Loading...
HomeMy WebLinkAboutCDP 99-32; JENSEN RESIDENCE; Hydrologic Analysis and Report Study; 2000-06-14OWEN ENGINEERING GROUP Civil, Geotechnical and Structural Encintxrinc June 14, 2000 Site: Proposed Residence Parcel No. 1; Parcel Map Number 18236 Carlsbad, Califomia Subject: Drainage Study and Report for Proposed Single Family Residence Reference: 1. Grading Plans (Sheet 2&3) Prepared by Hossein Zomorrodi; R.C.E 43235 Dear Sirs: This report presents the results of our hydrologic analysis and drainage study for the proposed residence located on Parcel Nxraiber 1,Parcel Map Number 18236, in the City of Carlsbad Califomia. The scope of our hydrologic analysis was to quantify drainage eminating from the site, during a 50-year frequency rain event, analyzing the proposed drainage system for capacity, and determining surface drainage flow direction. This drainage study was performed utilizing methods of analyses that are outlined in the County of San Diego Drainage Design Manual. Our analysis was based on topographical and proposed finish grade information show on the current grading plan, prepared by Hossein Zomorrodi, R.C.E 43235. We have studied the grading plan and determined that four separate areas generate surface drainage from the site ( See Site Plan). Based on review of the grading plans there are two separate drainage systems consisting of 4-inch diameter P. V.C pipe that collect and direct the majority of the drainage generated from the proposed building site. One drainage system parallels the northem property line and the other exists along the southem property line, both convey drainage towards the westem property boundary. Drainage collected from these two systems will be directed into a proposed earthen drainage swale, located at the northwest end of the subject property. 1525 Grand Ave, San Marcos, Califomia 92069 Telephone (760) 471 - 6000 Fax (760) 471-6096 14661 Myford Road, Suite C, Tustin, California 92806 Telephone (714) 734 - J993 Fax (714) 734-9732 CII r -i2 The earthen swale will be constmcted to direct drainage flows within a non-exclusive drainage easement located at the southem property line. (See Accompanying Grading Plan). We have performed calculations to determine if the proposed drainage system is adequate to convey flows generated from the 50-year rain event. Based on our calculations all proposed drainage systems are adequate. All hydrologic and hydraulic calculations performed for this study for are provided with this report. The professional opinions presented in this report have been developed using that degree of care and skill ordinarily exercised, under similar circumstances, by reputable civil engineering and geotechnical consultants practicing in this-or similar localities. No other warranty, expressed or implied, is made as to the professional advice included in this letter. Sincerely, Owen Engineering Group Charles J. Randle, PE RCE 22096, CA INTRODUCTION This report summarizes the methods used and the issues encountered during the Planning Study process. It also includes recommendations of the preferred alignments along both Carlsbad Boulevard and Cannon Road. The limits of the roadways included in the study are as follows: CARLSBAD BLVD.- from 800' north of the intersection at Cannon Road southerly to just south of Manzano Drive a distance of 3400'. CANNON RD.- from the intersection at Carlsbad Blvd. easterly to just west of the AT&SF railroad tracks a distance of 1200'. The goal ofthis study is to provide engineering guidelines for the future improvement of carlsbad Blvd. and Cannon Rd. The guidelines developed for these two streets should: 1) Ensure that the widened street will accommodate future traffic volumes and tuming movements. 2) Recognize the importance of on-street parking. 3) Provide for pedestrian and bicycle safety. 4) Ensure that reasonable driveway access is maintained to serve the properties fronting along Carlsbad Blvd. 1 (> V OmTtlKAy EXIST. EDGE 0F| PAVEMENT FDR FUTURE STOECT IMPROVEMENT SEE DWO. f 331-7 CARLSBAD BOULEVARD , - 3 T li C0> mm f m-t'^miim-imimtii^uiiiij 4' rrf^ rr. j:fS:ir {4 I/. (2, m / "7^ 7^ 4^- 7^ INTENSITY-DUjV\TION DtiIGN CHART TnTlTlllliitii i-i-'i'-*<M''','''''"'''"'m'f=''T ;-i" ilLiaa-Lidi-HirrifliT!i i Equation; I = 7*44 P. D I = Intensity (Zn./Hr.) = 6 Hr. Precipitation (In.) Directions for Application: 1) From precipitation naps determine 6 hr. and 24 hr. amounts for the selected frequency. These maps are printed in the County Hydrology Manual (10, 50 and 100 yr. maps included in the Design and Procedure Manual). 2) Adjust 6 hr. precipitation (if necessary) so that it is within the range of 45% to 65% of the 24 hr. precipitation. (Not npplicable f ^ to Desert) 3) Plot 6 hr. precipitation on the right side of the chart. 4) Draw a line through the point parallel to the plotted lines. 5) This line is the intensity-duration curve for the location being analyzed. Application Form: . 0) Selected Frequency yr. 1) Pe ' • ^24" % " ^* 2) Adjusted *Pg= ^rZ^Q 3) t^ = min. 4) I = ^in/hr. 24 in. *Not Applicable to Desert Region 40 50 1 COUNTY OF SAN DIEGO DEPARTMENT OF SANITATION 6- FLOOD CONTROL 50-YEAR 6- ISOPLUVIALS HOU ^ PRECIPITATIOE^ OF 50-YEAR G-HOUR PRECIPlTATiQM IM TOiTilS OF ftfi liJCH NATIONAL OCEANIC AND AT SPECIAL STUDIES BRANCH, OFFICE OFH U.S. DEPARTMEr T OF COMMERCE I., .. I I. I i 1.. . • i COUNTY OF SAN DIEGO . DEPARTMENT OF SANITATION $• FLOOD CONTROL 50-YEAR 24-HOUR PRECIPITATION 30» 15' 33* -ny ISOPLUVIALS Pt*pa ECIAL STUDIES DKANCII, OFFICE OF II 30* VTUSIV OF 50-YEAR 24-HOllR PRECIPITATIOM IN TENTHS OF AN INCH .-d by U.S. DEPARTMEN P OF COMMERCE NATIONAL OCEANIC AND AT^ OSPIIERIC ADMINISTRATION DKOLOGY, NATIONAL WEATHER SERVICE 118" 30' \5' 117 RUNOFF COEFFICIENTS (R.'SLTIONAL METHOD) LAND USE Coefficient, Soil Group C (1) A B C D Undeveloped . 30 .35 .40 .45 Residential: Rural . 50 . 35 .40 .45 Single Family .40 .45 .50 . 55 Multi-Units .45 .50 .60 . 70 Mobile Hemes (2) .45 .50 .55 .65 Commercial (2) 80% Impervious .70 . 75 .80 .85 Industrial (2) .80 .85 .90 .95 90% Impervious NOTES: (1) Obtain soil group from maps on file with the Department of Sanitation and Flood Control. (2) Where actual conditions deviate significantly from the tabulated imperviousness values of 80% or 90%, the values given for coefficient C, may be revised by multiplying 80% or 90% by the ratio of actual imperviousness to the tabulated imperviousness. However, in no case shall the final coefficient be less than 0.50. For example: Consider commercial property on D soil group. Actual imperviousness = 50% Tabulated imperviousness = 80% Revised C = |2.X 0.85 = 0.53 AUPPWntY TY OWEN ENGINEERING GROUP Civil, Gcolcchnical and Slrudural Engineei iiiv; June 14, 2000 Mr. Jon Jensen Jon A Jensen and Associates 451 South Escondido Blvd Escondido, CA 92025 Subject: Review and Update of Applicable Geology and Geotechnical Reports re: Parcel No. 210-120-30, Carlsbad, Califomia Dear Mr. Jensen: This infomiation is presented in a format which updates all of the referenced reports relative to the development of your site. Prior to this report, these reports addressed bluff stability and recommended setbacks relative to the construction of the proposed dwelling at this site. Applicable criteria for this development are summarized as followed. Where these values may differ in the original reports, the design parameters are updated herein and are applicable to your proposed residence. As noted in previous reports by this office, the recommended setback from the bluff is 40 feet from the top of the existing bluff. Design criteria are as follows: Item 1. Lateral pressure evaluation based on the angle of intemal friction at 32 degrees and cohesion of 100 pounds psf Item 2. Unit soil bearing for continuous foundations located a minimum of 18 inches below lowest adjacent grade shall not exceed 2500 psf This is a conservative value based on the Terza^ Unit Bearing Value Formula for this type soil The unit soil bearing value maybe increased 500 pounds psf for each additional 12 inches of embedment of the footing relative to the lowest adjacent grade to a maximimi of 4000 psf Grade measurements, in the event of a basement-type structure, relate to the measurement of the inside or lowest adjacent grade. This is not a reference to the finished exterior pad grade. 1525 Grand Ave, San Marcos, Califomia 92069 Telephone (760) 471 - 6000 Fax (760) 471-6096 14661 Myford Road, Suite C, Tustin, California 92806 Telephone (714) 734 - 7993 Fax (714) 734-9732 ^ FILE COPY Item 3. The soil, as tested, is nonexpansive and no special provisions for slab-on-grade or similar considerations are required. Item 4. The foundation system along the westeriy perimeter of the dwelling may include end bearing caissons placed on fonnation material, located approximately 5 to 8 feet below grade. Unit soil bearing on formation material shall not exceed 6000 psf The caisson system is an option. The proposed perimeter grade beam/foundation will adequately support the proposed structure Caisson distribution and spacing shall be a part of the structural evaluation and the dwelling and its foundation system. Note: this is only a recommendation and is not a requirement for the dwelling "bluff setback" as 40 feet. Item 5. All slab on grade systems will require a sub-base material to consist of compact dense free draining soil and/or gravel. Sub-slab materials, within the living areas, will require the placement of at least 6 mil visqueen and 2 inches of sand as a leveling course. Concrete slab-on-grades are recommended to be a minimum of 4 inches of thickness and contain reinforcing steel as will be directed by the structural engineer. A minimum would be a 6 gauge welded wire mat or as directed by the structural engineer. The above items are specifically directed to the criteria necessary to design of this building. The construction procedures shall be observed during embankment construction, or prior to foundation concrete placement. This inspection will be to insure that the foundation dimensions, locations are per this report and the associated restrictions imposed by these referenced reports which are considered a part of this document and per project plans and specifications. Site drainage must confoim to criteria established to address bluff protection. All drainage shall be directed away from the dwelling foundations. All drainage to the public right-of-way (roadway) shall be in conformance with applicable standards (City of Carlsbad, Califomia). This report is an update to the attached report dated March 16, 1998. Limitations Professional judgements presented herein are based partly on our evaluation of the available technical information that was reviewed, partly on our understanding of the proposed construction, and partly on our general experience in the civil and geotechnical field. The recommendations and civil engineering basis of design were based on the assumption that the soil conditions present at the site do not deviate considerably from those presented in the referenced reports and investigations performed by others (see references). If variations or undesirable geotechnical or soil conditions are encountered during construction, the engineering geologist and civil engineer should be notified immediately and consulted for further recommendations. We do not guarantee the performance of the project in any respect. This firm does not practice or consult in the field of safety engineering. We do not direct the contractor's operations, and cannot be responsible for the safety of other than our own personnel on the subject site; therefore, the safety of others is the responsibility of the contractor. The contractor should notify the owner if he considers any of the recommended actions presented herein to be safe. Sincerely, Owen Engineerin C. J. Randle, P.E. RCE 22096 CA References 1. Geotechnical Update, Carisbad Beach Lot, APN 210-120-30, Carisbad Drive, Carisbad, Califomia; 1966, by Geotechnics, Inc., Project No. 0319-001-00, dated September 3, 1996. 2. Geotechnical Investigation and Bluff Retreat Study. Parcel No 210-120-39, Carlsbad, Califomia; 1991, by ICG, Inc., Job No. 04-8529-001-00-00, dated March 28,1991. 3. Geotechnical Investigation and Bluff Refreat Study, Parcel No. 210-120-31, Carisbad, Califomia; 1989, by ICG, Inc., Job No. 05-8109-001-00-00, dated November 6, 1989. 4. California's Battered Coast; 1985, Califomia Coastal Commission Meeting, Professional Papers and Publication, San Diego, Califomia, September, 1985 San Diego Association of Geologists. 5. Supplemental Geotechnical Investigation, Proposed Coastal Protection Measures for the 2+1- acre coastal site, Carlsbad, Califomia; 1984, by Converse Consultants, Project No. 83-2299-02, dated September 20,1984. 6. Geotechnical Investigation, Proposed Coastal Protection Measures for Ecke Site, Carls bad, Califomia; 1984, by Converse Consultants, Project No. 83-02299-01, dated February 1,1984. APPENDIX A UNIT SOIL BEARING VALUES TERZAGHI'S BEARING CAPACITY EQUATION CONDITIONS Friction Angle ^ = 32-deg Cohesion c := lOO psf Maximum Density y:=120 pcf Footing Width B:=lft z .= 1-ft, 1.5 ft.. B Footing Depth D =66 in Effective Overburden Pressure q :=r D q=660'psf TERZAGHI VARIABLES (see table 4-1 of Foundation Analysis and Design, Joseph E. Bowles) For strip round square SJ. 1.0 1.3 1.3 S(, -1 S.^ 1.0 0.6 0.8 8.^:=] N Factors (For the following values, see Terzaghi bearing-capacity values) N^;=44.90 N„;=29.5 N.,:=27.8 Bearing Capacity Allowable Bearing Capacity q^jt(z): = c N^.S^+q-Nq+0.5-r.z.N.^.S^ SF: = 4 q^(z) SF z qult(2) ^a(^) - = I ——=25628 ~—=6407 psf psf