HomeMy WebLinkAbout; ; 2009-2010 CIP Technical Appendix; 2010-07-012009-2010 Capital Improvement ProgramTechnical Appendix 2009-10 to BuildoutC A L I F O R N I A INTRODUCTION The purpose of this Technical Appendix is to provide a brief description of the project scope, location and need for those projects approved in the City of Carlsbad 2009-10 Capital Improvement Program (CIP) Budget. Also included at the beginning of each project category is a funding matrix which identifies the proposed funding source(s), funding amounts and timing for each of the approved CIP projects included with the respective category. All projects with any current or future funding are listed. Most of the cost estimates included in this appendix are preliminary as detailed designs have not been completed. All costs are in current dollars, therefore, projects in future years should be anticipated to escalate over time to account for inflation. TABLE OF CONTENTS CIVIC PROJECTS Administrative Facility Projects Funding Matrix for Administrative Facility Projects ................................................................................................................... 1 Civic Center ............................................................................................................................................................................. 2 City Administration Training Facility .......................................................................................................................................... 3 Public Works Center ................................................................................................................................................................ 4 Police and Fire Facility Projects Funding Matrix for Police and Fire Facility Projects ................................................................................................................. 5 Fire Station No. 3 (Relocation) ................................................................................................................................................ 6 Joint First Responders Training Facility .................................................................................................................................... 7 Public Safety Information Technology Project .......................................................................................................................... 8 Library Facility Projects Funding Matrix for Library Facility Projects .............................................................................................................................. 9 Cole Library Expansion .......................................................................................................................................................... 10 Miscellaneous Projects Funding Matrix for Miscellaneous Projects ............................................................................................................................. 11 Community Facilities District #1 Administration ....................................................................................................................... 12 Coastal Rail Trail ..................................................................................................................................................................... 13 Proposition "C" Projects .......................................................................................................................................................... 14 Village Streetscape lmprovements .......................................................................................................................................... 15 Village Public Parking Enhancement Program ........................................................................................................................ 16 FACILITY MAINTENANCE PROJECTS Facility Maintenance Projects Funding Matrix for Facility Maintenance Projects ................................................................................................................... 17 Beach Access Repair/Upgrades ............................................................................................................................................. 18 Repair of Palomar Airport Bridge over Carlsbad Boulevard ..................................................................................................... 19 PARKS PROJECTS Citywide Parks Projects Funding Matrix for Citywide Parks Projects ............................................................................................................................ 20 Business Park Recreational Facility ....................................................................................................................................... 21 Lake Calavera Trails Master Plan ............................................................................................................................................ 22 Veteran's Memorial Park ......................................................................................................................................................... 23 Northwest Quadrant Parks Projects Funding Matrix for Northwest Quadrant Parks Projects ........................................................................................................... 24 Pine Avenue Park -Phase II (Community Building) ................................................................................................................ 25 Pine Avenue Park Phase 1-8 (Restroom/Storage Building) ................................................................................................... 26 Northeast Quadrant Parks Projects Funding Matrix for Northeast Quadrant Parks Projects .......................................................................................................... 27 Park Site Development ........................................................................................................................................................... 28 Southwest Quadrant Parks Projects Funding Matrix for Southwest Quadrant Parks Projects ......................................................................................................... 29 Aviara Community Park -Phase II (Community Building) ....................................................................................................... 30 Aviara Reimbursement Agreement ......................................................................................................................................... 31 Poinsettia Community Park -Phase Ill .................................................................................................................................... 32 Poinsettia Park Phase II -Parking Expansion ......................................................................................................................... 33 Southeast Quadrant Parks Projects Funding Matrix for Southeast Parks Projects ......................................................................................................................... 34 Alga Norte Park -Phase l ........................................................................................................................................................ 35 Alga Norte Park Phase II (Aquatics Center) ............................................................................................................................ 36 Leo Carrillo Park -Phase Ill ................................................................................................................................................... 37 Carrillo Ranch Phase Barn/Theater ......................................................................................................................................... 38 DRAINAGE PROJECTS Drainage Projects Funding Matrix for Drainage Projects ..................................................................................................................................... 39 Agua Hedionda Channel Improvements .................................................................................................................................. 40 Carlsbad Boulevard Encinas Creek Bridge Replacement ....................................................................................................... .41 Chestnut Avenue and Valley Street (Facility BCC) ................................................................................................................. .42 ii Drainage Projects (cont.) CMP Replacement Program .................................................................................................................................................... 43 College Boulevard Bridge Facility ............................................................................................................................................ 44 College Boulevard/Cannon Road (Calavera Creek Channel and Drainage Basin BJ) ............................................................ .45 Fire Stations 1-5 Drainage Improvements .............................................................................................................................. .46 Hosp Grove Park Drainage Improvements ............................................................................................................................. .47 Kelly Drive Channel Repair ..................................................................................................................................................... 48 La Costa Avenue Storm Drain Replacements ........................................................................................................................ .49 Marca Place Drainage Improvements ..................................................................................................................................... 50 Miscellaneous Master Drainage Facilities ................................................................................................................................ 51 Miscellaneous Road Subdrains ............................................................................................................................................... 52 NW Quadrant Storm Drain Improvement Program .................................................................................................................. 53 Park Drive and Tamarack Avenue Storm Drain ....................................................................................................................... 54 Park Drive Drainage and Street Improvements ....................................................................................................................... 55 Rancho Carrillo Water Seepage .............................................................................................................................................. 56 Ridgecrest Drainage Improvement .......................................................................................................................................... 57 Romeria Street Drainage Improvement ................................................................................................................................... 58 Tamarack and El Camino Real Storm Drain and Siltation Basin ............................................................................................. 59 SEWER PROJECTS Encina Water Pollution Control Facility Projects Funding Matrix for Encina Water Pollution Control Facility Projects ....................................................................................... 60 Building Improvements ........................................................................................................................................................... 61 Capital Acquisitions Replacement/Rehabilitation ..................................................................................................................... 62 Phase IV Expansion Debt Service ........................................................................................................................................... 63 Phase V Expansion .......................................................................................................................... : ...................................... 64 Sewer Collection System Projects Funding Matrix for Sewer Collection System Projects ............................................................................................................ 65 Avenida Encinas Gravity Sewer .............................................................................................................................................. 66 Beech Avenue Sewer Replacement ........................................................................................................................................ 67 Buena Interceptor Sewer Improvements ................................................................................................................................ 68 Demolition of Calavera Hills Treatment Plant .......... .' ............................................................................................................... 69 Carlsbad Trunk Sewer Reaches VCT1A, VCT1B, VCT1C ...................................................................................................... 70 Sewer Force Main/Siphon Condition Assessment ................................................................................................................... 71 Home Plant Pipeline and Lift Station Replacement ................................................................................................................. 72 La Costa Meadows Sewer Extension ...................................................................................................................................... 73 iii Sewer Collection System Projects {cont.} La Golondrina Sewer Extension .............................................................................................................................................. 7 4 North Agua Hedionda Trunk Sewer Reach NAHT1A. .............................................................................................................. 75 North Batiquitos Interceptor Rehabilitation ............................................................................................................................. 76 Poinsettia Sewage Lift Station Odor and Noise Abatement ..................................................................................................... 77 Removal of Existing Lift Stations ............................................................................................................................................. 78 Sewer Lift Station -Miscellaneous Repairs & Upgrades ......................................................................................................... 79 Sewer Line Refurbishment/Replacement ................................................................................................................................ 80 Master Plan/Connection Fee Update ....................................................................................................................................... 81 Sewer Monitoring Program ............................................................................................................................ ·; ........................ 82 Terramar Lift Station Replacement. ......................................................................................................................................... 83 Vista/Carlsbad Interceptor Agua Hedionda Lift Station (VC 12) ............................................................................................... 84 Vista/Carlsbad Interceptor Force Main (VC-4) ......................................................................................................................... 85 Vista/Carlsbad Interceptor Sewer Reach VC11 B ..................................................................................................................... 86 Vista/Carlsbad Interceptor Sewer Reaches VC13 to VC15 ..................................................................................................... 87 Vista/Carlsbad Interceptor Sewer Rehabilitation Reaches 1 thru 3 .......................................................................................... 88 WATER PROJECTS Water Distribution System Projects Funding Matrix for Water Distribution System Projects ........................................................................................................... 89 Aviara Parkway ...................................................................................................................................................................... 90 Buena Vista Pump Station Improvements ............................................................................................................................... 91 Calavera Hills Water Booster Station Standby Generator ....................................................................................................... 92 Carlsbad Boulevard South of Avenida Encinas ........................................ : .............................................................................. 93 Cathodic Protection Program .................................................................................................................................................. 94 College Boulevard -Cannon Road to Badger Lane ................................................................................................................ 95 College Boulevard (ECR to Cannon Road) ............................................................................................................................. 96 Crestview Drive Transmission Main ......................................................................................................................................... 97 "D" Reservoir-Phase II .......................................................................................................................................................... 98 D Reservoir Drainage Improvements ...................................................................................................................................... 99 Desalination Groundwater/Seawater Study ........................................................................................................................... 100 El Fuerte (North of Loker) .................................................................................................................................................... 101 El Fuerte and Corintia Street ................................................................................................................................................. 102 Ellery Water Pump Project .................................................................................................................................................... 103 Faraday Avenue Extension ................................................................................................................................................... 104 Groundwater Development in San Luis Rey River Basin ....................................................................................................... 105 iv Water Distribution System Projects ( cont.} Hydroelectric Renewable Energy Development. .................................................................................................................... 106 Kelly Ranch Domestic Water Pressure Reduction ................................................................................................................. 107 Lake Calavera Reservoir Improvements ............................................................................................................................... 108 Maerkle Facility Improvements .............................................................................................................................................. 109 Maerkle Pump Station ......................................................................................................................................................... 11 O Maerkle Reservoir Bridge Replacement ................................................................................................................................ 111 Maerkle Reservoir Storage (TAP #2) ................................................................................................................................... 112 Maerkle Reservoir Transmission Main ................................................................................................................................. 113 Marron Road (Pressure Regulating Station to Oceanside) ................................................................................................... 114 Master Plan Update .............................................................................................................................................................. 115 Melrose Drive I Palomar Airport Road to Faraday ................................................................................................................ 116 Miscellaneous Pipeline Replacements .................................................................................................................................. 117 Miscellaneous Water Reservoir Fencing ............................................................................................................................... 118 Miscellaneous Water Valve Repair/Replacement Program ................................................................................................... 119 Oceanside lntertie Upgrade .................................................................................................................................................. 120 Poinsettia Lane (El Camino Real to Skimmer Court) ............................................................................................................. 121 Poinsettia Lane (Skimmer Court to Cassia Road) ................................................................................................................ 122 Poinsettia Lane East of Black Rail Road ............................................................................................................................... 123 Pressure Reducing Stations Rehabilitation/Replacement ...................................................................................................... 124 Reservoir Repair/Maintenance Program Study ..................................................................................................................... 125 Tri-Agency Water Transmission Pipeline ............................................................................................................................. 126 Water System I ntertie Connection Stand by Generator ......................................................................................................... 127 Recycled Water Projects Funding Matrix for Recycled Water Projects ........................................................................................................................ 128 Carlsbad Water Recycling Facility Upgrades ........................................................................................................................ 129 Chestnut Avenue Recycled Water Line ................................................................................................................................ 130 El Camino Real and Tamarack RW Pump Station ................................................................................................................ 131 1-5 Crossing Avenida Encinas to Camino De Las Ondas ...................................................................................................... 132 1-5 Recycled Water Transmission Line ................................................................................................................................. 133 Pump Station Removal .......................................................................................................................................................... 134 Recycled Water Line -Business Park and Sea Cliff Development ...................................................................................... 135 Recycled Water Line -Innovation Way/Gateway Road ........................................................................................................ 136 Recycled Water Master Plan ................................................................................................................................................. 137 12" Recycled Water Transmission Main (CWRF) to Chinquapin Avenue .............................................................................. 138 V CIRCULATION SYSTEM PROJECTS Traffic Signal Projects Funding Matrix for Traffic Signal Projects -Sheet 1 .............................................................................................................. 139 Alga Road and Cazadero Drive ............................................................................................................................................. 140 Armada Drive and Grand Pacific Resorts ............................................................................................................................. 141 Aviara Parkway (Poinsettia Lane to El Camino Real) ........................................................................................................... 142 Aviara Parkway and Camino De Las Ondas .......................................................................................................................... 143 Calle Barcelona and Paseo Avellano ..................................................................................................................................... 144 Camino De Los Caches and La Costa Avenue .................................................................................................................... 145 Camino Vida Roble and Yarrow Drive .................................................................................................................................. 146 Cannon Road and Avenida Encinas ...................................................................................................................................... 147 Cannon Road and College Boulevard ................................................................................................................................... 148 Carlsbad Boulevard and Tamarack Avenue Signal Repairs .................................................................................................. 149 Carlsbad Boulevard and Cherry Street .................................................................................................................................. 150 El Camino Real and Chestnut Avenue Signal Repairs .......................................................................................................... 151 El Camino Real and Tamarack Avenue Signal Repairs ......................................................................................................... 152 El Fuerte and Rancho Pancho .............................................................................................................................................. 153 Faraday Avenue and Camino Hills Drive ............................................................................................................................... 154 Faraday Avenue and Palmer Way ......................................................................................................................................... 155 Faraday Avenue and Rutherford Road· .................................................................................................................................. 156 La Costa Avenue and Calle Madero ...................................................................................................................................... 157 La Costa Avenue and Esfera Street ...................................................................................................................................... 158 La Costa Avenue and Gibraltar Street ................................................................................................................................... 159 La Costa Avenue and Levante Street .................................................................................................................................... 160 La Costa Avenue and Nueva Castilla Way ............................................................................................................................ 161 Monroe Street and Hosp Way ............................................................................................................................................... 162 Paseo Del Norte and Harbor Point Road ............................................................................................................................... 163 Poinsettia Lane and Brigantine Road .................................................................................................................................... 164 Rancho Santa Fe Road and Avenida La Cima ...................................................................................................................... 165 Rancho Santa Fe Road and Calle Junipero (Formerly Melrose Drive South) ........................................................................ 166 Rancho Santa Fe Road and San Elijo Road (Formerly Questhaven Road) .......................................................................... 167 Tamarack Avenue and Pontiac Drive .................................................................................................................................... 168 Tamarack Avenue and Valley Street ..................................................................................................................................... 169 Video Detection Conversion .................................................................................................................................................. 170 vi Street Projects Funding Matrix for Street Projects ................................................................................................................................ 171-172 Avenida Encinas Widening South of Palomar Airport Road ................................................................................................. 173 Camino Hills Drive and Jackspar Drive Slope Stabilization .................................................................................................... 17 4 Cannon Road Reach 4 -College Boulevard to Oceanside ................................................................................................... 175 Carlsbad Boulevard Bridge over Power Plant Discharge Channel ......................................................................................... 176 Carlsbad Boulevard Bridge over Railroad Concrete Barrier. .................................................................................................. 177 Carlsbad Boulevard and State Street Pedestrian and Intersection Enhancement Design ..................................................... 178 Carlsbad Boulevard Realignment Study Phase 2 .................................................................................................................. 179 Carlsbad Boulevard and Palomar Airport Road Widening and Bridge Reconstruction .......................................................... 180 Carlsbad Boulevard Median Tamarack Avenue to Pine Avenue ............................................................................................ 181 Carlsbad Boulevard Widening -Mountain View Drive to Northerly City Limits ...................................................................... 182 Carlsbad Boulevard Bridge Retrofit over San Diego Northern Railroad ................................................................................. 183 Carlsbad Boulevard Widening -Cannon Road to Manzano Drive ......................................................................................... 184 Carlsbad Village Drive Widening ........................................................................................................................ _ ................... 185 Carlsbad Village Drive and Avenida De Anita ........................................................................................................................ 186 College Boulevard Reach A and Cannon Road Reach 4A .................................................................................................... 187 College Boulevard/Cannon Road Reach 3 Assessment District ............................................................................................ 188 Concrete Repair Program ..................................................................................................................................................... 189 El Camino Real and Cannon Road Intersection lmprovements ............................................................................................. 190 El Camino Real and Carlsbad Village Drive ......................................................................................................................... 191 El Camino Real and Tamarack Avenue Left-Turn Lane ........................................................................................................ 192 El Camino Real Medians ...................................................................................................................................................... 193 El Camino Real and Alga Road Right-Turn Lane .................................................................................................................. 194 El Camino Real Widening Cassia Road to Camino Vida Roble ............................................................................................. 195 El Camino Real Widening La Costa Avenue to Arenal Road ................................................................................................ 196 El Camino Real Widening -Lisa Street to Crestview Drive ................................................................................................... 197 El Camino Real Widening -North of Cougar Drive ............................................................................................................... 198 El Camino Real Widening Tamarack Avenue to Chestnut Avenue ....................................................................................... 199 El Fuerte Street Extension ................................................................................................................................................... 200 Interstate 5 and La Costa Avenue Auxiliary Lanes ................................................................................................................ 201 La Costa Avenue Slope Repair West of Romeria Street ...................................................................................................... 202 Marbella Wall Beautification .................................................................................................................................................. 203 Melrose Drive and Alga Road ............................................................................................................................................... 204 Melrose Drive Turn Lane to West Palomar Airport Road ....................................................................................................... 205 Palomar Airport Road and College Boulevard ...................................................................................................................... 206 Palomar Airport Road and Melrose Avenue Right-Turn Lane ................................................................................................ 207 Palomar Airport Road and Paseo Del Norte Left Turn Lane ................................................................................................. 208 Palomar Airport Road and Paseo Del Norte Right Turn Lane ............................................................................................... 209 Palomar Airport Road and El Fuerte Street Right-Turn Lane ................................................................................................ 210 vii Street Projects (cont.) Palomar Airport Road and El Camino Real Right -Turn Lane ............................................................................................... 211 Palomar Airport Road Widening at Paseo Del Norte ............................................................................................................. 212 Park Drive, Marina Drive to Cove Drive ................................................................................................................................. 213 Pavement Management Program .......................................................................................................................................... 214 Poinsettia Lane Reach "E" (Cassia Road to Skimmer Court) ................................................................................................ 215 Poinsettia Lane Reaches A, B, C, F, G, & Aviara Parkway Reimbursement.. ........................................................................ 216 Poinsettia Lane East of El Camino Real Financing Program ................................................................................................. 217 Poinsettia Lane Widening (Paseo Del Norte to Batiquitos Lane) ........................................................................................... 218 Rancho Santa Fe Road and Olivenhain Road Improvements ............................................................................................... 219 Rancho Santa Fe Road North Phase II ................................................................................................................................ 220 Valley Street and Magnolia Avenue Sidewalks ...................................................................................................................... 221 Sidewalk/Street Construction Program ................................................................................................................................. 222 Tamarack Avenue and Adams Street Intersection lmprovement.. ......................................................................................... 223 Traffic Calming Donna Drive ................................................................................................................................................. 224 Traffic Calming Sierra Moreno Avenue .................................................................................................................................. 225 Traffic Monitoring Program ................................................................................................................................................... 226 Underground District No. 17 (Roosevelt Street) .................................................................................................................... 227 viii CIVIC PROJECTS ADMINISTRATIVE FACILITY PROJECTS . FUNDING MATRIX FOR ADMINISTRATIVE FACILITIES PROJECTS FUTURE YEAR BUDGET AMOUNTS PROJ FUND FUNDING TOTAL PRIOR YEAR 1 YEAR2 YEAR3 YEAR4 YEARS YEAR 6-10 BUILDOUT NO. NO. PROJECT TITLE SOURCE BUDGET APPROP. 2009-2010 2010-2011 2011-2012 2012-2013 2013-2014 2014-2019 2019-2024 CIVIC CENTER CFD#1 26,100,000 0 26,100,000 4000 40001 CITY ADMIN TRAINING FACILITY (PRE-DESIGN) -PROP C GCC 100,000 0 100,000 3572 35721 PUBLIC WORKS CENTER CFD#1 17,080,366 2,708,266 14,372,100 3572 35722 PUBLIC WORKS CENTER WATERREPL 7,169,600 0 7,169,600 3655 36551 PUBLIC WORKS CENTER SEWERREPL 3,861,200 0 3,861,200 Page 1 PROJECT LOCATION MAP: 1/~ CITYHALL CAPITAL PROJECT DESCRIPTION ADMINISTRATIVE FACILITIES -CIVIC CENTER PROJECT NAME PROJECT LOCATION: El Camino Real and Faraday Avenue. PROJECT DESCRIPTION: NONE PROJECT NO. Redesign the existing 128,000 square foot "Farmers Building" at the intersection of El Camino Real and Faraday Avenue as a future City Hall and Council Chambers complex. Project will consolidate all administrative operations and facilities in one location for organizational and operational efficiency. Include 1 % for public art. PROJECT NEED: Required to meet Growth Management Standards. FINANCING: Purpose Design/Construction Total Cost= Estimated Cost $26, 100 I 000 $26,100,000 Funding Source CFD#1 Page2 CAPITAL PROJECT DESCRIPTION ADMINISTRATIVE FACILITIES -CITY ADMINISTRATION TRAINING FACILITY PROJECT NAME 4000 PROJECT NO. PROJECT LOCATION MAP: PROJECT LOCATION: TRAININGFACILITY At either the Carlsbad Safety Center or the Carlsbad Municipal Water District building. PROJECT DESCRIPTION: Prepare design plans and specifications for a citywide training facility. When not in use by City personnel, facility would be available for professional development courses, computer training, and/or provide educational conference and meeting facility space for public and private sector organizations and educational institutions. PROJECT NEED: Facility would provide facilities and services for employee development activities sponsored by the City for its employees. FINANCING: Purpose Pre-Design Total Cost= Estimated Cost $100,000 $100,000 Funding Source GCC Page 3 PROJECT LOCATION MAP: COMMSERV (Public Works Center) CAPITAL PROJECT DESCRIPTION 3572 & 3655 ADMINISTRATIVE FACILITIES -PUBLIC WORKS CENTER PROJECT NAME PROJECT NO. ~PROJF,r::T ~ SITE PROJECT LOCATION: Phase II of Safety & Service Center, Orion Way. PROJECT DESCRIPTION: Construction of the Public Works Center and associated improvements. The project includes office, shops, yard, warehouse, and parking to accommodate the Public Works MSA. The warehouse will also provide for citywide warehousing and storage. Additionally, the project increases Safety Center parking and includes funding for public art. PROJECT NEED: Required to meet Growth Management Standards. FINANCING: Purpose Design/Construction Design/Construction Design/Construction Total Cost= Estimated Cost $17,080,366 $3,861,200 $7,169,600 $28,111,166 Funding Source CFD#1 Sewer Replacement Water Replacement Page4 POLICE AND FIRE FACILITY PROJECTS FUNDING MATRIX FOR POLICE AND FIRE FACILITY PROJECTS FUTURE YEAR BUDGET AMOUNTS PROJ FUND FUNDING TOTAL PRIOR YEAR 1 YEAR2 YEAR3 YEAR4 YEARS YEAR 6-10 BUILDOUT NO. NO. PROJECT TITLE SOURCE BUDGET APPROP. 2009-2010 2010-2011 2011-2012 2012-2013 2013-2014 2014-2019 2019-2024 4003 40031 FIRE STATION #3 RELOCATION PFF 7,001,000 1,000,000 493,200 5,507,800 4003 40032 FIRE STATION #3 RELOCATION (GENERAL FUND) GCC 540,000 540,000 3686 36861 JOINT FIRST RESPONDERS TRAINING FACILITY GCC 10,850,000 10,850,000 3686 36862 JOINT FIRST RESPONDERS TRAINING FACILITY -PROP C GCC 13,650,000 13,650,000 3685 36851 POLICE CAD IMPLEMENTATION GCC 2,312,228 2,312,228 Page 5 FIRESTA3-2 Page 6 CAPITAL PROJECT DESCRIPTION 4003 POLICE AND FIRE FACILITIES - FIRE STATION NO. 3 (RELOCATION) PROJECT NO. PROJECT NAME PROJECT LOCATION MAP: PROJECT LOCATION: Within Robertson Ranch East near the intersection of Wind Trail Way and Four Peaks Street. PROJECT DESCRIPTION: This new station will be a 6,200 square foot suburban facility housing one 3-person engine company. Includes 1% cost for public art in compliance with Ordinance No. 1279. After relocation, the existing Fire Station No. 3 building and site will be sold. PROJECT NEED: Relocation of this fire station is required to ensure a five minute response time within the northeast quadrant of the City as development occurs. FINANCING: Purpose Estimated Cost Funding Source Environmental $158,000 PFF Design $468,000 PFF Construction $5,311,000 PFF Admin/Inspection $500,000 PFF Property Acquisition (1 ac.) $1,000,000 PFF/GCC FFE $104,000 PFF Total Cost = $7,541,000 CAPITAL PROJECT DESCRIPTION POLICE AND FIRE FACILITIES -JOINT FIRST RESPONDERS TRAINING FACILITY PROJECT NAME 3686 PROJECT NO. PROJECT LOCATION MAP: PROJECT LOCATION: FIRINGRANGE PROJECT SITE Adjacent to the Carlsbad Safety Center and Fire Station No. 5. PROJECT DESCRIPTION: Preparation of site and design plans and construction of a 25-lane shooting range, 4-story fire training tower, 2-story residential training prop, outdoor seating pavilion, and storage facilities. PROJECT NEED: Existing Police Training Range facility within Veterans Memorial Park was removed with the construction of "The Crossings" golf course project. FINANCING: Purpose Design/Construction Design/Construction Total Cost= Estimated Cost $10,850,000 $13,650,000 $24,500,000 Funding Source GCC GCC (Prop C) Page 7 CAPITAL PROJECT DESCRIPTION PUBLIC SAFETY INFORMATION TECHNOLOGY PROJECT PROJECT NAME 3685 PROJECT NO. ... ----------------------------------------------------... --------------------------------------------------..... PROJECT LOCATION MAP: NOT APPLICABLE CA Data PROJECT LOCATION: Safety Center. PROJECT DESCRIPTION: This project will replace Public Safety Information Technology applications and infrastructure. The first phase of this project was the replacement of a 16 year old Computer Aided Dispatch (CAD) system and the implementation of an 800 MHz radio data communication system. The second phase includes the installation of a Storage Area Network(SAN) and the implementation of Public Safety applications. PROJECT NEED: The primary purpose of the CAD system is to enable the police and fire departments to provide a timely response to emergency incidents. This supports Council Goal Strategic Goal of Top Quality Services by being able to provide timely responses that result in high customer satisfaction and improve work processes through the use of best technology and information. The implementation of the new CAD system allowed the police and fire departments to install computers in police vehicles, implement Automatic Vehicle Location(AVL), and integrate with the Citys mapping system. The installation of the SAN will allow for efficient use of storage and replication of critical Public Safety Data. FINANCING: Purpose Installation Total Cost= Estimated Cost $2,312,228 $2,312,228 Funding Source GCC Page 8 LIBRARY FACILITY PROJECTS FUNDING MATRIX FOR LIBRARY FACILITY PROJECTS FUTURE YEAR BUDGET AMOUNTS PROJ FUND FUNDING TOTAL PRIOR YEAR 1 YEAR2 YEAR3 YEAR4 YEARS YEAR 6-10 BUILDOUT NO. NO. PROJECT TITLE SOURCE BUDGET APPROP. 2009-2010 2010-2011 2011-2012 2012-2013 2013-2014 2014-2019 2019-2024 LIBRARY EXPANSION (COLE) CFD#1 4,763,217 0 4,763,217 LIBRARY EXPANSION (COLE) PFF 9,776,000 0 9,776,000 Page 9 PROJECT LOCATION MAP: EXP_COLE CAPITAL PROJECT DESCRIPTION LIBRARY FACILITIES -COLE LIBRARY EXPANSION PROJECT NAME PROJECT LOCATION: NONE PROJECT NO. At the site of the existing Cole Library, 1250 Carlsbad Village Drive, adjacent to the existing City Hall. PROJECT DESCRIPTION: Construction of a new 45, 155 square foot library on the present site, east of the existing library building. PROJECT NEED: The Library Master Plan calls for expansion of the Cole Library to meet the growth management standard at buildout. The 1998 Feasibility Study recommends replacement of the existing library with a 45, 155 square foot new building. This construction will satisfy the buildout growth management standard of 100,000+ square feet of library space. Project includes 1 % for public art. FINANCING: Purpose Design/Construction Design/Construction Total Cost= Estimated Cost $9,776,000 $4,763,217 $14,539,217 Funding Source PFF CFD#1 Page 10 MISCELLANEOUS CITYWIDE PROJECTS FUNDING MATRIX FOR MISCELLANEOUS CITYWIDE PROJECTS FUTURE YEAR BUDGET AMOUNTS PROJ FUND FUNDING TOTAL PRIOR YEAR 1 YEAR2 YEAR3 YEAR4 YEARS YEAR 6-10 BUILDOUT NO. NO. PROJECT TITLE SOURCE BUDGET APPROP. 2009-2010 2010-2011 2011-2012 2012-2013 2013-2014 2014-2019 2019-2024 CFD#1 ADMINISTRATION CFD#1 910,425 140,425 110,000 110,000 110,000 110,000 110,000 220,000 3455 34554 COASTAL RAIL TRAIL TRANSNET/BIKE 221,800 221,800 3455 34553 COASTAL RAIL TRAIL (CMAQ) FED GRANT 4,413,784 4,413,784 PROPOSITION C PROJECTS GCC 5,034,205 0 5,034,205 6015 60151 STREETSCAPEIMPROVEMENTS REDVL VILLAGE 400,000 100,000 300,000 3650 36501 VILLAGE PUBLIC PARKING ENHANCEMENT PROGRAM REDVL VILLAGE 850,000 0 850,000 Page 11 CAPITAL PROJECT DESCRIPTION NONE MISCELLANEOUS CITYWIDE PROJECTS -COMMUNITY FACILITIES DISTRICT #1 ADMINISTRATION PROJECT NAME PROJECT NO. PROJECT LOCATION MAP: N/A CFD#1ADM PROJECT LOCATION: NIA PROJECT DESCRIPTION: City costs to administer Communities Facilities District No. 1 (CFO #1 ). PROJECT NEED: Administration of Communities Facilities District No. 1 is needed to assure that the CFO #1 taxes are properly levied and collected in conformance with State law and to be certain that funding for the CFO #1 projects is available at the time of need for the various projects. FINANCING: Purpose Administration Total Cost= Estimated Cost Funding Source $910,425 $910,425 CFD#1 Page 12 PROJECT LOCATION MAP: Rl_trail CITY OF OCEANSIDE PACIFIC OCEAN CAPITAL PROJECT DESCRIPTION 3455 MISCELLANEOUS CITYWIDE PROJECTS -COASTAL RAIL TRAIL PROJECT NAME PROJECT NO. CITY OF ENCINITAS PROJECT LOCATION: Partially within the San Diego Northern Railroad (SDNRR) right-of-way between the northern and southern city limits. PROJECT DESCRIPTION: Construction of a 16-foot wide paved multi-modal bicycle/pedestrian trail including graded shoulders, landscaping, signage, safety devices at roadway crossings, bicycle loop detectors and other ancillary facilities. The Coastal Rail Trail through Carlsbad will be constructed in phases as funding allows. PROJECT NEED: The project accomplishes the Council goal of promoting multi-modal transportation facilities. The linking of four North County Coaster transit stations with a pedestrian/bicycle trail will encourage the use of non-motorized transport through the City, as well as to and from the transit stations. FINANCING: Purpose Design/Construction Design/Construction Estimated Cost $4,413,784 $221,800 Total Cost = $4,635,584 Funding Source CMAQ TransNet/Bike Page 13 CAPITAL PROJECT DESCRIPTION NONE MISCELLANEOUS CITYWIDE PROJECTS -PROPOSITION "C" PROJECTS PROJECT NO. PROJECT LOCATION MAP: N/A PROP C Projects PROJECT NAME PROJECT LOCATION: In miscellaneous locations throughout the City not specifically determined at this time. PROJECT DESCRIPTION': Spending of funds from various sources including the General Fund in an amount over $1 million to construct recreational facilities including a swimming pool complex, trails linkages and open space, a city safety training facility and a portion of Cannon Road east of College Boulevard. PROJECT NEED: Projects are needed for various reasons including compliance with growth management standards, compliance with General Plan Goals and Objectives and other community needs. The expenditure of funds for these projects from various sources including the General Fund were approved by a vote of the qualified voters of Carlsbad in a general election. FINANCING: Projects Allocation Original Set Aside $35,000,000 Aquatic Complex $16,215,795 City/Safety Training Facility $13,750,000 Cannon Road -Reach 4 $0 Trails/Open Space $0 Remaining Allocation $5,034,205 * Other funding sources may be substituted in lieu of GCC Funds as such fund sources become available. Page 14 CAPITAL PROJECT DESCRIPTION MISCELLANEOUS CITYWIDE PROJECTS -VILLAGE STREETSCAPE IMPROVEMENTS PROJECT NAME 6015 PROJECT NO. PROJECT LOCATION MAP: PROJECT LOCATION: VILLAGE PACIFIC OCEAN Various locations in Village Redevelopment Area. PROJECT DESCRIPTION: Develop a plan to facilitate streetscape and landscaping improvements at various locations within the Village Redevelopment Area. This project may include a diagonal or other parking study to determine the appropriateness of adding on-street parking. An implementation project would be added at a later date to the CIP budget. PROJECT NEED: The Council has indicated an interest in pursuing enhancements and revitalizing the Village Area. The program is intended to address this need and is included within the Village Redevelopment Implementation Plan for 2005 to 2009. FINANCING: Purpose Study Design Total Cost= Estimated Cost Funding Source $100,000 $300,000 $400,000 Village Redevelopment Village Redevelopment Page 15 CAPITAL PROJECT DESCRIPTION 3650 MISCELLANEOUS CITYWIDE PROJECTS -VILLAGE PUBLIC PARKING ENHANCEMENT PROGRAM PROJECT NAME PROJECT NO. PROJECT LOCATION MAP: VILLGPKG PACIFIC OCEAN PROJECT LOCATION: Within boundaries of Village Redevelopment Area. PROJECT DESCRIPTION: Implementation of recommendations within Village Parking Program, which include acquisition of land for future public parking, a study of impediments to full utilization of existing public parking lots, and improvements to existing public parking lots (as needed) to encourage full utilization of existing public parking lots. PROJECT NEED: Parking in the Village Redevelopment Area has been an issue for several years. A Village Parking Program will identify recommended actions to pursue to address the underutilization of existing public parking lots and to plan for future parking needs. The proposed projects are consistent with the needs to address parking in the Village. FINANCING: Purpose Land Acquisition Total Cost= Estimated Cost $850,000 $850,000 Funding Source Village Redevelopment Page 16 FACILITY MAINTENANCE PROJECTS FACILITY MAINTENANCE PROJECTS FUNDING MATRIX FOR FACILITIES MAINTENANCE PROJECTS FUTURE YEAR BUDGET AMOUNTS PROJ FUND FUNDING TOTAL PRIOR YEAR 1 YEAR2 YEAR3 YEAR4 YEARS YEAR 6-10 BUILDOUT NO. NO. PROJECT TITLE SOURCE BUDGET APPROP. 2009-2010 2010-2011 2011-2012 2012-2013 2013-2014 2014-2019 2019-2024 3896 38961 BEACH ACCESS STAIRS REPLACEMENT IRF 517,500 517,500 4700 47001 REPAIR RECOATING GUARDRAIL PAR BRIDGE AT CARLSBAD BLVD GCC 130,000 130,000 4700 47002 REPAIR RECOATING GUARDRAIL PAR BRIDGE AT CARLSBAD BLVD PROP 42 944,000 944,000 Page 17 PROJECT LOCATION MAP: BEACHACC2 CAPITAL PROJECT DESCRIPTION FACILITIES MAINTENANCE -BEACH ACCESS REPAIR/UPGRADES PROJECT NAME PROJECT LOCATION: 3896 PROJECT NO. Beach accesses at Christiansen Way, Beech Street, Carlsbad Village Drive, Grand Avenue, Rue Des Chateaux, and Tamarack Avenue. PROJECT DESCRIPTION: Provide major repairs to beach accesses, replace existing deteriorated beach access steps, railing, and foundations. Upgrade base (re-engineer) to withstand high surf conditions, use heavy aluminum for handrails to replace existing eroded galvanized metal. Beach access stairway improvements were recently completed at Cherry Avenue, Maple Avenue, and Sycamore Avenue. PROJECT NEED: Major repairs are required to keep the beach accesses in a long-term safe condition. These improvements will dramatically reduce the amount of labor and materials currently being expended on painting and maintenance of steps and handrails. FINANCING: Purpose Design Construction Adm in/Inspection Total Cost= Estimated Cost $37,000 $474,500 $6,000 $517,500 Funding Source IRF IRF IRF Page 18 PARBridge2 Page 19 CAPITAL PROJECT DESCRIPTION 4700 FACILITIES MAINTENANCE – REPAIR OF PALOMAR AIRPORT ROAD BRIDGE OVER CARLSBAD BOULEVARD PROJECT NO. PROJECT NAME PROJECT LOCATION MAP: PROJECT LOCATION: Palomar Airport Road bridges over Carlsbad Blvd and NCTD railroad tracks. PROJECT DESCRIPTION: Corroded railing, concrete curb and sidewalk will be replaced with a Caltrans standard concrete barrier and handrail. Concrete spot repairs and crack filling will occur on the pilasters and abutments. Sacrificial anodes and corrosion inhibitors will be applied to mitigate the corrosion process. Adjacent bridge over NCTD railroad right of way will be sealed with a deck treatment and minor concrete repairs will be made on the existing concrete barrier walls. PROJECT NEED: Existing bridge has severe corrosion on steel handrails. Cracks on concrete pilasters and abutments need to be repaired with epoxy mortar. FINANCING: Purpose Estimated Cost Funding Source Design $130,000 GCC Construction $944,000 Prop 42 Total Cost = $1,074,000 PARK PROJECTS CITYWIDE PARK PROJECTS FUNDING MATRIX FOR CITYWIDE PARKS PROJECTS FUTURE YEAR BUDGET AMOUNTS PROJ FUND FUNDING TOTAL PRIOR YEAR 1 YEAR2 YEAR3 YEAR4 YEARS YEAR 6-10 BUILDOUT NO. NO. PROJECT TITLE SOURCE BUDGET APPROP. 2009-2010 2010-2011 2011-2012 2012-2013 2013-2014 2014-2019 2019-2024 BUSINESS PARK RECREATIONAL FACILITY (PARTIAL FUNDING) ZONES 3,400,000 0 3,400,000 3866 38661 LAKE CALAVERA TRAILS MASTER PLAN/CONSTRUCTION GCC 598,750 598,750 VETERAN'S MEMORIAL PARK CFD#1 23,239,800 0 23,239,800 Page 20 CAPITAL PROJECT DESCRIPTION CITYWIDE PARKS PROJECTS -BUSINESS PARK RECREATIONAL FACILITY PROJECT NAME NONE PROJECT NO. PROJECT LOCATION MAP: PROJECT LOCATION: BUS_PARK In Zone 5, at the corner of Faraday and Camino Hills. PROJECT DESCRIPTION: In FY 98-99, the City acquired 13 acres to develop into the Business Park Recreation Facility. Proposed amenities may include a fitness center, ball fields, soccer fields, basketball, handball, volleyball courts, picnic areas, jogging trails, etc. It is anticipated staff will meet with the business park community to gather input into the most needed amenities. The City may explore privatization options for a portion of the development (e.g., the fitness center), which may accelerate development. Project includes 1 % for public art. PROJECT NEED: Demand and need for recreational facilities within the industrial area identified through a Parks and Recreation Commission subcommittee who conducted two independent surveys and received input from Zone 5, 13, and 16 developers. FINANCING: Purpose Estimated Cost Funding Source Design/Construction $3,400,000 Zone 5 Fee Total Cost= $3,400,000 Page 21 CAPITAL PROJECT DESCRIPTION CITYWIDE PARKS PROJECTS -LAKE CALAVERA TRAILS MASTER PLAN PROJECT NAME 3866 PROJECT NO. PROJECT LOCATION MAP: PROJECT LOCATION: Lake_cal In the Northeast Quadrant-Lake Calavera City Mitigation Site. PROJECT DESCRIPTION: Develop a Master Plan for a public multi-use, recreational trail system situated within a 266-acre property owned by the City. Trails to be developed as multi- purpose non-paved recreational trails with trailhead parking area, signage, benches, litter receptacles, interpretive signage and passive picnic areas. Project includes utilizing volunteers to construct approximately 2.5 miles of the proposed 5 miles of trails. PROJECT NEED: This project is part of the citywide trails program and trails in the Lake Calavera area have been identified in the City's Open Space and Conservation Resource Management Plan for the Lake Calavera area, as well as the Trails Feasibility Study done in 1990. Citizens surveys indicate the desire to have increased access to open space and trails. Voters approved Prop C in 2002 which identified trails as one of the recreational facilities they would support funding. FINANCING: Purpose Environmental Design Construction Total Cost= Estimated Cost $35,000 $50,000 $513,750 $598,750 Funding Source GCC GCC GCC Page 22 VETERAN Page 23 CAPITAL PROJECT DESCRIPTION NONE CITYWIDE PARKS PROJECTS - VETERAN’S MEMORIAL PARK PROJECT NO. PROJECT NAME PROJECT LOCATION MAP: PROJECT LOCATION: This property is located south and east of Agua Hedionda Lagoon, near the geographic center of Carlsbad. PROJECT DESCRIPTION: The Master Plan for development of Veteran's Memorial Park includes the following improvements: streets, utilities, community leisure needs, open space interpretive area, parking and maintenance facility. Other suggested uses for this park area include amphitheater complex, sports complex, conference center and numerous other active/passive recreational amenities. Project funding includes 1% for public art. PROJECT NEED: The Macario Canyon property has been under City lease or ownership for a number of years. The development of this property, since it is centrally located, would provide the needed parkland for all quadrants at buildout. Part of the Parks and Recreation Element of the General Plan. FINANCING: Purpose Estimated Cost Funding Source Design/Construction $23,239,800 CFD #1 Total Cost = $23,239,800 NORTHWEST QUADRANT PARK PROJECTS FUNDING MATRIX FOR NORTHWEST QUADRANT PARKS PROJECTS FUTURE YEAR BUDGET AMOUNTS PROJ FUND FUNDING TOTAL PRIOR YEAR 1 YEAR2 YEAR3 YEAR4 YEARS YEAR 6-10 BUILDOUT NO. NO. PROJECT TITLE SOURCE BUDGET APPROP. 2009-2010 2010-2011 2011-2012 2012-2013 2013-2014 2014-2019 2019-2024 PINE AVENUE PARK -PINE COMMUNITY BUILDING -PHASE II PIL-NW 1,751,776 0 1,751,776 PINE AVENUE PARK -PINE COMMUNITY BUILDING -PHASE II PFF 7,919,958 0 7,919,958 PINE AVENUE PARK -RESTROOM/STORAGE BUILDING PFF 276,656 0 276,656 PINE AVENUE PARK -RESTROOM/STORAGE BUILDING PIL-NW 100,000 0 100,000 Page 24 CAPITAL PROJECT DESCRIPTION NORTHWEST QUADRANT PARKS -PINE AVENUE PARK -PHASE II (COMMUNITY BUILDING) PROJECT NAME NONE PROJECT NO. PROJECT LOCATION MAP: PROJECT LOCATION: Pinepkll Pine Avenue Park. PROJECT DESCRIPTION: Construct a 20,000 square foot community facility/gymnasium. Facility will include basketball, volleyball, gymnastics, multi-purpose rooms, meeting rooms, teen center, and office space. PROJECT NEED: Identified in the Parks and Recreation Element of the General Plan, and meets Recreation Facility Guidelines for one community center per quadrant. FINANCING: Purpose Design/Construction Design/Construction Total Cost= Estimated Cost $1,751,776 $7,919,958 $9,671,734 Funding Source PIL-NW PFF Page 25 PINE_REST CAPI PR JECT ESCRIPTION NONE NORTHWEST QUADRANT PARKS ..... PINE AVENUE PARK PHASE 1-B RESTROOM I STORAGE BUILDING PROJECT NO. PROJECT NAME Construction of a combination restroom/storage building adjacent to the existing Pine Avenue Park multi-purpose field. The structure is proposed to be a pre-fabricated unit. The restroom has been requested by citizens using the park as they feel the temporary modular restroom is too far away from the multi-purpose field where the majority of the users are. The storage component would be integral to the proposed restroom and is needed to house the baseball outfield fencing and the temporary pitching mound. FINANCING: Design Construction Administration Total Cost= Estimated Cost $13,216 $330,400 $33,_040; $376,656~ Funding Source PIL-NW/PFF PIL-NW/PFF PIL-NW/PFF Page 26 NORTHEAST QUADRANT PARK PROJECTS FUNDING MATRIX FOR NORTHEAST QUADRANT PARKS PROJECTS FUTURE YEAR BUDGET AMOUNTS PROJ FUND FUNDING TOTAL PRIOR YEAR 1 YEAR2 YEAR3 YEAR4 YEAR5 YEAR 6-10 BUILDOUT NO. NO. PROJECT TITLE SOURCE BUDGET APPROP. 2009-2010 2010-2011 2011-2012 2012-2013 2013-2014 2014-2019 2019-2024 3801 38011 ROBERTSON RANCH PARK DEVELOPMENT (PARTIAL FUNDING) PIL-NE 1,800,000 0 1,800,000 Page 27 NEQUAD_3 Page 28 CAPITAL PROJECT DESCRIPTION 3801 NORTHEAST QUADRANT PARKS - PARK SITE DEVELOPMENT PROJECT NO. PROJECT NAME PROJECT LOCATION MAP: PROJECT LOCATION: Within northeast quadrant of the City, possible site identified in future Robertson Ranch development near the corner of Cannon Road and El Camino Real. PROJECT DESCRIPTION: Develop ± 15 acres for soccer fields with restrooms and parking. PROJECT NEED: Fifteen (15) acres will be developed to meet the City’s guidelines for numbers of sports fields per quadrant. FINANCING: Purpose Estimated Cost Funding Source Construction $1,800,000 PIL-NE Total Cost = $1,800,000 SOUTHWEST QUADRANT PARK PROJECTS FUNDING MATRIX FOR SOUTHWEST QUADRANT PARKS PROJECTS FUTURE YEAR BUDGET AMOUNTS PROJ FUND FUNDING TOTAL PRIOR YEAR 1 YEAR2 YEAR3 YEAR4 YEARS YEAR 6-10 BUILDOUT NO. NO. PROJECT TITLE SOURCE BUDGET APPROP. 2009-2010 2010-2011 2011-2012 2012-2013 2013-2014 2014-2019 2019-2024 3699 AVIARA COMMUNITY PARK COMMUNITY BUILDING PFF 7,937,488 0 7,937,488 AVIARA COMMUNITY PARK COMMUNITY BUILDING PIL-SW 2,806,648 0 2,806,648 3649 36491 AVIARA REIMBURSEMENT AGREEMENT PIL-SW 238,000 238,000 4502 45021 POINSETTIA COMMUNITY PARK -PHASE 111 PFF 14,620,640 1,089,200 1,076,400 12,455,040 4502 45021 POINSETTIA COMMUNITY PARK -PARKING PFF 963,400 963,400 Page 29 CAPITAL PROJECT DESCRIPTION NONE SOUTHWEST QUADRANT PARKS -AVIARA COMMUNITY PARK -PHASE 11 (COMMUNITY BUILDING) PROJECT NO. PROJECT LOCATION MAP: Zone1911 PROJECT NAME PROJECT LOCATION: In the southwest quadrant at the northern end of the Aviara community at the intersection of Poinsettia Lane and Ambrosia. PROJECT DESCRIPTION: Construction of a 18,000 square foot community facility that would include meeting and activity rooms and park offices. Project includes 1 % for Public Art. PROJECT NEED: Identified in the Parks and Recreation Element of the General Plan and meets the Recreation Facility Guidelines. FINANCING: Purpose Design/Construction Design/Construction Total Cost= Estimated Cost $2,806,648 $7,937,488 $10,744,136 Funding Source PIL-SW PFF Page 30 CAPITAL PROJECT DESCRIPTION SOUTHWEST QUADRANT PARKS -AVIARA REIMBURSEMENT AGREEMENT PROJECT NAME 3649 PROJECT NO. PROJECT LOCATION MAP: PROJECT LOCATION: Aviareim In the southwest quadrant, at the northern tip of Zone 19, north of Poinsettia Lane and west of El Camino Real. PROJECT DESCRIPTION: This is a reimbursement to the Aviara Land Associates Company made in accordance with the Aviara Master Plan parks agreement relating to the acquisition of property for the future Zone 19 park site. PROJECT NEED: The Zone 19 park is required to meet growth management for park land within the southwest quadrant. FINANCING: Purpose Reimbursement Total Cost= Estimated Cost $238,000 $238,000 Funding Source PIL-SW Page 31 CAPITAL PROJECT DESCRIPTION SOUTHWEST QUADRANT PARKS -POINSETTIA COMMUNITY PARK (PHASE Ill) PROJECT NAME 4502 PROJECT NO. PROJECT LOCATION MAP: PROJECT LOCATION: Poins_lll Poinsettia Community Park in the southwest quadrant east of Paseo del Norte between Palomar Airport Road and Poinsettia Lane. PROJECT DESCRIPTION: Phase 111 of this 42 acre park includes development of the remainder of the facilities identified in the Master Plan. Amenities will include a community facility/gymnasium, enclosed soccer field, tot lot, picnic areas, tennis complex, and additional parking. Includes 1 % for public art. PROJECT NEED: Identified in the Parks and Recreation Element of the General Plan. Also needed to meet the Recreation Facility Guidelines. FINANCING: Purpose Design/Construction Total Cost= Estimated Cost $14,620,640 $14,620,640 Funding Source PFF Page 32 CAPITAL PROJECT DESCRIPTION 4502 SOUTHWEST QUADRANT PARKS -POINSETTIA PARK PHASE II -PARKING EXPANSION PROJECT NO. PROJECT LOCATION MAP: J __ P--cc:A=LO=MA~R- POINPK_II PROJECT NAME PROJECT LOCATION: Within existing Poinsettia Community Park. PROJECT DESCRIPTION: Add two parking lots that are part of Phase II of the Poinsettia Park Master Plan. PROJECT NEED: Lack of adequate parking during peak use times has created a local parking concern with cars parking on the access road. This could potentially restrict ingress and egress of emergency vehicles. The additional parking will provide more spaces during peak times. The additional parking lots are part of the original Poinsettia Community Park Master Plan. FINANCING: Purpose Design Construction Total Cost= Estimated Cost $60,215 $903,185 $963,400 Funding Source PFF PFF Page 33 SOUTHEAST QUADRANT PARK PROJECTS FUNDING MATRIX FOR SOUTHEAST QUADRANT PARKS PROJECTS FUTURE YEAR BUDGET AMOUNTS PROJ FUND FUNDING TOTAL PRIOR YEAR1 YEAR2 YEAR3 YEAR4 YEAR5 YEAR 6-10 BUILDOUT NO. NO. PROJECT TITLE SOURCE BUDGET APPROP. 2009-2010 2010-2011 2011-2012 2012-2013 2013-2014 2014-2019 2019-2024 3837 38372 ALGANORTEPARK-PHASEl~OACRE~ PFF 22,107,510 22,107,510 3925 39251 ALGA NORTE PARK -PHASE II (POOL) PFF 6,099,695 6,099,695 3925 39252 ALGA NORTE PARK-PHASE II (POOL) GCC 6,000,000 6,000,000 3925 39252 ALGA NORTE PARK -PHASE II (POOL) PROP C FUNDS GCC 16,215,795 16,215,795 LEO CARRILLO PARK -PHASE Ill PFF 1,057,000 0 310,500 746,500 LEO CARRILLO PARK -PHASE Ill PIL-SE 866,100 0 866,100 3961 39611 LEO CARRILLO BARN PFF 500,000 0 500,000 3961 39611 LEO CARRILLO BARN STABILIZATION ($197K = GRANT) GCC 500,000 500,000 Page 34 PROJECT LOCATION MAP: PROJECT SITE ALGANOR2 CAPITAL PROJECT DESCRIPTION SOUTHEAST QUADRANT PARKS -ALGA NORTE PARK -PHASE I PROJECT NAME PROJECT LOCATION: 3837 PROJECT NO. In the Southeast Quadrant, east of El Camino Real and north of and adjacent to future Poinsettia Lane. PROJECT DESCRIPTION: The first phase of this project will include development of approximately 30 acres of the proposed total of 30 acres of park. Amenities include ballfields, basketball courts, picnic areas, restrooms, parking, skate park, dog park, tot lots, etc. Also included is 1 % for Public Art. PROJECT NEED: Required to meet Growth Management Standards and identified in the Parks and Recreation Element of the General Plan. FINANCING: Purpose Design Construction -Ad min/Inspection Total Cost= Estimated Cost $842,830 $20,483,705 $780,975 $22,107,510 Annual Operating Cost = $347,000 Funding Source PFF PFF PFF Page 35 CAPITAL PROJECT DESCRIPTION SOUTHEAST QUADRANT PARKS -ALGA NORTE PARK PHASE II {AQUATICS CENTER) PROJECT NAME 3925 PROJECT NO. PROJECT LOCATION MAP: PROJECT LOCATION: ALGANOR1 In the Southeast Quadrant, at the intersection of Poinsettia Lane and Alicante Road. PROJECT DESCRIPTION: The Aquatic Center includes a competitive 50 meter pool, a 12-lane instruction pool, a therapy pool, a 13,000 spare foot mechanical building, an administrative building, locker room facilities, group meeting facility, a fitness room, and a concessions kitchen. PROJECT NEED: Alga Norte Park is identified in the Parks and Recreation Element as the site of a future public swimming pool. The existing swim complex is currently past capacity. A new 50 meter pool will assure that adequate swimming facilities will be available for current and future residents. Also includes 1 % for Public Art. FINANCING: Purpose Design Construction Admin/FFE Total Cost= Estimated Cost $1,051,170 $26,290,295 $974,025 $28,315,490 Funding Source PFF/GCC PFF /GCC/Prop C PFF/GCC Page 36 PROJECT LOCATION MAP: LEOCRIII CAPITAL PROJECT DESCRIPTION NONE SOUTHEAST QUADRANT PARKS -LEO CARRILLO PARK -PHASE Ill PROJECT NAME PROJECT NO. ~l PROJECT PROJECT LOCATION: In the Southeast Quadrant, approximately one mile south of Palomar Airport Road adjacent to the future extension of Melrose Drive and future Poinsettia Lane. PROJECT DESCRIPTION: Development of historical ranch into a community park. Project includes completion of remainder of Master Plan (not completed in Phase II). Project includes renovation of additional buildings, construction of additional restrooms, arboretum area, additional landscaping, etc. PROJECT NEED: Required to meet Growth Management Standards and identified in the Parks and Recreation Element of the General Plan. FINANCING: Purpose Design/Construction Design/Construction Total Cost= Estimated Cost $1,057,000 $866,100 $1,923,100 Funding Source PFF PIL-SE Page 37 CAPITAL PROJECT DESCRIPTION SOUTHEAST QUADRANT PARKS -CARRILLO RANCH BARN & THEATER PROJECT NAME 3961 PROJECT NO. PROJECT LOCATION MAP: PROJECT LOCATION: ("") ("") ' ~~ 00 ">j ">j ("") UJ > > ::ti z I:""' 00 s:: l:;t:I > > :;ti i::::, ("") 0 UJ Carrillo Barn Within Carrillo Ranch Park. PROJECT DESCRIPTION: Construction of the "Barn/Theater" portion of future Phase Ill of Carrillo Ranch. Includes foundation, roof, and wall stabilization and miscellaneous other renovations. PROJECT NEED: The Carrillo Ranch Master Plan calls for the renovation and adoptive reuse of the barn into a theater for visitor orientation presentations, showing old Leo Carrillo films, and various educational purposes. The project will also provide revenue generating opportunities as it can be rented as a meeting facility. FINANCING: Purpose Estimated Cost Design/Construction $500,000 Design/Construction $500,000 Total Cost= $1,000,000 * $197,000 grant funds for Barn Stabilization Funding Source GCC* PFF Page 38 DRAINAGE PROJECTS DRAINAGE PROJECTS FUNDING MATRIX FOR DRAINAGE PROJECTS FUTURE YEAR BUDGET AMOUNTS PROJ FUND FUNDING TOTAL PRIOR YEAR 1 YEAR2 YEAR3 YEAR4 YEARS YEAR 6-10 BUILDOUT NO. NO. PROJECT TITLE SOURCE BUDGET APPROP. 2009-2010 2010-2011 2011-2012 2012-2013 2013-2014 2014-2019 2019-2024 AGUA HEDIONDA CHANNEL GCC 859,037 0 859,037 3338 33381 AGUA HEDIONDA CHANNEL (PLDA "B" -FACILITY B + BN) PLO 4,384,413 1,896,522 2,287,891 40,000 40,000 40,000 80,000 3919 39192 CARLSBAD BLVD/ENCINAS CREEK BRIDGE REPLACEMENT (PLDA C) PLO 2,539,565 1,593,900 945,665 CHESTNUT AVENUE AND VALLEY DRIVE (REIMB. -FACILITY BCC) PLO 511,979 511,979 6607 66071 CMP REPLACEMENT PROGRAM IRF 2,598,000 1,377,000 432,000 507,000 282,000 COLLEGE BLVD. BRIDGE (REIMB./PLDA "B" -FACILITY BL-L) PLO 1,816,101 0 1,816,101 3636 36363 COLLEGE BLVD/CANNON RD (PLDA B-FACILITY BJB + BNB + BJ1) PLO 2,889,757 2,889,757 FIRE STATIONS 1 THRU 5 DRAINAGE SYSTEMS GCC 225,000 0 225,000 6609 66091 HOSP GROVE PARK DRAINAGE IMPROVEMENTS IRF 150,000 150,000 6606 66061 KELLY DRIVE CHANNEL REPAIR IRF 1,223,500 476,000 685,000 17,500 15,000 12,500 17,500 6602 66021 LA COSTA AVE STORM DRAIN REPLACEMENT IRF 492,150 492,150 MARCA DRIVE DRAINAGE IMPROVEMENTS GAS TAX 65,000 0 65,000 MISCELLANEOUS MASTER DRAINAGE FACILITIES PLO 9,241,081 0 9,241,081 3681 36811 MISCELLANEOUS ROAD SUBDRAINS GAS TAX 560,000 560,000 6608 66081 NW QUADRANT STORM DRAIN IMPROVEMENT PROGRAM GCC 460,250 460,250 6608 66082 NW QUADRANT STORM DRAIN IMPROVEMENT PROGRAM GAS TAX 3,392,594 406,055 507,573 525,898 694,228 949,500 153,840 155,500 PARK DRIVE AND TAMARACK AVE STORM DRAIN (FACILITY BCA) PLO 1,068,613 0 1,068,613 PARK DRIVE DRAINAGE AND STREET IMPROVEMENTS GCC 155,500 0 155,500 RANCHO CARRILLO WATER SEEPAGE GCC 53,000 0 53,000 6603 66031 RIDGECREST DRAINAGE IMPROVEMENTS GCC 117,500 117,500 6604 66041 ROMERIA DRAINAGE IMPROVEMENTS GCC 299,000 274,000 5,000 5,000 5,000 5,000 5,000 6604 66042 ROMERIA DRAINAGE IMPROVEMENTS GAS TAX 338,000 338,000 TAMARACK AND ECR STORM DRAIN & SILT BASIN (BFB-L + BF1) PLO 904,329 0 904,329 Page 39 PROJECT LOCATION MAP: PROJECT SITE STORMDR1 EXISTING DRAINAGE CHANNEL CAPITAL PROJECT DESCRIPTION DRAINAGE PROJECTS -AGUA HEDIONDA CHANNEL IMPROVEMENTS PROJECT NAME PROJECT LOCATION: 3338 PROJECT NO. Along the Agua Hedionda Creek Channel from the downstream edge of the Cannon Road bridge to approximately 3,100 feet upstream of the El Camino Real bridge. PROJECT DESCRIPTION: The proposed work includes dredging approximately 40,000 cubic yards of accumulated sediment from within the Agua Hedionda channel, widening and improvement of the channel at the confluence of the Agua Hedionda and Calavera Creeks, reconstruction of the bridge piers under El Camino Real to streamline flows and reduce potential blockages, stabilization of the Calavera Creek channel and mitigation work for the impacts associated with the channel improvement project. Further studies will determine the scope of the mitigation work and the construction costs associated with mitigation and construction. PROJECT NEED: Required by the Drainage Master Plan to mitigate potential flooding impacts to the Rancho Carlsbad Mobile Home Park development. FINANCING: Purpose Environmental Design Construction Adm in/Inspection Mitigation/Monitoring Total Cost= Estimated Cost $400,000 $425,000 $3,313,082 $246,331 $859,037 $5,243,450 Funding Source PLDA "B" PLDA "B" PLDA "B" PLDA "B" GCC Page 40 PROJECT LOCATION MAP: ECbridge CAPITAL PROJECT DESCRIPTION DRAINAGE PROJECTS -CARLSBAD BOULEVARD ENCINAS CREEK BRIDGE REPLACEMENT PROJECT NAME PROJECT LOCATION: 3919 PROJECT NO. Southbound lanes of Carlsbad Boulevard south of Palomar Airport Road and , north of the South Carlsbad State Beach campgrounds. PROJECT DESCRIPTION: Complete replacement of the existing bridge structure for southbound lanes of Carlsbad Boulevard originally constructed in 1913. PROJECT NEED: Carlsbad Boulevard is a major north/south transportation roadway in north county. The bridge structure does not meet seismic standards and is close to exceeding its expected service life. Reinforcing steel is exposed and corroding and Caltrans has recommended that the bridge be replaced. FINANCING: Purpose Design & Environmental Construction Ad min/Inspection Total Cost= Estimated Cost $500,000 $1,869,565 $170,000 $2,539,565 Funding Source PLDA"C" PLDA"C" PLDA"C" Page 41 Chestnut/Valley Facility BCC Page 42 CAPITAL PROJECT DESCRIPTION DRAINAGE PROJECTS – CHESTNUT AVENUE AND VALLEY STREET (FACILITY BCC) PROJECT NO. PROJECT NAME PROJECT LOCATION MAP: PROJECT LOCATION: Along Chestnut Avenue between Valley Street and Highland Drive. PROJECT DESCRIPTION: Construct a 36” RCP storm drain with a proposed length of 925 lf, four drainage inlets and three manhole cleanouts. This facility is identified as Drainage Master Plan Facility “BCC” and is funded by the Planned Local Drainage Area (PLDA) B. PROJECT NEED: The purpose of the storm drain improvements is to reduce street flooding that occurs on portions of Chestnut Avenue during storm events. It also collects on-site run-off from surrounding areas, including Carlsbad High School. The Carlsbad Unified School District (CUSD) will construct the storm drain facility as part of the modernization project at the existing Carlsbad High School site. The city and the CUSD entered into a reimbursement agreement whereby the city will contribute 50% of the cost not to exceed $511,979 which is the estimated cost identified in the PLDA Fee Program. FINANCING: Purpose Estimated Cost Funding Source Design/Construction $511,979 PLDA B Total Cost = $511,979 PROJECT LOCATION MAP: CAPITAL PROJECT DESCRIPTION DRAINAGE PROJECTS -CMP REPLACEMENT PROGRAM PROJECT NAME PROJECT LOCATION: Various locations throughout the City. PROJECT DESCRIPTION: 6607 PROJECT NO. Replace CMP storm drain pipelines in need of replacement based on a review of television condition surveys. PROJECT NEED: Replace CMP storm drain pipelines with RCP or slip lining at various locations throughout the City to proactively eliminate pipeline failures. FINANCING: Estimated Cost VARIOUS LOCATIONS THROUGHOUT THE CITY Purpose Funding Source CMP_PROG Design Environmental Review Construction Total Cost= $240,000 $50,000 $2,308,000 $2,598,000 IRF IRF IRF Page 43 PROJECT LOCATION MAP: Collbrdg CAPITAL PROJECT DESCRIPTION DRAINAGE PROJECTS -COLLEGE BOULEVARD BRIDGE FACILITY PROJECT NAME PROJECT NO. LAKE CALAVERA ~ -' .• r -.~--::_.,., ) "' hoJECT '3~ SITE PROJECT LOCATION: At the College Boulevard crossing of the Agua Hedionda Creek. PROJECT DESCRIPTION: Construction of a bridge structure for the College Boulevard crossing of the Agua Hedionda Creek and extension of 90" CMP stormdrain in College Blvd. (Facility BL-L) PROJECT NEED: The project is needed to protect College Boulevard from flood damage. FINANCING: Purpose Design/Construction Total Cost= Estimated Cost $1,816,101 $1,816,101 Funding Source PLDA"B" Page 44 Basin_BJ Page 45 CAPITAL PROJECT DESCRIPTION 3636 DRAINAGE PROJECTS – COLLEGE BOULEVARD / CANNON ROAD (CALAVERA CREEK CHANNEL AND DRAINAGE BASIN BJ) PROJECT NO. PROJECT NAME PROJECT LOCATION MAP: PROJECT LOCATION: Along Calavera Creek from El Camino Real to future College Boulevard and within the Little Encinas Creek immediately east of the future College Boulevard. Drainage Master Plan ID: BJB, BNB, and BJ-1) PROJECT DESCRIPTION: Construction of a 49 acre-foot drainage retention basin covering approximately 8 acres of land within and adjacent to the Little Encinas Creek located east of the future College Boulevard at the northeast corner of the Rancho Carlsbad Mobile Home Park (RCMHP). Included with the project is a reinforced concrete box culvert under future College Boulevard. Also included is an 84 inch storm drain pipe proposed along the north side of Cannon Road, designed to take overflow drainage from the Calavera Creek. The construction of the retention basin may require the relocation of an existing RV storage lot, community garden and maintenance yard owned by the RCMHP property owners association. PROJECT NEED: This project is one in a series of projects designed to help reduce flooding along the Agua Hedionda and Calavera Creeks primarily within the RCMHP community. The project also eliminates flooding of El Camino Real during a 100-year flood event. The series of projects include the construction of four floodwater retention basins, including Basin BJ, Basin BJB, the Melrose Drive Basin and the Faraday Avenue basin, and the dredging and/or improvement of the Agua Hedionda and Calavera Creek channels. FINANCING: Purpose Estimated Cost Funding Source Total Cost $2,889,757 PLDA "B" Total Cost = $2,889,757 R J FIRE1-5 RIPTION NONE PROJECT NO. Under the City's NPDES Permit, fire apparatus washing runoff is prohibited from entering the City's storm drain system. In an effort to comply with this requirement, Fire Stations 1 through 5 will be retrofit with the construction of permanent Best Management Practices (BMP's) to treat the wash water and control the runoff before entering the storm drain system. Fire Station 6 is the only facility to have a permanent runoff collection and treatment system. Fire Stations 1 through 5 currently use a vacuum system which collects the wash water. The vacuum system is viewed as a temporary solution to comply with the permit until a permanent BMP solution is installed. FINANCING: Purpose Design Construction Administration Total Cost= $25,000 $145,000 $55,000 $225,000 GCC GCC GCC Page 46 PROJECT LOCATION MAP: HOSP CAPITAL PROJECT DESCRIPTION DRAINAGE PROJECTS -HOSP GROVE PARK DRAINAGE IMPROVEMENTS PROJECT NAME PROJECT LOCATION: Hosp Grove Park PROJECT DESCRIPTION: NONE PROJECT NO. Replace the existing deteriorated storm drain maintenance access roadway and provide localized erosion control methods. PROJECT NEED: The maintenance access roadway provides access to recently constructed storm drain facilities from Highland Avenue and also serves as the drainage course for the storm drain flow. The project proposes the replacement of the existing AC access roadway with a durable concrete access/drainage roadway. The project also includes the installation of large rocks in spot locations to reduce downstream erosion caused by the drainage flows. FINANCING: Purpose Design Construction Total Cost= Estimated Cost $20,000 $130,000 $150,000 Funding Source IRF IRF Page 47 PROJECT LOCATION MAP: KELLY_DR CAPITAL PROJECT DESCRIPTION DRAINAGE PROJECTS -KELLY DRIVE CHANNEL REPAIR PROJECT NAME PROJECT LOCATION: 6606 PROJECT NO. Parallel to Kelly Drive east of Hillside Drive and behind the row of homes on the south side of Kelly Drive. PROJECT DESCRIPTION: Reconstruct 260' of a concrete lined trapezoidal channel and 780' of concrete slope protection. PROJECT NEED: This portion of the existing concrete channel lining is breaking apart and the underlying earth is being eroded. The erosion is undermining the remaining channel and adjacent property/backyards. · FINANCING: Purpose Study/Design Environmental Construction Adm in/Inspection Total Cost= Estimated Cost $168,700 $361,800 $573,000 $120,000 $1,223,500 Funding Source IRF IRF IRF IRF Page 48 LaCostaSD Page 49 CAPITAL PROJECT DESCRIPTION 6602 DRAINAGE PROJECTS – LA COSTA AVENUE STORM DRAIN REPLACEMENTS PROJECT NO. PROJECT NAME PROJECT LOCATION MAP: PROJECT LOCATION: Various locations on La Costa Avenue east of El Camino Real. PROJECT DESCRIPTION: Replace old corrugated metal storm drains with reinforced concrete pipe at various locations along La Costa Avenue east of El Camino Real. PROJECT NEED: Existing corrugated metal storm drains are in very poor condition and need to be replaced in order to maintain adequate drainage. FINANCING: Purpose Estimated Cost Funding Source Design $50,000 IRF Construction $378,000 IRF Admin/Inspection $64,150 IRF Total Cost = $492,150 MARCADRAIN Page 50 CAPITAL PROJECT DESCRIPTION NONE DRAINAGE PROJECTS – MARCA PLACE DRAINAGE IMPROVEMENTS PROJECT NO. PROJECT NAME PROJECT LOCATION MAP: PROJECT LOCATION: Marca Place PROJECT DESCRIPTION: Subsurface conditions require an investigation of geotechnical conditions under Marca Place and an engineering analysis to determine the appropriate remediation measures for the road surface. After the analysis and design of the recommended remediation measures, funds for construction will be requested. PROJECT NEED: Residents have repeatedly contacted the Construction Management Division and Streets Maintenance Division requesting maintenance of the street. Marca Place has been repaired multiple times. FINANCING: Purpose Estimated Cost Funding Source Study $15,500 Gas Tax Design $35,500 Gas Tax Property Acquisition $2,000 Gas Tax Administration $12,000 Gas Tax Total Cost = $65,000 MASTRDRN.docx Page 51 CAPITAL PROJECT DESCRIPTION NONE DRAINAGE PROJECTS - MISCELLANEOUS MASTER DRAINAGE FACILITIES PROJECT NO. PROJECT NAME PROJECT LOCATION MAP: VARIOUS LOCATIONS THROUGHOUT THE CITY PROJECT LOCATION: Various locations throughout the City. PROJECT DESCRIPTION: Construction of various major storm drain facilities within the City. The facilities funded through this program are outlined in the Master Drainage and Storm Water Management Plan. PROJECT NEED: Required to meet Growth Management Standards and identified in the Master Drainage and Storm Water Quality Management Plan. FINANCING: Purpose Estimated Cost Funding Source Design/Construction $9,241,081 PLD Fees Total Cost = $9,241,081 Misc_drn Page 52 CAPITAL PROJECT DESCRIPTION 3681 DRAINAGE PROJECTS - MISCELLANEOUS ROAD SUBDRAINS PROJECT NO. PROJECT NAME PROJECT LOCATION MAP: PROJECT LOCATION: Nine locations throughout Carlsbad: 1. Carlina & Hataca Road 6. Quebrada Circle 2. Calavo Court 7. Linda Lane 3. Park Drive & Cove 8. Avenida Nieve 4. Alicante & Corte De La Vista 9. Circulo Adorno 5. La Costa Avenue & Cadencia 10. Calle Gavanzo (east side) PROJECT DESCRIPTION: Preparation of an engineering study report investigating the potential causes and remedies for various surface/subsurface drainage problems occurring at the various street locations listed above. Repairs will be made to the extent funding is available. Additional funding requests will be made after more detailed cost estimates are prepared in the study report. PROJECT NEED: Based upon citizen request and maintenance staff requests. 1. Save maintenance dollars 2. Mitigates hazards from slip and falls 3. Relieve health hazards FINANCING: Purpose Estimated Cost Funding Source Design/Construction $560,000 Gas Tax Total Cost = $560,000 NWSD_IMP Page 53 CAPITAL PROJECT DESCRIPTION 6608 DRAINAGE PROJECTS – NW QUADRANT STORM DRAIN IMPROVEMENT PROGRAM PROJECT NO. PROJECT NAME PROJECT LOCATION MAP: VARIOUS LOCATIONS IN NW QUADRANT OF THE CITY PROJECT LOCATION: Various locations in the NW Quadrant of the City. PROJECT DESCRIPTION: Construct missing sections of the NW Quadrant storm drain system. PROJECT NEED: In the infill portion of the City, older roadways were constructed without the proper storm drain improvements. The project would construct missing storm drain pipelines so the runoff is collected and transported through a complete underground drainage system. FINANCING: Purpose Estimated Cost Funding Source Environmental $25,600 Gas Tax Design $696,790 Gas Tax Construction $2,807,141 Gas Tax/GCC Admin/Inspection $328,313 Gas Tax Total Cost = $3,852,849 Park_tam Page 54 CAPITAL PROJECT DESCRIPTION NONE DRAINAGE PROJECTS - PARK DRIVE AND TAMARACK AVENUE STORM DRAIN PROJECT NO. PROJECT NAME PROJECT LOCATION MAP: CHESTNUT AVE. TAM A R A C K AVE.ELCAMINOREALMONROEST.SUNNYHILLDR.PARKDR.SKYLINERD.SIERRAMORENAAVE.VALLEYST.PROJECT N JAMES DR. PROJECT LOCATION: Along Park Drive from Monroe Street to Tamarack Avenue and along Tamarack Avenue from Park Drive to James Drive. PROJECT DESCRIPTION: Installation of approximately 2,100 linear feet of 24-inch diameter reinforced concrete storm drain pipe including access holes and other appurtenances. Identified within the Master Drainage Plan as facility "BCA". PROJECT NEED: Required to prevent flooding of properties west of Park Drive and north of Tamarack Avenue. The development of a proposed new subdivision east of Park Drive between Tamarack Avenue and Monroe Street will add the existing drainage and create a greater need for this master planned drainage facility. FINANCING: Purpose Estimated Cost Funding Source Planning/Study $100,000 PLDA "B" Construction $968,613 PLDA “B” Total Cost = $1,068,613 PARKDR Page 55 CAPITAL PROJECT DESCRIPTION NONE DRAINAGE PROJECTS – PARK DRIVE DRAINAGE AND STREET IMPROVEMENTS PROJECT NO. PROJECT NAME PROJECT LOCATION MAP: PROJECT LOCATION: Park Drive between Bayshore Drive and the residential driveway at 4650 Park Drive. PROJECT DESCRIPTION: This phase of the project includes the preparation of a Preliminary Design Study. The Preliminary Design Study will include geotechnical investigations and analysis, biological report, preliminary hydrology and hydraulic analysis, and slope and existing utility analysis. Alternatives will be developed to mitigate the drainage and erosion issue. The results of the Preliminary Design Analysis will determine the appropriate improvements to construct. PROJECT NEED: The slope easterly of Park Drive has a history of erosion and drainage issues. Several attempts to prevent the erosion and control the drainage have proven successful for a limited time. The groundwater is seeping through the cracks in the retaining wall causing extensive corrosion to the retaining wall. Complaints have been received regarding the erosion, sedimentation, algae and safety issues. FINANCING: Purpose Estimated Cost Funding Source Study $55,500 GCC Environmental $45,500 GCC Design $35,500 GCC Property Acquisition $2,000 GCC Administration $17,000 GCC Total Cost = $155,500 RANCHOCAR_SEEPAGE Page 56 CAPITAL PROJECT DESCRIPTION NONE DRAINAGE PROJECTS – RANCHO CARRILLO WATER SEEPAGE PROJECT NO. PROJECT NAME PROJECT LOCATION MAP: PROJECT LOCATION: Adjacent to the south abutment of the pedestrian bridge near Rancho Carrillo. PROJECT DESCRIPTION: Water is seeping through the south abutment of the pedestrian bridge and through the earth slope around the bridge abutment. A sub-drain system needs to be installed to convey water away from the bridge abutment and adjacent sewer manhole at the south end of the bridge. PROJECT NEED: The project is needed to prevent erosion around the bridge abutment which would undermine the structural support of the bridge. The sub-drain is also needed to convey water away from the sewer manhole at the end of the bridge to prevent water intrusion into the manhole. FINANCING: Purpose Estimated Cost Funding Source Design $8,000 GCC Construction $40,000 GCC Admin/Inspection $5,000 GCC Total Cost = $53,000 PROJECT LOCATION MAP: ~ ,, RIDGCRST CAPITAL PROJECT DESCRIPTION DRAINAGE PROJECTS -RIDGECREST DRAINAGE IMPROVEMENT PROJECT NAME PROJECT LOCATION: 3500 block of Ridgecrest Drive. PROJECT DESCRIPTION: Replace the existing corroded CMP pipe. PROJECT NEED: 6603 PROJECT NO. The existing inlet at the low point in this road clogs during storm events. The project would replace a CMP in the slope between Ridgecrest Drive and Celinda Drive. FINANCING: Purpose Estimated Cost Funding Source Study/Design $21,000 GCC Construction $80,500 GCC Adm in/Inspection $16,000 GCC Total Cost= $117,500 Page 57 ROMERIA Page 58 CAPITAL PROJECT DESCRIPTION 6604 DRAINAGE PROJECTS – ROMERIA STREET DRAINAGE IMPROVEMENT PROJECT NO. PROJECT NAME PROJECT LOCATION MAP: PROJECT LOCATION: Behind properties on Romeria Street. PROJECT DESCRIPTION: Replace approximately 400 linear feet of existing trapezoidal channel and 200 linear feet of tributary ditches. H&H study is recommended to verify channel size and adequacy of culvert under La Costa Avenue. PROJECT NEED: The existing channel is badly damaged with various sinkholes which poses a safety problem. FINANCING: Purpose Estimated Cost Funding Source Study $12,200 GCC Design $70,400 GCC Environmental $151,000 GCC Construction $22,000 GCC Construction $338,000 Gas Tax Admin/Inspection $42,900 GCC Total Cost = $637,000 PROJECT LOCATION MAP: TAMECRSD CAPITAL PROJECT DESCRIPTION DRAINAGE PROJECTS -TAMARACK AND EL CAMINO REAL STORM DRAIN AND SILTATION BASIN PROJECT NAME PROJECT LOCATION: NONE PROJECT NO. At the southeast corner of Tamarack Avenue and El Camino Real. PROJECT DESCRIPTION: Reimbursement for the construction of a 45-inch and 75-inch storm drainage system together with appurtenant inlets, access holes and outlet structures. Project also includes the installation of an approximate 32,000 cubic yard siltation basin. The project facilities are identified as facilities "BF", "BFB" and Basin "BF1". PROJECT NEED: The Robertson Ranch property owners are currently processing a master plan for development of the Robertson Ranch project including the property at the southeast corner of Tamarack Avenue and El Camino Real. As a condition of development, the developer will be required to install the above-described Master Drainage Plan facilities. The cost of the facilities is expected to exceed the drainage fee obligation for the project, thus creating the potential need for reimbursement. FINANCING: Purpose Reimbursement Total Cost= Estimated Cost $904,329 $904,329 Funding Source PLDA "B" Fees Page 59 SEWER PROJECTS ENC/NA WATER POLLUTION CONTROL FACILITY PROJECTS FUNDING MATRIX FOR ENCINA WATER POLLUTION CONTROL FACILITY PROJECTS FUTURE YEAR BUDGET AMOUNTS PROJ FUND FUNDING TOTAL PRIOR YEAR 1 YEAR2 YEAR3 YEAR4 YEARS YEAR 6-10 BUILDOUT NO. NO. PROJECT TITLE SOURCE BUDGET APPROP. 2009-2010 2010-2011 2011-2012 2012-2013 2013-2014 2014-2019 2019-2024 5800 58001 BUILDING IMPROVEMENTS SEWERREPL 4,593,155 4,593,155 5801 58011 CAPITAL ACQ/REPUREHAB AND STAFFING SEWERREPL 35,950,927 2,482,372 1,575,887 1,656,203 1,588,467 1,542,189 1,425,073 6,190,056 19,490,680 PHASE IV EXPANSION -DEBT SERVICE SEWER CONN 6,522,144 937,170 933,007 931,419 932,469 931,469 928,419 928,191 5803 58031 PHASE V EXPANSION SEWER CONN 10,603,878 10,603,878 Page 60 CAPITAL PROJECT DESCRIPTION ENCINA WATER POLLUTION CONTROL FACILITY -BUILDING IMPROVEMENTS PROJECT NAME 5800 PROJECT NO. PROJECT LOCATION MAP: PROJECT LOCATION: ENCINA-1 Encina Water Pollution Control Facility at 6200 Avenida Encinas. PROJECT DESCRIPTION: To construct and/or improve existing building facilities at the Encina Water Pollution Control Facility. Cost represents City's pro-rated share of the building improvements. Building improvements include: • Additional Office • Employee Locker Facilities • Expanded Laboratory Facilities PROJECT NEED: Needed to provide office and laboratory facilities at the Encina Water Pollution Control Facility. FINANCING: Purpose Estimated Cost Funding Source Design/Construction $4,593,155 Sewer Replacement Total Cost= $4,593,155 Page 61 CAPITAL PROJECT DESCRIPTION ENCINA WATER POLLUTION CONTROL FACILITY -CAPITAL ACQUISITIONS REPLACEMENT/REHABILITATION PROJECT NAME 5801 PROJECT NO. PROJECT LOCATION MAP: PROJECT LOCATION: ENCINA-2 Encina Water Pollution Control Facility at 6200 Avenida Encinas. PROJECT DESCRIPTION: The funds for this project are used by the Encina Water Pollution Control Facility to develop and construct its buildout Capital Improvement Program. The cost is Carlsbad's share to cover staff, overhead, and hiring consultants to design and develop bid specifications for future capital acquisitions and the replacement I rehabilitation I construction of facilities at the sewer treatment plant. PROJECT NEED: To ensure the efficient and effective operation of Encina Water Pollution Control Facility. FINANCING: Purpose Estimated Cost Funding Source Design/Construction $35,950,927 Sewer Replacement Total Cost= $35,950,927 Page 62 CAPITAL PROJECT DESCRIPTION ENCINA WATER POLLUTION CONTROL FACILITY -PHASE IV EXPANSION DEBT SERVICE PROJECT NAME NONE PROJECT NO. PROJECT LOCATION MAP: PROJECT LOCATION: TREATPLT South of Palomar Airport Road on the east side of Avenida Encinas. PROJECT DESCRIPTION: Expansion of the Encina Water Pollution Control Facility to increase treatment capacity from 22.5 million gallons per day to 36.0 million gallons per day of raw sewage. Cost includes bond financing and interest costs. PROJECT NEED: Required to meet Growth Management Standards and identified in the Master Plan of Sewage. FINANCING: Purpose Estimated Cost Funding Source Debt Service $6,522,144 Sewer Connection Total Cost= $6,522,144 Page 63 PROJECT LOCATION MAP: EWPCF-V CAPITAL PROJECT DESCRIPTION 5803 ENCINA WATER POLLUTION CONTROL FACILITY -PHASE V EXPANSION PROJECT NAME PROJECT NO. PROJECT LOCATION: Encina Water Pollution Control Facility at 6200 Avenida Encinas. PROJECT DESCRIPTION: Expand the Encina Water Pollution Control Facility to buildout for the treatment of 45-60 MGD of wastewater. Cost represents City's pro-rated share of the Phase V expansion. PROJECT NEED: To provide for ultimate wastewater treatment capacity of the Carlsbad Sewer District. FINANCING: Purpose Estimated Cost Funding Source Design/Construction $10,603,878 Sewer Connection Total Cost= $10,603,878 Page 64 SEWER COLLECTION SYSTEM PROJECTS FUNDING MATRIX FOR SEWER COLLECTION SYSTEM PROJECTS FUTURE YEAR BUDGET AMOUNTS PROJ FUND FUNDING TOTAL PRIOR YEAR 1 YEAR2 YEAR3 YEAR4 YEARS YEAR 6-10 BUILDOUT NO. NO. PROJECT TITLE SOURCE BUDGET APPROP. 2009-2010 2010-2011 2011-2012 2012-2013 2013-2014 2014-2019 2019-2024 AVENIDA ENCINAS GRAVITY SEWER SEWERREPL 276,300 0 276,300 5512 55121 BEECH STREET SEWER REPLACEMENT SEWERREPL 1,947,000 1,947,000 5501 55011 BUENA INTERCEPTOR SEWER IMPROVEMENTS SEWERREPL 2,840,000 1,460,000 1,380,000 5507 55071 CALAVERA HILLS TREATMENT PLANT-DEMOLITION SEWERREPL 854,000 23,500 830,500 CARLSBAD TRUNK SEWER REACHES VCT1A, VCT1 B, VCT1 C SEWBENEF 120,600 0 120,600 CARLSBAD TRUNK SEWER REACHES VCT1A, VCT1 B, VCT1 C SEWERREPL 427,635 0 427,635 5513 55131 CONDITION ASSESSMENT OF SEWER MAINS SEWERREPL 626,000 313,000 313,000 3873 38731 HOME PLANT -PIPELINE REPLACEMENT SEWERREPL 919,000 534,000 385,000 5509 55091 HOME PLANT LIFT STATION REPLACEMENT SEWERREPL 2,712,000 1,812,000 100,000 800,000 3951 39511 LA COST A MEADOWS SEWER EXTENSION SEWERREPL 1,146,877 1,146,877 5500 55001 LA GOLONDRINA SEWER EXTENSION SEWERREPL 1,108,543 1,108,543 5510 55101 NORTH AGUA HEDIONDA TRUNK SEWER REACH NAHT1A (SBA "B") SEWERREPL 2,862,000 767,000 2,095,000 3538 35381 NORTH BATIQUITOS INTERCEPTOR REHABILITATION SEWERREPL 1,199,000 1,199,000 3875 38751 POINSETTIA SEWAGE LIFT STATION ODOR/NOISE ABATEMENT SEWERREPL 669,500 669,500 5505 55051 SEWER LIFT STATION REMOVALS-VARIOUS SEWERREPL 5,531,000 89,000 5,442,000 3840 38401 SEWER LIFT STATION REPAIRS AND UPGRADES SEWERREPL 1,360,380 660,380 100,000 100,000 100,000 100,000 300,000 3927 39271 SEWER LINE REFURBISHMENTS/REPLACEMENT AND MANHOLES SEWERREPL 5,974,600 2,730,000 330,000 330,000 330,000 330,000 1,650,000 274,600 5511 55111 SEWER MASTER PLAN/CONNECTION FEE UPDATE SEWERREPL 400,000 400,000 5511 55112 SEWER MASTER PLAN/CONNECTION FEE UPDATE SEWER CONN 100,000 100,000 5504 55041 SEWER MONITORING PROGRAM SEWER CONN 352,000 88,000 22,000 22,000 22,000 22,000 110,000 66,000 5502 55021 TERRAMAR LIFT STATION REPLACEMENT SEWERREPL 548,000 25,000 523,000 3492 55082 VISTA/CARLSBAD INTERCEPTOR AGUA HEDIONDA LIFT STATION (VC12) SEWER CONN 17,400,000 3,219,360 14,180,640 5508 34921 VISTA/CARLSBAD INTERCEPTOR BUENA VISTA FORCE MAIN (VC-4) SEWER CONN 6,225,000 3,350,000 2,875,000 3886 38861 VISTA/CARLSBAD INTERCEPTOR REACH VC11 B SEWER CONN 6,430,000 4,165,000 2,265,000 3949 39491 VISTA/CARLSBAD INTERCEPTOR REACH VC13 TO VC15 SEWER CONN· 14,700,000 2,600,000 12,100,000 3950 39501 VISTA/CARLSBAD INTERCEPTOR REPLACEMENT REACH 3 SEWER CONN 2,688,220 0 596,220 2,092,000 Page 65 PROJECT LOCATION MAP: PACIFIC OCEAN PROJECT AREA Avencsew CAPITAL PROJECT DESCRIPTION SEWER COLLECTION SYSTEM -AVENIDA ENCINAS GRAVITY SEWER PROJECT NAME PROJECT LOCATION: Along north side of Lanakai Mobile Home Park. PROJECT DESCRIPTION: 3581 PROJECT NO. Replace approximately 1,000 feet of 8" gravity sewer. PROJECT NEED: The existing forcemain releases unacceptable levels of hydroden sulfide gas resulting in numerous odor complaints and deterioration of the gravity sewer system. FINANCING: Purpose Oesign/Admin/lnsp Construction Total Cost= Estimated Cost $61,250 $215,050 $276,300 Funding Source Sewer Replacement Sewer Replacement Page 66 BEECH Page 67 CAPITAL PROJECT DESCRIPTION 5512 SEWER COLLECTION SYSTEM – BEECH AVENUE SEWER REPLACEMENT PROJECT NO. PROJECT NAME PROJECT LOCATION MAP: PROJECT LOCATION: Sewer main on Beech Avenue from Ocean Street to Washington Street. PROJECT DESCRIPTION: The project would include the removal of the existing sewer pipeline, installing a new sewer line by means of pipe jacking, and installing a new collector sewer for the sewer laterals. PROJECT NEED: The existing 30 year old 8" sewer pipe in Beech Avenue collects sewage from the businesses and residents along Ocean Street, Christiansen Way, Grand Avenue, Carlsbad Village Drive, Oak Avenue, and Pine Avenue. Based on video surveillance, the sewer line is significantly deteriorated and requires frequent maintenance. The project is needed to prevent sudden failure and to restore the sewer pipeline to convey tributary wastewater flow. FINANCING: Purpose Estimated Cost Funding Source Design $45,000 Sewer Replacement Construction $1,902,000 Sewer Replacement Total Cost = $1,947,000 CAPITAL PROJECT DESCRIPTION SEWER COLLECTION SYSTEM -BUENA INTERCEPTOR SEWER IMPROVEMENTS PROJECT NAME 5501 PROJECT NO. PROJECT LOCATION MAP: PROJECT LOCATION: BUENA_INT PROJECT (Bl)Elt~ INTERCEPTOR) Buena Interceptor Sewer from El Camino Real to the Encina Wastewater Treatment Plant. PROJECT DESCRIPTION: The Buena Interceptor Sewer conveys wastewater for the cities of Carlsbad and Vista. Implement the recommendations of the study completed in 2006 to address capacity issues, rehabilitate pipelines and manholes, and realign portion of the sewer out of the wetland areas. PROJECT NEED: Required to meet future sewer drainage basin flows. Also required pursuant to the Carlsbad/Buena Sanitation Agreement. FINANCING: Purpose Studies Design Environmental Construction Admin/lnspection Total Cost= Estimated Cost Funding Source $100,000 $414,000 $180,000 $1,870,000 $276,000 $2,840,000 Sewer Replacement Sewer Replacement Sewer Replacement Sewer Replacement Sewer Replacement Page 68 CAPITAL PROJECT DESCRIPTION SEWER COLLECTION SYSTEM -DEMOLITION OF CALAVERA HILLS TREATMENT PLANT PROJECT NAME 5507 PROJECT NO. PROJECT LOCATION MAP: PROJECT LOCATION: DEMCALHIL Northwest of Tamarack Avenue between Pontiac Drive and Carlsbad Village Drive. PROJECT DESCRIPTION: Study and propose a demolition plan for the existing Calavera Hills Sewer Treatment Plant. PROJECT NEED: The existing Calavera Hills Sewer Treatment Plant is now obsolete due to the full upgrade of the Encina Wastewater Treatment Facility. The project is needed because the facility has been abandoned, buildings and tanks are in disrepair, and the site is considered an attractive nuisance. FINANCING: Purpose Study Design Environmental Review Construction Total Cost= Estimated Cost $23,500 $185,500 $21,000 $624,000 $854,000 Funding Source Sewer Replacement Sewer Replacement Sewer Replacement Sewer Replacement Page 69 CAPITAL PROJECT DESCRIPTION SEWER COLLECTION SYSTEM -CARLSBAD TRUNK SEWER REACHES VCT1A, VCT1B, VCT1C PROJECT NAME NONE PROJECT NO. PROJECT LOCATION MAP: PROJECT LOCATION: VCT1ABC From Vancouver Street and Simsbury Court within Calavera Hills north to the Vista Carlsbad Trunkline located adjacent to Highway 78. PROJECT DESCRIPTION: i~ ; ~ Construct 1,000 feet of 8-inch diameter sewer, 2,000 feet of 10-inch diameter 0 r sewer, and 3,000 feet of 12-inch diameter sewer. PROJECT NEED: As Calavera Hills developed, several temporary sewage lift stations were constructed due to a lack of existing facilities downstream of the project sites. At the time, it was anticipated that the downstream properties would develop in a timely fashion negating any need for long-term maintenance of the temporary lift stations. The two listed stations are aging and in need of increased repair and maintenance. In lieu of expending the additional funds to upgrade temporary stations, staff is proposing completing the extension of the gravity lines from the stations to the existing Vista Carlsbad Trunk Line sewer. The lift stations would then be abandoned and removed. FINANCING: Purpose Land Acquisition Design Construction Total Cost= Estimated Cost $40,600 $80,000 $427,635 $548,235 Funding Source Sewer Benefit Zone Fee Sewer Benefit Zone Fee Sewer Replacement Page 70 CAPITAL PROJECT DESCRIPTION SEWER COLLECTION SYSTEM -SEWER FORCE MAIN I SIPHON CONDITION ASSESSMENT PROJECT NAME 5513 PROJECT NO. PROJECT LOCATION MAP: PROJECT LOCATION: VARIOUS LOCATIONS CITYWIDE SIPHON Each of the 14 force mains and siphons within the sewer system. PROJECT DESCRIPTION: The project consists of inspection and performing a condition assessment report to determine condition of the City's sewer force mains and siphons. PROJECT NEED: Per the WDR mandate, condition assessments of the sewer system force mains and siphons are required on a regular basis. Based on the inspection and ranking of needed improvements, staff will be able to better prioritize future CIP projects. FINANCING: Purpose Estimated Cost Funding Source Study/Design $626,000 Sewer Replacement Total Cost= $626,000 Page 71 CAPITAL PROJECT DESCRIPTION 3873 & 5509 SEWER COLLECTION SYSTEM -HOME PLANT PIPELINE AND LIFT STATION REPLACEMENT PROJECT NO. PROJECT NAME .-------------------------------------------------..... ----------------------------------------------------~ PROJECT LOCATION MAP: PACIFIC OCEAN Homeplnt I / •BUENA I VISTA ' LAGOON PROJECT LOCATION: Home Plant Lift Station near Carlsbad Boulevard and northern City limits. PROJECT DESCRIPTION: Replace pumps, upgrade wetwell and manifold p1prng, relocate wetwell ventilation system, reconstruct influent sewer manhole, and replace 260 feet of 15-inch gravity sewer pipeline. PROJECT NEED: Field review shows that sand accumulating in the wet well is due to undersized pumps. Installing larger pumps, replacing existing pipeline, and completing the other upgrades will reduce the maintenance costs at the pump station. FINANCING: Purpose Lift Station Design Environmental Construction Admin/1 nspection Pipeline Replacement Design Construction Admin/1 nspection Total Cost= Estimated Cost $119,000 $119,000 $2,331,000 $143,000 $72,000 $823,000 $24,000 $3,631,000 Funding Source Sewer Replacement Sewer Replacement Page 72 CAPITAL PROJECT DESCRIPTION SEWER COLLECTION SYSTEM -LA COSTA MEADOWS SEWER EXTENSION PROJECT NAME 3951 PROJECT NO. PROJECT LOCATION MAP: PROJECT LOCATION: RD. Lcmeadow In La Costa from the end of Chorlito Street to El Fuerte Street. PROJECT DESCRIPTION: Removal of the La Costa Meadows Lift Station and extension of an eight-inch gravity sewer approximately 600 feet to the new gravity sewer constructed in El Fuerte Street by the Rancho Carrillo project developer. PROJECT NEED: The La Costa Meadows Lift Station was constructed to temporarily divert sewage flows into existing Leucadia County Water District (LCWD) facilities. The diversion was required due to a lack of City sewer facilities located downstream of the La Costa Meadows project within the Rancho Carrillo Valley. The "diversion" agreement between the City and LCWD required the abandonment of the lift station and connection to City sewer facilities when the downstream properties were developed and new sewer facilities extended up El Fuerte Street. The needed downstream sewer collection facilities were recently constructed as part of the Rancho Carrillo project. FINANCING: Purpose Acquisition Design Environmental Construction Adm in/Inspection Total Cost= Estimated Cost $10,000 $33,000 $83,000 $930,557 $90,320 $1,146,877 Funding Source Sewer Replacement Sewer Replacement Sewer Replacement Sewer Replacement Sewer Replacement Page 73 PROJECT LOCATION MAP: La_golon POINSETTIA LIFT STATION LA GOLONDRINA LIFT STATION CAPITAL PROJECT DESCRIPTION 5500 SEWER COLLECTION SYSTEM -LA GOLONDRINA SEWER EXTENSION PROJECT NAME PROJECT NO. EXISTING TRUNK SEWER -~ PROJECT LOCATION: In La Costa from the end of La Golondrina Street north of Poinsettia Lane. PROJECT DESCRIPTION: Removal of the La Golondrina Lift Station and extension of an eight-inch diameter gravity sewer approximately 1,000 feet to the new gravity sewer constructed in Poinsettia Lane by the Rancho Carrillo project developer. PROJECT NEED: The La Costa Golondrina Lift Station was constructed to temporarily divert sewage flows into existing Leucadia County Water District (LCWD) facilities. The diversion was required due to a lack of City sewer facilities located downstream of the Ponderosa Homes project within the Rancho Carrillo Valley. The "diversion" agreement between City and LCWD require the abandonment of the lift station and connection to City sewer facilities when the downstream properties were developed and new sewer facilities extended up the future Poinsettia Lane. The needed downstream sewer collection facilities were recently completed as part of the Rancho Carrillo project. FINANCING: Purpose Planning/Study Land Acquisition Environmental Design Construction Adm in/Inspection Total Cost= Estimated Cost $10,000 $20,000 $31,610 $98,000 $849,498 $99,435 $1,108,543 Funding Source Sewer Replacement Sewer Replacement Sewer Replacement Sewer Replacement Sewer Replacement Sewer Replacement Page 74 CAPITAL PROJECT DESCRIPTION SEWER COLLECTION SYSTEM -NORTH AGUA HEDIONDA TRUNK SEWER REACH NAHT1A PROJECT NAME NONE PROJECT NO. PROJECT LOCATION MAP: PROJECT LOCATION: NAHT1A Along the north side of Tamarack Avenue from El Camino Real to Calavera Hills Treatment Plant. PROJECT DESCRIPTION: Remove existing forcemain and construct 5,000 feet of 8-inch diameter gravity sewer pipeline. PROJECT NEED: When the Calavera Hills Sewer Treatment Plant was initially constructed, there was no provision for extending a gravity sewer line downstream of the plant. When the decision was made not to activate the plant, the sewer mains discharging into the plant site were connected to force main pipe which was originally intended to carry flow up to the plant from projects located downstream of the plant. The existing force main is not sloped properly to handle gravity flow and lacks the necessary access holes for proper maintenance. Removal of the existing force main and construction of a new gravity line will complete this portion of the Sewer Master Plan. FINANCING: Purpose Planning/Study Design/Environmental Construction Adm in/Inspection Total Cost= Estimated Cost $10,000 $47,000 $2,650,000 $155,000 $2,862,000 Funding Source Sewer Replacement Sewer Replacement Sewer Replacement Sewer Replacement Page 75 CAPITAL PROJECT DESCRIPTION SEWER COLLECTION SYSTEM -NORTH BATIQUITOS INTERCEPTOR REHABILITATION PROJECT NAME 3538 PROJECT NO. PROJECT LOCATION MAP: PROJECT LOCATION: Nbatint North side of Batiquitos Lagoon from El Camino Real west to North Batiquitos Lift Station. PROJECT DESCRIPTION: During high rainfall periods, the Batiquitos Lagoon level rises to flood above the existing access road and access hole covers. The project will design a new access road to the sewer and raise access hole covers to a higher elevation where required. PROJECT NEED: To avoid accidental sewage spill, reduce inflow to the sewer, and allow for maintenance vehicles to access the sewer. FINANCING: Purpose Design Environmental Land Acquisition Construction Adm in/Inspection Total Cost= Estimated Cost $270,000 $80,000 $30,000 $719,000 $100,000 $1,199,000 Funding Source Sewer Replacement Sewer Replacement Sewer Replacement Sewer Replacement Sewer Replacement Page 76 CAPITAL PROJECT DESCRIPTION SEWER COLLECTION SYSTEM -POINSETTIA SEWAGE LIFT STATION ODOR AND NOISE ABATEMENT PROJECT NAME 3875 PROJECT NO. ------------------------------------------------------~-----------------------------------------------------. PROJECT LOCATION MAP: Poinlift PROJECT LOCATION: 2425 Poinsettia Lane -Poinsettia Sewage Lift Station. PROJECT DESCRIPTION: Installation of an activated carbon adsorption odor control system, including ducting, to treat foul air from the lift station wetwell to reduce corrosion and control odor emissions, and sound enclosures for outdoor fans. PROJECT NEED: The existing lift station emits odors that can reach future developments in close proximity to the lift station. In addition, uncovered supply and exhaust fans generate noise that reach or exceed 60 dBa at the fenceline. Control of the odors and reduction of noise will promote "good neighbor" policy and a higher level of service to adjacent residents. FINANCING: Purpose Design Construction Adm in/Inspection Total Cost= Estimated Cost $60,000 $589,500 $20,000 $669,500 Annual Operating Cost= $11,000 . Funding Source Sewer Replacement Sewer Replacement Sewer Replacement Page 77 CAPITAL PROJECT DESCRIPTION SEWER COLLECTION SYSTEM -REMOVAL OF EXISTING LIFT STATIONS PROJECT NAME NONE PROJECT NO. PROJECT LOCATION MAP: PROJECT LOCATION: Rem_lift • Gateshead • Vancouver • Simsbury • Villas PROJECT DESCRIPTION: Remove existing lift stations and construct new gravity sewer. PROJECT NEED: Identified in 2003 Sewer Master Plan Update. Removal of lift stations will reduce maintenance and operation costs. FINANCING: Purpose Environmental Design Property Aquisition Construction Adm in/Inspection Total Cost= Estimated Cost $598,000 $360,000 $50,000 $4,063,000 $460,000 $5,531,000 Funding Source Sewer Replacement Sewer Replacement Sewer Replacement Sewer Replacement Sewer Replacement Page 78 CAPITAL PROJECT DESCRIPTION SEWER COLLECTION SYSTEM -SEWER LIFT STATION -MISCELLANEOUS REPAIRS & UPGRADES PROJECT NAME 3840 PROJECT NO. PROJECT LOCATION MAP: PROJECT LOCATION: Sewerlft Villas, Terramar and Gateshead sewer lift stations. PROJECT DESCRIPTION: Repair and upgrade various sewer lift stations throughout the City. Repairs include replacing existing malfunctioning alarm dialers at the Home Plant and Villas Sewer Lift Stations; replacing old pumps at the Terramar, Villas and Gateshead Sewer Lift Stations; replacing existing gas monitoring units, and the wet well lining at the Villas Sewer Lift Station. PROJECT NEED: These projects are needed to properly maintain the existing sewer lift stations and prevent potential sewage spills. Many of the existing stations are 15 years or older and require periodic upgrades and/or replacement of pumps and electrical systems to increased maintenance costs. FINANCING: Purpose Design Construction Adm in/Inspection Total Cost= Estimated Cost $40,000 $1,275,380 $45,000 $1,360,380 Funding Source Sewer Replacement Sewer Replacement Sewer Replacement Page 79 CAPITAL PROJECT DESCRIPTION SEWER COLLECTION SYSTEM -SEWER LINE REFURBISHMENT/REPLACEMENT PROJECT NAME 3927 & 5503 PROJECT NO. PROJECT LOCATION MAP: PROJECT LOCATION: VARIOUS LOCATIONS THROUGHOUT THE CITY SEWERLNE Various locations within the City sewer limits. PROJECT DESCRIPTION: Clean and refurbish existing sewer lines older than 30 years or replace if not able to refurbish. The sewer lines needing repair will be determined by yearly TV inspection. PROJECT NEED: Maintain system in good condition to avoid major problems. FINANCING: Purpose Estimated Cost Funding Source Design/Construction $5,974,600 Sewer Replacement Total Cost= $5,974,600 Page 80 CAPITAL PROJECT DESCRIPTION SEWER COLLECTION SYSTEM -MASTER PLAN/CONNECTION FEE UPDATE PROJECT NAME 5511 PROJECT NO. PROJECT LOCATION MAP: PROJECT LOCATION: LOCATIONS THROUGHOUT THE CITY Mstrplan Throughout the City. PROJECT DESCRIPTION: Update the City's 2003 Sewer Master Plan based on anticipated growth projections. PROJECT NEED: The Master Plan update will help identify the need for changes to planned facilities based on the timing of growth projections and Growth Management Standards. FINANCING: Purpose Report/Adm in Report/Ad min Total Cost= Estimated Cost Funding Source $400,000 Sewer Replacement $100,000 Sewer Connection $500,000 Page 81 PROJECT LOCATION MAP: SEWERMON CAPITAL PROJECT DESCRIPTION 3952 & 5504 SEWER COLLECTION SYSTEM -SEWER MONITORING PROGRAM PROJECT NAME PROJECT NO. NIA PROJECT LOCATION: Citywide within the City's sewer service area. PROJECT DESCRIPTION: Monitor sewer flows and remaining capacities in lines and pump stations within the Carlsbad sewer service area. Perform sewer flow measurements when required. Update Sewer Master Plan and review adequacy of sewer fees as required. PROJECT NEED: To ensure that sewer flows do not exceed line capacity and to ensure timely upgrades of sewer systems in conformance with the Growth Management Standards. FINANCING: Purpose Estimated Cost Funding Source Monitoring $352,000 Sewer Connection Total Cost= $352,000 Page 82 TERRAMAR_2 Page 83 CAPITAL PROJECT DESCRIPTION 5502 SEWER COLLECTION SYSTEM – TERRAMAR LIFT STATION REPLACEMENT PROJECT NO. PROJECT NAME PROJECT LOCATION MAP: PROJECT LOCATION: On the north side of Cannon Road between Carlsbad Boulevard and the railroad right-of-way. PROJECT DESCRIPTION: Replace the existing lift station to meet current state wastewater discharge requirements and industry standards. PROJECT NEED: The existing sewer lift station facility, constructed in 1963, has reached its useful life and should be replaced. FINANCING: Purpose Estimated Cost Funding Source Studies/Design $50,000 Sewer Replacement Environmental $25,000 Sewer Replacement Construction $428,000 Sewer Replacement Admin/Inspection $45,000 Sewer Replacement Total Cost = $548,000 PROJECT LOCATION MAP: Agua lift CAPITAL PROJECT DESCRIPTION SEWER COLLECTION SYSTEM -VISTA/CARLSBAD INTERCEPTOR AGUA HEDIONDA LIFT STATION (VC 12) PROJECT NAME PROJECT LOCATION: 3492 PROJECT NO. On the south shore of Agua Hedionda Lagoon adjacent to the east side of the railroad tracks. PROJECT DESCRIPTION: Upgrade existing pump station to increase capacity for buildout conditions. Replace existing pumps with larger capacity pumps and associated appurtenances. Carlsbad shares the total cost of the project with the City of Vista at a 50/50% share. PROJECT NEED: Required to handle sewage flows for buildout population. FINANCING: Purpose Environmental Design Construction Total Cost= Estimated Cost $500,000 $600,000 $16,300,000 $17,400,000 * *Includes Vista's share of costs. Funding Source Sewer Connection Fee Sewer Connection Fee Sewer Connection Fee Page 84 CAPITAL PROJECT DESCRIPTION SEWER COLLECTION SYSTEM -VISTA/CARLSBAD FORCE MAIN (VC-4) PROJECT NAME 5508 PROJECT NO. PROJECT LOCATION MAP: PROJECT LOCATION: .,/~;::'- _/_,,-_; /,--------------, /,-' :' ,' / { _____ ,,.... '-... .-" ..._ _/ \ ------:, Buenlift Along the south shore of the Buena Vista Lagoon between the Buena Vista Lift Station and 1-5. PROJECT DESCRIPTION: Construct new 21" force main and rehabilitate existing force main to provide dual force mains. PROJECT NEED: Increase capacity of sewer force main system to accommodate future sewer generation. FINANCING: Purpose Design Environmental Construction Adm in/Inspection Total Cost= Estimated Cost $565,000 $50,000 $5,430,000 $180,000 $6,225,000 * * Includes Vista's share of costs. Funding Source Sewer Connection Fee Sewer Connection Fee Sewer Connection Fee Sewer Connection Fee Page 85 CAPITAL PROJECT DESCRIPTION SEWER COLLECTION SYSTEM -VISTA/CARLSBAD INTERCEPTOR SEWER REACH VC118 PROJECT NAME 3886 PROJECT NO. PROJECT LOCATION MAP: PROJECT LOCATION: SEWVC11B PACIFIC OCEAN ENCINA WATER POLLUTION CONTROL FACILITY AGUA HEDIONDA LAGOON -_\ -,:-_ r -_., - Along NCTD railroad right-of-way from Olive Avenue south across Agua Hedionda Lagoon to the Agua Hedionda Lift Station. PROJECT DESCRIPTION: Replace existing Vista/Carlsbad Interceptor Sewer Reach VC11 B and bridge (wood trestle) with 800 feet of 54-inch pipeline and a new concrete bridge. Project cost is shared with the City of Vista. PROJECT NEED: Required to handle buildout flows by replacing existing pipeline and the wood bridge. FINANCING: Purpose Environmental Design Construction Total Cost= Estimated Cost Funding Source $100,000 $200,000 $6,130,000 $6,430,000 * Sewer Connection Fee Sewer Connection Fee Sewer Connection Fee *Includes Vista's share of costs. Page 86 CAPITAL PROJECT DESCRIPTION 3949 SEWER COLLECTION SYSTEM -VISTA/CARLSBAD INTERCEPTOR SEWER REACHES VC13 TO VC15 PROJECT NAME PROJECT NO. PROJECT LOCATION MAP: PACIFIC OCEAN PROJECT VC13VC15 ENCINA WATER POLLUTION CONTROL FACILITY AGUA " HEDIONDA LAGOON PROJECT LOCATION: From the Agua Hedionda Lift Station south to the Encina Water Pollution Control Facility. PROJECT DESCRIPTION: Replace existing Vista/Carlsbad Interceptor Sewer Reaches VC 13 to VC 15 with a 54" pipeline. Project cost is shared with the City of Vista. -, -.. _ / -/ PROJECT NEED: Required to handle buildout flows and deteriorated pipelines. FINANCING: Purpose Design Construction Total Cost= Estimated Cost Funding Source $700,000 Sewer Connection Fee $14,000,000 Sewer Connection Fee $14,700,000 * *Includes Vista's share of costs. Page 87 CAPITAL PROJECT DESCRIPTION SEWER COLLECTION SYSTEM -VISTA/CARLSBAD INTERCEPTOR SEWER REHABILITATION REACHES 1 THRU 3 PROJECT NAME 3867 & 3950 PROJECT NO. PROJECT LOCATION MAP: PROJECT LOCATION: VCinterc Reaches 1, 2 and 3 of the Vista/Carlsbad Interceptor Sewer located south of Highway 78 from Jefferson Street to the City limits. PROJECT DESCRIPTION: Reaches 1, 2 and 3 of the Vista/Carlsbad (V/C) 36" Ductile Iron Interceptor and manholes have corroded significantly. VC1 and 2 will be lined with PVC and manholes will be rehabilitated. VC3 will be completely replaced. V/C interceptor is jointly owned by the City of Vista and the City of Carlsbad. Through a joint City agreement, Carlsbad is responsible for 15% of the cost for maintenance and improvements to Reaches 1, 2 and 3. The City of Vista is responsible for managing projects within these reaches. Costs below reflect the City of Carlsbad's share of project. PROJECT NEED: • Increase safety: Pipeline and manholes have been determined to be in poor condition. Risk of pipeline failure and sewage spill in environmentally sensitive area exists. • Unmet needs: Manholes are currently unlined. Concrete is exposed to hydrogen sulfide environment. Lining will increase longevity of the manhole. Lining of pipeline will reduce ground water infiltration into the wastewater system. FINANCING: Purpose Estimated Cost Funding Source Design/Construction $2,688,200 Sewer Connection Fee Total Cost= $2,688,200 * *Cost includes Administration and Inspection costs. Page 88 WATER PROJECTS WATER DISTRIBUTION SYSTEM PROJECTS . FUNDING MATRIX FOR WATER DISTRIBUTION SYSTEM PROJECTS FUTURE YEAR BUDGET AMOUNTS PROJ FUND FUNDING TOTAL PRIOR YEAR 1 YEAR2 YEAR3 YEAR4 YEARS YEAR 6-10 BUILDOUT NO. NO. PROJECT TITLE SOURCE BUDGET APPROP. 2009-2010 2010-2011 2011-2012 2012-2013 2013-2014 2014-2019 2019-2024 AVIARA PARKWAY AT PLUM TREE WATERREPL 494,728 0 494,728 5023 50231 BUENA VISTA PUMP STATION IMPROVEMENTS (STUDY) WATERREPL 200,000 100,000 100,000 3842 38421 CALAVERA HILLS WATER BOOSTER STATION STANDBY GENERATOR WATER CONN 502,444 0 54,100 448,344 CARLSBAD BOULEVARD-SOUTH OF AVENIDA ENCINAS WATER REPL 953,888 0 953,888 5007 50071 CATHODIC PROTECTION PROGRAM WATERREPL 1,246,700 624,000 475,800 146,900 5012 50121 COLLEGE BOULEVARD-CANNON TO BADGER LANE WATER CONN 1,066,000 1,066,000 5013 50131 COLLEGE BOULEVARD (ECR TO CANNON ROAD) -Reimb WATER CONN 1,060,000 530,000 530,000 CRESTVIEW DRIVE TRANSMISSION MAIN WATER REPL 162,032 0 33,800 128,232 3376 33762 D RESERVOIR -PHASE II WATER CONN 6,666,504 0 6,666,504 3376 33761 D RESERVOIR -PHASE II WATER REPL 2,222,064 0 2,222,064 5014 50141 D RESERVOIR DRAINAGE IMPROVEMENTS (STUDY) WATER REPL 175,000 135,000 40,000 DESALINATION GROUNDWATER/SEAWATER STUDY WATER REPL 774,176 0 774,176 3912 39121 EL FUERTE -NORTH OF LOKER -(Reimb -included in road project) WATER CONN 250,000 250,000 EL FUERTE AND CORINTIA STREET WATER REPL 168,168 0 168,168 3900 39001 ELLERY WATER PUMP PROJECT WATERREPL 205,900 23,495 182,405 5015 50151 GROUNDWATER DEVELOPMENT-SAN LUIS REY RIVER (STUDY) WATER REPL 55,000 0 55,000 HYDROELECTRIC RENEWABLE ENERGY DEVELOPMENT WATERREPL 1,250,000 0 1,250,000 KELLY RANCH DOMESTIC WATER PRESSURE REDUCTION WATER REPL 355,000 0 355,000 3821 38211 LAKE CALAVERA RESERVOIR IMPROVEMENTS WATER REPL 6,796,908 6,646,908 150,000 5009 50091 MAERKLE FACILITY IMPROVEMENTS WATER REPL 2,135,200 1,870,200 265,000 5004 50042 MAERKLE PUMP STATION IMPROVEMENTS WATER CONN 1,000,200 0 85,000 915,200 5004 50041 MAERKLE PUMP STATION IMPROVEMENTS WATERREPL 998,427 44,322 85,000 869,105 5006 50061 MAERKLE RESERVOIR BRIDGE REPLACEMENT WATERREPL 328,750 328,750 MAERKLE RESERVOIR STORAGE (TAP #2) WATER CONN 14,814,280 0 14,814,280 5001 50011 MAERKLE TRANSMISSION MAIN WATERREPL 6,330,000 4,875,000 1,455,000 MARRON ROAD-PRESSURE REGULATING STATION TO OCEANSIDE WATER CONN 797,888 30,688 767,200 5016 50161 MASTER PLAN UPDATE WATER CONN 650,000 500,000 150,000 3904 39041 MISCELLANEOUS PIPELINE REPLACEMENT PROJECTS WATER REPL 1,876,700 1,000,000 433,000 443,700 3822 38221 MISCELLANEOUS WATER RESERVOIR FENCING WATERREPL 197,399 197,399 5019 50191 MISCELLANEOUS WATER VALVE REPAIRS/REPLACEMENTS WATERREPL 250,000 125,000 125,000 3531 35311 OCEANSIDE INTERTIE UPGRADE WATER REPL 114,600 0 114,600 POINSETTIA LANE -EL CAMINO REAL TO SKIMMER CT (Reimb) WATER CONN 130,728 0 130,728 POINSETTIA LANE -SKIMMER CT TO CASSIA WATER REPL 508,664 0 508,664 POINSETTIA LANE -SKIMMER CT TO CASSIA WATER CONN 398,944 0 398,944 POINSETTIA LANE EAST OF BLACK RAIL ROAD 12" WATER CONN 239,720 0 239,720 POINSETTIA LANE EAST OF BLACK RAIL ROAD 12" WATER REPL 239,616 0 239,616 5020 50201 PRESSURE REDUCING STATION REPLACEMENT WATER REPL 1,102,000 1,102,000 RESERVOIR REPAIR /MAINTENANCE PROGRAM WATER REPL 125,000 0 125,000 5008 50081 TRI-AGENCIES WATER TRANSMISSION PIPELINE REPLACEMENT WATER REPL 6,455,000 605,000 650,000 5,200,000 3664 36641 WATER SYSTEM INTERTIE CONNECTION WATERREPL 439,000 34,774 404,226 Page 89 PROJECT LOCATION MAP: Aviara CAPITAL PROJECT DESCRIPTION NONE WATER DISTRIBUTION SYSTEM -AVIARA PARKWAY PROJECT NAME PROJECT NO. ~RD, PROJECT LOCATION: Aviara Parkway at Plum Tree, north to Mariposa Street, then east to Sapphire Drive. PROJECT DESCRIPTION: Construct 3,100 feet of 8-inch watermain. PROJECT NEED: Provide redundant supply to residential development. FINANCING: Purpose Construction Adm/Design/lnsp Total Cost= Estimated Cost Funding Source $397,728 Water Replacement $97,000 Water Replacement $494,728 Page 90 CAPITAL PR J BUENA IPTI N NONE PROJECT NO. The existing water pump station is over 30 years old and various components have previously failed. The facility needs to be upgraded to current standards and codes. FINANCING: Study Total Cost= Estimated Cost $200,000 $200,000 Water Replacement Page 91 CAPITAL PROJECT DESCRIPTION WATER DISTRIBUTION SYSTEM -CALAVERA HILLS WATER BOOSTER STATION STANDBY GENERATOR PROJECT NAME 3842 PROJECT NO. PROJECT LOCATION MAP: PROJECT LOCATION: \ Cal hills \ ___ cg~ Q¥ _O_g__~~I~E-___________________________ -, ~CT~~ I ,, r-, ·r--; / \ , LAKE • J CALAVERA College Boulevard at Carlsbad Village Drive. PROJECT DESCRIPTION: Furnish and install standby generator and generator building at Calavera Hills Booster Pump Station. PROJECT NEED: The existing booster station at this location does not have backup power. If an electrical power outage occurs, the pump station will not operate. The addition of a permanent generator at this facility will increase reliability in accordance with Council goals. FINANCING: Purpose Design/Adm/lnsp Construction Total Cost= Estimated Cost Funding Source $105,000 Water Connection $397,444 Water Connection $502,444 Page 92 CAPITAL PROJECT DESCRIPTION NONE WATER DISTRIBUTION SYSTEM -CARLSBAD BOULEVARD SOUTH OF AVENIDA ENCINAS PROJECT NO. PROJECT LOCATION MAP: Cbadblv2 PROJECT NAME PROJECT LOCATION: Carlsbad Boulevard from Avenida Encinas south to District boundary. PROJECT DESCRIPTION: Construct 4,900 feet of 12-inch watermain. PROJECT NEED: Provides a two-way emergency connection with San Diego Water District 240 Zone. Can also supply water to 318 Zone west of 1-5. FINANCING: Purpose Construction Adm/Design/lnsp Total Cost= Estimated Cost Funding Source $753,888 Water Replacement $200,000 Water Replacement $953,888 Page 93 CAPITAL PROJECT DESCRIPTION WATER DISTRIBUTION SYSTEM -CATHODIC PROTECTION PROGRAM PROJECT NAME 5007 PROJECT NO. PROJECT LOCATION MAP: PROJECT LOCATION: CATHODIC VARIOUS LOCATIONS THROUGHOUT THE CARLSBAD MUNICIPAL WATER DISTRICT Various locations throughout the Carlsbad Municipal Water District. PROJECT DESCRIPTION: Design and construct corrosion control improvements for existing domestic water pipelines, recycled water pipelines, and reservoir associate pipelines. PROJECT NEED: A Cathodic Protection Inspection and Testing Report completed in 2006 identified existing metallic pipelines with no cathodic protection and existing cathodic protection systems were not operating. Corrosion is a major cause of pipeline failure. Mitigating the corrosion process extends pipeline service life, reduces pipeline failures and saves future maintenance and replacement costs. FINANCING: Purpose Design Construction Total Cost= Estimated Cost $143,850 $1,102,850 $1,246,700 Funding Source Water Capital Replacement Water Capital Replacement Page 94 CAPITAL PROJECT DESCRIPTION 5012 WATER DISTRIBUTION SYSTEM -COLLEGE BOULEVARD -CANNON ROAD TO BADGER LANE PROJECT NO. PROJECT LOCATION MAP: College PROJECT NAME PROJECT LOCATION: College Boulevard from Cannon Road south to Badger Lane. PROJECT DESCRIPTION: Construct 4, 130 feet of 12-inch watermain. PROJECT NEED: Provides water supply for new development and creates 375 Zone loop east of El Camino Real. FINANCING: Purpose Design Construction Adm/lnsp Total Cost= Estimated Cost $100,000 $906,000 $60,000 $1,066,000 Funding Source Water Connection Water Connection Water Connection Page 95 CAPITAL PROJECT DESCRIPTION WATER DISTRIBUTION SYSTEM -COLLEGE BOULEVARD (ECR TO CANNON ROAD) PROJECT NAME 5013 PROJECT NO. PROJECT LOCATION MAP: PROJECT LOCATION: Colleges College Boulevard from 400' north of El Camino Real northerly to future Cannon Road. PROJECT DESCRIPTION: Install 4,000 LF of 16-inch line. (In 490 H.G. Zone) PROJECT NEED: To meet the future demands of the area from LFMP Zones 14 and 15. Developer to pay 50% of cost. FINANCING: Purpose Estimated Cost Funding Source Design/Construction $530,000 Water Connection Fee Design/Construction $530,000 * Other -Developer Total Cost= $1,060,000 *Developer cost shown in CIP schedules. Page 96 CAPITAL PROJECT DESCRIPTION WATER DISTRIBUTION SYSTEM -CRESTVIEW DRIVE TRANSMISSION MAIN PROJECT NAME NONE PROJECT NO. PROJECT LOCATION MAP: PROJECT LOCATION: No_agua Crestview Drive west of El Camino Real. PROJECT DESCRIPTION: Construct 600 feet of 8-inch diameter pipeline. PROJECT NEED: To provide a redundant water supply to existing residential area. FINANCING: Purpose Design Construction Total Cost= Estimated Cost Funding Source $30,000 Water Replacement $132,032 Water Replacement $162,032 Page 97 PROJECT LOCATION MAP: D_Resll CAPITAL PROJECT DESCRIPTION 3376 WATER DISTRIBUTION SYSTEM -"D" RESERVOIR PHASE II PROJECT NAME PROJECT NO. PROJECT LOCATION: Adjacent to existing "D" Reservoir. PROJECT DESCRIPTION: Construct new 8.5 MG water reservoir to service 375 Zone. PROJECT NEED: Provide additional daily storage within the distribution system for ultimate demands. FINANCING: Purpose Construction Construction Total Cost= Estimated Cost Funding Source $6,666,504 Water Connection $2,222,064 Water Replacement $8,888,568 Page 98 D_RESERVOIR Page 99 CAPITAL PROJECT DESCRIPTION NONE WATER DISTRIBUTION SYSTEM – D RESERVOIR DRAINAGE IMPROVEMENTS PROJECT NO. PROJECT NAME PROJECT LOCATION MAP: PROJECT LOCATION: D Reservoir site along Black Rail Road. PROJECT DESCRIPTION: Design and construct on-site drainage improvements to accommodate stormwater runoff from the D Reservoir site. PROJECT NEED: Existing stormwater runoff from the D Reservoir site has caused erosion downstream affecting private property. FINANCING: Purpose Estimated Cost Funding Source Design/Environmental $25,000 Water Replacement Construction $150,000 Water Replacement Total Cost = $175,000 CAPITAL PROJECT DESCRIPTION WATER DISTRIBUTION SYSTEM -DESALINATION GROUNDWATER/SEAWATER STUDY PROJECT NAME NONE PROJECT NO. PROJECT LOCATION MAP: PROJECT LOCATION: N/A DESALINA Not Applicable. PROJECT DESCRIPTION: Preparation of a report investigating various methods of treating City owned groundwater located in the San Luis aquifer in Oceanside and identifying conveyance methods to transport the treated water to Carlsbad. Also included is a study of the feasibility of constructing a seawater desalination plant and identifying potential sites upon which to construct a desalination plant. PROJECT NEED: To develop supplemental source of water. FINANCING: Purpose Estimated Cost Funding Source Planning Study $774,176 Water Replacement Total Cost= $774,176 Page 100 PROJECT LOCATION MAP: ELFUERT5 CAPITAL PROJECT DESCRIPTION WATER DISTRIBUTION SYSTEM -EL FUERTE (NORTH OF LOKER) PROJECT NAME PROJECT LOCATION: 3912 PROJECT NO. El Fuerte Avenue between Loker north to future Faraday Avenue. PROJECT DESCRIPTION: Install 2,200 LF of 16-inch line. (In 700-550 H.G. Zone). PROJECT NEED: To meet the future demands of the area. Developer to pay 75% of the cost. Provides looped supply to new North 700 Zone. FINANCING: Purpose Estimated Cost Design/Construction $250,000 Design/Construction $246,900 * Total Cost= $496,900 *Developer cost not shown in CIP schedules. Funding Source Water Connection Fee Other -Developer Page 101 PROJECT LOCATION MAP: EIFuert3 CAPITAL PROJECT DESCRIPTION WATER DISTRIBUTION SYSTEM -EL FUERTE AND CORINTIA STREET PROJECT NAME PROJECT NO. PROJECT LOCATION: Intersection of El Fuerte and Corintia Street. PROJECT DESCRIPTION: Construct Pressure Reducing Station. PROJECT NEED: Provide redundant water supply to 680,580 South and 510 Zones. FINANCING: Purpose Construction Adm/Design/lnsp Total Cost= Estimated Cost Funding Source $133, 168 Water Replacement $35,000 Water Replacement $168,168 Page 102 PROJECT LOCATION MAP: Waterpmp CAPITAL PROJECT DESCRIPTION WATER DISTRIBUTION SYSTEM -ELLERY WATER PUMP PROJECT PROJECT NAME PROJECT LOCATION: Ellery Pump Station -Janis Way. PROJECT DESCRIPTION: 3900 PROJECT NO. The Water District's Ellery Pump Station is designed to maintain adequate flow during fire demands and boost pressure in the event of a significant drop in pressure or increase in demand. The pump station operates from a motor control center that has a service life in excess of twenty years. The scope of this project is the replacement of the pump station's motor control center. PROJECT NEED: The motor control center for the Ellery Pump Station has over twenty years of service life. Its design is outdated, major components are obsolete and, as a result, repairs may not be possible. Replacement of the motor control center will ensure reliability, efficiency, availability of parts and the ability to pull maintenance in a safe and timely manner. FINANCING: Purpose Design Construction Adm in/Inspection Total Cost= Estimated Cost $30,000 $155,900 $20,000 $205,900 Funding Source Water Replacement Water Replacement Water Replacement Page 103 PROJECT LOCATION MAP: Faraday CAPITAL PROJECT DESCRIPTION NONE WATER DISTRIBUTION SYSTEM -FARADAY AVENUE EXTENSION PROJECT NAME PROJECT NO. PROJECT LOCATION: In future Faraday Avenue extension between El Fuerte and Melrose Avenue. PROJECT DESCRIPTION: Construct 3,600 feet of 16-inch watermain. PROJECT NEED: Provides looped study to LFMZ Zone 16 and supply to 550 Zone from 700 to 550 PRV. Funds will be used to reimburse developer for construction of 16-inch watermain. FINANCING: Purpose Construction Adm/Design/lnsp Total Cost= Estimated Cost Funding Source · $609,000 Water Connection $167,000 Water Connection $776,000 Page 104 CAPITAL PROJECT DESCRIPTION NONE WATER DISTRIBUTION SYSTEM -GROUNDWATER DEVELOPMENT IN SAN LUIS REY RIVER BASIN PROJECT NO. PROJECT LOCATION MAP: SanluisRey PROJECT NAME PROJECT LOCATION: San Luis Rey River Groundwater Basin PROJECT DESCRIPTION: Study Carlsbad Municipal Water District's groundwater rights in the San Luis Rey River Groundwater Basin. PROJECT NEED: Conduct a study to clarify, define, support, and protect CMWD's development of its water rights in the San Luis Rey River Groundwater Basin. FINANCING: Purpose Estimated Cost Funding Source Study $55,000 Water Replacement Total Cost= $55,000 Page 105 J HYDRORENEWENRGY IPTION NONE PROJECT NO. The project proposes to utilize a bypass system at specific pressure reducing stations along the transmission main between the San Diego County Water Authority Aqueduct Connection #3 and the Maerkle Reservoir with the intent of routing the high pressure water through a series of turbines to produce electricity. The effect of water passing water through the turbine will be a reduction of water pressure to the required level in addition to the added benefit of generating electricity. Based on a feasibility analysis of potential energy generation, the Carlsbad Municipal Water District (CMWD) has identified opportunities to install several turbines at three different locations along Connection #3 which could generate more than 2 million kilowatt hours per year, or approximately 125% of CMWD's annual energy consumption. FINANCING: Design Construction Admin/lnspection Total Cost= Estimated Cost $235,000 $915,000 $100,000 $1,250,000 Water Replacement Water Replacement Water Replacement Page 106 KELRANHIGH_WPR Page 107 CAPITAL PROJECT DESCRIPTION NONE WATER DISTRIBUTION SYSTEM – KELLY RANCH DOMESTIC WATER PRESSURE REDUCTION PROJECT NO. PROJECT NAME PROJECT LOCATION MAP: PROJECT LOCATION: Within Kelly Ranch Village “E” development. PROJECT DESCRIPTION: Property owners in the Kelly Range Village “E” development are experiencing water pressure beyond the 125 psi City of Carlsbad Engineering Standard. The project includes constructing a pressure reducing station within the city right-of- way and closing certain valves to decrease the pressure below the 125 psi standard. An alternative pressure reducing option would be to install a pipeline on Cannon Road and El Camino Real in order to connect to the 255 water pressure zone. PROJECT NEED: The City’s Operation Department has received numerous complaints of high water pressure in the area and has indicated the high pressure has caused failures of the fittings and subsequent flooding of the homes experiencing high water pressure. FINANCING: Purpose Estimated Cost Funding Source Design $40,000 Water Replacement Construction $280,000 Water Replacement Administration $35,000 Water Replacement Total Cost = $355,000 CAPITAL PROJECT DESCRIPTION WATER DISTRIBUTION SYSTEM -LAKE CALAVERA RESERVOIR IMPROVEMENTS PROJECT NAME 3821 PROJECT NO. PROJECT LOCATION MAP: PROJECT LOCATION: Lake_cal CITY OF OCEANSIDE --------------------CITY OF CARLSBAD PROJECT SITE~-- r-- .--J / LAKE CAI.AVERA Lake Calavera in the northeast quadrant of the City. PROJECT DESCRIPTION: The city recently replaced the outlet tower valves and piping to restore function and repaired the existing spillway and channel to improve flow, safety, and access. The remaining tasks include the implementation and monitoring of mitigation measures. PROJECT NEED: The existing valves located within the outlet tower have recently been replaced allowing Calavera Dam to function as a flood control retention facility to help alleviate potential downstream flooding in the area of the Rancho Carlsbad Mobile Home Park. FINANCING: Purpose Estimated Cost Monitoring & Maintenance Adm in/Inspection Total Cost= $110,000 $40,235 $150,000 Funding Source Water Replacement Water Replacement Total cost for Reservoir Improvements = $6,796,908 Page 108 PROJECT LOCATION MAP: MAERK_RES IMPROV. CAPITAL PROJECT DESCRIPTION WATER DISTRIBUTION SYSTEM -MAERKLE FACILITY IMPROVEMENTS PROJECT NAME PROJECT LOCATION: At Maerkle Reservoir. PROJECT DESCRIPTION: 5009 PROJECT NO. Replace the existing wet chlorine gas scrubbers with new dry chlorine gas scrubbers. The existing units are requiring increased attention to remain operable and have reached the end of their useful life. PROJECT NEED: In May 2007, staff commissioned a study to evaluate all the facilities at Maerkle Dam reservoir. The study report identified 20 priority items that need replacement to meet current code requirements for health and safety and to maintain reliability of the water supply source. The replacement of the gas scrubbers was listed as a high priority project. FINANCING: Purpose Design Construction lnspection/Admin Total Cost= Estimated Cost $200,000 $1,818,100 $117,100 $2,135,200 Funding Source Water Replacement Water Replacement Water Replacement Page 109 PROJECT LOCATION MAP: OCEANSIDE PROJECT Maerkle3 CAPITAL PROJECT DESCRIPTION WATER DISTRIBUTION SYSTEM -MAERKLE PUMP STATION PROJECT NAME MAERKLE RESERVOIR r ) r r' PROJECT LOCATION: Maerkle Reservoir. PROJECT DESCRIPTION: Enlarge pump station. PROJECT NEED: 5004 PROJECT NO. Required for emergency supply from Maerkle Reservoir. FINANCING: Purpose Design Environmental Construction Adm in/Inspection Total Cost= Estimated Cost $100,000 $50,000 $1,668,627 $180,000 $1,998,627 Funding Source Water Connection/Replace Water Connection/Replace Water Connection/Replace Water Connection/Replace Page 110 CAPITAL PROJECT DESCRIPTION WATER DISTRIBUTION SYSTEM -MAERKLE RESERVOIR BRIDGE REPLACEMENT PROJECT NAME 5006 PROJECT NO. PROJECT LOCATION MAP: PROJECT LOCATION: ;-····· MAERK_RES //'·,.,,, , \ / \ I \ ( i i i -~~ \__ .... -··, ; ; Access bridge at Maerkle Reservoir. PROJECT DESCRIPTION: Remove existing damaged access bridge and replace with a prefabricated steel truss bridge. It is assumed the existing abutments will be reused. PROJECT NEED: Replacement of existing damaged bridge is necessary to maintain site access. FINANCING: Purpose Design Construction Adm in/Inspection TQtal Cost= Estimated Cost $36,685 $275,000 $17,065 $328,750 Funding Source Water Replacement Water Replacement Water Replacement Page 111 CAPITAL PROJECT DESCRIPTION WATER DISTRIBUTION SYSTEM -MAERKLE RESERVOIR STORAGE (TAP #2) PROJECT NAME NONE PROJECT NO. PROJECT LOCATION MAP: PROJECT LOCATION: /' ·, ; OCEANSIDE MAERKLE .. .... .. .... .. --~ RESERVOIR , r\-?·· .... PROJECT Maerkle Adjacent to Maerkle Reservoir. PROJECT DESCRIPTION: Construct buried 15 MG water storage reservoir next to existing Maerkle Reservoir. PROJECT NEED: Provides additional emergency storage to meet 10-day storage criteria based on ultimate demands. FINANCING: Purpose Construction Adm/Design/lnsp Total Cost= Estimated Cost Funding Source $13,339,280 Water Connection $1,475,000 Water Connection $14,814,280 Page 112 CAPITAL PROJECT DESCRIPTION 5001 WATER DISTRIBUTION SYSTEM -MAERKLE RESERVOIR TRANSMISSION MAIN PROJECT NO. PROJECT LOCATION MAP: I \ r--1 r."'iF"'~~-. : _ _, I I ,, ....... ..,.,,,,,....,,.,.. Maerkle2 I 'I I PROJECT ( __ _I I \ \ MAERKLE RESERVOIR PROJECT NAME L ______ _ I I i I I L PROJECT LOCATION: From Maerkle Reservoir west to the future extension of College Boulevard. PROJECT DESCRIPTION: Install 9,300 LF of 36-inch waterline. (In 490 H.G. Zone). PROJECT NEED: Increase supply from Maerkle Reservoir and provide redundant supply pipeline. Supply to new 490 Zone development east of El Camino Real. FINANCING: Purpose Study Environmental Design Property Acquisition Construction Admin/1 nspection Total Cost= Estimated Cost $175,000 $200,000 $600,000 $10,000 $5,120,000 $225,000 $6,330,000 Funding Source Water Replacement Water Replacement Water Replacement Water Replacement Water Replacement Water Replacement Page 113 CAPITAL PROJECT DESCRIPTION NONE WATER DISTRIBUTION SYSTEM -MARRON ROAD (PRESSURE REGULATING STATION TO OCEANSIDE) PROJECT NAME PROJECT NO. PROJECT LOCATION MAP: MARRON RD PROJECT LOCATION: Marron Road from Avenida de Anita easterly 6,600 feet. PROJECT DESCRIPTION: Install 6,600 LF of 12-inch line and two pressure regulating stations. Developer to pay 50% of cost. PROJECT NEED: To meet future demands in accordance with Growth Management Standards. Provide additional supply to 255 Zone. FINANCING: Purpose Estimated Cost Design/Construction $797,888 Design/Construction $797,888 * Total Cost= $1,595,776 *Developer cost not included in CIP schedules. Funding Source Water Connection Other -Developer Page 114 CAPITAL PROJECT DESCRIPTION WATER DISTRIBUTION SYSTEM -MASTER PLAN UPDATE PROJECT NAME 5016 PROJECT NO: ................................................................................................... ~ ................................................................................................. .... PROJECT LOCATION MAP: LOCATIONS THROUGHOUT THE CITY Mstrplan PROJECT LOCATION: Throughout the City. PROJECT DESCRIPTION: Update the CMWD's 2003 Water Master Plan based on anticipated growth projections and obtain necessary CEQA approval through an amendment to the EIR for adoption by City Council. The Master Plan Update will include the 2010 Urban Water Management Plan (UWMP) requirement. The UWMP will analyze availability of water for CMWD, compare growth projections to water availability, document CMWD's Drought Management Plan, and analyze water conservation plans. PROJECT NEED: The Master Plan update will help identify the need for changes to planned facilities based on the timing of growth projections and Growth Management Standards. FINANCING: Study Total Cost= Estimated Cost $650,000 $650,000 Funding Source Water Connection Page 115 CAPITAL PROJECT DESCRIPTION WATER DISTRIBUTION SYSTEM -MELROSE DRIVE·..PALOMAR AIRPORT ROAD TO FARADAY PROJECT NAME 5017 PROJECT NO. PROJECT LOCATION MAP: PROJECT LOCATION: /}J?. Melrose Melrose Drive between Palomar Airport Road and Faraday Avenue. PROJECT DESCRIPTION: Construct 4,000 feet of 16-inch watermain. PROJECT NEED: Provide looped supply to new North 700 Zone in LFMZ Zone 16 business park. Funds will be used to reimburse developer required to construct 16-inch watermain. FINANCING: Purpose Construction Adm/Design/lnsp Total Cost= Estimated Cost Funding Source $1,288,500 Water Connection $186,500 Water Connection $1,475,000 Page 116 CAPITAL PROJECT DESCRIPTION WATER DISTRIBUTION SYSTEM -MISCELLANEOUS PIPELINE REPLACEMENTS PROJECT NAME 3904 PROJECT NO. PROJECT LOCATION MAP: PROJECT LOCATION: CITYWIDE WTR_PIPE Various locations. PROJECT DESCRIPTION: Replace existing small diameter and older pipelines at 14 locations. PROJECT NEED: Provide increased water supply to meet fire flow requirements. FINANCING: Purpose Design Construction Adm in/Inspection Total Cost= Estimated Cost $150,000 $1,676,700 $50,000 $1,876,700 Funding Source Water Replacement Water Replacement Water Replacement Page 117 CAPITAL PROJECT DESCRIPTION WATER DISTRIBUTION SYSTEM -MISCELLANEOUS WATER RESERVOIR FENCING PROJECT NAME 3822 PROJECT NO. PROJECT LOCATION MAP: PROJECT LOCATION: SANTA FE II ~ Reservoirs At various water reservoir locations throughout the City as shown on the map including the TAP, "C", "E", Santa Fe II and La Costa Lo. PROJECT DESCRIPTION: Install protective fencing around the identified reservoir sites for safety and security purposes. PROJECT NEED: Project is required to protect the existing reservoir sites from vandalism and to ensure safety of the public. Ongoing development in the City has made these once isolated reservoir sites more accessible to the public thus intensifying the need for protective fencing. FINANCING: Purpose Estimated Cost Funding Source Construction $197,399 Water Replacement Total Cost= $197,399 Page 118 PROJECT LOCATION MAP: CAPITAL PROJECT DESCRIPTION WATER DISTRIBUTION SYSTEM -MISCELLANEOUS WATER VALVE REPAIR I REPLACEMENT PROGRAM PROJECT NAME PROJECT LOCATION: 5019 PROJECT NO. Various locations throughout the Carlsbad Municipal Water District service area. PROJECT DESCRIPTION: Ongoing program to repair/replace broken or malfunctioning water valves. PROJECT NEED: VARIOUS LOCATIONS The repair/replacement of inoperable valves is an integral component of a well-managed valve maintenance program reducing water loss and supports achieving the performance measurement of potable water distribution system integrity. There is a current backlog of broken valves needing repair/replacement. FINANCING: Purpose Estimated Cost Funding Source Construction $250,000 Water Replacement Total Cost= $250,000 MISC Page 119 PROJECT LOCATION MAP: OSIDEINT CAPITAL PROJECT DESCRIPTION WATER DISTRIBUTION SYSTEM -OCEANSIDE INTERTIE UPGRADE PROJECT NAME PROJECT LOCATION: El Camino Real near State Highway 78. PROJECT DESCRIPTION: 3531 PROJECT NO. Make improvements to increase reliability of water system intertie with City of Oceanside. System supplies 5 cfs of treated water to Carlsbad. During emergencies and periods of water supply curtailment, the Oceanside intertie provides backup. PROJECT NEED: The system requires valve, pipe, and meter replacement. FINANCING: Purpose Design/Construction Total Cost= Estimated Cost $114,600 $114,600 Funding Source Water Replacement Page 120 PROJECT LOCATION MAP: POINSET2 CAPITAL PROJECT DESCRIPTION WATER DISTRIBUTION SYSTEM -POINSETTIA LANE (EL CAMINO REAL TO SKIMMER COURT) PROJECT NAME PROJECT LOCATION: NONE PROJECT NO. Poinsettia Lane from El Camino Real to Skimmer Court. PROJECT DESCRIPTION: Install 1,300 LF of 12-inch line. (In 375 H.G. Zone). PROJECT NEED: Parallel existing 8-inches to increase capacity in the 375 Zone and supply from 550 Zone. Funds will be used to reimburse the developer required to construct the 12-inch waterline. FINANCING: Purpose Construction Total Cost= Estimated Cost $130,728 $130,728 Funding Source Water Connection Page 121 CAPITAL PROJECT DESCRIPTION WATER DISTRIBUTION SYSTEM -POINSETTIA LANE (SKIMMER COURT TO CASSIA ROAD) PROJECT NAME NONE PROJECT NO. PROJECT LOCATION MAP: PROJECT LOCATION: Poinskim In Poinsettia Lane between Skimmer Court and Cassia Road. PROJECT DESCRIPTION: Construct 4,500 feet of 12-inch watermain. PROJECT NEED: Completes 375 Loop on Poinsettia Lane. Increase capacity to/from D3 Reservoir. FINANCING: Purpose Construction Construction Total Cost= Estimated Cost $398,944 $508,664 $907,608 Funding Source Water Connection Water Replacement Page 122 CAPITAL PROJECT DESCRIPTION WATER DISTRIBUTION SYSTEM -POINSETTIA LANE EAST OF BLACK RAIL ROAD PROJECT NAME NONE PROJECT NO. PROJECT LOCATION MAP: PROJECT LOCATION: Poinblack Poinsettia Lane -1,100 feet east of Black Rail Road. PROJECT DESCRIPTION: Construct 1,100 feet of 30-inch watermain. PROJECT NEED: Increase supply to 550 Zone and D3 Reservoir. FINANCING: Purpose Estimated Cost Funding Source Construction Construction $239,720 Water Connection $239,616 Water Replacement Total Cost= $479,336 Page 123 PRESSURE Page 124 CAPITAL PROJECT DESCRIPTION 5020 WATER DISTRIBUTION SYSTEM – PRESSURE REDUCING STATIONS REHABILITATION / REPLACEMENT PROJECT NO. PROJECT NAME PROJECT LOCATION MAP: PROJECT LOCATION: 1 Terrimar El Camino Real north of Jackspar Drive 2 Lake Shore Gardens Poinsettia Lane and Avenida Encinas 3 Laguna Riviera Kelly Drive 4 Kelly Kelly Drive and El Camino Real 5 Sycamore Creek Sunny Creek Road PROJECT DESCRIPTION: Assess the condition and replacement or upgrade needs of the existing water pressure reducing stations identified above. PROJECT NEED: Rehabilitation or replacement of the various pressure reducing stations will continue to provide safe and reliable water service to the areas they serve. FINANCING: Purpose Estimated Cost Funding Source Design/Environmental $52,000 Water Replacement Construction $1,050,000 Water Replacement Total Cost = $1,102,000 RESERV_STUDY Page 125 CAPITAL PROJECT DESCRIPTION NONE WATER DISTRIBUTION SYSTEM – RESERVOIR REPAIR/MAINTENANCE PROGRAM STUDY PROJECT NO. PROJECT NAME PROJECT LOCATION MAP: PROJECT LOCATION: Steel Reservoirs: Buena Vista, C, D-1, D-2, E, Elm, Ellery, La Costa and Skyline. PSC Reservoirs: Santa Fe II, La Costa High and B (TAP) PROJECT DESCRIPTION: Conduct a study to establish priorities for a comprehensive reservoir repair and maintenance program. Evaluate existing available data from construction drawings, diving and cleaning activities, and inspection reports. Recommend to most cost effective program that meets all standards, requirements and regulations. PROJECT NEED: Most of the steel reservoirs in the CMWD are approaching their estimated operational lifespan. It is anticipated the recommended maintenance program activities will promote tank longevity, enhance water quality, and satisfy California Department of Public Health (CDPH) reservoir requirements. FINANCING: Purpose Estimated Cost Funding Source Study $100,000 Water Replacement Administration $25,000 Water Replacement Total Cost = $125,000 TRIAGENCY Page 126 CAPITAL PROJECT DESCRIPTION 5008 WATER DISTRIBUTION SYSTEM – TRI-AGENCY WATER TRANSMISSION PIPELINES PROJECT NO. PROJECT NAME PROJECT LOCATION MAP: PROJECT LOCATION: Between the San Diego County Water Authority’s Aqueduct to Calavera Pump Station and Maerkle Reservoir. PROJECT DESCRIPTION: Replace or rehabilitate two water transmission pipelines: Reach 1 is from Aqueduct Connection No. 3 to the Maerkle Reservoir, and Reach 2 is from Leisure Glen to the Calavera Pump Station along College Blvd. PROJECT NEED: In previous years, CMWD has experienced five pipeline breaks on this transmission main. A preliminary assessment has been completed recommending repair or replacing the existing water main. FINANCING: Purpose Estimated Cost Funding Source Design $575,000 Water Replacement Environmental $150,000 Water Replacement Construction $5,550,000 Water Replacement Adm/Insp $180,000 Water Replacement Total Cost = $6,455,000 CAPITAL PROJECT DESCRIPTION WATER DISTRIBUTION SYSTEM -WATER SYSTEM INTERTIE CONNECTION STANDBY GENERATOR PROJECT NAME 3664 PROJECT NO. PROJECT LOCATION MAP: PROJECT LOCATION: WTRINTER I I l __ ci...__, I , __ I I .- 1 I r-, I VID -Business Park Drive Vallecitos Water District Olivenhain Water District San Dieguito Water District PROJECT DESCRIPTION: Construct pipeline system intertie with adjacent water agencies including Vista Irrigation District, Vallecitos Water District, Olivenhain Water District, and San Dieguito Water District. PROJECT NEED: During emergencies, these interties could supply water to the City and also provide water back to the adjacent agencies. FINANCING: Purpose Estimated Cost Funding Source Design/Construction $439,000 Water Replacement Total Cost= $439,000 Page 127 RECYCLED WATER PROJECTS FUNDING MATRIX FOR RECYCLED WATER PROJECTS FUTURE YEAR BUDGET AMOUNTS PROJ FUND FUNDING TOTAL PRIOR YEAR 1 YEAR2 YEAR3 YEAR4 YEARS YEAR 6-10 BUILDOUT NO. NO. PROJECT TITLE SOURCE BUDGET APPROP. 2009-2010 2010-2011 2011-2012 2012-2013 2013-2014 2014-2019 2019-2024 5021 50211 CARLSBAD WATER RECYCLING FACILITY SCADA MODIFICATIONS WATERREPL 210,000 210,000 CHESTNUT AVENUE RECYCLED WATER LINE WATER REPL 716,600 0 716,600 ECR/TAMARACK PUMP STATION REMOVAL WATER REPL 80,019 0 80,019 1-5 CROSSING -AVENIDA ENCINAS TO CAMINO DE LAS ONDAS WATERREPL 134,200 0 134,200 5200 52001 1-5 RECYCLED WATER TRANSMISSION LINE WATERREPL 277,274 0 277,274 3487 34871 PUMP STATION REMOVAL WATER REPL 442,700 442,700 RECYCLED WATER LINE-IRRIGATION SERVICES WATER REPL 240,000 0 240,000 5201 52011 RECYCLED WATER LINE -IRRIGATION SERVICES RECLWATER 230,000 230,000 RECYCLED WATER LINE-INNOVATION WAYAND GATEWAY WATER REPL 410,000 0 410,000 5202 52021 RECYCLED WATER LINE-INNOVATION WAYAND GATEWAY RECLWATER 675,000 675,000 RECYCLED WATER MASTER PLAN UPDATE WATER REPL 495,000 250,000 245,000 12" RECYCLED WATER TRANSMISSION MAIN-CWRF TO CHIQUAPIN WATER REPL 250,000 0 250,000 Page 128 J RecycleWtr T ON NONE PROJECT NO. #19 The project includes the following components: • Microcomputer Hardware and SCADA Upgrades • PLC Control Logic and SCADA Modifications • Combine SCADA Screens The Encina Wastewater Authority (EWA) operates and maintains the Carlsbad Water Recycling Facility pursuant to a Memorandum of Understanding between the Carlsbad Municipal Water District and EWA The improvements are necessary to ensure the efficient operation of the facility to allow for the reliable delivery of reclaimed water to the CMWD. Construction Total Cost= Estimated Cost $210,000 $210,000 Water Replacement Page 129 CAPITAL PROJECT DESCRIPTION RECYCLED WATER PROJECTS -CHESTNUT AVENUE RECYCLED WATER LINE PROJECT NAME NONE PROJECT NO. PROJECT LOCATION MAP: PROJECT LOCATION: Chestnut Chestnut Avenue from 1-5 to SDNR right-of-way. PROJECT DESCRIPTION: Construct an 8-inch PVC recycled waterline in Chestnut Avenue from the existing line in 1-5 to the railroad right-of-way. PROJECT NEED: The new 8-inch line will provide the distribution of recycled water to the future Pine School Park and the Coastal Rail Trail. FINANCING: Purpose Administration Design Construction Total Cost= Estimated Cost Funding Source $30,000 $35,000 $651,600 $716,600 Water Replacement Water Replacement Water Replacement Page 130 CAPITAL PROJECT DESCRIPTION RECYCLED WATER PROJECTS -EL CAMINO REAL AND TAMARACK RW PUMP STATION PROJECT NAME NONE PROJECT NO. PROJECT LOCATION MAP: PROJECT LOCATION: \\ S') \\ ~) ECR_PUMP Southeast corner of El Camino Real and Tamarack Avenue. PROJECT DESCRIPTION: Remove existing pump station and rehabilitate the site. PROJECT NEED: Existing pump station was constructed for the Calavera Wastewater Treatment Plant, which is no longer necessary. Removes attractive nuisance and reduces maintenance needs. FINANCING: Purpose Design Construction Ad min/Inspection Total Cost= Estimated Cost $10,000 $53,519 $16,500 $80,019 Funding Source Water Replacement Water Replacement Water Replacement Page 131 PR J l-5CROSS1NG RIPTI N NONE PROJECT NO. PROJECT LOCATION: Under 1-5 between Avenida Encinas and Camino de las Ondas. PROJECT DESCRIPTION: Convert an existing 12-inch potable water pipeline crossing under 1-5 to recycled water. Two connection points would be required, west of 1-5 on Avenida Encinas and east of 1-5 on Camino de las Ondas. Converting the pipeline to recycled water would provide an increase in capacity from the water reclamation plant to the service area east of 1-5. Currently the only recycled water pipeline crossing 1-5 from the reclamation plant is along Poinsettia Lane. This additional 1-5 crossing would increase reliability with a second crossing. FINANCING: Purpose Design Construction Administration Total Cost= Estimated Cost $13,200 $110,000 $11,000 $134,200 Water Replacement Water Replacement Water Replacement Page 132 CAPITAL PROJECT DESCRIPTION RECYCLED WATER PROJECTS -1-5 RECYCLED WATER TRANSMISSION LINE PROJECT NAME 5200 PROJECT NO. PROJECT LOCATION MAP: PROJECT LOCATION: 3Ui':NA -, r---, ;;;LAKE CALAVERA PROJECT 15TRNSLN 1-5 Freeway from Palomar Airport Road to Carlsbad Village Drive. PROJECT DESCRIPTION: Caltrans installed a transmission main from Poinsettia Lane north to Jefferson Street in 1996. The pipeline was oversized to supply recycled water to areas north of Tamarack Avenue. PROJECT NEED: To supply recycled water to Carlsbad north of Tamarack Avenue. FINANCING: Purpose Estimated Cost Funding Source Design/Construction $277,274 Water Replacement Total Cost= $277,274 Page 133 PROJECT LOCATION MAP: PALOMAR AIRPORT~ ~~ 2c------'~ RCSTNUPG CAPITAL PROJECT DESCRIPTION RECYCLED WATER -PUMP STATION REMOVAL PROJECT NAME PROJECT LOCATION: El Camino Real south of Palomar Airport Road. PROJECT DESCRIPTION: Remove existing pump station and rehabilitate site. PROJECT NEED: 3487 PROJECT NO. Upon completion of Encina Basin Phase II and Carlsbad Boulevard Reclamation Facility Projects, existing pump station is no longer necessary. FINANCING: Purpose Estimated Cost Funding Source Design/Construction $442,700 Water Replacement Total Cost= $442,700 Page 134 BusinessPk Page 135 CAPITAL PROJECT DESCRIPTION 5201 RECYCLED WATER PROJECTS – BUSINESS PARK AND SEA CLIFF DEVELOPMENT PROJECT NO. PROJECT NAME PROJECT LOCATION MAP: PROJECT LOCATION: Miscellaneous locations within the Carlsbad Business Park and one location within the Sea Cliff development. PROJECT DESCRIPTION: Construction of nine new recycled water service lines within the Carlsbad Business Park and moving one existing service line meter and meter box in the Sea Cliff development. PROJECT NEED: In order to serve the 10 sites within the business park and the Sea Cliff development with recycled water, service laterals need to be constructed to these properties. FINANCING: Purpose Estimated Cost Funding Source Administration/Design $30,000 Recycled Water Construction $200,000 Recycled Water Construction $240,000 Water Replacement Total Cost = $470,000 Innovation Page 136 CAPITAL PROJECT DESCRIPTION 5202 RECYCLED WATER PROJECTS – INNOVATION WAY/GATEWAY ROAD RECYCLED WATER LINE PROJECT NO. PROJECT NAME PROJECT LOCATION MAP: PROJECT LOCATION: Innovation Way and Gateway Road. PROJECT DESCRIPTION: Construct 2,500 linear feet of 8-inch PVC recycled waterline in Innovation Way and Gateway Road. PROJECT NEED: Currently, the 660 HGL zone for the recycled water system does not loop through the Bressi Development project, creating excessive flows and lower water pressure. creating this loop will provide reliability and increased level of service. FINANCING: Purpose Estimated Cost Funding Source Administration $50,000 Recycled Water Design $75,000 Recycled Water Construction $550,000 Recycled Water Construction $410,000 Water Replacement Total Cost = $1,085,000 PROJECT LOCATION MAP: RECYCLED CAPITAL PROJECT DESCRIPTION NONE RECYCLED WATER PROJECTS -RECYCLED WATER MASTER PLAN PROJECT NAME PROJECT NO. CITYWIDE PROJECT LOCATION: Citywide PROJECT DESCRIPTION: Update the CMWD's 2003 Recycled Water Master Plan based on improvements added since 2003 and anticipated growth projects. Project could include the approval of a Program Environmental Impact Report (PEIR). PROJECT NEED: The City has experienced significant growth since the approval of the 2003 Recycled Water Master Plan. The update will assist in identifying the need to change planned facilities based on the timing of growth projections and the City's Growth Management Standards. FINANCING: Purpose Estimated Cost Funding Source Design/Environmental $495,000 Water Replacement Total Cost= $495,000 Page 137 CWRFTRAN Page 138 CAPITAL PROJECT DESCRIPTION NONE RECYCLED WATER PROJECTS – 12” RECYCLED WATER TRANSMISSION MAIN (CWRF) TO CHINQUAPIN AVENUE PROJECT NO. PROJECT NAME PROJECT LOCATION MAP: PROJECT LOCATION: Located in Avenida Encinas from the Carlsbad Water Recycling Facility to Cannon Road and continuing northerly to Chinquapin Avenue along a corridor east and parallel to the NCTD right-of-way. PROJECT DESCRIPTION: Prepare design plans for a recycled water transmission line in the existing railroad right-of-way connecting the Carlsbad Water Recycling Facility to the Recycle Water Phase III area. The purpose is to improve system hydraulics by connecting to an existing transmission line in Cannon Road to the Village area. The line will be installed with the Vista/Carlsbad Sewer Project to minimize construction costs. PROJECT NEED: The project will improve the recycled water system hydraulics and water quality with the interconnection to the current system. The project will provide recycled water to the Village area, parks, medians and the Coastal Rail Trail. FINANCING: Purpose Estimated Cost Funding Source Design $220,000 Water Replacement Administration $30,000 Water Replacement Total Cost = $250,000 CIRCULATION SYSTEM PROJECTS TRAFFIC SIGNAL PROJECTS FUNDING MATRIX FOR TRAFFIC SIGNAL PROJECTS FUTURE YEAR BUDGET AMOUNTS PROJ FUND FUNDING TOTAL PRIOR YEAR 1 YEAR2 YEAR3 YEAR4 YEARS YEAR 6-10 BUILDOUT NO. NO. PROJECT TITLE SOURCE BUDGET APPROP. 2009-2010 2010-2011 2011-2012 2012-2013 2013-2014 2014-2019 2019-2024 TRAF SIG -ALGA ROAD AND CAZADERO GAS TAX 210,000 0 210,000 TRAF SIG -ARMADA DRIVE AND GRAND PACIFIC RESORTS GAS TAX 190,000 0 190,000 3369 33691 TRAF SIG -AVIARA PARKWAY-POINSETTIA LANE TO EL CAMINO REAL TIF 29,969 29,969 3369 33692 TRAF SIG -AVIARA PARKWAY-POINSETTIA LANE TO EL CAMINO REAL OTHER 645,447 645,447 3369 33693 TRAF SIG-AVIARA PARKWAY-POINSETTIA LANE TO EL CAMINO REAL GAS TAX 160,000 160,000 6300 63001 TRAF SIG -AVIARA PKWY AND CAMINO DE LAS ONDAS-REIMB GAS TAX 105,000 105,000 6306 63061 TRAF SIG -CALLE BARCELONA AND PASEO AVELLANO GCC 210,000 210,000 TRAF SIG-CAMINO DE LOS COCHES AND LA COSTA AVENUE TRANSNET-LOC 190,000 0 190,000 TRAF SIG -CAMINO VIDA ROBLE AND YARROW DRIVE GAS TAX 190,000 0 190,000 3902 39021 TRAF SIG-CANNON ROAD AND AVENIDA ENCINAS-reim. PFF 150,000 150,000 TRAF SIG -CANNON ROAD AND COLLEGE BOULEVARD TRANSNET-LOC 210,000 0 210,000 6301 63011 TRAF SIG -CARLSBAD BLVD & TAMARACK SIGNAL REPAIRS IRF 230,000 230,000 TRAF SIG-CARLSBAD BOULEVARD AND CHERRY AVENUE GAS TAX 190,000 0 190,000 6302 63021 TRAF SIG -EL CAMINO REAL AND CHESTNUT SIGNAL REPAIRS IRF 276,000 206,000 70,000 6303 63031 TRAF SIG -EL CAMINO REAL AND TAMARACK SIGNAL REPAIRS IRF 200,000 141,000 59,000 TRAF SIG -EL FUERTE ST AND RANCHO PANCHO GAS TAX 190,000 0 190,000 TRAF SIG-FARADAY AVE. AND CAMINO HILLS DRIVE GAS TAX 190,000 0 190,000 TRAF SIG-FARADAY AVENUE AND PALMER WAY GAS TAX 190,000 0 190,000 6312 63121 TRAF SIG-FARADAY AVENUE AND RUTHERFORD ROAD GAS TAX 190,000 190,000 TRAF SIG-LA COSTA AVENUE AND CALLE MADERO GAS TAX 210,000 0 210,000 TRAF SIG -LA COSTA AVENUE AND ESFERA STREET GAS TAX 210,000 0 210,000 TRAF SIG -LA COSTA AVENUE AND GIBRALTAR GAS TAX 210,000 0 210,000 3938 39381 TRAF SIG-LA COSTA AVENUE AND LEVANTE TRANSNET-LOC 210,000 0 210,000 TRAF SIG -LA COSTA AVENUE/NUEVA CASTILLA WAY GAS TAX 210,000 0 210,000 TRAF SIG-MONROE STREET AND HOSP WAY TRANSNET-LOC 210,000 0 210,000 6313 63131 TRAF SIG -PASEO DEL NORTE /HARBOR POINT ROAD GAS TAX 210,000 5,210 204,790 TRAF SIG -POINSETTIA LANE AND BRIGANTINE ROAD GAS TAX 190,000 0 190,000 6307 63071 TRAF SIG-RANCHO SANTA FE ROAD AND AVENIDA LA CIMA GCC 190,000 190,000 TRAF SIG-RANCHO SANTA FE ROAD AND CALLE JUNIPERO GAS TAX 210,000 0 210,000 3406 34061 TRAF SIG-RANCHO SANTA FE ROAD AND QUESTHAVEN ROAD GAS TAX 124,767 124,767 3940 39401 TRAF SIG-TAMARACK AVE. AND PONTIAC DRIVE GAS TAX 210,000 3,954 206,046 TRAF SIG-TAMARACK AVE. AND VALLEY STREET GAS TAX 190,000 0 190,000 6305 63051 VIDEO DETECTION CONVERSION GAS TAX 1,850,000 584,000 277,000 247,000 307,000 300,000 135,000 Page 139 CAPITAL PROJECT DESCRIPTION CIRCULATION SYSTEM TRAFFIC SIGNALS -ALGA ROAD AND CAZADERO DRIVE PROJECT NAME NONE PROJECT NO. PROJECT LOCATION MAP: PROJECT LOCATION: ALGA CAZA At the intersection of Alga Road and Cazadero Drive. PROJECT DESCRIPTION: Installation of a four-leg, fully actuated traffic signal, including a type 170 controller, 200SA local intersection control program, video detection, battery back-up system, appurtenant signing and striping, and signal interconnect to adjacent controllers. PROJECT NEED: Caltrans signal warrants have been met. The intersection is listed on the qualification list of the City's Traffic Signal Evaluation Policy. The installation of this traffic signal will assign the right-of-way for both motorists and pedestrians entering and crossing at the intersection. FINANCING: Purpose Design Construction Adm in/Inspection Total Cost= Estimated Cost $8,000 $190,000 $12,000 $210,000 Funding Source Gas Tax Gas Tax Gas Tax Page 140 ARMADA Page 141 CAPITAL PROJECT DESCRIPTION NONE CIRCULATION SYSTEM TRAFFIC SIGNALS – ARMADA DRIVE AND GRAND PACIFIC RESORTS PROJECT NO. PROJECT NAME PROJECT LOCATION MAP: PROJECT LOCATION: Intersection of Armada Drive and Grand Pacific Resorts. PROJECT DESCRIPTION: Installation of a three-leg, fully actuated traffic signal, including a type 170 controller, 200SA local intersection control program, video detection, battery back-up system, signal interconnect conduit and appurtenant striping and signing. PROJECT NEED: California MUTCD traffic signal warrants have been met. The intersection is listed on the Traffic Signal Qualification List of the City's 2008 Traffic Signal Evaluation Policy. The installation of a traffic signal will assign the right-of-way for both motorists and pedestrians entering and crossing at this intersection. FINANCING: Purpose Estimated Cost Funding Source Design/Environmental $8,000 Gas Tax Construction $182,000 Gas Tax Total Cost = $190,000 AVIATSIG Page 142 CAPITAL PROJECT DESCRIPTION 3369 CIRCULATION SYSTEM TRAFFIC SIGNALS - AVIARA PARKWAY (POINSETTIA LANE TO EL CAMINO REAL) PROJECT NO. PROJECT NAME PROJECT LOCATION MAP: PROJECT LOCATION: At various intersections on Aviara Parkway between Poinsettia Lane and El Camino Real. PROJECT DESCRIPTION: Construct traffic signals and/or make minor drainage improvements to the following intersections with Aviara Parkway: 1. Nightshade Road - Traffic Signal 2. Towhee Lane - Traffic Signal PROJECT NEED: Signals needed to comply with Growth Management Standards. Traffic signals will be installed when they are warranted. Minor street improvements are needed to accommodate street drainage. Improvements will be constructed when Aviara Parkway is extended north of Poinsettia Lane. FINANCING: Purpose Estimated Cost Funding Source Design/Construction $29,969 TIF Design/Construction $160,000 Gas Tax Design/Construction $645,447 Other Total Cost = $834,416 CAPITAL PROJECT DESCRIPTION 6300 CIRCULATION SYSTEM TRAFFIC SIGNALS -AVIARA PARKWAY AND CAMINO DE LAS ONDAS PROJECT NO. PROJECT LOCATION MAP: Aviara_Ondas PROJECT NAME PROJECT LOCATION: Aviara Parkway and Camino de las Ondas. PROJECT DESCRIPTION: Installation of a fully-actuated traffic signal and appurtenant striping and signage. Developer of North Coast Calvary Chapel (MS 04-02) will design and construct signal and may apply for reimbursement of half the cost pursuant to a development condition for the project. PROJECT NEED: Required to provide safe ingress and egress to the Mariner's Point and North Coast Calvary Chapel developments. FINANCING: Purpose Estimated Cost Funding Source Construction (Reimb.) $105,000 Gas Tax Total Cost = $105,000 Page 143 CAPITAL PROJECT DESCRIPTION CIRCULATION SYSTEM TRAFFIC SIGNALS -CALLE BARCELONA AND PASEO AVELLANO PROJECT NAME 6306 PROJECT NO. PROJECT LOCATION MAP: PROJECT LOCATION: SIGNAL ----"\. LOCATION ' CALLE OLIVENHAIN RD. CALLEBARC Intersection of Calle Barcelona and Paseo Avellano. PROJECT DESCRIPTION: Installation of a four-leg, fully actuated traffic signal, including a type 170 controller, 200SA local intersection control program, video detection, battery back-up system, appurtenant signing and striping, and signal interconnect to adjacent controllers. PROJECT NEED: A Caltrans traffic signal warrant has been met. The intersection is listed on the Traffic Signal Qualification List of the City's 2004 Traffic Signal Evaluation Policy. The installation of this traffic signal will assign the right-of-way for both motorists and pedestrians entering and crossing at this intersection. FINANCING: Purpose Design Construction Adm in/Inspection Total Cost= Estimated Cost $8,000 $190,000 $12,000 $210,000 Funding Source GCC GCC GCC Page 144 CAMINODE Page 145 CAPITAL PROJECT DESCRIPTION NONE CIRCULATION SYSTEM TRAFFIC SIGNALS - CAMINO DE LOS COCHES AND LA COSTA AVENUE PROJECT NO. PROJECT NAME PROJECT LOCATION MAP: PROJECT LOCATION: Intersection of Camino de los Coches and La Costa Avenue. PROJECT DESCRIPTION: Installation of a four-leg, fully actuated traffic signal, including a type 170 controller, 200SA local intersection control program, video detection, battery back-up system, appurtenant signing and striping, and signal interconnect to adjacent controllers. PROJECT NEED: Needed to comply with Growth Management Standards. Installation will occur when traffic signal warrants are met. The installation of this traffic signal will assign the right-of-way for both motorists and pedestrians entering and crossing at the intersection. FINANCING: Purpose Estimated Cost Funding Source Design $8,000 Tran’s Net-Loc Construction $170,000 Tran’s Net-Loc Admin/Inspection $12,000 Tran’s Net-Loc Total Cost = $190,000 CAPITAL PROJECT DESCRIPTION CIRCULATION SYSTEM TRAFFIC SIGNALS -CAMINO VIDA ROBLE AND YARROW DRIVE PROJECT NAME NONE PROJECT NO. PROJECT LOCATION MAP: PROJECT LOCATION: PALOMAR CAMI NOYA SIGNAL LOCATION Intersection of Camino Vida Roble and Yarrow Drive. PROJECT DESCRIPTION: Installation of a three-leg, fully actuated traffic signal, including a type 170 controller, 200SA local intersection control program, video detection, battery back-up system, appurtenant signing and striping, and signal interconnect to adjacent controllers. PROJECT NEED: Needed to comply with Growth Management Standards and traffic signal warrants. Installation will occur when traffic signal warrants are met. The installation of this traffic signal will assign the right-of-way for both motorists and pedestrians entering and crossing at the intersection. FINANCING: Purpose Design Construction Admin/1 nspection Total Cost= Estimated Cost Funding Source $8,000 $170,000 $12,000 $190,000 Gas Tax Gas Tax Gas Tax Page 146 CAPITAL PROJECT DESCRIPTION CIRCULATION SYSTEM TRAFFIC SIGNALS -CANNON ROAD AND AVENI DA ENCINAS PROJECT NAME 3902 PROJECT NO. PROJECT LOCATION MAP: PROJECT LOCATION: IRPORT RD. CANNON1 Intersection of Cannon Road and Avenida Encinas, immediately west of Interstate 5. PROJECT DESCRIPTION: Installation of a 5-phase, fully actuated traffic signal, including a Type 170 controller, 176 intersection control program and minor intersection improvements. PROJECT NEED: Needed to comply with Growth Management Standards. Installation will occur when traffic signal warrants are met. FINANCING: Purpose Estimated Cost Funding Source Design/Construction $150,000 PFF Total Cost= $150,000 Page 147 CAPITAL PROJECT DESCRIPTION NONE ·CIRCULATION SYSTEM TRAFFIC SIGNALS -CANNON ROAD AND COLLEGE BOULEVARD PROJECT NO. PROJECT LOCATION MAP: CANNON2 PROJECT NAME PROJECT LOCATION: Intersection of Cannon Road and College Boulevard. PROJECT DESCRIPTION: Installation of a four-leg, fully actuated traffic signal, including a type 170 controller, 200SA local intersection control program, video detection, battery back-up system, appurtenant signing and striping, and signal interconnect to adjacent controllers. PROJECT NEED: Needed to comply with Growth Management Standards. Installation will occur when traffic signal warrants are met. The installation of this traffic signal will assign the right-of-way for both motorists and pedestrians entering and crossing at the intersection. FINANCING: Purpose Design Construction Adm in/Inspection Total Cost= Estimated Cost $8,000 $190,000 $12,000 $210,000 Funding Source Trans Net-Loe Trans Net-Loe Trans Net-Loe Page 148 CAPITAL PROJECT DESCRIPTION CIRCULATION SYSTEM TRAFFIC SIGNALS -CARLSBAD BOULEVARD AND TAMARACK AVENUE SIGNAL REPAIRS PROJECT NAME 6301 PROJECT NO. PROJECT LOCATION MAP: PROJECT LOCATION: Cbad_Tam Carlsbad Boulevard and Tamarack Avenue. PROJECT DESCRIPTION: Remove and replace all traffic signal equipment including signal controller/cabinet, signal poles and mast arms, vehicle and signal indications, conduit and conductors. Existing electrical service cabinet is adequate and does not need to be replaced. Install video detection and UPS battery back-up systems. PROJECT NEED: Due to age of equipment and proximity to ocean, the existing signal equipment is badly corroded and in need of replacement. Underground conduit is corroded and overfilled, making repair/maintenance work difficult. FINANCING: Purpose Design Construction Adm in/Inspection Total Cost= Estimated Cost $5,000 $201,500 $23,500 $230,000 Funding Source IRF IRF IRF Page 149 CBD_CHERRY Page 150 CAPITAL PROJECT DESCRIPTION NONE CIRCULATION SYSTEM TRAFFIC SIGNALS – CARLSBAD BOULEVARD AND CHERRY STREET PROJECT NO. PROJECT NAME PROJECT LOCATION MAP: PROJECT LOCATION: Intersection of Carlsbad Boulevard and Cherry Street. PROJECT DESCRIPTION: Installation of a three-leg, fully actuated traffic signal, including a type 170 controller, 200SA local intersection control program, video detection, battery back-up system, signal interconnect conduit and appurtenant striping and signing. PROJECT NEED: California MUTCD traffic signal warrants have been met. The intersection is listed on the Traffic Signal Qualification List of the City's 2008 Traffic Signal Evaluation Policy. The installation of a traffic signal will assign the right-of-way for both motorists and pedestrians entering and crossing at this intersection. FINANCING: Purpose Estimated Cost Funding Source Design/Environmental $8,000 Gas Tax Construction $182,000 Gas Tax Total Cost = $190,000 PROJECT LOCATION MAP: CAPITAL PROJECT DESCRIPTION CIRCULATION SYSTEM TRAFFIC SIGNALS -EL CAMINO REAL AND CHESTNUT AVENUE SIGNAL REPAIRS PROJECT NAME PROJECT LOCATION: El Camino Real and Chestnut Avenue. PROJECT DESCRIPTION: 6302 PROJECT NO. HWY 78 Remove and replace all traffic signal equipment including signal controller/cabinet, electrical service enclosure, vehicle and signal indications, conduit and conductors. Install video detection and UPS battery back-up systems. Minor sidewalk repairs on northeast (including retaining wall) and southeast corners to provide minimum pedestrian clearance per ADA requirements. Existing poles/mast arms to remain. ECR_Chest PROJECT -~SITE PROJECT NEED: Due to age of equipment, the existing signal equipment is badly corroded and in need of replacement. Underground conduit is corroded and overfilled, making repair/maintenance work difficult and also needs to be replaced. FINANCING: Purpose Design Construction Adm in/Inspection Total Cost= Estimated Cost Funding Source $20,000 IRF $237,500 IRF $18,500 IRF _ $276,000 Page 151 PROJECT LOCATION MAP: ECR_Tam CAPITAL PROJECT DESCRIPTION CIRCULATION SYSTEM TRAFFIC SIGNALS -EL CAMINO REAL AND TAMARACK AVENUE SIGNAL REPAIRS PROJECT NAME PROJECT LOCATION: El Camino Real and Tamarack Avenue. PROJECT DESCRIPTION: 6303 PROJECT NO. Remove and replace all underground conduit, conductors and pull boxes. Install video detection system and UPS battery back-up system. PROJECT NEED: Due to age of equipment, underground conduit is corroded and overfilled, making repairs/maintenance work difficult. Video detection and battery back-up system will be installed to bring signal operations up-to-date. FINANCING: Purpose Design Construction Admin/lnspection Total Cost= Estimated Cost Funding Source $5,000 $177,000 $18,000 $200,000 IRF IRF IRF Page 152 CAPITAL PROJECT DESCRIPTION CIRCULATION SYSTEM TRAFFIC SIGNALS -EL FUERTE AND RANCHO PANCHO PROJECT NAME NONE PROJECT NO. PROJECT LOCATION MAP: PROJECT LOCATION: SIGNAL LOCATION ELFUERTE PANCHO At the intersection of El Fuerte Street and Rancho Pancho. PROJECT DESCRIPTION: Installation of a three-leg, fully actuated traffic signal, including a controller and intersection control program, video detection, battery back-up, signal interconnect conduit, and appurtenant striping and signing. PROJECT NEED: The intersection is listed on the Traffic Signal Qualification List of the City's 2006 Traffic Signal Evaluation Policy. The installation of this traffic signal will assign the right-of-way for both motorists and pedestrians. FINANCING: Purpose Design Construction Inspection Total Cost= Estimated Cost $8,000 $171,000 $11,000 $190,000 Funding Source Gas Tax Gas Tax Gas Tax Page 153 CAPITAL PROJECT DESCRIPTION CIRCULATION SYSTEM TRAFFIC SIGNALS -FARADAY AVENUE AND CAMINO HILLS DRIVE PROJECT NAME NONE PROJECT NO. PROJECT LOCATION MAP: PROJECT LOCATION: AIRPORT Faraday Intersection of Faraday Avenue and Camino Hills Drive. PROJECT DESCRIPTION: Installation of a three-leg, fully actuated traffic signal, including a type 170 controller, 200SA local intersection control program, video detection, battery back-up system, appurtenant signing and striping, and signal interconnect to adjacent controllers. PROJECT NEED: A Caltrans traffic signal warrant has been met. The intersection is listed on the Traffic Signal Qualification List of the City's 2004 Traffic Signal Evaluation Policy. The installation of this traffic signal will assign the right-of-way for both motorists and pedestrians entering and crossing at this intersection. FINANCING: Purpose Design Construction Admin/1 nspection Total Cost= Estimated Cost $8,000 $170,000 $12,000 $190,000 Funding Source Gas Tax Gas Tax Gas Tax Page 154 FAR_PALM Page 155 CAPITAL PROJECT DESCRIPTION NONE CIRCULATION SYSTEM TRAFFIC SIGNALS – FARADAY AVENUE AND PALMER WAY PROJECT NO. PROJECT NAME PROJECT LOCATION MAP: PROJECT LOCATION: Intersection of Faraday Avenue and Palmer Way. PROJECT DESCRIPTION: Installation of a three-leg, fully actuated traffic signal, including a type 170 controller, 200SA local intersection control program, video detection, battery back-up system, signal interconnect conduit and appurtenant striping and signing. PROJECT NEED: California MUTCD traffic signal warrants have been met. The intersection is listed on the Traffic Signal Qualification List of the City's 2008 Traffic Signal Evaluation Policy. The installation of a traffic signal will assign the right-of-way for both motorists and pedestrians entering and crossing at this intersection. FINANCING: Purpose Estimated Cost Funding Source Design/Environmental $8,000 Gas Tax Construction $182,000 Gas Tax Total Cost = $190,000 CAPITAL PROJECT DESCRIPTION CIRCULATION SYSTEM TRAFFIC SIGNALS -FARADAY AVENUE AND RUTHERFORD ROAD PROJECT NAME 63121 PROJECT NO. PROJECT LOCATION MAP: PROJECT LOCATION: Faruthfd At the intersection of Faraday Avenue and Rutherford Road. PROJECT DESCRIPTION: Installation of a four-leg, fully actuated traffic signal, including a type 170 controller, 200SA local intersection control program, video detection, battery back-up system, appurtenant signing and striping, and signal interconnect to adjacent controllers. PROJECT NEED: Caltrans traffic signal warrants have been met. The intersection is listed on the qualification list of the City's Traffic Signal Evaluation Policy. The installation of this traffic signal will assign the right-of-way for both motorists and pedestrians entering and crossing at the intersection. FINANCING: Purpose Design Construction Admin/1 nspection Total Cost= Estimated Cost Funding Source $8,000 $170,000 $12,000 $190,000 Gas Tax Gas Tax Gas Tax Page 156 LACOSTA_3 Page 157 CAPITAL PROJECT DESCRIPTION NONE CIRCULATION SYSTEM TRAFFIC SIGNALS – LA COSTA AVENUE AND CALLE MADERO PROJECT NO. PROJECT NAME PROJECT LOCATION MAP: PROJECT LOCATION: Intersection of La Costa Avenue and Calle Madero. PROJECT DESCRIPTION: Installation of a three-leg, fully actuated traffic signal, including a type 170 controller, 200SA local intersection control program, video detection, battery back-up system, signal interconnect conduit and appurtenant striping and signing. PROJECT NEED: California MUTCD traffic signal warrants have been met. The intersection is listed on the Traffic Signal Qualification List of the City's 2008 Traffic Signal Evaluation Policy. The installation of a traffic signal will assign the right-of-way for both motorists and pedestrians entering and crossing at this intersection. FINANCING: Purpose Estimated Cost Funding Source Design/Environmental $8,000 Gas Tax Construction $190,000 Gas Tax Admin/Inspection $12,000 Gas Tax Total Cost = $210,000 CAPITAL PROJECT DESCRIPTION CIRCULATION SYSTEM TRAFFIC SIGNALS -LA COSTA AVENUE AND ESFERA STREET PROJECT NAME NONE PROJECT NO. PROJECT LOCATION MAP: PROJECT LOCATION: La_costa La Costa Avenue and Esfera Street. PROJECT DESCRIPTION: Installation of a three-leg, fully actuated traffic signal, including a type 170 controller, 200SA local intersection control program, video detection, battery back-up system, appurtenant signing and striping, and signal interconnect to adjacent controllers. PROJECT NEED: The installation of this traffic signal will assign the right-of-way for both motorists and pedestrians entering and crossing at the intersection. FINANCING: Purpose Design Construction Adm in/Inspection Total Cost= Estimated Cost $8,000 $190,000 $12,000 $210,000 Funding Source Gas Tax Gas Tax Gas Tax Page 158 LACOSTA_4 Page 159 CAPITAL PROJECT DESCRIPTION NONE CIRCULATION SYSTEM TRAFFIC SIGNALS – LA COSTA AVENUE AND GIBRALTAR STREET PROJECT NO. PROJECT NAME PROJECT LOCATION MAP: PROJECT LOCATION: Intersection of La Costa Avenue and Gibraltar Street. PROJECT DESCRIPTION: Installation of a three-leg, fully actuated traffic signal, including a type 170 controller, 200SA local intersection control program, video detection, battery back-up system, signal interconnect conduit and appurtenant striping and signing. PROJECT NEED: California MUTCD traffic signal warrants have been met. The intersection is listed on the Traffic Signal Qualification List of the City's 2008 Traffic Signal Evaluation Policy. The installation of a traffic signal will assign the right-of-way for both motorists and pedestrians entering and crossing at this intersection. FINANCING: Purpose Estimated Cost Funding Source Design/Environmental $8,000 Gas Tax Construction $190,000 Gas Tax Admin/Inspection $12,000 Gas Tax Total Cost = $210,000 CAPITAL PROJECT DESCRIPTION CIRCULATION SYSTEM TRAFFIC SIGNALS -LA COSTA AVENUE AND LEVANTE STREET PROJECT NAME 3938 PROJECT NO. PROJECT LOCATION MAP: PROJECT LOCATION: Lacosta_2 La Costa Avenue and Levante Street. PROJECT DESCRIPTION: Installation of a three-leg, fully actuated traffic signal, including a type 170 controller, 200SA local intersection control program, video detection, battery back-up system, appurtenant signing and striping, and signal interconnect to adjacent controllers. PROJECT NEED: The installation of this traffic signal will assign the right-of-way for both motorists and pedestrians entering and crossing at the intersection. FINANCING: Purpose Design Construction Adm in/Inspection Total Cost= Estimated Cost $8,000 $180,000 $22,000 $210,000 Funding Source Trans Net-Loe Trans Net-Loe Trans Net-Loe Page 160 CAPITAL PROJECT DESCRIPTION CIRCULATION SYSTEM TRAFFIC SIGNALS -LA COSTA AVENUE AND NU EVA CASTILLA WAY PROJECT NAME NONE PROJECT NO. PROJECT LOCATION MAP: PROJECT LOCATION: LCANueva Intersection of La Costa Avenue and Nueva Castilla Way. PROJECT DESCRIPTION: Installation of a four-leg, fully actuated traffic signal, including a type 170 controller, 200SA local intersection control program, video detection, battery back-up system, appurtenant signing and striping, and signal interconnect to adjacent controllers. PROJECT NEED: Caltrans traffic signal warrants have been met. The intersection is listed on the qualification list of the City's Traffic Signal Evaluation Policy. The installation of this traffic signal will assign the right-of-way for both motorists and pedestrians entering and crossing at the intersection. FINANCING: Purpose Design Construction Adm in/Inspection Total Cost= Estimated Cost $8,000 $190,000 $12,000 $210,000 Funding Source Gas Tax Gas Tax Gas Tax Page 161 CAPITAL PROJECT DESCRIPTION CIRCULATION SYSTEM TRAFFIC SIGNALS -MONROE STREET AND HOSP WAY PROJECT NAME NONE PROJECT NO. PROJECT LOCATION MAP: PROJECT LOCATION: SIGNAL LOCATION Monroe HWY 78 Intersection of Monroe Street and Hosp Way. PROJECT DESCRIPTION: Installation of a four-leg, fully actuated traffic signal, including a type 170 controller, 200SA local intersection control program, video detection, battery back-up system, appurtenant signing and striping, and signal interconnect to adjacent controllers. PROJECT NEED: A Caltrans traffic signal warrant has been met. The intersection is listed on the Traffic Signal Qualification List of the City's 2004 Traffic Signal Evaluation Policy. The installation of this traffic signal will assign the right-of-way for both motorists and pedestrians entering and crossing at this intersection. FINANCING: Purpose Design Construction Adm in/Inspection Total Cost= Estimated Cost $8,000 $190,000 $12,000 $210,000 Funding Source Trans Net-Loe Trans Net-Loe Trans Net-Loe Page 162 PASEO_HARBOR Page 163 CAPITAL PROJECT DESCRIPTION NONE CIRCULATION SYSTEM TRAFFIC SIGNALS – PASEO DEL NORTE AND HARBOR POINT ROAD PROJECT NO. PROJECT NAME PROJECT LOCATION MAP: PROJECT LOCATION: Intersection of Paseo del Norte and Harbor Point Road. PROJECT DESCRIPTION: Installation of a four-leg, fully actuated traffic signal, including a type 170 controller, 200SA local intersection control program, video detection, battery back-up system, signal interconnect conduit and appurtenant striping and signing. PROJECT NEED: California MUTCD traffic signal warrants have been met. The intersection is listed on the Traffic Signal Qualification List of the City's 2008 Traffic Signal Evaluation Policy. The installation of a traffic signal will assign the right-of-way for both motorists and pedestrians entering and crossing at this intersection. FINANCING: Purpose Estimated Cost Funding Source Design/Environmental $8,000 Gas Tax Construction $202,000 Gas Tax Total Cost = $210,000 CAPITAL PROJECT DESCRIPTION CIRCULATION SYSTEM TRAFFIC SIGNALS -POINSETTIA LANE AND BRIGANTINE ROAD PROJECT NAME NONE PROJECT NO. ------------------------------~----------------------... ·------------------------------------------------------· PROJECT LOCATION MAP: ! Poin_brig PROJECT LOCATION: Intersection of Poinsettia Lane and Brigantine Road. PROJECT DESCRIPTION: Installation of a three-leg, fully actuated traffic signal, including a type 170 controller, 200SA local intersection control program, video detection, battery back-up system, appurtenant signing and striping, and signal interconnect to adjacent controllers. PROJECT NEED: Required to accommodate the safe and efficient flow of traffic from Brigantine Drive onto Poinsettia Lane which is classified as a major arterial in the City's Circulation Element. The need for the signal is created by the development of adjacent properties. Early developing properties which do not trigger the construction of the signal are required to contribute a fair share contribution of the total cost to install the traffic signal. FINANCING: Purpose Estimated Cost Funding Source Design $8,000 Gas Tax Construction $170,000 Gas Tax Adm in/Inspection $12,000 Gas Tax Total Cost= $190,000 Page 164 CAPITAL PROJECT DESCRIPTION CIRCULATION SYSTEM TRAFFIC SIGNALS -RANCHO SANTA FE ROAD AND AVENIDA LA CIMA PROJECT NAME 6307 PROJECT NO. PROJECT LOCATION MAP: PROJECT LOCATION: RSF_LACIMA At the intersection of Rancho Santa Fe Road and Avenida La Cima. PROJECT DESCRIPTION: Installation of a three-leg, fully actuated traffic signal, including a type 170 controller, 200 SA local intersection control program, video detection, battery backup, signal interconnect conduit and appurtenant striping and signing. PROJECT NEED: California MUTCD traffic signal warrants have been met. The intersection is listed on the Traffic Signal Qualification List of the City's 2006 Traffic Signal Evaluation Policy. The installation of this traffic signal will assign right-of-way for both motorists and pedestrians entering and crossing at this intersection. FINANCING: Purpose Design Construction Total Cost= Estimated Cost $8,000 $182,000 $190,000 Funding Source GCC GCC Page 165 RSFMELRO Page 166 CAPITAL PROJECT DESCRIPTION NONE CIRCULATION SYSTEM TRAFFIC SIGNALS - RANCHO SANTA FE ROAD AND CALLE JUNIPERO (FORMERLY MELROSE DRIVE SOUTH) PROJECT NO. PROJECT NAME PROJECT LOCATION MAP: PROJECT LOCATION: Intersection of Rancho Santa Fe Road and future Calle Junipero, formerly Melrose Drive South. PROJECT DESCRIPTION: Installation of a three-leg, fully actuated traffic signal, including a type 170 controller, 200SA local intersection control program, video detection, battery back-up system, appurtenant signing and striping, and signal interconnect to adjacent controllers. PROJECT NEED: Needed to comply with Growth Management Standards. The installation of this traffic signal will assign the right-of-way for both motorists and pedestrians entering and crossing at the intersection. FINANCING: Purpose Estimated Cost Funding Source Design $8,000 Gas Tax Construction $190,000 Gas Tax Admin/Inspection $12,000 Gas Tax Total Cost = $210,000 CAPITAL PROJECT DESCRIPTION CIRCULATION SYSTEM TRAFFIC SIGNALS -RANCHO SANTA FE ROAD AND SAN ELIJO ROAD (FORMERLY QUESTHAVEN ROAD) PROJECT NAME 3406 PROJECT NO. PROJECT LOCATION MAP: PROJECT LOCATION: RSFQUEST SIGNAL LOCATION Intersection of Rancho Santa Fe Road and San Elijo Road, formerly Questhaven Road. PROJECT DESCRIPTION: Installation of a three-leg, fully actuated traffic signal, including a type 170 controller, 200SA local intersection control program, video detection, battery back-up system, appurtenant signing and striping, and signal interconnect to adjacent controllers. The City of San Marcos is responsible for 1 /3 share of this signal. Staff will pursue a cost sharing agreement with the City of San Marcos. PROJECT NEED: Needed to comply with Growth Management Standards. The installation of this traffic signal will assign the right-of-way for both motorists and pedestrians entering and crossing at the intersection. FINANCING: Purpose Estimated Cost Funding Source Construction $124,767 Gas Tax Total Cost= $124,767 Page 167 CAPITAL PROJECT DESCRIPTION CIRCULATION SYSTEM TRAFFIC SIGNALS -TAMARACK AVENUE ANO PONTIAC DRIVE PROJECT NAME 3940 PROJECT NO. PROJECT LOCATION MAP: PROJECT LOCATION: Tam&pont Intersection of Tamarack Avenue and Pontiac Drive. PROJECT DESCRIPTION: Installation of a three-leg, fully actuated traffic signal, including a type 170 controller, 200SA local intersection control program, video detection, battery back-up system, appurtenant signing and striping, and signal interconnect to adjacent controllers. PROJECT NEED: A Caltrans traffic signal warrant has been met. The intersection is listed on the Traffic Signal Qualification List of the City's 2004 Traffic Signal Evaluation Policy. The installation of this traffic signal will assign the right-of-way for both motorists and pedestrians entering and crossing at this intersection. FINANCING: Purpose Design Construction Ad min/Inspection Total Cost= Estimated Cost $8,000 $180,000 $22,000 $210,000 Annual Operating Cost= $5,000 Funding Source Gas Tax Gas Tax Gas Tax Page 168 CAPITAL PROJECT DESCRIPTION CIRCULATION SYSTEM TRAFFIC SIGNALS -TAMARACK AVENUE ANO VALLEY STREET PROJECT NAME NONE PROJECT NO. PROJECT LOCATION MAP: PROJECT LOCATION: Tam_vall Intersection of Tamarack Avenue and Valley Street. PROJECT DESCRIPTION: Installation of a four-leg, fully actuated traffic signal, including a type 170 controller, 200SA local intersection control program, video detection, battery back-up system, appurtenant signing and striping, and signal interconnect to adjacent controllers. PROJECT NEED: A Caltrans traffic signal warrant has been met. The intersection is listed on the Traffic Signal Qualification List of the City's 2004 Traffic Signal Evaluation Policy. The installation of this traffic signal will assign the right-of-way for both motorists and pedestrians entering and crossing at this intersection. This is an elementary school pedestrian crossing. FINANCING: Purpose Design Construction Ad min/Inspection Total Cost= Estimated Cost $8,000 $170,000 $12,000 $190,000 Funding Source Gas Tax Gas Tax Gas Tax Page 169 CAPITAL PROJECT DESCRIPTION CIRCULATION SYSTEM TRAFFIC SIGNALS -VIDEO DETECTION CONVERSION PROJECT NAME 6305 PROJECT NO. PROJECT LOCATION MAP: PROJECT LOCATION: NIA VIDEODET Citywide. PROJECT DESCRIPTION: Convert existing traffic signal with video detection equipment along streets included in the Pavement Management Program projects. PROJECT NEED: Traffic signals are being converted to Video Detection to minimize impacts during future construction projects and to eliminate the cost associated with future loop replacements. FINANCING: Purpose Estimated Cost Funding Source Construction $1,850,000 Gas Tax Total Cost= $1,850,000 Page 170 STREET PROJECTS FUNDING MATRIX FOR STREET PROJECTS FUTURE YEAR BUDGET AMOUNTS PROJ FUND FUNDING TOTAL PRIOR YEAR1 YEAR2 YEAR3 YEAR4 YEARS YEAR 6-10 BUILDOUT NO. NO. PROJECT TITLE SOURCE BUDGET APPROP. 2009-2010 2010-2011 2011-2012 2012-2013 2013-2014 2014-2019 2019-2024 6004 60041 AVENIDA ENCINAS WIDENING-SOUTH OF PALOMAR AIRPORT ROAD TIF 5,402,000 225,000 421,000 2,365,000 30,000 2,361,000 CAMINO HILLS AND JACKSPAR SLOPE STABILIZATION GCC 87,000 0 87,000 3814 38141 CANNON ROAD REACH 4 TRANSNET-HWY 1,761,000 1,761,000 6014 60142 CARLSBAD BLVD BRIDGE CONCRETE BARRIER POWER PLANT FEDGRNT 1,217,287 8,853 1,208,434 6014 60143 CARLSBAD BLVD BRIDGE CONCRETE BARRIER POWER PLANT TRANSNET-LOC 157,713 3,147 154,566 6016 60162 CARLSBAD BLVD BRIDGE CONCRETE BARRIER RAILROAD FEDGRNT 340,840 13,280 327,560 6016 60163 CARLSBAD BLVD BRIDGE CONCRETE BARRIER RAILROAD TRANSNET-LOC 44,160 0 44,160 6000 60001 CARLSBAD BLVD. AT STATE ST-INTERSECTION ENHANCEMENT DESIGN REDVL VILLAGE 100,000 100,000 CARLSBAD BLVD. REALIGNMENT STUDY, PHASE 2 REDVL SCCRDA 250,000 0 250,000 CARLSBAD BOULEVARD I PALOMAR AIRPORT ROAD TIF 740,896 0 740,896 CARLSBAD BOULEVARD I PALOMAR AIRPORT ROAD TIF(RTCIP) 2,927,600 0 2,927,600 CARLSBAD BOULEVARD MEDIAN-TAMARACK AVENUE TO PINE AVENUE GAS TAX 2,197,000 0 2,197,000 CARLSBAD BOULEVARD MOUNTAIN VIEW TO NORTHERLY CITY LIMITS TIF 782,496 0 782,496 CARLSBAD BOULEVARD MOUNTAIN VIEW TO NORTHERLY CITY LIMITS TIF(RTCIP) 1,012,960 0 1,012,960 3557 35571 CARLSBAD BOULEVARD RETROFIT OVER SDNR TRANSNET-LOC 1,734,000 1,734,000 CARLSBAD BOULEVARD WIDENING -CANNON TO MANZANO TIF 5,574,400 0 5,574,400 CARLSBAD VILLAGE DRIVE -PONTIAC TO VICTORIA TIF 2,466,880 0 2,466,880 6017 60171 CARLSBAD VILLAGE DRIVE AND AVENIDA DE ANITA GCC 105,000 105,000 3636 36362 COLLEGE BLVD REACH AAND CANNON REACH 4A OTHER 1,713,002 1,713,002 3879 38791 COLLEGE/CANNON ASSESSMENT DISTRICT OTHER 10,314,481 10,314,481 6013 60131 CONCRETE REPAIR PROGRAM GCC 250,000 250,000 6013 60132 CONCRETE REPAIR PROGRAM GAS TAX 1,500,000 500,000 250,000 250000 250000 250000 6021 60211 CONCRETE REPAIR WORK GAS TAX 750,000 550,000 100,000 100,000 EL CAMINO REAL I CANNON ROAD INTERSECTION IMPROVEMENTS TIF 589,000 0 589,000 EL CAMINO REAL AND CARLSBAD VILLAGE DRIVE DUAL LEFT TURNS TIF 899,600 0 899,600 EL CAMINO REAL LEFT TURN LANE TO WEST TAMARACK TIF 286,000 0 286,000 3643 36431 EL CAMINO REAL MEDIANS PFF 909,500 909,500 3643 36431 EL CAMINO REAL MEDIANS GAS TAX 2,866,600 0 1,135,000 1,731,600 3909 39091 EL CAMINO REAL MEDIANS -LA COSTA PFF 1,390,500 0 90,500 1,300,000 EL CAMINO REAL RIGHT TURN LANE TO NORTH ALGA ROAD TIF 348,400 0 348,400 EL CAMINO REAL WIDENING -CASSIA RD TO CAMINO VIDA ROBLE TRANSNET-LOC 4,026,000 0 4,026,000 EL CAMINO REAL WIDENING -ARENAL ROAD TO LA COSTA AVENEUE TIF 1,772,160 0 1,772,160 EL CAMINO REAL WIDENING -ARENAL ROAD TO LA COSTA AVENEUE TIF(RTCIP) 625,040 0 625,040 EL CAMINO REAL WIDENING -LISA STREET TO CRESTVIEW DR TRANSNET-LOC 1,202,000 0 1,202,000 3920 39201 EL CAMINO REAL WIDENING -NORTH OF COUGAR DRIVE TRANSNET-LOC 574,782 557,282 17,500 3929 39291 EL CAMINO REAL WIDENING -TAMARACK TO CHESTNUT TRANSNET-LOC 3,925,885 0 3,925,885 3929 39291 EL CAMINO REAL WIDENING-TAMARACK TO CHESTNUT TRANSNET-STP 345,000 0 345,000 3957 39571 EL CAMINO REAL WIDENING -TAMARACK TO CHESTNUT TIF 7,656,023 7,656,023 EL CAMINO REAL WIDENING-TAMARACK TO CHESTNUT TIF(RTCIP) 422,000 0 422,000 Page 171 FUNDING MATRIX FOR STREET PROJECTS {Continued) FUTURE YEAR BUDGET AMOUNTS PROJ FUND FUNDING TOTAL PRIOR YEAR 1 YEAR2 YEAR3 YEAR4 YEARS YEAR 6-10 BUILDOUT NO. NO. PROJECT TITLE SOURCE BUDGET AP PROP. 2009-2010 2010-2011 2011-2012 2012-2013 2013-2014 2014-2019 2019-2024 6009 60091 EL FUERTE EXTENSION OTHER 4,095,146 4,095,146 1-5 AND LA COSTA AVENUE AUXILLARY LANES CFD#1 2,000,000 0 2,000,000 6024 60241 LA COSTA AVE SLOPE REPAIR WEST OF ROMERIA GAS TAX 199,000 183,500 15,500 6020 60201 MARSELLA WALL BEAUTIFICATION GCC 180,000 160,000 20,000 MELROSE DRIVE AND ALGA ROAD DUAL LEFT TURN LANES TIF(RTCIP) 983,840 0 983,840 MELROSE DRIVE TURN LANE TO WEST PALOMAR AIRPORT ROAD TIF 410,000 0 410,000 PALOMAR AIRPORT ROAD AND COLLEGE BLVD RIGHT TURN LANES TIF 587,000 0 587,000 PALOMAR AIRPORT ROAD AND COLLEGE BLVD DRAINAGE GCC 250,500 0 250,500 6012 60121 PALOMAR AIRPORT ROAD AND MELROSE DRIVE RIGHT TURN OTHER 165,980 165,980 6012 60123 PALOMAR AIRPORT ROAD AND MELROSE DRIVE RIGHT TURN TIF 88,500 88,500 PALOMAR AIRPORT ROAD LEFT TURN LANE TO N/8 PASEO DEL NORTE GAS TAX 169,943 0 169,943 PALOMAR AIRPORT ROAD LEFT TURN LANE TO N/8 PASEO DEL NORTE OTHER 25,394 0 25,394 PALOMAR AIRPORT ROAD RIGHT TURN LANE TO S/B PASEO DEL NORTE GAS TAX 424,286 0 424,286 PALOMAR AIRPORT ROAD RIGHT TURN LANE TO S/B PASEO DEL NORTE OTHER 112,785 0 112,785 PALOMAR AIRPORT ROAD TURN LANE TO NORTH EL FUERTE STREET TIF 952,640 0 952,640 PALOMAR AIRPORT ROAD TURN LANE TO SOUTH EL CAMINO REAL TIF 590,720 0 590,720 3811 38111 PALOMAR AIRPORT ROAD WIDENING AT PASEO DEL NORTE TIF 1,676,019 1,676,019 PARK DRIVE, MARINA TO COVE GAS TAX 416,300 0 416,300 6001 60011 PAVEMENT MANAGEMENT PROGRAM TRANSNET-LOC 51,010,515 25,890,452 1,235,063 1,940,000 1,980,000 2,030,000 9,510,000 8,425,000 6001 60012 PAVEMENT MANAGEMENT PROGRAM GAS TAX 7,994,088 7,994,088 6001 60013 PAVEMENT MANAGEMENT PROGRAM (NON-JURIS FEES) TRANSNET-LOC 12,267,476 2,267,476 650,000 660,000 680,000 700,000 3,620,000 3,690,000 PAVEMENT MANAGEMENT PROGRAM (PROP 18 Funds) STATE TRANS 3,167,193 0 1,629,937 1,537,256 PAVEMENT MANAGEMENT PROGRAM (PROP 42 Funds) STATE TRANS 20,030,000 800,000 985,000 1,080,000 1,100,000 1,140,000 1,170,000 6,370,000 7,385,000 3922 39221 POINSETTIA LANE -REACH E BTD#2 13,460,600 350,000 1,600,000 11,510,600 POINSETTIA LANE-REACHES A,B,C,F,G & AVIARA PKWY REIMB BTD#2 1,373,558 0 1,373,558 3689 36892 POINSETTIA LANE EAST OF EL CAMINO REAL FINANCING PROGRAM OTHER 28,932,793 28,932,793 POINSETTIA LANE WIDENING-PASEO DEL NORTE TO BATIQUITOS TIF(RTCIP) 825,760 0 825,760 3860 38601 RANCHO SANTA FE ROAD AND OLIVENHAIN IMPROVEMENTS RSFROAD 5,985,905 5,985,905 3971 39071 RANCHO SANT A FE ROAD NORTH -PHASE II (BRIDGE) RSFROAD 20,671,000 20,671,000 6019 60191 SIDEWALK/STREET CONSTRUCTION -VALLEY AND MAGNOLIA TIF 935,000 630,000 305,000 6002 60021 SIDEWALK/STREET CONSTRUCTION -VARIOUS LOCATIONS TIF 3,295,672 1,495,672 300,000 300,000 300,000 180,000 720,000 6018 60181 TAMARACK AND ADAMS GAS TAX 48,500 48,500 6026 60261 TRAFFIC CALMING -DONNA DRIVE (DESIGN) GAS TAX 113,000 113,000 6027 60271 TRAFFIC CALMING -SIERRA MORENA AVENUE (DESIGN) GAS TAX 90,000 90,000 6003 60031 TRAFFIC MONITORING PROGRAM TIF 1,718,900 374,900 96,000 96,000 96,000 96,000 480,000 480,000 3895 38951 UNDERGROUND DIST. 17-HARDING, ROOSEVELT GCC 509,800 509,800 Page 172 CAPITAL PROJECT DESCRIPTION CIRCULATION SYSTEM STREET PROJECTS -AVENIDA ENCINAS WIDENING SOUTH OF PALOMAR AIRPORT ROAD PROJECT NAME 6004 PROJECT NO. PROJECT LOCATION MAP: PROJECT LOCATION: AVENI DA.doc Along the west side of Avenida Encinas south of Palomar Airport Road adjacent to the San Diego Northern Railway property. PROJECT DESCRIPTION: Widen the west side of Avenida Encinas to full secondary arterial standards from Palomar Airport Road to approximately 800 feet south. The work includes placement of fill material and construction of new curbs, gutters, aggregate base, asphalt paving and striping. PROJECT NEED: Required to comply with Growth Management Standards. FINANCING: Purpose Estimated Cost Funding Source Design/Construction $5,402,000 TIF Total Cost= $5,402,000 Page 173 CAMINOHILL_JACKSPAR CAPITAL PROJ DESCRIPTI N NONE PROJECT NO. JACKSPAR DRIVE SLOPE STABALIZATION PROJECT NAME The project is located on Camino Hills Drive on the sloped area north of the Camino Hills Mobile Home subdivision near the intersection of Jackspar Drive. PROJECT DESCRIPTION: The project is located on a landslide prone site. A buttress system was constructed during the earthwork for the mobile home subdivision to help stabilize the slope. However, there is gradual movement of the slope that is damaging the adjacent street. The project will consist of geotechnical investigations, development of alternative approaches to a solution, and the preparation of design plans. The construction costs for the recommended solution will be presented and considered in a future Capital Improvement Program cycle. It is anticipated the slope stability improvement will consist of installing vertical shear pins (steel I-beams) to prevent failure of the shear plane. The shear pins will be spaced approximately 6 feet apart and will be located below grade. The project is needed to prevent a landslide that could potentially damage the city's infrastructure. Study Design Total Cost= Estimated Cost $25,000 $62,000 $87,000 GCC GCC Page 174 PROJECT LOCATION MAP: Cannon34 CAPITAL PROJECT DESCRIPTION 3814 CIRCULATION SYSTEM STREET PROJECTS -CANNON ROAD REACH 4 COLLEGE BOULEVARD TO OCEANSIDE PROJECT NO. 1 ··- -_.I REACH 4B PROJECT NAME PROJECT LOCATION: Along Cannon Road from future College Boulevard to the Carlsbad/Oceanside city limits. PROJECT DESCRIPTION: Preliminary design of Reach 4 of Cannon Road to full major arterial standards, including all required environmental mitigation costs. PROJECT NEED: Required pursuant to the City Circulation Element. Since the project passes through the existing coastal sage habitat preserve area, it is not included as a financing requirement of any of the local facilities management plans. FINANCING: Purpose Preliminary Design Design/Construction Total Cost= Estimated Cost $1,761,000 $27,000,000 $28,761,000 Funding Source TransNet Hwy Unfunded Page 175 CAPITAL PROJECT DESCRIPTION CIRCULATION SYSTEM STREET PROJECTS -CARLSBAD BOULEVARD BRIDGE OVER POWER PLANT DISCHARGE CHANNEL PROJECT NAME 6014 PROJECT NO. PROJECT LOCATION MAP: PROJECT LOCATION: CBPWRPLNT AGUA HEDIONDA LAGOON Carlsbad Boulevard north of Cannon Road over the power plant outlet channel. PROJECT DESCRIPTION: Installation of a concrete barrier on the existing bridge, provide a decorative fence to screen the existing power plant, and provide any needed repair of the bridge deck. Project may require relocation of a 12-inch water line, 4-inch HP gas line, and telephone conduit. PROJECT NEED: The existing bridge does not have a protective barrier protecting motorists in accordance with Caltrans standards. The edges of the existing bridge have extensive concrete flaking with exposed rebar. FINANCING: Purpose Design/Construction Design/Construction Total Cost*= Estimated Cost $1,217,287 $157,713 $1,375,000 Funding Source Fed Grant TransNet-Loc * 88.57% Fed Grant + 11.43% Local Match Page 176 CAPITAL PROJECT DESCRIPTION CIRCULATION SYSTEM STREET PROJECTS -CARLSBAD BOULEVARD BRIDGE OVER RAILROAD CONCRETE BARRIER PROJECT NAME 6016 PROJECT NO. PROJECT LOCATION MAP: PROJECT LOCATION: CITY OF CITY CSBADBLVD ~Cl 8 ~ BUENA ~ ~ VISTA ~ oZ LAGOON u~ ou Carlsbad Boulevard over the railroad tracks at State Street. PROJECT DESCRIPTION: Replace the existing decorative concrete barrier in accordance with Caltrans requirements. PROJECT NEED: The existing concrete barrier is in poor condition with concrete flaking, cracking and exposed rebar. FINANCING: Purpose Estimated Cost Design/Construction $44, 160 Design/Construction $340,840 Total Cost* = $385,000 Funding Source TransNet-Loc Fed Grant * 88.53% Fed Grant + 11.43% Local Match Page 177 CAPITAL PROJECT DESCRIPTION CIRCULATION SYSTEM STREET PROJECTS -CARLSBAD BOULEVARD AND STATE STREET PEDESTRIAN AND INTERSECTION ENHANCEMENT DESIGN PROJECT NAME 6000 PROJECT NO. PROJECT LOCATION MAP: PROJECT LOCATION: Cbad_State Carlsbad Boulevard from north city limits to State Street. PROJECT DESCRIPTION: The project involves the study and design of a pedestrian walkway on the eastern side of Carlsbad Boulevard from State Street to the northern City limits. The feasibility study will review pedestrian/bicycle/vehicle access and safety issues along Carlsbad Boulevard, identify potential safety improvements, determine the scope of the environmental and operational impacts, and develop planning level cost estimates for the various options identified in the study. The project may also include intersection modifications at Carlsbad Boulevard and State Street to incorporate a traffic signal or stop control to assign right-of-way. The project will then complete design plans for the appropriate enhancements/improvements. PROJECT NEED: A pedestrian walkway is needed to provide separation between pedestrians and vehicles/bicycles traveling between Carlsbad and Oceanside along Carlsbad Boulevard. Modification of the Carlsbad Boulevard/State Street intersection and installation of traffic control devices will facilitate right-of-way assignment. FINANCING: Purpose Study/Report* Design Total Cost= *Complete Estimated Cost $105,000 $100,000 $205,000 Funding Source Redvl SCCRDA Redvl SCCRDA Page 178 CBBLVD_REALIG Page 179 CAPITAL PROJECT DESCRIPTION NONE CIRCULATION SYSTEM STREET PROJECTS – CARLSBAD BLVD REALIGNMENT STUDY PHASE 2 PROJECT NO. PROJECT NAME PROJECT LOCATION MAP: PROJECT LOCATION: Carlsbad Boulevard between Manzano Drive and La Costa Avenue. PROJECT DESCRIPTION: Conduct an investigative study of future roadway realignment alternatives, infrastructure needs, land uses, commercial land development options, public park and coastal access opportunities, and related long term coastal planning issues, constraints, and processes will be analyzed. The second phase study of a multi-year project such as this would not require permits or environmental review at this time. PROJECT NEED: An initial feasibility/realignment study was completed in 2000. The next phase of this project will prepare a study to analyze more detailed alternatives and create options and cost estimates for the realignment of Carlsbad Blvd from Manzano Drive to La Costa Avenue. FINANCING: Purpose Estimated Cost Funding Source Study $200,000 GCC Administration $50,000 GCC Total Cost = $250,000 CAPITAL PROJECT DESCRIPTION NONE CIRCULATION SYSTEM STREET PROJECTS -CARLSBAD BLVD and PALOMAR AIRPORT ROAD WIDENING AND BRIDGE RECONSTRUCTION PROJECT NO. PROJECT LOCATION MAP: PROJECT CBAD-PARBRIDG PROJECT NAME RD. PROJECT LOCATION: On Palomar Airport Road between Carlsbad Boulevard and 1-5 over the San Diego Northern Railway. PROJECT DESCRIPTION: Reconstruct old interchange and connect Palomar Airport Road to Carlsbad Boulevard with a standard signalized tee intersection. Construct four lanes of asphalt pavement on Palomar Airport Road (600 feet) and Carlsbad Boulevard (1,000 feet) including curb and gutter, medians, sidewalk, streetlights, traffic signal and new bridge over railroad. PROJECT NEED: Required to meet Growth Management Standards. Project will improve the capacity of the intersection and free two parcels of land which the City can lease or develop. FINANCING: Purpose Studies/Environmental Design/Permitting Construction Total Cost= Estimated Cost Funding Source $740,896 $2,927,600 $14,109,600 $17,778,096 TIF TIF (RTCIP) Unfunded Page 180 CAPITAL PROJECT DESCRIPTION CIRCULATION SYSTEM STREET PROJECTS -CARLSBAD BOULEVARD MEDIAN TAMARACK AVENUE TO PINE AVENUE PROJECT NAME 3444 PROJECT NO. PROJECT LOCATION MAP: PROJECT LOCATION: PACIFIC OCEAN CBMEDIAN Carlsbad Boulevard from Tamarack Avenue to Pine Avenue. PROJECT DESCRIPTION: Construct raised, landscaped median. Work includes concrete curb, landscaping, irrigation and colored, stamped concrete. PROJECT NEED: The median is needed to bring this section of Carlsbad Boulevard up to City Standards for a major arterial. FINANCING: Purpose Estimated Cost Funding Source Design/Construction $2,197,000 Gas Tax Total Cost= $2,197,000 Page 181 CBAD BLVD_MTNVIEW WIDENING CAPITAL PROJ NONE PROJECT NO. MOUNTAIN VIEW DRIVE TO NORTHERLY CITY LIMITS PROJECT NAME The project consists of widening Carlsbad Boulevard to a modified Major Arterial roadway. The improvements will include two travel lanes and a bike lane in each direction with a 6" raised median in a 64' wide roadway. This project was included in the 2008 Traffic Impact Fee Program Update. The widening is required to meet Growth Management Standards and the Circulation Element of the General Plan. FINANCING: Purpose Design/Construction Design/Construction Design/Construction Total Cost= Estimated Cost $1,012,960 $782,496 $6,905,600 $12,706,000 Funding Source TIF {RTCIP) TIF Unfunded Page 182 CAPITAL PROJECT DESCRIPTION CIRCULATION SYSTEM STREET PROJECTS -CARLSBAD BOULEVARD BRIDGE RETROFIT OVER SAN DIEGO NORTHERN RAILROAD PROJECT NAME 3557 PROJECT NO. PROJECT LOCATION MAP: PROJECT LOCATION: RR bridge PACIFIC OCEAN On Carlsbad Boulevard 500' southerly of its intersection with State Street. PROJECT DESCRIPTION: The project consists of retrofitting the existing 72 year old two-lane bridge and constructing a new four-lane bridge with bicycle lanes and sidewalks over the San Diego Northern Railroad. PROJECT NEED: Caltrans has determined that the bridge over the railroad is vulnerable to severe damage during the design earthquake. Caltrans and the Federal Highways Administration will fund a seismic retrofit of the bridge. FINANCING: Purpose Design Construction Total Cost= Estimated Cost Funding Source $500,000 TransNet/Local* $1,234,000 TransNet/Local* $1,734,000 * Funds totaling approximately $1,054,000 to be reimbursed from Federal and State Grants. Page 183 CAPITAL PROJECT DESCRIPTION CIRCULATION SYSTEM STREET PROJECTS -CARLSBAD BOULEVARD WIDENING - CANNON ROAD TO MANZANO DRIVE PROJECT NAME NONE PROJECT NO. PROJECT LOCATION MAP: PROJECT LOCATION: CANNON ROAD io,:i ~ ~ :xi p::; Cl Cl DRIVE er:, .....:I io,:i 0 .....:I ~ ICQ ~ ..:i:: .....:I er:, io,:i C> .....:I DRIVE PROJECT CBADWIDE Cl ~ .....:I ~ Carlsbad Boulevard from Manzano Drive to Cannon Road. PROJECT DESCRIPTION: Widen Carlsbad Boulevard from two lanes to four lanes with a center raised median (major arterial). Construct pavement, curb and gutter, stamped concrete and landscaping. A planning study was initiated in 1992 to determine alignment alternatives and investigate property access problems. PROJECT NEED: Required to meet Growth Management Standards and the Circulation Element of the General Plan. FINANCING: Purpose Estimated Cost Funding Source Design/Construction $5,574,400 TIF Total Cost= $5,574,400 Page 184 CAPITAL PROJECT DESCRIPTION CIRCULATION SYSTEM STREET PROJECTS -CARLSBAD VILLAGE DRIVE WIDENING PROJECT NAME NONE PROJECT NO. PROJECT LOCATION MAP: PROJECT LOCATION: MEDIAN CVDWIDEN On Carlsbad Village Drive from 200 feet east of Pontiac Drive to 200 feet east of Victoria Street. PROJECT DESCRIPTION: Widen Carlsbad Village Drive to one travel lane and a bike lane in each direction with a raised median in a 40' wide roadway. Construct curb & gutter, sidewalk, streetlights, median curb, base and asphalt pavement. The project design may include standard modifications consistent with local environmental and topographical constraints of the project site. PROJECT NEED: Required to meet Growth Management Standards and the Circulation Element of the General Plan. FINANCING: Purpose Design/Construction Total Cost= Estimated Cost Funding Source $2,466,880 $2,466,880 TIF Page 185 CAPITAL PROJECT DESCRIPTION 6017 CIRCULATION SYSTEM STREET PROJECTS -CARLSBAD VILLAGE DRIVE AND AVENIDA DE ANITA PROJECT NO. PROJECT LOCATION MAP: CVD_ADA PROJECT NAME PROJECT LOCATION: Northwest corner of Carlsbad Village Drive and Avenida de Anita. PROJECT DESCRIPTION: Reconstruct Avenida de Anita as it approaches Carlsbad Village Drive to reduce the grade break at the intersection. PROJECT NEED: The project will reduce the grade break at the intersection and eliminate the damage to the roadway and large vehicles. NCTD experiences problems with their buses due to the grade break and may consider eliminating bus services to the general area. FINANCING: Purpose Design Construction Ad min/Inspection Total Cost= Estimated Cost $22,000 $65,000 $15,000 $105,000 Fonding Source GCC GCC GCC Page 186 CollegeA Page 187 CAPITAL PROJECT DESCRIPTION 3636 CIRCULATION SYSTEM STREET PROJECTS – COLLEGE BOULEVARD REACH A AND CANNON ROAD REACH 4A PROJECT NO. PROJECT NAME PROJECT LOCATION MAP: PROJECT LOCATION: College Boulevard east of ECR from the existing College Boulevard terminus at Badger Lane to Cannon Road and Cannon Road from College Boulevard to approximately 1,200 foot east. PROJECT DESCRIPTION: Construction of the core improvements to College Boulevard from Badger Lane to Cannon Road and Cannon Road from College Boulevard to approximately 1,200 feet east of the College/Cannon intersection. The core improvements include full-width grading, two 18-foot paved travel lanes (one on each side of a raised unimproved median), median curbs, transition to full improvements at the intersection of College Boulevard and Cannon Road, drainage improvements to protect the road fill, a bridge structure across Sunny Creek, erosion control, environmental mitigation and Master Drainage Plan flood retention Basin BJ. The Basin BJ improvements include relocation of the existing private RV storage, maintenance facilities and community garden owned by the Rancho Carlsbad Mobile Home Park residents which currently occupy the proposed basin site. PROJECT NEED: The project is needed to comply with the City’s Growth Management Plan and to complete the Circulation Element. FINANCING: Purpose Estimated Cost Funding Source Environmental $220,000 Other (Developer) Construction $1,493,002 Other (Developer) Total Cost = $1,713,002 CAPITAL PROJECT DESCRIPTION CIRCULATION SYSTEM STREET PROJECTS -COLLEGE BOULEVARD/CANNON ROAD REACH 3 ASSESSMENT DISTRICT PROJECT NAME 3879 PROJECT NO. PROJECT LOCATION MAP: PROJECT LOCATION: B&TD_4 \\ '\' t \\ \ \ \\ I I Along the extension of College Boulevard from Cannon Road to Carlsbad Village Drive and along the extension of Cannon Road from El Camino Real to College Boulevard. PROJECT DESCRIPTION: Formation of a financing district for the purpose of financing the construction of the above described sections of College Boulevard and Cannon Road. The improvements within the project include full width grading of the College and Cannon roadways to major arterial standards, construction of the center two lanes separated by a raised unimproved median, installation of needed drainage improvements to protect the roadbed, and full width improvements of the arterial intersections with El Camino Real. The outside traffic lanes, fronting improvements and median landscaping/hardscaping will be the obligation of adjacent developing property owners. PROJECT NEED: The project is required to complete the Circulation Element of the General Plan and to comply with the Growth Management Standard for circulation facilities. Financing for the project is required prior to any further development within Zones 7 and 14. Construction of the project may occur in phases consistent with the requirements of the various individual zone plans. FINANCING: Purpose Construction Total Cost= Estimated Cost $10,314,481 $10,314,481 Funding Source Assessment District Page 188 CAPITAL PROJECT DESCRIPTION CIRCULATION SYSTEM STREET PROJECTS -CONCRETE REPAIR PROGRAM PROJECT NAME 6013 & 6021 PROJECT NO. PROJECT LOCATION MAP: PROJECT LOCATION: VARIOUS LOCATIONS OF CITY CONCRETEREPAI R Located along streets included in the Pavement Management Program throughout the City. PROJECT DESCRIPTION: Miscellaneous concrete repairs to sidewalks, curb and gutter, driveway aprons and cross gutters. PROJECT NEED: Concrete curb and gutter, sidewalk, driveways and cross gutters are damaged and in need of replacement. FINANCING: Purpose Construction Construction Total Cost= Estimated Cost Funding Source $250,000 $2,250,000 $2,500,000 GCC GAS TAX Page 189 ECR_CANNON Page 190 CAPITAL PROJECT DESCRIPTION NONE CIRCULATION SYSTEM STREET PROJECTS – EL CAMINO REAL AND CANNON ROAD INTERSECTION IMPROVEMENTS PROJECT NO. PROJECT NAME PROJECT LOCATION MAP: PROJECT LOCATION: El Camino Real and Cannon Road intersection. PROJECT DESCRIPTION: The project consists of widening the existing bridge structure and roadway to provide a left turn land, 3 northbound thru lanes, bike lane, dedication right turn land and a sidewalk. PROJECT NEED: This project was included in the 2008 Traffic Impact Fee Program Update. The widening will enable this leg of the intersection to operate at an acceptable level of service in the buildout condition. FINANCING: Purpose Estimated Cost Funding Source Design/Construction $589,000 TIF Total Cost = $589,000 CAPITAL PROJECT DESCRIPTION NONE CIRCULATION SYSTEM STREET PROJECTS -EL CAMINO REAL AND CARLSBAD VILLAGE DRIVE PROJECT NO. PROJECT LOCATION MAP: ECRCVDR I I I I I I I I I I I I I I I I I I I I l CARLSBAD VILLAGE DR. I I I I I I I I I I ....::I I I -=t: J:x:l 0::: I I C) I I z ~ I I CJ ....::I I I J:x:l PROJECT NAME PROJECT LOCATION: At the intersection of El Camino Real and Carlsbad Village Drive. PROJECT DESCRIPTION: Construct northbound and southbound dual left-turn lanes on El Camino Real. PROJECT NEED: Required to meet Growth Management Standards. FINANCING: Purpose Construction Total Cost= Estimated Cost Funding Source $899,600 $899,600 TIF Page 191 ECR_TAM LT.docx Page 192 CAPITAL PROJECT DESCRIPTION NONE CIRCULATION SYSTEM STREET PROJECTS – EL CAMINO REAL AND TAMARACK AVENUE LEFT-TURN LANE PROJECT NO. PROJECT NAME PROJECT LOCATION MAP: PROJECT LOCATION: El Camino Real and Tamarack Avenue intersection. PROJECT DESCRIPTION: Provide an additional left turn lane from northbound El Camino Real to westbound Tamarack Avenue. PROJECT NEED: This project was included in the 2008 Traffic Impact Fee Program Update. The widening will accommodate a dedicated left-turn lane which will enable this leg of the intersection to operate at an acceptable level of service in the buildout condition. FINANCING: Purpose Estimated Cost Funding Source Design/Construction $286,000 TIF Total Cost = $286,000 CAPITAL PROJECT DESCRIPTION CIRCULATION SYSTEM STREET PROJECTS -EL CAMINO REAL MEDIANS PROJECT NAME 3643 & 3909 PROJECT NO. PROJECT LOCATION MAP: PROJECT LOCATION: L----o·-! L ___ _ EC RM DIAN At various locations along El Camino Real between the north and south City boundaries. PROJECT DESCRIPTION: Construct raised, landscaped medians at various places where no developer will be obligated to do so as a condition of a private development. Work includes median curb, stamped concrete paving, irrigation and landscaping. NOTE: Project funds may be used to reimburse developer for construction of median improvements in excess of those improvements required of the development. Currently, $100,000 i? budgeted to reimburse the Evans Point developer for median improvements constructed adjacent to the Rancho Carlsbad Mobile Home Park. PROJECT NEED: Raised landscaped medians are required on prime arterials for vehicular safety and to meet City standards. FINANCING: Purpose Design/Construction Design/Construction Total Cost= Estimated Cost $2,300,000 $2,866,600 $5,166,600 Funding Source PFF Gas Tax Page 193 RCR_ALGA RT Page 194 CAPITAL PROJECT DESCRIPTION NONE CIRCULATION SYSTEM STREET PROJECTS – EL CAMINO REAL AND ALGA ROAD RIGHT-TURN LANE PROJECT NO. PROJECT NAME PROJECT LOCATION MAP: PROJECT LOCATION: Southeast corner of El Camino Real and Alga Road. PROJECT DESCRIPTION: Modify the right turn lane configuration from northbound El Camino Real to eastbound Alga Road. PROJECT NEED: This project was included in the 2008 Traffic Impact Fee Program Update. The widening will accommodate a dedicated right-turn lane which will enable this leg of the intersection to operate at an acceptable level of service in the buildout condition. FINANCING: Purpose Estimated Cost Funding Source Design/Construction $348,400 TIF Total Cost = $348,400 CAPITAL PROJECT DESCRIPTION CIRCULATION SYSTEM STREET PROJECTS -EL CAMINO REAL WIDENING - CASSIA ROAD TO CAMINO VIDA ROBLE PROJECT NAME NONE PROJECT NO. PROJECT LOCATION MAP: PROJECT LOCATION: ECR_Cass East side of El Camino Real north of Cassia Road to Camino Vida Roble. PROJECT DESCRIPTION: Widening approximately 2,000 linear feet of roadway including construction of curb, gutter, sidewalks, pavement, median, roadway rehabilitation, and signal modifications on El Camino Real. PROJECT NEED: Project is needed to comply with the city's Growth Management Program and to complete the Circulation Element of the General Plan. FINANCING: Purpose Design & Environmental Right-of-Way Construction Total Cost= Estimated Cost $407,000 $500,000 $3,119,000 $4,026,000 Funding Source TransNet-Loc TransNet-Loc TransNet-Loc Page 195 CAPITAL PROJECT DESCRIPTION CIRCULATION SYSTEM STREET PROJECTS -EL CAMINO REAL WIDENING LA COSTA AVENUE TO ARENAL ROAD PROJECT NAME 3909 PROJECT NO. PROJECT LOCATION MAP: PROJECT LOCATION: ' -, LAGOON ----- ECRLACOS On the west side of El Camino Real from La Costa Avenue to Arenal Road. PROJECT DESCRIPTION: Add the southbound lane for a length of approximately 3,400 feet to widen the street to full prime arterial standards. Construct curb & gutter, sidewalk, base, asphalt pavement, streetlights and full median improvements. PROJECT NEED: Required to comply with Growth Management Standards. FINANCING: Purpose Estimated Cost Funding Source Design/Construction $625,040 Design/Construction $1,772,160 Total Cost= $2,397,200 TIF (RTCIP) TIF Page 196 CAPITAL PROJECT DESCRIPTION CIRCULATION SYSTEM STREET PROJECTS -EL CAMINO REAL WIDENING - LISA STREET TO CRESTVIEW DRIVE PROJECT NAME NONE PROJECT NO. PROJECT LOCATION MAP: PROJECT LOCATION: ECR_Lisa West side of El Camino Real from south of Lisa Street to Crestview Drive. PROJECT DESCRIPTION: Widening approximately 1,200 linear feet of roadway including construction of curb, gutter, sidewalks, pavement, median, and roadway rehabilitation on El Camino Real. PROJECT NEED: Project is needed to comply with the city's Growth Management Program and to complete the Circulation Element of the General Plan. FINANCING: Purpose Design & Environmental Right-of-Way Construction Total Cost= Estimated Cost $82,000 $250,000 $870,000 $1,202,000 Funding Source *TransNet Local *TransNet Local *TransNet Local *Funding source may change if adjacent property develops or assessment districts are formed. Page 197 CAPITAL PROJECT DESCRIPTION CIRCULATION SYSTEM STREET PROJECTS -EL CAMINO REAL WIDENING - NORTH OF COUGAR DRIVE PROJECT NAME 3920 PROJECT NO. PROJECT LOCATION MAP: PROJECT LOCATION: Elcamino East side of El Camino Real north of Cougar Drive. PROJECT DESCRIPTION: Widening approximately 250 linear feet of roadway including construction of curb, gutter, sidewalks, pavement, median, and roadway rehabilitation on El Camino Real. PROJECT NEED: El Camino Real is identified in the SANDAG Congestion Management Plan (CMP) as a failing road. Adjacent property is fully developed. Widening this section of roadway will contribute to the City's CMP deficiency plan as mandated by the State. FINANCING: Purpose Design & Environmental Right-of-Way Construction Total Cost= Estimated Cost $30,000 $60,000 $484,782 $574,782 Funding Source TransNet Local TransNet Local TransNet Local Page 198 ECRWIDE2 Page 199 CAPITAL PROJECT DESCRIPTION 3957 & 3929 CIRCULATION SYSTEM STREET PROJECTS - EL CAMINO REAL WIDENING TAMARACK AVENUE TO CHESTNUT AVENUE PROJECT NO. PROJECT NAME PROJECT LOCATION MAP: PROJECT LOCATION: Along El Camino Real from Tamarack Avenue to Chestnut Avenue. PROJECT DESCRIPTION: Add the outside lane to widen street to full prime arterial standards. Widen west side approximately 1,200 feet in length and east side approximately 600 feet in length. Construct curb & gutter, sidewalk, base, and asphalt pavement and streetlights. PROJECT NEED: To complete widening to prime arterial standards where no developers are likely to develop and to improve the road capacity. FINANCING: Purpose Estimated Cost Funding Source Design/Construction $345,000 TransNet-STP Design/Construction $3,925,885 TransNet-LOC Construction $7,656,023 TIF Construction $422,000 TIF (RTCIP) Total Cost = $12,348,908 ELFUERTE EXTENSION Page 200 CAPITAL PROJECT DESCRIPTION 6009 CIRCULATION SYSTEM STREET PROJECTS – EL FUERTE STREET EXTENSION PROJECT NO. PROJECT NAME PROJECT LOCATION MAP: PROJECT LOCATION: The extension of El Fuerte Street from Loker Avenue northerly to Faraday Avenue. PROJECT DESCRIPTION: Construction of El Fuerte Street from its current terminus at Loker Avenue northerly to Faraday Avenue. The project would include the construction of two travel lanes in each direction, curbs and gutters, sidewalks, landscaped median. PROJECT NEED: The project is required to implement the Circulation Element of the General Plan and to comply with the Growth Management Standard. The project will provide another circulation roadway through the industrial properties within the area. FINANCING: Purpose Estimated Cost Funding Source Design/Construction $4,095,146 Other Total Cost $4,095,146 CAPITAL PROJECT DESCRIPTION CIRCULATION SYSTEM FREEWAY INTERCHANGE PROJECTS -INTERSTATE 5 AND LA COSTA AVENUE AUXILIARY LANES PROJECT NAME NONE PROJECT NO. PROJECT LOCATION MAP: PROJECT LOCATION: PROJECT / l-5LACOS ( '" .., '" At the intersection of Interstate 5 and La Costa Avenue. PROJECT DESCRIPTION: The addition of auxiliary traffic lanes on Interstate 5 to be installed at the future direction of Caltrans. PROJECT NEED: Required to meet Growth Management Standards. FINANCING: Purpose Estimated Cost Funding Source Design/Construction $2,000,000 CFO #1 Total Cost= $2,000,000 Page 201 LA COSTA Page 202 CAPITAL PROJECT DESCRIPTION 6024 CIRCULATION SYSTEM STREET PROJECTS – LA COSTA AVENUE SLOPE REPAIR WEST OF ROMERIA STREET PROJECT NO. PROJECT NAME PROJECT LOCATION MAP: PROJECT LOCATION: The south side of La Costa Avenue approximately 740 feet west of Romeria Street. PROJECT DESCRIPTION: The project will begin with a study of the slope adjacent to La Costa Avenue and recommend appropriate action measures to ensure protection of the roadway and adjacent private properties. The project will consist of detailed geotechnical analysis, preliminary environmental impact analysis, and a preliminary design of the appropriate remediation project. PROJECT NEED: Residents have contacted the City expressing concern over a potential slope failure on La Costa Avenue. The results of a geotechnical investigation will indicate whether this is a high-priority or if minor remediation measures can be performed by City staff. FINANCING: Purpose Estimated Cost Funding Source Study/Design $46,000 Gas Tax Environmental $53,000 Gas Tax Construction $100,000 Gas Tax Total Cost = $199,000 CAPITAL PROJECT DESCRIPTION CIRCULATION SYSTEM STREET PROJECTS -MARSELLA WALL BEAUTIFICATION PROJECT NAME 6020 PROJECT NO. PROJECT LOCATION MAP: PROJECT LOCATION: MARSELLA La Costa Marbella Condominiums. PROJECT DESCRIPTION: Develop visual alternatives and estimated costs for the beautification of the newly constructed retaining wall. The project envisions hiring a consultant to prepare alternative architectural and landscape proposals. The project would include community outreach meetings. PROJECT NEED: The project would provide the City Council with alternative beautification proposals for the existing wall. Future additional appropriations would be necessary to implement the desired project. FINANCING: Purpose Design Construction Ad min/Inspection Total Cost= Estimated Cost Funding Source $50,000 $90,000 $40,000 $180,000 GCC GCC GCC Page 203 CAPITAL PROJECT DESCRIPTION CIRCULATION SYSTEM STREET PROJECTS -MELROSE DRIVE AND ALGA ROAD PROJECT NAME NONE PROJECT NO. PROJECT LOCATION MAP: PROJECT LOCATION: MELROALG.doc I I I I I I . I I I I I I I I I I I I I I I I I I I I I I I I I I I ALGA ROAD At the intersection of Melrose Drive and Alga Road. PROJECT DESCRIPTION: Construct dual left-turn lanes on all approaches to the intersections- northbound, southbound, eastbound and westbound. PROJECT NEED: Required to meet Growth Management Standards. FINANCING: Purpose Design/Construction Total Cost= Estimated Cost Funding Source $983,840 $983,840 TIF (RTCIP) Page 204 MELROSE_PAR RT Page 205 CAPITAL PROJECT DESCRIPTION NONE CIRCULATION SYSTEM STREET PROJECTS – MELROSE DRIVE TURN LANE TO WEST PALOMAR AIRPORT ROAD PROJECT NO. PROJECT NAME PROJECT LOCATION MAP: PROJECT LOCATION: Northwest corner of Melrose Drive and Palomar Airport Road. PROJECT DESCRIPTION: Widen southbound Melrose Drive to provide an additional right-turn lane to westbound Palomar Airport Road. PROJECT NEED: This project was included in the 2008 Traffic Impact Fee Program Update. The widening will accommodate a dedicated right-turn lane which will enable this leg of the intersection to operate at an acceptable level of service in the buildout condition. FINANCING: Purpose Estimated Cost Funding Source Design/Construction $410,000 TIF Total Cost = $410,000 PARCOLL_INTRSCTON Page 206 CAPITAL PROJECT DESCRIPTION NONE CIRCULATION SYSTEM STREET PROJECTS - PALOMAR AIRPORT ROAD AND COLLEGE BOULEVARD PROJECT NO. PROJECT NAME PROJECT LOCATION MAP: PROJECT LOCATION: At the intersection of the Palomar Airport Road and College Boulevard. PROJECT DESCRIPTION: Construct dedicated right turn lanes on the WB, SB and NB legs of the intersection. Project includes construction of storm drain improvements within the southbound lane and an inlet on the northeast corner to collect runoff from hole #7 of the Crossings Golf Course. Project work may also require reconstruction of median improvements, striping and signal modifications, and acquisition of necessary right-of-way. PROJECT NEED: Required to meet Growth Management Standards. FINANCING: Purpose Estimated Cost Funding Source Studies $50,000 TIF/GCC Environmental $25,500 TIF/GCC Design $100,000 TIF/GCC Construction $587,000 TIF/GCC Admin/Inspection $75,500 TIF/GCC Total Cost = $837,500 PAR_MEL.docx CAPITAL PROJ D RIPTION 6012 PROJECT NO. MELROSE AVENUE RIGHT-TURN LANE PROJECT NAME PROJECT LOCATION: Southwest corner of Palomar Airport Road and Melrose Avenue. Widening Palomar Airport Road to provide a right-turn lane to southbound Melrose Avenue. The widening will accommodate a dedicated right-turn lane which will enable this leg of the intersection to operate at an acceptable level of service in the buildout condition. Purpose Design/Construction Design/Construction Total Cost= $165,980 $88,500 $254,480 Other TIF Page 207 PROJ PAR-PDNLTURNLANE N PROJECT NO. Eastbound Palomar Airport Road to northbound Paseo Del Norte. PROJECT DESCRIPTION: Construct an eastbound left turn lane on Palomar Airport Road at the intersection of Paseo del Norte. The project would include construction of a 60 foot long lane in addition to a 97 foot long transition. The widening will accommodate a longer left turn lane which will enable this leg of the intersection to operate at an acceptable level of service in the buildout condition. Project MS 07-02 is conditioned to pay a 13% fair share for the construction of this project. Design Construction Administration Total Cost= Estimated Cost $15,753 $157,530 $22,054 $195,337 Developer/Gas Tax Developer/Gas Tax Developer/Gas Tax Page 208 PAR-PDNRTURNLANE C Pl PROJ DESCRIPTION NONE CIRCULATION SYSTEM STREET PROJECTS -PALOMAR AIRPORT ROAD AND PASEO DEL NORTE RIGHT TURN LANE PROJECT NO. PROJECT NAME PROJECT LOCATION: Eastbound Palomar Airport Road to southbound Paseo Del Norte. PROJECT DESCRIPTION: Construct an eastbound right turn lane on eastbound Palomar Airport Road at the intersection to southbound Paseo del Norte. The project would include construction of a 250 foot long lane in addition to a 90 foot long transition. Traffic signal modifications will also be required. PROJECT NEED: The widening will provide for the construction of a right turn lane which will enable this leg of the intersection to operate at an acceptable level of service in the buildout condition. This project was identified as part of the environmental review of the proposed Legoland Hotel project. FINANCING: Purpose Design Construction Administration Total Cost= Estimated Cost $43,312 $433,122 $60,637 $537,071 Developer/Gas Tax Developer/Gas Tax Developer/Gas Tax Page 209 CAPITAL PROJ PROJECT LOCATION MAP: PAR_EI Fuerte DESCRIPTION NONE PROJECT NO. Northeast corner of Palomar Airport Road and El Fuerte Street. PROJECT DESCRIPTION: Widen westbound Palomar Airport Road to provide a right-turn lane to northbound El Fuerte Street PROJECT NEED: The widening will accommodate a dedicated right-turn lane which will enable this leg of the intersection to operate at an acceptable level of service in the buildout condition. FINANCING: Purpose Estimated Cost Funding Source Design/Construction $952,640 TIF Total Cost= $952,640 Page 210 CAPITAL PR J DESCRIPTION CIRCULATION SYSTEM STREET PROJECTS -PALOMAR AIRPORT ROAD AND EL CAMINO REAL RIGHT-TURN LANE PROJECT NAME NONE PROJECT NO. PROJECT LOCATION MAP: PROJECT LOCATION: PAR_ECR RT Southwest corner of Palomar Airport Road and El Camino Real. PROJECT DESCRIPTION: Widen eastbound Palomar Airport Road to provide a right-turn lane to southbound El Camino Real. PROJECT NEED: This project was included in the 2008 Traffic Impact Fee Program Update. The widening will accommodate a dedicated right-turn lane which will enable this leg of the intersection to operate at an acceptable level of service in the buildout condition. FINANCING: Purpose Estimated Cost Funding Source Design/Construction $590,720 TIF Total Cost= $590,720 Page 211 CAPITAL PROJECT DESCRIPTION CIRCULATION SYSTEM STREET PROJECTS -PALOMAR AIRPORT ROAD WIDENING AT PASEO DEL NORTE PROJECT NAME 3811 PROJECT NO. PROJECT LOCATION MAP: PROJECT LOCATION: Par_pdn On the north side of Palomar Airport Road at the intersection with Paseo Del Norte. PROJECT DESCRIPTION: Widen the easterly approach of Palomar Airport Road (PAR) at the intersection of Paseo Del Norte (PON) to accommodate an additional through lane. The added lane would be designed to align with the existing "right-turn only" lane onto northbound Interstate 5. The existing westbound to northbound right-turn lane from PAR to PON would be relocated slightly north of its current location to eliminate the partial offset with the existing "right-turn only' lane on the west side of the intersection. PROJECT NEED: Required to meet the Growth Management Circulation Standard. The current intersection is operating at an unacceptable level of service due to a backup of traffic attempting to go northbound along Interstate 5. This project will allow for smoother transition of the westbound to northbound traffic into the two right-turn lanes to northbound 1-5 from traffic proceeding westbound along PAR through the PON intersection. FINANCING: Purpose Adm in/Inspection Construction Total Cost= Estimated Cost $60,000 $1,616,019 $1,676,019 Funding Source TIF TIF Page 212 CAPITAL PROJECT DESCRIPTION NONE CIRCULATION SYSTEM STREET PROJECTS -PARK DRIVE, MARINA DRIVE TO COVE DRIVE PROJECT NO. PROJECT LOCATION MAP: SITE Park_dr PROJECT NAME PROJECT LOCATION: Westerly side of Park Drive between Marina Drive and Cove Drive. PROJECT DESCRIPTION: Reconstruct the westerly curb, gutter, and sidewalk along Park Drive between marina Drive and Cove Drive. PROJECT NEED: The project will improve the condition of this segment of roadway so it is consistent with the goal of providing a safe and efficient transportation system. FINANCING: Purpose Design Construction Admin/lnspection Total Cost= Estimated Cost $25,000 $381,300 $10,000 $416,300 Funding Source GCC GCC GCC Page 213 CAPITAL PROJECT DESCRIPTION CIRCULATION SYSTEM STREET PROJECTS -PAVEMENT MANAGEMENT PROGRAM PROJECT NAME 6001 PROJECT NO. PROJECT LOCATION MAP: PROJECT LOCATION: THROUGHOUT THE CITY PVMTMGMT Throughout the City. PROJECT DESCRIPTION: The Pavement Management Program is an ongoing annual program designed to extend the service life of city streets and to maintain a smooth and safe driving surface for vehicles. The City utilizes a pavement management database program to determine pavement management needs for the purpose of establishing which streets are to be slurry sealed, overlaid, or reconstructed. On a periodic basis the condition of the roads are field surveyed and the pavement management database is updated to reflect current conditions. Each year, specific pavement management projects are defined and funding is transferred into a pavement management project account. PROJECT NEED: City streets require annual maintenance to maintain a safe and smooth driving surface and to extend the useful service life of the streets. FINANCING: Purpose Pavement Management Pavement Management Pavement Management Pavement Management Pavement Management Total Cost= Estimated Cost $51,010,515 $20,030,000 $3,167,193 $7,994,088 $12,267,476 $94,469,272 Funding Source TransNet-Loc State Trans (Prop 42) State Trans (Prop 1 B) Gas Tax TransNet-Loc (Non-Juris) Page 214 PROJECT LOCATION MAP: B&TD#2E CAPITAL PROJECT DESCRIPTION CIRCULATION SYSTEM STREET PROJECTS -POINSETTIA LANE REACH "E" (CASSIA ROAD TO SKIMMER COURT) PROJECT NAME PROJECT LOCATION: 3922 PROJECT NO. Along the future extension of Poinsettia Lane from its existing terminus at Cassia Road east to Skimmer Court. PROJECT DESCRIPTION: Partial funding for construction of Reach "E" of Poinsettia Lane including full width grading to major arterial standards, adequate drainage improvements necessary to protect the roadbed, and two 18-foot paved traffic lanes separated by a raised unimproved median. Also included within the project are all land acquisition and environmental mitigation costs. The project is part of the improvements funded by Bridge and Thoroughfare District No. 2 (B& TD#2). PROJECT NEED: Required pursuant to the City's Circulation Elements and Growth Management Program. FINANCING: Purpose Design/Construction Land Acquisition Total Cost= Estimated Cost $13,460,600 $13,460,600 Funding Source B&TD#2 Page 215 CAPITAL PROJECT DESCRIPTION NONE CIRCULATION SYSTEM STREET PROJECTS -BRIDGE AND THOROUGHFARE DISTRICT NO. 2 PROJECT NO. POINSETTIA LANE REACHES A, B, C, F, G & AVIARA PARKWAY REIMBURSEMENT PROJECT NAME PROJECT LOCATION MAP: PROJECT LOCATION: AVIA_ECR.docx Along Poinsettia Lane from the eastern Zone 19 boundary to El Camino Real. PROJECT DESCRIPTION: Reimbursement for construction of Reach A, B, C, F, & G of Poinsettia Lane and a portion of Aviara Parkway including full-width grading to major arterial standards, adequate drainage improvements necessary to protect the roadbed, and two 18-foot paved traffic lanes separated by a raised unimproved median. The project is part of the improvements funded by Bridge and Thoroughfare District No. 2 (B& TD#2). PROJECT NEED: Required to meet Growth Management Standards for future development within Local Facility Management Zone. FINANCING: Purpose Estimated Cost Funding Source Construction $1,373,558 B&TD #2 Total Cost= $1,373,558 Page 216 CAPITAL PROJECT DESCRIPTION 3689 CIRCULATION SYSTEM STREET PROJECTS -POINSETTIA LANE EAST OF EL CAMINO REAL PROJECT NO. PROJECT LOCATION MAP: POINEAST FINANCING PROGRAM PROJECT NAME PROJECT LOCATION: Along the future alignment of Poinsettia Lane from El Camino Real east to El Fuerte Street. PROJECT DESCRIPTION: Formation of a financing district/program to guarantee the construction of Poinsettia Lane to full major arterial standards west of El Camino Real. The project, in conjunction with the Poinsettia Lane improvements proposed west of El Camino Real, will complete another east/west arterial linkage from Melrose Drive to Interstate 5. PROJECT NEED: Required pursuant to the City Circulation Element and Growth Management Program. FINANCING: Purpose Construction Total Cost= Estimated Cost $28,932,793 $28,932,793 Funding Source Other Page 217 CAPITAL PROJECT DESCRIPTION CIRCULATION SYSTEM STREET PROJECTS -POINSETTIA LANE WIDENING (PASEO DEL NORTE TO BATIQUITOS LANE) PROJECT NAME NONE PROJECT NO. PROJECT LOCATION MAP: PROJECT LOCATION: POINWIDE From Paseo Del Norte to Batiquitos Lane. PROJECT DESCRIPTION: At Batiquitos Lane -Widen to provide dedicated right turn lanes along both eastbound and westbound Poinsettia Lane. At Paseo del Norte -restripe westbound lanes in conjunction with roadway widening along the northeast corner to realign traffic as it approaches the freeway on ramps west of Paseo del Norte. PROJECT NEED: Required to meet Growth Management Standards. FINANCING: Purpose Estimated Cost Funding Source Design/Construction $825,760 TIF Total Cost= $825,760 Page 218 CAPITAL PROJECT DESCRIPTION CIRCULATION SYSTEM STREETS PROJECTS -RANCHO SANTA FE ROAD AND OLIVENHAIN ROAD IMPROVEMENTS PROJECT NAME 3860 PROJECT NO. PROJECT LOCATION MAP: PROJECT LOCATION: PROJECT OLIVENHAIN 1 CITY OF , CARLSBAD cii oi ENCINITAS ----, ~ Olivenrsf Intersection of Rancho Santa Fe Road and Olivenhain Road. PROJECT DESCRIPTION: Complete full intersection improvements to the Rancho Santa Fe Road and Olivenhain Road intersection to General Plan standards. Extend street improvements on Rancho Santa Fe Road between the Olivenhain Municipal Water District access to a distance approximately 200 feet east of the intersection with Olivenhain Road. Extend street improvements on Olivenhain Road from the intersection with Olivenhain Road west to meet existing full-width improvements within the City of Encinitas. The project would involve right-of-way acquisition, grading, storm drains, removal of existing improvements and installation of surface improvements, street lights, and coordination with agencies for utility realignment PROJECT NEED: These improvements are required in order to keep intersection capacity at or below the thresholds dictated by the Growth Management Standards and per the General Plan for build-out. Full intersection improvements will improve vehicular circulation and increase safety to serve the public and nearby developments to the south that will impact the intersection once full occupancy is reached. The City of Encinitas and Olivenhain Municipal Water District are in support of the project and will deposit funds with the City of Carlsbad for their share of the improvements. FINANCING: Purpose Estimated Cost Design/Construction $5,985,905 Total Cost = $5,985,905 Funding Source RSF Road Page 219 CAPITAL PROJECT DESCRIPTION 3923 & 3907 CIRCULATION SYSTEM STREET PROJECTS -RANCHO SANTA FE ROAD NORTH PHASE II PROJECT NO. PROJECT LOCATION MAP: PROJECT RSFNPHII PROJECT NAME PROJECT LOCATION: Along Rancho Santa Fe Road from approximately 1,800 feet south of San Elijo Road to Melrose Drive. PROJECT DESCRIPTION: Realignment and widening of Rancho Santa Fe Road and construction of new bridge structures over the San Marcos Creek. Includes post construction mitigation. PROJECT NEED: Required to meet Growth Management Standards. FINANCING: Purpose Design/Environmental Bridge Pipeline Replacement Mitigation/Monitoring Total Cost= Estimated Cost $3,100,000 $14,768,000 $773,000 $2,030,000 $20,671,000 Funding Source RSF Road RSF Road RSF Road RSF Road Page 220 CAPITAL PROJECT DESCRIPTION 6019 CIRCULATION SYSTEM STREET PROJECTS -VALLEY STREET AND MAGNOLIA AVENUE SIDEWALKS PROJECT NO. PROJECT LOCATION MAP: VALLEY PROJECT NAME PROJECT LOCATION: Valley Street from Magnolia Avenue to Chestnut Street, and Magnolia Avenue from Valley Street northeast 4 70 feet. PROJECT DESCRIPTION: Construction of street widening and sidewalk improvements along portions of Valley Street and Magnolia Avenue in the vicinity of Carlsbad High School, Valley Middle School, and Magnolia Elementary School. PROJECT NEED: The street widening and sidewalks will construct missing pedestrian routes for students attending Carlsbad High School, Valley Middle School, and Magnolia Elementary School. FINANCING: Purpose Design Property Acquisition Construction Admin/1 nspection Total Cost= Estimated Cost $30,000 $15,000 $800,000 $90,000 $935,000 Funding Source TIF TIF TIF TIF Page 221 CAPITAL PROJECT DESCRIPTION 6002 CIRCULATION SYSTEM STREET PROJECTS -SIDEWALK/STREET CONSTRUCTION PROGRAM PROJECT NAME PROJECT NO. PROJECT LOCATION MAP: N/A SWCONPGM PROJECT LOCATION: Various streets throughout the City. PROJECT DESCRIPTION: The Sidewalk/Street Construction Program is an annual program designed to complete missing links of sidewalk throughout the City. In most cases, construction of the sidewalk improvements involve construction of adjacent street improvements to bring them into conformance with City Standards. Each year, several sidewalk/street projects are selected from the City's missing sidewalk priority list for inclusion into that year's sidewalk/street construction project. PROJECT NEED: Required to meet the pedestrian circulation policies of the Circulation Element of the General Plan. FINANCING: Purpose Estimated Cost Funding Source Design/Construction $3,295,672 TIF Total Cost= $3,295,672 Page 222 CAPITAL PROJECT DESCRIPTION CIRCULATION SYSTEM STREET PROJECTS -TAMARACK AVENUE AND ADAMS STREET INTERSECTION IMPROVEMENT PROJECT NAME 6018 PROJECT NO. PROJECT LOCATION MAP: PROJECT LOCATION: TAMARACK Northeast corner of Tamarack Avenue and Adams Street. PROJECT DESCRIPTION: Extend the existing sidewalk northerly on Adams Street, replace the existing pedestrian access ramp, relocate the existing signal pole, and install new crosswalk striping. PROJECT NEED: The project is needed to meet requirements of the Americans with Disabilities Act and provide a safe crossing for wheelchair-bound pedestrians. FINANCING: Purpose Design Construction Adm in/Inspection Total Cost= Estimated Cost Funding Source $10,000 GCC $33,000 GCC $5,500 GCC $48,500 Page 223 TRAFCALMDONNA Page 224 CAPITAL PROJECT DESCRIPTION 6026 CIRCULATION SYSTEM STREET PROJECTS – TRAFFIC CALMING DONNA DRIVE PROJECT NO. PROJECT NAME PROJECT LOCATION MAP: PROJECT LOCATION: Along Donna Drive. PROJECT DESCRIPTION: City staff, working with a neighborhood committee, will develop a traffic calming conceptual plan for Donna Drive. The conceptual plan will evaluate various traffic calming methods and possible construction projects. The purpose is to help reduce vehicle speeds as outline in the Carlsbad Residential Traffic Management Program (CRTMP). PROJECT NEED: Residents have completed Phases I and II of the CRTMP. Donna Drive has a 2007 priority ranking of #1 with a total of 44 points. The installation of traffic calming measures will help to reduce vehicle speeds on Donna Drive. FINANCING: Purpose Estimated Cost Funding Source Study $45,000 Gas Tax Design $68,000 Gas Tax Total Cost = $113,000 TRAFCALMSIERRA Page 225 CAPITAL PROJECT DESCRIPTION 6027 CIRCULATION SYSTEM STREET PROJECTS – TRAFFIC CALMING SIERRA MORENA AVENUE PROJECT NO. PROJECT NAME PROJECT LOCATION MAP: PROJECT LOCATION: Along Sierra Morena Avenue. PROJECT DESCRIPTION: City staff, working with a neighborhood committee, will develop a traffic calming conceptual plan for Sierra Morena Avenue. The conceptual plan will evaluate various traffic calming methods and possible construction projects. The purpose is to help reduce vehicle speeds as outline in the Carlsbad Residential Traffic Management Program (CRTMP). PROJECT NEED: Residents have completed Phases I and II of the CRTMP. Sierra Morena has a 2007 priority ranking of #2 with a total of 9 points. The installation of traffic calming measures will help to reduce vehicle speeds on Sierra Morena Avenue. FINANCING: Purpose Estimated Cost Funding Source Study $35,000 Gas Tax Design $55,000 Gas Tax Total Cost = $90,000 CAPITAL PROJECT DESCRIPTION CIRCULATION SYSTEM STREET PROJECTS -TRAFFIC MONITORING PROGRAM PROJECT NAME 6003 PROJECT NO. PROJECT LOCATION MAP: PROJECT LOCATION: N/A TRAFFMON Citywide. PROJECT DESCRIPTION: Perform traffic vehicle counts, analyze and report annually on adequacy of circulation system and identify any intersections or links that fail to meet Growth Management Standards. PROJECT NEED: To ensure that the circulation system meets Growth Management Standards. FINANCING: Purpose Estimated Cost Funding Source Field Counts/Reports $1,718,900 TIF Total Cost= $1,718,900 Annual Expenditures are approximately $96,000. Page 226 CAPITAL PROJECT DESCRIPTION CIRCULATION SYSTEM STREET PROJECTS -UNDERGROUND UTILITY N0.17 (ROOSEVELT STREET} PROJECT NAME 38951 PROJECT NO. PROJECT LOCATION MAP: PROJECT LOCATION: UUD17 Roosevelt Street from Carlsbad Village Drive to Magnolia Avenue. PROJECT DESCRIPTION: Place all overhead utilities underground, including electric, telephone, and cable television lines. Work includes trenching, placing conduit and cable, restoring surface, and removal of existing poles and all overhead lines. PROJECT NEED: This project is identified on the City Council's adopted Underground Priority List. FINANCING: Purpose Estimated Cost Funding Source Design/Construction $850,000 20A Funds (SDG&E) Street Lights $509,800 GCC Total Cost= $1,359,800 20A Funds will be paid to project by SDG&E. Page 227