OVERVIEW
The City of Carlsbad Capital Improvement Program (CIP) is a planning document that outlines the
expenditure plan for future capital projects and the corresponding revenues to pay for those
expenditures. The CIP is a financial planning document, not a commitment for spending. All
construction costs are estimates and are reviewed and further refined each year. Spending
authorization is given only at the time the City Council formally adopts the annual budget, and, at
that time, funds are only appropriated for the following fiscal year. The information shown in
subsequent years is to provide the most comprehensive snapshot of all the known future facilities
the City of Carlsbad plans to construct.
The Fiscal Year 2007-08 Capital Improvement Program outlines
approximately $32.8 million in new appropriations to provide additional
funding for the continuation of existing projects as well as funding for
new projects. Projected revenues during the same fiscal year are
estimated at $44.0 million. Revenues are collected as building permits
are issued, and as the need for facilities arises, the money is used to
fund the new facilities. As the City continues to grow and develop, there
is a corresponding increase in the demand for development-related
services and new facilities. To ensure that the necessary infrastructure
and facilities are built on a schedule that meets or exceeds this demand,
the citizens of Carlsbad adopted a Growth Management Plan in 1986. The Growth Management
Plan states that unless a standard level of facilities is available to meet new demands resulting
from the City's growth, development cannot proceed. This Plan is the foundation for making
decisions about the timing and prioritization of the capital projects under consideration. A
discussion of the City's Growth Management Plan is located at the end of this report.
The remainder of the report explains the process and the results of the City's plans for its capital
facilities. A large increase in the cost of construction materials has occurred over the past 3 years
pushing up the cost of the City's projects. This cost escalation has contributed to the projected
shortfall of $12.7 million at buildout in the Public Facilities Fees (PFF) Fund. The PFF Fund
shortfall at buildout in the 2007-08 CIP is down from the $17.0 million projected at buildout in the
2006-07 CIP.
In FY 2007-08 the Carlsbad City Council approved three actions to reduce the PFF balance at
buildout to approximately $12.7 million. The first action was to purchase, in FY 2006-07, a
scheduled land acquisition that was previously budgeted in PFF, with Park-ln-Lieu - Northeast
(PIL-NE) funds. The land acquisition is for a future park site and it is located in the new Robertson
Ranch development. The land acquisition cost for the park is approximately $4.6 million. An
advance from the PFF Fund for $4.6 million would be made in FY 2006-07 and the loan would be
paid back to the PFF Fund once cash is available in the PIL-NE Fund. The second action was to
move approximately $4.8 million of traffic signal and median projects that were previously
budgeted in PFF to the Gas Tax Fund. The third action was to move $6.0 million of the Alga
Norte Pool project to the General Capital Construction Fund. If these recommendations had not
been implemented, the PFF deficit would have been approximately $28 million at buildout.
It is important to note that as the City approaches buildout there are fewer available development
projects that can be charged Public Facilities Fees. While this is not an immediate problem, it is
an indication that the City may not have the money to build all of the projects listed under the PFF
program or will need to pursue other funding options.
1-1
2007-2008 CAPITAL IMPROVEMENT PROGRAM
The Public Facilities Fees is not anticipated to be in deficit until FY 2012 and City staff will
continue to monitor the projected deficit in PFF and bring forward additional solutions at the
appropriate time.
Proposition C was approved by the voters in November 2002. It allowed the City of Carlsbad to
expend over $1 million of general funds to help finance the following projects:
• City/Safety Training Center
• A portion of Cannon Road - East of College (reach 4)
• Trails and Open Space
• A swimming pool complex
As a result of the ballot initiative the City set aside $35 million for Proposition C projects. Currently
of the $35 million, $16.2 million is allocated to Alga Norte Park and approximately $1 million is
allocated for the design of the City/Safety Training Center. The remaining balance of $17.8 million
is available to help fund Proposition C projects.
It is still anticipated that the City will meet all of its growth management standards. This reflects
the Council's continued commitment to construct the facilities as needed to serve the current and
anticipated development occurring throughout the City.
H
m
m
m
HI
m
PROJECT EVALUATION
What is the definition of a CIP project? Projects that are shown in the CIP are generally defined
as any construction (or reconstruction/replacement) of major infrastructure such as streets,
libraries, parks, fire stations and administrative facilities, water, sewer and drainage facilities, and
other facilities that are located on or in the ground. In most cases, the total construction cost of
each of these assets is recorded and tracked as part of the City's inventory of capital
infrastructure assets and other City-owned property.
The CIP and the Operating Budget are integral
parts of the total City financing plan. This year
the CIP review process was analyzed and
process improvements were implemented. Staff
began by evaluating the construction schedules
for City facilities in conjunction with the workload
of the staff needed to complete the projects.
Whenever possible project timing was reviewed
and projects were moved into the appropriate
year. In the FY 2007-08 CIP, there are
approximately 118 projects planned through
buildout. All projects were analyzed using the
criteria shown in the table. An evaluation of the
availability of capital construction funds as well as
operating funds was then factored into the
evaluation process.
Is the project required to ensure the health
and safety of the citizens, as the result of a
legal mandate, or to maintain compliance with
the City's Growth Management Plan? Are
operating funds available to operate the
facility?
2. Is the project needed soon for growth
management compliance?
3. Is the project needed now for other City
standards (example: ball field standards)?
4, Does the project complete or provide part of
the basic infrastructure (example: a linking
road segment)?
5. Are there other reasons to construct the
project (example: timing or funding
opportunity, public demand)?
I-2
2007-2008 CAPITAL IMPROVEMENT PROGRAM
Building Cost Index
Due to the recent volatility in construction costs,
capital project costs were updated to reflect the latest
increases in materials costs. This was done through
either a detailed review of the cost components, or, in
cases where the project is only in its conceptual
stages, by increasing the total cost by the Engineering
News Record (ENR) index. As seen in the chart, the
past several years have seen large building cost
increases; 9.7% in 2004, 4.6% in 2005 and 3.6% in
2006. The ENR is forecasting that annual inflation for
building costs could remain in the 3% to 4% range in
2007.
CAPITAL PROJECTS
The following two sections provide information about the major capital projects. The first section
focuses on projects planned in the next five years, and the second section contains an overview
of the entire expenditure plan through the buildout of the City. All construction costs are estimates
and only projects scheduled for FY 2007-08 are appropriated. The information shown in the
future years reflect the most comprehensive snapshot of the known future facilities and their
associated cost at this point in time.
THE NEXT FIVE YEARS...
PARK PROJECTS
The City has planned a number of park projects over the next 5 years which will enhance the
recreational opportunities for Carlsbad's residents and allow the City to meet the standards for
park acreage as set forth in the growth management plan. Some of the more significant projects
are listed below.
• Alga Norte Park and Aquatic Center - This park site consists of 30 acres in the Southeast
Quadrant with planned amenities that include ball fields, soccer fields, picnic areas, tot lots, a
skate park, a dog park, restrooms, parking facilities, and an aquatic center. The aquatic center
will include a 50-meter competition pool, a 12-lane instructional pool and a therapy pool as well as
a water play area with slides. A swimming pool complex was one of the projects approved by the
voters through Proposition C in 2002. The total cost of the park is estimated to be $22.1 million.
The total cost of the aquatic center is estimated to be $28.3 million. At this time, construction is
scheduled to start in the winter of 2007. Construction will take approximately 2 years.
• Pine Park Community Center - The plan to construct a 20,000 square foot community facility
and gymnasium at Pine Avenue Park has not changed. The facility is planned to include
basketball, volleyball, gymnastics, multi-purpose rooms, meeting rooms, a teen center and office
space. Design of this $9.4 million facility is still expected to begin in FY 2009-10 and construction
is still scheduled to begin in FY 2010-11.
• Poinsettia Tennis Courts - Plans are currently underway to
build seven tennis courts with lighting at the Poinsettia Park. The
facility will also receive additional parking and construction is
scheduled to begin in FY 2008-09. The estimated cost of the
Tennis Courts and Parking is $2.1 million.
• Poinsettia Park Community Center - Phase II of this 42-acre
park includes amenities such as a community facility, gymnasium,
enclosed soccer field, tot lot, picnic areas, tennis complex,
clubhouse, stadium court and additional parking. The cost has been escalated to reflect inflation
I-3
2007-2008 CAPITAL IMPROVEMENT PROGRAM
and the revised cost is now expected to be approximately $12.5 million. The timing of the design
has not changed and is still scheduled to begin in FY 2010-11 and the construction start is still FY
2011-12.
CIVIC FACILITIES
Civic facilities include a variety of facilities from which the City can offer its services to the public.
Many of these are still in the preliminary design stage and will be further defined over the next
several years.
• Civic Center - The Civic Center will consolidate City administrative operations and facilities
into a more centralized location. It also may include a variety of other services and recreational
opportunities for citizens and visitors. Council, citizens and members of the business community
have been participating in a visioning process to determine the anticipated needs for the citizens
and for the City. Once the process is complete, a site will be chosen and design and construction
can begin.
• Public Works Center - The project is for the construction of the Public Works Center and
associated improvements. It includes offices, shops, a yard, warehouse and parking to
accommodate the Public Works Department. The cost has been escalated to reflect inflation and
the revised cost is now approximately $27.3 million without any land acquisition costs.
• Safety Training Center - It is necessary to relocate the Police Department's shooting range
which was located on the new golf course property, The Crossings at Carlsbad. In addition, there
is a need for specialized training facilities for other public safety purposes. This project was
authorized under Proposition C, which was approved in 2002. Preliminary design work is
currently underway. In addition to a shooting range, the facility may include a fire training tower,
residential training prop, fire administration building with classroom and storage facilities. There is
currently $950,000 budgeted for design only. Once the design is .complete the construction
budget will be developed and funding sources will need to be identified.
• Library Learning Center - This project is to provide a permanent location for the Adult
Learning and the Centra de Information programs. The existing building adjacent to Holiday Park
is currently being remodeled and a second story will be added.
• Fire Station No. 6 Relocation - Fire Station No. 6 is currently
located in a temporary facility in the southeast quadrant of
Carlsbad. The relocation of this station to a new 6,200 square
foot permanent facility along the east side of Rancho Santa Fe
Road is progressing and a contract has been awarded for
construction. Total cost is approximately $5.8 million. This fire
station is required to help ensure a five-minute response time
within the southeast part of the City as development in that area
occurs.
• Fire Station No. 3 Relocation - Fire Station No. 3 is currently located at the corner of Chestnut
and Catalina. As the City grows eastward, relocation of this station is needed to help ensure the
five-minute response time. The new station is budgeted as a 6,200 square foot facility and the
current proposed site is next to Calavera Hills Community Park. The suitability of this location is
currently under review. Total cost is projected at $6.8 million and includes $1 million for land
acquisition.
I-4
2007-2008 CAPITAL IMPROVEMENT PROGRAM
STREET PROJECTS
Traffic congestion continues to be one of the top concerns among citizens. To help improve the
flow of traffic throughout Carlsbad and to keep the City's streets in top condition, there are a
number of street projects expected to be completed in the next five years. Some of the larger
street projects include:
• Faraday Avenue and Melrose Drive Extensions east of El Camino Real - This project
encompasses the extension of Melrose Drive from Palomar Airport Road to the Carlsbad/Vista
city limits and the extension of Faraday Avenue from Orion Way to Melrose Drive in Vista. The
project would include the reconstruction of a portion of existing Melrose Drive in the City of Vista
and the construction of a bridge over the Agua Hedionda Creek along Faraday Avenue. This
project is being built by the developers in the area and reimbursed from the proceeds of a bond
issue. Community Facilities District #3 is the mechanism for the issuance and repayment of the
debt.
• Pavement Management - A street can last a lifetime if it is properly maintained. Applying seals
and overlays when roadways are beginning to show signs of distress can minimize the more
expensive repair/reactive maintenance activities. The proactive approach consists of the
scheduled application of a seal or overlay once every seven years. By using the proactive
approach the City can efficiently maintain over 330 miles of public roadways at an annual cost of
approximately $3.4 million.
• El Camino Real Widening - Tamarack to Chestnut - An outside lane will be added to widen
the street to full prime arterial road standards. The project will include curb, gutter, sidewalk,
pavement and streetlights. The total cost of the project will be $3.3 million and the project will
start in FY 2007-08.
• Concrete Repair - This is a companion program to the pavement management program. It will
insure that curbs, gutters and sidewalks are also properly maintained. By allocating the funding,
both pavement and concrete replacements can be accomplished at the same time. This will help
maximize efficiencies and reduce inconvenience to the citizens. There is
$350,000 budgeted in FY 2007-08 for this program. :!
WATER/ SEWER PROJECTS
The City's water and sewer projects are a vital component to the continued
health and welfare of its citizens. Most new lines are built and paid for by
developers. As the City ages, the number of these projects will grow as it
becomes necessary to repair and replace the lines that are being built
today.
• Vista/Carlsbad Interceptor - Reaches 1, 2, 3, 11, 13 to 15, and the Agua Hedionda lift station
are scheduled in the next five years. These projects are required to handle buildout flows and
replace deteriorated pipelines. The projects are predominantly funded by the City of Vista,
depending on the project, and the City of Vista's share of the costs are between 60% - 90% of the
total project cost. The total estimated costs for all of the projects are approximately $29.7 million.
• Water Lines - Several major water lines are scheduled for construction within the next five
years:
Carlsbad Boulevard - South of Avenida Encinas
College Boulevard - Various sections
Faraday Avenue extension
Melrose Drive from Palomar Airport Road to Faraday
I-5
2007-2008 CAPITAL IMPROVEMENT PROGRAM
CAPITAL PROJECTS THROUGH BUILDOUT
The CIP for FY 2007-08 to Buildout outlines approximately 118 future projects at a cost of
approximately $411.8 million as shown below.
CIP Projects - All Future Projects
Type of Project
Streets/Circulation
Civic Projects
Parks
Sewer
Water
Drainage
Other (loans)
Total Future
Quantity
25%
22%
19%
14%
9%
5%
6%
100%
Total Cost
102,611,948
90,685,042
76,597,831
59,836,050
38,473,615
21,401,293
22,163,365
$411,769,144
One of the largest expenditure categories is for park and recreational facility construction and
acquisition projects, which total approximately $76.6 million. Park projects planned within all
quadrants of the City are listed below in addition to when the design and/or construction is
expected to begin. More detail follows on specific projects not discussed earlier in this report.
PARK PROJECTS BY QUADRANT
Northwest Quadrant
Pine Avenue Park Community Building: 2010-11
Southwest Quadrant
Poinsettia Park Community Building: 2011-12
Aviara Community Building: 2017-22
Northeast Quadrant
Park Site Development: 2017-22
Southeast Quadrant
Alga Norte Park: 2009-10
Alga Norte Aquatic Center: 2009-10
Leo Carrillo Park Phase III: 2017-22
Citvwide Park and Recreational Projects
Municipal Golf Course: 2007-08
Veteran's Memorial Park: 2012-17
Business Park Recreational Facility: 2017-22
• Aviara Community Facility - Located in the southwest quadrant of the city, this project includes
the construction of an 18,000 square foot community facility that would include meeting and
activity rooms, as well as park offices.
• Leo Carrillo Park Phase III - This park was once part of the original
2,538 acre working rancho, home to actor Leo Carrillo, his wife Edith, and
their daughter Antoinette. It is located in the southeast quadrant,
approximately one mile south of Palomar Airport Road. Initial restoration
was completed and the park opened to the public in 2003. Future work
includes renovation of the barn into a small theatre, restoration of the
cantina, equipment shed, blacksmith shop, carriage house and water tank. A
botanical garden, picnic areas, and trails will also be added to enhance the
visitor's experience at the ranch.
I-6
2007-2008 CAPITAL IMPROVEMENT PROGRAM
• Leo Carrillo Event Area Expansion - The popularity of Carrillo Ranch for parties and weddings
has continued to increase every year. In FY 2007-08, the design of a new patio area at Leo
Carrillo Ranch is being proposed. The flagstone patio, seat wall, lighting, landscape and
additional service access will provide more level floor space for events and potentially increase
additional future rental revenue.
• Veterans Memorial Park - This project is located south and east of Agua Hedionda Lagoon
adjacent to the City Golf Course, The Crossings at Carlsbad. The Master Plan includes the
following improvements: community leisure needs, open space interpretive area, parking, and
maintenance facility. Other suggested uses for this park include an amphitheater complex, sports
complex, conference center and numerous other active/passive recreation amenities.
Construction of Civic facilities such as libraries, administrative facilities, police and fire facilities are
currently estimated at $90.7 million of the total planned capital expenditures to buildout.
Approximately 25% of future expenditures are planned for street and traffic signal construction
projects. Included in this category is construction of major roadways that will add east to west and
north to south connections as well as provide additional routes to the neighboring cities of
Oceanside, Vista, and San Marcos. Sections of these roads are already under construction by
developers. Additional roadway projects include replacement of the Carlsbad Boulevard Encinas
Creek Bridge, several road-widening projects, $4.2 million for concrete repair work and over $85.3
million for future pavement overlay. Additional traffic signals are expected to cost approximately
$3.7 million.
Sewer and drainage projects are expected to cost over $81.2 million, which includes over $25
million in sewer replacement projects. Funding is also provided for the repayment of bonds for
the expansion of the Encina Wastewater Facility, and the Encina Water Pollution Control Facility
projects.
Future water projects include construction of new waterlines, both potable and recycled,
concurrent with new development. Some of the major areas in which these installations or
upgrades are planned include segments of College Boulevard and El Fuerte, and along El
Camino Real. Replacement of existing potable and recycled waterlines is also included in this
category, and additional reservoirs are planned to increase storage for ultimate demands.
Specific timing and cost estimates for all capital projects are identified in the Detail Schedule of
Capital Projects (FY 2007-08 to Buildout) following this narrative.
UNFUNDED PROJECTS
There are several projects identified in the CIP for which there is no identifiable funding source.
The City will investigate obtaining possible outside funding such as Federal and State grants,
loans, or other financing sources. Once funding is identified for these projects the project costs
will have to be reviewed and updated to reflect actual cost estimates. The unfunded projects do
not receive annual inflationary increases. These projects are:
• El Camino Real Widening from Cassia Road to Camino Vida Roble
• Palomar Airport Road Widening and Bridge Reconstruction
• Poinsettia Lane - REACH E ($11M funded through BTD #2)
• Cannon Road - REACH 4B - College/Cannon to City Limits
• Cannon Lake Park (6.7 Acres)
• Hosp Grove/Buena Vista Lagoon Improvements
• Pine Ave. Park - Madison Property
• Pine Ave. Park - Restrooms/Storage
I-7
2007-2008 CAPITAL IMPROVEMENT PROGRAM
This year two projects at Pine Avenue Park were added to the unfunded list. The two projects at
Pine Park are currently being reviewed by staff and staff plans to bring Council funding options on
these projects in the future.
FUTURE GROWTH AND DEVELOPMENT
There are a variety of revenues that are used to fund the capital
projects. In order to estimate future revenues from development,
several assumptions about the rate and type of future development
need to be made. These assumptions can change from year-to-
year and correlate with the economic climate.
Every year, City staff evaluates all existing and future private development projects and compares
this information to the buildout capacity of the City using adopted general plans. Information about
existing development activity combined with estimates of how remaining net developable land
might develop are then summarized to prepare future projections about when and where
residential and non-residential development will occur. Finance Department staff prepare cash
flow schedules using current fund balances combined with future estimated fees paid by those
developments, then compares the available funds to the expenditure plan to ensure that funding
will be sufficient for construction of the capital projects as planned in the CIP. In addition to
evaluating whether or not capital funds are sufficient, significant operating cost impacts and
availability of staff resources are also used to evaluate the timing of projects. Where funding
discrepancies occur, alternative financing methods and project timing are again evaluated and
recommendations are made to resolve the discrepancies.
Residential development is expected to taper off in the future. The number of annual building
permits issued is projected to decline compared to the previous five-year period. The
development schedules of the remaining vacant parcels is driving the timing of the future units,
rather than economic or market conditions. There are approximately 4,800 units remaining before
the City is predominantly built out.
Residential development for FY 2007-08 is projected at 251 units with an average about 423 units
per year over the next five years. This is compared to an average of over 1,002 units per year for
the previous five-year period. The decline is due to the dwindling supply of developable land.
Residential Units Trend 2000 to 2012
Permits Issued
2000 2002 2004 2006 2008 2010 2012
The amount of non-residential development is projected to also decline slightly over the next five
years. The average annual square feet of non-residential development for the past 5 years was
about 793,000. For FY 2007-08, the estimate is for 471,000 square feet, and the average annual
development for the next 5-year period is approximately 735,000 square feet per year. Projects
I-8
2007-2008 CAPITAL IMPROVEMENT PROGRAM
include several neighborhood commercial/retail developments located in or near the areas where
most of the residential development has occurred or where new development is planned over the
next several years. In the southeast quadrant, commercial projects include retail and restaurants,
a theater, a daycare, and church. Sunny Creek Plaza is a planned commercial development
located east of El Camino Real at College Boulevard next to the Sunny Creek residential
neighborhood, and the Bressi Ranch area will also have a commercial development. Other
commercial developments are planned at Calavera Hills and at Poinsettia Shores. Industrial
development consists of various new office and industrial projects, as well as expansion of
existing projects at Kelly Corporate Center. Development estimates provide the data and basis
for estimating future fee revenues, which are calculated by multiplying each applicable
development fee by the estimated number of dwelling units and/or square feet of construction
expected during each year. The following table shows the number of residential units and non-
residential square feet of development used in calculating estimated revenues for FY 2007-08 and
subsequent years to buildout.
Projected Development
Residential and Non-Residential Construction
Year
2006-2007 current
2007-2008
2008-2009
2009-2010
2010-2011
2011-2012
Years 6- 10
Years 1 1 -buildout
Total Future
Residential
Units
422
251
579
669
313
305
1,474
1,067
4,658
Non-Residential
Square Feet
1,417,863
471 ,596
1,147,590
824,067
651,135
579,261
4,286,389
2,700,658
10,660,695
REVENUES
Revenues for Capital Projects from now until buildout are estimated to be approximately $597.6
million and are segregated into five major categories: (1) fees generated by development in
Carlsbad, (2) special district fees and taxes (Community Facilities Districts and Bridge and
Thoroughfare Benefit Districts), (3) Water and Sewer replacement reserves, (4) Infrastructure
Replacement Funds (other than sewer and water), and (5) other sources including grants, bond
issues, and contributions from other agencies.
Funding Sources FY 2007-08 to Buildout
Total Revenue = $597.6 million
In Millions
17S-S
%ir°A '"W °V~. ^ °«T
1-9
2007-2008 CAPITAL IMPROVEMENT PROGRAM
Approximately 21% of all capital revenue is received as a result of development, and is dependent
upon assumptions made about the City's annual growth in dwelling units and commercial/
industrial square feet. Development revenues include Public Facilities Fees (PFF), Traffic Impact
Fees (TIF), Park-ln-Lieu Fees (PIL), Planned Local Drainage (PLD) Fees, Water Connection Fees
(MFF), and Sewer Connection charges. Revenue from special districts, such as Community
Facilities Districts (CFD) and Bridge and Thoroughfare Benefit Districts (BTD) comprise 9% of the
total. Water and Sewer replacement revenues generated by user fees equal approximately 22%
of total revenues, and are used to pay for replacement of existing water and sewer facilities.
Infrastructure replacement revenues, equal to 26%, are transfers from the City's General Fund
which are being set aside to pay for replacement of major capital facilities other than sewer and
water facilities. The remaining 22% consists of revenues from other agencies and include federal
and state grants, the county sales tax program (TransNet), redevelopment agency revenue, golf
course funding, and contributions from cities and other agencies.
CALCULATION OF FUTURE FEES
The revenue projections of the Capital Improvement Program reflect the growth assumptions
identified in the previous section. The following information delineates how those assumptions
were applied to estimate future development revenues. The mix of multi-family and single-family
residential units is assumed to be 35% and 65% respectively and reflects the anticipated mix of
residential development for each Local Facilities Management Zone. The building permit valuation
used for computing Public Facilities Fees is $166,900 per multi-family dwelling unit, and $285,600
per single-family dwelling unit. A building permit valuation of $38 per square foot of construction
is used to calculate non-residential Public Facilities Fees.
In order to calculate estimated revenues for Traffic Impact Fees (TIF), the number of average
daily trips was computed for each type of development use. A multi-family residential dwelling unit
is assigned eight trips per day and a single-family unit is assigned ten trips per day. Each
residential trip is valued at the FY 2007-08 TIF of $107. The trips-per-day value for commercial
and industrial buildings are averaged at 30 trips per 1,000 square feet of development, although
the actual volume of trips generated by commercial/industrial building can vary widely depending
on the ultimate land use. The value assigned to each commercial/industrial trip is $41.
CFD #1 is a citywide district established to finance various civic facilities required under the City's
Growth Management Plan. CFD #3 was established for the Faraday Avenue and Melrose Drive
Extensions east of El Camino Real. This project encompasses the extension of Melrose Drive
from Palomar Airport Road to the Carlsbad/Vista city limits and the extension of Faraday Avenue
from Orion Way to Melrose Drive in Vista.
Park-in-Lieu Fees are collected for the purchase and development of
parkland within each quadrant of the City, and the fees are based on
the acquisition cost of parkland. Projects in the CIP funded with Park-
in-Lieu Fees include future park site acquisition, development and
restoration.
There are two existing Bridge and Thoroughfare Fee Districts (BTD), which were formed by
property owners to finance specific road construction projects located within each of the district
boundaries. Poinsettia Lane - Aviara Parkway (BTD No. 2) was formed to finance the
construction of Poinsettia Lane between Aviara Parkway and El Camino Real and Aviara Parkway
between Palomar Airport Road and Poinsettia Lane. BTD No. 3 (Cannon Road West) was
formed to fund portions of Cannon Road from Interstate 5 to El Camino Real. Although
construction of this project is complete, revenues collected from future development within the
district will be used to repay an advance that provided interim funding to complete the project.
1-10
2007-2008 CAPITAL IMPROVEMENT PROGRAM
SUMMARY
The FY 2007-08 to Buildout CIP is being driven by the City's commitment to ensure that facilities
are available to service the developing areas as well as the current residents. Carlsbad's
philosophy has been to build quality capital facilities, which meet, and at times exceed, Growth
Management standards. Phasing projects over a period of years to match funding availability for
construction and operations is often used to meet the needs of growth management. The FY
2007-08 to Buildout Capital Improvement Program reflects the commitment of Carlsbad's Council
and staff to continue providing its residents with a better quality of life.
GROWTH MANAGEMENT PLAN
The Growth Management Plan was developed and voted into law by the citizens of Carlsbad in
1986. The plan was established to manage development within the City by linking residential,
commercial, and industrial development directly to standards for availability of public services and
facilities.
The Growth Management Plan has established precise standards for eleven public facilities.
Standards must be met at all times as growth occurs. Facilities for which standards have been
established are as follows:
- City Administrative - Library
- Wastewater Treatment - Parks
- Circulation - Drainage
- Fire - Open Space
- Schools - Sewer Collection
- Water Distribution
The plan requires that appropriate public facilities be available, in conformance with the adopted
performance standards, as development occurs. Unless all of the eleven public facility standards
have been met, no new development can occur.
The Growth Management Plan impacts both the Operating Budget and the Capital Improvement
Program. The detailed level of planning required by Growth Management has allowed Carlsbad's
Capital Improvement Program to anticipate the funding needed for capital improvements through
buildout of the City. The timing of construction of facilities is governed by the rate of development
and the eleven performance standards. New public facilities often require additional staffing and
other resources, which affects the Operating Budget. Facilities such as community centers,
parks, and fire stations have been constructed and opened to the public under this program.
The Capital Improvement Program has been designed to specifically address areas where new or
expanded facilities will be needed to maintain compliance with the adopted performance
standards. With the adoption of the FY 2007-08 CIP, compliance with the Growth Management
Plan is continued.
1-11
CITY OF CARLSBAD
CAPITAL FUNDS
PROJECTED FUND BALANCES FOR FY 2006-2007
FUND
BTD#2 - POINSETTIA LANE/AVIARA PKWY
BTD#3 - CANNON ROAD WEST
CFD#1 -CITYWIDE
GAS TAX
GENERAL CAPITAL CONST.
GOLF COURSE
GRANTS - FEDERAL
GRANTS - STATE
INFRASTRUCTURE REPLACEMENT
OTHER
PARK FEE ZONES 5,13,16
PARK-IN-LIEU NE
PARK-IN-LIEU NW
PARK-IN-LIEU SE
PARK-IN-LIEU SW
PLANNED LOCAL DRAIN'S
PUBLIC FACILITIES FEE
RANCHO SANTA FE ROAD PROJECT
REDEVELOPMENT VILLAGE
REDEVELOPMENT SCCRDA
SEWER BENEFIT AREAS
SEWER CONNECTION
SEWER REPLACEMENT
TDA
TRAFFIC IMPACT FEE
TRANSNET/BIKE
TRANSNET/HIGHWAY
TRANSNET/LOCAL
TRANSNET/STP
WATER - MAJOR FACILITY
WATER - RECYCLED WATER
WATER - REPLACEMENT
TOTAL
JULY 1,2006
UNRESERVED
BALANCE
8,374,804
1,155,699
50,375,883
5,760,304
50,915,753
2,222,293
(347,726)
16,701
22,089,463
26,541,772
1,207,366
813,511
1,178,614
2,075,205
829,979
9,731 ,604
38,839,543
11,091,168
790,506
90,280
4,776,096
30,884,082
22,285,948
0
11,231,717
228,295
1,196,773
5,010,069
305,278
18,114,885
3,008,622
18,690,445
349,484,932
ESTIMATED
REVENUES
1,336,784
680,343
5,765,973
2,074,752
2,626,024
44,848,207
947,620
705,553
8,448,873
15,693,889
297,986
4,398,262
273,305
189,869
229,757
1,002,540
5,886,170
4,720,307
715,000
250,000
720,322
2,418,232
4,507,226
100,000
1,985,707
95,834
51,690
8,797,874
13,237
2,336,465
7,224,426
18,674,645
148,016,870
ESTIMATED
EXPENDITURES
0
433,845
4,332,587
3,133,566
3,798,581
42,239,391
255,633
15,362
1 ,965,693
8,898,685
0
433,328
576,000
0
0
606,469
2,049,092
4,650,486
30,454
43,139
159,298
903,964
2,680,360
0
2,089,121
215,762
16,035
4,580,125
0
2,702,142
3,296,386
3,815,944
93,921,448
ESTIMATED
DEBT SERVICE
LOANS & OTHER
0
45,167
206,649
277,698
0
166,103
0
705,245
0
171,780
0
0
0
0
0
426,305
0
35,450
71,719
0
0
2,342,060
350,600
0
0
0
2,301
1 ,035,843
223,464
0
6,000,000
0
12,060,384
JUNE 30, 2007
PROJECTED
BALANCE
9,711,588
1,357,030
51,602,620
4,423,792
49,743,196
4,665,006
344,261
1,647
28,572,643
33,165,196
1,505,352
4,778,445
875,919
2,265,074
1 ,059,736
9,701,370
42,676,621
11,125,539
1,403,333
297,141
5,337,120
30,056,290
23,762,214
100,000
11,128,303
108,367
1,230,127
8,191,975
95,051
17,749,208
936,662
33,549,146
391,519,970
1-12
CITY OF CARLSBAD
CAPITAL FUNDS
PROJECTED FUND BALANCES FOR FY 2007-2008
FUND
BTD#2 - POINSETTIA LANE/AVIARA PKWY
BTD#3 - CANNON ROAD WEST
CFD#1 -CITYWIDE
GAS TAX
GENERAL CAPITAL CONST.
GOLF COURSE
GRANTS - FEDERAL
GRANTS - STATE
INFRASTRUCTURE REPLACEMENT
OTHER
PARK FEE ZONES 5,13,16
PARK-IN-LIEU NE
PARK-IN-LIEU NW
PARK-IN-LIEU SE
PARK-IN-LIEU SW
PLANNED LOCAL DRAIN'G
PUBLIC FACILITIES FEE
RANCHO SANTA FE ROAD PROJECT
REDEVELOPMENT VILLAGE
REDEVELOPMENT SCCRDA
SEWER BENEFIT AREAS
SEWER CONNECTION
SEWER REPLACEMENT
TDA
TRAFFIC IMPACT FEE
TRANSNET/BIKE
TRANSNET/HIGHWAY
TRANSNET/LOCAL
TRANSNET/STP
WATER - MAJOR FACILITY
WATER - RECYCLED WATER
WATER - REPLACEMENT
TOTAL
JULY 1,2007
PROJECTED
BALANCE
9,711,588
1 ,357,030
51 ,602,620
4,423,792
49,743,196
4,665,006
344,261
1,647
28,572,643
33,165,196
1 ,505,352
4,778,445
875,919
2,265,074
1 ,059,736
9,701,370
42,676,621
11,125,539
1 ,403,333
297,141
5,337,120
30,056,290
23,762,214
100,000
11,128,303
108,367
1,230,127
8,191,975
95,051
17,749,208
936,662
33,549,146
391,519,970
ESTIMATED
REVENUES
131,310
54,797
1,739,179
1,918,628
750,000
0
1 ,963,578
0
7,801,000
0
44,346
0
149,905
80,187
203,140
244,733
2,388,044
7,978,743
100,000
0
151,538
4,033,935
5,280,000
0
594,781
0
0
3,722,000
0
740,931
0
3,934,010
44,004,785
06/30/2007
CONTINUING
APPROPR.
349,302
0
1 ,799,345
2,515,418
23,123,305
3,907,140
344,262
0
2,056,112
31,236,207
0
4,550,020
0
0
219,100
2,769,097
28,012,884
4,270,438
1,227,013
292,678
1,181,774
13,196,454
10,286,739
100,000
2,841,839
90,262
964,021
2,224,135
0
2,759,024
936,662
9,461,338
150,714,569
07/01/2007
NEW
APPROPR.
0
600,000
110,000
618,550
6,312,545
0
405,429
0
1,106,750
0
0
0
0
20,550
0
0
6,255,155
0
0
0
2,000,000
3,304,860
3,536,446
0
396,000
0
0
6,714,571
0
0
0
1 ,459,923
32,840,779
2007-2008
TOTAL CIP
APPROPR.
349,302
600,000
1,909,345
3,133,968
29,435,850
3,907,140
749,691
0
3,162,862
31,236,207
0
4,550,020
0
20,550
219,100
2,769,097
34,268,039
4,270,438
1,227,013
292,678
3,181,774
16,501,314
13,823,185
100,000
3,237,839
90,262
964,021
8,938,706
0
2,759,024
936,662
10,921,261
183,555,348
JUNE 30, 2008
PROJECTED
BALANCE
9,493,596
811,827
51 ,432,454
3,208,452
21,057,346
757,866
1,558,148
1,647
33,210,781
1 ,928,989
1 ,549,698
228,425
1 ,025,824
2,324,71 1
1,043,776
7,177,006
10,796,626
14,833,844
276,320
4,463
2,306,884
17,588,911
15,219,029
0
8,485,244
18,105
266,106
2,975,269
95,051
15,731,115
0
26,561,895
251,969,407
1-13
CITY OF CARLSBAD
CAPITAL FUNDS
REVENUES ACTUAL AND ESTIMATED
FUND
BTDf2 - POINSETTIA LANE/AVIARA PKWY
BTD#3 - CANNON ROAD WEST
CFD#1 -CITYWIDE
GAS TAX
GENERAL CAPITAL CONST.
GOLF COURSE
GRANTS - FEDERAL
GRANTS - STATE
INFRASTRUCTURE REPLACEMENT
OTHER
PARK FEE ZONES 5,13,16
PARK-IN-LIEU NE
PARK-IN-LIEU NW
PARK-IN-LIEU SE
PARK-IN-LIEU SW
PLANNED LOCAL DRAIN'G
PUBLIC FACILITIES FEE
RANCHO SANTA FE ROAD PROJECT
REDEVELOPMENT VILLAGE
REDEVELOPMENT SCCRDA
SEWER BENEFIT AREAS
SEWER CONNECTION
SEWER REPLACEMENT
TDA
TRAFFIC IMPACT FEE
TRANSNET/BIKE
TRANSNET/HIGHWAY
TRANSNET/LOCAL
TRANSNET/STP
WATER - MAJOR FACILITY
WATER - RECYCLED WATER
WATER - REPLACEMENT
TOTAL CAPITAL FUNDS
2003-2004
ACTUAL
REVENUE
2,082,421
0
4,724,143
1,785,785
558,927
0
361,048
52,028
3,946,110
11,111,949
47,366
125,004
514,627
30,554
35,582
1,241,432
5,224,343
4,691,448
7,547
245,691
557,429
1,813,446
4,198,825
78,572
975,812
110,471
14,861
4,120,403
1,479
3,064,296
9,009,877
2,877,307
63,608,783
2004-2005
ACTUAL
REVENUE
1,998,341
44,911
7,100,722
1,955,691
2,459,316
354,593
667,538
1,852
4,405,430
29,398,816
99,420
48,251
50,048
1,186,959
462,471
1,711,440
10,023,947
5,191,343
1,445,277
584,604
801,202
2,416,264
1,641,162
5,325
2,014,264
2,797
47,046
2,873,656
8,576
5,164,198
4,678,829
1 ,393,946
90,237,635
2005-2006
ACTUAL
REVENUE
1,376,967
94,297
4,595,150
1,974,975
2,699,589
551,150
1,127,704
429,683
4,787,770
14,888,674
303,004
216,055
577,594
342,046
180,662
974,397
7,177,940
5,393,508
1,058,550
74,118
362,151
1,672,308
5,271,251
136,933
1 ,407,742
65,859
28,618
2,320,925
6,935
3,386,838
10,878,643
5,495,772
79,857,808
2006-2007
ESTIMATED
REVENUE
1,336,784
680,343
5,765,973
2,074,752
2,626,024
44,848,207
947,620
705,553
8,448,873
15,693,889
297,986
4,398,262
273,305
189,869
229,757
1,002,540
5,886,170
4,720,307
715,000
250,000
720,322
2,418,232
4,507,226
100,000
1 ,985,707
95,834
51,690
8,797,874
13,237
2,336,465
7,224,426
18,674,645
148,016,870
2007-2008
ESTIMATED
REVENUE
131,310
54,797
1,739,179
1,918,628
750,000
0
1 ,963,578
0
7,801,000
0
44,346
0
149,905
80,187
203,140
244,733
2,388,044
7,978,743
100,000
0
151,538
4,033,935
5,280,000
0
594,781
0
0
3,722,000
0
740,931
0
3,934,010
44,004,785
Note: Revenues include interfund loans and transfers in.
1-14
CITY OF CARLSBAD
CAPITAL FUNDS
BUDGET EXPENDITURE SCHEDULE
FUND
BTD#2 - POINSETTIA LANE/AVIARA PKWY
BTD#3 - CANNON ROAD WEST
CFD#1 -CITYWIDE
GAS TAX
GENERAL CAPITAL CONST.
GOLF COURSE
GRANTS - FEDERAL
GRANTS - STATE
INFRASTRUCTURE REPLACEMENT
OTHER
PARK FEE ZONES 5,13,16
PARK-IN-LIEU NE
PARK-IN-LIEU NW
PARK-IN-LIEU SE
PARK-IN-LIEU SW
PLANNED LOCAL DRAIN'G
PUBLIC FACILITIES FEE
RANCHO SANTA FE ROAD PROJECT
REDEVELOPMENT VILLAGE
REDEVELOPMENT SCCRDA
SEWER BENEFIT AREAS
SEWER CONNECTION
SEWER REPLACEMENT
TDA
TRAFFIC IMPACT FEE
TRANSNET/BIKE
TRANSNET/HIGHWAY
TRANSNET/LOCAL
TRANSNET/STP
WATER - MAJOR FACILITY
WATER - RECYCLED WATER
WATER - REPLACEMENT
TOTAL CAPITAL FUNDS
2004-2005
ACTUAL
140,577
141,438
108,553
1,445,466
1,639,191
2,571,508
667,538
54,573
749,281
12,631,957
0
1,145,563
612,655
0
0
742,464
8,027,086
11,798,358
0
21,247
3,020,915
3,902,475
1,565,606
83,792
676,082
-
701,207
3,822,805
9,930
(68,980)
12,581,542
1 ,930,382
70,723,21 1
2005-2006
ACTUAL
116
20,312
188,281
2,735,687
2,650,728
26,426,592
1,475,430
445,294
1,459,679
19,972,734
0
216,470
0
0
0
1,230,192
7,653,585
7,944,216
24,576
225,217
629,637
1 ,244,997
3,927,937
136,933
509,41 1
32,720
76,019
4,668,118
4,905
501 ,035
10,004,001
3,347,918
97,752,740
2006-2007
ESTIMATED
0
479,012
4,539,236
3,41 1 ,264
3,798,581
42,405,494
255,633
720,607
1,965,693
9,070,465
0
433,328
576,000
0
0
1,032,774
2,049,092
4,685,936
102,173
43,139
159,298
3,246,024
3,030,960
0
2,089,121
215,762
18,336
5,615,968
223,464
2,702,142
9,296,386
3,815,944
105,981,832
2006-2007
CONTINUING
APPROPR.
349,302
0
1 ,799,345
2,515,418
23,123,305
3,907,140
344,262
0
2,056,112
31 ,236,207
0
4,550,020
0
0
219,100
2,769,097
28,012,884
4,270,438
1,227,013
292,678
1,181,774
13,196,454
10,286,739
100,000
2,841 ,839
90,262
964,021
2,224,135
0
2,759,024
936,662
9,461,338
150,714,569
2007-2008
NEW
APPROPR.
0
600,000
110,000
618,550
6,312,545
0
405,429
0
1,106,750
0
0
0
0
20,550
0
0
6,255,155
0
0
0
2,000,000
3,304,860
3,536,446
0
396,000
0
0
6,714,571
0
0
0
1,459,923
32,840,779
2007-2008
TOTALCIP
APPROPR.
349,302
600,000
1,909,345
3,133,968
29,435,850
3,907,140
749,691
0
3,162,862
31,236,207
0
4,550,020
0
20,550
219,100
2,769,097
34,268,039
4,270,438
1,227,013
292,678
3,181,774
16,501,314
13,823,185
100,000
3,237,839
90,262
964,021
8,938,706
0
2,759,024
936,662
10,921,261
183,555,348
1-15
2007-08 Capital Improvement Program 2007-08 Capital Improvement Program
PROJ.
ID
40001
35721
35722
36551
36851
40031
36881
39011
36861
40011
40012
37711
34553
34554
34557
39601
40021
40022
39261
36341
60151
36501
38961
39421
47001
38971
39431
38611
39361
39371
39722
45001
45002
38661
38022
Updated
Updated
PROJECT TITLE
CIVIC PROJECTS
ADMINISTRATIVE FACILITIES
CIVIC CENTER
CITY ADMIN TRAINING FACILITY (PRE-DESIGN) - PROP C
PUBLIC WORKS CENTER
PUBLIC WORKS CENTER
PUBLIC WORKS CENTER
POLICE & FIRE FACILITIES
POLICE CAD IMPLEMENTATION
FIRE STATION #3 RELOCATION
FIRE STATION #5 STORAGE BUILDING/RESTROOMS
FIRE STATION #6 (PERMANENT)
PUBLIC SAFETY TRAINING FACILITY - PROP C
LIBRARY FACILITIES
LIBRARY EXPANSION (COLE)
LIBRARY EXPANSION (COLE)
LIBRARY EXPANSION (LEARNING CENTER - ADVANCE)
LIBRARY EXPANSION (LEARNING CENTER - ADVANCE)
LIBRARY EXPANSION (LEARNING CENTER)
MISCELLANEOUS CITYWIDE PROJECTS
PROPOSITION C PROJECTS
COASTAL RAIL TRAIL (CMAO)
COASTAL RAIL TRAIL
COASTAL RAIL TRAIL
BICYCLE MASTER PLAN
PEDESTRIAN MASTER PLAN
PEDESTRIAN MASTER PLAN
CFD#1 ADMINISTRATION
OPPORTUNISTIC SAND
PUBLIC WORKS INVENTORY AND FAC MAINT PROGRAM
STREETSCAPE IMPROVEMENTS
VILLAGE PUBLIC PARKING ENHANCEMENT PROGRAM
SUBTOTAL CIVIC PROJECTS
FACILITIES MAINTENANCE
BEACH ACCESS STAIRS REPLACEMENT
COLE LIBRARY HVAC REPLACEMENT
REPAIR RECOATING GUARDRAIL PAR BRIDGE AT CARLSBAD BLVD
HOLIDAY PARK - RESTROOM IMPROVEMENTS
LAGUNA RIVIERA PARK HESTROOM REPLACEMENT
SENIOR CENTER COURTYARD LANDSCAPING
STAGECOACH PARK PICNIC SHELTER
STAGECOACH PARK SYNTHETIC TURF
SUBTOTAL FACILITIES MAINTENANCE
PARK PROJECTS
CJTYWLPE PARKS
BUSINESS PARK RECREATIONAL FACILITY
CARLSBAD MUNICIPAL GOLF COURSE
SENIOR CTR EXPANSION - 1ST FLOOR
SENIOR CTR EXPANSION - 2ND FLOOR
LAKE CALAVERA TRAILS MASTER PLAN/CONSTRUCTION
VETERAN'S MEMORIAL PARK
NORTHWEST QUADRANT PARKS
PINE AVENUE PARK - PHASE 1
PINE AVENUE PARK - PINE COMMUNITY BUILDING - PHASE II
PINE AVENUE PARK - PINE COMMUNITY BUILDING - PHASE II
FUND
CFDtf!
GCC
CFD#1
WATER REPL
SEWER REPL
GCC
PFF
GCC
PFF
GCC
CFD#1
PFF
GCC
CFDffl
OTHER
GCC
FED GRNT
TRANSNET/BIKE
OTHER
TRANSNET/BIKE
TDA
GCC
CFD*1
OTHER
GCC
REDVL VILLAGE
REDVL VILLAGE
IRF
IRF
GCC
IRF
IRF
GCC
GCC
GCC
ZONES
GOLF COURSE
REDVL VILLAGE
GCC
GCC
CFD#1
PFF
PIL-NW
PFF
TOTAL
BUDGET
26,063,010
100,000
16,594,319
6,927,118
3.730,640
2,312,228
6,801 ,600
316,600
5,830,000
950,000
4,580.016
9,832,400
600,000
4,491,837
1,048,163
17,734,205
4,413,784
221,800
184,176
150,000
100,000
150,000
1,004,032
57,240
404,992
400,000
850,000
115,848,160
517,500
1,319,790
130,000
530,808
260,000
30,000
100,000
1,718,000
4,606,098
3,015.753
55,441,655
1 ,082.044
529,162
598,750
22,453,930
7,082,000
1,724,039
7,625,178
PRIOR
EXP/ENC
-
1,156,248
-
-
1,848,135
314,241
1,366,921
171,284
-
164,522
4,338,897
1,048,163
4,069,522
220,806
180,370
60,732
-
-
29,645
57,240
322.562
-
-
15,349,288
78,956
1,226,736
-
473,711
166,288
21,206
4.537
1,674,216
3,645,650
51,534,515
55,031
20,950
50,904
-
6.958,589
-
-
BALANCE YEAR 1 YEAR 2 YEAR 3 YEAR 4 YEAR 5 YEAR 6-10 BUILDOUT
FORWARD 2007-2008 2008-2009 2009-2010 2010-2011 2011-2012 2012-2017 2017-2022
1 ,552,01
-
-
464,093
1 ,000,000
2,359
4,463,079
778,716
435,478
152,940
-
344,262
994
3,806
89,268
100,000
150,000
94,387
82,430
100,000
9,813,830
438,544
93.054
130.000
57,097
93.712
8,794
95,463
43,784
960,448
3,907,140
1,027,013
508,212
547,846
•
123.411
-
26,063,010
100,000
13,886,053
6.927,118
3,730.640
476,560 5,221 ,440 1 03,600
4,580,016
9,832,400
17,734,205
1 1 0,000 1 10.000 1 1 0,000 1 1 0,000 1 1 0,000 330,000
300,000
850,000
110,000 986,560 29,875,251 213,600 26.173,010 18,914,205 14,412,416
-
3,015,753
11,226,503 11,227,427
1 ,724,039
584,091 7,041,087
J-1 J-2
2007-08 Capital Improvement Program 2007-08 Capital Improvement Program
PROJ.
ID
38561
36981
38011
36991
Updated
Updated
36491
45021
45021
38372
39251
39251
39252
45011
39612
39611
333B1
36241
66051
36363
36363
36225
66001
66061
38721
36811
Updated
66031
66041
66011
66021
58001
58011
58031
55061
36224
PROJECT TITLE
NORTHEAST gUADRANT PARKS
HIDDEN CANYON PARK (22.3 ACRES)
PARK SITE ACQUISITION (15 ACHES) NE QUADRANT PARK
PARK SITE DEVELOPMENT (15 ACRES)
SOUTHWEST QUADRANT PARKS
AVIARA COMMUNITY PARK (24.25 ACRES) *
AVIARA COMMUNITY PARK COMMUNITY BUILDING
AVIARA COMMUNITY PARK COMMUNITY BUILDING
AVIARA REIMBURSEMENT AGREEMENT
POINSETTIA COMMUNITY PARK - TENNIS COURTS & COMMUNITY CENTER
POINSETTIA COMMUNITY PARK - PARKING
SOUTHEAST QUADRANT PARKS
ALGA NORTE PARK - PHASE 1 (30 ACRES)
ALGA NORTE PARK - PHASE II (POOL)
ALGA NORTE PARK - PHASE II (POOL)
ALGA NORTE PARK - PHASE II (POOL) PROP C FUNDS
LEO CARRILLO PARK - PHASE III
LEO CARRILLO PARK - PHASE III
LEO CARRILLO PARK - EROSION CONTROL
CARRILLO BARN RESTORATION
LEO CARRILLO - HISTORIC BARN (50% GRANT)
LEO CARRILLO EVENT AREA EXPANSION
SUBTOTAL PARK PROJECTS
DRAINAGE PROJECTS
AQUA HEDIONDA CHANNEL (PLDA "B")
CARLSBAD BLVD STORM DRAtN REPLACEMENT
CALLE GAVANZO DRAINAGE
COLLEGE BLVD/CANNON RD (BJ AND CALAVERA CR. CHANNEL)
COLLEGE BLVD/CANNON RD (BASIN BJB - REIMB./PLDA 'B') (FEMA + PLD)
COLLEGE BLVD. BRIDGE FACILITY BL (REIMB./PLDA °B")
FARADAY/MELROSE DRAINAGE FACILITIES (PLDA "B")
HIGHLAND DRIVE - BETWEEN PINE & BASSWOOD
KELLY DRIVE CHANNEL REPAIR
MASTER PLAN UPDATE
MISCELLANEOUS MASTER DRAINAGE FACILITIES
MISCELLANEOUS ROAD SUBDRAINS
PARK DRIVE AND TAMARACK AVENUE STORM DRAIN (PLDA 'B')
RIDGECREST DRAINAGE IMPROVEMENTS
ROMERIA DRAINAGE IMPROVEMENTS
TAMARACK AND ECR STORM DRAIN AND SILT. BASIN (REIMB./PLDA "B")
CYNTHIA LANE STORM DRAIN
LA COSTA AVE STORM DRAIN REPLACEMENT
CMP REPLACEMENT PROGRAM
NW QUADRANT STORM DRAIN IMPROVEMENT PROGRAM
SUBTOTAL DRAINAGE PROJECTS
SEWER PROJECTS
ENCINA WATER POLLUTION CONTROL FACILITY
BUILDING IMPROVEMENTS
CAPITAL ACQ/REPL/REHAB AND STAFFING
PHASE IV EXPANSION - DEBT SERVICE
PHASE V EXPANSION
SEWER COLLECTION SYSTEM
BUENA VISTA LAGOON SEWAGE SPILL
AVENIDA ENCINAS GRAVITY SEWER
BUENA VISTA LIFT STATION FORCE MAIN
CARLSBAD TRUNK SEWER REACHES VCT1A, VCT1B, VCT1C (SBA "A')
FARADAY AVENUE - ORION TO MELROSE SEWER
FUND
PIL-NE
PIL-NE
PIL-NE
PFF
PFF
PIL-SW
PIL-SW
PFF
PFF
PFF
PFF
GCC
GCC
PFF
PIL-SE
GCC
PFF
GCC
PIL-SE
PLD
IRF
GCC
PLD
PLD
PLD
PLD
GCC
IRF
PLD
PLD
GAS TAX
PLD
GCC
GCC
PLD
IRF
IRF
IRF
GCC
SEWER REPL
SEWER REPL
SEWER CONN
SEWER CONN
SEWER REPL
SEWER REPL
SEWER CONN
SEW BENEF
SEWER REPL
TOTAL
BUDGET
1,886,766
4,550,000
4,000,000
10.700,000
7,374,076
2,607,483
238,000
13,660,238
963,400
22,107,510
6,099,695
6,000,000
16,215,795
1 ,987,400
836.800
267,000
33,000
500,000
267,000
199,846,673
1 ,680,522
218,000
62,500
2,778,833
830,910
1,847,188
300,000
196.101
1,112,000
454,933
10,936,000
485,000
610,000
117,500
274,000
1 ,279,000
253,750
492,150
2,230,000
3,295,355
29,453,742
4,303,491
14,812,710
8.391,591
9,968,541
750,000
266,963
1,491,978
540,965
110,200
PRIOR
EXP/ENC
1 ,886,264
482
10,699,654
-
-
18,900
109,214
-
1,407,170
500,000
-
389,265
-
-
249,962
32,970
58,360
-
73,972,230
1,606,681
350
10,500
426.495
738,168
-
-
22,975
138,140
454,757
-
438
20,330
12,700
-
5,280
-
3.486,814
3,306,358
744,444
933,944
1,076,926
315,444
-
-
50,425
BALANCE YEAR 1 YEAR 2 YEARS YEAR 4 YEARS YEAR 6-10 BUILDOUT
FORWARD 2007-2008 2008-2009 2009-2010 2010-2011 2011-2012 2012-2017 2017-2022
502
4,549,518
-
346
-
219,100
979,986
-
14,505,400
5,599,695
6,000,000
10,849,735
-
-
1 7,038
30
441,640
-
49,276,612
73,841
79,650
52,000
2,352,338
42,742
300,000
173,126
61 ,860
176
484,562
-
97,170
261,300
94,720
492,150
-
4,565,635
997,133
750,170
-
7,244,262
434,556
59,775
4,000,000
7,374,076
2,607,483
914,606 11,656,432
60,215 903,185
6,194,940
4,976,795
1,987,400
836,800
20,550 246,450
11,252,500 1,149,635 584,091 9,679,731 11,656,432 11,226,503 31,048,939
138,000
1,847,188
240,000 632,000 40,000
10.936,000
610,000
1,279,000
153.750
575,000 620,000 365,000 460,000 210,000
305,250 407,000 384,825 408,650 684,230 1,105,400
1,412,000 1,659.000 789,825 868,650 894,230 3,562,588 12,215,000
696,031 878,849 1,273,982 890,709 870,775 4,353,875 4,353,875
935,507 937,169 933,006 931,418 932,468 2,788,079
1 ,647,353
266,963
1,491,978
103,600 437,365
J-3 J-4
PROJ.
ID
34951
38731
39511
55001
38741
35371
35381
38091
38751
38401
39271/55031
39521/55041
3828/3583
34921
38861
39491
38671
39501
55021
55011
2007-08 Capital Improvement Program
PROJECT TITLE FUND
FOREST GRAVITY SEWER
HOME PLANT - PIPELINE REPLACEMENT
HOME PLANT LIFT STATION REHABILITATION
LA COSTA MEADOWS SEWER EXTENSION
LAGOLONDRIA SEWER EXTENSION
NORTH AGUA HEDIONDA INTERCEPTOR REHAB - EAST SEGMENT
NORTH AGUA HEDIONDA INTERCEPTOR - WEST SEGMENT
NORTH AGUA HEDIONDA TRUNK SEWER REACH NAHT1A
NORTH BATIQUITOS INTERCEPTOR REHABILITATION
NORTH BATIQUITOS SEWAGE LIFT STATION MODIFICATIONS
POINSETTIA SEWAGE LIFT STATION ODOR/NOISE ABATEMENT
SEWER LIFT STATION REMOVALS - GATESHEAD, VILLAS, SIMSBURY, VANCOUVER
SEWER LIFT STATION REPAIRS AND UPGRADES
SEWER LINE REFURBISHMENTS/REPLACEMENT
SEWER MASTER PLAN/CONNECTION FEE UPDATE
SEWER MONITORING PROGRAM
SOUTH AGUA HEDIONDA LIFT STATION AND FORCE MAIN
VISTA/CARLSBAD INTERCEPTOR AGUA HEDIONDA LIFT STATION (VC12)
VISTA/CARLSBAD INTERCEPTOR REACH VC11B
VISTA/CARLSBAD INTERCEPTOR REACH VC1 3 TO VC15
VISTA/CARLSBAD INTERCEPTOR REHAB REACHES 1 AND 2
VISTA/CARLSBAD INTERCEPTOR REPLACEMENT REACH 3
TERRAMAR LIFT STATION EMERGENCY GENERATOR
BUENA INTERCEPTOR SEWER IMPROVEMENTS
DEMO CALAVERA HILLS TREATMENT PLANT
SUBTOTAL SEWER PROJECTS
SEWER REPL
SEWER REPL
SEWER REPL
SEWER REPL
SEWER REPL
SEWER REPL
SEWER REPL
SEWER REPL
SEWER REPL
SEWER REPL
SEWER REPL
SEWER REPL
SEWER REPL
SEWER REPL
SEWER REPL
SEWER CONN
SEW BENEF
SEWER CONN
SEWER CONN
SEWER CONN
SEWER REPL
SEWER CONN
SEWER REPL
SEWER REPL
SEWER REPL
TOTAL
BUDGET
900.000
440,000
650,000
1 .039,520
1,001,395
319,244
4,177,751
1,863,156
1,199,000
647.193
545,000
400,000
1 ,360,380
5,974,600
354.200
352,000
8.827,415
9,127,159
3,549,000
13.515,200
830,975
2,688,220
205,958
2.340,000
394,000
103,337,805
PRIOR
EXP/ENC
793,250
2,230
-
72,532
106,547
319,244
1,047,781
128,694
638,607
69.400
466,283
172,957
-
-
7,645,641
90,270
5,649
464.249
262,279
-
-
123.634
-
18.836,788
2007-08 Capital Improvement Program
33762
33761
39541
38421
50001
50011
39551
34461
50031
50021
38431
39111
39121
38161
3913!
36223
39031
38211
50042
50041
50051
WATER DISTRIBUTION SYSTEM
"D" RESERVOIR - PHASE II WATER CONN 6,193,311
•D- RESERVOIR - PHASE II
'D" RESERVOIR - BLACKRAIL ROAD IMPROVEMENTS
AVIARA PARKWAY AT PLUM TREE
CALAVERA HILLS WATER BOOSTER STATION STANDBY GENERATOR
CANNON ROAD EAST OF EL CAMINO REAL - Reimb
CARLSBAD BOULEVARD - SOUTH OF AVENIDA ENCINAS
COLLEGE BOULEVARD - CANNON TO BADGER LANE
COLLEGE BOULEVARD (ECR TO CANNON ROAD) - Reimb
COLLEGE BOULEVARD- MAERKLE RESERVOIR TO AGUA HEDIONDA CREEK
CRESTVIEW DRIVE TRANSMISSION MAIN
DEMOLITION OF WATER FACILITIES AT PAJAMA DRIVE
DESALINATION GROUNDWATER/SEAWATER STUDY
EL CAMINO REAL - PALOMAR AIRPORT ROAD SOUTH
EL CAMINO REAL BETWEEN COLLEGE AND JACKSPAR
EL CAMINO REAL CROSSING AT KELLY DRIVE
EL CAMINO REAL TRANSMISSION MAIN FROM FARADAY TO COUGAR DRIVE
EL CAMINO REAL/CARLSBAD VILL DR PIPELINE REPL.
EL FUERTE - NORTH OF LOKER - Reimb
EL FUERTE - ALGA ROAD TO POINSETTIA LANE - Reimb
EL FUERTE - POINSETT1A LANE TO PALOMAR AIRPORT ROAD - Reimb
EL FUERTE AND CORINTIA STREET
FARADAY AVENUE - ORION TO MELROSE WATERLINE - Reimb
FARADAY AVENUE EXTENSION - Reimb
FOUSSAT ROAD WELL ABANDONMENT
LAKE CALAVERA RESERVOIR IMPROVEMENTS
MAERKLE PUMP STATION IMPROVEMENTS
MAERKLE PUMP STATION IMPROVEMENTS
MAERKLE RESERVOIR STORAGE (TAP #2)
MAERKLE DAM FLOATING COVER DRAINPIPE REPLACE.
MARHON ROAD - PRESSURE REGULATING STATION TO OCEANSIDE
MASTER PLAN UPDATE
MELROSE DRIVE - PALOMAR AIRPORT ROAD TO FARADAY - Reimb
WATER REPL
WATER REPL
WATER REPL
WATER CONN
WATER CONN
WATER REPL
WATER CONN
WATER CONN
WATER REPL
WATER REPL
WATER REPL
WATER REPL
WATER REPL
WATER CONN
WATER CONN
WATER REPL
WATER REPL
WATER CONN
WATER CONN
WATER CONN
WATER REPL
WATER CONN
WATER CONN
WATER REPL
WATER REPL
WATER CONN
WATER REPL
WATER CONN
WATER REPL
WATER CONN
WATER CONN
WATER CONN
2,064,365
367,000
459,612
468,817
760,800
886.171
746,949
487,436
3.758,520
150,519
95,500
719,260
3,225,000
971,275
725,000
774,100
269,975
148.750
2,000,000
1,141,000
156,272
97,210
749,773
202,500
6,646,908
747,100
747.100
13,762,757
200,000
741,221
47,800
796,300
-
366,715
-
-
-
-
-
-
-
506
-
2,340,294
871,986
639,225
168,902
238,978
-
1,125,996
632,362
-
1 1 ,739
-
192,782
1.106,541
-
39,763
-
7,748
-
-
-
J-S
BALANCE YEAR 1 YEAR 2 YEAR 3 YEAR 4
FORWARD 2007-2008 2008-2009 2009-2010 2010-2011
106.750
437,770
-
137,468
547.453
-
3.129,970
-
1,070,306
8,586
475,600
-
114,097
1 ,087,043
-
44,000
1,181,774
1,029,090
3,543,351
1,335.751
568,696
25,000
336,366
24,664.967
285
-
760,800
-
-
-
495,000
59,494
884,706
99,289
85,775
605,198
30,997
148,750
874.004
508,638
-
85,471
9.718
4,990,694
54,425
14,662
-
192,252
-
-
-
YEARS YEAR 6-10 BUILDOUT
2011-2012 2012-2017 2017-2022
650,000
829,520
347,395
119,474 1,743,682
400,000
80,000 100,000 100,000
1,140,000 330,000 330,000 330,000
100,000 400,000
330.0OO 1 ,650,000 604,600
354,200
22,000 22,000 22,000 22,000 22,000 110,000 88,000
700,000 7,307,799
11,715,200
73,220 523,000 2,092,000
180,958
500,000 1,380.000
23,500 57,000 313.500
6,841,306 24,398,632 5,239,170 4,366,127 2,713,043 9,739,319 6,538,453
6,193,311
2,064,365
459,612
52,300 416.517
886,171
746,949
487.436
376,560 2,886,960
31,380 119.139
35,500
719,260
156,272
749,773
549.673
692,675
692,675
13,762,757
741,221
47,800
796,300
J-6
2007-08 Capital Improvement Program 2007-08 Capital Improvement Program
PROJ.
ID
39041
38221
35311
39102
39101
38581
39231
39561
39151
39001
36641
— ••
52001
34871
36753
38881
38901
38871
38891
PROJECT TITLE
MISCELLANEOUS PIPELINE REPLACEMENT PROJECTS
MISCELLANEOUS WATER RESERVOIR FENCING
OCEANSIDE INTERTIE UPGRADE
PAR/ECR PUMP STATION
PAR/ECR PUMP STATION
POINSETTIA LANE - EL CAMINO REAL TO SKIMMER CT (Reimfa)
POINSETTIA LANE - SKIMMER CT TO CASSIA
POINSETTIA LANE - SKIMMER CT TO CASSIA
POINSETTIA LANE EAST OF BLACK RAIL ROAD 12"
POINSETTIA LANE EAST OF BLACK RAIL ROAD 12"
PRESSURE REDUCING STATION • SYCAMORE CREEK
RANCHO CARRILLO OVERSIZING/EXTENSION
RANCHO SANTA FE RD PIPELINE REPLACEMENT
SAN MARCOS BOULEVARD WEST OF SDCWA
TANGLEWOOD PRESSURE REDUCING STATION REPLACEMENT
ELLERY WATER PUMP PROJECT
WATER SYSTEM INTERTIE CONNECTION
MAERKLE RESERVIOUR BRIDGE REPLACEMENT
CATHODIC PROTECTION PROGRAM
SUBTOTAL WATER DISTRIBUTION SYSTEM
RECYCLED WATER PROJECTS
CHESTNUT AVENUE RECYCLED WATER LINE
ECR/TAMARACK PUMP STATION REMOVAL
I-5 RECYCLED WATER TRANSMISSION LINE
PUMP STATION REMOVAL
RECYCLED WATER PH II - FACILITY
RECYCLED WATER PH H - FLOW EQUALIZATION
RECYCLED WATER PH II - MAHR RESERVOIR IMPROV.
RECYCLED WATER PH II - PIPELINES
RECYCLED WATER PH il - PUMP STATIONS
SUBTOTAL RECYCLED WATER PROJECTS
FUND
WATER REPL
WATER REPL
WATER REPL
WATER CONN
WATER REPL
WATER CONN
WATER REPL
WATER CONN
WATER CONN
WATER REPL
WATER CONN
WATER CONN
WATER REPL
WATER REPL
WATER REPL
WATER REPL
WATER REPL
WATER REPL
WATER REPL
WATER REPL
WATER REPL
WATER REPL
WATER REPL
RECL WATER
HECL WATER
RECL WATER
RECL WATER
RECL WATER
TOTAL
BUDGET
1 .847,051
197,399
110,700
997,350
990,350
121.478
472,583
370,610
222,691
222,583
121,478
93,700
773,000
3,091 ,241
354,750
205,900
439,000
201 .250
1,246,700
63,388,114
436,100
80,019
266.610
442,700
12,130,019
4,127,402
2,957,000
21,852,521
4,918,574
47,210,945
PRIOR
EXP/ENC
218,327
32,802
-
893,803
965,81 1
-
-
-
-
55,375
662,807
2,990,845
321,560
387
34,774
-
-
13,920,028
-
-
.
-
12,083,897
4,127,402
2,948,528
21.086,213
4,802,814
45.048,854
CIRCULATION SYSTEM
TRAFFIC SIGNAL PROJECTS
33692
33693
63001
39021
63011
39171
38991
63021
63031
NEW
63041
36211
39381
TRAF SIG - ALGA ROAD AND CAZADERO
TRAF SIG - AVIARA PARKWAY- POINSETTIA LANE TO EL CAMINO REAL
TRAF SIG - AVIARA PARKWAY- POINSETTIA LANE TO EL CAMINO REAL
TRAF SIG - AVIARA PKWY AND CAMINO DE LAS ONDAS- REIMS
TRAF SIG - CALLE BARCELONA AND PASEO AVELLANO
TRAF SIG - CAMINO DE LOS COCHES AND LA COSTA AVENUE
TRAF SIG - CAMINO VIDA ROBLE AND YARROW DRIVE
TRAF SIG - CANNON ROAD AND AVENIDA ENCINAS-reim.
TRAF SIG - CANNON ROAD AND COLLEGE BOULEVARD
TRAF SIG • CARLSBAD BLVD & TAMARACK SIGNAL REPAIRS
TRAF SIG - CARLSBAD VILLAGE DRIVE AND GLASGOW DR
TRAF SIG - COLLEGE BOULEVARD AND CARLSBAD VILLAGE DR - REIMB
TRAF SIG - EL CAM REAL/PLA2A/MARRON/HOSP WY
TRAF SfG - EL CAMINO REAL AND CHESTNUT SIGNAL REPAIRS
TRAF SIG - EL CAMINO REAL AND TAMARACK SIGNAL REPAIRS
TRAF SIG - EL FUERTE ST AND RANCHO PANCHO
TRAF SIG - FARADAY AVE. AND CAMINO HILLS DRIVE
TRAF SIG - FARADAY AVENUE AND ORION STREET
TRAF SIG - FARADAY AVENUE AND PRIESTLY DRIVE
TRAF SIG - FARADAY AVENUE AND RUTHERFORD ROAD
TRAF SIG - LA COSTA AVENUE AND ESFERA STREET
TRAF SIG - LA COSTA AVENUE AND LEVANTE
TRAF SIG - LA COSTA AVENUE/NUEVA CASTILLA
TRAF SIG - MELROSE DRIVE AND LA COSTA AVENUE
TRAF SIG - MONROE STREET AND HOSP WAY
GAS TAX
OTHER
GCC
GCC
GCC
GAS TAX
GAS TAX
PFF
GAS TAX
IRF
GCC
GAS TAX
TRANSNET-LOC
IRF
IRF
GCC
GCC
TIF
GAS TAX
GCC
GAS TAX
GCC
GCC
GAS TAX
GCC
210,000
862,649
260,000
105,000
210.000
190,000
190,000
150.000
210,000
230,000
210.000
210,000
1,311,000
206,000
141,000
190,000
190,000
289.550
303,050
190,000
190,000
210,000
190,000
190,000
210,000
-
335,447
.
-
-
-
-
-
-
187,050
-
1.210,497
-
.
.
-
289,420
302.978
-
-
.
-
.
-
BALANCE YEAR 1 YEAR2 YEARS YEAR 4 YEARS YEAR6-10
FORWARD 2007-2008 2008-2009 2009-2010 2010-2011 2011-2012 2012-2017
781 ,673
87,597
-
103,547
24,539
-
-
-
-
-
38,325
110,193
100,396
33,190
60.513
404,226
-
-
11,644,357
-
-
1 33,305
442,700
46,122
-
8,472
766,308
115,760
1,512,667
267,202
160,000
105,000
-
-
-
150,000
230,000
22,950
100,503
206,000
141,000
-
-
130
72
-
-
210,000
-
-
BUILDOUT
2017-2022
418,400 428,651
77,000
110,700
121,478
472,583
370,610
222,691
222,563
121,478
145,000
28,750 172,500
624.000 475,800 146.900
1,459,923 3,524,569 3,625,511 16,459,658 119,139 11,893,709 741,221
436,100
80,019
133,305
436,1 00 80,01 9 1 33,305
210,000
260,000
100.000
210,000
190,000
190,000
210,000
210,000
190,000
190,000
190,000
190,000
190.000
190,000
210,000
J-7 J-8
PROJ.
ID
36441
39391
39461
34061
39401
63051
60041
39221
31842
38141
38141
39471
60141
60161
60001
39191
38541
35571
36362
38791
60061
NEW
36071
36431
36431
39091
39201
39291
39571
Updated
60091
60081
60071
60072
60101
60121
60122
60111
38111
60011
2007-08 Capital Improvement
PROJECT TITLE
TRAP SIG - PALOMAR AIRPORT ROAD AND MELROSE DRIVE
TRAP SIG - POINSETTIA LANE AND BLACKRAIL ROAD
TRAP SIG - POINSETTIA LANE AND BRIGANTINE ROAD
TRAP SIG - POINSETTIA LANE AND EL FUERTE STREET (REIMS)
TRAP SIG - RANCHO SANTA FE ROAD AND CALLE JUNIPERO
TRAF SIG - RANCHO SANTA PE ROAD AND QUESTHAVEN ROAD
TRAF SIG - RANCHO SANTA FE ROAD AND AVENIDA LA CIMA
TRAF SIG - TAMARACK AVE AND PONTIAC DRIVE
TRAF SIG - TAMARACK AVE. AND VALLEY STREET
CLARY BATTERY BACKUP SYSTEMS/RED LED REPLACEMENTS
VIDEO DETECTION CONVERSION
SUBTOTAL TRAFFIC SIGNAL PROJECTS
STREET PROJECTS
AVENIDA ENCINAS WIDENING - SOUTH OF PALOMAR AIRPORT ROAD
BTD#2/POINSETT1A LANE - REACH E (PARTIAL FUNDING)
BTD#2/POINSETTlA LANE - REACHES A,B,C,F,G & AVIARA PKWY REIMB
BTD#3 CANNON ROAD - FROST TO FARADAY (REIMB.)
BRIDGE PREVENTITIVE MAINTENANCE PLAN
CANNON ROAD REACH 4B
CARLSBAD BLVD. AT BREAKWATER ROAD - LEFT TURN LANE
CARLSBAD BLVD BRIDGE CONCRETE BARRIER POWER PLANT
CARLSBAD BLVD BRIDGE CONCRETE BARRIER RAILROAD
CARLSBAD BLVD. AT STATE ST - INTERSECTION ENHANCEMENT DESIGN
CARLSBAD BOULEVARD ENCINAS CREEK BRIDGE REPLACEMENT
CARLSBAD BOULEVARD ENCINAS CREEK BRIDGE REPLACEMENT
CARLSBAD BOULEVARD ENCINAS CREEK BRIDGE REPLACEMENT
CARLSBAD BOULEVARD MEDIAN-TAMARACK AVENUE TO PINE AVENUE
CARLSBAD BOULEVARD PEDESTRIAN ACCESS STUDY
CARLSBAD BOULEVARD RETROFIT OVER SDNR
CARLSBAD BOULEVARD WIDENING - CANNON TO MANZANO
CARLSBAD VILLAGE DRIVE WIDENING
COLLEGE BLVD REACH A AND CANNON REACH 4A
COLLEGE/CANNON ASSESSMENT DISTRICT
CONCRETE REPLACEMENT
CVD AND AVENIDA DE ANITA
EL CAMINO REAL AND CARLSBAD VILLAGE DRIVE
EL CAMINO REAL AND FARADAY AVENUE
EL CAMINO REAL AT AVIARA PARKWAY/ALGA ROAD
EL CAMINO REAL MEDIANS
EL CAMINO REAL MEDIANS
EL CAMINO REAL MEDIANS - LA COSTA
EL CAMINO REAL WIDENING - LA COSTA AVENUE TO ARENAL ROAD
EL CAMINO REAL WIDENING - LISA STREET TO CRESTVIEW DR (LOAN)
EL CAMINO REAL WIDENING - NORTH OF COUGAR DRIVE (LOAN)
EL CAMINO REAL WIDENING - S. CHESTNUT & S. ALGA
EL CAMINO REAL WIDENING - TAMARACK AVENUE TO CHESTNUT AVE.
EL CAMINO REAL WIDENING - TAMARACK AVENUE TO CHESTNUT AVE.
EL FUERTE EXTENSION
FARADAY AVENUE EXTENSION
I-5 AND LA COSTA AVENUE AUXILLARY LANES
MELROSE DRIVE AND ALGA ROAD
MELROSE DRIVE EXTENSION
MELROSE DRIVE EXTENSION
MELROSE DRIVE - SOUTH OF PALOMAR AIRPORT ROAD
PALOMAR AIRPORT ROAD AND MELROSE DRIVE RIGHT TURN
PALOMAR AIRPORT ROAD AND MELROSE DRIVE RIGHT TURN
PALOMAR AIRPORT ROAD AND COLLEGE BOULEVARD
PALOMAR AIRPORT ROAD WIDENING AT MELROSE DRIVE
PALOMAR AIRPORT ROAD WIDENING AT PASEO DEL NORTE
PARK DRIVE, MARINA TO COVE
PAVEMENT MANAGEMENT PROGRAM
Program
FUND
PFF
GCC
GCC
PFF
GAS TAX
GCC
GCC
GCC
GCC
GAS TAX
GAS TAX
TIP
BTD#2
BTD#2
BTD83
FED GRNT
TRANSNET-HWY
REDVL SCCRDA
GCC
GCC
REDVL VILLAGE
REDVL SCCRDA
FED GRNT
TRANSNET-LOC
GAS TAX
GCC
TRANSNET-LOC
TIF
TIP
OTHER
OTHER
IRF
GCC
TIF
TIF
TIF
PFF
GAS TAX
PFF
TIF
TRANSNET-LOC
TRANSNET-LOC
TIF
TIF
TRANSNET-LOC
OTHER
OTHER
CFD#I
TIF
OTHER
OTHER
OTHER
OTHER
GAS TAX
TIF
OTHER
TIF
GCC
TRANSNET-LOC
TOTAL
BUDGET
250,000
210,000
190,000
210,000
210,000
124,767
190,000
210,000
190,000
201,550
1 ,850,000
10,684.566
983,000
11,050,000
1,320,729
6.194,747
100,000
1,761,000
243,150
1 ,300,000
277,000
100,000
339,135
2,161,260
279,640
2,041,080
105,000
1,519,000
2,449,063
1 ,542,042
1,713,002
10,314,481
1 .243,350
105,000
346,770
1.235,941
305,591
909,500
1.452,058
90,500
550,497
959,000
493,000
522,115
1,382,708
3,300.000
4,095,146
16,248,065
2,000,000
587,342
1 ,525,584
3,477,792
228,938
230,980
65,000
173,385
2,826,268
525,000
145,627
62,699,648
PRIOR
EXP/ENC
125,033
3,938
-
-
-
-
3,954
-
202,800
2,661,117
198,526
698
-
5,194,747
-
796,979
243,000
12,000
12,000
-
46,607
297,682
38,568
-
99,591
1 ,506,725
-
-
394,042
10,006,735
1,175,025
-
1,235,771
-
144,030
•
-
-
-
202,126
854,896
39.723
896.088
-
14,798
2,833,564
2,221
980
-
2.523,209
42,308
-
18,898,865
2007-08 Capital Improvement Program
BALANCE YEAR 1 YEAR 2 YEAR 3 YEAR 4 YEAR 5 YEAR 6-10 BUILDOUT
FORWARD 2007-2008 2008-2009 2009-2010 2010-2011 2011-2012 2012-2017 2017-2022
124,967
206,062
.
210,000
.
124,767
206,046
„
.
314,200
2,778,899
26,474
349,302
,
964,021
150
268,000
8,000
100,000
292,528
.
.
.
5.409
12,275
.
.
1.318,960
307,746
68.325
.
.
170
.
765,470
,
90,500
.
-
290,874
522,115
527,812
.
4,055,423
15,351,977
1,510,786
644,228
226,717
230,000
65,000
303,059
482,692
-
1,820,483
190,000
210,000
190,000
190,000
201 ,550
67,000 277,000 247,000 307,000 300,000 135,000
668,550 277,000 437,000 667,000 300,000 2,515,000 380,000
758,000
1,600,000 9,100,000
1,320,729
600,000 400,000
100,000
140,000 880,000
257,000
305,429 1,558,149
39,571 201.501
2,041,080
2,449,063
1 ,542,042
105,000
346,770
305,591
1,452,058
550,497
959,000
3,300,000
2,000.000
587,342
173,385
145,627
2,600,000 2.650,000 2,848,000 4,732,800 2,838,000 14,065,000 12,246,500
J-9 J-10
2007-08 Capital Improvement Program 2007-08 Capital Improvement Program
PROJ.
ID
60012
60011
60131
36892
38601
31906
39071
38801
60051
60021
60031
NEW
NEW
NEW
38951
PROJECT TITLE
PAVEMENT MANAGEMENT PROGRAM
PAVEMENT MANAGEMENT PROGRAM (NON-JUR1S FEES)
CONCRETE REPAIR WORK
POINSETTIA LANE EAST OF EL CAMINO REAL FINANCING PROGRAM
POINSETTIA LANE WIDENING (PASEO DEL NORTE TO BATIQUITOS LN)
RANCHO SANTA FE ROAD AND OLIVENHAIN IMPROVEMENTS
RANCHO SANTA FE ROAD NORTH - PHASE 1
RANCHO SANTA FE ROAD NORTH - PHASE II (BRIDGE)
RANCHO SANTA FE ROAD SOUTH
SAN MARCOS ROAD PROJECT
SIDEWALK/STREET CONSTRUCTION PROGRAM
TRAFFIC MONITORING PROGRAM
TAMARACK AND ADAMS
VALLEY AND MAGNOLIA SIDEWALKS
VALLEY AND MAG NOLI A SIDEWALKS
UNDERGROUND DIST. 17 - HARDING, ROOSEVELT
MARBELLA WALL BEAUTIFICATION
SUBTOTAL STREETS PROJECTS
LOANS TO OTHER FUNDS
GAS TAX LOAN BTD#2
GAS TAX LOAN TO BTDtfS CANNON ROAD WEST
GCC LOAN TO PFF - ALGA NORTE POOL
GCC LOAN TO PFF - FIRE STATION #3 LAND ACQUISITION
GCC LOAN TO PFF - POINSETTIA TENNIS COURTS
GCC LOAN TO PIL-NW FOR MADISON ST PROPERTY PURCHASES
GCC LOAN TO PIL-NW FOR PINE SCHOOL ACQUISITION
PFF LOAN TO PIL-NE FOR PARK SITE ACQUISITION
GCC LOAN TO PLDA - HEDIONDA AND CALAVERA CREEK
SEWER REPL TO SEW BENEF A FOR CARLSBAD TRUNK SEWER
SUBTOTAL FUTURE LOANS TO OTHER FUNDS
LOAN REPAYMENTS
BTDff2 REPAYMENT TO GAS TAX FUND
BTD#3 CANNON ROAD WEST TO GAS TAX FUND
GCC LOAN TO PFF - ALGA NORTE POOL
GCC LOAN TO PFF - FIRE STATION #3 LAND ACQUISITION
GCC LOAN TO PFF - POINSETTIA TENNIS COURTS
GCC LOAN TO PLDA - HEDIONDA AND CALAVERA CREEK
PIL-NW TO GCC FOR MADISON ST PROPERTY PURCHASES
PIL-NW TO GCC FOR PINE SCHOOL ACQUISITION
PIL-NE TO PFF FOR PARK ACQUISITION
SBA C.D.E.F TO SEW REPL FOR S AGUA HEDIONDA INTERCEPTOR
SUBTOTAL LOAN REPAYMENTS
GRAND TOTAL ALL FUNDED PROJECTS
UNFUNDED PROJECTS*
PALOMAR AIRPORT ROAD WIDENING AND BRIDGE RECONSTRUCTION
CANNON LAKE PARK (6.7 ACRES)
HOSP GROVE/BUENA VISTA LAGOON REC'L IMPROVEMENTS
EL CAMINO REAL WIDENING - CASSIA RD TO CAMINO VIDA ROBLE
POINSETTIA LANE - REACH "E" ($1 1M funded through BTD #2)
CANNON ROAD - REACH 4B - COLLEGE/CANNON TO CITY LIMITS
PINE AVENUE PARK - MADISION PROPERTY
PINE AVENUE PARK - REST ROOM/STORAGE BLDG.
TOTAL UNFUNDED PROJECTS
FUND
GAS TAX
TRANSNET-LOC
GAS TAX
OTHER
TIF
RSF ROAD
RSF ROAD
RSF ROAD
RSF ROAD
GCC
TIF
TIF
GCC
TIF
TRANSNET-LOC
GCC
GCC
GAS TAX
GAS TAX
GCC
GCC
GCC
GCC
GCC
PFF
GCC
SEWER REPL
BTD#2
BTD#3
PFF
PFF
PFF
PLD
PIL-NW
PIL-NW
PIL-NE
SEW BENEF
TOTAL
BUDGET
9,464,086
13.151,217
4,150,000
28,932,793
2,289,765
3,800,000
26,406,243
18,641,000
1 ,985,399
2,734,147
3,270,672
1,618,744
48,500
315.000
315,000
509.800
80,000
271,230,499
2,643,344
1 ,000,000
2,500,000
1 ,000,000
3,600,000
320,000
860.000
4,550,000
420,021
5,270.000
22,163,365
2,643,344
1,000,000
2,500,000
1 ,000,000
3,600,000
420.021
320,000
860,000
4,550,000
5.270,000
22,163,365
889,933,332
10,500,000
2,243,000
1 ,280,000
4,026,000
2,040,000
14,172,000
1 ,900,000
372,900
36,533.900
PRIOR
EXP/ENC
7,956,493
1,467,217
106,009
21,916,490
-
98,593
26,357,286
18,120,926
1 ,985,399
2,484,148
-
69,970
-
-
-
91.912
-
128,365,947
2,643,344
1,000,000
2,500,000
1,000,000
3.600,000
320,000
860,000
4,550.000
420,021
5,270,000
22,163,365
327,450,081
BALANCE YEAR1 YEAR 2 YEAR 3 YEAR 4 YEARS YEAR 6-10 BUILDOUT
FORWARD 2007-2008 2008-2009 2009-2010 2010-2011 2011-2012 2012-2017 2017-2022
1 ,507,593
143,991
7,016,303
-
3,701,407
48,957
520,074
-
249,999
1,185,672
96,774
-
-
417,888
45,497,154
-
150,714,569
775,000 750,000 752,000 762,000 775,000 3,935,000 3,935,000
350,000 350,000 350,000 350.000 250,000 1,250,000 1,000,000
2.289,765
210,000 75,000 300,000 300,000 300,000 900,000
96,000 96,000 96,000 96,000 96,000 540,000 432,000
48,500
90,000 225,000
315,000
80,000
9,096,500 8,059,650 6,091,627 6,240,800 4,259.000 22,824,243 40,795,578
.
2,643.344
1 ,000,000
2,500,000
1 ,000.000
3,600,000
420,021
320,000
860.000
1 ,000,000 1 ,000,000 1 ,000,000 1 ,550,000
2,000,000 3,270,000
2,000,000 - 1 ,420,021 1 ,000,000 1 ,000,000 2,550.000 14,193.344
32,840,779 40,491,146 48.142,515 39,628,871 47,114,854 83,225,567 120,324,950
* Once funding is identified for these projects the project costs will have to be reviewed and jpdated to reflect actual cost estimates. The unfunded projects do
not receive annual inflationary increases.
J-11 J-12
CAPITAL IMPROVEMENT PROGRAM FUND SUMMARY
BTD NO. 2 AVIARA PARKWAY - POINSETTIA
BEGINNING FUND BALANCE (1)
REVENUES
DEVELOPER FEES
TOTAL REVENUES
CAPITAL PROJECTS
BTD#2 REPAYMENT TO GAS TAX FUND
BTD#2/POINSETTIA LANE - REACH E (PARTIAL FUNDING)
BTD#2/POINSETT1A LANE - REACHES A,B, C F & G & AVIARA PKWY
TOTAL PROJECT EXPENDITURES
ENDING FUND BALANCE
LANE
PRIOR
YEARS
N/A
N/A
350,000
350,000
N/A
YEAR1
2007-2008
9,362, Z86
131,310
131,310
9,493,596
YEAR 2 YEAR 3 YEAR 4
2008-2009 2009-2010 2010-2011
9,493,596 10,972,538 9,503,848
1,478,942 131,310 131,310
1,478,942 131,310 131,310
1,600,000
1,600,000
10,972,538 9,503,848 9,635,158
YEAR 5 BUILDOUT
2011-2012 2012++
9,635,158 9,781,058
145,900 7,306,400
145,900 7,306,400
2,643,344
9,100,000
1,320,729
13,064,073
9,781,058 4,023,385
BTD NO. 3 CANNON ROAD WEST
BEGINNING FUND BALANCE (1)
REVENUES
DEVELOPER FEES
TOTAL REVENUES
CAPITAL PROJECTS
BTD#3 CANNON ROAD - FROST TO FARADAY (REIMB.)
BTD#3 CANNON ROAD WEST TO GAS TAX FUND
TOTAL PROJECT EXPENDITURES
ENDING FUND BALANCE
PRIOR
YEARS
N/A
N/A
5,194,747
5,194,747
N/A
YEAR1
2007-2008
1,357,030
54,797
54,797
600,000
600,000
811,827
YEAR 2 YEAR 3 YEAR 4
2008-2009 2009-2010 2010-2011
811,827 853,407 853,407
41,580
41,580
-
853,407 853,407 853,407
YEARS
2011-2012
853,407
8,250
8,250
-
861,657
BUILDOUT
2012++
861,657
3,719,155
3,719,155
400,000
1,000,000
1,400,000
3,180,812
(1) Equal to projected fund balance less any continuing appropriations.K-1
CAPITAL IMPROVEMENT PROGRAM FUND SUMMARY
COMMUNITY FACILITIES DISTRICT NO. 1 (CFD 1)
BEGINNING FUND BALANCE (1)
REVENUES
DEVELOPER SPECIAL TAXES
TOTAL REVENUES
CAPITAL PROJECTS
CIVIC CENTER
PUBLIC WORKS CENTER
LIBRARY EXPANSION (COLE)
LIBRARY EXPANSION (LEARNING CENTER - ADVANCE)
CFD#1 ADMINISTRATION
VETERAN'S MEMORIAL PARK
1-5 AND LA COSTA AVENUE AUXILURY LANES
TOTAL PROJECT EXPENDITURES
ENDING FUND BALANCE
PRIOR
YEARS
N/A
N/A
-
2,708,266
-
4,491,837
124,032
-
-
7,324,135
N/A
YEAR1
2007-2008
49,803,275
1,739,179
1,739,179
110,000
110,000
51,432,454
YEAR 2
2008-2009
51,432,454
2,732,936
2,732,936
110,000
110,000
54,055,390
YEAR 3
2009-2010
54,055,390
3,378,741
3,378,741
13,886,053
110,000
13,996,053
43,438,078
YEAR 4
2010-2011
43,438,078
2,026,125
2,026,125
110,000
110,000
45,354,204
YEARS
2011-2012
45,354,204
1,937,328
1,937,328
26,063,010
110,000
26,173,010
21,118,522
BUILDOLTT
2012++
21,118,522
18,191,602
18,191,602
4,580,016
330,000
22,453,930
2,000,000
29,363,946
9,946,178
1
PIy
RANCHO SANTA FE ROAD PROJECT
BEGINNING FUND BALANCE (1)
REVENUES
DEVELOPER SPECIAL TAXES/OTHER AGENCIES
TOTAL REVENUES
CAPITAL PROJECTS
RANCHO SANTA FE ROAD AND OLIVENHAIN IMPROVEMENTS
RANCHO SANTA FE ROAD NORTH - PHASE I
RANCHO SANTA FE ROAD NORTH - PHASE H (BRIDGE)
RANCHO SANTA FE ROAD SOUTH
TOTAL PROJECT EXPENDITURES
ENDING FUND BALANCE
PRIOR
YEARS
N/A
N/A
3,800,000
26,406,243
18,641,000
1,985,399
50,832,642
N/A
YEAR1
2007-2008
6,855,101
7,978,743
7,978,743
14,833,844
YEAR 2 YEAR 3
2008-2009 2009-2010
14,833,844 20,344,444
5,510,600
5,510,600
20,344,444 20,344/444
YEAR 4 YEAR 5 BUILDOUT
2010-2011 2011-2012 2012++
20,344,444 20,344,444 20,344,444
20,344,444 20,344,444 20,344,444 I
(1) Equal to projected fund balance less any continuing appropriations.K-2
CAPITAL IMPROVEMENT PROGRAM FUND SUMMARY
GAS TAX FUND
BEGINNING FUND BALANCE (1)
REVENUES
GAS TAXES
TOTAL REVENUES
CAPITAL PROJECTS
CARLSBAD BOULEVARD MEDIAN-TAMARACK AVE TO PINE AVE
CLARY BATTERY BACKUP SYSTEMS/RED LED REPLACEMENTS
CONCRETE REPAIR WORK
EL CAMINO REAL MEDIANS
MISCELLANEOUS ROAD SUBDRAINS
PALOMAR AIRPORT RD & MELROSE BLVD RIGHT TURN
PAVEMENT MANAGEMENT PROGRAM
rRAF SIG - ALGA ROAD AND CAZADERO
TRAP SIG - CAMINO DE LOS COCHES AND LA COSTA AVENUE
TRAP SIG - CAMINO VIDA ROBLE AND YARROW DRIVE
TRAP SIG - CANNON ROAD AND COLLEGE BOULEVARD
rRAF SIG - COLLEGE BOULEVARD AND CARLSBAD VILLAGE DR - REIMS
FRAF SIG - MELROSE DRIVE AND LA COSTA AVENUE
FRAF SIG - RANCHO SANTA FE ROAD AND CALLE JUNIPERO
TRAF SIG - FARADAY AVENUE AND PRIESTLY DRIVE
TRAP SIG - LA COSTA AVENUE AND ESFERA STREET
VIDEO DETECTION CONVERSION
GAS TAX LOAN BTD#2
GAS TAX LOAN TO BTD#3 CANNON ROAD WEST
TOTAL PROJECT EXPENDITURES
ENDING FUND BALANCE
PRIOR
YEARS
N/A
N/A
485,000
65,000
9,464,086
303,050
517,000
2,643,344
1,000,000
14,477,480
N/A
YEAR1 YEAR 2 YEAR 3 YEAR 4 YEARS BUILDOUT
2007-2008 2008-2009 2009-2010 2010-2011 2011-2012 2012++
1,908,374 3,208,452 4,557,638 5,806,111 7,345,647 8,955,080
1,918,628 1,976,187 2,035,472 2,196,537 2,159,433 29,141,484
1,918,628 1,976,187 2,035,472 2,196,537 2,159,433 29,141,484
2,041,080
201,550
350,000 350,000 350,000 350,000 250,000 2,250,000
1,452,058
210,000
190,000
190,000
210,000
210,000
190,000
210,000
190,000
67,000 277,000 247,000 307,000 300,000 135,000
618,550 627,000 787,000 657,000 550,000 7,288,138
3,208,452 4,557,638 5,806,111 7,345,647 8,955,080 30,808,426
GOLF COURSE FUND
BEGINNING FUND BALANCE (1)
REVENUES
BOND PROCEEDS
ADVANCES
TOTAL REVENUES
CAPITAL PROJECTS
CARLSBAD MUNICIPAL GOLF COURSE
TOTAL PROJECT EXPENDITURES
ENDING FUND BALANCE
PRIOR
YEARS
N/A
N/A
55,441,655
55,441,655
N/A
YEAR 1 YEAR 2 YEAR 3 YEAR 4 YEAR 5 BUILDOUT
2007-2008 2008-2009 2009-2010 2010-2011 2011-2012 2012++
757,866 757,866 757,866 757,866 757,866 757,866
757,866 757,866 757,866 757,866 757,866 757,866
(1) Equal to projected fund balance less any continuing appropriations.K-3
CAPITAL IMPROVEMENT PROGRAM FUND SUMMARY
GENERAL CAPITAL CONSTRUCTION (GCC)
BEGINNING FUND BALANCE (1) '
REVENUES
LOAN REPAYMENTS & OTHER
TOTAL REVENUES
CAPITAL PROJECTS
CITY ADMIN TRAINING FACILITY (PRE-DESIGN) - Prop C
POLICE CAD IMPLEMENTATION
FIRE STATION #5 STORAGE BUILDING/RESTROOMS
PUBUC SAFETY TRAINING FACILITY - Prop C
LIBRARY EXPANSION (LEARNING CENTER - ADVANCE)
PROPOSITION C PROJECTS
PEDESTRIAN MASTER PLAN
PUBLIC WORKS INVENTORY AND FAC MAINT PROGRAM
REPAIR RECOATING GUARDRAIL PAR BRIDGE AT CARLSBAD BLVD
SENIOR CENTER COURTYARD LANDSCAPING
STAGECOACH PARK PICNIC SHELTER
STAGECOACH PARK SYNTHETIC TURF
SENIOR CTR EXPANSION - 2ND FLOOR
LAKE CALAVERA TRAILS MASTER PLAN/CONSTRUCTION
ALGA NORTE PARK - PHASE H (POOL)
ALGA NORTE PARK - PHASE H (POOL) PROP C FUNDS
LEO CARRILLO PARK - EROSION CONTROL
LEO CARRILLO - HISTORIC BARN (50% GRANT)
CALLE GAVANZO DRAINAGE
HIGHLAND DRIVE - BETWEEN PINE & BASSWOOD
RIDGCREST DRAINAGE IMPROVEMENTS
ROMERIA DRAINAGE IMPROVEMENTS
NW QUADRANT STORM DRAIN IMPROVEMENT PROGRAM
TRAF SIG - AVIARA PARKWAY-POINSETTIA LANE TO EL CAMINO REAL
TRAF SIG - AVIARA PKWY AND CAMINO DE LAS ONDAS- REIMB
TRAF SIG - CALLE BARCELONA AND PASEO AVELLANO
TRAF SIG - CARLSBAD VILLAGE DRIVE AND GLASGOW DR
TRAF SIG - EL FUERTE ST AND RANCHO PANCHO
TRAF SIG - FARADAY AVE. AND CAMINO HILLS DRIVE
TRAF SIG - FARADAY AVENUE AND RUTHERFORD ROAD
TRAF SIG - LA COSTA AVENUE AND LEVANTE
TRAF SIG - LA COSTA AVENUE/NUEVA CASTILLA
TRAF SIG - MONROE STREET AND HOSP WAY
TRAF SIG - POINSETTIA LANE AND BLACKRAIL ROAD
TRAF SIG - POINSETTIA LANE AND BRIGANTINE ROAD
TRAF SIG - RANCHO SANTA FE ROAD AND QUESTHAVEN ROAD
TRAF SIG - RANCHO SANTA FE ROAD AND AVENIDA LA CIMA
TRAF SIG - TAMARACK AVE. AND PONTTAC DRIVE
TRAF SIG - TAMARACK AVE. AND VALLEY STREET
CARLSBAD BLVD BRIDGE CONCRETE BARRIER POWER PLANT
CARLSBAD BLVD BRIDGE CONCRETE BARRIER RAILROAD
CVD AND AVENIDA DE ANITA
CARLSBAD BOULEVARD PEDESTRIAN ACCESS STUDY
PARK DRIVE, MARINA TO COVE
SAN MARCOS ROAD PROJECT
TAMARACK AND ADAMS
UNDERGROUND DIST. 17 - HARDING, ROOSEVELT
MARABELLA WALL BEAUTIFICATION
GCC LOAN TO PFF - ALGA NORTE POOL
GCC LOAN TO PFF - POINSETTIA TENNIS COURTS
GCC LOAN TO PFF - FIRE STATION #3 LAND ACQUISITION
GCC LOAN TO PIL-NW FOR MADISON ST PROPERTY PURCHASES
GCC LOAN TO PIL-NW FOR PINE SCHOOL ACQUISITION
GCC LOAN TO PLDA - HEDIONDA AND CALAVERA CREEK
TOTAL PROJECT EXPENDITURES
n
PRIOR
YEARS
N/A
N/A
2,312,228
316,600
950,000
600,000
150,000
404,992
130,000
30,000
100,000
1,718,000
529,162
598,750
6,000,000
11,239,000
267,000
500,000
62,500
196,101
117,500
274,000
160,000
105,000
210,000
210,000
210,000
124,767
210,000
280,000
20,000
105,000
2,734,147
509,800
2,500,000
3,600,000
1,000,000
320,000
860,000
420,021
40,074,568
N/A
YEAR1 YEAR 2 YEAR 3 YEAR 4 YEARS BUILDOUT HI
2007-2008 2008-2009 2009-2010 2010-2011 2011-2012 2012++
26,619,891 21,057,346 20,420,346 21,059,916 21,301,265 21,367,035 _
BJ
750,000 750,000 1,170,021 750,000 750,000 20,780,000
750,000 750,000 1,170,021 750,000 750,000 20,780,000
Pi
y"
100,000
PBj
y
17,734,205
•j|
W:
PI•- ;j
at
m
4,976,795 !y
•1i
y
305,250 407,000 384,825 408,650 684,230 1,105,400
100,000 "
y
210,000
190,000 P
190,000 H
190,000
190,000 •
210,000 B
190,000
Pi
190,000 *IP
190,000
140,000 880,000 H)
257,000 Is
105,000 *•
145,627 m
eS
48,500 <•)
80,000 _
,
Ht
:
Mi
6,312,545 1,387,000 530,452 508,650 684,230 20,189,605
21,057,346 20,420,346 21,059,916 21,301,265 21,367,035 21,957,430 W
- H
(1) Equal to projected fund balance less any continuing appropriations.K-4
CAPITAL IMPROVEMENT PROGRAM FUND SUMMARY
GRANTS - FEDERAL
BEGINNING FUND BALANCE (1)
REVENUES
GRANT REVENUE
CARLSBAD BOULEVARD ENCINAS CREEK BRIDGE REPLACEMENT
TOTAL REVENUES
CAPITAL PROJECTS
BRIDGE PREVENTITIVE MAINTENANCE PLAN
CARLSBAD BOULEVARD ENCINAS CREEK BRIDGE REPLACEMENT
COASTAL RAIL TRAIL (CMAQ)
TOTAL PROJECT EXPENDITURES
ENDING FUND BALANCE
PRIOR
YEARS
N/A
N/A
297,682
4,413,784
4,711,466
N/A
YEAR1 YEAR 2 YEAR 3 YEAR 4
2007-2008 2008-2009 2009-2010 2010-2011
YEAR 5 BUILDOUT
2011-2012 2012++
1,558,149 ....
100,000
1,863,578
1,963,578 .....
100,000
305,429 1,558,149
405,429 1,558,149 ....
1,558,149 .....
GRANTS - STATE
PRIOR
YEARS
BEGINNING FUND BALANCE (1) N/A
REVENUES
GRANT REVENUE
TOTAL REVENUES N/A
CAPITAL PROJECTS
TOTAL PROJECT EXPENDITURES
ENDING FUND BALANCE N/A
YEAR1 YEAR 2 YEAR 3 YEAR 4
2007-2008 2008-2009 2009-2010 2010-2011
1,647 1,647 1,014,326 1,014,326
1,012,679
YEAR 5 BUILDOUT
2011-2012 2012++
1,014,326 1,014,326
1,012,679 ....
1,647 1,014,326 1,014,326 1,014,326 1,014,326 1,014,326
(1) Equal to projected fund balance less any continuing appropriations.K-5
CAPITAL IMPROVEMENT PROGRAM FUND SUMMARY
INFRASTRUCTURE MAINTENANCE & REPLACEMENT
BEGINNING FUND BALANCE (1)
REVENUES
GENERAL FUND TRANSFER
TOTAL REVENUES
CAPITAL PROJECTS
BEACH ACCESS STAIRS REPLACEMENT
CARLSBAD BLVD STORM DRAIN REPLACEMENT
CMP REPLACEMENT PROGRAM
COLE LIBRARY HVAC REPLACEMENT
CONCRETE REPLACEMENT
CYNTHIA LANE STORM DRAIN
HOLIDAY PARK - RESTROOM IMPROVEMENTS
KELLY DRIVE CHANNEL REPAIR
LA COSTA AVE STORM DRAIN REPLACEMENT
LAGUNA RIVIERA PARK RESTROOM REPLACEMENT
TRAF SIG - CARLSBAD BLVD & TAMARACK SIGNAL REPAIRS
TRAP SIG - ECR AND TAMARACK SIGNAL REPAIRS
TRAF SIG - EL CAMINO REAL AND CHESTNUT SIGNAL REPAIRS
VARIOUS FAaLTTY CONCRETE REPAIRS
TOTAL PROJECT EXPENDITURES
ENDING FUND BALANCE
(IM&R)
PRIOR
YEARS
N/A
N/A
517,500
80,000
1,319,790
1,243,350
100,000
530,808
200,000
492,150
260,000
230,000
141,000
206,000
5,320,598
N/A
YEAR1 YEAR 2 YEAR 3 YEAR 4 YEARS
2007-2008 2008-2009 2009-2010 2010-2011 2011-2012
26,516,531 33,210,781 40,278,781 48,543,781 57,123,781
7,801,000 8,320,000 8,670,000 9,040,000 9,492,000
7,801,000 8,320,000 8,670,000 9,040,000 9,492,000
138,000
575,000 620,000 365,000 460,000 210,000
153,750
240,000 632,000 40,000
1,106,750 1,252,000 405,000 460,000 210,000
33,210,781 40,278,781 48,543,781 57,123,781 66,405,781
BUILDOUT
2012++
66/405,781
109,528,000
109,528,000
-
175,933,781
B
m
M
OTHER
BEGINNING FUND BALANCE (1)
REVENUES
OTHER FINANCING SOURCES
TOTAL REVENUES
CAPITAL PROJECTS
LIBRARY EXPANSION (LEARNING CENTER)
COASTAL RAIL TRAIL
OPPORTUNISTIC SAND
TRAF SIG - AVIARA PARKWAY-POINSETT1A LANE TO EL CAMINO REAL
COLLEGE BLVD REACH A AND CANNON REACH 4A
COLLEGE/CANNON ASSESSMENT DISTRICT
EL FUERTE EXTENSION
FARADAY AVENUE AND MELROSE DRIVE EXTENSIONS
MELROSE DRIVE EXTENSION
MELROSE DRIVE - SOUTH OF PALOMAR AIRPORT ROAD
PALOMAR AIRPORT ROAD AND MELROSE BOULEVARD RIGHT TURN
PALOMAR AIRPORT ROAD WIDENING AT MELROSE DRIVE
POINSETTIA LANE EAST OF EL CAMINO REAL FINANCING PROGRAM
FARADAY/MELROSE TO GCC
TOTAL PROJECT EXPENDITURES
ENDING FUND BALANCE
PRIOR
YEARS
N/A
N/A
1,048,163
184,176
57,240
602,649
1,713,002
10,314,481
4,095,146
16,248,065
5,003,376
228,938
230,980
2,826,268
28,932,793
-
71,485,277
N/A
YEAR1 YEAR 2 YEAR 3 YEAR 4 YEARS BUILDOUT
2007-2008 2008-2009 2009-2010 2010-2011 2011-2012 2012++
2,158,989 2,158,989 2,158,989 2,158,989 1,898,989 1,898,989
.
-
260,000
260,000
2,158,989 2,158,989 2,158,989 1,898,989 1,898,989 1,898,989
PARK FEE ZONES 5,13,16
PRIOR
YEARS
BEGINNING FUND BALANCE (1) N/A
REVENUES
DEVELOPER FEES
TOTAL REVENUES N/A
CAPITAL PROJECTS
BUSINESS PARK RECREATIONAL FACILITY
TOTAL PROJECT EXPENDITURES
ENDING FUND BALANCE N/A
YEAR1
2007-2008
1,505,352
44,346
44,346
1,549,698
YEAR 2
2008-2009
1,549,698
154,434
154,434
1,704,132
YEAR 3
2009-2010
1,704,132
118,737
118,737
1,82%869
YEAR 4
2010-2011
1,822,869
84,579
84,579
1,907,447
YEARS
2011-2012
1,907,447
84,579
84,579
1,992,026
BUILDOUT
2012++
1,992,026
1,023,728
1,023,728
3,015,753
3,015,753
p
Hi
(1) Equal to projected fund balance te»» any continuing appropriations.K-6
CAPITAL IMPROVEMENT PROGRAM FUND SUMMARY
PARK-IN-LIEU NE
BEGINNING FUND BALANCE (1)
REVENUES
DEVELOPER FEES
TOTAL REVENUES
CAPITAL PROJECTS
HIDDEN CANYON PARK (22.3 ACRES)
PARK SITE DEVELOPMENT (15 ACRES)
PARK SITE ACQUISITION (15 ACRES) NE QUADRANT PARK
PIL-NE REPAYMENT OF LOAN FROM PFF FOR PARK ACQUISITION
TOTAL PROJECT EXPENDITURES
ENDING FUND BALANCE
PRIOR
YEARS
N/A
N/A
1,886,766
4,550,000
6,436,766
N/A
YEAR1
2007-2008
228,425
228,425
YEAR 2
2008-2009
228,425
625,459
625,459
853,884
YEARS
2009-2010
853,884
1,389,908
1,389,908
1,000,000
1,000,000
1,243,792
YEAR 4
2010-2011
1,243,792
839,291
839,291
1,000,000
1,000,000
1,083,082
YEARS
2011-2012
1,083,082
871,365
871,365
1,000,000
1,000,000
954,448
BUILDOUT
2012++
954,447
6,500,493
6,500,493
4,000,000
1,550,000
5,550,000
1,904,940
PARK-IN-LIEU NW
BEGINNING FUND BALANCE (1)
REVENUES
DEVELOPER FEES
TOTAL REVENUES
CAPITAL PROJECTS
PINE AVENUE PARK - PINE COMMUNITY BUILDING - PHASE II
PIL-NW TO GCC FOR MADISON ST PROPERTY PURCHASES
PIL-NW TO GCC FOR PINE SCHOOL ACQUISITION
TOTAL PROJECT EXPENDITURES
ENDING FUND BALANCE
PRIOR
YEARS
N/A
N/A
N/A
YEAR1
2007-2008
875,919
149,905
149,905
1,025,824
YEAR 2
2008-2009
1,025,824
299,811
299,811
1,325,635
YEAR 3
2009-2010
1,325,635
449,716
449,716
1,775,351
YEAR 4
2010-2011
1,775,351
142,767
142,767
1,724,039
1,724,039
194,079
YEARS
2011-2012
194,079
149,905
149,905
343,984
BUILDOUT
2012++
343,984
2,241,442
2,241,442
320,000
860,000
1,180,000
1,405,427
PARK-IN-LIEU SE
BEGINNING FUND BALANCE (1)
REVENUES
DEVELOPER FEES
TOTAL REVENUES
CAPITAL PROJECTS
LEO CARRILLO PARK - PHASE III
LEO CARRILLO EVENT AREA EXPANSION
TOTAL PROJECT EXPENDITURES
ENDING FUND BALANCE
PRIOR
YEARS
N/A
N/A
N/A
YEAR1
2007-2008
2,265,074
80,187
80,187
20,550
20,550
2,324,711
YEAR 2
2008-2009
2,324,711
80,187
80,187
246,450
246,450
2,158,448
YEAR 3
2009-2010
2,158/148
80,187
80,187
2,238,635
YEAR 4
2010-2011
2,238,635
85,533
85,533
2,324,168
YEARS
2011-2012
2,324,168
2,324,168
BUILDOUT
2012++
2,324,168
836,800
836,800
1,487,368
PARK-IN-LIEU SW
BEGINNING FUND BALANCE (1)
REVENUES
DEVELOPER FEES
TOTAL REVENUES
CAPITAL PROJECTS
AVIARA COMMUNITY PARK COMMUNITY BUILDING
AVIARA REIMBURSEMENT AGREEMENT
TOTAL PROJECT EXPENDITURES
PRIOR
YEARS
N/A
N/A
238,000
238,000
N/A
YEAR1
2007-2008
840,636
203,140
203,140
1,043,776
YEAR 2
2008-2009
1,043,776
983,627
983,627
2,027/103
YEAR 3
2009-2010
2,027,403
138,991
138,991
2,166,394
YEAR 4
2010-2011
2,166,394
53,458
53,458
2,219,852
YEARS
2011-2012
2,219,852
58,804
58,804
2,278,656
BUILDOUT
2012++
2,278,656
2,763,779
2,763,779
2,607,483
2,607,483
2,434,952
(1) Equal to projected fund balance less any continuing appropriations.K-7
CAPITAL IMPROVEMENT PROGRAM FUND SUMMARY
PLANNED LOCAL DRAINAGE AREA FEES (PLDA)
BEGINNING FUND BALANCE (1)_
REVENUES
DEVELOPER FEES
TOTAL REVENUES
CAPITAL PROJECTS
AGUA HEDIONDA CHANNEL (PLDA "B")
AVIARA PARKWAY STORM DRAIN REIMBURSEMENT (PLDA "C")
COLLEGE BLVD/CANNON RD (BJ AND CALAVERA CR. CHANNEL)
COLLEGE BLVD/CANNON RD (BASIN BJB - REIMB./PLDA "B") (FEMA + PLD)
COLLEGE BLVD. BRIDGE FACILITY BL (REIMB./PLDA "B")
FARADAY/MELROSE DRAINAGE FAdLrnES (PLDA "B")
MASTER PLAN UPDATE
MISCELLANEOUS MASTER DRAINAGE FACILITIES
; PARK DRIVE AND TAMARACK AVENUE STORM DRAIN (PLDA "B")
TAMARACK AND ECR STORM DRAIN AND SILT. BASIN (REIMB./PLDA "B")
IOAN REPAYMENT - HEDIONDA AND CALAVERA CREEK
TOTAL PROJECT EXPENDITURES
ENDING FUND BALANCE
PUBLIC FACILITY FEE FUND (PFF)
BEGINNING FUND BALANCE (1)
REVENUES
DEVELOPER FEES
LOANS
PROP 12 AND PROP 40 GRANT FUNDS
TOTAL REVENUES
CAPITAL PROJECTS
ALGA NORTE PARK - PHASE I (30 ACRES)
ALGA NORTE PARK - PHASE II (POOL)
AVIARA COMMUNITY PARK (24.25 ACRES) *
AVIARA COMMUNITY PARK COMMUNITY BUILDING
CARRILLO BARN RESTORATION
EL CAMINO REAL MEDIANS
EL CAMINO REAL MEDIANS - LA COSTA
FIRE STATION #3 RELOCATION
FIRE STATION #6 (PERMANENT)
LEO CARRILLO PARK - PHASE III
LIBRARY EXPANSION (COLE)
LOAN REPAYMENT - ALGA NORTE POOL
LOAN REPAYMENT - FIRE STATION #3 LAND ACQUISITION
LOAN REPAYMENT - POINSETTIA TENNIS COURTS
PINE AVENUE PARK - PINE COMMUNITY BUILDING - PHASE II
PINE AVENUE PARK - PHASE I
POINSETTIA COM. PARK - TENNIS COURTS & COMMUNITY CENTER
POINSETTIA COMMUNITY PARK - PARKING
TRAP SIG - CANNON ROAD AND AVENIDA ENCINAS
TRAF SIG - PALOMAR AIRPORT ROAD AND MELROSE DRIVE
TRAF SIG - POINSETTIA LANE AND EL FUERTE STREET (REIMB)
PFF LOAN TO PIL-NE FOR PARK LAND ACQUISITION
TOTAL PROJECT EXPENDITURES
ENDING FUND BALANCE
PRIOR
YEARS
N/A
N/A
1,680,522
2,778,833
830,910
300,000
454,933
6,045,198
N/A
YEAR1
2007-2008
6,932,273
244,733
244,733
-
7,177,006
PRIOR
YEARS
N/A
N/A
15,912,570
6,099,695
10,700,000
33,000
909,500
90,500
1,000,000
5,830,000
7,082,000
1,089,200
150,000
250,000
210,000
4,550,000
53,906,465
N/A
YEAR1
2007-2008
14,663,737
1,544,044
100,000
744,000
2,388,044
6,194,940
60,215
6,255,155
10,796,626
YEAR 2
2008-2009
7,177,006
244,733
244,733
-
7,421,739
YEAR 2
2008-2009
10,796,626
3,616,110
238,745
3,854,855
476,560
903,185
1,379,745
13,271,736
YEAR 3 YEAR 4
2009-2010 2010-2011
7,421,739 7,338,621
336,904 203,089
336,904 203,089
420,021
420,021
7,338,621 7,541,711
YEAR 3 YEAR 4
2009-2010 2010-2011
13,271,736 11,425,963
3,721,466 1,982,817
238,292 387,000
3,959,758 2,369,817
5,221,440 103,600
584,091 7,041,087
914,606
5,805,531 8,059,293
11,425,963 5,736,487
YEARS
2011-2012
7,541,711
214,654
214,654
-
7,756,365
YEARS
2011-2012
5,736,487
1,881,877
1,881,877
11,656,432
11,656,432
(4,038,068)
BUILDOUT
2012++
7,756,365
7,960,475
7,960,475
1,847,188
10,936,000
610,000
1,279,000
14,672,188
1,044,652
BUILDOUT
2012++
(4,038,068)
17,644,829
-
17,644,829
7,374,076
1,987,400
9,832,400
2,500,000
1,000,000
3,600,000
26,293,876
(12,687,116)
(1) Equal to projected fund balance less any continuing appropriations.K-8
CAPITAL IMPROVEMENT PROGRAM FUND SUMMARY
REDEVELOPMENT - VILLAGE
BEGINNING FUND BALANCE (1)
REVENUES
TAX INCREMENT AND LOANS
TOTAL REVENUES
CAPITAL PROJECTS
VILLAGE PUBLIC PARKING ENHANCEMENT PROGRAM
SENIOR CTR EXPANSION - 1ST FLOOR
STOEETSCAPE IMPROVEMENTS
CARLSBAD BLVD. AT STATE ST - INTERSECTION ENHANCEMENT DESIGN
TOTAL PROJECT EXPENDITURES
ENDING FUND BALANCE
PRIOR
YEARS
N/A
N/A
1,082,044
100,000
100,000
1,282,044
N/A
YEAR1
2007-2008
176,320
100,000
100,000
276,320
YEAR 2
2008-2009
276,320
300,000
300,000
300,000
300,000
276,320
YEAR 3
2009-2010
276,320
276,320
YEAR 4
2010-2011
276,320
276,320
YEARS
2011-2012
276,320
276,320
BUILDOUT
2012++
276,320
850,000
850,000
850,000
850,000
276,320
REDEVELOPMENT - SCCRDA
BEGINNING FUND BALANCE (1)
REVENUES
TAX INCREMENT AND LOANS
TOTAL REVENUES
CAPITAL PROJECTS
CARLSBAD BLVD. AT BREAKWATER ROAD - LEFT TURN LANE
CARLSBAD BOULEVARD ENdNAS CREEK BRIDGE REPLACEMENT
TOTAL PROJECT EXPENDITURES
ENDING FUND BALANCE
PRIOR
YEARS
N/A
N/A
243,150
339,135
582,285
N/A
YEAR1
2007-2008
4,463
YEAR 2
2008-2009
4,463
YEAR 3
2009-2010
4,463
YEAR 4
2010-2011
4,463
YEARS
2011-2012
4,463
BUILDOUT
2012++
4,463
4,463 4,463 4,463 4,463 4,463 4,463
SEWER BENEFIT AREA FEES (SBA)
BEGINNING FUND BALANCE (1)
REVENUES
DEVELOPER FEES
TOTAL REVENUES
CAPITAL PROJECTS
CARLSBAD TRUNK SEWER REACHES VCT1A, VCT1B, VCT1C (SBA 'A")
SBA A TO SEWER REPLACEMENT FOR CARLSBAD TRUNK SEWER
SBA C,D,E,F TO SEW REPL FOR S AGUA HEDIONDA INTERCEPTOR
SOUTH AGUA HEDIONDA LIFT STATION AND FORCE MAIN
TOTAL PROJECT EXPENDITURES
ENDING FUND BALANCE
PRIOR
YEARS
N/A
N/A
8,827,415
8,827,415
N/A
YEAR1
2007-2008
4,155,346
151,538
151,538
2,000,000
2,000,000
2,306,884
YEAR 2
2008-2009
2,306,884
666,049
666,049
2,972,933
YEARS
2009-2010
2,972,933
671,379
671,379
3,644,312
YEAR 4
2010-2011
3,644,312
574,520
574,520
4,218,832
YEARS
2011-2012
4,218,832
593,579
593,579
103,600
103,600
4,708,811
BUILDOUT
2012++
4,708,811
3,784,053
3,784,053
437,365
3,270,000
3,707,365
4,785,499
SEWER CONNECTION FEE FUND
BEGINNING FUND BALANCE (1)
REVENUES
DEVELOPER FEES
OTHER AGENCY CONTRIBUTIONS (VISTA)
TOTAL REVENUES
CAPITAL PROJECTS
PHASE IV EXPANSION - DEBT SERVICE
PHASE V EXPANSION
BUENA VISTA LIFT STATION
SEWER MONITORING PROGRAM
VISTA/CARLSBAD INTERCEPTOR AGUA HEDIONDA LIFT STATION (VC12)
VISTA/CARLSBAD INTERCEPTOR REACH VC11B
VISTA/CARLSBAD INTERCEPTOR REACH VC13 TO VC15
VISTA/CARLSBAD INTERCEPTOR REPLACEMENT REACH 3
TOTAL PROJECT EXPENDITURES
ENDING FUND BALANCE
PRIOR
YEARS
N/A
N/A
933,944
8,321,188
44,000
1,119,360
3,549,000
1,800,000
15,767,492
N/A
YEAR1
2006-2007
16,859,836
1,581,576
2,452,359
4,033,935
935,507
1,647,353
22,000
700,000
3,304,860
17,588,911
YEAR 2
2007-2008
17,588,911
859,084
859,084
937,169
22,000
7,307,799
11,715,200
73,220
20,055,388
(1,607,393)
YEAR 3
2008-2009
(1,607,393)
740,908
14,415,987
15,156,895
933,006
22,000
523,000
1,478,006
12,071,496
YEAR 4
2009-2010
12,071,496
447,619
2,408,645
2,856,264
931,418
22,000
2,092,000
3,045,418
11,882,342
YEARS
2010-2011
11,882,342
406,314
406,314
932,468
22,000
954,468
11,334,188
BUILDOUT
201 1++
11,334,188
5,055,768
1,336,812
6,392,581
2,788,079
1,491,978
198,000
4,478,057
13,248,712
(1) Equal to projected fund balanc* !•*• any continuing appropriations.K-9
CAPITAL IMPROVEMENT PROGRAM FUND SUMMARY
SEWER REPLACEMENT FUND
BEGINNING FUND BALANCE (1)
REVENUES
TRANSFER FROM OPERATING FUND
LOAN REPAYMENTS
TOTAL REVENUES
CAPITAL PROJECTS
PUBLIC WORKS CENTER
BUENA VISTA LAGOON SEWAGE SPILL
BUILDING IMPROVEMENTS
CAPITAL ACQUISmONS/REPLACEMENT/REHAB
PUMP STATION INTERFACES
STAFFING/PROF. SERVICES AND MISC.
TECHNOLOGY ENHANCEMENT
AVENIDA ENdNAS GRAVITY SEWER
FARADAY AVENUE - ORION TO MELROSE SEWER
FOREST GRAVITY SEWER
HOME PLANT - PIPELINE REPLACEMENT
HOME PLANT LIFT STATION REHABILITATION
LA COSTA MEADOWS SEWER EXTENSION
LA GOLONDRIA SEWER EXTENSION
NORTH AGUA HEDIONDA INTERCEPTOR REHAB - EAST SEGMENT
NORTH AGUA HEDIONDA INTERCEPTOR - WEST SEGMENT
NORTH AGUA HEDIONDA TRUNK SEWER REACH NAHT1A
NORTH BATIQUITOS INTERCEPTOR REHABILITATION
NORTH BATIQUITOS SEWAGE LIFT STATION MODIFICATIONS
POINSETTIA LANE SEWER RELOCATION - Reimb
POINSETTIA SEWAGE LIFT STATION ODOR/NOISE ABATEMENT
PRIOR
YEARS
N/A
N/A
750,000
4,303,491
1,494,614
110,200
900,000
440,000
210,000
654,000
319,244
4,177,751
1,199,000
647,193
545,000
SEWER LIFT STAT. REMOVALS - GATESHEAD, VILLAS, SIMSBURY, VANCOUVER
SEWER LIFT STATION REPAIRS AND UPGRADES
SEWER LINE REFURBISHMENTS/REPLACEMENT
SEWER MASTER PLAN/CONNECTION FEE UPDATE
VISTA/CARLSBAD INTERCEPTOR REHAB REACHES 1 AND 2
BUENA INTERCEPTOR SEWER IMPROVEMENTS
TERRAMAR LIFT STATION EMERGENCY GENERATOR
PHASE II LOAN TO RECYCLED WATER
SEWER REPL TO SEW BENEF A FOR CARLSBAD TRUNK SEWER
DEMO CALAVERA HILLS TREATMENT PLANT
TOTAL PROJECT EXPENDITURES
ENDING FUND BALANCE
580,380
1,260,000
830,975
460,000
25,000
5,270,000
24,176,848
N/A
YEAR1
2007-2008
13,475,475
3,280,000
2,000,000
5,280,000
696,031
829,520
347,395
1,140,000
500,000
23,500
3,536/446
15,219,029
YEAR 2
2008-2009
15,219,029
3,356,200
-
3,356,200
878,849
266,963
650,000
119,474
400,000
80,000
330,000
1,380,000
180,958
57,000
4,343,244
14,231,985
YEAR 3 YEAR 4 YEARS BUILDOUT
2009-2010 2010-2011 2011-2012 2012++
14,231,985 10,174,867 12,369,685 14,313,502
3,434,686 3,515,527 3,598,792 39,676,036
3,270,000
3/134,686 3,515,527 3,598,792 42,946,036
3,730,640
1,273,982 890,709 870,775 8,707,750
1,743,682
100,000 100,000 100,000 400,000
330,000 330,000 330,000 2,254,600
354,200
313,500
7/491,804 1,320,709 1,654,975 11,362,350
10,174,867 12,369,685 14,313,502 45,897,188
Pk
IfMI
—WJ
Mi
mi f
m
Mi
* i
fl
Ml
_
»
|g
I
(1) Equal to projected fund balance less any continuing appropriations.K-10
CAPITAL IMPROVEMENT PROGRAM FUND SUMMARY
TRAFFIC IMPACT FEES (TIF)
BEGINNING FUND BALANCE (1)
REVENUES
DEVELOPER FEES
MISC. REIMBURSEMENTS
TOTAL REVENUES
CAPITAL PROJECTS
TRAP SIG - FARADAY AVENUE AND ORION STREET
AVENIDA ENCINAS WIDENING - SOUTH OF PALOMAR AIRPORT ROAD
CARLSBAD BOULEVARD WIDENING - CANNON TO MANZANO
CARLSBAD VILLAGE DRIVE WIDENING
EL CAMINO REAL AND CARLSBAD VILLAGE DRIVE
EL CAMINO REAL AND FARADAY AVENUE
EL CAMINO REAL ATAVIARA PARKWAY/ ALGA ROAD
EL CAMINO REAL WIDENING - LA COSTA AVENUE TO ARENAL ROAD
EL CAMINO REAL WIDENING - TAMARACK AVENUE TO CHESTNUT AVE.
EL CAMINO REAL WIDENING - S CHESTNUT/S ALGA
MELROSE DRIVE AND ALGA ROAD
PALOMAR AIRPORT ROAD AND COLLEGE BOULEVARD
PALOMAR AIRPORT ROAD WIDENING AT PASEO DEL NORTE
POINSETTIA LANE WIDENING (PASEO DEL NORTE TO BAT1QUITOS LN)
SIDEWALK/STREET CONSTRUCTION PROGRAM
TRAFFIC MONITORING PROGRAM
VALLEY AND MAGNOLIA SIDEWALKS
TOTAL PROJECT EXPENDITURES
ENDING FUND BALANCE
PRIOR
YEARS
N/A
N/A
289,550
225,000
1,235,941
1,382,708
522,115
525,000
1,185,672
166,744
5,532,730
N/A
YEAR 1 YEAR 2 YEAR 3 YEAR 4
2007-2008 2008-2009 2009-2010 2010-2011
8,286,464 8,485,244 9,516,348 10,321,436
594,781 1,427,103 1,201,089 798,230
.
594,781 1,427,103 1,201,089 798,230
210,000 75,000 300,000 300,000
96,000 96,000 96,000 96,000
90,000 225,000
396,000 396,000 396,000 396,000
8,485,244 9,516,348 10,321,436 10,723,666
YEAR 5 BUILDOUT
2011-2012 2012++
10,723,666 11,056,798
729,132 7,996,127
0
729,132 7,996,128
758,000
2,449,063
1,542,042
346,770
305,591
550,497
587,342
173,385
2,289,765
300,000 900,000
96,000 972,000
396,000 10,874,455
11,056,798 8,178,470
TRANSNET/BICYCLE
BEGINNING FUND BALANCE (1)
REVENUES
TRANSNET REVENUE
TOTAL REVENUES
CAPITAL PROJECTS
BICYCLE MASTER PLAN
COASTAL RAIL TRAIL
TOTAL PROJECT EXPENDITURES
ENDING FUND BALANCE
PRIOR
YEARS
N/A
N/A
150,000
221,800
371,800
N/A
YEAR1 YEAR 2 YEAR 3 YEAR 4 YEARS BUILDOUT
2007-2008 2008-2009 2009-2010 2010-2011 2011-2012 2012++
18,105 18,105 18,105 18,105 18,105 18,105
18,105 18,105 18,105 18,105 18,105 18,105
TRANSNET/HIGHWAY
BEGINNING FUND BALANCE (1)
REVENUES
TRANSNET REVENUE
TOTAL REVENUES
CAPITAL PROJECTS
CANNON ROAD REACH 4B
TOTAL PROJECT EXPENDITURES
ENDING FUND BALANCE
PRIOR
YEARS
N/A
N/A
1,761,000
1,761,000
N/A
YEAR1 YEAR 2 YEAR 3 YEAR 4 YEARS BUILDOUT
2007-2008 2008-2009 2009-2010 2010-2011 2011-2012 2012++
266,106 266,106 266,106 266,106 266,106 266,106
266,106 266,106 266,106 266,106 266,106 266,106
(1) Equal to protected fund balance less any continuing appropriations.K-11
CAPITAL IMPROVEMENT PROGRAM FUND SUMMARY
TRANSNET-LOCAL
BEGINNING FUND BALANCE (1)
REVENUES
TRANSPORTATION TAXES
NON JURISDICTIONAL FEES
TOTAL REVENUES
CAPITAL PROJECTS
TRAP SIG - EL CAM. REAL/PLAZA/MARRON/HOSP WY
CARLSBAD BOULEVARD ENdNAS CREEK BRIDGE REPLACEMENT
CARLSBAD BOULEVARD RETROFIT OVER SDNR
EL CAMINO REAL WIDENING - LISA STREET TO CRESTVIEW DR (LOAN)
EL CAMINO REAL WIDENING - NORTH OF COUGAR DRIVE (LOAN)
EL CAMINO REAL WIDENING - TAMARACK AVENUE TO CHESTNUT
PAVEMENT MANAGEMENT PROGRAM (NON-JURIS FEES)
PAVEMENT MANAGEMENT PROGRAM
VALLEY AND MAGNOLIA SIDEWALKS
TOTAL PROJECT EXPENDITURES
ENDING FUND BALANCE
PRIOR
YEARS
N/A
N/A
1,311,000
38,568
1,519,000
493,000
1,467,217
20,719,348
25,548,133
N/A
YEAR1
2007-2008
5,967,840
2,947,000
775,000
3,722,000
39,571
3,300,000
775,000
2,600,000
6,714,571
2,975,269
YEAR 2
2008-2009
2,975,269
3,878,679
750,000
4,628,679
201,501
959,000
750,000
2,650,000
315,000
4,875,501
2,728/447
YEAR 3
2009-2010
2,728,447
2,979,000
752,000
3,731,000
752,000
2,848,000
3,600,000
2,859,447
YEAR 4
2010-2011
2,859/447
3,158,000
762,000
3,920,000
762,000
4,732,800
5/494,800
1,284,647
YEARS
2011-2012
1,284,647
3,315,000
775,000
4,090,000
775,000
2,838,000
3,613,000
1,761,647
BUILDOUT
2012++
1,761,647
33,150,000
7,870,000
41,020,000
7,870,000
26,311,500
34,181,500
8,600,147
TRANSNET - SURFACE TRANSPORTATION
BEGINNING FUND BALANCE (1)
REVENUES
STP REVENUE
TOTAL REVENUES
CAPITAL PROJECTS
TOTAL PROJECT EXPENDITURES
ENDING FUND BALANCE
PROGRAM (STP)
PRIOR
YEARS
N/A
N/A
N/A
YEAR1 YEAR 2 YEAR 3 YEAR 4 YEARS BUILDOUT
2007-2008 2008-2009 2009-2010 2010-2011 2011-2012 2012++
95,051 95,051 95,051 95,051 95,051 95,051
95,051 95,051 95,051 95,051 95,051 95,051
I
I
I
E
ft.
p
(1) Equal to projected fund balance less any continuing appropriations.K-12
CAPITAL IMPROVEMENT PROGRAM FUND SUMMARY
WATER - MAJOR FACILITY FEE FUND
BEGINNING FUND BALANCE (1)
REVENUES
DEVELOPER FEES
TOTAL REVENUES
CAPITAL PROJECTS
"D" RESERVOIR - PHASE II
CALAVERA HILLS WATER BOOSTER STATION STANDBY GENERATOR
CANNON ROAD EAST OF EL CAMINO REAL - Reimb
COLLEGE BOULEVARD - CANNON TO BADGER LANE
COLLEGE BOULEVARD (ECRTO CANNON ROAD) - Reimb
EL CAMINO REAL BETWEEN COLLEGE AND JACKSPAR
EL CAMINO REAL CROSSING AT KELLY DRIVE
EL FUERTE - NORTH OF LOKER - Reimb
EL FUERTE - ALGA ROAD TO POINSETTIA LANE - Reimb
EL FUERTE - POINSETTIA LANE TO PALOMAR AIRPORT ROAD - Reimb
FARADAY AVENUE - ORION TO MELROSE WATERUNE - Reimb
FARADAY AVENUE EXTENSION - Reimb
MAERKLE PUMP STATION IMPROVEMENTS
MAERKLE RESERVOIR STORAGE (TAP #2}
MARRON ROAD - PRESSURE REGULATING STATION TO OCEANSIDE
MASTER PLAN UPDATE
MELROSE DRIVE - PALOMAR AIRPORT ROAD TO FARADAY - Reimb
PAR/ECR PUMP STATION
POINSETTIA LANE - EL CAMINO REAL TO SKIMMER CT (Reimb)
POINSETTIA LANE • SKIMMER CT TO CASSIA
POINSETTIA LANE EAST OF BLACK RAIL ROAD 12"
PRESSURE REDUCING STATION - SYCAMORE CREEK
RANCHO CARRILLO OVERSIZING/EXTENSION
TOTAL PROJECT EXPENDITURES
ENDING FUND BALANCE
PRIOR
YEARS
N/A
N/A
760,800
971,275
725,000
148,750
2,000,000
1,141,000
97,210
54,425
997,350
93,700
6,989,510
N/A
YEAR1 YEAR 2 YEAR 3 YEAR 4 YEARS BUILDOUT
2007-2008 2008-2009 2009-2010 2010-2011 2011-2012 2012++
14,990,184 15,731,115 15,557,463 17,202,741 3,176,787 4,050,784
740,931 1,907,656 1,697,579 900,269 873,997 10,326,362
740,931 1,907,656 1,697,579 900,269 873,997 10,326,362
6,193,311
52,300 416,517
746,949
487,436
749,773
692,675
13,762,757
741,221
47,800
796,300
121,478
370,610
222,691
121,478
2,081,309 52,300 14,926,223 - 8,463,464
15,731,115 15,557,463 17,202,741 3,176,787 4,050,784 5,913,682
WATER - RECYCLED WATER FUND
BEGINNING FUND BALANCE (1)
REVENUES
LOANS & GRANTS
CONNECTION FEES
TOTAL REVENUES
CAPITAL PROJECTS
RECYCLED WATER PH II - FACILITY
RECYCLED WATER PH II - FLOW EQUALIZATION
RECYCLED WATER PH H - MAHR RESERVOIR IMPROV.
RECYCLED WATER PH II - PIPELINES
RECYCLED WATER PH II - PUMP STATIONS
TOTAL PROJECT EXPENDITURES
ENDING FUND BALANCE
PRIOR
YEARS
N/A
N/A
12,130,019
4,127,402
2,957,000
21,852,521
4,918,574
45,985,516
N/A
YEAR1 YEAR 2 YEARS YEAR 4 YEARS BUILDOUT
2007-2008 2008-2009 2009-2010 2010-2011 2011-2012 2012++
-
(1) Equal to projected fund balance less any continuing appropriations.K-13
CAPITAL IMPROVEMENT PROGRAM FUND SUMMARY
WATER REPLACEMENT FUND
BEGINNING FUND BALANCE (1)
REVENUES
TRANSFER FROM OPERATING FUND
LOAN REPAYMENTS
TOTAL REVENUES
CAPITAL PROJECTS
ECR/TAMARACK PUMP STATION REMOVAL
PUMP STATION REMOVAL
PUBLIC WORKS CENTER
"D" RESERVOIR - PHASE II
"D" RESERVOIR - BLACKRAIL ROAD IMPROVEMENTS
AVIARA PARKWAY AT PLUM TREE
CATHODIC PROTECTION PROGRAM
CARLSBAD BOULEVARD - SOUTH OF AVENIDA ENCINAS
CHESTNUT AVENUE RECYCLED WATER LINE
COLLEGE BOULEVARD- MAERKLE RESERVOIR TO AGUA HEDIONDA CREEK
CRESTVIEW DRIVE TRANSMISSION MAIN
DEMOLITION OF WATER FACILITIES AT PMAMA DRIVE
DESALINATION GROUNDWATER/SEAWATER STUDY
EL CAMINO REAL - PALOMAR AIRPORT ROAD SOUTH
EL CAMINO REAL TRANSMISSION MAIN FROM FARADAY TO COUGAR DRIVE
EL CAMINO REAL/CARLSBAD VILL DR PIPELINE REPL.
EL FUERTE AND CORINTTA STREET
ELLERY WATER PUMP PROJECT
FOUSSAT ROAD WELL ABANDONMENT
1-5 RECYCLED WATER TRANSMISSION LINE
LAKE CALAVERA RESERVOIR IMPROVEMENTS
MAERKLE PUMP STATION IMPROVEMENTS
MAERKLE RESERVIOUR BRIDGE REPLACEMENT
MAERKLE DAM FLOATING COVER DRAINPIPE REPLACE
MISCELLANEOUS PIPELINE REPLACEMENT PROJECTS
MISCELLANEOUS WATER RESERVOIR FENCING
OCEANSIDE INTERTIE UPGRADE
PAR/ECR PUMP STATION
POINSETTIA LANE - SKIMMER CT TO CASSIA
POINSETTIA LANE EAST OF BLACK RAIL ROAD 12"
PUMP STATION REMOVAL
RANCHO SANTA FE RD PIPELINE REPLACEMENT
SAN MARCOS BOULEVARD WEST OF SDCWA
TANGLEWOOD PRESSURE REDUCING STATION REPLACEMENT
TAP RESERVOIR EXTERIOR PAINTING
WATER OPERATIONS WATER PUMP PROJECT-
WATER SYSTEM INTERTIE CONNECTION
TOTAL PROJECT EXPENDITURES
ENDING FUND BALANCE
PRIOR
YEARS
N/A
N/A
442,700
367,000
495,000
60,000
3,225,000
774,100
269,975
60,900
202,500
133,305
6,097,235
54,425
200,000
1,000,000
120,399
990,350
773,000
3,091,241
354,750
439,000
19,150,880
N/A
YEARl YEAR 2 YEAR 3 YEAR 4 YEARS BUILDOUT III
2007-2008 2008-2009 2009-2010 2010-2011 2011-2012 2012++
24,087,808 26,561,895 28,707,775 22,246,635 24,795,889 28,992,433 wm3,934,010 4,025,240 4,119,208 4,215,994 4,315,684 49,344,348
.
3,934,010 4,025,240 4,119,208 4,215,994 4,315,684 49,344,348 •Hm
80,019
Ml6,927,118 If
2,064,365 «^
459,612
624,000 475,800 146,900 fH
886,171 A
436,100
376,560 2,886,960
31,380 119,139 pm
35,500 Hi
719,260 M
rf
156,272 yj
145,000
133,305 HI
549,673 [J
692,675 *•
28,750 172,500
418,400 428,651 3
77,000 H
110,700
472,583 II
222,583 E
1,459,923 1,879,360 10,580,348 1,666,740 119,139 4,171,466 Pi
26,561,895 28,707,775 22,246,635 24,795,889 28,992,433 74,165,316
PIM
HI
m
m
(1) Equal to projected fund balance less any continuing appropriations.K-14
GLOSSARY OF CAPITAL PROJECT FUNDING SOURCES
Assessments Districts (ASMT DIST) - Capital projects financed by the issuance of Assessment
** District bonds. Projects include street construction and improvements to Alga Road, College
Boulevard, and the proposed Poinsettia Lane East district.
«• Bridge and Thoroughfare Districts - Bridge and Thoroughfare District No. 3 developer fees to
partially fund Cannon Road improvements. Bridge and Thoroughfare District No. 2 developer
* fees to partially fund the Poinsettia Lane and Aviara Parkway street construction project.
CFD #1 - The City of Carlsbad Community Facilities District No. 1 (Mello-Roos) funds civic
m projects, I-5 interchanges, and road segments.
m CFD #3 - The newly established City of Carlsbad Community Facilities District No. 3 will fund
m improvements within the Faraday/Mel rose area.
** Federal Grants (FED GRNT) - Projects funded from Federal Grants include the Coastal Rail
Trail and the Carlsbad Boulevard Encinas Creek Bridge Replacement.
ii Gas Tax - Gas Tax funding for street projects are received under the Streets & Highways Code
of the State of California.
m
m General Capital Const. (GCC) - General Capital Construction funds, created through fund
transfers from the City's General Fund, are used to fund various municipal and other capital
M projects.
IB Golf Course - The Golf Course Enterprise fund is used to pay for construction of the City's
(p. Municipal Golf Course.
*" Infrastructure Replacement Fund - Annual transfers from the General fund pay for major
maintenance and replacement of the City's infrastructure.
«• Other - Sources include revenues related to pending financing districts such as College-Cannon
and Faraday-Melrose, or contributions from other agencies.
te Park in Lieu (PIL) - Park in Lieu Fees are charged to developers for park acquisition and
development. PIL fees are segregated by quadrant to fund park projects: PIL Area 1 NW, PIL
•- Area 2 NE, PIL Area 3 SW, and PIL Area 4 SE.
lM Planned Local Drainage (PLD) - Drainage facilities necessitated by growth are paid from
„. developer Planned Local Drainage Fees.
** Public Facilities Fees (PFF) - Public Facilities Fees are charged to developers to fund civic
facilities, park development, streets, traffic signals, and other facilities.
«• Sewer Benefit Area Fees (SEW BENEF) - Development fees collected for the construction and
improvement of interceptor systems located within specific Benefit Areas.
M Sewer Connection (SEWER CONN) - Development fees include Sewer Connection charges for
expansion of sewer lines and facilities.
K-15
Sewer Replacement (SEWER REPL) - Sewer Replacement is part of sewer user fees and pays
for repair and replacement of the City's existing sewer system.
State Grants (ST GRANT) - State Grants include funding for the Coastal Rail Trail and Traffic
Congestion Relief Funds.
Tax Increment Bond (REDVL VILLAGE) - Property taxes generated by increases in assessed
values in the Redevelopment project area. Funds are used to repay Tax Increment Bonds and
finance land acquisition and project construction in the downtown Village district.
Tax Increment (REDVL SCCRDA) - Property taxes generated by increases in assessed values
in the South Carlsbad Coastal Redevelopment project area. Funds are used to pay for project
construction and land acquisition in the south Carlsbad district.
TDA - City street and bicycle projects receive funding from Transportation Development Act
sales tax receipts.
Traffic Impact Fees (TIF) - Developer Traffic Impact Fees are used for various street
construction and improvement projects.
TransNet (TRNSNT/BIKE. /HWY. /LOCAL. /STP) - Receipts of County Sales Taxes allocated by
the San Diego Regional Transportation Commission finance various bicycle, freeway
interchange, and local road improvement projects.
Water Connection (WATER CONN) - Development fees include Major Facility Fees used to fund
expansion of water lines and various water projects.
Water Replacement (WATER REPL) - Water Replacement funds are included in water utility
rates and pay for the repair and replacement of existing water lines and facilities.
Water Recycled (RECL WATER) - Revenues used to fund Recycled Water projects, including
Federal and State grants and loans for construction of the Phase II facility, pipelines, flow
equalization, and reservoir improvements.
Zone 5. 13. 16 Park Fee (ZONE 5) - Fees paid by development in Local Facilities Management
Zones 5, 13, and 16 to fund the proposed Business Park Recreational Facility in the City's
industrial corridor.
K-16
City of
Carlsbad
Calif or ni a
,•V-.. ••"''•'•*•*f,
ancin
ua ire ppendices
CITY OF CARLSBAD
PLANNED MAJOR CAPITAL OUTLAY ITEMS 2007-2008
Department Item Description Qtv
[GENERAL FUND
POLICE
Traffic
Traffic
Administration
FIRE
Fire Emergency Operations
Fire Emergency Operations
PARKS
FACILITIES
ENGINEERING
Police Motorcycle ( with equipment )
800 MHz handheld radios
Voiceprint Call Recorder Replacement
Subtotal Police
Station Alerting System
Emergency Fire Shelters
Subtotal Fire
La Costa Canyon Park Restroom Remodel/Stagecoach Park Restroom F
Replacement of Guardrail - Holiday Park Gazebo
Subtotal Parks
Truck, 1/2 Ton Utility
Calavera and Stagecoach Community Center Gym Floor Resurfacing
Dove Library HVAC Energy Savings Project
Carpet Replacement - Senior. Ctr., Fire Station #2, #3, #4
Subtotal Facilities
SUV, Full Size
Subtotal Engineering
2
3
1
1
70
2
1
1
1
1
4
1
[TOTAL GENERAL FUND
One - Time
Cost
I
76,000
16,500
50,000
142,500
175,000
35.000
210,000
280,000
35,000
315,000
24,000
50,000
35,000
50,000
159,000
25,000
25,000
$851,500
IOTHER FUNDS
POLICE ASSET FORFEITURE
Administration
STREET LIGHT MAINTENANCE
SANITATION
Wastewater - Existing Program
Wastewater Operations Enterprise
POTABLE AND RECYCLED WATER OP
STORM WATER PROGRAM
FLEET MAINTENANCE
VEHICLE REPLACEMENT
INFORMATION TECHNOLOGY
Terminal Server
Subtotal Police
Street Light Pole Replacement/Safety Uparade
Subtotal Street Light Maintenance
Vactor Truck
Vactor Truck
Video (CCTV) Inspection Van
Pickup Truck, 1/2 - Ton
Pickup Truck, 1/2 -Ton
Subtotal Sanitation
i Compact Pick Up Truck
Subtotal Potable and Recycled Water Ops
Compact Pick Up Truck
Subtotal Storm Water
ARI-Hetra HDML-8 Heavy Duty Mobile Vehicle Lifts
Subtotal Reet Maintenance
Sedan, Intermediate
SUV, Intermediate 4x4
Truck, 3/4 Ton Utility
Truck, 1/2 Ton Utility
SUV, Full Size 4x4
Truck, 1 Ton Utility, Fleet
Sedan, Intermediate
Diesel Engine Retrofits
Van, Full Size
Truck, 3/4 Ton Utility
Truck 1 Ton Utility
Sedan, IntermediateSUV, Full Size 4x4, Police
Sedan, Police
Sedan, Intermediate
Truck, 1 Ton Utility (Ace Rpl)
Sedan, Intermediate (Ace Rpl)
Motorcycle, Full Size BMW
Pickup 1/2 Ton
Pickup 3/4 Ton
Pickup 1/2 Ton (Ace Rpl)
Pickup, 1/2 Ton (Ace Rpl)
Subtotal Vehicle Replacement
Annual Replacement of desktop hardware - 4 workstation class compute
Dove Firewall Replacement
Replacement of 40 laptops
Replace up to 13 laptops (Police)
Annual replacement of Network Printers
Annual replacement of desktop hardware - 70 monitors throughout City
Annual replacement of network hardware - 260 desktop computers
Annual replacement of plotters
Subtotal - Replacement Assets
1
22
1
1
1
1
1
1
2
2
1
2
1
1
1
1
1
1
1
1
21
2
4
1
1
2
2
1
1
1
2
31
4
2
40
13
14
70
260
1
ITOTAL OTHER FUNDS
I GRAND TOTAL
12,000
12,000
165,000
165,000
300,000
300,000
162,000
24,000
24,000
810,000
20,000
20,000
40,000
40,000
26.938
26,938
22,000
50,000
32,000
24,000
38,000
22,000
30,000
40,000
21,000
32,000
60,000
22,000
76,000
140,000
22,000
30,000
48,000
50,000
20,000
26,000
20,000
40,000
865,000
28,015
12,930
86,200
28,015
22,628
18,856
280,150
14,008
490,801
$2,429,739
$3,281,239
Major Capital Outlay only includes items over $10,000
L-1
CITY OF CARLSBAD
OUT-OF-STATE TRAVEL BUDGET 2007-08
ORG KEY DEPARTMENT TRAVEL DESCRIPTION
#OF
PEOPLE DESTINATION
07-08
ADOPTED
BUDGET
lOBMMMririMBu '•'•'• ' -^'^ '.-„-<•-"•* - '" - - ;>* *-- "•-' • ,- - ', > f^"* •
0010110
0010310
0011010
0010210
0011012
0011110
0011112
0011210
0011310
0011510
0011610
0012110
0012120-26
CITY COUNCIL
CITY TREASURER
CITY MANAGER
CITY CLERK
COMMUNICATIONS
ADMINISTRATIVE SERVICES
STRATEGIC CHANGE TEAM
CITY ATTORNEY
FINANCE
HUMAN RESOURCES
RECORDS MANAGEMENT
POLICE ADMINISTRATION
POLICE FIELD OPERATIONS
Innovation Groups Conference 2008
Legislative Meetings 2008
American Shore & Beach Preservation Assoc
Transforming Local Government
Gov. Investment Officers Association
Innovation Groups
ICMA Best Practices
Innovation Groups Board Meetings
Legislative Meetings
National League of Cities
ICMA Annual Conference
IIMC - National Conference
3CMA
National Broadcasters Assoc.
Innovation Groups - Forum Meeting (quarterly)
Innovation Groups - Transforming Local Government Conference
Washington, DC - Legislative trip
Innovation Groups - Transforming Local Gov. Conf.
IMLA Annual Conference
IMLA Mid- Year Conference
GFOA Conference
GFOA Winter Meeting
Harris Users Conference
Outcome Budgeting Goal
SHRM (Society for Human Resource Management)
Police Recruiting Event - Baker to Vegas Race
ARMA Int'l (Associaltion of Record Managers&Admimstrators)
AIIM
MER (Managing Electonic Records)
National Notary Association (NNA)
Agenda Automation Goal - Goal Related
International Association of Chiefs of Police (IACP)
FBI National Academy
3
2
1
1
1
3
3
2
2
2
2
1
2
1
1
1
1
1
1
1
1
1
1
2
1
2
1
1
1
1
1
1
1
TBD, East Coast
Washington, DC
Galvaston, TX
TBD
Las Vegas, NV
TBD, East Coast
Out of State
Out of State
Washington DC
Washington DC
Richmond, VA
Atlanta, GA
Out of state
Nevada
Western U.S.
Midwest or Western US
Washington, DC
Midwest or Western US
Nashville, TN
Washington, DC
Ft. Lauderdale, FL
Washington, D.C.
Out of State
Out of State
TBA
Las Vegas, NV
Baltimore, MD
TBD
Chicago, IL
TBD
TBD
New Orleans, LA
Quantico, VA
4,500
2,500
1,500
8,500
1,860
1,230
3,090
4,300
3.900
1,800
3,600
3,300
3,300
20,200
3,000
3,000
5,000
1,500
6,500
1,800
1,500
1,200
4,500
1,500
1,500
2,000
2,000
4,000
1,650
1,100
1,150
3,050
6,950
1,000
500
1,500
2,500
2,500
3,000
2,500
2,000
12,500
1.800
1,800
975
975
L-2
ORG KEY DEPARTMENT
CITY OF CARLSBAD
OUT-OF-STATE TRAVEL BUDGET 2007-08
TRAVEL DESCRIPTION
#OF
PEOPLE DESTINATION
IGENEBAIFUKD
07-08
ADOPTED
BUDGET
0012130 POLICE INVESTIGATIONS
0012131 POLICE VICE/NARCOTICS
0012136 POLICE VIOLENT CRIME
0012140 POLICE SUPPORT OPERATIONS
0012142 CRIME PREVENTION
Witness Interview Training
Witness Interview Training
California Homicide Investigators Association Conference
International Tiburon CAD Users Conference
Background Investigations
Law Enforcement Information Managers Conference
International Crime Prevention Officers Assoc. Conf.
0012220 FIRE DEPARTMENT - EMERGENCY OP£ National Fire Academy
Center for Disaster Preparedness
Texas A&M University
0012225 FIRE PREVENTION National Fire Academy Training Courses
0012240 FIRE - EMERGENCY PREPAREDNESS National Fire Academy (Emerg Prep Courses)
Center for Disaster Preparedness (Emerg Prep Courses)
Texas A&M University (FEMA Courses)
0013010 COMMUNITY DEVELOPMENT
0013210 PLANNING
Congress for the New Urbanism
Making Cities Livable Conference
APA Conference
0013310 GEOGRAPHIC INFO. SYSTEMS Urban & Regional Inform. System Association Annual Confer.
0013510 ECONOMIC DEVELOPMENT
0014010 LIBRARY - COLE ADMIN
0014016 COLE REFERENCE
ULI Fall Meeting
Public Library Association National Conference
Public Library Association National Conference
0014040 LIBRARY/TECHNICAL SERVICES SirsiDynix Users Conference
0014060 PROGRAMS, EXHIBITS AND GRAPHICS Public Relations Society of America Intnl. Conf
0014062 GALLERY
0014067 ARTS EDUCATION
0014070 DOVE LIBRARY ADMIN
0014544 LEO CARRILLO RANCH
0015710 ENGINEERING
0016010 PUBLIC WORKS ADMIN.
American Association of Museums Annual Conference
American Association of Museums Annual Conference
Sirsi Superconference 2008
Public Library Association National Conference
National Trust Historic Preservation Conference
AWWA National Conference
National Water Reuse Symposium
Underground Construction Technology Conference
Institute of Transportation Engineers Annual Conf.
Permits Plus Annual Conference
APWA Conference
Hansen Conference
Unknown Out of State
Unknown Out of State
2 Las Vegas, NV
3 TBD
1 Out of State
1 Out of State
1 TBD
2 Emmitsburg, MD
1 Anniston, AL
2 College Station, TX
4 Emmilsburg, MD
1 Emmitsburg, MD
1 Anniston, AL
1 College Station, TX
1 Austin, TX
1 Santa Fe, NM
2 TBD
Washington, DC
1 Las Vegas, NV
1 Minneapolis. MN
1 Minneapolis, MN
1 Detroit, Ml
1 Philadelphia, PA
Denver, CO
1 Denver. CO
1 Detroit, Ml
2 Minneapolis. MN
1 Pittsburgh, PA
1 Atlanta. GA
1 Florida
1 TBD
1 Portland, OR
1 TBD
1 San Antonio, TX
1 Reno, NV
1,000
1,000
400
400
1,500
1,500
4,200
1,000
1.800
7,000
700
700
2,000
500
1,500
4,000
2,000
2,000
1,000
500
1,000
2,500
1,700
1,500
3,200
3,000
3,000
2,000
2,000
1,700
1,700
2,100
2,100
1,150
1,150
2,100
2,100
1,625
1,625
1.400
1,400
1,400
1,400
2,080
4,200
6,280
2,000
2,000
3,000
3,000
2,400
1,700
1,200
11,300
2,500
2.000
4,500
TOTAL GENERAL FUND 137,870
L-3
CITY OF CARLSBAD
OUT-OF-STATE TRAVEL BUDGET 2007-08
ORG KEY
|Ufil£f ISH t*Ufl
1615024
1903401
5016310
5026310
5116310
5206375
5215710
6401710
OU 1 J"4 1 U,
8013620
DEPARTMENT
OJ9
LANDSCAPING DISTRICT - MEDIANS
SECTION 8 RENTAL ASSISTANCE
WATER OPERATIONS
RECYCLED WATER OPERATIONS
WASTEWATER OPERATIONS
SOLID WASTE
STORM WATER
INFORMATION TECHNOLOGY
REDEVELOPMENT AREAS
TRAVEL DESCRIPTION
• .* .
Conference - Hansen Work Mgmt. Software Program
Visual Homes Software User Group Conference
Colorado River Water Users Association
Harris Utility Billing Conference
Itron Users Conference
2008 AWWA Annual National Conference
Annual WateReuse Symposium
Tri-State Water/Sewer Seminar
2007 APWA Congress
Western Regional Backflow Conference
Hansen Work Order Software Conference
Tri-State Water/Sewer Seminar
NRC Recycling Meeting
North American Surface Water Quality Conference
Harris User Conference
Novell Brainshare
Identity Mgr Trainging
Storeserver Training
CMS Technical Training
Web Master Conference
BSNUG Conference
Hansen Conference
Project Management
Gartner Wireless Summit
Visual Homes Conference
Business Objects Enterprise (Crystal) Training
Urban Land Institute Annual Conference
#OF
PEOPLE
-
1
2
1
2
2
1
1
1
1
2
1
1
1
2
1
1
2
1
1
1
1
1
1
1
1
1
1
DESTINATION
07-08
ADOPTED
BUDGET
i • - • .. -• ,'z " T •%
Reno, NV
Washington, DC
Las Vegas, NV
St. Louis, MO
Orlando, FL
Atlanta, GA
Tampa, FL
Primm, NV
San Antonio, TX
Las Vegas, NV
Reno, NV
Primm, NV
Denver, CO
Phoenix, AZ
South Eastern US
Salt Lake City, UT
Western U.S.
Midwestern, U.S.
Western, US
Valley Forge, PA
Denver, CO
Western U.S.
Western U.S.
Texas
Washington, D.C.
Western, U.S.
Las Vegas, NV
TOTAL OTHER FUNDS
GRAND TOTAL OUT OF STATE TRAVEL
1,600
1,600
2,500
2,500
2,000
5,000
7,000
4,000
2,000
2,000
3,000
25,000
2,000
2,000
2,000
2,000
4,000
3,000
3,000
3,000
3,000
1,350
1,600
7,000
3,000
3,600
1,350
875
1,050
2,100
1,450
500
1,100
24,975
1,700
1,700
67,775
205,645
L-4
MISCELLANEOUS STATISTICAL INFORMATION 2007-08
Date of Incorporation July 16,1952
Type of City General Law
Form of Government Council/Manager
Area 42.19 sq. miles
Population 101,337
Net Assessed Valuation $20,059,893,358
Streets:
Number of Street Lights 7,372
Miles of Streets 338
Fire Protection:
Number of Stations 6
Number of Firefighters & Officers 88
Police Protection:
Number of Stations 1
Number of Sworn Police Officers 117
Water System:
Number of Customers 86,100
Number of Water Connections 27,600
Average Daily Consumption (in Millions of Gallons) 21.5
Miles of Lines and Mains 442
Sewer System:
Number of Customers 65,900
Number of Sewer Connections 22,200
Average Daily Flows (in Millions of Gallons) 6.62
Miles of Sewers 265
Recreation and Culture:
Number of Parks 31
Acres of Parks (Including Open Space) 973
Number of Pools 1
Number of Libraries 2
Number of Materials in Library Collections 380,000+
Total Number of Authorized Full-Time City Employees 711
Source: City of Carlsbad, Finance Department
L-5
ACCOUNTING SYSTEMS AND BUDGETARY CONTROL
The City's accounting system is designed around a few basic principles.
1. The City is not one single entity. It is the total of many entities, each with its separate
function and legal restrictions on the use of resources. In the private sector, a corporation
may have many "subsidiaries" which make up the parent corporation; in the public sector,
a city government may have a variety of "funds" that provide the basis for separately
recording the financial data related to a specific entity. A fund is an accounting entity with
a complete set of self-balancing accounting records. Each fund has been established
because of some restriction on the use of resources received by that fund. This report
includes the transactions of all entities over which the City Council of the City of Carlsbad
have authority (as defined by the Governmental Accounting Standards Board).
2. The City's accounting system operates on a modified accrual basis for all governmental
type funds. Governmental funds include the General, Special Revenue, Debt Service,
and Capital Projects funds. A modified accrual system is one where (a) revenues are
recognized when they are both measurable and collectable within the accounting period,
or soon enough after the end of the period to pay liabilities of the period; and
(b) expenditures, other than principal and interest on long-term debt, are recorded when
liabilities are incurred.
3. The proprietary fund types (the Enterprise funds and the Internal Service funds) use the
accrual method of accounting. Revenues are recognized in the period earned and
expenses are recognized in the period incurred.
4. Internal controls exist with the accounting system to ensure safety of assets from
misappropriation, unauthorized use or disposition, and to maintain the accuracy of
financial record keeping. These internal controls must be established consistent with the
sound management practices based on the cost/benefit of the controls imposed. The cost
of a control should not be excessive in relation to its benefit as viewed by City
management. The internal controls in existence within the City's system are sufficient to
ensure, in all material aspects, both the safety of the City's assets and the accuracy of the
financial record keeping system.
5. Budgetary control is maintained through monthly reports on all revenue and expenditure
accounts as well as special reports summarizing the financial position of the City. The
City Council has authority to control the budget through adoption of a formal budget at the
beginning of each year and by amending the budget as necessary throughout the year.
Expenditures should not exceed budgeted figures. All appropriations expire at year-end
unless specifically carried into the new fiscal year by Council actions. The Carlsbad
Municipal Code requires that the Financial Management Director prepare annually the
budget for the City Manager showing estimated revenues and expenditures.
6. Controls on the use and transfers of budget funds are outlined in the adopted budget
resolution in the appendix of this document.
L-6
1 RESOLUTION NO. 2007-154
2 A RESOLUTION OF THE CITY COUNCIL OF THE CITY
OF CARLSBAD, CALIFORNIA, ADOPTING THE FINAL
3 OPERATING BUDGET AND CAPITAL IMPROVEMENT
, PROGRAM FOR THE FISCAL YEAR 2007-08 FOR THE
CITY OF CARLSBAD AND ESTABLISHING CONTROLS
s ON CHANGES IN APPROPRIATIONS FOR THE VARIOUS
FUNDS.
6
7 WHEREAS, the City Council of the City of Carlsbad, California has reviewed the
8 proposed final Operating Budget and Capital Improvement Program for fiscal year
9 2007-08 and has held such public hearings as are necessary prior to adoption of the
10 final budgets.
11
12 WHEREAS, the Planning Commission made a finding of General Plan
13 Consistency for all projects receiving an allocation of funds for fiscal year 2007-08 on
14 May 2, 2007 pursuant to Planning Commission Resolution No. 6302.
15
NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of16
Carlsbad, California, as follows:
18 1. That the above recitations are true and correct.
19 2. That certain documents now on file in the office of the City Clerk of the
20 City of Carlsbad entitled, "City of Carlsbad, 2007-08 Preliminary Operating Budget and
21 2007-08 to Buildout Capital Improvement Program - Preliminary" as amended in
22 accordance with Exhibits 3-A through 3-C attached hereto and incorporated by
23
reference herein, is hereby adopted as the Operating and Capital Improvement Budgets
24
for the City of Carlsbad for the fiscal year.25
26 3. That the amounts reflected as estimated revenues for fiscal year 2007-08
27 as shown in Exhibits 3-A and 3-B are hereby adopted as the budgeted revenues for
28
L-7
1 2007-08.
2 4. That the amounts designated as the 2007-08 Budget request in Exhibits 3-
3 A and 3-B are hereby appropriated to the department or fund for which they are
4 designated, and such appropriation shall not be increased except as provided herein.
5 5. That total appropriations for each fund may only be increased or
6 decreased by the City Council by passage of a resolution amending the budget except
7 as provided herein.
8 6. That the following controls are hereby placed on the use and transfers of
9 budget funds:
10 A. No expenditure of funds shall be authorized unless sufficient funds
11 have been appropriated by the City Council or City Manager as described below.
12 i. The City Manager may authorize all transfers of funds from
13 account to account within any department.
14 ii. The City Manager may authorize transfers of funds between
15 departments within the same fund in an amount up to $100,000 per transfer.
16 iii. The City Manager may delegate any of the authority given to him
17 under this resolution.
18 iv. The City Manager may authorize budget adjustments involving
19 offsetting revenues and expenditures; the City Manager may authorize increases
20 in an appropriation for a specific purpose where the appropriation is offset by
21 unbudgeted revenue, which is designated for said specific purpose.
22 v. The City Manager may authorize the transfer of appropriations
23 between accounts and/or capital projects up to $1,000,000 for the costs
24 associated with the Encina Wastewater Facility (Encina) as authorized by the
25 Encina Wastewater Authority's staff and/or Board. Any increase to the total
26 appropriations for Encina's operating budget and capital program must be
27
28 L-8
1 approved by the City Council.
2 vi. The City Manager may authorize budget adjustments to increase
3 the appropriations for Workers Compensation, Risk, Self Insured Benefits and
4 Liability funds operating budget in an amount equal to the increases in costs of
5 claims expenses.
6 vii. The City Council must authorize all transfers of funds from the
7 Council's Contingency Account.
8 B. The City Manager may authorize emergency out of state travel for
9 public safety or emergency services purposes.
10 C. The City Council must authorize any increase in the number of
11 authorized permanent personnel positions above the level identified in
12 Exhibit 3-C.
13 D. The City Manager may authorize the hiring of temporary or part time
14 staff as necessary, within the limits imposed by the controls listed above.
15 7. That the legal level of budgetary control is the fund level. Budgets may
16 not legally be exceeded at the fund level without appropriate authorization by the City
17 Council.
18 8. That interest earned on grants may be appropriated during the year for the
19 purpose for which the grant was received.
20 9. That the Finance Director is authorized to transfer funds remaining in the
21 Traffic Congestion Relief Fund on June 30, 2008, to the Pavement Overlay Fund to be
22 used towards the Pavement Overlay program.
23 10. That all appropriations in the Operating Budget and in Capital
24 Improvement Program remaining unexpended at June 30, 2007, are hereby
25 appropriated to the 2007-08 fiscal year.
11. That all appropriations for outstanding encumbrances as of June 30,26
27 2007, are hereby continued into 2007-08 for such contracts or obligations.
28
L-9
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
PASSED, APPROVED AND ADOPTED at a Regular Meeting of the City Council
of the City of Carlsbad on the 26th day of June, 2007, by the following vote to wit:
AYES: Council Members Lewis, Kulchin, Hall, Packard and Nygaard.
NOES: None.
ABSENT: None.
-X** — ^
xn >7 s^ /
/I// /} /" / // //// // fl) / ./
1 M// / w r/&s1 /f[jbLJ*cfl /Jr*~ (ju&'i/J&
r CLAUDE A LEWIS, Mayor
ATTEST:
v0\V"i n *rfK irtePvi* C~^\ j^i^" \iLx-v(,kr"T\ , ^i3O» r\w\ L ui D i L XI_/T
LORRAINE M. WOOD, City Clerk ~ ' \^J
(SEAL)
C* f '••""" *"**-^]rf ^
!>S33p!i
^-^v^"I.IIll^
L-10
•1
Ml
m
m
m
m
mm
M•
^•il
M
Pi
Ml
*n
Ml
Pi
MI
flf
y
I
•|
1
m
m
n
Ml
m.
Ml
PI
to
Pi
II
m
1 RESOLUTION NO. 1300
2 A RESOLUTION OF THE BOARD OF DIRECTORS OF
CARLSBAD MUNICIPAL WATER DISTRICT (CMWD),
3 ADOPTING THE WATER DISTRICT FINAL OPERATING
, BUDGET AND CAPITAL IMPROVEMENT PROGRAM FOR
2007-08.
5 _
6
7 WHEREAS, the Board of Directors of the Carlsbad Municipal Water District,
3 California, has held such public hearings as are necessary prior to the adoption of the
9 2007-08 Operating and Capital Improvement Budgets.
10 NOW, THEREFORE, BE IT RESOLVED by the Board of Directors of the
11 Carlsbad Municipal Water District as follows:
12 1 • That the above recitations are true and correct.
13 2. That certain documents now on file in the office of the Secretary entitled "City
14 of Carlsbad, 2007-08 Operating Budget and 2007-08 to Buildout Capital Improvement
15 Program - Preliminary," as amended in accordance with Exhibit 4-A attached hereto
16 and incorporated by reference herein, is hereby adopted as the Operating and Capital
17 Improvement Budgets for the Carlsbad Municipal Water District for the Fiscal Year
18 2007-08.
19 3. That the amounts reflected as estimated revenues for Fiscal Year 2007-08
20 are hereby adopted as the budgeted revenues for 2007-08.
21 4. That the amount designated as 2007-08 Budget in Exhibit 4-B is hereby
22 appropriated to the fund for which it is designated and such appropriation shall not be
23 increased except as provided herein.
24 5. That total appropriations may only be increased or decreased by the Board
2s of Directors by passage of a resolution amending the budget except as provided herein.
26 6. That the following controls are hereby placed on the use and transfers of
27 budget funds:
28
L-11
1 A. No expenditure of funds shall be authorized unless sufficient funds have
2 been appropriated by the Water Board or Executive Manager as described below.
3 i. The Executive Manager may authorize all transfers of funds from
4 account to account within the same fund in an amount up to $100,000 per transfer.
5 ii. The Executive Manager may delegate the authority to make budget
6 transfers.
7 iii. The Executive Manager may authorize budget adjustments
8 involving offsetting revenues and expenditures; the Executive Manager may authorize
9 increases in an appropriation for a specific purpose where the appropriation is offset by
10 unbudgeted revenue which is designated for said specific purpose.
11 iv. The Executive Manager may authorize increases in purchased
12 water appropriations in an amount equal to the same percent that water sales exceed
13 the amount of the original revenue estimate.
14 B. The Board of Directors must authorize any increase in the number of
15 authorized permanent personnel positions above the level identified in the final Budget.
16 The Executive Manager may authorize the hiring of temporary or part time staff as
17 necessary, within the limits imposed by the controls listed above.
18 7. That all appropriations and outstanding encumbrances as of June 30, 2007
19 are hereby continued into 2007-08 for such contracts and obligations.
20 8. All appropriations for Capital Improvement Projects remaining unexpended
21 at June 30, 2007, are hereby appropriated for such capital projects for the 2007-08
22 fiscal year.
23 9. The Board of Directors authorizes the transfer during FY 2006-07 of
24 $2,779,974 from the Water Enterprise Fund to the Payroll Trust Fund to fund the
25 actuarially determined unfunded liability of retiree health care costs.
26
///27
28
L-12
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
PASSED, APPROVED AND ADOPTED at a Special Meeting of the Board of
Directors of the Carlsbad Municipal Water District of the City of Carlsbad on the 26th
day of June, 2007, by the following vote to wit:
AYES: Board Members Lewis, Kulchin, Hall, Packard and Nygaard.
NOES: None.
ABSENT: None.
ATTEST:
LORRAINE M. WOOD, Secretary
(SEAL)
L-13
1 RESOLUTION NO. 443
2 A RESOLUTION OF THE HOUSING AND
REDEVELOPMENT COMMISSION OF THE CITY OF
3 CARLSBAD, CALIFORNIA, APPROVING THE
OPERATING BUDGET OF THE REDEVELOPMENT
4 AGENCY AND HOUSING AUTHORITY FOR FISCAL
YEAR 2007-08.
5
6 WHEREAS, the Housing and Redevelopment Commission of the City of
Carlsbad, California (the Commission), has reviewed the operating budget for the
8 Redevelopment Agency for Fiscal Year 2007-08; and
9
WHEREAS, the Commission has reviewed the operating budget for the Housing
10
Authority Section 8 Programs, for Fiscal Year 2007-08; and
12 WHEREAS, public hearings have been held as necessary prior to the adoption of
13 the final operating budgets.
14 NOW, THEREFORE, BE IT RESOLVED by the Housing and Redevelopment
15 Commission of the City of Carlsbad, California as follows:
16 1. That the above recitations are true and correct.
2. That certain documents now on file in the office of the City Clerk of the
18 City of Carlsbad entitled "City of Carlsbad, 2007-08 Operating Budget and 2007-08 to
19
Buildout Capital Improvement Program - Preliminary," shall be and the same are hereby
20
adopted as the Operating Budgets for the Carlsbad Redevelopment Agency and
Housing Authority Section 8 Programs for the Fiscal Year 2007-08.
23 3. That the amounts reflected as estimated revenues for Fiscal Year 2007-08
24 are hereby adopted as the budgeted revenues for 2007-08.
25 4. That the amount designated as 2007-08 Budget in Exhibit 5-A is hereby
26 appropriated to the fund for which it is designated, and such appropriation shall not be
increased except as provided herein.
28
L-14
1 5. That the following controls are hereby placed on the use and transfers of
2 budget funds:
3 A. No expenditure of funds shall be authorized unless sufficient funds
4
have been appropriated by the Commission or Executive Director as described below.
5
I The Executive Director may authorize all transfers of funds
6
from account to account within the same fund in an amount up to $100,000 per transfer.
7
ii. The Executive Director may delegate the authority to make8
budget transfers and adjustments,
jo iii. The Executive Director may authorize budget adjustments
11 involving offsetting revenues and expenditures; the Executive Director is authorized to
12 increase an appropriation for a specific purpose where said appropriation is offset by
13 unbudgeted revenue which is designated for said specific purpose.
14 B. The Commission must authorize any increase in the number of
authorized permanent personnel positions above the level identified in the final Budget.
16
The Executive Director may authorize the hiring of temporary or part time staff as
17
necessary, within the limits imposed by the controls listed above.
18
6. That all appropriations and outstanding encumbrances as of June 30,
20 2007, are hereby continued into 2007-08 for such contracts and obligations.
21 7. The Commission authorizes the transfer in FY 2006-07 of $48,322 from
22 the Redevelopment Operations Fund and $5,059 from the South Coastal Carlsbad
23 Redevelopment Fund to the Payroll Trust Fund for the actuarially determined unfunded
24 liability for retiree health care costs.25 ///
26
///
27
///
28
L-15
1
2
3
4
5
6
7
8
10
11
12
15
16
17
18
19
20
21
22
23
24
25
26
27
28
PASSED, APPROVED AND ADOPTED at a Special Meeting of the Housing and
Redevelopment Commission of the City of Carlsbad on the 26th day of June, 2007, by
the following vote to wit:
AYES: Commission Members Lewis, Kulchin, Hall, Packard and Nygaard.
^-— sNOES: None. s^ . /)
/ I// /} /? •/ /
ABSENT: None. / [/// // X» /ss'
1 y/y//A//?/v tffo
/ •^L&'fj/MTJjfr- Ljf4^f_f>€^
I^CirAUDPA LEVVT&; Cltefrman
ATTEST:
i /; s
f*Z - OX—A C2S >c
f*~S RAYMOND R. PATCHETT, Secretary
(SEAL)
^««^%
/^/" 's\^\
= sJ ill
\\\ 197° /£§*, •$• *•. .•" * ^>
''/ ^RLSB^ \NV
'''iinii*^
L-16
•1
|
Ii
9
M"
Hf
Ml
Hs"-:T
m
I
^m>
|
m
i
»
yj
mFW
•1
||
li
m
1 RESOLUTION NO. 2007-155
2 A RESOLUTION OF THE CITY COUNCIL OF THE
CITY OF CARLSBAD, CALIFORNIA, ESTABLISHING
3 THE 2007-08 APPROPRIATION LIMIT AS REQUIRED
BY ARTICLE XIIIB OF THE CALIFORNIA STATE
4 CONSTITUTION AND STATE LAW
5
6 WHEREAS, Article XIIIB of the California State Constitution requires that
7 governments annually establish a limit on the appropriation of proceeds of taxes; and
8 WHEREAS, State law requires that this limit be presented to the governing body
9 of each entity each fiscal year; and
WHEREAS, State law also requires that this limit be published in a newspaper of
general circulation to allow public response to the limit as adopted.
12
NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of
13
Carlsbad, California, as follows:14
1. That the above recitations are true and correct.
16 2. That the City Council of the City of Carlsbad, California, does hereby
17 establish and adopt the 2007-08 appropriation limit of one hundred seventy-eight
18 million, six hundred and three thousand, eight hundred and ninety-seven
19 ($178,603,897) as computed in Exhibit 6-A attached hereto.
3. That the City Clerk is directed to publish this Resolution in a
21 newspaper of general circulation.
22
23
24
25
26 '"
27
28
L-17
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
PASSED, APPROVED AND ADOPTED at a Regular Meeting of the City Council
of the City of Carlsbad on the 26th day of June, 2007, by the following vote to wit:
AYES: Council Members Lewis, Kulchin, Hall, Packard and Nygaard.
NOES: None.
ABSENT: None.
OJDE A LEWIS, Mayor
ATTEST:
LORRAINE
(SEAL)
WObDTciiyCleflc
ii
i
^ & .••'''***\*£'-&\~ •*• •• * '"
i
L-18
mm
CITY OF CARLSBAD
GANN APPROPRIATIONS LIMIT
The Appropriations Limitation imposed by Proposition 4 and modified by Proposition 111
creates a restriction on the amount of revenue which can be appropriated in any fiscal year.
The revenues which are subject to the Limitation are those considered "proceeds of taxes." The
basis for calculating the Limit began in fiscal year 1978-79 and is increased based on population
growth and inflation.
The major change made by Proposition 111 allows the City to annually choose among the
following options for calculating its Gann Limit:
> Population growth of Carlsbad, OR
> Population growth within San Diego County, AND
> Growth in California per capita income, OR
> Growth in non-residential assessed valuation due to new construction in the City.
The factors used to calculate the 2007-08 Limit were:
> Population growth in Carlsbad, AND
> Growth in California per capita income
The formula is outlined below:
2006-07 Expenditure Limit $166.499.391
% Carlsbad Population Growth 1.0273
Growth in California per capita income X 1.0442
Net Increase Factor 1.0727
2007-08 Limit (2006-07 Limit X Factor) $178.603.897
Current Appropriation of Proceeds of Taxes $105,645,546
(Subject to the Limit)
The spending limit for the City of Carlsbad for 2007-08 is $178.6 million, with appropriations of
"proceeds of taxes" of $105.6 million. The result of the calculation provides the City with an
operating margin of $73 million.
L-18a
RESOLUTION NO. 2007-156
2 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF
CARLSBAD, CALIFORNIA, ADOPTING CHANGES TO THE
3 MASTER FEE SCHEDULE.
4
5 WHEREAS, the City Council of the City of Carlsbad has the authority to establish
6 fees for City services; and
7 WHEREAS, from time-to-time said fees are reviewed and evaluated to maintain
8 an adequate fee structure recovering costs for City services; and
9
WHEREAS, the City Council has determined the cost of providing general and
10 development-related services; and
11
WHEREAS, the City Council finds it necessary to recover the costs for City
12
services; and13
14 WHEREAS, the City Council has held the necessary public hearing and allowed for
j5 public comment on the establishment of said fees.
16 NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of
17 Carlsbad, California, as follows:
18 1. That the above recitations are true and correct.
19 2. That the changes to the Master Fee Schedule for the fees shown in
20 Exhibit 7-A attached hereto, are hereby adopted.
21
3. That all other general City fees and development-related fees as shown in
Resolution 2006-171, except as specifically amended, shall remain in full force and
24 effect.
25 4. This resolution shall become effective on August 1, 2007 for General city
26 fees and September 1,2007 for the Development-related fees.
27 ///
28
L-19
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
PASSED, APPROVED AND ADOPTED at a Regular Meeting of the City Council
of the City of Carlsbad on the 26th day of June, 2007, by the following vote to wit:
AYES: Council Members Lewis, Kulchin, Hall, Packard and Nygaard.
NOES: None.
ABSENT: None.
/T/7 /j >
ft/Myf ////;
[^M/WX&lA'
CCLAUDE A LEWIS,
ATTEST:
V^LDfl^nJ
^^S //
1 £^
Lefc**Mayor
Cob(^^Sk^^i <
LORRAINE M. WOOD, City Clent ' SJ
(SEAL) ^
&~ <c ••'
i\»t""///.
^SB40 V
^!l^b\
'^^HSf'^i"<,*„>*
L-20
RESOLUTION NO. 2007-157
2
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF
3 CARLSBAD, CALIFORNIA, APPROVING THE 2007-08
, FISCAL YEAR OPERATING AND CAPITAL BUDGETS OF
THE ENCINA WASTEWATER AUTHORITY
5
6 WHEREAS, the City of Carlsbad is a member agency to the Encina Joint Powers
7 Agreement entered into on July 13,1961, for the acquisition, construction, ownership,
8 operation and maintenance of the Encina Joint Sewer System; and
9 II WHEREAS, the Encina Agreement requires approval for the budget of the
10
Encina Wastewater Authority (EWA) by the Member Agencies following the
11
recommendation of the Joint Advisory Committee (JAC); and
12
WHEREAS, the City Council of the City of Carlsbad desires to approve said
. budget and provide for the payment of its share such expenses in accordance with the
15 allocation provided in the Basic Agreement; and
16 WHEREAS, there are projected to be sufficient funds in the Sanitation fund for
17 the payments as they become due.
18 NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of
Carlsbad, California, as follows:
20 1. That the above recitations are true and correct.
21
2. That the City of Carlsbad's share of the Fiscal Year 2007-08 Operating22
Budget of the EWA as approved by JAC on May 23, 2007, in the amount of $3,432,679
24 for Wastewater Operations and $640,649 for the Carlsbad Water Recycling Facility
25 I Operations, and the Capital Budget of $2,343,384 is hereby approved.
26
27
28 ii
L-21
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
PASSED, APPROVED AND ADOPTED at a Regular Meeting of the City Council
of the City of Carlsbad on the 26th day of June, 2007, by the following vote to wit:
AYES: Council Members Lewis, Kulchin, Hall, Packard and Nygaard.
NOES: None.
ABSENT: None.
\\JDE A LEWIS, Mayor
ATTEST:
tORRAINE M. WOOD, City Cleft
(SEAL
L-22
1 RESOLUTION NO. 1301
2 A RESOLUTION OF THE BOARD OF DIRECTORS OF
CARLSBAD MUNICIPAL WATER DISTRICT (CMWD), TO
3 SET A PUBLIC HEARING REGARDING PROPOSED
4 INCREASES IN WATER RATES.
5 WHEREAS, the California Supreme Court recently made a ruling that local
6
governments must hold a public majority-protest hearing, and notify customers forty-five
7
(45) days in advance of increases in water rates; and8
9 WHEREAS, the Carlsbad Municipal Water District is proposing water rate
!0 increases in November 2007; and
11 WHEREAS, a public hearing must be held regarding the increase in water rates.
12 NOW, THEREFORE, BE IT RESOLVED by the Board of Directors of the
13 Carlsbad Municipal Water District, as follows:
14 1. That the above recitations are true and correct.
15
2. That the Board of Directors of the Carlsbad Municipal Water District sets a
16
majority protest public hearing for Tuesday, September 11, 2007, in
accordance with law on these proposed rate increases.lo
19
20
21
22
23
24
25
26
27
28 „
L-23
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
PASSED, APPROVED AND ADOPTED at a Special Meeting of the Board of
Directors of the Carlsbad Municipal Water District of the City of Carlsbad on the 26th
day of June, 2007, by the following vote to wit:
AYES: Board Members Lewis, Kulchin, Hall, Packard and Nygaard.
NOES: None.
ABSENT: None.
ATTEST:
LORRAINE M. WOOD, Secretary
(SEAL)
L-24
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
RESOLUTION NO. 2007-158
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF
CARLSBAD, CALIFORNIA, TO SET A PUBLIC HEARING
REGARDING PROPOSED INCREASES IN SEWER AND
TRASH RATES.
WHEREAS, the California Supreme Court recently made a ruling that local
governments must hold a public majority-protest hearing, and notify customers forty-five
(45) days in advance of increases in sewer and trash rates; and
WHEREAS, the City of Carlsbad is proposing increased sewer and trash rates in
November 2007; and
WHEREAS, a public hearing must be held regarding the increase in sewer and
trash rates.
NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of
Carlsbad, California, as follows:
1 . That the above recitations are true and correct.
2. That the City Council of the City of Carlsbad sets a majority protest public
hearing for September 1 1 , 2007, in accordance with law on these proposed
rate increases.
//
//
//
„
L-25
Hi
m
m
m
I
1•
•
m
Ml
M.
y
m
Mi
Pi
•n
m
Ml
m
m
m
m
m
Ml
1
Mt
**
Ml
Ml
m
m
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
PASSED, APPROVED AND ADOPTED at a Regular Meeting of the City Council
of the City of Carlsbad on the 26th day of June, 2007, by the following vote to wit:
AYES: Council Members Lewis, Kulchin, Hall, Packard and Nygaard.
NOES: None.
ABSENT: None.
ATTEST:
(T)gp<xfc
LORRAINE M. WOODrclty Clerk
(SEAL)
L-26
1 RESOLUTION NO. 2007-159
2 A RESOLUTION OF THE CITY COUNCIL OF THE
CITY OF CARLSBAD, CALIFORNIA, APPROVING
3 ADJUSTMENTS TO THE FY 2006-07 OPERATING
4 BUDGET
WHEREAS, the Self-Insured Benefits Fund will not have sufficient budget
6
appropriation to cover the anticipated dental claim expenses for the Fiscal Year 2006-
7
2007; and8
g WHEREAS, the Finance Department has prepared the cash flow analysis for
10 the Self-Insured Benefits Fund and recommends the additional appropriation of $95,500
11 to cover the anticipated deficit; and
12 NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of
13 Carlsbad, California, as follows:
14 1. That the above recitations are true and correct.
2. That the City Council of the City of Carlsbad, California, does hereby
16
authorize an additional appropriation of $95,500 in Fiscal Year 2006-07 for the
17
Self Insured Benefits Fund (Dental).
18
3. That the City Council of the City of Carlsbad, California, does hereby
90 authorize the transfers, attached hereto as Exhibit 12A in FY 2006-07 for the
21 estimated actuarially determined retiree health care liability. The various
22 amounts for each fund listed will be transferred to the Payroll Trust Fund.
23 ///
24 ///
25 ///
26
///
27
///
28
L-27
1
2
3
4
5
6
7
8
9
10i \j
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
PASSED, APPROVED AND ADOPTED at a Regular Meeting of the City Council
of the City of Carlsbad on the 26th day of June, 2007, by the following vote to wit:
AYES: Council Members Lewis, Kulchin, Hall, Packard and Nygaard.
NOES: None.
ABSENT: None.
/y?fl/A«
1 J(M(4I&JAUDE A
ATTEST:
\ \_ ^\^\|n o L
CORRATNE
(SEAL)
L-28
^~\
/)£ ////Jj /*/-MJwt>4*
IgWS.faiyoT
C"\ (^ Tj /^ Ovj ^ (i ^^\ i\J(\ <^r\ v v OvM/lrv\ u. ift OfijL
M. WOOD, City Clerk > FJ
^"'""//.
$&***.&C OV* v> S*'te> 'C "^
= O :^^^^^K: O =
"^^m^jK/^j
S *••••••"* v
GLOSSARY
Appropriation - A specific amount of money authorized by the City Council for an approved work
program or individual project.
Assessed Valuation - A dollar value placed on real estate or other property by San Diego
County as a basis for levying property taxes.
Balanced Budget - A budget in which planned expenditures do not exceed planned funds
available.
Beginning/Ending Fund Balance - Unencumbered resources available in a fund from the
prior/current year after payment of the prior/current year expenses.
Bond - A certificate of debt issued by an entity, guaranteeing payment of the original investment,
plus interest, by a specified future date.
Budget - An annual financial plan that identifies revenues, types and levels of services to be
provided, and the amount of funds that can be spent. Carlsbad's Operating Budget
encompasses one fiscal year, as does the Capital Improvement Program appropriation.
Capital Improvement Program - A multi-year financial plan containing proposed construction of
physical assets such as park, street, sewerage, and recreation facilities. This program has
identified all projects which are the responsibility of the City between the present to buildout.
Capital Outlay - Equipment (fixed assets) with a value $1,000 or more and an estimated useful
life of more than one year, such as automobiles and office furniture, which appear in the
Operating budget.
Cost Allocation - A method used to charge General fund overhead costs to other funds, such as
Enterprise funds and Internal Service funds.
Debt Service - The payment of principal and interest on borrowed funds such as bonds.
Department - An organizational unit comprised of programs or divisions. Examples include the
Police Department, Library Department, and Human Resources Department.
Encumbrance - A legal obligation to pay funds, an expenditure of which has not yet occurred.
Enterprise Fund - A fund type established to account for the total costs of selected
governmental facilities and services that are operated similar to private enterprises. These
programs are entirely self-supported, and include the Water and Sanitation Departments.
Expenditure - The actual spending of funds set aside by appropriation for identified goods and
services.
Fee - A general term used for any charge levied by government for providing a service or
permitting an activity.
Fiscal Year - A twelve-month period of time designated as the budget year. Carlsbad's fiscal
year is from July 1 to June 30.
L-29
Fund - A set of interrelated accounts to record revenues and expenditures associated with a
specific purpose.
Fund Balance - The amount of financial resources available for use.
General Fund - The primary fund used by the City for which revenues and expenditures are not
legally restricted for use. Examples of departments operating within the General fund include
Fire, Library, and the City Manager's Office.
Grant - Contributions of cash or other assets from another governmental agency to be used or
expended for a specified purpose, activity, or facility.
Growth Management Plan - A comprehensive approach to land-use planning ensuring
controlled and managed growth within the City, while providing designated public facilities.
Growth Management Standards - Standards for acceptable service levels that have been
established for eleven public facility categories.
Interfund Transfers - Payments from one fund to another fund, primarily for work or services
provided.
Internal Service Fund - A fund that provides services to all City departments, and bills the
various other funds for services rendered. Examples of Internal Service funds include Fleet
Maintenance, Information Systems, and Workers' Compensation Insurance.
Maintenance and Operation - A general category used for classifying expenditures for materials,
supplies, and services that are normally used within the fiscal year.
Operating Budget - The annual appropriation of funds for ongoing program costs, which include
salaries, benefits, maintenance, operation, and capital outlay items.
Operating Costs - Estimated expenses that can be expected to occur following the construction
of a Capital Improvement Project.
Personnel - Costs associated with providing the staff necessary to provide the desired levels of
services. Included are both salary and benefit costs.
Revenues - Amount of funds received from the collection of taxes, fees, permits, licenses,
interest, and grants during the fiscal year.
Special Revenue Funds - A fund that collects revenues that are restricted by the City, State, or
federal government as the method by which they may be spent.
L-30
INDEX
About the City of Carlsbad, iii
Accounting Systems and Budgetary Control, L-6
Administrative Services Summary, D-1
Adult Learning Program, G-12
Arts Office, G-14
Arts Special Events, G-17
Asset Forfeiture - Various, E-17
B
Budget Awards, A-24
Budget Highlights, A-4
Budget Process, A-4
Budget Summary, A-20
Buena Vista Channel Maintenance, H-22
Building Inspection, F-9
Calendar, A-23
Canine, E-8
Capital Improvement Program Overview, 1-1
Capital Improvement Projects 2006-07, J-1
Capital Outlay Items, L-1
Capital Projects, I-3
Capital Projects through Buildout, I-6
Carlsbad City Library, G-5
Cash Management, C-5
Centra de Informacion, G-8
Cole Library, G-3
CIP Budget Expenditure Schedule, 1-15
CIP Fund Summary, K-1
CIP Projected Fund Balances, 1-12,13
CIP Revenue Estimates, 1-14
CIP Summary, 1-11
City Attorney, C-10
City Clerk, C-4
City Council, C-2
City Manager, C-7
City Manager's Transmittal Letter, A-1
Collection Development & Acquisitions, G-10
Communication, C-9
Communications Center, E-16
Community Development Administration, F-2
Community Development Block Grant, F-13
Community Development Summary, F-1
Community - Oriented Policing, E-18
Community Services - Police, E-6
Community Services Summary, G-1
Council's Five-Year Vision Statement, ii
Cultural Arts Summary, G-13
Debt Management Issues, A-18
Disaster Preparedness, E-25
Dove Library, see Carlsbad City Library
Economic Development, F-8
Economic Profile, A-5
Emergency Operations, E-22
Engineering, H-4
Environmental Programs, H-33
Expenditure Schedule, B-25
Facilities Maintenance, H-14
Family Services, E-13
Field Evidence, E-9
Field Operations, E-5
Finance, D-3
Fire Administration, E-21
Fire Department Summary, E-19
Fire Prevention, E-23
Fund Balances, B-16,1-12
Future Growth & Development, I-8
Gann Appropriations Limit, L-18a
Genealogy/Local History, G-7
General Fund, A-10, B-1
General Services Summary, H-8
Geographic Information System, F-6
Glossary - Capital Projects, K-15
Glossary, L-30
Growth Projections, I-8
Growth Management Plan, 1-11
H
Highlights, A-3
Housing, F-11
Housing and Redevelopment Summary, F-10
Housing - HUD Section 8, F-12
Housing Trust Fund Administration, F-11
Human Resources, D-5
1I
II
|SF
m
INDEX
I
Information Technology, D-11
Investigations, E-9
Land Use Planning, F-4
Library Summary, G-3
Lighting & Landscape District No. 2, H-23
Low/Moderate Income Housing - Village, F-17
Low/Moderate Income Housing - S. Carlsbad
Coastal ,F-19
M
Maintenance & Operations Summary, H-27
Media Services, G-11
Median Maintenance, H-20
Miscellaneous Non-Departmental, D-13
Operating Budget Overview, B-1
Operating Expenditures, B-25
Organization Chart, iv
Other Funds, B-5
Park Maintenance, H-11
Park Planning & Recreation Mgt., G-20
Personnel Allocations, A-21
Police Administration, E-4
Police Summary, E-2
Policy & Leadership Summary, C-1
Project Evaluation, I-2
Property and Evidence, E-12
Public Safety Summary, E-1
Public Works Administration, H-2
Public Works Summary, H-1
Readers Guide to the Budget, i
Records Management, D-7
Recreation - Agua Hedionda Lagoon, G-27
Recreation - Aquatics, G-24
Recreation Fee Supported, G-22
Recreation Operations, G-28
Recreation Summary, G-18
Redevelopment Operations - Village Area, F-15
Redevelopment Operations - S. Carlsbad Coastal
Area, F-18
Resolutions, L-7
Revenues - Capital Projects, I-9
Revenue Estimates, B-18
Revenue Projections - General Fund, A-12, B-18
Revenue Projections - Operating, A-11,6-18
Risk Management, D-9
School Resource Officers, E-11
Self-Insured Benefits, D-10
Senior Programs, G-30
Sister City, G-16
Solid Waste Management, H-34
Special Events - Cultural Arts, G-17
Staffing, A-21
Statistical Information, L-5
Strategic Goals, A-4
Street Lighting, H-21
Street Maintenance, H-16
Street Tree Maintenance, H-19
Summary, A-20
Support Operations - Police, E-15
Storm Water Protection, H-36
Task Force, E-14
Technical Services - Library, G-9
Traffic Signals, H-18
Trails, H-13
Travel, L-2
Vehicle Maintenance, H-24
Vehicle Replacement, H-26
Vice/Narcotics, E-10
w
Wastewater Operations, H-31
Water Operations, H-29
Weed Abatement, E-24
Worker's Compensation, D-8
Youth/School Programs, E-11