Loading...
HomeMy WebLinkAbout3184; Cannon Road West; Cannon Road Bridge over Macario Canyon; 1998-05-01r L C c G G C I C C C C C Supplemental Structural Check Calculations Cannon Road Bridge over Macario Canyon Prepared for O'Day Consultants May 1998 TYLININTERNATIONAL SUPPLEMENTAL STRUCTURAL CHECK CALCULATIONS Hi ii F to FOR CANNON ROAD BRIDGE OVER MACARIO CANYON PREPARED FOR O'DAY CONSULTANTS MAY 1998 SUPPLEMENTAL STRUCTURAL CHECK CALCULATIONS -m P m FOR . m m CANNON ROAD BRIDGE I OVER MACARIO CANYON ! Pit >M9DANIELENGINEERING Project Engineer lYl • DAN IELENC3INEERINC3 5030 CAWING DE LA SIESTA, SUITE 204, SAN DIEGO, CA 92108 (619) 692-1920 •>Date Sheet ............. of ................ m m . . i' 7 &£ . to m m m m m to -t miig P IH pi M9DANIELENGINEERING 5030 CAMINO DE LA SIESTA, SUITE 204, SAN DIEGO, CA 92108 (619) 692-1920 Project.... Engineer., Date Sheet I of "I • DAN H±LcNC3INEcRINC3 S030 CAWING DE LA SIESTA, SUITE 204, SAN DIEGO. CA 92108 (619) 692-1920 Project.... Engineer. Date Sheet of rr- >i- ! \ , a: ~^ • ~~7 ^^> j 1 Jl? M9DANIELENGINEERING Project Engineer.. "SlZ. 5030 CAMINO DE LA SIESTA, SUITE 204, SAN DIEGO. CA 92108 (619) 692-1920 Date .^/?.^?. «g Sheet... J of - as: :Nt?'e\ \/5>¥YWi m m mm mm «• 3 P m ! 3 H M BRIDGE DESIGN PRACTICE JANUARY, 1983 2-8 m m (2) For bent cap - 'face of support1 for flared section is defined in AASHTO Art. 1.5.23(F)(2). The combined depth of column and cap =1.5 cap depth. &nd Parabolic Flare x = 2.75 +2.75 = 4.66 m M m m mm m m Iwl • DAN lELtlMolNttrilNo 5030 CAMINO DE LA SIESTA, SUITE 204, SAN DIEGO. CA 92108 (619) 692-1920 Project .<£^.^.C^.!^\...J*^.: Date Engineer Sheet .....TT..... of 4-e & pf ^ =HI ft HI •I , i , : !'<»><•* ft loi° m m fa jl^f lO-b^'-E^) + ^(ZMO.&) *--L(j,t.tJ^ < "I • DAN I EL t N VJIIIM t tl HIN v35030 CAMINO DE LA SIESTA, SUITE 204, SAN DIEGO, CA 92108 (619) 692-1920 Project Engineer.. Date Sheet of P^ra m mm mm M9DANIELENGINEERING 5030 CAMINO DE LA SIESTA. SUITE 204, SAN DIEGO, CA 92108 (619) 692-1920 Project Engineer Date Sheet of to It »rv^\ 4 g>1 1 ( ~ T^ IX mm mm P P tt Ivl • D AN lELENGINEERING 5030 GAMING DE LA SIESTA. SUITE 204, SAN DIEGO, C A 92108 (619) 692-1920 Project ...... !??. ..... <. ..................................................................................... Date ..................................... Engineer .......... .6^. ............................................................................................................. Sheet ............. of ................ 4k) A j^ */ .r Project Engineer KOOCAMINODE LA SIESTA, SUITE 204, SAN DIEGO, CA 92103 (619)592-1920 Date Sheet ............. of ................ ^ & = rt- 4 v p m P tt s "7 pfe m m Cannon Road over Macario Canyon Bridge Depth DeckT Soffit T Cap Drop Below Soffit Drop Cap Width Drop Cap Length (off CL) Ave W of Cap: Uniform Cap Load: DL/gtrder Ext Girder: 1st Int. Girder: A ft 8 in 6 in 125 ft 6 ft 8,5 ft 31 .6 ft 3.86 kips/ft 240.8 kips 15.19 ft 6 ft Cap Width: Clr top Reinf: Top Reinf. Diam. Clr bot. Reinf: Bot Reinf. Diam: fc: Left EOD Left Wheel #1 Right Wheel #1 Left Wheel #2 75 ft 4 125 in 326 in 3625 in 163 in 4000 psi 19.875 16.125 10.125 4.125 # of Top bars Area per bar a # of Bott bars Area per bar Right EOD 19.875 Right Wheel #2 11.675 Left Wheel #2 5.675 Right Wheel #1 0 Inside Cantilever (P-Load Outside) Loc CL Open #1 Edge Open *1 First Int. Girder Edge of Drop Edge Open #2 CL Open #2 Edge Open #2 Dist off CL ft 4 4.79 8 8.6 11.21 12 12.79 Opening Height in ~W~ 19 0 0 19 19 19 Soffit to bott open in 4 4 4 4 4 Chord Depth Top in 19 19 0 0 19 19 19 Bon in 25 25 0 0 __ 10 10 Factored Moments BC K-fl 266.6 232.1 116.1 98.8 39.8 ie!9~ DL + ADL K-ft 3,657.8 3,277.3 1,731.4 1,586.9 958.4 768.2 577.9 K-Load K-ft 1,921.0 1,742.7 1.071.6 946.1 513.6 431.2 348.6 P-Load K-ft 3.932.7 3,391.0 3,090.3 1,900.1 1,677.7 911.1 764.7 618.2 Desk Mav M5pa,ino U.S- SB, 8.5'' 5.634,8, 4.31, '•" 24.00 *"1 24.00 '.=' Mnn 4 336.60 336.60 112.20 112.20 112.20 <t>Vs kips leg spacin 504.90 504.90 168.30 168.30 168.30 * 6 Stirrup 9 (inches) 673.20 673.20 22440 224.40 224.40 s (Bottom C 5 420.75 42075 140.25 140.25 140.25 hord only) leg spacin 631.13 631.13 210.38 210.38 210.38 | (inches) 841.50 641.50 260.50 280.50 28050 0.44 6 504.90 504.90 168.30 168.30 16830 in2 per bar leg spacin 757.35 757.35 252.45 252.45 252.45 g (inches) 1,009.80 1 00980 336.60 336.60 336.60 Right Outside Cantilever (P-Load Outside) Loc Edge of Open # CLOp«n#1 Edge Open #1 First Int. Girder Edge of Drop Face Open #2 Edge Open #2 Edge Open *2 Dist off CL ft 3i33 4.67 8 8.6 11.2 11.21 12.79 Opening Height in 16 16 16 0 0 0 19 19 Soffit to bott open in 4 4 4 4 4 Chord Depth Top in 22 22 22 0 0 0 19 19 Bott in 25 25 25 0 0 0 10 io Factored Moments BC K-ft 2987T 266.8 237.2 116.1 98.8 40.0 39.8 16.9 DL + ADL K-ft 3.98O4" 3.657.6 3.335.1 1.731.4 1.586.9 960.8 958.4 S77.9 H-Load K-ft 1,159.4 1.019.3 679.2 405.1 342.4 70.6 69.5 P-Load K-ft 2.055.9 1,559.0 716.3 607.1 125.1 123.3 Desi£ M K- 6'2' 24.00 Mi 24.00 8-6' 24,003,3; 2,9* i,4t ; - - ^ 24.00 7' 24.00 336.60 336.60 336.60 112*0 ^112,20 504.ee' 504.90 504.90 168.30 168.30 673.20 673.20 673.20 224.40 22440 420.75 420.75 420.75 140.25 140.25 631.13 631.13 631.13 210.38 210.38 841.50 841.50 841.50 280.50 280.50 504.90 504.90 504.90 168.30 168.30 757.35 757.35 757.35 252.45 252.45 1,009.80 1 009 80 1,009.80 336.60 336.60 Left OuUMe Cantilever IP-Load Outside) Loc Edge of Open* CLOpen«1 Edge Open »1 First Int. Girder Face Open #2 Edge of Open* CL Open *2 Edge of Open # Bott Ext Girder Dist off CL ft 2.92 4 5.08 8 10.91 10.92 12 13.08 14 Opening Height in P10 10 10 0 ~0 16 16 16 0 Soffit to bott open in 4 4 4 4 4 4 Chord Depth Top in 28 28 28 0 6 22 22 22 0 Bott in 25 0 0 10 10 10 0 Factored Moments BC K-fl 318.1 266.8 220.0 116.1 45\ 3 45.1 27.2 13.8 DL*ADL K-ft 4.177.S 3.657.8 3.137.6 1.731.4 1.030.6 1.028.2 7682 508.1 286.6 H-Loed K-ft 1.245.1 1.019.3 793.5 405.1 100.9 99.6 P-Load j K-ft 2.207.9 1.807.5 1.407.0 718.3 178.9 177.0 Desic Mi K- rojr^p 7'4i 24.00 «.<f-?iW3.3— — 1.65— 1.6: MiM '•°S~2700 6> 24.0036 33660 * 336.60 * 336.60 112.20ni»r 11*20 504.90 50410 504.90 f. 11 168.30 168.30 166.30 673.20 673.20 673.20 224.40 224.40 224.40 420.75 420.75 420.75 140.25 140.25 140.25 631.13 631.13 631.13 210.36 210.38 210.38 841.50 841.50 841.50 280.50 280.50 280.50 504.90 504.90 504.90 168.30 168.30 168.30 757.35 757.35 757.35 252.45 252.45 252.45 1.009.80 1,009.80 1,009.80 336.60 336.60 336.60 Drop Cap 14" Cap ShearR2.xls 5:17 PM 4/15/98 M9DANIELENGINEERING SOSOCAMNODE LA SIESTA, SU.TE204, SAN DIEGO, CA 92108 (619) 692-1920 Project.... Engineer. Date.. Sheet of "L~LT "1 « ' tl » t» : . < " *J * * ^ > *» •*> ' r^ \ m m P M9DANIELENGINEERING 5030 CAMINO DE LA SIESTA, SUITE 204, SAN DIEGO, CA 92108 (619) 692-1920 Engineer., Date Sheet of -P^4" m m 0 n" ur 10 mm Project: Cannon Road over Macario Cyn Date: 4/16/98 Engineer: Greg Butler Sheet:of BEARING PAD DESIGN Bridge Type (ps/rc): ps Span Length (ft): 232.69 Percent Contributing: 100% Contributing Length: 232.69 Temp Range: 30 (designed per Caltrans Memo to Designers Manual 7-1) Number of Girders: 5 Number of Bearing Pads: 5 # LL Lanes: 3 Impact Factor: 25.1% BDS3.16 LLL Reduction Factor: 90%m m Abutl LOADING (incl. Impact)MOVEMENT DL: ADL: LL (HS) LL (ALT) LL (P-truck) DL+ADL/pad: LL(HS)/pad: LL(alt)/pad: LL(HS+1.15P)/pad: LL(max)/pad: 274 87 75.5 136.3 72 32.6 0.0 37.1 37.1 Thermal Coef.: Temperature Movement: Concrete Shrinkage: P/S Shortening: TOTAL MOVEMENT: Min Bearing Pad Thickness: 6E-06 0.75 0 0.70 1.45 2.90 in in in in in •I mm Fabric Reinforced Pad Max compressive stress: WxL min: square root: Trial W: Trial L: Area: Thickness: 304.8 mm 304.8 mm 92903 76.2 mm Stress with Dead Load Only: Min Stress with Dead Load Only: Shape Factor: Min Shape Factor: Max Pad Thickness: Compressive Stress: Input Compressive Strain from Figure 4A: Max Compressive Strain: Initial Thickness: Final Thickness after Creep: Fs max allowable: 800 psi 136.7 sq in 11.69 in 12.00 in 12.00 in 144.00 3.00 in 501 psi 200 psi 6.00 5 4.00 759 psi 5.0% 7% 2.85 in 2.81 in OK OK OK OK OK OK to Pm Actual Design Shear Force: Use this size fabric reinf pad: 304.8 mm W x Abutl Bearings.xls 14.4 kips 11.8 kips OK 304.8 mm L x 76.2 mm thick 9:55 AM 4/16/98 m m Project: Cannon Road over Macario Cyn Date: 4/16/98 Engineer: Greg Butler BEARING PAD DESIGN Bridge Type (ps/rc): ps Span Length (ft): 221.81 Percent Contributing: 100% Contributing Length: 221.81 Temp Range: 30 Sheet:of (designed per Caltrans Memo to Designers Manual 7-1) Number of Girders: Number of Bearing Pads: # LL Lanes: Impact Factor: BDS3.16 LLL Reduction Factor: 5 5 3 25.1% 90% H AbutS LOADING (incl. Impact)MOVEMENT DL: ADL: LL (HS) LL (ALT) LL (P-truck) DL+ADL/pad: LL(HS)/pad: LL(alt)/pad: LL(HS+1.15P)/pad: LL(max)/pad: 274 86.7 75.5 136.2 72 32.6 0.0 37.1 37.1 Thermal Coef.: Temperature Movement: Concrete Shrinkage: PIS Shortening: TOTAL MOVEMENT: Min Bearing Pad Thickness: 6E-06 0.72 0 0.67 1.38 2.77 in in in in in mII Fabric Reinforced Pad Max compressive stress: 800 psi WxLmin: 136.6 sq in square root: 11.69 in Trial W: 304.8mm 12.00 in Trial L: 304.8 mm 12.00 in Area: 92903 144.00 Thickness: 76.2 mm 3.00 in Stress with Dead Load Only: 501 psi Min Stress with Dead Load Only: 200 psi Shape Factor: 6.00 Min Shape Factor: 5 Max Pad Thickness: 4.00 Compressive Stress: 759 psi Input Compressive Strain from Figure 4A: 5.0% Max Compressive Strain: 7% Initial Thickness: 2.85 in Final Thickness after Creep: 2.81 in Fs max allowable: 14.4 kips Actual Design Shear Force: 11.2 kips OK OK OK OK OK OK Use this size fabric reinf pad: 304.8 mm W x Abut 6 Bearings.xls OK 304.8 mm L x 76.2 mm thick 9:55 AM 4/16/98 M9DANIELENGINEERING I 5030 CAMINO DE LA SIESTA, SUITE 204, SAN DIEGO. CA 92108 (619) 692-1920 Project Engineer Date Sheet of ,v; p.»•• $^!t-x *Hf 4' V «€- N P m m m am m,m m m ••I » D/VN lELcNGINEERING 5030 GAMING DE LA SIESTA, SUITE 204, SAN DIEGO, CA 92108 (619) 692-1920 Project \U&&£&*?. Date Engineer ^t^. Sheet of m m 4- 14/z, "p**» 3S.-Z. vn • DAN lELtlNKjllNttHINo soao CAMINO DE LA SIESTA, SUITE 204, SAN DIEGO, CA 92108 (619> 692-1920 Project *£*$«&. Date Engineer £^1? Sheet of m V- eg. 4 «• , ut>tv • ' -;H '' mn m m M9DANIELENGINEERING 5030 CAMINO DE LA SIESTA, SUITE 204, SAN DIEGO, CA 92108 (619) 692-1920 ^ Project r/.e£r.r^??. Date Engineer <&£>. Sheet of If tf _ ^X^S^VY ms M P» M M9DANIELENGINEERING P Ik 5030 CAMINO DE LA SIESTA, SUITE 204. SAN DIEGO, CA 92108 (619) 692-1920 Project Engineer., Date Sheet of ir P * P H P * Engineer., ii.s; Date Sheet of ID' * ".- ,"- • 4 •- 'W••.^•••fiii* B^jg. \*c Project Engineer m9DANIELENGJlNEERING) 5030CAMINODE LA SIESTA, SUITE 204, SAN DIEGO, CA 92108 (619)692-1920 Date .1/3&. Sheet of ,) M9DANIELENGINEERING 5030 CAMINO DE LA SIESTA, SUITE 204, SAN DIEGO, CA 92108 (619) 692-1920 Project Engineer.. Date ... Sheet of, M9DANIELENGINEERING 5030 CAMINO DE LA SIESTA. SUITE 204, SAN DIEGO, CA 92108 (619) 692-1920 Project Engineer Sheet of mi ,1. • « M9DANIELENGINEERING 5030 CAMINO DE LA SIESTA, SUITE 204, SAN DIEGO, CA 92108 (619) 692-1920 Project.... Engineer., Date Sheet of. i., I s n t , i > I I B 47' C4/V5VOV ROAD 47' I I f» L a /'—5' ELECTRIC TRANSMISSION \t A'H' 8'15'15' /.75'-*J 7.25'7.25'-1.75' STEEL RECLAIMED WATER u ELECTRIC DISTRIBUTION 5' L X, ,, -2T 4 '- \#b' - ffi36 IE -ri- r I I I ft i CANNON ROAD ELECTRIC DISTRIBUTIONSTEEL RECLAIMED „ WATER /5* MACARIO CANYON BRIDGE SECTIO NO SCALE Lruay i_onsu ixants IU C 0 N. S U L T A'N T S TRANSMITTAL LETTER : JOB NO. 96-1011 TO: MC DANIELS ENGINEERING : DATE: 4/9/98 JOB NO.: 97-1032 5030 Camino de la Siesta, Suite 204 PROJECT: CMWD Cannon Road San Diego, CA 92108 RE:Macario and Agua Hedjonda Bridge ATTN: Greg Butler : PHONE: (619)692-1920/FAX(619)692-0634 i : VIA: FAX ENCLOSURE: As we discussed, CMWD is willing to reduce the size of the water, reclaimed water and sewer force mains through the iMacario Canyon Bridge, from 16 In to 14 inch. The outside diameter of the 14 inch 10 gage welded steel lines, with concrete mortar lining arid coating, is 16.75 inches (±1/8 inch), and the weight per lineal foot is 88 Ibs(empty)- CHUCK COLLINS cc: Keith Hansen, O'Day Randy Kiaahsen, CMWD 232O Camino Vida Roble Suite B Carlsbad. California 92009 760-931-7700 Fax: 760-931-8680 Civil Engineering Planning Processing Surveying E-maU:odayconsul@aol. com TOTflL P.01 Aiutmnr Boctwoll- Approach Stob- •Concrete Trrust Bxx*, see Tie Rod rJlr See Typical Concrete Pipe Support Spacing DetotT., ——— . . Caslng Pipe. Extort Pipe 5 feet airta beyond opproocn slab, end of wtnywatlor 20 foot bo/art abutment bactwall. wHctvttr- Is greater^ Casing Insulator spacing par annufoctirer'srecommendation orjF'IeeTTnaxJiajtn. wticttxer Is less. First otiflost Insulator stall be wftrtn lfootfrotn~~ent-cf-coslng.F1ilYcld between dirt stop and first casing Insulator with foam. -pipe UK Set Kate I •Soffit Access Opcrtn}.see (u- •Selsalc Expansion Assembly. See N<** Otoroncft to concrete slatt Opertnj stall be pipe oKmettf plus f.SeeNottB Hates to Uectontco! Designers A. Additional expansion esseaUles trey be required depending on ae total mxefnent rating. B. Tn> Bridge Designer stoJd proride additional clearance to cccofunodate transverse seismic Dirt Stop- 2x8 red*mJ. typical wlttt coenlnj cut to ft! plot UK.—• Opening stall te pipe bell diameter plus -Bridge Sofftt -Four */Otf Gofironlzed Hall at each plonk.Typ. reawood.Typ. DIRT STOP DETAIL Kr-rr auxlmjm rur Release Valve AsseaUyat Mgt> point In pipe line proflle- 2-r jf Uanfole See Typical Concrete Pipe Support Spacing Petalr r-or I ZOVk Ufttt ^—Opening stall be pipe bell dloaeter plus Z"j stall be pipe tell alometer , -Pipe Une •Bridge Soffit PIPF INSTALLATION AT BENT CAP OCSKM turorau* otsoi |" OCTU.S 1" R.A. Sort* ouutmcs |" ".'•.'•.''.-•'.;•; VJ>-..•^•.-•J:!' Vf.n Pipe UM stall to Installed pe stall be tlgtty dofipednearest tfit centertwo pipe supportMatter supports.!!*» brge. e .ctotp stoat* sttaaad with stee/wosttf ''plates to provide '/t charanx between of pipe One at txfti ends.For ecftiruatton Stan be pipe diameterUortar In tower tatf of pipe opening PIPE STATE OF CALIFORNIA^ OEPAtmCNT OF TRAKSPORTATIOH --?•' '~-' T ~ Srtrf/Veftr Boa wttfi 6~ enoedmtrtPipe Protection SHeH.tolf circle. Pipe Hanger Casing Insulator- 2x2x12 yoye *//•• Fatfi \ •.'- •*. «'»' «t ••» •*. <fi'\ «.*«•*. FOR NEW BRIDGE t «• •-. ••.'-. '.v. i' -t 'i^->-. ;•; 4*,.{iv»'..'. V-1: •V-V-V'V-V-V'V-V-V'V-V'V.V.V-V-V^-V-ViV'V-V*- OrBfort Install Concrete ExpansionffOor at tattoo of dect. Total 4 ptr pkt*Expansion Aactor size par nonStxrunrsrtooaaenoWon for tt» load Intenkd FRONT VIEW SECTION VIEW CONCRETE PIPE SUPPORT . - Pipe st*at*ttyfycloa& a* ttetuoptpt nearest ffia center of ttm trMge, Matter pipe staff be sHamd wtm steel waster plate to pro*f4» >/4~ ctoararca txtween pipe and done. iaferrf restraint stall be Installed at me first and lost longer art odjocentto fte casing pipe Joint./°/-<vWe toot tros/a- at both sides Casing Pit Pipe Une Casing PfpfSize Thickness Soffit Access Opening Casing Insulator- FRONT VIEW FOR EXISTING BRIDGE PIPE HANGER ASSEMBLY QjCTHCAL-lCCHAICAL-MTfflCALIFORNIAAN) IASTEIATER DESK*25LWHEHT OF TRANSPORTATION