Loading...
HomeMy WebLinkAbout3338; Agua Hedionda & Calavera Creek Dredging; Flood Control; 1996-09-14Howard H. Chang Consultants Hydraulic, Hydrologic and Sedimentation Engineering P.O. Box 9492 Rancho Santa Fe, CA 92067 (619)756-9050. 594-6380. FAX: (619)756-9460 September 14, 1996 Mr. Lee Anderson Ms. Sue Loftin Mr. Steve Weed Rancho Carlsbad Mobile Home Park Carlsbad, California Dear Friends: Subject: Flood Discharges of Agua Hedionda Creek under Present Conditions Pursuant to your request, I have made a hydrology study for Agua Hedionda Creek (including Calavera Lake Creek as a tributary) in order to determine the 100-yr flood discharges under present conditions of development in the drainage basins. This study may be considered as an extension of the previous study entitled “Hydrological Study for Northeastern Carlsbad” that I made in July, 1989. In the previous study, the 100-yr flood discharges were determined based on the ultimate development of the drainage basin according to the master plan for future development. The study for the present conditions employs the original delineation of subbasins for Agua Hedionda Creek and Calavera Lake Creek. The drainage basins of Agua Hedionda Creek and Calavera Lake Creek were divided into 32 subbasins in the previous study. These subbasins are in different stages of development. Those with more than 50 % of the land area already developed include the following: A3. A6. A7, B, L1, L2, and UF. For other subbasins, the extent of development is less than 50 %. Surface water runoff is directly affected by development. Pavements and drainage facilities associated with a development generally result in increased runoff. In the Soil Conservation Service, or SCS, method for hydrology, surface water runoff is represented by the Curve Number, or CN. Values of CN are specified in the Hydrology Manual published by the County of San Diego. The selection of a CN value depends on the land use, land treatment or practice, soil type, hydrologic condition, and antecedent moisture condition of the area. Summaries of the CN values selected are given in Tables 1 an 2 for the two drainage basins, respectively. Subbasin Area, sq. miles A1 0.74 11 A2 I 0.21 I 90 I 82 II CN ultimate CN present 90 a2 A3 A4 II A5 I 0.20 I a7 I 80 II 0.48 a9 a5 0.68 90 82 A6 A7 II A8 I 0.29 I 88 I 79 II 0.50 a7 83 0.20 aa a4 L II A9 I 0.31 I 90 I All A12 L1 II A10 I 0.36 I 87 I 79 ~ 0.23 86 77 0.34 87 78 0.49 86 a3 L3 I1 L2 I 0.48 I 86 I a3 II 0.39 86 76 Subbasin Area, sq. miles CN ultimate CN present ~~-~ UA 6.50 91 a3 uc 1.65 89 ao UB 3.00 91 83 Table 2. Summary of CN numbers for Agua Hedionda Creek Basin II UD I 0.42 I 89 I 78 II 0.24 I a8 I 79 II 1.11 I 89 I 84 II 2 - Subbasin Area, sq. miles CN ultimate CN present H 0.28 88 78 G 0.51 87 77 F 0.96 91 81 E 0.58 86 76 D 0.34 86 75 II c I 0.30 I 90 I 79 A II €3 I 0.25 I 87 I 83 0.28 86 76 II A13 I 0.17 I 87 I 78 Point of concentration Calavera Lake Creek at entrance of mobile home park Agua Hedionda Creek at 300' upstream of mobile home park Agua Hedionda Creek just upstream of conthence with Calavera Lake Creek II ,414 I 0.43 I 87 I 79 Drainage area Discharge for Discharge sq. miles ultimate for present conditions conditions cfs cfs 5.90 1,739 896 16.47 7,809 6,148 17.30 8,080 6,334 The HEC-1 computer program developed by the U. S. Army Corps of Engineers that applies the SCS method for hydrology was employed in the previous study as well as this study. It was determined in the previous study that the 24-hr storm produces higher flood discharges at the mobile home park than does the 6-hr storm. Results of the hydrology study based on the 24-hr storm were obtained. Input/output listings of the HEC-1 run are attached to this letter. A summary of the computed 100-yr peak discharges at the selected points of concentration is given below. 3 Point of concentration Drainage area Discharge for Discharge sq. miles ultimate for present conditions conditions cfs cfs -~- The present 100-yr discharges for Agua Hedionda Creek through the mobile home park as shown in the above table are slightly lower than the corresponding ultimate 50-yr discharges. It was determined as described in the study “Flooding Issues Related to Agua Hedionda Creek for Rancho Carlsbad Mobile Home Park” by me dated May, 1996 that the channel has the capacity for the ultimate 50-yr flood. For this reason, this channel reach of Agua Hedionda Creek has the capacity for the present 100-yr flood. Agua Hedionda Creek just downstream of confluence with Calavera Lake Creek Agua Hedionda Creek just downstream 23.80 24.09 Comparison with the Corps Study for the San Diego River 9,848 7,256 9,910 7,311 The computed changes in flood discharge in relation to development are compared with other available data. Hydrology studies are normally made for the ultimate development in order to provide a higher design standard for drainage facilities to meet permanent needs. Among the hydrology studies for the San Diego area, the most comprehensive of all is perhaps the one made the by the U. S. Army Corps of Engineers in 1975 for the San Diego River basin (Corps of Engineers, Los Angeles District, “Hydrology: San Diego River”, July, 1975). This Corps study produced the discharge-frequency values for the present conditions (for 1975) as well as the ultimate conditions (for 2075) of the drainage basin. Those for the present conditions are tabulated below. of El Camino Real Bridge Discharge Frequency Values - Present Conditions I Point of concentration 100-vr discharge 50-vr discharpe San Vicente Confluence 32,000 14,000 Carlton Hills Blvd. 34,000 15,000 Sycamore Canyon 36,000 17,000 Santee Stream Gage 36,000 17,000 Murphy Canyon Road 36,000 ’ 17,000 River Mouth 36,000 17,000 4 The San Diego River basin is still undergoing transformation toward greater urbanization, which will also change the runoff hydrology. Urbanization will increase the peak runoff discharge as well as the volume of runoff by increased pavement, and shorter travel time due to drainage facilities. For the ultimate development of the drainage basin, the Corps has also obtained the discharge-frequency values, as listed in the table below. Currently, the design of flood control structures along the river are based on the ultimate 100-yr discharge. Discharge Frequency Values - Ultimate Conditions Point of concentration 100-vr discharee 50-vr discharge San Vicente Confluence 42,000 22,000 Carlton Hills Blvd. 46,000 25,000 Sycamore Canyon 49,000 27,000 Santee Stream Gage 49,000 27,000 Murphy Canyon Road 49,000 27,000 River Mouth 49,000 27,000 It may be interesting to compare the changes in flood discharge due to development for these basins. The 100-yr flood discharge of Calavera Lake Creek at the entrance to the mobile home park is affected the most by future development. This is explained by the fact that the flood discharge at this point is regulated by Calavera Lake. Other than this, flood discharges for the San Diego River are more affected by development than those for Agua Hedionda Creek including Calavera Lake Creek as a tributary. The drainage basin for the San Diego River was more developed in 1975 than the Agua Hedionda Creek basin today. The higher percentage increases in flood discharges for the San Diego River due to ultimate development are in part related to the higher development density. Please feel free to call me if you have any questions regarding this matter. Howard H. Chang Ph.D., P.E. Attachment: Input/output listings of HEC-1 run for present conditions 5 INPUT/OUTPUT LISTINGS OF HEC- 1 FOR EXISTING (PRESENT) CONDITIONS ~~*"**,*~*~*~*~"'***~****'*~~ * * FLOOD HYOROGRAPH PACKAGE (HEC-1) * FEBRUARY 1981 * * REVISED 02 AUG 88 * t RUN DATE 09/14/1996 TIME 15:31:30 * * * I *** tllllll*********.****~*~*.~*...*..**.** t U.S. ARMY CORPS OF ENGINEERS * * THE HYDROLOGIC ENGINEERING CENTER * 609 SECOND STREET . * II ttttttt***tttt..t."..~~~~=**~==~..ttt*l-t. DAVIS, CALIFORNIA 95616 . (916) 551-1748 t x x xxxxxxx xxxxx X x xx xx xx x xx X X xxxxxxx xxxx x xxxxx x x xx X X x xx xx X x x xxxxxxx xxxxx xxx THIS PROGRAM REPLACES ALL PREVIOUS VERSIONS OF HEC-1 KNWN AS HECl (JAN 73). HEClGS, HEClDB, AND HEClKU. THE OEFlNlTlONS OF VARIABLES -RTIMP- AN0 -RTIOR- HAVE CHANGED FRffl THOSE USED UITH THE 1973-STYLE INPUT STRUCTURE. THE DEFINITION OF -APISKK- ON RM-CARD WAS CHANGE0 UITH REVISIONS DATED 28 SEP 81. THIS IS THE FORTRAN77 VERSION NEY OPTIONS: DAMEREAK WTFLOU SUBMERGENCE , SINGLE EVENT DAMAGE CALCULATION, 0SS:YRITE STAGE FREQUENCY, 0SS:READ TIME SERIES AT DESIRED CALCULATION INTERVAL LOSS RATE:GREEN AN0 AMPT INFILTRATION KINEMATIC UAVE: NEU FINITE DIFFERENCE ALGORITHM HEC-1 INPUT PAGE 1 LINE IO.. . . . . .l.. . . . . .2.. . . . . .3.. . . . . .4.. . . .. .5.. . . . . .6.. . . . . .7.. . .... 8.. . . . . .9.. . . . .10 1 6 IO DRAINAGE STUDY FOR NE QUADRANT OF CARLSEAD ID FOR EXISTING CONDITIONS OF YATERSHEO DEVELOPMENT ID 24-HOUR STORM, 100-YEAR EVENT ID ZONES 7, 14 AND 15 IT 5 lMAY96 1200 300 10 5 7 KK CL A1 8 KM RUNOFF FRffl CALAVERA LAKE BASIN A1 9 IN 30 10 PB 5.10 11 PI 0 ,009 .007 ,009 .009 .011 .009 .011 ,012 .013 12 PI ,014 .016 .017 .02 .023 .03 .045 .067 ,088 .096 13 PI .082 .041 ,027 .023 .021 .02 ,019 .017 ,016 .018 14 PI .01 .016 .015 .014 .015 .012 ,013 .01 .01 .009 15 PI .01 .011 .01 .009 ,009 .009 ,009 .01 ,009 16 EA 0.74 17 LS 82 18 UD 0.45 19 KK CL A2 20 KM RUNOFF FRDn CALAVERA LAKE BASIN A2 21 BA 0.21 22 LS 82 23 UO 0.23 24 KK PT. 1 25 KM CWBINE FLWS OF A1 AN0 A2 26 HC 2 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 1 LINE 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 M 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 KK Kn RS RC RX RY KK KM PB BA LS UO CL A3 CHANNEL RWTING THRWGH CALAVERA LAKE BASIN A3 1 STOR -1 0.022 0,022 0.022 4200 0.012 465 475 485 495 505 515 525 535 355 350 345 340 340 345 350 355 CL A3 5.0 0.48 0.25 RUNOFF FROM CALAVERA LAKE BASIN A3 85 KK PT. 2 KM CWBINE FLW OF A3 YITH RWTEO FLW HC 2 KK CL A4 Kn RUNOFF FRDH CALAVERA LAKE BASIN A4 PB 5.10 BA 0.68 LS 82 UD 0.49 HEC-1 INPUT ID ....... 1 ....... 2 ....... 3 ....... 4 ....... 5 ....... 6 ....... 7 ....... 8 ....... 9 ...... 10 KK KM HC KK KM RS RC RX RY KK KM PB BA UD LS KK KM HC KK KM PB Bpi LS UD KK KM nc KK KM RS RC RX RY KK Kn PB BA PT. 2 2 CL A5 CWBINE FLWS OF BASINS A3 AND A4 CHANNEL RWTING THRWGH CALAVERA LAKE BASIN A5 1 STOR -1 0,022 0.022 0.022 3200 0.014 465 475 485 495 507 517 527 537 275 270 265 260 260 265 270 275 CL A5 4.9 0.20 0.19 CL A5 2 CL A6 4.9 0.50 0.25 PT. 3 2 CL A7 RUNOFF FRW CALAVERA LAKE BASIN A5 80 CWBINE FLW OF A5 WITH RWTED FLW RUNOFF FRW CALAVERA LAKE BASIN A6 83 CWBINE FLWS OF BASINS A5 AND A6 CHANNEL ROUTING THRWGH CALAVERA LAKE BASIN A7 1 STOP -1 . . 0.030 0.030 0.030 2700 0.010 450 465 480 495 515 530 545 560 245 240 235 230 230 235 240 245 CL n7 RUNOFF FRCU CALAVERA LAKE BASIN A7 6.9 0.20 PAGE 2 2 85 86 87 88 89 1 LINE 1 90 91 92 93 94 95 96 97 98 99 100 101 102 103 104 105 106 107 108 109 110 111 112 113 114 115 116 117 118 119 120 121 122 ~~ 123 124 125 126 127 128 129 130 131 132. 133 134 135 LINE 136 137 138 LS 84 UD 0.21 KK CL A7 KM CWBINE FLW OF A7 YITH RWTED FLW HC 2 HEC-1 INPUT PAGE 3 ID ....... 1.......2.......3.......4.......5.......6.......7.......8.......9......10 KK KM PB BA LS uo KK KM HC KK KM PB BA LS UD KK KM HC KK KM KO RS SE SA ss KK KM RS RC RX RY KK KM P8 BA LS UD KK m HC CL A8 4.9 0.29 0.26 PT. 4 2 RUNOFF FRW CALAVERA LAKE BASIN A8 79 CWBINE FLCWS OF BASINS A7 AND A8 CL A9 4.75 0.31 0.18 RUNOFF FRW CALAVERA LAKE BASIN A9 82 CL A9 L 75 RUNOFF FRW CALAVERA LAKE BASIN A9 0.31 0.18 82 CL A9 2 PT. 5 CWBINE FLCWS OF BASINS A7, AB, AN0 A9 STORAGE ROUTING IN CALAVERA LAKE 3 2 39.5 41 43 219 220 221 CL A10 CHANNEL RWTING THRWGH CALAVERA LAKE BASIN A10 1 STOR -1 0.035 01045 0.035 3600 0.027 450 465 480 495 515 530 165 160 155 150 150 155 CL A10 4.5 0.36 0.19 PT. 6 2 RUNOFF FRW CALAVERA LAKE BASIN A10 79 CWBINE FLCWS OF BASIN A10 UITH RWTED FLOU KK CL All m RUNOFF FRW CALAVERA LAKE BASIN All PB 4.75 BA 0.23 LS 77 UD 0.21 HEC-1 INPUT ID ....... 1 ....... 2 ....... 3 ....... 4 ....... 5 ....... 6.. KK PT. 6 m COMBINE FLOUS OF BASINS A10 AN0 All HC 2 ... 545 160 560 165 PAGE 4 .. 7.......8.......9......10 3 139 140 141 142 143 144 145 146 147 148 149 150 151 152 153 154 155 156 157 158 159 160 161 162 163 164 165 166 167 163 169 170 171 172 173 174 175 1 76 177 LINE 1 78 179 180 181 182 183 184 185 186 187 1.98 189 190 191 192 193 194 195 KK KM RK KK KM PB BA LS LID KK KM HC KK KM PB BA LS UD KK KM PB UD LS BA KK KM HC KK KM RS RC RX RY KK KM PB BA LS UD CL A12 CHANNEL ROUTING THROUGH CALAVERA LAKE BASIN A12 3100 0.007 0.035 20 3 CL A12 L.5 RUNOFF FRW CALAVERA LAKE BASIN A12 0.34 0.23 78 PT. 8 2 CL L1 4.9 0.49 0.35 CL L2 CWBINE FLWS OF BASIN A12 UITH ROUTED FLW RUNOFF FRW CALAVERA LAKE BASIN L1 83 RUNOFF FRW CALAVERA LAKE BASIN L2 4.9 0.48 83 0.27 PT. 7 2 CL L3 CWBINE FLOUS OF BASINS L1 AND L2 CHANNEL ROUTING THROUGH CALAVERA LAKE BASIN L3 1 STOR -1 0.030 OT040 0.030 4700 0.036 450 465 480 495 505 520 535 115 110 105 100 100 105 110 CL L3 4.75 RUNOFF FRW CALAVERA LAKE BASIN L3 IO... . . . .1.. . . . . .2.. . . . . .3.. . . . . .4.. . . . . .5.. . . . . .6.. . . . . .7. KK PT. 8 KM CWBINE FLWS OF BASIN L3 UlTH ROUTED FLW HC 2 KK PT. 8 Kw CIMBINE FLWS OF BASIN A12 UlTH ROUTED FLW FRW L3 HC 7 - KO 2 2 KK CL A12 KM CHANNEL ROUTING THROUGH CALAVERA LAKE BASIN A12 RS 1 STOR -1 RC 0.030 0.028 0.030 1200 0.007 RX 482 488 494 500 506 512 518 RV 52 48 44 40 40 44 48 KK CL A13 KM CHANNEL ROUTING THROUGH CALAVERA LAKE BASIN A13 RS 1 STOR -1 RC 0.030 0.028 0.030 2050 0.004 RX 482 488 494 500 506 512 518 ... 550 115 PAGE 5 ... B ....... 9 ...... 10 524 52 524 4 1 96 197 198 199 200 201 202 203 204 205 206 207 208 209 210 211 212 213 214 215 216 217 218 219 220 221 222 223 1 LINE 224 225 226 227 228 229 230 23 1 232 233 234 235 236 237 238 239 240 241 242 243 244 245 ~~ 246 247 248 249 250 251 252 RY 47 43 39 35 , 35 39 43 47 KK AQUAUA Ku RUNOFF FRW AQUA HEDIONDA BASIN UA PB 5.50 BA 6.50 LS 83 UD 1.02 KK AQUAUB Ku RUNOFF FROM AQUA HEDIONDA BASIN UB PB 5.4 KK PT 10 KM CWBINE FLOUS FRW AQUA BASINS UA AND UB HC 2 KK AQUAUF KM ROUTING THRWGH CHANNEL IN BASIN UF RS 1 STOR -1 RC 0.030 0.040 0.030 7300 0,0075 RX 800 905 965 1000 1020 1040 1100 1315 RY 350 325 320 318 319 320 325 350 KK AQUAUF KM RUNOFF FRW AQUA HEOIONDA BASIN UF PB 5.2 BA 1.11 LS a4 UD 0.46 HEC-1 INPUT IO ....... 1.......2.......3.......4.......5.......6.......7.......8..... KK AQUAUF KM COMBINE FLOUS FRW AQUA HEDIONDA BASIN UF AND RWTED FLOU HC 2 KK AQUAUE KM RUNOFF FRW AQUA HEDIONOA BASIN UE PB 5.0 BA 0.242 LS 79 UD 0.17 KK AQUAUG KM RUNOFF FROM AQUA HEDIONOA BASIN UG PB 5.1 BA 1.15 LS 80 UD 0.41 KK PT 11 KM HC 3 KK AQUA G KM RWTING THRWCH CHANNEL IN BASIN G COMBINE FLWS FRW BASINS UE, UF, AND UG RK 8200 0.022 0.033 0 0 20 3 KK AQUA G KM RUNOFF FROM AQUA HEDIONOA BASIN G PB 4.9 BA 0.51 LS 77 UO 0.38 KK PT 12 YII CCUBINE FLW FRW BASIN G UlTH RWTED FLW ..9 ..... PAGE 6 ,.lo 5 253 254 255 256 257 258 259 260 261 262 263 264 265 1 LINE I 266 267 268 269 -. . 2 70 271 272 273 274 275 276 277 278 279 280 281 282 ~~~ 283 284 285 286 287 288 289 290 291 292 293 2PL ... 295 296 297 298 299 300 301 302 303 304 305 LINE HC 2 KK AQUAUC KM RUNOFF FROM AQUA HEDIONDA BASIN UC P0 5.25 BA 1.65 LS 80 UD 0.60 KK AQUAUD KM RUNOFF FRW AQUA HEDIONDA BASIN UD PB 2.85 BA 0.42 LS 78 UD 0.22 HEC-1 INPUT ID... ... .1.. .... .2.. .... .3.. .... .4.. .... .5.. .... .6.. .... .7.. .... .8.. .... .9.. ... .10 KK PT 13 KM COnBlNE FLWS FROM UC AN0 UD HC 2 KK AQUA H KM RWTING THRWGH CHANNEL IN BASIN H RS 10 STDR -1 0 RK 2300 0.018 0.032 0 0 20 3 KK AQUA H KM RUNOFF FROM AQUA HEDIONDA BASIN H PB 4.9 0A 0.35 LS 78 UD 0.20 KK PT 14 KM COMBINE FLW FROM BASIN H WITH RWTED FLW HC 2 KK AQUA F KM RWTING THRWGH CHANNEL IN BASIN F RK 4200. 0.022 0.033 0 0 20 3 KK AQUA F KM RUNOFF FROM AQUA HEDIONDA BASIN F PB 4.9 BA 0.96 LS 81 UD 0.17 KK PT 12 KM COMBINE FLW FROM BASIN F WITH RWTED FLW HC 2 KK PT 12 KM COMBINE FLW FROM BASIN G YlTH RWTEO FLW HC 2 KK AQUA E KM ROUTING THROUGH CHANNEL IN BASIN E RK 4200 0.010 0.035 0 0 20 2 KK AQUA E KM RUNOFF FROM AQUA HEDIONDA BASIN E PB 4.75 BA 0.58 LS 76 M 0.23 HEC-1 INPUT ID ....... i ....... 2 ....... 3 ....... 4 ....... 5 ....... 6 ....... 7 ....... a ....... 9 ...... IO PAGE 7 PAGE 8 6 306 307 308 309 310 31 1 312 313 314 315 316 317 318 319 320 321 322 323 324 325 326 327 328 329 330 331 332 333 334 335 336 337 338 339 340 341 342 343 344 345 346 347 348 349 1 LINE 350 351 352 353 354 355 356 357 358 359 360 KK PT 15 Kl4 COMBINE FLW FROM BASIN E WITH RWTED FLW HC 2 YY AOIL n ..... . - KM RWTING THRWGH CHANNEL IN BASIN D RK 1800 0.010 0.035 0 0 25 2 KK AQUA D KM RUNOFF FROM AQUA HEDIONOA BASIN 0 BA 0.28 LS 75 UD 0.16 KK PT 16 KM COMBINE FLW FROM BASIN 0 WITH RWTEO FLW HC 2 KK AQUA C KM RUNOFF FROM AQUA HEDIONOA BASIN C BA 0.302 LS 79 UD 0.12 KK PT 17 KM HC 2 KK AQUA B KM RWTING THRWGH CHANNEL IN BASIN B RK 3800 0.007 0.030 25 1.5 KK AQUA B COMBINE FLW [RW BASIN C WITH RWTED FLW KM RUNOFF FROM AQUA HEDIONDA BASIN B PB 4.50 EA 0.25 LS 83 UO 0.24 KK PT 18 KM COMEINE FLW FRffl BASIN E WITH RWTED FLW KO 2 2 HC 2 KK PT 18 KM Cffl8lNE FLWS FRDn AQUA HEDIONDA CREEK AND CALAVERA CREEK HC 2 KK CL A13 KM RUNOFF FROM CALAVERA LAKE BASIN A13 PE 4.5 BA 0.17 LS 78 UO 0.15 HEC-1 INPUT ID. ..... .1.. .... .2.. .... .3.. .... .4.. .... .5.. .... .6.. .... .7.. .... .E.. .... KK PT 18 KM COMBINE FLWS OF BASIN A13 WITH RWTED FLCU HC 2 KK AQUA14 KM RUNOFF FROM BASIN A14 PB 4.5 8A 0.43 LS 79 uo 0.18 KK PT 18 m CDWEINE FLCUS OF BASIN A14 WITH RWTED FLW .9.. .. PAGE Q ..lo 7 363 KK AQUA A 364 KM RUNOFF FRW APUh HEDlONDA BASIN I 365 BA 0.283 366 LS 76 367 UD 0.10 368 KK PT 19 369 KM COMBINE FLWS OP BASINS A AND B 370 HC 2 371 22 * FLWO HYDROGRAPH PACKAGE (HEC-1) * FEBRUARY 1981 REVISE0 02 AUG 88 * * * RUN DATE 09/07/1996 TIME 15:31:30 * * .. t**r****.l.t*******t*tttl.....*t****t*t 6 10 IT DRAINAGE STUDY FOR NE QUADRANT OF CARLSBAD FOR EXISTING CONDITIONS OF UATERSHED DEVELOPMENT 24-HOUR STORM, 100-YEAR EVENT ZONES 7. 14 AN0 15 WTPUT CONTROL VARIABLES IPRNT 5 PRINT CONTROL IPLOT 0 PLOT CONTROL QSCAL 0. HYOROGRAPH PLOT SCALE HYDROGRAPH TIME DATA NMlN 5 MINUTES IN CCUPUTATIDN INTERVAL IOATE 1MAY96 STARTING DATE ITlME 1200 STARTING TIME NQ 300 NUMBER OF HYDROGRAPH ORDINATES NDDATE 2MAY96 ENDING DATE NDTIME 1255 ENDING TIME ICENT 19 CENTURY MARK CCUPUTATION INTERVAL .08 HOURS TOTAL TIME BASE 24.92 HOURS ENGLISH UNITS DRAINAGE AREA SQUARE MILES PRECIPITATION DEPTH INCHES LENGTH, ELEVATION FEET FLW CUBIC FEET PER SECOND STORAGE VOLUME ACRE-FEET SURFACE AREA ACRES TEMPERATURE OEGREES FAHRENHEIT .I.. t**tttttt.t.t-=.~.....~~~.~=..t.. t I U.S. ARUY CORPS OF ENGINEERS * THE HYDROLOGIC ENGINEERING CENTER * 609 SECOND STREET DAVIS, CALIFORNIA 95616 (916) 551-1748 * .. . * t * ..t.t.*ttttt....*~***.*---...*~~...~~..~ *tt t.. f.* .*. ttt **. *.. ttt .*. t.. *** ..* tt. t.. t.. ttt *** *." t.. t.. ... ttt tt. ... t.. *.. ... ttt *** *.. tt. .** **t ..,*++.****+.** 108 KK * PT. 5 * II " t ........ *..**. 110 KO OUTPUT CONTROL VARIABLES .... IPRNT 3 PRINT CONTROL IPLOT 2 PLOT CONTROL QSCAL 0. HYDROGRAPH PLOT SCALE HYDROGRAPH ROUTING DATA 8 111 RS 112 SA 113 SE 114 SS STORAGE RWTING NSTPS 1 NUMBER OF SUBREACHES ITIP ELEV TYPE OF INITIAL CONOITION RSVRlC 209.00 INITIAL CONOITION X .OO WORKING R AND D COEFFICIENT AREA 21 .o 24.0 27.0 30.0 33.0 35.0 38.0 39.5 41 .O 43.0 ELEVATION 208.00 210.00 212.00 214.00 216.00 217.00 218.00 219.00 220.00 221.00 SPILLWAY CREL 216.50 SPILLUAY CREST ELEVATION coau 2.64 UElR COEFFICIENT EXPW 1.50 EXPONENT OF HEAD SPUlD 150.00 SPILLUAY UlOTH **. CDHPUTEO STORAGE-ELEVATION DATA STORAGE .OO 44.97 95.94 152.91 215.89 249.88 286.37 325.12 365.37 407.36 ELEVATION 208.00 210.00 212.00 214.00 216.00 217.00 218.00 219.00 220.00 221.00 CDHPUTED WTFLOU-ELEVATION DATA WTFLOU . 00 .no .65 5.19 17.50 41.49 81.03 140.01 222.33 331.87 ELEVATION 208.00 216.50 216.51 216.56 216.63 216.72 216.85 217.00 217.18 217.39 WTFLOU 472.52 648.18 862.73 1120.06 1424.06 1778.62 2187.61 2654.95 3184.51 3780.19 ELEVATION 217.63 217.89 218.18 218.50 218.85 219.22 219.63, 220.06 220.51 221.00 COMPUTE0 STORAGE-00TFLOY-ELEVATION DATA STORAGE .OO 44.97 95.94 152.91 215.89 232.63 233.11 234.53 236.90 240.24 WTFLOU .OD . 00 .no .oo . 00 . 00 .65 5.19 17.50 41.49 ELEVATION 208.00 210.00 212.00 214.00 216.00 216.50 216.51 216.56 216.63 216.72 STORAGE 244.56 249.88 256.25 263.72 272.34 282.17 286.37 293.26 305.56 319.10 WTFLOU 81.03 140.01 222.33 331.87 472.52 648.18 727.50 862.73 1120.06 1424.06 ELEVATION 216.85 217.00 217.18 217.39 217.63 217.89 218.00 218.18 218.50 218.85 STORAGE 325.12 333.93 350.10 365.37 367.65 386.70 407.36 ~~~ ~~ ~ ~ ~~ WTFLOU 1565.33 1R8.c 2187.61 2592.97 2654.95 3184.51 3780.19 ELEVATION 219.00 219.22 219.63 220.00 220.06 220.51 221.00 111111 e.. ..* **e t.. HYDROGRAPH AT STATION PT. 5 PEAK FLOU TIME MAXIMUM AVERAGE FLOU 6-HR 24-HR 72-HR 24.92-HR + (CFS) (HR) + 604. 11.67 416. 182. 175. 175. (INCHES) 1.072 1 .E73 1 .an 1 .E73 (AC-FT) 206. 361. 361. 361. (CFS) PEAK STORAGE TIME + (AC-FT) (HR) 280. 11.67 MAXIIII*I AVERAGE STORAGE 6-HR 24-HR 72-HR 24.92-HR 269. 174. 168. 168. PEAK STAGE TIME MAXIMUM AVERAGE STAGE 6-HR 24-HR 72-HR 24.92-HR + (FEET) (HR) 217.82 11.67 217.52 214.31 214.11 210.11 CUMULATIVE AREA = 3.61 sa MI Q 1 STATIOY PT. 5 (1) INFLW, (0) WTFLOU 0. 200. 400. 600. 800. 1000. 1200. 1400. 1600. 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. 100. 200. 300. 0. 0. 0. (SI STORAGE OAHRMN PER 1,200 11 ............................................................. s. ......,-........ .....____ ___...... .._...... ......... 11235 81 .s 11240 91 .s 11245 101 .s 11250 111 .............................. S............................. 11255 121 .s 11300 131 .s 11305 141 .s 11310 151 .s 11315 161 .s 11320 171 .s 11325 181 .s 11330 191 .s 11335 201 .s 11345 221 .s 11350 231 .s 11355 241 .s 11400 251 .s 11405 261 .s 11410 271 .s 11415 281 .s 11420 291 .s 11425 301 .s 11435 321 .s 11440 331 .s 111.45 341 .s 11450 351 .s 11455 361 .s 11500 371 .s 11505 381 .s 11510 391 .s 11515 401 .s 11520 411 .............................. S...... ....................... 11525 421 .s 11530 431 .s 11535 441 .s 11540 451 .s 11545 461 .s 11340 211 .............................. S............................. 11430 311 .............................. S............................. 11550 471 11555 481 11600 491 11605 501 11610 511 . 11615 521 11620 531 11625 541 11630 551 11635 561 11640 571 11645 581 11650 591 .... 11655 601 11700 611 . . . . . . 11705 621 11710 631 11715 641 11720 651 11725 MI 11730 671 ... .... .s .s .s .s .s.... .s .s .s .s .s .s .s .s .s .s .s .s .s .s .s ............. s.......... ... ...... 11735 bsI .s ... ~~ ~~ ... 11740 6901 .s 11745 7001 .s 11750 7101.. ............................ S............................. 11755 7201 .s 10 11800 7301 .s 11805 7401 .s 11810 7501 .s 11815 760 I .s 11820 770 I .s 11825 780 I .s 11830 790 I .s 11835 800 I .s 11840 810.1 ............................. s..................... ....... 11845 820 I .s 11850 830 I .s 11855 840 I .s 11900 850 I .s 11905 860 I .s 11910 870 I .s 11915 880 I . .s 11920 890 I . .s 11925 900 I . .s 11935 920 I. .s 11940 930 1. .s 11945 940 I. .s 11950 950 I. .s 11955 960 I. .s. 12000 970 I .s. 12005 980 I .s. 12010 990 .I .s. 12015 1000 .I .s. 120201010 ...... I........................S............................ 12025 1020 .I. .s. 12030 1030 I. .s. 12035 1040 1. .s. 12040 1050 .I .s. 12045 1060 .I . 5. 12050 1070 I. . s. 12055 lOB0 1. . s. 12100 1090 .I s. 12105 1100 .I s. 121101110 .................. I...............S.......................... 12115 1120 .I 5. 12120 1130 .I. s. 12125 1140 1. s. 12130 1150 .I s 12135 1160 .I. .s 12140 1170 1. .s 12145 1180 .I .s 12150 1190 . I .s 12155 1200 I. s . 122001210 .................................. I..S....................... 12205 1220 .IS. 12210 1230 . IS. 12215 1240 . I s. 12220 1250 . I s. 12225 12M) .I s 12230 1270 .I .s 12235 1280 .I .s 12240 1290 .I .s 12245 130. 0 I. .s. 12250131 .... 0.. ......................... I...........S.................. 12255 132. .o 1. . 5. 12300 133. . 0. .I . s. 12305 134. 0 .I 5. 12310 135. .o I. 5. 12315 136. . 0. .I s. 12320 137. 0. I s. 12325 138. 0. I. 5. 12330 139. 01. s. 12335 140. 01 5. 12340141 ............... 01 ............................ S................ 12345 142. 10 s. 12350 143. IO s. 12355 144. 10 5. 20000 145. I 0. s. 11930 910 .. 1............................S............................. 11 20005 146. . I 0. s. 20010 147. . I 0. s. 20015 148. . I 0. s. 20020 149. .I 0. 5 20025 150. .I 0. 5 20030151. .......... 1.0 .............................. S 20035 152. .I 0 . 5 20040 153. .I 0 . 5 20045 154. .I 0 . s. 20050 155. IO . 5. ~~~~~ ~~~ ~~ 20055 156. IO . s. 20100 157. IO s. 20105 158. 10 5. 20110 159. IO s. 20115 160. 10 s. 20125 162. 1. 0 s. 20130 163. I .o 5. 20135 164. I .O s. 20140 165. I .o s. 20145 166. I .o s. 20150 167. 10 5. 20155 168. IO s. 20200 169. 10 s. 20120161. ......... 1.0 ................................ S............ ..... 20245 178. 20250 179. 20255 180. 20300 181. 20305 182. 20310 183. 20315 184. 20320 185. ... 10 .I .o. I 0. I 0. I 0. 10. IO. IO. . . . . . . . . .... s. s. s. s. s. s. s. ......... s............ 10. s. 10 . s. 10 . . s. ...... 10 ................................. s....... I. . s. I. . 5. 10 . . 5. . 10. . 5. -.. __ . . . . 20330 187. . 20335 188. .IO. 20340 189. .IO. 20345 190. .IO. . . . . . . . ~ ~~~ 20325 186. . IO. . s. 20330 187. . 10. . 5. 20335 188. .IO. . s. 20340 189. .IO. . s. 20345 190. .IO. . s. . s. . s. . s. 20350191 ....... 1.0 ................................... S............. .... 20355 192. . 10 . . s. 20400 193. . IO . . 6.' 20405 194. . 10 . . s. 20410 195. . 10 . . s. 20415 196. .I. . 5. 20420 197. .I. . 5. 20425 198. .I. . 5. 20430 199. .I. . 5. ~~ ~~ ~ ~ 20435 200. .I. . s. 20440201 ........ I...................................S................. 20445 202. .I. . 5. 20450 203. .I. . s. 20455 204. .I. 20500 205. .I. 20505 206. .I. 20510 207. .I. . s. 5. . s. . 5. 20520 209. .I. . s. 20525 210. .I. . s. 20530211.. ...... I... ................................ S................. 20535 212. .I. 20540 213. .I. . s. . s. 20545 216. . 10 . . s. . 10 . . 5. . IO . . s. 20600 217. . IO . . s. 20605 218. . 10 . . s. 12 20610 219. 20615 220. 20620 221. 20625 222. 20630 223. 20635 224. 20640 225. 20645 226. 20650 227. 20655 228. 20700 229. 20705 230. 20710 231. 20715 232. 20720 233, 20725 234. 20730 235. 20735 236. 20740 237. 20745 238. 20750 239. 20755 240. 20800 241. 20805 242. 20810 243. 20815 244. 20820 245. 20825 246. 20830 247. 20835 248. 20840 249. 20845 250. 20850 251. 20855 252. 20900 253. .... .... .... .... . 10 . IO . .IO . 10 . 10 . 10 . IO . 10 .IO . 10 . IO .I 0 .I .o. .I 0 .I 0 .IO .IO 10 10 10 IO 10 IO. . 10 IO IO 10 IO 10 10 IO I I.. 01 01 . s. . s. . s. . s. . s. . s. . s. . s. . 5. . s. . s. . s. . s. . 5. . s. . 5. . s. . 5. . s. . s. . 5. . s. . s. . 5. . 5. . s. . s. . s. . s. . s. . s. ................................... s ................. ................................... s ................. ................................... s ................. ................................... s ................. ................................................................................................... **..***.**.*** t * 181 KK PT. 8 . t*ttt..ttt.C*t 184 KO OUTPUT CONTROL VARIABLES IPRNT 2 PRINT CONTROL ]PLOT 2 PLOT CONTROL OSCAL 0. HYDROGRAPH PLOT SCALE 183 HC HYDROGRAPH CDnElNATlON I CWP 2 NUMEER OF HYDROGRAPHS TO CCUBINE ttt ................................................................................................................................... PEAK FLW TIME MAXIMUM AVERAGE FLW 6-HR 24-HR 72-HR 24.92-HR + (CFS) (HR) + 896, 11.67 703. 342. 329. 329. (INCHES) 1.108 2.156 2.156 2.156 (At-FT) 349. 678. 670. 678. (CFS) CUMULATIVE AREA = 5.90 SO MI 13 1 STATION PT. 8 (0) WTFLW 0. 100. 200. 300. 400. 500. 600. 700. 800. 900. 0. 0. 0. DAHRMN PER 11200 10 11350 230 11355 240 11400 250 11405 260 11410 270 11415 280 11420 290 11425 300 11430 310.. . . . . . . . . . . . . . . . . . . 11435 320 11440 330 11445 340 11450 350 11455 360 11500 370 11505 380 11510 390 11515 400 11545 460 11550 470 11555 11600 11605 11610 11615 11620 11625 11630 11635 11640 11645 11650 11655 11700 11705 11710 11715 11720 11725 11730 11735 11 740 11745 480 490 500 510 5 20 530 540 550 560 570 580 590 600 610 620 630 640 650 6M) 670 680 690 700 . . . . . . . . ... .. .. ......................... ......................... ..................... ..................... ~~ 11750 710 . . . . . . . . . . . . . . . . ............................................... 11755 72.0 11800 73.0 74.0 11810 75.0 11815 76.0 11820 n.0 11840 81.0 ........................................................... 11845 82. 0 11850 83. 0 11855 84. 0 11900 85. 0 11905 86. 0 11910 87. 0 11915 88. 0 . 11920 89. 0 . 14 11925 90. 11930 91. 11935 92. 11940 93. 11945 94. 11950 95. 11955 96. 12000 97. 12005 98. 12010 99. 12015 100. 12020 101. 12025 102. 12030 103. 12035 104. 12040 105. 12045 106. 12050 107. 12055 108. 12100 109. 12105 110. 12110 111. 12115 112. 12120 113. 12125 114. 12130 115. 12135 116. 12140 117. 12150 119. 12155 120. 12200 121. 12205 122. 12210 123. 12715 124. 12220 125. 12225 126. 12230 127. 12235 128. 12240 129. 12245 130. 12250 131. 12145 118. 0. .o. . . . 0. 0. 0. 0. 0. 0. 0 .a .o ..... ..... .. .. .. ............ ............ o........... .o . 0. .o . 0. .o .. ... ... ...... 0.. . . 0. 0. 0. .o 0 ... .. .. ... .... .. ........ I......... .................. 0 .. 0 .o ... ..... 0 .. ..... .. ..... .... 0 .. 0. .a .o ..... ............ .o. . . .o .o .o .o ..... .. 0 0 .o 0. ................ .o 0.. . . .. 12255 132. .o 12300 133. .o 12305 134. . 0. 12310 135. .o 12315 136. 12320 137. 0. .o 138. 139. 140. 141. 142. 143. 144. 20000 145. 1P6. ............................... ............................... 0. 0. 0. ........... 0 .o. .o . . 147. 148. 149. 150. 151. 0. ..... o...... 0. .o. .o . .o .o .o 0 0. 0. ............... 20035 200LO 152. 153. 154. 155. 156. 157. 158. 159. 160. 20120161. ................................. O.... ....................... 20125 162. . 0. 15 20130 163. 20135 164. 20140 165. 20145 166. 20150 167. 20155 168. 20200 169. 20205 170. 20210 171. 20215 172. 20250 179. 20255 180. 20300 181. 20305 182. 20310 183. 20315 184. 20320 185. 20325 186. 20330 187. 20335 188. 20340 189. 20345 190. 20350 191. 20355 192. 20400 193. 20405 194. 20410 195. 20415 196. 20420 197. ...................... ...................... .................... ... ... .o .o .o .o .o .o .o 0 . . . .o. . . . 0. 0. 0. 0. 0. 0. 0. 0. 0. . .o. . . . . . 0. 0. 0 0 0 0. 0. 0. 0. .o. . 0. 0. 0. 0. 0. 0. ...................... ...................... ...................... ..... LU’t33 LUU. V. 20440201. ....................... O..................................... 20445 202. 0. 20450 203. 0. 20455 204. . 0. 20500 205. . 0. .. 20505 206. . 0. 20510 207. . 0. 20515 208. . 0. 20520 209. . 0. 20525 210. . 0. 20530211 ....................... O..................................... 20535 212. 0. 20540 213. . 0. 20545 214. . 0. 20550 215. .o. 20555 216. .o. 20600 217. .o. 20605 218. .o . 20610 219. .o . 20615 220. .o 21250 299. 0. 21255 300. ...--.....---...~~..---.o-~...-.....--- _________ ___..____ _________ _________ _________ _....____,___..____,........., 1 tt. lll. *t* *** ttt tt. *,. t.. ... ttt ... tt. *.* ... **. ..* tt. e.. t.. t.. ... t.. *.. ttt .** *t. tt. *I* *.. **. **. *** .*. .. **.*...*..** . 1 337 KK PT 18 * . * ***......***** 16 339 KO WTPUT CONTROL VARIABLES IPRNT 2 PRINT CONTROL IPLOT 2 PLOT CONTROL QSCAL 0. HYDROGRAPH PLOT SCALE 340 HC HYDROGRAPH CCUEINATION I COUP 2 NUMEER OF HYDROGRAPHS TO CDMElNE *** ..................................................................................... PEAK FLOU TIME + (CFS) (HR) MAXIMUM AVERAGE FLOU 6-HR 24-HR 72-HR 24.92-HR (CFS) + 6334. 10.75 3609. 1460. 1406. 1406. (INCHES) 1.939 3.137 3,137 3.137 (AC-FT) 1790. 2895. 2895. 2895. CUMULATIVE AREA = 17.30 SQ MI 1 STATION PT 18 11945 0. 1000. 10-.......-,-. PER 91.0.. . . 92. 0 93. 0 94. 0 11950 95. 11955 96. 12025 102. (0) WTFLW 2000. 3000. ... _... 4000. ... .. 5000. ... 0. 0. 0. 0. 0. 0. 0. .. o...................... 6000. 7000. ......... . .......... 0. 0. ..__...._ ....... ............. 0. 0. 0. ......... ......... ............ ............................... 12030 103. 0. 12035 104. 0. 12040 105. 0 12045 106. .o 12050 107. .o 12055 108. .o . 12100 12105 12110 12115 12120 12125 12130 12135 12140 12145 12150 12155 12200 12205 12210 109. .o 110. 0 .... .. ................ 115. 0. 116. .o 121 ....................... o............. 122. 0. 123. .o .. ........... 12215 124. .o . 12240 129. .o 12245 130. .o 12250131 ................................ O..... ........................ 12255 132. .o 12300 133. .o 12305 134. .o 12310 135. 0 17 12315 136. 12320 137. 12325 138. 12330 139. 12335 140. '12340 141. 12345 142. 12350 143. 12355 144. 20000 145. 20005 146. 20010 147. 20015 148. 20020 149. 20025 150. 20030 151. 20035 152. 20040 153. 20045 154. 20050 155. 20055 156. 20100 157. 20105 158. 20110 159. 20115 160. 20120 161. 20125 162. 20130 163. 20135 164. 20140 165. 20145 166. 20150 167. 20155 168. 20200 169, 20205 170. 20210 171. 20215 172. 20220 173. 20225 174. 0. 0. . 0. .o . .o ........................ 0 ............................ 0. . 0. .o . .o .o 0. 0. . 0. .o . .o .o 0 0. 0. 0. . 0. .o. .o. .o .o .o .o .o .o .o .o 0 0 0. 0. ................ 0 ..................................... ........... 0 ........................................ ......... 0 .......................................... ...... ...... ...... 20230 175. 0. ~ ~~~ ~~ ~~ 20235 176. 0. 20240 177. 0. 21245 298. 0. 0. 21250 299. 21255 300 ......... 0 ............................................................................................................. 1 ................................................................................................... tttttt**.ttttt t 359 KK * PT 18 * " t ***.**.*.****. 361 KO WTPUT CONTROL VARIABLES IPRNT 2 PRINT CONTROL IPLOT 2 PLOT CONTROL PSCAL 0. HYDROGRAPH PLOT SCALE 362 HC HYDROGRAPH COMBINATION I CCnP 2 NUMBER OF HYDROGRAPHS TO CCnBlYE PEAK FLW TlUE + (CFS) (nu) MAXIMUM AVERAGE FLOU 6-HR 24-HR 72-HR 24.92-HR 18 (CFS) + 7256. 10.67 4395. 1838. 1771. 1771. (INCHES) 1.717 2.872 2.872 2.872 (AC-FT) 2179. 3646. 3646. 3646. 1 CUMULATIVE AREA = 23.80 SO MI STATION PT 18 (0) WTFLOW 0. 1000. 2000. 3000. 4000. 5000. 6000. 7000. 8000. OAHRMN PER 11930 11935 11940 11945 11950 11955 12000 12005 12010 91. .O. . . . 92. 0 93. 0 . 94. 0 . 95. 0 . 96. 0 . 97. 0 . 98. 0 . 99. 0. 12015 100. 0. .. 0. .. 0. 0. 0. ... ...................... 12035 10 12040 105, .o 12045 106. .o 12050 12200 12205 12210 12215 12220 12225 12230 12235 12240 12245 12250 12255 12300 12305 12310 107. . 0. 108. 0. 109. 0 110. .o 111. ........... o.......,........................................ 112. . 0. 113. 0. 115. .o. . 116. 0. 117. .o 118. .o. 119. 0. 120. .o 121 ............................ o..................,............. 122. 0. 123. .o 124. .o . 125. . 0. 12b. 0. 127. 0 128. .o 129. .o 130. .o 131 .................................... O........................ 132. .o 133. 0 134. 0. 135. 0. 136. 0. 137. . 0. 138. .o. 139. .o 140. .o 141 .............................. o.............................. 142. 0. 12125 114. .o 19 12350 143. . .o . 12355 144. .o . 20000 145. 20005 146. 20010 147. 20015 148. .o 0 0. . 0. 20020 149. .o. 20025 150. .o 20030151 ..................... O....................... ............... 20035 152. 0 20040 153. 0. 20045 154. 0. 20050 155. . 0. 20055 156. .o. 20100 157. .o . 20105 158. .o . 20110 159. .o 20115 160. .o 20120161 ................ O.................................. ........... 20125 162. .o 20130 163. 0 20135 164. 0 20140 165. 0. 20145 166. 0. 20150 167. 0. 20155 165. 0. 20200 169. 0. 20205 170. 0. 20210171 ............. O............................................... 20215 172. . 0. 20220 173. . 0. 20225 174. .o. 20230 175. .o. 20235 176. .o. 20240 177. .o . 21250 299. .o 21255 300, .....-....-o--....-,.-.-......-.........-.-.-.-.- _._...... ............................................................ 1 3 RUNOFF SUMMARY FLOU IN CUBIC FEET PER SECOND TIME IN HWRS, AREA IN SQUARE MILES PEAK TIME OF AVERAGE FLOU FOR MAXIMUM PERlW BASIN MAXIMUM TIME OF OPERAT ION STATION FLOU PEAK AREA STAGE MAX STAGE + 6-HCUR 24-HWR 72-HOUR + + + + + + HYDROGRAPH AT CL A1 HYDROGRAPH AT CL A2 2 COMBINED AT PT. 1 RWTED TO CL A3 HYDROGRAPH AT CL A3 2 CfflBlNED AT PT. 2 HYDROGRAPH AT CL A4 2 CfflBlNED AT PT. 2 313. 10.42 93. 10.08 402. 10.33 402. 10.42 226. 10.08 618. 10.25 286. 10.50 901. 10.33 153. 44 * 197. 197. 106. 303. 141. 443. 63. 18. 81. 80. 43. 124. 58. 181. 60. 17. 78. 77. 42. 119. 55. 174. .74 .21 .95 .P5 342.47 10.42 .48 1.43 .68 2.11 RWTED TO 20 + + + + + + + + + + + + + + + + + + + + + + + + + + + HYDROGRAPH AT 2 CWBlNED AT HYDROGRAPH AT 2 COMBINED AT RWTED TO HYDROGRAPH AT 2 COMBlNED AT HYDROGRAPH AT 2 CDMBINED AT HYDROGRAPH AT 2 COMBINED AT RWTED TO RWTED TO HYDROGRAPH AT 2 COnBlNED AT HYDROGRAPH AT 2 CWBINED AT RWTED TO HYDROGRAPH AT 2 CWBINED AT HYDRDGRAPH AT HYDROGRAPH AT 2 CDMEINED AT CL A5 CL A5 CL A5 CL A6 PT. 3 CL A7 CL A7 CL A7 CL A8 PT. 4 CL A9 CL A9 PT. 5 CL A10 CL A10 PT. 6 CL All PT. 6 CL A12 CL A12 PT. 8 CL L1 CL L2 901. 10.42 79. 10.08 975. 10.42 215. 10.08 1182. 10.33 1181. 10.42 90. 10.08 1265. 10.33 109. 10.17 1371. 10.33 126. 10.08 1489. 10.33 604. 11.67 602. 11.75 120. 10.08 639. 11.75 77. 10.08 665. 11.75 664. 11.83 108. 10.17 699. 11.83 206. 10.25 206. 10.17 443. 181. 37. 15. 480. 196. 101. 41. 581. 237. 581. 236. 42. 17. 622. 254. 51. 21. 673. 275. 58. 24. 731. 298. 416. 182. 415. 180. 56. 23. 445. 203. 36. 15. 464. 218. 464. 217. 50. 21. 492. 238. 99. 41. 97. 40. 174. 2.11 263.37 10.42 15. .20 189. 2.31 40. .50 228. 2.81 228. 2.81 233.84 10.42 16. .20 244. 3.01 20. .29 265. 3.30 23. .31 288. 3.61 175. 3.61 217.82 11.67 174. 3.61 152.54 11.75 22. .36 196. 3.97 14. .23 210. 4.20 209. 4.20 20. .34 229. 4.54 39. .49 38. .48 21 + PT. 7 412. 10.17 408. 10.25 1%. 196. ao . 80. 77. 77. .97 ROUTED TO CL L3 .97 102.40 10.25 + + HYDROGRAPH AT CL L3 123. 10.25 531. 10.25 896. 11.67 896. 11.67 59. 254. 703. 703. 24. 104. 342. 342. 23. 100. 329. 329. .39 + 2 COMBINED AT PT. 8 1.36 5.90 2 COMBINED AT PT. 8 + ROUTED TO CL A12 5.90 45.76 11.67 + & ROUTED TO CL A13 895. 11.75 703. 340. 328. + + 5.90 41.51 11.75 6.50 3.00 HYDROGRAPH AT AOUAUA + 2753. 11.00 1328. 10.75 4054. 10.83 3999. 11.00 1527. 692. 2218. 2209. 619. 281. 900. 891. 597. 271. 867. 858. HYDROGRAPH AT AOUAUB 2 COMBINED AT PT 10 ROUTED TO AOUAUF * + 9.50 9.50 323.49 11.00 + + HYDROGRAPH AT AOUAUF 512. 10.33 4402. 10.92 96. 10.08 461. 10.33 4840. 10.83 4839. 10.92 174. 10.42 4977. 10.92 666. 10.58 57. 10.50 723. 10.58 722. 10.58 102. w3. 18. 92. 1103. 1097. 35. 1132. 137. 12. 148. 148. W. 956. 18. ea. 1062. 1056. 33. 1090. 132. 11. 143. 142. + 252. 2453. 46. 223. 2716. 2716. 84. 2799. 334. 27. 361. 361. 1.11 10.61 .24 2 CWBINED AT AQUAUF + HYDROGRAPH AT AOUAUE HYDROGRAPH AT APUAUG + 1.15 3 CWBINED AT PT 11 12.00 ROUTED TO AQUA G + 12.00 .51 HYDROGRAPH AT AQUA G + 2 CDNBINED AT PT 12 HYDROGRAPH AT AOUAUC HYDROGRAPH AT AOUAUD 2 CWBINED AT PT 13 ROUTED TO AQUA H HYDROGRAPH AT I 12.51 1.65 .42 2.07 2.07 + + + + 22 + + + + + + + + + + + + + + + + + + + + + + + + 1 2 COMBINED A1 RWTED TO HYDROGRAPH A1 2 COMBINED AI 2 CWBINEO AT ROUTED TO HYOROGRAPH AT 2 COMBINED AT RWTED TO HYDROGRAPH AT 2 COMBINED AT HYDROGRAPH AT 2 COMBINED AT RWTED TO HYDROGRAPH AT 2 CWBINED AT 2 CWBINED AT HYDROGRAPH AT 2 CWBINED AT HYDROGRAPH AT 2 CW~INED AT HYDROGRAPH AT 2 COMBINED AT AQUA H PT 14 AQUA F AQUA F PT 12 PT 12 AQUA E AQUA E PT 15 AQUA D AQUA D PT 16 AQUA C PT 17 AQUA B AQUA B PT 18 PT 18 CL A13 PT 18 AWA14 PT 18 kWA A PT 19 129. 10.08 842. 10.58 840. 10.58 396. 10.08 1200. 10.50 6015. 10.75 6007. 10.75 186. 10.17 6154. 10.75 6148. 10.75 88. 10.08 6206. 10.75 112. 10.00 6269. 10.75 6261. 10.75 95. 10.08 6334. 10.75 7112. 10.75 55. 10.08 7146. 10.75 144. 10.08 7256. 10.67 86. 10.00 7311. 10.67 60. 420. 420. 182. 599. 3393. 3392. 87. 3478. 3478. 40. 3518. 51. 3567. 3566. 45. 3609. 4307. 25. 4331. 66. 4395. 39. 4432. 25. 172. 172. 75. 246. 1378. 1373. 36. 1410. 1408. 17. 1425. 21. 1446. 1441. 18. 1460. 1800. 10. 1811. 27. 1838. 16. 1854. 24. 166. 165. 72. 237. 1327. 1323. 35. 1358. 1356. 16. 1372. 20. 1393. 1388. 18. 1406. 1734. 10. 1744. 26. 1771. 16. 1786. SUMMARY OF KINEMATIC UAVE ROUTING (FLW IS DIRECT RUNOFF UITHWT BASE FLW) 23 .35 2.42 2.42 .96 3.38 15.89 15.89 .58 16.47 16.47 .28 16.75 .30 17.05 17.05 .25 17.30 23.20 .17 23.37 .43 23.80 .28 24.09 INTERPOLATED TO COPIPUTATION INTERVAL ISTAO ELEMENT OT PEAK TIME TO VOLUME OT PEAK TIME TO VOLUME PEAK PEAK (MINI (CFS) (MINI (IN) (MIN) (CFS) (MlN) (IN) CL A12 3 .43 664.48 710.03 1.92 5.00 664.47 710.00 1.92 CONTINUITY SUMMARY (AC-FT) - INFLOW= 433.201 EXCESS= ,000 WTFLOU= 430.273 BASIN STORAGE= 2.983 PERCENT ERROR= -.013 AOUA G 3 .28 4839.66 654.71 3.40 5.00 4839.17 655.00 3.40 CONTINUITY SUMMARY (AC-FT) - INFLOU= 2187.635 EXCESS= .DO0 WTFLWI 2175.267 BASIN STORAGE= 12.064 PERCENT ERROR= .014 AOUA H 3 .55 723.04 636.94 2.65 5.00 721.78 635.00 2.65 CONTINUITY SUMMARY (AC-FT) - INFLOW= 293.818 EXCESS= .OOO UJTFLW= 293.077 BASIN STORAGE- .701 PERCENT ERROR= .014 AOUA F 3 .50 841.89 639.07 2.64 5.00 839.75 635.00 2.64 CONTINUITY SUMMARY (AC-FT) - INFLOW= 342.071 EXCESS= .OOO WTFLOUE 340.482 BASIN STORAGE= 1.538 PERCENT ERROR- ,015 AOUA E 3 .27 6014.63 647.69 3.21 5.00 6007.41 645.00 3.21 CONTINUITY SUMMARY (AC-FT) - INFLOU= 2733.111 EXCESS= .OOO WTFLOU= 2724.081 BASIN STORAGE= 8.698 PERCENT ERROR= .012 AOUA 0 3 .25 6153.47 646.02 3.18 5.00 6148.12 645.00 3.18 CONTINUITY SUMMARY (AC-FT) - INFLWE 2796.112 EXCESS= ,000 WTFLW- 2792.793 BASIN STORAGE- 3.401 PERCENT ERROR; -.On3 AOUA B 3 .23 6269.33 647.31 3.14 5.00 6260.95 645.00 3.14 CONTINUITY SUMMARY (At-FT) - lNFLOU= 2867.803 EXCESS; ,000 WTFLOUi 2859.120 BASIN STORAGE; 8.393 PERCENT ERROR= ,010 *** NORMAL EN0 OF HEC-1 *** 24