HomeMy WebLinkAbout; ; 2013-2014 Operating Budget and Capital Improvement Program; 2013-07-01Capital Improvement
Program
2013-20142013-20142013-20142013-20142013-20142013-2014
Operating Budget
and
Overview
Overview
A-1
City Hall
1200 Carlsbad Village Drive ° Carlsbad, CA 92008 ° 760-434-2820 ° 760-720-9461 fax
www.carlsbadca.gov
To the Honorable Mayor and City Council:
2013-14 BUDGET TRANSMITTAL
I am pleased to submit the Fiscal Year 2013-14 Operating Budget and Capital Improvement
Program for the City of Carlsbad. The combined budget totals $259.5 million, with projected
revenues of $264.1 million. Revenues received in prior years will be used to fund some capital
improvement appropriations in 2013-14. Of the total budget, $214.7 million, or 83 percent, will
be used to fund the operations of the city, while $44.7 million, or 17 percent, will go towards
capital improvements throughout Carlsbad. Our goal has been to prepare a comprehensive
financial plan for services, programs, and capital projects that will assist the Council in the
achievement of its vision for Carlsbad.
The financial outlook for the coming fiscal year offers continued optimism, as major revenue
sources, such as sales tax and transient occupancy tax, demonstrate the health of the Carlsbad
business environment. General Fund revenues for FY 2013-14 are anticipated to be $3.7
million, or 3.2 percent, higher than revenues received in the previous fiscal year. General Fund
revenues are forecast to reach $121 million in the coming year and, although we have not
reached the pre-recession high of approximately $123 million, this will be the fourth consecutive
year of revenue growth. This budget represents a continued commitment to deliberate financial
management, as departments provided additional reductions in full-time equivalent positions
and held the line on new programs and expenditures. The budget is structurally balanced for
the long-term, and we project a steadily improving financial picture over the coming years,
although we acknowledge that significant unforeseen events could rapidly alter the economic
environment and our forecast.
Overall, a stabilizing economy is providing a boost to many General Fund revenues, and the
housing marking is showing signs of improvement, bolstering the outlook for revenues
generated from property and development. Property tax revenues have reversed the downward
trend of the past few years and are expected to increase, by 1.5 percent, this year, generating
$48.4 million. Sales tax revenues are expected to increase by 4 percent in the coming year, as
receipts from automobiles and retail sales push revenues back above pre-recession levels.
Transient occupancy tax, or hotel tax, also offers a bright spot in the budget, as revenues from
this source are expected to increase by 6.2 percent, due to additional rooms added over the
past year and improving occupancy and daily room rates for existing hotel rooms.
Overall, the city’s total Operating Budget for FY 2013-14 has increased by $4.4 million, or 2.1
percent, from the previous year. This is partially due to the anticipated opening of Alga Norte
Park, as well as increases in the Water Enterprise Fund, resulting from increases in the cost of
purchasing water and recycled water, and in the Self-Insured Benefits Fund, to address
anticipated future pension rate increases. The General Fund Operating Budget increased by
$4.5 million, or 3.9 percent, as compared to the previous year. The major components of this
increase include a $1.5 million transfer to the General Capital Construction Fund for Village and
Barrio revitalization projects, a $750,000 transfer to the Risk Management fund for increases in
settlements and estimated claims, a $2.0 million contribution to the city’s pension plan in order
A-1
City Hall
1200 Carlsbad Village Drive ° Carlsbad, CA 92008 ° 760-434-2820 ° 760-720-9461 fax
www.carlsbadca.gov
To the Honorable Mayor and City Council:
2013-14 BUDGET TRANSMITTAL
I am pleased to submit the Fiscal Year 2013-14 Operating Budget and Capital Improvement
Program for the City of Carlsbad. The combined budget totals $259.5 million, with projected
revenues of $264.1 million. Revenues received in prior years will be used to fund some capital
improvement appropriations in 2013-14. Of the total budget, $214.7 million, or 83 percent, will
be used to fund the operations of the city, while $44.7 million, or 17 percent, will go towards
capital improvements throughout Carlsbad. Our goal has been to prepare a comprehensive
financial plan for services, programs, and capital projects that will assist the Council in the
achievement of its vision for Carlsbad.
The financial outlook for the coming fiscal year offers continued optimism, as major revenue
sources, such as sales tax and transient occupancy tax, demonstrate the health of the Carlsbad
business environment. General Fund revenues for FY 2013-14 are anticipated to be $3.7
million, or 3.2 percent, higher than revenues received in the previous fiscal year. General Fund
revenues are forecast to reach $121 million in the coming year and, although we have not
reached the pre-recession high of approximately $123 million, this will be the fourth consecutive
year of revenue growth. This budget represents a continued commitment to deliberate financial
management, as departments provided additional reductions in full-time equivalent positions
and held the line on new programs and expenditures. The budget is structurally balanced for
the long-term, and we project a steadily improving financial picture over the coming years,
although we acknowledge that significant unforeseen events could rapidly alter the economic
environment and our forecast.
Overall, a stabilizing economy is providing a boost to many General Fund revenues, and the
housing marking is showing signs of improvement, bolstering the outlook for revenues
generated from property and development. Property tax revenues have reversed the downward
trend of the past few years and are expected to increase, by 1.5 percent, this year, generating
$48.4 million. Sales tax revenues are expected to increase by 4 percent in the coming year, as
receipts from automobiles and retail sales push revenues back above pre-recession levels.
Transient occupancy tax, or hotel tax, also offers a bright spot in the budget, as revenues from
this source are expected to increase by 6.2 percent, due to additional rooms added over the
past year and improving occupancy and daily room rates for existing hotel rooms.
Overall, the city’s total Operating Budget for FY 2013-14 has increased by $4.4 million, or 2.1
percent, from the previous year. This is partially due to the anticipated opening of Alga Norte
Park, as well as increases in the Water Enterprise Fund, resulting from increases in the cost of
purchasing water and recycled water, and in the Self-Insured Benefits Fund, to address
anticipated future pension rate increases. The General Fund Operating Budget increased by
$4.5 million, or 3.9 percent, as compared to the previous year. The major components of this
increase include a $1.5 million transfer to the General Capital Construction Fund for Village and
Barrio revitalization projects, a $750,000 transfer to the Risk Management fund for increases in
settlements and estimated claims, a $2.0 million contribution to the city’s pension plan in order
A-2
to adequately address our liability for future benefits and funding for the operations and
maintenance of Alga Norte Park.
The Adopted Budget provides an additional $44.7 million in the city’s Capital Improvement
Program, which brings total programmed expenditures to $499.5 million for approximately 240
projects to build or improve the city’s roads, parks, water and sewer infrastructure and civic
projects. Some of the more significant projects for the coming year include major renovation and
refurbishment at the Cole and Dove libraries, Village and Barrio revitalization projects which will
provide additional lighting, way finding signage, traffic circles, and streetscape improvements. In
addition, funding for construction of the desalinated seawater transmission main is included in
the coming year.
The City of Carlsbad’s long history of fiscal discipline, along with a well-diversified revenue
base, has helped the city earn a AAA credit rating, the highest possible. The city continues to
maintain best practices in the management of its finances and include long term planning tools
in its forecasting to ensure that decisions made today will also provide positive impact to the city
in the future.
The Adopted Budget continues to provide for the fiscal stability of the city. The FY 2013-14
budget provides funding for maintenance and replacement of aging infrastructure, including
facilities, streets, sidewalks, and drainage. As in past years, Council approved a contribution of
6.5 percent of forecast General Fund revenues to the Infrastructure Replacement Fund, adding
$7.8 million.
In maintaining fiscal stability for the city, the City Council has adopted a responsible General
Fund reserve policy, which ensures that adequate resources are available to mitigate cash
needs that may result from unforeseen events, such as emergencies or natural disasters. The
reserve policy sets a minimum General Fund reserve level of 30 percent of General Fund
operating expenditures and a target of 40 to 50 percent of the General Fund operating
expenditures. The current reserve is projected to be approximately 54 percent of General Fund
operating expenditures for FY 2013-14.
I would like to express my appreciation to the City Council for providing the long-term vision and
support that are crucial for the city to achieve its goals. I would also like to recognize the
contributions of city staff for providing budgetary solutions that allowed us to meet the economic
challenges of the past years, while maintaining the high service levels expected by our
community. The City of Carlsbad is well-positioned to maintain an excellent quality of life for our
residents and a strong economic base for local businesses for years to come.
JOHN COATES
City Manager
A-2
to adequately address our liability for future benefits and funding for the operations and
maintenance of Alga Norte Park.
The Adopted Budget provides an additional $44.7 million in the city’s Capital Improvement
Program, which brings total programmed expenditures to $499.5 million for approximately 240
projects to build or improve the city’s roads, parks, water and sewer infrastructure and civic
projects. Some of the more significant projects for the coming year include major renovation and
refurbishment at the Cole and Dove libraries, Village and Barrio revitalization projects which will
provide additional lighting, way finding signage, traffic circles, and streetscape improvements. In
addition, funding for construction of the desalinated seawater transmission main is included in
the coming year.
The City of Carlsbad’s long history of fiscal discipline, along with a well-diversified revenue
base, has helped the city earn a AAA credit rating, the highest possible. The city continues to
maintain best practices in the management of its finances and include long term planning tools
in its forecasting to ensure that decisions made today will also provide positive impact to the city
in the future.
The Adopted Budget continues to provide for the fiscal stability of the city. The FY 2013-14
budget provides funding for maintenance and replacement of aging infrastructure, including
facilities, streets, sidewalks, and drainage. As in past years, Council approved a contribution of
6.5 percent of forecast General Fund revenues to the Infrastructure Replacement Fund, adding
$7.8 million.
In maintaining fiscal stability for the city, the City Council has adopted a responsible General
Fund reserve policy, which ensures that adequate resources are available to mitigate cash
needs that may result from unforeseen events, such as emergencies or natural disasters. The
reserve policy sets a minimum General Fund reserve level of 30 percent of General Fund
operating expenditures and a target of 40 to 50 percent of the General Fund operating
expenditures. The current reserve is projected to be approximately 54 percent of General Fund
operating expenditures for FY 2013-14.
I would like to express my appreciation to the City Council for providing the long-term vision and
support that are crucial for the city to achieve its goals. I would also like to recognize the
contributions of city staff for providing budgetary solutions that allowed us to meet the economic
challenges of the past years, while maintaining the high service levels expected by our
community. The City of Carlsbad is well-positioned to maintain an excellent quality of life for our
residents and a strong economic base for local businesses for years to come.
JOHN COATES
City Manager
CITY OF CARLSBAD BUDGET HIGHLIGHTS
A-15
FY 2013-14 OPERATING REVENUES
BY FUND TYPE = $220.6 MILLION
OPERATING BUDGET
Revenue
Projections
The city’s operations
are divided into various
funds. Each fund has
been established
because of certain
restrictions placed on
the use of the
resources received by
that fund. Any
unrestricted funds are
placed in the General
Fund. Estimated
revenues for the city’s
five fund types are
shown on the
accompanying graph.
General Fund
The fund receiving the largest slice of the revenues is the General Fund, with estimated
revenues of $121 million for Fiscal Year 2013-14. The General Fund pays for most of the city
services available to city residents. The majority of the General Fund revenues are derived
from taxes. The following graph illustrates the sources of revenue to the General Fund.
FY 2013-14 GENERAL FUND REVENUES = $121 MILLION
Property taxes, at $48.4 million, are the largest General Fund revenue. The city receives only
about 18 percent of the property taxes paid by its citizens. The remainder of the tax goes to the
school districts, the state, and other various agencies. Sales tax is the second largest source of
revenue for the General Fund. Sales taxes are estimated to bring in $31.1 million for Fiscal
General Fund,
$121.0 , 55%
Special
Revenue, $10.7
, 5%
Enterprise,
$69.1 , 31%
Internal
Service, $18.5 ,
8%
Red. Obligation,
$1.3 , 1%
PROPERTY TAX
40%
TRANSFER TAXES
1%SALES TAX26%
BUSINESS LICENSE TAX
3%
LICENSES & PERMITS
1%
CHARGES FOR
SERVICES
5%
OTHER REVENUE5%
INTERGOVERNMENTAL1%
FRANCHISE TAX4%
TRANSIENT TAX12%
INCOME FROM
INVESTMENTS &
PROPERTY
2%
CITY OF CARLSBAD BUDGET HIGHLIGHTS
A-15
FY 2013-14 OPERATING REVENUES
BY FUND TYPE = $220.6 MILLION
OPERATING BUDGET
Revenue
Projections
The city’s operations
are divided into various
funds. Each fund has
been established
because of certain
restrictions placed on
the use of the
resources received by
that fund. Any
unrestricted funds are
placed in the General
Fund. Estimated
revenues for the city’s
five fund types are
shown on the
accompanying graph.
General Fund
The fund receiving the largest slice of the revenues is the General Fund, with estimated
revenues of $121 million for Fiscal Year 2013-14. The General Fund pays for most of the city
services available to city residents. The majority of the General Fund revenues are derived
from taxes. The following graph illustrates the sources of revenue to the General Fund.
FY 2013-14 GENERAL FUND REVENUES = $121 MILLION
Property taxes, at $48.4 million, are the largest General Fund revenue. The city receives only
about 18 percent of the property taxes paid by its citizens. The remainder of the tax goes to the
school districts, the state, and other various agencies. Sales tax is the second largest source of
revenue for the General Fund. Sales taxes are estimated to bring in $31.1 million for Fiscal
General Fund,
$121.0 , 55%
Special
Revenue, $10.7
, 5%
Enterprise,
$69.1 , 31%
Internal
Service, $18.5 ,
8%
Red. Obligation,
$1.3 , 1%
PROPERTY TAX
40%
TRANSFER TAXES
1%SALES TAX26%
BUSINESS LICENSE TAX
3%
LICENSES & PERMITS
1%
CHARGES FOR
SERVICES
5%
OTHER REVENUE5%
INTERGOVERNMENTAL1%
FRANCHISE TAX4%
TRANSIENT TAX12%
INCOME FROM
INVESTMENTS &
PROPERTY
2%
CITY OF CARLSBAD BUDGET HIGHLIGHTS
A-16
Year 2013-14. Automobile and retail sales are the most significant contributors to the category
of sales tax.
Transient occupancy taxes (hotel taxes) are estimated at $14.7 million and represent the third
largest revenue source for the city. Franchise taxes, transfer taxes, and business license taxes
make up the remaining $9.8 million in tax revenues estimated to be collected in Fiscal Year
2013-14.
Intergovernmental revenues are revenues collected by the State and other governmental
agencies and allocated to the city based on a formula. Examples of intergovernmental
revenues include motor vehicle license fees, State mandated cost reimbursements, and
homeowner’s exemptions. Intergovernmental revenues are estimated at approximately $1
million for the upcoming year.
Licenses and permits account for $1.6 million of the General Fund revenues and include
building permits and other development-related permits. Charges for services are estimated to
be $6.6 million and include fees for engineering, planning, building, recreation, and ambulance
services. Income from investments and property are estimated at $2.2 million.
Other General Fund revenue sources include charges collected from other departments, fines
and forfeitures, and miscellaneous revenues. Those sources total $4.8 million.
Special Revenue Funds
Revenues from Special Revenue funds are estimated at $10.7 million for Fiscal Year 2013-14.
Funds collected in this category are legally restricted to specified purposes. Examples of
funding resources include donations, grants, and special assessments. The types of functions
supported with Special Revenue funds include programs such as Section 8 Housing Assistance,
Housing Trust Fund, Community Development Block Grants (CDBG), and maintenance and
assessment districts.
Enterprise Funds
Enterprise funds revenues make up the second largest revenue group, totaling $69 million.
Enterprise funds operate similar to a business in that they charge fees to cover the cost of their
services. Examples of the city’s enterprises include water and wastewater services and solid
waste management. This fund group also includes operations of the city’s municipal golf
course, The Crossings at Carlsbad.
Internal Service Funds
Internal Service fund revenues, projected to be $18.5 million, are derived from charges to the
city programs that benefit from the services rendered. The funds collected must be used
specifically to support the internal service. Examples of the city’s Internal Service funds include
General Liability, Self-Insured Benefits, Information Technology, Workers’ Compensation, and
Vehicle Maintenance and Replacement.
Redevelopment Obligation Retirement Funds
The Redevelopment Obligation Retirement Fund (RORF) revenues are expected to total $1.3
million in the upcoming year. On June 29, 2011, California Governor Jerry Brown signed ABX1
26 to dissolve all redevelopment agencies within the State of California. All agencies were
subsequently dissolved as of February 1, 2012, and a Successor Agency was designated to
complete the work of the Carlsbad Redevelopment Agency (RDA) and satisfy the financial
obligations. A Recognized Obligation Payment Schedule (ROPS) was prepared by the
Successor Agency in April 2012 which must ultimately be approved by the Oversight Board, the
County of San Diego and the State of California. The initial ROPS identified financial
commitments of the former RDA which will be paid from semi-annual tax increment revenue
received by the Successor Agency. Every six months a new ROPS must be prepared and
CITY OF CARLSBAD BUDGET HIGHLIGHTS
A-16
Year 2013-14. Automobile and retail sales are the most significant contributors to the category
of sales tax.
Transient occupancy taxes (hotel taxes) are estimated at $14.7 million and represent the third
largest revenue source for the city. Franchise taxes, transfer taxes, and business license taxes
make up the remaining $9.8 million in tax revenues estimated to be collected in Fiscal Year
2013-14.
Intergovernmental revenues are revenues collected by the State and other governmental
agencies and allocated to the city based on a formula. Examples of intergovernmental
revenues include motor vehicle license fees, State mandated cost reimbursements, and
homeowner’s exemptions. Intergovernmental revenues are estimated at approximately $1
million for the upcoming year.
Licenses and permits account for $1.6 million of the General Fund revenues and include
building permits and other development-related permits. Charges for services are estimated to
be $6.6 million and include fees for engineering, planning, building, recreation, and ambulance
services. Income from investments and property are estimated at $2.2 million.
Other General Fund revenue sources include charges collected from other departments, fines
and forfeitures, and miscellaneous revenues. Those sources total $4.8 million.
Special Revenue Funds
Revenues from Special Revenue funds are estimated at $10.7 million for Fiscal Year 2013-14.
Funds collected in this category are legally restricted to specified purposes. Examples of
funding resources include donations, grants, and special assessments. The types of functions
supported with Special Revenue funds include programs such as Section 8 Housing Assistance,
Housing Trust Fund, Community Development Block Grants (CDBG), and maintenance and
assessment districts.
Enterprise Funds
Enterprise funds revenues make up the second largest revenue group, totaling $69 million.
Enterprise funds operate similar to a business in that they charge fees to cover the cost of their
services. Examples of the city’s enterprises include water and wastewater services and solid
waste management. This fund group also includes operations of the city’s municipal golf
course, The Crossings at Carlsbad.
Internal Service Funds
Internal Service fund revenues, projected to be $18.5 million, are derived from charges to the
city programs that benefit from the services rendered. The funds collected must be used
specifically to support the internal service. Examples of the city’s Internal Service funds include
General Liability, Self-Insured Benefits, Information Technology, Workers’ Compensation, and
Vehicle Maintenance and Replacement.
Redevelopment Obligation Retirement Funds
The Redevelopment Obligation Retirement Fund (RORF) revenues are expected to total $1.3
million in the upcoming year. On June 29, 2011, California Governor Jerry Brown signed ABX1
26 to dissolve all redevelopment agencies within the State of California. All agencies were
subsequently dissolved as of February 1, 2012, and a Successor Agency was designated to
complete the work of the Carlsbad Redevelopment Agency (RDA) and satisfy the financial
obligations. A Recognized Obligation Payment Schedule (ROPS) was prepared by the
Successor Agency in April 2012 which must ultimately be approved by the Oversight Board, the
County of San Diego and the State of California. The initial ROPS identified financial
commitments of the former RDA which will be paid from semi-annual tax increment revenue
received by the Successor Agency. Every six months a new ROPS must be prepared and
CITY OF CARLSBAD BUDGET HIGHLIGHTS
A-17
approved by the Oversight Board, the County of San Diego and the State of California in order
to receive additional tax increment. Due to the dissolving of the RDA, the RORF will only
receive tax increment revenues and interest earnings on any cash balances. Tax increment
revenues are projected to decrease due to the increase in County of San Diego administrative
costs which are netted against the tax increment revenues received by the Successor Agency.
Operating Budget By Program
The total Operating Budget adopted for the city for FY 2013-14 equals $214.7 million, which is
approximately 2.1 percent higher than the Operating Budget adopted for FY 2012-13. The
Operating Budget includes funding for the General Fund as well as all other city funds, and can
be categorized by main functional area. Six main functional areas that represent the key
businesses of the city have been identified, as well as a Non-Departmental component which
includes fund transfers as well as items that benefit the city as a whole. The graph below shows
the percentage of the Operating Budget applicable to each of the functional areas.
FY 2013-14 OPERATING BUDGET = $214.7 MILLION
Total funding allocated for the Policy and Leadership Group for 2013-14 is $4.4 million. This
group encompasses all elected officials and the chief executive offices for the city. These
include the offices of the City Council, City Manager, City Clerk, City Attorney, City Treasurer,
and the communications department.
Administrative Services, with a budget of $19.9 million, includes finance, purchasing, human
resources, information technology, records management, self-insured benefits, risk
management, and workers’ compensation. These areas mainly provide services to internal city
departments.
Public Safety services are funded at $46.9 million and include all of the police and fire
programs such as police patrol, vice/narcotics, juvenile diversion and DARE programs, fire
emergency operations, fire prevention and emergency preparedness.
Community and Economic Development, with a budget of $15.7 million, provide the services
that guide and oversee the planning and development of Carlsbad as depicted in the city's
General Plan. The General Plan is the base document that expresses the goals and public
policy relative to future land use. It acts as a "constitution" for development and is the
Policy & Leadership
2%
Administrative
Services
9%Community
Development
7%
Community
Services
15%
Public Safety
22%
Public Works
37%
Non-departmental
8%
CITY OF CARLSBAD BUDGET HIGHLIGHTS
A-17
approved by the Oversight Board, the County of San Diego and the State of California in order
to receive additional tax increment. Due to the dissolving of the RDA, the RORF will only
receive tax increment revenues and interest earnings on any cash balances. Tax increment
revenues are projected to decrease due to the increase in County of San Diego administrative
costs which are netted against the tax increment revenues received by the Successor Agency.
Operating Budget By Program
The total Operating Budget adopted for the city for FY 2013-14 equals $214.7 million, which is
approximately 2.1 percent higher than the Operating Budget adopted for FY 2012-13. The
Operating Budget includes funding for the General Fund as well as all other city funds, and can
be categorized by main functional area. Six main functional areas that represent the key
businesses of the city have been identified, as well as a Non-Departmental component which
includes fund transfers as well as items that benefit the city as a whole. The graph below shows
the percentage of the Operating Budget applicable to each of the functional areas.
FY 2013-14 OPERATING BUDGET = $214.7 MILLION
Total funding allocated for the Policy and Leadership Group for 2013-14 is $4.4 million. This
group encompasses all elected officials and the chief executive offices for the city. These
include the offices of the City Council, City Manager, City Clerk, City Attorney, City Treasurer,
and the communications department.
Administrative Services, with a budget of $19.9 million, includes finance, purchasing, human
resources, information technology, records management, self-insured benefits, risk
management, and workers’ compensation. These areas mainly provide services to internal city
departments.
Public Safety services are funded at $46.9 million and include all of the police and fire
programs such as police patrol, vice/narcotics, juvenile diversion and DARE programs, fire
emergency operations, fire prevention and emergency preparedness.
Community and Economic Development, with a budget of $15.7 million, provide the services
that guide and oversee the planning and development of Carlsbad as depicted in the city's
General Plan. The General Plan is the base document that expresses the goals and public
policy relative to future land use. It acts as a "constitution" for development and is the
Policy & Leadership
2%
Administrative
Services
9%Community
Development
7%
Community
Services
15%
Public Safety
22%
Public Works
37%
Non-departmental
8%
CITY OF CARLSBAD BUDGET HIGHLIGHTS
A-18
foundation upon which all land use decisions are based. Also included under Community
Development are building and code enforcement, volunteer programs, and providing for housing
and neighborhood services.
Community Services, with a budget of $32.7 million, consists of library and cultural arts, parks
and recreation, and seniors programs. Included in this area is the enterprise fund for operations
of the municipal golf course, The Crossings at Carlsbad. These programs are provided to a
wide range of people and assist in their education, health and well-being, and cultural
development.
The functional area requiring the largest amount of funds is Public Works, with a budget of
$78.4 million. Public Works is responsible for the provision of utility services as well as the
building and maintenance of all of the city’s streets and roadways. It is comprised of the water,
sewer, and solid waste enterprise funds, as well as the Transportation Department and lighting
and landscaping special assessment districts.
The Non-Departmental and Contingency funding is $16.7 million and includes transfers to
other funds, programs benefiting the city as a whole, such as community promotions,
community contributions, assessment services, and the City Council’s contingency account.
Included in the non-departmental group is a $7.8 million transfer to the Infrastructure
Replacement Fund. This program sets aside funds for the replacement of the city’s base
infrastructure. Also included are a $2 million transfer to the city’s self-insured benefits fund to
assist with anticipated future pension rate increases, and a $1.4 million transfer for Village and
Barrio revitalization projects. The City Council contingency account, which is available for
emergencies and unforeseen program needs that arise during the year, is budgeted at $1.5
million. The contingency account amounts to 1.2 percent of the FY 2013-14 General Fund
budget.
Staffing
The FY 2013-14 Operating Budget reflects a total net decrease of 6.75 full-time positions, and
an increase of part-time staff totaling 18 hourly full-time equivalent (FTE) positions. These
changes result in a city workforce of 667.75 full and three-quarter time employees and 150.58
hourly FTE. The staffing changes in each of the city’s programs are discussed more fully in the
Operating Budget Overview.
CAPITAL IMPROVEMENT PROGRAM
The City of Carlsbad’s Capital Improvement Program (CIP) is a long-range planning document,
which outlines the expenditure plan for current and future capital projects and the corresponding
revenues to pay for those expenditures. Projects in the CIP consist primarily of new construction
or major maintenance and replacement of city facilities such as parks, roads, civic facilities such
as libraries, police and fire stations, and sewer, water, and drainage facilities. The Capital
Improvement Program for 2013-14 totals $44.7 million in new appropriations and an estimated
$170.1 million in continuing appropriations, for a total appropriation of $214.8 million.
Some of the notable capital projects which are planned in the next five years are discussed on
the following pages.
Park Development Projects
Alga Norte Community Park and Aquatic Center – Completion of this park, located on 32 acres
in the Southeast Quadrant along Poinsettia Lane between El Camino Real and Alicante Road is
expected towards the end of calendar year 2013.
CITY OF CARLSBAD BUDGET HIGHLIGHTS
A-18
foundation upon which all land use decisions are based. Also included under Community
Development are building and code enforcement, volunteer programs, and providing for housing
and neighborhood services.
Community Services, with a budget of $32.7 million, consists of library and cultural arts, parks
and recreation, and seniors programs. Included in this area is the enterprise fund for operations
of the municipal golf course, The Crossings at Carlsbad. These programs are provided to a
wide range of people and assist in their education, health and well-being, and cultural
development.
The functional area requiring the largest amount of funds is Public Works, with a budget of
$78.4 million. Public Works is responsible for the provision of utility services as well as the
building and maintenance of all of the city’s streets and roadways. It is comprised of the water,
sewer, and solid waste enterprise funds, as well as the Transportation Department and lighting
and landscaping special assessment districts.
The Non-Departmental and Contingency funding is $16.7 million and includes transfers to
other funds, programs benefiting the city as a whole, such as community promotions,
community contributions, assessment services, and the City Council’s contingency account.
Included in the non-departmental group is a $7.8 million transfer to the Infrastructure
Replacement Fund. This program sets aside funds for the replacement of the city’s base
infrastructure. Also included are a $2 million transfer to the city’s self-insured benefits fund to
assist with anticipated future pension rate increases, and a $1.4 million transfer for Village and
Barrio revitalization projects. The City Council contingency account, which is available for
emergencies and unforeseen program needs that arise during the year, is budgeted at $1.5
million. The contingency account amounts to 1.2 percent of the FY 2013-14 General Fund
budget.
Staffing
The FY 2013-14 Operating Budget reflects a total net decrease of 6.75 full-time positions, and
an increase of part-time staff totaling 18 hourly full-time equivalent (FTE) positions. These
changes result in a city workforce of 667.75 full and three-quarter time employees and 150.58
hourly FTE. The staffing changes in each of the city’s programs are discussed more fully in the
Operating Budget Overview.
CAPITAL IMPROVEMENT PROGRAM
The City of Carlsbad’s Capital Improvement Program (CIP) is a long-range planning document,
which outlines the expenditure plan for current and future capital projects and the corresponding
revenues to pay for those expenditures. Projects in the CIP consist primarily of new construction
or major maintenance and replacement of city facilities such as parks, roads, civic facilities such
as libraries, police and fire stations, and sewer, water, and drainage facilities. The Capital
Improvement Program for 2013-14 totals $44.7 million in new appropriations and an estimated
$170.1 million in continuing appropriations, for a total appropriation of $214.8 million.
Some of the notable capital projects which are planned in the next five years are discussed on
the following pages.
Park Development Projects
Alga Norte Community Park and Aquatic Center – Completion of this park, located on 32 acres
in the Southeast Quadrant along Poinsettia Lane between El Camino Real and Alicante Road is
expected towards the end of calendar year 2013.
CITY OF CARLSBAD BUDGET HIGHLIGHTS
A-19
Amenities include:
x A 56 meter Olympic sized competition pool with viewing bleachers
x A 25 meter, 12 lane swim instruction pool
x A 10 by 25 foot therapeutic pool with jets
x A 22 foot diameter 6 inch deep kids pool
x A “spray-ground” play area for young children
x Three lighted softball/baseball fields
x One lighted full basketball court and one half court
x Batting cages and a concession stand at the ball fields
x Picnic areas with barbecues
x Playground with 100 percent universally accessible play equipment
x An off-leash dog park divided into areas for larger and smaller dogs, including obstacle
course-type play equipment
x A 18,500-square-foot lighted skate park that will include a "street course" section, an
area with challenging elements for more skilled skateboarders and a beginners’ area
Leo Carrillo Phase III – Phase III includes the renovation of additional buildings, construction of
additional restrooms and an arboretum area. The total cost of the remainder of Phase III is
approximately $1.9 million and design is expected to begin in FY 2016-17.
Civic Facilities
Civic facilities include a variety of facilities from which
the city can offer its services to the public.
Fire Station No. 3 Relocation – Fire Station No. 3 is
currently located at the corner of Chestnut and
Catalina. As the city grows eastward, relocation of
this station is needed to help ensure a six minute
response time. The land was previously acquired in
the Robertson Ranch site, and the remaining
construction cost is estimated at $9.4 million.
Library Renovation Projects – Significant renovation projects are planned at the Dove and the
Cole libraries. Improvements are designed to accommodate current staffing needs, meet patron
demands for modern library services and allow for better wireless and communications services
for the public. The estimated renovation cost for both libraries is $3 million.
Facilities Maintenance – As the city facilities begin to age, maintenance and repair projects are
needed to keep them in good condition. Twelve projects have currently been identified at a total
cost of about $8.3 million. Included are major refurbishment projects at the Cole and Dove
libraries which will be constructed in conjunction with the renovation projects mentioned above,
as well as synthetic turf replacement at Poinsettia Park soccer fields.
Village and Barrio Area Projects – There are seven new projects proposed this next year for
making improvements to the downtown Village Area and Barrio neighborhoods. The projects
include bike and pedestrian way finding signage and traffic circles, decorative lighting, parking
way finding, safety lighting, and streetscape improvements.
CITY OF CARLSBAD BUDGET HIGHLIGHTS
A-19
Amenities include:
x A 56 meter Olympic sized competition pool with viewing bleachers
x A 25 meter, 12 lane swim instruction pool
x A 10 by 25 foot therapeutic pool with jets
x A 22 foot diameter 6 inch deep kids pool
x A “spray-ground” play area for young children
x Three lighted softball/baseball fields
x One lighted full basketball court and one half court
x Batting cages and a concession stand at the ball fields
x Picnic areas with barbecues
x Playground with 100 percent universally accessible play equipment
x An off-leash dog park divided into areas for larger and smaller dogs, including obstacle
course-type play equipment
x A 18,500-square-foot lighted skate park that will include a "street course" section, an
area with challenging elements for more skilled skateboarders and a beginners’ area
Leo Carrillo Phase III – Phase III includes the renovation of additional buildings, construction of
additional restrooms and an arboretum area. The total cost of the remainder of Phase III is
approximately $1.9 million and design is expected to begin in FY 2016-17.
Civic Facilities
Civic facilities include a variety of facilities from which
the city can offer its services to the public.
Fire Station No. 3 Relocation – Fire Station No. 3 is
currently located at the corner of Chestnut and
Catalina. As the city grows eastward, relocation of
this station is needed to help ensure a six minute
response time. The land was previously acquired in
the Robertson Ranch site, and the remaining
construction cost is estimated at $9.4 million.
Library Renovation Projects – Significant renovation projects are planned at the Dove and the
Cole libraries. Improvements are designed to accommodate current staffing needs, meet patron
demands for modern library services and allow for better wireless and communications services
for the public. The estimated renovation cost for both libraries is $3 million.
Facilities Maintenance – As the city facilities begin to age, maintenance and repair projects are
needed to keep them in good condition. Twelve projects have currently been identified at a total
cost of about $8.3 million. Included are major refurbishment projects at the Cole and Dove
libraries which will be constructed in conjunction with the renovation projects mentioned above,
as well as synthetic turf replacement at Poinsettia Park soccer fields.
Village and Barrio Area Projects – There are seven new projects proposed this next year for
making improvements to the downtown Village Area and Barrio neighborhoods. The projects
include bike and pedestrian way finding signage and traffic circles, decorative lighting, parking
way finding, safety lighting, and streetscape improvements.
CITY OF CARLSBAD BUDGET HIGHLIGHTS
A-20
Street and Circulation Projects
Livable Streets continues to be a top Council priority. To help improve the flow of traffic
throughout Carlsbad and to keep the city’s street and pedestrian ways in top condition, there are
a number of projects planned in the next five years. Some of the larger projects are listed
below:
Traffic Signal Program – In keeping with the City Council’s goal of
improving traffic flow, the FY 2013-14 CIP includes the continuation of
the Traffic Signal Program project. This project will upgrade traffic signal
hardware and software in conjunction with the creation of a
communications network that will be used to manage traffic signal
operations and thereby improve the flow of traffic.
Another area of focus is a concept called “complete streets” which uses
street design to create a sense of place and community through green
spaces, medians and signage, while encouraging a healthier, less vehicle
dependent lifestyle. The City Council identified complete streets as a top priority. One project
which incorporates these concepts could begin this fall with construction of a traffic circle
“roundabout” along the northern end of Carlsbad Boulevard next to Buena Vista Lagoon,
making it easier for vehicles, pedestrians and bicyclists to move through the intersection.
ADA Improvements – ADA projects throughout the city are scheduled for $1.3 million in funding
over the next five years. The project includes various accessibility improvements, including
sidewalk curb ramps and pedestrian signals.
Avenida Encinas Widening – Widening to full secondary arterial standards along Avenida
Encinas from Palomar Airport Road to just south of Embarcadero Lane is scheduled for design
in FY 2014-15. The CIP includes $5.2 million to fund this project in the next five years.
Carlsbad Boulevard Bridge Concrete Barriers – Installation of a concrete barriers on the existing
bridges located on Carlsbad Boulevard are planned at a total cost of about $2.3 million,
primarily funded through a federal grant. The bridges are located north of Cannon Road over
the power plant outlet channel, and over the railroad tracks south of State Street.
El Camino Real Widening – There are a number of projects that are scheduled over the next
five years that will focus on the widening of El Camino Real to prime arterial roadway standards,
in addition to other improvements. The projects include widening from Cassia Road to Camino
Vida Roble, Arenal Road to La Costa Avenue, Lisa Street to Crestview Drive and Tamarack to
Chestnut. In the next five years, $5.9 million in additional funding is included for these projects.
Pavement Management – Carlsbad’s local streets are maintained on a regular cycle to ensure a
good riding surface and to extend the life of the streets. Part of the maintenance program is the
sealing and overlay of the existing street surface. In addition, any problem areas are
addressed as they are identified. The FY 2013-14 CIP has $18.5 million budgeted in the next
five years for this program.
Parking Lot Maintenance Program – Parking lot maintenance is a new program scheduled to
begin in FY 2013-14 at a total cost of $1.5 million in the next five years.
CITY OF CARLSBAD BUDGET HIGHLIGHTS
A-20
Street and Circulation Projects
Livable Streets continues to be a top Council priority. To help improve the flow of traffic
throughout Carlsbad and to keep the city’s street and pedestrian ways in top condition, there are
a number of projects planned in the next five years. Some of the larger projects are listed
below:
Traffic Signal Program – In keeping with the City Council’s goal of
improving traffic flow, the FY 2013-14 CIP includes the continuation of
the Traffic Signal Program project. This project will upgrade traffic signal
hardware and software in conjunction with the creation of a
communications network that will be used to manage traffic signal
operations and thereby improve the flow of traffic.
Another area of focus is a concept called “complete streets” which uses
street design to create a sense of place and community through green
spaces, medians and signage, while encouraging a healthier, less vehicle
dependent lifestyle. The City Council identified complete streets as a top priority. One project
which incorporates these concepts could begin this fall with construction of a traffic circle
“roundabout” along the northern end of Carlsbad Boulevard next to Buena Vista Lagoon,
making it easier for vehicles, pedestrians and bicyclists to move through the intersection.
ADA Improvements – ADA projects throughout the city are scheduled for $1.3 million in funding
over the next five years. The project includes various accessibility improvements, including
sidewalk curb ramps and pedestrian signals.
Avenida Encinas Widening – Widening to full secondary arterial standards along Avenida
Encinas from Palomar Airport Road to just south of Embarcadero Lane is scheduled for design
in FY 2014-15. The CIP includes $5.2 million to fund this project in the next five years.
Carlsbad Boulevard Bridge Concrete Barriers – Installation of a concrete barriers on the existing
bridges located on Carlsbad Boulevard are planned at a total cost of about $2.3 million,
primarily funded through a federal grant. The bridges are located north of Cannon Road over
the power plant outlet channel, and over the railroad tracks south of State Street.
El Camino Real Widening – There are a number of projects that are scheduled over the next
five years that will focus on the widening of El Camino Real to prime arterial roadway standards,
in addition to other improvements. The projects include widening from Cassia Road to Camino
Vida Roble, Arenal Road to La Costa Avenue, Lisa Street to Crestview Drive and Tamarack to
Chestnut. In the next five years, $5.9 million in additional funding is included for these projects.
Pavement Management – Carlsbad’s local streets are maintained on a regular cycle to ensure a
good riding surface and to extend the life of the streets. Part of the maintenance program is the
sealing and overlay of the existing street surface. In addition, any problem areas are
addressed as they are identified. The FY 2013-14 CIP has $18.5 million budgeted in the next
five years for this program.
Parking Lot Maintenance Program – Parking lot maintenance is a new program scheduled to
begin in FY 2013-14 at a total cost of $1.5 million in the next five years.
CITY OF CARLSBAD BUDGET HIGHLIGHTS
A-21
Water and Wastewater Projects
The city’s water and wastewater projects are vital to the continued health and welfare of its
citizens. Most new lines are built and paid for by developers. As the city ages, it will become
necessary to repair and replace the lines that already exist, and an increase in these projects is
anticipated in future years. In the next five years, an additional $105.4 million in funding is
scheduled for both new and replacement water and sewer projects.
Vista/Carlsbad Interceptor & Agua Hedionda Lift Station Replacement – This project consists of
a set of individual projects that will ultimately construct a parallel sewer interceptor system to
accommodate existing and future sewer flows from the cities of Vista and Carlsbad. The
individual projects include a main in Jefferson Street, replacement of the Agua Hedionda Lift
Station, and a main from the lift station to the Encina Wastewater Facility. The overall total cost
estimate for this set of projects totals $56.2 million, of which an estimated $17.5 million is to be
funded by the City of Carlsbad, with the remaining $38.7 million to be funded by the City of
Vista.
Wastewater
Other major wastewater facilities scheduled for construction or replacement within the next five
years include:
x Buena Interceptor Sewer Improvements
x Faraday/El Camino Real Sewer Replacement
x Foxes Landing Lift Station and Forcemain
x Las Palmas Trunk Sewer
x Poinsettia Lane Lift Station Emergency Overflow Basin
x Quarry Creek Sewer Extension
x Terra Mar Sewer Replacement
Water Lines
Major water facilities scheduled for construction or replacement within the next five years
include the following locations:
x Aviara Parkway and Plum Tree
x Carlsbad Boulevard – South of Avenida Encinas
x College Boulevard – Cannon Road to Badger Lane
x Desalinated Seawater Transmission Main
x Fire Flow System Improvements
x Hydroelectric Generator at Palomar Airport Road
x La Costa High Reservoir Inlet Pipeline
x Maerkle Reservoir Floating Cover Replacement
x Tri-agencies Water Transmission Pipeline Replacements
Recycled Water Expansion
Expansion to the Carlsbad Water Recycling Facility, including construction of additional
pipelines and a reservoir, are anticipated to cost $29.4 million over the next five years.
CITY OF CARLSBAD BUDGET HIGHLIGHTS
A-21
Water and Wastewater Projects
The city’s water and wastewater projects are vital to the continued health and welfare of its
citizens. Most new lines are built and paid for by developers. As the city ages, it will become
necessary to repair and replace the lines that already exist, and an increase in these projects is
anticipated in future years. In the next five years, an additional $105.4 million in funding is
scheduled for both new and replacement water and sewer projects.
Vista/Carlsbad Interceptor & Agua Hedionda Lift Station Replacement – This project consists of
a set of individual projects that will ultimately construct a parallel sewer interceptor system to
accommodate existing and future sewer flows from the cities of Vista and Carlsbad. The
individual projects include a main in Jefferson Street, replacement of the Agua Hedionda Lift
Station, and a main from the lift station to the Encina Wastewater Facility. The overall total cost
estimate for this set of projects totals $56.2 million, of which an estimated $17.5 million is to be
funded by the City of Carlsbad, with the remaining $38.7 million to be funded by the City of
Vista.
Wastewater
Other major wastewater facilities scheduled for construction or replacement within the next five
years include:
x Buena Interceptor Sewer Improvements
x Faraday/El Camino Real Sewer Replacement
x Foxes Landing Lift Station and Forcemain
x Las Palmas Trunk Sewer
x Poinsettia Lane Lift Station Emergency Overflow Basin
x Quarry Creek Sewer Extension
x Terra Mar Sewer Replacement
Water Lines
Major water facilities scheduled for construction or replacement within the next five years
include the following locations:
x Aviara Parkway and Plum Tree
x Carlsbad Boulevard – South of Avenida Encinas
x College Boulevard – Cannon Road to Badger Lane
x Desalinated Seawater Transmission Main
x Fire Flow System Improvements
x Hydroelectric Generator at Palomar Airport Road
x La Costa High Reservoir Inlet Pipeline
x Maerkle Reservoir Floating Cover Replacement
x Tri-agencies Water Transmission Pipeline Replacements
Recycled Water Expansion
Expansion to the Carlsbad Water Recycling Facility, including construction of additional
pipelines and a reservoir, are anticipated to cost $29.4 million over the next five years.
CITY OF CARLSBAD BUDGET HIGHLIGHTS
A-22
Drainage Projects
The city’s drainage infrastructure plays an important role in handling storm water runoff flows, as
well as maintaining the water quality of the city’s creeks, lagoons and ocean. Carlsbad supports
programs that will ensure that all water bodies within the city are safe and clean and, where
possible, open to the public at all times. The system consists of drainage pipes 30-inches or
larger in diameter, large concrete and rock lined channels, permanent sedimentation basins and
miscellaneous large facilities. As the city continues to age, it will become necessary to repair
and replace the lines that already exist. An increase in these projects is anticipated in future
years.
Northwest Quadrant and Park Drive Drainage Improvements – The next five years include
continued improvements to drainage systems in the older parts of Carlsbad, particularly the
northwest quadrant, with an additional $3.6 million programed.
SUMMARY
The FY 2013-14 budget was prepared against the backdrop of an improving economy,
especially at the regional level. City revenues, especially those derived from taxable sales and
tourism, are expected to continue improving over the coming year. Increasing revenues,
coupled with the ongoing effects of budget reductions implemented in past years, positions
Carlsbad to benefit from future improvements in economic conditions. The city is also in the
midst of a comprehensive review of our service delivery methods, and is focused on providing
services at the best value, identifying services that can be provided in a more efficient manner
by the city or outsourced to private vendors.
National, state, and local economies showed improvements in the past year, but the slow
recovery could face challenges, from instability in Europe to the domestic uncertainty
surrounding future tax rates in the United States. Unemployment rates are improving, and
housing markets are showing significant improvement, resulting in a more positive outlook for
the foreseeable future. Although our forecast reflects improving conditions in the coming years,
the FY 2013-14 budget maintains fiscal discipline as exercised by the city over the past several
years.
The City of Carlsbad continues to exercise fiscal responsibility. The city continues to plan for
the long-term and uses a ten-year financial forecast in creating the budget. This long-term
planning tool allows us to model the effects of ongoing fiscal impacts from new facilities,
economic conditions, and changes in personnel costs. The FY 2013-14 budget presents our
continued dedication to the provision of excellent city services and the quality of life valued by
those who live, work and play in Carlsbad.
DEBT MANAGEMENT ISSUES
The use of debt has always been a primary issue in the development of the Capital
Improvement Program and the policies to implement the Growth Management Program. Over
the years, the city has issued millions of dollars of bonds and Certificates of Participation
(COPs) to fund streets, buildings, sewer and water facilities, open space acquisitions, and other
infrastructure projects. The city is continually evaluating its outstanding debt as well as potential
future issues to ensure that interest costs are kept at a minimum and the use of the bond funds
is appropriate.
Under state finance law, the city’s outstanding general obligation debt may not exceed 15
percent (as adjusted by 25 percent, per the law) of total assessed property value. By law, the
general obligation debt subject to the limitation may be offset by amounts set aside for repaying
CITY OF CARLSBAD BUDGET HIGHLIGHTS
A-22
Drainage Projects
The city’s drainage infrastructure plays an important role in handling storm water runoff flows, as
well as maintaining the water quality of the city’s creeks, lagoons and ocean. Carlsbad supports
programs that will ensure that all water bodies within the city are safe and clean and, where
possible, open to the public at all times. The system consists of drainage pipes 30-inches or
larger in diameter, large concrete and rock lined channels, permanent sedimentation basins and
miscellaneous large facilities. As the city continues to age, it will become necessary to repair
and replace the lines that already exist. An increase in these projects is anticipated in future
years.
Northwest Quadrant and Park Drive Drainage Improvements – The next five years include
continued improvements to drainage systems in the older parts of Carlsbad, particularly the
northwest quadrant, with an additional $3.6 million programed.
SUMMARY
The FY 2013-14 budget was prepared against the backdrop of an improving economy,
especially at the regional level. City revenues, especially those derived from taxable sales and
tourism, are expected to continue improving over the coming year. Increasing revenues,
coupled with the ongoing effects of budget reductions implemented in past years, positions
Carlsbad to benefit from future improvements in economic conditions. The city is also in the
midst of a comprehensive review of our service delivery methods, and is focused on providing
services at the best value, identifying services that can be provided in a more efficient manner
by the city or outsourced to private vendors.
National, state, and local economies showed improvements in the past year, but the slow
recovery could face challenges, from instability in Europe to the domestic uncertainty
surrounding future tax rates in the United States. Unemployment rates are improving, and
housing markets are showing significant improvement, resulting in a more positive outlook for
the foreseeable future. Although our forecast reflects improving conditions in the coming years,
the FY 2013-14 budget maintains fiscal discipline as exercised by the city over the past several
years.
The City of Carlsbad continues to exercise fiscal responsibility. The city continues to plan for
the long-term and uses a ten-year financial forecast in creating the budget. This long-term
planning tool allows us to model the effects of ongoing fiscal impacts from new facilities,
economic conditions, and changes in personnel costs. The FY 2013-14 budget presents our
continued dedication to the provision of excellent city services and the quality of life valued by
those who live, work and play in Carlsbad.
DEBT MANAGEMENT ISSUES
The use of debt has always been a primary issue in the development of the Capital
Improvement Program and the policies to implement the Growth Management Program. Over
the years, the city has issued millions of dollars of bonds and Certificates of Participation
(COPs) to fund streets, buildings, sewer and water facilities, open space acquisitions, and other
infrastructure projects. The city is continually evaluating its outstanding debt as well as potential
future issues to ensure that interest costs are kept at a minimum and the use of the bond funds
is appropriate.
Under state finance law, the city’s outstanding general obligation debt may not exceed 15
percent (as adjusted by 25 percent, per the law) of total assessed property value. By law, the
general obligation debt subject to the limitation may be offset by amounts set aside for repaying
CITY OF CARLSBAD BUDGET HIGHLIGHTS
A-23
general obligation bonds. For the last 10 years, the city’s general obligation debt has been
under 5 percent of the total calculated debt limit.
Since Fiscal Year 2008-09, no debt service payments have been required of the General Fund,
and no new debt is anticipated for the General Fund in the coming year. Of the approximately
$100 million of debt currently outstanding, none will be paid back using General Fund monies.
Rather, the debts will be repaid from sewer revenues, golf course revenues and from property
owners benefiting from the improvements built with bond proceeds. The city has no obligation
to advance funds to the assessment districts if the property owners do not pay.
The table below provides additional information on debt issued by the City of Carlsbad.
The following table identifies the debt the city has issued, the outstanding principal balance, the
2013-14 scheduled principal and interest payments, and the scheduled year of payoff.
Bond Name Repayment Source
Original Bond
Issue
Outstanding
Principal At
6/30/13
2013-14
Payment P&I
Final
Payment
FY
Carlsbad Public Financing Authority Bonds
Revenue Bonds Golf Course 18,540,000$17,005,000$1,115,850$2037
Enterprise Revenue
1996 Refunding Encina JPA
Tax Allocation Sewer Enterprise 11,080,000$1,765,000$928,419$2015
Bonds Revenue
1993 Redevelopment
Tax Allocation Redevelopment 15,495,000$8,625,000$1,038,915$2024
Bonds
CFD #3 2006 -Improvement Area 1
Special Tax Special District 11,490,000$10,325,000$758,654$2037
Bonds
CFD #3 2008-Improvement Area 2
Special Tax Special District 18,175,000$13,660,000$1,055,069$2039
Bonds
Subtotals 74,780,000$51,380,000$4,896,907$
2005 Poinsettia Lane East (AD 2002-1)
Limited Obligation Assessment 33,085,000$-$-$2036
Improvement Bonds District
2003 College Boulevard-Cannon Road (AD 2003-1)
Limited Obligation Assessment 11,760,000$-$-$2035
Improvement Bonds District
1997 Carlsbad Ranch (AD 95-1)
Limited Obligation Assessment 10,175,438$4,735,000$617,372$2023
Improvement Bonds District
1998 Rancho Carrillo (AD 96-1)
Limited Obligation Assessment 19,600,000$12,325,000$1,198,250$2029
Improvement Bonds District
2013 Reassessment District (AD 2012-1)
Limited Obligation Assessment 31,300,000$31,300,000$1,276,567$2036
Improvement Bonds District
Subtotals 105,920,438$48,360,000$3,092,189$
Totals 180,700,438$99,740,000$7,989,096$
City of Carlsbad
Debt Outstanding
CITY OF CARLSBAD BUDGET HIGHLIGHTS
A-23
general obligation bonds. For the last 10 years, the city’s general obligation debt has been
under 5 percent of the total calculated debt limit.
Since Fiscal Year 2008-09, no debt service payments have been required of the General Fund,
and no new debt is anticipated for the General Fund in the coming year. Of the approximately
$100 million of debt currently outstanding, none will be paid back using General Fund monies.
Rather, the debts will be repaid from sewer revenues, golf course revenues and from property
owners benefiting from the improvements built with bond proceeds. The city has no obligation
to advance funds to the assessment districts if the property owners do not pay.
The table below provides additional information on debt issued by the City of Carlsbad.
The following table identifies the debt the city has issued, the outstanding principal balance, the
2013-14 scheduled principal and interest payments, and the scheduled year of payoff.
Bond Name Repayment Source
Original Bond
Issue
Outstanding
Principal At
6/30/13
2013-14
Payment P&I
Final
Payment
FY
Carlsbad Public Financing Authority Bonds
Revenue Bonds Golf Course 18,540,000$17,005,000$1,115,850$2037
Enterprise Revenue
1996 Refunding Encina JPA
Tax Allocation Sewer Enterprise 11,080,000$1,765,000$928,419$2015
Bonds Revenue
1993 Redevelopment
Tax Allocation Redevelopment 15,495,000$8,625,000$1,038,915$2024
Bonds
CFD #3 2006 -Improvement Area 1
Special Tax Special District 11,490,000$10,325,000$758,654$2037
Bonds
CFD #3 2008-Improvement Area 2
Special Tax Special District 18,175,000$13,660,000$1,055,069$2039
Bonds
Subtotals 74,780,000$51,380,000$4,896,907$
2005 Poinsettia Lane East (AD 2002-1)
Limited Obligation Assessment 33,085,000$-$-$2036
Improvement Bonds District
2003 College Boulevard-Cannon Road (AD 2003-1)
Limited Obligation Assessment 11,760,000$-$-$2035
Improvement Bonds District
1997 Carlsbad Ranch (AD 95-1)
Limited Obligation Assessment 10,175,438$4,735,000$617,372$2023
Improvement Bonds District
1998 Rancho Carrillo (AD 96-1)
Limited Obligation Assessment 19,600,000$12,325,000$1,198,250$2029
Improvement Bonds District
2013 Reassessment District (AD 2012-1)
Limited Obligation Assessment 31,300,000$31,300,000$1,276,567$2036
Improvement Bonds District
Subtotals 105,920,438$48,360,000$3,092,189$
Totals 180,700,438$99,740,000$7,989,096$
City of Carlsbad
Debt Outstanding
A-24
BUDGET SUMMARY
FISCAL YEAR 2013-14
PROJECTED PROJECTED
BALANCE ESTIMATED ADOPTED FUND TRANSFERS BALANCE
PROGRAM AREA July 1, 2013 REVENUES BUDGET & CHANGES June 30, 2014
OPERATING BUDGET
Policy / Leadership Group 4,395,097$
Internal Services 19,879,831
Community Development 15,757,369
Community Services 31,963,716
Public Safety 46,900,673
Public Works 79,106,243
Non Departmental & Contingencies 16,734,349
SUBTOTAL OPERATING 134,973,934$ 220,590,249$ 214,737,278$-$ 140,826,905$
CAPITAL IMPROVEMENT PROGRAM
Fiscal Year 2013-14 466,193,848$ 43,525,592$ 44,739,035$ 464,980,405$
2012-13 Continuing Appropriations (170,147,445)
Projected CIP Fund Balance at June 30, 2014 294,832,960
TOTAL OPERATING AND CAPITAL 601,167,782$ 264,115,841$ 259,476,313$-$ 605,807,310$
FISCAL YEAR 2012-13
PROJECTED PROJECTED
BALANCE PROJECTED ESTIMATED FUND TRANSFERS BALANCE
PROGRAM AREA JULY 1, 2012 REVENUES EXPENDITURES & CHANGES JUNE 30, 2013
OPERATING BUDGET
Policy / Leadership Group 4,436,210$
Internal Services 21,550,130
Community Development 22,522,724
Community Services 31,869,090
Public Safety 46,002,230
Public Works 77,179,857
Non Departmental & Contingencies 13,572,596
Changes in Reservations and Designations (118,565)
SUBTOTAL OPERATING 135,817,885$ 216,407,451$ 217,132,837$ (118,565)$ 134,973,934$
CAPITAL IMPROVEMENT PROGRAM
Fiscal Year 2012-13 447,842,311$ 50,707,448$ 48,838,963$ 16,483,052$ 466,193,848$
TOTAL OPERATING AND CAPITAL 583,660,196$ 267,114,899$ 265,971,800$ 16,364,487$ 601,167,782$
A-24
BUDGET SUMMARY
FISCAL YEAR 2013-14
PROJECTED PROJECTED
BALANCE ESTIMATED ADOPTED FUND TRANSFERS BALANCE
PROGRAM AREA July 1, 2013 REVENUES BUDGET & CHANGES June 30, 2014
OPERATING BUDGET
Policy / Leadership Group 4,395,097$
Internal Services 19,879,831
Community Development 15,757,369
Community Services 31,963,716
Public Safety 46,900,673
Public Works 79,106,243
Non Departmental & Contingencies 16,734,349
SUBTOTAL OPERATING 134,973,934$ 220,590,249$ 214,737,278$-$ 140,826,905$
CAPITAL IMPROVEMENT PROGRAM
Fiscal Year 2013-14 466,193,848$ 43,525,592$ 44,739,035$ 464,980,405$
2012-13 Continuing Appropriations (170,147,445)
Projected CIP Fund Balance at June 30, 2014 294,832,960
TOTAL OPERATING AND CAPITAL 601,167,782$ 264,115,841$ 259,476,313$-$ 605,807,310$
FISCAL YEAR 2012-13
PROJECTED PROJECTED
BALANCE PROJECTED ESTIMATED FUND TRANSFERS BALANCE
PROGRAM AREA JULY 1, 2012 REVENUES EXPENDITURES & CHANGES JUNE 30, 2013
OPERATING BUDGET
Policy / Leadership Group 4,436,210$
Internal Services 21,550,130
Community Development 22,522,724
Community Services 31,869,090
Public Safety 46,002,230
Public Works 77,179,857
Non Departmental & Contingencies 13,572,596
Changes in Reservations and Designations (118,565)
SUBTOTAL OPERATING 135,817,885$ 216,407,451$ 217,132,837$(118,565)$ 134,973,934$
CAPITAL IMPROVEMENT PROGRAM
Fiscal Year 2012-13 447,842,311$ 50,707,448$ 48,838,963$ 16,483,052$ 466,193,848$
TOTAL OPERATING AND CAPITAL 583,660,196$ 267,114,899$ 265,971,800$ 16,364,487$ 601,167,782$
2013-2014 Operating Budget &
Capital Improvement ProgramCALIFORNIA Operating Budget
Operating Budget
Operating Budget
2013-14 OPERATING BUDGET OVERVIEW
B-15
x The Human Resources Department supports the city with staffing and recruitment,
employee development, performance management, and compensation and labor
relations services. An increase in contractual services related to investigations and fact-
finding account for the increase of $100,000, as compared to the FY 2012-13 budget.
x The Library and Cultural Arts Department provides
staffing and a wide variety of programming for two library
branches, a library learning center, and a cultural arts office.
The department’s budget is projected to increase by
$100,000, or 1 percent, from FY 2012-13 to FY 2013-14.
x The Parks and Recreation Department plans, staffs and
maintains the city’s parks and recreational facilities, provides
an assortment of recreational programs for all ages,
maintains landscaping at facilities throughout the city, and
manages the city’s open space areas. Overall, the
department’s budget is increasing by $500,000, or 3.8
percent, from the prior year, largely due to the net change
from the elimination of 3 full-time positions, and the increase
of 2 full-time positions and 17 hourly positions to operate
Alga Norte Park, expected to open to the public during FY
2013-14.
x The Carlsbad Police Department provides high quality public safety services to the
community by enforcing laws and ordinances, preserving the peace, and providing for
the protection of life and property. Overall, the department’s costs are increasing by
$800,000, or 2.9 percent, for FY 2013-14 as compared to FY 2012-13. Approximately
$230,000 of the increase is due to internal service charges. Also, in FY 2013-14, a
$120,000 increase is for computer maintenance, and $50,000 is for miscellaneous
services, primarily for the animal control contract. Approximately $400,000 of the
increase is in overall personnel costs, with the remaining increases in supplies, training,
and general operations costs.
x The Property and Environmental Management
Department manages all city-owned property, including real
estate, buildings and vehicles. The department also
manages the city’s environmental programs, which include
storm water, habitat and other environmental maintenance
and monitoring programs. The approximately $400,000, or
8.4 percent, increase from the prior year’s budget is
primarily due to adding $200,000 for facility maintenance
costs associated with the opening of Alga Norte Park,
including the addition of a 0.50 hourly full-time equivalent
position, and $150,000 for the Safety Training Center, a new
facility which opened in FY 2012-13. The remaining
increase is primarily in items not included in the block
budget, such as miscellaneous facility projects.
x The Records Management budget of $800,000 for FY
2013-14 reflects no significant changes from FY 2012-13.
g
2013-14 OPERATING BUDGET OVERVIEW
B-15
x The Human Resources Department supports the city with staffing and recruitment,
employee development, performance management, and compensation and labor
relations services. An increase in contractual services related to investigations and fact-
finding account for the increase of $100,000, as compared to the FY 2012-13 budget.
x The Library and Cultural Arts Department provides
staffing and a wide variety of programming for two library
branches, a library learning center, and a cultural arts office.
The department’s budget is projected to increase by
$100,000, or 1 percent, from FY 2012-13 to FY 2013-14.
x The Parks and Recreation Department plans, staffs and
maintains the city’s parks and recreational facilities, provides
an assortment of recreational programs for all ages,
maintains landscaping at facilities throughout the city, and
manages the city’s open space areas. Overall, the
department’s budget is increasing by $500,000, or 3.8
percent, from the prior year, largely due to the net change
from the elimination of 3 full-time positions, and the increase
of 2 full-time positions and 17 hourly positions to operate
Alga Norte Park, expected to open to the public during FY
2013-14.
x The Carlsbad Police Department provides high quality public safety services to the
community by enforcing laws and ordinances, preserving the peace, and providing for
the protection of life and property. Overall, the department’s costs are increasing by
$800,000, or 2.9 percent, for FY 2013-14 as compared to FY 2012-13. Approximately
$230,000 of the increase is due to internal service charges. Also, in FY 2013-14, a
$120,000 increase is for computer maintenance, and $50,000 is for miscellaneous
services, primarily for the animal control contract. Approximately $400,000 of the
increase is in overall personnel costs, with the remaining increases in supplies, training,
and general operations costs.
x The Property and Environmental Management
Department manages all city-owned property, including real
estate, buildings and vehicles. The department also
manages the city’s environmental programs, which include
storm water, habitat and other environmental maintenance
and monitoring programs. The approximately $400,000, or
8.4 percent, increase from the prior year’s budget is
primarily due to adding $200,000 for facility maintenance
costs associated with the opening of Alga Norte Park,
including the addition of a 0.50 hourly full-time equivalent
position, and $150,000 for the Safety Training Center, a new
facility which opened in FY 2012-13. The remaining
increase is primarily in items not included in the block
budget, such as miscellaneous facility projects.
x The Records Management budget of $800,000 for FY
2013-14 reflects no significant changes from FY 2012-13.
g
2013-14 OPERATING BUDGET OVERVIEW
B-16
x The Storm Drain Engineering division of the Utilities Department is budgeted in the
General Fund. No significant change is expected for FY 2013-14 as compared to the FY
2012-13 budget appropriation.
x The Transportation Department manages
all streets, traffic and other city-wide
transportation services, including city traffic
engineering, traffic signal monitoring and
maintenance, and maintenance of all city
streets and roadways. The department
budget is expected to decrease $100,000,
or 1.6 percent from FY 2012-13 to FY 2013-
14.
x Non-departmental expenses include the
transfers previously discussed, the Council
Contingency account, and administrative
and other expenses not associated with any one department. The non-departmental
budget is $2.8 million, or 20 percent greater than the FY 2012-13 adopted budget. This
increase is primarily due to a transfer to the General Capital Construction fund of $1.4
million for Village and Barrio revitalization projects, and a $750,000 transfer to the
General Liability fund for increases in settlements and estimated claims payable.
x The Council Contingency is a budgeted amount that is available to the City Council to
address unanticipated emergencies or unforeseen program needs during the fiscal year.
Prior to the economic recession, the Council Contingency budget provided between 2
and 2.5 percent of the General Fund Operating Budget for these unforeseen costs. The
Council Contingency was reduced significantly during the last three years to ensure a
balanced budget during the economic recession. For FY 2013-14, the Contingency is
budgeted $1.5 million, with no change when compared to the prior year.
102
104
106
108
110
112
114
116
118
120
122
FY 2007-08
$116.5m
FY 2008-09r
$112.7m
FY 2009-10
$109.1m
FY 2010-11
$109.4m
FY 2011-12
$111.8m
FY 2012-13
$115.2m
FY 2013-14
$119.7m
+9.5%
(3.3%)
(3.2%) +.03%
+2.2%
+3.0%
+3.9%
History of General Fund Expenditures
2013-14 OPERATING BUDGET OVERVIEW
B-16
x The Storm Drain Engineering division of the Utilities Department is budgeted in the
General Fund. No significant change is expected for FY 2013-14 as compared to the FY
2012-13 budget appropriation.
x The Transportation Department manages
all streets, traffic and other city-wide
transportation services, including city traffic
engineering, traffic signal monitoring and
maintenance, and maintenance of all city
streets and roadways. The department
budget is expected to decrease $100,000,
or 1.6 percent from FY 2012-13 to FY 2013-
14.
x Non-departmental expenses include the
transfers previously discussed, the Council
Contingency account, and administrative
and other expenses not associated with any one department. The non-departmental
budget is $2.8 million, or 20 percent greater than the FY 2012-13 adopted budget. This
increase is primarily due to a transfer to the General Capital Construction fund of $1.4
million for Village and Barrio revitalization projects, and a $750,000 transfer to the
General Liability fund for increases in settlements and estimated claims payable.
x The Council Contingency is a budgeted amount that is available to the City Council to
address unanticipated emergencies or unforeseen program needs during the fiscal year.
Prior to the economic recession, the Council Contingency budget provided between 2
and 2.5 percent of the General Fund Operating Budget for these unforeseen costs. The
Council Contingency was reduced significantly during the last three years to ensure a
balanced budget during the economic recession. For FY 2013-14, the Contingency is
budgeted $1.5 million, with no change when compared to the prior year.
102
104
106
108
110
112
114
116
118
120
122
FY 2007-08
$116.5m
FY 2008-09r
$112.7m
FY 2009-10
$109.1m
FY 2010-11
$109.4m
FY 2011-12
$111.8m
FY 2012-13
$115.2m
FY 2013-14
$119.7m
+9.5%
(3.3%)
(3.2%) +.03%
+2.2%
+3.0%
+3.9%
History of General Fund Expenditures
2013-14 OPERATING BUDGET OVERVIEW
B-17
As reflected in the chart above, the city’s expenditures were reduced significantly with the City
Council’s revised budget in FY 2008-09, reflecting a 3.3 percent decrease from the FY 2007-08
Adopted Budget. A further 3.2 percent reduction was made in FY 2009-10 in order to reduce
expenditures in line with continued General Fund revenue declines. Expenditure projections for
FY 2010-11 remained relatively flat, with growth of less than one percent, in anticipation of a flat
economy. For FY 2011-12 General Fund expenditures showed a slight increase of 2.2 percent,
supported by projected revenue increases. For FY 2012-13 General Fund expenditures were
expected to increase by $3.3 million, or 3 percent. In FY 2013-14 expenditures are budgeted to
increase $4.5 million, or 3.9 percent.
Changes in Other Funds
Special Revenue funds, at $10.6 million, are down $200,000, or 2.0 percent, from the prior
year. While there are several Special Revenue funds with fluctuations from year to year, the
most significant decrease is in funding for rental assistance.
Enterprise funds total $65.9 million, which is an increase of $1.2 million, or 1.9 percent, over
the FY 2012-13 Adopted Budget. The most significant change in Water Operations is due to the
estimated increase in the cost of water purchased from the San Diego County Water Authority
with an estimated 4 percent increase in commodity purchases and a 5.5 percent increase in
fixed costs, effective January 1, 2014. Carlsbad customers decreased water consumption for
several years; however, in FY 2012-13 the quantities purchased began to increase. The
quantities purchased are expected to follow the same trajectory in FY 2013-14 as in FY 2012-
13. The Operating Budget also includes funding for infrastructure replacement transfers related
to growth and aging of the water system.
Wastewater operations are projected to decrease 1.3 percent, or $200,000, over the Adopted
Budget for FY 2012-13. This decrease in the operating budget is primarily due to a reduction in
personnel related costs and Encina services costs.
Golf Course operations are expected to remain relatively flat for FY 2013-14. The Golf Course
budget was previously done on a calendar year basis; beginning July 1, 2013 the budget and
financial reporting will occur on a fiscal year basis.
The Internal Service funds total $17.2 million, a decrease of $900,000, or 5 percent, from the
prior year. The Internal Service funds are self-supporting through user charges. Changes
occurred in a number of these funds, including the following:
x The Worker’s Compensation budget shows an increase of approximately $100,000, or
7.2 percent, based on settlements and estimated claims payable, as compared to the
prior fiscal year.
x The Self Insured Benefits budget shows a decrease of $2.7 million due to budgeted
transfers in FY 2012-13 for anticipated future pension rate increases.
x The Vehicle Maintenance and Replacement budget remains relatively flat when
compared to FY 2012-13. A list of the requested replacement vehicles can be found at
the end of this document.
x The Information Technology budget shows an increase in the department’s budget of
approximately $1.5 million, or 24 percent, from the prior fiscal year. About $1.1 million of
this increase is due to replacement of equipment, and the remaining $400,000 is for
planned increases in maintenance and support of new software and hardware.
2013-14 OPERATING BUDGET OVERVIEW
B-17
As reflected in the chart above, the city’s expenditures were reduced significantly with the City
Council’s revised budget in FY 2008-09, reflecting a 3.3 percent decrease from the FY 2007-08
Adopted Budget. A further 3.2 percent reduction was made in FY 2009-10 in order to reduce
expenditures in line with continued General Fund revenue declines. Expenditure projections for
FY 2010-11 remained relatively flat, with growth of less than one percent, in anticipation of a flat
economy. For FY 2011-12 General Fund expenditures showed a slight increase of 2.2 percent,
supported by projected revenue increases. For FY 2012-13 General Fund expenditures were
expected to increase by $3.3 million, or 3 percent. In FY 2013-14 expenditures are budgeted to
increase $4.5 million, or 3.9 percent.
Changes in Other Funds
Special Revenue funds, at $10.6 million, are down $200,000, or 2.0 percent, from the prior
year. While there are several Special Revenue funds with fluctuations from year to year, the
most significant decrease is in funding for rental assistance.
Enterprise funds total $65.9 million, which is an increase of $1.2 million, or 1.9 percent, over
the FY 2012-13 Adopted Budget. The most significant change in Water Operations is due to the
estimated increase in the cost of water purchased from the San Diego County Water Authority
with an estimated 4 percent increase in commodity purchases and a 5.5 percent increase in
fixed costs, effective January 1, 2014. Carlsbad customers decreased water consumption for
several years; however, in FY 2012-13 the quantities purchased began to increase. The
quantities purchased are expected to follow the same trajectory in FY 2013-14 as in FY 2012-
13. The Operating Budget also includes funding for infrastructure replacement transfers related
to growth and aging of the water system.
Wastewater operations are projected to decrease 1.3 percent, or $200,000, over the Adopted
Budget for FY 2012-13. This decrease in the operating budget is primarily due to a reduction in
personnel related costs and Encina services costs.
Golf Course operations are expected to remain relatively flat for FY 2013-14. The Golf Course
budget was previously done on a calendar year basis; beginning July 1, 2013 the budget and
financial reporting will occur on a fiscal year basis.
The Internal Service funds total $17.2 million, a decrease of $900,000, or 5 percent, from the
prior year. The Internal Service funds are self-supporting through user charges. Changes
occurred in a number of these funds, including the following:
x The Worker’s Compensation budget shows an increase of approximately $100,000, or
7.2 percent, based on settlements and estimated claims payable, as compared to the
prior fiscal year.
x The Self Insured Benefits budget shows a decrease of $2.7 million due to budgeted
transfers in FY 2012-13 for anticipated future pension rate increases.
x The Vehicle Maintenance and Replacement budget remains relatively flat when
compared to FY 2012-13. A list of the requested replacement vehicles can be found at
the end of this document.
x The Information Technology budget shows an increase in the department’s budget of
approximately $1.5 million, or 24 percent, from the prior fiscal year. About $1.1 million of
this increase is due to replacement of equipment, and the remaining $400,000 is for
planned increases in maintenance and support of new software and hardware.
2013-14 OPERATING BUDGET OVERVIEW
B-18
The budgets for the Redevelopment Obligation Retirement Funds (RORF) budgets have
decreased by $100,000 or 7.5 percent, from the Redevelopment Agency Fund budgets shown
in the previous year. On June 29, 2011, California Governor Jerry Brown signed ABX1 26 to
dissolve all redevelopment agencies within the State of California. All agencies were
subsequently dissolved as of February 1, 2012, and a Successor Agency was designated to
complete the work of the Carlsbad Redevelopment Agency (RDA) and satisfy the financial
obligations. The FY 2013-14 Operating Budget reflects two Recognized Obligation Payment
Schedules (ROPS) that will be prepared by the Successor Agency (one has already been
submitted for approval and one will be completed during FY 2013-14), but which must ultimately
be approved by the Oversight Board, the County of San Diego and the State of California. The
ROPS identifies financial commitments of the former RDA, including $250,000 in administrative
costs, which will be paid from semi-annual tax increment revenue received by the Successor
Agency and annual debt service requirements. Every six months a new ROPS must be
prepared and approved by the Oversight Board, the County of San Diego and the State of
California in order to receive additional tax increment. During FY 2012-13, the city was notified
that several items were not approved in their ROPS (including parking lot leases in the
downtown area), creating a reduction in the FY 2013-14 expenditure budget.
SUMMARY
This Operating Budget for FY 2013-14 provides a balanced budget for the coming fiscal year
while continuing with a long-term plan to sustain a balanced budget in future years. Significant
ongoing operating expenses were identified and incorporated in FY 2013-14 to ensure the
budget reflects the ongoing financial obligations of the city. The Carlsbad economy is
continuing to improve, as a strong economic base is aided by the addition of hotel, retail and
commercial projects. Major revenue sources are improving in the city, with continued gains
seen in property tax, sales tax, and hotel tax revenues.
Carlsbad still faces economic challenges from a fluctuating economy, continued fixed costs
increases, and concerns over the impact that budget decisions at the state and federal levels
could have on the city’s financial situation. To meet these challenges, the city has initiated a
program to evaluate all city operations looking for opportunities to reduce costs through
efficiencies, shared services or contracting out services in some areas when that makes sense.
The city has already seen results from these efforts. As fixed costs like utilities, insurance, and
supplies have increased, departments have been able to reduce costs in other areas to
maintain a balanced budget without impacting services provided to the community.
The City of Carlsbad is entering the new fiscal year in a solid financial position and focused on
the future. Careful planning and responsible management have allowed the city to not only
maintain core services, but to also move ahead on community projects and other investments
that contribute to an excellent quality of life in our community. Promoting a strong local economy
and bringing more jobs to the city is a top priority. Due to continued fiscally conservative
practices, the city is in an excellent position to take advantage of new economic opportunities
that will allow our community to thrive now and for many years in the future.
2013-14 OPERATING BUDGET OVERVIEW
B-18
The budgets for the Redevelopment Obligation Retirement Funds (RORF) budgets have
decreased by $100,000 or 7.5 percent, from the Redevelopment Agency Fund budgets shown
in the previous year. On June 29, 2011, California Governor Jerry Brown signed ABX1 26 to
dissolve all redevelopment agencies within the State of California. All agencies were
subsequently dissolved as of February 1, 2012, and a Successor Agency was designated to
complete the work of the Carlsbad Redevelopment Agency (RDA) and satisfy the financial
obligations. The FY 2013-14 Operating Budget reflects two Recognized Obligation Payment
Schedules (ROPS) that will be prepared by the Successor Agency (one has already been
submitted for approval and one will be completed during FY 2013-14), but which must ultimately
be approved by the Oversight Board, the County of San Diego and the State of California. The
ROPS identifies financial commitments of the former RDA, including $250,000 in administrative
costs, which will be paid from semi-annual tax increment revenue received by the Successor
Agency and annual debt service requirements. Every six months a new ROPS must be
prepared and approved by the Oversight Board, the County of San Diego and the State of
California in order to receive additional tax increment. During FY 2012-13, the city was notified
that several items were not approved in their ROPS (including parking lot leases in the
downtown area), creating a reduction in the FY 2013-14 expenditure budget.
SUMMARY
This Operating Budget for FY 2013-14 provides a balanced budget for the coming fiscal year
while continuing with a long-term plan to sustain a balanced budget in future years. Significant
ongoing operating expenses were identified and incorporated in FY 2013-14 to ensure the
budget reflects the ongoing financial obligations of the city. The Carlsbad economy is
continuing to improve, as a strong economic base is aided by the addition of hotel, retail and
commercial projects. Major revenue sources are improving in the city, with continued gains
seen in property tax, sales tax, and hotel tax revenues.
Carlsbad still faces economic challenges from a fluctuating economy, continued fixed costs
increases, and concerns over the impact that budget decisions at the state and federal levels
could have on the city’s financial situation. To meet these challenges, the city has initiated a
program to evaluate all city operations looking for opportunities to reduce costs through
efficiencies, shared services or contracting out services in some areas when that makes sense.
The city has already seen results from these efforts. As fixed costs like utilities, insurance, and
supplies have increased, departments have been able to reduce costs in other areas to
maintain a balanced budget without impacting services provided to the community.
The City of Carlsbad is entering the new fiscal year in a solid financial position and focused on
the future. Careful planning and responsible management have allowed the city to not only
maintain core services, but to also move ahead on community projects and other investments
that contribute to an excellent quality of life in our community. Promoting a strong local economy
and bringing more jobs to the city is a top priority. Due to continued fiscally conservative
practices, the city is in an excellent position to take advantage of new economic opportunities
that will allow our community to thrive now and for many years in the future.
B-19
CITY OF CARLSBAD
OPERATING FUNDS
PROJECTED FUND BALANCES
UNRESERVED ADVANCES PROJECTED
BALANCE PROJECTED PROJECTED & FUND OTHER BALANCE
FUND JULY 1, 2012 REVENUES EXPENDITURES TRANSFERS CHANGES JUNE 30, 2013
GENERAL FUND $61,383,660 *$117,298,000 $115,521,155 $63,160,505 *
REPAYMENT FROM SOLID WASTE -
ADVANCE TO SCCRDA -
ADVANCE TO GOLF COURSE FUND -
ADVANCE TO HABITAT MITIGATION FEE FUND (118,565)(118,565)
CHANGE IN RESERVATIONS & DESIGNATIONS -
TOTAL GENERAL FUND 61,383,660 117,298,000 115,521,155 63,041,940
SPECIAL REVENUE
AFFORDABLE HOUSING 19,064,963 2,160,700 546,503 20,679,160
BUENA VISTA CHANNEL MAINTENANCE 1,366,597 122,000 260,000 1,228,597
CITIZEN'S OPTION FOR PUBLIC SAFETY 70,673 149,900 110,388 110,185
COMMUNITY ACTIVITY GRANTS 1,076,763 5,000 55,060 1,026,703
COMMUNITY DEVELOPMENT BLOCK GRANT 220,777 1,193,000 1,580,191 (166,414)
CULTURAL ARTS DONATIONS 156,243 37,900 66,820 127,323
LIBRARY AND ARTS ENDOWMENT FUND 259,357 1,000 6,014 254,343
LIBRARY GIFTS/BEQUESTS 140,451 127,000 116,000 151,451
LIGHTING AND LANDSCAPING DISTRICT NO. 2 1,446,402 523,400 240,000 1,729,802
LOCAL CABLE INFRASTRUCTURE FUND 668,716 371,000 219,512 820,204
MEDIAN MAINTENANCE 156,833 736,000 860,000 32,833
PARKING IN LIEU 400,179 - 44,000 356,179
POLICE ASSET FORFEITURE 614,376 96,000 207,678 502,698
POLICE GRANTS (171,343) 729,600 - 558,257
RECREATION DONATIONS 214,442 36,600 14,000 237,042
RENTAL ASSISTANCE - SECTION 8 597,835 5,885,300 6,365,483 117,652
SENIOR DONATIONS 203,057 133,900 25,000 311,957
STREET LIGHTING 635,068 1,471,300 993,320 1,113,048
STREET TREE MAINTENANCE 45,085 611,100 650,000 6,185
TOTAL SPECIAL REVENUE 27,166,474 14,390,700 12,359,969 29,197,205
ENTERPRISE
WATER OPERATIONS (7,763)36,258,500 34,552,154 1,698,583
RECYCLED WATER OPERATIONS 5,068,834 7,670,650 7,383,139 5,356,345
WASTEWATER OPERATIONS 146,937 11,895,257 10,772,025 1,270,169
SOLID WASTE MANAGEMENT 9,592,343 3,423,565 3,093,321 9,922,587
GOLF COURSE 493,577 7,500,000 7,491,575 502,002
TOTAL ENTERPRISE 15,293,928 66,747,972 63,292,214 18,749,686
INTERNAL SERVICE
WORKERS' COMPENSATION 1,487,800 2,053,783 3,500,000 41,583
RISK MANAGEMENT 294,870 1,876,654 1,837,240 334,284
SELF-INSURED BENEFITS 2,534,114 2,653,955 3,998,780 1,189,289
VEHICLE MAINTENANCE 321,891 2,739,346 2,233,779 827,458
VEHICLE REPLACEMENT 15,070,668 1,894,228 1,556,418 15,408,478
INFORMATION TECHNOLOGY 4,668,072 6,699,807 5,609,756 5,758,123
TOTAL INTERNAL SERVICE 24,377,415 17,917,773 18,735,973 23,559,215
REDEVELOPMENT OBLIGATION RETIREMENT FUNDS
VILLAGE RDA OBLIGATION RETIREMENT FUND 7,596,408 53,006 7,223,526 425,888
TOTAL REDEVELOPMENT OBLIGATION RETIREMENT FUNDS 7,596,408 53,006 7,223,526 425,888
TOTAL OPERATING FUNDS $135,817,885 $216,407,451 $217,132,837 ($118,565)$0 $134,973,934
* FOR THE GENERAL FUND ONLY THIS REPRESENTS UNASSIGNED FUND BALANCE.
B-20
CITY OF CARLSBAD
OPERATING FUNDS
PROJECTED FUND BALANCES
PROJECTED ADVANCES PROJECTED
BALANCE ESTIMATED ADOPTED & FUND OTHER BALANCE
FUND JULY 1, 2013 REVENUES BUDGET TRANSFERS CHANGES JUNE 30, 2014
GENERAL FUND $63,041,940 *$121,003,185 $119,665,690 $64,379,435 *
REPAYMENT FROM SOLID WASTE 0
ADVANCE TO SCCRDA 0
ADVANCE TO GOLF COURSE FUND 0
ADVANCE TO HABITAT MITIGATION FEE FUND 0
CHANGE IN RESERVATIONS & DESIGNATIONS 0
TOTAL GENERAL FUND 63,041,940 121,003,185 119,665,690 64,379,435
SPECIAL REVENUE
AFFORDABLE HOUSING 20,679,160 595,000 461,067 20,813,093
BUENA VISTA CHANNEL MAINTENANCE 1,228,597 121,000 105,925 1,243,672
CITIZEN'S OPTION FOR PUBLIC SAFETY 110,185 110,400 125,035 95,550
COMMUNITY ACTIVITY GRANTS 1,026,703 10,000 10,000 1,026,703
COMMUNITY DEVELOPMENT BLOCK GRANT (166,414)913,000 563,190 183,396
CULTURAL ARTS DONATIONS 127,323 40,500 68,400 99,423
LIBRARY AND ARTS ENDOWMENT FUND 254,343 2,000 4,000 252,343
LIBRARY GIFTS/BEQUESTS 151,451 120,000 63,367 208,084
LIGHTING AND LANDSCAPING DISTRICT NO. 2 1,729,802 542,153 246,439 2,025,516
LOCAL CABLE INFRASTRUCTURE FUND 820,204 371,000 356,738 834,466
MEDIAN MAINTENANCE 32,833 713,734 741,370 5,197
PARKING IN LIEU 356,179 0 42,000 314,179
POLICE ASSET FORFEITURE 502,698 54,500 251,761 305,437
POLICE GRANTS 558,257 8,100 0 566,357
RECREATION DONATIONS 237,042 23,700 51,969 208,773
RENTAL ASSISTANCE - SECTION 8 117,652 5,551,700 5,990,386 (321,034)
SENIOR DONATIONS 311,957 30,000 35,100 306,857
STREET LIGHTING 1,113,048 882,402 882,971 1,112,479
STREET TREE MAINTENANCE 6,185 652,283 649,668 8,800
TOTAL SPECIAL REVENUE 29,197,205 10,741,472 10,649,386 29,289,291
ENTERPRISE
WATER OPERATIONS 1,698,583 38,117,000 36,077,284 3,738,299
RECYCLED WATER OPERATIONS 5,356,345 7,945,650 7,523,438 5,778,557
WASTEWATER OPERATIONS 1,270,169 11,972,119 11,186,522 2,055,766
SOLID WASTE MANAGEMENT 9,922,587 3,485,145 3,595,771 9,811,961
GOLF COURSE 502,002 7,517,749 7,498,961 520,790
TOTAL ENTERPRISE 18,749,686 69,037,663 65,881,976 21,905,373
INTERNAL SERVICE
WORKERS' COMPENSATION 41,583 1,568,120 1,774,781 (165,078)
RISK MANAGEMENT 334,284 2,701,490 1,701,927 1,333,847
SELF-INSURED BENEFITS 1,189,289 2,897,019 1,521,397 2,564,911
VEHICLE MAINTENANCE 827,458 2,810,684 2,874,734 763,408
VEHICLE REPLACEMENT 15,408,478 1,505,824 1,287,565 15,626,737
INFORMATION TECHNOLOGY 5,758,123 7,033,392 8,088,407 4,703,108
TOTAL INTERNAL SERVICE 23,559,215 18,516,529 17,248,811 24,826,933
REDEVELOPMENT OBLIGATION RETIREMENT FUNDS
VILLAGE RDA OBLIGATION RETIREMENT FUND 425,888 1,291,400 1,291,415 425,873
TOTAL REDEVELOPMENT OBLIGATION RETIREMENT FUNDS 425,888 1,291,400 1,291,415 425,873
TOTAL OPERATING FUNDS $134,973,934 $220,590,249 $214,737,278 $0 $0 $140,826,905
* FOR THE GENERAL FUND ONLY THIS REPRESENTS UNDESIGNATED, UNRESERVED FUND BALANCE.
B-21
CITY OF CARLSBAD
OPERATING FUNDS
REVENUE ESTIMATES
ACTUAL PROJECTED ESTIMATED AS %DIFFERENCE
REVENUE REVENUE REVENUE OF FY 12-13 2012-13 TO
REVENUE SOURCE 2011-12 2012-13 2013-14 PROJECTED 2013-14
GENERAL FUND
TAXES
PROPERTY TAX $48,181,123 $47,703,000 $48,409,000 1.5%$706,000
SALES TAX 28,733,198 29,910,000 31,107,000 4.0%1,197,000
TRANSIENT TAX 12,872,425 13,857,000 14,710,000 6.2%853,000
FRANCHISE TAX 4,851,742 4,908,000 5,002,000 1.9%94,000
BUSINESS LICENSE TAX 3,668,441 3,536,000 3,677,000 4.0%141,000
TRANSFER TAX 924,807 1,086,000 1,097,000 1.0%11,000
TOTAL TAXES 99,231,736 101,000,000 104,002,000 3.0%3,002,000
INTERGOVERNMENTAL
VEHICLE LICENSE FEES 52,838 55,000 0 -100.0%(55,000)
HOMEOWNERS EXEMPTION 368,465 370,000 372,000 0.5%2,000
OTHER INTERGOVERNMENTAL 644,130 500,000 627,000 25.4%127,000
TOTAL INTERGOVERNMENTAL 1,065,433 925,000 999,000 8.0%74,000
LICENSES AND PERMITS
BUILDING PERMITS 878,316 577,000 751,000 30.2%174,000
OTHER LICENSES & PERMITS 973,545 640,000 833,000 30.2%193,000
TOTAL LICENSES & PERMITS 1,851,861 1,217,000 1,584,000 30.2%367,000
CHARGES FOR SERVICES
PLANNING FEES 324,097 213,000 277,000 30.1%64,000
BUILDING DEPT. FEES 695,988 457,000 595,000 30.2%138,000
ENGINEERING FEES 758,760 499,000 649,000 30.1%150,000
AMBULANCE FEES 2,689,979 2,763,000 2,500,000 -9.5%(263,000)
RECREATION FEES 1,534,000 1,582,000 2,114,378 33.7%532,378
OTHER CHARGES OR FEES 483,459 594,000 508,500 -14.4%(85,500)
TOTAL CHARGES FOR SERVICES 6,486,283 6,108,000 6,643,878 8.8%535,878
FINES AND FORFEITURES 731,732 858,000 813,500 -5.2%(44,500)
INCOME FROM INVESTMENTS
AND PROPERTY*2,053,365 2,608,000 2,158,824 -17.2%(449,176)
INTERDEPARTMENTAL CHARGES 3,751,784 3,727,000 3,946,983 5.9%219,983
OTHER REVENUE SOURCES 650,496 855,000 855,000 0.0%0
TOTAL GENERAL FUND $115,822,690 $117,298,000 $121,003,185 3.2%$3,705,185
* INTEREST IS CALCULATED ON AN AMORTIZED COST BASIS
B-22
CITY OF CARLSBAD
OPERATING FUNDS
REVENUE ESTIMATES
ACTUAL PROJECTED ESTIMATED AS %DIFFERENCE
REVENUE REVENUE REVENUE OF FY 12-13 2012-13 TO
REVENUE SOURCE 2011-12 2012-13 2013-14 PROJECTED 2013-14
SPECIAL REVENUE FUNDS
AFFORDABLE HOUSING
AFFORDABLE HOUSING FEES $1,727,445 $1,116,400 $163,000 -85.4%($953,400)
FEDERAL GRANT 42,341 809,300 100,000 -87.6%(709,300)
STATE GRANT 0 0 0 0.0%0
INTEREST 204,589 200,000 122,000 -39.0%(78,000)
OTHER 10,602,272 35,000 210,000 500.0%175,000
TOTAL AFFORDABLE HOUSING 12,576,647 2,160,700 595,000 -72.5%(1,565,700)
BUENA VISTA CHANNEL MAINTENANCE
BUENA VISTA FEES 157,331 100,000 100,000 0.0%0
INTEREST 16,324 22,000 21,000 -4.6%(1,000)
TOTAL BUENA VISTA CHANNEL MAINTENANCE 173,655 122,000 121,000 -0.8%(1,000)
CITIZEN'S OPTION FOR PUBLIC SAFETY
STATE FUNDING (AB3229)171,312 149,900 110,400 -26.4%(39,500)
INTEREST 695 0 0 0.0%0
TOTAL CITIZENS OPTION FOR PUBLIC SAFETY 172,007 149,900 110,400 -26.4%(39,500)
COMMUNITY ACTIVITY GRANTS
INTEREST 12,558 5,000 10,000 100.0%5,000
TOTAL COMMUNITY ACTIVITY GRANTS 12,558 5,000 10,000 100.0%5,000
COMMUNITY DEVELOPMENT BLOCK GRANT
FEDERAL GRANT 0 967,600 913,000 -5.6%(54,600)
INTEREST 22,480 400 0 -100.0%(400)
OTHER 3,852 225,000 0 -100.0%(225,000)
TOTAL COMMUNITY DEVELOPMENT BLOCK GRANT 26,332 1,193,000 913,000 -23.5%(280,000)
CULTURAL ARTS DONATIONS
DONATIONS 50,534 37,000 33,000 -10.8%(4,000)
INTEREST 1,671 300 0 -100.0%(300)
OTHER 8,516 600 7,500 1150.0%6,900
TOTAL CULTURAL ARTS DONATIONS 60,721 37,900 40,500 6.9%2,600
LIBRARY AND ARTS ENDOWMENT FUND
INTEREST 3,018 1,000 2,000 100.0%1,000
TOTAL LIBRARY AND ARTS ENDOWMENT FUND 3,018 1,000 2,000 100.0%1,000
LIBRARY GIFTS/BEQUESTS
GIFTS/BEQUESTS 128,682 126,000 120,000 -4.8%(6,000)
INTEREST 2,125 1,000 0 -100.0%(1,000)
OTHER 0 0 0 0.0%0
TOTAL LIBRARY GIFTS/BEQUESTS 130,807 127,000 120,000 -5.5%(7,000)
LIGHTING AND LANDSCAPING DISTRICT NO. #2
LLD #2 FEES 438,526 489,600 524,852 7.2%35,252
INTEREST 15,853 28,400 17,301 -39.1%(11,099)
OTHER 0 5,400 0 -100.0%(5,400)
TOTAL LIGHTING AND LANDSCAPING DIST. NO. #2 454,379 523,400 542,153 3.6%18,753
LOCAL CABLE INFRASTRUCTURE FUND
CABLE FEES 368,282 365,000 364,000 -0.3%(1,000)
INTEREST 6,899 6,000 7,000 16.7%1,000
TOTAL LOCAL CABLE INFRASTRUCTURE FUND 375,181 371,000 371,000 0.0%0
MEDIAN MAINTENANCE
MEDIAN MAINTENANCE FEES 355,974 358,000 358,734 0.2%734
INTEREST 89 0 0 0.0%0
OTHER 359,500 378,000 355,000 -6.1%(23,000)
TOTAL MEDIAN MAINTENANCE 715,563 736,000 713,734 -3.0%(22,266)
PARKING IN LIEU
IN LIEU FEES 0 0 0 0.0%0
INTEREST 0 0 0 0.0%0
TOTAL PARKING IN LIEU 0 0 0 0.0%0
POLICE ASSET FORFEITURE
ASSET FORFEITURES 49,734 94,500 50,000 -47.1%(44,500)
INTEREST 7,520 1,500 4,500 200.0%3,000
OTHER (74)0 0 0.0%0
TOTAL POLICE ASSET FORFEITURE 57,180 96,000 54,500 -43.2%(41,500)
POLICE GRANTS
FEDERAL GRANT 532,380 729,600 8,100 -98.9%(721,500)
INTEREST 45 0 0 0.0%0
TOTAL POLICE GRANTS 532,425 729,600 8,100 -98.9%(721,500)
B-23
CITY OF CARLSBAD
OPERATING FUNDS
REVENUE ESTIMATES
ACTUAL PROJECTED ESTIMATED AS %DIFFERENCE
REVENUE REVENUE REVENUE OF FY 12-13 2012-13 TO
REVENUE SOURCE 2011-12 2012-13 2013-14 PROJECTED 2013-14
SPECIAL REVENUE FUNDS - CONTINUED
RECREATION DONATIONS
DONATIONS & GRANTS 25,722 35,600 23,700 -33.4%(11,900)
INTEREST 2,359 1,000 0 -100.0%(1,000)
TOTAL RECREATION DONATIONS 28,081 36,600 23,700 -35.3%(12,900)
RENTAL ASSISTANCE
FEDERAL GRANT 6,028,802 5,855,900 5,545,000 -5.3%(310,900)
INTEREST 6,856 5,100 6,700 31.4%1,600
OTHER 20,215 24,300 0 -100.0%(24,300)
TOTAL RENTAL ASSISTANCE 6,055,873 5,885,300 5,551,700 -5.7%(333,600)
SENIOR DONATIONS
DONATIONS 8,302 120,000 8,000 -93.3%(112,000)
INTEREST 2,378 500 2,000 300.0%1,500
OTHER 14,533 13,400 20,000 49.3%6,600
TOTAL SENIOR DONATIONS 25,213 133,900 30,000 -77.6%(103,900)
STREET LIGHTING
GOVERNMENT GRANTS AND LOANS 204,563 587,100 0 -100.0%(587,100)
STREET LIGHTING FEES 728,559 730,600 728,772 -0.3%(1,828)
INTERDEPARTMENTAL 0 0 0 0.0%0
OTHER 177,378 141,400 141,400 0.0%0
INTEREST 9,969 12,200 12,230 0.3%30
TOTAL STREET LIGHTING 1,120,469 1,471,300 882,402 -40.0%(588,898)
STREET TREE MAINTENANCE
TREE MAINTENANCE FEES 463,855 461,500 462,283 0.2%783
INTEREST 278 0 0 0.0%0
OTHER 113,500 149,600 190,000 27.0%40,400
TOTAL STREET TREE MAINTENANCE 577,633 611,100 652,283 6.7%41,183
TOTAL SPECIAL REVENUE FUNDS $23,097,742 $14,390,700 $10,741,472 -25.4%($3,649,228)
B-24
CITY OF CARLSBAD
OPERATING FUNDS
REVENUE ESTIMATES
ACTUAL PROJECTED ESTIMATED AS %DIFFERENCE
REVENUE REVENUE REVENUE OF FY 12-13 2012-13 TO
REVENUE SOURCE 2011-12 2012-13 2013-14 PROJECTED 2013-14
ENTERPRISE FUNDS
WATER OPERATIONS
WATER SALES $21,442,931 $23,900,000 $25,200,000 5.4%$1,300,000
READY TO SERVE CHARGES 8,026,609 8,700,000 9,150,000 5.2%450,000
PROPERTY TAXES 2,722,560 2,665,000 2,855,000 7.1%190,000
NEW ACCOUNT CHARGES 129,695 135,000 120,000 -11.1%(15,000)
BACK-FLOW PROGRAM FEES 123,086 125,000 125,000 0.0%0
PENALTY FEES 301,394 316,500 280,000 -11.5%(36,500)
INTEREST 16,895 177,500 1,000 -99.4%(176,500)
ENGINEERING OVERHEAD 88,337 80,000 80,000 0.0%0
SERVICE CONNECTION FEES 122,242 100,000 100,000 0.0%0
AGRICULTURAL CREDITS 0 0 0 0.0%0
OTHER 248,537 59,500 206,000 246.2%146,500
TOTAL WATER OPERATIONS 33,222,286 36,258,500 38,117,000 5.1%1,858,500
RECYCLED WATER OPERATIONS
WATER SALES 5,094,428 5,760,000 6,000,000 4.2%240,000
READY-TO-SERVE CHARGE 580,879 625,000 650,000 4.0%25,000
RECYCLED WATER CREDITS 1,137,150 1,050,000 1,100,000 4.8%50,000
INTEREST 70,363 70,000 50,000 -28.6%(20,000)
OTHER 121,366 165,650 145,650 -12.1%(20,000)
TOTAL RECYCLED WATER OPERATIONS 7,004,186 7,670,650 7,945,650 3.6%275,000
WASTEWATER OPERATIONS
SERVICE CHARGES 10,905,656 11,500,000 11,530,000 0.3%30,000
MISC SEWER 31,339 32,000 23,000 -28.1%(9,000)
ENGINEERING OVERHEAD 173,091 175,000 180,000 2.9%5,000
PENALTY FEES 52,174 85,000 80,000 -5.9%(5,000)
INTEREST 78,345 72,119 89,119 23.6%17,000
OTHER 94,491 31,138 70,000 124.8%38,862
TOTAL WASTEWATER OPERATIONS 11,335,096 11,895,257 11,972,119 0.7%76,862
SOLID WASTE MANAGEMENT
INTEREST 119,781 125,000 113,145 -9.5%(11,855)
RECYCLING FEES (AB939)275,596 275,000 277,000 0.7%2,000
PENALTY FEES 53,739 57,000 57,000 0.0%0
TRASH SURCHARGE 2,631,421 2,700,000 2,700,000 0.0%0
OTHER 269,414 266,565 338,000 26.8%71,435
TOTAL SOLID WASTE MANAGEMENT 3,349,951 3,423,565 3,485,145 1.8%61,580
GOLF COURSE OPERATIONS
INTEREST 92,292 90,000 90,000 0.0%0
CHARGES FOR SERVICES 6,127,068 6,423,160 6,429,200 0.1%6,040
OTHER 1,644,592 986,840 998,549 1.2%11,709
TOTAL GOLF COURSE OPERATIONS 7,863,952 7,500,000 7,517,749 0.2%17,749
TOTAL ENTERPRISE FUNDS $62,775,471 $66,747,972 $69,037,663 3.4%$2,289,691
B-25
CITY OF CARLSBAD
OPERATING FUNDS
REVENUE ESTIMATES
ACTUAL PROJECTED ESTIMATED AS %DIFFERENCE
REVENUE REVENUE REVENUE OF FY 12-13 2012-13 TO
REVENUE SOURCE 2011-12 2012-13 2013-14 PROJECTED 2013-14
INTERNAL SERVICE FUNDS
WORKERS' COMPENSATION
INTERDEPARTMENTAL $1,457,230 $1,501,120 $1,501,120 0.0%$0
INTEREST 74,471 27,461 67,000 144.0%39,539
OTHER 286,347 525,202 0 -100.0%(525,202)
TOTAL WORKERS' COMPENSATION 1,818,048 2,053,783 1,568,120 -23.7%(485,663)
RISK MANAGEMENT
INTERDEPARTMENTAL 1,609,110 1,858,560 1,951,490 5.0%92,930
INTEREST 3,094 1,900 0 -100.0%(1,900)
OTHER 28,733 16,194 750,000 4531.3%733,806
TOTAL RISK MANAGEMENT 1,640,937 1,876,654 2,701,490 44.0%824,836
SELF-INSURED BENEFITS
INTERDEPARTMENTAL 813,828 771,303 817,089 5.9%45,786
INTEREST 0 0 0 0.0%0
OTHER 1,470,175 1,882,652 2,079,930 10.5%197,278
TOTAL SELF-INSURED BENEFITS 2,284,003 2,653,955 2,897,019 9.2%243,064
VEHICLE MAINTENANCE
INTERDEPARTMENTAL 2,515,825 2,720,170 2,794,684 2.7%74,514
INTEREST 2,422 0 0 0.0%0
OTHER 21,000 19,176 16,000 -16.6%(3,176)
TOTAL VEHICLE MAINTENANCE 2,539,247 2,739,346 2,810,684 2.6%71,338
VEHICLE REPLACEMENT
INTERDEPARTMENTAL 1,917,674 1,820,012 1,505,824 -17.3%(314,188)
INTEREST 175,551 74,216 0 -100.0%(74,216)
OTHER 3,387 0 0 0.0%0
TOTAL VEHICLE REPLACEMENT 2,096,612 1,894,228 1,505,824 -20.5%(388,404)
INFORMATION TECHNOLOGY
FEDERAL GRANT 0 0 0 0.0%0
INTERDEPARTMENTAL 6,682,808 6,656,904 6,983,592 4.9%326,688
INTEREST 54,783 24,063 49,800 107.0%25,737
OTHER 16,482 18,840 0 -100.0%(18,840)
TOTAL INFORMATION TECHNOLOGY 6,754,073 6,699,807 7,033,392 5.0%333,585
TOTAL INTERNAL SERVICE FUNDS $17,132,920 $17,917,773 $18,516,529 3.3%$598,756
REDEVELOPMENT OBLIGATION RETIREMENT FUNDS
VILLAGE RDA OBLIGATION RETIREMENT FUND
RENTAL INCOME $8,764 $0 $0 0.0%$0
TAX INCREMENT 2,607,668 0 1,291,400 0.0%1,291,400
INTEREST 45,041 53,006 0 -100.0%(53,006)
OTHER 2,822 0 0 0.0%0
TOTAL VILLAGE OPERATIONS / DEBT SERVICE 2,664,295 53,006 1,291,400 2336.3%1,238,394
TOTAL REDEVELOPMENT FUNDS $2,664,295 $53,006 $1,291,400 2336.3%$1,238,394
TOTAL OPERATING FUNDS $221,493,118 $216,407,451 $220,590,249 1.9%$4,182,798
B-26
%INCR (DEC)
2012-13 12-13 BUD
2010-11 2011-12 ESTIMATED 2012-13 2013-14 TO
DEPARTMENT ACTUAL*ACTUALS EXPENDITURES BUDGET BUDGET 13-14 BUD
GENERAL FUND
POLICY AND LEADERSHIP GROUP
CITY COUNCIL $352,145 $337,599 340,274 $352,729 $364,856 3.4%
CITY ATTORNEY 1,327,414 1,289,939 1,276,912 1,336,908 1,316,806 -1.5%
CITY CLERK 176,655 124,036 108,267 141,563 63,347 -55.3%
CITY MANAGER 1,348,850 1,442,294 1,635,927 1,504,476 1,388,651 -7.7%
CITY TREASURER 181,262 183,730 190,684 194,812 207,514 6.5%
COMMUNICATIONS 793,887 638,541 664,634 725,987 697,185 -4.0%
TOTAL POLICY AND LEADERSHIP GROUP 4,180,213 4,016,139 4,216,698 4,256,475 4,038,359 -5.1%
ADMINISTRATIVE SERVICES
FINANCE 3,472,814 3,395,659 3,778,015 3,511,305 3,591,465 2.3%
HUMAN RESOURCES 2,320,758 2,285,191 2,176,829 2,275,507 2,399,628 5.5%
RECORDS MANAGEMENT 775,002 687,969 649,510 792,303 802,226 1.3%
TOTAL ADMINISTRATIVE SERVICES 6,568,574 6,368,819 6,604,354 6,579,115 6,793,319 3.3%
COMMUNITY DEVELOPMENT
COMMUNITY AND ECONOMIC DEVELOPMENT 7,309,222 7,035,103 6,145,795 7,061,612 6,842,728 -3.1%
HOUSING AND NEIGHBORHOOD SERVICES 400,062 499,230 606,166 576,991 598,583 3.7%
TOTAL COMMUNITY DEVELOPMENT 7,709,284 7,534,333 6,751,961 7,638,603 7,441,311 -2.6%
COMMUNITY SERVICES
LIBRARY AND CULTURAL ARTS 10,528,095 10,418,253 10,413,256 10,308,502 10,394,004 0.8%
PARKS AND RECREATION 11,867,576 12,160,698 13,086,425 12,718,661 13,198,247 3.8%
TOTAL COMMUNITY SERVICES 22,395,671 22,578,951 23,499,681 23,027,163 23,592,251 2.5%
PUBLIC SAFETY
FIRE 16,121,182 17,034,490 18,048,059 17,540,315 17,777,047 1.3%
POLICE 27,670,820 27,506,352 27,636,105 27,937,848 28,746,830 2.9%
TOTAL PUBLIC SAFETY 43,792,002 44,540,842 45,684,164 45,478,163 46,523,877 2.3%
PUBLIC WORKS
PROPERTY AND ENVIROMENTAL MANAGEMENT 4,660,673 4,707,149 4,619,441 5,135,939 5,566,546 8.4%
TRANSPORTATION 8,312,277 8,327,015 10,268,151 8,840,761 8,696,580 -1.6%
STORM DRAIN ENGINEERING 260,580 237,203 304,109 281,483 279,098 -0.8%
TOTAL PUBLIC WORKS 13,233,530 13,271,367 15,191,701 14,258,183 14,542,224 2.0%
NOTE: ESTIMATED EXPENDITURES MAY EXCEED ADOPTED BUDGET SINCE THEY INCLUDE PRIOR YEAR BUDGET APPROPRIATIONS.
* ACTUALS, ESTIMATED EXPENDITURES AND BUDGET HAVE BEEN ADJUSTED TO REFLECT THE CITY'S REORGANIZATION IMPLEMENTATION.
CITY OF CARLSBAD
OPERATING FUNDS
BUDGET EXPENDITURE SCHEDULE
B-27
%INCR (DEC)
2012-13 12-13 BUD
2010-11 2011-12 ESTIMATED 2012-13 2013-14 TO
DEPARTMENT ACTUAL*ACTUALS EXPENDITURES BUDGET BUDGET 13-14 BUD
CITY OF CARLSBAD
OPERATING FUNDS
BUDGET EXPENDITURE SCHEDULE
GENERAL FUND - CONTINUED
MISCELLANEOUS NON-DEPARTMENTAL
EXPENDITURES
COMMUNITY CONTRIBUTIONS 51,612 187,316 133,517 0 0 -
DUES & SUBSCRIPTIONS 62,931 54,481 51,493 55,550 60,000 8.0%
LEGAL SERVICES 58,605 60,656 10,000 80,000 80,000 0.0%
PROFESSIONAL SERVICES 132,079 166,892 500,000 316,100 475,000 50.3%
OTHER MISCELLANEOUS EXPENDITURES 48,039 367,818 500,000 0 0 -
PERSONNEL RELATED 26,340 57,904 120,000 140,000 175,000 25.0%
PROPERTY TAX & OTHER ADMINISTRATION 724,334 735,656 650,000 800,000 650,000 -18.8%
TOTAL EXPENDITURES 1,103,940 1,630,723 1,965,010 1,391,650 1,440,000 3.5%
TRANSFERS
INFRASTRUCTURE REPLACEMENT FUND 7,175,000 7,382,000 7,547,000 7,547,000 7,800,000 3.4%
TRANSFERS TO SELF INSURED BEN.-PERS SETASIDE 0 1,400,000 1,800,000 1,800,000 2,000,000 11.1%
TRANSFERS TO GOLF COURSE 0 1,644,592 986,840 945,000 998,549 5.7%
TRANSFER TO LLD#1 (MEDIANS & TREES)253,850 473,000 527,746 527,746 545,000 3.3%
TRANSFER TO STORM WATER PROGRAM 134,790 165,497 246,000 210,000 253,000 20.5%
OTHER MISCELLANEOUS TRANSFERS 1,350,000 1,629,806 500,000 0 2,197,800 -
TOTAL TRANSFERS 8,913,640 12,694,895 11,607,586 11,029,746 13,794,349 25.1%
TOTAL MISCELLANEOUS NON-DEPARTMENTAL 10,017,580 14,325,618 13,572,596 12,421,396 15,234,349 22.6%
SUBTOTAL GENERAL FUND 107,896,854 112,636,069 115,521,155 113,659,098 118,165,690 4.0%
CONTINGENCIES 0 0 0 1,500,000 1,500,000 0.0%
TOTAL GENERAL FUND $107,896,854 $112,636,069 $115,521,155 $115,159,098 $119,665,690 3.9%
B-28
%INCR (DEC)
2012-13 12-13 BUD
2010-11 2011-12 ESTIMATED 2012-13 2013-14 TO
DEPARTMENT ACTUAL*ACTUALS EXPENDITURES BUDGET BUDGET 13-14 BUD
CITY OF CARLSBAD
OPERATING FUNDS
BUDGET EXPENDITURE SCHEDULE
SPECIAL REVENUE FUNDS
AFFORDABLE HOUSING $422,790 $668,816 $546,503 $573,244 $461,067 -19.6%
BUENA VISTA CHANNEL MAINTENANCE 84,852 111,753 260,000 133,230 105,925 -20.5%
CITIZEN'S OPTION FOR PUBLIC SAFETY 90,447 99,569 110,388 110,388 125,035 13.3%
COMMUNITY ACTIVITY GRANTS 0 1,680 55,060 28,000 10,000 -64.3%
COMMUNITY DEVELOPMENT BLOCK GRANT 584,813 1,287,064 1,580,191 540,570 563,190 4.2%
CULTURAL ARTS DONATIONS 88,949 66,854 66,820 62,500 68,400 9.4%
LIBRARY AND ARTS ENDOWMENT FUND 6,605 4,195 6,014 4,000 4,000 0.0%
LIBRARY GIFTS/BEQUESTS 118,516 117,952 116,000 65,620 63,367 -3.4%
LIGHTING AND LANDSCAPING DISTRICT NO. 2 192,045 214,544 240,000 236,256 246,439 4.3%
LOCAL CABLE INFRASTRUCTURE FUND 271,414 209,422 219,512 362,535 356,738 -1.6%
MEDIAN MAINTENANCE 715,442 759,636 860,000 735,758 741,370 0.8%
PARKING IN LIEU 0 0 44,000 0 42,000 -
POLICE ASSET FORFEITURE 19,450 247,319 207,678 35,775 251,761 603.7%
POLICE GRANTS 341,661 748,169 0 0 0 -
PUBLIC ART 187,672 0 0 0 0 -
RECREATION DONATIONS 18,236 34,358 14,000 39,319 51,969 32.2%
RENTAL ASSISTANCE 6,356,973 6,620,112 6,365,483 6,219,914 5,990,386 -3.7%
SENIOR DONATIONS 30,973 16,924 25,000 37,990 35,100 -7.6%
STREET LIGHTING 2,268,015 1,180,248 993,320 1,025,421 882,971 -13.9%
STREET TREE MAINTENANCE 645,070 662,694 650,000 651,432 649,668 -0.3%
TOTAL SPECIAL REVENUE FUNDS $12,443,923 $13,051,309 $12,359,969 $10,861,952 $10,649,386 -2.0%
ENTERPRISE FUNDS
WATER OPERATIONS $29,568,137 $30,796,638 $34,552,154 $34,654,191 $36,077,284 4.1%
RECYCLED WATER OPERATIONS 6,721,454 7,332,485 7,383,139 7,682,227 7,523,438 -2.1%
WASTEWATER OPERATIONS 9,502,110 10,374,682 10,772,025 11,336,015 11,186,522 -1.3%
SOLID WASTE MANAGEMENT 2,544,050 2,941,131 3,093,321 3,503,924 3,595,771 2.6%
GOLF COURSE OPERATIONS 7,554,766 7,528,195 7,491,575 7,491,475 7,498,961 0.1%
TOTAL ENTERPRISE FUNDS $55,890,517 $58,973,131 $63,292,214 $64,667,832 $65,881,976 1.9%
INTERNAL SERVICE FUNDS
WORKERS' COMPENSATION $3,029,600 $2,236,534 $3,500,000 $1,655,668 $1,774,781 7.2%
RISK MANAGEMENT 2,275,616 1,355,752 1,837,240 1,673,429 1,701,927 1.7%
SELF-INSURED BENEFITS 983,628 892,560 3,998,780 4,188,113 1,521,397 -63.7%
VEHICLE MAINTENANCE 2,696,576 2,773,322 2,233,779 2,837,449 2,874,734 1.3%
VEHICLE REPLACEMENT 599,765 1,406,396 1,556,418 1,274,500 1,287,565 1.0%
INFORMATION TECHNOLOGY 6,458,357 6,298,298 5,609,756 6,519,859 8,088,407 24.1%
TOTAL INTERNAL SERVICE FUNDS $16,043,542 $14,962,862 $18,735,973 $18,149,018 $17,248,811 -5.0%
REDEVELOPMENT OBLIGATION RETIREMENT FUNDS
VILLAGE RDA OBLIGATION RETIREMENT FUND $2,130,553 $1,473,037 $7,223,526 $1,396,715 $1,291,415 -7.5%
SCC RDA OBLIGATION RETIREMENT FUND 210,908 146,863 0 0 0 -
TOTAL REDEVELOPMENT $2,341,461 $1,619,900 $7,223,526 $1,396,715 $1,291,415 -7.5%
TOTAL OPERATING FUNDS $194,616,297 $201,243,271 $217,132,837 $210,234,615 $214,737,278 2.1%
General Fund $119,665,690
Non GF 95,071,588
$214,737,278
NOTE: Estimated expenditures may exceed Adopted Budget since they include prior year budget appropriations.
Policy and Leadership Group Policy Ldrshp
Policy Ldrshp
Policy and Leadership Group
Policy & LeadershipypOrg Chart by FunctionCity CouncilCity ManagerCity AttorneyCity ClerkCity TreasurerCitiCommunications
C-1
PROGRAM: POLICY AND LEADERSHIP
FUND: VARIOUS
PROGRAM GROUP: VARIOUS SUMMARY
2010-11
ACTUAL
2011-12
ACTUAL
2012-13
BUDGET
2013-14
BUDGET
PERSONNEL $3,018,452 $3,078,069 $3,166,086 $3,031,127
MAINTENANCE & OPERATIONS 1,354,540 1,114,665 1,348,162 1,275,742
CAPITAL OUTLAY 78,635 32,827 104,762 88,228
GRAND TOTAL $4,451,627 $4,225,561 $4,619,010 $4,395,097
FULL TIME POSITIONS 19.50 18.50 18.50 18.50
HOURLY/FTE POSITIONS 0.00 0.00 0.00 0.50
CITY COUNCIL
8%CITY CLERK
1%
TREASURER
5%
CITY MANAGER
32%
COMMUNICATIONS
24%
CITY ATTORNEY
30%
Admin Services
Admin Services
Admin ServicesAdmin Services
Administrative ServicesAdministrativeOrg Chart by FunctionAdministrative Services DirectorHuman ResourcesFinanceInformation TechnologyWorker’s CompensationRisk ManagementCompensationSelf-InsuredManagementRdSelfInsured BenefitsRecords
D-1
PROGRAM: ADMINISTRATIVE SERVICES
FUND: VARIOUS
PROGRAM GROUP: VARIOUS SUMMARY
2010-11
ACTUAL
2011-12
ACTUAL
2012-13
BUDGET
2013-14
BUDGET
PERSONNEL $8,426,102 $8,078,043 $11,424,306 $8,884,384
MAINTENANCE & OPERATIONS 10,822,455 9,464,943 9,299,741 10,023,425
CAPITAL OUTLAY 776,230 401,283 741,081 1,856,542
GRAND TOTAL $20,024,787 $17,944,269 $21,465,128 $20,764,351
FULL TIME POSITIONS 70.00 68.25 68.00 68.00
HOURLY/FTE POSITIONS 3.50 4.00 3.25 3.75
FINANCE
30%
HUMAN
RESOURCES
27%
INFORMATION
TECHNOLOGY
39%
RECORDS
MANAGEMENT
4%
D-2
PROGRAM: FINANCE
FUND: VARIOUS
PROGRAM GROUP: FINANCE SUMMARY
2010-11
ACTUAL
2011-12
ACTUAL
2012-13
BUDGET
2013-14
BUDGET
PERSONNEL $3,123,498 $3,108,375 $3,295,080 $3,315,631
MAINTENANCE & OPERATIONS 3,332,213 2,424,618 2,738,598 2,862,281
CAPITAL OUTLAY 1,731 10,724 0 0
GRAND TOTAL $6,457,442 $5,543,717 $6,033,678 $6,177,912
FULL TIME POSITIONS 30.50 30.50 30.50 31.50
HOURLY/FTE POSITIONS 1.00 1.00 1.00 1.00
FINANCE
72%
RISK MANAGEMENT
28%
D-7
PROGRAM: RECORDS MANAGEMENT
FUND: GENERAL
PROGRAM GROUP: RECORDS MANAGEMENT ACCT NO. 0011610
2010-11
ACTUAL
2011-12
ACTUAL
2012-13
BUDGET
2013-14
BUDGET
PERSONNEL $655,008 $560,019 $522,144 $472,601
MAINTENANCE & OPERATIONS 119,994 127,950 270,159 329,625
CAPITAL OUTLAY 0 0 0 0
GRAND TOTAL $775,002 $687,969 $792,303 $802,226
FULL TIME POSITIONS 8.00 6.25 6.00 5.00
HOURLY/FTE POSITIONS 0.00 0.50 0.50 1.00
PROGRAM DESCRIPTION:
The Records Management Department is responsible for developing and implementing citywide records
management and document management programs, and is tasked with maintaining city records in an identifiable and
accessible manner to fulfill public, legal, and historical requirements for preservation and storage of information. The
Records Management Department also provides staff support for the City Clerk.
PROGRAM ACTIVITIES:
Records Management
• Manage the citywide Records Management Program and Document Management System (DMS).
• Maintain city records in an identifiable and accessible manner in fulfillment of public, legal, and historical
requirements for preserving and storing information.
Administrative Support Activities
• Provide staff support for City Clerk functions such as elections, the Public Records Act, noticing, processing
documents for recordation, and updating the Municipal Code.
• Assist the public and city staff by providing information such as minutes, agendas, ordinances, resolutions,
deeds, and other critical documents.
KEY ACHIEVEMENTS FOR 2012-13:
• Continued implementation of the DMS Master Plan roles and responsibilities.
• Continued to revise the Records Retention Schedule to align with the changes in the city organization.
• Digitized archival paper legislative records for placement in the DMS.
• Initiated migration of the Document Management System.
• Revised the Records Management Program audit process to ensure Program compliance.
KEY GOALS FOR 2013-14:
Top Quality Services
• Continue to educate key personnel on the use of the Records Management Program, DMS, Electronic Records,
Public Records Act, and Subpoena processing.
• Continue to provide resource information to the organization via the Intranet and to the public via the Internet.
• Continue to prepare Records Emergency Action Plan for responding to disasters.
• Conduct records audits throughout the organization to ensure compliance with the Records Management
Program. • Continue to coordinate efforts to migrate records currently maintained in the Document Management System.
SIGNIFICANT CHANGES:
• Elimination of 1.0 FTE Senior Office Specialist and the addition of 0.5 hourly employee.
Comm Dev
Community Development
Comm Dev
Community Development
Community & Economic DevelopmentypOrg Chart by FunctionCommunity & Economic Development DirectorpHousing & Neighborhood ServicesBuildingEconomic DevelopmentLand Development EngineeringPlanningServicesEngineering
E-1
PROGRAM: COMMUNITY DEVELOPMENT
FUND: VARIOUS
PROGRAM GROUP: VARIOUS SUMMARY
2010-11
ACTUAL
2011-12
ACTUAL
2012-13
BUDGET
2013-14
BUDGET
PERSONNEL $6,836,862 $6,884,996 $6,777,043 $6,478,347
MAINTENANCE & OPERATIONS 10,549,844 10,701,008 9,620,003 9,279,022
CAPITAL OUTLAY 28,615 145,901 0 0
GRAND TOTAL $17,415,321 $17,731,905 $16,397,046 $15,757,369
FULL TIME POSITIONS 65.00 63.00 57.00 54.00
HOURLY/FTE POSITIONS 3.64 3.64 2.64 2.64
COMMUNITY &
ECONOMIC
DEVELOPMENT
43%
HOUSING &
NEIGHBORHOOD
SERVICES
57%
E-2
PROGRAM: COMMUNITY & ECONOMIC DEVELOPMENT
FUND: VARIOUS
PROGRAM GROUP: VARIOUS SUMMARY
2010-11
ACTUAL
2011-12
ACTUAL
2012-13
BUDGET
2013-14
BUDGET
PERSONNEL $5,724,072 $5,598,002 $5,631,652 $5,353,207
MAINTENANCE & OPERATIONS 1,767,443 1,583,964 1,429,960 1,489,521
CAPITAL OUTLAY 28,615 0 0 0
GRAND TOTAL $7,520,130 $7,181,966 $7,061,612 $6,842,728
FULL TIME POSITIONS 54.24 50.05 47.00 44.00
HOURLY/FTE POSITIONS 3.00 3.00 2.00 2.00
ADMINISTRATION
11%
LAND
DEVELOPMENT
ENGINEERING
21%
PLANNING
41%
BUILDING
INSPECTION
21%
ECONOMIC
DEVELOPMENT
6%
E-13
PROGRAM: SCC RDA PROJECTS
FUND: SCC RDA OBLIGATION RETIREMENT FUND
PROGRAM GROUP: COMMUNITY & ECONOMIC DEVELOPMENT ACCT NO. N/A
2010-11
ACTUAL
2011-12
ACTUAL
2012-13
BUDGET
2013-14
BUDGET
PERSONNEL $107,963 $117,921 $0 $0
MAINTENANCE & OPERATIONS 102,945 28,942 0 0
CAPITAL OUTLAY 0 0 0 0
GRAND TOTAL $210,908 $146,863 $0 $0
FULL TIME POSITIONS 0.84 0.65 0.00 0.00
HOURLY/FTE POSITIONS 0.00 0.00 0.00 0.00
This program is no longer active due to the dissolution of the redevelopment agency.
E-14
PROGRAM: HOUSING & NEIGHBORHOOD SERVICES
FUND: VARIOUS
PROGRAM GROUP: VARIOUS SUMMARY
2010-11
ACTUAL
2011-12
ACTUAL
2012-13
BUDGET
2013-14
BUDGET
PERSONNEL $1,112,790 $1,286,994 $1,145,391 $1,125,140
MAINTENANCE & OPERATIONS 8,782,401 9,117,044 8,190,043 7,789,501
CAPITAL OUTLAY 0 145,901 0 0
GRAND TOTAL $9,895,191 $10,549,939 $9,335,434 $8,914,641
FULL TIME POSITIONS 10.76 12.95 10.00 10.00
HOURLY/FTE POSITIONS 0.64 0.64 0.64 0.64
NEIGHBORHOOD
SERVICES
7%
AFFORDABLE
HOUSING
5%
SECTION 8
67%
CDBG
6%
REDEVELOPMENT
15%
E-15
PROGRAM: NEIGHBORHOOD SERVICES
FUND: GENERAL FUND
PROGRAM GROUP: HOUSING & NEIGHBORHOOD SERVICES ACCT NO. 00125XX/
0012910/1502810
2010-11
ACTUAL
2011-12
ACTUAL
2012-13
BUDGET
2013-14
BUDGET
PERSONNEL $229,815 $303,843 $297,985 $301,409
MAINTENANCE & OPERATIONS 170,247 197,067 307,006 307,174
CAPITAL OUTLAY 0 0 0 0
GRAND TOTAL $400,062 $500,910 $604,991 $608,583
FULL TIME POSITIONS 2.21 5.10 2.63 2.78
HOURLY/FTE POSITIONS 0.18 0.20 0.34 0.34
GENERAL FUND $400,062 $499,230 $576,991 $598,583
SPECIAL REVENUE 0 1,680 28,000 10,000
TOTAL FUNDING $400,062 $500,910 $604,991 $608,583
MISSION STATEMENT:
Serving to engage and connect the community, its neighborhoods, and its people in the development and
implementation of programs which provide for affordable housing and help strengthen neighborhoods through
partnerships and collaboration to improve or enhance the quality of life and sense of community within Carlsbad.
PROGRAM ACTIVITIES:
Code Compliance
• Assist residents and provide expertise regarding zoning, housing, building and miscellaneous Municipal Code
inquiries.
Community Funding Program
• Assist community organizations, winning teams and special events that benefit the residents of Carlsbad.
Community Relations Program and Neighborhood Liaisons • Coordinate programs to meet the needs of our diverse community.
• Provide a central point of contact between residents and city government. • Coordinate neighborhood service interdepartmental response teams.
Employment Hiring Center
• Administer contract to provide a hiring center that assists day laborers in obtaining employment.
Neighborhood Organization and Engagement Initiative
• Assist residents and business owners to create neighborhood organizations/associations to assist with
enhancement and/or problem-solving.
• Engage neighborhood leaders in enhancement efforts.
• Assist residents and business owners to address neighborhood issues and concerns.
Volunteer Program
• Recruit and coordinate volunteer services. • Match volunteers with appropriate programs and projects to allow for community problem solving and extension
of city services.
• Encourage an environment of volunteerism throughout the community.
• Manage Mediation Program.
• Manage the CityStuff program and contract.
E-16
PROGRAM: NEIGHBORHOOD SERVICES PAGE TWO
FUND: GENERAL FUND
PROGRAM GROUP: HOUSING & NEIGHBORHOOD SERVICES ACCT NO. 00125XX/
0012910/1502810
KEY ACHIEVEMENTS 2012-13
• Relocated HNS offices to City Hall complex; fully discontinued operations at previous location in the Village Area.
• Developed cooperative neighborhood enhancement program with the Barrio Community; prepared draft
Neighborhood Enhancement Action Plan and initiated meetings with focus groups to obtain final input.
• Developed and implemented the third Halloween on Elm neighborhood celebration in the Village, the second Spring Fiesta neighborhood beautification and a “spruce up” event in the Barrio.
• Completed launch of the Nextdoor.Com social media effort to strengthen connections between neighbors and
neighborhoods, and continued marketing and recruitment efforts.
• In coordination with Junior Achievement, developed and presented a “success skills” program to students at La
Costa Canyon High School, focused on jobs within local government, specifically the City of Carlsbad; this was
an effort to encourage the younger generations to bring their talents and skills, energy and creativity to work in
the public sector.
• Initiated six neighborhood services projects to facilitate resolution of disputes or impacts on quality of life; the
projects include RONPAS and Carlsbad High School, Hanover residents and the new Hilton hotel, Agua
Hedionda Lagoon users and neighbors, and La Costa Meadows Elementary School and neighbors.
• Implemented a new community leadership forum as a pilot project at the Spring Citizens Academy.
KEY GOALS 2013-14
• Establish strong neighborhood connections through various mediums.
• Establish community liaison programs and relationships.
• Modernize Code Compliance and an increase education campaign for programs.
• Continue dissolution actions for the Carlsbad Redevelopment Agency. • Continue expanding the Leadership Academy Program to encourage greater civic engagement by a more
diverse population.
SIGNIFICANT CHANGES:
• None
E-17
PROGRAM: AFFORDABLE HOUSING
FUND: HOUSING TRUST FUND
PROGRAM GROUP: HOUSING & NEIGHBORHOOD SERVICES ACCT NO. 1332621
2010-11
ACTUAL
2011-12
ACTUAL
2012-13
BUDGET
2013-14
BUDGET
PERSONNEL $210,461 $314,490 $291,602 $289,717
MAINTENANCE & OPERATIONS 212,329 208,425 281,642 171,350
CAPITAL OUTLAY 0 145,901 0 0
GRAND TOTAL $422,790 $668,816 $573,244 $461,067
FULL TIME POSITIONS 1.88 2.20 2.62 2.27
HOURLY/FTE POSITIONS 0.12 0.00 0.30 0.30
MISSION STATEMENT:
Serving to engage and connect the community, its neighborhoods, and its people in the development and
implementation of programs which provide for affordable housing and help strengthen neighborhoods through
partnerships and collaboration to improve or enhance the quality of life and sense of community within Carlsbad.
PROGRAM ACTIVITIES:
Affordable Housing Programs
Provide staff support to implement the various affordable housing programs as set forth within the city’s housing
element including:
• Mortgage Credit Certificate Program (MCC).
• Provide staff support to the Housing Commission.
• Participate in the San Diego Regional Housing Task Force.
• Down Payment and Closing Cost Assistance Program.
• Minor Home Repair Program.
• Develop new opportunities for affordable housing.
Affordable Housing Financial Assistance • Negotiate and prepare financial assistance and loan documents for construction of single-family and multi-family
affordable housing projects.
Inclusionary Housing • Implement the Inclusionary Housing Ordinance by providing information to developers, the public, and city staff
on the requirements of the ordinance.
• Negotiate and prepare affordable housing agreements.
• Monitor the development and operation of affordable housing projects.
• Assist with development of affordable housing projects from concept to construction.
KEY ACHIEVEMENTS 2012-13:
• Completed construction of Tavarua Senior Affordable Apartments with new tenants moving in April 1, 2013; a
$3.75 million loan from the Carlsbad Redevelopment Agency was combined with other funding to construct this
50 unit project. The developer was Meta Housing.
• Obtained approval for a $7.4 million property acquisition loan to assist in the purchase of 22 duplexes (44 units
total) in the historic Barrio neighborhood of the Village Area for affordable to low income households; ultimately
the project will result in new construction of 140+ apartment units for low income households. C&C Development
and Irvine Housing Opportunities are the developers.
SIGNIFICANT CHANGES:
• None
E-18
PROGRAM: RENTAL ASSISTANCE
FUND: HUD SECTION 8 HOUSING
PROGRAM GROUP: HOUSING & NEIGHBORHOOD SERVICES ACCT NO. 190XXXX
2010-11
ACTUAL
2011-12
ACTUAL
2012-13
BUDGET
2013-14
BUDGET
PERSONNEL $420,433 $433,887 $375,736 $365,530
MAINTENANCE & OPERATIONS 5,936,540 6,186,225 5,844,178 5,624,856
CAPITAL OUTLAY 0 0 0 0
GRAND TOTAL $6,356,973 $6,620,112 $6,219,914 $5,990,386
FULL TIME POSITIONS 4.25 4.25 3.60 3.60
HOURLY/FTE POSITIONS 0.34 0.30 0.00 0.00
MISSION STATEMENT:
Serving to engage and connect the community, its neighborhoods, and its people in the development and
implementation of programs which provide for affordable housing and help strengthen neighborhoods through
partnerships and collaboration to improve or enhance the quality of life and sense of community within Carlsbad.
PROGRAM ACTIVITIES:
Section 8 Tenant-Based Rental Assistance
• Provide federal funding to subsidize rents for extremely low-income and very low-income households.
• Assist low-income households in the community to access rental housing that is decent, safe, and sanitary.
• Ensure program is being administered in compliance with federal regulations, federal guidelines, the Carlsbad
Administrative Plan, and the Public Housing Agency (PHA) Plan.
• Achieve and maintain a lease rate that effectively utilizes funding allocation.
Family Self-Sufficiency
• To enable unemployed, under-employed or under-educated low-income families to achieve economic
independence from welfare.
• Assist families identify barriers to becoming self-sufficient.
• Provide guidance to families for establishing a five-year goal and plan.
• Coordinate needed support services and act as an advocate on behalf of the client.
PERFORMANCE/WORKLOAD MEASURES:
• Maintain a Section Eight Management Assessment Program (SEMAP) ranking of “standard performer” or “high
performer.” • Achieve and maintain a lease rate utilizing 98% of allocated funds. • Update and revise Administrative Plan to adopt changes in federal regulations. • Expand rental assistance knowledge by conducting community workshops, providing owner and participant
educational opportunities, and conducting owner outreach presentations.
KEY ACHIEVEMENTS 2012-13:
• Provided monthly rental assistance to approximately 600 very low and extremely low-income households.
• Received “High Performer” ranking under SEMAP.
SIGNIFICANT CHANGES:
• None
E-19
PROGRAM: COMMUNITY DEVELOPMENT BLOCK GRANT (CDBG)
FUND: CDBG ENTITLEMENT
PROGRAM GROUP: HOUSING & NEIGHBORHOOD SERVICES ACCT NO. 391XXXX
2010-11
ACTUAL
2011-12
ACTUAL
2012-13
BUDGET
2013-14
BUDGET
PERSONNEL $75,670 $73,822 $67,745 $69,117
MAINTENANCE & OPERATIONS 509,143 1,213,242 472,825 494,073
CAPITAL OUTLAY 0 0 0 0
GRAND TOTAL $584,813 $1,287,064 $540,570 $563,190
FULL TIME POSITIONS 0.59 0.60 0.30 0.50
HOURLY/FTE POSITIONS 0.00 0.00 0.00 0.00
MISSION STATEMENT:
Serving to engage and connect the community, its neighborhoods, and its people in the development and
implementation of programs which provide for affordable housing and help strengthen neighborhoods through
partnerships and collaboration to improve or enhance the quality of life and sense of community within Carlsbad.
PROGRAM ACTIVITIES:
Administration of Community Development Block Grant Program (CDBG)
• Provide staff support to the CDBG Funding Advisory Committee and City Council in the selection process to
identify activities to be included in the consolidated funding plan for the CDBG Program.
• Prepare a consolidated funding plan for submittal to U.S. Department of Housing and Urban Development
(HUD).
• Ensure that documentation is maintained to meet guidelines established by HUD for continued CDBG funding. • Monitor activities of grant sub-recipients to ensure that HUD and city requirements are met. • Prepare Annual Performance and Evaluation Report for review and approval by City Council and HUD.
PERFORMANCE MEASURES:
• Hold four public meetings to review and obtain comments on the city’s CDBG Program.
• Conduct selection process to identify a minimum of ten local public service agencies that should be assisted with
funding through the CDBG Program.
• Monitor grant sub-recipients and maintain documentation necessary to meet federal guidelines.
KEY ACHIEVEMENTS 2012-13:
• Provided funding assistance to 15 nonprofit organizations and assisted over 1,000 Carlsbad residents.
• Met compliance requirements for timely expenditure of funds. • Fully complied with “work out” plan set forth by HUD for expenditure of CDBG funds; met the deadline for
expenditure of funds by reallocating nearly $1 million to Hospice for purchase of a home in Carlsbad.
SIGNIFICANT CHANGES:
• The federal government approved an 8 percent reduction in CDBG funding for 2012-13.
E-20
PROGRAM: SUCCESSOR AGENCY (REDEVELOPMENT) OPERATIONS
VILLAGE AREA
FUND: REDEVELOPMENT RETIREMENT FUND
PROGRAM GROUP: HOUSING & NEIGHBORHOOD SERVICES ACCT NO. 8012410,
8022412
2010-11
ACTUAL
2011-12
ACTUAL
2012-13
BUDGET
2013-14
BUDGET
PERSONNEL $176,411 $160,952 $112,323 $99,367
MAINTENANCE & OPERATIONS 1,954,142 1,312,085 1,284,392 1,192,048
CAPITAL OUTLAY 0 0 0 0
GRAND TOTAL $2,130,553 $1,473,037 $1,396,715 $1,291,415
FULL TIME POSITIONS 1.83 0.80 0.85 0.85
HOURLY/FTE POSITIONS 0.00 0.14 0.00 0.00
MISSION STATEMENT:
Serving to engage and connect the community, its neighborhoods, and its people in the development and
implementation of programs which provide for affordable housing and help strengthen neighborhoods through
partnerships and collaboration to improve or enhance the quality of life and sense of community within Carlsbad.
PROGRAM ACTIVITIES:
• Complete activities associated with dissolution of the Redevelopment Agency.
• Assist with any assigned efforts for neighborhood enhancement programs within the Village Area.
• Continue to administer the storefront improvement grant program, and complete disbursement of all grant funds
to qualified Village business/property owners.
• Complete any projects set forth within the approved Recognized Obligation Payment Schedule (ROPS) and
ensure payment of all debt obligations as set forth by the Oversight Board.
• Coordinate the activities of the Oversight Board, and complete assignments of the Oversight Board.
• Transfer ownership of redevelopment agency property to appropriate agency, or sell said property as set forth by
the Oversight Board.
KEY ACHIEVEMENTS 2012-13
• Completed the required financial audits for the program – housing fund and non-housing fund; paid the surplus
funds to County for distribution to appropriate taxing agencies.
• Prepared and submitted ROPS 3 and 4 for approval by the State of California’s Department of Finance.
• Participated in 3 Meet and Confer sessions with the State of California’s Department of Finance in an effort to
resolve disputes with the State over projects denied, and/or funding issues.
• Completed all required reports and submitted in a timely manner.
• Anticipating “Finding of Completion” to allow for City to be repaid for previous loans to the Agency.
KEY GOALS 2013-14:
• HNS staff will work in coordination with the City Attorney’s Office, Finance Department, the Oversight Board and
the State of California and County of San Diego to ensure proper implementation of the Successor Agency and
take the appropriate actions to dissolve the former redevelopment agency in a timely manner and ensure
repayment of all approved debt obligations.
• Complete approved redevelopment projects as set forth within the certified ROPS and submit all required reports
on dissolution activities to the State of California and the County of San Diego.
SIGNIFICANT CHANGES:
• None
Comm Services
Community Services
Comm Services
Community Services
Community ServicesyOrg Chart by FunctionLibrary and Cultural Arts DirectorParks & Recreation DirectorDove Lane LibraryCole LibraryLearning CenterCultural Arts OfficeParks, Trails & LagoonsRecreation ServicesPark Planning
F-1
PROGRAM: COMMUNITY SERVICES
FUND: VARIOUS
PROGRAM GROUP: VARIOUS SUMMARY
2010-11
ACTUAL
2011-12
ACTUAL
2012-13
BUDGET
2013-14
BUDGET
PERSONNEL $14,422,982 $14,279,144 $14,473,086 $14,834,072
MAINTENANCE & OPERATIONS 17,148,635 17,215,930 17,642,171 17,751,514
CAPITAL OUTLAY 190,283 274,685 0 119,500
GRAND TOTAL $31,761,900 $31,769,759 $32,115,257 $32,705,086
FULL TIME POSITIONS 124.20 122.20 119.65 118.85
HOURLY/FTE POSITIONS 124.26 124.26 118.11 135.09
LIBRARY & ARTS
32%
PARK & RECREATION
68%
F-26
PROGRAM: MEDIAN MAINTENANCE
FUND: MAINTENANCE ASSESSMENT
PROGRAM GROUP: PARKS & RECREATION ACCT NO. 1615024
2010-11
ACTUAL
2011-12
ACTUAL
2012-13
BUDGET
2013-14
BUDGET
PERSONNEL $200,223 $218,700 $207,092 $203,285
MAINTENANCE & OPERATIONS 515,219 540,936 528,666 538,085
CAPITAL OUTLAY 0 0 0 0
GRAND TOTAL $715,442 $759,636 $735,758 $741,370
FULL TIME POSITIONS 1.90 1.90 1.90 1.85
HOURLY/FTE POSITIONS 0.60 0.60 0.60 0.84
WORK PROGRAM:
Provide landscape, irrigation maintenance and litter control for all city medians, including the Downtown Village.
PROGRAM ACTIVITIES:
Median Maintenance • Administer and oversee the landscape and irrigation maintenance of approximately 65 acres of median planters.
Maintenance includes litter control, weed abatement, pruning, shrub/tree replacement, and irrigation
repairs/adjustments.
• Perform citywide inspection and pruning of median trees on a 4-year cycle, and perform inspection and pruning
of high maintenance trees on a 2-year cycle.
Streetscape Maintenance
• Maintain high profile medians and parkways in the Downtown Village (approximately 3 acres), and other areas,
including weed abatement, pruning, shrub/tree replacement, and irrigation repairs/adjustments.
SIGNIFICANT CHANGES:
• None
.
Public Safety
Public Safety
Public Safety
Public Safety
Public Safety yOrg Chart by FunctionPolice ChiefFire ChiefField OperationsInvestigationsSupport ServicesEmergency PreparednessEmergency OperationsSupport ServicesFire PreventionPatrolCommunicationsInformation TechnologyRecordsSpecial Investigations
G-1
PROGRAM: PUBLIC SAFETY
FUND: VARIOUS
PROGRAM GROUP: VARIOUS SUMMARY
2010-11
ACTUAL
2011-12
ACTUAL
2012-13
BUDGET
2013-14
BUDGET
PERSONNEL $35,443,397 $36,337,251 $36,886,194 $37,796,818
MAINTENANCE & OPERATIONS 8,570,289 8,508,954 8,615,357 8,988,307
CAPITAL OUTLAY 229,874 789,694 122,775 115,548
GRAND TOTAL $44,243,560 $45,635,899 $45,624,326 $46,900,673
FULL TIME POSITIONS 250.75 249.75 248.75 249.00
HOURLY/FTE POSITIONS 4.00 4.00 3.69 4.00
FIRE
38%
POLICE
62%
Public Works
Public Works
Public Works
Public Works
Public WorksPublic Works DirectorOrg Chart by FunctionDirectorProperty & Environmental ManagementTransportationUtilitiesFacility MaintenanceSafety Training CenterStreet & Traffic SignalsConstruction Management & InspectionWater OperationsWastewater OperationsEnvironmental ManagementInspectionpStorm Drain MaintenanceStorm Drain EngineeringStorm Water ProtectionSolid Waste ManagementFleet Maintenance & Replacement
H-1
PROGRAM: PUBLIC WORKS
FUND: VARIOUS
PROGRAM GROUP: VARIOUS SUMMARY
2010-11
ACTUAL
2011-12
ACTUAL
2012-13
BUDGET
2013-14
BUDGET
PERSONNEL $16,169,156 $16,449,888 $17,219,589 $16,993,666
MAINTENANCE & OPERATIONS 50,483,490 52,383,989 58,497,307 60,133,642
CAPITAL OUTLAY 757,888 1,568,689 1,224,500 1,237,565
GRAND TOTAL $67,410,534 $70,402,566 $76,941,396 $78,364,873
FULL TIME POSITIONS 169.55 162.55 162.60 159.40
HOURLY/FTE POSITIONS 4.54 3.84 3.84 4.59
TRANSPORTATION
13%
PEM
14%
UTILITIES
73%
H-2
PROGRAM: TRANSPORTATION
FUND: VARIOUS
PROGRAM GROUP: TRANSPORTATION SUMMARY
2010-11
ACTUAL
2011-12
ACTUAL
2012-13
BUDGET
2013-14
BUDGET
PERSONNEL $5,503,828 $5,698,953 $5,918,342 $5,947,539
MAINTENANCE & OPERATIONS 5,192,999 3,945,489 4,184,096 3,878,451
CAPITAL OUTLAY 75,510 77,365 0 0
GRAND TOTAL $10,772,337 $9,721,807 $10,102,438 $9,825,990
FULL TIME POSITIONS 58.40 54.40 54.40 53.40
HOURLY/FTE POSITIONS 2.00 1.00 1.00 1.00
ADMINISTRATION
48%
STORMWATER
INSPECTION
3%
STREET
MAINTENANCE
29%
TRAFFIC SIGNAL
MAINTENANCE
8%STREET LIGHTING
9%
LIGHTING &
LANDSCAPING
DISTRICT NO. 2
3%
Capital Improvement Program
Capital Improvement Program
Capital Improvement Program
Capital Improvement Program
Overview
Overview
Overview
Overview
Schedule of Capital Projects Capital Proj
Schedule of Capital ProjectsCapital Proj
Fund Summary Fund Summary
Fund Summary
Fund Summary
CAPITAL IMPROVEMENT PROGRAM FUND SUMMARY
(1) Equal to projected fund balance less any continuing appropriations.K-1
PRIOR YEAR 1 YEAR 2 YEAR 3 YEAR 4 YEAR 5 YEAR 6-15
YEARS 2013-14 2014-15 2015-16 2016-17 2017-18 2019-28
BEGINNING FUND BALANCE (1)N/A 9,140,501 9,665,096 10,080,256 10,164,806 10,249,356 10,333,906
REVENUES
DEVELOPER FEES/FEDERAL GRANT 524,595 1,851,160 84,550 84,550 84,550 5,647,394
TOTAL REVENUES N/A 524,595 1,851,160 84,550 84,550 84,550 5,647,394
CAPITAL PROJECTS
POINSETTIA LANE - REACH E 650,000 - 1,436,000 - - - 12,736,000
POINSETTIA LANE - REACHES A,B,C,F,G & AVIARA PKWY REIMB - - - - - - 1,489,400
TOTAL PROJECT EXPENDITURES 650,000 - 1,436,000 - - - 14,225,400
ENDING FUND BALANCE N/A 9,665,096 10,080,256 10,164,806 10,249,356 10,333,906 1,755,900
PRIOR YEAR 1 YEAR 2 YEAR 3 YEAR 4 YEAR 5 YEAR 6-15
YEARS 2013-14 2014-15 2015-16 2016-17 2017-18 2019-28
BEGINNING FUND BALANCE (1)N/A 185,929 286,180 286,180 286,180 300,270 314,360
REVENUES
DEVELOPER FEES 100,251 - - 14,090 14,090 3,926,545
TOTAL REVENUES N/A 100,251 - - 14,090 14,090 3,926,545
CAPITAL PROJECTS
N/A - - - - - - -
TOTAL PROJECT EXPENDITURES - - - - - - -
ENDING FUND BALANCE N/A 286,180 286,180 286,180 300,270 314,360 4,240,905
PRIOR YEAR 1 YEAR 2 YEAR 3 YEAR 4 YEAR 5 YEAR 6-15
YEARS 2013-14 2014-15 2015-16 2016-17 2017-18 2019-28
BEGINNING FUND BALANCE (1)N/A 51,983,573 53,136,745 54,179,936 54,881,981 55,377,026 55,960,419
REVENUES
DEVELOPER SPECIAL TAXES 1,263,172 1,153,191 812,045 495,045 583,393 6,367,260
TOTAL REVENUES N/A 1,263,172 1,153,191 812,045 495,045 583,393 6,367,260
CAPITAL PROJECTS
CFD#1 ADMINISTRATION - 110,000 110,000 110,000 - - -
CIVIC CENTER 100,000 - - - - - 28,201,400
LIBRARY EXPANSION (COLE)- - - - - - 5,166,500
LOAN - CFD #1 TO TIF 2,597,039 - - - - - -
MAINTENANCE AND OPERATIONS CENTER 17,080,264 - - - - - -
VETERAN'S MEMORIAL PARK (CITYWIDE ALL QUADRANTS)- - - - - - 23,240,000
TOTAL PROJECT EXPENDITURES 19,777,303 110,000 110,000 110,000 - - 56,607,900
ENDING FUND BALANCE N/A 53,136,745 54,179,936 54,881,981 55,377,026 55,960,419 5,719,779
BTD NO. 2 AVIARA PARKWAY - POINSETTIA LANE
COMMUNITY FACILITIES DISTRICT NO. 1 (CFD 1)
BTD NO. 3 CANNON ROAD WEST
CAPITAL IMPROVEMENT PROGRAM FUND SUMMARY
(1) Equal to projected fund balance less any continuing appropriations.K-2
PRIOR YEAR 1 YEAR 2 YEAR 3 YEAR 4 YEAR 5 YEAR 6-15
YEARS 2013-14 2014-15 2015-16 2016-17 2017-18 2019-28
BEGINNING FUND BALANCE (1)N/A 6,355,125 3,846,288 3,746,352 2,333,280 2,389,108 3,340,124
REVENUES
GAS TAX AND PROP 42 FUNDS 3,124,163 3,155,404 3,186,958 3,218,828 3,251,016 34,352,957
TOTAL REVENUES N/A 3,124,163 3,155,404 3,186,958 3,218,828 3,251,016 34,352,957
CAPITAL PROJECTS
BATIQUITOS DRIVE SLOPE STABILIZATION 40,100 - - - - - -
CARLSBAD BOULEVARD MEDIAN-TAMARACK AVENUE TO PINE AVENUE - - - - - - 2,383,400
COASTAL RAIL TRAIL (ROUNDABOUT NORTHERLY CITY LIMITS) - 793,000 - - - - -
CONCRETE REPAIR WORK 750,000 - - - - - -
CONCRETE REPAIR/REPLACEMENT PROGRAM 1,250,000 250,000 250,000 250,000 250,000 250,000 2,500,000
EL CAMINO REAL AND COLLEGE BLVD INTERSECTION IMPROVEMENTS - - - 515,000 - - -
EL CAMINO REAL MEDIANS 1,135,000 - - 849,530 - - -
GAS TAX TRANSFER TO GENERAL FUND (TRANSPORTATION OPERATING BUDGET)- 600,000 600,000 600,000 600,000 600,000 6,000,000
LA COSTA AVE - TRAFFIC CALMING - - - - 863,000 - -
LA COSTA AVE SLOPE REPAIR WEST OF ROMERIA 204,000 5,000 - - - - -
MARCA DRIVE DRAINAGE IMPROVEMENTS 65,000 - - - - - -
MUTCD STREET NAME SIGN REPLACEMENT 756,217 - - - - - -
NW QUADRANT STORM DRAIN IMPROVEMENT PROGRAM 3,083,254 2,140,000 130,340 155,500 - - -
PALOMAR AIRPORT RD/PASEO DEL NORTE LEFT TURN LANE 233,000 - - - - - -
PALOMAR AIRPORT RD/PASEO DEL NORTE RIGHT TURN LANE 564,000 - - - - - -
PAVEMENT MANAGEMENT PROGRAM 4,818,128 1,170,000 1,400,000 1,450,000 1,450,000 1,450,000 14,500,000
PEDESTRIAN CROSSING - CARLSBAD BLVD./VILLAGE 200,000 - - - - - -
RETROREFLECTIVITY SIGN REPLACEMENT PROGRAM 1,150,000 475,000 475,000 220,000 - - -
ROMERIA DRAINAGE IMPROVEMENTS 338,000 10,000 - - - - -
TRAF SIG - ALGA ROAD AND CAZADERO - - - - - - 210,000
TRAF SIG - ARAMADA DRIVE AND FLEET STREET (S) - - - - - - 190,000
TRAF SIG - ARMADA DRIVE AND GRAND PACIFIC RESORTS - - - - - - 190,000
TRAF SIG - AVIARA PARKWAY-POINSETTIA LANE TO EL CAMINO REAL 11,033 - - 180,000 - - -
TRAF SIG - CAMINO DE LOS COCHES AND LA COSTA AVENUE - 190,000 - - - - -
TRAF SIG - CAMINO VIDA ROBLE AND YARROW DRIVE - - - - - - 190,000
TRAF SIG - CANNON ROAD AND COLLEGE BOULEVARD (DEVELOPER CONSTR) 80,000 - - - - - -
TRAF SIG - EL FUERTE ST AND LOKER AVENUE 210,000 - - - - - -
TRAF SIG - EL FUERTE ST AND RANCHO PANCHO - - - 190,000 - - -
TRAF SIG - FARADAY AVE. AND CAMINO HILLS DRIVE - - 190,000 - - - -
TRAF SIG - FARADAY AVENUE AND PALMER WAY - - - 190,000 - - -
TRAF SIG - LA COSTA AVENUE AND LEVANTE - - 210,000 - - - -
TRAF SIG - MONROE STREET AND HOSP WAY - - - - - - 210,000
TRAF SIG - POINSETTIA LANE AND BRIGANTINE ROAD - - - - - - 190,000
TRAF SIG - TAMARACK AVE. AND VALLEY STREET - - - - - - 190,000
14,887,732 5,633,000 3,255,340 4,600,030 3,163,000 2,300,000 26,753,400
ENDING FUND BALANCE N/A 3,846,288 3,746,352 2,333,280 2,389,108 3,340,124 10,939,681
GAS TAX FUND
CAPITAL IMPROVEMENT PROGRAM FUND SUMMARY
(1) Equal to projected fund balance less any continuing appropriations.K-3
PRIOR YEAR 1 YEAR 2 YEAR 3 YEAR 4 YEAR 5 YEAR 6-15
YEARS 2013-14 2014-15 2015-16 2016-17 2017-18 2019-28
BEGINNING FUND BALANCE (1)N/A 37,777,990 29,855,184 29,855,184 29,855,184 29,855,184 29,855,184
REVENUES
TRANSFERS, REPAYMENTS, OTHER 1,447,800 - - - - -
TOTAL REVENUES N/A 1,447,800 - - - - -
CAPITAL PROJECTS
AGUA HEDIONDA CHANNEL (PLDA "B" - FACILITY B + BN)975,340 - - - - - -
ALGA NORTE PARK - POOL - PHASE 1 (PROP C FUNDS)11,792,796 - - - - - -
ALGA NORTE PARK - POOL - PHASE 2 - - - - - - 6,180,000
ALGA NORTE PARK - POOL - PHASE 2 (PROP C FUNDS)676,498 - - - - - 3,858,900
ARROYO VISTA TRAIL EXTENSION (PROP C)- 235,000 - - - - -
ASSET MANAGEMENT PLAN (STORM DRAINS)82,182 - - - - - -
BARRIO STREET LIGHTING - 100,000 - - - - -
CAMINO HILLS AND JACKSPAR DRIVE SLOPE STABILIZATION 859,400 - - - - - -
CARLSBAD BLVD. REALIGNMENT 250,000 - - - - - -
CITY ADMIN TRAINING FACILITY (PRE-DESIGN) - PROP C - - - - - - 100,000
COLE LIBRARY IMPROVEMENTS - 1,070,194 - - - - -
COLE LIBRARY IMPROVEMENTS (BROWNLEY DONATION)- 629,806 - - - - -
DOVE LIBRARY IMPROVEMENTS - 1,301,000 - - - - -
FIRE STATIONS 1 THRU 5 DRAINAGE SYSTEMS 225,000 - - - - - -
HUMAN CAPITAL MANAGEMENT SYSTEM 3,190,000 - - - - - -
JOINT FIRST RESPONDERS TRAINING FACILITY 2,850,000 - - - - - -
JOINT FIRST RESPONDERS TRAINING FACILITY - PHASE II - - - - - - 8,446,000
JOINT FIRST RESPONDERS TRAINING FACILITY - PROP C 13,650,000 - - - - - -
LAKE CALAVERA SOUTH TRAIL IMPROVEMENTS 131,000 - - - - - -
LAKE CALAVERA TRAILS MASTER PLAN/CONSTRUCTION 598,749 - - - - - -
LIBRARY EXPANSION (COLE/BROWNLEY DONATION)- - - - - - 1,000,000
OPEN SPACE AND TRAILS (PROP C)- 4,686,806 - - - - -
PALOMAR AIRPORT RD. AND COLLEGE BLVD. INTERSECTION IMPROV.250,500 - - - - - -
PARK DRIVE RETAINING WALL AND STREET IMPROVEMENTS 243,000 - - - - - -
POLICE CAD IMPLEMENTATION 2,312,227 - - - - - -
RAISE BURIED STORM DRAIN CLEANOUTS 50,000 - - - - - -
ROMERIA DRAINAGE IMPROVEMENTS 299,000 - - - - - -
TRAFFIC SIGNAL PROGRAM 912,000 - - - - - -
UNDERGROUND DIST. 17 - HARDING, ROOSEVELT 509,800 - - - - - -
VILLAGE AND BARRIO BIKE AND PEDESTRIAN WAYFINDING - 250,000 - - - - -
VILLAGE AND BARRIO TRAFFIC CIRCLES - 315,000 - - - - -
VILLAGE DECORATIVE LIGHTING - 177,800 - - - - -
VILLAGE PARKING WAYFINDING - 105,000 - - - - -
VILLAGE SAFETY LIGHTING - 210,000 - - - - -
VILLAGE STREETSCAPE - 290,000 - - - - -
TOTAL PROJECT EXPENDITURES 39,857,492 9,370,606 - - - - 19,584,900
N/A 29,855,184 29,855,184 29,855,184 29,855,184 29,855,184 10,270,284
PRIOR YEAR 1 YEAR 2 YEAR 3 YEAR 4 YEAR 5 YEAR 6-15
YEARS 2013-14 2014-15 2015-16 2016-17 2017-18 2019-28
BEGINNING FUND BALANCE (1)N/A - - - - - -
REVENUES
GRANT REVENUE 1,644,357 - - - - -
TOTAL REVENUES N/A 1,644,357 - - - - -
CAPITAL PROJECTS
CARLSBAD BLVD BRIDGE CONCRETE BARRIER POWER PLANT 149,394 883,088 - - - - -
CARLSBAD BLVD BRIDGE CONCRETE BARRIER RAILROAD 218,006 761,269 - - - - -
COASTAL RAIL TRAIL (ROUNDABOUT NORTHERLY CITY LIMITS) (CMAQ)4,482,195 - - - - - -
PEDESTRIAN RAILWAY CROSSING 15,315 - - - - - -
TOTAL PROJECT EXPENDITURES 4,864,910 1,644,357 - - - - -
ENDING FUND BALANCE N/A - - - - - -
GENERAL CAPITAL CONSTRUCTION (GCC)
GRANTS - FEDERAL
CAPITAL IMPROVEMENT PROGRAM FUND SUMMARY
(1) Equal to projected fund balance less any continuing appropriations.K-4
PRIOR YEAR 1 YEAR 2 YEAR 3 YEAR 4 YEAR 5 YEAR 6-15
YEARS 2013-14 2014-15 2015-16 2016-17 2017-18 2019-28
BEGINNING FUND BALANCE (1)N/A 69,023,111 72,795,861 79,044,861 86,315,861 93,512,861 101,596,861
REVENUES
GENERAL FUND TRANSFER 7,800,000 8,114,000 8,491,000 8,822,000 9,134,000 101,710,000
TOTAL REVENUES N/A 7,800,000 8,114,000 8,491,000 8,822,000 9,134,000 101,710,000
CAPITAL PROJECTS
BEACH ACCESS STAIRS REPLACEMENT 517,500 - - - - - -
CITY HALL ELECTRICAL PANEL UPGRADES 85,000 - - - - - -
CIVIC CENTER - - - - - - 976,400
CMP REHABILITATION PROGRAM 2,859,360 - - - - - -
COLE LIBRARY REFURBISHMENTS - 1,553,750 - - - - -
DOVE LIBRARY REFURBISHMENTS - 500,000 - - - - -
FARADAY EXTERIOR REFURBISHMENT - 40,000 - - - - -
HARDING CENTER REFURBISHMENT - 100,000 - - - - -
HOLIDAY PARK FACILITIES MAINTENANCE - 50,000 - - - - -
KELLY DRIVE CHANNEL REPAIR 1,161,000 - - - - - -
KELLY DRIVE CHANNEL REPLACEMENT - - - - - - 1,822,600
LA COSTA AVE DRAINAGE IMPROVEMENT PROJECT 492,150 - - - - - -
PARK ATHLETIC FIELD LIGHTING RETROFITS - 756,000 - - - - -
PARKING LOT MAINTENANCE PROGRAM - 310,000 375,000 420,000 425,000 - -
ROOF RENOVATION/REPLACEMENT - DOVE LIBRARY & LAS PALMAS - - - - - - -
ROOF REPLACEMENT AT THE RAILROAD DEPOT (VISITOR CENTER)150,000 - - - - - -
SAFETY CENTER EXTERIOR WATERPROOFING 145,000 - - - - - -
SENIOR CENTER REFURBISHMENT - 52,000 - - - - -
SYNTHETIC TURF REPLACEMENT: POINSETTIA PARK SOCCER FIELD - 665,500 - - - - -
TRAF SIG - EL CAMINO REAL AND CHESTNUT SIGNAL REPAIRS 276,000 - - - - - -
TRAF SIG - EL CAMINO REAL AND TAMARACK SIGNAL REPAIRS 200,000 - - - - - -
TRAFFIC SIGNAL PROGRAM 4,772,974 - - - - - -
FUTURE FACILITIES MAINTENANCE PROJECTS - - 1,490,000 800,000 1,200,000 1,050,000 10,000,000
TOTAL PROJECT EXPENDITURES 10,658,984 4,027,250 1,865,000 1,220,000 1,625,000 1,050,000 12,799,000
ENDING FUND BALANCE N/A 72,795,861 79,044,861 86,315,861 93,512,861 101,596,861 190,507,861
PRIOR YEAR 1 YEAR 2 YEAR 3 YEAR 4 YEAR 5 YEAR 6-15
YEARS 2013-14 2014-15 2015-16 2016-17 2017-18 2019-28
BEGINNING FUND BALANCE (1)N/A 1,391,988 1,391,988 1,391,988 1,089,988 1,089,988 1,089,988
REVENUES
OTHER FINANCING SOURCES 1,367,000 - - 350,000 - 2,188,800
TOTAL REVENUES N/A 1,367,000 - - 350,000 - 2,188,800
CAPITAL PROJECTS
COASTAL RAIL TRAIL (ROUNDABOUT NORTHERLY CITY LIMITS) SANDAG ATG GRANT - 800,000 - - - - -
COLLEGE BLVD REACH A AND CANNON REACH 4A 1,713,000 - - - - - -
COLLEGE/CANNON ASSESSMENT DISTRICT 10,314,481 - - - - - -
CREST DRIVE SEWER EXTENSION - - - - 350,000 - -
EL CAMINO REAL WIDENING - LISA STREET TO CRESTVIEW DR - - - - - - 2,188,800
QUARRY CREEK SEWER EXTENSION (SBA "A" - REIMB. AGREEMENT)- 567,000 - - - - -
TRAF SIG - AVIARA PARKWAY-POINSETTIA LANE TO EL CAMINO REAL 343,356 - - 302,000 - - -
TOTAL PROJECT EXPENDITURES 12,370,837 1,367,000 - 302,000 350,000 - 2,188,800
ENDING FUND BALANCE N/A 1,391,988 1,391,988 1,089,988 1,089,988 1,089,988 1,089,988
OTHER
INFRASTRUCTURE MAINTENANCE & REPLACEMENT (IM&R)
CAPITAL IMPROVEMENT PROGRAM FUND SUMMARY
(1) Equal to projected fund balance less any continuing appropriations.K-5
PRIOR YEAR 1 YEAR 2 YEAR 3 YEAR 4 YEAR 5 YEAR 6-15
YEARS 2013-14 2014-15 2015-16 2016-17 2017-18 2019-28
BEGINNING FUND BALANCE (1)N/A 898,029 898,029 748,029 748,029 1,015,319 1,801,152
REVENUES
DEVELOPER FEES - - - 267,290 785,833 5,361,837
TOTAL REVENUES N/A - - - 267,290 785,833 5,361,837
CAPITAL PROJECTS
LOAN: PIL-NE TO PFF FOR PARK SITE ACQUISITION - - - - - - 4,550,000
ROBERTSON RANCH PARK DEVELOPMENT (PARTIAL FUNDING)- - 150,000 - - - 2,550,000
TOTAL PROJECT EXPENDITURES - - 150,000 - - - 7,100,000
ENDING FUND BALANCE N/A 898,029 748,029 748,029 1,015,319 1,801,152 62,989
PRIOR YEAR 1 YEAR 2 YEAR 3 YEAR 4 YEAR 5 YEAR 6-15
YEARS 2013-14 2014-15 2015-16 2016-17 2017-18 2019-28
BEGINNING FUND BALANCE (1)N/A 173,723 280,798 430,703 573,470 716,237 866,142
REVENUES
DEVELOPER FEES 107,075 149,905 142,767 142,767 149,905 3,512,068
TOTAL REVENUES N/A 107,075 149,905 142,767 142,767 149,905 3,512,068
CAPITAL PROJECTS
PINE AVENUE PARK - PINE COMMUNITY BUILDING - PHASE II - - - - - - 1,900,400
TOTAL PROJECT EXPENDITURES - - - - - - 1,900,400
ENDING FUND BALANCE N/A 280,798 430,703 573,470 716,237 866,142 2,477,810
PRIOR YEAR 1 YEAR 2 YEAR 3 YEAR 4 YEAR 5 YEAR 6-15
YEARS 2013-14 2014-15 2015-16 2016-17 2017-18 2019-28
BEGINNING FUND BALANCE (1)N/A 1,317,506 1,322,852 1,328,198 1,344,235 474,172 495,555
REVENUES
DEVELOPER FEES 5,346 5,346 16,037 16,037 21,383 187,103
TOTAL REVENUES N/A 5,346 5,346 16,037 16,037 21,383 187,103
CAPITAL PROJECTS
LEO CARRILLO PARK - PHASE III - - - - 886,100 - -
TOTAL PROJECT EXPENDITURES - - - - 886,100 - -
ENDING FUND BALANCE N/A 1,322,852 1,328,198 1,344,235 474,172 495,555 682,658
PRIOR YEAR 1 YEAR 2 YEAR 3 YEAR 4 YEAR 5 YEAR 6-15
YEARS 2013-14 2014-15 2015-16 2016-17 2017-18 2019-28
BEGINNING FUND BALANCE (1)N/A 1,650,429 1,773,382 1,901,681 1,928,410 1,960,485 1,987,214
REVENUES
DEVELOPER FEES 122,953 128,299 26,729 32,075 26,729 1,261,608
TOTAL REVENUES N/A 122,953 128,299 26,729 32,075 26,729 1,261,608
CAPITAL PROJECTS
AVIARA COMMUNITY PARK COMMUNITY BUILDING - - - - - - 2,956,100
AVIARA REIMBURSEMENT AGREEMENT 238,000 - - - - - -
TOTAL PROJECT EXPENDITURES 238,000 - - - - - 2,956,100
N/A 1,773,382 1,901,681 1,928,410 1,960,485 1,987,214 292,722
PARK-IN-LIEU NE
PARK-IN-LIEU SW
PARK-IN-LIEU SE
PARK-IN-LIEU NW
CAPITAL IMPROVEMENT PROGRAM FUND SUMMARY
(1) Equal to projected fund balance less any continuing appropriations.K-6
PRIOR YEAR 1 YEAR 2 YEAR 3 YEAR 4 YEAR 5 YEAR 6-15
YEARS 2013-14 2014-15 2015-16 2016-17 2017-18 2019-28
BEGINNING FUND BALANCE (1)N/A 2,734,320 2,777,484 2,777,484 2,777,484 2,805,684 2,826,948
REVENUES
DEVELOPER FEES 43,164 - - 28,200 21,264 1,378,884
TOTAL REVENUES N/A 43,164 - - 28,200 21,264 1,378,884
CAPITAL PROJECTS
BUSINESS PARK RECREATIONAL FACILITY (PARTIAL FUNDING)- - - - - - 4,202,400
TOTAL PROJECT EXPENDITURES - - - - - - 4,202,400
ENDING FUND BALANCE N/A 2,777,484 2,777,484 2,777,484 2,805,684 2,826,948 3,432
PRIOR YEAR 1 YEAR 2 YEAR 3 YEAR 4 YEAR 5 YEAR 6-15
YEARS 2013-14 2014-15 2015-16 2016-17 2017-18 2019-28
BEGINNING FUND BALANCE (1)N/A 3,544,717 3,544,970 2,866,540 3,027,473 3,290,361 3,727,908
REVENUES
DEVELOPER FEES 322,253 168,183 160,933 262,888 437,547 8,407,725
TOTAL REVENUES N/A 322,253 168,183 160,933 262,888 437,547 8,407,725
CAPITAL PROJECTS
AGUA HEDIONDA CHANNEL (PLDA "B" - FACILITY B + BN)4,498,109 100,000 - - - - -
CARLSBAD BOULEVARD ENCINAS CREEK BRIDGE REPLACEMENT (PLDA "C" - C1)2,539,566 - - - - - -
COLLEGE BLVD. BRIDGE (REIMB./PLDA "B" - FACILITY BL-L )- - - - - - 1,816,101
MASTER DRAINAGE PLAN PROJECT AAA (Jefferson Street)- - - - - - 289,534
MASTER DRAINAGE PLAN PROJECT AAAA (Madison Street)- - - - - - 416,500
MASTER DRAINAGE PLAN PROJECT AC (Hosp Grove)130,000 - - - - - 862,913
MASTER DRAINAGE PLAN PROJECT AFA (Hidden Valley Drainage Restoration)- - - - - - 91,608
MASTER DRAINAGE PLAN PROJECT AFB (Calavera Hills Drainage Restoration)- - - - - - 163,164
MASTER DRAINAGE PLAN PROJECT BB 1 and 2 (Washington Street)- - - - - - 1,086,065
MASTER DRAINAGE PLAN PROJECT BCB (Magnolia Avenue)- - - - - - 468,096
MASTER DRAINAGE PLAN PROJECT BFA (Country Store)- - - - - - 963,673
MASTER DRAINAGE PLAN PROJECT BFB-U (El Camino Real)- - - - - - 138,220
MASTER DRAINAGE PLAN PROJECT BJ B, BNB AND BJ-1 2,761,644 - - - - - -
MASTER DRAINAGE PLAN PROJECT BL-U (College Blvd. Drainage)- - - - - - 384,509
MASTER DRAINAGE PLAN PROJECT BM (College Blvd./Canatarini Box Culvert)- - - - - - 204,077
MASTER DRAINAGE PLAN PROJECT BQ (Sunnycreek Road)- - - - - - 131,355
MASTER DRAINAGE PLAN PROJECT BR (Canatarini/College Blvd.)- - - - - - 180,773
MASTER DRAINAGE PLAN PROJECT C2 (Paseo Del Norte)- - - - - - 727,730
MASTER DRAINAGE PLAN PROJECT CA (Avenida Encinas)- - - - - - 529,402
MASTER DRAINAGE PLAN PROJECT DBA (Poinsettia Village)- - - - - - 167,215
MASTER DRAINAGE PLAN PROJECT DBB (Avenida Encinas)- - - - - - 429,108
MASTER DRAINAGE PLAN PROJECT DFA (Batiquitos Lagoon)- - - - - - 256,423
MASTER DRAINAGE PLAN PROJECT DH (Altiva Place Canyon)- - - - - - 232,812
MASTER DRAINAGE PLAN PROJECT DQB (La Costa Town Center)- - - - - - 745,842
MASTER DRAINAGE PLAN PROJECT DZ (Poinsettia Lane)- - - - - - 642,063
PARK DRIVE AND TAMARACK AVENUE STORM DRAIN BCA (PLDA "B")- 222,000 846,613 - - - -
TAMARACK AND ECR STORM DRAIN AND SILT. BASIN (REIMB./PLDA "B" - BFB-L + BF-1)- - - - - - 904,329
TOTAL PROJECT EXPENDITURES 9,929,319 322,000 846,613 - - - 11,831,512
ENDING FUND BALANCE N/A 3,544,970 2,866,540 3,027,473 3,290,361 3,727,908 304,121
PARK FEE ZONES 5,13,16
PLANNED LOCAL DRAINAGE AREA FEES (PLDA)
CAPITAL IMPROVEMENT PROGRAM FUND SUMMARY
(1) Equal to projected fund balance less any continuing appropriations.K-7
PRIOR YEAR 1 YEAR 2 YEAR 3 YEAR 4 YEAR 5 YEAR 6-15
YEARS 2013-14 2014-15 2015-16 2016-17 2017-18 2019-28
BEGINNING FUND BALANCE (1)N/A 18,523,911 18,647,269 19,328,379 19,945,889 19,892,119 21,051,441
REVENUES
DEVELOPER FEES 845,358 761,110 727,510 813,230 1,159,322 23,516,625
TOTAL REVENUES N/A 845,358 761,110 727,510 813,230 1,159,322 23,516,625
CAPITAL PROJECTS
ALGA NORTE PARK - PARK (30 ACRES) - PHASE 1 22,107,510 - - - - - -
ALGA NORTE PARK - POOL - PHASE 1 6,099,695 - - - - - -
AVIARA COMMUNITY PARK COMMUNITY BUILDING - - - - - - 8,609,800
EL CAMINO REAL MEDIANS 909,500 - - - - - -
FIRE STATION #3 RELOCATION 8,630,000 722,000 - - - - -
FIRE STATION #6 (PERMANENT)5,324,100 - - - - - -
LEO CARRILLO PARK - PHASE III - - 80,000 110,000 867,000 - -
LIBRARY EXPANSION (COLE)- - - - - - 10,603,900
PFF LOAN TO PIL-NE FOR PARK SITE ACQUISITION 4,550,000 - - - - - -
PINE AVENUE PARK - PINE COMMUNITY BUILDING - PHASE II - - - - - - 8,590,200
POINSETTIA COMMUNITY PARK -PHASE III 1,072,725 - - - - - 15,410,900
TRAF SIG - CANNON ROAD AND AVENIDA ENCINAS-REIMB.150,000 - - - - - -
TOTAL PROJECT EXPENDITURES 48,843,530 722,000 80,000 110,000 867,000 - 43,214,800
ENDING FUND BALANCE N/A 18,647,269 19,328,379 19,945,889 19,892,119 21,051,441 1,353,266
PRIOR YEAR 1 YEAR 2 YEAR 3 YEAR 4 YEAR 5 YEAR 6-15
YEARS 2013-14 2014-15 2015-16 2016-17 2017-18 2019-28
BEGINNING FUND BALANCE (1)N/A 7,248,085 7,512,908 7,838,508 7,838,508 7,838,508 8,201,108
REVENUES
DEVELOPER SPECIAL TAXES/OTHER AGENCIES 264,823 325,600 - - 362,600 916,690
TOTAL REVENUES N/A 264,823 325,600 - - 362,600 916,690
CAPITAL PROJECTS
RANCHO SANTA FE ROAD NORTH - PHASE II (BRIDGE)20,671,000 - - - - - -
TOTAL PROJECT EXPENDITURES 20,671,000 - - - - - -
ENDING FUND BALANCE N/A 7,512,908 7,838,508 7,838,508 7,838,508 8,201,108 9,117,798
PUBLIC FACILITY FEE FUND (PFF)
RANCHO SANTA FE ROAD PROJECT
CAPITAL IMPROVEMENT PROGRAM FUND SUMMARY
(1) Equal to projected fund balance less any continuing appropriations.K-8
PRIOR YEAR 1 YEAR 2 YEAR 3 YEAR 4 YEAR 5 YEAR 6-15
YEARS 2013-14 2014-15 2015-16 2016-17 2017-18 2019-28
BEGINNING FUND BALANCE (1)N/A 3,579,194 2,826,135 410,660 138,368 518,307 811,669
REVENUES
DEVELOPER FEES AND MISC.225,360 175,916 3,048,081 188,739 315,362 5,500,686
OTHER AGENCY CONTRIBUTIONS (CITY OF VISTA)- - 2,408,627 963,200 - -
TOTAL REVENUES N/A 225,360 175,916 5,456,708 1,151,939 315,362 5,500,686
CAPITAL PROJECTS
FARADAY/EL CAMINO REAL SEWER REPLACEMENT - - 140,000 1,400,000 - - -
LAS PALMAS TRUNK SEWER - - 430,000 1,990,000 - - -
LOAN REPAY - SEWER CONN TO SEWER REPL - - - - - - 2,000,000
MARRON ROAD SEWER REPLACEMENT - - 350,000 - - - -
PHASE IV EXPANSION - DEBT SERVICE - 928,419 925,191 - - - -
PHASE V EXPANSION 10,910,358 - - - - - -
SEWER CAPACITY MONITORING PROGRAM 204,000 50,000 50,000 22,000 22,000 22,000 220,000
VISTA/CARLSBAD BUENA VISTA LIFT STATION IMPROVEMENTS - - 100,000 225,000 750,000 - -
VISTA/CARLSBAD INTER. BUENA VISTA LS/FORCEMAIN (VC-4)5,725,000 - - - - - -
VISTA/CARLSBAD INTER. HEDIONDA LS AND FORCEMAIN (VC12-VC13)23,700,000 - - - - - -
VISTA/CARLSBAD INTERCEPTOR REACH VC11B 6,930,000 - - - - - -
VISTA/CARLSBAD INTERCEPTOR REACH VC14 TO VC15 16,100,000 - - - - - -
VISTA/CARLSBAD INTERCEPTOR REPLACEMENT REACH 3 - - 596,200 2,092,000 - - -
TOTAL PROJECT EXPENDITURES 63,569,358 978,419 2,591,391 5,729,000 772,000 22,000 2,220,000
ENDING FUND BALANCE N/A 2,826,135 410,660 138,368 518,307 811,669 4,092,355
PRIOR YEAR 1 YEAR 2 YEAR 3 YEAR 4 YEAR 5 YEAR 6-15
YEARS 2013-14 2014-15 2015-16 2016-17 2017-18 2019-28
BEGINNING FUND BALANCE (1)N/A 14,761,838 13,007,102 10,858,035 1,353,939 2,117,681 1,737,313
REVENUES
TRANSFER FROM OPERATING FUND 3,654,660 3,727,753 3,802,308 3,878,354 3,955,921 46,261,151
TOTAL REVENUES N/A 3,654,660 3,727,753 3,802,308 3,878,354 3,955,921 46,261,151
CAPITAL PROJECTS
ASSET MANAGEMENT PLAN 82,182 - - - - - -
AVENIDA ENCINAS GRAVITY SEWER 150,000 - - - - - -
BATIQUITOS LIFT STATION PUMP REPLACEMENT 250,000 - - - - - -
BUENA INTERCEPTOR SEWER ACCESS ROAD IMPROVEMENTS - - 150,000 - - - -
BUENA INTERCEPTOR SEWER REALIGNMENT - EAST SEGMENT - - 507,000 1,480,000 - - -
BUENA INTERCEPTOR SEWER/MANHOLE REHABILITATION 207,899 - 1,654,101 1,964,000 - - -
BUENA INTERDEPTOR REHAB AT ENCINA PLANT (REIMB)100,000 - - 3 - - -
CALAVERA HILLS TREATMENT PLANT - DEMOLITION 723,500 - - - - - -
CHINQUAPIN LS FORCE MAIN OUTFALL REALIGNMENT - - 60,000 152,000 - - -
ENCINA CAPITAL PROJECTS 9,297,750 2,495,396 1,979,719 4,494,401 2,684,612 3,906,289 34,090,690
FLOW METER REPLACEMENT AT EIGHT LIFT STATIONS 100,000 - - - - - -
FOXES LANDING LIFT STATION WETWELL AND PUMP REPLACEMENT 750,000 1,900,000 - - - - -
FOXES LIFT STATION FORCEMAIN REHABILITATION 25,000 - 200,000 - - - -
GATESHEAD LIFT STATION REMOVAL - 74,000 - - - - -
HOME PLANT PIPELINE AND LIFT STATION REPLACEMENT 4,139,000 - - - - - -
LOAN - SEWER REPL TO SEWER CONN - - - 2,000,000 - - -
MAINTENANCE AND OPERATIONS CENTER 3,861,000 - - - - - -
NORTH AGUA HEDIONDA INTERCEPTOR - WEST SEGMENT 5,854,000 - - - - - -
NORTH AGUA HEDIONDA TRUNK SEWER REACH NAHT1A (SBA "B")2,862,000 - - - - - -
NORTH BATIQUITOS ACCESS ROAD IMPROVEMENTS - - 250,000 - - - -
NORTH BATIQUITOS LIFT STATION FORCEMAIN REHABILITATION - - 115,000 435,000 - - -
OCCIDENTAL SEWER IMPROVEMENTS 849,000 - - - - - -
ODOR AND CORROSION PREVENTION ASSESSMENT 100,000 - - - - - -
POINSETTIA LANE LIFT STATION EMERGENCY OVERFLOW BASIN - 30,000 90,000 1,080,000 - - -
SEWER EASEMENT ACCESS PROGRAM - 400,000 - - - - -
SEWER LIFT STATION REPAIRS AND UPGRADES 1,360,380 100,000 100,000 100,000 100,000 100,000 1,000,000
SEWER LINE REFURBISHMENTS AND REPLACEMENT 3,397,895 330,000 330,000 330,000 330,000 330,000 3,300,000
SEWER PIPELINE CONDITION ASSESSMENT 393,000 80,000 80,000 80,000 - - -
SIMSBURY SEWER EXTENSION - - 161,000 - - - -
TAMARACK SEWER REHABILITATION AT RAILROAD RIGHT-OF-WAY 252,000 - - - - - -
TERRA MAR LIFT STATION REPLACEMENT 987,000 - - - - - -
TERRA MAR SEWER REPLACEMENT - EL ARBOL AND LOS ROBLES - - 180,000 1,070,000 - - -
VANCOUVER SEWER EXTENSION 1,006,000 - - - - - -
VISTA/CARLSBAD INTERCEPTER REACHES 1 & 2 REHABILITATION - - 20,000 121,000 - - -
TOTAL PROJECT EXPENDITURES 36,747,606 5,409,396 5,876,820 13,306,404 3,114,612 4,336,289 38,390,690
ENDING FUND BALANCE N/A 13,007,102 10,858,035 1,353,939 2,117,681 1,737,313 9,607,774
SEWER CONNECTION FEE FUND
SEWER REPLACEMENT FUND
CAPITAL IMPROVEMENT PROGRAM FUND SUMMARY
(1) Equal to projected fund balance less any continuing appropriations.K-9
PRIOR YEAR 1 YEAR 2 YEAR 3 YEAR 4 YEAR 5 YEAR 6-15
YEARS 2013-14 2014-15 2015-16 2016-17 2017-18 2019-28
BEGINNING FUND BALANCE (1)N/A 8,204,448 7,608,468 5,297,928 3,079,760 1,170,725 2,043,119
REVENUES
DEVELOPER FEES 1,585,020 646,460 612,832 887,965 1,308,394 23,812,521
TOTAL REVENUES N/A 1,585,020 646,460 612,832 887,965 1,308,394 23,812,521
CAPITAL PROJECTS
AVENIDA ENCINAS WIDENING - SOUTH OF PALOMAR AIRPORT ROAD 225,000 - 421,000 2,395,000 2,361,000 - -
CARLSBAD BLVD. REALIGNMENT / PALOMAR AIRPORT ROAD (SEGMENT 2) (20%)- - - - - - 804,400
CARLSBAD BLVD. REALIGNMENT / PALOMAR AIRPORT ROAD (SEGMENT 2) (RTCIP / 20%)- - - - - - 3,175,500
CARLSBAD BOULEVARD REALIGNMENT - CANNON TO MANZANO (SEGMENT 1)- - - - - - 6,047,100
CARLSBAD BOULEVARD WIDENING MOUNTAIN VIEW TO NORTHERLY CITY LIMITS (20%)- - - - - - 848,700
CARLSBAD BOULEVARD WIDENING MOUNTAIN VIEW TO NORTHERLY CITY LIMITS (RTCIP/20%)- - - - - - 1,099,000
CARLSBAD VILLAGE DRIVE - PONTIAC TO VICTORIA - - - - - - 2,675,900
EL CAMINO REAL AND CANNON ROAD INTERSECTION IMPROVEMENTS 65,000 524,000 - - - - -
EL CAMINO REAL AND CARLSBAD VILLAGE DRIVE DUAL LEFT TURNS - - - - - - 976,400
EL CAMINO REAL LEFT TURN LANE TO WESTBOUND TAMARACK - 286,000 - - - - -
EL CAMINO REAL RIGHT TURN LANE TO NORTH ALGA ROAD - - - - - - 378,000
EL CAMINO REAL WIDENING - ARENAL ROAD TO LA COSTA AVENUE - - 1,925,000 - - - -
EL CAMINO REAL WIDENING - ARENAL ROAD TO LA COSTA AVENUE (RTCIP)- 450,000 175,000 - - - -
EL CAMINO REAL WIDENING - TAMARACK TO CHESTNUT 7,656,022 485,000 - - - - -
EL CAMINO REAL WIDENING - TAMARACK TO CHESTNUT (RTCIP)422,000 - - - - - -
MELROSE DRIVE AND ALGA ROAD DUAL LEFT TURN LANES (RTCIP)- - - - - - 1,067,100
MELROSE DRIVE RIGHT TURN LANE TO WEST PALOMAR AIRPORT ROAD 561,000 - - - - - -
PALOMAR AIRPORT RD. AND COLLEGE BLVD. INTERSECTION IMPROV.495,500 - - - - - -
PALOMAR AIRPORT ROAD TURN LANE TO NORTH EL FUERTE STREET - - - - - - 1,033,100
PALOMAR AIRPORT ROAD TURN LANE TO SOUTH EL CAMINO REAL 591,000 - - - - - -
PALOMAR AIRPORT ROAD WIDENING AT PASEO DEL NORTE 1,676,019 - - - - - -
POINSETTIA LANE WIDENING - PASEO DEL NORTE TO BATIQUITOS (RTCIP)- - - - - - 896,100
SIDEWALK/STREET CONSTRUCTION - VALLEY AND MAGNOLIA SIDEWALKS 1,674,236 - - - - - -
SIDEWALK/STREET CONSTRUCTION - VARIOUS LOCATIONS 1,400,000 300,000 300,000 300,000 300,000 300,000 1,200,000
TIF TO CFD #1 - 40,000 40,000 40,000 40,000 40,000 2,357,039
TRAFFIC IMPACT FEE UPDATE 200,000 - - - - - -
TRAFFIC MONITORING PROGRAM 758,900 96,000 96,000 96,000 96,000 96,000 864,000
TOTAL PROJECT EXPENDITURES 15,724,677 2,181,000 2,957,000 2,831,000 2,797,000 436,000 23,422,339
ENDING FUND BALANCE N/A 7,608,468 5,297,928 3,079,760 1,170,725 2,043,119 2,433,301
TRAFFIC IMPACT FEES (TIF)
CAPITAL IMPROVEMENT PROGRAM FUND SUMMARY
(1) Equal to projected fund balance less any continuing appropriations.K-10
PRIOR YEAR 1 YEAR 2 YEAR 3 YEAR 4 YEAR 5 YEAR 6-15
YEARS 2013-14 2014-15 2015-16 2016-17 2017-18 2019-28
BEGINNING FUND BALANCE (1)N/A 70,556 70,556 70,556 70,556 70,556 70,556
REVENUES
TRANSNET REVENUE - - - - - -
TOTAL REVENUES N/A - - - - - -
CAPITAL PROJECTS
N/A - - - - - - -
TOTAL PROJECT EXPENDITURES - - - - - - -
ENDING FUND BALANCE N/A 70,556 70,556 70,556 70,556 70,556 70,556
PRIOR YEAR 1 YEAR 2 YEAR 3 YEAR 4 YEAR 5 YEAR 6-15
YEARS 2013-14 2014-15 2015-16 2016-17 2017-18 2019-28
BEGINNING FUND BALANCE (1)N/A 10,048,120 10,252,928 10,755,128 9,300,861 10,502,161 11,869,350
REVENUES
TRANSPORTATION TAXES 3,199,000 3,377,200 3,540,733 3,701,300 3,867,189 39,239,587
TOTAL REVENUES N/A 3,199,000 3,377,200 3,540,733 3,701,300 3,867,189 39,239,587
CAPITAL PROJECTS
ADA IMPROVEMENTS - 250,000 250,000 250,000 250,000 250,000 420,000
CARLSBAD BLVD BRIDGE CONCRETE BARRIER POWER PLANT (LOCAL MATCH)18,208 115,561 - - - - -
CARLSBAD BLVD BRIDGE CONCRETE BARRIER RAILROAD (LOCAL MATCH)28,245 98,631 - - - - -
CARLSBAD BLVD. REALIGNMENT 3,000,000 - - - - - -
EL CAMINO REAL WIDENING - CASSIA RD TO CAMINO VIDA ROBLE - - 325,000 2,495,000 - - -
EL CAMINO REAL WIDENING - TAMARACK TO CHESTNUT 3,925,885 - - - - - -
PAVEMENT MANAGEMENT PROGRAM 13,041,376 1,830,000 1,575,000 1,500,000 1,500,000 1,500,000 15,000,000
PAVEMENT MANAGEMENT PROGRAM (NON-JURIS FEES)3,607,474 700,000 725,000 750,000 750,000 750,000 7,500,000
TOTAL PROJECT EXPENDITURES 23,621,188 2,994,192 2,875,000 4,995,000 2,500,000 2,500,000 22,920,000
ENDING FUND BALANCE N/A 10,252,928 10,755,128 9,300,861 10,502,161 11,869,350 28,188,937
TRANSNET - BICYCLE
TRANSNET - LOCAL
CAPITAL IMPROVEMENT PROGRAM FUND SUMMARY
(1) Equal to projected fund balance less any continuing appropriations.K-11
PRIOR YEAR 1 YEAR 2 YEAR 3 YEAR 4 YEAR 5 YEAR 6-15
YEARS 2013-14 2014-15 2015-16 2016-17 2017-18 2019-28
BEGINNING FUND BALANCE (1)N/A 25,945 25,945 25,945 25,945 25,945 25,945
REVENUES
TRANSPORTATION TAXES - - - - - -
TOTAL REVENUES N/A - - - - - -
CAPITAL PROJECTS
EL CAMINO REAL WIDENING - TAMARACK TO CHESTNUT 345,000 - - - - - -
TOTAL PROJECT EXPENDITURES 345,000 - - - - - -
ENDING FUND BALANCE N/A 25,945 25,945 25,945 25,945 25,945 25,945
PRIOR YEAR 1 YEAR 2 YEAR 3 YEAR 4 YEAR 5 YEAR 6-15
YEARS 2013-14 2014-15 2015-16 2016-17 2017-18 2019-28
BEGINNING FUND BALANCE (1)N/A 672 672 672 672 672 672
REVENUES
TRANSNET REVENUE - - - - - -
TOTAL REVENUES N/A - - - - - -
CAPITAL PROJECTS
- - - - - - -
TOTAL PROJECT EXPENDITURES - - - - - - -
ENDING FUND BALANCE N/A 672 672 672 672 672 672
PRIOR YEAR 1 YEAR 2 YEAR 3 YEAR 4 YEAR 5 YEAR 6-15
YEARS 2013-14 2014-15 2015-16 2016-17 2017-18 2019-28
BEGINNING FUND BALANCE (1)N/A 24,402,733 24,701,975 22,098,969 21,982,282 22,544,469 23,444,385
REVENUES
DEVELOPER FEES 514,242 344,694 266,313 562,187 899,916 16,358,500
TOTAL REVENUES N/A 514,242 344,694 266,313 562,187 899,916 16,358,500
CAPITAL PROJECTS
COLLEGE BOULEVARD - CANNON TO BADGER LANE - - 1,090,000 - - - -
COLLEGE BOULEVARD PIPELINE "A" STREET TO CANNON ROAD 1,060,000 - - - - - -
DESALINATED SEAWATER TRANSMISSION MAIN - 45,000 45,000 383,000 - - -
MAERKLE PUMP STATION IMPROVEMENTS - 170,000 1,785,200 - - - -
POINSETTIA LANE - CASSIA ROAD TO SKIMMER COURT - - - - - - 741,600
RANCHO CARLSBAD GROUNDWATER SUPPLY - - - - - - 1,750,000
SAN LUIS REY MISSION BASIN GROUNDWATER SUPPLY - - 27,500 - - - 8,500,000
WATER MASTER PLAN UPDATE 700,000 - - - - - -
TOTAL PROJECT EXPENDITURES 1,760,000 215,000 2,947,700 383,000 - - 10,991,600
ENDING FUND BALANCE N/A 24,701,975 22,098,969 21,982,282 22,544,469 23,444,385 28,811,285
PRIOR YEAR 1 YEAR 2 YEAR 3 YEAR 4 YEAR 5 YEAR 6-15
YEARS 2013-14 2014-15 2015-16 2016-17 2017-18 2019-28
BEGINNING FUND BALANCE (1)N/A - 5,100,000 - - - -
REVENUES
RECYCLED WATER REVENUE 10,200,000 16,260,000 - - - -
TOTAL REVENUES N/A 10,200,000 16,260,000 - - - -
CAPITAL PROJECTS
RECYCLED WATER PHASE III - PIPELINES - 3,100,000 15,600,000 - - - -
RECYCLED WATER PHASE III - CWRF EXPANSION - 500,000 5,760,000 - - - -
RECYCLED WATER PHASE III - RESERVOIR - 1,500,000 - - - - -
TOTAL PROJECT EXPENDITURES - 5,100,000 21,360,000 - - - -
ENDING FUND BALANCE N/A 5,100,000 - - - - -
TRANSPORTATION DEVELOPMENT ACT (TDA)
WATER - RECYCLED WATER FUND
TRANSNET - STP
WATER - MAJOR FACILITY FEE FUND
CAPITAL IMPROVEMENT PROGRAM FUND SUMMARY
(1) Equal to projected fund balance less any continuing appropriations.K-12
PRIOR YEAR 1 YEAR 2 YEAR 3 YEAR 4 YEAR 5 YEAR 6-15
YEARS 2013-14 2014-15 2015-16 2016-17 2017-18 2019-28
BEGINNING FUND BALANCE (1)N/A 23,003,960 23,504,145 9,171,965 5,439,425 7,731,028 12,444,149
REVENUES
TRANSFER FROM OPERATING FUND, LOANS AND GRANTS 5,165,000 3,694,320 4,828,460 4,967,603 5,113,121 69,588,261
TOTAL REVENUES N/A 5,165,000 3,694,320 4,828,460 4,967,603 5,113,121 69,588,261
CAPITAL PROJECTS
ABANDON POTABLE SERVICES (NEW RECYCLED SERVICES)195,000 195,000 - - - - -
ASSET MANAGEMENT PLAN 164,365 - - - - - -
AVIARA PARKWAY AND PLUM TREE WATERLINE - - - 815,000 - - -
BUENA VISTA PUMP STATION AND FOREBAY REMOVAL - - 150,000 - - - -
CARLSBAD BOULEVARD - SOUTH OF AVENIDA ENCINAS - - - 280,000 670,000 - -
CARLSBAD WATER RECYCLING FACILITY (ENCINA PROJECTS)470,500 59,815 309,000 301,000 106,000 300,000 3,000,000
CATHODIC PROTECTION PROGRAM 1,246,700 - - - - - -
CRESTVIEW DRIVE TRANSMISSION MAIN - - - 240,000 - - -
CWRF - FLOW EQUALIZATION AND CHLORINE CONTACT TANK COVERS 265,000 500,000 - - - - -
DESALINATED SEAWATER TRANSMISSION MAIN - 100,000 80,000 847,000 - - -
E TANK DECOMMISSION (THE CROSSINGS ROAD)- 150,000 - - - - -
EL CAMINO REAL AND TAMARACK PUMP STATION REMOVAL - - - 80,000 - - -
EL CAMINO REAL RECYCLED WATER PIPELINE (LA COSTA RESORT)1,615,000 - - - - - -
EL FUERTE AND CORINTIA STREET PRESSURE REDUCING STATION 100,000 400,000 - - - - -
ELLERY PUMP STATION DECOMMISSION - 120,000 - - - - -
ELLERY WATER PUMP PROJECT 78,495 220,000 - - - - -
FIRE FLOW SYSTEM IMPROVEMENTS - - 720,000 720,000 - - 1,009,000
HYDROELECTRIC GENERATOR AT PALOMAR AIRPORT ROAD/WHITE SANDS - - 85,000 275,000 1,800,000 - -
HYDROELECTRIC RENEWABLE ENERGY GENERATOR-MAERKLE RES.2,000,000 - - - - - -
KELLY RANCH PRESSURE REDUCING STATION 560,000 - - - - - -
LA COSTA HI RESERVOIR INLET PIPELINE - - 250,000 1,900,000 - - -
LAKE CALAVERA RESERVOIR IMPROVEMENTS 6,396,911 - - - - - -
LIMITED ACCESS PIPELINE RELOCATION PROJECT 485,000 485,000 485,000 485,000 - - -
MAERKLE FACILITY IMPROVEMENTS 2,135,200 - - - - - -
MAERKLE FLOATING COVER REPLACEMENT 130,000 140,000 9,730,000 - - - -
MAERKLE TRANSMISSION MAIN 5,200,000 1,130,000 - - - - -
MAINTENANCE AND OPERATIONS CENTER 7,170,000 - - - - - -
MISCELLANEOUS PIPELINE REPLACEMENTS 1,433,000 - - - - - -
OCEANSIDE WATER INTERTIE UPGRADE - - 115,000 - - - -
PALOMAR BUISNESS PARK RECYCLED WATER PIPELINES 1,245,000 - - - - - -
PARK DRIVE WATER LINE AND SURFACE IMPROVEMENTS 1,092,000 - - - - - -
PRESSURE REDUCING STATION REPLACEMENT/REHABILITATION 1,102,000 - - - - - -
RANCHO CARLSBAD GROUNDWATER SUPPLY - - - - - - 1,750,000
RECYCLED WATER LINE - CWRF TO CHINQUAPIN 1,900,000 - - - - - -
RECYCLED WATER MASTER PLAN UPDATE 672,468 - - - - - -
RECYCLED WATER PHASE III - CWRF EXPANSION 640,000 - - - - - -
RECYCLED WATER PHASE III - PIPELINES 2,000,000 - - - - - -
RECYCLED WATER PHASE III - RESERVOIR 300,000 - - - - - -
RESERVOIR REPAIR AND MAINTENANCE PROGRAM 3,035,000 965,000 - 150,000 - - 1,850,000
ROBERTSON RANCH WATER TRANSMISSION MAIN 1,200,000 - - - - - -
SAN LUIS REY MISSION BASIN GROUNDWATER SUPPLY - - 27,500 - - - 8,500,000
SANTA FE II INLET PIPELINE - - 470,000 2,368,000 - - -
SANTA FE II RESERVOIR SITE DRAINAGE 645,000 - - - - - -
TRI-AGENCIES WATER TRANSMISSION PIPELINE REPLACEMENT 1,255,000 100,000 5,100,000 - - - -
WATER SYSTEM INTERTIE CONNECTION - - 405,000 - - - -
WATER VALVE REPLACEMENT PROGRAM 350,000 100,000 100,000 100,000 100,000 100,000 1,000,000
TOTAL PROJECT EXPENDITURES 45,081,639 4,664,815 18,026,500 8,561,000 2,676,000 400,000 17,109,000
ENDING FUND BALANCE N/A 23,504,145 9,171,965 5,439,425 7,731,028 12,444,149 64,923,410
WATER REPLACEMENT FUND
Appendices
Appendices