INTRODUCTION
The purpose of this Technical Appendix is to provide a brief description of the
project scope, location and need for those projects approved in the City of
Carlsbad 2006-07 Capital Improvement Program (CIP) Budget. Also included at
the beginning of each project category is a funding matrix which identifies the
proposed funding source(s), funding amounts and timing for each of the
approved CIP projects included with the respective category. All projects with
any current or future funding are listed. Most of the cost estimates included in
this appendix are preliminary as detailed designs have not been completed.
All costs are in current dollars, therefore, projects in future years should be
anticipated to escalate over time to account for inflation.
t i i 1 i I I i 1 1 I I i I I I I 1 I I i 1 i i i i t ! i i I i I i i 1 t I
TABLE OF CONTENTS
CIVIC PROJECTS
Administrative Facility Projects
Funding Matrix for Administrative Facility Projects 1
City Administration Training Facility 2
Civic Center 3
Public Works Center 4
Police and Fire Facility Projects
Funding Matrix for Police and Fire Facility Projects 5
Fire Station No. 3 (Relocation) 6
Fire Station No. 5 Storage Building/Restrooms 7
Fire Station No. 6 (Permanent) 8
Police CAD Implementation 9
Public Safety Training Facility 10
Library Facility Projects
Funding Matrix for Library Facility Projects 11
Cole Library Expansion 12
Carlsbad Library Learning Center 13
Miscellaneous Projects
Funding Matrix for Miscellaneous Projects 14
Bicycle Master Plan 15
Community Facilities District #1 Administration 16
Coastal Rail Trail 17
Opportunistic Sand Program 18
Pedestrian Master Plan 19
Proposition "C" Projects 20
Public Works Inventory and Facilities Management Program 21
Village Public Parking Enhancement Program 22
Village Streetscape Improvements 23
FACILITY MAINTENANCE PROJECTS
Facility Maintenance Projects
Funding Matrix for Facility Maintenance Projects 24
Beach Access Repair/Upgrades 25
Cole Library HVAC Replacement 26
Holiday Park Restroom Improvements 27
Laguna Riviera Park Restroom Replacement 28
Repair/Recoat Guardrail Palomar Airport Bridge at Carlsbad Boulevard 29
Senior Center Courtyard Renovation 30
Stagecoach Park Picnic Shelter 31
Stagecoach Park Synthetic Turf Fields 32
Tot Lot Improvement Projects 33
PARKS PROJECTS
Citvwide Parks Projects
Funding Matrix for Citywide Parks Projects 34
Business Park Recreational Facility 35
Carlsbad Municipal Golf Course 36
Lake Calavera Trails Master Plan 37
Senior Center Expansion 1st Floor 38
Senior Center Expansion 2nd Floor 39
Veteran's Memorial Park 40
Northwest Quadrant Parks Projects
Funding Matrix for Northwest Quadrant Parks Projects 41
Pjne Avenue Park-Phase 1 42
Pine Avenue Park- Phase II (Community Building) 43
Northeast Quadrant Parks Projects
Funding Matrix for Northeast Quadrant Parks Projects 44
Hidden Canyon Park 45
Park Site Acquisition 46
Park Site Development 47
i! ii ii ii ii ii 11 ii ii ii ii ii it PI mm m ,1 • i i i • i
i j I I i i i i I i t i k d t i i ; i i i t ' > >
Southwest Quadrant Parks Projects
Funding Matrix for Southwest Quadrant Parks Projects 48
Aviara Community Park- Phase 1 49
Aviara Community Park- Phase II (Community Building) 50
Aviara Reimbursement Agreement 51
Poinsettia Community Park - Phase II 52
Southeast Quadrant Parks Projects
Funding Matrix for Southeast Parks Projects 53
Alga Norte Park - Phase 1 54
Alga Norte Park Phase II (Aquatics Center) 55
Carrillo Ranch Phase III Barn/Theater 56
Carrillo Ranch Erosion Repair 57
Leo Carrillo Park - Phase III 58
DRAINAGE PROJECTS
Drainage Projects
Funding Matrix for Drainage Projects 59
Agua Hedionda Channel Improvements 60
Aviara Parkway Storm Drain Reimbursement 61
Calle Gavanzo Subsurface Drainage Improvement 62
Carlsbad Boulevard Storm Drain Replacement 63
College Boulevard Bridge Facility • 64
College Boulevard/Cannon Road (Drainage Basin BJB) 65
College Boulevard/Cannon Road (Calavera Creek Channel and Drainage Basin BJ) 66
Cynthia Lane Storm Drain 67
Faraday/Melrose Drainage Facilities 68
Gabbiano Lane Storm Drain Modification Study 69
Highland Drive Between Pine Avenue and Basswood Avenue 70
Kelly Drive Channel Repair 71
La Costa Avenue Storm Drain Replacements 72
Master Drainage Plan Update 73
Miscellaneous Master Drainage Facilities 74
Miscellaneous Road Subdrains 75
Park Drive and Tamarack Avenue Storm Drain • 76
Ridgecrest Drainage Improvement 77
Romeria Street Drainage Improvement 78
Tamarack and El Camino Real Storm Drain and Siltation Basin 79
SEWER PROJECTS
Encina Water Pollution Control Facility Projects
Funding Matrix for Encina Water Pollution Control Facility Projects 80
Building Improvements 81
Capital Acquisitions Replacement/Rehabilitation 82
Phase IV Expansion Debt Service 83
Phase V Expansion 84
Sewer Collection System Projects
Funding Matrix for Sewer Collection System Projects 85
Avenida Encinas Gravity Sewer 86
Buena Interceptor Sewer Improvements 87
Buena Vista Lift Station & Pump Addition 88
Buena Vista Lift Station Force Main (VC-4) 89
Carlsbad Trunk Sewer Reaches VCT1A, VCT1B, VCT1C 90
Forest Gravity Sewer 91
Home Plant Lift Station 92
La Costa Meadows Sewer Extension 93
La Golondrina Sewer Extension 94
North Agua Hedionda Interceptor Rehabilitation - East Segment El Camino Real to Kelly Drive 95
North Agua Hedionda Interceptor Rehabilitation - West Segment Cove Drive to Hoover Street 96
North Agua Hedionda Trunk Sewer Reach NAHT1A 97
North Batiquitos Interceptor Rehabilitation • 98
North Batiquitos Sewage Lift Station Modifications 99
Poinsettia Sewage Lift Station Odor and Noise Abatement 100
Sewer Lift Station Removals 101
Sewer Lift Station - Miscellaneous Repairs & Upgrades 102
Sewer Line Refurbishment / Replacement 103
Master Plan / Connection Fee Update 104
Sewer Monitoring Program 105
South Agua Hedionda Lift Station and Force Main 106
Terramar Lift Station Emergency Generator 107
Vista/Carlsbad Interceptor Agua Hedionda Lift Station (VC 12) 108
Vista/Carlsbad Interceptor Sewer Reach VC11B 109
Vista/Carlsbad Interceptor Sewer Reaches VC13 to VC15 11°
Vista/Carlsbad Interceptor Sewer Rehabilitation Reaches 1 thru 3 111
IV
ii ii ii ii ii ri ii 11 ii § i f i vi ii it ffi mm * i KI ii
iilllliliitiilifiiliiiiiiikiliiiiiiiii
WATER PROJECTS
Water Distribution System Projects
Funding Matrix for Water Distribution System Projects 112
Aviara Parkway 114
Calavera Hills Water Booster Station Standby Generator 115
Cannon Road East of El Camino Real 116
Carlsbad Boulevard South of Avenida Encinas 117
College Boulevard from Cannon Road to Carlsbad Village Drive 118
College Boulevard - Cannon Road to Badger Lane 119
College Boulevard (ECR to Cannon Road) 120
College Boulevard Maerkle Reservoir to Agua Hedionda Creek 121
Crestview Drive Transmission Main 122
"D" Reservoir - Black Rail Road Improvements 123
"D" Reservoir Improvements 124
"D" Reservoir Phase II 125
Demolition of Water Facilities at Pajama Drive 126
Desalination Groundwater/Seawater Study 127
El Camino Real between College & Jackspar 128
El Camino Real Crossing at Kelly Drive 129
El Camino Real (Palomar Airport Road South) 130
El Camino Real Transmission Main - Lisa Street to Kelly Drive 131
El Camino Real Transmission Main from Faraday Avenue to Cougar Drive 132
El Camino Real / Carlsbad Village Drive Water Pipeline Replacement 133
El Fuerte (North of Loker) 134
El Fuerte (Alga Road to Poinsettia Lane) 135
El Fuerte (Poinsettia Lane to Palomar Airport Road) 136
El Fuerte and Corintia Street 137
Ellery Water Pump Project 138
Faraday Avenue Extension 139
Foussat Road Well Abandonment 140
Lake Calavera Reservoir Improvements 141
Maerkle Pump Station 142
Maerkle Reservoir Storage (TAP #2) 143
Marron Road (Pressure Regulating Station to Oceanside) 144
Master Plan Update 145
Water Distribution System Projects (Continued)
Melrose Drive / Palomar Airport Road to Faraday 146
Miscellaneous Pipeline Replacements 147
Miscellaneous Storage Tank Repairs 148
Miscellaneous Water Reservoir Fencing 149
Oceanside Intertie Upgrade 150
Palomar Airport Road/El Camino Real Pump Station 151
Poinsettia Lane (El Camino Real to Skimmer Court) 152
Poinsettia Lane (Skimmer Court to Cassia Road) 153
Poinsettia Lane East of Black Rail Road 154
Pressure Reducing Station - Sycamore Creek 155
Pressure Regulating Station (Cannon Road and College Boulevard) 156
Rancho Carrillo Oversizing / Extension 157
San Marcos Blvd. Pipeline Replacement Palomar Airport Road West of San Diego County Water Authority (SDCWA) 158
Tanglewood Pressure Reducing Station Replacement 159
TAP Reservoir Exterior Painting 160
Water System Intertie Connection 161
Recycled Water Projects
Funding Matrix for Recycled Water Projects 162
Chestnut Avenue Recycled Water Line 163
El Camino Real and Tamarack RW Pump Station 164
I-5 Recycled Water Transmission Line 165
PaseoDel Norte Recycled Pipeline Replacement 166
Pump Station Removal 167
Recycled Water Phase II - Facility 168
Recycled Water Phase II - Flow Equalization 169
Recycled Water Phase II - Mahr Reservoir Improvements 170
Recycled Water Phase II - Pipelines 171
Recycled Water Phase II - Pump Stations 172
VI
II II II II II II II II II II PI II LI II II II fm • 1 II
II II II II II II II II II II II if ; ii II II (I II II
CIRCULATION SYSTEM PROJECTS
Traffic Signal Projects
Funding Matrix for Traffic Signal Projects - Sheet 1 173
Alga Road and Cazadero Drive '. 174
Aviara Parkway (Poinsettia Lane to El Camino Real) 175
Aviara Parkway and Camino De Las Ondas 176
Calle Barcelona and Paseo Avellano 177
Camino De Los Coches and Calle Acervo 178
Camino De Los Coches and La Costa Avenue 179
Camino Vida Roble and Yarrow Drive 180
Cannon Road and Avenida Encinas 181
Cannon Road and College Boulevard 182
Carlsbad Boulevard and Tamarack Avenue Signal Repairs 183
Carlsbad Boulevard and Cherry Avenue 184
Carlsbad Village Drive and Glasgow Drive 185
College Boulevard and Carlsbad Village Drive , 186
El Camino Real / Plaza Drive / Marron Road / Hosp Way 187
El Camino Real and Chestnut Avenue Signal Repairs 188
El Camino Real and Poinsettia Lane 189
El Camino Real and Tamarack Avenue Signal Repairs 190
El Fuerteand Rancho Pancho 191
Faraday Avenue and Camino Hills Drive 192
Faraday Avenue and Orion Street 193
Faraday Avenue and Priestly Drive 194
Faraday Avenue and Rutherford Road 195
La Costa Avenue and Esfera Street 196
La Costa Avenue and Levante Street 197
La Costa Avenue and Nueva Castilla Way 198
Melrose Drive and La Costa Avenue 199
Monroe Street and Hosp Way '. 200
Palomar Airport Road and Melrose Drive 201
Paseo Del Norte and Car Country Drive 202
Poinsettia Lane and Black Rail Road 203
Poinsettia Lane and Brigantine Road 204
Poinsettia Lane and El Fuerte Street 205
VII
Traffic Signal Projects (Continued)
Poinsettia Lane and Snapdragon Drive 206
Rancho Santa Fe Road and Calle Junipero (Formerly Melrose Drive South) 207
Rancho Santa Fe Road and San Elijo Road (Formerly Questhaven Road) 208
Tamarack Avenue and Pontiac Drive 209
Tamarack Avenue and Valley Street 210
Tamarack Avenue and Garfield Street 211
Video Detection Conversion 212
Street Projects
Funding Matrix for Street Projects - Sheet 1 213
Funding Matrix for Street Projects - Sheet 2 214
Avenida Encinas Widening South of Palomar Airport Road 215
B&TD#2 Poinsettia Lane Reach "E" (Cassia Road to Skimmer Court) 216
Bridge and Thoroughfare District No. 2 Poinsettia Lane Reaches A, B, C, F, G & Aviara Parkway Reimbursement 217
B&TD#3 - Cannon Road West Frost Avenue to Faraday Avenue (Reimbursement) 218
Cannon Road Reach 4B - College Boulevard to Oceanside 219
Carlsbad Boulevard at Breakwater Road - Left Turn Lane 220
Carlsbad Boulevard and State Street Pedestrian and Intersection Enhancement Design 221
Carlsbad Boulevard Bridge Over Power Plant Discharge Channel 222
Carlsbad Boulevard Bridge Over Railroad Concrete Barrier 223
Carlsbad Boulevard Encinas Creek Bridge Replacement 224
Carlsbad Boulevard Median Tamarack Avenue to Pine Avenue 225
Carlsbad Boulevard Bridge Retrofit Over San Diego Northern Railroad 226
Carlsbad Boulevard Widening - Cannon Road to Manzano Drive 227
Carlsbad Village Drive and Avenida De Anita 228
Carlsbad Village Drive Widening 229
College Boulevard Reach A and Cannon Road Reach 4A 230
College Boulevard / Cannon Road Reach 3 Assessment District 231
Concrete Replacement 232
El Camino Real and Carlsbad Village Drive 233
El Camino Real and Faraday Avenue 234
El Camino Real at Aviara Parkway/Alga Road 235
El Camino Real Medians 236
El Camino Real Widening La Costa Avenue to Arenal Road 237
El Camino Real Widening - Lisa Street to Crestview Drive 238
El Camino Real Widening - North of Cougar Drive 239
El Camino Real Widening Tamarack Avenue to Chestnut Avenue 240
viii
li II II II II II II II II II II II •• II II II II II II
ftltfilliiiifiiiiiiijiifitiliiliii
Street Projects (Continued)
Faraday Avenue / Melrose Drive Extensions 241
Interstate 5 and La Costa Avenue Auxiliary Lanes 242
Melrose Drive and Alga Road 243
Palomar Airport Road and College Boulevard 244
Palomar Airport Road and Melrose Avenue Right-Turn Lane 245
Palomar Airport Road Widening at Paseo Del Norte 246
Park Drive, Marina Drive to Cove Drive 247
Pavement Management Program 248
Pavement Management Concrete Repairs 249
Poinsettia Lane East of El Camino Real Financing Program 250
Poinsettia Lane Widening (Paseo Del Norte to Batiquitos Lane) 251
Rancho Santa Fe Road and Olivenhain Road Improvements 252
Rancho Santa Fe Road North Phase I 253
Rancho Santa Fe Road North Phase II 254
Rancho Santa Fe Road South (To Encinitas) 255
San Marcos Boulevard Widening Project 256
Sidewalk / Street Construction Program 257
Tamarack Avenue and Adams Street Intersection Improvement 258
Traffic Monitoring Program 259
Underground District No. 17 (Roosevelt Street) 260
Valley Street and Magnolia Avenue Sidewalks 261
IX
fi ii ii ii 11 ii ii ii ri r i ii ii ii ii ii ri ti
CIVIC PROJECTS
i t i i i i i i I i i i i i i 1 i i i i i i j i i i 1 i a i l i i i i I i
ADMINISTRATIVE FACILITY PROJECTS
FUNDING MATRIX FOR ADMINISTRATIVE FACILITIES PROJECTS
PROJ
NO.
4000
3572
3572
3655
FUND
NO.
40001
35721
35722
36551
r*
PROJECT TITLE
CITY ADMIN TRAINING FACILITY (PRE-DESIGN)
CIVIC CENTER ?.
PUBLIC WORKS CENTER
PUBLIC WORKS CENTER
PUBLIC WORKS CENTER
FUNDING
SOURCE
GCC
CFD#1
CFO*1
WATER REPL
SEWER REPL
TOTAL
BUDGET
100,000
25,157,346
16,111,792
6,686,407
3,601,004
FUTURE YEAR BUDGET AMOUNTS
YEAR1
2006-07
YEAR 2
2007-2008
YEAR 3
2008-2009
13,403,526
6,686,407
3,601,004
YEAR 4
2009-2010
25,157,346
YEARS
2010-2011
YEAR 6-10
2011-2016
BUILDOUT
2016-2021
I I I i I I I I I I I 1 I I I I I 1 I 1 I 1 i 1 I 1 I 1 I I I 1
Page 1
11 II II
I I i i i i i j I i I i i f I i i I i I I l i l i i i i
CAPITAL PROJECT DESCRIPTION
ADMINISTRATIVE FACILITIES - CITY ADMINISTRATION TRAINING FACILITY
PROJECT NAME
4000
PROJECT NO.
PROJECT LOCATION MAP:
PROJECT
SITE
PROJECT LOCATION:
At either the Carlsbad Safety Center or the Carlsbad Municipal Water District
building.
PROJECT DESCRIPTION:
Prepare design plans and specifications for a citywide training facility. When
not in use by City personnel, facility would be available for professional
development courses, computer training, and/or provide educational
conference and meeting facility space for public and private sector
organizations and educational institutions.
PROJECT NEED:
Facility would provide facilities and services for employee development
activities sponsored by the City for its employees.
FINANCING:
Purpose
Pre-Design
Total Cost =
Estimated Cost
$100,000
$100,000
Funding Source
GCC
TRAININGFACILITY Page 2
CAPITAL PROJECT DESCRIPTION
ADMINISTRATIVE FACILITIES - CIVIC CENTER
PROJECT NAME
NONE
PROJECT NO.
PROJECT LOCATION MAP:
PROJECT
'SITE
PROJECT LOCATION:
El Camino Real and Faraday Avenue.
PROJECT DESCRIPTION:
Redesign the existing 128,000 square foot "Farmers Building" at the
intersection of El Camino Real and Faraday Avenue as a future City Hall and
Council Chambers complex. Project will consolidate all administrative
operations and facilities in one location for organizational and operational
efficiency. Include 1% for public art.
PROJECT NEED:
Required to meet Growth Management Standards.
FINANCING:
Purpose Estimated Cost
Design/Construction $25,157,346
Total Cost = $25,157,346
Funding Source
CFD#1
CITYHALL Page 3
ii ii t i pa PI f i • i 11 11
11 II 11 i i i I I i i I i i i i i i i i i i t i t i
CAPITAL PROJECT DESCRIPTION
ADMINISTRATIVE FACILITIES - PUBLIC WORKS CENTER
PROJECT NAME
i i i i i 1 it i i
3572 & 3655
PROJECT NO.
PROJECT LOCATION MAP:
PROJECT
•SITE
PROJECT LOCATION:
Phase II of Safety & Service Center, Orion Way.
PROJECT DESCRIPTION:
Construction of the Public Works Center and associated improvements.
The project includes office, shops, yard, warehouse, and parking to
accommodate the Public Works MSA. The warehouse will also provide
forcitywide warehousing and storage. Additionally, the project increases
Safety Center parking and includes funding for public art.
PROJECT NEED:
Required to meet Growth Management Standards.
FINANCING:
Purpose Estimated Cost Funding Source
Design/Construction $16,111,792
Design/Construction $3,601,004
Design/Construction $6,686,407
CFD#1
Sewer Replacement
Water Replacement
Total Cost =$26,399,203
Annual Operating Cost = $159,080
COMMSERV (Public Works Center)Page 4
i i i l i I i i i l i i I I 1 I i i i I I I i j i i i i i I i t i 1 I I i i
POLICE AND FIRE FACILITY PROJECTS
FUNDING MATRIX FOR POLICE AND FIRE FACILITY PROJECTS
PROJ
NO.
3688
3901
3685
3686
FUND
NO.
36881
39011
36851
36861
PROJECT TITLE
FIRE STATION #3 RELOCATION
FIRE STATION #5 STORAGE BUILDING/RESTROOMS
FIRE STATION #6 (PERMANENT)
POLICE CAD IMPLEMENTATION
PUBLIC SAFETY TRAINING FACILITY - PROP C
FUNDING
SOURCE
PFF
GCC
PFF
GCC
GCC
TOTAL
BUDGET
6,600,000
316,600
5,400,000
2,312,228
950,000
FUTURE YEAR BUDGET AMOUNTS
YEAR1
2006-07
1,000,000
YEAR 2
2007-2008
YEAR 3
2008-2009
460,000
YEAR 4
2009-2010
5,040,000
YEARS
2010-2011
100,000
YEAR 6-10
2011-2016
BUILDOUT
2016-2021
II II VI II II II II II II II II II II 11 II II II
Page 5
I I I I
li i i i i iiiliiiiiiliiifiiiiiti!
CAPITAL PROJECT DESCRIPTION
POLICE AND FIRE FACILITIES - FIRE STATION NO. 3 (RELOCATION)
PROJECT NAME
i i 1 i i i i
NONE
PROJECT NO.
PROJECT LOCATION MAP:
PROJECT;SITE
CALAVERA
HILLSCOMMUNITYPARK
PROJECT LOCATION:
Southwest corner of Carlsbad Village Drive and Glasgow Street adjacent to
Calavera Park or along Cannon Road between El Camino Real and College
Boulevard.
PROJECT DESCRIPTION:
This new station will be a 6,200 square foot suburban facility housing one
3-person engine company. If the site is located along Cannon Road, a one (1)
acre site would need to be acquired. Includes 1% cost for public art in
compliance with Ordinance No. 1279.
After relocation, the existing Fire Station No. 3 building and site will be sold.
PROJECT NEED:
Relocation of this fire station is required to ensure a five minute response time
within the northeast quadrant of the City as development occurs.
FINANCING:
Purpose
Environmental
Design
Construction
Admin/Inspection
Property Acquisition (1
FFE
Total Cost =
Estimated Cost Funding Source
$158,000
$468,000
$4,370,000
$500,000
ac.) $1,000,000
$104,000
$6,600,000
PFF
PFF
PFF
PFF
PFF
PFF
FIRESTA3-2
Page 6
CAPITAL PROJECT DESCRIPTION
POLICE AND FIRE FACILITIES - FIRE STATION NO. 5 STORAGE BUILDING/RESTROOMS
PROJECT NAME
3688
PROJECT NO.
PROJECT LOCATION MAP:
SAFETY
CENTER
PROJECT LOCATION:
2540 Orion Way adjacent to the Public Safety Center and Fire Station No. 5.
PROJECT DESCRIPTION:
Construct a 2,469 square foot combined public restrooms/secure storage
facility adjacent to Fire Station No. 5. The structure will be designed and built to
provide for fire equipment storage and roof ventilation training. The structure
will be designed to accommodate a future second floor. The overall design will
incorporate the same building materials as the existing building. The public
restrooms will serve citizens utilizing the new Skateboard Park.
PROJECT NEED:
Current storage has been outgrown and portable, plastic enclosures are being
used to alleviate problem. Project will provide additional enclosed, secure
storage space at Fire Station No. 5. Facility will also include restrooms, vending
machines, drinking fountain and pay phone for citizens using Skateboard Park.
FINANCING:
Purpose
Construction
Total Cost =
Estimated Cost Funding Source
$316,600 GCC
$316,600
FSSstor
I | | I I I I I I 1 I I I 1 I 1 I I • 1
Page 7
i n • t i i i i
iitjiiiiiiiliiiiiiii II i i t I i i li
CAPITAL PROJECT DESCRIPTION
POLICE AND FIRE FACILITIES - FIRE STATION NO. 6 (PERMANENT)
PROJECT NAME
3901
PROJECT NO.
PROJECT LOCATION MAP:
PROJECT
SITE
PROJECT LOCATION:
On the east side of the existing Rancho Santa Fe Road west of proposed
Rancho Santa Fe Road.
PROJECT DESCRIPTION:
This new station will be a 6,200 square foot suburban facility housing one
3-person engine company. This station will require a traffic signal to gain
access onto Rancho Santa Fe Road for response to emergencies. The signal
will only be activated for emergency egress. This station also requires an
access easement across the Habitat Conservation Plan area that requires
approval of the Department of Fish & Game and the U.S. Wildlife Service.
After construction, the existing temporary Station No. 6 will be dismantled and
the land restored for use by the developer. Includes 1% cost for public art in
compliance with Ordinance No. 1279.
PROJECT NEED:
The fire station is required to ensure a five minute response time within the
southeast corner of the City as development occurs.
FINANCING:
Purpose
Environmental
Design
Construction
Acquisition
Admin/Inspection
Total Cost =
Estimated Cost
$152,500
$450,000
$4,387,500
$60,000
$350,000
$5,400,000
Funding Source
PFF
PFF
PFF
PFF
PFF
FIRESTA6
Page 8
CAPITAL PROJECT DESCRIPTION
POLICE AND FIRE FACILITIES - POLICE CAD IMPLEMENTATION
PROJECT NAME
3685
PROJECT NO.
PROJECT LOCATION MAP:
NOT APPLICABLE
PROJECT LOCATION:
Safety Center.
PROJECT DESCRIPTION:
This project will replace an existing 13 year old Computer Aided Dispatch
(CAD) system and implement an 800 MHz radio data communication system.
The replacement of the CAD system is necessary due to the age and
outmoded technology of the existing system and the inability to implement
major portions of the data communications system due to the outmoded
technology of the existing system.
PROJECT NEED:
The primary purpose of the CAD system is to enable the police and fire
departments to provide a timely response to emergency incidents. This
supports Council Goal Strategic Goal of Top Quality Services by being able to
provide timely responses that result in high customer satisfaction and improve
work processes through the use of best technology and information.
The technology of the existing CAD system prevents the police and fire
departments from implementing components of the 800 MHz Data
Communication system such as Automatic Vehicle Locator (AVL), integration
with City mapping system, records retrieval and field reporting.
FINANCING;
Purpose
Installation
Total Cost =
Estimated Cost
$2,312,228
$2,312,228
Funding Source
GCC
CAData
II II II II II I I I I II II i • II II
Page 9
I II II II II II II
il li i i II ii i 1 II i 1 ti 11 1 ! 1 t i i i i tl i i i i i i
CAPITAL PROJECT DESCRIPTION
POLICE AND FIRE FACILITIES - PUBLIC SAFETY TRAINING FACILITY
PROJECT NAME
3686
PROJECT NO.
PROJECT LOCATION MAP:PROJECT LOCATION:
Adjacent to the Carlsbad Safety Center and Fire Station No. 5.
PROJECT DESCRIPTION:
Preparation of site and design plans for a 25-lane shooting range, 4-story fire
training tower, 2-story residential training prop, outdoor seating pavilion,
fire administration office building with classroom, and storage facilities.
PROJECT NEED:
Existing Police Training Range facility within Veterans Memorial Park will be
removed with the construction of the City golf course project.
FINANCING:
Purpose
Design/Studies
Total Cost =
Estimated Cost
$950,000
$950,000
Funding Source
GCC
FIRINGRANGE
Page 10
i i i I 1 i i i t 1 i 1 t I 1 i i i t i i i i i J i i i i i i t 1 i i
LIBRARY FACILITY PROJECTS
FUNDING MATRIX FOR LIBRARY FACILITY PROJECTS
PROJ
NO.
4001
4001
3771
FUND
NO.
40011
40012
37711
PROJECT TITLE
LIBRARY EXPANSION (COLE)
LIBRARY EXPANSION (COLE)
LIBRARY EXPANSION (LEARNING CENTER - ADVANCE)
LIBRARY EXPANSION (LEARNING CENTER - ADVANCE)
LIBRARY EXPANSION (LEARNING CENTER)
FUNDING
SOURCE
CFD*1
PFF
GCC
CFW1
OTHER
TOTAL
BUDGET
4,580,016
9,832,400
600,000
4,491,837
1,048,163
FUTURE YEAR BUDGET AMOUNTS
YEAR1
2006-07
1,550,000
90,000
YEAR 2
2007-2008
YEARS
2008-2009
YEAR 4
2009-2010
YEARS
2010-2011
YEAR 6-10
2011-2016
BUILDOUT
2016-2021
4,580,016
9,832,400
II II II II II II II II II II II PI VI Bill II II
Page 11
B 1 I I
i i i l I l i l i i I l i l i i i i i i i I i I I i I I I I I I 1 i 1
CAPITAL PROJECT DESCRIPTION
LIBRARY FACILITIES - COLE LIBRARY EXPANSION
PROJECT NAME
NONE
PROJECT NO.
PROJECT LOCATION MAP:PROJECT LOCATION:
At the site of the existing Cole Library, 1250 Carlsbad Village Drive, adjacent to
the existing City Hall.
PROJECT DESCRIPTION:
Construction of a new 45,155 square foot library on the present site, east of the
existing library building.
PROJECT NEED:
The Library Master Plan calls for expansion of the Cole Library to meet the
growth management standard at buildout. The 1998 Feasibility Study
recommends replacement of the existing library with a 45,155 square foot new
building. This construction will satisfy the buildout growth management
standard of 100,000+ square feet of library space. Project includes 1% for
public art.
FINANCING:
Purpose
Design/Construction
Design/Construction
Total Cost =
Estimated Cost Funding Source
$9,832,400
$4,580,016
$14,412,416
PFF
CFD#1
EXP_COLE Page 12
CAPITAL PROJECT DESCRIPTION
LIBRARY FACILITIES - CARLSBAD LIBRARY LEARNING CENTER
PROJECT NAME
3771 & 4001
PROJECT NO.
PROJECT LOCATION MAP:
PROJECT
SITE
PROJECT LOCATION:
3368 Eureka Place - adjacent to Holiday Park.
PROJECT DESCRIPTION:
The existing 5,723 square feet of building will be remodeled and a second story
added consisting of 4,988 square feet (total 10,711 square feet). An existing
home (housing Head Start) will be demolished and relocated to a modular
building to be located on the east side of the property. The main building will
allow the Adult Learning and Centro de Informacion to operate in a permanent
location.
PROJECT NEED:
To provide a permanent location for the Adult Learning and Centro de
Informacion programs.
FINANCING:
Purpose
Construction
Construction
Construction
Total Cost =
Estimated Cost Funding Source
$600,000
$4,491,837
$1,048,163
$6,140,000
GCC
CFD#1
Other
LEARNCTR Page 13
f ) 1 1 I 1 I I I 1 I I I 1 I 1 I 1 1 I I 1 • 1 • J I 1 i J 1 1 I 1 VI • 1
i i l 1 i 1 i l i 1 i i i 1 I I i 1 i f i ! i i i i i i i i i i i
MISCELLANEOUS CITYWIDE PROJECTS
FUNDING MATRIX FOR MISCELLANEOUS CITYWIDE PROJECTS
PROJ
NO.
3960
3455
3455
3455
3926
4002
4002
3634
3650
FUND
NO.
39601
34554
34557
34553
39261
40021
40022
36341
36501
PROJECT TITLE
BICYCLE MASTER PLAN
CFD#1 ADMINISTRATION
COASTAL RAIL TRAIL
COASTAL RAIL TRAIL
COASTAL RAIL TRAIL (CMAQ)
OPPORTUNISTIC SAND
PEDESTRIAN MASTER PLAN
PEDESTRIAN MASTER PLAN
PROPOSITION C PROJECTS
PUBLIC WORKS INVENTORY AND FAC MAINT PROGRAM
VILLAGE PUBLIC PARKING ENHANCEMENT PROGRAM
VILLAGE STREETSCAPE IMPROVEMENTS
FUNDING
SOURCE
TRANSNET/BIKE
CFD»1
TRANSNET/BIKE
OTHER
FED GRNT
OTHER
TDA
GCC
6CC
GCC
REDVL VILLAGE
REDVL VILLAGE
TOTAL
BUDGET
150,000
1,100,000
221,801
184,176
4,413,784
57,240
100,000
150,000
22,711,000
404,992
850,000
400,000
FUTURE YEAR BUDGET AMOUNTS
YEAR1
2006-07
110,000
100,000
YEAR 2
2007-2008
110,000
300,000
YEAR 3
2008-2009
110,000
YEAR 4
2009-2010
110,000
YEARS
2010-2011
110,000
YEAR 6-10
2011-2016
440,000
22,71 1 ,000
BUILDOUT
2016-2021
I i II II II II II II II II II II f 1 I 1 I I
Page 14
• 1 11
i i i i II I i i I ii II II i l ii II II tl il II
CAPITAL PROJECT DESCRIPTION
MISCELLANEOUS CITYWIDE PROJECTS - BICYCLE MASTER PLAN
PROJECT NAME
II I i 1 i I i
3960
PROJECT NO.
PROJECT LOCATION MAP:
CITYWIDE
PROJECT LOCATION:
Citywide
PROJECT DESCRIPTION:
To study the City's bicycle needs and to develop a citywide bicycle network
which will tie into regional bicycle paths and also with the City's Trails System.
Construction of certain bicycle routes allows compliance with requirements of
the Federal Clean Air Act. Requires completion of Environmental Impact
Report.
PROJECT NEED:
In order to be eligible for certain funding sources, cities must have an adopted
Bicycle Plan.
FINANCING:
Purpose
Study/Report
Environmental
Total Cost =
Estimated Cost Funding Source
$50,000
$100,000
$150,000
TransNet/Bike
TransNet/Bike
BICYCLE Page 15
CAPITAL PROJECT DESCRIPTION
NONE
MISCELLANEOUS CITYWIDE PROJECTS - COMMUNITY FACILITIES DISTRICT #1 ADMINISTRATION
PROJECT NAME
PROJECT NO.
PROJECT LOCATION MAP:
N/A
PROJECT LOCATION:
N/A
PROJECT DESCRIPTION:
City costs to administer Communities Facilities District No. 1 (CFD #1).
PROJECT NEED:
Administration of Communities Facilities District No. 1 is needed to assure that
the CFD #1 taxes are properly levied and collected in conformance with State
law and to be certain that funding for the CFD #1 projects is available at the
time of need for the various projects.
FINANCING:
Purpose
Administration
Total Cost =
Estimated Cost Funding Source
$1,100,000 CFD#1
$1,100,000
Page 16CFD#1ADM
I I I I 1 1 I 1 I I I ! I 1 I 1 I I I 1 I 1 1 1 I I I 1 I i I I I i I 1 I 1
iiiiliiitiiiilliiiiiiiiiii i t a i i i i i i t i
CAPITAL PROJECT DESCRIPTION
MISCELLANEOUS CITYWIDE PROJECTS - COASTAL RAIL TRAIL
PROJECT NAME
3455
PROJECT NO.
PROJECT LOCATION MAP:
CITI OF OCEMSIDE
PROJECT LOCATION:
Within the San Diego Northern Railroad (SDNRR) right-of-way between the
Oceanside Transit Station and the Encinitas Coaster Station.
PROJECT DESCRIPTION:
Construction of a 16-foot wide paved multi-modal bicycle/pedestrian trail
including graded shoulders, landscaping, signage, safety devices at roadway
crossings, bicycle loop detectors and other ancillary facilities. The Coastal Rail
Trail through Carlsbad will be constructed in phases as funding allows.
PROJECT NEED:
The project accomplishes the Council goal of promoting multi-modal
transportation facilities. The linking of four North County Coaster transit
stations with a pedestrian/bicycle trail will encourage the use of non-motorized
transport through the City, as well as to and from the transit stations.
FINANCING:
Purpose
Design/Construction
Design/Construction
Design/Construction
Estimated Cost
$4,413,784
$221,801
$184,176
Funding Source
TEA
Trans/Bike
APCD
Total Cost =$4,819,761
Rl trail
Page 17
CAPITAL PROJECT DESCRIPTION
MISCELLANEOUS PROJECTS - OPPORTUNISTIC SAND PROGRAM
PROJECT NAME
3926
PROJECT NO.
PROJECT LOCATION MAP:
BEACH
NOURISHMENT
SITE
OpporsndNEW
I 1 I I I I I 1
PROJECT LOCATION:
Along the Carlsbad coastline.
PROJECT DESCRIPTION:
Secure permits from the regulatory and resource agencies to allow the City to
administer a program of using inland sources of beach quality material for an
ongoing local beach nourishment program.
PROJECT NEED:
To allow for an ongoing beach nourishment activity on the Carlsbad coastline.
FINANCING:
Purpose Estimated Cost Funding Source
Study/Permits $57,240 State Grant
Total Cost = $57,240
II II II II II II
Page 18
II II II II II II II II II
II II II i 1 t 1 i i I I i I i I i I i l i I i i
CAPITAL PROJECT DESCRIPTION
1 i i i 1 I 1 i t i i
4002
MISCELLANEOUS CITYWIDE PROJECTS - PEDESTRIAN MASTER PLAN
PROJECT NAME
PROJECT NO.
PROJECT LOCATION MAP:
N/A
RED PLAN
PROJECT LOCATION:
N/A
PROJECT DESCRIPTION:
To study the City's pedestrian needs and develop a citywide pedestrian network
which will tie into the City's trail system. Construction of certain pedestrian
routes allow compliance with requirements of the Federal Clean Air Act.
PROJECT NEED:
A Pedestrian Master Plan is necessary to quality for certain funding sources.
FINANCING:
Funding SourcePurpose
Study/Report
Study/Report
Total Cost =
Estimated Cost
$100,000
$150,000
$250,000
TDA
GCC
Page 19
CAPITAL PROJECT DESCRIPTION
MISCELLANEOUS CITYWIDE PROJECTS - PROPOSITION "C" PROJECTS
NONE
PROJECT NO.
PROJECT NAME
PROJECT LOCATION MAP:
N/A
PROJECT LOCATION:
In miscellaneous locations throughout the City not specifically determined at
this time.
PROJECT DESCRIPTION:
Spending of funds from various sources including the General Fund in an
amount over $1 million to construct recreational facilities including a swimming
pool complex, trails linkages and open space, a city safety training facility and a
portion of Cannon Road east of College Boulevard (known as Reach 4).
PROJECT NEED:
Projects are needed for various reasons including compliance with growth
management standards, compliance with General Plan Goals and Objectives
and other community needs. The expenditure of funds for these projects from
various sources including the General Fund were approved by a vote of the
qualified voters of Carlsbad in a general election.
FINANCING:
Projects
Original Set Aside
Aquatic Complex
City/Safety Training Facility
Cannon Road - Reach 4
Trails/Open Space
Remaining Allocation
Allocation
$35,000,000
$11,239,000
$1 ,050,200
$0
$0
$22,711,000
* Other funding sources may be substituted in lieu of GCC Funds as
such fund sources become available.
Page 20PROP C Projects
II II II II II II II II II II II II II II II II II § 1 II
ii ii ii if 11 ii ll if fi 12 II t i i t il i i if i i
CAPITAL PROJECT DESCRIPTION
MISCELLANEOUS CITYWIDE PROJECTS - PUBLIC WORKS INVENTORY AND
FACILITIES MANAGEMENT PROGRAM
PROJECT NAME
3634
PROJECT NO.
PROJECT LOCATION MAP:
NOT APPLICABLE
PROJECT LOCATION: N/A
PROJECT DESCRIPTION:
This project will create a comprehensive computer based geographical information
system (GIS) for all capital improvements maintained within the Public Works
Major Service Area. In addition to establishing a computer inventory of all Public
Works facilities, the program will establish service standards, track maintenance
histories, identify hazard areas, project future replacement and maintenance needs
and project future staffing levels needed to maintain the existing and projected
Public Works inventory.
PROJECT NEED:
This project is needed to modernize the Public Works functions of the City.
Presently, the inventory control and maintenance programming functions of the
Public Works Service Area are disjointed, minimal or non-existent. This results in
lowered maintenance and staffing efficiency. Completion of the program will result
in better utilization of staff resources, improved maintenance of Public Works
facilities, improved budgeting for maintenance services and capital projects and
decreased facility life cycle costs.
FINANCING:
Purpose
Data Acquisition/Programs
Total Cost =
Estimated Cost
$404,992
$404,992
Funding Source
GCC
Page 21
PWINVENT
CAPITAL PROJECT DESCRIPTION
3650
MiSCELLANEOUS CITY WIDE PROJECTS - VILLAGE PUBLIC PARKING ENHANCEMENT PROGRAM
PROJECT NAME
PROJECT NO.
PROJECT LOCATION MAP:
VILLGPKG
II II II II II II II
PROJECT LOCATION:
Within boundaries of Village Redevelopment Area.
PROJECT DESCRIPTION:
Implementation of recommendations within Village Parking Program, which
include acquisition of land for future public parking, a study of impediments to
full utilization of existing public parking lots, and improvements to existing
public parking lots (as needed) to encourage full utilization of existing public
parking lots.
PROJECT NEED:
Parking in the Village Redevelopment Area has been an issue for several
years. A Village Parking Program is currently being prepared to address
various parking issues within the Village. This program will identify
recommended actions to pursue to address the underutilization of existing
public parking lots and to plan for future parking needs. The proposed projects
are consistent with the needs to address parking in the Village.
FINANCING:
Purpose
Land Acquisition
Total Cost =
Estimated Cost
$850,000
$850,000
Funding Source
Village Redevelopment
Page 22
il II II II II II II II
II II II ilililfiiiiltiiiii
CAPITAL PROJECT DESCRIPTION
i i I i I i i
NONE
MISCELLANEOUS CITYWIDE PROJECTS - VILLAGE STREETSCAPE IMPROVEMENTS
PROJECT NAME
PROJECT NO.
PROJECT LOCATION MAP:PROJECT LOCATION:
Various locations in Village Redevelopment Area.
PROJECT DESCRIPTION:
Develop a plan to facilitate streetscape and landscaping improvements at
various locations within the Village Redevelopment Area. This project may
include a diagonal or other parking study to determine the appropriateness of
adding on-street parking. An implementation project would be added at a later
date to the CIP budget.
PROJECT NEED:
The Council has indicated an interest in pursuing enhancements and
revitalizing the Village Area. The program is intended to address this need and
is included within the Village Redevelopment Implementation Plan for 2005 to
2009.
FINANCING:
Purpose
Study
Design
Total Cost =
Estimated Cost Funding Source
$100,000
$300,000
$400,000
Village Redevelopment
Village Redevelopment
VILLAGE Page 23
I 1 f 1 I 1 I 1 I 1 I 1 I 1 I I I 1 I 1 I 1 I• 1 I 1 f 1 I 1 I 1 I 1 f 1 I 1
FACILITY MAINTENANCE PROJECTS
i I I 1 i l i i t I i I t 1 i i i 1 i i i ! i i i i i i t i i i i i i I i i
FACILITY MAINTENANCE PROJECTS
FUNDING MATRIX FOR FACILITIES MAINTENANCE PROJECTS
PROJ
NO.
3896
3942
3897
3943
4700
3861
3936
3937
3944
FUND
NO.
38961
39421
38971
39431
47001 J
38611
39361
39371
39441
PROJECT TITLE
BEACH ACCESS STAIRS REPLACEMENT
COLE LIBRARY HVAC REPLACEMENT
HOLIDAY PARK - RESTROOM IMPROVEMENTS
LAGUNA RIVIERA PARK RESTROOM REPLACEMENT
REPAIR RECOATING GUARDRAIL PAR BRIDGE AT CARLSBAD BLVD
SENIOR CENTER COURTYARD LANDSCAPING
STAGECOACH PARK PICNIC SHELTER
STAGECOACH PARK SYNTHETIC TURF
TOT LOT IMPROVEMENTS
FUNDING
SOURCE
IRF
IRF
IRF
IRF
GCC
GCC
GCC
GCC
IRF
TOTAL
BUDGET
517,500
1,319,790
530,808
260,000
130,000
30,000
100,000
1,718,000
327,260
FUTURE YEAR BUDGET AMOUNTS
YEAR1
2006-07
YEAR 2
2007-2008
YEARS
2008-2009
YEAR 4
2009-2010
YEARS
2010-2011
YEAR 6-10
2011-2016
BUILDOUT
2016-2021
II II II II 11 II II II II II II II II II II II II
Page 24
• III
II i I i 1 1 I i t i 1 1 I I t i i I I i a i 1 I I I i i I
CAPITAL PROJECT DESCRIPTION
FACILITIES MAINTENANCE - BEACH ACCESS REPAIR/UPGRADES
PROJECT NAME
3896
PROJECT NO.
PROJECT LOCATION MAP:
PROJECT
SITE
PROJECT LOCATION:
Beach accesses at Christiansen Way, Beech Street, Carlsbad Village Drive,
Grand Avenue, Rue Des Chateaux, Tamarack Avenue, Cherry Avenue,
Maple Avenue, and Sycamore Avenue.
PROJECT DESCRIPTION:
Provide major repairs to beach accesses, replace existing deteriorated beach
access steps, railing, and foundations. Upgrade base (re-engineer) to
withstand high surf conditions, use heavy aluminum for handrails to replace
existing eroded galvanized metal.
PROJECT NEED:
Major repairs are required to keep the beach accesses in a long-term safe
condition. These improvements will dramatically reduce the amount of labor
and materials currently being expended on painting and maintenance of steps
and handrails.
FINANCING:
Purpose
Design
Construction
Admin/Inspection
Total Cost =
Estimated Cost
$37,000
$474,500
$6,000
$517,500
Funding Source
IRF
IRF
IRF
BEACHACC2
Page 25
CAPITAL PROJECT DESCRIPTION
FACILITIES MAINTENANCE - COLE LIBRARY HVAC REPLACEMENT
PROJECT NAME
3942
PROJECT NO.
PROJECT LOCATION MAP:PROJECT LOCATION:
Cole Library-1250 Carlsbad Village Drive.
PROJECT DESCRIPTION:
Complete refurbishing or replacement of the current HVAC system with
modern, energy efficient HVAC systems to improve reliability, efficiency,
and reduce repair and maintenance costs.
PROJECT NEED:
The HVAC system is in need of major refurbishment or complete replacement
in order to provide environmental control of the Cole Library. Major components
of the system are in poor condition due primarily to age. At this time, it is not
cost-effective to continue the intensive maintenance that is required to keep the
system operational. There is a potential for a major component failure due to
the age of the system that would render the entire system non-operational.
FINANCING:
Purpose
Design/Studies
Construction
Total Cost =
Estimated Cost
$40,000
$1,279,790
$1,319,790
Funding Source
IRF
IRF
Cole lib Page 26
I 1 I I V • 1 1 1 1 I 1 I 1 I 1 I I i 1 1111 i I I I • I I I I I I III
II II I I ililiiiiiiiiiiiitlti
CAPITAL PROJECT DESCRIPTION
FACILITIES MAINTENANCE - HOLIDAY PARK RESTROOM IMPROVEMENTS
PROJECT NAME
i I II II
3897
PROJECT NO.
PROJECT LOCATION MAP:
BASSWOOD AVE.
PROJECT LOCATION:
The two (2) restrooms are located in Holiday Park adjacent to Pio Pico Avenue.
PROJECT DESCRIPTION:
This project includes rehabilitating the two (2) existing 400 square foot facilities
for wheelchair accessibility, installation of additional stalls and accessories, and
roof replacements.
PROJECT NEED:
This project will meet the Council goal of providing Top Quality Services and
will also comply with ADA standards.
FINANCING:
Purpose
Design
Construction
Inspection
Total Cost =
Estimated Cost
$27,000
$491,308
$12,500
$530,808
Funding Source
IRF
IRF
IRF
Holiday Page 27
CAPITAL PROJECT DESCRIPTION
FACILITIES MAINTENANCE - LAGUNA RIVIERA PARK RESTROOM REPLACEMENT
PROJECT NAME
3943
PROJECT NO.
PROJECT LOCATION MAP:
Lagunapk
I I I 1
PROJECT LOCATION:
Corner of Park Drive and Kelly Drive, adjacent to Kelly School.
PROJECT DESCRIPTION:
Remodel and/or replace existing park restrooms.
PROJECT NEED:
The facilities have deteriorated with age and constant use. To keep the park in
a top-quality condition, a complete remodel or reconstruction of the structure is
necessary.
FINANCING:
Purpose
Design
Construction
Inspection
Total Cost =
Estimated Cost
$10,000
$240,000
$10,000
$260,000
Funding Source
IRF
IRF
IRF
Page 28
II II II II II II II II II II IF 1 II II II 11 II • !
II II if i i II II i f i i i i i i i i 1 t i i t t t t i
CAPITAL PROJECT DESCRIPTION
FACILITIES MAINTENANCE - REPAIR/RECOAT GUARDRAIL PALOMAR AIRPORT
BRIDGE AT CARLSBAD BOULEVARD
PROJECT NAME
4700
PROJECT NO.
PROJECT LOCATION MAP:PROJECT LOCATION:
Palomar Airport Bridge over San Diego Northern Railway tracks at Carlsbad
Boulevard.
PROJECT DESCRIPTION:
On the existing bridge, remove existing coating on steel guardrail and apply a
new moisture cured urethane coating to steel. Lead paint removal may be
required which involves vacuum recovery system. Repair guardrail supports,
clean sidewalks, investigate cracks on concrete columns, and make remedial
repairs if required.
PROJECT NEED:
Existing bridge has severe corrosion on steel guardrails. Cracks at guardrail
supports need to be repaired with epoxy cement.
FINANCING:
Purpose
Study
Construction
Admin
Total Cost =
Estimated Cost
$10,000
$110,000
$10,000
$130,000
Funding Source
GCC
GCC
GCC
PARBridge
Page 29
CAPITAL PROJECT DESCRIPTION
FACILITIES MAINTENANCE - SENIOR CENTER COURTYARD RENOVATION
PROJECT NAME
3861
PROJECT NO.
PROJECT LOCATION MAP:PROJECT LOCATION:
Carlsbad Senior Center, 799 Pine Avenue.
PROJECT DESCRIPTION:
Re-landscape and upgrade the courtyard at the Carlsbad Senior Center
including planting, irrigation new planters, hardscape improvements and
possibly a water feature.
PROJECT NEED:
Landscaping in the Senior Center Courtyard has become overgrown during the
past 12 years. A new plan incorporating new plantings and development of
more user-friendly space is needed to make this feature of the facility more
usable by the many customers.
FINANCING:
Purpose
Design
Construction
Total Cost =
Estimated Cost Funding Source
$5,000
$25,000
$30,000
GCC
GCC
Senctryd
Page 30
II II II II II II II II II II II il tl II II 11 11 f 1 II
laifiitlilliifilililtitf i ! i i i I I I i I i I i
CAPITAL PROJECT DESCRIPTION
FACILITIES MAINTENANCE - STAGECOACH PARK PICNIC SHELTER
PROJECT NAME
3936
PROJECT NO.
PROJECT LOCATION MAP:PROJECT LOCATION:
Stagecoach Community Park, 3420 Camino de los Coches.
PROJECT DESCRIPTION:
Remove volleyball court and build picnic shelter.
PROJECT NEED:
To increase usage of Stagecoach Community Park by providing a shaded
picnic area near an athletic field.
FINANCING:
Purpose
Design
Construction
Admin/Inspection
Total Cost =
Estimated Cost
$15,000
$77,000
$8,000
$100,000
Funding Source
GCC
GCC
GCC
Picnic Page 31
CAPITAL PROJECT DESCRIPTION
FACILITIES MAINTENANCE - STAGECOACH PARK SYNTHETIC TURF FIELDS
PROJECT NAME
3937
PROJECT NO.
PROJECT LOCATION MAP:PROJECT LOCATION:
Stagecoach Park - Camino de los Coches
PROJECT DESCRIPTION:
Construct/install synthetic turf fields on field numbers 2 and 3 at Stagecoach
Park.
PROJECT NEED:
Existing fields are in very poor condition and they cannot take the constant
wear-and-tear from soccer and baseball activities. The growth in population
has created a demand for fields that cannot be met with prolonged periods of
closure. These fields will be open 365 days a year and maintenance cost can
be reduced.
FINANCING:
Purpose
Design
Construction
Admin/Inspection
Total Cost =
Estimated Cost Funding Source
$25,000
$1,618,000
$75,000
$1,718,000
IRF
IRF
IRF
Stgcoach2 Page 32
iiiiiiiiiiiiiiiiiiiiiiviiiiiiiiiiiriri
iliiiiiliilllliitliiiliitiifiiiiiiilil
CAPITAL PROJECT DESCRIPTION
FACILITIES MAINTENANCE - TOT LOT IMPROVEMENT PROJECTS
PROJECT NAME
3944
PROJECT NO.
PROJECT LOCATION MAP:
PROJECT.SITE
PROJECT
SITE
PROJECTSITE
PROJECT
SITE
ROJECT
SITE
PROJECT LOCATION:
• Stagecoach Park
• Holiday Park
• Scout House
PROJECT DESCRIPTION:
Hosp Grove
Laguna Riviera
Poinsettia Park
La Costa Canyon Park
This is the third and final phase for the tot lot improvement project. Phase III
includes removing and replacing tot lot equipment, and installation of a
rubberized surface.
PROJECT NEED:
This project is the final phase of updating existing playground equipment to
comply with ADA and safety standards.
FINANCING:
Purpose
Construction
Total Cost =
Estimated Cost
$327,260
$327,260
Funding Source
IRF
Tot lotNEW
Page 33
II II II II II II II II II II II II II II fl II
PARKS PROJECTS
CITYWIDE PARKS PROJECTS
FUNDING MATRIX FOR CITYWIDE PARKS PROJECTS
PROJ
NO.
3972
3866
4500
4500
FUND
NO.
39721
38661
45001
45002
PROJECT TITLE
BUSINESS PARK RECREATIONAL FACILITY
CARLSBAD MUNICIPAL GOLF COURSE
LAKE CALAVERA TRAILS MASTER PLAN/CONSTRUCTION
SENIOR CTR EXPANSION - 1ST FLOOR
SENIOR CTR EXPANSION - 2ND FLOOR
VETERAN'S MEMORIAL PARK
FUNDING
SOURCE
ZONES
GOLF COURSE
GCC
REDVL VILLAGE
GCC
CFD»1
TOTAL
BUDGET
3,103,900
51,323,681
598,750
1,082,044
529,162
21 ,672,786
FUTURE YEAR BUDGET AMOUNTS
YEAR1
2006-07
2,600,000
101,750
467,044
200,162
YEAR 2
2007-2008
YEAR 3
2008-2009
YEAR 4
2009-2010
YEARS
2010-2011
YEAR 6-10
2011-2016
10,836,393
BUILDOUT
2016-2021
3,103,900
10,836,393
li II II II PI II II II II II II II II II
Page 34
I I I I
ilililiitiiitliiiitiililii i i I i i i I i 1 t i
CAPITAL PROJECT DESCRIPTION
CITYWIDE PARKS PROJECTS - BUSINESS PARK RECREATIONAL FACILITY
PROJECT NAME
NONE
PROJECT NO.
PROJECT LOCATION MAP:PROJECT LOCATION:
In Zone 5, at the corner of Faraday and Camino Hills.
PROJECT DESCRIPTION:
In FY 98-99, the City acquired 13 acres to develop into the Business Park
Recreation Facility. Proposed amenities may include a fitness center,
swimming pool, ball fields, soccer fields, basketball, handball, volleyball courts,
picnic areas, jogging trails, etc. It is anticipated that staff will meet with the
business park community to gather input into the most needed amenities.
The City may explore privatization options for a portion of the development
(e.g., the fitness center), which may accelerate development Project, includes
1 % for public art.
PROJECT NEED:
Demand and need for recreational facilities within the industrial area identified
through a Parks and Recreation Commission subcommittee who conducted
two independent surveys and received input from Zone 5, 13, and 16
developers.
FINANCING:
Purpose
Design/Construction
Total Cost =
Estimated Cost Funding Source
$3,103,900 Zone 5 Fee
$3,103,900
Page 35
BUS PARK
CAPITAL PROJECT DESCRIPTION
CITYWIDE PARKS PROJECTS - CARLSBAD MUNICIPAL GOLF COURSE
PROJECT NAME
3972
PROJECT NO.
PROJECT LOCATION MAP;PROJECT LOCATION:
Palomar Airport Road and College Boulevard.
PROJECT DESCRIPTION:
Design and construct an 18-hole championship golf course. Work will include
grading, landscaping a clubhouse, access roads and utilities. The Golf Course
Steering Committee may consider additional features to be included.
PROJECT NEED:
Because of strong citizen interest, the Parks and Recreation Commission
recommended building a golf course. Part of the Parks and Recreation
Element of the General Plan.
FINANCING:
Purpose Estimated Cost
Design/Environmental $3,000,000
Construction $48,323,681
Funding Source
Golf Course Enterprise Fund
Golf Course Enterprise Fund
Total Cost =$51,323,681
Page 36
GOLFDEV
II II VI 11 II I 1 II II II II II II Bill II II 11 il II
il ii il il ii II il II II II li ti . s 11 ii t i 11 ii
CAPITAL PROJECT DESCRIPTION
CITYWIDE PARKS PROJECTS - LAKE CALAVERA TRAILS MASTER PLAN
PROJECT NAME
3866
PROJECT NO.
PROJECT LOCATION MAP:
LAKE
MAVERA
PROJECT
PROJECT LOCATION:
In the Northeast Quadrant - Lake Calavera City Mitigation Site.
PROJECT DESCRIPTION:
Develop a Master Plan for a public multi-use, recreational trail system situated
within a 266-acre property owned by the City. Trails to be developed as multi-
purpose non-paved recreational trails with trailhead parking area, signage,
benches, litter receptacles, interpretive signage and passive picnic areas.
Project includes utilizing volunteers to construct approximately 2.5 miles of the
proposed 5 miles of trails.
PROJECT NEED:
This project is part of the citywide trails program and trails in the Lake Calavera
area have been identified in the City's Open Space and Conservation Resource
Management Plan for the Lake Calavera area, as well as the Trails Feasibility
Study done in 1990. Citizens surveys indicate the desire to have increased
access to open space and trails. Voters approved Prop C in 2002 which
identified trails as one of the recreational facilities they would support funding.
FINANCING:
Purpose
Environmental
Design
Construction
Total Cost =
Estimated Cost
$35,000
$50,000
$513,750
$598,750
Funding Source
GCC
GCC
GCC
Annual Operating Cost = $20,000
Lake cal Page 37
CAPITAL PROJECT DESCRIPTION
CITYWIDE PARKS PROJECTS - SENIOR CENTER EXPANSION 1ST FLOOR
PROJECT NAME
4500
PROJECT NO.
PROJECT LOCATION MAP:
PROJECT
SITE
PROJECT LOCATION:
Senior Center Building located at Pine Avenue and Harding Street.
PROJECT DESCRIPTION:
Tenant improvements to the 1 floor area of existing Senior Center.
Improvements include exercise rooms, art room, t.v. room, multi-purpose room,
game room, health screening room, and computer room.
PROJECT NEED;
Needed to meet the needs of a growing senior population and expanding
program needs.
FINANCING:
Purpose
Design/Construction
Total Cost =
Estimated Cost
$1,082,044
$1,082,044
Funding Source
Redev Village
SeniorCtrl
Page 38
II il | l II II II II II I I II II II II II II II II II
li E i i ii i ii ii li i 1 ii i i i i ii
CAPITAL PROJECT DESCRIPTION
i i i il i 1 i 1 l i
CITYWIDE PARKS PROJECTS - SENIOR CENTER EXPANSION 2ND FLOOR
PROJECT NAME
4500
PROJECT NO.
PROJECT LOCATION MAP:
PROJECT
SITE
PROJECT LOCATION:
Senior Center Building located at Pine Avenue and Harding Street.
PROJECT DESCRIPTION:
Tenant improvements to the 2nd floor area of existing Senior Center
(approximately 5,770 square feet) into City offices.
PROJECT NEED:
Needed office space for City functions.
FINANCING:
Purpose Estimated Cost
Design/Construction $529,162
Total Cost = $529,162
Funding Source
GCC
SeniorCtr2
Page 39
CAPITAL PROJECT DESCRIPTION
CITYWIDE PARKS PROJECTS - VETERAN'S MEMORIAL PARK
PROJECT NAME
NONE
PROJECT NO.
PROJECT LOCATION MAP:PROJECT LOCATION:
This property is located south and east of Agua Hedionda Lagoon, near the
geographic center of Carlsbad.
PROJECT DESCRIPTION:
The Master Plan for development of Veteran's Memorial Park includes the
following improvements: streets, utilities, community leisure needs, open
space interpretive area, parking and maintenance facility. Other suggested
uses for this park area include amphitheater complex, sports complex,
conference center and numerous other active/passive recreational amenities.
Project funding includes 1% for public art.
PROJECT NEED:
The Macario Canyon property has been under City lease or ownership for a
number of years. The development of this property, since it is centrally located,
would provide the needed parkland for all quadrants at buildout. Part of the
Parks and Recreation Element of the General Plan.
FINANCING:
Purpose
Design/Construction
Total Cost =
Estimated Cost
$21,672,786
$21,672,786
Funding Source
CFD#1
VETERAN Page 40
II Ii II II II II II II II II II * 1 II II II II II • « f 1
I I l I i l i i i I i l i i i f t i t i t i t i i f i i a i i i J
NORTHWEST QUADRANT PARKS PROJECTS
FUNDING MATRIX FOR NORTHWEST QUADRANT PARKS PROJECTS
PROJ
NO.
3802
3802
FUND
NO.
38022
38023
PROJECT TITLE
PINE AVENUE PARK - PHASE 1
PINE AVENUE PARK - PHASE 1 (UNDERGROUNDING)
PINE AVENUE PARK - PINE COMMUNITY BUILDING - PHASE II
PINE AVENUE PARK - PINE COMMUNITY BUILDING - PHASE II
FUNDING
SOURCE
PFF
PIL-NW
PIL-NW
PFF
TOTAL
BUDGET
7,082,000
576,000
1,664,130
7,360,210
FUTURE YEAR BUDGET AMOUNTS
YEAR1
2006-07
YEAR 2
2007-2008
YEAR 3
2008-2009
YEAR 4
2009-2010
563,794
YEARS
2010-2011
1,664,130
6,796,416
YEAR 6-10
2011-2016
BUILDOUT
2016-2021
11 ii ii ii ii ii ii ii ii ii 11 PI 11 ii ii
Page 41
I I I I
11 II II II II II II ti i i il till I i i i 1
CAPITAL PROJECT DESCRIPTION
NORTHWEST QUADRANT PARKS - PINE AVENUE PARK PHASE I
PROJECT NAME
3802
PROJECT NO.
PROJECT LOCATION MAP:
SITE
PROJECT LOCATION:
Pine School site; within the block of Harding, Pine, Chestnut and Madison.
PROJECT DESCRIPTION:
Develop seven (7) acres of land as a park. Development may include lighted
baseball fields, lighted multi-use turfed area, roofed picnic structure, parking
lot, tot-lot and landscaping. Also includes 1% for public art. Project includes
undergrounding of existing overhead utility lines on adjacent streets.
PROJECT NEED:
Required to meet Growth Management Standards and identified in the Parks
and Recreation Element of the General Plan.
FINANCING:
Purpose
Design
Construction
Admin/Inspection
Total Cost =
Estimated Cost
$1,040,000
$6,148,000
$470,000
Funding Source
PFF
PFF/PIL-NW
PFF
$7,658,000
Annual Operating Cost = $120,000
Parksit2 Page 42
CAPITAL PROJECT DESCRIPTION
NONE
NORTHWEST QUADRANT PARKS - PINE AVENUE PARK - PHASE II (COMMUNITY BUILDING) PROJECT NO.
PROJECT NAME
PROJECT LOCATION MAP:
SITE
PROJECT LOCATION:
Pine School site; within the block of Harding, Pine, Chestnut and Madison.
PROJECT DESCRIPTION:
Construct a 20,000 square foot community facility/gymnasium. Facility will
include basketball, volleyball, gymnastics, multi-purpose rooms, meeting
rooms, teen center, and office space.
PROJECT NEED:
Required to meet Growth Management Standards, identified in the Parks and
Recreation Element of the General Plan, and meets Recreation Facility
Guidelines for one community center per quadrant.
FINANCING:
Purpose
Design/Admin
Construction
Total Cost =
Estimated Cost
$1,664,130
$7,360,210
$9,024,340
Funding Source
PIL-NW
PFF
Pinepkll Page 43
il li ii ii ii ii ii t i 11 if i j ii 11 ti tl ii if ii if
NORTHEAST QUADRANT PARKS PROJECTS
FUNDING MATRIX FOR NORTHEAST QUADRANT PARKS PROJECTS
PROJ
NO.
3856
3698
3801
FUND
NO.
38561
36981
38011
PROJECT TITLE
HIDDEN CANYON PARK (22.3 ACRES)
PARK SITE ACQUISITION (15 ACRES) NE QUADRANT PARK
PARK SITE DEVELOPMENT (15 ACRES)
FUNDING
SOURCE
PIL-NE
PFF
PIL-NE
TOTAL
BUDGET
1,886,766
4,550,000
4,000,000
FUTURE YEAR BUDGET AMOUNTS
YEAR1
2006-07
YEAR 2
2007-2008
YEAR 3
2008-2009
YEAR 4
2009-2010
YEARS
2010-2011
YEAR 6-10
2011-2016
BUILDOUT
2016-2021
4,000,000
f ! I I I I f I I I I ! I 1 I 1 I I I I I 1 I I I 1 I I I I 1 I I 1
Page 44
II II
t l li i i i l ii il if II il 11 i I i i ti
CAPITAL PROJECT DESCRIPTION
NORTHEAST QUADRANT PARKS - HIDDEN CANYON PARK
PROJECT NAME
i i i l i i i l if
3856
PROJECT NO.
PROJECT LOCATION MAP:PROJECT LOCATION:
This project is located in the northeast quadrant on the north side of Carlsbad
Village Drive, west of Concord Street.
PROJECT DESCRIPTION:
This 22.3 acre site is constrained by steep slopes, sensitive habitat and power
lines. For that reason, grading and development will be confined to a small
area. Park development may consist of limited grading and construction of two
tot-lots, restroom, a picnic area, a level turfed area, a parking lot at Vancouver
Street, expansion of gravel parking lot at Dog Park, and a trail system. Project
funding includes 1 % for public art.
PROJECT NEED:
Part of the Parks and Recreation Element of the General Plan and required to
meet Growth Management Standards. Currently there are numerous
apartments and attached housing projects in this area with a large number of
children requiring recreational area.
FINANCING:
Purpose
Design
Construction
Admin/Inspection
Total Cost =
Estimated Cost
$90,000
$1,664,766
$132,000
Funding Source
PIL-NE
PIL-NE
PIL-NE
$1,886,766
Annual Operating Cost = $120,000
Page 45
HIDCNYPK
CAPITAL PROJECT DESCRIPTION
NORTHEAST QUADRANT PARK - PARK SITE ACQUISITION
PROJECT NAME
3698
PROJECT NO.
PROJECT LOCATION MAP:
HWY 78
PROJECT
AREA
PROJECT LOCATION:
In the northeast quadrant, possibly within the Robertson Ranch development.
PROJECT DESCRIPTION:
Acquire ±15 acres for future development of ball fields.
PROJECT NEED:
Because of development constraints, Hidden Valley Park was unable to fulfill
the need for active ball fields. Therefore, ±15 acres will be acquired
somewhere in the northeast quadrant for ballfield development to meet the
City's guidelines for numbers of ball fields per quadrant.
FINANCING:
Purpose
Land Acquisition
Total Cost =
Estimated Cost
$4,550,000
$4,550,000
Funding Source
PFF
NEQUAD_1 Page 46
I I I 1 Ft • 1 • I II II II II I I I I II II II II II II II II
tl il II II ii i i i i if ii ilii I i I i i i I i i
CAPITAL PROJECT DESCRIPTION
NORTHEAST QUADRANT PARKS - PARK SITE DEVELOPMENT
PROJECT NAME
3801
PROJECT NO.
PROJECT LOCATION MAP:
HWY 18
PROJECT
AREA
PROJECT LOCATION:
In future Robertson Ranch development near the corner of Cannon Road and
El Camino Real.
PROJECT DESCRIPTION:
Develop ±15 acres for soccer fields with restrooms and parking.
PROJECT NEED:
Fifteen (15) acres will be developed somewhere in the northeast quadrant for
sports fields to meet the City's guidelines for numbers of sports fields per
quadrant.
FINANCING:
Purpose
Construction
Total Cost =
Estimated Cost
$4,000,000
$4,000,000
Funding Source
PIL-NE
NEQUAD 3
Page 47
i i i 1 I I I i i 1 i 1 1 1 i 1 i 1 I i i f i i I i I i i i i i i i i i 1
SOUTHWEST QUADRANT PARKS PROJECTS
FUNDING MATRIX FOR SOUTHWEST QUADRANT PARKS PROJECTS
PROJ
NO.
3699
3649
4502
FUND
NO.
36991
36491
45021
PROJECT TITLE
AVIARA COMMUNITY PARK (24.25 ACRES) *
AVIARA COMMUNITY PARK COMMUNITY BUILDING
AVIARA COMMUNITY PARK COMMUNITY BUILDING
AVIARA REIMBURSEMENT AGREEMENT
POINSETTIA COMMUNITY PARK - PHASE II
FUNDING
SOURCE
PFF
PFF
PIL-SW
P1L-SW
PFF
TOTAL
BUDGET
10,700,000
7,117,834
2,516,875
238,000
14,115,481
FUTURE YEAR BUDGET AMOUNTS
YEAR1
2006-07
89,200
YEAR 2
2007-2008
YEAR 3
2008-2009
YEAR 4
2009-2010
YEARS
2010-2011
882,824
YEAR 6-10
2011-2016
12,143,457
BUILDOUT
2016-2021
7,117,834
2,516,875
Page 48
II II II II II II II II II II * f 11 II II II II II II II
i i i 1 i ii I i l f l I 1 f i i i i l ; l i t i i i i l i f
CAPITAL PROJECT DESCRIPTION
SOUTHWEST QUADRANT PARKS - AVIARA COMMUNITY PARK - PHASE I
PROJECT NAME
11 ii i l
3699
PROJECT NO.
PROJECT LOCATION MAP:
'PROJECT
SITE
PROJECT LOCATION:
Northwest corner of Poinsettia Lane and Ambrosia Road.
PROJECT DESCRIPTION:
Construction of a 24-acre community park that would provide one lighted adult
soccer field, one ballfield, two 1/2 court basketball court, tot-lot, open turf and
picnic area, parking, and a maintenance building. Project includes 1% for
Public Art.
PROJECT NEED:
Required to meet Growth Management Standards and identified in the
Parks and Recreation Element of the General Plan.
FINANCING:
Purpose
Planning/Study
Environmental
Design
Construction
Total Cost =
Estimated Cost
$235,000
$15,000
$250,000
$10,200,000
Funding Source
PFF
PFF
PFF
PFF
$10,700,000
Annual Operating Cost = $340,000
Zone19-l Page 49
CAPITAL PROJECT DESCRIPTION
NONE
SOUTHWEST QUADRANT PARKS - AVIARA COMMUNITY PARK - PHASE II (COMMUNITY BUILDING)
PROJECT NAME
PROJECT NO.
PROJECT LOCATION MAP:
'PROJECT
SITE
PROJECT LOCATION:
In the southwest quadrant at the northern end of the Aviara community at the
intersection of Poinsettia Lane and Ambrosia.
PROJECT DESCRIPTION:
Construction of a 18,000 square toot community facility that would include
meeting and activity rooms and park offices. Project includes 1% for Public Art.
PROJECT NEED:
Required to meet Growth Management Standards and identified in the
Parks and Recreation Element of the General Plan and meets the Recreation
Facility Guidelines.
FINANCING:
Purpose
Design/Construction
Design/Construction
Total Cost =
Estimated Cost
$2,516,875
$7,117,834
$9,634,709
Funding Source
PIL-SW
PFF
Zone19ll
II II II II II II II II II fl
Page 50
f 1 ft I II II II ft] II II
II II II II il II II II tl t i tl f! f I
CAPITAL PROJECT DESCRIPTION
i i i i i i 1 I
3649
SOUTHWEST QUADRANT PARKS - AVIARA REIMBURSEMENT AGREEMENT
PROJECT NAME
PROJECT NO.
PROJECT LOCATION MAP:
PROJECT
SITE
PROJECT LOCATION:
In the southwest quadrant, at the northern tip of Zone 19, north of
Poinsettia Lane and west of El Camino Real.
PROJECT DESCRIPTION:
This is a reimbursement to the Aviara Land Associates Company made in
accordance with the Aviara Master Plan parks agreement relating to the
acquisition of property for the future Zone 19 park site.
PROJECT NEED:
The Zone 19 park is required to meet growth management for park land within
the southwest quadrant.
FINANCING:
Purpose
Reimbursement
Total Cost =
Estimated Cost
$238,000
$238,000
Funding Source
PIL-SW
Aviareim Page 51
CAPITAL PROJECT DESCRIPTION
SOUTHWEST QUADRANT PARKS - POINSETTIA COMMUNITY PARK (PHASE II)
PROJECT NAME
4502
PROJECT NO.
PROJECT LOCATION MAP:
PROJECT
'SITE
PROJECT LOCATION:
Poinsettia Community Park in the southwest quadrant east of Paeo del Norte
between Palomar Airport Road and Poinsettia Lane.
PROJECT DESCRIPTION:
Phase II of this 42 acre park includes development of the remainder of
the facilities called out in the Master Plan and not developed in earlier
Phases. Amenities will include a community facility/gymnasium, enclosed
soccer field, tot lot, picnic areas, tennis complex, and additional parking.
Includes 1 % for public art.
PROJECT NEED:
Required to meet Growth Management Standards and identified in the Parks
and Recreation Element of the General Plan. Also needed to meet the
Recreation Facility Guidelines.
FINANCING:
Purpose
Design/Admin/lnsp
Construction
Total Cost =
Estimated Cost
$950,000
$13,165,481
$14,115,481
Funding Source
PFF
PFF
PoinsJI
i i t i i i i i i i i i i i i i i i i i r i r i
Page 52
ii i I 11 • j 11 t i
tliiiliiilllililtitiiliiiiiilSiliilil
SOUTHEAST QUADRANT PARKS PROJECTS
FUNDING MATRIX FOR SOUTHEAST QUADRANT PARKS PROJECTS
PROJ
NO.
3837
3925
3925
3961
3961
4501
FUND
NO.
38372
39251
39252
39611
39612
45011
PROJECT TITLE
ALGA NORTH PARK - PHASE I (30 ACRES)
ALGA NORTE PARK - PHASE II (POOL)
ALGA NORTE PARK - PHASE II (POOL) PROP C FUNDS
LEO CARRILLO - HISTORIC BARN (50% GRANT)
CARRILLO BARN RESTORATION
LEO CARRILLO PARK - EROSION CONTROL
LEO CARRILLO PARK - PHASE III
LEO CARRILLO PARK - PHASE III
FUNDING
SOURCE
PFF
PFF
GCC
GCC
PFF
GCC
PFF
PIL-SE
TOTAL
BUDGET
15,912,570
12,099,695
11,239,000
500,000
33,000
180,000
1,987,400
836,800
FUTURE YEAR BUDGET AMOUNTS
YEAR1
2006-07
3,351,262
5,391,695
104,930
YEAR 2
2007-2008
YEARS
2008-2009
YEAR 4
2009-2010
YEARS
2010-2011
YEAR 6-10
2011-2016
BUILDOUT
2016-2021
1,987,400
836,800
11 II II II 11 11 11 II 11 II 11 II II II I ] I 1 I 1 Paqe 53t..J I 1
II II II II II II II II (1 I I 1 I i i l i i t i I I i I
CAPITAL PROJECT DESCRIPTION
SOUTHEAST QUADRANT PARKS - ALGA NORTE PARK - PHASE I
PROJECT NAME
3872
PROJECT NO.
PROJECT LOCATION MAP:
PROJECT
PROJECT LOCATION:
In the Southeast Quadrant, east of El Camino Real and north of and adjacent
to future Poinsettia Lane.
PROJECT DESCRIPTION:
The first phase of this project will include development of approximately
30 acres of the proposed total of 30 acres of park. Amenities include ballfields,
basketball courts, picnic areas, restrooms, parking, skate park, dog park,
tot lots, etc. Also included is 1 % for Public Art.
PROJECT NEED:
Required to meet Growth Management Standards and identified in the Parks
and Recreation Element of the General Plan.
FINANCING:
Purpose
Design
Construction
Admin/Inspection
Total Cost =
Estimated Cost
$1,000,000
$13,755,570
$1,157,000
$15,912,570
Funding Source
PFF
PFF
PFF
Annual Operating Cost = $347,000
ALGANOR2
Page 54
CAPITAL PROJECT DESCRIPTION
SOUTHEAST QUADRANT PARKS - ALGA NORTE PARK PHASE II (AQUATICS CENTER)
PROJECT NAME
3925
PROJECT NO.
PROJECT LOCATION MAP:
PROJECT
SITE
ALGANOR1
II II II II II II II
PROJECT LOCATION:
In the Southeast Quadrant, east of El Camino Real and north and adjacent to
the future Poinsettia Lane.
PROJECT DESCRIPTION:
Construction of a 50 meter pool with a pool office facility, showers/restrooms,
parking and perimeter landscaping.
PROJECT NEED:
Alga Node Park is identified in the Parks and Recreation Element as the site of
a future public swimming pool. The existing swim complex is currently past
capacity. A new 50 meter pool will assure that adequate swimming facilities will
be available for current and future residents. Also includes 1% for Public Art.
FINANCING:
Purpose
Design
Construction
Construction
Total Cost =
Estimated Cost
$2,106,000
$9,993,695
$11,239,000
$23,338,695
Funding Source
PFF
PFF
GCC (Prop C)
Annual Operating Cost = $453,000
Page 55
mm mm i i
il II II If i i il II if i I i i i 1 . i i I i i i I il i 1 i i
CAPITAL PROJECT DESCRIPTION
SOUTHEAST QUADRANT PARKS - CARRILLO RANCH PHASE Hi BARWTHEATER
PROJECT NAME
3961
PROJECT NO.
PROJECT LOCATION MAP:
"«U vV^v/S.
PROJECT LOCATION:
Within Carrillo Ranch Park.
PROJECT DESCRIPTION:
Construction of the "Barn/Theater" portion of future Phase III of Carrillo Ranch.
Includes foundation, roof, and wall stabilization and miscellaneous other
renovations.
PROJECT NEED:
The Carrillo Ranch Master Plan calls for the renovation and adoptive reuse of
the barn into a theater for visitor orientation presentations, showing old
Leo Carrillo films, and various educational purposes.
The project will also provide revenue generating opportunities as it can be
rented as a meeting facility.
FINANCING:
Purpose
Design
Construction
Construction
Administration
Total Cost =
Estimated Cost
$66,000
$412,000
$33,000
$22,000
$533,000
Funding Source
GCC
GCC
PFF
GCC
CarrilloBarn Page 56
CAPITAL PROJECT DESCRIPTION
SOUTHEAST QUADRANT PARKS - CARRILLO RANCH EROSION REPAIR
PROJECT NAME
4501
PROJECT NO.
PROJECT LOCATION MAP:PROJECT LOCATION:
Carrillo Ranch Park.
PROJECT DESCRIPTION:
Correct erosion problems in select decomposed granite paving areas of the
recently completed Carrillo Ranch Phase II project, including adding drainage
structures and stabilization binders.
PROJECT NEED:
Certain areas of decomposed granite paving have incurred severe erosion
during recent rain storms. Sediment from erosion has caused an unsafe park
condition resulting in park closures, continues to require expensive
maintenance, and may pose sedimentation problems in the two creeks that
border the park.
FINANCING:
Purpose
Design
Construction
Admin/Inspection
Total Cost =
Estimated Cost
$5,000
$169,400
$5,600
$180,000
Funding Source
GCC
GCC
GCC
CarrilloErosion
I I I I II II II II II II II II VI
Page 57
ft 1 II II II II II ft I
ii i 1 II 11 ii il il i 1 i i i i i i i i
CAPITAL PROJECT DESCRIPTION
SOUTHEAST QUADRANT PARKS - LEO CARRILLO PARK - PHASE
PROJECT NAME
NONE
PROJECT NO.
PROJECT LOCATION MAP:PROJECT LOCATION:
In the Southeast Quadrant, approximately one mile south of Palomar Airport
Road adjacent to the future extension of Melrose Drive and future Poinsettia
Lane.
PROJECT DESCRIPTION:
Development of historical ranch into a community park. Project includes
completion of remainder of Master Plan (not completed in Phase II).
Project includes renovation of additional buildings, construction of additional
restrooms, arboretum area, additional landscaping, etc.
PROJECT NEED:
Required to meet Growth Management Standards and identified in the Parks
and Recreation Element of the General Plan.
FINANCING:
Purpose
Design/Construction
Design/Construction
Total Cost =
Estimated Cost
$1,987,400
$836,800
$2,824,200
Funding Source
PFF
PIL-SE
LEOCRIII
Page 58
ii ii ii r i ii ii ii ii ri ii ii ii i i r i r i 11
DRAINAGE PROJECTS
J I I I I I I : 1 :, I i , . I I I 1 j , 1 V I , I 1 t I I 1 I I I 1 I j
DRAINAGE PROJECTS
FUNDING MATRIX FOR DRAINAGE PROJECTS
PROJ
NO.
3338
3804
36241
3636
3636
6601
3622
3934
6600
6602
3872
3681
FUND
NO.
33381
38041
36241
36363
36363
66011
36225
39341
66001
66021
38721
36811
PROJECT TITLE
AGUA HEDIONDA CHANNEL (PLDA "B")
AVIARA PARKWAY STORM DRAIN REIMBURSEMENT (PLDA "C")
CALLE QAVANZO DRAINAGE
CARLSBAD BLVD STORM DRAIN REPLACEMENT
COLLEGE BLVD. BRIDGE FACILITY BL (REIMB./PLDA "B")
COLLEGE BLVD/CANNON RD (BASIN BJB - REIMB./PLDA "B") (FEMA + PLD)
COLLEGE BLVD/CANNON RD (BJ AND CALAVERA CR. CHANNEL)
CYNTHIA LANE STORM DRAIN
FARADAY/MELROSE DRAINAGE FACILITIES (PLDA "B")
GABBIANO LANE STORM DRAIN MODIFICATION
HIGHLAND DRIVE - BETWEEN PINE & BASSWOOD
KELLY DRIVE CHANNEL REPAIR
LA COSTA AVE STORM DRAIN REPLACEMENT
MASTER PLAN UPDATE
MISCELLANEOUS MASTER DRAINAGE FACILITIES
MISCELLANEOUS ROAD SUBDRAINS
PARK DRIVE AND TAMARACK AVENUE STORM DRAIN (PLDA "B")
RIDGECREST DRAINAGE IMPROVEMENTS
ROMERIA DRAINAGE IMPROVEMENTS
TAMARACK AND ECR STORM DRAIN AND SILT. BASIN (REIMB./PLDA "B")
FUNDING
SOURCE
PLD
PLD
GCC
IRF
PLD
PLD
PLD
IRF
PLD
GAS TAX
GCC
IRF
IRF
PLD
PLD
GAS TAX
PLD
GCC
GCC
PLD
TOTAL
BUDGET
1,680,522
378,880
62,500
80,000
1 ,783,000
830,910
2,778,833
100,000
300,000
35,000
240,000
895,000
492,150
454,933
10,936,000
485,000
610,000
117,500
274,000
1,279,000
FUTURE YEAR BUDGET AMOUNTS
YEAR1
2006-07
62,500
200,000
117,500
274,000
YEAR 2
2007-2008
196,800
240,000
YEARS
2008-2009
455,000
YEAR 4
2009-2010
YEARS
2010-2011
YEAR 6-10
2011-2016
1 ,783,000
610,000
BUILDOUT
2016-2021
10,936,000
1,279,000
ii ii mm mm mm mm mm 11 t i i i 11 i i • i ti ti 11 11
Page 59
fill
iiilililfliiiiiiititcitiiiitii
CAPITAL PROJECT DESCRIPTION
DRAINAGE PROJECTS - AGUA HEDIONDA CHANNEL IMPROVEMENTS
PROJECT NAME
i i i i < i i I
3338
PROJECT NO.
PROJECT LOCATION MAP:
PROJECTSITE
PROJECT LOCATION:
Along the Agua Hedionda Creek Channel from the downstream edge of the
Cannon Road bridge to approximately 3,100 feet upstream of the El Camino
Real bridge.
PROJECT DESCRIPTION:
The proposed work includes dredging approximately 40,000 cubic yards of
accumulated sediment from within the Agua Hedionda channel, widening and
improvement of the channel at the confluence of the Agua Hedionda and
Calavera Creeks, reconstruction of the bridge piers under El Camino Real to
streamline flows and reduce potential blockages, stabilization of the Calavera
Creek channel and mitigation work for the impacts associated with the channel
improvement project. Further studies will determine the scope of the mitigation
work and the construction costs associated with mitigation and construction.
The project may also include removal of the weir wall at the confluence of
Calavera Creek with Little Encinas Creek and modifications to the outlet
structure at Basin BJB.
PROJECT NEED:
Required by the Drainage Master Plan to mitigate potential flooding impacts to
the Rancho Carlsbad Mobile Home Park development.
FINANCING:
Purpose
Studies/Design
Total Cost =
Estimated Cost
$1,680,522
$1,680,522
Funding Source
PLDA "B" Fees
STORMDR1 Page 60
CAPITAL PROJECT DESCRIPTION
DRAINAGE PROJECTS - AVIARA PARKWAY STORM DRAIN REIMBURSEMENT
PROJECT NAME
3804
PROJECT NO.
PROJECT LOCATION MAP:
'PROJECT
PROJECT LOCATION:
Along Aviara Parkway from Cobblestone Road to Encinas Creek.
PROJECT DESCRIPTION:
Reimbursement to developers for the construction of portions of Master Storm
Drainage Facilities "C" and CFA. The constructed facility consisted of
approximately 526 feet of 72-inch RCP and 1,257 feet of 66-inch RCP. The
developer also constructed a portion of Master Storm Drainage Facility "C"
consisting of approximately 150 feet of double barreled 8-foot by 8-foot box
culvert beneath Aviara Parkway at Encinas Creek. A complete audit of
construction costs for eligibility requirements will be undertaken prior to
reimbursing the developer from the PLDA fund. The constructed facilities are
in excess of the facilities identified in the Master Drainage Plan.
Reimbursement will not exceed the value of the improvement costs as
estimated in the Master Drainage Plan without first amending the Master
Drainage Plan and revising the PLDA fees accordingly.
PROJECT NEED:
The above described Master Drainage Plan facilities were recently constructed
by a developer. Pursuant to the provisions of the Local Drainage Area (PLDA)
Fee Program, the developer is eligible to receive reimbursement for the cost of
constructing these facilities in excess of the PLDA fees required of the
developing project.
FINANCING:
Purpose
Reimbursement
Total Cost =
Estimated Cost
$378,880
$378,880
Funding Source
PLDA "C"
Avia drn Page 61
I i I 1 I I I 1 1 I I I I 1 I 1 1 1 I I t I t 1 I I I 1 • I * I i I «* « •
i i li t 1 i i i t i i i i i i i i i i i i .
CAPITAL PROJECT DESCRIPTION
i i i i if it
NONE
DRAINAGE PROJECTS - CALLE GAVANZO SUBSURFACE DRAINAGE IMPROVEMENT
PROJECT NAME
PROJECT NO.
PROJECT LOCATION MAP:PROJECT LOCATION:
Calle Gavanzo Street.
PROJECT DESCRIPTION:
West side of Calle Gavanzo shows signs of a subsurface drainage problem.
The problem causes continuous wet pavement on the west side of the street.
The project will require installation of subsurface draining in the street and
street surface repair.
PROJECT NEED:
The subsurface drainage problem causes pavement damage from continuous
wet pavement. In addition, the pavement is slowly separating from the gutter.
Local residents state drains were installed on the east side of the street in
previous years.
FINANCING:
Purpose
Design
Construction
Admin/Inspection
Total Cost =
Estimated Cost
$7,500
$50,000
$5,000
$62,500
Funding Source
GCC
GCC
GCC
CALLE GAV Page 62
CAPITAL PROJECT DESCRIPTION
DRAINAGE PROJECTS - CARLSBAD BOULEVARD STORM DRAIN REPLACEMENT
PROJECT NAME
3624
PROJECT NO.
PROJECT LOCATION MAP:PROJECT LOCATION:
From Carlsbad Boulevard to the San Diego Northern Railroad tracks just south
of the railroad overcrossing.
PROJECT DESCRIPTION:
Relocate and replace approximately 350 feet of 18-inch corrugated metal
storm drain pipe (CMP) with a reinforced concrete storm drain pipe. Project
would include installation of new storm drain inlets and an outlet.
PROJECT NEED:
The existing CMP has corroded away and drainage water is now undermining
the soil column above the pipe. Recently, a sinkhole developed which required
extensive maintenance repairs. The pipe crosses private property along a
previously vacated street right-of-way. At one point, the pipe runs beneath a
private structure built many years ago over the vacated street. Replacing the
pipe will reduce the potential of local flooding on Carlsbad Boulevard and/or
damage to the structure above the pipe as well as additional maintenance
repairs.
FINANCING:
Purpose
Planning/Study
Design
Construction
Total Cost =
Estimated Cost
$7,000
$20,000
$53,000
$80,000
Funding Source
IRF
IRF
IRF
CBSTRMDR Pa9e 63
II II I 1 II II II I I II II II VI I 1 I 1 II II II II II II
t I i I i i i i i f i i i I f I l t i i i i i i 1 I I I i I i 1 i l i I
CAPITAL PROJECT DESCRIPTION
DRAINAGE PROJECTS - COLLEGE BOULEVARD BRIDGE FACILITY
PROJECT NAME
PROJECT NO.
PROJECT LOCATION MAP:
LAKE
t CMAVBRA
PROJECT LOCATION:
At the College Boulevard crossing of the Agua Hedionda Creek.
PROJECT DESCRIPTION:
Construction of a bridge structure for the College Boulevard crossing of the
Agua Hedionda Creek.
PROJECT NEED:
The project is needed to protect College Boulevard from flood damage.
FINANCING:
Purpose Estimated Cost Funding Source
Design/Construction $1,783,000 PLDA "B"
Total Cost = $1,783,000
Collbrdg
Page 64
CAPITAL PROJECT DESCRIPTION
DRAINAGE PROJECTS -COLLEGE BOULEVARD / CANNON ROAD (DRAINAGE BASIN BJB1
PROJECT NAME
3636
PROJECT NO.
PROJECT LOCATION MAP:PROJECT LOCATION;
Within and adjacent to Calavera Creek located at the northeast corner of the
Cannon Road and College Boulevard intersection.
PROJECT DESCRIPTION:
Construction of a 49 acre-foot drainage retention basin covering approximately
15 acres of land within and adjacent to Calavera Creek located northeast of the
College Boulevard and Cannon Road intersection. The project includes
construction of a 11-foot by 7-foot reinforced concrete box extending across
the College Boulevard and Cannon Road intersection, a 72-inch low flow pipe
draining the retention basin, a concrete spillway and rock slope protection.
PROJECT NEED:
This project is one of a series of projects designed to help reduce flooding
along the Agua Hedionda Creek especially within the RCMHP community.
The series of projects include the construction of four floodwater retention
basins, including Basin BJ, Basin BJB, the Melrose Drive Basin and the
Faraday Avenue basin, and the dredging and/or improvement of the
Agua Hedionda and Calavera Creek channels.
FINANCING:
Purpose
Reimbursement
Reimbursement
Total Cost =
Estimated Cost
$ 291,247
$539,663
$830,910
Funding Source
PLDA "B"
Fed Grant
Basin-BJB
i i i i r i r i BTI t •
Page 65
II II II II II II II II II II
i i i i i i i i i i i i i i 1 i i i ' i i i i i 1
CAPITAL PROJECT DESCRIPTION
DRAINAGE PROJECTS - COLLEGE BOULEVARD / CANNON ROAD
(PALAVERA CREEK CHANNEL AND DRAINAGE BASIN BJ)
PROJECT NAME
li i i i i t i
3636
PROJECT NO.
PROJECT LOCATION MAP:
PROJECT
SITE
PROJECT LOCATION:
Along Calavera Creek from El Camino Real to future College Boulevard and
within the Little Encinas Creek immediately east of the future
College Boulevard.
PROJECT DESCRIPTION:
Construction of a 49 acre-foot drainage retention basin covering approximately
8 acres of land within and adjacent to the Little Encinas Creek located east of
the future College Boulevard at the northeast corner of the Rancho Carlsbad
Mobile Home Park (RCMHP). Included with the project is a reinforced concrete
box culvert under future College Boulevard. Also included is an 84 inch storm
drain pipe proposed along the north side of Cannon Road, designed to take
overflow drainage from the Calavera Creek. The construction of the retention
basin requires relocation of an existing RV storage lot, community garden and
maintenance yard owned by the RCMHP property owners association. The
proposed site of the relocated facility is north of the RCMHP and south of
Cannon Road.
PROJECT NEED:
This project is one in a series of projects designed to help reduce flooding
along the Agua Hedionda and Calavera Creeks primarily within the RCMHP
community. The project also eliminates flooding of El Camino Real during a
100-year flood event. The series of projects include the construction of four
floodwater retention basins, including Basin BJ, Basin BJB, the Melrose Drive
Basin and the Faraday Avenue basin, and the dredging and/or improvement of
the Agua Hedionda and Calavera Creek channels.
FINANCING;
Purpose
Total Cost
Total Cost =
Estimated Cost
$2,778,833
$2,778,833
Funding Source
PLDA "B"
Basin_BJ Page 66
CAPITAL PROJECT DESCRIPTION
DRAINAGE PROJECTS - CYNTHIA LANE STORM DRAIN
PROJECT NAME
6601
PROJECT NO.
PROJECT LOCATION MAP:PROJECT LOCATION:
Cynthia Lane
PROJECT DESCRIPTION:
Replace existing 18" CMP with a new 24" RCP.
PROJECT NEED:
The current drainage system is old and insufficient to convey peak storm
runoff.
FINANCING:
Purpose
Environmental
Design
Construction
Admin/Inspection
Total Cost =
Estimated Cost
$5,000
$25,000
$50,000
$20,000
$100,000
Funding Source
IRF
IRF
IRF
IRF
CYNTHIA Page 67
II II II II I 1 I I I 1 I I I I
II i i i i i I I \ I t I 1 I I t ! I 1 I I i I i * I t I I
CAPITAL PROJECT DESCRIPTION
DRAINAGE PROJECTS - FARADAY/MELROSE DRAINAGE FACILITIES
PROJECT NAME
1 1 i
3622
PROJECT NO.
PROJECT LOCATION MAP:PROJECT LOCATION:
Within Faraday Avenue at the crossing of the Agua Hedionda Creek tributary
draining the raceway properties.
PROJECT DESCRIPTION:
Construction of a 49 acre foot floodwater retention facility including a reinforced
concrete box culvert beneath Faraday Avenue.
PROJECT NEED:
This project is one of a series of projects designed to help reduce flooding
along the Agua Hedionda Creek especially within the RCMHP community.
The series of projects include the construction of four floodwater retention
basins, including Basin BJ, Basin BJB, the Melrose Drive Basin and
the Faraday Avenue basin, and the dredging and/or improvement of the
Agua Hedionda and Calavera Creek channels.
FINANCING:
Purpose
Design/Construction
Total Cost =
Estimated Cost
$300,000
$300,000
Funding Source
PLDA "B"
Farbasin Page 68
CAPITAL PROJECT DESCRIPTION
DRAINAGE PROJECTS - GABBIANO LANE STORM DRAIN MODIFICATION STUDY
PROJECT NAME
3934
PROJECT NO.
PROJECT LOCATION MAP:
Project
Site
EATIQUITOS LAGOON
PROJECT LOCATION:
Southerly end of Gabbiano Lane.
PROJECT DESCRIPTION:
Study the configuration of the public storm drain outlet and develop a revised
configuration that will enable the adjacent private desiltation basin to drain
entirely.
PROJECT NEED:
The project will identify a permittable project that will reduce the maintenance
cost for both the private and public facilities associated with the storm drain
outlet.
FINANCING:
Purpose
Environmental
Report
Total Cost =
Estimated Cost
$15,000
$20,000
$35,000
Funding Source
Gas Tax
Gas Tax
Gabbiano Page 69
iiiiiiiifiiiiiiiiiiiiiisiitsiifiri • i • i
I i I i i I I 1 t i i I i i I i i i i i t t I i I I I I i i i i I i i i i I
CAPITAL PROJECT DESCRIPTION
6600
DRAINAGE PROJECTS - HIGHLAND DRIVE BETWEEN PINE AVENUE AND BASSWOOD AVENUE PROJECT NO.
PROJECT NAME
PROJECT LOCATION MAP:
PINE AVENUE
ALTERNATIVE
ALIGNMENT
BASSWOOD AVENUE
ALTERNATIVE
ALIGNMENT
PROJECT LOCATION:
West side of Highland Drive between Pine Avenue and Basswood Avenue
PROJECT DESCRIPTION:
Construction of an 18" reinforced concrete storm drain pipe along Highland
Drive from a low point at the mid-block between Pine Avenue and Basswood
Avenue to a point of discharge into an existing drainage channel on either
Pine Avenue or Basswood Avenue. The specific alignment will be determined
after further study and analysis of potential alternative storm drain alignments.
The project will include construction of catch basin, junction structures and pipe
outlet improvements.
PROJECT NEED;
The project is needed to prevent potential flooding of private property
downstream of Highland Drive.
FINANCING:
Purpose
Design
Construction
Admin/Inspection
Total Cost =
Estimated Cost
$25,000
$196,800
$18,200
$240,000
Funding Source
GCC
GCC
GCC
Highland Page 70
CAPITAL PROJECT DESCRIPTION
DRAINAGE PROJECTS - KELLY DRIVE CHANNEL REPAIR
PROJECT NAME
NONE
PROJECT NO.
PROJECT LOCATION MAP:
PARK
PROJECT LOCATION:
Parallel to Kelly Drive east of Hillside Drive and behind the row of homes on the
south side of Kelly Drive.
PROJECT DESCRIPTION:
Reconstruct 260' of a concrete lined trapezoidal channel and 780' of concrete
slope protection.
PROJECT NEED:
This portion of the existing concrete channel lining is breaking apart and the
underlying earth is being eroded. The erosion is undermining the remaining
channel and adjacent property/backyards.
FINANCING:
Purpose
Study/Design
Environmental
Construction
Admin/Inspection
Total Cost =
Estimated Cost
$105,000
$50,000
$680,000
$60,000
$895,000
Funding Source
IRF
IRF
IRF
IRF
KELLY_DR Pa9e 71
• 1 II t I It II II II II li f 1 fl 11 tl II II II II f 1 II
iititliliiiiliiiiiiif!if i 1 if if i i i i
CAPITAL PROJECT DESCRIPTION
DRAINAGE PROJECTS - LA COSTA AVENUE STORM DRAIN REPLACEMENTS
PROJECT NAME
6602
PROJECT NO.
PROJECT LOCATION MAP:PROJECT LOCATION:
Various locations on La Costa Avenue east of El Camino Real.
PROJECT DESCRIPTION:
Replace old corrugated metal storm drains with reinforced concrete pipe at
various locations along La Costa Avenue east of El Camino Real.
PROJECT NEED:
Existing corrugated metal storm drains are in very poor condition and need to
be replaced in order to maintain adequate drainage.
FINANCING:
Purpose
Design
Construction
Admin/Inspection
Total Cost =
Estimated Cost
$50,000
$378,000
$64,150
$492,150
Funding Source
IRF
IRF
IRF
LaCostaSD Page 72
CAPITAL PROJECT DESCRIPTION
DRAINAGE PROJECTS - MASTER DRAINAGE PLAN UPDATE
PROJECT NAME
3872
PROJECT NO.
PROJECT LOCATION MAP:
VARIOUS LOCATIONS OF THE CITY
PROJECT LOCATION:
Throughout the City.
PROJECT DESCRIPTION:
Update the City's Master Drainage Plan (MDP) based on current growth
projections, new Federal storm water quality permit requirements, the City's
Habitat Management Plan (HMP) and construction and environmental
mitigation cost increases. Also included is the cost to prepare and process an
environmental impact report for the updated MDP.
PROJECT NEED:
The MDP update will help identify the need for changes to planned facilities
based on the timing of growth projections and NPDES requirements. The City's
MDP was last updated in 1994. Since 1994, there have been several changes
to the City's growth patterns due to the HMP and HCP that impact growth
projections and densities in various areas of the City. This Master Plan is
necessary for identifying the facilities needed to meet Growth Management
Standards.
FINANCING:
Purpose
Studies/Reports
Total Cost =
Estimated Cost
$454,933
$454,933
Funding Source
PLDA
DRNG MP
Page 73
ii it ii ii ii ii ii ii r i m i ti ii 11 ii ii f i
ii i t II II II i I II II tl II I t tl ii ii ii ii ii
CAPITAL PROJECT DESCRIPTION
DRAINAGE PROJECTS - MISCELLANEOUS MASTER DRAINAGE FACILITIES
PROJECT NAME
NONE
PROJECT NO.
PROJECT LOCATION MAP:
VARIOUS LOCATIONS THROUGHOUT THE CITY
MASTRDRN
PROJECT LOCATION:
Various locations throughout the City.
PROJECT DESCRIPTION:
Construction of various major storm drain facilities within the City. The facilities
funded through this program are outlined in the Master Drainage and Storm
Water Management Plan.
PROJECT NEED:
Required to meet Growth Management Standards and identified in the Master
Drainage and Storm Water Quality Management Plan.
FINANCING:
Purpose
Design/Construction
Total Cost =
Estimated Cost
$10,936,000
$10,936,000
Funding Source
PLDA Fees
Page 74
CAPITAL PROJECT DESCRIPTION
DRAINAGE PROJECTS - MISCELLANEOUS ROAD SUBDRAINS
PROJECT NAME
3681
PROJECT NO.
PROJECT LOCATION MAP:
HWY 78
PROJECT LOCATION:
Nine locations throughout Carlsbad:
1. Carlina & Hataca Road
2. Calavo Court
3. Park Drive & Cove
4. Alicante & Corte Oe La Vista
5. La Costa Avenue & Cadencia
PROJECT DESCRIPTION:
6. Quebrada Circle
7. Linda Lane
8. Avenida Nieve
9. Circulo Adorno
Preparation of an engineering study report investigating the potential causes
and remedies for various surface/subsurface drainage problems occurring at
the various street locations listed above. Repairs will be made to the extent
funding is available. Additional funding requests will be made after more
detailed cost estimates are prepared in the study report.
PROJECT NEED:
Based upon citizen request and maintenance staff requests.
1. Save maintenance dollars
2. Mitigates hazards from slip and falls
3. Relieve health hazards
FINANCING:
Purpose
Design/Construction
Total Cost =
Estimated Cost
$485,000
$485,000
Funding Source
Gas Tax
Misc_drn
i i i i i i i i i i i i i i i i i i i i 0s*
Page 75
i I t 1 II II 11 II § 1
II II II ii it II 11 it I i i iiiiliiiiiiiiiiii
CAPITAL PROJECT DESCRIPTION
DRAINAGE PROJECTS - PARK DRIVE AND TAMARACK AVENUE STORM DRAIN
PROJECT NAME
NONE
PROJECT NO.
PROJECT LOCATION MAP:
u
PROJECT LOCATION:
Along Park Drive from Monroe Street to Tamarack Avenue and along Tamarack
Avenue from Park Drive to James Drive.
PROJECT DESCRIPTION:
Installation of approximately 2,100 linear feet of 24-inch diameter reinforced
concrete storm drain pipe including access holes and other appurtenances.
Identified within the Master Drainage Plan as facility "BCA".
PROJECT NEED:
Required to prevent flooding of properties west of Park Drive and north of
Tamarack Avenue. The development of a proposed new subdivision east of
Park Drive between Tamarack Avenue and Monroe Street will add the existing
drainage and create a greater need for this master planned drainage facility.
FINANCING:
Purpose
Planning/Study
Construction
Total Cost =
Estimated Cost
$100,000
$510,000
$610,000
Funding Source
PLDA"B"
PLDA"B"
Parkjam Page 76
CAPITAL PROJECT DESCRIPTION
DRAINAGE PROJECTS - RIDGECREST DRAINAGE IMPROVEMENT
PROJECT NAME
NONE
PROJECT NO.
PROJECT LOCATION MAP:
VILLAGE
^/PROJECT
SITE
RIDGCRST
II II II II II
PROJECT LOCATION:
3500 block of Ridgecrest Drive.
PROJECT DESCRIPTION:
Replace the existing corroded CMP pipe and undersized inlet in the low spot on
Ridgecrest. A short H&H study will be needed to verify inlet size.
PROJECT NEED:
The existing inlet at the low point in this road clogs during storm events and
causes flooding to the residences below. The affected residents sent letters to
the City documenting the ongoing problem.
FINANCING:
Purpose
Study/Design
Construction
Admin/Inspection
Total Cost =
Estimated Cost
$21,000
$80,500
$16,000
$117,500
Funding Source
GCC
GCC
GCC
I I I 1 I 1 1 1
Page 77
II II ft ft I
i i i I i i i i I i f i i i l I i i i I i i i i i i i I i i
CAPITAL PROJECT DESCRIPTION
DRAINAGE PROJECTS - ROMERIA STREET DRAINAGE IMPROVEMENT
PROJECT NAME
I I
NONE
PROJECT NO.
PROJECT LOCATION MAP:PROJECT LOCATION:
Behind properties on Romeria Street.
PROJECT DESCRIPTION:
Replace approximately 400 linear feet of existing trapezoidal channel and
200 linear feet of tributary ditches. H&H study is recommended to verify
channel size and adequacy of culvert under La Costa Avenue.
PROJECT NEED:
The existing channel is badly damaged with various sinkholes which poses a
safety problem.
FINANCING:
Purpose
Study
Design
Environmental
Construction
Admin/Inspection
Total Cost =
Estimated Cost
$30,000
$20,000
$10,000
$174,000
$40,000
$274,000
Funding Source
GCC
GCC
GCC
ROMERIA Page 78
CAPITAL PROJECT DESCRIPTION
DRAINAGE PROJECTS - TAMARACK AND EL CAMINO REAL
STORM DRAIN AND SILTATION BASIN
PROJECT NAME
NONE
PROJECT NO.
PROJECT LOCATION MAP:
TAMECRSD
• lit
PROJECT LOCATION:
At the southeast corner of Tamarack Avenue and El Camino Real.
PROJECT DESCRIPTION:
Reimbursement for the construction of a 45-inch and 75-inch storm drainage
system together with appurtenant inlets, access holes and outlet structures.
Project also includes the installation of an approximate 32,000 cubic yard
siltation basin. The project facilities are identified as facilities "BF", "BFB" and
Basin "BF1".
PROJECT NEED:
The Robertson Ranch property owners are currently processing a master plan
for development of the Robertson Ranch project including the property at the
southeast corner of Tamarack Avenue and El Camino Real. As a condition of
development, the developer will be required to install the above-described
Master Drainage Plan facilities. The cost of the facilities is expected to exceed
the drainage fee obligation for the project, thus creating the potential need for
reimbursement.
FINANCING:
Purpose
Reimbursement
Total Cost =
Estimated Cost
$1,279,000
$1,279,000
Funding Source
PLDA "B" Fees
Page 79
i ri t i § i i i t i i i f i t i f i
ii ri ri r i ri f i i i i i ri ri ri i i 11 i i i i ri r i r i 11
SEWER PROJECTS
t I I 1 i I I I i I i I i I t i i I i i f i ? . itiiiiiiiiiii
ENCINA WATER POLLUTION CONTROL
FACILITY PROJECTS
FUNDING MATRIX FOR ENCINA WATER POLLUTION CONTROL FACILITY PROJECTS
PROJ
NO.
5800
5801
5803
FUND
NO.
58001
58011
58031
PROJECT TITLE
BUILDING IMPROVEMENTS
CAPITAL ACQ/REPL/REHAB AND STAFFING
PHASE IV EXPANSION - DEBT SERVICE
PHASE V EXPANSION
FUNDING
SOURCE
SEWER REPL
SEWER REPL
SEWER CONN
SEWER CONN
TOTAL
BUDGET
4,099,190
10,577,323
8,391,592
8,262,660
FUTURE YEAR BUDGET AMOUNTS
YEAR1
2006-07
715,057
933,944
YEAR 2
2007-2008
889,670
935,507
YEARS
2008-2009
500,572
937,169
YEAR 4
2009-2010
541,162
933,006
YEARS
2010-2011
500,000
931,418
YEAR 6-10
2011-2016
2,835,206
3,720,548
BUILDOUT
2016-2021
3,470,623
i 3 i i i i i i > i i i i i i i i i i ri • i f i i
Page 80
• 111
l i II i f i i i i t i i i i i § i f l i i :
CAPITAL PROJECT DESCRIPTION
l i i i i I 1 i i
5800
ENCINA WATER POLLUTION CONTROL FACILITY - BUILDING IMPROVEMENTS
PROJECT NAME
PROJECT NO.
PROJECT LOCATION MAP:PROJECT LOCATION:
Encina Water Pollution Control Facility at 6200 Avenida Encinas.
PROJECT DESCRIPTION:
To construct and/or improve existing building facilities at the Encina Water
Pollution Control Facility. Cost represents City's pro-rated share of the building
improvements.
Building improvements include:
• Additional Office
• Employee Locker Facilities
• Expanded Laboratory Facilities
PROJECT NEED:
Needed to provide office and laboratory facilities at the Encina Water Pollution
Control Facility.
FINANCING:
Purpose Estimated Cost Funding Source
Design/Construction $4,099,190 Sewer Replacement
Total Cost = $4,099,190
Page 81
ENCINA-1
CAPITAL PROJECT DESCRIPTION
ENCINA WATER POLLUTION CONTROL FACILITY - CAPITAL ACQUISITIONS
REPLACEMENT/REHABILITATION
PROJECT NAME
5801
PROJECT NO.
PROJECT LOCATION MAP:PROJECT LOCATION:
Encina Water Pollution Control Facility at 6200 Avenida Encinas.
PROJECT DESCRIPTION:
The funds for this project are used by the Encina Water Pollution Control
Facility to develop and construct its buildout Capital Improvement Program.
The cost is Carlsbad's share to cover staff, overhead, and hiring consultants to
design and develop bid specifications for future capital acquisitions and the
replacement / rehabilitation / construction of facilities at the sewer treatment
plant.
PROJECT NEED:
To ensure the efficient and effective operation of Encina Water Pollution
Control Facility.
FINANCING:
Purpose Estimated Cost Funding Source
Design/Construction $10,577,323 Sewer Replacement
Total Cost = $10,577,323
ENCINA-2
ii ii ii ii ii ii ii ii ii ii n
Page 82
I i i I ii II II • i mm
I I i I i I i } i j i i I i j I I i I ', 1 ; i iitiiillilil
CAPITAL PROJECT DESCRIPTION
NONE
ENCINA WATER POLLUTION CONTROL FACILITY - PHASE IV EXPANSION DEBT SERVICE PROJECT NO.
PROJECT NAME
PROJECT LOCATION MAP:PROJECT LOCATION:
South of Palomar Airport Road on the east side of Avenida Encinas.
PROJECT DESCRIPTION:
Expansion of the Encina Water Pollution Control Facility to increase treatment
capacity from 22.5 million gallons per day to 36.0 million gallons per day of raw
sewage. Cost includes bond financing and interest costs.
PROJECT NEED:
Required to meet Growth Management Standards and identified in the Master
Plan of Sewage.
FINANCING:
Purpose
Debt Service
Total Cost =
Estimated Cost Funding Source
$8,391,592 Sewer Connection
$8,391,592
TREATPLT Page 83
CAPITAL PROJECT DESCRIPTION
ENC1NA WATER POLLUTION CONTROL FACILITY - PHASE V EXPANSION
PROJECT NAME
5803
PROJECT NO.
PROJECT LOCATION MAP:
EWPCF-V
• 1 I i
PROJECT LOCATION:
Encina Water Pollution Control Facility at 6200 Avenida Encinas.
PROJECT DESCRIPTION:
Expand the Encina Water Pollution Control Facility to buildout for the treatment
of 45-60 MGD of wastewater. Cost represents City's pro-rated share of the
Phase V expansion.
PROJECT NEED:
To provide for ultimate wastewater treatment capacity of the Carlsbad Sewer
District.
FINANCING:
Purpose Estimated Cost Funding Source
Design/Construction $8,262,660 Sewer Connection
Total Cost = $8,262,660
Page 84
i B i • •i m i ii t i ii • t ii
I J I I I 1 I 1 i i i 1 I j i I i i i I i i . 1 i i i I t I I 1 i I i i
SEWER COLLECTION SYSTEM PROJECTS
FUNDING MATRIX FOR SEWER COLLECTION SYSTEM PROJECTS
PROJ
NO.
5501
3322
3622
3495
3873
3951
5500
3874
3537
3538
3809
3875
3840
3927
3952
3828
5502
3492
3886
3949
3867
3950
FUND
NO.
55011
33221
36224
34951
38731
39511
55001
38741
35371
35381
38091
38751
38401
39271
39521
3828
55021
34921
38861
39491
38671
39501
PROJECT TITLE
AVENIDA ENCINAS GRAVITY SEWER
BUENA INTERCEPTOR SEWER IMPROVEMENTS
BUENA VISTA LIFT STATION
BUENA VISTA LIFT STATION FORCE MAIN
CARLSBAD TRUNK SEWER REACHES VCT1A, VCT1B, VCT1C (SBA"A")
FARADAY AVENUE - ORION TO MELROSE SEWER (SEE CIRCULATION PROJ)
FOREST GRAVITY SEWER
HOME PLANT LIFT STATION REHABILITATION
HOME PLANT - PIPELINE REPLACEMENT
LA COSTA MEADOWS SEWER EXTENSION
LA GOLONDRIA SEWER EXTENSION
NORTH AGUA HEDIONDA INTERCEPTOR REHAB - EAST SEGMENT
NORTH AGUA HEDIONDA INTERCEPTOR - WEST SEGMENT
NORTH AGUA HEDIONDA TRUNK SEWER REACH NAHT1 A
NORTH BATIQUITOS INTERCEPTOR REHABILITATION
NORTH BATIQUITOS SEWAGE LIFT STATION MODIFICATIONS
POINSETTIA SEWAGE LIFT STATION ODOR/NOISE ABATEMENT
SEWER LIFT STATION REMOVALS - GATESHEAD, VILLAS, SIMSBURY, VANCOUVER
SEWER LIFT STATION REPAIRS AND UPGRADES
SEWER LINE REFURBISHMENTS/REPLACEMENT
SEWER MASTER PLAN/CONNECTION FEE UPDATE
SEWER MONITORING PROGRAM
SOUTH AGUA HEDIONDA LIFT STATION AND FORCE MAIN
TERRAMAR LIFT STATION EMERGENCY GENERATOR
VISTA/CARLSBAD INTERCEPTOR AGUA HEDIONDA LIFT STATION (VC12)
VISTA/CARLSBAD INTERCEPTOR REACH VC11B
VISTA/CARLSBAD INTERCEPTOR REACH VC13 TO VC15
VISTA/CARLSBAD INTERCEPTOR REHAB REACHES 1 AND 2
VISTA/CARLSBAD INTERCEPTOR REPLACEMENT REACH 3
FUNDING
SOURCE
SEWER REPL
SEWER REPL
SEWER CONN
SEWER CONN
SEW BENEF
SEWER REPL
SEWER REPL
SEWER REPL
SEWER REPL
SEWER REPL
SEWER REPL
SEWER HEPL
SEWER REPL
SEWER REPL
SEWER REPL
SEWER REPL
SEWER REPL
SEWER REPL
SEWER REPL
SEWER REPL
SEWER REPL
SEWER CONN
SEW BENEF
SEWER REPL
SEWER CONN
SEWER CONN
SEWER CONN
SEWER REPL
SEWER CONN
TOTAL
BUDGET
266,963
2,340,000
632,132
1,440,133
522,167
110,200
900,000
650,000
440,000
286,358
654,000
620,000
4,177,750
1,863,156
1,199,000
647,193
293,800
400,000
1,360,380
5,974,600
354,200
372,000
8,827,415
205,958
9,127,159
3,549,000
13,515,200
830,975
2,688,220
FUTURE YEAR BUDGET AMOUNTS
YEAR1
2006-07
330,000
22,000
YEAR 2
2007-2008
266,963
1,880,000
650,000
76,358
119,474
243,800
400,000
330,000
22,000
180,958
105,269
11,715,200
73,220
YEAR 3
2008-2009
1 ,743,682
80,000
330,000
22,000
7,902,530
523,000
YEAR 4
2009-2010
100,000
330,000
22,000
2,092,000
YEARS
2010-2011
100,000
100,000
330,000
22,000
YEAR 6-10
2011-2016
422,167
500,000
1,650,000
354,200
110,000
BUILDOUT
2016-2021
1,440,133
1,744,600
110,000
lllillllllilllllflllFltl II I I II till
Page 85
• 1 • 1
i i i i t i i i i I i I 1 I 1
CAPITAL PROJECT DESCRIPTION
SEWER COLLECTION SYSTEM - AVENIDA ENCINAS GRAVITY SEWER
PROJECT NAME
3581
PROJECT NO.
PROJECT LOCATION MAP:
PROJECT
AREA
PROJECT LOCATION:
Along north side of Lanakai Mobile Home Park.
PROJECT DESCRIPTION:
Replace approximately 1,000 feet of 8" gravity sewer.
PROJECT NEED:
The existing forcemain releases unacceptable levels of hydroden sulfide gas
resulting in numerous odor complaints and deterioration of the gravity sewer
system.
FINANCING;
Purpose
Design/Admin/lnsp
Construction
Total Cost =
Estimated Cost Funding Source
$61,250
$205,713
$266,963
Sewer Replacement
Sewer Replacement
Avencsew Page 86
CAPITAL PROJECT DESCRIPTION
SEWER COLLECTION SYSTEM - BUENA INTERCEPTOR SEWER IMPROVEMENTS
PROJECT NAME
5501
PROJECT NO.
PROJECT LOCATION MAP:
ROJECT
(BUENA
INTERCEPTOR)
BUENAJNT
ii ii PI K i mm
PROJECT LOCATION:
Buena Interceptor Sewer from El Camino Real to the Encina Wastewater
Treatment Plant.
PROJECT DESCRIPTION:
The Buena Interceptor Sewer conveys wastewater for the cities of Carlsbad
and Vista. The existing system capacity is inadequate for projected future
flows. The project will be mitigated with an alignment and capacity studies with
an alternatives analysis.
PROJECT NEED:
Required to meet future sewer drainage basin flows. Also required pursuant to
the Carlsbad/Buena Sanitation Agreement.
FINANCING:
Purpose
Studies
Design
Environmental
Construction
Admin/Inspection
Total Cost =
Estimated Cost Funding Source
$100,000
$104,000
$80,000
$1,800,000
$256,000
$2,340,000
Sewer Replacement
Sewer Replacement
Sewer Replacement
Sewer Replacement
Sewer Replacement
Page 87
r i t js •• ii ii 11 11 ti i «
I t J i I J I J I 1 I I 1 \ I i i i i ! t I
CAPITAL PROJECT DESCRIPTION
SEWER COLLECTION SYSTEM - BUENA VISTA LIFT STATION & PUMP ADDITION
PROJECT NAME
3322
PROJECT NO.
PROJECT LOCATION MAP:PROJECT LOCATION:
Adjacent to the east side of Jefferson Street just south of Buena Vista Creek.
PROJECT DESCRIPTION:
Upgrade and expand the lift station facility to a capacity of 15.5 million gallons
per day (MGD). Improvements include revision to building to add a second
floor, new control systems, new back-up generator and the addition of one new
pump. Project costs will be shared with the City of Vista. The below stated
cost estimate is Carlsbad's share of the total project cost.
PROJECT NEED:
Needed to meet future demand.
FINANCING;
Purpose Estimated Cost Funding Source
Design/Construction $632,132 Sewer Connect. Fees
Total Cost = $632,132
BUENASTA Page 88
CAPITAL PROJECT DESCRIPTION
SEWER COLLECTION SYSTEM - BUENA VISTA LIFT STATION FORCE MAIN (VC-4)
PROJECT NAME
NONE
PROJECT NO.
PROJECT LOCATION MAP:
Project /'
PROJECT LOCATION:
Along the south shore of the Buena Vista Lagoon between the Buena Vista Lift
Station and 1-5.
PROJECT DESCRIPTION:
Replace existing 16" pipeline with 24" pipeline to provide dual 24" force mains.
PROJECT NEED:
Increase capacity of sewer force main system to accommodate future sewer
generation.
FINANCING:
Purpose
Design
Environmental
Construction
Admin/Inspection
Total Cost =
Estimated Cost Funding Source
$75,000
$125,000
$1,140,133
$100,000
$1,440,133
Sewer Connection Fees
Sewer Connection Fees
Sewer Connection Fees
Sewer Connection Fees
Buenlift
i a i i mm • i • i tci 11 11 11 i i• i r i it m
Page 89
ii 11 • i • i
I i i i i i i I • i I i I i t •: ! ; i : .
CAPITAL PROJECT DESCRIPTION
« I I j
NONE
SEWER COLLECTION SYSTEM - CARLSBAD TRUNK SEWER REACHES VCT1A. VCT1B. VCT1C
PROJECT NAME
PROJECT NO.
PROJECT LOCATION MAP:PROJECT LOCATION:
From Vancouver Street and Simsbury Court within Calavera Hills north to the
Vista Carlsbad Trunkline located adjacent to Highway 78.
PROJECT DESCRIPTION:
Construct 1,000 feet of 8-inch diameter sewer, 2,000 feet of 10-inch diameter
sewer, and 3,000 feet of 12-inch diameter sewer.
PROJECT NEED:
As Calavera Hills developed, several temporary sewage lift stations were
constructed due to a lack of existing facilities downstream of the project sites.
At the time, it was anticipated that the downstream properties would develop in
a timely fashion negating any need for long-term maintenance of the temporary
lift stations. The two listed stations are aging and in need of increased repair
and maintenance. In lieu of expending the additional funds to upgrade
temporary stations, staff is proposing completing the extension of the gravity
lines from the stations to the existing Vista Carlsbad Trunk Line sewer. The lift
stations would then be abandoned and removed.
FINANCING:
Purpose Estimated Cost Funding Source
Land Acquisition
Design
Construction
Total Cost =
$20,000
$80,000
$422,167
$522,167
Sewer Benefit Zone Fee
Sewer Benefit Zone Fee
Sewer Benefit Zone Fee
VCT1ABC
Page 90
CAPITAL PROJECT DESCRIPTION
SEWER COLLECTION SYSTEM - FOREST GRAVITY SEWER
PROJECT NAME
3495
PROJECT NO.
PROJECT LOCATION MAP:
SEWER
ALIGNMENT "A"
Forststa
m:m • • * i • i
PROJECT LOCATION:
Along Forest Avenue at Highland Drive.
PROJECT DESCRIPTION:
Abandon sewage lift station and construct gravity sewer.
PROJECT NEED:
Existing lift station does not meet current electrical and ventilation safety
requirements, and wet well and mechanical equipment need replacement.
Sewer pipeline eliminates need for upgrade of facility.
FINANCING:
Purpose
Design
Construction
Admin/Inspection
Total Cost =
Estimated Cost Funding Source
$100,000
$700,000
$100,000
$900,000
Sewer Replacement
Sewer Replacement
Sewer Replacement
PI ii mm mm mm i i • i
Page 91
1 mm •• 11 II
iiiiillliiiliiii i i i i i i I 1 i i t i i 1 i i i 1
CAPITAL PROJECT DESCRIPTION
SEWER COLLECTION SYSTEM - HOME PLANT LIFT STATION
PROJECT NAME
3873
PROJECT NO.
PROJECT LOCATION MAP:
\
PACIFIC
OCEAN
PROJECT LOCATION:
Home Plant Lift Station near Carlsbad Boulevard and northern City limits.
PROJECT DESCRIPTION:
Replace pumps, upgrade wetwell and manifold piping, relocate wetwell
ventilation system, reconstruct influent sewer manhole, and replace 260 feet of
15-inch gravity sewer pipeline.
PROJECT NEED:
Field review shows that sand accumulating in the wet well is due to undersized
pumps. Installing larger pumps, replacing existing pipeline, and completing the
other upgrades will reduce the maintenance costs at the pump station.
FINANCING:
Purpose
Design
Construction
Admin/Inspection
Total Cost =
Estimated Cost
$50,000
$1,000,000
$40,000
$1,090,000
Funding Source
Sewer Replacement
Sewer Replacement
Sewer Replacement
Homeplnt Page 92
CAPITAL PROJECT DESCRIPTION
SEWER COLLECTION SYSTEM - LA COSTA MEADOWS SEWER EXTENSION
PROJECT NAME
3951
PROJECT NO.
PROJECT LOCATION MAP:PROJECT LOCATION:
In La Costa from the end of Chorlito Street to El Fuerte Street.
PROJECT DESCRIPTION:
Removal of the La Costa Meadows Lift Station and extension of an eight-inch
gravity sewer approximately 600 feet to the new gravity sewer constructed in
El Fuerte Street by the Rancho Carrillo project developer.
PROJECT NEED:
The La Costa Meadows Lift Station was constructed to temporarily divert
sewage flows into existing Leucadia County Water District (LCWD) facilities.
The diversion was required due to a lack of City sewer facilities located
downstream of the La Costa Meadows project within the Rancho Carrillo Valley.
The "diversion" agreement between the City and LCWD required the
abandonment of the lift station and connection to City sewer facilities when the
downstream properties were developed and new sewer facilities extended up
El Fuerte Street. The needed downstream sewer collection facilities were
recently constructed as part of the Rancho Carrillo project.
FINANCING:
Purpose
Design
Construction
Admin/Inspection
Total Cost =
Estimated Cost Funding Source
$25,000
$226,358
$35,000
$286,358
Sewer Replacement
Sewer Replacement
Sewer Replacement
Lcmeadow
I i I ! I
Page 93
II li II VI II II II II II II II II II II VI II
i 1 I 1 I i i i i i i ! i I f I I 1 ; I ; ! ; v , I i i I I
CAPITAL PROJECT DESCRIPTION
i i i 1 i i i i
5500
SEWER COLLECTION SYSTEM - LA GOLONDR1NA SEWER EXTENSION
PROJECT NAME
PROJECT NO.
PROJECT LOCATION MAP:PROJECT LOCATION:
In La Costa from the end of La Golondrina Street north of Poinsettia Lane.
PROJECT DESCRIPTION:
Removal of the La Golondrina Lift Station and extension of an eight-inch
diameter gravity sewer approximately 1,000 feet to the new gravity sewer
constructed in Poinsettia Lane by the Rancho Carrillo project developer. .
PROJECT NEED:
The La Costa Golondrina Lift Station was constructed to temporarily divert
sewage flows into existing Leucadia County Water District (LCWD) facilities.
The diversion was required due to a lack of City sewer facilities located
downstream of the Ponderosa Homes project within the Rancho Carrillo Valley.
The "diversion" agreement between City and LCWD require the abandonment
of the lift station and connection to City sewer facilities when the downstream
properties were developed and new sewer facilities extended up the future
Poinsettia Lane. The needed downstream sewer collection facilities were
recently completed as part of the Rancho Carrillo project.
FINANCING:
Purpose
Planning/Study
Land Acquisition
Environmental
Design
Construction
Admin/Inspection
Total Cost =
Estimated Cost Funding Source
$10,000
$5,000
$25,000
$60,000
$489,000
$65,000
$654,000
Sewer Replacement
Sewer Replacement
Sewer Replacement
Sewer Replacement
Sewer Replacement
Sewer Replacement
La_golon Page 94
CAPITAL PROJECT DESCRIPTION
3874
SEWER COLLECTION SYSTEM - NORTH AGUA HEDIONDA INTERCEPTOR
REHABILITATION - EAST SEGMENT EL CAM IMP REAL TO KELLY DRIVE
PROJECT NAME
PROJECT NO.
PROJECT LOCATION MAP:
Naguaecr
II II * I VI f 1
PROJECT LOCATION:
North bank of Agua Hedionda Lagoon and Creek, from El Camino Real and
Cannon Road intersection to the Kelly Drive/Cove Drive intersection.
PROJECT DESCRIPTION:
• Replace/rehabilitate 21 access holes.
• Conduct environmental survey and prepare documents necessary to
obtain permits.
PROJECT NEED:
Implementation of the project will avoid accidental sewage spill to the lagoon
and creek, and reduce inflow to the sewer.
FINANCING:
Purpose
Environmental/Design
Construction
Total Cost =
Estimated Cost
$9,000
$611,000
$620,000
Funding Source
Sewer Replacement
Sewer Replacement
PI * 1 II II
Page 95
II VI II II II 1 * II
ii li i l ti ii ii ti ti ti fi j i i I i i i t i i l f l
CAPITAL PROJECT DESCRIPTION
SEWER COLLECTION SYSTEM - NORTH AGUA HEDIONDA INTERCEPTOR
REHABILITATION - WEST SEGMENT COVE DRIVE TO HOOVER STREET
PROJECT NAME
3537
PROJECT NO.
PROJECT LOCATION MAP:PROJECT LOCATION:
North bank of Agua Hedionda Lagoon and Creek, from Cove Drive to
Hoover Street.
PROJECT DESCRIPTION:
Design and construct access road and shoreline protection wall to
facilitate gravity sewer maintenance from Cove Drive to Hoover Street.
Design and construct erosion protection for access road and existing
gravity sewer where needed.
Replace 700 linear feet of 24-inch diameter sewerline.
Replace/rehabilitate 19 access holes.
Conduct environmental survey and prepare Environmental Impact
Report necessary to obtain permits.
• Design and construct mitigation site.
PROJECT NEED:
Implementation of the project will avoid accidental sewage spill to the lagoon
and creek, reduce inflow to the sewer, and allow for maintenance vehicles to
access the sewer.
FINANCING:
Purpose
Study
Environmental
Property Acquisition
Design
Construction
Estimated Cost
$24,599
$829,808
$45,000
$199,916
$3,078,427
Funding Source
Sewer Replacement
Sewer Replacement
Sewer Replacement
Sewer Replacement
Sewer Replacement
Total Cost = $4,177,750
Annual Operating Cost = $5,000
Page 96
NAI_west
CAPITAL PROJECT DESCRIPTION
NONE
SEWER COLLECTION SYSTEM - NORTH AGUA HEDIONDA TRUNK SEWER REACH NAHT1A
PROJECT NAME
PROJECT NO.
PROJECT LOCATION MAP:
NAHT1A
I I II II • 1 f 1 » • • 1
PROJECT LOCATION:
Along the north side of Tamarack Avenue from El Camino Real to Calavera
Hills Treatment Plant.
PROJECT DESCRIPTION:
Remove existing forcemain and construct 5,000 feet of 8-inch diameter gravity
sewer pipeline.
PROJECT NEED:
When the Calavera Hills Sewer Treatment Plant was initially constructed, there
was no provision for extending a gravity sewer line downstream of the plant.
When the decision was made not to activate the plant, the sewer mains
discharging into the plant site were connected to force main pipe which was
originally intended to carry flow up to the plant from projects located
downstream of the plant. The existing force main is not sloped properly to
handle gravity flow and lacks the necessary access holes for proper
maintenance. Removal of the existing force main and construction of a new
gravity line will complete this portion of the Sewer Master Plan.
FINANCING:
Purpose
Planning/Study
Design
Construction
Admin/Inspection
Total Cost =
Estimated Cost Funding Source
$58,000
$100,000
$1,605,156
$100,000
$1,863,156
Sewer Replacement
Sewer Replacement
Sewer Replacement
Sewer Replacement
11 *" •Bl
Page 97
* V 1 f I
i i i i i i iiiliiilililiii! iti
CAPITAL PROJECT DESCRIPTION
ii 11 11 i i ii
3538
SEWER COLLECTION SYSTEM - NORTH BATIQUITOS INTERCEPTOR REHABILITATION
PROJECT NAME
PROJECT NO.
PROJECT LOCATION MAP:PROJECT LOCATION:
North side of Batiquitos Lagoon from El Camino Real west to North Batiquitos
Lift Station.
PROJECT DESCRIPTION:
During high rainfall periods, the Batiquitos Lagoon level rises to flood above the
existing access road and access hole covers. The project will design a new
access road to the sewer and raise access hole covers to a higher elevation
where required.
PROJECT NEED:
To avoid accidental sewage spill, reduce inflow to the sewer, and allow for
maintenance vehicles to access the sewer.
FINANCING:
Purpose Estimated Cost Funding Source
Design
Environmental
Land Acquisition
Construction
Admin/Inspection
Total Cost =
$270,000
$80,000
$30,000
$719,000
$100,000
$1,199,000
Sewer Replacement
Sewer Replacement
Sewer Replacement
Sewer Replacement
Sewer Replacement
Page 98
Nbatint
CAPITAL PROJECT DESCRIPTION
3809
SEWER COLLECTION SYSTEM - NORTH BATIQUITOS SEWAGE LIFT STATION MODIFICATIONS
PROJECT NAME
PROJECT NO.
PROJECT LOCATION MAP:
PROJECT
SITE
PROJECT LOCATION:
End of Gabbiano Lane.
PROJECT DESCRIPTION:
Replace miscellaneous equipment damaged by corrosion. Provide structural
modifications to dry well and wet well. Modify mechanical and electrical
systems as needed to eliminate failures. Provide color study and necessary
HVAC and odor control modifications.
PROJECT NEED:
Existing structure does not allow wet well to be cleaned out. Existing structure
needs openings to allow lift station pumps to be removed. Existing electrical
system needs to be modified to stop pumps from locking out unnecessarily.
FINANCING:
Purpose
Design
Construction
Admin/Inspection
Total Cost =
Estimated Cost Funding Source
$124,880
$469,313
$53,000
$647,193
Sewer Replacement
Sewer Replacement
Sewer Replacement
Northbat
ii ii ii ii ii ii ii ii ii n
Page 99
mm w § i ii ti ii ii ei
: i i I l i
CAPITAL PROJECT DESCRIPTION
3875
SEWER COLLECTION SYSTEM - POINSETTIA SEWAGE LIFT STATION ODOR AND NOISE ABATEMENT
PROJECT NAME
PROJECT NO.
PROJECT LOCATION MAP:PROJECT LOCATION:
2425 Poinsettia Lane - Poinsettia Sewage Lift Station.
PROJECT DESCRIPTION:
Installation of an activated carbon adsorption odor control system, including
ducting, to treat foul air from the lift station wetwell to reduce corrosion and
control odor emissions, and sound enclosures for outdoor fans.
PROJECT NEED:
The existing lift station emits odors that can reach future developments in close
proximity to the lift station. In addition, uncovered supply and exhaust fans
generate noise that reach or exceed 60 dBa at the fenceline. Control of the
odors and reduction of noise will promote "good neighbor" policy and a higher
level of service to adjacent residents.
FINANCING:
Purpose Estimated Cost
Environmental $6,000
Design $15,700
Construction $227,100
Admin/Inspection $45,000
Total Cost = $293,800
Annual Operating Cost = $11,000
Funding Source
Sewer Replacement
Sewer Replacement
Sewer Replacement
Sewer Replacement
Poinlift Page 100
CAPITAL PROJECT DESCRIPTION
SEWER COLLECTION SYSTEM - SEWER LIFT STATION REMOVALS
PROJECT NAME
NONE
PROJECT NO.
PROJECT LOCATION MAP:
VANCOUVER
Rem_lift2
wm ri
PROJECT LOCATION:
• Vancouver
• Simsbury
• Villas
• Gateshead
PROJECT DESCRIPTION:
Remove existing lift stations and construct new gravity sewer.
PROJECT NEED:
Identified in 2003 Sewer Master Plan Update. Removal of lift stations will
reduce maintenance and operation costs.
FINANCING:
Purpose
Design/Admin/lnsp
Construction
Total Cost =
Estimated Cost Funding Source
$100,000
$300,000
$400,000
Sewer Replacement
Sewer Replacement
t t
Page 1013
t i 11 t i 11 it ii 11 11 it ii ii vi * i vi vi
t i i i i 1 i i i 1 i 1 i i i i i i I t i i i it i i i
CAPITAL PROJECT DESCRIPTION
3840
SEWER COLLECTION SYSTEM - SEWER LIFT STATION - MISCELLANEOUS REPAIRS & UPGRADES
PROJECT NAME
PROJECT NO.
PROJECT LOCATION MAP:PROJECT LOCATION:
Villas, Terramar and Gateshead sewer lift stations.
PROJECT DESCRIPTION:
Repair and upgrade various sewer lift stations throughout the City. Repairs
include replacing existing malfunctioning alarm dialers at the Home Plant and
Villas Sewer Lift Stations; replacing old pumps at the Terramar, Villas and
Gateshead Sewer Lift Stations; replacing existing gas monitoring units, and the
wet well lining at the Villas Sewer Lift Station.
PROJECT NEED:
These projects are needed to properly maintain the existing sewer lift stations
and prevent potential sewage spills. Many of the existing stations are 15 years
or older and require periodic upgrades and/or replacement of pumps and
electrical systems to increased maintenance costs.
FINANCING:
Purpose Estimated Cost Funding Source
Design
Construction
Admin/Inspection
Total Cost =
$40,000
$1,275,380
$45,000
$1,360,380
Sewer Replacement
Sewer Replacement
Sewer Replacement
Sewerlft Page 102
CAPITAL PROJECT DESCRIPTION
SEWER COLLECTION SYSTEM - SEWER LINE REFURBISHMENT/REPLACEMENT
PROJECT NAME
3927 & 5503
PROJECT NO.
PROJECT LOCATION MAP:
VARIOUS LOCATIONS THROUGHOUT THE CITY
SEWERLNE
iiiiii
PROJECT LOCATION:
Various locations within the City sewer limits.
PROJECT DESCRIPTION:
Clean and refurbish existing sewer lines older than 30 years or replace if not
able to refurbish. The sewer lines needing repair will be determined by yearly
TV inspection.
PROJECT NEED:
Maintain system in good condition to avoid major problems.
FINANCING:
Purpose Estimated Cost Funding Source
Design/Construction $5,974,600 Sewer Replacement
Total Cost = $5,974,600
iiiiiiiiiiiiii r
Page 103
ii ii it vi t i ii ii
i I II i i i i i i t f t I i < t i i i t
CAPITAL PROJECT DESCRIPTION
SEWER COLLECTION SYSTEM - MASTER PLAN/CONNECTION FEE UPDATE
PROJECT NAME
i I i i i I
NONE
PROJECT NO.
PROJECT LOCATION MAP:
LOCATIONS THROUGHOUT THE CITY
Mstrplan
PROJECT LOCATION:
Throughout the City.
PROJECT DESCRIPTION:
Update the City's 2003 Sewer Master Plan based on anticipated growth
projections.
PROJECT NEED:
The Master Plan update will help identify the need for changes to planned
facilities based on the timing of growth projections and Growth Management
Standards.
FINANCING:
Purpose
Report/Admin
Total Cost =
Estimated Cost Funding Source
$354,200 Sewer Replacement
$354,200
Page 104
CAPITAL PROJECT DESCRIPTION
SEWER COLLECTION SYSTEM - SEWER MONITORING PROGRAM
PROJECT NAME
3952 & 5504
PROJECT NO.
PROJECT LOCATION MAP:
N/A
PROJECT LOCATION:
Citywide within the City's sewer service area.
PROJECT DESCRIPTION:
Monitor sewer flows and remaining capacities in lines and pump stations within
the Carlsbad sewer service area. Perform sewer flow measurements when
required. Update Sewer Master Plan and review adequacy of sewer fees as
required.
PROJECT NEED:
To ensure that sewer flows do not exceed line capacity and to ensure timely
upgrades of sewer systems in conformance with the Growth Management
Standards.
FINANCING:
Purpose
Monitoring
Total Cost =
Estimated Cost Funding Source
$372,000 Sewer Connection
$372,000
SEWERMON
I 1 I 1 1 1 I 1 I I I I I 1 I I I 1
Page 105
t i ii t i ii t i
litiiititifitliitliiEi 1 I I i 1 I j i i
CAPITAL PROJECT DESCRIPTION
SEWER COLLECTION SYSTEM - SOUTH AGUA HEDIONDA LIFT STATION AND FORCE MAIN
PROJECT NAME
3583 & 3828
PROJECT NO.
PROJECT LOCATION MAP:PROJECT LOCATION:
Along Cannon Road from Armada Drive to El Camino Real.
PROJECT DESCRIPTION:
Construct 350 HP sewage lift station and force main in Cannon Road Reaches
SAH1.SAH2, andSAHS.
PROJECT NEED:
To provide sewer service to those areas generally tributary to the south side of
Agua Hedionda Lagoon.
FINANCING:
Purpose Estimated Cost Funding Source
Planning, Permitting & Design $1,500,000 Sewer Benefit Area Fee
Construction $7,327,415 Sewer Benefit Area Fee
Total Cost = $8,827,415
Annual Operating Cost = $435,000
SOAGPHII
Page 106
CAPITAL PROJECT DESCRIPTION
SEWER COLLECTION SYSTEM - TERRAMAR LIFT STATION EMERGENCY GENERATOR
PROJECT NAME
5502
PROJECT NO.
PROJECT LOCATION MAP:
TERRAMAR LIFT STATION
TERRAMAR
1111
PROJECT LOCATION:
The existing lift station is located approximately 500 feet west of the railroad
right-of-way on the north side of Cannon Road.
PROJECT DESCRIPTION:
Construct approximately 500 linear feet of sewer pipeline from the lift station to
the Vista/Carlsbad interceptor or install a standby generator.
PROJECT NEED:
Currently, the Terramar Lift Station has no redundancy for electric power
outages. Staff responds by bringing a portable generator to the site. Installation
of an emergency overflow pipe system or emergency generator will diminish
risk of sewer spills.
FINANCING:
Purpose
Design/Studies
Construction
Admin/Inspection
Total Cost =
Estimated Cost
$20,200
$161,758
$24,000
$205,958
Funding Source
Sewer Replacement
Sewer Replacement
Sewer Replacement
II II II II II II II ft
Page 107
ii ii t f r i vi r i t i 11
i § i i i I I i t i 1 i i i i : i
CAPITAL PROJECT DESCRIPTION
SEWER COLLECTION SYSTEM - VISTA/CARLSBAD INTERCEPTOR
AGUA HEDIONDA LIFT STATION (VC 12)
PROJECT NAME
i i if II i 1
3492
PROJECT NO.
PROJECT LOCATION MAP:PROJECT LOCATION:
On the south shore of Agua Hedionda Lagoon adjacent to the east side of the
railroad tracks.
PROJECT DESCRIPTION:
Upgrade existing pump station to increase capacity for buildout conditions.
Replace existing pumps with larger capacity pumps and associated
appurtenances. Carlsbad shares the total cost of the project with the City of
Vista at a 50/50% share.
PROJECT NEED:
Required to handle sewage flows for buildout population.
FINANCING:
Purpose
Environmental
Design
Construction
Estimated Cost Funding Source
$508,800
$610,600
$8,007,759
Sewer Connection Fee
Sewer Connection Fee
Sewer Connection Fee
Total Cost = $9,127,159
includes Vista's share of costs.
Annual Operating Cost = $149,000
Agualift
Page 108
CAPITAL PROJECT DESCRIPTION
3886
SEWER COLLECTION SYSTEM - VISTA/CARLSBAD INTERCEPTOR SEWER REACH VC11B
PROJECT NAME
PROJECT NO.
PROJECT LOCATION MAP:
PACIFIC
OCEAN
EKCINA HATER
POLLUTICK COHTROl
FACILITY
SEWVC11B
• 1 PI VI
PROJECT LOCATION:
Along NCTD railroad right-of-way from Olive Avenue south across Agua
Hedionda Lagoon to the Agua Hedionda Lift Station.
PROJECT DESCRIPTION:
Replace existing Vista/Carlsbad Interceptor Sewer Reach VC11B and bridge
(wood trestle) with 800 feet of 54-inch pipeline and a new concrete bridge.
Project cost is shared with the City of Vista.
PROJECT NEED:
Required to handle buildout flows by replacing existing pipeline and the wood
bridge.
FINANCING:
Purpose
Environmental
Design
Property Acquisition
Construction
Total Cost =
Estimated Cost Funding Source
$100,000
$200,000
$14,000
$3,235,000
$3,549,000
Sewer Connection Fee
Sewer Connection Fee
Sewer Connection Fee
Sewer Connection Fee
*Cost includes Vista's share of costs.
Annual Operating Cost = $568
Page 109
VI VP1 ff 1 VI tl II 11 II VI VI
1 1 I i i i i i I i I
CAPITAL PROJECT DESCRIPTION
SEWER COLLECTION SYSTEM - VISTA/CARLSBAD INTERCEPTOR SEWER REACHES VC13 TO VC15
PROJECT NAME
3949
PROJECT NO.
PROJECT LOCATION MAP:
PACIFIC
OCEJN
PROJECT
ENCINA HATER
POLLUTION CONTROL
FACILITY
PROJECT LOCATION:
From the Agua Hedionda Lift Station south to the Encina Water Pollution
Control Facility.
PROJECT DESCRIPTION:
Replace existing Vista/Carlsbad Interceptor Sewer Reaches VC13 to VC15
with a 54" pipeline. Project cost is shared with the City of Vista.
PROJECT NEED:
Required to handle buildout flows and deteriorated pipelines.
FINANCING:
Purpose Estimated Cost Funding Source
Design
Construction
Total Cost =
$700,000
$12,815,200
$13,515,200 *
Sewer Connection Fees
Sewer Connection Fees
*Cost includes Vista's share.
VC13VC15 Page 110
CAPITAL PROJECT DESCRIPTION
SEWER COLLECTION SYSTEM - VISTA/CARLSBAD INTERCEPTOR SEWER
REHABILITATION REACHES 1 THRU 3
PROJECT NAME
3867 & 3950
PROJECT NO.
PROJECT LOCATION MAP:
VCinterc
ii ii ii ii ii ii ii • •
PROJECT LOCATION:
Reaches 1, 2 and 3 of the Vista/Carlsbad Interceptor Sewer located south of
Highway 78 from Jefferson Street to the City limits.
PROJECT DESCRIPTION:
Reaches 1, 2 and 3 of the Vista/Carlsbad (V/C) 36" Ductile Iron Interceptor and
manholes have corroded significantly. VC1 and 2 will be lined with PVC and
manholes will be rehabilitated. VC3 will be completely replaced. V/C interceptor
is jointly owned by the City of Vista and the City of Carlsbad. Through a joint
City agreement, Carlsbad is responsible for 15% of the cost for maintenance
and improvements to Reaches 1, 2 and 3. The City of Vista is responsible for
managing projects within these reaches. Costs below reflect the City of
Carlsbad's share of project.
PROJECT NEED:
Increase safety: Pipeline and manholes have been determined to be
in poor condition. Risk of pipeline failure and sewage spill in
environmentally sensitive area exists.
Unmet needs: Manholes are currently unlined. Concrete is exposed to
hydrogen sulfide environment. Lining will increase longevity of the
manhole. Lining of pipeline will reduce ground water infiltration into the
wastewater system.
FINANCING:
Purpose
Design/Construction
Construction
Estimated Cost Funding Source
$830,975
$2,688,200
Sewer Replacement
Sewer Connection
Total Cost = $3,519,175*
*Cost includes Administration and Inspection costs.
* i mm mm
Page 111
1 II II f I II 1 I
ii ii r i 11 fi 11 ii ii ii ii r i r i i i 11 11 11 r i ri ri
WA TER PROJECTS
i i II I J i i I I i i
WATER DISTRIBUTION SYSTEM PROJECTS
FUNDING MATRIX FOR WATER DISTRIBUTION SYSTEM PROJECTS
PRO)
NO.
3842
5000
3892
5001
3954
3932
3376
3376
3955
5003
5002
3446
3844
3843
3911
3912
3816
3913
3900
3622
3903
3821
3904
3823
3822
3531
FUND
NO.
38421
50001
38921
50011
39541
39321
33762
33761
39551
50031
50021
34461
38441
38431
39111
39121
38161
39131
39001
36223
39031
38211
39041
38231
38221
35311
PROJECT TITLE
AVIARA PARKWAY AT PLUM TREE
CALAVERA HILLS WATER BOOSTER STATION STANDBY GENERATOR
CANNON ROAD EAST OF EL CAMINO REAL - Reimb
CARLSBAD BOULEVARD - SOUTH OF AVENIDA ENCINAS
COLLEGE BOULEVARD - CANNON RD TO CARLSBAD VILLAGE DR - Reimb
COLLEGE BOULEVARD - CANNON TO BADGER LANE
COLLEGE BOULEVARD (ECR TO CANNON ROAD) - Reimb
COLLEGE BOULEVARD- MAERKLE RESERVOIR TO AQUA HEDIONDA CREEK
CRESTVIEW DRIVE TRANSMISSION MAIN
"D" RESERVOIR - BLACK RAIL ROAD IMPROVEMENTS
"D" RESERVOIR IMPROVEMENTS
"D" RESERVOIR - PHASE II
"D" RESERVOIR - PHASE II
DEMOLITION OF WATER FACILITIES AT PAJAMA DRIVE
DESALINATION GROUNDWATER/SEAWATER STUDY
EL CAMINO REAL BETWEEN COLLEGE AND JACKSPAR
EL CAMINO REAL CROSSING AT KELLY DRIVE
EL CAMINO REAL - PALOMAR AIRPORT ROAD SOUTH
EL CAMINO REAL TRANSMISSION MAIN - LISA STREET TO KELLY DRIVE
EL CAMINO REAL TRANSMISSION MAIN FROM FARADAY TO COUGAR DRIVE
EL CAMINO REAL/CARLSBAD VILL DR PIPELINE REPL.
EL FUERTE - NORTH OF LOKER - Reimb
EL FUERTE - ALGA ROAD TO POINSETTIA LANE - Reimb
EL FUERTE - POINSETTIA LANE TO PALOMAR AIRPORT ROAD - Reimb
EL FUERTE AND CORINTIA STREET
ELLERY WATER PUMP PROJECT
FARADAY AVENUE - ORION TO MELROSE WATERLINE - Reimb (CIRCULATION)
FARADAY AVENUE EXTENSION - Reimb
FOUSSAT ROAD WELL ABANDONMENT
LAKE CALAVERA RESERVOIR IMPROVEMENTS
MAERKLE PUMP STATION IMPROVEMENTS
MAERKLE PUMP STATION IMPROVEMENTS
MAERKLE RESERVOIR STORAGE (TAP #2)
MARRON ROAD - PRESSURE REGULATING STATION TO OCEANSIDE
MASTER PLAN UPDATE
MELROSE DRIVE - PALOMAR AIRPORT ROAD TO FARADAY - Reimb
MISCELLANEOUS PIPELINE REPLACEMENT PROJECTS
MISCELLANEOUS STORAGE TANK REPAIRS
MISCELLANEOUS WATER RESERVOIR FENCING
OCEANSIDE INTERTIE UPGRADE
FUNDING
SOURCE
WATER REPL
WATER CONN
WATER CONN
WATER REPL
WATER CONN
WATER CONN
WATER CONN
WATER REPL
WATER REPL
WATER REPL
WATER REPL
WATER CONN
WATER REPL
WATER REPL
WATER REPL
WATER CONN
WATER CONN
WATER REPL
WATER CONN
WATER REPL
WATER REPL
WATER CONN
WATER CONN
WATER CONN
WATER REPL
WATER REPL
WATER CONN
WATER CONN
WATER REPL
WATER REPL
WATER CONN
WATER CONN
WATER CONN
WATER CONN
WATER REPL
WATER REPL
WATER REPL
WATER REPL
TOTAL
BUDGET
459,612
468,817
760,800
886,171
700,000
746,949
487,436
3,758,520
150,519
367,000
156,000
5,978,099
1 ,992,630
60,000
719,260
691,600
104,000
3,225,000
470,000
774,100
65,000
148,750
2,000,000
1,141,000
156,272
60,900
97,210
749,773
202,500
3,767,273
747,100
747,100
13,284,514
715,464
47,800
796,300
1,847,051
161,000
120,399
110,70(
FUTURE YEAR BUDGET AMOUNTS
YEAR1
2006-07
54,425
54,425
YEAR 2
2007-2008
376,560
549,673
418,40(
YEAR 3
2008-2009
52,300
487,436
2,886,960
749,773
796,300
428,651
110,700
YEAR 4
2009-2010
459,612
416,517
886,171
746,949
31,380
156,272
13,284,514
YEARS
2010-2011
119,139
YEAR 6-10
2011-2016
5,978,099
1,992,630
719,260
692,675
692,675
47,800
BUILDOUT
2016-2021
715,464
if 1 ii ii ii ii it ii ii i i M m i PI mm
Page 112
* I •! • I
i i i i t i t i t i i i i i i i E i t i
FUNDING MATRIX FOR WATER DISTRIBUTION SYSTEM PROJECTS
PROJ
NO.
3910
3910
3878
3858
3923
3956
3915
3853
3664
FUND
NO.
39102
39101
38781
38581
39231
39561
39151
38531
36641
PROJECT TITLE
PAR/ECR PUMP STATION
PAR/ECR PUMP STATION
POINSETTIA LANE - EL CAMINO REAL TO SKIMMER CT (Reimb)
POINSETTIA LANE - SKIMMER CT TO CASSIA
POINSETTIA LANE - SKIMMER CT TO CASSIA
POINSETTIA LANE EAST OF BLACK RAIL ROAD
POINSETTIA LANE EAST OF BLACK RAIL ROAD
PRESSURE REDUCING STATION - SYCAMORE CREEK
PRESSURE REGULATING STATION - CANNON AND COLLEGE - Reimb
RANCHO CARRILLO OVERSIZING/EXTENSION
RANCHO SANTA FE RD PIPELINE REPLACEMENT
SAN MARCOS BOULEVARD WEST OF SDCWA
TANGLEWOOD PRESSURE REDUCING STATION REPLACEMENT
TAP RESERVOIR EXTERIOR PAINTING
WATER SYSTEM INTERTIE CONNECTION
FUNDING
SOURCE
WATER CONN
WATER REPL
WATER CONN
WATER REPL
WATER CONN
WATER CONN
WATER REPL
WATER CONN
WATER CONN
WATER CONN
WATER REPL
WATER REPL
WATER REPL
WATER REPL
WATER REPL
TOTAL
BUDGET
997,350
990.350
235,141
456,161
357,732
214,953
214,848
117,257
250,000
93,700
773,000
3,091,241
332,000
132,700
439,000
FUTURE YEAR BUDGET AMOUNTS
YEAR1
2006-07
YEAR 2
2007-2008
YEAR 3
2008-2009
YEAR 4
2009-2010
YEARS
2010-2011
YEAR 6-10
2011-2016
235,141
456,161
357,732
214,953
214,848
117,257
BUILDOUT
2016-2021
Page 113
CAPITAL PROJECT DESCRIPTION
WATER DISTRIBUTION SYSTEM - AVIARA PARKWAY
PROJECT NAME
PROJECT LOCATION MAP;
PROJECT NO.
#19
PROJECT LOCATION:
Aviara Parkway at Plum Tree, north to Mariposa Street, then east to Sapphire
Drive.
PROJECT DESCRIPTION:
Construct 3,100 feet of 8-inch watermain.
PROJECT NEED:
Provide redundant supply to residential development.
FINANCING:
Purpose Estimated Cost Funding Source
Construction
Adm/Design/lnsp
Total Cost =
$362,612
$97,000
$459,612
Water Replacement
Water Replacement
Aviara
II II II II i ii ii ii ii r i 11
Page 114
1 II II fl II II
i I i 1 i i i i 1 i i I I i i 1 1 1 t i i i
CAPITAL PROJECT DESCRIPTION
WATER DISTRIBUTION SYSTEM - CALAVERA HILLS WATER BOOSTER STATION
STANDBY GENERATOR
PROJECT NAME
3842
PROJECT LOCATION MAP:
L
LAKE
CALAVERA
PROJECT
SITE
PROJECT NO.
#37
PROJECT LOCATION:
College Boulevard at Carlsbad Village Drive.
PROJECT DESCRIPTION:
Furnish and install standby generator and generator building at Calavera Hills
Booster Pump Station.
PROJECT NEED:
The existing booster station at this location does not have backup power. If an
electrical power outage occurs, the pump station will not operate. The addition
of a permanent generator at this facility will increase reliability in accordance
with Council goals.
FINANCING:
Purpose
Design/Adm/lnsp
Construction
Total Cost =
Estimated Cost Funding Source
$105,000
$363,817
$468,817
Water Connection
Water Connection
Calhills
Page 115
CAPITAL PROJECT DESCRIPTION
5000
WATER DISTRIBUTION SYSTEM - CANNON ROAD EAST OF EL CAMINO REAL
PROJECT NAME
PROJECT LOCATION MAP:
PROJECT NO.
#9
PROJECT LOCATION:
In Cannon Road from Merwin Drive east to intersection with College Boulevard.
PROJECT DESCRIPTION:
Construct 4,400 feet of 12-inch watermain.
PROJECT NEED:
Provides water supply for new development and creates 375 Zone loop east of
El Camino Real.
FINANCING:
Purpose
Construction
Adm/Design/lnsp
Total Cost =
Estimated Cost Funding Source
$585,800
$175,000
$760,800
Water Connection
Water Connection
Cannon2
ii fi !i fi II II II II II Pi
Page 116
1 II Ii II II II ii t I
i i i 1 i a i i i 1 i 1 i i i 1 i 1 t f i i !
CAPITAL PROJECT DESCRIPTION
WATER DISTRIBUTION SYSTEM - CARLSBAD BOULEVARD SOUTH OF AVENIDA ENCINAS PROJECT NO.
PROJECT NAME
PROJECT LOCATION MAP:
#22
PROJECT LOCATION:
Carlsbad Boulevard from Avenida Encinas south to District boundary.
PROJECT DESCRIPTION:
Construct 4,900 feet of 12-inch watermain.
PROJECT NEED:
Provides a two-way emergency connection with San Diego Water District
240 Zone. Can also supply water to 318 Zone west of I-5.
FINANCING:
Purpose
Construction
Adm/Design/lnsp
Total Cost =
Estimated Cost Funding Source
$686,171
$200,000
$886,171
Water Replacement
Water Replacement
Cbadblv2 Page 117
CAPITAL PROJECT DESCRIPTION
3892
WATER DISTRIBUTION SYSTEM - COLLEGE BOULEVARD FROM CANNON ROAD TO
CARLSBAD VILLAGE DRIVE
PROJECT NAME
PROJECT NO.
PROJECT LOCATION MAP:
LAKE
CALAVERA
PROJECT LOCATION:
College Boulevard from future Cannon Road to Carlsbad Village Drive.
PROJECT DESCRIPTION:
Install 6,330 linear feet of 16-inch line and a pressure regulating station.
(In 490-446 H.G Zone)
PROJECT NEED:
To meet the future demands of the area by increasing supply capacity to 446
Zone from Maerkle Reservoir.
FINANCING:
Purpose Estimated Cost Funding Source
Design/Construction $700,000 Water Connection Fee
Total Cost = $700,000
COLLEGES
i i i i i i f i i i i i i i i i i i ri ii ii f i t
Page 118
• I * •
i i i f i f i i i i f i i I i i
CAPITAL PROJECT DESCRIPTION
WATER DISTRIBUTION SYSTEM - COLLEGE BOULEVARD - CANNON ROAD TO BADGER LANE PROJECT NO.
PROJECT NAME
PROJECT LOCATION MAP:
'PROJECT
#8
PROJECT LOCATION:
College Boulevard from Cannon Road south to Badger Lane.
PROJECT DESCRIPTION:
Construct 4,130 feet of 12-inch watermain.
PROJECT NEED:
Provides water supply for new development and creates 375 Zone loop east of
El Camino Real.
FINANCING:
Purpose
Construction
Adm/Design/lnsp
Total Cost =
Estimated Cost Funding Source
$601,749 Water Connection
$145,200 Water Connection
$746,949
College
Page 119
CAPITAL PROJECT DESCRIPTION
WATER DISTRIBUTION SYSTEM - COLLEGE BOULEVARD (ECR TO CANNON ROAD)
PROJECT NAME
NONE
PROJECT LOCATION MAP:
LAKE
CALAVERA
Colleges
i PI
PROJECT NO.
#7
PROJECT LOCATION:
College Boulevard from 400" north of El Camino Real northerly to future
Cannon Road.
PROJECT DESCRIPTION:
Install 4,000 LF of 16-inch line.
(In 490 H.G Zone)
PROJECT NEED:
To meet the future demands of the area from LFMP Zones 14 and 15.
Developer to pay 50% of cost.
FINANCING:
Purpose Estimated Cost Funding Source
Design/Construction $487,436 Water Connection Fee
Design/Construction $487,436 * Other - Developer
Total Cost =$974,872
*Developer cost not shown in CIP schedules.
i ii ii ti ii ii fi » t mm • i
Pa9e 12°
i f i 11 ii ii fi vi
if li i i i l i i i i i l i l l t l i l i )i j i l i i if i i l i
CAPITAL PROJECT DESCRIPTION
WATER DISTRIBUTION SYSTEM - COLLEGE BOULEVARD MAERKLE RESERVOIR TO
AGUA HEDiONDA CREEK
PROJECT NAME
5001
PROJECT LOCATION MAP:
FARADAY
PROJECT NO.
#10
PROJECT LOCATION;
From Maerkle Reservoir west to the future extension of College Boulevard.
PROJECT DESCRIPTION:
Install 9,300 LF of 36-inch waterline.
(In 490 H.G. Zone).
PROJECT NEED:
Increase supply from Maerkle Reservoir and provide redundant supply pipeline.
Supply to new 490 Zone development east of El Camino Real.
FINANCING:
Purpose
Design/Adm/lnsp
Construction
Total Cost =
Estimated Cost
$662,100
$3,096,420
$3,758,520
Funding Source
Water Replacement
Water Replacement
Maerkle2 Page 121
CAPITAL PROJECT DESCRIPTION
WATER DISTRIBUTION SYSTEM - CRESTVIEW DRIVE TRANSMISSION MAIN
PROJECT NAME
NONE
PROJECT NO.
PROJECT LOCATION MAP:
No_agua
PROJECT LOCATION:
Crestview Drive west of El Camino Real.
PROJECT DESCRIPTION:
Construct 600 feet of 8-inch diameter pipeline.
PROJECT NEED:
To provide a redundant water supply to existing residential area.
FINANCING:
Estimated Cost Funding SourcePurpose
Design
Construction
Total Cost =
$30,000
$120,519
$150,519
Water Replacement
Water Replacement
Page 122
II II II II II II II II II II II II II II II II II II II
li i i i 1 i i
CAPITAL PROJECT DESCRIPTION
WATER DISTRIBUTION SYSTEM PROJECTS - "D" RESERVOIR - BLACK RAIL ROAD IMPROVEMENTS
PROJECT NAME
3954
PROJECT NO.
PROJECT LOCATION MAP:
PROJECT
PROJECT LOCATION:
Black Rail Road segment adjacent to "D" Tank Reservoir.
PROJECT DESCRIPTION:
Black Rail Road improvements include paving, base, sidewalks, curb and
gutter, grading, retaining wall, and undergrounding of existing utilities.
PROJECT NEED:
The Black Rail Road improvements fronting the "D" Tank Reservoir are
required by CUP 03-15.
FINANCING:
Purpose
Design
Construction
Admin/Inspection
Total Cost =
Estimated Cost
$28,000
$314,500
$24,500
$367,000
Funding Source
Water Replacement
Water Replacement
Water Replacement
Blackrail Page 123
CAPITAL PROJECT DESCRIPTION
WATER DISTRIBUTION SYSTEM - "D" RESERVOIR IMPROVEMENTS
PROJECT NAME
3932
PROJECT NO.
PROJECT LOCATION MAP:PROJECT LOCATION:
The "D" Reservoir site is located on Black Rail Road south of Poinsettia Lane.
PROJECT DESCRIPTION:
The "D" Reservoir improvements includes a slurry seal of all of the existing
asphalt concrete pavement.
PROJECT NEED:
Pavement maintenance is required to maintain a safe and smooth driving
surface while extending the useful service of the site pavement.
FINANCING:
Purpose
Construction
Admin/Design/lnsp
Total Cost =
Estimated Cost Funding Source
$142,500
$13,500
$156,000
Water Replacement Fund
Water Replacement Fund
D Tanks
Page 124
fiilfillfiflflflllflllfieiflllflllllll
i I i i i i I i i i i i i i i i i i i i i i
CAPITAL PROJECT DESCRIPTION
WATER DISTRIBUTION SYSTEM - "D" RESERVOIR PHASE II
PROJECT NAME
i i i 1 i i i i
3376
PROJECT NO.
PROJECT LOCATION MAP:PROJECT LOCATION:
Adjacent to existing "D" Reservoir.
PROJECT DESCRIPTION:
Construct new 8.5 MG water reservoir to service 375 Zone.
PROJECT NEED:
Provide additional daily storage within the distribution system for ultimate
demands.
FINANCING:
Purpose
Construction
Construction
Total Cost =
Estimated Cost Funding Source
$5,978,099
$1,992,630
$7,970,729
Water Connection
Water Replacement
D Resll Page 125
CAPITAL PROJECT DESCRIPTION
WATER DISTRIBUTION SYSTEM - DEMOLITION OF WATER FACILITIES AT PAJAMA DRIVE
PROJECT NAME
3955
PROJECT NO.
PROJECT LOCATION MAP:PROJECT LOCATION:
Corner of Pajama Drive and Mesa Boulevard in the City of Oceanside.
PROJECT DESCRIPTION:
Remove an existing abandoned surge tank and a control building.
PROJECT NEED:
Facilities were abandoned in 1971 when Carlsbad began using imported water
and quit pumping from the San Luis Rey River Valley.
FINANCING:
Purpose Estimated Cost Funding Source
Construction $40,000
Admin/Design/Inspection $20,000
Water Replacement
Water Replacement
Total Cost =$60,000
Pajamadr
m Ft mm mm
Page 126
I f 1 I 1 I 1 i 1 t 1 I i I I I 1 I 1 I 1 I 1 I 1 I 1
II if 11 ii II ii i i i i i i 1 t i i i
CAPITAL PROJECT DESCRIPTION
WATER DISTRIBUTION SYSTEM - DESALINATION GROUNDWATER/SEAWATER STUDY
PROJECT NAME
NONE
PROJECT NO.
PROJECT LOCATION MAP:
N/A
PROJECT LOCATION:
Not Applicable.
PROJECT DESCRIPTION:
Preparation of a report investigating various methods of treating City owned
groundwater located in the San Luis aquifer in Oceanside and identifying
conveyance methods to transport the treated water to Carlsbad. Also included
is a study of the feasibility of constructing a seawater desalination plant and
identifying potential sites upon which to construct a desalination plant.
PROJECT NEED:
To develop supplemental source of water.
FINANCING:
Purpose
Planning Study
Total Cost =
Estimated Cost
$719,260
$719,260
Funding Source
Water Replacement
DESALINA Page 127
CAPITAL PROJECT DESCRIPTION
WATER DISTRIBUTION SYSTEM - EL CAMINO REAL BETWEEN COLLEGE & JACKSPAR
PROJECT NAME
5003
PROJECT LOCATION MAP:
PROJECT NO.
#4
PROJECT LOCATION:
Jackspar Drive from Longfellow to El Camino Real, south on El Camino Real to
College Boulevard, and northeast on College Boulevard to Badger Lane.
PROJECT DESCRIPTION:
Construct 4,000 feet of 12-inch watermain.
PROJECT NEED:
Connects isolated portions of 375 Zone and provides for supply from Maerkle
Reservoir for existing and future development.
FINANCING:
Purpose
Construction
Adm/Design/lnsp
Total Cost =
Estimated Cost Funding Source
$529,600
$162,000
$691,600
Water Connection
Water Connection
Coll ECR Page 128
ii ii ii ii li ii f I t I • I II ti ii ii § i IJ li ii ii ii
t i ii 11 ii ii it f i i i 1 lilt i i i i i
CAPITAL PROJECT DESCRIPTION
WATER DISTRIBUTION SYSTEM - EL CAMINO REAL CROSSING AT KELLY DRIVE
PROJECT NAME
5002
PROJECT LOCATION MAP:
PROJECT NO.
#31
PROJECT LOCATION:
El Camino Real at Kelly Drive.
PROJECT DESCRIPTION:
Install 300 LF of 12" line.
(In 490 H.G. Zone)
PROJECT NEED:
To meet the future demands of the area. Increase supply to 255 Zone directly
from 490 Zone through Kelly Pressure Reducing Station.
FINANCING:
Purpose
Design/Construction
Total Cost =
Estimated Cost
$104,000
$104,000
Funding Source
Water Connection
ECRCROSS Page 129
CAPITAL PROJECT DESCRIPTION
WATER DISTRIBUTION SYSTEM - EL CAMINO REAL (PALOMAR AIRPORT ROAD SOUTH)
PROJECT NAME
3446
PROJECT LOCATION MAP:
PALOMAR
AIRPORT
PROJECT NO.
#16
PROJECT LOCATION:
El Camino Real - Palomar Airport Road South 6,100 LF.
PROJECT DESCRIPTION:
Replace 20" steel water line in El Camino Real South 6,100 LF with a new
24-inch water line.
PROJECT NEED:
Replacing old steel water line to avoid high maintenance costs and extend
pipeline to new Poinsettia Lane road alignment.
FINANCING:
Purpose
Design
Construction
Admin/Inspection
Total Cost =
Estimated Cost
$305,000
$2,620,000
$300,000
$3,225,000
Funding Source
Water Replacement
Water Replacement
Water Replacement
Page 130
ECRPARSO
• t i ii • i * i i i ii ii ii 11 II II II II
ill!\ I I i i i I I i I i i I I
CAPITAL PROJECT DESCRIPTION
WATER DISTRIBUTION SYSTEM - EL CAMINO REAL TRANSMISSION MAIN
LISA STREET TO KELLY DRIVE
PROJECT NAME
3844
PROJECT LOCATION MAP:
RABCHO CARLSBAD
MOBILE HOME
PARK
PROJECT NO.
#3
PROJECT LOCATION:
El Camino Real from Lisa Street to Kelly Drive.
PROJECT DESCRIPTION:
Construct 2,000 feet of 10-inch diameter pipeline from Lisa Street to
Kelly Drive.
PROJECT NEED:
To provide a looping water pipeline in the area. Needed to meet master plan
requirements and increase reliability.
FINANCING:
Purpose
Design/Adm/lnsp
Construction
Total Cost =
Estimated Cost Funding Source
$50,000
$420,000
$470,000
Water Connection
Water Connection
ECR Iran Page 131
CAPITAL PROJECT DESCRIPTION
WATER DISTRIBUTION SYSTEM - EL CAMINO REAL TRANSMISSION MAIN FROM
FARADAY AVENUE TO COUGAR DRIVE
PROJECT NAME
3843
PROJECT NO.
PROJECT LOCATION MAP:
PROJECT
SITE
ECRTRANS
11 II
PROJECT LOCATION:
El Camino Real from Faraday Avenue north to Cougar Drive and pressure
reducing station north side of Faraday Avenue.
PROJECT DESCRIPTION:
Construction of 1,500 feet of 30-inch diameter transmission main and pressure
reducing station.
PROJECT NEED:
Larger diameter pipe reduces pressure loss during emergency supply to
550 Zone from Maerkle Reservoir.
FINANCING:
Purpose
Design
Construction
Total Cost =
Estimated Cost
$50,000
$724,100
$774,100
Funding Source
Water Replacement
Water Replacement
Page 132
I 1 I I I 1 I I I I I I I I I I I 1 I I
ii il II II ii II t I II i i I I i i l i II II i I if
CAPITAL PROJECT DESCRIPTION
WATER DISTRIBUTION SYSTEM - EL CAMINO REAL/CARLSBAD VILLAGE DRIVE
WATER PIPELINE REPLACEMENT
PROJECT NAME
3911
PROJECT NO.
PROJECT LOCATION MAP:
PROJECT
SITE
PROJECT LOCATION:
El Camino Real at Carlsbad Village Drive.
PROJECT DESCRIPTION:
Replace 200 feet of existing 10-inch diameter water pipeline crossing
El Camino Real at Carlsbad Village Drive. The pipeline shall be replaced
between existing pressure reducing stations. Existing pipeline cannot be
repaired.
PROJECT NEED:
Existing pipeline has corroded and cannot be repaired because of depth and
interference with existing storm drain. This pipeline supplies water to an
existing pressure reducing station supplying water to the 330 pressure zone.
Replacing this pipeline will ensure water redundancy and reliability in the
services area.
FINANCING:
Purpose
Design
Construction
Total Cost =
Estimated Cost
$15,000
$50,000
$65,000
Funding Source
Water Replacement
Water Replacement
ECR CVD
Page 133
CAPITAL PROJECT DESCRIPTION
WATER DISTRIBUTION SYSTEM - EL FUERTE (NORTH OF LOKER)
PROJECT NAME
3912
PROJECT LOCATION MAP:
PROJECT
PROJECT NO.
#13
PROJECT LOCATION:
El Fuerte Avenue between Loker north to future Faraday Avenue.
PROJECT DESCRIPTION:
Install 2,200 LF of 16-inch line.
(In 700-550 H.G Zone).
PROJECT NEED:
To meet the future demands of the area. Developer to pay 75% of the cost.
Provides looped supply to new North 700 Zone.
FINANCING:
Purpose
Design/Construction
Design/Construction
Total Cost =
Estimated Cost Funding Source
$148,750
$246,900 *
$395,650
Water Connection Fee
Other - Developer
*Developer cost not shown in CIP schedules.
ELFUERT5 Page 134
I I I I I I I 1 I I I 1 f I I I I 1 I 1 I 1 I 1 I I I i Illllllltl
i i i i i i i i i i ii i » i i if « * I i II i i i i
CAPITAL PROJECT DESCRIPTION
WATER DISTRIBUTION SYSTEM - EL FUERTE (ALGA ROAD TO PO1NSETTIA LANE)
PROJECT NAME
3816
PROJECT NO.
PROJECT LOCATION MAP:PROJECT LOCATION:
Future El Fuerte from Alga Road to Poinsettia Lane.
PROJECT DESCRIPTION:
Install 5,050 LF of 30-inch line and a pressure regulating station.
(In 700 H.G. Zone).
PROJECT NEED:
To meet the future demands of the area.
FINANCING:
Purpose Estimated Cost Funding Source
Design/Construction $2,000,000 Water Connection Fee
Total Cost = $2,000,000
ELFUERTE Page 135
CAPITAL PROJECT DESCRIPTION
3913
WATER DISTRIBUTION SYSTEM - EL FUERTE (POINSETTIA LANE TO PALOMAR AIRPORT ROAD)
PROJECT NAME
PROJECT LOCATION MAP:
PROJECT NO.
#15
PROJECT LOCATION:
Future El Fuerte south of Palomar Airport Road.
PROJECT DESCRIPTION:
Install 5,200 LF of 24-inch line.
PROJECT NEED:
To meet the future demands of the area. Connects 700 North and 700 South
pressure zones.
FINANCING;
Purpose
Design/Adm/lnsp
Construction
Total Cost =
Estimated Cost Funding Source
$291,000
$850,000
$1,141,000
Water Connection Fee
Water Connection Fee
ELFUERT4 Page 136
II 11 II 11 11 II II II II II VI II II II II II II II II
iiiiillfiiiltiiii lift i i i l t i i i i i i i t I
CAPITAL PROJECT DESCRIPTION
WATER DISTRIBUTION SYSTEM - EL FUERTE AND CORINTIA STREET
PROJECT NAME
PROJECT LOCATION MAP:
PROJECT
SITE
•g.
PROJECT NO.
#21
PROJECT LOCATION:
Intersection of El Fuerte and Corintia Street.
PROJECT DESCRIPTION:
Construct Pressure Reducing Station.
PROJECT NEED:
Provide redundant water supply to 680,580 South and 510 Zones.
FINANCING:
Estimated Cost Funding SourcePurpose
Construction
Adm/Design/lnsp
Total Cost =
$121,272
$35,000
$156,272
Water Replacement
Water Replacement
EIFuertS
Page 137
CAPITAL PROJECT DESCRIPTION
WATER DISTRIBUTION SYSTEM - ELLERY WATER PUMP PROJECT
PROJECT NAME
3900
PROJECT NO.
PROJECT LOCATION MAP:
VILLAGE
Waterpmp
II II 1 I II 11 II II
PROJECT LOCATION:
Ellery Pump Station - Janis Way.
PROJECT DESCRIPTION:
The Water District's Ellery Pump Station is designed to maintain adequate flow
during fire demands and boost pressure in the event of a significant drop in
pressure or increase in demand. The pump station operates from a motor
control center that has a service life in excess of twenty years. The scope of
this project is the replacement of the pump station's motor control center.
PROJECT NEED:
The motor control center for the Ellery Pump Station has over twenty years of
service life. Its design is outdated, major components are obsolete and, as a
result, repairs may not be possible. Replacement of the motor control center
will ensure reliability, efficiency, availability of parts and the ability to pull
maintenance in a safe and timely manner.
FINANCING:
Purpose
Construction
Total Cost =
Estimated Cost
$60,900
$60,900
Funding Source
Water Replacement
Page 138
II II » 1 * • II II II II II
till MI I I i I ii if ti it ii ii i i -
CAPITAL PROJECT DESCRIPTION
iti ii II ii i i
NONE
WATER DISTRIBUTION SYSTEM - FARADAY AVENUE EXTENSION
PROJECT NAME
PROJECT LOCATION MAP:
'ROJECT
Faraday
L
PROJECT NO.
#14
PROJECT LOCATION:
In future Faraday Avenue extension between El Fuerte and Melrose Avenue.
PROJECT DESCRIPTION:
Construct 3,600 feet of 16-inch watermain.
PROJECT NEED:
Provides looped study to LFMZ Zone 16 and supply to 550 Zone from 700 to
550 PRV.
FINANCING:
Purpose
Construction
Adm/Design/lnsp
Total Cost =
Estimated Cost Funding Source
$582,773
$167,000
$749,773
Water Connection
Water Connection
Page 139
CAPITAL PROJECT DESCRIPTION
WATER DISTRIBUTION SYSTEM - FOUSSAT ROAD WELL ABANDONMENT
PROJECT NAME
3903
PROJECT LOCATION MAP:
Foussat
II II II II II II II
PROJECT NO.
#32
PROJECT LOCATION:
Southeast corner of Foussat Road and Mission Avenue in Oceanside.
PROJECT DESCRIPTION;
Abandon well per State standards, remove pumps, valves, concrete structures
and general restoration of property.
PROJECT NEED:
The existing well and equipment are not usable and must be properly removed.
FINANCING:
Estimated Cost Funding SourcePurpose
Design
Construction
Total Cost =
$40,000
$162,500
$202,500
Water Replacement Fund
Water Replacement Fund
Page 140
II II II II II
1111 I I I I I I i I I | i i i : • I i i i I i i
CAPITAL PROJECT DESCRIPTION
l i I I 1 I 1 i I I i
3821
WATER DISTRIBUTION SYSTEM - LAKE CALAVERA RESERVOIR IMPROVEMENTS
PROJECT NAME
PROJECT NO.
PROJECT LOCATION MAP:
PROJECT
SITE
CITYJff OCEANSIDE
CITY OF CARLSBAD
L
"j LAKE
CALAVERA
PROJECT LOCATION:
Lake Calavera in the northeast quadrant of the City.
PROJECT DESCRIPTION:
Replace outlet tower valves and piping to restore function. Repair existing
spillway and channel to improve flow, safety, and access. Upgrade existing
access road and improve security with fencing and gates.
PROJECT NEED:
The existing valves located within the outlet tower have failed and water is
presently draining from the reservoir and cannot be stopped. Left unrepaired,
the lake will completely dry up and does not comply with dam safety
requirements. The walkway structure to the outlet tower was removed due to
safety issues, but direct access to the outlet structure needs to be restored for
maintenance purposes. Repair of the outlet structure will also allow Calavera
Dam to function as a flood control retention facility to help alleviate potential
downstream flooding in the area of the Rancho Carlsbad Mobile Home Park.
FINANCING:
Purpose Estimated Cost Funding Source
Environmental
Design
Construction
Admin/Inspection
Total Cost =
$57,850
$404,800
$3,010,393
$294,230
$3,767,273
Water Replacement
Water Replacement
Water Replacement
Water Replacement
Lake_cal Page 141
CAPITAL PROJECT DESCRIPTION
WATER DISTRIBUTION SYSTEM - MAERKLE PUMP STATION
PROJECT NAME
NONE
PROJECT LOCATION MAP:
PROJECT NO.
#29(a) & (b)
PROJECT LOCATION:
Maerkle Reservoir.
PROJECT DESCRIPTION:
Enlarge pump station.
PROJECT NEED:
Required for emergency supply from Maerkle Reservoir.
FINANCING:
Purpose Estimated Cost Funding Source
Construction
Construction
Total Cost =
$747,100
$747,100
$1,494,200
Water Connection
Water Replacement
Page 142MaerkleS
ii ii 11 fi IB vi ft* i I if 11 ti 11 ii 11 ii ii ii 11 ii
I i \ I i I 1 I t I i 1 I i i i I i i i = i i i I
CAPITAL PROJECT DESCRIPTION
WATER DISTRIBUTION SYSTEM - MAERKLE RESERVOIR STORAGE (TAP #2)
PROJECT NAME
il II it i i
NONE
PROJECT LOCATION MAP:
PROJECT NO.
#28
PROJECT LOCATION:
Adjacent to Maerkle Reservoir.
PROJECT DESCRIPTION:
Construct buried 15 MG water storage reservoir next to existing Maerkle
Reservoir.
PROJECT NEED:
Provides additional emergency storage to meet 10-day storage criteria based
on ultimate demands.
FINANCING:
Purpose Estimated Cost Funding Source
Construction $11,809,514 Water Connection
Adm/Design/lnsp $1,475,000 Water Connection
Total Cost =$13,284,514
Maerkle Page 143
CAPITAL PROJECT DESCRIPTION
NONE
WATER DISTRIBUTION SYSTEM - MARRON ROAD (PRESSURE REGULATING STATION TO OCEANSIDE) PROJECT NO.
PROJECT NAME
PROJECT LOCATION MAP:
MARRONRD
* m i r • • i i f
PROJECT LOCATION:
Marron Road from Avenida de Anita easterly 6,600 feet.
PROJECT DESCRIPTION:
Install 6,600 LF of 12-inch line and two pressure regulating stations. Developer
to pay 50% of cost.
PROJECT NEED:
To meet future demands in accordance with Growth Management Standards.
Provide additional supply to 255 Zone.
FINANCING:
Purpose Estimated Cost
Design/Construction $715,464
Design/Construction $715,464 *
Funding Source
Water Connection
Other - Developer
Total Cost =$1,430,928
'Developer cost not included in CIP schedules.
Page 144
I I
I 1 I I f I 1 I I I i | | 1 I t I 1 I i I t I . i
CAPITAL PROJECT DESCRIPTION
WATER DISTRIBUTION SYSTEM - MASTER PLAN UPDATE
PROJECT NAME
i i i I I I I
NONE
PROJECT NO.
PROJECT LOCATION MAP:
LOCATIONS THROUGHOUT THE CITY
Mstrplan
PROJECT LOCATION:
Throughout the City.
PROJECT DESCRIPTION:
Update the CMWD's 2003 Water Master Plan based on anticipated growth
projections and obtain necessary CEQA approval through an amendment to
the EIR for adoption by City Council.
PROJECT NEED:
The Master Plan update will help identify the need for changes to planned
facilities based on the timing of growth projections and Growth Management
Standards.
FINANCING:
Study
Total Cost =
Estimated Cost
$47,800
$47,800
Funding Source
Water Connection Fee
Page 145
CAPITAL PROJECT DESCRIPTION
WATER DISTRIBUTION SYSTEM - MELROSE DRIVE PALOMAR AIRPORT ROAD TO FARADAY
PROJECT NAME
PROJECT LOCATION MAP:
'ROJECT
PROJECT NO.
#12
PROJECT LOCATION:
Melrose Drive between Palomar Airport Road and Faraday Avenue.
PROJECT DESCRIPTION:
Construct 4,000 feet of 16-inch watermain.
PROJECT NEED:
Provide looped supply to new North 700 Zone in LFMZ Zone 16 business park.
FINANCING:
Purpose Estimated Cost Funding Source
Construction
Adm/Design/lnsp
Total Cost =
$609,800
$186,500
$796,300
Water Connection
Water Connection
Melrose Page 146
II II II II II II II II il II ft 1 I I « I I 1 II fill If 11
i 1 i i i i i 1 I i II it II
CAPITAL PROJECT DESCRIPTION
WATER DISTRIBUTION SYSTEM - MISCELLANEOUS PIPELINE REPLACEMENTS
PROJECT NAME
3904
PROJECT NO.
PROJECT LOCATION MAP:
CITYWIDE
PROJECT LOCATION:
Various locations.
PROJECT DESCRIPTION:
Replace existing small diameter and older pipelines at 14 locations.
PROJECT NEED:
Provide increased water supply to meet fire flow requirements.
FINANCING:
Funding SourcePurpose
Design
Construction
Admin/Inspection
Total Cost =
Estimated Cost
$150,000
$1,647,151
$49,900
$1,847,051
Water Replacement
Water Replacement
Water Replacement
WTFLPIPE Page 147
CAPITAL PROJECT DESCRIPTION
WATER DISTRIBUTION SYSTEM - MISCELLANEOUS STORAGE TANK REPAIRS
PROJECT NAME
3823
PROJECT NO.
PROJECT LOCATION MAP:
VARIOUS LOCATIONS
Misctank
I 1 I
PROJECT LOCATION:
At various existing storage tank locations.
PROJECT DESCRIPTION:
Remove and replace deteriorated tank floor sections, ladders and
appurtenances. Install cathodic protection systems.
PROJECT NEED:
Existing tanks have corrosion problems to rectify.
FINANCING:
Purpose Estimated Cost Funding Source
Design
Construction
Total Cost =
$20,000
$141,000
$161,000
Water Replacement
Water Replacement
1 I * II II II • I II • I II II II VI 11 II II II
Page 148
I I I 1
i i i i t i i i I i i 1 i I i i !.i I i I •* I i
CAPITAL PROJECT DESCRIPTION
WATER DISTRIBUTION SYSTEM - MISCELLANEOUS WATER RESERVOIR FENCING
PROJECT NAME
3822
PROJECT NO.
PROJECT LOCATION MAP:
TAP'
COSTA LO
PROJECT LOCATION:
At various water reservoir locations throughout the City as shown on the map
including the TAP, "C", "E", Santa Fe II and La Costa Lo.
PROJECT DESCRIPTION:
Install protective fencing around the identified reservoir sites for safety and
security purposes.
PROJECT NEED:
Project is required to protect the existing reservoir sites from vandalism and to
ensure safety of the public. Ongoing development in the City has made these
once isolated reservoir sites more accessible to the public thus intensifying the
need for protective fencing.
FINANCING:
Purpose
Construction
Total Cost =
Estimated Cost Funding Source
$120,400 Water Replacement Fund
$120,400
Reservoirs Page 149
CAPITAL PROJECT DESCRIPTION
WATER DISTRIBUTION SYSTEM - OCEANSIDE INTERTIE UPGRADE
PROJECT NAME
3531
PROJECT NO.
PROJECT LOCATION MAP:
OSIDEINT
II II I! II II II ft * 1
PROJECT LOCATION:
El Camino Real near State Highway 78.
PROJECT DESCRIPTION:
Make improvements to increase reliability of water system intertie with City of
Oceanside. System supplies 5 cfs of treated water to Carlsbad. During
emergencies and periods of water supply curtailment, the Oceanside intertie
provides backup.
PROJECT NEED:
The system requires valve, pipe, and meter replacement.
FINANCING:
Purpose Estimated Cost Funding Source
Design/Construction $110,700 Water Replacement
Total Cost = $110,700
Page 150
i it ii ii vi •• ri t i vi
ii il if if i i i i i i i § i i i t i .
CAPITAL PROJECT DESCRIPTION
i i i i i
3910
i i
WATER DISTRIBUTION SYSTEM - PALOMAR AIRPORT ROAD/EL CAMINO REAL PUMP STATION
PROJECT NAME
PROJECT LOCATION MAP:
PALOMAR
AIRPORT
PROJECT NO.
#20
PROJECT LOCATION:
Intersection of Palomar Airport Road and El Camino Real.
PROJECT DESCRIPTION:
Grade site and construct a pump station to supply water from 490 pressure
zone to 700 pressure zone.
PROJECT NEED:
To supply water from Maerkle Reservoir (490 pressure zone) to 700 pressure
zone during emergencies and during routine maintenance of the imported
water aqueducts.
FINANCING:
Purpose
Construction
Construction
Total Cost =
Estimated Cost
$990,350
$997,350
$1,987,700
Funding Source
Water Replacement Fee
Water Connection Fee
700 ZONE Page 151
CAPITAL PROJECT DESCRIPTION
WATER DISTRIBUTION SYSTEM - POINSETTIA LANE
(EL CAMINO REAL TO SKIMMER COURT)
PROJECT NAME
PROJECT LOCATION MAP:
PROJECT NO.
$25
PROJECT LOCATION:
Poinsettia Lane from El Camino Real to Skimmer Court.
PROJECT DESCRIPTION:
Install 1,300 LF of 12-inch line.
(In 375 H.G. Zone).
PROJECT NEED:
Parallel existing 8-inches to increase capacity in the 375 Zone and supply from
550 Zone.
FINANCING:
Purpose
Design/Adm/lnsp
Construction
Total Cost =
Estimated Cost Funding Source
$50,000
$185,141
$235,141
Water Connection Fee
Water Connection Fee
Page 152
POINSET2
II II II II II 11 II II II II II t I « I II • I II II II II
i i I I i 1 i i i i i i I 1 » i $ I i ' I s i ,.
CAPITAL PROJECT DESCRIPTION
i i i i I i 1 i i I i
WATER DISTRIBUTION SYSTEM - POINSETTIA LANE (SKIMMER COURT TO CASSIA ROAD) PROJECT NO.
PROJECT NAME
PROJECT LOCATION MAP:
#17
PROJECT LOCATION:
In Poinsettia Lane between Skimmer Court and Cassia Road.
PROJECT DESCRIPTION:
Construct 4,500 feet of 12-inch watermain.
PROJECT NEED:
Completes 375 Loop on Poinsettia Lane. Increase capacity to/from D3
Reservoir.
FINANCING:
Purpose
Construction
Construction
Total Cost =
Estimated Cost Funding Source
$357,732
$456,161
$813,893
Water Connection
Water Replacement
Poinskim
Page 153
CAPITAL PROJECT DESCRIPTION
WATER DISTRIBUTION SYSTEM - POINSETTIA LANE EAST OF BLACK RAIL ROAD
PROJECT NAME
PROJECT LOCATION MAP:
PROJECT NO.
#18
PROJECT LOCATION:
Poinsettia Lane -1,100 feet east of Black Rail Road.
PROJECT DESCRIPTION:
Construct 1,100 feet of 30-inch watermain.
PROJECT NEED:
Increase supply to 550 Zone and D3 Reservoir.
FINANCING:
Estimated CostPurpose
Construction
Construction
Total Cost =
$214,953
$214,848
$429,801
Funding Source
Water Connection
Water Replacement
Page 154Poinblack
11 il 11 il 11 li li 11 11 11 •• • l i • i i 11 fi 11 • I 11
l l i i i i i I i i | r j i ; i I t i § i , •.
CAPITAL PROJECT DESCRIPTION
i i
WATER DISTRIBUTION SYSTEM - PRESSURE REDUCING STATION - SYCAMORE CREEK
PROJECT NAME
PROJECT LOCATION MAP:
PROJECT
PROJECT NO.
#30
PROJECT LOCATION:
Within Sycamore Creek area of LFMZ Zone 15.
PROJECT DESCRIPTION:
Upgrade existing Pressure Reducing Station for 490 to 375 Zone.
PROJECT NEED:
Increase capacity of existing Pressure Reducing Station to supply new
development from 490 Zone.
FINANCING:
Purpose
Construction
Adm/Design/lnsp
Total Cost =
Estimated Cost Funding Source
$92,257 Water Connection
$25,000 Water Connection
$117,257
PRSJmpr
Page 155
CAPITAL PROJECT DESCRIPTION
WATER DISTRIBUTION SYSTEM - PRESSURE REGULATING STATION
(CANNON ROAD AND COLLEGE BOULEVARD)
PROJECT NAME
3878
PROJECT NO.
PROJECT LOCATION MAP:
LAKE
CALAVERA
PRESSREG
ii ii ii it • i
PROJECT LOCATION:
Future intersection of Cannon Road and College Boulevard.
PROJECT DESCRIPTION:
Install pressure regulating station.
Special Note: This project will take place when the existing Cannon
Reservoir is taken out of service.
(In 490-392 H.G. Zones).
PROJECT NEED:
To meet the future demands of the area.
FINANCING;
Purpose Estimated Cost Funding Source
Design/Construction $250,000 Water Connection Fee
Total Cost= $250,000
* « PI 11 m i ii ri wrm
Page 156
ri i i «• i I «
i i i i i i i i ) , ! S. i i S i i i i < i
CAPITAL PROJECT DESCRIPTION
f i i t i i i
3858
WATER DISTRIBUTION SYSTEM - RANCHO CARRILLO OVERSIZING/EXTENSION
PROJECT NAME
PROJECT NO.
PROJECT LOCATION MAP:
2-8" WATER
PIPELINE
EXTENSIONS
10" OVERSIZE
WATER PIPELINE
PROJECT LOCATION:
The waterline extends from Melrose Drive west along Via Patron and Terraza
Portico to an existing waterline in Carrillo Way. Also include are two short
extension within Paseo Aspada and Rancho Miel.
PROJECT DESCRIPTION:
Construction of new 8" and 10" water mains. A 10" waterline will be extended
from an existing waterline in Melrose Drive to an existing waterline in Carrillo
Way through the Village 'N' development of Rancho Carrillo to provide a looped
water connection. The project also includes the extension of two 8" lines within
Paseo Aspada and rancho Miel to complete the looped system.
PROJECT NEED:
To meet the future demands of the area and to provide for a looped water line
for greater reliability to the existing residents within Village 'N' of the Rancho
Carrillo development.
FINANCING:
Purpose
Design/Construction
Total Cost =
Estimated Cost
$93,700
$93,700
Funding Source
Water Connection Fee
RC_Over Page 157
CAPITAL PROJECT DESCRIPTION
WATER DISTRIBUTION SYSTEM - SAN MARCOS BLVD. PIPELINE REPLACEMENT
PALOMAR AIRPORT ROAD WEST OF SAN DIEGO COUNTY WATER AUTHORITY (SDCWA)
PROJECT NAME
3956
PROJECT LOCATION MAP:
PROJECT NO.
#26
PROJECT LOCATION:
Palomar Airport Road west of the San Diego County Water Authority (SDCWA)
Connection #1.
PROJECT DESCRIPTION:
Replace approximately 4,100 feet of existing 27-inch and 21-inch diameter
steel waterline with new 30-inch steel watermain.
PROJECT NEED;
Reduce velocity and provide increased capacity from SDCWA #1 Connection
to 700 Zone. In addition, both the 21-inch and 27-inch pipes are over 40 years
old and at the end of their service life.
FINANCING:
Purpose
Design
Construction
Adm/lnsp
Total Cost =
Estimated Cost Funding Source
$101,000
$2,870,241
$120,000
$3,091,241
Water Replacement
Water Replacement
Water Replacement
PARwater
• i t i • i ft 1 BF1
Page 158
9 VI II II II II II II II II 11 II
i t t i 1 i i i i t i t i
CAPITAL PROJECT DESCRIPTION
3915
WATER DISTRIBUTION SYSTEM - TANGLEWOOD PRESSURE REDUCING STATION REPLACEMENT PROJECT NO.
PROJECT NAME
PROJECT LOCATION MAP:PROJECT LOCATION:
Intersection of Carlsbad Village Drive and El Camino Real.
PROJECT DESCRIPTION:
Replace vault, piping and valves of existing pressure reducing station.
PROJECT NEED:
The existing pressure reducing station is to be replaced due to deteriorated
condition of vault, valve and piping.
FINANCING:
Purpose
Design
Construction
Total Cost =
Estimated Cost Funding Source
$50,000
$282,000
$332,000
Water Replacement Fund
Water Replacement Fund
Tangle Page 159
CAPITAL PROJECT DESCRIPTION
WATER DISTRIBUTION SYSTEM - TAP RESERVOIR EXTERIOR PAINTING
PROJECT NAME
3853
PROJECT NO.
PROJECT LOCATION MAP:
Extr_pnt
• i ii f i
PROJECT LOCATION:
Northwest corner of Carlsbad Village Drive at College Boulevard.
PROJECT DESCRIPTION;
Repaint the exterior of TAP Reservoir.
PROJECT NEED:
The existing paint has deteriorated and requires repainting prior to new homes
being constructed. Also will include anti-graffiti coating.
FINANCING;
Purpose
Design
Construction
Total Cost =
Estimated Cost Funding Source
$5,000
$127,700
$132,700
Water Replacement
Water Replacement
m l
Page 160
•FI VI VI f « i 1 I J IJ 11 11 LI II
1 i i i i
CAPITAL PROJECT DESCRIPTION
WATER DISTRIBUTION SYSTEM - WATER SYSTEM INTERTIE CONNECTION
PROJECT NAME
3664
PROJECT NO.
PROJECT LOCATION MAP:
SITE
SITE
PROJECT LOCATION:
VID - Business Park Drive
Vallecitos Water District
Olivenhain Water District
San Dieguito Water District
PROJECT DESCRIPTION:
Construct pipeline system intertie with adjacent water agencies including
Vista Irrigation District, Vallecitos Water District, Olivenhain Water District, and
San Dieguito Water District.
PROJECT NEED:
During emergencies, these interties could supply water to the City and also
provide water back to the adjacent agencies.
FINANCING:
Purpose
Design/Construction
Total Cost =
Estimated Cost
$439,000
$439,000
Funding Source
Water Replacement
WTRINTER Page 161
i i I t 1 i I i i
RECYCLED WATER PROJECTS
FUNDING MATRIX FOR RECYCLED WATER PROJECTS
PROJ
NO.
5200
3914
3487
3675
3888
3890
3887
3889
FUND
NO.
52001
39141
34871
36753
38881
38901
38871
38891
PROJECT TITLE
CHESTNUT AVENUE RECYCLED WATER LINE
ECFt/TAMARACK PUMP STATION REMOVAL
I-5 RECYCLED WATER TRANSMISSION LINE
PASEO DEL NORTE RECYCLED PIPELINE REPLACEMENT
PUMP STATION REMOVAL
RECYCLED WATER PH II - FACILITY
RECYCLED WATER PH II - FLOW EQUALIZATION
RECYCLED WATER PH II - MAHR RESERVOIR IMPROV.
RECYCLED WATER PH II - PIPELINES
RECYCLED WATER PH II - PUMP STATIONS
FUNDING
SOURCE
WATER REPL
WATER REPL
WATER REPL
WATER REPL
WATER REPL
RECL WATER
RECL WATER
RECL WATER
RECL WATER
RECL WATER
TOTAL
BUDGET
436,100
80,019
133,305
727,200
442,700
12,130,019
4,128,280
2,957,000
21,852,521
4,918,574
FUTURE YEAR BUDGET AMOUNTS
YEAR1
2006-07
YEAR 2
2007-2008
436,100
YEARS
2008-2009
80,019
YEAR 4
2009-2010
YEARS
2010-2011
YEAR 6-10
2011-2016
BUILDOUT
2016-2021
1 • 1 * 1 » « n
Page 162
mm *i pi ii EI 11 pi pi ii ia ii 11
I I I I I i I I | I i I i 1 t I i ? i t i ! i -I i 1 i i i J :
CAPITAL PROJECT DESCRIPTION
RECYCLED WATER PROJECTS - CHESTNUT AVENUE RECYCLED WATER LINE
PROJECT NAME
i i j
NONE
PROJECT NO.
PROJECT LOCATION MAP:PROJECT LOCATION:
Chestnut Avenue from 1-5 to SDNR right-of-way.
PROJECT DESCRIPTION:
Construct an 8-inch PVC recycled waterline in Chestnut Avenue from the
existing line in 1-5 to the railroad right-of-way.
PROJECT NEED:
The new 8-inch line will provide the distribution of recycled water to the future
Pine School Park and the Coastal Rail Trail.
FINANCING:
Purpose
Administration
Design
Construction
Total Cost =
Estimated Cost Funding Source
$17,000
$25,000
$394,100
$436,100
Water Replacement
Water Replacement
Water Replacement
Chestnut Page 163
CAPITAL PROJECT DESCRIPTION
RECYCLED WATER PROJECTS - EL CAMINO REAL AND TAMARACK RW PUMP STATION
PROJECT NAME
NONE
PROJECT NO.
PROJECT LOCATION MAP:
CALAVERAYfASTEWATERTREATMENTPLANT
ECR_PUMP
i ii ii ii
PROJECT LOCATION:
Southeast corner of El Camino Real and Tamarack Avenue.
PROJECT DESCRIPTION:
Remove existing pump station and rehabilitate the site.
PROJECT NEED:
Existing pump station was constructed for the Calavera Wastewater Treatment
Plant, which is no longer necessary. Removes attractive nuisance and reduces
maintenance needs.
FINANCING:
Purpose
Design
Construction
Admin/Inspection
Total Cost =
Estimated Cost
$10,000
$53,519
$16,500
$80,019
Funding Source
Water Replacement
Water Replacement
Water Replacement
ii mm i ii ii PI mm m-m * i
164
m i
1 i i I i i i i 1 i l i I i i i i i I i J > i
CAPITAL PROJECT DESCRIPTION
RECYCLED WATER PROJECTS - 1-5 RECYCLED WATER TRANSMISSION LINE
PROJECT NAME
i i i i i j
5200
PROJECT NO.
PROJECT LOCATION MAP:
PROJECT
PROJECT LOCATION:
1-5 Freeway from Palomar Airport Road to Carlsbad Village Drive.
PROJECT DESCRIPTION;
Caltrans installed a transmission main from Poinsettia Lane north to
Jefferson Street in 1996. The pipeline was oversized to supply recycled water
to areas north of Tamarack Avenue.
PROJECT NEED:
To supply recycled water to Carlsbad north of Tamarack Avenue.
FINANCING:
Purpose Estimated Cost Funding Source
Design/Construction $133,305 Water Replacement
Total Cost = $133,305
I5TRNSLN
Page 165
CAPITAL PROJECT DESCRIPTION
RECYCLED WATER PROJECTS - PASEO DEL NORTE RECYCLED PIPELINE REPLACEMENT
PROJECT NAME
3914
PROJECT NO.
PROJECT LOCATION MAP:PROJECT LOCATION:
In Paseo Del Norte from Poinsettia Park boundary north to Palomar Airport
Road.
PROJECT DESCRIPTION:
Construct 4,000 feet of 12-inch diameter pipe in Paseo Del Norte from
Sea Gate Drive to Palomar Airport Road, and in Palomar Airport Road from
Paseo Del Norte to Armada Drive. Other alternative pipeline alignments will be
considered.
PROJECT NEED:
The existing 12-inch diameter steel pipeline, installed in 1962, from Paseo Del
Norte north to Palomar Airport Road broke in 2001. The existing pipeline is
located in an easement that crosses Encinas Creek near the entrance to
Costco. Attempts made to locate and fix the break have been unsuccessful
primarily because of the woodland area. The recycled water master plan
requires this pipeline to be in place to provide adequate flows to areas north of
Palomar Airport Road in the 384 pressure zone for future recycled water
customers.
FINANCING:
Purpose Estimated Cost
Design & Environmental $60,000
Construction $667,200
Funding Source
Water Replacement
Water Replacement
Total Cost =$727,200
PDN_pipe 166
II II II II II II fl II II VI VI VI * 1 II VI VI VI II II
ti ti ti i i i i i i i 11 i f i II il i I
CAPITAL PROJECT DESCRIPTION
RECYCLED WATER - PUMP STATION REMOVAL
PROJECT NAME
3487
PROJECT NO.
PROJECT LOCATION MAP:
PALOMAR
AIRPORT
PROJECT
PROJECT LOCATION:
El Camino Real south of Palomar Airport Road.
PROJECT DESCRIPTION:
Remove existing pump station and rehabilitate site.
PROJECT NEED:
Upon completion of Encina Basin Phase II and Carlsbad Boulevard
Reclamation Facility Projects, existing pump station is no longer necessary.
FINANCING:
Purpose Estimated Cost Funding Source
Design/Construction $442,700 Water Replacement
Total Cost = $442,700
RCSTNUPG Page 167
CAPITAL PROJECT DESCRIPTION
RECYCLED WATER PHASE II - FACILITY
PROJECT NAME
3675
PROJECT NO.
PROJECT LOCATION MAP:
PROJECT
SITE
PROJECT LOCATION:
South of Encina Water Pollution Control Facility (EWPCF).
PROJECT DESCRIPTION:
Design and construction of the Phase II Recycled Water Treatment Facilities
near EWPCF on Avenida Encinas (4.0 mgd). This project is one of a series of
projects included in the Phase II Recycled Water Program as identified in the
City's Recycled Water Master Plan.
PROJECT NEED:
To provide additional recycled water to meet Phase II demand requirements of
4,480 acre-feet per year.
FINANCING:
Purpose
Construction
Total Cost =
Estimated Cost Funding Source
$12,130,019 Recycled Water
$12,130,019
Trt_pmt Page 168
iiiiiiiiiliiiiiitii i i ll i i
CAPITAL PROJECT DESCRIPTION
RECYCLED WATER - RECYCLED WATER PHASE II - FLOW EQUALIZATION
PROJECT NAME
3888
PROJECT NO.
PROJECT LOCATION MAP:
PROJECT
SITE
PROJECT LOCATION:
Adjacent to the Carlsbad Water Reclamation Facility.
PROJECT DESCRIPTION:
Construction of a water storage facility adjacent to the Encina WPCF for the
dual purpose of providing a clean/veil for plant operations and a forebay, which
would allow the pumps to operate at a constant discharge rate or adjust
pumping rates based on peak irrigation periods.
PROJECT NEED:
Reduce the use of potable water by providing reclaimed water for irrigation
purposes.
FINANCING:
Purpose
Total Cost =
Estimated Cost
$4,128,280
Funding Source
Recycled Water
Flowequa
Page 169
CAPITAL PROJECT DESCRIPTION
RECYCLED WATER PROJECTS - PHASE II - MAHR RESERVOIR IMPROVEMENTS
PROJECT NAME
3890
PROJECT NO.
PROJECT LOCATION MAP:
my 78
PROJECT LOCATION:
At Mahr Reservoir.
PROJECT DESCRIPTION:
Mahr Reservoir is an existing earthen fill dam constructed in 1982 to store
recycled water from the Meadowlark Reclamation Facility. It is located east of
Rancho Santa Fe Road just south of Melrose Drive. Both the Meadowlark
Reclamation Facility and Mahr Reservoir are owned and operated by Vallecitos
Water District (VWD).
PROJECT NEED;
To meet water quality and operation needs for CMWD's recycled water system
requires certain improvements be made to Mahr Reservoir. These
improvements include:
• Dredging and cleaning the reservoir bottom
• Modifying the inlet/outlet works
• Adding an aeration/destratification system
• Performing miscellaneous site work
FINANCING:
Purpose
Total Cost:
Estimated Cost
$2,957,000
Funding Source
Recycled Water
Page 170
Mahr II
I I I II f! II II II II II II II fl VI II II II II fl II
till i i i i i i I i s i i f 1 il i I
CAPITAL PROJECT DESCRIPTION
RECYCLED WATER - RECYCLED WATER PHASE II - PIPELINES
PROJECT NAME
3887
PROJECT NO.
PROJECT LOCATION MAP:
PROJECT
PROJECT LOCATION:
Palomar Airport industrial corridor and portion of northeast quadrant.
PROJECT DESCRIPTION:
Construction of approximately 120,126 feet of distribution pipelines ranging in
size from 4 inches to 24 inches in diameter, 3 pressure reducing stations and
connecting the Carlsbad Water Reclamation Facility with the Mahr Reservoir.
PROJECT NEED:
Reduce the use of potable water by providing reclaimed water for irrigation
purposes.
FINANCING:
Purpose
Total Cost =
Estimated Cost Funding Source
$21,852,521 Recycled Water
Pipeline
Page 171
CAPITAL PROJECT DESCRIPTION
RECYCLED WATER - RECYCLED WATER PHASE II - PUMP STATIONS
PROJECT NAME
3889
PROJECT NO.
PROJECT LOCATION MAP:
CALAVERA
PIMP STATION
PAR/ECR
POMP STATION
•D1 TANK
PUMP STATION
PROJECT LOCATION:
"D" Tanks, Palomar Airport Road and El Camino Real, and College Boulevard
north of Cannon Road.
PROJECT DESCRIPTION:
Construction of pump stations to transport reclaimed water to the following
service areas:
• "D" Tank Pump Station (384/550 Zone)
• Calavera Pump Station (550 Zone)
• PAR/ECR Pump Station (660 Zone)
PROJECT NEED:
To reduce the use of potable water by providing reclaimed water for irrigation
purposes.
FINANCING:
Purpose
Total Cost:
Estimated Cost Funding Source
$4,918,574 Recycled Water
Pumpstat
II II II fl II II II II II • •
Page 172
• 1 II II II
fi ii ii ii fi ii fi ii fi fi fi t i ri ii till ri fi fi
CIRCULATION SYSTEM PROJECTS
; I i I i I : 1 ; ! i :. . . ill
TRAFFIC SIGNAL PROJECTS
FUNDING MATRIX FOR TRAFFIC SIGNAL PROJECTS
PROJ
NO.
3369
3369
6300
3916
3902
6301
3846
3917
3899
6302
3800
6303
6304
3621
3938
3644
3935
3939
3946
3882
3406
3940
6305
FUND
NO.
33692
33693
63001
39161
39021
63011
38461
39171
38991
63021
38001
63031
63041
36211
39381
36441
39351
39391
39461
38821
34061
39401
63051
PROJECT TITLE
TRAP SIG - ALGA ROAD AND CAZADERO
TRAP SIG - AVIARA PARKWAY-POINSETTIA LANE TO EL CAMINO REAL
TRAP SIG - AVIARA PARKWAY-POINSETTIA LANE TO EL CAMINO REAL
TRAP SIG - AVIARA PKWY AND CAMINO DE LAS ONDAS- REIMB
TRAP SIG - CALLE BARCELONA AND PASEO AVELLANO
TRAP SIG - CAMINO DE LOS COCHES AND CALLE ACERVO
TRAP SIG - CAMINO DE LOS COCHES AND LA COSTA AVENUE
TRAP SIG - CAMINO VIDA ROBLE AND YARROW DRIVE
TRAP SIG - CANNON ROAD AND AVENIDA ENCINAS
TRAP SIG - CANNON ROAD AND COLLEGE BOULEVARD
TRAP SIG - CARLSBAD BLVD & TAMARACK SIGNAL REPAIRS
TRAP SIG - CARLSBAD BOULEVARD AND CHERRY AVE
TRAP SIG - CARLSBAD VILLAGE DRIVE AND GLASGOW DR
TRAP SIG - COLLEGE BOULEVARD AND CARLSBAD VILLAGE DR - Reimb
TRAP SIG - EL CAM. REAL/PLAZA/MARRON/HOSP WY
TRAP SIG - EL CAMINO REAL AND CHESTNUT SIGNAL REPAIRS
TRAP SIG - EL CAMINO REAL AND POINSETTIA LANE
TRAP SIG - EL CAMINO REAL AND TAMARACK SIGNAL REPAIRS
TRAP SIG - EL FUERTE ST AND RANCHO PANCHO
TRAP SIG - FARADAY AVE. AND CAMINO HILLS DRIVE
TRAP SIG - FARADAY AVENUE AND ORION STREET
TRAP SIG - FARADAY AVENUE AND PRIESTLY DRIVE
TRAP SIG - FARADAY AVENUE AND RUTHERFORD ROAD
TRAP SIG - LA COSTA AVENUE AND ESFERA STREET
TRAP SIG - LA COSTA AVENUE AND LEVANTE
TRAP SIG - LA COSTA AVENUE/NUEVA CASTILLA
TRAP SIG - MELROSE DRIVE AND LA COSTA AVENUE
TRAP SIG - MONROE STREET AND HOSP WAY
TRAP SIG - PALOMAR AIRPORT ROAD AND MELROSE DRIVE
TRAP SIG - PASEO DEL NORTE AND CAR COUNTRY DR
TRAP SIG - POINSETTIA LANE AND BLACKRAIL ROAD
TRAP SIG - POINSETTIA LANE AND BRIGANTINE ROAD
TRAP SIG - POINSETTIA LANE AND EL FUERTE STREET (REIMB)
TRAP SIG - POINSETTIA LANE AND SNAPDRAGON DR
TRAP SIG - RANCHO SANTA FE ROAD AND CALLE JUNIPERO
TRAP SIG - RANCHO SANTA FE ROAD AND SAN ELIJO ROAD
TRAP SIG - TAMARACK AVE. AND PONTIAC DRIVE
TRAP SIG - TAMARACK AVE. AND VALLEY STREET
TRAP SIG - TAMARACK AVENUE AND GARFIELD STREET
VIDEO DETECTION CONVERSION
FUNDING
SOURCE
GAS TAX
OTHER
GCC
GCC
GCC
GCC
PFF
PFF
PFF
PFF
IRF
GCC
GCC
PFF
TRANSNET-LOC
IRF
PFF
IRF
GCC
GCC
TIF
GAS TAX
GCC
GAS TAX
GCC
GCC
PFF
GCC
PFF
GAS TAX
GCC
GCC
PFF
GAS TAX
PFF
GCC
GCC
GCC
PFF
GAS TAX
TOTAL
BUDGET
210,000
862,649
260,000
105,000
210,000
190,000
190,000
190,000
150,000
210,000
230,000
190,000
210,000
210,000
1,311,000
206,000
204,250
141,000
190,000
190,000
289,550
303,050
190,000
190,000
210,000
190,000
190,000
210,000
250,000
210,000
210,000
190,000
210,000
190,000
210,000
124,767
210,000
190,000
210,000
1,850,00(
FUTURE YEAR BUDGET AMOUNTS
YEAR1
2006-07
YEAR 2
2007-2008
67,00(
YEAR 3
2008-2009
190,000
277,OCK
YEAR 4
2009-2010
260,000
100,000
247,000
YEARS
2010-2011
307,000
YEAR 6-10
2011-2016
210,000
210,000
190,000
210,000
190,000
210,000
190,000
190,000
190,000
190,000
210,000
190,000
210,000
190,000
435,000
BUILDOUT
2016-2021
190,000
190,000
210,000
i 1 • i » f f I si f I 11 il 11 • i i i • i • i » •
Page 173
II f I
i i li ii 11 i i i i ii i i i i t I it t i i i i i i I
CAPITAL PROJECT DESCRIPTION
CIRCULATION SYSTEM TRAFFIC SIGNALS - ALGA ROAD AND CAZADERO DRIVE
PROJECT NAME
NONE
PROJECT NO.
PROJECT LOCATION MAP:PROJECT LOCATION:
At the intersection of Alga Road and Cazadero Drive.
PROJECT DESCRIPTION:
Installation of a four-leg, fully actuated traffic signal, including a type 170
controller, 200SA local intersection control program, video detection, battery
back-up system, appurtenant signing and striping, and signal interconnect to
adjacent controllers.
PROJECT NEED:
Caltrans signal warrants have been met. The intersection is listed on the
qualification list of the City's Traffic Signal Evaluation Policy. The installation of
this traffic signal will assign the right-of-way for both motorists and pedestrians
entering and crossing at the intersection.
FINANCING:
Purpose
Design
Construction
Admin/Inspection
Total Cost =
Estimated Cost
$8,000
$190,000
$12,000
$210,000
Funding Source
Gas Tax
Gas Tax
Gas Tax
ALGACAZA
Page 174
CAPITAL PROJECT DESCRIPTION
3369
CIRCULATION SYSTEM TRAFFIC SIGNALS - AVIARA PARKWAY (POINSETTIA LANE TO EL CAMINO REAL)
PROJECT NAME
PROJECT NO.
PROJECT LOCATION MAP:PROJECT LOCATION:
At various intersections on Aviara Parkway between Poinsettia Lane and
El Camino Real.
PROJECT DESCRIPTION:
Construct traffic signals and/or make minor drainage improvements to the
following intersections with Aviara Parkway:
1. Nightshade Road - Traffic Signal
2. Tohee Lane - Traffic Signal
PROJECT NEED:
Signals needed to comply with Growth Management Standards. Traffic signals
will be installed when they are warranted. Minor street improvements are
needed to accommodate street drainage. Improvements will be constructed
when Aviara Parkway is extended north of Poinsettia Lane.
FINANCING:
Purpose
Design/Construction
Design/Construction
Total Cost =
Estimated Cost Funding Source
$862,649
$260,000
$1,122,649
Other
GCC
Original project cost estimated at $1,123,000. $763,000 expended in previous
years for construction of existing traffic signals along Aviara Parkway.
AVIATS1G
I ] I 1 1 I I 1 I 1 I 1 I 1 I I I 1 • 1 I I
Page 175
i i i II 11 i i ii
CAPITAL PROJECT DESCRIPTION
CIRCULATION SYSTEM TRAFFIC SIGNALS - AVIARA PARKWAY AND CAMINO DE LAS ONDAS
PROJECT NAME
6300
PROJECT NO.
PROJECT LOCATION MAP:PROJECT LOCATION:
Aviara Parkway and Camino de las Ondas.
PROJECT DESCRIPTION:
Installation of a fully-actuated traffic signal and appurtenant striping and
signage. Developer of North Coast Calvary Chapel (MS 04-02) will design and
construct signal and may apply for reimbursement of half the cost pursuant to a
development condition for the project.
PROJECT NEED:
Required to provide safe ingress and egress to the Mariner's Point and
North Coast Calvary Chapel developments.
FINANCING:
Purpose Estimated Cost
Construction (Reimb.) $105,000
Total Cost = $105,000
Funding Source
GCC
Aviara_0ndas Page 176
CAPITAL PROJECT DESCRIPTION
CIRCULATION SYSTEM TRAFFIC SIGNALS - CALLE BARCELONA AND PASEO AVELLANO
PROJECT NAME
NONE
PROJECT NO.
PROJECT LOCATION MAP:PROJECT LOCATION:
Intersection of Calle Barcelona and Paseo Avellano.
PROJECT DESCRIPTION:
Installation of a four-leg, fully actuated traffic signal, including a type 170
controller, 200SA local intersection control program, video detection, battery
back-up system, appurtenant signing and striping, and signal interconnect to
adjacent controllers.
PROJECT NEED:
A Caltrans traffic signal warrant has been met. The intersection is listed on the
Traffic Signal Qualification List of the City's 2004 Traffic Signal Evaluation
Policy. The installation of this traffic signal will assign the right-of-way for both
motorists and pedestrians entering and crossing at this intersection.
FINANCING:
Purpose
Design
Construction
Admin/Inspection
Total Cost =
Estimated Cost
$8,000
$190,000
$12,000
$210,000
Funding Source
GCC
GCC
GCC
CALLEBARC
Page 177
n §n f i * • • i it ii ii • i
if if i l 11 i it I t i I I I i i i I ! . :
CAPITAL PROJECT DESCRIPTION
i i i i i
3916
CIRCULATION SYSTEM TRAFFIC SIGNALS - CAMINO DE LOS COCHES AND CALLE ACERVO
PROJECT NAME
PROJECT NO.
PROJECT LOCATION MAP:
SIGNAL
.LOCATION
PROJECT LOCATION:
At the intersection of Camino De Los Coches and Calle Acervo.
PROJECT DESCRIPTION:
Installation of a three-leg, fully-actuated traffic signal, including a Type 170E
controller, 200SA local intersection control program, video detection, battery
back-up system, appurtenant signing and striping, and signal interconnect to
adjacent controllers at Camino De Los Coches and La Costa Canyon High
School Driveway and Camino De Los Coches and Rancho Santa Fe Road.
PROJECT NEED:
This intersection meets two of the eleven Caltrans Traffic Signal Warrants
(Warrant #9, Four Hour Volume, and Warrant #11, Peak Hour Volume).
There have been four accidents in a 12-month period ending March 2003.
Caltrans considers five accidents or more during a 12-month period to be
significant.
FINANCING:
Purpose
Design
Construction
Admin/Inspection
Total Cost =
Estimated Cost
$8,000
$161,000
$21,000
$190,000
Funding Source
GCC
GCC
GCC
Annual Operating Cost = $5,000
CDLC CA Page 178
CAPITAL PROJECT DESCRIPTION
CIRCULATION SYSTEM TRAFFIC SIGNALS - CAMINO DE LOS COCHES AND LA COSTA AVENUE
PROJECT NAME
NONE
PROJECT NO.
PROJECT LOCATION MAP:
SIGNAL
LOCATION
PROJECT LOCATION:
Intersection of Camino de los Coches and La Costa Avenue.
PROJECT DESCRIPTION:
Installation of a four-leg, fully actuated traffic signal, including a type 170
controller, 200SA local intersection control program, video detection, battery
back-up system, appurtenant signing and striping, and signal interconnect to
adjacent controllers.
PROJECT NEED:
Needed to comply with Growth Management Standards. Installation will occur
when traffic signal warrants are met. The installation of this traffic signal will
assign the right-of-way for both motorists and pedestrians entering and
crossing at the intersection.
FINANCING:
Purpose
Design
Construction
Admin/Inspection
Total Cost =
Estimated Cost Funding Source
$8,000
$170,000
$12,000
$190,000
PFF
PFF
PFF
CAMINODE
II 11 II II II II II II tl II II
Page 179
i i 1 I I I I 1 i i i i I i t
CAPITAL PROJECT DESCRIPTION
NONE
CIRCULATION SYSTEM TRAFFIC SIGNALS - CAMINO VIDA ROBLE AND YARROW DRIVE
PROJECT NAME
PROJECT NO.
PROJECT LOCATION MAP:
SIGNAL
LOCATION
PROJECT LOCATION:
Intersection of Camino Vida Roble and Yarrow Drive.
PROJECT DESCRIPTION:
Installation of a three-leg, fully actuated traffic signal, including a type 170
controller, 200SA local intersection control program, video detection, battery
back-up system, appurtenant signing and striping, and signal interconnect to
adjacent controllers.
PROJECT NEED:
Needed to comply with Growth Management Standards and traffic signal
warrants. Installation will occur when traffic signal warrants are met.
The installation of this traffic signal will assign the right-of-way for both
motorists and pedestrians entering and crossing at the intersection.
FINANCING:
Purpose
Design
Construction
Admin/Inspection
Total Cost =
Estimated Cost Funding Source
$8,000
$170,000
$12,000
$190,000
PFF
PFF
PFF
CAMINOYA
Page 180
CAPITAL PROJECT DESCRIPTION
CIRCULATION SYSTEM TRAFFIC SIGNALS - CANNON ROAD AND AVENIDA ENCINAS
PROJECT NAME
3902
PROJECT NO.
PROJECT LOCATION MAP:
AIRPORT RD.
V
PROJECT LOCATION:
Intersection of Cannon Road and Avenida Encinas, immediately west of
Interstate 5.
PROJECT DESCRIPTION:
Installation of a 5-phase, fully actuated traffic signal, including a Type 170
controller, 176 intersection control program and minor intersection
improvements.
PROJECT NEED:
Needed to comply with Growth Management Standards. Installation will occur
when traffic signal warrants are met.
FINANCING:
Purpose Estimated Cost Funding Source
Design/Construction $150,000 PFF
Total Cost = $150,000
Page 181CANNON1
ii ii ii ii it it ii ii ti f i f I f I PI t i ii •! ii 11 • i
i i i i I I I i i I I t I II II II i 1 I I
CAPITAL PROJECT DESCRIPTION
NONE
CIRCULATION SYSTEM TRAFFIC SIGNALS - CANNON ROAD AND COLLEGE BOULEVARD PROJECT NO
PROJECT NAME
PROJECT LOCATION MAP:PROJECT LOCATION:
Intersection of Cannon Road and College Boulevard.
PROJECT DESCRIPTION:
Installation of a four-leg, fully actuated traffic signal, including a type 170
controller, 200SA local intersection control program, video detection, battery
back-up system, appurtenant signing and striping, and signal interconnect to
adjacent controllers.
PROJECT NEED:
Needed to comply with Growth Management Standards. Installation will occur
when traffic signal warrants are met. The installation of this traffic signal will
assign the right-of-way for both motorists and pedestrians entering and
crossing at the intersection.
FINANCING:
Purpose
Design
Construction
Admin/Inspection
Total Cost =
Estimated Cost Funding Source
$8,000
$190,000
$12,000
$210,000
PFF
PFF
PFF
CANNON2 Page 182
CAPITAL PROJECT DESCRIPTION
CIRCULATION SYSTEM TRAFFIC SIGNALS - CARLSBAD BOULEVARD AND
TAMARACK AVENUE SIGNAL REPAIRS
PROJECT NAME
6301
PROJECT NO.
PROJECT LOCATION MAP:PROJECT LOCATION:
Carlsbad Boulevard and Tamarack Avenue.
PROJECT DESCRIPTION:
Remove and replace all traffic signal equipment including signal
controller/cabinet, signal poles and mast arms, vehicle and signal indications,
conduit and conductors. Existing electrical service cabinet is adequate and
does not need to be replaced. Install video detection and UPS battery back-up
systems.
PROJECT NEED:
Due to age of equipment and proximity to ocean, the existing signal equipment
is badly corroded and in need of replacement. Underground conduit is
corroded and overfilled, making repair/maintenance work difficult.
FINANCING:
Purpose
Design
Construction
Admin/Inspection
Total Cost =
Estimated Cost
$5,000
$201,500
$23,500
$230,000
Funding Source
IRF
IRF
IRF
Cbad_Tam Page 183
• ri t i it ii ti ti ii it ii ii it §1 ii 11 11 t i t i
II II II
CAPITAL PROJECT DESCRIPTION
3846
CIRCULATION SYSTEM TRAFFIC SIGNALS - CARLSBAD BOULEVARD AND CHERRY AVENUE
PROJECT NAME
PROJECT NO.
PROJECT LOCATION MAP:
PROJECT
SITE
PACIFIC
OCEAN
PROJECT LOCATION:
Intersection of Carlsbad Boulevard and Cherry Avenue.
PROJECT DESCRIPTION:
Installation of a three-leg, fully actuated traffic signal, including a type 170
controller, 200SA local intersection control program, video detection, battery
back-up system, appurtenant signing and striping, and signal interconnect to
adjacent controllers.
PROJECT NEED:
Caltrans traffic signal warrants have been met. The intersection is listed on the
qualification list of the City's Traffic Signal Evaluation Policy. The installation of
this traffic signal will assign the right-of-way for both motorists and pedestrians
entering and crossing at the intersection.
FINANCING:
Purpose
Design
Construction
Admin/Inspection
Total Cost =
Estimated Cost Funding Source
$8,000
$170,000
$12,000
$190,000
GCC
GCC
GCC
CBCherry
Page 184
CAPITAL PROJECT DESCRIPTION
3917
CIRCULATION SYSTEM TRAFFIC SIGNALS - CARLSBAD VILLAGE DRIVE AND GLASGOW DRIVE
PROJECT NAME
PROJECT NO.
PROJECT LOCATION MAP:
cmoFogatisiDL
OF CARLSBAD
SIGNAL
LOCATION
CVD_glas
ii ii ii ii ii i i r t
PROJECT LOCATION:
At the intersection of Carlsbad Village Drive and Glasgow Drive.
PROJECT DESCRIPTION:
Installation of a four-leg, fully-actuated traffic signal, including a Type 170E
controller, 200SA local intersection control program, video detection,
battery back-up system, appurtenant signing and striping, and signal
interconnect to adjacent controllers at Carlsbad Village Drive (CVD)
and Tamarack Avenue and Carlsbad Village Drive and College Boulevard.
PROJECT NEED:
The adjacent intersection to the west (CVD/Tamarack) is currently signalized
and the adjacent intersection to the east (CVD/College) will be signalized upon
the completion of College Boulevard south of CVD. Due to the increase in
vehicular volume, Caltrans Traffic Signal Warrant #7 (Systems Warrant)
is projected to be satisfied after the aforementioned extension of
College Boulevard.
FINANCING:
Purpose
Design
Construction
Admin/Inspection
Total Cost =
Estimated Cost
$8,000
$180,000
$22,000
$210,000
Funding Source
GCC
GCC
GCC
Annual Operating Cost: $5,000
Page 185
91 lltltltllllllllltltl
II 11 II ! •: - r i i I i i i i , i . "•
CAPITAL PROJECT DESCRIPTION
i i i
NONE
CIRCULATION SYSTEM TRAFFIC SIGNALS - COLLEGE BOULEVARD AND CARLSBAD VILLAGE DRIVE
PROJECT NAME
PROJECT NO.
PROJECT LOCATION MAP:PROJECT LOCATION:
Intersection of College Boulevard and Carlsbad Village Drive.
PROJECT DESCRIPTION:
Installation of a four-leg, fully actuated traffic signal, including a type 170
controller, 200SA local intersection control program, video detection, battery
back-up system, appurtenant signing and striping, and signal interconnect to
adjacent controllers.
PROJECT NEED:
Needed to comply with Growth Management Standards. Installation will occur
when traffic signal warrants are met. The installation of this traffic signal will
assign the right-of-way for both motorists and pedestrians entering and
crossing at the intersection.
FINANCING:
Purpose
Design
Construction
Admin/Inspection
Total Cost =
Estimated Cost Funding Source
$8,000
$190,000
$12,000
$210,000
PFF
PFF
PFF
COL CVD Page 186
CAPITAL PROJECT DESCRIPTION
CIRCULATION SYSTEM TRAFFIC SIGNALS - EL CAMINO REAL / PLAZA DRIVE /
MARRON ROAD / HOSP WAY
PROJECT NAME
3899
PROJECT NO.
PROJECT LOCATION MAP:
SIGNAL
LOCATION
ECRREHAB
II II
PROJECT LOCATION:
Signalized intersections of El Camino Real and Plaza Drive, El Camino Real
and Macron Road, and El Camino Real and Hosp Way.
PROJECT DESCRIPTION:
Design and rebuild existing signalized intersections to include all signal
appurtenances and to meet ADA requirements. Repair concrete and rebuild a
portion of Marron Road east of El Camino Real.
PROJECT NEED:
Underground signal facilities at this location have deteriorated to the point
where conductors can no longer be pulled through the system. This project will
reduce the need for future maintenance and restore the ability for maintenance
crews to make future repairs should equipment become damaged or
malfunction. Pull boxes and signal poles require location for installation of ADA
pedestrian ramps. Replacing a cross-gutter in Marron Road will improve the
driving conditions.
FINANCING:
Purpose
Design
Construction
Total Cost =
Estimated Cost
$70,000
$1,241,000
$1,311,000
Funding Source
TransNet-Local
TransNet-Local
Page 187
• i ii ii r i • i mm ti » i
I i I i i i i iiifillliiifiili i i i i i il ii
CAPITAL PROJECT DESCRIPTION
6302
CIRCULATION SYSTEM TRAFFIC SIGNALS - EL CAMINO REAL AND
CHESTNUT AVENUE SIGNAL REPAIRS
PROJECT NAME
PROJECT NO.
PROJECT LOCATION MAP:PROJECT LOCATION:
El Camino Real and Chestnut Avenue.
PROJECT DESCRIPTION:
Remove and replace all traffic signal equipment including signal
controller/cabinet, electrical service enclosure, vehicle and signal indications,
conduit and conductors. Install video detection and UPS battery back-up
systems. Minor sidewalk repairs on northeast (including retaining wall)
and southeast corners to provide minimum pedestrian clearance per ADA
requirements. Existing poles/mast arms to remain.
PROJECT NEED:
Due to age of equipment, the existing signal equipment is badly corroded and
in need of replacement. Underground conduit is corroded and overfilled,
making repair/maintenance work difficult and also needs to be replaced.
FINANCING:
Purpose
Design
Construction
Admin/Inspection
Total Cost =
Estimated Cost Funding Source
$20,000
$167,500
$18,500
$206,000
IRF
IRF
IRF
Page 188
ECFLChest
CAPITAL PROJECT DESCRIPTION
CIRCULATION SYSTEM TRAFFIC SIGNALS - EL CAMINO REAL AND POINSETTIA LANE
PROJECT NAME
3800
PROJECT NO.
PROJECT LOCATION MAP:
ECR3
I I I I if
PROJECT LOCATION:
Intersection of El Camino Real and Poinsettia Lane.
PROJECT DESCRIPTION:
Installation of a four-leg, fully actuated traffic signal, including a type 170
controller, 200SA local intersection control program, video detection, battery
back-up system, appurtenant signing and striping, and signal interconnect to
adjacent controllers.
PROJECT NEED:
Needed to comply with Growth Management Standards. The installation of this
traffic signal will assign the right-of-way for both motorists and pedestrians
entering and crossing at the intersection.
FINANCING:
Purpose
Design
Construction
Admin/Inspection
Total Cost =
Estimated Cost Funding Source
$8,000
$180,000
$16,250
$204,250
PFF
PFF
PFF
Page 189
• I II I:. | |l II II II
i i i I i !1 1 i I I I i i 1 i I i t ii i i i i i i i i
CAPITAL PROJECT DESCRIPTION
CIRCULATION SYSTEM TRAFFIC SIGNALS - EL CAMINO REAL AND
TAMARACK AVENUE SIGNAL REPAIRS
PROJECT NAME
6303
PROJECT NO.
PROJECT LOCATION MAP:PROJECT LOCATION:
El Camino Real and Tamarack Avenue.
PROJECT DESCRIPTION:
Remove and replace all underground conduit, conductors and pull boxes.
Install video detection system and UPS battery back-up system.
PROJECT NEED:
Due to age of equipment, underground conduit is corroded and overfilled,
making repairs/maintenance work difficult. Video detection and battery back-up
system will be installed to bring signal operations up-to-date.
FINANCING:
Purpose
Design
Construction
Admin/Inspection
Total Cost =
Estimated Cost Funding Source
$4,000
$122,400
$14,600
$141,000
IRF
IRF
IRF
ECFLJam
Page 190
CAPITAL PROJECT DESCRIPTION
CIRCULATION SYSTEM TRAFFIC SIGNALS - EL FUERTE AND RANCHO PANCHO
PROJECT NAME
NONE
PROJECT NO.
PROJECT LOCATION MAP:
SIGNAL
LOCATION
PROJECT LOCATION:
At the intersection of El Fuerte Street and Rancho Pancho.
PROJECT DESCRIPTION:
Installation of a three-leg, fully actuated traffic signal, including a controller and
intersection control program, video detection, battery back-up, signal
interconnect conduit, and appurtenant striping and signing.
PROJECT NEED:
The intersection is listed on the Traffic Signal Qualification List of the City's
2006 Traffic Signal Evaluation Policy. The installation of this traffic signal will
assign the right-of-way for both motorists and pedestrians.
FINANCING:
Purpose
Design
Construction
Inspection
Total Cost =
Estimated Cost
$8,000
$171,000
$11,000
$190,000
Funding Source
GCC
GCC
GCC
ELFUERTE
II II II II II II II II II II II « 1
Page 191
II II II II II 11
i i i i ii i I I i i I i i i i
CAPITAL PROJECT DESCRIPTION
NONE
CIRCULATION SYSTEM TRAFFIC SIGNALS - FARADAY AVENUE AND CAMINO HILLS DRIVE
PROJECT NAME
PROJECT NO.
PROJECT LOCATION MAP:
AIRPORT
PROJECT LOCATION:
Intersection of Faraday Avenue and Camino Hills Drive.
PROJECT DESCRIPTION:
Installation of a three-leg, fully actuated traffic signal, including a type 170
controller, 200SA local intersection control program, video detection, battery
back-up system, appurtenant signing and striping, and signal interconnect to
adjacent controllers.
PROJECT NEED;
A Caltrans traffic signal warrant has been met. The intersection is listed on the
Traffic Signal Qualification List of the City's 2004 Traffic Signal Evaluation
Policy. The installation of this traffic signal will assign the right-of-way for both
motorists and pedestrians entering and crossing at this intersection.
FINANCING:
Purpose
Design
Construction
Admin/Inspection
Total Cost =
Estimated Cost
$8,000
$170,000
$12,000
$190,000
Funding Source
GCC
GCC
GCC
Faraday
Page 192
CAPITAL PROJECT DESCRIPTION
CIRCULATION SYSTEM TRAFFIC SIGNALS - FARADAY AVENUE AND ORION STREET
PROJECT NAME
6304
PROJECT NO.
PROJECT LOCATION MAP:PROJECT LOCATION:
At the intersection of the above named streets.
PROJECT DESCRIPTION:
Installation of a four-leg, fully actuated traffic signal, including a type 170
controller, 200SA local intersection control program, video detection, battery
back-up system, appurtenant signing and striping, and signal interconnect to
adjacent controllers.
PROJECT NEED:
Needed to comply with Growth Management Standards. The installation of this
traffic signal will assign the right-of-way for both motorists and pedestrians
entering and crossing at the intersection.
FINANCING:
Purpose
Design
Construction
Admin/Inspection
Total Cost =
Estimated Cost Funding Source
$8,000
$269,500
$12,000
$289,500
TIP
TIP
TIP
FARAORIO
i i i i i i • i r-i * • f i ii ii ri • i 11 11 11 11 it
Pa96 193
• « • '
i i I 1 I 1 i 1 I i I i I I I I 1 I I t : L i
CAPITAL PROJECT DESCRIPTION
i i i i i i ii it
3621
CIRCULATION SYSTEM TRAFFIC SIGNALS - FARADAY AVENUE AND PRIESTLY DRIVE
PROJECT NAME
PROJECT NO.
PROJECT LOCATION MAP:PROJECT LOCATION:
At the intersection of Faraday Avenue and Priestly Drive.
PROJECT DESCRIPTION:
Installation of a three-leg, fully actuated traffic signal, including a type 170
controller, 200SA local intersection control program, video detection, battery
back-up system, appurtenant signing and striping, and signal interconnect to
adjacent controllers.
PROJECT NEED:
Caltrans signal warrants have been met. The intersection is listed on the
qualification list of the City's Traffic Signal Evaluation Policy. The installation of
this traffic signal will assign the right-of-way for both motorists and pedestrians
entering and crossing at the intersection.
FINANCING:
Purpose
Design
Construction
Admin/Inspection
Total Cost =
Estimated Cost
$8,000
$273,050
$22,000
$303,050
Funding Source
Gas Tax
Gas Tax
Gas Tax
FDYPRIES Page 194
CAPITAL PROJECT DESCRIPTION
NONE
CIRCULATION SYSTEM TRAFFIC SIGNALS - FARADAY AVENUE AND RUTHERFORD ROAD
PROJECT NAME
PROJECT NO.
PROJECT LOCATION MAP:
SIGNAL
LOCATION
Faruthfd
iiii ri mm
PROJECT LOCATION:
At the intersection of Faraday Avenue and Rutherford Road.
PROJECT DESCRIPTION:
Installation of a four-leg, fully actuated traffic signal, including a type 170
controller, 200SA local intersection control program, video detection, battery
back-up system, appurtenant signing and striping, and signal interconnect to
adjacent controllers.
PROJECT NEED:
Caltrans traffic signal warrants have been met. The intersection is listed on the
qualification list of the City's Traffic Signal Evaluation Policy. The installation of
this traffic signal will assign the right-of-way for both motorists and pedestrians
entering and crossing at the intersection.
FINANCING:
Purpose
Design
Construction
Admin/Inspection
Total Cost =
Estimated Cost Funding Source
$8,000
$170,000
$12,000
$190,000
GCC
GCC
GCC
m-m mm • i ii ii • t i t i ii a i
Page 195
ii • i
i i 11 II I i I t I i i i i i | f i i i i I t *
CAPITAL PROJECT DESCRIPTION
i i if i I i i
NONE
CIRCULATION SYSTEM TRAFFIC SIGNALS - LA COSTA AVENUE AND ESFERA STREET
PROJECT NAME
PROJECT NO.
PROJECT LOCATION MAP:PROJECT LOCATION:
La Costa Avenue and Esfera Street.
PROJECT DESCRIPTION:
Installation of a three-leg, fully actuated traffic signal, including a type
170 controller, 200SA local intersection control program, video detection,
battery back-up system, appurtenant signing and striping, and signal
interconnect to adjacent controllers.
PROJECT NEED:
The installation of this traffic signal will assign the right-of-way for both
motorists and pedestrians entering and crossing at the intersection.
FINANCING:
Purpose
Design
Construction
Admin/Inspection
Total Cost =
Estimated Cost
$8,000
$170,000
$12,000
$190,000
Funding Source
GCC
GCC
GCC
La costa Page 196
CAPITAL PROJECT DESCRIPTION
CIRCULATION SYSTEM TRAFFIC SIGNALS - LA COSTA AVENUE AND LEVANTE STREET
PROJECT NAME
3938
PROJECT NO.
PROJECT LOCATION MAP:
Lacosta_2
I I I 1
PROJECT LOCATION:
La Costa Avenue and Levante Street.
PROJECT DESCRIPTION:
Installation of a three-leg, fully actuated traffic signal, including a type
170 controller, 200SA local intersection control program, video detection,
battery back-up system, appurtenant signing and striping, and signal
interconnect to adjacent controllers.
PROJECT NEED:
The installation of this traffic signal will assign the right-of-way for both
motorists and pedestrians entering and crossing at the intersection.
FINANCING:
Purpose
Design
Construction
Admin/Inspection
Total Cost *
Estimated Cost
$8,000
$180,000
$22,000
$210,000
Funding Source
GCC
GCC
GCC
IIIIIIIIIIIIVIEIVIII * I II II
Page 197
I I II VI
I I i f 1 ! 1 ! , i : 1 i 1 i I i I I ! i :
CAPITAL PROJECT DESCRIPTION
NONE
CIRCULATION SYSTEM TRAFFIC SIGNALS - LA COSTA AVENUE AND NUEVA CASTILLA WAY
PROJECT NAME
PROJECT NO.
PROJECT LOCATION MAP:
SIGNAL
LOCATION
PROJECT LOCATION:
Intersection of La Costa Avenue and Nueva Castilla Way.
PROJECT DESCRIPTION:
Installation of a four-leg, fully actuated traffic signal, including a type 170
controller, 200SA local intersection control program, video detection, battery
back-up system, appurtenant signing and striping, and signal interconnect to
adjacent controllers.
PROJECT NEED:
Caltrans traffic signal warrants have been met. The intersection is listed on the
qualification list of the City's Traffic Signal Evaluation Policy. The installation of
this traffic signal will assign the right-of-way for both motorists and pedestrians
entering and crossing at the intersection.
FINANCING:
Purpose
Design
Construction
Admin/Inspection
Total Cost =
Estimated Cost Funding Source
$8,000
$170,000
$12,000
$190,000
GCC
GCC
GCC
LCANueva Page 198
CAPITAL PROJECT DESCRIPTION
CIRCULATION SYSTEM TRAFFIC SIGNALS - MELROSE DRIVE AND LA COSTA AVENUE
PROJECT NAME
NONE
PROJECT NO.
PROJECT LOCATION MAP:
SIGNAL
LOCATION
PROJECT LOCATION:
Intersection of Melrose Drive and La Costa Avenue.
PROJECT DESCRIPTION:
Installation of a four-leg, fully actuated traffic signal, including a type 170
controller, 200SA local intersection control program, video detection, battery
back-up system, appurtenant signing and striping, and signal interconnect to
adjacent controllers.
PROJECT NEED:
Needed to comply with Growth Management Standards. The installation of this
traffic signal will assign the right-of-way for both motorists and pedestrians
entering and crossing at the intersection.
FINANCING:
Purpose
Design
Construction
Admin/Inspection
Total Cost =
Estimated Cost Funding Source
$8,000
$170,000
$12,000
$190,000
PFF
PFF
PFF
MELROSE Page 199
*« mm ri
t i i 1 I 1 I )J t I i i t t t J i i * i i ? ; :
CAPITAL PROJECT DESCRIPTION
i i ll k i ti
NONE
CIRCULATION SYSTEM TRAFFIC SIGNALS - MONROE STREET AND HOSP WAY
PROJECT NAME
PROJECT NO.
PROJECT LOCATION MAP:
SIGNAL
LOCATION
PROJECT LOCATION:
Intersection of Monroe Street and Hosp Way.
PROJECT DESCRIPTION:
Installation of a four-leg, fully actuated traffic signal, including a type 170
controller, 200SA local intersection control program, video detection, battery
back-up system, appurtenant signing and striping, and signal interconnect to
adjacent controllers.
PROJECT NEED:
A Caltrans traffic signal warrant has been met. The intersection is listed on the
Traffic Signal Qualification List of the City's 2004 Traffic Signal Evaluation
Policy. The installation of this traffic signal will assign the right-of-way for both
motorists and pedestrians entering and crossing at this intersection.
FINANCING:
Purpose
Design
Construction
Admin/Inspection
Total Cost =
Estimated Cost
$8,000
$190,000
$12,000
$210,000
Funding Source
GCC
GCC
GCC
Monroe
Page 200
CAPITAL PROJECT DESCRIPTION
3644
CIRCULATION SYSTEM TRAFFIC SIGNALS - PALOMAR AIRPORT ROAD AND MELROSE DRIVE
PROJECT NAME
PROJECT NO.
PROJECT LOCATION MAP:
SIGNAL
LOCATION
PARMELRO
II II • I VI
PROJECT LOCATION:
Intersection of Palomar Airport Road and Melrose Drive.
PROJECT DESCRIPTION:
Installation of an 8-phase, fully actuated traffic signal, including a Type 170
controller and 176 intersection control program. Modify existing traffic signal to
accommodate construction of north leg of Melrose Avenue.
PROJECT NEED:
Needed to comply with Growth Management Standards.
FINANCING:
Estimated Cost Funding SourcePurpose
Design/Construction
Admin/Inspection
Total Cost =
$200,000
$50,000
$250,000
PFF
PFF
Page 201
9 1 PI • 1 11 f I 11 • • • 1
i 1 i 1 I i i t j
CAPITAL PROJECT DESCRIPTION
3935
CIRCULATION SYSTEM TRAFFIC SIGNALS - PASEO DEL NORTE AND CAR COUNTRY DRIVE
PROJECT NAME
PROJECT NO.
PROJECT LOCATION MAP:
RD.
PROJECT LOCATION:
At the intersection of Paseo Del Norte and Car Country Drive.
PROJECT DESCRIPTION:
Installation of a three-leg, fully actuated traffic signal, including a type 170
controller, 200SA local intersection control program, video detection, battery
back-up system, appurtenant signing and striping, and signal interconnect to
adjacent controllers.
PROJECT NEED:
Caltrans signal warrants have been met. The intersection is listed on the
qualification list of the City's 2004 Traffic Signal Evaluation Policy.
The installation of this traffic signal will assign the right-of-way for both
motorists and pedestrians entering and crossing at the intersection.
FINANCING:
Purpose
Design
Construction
Admin/Inspection
Estimated Cost
$8,000
$180,000
$22,000
Funding Source
Gas Tax
Gas Tax
Gas Tax
Total Cost =
Annual Operating Cost: = $5,000
$210,000
PDN_CCDR Page 202
CAPITAL PROJECT DESCRIPTION
CIRCULATION SYSTEM TRAFFIC SIGNALS - POINSETTIA LANE AND BLACK RAIL ROAD
PROJECT NAME
3939
PROJECT NO.
PROJECT LOCATION MAP:
Poin_brr
1111
PROJECT LOCATION:
At the intersection of Poinsettia Lane and Black Rail Road.
PROJECT DESCRIPTION:
Installation of a four-leg, fully actuated traffic signal, including a type 170
controller, 200SA local intersection control program, video detection, battery
back-up system, appurtenant signing and striping, and signal interconnect to
adjacent controllers at Poinsettia Lane and Aviara Parkway and Poinsettia Lane
and Ambrosia Lane.
PROJECT NEED;
Future traffic on Poinsettia Lane will increase once the roadway extends from
its current terminus at Black Rail Road eastward to El Camino Real, thereby
necessitating the installation of a traffic signal at this location. The installation of
this traffic signal will assign the right-of-way for both motorists and pedestrians
entering and crossing at the intersection.
FINANCING:
Purpose
Design
Construction
Admin/Inspection
Estimated Cost
$8,000
$180,000
$22,000
Funding Source
GCC
GCC
GCC
Total Cost =
Annual Operating Cost: = $5,000
$210,000
II II II t 1 f 1 • i ii ri i i IF! n • i
Page 203
• • a * •
i 1 i i i i
CAPITAL PROJECT DESCRIPTION
CIRCULATION SYSTEM TRAFFIC SIGNALS - POINSETTIA LANE AND BRIGANTINE ROAD
PROJECT NAME
NONE
PROJECT NO.
PROJECT LOCATION MAP:PROJECT LOCATION:
Intersection of Poinsettia Lane and Brigantine Road.
PROJECT DESCRIPTION:
Installation of a three-leg, fully actuated traffic signal, including a type 170
controller, 200SA local intersection control program, video detection, battery
back-up system, appurtenant signing and striping, and signal interconnect to
adjacent controllers.
PROJECT NEED;
Required to accommodate the safe and efficient flow of traffic from Brigantine
Drive onto Poinsettia Lane which is classified as a major arterial in the City's
Circulation Element. The need for the signal is created by the development of
adjacent properties. Early developing properties which do not trigger the
construction of the signal are required to contribute a fair share contribution of
the total cost to install the traffic signal.
FINANCING:
Purpose
Design
Construction
Admin/Inspection
Total Cost =
Estimated Cost
$8,000
$170,000
$12,000
$190,000
Funding Source
GCC
GCC
GCC
Poin_brig Page 204
CAPITAL PROJECT DESCRIPTION
CIRCULATION SYSTEM TRAFFIC SIGNALS - POINSETTIA LANE AND EL FUERTE STREET
PROJECT NAME
3946
PROJECT NO.
PROJECT LOCATION MAP:PROJECT LOCATION:
Intersection of Poinsettia Lane and El Fuerte Street.
PROJECT DESCRIPTION:
Installation of a four-leg, fully actuated traffic signal, including a type 170
controller, 200SA local intersection control program, video detection, battery
back-up system, appurtenant signing and striping, and signal interconnect to
adjacent controllers.
PROJECT NEED:
Needed to comply with Growth Management Standards. The installation of this
traffic signal will assign the right-of-way for both motorists and pedestrians
entering and crossing at the intersection.
FINANCING:
Purpose
Design
Construction
Admin/Inspection
Estimated Cost Funding Source
$8,000
$180,000
$22,000
PFF
PFF
PFF
Total Cost = $210,000
Annual Operating Cost: = $5,000
POINSET1
ii ii ii ii vi fi 11 ri 11 PI ii PI
Page 205
ii ii i 11
i i i 1 i l I r f ! i t i t i I I i i I
CAPITAL PROJECT DESCRIPTION
CIRCULATION SYSTEM TRAFFIC SIGNALS - POINSETTIA LANE AND SNAPDRAGON DRIVE
PROJECT NAME
3882
PROJECT NO.
PROJECT LOCATION MAP:
SIGNAL
LOCATION
PROJECT LOCATION:
At the intersection of Poinsettia Lane and Snapdragon Drive.
PROJECT DESCRIPTION:
Installation of a three-leg, fully actuated traffic signal, including a type 170
controller, 200SA local intersection control program, video detection, battery
back-up system, appurtenant signing and striping, and signal interconnect to
adjacent controllers.
PROJECT NEED;
Caltrans signal warrants have been met. The intersection is listed on the
qualification list of the City's 2004 Traffic Signal Evaluation Policy.
The installation of this traffic signal will assign the right-of-way for both
motorists and pedestrians entering and crossing at the intersection.
FINANCING:
Purpose
Design
Construction
Admin/Inspection
Estimated Cost
$8,000
$170,000
$12,000
Funding Source
Gas Tax
Gas Tax
Gas Tax
Total Cost =
Annual Operating Cost: = $5,000
$190,000
POINSNAP Page 206
CAPITAL PROJECT DESCRIPTION
CIRCULATION SYSTEM TRAFFIC SIGNALS - RANCHO SANTA FE ROAD AND CALLE JUNIPERO
(FORMERLY MELROSE DRIVE SOUTH)
PROJECT NAME
NONE
PROJECT NO.
PROJECT LOCATION MAP:
RSFMELRO
ii ii ii • i IF
PROJECT LOCATION:
Intersection of Rancho Santa Fe Road and future Calle Junipero, formerly
Melrose Drive South.
PROJECT DESCRIPTION:
Installation of a three-leg, fully actuated traffic signal, including a type 170
controller, 200SA local intersection control program, video detection, battery
back-up system, appurtenant signing and striping, and signal interconnect to
adjacent controllers.
PROJECT NEED:
Needed to comply with Growth Management Standards. The installation of this
traffic signal will assign the right-of-way for both motorists and pedestrians
entering and crossing at the intersection.
FINANCING:
Purpose
Design
Construction
Admin/Inspection
Total Cost =
Estimated Cost Funding Source
$8,000
$190,000
$12,000
$210,000
PFF
PFF
PFF
Page 207
mm i i ii 11 ii mm ii i •K I
iiiitliliiifiiiiiitiiit!
CAPITAL PROJECT DESCRIPTION
i J i i i 1 i i 4 i
3406
CIRCULATION SYSTEM TRAFFIC SIGNALS - RANCHO SANTA FE ROAD AND SAN ELIJO ROAD PROJECT NO.
(FORMERLY QUESTHAVEN ROAD)
PROJECT NAME
PROJECT LOCATION MAP:PROJECT LOCATION:
Intersection of Rancho Santa Fe Road and San Elijo Road, formerly
Questhaven Road.
PROJECT DESCRIPTION:
Installation of a three-leg, fully actuated traffic signal, including a type 170
controller, 200SA local intersection control program, video detection, battery
back-up system, appurtenant signing and striping, and signal interconnect to
adjacent controllers.
The City of San Marcos is responsible for 1/3 share of this signal. Staff will
pursue a cost sharing agreement with the City of San Marcos.
PROJECT NEED:
Needed to comply with Growth Management Standards. The installation of this
traffic signal will assign the right-of-way for both motorists and pedestrians
entering and crossing at the intersection.
FINANCING:
Purpose
Construction
Total Cost =
Estimated Cost
$124,767
$124,767
Funding Source
GCC
RSFQUEST
Page 208
CAPITAL PROJECT DESCRIPTION
CIRCULATION SYSTEM TRAFFIC SIGNALS - TAMARACK AVENUE AND PONTIAC DRIVE
PROJECT NAME
3940
PROJECT NO.
PROJECT LOCATION MAP:PROJECT LOCATION:
Intersection of Tamarack Avenue and Pontiac Drive.
PROJECT DESCRIPTION:
Installation of a three-leg, fully actuated traffic signal, including a type 170
controller, 200SA local intersection control program, video detection, battery
back-up system, appurtenant signing and striping, and signal interconnect to
adjacent controllers.
PROJECT NEED:
A Caltrans traffic signal warrant has been met. The intersection is listed on the
Traffic Signal Qualification List of the City's 2004 Traffic Signal Evaluation
Policy. The installation of this traffic signal will assign the right-of-way for both
motorists and pedestrians entering and crossing at this intersection.
FINANCING:
Purpose
Design
Construction
Admin/Inspection
Total Cost =
Annual Operating Cost = $5,000
Estimated Cost
$8,000
$180,000
$22,000
$210,000
Funding Source
GCC
GCC
GCC
Tam&pont Page 209
II 11 II II II II II II II II II • 1 II II II II II II II
i i f i i i t
CAPITAL PROJECT DESCRIPTION
CIRCULATION SYSTEM TRAFFIC SIGNALS - TAMARACK AVENUE AND VALLEY STREET
PROJECT NAME
NONE
PROJECT NO.
PROJECT LOCATION MAP:PROJECT LOCATION:
Intersection of Tamarack Avenue and Valley Street.
PROJECT DESCRIPTION:
Installation of a four-leg, fully actuated traffic signal, including a type 170
controller, 200SA local intersection control program, video detection, battery
back-up system, appurtenant signing and striping, and signal interconnect to
adjacent controllers.
PROJECT NEED:
A Caltrans traffic signal warrant has been met. The intersection is listed on the
Traffic Signal Qualification List of the City's 2004 Traffic Signal Evaluation
Policy. The installation of this traffic signal will assign the right-of-way for both
motorists and pedestrians entering and crossing at this intersection. This is an
elementary school pedestrian crossing.
FINANCING:
Purpose
Design
Construction
Admin/Inspection
Total Cost =
Estimated Cost
$8,000
$170,000
$12,000
$190,000
Funding Source
GCC
GCC
GCC
Tarn vail Page 210
CAPITAL PROJECT DESCRIPTION
NONE
CIRCULATION SYSTEM TRAFFIC SIGNALS - TAMARACK AVENUE AND GARFIELD STREET
PROJECT NAME
PROJECT NO.
PROJECT LOCATION MAP:
SIGNAL
LOCATION
PROJECT LOCATION:
Intersection of Tamarack Avenue and Garfield Street.
PROJECT DESCRIPTION:
Installation of a four-leg, fully actuated traffic signal, including a type 170
controller, 200SA local intersection control program, video detection, battery
back-up system, appurtenant signing and striping, and signal interconnect to
adjacent controllers.
PROJECT NEED:
Needed to meet Growth Management Standards and future traffic signal
warrants. The installation of this traffic signal will assign the right-of-way for
both motorists and pedestrians entering and crossing at the intersection.
FINANCING:
Purpose
Design
Construction
Admin/Inspection
Total Cost =
Estimated Cost Funding Source
$8,000
$190,000
$12,000
$210,000
PFF
PFF
PFF
TAMGAR
11 II 11 II f 1 f 1 f I I I I 1r i r i • i • i
Page 211
t Rl 11 i • § 1 i 1
i t i
CAPITAL PROJECT DESCRIPTION
CIRCULATION SYSTEM TRAFFIC SIGNALS - VIDEO DETECTION CONVERSION
PROJECT NAME
6305
PROJECT NO.
PROJECT LOCATION MAP:
N/A
VIDEODET
PROJECT LOCATION:
Citywide.
PROJECT DESCRIPTION:
Convert existing traffic signal with video detection equipment along streets
included in the Pavement Management Program projects.
PROJECT NEED:
Traffic signals are being converted to Video Detection to minimize impacts
during future construction projects and to eliminate the cost associated with
future loop replacements.
FINANCING:
Purpose
Construction
Total Cost =
Estimated Cost
$1,850,000
$1,850,000
Funding Source
Gas Tax
Page 212
t i i i : ; { i t I II il t I
STREET PROJECTS
FUNDING MATRIX FOR STREET PROJECTS
PROJ
NO.
3922
3184
3814
3947
3854
6000
3919
3557
3636
3879
6006
3607
3643
3909
3920
3929
3957
3622
NEW
3811
FUND
NO.
39221
31842
38141
39471
38541
60001
39191
35571
36362
38791
60061
36071
36431
39091
39201
39291
39571
36222
38111
PROJECT TITLE
AVENIDA ENCINAS WIDENING - SOUTH OF PALOMAR AIRPORT ROAD
BTD#2/POINSETTIA LANE - REACH E (PARTIAL FUNDING)
BTD#2/POINSETTIA LANE - REACHES A,B,C,F,G & AVIARA PKWY REIMS
BTD#3 CANNON ROAD - FROST TO FARADAY (REIMS.)
CANNON ROAD REACH 48
CARLSBAD BLVD AT BREAKWATER ROAD - LEFT TURN LANE
CARLSBAD BLVD AT STATE ST - INTERSECTION ENHANCEMENT DESIGN
CARLSBAD BLVD AT STATE ST - INTERSECTION ENHANCEMENT DESIGN
CARLSBAD BLVD BRIDGE OVER POWER PLANT DISCHARGE CHANNEL
CARLSBAD BLVD BRIDGE OVER RAILROAD CONCRETE BARRIER
CARLSBAD BOULEVARD ENCINAS CREEK BRIDGE REPLACEMENT
CARLSBAD BOULEVARD ENCINAS CREEK BRIDGE REPLACEMENT
CARLSBAD BOULEVARD ENCINAS CREEK BRIDGE REPLACEMENT
CARLSBAD BOULEVARD MEDIAN-TAMARACK AVENUE TO PINE AVENUE
CARLSBAD BOULEVARD RETROFIT OVER SDNR
CARLSBAD BOULEVARD WIDENING - CANNON TO MANZANO
CARLSBAD VILLAGE DRIVE AND AVENIDA DE ANITA
CARLSBAD VILLAGE DRIVE WIDENING
COLLEGE BLVD REACH A AND CANNON REACH 4A
COLLEGE/CANNON ASSESSMENT DISTRICT
CONCRETE REPLACEMENT
EL CAMINO REAL AND CARLSBAD VILLAGE DRIVE
EL CAMINO REAL AND FARADAY AVENUE
EL CAMINO REAL AT AVIARA PARKWAY/ALGA ROAD
EL CAMINO REAL MEDIANS
EL CAMINO REAL MEDIANS - LA COSTA
EL CAMINO REAL WIDENING - LA COSTA AVENUE TO ARENAL ROAD
EL CAMINO REAL WIDENING - LISA STREET TO CRESTVIEW DR (LOAN)
EL CAMINO REAL WIDENING - NORTH OF COUGAR DRIVE (LOAN)
EL CAMINO REAL WIDENING - S CHESTNUT/S ALGA
EL CAMINO REAL WIDENING - TAMARACK AVENUE TO CHESTNUT AVE.
EL CAMINO REAL WIDENING - TAMARACK AVENUE TO CHESTNUT AVE.
FARADAY AVENUE AND MELROSE DRIVE EXTENSIONS
I-5 AND LA COSTA AVENUE AUXILLARY LANES
MELROSE DRIVE AND ALGA ROAD
PALOMAR AIRPORT ROAD AND COLLEGE BOULEVARD
PALOMAR AIRPORT ROAD AND MELROSE BOULEVARD RIGHT TURN
PALOMAR AIRPORT ROAD AND MELROSE BOULEVARD RIGHT-TURN LANE
PALOMAR AIRPORT ROAD WIDENING AT PASEO DEL NORTE
FUNDING
SOURCE
TIF
BTD*2
BTD*2
8TM3
TRANSNET-HWY
REDVLSCCRDA
GCC
REDVL VILLAGE
GCC
GCC
REDVLSCCRDA
FED GRNT
TRANSNET-LOC
PFF
TRANSNET-LOC
TIF
GCC
TIF
OTHER
OTHER
IRF
TIF
TIF
TIF
PFF
PFF
TIF
TRANSNET-LOC
TRANSNET-LOC
TIF
TIF
TRANSNET-LOC
OTHER
CFD#1
TIF
TIF
GAS TAX
OTHER
TOTAL
BUDGET
983,000
11,050,000
1,320,729
6,194,747
1 ,722,303
243,150
105,000
100,000
1,300,000
191,000
41,453
1,964,702
254,548
2,041,080
1,519,000
2,363,960
105,000
1,488,458
1,754,519
10,143,518
1,050,000
334,720
1,235,941
294,972
2,311,100
90,500
531,368
959,000
493,000
522,115
1,382,708
3,300,000
945,574
2,000,000
566,932
167,360
65,000
130,000
525,000
145,627
FUTURE YEAR BUDGET AMOUNTS
YEAR1
2006-07
280,000
297,682
38,568
3,300,000
65,000
130,000
YEAR 2
2007-2008
600,000
140,000
191,000
1,667,020
215,980
105,000
959,000
YEAR 3
2008-2009
1,600,000
880,000
145,627
YEAR 4
2009-2010
YEARS
2010-2011
YEAR 6-10
2011-2016
983,000
334,720
294,972
531,368
167,360
BUILDOUT
2016-2021
9,100,000
1,320,729
400,000
2,041 ,080
2,363,960
1,488,458
1,401,600
2,000,000
566,932
ii ii ti vi PI PI P i r i r i PI 11 •! 11 ii 11 ii • i 11
t 1 i i i i i i i i i i i i f i if
FUNDING MATRIX FOR STREET PROJECTS
PRO)
NO.
3667
3679
6001
3689
3860
3190
3907
3880
6000
3953
3928
3895
FUND
NO.
36671
36791
60011
36892
38601
31906
39071
38801
60005
39531
39281
38951
PROJECT TITLE
PAVEMENT MANAGEMENT PROGRAM
PAVEMENT MANAGEMENT PROGRAM
PAVEMENT MANAGEMENT CONCRETE REPAIR
PAVEMENT MANAGEMENT PROGRAM (NON-JURIS FEES)
POINSETTIA LANE EAST OF EL CAMINO REAL FINANCING PROGRAM
POINSETTIA LANE WIDENING (PASEO DEL NORTE TO BATIQUITOS LN)
RANCHO SANTA FE ROAD AND OLIVENHAIN IMPROVEMENTS
RANCHO SANTA FE ROAD NORTH - PHASE I
RANCHO SANTA FE ROAD NORTH - PHASE II (BRIDGE)
RANCHO SANTA FE ROAD SOUTH
SAN MARCOS BOULEVARD WIDENING PROJECT
SIDEWALK/STREET CONSTRUCTION PROGRAM
TAMARACK AND ADAMS
TRAFFIC MONITORING PROGRAM
UNDERGROUND DIST. 17 - HARDING, ROOSEVELT
VALLEY AND MAGNOLIA SIDEWALKS
VALLEY AND MAGNOLIA SIDEWALKS
FUNDING
SOURCE
TRANSNET-LOC
GAS TAX
GCC
TRANSNET4.OC
OTHER
TIP
RSF ROAD
RSF ROAD
RSF ROAD
RSF ROAD
GCC
TIF
GCC
TIF
GCC
TIF
TDA
TOTAL
BUDGET
58,710,348
4,701,088
3,750,000
12,609,000
28,931 ,541
2,210,198
3,800,000
26,406,243
18,641,000
1,350,000
2,424,189
3,270,672
48,500
1,280,611
509,800
315,000
315,000
FUTURE YEAR BUDGET AMOUNTS
YEAR1
2006-07
2,500,000
250,000
800,000
300,000
70,000
YEAR 2
2007-2008
2,500,000
250,000
800,000
210,000
48,500
70,000
90,000
YEAR 3
2008-2009
2,600,000
250,000
800,000
75,000
70,000
225,000
315,000
YEAR 4
2009-2010
2,648,000
250,000
952,000
300,000
70,000
YEARS
2010-2011
2,813,000
250,000
787,000
300,000
70,000
YEAR 6-10
2011-2016
14,065,000
1,250,000
3,935,000
1,200,000
350,000
BUILDOUT
2016-2021
14,065,000
1,250,000
3,935,000
2,210,198
350,000
CAPITAL PROJECT DESCRIPTION
CIRCULATION SYSTEM STREET PROJECTS - AVENIDA ENCINAS WIDENING
SOUTH OF PALOMAR AIRPORT ROAD
PROJECT NAME
NONE
PROJECT NO.
PROJECT LOCATION MAP:
AVENIDA
I I I 1
PROJECT LOCATION:
Along the west side of Avenida Encinas south of Palomar Airport Road
adjacent to the San Diego Northern Railway property.
PROJECT DESCRIPTION:
Widen the west side of Avenida Encinas to full secondary arterial standards
from Palomar Airport Road to approximately 800 feet south. The work includes
placement of fill material and construction of new curbs, gutters, aggregate
base, asphalt paving and striping.
PROJECT NEED:
Required to comply with Growth Management Standards.
FINANCING:
Purpose Estimated Cost Funding Source
Design/Construction $983,000 TIP
Total Cost = $983,000
II II 11 II II II II II II f I II
Page 215
II II II II II II
i i i ! i i t i i § i i i i i t i t i II ii
CAPITAL PROJECT DESCRIPTION
CIRCULATION SYSTEM STREET PROJECTS - B&TD #2 POINSETTIA LANE REACH "E"
(CASSIA ROAD TO SKIMMER COURT)
PROJECT NAME
3922
PROJECT NO.
PROJECT LOCATION MAP:PROJECT LOCATION:
Along the future extension of Poinsettia Lane from its existing terminus at
Cassia Road east to Skimmer Court.
PROJECT DESCRIPTION:
Partial funding for construction of Reach "E" of Poinsettia Lane including full
width grading to major arterial standards, adequate drainage improvements
necessary to protect the roadbed, and two 18-foot paved traffic lanes
separated by a raised unimproved median. Also included within the project are
all land acquisition and environmental mitigation costs. The project is part of
the improvements funded by Bridge and Thoroughfare District No. 2 (B&TD#2).
PROJECT NEED:
Required pursuant to the City's Circulation Elements and Growth Management
Program.
FINANCING:
Purpose
Design/Construction
Land Acquisition
Total Cost =
Estimated Cost
$11,050,000
$11,050,000
Funding Source
B&TD#2
B&TD#2E
Page 216
CAPITAL PROJECT DESCRIPTION
NONE
CIRCULATION SYSTEM STREET PROJECTS - BRIDGE AND THOROUGHFARE DISTRICT NO. 2
POINSETTIA LANE REACHES A. B. C. F. G & AV1ARA PARKWAY REIMBURSEMENT
PROJECT NAME
PROJECT NO.
PROJECT LOCATION MAP:
AVIA_ECR
ii • • r i • i
PROJECT LOCATION:
Along Poinsettia Lane from the eastern Zone 19 boundary to El Camino Real.
PROJECT DESCRIPTION;
Reimbursement for construction of Reach A, B, C, F, & G of Poinsettia Lane
and a portion of Aviara Parkway including full-width grading to major arterial
standards, adequate drainage improvements necessary to protect the roadbed,
and two 18-foot paved traffic lanes separated by a raised unimproved median.
The project is part of the improvements funded by Bridge and Thoroughfare
District No. 2 (B&TD#2).
PROJECT NEED:
Required to meet Growth Management Standards for future development
within Local Facility Management Zone.
FINANCING:
Purpose
Construction
Total Cost =
Estimated Cost Funding Source
$1,320,729 B&TD #2
$1,320,729
Page 217
11 II II II II t I • 1
ililililtiiiiiifiiii t i i i i I t i i i
CAPITAL PROJECT DESCRIPTION
CIRCULATION SYSTEM STREET PROJECTS - B&TD #3 - CANNON ROAD WEST
FROST AVENUE TO FARADAY AVENUE (REIMBURSEMENT)
PROJECT NAME
3184
PROJECT NO.
PROJECT LOCATION MAP:PROJECT LOCATION:
Cannon Road from Frost Avenue to Faraday Avenue.
PROJECT DESCRIPTION:
Reimbursement for the construction of a 4-lane major arterial road from
Frost Avenue to Faraday Avenue. Work includes full width grading, curb and
gutter, base and paving, raised landscaped median, sidewalks and streetlights.
NOTE: Cannon Road West was constructed entirely by the adjacent land
developer. The City may reimburse the developer for eligible work in
accordance with a Council approved reimbursement agreement.
PROJECT NEED:
Required to comply with Growth Management Standards and to complete a
vital arterial roadway identified in the Circulation Element of the General Plan.
FINANCING:
Purpose
Construction
Total Cost =
Estimated Cost
$6,194,747
$6,194,747
Funding Source
B&TD #3
CANNWEST Page 218
CAPITAL PROJECT DESCRIPTION
CIRCULATION SYSTEM STREET PROJECTS - CANNON ROAD REACH 4B
COLLEGE BOULEVARD TO OCEANSIDE
PROJECT NAME
3814
PROJECT NO.
PROJECT LOCATION MAP:PROJECT LOCATION:
Along Cannon Road from future College Boulevard to the Carlsbad/Oceanside
city limits.
PROJECT DESCRIPTION:
Preliminary design of Reach 4 of Cannon Road to full major arterial standards,
including all required environmental mitigation costs.
PROJECT NEED:
Required pursuant to the City Circulation Element and to comply with the
Growth Management Circulation Standards. Since the project passes through
the existing coastal sage habitat preserve area, it is not included as a financing
requirement of any of the local facilities management plans.
FINANCING:
Purpose
Preliminary Design
Total Cost =
Estimated Cost
$1,722,303
$1,722,303
Funding Source
TransNet Hwy
Cannon34 219
I 1 I I I I I I I I I I I 1 I I I 1 ft I if § I • I 11 II II II • I il
i i i i i i i i i i i i t i i t 1 i t i
CAPITAL PROJECT DESCRIPTION
CIRCULATION SYSTEM STREET PROJECTS - CARLSBAD BOULEVARD AT
BREAKWATER ROAD - LEFT TURN LANE
PROJECT NAME
3947
PROJECT NO.
PROJECT LOCATION MAP:
PROJECT
SITE
PROJECT LOCATION:
Northbound Carlsbad Boulevard at Breakwater Road
PROJECT DESCRIPTION:
Installation of left turn lane on northbound Carlsbad Boulevard including the
required roadway widening, median removal, drainage structures, traffic signal
modifications, and signing and striping.
PROJECT NEED:
Access to the South Carlsbad State Beach campground facility is restricted to
southbound traffic only. Vehicles approaching on westbound Poinsettia Lane
and northbound Carlsbad Boulevard must divert north on Carlsbad Boulevard.
The proposed left turn lane will allow these northbound vehicles to u-turn at
Breakwater Road and enter the campground from southbound Carlsbad
Boulevard.
FINANCING:
Purpose
Total Cost :
Estimated Cost Funding Source
$243,150 SCCRDA
Uturncbad Page 220
CAPITAL PROJECT DESCRIPTION
CIRCULATION SYSTEM STREET PROJECTS - CARLSBAD BOULEVARD AND
STATE STREET PEDESTRIAN AND INTERSECTION ENHANCEMENT DESIGN
PROJECT NAME
6000
PROJECT NO.
PROJECT LOCATION MAP:
BUENA
VISTA
LAGOON >
PROJECT
SITE
PROJECT LOCATION:
Carlsbad Boulevard from north city limits to State Street.
PROJECT DESCRIPTION:
The project involves the study and design of a pedestrian walkway on the
eastern side of Carlsbad Boulevard from State Street to the northern City limits.
The feasibility study will review pedestrian/bicycle/vehicle access and safety
issues along Carlsbad Boulevard, identify potential safety improvements,
determine the scope of the environmental and operational impacts, and
develop planning level cost estimates for the various options identified in the
study. The project may also include intersection modifications at Carlsbad Blvd
and State Street to incorporate a traffic signal or stop control to assign right-of-
way. The project will then complete design plans for the appropriate
enhancements/improvements.
PROJECT NEED:
A pedestrian walkway is needed to provide separation between pedestrians
and vehicles/bicycles traveling between Carlsbad and Oceanside along
Carlsbad Boulevard. Modification of the Carlsbad Blvd/State Street intersection
and installation of traffic control devices will facilitate right-of-way assignment.
FINANCING:
Purpose
Study/Report
Design
Total Cost =
Estimated Cost Funding Source
$105,000
$100,000
$205,000
GCC
Redvl Village
Cbad_State
ii ii ii ii ii ii t i ii ii ii mm mm
Page 221
• 1
i 1 i i i t i
CAPITAL PROJECT DESCRIPTION
CIRCULATION SYSTEM STREET PROJECTS - CARLSBAD BOULEVARD BRIDGE OVER
POWER PLANT DISCHARGE CHANNEL
PROJECT NAME
NONE
PROJECT NO.
PROJECT LOCATION MAP:
AGUA
HEDIONDA
LAGOON
PROJECT
SITE
PROJECT LOCATION:
Carlsbad Boulevard north of Cannon Road over the power plant outlet channel.
PROJECT DESCRIPTION:
Installation of a concrete barrier on the existing bridge, provide a decorative
fence to screen the existing power plant, and provide any needed repair of the
bridge deck. Project may require relocation of a 12-inch water line, 4-inch
HP gas line, and telephone conduit.
PROJECT NEED:
The existing bridge does not have a protective barrier protecting motorists in
accordance with Caltrans standards. The edges of the existing bridge have
extensive concrete flaking with exposed rebar.
FINANCING:
Purpose
Design
Environmental
Property Acquisition
Construction
Admin/Inspection
Total Cost =
Estimated Cost
$220,000
$15,000
$100,000
$800,000
$165,000
$1,300,000
Funding Source
GCC
GCC
GCC
GCC
GCC
CBPWRPLNT Page 222
CAPITAL PROJECT DESCRIPTION
CIRCULATION SYSTEM STREET PROJECTS - CARLSBAD BOULEVARD BRIDGE OVER
RAILROAD CONCRETE BARRIER
PROJECT NAME
NONE
PROJECT NO.
PROJECT LOCATION MAP:
S|^ BUENA
^im VISTA
CSBADBLVD
ii it ii *i ri n
PROJECT LOCATION:
Carlsbad Boulevard over the railroad tracks at State Street.
PROJECT DESCRIPTION:
Replace the existing decorative concrete barrier in accordance with Caltrans
requirements.
PROJECT NEED:
The existing concrete barrier is in poor condition with concrete flaking, cracking
and exposed rebar.
FINANCING:
Purpose
Design
Construction
Admin/Inspection
Total Cost =
Estimated Cost
$37,000
$134,000
$20,000
$191,000
Funding Source
GCC
GCC
GCC
• ii ft r i * i *ni
Page 223
ff I ft • I
if 1 I I 1 i I
CAPITAL PROJECT DESCRIPTION
CIRCULATION SYSTEM STREET PROJECTS - CARLSBAD BOULEVARD
ENCINAS CREEK BRIDGE REPLACEMENT
PROJECT NAME
3919
PROJECT NO.
PROJECT LOCATION MAP:
PROJECT
PROJECT LOCATION:
Southbound lanes of Carlsbad Boulevard south of Palomar Airport Road and
north of the South Carlsbad State Beach campgrounds.
PROJECT DESCRIPTION:
Complete replacement of the existing bridge structure for southbound lanes of
Carlsbad Boulevard originally constructed in 1913. The budget for this project
includes staff time to pursue federal grants for funding of the project.
PROJECT NEED:
Carlsbad Boulevard is a major north/south transportation roadway in north
county. The bridge structure does not meet seismic standards and is close to
exceeding its expected service life. Reinforcing steel is exposed and corroding
and Caltrans has recommended that the bridge be replaced.
FINANCING:
Purpose
Studies & Reports
Construction
Construction
Total Cost =
Estimated Cost Funding Source
$41,453
$1,964,702
$254,542
$2,260,703
SCCRDA
Federal Grant
TransNet Local
ECbridge Page 224
CAPITAL PROJECT DESCRIPTION
CIRCULATION SYSTEM STREET PROJECTS - CARLSBAD BOULEVARD MEDIAN
TAMARACK AVENUE TO PINE AVENUE
PROJECT NAME
3444
PROJECT NO.
PROJECT LOCATION MAP:PROJECT LOCATION:
Carlsbad Boulevard from Tamarack Avenue to Pine Avenue.
PROJECT DESCRIPTION:
Construct raised, landscaped median. Work includes concrete curb,
landscaping, irrigation and colored, stamped concrete.
PROJECT NEED:
The median is needed to bring this section of Carlsbad Boulevard up to City
Standards for a major arterial.
FINANCING:
Purpose Estimated Cost Funding Source
Design/Construction $2,041,080 PFF
Total Cost = $2,041,080
CBMEDIAN Page 225
§• mm
i i t i i t i
CAPITAL PROJECT DESCRIPTION
3557
CIRCULATION SYSTEM STREET PROJECTS - CARLSBAD BOULEVARD BRIDGE RETROFIT OVER
SAN DIEGO NORTHERN RAILROAD
PROJECT NAME
PROJECT NO.
PROJECT LOCATION MAP:PROJECT LOCATION:
On Carlsbad Boulevard 500' southerly of its intersection with State Street.
PROJECT DESCRIPTION:
The project consists of removing the existing 72 year old two-lane bridge and
constructing a new four-lane bridge with bicycle lanes and sidewalks over the
San Diego Northern Railroad.
PROJECT NEED:
Caltrans has determined that the bridge over the railroad is vulnerable to
severe damage during the design earthquake. Caltrans and the Federal
Highways Administration will fund a seismic retrofit of the bridge. Given the
age and conditions of the bridge, Caltrans has agreed to apply the retrofit funds
towards the construction of a replacement bridge. Widening of the bridge is
necessary to bring this section of Carlsbad Boulevard into conformance with
City Standards and to assure compliance with Growth Management Standards
at buildout.
FINANCING;
Purpose
Design
Construction
Total Cost =
Estimated Cost Funding Source
$500,000
$1,019,000
$1,519,000
TransNet/Local*
TransNet/Local*
* Funds totaling approximately $1,054,000 to be reimbursed from Federal and
State Grants.
RRbridge Page 226
CAPITAL PROJECT DESCRIPTION
CIRCULATION SYSTEM STREET PROJECTS - CARLSBAD BOULEVARD WIDENING
CANNON ROAD TO MANZANO DRIVE
PROJECT NAME
NONE
PROJECT NO.
PROJECT LOCATION MAP;
CBADWIDE
i i i i PI
PROJECT LOCATION:
Carlsbad Boulevard from Manzano Drive to Cannon Road.
PROJECT DESCRIPTION:
Widen Carlsbad Boulevard from two lanes to four lanes with a center raised
median (major arterial). Construct pavement, curb and gutter, stamped
concrete and landscaping.
A planning study was initiated in 1992 to determine alignment alternatives and
investigate property access problems.
PROJECT NEED:
Required to meet Growth Management Standards and the Circulation Element
of the General Plan.
FINANCING:
Purpose Estimated Cost Funding Source
Design/Construction $2,363,960 TIP
Total Cost = $2,363,960
ft fi • i if BTI *i § i ft ri
Page 227
ri * i § • • i
i l I 1 i l i i t i i I 1 i I i I i i i i i
CAPITAL PROJECT DESCRIPTION
NONE
CIRCULATION SYSTEM STREET PROJECTS - CARLSBAD VILLAGE DRIVE AND AVENIDA DE ANITA
PROJECT NAME
PROJECT NO.
PROJECT LOCATION MAP:PROJECT LOCATION:
Northwest corner of Carlsbad Village Drive and Avenida de Anita.
PROJECT DESCRIPTION:
Reconstruct Avenida de Anita as it approaches Carlsbad Village Drive to
reduce the grade break at the intersection.
PROJECT NEED:
The project will reduce the grade break at the intersection and eliminate the
damage to the roadway and large vehicles. NCTD experiences problems with
their buses due to the grade break and may consider eliminating bus services
to the general area.
FINANCING:
Purpose
Design
Construction
Admin/Inspection
Total Cost =
Estimated Cost
$22,000
$65,000
$15,000
$105,000
Funding Source
GCC
GCC
GCC
CVD ADA Page 228
CAPITAL PROJECT DESCRIPTION
CIRCULATION SYSTEM STREET PROJECTS - CARLSBAD VILLAGE DRIVE WIDENING
PROJECT NAME
NONE
PROJECT NO.
PROJECT LOCATION MAP:
CVDWIDEN
11 II II
PROJECT LOCATION:
On Carlsbad Village Drive from 200 feet east of Pontiac Drive to 200 feet east
of Victoria Street.
PROJECT DESCRIPTION:
Widen Carlsbad Village Drive to secondary arterial standards; street is
currently only half-width. Construct curb & gutter, sidewalk, streetlights,
median curb, base and asphalt pavement. The project design may include
standard modifications consistent with local environmental and topographical
constraints of the project site.
PROJECT NEED:
Required to meet Growth Management Standards and the Circulation Element
of the General Plan.
FINANCING:
Purpose Estimated Cost Funding Source
Design/Construction $1,488,458 TIP
Total Cost = $1,488,458
it an
Page 229
r i * i » i
» t i i a i i
CAPITAL PROJECT DESCRIPTION
CIRCULATION SYSTEM STREET PROJECTS - COLLEGE BOULEVARD REACH A
AND CANNON ROAD REACH 4A
PROJECT NAME
3636
PROJECT NO.
PROJECT LOCATION MAP:
'PROJECT
PROJECT LOCATION:
College Boulevard east of ECR from the existing College Boulevard terminus
at Badger Lane to Cannon Road and Cannon Road from College Boulevard to
approximately 1,200 foot east.
PROJECT DESCRIPTION:
Construction of the core improvements to College Boulevard from Badger Lane
to Cannon Road and Cannon Road from College Boulevard to approximately
1,200 feet east of the College/Cannon intersection. The core improvements
include full-width grading, two 18-foot paved travel lanes (one on each side of a
raised unimproved median), median curbs, transition to full improvements at
the intersection of College Boulevard and Cannon Road, drainage
improvements to protect the road fill, a bridge structure across Sunny Creek,
erosion control, environmental mitigation and Master Drainage Plan flood
retention Basin BJ. The Basin BJ improvements include relocation of the
existing private RV storage, maintenance facilities and community garden
owned by the Rancho Carlsbad Mobile Home Park residents which currently
occupy the proposed basin site.
PROJECT NEED:
The project is needed to comply with the City's Growth Management Plan and
to complete the Circulation Element.
FINANCING:
Purpose
Environmental
Construction
Total Cost =
Estimated Cost
$220,000
$1,534,519
$1,754,519
Funding Source
Other (Developer)
Other (Developer)
CollegeA Page 230
CAPITAL PROJECT DESCRIPTION
3879
CIRCULATION SYSTEM STREET PROJECTS - COLLEGE BOULEVARD/CANNON ROAD REACH 3
ASSESSMENT DISTRICT
PROJECT NAME
PROJECT NO.
PROJECT LOCATION MAP:
LAKE
CALAVERA
PROJECT LOCATION:
Along the extension of College Boulevard from Cannon Road to Carlsbad
Village Drive and along the extension of Cannon Road from El Camino Real to
College Boulevard.
PROJECT DESCRIPTION:
Formation of a financing district for the purpose of financing the construction of
the above described sections of College Boulevard and Cannon Road.
The improvements within the project include full width grading of the College
and Cannon roadways to major arterial standards, construction of the center
two lanes separated by a raised unimproved median, installation of needed
drainage improvements to protect the roadbed, and full width improvements of
the arterial intersections with El Camino Real. The outside traffic lanes, fronting
improvements and median landscaping/hardscaping will be the obligation of
adjacent developing property owners.
PROJECT NEED:
The project is required to complete the Circulation Element of the General Plan
and to comply with the Growth Management Standard for circulation facilities.
Financing for the project is required prior to any further development within
Zones 7 and 14. Construction of the project may occur in phases consistent
with the requirements of the various individual zone plans.
FINANCING:
Purpose
Construction
Total Cost =
Estimated Cost
$10,143,518
$10,143,518
Funding Source
Assessment District
B&TD_4 231
ii ii i i ii ii ii ii ii ii ii t i ii 11 r i vi ii ii fi
ii t i t i i i ! i I t i i i i i i i i i
CAPITAL PROJECT DESCRIPTION
CIRCULATION SYSTEM STREET PROJECTS - CONCRETE REPLACEMENT
PROJECT NAME
6006
PROJECT NO.
PROJECT LOCATION MAP:
HIGHWAY.??
PROJECT
AREA
PROJECT LOCATION:
Various locations in the northwest quadrant of the City.
PROJECT DESCRIPTION:
The project is designed to replace curb, gutter, sidewalk, and driveway
approaches on those streets which will receive pavement overlay in Fiscal Year
06-07. There are over 700 locations which will be reconstructed as part of the
project.
PROJECT NEED:
The concrete work occurs at locations where there is deterioration, cracking,
and uplifting of existing concrete improvements.
FINANCING:
Purpose
Construction
Admin/Inspection
Total Cost =
Estimated Cost Funding Source
$1,193,350
$50,000
$1,243,350
IRF
IRF
CONCRETE
Page 232
CAPITAL PROJECT DESCRIPTION
NONE
CIRCULATION SYSTEM STREET PROJECTS - EL CAMINO REAL AND CARLSBAD VILLAGE DRIVE
PROJECT NAME
PROJECT NO.
PROJECT LOCATION MAP:
^\
ECRCVDR
I 1 |
CARLSBAD VILLAGE DR.
PROJECT LOCATION;
At the intersection of El Camino Real and Carlsbad Village Drive.
PROJECT DESCRIPTION:
Construct northbound and southbound dual left-turn lanes on El Camino Real.
PROJECT NEED:
Required to meet Growth Management Standards.
FINANCING:
Purpose Estimated Cost Funding Source
Construction $334,720 TIP
Total Cost = $334,720
Page 233
• i • i
i i i i i i 1 I i i l t i i i i § i i i i i i i
CAPITAL PROJECT DESCRIPTION
3607
CIRCULATION SYSTEM STREET PROJECTS - EL CAMINO REAL AND FARADAY AVENUE
PROJECT NAME
PROJECT NO.
PROJECT LOCATION MAP:
I I
FARADAY AVE.
g
ECRFARAD
PROJECT LOCATION:
The intersection of El Camino Real and Faraday Avenue.
PROJECT DESCRIPTION:
Intersection improvements which include adding three exclusive right turns
(southbound, eastbound and westbound). Construct curb and gutter, asphalt
pavement and sidewalk. Additional right-of-way will be required.
PROJECT NEED:
Required to meet Growth Management Standards.
FINANCING:
Purpose
Admin/Inspection
Design
Construction
Total Cost =
Estimated Cost Funding Source
$67,000
$33,000
$1,135,941
$1,235,941
TIP
TIP
TIP
Page 234
CAPITAL PROJECT DESCRIPTION
NONE
CIRCULATION SYSTEM STREET PROJECTS - EL CAM1NO REAL AT AVIARA PARKWAY/ALGA ROAD
PROJECT NAME
PROJECT NO.
PROJECT LOCATION MAP:PROJECT LOCATION:
On El Camino Real at Aviara Parkway/Alga Road.
PROJECT DESCRIPTION:
Construction of median improvements and lane striping immediately south of
Aviara Parkway/Alga Road to accommodate dual northbound to westbound
turn lanes. May include modification to the existing traffic signal standards.
PROJECT NEED:
Required to comply with Growth Management Standards.
FINANCING:
Purpose Estimated Cost Funding Source
Design/Construction $294,972 TIP
Total Cost = $294,972
ECRAVIAR
II II II II II II II II II II II
Page 235
11 ii vi f i * i
i i i i i 1 i i i i i i i f i I t i i i i i ! ' . ;
CAPITAL PROJECT DESCRIPTION
i t i I i i I i i i
3643 & 3909
CIRCULATION SYSTEM STREET PROJECTS - EL CAMINO REAL MEDIANS
PROJECT NAME
PROJECT NO.
PROJECT LOCATION MAP:PROJECT LOCATION:
At various locations along El Camino Real between the north and south City
boundaries.
PROJECT DESCRIPTION:
Construct raised, landscaped medians at various places where no developer
will be obligated to do so as a condition of a private development.
Work includes median curb, stamped concrete paving, irrigation and
landscaping.
NOTE: Project funds may be used to reimburse developer for construction of
median improvements in excess of those improvements required of
the development. Currently, $100,000 is budgeted to reimburse the
Evans Point developer for median improvements constructed adjacent
to the Rancho Carlsbad Mobile Home Park.
PROJECT NEED:
Raised landscaped medians are required on prime arterials for vehicular safety
and to meet City standards.
FINANCING:
Purpose
Construction
Total Cost =
Estimated Cost Funding Source
$2,401,600 PFF
$2,401,600
ECRMDIAN Page 236
CAPITAL PROJECT DESCRIPTION
CIRCULATION SYSTEM STREET PROJECTS - EL CAMINO REAL WIDENING
LA COSTA AVENUE TO ARENAL ROAD
PROJECT NAME
NONE
PROJECT NO.
PROJECT LOCATION MAP:
UGOCN
ECRLACOS
1 11 II
PROJECT LOCATION:
On the west side of El Camino Real from La Costa Avenue to Arenal Road.
PROJECT DESCRIPTION:
Add the southbound lane for a length of approximately 3,400 feet to widen the
street to full prime arterial standards. Construct curb & gutter, sidewalk, base,
and asphalt pavement and streetlights.
PROJECT NEED:
Required to comply with Growth Management Standards.
FINANCING:
Purpose Estimated Cost Funding Source
Design/Construction $531,368 TIP
Total Cost = $531,368
Page 237
ii ii ii ii ii PI ii r i PI • i 11 ii t • i
! : i t I I I ; ! • -. It
CAPITAL PROJECT DESCRIPTION
CIRCULATION SYSTEM STREET PROJECTS - EL CAMINO REAL WIDENING -
LISA STREET TO CRESTVIEW DRIVE
PROJECT NAME
i l I i i i j
NONE
PROJECT NO.
PROJECT LOCATION MAP:
'PROJECT
SITE
PAM
PROJECT LOCATION:
West side of El Camino Real from south of Lisa Street to Crestview Drive.
PROJECT DESCRIPTION:
Widening approximately 1,200 linear feet of roadway including construction of
curb, gutter, sidewalks, pavement, median, and roadway rehabilitation on
El Camino Real.
PROJECT NEED:
El Camino Real is identified in the SANDAG Congestion Management Plan
(CMP) as a failing road. Adjacent property is fully developed. Widening this
section of roadway will contribute to the City's CMP deficiency plan as
mandated by the State.
FINANCING:
Purpose
Design & Environmental
Right-of-Way
Construction
Total Cost =
Estimated Cost
$82,000
$250,000
$627,000
$959,000
Funding Source
*TransNet Local
*TransNet Local
*TransNet Local
•Funding source may change if adjacent property develops or
assessment districts are formed.
ECR Lisa Page 238
CAPITAL PROJECT DESCRIPTION
CIRCULATION SYSTEM STREET PROJECTS - EL CAMINO REAL WIDENING
NORTH OF COUGAR DRIVE
PROJECT NAME
3920
PROJECT NO.
PROJECT LOCATION MAP:
10JECT
SITE
Elcamino
i fi f i
PROJECT LOCATION:
East side of El Camino Real north of Cougar Drive.
PROJECT DESCRIPTION:
Widening approximately 250 linear feet of roadway including construction of
curb, gutter, sidewalks, pavement, median, and roadway rehabilitation on
El Camino Real.
PROJECT NEED:
El Camino Real is identified in the SANDAG Congestion Management Plan
(CMP) as a failing road. Adjacent property is fully developed. Widening this
section of roadway will contribute to the City's CMP deficiency plan as
mandated by the State.
FINANCING:
Purpose
Design & Environmental
Right-of-Way
Construction
Total Cost =
Estimated Cost
$30,000
$60,000
$403,000
$493,000
Funding Source
*TransNet Local
*TransNet Local
*TransNet Local
•Funding source may change If adjacent property develops or
assessment districts are formed.
239
i ri i vi ii ii §i * i f vi ii 11 11
till i i I I I ) f I a I i i i i i
CAPITAL PROJECT DESCRIPTION
CIRCULATION SYSTEM STREET PROJECTS - EL CAMINO REAL WIDENING
TAMARACK AVENUE TO CHESTNUT AVENUE
PROJECT NAME
3957 & 3929
PROJECT NO.
PROJECT LOCATION MAP:
PROJECT
PROJECT LOCATION:
Along El Camino Real from Tamarack Avenue to Chestnut Avenue.
PROJECT DESCRIPTION:
Add the outside lane to widen street to full prime arterial standards. Widen west
side approximately 1,200 feet in length and east side approximately 600 feet in
length. Construct curb & gutter, sidewalk, base, and asphalt pavement and
streetlights.
PROJECT NEED:
To complete widening to prime arterial standards where no developers are
likely to develop and to improve the road capacity.
FINANCING:
Purpose
Design/Construction
Construction
Total Cost =
Estimated Cost
$1,904,823
$3,300,000
$5,204,823
Funding Source
TIF
TransNet Local
ECRWIDE2 Page 240
CAPITAL PROJECT DESCRIPTION
CIRCULATION SYSTEM STREET PROJECTS - FARADAY AVENUE/MELROSE DRIVE EXTENSIONS
PROJECT NAME
36222
PROJECT NO.
PROJECT LOCATION MAP:
OCEANSIDE
PROJECT LOCATION:
Along the extension of Melrose Drive from Palomar Airport Road to the Carlsbad/Vista
city limit and along the extension of Faraday Avenue from Orion Way to Melrose Drive
in Vista.
PROJECT DESCRIPTION:
Construction of two lanes of Faraday Avenue approximately 1.3 miles from its current
terminus at Orion Way easterly to Melrose Drive in the City of Vista and the
construction of four lanes of Melrose Drive approximately 0.3 miles from Palomar
Airport Road to its current terminus at the Carlsbad/Vista city boundary. The project
would include the reconstruction of a portion of existing Melrose Drive in the City of
Vista and the construction of a bridge over the Agua Hedionda Creek along Faraday
Avenue.
PROJECT NEED:
The project is required to complete the Circulation Element of the General Plan and to
comply with the Growth Management Standard. The project will divert significant
amounts of traffic from existing Palomar Airport Road by providing a second east/west
arterial linkage from Melrose Drive to Interstate 5 through the core of the Carlsbad and
Vista industrial centers.
FINANCING:
Purpose Estimated Cost Funding Source
Preliminary Design
Design/Construction
Design
Design
Total
$1,021,826
$3,000,000
$97,210 ++
$110,200 ++
$3,207,410
Other (Developer)
Other
Water Connection
Sewer Replacement
++ Project Nos. 36224, 36225
+++Excludes construction costs by developer
FAR MELR
Page 241
II f 1 II II II II II II II VI f 1 t i * 1 * 1 11 II II IF • • •
k I I i t i
CAPITAL PROJECT DESCRIPTION
CIRCULATION SYSTEM FREEWAY INTERCHANGE PROJECTS - INTERSTATE 5 AND
LA COSTA AVENUE AUXILIARY LANES
PROJECT NAME
PROJECT NO.
PROJECT LOCATION MAP:PROJECT LOCATION;
At the intersection of Interstate 5 and La Costa Avenue.
PROJECT DESCRIPTION:
The addition of auxiliary traffic lanes on Interstate 5 to be installed at the future
direction of Caltrans.
PROJECT NEED:
Required to meet Growth Management Standards.
FINANCING:
Purpose Estimated Cost Funding Source
Design/Construction $2,000,000 CFD #1
Total Cost = $2,000,000
I-5LACOS Page 242
CAPITAL PROJECT DESCRIPTION
CIRCULATION SYSTEM STREET PROJECTS - MELROSE DRIVE AND ALGA ROAD
PROJECT NAME
NONE
PROJECT NO.
PROJECT LOCATION MAP:
MELROALG
i i ii mm
I\
ALGA ROAD
PROJECT LOCATION:
At the intersection of Melrose Drive and Alga Road.
PROJECT DESCRIPTION:
Construct dual left-turn lanes on all approaches to the intersections—
northbound, southbound, eastbound and westbound.
PROJECT NEED:
Required to meet Growth Management Standards.
FINANCING:
Purpose Estimated Cost Funding Source
Design/Construction $566,932 TIP
Total Cost = $566,932
Page 243
mm PI mm t i *i * « * i mm 11 •• m* vi
t I t I I I I I I i I I 'I I
CAPITAL PROJECT DESCRIPTION
NONE
CIRCULATION SYSTEM STREET PROJECTS - PALOMAR AIRPORT ROAD AND COLLEGE BOULEVARD PROJECT NO.
PROJECT NAME
PROJECT LOCATION MAP:
PARCOLLE
PALOMAR AIRPORT ROAD
PROJECT LOCATION:
At the intersection of the Palomar Airport Road and College Boulevard.
PROJECT DESCRIPTION:
Construct dual left-turn lane on College Boulevard southbound to eastbound.
Project work includes reconstruction of median improvements, striping and
signal modifications. Additional right-of-way will be required.
PROJECT NEED:
Required to meet Growth Management Standards.
FINANCING:
Purpose Estimated Cost Funding Source
Design/Construction $167,360 TIP
Total Cost = $167,360
Page 244
CAPITAL PROJECT DESCRIPTION
CIRCULATION SYSTEM STREET PROJECTS - PALOMAR AIRPORT ROAD AND
MELROSE AVENUE RIGHT-TURN LANE
PROJECT NAME
NONE
PROJECT NO.
PROJECT LOCATION MAP;
PAR_MEL
I I f 1
PROJECT LOCATION:
Southwest corner of Palomar Airport Road and Melrose Avenue.
PROJECT DESCRIPTION:
Widening Palomar Airport Road to provide a right-turn lane to southbound
Melrose Avenue.
PROJECT NEED:
The widening will accommodate a dedicated right-turn lane which will enable
this leg of the intersection to operate at an acceptable level of service in the
buildout condition. The construction will be performed by the developer and
the city will reimburse 25% of the cost ($65,000) upon Council approval of an
appropriate reimbursement agreement.
FINANCING:
Purpose
Design/Construction
Design/Construction*
Design/Construction
Estimated Cost
$130,000
$65,000
$65,000
Funding Source
CFD#2
Gas Tax
Developer
Total Cost = $260,000
*City responsible for 25% of construction costs.
Page 245
mm mm vi PI mm 9 i * i mm
t i i . , ; i •• j i I : \ ; i I ;
CAPITAL PROJECT DESCRIPTION
i i i i i i i
3811
CIRCULATION SYSTEM STREET PROJECTS - PALOMAR AIRPORT ROAD WIDENING AT PROJECT NO
PASEO DEL NORTE
PROJECT NAME
PROJECT LOCATION MAP:
PROJECT
SITE
PROJECT LOCATION:
On the north side of Palomar Airport Road at the intersection with Paseo Del
Norte.
PROJECT DESCRIPTION:
Widen the easterly approach of Palomar Airport Road (PAR) at the intersection
of Paseo Del Norte (PDN) to accommodate an additional through lane. The
added lane would be designed to align with the existing "right-turn only" lane
onto northbound Interstate 5. The existing westbound to northbound right-turn
lane from PAR to PDN would be relocated slightly north of its current location to
eliminate the partial offset with the existing "right-turn only1 lane on the west
side of the intersection.
PROJECT NEED:
Required to meet the Growth Management Circulation Standard. The current
intersection is operating at an unacceptable level of service due to a backup of
traffic attempting to go northbound along Interstate 5. This project will allow for
smoother transition of the westbound to northbound traffic into the two
right-turn lanes to northbound 1-5 from traffic proceeding westbound along
PAR through the PDN intersection.
FINANCING:
Purpose
Admin/Inspection
Construction
Total Cost =
Estimated Cost
$55,000
$480,000
$525,000
Funding Source
TIP
TIP
Par_pdn
Page 246
CAPITAL PROJECT DESCRIPTION
CIRCULATION SYSTEM STREET PROJECTS - PARK DRIVE. MARINA DRIVE TO COVE DRIVE
PROJECT NAME
NONE
PROJECT NO.
PROJECT LOCATION MAP:
SITE
AGUA
HEDKHM
LAGOOi
Park_dr
m-m r i r i mm mm
PROJECT LOCATION:
Westerly side of Park Drive between Marina Drive and Cove Drive.
PROJECT DESCRIPTION:
Reconstruct the westerly curb, gutter, and sidewalk along Park Drive between
marina Drive and Cove Drive.
PROJECT NEED:
The project will improve the condition of this segment of roadway so it is
consistent with the goal of providing a safe and efficient transportation system.
FINANCING:
Purpose
Design
Construction
Admin/Inspection
Total Cost =
Estimated Cost Funding Source
$25,000
$110,627
$10,000
$145,627
GCC
GCC
GCC
m * • i m i i i i
Page 247
• i mm
i t !§ i i i 1 I i
CAPITAL PROJECT DESCRIPTION
CIRCULATION SYSTEM STREET PROJECTS - PAVEMENT MANAGEMENT PROGRAM
PROJECT NAME
3667, 3679 &
3868
PROJECT NO.
PROJECT LOCATION MAP:
THROUGHOUT THE CITY
PROJECT LOCATION:
Throughout the City.
PROJECT DESCRIPTION:
The Pavement Management Program is an ongoing annual program designed
to extend the service life of city streets and to maintain a smooth and safe
driving surface for vehicles. The City utilizes a pavement management
database program to determine pavement management needs for the purpose
of establishing which streets are to be oil sealed, chipped sealed, overlaid or
reconstructed. On a periodic basis the condition of the roads are field surveyed
and the pavement management database is updated to reflect current
conditions. Each year, specific pavement management projects are defined
and funding is transferred into a pavement management project account.
PROJECT NEED:
City streets require annual maintenance to maintain a safe and smooth driving
surface and to extend the useful service life of the streets.
FINANCING:
Purpose
Pavement Management
Pavement Management
Pavement Management
Total Cost =
Estimated Cost Funding Source
$58,710,348
$4,701,088
$12,609,000
$76,020,436
TransNet/Local*
Gas Tax
Other
* Includes $49,993 balance forward from Project No. 38551.
PVMTMGMT Page 248
CAPITAL PROJECT DESCRIPTION
NONE
CIRCULATION SYSTEM STREET PROJECTS - PAVEMENT MANAGEMENT CONCRETE REPAIRS
PROJECT NAME
PROJECT NO.
PROJECT LOCATION MAP:
CITYWIDE
PVMT_MGT
ii vi PI
PROJECT LOCATION:
Citywide.
PROJECT DESCRIPTION:
Replace damaged pavement edges prior to conducting annual pavement
management operations. Repairs include curb, gutter, and sidewalks adjacent
to streets designated for asphalt rehabilitation.
PROJECT NEED:
Concurrent with the annual Pavement Management Program, concrete repair
work is performed on those streets receiving a pavement overlay or slurry seal.
The cost for concrete repair work was paid out of the annual appropriation
for the Pavement Management Program. An annual appropriation for
anticipated concrete repairs will allow for more streets to be included in the
Pavement Management Program.
FINANCING:
Purpose
Construction
Total Cost =
Estimated Cost Funding Source
$3,750,000 GCC
$3,750,000
ft i mm mm i i
Page 249
i i i ti 11 ia i i vi
i i i i
CAPITAL PROJECT DESCRIPTION
CIRCULATION SYSTEM STREET PROJECTS - POINSETTIA LANE EAST OF EL CAMINO REAL
FINANCING PROGRAM
PROJECT NAME
3689
PROJECT NO.
PROJECT LOCATION MAP:PROJECT LOCATION:
Along the future alignment of Poinsettia Lane from El Camino Real east to
El Fuerte Street.
PROJECT DESCRIPTION:
Formation of a financing district/program to guarantee the construction of
Poinsettia Lane to full major arterial standards west of El Camino Real.
The project, in conjunction with the Poinsettia Lane improvements proposed
west of El Camino Real, will complete another east/west arterial linkage from
Melrose Drive to Interstate 5.
PROJECT NEED:
Required pursuant to the City Circulation Element and Growth Management
Program.
FINANCING:
Purpose
Construction
Total Cost =
Estimated Cost
$28,931,541
$28,931,541
Funding Source
Other
POINEAST
Page 250
CAPITAL PROJECT DESCRIPTION
CIRCULATION SYSTEM STREET PROJECTS - PO1NSETTIA LANE WIDENING
(PASEO DEL NORTE TO BATIQUITOS LAN El
PROJECT NAME
NONE
PROJECT NO.
PROJECT LOCATION MAP:
POINWIDE
11 II II II II I 1 11 ft » *
PROJECT LOCATION:
From Paseo Del Norte to Batiquitos Lane.
PROJECT DESCRIPTION:
Widen Poinsettia Lane from Paseo Del Norte to Batiquitos Lane to six lanes by
adding one lane in each direction. Construct curb and gutter, base, asphalt
pavement and sidewalk. Right-of-way is required.
PROJECT NEED:
Required to meet Growth Management Standards.
FINANCING:
Purpose Estimated Cost Funding Source
Design/Construction $2,210,198 TIF
Total Cost = $2,210,198
Page 251
i mm mm mm i r i t i
S I
CAPITAL PROJECT DESCRIPTION
CIRCULATION SYSTEM STREETS PROJECTS - RANCHO SANTA FE ROAD AND
OLIVENHAIN ROAD IMPROVEMENTS
PROJECT NAME
3860
PROJECT NO.
PROJECT LOCATION MAP:
PROJECT
PROJECT LOCATION:
Intersection of Rancho Santa Fe Road and Olivenhain Road.
PROJECT DESCRIPTION:
Complete full intersection improvements to the Rancho Santa Fe Road and
Olivenhain Road intersection to General Plan standards. Extend street
improvements on Rancho Santa Fe Road between the Olivenhain Municipal
Water District access to a distance approximately 200 feet east of the
intersection with Olivenhain Road. Extend street improvements on Olivenhain
Road from the intersection with Olivenhain Road west to meet existing
full-width improvements within the City of Encinitas. The project would involve
right-of-way acquisition, grading, storm drains, removal of existing
improvements and installation of surface improvements, street lights, and
coordination with agencies for utility realignment
PROJECT NEED;
These improvements are required in order to keep intersection capacity at or
below the thresholds dictated by the Growth Management Standards and per
the General Plan for build-out. Full intersection improvements will improve
vehicular circulation and increase safety to serve the public and nearby
developments to the south that will impact the intersection once full occupancy
is reached. The City of Encinitas and Olivenhain Municipal Water District are in
support of the project and will reimburse the City of Carlsbad for their share of
the improvements.
FINANCING:
Purpose Estimated Cost
Design/Construction $3,800,000
Total Cost = $3,800,000
Funding Source
CFD#2
Olivenrsf Page 252
CAPITAL PROJECT DESCRIPTION
CIRCULATION SYSTEM STREET PROJECTS - RANCHO SANTA FE ROAD NORTH PHASE I
PROJECT NAME
3923 & 3190
PROJECT NO.
PROJECT LOCATION MAP:
PROJECT
RSFN_PHI
11 II i 1 PI
PROJECT LOCATION:
Along the future alignment of Rancho Santa Fe Road from La Costa Avenue to
approximately 1,800 feet south of Questhaven Road.
PROJECT DESCRIPTION:
Construction of 4 lanes of Rancho Santa Fe Road to prime arterial standards
including full width grading. Project involves the realignment of Rancho Santa
Fe Road easterly of its present alignment to a location approximately in the
area of the current truck bypass route.
PROJECT NEED:
Required to meet Growth Management Standards.
FINANCING:
Purpose Estimated Cost
Design/Construction $26,406,243
Total Cost = $26,406,243
Funding Source
CFD#2
i r i ii 11 ei
Page 253
1 • I
I i ti ii t i
CAPITAL PROJECT DESCRIPTION
CIRCULATION SYSTEM STREET PROJECTS - RANCHO SANTA FE ROAD NORTH PHASE II
PROJECT NAME
3923 & 3907
PROJECT NO.
PROJECT LOCATION MAP:
PROJECT
PROJECT LOCATION:
Along Rancho Santa Fe Road from approximately 1,800 feet south of
San Elijo Road to Melrose Drive.
PROJECT DESCRIPTION:
Realignment and widening of Rancho Santa Fe Road and construction of new
bridge structures over the San Marcos Creek.
PROJECT NEED:
Required to meet Growth Management Standards.
FINANCING:
Estimated Cost Funding SourcePurpose
Design/Environmental
Bridge
Pipeline Replacement
Total Cost =
$3,100,000
$14,768,000
$773,000
$18,641,000
CFD#2
CFD#2
Water Replacement
RSFNPHII Page 254
CAPITAL PROJECT DESCRIPTION
3880
CIRCULATION SYSTEM STREET PROJECTS - RANCHO SANTA FE ROAD SOUTH (TO ENCINITAS)
PROJECT NAME
PROJECT NO.
PROJECT LOCATION MAP:
PROJECT
RSFSOUTH
I 1 • • II PI
PROJECT LOCATION:
Along Rancho Santa Fe Road south from Olivenhain Road to Encinitas.
PROJECT DESCRIPTION:
Construction of Rancho Santa Fe Road to modified secondary arterial road
standards including full width grading and necessary drainage facilities.
PROJECT NEED:
Required to meet Growth Management Standards for Zone 11 development.
FINANCING:
Purpose Estimated Cost Funding Source
Design/Construction $1,350,000 CFD #2
Total Cost = $1,350,000
II II
Page 255
II II 11 II ft 1 II
i I i i i i I i i t I
CAPITAL PROJECT DESCRIPTION
6005
CIRCULATION SYSTEM STREET PROJECTS - SAN MARCOS BOULEVARD WIDENING PROJECT PROJECT NO.
PROJECT NAME
PROJECT LOCATION MAP:
PROJECT
PROJECT LOCATION:
The San Marcos Boulevard Widening Project extends from Acacia Drive toRancho Santa Fe Road.
PROJECT DESCRIPTION:
The San Marcos Boulevard Widening Project consists of widening San Marcos
Boulevard from the Acacia Drive intersection easterly to Rancho Santa Fe
Road to prime arterial standards. The work includes three through lanes in the
eastbound direction, an exclusive right-turn lane, a bike lane, raised
landscaped median, retaining walls, curbs, gutters, sidewalks, traffic signal
modification, storm drain, and streetlights. In addition, improvements will be
made to the intersection of Rancho Santa Fe Road with San Marcos
Boulevard, including a new traffic signal system designed to current City of
San Marcos standards for two northbound through lanes for Rancho Santa Fe
Road, three eastbound through lanes for San Marcos Boulevard, two left-turn
lanes from eastbound San Marcos Boulevard to northbound Rancho Santa Fe
Road, and two left-turn lanes from northbound Rancho Santa Fe Road to
westbound San Marcos Boulevard. There will also be a pavement overlay of
San Marcos Boulevard from Rancho Santa Fe Road west within the project
limits.
PROJECT NEED:
The San Marcos Boulevard widening from Acacia Drive to Rancho Santa Fe
Road is integral to the Circulation Element Plans for San Marcos, and the
North County Region in general; this project will improve a vital link in the
North County Region's roadway network. The joint construction under one
contract of San Marcos Boulevard Widening and the San Marcos Boulevard
Transmission Main is desirable and in the best interest of CMWD and the
City of San Marcos.
FINANCING:
Purpose
Construction
CM/lnspection
Estimated Cost Funding Source
$2,303,655
$120,534
GCC
GCC
Total Cost = $2,424,189
Construction funds will be reimbursed bv the City of San Marcos.
Page 256
SANMARCOS
CAPITAL PROJECT DESCRIPTION
CIRCULATION SYSTEM STREET PROJECTS - SIDEWALK/STREET CONSTRUCTION PROGRAM
PROJECT NAME
3883 & 3953
PROJECT NO.
PROJECT LOCATION MAP:
N/A
SWCONPGM
i i PI PI mm
PROJECT LOCATION:
Various streets throughout the City.
PROJECT DESCRIPTION:
The Sidewalk/Street Construction Program is an annual program designed to
complete missing links of sidewalk throughout the City. In most cases,
construction of the sidewalk improvements involve construction of adjacent
street improvements to bring them into conformance with City Standards. Each
year, several sidewalk/street projects are selected from the City's missing
sidewalk priority list for inclusion into that year's sidewalk/street construction
project.
PROJECT NEED:
Required to meet the pedestrian circulation policies of the Circulation Element
of the General Plan.
FINANCING:
Purpose Estimated Cost Funding Source
Design/Construction $3,270,672 TIP
Total Cost = $3,270,672
Page 257
mm a 11 mm mm • i * i HB
CAPITAL PROJECT DESCRIPTION
CIRCULATION SYSTEM STREET PROJECTS - TAMARACK AVENUE AND ADAMS STREET
INTERSECTION IMPROVEMENT
PROJECT NAME
NONE
PROJECT NO.
PROJECT LOCATION MAP:
PROJECT
PROJECT LOCATION:
Northeast corner of Tamarack Avenue and Adams Street.
PROJECT DESCRIPTION:
Extend the existing sidewalk northerly on Adams Street, replace the existing
pedestrian access ramp, relocate the existing signal pole, and install new
crosswalk striping.
PROJECT NEED:
The project is needed to meet requirements of the Americans with Disabilities
Act and provide a safe crossing for wheelchair-bound pedestrians.
FINANCING:
Purpose
Design
Construction
Admin/Inspection
Total Cost =
Estimated Cost Funding Source
$10,000
$33,000
$5,500
$48,500
GCC
GCC
GCC
TAMARACK
Page 258
CAPITAL PROJECT DESCRIPTION
CIRCULATION SYSTEM STREET PROJECTS - TRAFFIC MONITORING PROGRAM
PROJECT NAME
3928
PROJECT NO.
PROJECT LOCATION MAP:
N/A
TRAFFMON
ii ii pi
PROJECT LOCATION:
Citywide.
PROJECT DESCRIPTION:
Perform traffic vehicle counts, analyze and report annually on adequacy of
circulation system and identify any intersections or links that fail to meet
Growth Management Standards.
PROJECT NEED:
To ensure that the circulation system meets Growth Management Standards.
FINANCING:
Purpose Estimated Cost Funding Source
Field Counts/Reports $1,280,611 TIP
Total Cost = $1,280,611
Annual Expenditures are approximately $70,000.
» i mm 11 ii * i
Page 259
K1 I
I I I I i i i i I i
CAPITAL PROJECT DESCRIPTION
CIRCULATION SYSTEM STREET PROJECTS - UNDERGROUND UTILITY NO. 17
(ROOSEVELT STREET)
PROJECT NAME
38951
PROJECT NO.
PROJECT LOCATION MAP:PROJECT LOCATION:
Roosevelt Street from Carlsbad Village Drive to Magnolia Avenue.
PROJECT DESCRIPTION:
Place all overhead utilities underground, including electric, telephone, and
cable television lines. Work includes trenching, placing conduit and cable,
restoring surface, and removal of existing poles and all overhead lines.
PROJECT NEED:
This project is identified on the City Council's adopted Underground Priority
List.
FINANCING:
Purpose
Design/Construction
Street Lights
Estimated Cost Funding Source
$850,000
$509,800
20A Funds (SDG&E)
GCC
Total Cost = $1,359,800
20A Funds will be paid to project by SDG&E.
UUD17
Page 260
CAPITAL PROJECT DESCRIPTION
CIRCULATION SYSTEM STREET PROJECTS - VALLEY STREET AND MAGNOLIA AVENUE SIDEWALKS
PROJECT NAME
NONE
PROJECT NO.
PROJECT LOCATION MAP:
PROJECT
SITE
VALLEY
II II PI
PROJECT LOCATION:
Valley Street from Magnolia Avenue to Chestnut Street, and Magnolia Avenue
from Valley Street northeast 470 feet.
PROJECT DESCRIPTION:
Construction of street widening and sidewalk improvements along portions of
Valley Street and Magnolia Avenue in the vicinity of Carlsbad High School,
Valley Middle School, and Magnolia Elementary School.
PROJECT NEED:
The street widening and sidewalks will construct missing pedestrian routes for
students attending Carlsbad High School, Valley Middle School, and Magnolia
Elementary School.
FINANCING:
Purpose
Design
Property Acquisition
Construction
Admin/Inspection
Total Cost =
Estimated Cost
$65,000
$80,000
$390,000
$95,000
$630,000
Funding Source
TIF/TDA
TIF^TDA
TIF/TDA
TIF/TDA
vi mm vi • i • i ei • •VI II VI VI
Page 261