Loading...
HomeMy WebLinkAbout3190; Rancho Santa Fe Rd Alignment Correction Study; Rancho Santa Fe Rd Alignment Correction Study; 1988-03-01Hunsaker & Associates San Diego, Inc. Planning'Engineering • Surveying CITY OF CARLSBAD RANCHO SANTA FE ROAD ALIGNMENT CORRECTION STUDY MARCH 1988 Prepared By: Hunsaker and Associates San Diego, Inc. 6122 Nancy Ridge Drive Suite 101 San Diego, CA 92121 Tel: (619)535-2150 6122 Nancy Ridge Dr., Suiie 101 • San Diego, 6>1 92121 • (619) 535-2150 Offices: San Diego • Irvine • Ontario SlejjJjen Tale \Jack Hill • David Davis • Dave Hammar TABLE OF CONTENTS PAGE LOCATION MAP 1 INTRODUCTION 2 EXISTING CONDITIONS 2 RIGHT-OF-WAY REQUIREMENTS 2 PHOTOGRAPHS 3, 4 COST AND QUANTITY ESTIMATES 5, 6 EXHIBITS: A. PLAN VIEW "S" CURVE B. TYPICAL SECTION "S" CURVE C. VERTICAL PROFILE D. PLAN VIEW ACCELERATION LANE E. TYPICAL SECTION ACCELERATION LANE F. RIGHT-OF-WAY EXHIBIT SEE LOCATION MfiP PAGE 1 RANCH SANTA FE ROAD ALIGNMENT CORRECTION STUDY INTRODUCTION This study was initiated by the City of Carlsbad in response to a number of traffic accidents on Rancho Santa Fe Road between Cadencia Street and Questhaven Road. The objective of this study is to provide a proposal required to construct a safe alignment and improvement of Rancho Santa Fe Road per federal guidelines. EXISTING CONDITIONS 1- "S" Curve. The existing Rancho Santa Fe Road is a 32 feet wide road. Beginning from 540 feet north of Cadencia Street the alignment of road consists of reversing curves with radius of 1000 and 600 feet known as a "S" curve. Additionally, there are two vertical curves of 850 and 350 feet. The existing design speed of 37 miles per hour is a reduction to the speed limits preceding and following this stretch of road. RECOMMENDATIONS 1- "S" Curve. It is recommended that 1900 foot centeriine radius and 630 foot tangent to be utilize to replace existing "S" curve. A 600 foot vertical curve will produce a design speed of 55 miles per hour per Cultrans Highway Design Manual. An inlet and culvert shall be constructed to adequately drain the water from the low point since storm water sheets across the street under existing conditions. (See Exhibit A, B and C). 2- Acceleration lane and left turn lane at Cadencia Street: It is recommended that a 150 foot acceleration lane, 12 feet wide be constructed from Cadencia Street to northbound traffic of Rancho Santa Fe Road. Additionally, a 200 foot left turn lane into Cadencia Street will provide safer traffic movements on this intersection. (See Exhibit D and E.) RIGHT-OF-WAY REQUIREMENT To provide for this improvement it is necessary to acquire 0.921 acres of land from A.P.N. 223-05-59 and A.P.N, 223-05-54. (See Exhibit F). PAGE 2 TWO VIEWS SHOW "S" CURVE AND SIGHT DISTANCE PROBLEM LOOKING SOUTH ALONG RANCHO SANTA FE ROAD. PAGE 3 I Hi CADE;NCIA STREET INTERSECTION VIEW SHOWING SIGHT DISTANCE PROBLEM ALONG RANCHO SANTA FE ROAD (LOOKING NORTH) EXISTING DRAINAGE OUTLET PAGE 4 COST AND QUANTITY ESTIMATE Subject: Rancho Santa Fe Road Projects: Acc. Lane at Cadencia Date: 3-17-88 Job No: 561-1 NO ITEM QUANTITY UNIT PRICE COST 1. Clear & Grubbing L.S. 2. Remove C&G 1,520 3. C&G Const. 1,520 4. A.C. Pavem't. 11,320 sf 5. Earthwork 1,000 cy 6. Striping & Markings L.S. 7. Traffic Controlling L.S. 1.50 8.00 1.50 5.0 1,000, 2,280. 12,160, 16,980, 5,000, 2,000. 3,000. Sub Total 42,420. 10% + Conting. 4,240. TOTAL EST. COST 46,660, PAGE 5 COST AND QUANTITY ESTIMATE Subject: Rancho Santa Fe Road Projects: Correction of "S" curve 500 N. of Cadencia Street Date: 3-17-88 Job No.; 561-1 NO. ITEM QUANTITY UNIT PRICE COST 1. Clear & Grubbing 2. Const. A.C. berm 3. A.C. pavm't (incl. base) 4. Earthwork 5. Striping & Marking 6. Detour & Traffic 7. R/W Acquisition L.S. 1,900 35,560 2,200 L.S. 4.00 1. 50 5. 00 N.C. 3,000, 7,600, 53,340, 11,000, 2,000, 15,000, Sub Total 10% Conting. 91,940. 9,190, TOTAL EST. COSTS 101,13 0, PAGE 6