HomeMy WebLinkAbout; ; 2007 - 2008 Technical Appendix; 2008-01-01City or aris Calif orniaa C apital Improvement Pro ram T COPY ecnnical Appendix 2007-2008 to Buildout INTRODUCTION The purpose of this Technical Appendix is to provide a brief description of the project scope, location and need for those projects approved in the City of Carlsbad 2007-08 Capital Improvement Program (CIP) Budget. Also included at the beginning of each project category is a funding matrix which identifies the proposed funding source(s), funding amounts and timing for each of the approved CIP projects included with the respective category. All projects with any current or future funding are listed. Most of the cost estimates included in this appendix are preliminary as detailed designs have not been completed. All costs are in current dollars, therefore, projects in future years should be anticipated to escalate over time to account for inflation. TABLE OF CONTENTS CIVIC PROJECTS Administrative Facility Projects Funding Matrix for Administrative Facility Projects 1 City Administration Training Facility 2 Civic Center 3 Public Works Center 4 Police and Fire Facility Projects Funding Matrix for Police and Fire Facility Projects 5 Fire Station No. 3 (Relocation) 6 Fire Station No. 5 Storage Building/Restrooms 7 Fire Station No. 6 (Permanent) 8 Police CAD Implementation 9 Public Safety Training Facility 10 Library Facility Projects Funding Matrix for Library Facility Projects 11 Cole Library Expansion 12 Carlsbad Library Learning Center 13 Miscellaneous Projects Funding Matrix for Miscellaneous Projects 14 Bicycle Master Plan 15 Community Facilities District #1 Administration 16 Coastal Rail Trail 17 Opportunistic Sand Program 18 Pedestrian Master Plan 19 Proposition "C" Projects 20 Public Works Inventory and Facilities Management Program 21 Village Public Parking Enhancement Program 22 Village Streetscape Improvements 23 FACILITY MAINTENANCE PROJECTS Facility Maintenance Projects Funding Matrix for Facility Maintenance Projects 24 Beach Access Repair/Upgrades 25 Cole Library HVAC Replacement 26 Holiday Park Restroom Improvements 27 Laguna Riviera Park Restroom Replacement 28 Repair/Recoat Guardrail Palomar Airport Bridge at Carlsbad Boulevard 29 Senior Center Courtyard Renovation 30 Stagecoach Park Picnic Shelter 31 Stagecoach Park Synthetic Turf Fields 32 PARKS PROJECTS Citvwide Parks Projects Funding Matrix for Citywide Parks Projects 33 Business Park Recreational Facility 34 Carlsbad Municipal Golf Course 35 Lake Calavera Trails Master Plan 36 Senior Center Expansion 1st Floor 37 Senior Center Expansion 2nd Floor 38 Veteran's Memorial Park 39 Northwest Quadrant Parks Projects Funding Matrix for Northwest Quadrant Parks Projects 40 Pine Avenue Park-Phase 1 41 Pine Avenue Park - Phase II (Community Building) 42 Northeast Quadrant Parks Projects Funding Matrix for Northeast Quadrant Parks Projects 43 Hidden Canyon Park 44 Park Site Acquisition 45 Park Site Development 46 PARKS PROJECTS (Continued) Southwest Quadrant Parks Projects Funding Matrix for Southwest Quadrant Parks Projects 47 Aviara Community Park - Phase 1 48 Aviara Community Park - Phase II (Community Building) 49 Aviara Reimbursement Agreement 50 Poinsettia Park Phase II - Parking Expansion 51 Poinsettia Community Park - Phase II 52 Southeast Quadrant Parks Projects Funding Matrix for Southeast Parks Projects 53 Alga Norte Park- Phase 1 54 Alga Norte Park Phase II (Aquatics Center) 55 Carrillo Ranch Phase III Barn/Theater 56 Carrillo Ranch Event Area Expansion 57 Carrillo Ranch Erosion Repair 58 Leo Carrillo Park - Phase III 59 DRAINAGE PROJECTS Drainage Projects Funding Matrix for Drainage Projects 60 Agua Hedionda Channel Improvements 61 Calle Gavanzo Subsurface Drainage Improvement 62 Carlsbad Boulevard Storm Drain Replacement 63 CMP Replacement Program 64 College Boulevard Bridge Facility 65 College Boulevard/Cannon Road (Drainage Basin BJB) 66 College Boulevard/Cannon Road (Calavera Creek Channel and Drainage Basin BJ) 67 Cynthia Lane Storm Drain 68 Faraday/Melrose Drainage Facilities 69 Highland Drive Between Pine Avenue and Basswood Avenue 70 Kelly Drive Channel Repair 71 La Costa Avenue Storm Drain Replacements 72 Master Drainage Plan Update 73 Miscellaneous Master Drainage Facilities 74 Miscellaneous Road Subdrains 75 NW Quadrant Storm Drain Improvement Program 76 Park Drive and Tamarack Avenue Storm Drain 77 Ridgecrest Drainage Improvement 78 Romeria Street Drainage Improvement 79 Tamarack and El Camino Real Storm Drain and Siltation Basin 80 SEWER PROJECTS Encina Water Pollution Control Facility Projects Funding Matrix for Encina Water Pollution Control Facility Projects 81 Building Improvements 82 Capital Acquisitions Replacement/Rehabilitation 83 Phase IV Expansion Debt Service 84 Phase V Expansion 85 Sewer Collection System Projects Funding Matrix for Sewer Collection System Projects 86 Avenida Encinas Gravity Sewer 87 Buena Interceptor Sewer Improvements 88 Buena Vista Lift Station Force Main (VC-4) 89 Carlsbad Trunk Sewer Reaches VCT1A, VCT1B, VCT1C 90 Demolition of Calavera Hills Treatment Plant 91 Forest Gravity Sewer 92 Home Plant Lift Station 93 La Costa Meadows Sewer Extension 94 LaGolondrina Sewer Extension 95 North Agua Hedionda Interceptor Rehabilitation- East Segment El Camino Real to Kelly Drive 96 North Agua Hedionda Interceptor Rehabilitation - West Segment Cove Drive to Hoover Street 97 North Agua Hedionda Trunk Sewer Reach NAHT1A 98 North Batiquitos Interceptor Rehabilitation 99 North Batiquitos Sewage Lift Station Modifications 100 Poinsettia Sewage Lift Station Odor and Noise Abatement 101 Sewer Lift Station Removals 102 Sewer Lift Station - Miscellaneous Repairs & Upgrades 103 Sewer Line Refurbishment / Replacement 104 Master Plan / Connection Fee Update 105 Sewer Monitoring Program 106 South Agua Hedionda Lift Station and Force Main 107 Terramar Lift Station Emergency Generator 108 Vista/Carlsbad Interceptor Agua Hedionda Lift Station (VC 12) 109 Vista/Carlsbad Interceptor Sewer Reach VC11B 110 Vista/Carlsbad Interceptor Sewer Reaches VC13 to VC15 111 Vista/Carlsbad Interceptor Sewer Rehabilitation Reaches 1 thru 3 112 IV WATER PROJECTS Water Distribution System Projects Funding Matrix for Water Distribution System Projects 113-114 "D" Reservoir - Black Rail Road Improvements 115 "D" Reservoir - Phase II 116 Aviara Parkway 117 Calavera Hills Water Booster Station Standby Generator 118 Cannon Road East of El Camino Real 119 Carlsbad Boulevard South of Avenida Encinas 120 Cathodic Protection Program 121 College Boulevard - Cannon Road to Badger Lane 122 College Boulevard (ECR to Cannon Road) 123 College Boulevard Maerkle Reservoir to Agua Hedionda Creek 124 Crestview Drive Transmission Main 125 Demolition of Water Facilities at Pajama Drive 126 Desalination Groundwater/Seawater Study 127 El Camino Real (Palomar Airport Road South) 128 El Camino Real Between College & Jackspar 129 El Camino Real Crossing at Kelly Drive 130 El Camino Real Transmission Main from Faraday Avenue to Cougar Drive 131 El Camino Real / Carlsbad Village Drive Water Pipeline Replacement 132 El Fuerte (North of Loker) 133 El Fuerte (Alga Road to Poinsettia Lane) 134 El Fuerte (Poinsettia Lane to Palomar Airport Road) 135 El Fuerte and Corintia Street 136 Ellery Water Pump Project 137 Faraday Avenue Extension 138 Foussat Road Well Abandonment 139 Lake Calavera Reservoir Improvements 140 Maerkle Dam Floating Cover 141 Maerkle Pump Station 142 Maerkle Reservoir Bridge Replacement 143 Maerkle Reservoir Storage (TAP #2) 144 Marron Road (Pressure Regulating Station to Oceanside) 145 Master Plan Update 146 Melrose Drive / Palomar Airport Road to Faraday 147 Miscellaneous Pipeline Replacements 148 Miscellaneous Water Reservoir Fencing 149 Water Distribution System Projects (Continued) Oceanside Intertie Upgrade 150 Palomar Airport Road/El Camino Real Pump Station 151 Poinsettia Lane (El Camino Real to Skimmer Court) 152 Poinsettia Lane (Skimmer Court to Cassia Road) 153 Poinsettia Lane East of Black Rail Road 154 Pressure Reducing Station - Sycamore Creek 155 Rancho Carrillo Oversizing / Extension 156 San Marcos Blvd. Pipeline Replacement Palomar Airport Road West of San Diego County Water Authority (SDCWA) 157 Tanglewood Pressure Reducing Station Replacement 158 Water System Intertie Connection 159 Recycled Water Projects Funding Matrix for Recycled Water Projects 160 Chestnut Avenue Recycled Water Line 161 El Camino Real and Tamarack RW Pump Station 162 I-5 Recycled Water Transmission Line 163 Pump Station Removal 164 Recycled Water Phase II - Facility 165 Recycled Water Phase II - Flow Equalization 166 Recycled Water Phase II - Mahr Reservoir Improvements 167 Recycled Water Phase II - Pipelines 168 Recycled Water Phase II - Pump Stations 169 CIRCULATION SYSTEM PROJECTS Traffic Signal Projects Funding Matrix for Traffic Signal Projects - Sheet 1 170 Alga Road and Cazadero Drive 171 Aviara Parkway (Poinsettia Lane to El Camino Real) 172 Aviara Parkway and Camino De Las Ondas 173 Calle Barcelona and Paseo Avellano 174 Camino De Los Coches and La Costa Avenue 175 Camino Vida Roble and Yarrow Drive 176 Cannon Road and Avenida Encinas 177 Cannon Road and College Boulevard 178 Carlsbad Boulevard and Tamarack Avenue Signal Repairs 179 Carlsbad Village Drive and Glasgow Drive 180 College Boulevard and Carlsbad Village Drive 181 vi Traffic Signal Projects (Continued) El Camino Real / Plaza Drive / Marron Road / Hosp Way 182 El Camino Real and Chestnut Avenue Signal Repairs 183 El Camino Real and Tamarack Avenue Signal Repairs 184 El Fuerteand Rancho Pancho 185 Faraday Avenue and Camino Hills Drive 186 Faraday Avenue and Orion Street 187 Faraday Avenue and Priestly Drive 188 Faraday Avenue and Rutherford Road 189 La Costa Avenue and Esfera Street 190 La Costa Avenue and Levante Street 191 La Costa Avenue and Nueva Castilla Way 192 Melrose Drive and La Costa Avenue 193 Monroe Street and Hosp Way 194 Palomar Airport Road and Melrose Drive 195 Poinsettia Lane and Black Rail Road 196 Poinsettia Lane and Brigantine Road 197 Poinsettia Lane and El Fuerte Street 198 Rancho Santa Fe Road and Calle Junipero (Formerly Melrose Drive South) 199 Rancho Santa Fe Road and Avenida La Cima 200 Rancho Santa Fe Road and San Elijo Road (Formerly Questhaven Road) 201 Tamarack Avenue and Pontiac Drive 202 Tamarack Avenue and Valley Street 203 Clary Battery Back-Up System/Red LED Replacement 204 Video Detection Conversion 205 Street Projects Funding Matrix for Street Projects 206-207 Avenida Encinas Widening South of Palomar Airport Road 208 Bridge Preventive Maintenance Plan 209 B&TD#2 Poinsettia Lane Reach "E" (Cassia Road to Skimmer Court) 210 Bridge and Thoroughfare District No. 2 Poinsettia Lane Reaches A, B, C, F, G & Aviara Parkway Reimbursement 211 B&TD#3 - Cannon Road West Frost Avenue to Faraday Avenue (Reimbursement) 212 Cannon Road Reach 4B - College Boulevard to Oceanside 213 Carlsbad Boulevard Bridge Over Power Plant Discharge Channel 214 Carlsbad Boulevard Bridge Over Railroad Concrete Barrier 215 Carlsbad Boulevard and State Street Pedestrian and Intersection Enhancement Design 216 Carlsbad Boulevard Encinas Creek Bridge Replacement 217 vii Street Projects (Continued) Carlsbad Boulevard Median Tamarack Avenue to Pine Avenue 218 Carlsbad Boulevard Bridge Retrofit Over San Diego Northern Railroad 219 Carlsbad Boulevard Widening - Cannon Road to Manzano Drive 220 Carlsbad Village Drive and Avenida De Anita 221 Carlsbad Village Drive Widening 222 College Boulevard Reach A and Cannon Road Reach 4A 223 College Boulevard / Cannon Road Reach 3 Assessment District 224 Concrete Replacement 225 El Camino Real and Carlsbad Village Drive 226 El Camino Real and Faraday Avenue 227 El Camino Real at Aviara Parkway/Alga Road 228 El Camino Real Medians 229 El Camino Real Widening La Costa Avenue to Arenal Road 230 El Camino Real Widening - Lisa Street to Crestview Drive 231 El Camino Real Widening - North of Cougar Drive 232 El Camino Real Widening Tamarack Avenue to Chestnut Avenue 233 Faraday Avenue / Melrose Drive Extensions 234 Interstate 5 and La Costa Avenue Auxiliary Lanes 235 Marbella Wall Beautification 236 Melrose Drive and Alga Road 237 Palomar Airport Road and College Boulevard 238 Palomar Airport Road and Melrose Avenue Right-Turn Lane 239 Palomar Airport Road Widening at Paseo Del Norte 240 Park Drive, Marina Drive to Cove Drive 241 Pavement Management Program 242 Pavement Management Concrete Repairs 243 Poinsettia Lane East of El Camino Real Financing Program 244 Poinsettia Lane Widening (Paseo Del Norte to Batiquitos Lane) 245 Rancho Santa Fe Road and Olivenhain Road Improvements 246 Rancho Santa Fe Road North Phase I 247 Rancho Santa Fe Road North Phase II 248 Rancho Santa Fe Road South (To Encinitas) 249 San Marcos Boulevard Widening Project 250 Sidewalk / Street Construction Program 251 Tamarack Avenue and Adams Street Intersection Improvement 252 Traffic Monitoring Program 253 Underground District No. 17 (Roosevelt Street) 254 Valley Street and Magnolia Avenue Sidewalks 255 viii CIVIC PROJECTS ADMINISTRATIVE FACILITY PROJECTS FUNDING MATRIX FOR ADMINISTRATIVE FACILITIES PROJECTS PROJ NO. 4000 3572 3572 3655 FUND NO. 40001 35721 35722 36551 PROJECT TITLE CITY ADMIN TRAINING FACILITY (PRE-DESIGN) - PROP C CIVIC CENTER PUBLIC WORKS CENTER PUBLIC WORKS CENTER PUBLIC WORKS CENTER FUNDING SOURCE GCC CFD»1 CFD#1 WATER REPL SEWER REPL TOTAL BUDGET 100,000 26,063,010 16,594,319 6,927,118 3,730,640 FUTURE YEAR BUDGET AMOUNTS YEAR1 2007-08 YEAR 2 2008-2009 100,000 YEAR 3 2009-2010 13,886,053 6,927,118 3,730,640 YEAR 4 2010-2011 YEARS 2011-2012 26,063,010 YEAR 6-10 2012-2017 BUILDOUT 2017-2022 Page 1 CAPITAL PROJECT DESCRIPTION ADMINISTRATIVE FACILITIES - CITY ADMINISTRATION TRAINING FACILITY PROJECT NAME 4000 PROJECT NO. PROJECT LOCATION MAP: PROJECT SITE PROJECT LOCATION: At either the Carlsbad Safety Center or the Carlsbad Municipal Water District building. PROJECT DESCRIPTION: Prepare design plans and specifications for a citywide training facility. When not in use by City personnel, facility would be available for professional development courses, computer training, and/or provide educational conference and meeting facility space for public and private sector organizations and educational institutions. PROJECT NEED: Facility would provide facilities and services for employee development activities sponsored by the City for its employees. FINANCING: Purpose Pre-Design Total Cost = Estimated Cost $100,000 $100,000 Funding Source GCC TRAININGFACILITY Page 2 CAPITAL PROJECT DESCRIPTION ADMINISTRATIVE FACILITIES - CIVIC CENTER PROJECT NAME NONE PROJECT NO. PROJECT LOCATION MAP: PROJECT 'SITE PROJECT LOCATION: El Camino Real and Faraday Avenue. PROJECT DESCRIPTION: Redesign the existing 128,000 square foot "Farmers Building" at the intersection of El Camino Real and Faraday Avenue as a future City Hall and Council Chambers complex. Project will consolidate all administrative operations and facilities in one location for organizational and operational efficiency. Include 1% for public art. PROJECT NEED: Required to meet Growth Management Standards. FINANCING: Estimated Cost $26,063,010 $26,063,010 Purpose Design/Construction Total Cost = Funding Source CFD#1 CITYHALL Page 3 CAPITAL PROJECT DESCRIPTION ADMINISTRATIVE FACILITIES - PUBLIC WORKS CENTER PROJECT NAME 3572 & 3655 PROJECT NO. PROJECT LOCATION MAP: PROJECT SITE PROJECT LOCATION: Phase II of Safety & Service Center, Orion Way. PROJECT DESCRIPTION: Construction of the Public Works Center and associated improvements. The project includes office, shops, yard, warehouse, and parking to accommodate the Public Works MSA. The warehouse will also provide forcitywide warehousing and storage. Additionally, the project increases Safety Center parking and includes funding for public art. PROJECT NEED: Required to meet Growth Management Standards. FINANCING: Purpose Estimated Cost Design/Construction $16,594,319 Design/Construction $3,730,640 Design/Construction $6,927,118 Funding Source CFD#1 Sewer Replacement Water Replacement Total Cost =$27,252,077 Annual Operating Cost = $159,080 COMMSERV (Public Works Center)Page 4 POLICE AND FIRE FACILITY PROJECTS FUNDING MATRIX FOR POLICE AND FIRE FACILITY PROJECTS PROJ NO. 4003 3688 3901 3685 3686 FUND NO. 40031 36881 39011 36851 36861 PROJECT TITLE FIRE STATION #3 RELOCATION FIRE STATION #5 STORAGE BUILDING/RESTROOMS FIRE STATION #6 (PERMANENT) POLICE CAD IMPLEMENTATION PUBLIC SAFETY TRAINING FACILITY - PROP C FUNDING SOURCE CFD<M PFF GCC CFD*1 OTHER TOTAL BUDGET 6,801,600 316,600 5,830,000 2,312,228 950,000 FUTURE YEAR BUDGET AMOUNTS YEAR1 2007-08 YEAR 2 2008-2009 476,560 YEAR 3 2009-2010 5,221 ,440 YEAR 4 2010-2011 103,600 YEARS 2011-2012 YEAR 6-10 2012-2017 BUILDOUT 2017-2022 Page 5 CAPITAL PROJECT DESCRIPTION POLICE AND FIRE FACILITIES - FIRE STATION NO. 3 (RELOCATION) PROJECT NAME 4003 PROJECT NO. PROJECT LOCATION MAP: PROJECT, SITE CALAVERA HILLS COMMUNITYPARK PROJECT LOCATION: Southwest corner of Carlsbad Village Drive and Glasgow Street adjacent to Calavera Park or along Cannon Road between El Camino Real and College Boulevard. PROJECT DESCRIPTION: This new station will be a 6,200 square foot suburban facility housing one 3-person engine company. If the site is located along Cannon Road, a one (1) acre site would need to be acquired. Includes 1% cost for public art in compliance with Ordinance No. 1279. After relocation, the existing Fire Station No. 3 building and site will be sold. PROJECT NEED: Relocation of this fire station is required to ensure a five minute response time within the northeast quadrant of the City as development occurs. FINANCING: Purpose Environmental Design Construction Admin/Inspection Property Acquisition (1 FFE Total Cost = Estimated Cost Funding Source $158,000 $468,000 $4,571,600 $500,000 ac.) $1,000,000 $104,000 $6,801,600 PFF PFF PFF PFF PFF PFF FIRESTA3-2 Page 6 CAPITAL PROJECT DESCRIPTION POLICE AND FIRE FACILITIES - FIRE STATION NO. 5 STORAGE BUILDING/RESTROOMS PROJECT NAME 3688 PROJECT NO. PROJECT LOCATION MAP: SAFETY CENTER PROJECT PROJECT LOCATION: 2540 Orion Way adjacent to the Public Safety Center and Fire Station No. 5. PROJECT DESCRIPTION: Construct a 2,469 square foot combined public restrooms/secure storage facility adjacent to Fire Station No. 5. The structure will be designed and built to provide for fire equipment storage and roof ventilation training. The structure will be designed to accommodate a future second floor. The overall design will incorporate the same building materials as the existing building. The public restrooms will serve citizens utilizing the new Skateboard Park. PROJECT NEED: Current storage has been outgrown and portable, plastic enclosures are being used to alleviate problem. Project will provide additional enclosed, secure storage space at Fire Station No. 5. Facility will also include restrooms, vending machines, drinking fountain and pay phone for citizens using Skateboard Park. FINANCING: Purpose Construction Total Cost = Estimated Cost Funding Source $316,600 GCC $316,600 FSSstor Page 7 CAPITAL PROJECT DESCRIPTION POLICE AND FIRE FACILITIES - FIRE STATION NO. 6 (PERMANENT) PROJECT NAME 3901 PROJECT NO. PROJECT LOCATION MAP: PROJECT SITE PROJECT LOCATION: On the east side of Rancho Santa Fe Road. PROJECT DESCRIPTION: This new station will be a 6,200 square foot suburban facility housing one 3-person engine company. This station will require a traffic signal to gain access onto Rancho Santa Fe Road for response to emergencies. The signal will only be activated for emergency egress. This station also requires an access easement across the Habitat Conservation Plan area that requires approval of the Department of Fish & Game and the U.S. Wildlife Service. After construction, the existing temporary Station No. 6 will be dismantled and the land restored for use by the developer. Includes 1% cost for public art in compliance with Ordinance No. 1279. PROJECT NEED: The fire station is required to ensure a five minute response time within the southeast corner of the City as development occurs. FINANCING: Purpose Estimated Cost Environmental $155,000 Design $451,000 Construction $4,600,435 Construction Management $463,565 Admin/Inspection $160,000 Total Cost = $5,830,000 Funding Source PFF PFF PFF PFF PFF FIRESTA6 Page 8 CAPITAL PROJECT DESCRIPTION POLICE AND FIRE FACILITIES - POLICE CAD IMPLEMENTATION PROJECT NAME 3685 PROJECT NO. PROJECT LOCATION MAP: NOT APPLICABLE PROJECT LOCATION: Safety Center. PROJECT DESCRIPTION: This project will replace an existing 13 year old Computer Aided Dispatch (CAD) system and implement an 800 MHz radio data communication system. The replacement of the CAD system is necessary due to the age and outmoded technology of the existing system and the inability to implement major portions of the data communications system due to the outmoded technology of the existing system. PROJECT NEED: The primary purpose of the CAD system is to enable the police and fire departments to provide a timely response to emergency incidents. This supports Council Goal Strategic Goal of Top Quality Services by being able to provide timely responses that result in high customer satisfaction and improve work processes through the use of best technology and information. The technology of the existing CAD system prevents the police and fire departments from implementing components of the 800 MHz Data Communication system such as Automatic Vehicle Locator (AVL), integration with City mapping system, records retrieval and field reporting. FINANCING: Purpose Installation Total Cost = Estimated Cost $2,312,228 $2,312,228 Funding Source GCC CAData Page 9 CAPITAL PROJECT DESCRIPTION POLICE AND FIRE FACILITIES - PUBLIC SAFETY TRAINING FACILITY PROJECT NAME 3686 PROJECT NO. PROJECT LOCATION MAP:PROJECT LOCATION: Adjacent to the Carlsbad Safety Center and Fire Station No. 5. PROJECT DESCRIPTION: Preparation of site and design plans for a 25-lane shooting range, 4-story fire training tower, 2-story residential training prop, outdoor seating pavilion, fire administration office building with classroom, and storage facilities. PROJECT NEED: Existing Police Training Range facility within Veterans Memorial Park will be removed with the construction of the City golf course project. FINANCING: Purpose Design/Studies Total Cost = Estimated Cost $950,000 $950,000 Funding Source PropC FIRINGRANGE Page 10 LIBRARY FACILITY PROJECTS FUNDING MATRIX FOR LIBRARY FACILITY PROJECTS PROJ NO. 4001 4001 3771 FUND NO. 40011 40012 37711 PROJECT TITLE LIBRARY EXPANSION (COLE) LIBRARY EXPANSION (COLE) LIBRARY EXPANSION (LEARNING CENTER - ADVANCE) LIBRARY EXPANSION (LEARNING CENTER - ADVANCE) LIBRARY EXPANSION (LEARNING CENTER) FUNDING SOURCE CFD*1 PFF GCC CFD*1 OTHER TOTAL BUDGET 4,580,016 9,832,400 600,000 4,491,837 1,048,163 FUTURE YEAR BUDGET AMOUNTS YEAR1 2007-08 YEAR 2 2008-2009 YEAR 3 2009-2010 YEAR 4 2010-2011 YEARS 2011-2012 YEAR 6-10 2012-2017 BUILDOUT 2017-2022 4,580,016 9,832,400 Page 11 CAPITAL PROJECT DESCRIPTION LIBRARY FACILITIES - COLE LIBRARY EXPANSION PROJECT NAME NONE PROJECT NO. PROJECT LOCATION MAP:PROJECT LOCATION: At the site of the existing Cole Library, 1250 Carlsbad Village Drive, adjacent to the existing City Hall. PROJECT DESCRIPTION: Construction of a new 45,155 square foot library on the present site, east of the existing library building. PROJECT NEED: The Library Master Plan calls for expansion of the Cole Library to meet the growth management standard at buildout. The 1998 Feasibility Study recommends replacement of the existing library with a 45,155 square foot new building. This construction will satisfy the buildout growth management standard of 100,000+ square feet of library space. Project includes 1% for public art. FINANCING: Purpose Design/Construction Design/Construction Total Cost = Estimated Cost Funding Source $9,832,400 $4,580,016 $14,412,416 PFF CFD#1 EXP COLE Page 12 CAPITAL PROJECT DESCRIPTION LIBRARY FACILITIES - CARLSBAD LIBRARY LEARNING CENTER PROJECT NAME 3771 & 4001 PROJECT NO. PROJECT LOCATION MAP: PROJECT SITE PROJECT LOCATION: 3368 Eureka Place - adjacent to Holiday Park. PROJECT DESCRIPTION: The existing 5,723 square feet of building will be remodeled and a second story added consisting of 4,988 square feet (total 10,711 square feet). An existing home (housing Head Start) will be demolished and relocated to a modular building to be located on the east side of the property. The main building will allow the Adult Learning and Centre de Informacion to operate in a permanent location. PROJECT NEED: To provide a permanent location for the Adult Learning and Centre de Informacion programs. FINANCING: Purpose Construction Construction Construction Total Cost = Estimated Cost Funding Source $600,000 $4,491,837 $1,048,163 $6,140,000 GCC CFD#1 Other LEARNCTR Page 13 MISCELLANEOUS CITYWIDE PROJECTS FUNDING MATRIX FOR MISCELLANEOUS CITYWIDE PROJECTS PRO) NO. 3960 3455 3455 3455 3926 4002 4002 3634 3650 6015 FUND NO. 39601 34554 34557 34553 39261 40021 40022 36341 36501 60151 PROJECT TITLE BICYCLE MASTER PLAN CFD#1 ADMINISTRATION COASTAL RAIL TRAIL COASTAL RAIL TRAIL COASTAL RAIL TRAIL (CMAQ) OPPORTUNISTIC SAND PROGRAM PEDESTRIAN MASTER PLAN PEDESTRIAN MASTER PLAN PROPOSITION C PROJECTS PUBLIC WORKS INVENTORY AND FAC MAINT PROGRAM VILLAGE PUBLIC PARKING ENHANCEMENT PROGRAM VILLAGE STREETSCAPE IMPROVEMENTS FUNDING SOURCE TRANSNET/BIKE CFD*1 TRANSNET/BIKE OTHER FED GRNT STATE GRANT TDA GCC GCC GCC REDVL VILLAGE REDVL VILLAGE TOTAL BUDGET 150,000 1 ,004,032 221,800 184,176 4,413,784 57,240 100,000 150,000 17,734,205 404,992 850,000 400,000 FUTURE YEAR BUDGET AMOUNTS YEAR1 2007-08 110,000 YEAR 2 2008-2009 110,000 300,000 YEAR 3 2009-2010 110,000 YEAR 4 2010-2011 110,000 YEARS 2011-2012 110,000 YEAR 6-10 2012-2017 330,000 17,734,205 850,000 BUILDOUT 2017-2022 Page 14 CAPITAL PROJECT DESCRIPTION MISCELLANEOUS CITYWIDE PROJECTS - BICYCLE MASTER PLAN PROJECT NAME 3960 PROJECT NO. PROJECT LOCATION MAP: CITYWIDE PROJECT LOCATION: Citywide PROJECT DESCRIPTION: To study the City's bicycle needs and to develop a citywide bicycle network which will tie into regional bicycle paths and also with the City's Trails System. Construction of certain bicycle routes allows compliance with requirements of the Federal Clean Air Act. Requires completion of Environmental Impact Report. PROJECT NEED: In order to be eligible for certain funding sources, cities must have an adopted Bicycle Plan. FINANCING: Purpose Study/Report Environmental Total Cost = Estimated Cost Funding Source $63,000 $87,000 $150,000 TransNet/Bike TransNet/Bike BICYCLE Page 15 CAPITAL PROJECT DESCRIPTION NONE MISCELLANEOUS CITY WIDE PROJECTS - COMMUNITY FACILITIES DISTRICT #1 ADMINISTRATION PROJECT NO PROJECT NAME PROJECT LOCATION MAP: N/A CFD#1ADM PROJECT LOCATION: N/A PROJECT DESCRIPTION: City costs to administer Communities Facilities District No. 1 (CFD #1). PROJECT NEED: Administration of Communities Facilities District No. 1 is needed to assure that the CFD #1 taxes are properly levied and collected in conformance with State law and to be certain that funding for the CFD #1 projects is available at the time of need for the various projects. FINANCING: Purpose Administration Total Cost = Estimated Cost Funding Source $1,004,032 CFD #1 $1,004,032 Page 16 CAPITAL PROJECT DESCRIPTION MISCELLANEOUS CITYWIDE PROJECTS - COASTAL RAIL TRAIL PROJECT NAME 3455 PROJECT NO. PROJECT LOCATION MAP: CITY OF OCEJNSIDE PACIFIC OCEAN CITY OF ENCINITAS PROJECT LOCATION: Partially within the San Diego Northern Railroad (SDNRR) right-of-way between the northern and southern city limits. PROJECT DESCRIPTION: Construction of a 16-foot wide paved multi-modal bicycle/pedestrian trail including graded shoulders, landscaping, signage, safety devices at roadway crossings, bicycle loop detectors and other ancillary facilities. The Coastal Rail Trail through Carlsbad will be constructed in phases as funding allows. PROJECT NEED: The project accomplishes the Council goal of promoting multi-modal transportation facilities. The linking of four North County Coaster transit stations with a pedestrian/bicycle trail will encourage the use of non-motorized transport through the City, as well as to and from the transit stations. FINANCING: Purpose Design/Construction Design/Construction Design/Construction Estimated Cost $4,413,784 $221,800 $184,176 Funding Source TEA Trans/Bike APCD Total Cost =$4,819,760 RLtrail Page 17 CAPITAL PROJECT DESCRIPTION MISCELLANEOUS PROJECTS - OPPORTUNISTIC SAND PROGRAM PROJECT NAME 3926 PROJECT NO. PROJECT LOCATION MAP: HIGHWAY 78 BEACH NOURISHMENT SITE PROJECT LOCATION: Along the Carlsbad coastline. PROJECT DESCRIPTION: Secure permits from the regulatory and resource agencies to allow the City to administer a program of using inland sources of beach quality material for an ongoing local beach nourishment program. PROJECT NEED: To allow for an ongoing beach nourishment activity on the Carlsbad coastline. FINANCING: Purpose Estimated Cost Funding Source Study/Permits $57,240 State Grant Total Cost = $57,240 OpporsndNEW Page 18 CAPITAL PROJECT DESCRIPTION MISCELLANEOUS CITYWIDE PROJECTS - PEDESTRIAN MASTER PLAN PROJECT NAME 4002 PROJECT NO. PROJECT LOCATION MAP: N/A RED PLAN PROJECT LOCATION: N/A PROJECT DESCRIPTION: To study the City's pedestrian needs and develop a citywide pedestrian network which will tie into the City's trail system. Construction of certain pedestrian routes allow compliance with requirements of the Federal Clean Air Act. PROJECT NEED: A Pedestrian Master Plan is necessary to quality for certain funding sources. FINANCING: Purpose Estimated Cost Funding Source Study/Report Study/Report Total Cost = $100,000 $150,000 $250,000 TDA GCC Page 19 CAPITAL PROJECT DESCRIPTION MISCELLANEOUS CITYWIDE PROJECTS - PROPOSITION "C" PROJECTS PROJECT NAME NONE PROJECT NO. PROJECT LOCATION MAP: N/A PROJECT LOCATION: In miscellaneous locations throughout the City not specifically determined at this time. PROJECT DESCRIPTION: Spending of funds from various sources including the General Fund in an amount over $1 million to construct recreational facilities including a swimming pool complex, trails linkages and open space, a city safety training facility and a portion of Cannon Road east of College Boulevard (known as Reach 4). PROJECT NEED: Projects are needed for various reasons including compliance with growth management standards, compliance with General Plan Goals and Objectives and other community needs. The expenditure of funds for these projects from various sources including the General Fund were approved by a vote of the qualified voters of Carlsbad in a general election. FINANCING: Projects Original Set Aside Aquatic Complex City/Safety Train ing Facility Cannon Road - Reach 4 Trails/Open Space Remaining Allocation Allocation $35,000,000 $16,215,795 $1 ,050,000 $0 $0 $17,734,205 * Other funding sources may be substituted such fund sources become available. in lieu of GCC Funds as PROP C Projects Page 20 CAPITAL PROJECT DESCRIPTION MISCELLANEOUS CITYWIDE PROJECTS - PUBLIC WORKS INVENTORY AND FACILITIES MANAGEMENT PROGRAM PROJECT NAME 3634 PROJECT NO. PROJECT LOCATION MAP: NOT APPLICABLE PROJECT LOCATION: N/A PROJECT DESCRIPTION: This project will create a comprehensive computer based geographical information system (GIS) for all capital improvements maintained within the Public Works Major Service Area. In addition to establishing a computer inventory of all Public Works facilities, the program will establish service standards, track maintenance histories, identify hazard areas, project future replacement and maintenance needs and project future staffing levels needed to maintain the existing and projected Public Works inventory. PROJECT NEED: This project is needed to modernize the Public Works functions of the City. Presently, the inventory control and maintenance programming functions of the Public Works Service Area are disjointed, minimal or non-existent. This results in lowered maintenance and staffing efficiency. Completion of the program will result in better utilization of staff resources, improved maintenance of Public Works facilities, improved budgeting for maintenance services and capital projects and decreased facility life cycle costs. FINANCING: Purpose Data Acquisition/Programs Total Cost = Estimated Cost $404,992 $404,992 Funding Source GCC PW INVENT Page 21 CAPITAL PROJECT DESCRIPTION 3650 MISCELLANEOUS CITY WIDE PROJECTS - VILLAGE PUBLIC PARKING ENHANCEMENT PROGRAM PROJECT NAME PROJECT NO. PROJECT LOCATION MAP:PROJECT LOCATION: Within boundaries of Village Redevelopment Area. PROJECT DESCRIPTION: Implementation of recommendations within Village Parking Program, which include acquisition of land for future public parking, a study of impediments to full utilization of existing public parking lots, and improvements to existing public parking lots (as needed) to encourage full utilization of existing public parking lots. PROJECT NEED: Parking in the Village Redevelopment Area has been an issue for several years. A Village Parking Program is currently being prepared to address various parking issues within the Village. This program will identify recommended actions to pursue to address the underutilization of existing public parking lots and to plan for future parking needs. The proposed projects are consistent with the needs to address parking in the Village. FINANCING: Purpose Land Acquisition Total Cost = Estimated Cost $850,000 $850,000 Funding Source Village Redevelopment VILLGPKG Page 22 CAPITAL PROJECT DESCRIPTION 6015 MISCELLANEOUS CITYWIDE PROJECTS - VILLAGE STREETSCAPE IMPROVEMENTS PROJECT NO PROJECT NAME PROJECT LOCATION MAP: r\PROJECT AREA\ PROJECT LOCATION: Various locations in Village Redevelopment Area. PROJECT DESCRIPTION: Develop a plan to facilitate streetscape and landscaping improvements at various locations within the Village Redevelopment Area. This project may include a diagonal or other parking study to determine the appropriateness of adding on-street parking. An implementation project would be added at a later date to the CIP budget. PROJECT NEED: The Council has indicated an interest in pursuing enhancements and revitalizing the Village Area. The program is intended to address this need and is included within the Village Redevelopment Implementation Plan for 2005 to 2009. FINANCING: Purpose Study Design Total Cost = Estimated Cost Funding Source $100,000 $300,000 $400,000 Village Redevelopment Village Redevelopment VILLAGE Page 23 FACILITY MAINTENANCE PROJECTS FACILITY MAINTENANCE PROJECTS FUNDING MATRIX FOR FACILITIES MAINTENANCE PROJECTS PRO) NO. 3896 3942 3897 3943 4700 3861 3936 3937 FUND NO. 38961 39421 38971 39431 47001 38611 39361 39371 PROJECT TITLE BEACH ACCESS STAIRS REPLACEMENT COLE LIBRARY HVAC REPLACEMENT HOLIDAY PARK - RESTROOM IMPROVEMENTS LAGUNA RIVIERA PARK RESTROOM REPLACEMENT REPAIR RECOATING GUARDRAIL PAR BRIDGE AT CARLSBAD BLVD SENIOR CENTER COURTYARD LANDSCAPING STAGECOACH PARK PICNIC SHELTER STAGECOACH PARK SYNTHETIC TURF FUNDING SOURCE IRF IRF IRF IRF GCC GCC GCC GCC TOTAL BUDGET 517,500 1,319,790 530,808 260,000 130,000 30,000 100,000 1,718,000 FUTURE YEAR BUDGET AMOUNTS YEAR1 2007-08 YEAR 2 2008-2009 YEAR 3 2009-2010 YEAR 4 2010-2011 YEARS 2011-2012 YEAR 6-10 2012-2017 BUILDOUT 2017-2022 Page 24 CAPITAL PROJECT DESCRIPTION FACILITIES MAINTENANCE - BEACH ACCESS REPAIR/UPGRADES PROJECT NAME 3896 PROJECT NO. PROJECT LOCATION MAP: PROJECT SITE PROJECT LOCATION: Beach accesses at Christiansen Way, Beech Street, Carlsbad Village Drive, Grand Avenue, Rue Des Chateaux, Tamarack Avenue, Cherry Avenue, Maple Avenue, and Sycamore Avenue. PROJECT DESCRIPTION: Provide major repairs to beach accesses, replace existing deteriorated beach access steps, railing, and foundations. Upgrade base (re-engineer) to withstand high surf conditions, use heavy aluminum for handrails to replace existing eroded galvanized metal. PROJECT NEED: Major repairs are required to keep the beach accesses in a long-term safe condition. These improvements will dramatically reduce the amount of labor and materials currently being expended on painting and maintenance of steps and handrails. FINANCING: Purpose Design Construction Admin/Inspection Total Cost = Estimated Cost $37,000 $474,500 $6,000 $517,500 Funding Source IRF IRF IRF BEACHACC2 Page 25 CAPITAL PROJECT DESCRIPTION FACILITIES MAINTENANCE - COLE LIBRARY HVAC REPLACEMENT PROJECT NAME 3942 PROJECT NO. PROJECT LOCATION MAP:PROJECT LOCATION: Cole Library- 1250 Carlsbad Village Drive. PROJECT DESCRIPTION: Complete refurbishing or replacement of the current HVAC system with modern, energy efficient HVAC systems to improve reliability, efficiency, and reduce repair and maintenance costs. PROJECT NEED: The HVAC system is in need of major refurbishment or complete replacement in order to provide environmental control of the Cole Library. Major components of the system are in poor condition due primarily to age. At this time, it is not cost-effective to continue the intensive maintenance that is required to keep the system operational. There is a potential for a major component failure due to the age of the system that would render the entire system non-operational. FINANCING: Purpose Design/Studies Construction Total Cost = Estimated Cost $40,000 $1,279,790 $1,319,790 Funding Source IRF IRF Cole lib Page 26 CAPITAL PROJECT DESCRIPTION FACILITIES MAINTENANCE - HOLIDAY PARK RESTROOM IMPROVEMENTS PROJECT NAME 3897 PROJECT NO. PROJECT LOCATION MAP:PROJECT LOCATION: The two (2) restrooms are located in Holiday Park adjacent to Pio Pico Avenue. PROJECT DESCRIPTION: This project includes rehabilitating the two (2) existing 400 square foot facilities for wheelchair accessibility, installation of additional stalls and accessories, and roof replacements. PROJECT NEED: This project will meet the Council goal of providing Top Quality Services and will also comply with ADA standards. FINANCING: Purpose Design Construction Inspection Total Cost = Estimated Cost $27,000 $491,308 $12,500 $530,808 Funding Source IRF IRF IRF Holiday Page 27 CAPITAL PROJECT DESCRIPTION FACILITIES MAINTENANCE - LAGUNA RIVIERA PARK RESTROOM REPLACEMENT PROJECT NAME 3943 PROJECT NO. PROJECT LOCATION MAP:PROJECT LOCATION: Corner of Park Drive and Kelly Drive, adjacent to Kelly School. PROJECT DESCRIPTION: Remodel and/or replace existing park restrooms. PROJECT NEED: The facilities have deteriorated with age and constant use. To keep the park in a top-quality condition, a complete remodel or reconstruction of the structure is necessary. FINANCING: Purpose Design Construction Inspection Total Cost = Estimated Cost $10,000 $240,000 $10,000 $260,000 Funding Source IRF IRF IRF Lagunapk Page 28 CAPITAL PROJECT DESCRIPTION FACILITIES MAINTENANCE - REPAIR/RECOAT GUARDRAIL PALOMAR AIRPORT BRIDGE AT CARLSBAD BOULEVARD PROJECT NAME 4700 PROJECT NO. PROJECT LOCATION MAP: PROJECTSITE PROJECT LOCATION: Palomar Airport Bridge over San Diego Northern Railway tracks at Carlsbad Boulevard. PROJECT DESCRIPTION: On the existing bridge, remove existing coating on steel guardrail and apply a new moisture cured urethane coating to steel. Lead paint removal may be required which involves vacuum recovery system. Repair guardrail supports, clean sidewalks, investigate cracks on concrete columns, and make remedial repairs if required. PROJECT NEED: Existing bridge has severe corrosion on steel guardrails. Cracks at guardrail supports need to be repaired with epoxy cement. FINANCING: Purpose Study Construction Admin Total Cost = Estimated Cost $10,000 $110,000 $10,000 $130,000 Funding Source GCC GCC GCC PARBridge Page 29 CAPITAL PROJECT DESCRIPTION FACILITIES MAINTENANCE - SENIOR CENTER COURTYARD RENOVATION PROJECT NAME 3861 PROJECT NO. PROJECT LOCATION MAP:PROJECT LOCATION: Carlsbad Senior Center, 799 Pine Avenue. PROJECT DESCRIPTION: Re-landscape and upgrade the courtyard at the Carlsbad Senior Center including planting, irrigation new planters, hardscape improvements and possibly a water feature. PROJECT NEED: Landscaping in the Senior Center Courtyard has become overgrown during the past 12 years. A new plan incorporating new plantings and development of more user-friendly space is needed to make this feature of the facility more usable by the many customers. FINANCING: Purpose Design Construction Total Cost = Estimated Cost Funding Source $5,000 $25,000 $30,000 GCC GCC Senctryd Page 30 CAPITAL PROJECT DESCRIPTION FACILITIES MAINTENANCE - STAGECOACH PARK PICNIC SHELTER PROJECT NAME 3936 PROJECT NO. PROJECT LOCATION MAP:PROJECT LOCATION: Stagecoach Community Park, 3420 Camino de los Coches. PROJECT DESCRIPTION: Remove volleyball court and build picnic shelter. PROJECT NEED: To increase usage of Stagecoach Community Park by providing a shaded picnic area near an athletic field. FINANCING: Purpose Design Construction Admin/Inspection Total Cost = Estimated Cost $15,000 $77,000 $8,000 $100,000 Funding Source GCC GCC GCC Picnic Page 31 CAPITAL PROJECT DESCRIPTION FACILITIES MAINTENANCE - STAGECOACH PARK SYNTHETIC TURF FIELDS PROJECT NAME 3937 PROJECT NO. PROJECT LOCATION MAP:PROJECT LOCATION: Stagecoach Park - Camino de los Coches PROJECT DESCRIPTION: Construct/install synthetic turf fields on field numbers 2 and 3 at Stagecoach Park. PROJECT NEED: Existing fields are in very poor condition and they cannot take the constant wear-and-tear from soccer and baseball activities. The growth in population has created a demand for fields that cannot be met with prolonged periods of closure. These fields will be open 365 days a year and maintenance cost can be reduced. FINANCING: Purpose Design Construction Admin/Inspection Total Cost = Estimated Cost Funding Source $25,000 $1,618,000 $75,000 $1,718,000 IRF IRF IRF Stgcoach2 Page 32 PARKS PROJECTS CITYWIDE PARKS PROJECTS FUNDING MATRIX FOR CITYWIDE PARKS PROJECTS PROJ NO. 3972 3866 4500 4500 FUND NO. 39722 38661 45001 45002 PROJECT TITLE BUSINESS PARK RECREATIONAL FACILITY CARLSBAD MUNICIPAL GOLF COURSE LAKE CALAVERA TRAILS MASTER PLAN/CONSTRUCTION SENIOR CTR EXPANSION - 1ST FLOOR SENIOR CTR EXPANSION - 2ND FLOOR VETERAN'S MEMORIAL PARK FUNDING SOURCE ZONES GOLF COURSE GCC REDVL VILLAGE GCC CFDfM TOTAL BUDGET 3,015,753 55,441,655 598,750 1,082,044 529,162 22,453,930 FUTURE YEAR BUDGET AMOUNTS YEAR1 2007-08 YEAR 2 2008-2009 YEAR 3 2009-2010 YEAR 4 2010-2011 YEARS 2011-2012 YEAR 6-10 2012-2017 11,226,503 BUILDOUT 2017-2022 3,015,753 1 1 ,227,427 Page 33 CAPITAL PROJECT DESCRIPTION CITYWIDE PARKS PROJECTS - BUSINESS PARK RECREATIONAL FACILITY PROJECT NAME NONE PROJECT NO. PROJECT LOCATION MAP:PROJECT LOCATION: In Zone 5, at the corner of Faraday and Camino Hills. PROJECT DESCRIPTION: In FY 98-99, the City acquired 13 acres to develop into the Business Park Recreation Facility. Proposed amenities may include a fitness center, ball fields, soccer fields, basketball, handball, volleyball courts, picnic areas, jogging trails, etc. It is anticipated staff will meet with the business park community to gather input into the most needed amenities. The City may explore privatization options for a portion of the development (e.g., the fitness center), which may accelerate development. Project includes 1% for public art. PROJECT NEED: Demand and need for recreational facilities within the industrial area identified through a Parks and Recreation Commission subcommittee who conducted two independent surveys and received input from Zone 5, 13, and 16 developers. FINANCING: Purpose Design/Construction Total Cost = Estimated Cost Funding Source $3,015,753 Zone 5 Fee $3,015,753 BUS PARK Page 34 CAPITAL PROJECT DESCRIPTION CITYWIDE PARKS PROJECTS - CARLSBAD MUNICIPAL GOLF COURSE PROJECT NAME 3972 PROJECT NO. PROJECT LOCATION MAP:PROJECT LOCATION: Palomar Airport Road and College Boulevard. PROJECT DESCRIPTION: Design and construct an 18-hole championship golf course. Work will include grading, landscaping a clubhouse, access roads and utilities. The Golf Course Steering Committee may consider additional features to be included. PROJECT NEED: Because of strong citizen interest, the Parks and Recreation Commission recommended building a golf course. Part of the Parks and Recreation Element of the General Plan. FINANCING: Purpose Estimated Cost Design/Environmental $3,000,000 Construction $52,441,655 Funding Source Golf Course Enterprise Fund Golf Course Enterprise Fund Total Cost =$55,441,655 GOLFDEV Page 35 CAPITAL PROJECT DESCRIPTION CITYWIDE PARKS PROJECTS - LAKE CAL AVER A TRAILS MASTER PLAN PROJECT NAME 3866 PROJECT NO. PROJECT LOCATION MAP: LAKE:ALAVERA e PROJECT SITE PROJECT LOCATION: In the Northeast Quadrant - Lake Calavera City Mitigation Site. PROJECT DESCRIPTION: Develop a Master Plan for a public multi-use, recreational trail system situated within a 266-acre property owned by the City. Trails to be developed as multi- purpose non-paved recreational trails with trailhead parking area, signage, benches, litter receptacles, interpretive signage and passive picnic areas. Project includes utilizing volunteers to construct approximately 2.5 miles of the proposed 5 miles of trails. PROJECT NEED: This project is part of the citywide trails program and trails in the Lake Calavera area have been identified in the City's Open Space and Conservation Resource Management Plan for the Lake Calavera area, as well as the Trails Feasibility Study done in 1990. Citizens surveys indicate the desire to have increased access to open space and trails. Voters approved Prop C in 2002 which identified trails as one of the recreational facilities they would support funding. FINANCING: Purpose Environmental Design Construction Total Cost = Estimated Cost $35,000 $50,000 $513,750 Funding Source GCC GCC GCC $598,750 Annual Operating Cost = $20,000 Lake cal Page 36 CAPITAL PROJECT DESCRIPTION CITYWIDE PARKS PROJECTS - SENIOR CENTER EXPANSION 1ST FLOOR PROJECT NAME 4500 PROJECT NO. PROJECT LOCATION MAP: PROJECT SITE PROJECT LOCATION: Senior Center Building located at Pine Avenue and Harding Street. PROJECT DESCRIPTION: ,STTenant improvements to the 1 floor area of existing Senior Center. Improvements include exercise rooms, art room, t.v. room, multi-purpose room, game room, health screening room, and computer room. PROJECT NEED: Needed to meet the needs of a growing senior population and expanding program needs. FINANCING: Purpose Design/Construction Total Cost = Estimated Cost $1,082,044 $1,082,044 Funding Source Redev Village SeniorCtrl Page 37 CAPITAL PROJECT DESCRIPTION CITYWIDE PARKS PROJECTS - SENIOR CENTER EXPANSION 2ND FLOOR PROJECT NAME 4500 PROJECT NO. PROJECT LOCATION MAP: PROJECT SITE PROJECT LOCATION: Senior Center Building located at Pine Avenue and Harding Street. PROJECT DESCRIPTION: Tenant improvements to the 2nd floor area of existing Senior Center (approximately 5,770 square feet) into City offices. PROJECT NEED: Needed office space for City functions. FINANCING: Purpose Estimated Cost Design/Construction $529,162 Total Cost = $529,162 Funding Source GCC SeniorCtr2 Page 38 CAPITAL PROJECT DESCRIPTION CITYWIDE PARKS PROJECTS - VETERAN'S MEMORIAL PARK PROJECT NAME NONE PROJECT NO. PROJECT LOCATION MAP: AGUAHEDIONDA\ LAGOON PROJECT LOCATION: This property is located south and east of Agua Hedionda Lagoon, near the geographic center of Carlsbad. PROJECT DESCRIPTION: The Master Plan for development of Veteran's Memorial Park includes the following improvements: streets, utilities, community leisure needs, open space interpretive area, parking and maintenance facility. Other suggested uses for this park area include amphitheater complex, sports complex, conference center and numerous other active/passive recreational amenities. Project funding includes 1 % for public art. PROJECT NEED: The Macario Canyon property has been under City lease or ownership for a number of years. The development of this property, since it is centrally located, would provide the needed parkland for all quadrants at buildout. Part of the Parks and Recreation Element of the General Plan. FINANCING: Purpose Design/Construction Total Cost = Estimated Cost $22,453,930 $22,453,930 Funding Source CFD#1 VETERAN Page 39 NORTHWEST QUADRANT PARKS PROJECTS FUNDING MATRIX FOR NORTHWEST QUADRANT PARKS PROJECTS PROJ NO. 3802 FUND NO. 38022 PROJECT TITLE PINE AVENUE PARK - PHASE 1 PINE AVENUE PARK - PINE COMMUNITY BUILDING - PHASE II PINE AVENUE PARK - PINE COMMUNITY BUILDING - PHASE II FUNDING SOURCE PFF PIL-NW PFF TOTAL BUDGET 7,082,000 1 ,724,039 7,625,178 FUTURE YEAR BUDGET AMOUNTS YEAR1 2007-08 YEAR 2 2008-2009 YEAR 3 2009-2010 584,091 YEAR 4 2010-2011 1 ,724,039 7,041 ,087 YEARS 2011-2012 YEAR 6-10 2012-2017 BUILDOUT 2017-2022 Page 40 CAPITAL PROJECT DESCRIPTION NORTHWEST QUADRANT PARKS - PINE AVENUE PARK PHASE I PROJECT NAME 3802 PROJECT NO. PROJECT LOCATION MAP: SITE PROJECT LOCATION: Pine School site; within the block of Harding, Pine, Chestnut and Madison. PROJECT DESCRIPTION: Develop seven (7) acres of land as a park. Development may include lighted baseball fields, lighted multi-use turfed area, roofed picnic structure, parking lot, tot-lot and landscaping. Also includes 1% for public art. Project includes undergrounding of existing overhead utility lines on adjacent streets. PROJECT NEED: Required to meet Growth Management Standards and identified in the Parks and Recreation Element of the General Plan. FINANCING: Purpose Design Construction Admin/Inspection Total Cost = Estimated Cost $1,040,000 $5,572,000 $470,000 $7,082,000 Funding Source PFF PFF/PIL-NW PFF Annual Operating Cost = $120,000 Parksit2 Page 41 CAPITAL PROJECT DESCRIPTION NONE NORTHWEST QUADRANT PARKS - PINE AVENUE PARK - PHASE II (COMMUNITY BUILDING) PROJECT NO PROJECT NAME PROJECT LOCATION MAP: SITE PROJECT LOCATION: Pine Avenue Park. PROJECT DESCRIPTION: Construct a 20,000 square foot community facility/gymnasium. Facility will include basketball, volleyball, gymnastics, multi-purpose rooms, meeting rooms, teen center, and office space. PROJECT NEED: Required to meet Growth Management Standards, identified in the Parks and Recreation Element of the General Plan, and meets Recreation Facility Guidelines for one community center per quadrant. FINANCING: Purpose Design/Construction Design/Construction Total Cost = Estimated Cost $1,724,039 $7,625,178 $9,349,217 Funding Source PIL-NW PFF Pinepkll Page 42 NORTHEAST QUADRANT PARKS PROJECTS FUNDING MATRIX FOR NORTHEAST QUADRANT PARKS PROJECTS PROJ NO. 3856 3698 3801 FUND NO. 38561 36981 38011 PROJECT TITLE HIDDEN CANYON PARK (22.3 ACRES) PARK SITE ACQUISITION (15 ACRES) NE QUADRANT PARK PARK SITE DEVELOPMENT (15 ACRES) FUNDING SOURCE PIL-NE PFF PIL-NE TOTAL BUDGET 1 ,886,766 4,550,000 4,000,000 FUTURE YEAR BUDGET AMOUNTS YEAR1 2007-08 YEAR 2 2008-2009 YEAR 3 2009-2010 YEAR 4 2010-2011 YEARS 2011-2012 YEAR 6-10 2012-2017 BUILDOUT 2017-2022 4,000,000 Page 43 CAPITAL PROJECT DESCRIPTION NORTHEAST QUADRANT PARKS - HIDDEN CANYON PARK PROJECT NAME 3856 PROJECT NO. PROJECT LOCATION MAP:PROJECT LOCATION: This project is located in the northeast quadrant on the north side of Carlsbad Village Drive, west of Concord Street. PROJECT DESCRIPTION: This 22.3 acre site is constrained by steep slopes, sensitive habitat and power lines. For that reason, grading and development will be confined to a small area. Park development may consist of limited grading and construction of two tot-lots, restroom, a picnic area, a level turfed area, a parking lot at Vancouver Street, expansion of gravel parking lot at Dog Park, and a trail system. Project funding includes 1% for public art. PROJECT NEED: Part of the Parks and Recreation Element of the General Plan and required to meet Growth Management Standards. Currently there are numerous apartments and attached housing projects in this area with a large number of children requiring recreational area. FINANCING: Purpose Design Construction Admin/Inspection Total Cost = Estimated Cost $90,000 $1,664,766 $132,000 $1,886,766 Funding Source PIL-NE PIL-NE PIL-NE Annual Operating Cost = $120,000 HIDCNYPK Page 44 CAPITAL PROJECT DESCRIPTION NORTHEAST QUADRANT PARK - PARK SITE ACQUISITION PROJECT NAME 3698 PROJECT NO. PROJECT LOCATION MAP: HWY 78 PROJECT AREA PROJECT LOCATION: In the northeast quadrant, possibly within the Robertson Ranch development. PROJECT DESCRIPTION: Acquire ± 15 acres for future development of ball fields. PROJECT NEED: Because of development constraints, Hidden Valley Park was unable to fulfill the need for active ball fields. Therefore, ± 15 acres will be acquired somewhere in the northeast quadrant for ballfield development to meet the City's guidelines for numbers of ball fields per quadrant. FINANCING: Purpose Land Acquisition Total Cost = Estimated Cost $4,550,000 $4,550,000 Funding Source PIL-NE NEQUAD 1 Page 45 CAPITAL PROJECT DESCRIPTION NORTHEAST QUADRANT PARKS - PARK SITE DEVELOPMENT PROJECT NAME 3801 PROJECT NO. PROJECT LOCATION MAP: HWY 78 PROJECT AREA PROJECT LOCATION: Within northwest quadrant of the City, possible site identified in future Robertson Ranch development near the corner of Cannon Road and El Camino Real. PROJECT DESCRIPTION: Develop ±15 acres for soccer fields with restrooms and parking. PROJECT NEED: Fifteen (15) acres will be developed somewhere in the northeast quadrant for sports fields to meet the City's guidelines for numbers of sports fields per quadrant. FINANCING: Purpose Construction Total Cost = Estimated Cost $4,000,000 $4,000,000 Funding Source PIL-NE NEQUAD 3 Page 46 SOUTHWEST QUADRANT PARKS PROJECTS FUNDING MATRIX FOR SOUTHWEST QUADRANT PARKS PROJECTS PROJ NO. 3699 3649 4502 4502 FUND NO. 36991 36491 45021 45021 PROJECT TITLE AVIARA COMMUNITY PARK (24.25 ACRES) * AVIARA COMMUNITY PARK COMMUNITY BUILDING AVIARA COMMUNITY PARK COMMUNITY BUILDING AVIARA REIMBURSEMENT AGREEMENT POINSETTIA COMMUNITY PARK - PARKING POINSETTIA COMMUNITY PARK - TENNIS COURTS & COMMUNITY CENTER FUNDING SOURCE PFF PFF PIL-SW P1L-SW PFF PFF TOTAL BUDGET 10,700,000 7,374,076 2,607,483 238,000 963,400 13,660,238 FUTURE YEAR BUDGET AMOUNTS YEAR1 2007-08 60,215 YEAR 2 2008-2009 903,185 YEAR 3 2009-2010 YEAR 4 2010-2011 914,606 YEARS 2011-2012 1 1 ,656,432 YEAR 6-10 2012-2017 BUILDOUT 2017-2022 7,374,076 2,607,483 Page 47 CAPITAL PROJECT DESCRIPTION SOUTHWEST QUADRANT PARKS - AVIARA COMMUNITY PARK - PHASE I PROJECT NAME 3699 PROJECT NO. PROJECT LOCATION MAP: PROJECT SITE PROJECT LOCATION: Northwest corner of Poinsettia Lane and Ambrosia Road. PROJECT DESCRIPTION: Construction of a 24-acre community park that would provide one lighted adult soccer field, one ballfield, two 1/2 court basketball court, tot-lot, open turf and picnic area, parking, and a maintenance building. Project includes 1% for Public Art. PROJECT NEED: Required to meet Growth Management Standards and identified in the Parks and Recreation Element of the General Plan. FINANCING: Purpose Planning/Study Environmental Design Construction Total Cost = Estimated Cost $235,000 $15,000 $250,000 $10,200,000 $10,700,000 Funding Source PFF PFF PFF PFF Annual Operating Cost = $340,000 Zone19-l Page 48 CAPITAL PROJECT DESCRIPTION NONE SOUTHWEST QUADRANT PARKS - AVIARA COMMUNITY PARK - PHASE II (COMMUNITY BUILDING) PROJECT NAME PROJECT NO. PROJECT LOCATION MAP: 'PROJECT SITE PROJECT LOCATION: In the southwest quadrant at the northern end of the Aviara community at the intersection of Poinsettia Lane and Ambrosia. PROJECT DESCRIPTION: Construction of a 18,000 square foot community facility that would include meeting and activity rooms and park offices. Project includes 1 % for Public Art. PROJECT NEED: Required to meet Growth Management Standards and identified in the Parks and Recreation Element of the General Plan and meets the Recreation Facility Guidelines. FINANCING: Purpose Design/Construction Design/Construction Total Cost = Estimated Cost $2,607,483 $7,374,076 $9,981,559 Funding Source PIL-SW PFF Zone19ll Page 49 CAPITAL PROJECT DESCRIPTION SOUTHWEST QUADRANT PARKS - AVIARA REIMBURSEMENT AGREEMENT PROJECT NAME 3649 PROJECT NO. PROJECT LOCATION MAP: PROJECT SITE PROJECT LOCATION: In the southwest quadrant, at the northern tip of Zone 19, north of Poinsettia Lane and west of El Camino Real. PROJECT DESCRIPTION: This is a reimbursement to the Aviara Land Associates Company made in accordance with the Aviara Master Plan parks agreement relating to the acquisition of property for the future Zone 19 park site. PROJECT NEED: The Zone 19 park is required to meet growth management for park land within the southwest quadrant. FINANCING: Purpose Reimbursement Total Cost = Estimated Cost $238,000 $238,000 Funding Source PIL-SW Aviareim Page 50 CAPITAL PROJECT DESCRIPTION NONE SOUTHWEST QUADRANT PARKS - POINSETTIA PARK PHASE II - PARKING EXPANSION PROJECT NO PROJECT NAME PROJECT LOCATION MAP: PROJECT PROJECT LOCATION: Within existing Poinsettia Community Park. PROJECT DESCRIPTION: Add two parking lots that are part of Phase II of the Poinsettia Park Master Plan. PROJECT NEED: Lack of adequate parking during peak use times has created a local parking concern with cars parking on the access road. This could potentially restrict ingress and egress of emergency vehicles. The additional parking will provide more spaces during peak times. The additional parking lots are part of the original Poinsettia Community Park Master Plan. FINANCING: Purpose Design Construction Total Cost = Estimated Cost $60,215 $903,185 $963,400 Funding Source PFF PFF POINPKJI Page 51 CAPITAL PROJECT DESCRIPTION SOUTHWEST QUADRANT PARKS - POINSETTIA COMMUNITY PARK (PHASE Ih PROJECT NAME 4502 PROJECT NO. PROJECT LOCATION MAP: PROJECT PROJECT LOCATION: Poinsettia Community Park in the southwest quadrant east of Paseo del Norte between Palomar Airport Road and Poinsettia Lane. PROJECT DESCRIPTION: Phase II of this 42 acre park includes development of the remainder of the facilities identified in the Master Plan. Amenities will include a community facility/gymnasium, enclosed soccer field, tot lot, picnic areas, tennis complex, and additional parking. Includes 1 % for public art. PROJECT NEED: Required to meet Growth Management Standards and identified in the Parks and Recreation Element of the General Plan. Also needed to meet the Recreation Facility Guidelines. FINANCING: Purpose Estimated Cost $1,089,200Tennis Courts Community Center & Center Court Complex $12,571,038 Funding Source PFF PFF Total Cost =$13,660,238 Poins Page 52 SOUTHEAST QUADRANT PARKS PROJECTS FUNDING MATRIX FOR SOUTHEAST QUADRANT PARKS PROJECTS PRO) NO. 3837 3925 3925 3925 3961 3961 4501 FUND NO. 38372 39251 39251 39252 39612 39611 45011 PROJECT TITLE ALGA NORTE PARK - PHASE I (30 ACRES) ALGA NORTE PARK - PHASE II (POOL) ALGA NORTE PARK - PHASE II (POOL) ALGA NORTE PARK - PHASE II (POOL) PROP C FUNDS CARRILLO BARN RESTORATION LEO CARRILLO - HISTORIC BARN (50% GRANT) LEO CARRILLO EVENT AREA EXPANSION LEO CARRILLO PARK - EROSION CONTROL LEO CARRILLO PARK - PHASE III LEO CARRILLO PARK - PHASE III FUNDING SOURCE PFF PFF GCC GCC PFF GCC PIL-SE GCC PFF PIL-SE TOTAL BUDGET 22,107,510 6,099,695 6,000,000 16,215,795 33,000 500,000 267,000 267,000 1,987,400 836,800 FUTURE YEAR BUDGET AMOUNTS YEAR1 2007-08 6,194,940 4,976,795 20,550 YEAR 2 2008-2009 246,450 YEAR 3 2009-2010 YEAR 4 2010-2011 YEARS 2011-2012 YEAR 6-10 2012-2017 BUILDOUT 2017-2022 1 ,987,400 836,800 Page 53 CAPITAL PROJECT DESCRIPTION SOUTHEAST QUADRANT PARKS - ALGA NORTE PARK - PHASE I PROJECT NAME 3837 PROJECT NO. PROJECT LOCATION MAP: PROJECT SITE PROJECT LOCATION: In the Southeast Quadrant, east of El Camino Real and north of and adjacent to future Poinsettia Lane. PROJECT DESCRIPTION: The first phase of this project will include development of approximately 30 acres of the proposed total of 30 acres of park. Amenities include ballfields, basketball courts, picnic areas, restrooms, parking, skate park, dog park, tot lots, etc. Also included is 1% for Public Art. PROJECT NEED: Required to meet Growth Management Standards and identified in the Parks and Recreation Element of the General Plan. FINANCING: Purpose Design Construction Admin/Inspection Total Cost = Estimated Cost $842,830 $20,483,705 $780,975 $22,107,510 Funding Source PFF PFF PFF Annual Operating Cost = $347,000 ALGANOR2 Page 54 CAPITAL PROJECT DESCRIPTION SOUTHEAST QUADRANT PARKS - ALGA NORTE PARK PHASE II (AQUATICS CENTER) PROJECT NAME 3925 PROJECT NO. PROJECT LOCATION MAP: PROJECT SITE PROJECT LOCATION: In the Southeast Quadrant, east of El Camino Real and north and adjacent to the future Poinsettia Lane. PROJECT DESCRIPTION: Construction of a 50 meter pool with a pool office facility, showers/restrooms, parking and perimeter landscaping. PROJECT NEED: Alga Norte Park is identified in the Parks and Recreation Element as the site of a future public swimming pool. The existing swim complex is currently past capacity. A new 50 meter pool will assure that adequate swimming facilities will be available for current and future residents. Also includes 1% for Public Art. FINANCING: Purpose Design Construction Admin/FFE Total Cost = Estimated Cost $1,051,170 $26,290,295 $974,025 $28,315,490 Funding Source PFF/GCC PFF/GCC PFF/GCC Annual Operating Cost = $453,000 ALGANOR1 Page 55 CAPITAL PROJECT DESCRIPTION SOUTHEAST QUADRANT PARKS - CARRILLO RANCH PHASE III BARN/THEATER PROJECT NAME 3961 PROJECT NO. PROJECT LOCATION MAP:PROJECT LOCATION: Within Carrillo Ranch Park. PROJECT DESCRIPTION: Construction of the "Barn/Theater" portion of future Phase III of Carrillo Ranch. Includes foundation, roof, and wall stabilization and miscellaneous other renovations. PROJECT NEED: The Carrillo Ranch Master Plan calls for the renovation and adoptive reuse of the barn into a theater for visitor orientation presentations, showing old Leo Carrillo films, and various educational purposes. The project will also provide revenue generating opportunities as it can be rented as a meeting facility. FINANCING: Purpose Design Construction Construction Administration Total Cost = Estimated Cost $66,000 $412,000 $33,000 $22,000 $533,000 Funding Source GCC GCC PFF GCC CarrilloBarn Page 56 CAPITAL PROJECT DESCRIPTION SOUTHEAST QUADRANT PARKS - CARRILLO RANCH EVENT AREA EXPANSION PROJECT NAME 4503 PROJECT NO. PROJECT LOCATION MAP: PROJECT SITE PROJECT LOCATION: In Carrillo Ranch, west side of existing lawn event area. PROJECT DESCRIPTION: Construct a new patio area of approximately 2,500 square feet. Includes flagstone patio, seat wall, minimal lighting, adjacent landscape, and an access road for caterers. PROJECT NEED: The popularity of the Carrillo Ranch for parties and weddings has been substantial. With this comes wear-and-tear on the structures and the lawn area cannot be sustained without closing the area periodically. This added space will provide a more level area for tables and chairs, provide a more attractive venue for events, and increase revenue potential. FINANCING: Purpose Design Construction Total Cost = Estimated Cost $20,550 $246,450 $267,000 Funding Source PIL-SE PIL-SE CAR EVENT Page 57 CAPITAL PROJECT DESCRIPTION SOUTHEAST QUADRANT PARKS - CARRILLO RANCH EROSION REPAIR PROJECT NAME 4501 PROJECT NO. PROJECT LOCATION MAP:PROJECT LOCATION: Carrillo Ranch Park. PROJECT DESCRIPTION: Correct erosion problems in select decomposed granite paving areas of the recently completed Carrillo Ranch Phase II project, including adding drainage structures and stabilization binders. PROJECT NEED: Certain areas of decomposed granite paving have incurred severe erosion during recent rain storms. Sediment from erosion has caused an unsafe park condition resulting in park closures, continues to require expensive maintenance, and may pose sedimentation problems in the two creeks that border the park. FINANCING: Purpose Design Construction Admin/Inspection Total Cost = Estimated Cost $5,122 $238,836 $23,042 $267,000 Funding Source GCC GCC GCC CarrilloErosion Page 58 CAPITAL PROJECT DESCRIPTION SOUTHEAST QUADRANT PARKS - LEO CARRILLO PARK - PHASE PROJECT NAME NONE PROJECT NO. PROJECT LOCATION MAP:PROJECT LOCATION: In the Southeast Quadrant, approximately one mile south of Palomar Airport Road adjacent to the future extension of Melrose Drive and future Poinsettia Lane. PROJECT DESCRIPTION: Development of historical ranch into a community park. Project includes completion of remainder of Master Plan (not completed in Phase II). Project includes renovation of additional buildings, construction of additional restrooms, arboretum area, additional landscaping, etc. PROJECT NEED: Required to meet Growth Management Standards and identified in the Parks and Recreation Element of the General Plan. FINANCING: Purpose Design/Construction Design/Construction Total Cost = Estimated Cost $1,987,400 $836,800 $2,824,200 Funding Source PFF PIL-SE LEOCRIII Page 59 DRAINAGE PROJECTS DRAINAGE PROJECTS FUNDING MATRIX FOR DRAINAGE PROJECTS PROJ NO. 3338 6605 3624 3636 3636 6601 3622 6600 6606 6602 3872 3681 6603 6604 FUND NO. 33381 66051 36241 36363 36363 66011 36225 66001 66061 66021 38721 36811 66031 66041 PROJECT TITLE AGUA HEDIONDA CHANNEL (PLDA "B") CALLE GAVANZO DRAINAGE CARLSBAD BLVD STORM DRAIN REPLACEMENT CMP REPLACEMENT PROGRAM COLLEGE BLVD. BRIDGE FACILITY BL (REIMB./PLDA "B") COLLEGE BLVD/CANNON RD (BASIN BJB - REIMB./PLDA "B") (FEMA + PLD) COLLEGE BLVD/CANNON RD (BJ AND CALAVERA CR. CHANNEL) CYNTHIA LANE STORM DRAIN FARADAY/MELROSE DRAINAGE FACILITIES (PLDA "B") HIGHLAND DRIVE - BETWEEN PINE & BASSWOOD KELLY DRIVE CHANNEL REPAIR LA COSTA AVE STORM DRAIN REPLACEMENT MASTER PLAN UPDATE MISCELLANEOUS MASTER DRAINAGE FACILITIES MISCELLANEOUS ROAD SUBDRAINS NW QUADRANT STORM DRAIN IMPROVEMENT PROGRAM PARK DRIVE AND TAMARACK AVENUE STORM DRAIN (PLDA "B") RIDGECREST DRAINAGE IMPROVEMENTS ROMERIA DRAINAGE IMPROVEMENTS TAMARACK AND ECR STORM DRAIN AND SILT. BASIN (REIMB./PLDA "B") FUNDING SOURCE PLD GCC IRF IRF PLD PLD PLD IRF PLD ecc IRF IRF PLD PLD GAS TAX GCC PLD GCC GCC PLD TOTAL BUDGET 1,680,522 62,500 218,000 2,230,000 1,847,188 830,910 2,778,833 253,750 300,000 196,101 1,112,000 492,150 454,933 10,936,000 485,000 3,295,355 610,000 117,500 274,000 1,279,000 FUTURE YEAR BUDGET AMOUNTS YEAR1 2007-08 138,000 575,000 153,750 240,000 305,250 YEAR 2 2008-2009 620,000 632,000 407,000 YEARS 2009-2010 365,000 40,000 384,825 YEAR 4 2010-2011 460,000 408,650 YEARS 2011-2012 210,000 684,230 YEAR 6-10 2012-2017 1,847,188 1,105,400 610,000 BUILDOUT 2017-2022 10,936,000 1 ,279,000 Page 60 CAPITAL PROJECT DESCRIPTION DRAINAGE PROJECTS - AGUA HEDIONDA CHANNEL IMPROVEMENTS PROJECT NAME 3338 PROJECT NO. PROJECT LOCATION MAP: PROJECT SITE PROJECT LOCATION: Along the Agua Hedionda Creek Channel from the downstream edge of the Cannon Road bridge to approximately 3,100 feet upstream of the El Camino Real bridge. PROJECT DESCRIPTION: The proposed work includes dredging approximately 40,000 cubic yards of accumulated sediment from within the Agua Hedionda channel, widening and improvement of the channel at the confluence of the Agua Hedionda and Calavera Creeks, reconstruction of the bridge piers under El Camino Real to streamline flows and reduce potential blockages, stabilization of the Calavera Creek channel and mitigation work for the impacts associated with the channel improvement project. Further studies will determine the scope of the mitigation work and the construction costs associated with mitigation and construction. The project may also include removal of the weir wall at the confluence of Calavera Creek with Little Encinas Creek and modifications to the outlet structure at Basin BJB. PROJECT NEED: Required by the Drainage Master Plan to mitigate potential flooding impacts to the Rancho Carlsbad Mobile Home Park development. FINANCING: Purpose Studies/Design Total Cost = Estimated Cost $1,680,522 $1,680,522 Funding Source PLDA "B" Fees STORMDR1 Page 61 CAPITAL PROJECT DESCRIPTION DRAINAGE PROJECTS - CALLE GAVANZO SUBSURFACE DRAINAGE IMPROVEMENT PROJECT NAME 6605 PROJECT NO. PROJECT LOCATION MAP:PROJECT LOCATION: Calle Gavanzo Street. PROJECT DESCRIPTION: West side of Calle Gavanzo shows signs of a subsurface drainage problem. The problem causes continuous wet pavement on the west side of the street. The project will require installation of subsurface draining in the street and street surface repair. PROJECT NEED: The subsurface drainage problem causes pavement damage from continuous wet pavement. In addition, the pavement is slowly separating from the gutter. Local residents state drains were installed on the east side of the street in previous years. FINANCING: Purpose Design Construction Admin/Inspection Total Cost = Estimated Cost $7,500 $50,000 $5,000 $62,500 Funding Source GCC GCC GCC CALLE GAV Page 62 CAPITAL PROJECT DESCRIPTION DRAINAGE PROJECTS - CARLSBAD BOULEVARD STORM DRAIN REPLACEMENT PROJECT NAME 3624 PROJECT NO. PROJECT LOCATION MAP:PROJECT LOCATION: From Carlsbad Boulevard to the San Diego Northern Railroad tracks just south of the railroad overcrossing. PROJECT DESCRIPTION: Relocate and replace approximately 350 feet of 18-inch corrugated metal storm drain pipe (CMP) with a reinforced concrete storm drain pipe. Project would include installation of new storm drain inlets and an outlet. PROJECT NEED: The existing CMP has corroded away and drainage water is now undermining the soil column above the pipe. Recently, a sinkhole developed which required extensive maintenance repairs. The pipe crosses private property along a previously vacated street right-of-way. At one point, the pipe runs beneath a private structure built many years ago over the vacated street. Replacing the pipe will reduce the potential of local flooding on Carlsbad Boulevard and/or damage to the structure above the pipe as well as additional maintenance repairs. FINANCING: Purpose Design Construction Admin/Inspection Total Cost = Estimated Cost $43,000 $144,000 $31,000 $218,000 Funding Source IRF IRF IRF CBSTRMDR Page 63 CAPITAL PROJECT DESCRIPTION DRAINAGE PROJECTS - CMP REPLACEMENT PROGRAM PROJECT NAME 6607 PROJECT NO. PROJECT LOCATION MAP: VARIOUS LOCATIONS THROUGHOUT THE CITY PROJECT LOCATION: Various locations throughout the City. PROJECT DESCRIPTION: Replace CMP storm drain pipelines in need of replacement based on a review of television condition surveys. PROJECT NEED: Replace CMP storm drain pipelines with RCP or slip lining at various locations throughout the City to proactively eliminate pipeline failures. FINANCING: Purpose Design Environmental Review Construction Total Cost = Estimated Cost $240,000 $50,000 $1,940,000 $2,230,000 Funding Source IRF IRF IRF CMP_PROG Page 64 CAPITAL PROJECT DESCRIPTION DRAINAGE PROJECTS - COLLEGE BOULEVARD BRIDGE FACILITY PROJECT NAME PROJECT NO. PROJECT LOCATION MAP: LAKE CMJWERA PROJECT LOCATION: At the College Boulevard crossing of the Agua Hedionda Creek. PROJECT DESCRIPTION: Construction of a bridge structure for the College Boulevard crossing of the Agua Hedionda Creek. PROJECT NEED: The project is needed to protect College Boulevard from flood damage. FINANCING: Purpose Estimated Cost Funding Source Design/Construction $1,847,188 PLDA"B" Total Cost = $1,847,188 Collbrdg Page 65 CAPITAL PROJECT DESCRIPTION DRAINAGE PROJECTS -COLLEGE BOULEVARD / CANNON ROAD (DRAINAGE BASIN BJB1 PROJECT NAME 3636 PROJECT NO. PROJECT LOCATION MAP:PROJECT LOCATION: Within and adjacent to Calavera Creek located at the northeast corner of the Cannon Road and College Boulevard intersection. PROJECT DESCRIPTION: Construction of a 49 acre-foot drainage retention basin covering approximately 15 acres of land within and adjacent to Calavera Creek located northeast of the College Boulevard and Cannon Road intersection. The project includes construction of a 11-foot by 7-foot reinforced concrete box extending across the College Boulevard and Cannon Road intersection, a 72-inch low flow pipe draining the retention basin, a concrete spillway and rock slope protection. PROJECT NEED: This project is one of a series of projects designed to help reduce flooding along the Agua Hedionda Creek especially within the RCMHP community. The series of projects include the construction of four floodwater retention basins, including Basin BJ, Basin BJB, the Melrose Drive Basin and the Faraday Avenue basin, and the dredging and/or improvement of the Agua Hedionda and Calavera Creek channels. FINANCING: Purpose Reimbursement Reimbursement Total Cost = Estimated Cost $ 291,247 $539,663 $830,910 Funding Source PLDA "B" Fed Grant Basin-BJB Page 66 CAPITAL PROJECT DESCRIPTION DRAINAGE PROJECTS - COLLEGE BOULEVARD / CANNON ROAD (CALAVERA CREEK CHANNEL AND DRAINAGE BASIN BJ) PROJECT NAME 3636 PROJECT NO. PROJECT LOCATION MAP: PROJECT SITE ir PROJECT LOCATION: Along Calavera Creek from El Camino Real to future College Boulevard and within the Little Encinas Creek immediately east of the future College Boulevard. PROJECT DESCRIPTION: Construction of a 49 acre-foot drainage retention basin covering approximately 8 acres of land within and adjacent to the Little Encinas Creek located east of the future College Boulevard at the northeast corner of the Rancho Carlsbad Mobile Home Park (RCMHP). Included with the project is a reinforced concrete box culvert under future College Boulevard. Also included is an 84 inch storm drain pipe proposed along the north side of Cannon Road, designed to take overflow drainage from the Calavera Creek. The construction of the retention basin requires relocation of an existing RV storage lot, community garden and maintenance yard owned by the RCMHP property owners association. The proposed site of the relocated facility is north of the RCMHP and south of Cannon Road. PROJECT NEED: This project is one in a series of projects designed to help reduce flooding along the Agua Hedionda and Calavera Creeks primarily within the RCMHP community. The project also eliminates flooding of El Camino Real during a 100-year flood event. The series of projects include the construction of four floodwater retention basins, including Basin BJ, Basin BJB, the Melrose Drive Basin and the Faraday Avenue basin, and the dredging and/or improvement of the Agua Hedionda and Calavera Creek channels. FINANCING: Purpose Total Cost Total Cost = Estimated Cost $2,778,833 $2,778,833 Funding Source PLDA "B" Basin_BJ Page 67 CAPITAL PROJECT DESCRIPTION DRAINAGE PROJECTS - CYNTHIA LANE STORM DRAIN PROJECT NAME 6601 PROJECT NO. PROJECT LOCATION MAP:PROJECT LOCATION: Cynthia Lane PROJECT DESCRIPTION: Replace existing 18" CMP with a new 24" RCP. PROJECT NEED: The current drainage system is old and insufficient to convey peak storm runoff. FINANCING: Purpose Environmental Design Construction Admin/Inspection Total Cost = Estimated Cost $5,000 $25,000 $188,750 $35,000 $253,750 Funding Source IRF IRF IRF IRF CYNTHIA Page 68 CAPITAL PROJECT DESCRIPTION DRAINAGE PROJECTS - FARADAY/MELROSE DRAINAGE FACILITIES PROJECT NAME 3622 PROJECT NO. PROJECT LOCATION MAP: PROJECT PROJECT LOCATION: Within Faraday Avenue at the crossing of the Agua Hedionda Creek tributary draining the raceway properties. PROJECT DESCRIPTION: Construction of a 49 acre foot floodwater retention facility including a reinforced concrete box culvert beneath Faraday Avenue. PROJECT NEED: This project is one of a series of projects designed to help reduce flooding along the Agua Hedionda Creek especially within the RCMHP community. The series of projects include the construction of four floodwater retention basins, including Basin BJ, Basin BJB, the Melrose Drive Basin and the Faraday Avenue basin, and the dredging and/or improvement of the Agua Hedionda and Calavera Creek channels. FINANCING: Purpose Design/Construction Total Cost = Estimated Cost $300,000 $300,000 Funding Source PLDA "B" Farbasin Page 69 CAPITAL PROJECT DESCRIPTION 6600 DRAINAGE PROJECTS - HIGHLAND DRIVE BETWEEN PINE AVENUE AND BASSWOOD AVENUE PROJECT NO. PROJECT NAME PROJECT LOCATION MAP: PINE AVENUE ALTERNATIVE ALIGNMENT BASSWOOD AVENUE ALTERNATIVE ALIGNMENT PROJECT LOCATION: West side of Highland Drive between Pine Avenue and Basswood Avenue PROJECT DESCRIPTION: Construction of an 18" reinforced concrete storm drain pipe along Highland Drive from a low point at the mid-block between Pine Avenue and Basswood Avenue to a point of discharge into an existing drainage channel on either Pine Avenue or Basswood Avenue. The specific alignment will be determined after further study and analysis of potential alternative storm drain alignments. The project will include construction of catch basin, junction structures and pipe outlet improvements. PROJECT NEED: The project is needed to prevent potential flooding of private property downstream of Highland Drive. FINANCING: Purpose Design Construction Admin/Inspection Total Cost = Estimated Cost $30,000 $130,300 $35,800 $196,100 Funding Source GCC GCC GCC Highland Page 70 CAPITAL PROJECT DESCRIPTION DRAINAGE PROJECTS - KELLY DRIVE CHANNEL REPAIR PROJECT NAME 6606 PROJECT NO. PROJECT LOCATION MAP: PARK PROJECT LOCATION: Parallel to Kelly Drive east of Hillside Drive and behind the row of homes on the south side of Kelly Drive. PROJECT DESCRIPTION: Reconstruct 260' of a concrete lined trapezoidal channel and 780' of concrete slope protection. PROJECT NEED: This portion of the existing concrete channel lining is breaking apart and the underlying earth is being eroded. The erosion is undermining the remaining channel and adjacent property/backyards. FINANCING: Purpose Study/Design Environmental Construction Admin/Inspection Total Cost = Estimated Cost $263,000 $151,000 $573,000 $125,000 $1,112,000 Funding Source IRF IRF IRF . IRF KELLY DR Page 71 CAPITAL PROJECT DESCRIPTION DRAINAGE PROJECTS - LA COSTA AVENUE STORM DRAIN REPLACEMENTS PROJECT NAME 6602 PROJECT NO. PROJECT LOCATION MAP:PROJECT LOCATION: Various locations on La Costa Avenue east of El Camino Real. PROJECT DESCRIPTION: Replace old corrugated metal storm drains with reinforced concrete pipe at various locations along La Costa Avenue east of El Camino Real. PROJECT NEED: Existing corrugated metal storm drains are in very poor condition and need to be replaced in order to maintain adequate drainage. FINANCING: Purpose Design Construction Admin/Inspection Total Cost = Estimated Cost $50,000 $378,000 $64,150 $492,150 Funding Source IRF IRF IRF LaCostaSD Page 72 CAPITAL PROJECT DESCRIPTION DRAINAGE PROJECTS - MASTER DRAINAGE PLAN UPDATE PROJECT NAME 3872 PROJECT NO. PROJECT LOCATION MAP: VARIOUS LOCATIONS OF THE CITY PROJECT LOCATION: Throughout the City. PROJECT DESCRIPTION: Update the City's Master Drainage Plan (MDP) based on current growth projections, new Federal storm water quality permit requirements, the City's Habitat Management Plan (HMP) and construction and environmental mitigation cost increases. Also included is the cost to prepare and process an environmental impact report for the updated MDP. PROJECT NEED: The MDP update will help identify the need for changes to planned facilities based on the timing of growth projections and NPDES requirements. The City's MDP was last updated in 1994. Since 1994, there have been several changes to the City's growth patterns due to the HMP and HCP that impact growth projections and densities in various areas of the City. This Master Plan is necessary for identifying the facilities needed to meet Growth Management Standards. FINANCING: Purpose Studies/Reports Total Cost = Estimated Cost $454,933 $454,933 Funding Source PLDA DRNG MP Page 73 CAPITAL PROJECT DESCRIPTION DRAINAGE PROJECTS - MISCELLANEOUS MASTER DRAINAGE FACILITIES PROJECT NAME NONE PROJECT NO. PROJECT LOCATION MAP: VARIOUS LOCATIONS THROUGHOUT THE CITY MASTRDRN PROJECT LOCATION: Various locations throughout the City. PROJECT DESCRIPTION: Construction of various major storm drain facilities within the City. The facilities funded through this program are outlined in the Master Drainage and Storm Water Management Plan. PROJECT NEED: Required to meet Growth Management Standards and identified in the Master Drainage and Storm Water Quality Management Plan. FINANCING: Purpose Design/Construction Total Cost = Estimated Cost $10,936,000 $10,936,000 Funding Source PLDA Fees Page 74 CAPITAL PROJECT DESCRIPTION DRAINAGE PROJECTS - MISCELLANEOUS ROAD SUBDRAINS PROJECT NAME 3681 PROJECT NO. PROJECT LOCATION MAP:PROJECT LOCATION: Nine locations throughout Carlsbad: 1. Carlina & Hataca Road 2. Calavo Court 3. Park Drive & Cove 4. Alicante & Corte De La Vista 5. La Costa Avenue & Cadencia PROJECT DESCRIPTION: 6. Quebrada Circle 7. Linda Lane 8. Avenida Nieve 9. Circulo Adorno 10. Calle Gavanzo (east side) Preparation of an engineering study report investigating the potential causes and remedies for various surface/subsurface drainage problems occurring at the various street locations listed above. Repairs will be made to the extent funding is available. Additional funding requests will be made after more detailed cost estimates are prepared in the study report. PROJECT NEED: Based upon citizen request and maintenance staff requests. 1. Save maintenance dollars 2. Mitigates hazards from slip and falls 3. Relieve health hazards FINANCING: Purpose Design/Construction Total Cost = Estimated Cost $485,000 $485,000 Funding Source Gas Tax Misc drn Page 75 CAPITAL PROJECT DESCRIPTION DRAINAGE PROJECTS - NW QUADRANT STORM DRAIN IMPROVEMENT PROGRAM PROJECT NAME 6608 PROJECT NO. PROJECT LOCATION MAP: VARIOUS LOCATIONS IN NW QUADRANT OF THE CITY PROJECT LOCATION: Various locations in the NW Quadrant of the City. PROJECT DESCRIPTION: Construct missing sections of the NW Quadrant storm drain system. PROJECT NEED: In the infill portion of the City, older roadways were constructed without the proper storm drain improvements. The project would construct missing storm drain pipelines so the runoff is collected and transported through a complete underground drainage system. FINANCING: Purpose Design Environmental Review Construction Total Cost = Estimated Cost $466,250 $21,000 $2,808,105 $3,295,355 Funding Source GCC GCC GCC NWSD IMP Page 76 CAPITAL PROJECT DESCRIPTION DRAINAGE PROJECTS - PARK DRIVE AND TAMARACK AVENUE STORM DRAIN PROJECT NAME NONE PROJECT NO. PROJECT LOCATION MAP:PROJECT LOCATION: Along Park Drive from Monroe Street to Tamarack Avenue and along Tamarack Avenue from Park Drive to James Drive. PROJECT DESCRIPTION: Installation of approximately 2,100 linear feet of 24-inch diameter reinforced concrete storm drain pipe including access holes and other appurtenances. Identified within the Master Drainage Plan as facility "BCA". PROJECT NEED: Required to prevent flooding of properties west of Park Drive and north of Tamarack Avenue. The development of a proposed new subdivision east of Park Drive between Tamarack Avenue and Monroe Street will add the existing drainage and create a greater need for this master planned drainage facility. FINANCING: Purpose Planning/Study Construction Total Cost = Estimated Cost $100,000 $510,000 $610,000 Funding Source PLDA "B" PLDA "B" Park tam Page 77 CAPITAL PROJECT DESCRIPTION DRAINAGE PROJECTS - RIDGECREST DRAINAGE IMPROVEMENT PROJECT NAME 6603 PROJECT NO. PROJECT LOCATION MAP:PROJECT LOCATION: 3500 block of Ridgecrest Drive. PROJECT DESCRIPTION: Replace the existing corroded CMP pipe. PROJECT NEED: The existing inlet at the low point in this road clogs during storm events. The project would replace a potentially collapsed CMP in slope between Ridgecrest Drive and Celinda Drive. FINANCING: Purpose Study/Design Construction Admin/Inspection Total Cost = Estimated Cost $21 ,000 $80,500 $16,000 $117,500 Funding Source GCC GCC GCC RIDGCRST Page 78 CAPITAL PROJECT DESCRIPTION DRAINAGE PROJECTS - ROMERIA STREET DRAINAGE IMPROVEMENT PROJECT NAME 6604 PROJECT NO. PROJECT LOCATION MAP:PROJECT LOCATION: Behind properties on Romeria Street. PROJECT DESCRIPTION: Replace approximately 400 linear feet of existing trapezoidal channel and 200 linear feet of tributary ditches. H&H study is recommended to verify channel size and adequacy of culvert under La Costa Avenue. PROJECT NEED: The existing channel is badly damaged with various sinkholes which poses a safety problem. FINANCING: Purpose Study Design Environmental Construction Admin/Inspection Total Cost = Estimated Cost $30,000 $20,000 $10,000 $174,000 $40,000 $274,000 Funding Source GCC GCC GCC ROMERIA Page 79 CAPITAL PROJECT DESCRIPTION DRAINAGE PROJECTS - TAMARACK AND EL CAMINO REAL STORM DRAIN AND SILTATION BASIN PROJECT NAME NONE PROJECT NO. PROJECT LOCATION MAP:PROJECT LOCATION: At the southeast corner of Tamarack Avenue and El Camino Real. PROJECT DESCRIPTION: Reimbursement for the construction of a 45-inch and 75-inch storm drainage system together with appurtenant inlets, access holes and outlet structures. Project also includes the installation of an approximate 32,000 cubic yard siltation basin. The project facilities are identified as facilities "BF", "BFB" and Basin "BF1". PROJECT NEED: The Robertson Ranch property owners are currently processing a master plan for development of the Robertson Ranch project including the property at the southeast corner of Tamarack Avenue and El Camino Real. As a condition of development, the developer will be required to install the above-described Master Drainage Plan facilities. The cost of the facilities is expected to exceed the drainage fee obligation for the project, thus creating the potential need for reimbursement. FINANCING: Purpose Reimbursement Total Cost = Estimated Cost $1,279,000 $1,279,000 Funding Source PLDA "B" Fees TAMECRSD Page 80 SEWER PROJECTS ENCINA WATER POLLUTION CONTROL FACILITY PROJECTS FUNDING MATRIX FOR ENCINA WATER POLLUTION CONTROL FACILITY PROJECTS PROJ NO. 5800 5801 5803 FUND NO. 58001 58011 58031 PROJECT TITLE BUILDING IMPROVEMENTS CAPITAL ACQ/REPL/REHAB AND STAFFING PHASE IV EXPANSION - DEBT SERVICE PHASE V EXPANSION FUNDING SOURCE SEWER REPL SEWER REPL SEWER CONN SEWER CONN TOTAL BUDGET 4,303,491 14,812,710 8,391,591 9,968,541 FUTURE YEAR BUDGET AMOUNTS YEAR1 2007-08 696,031 935,507 1 ,647,353 YEAR 2 2008-2009 878,849 937,169 YEAR 3 2009-2010 1 ,273,982 933,006 YEAR 4 2010-2011 890,709 931,418 YEARS 2011-2012 870,775 932,468 YEAR 6-10 2012-2017 4,353,875 2,788,079 BUILDOUT 2017-2022 4,353,875 Page 81 CAPITAL PROJECT DESCRIPTION ENCINA WATER POLLUTION CONTROL FACILITY - BUILDING IMPROVEMENTS PROJECT NAME 5800 PROJECT NO. PROJECT LOCATION MAP: ( =wm AISBOBT H^ PROJECT LOCATION: Encina Water Pollution Control Facility at 6200 Avenida Encinas. PROJECT DESCRIPTION: To construct and/or improve existing building facilities at the Encina Water Pollution Control Facility. Cost represents City's pro-rated share of the building improvements. Building improvements include: • Additional Office • Employee Locker Facilities • Expanded Laboratory Facilities PROJECT NEED: Needed to provide office and laboratory facilities at the Encina Water Pollution Control Facility. FINANCING: Purpose Estimated Cost Funding Source Design/Construction $4,303,491 Sewer Replacement Total Cost = $4,303,491 ENCINA-1 Page 82 CAPITAL PROJECT DESCRIPTION ENCINA WATER POLLUTION CONTROL FACILITY - CAPITAL ACQUISITIONS REPLACEMENT/REHABILITATION PROJECT NAME 5801 PROJECT NO. PROJECT LOCATION MAP:PROJECT LOCATION: Encina Water Pollution Control Facility at 6200 Avenida Encinas. PROJECT DESCRIPTION: The funds for this project are used by the Encina Water Pollution Control Facility to develop and construct its buildout Capital Improvement Program. The cost is Carlsbad's share to cover staff, overhead, and hiring consultants to design and develop bid specifications for future capital acquisitions and the replacement / rehabilitation / construction of facilities at the sewer treatment plant. PROJECT NEED: To ensure the efficient and effective operation of Encina Water Pollution Control Facility. FINANCING: Purpose Estimated Cost Funding Source Design/Construction $14,812,710 Sewer Replacement Total Cost = $14,812,710 ENCINA-2 Page 83 CAPITAL PROJECT DESCRIPTION NONE ENCINA WATER POLLUTION CONTROL FACILITY - PHASE IV EXPANSION DEBT SERVICE PROJECT NO PROJECT NAME PROJECT LOCATION MAP:PROJECT LOCATION: South of Palomar Airport Road on the east side of Avenida Encinas. PROJECT DESCRIPTION: Expansion of the Encina Water Pollution Control Facility to increase treatment capacity from 22.5 million gallons per day to 36.0 million gallons per day of raw sewage. Cost includes bond financing and interest costs. PROJECT NEED: Required to meet Growth Management Standards and identified in the Master Plan of Sewage. FINANCING: Purpose Debt Service Total Cost = Estimated Cost Funding Source $8,391,591 Sewer Connection $8,391,591 TREATPLT Page 84 CAPITAL PROJECT DESCRIPTION ENCINA WATER POLLUTION CONTROL FACILITY - PHASE V EXPANSION PROJECT NAME 5803 PROJECT NO. PROJECT LOCATION MAP: EALQM4E ATRPOBT pr PROJECT LOCATION: Encina Water Pollution Control Facility at 6200 Avenida Encinas. PROJECT DESCRIPTION: Expand the Encina Water Pollution Control Facility to buildout for the treatment of 45-60 MGD of wastewater. Cost represents City's pro-rated share of the Phase V expansion. PROJECT NEED: To provide for ultimate wastewater treatment capacity of the Carlsbad Sewer District. FINANCING: Purpose Estimated Cost Funding Source Design/Construction $9,968,541 Sewer Connection Total Cost = $9,968,541 EWPCF-V Page 85 SEWER COLLECTION SYSTEM PROJECTS FUNDING MATRIX FOR SEWER COLLECTION SYSTEM PROJECTS PROJ NO. 5501 3622 3495 3873 3951 5500 3537 3874 3538 3809 3875 3840 5503 5504 3583 5502 3492 3886 3949 3867 3950 FUND NO. 55011 36224 34951 38731 39511 55001 35371 38741 35381 38091 38751 38401 55031 55041 35831 55021 34921 38861 39491 38671 39501 PROJECT TITLE AVENIDA ENCINAS GRAVITY SEWER BUENA INTERCEPTOR SEWER IMPROVEMENTS BUENA VISTA LIFT STATION FORCE MAIN CARLSBAD TRUNK SEWER REACHES VCT1A, VCT1B, VCT1C (SBA "A") DEMO CALAVERA HILLS TREATMENT PLANT FARADAY AVENUE - ORION TO MELROSE SEWER FOREST GRAVITY SEWER HOME PLANT - PIPELINE REPLACEMENT HOME PLANT LIFT STATION REHABILITATION LA COSTA MEADOWS SEWER EXTENSION LA GOLONDRIA SEWER EXTENSION NORTH AGUA HEDIONDA INTERCEPTOR - WEST SEGMENT NORTH AGUA HEDIONDA INTERCEPTOR REHAB - EAST SEGMENT NORTH AGUA HEDIONDA TRUNK SEWER REACH NAHT1 A NORTH BATIQUITOS INTERCEPTOR REHABILITATION NORTH BATIQUITOS SEWAGE LIFT STATION MODIFICATIONS POINSETTIA SEWAGE LIFT STATION ODOR/NOISE ABATEMENT SEWER LIFT STATION REMOVALS SEWER LIFT STATION REPAIRS AND UPGRADES SEWER LINE REFURBISHMENTS/REPLACEMENT SEWER MASTER PLAN/CONNECTION FEE UPDATE SEWER MONITORING PROGRAM SOUTH AGUA HEDIONDA LIFT STATION AND FORCE MAIN TERRAMAR LIFT STATION EMERGENCY GENERATOR VISTA/CARLSBAD INTERCEPTOR AGUA HEDIONDA LIFT STATION (VC12) VISTA/CARLSBAD INTERCEPTOR REACH VC11B VISTA/CARLSBAD INTERCEPTOR REACH VC13 TO VC15 VISTA/CARLSBAD INTERCEPTOR REHAB REACHES 1 AND 2 VISTA/CARLSBAD INTERCEPTOR REPLACEMENT REACH 3 FUNDING SOURCE SEWER REPL SEWER REPL SEWER CONN SEW BENEF SEWER REPL SEWER REPL SEWER REPL SEWER REPL SEWER REPL SEWER REPL SEWER REPL SEWER REPL SEWER REPL SEWER REPL SEWER REPL SEWER REPL SEWER REPL SEWER REPL SEWER REPL SEWER REPL SEWER REPL SEWER CONN SEW BENEF SEWER REPL SEWER CONN SEWER CONN SEWER CONN SEWER REPL SEWER CONN TOTAL BUDGET 266,963 2,340,000 1,491,978 540,965 394,000 110,200 900,000 440,000 650,000 1 ,039,520 1,001,395 4,177,751 319,244 1,863,156 1,199,000 647,193 545,000 400,000 1,360,380 5,974,600 354,200 352,000 8,827,415 205,958 9,127,159 3,549,000 13,515,200 830,975 2,688,220 FUTURE YEAR BUDGET AMOUNTS YEAR1 2007-08 500,000 23,500 829,520 347,395 1,140,000 22,000 700,000 YEAR 2 2008-2009 266,963 1,380,000 57,000 650,000 119,474 400,000 80,000 330,000 22,000 180,958 7,307,799 11,715,200 73,220 YEAR 3 2009-2010 313,500 1 ,743,682 100,000 330,000 22,000 523,000 YEAR 4 2010-2011 100,000 330,000 22,000 2,092,000 YEARS 2011-2012 103,600 100,000 330,000 354,200 22,000 YEAR 6-10 2012-2017 437,365 400,000 1 ,650,000 110,000 BUILDOUT 2017-2022 1,491,978 604,600 88,000 Page 86 CAPITAL PROJECT DESCRIPTION SEWER COLLECTION SYSTEM - AVENIDA ENCINAS GRAVITY SEWER PROJECT NAME 3581 PROJECT NO. PROJECT LOCATION MAP: PROJECT AREA PROJECT LOCATION: Along north side of Lanakai Mobile Home Park. PROJECT DESCRIPTION: Replace approximately 1,000 feet of 8" gravity sewer. PROJECT NEED: The existing forcemain releases unacceptable levels of hydroden sulfide gas resulting in numerous odor complaints and deterioration of the gravity sewer system. FINANCING: Purpose Design/Admin/lnsp Construction Total Cost = Estimated Cost Funding Source $61,250 $205,713 $266,963 Sewer Replacement Sewer Replacement Avencsew Page 87 CAPITAL PROJECT DESCRIPTION 5501 SEWER COLLECTION SYSTEM - BUENA INTERCEPTOR SEWER IMPROVEMENTS PROJECT NO. PROJECT NAME PROJECT LOCATION MAP: ROJECT (BUENA INTERCEPTOR) PROJECT LOCATION: Buena Interceptor Sewer from El Camino Real to the Encina Wastewater Treatment Plant. PROJECT DESCRIPTION: The Buena Interceptor Sewer conveys wastewater for the cities of Carlsbad and Vista. The existing system capacity is inadequate for projected future flows. The project will be mitigated with an alignment and capacity studies with an alternatives analysis. PROJECT NEED: Required to meet future sewer drainage basin flows. Also required pursuant to the Carlsbad/Buena Sanitation Agreement. FINANCING: Purpose Studies Design Environmental Construction Admin/Inspection Total Cost = Estimated Cost Funding Source $100,000 $104,000 $80,000 $1,880,000 $176,000 $2,340,000 Sewer Replacement Sewer Replacement Sewer Replacement Sewer Replacement Sewer Replacement BUENAJNT Page 88 CAPITAL PROJECT DESCRIPTION SEWER COLLECTION SYSTEM - BUENA VISTA LIFT STATION FORCE MAIN (VC-4) PROJECT NAME NONE PROJECT NO. PROJECT LOCATION MAP:PROJECT LOCATION: Along the south shore of the Buena Vista Lagoon between the Buena Vista Lift Station and 1-5. PROJECT DESCRIPTION: Replace existing 16" pipeline with 24" pipeline to provide dual 24" force mains. PROJECT NEED: Increase capacity of sewer force main system to accommodate future sewer generation. FINANCING: Purpose Design Environmental Construction Admin/Inspection Total Cost = Estimated Cost Funding Source $75,000 $125,000 $1,191,978 $100,000 $1,491,978 Sewer Connection Fees Sewer Connection Fees Sewer Connection Fees Sewer Connection Fees Buenlift Page 89 CAPITAL PROJECT DESCRIPTION NONE SEWER COLLECTION SYSTEM - CARLSBAD TRUNK SEWER REACHES VCT1A. VCT1B. VCT1C PROJECT NAME PROJECT NO. PROJECT LOCATION MAP:PROJECT LOCATION: From Vancouver Street and Simsbury Court within Calavera Hills north to the Vista Carlsbad Trunkline located adjacent to Highway 78. PROJECT DESCRIPTION: Construct 1,000 feet of 8-inch diameter sewer, 2,000 feet of 10-inch diameter sewer, and 3,000 feet of 12-inch diameter sewer. PROJECT NEED: As Calavera Hills developed, several temporary sewage lift stations were constructed due to a lack of existing facilities downstream of the project sites. At the time, it was anticipated that the downstream properties would develop in a timely fashion negating any need for long-term maintenance of the temporary lift stations. The two listed stations are aging and in need of increased repair and maintenance. In lieu of expending the additional funds to upgrade temporary stations, staff is proposing completing the extension of the gravity lines from the stations to the existing Vista Carlsbad Trunk Line sewer. The lift stations would then be abandoned and removed. FINANCING: Purpose Estimated Cost Funding Source Land Acquisition Design Construction Total Cost = $20,000 $80,000 $440,965 $540,965 Sewer Benefit Zone Fee Sewer Benefit Zone Fee Sewer Benefit Zone Fee VCT1ABC Page 90 CAPITAL PROJECT DESCRIPTION SEWER COLLECTION SYSTEM - DEMOLITION OF CALAVERA HILLS TREATMENT PLANT PROJECT NAME 5507 PROJECT NO. PROJECT LOCATION MAP: PROJECT SITE PROJECT LOCATION: Northwest of Tamarack Avenue between Pontiac Drive and Carlsbad Village Drive. PROJECT DESCRIPTION: Study and propose a demolition plan for the existing Calavera Hills Sewer Treatment Plant. PROJECT NEED: The existing Calavera Hills Sewer Treatment Plant is now obsolete due to the full upgrade of the Encina Wastewater Treatment Facility. The project is needed because the facility has been abandoned, buildings and tanks are in disrepair, and the site is considered an attractive nuisance. FINANCING: Purpose Study $23,500 Design $36,000 Environmental Review $21,000 Construction $313,500 Total Cost = $394,000 Estimated Cost Funding Source Sewer Capital Replacement Sewer Capital Replacement Sewer Capital Replacement Sewer Capital Replacement DEMCALHIL Page 91 CAPITAL PROJECT DESCRIPTION SEWER COLLECTION SYSTEM - FOREST GRAVITY SEWER PROJECT NAME 3495 PROJECT NO. PROJECT LOCATION MAP: SEWER ALIGNMENT "A" PROJECT LOCATION: Along Forest Avenue at Highland Drive. PROJECT DESCRIPTION: Abandon sewage lift station and construct gravity sewer. PROJECT NEED: Existing lift station does not meet current electrical and ventilation safety requirements, and wet well and mechanical equipment need replacement. Sewer pipeline eliminates need for upgrade of facility. FINANCING: Purpose Design Construction Admin/Inspection Total Cost = Estimated Cost Funding Source $100,000 $700,000 $100,000 $900,000 Sewer Replacement Sewer Replacement Sewer Replacement Forststa Page 92 CAPITAL PROJECT DESCRIPTION SEWER COLLECTION SYSTEM - HOME PLANT LIFT STATION PROJECT NAME 3873 PROJECT NO. PROJECT LOCATION MAP: \ PACIFIC OCEAN PROJECT LOCATION: Home Plant Lift Station near Carlsbad Boulevard and northern City limits. PROJECT DESCRIPTION: Replace pumps, upgrade wetwell and manifold piping, relocate wetwell ventilation system, reconstruct influent sewer manhole, and replace 260 feet of 15-inch gravity sewer pipeline. PROJECT NEED: Field review shows that sand accumulating in the wet well is due to undersized pumps. Installing larger pumps, replacing existing pipeline, and completing the other upgrades will reduce the maintenance costs at the pump station. FINANCING: Purpose Design Construction Admin/Inspection Total Cost = Estimated Cost $50,000 $1,000,000 $40,000 $1,090,000 Funding Source Sewer Replacement Sewer Replacement Sewer Replacement Homeplnt Page 93 CAPITAL PROJECT DESCRIPTION SEWER COLLECTION SYSTEM - LA COSTA MEADOWS SEWER EXTENSION PROJECT NAME 3951 PROJECT NO. PROJECT LOCATION MAP:PROJECT LOCATION: In La Costa from the end of Chorlito Street to El Fuerte Street. PROJECT DESCRIPTION: Removal of the La Costa Meadows Lift Station and extension of an eight-inch gravity sewer approximately 600 feet to the new gravity sewer constructed in El Fuerte Street by the Rancho Carrillo project developer. PROJECT NEED: The La Costa Meadows Lift Station was constructed to temporarily divert sewage flows into existing Leucadia County Water District (LCWD) facilities. The diversion was required due to a lack of City sewer facilities located downstream of the La Costa Meadows project within the Rancho Carrillo Valley. The "diversion" agreement between the City and LCWD required the abandonment of the lift station and connection to City sewer facilities when the downstream properties were developed and new sewer facilities extended up El Fuerte Street. The needed downstream sewer collection facilities were recently constructed as part of the Rancho Carrillo project. FINANCING: Purpose Acquisition Design Environmental Construction Admin/Inspection Total Cost = Estimated Cost Funding Source $10,000 $33,000 $83,000 $823,200 $90,320 $1,039,520 Sewer Replacement Sewer Replacement Sewer Replacement Sewer Replacement Sewer Replacement Lcmeadow Page 94 CAPITAL PROJECT DESCRIPTION SEWER COLLECTION SYSTEM - LA GOLONDRINA SEWER EXTENSION PROJECT NAME 5500 PROJECT NO. PROJECT LOCATION MAP:PROJECT LOCATION: In La Costa from the end of La Golondrina Street north of Poinsettia Lane. PROJECT DESCRIPTION: Removal of the La Golondrina Lift Station and extension of an eight-inch diameter gravity sewer approximately 1,000 feet to the new gravity sewer constructed in Poinsettia Lane by the Rancho Carrillo project developer. PROJECT NEED: The La Costa Golondrina Lift Station was constructed to temporarily divert sewage flows into existing Leucadia County Water District (LCWD) facilities. The diversion was required due to a lack of City sewer facilities located downstream of the Ponderosa Homes project within the Rancho Carrillo Valley. The "diversion" agreement between City and LCWD require the abandonment of the lift station and connection to City sewer facilities when the downstream properties were developed and new sewer facilities extended up the future Poinsettia Lane. The needed downstream sewer collection facilities were recently completed as part of the Rancho Carrillo project. FINANCING: Purpose Planning/Study Land Acquisition Environmental Design Construction Admin/Inspection Total Cost = Estimated Cost Funding Source $10,000 $20,000 $31,610 $98,000 $742,350 $99,435 $1,001,395 Sewer Replacement Sewer Replacement Sewer Replacement Sewer Replacement Sewer Replacement Sewer Replacement La_golon Page 95 CAPITAL PROJECT DESCRIPTION SEWER COLLECTION SYSTEM - NORTH AGUA HEDIONDA INTERCEPTOR REHABILITATION - EAST SEGMENT EL CAMINO REAL TO KELLY DRIVE PROJECT NAME 3874 PROJECT NO. PROJECT LOCATION MAP:PROJECT LOCATION: North bank of Agua Hedionda Lagoon and Creek, from El Camino Real and Cannon Road intersection to the Kelly Drive/Cove Drive intersection. PROJECT DESCRIPTION: • Replace/rehabilitate 21 access holes. • Conduct environmental survey and prepare documents necessary to obtain permits. PROJECT NEED: Implementation of the project will avoid accidental sewage spill to the lagoon and creek, and reduce inflow to the sewer. FINANCING: Purpose Environmental/Design Construction Total Cost = Estimated Cost $10,000 $219,244 $319,244 Funding Source Sewer Replacement Sewer Replacement Naguaecr Page 96 CAPITAL PROJECT DESCRIPTION SEWER COLLECTION SYSTEM - NORTH AGUA HEDIONDA INTERCEPTOR REHABILITATION - WEST SEGMENT COVE DRIVE TO HOOVER STREET PROJECT NAME 3537 PROJECT NO. PROJECT LOCATION MAP:PROJECT LOCATION: North bank of Agua Hedionda Lagoon and Creek, from Cove Drive to Hoover Street. PROJECT DESCRIPTION: • Design and construct access road and shoreline protection wall to facilitate gravity sewer maintenance from Cove Drive to Hoover Street. • Design and construct erosion protection for access road and existing gravity sewer where needed. • Replace 700 linear feet of 24-inch diameter sewerline. • Replace/rehabilitate 19 access holes. • Conduct environmental survey and prepare Environmental Impact Report necessary to obtain permits. • Design and construct mitigation site. PROJECT NEED: Implementation of the project will avoid accidental sewage spill to the lagoon and creek, reduce inflow to the sewer, and allow for maintenance vehicles to access the sewer. FINANCING: Purpose Study Environmental Property Acquisition Design Construction Estimated Cost $24,599 $829,808 $45,000 $199,916 $3,078,427 Funding Source Sewer Replacement Sewer Replacement Sewer Replacement Sewer Replacement Sewer Replacement Total Cost = $4,177,750 Annual Operating Cost = $5,000 Page 97 NAI_west CAPITAL PROJECT DESCRIPTION SEWER COLLECTION SYSTEM - NORTH AGUA HEDIONDA TRUNK SEWER REACH NAHT1A PROJECT NAME NONE PROJECT NO. PROJECT LOCATION MAP:PROJECT LOCATION: Along the north side of Tamarack Avenue from El Camino Real to Calavera Hills Treatment Plant. PROJECT DESCRIPTION: Remove existing forcemain and construct 5,000 feet of 8-inch diameter gravity sewer pipeline. PROJECT NEED: When the Calavera Hills Sewer Treatment Plant was initially constructed, there was no provision for extending a gravity sewer line downstream of the plant. When the decision was made not to activate the plant, the sewer mains discharging into the plant site were connected to force main pipe which was originally intended to carry flow up to the plant from projects located downstream of the plant. The existing force main is not sloped properly to handle gravity flow and lacks the necessary access holes for proper maintenance. Removal of the existing force main and construction of a new gravity line will complete this portion of the Sewer Master Plan. FINANCING: Purpose Planning/Study Design Construction Admin/Inspection Total Cost = Estimated Cost Funding Source $58,000 $100,000 $1,605,156 $100,000 $1,863,156 Sewer Replacement Sewer Replacement Sewer Replacement Sewer Replacement NAHT1A Page 98 CAPITAL PROJECT DESCRIPTION SEWER COLLECTION SYSTEM - NORTH BATIQUITOS INTERCEPTOR REHABILITATION PROJECT NAME 3538 PROJECT NO. PROJECT LOCATION MAP:PROJECT LOCATION: North side of Batiquitos Lagoon from El Camino Real west to North Batiquitos Lift Station. PROJECT DESCRIPTION: During high rainfall periods, the Batiquitos Lagoon level rises to flood above the existing access road and access hole covers. The project will design a new access road to the sewer and raise access hole covers to a higher elevation where required. PROJECT NEED: To avoid accidental sewage spill, reduce inflow to the sewer, and allow for maintenance vehicles to access the sewer. FINANCING: Purpose Estimated Cost Funding Source Design Environmental Land Acquisition Construction Admin/Inspection Total Cost = $270,000 $80,000 $30,000 $719,000 $100,000 $1,199,000 Sewer Replacement Sewer Replacement Sewer Replacement Sewer Replacement Sewer Replacement Nbatint Page 99 CAPITAL PROJECT DESCRIPTION 3809 SEWER COLLECTION SYSTEM - NORTH BATIQUITOS SEWAGE LIFT STATION MODIFICATIONS PROJECT NO. PROJECT NAME PROJECT LOCATION MAP: PROJECT SITE PROJECT LOCATION: End of Gabbiano Lane. PROJECT DESCRIPTION: Replace miscellaneous equipment damaged by corrosion. Provide structural modifications to dry well and wet well. Modify mechanical and electrical systems as needed to eliminate failures. Provide color study and necessary HVAC and odor control modifications. PROJECT NEED: Existing structure does not allow wet well to be cleaned out. Existing structure needs openings to allow lift station pumps to be removed. Existing electrical system needs to be modified to stop pumps from locking out unnecessarily. FINANCING: Purpose Design Construction Admin/Inspection Total Cost = Estimated Cost Funding Source $124,880 $469,313 $53,000 $647,193 Sewer Replacement Sewer Replacement Sewer Replacement Northbat Page 100 CAPITAL PROJECT DESCRIPTION 3875 SEWER COLLECTION SYSTEM - POINSETTIA SEWAGE LIFT STATION ODOR AND NOISE ABATEMENT PROJECT NAME PROJECT NO. PROJECT LOCATION MAP:PROJECT LOCATION: 2425 Poinsettia Lane - Poinsettia Sewage Lift Station. PROJECT DESCRIPTION: Installation of an activated carbon adsorption odor control system, including ducting, to treat foul air from the lift station wetwell to reduce corrosion and control odor emissions, and sound enclosures for outdoor fans. PROJECT NEED: The existing lift station emits odors that can reach future developments in close proximity to the lift station. In addition, uncovered supply and exhaust fans generate noise that reach or exceed 60 dBa at the fenceline. Control of the odors and reduction of noise will promote "good neighbor" policy and a higher level of service to adjacent residents. FINANCING: Purpose Estimated Cost Design $60,000 Construction $465,000 Admin/Inspection $20,000 Total Cost = $545,000 Annual Operating Cost = $11,000 Funding Source Sewer Replacement Sewer Replacement Sewer Replacement Poinlift Page 101 CAPITAL PROJECT DESCRIPTION SEWER COLLECTION SYSTEM - SEWER LIFT STATION REMOVALS PROJECT NAME NONE PROJECT NO. PROJECT LOCATION MAP: VANCOUVER VILLAS PROJECT LOCATION: • Vancouver • Simsbury • Villas • Gateshead PROJECT DESCRIPTION: Remove existing lift stations and construct new gravity sewer. PROJECT NEED: Identified in 2003 Sewer Master Plan Update. Removal of lift stations will reduce maintenance and operation costs. FINANCING: Purpose Design/Admin/lnsp Construction Total Cost = Estimated Cost Funding Source $100,000 $300,000 $400,000 Sewer Replacement Sewer Replacement Rem_lift2 Page 102 CAPITAL PROJECT DESCRIPTION 3840 SEWER COLLECTION SYSTEM - SEWER LIFT STATION - MISCELLANEOUS REPAIRS & UPGRADES PROJECT NAME PROJECT NO. PROJECT LOCATION MAP:PROJECT LOCATION: Villas, Terramar and Gateshead sewer lift stations. PROJECT DESCRIPTION: Repair and upgrade various sewer lift stations throughout the City. Repairs include replacing existing malfunctioning alarm dialers at the Home Plant and Villas Sewer Lift Stations; replacing old pumps at the Terramar, Villas and Gateshead Sewer Lift Stations; replacing existing gas monitoring units, and the wet well lining at the Villas Sewer Lift Station. PROJECT NEED: These projects are needed to properly maintain the existing sewer lift stations and prevent potential sewage spills. Many of the existing stations are 15 years or older and require periodic upgrades and/or replacement of pumps and electrical systems to increased maintenance costs. FINANCING: Purpose Design Construction Admin/Inspection Total Cost = Estimated Cost Funding Source $40,000 $1,275,380 $45,000 $1,360,380 Sewer Replacement Sewer Replacement Sewer Replacement Sewerlft Page 103 CAPITAL PROJECT DESCRIPTION SEWER COLLECTION SYSTEM - SEWER LINE REFURBISHMENT/REPLACEMENT PROJECT NAME 3927 & 5503 PROJECT NO. PROJECT LOCATION MAP: VARIOUS LOCATIONS THROUGHOUT THE CITY PROJECT LOCATION: Various locations within the City sewer limits. PROJECT DESCRIPTION: Clean and refurbish existing sewer lines older than 30 years or replace if not able to refurbish. The sewer lines needing repair will be determined by yearly TV inspection. PROJECT NEED: Maintain system in good condition to avoid major problems. FINANCING: Purpose Estimated Cost Funding Source Design/Construction $5,974,600 Sewer Replacement Total Cost = $5,974,600 SEWERLNE Page 104 CAPITAL PROJECT DESCRIPTION SEWER COLLECTION SYSTEM - MASTER PLAN/CONNECTION FEE UPDATE PROJECT NAME NONE PROJECT NO. PROJECT LOCATION MAP: LOCATIONS THROUGHOUT THE CITY Mstrplan PROJECT LOCATION: Throughout the City. PROJECT DESCRIPTION: Update the City's 2003 Sewer Master Plan based on anticipated growth projections. PROJECT NEED: The Master Plan update will help identify the need for changes to planned facilities based on the timing of growth projections and Growth Management Standards. FINANCING: Purpose Report/Admin Total Cost = Estimated Cost Funding Source $354,200 Sewer Replacement $354,200 Page 105 CAPITAL PROJECT DESCRIPTION SEWER COLLECTION SYSTEM - SEWER MONITORING PROGRAM PROJECT NAME 3952 & 5504 PROJECT NO. PROJECT LOCATION MAP: N/A PROJECT LOCATION: Citywide within the City's sewer service area. PROJECT DESCRIPTION: Monitor sewer flows and remaining capacities in lines and pump stations within the Carlsbad sewer service area. Perform sewer flow measurements when required. Update Sewer Master Plan and review adequacy of sewer fees as required. PROJECT NEED: To ensure that sewer flows do not exceed line capacity and to ensure timely upgrades of sewer systems in conformance with the Growth Management Standards. FINANCING: Purpose Monitoring Total Cost = Estimated Cost Funding Source $352,000 Sewer Connection $352,000 Page 106 SEWERMON CAPITAL PROJECT DESCRIPTION SEWER COLLECTION SYSTEM - SOUTH AGUA HEDIONDA LIFT STATION AND FORCE MAIN PROJECT NAME 3583 & 3828 PROJECT NO. PROJECT LOCATION MAP:PROJECT LOCATION: Along Cannon Road from Armada Drive to El Camino Real. PROJECT DESCRIPTION: Construct 350 HP sewage lift station and force main in Cannon Road Reaches SAH1.SAH2, andSAHS. PROJECT NEED: To provide sewer service to those areas generally tributary to the south side of Agua Hedionda Lagoon. FINANCING: Purpose Estimated Cost Funding Source Planning, Permitting & Design $1,500,000 Sewer Benefit Area Fee Construction $7,327,415 Sewer Benefit Area Fee Total Cost = $8,827,415 Annual Operating Cost = $435,000 SOAGPHll Page 107 CAPITAL PROJECT DESCRIPTION SEWER COLLECTION SYSTEM - TERRAMAR LIFT STATION EMERGENCY GENERATOR PROJECT NAME 5502 PROJECT NO. PROJECT LOCATION MAP: TERRAMAR LIFT STATION PROJECT LOCATION: The existing lift station is located approximately 500 feet west of the railroad right-of-way on the north side of Cannon Road. PROJECT DESCRIPTION: Construct approximately 500 linear feet of sewer pipeline from the lift station to the Vista/Carlsbad interceptor or install a standby generator. PROJECT NEED: Currently, the Terramar Lift Station has no redundancy for electric power outages. Staff responds by bringing a portable generator to the site. Installation of an emergency overflow pipe system or emergency generator will diminish risk of sewer spills. FINANCING: Purpose Design/Studies Construction Admin/Inspection Total Cost = Estimated Cost $20,200 $161,758 $24,000 $205,958 Funding Source Sewer Replacement Sewer Replacement Sewer Replacement TERRAMAR Page 108 CAPITAL PROJECT DESCRIPTION SEWER COLLECTION SYSTEM - VISTA/CARLSBAD INTERCEPTOR AGUA HEDIONDA LIFT STATION (VC 12) PROJECT NAME 3492 PROJECT NO. PROJECT LOCATION MAP: SITE PROJECT LOCATION: On the south shore of Agua Hedionda Lagoon adjacent to the east side of the railroad tracks. PROJECT DESCRIPTION: Upgrade existing pump station to increase capacity for buildout conditions. Replace existing pumps with larger capacity pumps and associated appurtenances. Carlsbad shares the total cost of the project with the City of Vista at a 50/50% share. PROJECT NEED: Required to handle sewage flows for buildout population. FINANCING: Purpose Environmental Design Construction Estimated Cost Funding Source $508,800 $610,600 $8,007,759 Sewer Connection Fee Sewer Connection Fee Sewer Connection Fee Total Cost = $9,127,159 "Includes Vista's share of costs. Annual Operating Cost = $149,000 Agualift Page 109 CAPITAL PROJECT DESCRIPTION 3886 SEWER COLLECTION SYSTEM - VISTA/CARLSBAD INTERCEPTOR SEWER REACH VC11B PROJECT NAME PROJECT NO. PROJECT LOCATION MAP: PACIFIC OCEAN ENCINA WATER V POLLUTION CONTROL FACILITY PROJECT LOCATION: Along NCTD railroad right-of-way from Olive Avenue south across Agua Hedionda Lagoon to the Agua Hedionda Lift Station. PROJECT DESCRIPTION: Replace existing Vista/Carlsbad Interceptor Sewer Reach VC11B and bridge (wood trestle) with 800 feet of 54-inch pipeline and a new concrete bridge. Project cost is shared with the City of Vista. PROJECT NEED: Required to handle buildout flows by replacing existing pipeline and the wood bridge. FINANCING: Purpose Environmental Design Property Acquisition Construction Estimated Cost Funding Source $100,000 $200,000 $14,000 $3,235,000 $3,549,000 Sewer Connection Fee Sewer Connection Fee Sewer Connection Fee Sewer Connection Fee Total Cost = *Cost includes Vista's share of costs. Annual Operating Cost = $568 SEWVC11B Page 110 CAPITAL PROJECT DESCRIPTION 3949 SEWER COLLECTION SYSTEM - VISTA/CARLSBAD INTERCEPTOR SEWER REACHES VC13 TO VC15 PROJECT NO. PROJECT NAME PROJECT LOCATION MAP: PACIFIC OCEAN PROJECT ENCINA WATER POLLUTION CONTROL FACILITY PROJECT LOCATION: From the Agua Hedionda Lift Station south to the Encina Water Pollution Control Facility. PROJECT DESCRIPTION: Replace existing Vista/Carlsbad Interceptor Sewer Reaches VC13 to VC15 with a 54" pipeline. Project cost is shared with the City of Vista. PROJECT NEED: Required to handle buildout flows and deteriorated pipelines. FINANCING: Purpose Estimated Cost Funding Source Design Construction Total Cost = $700,000 Sewer Connection Fees $12,815,200 Sewer Connection Fees $13,515,200 * *Cost includes Vista's share. VC13VC15 Page 111 CAPITAL PROJECT DESCRIPTION SEWER COLLECTION SYSTEM - VISTA/CARLSBAD INTERCEPTOR SEWER REHABILITATION REACHES 1 THRU 3 PROJECT NAME 3867 & 3950 PROJECT NO. PROJECT LOCATION MAP: PROJECT PROJECT LOCATION: Reaches 1, 2 and 3 of the Vista/Carlsbad Interceptor Sewer located south of Highway 78 from Jefferson Street to the City limits. PROJECT DESCRIPTION: Reaches 1, 2 and 3 of the Vista/Carlsbad (V/C) 36" Ductile Iron Interceptor and manholes have corroded significantly. VC1 and 2 will be lined with PVC and manholes will be rehabilitated. VC3 will be completely replaced. V/C interceptor is jointly owned by the City of Vista and the City of Carlsbad. Through a joint City agreement, Carlsbad is responsible for 15% of the cost for maintenance and improvements to Reaches 1, 2 and 3. The City of Vista is responsible for managing projects within these reaches. Costs below reflect the City of Carlsbad's share of project. PROJECT NEED: Increase safety: Pipeline and manholes have been determined to be in poor condition. Risk of pipeline failure and sewage spill in environmentally sensitive area exists. Unmet needs: Manholes are currently unlined. Concrete is exposed to hydrogen sulfide environment. Lining will increase longevity of the manhole. Lining of pipeline will reduce ground water infiltration into the wastewater system. FINANCING: Purpose Design/Construction Construction Estimated Cost Funding Source $830,975 $2,688,200 Sewer Replacement Sewer Connection Total Cost = $3,519,175* *Cost includes Administration and Inspection costs. VCinterc Page 112 WA TER PROJECTS WATER DISTRIBUTION SYSTEM PROJECTS FUNDING MATRIX FOR WATER DISTRIBUTION SYSTEM PROJECTS PROJ NO. 3954 3376 3376 3842 5000 5001 3955 3446 5003 5002 3843 3911 3912 3816 3913 3900 3622 3903 3821 5005 5004 5004 3904 3822 3531 3910 3910 FUND NO. 39541 33762 33761 38421 50001 50011 39551 34461 50031 50021 38431 39111 39121 38161 39131 39001 36223 39031 38211 50051 50042 50041 39041 38221 35311 39102 39101 PROJECT TITLE •D" RESERVOIR - BLACKRAIL ROAD IMPROVEMENTS "D" RESERVOIR - PHASE II "D" RESERVOIR - PHASE II AVIARA PARKWAY AT PLUM TREE CALAVERA HILLS WATER BOOSTER STATION STANDBY GENERATOR CANNON ROAD EAST OF EL CAMINO REAL - Reimb CARLSBAD BOULEVARD - SOUTH OF AVENIDA ENCINAS CATHODIC PROTECTION PROGRAM COLLEGE BOULEVARD - CANNON TO BADGER LANE COLLEGE BOULEVARD (ECR TO CANNON ROAD) - Reimb COLLEGE BOULEVARD- MAERKLE RESERVOIR TO AGUA HEDIONDA CREEK CRESTVIEW DRIVE TRANSMISSION MAIN DEMOLITION OF WATER FACILITIES AT PAJAMA DRIVE DESALINATION GROUNDWATER/SEAWATER STUDY EL CAMINO REAL - PALOMAR AIRPORT ROAD SOUTH EL CAMINO REAL BETWEEN COLLEGE AND JACKSPAR EL CAMINO REAL CROSSING AT KELLY DRIVE EL CAMINO REAL TRANSMISSION MAIN FROM FARADAY TO COUGAR DRIVE EL CAMINO REAL/CARLSBAD VILL DR PIPELINE REPL. EL FUERTE - NORTH OF LOKER - Reimb EL FUERTE - ALGA ROAD TO POINSETTIA LANE - Reimb EL FUERTE - POINSETTIA LANE TO PALOMAR AIRPORT ROAD - Reimb EL FUERTE AND CORINTIA STREET ELLERY WATER PUMP PROJECT FARADAY AVENUE - ORION TO MELROSE WATERLINE - Reimb FARADAY AVENUE EXTENSION - Reimb FOUSSAT ROAD WELL ABANDONMENT LAKE CALAVERA RESERVOIR IMPROVEMENTS MAERKLE DAM FLOATING COVER DRAINPIPE REPLACE. MAERKLE PUMP STATION IMPROVEMENTS MAERKLE PUMP STATION IMPROVEMENTS MAERKLE RESERVIOUR BRIDGE REPLACEMENT MAERKLE RESERVOIR STORAGE (TAP #2) MARRON ROAD - PRESSURE REGULATING STATION TO OCEANSIDE MASTER PLAN UPDATE MELROSE DRIVE - PALOMAR AIRPORT ROAD TO FARADAY - Reimb MISCELLANEOUS PIPELINE REPLACEMENT PROJECTS MISCELLANEOUS WATER RESERVOIR FENCING OCEANSIDE INTERTIE UPGRADE PAR/ECR PUMP STATION PAR/ECR PUMP STATION FUNDING SOURCE WATER REPL WATER CONN WATER REPL WATER REPL WATER CONN WATER CONN WATER REPL WATER REPL WATER CONN WATER CONN WATER REPL WATER REPL WATER REPL WATER REPL WATER REPL WATER CONN WATER CONN WATER REPL WATER REPL WATER CONN WATER CONN WATER CONN WATER REPL WATER REPL WATER CONN WATER CONN WATER REPL WATER REPL WATER REPL WATER CONN WATER REPL WATER REPL WATER CONN WATER CONN WATER CONN WATER CONN WATER REPL WATER REPL WATER REPL WATER CONN WATER REPL TOTAL BUDGET 367,000 6,193,311 2,064,365 459,612 468,817 760,800 886,171 1 ,246,700 746,949 487,436 3,758,520 150,519 95,500 719,260 3,225,000 971,275 725,000 774,100 269,975 148,750 2,000,000 1,141,000 156,272 205,900 97,210 749,773 202,500 6,646,908 200,000 747,100 747,100 201 ,250 13,762,757 741,221 47,800 796,300 1 ,847,051 197,399 110,700 997,350 990,350 FUTURE YEAR BUDGET AMOUNTS YEAR1 2007-08 624,000 * 35,500 145,000 549,673 28,750 77,000 YEAR 2 2008-2009 475,800 487,436 376,560 749,773 172,500 47,800 796,300 418,400 YEAR 3 2009-2010 52,300 146,900 2,886,960 428,651 110,700 YEAR 4 2010-2011 459,612 416,517 886,171 746,949 31 ,380 156,272 13,762,757 YEARS 2011-2012 119,139 YEAR 6-10 2012-2017 6,193,311 2,064,365 719,260 692,675 692,675 BUILDOUT 2017-2022 741,221 Page 113 FUNDING MATRIX FOR WATER DISTRIBUTION SYSTEM PROJECTS (Continued) PROJ NO. 3858 3923 3956 3915 3664 FUND NO. 38581 39231 39561 39151 36641 PROJECT TITLE POINSETTIA LANE - EL CAMINO REAL TO SKIMMER CT (Reimb) POINSETTIA LANE - SKIMMER CT TO CASSIA POINSETTIA LANE - SKIMMER CT TO CASSIA POINSETTIA LANE EAST OF BLACK RAIL ROAD 12" POINSETTIA LANE EAST OF BLACK RAIL ROAD 12" PRESSURE REDUCING STATION - SYCAMORE CREEK RANCHO CARRILLO OVERSIZING/EXTENSION RANCHO SANTA FE RD PIPELINE REPLACEMENT SAN MARCOS BOULEVARD WEST OF SDCWA TANGLEWOOD PRESSURE REDUCING STATION REPLACEMENT WATER SYSTEM INTERTIE CONNECTION FUNDING SOURCE WATER CONN WATER REPL WATER CONN WATER CONN WATER REPL WATER CONN WATER CONN WATER REPL WATER REPL WATER REPL WATER REPL TOTAL BUDGET 121,478 472,583 370,610 222,691 222,583 121,478 93,700 773,000 3,091 ,241 354,750 439,000 FUTURE YEAR BUDGET AMOUNTS YEAR1 2007-08 YEAR 2 2008-2009 YEAR 3 2009-2010 YEAR 4 2010-2011 YEARS 2011-2012 YEAR 6-10 2012-2017 121,478 472,583 370,610 222,691 222,583 121,478 BUILDOUT 2017-2022 Page 114 CAPITAL PROJECT DESCRIPTION 3954 WATER DISTRIBUTION SYSTEM PROJECTS - "D" RESERVOIR - BLACK RAIL ROAD IMPROVEMENTS PROJECT NO. PROJECT NAME PROJECT LOCATION MAP: PROJECT PROJECT LOCATION: Black Rail Road segment adjacent to "D" Tank Reservoir. PROJECT DESCRIPTION: Black Rail Road improvements include paving, base, sidewalks, curb and gutter, grading, retaining wall, and undergrounding of existing utilities. PROJECT NEED: The Black Rail Road improvements fronting the "D" Tank Reservoir are required by CUP 03-15. FINANCING: Purpose Design Construction Admin/Inspection Total Cost = Estimated Cost $28,000 $314,500 $24,500 $367,000 Funding Source Water Replacement Water Replacement Water Replacement Blackrail Page 115 CAPITAL PROJECT DESCRIPTION WATER DISTRIBUTION SYSTEM - "D" RESERVOIR PHASE II PROJECT NAME 3376 PROJECT NO. PROJECT LOCATION MAP:PROJECT LOCATION: Adjacent to existing "D" Reservoir. PROJECT DESCRIPTION: Construct new 8.5 MG water reservoir to service 375 Zone. PROJECT NEED: Provide additional daily storage within the distribution system for ultimate demands. FINANCING: Purpose Construction Construction Total Cost = Estimated Cost Funding Source $6,193,311 $2,064,365 $8,257,676 Water Connection Water Replacement D_Resll Page 116 CAPITAL PROJECT DESCRIPTION WATER DISTRIBUTION SYSTEM - AVIARA PARKWAY PROJECT NAME NONE PROJECT LOCATION MAP: PROJECT NO. #19 PROJECT LOCATION: Aviara Parkway at Plum Tree, north to Mariposa Street, then east to Sapphire Drive. PROJECT DESCRIPTION: Construct 3,100 feet of 8-inch watermain. PROJECT NEED: Provide redundant supply to residential development. FINANCING: Purpose Estimated Cost Funding Source Construction Adm/Design/lnsp Total Cost = $362,612 $97,000 $459,612 Water Replacement Water Replacement Aviara Page 117 CAPITAL PROJECT DESCRIPTION WATER DISTRIBUTION SYSTEM - CALAVERA HILLS WATER BOOSTER STATION STANDBY GENERATOR PROJECT NAME 3842 PROJECT LOCATION MAP: CITY OF_OCEANSinE CITY OfCARLSBAD LAKE CALAVERA PROJECT SITE PROJECT NO. #37 PROJECT LOCATION: College Boulevard at Carlsbad Village Drive. PROJECT DESCRIPTION: Furnish and install standby generator and generator building at Calavera Hills Booster Pump Station. PROJECT NEED: The existing booster station at this location does not have backup power. If an electrical power outage occurs, the pump station will not operate. The addition of a permanent generator at this facility will increase reliability in accordance with Council goals. FINANCING: Purpose Design/Adm/lnsp Construction Total Cost = Estimated Cost Funding Source $105,000 $363,817 $468,817 Water Connection Water Connection Calhills Page 118 CAPITAL PROJECT DESCRIPTION WATER DISTRIBUTION SYSTEM - CANNON ROAD EAST OF EL CAMINO REAL PROJECT NAME 5000 PROJECT LOCATION MAP: PROJECT PROJECT NO. #9 PROJECT LOCATION: In Cannon Road from Merwin Drive east to intersection with College Boulevard. PROJECT DESCRIPTION: Construct 4,400 feet of 12-inch watermain. PROJECT NEED: Provides water supply for new development and creates 375 Zone loop east of El Camino Real. Funds will be used to reimburse developer required to construct 12-inch watermain. FINANCING: Purpose Construction Adm/Design/lnsp Total Cost = Estimated Cost Funding Source $585,800 $175,000 $760,800 Water Connection Water Connection Cannon2 Page 119 CAPITAL PROJECT DESCRIPTION NONE WATER DISTRIBUTION SYSTEM - CARLSBAD BOULEVARD SOUTH OF AVENIDA ENCINAS PROJECT NO PROJECT NAME PROJECT LOCATION MAP: #22 PROJECT LOCATION: Carlsbad Boulevard from Avenida Encinas south to District boundary. PROJECT DESCRIPTION: Construct 4,900 feet of 12-inch watermain. PROJECT NEED: Provides a two-way emergency connection with San Diego Water District 240 Zone. Can also supply water to 318 Zone west of I-5. FINANCING: Purpose Construction Adm/Design/lnsp Total Cost = Estimated Cost Funding Source $686,171 $200,000 $886,171 Water Replacement Water Replacement Cbadblv2 Page 120 CAPITAL PROJECT DESCRIPTION WATER DISTRIBUTION SYSTEM - CATHODIC PROTECTION PROGRAM PROJECT NAME 5007 PROJECT NO. PROJECT LOCATION MAP: VARIOUS LOCATIONS THROUGHOUT THE CARLSBAD MUNICIPAL WATER DISTRICT PROJECT LOCATION: Various locations throughout the Carlsbad Municipal Water District. PROJECT DESCRIPTION: Design and construct corrosion control improvements for existing domestic water pipelines, recycled water pipelines, and reservoir associate pipelines. PROJECT NEED: A Cathodic Protection Inspection and Testing Report completed in 2006 identified existing metallic pipelines with no cathodic protection and existing cathodic protection systems were not operating. Corrosion is a major cause of pipeline failure. Mitigating the corrosion process extends pipeline service life, reduces pipeline failures and saves future maintenance and replacement costs. FINANCING: Purpose Design Construction Total Cost = Estimated Cost Funding Source $143,850 $1,102,850 $1,246,700 Water Capital Replacement Water Capital Replacement CATHODIC Page 121 CAPITAL PROJECT DESCRIPTION NONE WATER DISTRIBUTION SYSTEM - COLLEGE BOULEVARD - CANNON ROAD TO BADGER LANE PROJECT NO. PROJECT NAME PROJECT LOCATION MAP: PROJECT /r #8 PROJECT LOCATION: College Boulevard from Cannon Road south to Badger Lane. PROJECT DESCRIPTION: Construct 4,130 feet of 12-inch watermain. PROJECT NEED: Provides water supply for new development and creates 375 Zone loop east of El Camino Real. FINANCING: Purpose Construction Adm/Design/lnsp Total Cost = Estimated Cost Funding Source $601,749 $145,200 $746,949 Water Connection Water Connection College Page 122 CAPITAL PROJECT DESCRIPTION WATER DISTRIBUTION SYSTEM - COLLEGE BOULEVARD (ECR TO CANNON ROAD) PROJECT NAME NONE PROJECT LOCATION MAP: LAKE CALAVERA PROJECT NO. #7 PROJECT LOCATION: College Boulevard from 400' north of El Camino Real northerly to future Cannon Road. PROJECT DESCRIPTION: Install 4,000 LF of 16-inch line. (In 490 H.G. Zone) PROJECT NEED: To meet the future demands of the area from LFMP Zones 14 and 15. Developer to pay 50% of cost. FINANCING: Purpose Estimated Cost Funding Source Design/Construction $487,436 Water Connection Fee Design/Construction $487,436 * Other - Developer Total Cost =$974,872 *Developer cost not shown in CIP schedules. Colleges Page 123 CAPITAL PROJECT DESCRIPTION WATER DISTRIBUTION SYSTEM - COLLEGE BOULEVARD MAERKLE RESERVOIR TO AGUA HEDIONDA CREEK PROJECT NAME 5001 PROJECT LOCATION MAP: ~l FARADAY PROJECT NO. #10&#11 PROJECT LOCATION: From Maerkle Reservoir west to the future extension of College Boulevard. PROJECT DESCRIPTION: Install 9,300 LF of 36-inch waterline. (In 490 H.G. Zone). PROJECT NEED: Increase supply from Maerkle Reservoir and provide redundant supply pipeline. Supply to new 490 Zone development east of El Camino Real. FINANCING: Purpose Design/Adm/lnsp Construction Total Cost = Estimated Cost $662,100 $3,096,420 $3,758,520 Funding Source Water Replacement Water Replacement Maerkle2 Page 124 CAPITAL PROJECT DESCRIPTION WATER DISTRIBUTION SYSTEM - CRESTVIEW DRIVE TRANSMISSION MAIN PROJECT NAME NONE PROJECT NO. PROJECT LOCATION MAP:PROJECT LOCATION: Crestview Drive west of El Camino Real. PROJECT DESCRIPTION: Construct 600 feet of 8-inch diameter pipeline. PROJECT NEED: To provide a redundant water supply to existing residential area. FINANCING: Purpose Estimated Cost Funding Source Design Construction Total Cost = $30,000 $120,519 $150,519 Water Replacement Water Replacement No_agua Page 125 CAPITAL PROJECT DESCRIPTION WATER DISTRIBUTION SYSTEM - DEMOLITION OF WATER FACILITIES AT PAJAMA DRIVE PROJECT NAME 3955 PROJECT NO. PROJECT LOCATION MAP: 3DDDDDD PROJECT LOCATION: Corner of Pajama Drive and Mesa Boulevard in the City of Oceanside. PROJECT DESCRIPTION: Remove an existing abandoned surge tank and a control building. PROJECT NEED: Facilities were abandoned in 1971 when Carlsbad began using imported water and quit pumping from the San Luis Rey River Valley. FINANCING: Purpose Design Construction Admin/Inspection Total Cost = Estimated Cost Funding Source $11,500 $65,000 $19,000 $95,500 Water Replacement Water Replacement Water Replacement Pajamadr Page 126 CAPITAL PROJECT DESCRIPTION WATER DISTRIBUTION SYSTEM - DESALINATION GROUNDWATER/SEAWATER STUDY PROJECT NAME NONE PROJECT NO. PROJECT LOCATION MAP: N/A PROJECT LOCATION: Not Applicable. PROJECT DESCRIPTION: Preparation of a report investigating various methods of treating City owned groundwater located in the San Luis aquifer in Oceanside and identifying conveyance methods to transport the treated water to Carlsbad. Also included is a study of the feasibility of constructing a seawater desalination plant and identifying potential sites upon which to construct a desalination plant. PROJECT NEED: To develop supplemental source of water. FINANCING: Purpose Planning Study Total Cost = Estimated Cost $719,260 $719,260 Funding Source Water Replacement DESALINA Page 127 CAPITAL PROJECT DESCRIPTION WATER DISTRIBUTION SYSTEM - EL CAMINO REAL (PALOMAR AIRPORT ROAD SOUTH) PROJECT NAME 3446 PROJECT LOCATION MAP: PALOMAR AIRPORT PROJECT NO. #16 PROJECT LOCATION: El Camino Real - Palomar Airport Road South 6,100 LF. PROJECT DESCRIPTION: Replace 20" steel water line in El Camino Real South 6,100 LF with a new 24-inch water line. PROJECT NEED: Replacing old steel water line to avoid high maintenance costs and extend pipeline to new Poinsettia Lane road alignment. FINANCING: Purpose Design Construction Admin/Inspection Total Cost = Estimated Cost $305,000 $2,620,000 $300,000 $3,225,000 Funding Source Water Replacement Water Replacement Water Replacement ECRPARSO Page 128 CAPITAL PROJECT DESCRIPTION WATER DISTRIBUTION SYSTEM - EL CAMINO REAL BETWEEN COLLEGE & JACKSPAR PROJECT NAME 5003 PROJECT LOCATION MAP: PROJECT NO. #4 PROJECT LOCATION: Jackspar Drive from Longfellow to El Camino Real, south on El Camino Real to College Boulevard, and northeast on College Boulevard to Badger Lane. PROJECT DESCRIPTION: Construct 4,000 feet of 12-inch watermain. PROJECT NEED: Connects isolated portions of 375 Zone and provides for supply from Maerkle Reservoir for existing and future development. FINANCING: Purpose Design Construction Adm/lnsp Total Cost = Estimated Cost Funding Source $76,000 $856,350 $38,925 $971,275 Water Connection Water Connection Water Connection ColLECR Page 129 CAPITAL PROJECT DESCRIPTION WATER DISTRIBUTION SYSTEM - EL CAMINO REAL CROSSING AT KELLY DRIVE PROJECT NAME 5002 PROJECT LOCATION MAP: PROJECT NO. #31 PROJECT LOCATION: El Camino Real at Kelly Drive. PROJECT DESCRIPTION: Install 300 LF of 12" line. (In 490 H.G. Zone) PROJECT NEED: To meet the future demands of the area. Increase supply to 255 Zone directly from 490 Zone through Kelly Pressure Reducing Station. FINANCING: Purpose Design Construction Admin/Inspection Total Cost = Estimated Cost $75,000 $619,570 $30,430 $725,000 Funding Source Water Connection Water Connection Water Connection ECRCROSS Page 130 CAPITAL PROJECT DESCRIPTION WATER DISTRIBUTION SYSTEM - EL CAMINO REAL TRANSMISSION MAIN FROM FARADAY AVENUE TO COUGAR DRIVE PROJECT NAME 3843 PROJECT NO. PROJECT LOCATION MAP: PROJECT SITE PROJECT LOCATION: El Camino Real from Faraday Avenue north to Cougar Drive and pressure reducing station north side of Faraday Avenue. PROJECT DESCRIPTION: Construction of 1,500 feet of 30-inch diameter transmission main and pressure reducing station. PROJECT NEED: Larger diameter pipe reduces pressure loss during emergency supply to 550 Zone from Maerkle Reservoir. FINANCING: Purpose Design Construction Total Cost = Estimated Cost $50,000 $724,100 $774,100 Funding Source Water Replacement Water Replacement Page 131 ECRTRANS CAPITAL PROJECT DESCRIPTION WATER DISTRIBUTION SYSTEM - EL CAMINO REAL/CARLSBAD VILLAGE DRIVE WATER PIPELINE REPLACEMENT PROJECT NAME 3911 PROJECT NO. PROJECT LOCATION MAP: PROJECT SITE PROJECT LOCATION: El Camino Real at Carlsbad Village Drive. PROJECT DESCRIPTION: Replace 200 feet of existing 10-inch diameter water pipeline crossing El Camino Real at Carlsbad Village Drive. The pipeline shall be replaced between existing pressure reducing stations. Existing pipeline cannot be repaired. PROJECT NEED: Existing pipeline has corroded and cannot be repaired because of depth and interference with existing storm drain. This pipeline supplies water to an existing pressure reducing station supplying water to the 330 pressure zone. Replacing this pipeline will ensure water redundancy and reliability in the services area. FINANCING: Purpose Design Construction Admin/Inspection Total Cost = Estimated Cost $16,000 $242,935 $11,040 $269,975 Funding Source Water Replacement Water Replacement Water Replacement ECR CVD Page 132 CAPITAL PROJECT DESCRIPTION WATER DISTRIBUTION SYSTEM - EL FUERTE (NORTH OF LOKER) PROJECT NAME 3912 PROJECT LOCATION MAP: PROJECT SITE m\\ y\\~r\ PROJECT NO. #13 PROJECT LOCATION: El Fuerte Avenue between Loker north to future Faraday Avenue. PROJECT DESCRIPTION: Install 2,200 LF of 16-inch line. (In 700-550 H.G. Zone). PROJECT NEED: To meet the future demands of the area. Developer to pay 75% of the cost. Provides looped supply to new North 700 Zone. FINANCING: Purpose Design/Construction Design/Construction Total Cost = Estimated Cost Funding Source $148,750 $246,900 * $395,650 Water Connection Fee Other - Developer *Developer cost not shown in CIP schedules. ELFUERT5 Page 133 CAPITAL PROJECT DESCRIPTION WATER DISTRIBUTION SYSTEM - EL FUERTE (ALGA ROAD TO POINSETTIA LANE) PROJECT NAME 3816 PROJECT NO. PROJECT LOCATION MAP:PROJECT LOCATION: Future El Fuerte from Alga Road to Poinsettia Lane. PROJECT DESCRIPTION: Install 5,050 LF of 30-inch line and a pressure regulating station. (In 700 H.G. Zone). PROJECT NEED: To meet the future demands of the area. FINANCING: Estimated Cost Funding Source $2,000,000 Water Connection Fee $2,000,000 Purpose Design/Construction Total Cost = ELFUERTE Page 134 CAPITAL PROJECT DESCRIPTION 3913 WATER DISTRIBUTION SYSTEM - EL FUERTE (POINSETTIA LANE TO PALOMAR AIRPORT ROAD) PROJECT NO. PROJECT NAME PROJECT LOCATION MAP: #15 PROJECT LOCATION: Future El Fuerte south of Palomar Airport Road. PROJECT DESCRIPTION: Install 5,200 LF of 24-inch line. PROJECT NEED: To meet the future demands of the area. Connects 700 North and 700 South pressure zones. Funds will be used to reimburse developer required to construct 24-inch waterline. FINANCING: Purpose Design/Adm/lnsp Construction Total Cost = Estimated Cost Funding Source $291,000 $850,000 $1,141,000 Water Connection Fee Water Connection Fee ELFUERT4 Page 135 CAPITAL PROJECT DESCRIPTION WATER DISTRIBUTION SYSTEM - EL FUERTE AND CORINTIA STREET PROJECT NAME PROJECT LOCATION MAP: PROJECT SITE PROJECT NO. #21 PROJECT LOCATION: Intersection of El Fuerte and Corintia Street. PROJECT DESCRIPTION: Construct Pressure Reducing Station. PROJECT NEED: Provide redundant water supply to 680,580 South and 510 Zones. FINANCING: Estimated Cost Funding SourcePurpose Construction Adm/Design/lnsp Total Cost = $121,272 $35,000 $156,272 Water Replacement Water Replacement EIFuertS Page 136 CAPITAL PROJECT DESCRIPTION WATER DISTRIBUTION SYSTEM - ELLERY WATER PUMP PROJECT PROJECT NAME 3900 PROJECT NO. PROJECT LOCATION MAP: VILLAGE PROJECT LOCATION: Ellery Pump Station - Janis Way. PROJECT DESCRIPTION: The Water District's Ellery Pump Station is designed to maintain adequate flow during fire demands and boost pressure in the event of a significant drop in pressure or increase in demand. The pump station operates from a motor control center that has a service life in excess of twenty years. The scope of this project is the replacement of the pump station's motor control center. PROJECT NEED: The motor control center for the Ellery Pump Station has over twenty years of service life. Its design is outdated, major components are obsolete and, as a result, repairs may not be possible. Replacement of the motor control center will ensure reliability, efficiency, availability of parts and the ability to pull maintenance in a safe and timely manner. FINANCING: Purpose Design Construction Admin/Inspection Total Cost = Estimated Cost $30,000 $155,900 $20,000 $205,900 Funding Source Water Replacement Water Replacement Water Replacement Waterpmp Page 137 CAPITAL PROJECT DESCRIPTION WATER DISTRIBUTION SYSTEM - FARADAY AVENUE EXTENSION PROJECT NAME NONE PROJECT LOCATION MAP: 'ROJECT PROJECT NO. #14 PROJECT LOCATION: In future Faraday Avenue extension between El Fuerte and Melrose Avenue. PROJECT DESCRIPTION: Construct 3,600 feet of 16-inch watermain. PROJECT NEED: Provides looped study to LFMZ Zone 16 and supply to 550 Zone from 700 to 550 PRV. Funds will be used to reimburse developer for construction of 16-inch watermain. FINANCING: Purpose Construction Adm/Design/lnsp Total Cost = Estimated Cost Funding Source $582,773 $167,000 $749,773 Water Connection Water Connection Faraday Page 138 CAPITAL PROJECT DESCRIPTION WATER DISTRIBUTION SYSTEM - FOUSSAT ROAD WELL ABANDONMENT PROJECT NAME 3903 PROJECT LOCATION MAP: PROJECT NO. #32 PROJECT LOCATION: Southeast corner of Foussat Road and Mission Avenue in Oceanside. PROJECT DESCRIPTION: Abandon well per State standards, remove pumps, valves, concrete structures and general restoration of property. PROJECT NEED: The existing well and equipment are not usable and must be properly removed. FINANCING: Estimated Cost Funding SourcePurpose Design Construction Total Cost = $40,000 $162,500 $202,500 Water Replacement Fund Water Replacement Fund Foussat Page 139 CAPITAL PROJECT DESCRIPTION WATER DISTRIBUTION SYSTEM - LAKE CALAVERA RESERVOIR IMPROVEMENTS PROJECT NAME 3821 PROJECT NO. PROJECT LOCATION MAP: PROJECT SITE C_ITY_p_F OCEfflSIDE ' CITY OF CARLSBAD "' J LAKE CALAVERA PROJECT LOCATION: Lake Calavera in the northeast quadrant of the City. PROJECT DESCRIPTION: Replace outlet tower valves and piping to restore function. Repair existing spillway and channel to improve flow, safety, and access. Upgrade existing access road and improve security with fencing and gates. PROJECT NEED: The existing valves located within the outlet tower have failed and water is presently draining from the reservoir and cannot be stopped. Left unrepaired, the lake will completely dry up and does not comply with dam safety requirements. The walkway structure to the outlet tower was removed due to safety issues, but direct access to the outlet structure needs to be restored for maintenance purposes. Repair of the outlet structure will also allow Calavera Dam to function as a flood control retention facility to help alleviate potential downstream flooding in the area of the Rancho Carlsbad Mobile Home Park. FINANCING: Purpose Estimated Cost Funding Source Design/Studies $816,000 Construction $4,654,235 Environmental $335,000 Admin/Inspection $292,000 Monitoring & Maintenance $549,673 Total Cost = $6,646,908 Water Replacement Water Replacement Water Replacement Water Replacement Water Replacement Lake cal Page 140 CAPITAL PROJECT DESCRIPTION WATER DISTRIBUTION SYSTEM - MAERKLE DAM FLOATING COVER PROJECT NAME NONE PROJECT LOCATION MAP: PROJECT NO. #14 PROJECT LOCATION: Maerkle Dam. PROJECT DESCRIPTION: The project covers the design and construction of a rainwater removal system. PROJECT NEED: The existing cover was installed in 1998 and has reached its life expectancy. The current system is experiencing hose leaks and pump failures. Since the reservoir contains treated drinking water, failure of the rainwater system could expose the CMWD to possible fines. FINANCING: Purpose Estimated Cost Funding Source Design/Construction $200,000 Water Replacement Total Cost = $200,000 MAERK_CVR Page 141 CAPITAL PROJECT DESCRIPTION WATER DISTRIBUTION SYSTEM - MAERKLE PUMP STATION PROJECT NAME 5004 PROJECT LOCATION MAP: PROJECT NO. #29(a) & (b) PROJECT LOCATION: Maerkle Reservoir. PROJECT DESCRIPTION: Enlarge pump station. PROJECT NEED: Required for emergency supply from Maerkle Reservoir. FINANCING: Purpose Estimated Cost Funding Source Construction Construction Total Cost = $747,100 $747,100 $1,494,200 Water Connection Water Replacement MaerkleS Page 142 CAPITAL PROJECT DESCRIPTION WATER DISTRIBUTION SYSTEM - MAERKLE RESERVOIR BRIDGE REPLACEMENT PROJECT NAME 5006 PROJECT LOCATION MAP: PROJECT NO. #19 PROJECT LOCATION: Access bridge at Maerkle Reservoir. PROJECT DESCRIPTION: Remove existing damaged access bridge and replace with a prefabricated steel truss bridge. It is assumed the existing abutments will be reused. PROJECT NEED: Replacement of existing damaged bridge is necessary to maintain site access. FINANCING: Estimated Cost Funding SourcePurpose Design $23,000 Environmental Review $5,750 Construction $172,500 Total Cost = $201,250 Water Capital Replacement Water Capital Replacement Water Capital Replacement MAERK RES Page 143 CAPITAL PROJECT DESCRIPTION WATER DISTRIBUTION SYSTEM - MAERKLE RESERVOIR STORAGE (TAP #2) PROJECT NAME NONE PROJECT LOCATION MAP: i PROJECT NO. #28 PROJECT LOCATION: Adjacent to Maerkle Reservoir. PROJECT DESCRIPTION: Construct buried 15 MG water storage reservoir next to existing Maerkle Reservoir. PROJECT NEED: Provides additional emergency storage to meet 10-day storage criteria based on ultimate demands. FINANCING: Purpose Construction Adm/Design/lnsp Total Cost = Estimated Cost Funding Source $12,287,757 $1,475,000 $13,762,757 Water Connection Water Connection Maerkle Page 144 CAPITAL PROJECT DESCRIPTION NONE WATER DISTRIBUTION SYSTEM - MARRON ROAD (PRESSURE REGULATING STATION TO OCEANSIDE) PROJECT NAME PROJECT NO. PROJECT LOCATION MAP: PROJECT PROJECT LOCATION: Marron Road from Avenida de Anita easterly 6,600 feet. PROJECT DESCRIPTION: Install 6,600 LF of 12-inch line and two pressure regulating stations. Developer to pay 50% of cost. PROJECT NEED: To meet future demands in accordance with Growth Management Standards. Provide additional supply to 255 Zone. FINANCING: Purpose Estimated Cost Design/Construction $741,221 Design/Construction $741,221 Funding Source Water Connection Other - Developer Total Cost =$1,482,442 *Developer cost not included in CIP schedules. MARRONRD Page 145 CAPITAL PROJECT DESCRIPTION WATER DISTRIBUTION SYSTEM - MASTER PLAN UPDATE PROJECT NAME NONE PROJECT NO. PROJECT LOCATION MAP: LOCATIONS THROUGHOUT THE CITY PROJECT LOCATION: Throughout the City. PROJECT DESCRIPTION: Update the CMWD's 2003 Water Master Plan based on anticipated growth projections and obtain necessary CEQA approval through an amendment to the EIR for adoption by City Council. PROJECT NEED: The Master Plan update will help identify the need for changes to planned facilities based on the timing of growth projections and Growth Management Standards. FINANCING: Study Total Cost = Estimated Cost $47,800 $47,800 Funding Source Water Connection Fee Mstrplan Page 146 CAPITAL PROJECT DESCRIPTION WATER DISTRIBUTION SYSTEM - MELROSE DRIVE PALOMAR AIRPORT ROAD TO FARADAY PROJECT NAME NONE PROJECT LOCATION MAP: 'ROJECT PROJECT NO. #12 PROJECT LOCATION: Melrose Drive between Palomar Airport Road and Faraday Avenue. PROJECT DESCRIPTION: Construct 4,000 feet of 16-inch watermain. PROJECT NEED: Provide looped supply to new North 700 Zone in LFMZ Zone 16 business park. Funds will be used to reimburse developer required to construct 16-inch watermain. FINANCING: Purpose Construction Adm/Design/lnsp Total Cost = Estimated Cost Funding Source $609,800 $186,500 $796,300 Water Connection Water Connection Melrose Page 147 CAPITAL PROJECT DESCRIPTION WATER DISTRIBUTION SYSTEM - MISCELLANEOUS PIPELINE REPLACEMENTS PROJECT NAME 3904 PROJECT NO. PROJECT LOCATION MAP: CITYWIDE PROJECT LOCATION: Various locations. PROJECT DESCRIPTION: Replace existing small diameter and older pipelines at 14 locations. PROJECT NEED: Provide increased water supply to meet fire flow requirements. FINANCING: Estimated CostPurpose Design Construction Admin/Inspection Total Cost = $150,000 $1,647,151 $49,900 $1,847,051 Funding Source Water Replacement Water Replacement Water Replacement WTR PIPE Page 148 CAPITAL PROJECT DESCRIPTION WATER DISTRIBUTION SYSTEM - MISCELLANEOUS WATER RESERVOIR FENCING PROJECT NAME 3822 PROJECT NO. PROJECT LOCATION MAP: LA COSTA LO PROJECT LOCATION: At various water reservoir locations throughout the City as shown on the map including the TAP, "C", "E", Santa Fe II and La Costa Lo. PROJECT DESCRIPTION: Install protective fencing around the identified reservoir sites for safety and security purposes. PROJECT NEED: Project is required to protect the existing reservoir sites from vandalism and to ensure safety of the public. Ongoing development in the City has made these once isolated reservoir sites more accessible to the public thus intensifying the need for protective fencing. FINANCING: Purpose Construction Total Cost = Estimated Cost Funding Source $197,399 Water Replacement Fund $197,399 Reservoirs Page 149 CAPITAL PROJECT DESCRIPTION WATER DISTRIBUTION SYSTEM - OCEANSIDE INTERTIE UPGRADE PROJECT NAME 3531 PROJECT NO. PROJECT LOCATION MAP: PROJECT SITE CITYOFQCEfflSIDE. CITY OF CMLSBM PROJECT LOCATION: El Camino Real near State Highway 78. PROJECT DESCRIPTION: Make improvements to increase reliability of water system intertie with City of Oceanside. System supplies 5 cfs of treated water to Carlsbad. During emergencies and periods of water supply curtailment, the Oceanside intertie provides backup. PROJECT NEED: The system requires valve, pipe, and meter replacement. FINANCING: Estimated Cost Funding Source $110,700 Water Replacement $110,700 Purpose Design/Construction Total Cost = OSIDEINT Page 150 CAPITAL PROJECT DESCRIPTION 3910 WATER DISTRIBUTION SYSTEM - PALOMAR AIRPORT ROAD/EL CAMINO REAL PUMP STATION PROJECT NAME PROJECT LOCATION MAP: PALOMAR AIRPORT PROJECT NO. #20 PROJECT LOCATION: Intersection of Palomar Airport Road and El Camino Real. PROJECT DESCRIPTION: Grade site and construct a pump station to supply water from 490 pressure zone to 700 pressure zone. PROJECT NEED: To supply water from Maerkle Reservoir (490 pressure zone) to 700 pressure zone during emergencies and during routine maintenance of the imported water aqueducts. FINANCING: Purpose Construction Construction Total Cost = Estimated Cost $990,350 $997,350 $1,987,700 Funding Source Water Replacement Fee Water Connection Fee 700 ZONE Page 151 CAPITAL PROJECT DESCRIPTION WATER DISTRIBUTION SYSTEM - POINSETTIA LANE (EL CAMINO REAL TO SKIMMER COURT) PROJECT NAME NONE PROJECT NO. PROJECT LOCATION MAP:PROJECT LOCATION: Poinsettia Lane from El Camino Real to Skimmer Court. PROJECT DESCRIPTION: Install 1,300 LF of 12-inch line. (In 375 H.G. Zone). PROJECT NEED: Parallel existing 8-inches to increase capacity in the 375 Zone and supply from 550 Zone. Funds will be used to reimburse the developer required to construct the 12-inch waterline. FINANCING: Purpose Construction Total Cost = Estimated Cost $121,478 $121,478 Funding Source Water Connection Fee POINSET2 Page 152 CAPITAL PROJECT DESCRIPTION NONE WATER DISTRIBUTION SYSTEM - POINSETTIA LANE (SKIMMER COURT TO CASSIA ROAD) PROJECT NO. PROJECT NAME PROJECT LOCATION MAP: #17 PROJECT LOCATION: In Poinsettia Lane between Skimmer Court and Cassia Road. PROJECT DESCRIPTION: Construct 4,500 feet of 12-inch watermain. PROJECT NEED: Completes 375 Loop on Poinsettia Lane. Increase capacity to/from D3 Reservoir. FINANCING: Purpose Construction Construction Total Cost = Estimated Cost Funding Source $370,610 $472,583 $843,193 Water Connection Water Replacement Poinskim Page 153 CAPITAL PROJECT DESCRIPTION NONE WATER DISTRIBUTION SYSTEM - POINSETTIA LANE EAST OF BLACK RAIL ROAD PROJECT NO. PROJECT NAME PROJECT LOCATION MAP: #18 PROJECT LOCATION: Poinsettia Lane - 1,100 feet east of Black Rail Road. PROJECT DESCRIPTION: Construct 1,100 feet of 30-inch watermain. PROJECT NEED: Increase supply to 550 Zone and D3 Reservoir. FINANCING: Estimated CostPurpose Construction Construction Total Cost = $222,691 $222,583 $445,274 Funding Source Water Connection Water Replacement Poinblack Page 154 CAPITAL PROJECT DESCRIPTION NONE WATER DISTRIBUTION SYSTEM - PRESSURE REDUCING STATION - SYCAMORE CREEK PROJECT NO. PROJECT NAME PROJECT LOCATION MAP: PROJECT #30 PROJECT LOCATION: Within Sycamore Creek area of LFMZ Zone 15. PROJECT DESCRIPTION: Upgrade existing Pressure Reducing Station for 490 to 375 Zone. PROJECT NEED: Increase capacity of existing Pressure Reducing Station to supply new development from 490 Zone. FINANCING: Purpose Construction Adm/Design/lnsp Total Cost = Estimated Cost Funding Source $96,478 $25,000 $121,478 Water Connection Water Connection PRSJmpr Page 155 CAPITAL PROJECT DESCRIPTION 3858 WATER DISTRIBUTION SYSTEM - RANCHO CARRILLO OVERSIZING/EXTENSION PROJECT NO. PROJECT NAME PROJECT LOCATION MAP: 2-8" WATER PIPELINE EXTENSIONS 10 OVERSIZE WATER PIPELINE PROJECT LOCATION: The waterline extends from Melrose Drive west along Via Patron and Terraza Portico to an existing waterline in Carrillo Way. Also include are two short extension within Paseo Aspada and Rancho Miel. PROJECT DESCRIPTION: Construction of new 8" and 10" water mains. A 10" waterline will be extended from an existing waterline in Melrose Drive to an existing waterline in Carrillo Way through the Village 'N' development of Rancho Carrillo to provide a looped water connection. The project also includes the extension of two 8" lines within Paseo Aspada and Rancho Miel to complete the looped system. PROJECT NEED: To meet the future demands of the area and to provide for a looped water line for greater reliability to the existing residents within Village 'N' of the Rancho Carrillo development. FINANCING: Purpose Design/Construction Total Cost = Estimated Cost $93,700 $93,700 Funding Source Water Connection Fee RC_Over Page 156 CAPITAL PROJECT DESCRIPTION WATER DISTRIBUTION SYSTEM - SAN MARCOS BOULEVARD PIPELINE REPLACEMENT PALOMAR AIRPORT ROAD WEST OF SAN DIEGO COUNTY WATER AUTHORITY (SDCWA) PROJECT NAME 3956 PROJECT NO. #26 PROJECT LOCATION MAP:PROJECT LOCATION: Palomar Airport Road west of the San Diego County Water Authority (SDCWA) Connection #1. PROJECT DESCRIPTION: Replace approximately 4,100 feet of existing 27-inch and 21-inch diameter steel waterline with new 30-inch steel watermain. PROJECT NEED: Reduce velocity and provide increased capacity from SDCWA #1 Connection to 700 Zone. In addition, both the 21-inch and 27-inch pipes are over 40 years old and at the end of their service life. FINANCING: Purpose Design Construction Adm/lnsp Total Cost = Estimated Cost Funding Source $101,000 $2,870,241 $120,000 $3,091,241 Water Replacement Water Replacement Water Replacement PARwater Page 157 CAPITAL PROJECT DESCRIPTION 3915 WATER DISTRIBUTION SYSTEM - TANGLEWOOD PRESSURE REDUCING STATION REPLACEMENT PROJECT NAME PROJECT NO. PROJECT LOCATION MAP:PROJECT LOCATION: Intersection of Carlsbad Village Drive and El Camino Real. PROJECT DESCRIPTION: Replace vault, piping and valves of existing pressure reducing station. PROJECT NEED: The existing pressure reducing station is to be replaced due to deteriorated condition of vault, valve and piping. FINANCING: Purpose Design Construction Admin/Inspection Total Cost = Estimated Cost Funding Source $50,000 $291,500 $13,250 $354,750 Water Replacement Fund Water Replacement Fund Water Replacement Fund Tangle Page 158 CAPITAL PROJECT DESCRIPTION WATER DISTRIBUTION SYSTEM - WATER SYSTEM INTERTIE CONNECTION PROJECT NAME 3664 PROJECT NO. PROJECT LOCATION MAP: SITE SITE PROJECT LOCATION: VID - Business Park Drive Vallecitos Water District Olivenhain Water District San Dieguito Water District PROJECT DESCRIPTION: Construct pipeline system intertie with adjacent water agencies including Vista Irrigation District, Vallecitos Water District, Olivenhain Water District, and San Dieguito Water District. PROJECT NEED: During emergencies, these interties could supply water to the City and also provide water back to the adjacent agencies. FINANCING: Purpose Design/Construction Total Cost = Estimated Cost $439,000 $439,000 Funding Source Water Replacement WTRINTER Page 159 RECYCLED WATER PROJECTS FUNDING MATRIX FOR RECYCLED WATER PROJECTS PROJ NO. 5200 3487 3675 3881 3890 3887 3889 FUND NO. 52001 34871 36753 38881 38901 38871 38891 PROJECT TITLE CHESTNUT AVENUE RECYCLED WATER LINE ECR/TAMARACK PUMP STATION REMOVAL I-5 RECYCLED WATER TRANSMISSION LINE PUMP STATION REMOVAL RECYCLED WATER PH II - FACILITY RECYCLED WATER PH II - FLOW EQUALIZATION RECYCLED WATER PH II - MAHR RESERVOIR IMPROV. RECYCLED WATER PH II - PIPELINES RECYCLED WATER PH II - PUMP STATIONS FUNDING SOURCE WATER REPL WATER REPL WATER REPL WATER REPL RECL WATER RECL WATER RECL WATER RECL WATER RECL WATER TOTAL BUDGET 436,100 80,019 266,610 442,700 12,130,019 4,127,402 2,957,000 21,852,521 4,918,574 FUTURE YEAR BUDGET AMOUNTS YEAR1 2007-08 YEAR 2 2008-2009 436,100 YEAR 3 2009-2010 80,019 YEAR 4 2010-2011 133,305 YEARS 2011-2012 YEAR 6-10 2012-2017 BUILDOUT 2017-2022 Page 160 CAPITAL PROJECT DESCRIPTION RECYCLED WATER PROJECTS - CHESTNUT AVENUE RECYCLED WATER LINE PROJECT NAME NONE PROJECT NO. PROJECT LOCATION MAP:PROJECT LOCATION: Chestnut Avenue from 1-5 to SDNR right-of-way. PROJECT DESCRIPTION: Construct an 8-inch PVC recycled waterline in Chestnut Avenue from the existing line in 1-5 to the railroad right-of-way. PROJECT NEED: The new 8-inch line will provide the distribution of recycled water to the future Pine School Park and the Coastal Rail Trail. FINANCING: Purpose Administration Design Construction Total Cost = Estimated Cost Funding Source $17,000 $25,000 $394,100 $436,100 Water Replacement Water Replacement Water Replacement Chestnut Page 161 CAPITAL PROJECT DESCRIPTION RECYCLED WATER PROJECTS - EL CAMINO REAL AND TAMARACK RW PUMP STATION PROJECT NAME NONE PROJECT NO. PROJECT LOCATION MAP: CALAVERAWASTEWATERTREATMENTPLANT PROJECT LOCATION: Southeast corner of El Camino Real and Tamarack Avenue. PROJECT DESCRIPTION: Remove existing pump station and rehabilitate the site. PROJECT NEED: Existing pump station was constructed for the Calavera Wastewater Treatment Plant, which is no longer necessary. Removes attractive nuisance and reduces maintenance needs. FINANCING: Purpose Design Construction Admin/Inspection Total Cost = Estimated Cost $10,000 $53,519 $16,500 $80,019 Funding Source Water Replacement Water Replacement Water Replacement ECFLPUMP Page 162 CAPITAL PROJECT DESCRIPTION RECYCLED WATER PROJECTS -1-5 RECYCLED WATER TRANSMISSION LINE PROJECT NAME 5200 PROJECT NO. PROJECT LOCATION MAP: PROJECT PROJECT LOCATION: 1-5 Freeway from Palomar Airport Road to Carlsbad Village Drive. PROJECT DESCRIPTION: Caltrans installed a transmission main from Poinsettia Lane north to Jefferson Street in 1996. The pipeline was oversized to supply recycled water to areas north of Tamarack Avenue. PROJECT NEED: To supply recycled water to Carlsbad north of Tamarack Avenue. FINANCING: Estimated Cost Funding Source $266,610 Water Replacement $266,610 Purpose Design/Construction Total Cost = I5TRNSLN Page 163 CAPITAL PROJECT DESCRIPTION RECYCLED WATER - PUMP STATION REMOVAL PROJECT NAME 3487 PROJECT NO. PROJECT LOCATION MAP: PALOMAR AIRPORT PROJECT PROJECT LOCATION: El Camino Real south of Palomar Airport Road. PROJECT DESCRIPTION: Remove existing pump station and rehabilitate site. PROJECT NEED: Upon completion of Encina Basin Phase II and Carlsbad Boulevard Reclamation Facility Projects, existing pump station is no longer necessary. FINANCING: Purpose Estimated Cost Funding Source Design/Construction $442,700 Water Replacement Total Cost = $442,700 RCSTNUPG Page 164 CAPITAL PROJECT DESCRIPTION RECYCLED WATER PHASE II - FACILITY PROJECT NAME 3675 PROJECT NO. PROJECT LOCATION MAP: PROJECT SITE PROJECT LOCATION: South of Encina Water Pollution Control Facility (EWPCF). PROJECT DESCRIPTION: Design and construction of the Phase II Recycled Water Treatment Facilities near EWPCF on Avenida Encinas (4.0 mgd). This project is one of a series of projects included in the Phase II Recycled Water Program as identified in the City's Recycled Water Master Plan. PROJECT NEED: To provide additional recycled water to meet Phase II demand requirements of 4,480 acre-feet per year. FINANCING: Purpose Construction Total Cost = Estimated Cost Funding Source $12,130,019 Recycled Water $12,130,019 Trt_plnt Page 165 CAPITAL PROJECT DESCRIPTION RECYCLED WATER - RECYCLED WATER PHASE II - FLOW EQUALIZATION PROJECT NAME 3888 PROJECT NO. PROJECT LOCATION MAP: PROJECT SITE PROJECT LOCATION: Adjacent to the Carlsbad Water Reclamation Facility. PROJECT DESCRIPTION: Construction of a water storage facility adjacent to the Encina WPCF for the dual purpose of providing a clearwell for plant operations and a forebay, which would allow the pumps to operate at a constant discharge rate or adjust pumping rates based on peak irrigation periods. PROJECT NEED: Reduce the use of potable water by providing reclaimed water for irrigation purposes. FINANCING: Purpose Total Cost = Estimated Cost Funding Source $4,127,402 Recycled Water Flowequa Page 166 CAPITAL PROJECT DESCRIPTION RECYCLED WATER PROJECTS - PHASE II - MAHR RESERVOIR IMPROVEMENTS PROJECT NAME 3890 PROJECT NO. PROJECT LOCATION MAP: BUY 78 PROJECT LOCATION: At Mahr Reservoir. PROJECT DESCRIPTION: Mahr Reservoir is an existing earthen fill dam constructed in 1982 to store recycled water from the Meadowlark Reclamation Facility. It is located east of Rancho Santa Fe Road just south of Melrose Drive. Both the Meadowlark Reclamation Facility and Mahr Reservoir are owned and operated by Vallecitos Water District (VWD). PROJECT NEED: To meet water quality and operation needs for CMWD's recycled water system requires certain improvements be made to Mahr Reservoir. These improvements include: • Dredging and cleaning the reservoir bottom • Modifying the inlet/outlet works • Adding an aeration/destratification system • Performing miscellaneous site work FINANCING: Purpose Total Cost = Estimated Cost $2,957,000 Funding Source Recycled Water Mahr II Page 167 CAPITAL PROJECT DESCRIPTION RECYCLED WATER - RECYCLED WATER PHASE II - PIPELINES PROJECT NAME 3887 PROJECT NO. PROJECT LOCATION MAP: PROJECT PROJECT LOCATION: Palomar Airport industrial corridor and portion of northeast quadrant. PROJECT DESCRIPTION: Construction of approximately 120,126 feet of distribution pipelines ranging in size from 4 inches to 24 inches in diameter, 3 pressure reducing stations and connecting the Carlsbad Water Reclamation Facility with the Mahr Reservoir. PROJECT NEED: Reduce the use of potable water by providing reclaimed water for irrigation purposes. FINANCING: Purpose Total Cost = Estimated Cost Funding Source $21,852,521 Recycled Water Pipeline Page 168 CAPITAL PROJECT DESCRIPTION RECYCLED WATER - RECYCLED WATER PHASE II - PUMP STATIONS PROJECT NAME 3889 PROJECT NO. PROJECT LOCATION MAP: CALAVERA POMP STATION •D1 TANK PUMP STATION PROJECT LOCATION: "D" Tanks, Palomar Airport Road and El Camino Real, and College Boulevard north of Cannon Road. PROJECT DESCRIPTION: Construction of pump stations to transport reclaimed water to the following service areas: • "D" Tank Pump Station (384/550 Zone) • Calavera Pump Station (550 Zone) • PAR/ECR Pump Station (660 Zone) PROJECT NEED: To reduce the use of potable water by providing reclaimed water for irrigation purposes. FINANCING: Purpose Total Cost = Estimated Cost Funding Source $4,918,574 Recycled Water Pumpstat Page 169 CIRCULATION SYSTEM PROJECTS TRAFFIC SIGNAL PROJECTS FUNDING MATRIX FOR TRAFFIC SIGNAL PROJECTS PROJ NO. 3369 3369 6300 3902 6301 3917 3899 6302 6303 6304 3621 3938 3644 3939 3946 3406 3940 6305 FUND NO. 33692 33693 63001 39021 63011 39171 38991 63021 63031 63041 36211 39381 36441 39391 39461 34061 39401 63051 PROJECT TITLE TRAP SIG - ALGA ROAD AND CAZADERO TRAP SIG - AVIARA PARKWAY-POINSETTIA LANE TO EL CAMINO REAL TRAP SIG - AVIARA PARKWAY-POINSETTIA LANE TO EL CAMINO REAL TRAP SIG - AVIARA PKWY AND CAMINO DE LAS ONDAS- REIMB TRAP SIG - CALLE BARCELONA AND PASEO AVELLANO TRAP SIG - CAMINO DE LOS COCHES AND LA COSTA AVENUE TRAP SIG - CAMINO VIDA ROBLE AND YARROW DRIVE TRAP SIG - CANNON ROAD AND AVENIDA ENCINAS-reim. TRAP SIG - CANNON ROAD AND COLLEGE BOULEVARD TRAP SIG - CARLSBAD BLVD & TAMARACK SIGNAL REPAIRS TRAP SIG - CARLSBAD VILLAGE DRIVE AND GLASGOW DR TRAP SIG - COLLEGE BOULEVARD AND CARLSBAD VILLAGE DR - REIMB TRAP SIG - EL CAM. REAL/PLAZA/MARRON/HOSP WY TRAP SIG - EL CAMINO REAL AND CHESTNUT SIGNAL REPAIRS TRAP SIG - EL CAMINO REAL AND TAMARACK SIGNAL REPAIRS TRAP SIG - EL FUERTE ST AND RANCHO PANCHO TRAP SIG - FARADAY AVE. AND CAMINO HILLS DRIVE TRAP SIG - FARADAY AVENUE AND ORION STREET TRAP SIG - FARADAY AVENUE AND PRIESTLY DRIVE TRAP SIG - FARADAY AVENUE AND RUTHERFORD ROAD TRAP SIG - LA COSTA AVENUE AND ESFERA STREET TRAP SIG - LA COSTA AVENUE AND LEVANTE TRAP SIG - LA COSTA AVENUE/NUEVA CASTILLA TRAP SIG - MELROSE DRIVE AND LA COSTA AVENUE TRAP SIG - MONROE STREET AND HOSP WAY TRAP SIG - PALOMAR AIRPORT ROAD AND MELROSE DRIVE TRAP SIG - POINSETTIA LANE AND BLACKRAIL ROAD TRAP SIG - POINSETTIA LANE AND BRIGANTINE ROAD TRAP SIG - POINSETTIA LANE AND EL FUERTE STREET (REIMB) TRAP SIG - RANCHO SANTA FE ROAD AND AVENIDA LA CIMA TRAP SIG - RANCHO SANTA FE ROAD AND CALLE JUNIPERO TRAP SIG - RANCHO SANTA FE ROAD AND QUESTHAVEN ROAD TRAP SIG - TAMARACK AVE. AND PONTIAC DRIVE TRAP SIG - TAMARACK AVE. AND VALLEY STREET CLARY BATTERY BACKUP SYSTEMS/RED LED REPLACEMENTS VIDEO DETECTION CONVERSION FUNDING SOURCE GAS TAX OTHER GCC GCC GCC GAS TAX GAS TAX PFF GAS TAX IRF GCC GAS TAX TRANSNET-LOC IRF IRF GCC GCC TIF GAS TAX GCC GAS TAX GCC GCC GAS TAX GCC PFF GCC GCC PFF GCC GAS TAX GCC GCC GCC GAS TAX GAS TAX TOTAL BUDGET 210,000 862,649 260,000 105,000 210,000 190,000 190,000 150,000 210,000 230,000 210,000 210,000 1,311,000 206,000 141,000 190,000 190,000 289,550 303,050 190,000 190,000 210,000 190,000 190,000 210,000 250,000 210,000 190,000 210,000 190,000 210,000 124,767 210,000 190,000 201,550 1,850,000 FUTURE YEAR BUDGET AMOUNTS YEAR1 2007-08 210,000 190,000 201 ,550 67,000 YEAR 2 2008-2009 277,000 YEARS 2009-2010 190,000 247,000 YEAR 4 2010-2011 260,000 100,000 307,000 YEARS 2011-2012 300,000 YEAR 6-10 2012-2017 210,000 190,000 210,000 210,000 190,000 190,000 190,000 190,000 210,000 190,000 210,000 190,000 135,000 BUILDOUT 2017-2022 190,000 190,000 Page 170 CAPITAL PROJECT DESCRIPTION CIRCULATION SYSTEM TRAFFIC SIGNALS - ALGA ROAD AND CAZADERO DRIVE PROJECT NAME NONE PROJECT NO. PROJECT LOCATION MAP:PROJECT LOCATION: At the intersection of Alga Road and Cazadero Drive. PROJECT DESCRIPTION: Installation of a four-leg, fully actuated traffic signal, including a type 170 controller, 200SA local intersection control program, video detection, battery back-up system, appurtenant signing and striping, and signal interconnect to adjacent controllers. PROJECT NEED: Caltrans signal warrants have been met. The intersection is listed on the qualification list of the City's Traffic Signal Evaluation Policy. The installation of this traffic signal will assign the right-of-way for both motorists and pedestrians entering and crossing at the intersection. FINANCING: Purpose Design Construction Admin/Inspection Total Cost = Estimated Cost $8,000 $190,000 $12,000 $210,000 Funding Source Gas Tax Gas Tax Gas Tax ALGACAZA Page 171 CAPITAL PROJECT DESCRIPTION 3369 CIRCULATION SYSTEM TRAFFIC SIGNALS - AVIARA PARKWAY (POINSETTIA LANE TO EL CAMINO REAL) PROJECT NAME PROJECT NO. PROJECT LOCATION MAP:PROJECT LOCATION: At various intersections on Aviara Parkway between Poinsettia Lane and El Camino Real. PROJECT DESCRIPTION: Construct traffic signals and/or make minor drainage improvements to the following intersections with Aviara Parkway: 1. Nightshade Road - Traffic Signal 2. Tohee Lane - Traffic Signal PROJECT NEED: Signals needed to comply with Growth Management Standards. Traffic signals will be installed when they are warranted. Minor street improvements are needed to accommodate street drainage. Improvements will be constructed when Aviara Parkway is extended north of Poinsettia Lane. FINANCING: Purpose Design/Construction Design/Construction Total Cost = Estimated Cost Funding Source $862,649 $260,000 $1,122,649 Other GCC Original project cost estimated at $1,123,000. $763,000 expended in previous years for construction of existing traffic signals along Aviara Parkway. AVIATSIG Page 172 CAPITAL PROJECT DESCRIPTION 6300 CIRCULATION SYSTEM TRAFFIC SIGNALS - AVIARA PARKWAY AND CAMINO DE LAS ONDAS PROJECT NO. PROJECT NAME PROJECT LOCATION MAP:PROJECT LOCATION: Aviara Parkway and Camino de las Ondas. PROJECT DESCRIPTION: Installation of a fully-actuated traffic signal and appurtenant striping and signage. Developer of North Coast Calvary Chapel (MS 04-02) will design and construct signal and may apply for reimbursement of half the cost pursuant to a development condition for the project. PROJECT NEED: Required to provide safe ingress and egress to the Mariner's Point and North Coast Calvary Chapel developments. FINANCING: Purpose Estimated Cost Construction (Reimb.) $105,000 Total Cost = $105,000 Funding Source GCC Aviara_Ondas Page 173 CAPITAL PROJECT DESCRIPTION 6306 CIRCULATION SYSTEM TRAFFIC SIGNALS - CALLE BARCELONA AND PASEO AVELLANO PROJECT NAME PROJECT NO. PROJECT LOCATION MAP:PROJECT LOCATION: Intersection of Calle Barcelona and Paseo Avellano. PROJECT DESCRIPTION: Installation of a four-leg, fully actuated traffic signal, including a type 170 controller, 200SA local intersection control program, video detection, battery back-up system, appurtenant signing and striping, and signal interconnect to adjacent controllers. PROJECT NEED: A Caltrans traffic signal warrant has been met. The intersection is listed on the Traffic Signal Qualification List of the City's 2004 Traffic Signal Evaluation Policy. The installation of this traffic signal will assign the right-of-way for both motorists and pedestrians entering and crossing at this intersection. FINANCING: Purpose Design Construction Admin/Inspection Total Cost = Estimated Cost $8,000 $190,000 $12,000 $210,000 Funding Source GCC GCC GCC CALLEBARC Page 174 CAPITAL PROJECT DESCRIPTION CIRCULATION SYSTEM TRAFFIC SIGNALS - CAMINO DE LOS COCHES AND LA COSTA AVENUE PROJECT NAME NONE PROJECT NO. PROJECT LOCATION MAP: SIGNAL LOCATION PROJECT LOCATION: Intersection of Camino de los Coches and La Costa Avenue. PROJECT DESCRIPTION: Installation of a four-leg, fully actuated traffic signal, including a type 170 controller, 200SA local intersection control program, video detection, battery back-up system, appurtenant signing and striping, and signal interconnect to adjacent controllers. PROJECT NEED: Needed to comply with Growth Management Standards. Installation will occur when traffic signal warrants are met. The installation of this traffic signal will assign the right-of-way for both motorists and pedestrians entering and crossing at the intersection. FINANCING: Purpose Design Construction Admin/Inspection Total Cost = Estimated Cost Funding Source $8,000 $170,000 $12,000 $190,000 Gas Tax Gas Tax Gas Tax CAMINODE Page 175 CAPITAL PROJECT DESCRIPTION CIRCULATION SYSTEM TRAFFIC SIGNALS - CAMINO VIDA ROBLE AND YARROW DRIVE PROJECT NAME NONE PROJECT NO. PROJECT LOCATION MAP: SIGNAL LOCATION PROJECT LOCATION: Intersection of Camino Vida Roble and Yarrow Drive. PROJECT DESCRIPTION: Installation of a three-leg, fully actuated traffic signal, including a type 170 controller, 200SA local intersection control program, video detection, battery back-up system, appurtenant signing and striping, and signal interconnect to adjacent controllers. PROJECT NEED: Needed to comply with Growth Management Standards and traffic signal warrants. Installation will occur when traffic signal warrants are met. The installation of this traffic signal will assign the right-of-way for both motorists and pedestrians entering and crossing at the intersection. FINANCING: Purpose Design Construction Admin/Inspection Total Cost = Estimated Cost Funding Source $8,000 $170,000 $12,000 $190,000 Gas Tax Gas Tax Gas Tax CAMINOYA Page 176 CAPITAL PROJECT DESCRIPTION CIRCULATION SYSTEM TRAFFIC SIGNALS - CANNON ROAD AND AVENIDA ENCINAS PROJECT NAME 3902 PROJECT NO. PROJECT LOCATION MAP: AIRPORT RD. PROJECT LOCATION: Intersection of Cannon Road and Avenida Encinas, immediately west of Interstate 5. PROJECT DESCRIPTION: Installation of a 5-phase, fully actuated traffic signal, including a Type 170 controller, 176 intersection control program and minor intersection improvements. PROJECT NEED: Needed to comply with Growth Management Standards. Installation will occur when traffic signal warrants are met. FINANCING: Purpose Estimated Cost Funding Source Design/Construction $150,000 PFF Total Cost = $150,000 CANNON1 Page 177 CAPITAL PROJECT DESCRIPTION CIRCULATION SYSTEM TRAFFIC SIGNALS - CANNON ROAD AND COLLEGE BOULEVARD PROJECT NAME NONE PROJECT NO. PROJECT LOCATION MAP: r—<^ <V CALAVERA PROJECT LOCATION: Intersection of Cannon Road and College Boulevard. PROJECT DESCRIPTION: Installation of a four-leg, fully actuated traffic signal, including a type 170 controller, 200SA local intersection control program, video detection, battery back-up system, appurtenant signing and striping, and signal interconnect to adjacent controllers. PROJECT NEED: Needed to comply with Growth Management Standards. Installation will occur when traffic signal warrants are met. The installation of this traffic signal will assign the right-of-way for both motorists and pedestrians entering and crossing at the intersection. FINANCING: Purpose Design Construction Admin/Inspection Total Cost = Estimated Cost Funding Source $8,000 $190,000 $12,000 $210,000 Gas Tax Gas Tax Gas Tax CANNON2 Page 178 CAPITAL PROJECT DESCRIPTION CIRCULATION SYSTEM TRAFFIC SIGNALS - CARLSBAD BOULEVARD AND TAMARACK AVENUE SIGNAL REPAIRS PROJECT NAME 6301 PROJECT NO. PROJECT LOCATION MAP:PROJECT LOCATION: Carlsbad Boulevard and Tamarack Avenue. PROJECT DESCRIPTION: Remove and replace all traffic signal equipment including signal controller/cabinet, signal poles and mast arms, vehicle and signal indications, conduit and conductors. Existing electrical service cabinet is adequate and does not need to be replaced. Install video detection and UPS battery back-up systems. PROJECT NEED: Due to age of equipment and proximity to ocean, the existing signal equipment is badly corroded and in need of replacement. Underground conduit is corroded and overfilled, making repair/maintenance work difficult. FINANCING: Purpose Design Construction Admin/Inspection Total Cost = Estimated Cost $5,000 $201,500 $23,500 $230,000 Funding Source IRF IRF IRF Cbad Tarn Page 179 CAPITAL PROJECT DESCRIPTION 3917 CIRCULATION SYSTEM TRAFFIC SIGNALS - CARLSBAD VILLAGE DRIVE AND GLASGOW DRIVE PROJECT NO. PROJECT NAME PROJECT LOCATION MAP: Cm OF OC_EANSIDE_ OF CARLSBAD SIGNAL LOCATION PROJECT LOCATION: At the intersection of Carlsbad Village Drive and Glasgow Drive. PROJECT DESCRIPTION: Installation of a four-leg, fully-actuated traffic signal, including a Type 170E controller, 200SA local intersection control program, video detection, battery back-up system, appurtenant signing and striping, and signal interconnect to adjacent controllers at Carlsbad Village Drive (CVD) and Tamarack Avenue and Carlsbad Village Drive and College Boulevard. PROJECT NEED: The adjacent intersection to the west (CVD/Tamarack) is currently signalized and the adjacent intersection to the east (CVD/College) will be signalized upon the completion of College Boulevard south of CVD. Due to the increase in vehicular volume, Caltrans Traffic Signal Warrant #7 (Systems Warrant) is projected to be satisfied after the aforementioned extension of College Boulevard. FINANCING: Purpose Design Construction Admin/Inspection Total Cost = Estimated Cost $8,000 $180,000 $22,000 $210,000 Funding Source GCC GCC GCC Annual Operating Cost: $5,000 CVD_glas Page 180 CAPITAL PROJECT DESCRIPTION NONE CIRCULATION SYSTEM TRAFFIC SIGNALS - COLLEGE BOULEVARD AND CARLSBAD VILLAGE DRIVE PROJECT NAME PROJECT NO. PROJECT LOCATION MAP:PROJECT LOCATION: Intersection of College Boulevard and Carlsbad Village Drive. PROJECT DESCRIPTION: Installation of a four-leg, fully actuated traffic signal, including a type 170 controller, 200SA local intersection control program, video detection, battery back-up system, appurtenant signing and striping, and signal interconnect to adjacent controllers. PROJECT NEED: Needed to comply with Growth Management Standards. Installation will occur when traffic signal warrants are met. The installation of this traffic signal will assign the right-of-way for both motorists and pedestrians entering and crossing at the intersection. FINANCING: Purpose Design Construction Admin/Inspection Total Cost = Estimated Cost Funding Source $8,000 $190,000 $12,000 $210,000 Gas Tax Gas Tax Gas Tax COL_CVD Page 181 CAPITAL PROJECT DESCRIPTION CIRCULATION SYSTEM TRAFFIC SIGNALS - EL CAMINO REAL / PLAZA DRIVE / MARRON ROAD / HOSP WAY PROJECT NAME 3899 PROJECT NO. PROJECT LOCATION MAP: SIGNAL LOCATION PROJECT LOCATION: Signalized intersections of El Camino Real and Plaza Drive, El Camino Real and Marron Road, and El Camino Real and Hosp Way. PROJECT DESCRIPTION: Design and rebuild existing signalized intersections to include all signal appurtenances and to meet ADA requirements. Repair concrete and rebuild a portion of Marron Road east of El Camino Real. PROJECT NEED: Underground signal facilities at this location have deteriorated to the point where conductors can no longer be pulled through the system. This project will reduce the need for future maintenance and restore the ability for maintenance crews to make future repairs should equipment become damaged or malfunction. Pull boxes and signal poles require location for installation of ADA pedestrian ramps. Replacing a cross-gutter in Marron Road will improve the driving conditions. FINANCING: Purpose Design Construction Total Cost = Estimated Cost $70,000 $1,241,000 $1,311,000 Funding Source TransNet-Local TransNet-Local ECRREHAB Page 182 CAPITAL PROJECT DESCRIPTION CIRCULATION SYSTEM TRAFFIC SIGNALS - EL CAMINO REAL AND CHESTNUT AVENUE SIGNAL REPAIRS PROJECT NAME 6302 PROJECT NO. PROJECT LOCATION MAP:PROJECT LOCATION: El Camino Real and Chestnut Avenue. PROJECT DESCRIPTION: Remove and replace all traffic signal equipment including signal controller/cabinet, electrical service enclosure, vehicle and signal indications, conduit and conductors. Install video detection and UPS battery back-up systems. Minor sidewalk repairs on northeast (including retaining wall) and southeast corners to provide minimum pedestrian clearance per ADA requirements. Existing poles/mast arms to remain. PROJECT NEED: Due to age of equipment, the existing signal equipment is badly corroded and in need of replacement. Underground conduit is corroded and overfilled, making repair/maintenance work difficult and also needs to be replaced. FINANCING: Purpose Design Construction Admin/Inspection Total Cost = Estimated Cost Funding Source $20,000 $167,500 $18,500 $206,000 IRF IRF IRF ECFLChest Page 183 CAPITAL PROJECT DESCRIPTION CIRCULATION SYSTEM TRAFFIC SIGNALS - EL CAMINO REAL AND TAMARACK AVENUE SIGNAL REPAIRS PROJECT NAME 6303 PROJECT NO. PROJECT LOCATION MAP: HWY 78 PROJECT LOCATION: El Camino Real and Tamarack Avenue. PROJECT DESCRIPTION: Remove and replace all underground conduit, conductors and pull boxes. Install video detection system and UPS battery back-up system. PROJECT NEED: Due to age of equipment, underground conduit is corroded and overfilled, making repairs/maintenance work difficult. Video detection and battery back-up system will be installed to bring signal operations up-to-date. FINANCING: Purpose Design Construction Admin/Inspection Total Cost = Estimated Cost Funding Source $4,000 $122,400 $14,600 $141,000 IRF IRF IRF ECRJTam Page 184 CAPITAL PROJECT DESCRIPTION NONE CIRCULATION SYSTEM TRAFFIC SIGNALS - EL FUERTE AND RANCHO PANCHO PROJECT NO. PROJECT NAME PROJECT LOCATION MAP: SIGNAL LOCATION PROJECT LOCATION: At the intersection of El Fuerte Street and Rancho Pancho. PROJECT DESCRIPTION: Installation of a three-leg, fully actuated traffic signal, including a controller and intersection control program, video detection, battery back-up, signal interconnect conduit, and appurtenant striping and signing. PROJECT NEED: The intersection is listed on the Traffic Signal Qualification List of the City's 2006 Traffic Signal Evaluation Policy. The installation of this traffic signal will assign the right-of-way for both motorists and pedestrians. FINANCING: Purpose Design Construction Inspection Total Cost = Estimated Cost $8,000 $171,000 $11,000 $190,000 Funding Source GCC GCC GCC ELFUERTE Page 185 CAPITAL PROJECT DESCRIPTION NONE CIRCULATION SYSTEM TRAFFIC SIGNALS - FARADAY AVENUE AND CAMINO HILLS DRIVE PROJECT NAME PROJECT NO. PROJECT LOCATION MAP:PROJECT LOCATION: Intersection of Faraday Avenue and Camino Hills Drive. PROJECT DESCRIPTION: Installation of a three-leg, fully actuated traffic signal, including a type 170 controller, 200SA local intersection control program, video detection, battery back-up system, appurtenant signing and striping, and signal interconnect to adjacent controllers. PROJECT NEED: A Caltrans traffic signal warrant has been met. The intersection is listed on the Traffic Signal Qualification List of the City's 2004 Traffic Signal Evaluation Policy. The installation of this traffic signal will assign the right-of-way for both motorists and pedestrians entering and crossing at this intersection. FINANCING: Purpose Design Construction Admin/Inspection Total Cost = Estimated Cost $8,000 $170,000 $12,000 $190,000 Funding Source GCC GCC GCC Faraday Page 186 CAPITAL PROJECT DESCRIPTION 6304 CIRCULATION SYSTEM TRAFFIC SIGNALS - FARADAY AVENUE AND ORION STREET PROJECT NO PROJECT NAME PROJECT LOCATION MAP:PROJECT LOCATION: At the intersection of the above named streets. PROJECT DESCRIPTION: Installation of a four-leg, fully actuated traffic signal, including a type 170 controller, 200SA local intersection control program, video detection, battery back-up system, appurtenant signing and striping, and signal interconnect to adjacent controllers. PROJECT NEED: Needed to comply with Growth Management Standards. The installation of this traffic signal will assign the right-of-way for both motorists and pedestrians entering and crossing at the intersection. FINANCING: Purpose Design Construction Admin/Inspection Total Cost = Estimated Cost Funding Source $8,000 $269,500 $12,000 $289,500 TIP TIP TIP FARAORIO Page 187 CAPITAL PROJECT DESCRIPTION CIRCULATION SYSTEM TRAFFIC SIGNALS - FARADAY AVENUE AND PRIESTLY DRIVE PROJECT NAME 3621 PROJECT NO. PROJECT LOCATION MAP:PROJECT LOCATION: At the intersection of Faraday Avenue and Priestly Drive. PROJECT DESCRIPTION: Installation of a three-leg, fully actuated traffic signal, including a type 170 controller, 200SA local intersection control program, video detection, battery back-up system, appurtenant signing and striping, and signal interconnect to adjacent controllers. PROJECT NEED: Caltrans signal warrants have been met. The intersection is listed on the qualification list of the City's Traffic Signal Evaluation Policy. The installation of this traffic signal will assign the right-of-way for both motorists and pedestrians entering and crossing at the intersection. FINANCING: Purpose Design Construction Admin/Inspection Total Cost = Estimated Cost $8,000 $273,050 $22,000 $303,050 Funding Source Gas Tax Gas Tax Gas Tax FDYPRIES Page 188 CAPITAL PROJECT DESCRIPTION NONE CIRCULATION SYSTEM TRAFFIC SIGNALS - FARADAY AVENUE AND RUTHERFORD ROAD PROJECT NAME PROJECT NO. PROJECT LOCATION MAP: SIGNAL LOCATION PROJECT LOCATION: At the intersection of Faraday Avenue and Rutherford Road. PROJECT DESCRIPTION: Installation of a four-leg, fully actuated traffic signal, including a type 170 controller, 200SA local intersection control program, video detection, battery back-up system, appurtenant signing and striping, and signal interconnect to adjacent controllers. PROJECT NEED: Caltrans traffic signal warrants have been met. The intersection is listed on the qualification list of the City's Traffic Signal Evaluation Policy. The installation of this traffic signal will assign the right-of-way for both motorists and pedestrians entering and crossing at the intersection. FINANCING: Purpose Design Construction Admin/Inspection Total Cost = Estimated Cost Funding Source $8,000 $170,000 $12,000 $190,000 GCC GCC GCC Faruthfd Page 189 CAPITAL PROJECT DESCRIPTION CIRCULATION SYSTEM TRAFFIC SIGNALS - LA COSTA AVENUE AND ESFERA STREET PROJECT NAME NONE PROJECT NO. PROJECT LOCATION MAP:PROJECT LOCATION: La Costa Avenue and Esfera Street. PROJECT DESCRIPTION: Installation of a three-leg, fully actuated traffic signal, including a type 170 controller, 200SA local intersection control program, video detection, battery back-up system, appurtenant signing and striping, and signal interconnect to adjacent controllers. PROJECT NEED: The installation of this traffic signal will assign the right-of-way for both motorists and pedestrians entering and crossing at the intersection. FINANCING: Purpose Design Construction Admin/Inspection Total Cost = Estimated Cost $8,000 $170,000 $12,000 $190,000 Funding Source Gas Tax Gas Tax Gas Tax La_costa Page 190 CAPITAL PROJECT DESCRIPTION CIRCULATION SYSTEM TRAFFIC SIGNALS - LA COSTA AVENUE AND LEVANTE STREET PROJECT NAME 3938 PROJECT NO. PROJECT LOCATION MAP:PROJECT LOCATION: La Costa Avenue and Levante Street. PROJECT DESCRIPTION: Installation of a three-leg, fully actuated traffic signal, including a type 170 controller, 200SA local intersection control program, video detection, battery back-up system, appurtenant signing and striping, and signal interconnect to adjacent controllers. PROJECT NEED: The installation of this traffic signal will assign the right-of-way for both motorists and pedestrians entering and crossing at the intersection. FINANCING: Purpose Design Construction Admin/Inspection Total Cost = Estimated Cost $8,000 $180,000 $22,000 $210,000 Funding Source GCC GCC GCC Lacosta_2 Page 191 CAPITAL PROJECT DESCRIPTION NONE CIRCULATION SYSTEM TRAFFIC SIGNALS - LA COSTA AVENUE AND NUEVA CASTILLA WAY PROJECT NAME PROJECT NO. PROJECT LOCATION MAP: SIGNAL LOCATION PROJECT LOCATION: Intersection of La Costa Avenue and Nueva Castilla Way. PROJECT DESCRIPTION: Installation of a four-leg, fully actuated traffic signal, including a type 170 controller, 200SA local intersection control program, video detection, battery back-up system, appurtenant signing and striping, and signal interconnect to adjacent controllers. PROJECT NEED: Caltrans traffic signal warrants have been met. The intersection is listed on the qualification list of the City's Traffic Signal Evaluation Policy. The installation of this traffic signal will assign the right-of-way for both motorists and pedestrians entering and crossing at the intersection. FINANCING: Purpose Design Construction Admin/Inspection Total Cost = Estimated Cost Funding Source $8,000 $170,000 $12,000 $190,000 GCC GCC GCC LCANueva Page 192 CAPITAL PROJECT DESCRIPTION CIRCULATION SYSTEM TRAFFIC SIGNALS - MELROSE DRIVE AND LA COSTA AVENUE PROJECT NAME NONE PROJECT NO. PROJECT LOCATION MAP: SIGNAL LOCATION PROJECT LOCATION: Intersection of Melrose Drive and La Costa Avenue. PROJECT DESCRIPTION: Installation of a four-leg, fully actuated traffic signal, including a type 170 controller, 200SA local intersection control program, video detection, battery back-up system, appurtenant signing and striping, and signal interconnect to adjacent controllers. PROJECT NEED: Needed to comply with Growth Management Standards. The installation of this traffic signal will assign the right-of-way for both motorists and pedestrians entering and crossing at the intersection. FINANCING: Purpose Design Construction Admin/Inspection Total Cost = Estimated Cost Funding Source $8,000 $170,000 $12,000 $190,000 Gas Tax Gas Tax Gas Tax MELROSE Page 193 CAPITAL PROJECT DESCRIPTION CIRCULATION SYSTEM TRAFFIC SIGNALS - MONROE STREET AND HOSP WAY PROJECT NAME NONE PROJECT NO. PROJECT LOCATION MAP: SIGNAL LOCATION PROJECT LOCATION: Intersection of Monroe Street and Hosp Way. PROJECT DESCRIPTION: Installation of a four-leg, fully actuated traffic signal, including a type 170 controller, 200SA local intersection control program, video detection, battery back-up system, appurtenant signing and striping, and signal interconnect to adjacent controllers. PROJECT NEED: A Caltrans traffic signal warrant has been met. The intersection is listed on the Traffic Signal Qualification List of the City's 2004 Traffic Signal Evaluation Policy. The installation of this traffic signal will assign the right-of-way for both motorists and pedestrians entering and crossing at this intersection. FINANCING: Purpose Design Construction Admin/Inspection Total Cost = Estimated Cost $8,000 $190,000 $12,000 $210,000 Funding Source GCC GCC GCC Monroe Page 194 CAPITAL PROJECT DESCRIPTION 3644 CIRCULATION SYSTEM TRAFFIC SIGNALS - PALOMAR AIRPORT ROAD AND MELROSE DRIVE PROJECT NAME PROJECT NO. PROJECT LOCATION MAP: SIGNAL LOCATION PROJECT LOCATION: Intersection of Palomar Airport Road and Melrose Drive. PROJECT DESCRIPTION: Installation of an 8-phase, fully actuated traffic signal, including a Type 170 controller and 176 intersection control program. Modify existing traffic signal to accommodate construction of north leg of Melrose Avenue. PROJECT NEED: Needed to comply with Growth Management Standards. FINANCING: Estimated Cost Funding SourcePurpose Design/Construction Admin/Inspection Total Cost = $200,000 $50,000 $250,000 PFF PFF PARMELRO Page 195 CAPITAL PROJECT DESCRIPTION 3939 CIRCULATION SYSTEM TRAFFIC SIGNALS - POINSETTIA LANE AND BLACK RAIL ROAD PROJECT NO PROJECT NAME PROJECT LOCATION MAP:PROJECT LOCATION: At the intersection of Poinsettia Lane and Black Rail Road. PROJECT DESCRIPTION: Installation of a four-leg, fully actuated traffic signal, including a type 170 controller, 200SA local intersection control program, video detection, battery back-up system, appurtenant signing and striping, and signal interconnect to adjacent controllers at Poinsettia Lane and Aviara Parkway and Poinsettia Lane and Ambrosia Lane. PROJECT NEED: Future traffic on Poinsettia Lane will increase once the roadway extends from its current terminus at Black Rail Road eastward to El Camino Real, thereby necessitating the installation of a traffic signal at this location. The installation of this traffic signal will assign the right-of-way for both motorists and pedestrians entering and crossing at the intersection. FINANCING: Purpose Design Construction Admin/Inspection Total Cost = Annual Operating Cost: = $5,000 Estimated Cost $8,000 $180,000 $22,000 $210,000 Funding Source GCC GCC GCC Poin_brr Page 196 CAPITAL PROJECT DESCRIPTION CIRCULATION SYSTEM TRAFFIC SIGNALS - POINSETTIA LANE AND BRIGANTINE ROAD PROJECT NAME NONE PROJECT NO. PROJECT LOCATION MAP:PROJECT LOCATION: Intersection of Poinsettia Lane and Brigantine Road. PROJECT DESCRIPTION: Installation of a three-leg, fully actuated traffic signal, including a type 170 controller, 200SA local intersection control program, video detection, battery back-up system, appurtenant signing and striping, and signal interconnect to adjacent controllers. PROJECT NEED: Required to accommodate the safe and efficient flow of traffic from Brigantine Drive onto Poinsettia Lane which is classified as a major arterial in the City's Circulation Element. The need for the signal is created by the development of adjacent properties. Early developing properties which do not trigger the construction of the signal are required to contribute a fair share contribution of the total cost to install the traffic signal. FINANCING: Purpose Design Construction Admin/Inspection Total Cost = Estimated Cost $8,000 $170,000 $12,000 $190,000 Funding Source GCC GCC GCC Poin_brig Page 197 CAPITAL PROJECT DESCRIPTION CIRCULATION SYSTEM TRAFFIC SIGNALS - POINSETTIA LANE AND EL FUERTE STREET PROJECT NAME 3946 PROJECT NO. PROJECT LOCATION MAP:PROJECT LOCATION: Intersection of Poinsettia Lane and El Fuerte Street. PROJECT DESCRIPTION: Installation of a four-leg, fully actuated traffic signal, including a type 170 controller, 200SA local intersection control program, video detection, battery back-up system, appurtenant signing and striping, and signal interconnect to adjacent controllers. PROJECT NEED: Needed to comply with Growth Management Standards. The installation of this traffic signal will assign the right-of-way for both motorists and pedestrians entering and crossing at the intersection. FINANCING: Purpose Design Construction Admin/Inspection Estimated Cost Funding Source $8,000 $180,000 $22,000 PFF PFF PFF Total Cost = $210,000 Annual Operating Cost: = $5,000 POINSET1 Page 198 CAPITAL PROJECT DESCRIPTION CIRCULATION SYSTEM TRAFFIC SIGNALS - RANCHO SANTA FE ROAD AND CALLE JUNIPERO (FORMERLY MELROSE DRIVE SOUTH) PROJECT NAME NONE PROJECT NO. PROJECT LOCATION MAP:PROJECT LOCATION: Intersection of Rancho Santa Fe Road and future Calle Junipero, formerly Melrose Drive South. PROJECT DESCRIPTION: Installation of a three-leg, fully actuated traffic signal, including a type 170 controller, 200SA local intersection control program, video detection, battery back-up system, appurtenant signing and striping, and signal interconnect to adjacent controllers. PROJECT NEED: Needed to comply with Growth Management Standards. The installation of this traffic signal will assign the right-of-way for both motorists and pedestrians entering and crossing at the intersection. FINANCING: Purpose Design Construction Admin/Inspection Total Cost = Estimated Cost Funding Source $8,000 $190,000 $12,000 $210,000 Gas Tax Gas Tax Gas Tax RSFMELRO Page 199 CAPITAL PROJECT DESCRIPTION CIRCULATION SYSTEM TRAFFIC SIGNALS - RANCHO SANTA FE ROAD AND AVENIDA LA CIMA PROJECT NAME 6307 PROJECT NO. PROJECT LOCATION MAP: PROJECT PROJECT LOCATION: At the intersection of Rancho Santa Fe Road and Avenida La Cima. PROJECT DESCRIPTION: Installation of a three-leg, fully actuated traffic signal, including a type 170 controller, 200 SA local intersection control program, video detection, battery backup, signal interconnect conduit and appurtenant striping and signing. PROJECT NEED: California MUTCD traffic signal warrants have been met. The intersection is listed on the Traffic Signal Qualification List of the City's 2006 Traffic Signal Evaluation Policy. The installation of this traffic signal will assign right-of-way for both motorists and pedestrians entering and crossing at this intersection. FINANCING: Purpose Design Construction Total Cost = Estimated Cost $8,000 $182,000 $190,000 Funding Source GCC GCC RSF LACIMA Page 200 CAPITAL PROJECT DESCRIPTION CIRCULATION SYSTEM TRAFFIC SIGNALS - RANCHO SANTA FE ROAD AND SAN ELIJO ROAD (FORMERLY QUESTHAVEN ROAD) PROJECT NAME 3406 PROJECT NO. PROJECT LOCATION MAP:PROJECT LOCATION: Intersection of Rancho Santa Fe Road and San Elijo Road, formerly Questhaven Road. PROJECT DESCRIPTION: Installation of a three-leg, fully actuated traffic signal, including a type 170 controller, 200SA local intersection control program, video detection, battery back-up system, appurtenant signing and striping, and signal interconnect to adjacent controllers. The City of San Marcos is responsible for 1/3 share of this signal. Staff will pursue a cost sharing agreement with the City of San Marcos. PROJECT NEED: Needed to comply with Growth Management Standards. The installation of this traffic signal will assign the right-of-way for both motorists and pedestrians entering and crossing at the intersection. FINANCING: Purpose Construction Total Cost = Estimated Cost Funding Source $124,767 GCC $124,767 RSFQUEST Page 201 CAPITAL PROJECT DESCRIPTION CIRCULATION SYSTEM TRAFFIC SIGNALS - TAMARACK AVENUE AND PONTIAC DRIVE PROJECT NAME 3940 PROJECT NO. PROJECT LOCATION MAP:PROJECT LOCATION: Intersection of Tamarack Avenue and Pontiac Drive. PROJECT DESCRIPTION: Installation of a three-leg, fully actuated traffic signal, including a type 170 controller, 200SA local intersection control program, video detection, battery back-up system, appurtenant signing and striping, and signal interconnect to adjacent controllers. PROJECT NEED: A Caltrans traffic signal warrant has been met. The intersection is listed on the Traffic Signal Qualification List of the City's 2004 Traffic Signal Evaluation Policy. The installation of this traffic signal will assign the right-of-way for both motorists and pedestrians entering and crossing at this intersection. FINANCING: Purpose Design Construction Admin/Inspection Total Cost = Estimated Cost $8,000 $180,000 $22,000 $210,000 Funding Source GCC GCC GCC Annual Operating Cost = $5,000 Tam&pont Page 202 CAPITAL PROJECT DESCRIPTION CIRCULATION SYSTEM TRAFFIC SIGNALS - TAMARACK AVENUE AND VALLEY STREET PROJECT NAME NONE PROJECT NO. PROJECT LOCATION MAP:PROJECT LOCATION: Intersection of Tamarack Avenue and Valley Street. PROJECT DESCRIPTION: Installation of a four-leg, fully actuated traffic signal, including a type 170 controller, 200SA local intersection control program, video detection, battery back-up system, appurtenant signing and striping, and signal interconnect to adjacent controllers. PROJECT NEED: A Caltrans traffic signal warrant has been met. The intersection is listed on the Traffic Signal Qualification List of the City's 2004 Traffic Signal Evaluation Policy. The installation of this traffic signal will assign the right-of-way for both motorists and pedestrians entering and crossing at this intersection. This is an elementary school pedestrian crossing. FINANCING: Purpose Design Construction Admin/Inspection Total Cost = Estimated Cost $8,000 $170,000 $12,000 $190,000 Funding Source GCC GCC GCC Tarn vail Page 203 CAPITAL PROJECT DESCRIPTION NONE CIRCULATION SYSTEM TRAFFIC SIGNALS - CLARY BATTERY BACK-UP SYSTEM/RED LED REPLACEMENT PROJECT NO. PROJECT NAME PROJECT LOCATION MAP: VARIOUS LOCATIONS PROJECT LOCATION: Various locations throughout the City. PROJECT DESCRIPTION: Fifth year of a six-year program to purchase and install a traffic signal battery back-up system at signalized intersections. A total of 73 back-up systems will be installed at the completion of the program. PROJECT NEED: These units eliminate the need for temporary traffic control by maintaining a safe operating environment during a power failure. FINANCING: Purpose Construction Total Cost = Estimated Cost $201,550 $201,550 Funding Source Gas Tax Clary Page 204 CAPITAL PROJECT DESCRIPTION CIRCULATION SYSTEM TRAFFIC SIGNALS - VIDEO DETECTION CONVERSION PROJECT NAME 6305 PROJECT NO. PROJECT LOCATION MAP: N/A PROJECT LOCATION: Citywide. PROJECT DESCRIPTION: Convert existing traffic signal with video detection equipment along streets included in the Pavement Management Program projects. PROJECT NEED: Traffic signals are being converted to Video Detection to minimize impacts during future construction projects and to eliminate the cost associated with future loop replacements. FINANCING: Purpose Construction Total Cost = Estimated Cost $1,850,000 $1,850,000 Funding Source Gas Tax VIDEODET Page 205 STREET PROJECTS FUNDING MATRIX FOR STREET PROJECTS PROJ NO. 6004 6022 3922 3184 3814 6014 6016 3947 6000 3854 3919 3557 3636 3879 6006 3607 3643 3643 3909 3920 3929 3957 6009 6008 6010 6007 6007 FUND NO. 60041 60221 39221 31842 38141 60141 60161 39471 60001 38541 39191 35571 36362 38791 60061 36071 36431 36431 39091 39201 39291 39571 60091 60081 60101 60071 60072 PROJECT TITLE AVENIDA ENCINAS WIDENING - SOUTH OF PALOMAR AIRPORT ROAD BRIDGE PREVENTITIVE MAINTENANCE PLAN BTD#2/POINSETTIA LANE - REACH E (PARTIAL FUNDING) BTD#2/POINSETTIA LANE - REACHES A,B,C,F,G & AVIARA PKWY REIMS BTD#3 CANNON ROAD - FROST TO FARADAY (REIMB.) CANNON ROAD REACH 4B CARLSBAD BLVD BRIDGE CONCRETE BARRIER POWER PLANT CARLSBAD BLVD BRIDGE CONCRETE BARRIER RAILROAD CARLSBAD BLVD. AT BREAKWATER ROAD - LEFT TURN LANE CARLSBAD BLVD. AT STATE ST - INTERSECTION ENHANCEMENT DESIGN CARLSBAD BOULEVARD PEDESTRIAN ACCESS STUDY CARLSBAD BOULEVARD ENCINAS CREEK BRIDGE REPLACEMENT CARLSBAD BOULEVARD ENCINAS CREEK BRIDGE REPLACEMENT CARLSBAD BOULEVARD ENCINAS CREEK BRIDGE REPLACEMENT CARLSBAD BOULEVARD MEDIAN-TAMARACK AVENUE TO PINE AVENUE CARLSBAD BOULEVARD RETROFIT OVER SDNR CARLSBAD BOULEVARD WIDENING - CANNON TO MANZANO CARLSBAD VILLAGE DRIVE AND AVENIDA DE ANITA CARLSBAD VILLAGE DRIVE WIDENING COLLEGE BLVD REACH A AND CANNON REACH 4A COLLEGE/CANNON ASSESSMENT DISTRICT CONCRETE REPLACEMENT EL CAMINO REAL AND CARLSBAD VILLAGE DRIVE EL CAMINO REAL AND FARADAY AVENUE EL CAMINO REAL AT AVIARA PARKWAY/ALGA ROAD EL CAMINO REAL MEDIANS EL CAMINO REAL MEDIANS EL CAMINO REAL MEDIANS - LA COSTA EL CAMINO REAL WIDENING - LA COSTA AVENUE TO ARENAL ROAD EL CAMINO REAL WIDENING - LISA STREET TO CRESTVIEW DR (LOAN) EL CAMINO REAL WIDENING - NORTH OF COUGAR DRIVE (LOAN) EL CAMINO REAL WIDENING - S. CHESTNUT & S. ALGA EL CAMINO REAL WIDENING - TAMARACK AVENUE TO CHESTNUT AVE. EL CAMINO REAL WIDENING - TAMARACK AVENUE TO CHESTNUT AVE. EL FUERTE EXTENSION FARADAY AVENUE EXTENSION I-5 AND LA COSTA AVENUE AUXILLARY LANES MARBELLA WALL BEAUTIFICATION MELROSE DRIVE - SOUTH OF PALOMAR AIRPORT ROAD MELROSE DRIVE AND ALGA ROAD MELROSE DRIVE EXTENSION MELROSE DRIVE EXTENSION PALOMAR AIRPORT ROAD AND COLLEGE BOULEVARD FUNDING SOURCE TIP FED GRNT BTD*2 BTD#2 BTD*3 TRANSNET-HWY GCC GCC REDVL SCCRDA REDVL VILLAGE GCC REDVL SCCRDA FED GRNT TRANSNET-LOC GAS TAX TRANSNET-LOC TIF GCC TIF OTHER OTHER IRF TIF TIF TIF PFF GAS TAX PFF TIF TRANSNET-LOC TRANSNET-LOC TIF TIF TRANSNET-LOC OTHER OTHER CFD»1 GCC OTHER TIF OTHER OTHER TIF TOTAL BUDGET 983,000 100,000 1 1 ,050,000 1 ,320,729 6,194,747 1 ,761 ,000 1 ,300,000 277,000 243,150 100,000 105,000 339,135 2,161,260 279,640 2,041,080 1,519,000 2,449,063 105,000 1 ,542,042 1,713,002 10,314,481 1,243,350 346,770 1,235,941 305,591 909,500 1,452,058 90,500 550,497 959,000 493,000 522,115 1 ,382,708 3,300,000 4,095,146 16,248,065 2,000,000 80,000 228,938 587,342 1,525,584 3,477,792 173,385 FUTURE YEAR BUDGET AMOUNTS YEAR1 2007-08 100,000 600,000 140,000 257,000 305,429 39,571 105,000 3,300,000 80,000 YEAR 2 2008-2009 880,000 1,558,149 201 ,501 959,000 YEAR 3 2009-2010 1,600,000 YEAR 4 2010-2011 YEARS 2011-2012 YEAR 6-10 2012-2017 758,000 346,770 305,591 550,497 173,385 BUILDOUT 2017-2022 9,100,000 1 ,320,729 400,000 2,041,080 2,449,063 1 ,542,042 1,452,058 2,000,000 587,342 Page 206 FUNDING MATRIX FOR STREET PROJECTS (Continued) PRO) NO. 6012 6012 6011 3811 6001 6001 6001 6013 3689 3860 3190 3907 3880 6005 6002 6003 3895 FUND NO. 60121 60122 60111 38111 60011 60012 60011 60131 36892 38601 31906 39071 38801 60051 60021 60031 38951 PROJECT TITLE PALOMAR AIRPORT ROAD AND MELROSE DRIVE RIGHT TURN PALOMAR AIRPORT ROAD AND MELROSE DRIVE RIGHT TURN PALOMAR AIRPORT ROAD WIDENING AT MELROSE DRIVE PALOMAR AIRPORT ROAD WIDENING AT PASEO DEL NORTE PARK DRIVE, MARINA TO COVE PAVEMENT MANAGEMENT PROGRAM PAVEMENT MANAGEMENT PROGRAM PAVEMENT MANAGEMENT PROGRAM (NON-JURIS FEES) PAVEMENT MANAGEMENT CONCRETE REPAIR WORK POINSETTIA LANE EAST OF EL CAMINO REAL FINANCING PROGRAM POINSETTIA LANE WIDENING (PASEO DEL NORTE TO BATIQUITOS LN) RANCHO SANTA FE ROAD AND OLIVENHAIN IMPROVEMENTS RANCHO SANTA FE ROAD NORTH - PHASE I RANCHO SANTA FE ROAD NORTH - PHASE II (BRIDGE) RANCHO SANTA FE ROAD SOUTH SAN MARCOS ROAD PROJECT SIDEWALK/STREET CONSTRUCTION PROGRAM TAMARACK AND ADAMS TRAFFIC MONITORING PROGRAM UNDERGROUND DIST. 17 - HARDING, ROOSEVELT VALLEY AND MAGNOLIA SIDEWALKS VALLEY AND MAGNOLIA SIDEWALKS FUNDING SOURCE OTHER GAS TAX OTHER TIP GCC TRANSNET-LOC GAS TAX TRANSNET-LOC GAS TAX OTHER TIP RSF ROAD RSF ROAD RSF ROAD RSF ROAD GCC TIF GCC TIF GCC TIF TRANSNET-LOC TOTAL BUDGET 230,980 65,000 2,826,268 525,000 145,627 62,699,648 9,464,086 13,151,217 4,150,000 28,932,793 2,289,765 3,800,000 26,406,243 18,641,000 1 ,985,399 2,734,147 3,270,672 48,500 1,618,744 509,800 315,000 315,000 FUTURE YEAR BUDGET AMOUNTS YEAR1 2007-08 2,600,000 775,000 350,000 210,000 48,500 96,000 90,000 YEAR 2 2008-2009 2,650,000 750,000 350,000 75,000 96,000 225,000 315,000 YEAR 3 2009-2010 145,627 2,848,000 752,000 350,000 300,000 96,000 YEAR 4 2010-2011 4,732,800 762,000 350,000 300,000 96,000 YEARS 2011-2012 2,838,000 775,000 250,000 300,000 96,000 YEAR 6-10 2012-2017 14,065,000 3,935,000 1 ,250,000 900,000 540,000 BUILDOUT 2017-2022 12,246,500 3,935,000 1 ,000,000 2,289,765 432,000 Page 207 CAPITAL PROJECT DESCRIPTION CIRCULATION SYSTEM STREET PROJECTS - AVENIDA ENCINAS WIDENING SOUTH OF PALOMAR AIRPORT ROAD PROJECT NAME 6004 PROJECT NO. PROJECT LOCATION MAP:PROJECT LOCATION: Along the west side of Avenida Encinas south of Palomar Airport Road adjacent to the San Diego Northern Railway property. PROJECT DESCRIPTION: Widen the west side of Avenida Encinas to full secondary arterial standards from Palomar Airport Road to approximately 800 feet south. The work includes placement of fill material and construction of new curbs, gutters, aggregate base, asphalt paving and striping. PROJECT NEED: Required to comply with Growth Management Standards. FINANCING: Purpose Estimated Cost Funding Source Design/Construction $983,000 TIP Total Cost = $983,000 AVENIDA Page 208 CAPITAL PROJECT DESCRIPTION 6022 CIRCULATION SYSTEM STREET PROJECTS - BRIDGE PREVENTIVE MAINTENANCE PLAN PROJECT NO. PROJECT NAME PROJECT LOCATION MAP: VARIOUS LOCATIONS PROJECT LOCATION: Various locations throughout the City. PROJECT DESCRIPTION: The purpose of the Carlsbad Bridge Preventive Maintenance Plan is to inspect every bridge in the City in excess of a 20-foot span and identify preventative maintenance activities to increase the life of the structure. PROJECT NEED: The resulting Bridge Preventive Maintenance Plan will be submitted to Caltrans for possible future funding for identified preventive maintenance activities. FINANCING: Purpose Study Total Cost = Estimated Cost $100,000 $100,000 Funding Source Federal Grant BRDGMAINT Page 209 CAPITAL PROJECT DESCRIPTION CIRCULATION SYSTEM STREET PROJECTS - B&TD #2 POINSETTIA LANE REACH "E" (CASSIA ROAD TO SKIMMER COURT) PROJECT NAME 3922 PROJECT NO. PROJECT LOCATION MAP:PROJECT LOCATION: Along the future extension of Poinsettia Lane from its existing terminus at Cassia Road east to Skimmer Court. PROJECT DESCRIPTION: Partial funding for construction of Reach "E" of Poinsettia Lane including full width grading to major arterial standards, adequate drainage improvements necessary to protect the roadbed, and two 18-foot paved traffic lanes separated by a raised unimproved median. Also included within the project are all land acquisition and environmental mitigation costs. The project is part of the improvements funded by Bridge and Thoroughfare District No. 2 (B&TD#2). PROJECT NEED: Required pursuant to the City's Circulation Elements and Growth Management Program. FINANCING: Purpose Design/Construction Land Acquisition Total Cost = Estimated Cost $11,050,000 $11,050,000 Funding Source B&TD#2 B&TD#2E Page 210 CAPITAL PROJECT DESCRIPTION CIRCULATION SYSTEM STREET PROJECTS - BRIDGE AND THOROUGHFARE DISTRICT NO. 2 POINSETTIA LANE REACHES A. B, C. F. G & AVIARA PARKWAY REIMBURSEMENT PROJECT NAME NONE PROJECT NO. PROJECT LOCATION MAP:PROJECT LOCATION: Along Poinsettia Lane from the eastern Zone 19 boundary to El Camino Real. PROJECT DESCRIPTION: Reimbursement for construction of Reach A, B, C, F, & G of Poinsettia Lane and a portion of Aviara Parkway including full-width grading to major arterial standards, adequate drainage improvements necessary to protect the roadbed, and two 18-foot paved traffic lanes separated by a raised unimproved median. The project is part of the improvements funded by Bridge and Thoroughfare District No. 2 (B&TD#2). PROJECT NEED: Required to meet Growth Management Standards for future development within Local Facility Management Zone. FINANCING: Purpose Construction Total Cost = Estimated Cost Funding Source $1,320,729 B&TD #2 $1,320,729 AVIA_ECR Page 211 CAPITAL PROJECT DESCRIPTION CIRCULATION SYSTEM STREET PROJECTS - B&TD #3 - CANNON ROAD WEST FROST AVENUE TO FARADAY AVENUE (REIMBURSEMENT) PROJECT NAME 3184 PROJECT NO. PROJECT LOCATION MAP:PROJECT LOCATION: Cannon Road from Frost Avenue to Faraday Avenue. PROJECT DESCRIPTION: Reimbursement for the construction of a 4-lane major arterial road from Frost Avenue to Faraday Avenue. Work includes full width grading, curb and gutter, base and paving, raised landscaped median, sidewalks and streetlights. NOTE: Cannon Road West was constructed entirely by the adjacent land developer. The City may reimburse the developer for eligible work in accordance with a Council approved reimbursement agreement. PROJECT NEED: Required to comply with Growth Management Standards and to complete a vital arterial roadway identified in the Circulation Element of the General Plan. FINANCING: Purpose Construction Total Cost = Estimated Cost $6,194,747 $6,194,747 Funding Source B&TD #3 CANNWEST Page 212 CAPITAL PROJECT DESCRIPTION CIRCULATION SYSTEM STREET PROJECTS - CANNON ROAD REACH 4B COLLEGE BOULEVARD TO OCEANSIDE PROJECT NAME 3814 PROJECT NO. PROJECT LOCATION MAP:PROJECT LOCATION: Along Cannon Road from future College Boulevard to the Carlsbad/Oceanside city limits. PROJECT DESCRIPTION: Preliminary design of Reach 4 of Cannon Road to full major arterial standards, including all required environmental mitigation costs. PROJECT NEED: Required pursuant to the City Circulation Element and to comply with the Growth Management Circulation Standards. Since the project passes through the existing coastal sage habitat preserve area, it is not included as a financing requirement of any of the local facilities management plans. FINANCING: Purpose Preliminary Design Total Cost = Estimated Cost $1,761,000 $1,761,000 Funding Source TransNet Hwy Cannon34 Page 213 CAPITAL PROJECT DESCRIPTION CIRCULATION SYSTEM STREET PROJECTS - CARLSBAD BOULEVARD BRIDGE OVER POWER PLANT DISCHARGE CHANNEL PROJECT NAME 6014 PROJECT NO. PROJECT LOCATION MAP: AGUA HEDIONDA LAGOON PROJECT SITE PROJECT LOCATION: Carlsbad Boulevard north of Cannon Road over the power plant outlet channel. PROJECT DESCRIPTION: Installation of a concrete barrier on the existing bridge, provide a decorative fence to screen the existing power plant, and provide any needed repair of the bridge deck. Project may require relocation of a 12-inch water line, 4-inch HP gas line, and telephone conduit. PROJECT NEED: The existing bridge does not have a protective barrier protecting motorists in accordance with Caltrans standards. The edges of the existing bridge have extensive concrete flaking with exposed rebar. FINANCING: Purpose Design Environmental Property Acquisition Construction Admin/Inspection Total Cost = Estimated Cost $220,000 $15,000 $100,000 $800,000 $165,000 $1,300,000 Funding Source GCC GCC GCC GCC GCC CBPWRPLNT Page 214 CAPITAL PROJECT DESCRIPTION CIRCULATION SYSTEM STREET PROJECTS - CARLSBAD BOULEVARD BRIDGE OVER RAILROAD CONCRETE BARRIER PROJECT NAME 6016 PROJECT NO. PROJECT LOCATION MAP: BUENA VISTA LAGOON PROJECT LOCATION: Carlsbad Boulevard over the railroad tracks at State Street. PROJECT DESCRIPTION: Replace the existing decorative concrete barrier in accordance with Caltrans requirements. PROJECT NEED: The existing concrete barrier is in poor condition with concrete flaking, cracking and exposed rebar. FINANCING: Purpose Design Construction Admin/Inspection Total Cost = Estimated Cost $40,000 $200,000 $37,000 $277,000 Funding Source GCC GCC GCC CSBADBLVD Page 215 CAPITAL PROJECT DESCRIPTION CIRCULATION SYSTEM STREET PROJECTS - CARLSBAD BOULEVARD AND STATE STREET PEDESTRIAN AND INTERSECTION ENHANCEMENT DESIGN PROJECT NAME 6000 PROJECT NO. PROJECT LOCATION MAP: PROJECT SITE PROJECT LOCATION: Carlsbad Boulevard from north city limits to State Street. PROJECT DESCRIPTION: The project involves the study and design of a pedestrian walkway on the eastern side of Carlsbad Boulevard from State Street to the northern City limits. The feasibility study will review pedestrian/bicycle/vehicle access and safety issues along Carlsbad Boulevard, identify potential safety improvements, determine the scope of the environmental and operational impacts, and develop planning level cost estimates for the various options identified in the study. The project may also include intersection modifications at Carlsbad Boulevard and State Street to incorporate a traffic signal or stop control to assign right-of-way. The project will then complete design plans for the appropriate enhancements/improvements. PROJECT NEED: A pedestrian walkway is needed to provide separation between pedestrians and vehicles/bicycles traveling between Carlsbad and Oceanside along Carlsbad Boulevard. Modification of the Carlsbad Boulevard/State Street intersection and installation of traffic control devices will facilitate right-of-way assignment. FINANCING: Purpose Study/Report* Design Total Cost = "Complete Estimated Cost Funding Source $105,000 $100,000 $205,000 GCC Redvl Village Cbad_State Page 216 CAPITAL PROJECT DESCRIPTION CIRCULATION SYSTEM STREET PROJECTS - CARLSBAD BOULEVARD ENCINAS CREEK BRIDGE REPLACEMENT PROJECT NAME 3919 PROJECT NO. PROJECT LOCATION MAP: PROJECT PROJECT LOCATION: Southbound lanes of Carlsbad Boulevard south of Palomar Airport Road and north of the South Carlsbad State Beach campgrounds. PROJECT DESCRIPTION: Complete replacement of the existing bridge structure for southbound lanes of Carlsbad Boulevard originally constructed in 1913. The budget for this project includes staff time to pursue federal grants for funding of the project. PROJECT NEED: Carlsbad Boulevard is a major north/south transportation roadway in north county. The bridge structure does not meet seismic standards and is close to exceeding its expected service life. Reinforcing steel is exposed and corroding and Caltrans has recommended that the bridge be replaced. FINANCING: Purpose Studies & Reports Construction Construction Total Cost = Estimated Cost Funding Source $339,135 $2,161,260 $279,640 $2,780,035 SCCRDA Federal Grant TransNet Local ECbridge Page 217 CAPITAL PROJECT DESCRIPTION CIRCULATION SYSTEM STREET PROJECTS - CARLSBAD BOULEVARD MEDIAN TAMARACK AVENUE TO PINE AVENUE PROJECT NAME 3444 PROJECT NO. PROJECT LOCATION MAP:PROJECT LOCATION: Carlsbad Boulevard from Tamarack Avenue to Pine Avenue. PROJECT DESCRIPTION: Construct raised, landscaped median. Work includes concrete curb, landscaping, irrigation and colored, stamped concrete. PROJECT NEED: The median is needed to bring this section of Carlsbad Boulevard up to City Standards for a major arterial. FINANCING: Purpose Estimated Cost Funding Source Design/Construction $2,041,080 Gas Tax Total Cost = $2,041,080 CBMEDIAN Page 218 CAPITAL PROJECT DESCRIPTION CIRCULATION SYSTEM STREET PROJECTS - CARLSBAD BOULEVARD BRIDGE RETROFIT OVER SAN DIEGO NORTHERN RAILROAD PROJECT NAME 3557 PROJECT NO. PROJECT LOCATION MAP:PROJECT LOCATION: On Carlsbad Boulevard 500' southerly of its intersection with State Street. PROJECT DESCRIPTION: The project consists of retrofitting the existing 72 year old two-lane bridge and constructing a new four-lane bridge with bicycle lanes and sidewalks over the San Diego Northern Railroad. PROJECT NEED: Caltrans has determined that the bridge over the railroad is vulnerable to severe damage during the design earthquake. Caltrans and the Federal Highways Administration will fund a seismic retrofit of the bridge. FINANCING: Purpose Design Construction Total Cost = Estimated Cost Funding Source $500,000 $1,019,000 $1,519,000 TransNet/Local* TransNet/Local* * Funds totaling approximately $1,054,000 to be reimbursed from Federal and State Grants. RRbridge Page 219 CAPITAL PROJECT DESCRIPTION CIRCULATION SYSTEM STREET PROJECTS - CARLSBAD BOULEVARD WIDENING - CANNON ROAD TO MANZANO DRIVE PROJECT NAME NONE PROJECT NO. PROJECT LOCATION MAP: CANNON ROAD ) I v } a CEREZO DRIVE pa 0 a J v J sp^•^ pa MANZANO DRIVE §::: • PROJECT PROJECT LOCATION: Carlsbad Boulevard from Manzano Drive to Cannon Road. PROJECT DESCRIPTION: Widen Carlsbad Boulevard from two lanes to four lanes with a center raised median (major arterial). Construct pavement, curb and gutter, stamped concrete and landscaping. A planning study was initiated in 1992 to determine alignment alternatives and investigate property access problems. PROJECT NEED: Required to meet Growth Management Standards and the Circulation Element of the General Plan. FINANCING: Purpose Estimated Cost Funding Source Design/Construction $2,449,063 TIP Total Cost = $2,449,063 CBADWIDE Page 220 CAPITAL PROJECT DESCRIPTION 6017 CIRCULATION SYSTEM STREET PROJECTS - CARLSBAD VILLAGE DRIVE AND AVENIDA DE ANITA PROJECT NAME PROJECT NO. PROJECT LOCATION MAP:PROJECT LOCATION: Northwest corner of Carlsbad Village Drive and Avenida de Anita. PROJECT DESCRIPTION: Reconstruct Avenida de Anita as it approaches Carlsbad Village Drive to reduce the grade break at the intersection. PROJECT NEED: The project will reduce the grade break at the intersection and eliminate the damage to the roadway and large vehicles. NCTD experiences problems with their buses due to the grade break and may consider eliminating bus services to the general area. FINANCING: Purpose Design Construction Admin/Inspection Total Cost = Estimated Cost $22,000 $65,000 $15,000 $105,000 Funding Source GCC GCC GCC CVD ADA Page 221 CAPITAL PROJECT DESCRIPTION NONE CIRCULATION SYSTEM STREET PROJECTS - CARLSBAD VILLAGE DRIVE WIDENING PROJECT NO PROJECT NAME PROJECT LOCATION MAP:PROJECT LOCATION: On Carlsbad Village Drive from 200 feet east of Pontiac Drive to 200 feet east of Victoria Street. PROJECT DESCRIPTION: Widen Carlsbad Village Drive to secondary arterial standards; street is currently only half-width. Construct curb & gutter, sidewalk, streetlights, median curb, base and asphalt pavement. The project design may include standard modifications consistent with local environmental and topographical constraints of the project site. PROJECT NEED: Required to meet Growth Management Standards and the Circulation Element of the General Plan. FINANCING: Purpose Estimated Cost Funding Source Design/Construction $1,542,042 TIP Total Cost = $1,542,042 CVDWIDEN Page 222 CAPITAL PROJECT DESCRIPTION CIRCULATION SYSTEM STREET PROJECTS - COLLEGE BOULEVARD REACH A AND CANNON ROAD REACH 4A PROJECT NAME 3636 PROJECT NO. PROJECT LOCATION MAP: 'PROJECT PROJECT LOCATION: College Boulevard east of ECR from the existing College Boulevard terminus at Badger Lane to Cannon Road and Cannon Road from College Boulevard to approximately 1,200 foot east. PROJECT DESCRIPTION: Construction of the core improvements to College Boulevard from Badger Lane to Cannon Road and Cannon Road from College Boulevard to approximately 1,200 feet east of the College/Cannon intersection. The core improvements include full-width grading, two 18-foot paved travel lanes (one on each side of a raised unimproved median), median curbs, transition to full improvements at the intersection of College Boulevard and Cannon Road, drainage improvements to protect the road fill, a bridge structure across Sunny Creek, erosion control, environmental mitigation and Master Drainage Plan flood retention Basin BJ. The Basin BJ improvements include relocation of the existing private RV storage, maintenance facilities and community garden owned by the Rancho Carlsbad Mobile Home Park residents which currently occupy the proposed basin site. PROJECT NEED: The project is needed to comply with the City's Growth Management Plan and to complete the Circulation Element. FINANCING: Purpose Environmental Construction Total Cost = Estimated Cost $220,000 $1,493,002 $1,713,002 Funding Source Other (Developer) Other (Developer) CollegeA Page 223 CAPITAL PROJECT DESCRIPTION 3879 CIRCULATION SYSTEM STREET PROJECTS - COLLEGE BOULEVARD/CANNON ROAD REACH 3 ASSESSMENT DISTRICT PROJECT NAME PROJECT NO. PROJECT LOCATION MAP: LAKE CALAVERA PROJECT LOCATION: Along the extension of College Boulevard from Cannon Road to Carlsbad Village Drive and along the extension of Cannon Road from El Camino Real to College Boulevard. PROJECT DESCRIPTION: Formation of a financing district for the purpose of financing the construction of the above described sections of College Boulevard and Cannon Road. The improvements within the project jnclude full width grading of the College and Cannon roadways to major arterial standards, construction of the center two lanes separated by a raised unimproved median, installation of needed drainage improvements to protect the roadbed, and full width improvements of the arterial intersections with El Camino Real. The outside traffic lanes, fronting improvements and median landscaping/hardscaping will be the obligation of adjacent developing property owners. PROJECT NEED: The project is required to complete the Circulation Element of the Genera) Plan and to comply with the Growth Management Standard for circulation facilities. Financing for the project is required prior to any further development within Zones 7 and 14. Construction of the project may occur in phases consistent with the requirements of the various individual zone plans. FINANCING: Purpose Construction Total Cost = Estimated Cost $10,314,481 $10,314,481 Funding Source Assessment District B&TD 4 Page 224 CAPITAL PROJECT DESCRIPTION CIRCULATION SYSTEM STREET PROJECTS - CONCRETE REPLACEMENT PROJECT NAME 6006 PROJECT NO. PROJECT LOCATION MAP: HIGHWAY,_?S PROJEC' AKEA PROJECT LOCATION: Various locations in the northwest quadrant of the City. PROJECT DESCRIPTION: The project is designed to replace curb, gutter, sidewalk, and driveway approaches on those streets which will receive pavement overlay in Fiscal Year 06-07. There are over 700 locations which will be reconstructed as part of the project. PROJECT NEED: The concrete work occurs at locations where there is deterioration, cracking, and uplifting of existing concrete improvements. FINANCING: Purpose Construction Admin/Inspection Total Cost = Estimated Cost Funding Source $1,193,350 $50,000 $1,243,350 IRF IRF CONCRETE Page 225 CAPITAL PROJECT DESCRIPTION NONE CIRCULATION SYSTEM STREET PROJECTS - EL CAMINO REAL AND CARLSBAD VILLAGE DRIVE PROJECT NAME PROJECT NO. PROJECT LOCATION MAP: ECRCVDR x CARLSBAD VILLAGE DR. PROJECT LOCATION: At the intersection of El Camino Real and Carlsbad Village Drive. PROJECT DESCRIPTION: Construct northbound and southbound dual left-turn lanes on El Camino Real. PROJECT NEED: Required to meet Growth Management Standards. FINANCING: Purpose Estimated Cost Funding Source Construction $346,770 TIP Total Cost = $346,770 Page 226 CAPITAL PROJECT DESCRIPTION CIRCULATION SYSTEM STREET PROJECTS - EL CAMINO REAL AND FARADAY AVENUE PROJECT NAME 3607 PROJECT NO. PROJECT LOCATION MAP: I I FARADAY AVE. PROJECT LOCATION: The intersection of El Camino Real and Faraday Avenue. PROJECT DESCRIPTION: Intersection improvements which include adding three exclusive right turns (southbound, eastbound and westbound). Construct curb and gutter, asphalt pavement and sidewalk. Additional right-of-way will be required. PROJECT NEED: Required to meet Growth Management Standards. FINANCING: Purpose Admin/Inspection Design Construction Total Cost = Estimated Cost Funding Source $67,000 $33,000 $1,135,941 $1,235,941 TIF TIF TIF ECRFARAD Page 227 CAPITAL PROJECT DESCRIPTION NONE CIRCULATION SYSTEM STREET PROJECTS - EL CAMINO REAL AT AVIARA PARKWAY/ALGA ROAD PROJECT NAME PROJECT NO. PROJECT LOCATION MAP:PROJECT LOCATION: On El Camino Real at Aviara Parkway/Alga Road. PROJECT DESCRIPTION: Construction of median improvements and lane striping immediately south of Aviara Parkway/Alga Road to accommodate dual northbound to westbound turn lanes. May include modification to the existing traffic signal standards. PROJECT NEED: Required to comply with Growth Management Standards. FINANCING: Purpose Estimated Cost Funding Source Design/Construction $305,591 TIP Total Cost = $305,591 ECRAVIAR Page 228 CAPITAL PROJECT DESCRIPTION CIRCULATION SYSTEM STREET PROJECTS - EL CAMINO REAL MEDIANS PROJECT NAME 3643 & 3909 PROJECT NO. PROJECT LOCATION MAP:PROJECT LOCATION: At various locations along El Camino Real between the north and south City boundaries. PROJECT DESCRIPTION: Construct raised, landscaped medians at various places where no developer will be obligated to do so as a condition of a private development. Work includes median curb, stamped concrete paving, irrigation and landscaping. NOTE: Project funds may be used to reimburse developer for construction of median improvements in excess of those improvements required of the development. Currently, $100,000 is budgeted to reimburse the Evans Point developer for median improvements constructed adjacent to the Rancho Carlsbad Mobile Home Park. PROJECT NEED: Raised landscaped medians are required on prime arterials for vehicular safety and to meet City standards. FINANCING: Purpose Estimated Cost Funding Source Design/Construction $909,500 Design/Construction $1,452,058 PFF Gas Tax Total Cost =$1,361,558 ECRMDIAN Page 229 CAPITAL PROJECT DESCRIPTION CIRCULATION SYSTEM STREET PROJECTS - EL CAMINO REAL WIDENING LA COSTA AVENUE TO ARENAL ROAD PROJECT NAME NONE PROJECT NO. PROJECT LOCATION MAP: MOOCH PROJECT LOCATION: On the west side of El Camino Real from La Costa Avenue to Arenal Road. PROJECT DESCRIPTION: Add the southbound lane for a length of approximately 3,400 feet to widen the street to full prime arterial standards. Construct curb & gutter, sidewalk, base, and asphalt pavement and streetlights. PROJECT NEED: Required to comply with Growth Management Standards. FINANCING: Purpose Estimated Cost Funding Source Design/Construction $550,497 TIP Total Cost = $550,497 ECRLACOS Page 230 CAPITAL PROJECT DESCRIPTION CIRCULATION SYSTEM STREET PROJECTS - EL CAMINO REAL WIDENING - LISA STREET TO CRESTVIEW DRIVE PROJECT NAME NONE PROJECT NO. PROJECT LOCATION MAP: 'PROJECT SITE PAH PROJECT LOCATION: West side of El Camino Real from south of Lisa Street to Crestview Drive. PROJECT DESCRIPTION: Widening approximately 1,200 linear feet of roadway including construction of curb, gutter, sidewalks, pavement, median, and roadway rehabilitation on El Camino Real. PROJECT NEED: El Camino Real is identified in the SANDAG Congestion Management Plan (CMP) as a failing road. Adjacent property is fully developed. Widening this section of roadway will contribute to the City's CMP deficiency plan as mandated by the State. FINANCING: Purpose Design & Environmental Right-of-Way Construction Total Cost = Estimated Cost $82,000 $250,000 $627,000 $959,000 Funding Source *TransNet Local TransNet Local "TransNet Local 'Funding source may change if adjacent property develops or assessment districts are formed. ECR Lisa Page 231 CAPITAL PROJECT DESCRIPTION CIRCULATION SYSTEM STREET PROJECTS - EL CAMINO REAL WIDENING NORTH OF COUGAR DRIVE PROJECT NAME 3920 PROJECT NO. PROJECT LOCATION MAP: 'ROJECT SITE PROJECT LOCATION: East side of El Camino Real north of Cougar Drive. PROJECT DESCRIPTION: Widening approximately 250 linear feet of roadway including construction of curb, gutter, sidewalks, pavement, median, and roadway rehabilitation on El Camino Real. PROJECT NEED: El Camino Real is identified in the SANDAG Congestion Management Plan (CMP) as a failing road. Adjacent property is fully developed. Widening this section of roadway will contribute to the City's CMP deficiency plan as mandated by the State. FINANCING: Purpose Design & Environmental Right-of-Way Construction Total Cost = Estimated Cost $30,000 $60,000 $403,000 $493,000 Funding Source *TransNet Local TransNet Local TransNet Local *Funding source may change if adjacent property develops or assessment districts are formed. Elcamino Page 232 CAPITAL PROJECT DESCRIPTION CIRCULATION SYSTEM STREET PROJECTS - EL CAMINO REAL WIDENING TAMARACK AVENUE TO CHESTNUT AVENUE PROJECT NAME 3957 & 3929 PROJECT NO. PROJECT LOCATION MAP: PROJECT PROJECT LOCATION: Along El Camino Real from Tamarack Avenue to Chestnut Avenue. PROJECT DESCRIPTION: Add the outside lane to widen street to full prime arterial standards. Widen west side approximately 1,200 feet in length and east side approximately 600 feet in length. Construct curb & gutter, sidewalk, base, and asphalt pavement and streetlights. PROJECT NEED: To complete widening to prime arterial standards where no developers are likely to develop and to improve the road capacity. FINANCING: Purpose Design/Construction Construction Total Cost = Estimated Cost $1,904,823 $3,300,000 $5,204,823 Funding Source TIP TransNet Local ECRWIDE2 Page 233 CAPITAL PROJECT DESCRIPTION CIRCULATION SYSTEM STREET PROJECTS - FARADAY AVENUE/MELROSE DRIVE EXTENSIONS PROJECT NAME 3622, 6007, 6008.6011 PROJECT NO. PROJECT LOCATION MAP: OCEANSIDE PROJECT LOCATION: Along the extension of Melrose Drive from Palomar Airport Road to the Carlsbad/Vista city limit and along the extension of Faraday Avenue from Orion Way to Melrose Drive in Vista. PROJECT DESCRIPTION: Construction of two lanes of Faraday Avenue approximately 1.3 miles from its current terminus at Orion Way easterly to Melrose Drive in the City of Vista and the construction of four lanes of Melrose Drive approximately 0.3 miles from Palomar Airport Road to its current terminus at the Carlsbad/Vista city boundary. The project would include the reconstruction of a portion of existing Melrose Drive in the City of Vista and the construction of a bridge over the Agua Hedionda Creek along Faraday Avenue. PROJECT NEED: The project is required to complete the Circulation Element of the General Plan and to comply with the Growth Management Standard. The project will divert significant amounts of traffic from existing Palomar Airport Road by providing a second east/west arterial linkage from Melrose Drive to Interstate 5 through the core of the Carlsbad and Vista industrial centers. FINANCING: Purpose Estimated Cost Funding Source Design/Construction Design Design Total ++ Project Nos. 36224, 36225 +++Project Nos. 6007, 6008, 6011 $24,077,709 +++ $1,643,283 ++ $110,200 ++ $25,831,192 Other Water Connection Sewer Replacement FAR MELR Page 234 CAPITAL PROJECT DESCRIPTION CIRCULATION SYSTEM FREEWAY INTERCHANGE PROJECTS - INTERSTATE 5 AND LA COSTA AVENUE AUXILIARY LANES PROJECT NAME NONE PROJECT NO. PROJECT LOCATION MAP:PROJECT LOCATION: At the intersection of Interstate 5 and La Costa Avenue. PROJECT DESCRIPTION: The addition of auxiliary traffic lanes on Interstate 5 to be installed at the future direction of Caltrans. PROJECT NEED: Required to meet Growth Management Standards. FINANCING: Purpose Estimated Cost Funding Source Design/Construction $2,000,000 CFD #1 Total Cost = $2,000,000 I-5LACOS Page 235 CAPITAL PROJECT DESCRIPTION CIRCULATION SYSTEM STREET PROJECTS - MARBELLA WALL BEAUTIFICATION PROJECT NAME 6020 PROJECT NO. PROJECT LOCATION MAP:PROJECT LOCATION: La Costa Marbella Condominiums. PROJECT DESCRIPTION: Develop visual alternatives and estimated costs for the beautification of the newly constructed retaining wall. The project envisions hiring a consultant to prepare alternative architectural and landscape proposals. The project would include community outreach meetings. PROJECT NEED: The project would provide the City Council with alternative beautification proposals for the existing wall. Future additional appropriations would be necessary to implement the desired project. FINANCING: Purpose Study Total Cost = Estimated Cost Funding Source $80,000 GCC $80,000 Page 236 MARBELLA CAPITAL PROJECT DESCRIPTION CIRCULATION SYSTEM STREET PROJECTS - MELROSE DRIVE AND ALGA ROAD PROJECT NAME NONE PROJECT NO. PROJECT LOCATION MAP: pa i t-J ALGA ROAD PROJECT LOCATION: At the intersection of Melrose Drive and Alga Road. PROJECT DESCRIPTION: Construct dual left-turn lanes on all approaches to the intersections- northbound, southbound, eastbound and westbound. PROJECT NEED: Required to meet Growth Management Standards. FINANCING: Estimated Cost Funding Source $587,342 TIP $587,342 Purpose Design/Construction Total Cost = MELROALG Page 237 CAPITAL PROJECT DESCRIPTION NONE CIRCULATION SYSTEM STREET PROJECTS - PALOMAR AIRPORT ROAD AND COLLEGE BOULEVARD PROJECT NAME PROJECT NO. PROJECT LOCATION MAP: 3 PALOMAR AIRPORT ROAD PROJECT LOCATION: At the intersection of the Palomar Airport Road and College Boulevard. PROJECT DESCRIPTION: Construct dual left-turn lane on College Boulevard southbound to eastbound. Project work includes reconstruction of median improvements, striping and signal modifications. Additional right-of-way will be required. PROJECT NEED: Required to meet Growth Management Standards. FINANCING: Purpose Estimated Cost Funding Source Design/Construction $173,385 TIP Total Cost = $173,385 PARCOLLE Page 238 CAPITAL PROJECT DESCRIPTION CIRCULATION SYSTEM STREET PROJECTS - PALOMAR AIRPORT ROAD AND MELROSE AVENUE RIGHT-TURN LANE PROJECT NAME NONE PROJECT NO. PROJECT LOCATION MAP: CITY OF VISTA CITY OF CARLSBAD PROJECT LOCATION: Southwest corner of Palomar Airport Road and Melrose Avenue. PROJECT DESCRIPTION: Widening Palomar Airport Road to provide a right-turn lane to southbound Melrose Avenue. PROJECT NEED: The widening will accommodate a dedicated right-turn lane which will enable this leg of the intersection to operate at an acceptable level of service in the buildout condition. The construction will be performed by the developer and the city will reimburse 25% of the cost ($65,000) upon Council approval of an appropriate reimbursement agreement. FINANCING: Purpose Design/Construction Design/Construction* Design/Construction Estimated Cost $165,980 $65,000 $65,000 Funding Source CFD#2 Gas Tax Developer Total Cost = $295,980 *City responsible for 25% of construction costs. PAR MEL Page 239 CAPITAL PROJECT DESCRIPTION 3811 CIRCULATION SYSTEM STREET PROJECTS - PALOMAR AIRPORT ROAD WIDENING AT PASEO DEL NORTE PROJECT NAME PROJECT NO. PROJECT LOCATION MAP: PROJECT SITE PROJECT LOCATION: On the north side of Palomar Airport Road at the intersection with Paseo Del Norte. PROJECT DESCRIPTION: Widen the easterly approach of Palomar Airport Road (PAR) at the intersection of Paseo Del Norte (PDN) to accommodate an additional through lane. The added lane would be designed to align with the existing "right-turn only" lane onto northbound Interstate 5. The existing westbound to northbound right-turn lane from PAR to PDN would be relocated slightly north of its current location to eliminate the partial offset with the existing "right-turn only1 lane on the west side of the intersection. PROJECT NEED: Required to meet the Growth Management Circulation Standard. The current intersection is operating at an unacceptable level of service due to a backup of traffic attempting to go northbound along Interstate 5. This project will allow for smoother transition of the westbound to northbound traffic into the two right-turn lanes to northbound 1-5 from traffic proceeding westbound along PAR through the PDN intersection. FINANCING: Purpose Admin/Inspection Construction Total Cost = Estimated Cost $55,000 $480,000 $525,000 Funding Source TIP TIP Par_pdn Page 240 CAPITAL PROJECT DESCRIPTION CIRCULATION SYSTEM STREET PROJECTS - PARK DRIVE. MARINA DRIVE TO COVE DRIVE PROJECT NAME NONE PROJECT NO. PROJECT LOCATION MAP: SITE AGUA HEDICHDA LAGOCN PROJECT LOCATION: Westerly side of Park Drive between Marina Drive and Cove Drive. PROJECT DESCRIPTION: Reconstruct the westerly curb, gutter, and sidewalk along Park Drive between marina Drive and Cove Drive. PROJECT NEED: The project will improve the condition of this segment of roadway so it is consistent with the goal of providing a safe and efficient transportation system. FINANCING: Purpose Design Construction Admin/Inspection Total Cost = Estimated Cost Funding Source $25,000 $110,627 $10,000 $145,627 GCC GCC GCC Park_dr Page 241 CAPITAL PROJECT DESCRIPTION CIRCULATION SYSTEM STREET PROJECTS - PAVEMENT MANAGEMENT PROGRAM PROJECT NAME 6001 PROJECT NO. PROJECT LOCATION MAP: THROUGHOUT THE CITY PROJECT LOCATION: Throughout the City. PROJECT DESCRIPTION: The Pavement Management Program is an ongoing annual program designed to extend the service life of city streets and to maintain a smooth and safe driving surface for vehicles. The City utilizes a pavement management database program to determine pavement management needs for the purpose of establishing which streets are to be slurry sealed, overlaid, or reconstructed. On a periodic basis the condition of the roads are field surveyed and the pavement management database is updated to reflect current conditions. Each year, specific pavement management projects are defined and funding is transferred into a pavement management project account. PROJECT NEED: City streets require annual maintenance to maintain a safe and smooth driving surface and to extend the useful service life of the streets. FINANCING: Purpose Pavement Management Pavement Management Pavement Management Total Cost = Estimated Cost Funding Source $62,699,648 TransNet/Local* $9,464,086 Gas Tax $13,151,217 Other $85,314.951 Includes $49,993 balance forward from Project No. 38551. PVMTMGMT Page 242 CAPITAL PROJECT DESCRIPTION 6013 CIRCULATION SYSTEM STREET PROJECTS - PAVEMENT MANAGEMENT CONCRETE REPAIRS PROJECT NAME PROJECT NO. PROJECT LOCATION MAP: CITYWIDE PROJECT LOCATION: Citywide. PROJECT DESCRIPTION: Replace damaged pavement edges prior to conducting annual pavement management operations. Repairs include curb, gutter, and sidewalks adjacent to streets designated for asphalt rehabilitation. PROJECT NEED: Concurrent with the annual Pavement Management Program, concrete repair work is performed on those streets receiving a pavement overlay or slurry seal. The cost for concrete repair work was paid out of the annual appropriation for the Pavement Management Program. An annual appropriation for anticipated concrete repairs will allow for more streets to be included in the Pavement Management Program. FINANCING: Purpose Construction Total Cost = Estimated Cost Funding Source $4,150,000 Gas Tax $4,150,000 PVMT_MGT Page 243 CAPITAL PROJECT DESCRIPTION CIRCULATION SYSTEM STREET PROJECTS - POINSETTIA LANE EAST OF EL CAMINO REAL FINANCING PROGRAM PROJECT NAME 3689 PROJECT NO. PROJECT LOCATION MAP:PROJECT LOCATION: Along the future alignment of Poinsettia Lane from El Camino Real east to El Fuerte Street. PROJECT DESCRIPTION: Formation of a financing district/program to guarantee the construction of Poinsettia Lane to full major arterial standards west of El Camino Real. The project, in conjunction with the Poinsettia Lane improvements proposed west of El Camino Real, will complete another east/west arterial linkage from Melrose Drive to Interstate 5. PROJECT NEED: Required pursuant to the City Circulation Element and Growth Management Program. FINANCING: Purpose Construction Total Cost = Estimated Cost $28,932,793 $28,932,793 Funding Source Other POINEAST Page 244 CAPITAL PROJECT DESCRIPTION CIRCULATION SYSTEM STREET PROJECTS - POINSETTIA LANE WIDENING fPASEO DEL NORTE TO BATIQUITOS LANE) PROJECT NAME NONE PROJECT NO. PROJECT LOCATION MAP:PROJECT LOCATION: From Paseo Del Norte to Batiquitos Lane. PROJECT DESCRIPTION: Widen Poinsettia Lane from Paseo Del Norte to Batiquitos Lane to six lanes by adding one lane in each direction. Construct curb and gutter, base, asphalt pavement and sidewalk. Right-of-way is required. PROJECT NEED: Required to meet Growth Management Standards. FINANCING: Purpose Estimated Cost Funding Source Design/Construction $2,289,765 TIP Total Cost = $2,289,765 POINWIDE Page 245 CAPITAL PROJECT DESCRIPTION CIRCULATION SYSTEM STREETS PROJECTS - RANCHO SANTA FE ROAD AND OLIVENHAIN ROAD IMPROVEMENTS PROJECT NAME 3860 PROJECT NO. PROJECT LOCATION MAP: PROJECT PROJECT LOCATION: Intersection of Rancho Santa Fe Road and Olivenhain Road. PROJECT DESCRIPTION: Complete full intersection improvements to the Rancho Santa Fe Road and Olivenhain Road intersection to General Plan standards. Extend street improvements on Rancho Santa Fe Road between the Olivenhain Municipal Water District access to a distance approximately 200 feet east of the intersection with Olivenhain Road. Extend street improvements on Olivenhain Road from the intersection with Olivenhain Road west to meet existing full-width improvements within the City of Encinitas. The project would involve right-of-way acquisition, grading, storm drains, removal of existing improvements and installation of surface improvements, street lights, and coordination with agencies for utility realignment PROJECT NEED: These improvements are required in order to keep intersection capacity at or below the thresholds dictated by the Growth Management Standards and per the General Plan for build-out. Full intersection improvements will improve vehicular circulation and increase safety to serve the public and nearby developments to the south that will impact the intersection once full occupancy is reached. The City of Encinitas and Olivenhain Municipal Water District are in support of the project and will deposit funds with the City of Carlsbad for their share of the improvements. FINANCING: Purpose Estimated Cost Design/Construction $3,800,000 Total Cost = $3,800,000 Funding Source CFD#2 Olivenrsf Page 246 CAPITAL PROJECT DESCRIPTION CIRCULATION SYSTEM STREET PROJECTS - RANCHO SANTA FE ROAD NORTH PHASE I PROJECT NAME 3923 & 3190 PROJECT NO. PROJECT LOCATION MAP: PROJECT PROJECT LOCATION: Along the future alignment of Rancho Santa Fe Road from La Costa Avenue to approximately 1,800 feet south of Questhaven Road. PROJECT DESCRIPTION: Construction of 4 lanes of Rancho Santa Fe Road to prime arterial standards including full width grading. Project involves the realignment of Rancho Santa Fe Road easterly of its present alignment to a location approximately in the area of the current truck bypass route. PROJECT NEED: Required to meet Growth Management Standards. FINANCING: Purpose Estimated Cost Design/Construction $26,406,243 Total Cost = $26,406,243 Funding Source CFD#2 RSFN PHI Page 247 CAPITAL PROJECT DESCRIPTION CIRCULATION SYSTEM STREET PROJECTS - RANCHO SANTA FE ROAD NORTH PHASE II PROJECT NAME 3923 & 3907 PROJECT NO. PROJECT LOCATION MAP: PROJECT PROJECT LOCATION: Along Rancho Santa Fe Road from approximately 1,800 feet south of San Elijo Road to Melrose Drive. PROJECT DESCRIPTION: Realignment and widening of Rancho Santa Fe Road and construction of new bridge structures over the San Marcos Creek. PROJECT NEED: Required to meet Growth Management Standards. FINANCING: Estimated CostPurpose Design/Environmental Bridge Pipeline Replacement Total Cost = $3,100,000 $14,768,000 $773,000 $18,641,000 Funding Source CFD#2 CFD#2 Water Replacement RSFNPHII Page 248 CAPITAL PROJECT DESCRIPTION 3880 CIRCULATION SYSTEM STREET PROJECTS - RANCHO SANTA FE ROAD SOUTH (TO ENCINITAS) PROJECT NAME PROJECT NO. PROJECT LOCATION MAP: PROJECT PROJECT LOCATION: Along Rancho Santa Fe Road south from Olivenhain Road to Encinitas. PROJECT DESCRIPTION: Construction of Rancho Santa Fe Road to modified secondary arterial road standards including full width grading and necessary drainage facilities. PROJECT NEED: Required to meet Growth Management Standards for Zone 11 development. FINANCING: Purpose Estimated Cost Funding Source Design/Construction $1,985,399 CFD #2 Total Cost = $1,985,399 RSFSOUTH Page 249 CAPITAL PROJECT DESCRIPTION 6005 CIRCULATION SYSTEM STREET PROJECTS - SAN MARCOS BOULEVARD WIDENING PROJECT PROJECT NO. PROJECT NAME PROJECT LOCATION MAP: ^, PROJECT PROJECT LOCATION: The San Marcos Boulevard Widening Project extends from Acacia Drive to Rancho Santa Fe Road. PROJECT DESCRIPTION: The San Marcos Boulevard Widening Project consists of widening San Marcos Boulevard from the Acacia Drive intersection easterly to Rancho Santa Fe Road to prime arterial standards. The work includes three through lanes in the eastbound direction, an exclusive right-turn lane, a bike lane, raised landscaped median, retaining walls, curbs, gutters, sidewalks, traffic signal modification, storm drain, and streetlights. In addition, improvements will be made to the intersection of Rancho Santa Fe Road with San "Marcos Boulevard, including a new traffic signal system designed to current City of San Marcos standards for two northbound through lanes for Rancho Santa Fe Road, three eastbound through lanes for San Marcos Boulevard, two left-turn lanes from eastbound San Marcos Boulevard to northbound Rancho Santa Fe Road, and two left-turn lanes from northbound Rancho Santa Fe Road to westbound San Marcos Boulevard. There will also be a pavement overlay of San Marcos Boulevard from Rancho Santa Fe Road west within the project limits. PROJECT NEED: The San Marcos Boulevard widening from Acacia Drive to Rancho Santa Fe Road is integral to the Circulation Element Plans for San Marcos, and the North County Region in general; this project will improve a vital link in the North County Region's roadway network. The joint construction under one contract of San Marcos Boulevard Widening and the San Marcos Boulevard Transmission Main is desirable and in the best interest of CMWD and the City of San Marcos. FINANCING: Purpose Construction CM/lnspection Estimated Cost Funding Source $2,613,600 $120,547 GCC GCC Total Cost = $2,734,147 Construction funds will be reimbursed by the City of San Marcos. SANMARCOS Page 250 CAPITAL PROJECT DESCRIPTION 6002 CIRCULATION SYSTEM STREET PROJECTS - SIDEWALK/STREET CONSTRUCTION PROGRAM PROJECT NO PROJECT NAME PROJECT LOCATION MAP: N/A PROJECT LOCATION: Various streets throughout the City. PROJECT DESCRIPTION: The Sidewalk/Street Construction Program is an annual program designed to complete missing links of sidewalk throughout the City. In most cases, construction of the sidewalk improvements involve construction of adjacent street improvements to bring them into conformance with City Standards. Each year, several sidewalk/street projects are selected from the City's missing sidewalk priority list for inclusion into that year's sidewalk/street construction project. PROJECT NEED: Required to meet the pedestrian circulation policies of the Circulation Element of the General Plan. FINANCING: Purpose Estimated Cost Funding Source Design/Construction $3,270,672 TIP Total Cost = $3,270,672 SWCONPGM Page 251 CAPITAL PROJECT DESCRIPTION CIRCULATION SYSTEM STREET PROJECTS - TAMARACK AVENUE AND ADAMS STREET INTERSECTION IMPROVEMENT PROJECT NAME 6018 PROJECT NO. PROJECT LOCATION MAP: PROJECT PROJECT LOCATION: Northeast corner of Tamarack Avenue and Adams Street. PROJECT DESCRIPTION: Extend the existing sidewalk northerly on Adams Street, replace the existing pedestrian access ramp, relocate the existing signal pole, and install new crosswalk striping. PROJECT NEED: The project is needed to meet requirements of the Americans with Disabilities Act and provide a safe crossing for wheelchair-bound pedestrians. FINANCING: Purpose Design Construction Admin/Inspection Total Cost = Estimated Cost Funding Source $10,000 $33,000 $5,500 $48,500 GCC GCC GCC TAMARACK Page 252 CAPITAL PROJECT DESCRIPTION CIRCULATION SYSTEM STREET PROJECTS - TRAFFIC MONITORING PROGRAM PROJECT NAME 6003 PROJECT NO. PROJECT LOCATION MAP: N/A PROJECT LOCATION: Citywide. PROJECT DESCRIPTION: Perform traffic vehicle counts, analyze and report annually on adequacy of circulation system and identify any intersections or links that fail to meet Growth Management Standards. PROJECT NEED: To ensure that the circulation system meets Growth Management Standards. FINANCING: Purpose Estimated Cost Funding Source Field Counts/Reports $1,618,744 TIP Total Cost = $1,618,744 Annual Expenditures are approximately $96,000. TRAFFMON Page 253 CAPITAL PROJECT DESCRIPTION CIRCULATION SYSTEM STREET PROJECTS - UNDERGROUND UTILITY NO. 17 (ROOSEVELT STREET) PROJECT NAME 38951 PROJECT NO. PROJECT LOCATION MAP:PROJECT LOCATION: Roosevelt Street from Carlsbad Village Drive to Magnolia Avenue. PROJECT DESCRIPTION: Place all overhead utilities underground, including electric, telephone, and cable television lines. Work includes trenching, placing conduit and cable, restoring surface, and removal of existing poles and all overhead lines. PROJECT NEED: This project is identified on the City Council's adopted Underground Priority List. FINANCING: Purpose Design/Construction Street Lights Estimated Cost Funding Source $850,000 $509,800 20A Funds (SDG&E) GCC Total Cost = $1,359,800 20A Funds will be paid to project by SDG&E. UUD17 Page 254 CAPITAL PROJECT DESCRIPTION 6019 CIRCULATION SYSTEM STREET PROJECTS - VALLEY STREET AND MAGNOLIA AVENUE SIDEWALKS PROJECT NAME PROJECT NO. PROJECT LOCATION MAP: PROJECT SITE PROJECT LOCATION: Valley Street from Magnolia Avenue to Chestnut Street, and Magnolia Avenue from Valley Street northeast 470 feet. PROJECT DESCRIPTION: Construction of street widening and sidewalk improvements along portions of Valley Street and Magnolia Avenue in the vicinity of Carlsbad High School, Valley Middle School, and Magnolia Elementary School. PROJECT NEED: The street widening and sidewalks will construct missing pedestrian routes for students attending Carlsbad High School, Valley Middle School, and Magnolia Elementary School. FINANCING: Purpose Design Property Acquisition Construction Admin/Inspection Total Cost = Estimated Cost $65,000 $80,000 $390,000 $95,000 $630,000 Funding Source TIF TIF TIF TIF VALLEY Page 255