspection Total Cost = Estimated Cost Funding Source $8,000 $165,000 $12,000 $185,000 GCC GCC GCC Faruthfd Page 201 CAPITAL PROJECT DESCRIPTION CIRCULATION SYSTEM TRAFFIC SIGNALS - LA COSTA AVENUE AND ESFERA STREET PROJECT NAME NONE PROJECT NO. PROJECT LOCATION MAP:PROJECT LOCATION: La Costa Avenue and Esfera Street. PROJECT DESCRIPTION: Installation of a three-leg, fully actuated traffic signal, including a type 170 controller, 200SA local intersection control program, video detection, battery back-up system, appurtenant signing and striping, and signal interconnect to adjacent controllers. PROJECT NEED: The installation of this traffic signal will assign the right-of-way for both motorists and pedestrians entering and crossing at the intersection. FINANCING: Purpose Design Construction Admin/Inspection Total Cost = Estimated Cost $8,000 $170,000 $12,000 $190,000 Funding Source GCC GCC GCC La_costa Page 202 CAPITAL PROJECT DESCRIPTION 39381 CIRCULATION SYSTEM TRAFFIC SIGNALS - LA COSTA AVENUE AND LEVANTE STREET PROJECT NO PROJECT NAME PROJECT LOCATION MAP:PROJECT LOCATION: La Costa Avenue and Levante Street. PROJECT DESCRIPTION: Installation of a three-leg, fully actuated traffic signal, including a type 170 controller, 200SA local intersection control program, video detection, battery back-up system, appurtenant signing and striping, and signal interconnect to adjacent controllers. PROJECT NEED: The installation of this traffic signal will assign the right-of-way for both motorists and pedestrians entering and crossing at the intersection. FINANCING: Purpose Design Construction Admin/Inspection Total Cost = Estimated Cost $8,000 $180,000 $22,000 $210,000 Funding Source GCC GCC GCC Lacosta_2 Page 203 CAPITAL PROJECT DESCRIPTION NONE CIRCULATION SYSTEM TRAFFIC SIGNALS - LA COSTA AVENUE AND NUEVA CASTILLA WAY PROJECT NO. PROJECT NAME PROJECT LOCATION MAP:PROJECT LOCATION: Intersection of La Costa Avenue and Nueva Castilla Way. PROJECT DESCRIPTION: Installation of a four-leg, fully actuated traffic signal, including a type 170 controller, 200SA local intersection control program, video detection, battery back-up system, appurtenant signing and striping, and signal interconnect to adjacent controllers. PROJECT NEED: Caltrans traffic signal warrants have been met. The intersection is listed on the qualification list of the City's Traffic Signal Evaluation Policy. The installation of this traffic signal will assign the right-of-way for both motorists and pedestrians entering and crossing at the intersection. FINANCING: Purpose Design Construction Admin/Inspection Total Cost = Estimated Cost Funding Source $8,000 $165,000 $12,000 $185,000 GCC GCC GCC LCANueva Page 204 CAPITAL PROJECT DESCRIPTION NONE CIRCULATION SYSTEM TRAFFIC SIGNALS - MELROSE DRIVE AND LA COSTA AVENUE PROJECT NO PROJECT NAME PROJECT LOCATION MAP:PROJECT LOCATION: Intersection of Melrose Drive and La Costa Avenue. PROJECT DESCRIPTION: Installation of a four-leg, fully actuated traffic signal, including a type 170 controller, 200SA local intersection control program, video detection, battery back-up system, appurtenant signing and striping, and signal interconnect to adjacent controllers. PROJECT NEED: Needed to comply with Growth Management Standards. The installation of this traffic signal will assign the right-of-way for both motorists and pedestrians entering and crossing at the intersection. FINANCING: Purpose Design Construction Admin/Inspection Total Cost = Estimated Cost Funding Source $8,000 $165,000 $12,000 $185,000 PFF PFF PFF MELROSE Page 205 CAPITAL PROJECT DESCRIPTION CIRCULATION SYSTEM TRAFFIC SIGNALS - MONROE STREET AND HOSP WAY PROJECT NAME NONE PROJECT NO. PROJECT LOCATION MAP:PROJECT LOCATION: Intersection of Monroe Street and Hosp Way. PROJECT DESCRIPTION: Installation of a four-leg, fully actuated traffic signal, including a type 170 controller, 200SA local intersection control program, video detection, battery back-up system, appurtenant signing and striping, and signal interconnect to adjacent controllers. PROJECT NEED: A Caltrans traffic signal warrant has been met. The intersection is listed on the Traffic Signal Qualification List of the City's 2004 Traffic Signal Evaluation Policy. The installation of this traffic signal will assign the right-of-way for both motorists and pedestrians entering and crossing at this intersection. FINANCING: Purpose Design Construction Admin/Inspection Total Cost = Estimated Cost $8,000 $190,000 $12,000 $210,000 Funding Source GCC GCC GCC Monroe Page 206 CAPITAL PROJECT DESCRIPTION 36441 CIRCULATION SYSTEM TRAFFIC SIGNALS - PALOMAR AIRPORT ROAD AND MELROSE DRIVE PROJECT NAME PROJECT NO. PROJECT LOCATION MAP:PROJECT LOCATION: Intersection of Palomar Airport Road and Melrose Drive. PROJECT DESCRIPTION: Installation of an 8-phase, fully actuated traffic signal, including a Type 170 controller and 176 intersection control program. Modify existing traffic signal to accommodate construction of north leg of Melrose Avenue. PROJECT NEED: Needed to comply with Growth Management Standards. FINANCING: Estimated Cost Funding SourcePurpose Design/Construction Admin/Inspection Total Cost = $200,000 $50,000 $250,000 PFF PFF PARMELRO Page 207 CAPITAL PROJECT DESCRIPTION 39351 CIRCULATION SYSTEM TRAFFIC SIGNALS - PASEO DEL NORTE AND CAR COUNTRY DRIVE PROJECT NO PROJECT NAME PROJECT LOCATION MAP: \ PROJECT LOCATION: At the intersection of Paseo Del Norte and Car Country Drive. PROJECT DESCRIPTION: Installation of a three-leg, fully actuated traffic signal, including a type 170 controller, 200SA local intersection control program, video detection, battery back-up system, appurtenant signing and striping, and signal interconnect to adjacent controllers. PROJECT NEED: Caltrans signal warrants have been met. The intersection is listed on the qualification list of the City's 2004 Traffic Signal Evaluation Policy. The installation of this traffic signal will assign the right-of-way for both motorists and pedestrians entering and crossing at the intersection. FINANCING: Purpose Design Construction Admin/Inspection Total Cost = Annual Operating Cost: = $5,000 Estimated Cost $8,000 $180,000 $22,000 $210,000 Funding Source Gas Tax Gas Tax Gas Tax PDN_CCDR Page 208 CAPITAL PROJECT DESCRIPTION 39391 CIRCULATION SYSTEM TRAFFIC SIGNALS - POINSETTIA LANE AND BLACK RAIL ROAD PROJECT NO. PROJECT NAME PROJECT LOCATION MAP:PROJECT LOCATION: At the intersection of Poinsettia Lane and Black Rail Road. PROJECT DESCRIPTION: Installation of a four-leg, fully actuated traffic signal, including a type 170 controller, 200SA local intersection control program, video detection, battery back-up system, appurtenant signing and striping, and signal interconnect to adjacent controllers at Poinsettia Lane and Aviara Parkway and Poinsettia Lane and Ambrosia Lane. PROJECT NEED: Future traffic on Poinsettia Lane will increase once the roadway extends from its current terminus at Black Rail Road eastward to El Camino Real, thereby necessitating the installation of a traffic signal at this location. The installation of this traffic signal will assign the right-of-way for both motorists and pedestrians entering and crossing at the intersection. FINANCING: Purpose Design Construction Admin/Inspection Estimated Cost $8,000 $180,000 $22,000 Funding Source GCC GCC GCC Total Cost = Annual Operating Cost: = $5,000 $210,000 Poin_brr Page 209 CAPITAL PROJECT DESCRIPTION NONE CIRCULATION SYSTEM TRAFFIC SIGNALS - POINSETTIA LANE AND BRIGANTINE ROAD PROJECT NO PROJECT NAME PROJECT LOCATION MAP:PROJECT LOCATION: Intersection of Poinsettia Lane and Brigantine Road. PROJECT DESCRIPTION: Installation of a three-leg, fully actuated traffic signal, including a type 170 controller, 200SA local intersection control program, video detection, battery back-up system, appurtenant signing and striping, and signal interconnect to adjacent controllers. PROJECT NEED: Required to accommodate the safe and efficient flow of traffic from Brigantine Drive onto Poinsettia Lane which is classified as a major arterial in the City's Circulation Element. The need for the signal is created by the development of adjacent properties. Early developing properties which do not trigger the construction of the signal are required to contribute a fair share contribution of the total cost to install the traffic signal. FINANCING: Purpose Design Construction Admin/Inspection Total Cost = Estimated Cost $8,000 $165,000 $12,000 $185,000 Funding Source GCC GCC GCC Poin_brig Page 210 CAPITAL PROJECT DESCRIPTION 39461 CIRCULATION SYSTEM TRAFFIC SIGNALS - POINSETTIA LANE AND EL FUERTE STREET PROJECT NO PROJECT NAME PROJECT LOCATION MAP:PROJECT LOCATION: Intersection of Poinsettia Lane and El Fuerte Street. PROJECT DESCRIPTION: Installation of a four-leg, fully actuated traffic signal, including a type 170 controller, 200SA local intersection control program, video detection, battery back-up system, appurtenant signing and striping, and signal interconnect to adjacent controllers. PROJECT NEED: Needed to comply with Growth Management Standards. The installation of this traffic signal will assign the right-of-way for both motorists and pedestrians entering and crossing at the intersection. FINANCING: Purpose Design Construction Admin/Inspection Estimated Cost Funding Source $8,000 $180,000 $22,000 PFF PFF PFF Total Cost = $210,000 Annual Operating Cost: = $5,000 POINSET1 Page 211 CAPITAL PROJECT DESCRIPTION 38821 CIRCULATION SYSTEM TRAFFIC SIGNALS - POINSETTIA LANE AND SNAPDRAGON DRIVE PROJECT NO PROJECT NAME PROJECT LOCATION MAP: SIGNAL PROJECT LOCATION: At the intersection of Poinsettia Lane and Snapdragon Drive. PROJECT DESCRIPTION: Installation of a three-leg, fully actuated traffic signal, including a type 170 controller, 200SA local intersection control program, video detection, battery back-up system, appurtenant signing and striping, and signal interconnect to adjacent controllers. PROJECT NEED: Caltrans signal warrants have been met. The intersection is listed on the qualification list of the City's 2004 Traffic Signal Evaluation Policy. The installation of this traffic signal will assign the right-of-way for both motorists and pedestrians entering and crossing at the intersection. FINANCING: Purpose Design Construction Admin/Inspection Estimated Cost $8,000 $170,000 $12,000 Funding Source Gas Tax Gas Tax Gas Tax Total Cost = Annual Operating Cost: = $5,000 $190,000 POINSNAP Page 212 CAPITAL PROJECT DESCRIPTION CIRCULATION SYSTEM TRAFFIC SIGNALS - RANCHO SANTA FE ROAD AND CALLE JUNIPERO (FORMERLY MELROSE DRIVE SOUTH) PROJECT NAME NONE PROJECT NO. PROJECT LOCATION MAP:PROJECT LOCATION: Intersection of Rancho Santa Fe Road and future Calle Junipero, formerly Melrose Drive South. PROJECT DESCRIPTION: Installation of a three-leg, fully actuated traffic signal, including a type 170 controller, 200SA local intersection control program, video detection, battery back-up system, appurtenant signing and striping, and signal interconnect to adjacent controllers. PROJECT NEED: Needed to comply with Growth Management Standards. The installation of this traffic signal will assign the right-of-way for both motorists and pedestrians entering and crossing at the intersection. FINANCING: Purpose Design Construction Admin/Inspection Total Cost = Estimated Cost Funding Source $8,000 $190,000 $12,000 $210,000 PFF PFF PFF RSFMELRO Page 213 CAPITAL PROJECT DESCRIPTION CIRCULATION SYSTEM TRAFFIC SIGNALS - RANCHO SANTA FE ROAD AND SAN EL1JO ROAD (FORMERLY QUESTHAVEN ROAD) PROJECT NAME 34061 PROJECT NO. PROJECT LOCATION MAP:PROJECT LOCATION: Intersection of Rancho Santa Fe Road and San Elijo Road, formerly Questhaven Road. PROJECT DESCRIPTION: Installation of a three-leg, fully actuated traffic signal, including a type 170 controller, 200SA local intersection control program, video detection, battery back-up system, appurtenant signing and striping, and signal interconnect to adjacent controllers. The City of San Marcos is responsible for 1/3 share of this signal. Staff will pursue a cost sharing agreement with the City of San Marcos. PROJECT NEED: Needed to comply with Growth Management Standards. The installation of this traffic signal will assign the right-of-way for both motorists and pedestrians entering and crossing at the intersection. FINANCING: Purpose Construction Total Cost = Estimated Cost $125,000 $125,000 Funding Source GCC RSFQUEST Page 214 CAPITAL PROJECT DESCRIPTION 39401 CIRCULATION SYSTEM TRAFFIC SIGNALS - TAMARACK AVENUE AND PONTIAC DRIVE PROJECT NO PROJECT NAME PROJECT LOCATION MAP:PROJECT LOCATION: Intersection of Tamarack Avenue and Pontiac Drive. PROJECT DESCRIPTION: Installation of a three-leg, fully actuated traffic signal, including a type 170 controller, 200SA local intersection control program, video detection, battery back-up system, appurtenant signing and striping, and signal interconnect to adjacent controllers. PROJECT NEED: A Caltrans traffic signal warrant has been met. The intersection is listed on the Traffic Signal Qualification List of the City's 2004 Traffic Signal Evaluation Policy. The installation of this traffic signal will assign the right-of-way for both motorists and pedestrians entering and crossing at this intersection. FINANCING: Purpose Design Construction Admin/Inspection Total Cost = Estimated Cost $8,000 $180,000 $22,000 $210,000 Funding Source GCC GCC GCC Annual Operating Cost = $5,000 Tam&pont Page 215 CAPITAL PROJECT DESCRIPTION NONE CIRCULATION SYSTEM TRAFFIC SIGNALS - TAMARACK AVENUE AND VALLEY STREET PROJECT NO PROJECT NAME PROJECT LOCATION MAP:PROJECT LOCATION: Intersection of Tamarack Avenue and Valley Street. PROJECT DESCRIPTION: Installation of a four-leg, fully actuated traffic signal, including a type 170 controller, 200SA local intersection control program, video detection, battery back-up system, appurtenant signing and striping, and signal interconnect to adjacent controllers. PROJECT NEED: A Caltrans traffic signal warrant has been met. The intersection is listed on the Traffic Signal Qualification List of the City's 2004 Traffic Signal Evaluation Policy. The installation of this traffic signal will assign the right-of-way for both motorists and pedestrians entering and crossing at this intersection. This is an elementary school pedestrian crossing. FINANCING: Purpose Design Construction Admin/Inspection Total Cost = Estimated Cost $8,000 $165,000 $12,000 $185,000 Funding Source GCC GCC GCC Tarn vail Page 216 CAPITAL PROJECT DESCRIPTION NONE CIRCULATION SYSTEM TRAFFIC SIGNALS - TAMARACK AVENUE AND GARFIELD STREET PROJECT NO PROJECT NAME PROJECT LOCATION MAP:PROJECT LOCATION: Intersection of Tamarack Avenue and Garfield Street. PROJECT DESCRIPTION: Installation of a four-leg, fully actuated traffic signal, including a type 170 controller, 200SA local intersection control program, video detection, battery back-up system, appurtenant signing and striping, and signal interconnect to adjacent controllers. PROJECT NEED: Needed to meet Growth Management Standards and future traffic signal warrants. The installation of this traffic signal will assign'the right-of-way for both motorists and pedestrians entering and crossing at the intersection. FINANCING: Purpose Design Construction Admin/Inspection Total Cost = Estimated Cost Funding Source $8,000 $190,000 $12,000 $210,000 PFF PFF PFF TAMGAR Page 217 CAPITAL PROJECT DESCRIPTION CIRCULATION SYSTEM TRAFFIC SIGNALS - VIDEO DETECTION CONVERSION PROJECT NAME NONE PROJECT NO. PROJECT LOCATION MAP: N/A PROJECT LOCATION: Citywide. PROJECT DESCRIPTION: Convert existing traffic signal with video detection equipment along streets included in the Pavement Management Program projects. PROJECT NEED: Traffic signals are being converted to Video Detection to minimize impacts during future construction projects and to eliminate the cost associated with future loop replacements. FINANCING: Purpose Construction Total Cost = Estimated Cost $1,850,000 $1,850,000 Funding Source Gas Tax VIDEODET Page 218 STREET PROJECTS FUNDING MATRIX FOR STREET PROJECTS PROJ NO. 39221 31842 38141 39471 38541 39191 35571 36362 38791 36071 36431 39091 39201 39571 39291 36222 35931 38111 NEW 36671 36791 38681 36892 38601 PROJECT TITLE AVENIDA ENCINAS WIDENING - SOUTH OF PALOMAR AIRPORT ROAD BTD#2/POINSETTIA LANE - REACH E (PARTIAL FUNDING) BTD#2/POINSETTIA LANE - REACHES A,B,C,F,G & AVIARA PKWY REIMB BTD#3 CANNON ROAD - FROST TO FARADAY (REIMB.) CANNON ROAD REACH 4B CARLSBAD BLVD. AT BREAKWATER ROAD - LEFT TURN LANE CARLSBAD BLVD. AT STATE ST - INTERSECTION ENHANCEMENT DESIGN CARLSBAD BLVD. AT STATE ST - INTERSECTION ENHANCEMENT DESIGN CARLSBAD BOULEVARD ENCINAS CREEK BRIDGE REPLACEMENT CARLSBAD BOULEVARD ENCINAS CREEK BRIDGE REPLACEMENT CARLSBAD BOULEVARD MEDIAN-TAMARACK AVENUE TO PINE AVENUE CARLSBAD BOULEVARD RETROFIT OVER SDNR CARLSBAD BOULEVARD WIDENING - CANNON TO MANZANO CARLSBAD VILLAGE DRIVE WIDENING COLLEGE BLVD REACH A AND CANNON REACH 4A COLLEGE/CANNON ASSESSMENT DISTRICT EL CAMINO REAL AND CARLSBAD VILLAGE DRIVE EL CAMINO REAL AND FARADAY AVENUE EL CAMINO REAL AT AVIARA PARKWAY/ALGA ROAD EL CAMINO REAL MEDIANS EL CAMINO REAL MEDIANS - LA COSTA EL CAMINO REAL WIDENING - LA COSTA AVENUE TO ARENAL ROAD EL CAMINO REAL WIDENING - LISA STREET TO CRESTVIEW DR (LOAN) EL CAMINO REAL WIDENING - NORTH OF COUGAR DRIVE (LOAN) EL CAMINO REAL WIDENING - TAMARACK AVENUE TO CHESTNUT AVE. EL CAMINO REAL WIDENING - S CHESTNUT/S ALGA FARADAY AVENUE AND MELROSE DRIVE EXTENSIONS FARADAY AVENUE MITIGATION - SOUTH OF CANNON I-5 AND LA COSTA AVENUE AUXILLARY LANES MELROSE DRIVE AND ALGA ROAD PALOMAR AIRPORT ROAD AND COLLEGE BOULEVARD PALOMAR AIRPORT ROAD WIDENING AT PASEO DEL NORTE PARK DRIVE, MARINA TO COVE PAVEMENT MANAGEMENT PROGRAM PAVEMENT MANAGEMENT PROGRAM PAVEMENT MANAGEMENT PROGRAM POINSETTIA LANE EAST OF EL CAMINO REAL FINANCING PROGRAM POINSETTIA LANE WIDENING (PASEO DEL NORTE TO BATIQUITOS LN) RANCHO SANTA FE ROAD AND OLIVENHAIN IMPROVEMENTS FUNDING SOURCE TIP BTD#2 BTD#2 BTD#3 TRANSNET-HWY REDVL SCCRDA GCC REDVL VILLAGE REDVL SCCRDA FED GRNT PFF TRANSNET-LOC TIF TIF OTHER OTHER TIF TIF TIF PFF PFF TIF TRANSNET-LOC TRANSNET-LOC TIF TIF OTHER CFCW1 CFD#1 TIF TIF TIF GCC TRANSNET-LOC GAS TAX OTHER OTHER TIF CFD#2 TOTAL BUDGET 983,000 9,450,000 1,320,729 6,260,226 1,761,000 243,150 105,000 100,000 41,453 1,804,000 1,398,000 1,100,000 2,260,000 1,423,000 1,713,000 10,314,481 320,000 881,000 282,000 1,869,500 90,500 508,000 959,000 493,000 1,382,708 522,115 1,021,826 5,500,000 2,000,000 542,000 160,000 525,000 145,627 56,210,348 4,701,088 11,809,000 28,932,793 2,113,000 3,800,000 FUTURE YEAR BUDGET AMOUNTS YEAR1 2005-2006 100,000 1,308,000 708,430 2,600,000 600,000 YEAR 2 2006-2007 600,000 959,000 2,500,000 800,000 YEAR 3 2007-2008 1,804,000 145,627 2,600,000 800,000 YEAR 4 2008-2009 2,648,000 952,000 YEARS 2009-2010 2,813,000 787,000 YEAR 6-10 2010-2015 983,000 320,000 282,000 508,000 160,000 14,065,000 3,935,000 78,924 BUILDOUT 2015-2020 9,100,000 1,320,729 400,000 1,398,000 2,260,000 1,423,000 960,000 2,000,000 542,000 14,065,000 3,935,000 2,113,000 Page 219 FUNDING MATRIX FOR STREET PROJECTS PROJ NO. 31906 39071 38801 39531 39281 38951 PROJECT TITLE RANCHO SANTA FE ROAD NORTH - PHASE I RANCHO SANTA FE ROAD NORTH - PHASE II (BRIDGE) RANCHO SANTA FE ROAD SOUTH SIDEWALK/STREET CONSTRUCTION PROGRAM TRAFFIC MONITORING PROGRAM UNDERGROUND DIST. 17 - ROOSEVELT STREET FUNDING SOURCE CFD#2 CFD#2 CFD#2 TIP TIP GCC TOTAL BUDGET 26,406,243 18,419,000 1,350,000 3,834,259 1,210,611 509,800 FUTURE YEAR BUDGET AMOUNTS YEAR1 2005-2006 300,000 70,000 YEAR 2 2006-2007 300,000 70,000 YEARS 2007-2008 300,000 70,000 YEAR 4 2008-2009 300,000 70,000 YEARS 2009-2010 300,000 70,000 YEAR 6-10 2010-2015 1,200,000 350,000 BUILDOUT 2015-2020 350,000 Page 220 CAPITAL PROJECT DESCRIPTION CIRCULATION SYSTEM STREET PROJECTS - AVENIDA ENCINAS WIDENING SOUTH OF PALOMAR AIRPORT ROAD PROJECT NAME NONE PROJECT NO. PROJECT LOCATION MAP:PROJECT LOCATION: Along the west side of Avenida Encinas south of Palomar Airport Road adjacent to the San Diego Northern Railway property. PROJECT DESCRIPTION: Widen the west side of Avenida Encinas to full secondary arterial standards from Palomar Airport Road to approximately 800 feet south. The work includes placement of fill material and construction of new curbs, gutters, aggregate base, asphalt paving and striping. PROJECT NEED: Required to comply with Growth Management Standards. FINANCING: Purpose Estimated Cost Funding Source Design/Construction $983,000 TIP Total Cost = $983,000 AVENIDA Page 221 CAPITAL PROJECT DESCRIPTION CIRCULATION SYSTEM STREET PROJECTS - B&TD #2 POINSETTIA LANE REACH "E" (CASSIA ROAD TO SKIMMER COURT) PROJECT NAME 39221 PROJECT NO. PROJECT LOCATION MAP:PROJECT LOCATION: Along the future extension of Poinsettia Lane from its existing terminus at Cassia Road east to Skimmer Court. PROJECT DESCRIPTION: Partial funding for construction of Reach "E" of Poinsettia Lane including full width grading to major arterial standards, adequate drainage improvements necessary to protect the roadbed, and two 18-foot paved traffic lanes separated by a raised unimproved median. Also included within the project are all land acquisition and environmental mitigation costs. The project is part of the improvements funded by Bridge and Thoroughfare District No. 2 (B&TD#2). PROJECT NEED: Required pursuant to the City's Circulation Elements and Growth Management Program. FINANCING: Purpose Design/Construction Land Acquisition Total Cost = Estimated Cost $9,450,000 $9,450,000 Funding Source B&TD#2 B&TD#2E Page 222 CAPITAL PROJECT DESCRIPTION CIRCULATION SYSTEM STREET PROJECTS - BRIDGE AND THOROUGHFARE DISTRICT NO. 2 POINSETTIA LANE REACHES A. B. C. F. G & AVIARA PARKWAY REIMBURSEMENT PROJECT NAME NONE PROJECT NO. PROJECT LOCATION MAP:PROJECT LOCATION: Along Poinsettia Lane from the eastern Zone 19 boundary to El Camino Real. PROJECT DESCRIPTION: Reimbursement for construction of Reach A, B, C, F, & G of Poinsettia Lane and a portion of Aviara Parkway including full-width grading to major arterial standards, adequate drainage improvements necessary to protect the roadbed, and two 18-foot paved traffic lanes separated by a raised unimproved median. The project is part of the improvements funded by Bridge and Thoroughfare District No. 2 (B&TD#2). PROJECT NEED: Required to meet Growth Management Standards for future development within Local Facility Management Zone. FINANCING: Purpose Construction Total Cost = Estimated Cost Funding Source $1,320,729 B&TD #2 $1,320,729 AVIA ECR Page 223 CAPITAL PROJECT DESCRIPTION CIRCULATION SYSTEM STREET PROJECTS - B&TD #3 - CANNON ROAD WEST FROST AVENUE TO FARADAY AVENUE (REIMBURSEMENT) PROJECT NAME 31842 PROJECT NO. PROJECT LOCATION MAP:PROJECT LOCATION: Cannon Road from Frost Avenue to Faraday Avenue. PROJECT DESCRIPTION: Reimbursement for the construction of a 4-lane major arterial road from Frost Avenue to Faraday Avenue. Work includes full width grading, curb and gutter, base and paving, raised landscaped median, sidewalks and streetlights. NOTE: Cannon Road West was constructed entirely by the adjacent land developer. The City may reimburse the developer for eligible work in accordance with a Council approved reimbursement agreement. PROJECT NEED: Required to comply with Growth Management Standards and to complete a vital arterial roadway identified in the Circulation Element of the General Plan. FINANCING: Purpose Construction Total Cost = Estimated Cost $6,260,226 $6,260,226 Funding Source B&TD #3 CANNWEST Page 224 CAPITAL PROJECT DESCRIPTION CIRCULATION SYSTEM STREET PROJECTS - CANNON ROAD REACH 4B COLLEGE BOULEVARD TO OCEANSIDE PROJECT NAME 38141 PROJECT NO. PROJECT LOCATION MAP:PROJECT LOCATION: Along Cannon Road from future College Boulevard to the Carlsbad/Oceanside city limits. PROJECT DESCRIPTION: Preliminary design of Reach 4 of Cannon Road to full major arterial standards, including all required environmental mitigation costs. PROJECT NEED: Required pursuant to the City Circulation Element and to comply with the Growth Management Circulation Standards. Since the project passes through the existing coastal sage habitat preserve area, it is not included as a financing requirement of any of the local facilities management plans. FINANCING: Purpose Preliminary Design Total Cost = Estimated Cost $1,761,000 $1,761,000 Funding Source TransNet Hwy Cannon34 Page 225 CAPITAL PROJECT DESCRIPTION CIRCULATION SYSTEM STREET PROJECTS - CARLSBAD BOULEVARD AT BREAKWATER ROAD - LEFT TURN LANE PROJECT NAME 39471 PROJECT NO. PROJECT LOCATION MAP: PROJECT SITE PROJECT LOCATION: Northbound Carlsbad Boulevard at Breakwater Road PROJECT DESCRIPTION: Installation of left turn lane on northbound Carlsbad Boulevard including the required roadway widening, median removal, drainage structures, traffic signal modifications, and signing and striping. PROJECT NEED: Access to the South Carlsbad State Beach campground facility is restricted to southbound traffic only. Vehicles approaching on westbound Poinsettia Lane and northbound Carlsbad Boulevard must divert north on Carlsbad Boulevard. The proposed left turn lane will allow these northbound vehicles to u-turn at Breakwater Road and enter the campground from southbound Carlsbad Boulevard. FINANCING: Purpose Total Cost = Estimated Cost Funding Source $243,150 SCCRDA Uturncbad Page 226 CAPITAL PROJECT DESCRIPTION CIRCULATION SYSTEM STREET PROJECTS - CARLSBAD BOULEVARD AND STATE STREET PEDESTRIAN AND INTERSECTION ENHANCEMENT DESIGN PROJECT NAME 38541 PROJECT NO. PROJECT LOCATION MAP: PROJECT SITE HUENA VISTA LAGOON DR, PROJECT LOCATION: Carlsbad Boulevard from north city limits to State Street. PROJECT DESCRIPTION: The project involves the study and design of a pedestrian walkway on the eastern side of Carlsbad Boulevard from State Street to the northern City limits. The feasibility study will review pedestrian/bicycle/vehicle access and safety issues along Carlsbad Boulevard, identify potential safety improvements, determine the scope of the environmental and operational impacts, and develop planning level cost estimates for the various options identified in the study. The project may also include intersection modifications at Carlsbad Blvd and State Street to incorporate a traffic signal or stop control to assign right-of- way. The project will then complete design plans for the appropriate enhancements/improvements. PROJECT NEED: A pedestrian walkway is needed to provide separation between pedestrians and vehicles/bicycles traveling between Carlsbad and Oceanside along Carlsbad Boulevard. Modification of the Carlsbad Blvd/State Street intersection and installation of traffic control devices will facilitate rigiqt-of-way assignment. FINANCING: Purpose Study/Report Design Total Cost = Estimated Cost Funding Source $105,000 $100,000 $205,000 GCC Redvl Village CbacLState Page 227 CAPITAL PROJECT DESCRIPTION CIRCULATION SYSTEM STREET PROJECTS - CARLSBAD BOULEVARD AND STATE STREET INTERSECTION ENHANCEMENT DESIGN PROJECT NAME NONE PROJECT NO. PROJECT LOCATION MAP: PROJECT SITE PROJECT LOCATION: Intersection of Carlsbad Boulevard and State Street. PROJECT DESCRIPTION: Design pedestrian walkway on the eastern side of Carlsbad Boulevard from State Street to northern City limits. Project may also include intersection modification design to incorporate a traffic signal or stop control to assign right-of-way. PROJECT NEED: A pedestrian walkway is needed to provide separation between pedestrians and vehicles/bicycles. Modification of the intersection and installation of traffic control devices will facilitate right-of-way assignment. FINANCING: Purpose Design Total Cost = Estimated Cost $100,000 $100,000 Funding Source Redvl Village Chad State Page 228 CAPITAL PROJECT DESCRIPTION CIRCULATION SYSTEM STREET PROJECTS - CARLSBAD BOULEVARD ENCINAS CREEK BRIDGE REPLACEMENT PROJECT NAME 39191 PROJECT NO. PROJECT LOCATION MAP: PROJECT PROJECT LOCATION: Southbound lanes of Carlsbad Boulevard south of Palomar Airport Road and north of the South Carlsbad State Beach campgrounds. PROJECT DESCRIPTION: Complete replacement of the existing bridge structure for southbound lanes of Carlsbad Boulevard originally constructed in 1913. The budget for this project includes staff time to pursue federal grants for funding of the project. PROJECT NEED: Carlsbad Boulevard is a major north/south transportation roadway in north county. The bridge structure does not meet seismic standards and is close to exceeding its expected service life. Reinforcing steel is exposed and corroding and Caltrans has recommended that the bridge be replaced. FINANCING: Purpose Studies & Reports Construction Total Cost = Estimated Cost Funding Source $41,453 $1,804,000 $1,845,453 SCCRDA Federal Grant ECbridge Page 229 CAPITAL PROJECT DESCRIPTION CIRCULATION SYSTEM STREET PROJECTS - CARLSBAD BOULEVARD MEDIAN TAMARACK AVENUE TO PINE AVENUE PROJECT NAME 34441 PROJECT NO. PROJECT LOCATION MAP:PROJECT LOCATION: Carlsbad Boulevard from Tamarack Avenue to Pine Avenue. PROJECT DESCRIPTION: Construct raised, landscaped median. Work includes concrete curb, landscaping, irrigation and colored, stamped concrete. PROJECT NEED: The median is needed to bring this section of Carlsbad Boulevard up to City Standards for a major arterial. FINANCING: Purpose Estimated Cost Funding Source Design/Construction $1,398,000 PFF Total Cost = $1,398,000 CBMEDIAN Page 230 CAPITAL PROJECT DESCRIPTION 35571 CIRCULATION SYSTEM STREET PROJECTS - CARLSBAD BOULEVARD BRIDGE RETROFIT OVER SAN DIEGO NORTHERN RAILROAD PROJECT NAME PROJECT NO. PROJECT LOCATION MAP:PROJECT LOCATION: On Carlsbad Boulevard 500' southerly of its intersection with State Street. PROJECT DESCRIPTION: The project consists of removing the existing 72 year old two-lane bridge and constructing a new four-lane bridge with bicycle lanes and sidewalks over the San Diego Northern Railroad. PROJECT NEED: Caltrans has determined that the bridge over the railroad is vulnerable to severe damage during the design earthquake. Caltrans and the Federal Highways Administration will fund a seismic retrofit of the bridge. Given the age and conditions of the bridge, Caltrans has agreed to apply the retrofit funds towards the construction of a replacement bridge. Widening of the bridge is necessary to bring this section of Carlsbad Boulevard into conformance with City Standards and to assure compliance with Growth Management Standards at buildout. FINANCING: Purpose Design Construction Estimated Cost Funding Source $500,000 $600,000 TransNet/Local* TransNet/Local* Total Cost = $1,100,000 * Funds totaling approximately $800,000 to be reimbursed from State Grant. RRbridge Page 231 CAPITAL PROJECT DESCRIPTION CIRCULATION SYSTEM STREET PROJECTS - CARLSBAD BOULEVARD WIDENING CANNON ROAD TO MANZANO DRIVE PROJECT NAME NONE PROJECT NO. PROJECT LOCATION MAP:PROJECT LOCATION: Carlsbad Boulevard from Manzano Drive to Cannon Road. PROJECT DESCRIPTION: Widen Carlsbad Boulevard from two lanes to four lanes with a center raised median (major arterial). Construct pavement, curb and gutter, stamped concrete and landscaping. A planning study was initiated in 1992 to determine alignment alternatives and investigate property access problems. PROJECT NEED: Required to meet Growth Management Standards and the Circulation Element of the General Plan. FINANCING: Purpose Estimated Cost Funding Source Design/Construction $2,260,000 TIP Total Cost = $2,260,000 CBADWIDE Page 232 CAPITAL PROJECT DESCRIPTION NONE CIRCULATION SYSTEM STREET PROJECTS - CARLSBAD VILLAGE DRIVE WIDENING PROJECT NO PROJECT NAME PROJECT LOCATION MAP:PROJECT LOCATION: On Carlsbad Village Drive from 200 feet east of Pontiac Drive to 200 feet east of Victoria Street. PROJECT DESCRIPTION: Widen Carlsbad Village Drive to secondary arterial standards; street is currently only half-width. Construct curb & gutter, sidewalk, streetlights, median curb, base and asphalt pavement. The project design may include standard modifications consistent with local environmental and topographical constraints of the project site. PROJECT NEED: Required to meet Growth Management Standards and the Circulation Element of the General Plan. FINANCING: Purpose Estimated Cost Funding Source Design/Construction $1,423,000 TIP Total Cost = $1,423,000 CVDWIDEN Page 233 CAPITAL PROJECT DESCRIPTION CIRCULATION SYSTEM STREET PROJECTS - COLLEGE BOULEVARD REACH A AND CANNON ROAD REACH 4A PROJECT NAME 36362 PROJECT NO. PROJECT LOCATION MAP: PROJECT PROJECT LOCATION: College Boulevard east of ECR from the existing College Boulevard terminus at Badger Lane to Cannon Road and Cannon Road from College Boulevard to approximately 1,200 foot east. PROJECT DESCRIPTION: Construction of the core improvements to College Boulevard from Badger Lane to Cannon Road and Cannon Road from College Boulevard to approximately 1,200 feet east of the College/Cannon intersection. The core improvements include full-width grading, two 18-foot paved travel lanes (one on each side of a raised unimproved median), median curbs, transition to full improvements at the intersection of College Boulevard and Cannon Road, drainage improvements to protect the road fill, a bridge structure across Sunny Creek, erosion control, environmental mitigation and Master Drainage Plan flood retention Basin BJ. The Basin BJ improvements include relocation of the existing private RV storage, maintenance facilities and community garden owned by the Rancho Carlsbad Mobile Home Park residents which currently occupy the proposed basin site. PROJECT NEED: The project is needed to comply with the City's Growth Management Plan and to complete the Circulation Element. FINANCING: Purpose Environmental Construction Total Cost = Estimated Cost $220,000 $1,493,000 $1,713,000 Funding Source Other (Developer) Other (Developer) CollegeA Page 234 CAPITAL PROJECT DESCRIPTION 38791 CIRCULATION SYSTEM STREET PROJECTS - COLLEGE BOULEVARD/CANNON ROAD REACH 3 PROJECT NO. ASSESSMENT DISTRICT PROJECT NAME PROJECT LOCATION MAP: LAKE CALAVERA PROJECT LOCATION: Along the extension of College Boulevard from Cannon Road to Carlsbad Village Drive and along the extension of Cannon Road from El Camino Real to College Boulevard. PROJECT DESCRIPTION: Formation of a financing district for the purpose of financing the construction of the above described sections of College Boulevard and Cannon Road. The improvements within the project include full width grading of the College and Cannon roadways to major arterial standards, construction of the center two lanes separated by a raised unimproved median, installation of needed drainage improvements to protect the roadbed, and full width improvements of the arterial intersections with El Camino Real. The outside traffic lanes, fronting improvements and median landscaping/hardscaping will be the obligation of adjacent developing property owners. PROJECT NEED: The project is required to complete the Circulation Element of the General Plan and to comply with the Growth Management Standard for circulation facilities. Financing for the project is required prior to any further development within Zones 7 and 14. Construction of the project may occur in phases consistent with the requirements of the various individual zone plans. FINANCING: Purpose Construction Total Cost = Estimated Cost $10,314,481 $10,314,481 Funding Source Assessment District B&TD_4 Page 235 CAPITAL PROJECT DESCRIPTION NONE CIRCULATION SYSTEM STREET PROJECTS - EL CAMINO REAL AND CARLSBAD VILLAGE DRIVE PROJECT NAME PROJECT NO. PROJECT LOCATION MAP: o -=c PROJECT LOCATION: At the intersection of El Camino Real and Carlsbad Village Drive. PROJECT DESCRIPTION: Construct northbound and southbound dual left-turn lanes on El Camino Real. PROJECT NEED: Required to meet Growth Management Standards. FINANCING: Purpose Estimated Cost Funding Source Construction $320,000 TIP Total Cost = $320,000 ECRCVDR Page 236 CAPITAL PROJECT DESCRIPTION CIRCULATION SYSTEM STREET PROJECTS - EL CAMINO REAL AND FARADAY AVENUE PROJECT NAME 36071 PROJECT NO. PROJECT LOCATION MAP:PROJECT LOCATION: The intersection of El Camino Real and Faraday Avenue. PROJECT DESCRIPTION: Intersection improvements which include adding three exclusive right turns (southbound, eastbound and westbound). Construct curb and gutter, asphalt pavement and sidewalk. Additional right-of-way will be required. PROJECT NEED: Required to meet Growth Management Standards. FINANCING: Purpose Admin/Inspection Design Construction Total Cost = Estimated Cost Funding Source $67,000 $33,000 $781,000 $881,000 TIP TIP TIP ECRFARAD Page 237 CAPITAL PROJECT DESCRIPTION NONE CIRCULATION SYSTEM STREET PROJECTS - EL CAMINO REAL AT AVIARA PARKWAY/ALGA ROAD PROJECT NAME PROJECT NO. PROJECT LOCATION MAP:PROJECT LOCATION: On El Camino Real at Aviara Parkway/Alga Road. PROJECT DESCRIPTION: Construction of median improvements and lane striping immediately south of Aviara Parkway/Alga Road to accommodate dual northbound to westbound turn lanes. May include modification to the existing traffic signal standards. PROJECT NEED: Required to comply with Growth Management Standards. FINANCING: Purpose Estimated Cost Funding Source Design/Construction $282,000 TIP Total Cost = $282,000 EC RAVI AR Page 238 CAPITAL PROJECT DESCRIPTION CIRCULATION SYSTEM STREET PROJECTS - EL CAMINO REAL MEDIANS PROJECT NAME 39091 & 36431 PROJECT NO. PROJECT LOCATION MAP:PROJECT LOCATION: At various locations along El Camino Real between the north and south City boundaries. PROJECT DESCRIPTION: Construct raised, landscaped medians at various places where no developer will be obligated to do so as a condition of a private development. Work includes median curb, stamped concrete paving, irrigation and landscaping. NOTE: Project funds may be used to reimburse developer for construction of median improvements in excess of those improvements required of the development. Currently, $100,000 is budgeted to reimburse the Evans Point developer for median improvements constructed adjacent to the Rancho Carlsbad Mobile Home Park. PROJECT NEED: Raised landscaped medians are required on prime arterials for vehicular safety and to meet City standards. FINANCING: Purpose Construction Total Cost = Estimated Cost Funding Source $1,960,000 PFF $1,960,000 ECRMDIAN Page 239 CAPITAL PROJECT DESCRIPTION CIRCULATION SYSTEM STREET PROJECTS - EL CAMINO REAL WIDENING LA COSTA AVENUE TO ARENAL ROAD PROJECT NAME NONE PROJECT NO. PROJECT LOCATION MAP: LAGOON PROJECT LOCATION: On the west side of El Camino Real from La Costa Avenue to Arenal Road. PROJECT DESCRIPTION: Add the southbound lane for a length of approximately 3,400 feet to widen the street to full prime arterial standards. Construct curb & gutter, sidewalk, base, and asphalt pavement and streetlights. PROJECT NEED: Required to comply with Growth Management Standards. FINANCING: Purpose Estimated Cost Funding Source Design/Construction $508,000 TIP Total Cost = $508,000 ECRLACOS Page 240 CAPITAL PROJECT DESCRIPTION CIRCULATION SYSTEM STREET PROJECTS - EL CAMINO REAL WIDENING LISA STREET TO CRESTVIEW DRIVE PROJECT NAME NONE PROJECT NO. PROJECT LOCATION MAP: PROJECTSITE PROJECT LOCATION: West side of El Camino Real from south of Lisa Street to Crestview Drive. PROJECT DESCRIPTION: Widening approximately 1,200 linear feet of roadway including construction of curb, gutter, sidewalks, pavement, median, and roadway rehabilitation on El Camino Real. PROJECT NEED: El Camino Real is identified in the SANDAG Congestion Management Plan (CMP) as a failing road. Adjacent property is fully developed. Widening this section of roadway will contribute to the City's CMP deficiency plan as mandated by the State. FINANCING: Purpose Design & Environmental Right-of-Way Construction Total Cost = Estimated Cost $82,000 $250,000 $627,000 $959,000 Funding Source *TransNet Local *TransNet Local *TransNet Local *Funding source may change if adjacent property develops or assessment districts are formed. ECR Lisa Page 241 CAPITAL PROJECT DESCRIPTION CIRCULATION SYSTEM STREET PROJECTS - EL CAMINO REAL WIDENING - NORTH OF COUGAR DRIVE PROJECT NAME 39201 PROJECT NO. PROJECT LOCATION MAP: PROJECT SITE PROJECT LOCATION: East side of El Camino Real north of Cougar Drive. PROJECT DESCRIPTION: Widening approximately 250 linear feet of roadway including construction of curb, gutter, sidewalks, pavement, median, and roadway rehabilitation on El Camino Real. PROJECT NEED: El Camino Real is identified in the SANDAG Congestion Management Plan (CMP) as a failing road. Adjacent property is fully developed. Widening this section of roadway will contribute to the City's CMP deficiency plan as mandated by the State. FINANCING: Purpose Design & Environmental Right-of-Way Construction Total Cost = Estimated Cost $30,000 $60,000 $403,000 $493,000 Funding Source TransNet Local TransNet Local *TransNet Local 'Funding source may change if adjacent property develops or assessment districts are formed. Elcamino Page 242 CAPITAL PROJECT DESCRIPTION CIRCULATION SYSTEM STREET PROJECTS - EL CAMINO REAL WIDENING TAMARACK AVENUE TO CHESTNUT AVENUE PROJECT NAME 39571 & 39291 PROJECT NO. PROJECT LOCATION MAP: PROJECT PROJECT LOCATION: Along El Camino Real from Tamarack Avenue to Chestnut Avenue. PROJECT DESCRIPTION: Add the outside lane to widen street to full prime arterial standards. Widen west side approximately 1,200 feet in length and east side approximately 600 feet in length. Construct curb & gutter, sidewalk, base, and asphalt pavement and streetlights. PROJECT NEED: To complete widening to prime arterial standards where no developers are likely to develop and to improve the road capacity. FINANCING: Purpose Estimated Cost Funding Source Design/Construction $1,904,823 TIP Total Cost = $1,904,823 ECRWIDE2 Page 243 CAPITAL PROJECT DESCRIPTION 36222 CIRCULATION SYSTEM STREET PROJECTS - FARADAY AVENUE/MELROSE DRIVE EXTENSIONS PROJECT NO PROJECT NAME PROJECT LOCATION MAP: OCEANSIDE PROJECT PROJECT LOCATION: Along the extension of Melrose Drive from Palomar Airport Road to the Carlsbad/Vista city limit and along the extension of Faraday Avenue from Orion Way to Melrose Drive in Vista. PROJECT DESCRIPTION: Construction of two lanes of Faraday Avenue approximately 1.3 miles from its current terminus at Orion Way easterly to Melrose Drive in the City of Vista and the construction of four lanes of Melrose Drive approximately 0.3 miles from Palomar Airport Road to its current terminus at the Carlsbad/Vista city boundary. The project would include the reconstruction of a portion of existing Melrose Drive in the City of Vista and the construction of a bridge over the Agua Hedionda Creek along Faraday Avenue. PROJECT NEED: The project is required to complete the Circulation Element of the General Plan and to comply with the Growth Management Standard. The project will divert significant amounts of traffic from existing Palomar Airport Road by providing a second east/west arterial linkage from Melrose Drive to Interstate 5 through the core of the Carlsbad and Vista industrial centers. FINANCING: Purpose Estimated Cost Funding Source Preliminary Design Design/Construction Design Design Total Cost***= $1,021,826 $3,000,000 $97,210 ++ $110,200 ++ $3,207,410 Other (Developer) Other Water Connection Sewer Replacement ++ Project Nos. 36224, 36225 +++Excludes construction costs by developer FAR MELR Page 244 CAPITAL PROJECT DESCRIPTION 35931 CIRCULATION SYSTEM STREET PROJECTS - FARADAY AVENUE MITIGATION - SOUTH OF CANNON ROAD PROJECT NAME PROJECT NO. PROJECT LOCATION MAP:PROJECT LOCATION: North side of Faraday Avenue, east of Cannon Road. PROJECT DESCRIPTION: Monitoring and maintenance of a coastal sage scrub mitigation site. PROJECT NEED: Required by Resource Agency permits to construct Faraday Avenue. FINANCING: Purpose Estimated Cost Funding Source Mitigation Maintenance $5,500,000* CFD#1 Total Cost = $5,500,000* * Construction of Faraday Avenue was completed in 2003. A balance of $63,661 remains to cover costs associated with maintenance of environmental mitigation requirements. FARADAY Page 245 CAPITAL PROJECT DESCRIPTION CIRCULATION SYSTEM FREEWAY INTERCHANGE PROJECTS - INTERSTATE 5 AND LA COSTA AVENUE AUXILIARY LANES PROJECT NAME PROJECT NO. PROJECT LOCATION MAP:PROJECT LOCATION: At the intersection of Interstate 5 and La Costa Avenue. PROJECT DESCRIPTION: The addition of auxiliary traffic lanes on Interstate 5 to be installed at the future direction of Caltrans. PROJECT NEED: Required to meet Growth Management Standards. FINANCING: Purpose Estimated Cost Funding Source Design/Construction $2,000,000 CFD #1 Total Cost = $2,000,000 l-5LACOS.doc Page 246 CAPITAL PROJECT DESCRIPTION NONE CIRCULATION SYSTEM STREET PROJECTS - MELROSE DRIVE AND ALGA ROAD PROJECT NO. PROJECT NAME PROJECT LOCATION MAP: CE:c^ i i ioo ALGA ROAD PROJECT LOCATION: At the intersection of Melrose Drive and Alga Road. PROJECT DESCRIPTION: Construct dual left-turn lanes on all approaches to the intersections- northbound, southbound, eastbound and westbound. PROJECT NEED: Required to meet Growth Management Standards. FINANCING: Purpose Estimated Cost Funding Source Design/Construction $542,000 TIP Total Cost = $542,000 MELROALG Page 247 CAPITAL PROJECT DESCRIPTION NONE CIRCULATION SYSTEM STREET PROJECTS - PALOMAR AIRPORT ROAD AND COLLEGE BOULEVARD PROJECT NO. PROJECT NAME PROJECT LOCATION MAP: •tJ PROJECT LOCATION: At the intersection of the Palomar Airport Road and College Boulevard. PROJECT DESCRIPTION: Construct dual left-turn lane on College Boulevard southbound to eastbound. Project work includes reconstruction of median improvements, striping and signal modifications. Additional right-of-way will be required. PROJECT NEED: Required to meet Growth Management Standards. FINANCING: Estimated Cost Funding Source $160,000 TIP $160,000 Purpose Design/Construction Total Cost = PARCOLLE Page 248 CAPITAL PROJECT DESCRIPTION CIRCULATION SYSTEM STREET PROJECTS - PALOMAR AIRPORT ROAD WIDENING AT PASEO DEL NORTE PROJECT NAME 38111 PROJECT NO. PROJECT LOCATION MAP: PROJECTSITE P4.CIFK OCEAN PALOMAR AIRPORT RD. PROJECT LOCATION: On the north side of Palomar Airport Road at the intersection with Paseo Del Norte. PROJECT DESCRIPTION: Widen the easterly approach of Palomar Airport Road (PAR) at the intersection of Paseo Del Norte (PDN) to accommodate an additional through lane. The added lane would be designed to align with the existing "right-turn only" lane onto northbound Interstate 5. The existing westbound to northbound right-turn lane from PAR to PDN would be relocated slightly north of its current location to eliminate the partial offset with the existing "right-turn only' lane on the west side of the intersection. PROJECT NEED: Required to meet the Growth Management Circulation Standard. The current intersection is operating at an unacceptable level of service due to a backup of traffic attempting to go northbound along Interstate 5. This project will allow for smoother transition of the westbound to northbound traffic into the two right-turn lanes to northbound I-5 from traffic proceeding westbound along PAR through the PDN intersection. FINANCING: Purpose Admin/Inspection Construction Total Cost = Estimated Cost $55,000 $480,000 $525,000 Funding Source TIP TIP Par_pdn Page 249 CAPITAL PROJECT DESCRIPTION CIRCULATION SYSTEM STREET PROJECTS - PARK DRIVE. MARINA DRIVE TO COVE DRIVE PROJECT NAME NONE PROJECT NO. PROJECT LOCATION MAP: SITE PROJECT LOCATION: Westerly side of Park Drive between Marina Drive and Cove Drive. PROJECT DESCRIPTION: Reconstruct the westerly curb, gutter, and sidewalk along Park Drive between marina Drive and Cove Drive. PROJECT NEED: The project will improve the condition of this segment of roadway so it is consistent with the goal of providing a safe and efficient transportation system. FINANCING: Purpose Design Construction Admin/Inspection Total Cost = Estimated Cost Funding Source $25,000 $110,627 $10,000 $145,627 IRF IRF IRF Park_dr Page 250 CAPITAL PROJECT DESCRIPTION CIRCULATION SYSTEM STREET PROJECTS - PAVEMENT MANAGEMENT PROGRAM PROJECT NAME 36671, 36791 & 38681 PROJECT NO. PROJECT LOCATION MAP: THROUGHOUT THE CITY PROJECT LOCATION: Throughout the City. PROJECT DESCRIPTION: The Pavement Management Program is an ongoing annual program designed to extend the service life of city streets and to maintain a smooth and safe driving surface for vehicles. The City utilizes a pavement management database program to determine pavement management needs for the purpose of establishing which streets are to be oil sealed, chipped sealed, overlaid or reconstructed. On a periodic basis the condition of the roads are field surveyed and the pavement management database is updated to reflect current conditions. Each year, specific pavement management projects are defined and funding is transferred into a pavement management project account. PROJECT NEED: City streets require annual maintenance to maintain a safe and smooth driving surface and to extend the useful service life of the streets. FINANCING: Purpose Pavement Management Pavement Management Pavement Management Estimated Cost Funding Source $56,210,348 $4,701,088 $11,809,000 TransNet/Local* Gas Tax Other Total Cost = $72,720,436 * Includes $49,993 balance forward from Project No. 38551. PVMTMGMT Page 251 CAPITAL PROJECT DESCRIPTION CIRCULATION SYSTEM STREET PROJECTS - POINSETTIA LANE EAST OF EL CAMINO REAL FINANCING PROGRAM PROJECT NAME 36892 PROJECT NO. PROJECT LOCATION MAP:PROJECT LOCATION: Along the future alignment of Poinsettia Lane from El Camino Real east to El Fuerte Street. PROJECT DESCRIPTION: Formation of a financing district/program to guarantee the construction of Poinsettia Lane to full major arterial standards west of El Camino Real. The project, in conjunction with the Poinsettia Lane improvements proposed west of El Camino Real, will complete another east/west arterial linkage from Melrose Drive to Interstate 5. PROJECT NEED: Required pursuant to the City Circulation Element and Growth Management Program. FINANCING: Purpose Construction Total Cost = Estimated Cost $28,932,793 $28,932,793 Funding Source Other POINEAST Page 252 CAPITAL PROJECT DESCRIPTION CIRCULATION SYSTEM STREET PROJECTS - POINSETTIA LANE WIDENING (PASEO DEL NORTE TO BATIQUITOS LANE) PROJECT NAME NONE PROJECT NO. PROJECT LOCATION MAP:PROJECT LOCATION: From Paseo De! Node to Batiquitos Lane. PROJECT DESCRIPTION: Widen Poinsettia Lane from Paseo Del Norte to Batiquitos Lane to six lanes by adding one lane in each direction. Construct curb and gutter, base, asphalt pavement and sidewalk. Right-of-way is required. PROJECT NEED: Required to meet Growth Management Standards. FINANCING: Purpose Estimated Cost Funding Source Design/Construction $2,113,000 TIF Total Cost = $2,113,000 POINWIDE Page 253 CAPITAL PROJECT DESCRIPTION CIRCULATION SYSTEM STREETS PROJECTS - RANCHO SANTA FE ROAD AND OLIVENHAIN ROAD IMPROVEMENTS PROJECT NAME 38601 PROJECT NO. PROJECT LOCATION MAP:PROJECT LOCATION: Intersection of Rancho Santa Fe Road and Olivenhain Road. PROJECT DESCRIPTION: Complete full intersection improvements to the Rancho Santa Fe Road and Olivenhain Road intersection to General Plan standards. Extend street improvements on Rancho Santa Fe Road between the Olivenhain Municipal Water District access to a distance approximately 200 feet east of the intersection with Olivenhain Road. Extend street improvements on Olivenhain Road from the intersection with Olivenhain Road west to meet existing full-width improvements within the City of Encinitas. The project would involve right-of-way acquisition, grading, storm drains, removal of existing improvements and installation of surface improvements, street lights, and coordination with agencies for utility realignment PROJECT NEED: These improvements are required in order to keep intersection capacity at or below the thresholds dictated by the Growth Management Standards and per the General Plan for build-out. Full intersection improvements will improve vehicular circulation and increase safety to serve the public and nearby developments to the south that will impact the intersection once full occupancy is reached. The City of Encinitas and Olivenhain Municipal Water District are in support of the project and will reimburse the City of Carlsbad for their share of the improvements. FINANCING: Purpose Estimated Cost Funding Source Design/Construction $3,800,000 CFD #2 Total Cost = $3,800,000 Olivenrsf Page 254 CAPITAL PROJECT DESCRIPTION CIRCULATION SYSTEM STREET PROJECTS - RANCHO SANTA FE ROAD NORTH PHASE I PROJECT NAME 39231 & 31906 PROJECT NO. PROJECT LOCATION MAP: PROJECT PROJECT LOCATION: Along the future alignment of Rancho Santa Fe Road from La Costa Avenue to approximately 1,800 feet south of Questhaven Road. PROJECT DESCRIPTION: Construction of 4 lanes of Rancho Santa Fe Road to prime arterial standards including full width grading. Project involves the realignment of Rancho Santa Fe Road easterly of its present alignment to a location approximately in the area of the current truck bypass route. PROJECT NEED: Required to meet Growth Management Standards. FINANCING: Purpose Estimated Cost Design/Construction $26,406,243 Total Cost = $26,406,243 Funding Source CFD#2 RSFN PHI.doc Page 255 CAPITAL PROJECT DESCRIPTION 39231 & 39071 CIRCULATION SYSTEM STREET PROJECTS - RANCHO SANTA FE ROAD NORTH PHASE II PROJECT NO PROJECT NAME PROJECT LOCATION MAP: PROJECT PROJECT LOCATION: Along Rancho Santa Fe Road from approximately 1,800 feet south of San Elijo Road to Melrose Drive. PROJECT DESCRIPTION: Realignment and widening of Rancho Santa Fe Road and construction of new bridge structures over the San Marcos Creek. PROJECT NEED: Required to meet Growth Management Standards. FINANCING: Estimated CostPurpose Design/Environmental Bridge Pipeline Replacement Total Cost = $3,100,000 $15,319,000 $773,000 $19,192,000 Funding Source CFD#2 CFD#2 Water Replacement RSFNPHII Page 256 CAPITAL PROJECT DESCRIPTION 38801 CIRCULATION SYSTEM STREET PROJECTS - RANCHO SANTA FE ROAD SOUTH (TO ENCINITAS) PROJECT NO PROJECT NAME PROJECT LOCATION MAP: PROJECT PROJECT LOCATION: Along Rancho Santa Fe Road south from Olivenhain Road to Encinitas. PROJECT DESCRIPTION: Construction of Rancho Santa Fe Road to modified secondary arterial road standards including full width grading and necessary drainage facilities. PROJECT NEED: Required to meet Growth Management Standards for Zone 11 development. FINANCING: Purpose Estimated Cost Funding Source Design/Construction $1,350,000 CFD #2 Total Cost = $1,350,000 RSFSOUTH Page 257 CAPITAL PROJECT DESCRIPTION CIRCULATION SYSTEM STREET PROJECTS - SIDEWALK/STREET CONSTRUCTION PROGRAM PROJECT NAME 38831 & 39531 PROJECT NO. PROJECT LOCATION MAP: N/A PROJECT LOCATION: Various streets throughout the City. PROJECT DESCRIPTION: The Sidewalk/Street Construction Program is an annual program designed to complete missing links of sidewalk throughout the City. In most cases, construction of the sidewalk improvements involve construction of adjacent street improvements to bring them into conformance with City Standards. Each year, several sidewalk/street projects are selected from the City's missing sidewalk priority list for inclusion into that year's sidewalk/street construction project. PROJECT NEED: Required to meet the pedestrian circulation policies of the Circulation Element of the General Plan. FINANCING: Purpose Estimated Cost Funding Source Design/Construction $3,834,259 TIP Total Cost = $3,834,259 SWCONPGM Page 258 CAPITAL PROJECT DESCRIPTION 39281 CIRCULATION SYSTEM STREET PROJECTS - TRAFFIC MONITORING PROGRAM PROJECT NO. PROJECT NAME PROJECT LOCATION MAP: N/A PROJECT LOCATION: Citywide. PROJECT DESCRIPTION: Perform traffic vehicle counts, analyze and report annually on adequacy of circulation system and identify any intersections or links that fail to meet Growth Management Standards. PROJECT NEED: To ensure that the circulation system meets Growth Management Standards. FINANCING: Purpose Estimated Cost Funding Source Field Counts/Reports $1,210,611 TIP Total Cost = $1,210,611 Annual Expenditures are approximately $70,000. TRAFFMON Page 259 CAPITAL PROJECT DESCRIPTION CIRCULATION SYSTEM STREET PROJECTS - UNDERGROUND UTILITY NO. 17 (ROOSEVELT STREET) PROJECT NAME 38951 PROJECT NO. PROJECT LOCATION MAP:PROJECT LOCATION: Roosevelt Street from Carlsbad Village Drive to Magnolia Avenue. PROJECT DESCRIPTION: Place all overhead utilities underground, including electric, telephone, and cable television lines. Work includes trenching, placing conduit and cable, restoring surface, and removal of existing poles and all overhead lines. PROJECT NEED: This project is identified on the City Council's adopted Underground Priority List. FINANCING: Purpose Design/Construction Street Lights Total Cost = Estimated Cost Funding Source $850,000 $509,800 $1,359,800 20A Funds (SDG&E) GCC UUD17 Page 260