2006-2007 CAPITAL IMPROVEMENT PROGRAM
OVERVIEW
The City of Carlsbad Capital Improvement Program (CIP) is a planning document that outlines the
expenditure plan for future capital projects and the corresponding revenues to pay for those
expenditures. The CIP is a financial planning document, not a commitment for spending. All
construction costs are estimates and are reviewed and further refined each year. Spending
authorization is given only at the time the City Council formally adopts the annual budget, and, at
that time, funds are only appropriated for the following fiscal year. The information shown in
subsequent years is to provide the most comprehensive snapshot of all the known future facilities
the City of Carlsbad plans to construct.
The 2006-2007 Capital Improvement Program outlines approximately
$48.8 million in new appropriations to provide additional funding for the
continuation of existing projects as well as funding for new projects.
Projected revenues during the fiscal year are estimated at $70.8 million.
Revenues are collected as building permits are issued, and as the need
for facilities arises, the money is used to fund the new facilities. As the
City continues to grow and develop, there is a corresponding increase in
the demand for development-related services and new facilities. To
ensure that the necessary infrastructure and facilities are built on a
schedule that meets or exceeds this demand, the citizens of Carlsbad
adopted a Growth Management Plan in 1986. The Growth Management Plan states that unless a
standard level of facilities is available to meet new demands resulting from the City's growth,
development cannot proceed. This Plan is the foundation for making decisions about the timing
and prioritization of the capital projects under consideration. A discussion of the City's Growth
Management Plan is located at the end of this report.
The remainder of the report explains the process and the results of the City's plans for its capital
facilities. With the exception of one funding source, there are sufficient revenues projected to
build the projects listed in the CIP. A large increase in the cost of construction materials has
occurred over the past 3 years pushing up the cost of all of the City's projects. This cost
escalation has raised the projected shortfall in the Public Facilities Fees (PFF) Fund at build out of
the City from the $4.8 million projected last year to approximately $17 million this year. It is also
important to note that as the City approaches build out there are fewer available units that can be
charged PFF. While this is not an immediate problem, it is an indication that the City may not
have the money to build all of the projects listed under the PFF program or will need to pursue
other funding options.
Several adjustments are in this year's CIP to postpone the deficit in PFF Fund to sometime after
2011. The adjustments, as reflected in the accompanying documents, include:
• Loaning the PFF Fund $4.9 million from the Gas Tax Fund. There is approximately $4.9
million of traffic signals and medians currently in the PFF Fund that are eligible to be
funded by Gas Tax revenue.
• Loaning the PFF Fund $3.6 million from the General Capital Construction Fund (GCC).
There is approximately $3.6 million currently in PFF Fund for the Tennis Courts at
Poinsettia Park that could be funded by the GCC. The tennis courts were approved by a
vote of the people in 1989.
• Loaning the PFF Fund $2.5 million from the GCC. The pool at Alga Norte Park was
approved by a vote of the people through Prop. C in 2002.
• Loaning the PFF Fund $1.0 million from the GCC. There is approximately $1.0 million
currently in PFF Fund for land acquisition for Fire Station #3 that could be funded by the
GCC.
C-1
2006-2007 CAPITAL IMPROVEMENT PROGRAM
These adjustments allow the PFF Fund to remain balanced until sometime after 2011. It is
important to remember that the projections attempt to estimate revenues for over 15 years into the
future. The actual revenues may be more or less depending on many factors including the rate of
development, building valuations, interest rates and construction costs. If the projections are
accurate, it means that the City may have to either cut back on the proposed projects or find
alternative funding sources for the projects.
It is still anticipated that the City will meet all of its growth management standards. This reflects
the Council's continued commitment to construct the facilities as needed to serve the current and
anticipated development occurring throughout the City.
PROJECT EVALUATION
What is the definition of a CIP project? Projects that are shown in the CIP are generally defined
as any construction (or reconstruction/replacement) of major infrastructure such as streets,
libraries, parks, fire stations and administrative facilities, water, sewer and drainage facilities, and
other facilities that are located on or in the ground. In most cases, the total construction cost of
each of these assets is recorded and tracked as part of the City's inventory of capital
infrastructure assets and other City-owned property.
The CIP and the Operating Budget are integral parts of the total City financing plan. This year the
CIP review process was analyzed and process improvements were implemented. Staff began by
evaluating the construction schedules for City facilities in conjunction with the workload of the staff
needed to complete the projects. Whenever reasonable, projects were pushed out into the
appropriate year or eliminated if no longer needed. In the 2006-07 CIP there are approximately
123 planned projects. All projects were analyzed using the criteria shown in the table. An
evaluation of the availability of capital construction funds as well as operating funds was then
factored into the evaluation process. Finally, this
year additional work was done in analyzing some
of the larger projects. These projects were
reviewed in detail and compared to similar
projects in the public sector to determine the most
accurate cost estimates. In several cases costs
were increased to reflect comparable actual cost
results of similar facilities as well as the higher
construction costs.
4.Does the project complete or provide part of
the basic infrastructure (example: a linking
road segment)?
5.
Due to the recent volatility in construction costs,
capital projects costs were updated to reflect the
latest increases in materials costs. This was done
through either a detailed review of the cost
components, or, in cases where the project is
only in its conceptual stages, by increasing the
total cost by the Engineering News Record (ENR)
index. As seen in the next chart, building cost increases have risen over the past several years
with a 3.2% increase in 2003, a 9.7% increase in 2004 and a 4.6% increase in 2005. The ENR is
forecasting that annual inflation for building costs could dip back to the 3%-4% range in 2006.
Project Ranking Criteria
1.Is the project required to ensure the health
and safety of the citizens, as the result of a
legal mandate, or to maintain compliance with
the City's Growth Management Plan? Are
operating funds available to operate the
facility?
2.Is the project needed soon for growth
management compliance?
3. Is the project needed now for other City
standards (example: ball field standards)?
Are there other reasons to construct the
project (example: timing or funding
opportunity, public demand)?
C-2
2006-2007 CAPITAL IMPROVEMENT PROGRAM
Building Cost Index
1998 1999 2000 2001 2002 2003 2004 2005
CAPITAL PROJECTS
The following two sections provide
information about the major capital
projects. The first section focuses on
projects planned in the next five
years, and the second section
contains an overview of the entire
expenditure plan through the buildout
of the City. All construction costs are
estimates and only 2006-07 is
appropriated. The information
shown in the future years reflects the
most comprehensive snapshot of the
known future facilities and their
associated cost at this point in time.
THE NEXT FIVE YEARS...
PARK PROJECTS
The City has planned a number of park projects over the next 5 years which will enhance the
recreational opportunities for Carlsbad's residents and allow the City to meet the standards for
park acreage as set forth in the growth management plan. Some of the more significant projects
are listed below.
• Alga Norte Park and Aquatic Center - This park site consists of 30 acres in the Southeast
Quadrant with planned amenities that include ball fields, soccer fields,
picnic areas, tot lots, a skate park, a dog park, restrooms, parking
facilities, and an aquatic center. The aquatic center will include a 50-
meter competition pool, a 12-lane instructional pool and a therapy pool
as well as a water play area with slides. A swimming pool complex
was one of the projects approved by the voters through Proposition C
in 2002. Construction is scheduled to begin in Fiscal Year 07-08. The
park is expected to cost approximately $15.9 million and the aquatic
center is estimated at $23.3 million.
• Senior Center Expansion - The 1st floor area of the existing Senior Center will be remodeled
to include additional amenities for the senior community. These may include items such as an
exercise room, art room, TV room, multi-purpose room, game room, health screening room and a
computer room. The 2nd floor will be remodeled to house City offices.
• Pine Park Community Center - The plan is to construct a 20,000 square foot community
facility and gymnasium. The facility will include basketball, volleyball, gymnastics, multi-purpose
rooms, meeting rooms, a teen center and office space. Design of this $9.0 million facility is
expected to begin in the 2009-10 fiscal year.
• Poinsettia Tennis Courts - Plans are currently underway to
build seven tennis courts with lighting at the Poinsettia Park.
• Poinsettia Park Community Center - Phase II of this 42-acre
park includes amenities such as a community facility, gymnasium,
enclosed soccer field, tot lot, picnic areas, tennis complex,
clubhouse, stadium court and additional parking. The design will
begin in Fiscal Year 2010-11.
C-3
2006-2007 CAPITAL IMPROVEMENT PROGRAM
CIVIC FACILITIES
Civic facilities include a variety of facilities from which the City can offer its services to the public.
Many of these are still in the preliminary design stage and will be further defined over the next
several years.
" Civic Center - The Civic Center will consolidate City administrative operations and facilities
into a more centralized location. It also may include a variety of other services and recreational
opportunities for citizens and visitors. Council, citizens and members of the business community
have been participating in a visioning process to determine the anticipated needs for the citizens
and for the City. Once the process is complete, a site will be chosen and design and construction
can begin.
• Public Works Center - The project is for the construction of the Public Works Center and
associated improvements. It includes offices, shops, a yard, warehouse and parking to
accommodate the Public Works department. Initial estimates put the cost at approximately $26.4
million without any land acquisition costs.
• Safety Training Center ~ It is necessary to relocate the Police Department's shooting range
which was located on the new golf course property. In addition, there is a need for specialized
training facilities for other public safety purposes. This project was authorized under Proposition
C, which was approved in 2002. Preliminary design work is currently underway. In addition to a
shooting range, the facility may include a fire training tower, residential training prop, outdoor
seating pavilion, fire administration building with classroom and storage facilities.
• Library Learning Center - This project is to provide a permanent location for the Adult
Learning and the Centre de Informacion programs. The existing building adjacent to Holiday Park
will be remodeled and a second story will be added. The current cost estimates are $6.1 million.
• Fire Station No. 6 Relocation - Fire Station No. 6 is currently
located in a temporary facility in the southeast quadrant of
Carlsbad. Relocation of this station to a 6,200 square foot
permanent facility along the east side of Rancho Santa Fe Road
is scheduled to occur concurrent with the road alignment
project. Total cost is projected at $5.4 million. This fire station is
required to help ensure a five-minute response time within the
southeast part of the City as development in that area occurs.
• Fire Station No. 3 - Fire Station No. 3 is currently located at the corner of Chestnut and
Catalina. As the City grows eastward, relocation of this station is needed to help ensure the five-
minute response time. The new station is budgeted as a 6,200 square foot facility and the current
proposed site is next to Calavera Hills Community Park. The suitability of this location is currently
under review. Total cost is projected at $6.6 million and includes $1 million for land acquisition.
STREET PROJECTS
Traffic congestion continues to be one of the top concerns among citizens. To help improve the
flow of traffic throughout Carlsbad and to keep the City's streets in top condition, there are a
number of street projects expected to be completed in the next five years. Some of the larger
streets include:
• Faraday Avenue and Melrose Drive Extensions east of El Camino Real - This project
encompasses the extension of Melrose Drive from Palomar Airport Road to the Carlsbad/Vista
city limits and the extension of Faraday Avenue from Orion Way to Melrose Drive in Vista. The
project would include the reconstruction of a portion of existing Melrose Drive in the City of Vista
and the construction of a bridge over the Agua Hedionda Creek along Faraday Avenue. This
project is being built by the developers in the area and reimbursed from the proceeds of a bond
C-4
2006-2007 CAPITAL IMPROVEMENT PROGRAM
issue. The formation of a Community Facilities District has been completed and will be the
mechanism for the issuance and repayment of the debt. At the request of the community,
Carlsbad's City Council elected to open Melrose Drive temporarily in the Summer of 2006.
Melrose Drive will be closed, work completed and reopened in 2007-2008.
• Pavement Management - A street can last a lifetime if it is properly maintained. Applying seals
and overlays when roadways are beginning to show signs of distress can minimize the more
expensive repair/reactive maintenance activities. The proactive approach consists of the
scheduled application of a seal or overlay once every seven years. By using the proactive
approach the City can efficiently maintain over 330 miles of public roadways at an annual cost of
approximately $3.3 million.
• Concrete Repair - This is a new companion program to the pavement management program.
It will insure that curbs, gutters and sidewalks are also properly maintained. By allocating the
funding both pavement and concrete replacements can be accomplished at the same time. This
will help maximize efficiencies and reduce inconvenience to the citizens. The approximate annual
cost of this new concrete repair program is $250,000.
WATER/ SEWER PROJECTS
The City'5 water and sewer projects are a vital component to the continued health and welfare of
it's citizens. Most new lines are built and paid for by developers. As the City n
ages, the number of these projects will grow as it becomes necessary to .1
repair and replace the lines that are being built today.
• Vista/Carlsbad Interceptor - Reaches 3, 11, 13 to 15, and the Agua
Hedionda lift station are scheduled in the next five years. This project is
required to handle buildout flows and replace deteriorated pipeline. It is
partially funded by the City of Vista and the total estimated costs are
currently $28.9 million.
• Water Lines - Several major water lines are scheduled for construction within the next five
years:
Cannon Road east of El Camino Real
Carlsbad Boulevard - south of Avenida Encinas
- College Boulevard - various sections
Faraday Avenue extension
Melrose Drive from Palomar Airport Road to Faraday
CAPITAL PROJECTS THROUGH BUILDOUT
The CIP for 2006-2007 to buildout outlines approximately 123 future projects at a cost of
approximately $432.3 million.
CIP Projects - All Future Projects
Type of Project
Streets/Circulation
Civic Projects
Parks
Sewer
Water
Drainage
Other (loans)
Total Future
Quantity
51
8
10
19
26
9
N/A
123
Total Cost
$102,135,754
96,451,698
75,592,259
54,287,436
36,016,971
16,153,800
51,669,952
$432,307,870
C-5
2006-2007 CAPITAL IMPROVEMENT PROGRAM
One of the largest expenditure categories is for park and recreational facility construction and
acquisition projects, which total approximately $75.6 million. Park projects planned within all
quadrants of the City are listed below in addition to the fiscal year design and/or construction is
expected to begin. More detail follows on specific projects not discussed earlier in this report.
PARK PROJECTS BY QUADRANT
Northwest Quadrant
Pine Avenue Park Community Building: 2009-10
Southwest Quadrant
Poinsettia Park Community Building: 2010-11
Aviara Community Building: 2016-21
Northeast Quadrant
Park Site Development: 2016-21
Southeast Quadrant
Alga Norte Park: 2006-07
Alga Norte Aquatic Center: 2006-07
Leo Carrilio Park Phase III: 2016-21
Citywide Park and Recreational Projects
Municipal Golf Course: 2006-07
Veteran's Memorial Park: 2011-2016
Business Park Recreational Facility: 2016-2021
• Aviara Community Facility - Located in the southwest quadrant of the city, this project includes
the construction of an 18,000 square foot community facility that would include meeting and
activity rooms, as well as park offices.
• Leo Carrilio Park Phase III - This park was once part of the original
2,538 acre working rancho, home to actor Leo Carrilio, his wife Edith, and
their daughter Antoinette. It is located in the southwest quadrant,
approximately one mile south of Palomar Airport Road, initial restoration
was completed and the park opened to the public in 2003. Future work
includes renovation of the barn into a small theatre, restoration of the
cantina, equipment shed, blacksmith shop, carriage house, and water tank.
A botanical garden, picnic areas, and trails will also be added to enhance ——-- - •- --
the visitor's experience at the ranch.
• Veterans Memorial Park - This project is located south and east of Agua Hedionda Lagoon
adjacent to the future City Golf Course. The Master Plan includes the following improvements:
community leisure needs, open space interpretive area, parking and maintenance facility. Other
suggested uses for this park include an amphitheater complex, sports complex, conference center
and numerous other active/passive recreation amenities.
Construction of Civic facilities such as libraries, administrative facilities, police and fire facilities are
currently estimated at $96.5 million of the total planned capital expenditures to buildout.
Approximately 23.7% of future expenditures are planned for street and traffic signal construction
projects. Included in this category is construction of major roadways that will add east to west and
north to south connections as well as provide additional routes to the neighboring cities of
Oceanside, Vista, and San Marcos. Sections of these roads are already under construction by
developers. Additional roadway projects include replacement of the Carlsbad Boulevard Encinas
Creek Bridge, several road-widening projects, $3.8 million for concrete repair work and over $53
million for future pavement overlay. Additional traffic signals are expected to cost approximately
$5.3 million.
Sewer and drainage projects are expected to cost over $70 million, which includes over $24
million in sewer replacement projects. Funding is also provided for the repayment of bonds for
the expansion of the Encina Wastewater Facility, and the Encina Water Pollution Control Facility
C-6
2006-2007 CAPITAL IMPROVEMENT PROGRAM
projects.
Future water projects include construction of new waterlines, both potable and recycled,
concurrent with new development. Some of the major areas in which these installations or
upgrades are planned include segments of College Boulevard and El Fuerte, and along El
Camino Real. Replacement of existing potable and recycled waterlines is also included in this
category, and additional reservoirs are planned to increase storage for ultimate demands.
Specific timing and cost estimates for all capital projects are identified in the Detail Schedule of
Capital Projects (2006-2007 to Buildout) following this narrative.
UNFUNDED PROJECTS
The City has identified the following projects, which at this time have no identifiable funding
sources. The City will investigate obtaining possible outside funding such as federal and state
grants, loans, or other financing sources.
• El Camino Real Widening from Cassia Road to Camino Vida Roble
• Palomar Airport Road Widening and Bridge Reconstruction
• Poinsettia Lane - Reach "E"
• Cannon Road - Reach 4 - College to City Limits
• Cannon Lake Park (6.7 Acres)
• Hosp Grove/Buena Vista Lagoon Improvements
FUTURE GROWTH AND DEVELOPMENT
There are a variety of revenues that are used to fund the capital
projects. In order to estimate future revenues from development,
several assumptions about the rate and type of future development
need to be made. These assumptions can change from year-to-
year and correlate with the economic climate.
Every year, City staff evaluates all existing and future private development projects and compares
this information to the buildout capacity of the City using adopted general plans. Information about
existing development activity combined with estimates of how remaining net developable land
might develop are then summarized to prepare future projections about when and where
residential and non-residential development will occur. Finance Department staff prepare cash
flow schedules using current fund balances combined with future estimated fees paid by those
developments, then compares the available funds to the expenditure plan to ensure that funding
will be sufficient for construction of the capital projects as planned in the CIP. In addition to
evaluating whether or not capital funds are sufficient, significant operating cost impacts and
availability of staff resources are also used to evaluate the timing of projects. Where funding
discrepancies occur, alternative financing methods and project timing are again evaluated and
recommendations are made to resolve the discrepancies.
Residential development is expected to taper off in the future. The number of annual building
permits issued is projected to decline compared to the previous five-year period. The
development schedules of the remaining vacant parcels is driving the timing of the future units,
rather than economic or market conditions. There is less then 5,300 units remaining before the
City is predominantly built out.
Residential development for 2006-2007 is projected at 479 units with an average about 517 units
per year over the next five years. This is compared to an average of over 1,063 units per year for
the previous five-year period. The decline is due to the dwindling supply of developable land,
rather than a lack of demand.
C-7
2006-2007 CAPITAL IMPROVEMENT PROGRAM
Residential Units Trend 2000 to 2010
Permits Issued
2000 -
1500
1000-H
500
2000 2002 2006 2008 2010
In contrast to the residential trends, the amount of non-residential development is projected to
increase over the next five years. The average annual square feet of non-residential development
for the past 5 years was about 793,000. For Fiscal Year 2006-07, the estimate is for 839,137
square feet, and the average annual development for the next 5-year period is approximately
817,000 square feet per year. Projects include several neighborhood commercial/retail
developments located in or near the areas where most of the residential development has
occurred or where new development is planned over the next several years. In the southeast
quadrant, commercial projects include retail and restaurants, a theater, a daycare center, and a
church. Sunny Creek Plaza is a planned commercial development located east of El Camino Real
at College Boulevard next to the Sunny Creek residential neighborhood, and the Bressi Ranch
area will include 130,000 square feet of commercial development. Other commercial
developments are planned at Calavera Hills and at Poinsettia Shores; at the La Costa Resort
plans include construction of 302,000 square feet of commercial living units. Industrial
development consists of various new office and industrial projects, as well as expansion of
existing projects at Kelly Corporate Center, Gemological Institute of America, and Legoland.
Development estimates provide the data and basis for estimating future fee revenues, which are
calculated by multiplying each applicable development fee by the estimated number of dwelling
units and/or square feet of construction expected during each year. The following table shows the
number of residential units and non-residential square feet of development used in calculating
estimated revenues for 2006-2007 and subsequent years to buildout.
Projected Development
Residential and Non-Residential Construction
Year
2005-2006 current
2006-2007
2007-2008
2008-2009
2009-2010
2010-2011
Years 6-10
Years 11 -buildout
Total Future
Residential
Units
676
479
909
663
397
136
1,914
785
5,283
Non-Residential
Square Feet
7,667,667
839,137
1 ,077,082
939,495
627,209
604,524
4,399,124
3,302,319
11,788,890
C-8
2006-2007 CAPITAL IMPROVEMENT PROGRAM
REVENUES
Revenues for Capital Projects from now until buildout are estimated to be approximately $541
million and are segregated into five major categories: (1) fees generated by development in
Carlsbad, (2) special district fees and taxes (Community Facilities Districts and Bridge and
Thoroughfare Benefit Districts), (3) Water and Sewer replacement reserves, (4) Infrastructure
Replacement Funds (other than sewer and water), and (5) other sources including grants, bond
issues, and contributions from other agencies.
Funding Sources 2006-2007 to Buildout
Total Revenue = $541 million
In Millions
1751
Approximately 27% of all capital revenue is received as a result of development, and is dependent
upon assumptions made about the City's annual growth in dwelling units and commer-
cial/industrial square feet. Development revenues include Public Facilities Fees (PFF), Traffic
Impact Fees (TIP), Park-ln-Lieu Fees (PIL), Planned Local Drainage (PLD) Fees, Water
Connection Fees (MFF), and Sewer Connection charges. Revenue from special districts, such as
Community Facilities Districts (CFD) and Bridge and Thoroughfare Benefit Districts (BTD)
comprise 11 % of the total. Water and Sewer replacement revenues generated by user fees equal
approximately 22% of total revenues, and are used to pay for replacement of existing water and
sewer facilities. Infrastructure replacement revenues, equal to 18%, are transfers from the City's
General Fund which are being set aside to pay for replacement of major capital facilities other
than sewer and water facilities. The remaining 22% consists of revenues from other agencies and
include federal and state grants, the county sales tax program (TransNet), redevelopment agency
revenue, golf course funding, and contributions from cities and other agencies.
CALCULATION OF FUTURE FEES
The revenue projections of the Capital Improvement Program reflect the growth assumptions
identified in the previous section. The following information delineates how those assumptions
were applied to estimate future development revenues. The mix of multi-family and single-family
residential units is assumed to be 35% and 65% respectively and reflects the anticipated mix of
residential development for each Local Facilities Management Zone. The building permit valuation
used for computing Public Facilities Fees is $166,900 per multi-family dwelling unit, and $285,600
per single-family dwelling unit. A building permit valuation of $38 per square foot of construction
is used to calculate non-residential Public Facilities Fees.
In order to calculate estimated revenues for Traffic Impact Fees (TIF), the number of average
daily trips was computed for each type of development use. A multi-family residential dwelling unit
is assigned eight trips per day and a single-family unit is assigned ten trips per day. Each
residential trip is valued at the 2006-07 TIF of $107. The trips-per-day value for commercial and
industrial buildings are averaged at 30 trips per 1,000 square feet of development, although the
C-9
2006-2007 CAPITAL IMPROVEMENT PROGRAM
actual volume of trips generated by commercial/industrial building can vary widely depending on
the ultimate land use. The value assigned to each commercial/industrial trip is $43.
CFD No. 1 is a citywide district established to finance various civic facilities required under the
City's Growth Management Plan. CFD No. 3 was established in FY 2005-06 for improvements
within the Faraday/Melrose area.
Park-in-Lieu Fees are collected for the purchase and development of
parkland within each quadrant of the City, and the fees are based on
the acquisition cost of parkland. Projects in the CIP funded with Park-
in-Lieu Fees include future park site acquisition, development and
restoration.
There are two existing Bridge and Thoroughfare Fee Districts (BTD), which were formed by
property owners to finance specific road construction projects located within each of the district
boundaries. Poinsettia Lane - Aviara Parkway (BTD No. 2) was formed to finance the
construction of Poinsettia Lane between Aviara Parkway and El Camino Real and Aviara Parkway
between Palomar Airport Road and Poinsettia Lane. BTD No. 3 (Cannon Road West) was
formed to fund portions of Cannon Road from Interstate 5 to El Camino Real. Although
construction of this project is complete, revenues collected from future development within the
district will be used to repay an advance that provided interim funding to complete the project.
SUMMARY
The 2006-2007 to Buildout CIP is being driven by the City's commitment to ensure that facilities
are available to service the developing areas as well as the current residents. Carlsbad's
philosophy has been to build quality capital facilities, which meet, and at times exceed, Growth
Management standards. Phasing projects over a period of years to match funding availability for
construction and operations is often used to meet the needs of growth management. The 2006-
2007 to Buildout Capital Improvement Program reflects the commitment of Carlsbad's Council
and staff to continue providing its residents with a better quality of life.
C-10
2006-2007 CAPITAL IMPROVEMENT PROGRAM
GROWTH MANAGEMENT PLAN
The Growth Management Plan was developed and voted into law by the citizens of Carlsbad in
1986. The plan was established to manage development within the City by linking residential,
commercial, and industrial development directly to standards for availability of public services and
facilities.
The Growth Management Plan has established precise standards for eleven public facilities.
Standards must be met at all times as growth occurs. Facilities for which standards have been
established are as follows:
- City Administrative - Library
- Wastewater Treatment - Parks
- Circulation - Drainage
- Fire - Open Space
- Schools - Sewer Collection
- Water Distribution
The plan requires that appropriate public facilities be available, in conformance with the adopted
performance standards, as development occurs. Unless all of the eleven public facility standards
have been met, no new development can occur.
The Growth Management Plan impacts both the Operating Budget and the Capital Improvement
Program. The detailed level of planning required by Growth Management has allowed Carlsbad's
Capital Improvement Program to anticipate the funding needed for capital improvements through
buildout of the City. The timing of construction of facilities is governed by the rate of development
and the eleven performance standards. New public facilities often require additional staffing and
other resources, which affects the Operating Budget. Facilities such as community centers,
parks, and fire stations have been constructed and opened to the public under this program.
The Capital Improvement Program has been designed to specifically address areas where new or
expanded facilities will be needed to maintain compliance with the adopted performance
standards. With the adoption of the 2006-2007 CIP, compliance with the Growth Management
Plan is continued.
C-11
CITY OF CARLSBAD
CAPITAL FUNDS
PROJECTED FUND BALANCES FOR FY 2005-2006
FUND
BTD#2 - POINSETTIA LANE/AVIARA PKWY
8TD#3 - CANNON ROAD WEST
CFD#1 -CITYWIDE
GAS TAX
GENERAL CAPITAL CONST.
GOLF COURSE
GRANTS - FEDERAL
GRANTS - STATE
INFRASTRUCTURE REPLACEMENT
OTHER
PARK FEE ZONES 5,13,16
PARK-IN-LIEU NE
PARK-IN-LIEU NW
PARK-IN-LIEU SE
PARK-IN-UEU SW
PLANNED LOCAL DRAIN'G
PUBLIC FACILITIES FEE
RANCHO SANTA FE ROAD PROJECT
REDEVELOPMENT VILLAGE
REDEVELOPMENT SCCRDA
SEWER BENEFIT AREAS
SEWER CONNECTION
SEWER REPLACEMENT
TDA
TRAFFIC IMPACT FEE
TRANSNET/BIKE
TRANSNET/HIGHWAY
TRANSNET/LOCAL
TRANSNET/STP
WATER - MAJOR FACILITY
WATER - RECYCLED WATER
WATER - REPLACEMENT
TOTAL
JULY 1,2005
UNRESERVED
BALANCE
6,875,391
1 ,065.056
45,238,635
7,442,488
49,788,137
3,729,919
200,864
32,076
18,438,548
31,534,237
886,452
803,215
582,888
1,702,029
637,160
9,426,51 1
38,751,553
14,609,171
0
263,350
4,269,049
30,702,746
20,645,096
0
10,169,292
194,419
1 ,227,298
7,271,550
298,891
14,960,521
(1,488,882)
16,304,125
336,561 ,785
ESTIMATED
REVENUES
1,615,047
94,439
4,830,664
2,069.211
3,375,207
44,848,207
1,874,459
400,953
5,030,519
1,108,797
342,701
174,235
63,085
391,602
371,139
828,289
6,544,033
5,075,094
715,000
0
869,769
2,079,146
3,944,496
100,000
2,046,602
157,221
42,451
2,546,943
10,446
3,437,522
27,613,757
4,392,440
127,043,474
ESTIMATED
EXPENDITURES
116
0
59,437
3,420,456
5,423,855
42,239,391
1,767,787
31,701
1,457,343
5,879,180
0
606,751
0
0
0
1,729,637
8,352,408
8,289,628
41,810
257,206
844,931
(12,922)
2,534,863
0
1,092,602
227,747
82,882
5,285,181
0
833,933
10,941,771
3,297,142
104,684,836
ESTIMATED
DEBT SERVICE
LOANS & OTHER
0
65,480
278,621
277,698
0
166,103
0
400,738
0
746,780
0
0
0
0
0
426,305
0
7,317
0
0
0
2,508,438
350,600
0
3,405
0
4.814
35,843
228,369
0
0
0
5,500,511
JUNE 30, 2006
PROJECTED
BALANCE
8,490,322
1,094,015
49,781,241
5,813,545
47,739,489
6,172.632
307,536
590
22,011,724
26,017,074
1,229,153
370,699
645,973
2,093,631
1,008,299
8,098,858
36,943,178
1 1 ,387,320
673,190
6,144
4,293,887
30,286,376
21,704,129
100,000
11,119,887
123,893
1,182,053
4,497,469
80,968
17,564,110
15,183,104
17,399,423
353,419,912
C-12
CITY OF CARLSBAD
CAPITAL FUNDS
PROJECTED FUND BALANCES FOR FY 2006-2007
FUND
BTD#2 - POINSETTIA LANE/AVIARA PKWY
BTD#3 - CANNON ROAD WEST
CFD#1 -CITYWIDE
GAS TAX
GENERAL CAPITAL CONST-
GOLF COURSE
GRANTS - FEDERAL
GRANTS - STATE
INFRASTRUCTURE REPLACEMENT
OTHER
PARK FEE ZONES 5,13,16
PARK-IN-LIEU NE
PARK-IN-LIEU NW
PARK-IN-LIEU SE
PARK-IN-LIEU SW
PLANNED LOCAL DRAIN'G
PUBLIC FACILITIES FEE
RANCHO SANTA FE ROAD PROJECT
REDEVELOPMENT VILLAGE
REDEVELOPMENT SCCRDA
SEWER BENEFIT AREAS
SEWER CONNECTION
SEWER REPLACEMENT
TDA
TRAFFIC IMPACT FEE
TRANSNET/BIKE
TRANSNET/HIGHWAY
TRANSNET/LOCAL
TRANSNET/STP
WATER - MAJOR FACILITY
WATER - RECYCLED WATER
WATER - REPLACEMENT
TOTAL
JULY 1,2006
PROJECTED
BALANCE
8,490,322
1,094,015
49,781,241
5,813,545
47,739,489
6,172,632
307,536
590
22,01 1 ,724
26,017,074
1,229,153
370,699
645,973
2,093,631
1,008,299
8,096,858
36,943,178
1 1 ,387,320
673,190
6,144
4,293,887
30,286,376
21,704,129
100,000
11,119,887
1 23,893
1,182,053
4,497,469
80,968
17,564,110
15,183,104
17,399,423
353,419,912
ESTIMATED
REVENUES
277,574
0
3,135,130
1 ,857,654
1 ,750,000
0
297,682
0
4,483,000
0
123,026
0
142,767
133,645
133,645
422,023
10,735,237
11,816,045
100,000
0
161,250
6,795,882
2,460,000
0
1,009,139
0
0
6,734,568
0
845,911
0
17,410,723
70,824,902
6/30/2006
CONTINUING
APPROPR.
349,302
433,845
4,544,417
1,577,998
16,489,317
3,572,632
307,536
0
3,641,008
22,700,923
0
43,550
0
0
219,100
2,909,904
30,125,602
6,590,112
673,190
6,144
1,125,778
14,171,587
12,512,073
100,000
3,752,768
110,995
975,354
3,587,198
0
4,727,070
683,104
7,804,322
143,734,829
7/1/2006
NEW
APPROPR.
0
0
1 ,660,000
65,000
8,490,842
2,600,000
297,682
0
200,000
220,000
0
0
0
1,250,000
0
0
9,832,157
0
567,044
0
0
955,944
1 ,045,057
0
370,000
0
0
6,638,568
0
54,425
14,500,000
54,425
48,801,144
2006-2007
TOTAL CIP
APPROPR.
349,302
433,845
6,204,417
1,642,998
24,980,159
6,172,632
605,218
0
3,841 ,008
22,920,923
0
43,550
0
1,250,000
219,100
2,909,904
39,957,759
6,590,112
1,240,234
6,144
1,125,778
15,127,531
13,557,130
100,000
4,122,768
110,995
975,354
10,225,766
0
4,781 ,495
15,183,104
7,858,747
192,535,973
JUNE 30, 2007
PROJECTED
BALANCE
8,418,594
660,170
46,711,954
6,028,201
24,509,330
0
0
590
22,653,716
3,096,151
1,352,179
327,149
788,740
977,276
922,844
5,610.977
7,720,657
16,613,253
(467,044)
0
3,329,359
21,954,727
10,606,999
0
8,006,257
12,898
206,699
1,006,271
80,968
13,628,527
0
26,951 ,399
231 ,708,841
C-13
CITY OF CARLSBAD
CAPITAL FUNDS
REVENUES ACTUAL AND ESTIMATED
FUND
BTD#2 - POINSETTIA LANE/AVIARA PKWY
BTD#3 - CANNON ROAD WEST
CFD#1 -CITYWIDE
GAS TAX
GENERAL CAPITAL CONST.
GOLF COURSE
GRANTS - FEDERAL
GRANTS - STATE
INFRASTRUCTURE REPLACEMENT
OTHER
PARK FEE ZONES 5,13,16
PARK-IN-LIEU NE
PARK-tN-LIEU NW
PARK-IN-LIEU SE
PARK-IN-LIEU SW
PLANNED LOCAL ORAIN'G
PUBLIC FACILITIES FEE
RANCHO SANTA FE ROAD PROJECT
REDEVELOPMENT VILLAGE
REDEVELOPMENT SCCRDA
SEWER BENEFIT AREAS
SEWER CONNECTION
SEWER REPLACEMENT
TDA
TRAFFIC IMPACT FEE
TRANSNET/BIKE
TRANSNET/HIGHWAY
TRANSNET/LOCAL
TRANSNET/STP
WATER - MAJOR FACILITY
WATER - RECYCLED WATER
WATER - REPLACEMENT
TOTAL CAPITAL FUNDS
2002-2003
ACTUAL
REVENUE
926,437
404,647
6,500,700
1,851,118
36,905,004
600,000
208,914
244,735
4,114,930
2,352,413
64,865
245,976
1 ,520,779
475,468
9,593
739,807
6,436,638
14,050,018
18,552
146,305
1,308,913
4,855,445
3,115,527
302,968
1,762,612
113,689
1,205,103
2,878,396
15,933
2,192,288
6,869,702
4,667,424
107,104,899
2003-2004
ACTUAL
REVENUE
2,082,421
-
4,724,143
1 ,785,785
558.927
0
361,048
52,028
3,946,110
11,111,949
47,366
125,004
514,627
30,554
35,582
1,241,432
5,224,343
4,691,448
7,547
245,691
557,429
1,813,446
4,198,825
78,572
975,812
1 10,471
14,861
4,120,403
1,479
3,064,296
9,009,877
2,877,307
63,608,783
2004-2005
ACTUAL
REVENUE
1 ,998,341
44,911
7,100,722
1,955,691
2,459,316
354,593
667,538
1,852
4,405,430
29,398,816
99,420
48,251
50,048
1,186,959
462,471
1 ,71 1 ,440
10,023,947
5,191,343
1 ,445,277
584,004
801,202
2,416,264
1,641,162
5,325
2,014,264
2,797
47,046
2,873,656
8,576
5,164,198
4,678,829
1,393,946
90,237,635
2005-2006
ESTIMATED
REVENUE
1,615,047
94,439
4,880,664
2,069,211
3,375,207
44,848,207
1 ,874,459
400,953
5.030,519
1,108,797
342,701
174,235
63,085
391,602
371,139
828,289
6,544,033
5,075,094
715,000
0
869,769
2,079,146
3,944,496
100,000
2,046,602
157,221
42,451
2,546,943
10,446
3,437,522
27,613,757
4,392,440
127,043,474
2006-2007
ESTIMATED
REVENUE
277,574
0
3,135,130
1,857,654
1,750,000
0
297,682
0
4,483,000
0
123,026
0
142,767
133,645
133,645
422,023
10,735,237
11,816,045
100,000
0
161,250
6,795,882
2,460,000
0
1,009,139
0
0
6,734,568
0
845,911
0
17,410,723
70,824,902
Note: Revenues include interfund loans and transfers in.
C-14
CITY OF CARLSBAD
CAPITAL FUNDS
BUDGET EXPENDITURE SCHEDULE
FUND
BTD#2 - POINSETTIA LANE/AVIARA PKWY
BTD#3 - CANNON ROAD WEST
CFD#1 -CITYWIDE
GAS TAX
GENERAL CAPITAL CONST
GOLF COURSE
GRANTS - FEDERAL
GRANTS - STATE
INFRASTRUCTURE REPLACEMENT
OTHER
PARK FEE ZONES 5,13,16
PARK-IN-LIEU NE
PARK-IN-LIEU NW
PARK-IN-LIEU SE
PARK-IN-LIEU SW
PLANNED LOCAL DRAIN'G
PUBLIC FACILITIES FEE
RANCHO SANTA FE ROAD PROJECT
REDEVELOPMENT VILLAGE
REDEVELOPMENT SCCRDA
SEWER BENEFIT AREAS
SEWER CONNECTION
SEWER REPLACEMENT
TDA
TRAFFIC IMPACT FEE
TRANSNET/BIKE
TRANSNET/HIGHWAY
TRANSNET/LOCAL
TRANSNET/STP
WATER - MAJOR FACILITY
WATER - RECYCLED WATER
WATER - REPLACEMENT
TOTAL CAPITAL FUNDS
2003-2004
ACTUAL
1,089,644
366,929
563,394
3,069,646
702,114
93,341
208,510
475,336
1,290,712
597,594
14,447
59,593
366,504
4,379,059
0
574,220
3,758,660
6,849,077
53,069
0
1,219,939
2,337,279
955,688
136,933
402,01 1
70,104
128,474
1,030,601
466,421
1 ,839,043
8,325,047
3,155,390
44,598,779
2004-2005
ACTUAL
1,371,674
1,228,385
385,960
509,878
1 ,959,899
394,043
361,452
291 ,454
336,293
593,270
452
18,626
704,000
0
0
957,271
2,885,404
11,832,529
877,633
0
937,912
2,212,199
1 ,604,260
160,780
147,986
45,776
64,266
4,180,696
69,533
2,720,043
10,516,313
501,338
47,869,325
2005-2006
ESTIMATED
116
65,480
338,058
3,698,154
5,423,855
42,405.494
1,767,787
432,439
1,457,343
6,625,960
0
606,751
0
0
0
2,155,942
8,352,408
8,296,945
41,810
257,206
844,931
2,495,516
2,885,463
0
1,096,007
227,747
87,696
5,321,024
228,369
833,933
10,941,771
3,297,142
110,185,347
2005-2006
CONTINUING
APPROPR.
349,302
433,845
4,544,417
1 ,577,998
16,489.317
3,572,632
307,536
0
3,641,008
22,700,923
0
43,550
0
0
219,100
2,909,904
30,125,602
6,590,112
673,190
6,144
1,125,778
14,171,587
12,512,073
100,000
3,752,768
110,995
975,354
3,587,198
0
4,727,070
683,104
7,804,322
143,734,829
2006-2007
NEW
APPROPR.
0
0
1,660,000
65,000
8,490,842
2,600,000
297,682
0
200,000
220,000
0
0
0
1,250,000
0
0
9,632,157
0
567,044
0
0
955,944
1,045,057
0
370,000
0
0
6,638,568
0
54,425
14,500,000
54,425
48,801,144
2006-2007
TOTAL CIP
APPROPR.
349,302
433,845
6,204,417
1,642,998
24,980,159
6,172,632
605,218
0
3,841,008
22,920,923
0
43,550
0
1,250,000
219,100
2,909,904
39,957,759
6,590,112
1,240,234
6,144
1,125,778
15,127,531
13,557,130
100,000
4,122,768
1 10,995
975,354
10.225,766
0
4,781,495
15,183,104
7,858,747
192,535,973
m
m
m
mm
m
m
m
M
I*C-15
Final 2006-07 Capital Improvement Program
PROJECT TITLE
CIVIC PROJECTS
ADMINISTRATIVE FACILITIES
CIVIC CENTER
CITY ADMIN TRAINING FACILITY (PRE-DESIGN) - PROP C
PUBLIC WORKS CENTER
PUBLIC WORKS CENTER
PUBLIC WORKS CENTER
POLICE & FIRE FACILITIES
POLICE CAD IMPLEMENTATION
FIRE STATION #3 RELOCATION
FIRE STATION #5 STORAGE BUILDING/RESTROOMS
FIRE STATION #6 (PERMANENT)
PUBLIC SAFETY TRAINING FACILITY - PROP C
LIBRARY FACILITIES
LIBRARY EXPANSION (COLE)
LIBRARY EXPANSION (COLE)
LIBRARY EXPANSION (LEARNING CENTER - ADVANCE)
LIBRARY EXPANSION (LEARNING CENTER - ADVANCE)
LIBRARY EXPANSION (LEARNING CENTER)
MISCELLANEOUS CITYWIDE PROJECTS
PROPOSITION C PROJECTS
COASTAL RAIL TRAIL (CMAQ)
COASTAL RAIL TRAIL
COASTAL RAIL TRAIL - CORRIDOR ENHANCEMENT
COASTAL RAIL TRAIL
BICYCLE MASTER PLAN
PEDESTRIAN MASTER PLAN
PEDESTRIAN MASTER PLAN
CFD#1 ADMINISTRATION
OPPORTUNISTIC SAND
PUBLIC WORKS INVENTORY AND FAC MAINT PROGRAM
STREETSCAPE IMPROVEMENTS
VILLAGE PUBLIC PARKING ENHANCEMENT PROGRAM
SUBTOTAL CIVIC PROJECTS
FACILITIES MAINTENANCE
BEACH ACCESS STAIRS REPLACEMENT
COLE LIBRARY HVAC REPLACEMENT
REPAIR RECOATING GUARDRAIL PAR BRIDGE AT CARLSBAD BLVD
HOLIDAY PARK - RESTROOM IMPROVEMENTS
LAGUNA RIVIERA PARK RESTROOM REPLACEMENT
SENIOR CENTER COURTYARD LANDSCAPING
STAGECOACH PARK PICNIC SHELTER
STAGECOACH PARK SYNTHETIC TURF
TOT LOT IMPROVEMENTS
SUBTOTAL FACILITIES MAINTENANCE
FUND
CFD#1
GCC
CFD#1
WATER REPL
SEWER REPL
GCC
PFF
GCC
PFF
GCC
CFD#1
PFF
GCC
CFD#1
OTHER
GCC
FEDGRNT
TRANSNET/BIKE
GCC
OTHER
TRANSNET/BIKE
TDA
GCC
CFD#1
OTHER
GCC
REDVL VILLAGE
REDVL VILLAGE
IRF
IRF
GCC
IRF
IRF
GCC
GCC
GCC
IRF
TOTAL
BUDGET
25,157,346
100,000
16,111,792
6,686,407
3,601 ,004
2,312,228
6,600,000
316,600
5,400,000
950,000
4,580,016
9,832,400
600,000
4,491 ,837
1,048,163
22,71 1 ,000
4,413,784
221,801
0
184,176
150,000
1 00,000
150,000
1,100,000
57,240
404,992
400,000
850,000
118,530,785
517,500
1.319,790
130,000
530.808
260,000
30,000
100,000
1,718,000
327,260
4,933,358
PRIOR
EXP/ENC
-
1,158,273
-
-
1,841,446
-
313,250
408,185
75,612
-
.
57,41 3
957,801
4,106,248
204,51 1
175,785
56,295
-
-
57,240
298,082
-
9,710,141
73,956
1 ,235,656
-
299,763
3.488
21,206
2,537
1 ,673,884
480
3,310,970
C-16
Final 2006-07 Capital Improvement Program
BALANCE YEAR 1 YEAR 2 YEARS YEAR 4 YEAR 5 YEAR 6-10 BUILDOUT
FORWARD 2006-3007 2007-2008 2008-2009 2009-2010 2010-2011 2011-2016 2016-2021
100,000
1 ,549,993
-
470,782
-
3,350
4,991,815
874,388
-
600,000
2,884,424
362
307,536
17,290
-
8,391
93,705
100,000
1 50,000
110,000
-
106,910
-
12,368,946
443,544
84,134
130,000
231 ,045
256,512
8,794
97,463
44,116
326,780
1,622,388
25,157,346
13,403,526
6,686,407
3,601,004
1 ,000,000 460,000 5,040,000 100,000
4,580,016
9,832,400
1 ,550,000
90,000
22,711,000
110,000 110,000 110,000 110,000 110,000 440,000
100,000 300,000
850,000
2,850,000 410,000 24,260,936 30,307,346 210,000 24,001,000 14,412,416
-
C-17
Final 2006-07 Capital Improvement Program
PROJECT TITLE
PARK PROJECTS
CITYWIDE PARKS
BUSINESS PARK RECREATIONAL FACILITY
CARLSBAD MUNICIPAL GOLF COURSE
SENIOR CTR EXPANSION - 1ST FLOOR
SENIOR CTR EXPANSION - 2ND FLOOR
LAKE CALAVERA TRAILS MASTER PLAN/CONSTRUCTION
VETERAN'S MEMORIAL PARK
NORTHWEST QUADRANT PARKS
PINE AVENUE PARK - PHASE I
PINE AVENUE PARK - PINE COMMUNITY BUILDING - PHASE II
PINE AVENUE PARK - PINE COMMUNITY BUILDING - PHASE II
NORTHEAST QUADRANT PARKS
HIDDEN CANYON PARK (22-3 ACRES)
PARK SITE ACQUISITION (1 5 ACRES) NE QUADRANT PARK
PARK SITE DEVELOPMENT (15 ACRES)
SOUTHWEST QUADRANT PARKS
AVIARA COMMUNITY PARK (24.25 ACRES) '
AVIARA COMMUNITY PARK COMMUNITY BUILDING
AVIARA COMMUNITY PARK COMMUNITY BUILDING
AVIARA REIMBURSEMENT AGREEMENT
POINSETTIA COMMUNITY PARK - PHASE 11
SOUTHEAST QUADRANT PARKS
ALGA NORTE PARK - PHASE 1 (30 ACRES)
ALGA NORTE PARK - PHASE II (POOL)
ALGA NORTE PARK - PHASE II (POOL) PROP C FUNDS
LEO CARRILLO PARK - PHASE III
LEO CARRILLO PARK - PHASE III
LEO CARRILLO PARK • EROSION CONTROL
CARRILLO BARN RESTORATION
LEO CARRILLO - HISTORIC BARN (50% GRANT)
SUBTOTAL PARK PROJECTS
DRAINAGE PROJECTS
AGUA HEDIONDA CHANNEL (PLDA "B")
AVIARA PARKWAY STORM DRAIN REIMBURSEMENT (PLDA "C")
CARLSBAD BLVD STORM DRAIN REPLACEMENT
CALLE GAVANZO DRAINAGE
COLLEGE BLVD/CANNON RD (BJ AND CALAVERA CR. CHANNEL)
COLLEGE BLVD/CANNON RD (BASIN BJB - REIMB./PLDA 'B") (FEMA + PLD)
COLLEGE BLVD. BRIDGE FACILITY BL (REIMB./PLDA 'B")
FARADAY/MELROSE DRAINAGE FACILITIES (PLDA "B")
GABIANO LANE STORM DRAIN MODIFICATION
HIGHLAND DRIVE - BETWEEN PINE & BASSWOOD
KELLY DRIVE CHANNEL REPAIR
MASTER PLAN UPDATE
MISCELLANEOUS MASTER DRAINAGE FACILITIES
FUND
ZONES
GOLF COURSE
REDVL VILLAGE
GCC
GCC
CFD#1
PFF
PIL-NW
PFF
PIL-NE
PFF
PIL-NE
PFF
PFF
PIL-SW
PIL-SW
PFF
PFF
PFF
GCC
PFF
PIL-SE
GCC
PFF
GCC
PLD
PLD
IRF
GCC
PLD
PLD
PLD
PLD
GAS TAX
GCC
IRF
PLD
PLD
TOTAL
BUDGET
3,103,900
51,323,681
1 ,082,044
529,162
598,750
21,672,786
7,082,000
1,664,130
7,360,210
1,886,766
4,550,000
4.000,000
10,700,000
7,117,834
2,516,875
238,000
14,115,481
15,912,570
12,099,695
1 1 ,239,000
1,987,400
836,800
180,000
33,000
500,000
1 82,330,084
1 ,680.522
378,880
80,000
62,500
2,778,833
830,910
1,783,000
300,000
35,000
240,000
895,000
454,933
10.936.000
PRIOR
EXP/ENC
45,151,049
41,810
20.950
40,364
-
6,756,928
-
-
1,843,216
482
-
10,649,737
-
18,900
1,198
925,075
500,000
237,310
-
-
4,824
32,970
58,193
66,283,006
1,521,909
378,880
-
-
396,279
788,168
-
-
6,273
.
428,938
-
C-18
Final 2006-07 Capital Improvement Program
BALANCE YEAR 1 YEAR 2 YEAR 3 YEAR 4 YEAR 5 YEAR 6-10 BUILDOUT
FORWARD 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 2011-2016 2016-2021
3,572,632
573,190
308,050
456,636
.
325,072
-
-
43,550
4,549,518
-
50,263
-
219,100
998,802
1 1 ,636,233
6,208,000
11,001,690
-
-
175,176
30
336,877
40,454,819
158,613
-
80,000
-
2,382,554
42,742
-
300,000
35,000
36,927
25,995
-
3,103,900
2,600,000
467,044
200,162
101,750
10,836,393 10,836,393
1,664,130
563,794 6,796,416
4,000,000
7,117,834
2,516,875
89,200 882,824 12,143,457
3,351 ,262
5,391 ,695
1.987,400
836,800
104,930
12.306.043 - - 563.794 9,343,370 22,979,850 30,399,202
62.500
1,783,000
1 96,800
200,000 240,000 455,000
10,936,000
C-19
Final 2006-07 Capital Improvement Program
PROJECT TITLE
MISCELLANEOUS ROAD SUBDRAINS
PARK DRIVE AND TAMARACK AVENUE STORM DRAIN (PLDA "B1)
RIDGECREST DRAINAGE IMPROVEMENTS
ROMERIA DRAINAGE IMPROVEMENTS
TAMARACK AND ECR STORM DRAIN AND SILT. BASIN (RElMB./PLDA "B')
CYNTHIA LANE STORM DRAIN
LA COSTA AVE STORM DRAIN REPLACEMENT
SUBTOTAL DRAINAGE PROJECTS
SEWER PROJECTS
ENCINA WATER POLLUTION CONTROL FACILITY
BUILDING IMPROVEMENTS
CAPITAL ACQ/REPL/REHAB AND STAFFING
PHASE IV EXPANSION - DEBT SERVICE
PHASE V EXPANSION
SEWER COLLECTION SYSTEM
AVENIDA ENCINAS GRAVITY SEWER
BUENA VISTA LIFT STATION FORCE MAIN
BUENA VISTA LIFT STATION
CARLSBAD TRUNK SEWER REACHES VCT1 A, VCT1 B, VCT1C (SBA HA")
FARADAY AVENUE - ORION TO MELROSE SEWER
FOREST GRAVITY SEWER
HOME PLANT - PIPELINE REPLACEMENT
HOME PLANT LIFT STATION REHABILITATION
LA COSTA MEADOWS SEWER EXTENSION
LA GOLONDRIA SEWER EXTENSION
NORTH AGUA HEDIONDA INTERCEPTOR REHAB - EAST SEGMENT
NORTH AGUA HEDIONDA INTERCEPTOR - WEST SEGMENT
NORTH AGUA HEDIONDA TRUNK SEWER REACH NAHT1 A
NORTH BATIQUITOS INTERCEPTOR REHABILITATION
NORTH BATIQUITOS SEWAGE LIFT STATION MODIFICATIONS
POINSETTIA SEWAGE LIFT STATION ODOR/NOISE ABATEMENT
SEWER LIFT STATION REMOVALS - GATESHEAD, VILLAS, SIMSBURY, VANCOUVER
SEWER LIFT STATION REPAIRS AND UPGRADES
SEWER LINE REFURBISHMENTS/REPLACEMENT
SEWER MASTER PLAN/CONNECTION FEE UPDATE
SEWER MONITORING PROGRAM
SOUTH AGUA HEDIONDA LIFT STATION AND FORCE MAIN
VISTA/CARLSBAD INTERCEPTOR AGUA HEDIONDA LIFT STATION (VC12)
VIST A/CARLSBAD INTERCEPTOR REACH VC1 1 B
VISTA/CARLSBAD INTERCEPTOR REACH VC13 TO VC15
VISTA/CARLSBAD INTERCEPTOR REHAB REACHES 1 AND 2
VISTA/CARLSBAD INTERCEPTOR REPLACEMENT REACH 3
BUENA INTERCEPTOR SEWER IMPROVEMENTS
TERRAMAR LIFT STATION EMERGENCY GENERATOR
SUBTOTAL SEWER PROJECTS
WATER DISTRIBUTION SYSTEM
"D" RESERVOIR - PHASE II
FUND
GAS TAX
PLD
GCC
GCC
PLD
IRF
IRF
SEWER REPL
SEWER REPL
SEWER CONN
SEWER CONN
SEWER REPL
SEWER CONN
SEWER CONN
SEW BENEF
SEWER REPL
SEWER REPL
SEWER REPL
SEWER REPL
SEWER REPL
SEWER REPL
SEWER REPL
SEWER REPL
SEWER REPL
SEWER REPL
SEWER REPL
SEWER REPL
SEWER REPL
SEWER REPL
SEWER REPL
SEWER REPL
SEWER CONN
SEW BENEF
SEWER CONN
SEWER CONN
SEWER CONN
SEWER REPL
SEWER CONN
SEWER REPL
SEWER REPL
WATER CONN
TOTAL
BUDGET
485,000
610,000
1 17,500
274,000
1,279,000
100,000
492,150
23,813,228
4,099,190
10,577,323
8,391,592
8,262,660
266,963
1,440,133
632,132
522,167
110,200
900,000
440,000
650,000
286,358
654,000
620,000
4,177,751
1,863,156
1,199,000
647,193
293,800
400,000
1 ,360,380
5,974,600
354,200
372,000
8,827,415
9,127,159
3,549,000
13,515,200
830,975
2,688,220
2,340,000
205,958
95,578.725
5,978,099
PRIOR
EXP/ENC
438
-
-
-
-
3,520,885
591,787
296,453
395,286
-
629,271
.
50,425
786,677
171
-
682
2,348
342,564
813,541
-
109,395
626,028
.
434,285
29,824
.
-
7,701,637
90,099
5,649
113,260
355,560
.
1 06,909
13,481,851
C-20
Final 2006-07 Capital Improvement Program
BALANCE YEAR 1 YEAR 2
FORWARD 2006-2007 2007-2008
484,562
-
.
100,000
492,150
4,138,543
3,507,403
828,580
-
7,867,374
2,861
-
59,775
113,323
439,829
209,318
651,652
277,436
3,364,210
-
1,089,605
21,165
50,000
-
1 46,095
900,176
-
42,000
1,125,778
1,029,261
3,543,351
1 .686,740
475,415
353,091
25,000
27,809,438
YEARS YEAR 4 YEAR 5 YEAR 6-10 BUILDOUT
2008-2009 2009-2010 2010-2011 2011-2016 2016-2021
610,000
117,500
274,000
1 ,279,000
654,000 436,800 455,000 - - 2,393,000 12.215,000
715,057 889,670
933,944 935,507
500,572 541,162 500,000 2,835,206 3,470,623
937,169 933,006 931,418 3,720,548
266,963
1,440,133
100,001 422,166
650,000
76,358
119,474 1 ,743,682
243,800
400,000
80,000 100,000 100,000 500,000
330,000 330,000 330,000 330,000 330,000 1 .650,000 1 ,744,600
354,200
22,000 22,000 22,000 22.000 22,000 110,000 110,000
1 05.269 7.902,530
11,715,200
73,220 523,000 2,092,000
1 ,880,000
180,958
2,001,001 17,888,419 12,038,953 4,018,168 1,983,419 9,592,120 6,765,356
5,978,099
C-21
Final 2006-07 Capital Improvement Program
PROJECT TITLE
"D" RESERVOIR - PHASE II
"D" RESERVOIR - BLACKRAIL ROAD IMPROVEMENTS
"D" RESERVOIR IMPROVEMENTS
AVIARA PARKWAY AT PLUM TREE
CALAVERA HILLS WATER BOOSTER STATION STANDBY GENERATOR
CANNON ROAD EAST OF EL CAMINO REAL - Reimb
CARLSBAD BOULEVARD - SOUTH OF AVENIDA ENCINAS
COLLEGE BOULEVARD - CANNON RD TO CARLSBAD VILLAGE DR - Reimb
COLLEGE BOULEVARD - CANNON TO BADGER LANE
COLLEGE BOULEVARD (ECR TO CANNON ROAD) - Reimb
COLLEGE BOULEVARD- MAERKLE RESERVOIR TO AQUA HEDIONDA CREEK
CRESTVIEW DRIVE TRANSMISSION MAIN
DEMOLITION OF WATER FACILITIES AT PAJAMA DRIVE
DESALINATION GROUNDWATER/SEAWATER STUDY
EL CAMINO REAL - PALOMAR AIRPORT ROAD SOUTH
EL CAMINO REAL BETWEEN COLLEGE AND JACKSPAR
EL CAMINO REAL CROSSING AT KELLY DRIVE
EL CAMINO REAL TRANSMISSION MAIN - LISA STREET TO KELLY DRIVE
EL CAMINO REAL TRANSMISSION MAIN FROM FARADAY TO COUGAR DRIVE
EL CAMINO REAL/CARLSBAD VILL DR PIPELINE REPL.
EL FUERTE - NORTH OF LOKER - Reimb
EL FUERTE - ALGA ROAD TO POINSETTIA LANE - Reimb
EL FUERTE - POINSETTIA LANE TO PALOMAR AIRPORT ROAD - Reimb
EL FUERTE AND CORINTIA STREET
FARADAY AVENUE - ORION TO MELROSE WATERLINE - Reimb
FARADAY AVENUE EXTENSION - Reimb
FOUSSAT ROAD WELL ABANDONMENT
LAKE CALAVERA RESERVOIR IMPROVEMENTS
MAERKLE PUMP STATION IMPROVEMENTS
MAERKLE PUMP STATION IMPROVEMENTS
MAERKLE RESERVOIR STORAGE (TAP #2)
MARRON ROAD - PRESSURE REGULATING STATION TO OCEANSIDE
MASTER PLAN UPDATE
MELROSE DRIVE - PALOMAR AIRPORT ROAD TO FARADAY - Reimb
MISCELLANEOUS PIPELINE REPLACEMENT PROJECTS
MISCELLANEOUS STORAGE TANK REPAIRS
MISCELLANEOUS WATER RESERVOIR FENCING
OCEANSIDE INTERTIE UPGRADE
PAR/ECR PUMP STATION
PAR/ECR PUMP STATION
POINSETTIA LANE - EL CAMINO REAL TO SKIMMER CT (Reimb}
POINSETTIA LANE - SKIMMER CT TO CASSIA
POINSETTIA LANE - SKIMMER CT TO CASSIA
POINSETTIA LANE EAST OF BLACK RAIL ROAD 1 2"
POINSETTIA LANE EAST OF BLACK RAIL ROAD 1 2"
PRESSURE REDUCING STATION - SYCAMORE CREEK
PRESSURE REGULATING STATION - CANNON AND COLLEGE - Reimb
RANCHO CARRILLO OVERSIZING/EXTENSION
RANCHO SANTA FE RD PIPELINE REPLACEMENT
FUND
WATER REPL
WATER REPL
WATER REPL
WATER REPL
WATER CONN
WATER CONN
WATER REPL
WATER CONN
WATER CONN
WATER CONN
WATER REPL
WATER REPL
WATER REPL
WATER REPL
WATER REPL
WATER CONN
WATER CONN
WATER CONN
WATER REPL
WATER REPL
WATER CONN
WATER CONN
WATER CONN
WATER REPL
WATER CONN
WATER CONN
WATER REPL
WATER REPL
WATER CONN
WATER REPL
WATER CONN
WATER CONN
WATER CONN
WATER CONN
WATER REPL
WATER REPL
WATER REPL
WATER REPL
WATER CONN
WATER REPL
WATER CONN
WATER REPL
WATER CONN
WATER CONN
WATER REPL
WATER CONN
WATER CONN
WATER CONN
WATER REPL
TOTAL
BUDGET
1,992,630
367,000
1 56,000
459,612
468,817
760,800
886,171
700,000
746,949
487,436
3,758,520
150,519
60,000
719,260
3,225,000
691,600
104,000
470,000
774,100
65,000
148,750
2,000,000
1,141,000
1 56,272
97,210
749,773
202,500
3,767,273
747,100
747,100
13,284,514
715,464
47,800
796,300
1 ,847,051
161,000
120,399
110,700
997,350
990,350
235,141
456,161
357,732
214.953
214,848
117,257
250,000
93,700
773,000
PRIOR
EXP/ENC
-
162,575
148,271
-
-
-
-
509,868
.
-
-
-
-
-
2,331.297
65,549
20,000
50,000
122,940
1 3,000
.
1,029,532
.
-
1 1 ,739
-
190.278
773,753
-
-
-
-
-
-
219.362
-
13,256
-
800,776
965,512
-
-
-
-
-
-
184,501
55,375
662,807
C-22
Final 2006-07 Capital Improvement Program
BALANCE YEAR 1 YEAR 2 YEAR 3 YEAR 4 YEAR 5 YEAR 6-10 BUILDOUT
FORWARD 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 2011-2016 2016-2021
.
204,425
7.729
-
760,800
-
190,132
-
.
495,000
-
60,000
-
893.703
626,051
84,000
420,000
651,160
52,000
148,750
970,468
1,141,000
-
85,471
12,222
2,443,847
-
-
-
-
-
780,638
161,000
107,143
-
196,574
24,838
-
-
-
,
-
65,499
38,325
110,193
1,992,630
459,612
52,300 416,517
886,171
746,949
487,436
376,560 2,886,960
31,380 119,139
719,260
156,272
749,773
549,673
54,425 692,675
54,425 692,675
13,284,514
715,464
47,800
796,300
418,400 428,651
110,700
235,141
456,161
357,732
214,953
214,848
117,257
C-23
Final 2006-07 Capital Improvement Program
PROJECT TITLE
SAN MARCOS BOULEVARD WEST OF SDCWA
TANGLEWOOD PRESSURE REDUCING STATION REPLACEMENT
TAP RESERVOIR EXTERIOR PAINTING
ELLERY WATER PUMP PROJECT
WATER SYSTEM INTERTIE CONNECTION
SUBTOTAL WATER DISTRIBUTION SYSTEM
FUND
WATER REPL
WATER REPL
WATER REPL
WATER REPL
WATER REPL
TOTAL
BUDGET
3,091,241
332,000
132,700
60,900
439,000
58,618,052
PRIOR
EXP/ENC
2,903,200
50,000
80.139
-
34,774
11,396,504
RECYCLED WATER PROJECTS
CHESTNUT AVENUE RECYCLED WATER LINE
ECR/TAMARACK PUMP STATION REMOVAL
1-5 RECYCLED WATER TRANSMISSION LINE
PASEO DEL NORTE RECYCLED PIPELINE REPLACEMENT
PUMP STATION REMOVAL
RECYCLED WATER PH II - FACILITY
RECYCLED WATER PH II - FLOW EQUALIZATION
RECYCLED WATER PH II - MAHR RESERVOIR IMPROV.
RECYCLED WATER PH II - PIPELINES
RECYCLED WATER PH 11 - PUMP STATIONS
SUBTOTAL RECYCLED WATER PROJECTS
WATER REPL
WATER REPL
WATER REPL
WATER REPL
WATER REPL
RECL WATER
RECL WATER
RECL WATER
RECL WATER
RECL WATER
436,100
80,019
133,305
727,200
442,700
12,130,019
4,128,280
2,957,000
21,852,521
4,918,574
47,805,718
-
.
.
490,509
12,064,613
4,127,402
2,904,903
21 ,427,509
4,778,863
45,793,799
CIRCULATION SYSTEM
TRAFFIC SIGNAL PROJECTS
TRAF SIG - ALGA ROAD AND CAZADERO
TRAP SIG - AVIARA PARKWAY-POINSETTIA LANE TO EL CAMINO REAL
TRAF SIG - AVIARA PARKWAY-POINSETTIA LANE TO EL CAMINO REAL
TRAF SIG - AVIARA PKWY AND CAMINO DE LAS ONDAS- REIMS
TRAF SIG • CALLE BARCELONA AND PASEO AVELLANO
TRAF SIG - CAMINO DE LOS COCHES AND CALLE ACERVO
TRAF SIG - CAMINO DE LOS COCHES AND LA COSTA AVENUE
TRAF SIG - CAMINO VIDA ROBLE AND YARROW DRIVE
TRAF SIG - CANNON ROAD AND AVENIDA ENCINAS
TRAF SIG - CANNON ROAD AND COLLEGE BOULEVARD
TRAF SIG - CARLSBAD BLVD & TAMARACK SIGNAL REPAIRS
TRAF SIG - CARLSBAD BOULEVARD AND CHERRY AVE
TRAF SIG - CARLSBAD VILLAGE DRIVE AND GLASGOW DR
TRAF SIG - COLLEGE BOULEVARD AND CARLSBAD VILLAGE DR - Reimb
TRAF SIG - EL CAM. REAL/PLAZA/MAR RON/HOSP WY
TRAF SIG - EL CAMINO REAL AND CHESTNUT SIGNAL REPAIRS
TRAF SIG - EL CAMINO REAL AND POINSETTIA LANE
TRAF SIG - EL CAMINO REAL AND TAMARACK SIGNAL REPAIRS
TRAF SIG - EL FUERTE ST AND RANCHO PANCHO
TRAF SIG - FARADAY AVE. AND CAMINO HILLS DRIVE
TRAF SIG - FARADAY AVENUE AND ORION STREET
TRAF SIG - FARADAY AVENUE AND PRIESTLY DRIVE
TRAF SIG - FARADAY AVENUE AND RUTHERFORD ROAD
TRAF SIG - LA COSTA AVENUE AND ESFERA STREET
TRAF SIG - LA COSTA AVENUE AND LEV ANTE
TRAF SIG - LA COSTA AVENUE/NUEVA CASTILLA
TRAF SIG - MELROSE DRIVE AND LA COSTA AVENUE
GAS TAX
OTHER
GCC
GCC
GCC
GCC
PFF
PFF
PFF
PFF
IRF
GCC
GCC
PFF
TRANSNET-LOC
IRF
PFF
IRF
GCC
GCC
TIP
GAS TAX
GCC
GAS TAX
GCC
GCC
PFF
210,000
862,649
260,000
105,000
210,000
190,000
190.000
1 90,000
150,000
210.000
230,000
190,000
210,000
210,000
1,311,000
206,000
204,250
141,000
1 90,000
190,000
289,550
303,050
190,000
190,000
210,000
190,000
190,000
-
335,447
-
.
-
139,826
-
-
-
.
-
187.050
-
1,282,166
.
179,318
-
.
.
9,653
.
-
-
-
-
C-24
Final 2006-07 Capital Improvement Program
BALANCE YEAR 1 YEAR 2 YEARS YEAR 4 YEAR 5 YEAR 6-10
FORWARD 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 2011-2016
188,041
282,000
52,561
60,900
404,226
11,718,696
133,305
236.691
442,700
65,406
878
52,097
425,012
139,711
1 ,495,800
-
267,202
160,000
105,000
50,174
-
-
150,000
230,000
-
22,950
-
28,834
206,000
24.932
141,000
-
289,550
293,397
-
-
210,000
-
-
BUILDOUT
2016-2021
108.850 1.344,633 5,512,120 15,981,415 119.139 11,719,231 715,464
436,100
80,019
436,100 80.019 ...
210,000
260,000
100,000
210.000
190,000
190,000
210,000
190,000
210,000
190,000
1 90,000
190.000
190,000
190,000
190,000
C-25
Final 2006-07 Capital Improvement Program
PROJECT TITLE
TRAP SIG - MONROE STREET AND HOSP WAY
TRAP SIG - PALOMAR AIRPORT ROAD AND MELROSE DRIVE
TRAP SIG - PASEO DEL NORTE AND CAR COUNTRY DR
TRAP SIG - POINSETTIA LANE AND BLACKRAIL ROAD
TRAP SIG - POINSETTIA LANE AND BRIGANTINE ROAD
TRAP SIG - POINSETTIA LANE AND EL FUERTE STREET (REIMB)
TRAP SIG - POINSETTIA LANE AND SNAPDRAGON DR
TRAP SIG - RANCHO SANTA FE ROAD AND CALLE JUNIPERO
TRAP SIG - RANCHO SANTA FE ROAD AND QUESTHAVEN ROAD
TRAP SIG - TAMARACK AVE. AND PONTIAC DRIVE
TRAP SIG - TAMARACK AVE. AND VALLEY STREET
TRAP SIG - TAMARACK AVENUE AND GARFIELD STREET
VIDEO DETECTION CONVERSION
SUBTOTAL TRAFFIC SIGNAL PROJECTS
FUND
GCC
PFF
GAS TAX
GCC
GCC
PFF
GAS TAX
PFF
GCC
GCC
GCC
PFF
GAS TAX
TOTAL
BUDGET
210,000
250,000
210,000
210,000
190,000
210.000
190,000
210,000
124,767
210,000
1 90,000
210,000
1 ,850,000
11,487,266
PRIOR
EXP/ENC
-
125,033
170.348
3.938
-
-
140,963
.
.
3,954
-
.
.
2,577,696
STREET PROJECTS
AVENIDA ENCINAS WIDENING - SOUTH OF PALOMAR AIRPORT ROAD
BTD#2/POINSETTIA LANE - REACH E (PARTIAL FUNDING)
BTD#2/POINSETTIA LANE - REACHES A,B,C.F,G & AVIARA PKWY REIMB
BTD#3 CANNON ROAD - FROST TO FARADAY (REIMS.)
CANNON ROAD REACH 4B
CARLSBAD BLVD. AT BREAKWATER ROAD - LEFT TURN LANE
CARLSBAD BLVD BRIDGE CONCRETE BARRIER POWER PLANT
CARLSBAD BLVD BRIDGE CONCRETE BARRIER RAILROAD
CARLSBAD BLVD. AT STATE ST - INTERSECTION ENHANCEMENT DESIGN
CARLSBAD BOULEVARD ENCINAS CREEK BRIDGE REPLACEMENT
CARLSBAD BOULEVARD ENCINAS CREEK BRIDGE REPLACEMENT
CARLSBAD BOULEVARD ENCINAS CREEK BRIDGE REPLACEMENT
CARLSBAD BOULEVARD MEDIAN-TAMARACK AVENUE TO PINE AVENUE
CARLSBAD BOULEVARD PEDESTRIAN ACCESS STUDY
CARLSBAD BOULEVARD RETROFIT OVER SDNR
CARLSBAD BOULEVARD WIDENING - CANNON TO MANZANO
CARLSBAD VILLAGE DRIVE WIDENING
COLLEGE BLVD REACH A AND CANNON REACH 4A
COLLEGE/CANNON ASSESSMENT DISTRICT
CONCRETE REPLACEMENT
CVD AND AVENIDA DE ANITA
EL CAMINO REAL AND CARLSBAD VILLAGE DRIVE
EL CAMINO REAL AND FARADAY AVENUE
EL CAMINO REAL AT AVIARA PARKWAY/ALGA ROAD
EL CAMINO REAL MEDIANS
EL CAMINO REAL MEDIANS - LA COSTA
EL CAMINO REAL WIDENING - LA COSTA AVENUE TO ARENAL ROAD
EL CAMINO REAL WIDENING - LISA STREET TO CRESTVIEW DR (LOAN)
EL CAMINO REAL WIDENING - NORTH OF COUGAR DRIVE (LOAN)
EL CAMINO REAL WIDENING - S. CHESTNUT & S. ALGA
EL CAMINO REAL WIDENING - TAMARACK AVENUE TO CHESTNUT AVE.
EL CAMINO REAL WIDENING - TAMARACK AVENUE TO CHESTNUT AVE.
FARADAY AVENUE AND MELROSE DRIVE EXTENSIONS
TIP
BTD#2
BTD#2
BTD#3
TRANSNET-HWY
REDVL SCCRDA
GCC
GCC
REDVL VILLAGE
REDVL SCCRDA
FED GRNT
TRANS NET- LOG
PFF
GCC
TRANSNET-LOC
TIF
TIP
OTHER
OTHER
IRF
GCC
TIF
TIF
TIF
PFF
PFF
TIF
TRANSNET-LOC
TRANSNET-LOC
TIP
TIF
TRANSNET-LOC
OTHER
983.000
11,050,000
1,320,729
6,194,747
1.722,303
243,150
1 ,300,000
191,000
1 00,000
41 .453
1,964,702
254,548
2,041,080
105,000
1,519,000
2.363,960
1 ,488,458
1,754,519
10,143,518
1,050,000
105,000
334,720
1,235,941
294,972
2,311,100
90,500
531 ,368
959,000
493,000
522.115
1 ,382,708
3,300,000
945,574
-
698
-
4,760,902
746,949
237,688
-
40,771
.
-
-
99,591
1 ,506,779
-
-
424,659
816,158
157
-
319,511
-
144,030
-
-
1 63,753
-
808,720
-
781 ,703
C-26
Final 2006-07 Capital Improvement Program
BALANCE YEAR 1 YEAR 2 YEAR 3 YEAR 4 YEAR 5 YEAR 6-10 BUILDOUT
FORWARD 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 2011-2016 2016-2021
.
124,967
39.652
206.062
-
210,000
49,037
-
1 24,767
206,046
-
-
517,000
3,656,570
349,302
-
433,845
975,354
5,462
-
100,000
682
-
-
-
5,409
12,221
-
-
1,329,860
9.327,360
1 ,049,843
-
916,430
-
765,470
90,500
-
-
329,247
522,115
573.988
-
163,871
210,000
190,000
210,000
190.000
210,000
67,000 277.000 247,000 307,000 435,000
67,000 467,000 607,000 307,000 3,215,000 590,000
983,000
1,600,000 9,100,000
1,320,729
600,000 400,000
280,000 140,000 880,000
191,000
297,682 1 ,667,020
38,568 215,980
2,041,080
2,363,960
1 ,488,458
105,000
334,720
294,972
1 ,401 ,600
531 ,368
959,000
3,300,000
C-27
Final 2006-07 Capital Improvement Program
PROJECT TITLE
1-5 AND LA COSTA AVENUE AUXILIARY LANES
MELROSE DRIVE AND ALGA ROAD
PALOMAR AIRPORT ROAD AND MELROSE BOULEVARD RIGHT TURN
PALOMAR AIRPORT ROAD AND MELROSE BOULEVARD RIGHT TURN
PALOMAR AIRPORT ROAD AND COLLEGE BOULEVARD
PALOMAR AIRPORT ROAD WIDENING AT PASEO DEL NORTE
PARK DRIVE, MARINA TO COVE
PAVEMENT MANAGEMENT PROGRAM
PAVEMENT MANAGEMENT PROGRAM
PAVEMENT MANAGEMENT PROGRAM (NON-JURIS FEES)
CONCRETE REPAIR WORK
POINSETTIA LANE EAST OF EL CAMINO REAL FINANCING PROGRAM
POINSETTIA LANE WIDENING (PASEO DEL NORTE TO BATIQUITOS LN)
RANCHO SANTA FE ROAD AND OLIVENHAIN IMPROVEMENTS
RANCHO SANTA FE ROAD NORTH - PHASE 1
RANCHO SANTA FE ROAD NORTH - PHASE II (BRIDGE)
RANCHO SANTA FE ROAD SOUTH
SAN MARCOS ROAD PROJECT
SIDEWALK/STREET CONSTRUCTION PROGRAM
TRAFFIC MONITORING PROGRAM
TAMARACK AND ADAMS
VALLEY AND MAGNOLIA SIDEWALKS
VALLEY AND MAGNOLIA SIDEWALKS
UNDERGROUND DIST. 17 - HARDING, ROOSEVELT
SUBTOTAL STREET PROJECTS
FUND
CFDJM
TIF
OTHER
GAS TAX
TIF
TIF
GCC
TRANSNET-LOC
GAS TAX
TRANSNET-LOC
GCC
OTHER
TIF
RSF ROAD
RSF ROAD
RSF ROAD
RSF ROAD
GCC
TIF
TIF
GCC
TIF
TRANSNET-LOC
GCC
TOTAL
BUDGET
2,000,000
566,932
130,000
65,000
167,360
525,000
145,627
58,710,348
4,701,088
12,609,000
3,750,000
28,931,541
2,210,198
3,800,000
26,406,243
18,641,000
1 ,350,000
2,424,189
3,270,672
1,280,611
48,500
315,000
315,000
509,800
231,210,274
PRIOR
EXP/ENC
.
-
-
42,308
.
14,902,452
4,541,738
.
17,327,664
-
62,740
26,069,521
17,474,870
.
2,424,189
14,423
133,867
.
.
12,050
93,857,891
LOANS TO OTHER FUNDS
GAS TAX LOAN BTD#2
GAS TAX LOAN TO BTD#3 CANNON ROAD WEST
GCC LOAN TO FARAD AY/MELROSE
GCC LOAN TO PIL-NW FOR MADISON ST PROPERTY PURCHASES
GCC LOAN TO PIL-NW FOR PINE SCHOOL ACQUISITION
GCC LOAN TO PIL-NW FOR PINE PARK PHASE II
GCC LOAN TO PIL-SE FOR ALGA NORTE LAND ACQUISITION
GCC LOAN TO PFF - ALGA NORTE POOL
GCC LOAN TO PFF - POINSETTIA TENNIS COURTS
GCC LOAN TO PFF - FIRE STATION #3 LAND ACQUISITION
GCC LOAN TO PLDA - HEDIONDA AND CALAVERA CREEK
GAS TAX LOAN TO PFF - TRAFFIC SIGNALS AND MEDIANS
PHASE II LOAN TO RECYCLED WATER
SEWER REPL TO SEW BENEF A FOR CARLSBAD TRUNK SEWER
SUBTOTAL FUTURE LOANS TO OTHER FUNDS
GAS TAX
GAS TAX
GCC
GCC
GCC
GCC
GCC
GCC
GCC
GCC
GCC
GAS TAX
WATER REPL
SEWER REPL
2,643,344
1,000,000
506,587
320,000
860,000
450,000
1 ,250,000
2,500,000
3,600,000
1 ,000,000
420,021
4,900,000
14,500,000
5,270,000
39,219,952
2,643,344
1 ,000,000
506,587
320,000
860,000
1 ,250,000
420,021
14,500,000
5,270,000
26,769,952
C-28
Final 2006-07 Capital Improvement Program
BALANCE YEAR1 YEAR 2 YEAR 3 YEAR 4 YEAR 5 YEAR 6-10 BUILDOUT
FORWARD 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 2011-2016 2016-2021
-
-
-
482,692
-
2,616,896
159,350
600.000
-
11,603,877
-
3,737,260
336,722
1,166,130
1 ,350,000
-
871 .249
96,744
-
497,750
40,469,629
-
2,000,000
566,932
1 30.000
65,000
1 67,360
145,627
2.500,000 2,500,000 2,600,000 2,648,000 2,813,000 14,065,000 14.065,000
800,000 800,000 800,000 952,000 787,000 3,935,000 3,935,000
250,000 250,000 250,000 250.000 250,000 1,250.000 1,250,000
2,210,198
300,000 210,000 75,000 300,000 300,000 1,200,000
70,000 70,000 70,000 70.000 70,000 350,000 350,000
48,500
90,000 225.000
315,000
8,031,250 7,846,500 6,960,627 4,220,000 4,220,000 23,111,420 42,492,957
450,000
2,500,000
3,600,000
1 ,000,000
4,900,000
7,100,000 - - - 450,000 - 4,900,000
C-29
Final 2006-07 Capital Improvement Program
PROJECT TITLE FUND
TOTAL PRIOR
BUDGET EXP/ENC
LOAN REPAYMENTS
BTD#2 REPAYMENT TO GAS TAX FUND
BTD#3 CANNON ROAD WEST TO GAS TAX FUND
FARADAY/MELROSE TO GCC
PIL-NW TO GCC FOR MADISON ST PROPERTY PURCHASES
PIL-NW TO GCC FOR PINE SCHOOL ACQUISITION & PHASE II
PIL-SE TO GCC FOR ALGA NORTE LAND ACQUISITION
GCC LOAN TO PFF - ALGA NORTE POOL
GCC LOAN TO PFF - POINSETTIA TENNIS COURTS
GCC LOAN TO PFF - FIRE STATION #3 LAND ACQUISITION
GAS TAX LOAN TO PFF - TRAFFIC SIGNALS AND MEDIANS
GCC LOAN TO PLDA - HEDIONDA AND CALAVERA CREEK
RECYCLED WATER TO WATER REPLACEMENT
SBA C,D,E,F TO SEW REPL FOR S AGUA HEDIONDA INTERCEPTOR
SUBTOTAL LOAN REPAYMENTS
GRAND TOTAL ALL FUNDED PROJECTS
BTD#2
BTD#3
OTHER
PIL-NW
PIL-NW
PIL-SE
PFF
PFF
PFF
PFF
PLD
RECL WATER
SEW BENEF
2.643,344
1 .000,000
506,587
320,000
1,310,000
1,250,000
2,500,000
3.600,000
1.000,000
4,900,000
420,021
14,500,000
5,270,000
39,219,952
852,747,394 276,704,695
UNFUNDED PROJECTS
PALOMAR AIRPORT ROAD WIDENING AND BRIDGE RECONSTRUCTION
CANNON LAKE PARK (6.7 ACRES)
HOSP GROVE/BUENA VISTA LAGOON REC'L IMPROVEMENTS
EL CAMINO REAL WIDENING - CASSIA RD TO CAMINO VIDA ROBLE
POINSETTIA LANE - REACH "E"
CANNON ROAD - REACH 4 - COLLEGE TO CITY LIMITS
TOTAL UNFUNDED PROJECTS
10,500.000
2,243,000
1 ,280,000
4,026,000
2,040,000
14,172,000
34,261.000
C-30
Final 2006-07 Capital Improvement Program
BALANCE
FORWARD
-
143,734,829
YEAR 1 YEAR 2 YEAR 3 YEAR 4 YEARS YEAR 6-10 BUILDOUT
2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 2011-2016 2016-2021
2.643,344
1,000,000
506,587
320,000
1,310,000
1,250,000
2,500,000
3,600,000
1 ,000,000
4,900,000
420,021
14,500,000
2,000,000 3,270,000
15,750,000 2,506,587 - 420,021 - 1,000,000 19,543,344
48.801.144 30.936,039 49,774,655 56,117.744 16.632,928 98,011,621 132,033,739
C-31
CAPITAL IMPROVEMENT PROGRAM FUND SUMMARY
BTD NO. 2 AVIARA PARKWAY - POINSETTIA LANE
BEGINNING FUND BALANCE (1)
REVENUES
DEVELOPER FEES
TOTAL REVENUES
CAPITAL PROJECTS
BTD#2 REPAYMENT TO GAS TAX FUND
BTD#2/POINSETTIA LANE - REACH E (PARTIAL FUNDING)
BTD#2/POINSETTIA LANE - REACHES A,B, C F & G & AVIARA PKWY
TOTAL PROJECT EXPENDITURES
ENDING FUND BALANCE
PRIOR
YEARS
N/A
N/A
350,000
350,000
N/A
YEAR 1 YEAR 2
2006-2007 2007-2008
8,141,020 8,418,594
277,574 288.054
277,574 288,054
8,418,594 8,706,648
YEAR 3 YEAR 4
2008-2009 2009-2010
8,706,648 7,690,976
584,328 584,328
584,328 584,328
1,600,000
1,600,000
7,690,976 8,275,304
YEAR 5 BUILDOUT
2010-2011 2011++
8,275,304 8,850,856
575,552 6,316,160
575,552 6,316,160
2,643,344
9,100,000
1,320,729
13,064,073
8,850,856 2,102,943
BTD NO. 3 CANNON ROAD WEST
BEGINNING FUND BALANCE (1)
RgygHUJ-S
DEVELOPER FEES
TOTAL REVENUES
CAPITAL PROJECTS
BTD#3 CANNON ROAD - FROST TO FARADAY (REIM6.)
BTD#3 CANNON ROAD WEST TO GAS TAX FUND
TOTAL PROJECT EXPENDITURES
ENDING FUND BALANCE
PRIOR
YEARS
N/A
N/A
5,194,747
5,194,747
N/A
YEAR 1 YEAR 2 YEAR 3 YEAR 4
2006-2007 2007-2008 2008-2009 2009-2010
660,170 660,170 141,064 179,368
80,894 38,304
80,894 38,304
600,000
600,000
660,170 141,064 179,368 179,368
YEAR 5 BUILDOUT
2010-2011 2011++
179,368 179,368
3,758,622
3,758,622
400,000
1,000,000
1,400,000
179,368 2,537,990
[1) Equal lei projected kind balance less any continuing appropriations C-32
CAPITAL IMPROVEMENT PROGRAM FUND SUMMARY
COMMUNITY FACILITIES DISTRICT NO. 1
BEGINNING FUND BALANCE (1}
REVENUES
DEVELOPER SPECIAL TAXES
TOTAL REVENUES
CAPITAL PROJECTS
CIVIC CENTER
PUBLIC WORKS CENTER
LIBRARY EXPANSION (COLE)
LIBRARY EXPANSION (LEARNING CENTER - ADVANCE)
CFD#1 ADMINISTRATION
VETERAN'S MEMORIAL PARK
1-5 AND LA COSTA AVENUE AUXILIARY LANES
TOTAL PROJECT EXPENDITURES
ENDING FUND BALANCE
(CFD 1)
PRIOR
YEARS
N/A
N/A
2,708,266
2,941,837
110,000
-
5,760,103
N/A
YEAR1
2006-2007
45,236,824
3,135,130
3,135,130
1,550,000
110,000
1,660,000
46,711,954
YEAR 2
2007-2008
46,711,954
4,459,013
4,459,013
110,000
110,000
51,060,967
YEAR 3
2008-2009
51,060,967
3,827,036
3,827,036
13,403,526
110,000
13,513,526
41^374,477
YEAR 4
2009-2010
41,374,477
2,586,078
2,586,078
25,157,346
110,000
25,267,346
18,693,209
YEARS
2010-2011
18,693,209
1,663,443
1,663,443
110,000
110,000
20,246,651
BUILDOLfT
2011++
20,246,651
14,491,860
14,491,860
-
-
4,580,016
-
440,000
21,672,786
2,000,000
28,692,802
6,045,709
RANCHO SANTA FE ROAD PROJECT
BEGINNING FUND BALANCE (1)
REVENUES
DEVELOPER SPECIAL TAXES/OTHER AGENCIES
TOTAL REVENUES
CAPITAL PROJECTS
RANCHO SANTA FE ROAD AND OLIVENHAIN IMPROVEMENTS
RANCHO SANTA FE ROAD NORTH - PHASE I
RANCHO SANTA FE ROAD NORTH - PHASE II (BRIDGE)
RANCHO SANTA FE ROAD SOUTH
TOTAL PROJECT EXPENDITURES
ENDING FUND BALANCE
PRIOR
YEARS
N/A
N/A
3,800,000
26,406,243
18,641,000
1,350,000
50,197,243
N/A
YEAR 1 YEAR 2 YEAR 3 YEAR 4 YEAR 5 8UILDOW
2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 2011++
4,797,208 16,613,253 22,123,853 22,123,853 22,123,853 22,123,853
11,816,045 5,510,600 ....
11,816,045 5,510,600 ....
16,613,253 22,123,853 22,123,853 22,123,853 22,123,853 22,123,853
(1) Equal to projected tuna Balance less any continuing appropriations C-33
CAPITAL IMPROVEMENT PROGRAM FUND SUMMARY
GAS TAX FUND
BEGINNING FUND BALANCE (1)
REVENUES
GAS TAXES
LOAN REPAYMENTS
TOTAL REVENUES
CAPITAL PROJECTS
PALOMAR AIRPORT RD S MELROSE BLVD RIGHT TURN
GABIANO LANE STORM DRAIN MODIFICATION
GAS TAX LOAN BTD#2
GAS TAX LOAN TO BTD#3 CANNON ROAD WEST
MISCELLANEOUS ROAD SUBDRAINS
PAVEMENT MANAGEMENT PROGRAM
GAS TAX LOAN TO PFF - TRAFFIC SIGNALS AND MEDIANS
TRAP SIG - ALGA ROAD AND CAZADERO
TRAF SIG - FARADAY AVENUE AND PRIESTLY DRIVE
TRAP SIG - LA COSTA AVENUE AND ESFERA STREET
TRAF SIG - PASEO DEL NORTE AND CAR COUNTRY DR
TRAF SIG - POINSETTIA LANE AND SNAPDRAGON DR
VIDEO DETECTION CONVERSION
TOTAL PROJECT EXPENDITURES
ENDING FUND BALANCE
PRIOR
YEARS
N/A
N/A
-
35,000
2,643,344
1,000,000
485,000
4,701,088
-
303,050
-
210,000
190,000
517,000
10,084,482
N/A
YEAR 1 YEAR 2 YEAR 3 YEAR 4 YEAR 5 BUILDOUT
2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 2011++
4,235,547 6,028,201 7,874,584 9,378,369 11,161,277 12,945,083
1,857,654 1,913,383 1,970,785 2,029,90B 2,090,806 24,687,804
8,543,344
1,857,654 1,913,383 1,970,785 2,029,908 2,090,806 33,231,148
65,000
-
-
4,900,000
210,000
-
190,000
-
67,000 277,000 247,000 307,000 435,000
65,000 67,000 467,000 247,000 307,000 5,545,000
6,028,201 7,874,584 9,378,369 11,161,277 12,945,083 40,631,231
GOLF COURSE FUND
BEGINNING FUND BALANCE (1)
REVENUES
BOND PROCEEDS
ADVANCES
TOTAL REVENUES
CAPITAL PROJECTS
CARLSBAD MUNICIPAL GOLF COURSE
TOTAL PROJECT EXPENDITURES
ENDING FUND BALANCE
PRIOR
YEARS
N/A
N/A
48,723,681
48,723,681
N/A
YEAR1 YEAR 2 YEAR 3 YEAR 4 YEARS BUILDOUT
2006-2007 20Q7-2D08 2008-2009 2009-2010 2010-2011 2011++
2,600,000 .....
2,600,000
2,600,000 .....
(1) Equal to projected lung1 balance less any continuing appropriations C-34
CAPITAL IMPROVEMENT PROGRAM FUND SUMMARY
GENERAL CAPITAL CONSTRUCTION (GCC)
BEGINNING FUND BALANCE (1)
REVENUES
LOAN REPAYMENTS & OTHER
TOTAL REVENUES
CAPITAL PROJECTS
CITY ADMIN TRAINING FACILITY (PRE-DES1GN) - Prop C
POLICE CAD IMPLEMENTATION
FIRE STATION #5 STORAGE BUILD IN G/RESTROOMS
PUBLIC SAFETY TRAINING FACILITY - Prop C
LIBRARY EXPANSION [LEARNING CENTER - ADVANCE)
PROPOSITION C PROJECTS
PEDESTRIAN MASTER PLAN
COASTAL RAIL TRAIL - CORRIDOR ENHANCEMENT
PUBLIC WORKS INVENTORY AND FAC MAINT PROGRAM
REPAIR RECOATING GUARDRAIL PAR BRIDGE AT CARLSBAD BLVD
SENIOR CENTER COURTYARD LANDSCAPING
STAGECOACH PARK PICNIC SHELTER
STAGECOACH PARK SYNTHETIC TURF
SENIOR CTR EXPANSION - 2ND aOOR
LAKE CALAVERA TRAILS MASTER PLAN/CONSTRUCTION
ALGA NORTE PARK • PHASE II (POOL) PROP C FUNDS
LEO CARRILLO PARK - EROSION CONTROL
LEO CARRILLO - HISTORIC BARN (50% GRANT)
CALLE GAVANZO DRAINAGE
HIGHLAND DRIVE - BETWEEN PINE & BASSWOOD
RIDGCREST DRAINAGE IMPROVEMENTS
ROMERIA DRAINAGE IMPROVEMENTS
TRAF SIG - AVIARA PARKWAY-POINSETTIA LANE TO EL CAMINO REAL
TRAF SIG - AVIARA PKWY AND CAMINO DE LAS ONOAS- REIMB
TRAF SIG - CALLE BARCELONA AND PASEO AVELLANO
TRAF SIG - CAMINO DE LOS COCHES AND CALLE ACERVO
TRAF SIG - CARLSBAD BOULEVARD AND CHERRY AVE
TRAF SIG - CARLSBAD VILLAGE DRIVE AND GLASGOW DR
TRAF SIG - EL FUERTE ST AND RANCHO PANCHO
TRAF SIG - FARADAY AVE. AND CAMINO HILLS DRIVE
TRAF SIG - FARADAY AVENUE AND RUTHERFORD ROAD
TRAF SIG - LA COSTA AVENUE AND LEV ANTE
TRAF SIG - LA COSTA AVENUE/NUEVA CASTTLLA
TRAF SIG - MONROE STREET AND HOSP WAY
TRAF SIG - POINSETTTA LANE AND BLACKRAIL ROAD
TRAF SIG - POINSETT1A LANE AND BRIGANTINE ROAD
TRAF SIG - RANCHO SANTA FE ROAD AND QUESTHAVEN ROAD
TRAF SIG - TAMARACK AVE. AND PONTIAC DRIVE
TRAF SIG - TAMARACK AVE. AND VALLEY STREET
CARLSBAD BLVD BRIDGE CONCRETE BARRIER POWER PLANT
CARLSBAD BLVD BRIDGE CONCRETE BARRIER RAILROAD
CVD AND AVENIDA DE ANITA
PEDESTRIAN MASTER PLAN
CARLSBAD BOULEVARD PEDESTRIAN ACCESS STUDY
PARK DRIVE, MARINA TO COVE
CONCRETE REPAIR WORK
SAN MARCOS ROAD PROJECT
TAMARACK AND ADAMS
UNDERGROUND D1ST. 17 - HARDING, ROOSEVELT
GCC LOAN TO FARAD AY/ MELROSE
GCC LOAN TO Pff - ALGA NORTE POOL
GCC LOAN TO PFF - POlNSETTIA TENNIS COURTS
GCC LOAN TO PFF - FIRE STATION #3 LAND ACQUISITION
GCC LOAN TO PLDA-MEDIONDA AND CALAVERA CREEK
GCC LOAN TO PIL-NW FOR MADISON ST PROPERTY PURCHASES
GCC LOAN TO PIL-NW FOR PINE SCHOOL ACQUISITION
GCC LOAN TO PIL-NW FOR PINE PARK PHASE II
GCC LOAN TO PIL-SE FOR ALGA NORTE LAND ACQUISITION
TOTAL PROJECT EXPENDITURES
PRIOR
YEARS
N/A
N/A
100,000
2,312.228
316,600
950,000
600,000
150,000
-
101,992
130,000
30,000
100,000
1,718,000
329,000
497,000
11,239,000
180,000
395,070
-
43,200
-
160,000
105,000
-
190,000
210,000
-
-
-
210,000
210,000
124,767
210,000
-
105,000
2,424,189
509,800
506,587
420,021
320,000
860,000
1,250,000
27,310,454
N/A
YEAR1
2006-2007
31,250,172
1,750,000
1,750,000
200,162
101,750
101,930
62,500
117,500
271,000
280,000
250,000
2,500,000
3,600,000
1,000,000
8,490,842
24,509,330
YEAR 2 YF_AR 3 YEAR 4 YEAR 5 BUILDOUT
2007-2008 2008-2009 2009-2010 2010-2011 2011 + +
24,509,330 24,834,617 24,308,990 25,129,011 25,179,011
1,256,587 750,000 1,170,021 750,000 11,035,000
1,256,587 750,000 1,170,021 750,000 11,035,000
22,711,000
196,800
100,000
210,000
190,000
190,000
190,000
190,000
190,000
210,000
190,000
190,000
140,000 880,000
191,000
105,000
145,627
250,000 250,000 250,000 250,000 2,500,000
48,500
450,000
931,300 1,275,627 350,000 700,000 26,961,000
24,834,617 24,308,990 25,129,011 25,179,011 9,253,011
(t) Equal to projected fund balance less any continuing approprialions C-35
CAPITAL IMPROVEMENT PROGRAM FUND SUMMARY
GRANTS - FEDERAL
BEGINNING FUND BALANCE (1)
REVENUES
CARLSBAD BOULEVARD EfJCIPJAS CREEK BRIDGE REPLACEMENT
TOTAL REVENUES
CAPITAL PROJECTS
CARLSBAD BOULEVARD ENCINAS CREEK BRIDGE REPLACEMENT
COASTAL RAIL TRAIL (CMAQ)
TOTAL PROJECT EXPENDITURES
ENDING FUND BALANCE
PRIOR
YEARS
N/A
N/A
-
4,413,784
4,413,784
N/A
YEAR 1 YEAR 2 YEAR 3
2006-2007 2007-2008 2008-2009
•
297.682 1,667,020
297,682 1,667,020
297,682 1.667,020
YEAR 4 YEAR 5 BUILDOUT
2009-2010 2010-2011 2011++
-
-
-
-
297,682 1,667,020 ....
GRANTS - STATE
PRIOR
YEARS
BEGINNING FUND BALANCE (1) N/A
GRANT REVENUE
TOTAL REVENUES
CAPITAL PROJECTS
TOTAL PROJECT EXPENDITURES
ENDING FUND BALANCE N/A
YEAR 1 YEAR 2 YEAR 3 YEAR 4 YEAR 5 BUILDOUT
2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 2011++
590 590 590 590 590 590
590 590 590 590 590 590
(1) Equal lo prodded lund balance less any continuing appropriations C-36
CAPITAL IMPROVEMENT PROGRAM FUND SUMMARY
INFRASTRUCTURE MAINTENANCE &
BEGINNING FUND BALANCE (1)
REVENUES
GENERAL FUND TRANSFER
TOTAL REVENUES
CAPITAL PROJECTS
BEACH ACCESS STAIRS REPLACEMENT
CARLSBAD BLVD STORM DRAIN REPLACEMENT
COLE LIBRARY HVAC REPLACEMENT
CYNTHIA LANE STORM DRAIN
HOLIDAY PARK - RESTROOM IMPROVEMENTS
KELLY DRIVE CHANNEL REPAIR
LA COSTA AVE STORM DRAIN REPLACEMENT
LAGUNA RIVIERA PARK RESTROOM REPLACEMENT
TOT LOT IMPROVEMENTS
TRAP SIG - -ECR AND CHESTNUT SIGNAL REPAIRS
TRAF SIG - CARLSBAD BLVD & TAMARACK SIGNAL REPAIRS
TRAF SIG - ECR AND TAMARACK SIGNAL REPAIRS
VARIOUS FACILITY CONCRETE REPAIRS
TOTAL PROJECT EXPENDITURES
ENDING FUND BALANCE
REPLACEMENT (IM&R)
PRIOR
YEARS
N/A
N/A
517,500
80,000
1,319,790
100,000
530,808
-
492,150
260,000
327,260
206,000
230,000
141,000
1,050,000
5,254,508
N/A
YEAR 1 YEAR 2 YEAR 3 YEAR 4 YEAR 5 BUILDOLfT
2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 2011++
18,370,716 22,653,716 27,164,716 32,940,717 39,500,717 46,430,717
4,483,000 4,751,000 6,231,000 6,560,000 6,930,000 69,300,000
4,483,000 4,751,000 6,231,000 6,560,000 6,930,000 69,300,000
200,000 240,000 455,000
200,000 240,000 455,000
22,653,716 27,164,716 32,940,717 39,500,717 46,430,717 115,730,717
OTHER
BEGINNING FUND BALANCE (1)
REVENUES
OTHER FINANCING SOURCES
TOTAL REVENUES
CAPITAL PROJECTS
UBRARY EXPANSION (LEARNING CENTER)
COASTAL RAIL TRAIL
OPPORTUNISTIC SAND
TRAF SIG - AVIARA PARKWAY-POINSETTIA LANE TO EL CAMINO REAL
COLLEGE BLVD REACH A AND CANNON REACH 4A
COLLEGE/CANNON ASSESSMENT DISTRICT
FARADAY AVENUE AND MELROSE DRIVE EXTENSIONS
PALOMAR AIRPORT ROAD AND MELROSE BOULEVARD RIGHT TURN
POINSETTIA LANE EAST OF EL CAMINO REAL FINANCING PROGRAM
LIBRARY EXPANSION (LEARNING CENTER!
FARADAY/MELROSE TO GCC
TOTAL PROJECT EXPENDITURES
ENDING FUND BALANCE
PRIOR
YEARS
N/A
N/A
953,163
184,176
602,649
1,754,519
10,143,518
945,574
28,931,541
-
43,520,140
N/A
YEAR 1 YEAR 2 YEAR 3 YEAR 4 YEAR 5 BUILDOUT
2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 2011++
3,316,151 3,096,151 2,589,564 2,589,564 2,329,564 2,329,564
-
-
-
-
260,000
-
-
-
130.000
90,000
506,587
220,000 506,587 - 260,000
3,096,151 2,589,564 2,589,564 2,329,564 2,329,564 2,329,564
PARK FEE ZONES 5,13,16
PRIOR
YEARS
BEGINNING FUND BALANCE (1) N/A
REVENUES
DEVELOPER FEES
TOTAL REVENUES N/A
CAPITAL PROJECTS
BUSINESS PARK RECREATIONAL FACILITY
TOTAL PROJECT EXPENDITURES
ENDING FUND BALANCE N/A
YEAR1
2006-2007
1,229,153
123,026
123,026
1,352,179
YEAR 2
2007-2008
1,352,179
149,926
149,926
1,502,106
YEAR 3
2008-2009
1,502,106
149,926
149,926
1,652,032
YEAR 4
2009-2010
1,652,032
83,790
83,790
1,735,822
YEARS
2010-2011
1,735,822
90,990
90,990
1,826,812
BUILDOUT
2011++
1,826,812
1,277,090
1,277,090
3,103,900
3,103,900
0
(1) Equal to projected fund balance less any continuing appropnaliens.C-37
CAPITAL IMPROVEMENT PROGRAM FUND SUMMARY
PARK-IN-LIEU NE
BEGINNING FUND BALANCE (1)
REVENUES
DEVELOPER FEES
TOTAL REVENUES
CAPITAL PROJECTS
HIDDEN CANYON PARK (22.3 ACRES)
PARK SITE DEVELOPMENT (15 ACRES)
TOTAL PROJECT EXPENDITURES
ENDING FUND BALANCE
PRIOR
YEARS
N/A
N/A
1,886,766
1,886,766
N/A
YEAR1
2006-2007
327,149
327,149
YEAR 2
2007-2008
327,149
2,132,974
2,132,974
2,460,123
YEAR 3
2008-2009
2,460,123
1,085,197
1,085,197
3,545,321
YEAR 4
2009-2010
3,545,321
796,524
796,524
4,341,845
YEARS
2010-2011
4,341,845
138,991
138,991
4,480,836
BUILDOUT
2011++
4,480,836
7,302,363
7,302,363
4,000,000
4,000,000
7,783,198
PARK-IN-LIEU NW
BEGINNING FUND BALANCE (1)
REVENUES
DEVELOPER FEES
TOTAL REVENUES
CAPITAL PROJECTS
PINE AVENUE PARK - PINE COMMUNITY BUILDING - PHASE II
PIL-NW TO GCC FOR MADISON ST PROPERTY PURCHASES
PIL-NW TO GCC FOR PINE SCHOOL ACQUISITION
TOTAL PROJECT EXPENDITURES
ENDING FUND BALANCE
PRIOR
YEARS
N/A
N/A
N/A
YEAR1
2006-2007
645,973
142,767
142,767
788,740
YEAR 2
2007-2008
788,740
306,949
306,949
1,095,689
YEAR 3
2008-2009
1,095,689
442,578
442,578
1,538,267
YEAR 4
2009-2010
1,538,267
149,905
149,905
1,688,172
YEARS
2010-2011
1,688,172
592,767
592,767
1,664,130
1,664,130
616,809
BUILDOUT
2011++
616,809
3,233,673
3,233,673
320,000
1,310,000
1,630,000
2,220,482
PARK-IN-LIEU SE
BEGINNING FUND BALANCE (1)
REVENUES
DEVELOPER FEES
TOTAL REVENUES
(CAPITAL PROJECTS
LEO CARRILLO PARK - PHASE III
PIL-SE TO GCC FOR ALGA NORTE LAND ACQUISITION
TOTAL PROJECT EXPENDITURES
ENDING FUND BALANCE
PRIOR
YEARS
N/A
N/A
N/A
YEAR 1
2006-2007
2,093,631
133,645
133,645
1,250,000
1,250,000
977,276
YEAR 2
2007-2008
977,276
133,645
133,645
1,110,921
YEAR 3
2008-2009
1,110,921
80,187
80,187
1,191,108
YEAR 4
2009-2010
1,191,108
80,187
80,187
1,271,295
YEARS
2010-2011
1,271,295
21,383
21,383
1,292,678
BUILDOUT
2011++
1,292,678
836,800
836,800
455,878
PARK-IN-LIEU SW
BEGINNING FUND BALANCE (1)
DEVELOPER FEES
TOTAL REVENUES
CAPITAL PROJECTS
AVIARA COMMUNITY PARK COMMUNITY BUILDING
AVIARA REIMBURSEMENT AGREEMENT
PIL-SW TO GCC FOR AVIARA PARK
TOTAL PROJECT EXPENDITURES
PRIOR
YEARS
N/A
N/A
238,000
238,000
N/A
YEAR1
2006-2007
789,199
133,645
133,645
922,844
YEAR 2
2007-2008
922,844
160,374
160,374
1,083,218
YEAR 3
2008-2009
1,083,218
454,393
454,393
1,537,611
YEAR 4
2009-2010
1,537,611
454,393
454,393
1,992,004
YEARS
2010-2011
1,992,004
443,701
443,701
2,435,706
BUILDOLTT
2011++
2,435,706
2,710,321
2,710,321
2,516,875
2,516,875
2,629,151
(1] Equal lo projected tund balance less any continuing appropnadons C-38
CAPITAL IMPROVEMENT PROGRAM FUND SUMMARY
PLANNED LOCAL DRAINAGE AREA FEES (PLDA)
BEGINNING FUND BALANCE (1)_
REVENUES
DEVELOPER FEES
LOANS
TOTAL REVENUES
CAPITALPROJECTS
AGUA HE010NDA CHANNEL (PLDA "B")
AVIARA PARKWAY STORM DRAIN REIMBURSEMENT (PLDA "C")
COLLEGE BLVD/CANNON RD (BJ AND CALAVERA CR. CHANNEL)
COLLEGE BLVD/CANNON RD (BASIN BJB - REIM6./PLDA "B") (FEMA + PLD)
COLLEGE BLVD. BRIDGE FACILITY BL (RE1MB./PLDA "B")
FARADAY/MELROSE DRAINAGE FACILITIES (PLDA "B")
MASTER PLAN UPDATE
MISCELLANEOUS MASTER DRAINAGE FACILITIES
PARK DRIVE AND TAMARACK AVENUE STORM DRAIN (PLDA "B")
TAMARACK AND ECR STORM DRAIN AND SILT. BASIN (REIMB./PLDA "B")
LOAN REPAYMENT - HEDIONDA AND CALAVERA CREEK
TOTAL PROJECT EXPENDITURES
ENDING FUND BALANCE
PRIOR
YEARS
N/A
420,021
N/A
1,680,522
378,880
2,778,833
830,910
-
300,000
454,933
-
-
-
-
6,424,078
N/A
YEAR 1
2006-2007
5,188,954
422,023
422,023
-
5,610,977
YEAR 2
2007-2008
5,610,977
422,023
422,023
-
6,033,000
YEAR 3 YEAR 4
2008-2009 2009-2010
6,033,000 6,322,300
289,300 195,050
289,300 195,050
420,021
420,021
6,322,300 6,097,330
YEARS
2010-2011
6,097,330
106,555
106,555
-
6,203,885
BUILDOUT
2011 + -*-
6,203,885
8,034,202
8,034,202
-
1,783,000
10,936,000
610,000
1,279,000
14,608,000
(369,913)
PUBLIC FACILITY FEE FUND (PFF)
BEGINNING FUND BALANCE (1)
REVENUES
DEVELOPER FEES
LOANS
PROP 12 AND PROP 40 GRANT FUNDS
TOTAL REVENUES
CAPITAL PROJECTS
FIRE STATION *3 RELOCATION
FIRE STATION *6 (PERMANENT)
LIBRARY EXPANSION (COLE)
PINE AVENUE PARK - PHASE I
PINE AVENUE PARK - PINE COMMUNITY BUILDING - PHASE II
PARK SITE ACQUISITION ( 15 ACRES) NE QUADRANT PARK
AVIARA COMMUNITY PARK (24.25 ACRES) *
AVIARA COMMUNITY PARK COMMUNITY BUILDING
POINSETTIA COMMUNITY PARK - PHASE II
ALGA NORTE PARK - PHASE I (30 ACRES)
ALGA NORTE PARK - PHASE 11 (POOL)
LEO CARRILLO PARK - PHASE III
CARR1LLO BARN RESTORATION
TRAP SIG - CAMINO DE LOS COCHES AND LA COSTA AVENUE
TRAP SIG - CAMiNO VIDA ROBLE AND YARROW DRIVE
TRAP SJG - CANNON ROAD AND AVENIDA ENCINAS
TRAP SIG - CANNON ROAD AND COLLEGE BOULEVARD
TRAP SIG - COLLEGE BOULEVARD AND CARLSBAD VILLAGE DR - Reimb
TRAP SIG - EL CAMINO REAL AND POINSETTIA LANE
TRAP SIG - MELROSE DRIVE AND LA COSTA AVENUE
TRAP SIG - PALOMAR AIRPORT ROAD AND MELROSE DRIVE
TRAP SIG - POINSETTIA LANE AND EL FUERTE STREET (REIMB)
TRAF SIG - RANCHO SANTA FE ROAD AND CALLE JUNIPERO
TRAF SIG - TAMARACK AVENUE AND GARFIELD STREET
CARLSBAD BOULEVARD MED IAN -TAMARACK AVENUE TO PINE AVENUE
EL CAMINO REAL MEDIANS
EL CAMINO REAL MEDIANS - LA COSTA
LOAN REPAYMENT - TRAFFIC SIGNALS ANO MEDIANS
LOAN REPAYMENT - ALGA NORTE POOL
LOAN REPAYMENT - POINSETTIA TENNIS COURTS
LOAN REPAYMENT - FIRE STATION #3 LAND ACQUISITION
TOTAL PROJECT EXPENDITURES
ENDING FUND BALANCE
PRIOR
YEARS
N/A
N/A
-
-
7,082,000
-
4,550,000
10,700,000
1,000,000
12,561,308
6,708,000
-
33,000
-
150,000
204,250
-
250,000
210,000
-
-
-
909,500
90,500
-
-
-
44,448,558
N/A
YEAR1
2006-2007
6,817,576
2,891,237
7,100,000
744,000
10,735,237
1,000,000
89,200
3,351,262
5,391,695
9,832,157
7,720,657
YEAR 2
2007-2008
7,720,657
5,017,742
238,745
5,256,487
-
12,977,143
YEAR 3 YEAR 4
2008-2009 2009-2010
12,977,143 16,555,290
3,799,855 2,334,155
238,292 387,000
4,038,147 2,721,155
460,000 5,040,000
563,794
460,000 5,603,794
16,555,290 13,672,651
YEARS
2010-2011
13,672,651
1,154,202
-
1,154,202
100,000
6,796,416
882,824
7,779,240
7,047,613
BUILDOLJT
2011 + +
7,047,613
18,952,316
4,900,000
-
23,852,316
9,832,400
7,117,834
12,143,457
1,987,400
190,000
190,000
210,000
210,000
190,000
210,000
210,000
2,041,080
1,401,600
-
4,900,000
2,500,000
3,600,000
1,000,000
47,933,771
(17,033,842)
(1) Equal ID projected tund balance less any conliruing appropriations C-39
CAPITAL IMPROVEMENT PROGRAM FUND SUMMARY
REDEVELOPMENT - VILLAGE
BEGINNING FUND BALANCE (1)
REVENUES
TAX INCREMENT AND LOANS
TOTAL REVENUES
CAPITAL PROJECTS
VILLAGE PUBUC PARKING ENHANCEMENT PROGRAM
SENIOR Cm EXPANSION - 1ST FLOOR
STREET5CAPE IMPROVEMENTS
CARLSBAD BLVD. AT STATE ST - INTERSECTION ENHANCEMENT DESIGN
TOTAL PROJECT EXPENDITURES
ENDING FUND BALANCE
PRIOR
YEARS
N/A
N/A
615,000
100,000
715,000
N/A
YEAR 1
2006-2007
100,000
100,000
467,044
100,000
567,044
(467,044)
YEAR 2
2007-2008
(467,044)
300,000
300,000
300,000
300,000
(467,044)
YEAR 3
2008-2009
(467,044)
(467,044)
YEAR 4
2009-2010
(467,044)
(467,044)
YEARS
2010-2011
(467,044)
(467,044)
BUILDOUT
2011++
(467,044)
850,000
850,000
850,000
850,000
(467,044)
REDEVELOPMENT - SCCRDA
BEGINNING FUND BALANCE (1)
REVENUES
TAX INCREMENT AND LOANS
TOTAL REVENUES
CAPITAL PROJECTS
CARLSBAD BLVD. AT BREAKWATER ROAD - LEFT TURN LANE
CARLSBAD BOULEVARD ENCINAS CREEK BRIDGE REPLACEMEPJT
TOTAL PROJECT EXPENDITURES
ENDING FUND BALANCE
PRIOR
YEARS
N/A
N/A
243,150
41,453
284,603
N/A
YEAR1
2006-2007
YEAR 2
2007-2008
YEAR 3
2008-2M9
YEAR 4
2009-2010
YEARS
2010-2011
BUILDOUT
2011++
SEWER BENEFIT AREA FEES (SBA)
BEGINNING FUND BALANCE (1)
REVENUES
DEVELOPER FEES
TOTAL REVENUES
CAPITAL PROJECTS
CARLSBAD TRUNK SEWER REACHES VCT1A, VCT1B, VCT1C (SBA "A")
SBA A TO SEWER REPLACEMENT FOR CARLSBAD TRUNK SEWER
SBA C,D,E,F TO SEW REPL FOR S AGUA HEDIONDA INTERCEPTOR
SOUTH AGUA HEDIONDA LIFT STATION AND FORCE MAIN
TOTAL PROJECT EXPENDITURES
ENDING FUND BALANCE
PRIOR
YEARS
N/A
N/A
8,827,415
8,827,415
N/A
YEAR 1
2006-2007
3,168,109
161,250
161,250
3,329,359
YEAR 2
2007-2008
3,329,359
119,419
119,419
2,000,000
2,000,000
1,448,778
YEAR 3
2008-2009
1,448,778
762,869
762,869
2,211,647
YEAR 4
2009-2010
2,211,647
501,361
501,361
2,713,008
YEARS
2010-2011
2,713,008
271,206
271,206
100,001
100,001
2,884,213
BUILDOUT
2Q11++
2,884,213
4,941,900
4,941,900
422,166
3,270,000
3,692,166
4,133,947
SEWER CONNECTION FEE FUND
BEGINNING FUND BALANCE (1)
REVENUES
DEVELOPER FEES
OTHER AGENCY CONTRIBUTIONS (VISTA)
TOTAL REVENUES
CAPITAL PROJECTS
PHASE IV EXPANSION - DEBT SERVICE
PHASE V EXPANSION
BUENA VISTA LIFT STATION FORCE MAIN
BLJENA VISTA LIFT STATION
SEWER MONITORING PROGRAM
VISTA/CARLSBAD INTERCEPTOR AGUA HEDIONDA LIFT STATION (VC12)
VISTA/CARLSBAD INTERCEPTOR REACH VC11B
VISTA/CARLSBAD INTERCEPTOR REACH VC13 TO VC15
VISTA/CARLSBAD INTERCEPTOR REPLACEMENT REACH 3
TOTAL PROJECT EXPENDITURES
ENDING FUND BALANCE
PRIOR
YEARS
N/A
N/A
8,262,660
632,132
42,000
1,119,360
3,549,000
1,800,000
15,405,152
N/A
YEAR1
2006-2007
16,114,789
443,523
6,352,359
6,795,882
933,944
22,000
955,944
21,954,727
YEAR 2
Z007-2008
21,954,727
946,215
6,931,762
7,877,977
935,507
22,000
105,269
11,715,200
73,220
12,851,196
16,981,508
YEAR 3
2008-2009
16,981,508
766,022
3,031,763
3,797,785
937,169
22,000
7,902,530
523.000
9,384,699
11,394,594
YEAR 4
2009-2010
11,394,594
493,337
1,204,323
1,697,659
933,006
22,000
2,092,000
3,047,006
10,045,247
YEAR 5
2010-2011
10,045,247
334,749
1,204,323
1,539,072
931,418
22,000
953,418
10,630,901
BUILDOUT
Z011++
10,630,901
5,219,770
1,233,613
6,453,383
3,720,548
1,440,133
220,000
5,380,681
11,703,603
(1| Equal to ptoiecled fund balanco less any continuing appropriations.C-40
CAPITAL IMPROVEMENT PROGRAM FUND SUMMARY
SEWER REPLACEMENT FUND
BEGINNING FUND BALANCE (1)
REVENUES
TRANSFER FROM OPERATING FUND
LOAN REPAYMENTS
TOTAL REVENUES
CAPITAL PROJECTS
PUBLIC WORKS CENTER
BUILDING IMPROVEMENTS
CAPITAL ACQUISmONS/REPLACEMENT/REHAB
PUMP STATION INTERFACES
STAFFING/PROF. SERVICES AND MISC.
TECHNOLOGY ENHANCEMENT
AVENIDA ENCINAS GRAVITY SEWER
FARADAY AVENUE - ORION TO MELROSE SEWER
FOREST GRAVITY SEWER
HOME PLANT - PIPEUNE REPLACEMENT
HOME PLANT LIFT STATION REHABILITATION
LA COSTA MEADOWS SEWER EXTENSION
LA GOLONDRIA SEWER EXTENSION
NORTH AGUA HEDIONDA INTERCEPTOR REHAB - EAST SEGMENT
NORTH AGUA HEDIONDA INTERCEPTOR - WEST SEGMENT
NORTH AGUA HEDIONDA TRUNK SEWERJ?EACH NAHT1A
NORTH BATIQUITOS INTERCEPTOR REHABILITATION
NORTH BATIQUrrOS SEWAGE LIFT STATION MODIFICATIONS
POINSETTIA LANE SEWER RELOCATION - Reimb
POINSETTIA SEWAGE LIFT STATION ODOR/NOISE ABATEMENT
SEWER LIFT STATION REPAIRS AND UPGRADES
SEWER LINE REFURBISHMENTS/REPLACEMENT
SEWER MASTER PLAN/CONNECTION FEE UPDATE
VISTA/CARLSBAD INTERCEPTOR REHAB REACHES 1 AND 2
BUENA INTERCEPTOR SEWER IMPROVEMENTS
TERRAMAR LIFT STATION EMERGENCY GENERATOR
PHASE II LOAN TO RECYCLED WATER
SEWER REPL TO SEW BENEF A FOR CARLSBAD TRUNK SEWER
TOTAL PROJECT EXPENDITURES
ENDING FUND BALANCE
PRIOR
YEARS
N/A
N/A
-
4,099,190
1,125,033
-
-
110,200
900,000
440,000
-
210,000
654,000
620,000
4,177,751
1,199,000
647,193
50,000
580,380
930,000
-
830,975
460,000
25,000
5,270,000
22,328,722
N/A
YEAR 1 YEAR 2 YEAR 3
2006-2007 2007-2008 2008-2009
9,192,056 10,606,999 10,091,276
2,460,000 2,521,500 2,584,538
2,000,000
2,460,000 4,521,500 2,584,538
3,601,004
715,057 889,670 500,572
266,963
650,000
76,358
119,474 1,743,682
243,800
400,000 80,000
330,000 330,000 330,000
1,880,000
180,958
1,045,057 5,037,223 6,255,258
10,606,999 10,091,276 6,420,556
YEAR 4 YEAR 5 BUILDOLrT
2009-2010 2010-2011 201 1++
6,420,556 8,098,545 9,883,925
2,649,151 2,715,380 27,153,800
3,270,000
2,649,151 2,715,380 30,423,800
541,162 500,000 6,305,829
-
-
-
-
-
-
-
-
-
-
.
-
-
100,000 100,000 500,000
330,000 330,000 3,394,600
354,200
-
-
-
-
971,162 930,000 10,554,629
8,098,545 9,883,925 29,753,096
TDA - LOCAL TRANSPORTATION FUNDS
BEGINNING FUND BALANCE (1)
TDA GRANT
TOTAL REVENUES
CAPITAL PROJECTS
PEDESTRIAN MASTER PLAN
TOTAL PROJECT EXPENDITURES
ENDING FUND BALANCE
PRIOR
YEARS
N/A
N/A
100,000
100,000
N/A
YEAR 1 YEAR 2 YEAR 3 YEAR 4 YEAR 5 BUILDOLfT
2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 2011++
(1) Equal 10 projected lund balance less any continuing appropriations.C-41
CAPITAL IMPROVEMENT PROGRAM FUND SUMMARY
TRAFFIC IMPACT FEES (TIF)
BEGINNING FUND BALANCE (!)
REVENUES
DEVELOPER FEES
MISC. REIMBURSEMENTS
TOTAL REVENUES
CAPITAL PROJECTS
SIDEWALK/STREET CONSTRUCTION PROGRAM
TRAP SIG - FARADAY AVENUE AND ORION STREET
AVENIDA ENCINAS WIDENING - SOUTH OF PALOMAR AIRPORT ROAD
CARLSBAD BOULEVARD WIDENING - CANNON TO MANZANO
CARLSBAD VILLAGE DRIVE WIDENING
EL CAMINO REAL AND CARLSBAD VILLAGE DRIVE
EL CAMINO REAL AND FARADAY AVENUE
EL CAMINO REAL AT AVIARA PARKWAY/ALGA ROAD
EL CAMINO REAL WIDENING - LA COSTA AVENUE TO ARENAL ROAD
EL CAMINO REAL WIDENING - TAMARACK AVENUE TO CHESTNUT AVE.
EL CAMINO REAL WIDENING - S CHESTNUT/S ALGA
MELROSE DRIVE AND ALGA ROAD
PALOMAR AIRPORT ROAD AND COLLEGE BOULEVARD
PALOMAR AIRPORT ROAD WIDENING AT PASEO DEL NORTE
POINSETTIA LANE WIDENING (PASEO DEL NORTE TO BATTQUITOS LN)
TRAFFIC MONITORING PROGRAM
VALLEY AND MAGNOLIA SIDEWALKS
TOTAL PROJECT EXPENDITURES
ENDING FUND BALANCE
PRIOR
YEARS
N/A
N/A
885,672
289,550
-
-
-
-
1,235,941
-
-
1,382,708
522,115
-
-
525,000
-
230,611
5,071,597
N/A
YEAR 1 YEAR 2 YEAR 3 YEAR 4 YEAR 5 BUILDOUT
2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 2011-*-+
7,367,119 8,006,257 9,124,492 9,966,807 10,377,043 10,598,842
1,009,139 1,488,235 1,212,315 780,236 591,799 8,151,897
357,000
1,009,139 1,488,235 1,212,315 780,236 591,799 8,508,897
300,000 210,000 75,000 300,000 300,000 1,200,000
-
983,000
2,363,960
1,488,458
334,720
-
294,972
531,368
-
-
566,932
167,360
-
2,210,198
70,000 70,000 70,000 70,000 70,000 700,000
90,000 225,000
370,000 370,000 370,000 370,000 370,000 10,840,968
8,006,257 9,124,492 9,966,807 10,377,043 10,598,842 8,266,771
TRANSNET/BICYCLE
BEGINNING FUND BALANCE (1)
REVENUES
TRANSNET REVENUE
TOTAL REVENUES
CjPTTAL PROJECTS
BICYCLE MASTER PLAN
COASTAL RAIL TRAIL
TOTAL PROJECT EXPENDITURES
ENDING FUND BALANCE
PRIOR
YEARS
N/A
N/A
150,000
221,801
371,801
N/A
YEAR 1 YEAR 2 YEAR 3 YEAR 4 YEAR 5 BUILDOUT
2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 2011++
12,898 12,898 12,898 12,898 12,898 12,898
-
12,898 12,898 12,898 12,898 12,898 12,898
TRANSNET/ HIGHWAY
BEGINNING FUND BALANCE (1)
TRANSNET REVENUE
TOTAL REVENUES
CAPITAL PROJECTS
CANNON ROAD REACH 4B
TOTAL PROJECT EXPENDITURES
ENDING FUND BALANCE
PRIOR
YEARS
N/A
N/A
1,722,303
1,722,303
N/A
YEAR 1 YEAR 2 YEAR 3 YEAR 4 YEAR 5 BUILDOUT
2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 2011++
206,699 206,699 206,699 206,699 206,699 206,699
206,699 206,699 206,699 206,699 206,699 206,699
(1 ] Equal lo projected fund balance less any continuing appropriations C-42
CAPITAL IMPROVEMENT PROGRAM FUND SUMMARY
TRANSNET-LOCAL
BEGINNING FUND BALANCE (1)
REVENUES
TRANSPORTATION TAXES
TOTAL REVENUES
CAPITAL PROJECTS
TRAP SIG - EL CAM. REAL/PLAZA/MARRON/HOSP WY
CARLSBAD BOULEVARD ENCINAS CREEK BRIDGE REPLACEMENT
CARLSBAD BOULEVARD RETROFIT OVER SDNR
PRIOR
YEARS
N/A
N/A
1,311,000
1,519,000
EL CAMINO REAL WIDENING - USA STREET TO CRESTVIEW DR (LOAN)
EL CAMINO REAL WIDENING - NORTH OF COUGAR DRIVE (LOAN)
EL CAMINO REAL WIDENING - TAMARACK AVENUE TO CHESTNUT
PAVEMENT MANAGEMENT PROGRAM
PAVEMENT MANAGEMENT PROGRAM (NON-JURIS FEES)
VALLEY AND MAGNOLIA SIDEWALKS
TOTAL PROJECT EXPENDITURES
ENDING FUND BALANCE
493,000
17,519,348
600,000
21,442,348
N/A
YEAR1
2006-2007
910,271
6,734,568
6,734,568
38,568
3,300,000
2,500,000
800,000
6,638,568
1,006,271
YEAR 2
2007-2008
1,006,271
3,647,610
3,647,610
215,980
959,000
2,500,000
800,000
4,474,980
178,901
YEAR 3
2008-2009
178,901
3,579,909
3,579,909
2,600,000
800,000
315,000
3,715,000
43,810
YEAR 4 YEAR 5 BUILDOUT
2009-2010 2010-2011 2011++
43,810 31,666 43,158
3,587,856 3,611,492 36,000,000
3,587,856 3,611,492 36,000,000
-
-
-
-
2,648,000 2,813,000 28,130,000
952,000 787,000 7,870,000
3,600,000 3,600,000 36,000,000
31,666 43,158 43,158
TRANSNET - SURFACE TRANSPORTATION
BEGINNING FUND BALANCE (1)
REVENUES
STP REVENUE
TOTAL REVENUES
CAPITAL PROJECTS
TOTAL PROJECT EXPENDITURES
ENDING FUND BALANCE
PROGRAM (STP)
PRIOR
YEARS
N/A
N/A
N/A
YEAR1
2006-2007
80,968
-
YEAR 2
2007-2008
80,968
-
YEAR 3
2008-2009
80,968
-
YEAR 4 YEAR 5 BU1LDOUT
2009-2010 2010-2011 2011++
80,968 80,968 80,968
-
80,968 80,968 80,968 80,968 80,968 80,968
(1 ] Equal lo the projected lund balance less any continuing appropriations.C-43
CAPITAL IMPROVEMENT PROGRAM FUND SUMMARY
WATER - MAJOR FACILITY FEE FUND
BEGINNING FUND BALANCE (1)
REVENUES
DEVELOPER FEES
TOTAL REVENUES
CAPITAL PROJECTS
"D" RESERVOIR - PHASE II
CALAVERA HILLS WATER BOOSTER STATION STANDBY GENERATOR
CANNON ROAD EAST OF EL CAM1NO REAL - Reimb
COLLEGE BOULEVARD - CANNON RD TO CARLSBAD VILLAGE DR - Reimb
COLLEGE BOULEVARD - CANNON TO BADGER LANE
COLLEGE BOULEVARD (ECRTO CANNON ROAD) - Reimb
EL CAMINO REAL BETWEEN COLLEGE AND JACKSPAR
EL CAMINO REAL CROSSING AT KELLY DRIVE
EL CAMINO REAL TRANSMISSION MAIN - LISA STREET TO KELLY DRIVE
EL FUERTE - NORTH OF LOKER - Reimb
EL FUERTE - ALGA ROAD TO POINSETTIA LANE - Reimb
EL FUERTE • POINSETTIA LANE TO PALOMAR AIRPORT ROAD - Reimb
FARADAY AVENUE - ORION TO MELROSE WATERUNE - ReimO
FARADAY AVENUE EXTENSION - Reimb
MAERKLE PUMP STATION IMPROVEMENTS
MAERKLE RESERVOIR STORAGE (TAP #2)
MARRON ROAD - PRESSURE REGULATING STATION TO OCEANSIDE
MASTER PLAN UPDATE
MELROSE DRIVE - PALOMAR AIRPORT ROAD TO FARADAY - Reimb
PAR/ECR PUMP STATION
POINSETTIA LANE - EL CAMINO REAL TO SKIMMER CT (Reimb)
POINSETTIA LANE - SKIMMER CT TO CASSIA
POINSETTIA LANE EAST OF BLACK RAIL ROAD 12"
PRESSURE REDUCING STATION - SYCAMORE CREEK
PRESSURE REGULATING STATION - CANNON AND COLLEGE - Reimb
RANCHO CARRILLO OVERSIZING/ EXTENSION
WATER CONNECTION TO WATER REPLACEMENT
TOTAL PROJECT EXPENDITURES
ENDING FUND BALANCE
PRIOR
YEARS
N/A
N/A
-
-
760,800
700,000
-
-
691,600
104,000
470,000
148,750
2,000,000
1,141,000
97,210
-
-
-
-
-
-
997,350
-
-
-
-
250,000
93,700
-
7,454,410
N/A
YEAR 1 YEAR 2 YEAR 3 YEAR 4 YEAR 5 BUILDOUT
2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 20 11++
12,837,040 13,628,527 15,710,867 15,353,947 1,942,857 2,617,084
845,911 2,082,340 1,728,889 1,036,890 674,227 10,660,310
845,911 2,082,340 1,728,889 1,036,890 674,227 10,660,310
5,978,099
52,300 416,517
-
746,949
487,436
-
-
-
-
-
749,773
54,425 692,675
13,284,514
715,464
47,800
796,300
235,141
357,732
2M.953
117,257
-
54,425 - 2,085,809 14,447,980 - 8,359,121
13,628,527 15,710,867 15,353,947 1,942,857 2,617,084 4,918,273
WATER - RECYCLED WATER FUND
BEGINNING FUND BALANCE (1)
REVENUES
LOANS & GRANTS
CONNECTION FEES
TOTAL REVENUES
CAPITAL PROJECTS
RECYCLED WATER PH II - FACILITY
RECYCLED WATER PH II - FLOW EQUALIZATION
RECYCLED WATER PH II - MAHR RESERVOIR IMPROV.
RECYCLED WATER PH U - PIPELINES
RECYCLED WATER PH II - PUMP STATIONS
RECYCLED WATER TO WATER REPLACEMENT
TOTAL PROJECT EXPENDITURES
ENDING FUND BALANCE
PRIOR
YEARS
N/A
N/A
12,130,019
4,128,280
2,957,000
21,852,521
4,918,574
45,986,394
N/A
YEAR 1 YEAR 2 YEAR 3 YEAR 4 YEAR 5 BUILDOUT
2006-2007 2007-2008 200B-2009 2009-2010 2010-2011 2011++
14,500,000 - - .
14,500,000
14,500,000 - - ...
(1) Equal to the projected kind balance less any continuing appropnations.C-44
CAPITAL IMPROVEMENT PROGRAM FUND SUMMARY
WATER REPLACEMENT FUND
BEGINNING FUND BALANCE (1)
REVENUES
TRANSFER FROM OPERATING FUND
LOAN REPAYMENTS
TOTAL REVENUES
CAPITAL PROJECTS
ECR/TAMARACK PUMP STATION REMOVAL
I-S RECYCLED WATER TRANSMISSION LINE
PUMP STATION REMOVAL
PUBLIC WORKS CENTER
"D" RESERVOIR - PHASE II
"D" RESERVOIR - BLACKRAJL ROAD IMPROVEMENTS
"D" RESERVOIR IMPROVEMENTS
AVIARA PARKWAY AT PLUM TREE
CARLSBAD BOULEVARD - SOUTH OF AVENIDA ENCINAS
COLLEGE BOULEVARD- MAERKLE RESERVOIR TO AGUA HEDIONDA CREEK
CRESTVIEW DRIVE TRANSMISSION MAIN
DEMOLITION OF WATER FACILITIES AT PAJAMA DRIVE
DESALINATION GROUND WATER/SEA WATER STUDY
EL CAMINO REAL - PALOMAR AIRPORT ROAD SOUTH
EL CAMINO REAL TRANSMISSION MAIN FROM FARADAY TO COUGAR DRIVE
EL CAMINO REAL/CARLSBAD VILL DR PIPELINE REPL.
EL FUERTE AND CORINTIA STREET
FOUSSAT ROAD WELL ABANDONMENT
LAKE CALAVERA RESERVOIR IMPROVEMENTS
MAERKLE PUMP STATION IMPROVEMENTS
MISCELLANEOUS PIPELINE REPLACEMENT PROJECTS
MISCELLANEOUS STORAGE TANK REPAIRS
MISCELLANEOUS WATER RESERVOIR FENCING
OCEANSIDE INTERTIE UPGRADE
PAR/ECR PUMP STATION
POINSETTIA LANE - SKIMMER CT TO CASSIA
POINSETTIA LANE EAST OF BLACK RAIL ROAD 12"
RANCHO SANTA FE RD PIPELINE REPLACEMENT
SAN MARCOS BOULEVARD WEST OF SDCWA
TANGLEWOOD PRESSURE REDUCING STATION REPLACEMENT
TAP RESERVOIR EXTERIOR PAINTING
WATER OPERATIONS WATER PUMP PROJECT
WATER SYSTEM INTERTIE CONNECTION
CHESTNUT AVENUE RECYCLED WATER LINE
PASEO DEL NORTE RECYCLED PIPELINE REPLACEMENT
WATER REPLACEMENT TO WATER CONNECTION
PHASE II LOAN TO RECYCLED WATER
TOTAL PROJECT EXPENDITURES
ENDING FUND BALANCE
PRIOR
YEARS
N/A
N/A
-
133,305
442,700
-
-
367,000
156,000
-
-
495,000
-
60,000
-
3,225,000
774,100
65,000
-
202,500
3,217,600
1,000,000
161,000
120,399
-
990,350
-
-
773,000
3,091,241
332,000
132,700
439,000
-
727,200
-
14,500.000
31,405,095
N/A
YEAR 1 YEAR 2 YEAR 3
2006-3007 2007-2008 2008-2009
9,595,101 26,951,399 28,381,326
2,910,723 3,210,660 3,557,165
14,500,000
17,410,723 3,210,660 3,557,165
80,019
6,686,407
376,560 2,886,960
549,673
54,425
418,400 428,651
110,700
436,100
54,425 1,780,733 10,192,737
26,951,399 28,381,326 21,745,754
YEAR 4 YEAR 5 BUILDOUT
2009-2010 2010-2011 2011++
21,745,754 23,832,455 27,397,998
3,620,136 3,684,682 40,772,609
-
3,620,136 3,684,682 40,772,609
-
-
-
-
1,992,629
-
-
459,612
886,171
-
31,380 119,139
-
719,260
-
-
-
156,272
-
-
692,675
-
-
-
-
-
456,161
214,848
-
-
-
-
-
-
1,533,435 119,139 4,075,573
23,832,455 27,397,998 64,095,034
(11 Equal lo Ihe projected lund Oalance less any continuing appropriations C-45
GLOSSARY OF CAPITAL PROJECT FUNDING SOURCES
Assessments Districts (ASMT DIST) - Capital projects financed by the issuance of Assessment
District bonds. Projects include street construction and improvements to Alga Road, College
Boulevard, and the proposed Poinsettia Lane East district.
Bridge and Thoroughfare Districts - Bridge and Thoroughfare District No. 3 developer fees to
partially fund Cannon Road improvements. Bridge and Thoroughfare District No. 2 developer
fees to partially fund the Poinsettia Lane and Aviara Parkway street construction project.
CFD #1 - The City of Carlsbad Community Facilities District No. 1 (Mello-Roos) funds civic
projects, I-5 interchanges, and road segments.
CFD #3 - The newly established City of Carlsbad Community Facilities District No. 3 will fund
improvements within the Faraday/Melrose area.
Federal Grants (FED GRNT) - Projects funded from Federal Grants include the Coastal Rail
Trail and the Carlsbad Boulevard Encinas Creek Bridge Replacement.
Gas Tax - Gas Tax funding for street projects are received under the Streets & Highways Code
of the State of California.
General Capital Const. (GCC) - General Capital Construction funds, created through fund
transfers from the City's General Fund, are used to fund various municipal and other capital
projects.
Golf Course - The Golf Course Enterprise fund is used to pay for construction of the City's
Municipal Golf Course.
Infrastructure Replacement Fund - Annual transfers from the General fund pay for major
maintenance and replacement of the City's infrastructure.
Other - Sources include revenues related to pending financing districts such as College-Cannon
and Faraday-Melrose, or contributions from other agencies.
Park in Lieu (PIL) - Park in Lieu Fees are charged to developers for park acquisition and
development. PIL fees are segregated by quadrant to fund park projects: PIL Area 1 NW, PIL
Area 2 NE, PIL Area 3 SW, and PIL Area 4 SE.
Planned Local Drainage (PLD) - Drainage facilities necessitated by growth are paid from
developer Planned Local Drainage Fees.
Public Facilities Fees (PFF) - Public Facilities Fees are charged to developers to fund civic
facilities, park development, streets, traffic signals, and other facilities.
Sewer Benefit Area Fees (SEW BENEF) - Development fees collected for the construction and
improvement of interceptor systems located within specific Benefit Areas.
Sewer Connection (SEWER CONN) - Development fees include Sewer Connection charges for
expansion of sewer lines and facilities.
C-46
Sewer Replacement (SEWER REPU - Sewer Replacement is part of sewer user fees and pays
for repair and replacement of the City's existing sewer system.
State Grants (ST GRANT) - State Grants include funding for the Coastal Rail Trail and Traffic
Congestion Relief Funds.
Tax Increment Bond (REDVL VILLAGE) - Property taxes generated by increases in assessed
values in the Redevelopment project area. Funds are used to repay Tax Increment Bonds and
finance land acquisition and project construction in the downtown Village district.
Tax Increment (REDVL SCCRDA) - Property taxes generated by increases in assessed values
in the South Carlsbad Coastal Redevelopment project area. Funds are used to pay for project
construction and land acquisition in the south Carlsbad district.
TDA - City street and bicycle projects receive funding from Transportation Development Act
sales tax receipts.
Traffic Impact Fees (TIF) - Developer Traffic Impact Fees are used for various street
construction and improvement projects.
TransNet fTRNSNT/BIKE. /HWY. /LOCAL. /STP) - Receipts of County Sales Taxes allocated by
the San Diego Regional Transportation Commission finance various bicycle, freeway
interchange, and local road improvement projects.
Water Connection (WATER CONN) - Development fees include Major Facility Fees used to fund
expansion of water lines and various water projects.
Water Replacement (WATER REPP - Water Replacement funds are included in water utility
rates and pay for the repair and replacement of existing water lines and facilities.
Water Recycled fRECL WATER) - Revenues used to fund Recycled Water projects, including
Federal and State grants and loans for construction of the Phase II facility, pipelines, flow
equalization, and reservoir improvements.
Zone 5. 13. 16 Park Fee (ZONE 5) - Fees paid by development in Local Facilities Management
Zones 5, 13, and 16 to fund the proposed Business Park Recreational Facility in the City's
industrial corridor.
C-47
5610
i 8 I
Appendices
OrgKev
CITY OF CARLSBAD
PLANNED MAJOR CAPFTAL OUTLAY ITEMS 2006-2007
Horn Descrtogon Qtv Co«tiMEfroruiL, FUW
0011012 COMMUNICATIONS
POLICE
0012124 Canine
001 2 120 Field Operations
0012130 Investigations
FIRE
0012220 Emergency Operations
LIBRARY
0014050 Media
0014060 FTograma/Exhfertton
001 4070 Library Administration
0015020 PARKS
0015060 FACILITIES
0015710 ENGINEERING
0016355 STREET MAINTENANCE
0016370 TRAFFIC SIGNAL MAINTENANCE
ITOTAL GENERAL FUND
i&THEHFUMoa VK'T":- .: v. v,1:1""1";.:"?-1"1. '"T
1 903401 SECTION 8 RENTAL ASSISTANCE
5215710 STORM WATER PROTECTION
6215061 VEHICLE REPLACEMENT
6401710 INFORMATION TECHNOLOGY
ITOTAL OTHER FUNDS
I GRAND TOTAL
Intel core muKlDrocesaor tower
Subtotal Communtoatlofw
Fully trained potce canine
Marked police vehicle with tight bar, radio, in-car computer, GPS, modem.
Unmarked police sedan with radio
Subtotal Polk*
MICU f 3rd Ambulanca/w eautoement )
Subtotal Fir*
The Inscriber INCA CG upgrade
RISO RP3700 Printer Suplfcator
Xerox Work Centre Pro 232
Subtotal Library
200" Aluminum handral between fields 1 & 2 at Pohisetfia Park
Sidewalk around tot lot, additional concrete pads for tables & benches Cat
Picnic table & bench replacement throughout City parks
Compact Truck
Subtotal Parks
Outdoor lighting & bollards for Senior Center
Fire alarm systems for Catavera, Stagecoach, Cole and City Hall
HVAC for Senior Center and City Hall
Computer Room AC and UPS for Faraday and Dove
Hybrid sedan PW Inspector & Streets department
Subtotal Facilities
Mlra Monte Emergency Access Gate
Subtotal Engineering
Seawall repairs Carlsbad Boulevard
Subtotal Street Maintenance
Traffic Signal battery back-up systems
Type III meter service at Cinema & Marron
Underground conduit repair & equipment replacement Chestnut & El Cami
Underground conduit repair & eoubment replacement Carlsbad B. & Tami
Subtotal Traffic Signal Maintenance
iMfrfnWV^";:!"!;!^.^^ •' V '• • •
Section * Rental Assistance Software
Subtotal Street Light Maintenance Fund
1 Ford Ranger Pick-up with Extended Cab
Subtotal Storm water Protection
Sedan, Potee
Sedan, Int Police
Small Hybrid SUV
Van, Mini
Mcycle. Full Size BMW
Pickup 1/2 T
Pickup 3/4 T
Truck 3/4 Utility
Truck , Aerial Large
MICU
Tractor, Large
Mower, Special
Mower, Riding Large
Mower. RkHnq Large
Subtotal vehicle Replacement
Voicemafl Server Replacement
Replacement of Faraday and Blade servers (1 year ahead of schedule)
Replacement of Network Printers
KVM Replacement
Monitors
NEC MA4000 web based, centralized voice server management system
Computers (desktop & laptop)
Public Zen Application Server at Cole
Firewall for lab - Cisco FIX 515
HP Laser Jet Printers
Dove Library public server
Help Desk Remote Access Terminal Server
Scanner (larqe and small sized DMS scanners)
Subtotal Information Technology
1
1
11
1
1
1
1
1
26
1
32
1
2
1
1
1
1
151
1
1
6
3
1
1
3
4
1
1
11
1
1
21
27
1
2
3
1
80
1
240
1
1
S3
1
1
8
1
13.622
13,622
10,000
25.000
23.500
58,500
250.000
260,000
24,400
23,945
18.000
66,345
22,500
25,000
32,500
23.705
103,705
24,000
110,000
160,000
170,000
23.705
487,705
68.000
68,000
60.000
60,000
120,000
35,000
60,000
95.000
310,000
$1,417,877 1
,., " • ;• 1
40.000
40,000
21.550
21,550
$210,000
$54,000
$28,000
$21,000
$60.000
$80,000
$26,000
$32.000
$120,000
$155,000
$28,000
$21,000
$50,000
$55.000
940,000
150,000
40,945
34,480
31,400
25,860
17,000
303,630
8,820
3,555
78,442
8,620
8,620
65.728
776,900
$1.778,460 1
$3,196,327 |
Major Capital Outlay only Includes items over 510,000
D-1
CTTY OF CARLSBAD
OUT-OF-8TATE TRAVEL BUDGET 2006-07
ORGKEY DEPARTMENT TRAVEL DESCRIPTION
*OF
PEOPLE DESTINATION
0647
ADOPTED
BUDGET
iGH£N6tt£&$UM0
0010110
0010310
0011010
0010210
0011012
0011110
0011112
0011210
0011310
0011510
0011610
0012110
0012120-26
CITY COUNCIL
CITY TREASURER
CITY MANAGER
CITY CLERK
COMMUNICATIONS
ADMINISTRATIVE SERVICES
STRATEGIC CHANGE TEAM
CITY ATTORNEY
FINANCE
HUMAN RESOURCES
RECORDS MANAGEMENT
POLICE ADMINISTRATION
POLICE FIELD OPERATIONS
Innovation Groups
LegMattn Meetings
American Shorn and Beach Preservation Ass. (ASBPA)
AssVi of Pubic Treasures US and Canada Annual Confer.
Innovation Groups
ICMA Best Practices
Innovation Groups Board Meetings
Legislative Meetings
National League of CMea
Innovation Groups (workshops) Budgeting for Outcomes
ICMA Annual Conference
MMC - National Conference
3CMA
NATOA
Point of Lights Foundation
National Broadcasters Association
ICMA Conference 9/9-1 3/06
Innovation Groups - Forum Meeting (quarterly)
Innovation Groups -Transforming Local Government Conference
Washington, DC - Legislative trip
Innovation Groups
IMLA Annual Conference
IMLA Mid-Year Conference
Nafl CoBsge of DA'S Government Cnrit Practice
GFOA Winter Meeting
Software Users Conf (2)
Harris Users Ccnf(1)
Outcome Budgeting Goal(2)
Uikage
Inscapa (Disc Instrument certification)
WRIPAC (Personnel Assessment Professional Org)
ASTD (American Society for Tralnfrig & Development)
SHRM (Society for Human Resource Management)
Innovations Group (Western Region)
IPMA (Western Region)
HR.com
ARMA Inf 1 (Assodattton of Record Managers&Administrators)
AIIM
MER (Managing Elector*: Records)
National Notary Association (NNA)
International Association of Chiefs of Polce (IACP)
FBI National Academy
Inn Association for Identification Forensic Conference
5
2
1
1
3
3
2
5
2
4
2
1
1
2
1
1
1
1
1
1
1
3
1
1
1
3
3
1
1
2
1
1
1
1
1
1
Washington, DC
Washington, DC
Long Branch, NJ
Memphis, TN
Washington
Out of State
Out of State
Washington DC
W»- kin n»i M • rv*•wungion uu
Out of State
Pennsylvania
New Orleans, LA
Out of State
Florida
Out of State
Nevada
San Antonio. TX
Western US
Midwest or Western US
Washington, DC
Midwest or Western US
Portland, OR
Washington, DC
Las Vegas, NV
Washington, DC
Out of State
Out of State
Out of State
Out of State
Out of State
Out of State
Out of State
Out of State
Out of State
Out of State
Out of State
San Antonio, TX
Philadelphia. PA
Chicago, IL
Out of State
Boston
Quanta), VA
Boston
8,000
2,000
1,500
9,500
2,202
3,000
3£00
2,000
4,000
2,000
2JSOQ
2,500
3.500
3,500
3,000
2£00
2,000
750
B\250
2,000
1,800
1,500
1200
8,500
1,500
1,500
1,800
1,900
1,600
5^00
1.100
2,100
950
3,050
7,200
5,700
2,000
500
2,300
3,000
1.000
1,000
1,000
5,000
2£00
3,000
2,700
1&200
1,800
1,800
975
1,400
2475 m
m
D-2
CITY OF CARLSBAD
OUT-OF-STATE TRAVEL BUDGET 2006-07
ORGKEY DEPARTMENT TRAVEL DESCRIPTION
fOF
PEOPLE DESTINATION
06-07 1
ADOPTED
BUDGErl
[GtMfcRALFUW
0012130
0012131
0012136
0012140
0012148
0012225
0012220
0013010
0013210
0013310
0013510
0014040
0014050
0014070
0014510
0014520
0014544
0015710
0016010
POLICE INVESTIGATIONS
POLICE VICE/NARCOTICS
POLICE VIOLENT CRIME
POLICE SUPPORT OPERATIONS
DISASTER PREPAREDNESS
FIRE PREVENTION
RRE - EMERGENCY OPERATIONS
COMMUNITY DEVELOPMENT
PLANNING
GEOGRAPHIC INFO. SYSTEMS
ECONOMIC DEVELOPMENT
LIBRARY/TECHNICAL SERVICES
LIBRARY MEDIA SERVICES
DOVE LIBRARY ADMIN
PARK PLANNING & MANAGEMENT
RECREATION-AQUATICS
LEO CARRILLO RANCH
ENGINEERING
PUBLIC WORKS ADMIN.
WlrwM MMvtowTnMng
Witness Interview TnMns
CiMomta Homfckto irmattBatora Association Conference
International Tlxron CAD Users Conference
Background Investlgatbns
Law Enforcenwnt Information Managers Conference
Intl Association of Emergency Managers Annual Conference
Matt Emergency Manager* Auodatfon Conference
National ftn Protection Ass(NFPA) Annual Conference
UUFal Meeting
Making Cities UvaMe Conference
NCI Charrette Planner Certification
AP A Conference
Urban & Regional Inform. System Association Annual Confer.
UUFal Meeting
SiraiDynbt Users Conference
Ubrary Programming AwarrJs-NATOA Conference
2006 EMS Users' Conference
Sirsi Superconference (Devln)
American Lftray Association
ASIS&T Annual Meeting (Devh)
American LJbray Association
American Society of Landscape Architects Conference
National Recreation and Parks Association Aquatics
National Trust Historic Preservation Conference
AWWA National Conference
APWA Congress 2006
Underground Construction Technology Conference
Permits Plus Annual Conference
APWA Conference
Unknown
Unknown
2
3
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
2
3
1
1
1
1
1
1
Out of State
Out of State
Reno.NV
Milwaukee Wl
Out of State
Out of State
Orlando
Out of State
Out of State
Denver. Colorado
Out of State
Portland, OR
Out of State
Vancouver
Denver, CO
Colorado
Buena Vtota, Florida
Denver, Cotorada
Colorado Springs
Washington DC
Austin, TX
Washington DC
Minneapolis
Atlanta, Georgia
Pittsburgh, PA
Ontario, Canada
Kansas City, MO
Aflenta.CA
Out of State
Kansas City , MO
TOTAL GENERAL FUND
1,000
1.000
400
400
1,600
1,800
4,200
1,000
1,800
7,000
1,500
1,200
2.700
1,000
1,000
1,700
1,745
3,445
1,700
1,700
3,400
1,700
1,700
1,700
1,700
1,900
1,900
2,100
1,973
4,073
1,600
2,100
1,410
2,350
7,480
3800
3,600
4,125
4,125
2,000
2,000
3,000
1,900
1,900
1,200
8,000
2,500
2,500
$155,130
D-3
CITY OF CARLSBAD
OUT-OF-STATE TRAVEL BUDGET 200647
ORGKEY DEPARTMENT
[omen £UMJU
1212110 POLICE • ASSET FORFEITURE
5016310 WATER OPERATIONS
5116310 SANITATION OPERATIONS
5206375 SOLID WASTE
5215710 STORM WATER
6401710 INFORMATION TECHNOLOGY
TOTAL OTHER FUNDS
GRAND TOTAL OUT OF STATE TRAVEL
TRAVEL DESCRIPTION
Colorado River Water User Association
Harris UMay Btt« Conlerence
CA-NV-AWWA Annual Spring Conference
AWW A Annual National Conference
Western Regional Backftow Conference
HarieenWafcOrdHSomiaveCortoence
American Beckfkw Prevention Association
Hams UMty BMng Conference
Tri-State Water/Sewer Conference
NRC Conference/HHW Conference
Harris User Conference
HP Insight Manager- Server Management Tool
Novel Bralnshare
Novel Network* Identify Mgr Traingiig
Identity Manager 3
CMS Technical Training
IT Management Conference
Business Objects Enterprise (Crystal) Trainging
*OF
PEOPLE
1
1
2
1
1
2
*i
1
1
1
2
2
1
1
1
2
1
1
2
2
DESTINATION
Us Vegas, NV
Out of State
Out of State
Out of Stale
L« Vegas, NV
Ant NVriDiW, l^v
Out of State
Reno.NV
Out of State
Stateine.NV
Aflania
Denver
South Eastern US
Chicago, IL
Salt Lake City, UT
Western U.S.
Western U.S.
Western U.S.
Western U.S.
Eastern U.S.
06-07
ADOPTED
L BUDGET
1.000
2.300
2.BOO
2,200
1,500
2.700
14,000
1.600
3,000
2,300
1.100
MOO
2,500
3.600
3,600
2.100
2,600
600
6,000
3,496
2,500
4,000
6,000
27.495
S53JK
$208.125
Mt
D-4
MISCELLANEOUS STATISTICAL INFORMATION 2006-07
Date of Incorporation July 16,1952
Type of City General Law
Form of Government Council/Manager
Area 42.19sq. miles
Population (CA Dept of Finance Report 1/1/05) 98,607
Net Assessed Valuation 17,707,928,440
Streets:
Number of Street Lights 6,786
Miles of Streets 338
Fire Protection:
Number of Stations 6
Number of Firefighters & Officers 87
Police Protection:
Number of Stations 1
Number of Sworn Police Officers 112
Water System:
Number of Customers 83,800
Number of Water Connections 27,000
Average Daily Consumption (in Millions of Gallons) 17.6
Miles of Lines and Mains 488
Sewer System:
Number of Customers 64,095
Number of Sewer Connections 18,900
Average Daily Flows (in Millions of Gallons) 6.62
Miles of Sewers 282
Recreation and Culture:
Number of Parks 39
Acres of Parks (Including Open Space) 920
Number of Pools 1
Number of Libraries 2
Number of Materials in Library Collections 380,000+
Total Number of Authorized Full-Time City Employees 682
Source: City of Carlsbad, Finance Department
D-5
ACCOUNTING SYSTEMS AND BUDGETARY CONTROL
The City's accounting system is designed around a few basic principles.
1. The City is not one single entity. It is the total of many entities, each with its separate
function and legal restrictions on the use of resources. In the private sector, a corporation
may have many "subsidiaries" which make up the parent corporation; in the public sector,
a city government may have a variety of "funds" that provide the basis for separately
recording the financial data related to a specific entity. A fund is an accounting entity with
a complete set of self-balancing accounting records. Each fund has been established
because of some restriction on the use of resources received by that fund. This report
includes the transactions of alt entities over which the City Council of the City of Carlsbad
have authority (as defined by the Governmental Accounting Standards Board).
2. The City's accounting system operates on a modified accrual basis for all governmental
type funds. Governmental funds include the General, Special Revenue, Debt Service,
and Capital Projects funds. A modified accrual system is one where (a) revenues are
recognized when they are both measurable and collectable within the accounting period,
or soon enough after the end of the period to pay liabilities of the period; and
(b) expenditures, other than principal and interest on long-term debt, are recorded when
liabilities are incurred.
3. The proprietary fund types (the Enterprise funds and the Internal Service funds) use the
accrual method of accounting. Revenues are recognized in the period earned and
expenses are recognized in the period incurred.
4. Internal controls exist with the accounting system to ensure safety of assets from
misappropriation, unauthorized use or disposition, and to maintain the accuracy of
financial record keeping. These internal controls must be established consistent with the
sound management practices based on the cost/benefit of the controls imposed. The cost
of a control should not be excessive in relation to its benefit as viewed by City
management. The internal controls in existence within the City's system are sufficient to
ensure, in all material aspects, both the safety of the City'5 assets and the accuracy of the
financial record keeping system.
5. Budgetary control is maintained through monthly reports on all revenue and expenditure
accounts as well as special reports summarizing the financial position of the City. The
City Council has authority to control the budget through adoption of a formal budget at the
beginning of each year and by amending the budget as necessary throughout the year.
Expenditures should not exceed budgeted figures. All appropriations expire at year-end
unless specifically carried into the new fiscal year by Council actions. The Carlsbad
Municipal Code requires that the Financial Management Director prepare annually the
budget for the City Manager showing estimated revenues and expenditures.
6. Controls on the use and transfers of budget funds are outlined in the adopted budget
resolution in the appendix of this document.
D-6
1
2
3
4
5
6
7
8
9
10
1
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
RESOLUTION NO. 2006-169
A RESOLUTION OF THE CITY COUNCIL OF THE CITY
OF CARLSBAD, CALIFORNIA, ADOPTING THE FINAL
OPERATING BUDGET AND CAPITAL IMPROVEMENT
PROGRAM FOR THE FISCAL YEAR 2006-07 FOR THE
CITY OF CARLSBAD AND ESTABLISHING CONTROLS
ON CHANGES IN APPROPRIATIONS FOR THE VARIOUS
FUNDS.
WHEREAS, the City Council of the City of Carlsbad, California has reviewed the
proposed final Operating Budget and Capital Improvement Program for fiscal year
2006-07 and has held such public hearings as are necessary prior to adoption of the
final budgets.
WHEREAS, the Planning Commission made a finding of General Plan
Consistency for all projects receiving an allocation of funds for fiscal year 2006-07 on
April 19, 2006 pursuant to Planning Commission Resolution No. 6064.
NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of
Carlsbad, California, as follows:
1. That the above recitations are true and correct.
2. That certain documents now on file in the office of the City Clerk of the
City of Carlsbad entitled, "City of Carlsbad, 2006-07 Preliminary Operating Budget and
2006-07 to Buildout Capital Improvement Program - Preliminary" as amended in
accordance with Exhibits 3-A through 3-C attached hereto and incorporated by
reference herein, is hereby adopted as the Operating and Capital Improvement Budgets
for the City of Carlsbad for the fiscal year.
3. That the amounts reflected as estimated revenues for fiscal year 2006-07
D-7
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
as shown in Exhibits 3-A and 3-B are hereby adopted as the budgeted revenues for
2006-07.
4. That the amounts designated as the 2006-07 Budget request in Exhibits 3-
A and 3-B are hereby appropriated to the department or fund for which they are
designated, and such appropriation shall not be increased except as provided herein.
5. That total appropriations for each fund may only be increased or
decreased by the City Council by passage of a resolution amending the budget except
as provided herein.
6. That the following controls are hereby placed on the use and transfers of
budget funds:
A. No expenditure of funds shall be authorized unless sufficient funds
have been appropriated by the City Council or City Manager as described below.
i. The City Manager may authorize all transfers of funds from
account to account within any department.
ii. The City Manager may authorize transfers of funds between
departments within the same fund in an amount up to $100,000 per transfer.
iii. The City Manager may delegate any of the authority given to him
under this resolution.
iv. The City Manager may authorize budget adjustments involving
offsetting revenues and expenditures; the City Manager may authorize increases
in an appropriation for a specific purpose where the appropriation is offset by
unbudgeted revenue, which is designated for said specific purpose.
v. The City Manager may authorize the transfer of appropriations
between accounts and/or capital projects up to $1,000,000 for the costs
associated with the Encina Wastewater Facility (Encina) as authorized by the
Encina Wastewater Authority's staff and/or Board. Any increase to the total
D-8
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
appropriations for Encina's operating budget and capital program must be
approved by the City Council.
vi. The City Manager may authorize budget adjustments to increase
the appropriations for Workers Compensation and Liability funds operating
budget in an amount equal to the increases in costs of claims expenses.
vii. The City Council must authorize all transfers of funds from the
Council's Contingency Account.
B. The City Manager may authorize emergency out of state travel for
public safety or emergency services purposes.
C. The City Council must authorize any increase in the number of
authorized permanent personnel positions above the level identified in
Exhibit 3-C.
D. The City Manager may authorize the hiring of temporary or part time
staff as necessary, within the limits imposed by the controls listed above.
7. That the legal level of budgetary control is the fund level. Budgets may
not legally be exceeded at the fund level without appropriate authorization by the City
Council.
8. That interest earned on grants may be appropriated during the year for the
purpose for which the grant was received.
9. That the Finance Director is authorized to transfer funds remaining in the
Traffic Congestion Relief Fund on June 30, 2007, to the Pavement Overlay Fund to be
used towards the Pavement Overlay program.
10. That all appropriations in the Operating Budget and in Capital
Improvement Program remaining unexpended at June 30, 2006, are hereby
appropriated to the 2006-07 fiscal year.
11. That all appropriations for outstanding encumbrances as of June 30,
2006, are hereby continued into 2006-07 for such contracts or obligations.
D-9
\
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
PASSED, APPROVED AND ADOPTED at a Regular Meeting of the City Council
of the City of Carlsbad on the 20th day of June 2006, by the following vote:
AYES: Council Members Lewis, Hall, Kulchin, Packard, Sigafoose
NOES: None
ABSENT: None
LEWIS, Mayor
ATTEST:
. W$OD, City Clerk
D-10
Ml
Mt
m
m
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
RESOLUTION NO. 2006-170
A RESOLUTION OF THE CITY COUNCIL OF THE
CITY OF CARLSBAD, CALIFORNIA, ESTABLISHING
THE 2006-07 APPROPRIATION LIMIT AS REQUIRED
BY ARTICLE XIIIB OF THE CALIFORNIA STATE
CONSTITUTION AND STATE LAW
WHEREAS, Article XIIIB of the California State Constitution requires that
governments annually establish a limit on the appropriation of proceeds of taxes; and
WHEREAS, State law requires that this limit be presented to the governing body
of each entity each fiscal year; and
WHEREAS, State law also requires that this limit be published in a newspaper of
general circulation to allow public response to the limit as adopted.
NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of
Carlsbad, California, as follows:
1. That the above recitations are true and correct.
2. That the City Council of the City of Carlsbad, California, does hereby
establish and adopt the 2006-07 appropriation limit of one hundred sixty-six
million, four hundred ninety-nine thousand, three hundred and ninety-one
($166,499,391) as computed in Exhibit 6-A attached hereto.
3. That the City Clerk is directed to publish this Resolution in a
newspaper of general circulation.
D-11
1
2
3
4
5
6
7
8
9
10i\j
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
PASSED, APPROVED AND ADOPTED at a Regular Meeting of the City Council
of the City of Carlsbad on the 20th day of June 2006. by the following vote:
AYES: Council Members Lewis, Hall, Kulchin, Packard, Sigafoose
NOES: None
ABSENT: None
*JI * x sj
I VI ///} / S
Iflff/f //// /%/
/ llrff/fr/I*1^ "rfitfl^7
WM^LE&IS.Ivlayor
ATTEST:
J)
^3$$^^(|^^^^|iWOOD, City Clerk
^ ySSgfe'fe&! &~^~
'*, & ^^^^-^^
'XiJLT^
m
m
m
.
m
Ml
Ml
MJ
Mf
-
Ml
Ml
^Ml
•4
M*
Ml
7
Ml
Ml
m
Ml
•1
Ml
1
f
D-12
CITY OF CARLSBAD
GANN APPROPRIATIONS LIMIT
The Appropriations Limitation imposed by Proposition 4 and modified by Proposition 111
creates a restriction on the amount of revenue which can be appropriated in any fiscal year.
The revenues which are subject to the Limitation are those considered "proceeds of taxes." The
basis for calculating the Limit began in fiscal year 1978-79 and is increased based on population
growth and inflation.
The major change made by Proposition 111 allows the City to annually choose among the
following options for calculating its Gann Limit:
> Population growth of Carlsbad, OR
> Population growth within San Diego County, AND
> Growth in California per capita income, OR
> Growth in non-residential assessed valuation due to new construction in the City.
The factors used to calculate the 2006-07 Limit were:
> Population growth in Carlsbad, AND
> Growth in California per capita income
The formula is outlined below:
2005-06 Expenditure Limit $153,938.047
% Carlsbad Population Growth 1.0404
Growth in California per capita income X 1.0396
Net Increase Factor 1.0816
2006-07 Limit (2005-06 Limit X Factor) $166.499.391
Current Appropriation of Proceeds of Taxes $97,455,248
(Subject to the Limit)
The spending limit for the City of Carlsbad for 2006-07 is $166.5 million, with appropriations of
"proceeds of taxes" of $97.5 million. The result of the calculation provides the City with an
operating margin of $69 million.
D-13
GLOSSARY
Appropriation - A specific amount of money authorized by the City Council for an approved work
program or individual project.
Assessed Valuation - A dollar value placed on real estate or other property by San Diego
County as a basis for levying property taxes.
Balanced Budget - A budget in which planned expenditures do not exceed planned funds
available.
Beginning/Ending Fund Balance - Unencumbered resources available in a fund from the
prior/current year after payment of the prior/current year expenses.
Bond - A certificate of debt issued by an entity, guaranteeing payment of the original investment,
plus interest, by a specified future date.
Budget - An annual financial plan that identifies revenues, types and levels of services to be
provided, and the amount of funds that can be spent. Carlsbad's Operating Budget
encompasses one fiscal year, as does the Capital Improvement Program appropriation.
Capital Improvement Program - A multi-year financial plan containing proposed construction of
physical assets such as park, street, sewerage, and recreation facilities. This program has
identified all projects which are the responsibility of the City between the present to buildout.
Capital Outlay - Equipment (fixed assets) with a value $1,000 or more and an estimated useful
life of more than one year, such as automobiles and office furniture, which appear in the
Operating budget.
Cost Allocation - A method used to charge General fund overhead costs to other funds, such as
Enterprise funds and Internal Service funds.
Debt Service - The payment of principal and interest on borrowed funds such as bonds.
Department - An organizational unit comprised of programs or divisions. Examples include the
Police Department, Library Department, and Human Resources Department.
Encumbrance - A legal obligation to pay funds, an expenditure of which has not yet occurred.
Enterprise Fund - A fund type established to account for the total costs of selected
governmental facilities and services that are operated similar to private enterprises. These
programs are entirely self-supported, and include the Water and Sanitation Departments.
Expenditure - The actual spending of funds set aside by appropriation for identified goods and
services.
Fee - A general term used for any charge levied by government for providing a service or
permitting an activity.
Fiscal Year - A twelve-month period of time designated as the budget year. Carlsbad's fiscal
year is from July 1 to June 30.
D-14
Fund - A set of interrelated accounts to record revenues and expenditures associated with a
— specific purpose.
"" Fund Balance - The amount of financial resources available for use.
General Fund - The primary fund used by the City for which revenues and expenditures are not
"• legally restricted for use. Examples of departments operating within the General fund include
Fire, Library, and the City Manager's Office.
m Grant - Contributions of cash or other assets from another governmental agency to be used or
expended for a specified purpose, activity, or facility.
tm
m Growth Management Plan - A comprehensive approach to land-use planning ensuring
controlled and managed growth within the City, while providing designated public facilities.
M»
— Growth Management Standards - Standards for acceptable service levels that have been
established for eleven public facility categories.
«•
Interfund Transfers - Payments from one fund to another fund, primarily for work or services
provided.
«•
Internal Service Fund - A fund that provides services to all City departments, and bills the
— various other funds for services rendered. Examples of Internal Service funds include Fleet
Maintenance, Information Systems, and Workers' Compensation Insurance.
^B
"• Maintenance and Operation - A general category used for classifying expenditures for materials,
supplies, and services that are normally used within the fiscal year.
w
• Operating Budget - The annual appropriation of funds for ongoing program costs, which include
salaries, benefits, maintenance, operation, and capital outlay items.«•»
^ Operating Costs - Estimated expenses that can be expected to occur following the construction
of a Capital Improvement Project.
— Personnel - Costs associated with providing the staff necessary to provide the desired levels of
services. Included are both salary and benefit costs.
<m
Revenues - Amount of funds received from the collection of taxes, fees, permits, licenses,
m interest, and grants during the fiscal year.
Special Revenue Funds - A fund that collects revenues that are restricted by the City, State, or
«• federal government as the method by which they may be spent.
D-15
INDEX
About the City of Carlsbad, iii
Accounting Systems and Budgetary Control, D-6
Administrative Services Summary, B-38
Adult Learning Program, B-105
Arts Off ice, B-107
Arts Special Events, B-110
Asset Forfeiture - Various, B-68
Budget Awards, A-24
Budget Highlights, A-3
Budget Process, A-4
Budget Summary, A-20
Buena Vista Channel Maintenance, B-149
Building Inspection, B-85
Calendar, A-23
Canine, B-58
Capital Improvement Program Overview, C-1
Capital Improvement Projects 2006-07, C-16
Capital Outlay Items, D-1
Capital Projects, C-3
Capital Projects through Buildout, C-5
Carlsbad City Library, B-98
Cash Management, B-32
Centra de Informacidn, B-101
Cole Library, B-97
CIP Budget Expenditure Schedule, C-15
CIP Fund Summary, C-32
CIP Projected Fund Balances, C-12,13
CIP Revenue Estimates, C-14
CIP Summary, C-10
City Attorney, B-37
City Clerk, B-31
City Council, B-29
City Manager, B-34
City Manager's Transmittal Letter, A-1
Collection Development & Acquisitions, B-103
Communication, B-36
Communications Center, B-66
Community Development Administration, B-78
Community Development Block Grant, B-89
Community Development Summary, B-77
Community - Oriented Policing, B-69
Community Services - Police, B-56
Community Services Summary, B-95
Council's Five-Year Vision Statement, ii
Cultural Arts Summary, B-106
Debt Management Issues, A-17
Disaster Preparedness, B-67
Dove Library, see Carlsbad City Library
Economic Development, B-84
Economic Profile, A-5
Emergency Operations, B-74
Engineering, B-128
Environmental Programs, B-156
Expenditure Schedule, B-24
Facilities Maintenance, B-136
Family Services, B-63
Field Evidence, B-59
Field Operations, B-55
Finance, B-40
Fire Administration, B-73
Fire Department Summary, B-71
Fire Prevention, B-75
Fund Balances, B-15.C-12
Future Growth & Development, C-7
Gann Appropriations Limit, D-13
Genealogy/Local History, B-100
General Fund, A-10, B-1
General Services Summary, B-131
Geographic Information System, B-82
Glossary - Capital Projects, C-46
Glossary, D-14
Golf Course, B-144
Growth Projections, C-7
Growth Management Plan, C-11
H
Highlights, A-3
Housing, B-87
Housing and Redevelopment Summary, B-86
Housing - HUD Section 8, B-88
Housing Trust Fund Administration, B-87
Human Resources, B-42
m
m
m
INDEX
Information Technology, B-48
Investigations, B-59
Land Use Planning, B-80
Library Summary, B-97
Lighting & Landscape District No. 2, B-140
Low/Moderate Income Housing - Village, B-92
Low/Moderate Income Housing - S. Carlsbad, B-94
M
Maintenance & Operations Summary, B-150
Media Services, B-104
Median Maintenance, B-139
Miscellaneous Non-Departmental, B-50
Operating Budget Overview, B-1
Operating Expenditures, B-24
Organization Chart, iv
Other Funds, B-5
Recreation Summary, B-111
Redevelopment Operations - Village Area, B-90
Redevelopment Operations - S. Carlsbad Area, B-93
Resolutions, D-7
Revenues - Capital Projects, C-9
Revenue Estimates, B-17
Revenue Projections - General Fund, A-12, B-18
Revenue Projections • Operating, A-11,8-18
Risk Management, B-46
Sanitation Operations, B-154
School Resource Officers, B-61
Self-Insured Benefits, B-47
Senior Programs, B-123
Sister City, B-109
Solid Waste Management, B-157
Special Events - Cultural Arts, B-110
Staffing, A-21
Statistical Information, D-5
Strategic Goals, A-4
Street Lighting, B-148
Street Maintenance, B-145
Street Tree Maintenance, B-138
Summary, A-19, A-20
Support Operations - Police, B-65
Storm Water Protection, B-158
Park Maintenance, B-133
Park Planning & Recreation Mgt., B-113
Personnel Allocations, A-21
Police Administration, B-54
Police Grants, B-70
Police Summary, B-52
Policy & Leadership Summary, B-28
Project Evaluation, C-2
Property and Evidence, B-62
Public Safety Summary, B-51
Public Works Administration, B-126
Public Works Summary, B-125
Task Force, B-64
Technical Services - Library, B-102
Traffic Signals, B-147
Trails, B-135
Travel, D-2
Vehicle Maintenance, B-141
Vehicle Replacement, B-143
Vice/Narcotics, B-60
w
Readers Guide to the Budget, i
Records Management, B-44
Recreation - Agua Hedionda Lagoon, B-120
Recreation - Aquatics, B-117
Recreation Fee Supported, B-115
Recreation Operations, B-121
Wastewater Operations, see Sanitation Operations
Water Operations, B-152
Weed Abatement, B-76
Worker's Compensation, B-45
Youth/School Programs, B-61