HomeMy WebLinkAboutCDP 98-01A; La Costa Glen Skilled Nursing Center Expansion; La Costa Glen Skilled Nursing Center Expansion; 2008-01-02PRELIMINARY
DRAINAGE STUDY
FOR
LA COSTA GLEN
SKILLED NURSING CENTER EXPANSION
S.D.P. 98-01(A)
C.U.P. 98-01(A)
C.D.P. 98-01(A)
V08-
Original: January 28, 2008
JN: 021039
Prepared by:
O'Day Consultants, Inc.
2710 Loker Avenue West, Suite 100
Carlsbad, CA 92010-6609
Tel: (760)-931-7770
Fax: (760)-931-8680
George RCE 32014
Exp. 12/31/08
Date
PRELIMINARY DRAINAGE STUDY
LA COSTA GLEN SKILLED NURSING CENTER EXPANSION
TABLE OF CONTENTS
DECLARATION OF RESPONSIBLE CHARGE 1
1.0 INTRODUCTION 2
1.1 PURPOSE OF STUDY 2
1.2 SITE CHARACTERISTICS 2
1.2.1 Existing Conditions 2
1.2.2 Proposed Conditions 2
1.3 SOIL CLASSIFICATION 3
1.4 SITE VICINITY MAP 3
2.0 RATIONAL METHOD DESCRIPTION 4
3.0 RUNOFF CALCULATIONS 4
3.1 EXISTING CONDITION 4
3.2 PROPOSED CONDITION 5
3.3 EXISTING AND PROPOSED RUNOFF COMPARISON 5
4.0 CONCLUSION 6
5.0 REFERENCES 7
APPENDICES:
APPENDIX A - EXHIBITS
• EXISTING CONDITION HYDROLOGY MAP
• PROPOSED CONDITION HYDROLOGY MAP
• HYDROLOGIC SOILS GROUPS
APPENDIX B - HYDROLOGY CHARTS
• RAINFALL ISOPLUVIALS
• INTENSITY DURATION DESIGN CHARTS
• NOMOGRAPH FOR DETERMINATION OF TIME OF
CONCENTRATION
• RUNOFF COEFFICIENTS FOR URBAN AREAS
APPENDIX C - CAPACITY CALCULATIONS
• EXISTING STORM DRAIN CAPACITIES
<$$$^
PRELIMINARY DRAINAGE STUDY
LA COSTA GLEN SKILLED NURSING CENTER EXPANSION
DECLARATION OF RESPONSIBLE CHARGE
I, hereby declare that I am the Civil Engineer of work for this project, that I have
exercised responsible charge over the design of the project as defined in section 6703 of
the business and professions code, and that the design is consistent with current design.
I understand that the check of the project drawings and specifications by the regulating
agency is confined to the review only and does not relieve me, as engineer of work, of
my responsibilities for project design.
_ _
Geqirge O'Day^E 32014 "Date
PRELIMINARY DRAINAGE STUDY
LA COSTA GLEN SKILLED NURSING CENTER EXPANSION
1.0 INTRODUCTION
1.1 PURPOSE OF STUDY
The purpose of this preliminary hydrology study is two-fold:
1) to determine the potential hydrologic impacts of the La Costa Glen Skilled
Nursing Center Expansion proposed development;
2) to verify the capacities of the existing drainage facilities to ensure
accommodation of the proposed drainage conditions.
This report compares the proposed development hydrology condition with the
existing hydrology condition using the Rational Method as outlined in the County
of San Diego Hydrology Manual, June 2003 (SD County 2003). This report
analyzes 100-year six-hour storm event flows for the existing and proposed site
conditions. The calculated Q values are used to determine the capacity of existing
and proposed drainage structures in accordance with the City of Carlsbad
Engineering Standards, 2004 to determine adequacy to accommodate run-off.
1.2 SITE CHARACTERISTICS
1.2.1 Existing Conditions
The 4.53 acre site currently consists of a skilled nursing facility building with a
footprint of approximately 67,308 square-feet (1.55 acres) and 91 on-grade
parking stalls with private driveways along the front and rear of the building. Two
separate on-site private drainage systems collect and convey runoff generated on-
site to public storm drain systems that ultimately discharge into two separate
depollutant basins downstream. See Appendix A for Existing Condition
Hydrology Map.
1.2.2 Proposed Conditions
The proposed expansion of the skilled nursing facility will increase the current
building footprint area to approximately 68,353 square-feet, an increase of 1,045
square-feet. As a result of the larger building footprint, four existing parking stalls
will be eliminated, the existing on-site private drainage system will be modified to
accommodate expansion and the total impervious surface of the site will have a
slight increase. Existing drainage patterns will remain relatively the same except
for the said increase of impervious surface. See Appendix A for Proposed
Condition Hydrology Map.
PRELIMINARY DRAINAGE STUDY
LA COSTA GLEN SKILLED NURSING CENTER EXPANSION
1.3 SOIL CLASSIFICATION
The Soil Hydrologic Group for this preliminary drainage study is Type 'D' soil as
determined by using the County of San Diego Hydrology Manual Soil Hydrologic
Groups Map. A full size and project specific copy of the Soils Hydrologic
Groups Maps are provided in Appendix A.
1.4 SITE VICINITY MAP
CITY OF OCEANSIDE
HIGHWAYj
CITY OFSAN MARCOS
CITY OF ENCINITAS
VICINITY MAP
NO SCALE
PRELIMINARY DRAINAGE STUDY
LA COSTA GLEN SKILLED NURSING CENTER EXPANSION
2.0 RATIONAL METHOD DESCRIPTION
The rational method, as described in the SD County 2003 manual, was used to
generate surface runoff flows, which were then used to size the proposed drainage
facilities and to verify the capacity of the existing drainage facilities.
Rational equation: Q = CIA
Q = peak discharge in cubic feet per second (cfs)
C = runoff coefficient (varies with surface)
I = intensity (varies with time of concentration)
A = Area in acres
The design storm for this project is the 100-year event; the corresponding 6-hour
rainfall amount (Ps) and 24-hour rainfall amount (P2/0 were found using the
Isopluvial Charts in Appendix B. The Pe and Pi4 values are given in the following
table.
6-hour and 24-hour Rainfall
2-year
10-year
100-year
P6
1.2
1.7
2.7
P24
1.9
3.1
4.5
Pfi/P24(%)
63.2
54.8
60.0
Runoff coefficients for each area were obtained from the table included in
Appendix B. For areas with a percentage of impervious area the coefficient was
calculated using the formula:
C = 0.9(% impervious) + Cp(l-% impervious).
Areas (including % impervious) were measured from the hydrology maps shown
in Appendix A.
3.0 RUNOFF CALCULATIONS
3.1 EXISTING CONDITION
Based on the topography maps the existing site including tributary areas can be
subdivided into two drainage areas. The existing drainage areas are illustrated on
the Existing Hydrology Map in Appendix A. Corresponding runoff coefficients
(C) and rainfall intensity (I) values were derived using the SD County 2003
manual. The table of coefficients and rainfall isopluvials are included in Appendix
PRELIMINARY DRAINAGE STUDY
LA COSTA GLEN SKILLED NURSING CENTER EXPANSION
B. These values were used to calculate the peak flow for the 2-year, 10-year, and
100-year flows (Q) using the Rational Method. The drainage areas and
corresponding Q values are summarized below.
Existing Drainage Condition
Basin No Area C Iioo Qioo
Al
A2
0.96 acres
1.31 acres
0.74 5.00 in./hr.
0.73 4.67 in./hr.
3.5 cfs
4.5 cfs
3.2 PROPOSED CONDITION
The proposed hydrology conditions for the project have been designed to preserve
the existing drainage patterns to the maximum extent practicable. The proposed
site drainage conditions are shown in Proposed Hydrology Map in Appendix A.
The proposed drainage areas, and corresponding Q values are summarized below.
Basin No Area C Iioo Qioo
Al
A2
0.96 acres
1.31 acres
0.75
0.74
5.00 in./hr.
4.91 in./hr.
3.6 cfs
4.7 cfs
(1) Area of the proposed site development
3.3 EXISTING AND PROPOSED RUNOFF COMPARISON
The difference between the existing and proposed hydrology conditions are
shown below.
Condition Al A2
QIOO Existing
QIOO Proposed
Difference
3.5 cfs
3.6 cfs
+0.1 cfs
4.5 cfs
4.7 cfs
+0.2 cfs
Existing Conditions
BASIN 1
Overland flow
node 100-101
C =
A =
L =
S =
0.49
0.05
40
1.0
Soil Group D
acres
feet
%
From Figure 3-3
T= 1.8(1.1-OL"
gl/3
Ti = 6.9 minutes
From Figure 3-1
P6 = 2.7 inches
P24 = 4.5 inches
P<i/P24= 60 %
Use P6 = 2.7 inches
I = 7.44P6D-C
I = 5.76
Q =
Q =
CIA
0.1
inches/hour
cfs
Pipe Flow (6" PVC @ 1%)
node 101-102
ibarea addition =
assume Qavg =
V =
T,=
Tc =
1 =
A1 =
A2=
C1 =
C2=
C =
A =
Q =
2.4
1.7
8.6
5.00
0.47
0.49
1.00
0.49
((C1(A1)
0.96
3.5
0.96 acres
245 feet
1.0 %
0.1 cfs
fps
minutes
minutes
inches/hour
acres (Roof Top)
acres (Landscape)
acres (Roof Top)
acres (Landscape & Hardscape, 30% impervious)
+C2(A2))/(A1+A2) = 0.74
acres
cfs
Existing Conditions
BASIN 2
Overland flow
node 200-201
Soil Group D
C = 0.35
A = 0.05 acres
L = 75 feet
S = 2.5 %
From Figure 3-3
T= 1.8(1.1-CM.1'
Q1/3
8.6 minutes
From Figure 3-1
P6 = 2.7 inches
P24 = 4.5 inches
P6/P24= 60 %
Use P6 = 2.7 inches
I = 7.44P6D-°
I = 5.00
Q=
Q=
CIA
0.1
inches/hour
cfs
Pipe Flow (6" PVC @ 3.5%)
node 201-202
L= 217 feet
Savg = 3.5 %
assume Qavg= 0.1 cfs
V = 3.8 fps
T,=
Tc =
l =
A1 =
A2=
A3=
C1 =
C2=
C3=
C =
A =
Q =
1.0
9.6
4.67
0.41
0.42
0.48
1.00
0.90
0.35
minutes
minutes
inches/hour
acres (Roof Top)
acres (AC Pvmt)
acres (Landscape)
acres (Roof Top)
acres (AC Pvmt)
acres (Landscape)
((C1 (A1 )+C2(A2)+C3(A3))/(A1 +A2+A3) = 0.73
1.31
4.5
acres
cfs
Proposed Conditions
BASIN 1
Overland flow Soil Group D
node 100-101
C = 0.49
A = 0.05 acres
L = 40 feet
S = 1.0 %
From Figure 3-3
T= 1.8(1.1-CM.1*
S1'3
T, = 6.9 minutes
From Figure 3-1
P6 = 2.7 inches
P24 = 4.5 inches
P6/P24= 60 %
Use P6 = 2.7 inches
I = 7.44P6D"0645
I = 5.76 inches/hour
Q= CIA
Q = 0.1 cfs
Pipe Flow (6" PVC @ 1%)
node 101-102
subarea addition = 0.96 acres
L = 245 feet
Savg = 1 -0 %
assume Qavg= 0.1 cfs
V = 2.4 fps
T, = 1.7 minutes
Tc = 8.6 minutes
I = 5.00 inches/hour
A1= 0.48 acres (Roof Top)
A2= 0.48 acres (Landscape)
C1= 1.00 acres (Roof Top)
C2= 0.49 acres (Landscape & Hardscape, 30% impervious)
C = ((C1 (A1 )+C2(A2))/(A1 +A2) = 0.75
A = 0.96 acres
Q = 3.6 cfs
Proposed Conditions
BASIN 2
Overland flow Soil Group D
node 200-201
C = 0.35
A = 0.05 acres
L = 30 feet
S = 1.0 %
From Figure 3-3
T, = 7.4 minutes
From Figure 3-1
P6 = 2.7 inches
P24 = 4.5 inches
P6/P24= 60 %
Use P6 = 2.7 inches
I = 7.44P6D-°645
I = 5.53 inches/hour
Q= CIA
Q= 0.1 cfs
Pipe Flow (6" PVC & 1%)
node 201-202
L = 78 feet
savg= 1.0 %
assume Qaug= 0.1 cfs
V = 2.4 fps
TM = 0.5 minutes
Pipe Flow (6" PVC 3 3.5%)
node 202-203
L= 217 feet
SaVg = 3.5 %
assume Qaug= 0.1 cfs
V = 3.8 fps
Tc = 1.0 minutes
Tc = 8.9 minutes
I = 4.91 inches/hour
A1= 0.43 acres (Roof Top)
A2= 0.41 acres (AC Pvmt)
A3= 0.47 acres (Landscape)
C1= 1.00 acres (Roof Top)
C2= 0.90 acres (AC Pvmt)
C3= 0.35 acres (Landscape)
C= ((C1(A1)+C2(A2)+C3(A3))/(A1+A2+A3) = 0.74
A = 1.31 acres
Q = 4.7 cfs
t*****************************************************************
* O'Day Consultants, Inc. *
* 2710 Loker Avenue West, Suite 100 *
* Carlsbad, CA 92008 *
* Tel: 760-931-7700 Fax: 760-931-8680 *
Inside Diameter
( 6.00 in.)
*
* *
* *
Water
* ( 1.57 in.)
( 0.131 ft.)
|
|
* v
Circular Channel Section
Flowrate 0.100 CFS
Velocity 2.438 fps
Pipe Diameter 6.000 inches
Depth of Flow 1.572 inches
Depth of Flow 0.131 feet
Critical Depth 0.156 feet
Depth/Diameter (D/d) 0.262
Slope of Pipe 1.000 %
X-Sectional Area 0.041 sq. ft,
Wetted Perimeter 0.537 feet
ARA(2/3) 0.007
Mannings 'n' 0.011
Min. Fric. Slope, 6 inch
Pipe Flowing Full 0.023 %
*****************************************i ***************************
O'Day Consultants, Inc.
2710 Loker Avenue West, Suite 100
Carlsbad, CA 92008
Tel: 760-931-7700 Fax: 760-931-8680
Inside Diameter
( 6.00 in.)
Water
* ( 1.15 in.)
( 0.096 ft.)
v
Circular Channel Section
Flowrate 0.100 CFS
Velocity 3 .789 fps
Pipe Diameter 6.000 inches
Depth of Flow 1.153 inches
Depth of Flow 0.096 feet
Critical Depth 0 .157 feet
Depth/Diameter (D/d) 0.192
Slope of Pipe 3 .500 %
X-Sectional Area 0.026 sq. ft
Wetted Perimeter 0.454 feet
AR* (2/3) 0.004
Mannings 'n' 0.011
Min. Fric. Slope, 6 inch
Pipe Flowing Full 0.023 %
PRELIMINARY DRAINAGE STUDY
LA COSTA GLEN SKILLED NURSING CENTER EXPANSION
4.0 CONCLUSION
The net increase in storm water run-off due to the proposed building expansion is
approximately 0.1 cfs for Basin Al and 0.2 cfs for Basin A2. Capacity
calculations shown in Appendix C, for the existing drainage structures show that
the downstream drainage structures are adequate to accommodate the net increase
in the 100-year flow.
PRELIMINARY DRAINAGE STUDY
LA COSTA GLEN SKILLED NURSING CENTER EXPANSION
5.0 REFERENCES
City of Carlsbad, Engineering Standards, 2004.
San Diego County Hydrology Manual, County of San Diego Department of Public Works
Flood Control Section, 2003.
APPENDIX A
PRELIMINARY DRAINAGE STUDY
LA COSTA GLEN OFFICES
APPENDIX A - EXHIBITS
• EXISTING CONDITION HYDROLOGY MAP
• PROPOSED CONDITION HYDROLOGY MAP
• HYDROLOGIC SOILS GROUPS
APPENDIX B
PRELIMINARY DRAINAGE STUDY
LA COSTA GLEN OFFICES
APPENDIX B - HYDROLOGY CHARTS
• RAINFALL ISOPLUVIALS
• INTENSITY DURATION DESIGN CHARTS
• NOMOGRAPH FOR DETERMINATION OF TIME OF
CONCENTRATION
• RUNOFF COEFFICIENTS FOR URBAN AREAS
33*30-
331
32'3ff 32-30-
County of San Diego
Hydrology Manual
Rainfall Isopluvials
2 Year Rainfall Event - 6 Hours
Isopluvtal (Inches)
DPW CIS
VW: HAXV San l^tc^ f ^JVCTC
:33*30t
32-30-3T301
County of San Diego
Hydrology Manual
Rainfall Isoplnvials
2 Year Rainfall Event - 24 Hours
IsopkwU (Inches)
CIS
303 Mile*
33-00-
32M51
32-30-32*30-
County of San Diego
Hydrology Manual
Rainfall Isopluviab
10 Year Rainfall Event - 6 Hours
hopluvlal (Inches)
DPW CIS
303 Miles
33-30
32°30'
County of San Diego
Hydrology Manual
Rainfall Isopluviab
10 Year Rainfall Event - 24 Hours
•— !K>pluvW(lnchS8)
GIS
.33W
saw
32M51
32-301
County of San Diego
Hydrology Manual
Rainfall Isoplwiais
100 Year RainfaH Event - 6 Hours
topluvW (Inches)
D CIS
32*30'
County of San Diego
Hydrology Manual
Rainfall Isopluvials
100 Year RainfiUl Event - 24 Hours
IsopluvM (Inches)
GIS-
303 Mites
san-diego.ca.us/dpw/watersheds/pubs/susmp_85precfp.pdf - Micros
Favorites Tools Help
met Explorer
4=*Back " ». > •'$j^Favorites
AQUA HEDIONDA LAGOON *
BAHQUFFOSLAGOON
RESERVOIR
< 48x36 in TP"" H KK jj
| Address jSj http: jjwww. co. san-diego, ca. us/dpw/watersheds/pubs/susmp_85precip. pdf
cjDone
H **!• f Autodesk Land D...| jgtotodeskLandD...} 0 Wmdcm Media... } ^http!//www.carb., ||@l>ttp://wiTOi.co....
Internet
iT
10.0
9.0
8.0
7.0
6.0
5.0
4.0
3.0
2.0
"C"
th.o
-0.9
gO.8
fo.7
0.6
0.5
0.4
0.3
0.2
^^
^
S
s
^
>,
s,
s
^
^
t
^
r^,
V
Ss,
I
i
^
^
^
S
%
S
<s
s
^V
S
s^
V
s
V
^
\
i
\
^
^
s,
s
\
ss
s
.
s
/ V;
%
w
S
s
s
V
>
^
s
V,
t
S
s
^
\
>
s
sfc
^1SN
l\'VsX
S S . * . ' , ' ^
i!l. :!::,::!:: : i
1 = 3.2 iii/hr ^ " n , * ' k ' ' ' '
J1
\
^
s
^
S
^
»
Sj
i 1
\
N.
\
\
N '>». '''• , ' '
s^'^'x'1'1- ''''
^:;x"- I
NX-/":: |:
''*!1
f
it
^^;;;;;;::
, t , . .
if. — 20 min ! 1
\ '
EQ
1 = 7.44 ^
P6= 6-Houi
N«,|'' '•• r
SS |'i.
;•"''' ' : >SK
x'N :oS
's '' ' ""S
N ''''., '^SS
*» ••, I1' ^
'' ' ' i ^ Ssi
' fl ^k -j
"s J s
''•' , f r ^s
'i
;;;;:;;;:; b
Si: == =
| _
•- ^ J | — — —
T
... [. . • • • f
'" f f
: 1 i
;
JATION
6D-0.645
ity(in/hr)
r Precipitation (in
on(min)
s"
«s
^
S,
s,1"
s
^^ s
^ 1 ? h
^ ^ 1 ' 1
^ N ' fc *
*«l , J> J '
1 1
h '
'*M r>,
N,T I1',
*ss ».
* > ^
;====;=;;
. . . . -S , It . .
•4— 4
5 6 7 8 9 10 15 20 30 40 50 1 2 34
Minutes HoursDuration
Dlraett
• • • (1)Ffoi
fort
Cou
in ir
(2)Adji
the
aoo
_ (3) piot
. (4} Dr»
(5) This
ber
on* for A
tiprecipitz
hesetecto
nty Hydro!
le Design
jst 6 hr pr
range of A
licapleto
Shrprec
walinetH
> line is th<
\Q analyze
I! Application For
g (a) Selected freq
I (b)P6S
j 60 j <c)Adji
C R fiJ
5.0 1 (d>*ic"
4-5 ? (e) I =
4-0 13-5 ~ Note: T
30 C
ITUI1 «*91 ' , j F6 _^
' ' : [ ^
j I.T 10• 1 5 15
: : .| 20
• • • ! 25
3fl! i{ 40: : •1-° so
90
120
150
180
56 300
360
istedP6<2
r ,
**Jr-~ ID
Tits chart
urvesuse
pplieation:
rtion maps determi
<J frequency. Thes
ogy Manual (10, 50
arid Procedure Mi
acipitatfon(ifnece
«% to 65% of the
Desert).
Dilation on the rig
rough the point pa
9 intensity-duratior
id.
n:
jency 10 yea
in..P.4= 3.1
)- A? in.
nin.
./hr.
replaces the Inten
d since 1965.
I
ne 6 hr and 24 hr amounts
a maps are included in the
, and 100 yr maps included
•tnual).
ssary) so that it is within
24 hr precipitation (not
it side of the chart,
irallel to the plotted lines.
i curve for the location
r
D_§. = *><}. & %w
P24
sity-Duration-Frequency
i _i I . _ i. . .': .. i L '-. i.f 1 ;14>i i I i
2.63 !3.95
2Tl2J3.liH
1 30 '195
1.08 jl.62
6.93 11.40
083 lfJS4'
6.69 li.03
0.60 [0.90
0.41 0.61
034 !0~Si
029 16.44
0^6 16.39
OJ22 • 6.331
0.19 6.28.
6.17 iO.25
2 j 2.5 3 : iSi ' 1 1 i i 1
JS|JJ*J7J»'?J?
L3.37HT21 (S.05tpO
2.59 1 124 i 3 89 f 4^4iittSMiaasJirr
1.66iiL07i2.49i2.9o]
1.19 i 1.49 '1.79 i! 2.09
1J»!1.33TiLS9iii6
6.82! iiOJt'ijBil 43
0.68 -aSS 11.021 1.19i
0.591 0.73- 0.88 '; 1.03:
6.52 j 6.65 : 0.78] 6.91
6.43! 6.54 i6.85i6.76]
bi38i6.47 OJ56j6.iS6
6.3316.42 6.50)0.58
4 < 4.S ' S I £5 ! 6i i I i i i i i i
10.54s 1 1.86M3.171 14.49 15.81
8.481 9.54 iiOJSOl 11.66 '12.72
£L74r7.58 i 8.421 8L27ll6.il
5 19 1 5.84 5 649 1 7 13 ^779
4.31 j 4.85 j 5.39 \ 5.93 i 6.46
3.73 I 4.20 ! 4.67 [ 5.13 f 5.60
3.32 f 3.73J 4.15 ! 4.56 I 4.98
2.76 T 3.10 i 3.45 1 179 ; 4.13
2.39 i 2.69 '. 2.98 > 3.28 > 3.58
2.12 1 2.39 | 2.65 > 2.92 1 3.18
1 63 1 1 84 (2.04 ' 2.25 > 245
l!36 ! 1.53 i 1.70 i .87 1 2.04
i.isT] 1.32T 1.47: .62 ; 1.761.04 1 i.18'1 1.31 ; .44 i 1.57
087 [6.98! 1.08 : .19 [1.30
6.75 I 6.85! 6.94 .03' 1.13
0.67 i 6.75 ! 6.84 : 6.92 '• 1.00
FIGURE
Intensity-Duration Design Chart - Example 3-2
EQUATION
7,44 PQ Q-0.645
I - Intensity (in/hr)
P6* 6-Hour Precipitation (in)
D = Duration (min)
Directions for Application:
(1) From precipitation maps determine 6 hr and 24 hr amounts
for the selected frequency. These maps are included in the
County Hydrology Manual (10,50, and 100 yr maps included
in the Design and Procedure Manual).
(2) Adjust 6 hr precipitation (if necessary) so that it is within
the range of 45% to 65% of the 24 hr precipitation (not
applicapte to Desert).
(3) Plot 6 hr precipitation on me right side of the chart.
(4) Draw a line through me point parallel to the plotted lines.
(5) This line is the intensity-duration curve for the location
being analyzed.
Application Form:
(a) Selected frequency
(6) Pg = .../'2-.. in., P24
(c) Adjusted P6<2> = /•! in.
(d) ^ = ^ min.
(e) I * 2,1- in./hr.
Note: This chart replaces the Intensity-Duration-Frequency
curves used since 1965.
i 1 1145 pf 12J5"'
T'n t J t~i "i > i ] &Sf-r
VI ~n~in'i''M
«
"M
~p
""90
180-
300"
2.63 ,
3.18
1-66J.2J53
T30Tt.95
0.93 11.40
0.83 ,'i.w
0.69 ilXO
OedTaaO;
0,34 10.51
0.29J0.44
OJ22 '6;jJ3
&27T&58!
3.37
7.90 i 9.22
6.36 7.42
3.89j
2.15; 2,69 J3L23
t~.87r2.33'few'
1.6Si2J>7F2.49 2.90
3.77
357
i.ue i.9aii.saii.8e
OJKflJBjlJBiixB
6:68 ;O85i 1.02] 1.19
1064^1^61 i 15.81
7.58'
6.19
_3.73
_
6.49. 7.13 1739"'"— - ,
4.20 ! 4j7T5."l3"! 15.60'" "
2.39 j 2.69 i 2.98 !
p2 r£38 fzM'l
p|tl|i|$ If ^lOSfl"}^^ I"l.w1"t!;3l"t'
o^i_^IS-iwjaTOijJwjawJ.t.pe|
; 4.56.!
3.28
2.92
ZS&
0.47^0.56! 0.66 i 0.75 ) 0.85 ! 0.94
at? i6J2s?o^33f6>K;ai50las8Toi67 T O/TS 1 a84
1.44
1J9
1.03
0.92
! 4.13
I 3.58r3.i8
! 2,45
1 2.04
i 1.76r'l-s?
! 1.30
; 1.13
J1.00
FIGURE
Intensity-Duration Design Chart • Example 3-2
10.0
9.0
8.0
7.0
6.0
5.0
4.0
3.0
2.0
i5
1
P-9
"§0.8
|07
0.6
0.5
0.4
0.3
0.2
0.1i
\
^^^! ^^^J
SvfSsJ^
s^ ! *S<
s-^sIsJ^
rO
!xj | ^
S^L
|^
! I
I \
1 !
! 1
I :
1 '
i •
\ I
\ •i !
^L
„„., !_!,„;. - .
-H-H
; . ; |~
K,
"X
....
f i-
.sl**s»,
Sx
sh
s
^"^>
I
Ss
. S _
I
j
!\I
...
:
'
s,
's
k
.
^,
—i
1
sHi•v
^•s
«
^
>
s
s,
N
s
\
\
~i-i
1
~i
~
%
^
*
|| Jgj id
St'Ml
*i{ ''is 5'*' s'is Sj'Hl,;
Si' fj'ir '
lUlJto '"v ! «
T ' S j] T
I lil
- *N«J j- tJJ
IT i t
T I f
T TJ T
• T* t-f
_l T--T — •• 'f •;! —~i j f t
~""T f IT
t ! ^ ^ • 1
E
1 = 7.44
P6 = 64k
n, D = Dun> ' > , B
;•'!>!! 'ij t"k'v\:'':'|: :J
* v ^
( '''•,,'" S r ^
L ^ifr- :kI T ''-.,
B Sx.,,
" %
1
N
- l-t
- L I r •
. i" :t t ' \ !
(1 :T T !
V -'
QUATION
P6 0-0.645
isity (in/hr)
Hir Precipitation (in)
rtton (min)
s
N
1
S
s
1
s
•>
11
N
i'vs>>^ \
ssN
s N*
s: *
. s
\h
>
s
*s
"V_ * s -
> 6 7 8 9 10 15 20 30 40 50 1 2
Minutes
Duration
I
„
::|:i;:;
> *s «i
„ -, '«,*2 '"'> ' >,
> , ''«,•S><-(1|
T
_ . - it .
1
I
3 4
Hours
p«4TrmJ
IT Directions for Application:
. . . IL H\ From precipitation maps determine 6 hr and 24 hr amounts
., , 1 for the selected frequency. These maps are included in the
| County Hydrology Manual (10, 50. and 100 yr maps included
• jjr in the Design and Procedure Manual).
, |L (2) Adjust 6 hr precipitation (if necessary) so that it is within
I the range of 45% to 65% of the 24 hr precipitation (not
< jfj- applicaple to Desert).
iJI (3) Plot 6 hr precipitation on the right side of the chart
i i illl IA\ Draw a HnA thmtinh thA rmlnt ftnrallc*! to tK@ olottfid lines
|L (5) This line is the intensity-duration curve for the location
j[j being analyzed.
JT Application Form:
|| ^ (a) Selected frequency ,,'^;:-." year
1 i 1 1 60 t (c> Adjusted P6<2> = P7- in.
'! BL55 ^ C' -,..".'"'-'• '"'••'
i HI 3,0 3 « ii.T.T- ^ ^ j * , i, ,y-
III, I.4'5]? (e)l= ^M jn./hr. ... ~) .,
' ' I lil Note: This chart replaces the Intensity-Duration-Frequency
11 I Hr 3 ° curves used since 1 965.
flB 2.5 ; • : : : ; ' •
' < , [{T P6 1 i tiS ! 2 i SUi : 3 i *34> 1 4 i 4.5 : 5 i S.S 6NlU Duwiton t i i i ; 1 ; i i i j ; i ; i s i i
1(11 5 i'.eS 3.95' S'i?' 6.59 7.90i9.22i 10.54 11.86; 13.17 14.49 15.81
I i If 7 2.12 ]a.i8i4JSn 5^10 '6.36: 7.42'T 8.48 1 9.64 i 10.60i 11.66 12.72
: : ffl 10 1.68 ;2.53T3.37 i 4.21 r5X)Si5.90[ 6.74 j 7.58 1 8.42 I 9.27 10.1 1
• rnr 1 5 15 1 30 1 95^259 3T24'389 4541 5 19 584 : 649 7 13 778
•• • IT & 1-CB ;-t.62iai5] 2i69li2l3"'3l77T4.31 1 4.85 i &39' f 5.93 6.46
•• • ffl 25 0.93 1.40 j 1.87, 2.33 2.80 3J27! 3.73 i 4.20 i 4.67 i 5.13 5.60
! ! if 30 6J3 i li24! 1.66! 2.07 > 2.49 i 2.90! 3.32 3,73 U.15 ' 4.56 4.96
. I i If 1'° 50 6.60 6.90! 1.19: 1.49 • 1.79:2.09; 2.39 ; 2.69 1 2.98 3.28 3.58
• • • • jjl 60 6.53 0.80' 1.06 i 1.33 1.59 1.861 2.12 i 2.39 • 2.65 : 2.92 3.18
" ' f m 90 6.41 ;0.61f0.82 1.02'; 1.23; »-43i 1.63 1.84 i 2.04 2.25 2.45
' ". ffl 120 6.34 i0.51|a68:6.iS5' 1.6211.19; 1.36 i 1.53 i 1.70 : 1.87 2.04
U ISO 059 !0.44!0.59ia73 0.88i1.03i 1.18 i 1.32 I 1.47 1.62 1.76
i" U li» 6i26 ;6.39i6"i52 ! 6.65; 6.78! 0.91 T 1.04; 1.18 h. 31 1.44 1.57
"i"""1 240 6.22 ;0.33|6.43] 6.54 0.65;6.76T 6.87 i 6.981 1.08 1.19 1.305 6 300 6.19 j6^d!6.38i 6.47; 6.56 i 6^66; 6.75 ! 0.85 i 0.94 1.03 1.13
360 0.17 ' ;0is' 6.33i 6.42* 0.50 i 6.58: a67r 6.7510.84 6.92 1.00
FIGURE
Intensity-Duration Design Chart - Template 3-1
San Diego County Hydrology Manual
Date: June 2003
Section:
Page:
3
6 of 26
Table 3-1
RUNOFF COEFFICIENTS FOR URBAN AREAS
Land
NRCS Elements
Undisturbed Natural Terrain (Natural)
Low Density Residential (LDR)
Low Density Residential (LDR)
Low Density Residential (LDR)
Medium Density Residential (MDR)
Medium Density Residential (MDR)
Medium Density Residential (MDR)
Medium Density Residential (MDR)
High Density Residential (HDR)
High Density Residential (HDR)
Commercial/Industrial (N. Com)
Commercial/Industrial (G. Com)
Commercial/Industrial (O.P. Com)
Commercial/Industrial (Limited I.)
Commercial/Industrial (General I.)
Use
County Elements
Permanent Open Space
Residential, 1.0 DU/A or less
Residential, 2.0 DU/A or less
Residential, 2.9 DU/A or less
Residential, 4.3 DU/A or less
Residential, 7.3 DU/A or less
Residential, 10.9 DU/A or less
Residential, 14.5 DU/A or less
Residential, 24.0 DU/A or less
Residential, 43.0 DU/A or less
Neighborhood Commercial
General Commercial
Office Professional/Commercial
Limited Industrial
General Industrial
Runoff Coefficient "C"
% IMPER.
0*
10
20
25
30
40
45
50
65
80
80
85
90
90
95
A
0.20
0.27
0.34
0.38
0.41
0.48
0.52
0.55
0.66
0.76
0.76
0.80
0.83
0.83
0.87
Soil Type
B
0.25
0.32
0.38
0.41
0.45
0.51
0.54
0.58
0.67
0.77
0.77
0.80
0.84
0.84
0.87
C
0.30
0.36
0.42
0.45
0.48
0.54
0.57
0.60
0.69
0.78
0.78
0.81
0.84
0.84
0.87
D
.0.35/
0.41
0.46
0.49
0.52
0.57
0.60
0.63
0.71
0.79
0.79
0.82>**"*"""'"'*<''.
C 0.85/
0.85
0.87
The values associated with 0% impervious may be used for direct calculation of the
coefficient, Cp, for the soil type), or for areas that will remain undisturbed in perpetuity.
is located in Cleveland National Forest).
DU/A = dwelling units per acre
NRCS = National Resources Conservation Service
runoff coefficient as described in Section 3.1.2 (representing the pervious runoff
Justification must be given that the area will remain natural forever (e.g., the area
3-6
APPENDIX C
PRELIMINARY DRAINAGE STUDY
LA COSTA GLEN OFFICES
APPENDIX C - CAPACITY CALCULATIONS
• EXISTING STORM DRAIN CAPACITIES
******************************************
O'Day Consultants, Inc. *
2710 Loker Avenue West, Suite 100 *
Carlsbad, CA 92008 *
Tel: 760-931-7700 Fax: 760-931-8680 *
Inside Diameter
( 18.00 in.)
Water
* ( 16.88 in.)
( 1.407 ft.)
v
Circular Channel Section
Flowrate
Velocity
Pipe Diameter
Depth of Flow
Depth of Flow
24 . 910
14.468
18 . 000
16 . 884
1 .407
CFS
fps
inches
inches
feet
Critical Depth ............ Greater than Pipe Diameter
Depth/Diameter (D/d) ..... 0.938
Slope of Pipe ............. 4 . 860 %
X-Sectional Area .......... 1.722 sq. ft.
Wetted Perimeter .......... 3 . 951 feet
AR*(2/3) .................. 0.989
Mannings 'n1 .............. 0.013
Min. Fric . Slope, 18 inch
Pipe Flowing Full ...... 5.624 %
(St.*